  1. DACS upgrade acceptance test procedure

    SciTech Connect

    Zuehlke, A.C.

    1994-09-28

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H{sub 2} concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations.

  2. Void fraction instrument acceptance test procedure

    SciTech Connect

    Pearce, K.L.

    1994-09-15

    This acceptance test procedure (ATP) was written to test the void fraction instrument (VFI) and verify that the unit is ready for field service. The procedure verifies that the mechanical and electrical features (not specifically addressed in the software ATP) and software alarms are operating as designed.

  3. W-087 Acceptance test procedure. Revision 1

    SciTech Connect

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  4. Operator coil monitoring Acceptance Test Procedure

    SciTech Connect

    Erhart, M.F.

    1995-05-16

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  5. Operator coil monitoring acceptance test procedure

    SciTech Connect

    Erhart, M.F.

    1995-06-05

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  6. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    SciTech Connect

    JOHNSTON, D.C.

    2000-08-23

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  7. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    SciTech Connect

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  8. Acceptance test procedure for SY Tank Farm replacement exhauster unit

    SciTech Connect

    Becken, G.W.

    1994-12-16

    The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

  9. Acceptance test procedure for Project W-049H

    SciTech Connect

    Buckles, D.I.

    1994-09-29

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field.

  10. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    SciTech Connect

    JOHNS, B.R.

    1999-10-28

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  11. Acceptance test procedure for the 105-KW isolation barrier leak rate

    SciTech Connect

    McCracken, K.J.

    1995-05-19

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices.

  12. Procedures for acceptance testing of solar energy systems

    NASA Astrophysics Data System (ADS)

    Johnson, D. L.; Joncich, D. M.

    1984-04-01

    This report describes research on the use of simple, low-cost meters for measuring the performance of solar energy systems in Army buildings and for comparing the measured performance with the design specification requirements. The requirements of meters for measuring the performance of solar energy systems were defined. A BTU-Meter for measuring heat transfer was designed, and commercial meters for taking other measurements were obtained. The meters were installed in a solar system in the laboratory and a pilot test of the acceptance test was done. Suggested draft revisions to Corps of Engineers design documents were prepared; designers could use these revisions to include acceptance testing provisions in solar energy system design. It was found that in a short-duration test, simple, low-cost meters can be used to determine whether a newly installed solar energy system is operating as specified. The simplicity of the metering approach allows designers to routinely include metering in the solar system design. The contractor can easily install the meters with the other solar components. Since the meters are so versatile, they can be used continuously for long-term performance monitoring. This gives the designer performance data and allows maintenance personnel to detect and diagnose solar equipment malfunctions. Thus, solar energy system metering can provide a unified, low-cost approach for meeting the wide range of measurement needs of Army solar energy systems.

  13. Acceptance Test Procedure: SY101 air pallet system

    SciTech Connect

    Koons, B.M.

    1995-05-30

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose.

  14. PDSS/IMC qualification test software acceptance procedures

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Tests to be performed for qualifying the payload development support system image motion compensator (IMC) are identified. The performance of these tests will verify the IMC interfaces and thereby verify the qualification test software.

  15. Tank Monitoring and Control Sys (TMACS) Acceptance Test Procedure

    SciTech Connect

    WANDLING, R.R.

    1999-11-08

    The purpose of this document is to describe tests performed to validate Revision 11.2 of the TMACS Monitor and Control System (TMCACS) and verify that the software functions as intended by design. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  16. MAC mini acceptance test procedure, software Version 3.0

    SciTech Connect

    Russell, V.K.

    1994-10-17

    The K Basins Materials Accounting (MAC) programs had some major improvements made to it to organize the main-tables by Location, Canister, and Material. This ATP describes how the code was to be tested to verify its correctness.

  17. MAC mini acceptance test procedures, software Version 3.3

    SciTech Connect

    Russell, V.K.

    1994-10-17

    The K Basins Materials Accounting (MAC) programs had some improvements made to it to to change slightly the access authorized users had to the modification of critical data. This ATP describes how the code was to be tested to verify its correctness.

  18. MBA acceptance test procedures, software Version 1.4

    SciTech Connect

    Mullaney, J.E.; Russell, V.K.

    1994-10-17

    The Mass Balance Program (MBA) is an adjunct to the Materials Accounting database system, Version 3.4. MBA was written to equip the personnel performing K-Basin encapsulation tasks with a conservative estimate of accumulated sludge during the processing of canisters into and out of the chute. The K Basins Materials Balance programs had some minor improvements made to it to feedback the chute processing status to the operator better. This ATP describes how the code was to be tested to verify its correctness.

  19. Project B610 process control configuration acceptance test procedure

    SciTech Connect

    Silvan, G.R.

    1994-09-20

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator`s console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A.

  20. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  1. Acceptance test procedure, 241-SY-101/241-C-106 shot loading system

    SciTech Connect

    Ostrom, M.J.

    1994-11-01

    This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations.

  2. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    SciTech Connect

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  3. SU-E-T-269: Differential Hazard Analysis For Conventional And New Linac Acceptance Testing Procedures

    SciTech Connect

    Harry, T; Yaddanapudi, S; Mutic, S; Cai, B; Goddu, S; Noel, C; Pawlicki, T

    2015-06-15

    Purpose: New techniques and materials have recently been developed to expedite the conventional Linac Acceptance Testing Procedure (ATP). The new ATP method uses the Electronic Portal Imaging Device (EPID) for data collection and is presented separately. This new procedure is meant to be more efficient then conventional methods. While not clinically implemented yet, a prospective risk assessment is warranted for any new techniques. The purpose of this work is to investigate the risks and establish the pros and cons between the conventional approach and the new ATP method. Methods: ATP tests that were modified and performed with the EPID were analyzed. Five domain experts (Medical Physicists) comprised the core analysis team. Ranking scales were adopted from previous publications related to TG 100. The number of failure pathways for each ATP test procedure were compared as well as the number of risk priority numbers (RPN’s) greater than 100 were compared. Results: There were fewer failure pathways with the new ATP compared to the conventional, 262 and 556, respectively. There were fewer RPN’s > 100 in the new ATP compared to the conventional, 41 and 115. Failure pathways and RPN’s > 100 for individual ATP tests on average were 2 and 3.5 times higher in the conventional ATP compared to the new, respectively. The pixel sensitivity map of the EPID was identified as a key hazard to the new ATP procedure with an RPN of 288 for verifying beam parameters. Conclusion: The significant decrease in failure pathways and RPN’s >100 for the new ATP mitigates the possibilities of a catastrophic error occurring. The Pixel Sensitivity Map determining the response and inherent characteristics of the EPID is crucial as all data and hence results are dependent on that process. Grant from Varian Medical Systems Inc.

  4. Acceptance Test Procedure for AMS-4 Continuous Air Monitors (CAM) at 241-AN Exhausters

    SciTech Connect

    FREEMAN, R.D.

    1999-09-22

    This supporting document provides detailed instruction for ensuring the existing alarms and interlocks are in an acceptable condition prior to performing the functional test of the AMS-4 installation.

  5. 241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  6. SN-268 encasement leak detection ANA-WT-LDSTA-335 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for encasement leak detector system installed in 241-AN-A Encasement Line SN-268, located at 200E Tank Farms. This procedure provides instructions for demonstrating that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  7. 241-AN-A pit leak detection ANA-WT-LDSTA-331 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  8. Cone penetrometer acceptance test report

    SciTech Connect

    Boechler, G.N.

    1996-09-19

    This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP section that satisfied the specification.

  9. 241-AN-B valve pit manifold valves and position indication acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-B Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.

  10. 241-AN-A valve pit manifold valves and position indication acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-A Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.

  11. LIMS user acceptance testing.

    PubMed

    Klein, Corbett S

    2003-01-01

    Laboratory Information Management Systems (LIMS) play a key role in the pharmaceutical industry. Thorough and accurate validation of such systems is critical and is a regulatory requirement. LIMS user acceptance testing is one aspect of this testing and enables the user to make a decision to accept or reject implementation of the system. This paper discusses key elements in facilitating the development and execution of a LIMS User Acceptance Test Plan (UATP).

  12. Human Factors Process Task Analysis Liquid Oxygen Pump Acceptance Test Procedure for the Advanced Technology Development Center

    NASA Technical Reports Server (NTRS)

    Diorio, Kimberly A.

    2002-01-01

    A process task analysis effort was undertaken by Dynacs Inc. commencing in June 2002 under contract from NASA YA-D6. Funding was provided through NASA's Ames Research Center (ARC), Code M/HQ, and Industrial Engineering and Safety (IES). The John F. Kennedy Space Center (KSC) Engineering Development Contract (EDC) Task Order was 5SMA768. The scope of the effort was to conduct a Human Factors Process Failure Modes and Effects Analysis (HF PFMEA) of a hazardous activity and provide recommendations to eliminate or reduce the effects of errors caused by human factors. The Liquid Oxygen (LOX) Pump Acceptance Test Procedure (ATP) was selected for this analysis. The HF PFMEA table (see appendix A) provides an analysis of six major categories evaluated for this study. These categories include Personnel Certification, Test Procedure Format, Test Procedure Safety Controls, Test Article Data, Instrumentation, and Voice Communication. For each specific requirement listed in appendix A, the following topics were addressed: Requirement, Potential Human Error, Performance-Shaping Factors, Potential Effects of the Error, Barriers and Controls, Risk Priority Numbers, and Recommended Actions. This report summarizes findings and gives recommendations as determined by the data contained in appendix A. It also includes a discussion of technology barriers and challenges to performing task analyses, as well as lessons learned. The HF PFMEA table in appendix A recommends the use of accepted and required safety criteria in order to reduce the risk of human error. The items with the highest risk priority numbers should receive the greatest amount of consideration. Implementation of the recommendations will result in a safer operation for all personnel.

  13. UGV acceptance testing

    NASA Astrophysics Data System (ADS)

    Kramer, Jeffrey A.; Murphy, Robin R.

    2006-05-01

    With over 100 models of unmanned vehicles now available for military and civilian safety, security or rescue applications, it is important to for agencies to establish acceptance testing. However, there appears to be no general guidelines for what constitutes a reasonable acceptance test. This paper describes i) a preliminary method for acceptance testing by a customer of the mechanical and electrical components of an unmanned ground vehicle system, ii) how it has been applied to a man-packable micro-robot, and iii) discusses the value of testing both to ensure that the customer has a workable system and to improve design. The test method automated the operation of the robot to repeatedly exercise all aspects and combinations of components on the robot for 6 hours. The acceptance testing process uncovered many failures consistent with those shown to occur in the field, showing that testing by the user does predict failures. The process also demonstrated that the testing by the manufacturer can provide important design data that can be used to identify, diagnose, and prevent long-term problems. Also, the structured testing environment showed that sensor systems can be used to predict errors and changes in performance, as well as uncovering unmodeled behavior in subsystems.

  14. Acceptance Test Plan.

    DTIC Science & Technology

    2014-09-26

    7 RD-Ai507 154 CCEPTANCE TEST PLN(U) WESTINGHOUSE DEFENSE ND i/i ELECTRO ICS CENTER BALTIMORE MD DEVELOPMENT AND OPERATIONS DIY D C KRRiJS 28 JUN...Ln ACCEPTANCE TEST PLAN FOR SPECIAL RELIABILITY TESTS FOR BROADBAND MICROWAVE AMPLIFIER PANEL David C. Kraus, Reliability Engineer WESTINGHOUSE ...ORGANIZATION b. OFFICE SYMBOL 7g& NAME OF MONITORING ORGANIZATION tIf appdeg ble) WESTINGHOUSE ELECTRIC CORP. - NAVAL RESEARCH LABORATORY e. AOORES$ (Ci7t

  15. Human Factors Process Task Analysis: Liquid Oxygen Pump Acceptance Test Procedure at the Advanced Technology Development Center

    NASA Technical Reports Server (NTRS)

    Diorio, Kimberly A.; Voska, Ned (Technical Monitor)

    2002-01-01

    This viewgraph presentation provides information on Human Factors Process Failure Modes and Effects Analysis (HF PFMEA). HF PFMEA includes the following 10 steps: Describe mission; Define System; Identify human-machine; List human actions; Identify potential errors; Identify factors that effect error; Determine likelihood of error; Determine potential effects of errors; Evaluate risk; Generate solutions (manage error). The presentation also describes how this analysis was applied to a liquid oxygen pump acceptance test.

  16. Environmental Test Screening Procedure

    NASA Technical Reports Server (NTRS)

    Zeidler, Janet

    2000-01-01

    This procedure describes the methods to be used for environmental stress screening (ESS) of the Lightning Mapper Sensor (LMS) lens assembly. Unless otherwise specified, the procedures shall be completed in the order listed, prior to performance of the Acceptance Test Procedure (ATP). The first unit, S/N 001, will be subjected to the Qualification Vibration Levels, while the remainder will be tested at the Operational Level. Prior to ESS, all units will undergo Pre-ESS Functional Testing that includes measuring the on-axis and plus or minus 0.95 full field Modulation Transfer Function and Back Focal Length. Next, all units will undergo ESS testing, and then Acceptance testing per PR 460.

  17. PACS component testing: beta and acceptance testing

    NASA Astrophysics Data System (ADS)

    Honeyman-Buck, Janice C.; Frost, Meryll M.; Staab, Edward V.

    1997-05-01

    The functionality and performance expectations of all PACS components must be specified at the time of purchase and tested completely upon delivery to assure customer satisfaction and successful adoption of the new technology. This process may be more elaborate if the customer agrees to serve as a Beta test site for a new component or a new revision of an existing component.A carefully designed test plan will save time at installation, will allow the customer and vendor to agree on expectations, and will assure that the installation will proceed as planned. This paper describes the test procedure used at the University of Florida to accept each PACS component, either a commercial product, or one developed in house. A set of documents contain descriptions of the pre-installation environment, sets of studies to be used in the test, installation checklist, functional usage reports, subjective evaluations, and problem reporting forms. Training and user documentation is also reviewed and 'help lists' are created to help users perform the most common functions. Although details in the documents are changed to match the type of component being tested, the general form of the test remains the same. A formal procedure for testing the functionality and performance of new equipment can save time for both the vendor and the customer and, if specified at the time of purchase, can serve to document the expectations of the customer. Following these procedures will assure a successful installation and improve customer satisfaction.

  18. Acceptance/operational test procedure 101-AW tank camera purge system and 101-AW video camera system

    SciTech Connect

    Castleberry, J.L.

    1994-09-19

    This procedure will document the satisfactory operation of the 101-AW Tank Camera Purge System (CPS) and the 101-AW Video Camera System. The safety interlock which shuts down all the electronics inside the 101-AW vapor space, during loss of purge pressure, will be in place and tested to ensure reliable performance. This procedure is separated into four sections. Section 6.1 is performed in the 306 building prior to delivery to the 200 East Tank Farms and involves leak checking all fittings on the 101-AW Purge Panel for leakage using a Snoop solution and resolving the leakage. Section 7.1 verifies that PR-1, the regulator which maintains a positive pressure within the volume (cameras and pneumatic lines), is properly set. In addition the green light (PRESSURIZED) (located on the Purge Control Panel) is verified to turn on above 10 in. w.g. and after the time delay (TDR) has timed out. Section 7.2 verifies that the purge cycle functions properly, the red light (PURGE ON) comes on, and that the correct flowrate is obtained to meet the requirements of the National Fire Protection Association. Section 7.3 verifies that the pan and tilt, camera, associated controls and components operate correctly. This section also verifies that the safety interlock system operates correctly during loss of purge pressure. During the loss of purge operation the illumination of the amber light (PURGE FAILED) will be verified.

  19. L-286 Acceptance Test Record

    SciTech Connect

    HARMON, B.C.

    2000-01-14

    This document provides a detailed account of how the acceptance testing was conducted for Project L-286, ''200E Area Sanitary Water Plant Effluent Stream Reduction''. The testing of the L-286 instrumentation system was conducted under the direct supervision

  20. Nitrogen trailer acceptance test report

    SciTech Connect

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0249. The equipment was tested according to WHC-SD-WM-ATP-108 Rev.0. The equipment being tested is a portable contained nitrogen supply. The test was conducted at Norco`s facility.

  1. Acceptance test report 2721-Z upgrades

    SciTech Connect

    Keck, R.D.

    1998-02-03

    This test procedure provides instructions for acceptance testing of modifications to the 2721-Z diesel-generator system made by Project C-189. The modifications include (1) replacing the generator NUMA-LOGIC controller with connection to the PFP distributed control system (DCS), (2) replacing ATSI with a breaker switching scheme for 2736-ZB backup power and (3) providing a method for generator load and system testing.

  2. From requirements to acceptance tests

    NASA Technical Reports Server (NTRS)

    Baize, Lionel; Pasquier, Helene

    1993-01-01

    From user requirements definition to accepted software system, the software project management wants to be sure that the system will meet the requirements. For the development of a telecommunication satellites Control Centre, C.N.E.S. has used new rules to make the use of tracing matrix easier. From Requirements to Acceptance Tests, each item of a document must have an identifier. A unique matrix traces the system and allows the tracking of the consequences of a change in the requirements. A tool has been developed, to import documents into a relational data base. Each record of the data base corresponds to an item of a document, the access key is the item identifier. Tracing matrix is also processed, providing automatically links between the different documents. It enables the reading on the same screen of traced items. For example one can read simultaneously the User Requirements items, the corresponding Software Requirements items and the Acceptance Tests.

  3. 46 CFR 164.015-5 - Procedure for acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Plastic Foam, Unicellular, Buoyant, Sheet and Molded Shape § 164.015-5 Procedure for acceptance. (a) Unicellular plastic foam is not subject to formal approval, but will be... manufacturing methods and to select from foam already manufactured sufficient sample material for testing...

  4. TMACS Test Procedure TP007: System administration

    SciTech Connect

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-05-24

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions.

  5. TMACS Test Procedure TP002: Trending

    SciTech Connect

    Scanlan, P.K.

    1994-08-29

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  6. Acceptance test report for the safety class shutdown system

    SciTech Connect

    Zuroff, W.F.

    1996-10-17

    This document provides the Acceptance Test Report for the successful testing of the Safety Shutdown Circuit. The test was done in accordance with the requirements that were defined in WHC-SD-WM-SCH-003, Interim Stabilization Safety Class Trip Circuit CGI Dedication Criteria. The actual test procedure document was contained in WHC-SD-WM-ATP-185, Acceptance Test Procedure for the Safety Class Shutdown System.

  7. Emperical Tests of Acceptance Sampling Plans

    NASA Technical Reports Server (NTRS)

    White, K. Preston, Jr.; Johnson, Kenneth L.

    2012-01-01

    Acceptance sampling is a quality control procedure applied as an alternative to 100% inspection. A random sample of items is drawn from a lot to determine the fraction of items which have a required quality characteristic. Both the number of items to be inspected and the criterion for determining conformance of the lot to the requirement are given by an appropriate sampling plan with specified risks of Type I and Type II sampling errors. In this paper, we present the results of empirical tests of the accuracy of selected sampling plans reported in the literature. These plans are for measureable quality characteristics which are known have either binomial, exponential, normal, gamma, Weibull, inverse Gaussian, or Poisson distributions. In the main, results support the accepted wisdom that variables acceptance plans are superior to attributes (binomial) acceptance plans, in the sense that these provide comparable protection against risks at reduced sampling cost. For the Gaussian and Weibull plans, however, there are ranges of the shape parameters for which the required sample sizes are in fact larger than the corresponding attributes plans, dramatically so for instances of large skew. Tests further confirm that the published inverse-Gaussian (IG) plan is flawed, as reported by White and Johnson (2011).

  8. 46 CFR 164.120-9 - Procedure for acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Fire Retardant Resins for Lifeboats and Rescue Boats § 164.120-9 Procedure for acceptance. (a) Fire retardant resin is not subject to formal approval, but will be accepted by... Guard acceptance of fire retardant resin for use in the manufacture of lifesaving equipment does...

  9. Editorial: acceptance criteria and editorial procedures for Optics Letters.

    PubMed

    Zhang, Xi-Cheng; Andersen, Peter E; Justus, Brian L; Galtarossa, Andrea

    2014-09-01

    Optics Letters Editors strive to provide timely reviews and decisions for authors while bringing top quality papers to the optics community. The purpose of this editorial is to explain Optics Letters' acceptance criteria and editorial procedures. Our hope is that greater transparency concerning the decision-making process will increase understanding as well as acceptance of our criteria and procedures.

  10. 14 CFR 151.29 - Procedures: Offer, amendment, and acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... § 151.29 Procedures: Offer, amendment, and acceptance. (a) Upon approving a project, the Administrator... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Procedures: Offer, amendment, and acceptance. 151.29 Section 151.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT...

  11. 105-KE Isolation Barrier Leak Rate Acceptance Test Report

    SciTech Connect

    McCracken, K.J.

    1995-06-14

    This Acceptance Test Report (ATR) contains the completed and signed Acceptance Procedure (ATP) for the 105-KE Isolations Barrier Leak Rate Test. The Test Engineer`s log, the completed sections of the ATP in the Appendix for Repeat Testing (Appendix K), the approved WHC J-7s (Appendix H), the data logger files (Appendices T and U), and the post test calibration checks (Appendix V) are included.

  12. 46 CFR 164.019-7 - Non-standard components; acceptance criteria and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... identification number. (3) The report of a recognized laboratory's test data in accordance with the “acceptance... 46 Shipping 6 2011-10-01 2011-10-01 false Non-standard components; acceptance criteria and... Components § 164.019-7 Non-standard components; acceptance criteria and procedures. (a) General....

  13. Toddler test or procedure preparation

    MedlinePlus

    Preparing toddler for test/procedure; Test/procedure preparation - toddler; Preparing for a medical test or procedure - toddler ... Before the test, know that your child will probably cry. Even if you prepare, your child may feel some discomfort or ...

  14. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    SciTech Connect

    NNSA /NSO Waste Management Project

    2008-06-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

  15. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect

    U.S. Department of Energy, Nevada Operations Office, Waste Acceptance Criteria

    1999-05-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the Nevada Test Site.

  16. Preschooler test or procedure preparation

    MedlinePlus

    Preparing preschoolers for test/procedure; Test/procedure preparation - preschooler ... Preparing children for medical tests can reduce their anxiety. It can also make them less likely to cry and resist the procedure. Research shows that ...

  17. Acceptance Test Plan for ANSYS Software

    SciTech Connect

    CREA, B.A.

    2000-10-25

    This plan governs the acceptance testing of the ANSYS software (Full Mechanical Release 5.5) for use on Project Word Management Contract (PHMC) computer systems (either UNIX or Microsoft Windows/NT). There are two phases to the acceptance testing covered by this test plan: program execution in accordance with the guidance provided in installation manuals; and ensuring results of the execution are consistent with the expected physical behavior of the system being modeled.

  18. DACS upgrade acceptance test report

    SciTech Connect

    Zuehlke, A.C.

    1994-12-21

    The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tank. These sensors provide information such as: (1) tank vapor space and ventilation system H{sub 2} concentration; (2) tank waste temperature; (3) tank pressure; (4) waste density; (5) operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; (6) strain (for major equipment); and (7) waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations. The report documents testing performed per WHC-SD-WM-ATP-082. Rev. 0-13.

  19. Light duty utility arm phase 2 qualification test procedure

    SciTech Connect

    Barnes, G.A.

    1997-01-16

    This Acceptance Test Procedure (ATP) will test and verify that the Exhauster meets the specified functional requirements, safety requirements, operating requirements, and provide a record of the functional test results. The system/functions that will be tested are listed in the scope section of the Acceptance Test Procedure.

  20. Gas characterization system software acceptance test report

    SciTech Connect

    Vo, C.V.

    1996-03-28

    This document details the results of software acceptance testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  1. 46 CFR 164.015-5 - Procedure for acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Plastic Foam, Unicellular, Buoyant, Sheet and Molded Shape § 164.015-5 Procedure for acceptance. (a) Unicellular plastic foam is not subject to formal approval, but will be... unicellular plastic foam prior to being incorporated into finished products, or during the course...

  2. 46 CFR 164.015-5 - Procedure for acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Plastic Foam, Unicellular, Buoyant, Sheet and Molded Shape § 164.015-5 Procedure for acceptance. (a) Unicellular plastic foam is not subject to formal approval, but will be... unicellular plastic foam prior to being incorporated into finished products, or during the course...

  3. 46 CFR 164.015-5 - Procedure for acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Plastic Foam, Unicellular, Buoyant, Sheet and Molded Shape § 164.015-5 Procedure for acceptance. (a) Unicellular plastic foam is not subject to formal approval, but will be... unicellular plastic foam prior to being incorporated into finished products, or during the course...

  4. 46 CFR 164.015-5 - Procedure for acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Plastic Foam, Unicellular, Buoyant, Sheet and Molded Shape § 164.015-5 Procedure for acceptance. (a) Unicellular plastic foam is not subject to formal approval, but will be... unicellular plastic foam prior to being incorporated into finished products, or during the course...

  5. WRAP low level waste (LLW) glovebox acceptance test report

    SciTech Connect

    Leist, K.J.

    1998-02-17

    In June 28, 1997, the Low Level Waste (LLW) glovebox was tested using glovebox acceptance test procedure 13031A-85. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, lidder/delidder device and the supercompactor were also conducted. As of November 24, 1997, 2 of the 131 test exceptions that affect the LLW glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test Exceptions are provided as appendices to this report.

  6. Induction graphitizing furnace acceptance test report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The induction furnace was designed to provide the controlled temperature and environment required for the post-cure, carbonization and graphitization processes for the fabrication of a fibrous graphite NERVA nozzle extension. The acceptance testing required six tests and a total operating time of 298 hrs. Low temperature mode operations, 120 to 850 C, were completed in one test run. High temperature mode operations, 120 to 2750 C, were completed during five tests.

  7. Test Methods for Acceptance Testing of Telescopes

    DTIC Science & Technology

    1993-07-01

    instrument. Although various interferometer configurations are used, they all basically operate on the same principle. The beam from a stable continuous...a Goerz with a nominal focal length of 92 inches. This lens has been recoated and carefully aligned to produce excellent image quality. The focus...test. Such requirements are necessary when the procuring agency has no facilities for performing adequate tests. It is also an excellent policy even

  8. User Acceptance of YouTube for Procedural Learning: An Extension of the Technology Acceptance Model

    ERIC Educational Resources Information Center

    Lee, Doo Young; Lehto, Mark R.

    2013-01-01

    The present study was framed using the Technology Acceptance Model (TAM) to identify determinants affecting behavioral intention to use YouTube. Most importantly, this research emphasizes the motives for using YouTube, which is notable given its extrinsic task goal of being used for procedural learning tasks. Our conceptual framework included two…

  9. 24 CFR 3280.402 - Test procedure for roof trusses.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Test procedure for roof trusses... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS Testing § 3280.402 Test procedure for roof trusses. (a) Roof load tests. The following is an acceptable test procedure,...

  10. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    SciTech Connect

    THOMAS, W.K.

    2000-01-10

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field.

  11. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect

    U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-10-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  12. W-026, acceptance test report manipulator system

    SciTech Connect

    Watson, T.L.

    1997-04-15

    The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests.

  13. Acceptability of Flight Deck-Based Interval Management Crew Procedures

    NASA Technical Reports Server (NTRS)

    Murdock, Jennifer L.; Wilson, Sara R.; Hubbs, Clay E.; Smail, James W.

    2013-01-01

    The Interval Management for Near-term Operations Validation of Acceptability (IM-NOVA) experiment was conducted at the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) in support of the NASA Next Generation Air Transportation System (NextGen) Airspace Systems Program's Air Traffic Management Technology Demonstration - 1 (ATD-1). ATD-1 is intended to showcase an integrated set of technologies that provide an efficient arrival solution for managing aircraft using NextGen surveillance, navigation, procedures, and automation for both airborne and ground-based systems. The goal of the IM-NOVA experiment was to assess if procedures outlined by the ATD-1 Concept of Operations, when used with a minimum set of Flight deck-based Interval Management (FIM) equipment and a prototype crew interface, were acceptable to and feasible for use by flight crews in a voice communications environment. To investigate an integrated arrival solution using ground-based air traffic control tools and aircraft automatic dependent surveillance broadcast (ADS-B) tools, the LaRC FIM system and the Traffic Management Advisor with Terminal Metering and Controller Managed Spacing tools developed at the NASA Ames Research Center (ARC) were integrated in LaRC's Air Traffic Operations Laboratory. Data were collected from 10 crews of current, qualified 757/767 pilots asked to fly a high-fidelity, fixed based simulator during scenarios conducted within an airspace environment modeled on the Dallas-Fort Worth (DFW) Terminal Radar Approach Control area. The aircraft simulator was equipped with the Airborne Spacing for Terminal Area Routes algorithm and a FIM crew interface consisting of electronic flight bags and ADS-B guidance displays. Researchers used "pseudo-pilot" stations to control 24 simulated aircraft that provided multiple air traffic flows into DFW, and recently retired DFW air traffic controllers served as confederate Center, Feeder, Final, and Tower

  14. Acceptance test report: Field test of mixer pump for 241-AN-107 caustic addition project

    SciTech Connect

    Leshikar, G.A.

    1997-05-16

    The field acceptance test of a 75 HP mixer pump (Hazleton serial number N-20801) installed in Tank 241-AN-107 was conducted from October 1995 thru February 1996. The objectives defined in the acceptance test were successfully met, with two exceptions recorded. The acceptance test encompassed field verification of mixer pump turntable rotation set-up and operation, verification that the pump instrumentation functions within established limits, facilitation of baseline data collection from the mixer pump mounted ultrasonic instrumentation, verification of mixer pump water flush system operation and validation of a procedure for its operation, and several brief test runs (bump) of the mixer pump.

  15. Site acceptance test, W-030 MICON system

    SciTech Connect

    Hill, L.F., Westinghouse Hanford

    1996-06-10

    Monitoring and control of the W-030 ventilation upgrade is provided by a distributed control system (DCS) furnished by MICON Corporation. After shipment to the Hanford Site, the site acceptance test (SAT) for this system was conducted in a laboratory environment over a six month period, involving four distinct phases and numerous hardware and software modifications required to correct test exceptions. The final results is a system which is not fully compliant with procurement specifications but is determined to meet minimum Project W-030 safety and functional requirements. A negotiated settlement was reached with the supplier to establish a `path forward` for system implementation. This report documents the `as-run` status of the SAT. The SAT was completed in August of 1995. It was later followed by comprehensive acceptance testing of the W-030 control-logic configuration software; results are documented in WHC-SD-W030-ATR-011. Further testing is reported as part of process system startup operational testing, performed after the MICON installation.

  16. Payload test philosophy. [JPL views on qualification/acceptance testing

    NASA Technical Reports Server (NTRS)

    Gindorf, T.

    1979-01-01

    The general philosophy of how JPL views payload qualification/acceptance testing for programs that are done either in-house or by contractors is described. Particular attention is given to mission risk classifications, preliminary critical design reviews, environmental design requirements, the thermal and dynamics development tests, and the flight spacecraft system test.

  17. 242A Distributed Control System Year 2000 Acceptance Test Report

    SciTech Connect

    TEATS, M.C.

    1999-08-31

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.

  18. How to pass a sensor acceptance test: using the gap between acceptance criteria and operational performance

    NASA Astrophysics Data System (ADS)

    Bijl, Piet

    2016-10-01

    When acquiring a new imaging system and operational task performance is a critical factor for success, it is necessary to specify minimum acceptance requirements that need to be met using a sensor performance model and/or performance tests. Currently, there exist a variety of models and test from different origin (defense, security, road safety, optometry) and they all do different predictions. This study reviews a number of frequently used methods and shows the effects that small changes in procedure or threshold criteria can have on the outcome of a test. For example, a system may meet the acceptance requirements but not satisfy the needs for the operational task, or the choice of test may determine the rank order of candidate sensors. The goal of the paper is to make people aware of the pitfalls associated with the acquisition process, by i) illustrating potential tricks to have a system accepted that is actually not suited for the operational task, and ii) providing tips to avoid this unwanted situation.

  19. Acceptance Test Report for 241-U compressed air system

    SciTech Connect

    Freeman, R.D.

    1994-10-20

    This Acceptance Test Report (ATR) documents the results of acceptance testing of a newly upgraded compressed air system at 241-U Farm. The system was installed and the test successfully performed under work package 2W-92-01027.

  20. 14 CFR Appendix F to Part 23 - Test Procedure

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the actual cross section of the material or part installed in the airplane. When performing the test... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Pt. 23, App. F Appendix F to Part 23—Test Procedure Acceptable test procedure for self-extinguishing materials for showing compliance...

  1. Light duty utility arm equipment qualification test procedure

    SciTech Connect

    Kiebel, G.R., Westinghouse Hanford

    1996-07-22

    The Equipment Qualification Test described in this test procedure document is the acceptance test procedure (ATP) for the LDUA Baseline System. It verifies that the equipment is complete and in working order, and demonstrates its readiness for being deployed into an actual underground storage tank.

  2. 14 CFR 151.123 - Procedures: Offer; amendment; acceptance; advance planning agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Procedures: Offer; amendment; acceptance... Planning and Engineering Proposals § 151.123 Procedures: Offer; amendment; acceptance; advance planning.... FAA's offer and the sponsor's acceptance constitute an advance planning grant agreement between...

  3. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Test procedures. 1033.315 Section 1033... Programs § 1033.315 Test procedures. (a) Test procedures. Use the test procedures described in subpart F of this part, except as specified in this section. (1) You may ask to use other test procedures. We...

  4. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Test procedures. 1033.315 Section 1033... Programs § 1033.315 Test procedures. (a) Test procedures. Use the test procedures described in subpart F of this part, except as specified in this section. (1) You may ask to use other test procedures. We...

  5. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Test procedures. 1033.315 Section 1033... Programs § 1033.315 Test procedures. (a) Test procedures. Use the test procedures described in subpart F of this part, except as specified in this section. (1) You may ask to use other test procedures. We...

  6. 32 CFR 1806.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Procedures governing acceptance of service of process. 1806.3 Section 1806.3 National Defense Other Regulations Relating to National Defense NATIONAL COUNTERINTELLIGENCE CENTER PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1806.3 Procedures...

  7. 32 CFR 1806.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Procedures governing acceptance of service of process. 1806.3 Section 1806.3 National Defense Other Regulations Relating to National Defense NATIONAL COUNTERINTELLIGENCE CENTER PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1806.3 Procedures...

  8. 32 CFR 1806.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Procedures governing acceptance of service of process. 1806.3 Section 1806.3 National Defense Other Regulations Relating to National Defense NATIONAL COUNTERINTELLIGENCE CENTER PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1806.3 Procedures...

  9. 32 CFR 1806.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Procedures governing acceptance of service of process. 1806.3 Section 1806.3 National Defense Other Regulations Relating to National Defense NATIONAL COUNTERINTELLIGENCE CENTER PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1806.3 Procedures...

  10. The Murmansk Initiative - RF: Acceptance Testing

    SciTech Connect

    Czajkowski, C.; Wester, D. W.; Dyer, R. S.; Soerlie, A. A.; Moller, B.; Barnes, E.

    2002-02-26

    The Murmansk Initiative-RF (MI) was conceived to provide the Russian Federation (RF) with the capacity to manage low-level liquid radioactive waste (LLRW) and comply with the requirements of the London Convention that prohibit ocean dumping. The trilateral project among Norway, the RF, and the United States of America (U.S.) began in 1994 and was the first to utilize exclusively Russian subcontractors to upgrade and expand an existing LLRW treatment plant on the premises of RTP Atomflot in Murmansk, Russia. The project moved quickly through the design phase. Progress during the construction phase was somewhat slower because of difficulties with acquisition of hardware, inexperience with automated instrumentation and control equipment, and unexpected design changes in the cementation unit. The project advanced into the test-operation phase, which is currently underway, in June 2001. Initial runs with liquid waste have revealed that procedures for unloading spent ion-exchange sorbents could be improved and that sludges formed during removal of alkaline-earth metals should be compacted in order for the facility to operate at its full potential. Resolution of these issues is expected within the next few months.

  11. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a) Performance testing. Manufacturers shall ensure that the performance tests described in § 164.023-7 (a) or...

  12. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a) Performance testing. Manufacturers shall ensure that the performance tests described in § 164.023-7 (a) or...

  13. Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Empirical Testing. Volume 2

    NASA Technical Reports Server (NTRS)

    Johnson, Kenneth L.; White, K. Preston, Jr.

    2012-01-01

    The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. In this paper, the results of empirical tests intended to assess the accuracy of acceptance sampling plan calculators implemented for six variable distributions are presented.

  14. 46 CFR 164.120-9 - Procedure for acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Fire Retardant Resins for Lifeboats and Rescue Boats § 164.120-9 Procedure... for use, and quality control procedures in accordance with 46 CFR 159.005-9. (c)...

  15. 46 CFR 164.120-9 - Procedure for acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Fire Retardant Resins for Lifeboats and Rescue Boats § 164.120-9 Procedure... for use, and quality control procedures in accordance with 46 CFR 159.005-9. (c)...

  16. 40 CFR 90.508 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 90.508 Section 90.508....508 Test procedures. (a) For nonroad engines subject to the provisions of this subpart, the prescribed test procedures are the appropriate small SI engine test procedures as described in subpart E of...

  17. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT... EQUIPMENT Commercial Clothers Washers Test Procedures § 431.154 Test procedures. The test procedures for residential clothes washers in Appendix J1 to subpart B of part 430 of this title shall be used to...

  18. 40 CFR 89.508 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedures. 89.508 Section 89.508... Test procedures. (a)(1) For nonroad engines subject to the provisions of this subpart, the prescribed test procedures are the nonroad engine 8-mode test procedure as described in subpart E of this...

  19. 16 CFR 1616.4 - Sampling and acceptance procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...: (A) Prototype Testing and (B) Production Testing. Prior to production, prototypes must be tested to... trim must be subjected to prototype testing. Seams attaching bindings are excluded from testing. (2) Prototype testing. Pre-production prototype testing of each seam and trim specification to be included...

  20. 16 CFR 1616.4 - Sampling and acceptance procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...: (A) Prototype Testing and (B) Production Testing. Prior to production, prototypes must be tested to... trim must be subjected to prototype testing. Seams attaching bindings are excluded from testing. (2) Prototype testing. Pre-production prototype testing of each seam and trim specification to be included...

  1. 16 CFR 1616.4 - Sampling and acceptance procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...: (A) Prototype Testing and (B) Production Testing. Prior to production, prototypes must be tested to... trim must be subjected to prototype testing. Seams attaching bindings are excluded from testing. (2) Prototype testing. Pre-production prototype testing of each seam and trim specification to be included...

  2. 46 CFR 164.019-9 - Procedure for acceptance of revisions of design, process, or materials.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Procedure for acceptance of revisions of design, process... Device Components § 164.019-9 Procedure for acceptance of revisions of design, process, or materials. (a) The manufacturer shall not change the design, material, manufacturing process, or construction of...

  3. Nevada Test Site Waste Acceptance Criteria, December 2000

    SciTech Connect

    2000-12-01

    This document establishes the US Department of Energy, Nevada Operations Office waste acceptance criteria. The waste acceptance criteria provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive waste and mixed waste for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Sites for storage or disposal.

  4. Acceptance test report for W-030 monitor and control system (MCS) software

    SciTech Connect

    Finch, B.G.

    1996-05-06

    This report documents the test performed under `Acceptance Test Procedure WHC-SD-W030-ATP-011, Rev. 0`, for `Project W-030 Tank Farm Ventilation Upgrade`. This report covers testing of the Software Control Logic for the MICON Monitoring and Control System (MCS).

  5. 40 CFR 92.506 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedures. 92.506 Section 92.506... and Audit Programs § 92.506 Test procedures. (a)(1) For locomotives and locomotive engines subject to the provisions of this subpart, the prescribed test procedures are those procedures described...

  6. 16 CFR 1610.6 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1610.6 Section 1610.6... FLAMMABILITY OF CLOTHING TEXTILES The Standard § 1610.6 Test procedure. The test procedure is divided into two... according to paragraph (b)(1) of this section. (a) Step 1—Testing in the original state. (1) Tests shall...

  7. 16 CFR 1610.6 - Test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... FLAMMABILITY OF CLOTHING TEXTILES The Standard § 1610.6 Test procedure. The test procedure is divided into two... (k) and (l). There are some fabrics that require extra attention when preparing test...

  8. 16 CFR 1610.6 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... FLAMMABILITY OF CLOTHING TEXTILES The Standard § 1610.6 Test procedure. The test procedure is divided into two... (k) and (l). There are some fabrics that require extra attention when preparing test...

  9. 16 CFR 1616.4 - Sampling and acceptance procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... trim must be subjected to prototype testing. Seams attaching bindings are excluded from testing. (2) Prototype testing. Pre-production prototype testing of each seam and trim specification to be included in... the flammability requirements of the Standard prior to production. (i) Seams. Make three samples...

  10. Acceptability of the Cytosponge procedure for detecting Barrett's oesophagus: a qualitative study

    PubMed Central

    Freeman, Madeleine; Sasieni, Peter; Smith, Samuel G

    2017-01-01

    Objective To investigate the acceptability of the Cytosponge, a novel sampling device to detect Barrett's oesophagus (BE), a precursor to oesophageal adenocarcinoma (EAC), among people with risk factors for this condition. Design A qualitative study using semistructured interviews and focus group discussions. Data were explored by three researchers using thematic analysis. Setting Community setting in London, UK. Participants A recruitment company identified 33 adults (17 men, 16 women) aged 50–69 years with gastro-oesophageal reflux disease (GERD), a risk factor for BE. The majority of participants were white British (73%). The focus groups were stratified by gender and education. 10 individuals were interviewed and 23 participated in four focus groups. Results 3 key themes emerged from the data: the anticipated physical experience, preferences for the content of information materials and comparisons with the current gold-standard test. Overall acceptability was high, but there was initial concern about the physical experience of taking the test, including swallowing and extracting the Cytosponge. These worries were reduced after handling the device and a video demonstration of the procedure. Knowledge of the relationship between GERD, BE and EAC was poor, and some suggested they would prefer not to know about the link when being offered the Cytosponge. Participants perceived the Cytosponge to be more comfortable, practical and economical than endoscopy. Conclusions These qualitative data suggest the Cytosponge was acceptable to the majority of participants with risk factors for BE, and could be used as a first-line test to investigate GERD symptoms. Concerns about the physical experience of the test were alleviated through multimedia resources. The development of patient information materials is an important next step to ensuring patients are adequately informed and reassured about the procedure. Patient stakeholders should be involved in this process to

  11. 16 CFR 1616.4 - Sampling and acceptance procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... color or print pattern to be included in the unit. (3) Garments with different trim and findings may be... multi-layer fabrics, and binding are excluded from testing except that when trim is used on an edge the trim must be subjected to prototype testing. Seams attaching bindings are excluded from testing....

  12. Automated Product Test Wafer Procedure

    NASA Astrophysics Data System (ADS)

    Brown, Andrew; Minvielle, Anna; Salugsugan, Anita

    1987-04-01

    An automated test wafer procedure has been developed using the KLA 2020 wafer inspector to measure registration and critical dimensions on production wafers. The procedure reduces operator interactions to loading the wafer and entering information for wafer identification. The analysis of the registration data is performed on a PC using the methods established by Perloff to determine both intrafield and grid errors. These results are then used to correct the stepper. CD data is also analyzed by the program and corrections to the exposure time are calculated. It was found that the KLA 2020 is as much as 10 times faster and 4 times more precise in obtaining registration data then an operator reading optical verniers on a microscope. Due to the high precision of the reading, the analysis does not need a large number of readings to obtain precise and accurate stepper corrections. Further, significant improvements can be obtained by adding registration targets to measure the intrafield errors. Using the KLA 2020 and computer analysis we have demonstrated an ability to reduce the errors for a manually aligned run to a one sigma distribution of 0.09 um for x and y translation, 0.4 PPM for scaling and orthogonality, and 2.3 PPM for rotation from the first test wafer for a GCA 6100. Nearly all of this variation is due to operator misalignment or the inability of the stepper to correct the errors. The corrections with this technique measuring the same wafer are precise to + 0.01 um in translation and + 0.5 PPM for rotation, scaling, and orthogonality. It has also been shown that a simple linear equation can be used to correct exposure time, even when a process is not tightly controlled.

  13. Efficacy, safety, and patient acceptability of the Essure™ procedure

    PubMed Central

    Lessard, Collette R; Hopkins, Matthew R

    2011-01-01

    The Essure™ system for permanent contraception was developed as a less invasive method of female sterilization. Placement of the Essure™ coil involves a hysteroscopic transcervical technique. This procedure can be done in a variety of settings and with a range of anesthetic options. More than eight years have passed since the US Food and Drug Administration approval of Essure™. Much research has been done to evaluate placement success, adverse outcomes, satisfaction, pain, and the contraceptive efficacy of the Essure™. The purpose of this review is to summarize the available literature regarding the efficacy, safety, and patient satisfaction with this new sterilization technique. PMID:21573052

  14. WRAP low level waste restricted waste management (LLW RWM) glovebox acceptance test report

    SciTech Connect

    Leist, K.J.

    1997-11-24

    On April 22, 1997, the Low Level Waste Restricted Waste Management (LLW RWM) glovebox was tested using acceptance test procedure 13027A-87. Mr. Robert L. Warmenhoven served as test director, Mr. Kendrick Leist acted as test operator and test witness, and Michael Lane provided miscellaneous software support. The primary focus of the glovebox acceptance test was to examine glovebox control system interlocks, operator Interface Unit (OIU) menus, alarms, and messages. Basic drum port and lift table control sequences were demonstrated. OIU menus, messages, and alarm sequences were examined, with few exceptions noted. Barcode testing was bypassed, due to the lack of installed equipment as well as the switch from basic reliance on fixed bar code readers to the enhanced use of portable bar code readers. Bar code testing was completed during performance of the LLW RWM OTP. Mechanical and control deficiencies were documented as Test Exceptions during performance of this Acceptance Test. These items are attached as Appendix A to this report.

  15. GMS/DACS interface acceptance test report

    SciTech Connect

    Zuehlke, A.C.

    1994-10-10

    The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tank. These sensors provide information such as: tank vapor space and ventilation system H{sub 2} concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations. The portions of the system to be tested include: new RGA5 gas monitor; existing gas chromatographs; FTIR; B and K (Photo) NH{sub 3} equipment; any new or changed Genesis screens; and I/O Drop 13.

  16. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedures. 90.707 Section 90.707... Program § 90.707 Test procedures. (a)(1) For small SI engines subject to the provisions of this subpart, the prescribed test procedures are specified in subpart E of this part. (2) The Administrator may,...

  17. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Test procedures. 581.7 Section 581.7... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) BUMPER STANDARD § 581.7 Test procedures. (a) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times...

  18. 40 CFR 205.54 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Test procedures. 205.54 Section 205.54... EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of vehicles...

  19. 40 CFR 205.54 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Test procedures. 205.54 Section 205.54... EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of vehicles...

  20. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Test procedures. 581.7 Section 581.7... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) BUMPER STANDARD § 581.7 Test procedures. (a) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times...

  1. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Test procedures. 581.7 Section 581.7... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) BUMPER STANDARD § 581.7 Test procedures. (a) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times...

  2. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 90.707 Section 90.707... Program § 90.707 Test procedures. (a)(1) For small SI engines subject to the provisions of this subpart, the prescribed test procedures are specified in subpart E of this part. (2) The Administrator may,...

  3. Example Procedures for Developing Acceptance-Range Criteria for BESTEST-EX

    SciTech Connect

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    This document provides an example procedure for establishing acceptance-range criteria to assess results from software undergoing BESTEST-EX. This example method for BESTEST-EX is a modified version of the method described in HERS BESTEST.

  4. 16 CFR 1616.5 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1616.5 Section 1616.5... FLAMMABILITY OF CHILDREN'S SLEEPWEAR: SIZES 7 THROUGH 14 (FF 5-74) The Standard § 1616.5 Test procedure. (a) Apparatus. The following test apparatus shall be used for the test. Alternate test apparatus may be...

  5. Product acceptance environmental and destructive testing for reliability.

    SciTech Connect

    Dvorack, Michael A.; Kerschen, Thomas J.; Collins, Elmer W.

    2007-08-01

    To determine whether a component is meeting its reliability requirement during production, acceptance sampling is employed in which selected units coming off the production line are subjected to additional environmental and/or destructive tests that are within the normal environment space to which the component is expected to be exposed throughout its life in the Stockpile. This report describes what these tests are and how they are scored for reliability purposes. The roles of screens, Engineering Use Only tests, and next assembly product acceptance testing are also discussed, along with both the advantages and disadvantages of environmental and destructive testing.

  6. 16 CFR 1631.4 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1631.4 Section 1631.4... SURFACE FLAMMABILITY OF SMALL CARPETS AND RUGS (FF 2-70) The Standard § 1631.4 Test procedure. (a) Apparatus—(1) Test chamber. The test chamber shall consist of an open top hollow cube made of...

  7. 16 CFR 1630.4 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1630.4 Section 1630.4... SURFACE FLAMMABILITY OF CARPETS AND RUGS (FF 1-70) The Standard § 1630.4 Test procedure. (a) Apparatus—(1) Test chamber. The test chamber shall consist of an open top hollow cube made of noncombustible...

  8. 16 CFR 1615.4 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1615.4 Section 1615.4... FLAMMABILITY OF CHILDREN'S SLEEPWEAR: SIZES 0 THROUGH 6X (FF 3-71) The Standard § 1615.4 Test procedure. (a) Apparatus—(1) Test chamber. The test chamber shall be a steel cabinet with inside dimensions of 32.9 cm....

  9. 16 CFR 1510.4 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1510.4 Section 1510.4... REQUIREMENTS FOR RATTLES § 1510.4 Test procedure. Place the test fixture shown in Figure 1 on a horizontal plane surface. Under its own weight and in a non-compressed state apply any portion of the test...

  10. Peer-Mediated Procedures to Induce Swallowing and Food Acceptance in Young Children.

    ERIC Educational Resources Information Center

    Greer, R. Douglas; And Others

    1991-01-01

    A peer modeling procedure was shown to induce swallowing in a young child with dysphagia, and to increase food acceptance in a young child who consistently declined food. A peer-mediated procedure, consisting of rotated opportunities to consume food with a peer, increased consumption more than did modeling alone. (Author/JDD)

  11. Scaling the Acceptability of Behavior Decelerative Procedures: Perceptions of Staff Working with Persons with Developmental Disabilities.

    ERIC Educational Resources Information Center

    Allison, David B.; Silverstein, Jay M.

    This study sought to examine the structure and consistency of perceptions of behavior deceleration procedures within populations, provide a preliminary "index" of acceptability, determine if these procedures can be categorized into meaningful groups, and examine the consistency of perceptions across populations. Subjects were 20…

  12. 10 CFR 32.110 - Acceptance sampling procedures under certain specific licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Acceptance sampling procedures under certain specific licenses. 32.110 Section 32.110 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES TO MANUFACTURE OR TRANSFER CERTAIN ITEMS CONTAINING BYPRODUCT MATERIAL Quality Control Sampling Procedures §...

  13. 32 CFR 1904.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INTELLIGENCE AGENCY PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1904.3 Procedures governing... addressed as follows: Litigation Division, Office of General Counsel, Central Intelligence Agency... Director and Deputy Director of Central Intelligence—in his or her individual capacity. (3) Mail...

  14. 32 CFR 1904.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... INTELLIGENCE AGENCY PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1904.3 Procedures governing... addressed as follows: Litigation Division, Office of General Counsel, Central Intelligence Agency... Director and Deputy Director of Central Intelligence—in his or her individual capacity. (3) Mail...

  15. 32 CFR 1904.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... INTELLIGENCE AGENCY PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1904.3 Procedures governing... addressed as follows: Litigation Division, Office of General Counsel, Central Intelligence Agency... Director and Deputy Director of Central Intelligence—in his or her individual capacity. (3) Mail...

  16. 32 CFR 1904.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... INTELLIGENCE AGENCY PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1904.3 Procedures governing... addressed as follows: Litigation Division, Office of General Counsel, Central Intelligence Agency... Director and Deputy Director of Central Intelligence—in his or her individual capacity. (3) Mail...

  17. Judgments of Restrictiveness, Social Acceptability, and Usage: Review of Research on Procedures to Decrease Behavior.

    ERIC Educational Resources Information Center

    Morgan, Robert L.

    1989-01-01

    The article reviewed research on professionals', consumers', and others' judgments of the restrictiveness, social acceptability, and estimated frequency of use of procedures to decrease problem behaviors of disabled persons. Most respondents agreed that more restrictive procedures should be used as a last resort and that less restrictive…

  18. ISOLOK VALVE ACCEPTANCE TESTING FOR DWPF SME SAMPLING PROCESS

    SciTech Connect

    Edwards, T.; Hera, K.; Coleman, C.; Jones, M.; Wiedenman, B.

    2011-12-05

    were compared to determine if the contents of the tank were well mixed. The Coliwasa sampler is a tube with a stopper at the bottom and is designed to obtain grab samples from specific locations within the drum contents. A position paper (4) was issued to address the prototypic flow loop issues and simulant selections. A statistically designed plan (5) was issued to address the total number of samples each sampler needed to pull, to provide the random order in which samples were pulled and to group samples for elemental analysis. The TTR required that the Isolok sampler perform as well as the Hydragard sampler during these tests to ensure the acceptability of the Isolok sampler for use in the DWPF sampling cells. Procedure No.L9.4-5015 was used to document the sample parameters and process steps. Completed procedures are located in R&D Engineering job folder 23269.

  19. Diesel emission production audit test procedure. SAE standard

    SciTech Connect

    1995-06-01

    This SAE Recommended Practice applies to a production dynamometer test procedure which can be used to measure the smoke and gaseous emission characteristics of vehicular diesel engines. This procedure describes the smoke emission test method, smoke test cycle, gaseous emission test method, steady-state gaseous emission test cycle, equipment, instrumentation, calibration, data analysis, and correlation of results for comparison of production engine emission performance to the requirements of current or past Federal regulations. Variations in engines, instrumentation, and test equipment may require modifications to these procedures or data reduction methods. The acceptability of this procedure is dependent upon documented statistical data appropriate to correlate all tests, data reduction techniques, and special instrumentation to the required Federal tests. When using the audit test procedure to assess the emissions performance of production engines, considerations should be given to expected emissions deterioration factors and quality control limits should be adjusted accordingly. This document is intended as a guide for the measurement and assessment of transient smoke and steady-state gaseous emissions from heavy duty vehicular diesel engines only using a shortened engine dynamometer cycle which may be applicable to production line or production quality audit conditions. Key elements of the procedure closely resemble key elements of the federal rest procedures used for regulatory approval by the United States Government.

  20. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be...

  1. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be...

  2. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be...

  3. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be...

  4. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedures. 91.507 Section 91.507... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed...

  5. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedures. 94.506 Section 94.506... Test procedures. (a)(1) For engines subject to the provisions of this subpart, the prescribed test...) The Administrator may, on the basis of a written application by a manufacturer, prescribe...

  6. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be...

  7. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Test procedure. 33.37 Section 33.37 Mineral... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.37 Test procedure. (a) Roof drilling: Drilling shall be done in friable strata, similar to...

  8. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Test procedure. 33.37 Section 33.37 Mineral... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.37 Test procedure. (a) Roof drilling: Drilling shall be done in friable strata, similar to...

  9. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 91.507 Section 91.507... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed...

  10. 16 CFR 1301.7 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedures. 1301.7 Section 1301.7 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS BAN OF UNSTABLE REFUSE BINS § 1301.7 Test procedures. (a) The refuse bin shall be tested by applying forces...

  11. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Test procedure. 33.37 Section 33.37 Mineral... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.37 Test procedure. (a) Roof drilling: Drilling shall be done in friable strata, similar to...

  12. 16 CFR 1201.4 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedures. 1201.4 Section 1201.4... STANDARD FOR ARCHITECTURAL GLAZING MATERIALS The Standard § 1201.4 Test procedures. (a) Types of tests—(1) Impact test. Specimens shall be struck as prescribed by paragraph (d)(1) of this section using...

  13. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF...; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... Schedule and Urban Dynamometer Driving Schedule test cycles at 40 CFR parts 86 and 600. (b) The...

  14. 40 CFR 53.43 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... material collected with the test sampler using a calibrated fluorometer. Calculate and record the mass... 40 Protection of Environment 6 2012-07-01 2012-07-01 false Test procedures. 53.43 Section 53.43... PM10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio...

  15. 40 CFR 53.43 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... material collected with the test sampler using a calibrated fluorometer. Calculate and record the mass... 40 Protection of Environment 6 2014-07-01 2014-07-01 false Test procedures. 53.43 Section 53.43... PM 10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The...

  16. Standard-B auto grab sampler hydrogen monitoring system, Acceptance Test Report

    SciTech Connect

    Lott, D.T.

    1995-05-18

    Project W-369, Watch List Tank Hydrogen Monitors, installed a Standard-C Hydrogen Monitoring System (SHMS) on the Flammable gas waste tank AN-104. General Support Projects (8K510) was support by Test Engineering (7CH30) in the performance of the Acceptance Test Procedures (ATP) to qualify the SHMS cabinets on the waste tank. The ATP`s performance was controlled by Tank Farm work package. This completed ATP is transmitted by EDT-601748 as an Acceptance Test Report (ATR) in accordance with WHC-6-1, EP 4.2 and EP 1.12.

  17. Regulatory perspectives on acceptability testing of dosage forms in children.

    PubMed

    Kozarewicz, Piotr

    2014-08-05

    Current knowledge about the age-appropriateness of different dosage forms is still fragmented or limited. Applicants are asked to demonstrate that the target age group(s) can manage the dosage form or propose an alternative strategy. However, questions remain about how far the applicant must go and what percentage of patients must find the strategy 'acceptable'. The aim of this overview is to provide an update on current thinking and understanding of the problem, and discuss issues relating to the acceptability testing. This overview should be considered as means to start a wider discussion which hopefully will result in a harmonised, globally acceptable approach for confirmation of the acceptability in the future.

  18. Acceptance Test Plan for the Sludge Pickup Adaptor

    SciTech Connect

    PITNER, A.L.

    2000-03-29

    This test plan documents the acceptance testing of the sludge pickup adapter for potential use during PSI Phases 3 and 4 fuel cleanliness inspection activities. The adaptex is attached to the strainer tip of the vacuum wand and used to suction up residual sludge captured in a sludge collection tray. The material is vacuumed into a chamber of known volume in the sludge pickup adapter. The device serves as an aid in helping to determine whether the observed quantity of sludge is within allowable limits (1.4 cm{sup 3} per fuel assembly). This functionality test involves underwater testing in the 305 Building Cold Test Facility to verify that sludge can be successfully vacuumed from a collection tray. Ancillary activities in this acceptance test include demonstration that the sludge pickup adapter CM be successfully attached to and detached from the vacuum wand underwater.

  19. 40 CFR 53.66 - Test procedure: Volatility test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling...

  20. 40 CFR 53.65 - Test procedure: Loading test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 6 2014-07-01 2014-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM 2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method...

  1. 40 CFR 53.65 - Test procedure: Loading test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method...

  2. 40 CFR 53.66 - Test procedure: Volatility test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling...

  3. 40 CFR 53.65 - Test procedure: Loading test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method...

  4. 40 CFR 53.66 - Test procedure: Volatility test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 6 2014-07-01 2014-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM 2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling...

  5. 40 CFR 53.65 - Test procedure: Loading test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 6 2012-07-01 2012-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method...

  6. 40 CFR 53.66 - Test procedure: Volatility test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 6 2012-07-01 2012-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling...

  7. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... required for testing the energy consumption of electric vehicles....

  8. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... required for testing the energy consumption of electric vehicles....

  9. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... required for testing the energy consumption of electric vehicles....

  10. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... required for testing the energy consumption of electric vehicles....

  11. 49 CFR 399.209 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Test procedures. 399.209 Section 399.209 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY... STANDARDS Step, Handhold, and Deck Requirements for Commercial Motor Vehicles § 399.209 Test procedures....

  12. 40 CFR 53.43 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedures. 53.43 Section 53.43... PM10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio (expressed... or filters to the mass concentration of particles of the same size approaching the sampler. (2)...

  13. 40 CFR 91.607 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 91.607 Section 91.607... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Selective Enforcement Auditing Regulations § 91.607 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed...

  14. 40 CFR 53.43 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedures. 53.43 Section 53.43... PM10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio (expressed... or filters to the mass concentration of particles of the same size approaching the sampler. (2)...

  15. 49 CFR 399.209 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Test procedures. 399.209 Section 399.209 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY... STANDARDS Step, Handhold, and Deck Requirements for Commercial Motor Vehicles § 399.209 Test procedures....

  16. 40 CFR 90.508 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Test procedures. 90.508 Section 90.508 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF....508 Test procedures. (a) For nonroad engines subject to the provisions of this subpart, the...

  17. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  18. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  19. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  20. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  1. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  2. SEP BIMOD variable conductance heat pipes acceptance and characterization tests

    NASA Technical Reports Server (NTRS)

    Hemminger, J. A.

    1981-01-01

    A series of six heat pipes, similar in design to those flown on the Comunications Technology Satellite Hermes, for use in a prototype Solar Electric Propulsion BIMOD thrust module are evaluated. The results of acceptance and characterization tests performed on the heat pipe subassemble are reported. The performance of all the heat pipes met, or exceeded, design specifications.

  3. Proposed Performance Evaluation Acceptance Test for Heat Recovery Incinerators

    DTIC Science & Technology

    1988-08-01

    1985). D 3176, Method for Ultimate Analysis of Coal and Coke (1984). D 3180, Method for Calculating Coal and Coke Analyses from As-Determined to Differ...or approval of the use of such commercial products . The findings of this report are not to be construed as an official Department of the Army position...such as coal or oil fired boilers, no standard performance test is available to assess field performance or to use as an acceptance test for the HRI

  4. Redstone Test Stand Accepted Into National Register of Historical Places

    NASA Technical Reports Server (NTRS)

    1976-01-01

    On October 02, 1976, Marshall Space Flight Center's (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand are Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, as he is accepting a certificate of registration from Madison County Commission Chairman James Record, and Huntsville architect Harvie Jones.

  5. Development and application of an acceptance testing model

    NASA Technical Reports Server (NTRS)

    Pendley, Rex D.; Noonan, Caroline H.; Hall, Kenneth R.

    1992-01-01

    The process of acceptance testing large software systems for NASA has been analyzed, and an empirical planning model of the process constructed. This model gives managers accurate predictions of the staffing needed, the productivity of a test team, and the rate at which the system will pass. Applying the model to a new system shows a high level of agreement between the model and actual performance. The model also gives managers an objective measure of process improvement.

  6. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA, JUNE 2006

    SciTech Connect

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE

    2006-06-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  7. W-026 acceptance test report system integration equipment (SIE)(submittal {number_sign} 018.6.A)

    SciTech Connect

    Watson, T.L.

    1997-01-27

    Acceptance testing of the System Integration Equipment (SIE) at Hanford was performed in two stages. The first was inconclusive, and resulted in a number of findings. These finding. are summarized as part of this report. The second stage of testing addressed these findings, and performed full system testing per the approved test procedure. This report includes summaries of all testing, results and finding.. Although the SIE did not in some cases perform as required for plant operations, it did perform per the system specification. (These discrepancies were noted and are addressed elsewhere.) Following testing, the system was formaLLy accepted. Documentation of this acceptance is incLuded in this report.

  8. Startup of the FFTF sodium cooled reactor. [Acceptance Test Program

    SciTech Connect

    Redekopp, R.D.; Umek, A.M.

    1981-03-01

    The Fast Flux Test Facility (FFTF), located on the Department of Energy (DOE) Hanford Reservation near Richland, Washington, is a 3 Loop 400 MW(t) sodium cooled fast reactor with a primary mission to test fuels and materials for development of the Liquid Metal Fast Breeder Reactor (LMFBR). Bringing FFTF to a condition to accomplish this mission is the goal of the Acceptance Test Program (ATP). This program was the mechanism for achieving startup of the FFTF. Highlights of the ATP involving the system inerting, liquid metal and inerted cell testing and initial ascent to full power are discussed.

  9. Test Operations Procedure (TOP): Transportability

    DTIC Science & Technology

    2008-09-15

    respectively. The barge carrier/mother ship is self-sustaining. The LASH system uses a gantry crane to load its lighters, while the SEABEE system has an...and lateral pull restraints Boom/Overhead crane anchors Vertical (up/down) load application Horizontal load application device To apply load in...test operations 2.1.4 Marine Transportability. Item Requirement Marine vessel Means of loading cargo with ship crane Dockside or on-board

  10. Evaluation and certification of heater assemblies developed for thermal vacuum acceptance testing

    NASA Technical Reports Server (NTRS)

    Allen, J. E.

    1986-01-01

    Preparation of Rockwell International's Thermal Vacuum Chamber for acceptance testing of a mass produced satellite required the development of unique quartz lamp and hot wire heater assemblies. Testing performed on the basic elements of these heaters is described, as is the final testing done to certify that the heater assemblies meet the thermal requirements for acceptance testing. The methods and procedures of thermal mapping used during the development and final certification of these heater assemblies are presented. The absence of a definitive standard for determining flux distribution and heating boundaries for heaters of this type required the development of a test plan incorporating several thermal mapping techniques. These techniques include the development of heat flux using a multiple calorimeter array for both vacuum and ambient test conditions, and a photographic method for detecting heating boundaries. The test plan and thermal mapping techniques are discussed.

  11. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES Manufacturer Production Line Testing Programs § 94.506... test procedures used in certification for production line testing. (b)(1) The manufacturer may not... subject to adjustment for certification and production line testing, to any setting within the...

  12. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES Manufacturer Production Line Testing Programs § 94.506... test procedures used in certification for production line testing. (b)(1) The manufacturer may not... subject to adjustment for certification and production line testing, to any setting within the...

  13. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES Manufacturer Production Line Testing Programs § 94.506... test procedures used in certification for production line testing. (b)(1) The manufacturer may not... subject to adjustment for certification and production line testing, to any setting within the...

  14. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL OF EMISSIONS FROM LOCOMOTIVES Manufacturer and Remanufacturer Production Line Testing and Audit... instead of a low mileage locomotive), use the same test procedures for production line testing that you... production line testing, and an adjustment or repair is necessary because of such shipment, you may...

  15. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL OF EMISSIONS FROM LOCOMOTIVES Manufacturer and Remanufacturer Production Line Testing and Audit... instead of a low mileage locomotive), use the same test procedures for production line testing that you... production line testing, and an adjustment or repair is necessary because of such shipment, you may...

  16. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES Manufacturer Production Line Testing Programs § 94.506... test procedures used in certification for production line testing. (b)(1) The manufacturer may not... subject to adjustment for certification and production line testing, to any setting within the...

  17. 46 CFR 164.120-15 - Procedure for acceptance of material change.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Procedure for acceptance of material change. 164.120-15 Section 164.120-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Fire Retardant Resins for Lifeboats...

  18. 46 CFR 164.120-15 - Procedure for acceptance of material change.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Procedure for acceptance of material change. 164.120-15 Section 164.120-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Fire Retardant Resins for Lifeboats...

  19. 46 CFR 164.120-15 - Procedure for acceptance of material change.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Procedure for acceptance of material change. 164.120-15 Section 164.120-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Fire Retardant Resins for Lifeboats...

  20. 46 CFR 160.062-7 - Procedures for acceptance of repair facility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., Hydraulic and Manual § 160.062-7 Procedures for acceptance of repair facility. (a) Before a repair facility... a hydraulic release, evidenced by a signed agreement between the facility and his source of supply... paragraph. Each employee who is engaged in serving a hydraulic release must demonstrate his competence...

  1. 46 CFR 160.062-7 - Procedures for acceptance of repair facility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., Hydraulic and Manual § 160.062-7 Procedures for acceptance of repair facility. (a) Before a repair facility... a hydraulic release, evidenced by a signed agreement between the facility and his source of supply... paragraph. Each employee who is engaged in serving a hydraulic release must demonstrate his competence...

  2. 46 CFR 160.062-7 - Procedures for acceptance of repair facility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., Hydraulic and Manual § 160.062-7 Procedures for acceptance of repair facility. (a) Before a repair facility... a hydraulic release, evidenced by a signed agreement between the facility and his source of supply... paragraph. Each employee who is engaged in serving a hydraulic release must demonstrate his competence...

  3. 46 CFR 160.062-7 - Procedures for acceptance of repair facility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., Hydraulic and Manual § 160.062-7 Procedures for acceptance of repair facility. (a) Before a repair facility... a hydraulic release, evidenced by a signed agreement between the facility and his source of supply... paragraph. Each employee who is engaged in serving a hydraulic release must demonstrate his competence...

  4. 46 CFR 160.062-7 - Procedures for acceptance of repair facility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., Hydraulic and Manual § 160.062-7 Procedures for acceptance of repair facility. (a) Before a repair facility... a hydraulic release, evidenced by a signed agreement between the facility and his source of supply... paragraph. Each employee who is engaged in serving a hydraulic release must demonstrate his competence...

  5. 46 CFR 164.019-5 - Standard components; acceptance criteria and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Standard components; acceptance criteria and procedures. 164.019-5 Section 164.019-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Personal Flotation...

  6. 46 CFR 164.019-5 - Standard components; acceptance criteria and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Standard components; acceptance criteria and procedures. 164.019-5 Section 164.019-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Personal Flotation...

  7. 46 CFR 164.019-9 - Procedure for acceptance of revisions of design, process, or materials.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Procedure for acceptance of revisions of design, process, or materials. 164.019-9 Section 164.019-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Personal...

  8. 46 CFR 164.019-9 - Procedure for acceptance of revisions of design, process, or materials.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Procedure for acceptance of revisions of design, process, or materials. 164.019-9 Section 164.019-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Personal...

  9. 46 CFR 164.019-9 - Procedure for acceptance of revisions of design, process, or materials.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Procedure for acceptance of revisions of design, process, or materials. 164.019-9 Section 164.019-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Personal...

  10. 46 CFR 164.019-9 - Procedure for acceptance of revisions of design, process, or materials.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Procedure for acceptance of revisions of design, process, or materials. 164.019-9 Section 164.019-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Personal...

  11. 32 CFR 1702.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... THE DIRECTOR OF NATIONAL INTELLIGENCE PROCEDURES GOVERNING THE ACCEPTANCE OF SERVICE OF PROCESS § 1702... Intelligence, Office of General Counsel, Washington, DC 20511, and the envelope must be conspicuously marked... capacity. Except for the DNI, the Principal Deputy Director of National Intelligence, and the Director...

  12. 32 CFR 1702.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... THE DIRECTOR OF NATIONAL INTELLIGENCE PROCEDURES GOVERNING THE ACCEPTANCE OF SERVICE OF PROCESS § 1702... Intelligence, Office of General Counsel, Washington, DC 20511, and the envelope must be conspicuously marked... capacity. Except for the DNI, the Principal Deputy Director of National Intelligence, and the Director...

  13. 32 CFR 1702.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... THE DIRECTOR OF NATIONAL INTELLIGENCE PROCEDURES GOVERNING THE ACCEPTANCE OF SERVICE OF PROCESS § 1702... Intelligence, Office of General Counsel, Washington, DC 20511, and the envelope must be conspicuously marked... capacity. Except for the DNI, the Principal Deputy Director of National Intelligence, and the Director...

  14. 32 CFR 1702.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... THE DIRECTOR OF NATIONAL INTELLIGENCE PROCEDURES GOVERNING THE ACCEPTANCE OF SERVICE OF PROCESS § 1702... Intelligence, Office of General Counsel, Washington, DC 20511, and the envelope must be conspicuously marked... capacity. Except for the DNI, the Principal Deputy Director of National Intelligence, and the Director...

  15. 32 CFR 1702.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... THE DIRECTOR OF NATIONAL INTELLIGENCE PROCEDURES GOVERNING THE ACCEPTANCE OF SERVICE OF PROCESS § 1702... Intelligence, Office of General Counsel, Washington, DC 20511, and the envelope must be conspicuously marked... capacity. Except for the DNI, the Principal Deputy Director of National Intelligence, and the Director...

  16. Acceptability of Functional Behavioral Assessment Procedures to Special Educators and School Psychologists

    ERIC Educational Resources Information Center

    O'Neill, Robert E.; Bundock, Kaitlin; Kladis, Kristin; Hawken, Leanne S.

    2015-01-01

    This survey study assessed the acceptability of a variety of functional behavioral assessment (FBA) procedures (i.e., functional assessment interviews, rating scales/questionnaires, systematic direct observations, functional analysis manipulations) to a national sample of 123 special educators and a state sample of 140 school psychologists.…

  17. Retrofit and acceptance test of 30-cm ion thrusters

    NASA Technical Reports Server (NTRS)

    Poeschel, R. L.

    1981-01-01

    Six 30 cm mercury thrusters were modified to the J-series design and evaluated using standardized test procedures. The thruster performance meets the design objectives (lifetime objective requires verification), and documentation (drawings, etc.) for the design is completed and upgraded. The retrofit modifications are described and the test data for the modifications are presented and discussed.

  18. Surface moisture measurement system hardware acceptance test report

    SciTech Connect

    Ritter, G.A., Westinghouse Hanford

    1996-05-28

    This document summarizes the results of the hardware acceptance test for the Surface Moisture Measurement System (SMMS). This test verified that the mechanical and electrical features of the SMMS functioned as designed and that the unit is ready for field service. The bulk of hardware testing was performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. The SMMS was developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks.

  19. Effectiveness and relevance of MR acceptance testing: results of an 8 year audit.

    PubMed

    McRobbie, D W; Quest, R A

    2002-06-01

    The effectiveness and relevance of independent acceptance testing was assessed by means of an audit of acceptance procedures for 17 MRI systems, with field strengths in the range 0.5-1.5 T, acquired over 8 years. Signal-to-noise ratio and geometric linearity were found to be the image quality parameters most likely to fall below acceptable or expected standards. These received confirmed successful corrective action in 69% of instances. Non-uniformity, ghosting and poor fat suppression were the next most common non-compliant parameters, but yielded less satisfactory outcomes. Spatial resolution was not found to be a sensitive parameter in determining acceptability. 49% of all non-compliant parameters received verifiable corrective attention. A schedule of actual acceptance criteria is presented and shown to be reasonable. Parameter failure rates were shown not to have improved with time. A safety audit of 11 of the installations revealed the most common failings to be inadequate suite layout and poor use of signs. The mean number of safety issues per installation identified as requiring attention was 5, from a questionnaire of 100 points. A number of anecdotal errors and omissions are reported. The data support the importance of an appropriate acceptance procedure for new clinical MRI equipment and for the involvement of a suitably qualified safety adviser on the project team from the outset.

  20. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 6 2014-07-01 2014-07-01 false Test procedure: Static fractionator... Performance Characteristics of Class II Equivalent Methods for PM 2.5 § 53.64 Test procedure: Static... when reevaluating the curve as specified in the loading test. (2) Static chamber method....

  1. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 6 2012-07-01 2012-07-01 false Test procedure: Static fractionator... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static... when reevaluating the curve as specified in the loading test. (2) Static chamber method....

  2. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedure: Static fractionator... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static... when reevaluating the curve as specified in the loading test. (2) Static chamber method....

  3. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 6 2013-07-01 2013-07-01 false Test procedure: Static fractionator... Performance Characteristics of Class II Equivalent Methods for PM 2.5 § 53.64 Test procedure: Static... when reevaluating the curve as specified in the loading test. (2) Static chamber method....

  4. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Static fractionator test. 53.64 Section 53.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure:...

  5. DOT-7A packaging test procedure

    SciTech Connect

    Kelly, D.L.

    1995-01-23

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  6. MCO combustible gas management leak test acceptance criteria

    SciTech Connect

    SHERRELL, D.L.

    1999-05-11

    Existing leak test acceptance criteria for mechanically sealed and weld sealed multi-canister overpacks (MCO) were evaluated to ensure that MCOs can be handled and stored in stagnant air without compromising the Spent Nuclear Fuel Project's overall strategy to prevent accumulation of combustible gas mixtures within MCO's or within their surroundings. The document concludes that the integrated leak test acceptance criteria for mechanically sealed and weld sealed MCOs (1 x 10{sup -5} std cc/sec and 1 x 10{sup -7} std cc/sec, respectively) are adequate to meet all current and foreseeable needs of the project, including capability to demonstrate compliance with the NFPA 60 Paragraph 3-3 requirement to maintain hydrogen concentrations [within the air atmosphere CSB tubes] t or below 1 vol% (i.e., at or below 25% of the LFL).

  7. Acceptance test plan for the Waste Information Control System

    SciTech Connect

    Flynn, D.F.

    1994-09-14

    This document describes the acceptance test plan for the WICS system. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE).

  8. Development of Performance Acceptance Test Guidelines for Large Commercial Parabolic Trough Solar Fields: Preprint

    SciTech Connect

    Kearney, D.; Mehos, M.

    2010-12-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the EPC contractor or owners. In lieu of the present absence of engineering code developed for this purpose, NREL has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The fundamental differences between acceptance of a solar power plant and a conventional fossil-fired plant are the transient nature of the energy source and the necessity to utilize an analytical performance model in the acceptance process. These factors bring into play the need to establish methods to measure steady state performance, potential impacts of transient processes, comparison to performance model results, and the possible requirement to test, or model, multi-day performance within the scope of the acceptance test procedure. The power block and BOP are not within the boundaries of this guideline. The current guideline is restricted to the solar thermal performance of parabolic trough systems and has been critiqued by a broad range of stakeholders in CSP development and technology.

  9. Thread-compound test procedures being developed

    SciTech Connect

    Wood, F.; Dairymple, D. ); McKown, K.; Matthews, B. )

    1990-09-10

    API is planning to issue a new bulletin that will outline standardization test procedures and set minimum performance for thread compounds used on OCTG (oil country tubular goods) connections with API thread forms. These performance standards will replace the recommended compound described in API Bulletin 5A2. This paper discusses how the proposed bulletin will detail test equipment, procedures, and performance requirements for thread compounds.

  10. YF-16 flight flutter test procedures

    NASA Technical Reports Server (NTRS)

    Brignac, W. J.; Ness, H. B.; Johnson, M. K.; Smith, L. M.

    1976-01-01

    The Random Decrement technique (Randomdec) was incorporated in procedures for flight testing of the YF-16 lightweight fighter prototype. Damping values obtained substantiate the adequacy of the flutter margin of safety. To confirm the structural modes which were being excited, a spectral analysis of each channel was performed using the AFFTC time/data 1923/50 time series analyzer. Inflight test procedure included the careful monitoring of strip charts, three axis pulses, rolls, and pullups.

  11. Nevada Test Site waste acceptance criteria [Revision 1

    SciTech Connect

    1997-08-01

    Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  12. Test procedure for boxed waste assay system

    SciTech Connect

    Wachter, J.

    1994-12-07

    This document, prepared by Los Alamos National Laboratory`s NMT-4 group, details the test methodology and requirements for Acceptance/Qualification testing of a Boxed Waste Assay System (BWAS) designed and constructed by Pajarito Scientific Corporation. Testing of the BWAS at the Plutonium Facility (TA55) at Los Alamos National Laboratory will be performed to ascertain system adherence to procurement specification requirements. The test program shall include demonstration of conveyor handling capabilities, gamma ray energy analysis, and imaging passive/active neutron accuracy and sensitivity. Integral to these functions is the system`s embedded operating and data reduction software.

  13. AUSSAT-B spacecraft qualification and acceptance testing

    NASA Astrophysics Data System (ADS)

    Pike, Gordon H. S.; Day, Robert S.; Gatta, John D.

    The AUSSAT-B spacecraft are the first two examples of the new HS601 series of body stabi1ized satellites being built by Hughes Aircraft Company. Prior to the first launch in early 1992, the satellites will have been subjected to extensive unit, subsystem, and system level tests. The satellites will also undergo thorough in-orbit tests after being delivered on-station. This paper concentrates on the subsystem and system level tests for qualification and acceptance of the satellites. Because the anticipated market for the HS601 design includes both commercial and Government (including military) applications the qualification and protoflight philosophy adopted for the first flight spacecraft program represents a potentially unique combination of test requirements.

  14. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    SciTech Connect

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  15. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.37 Test procedure. (a) Roof drilling: Drilling shall be done in friable strata, similar to the...) Horizontal drilling: Drilling shall be done in strata comparable in hardness to that of coal-mine draw...

  16. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.37 Test procedure. (a) Roof drilling: Drilling shall be done in friable strata, similar to the...) Horizontal drilling: Drilling shall be done in strata comparable in hardness to that of coal-mine draw...

  17. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times each... that it touches, but does not move, the test device, with the vehicle's longitudinal centerline... prior impact, unless the midpoint of the impact line with respect to the vehicle is to be more than...

  18. Th Matching Paradigm: An Exact Test Procedure.

    ERIC Educational Resources Information Center

    Gillett, Raphael

    1985-01-01

    Provides a framework based on rook methodology for constructing exact unweighted tests in the matching paradigm. This paradigm tests whether a one-to-one pairing configuration between objects in two arrays contains more pairings of a particular kind than expected under the null hypothesis. The procedure is particularly useful for small samples.…

  19. Characterization and acceptance testing of fully depleted thick CCDs for the large synoptic survey telescope

    NASA Astrophysics Data System (ADS)

    Kotov, Ivan V.; Haupt, Justine; O'Connor, Paul; Smith, Thomas; Takacs, Peter; Neal, Homer; Chiang, Jim

    2016-07-01

    The Large Synoptic Survey Telescope (LSST) camera will be made as a mosaic assembled of 189 large format Charge Coupled Devices (CCD). They are n-channel, 100 micron thick devices operated in the over depleted regime. There are 16 segments, 1 million pixels each, that are read out through separate amplifiers. The image quality and readout speed expected from LSST camera translates into strict acceptance requirements for individual sensors. Prototype sensors and preproduction CCDs were delivered by vendors and they have been used for developing test procedures and protocols. Building upon this experience, two test stands were designed and commissioned at Brookhaven National Laboratory for production electro-optical testing. In this article, the sensor acceptance criteria are outlined and discussed, the test stand design and used equipment are presented and the results from commissioning sensor runs are shown.

  20. Trust, confidence, procedural fairness, outcome fairness, moral conviction, and the acceptance of GM field experiments.

    PubMed

    Siegrist, Michael; Connor, Melanie; Keller, Carmen

    2012-08-01

    In 2005, Swiss citizens endorsed a moratorium on gene technology, resulting in the prohibition of the commercial cultivation of genetically modified crops and the growth of genetically modified animals until 2013. However, scientific research was not affected by this moratorium, and in 2008, GMO field experiments were conducted that allowed us to examine the factors that influence their acceptance by the public. In this study, trust and confidence items were analyzed using principal component analysis. The analysis revealed the following three factors: "economy/health and environment" (value similarity based trust), "trust and honesty of industry and scientists" (value similarity based trust), and "competence" (confidence). The results of a regression analysis showed that all the three factors significantly influenced the acceptance of GM field experiments. Furthermore, risk communication scholars have suggested that fairness also plays an important role in the acceptance of environmental hazards. We, therefore, included measures for outcome fairness and procedural fairness in our model. However, the impact of fairness may be moderated by moral conviction. That is, fairness may be significant for people for whom GMO is not an important issue, but not for people for whom GMO is an important issue. The regression analysis showed that, in addition to the trust and confidence factors, moral conviction, outcome fairness, and procedural fairness were significant predictors. The results suggest that the influence of procedural fairness is even stronger for persons having high moral convictions compared with persons having low moral convictions.

  1. Braking, Wheeled Vehicles. Test Operations Procedure (TOP)

    DTIC Science & Technology

    2008-05-20

    are as follows: a. Micrometer calipers (inside, outside, and dial types). b. Surface finish gauges. c. Torque wrench. d. Brake shoe...is imminent. 11. Front Disc Brakes Procedure: Step 1: Visually inspect and measure rotors, calipers , and pads. Equipment needed...4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 2-2-608 Braking , Wheeled Vehicles 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER 5e

  2. Waste retrieval sluicing system data acquisition system acceptance test report

    SciTech Connect

    Bevins, R.R.

    1998-07-31

    This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115.

  3. Standard-E hydrogen monitoring system shop acceptance test procedure

    SciTech Connect

    Schneider, T.C.

    1997-10-02

    The purpose of this report is to document that the Standard-E Hydrogen Monitoring Systems (SHMS-E), fabricated by Mid-Columbia Engineering (MCE) for installation on the Waste Tank Farms in the Hanford 200 Areas, are constructed as intended by the design. The ATP performance will verify proper system fabrication.

  4. Biomonitoring test procedures and biological criteria

    SciTech Connect

    Kszos, L.A.; Lipschultz, M.J.; Foster, W.E.

    1997-10-01

    The Water Environment Federation recently issued a special publication, Biomonitoring in the Water Environment. In this paper, the authors highlight the contents of the chapter 3, Biomonitoring Test Procedures, identify current trends in test procedures and introduce the concept of biological criteria (biocriteria). The book chapter (and this paper) focuses on freshwater and marine chronic and acute toxicity tests used in the National Pollutant Discharge Elimination System (NPDES) permits program to identify effluents and receiving waters containing toxic materials in acutely or chronically toxic concentrations. The two major categories of toxicity tests include acute tests and chronic tests. The USEPA chronic tests required in NPDEs permits have been shortened to 7 days by focusing on the most sensitive life-cycle stages; these tests are often referred to as short-term chronic tests. The type of test(s) required depend on NPDES permit requirements, objectives of the test, available resources, requirements of the test organisms, and effluent characteristics such as variability in flow or toxicity. The permit writer will determine the requirements for toxicity test(s) by considering such factors as dilution, effluent variability, and exposure variability. Whether the required test is acute or chronic, the objective of the test is to estimate the safe or no effect concentration which is defined as the concentration which will permit normal propagation of fish and other aquatic life in the receiving waters. In this paper, the authors review the types of toxicity tests, the commonly used test organisms, and the uses of toxicity test data. In addition, they briefly describe research on new methods and the use of biological criteria.

  5. 7 CFR 1755.400 - RUS standard for acceptance tests and measurements of telecommunications plant.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false RUS standard for acceptance tests and measurements of..., ACCEPTABLE MATERIALS, AND STANDARD CONTRACT FORMS § 1755.400 RUS standard for acceptance tests and... acceptance tests and measurements on installed copper and fiber optic telecommunications plant and equipment....

  6. Topographical mapping system for radiological and hazardous environments acceptance testing

    NASA Astrophysics Data System (ADS)

    Armstrong, Gary A.; Dochat, G. R.

    1997-09-01

    During the summer of 1996, the topographical mapping system (TMS) for hazardous and radiological environments and its accompanying three-dimensional (3-D) visualization tool, the interactive computer-enhanced remote-viewing system (ICERVS), were delivered to Oak Ridge National Laboratory (ORNL). ORNL and Mechanical Technology, Inc., performed final acceptance testing of the TMS during the next eight months. The TMS was calibrated and characterized during this period. This paper covers the calibration, characterization, and acceptance testing of the TMS. Development of the TMS and the ICERVS was initiated by the U.S. Department of Energy (DOE) for the purpose of characterization and remediation of underground storage tanks (USTs) at DOE sites across the country. DOE required a 3-D, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is the mapping of the interior of USTs as part of DOE's waste characterization and remediation efforts and to obtain baseline data on the content of the storage tank interiors as well as data on changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Washington site, the TMS is designed to be a self-contained, compact, reconfigurable system that is capable of providing rapid, variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention.

  7. 46 CFR 197.206 - Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., procedures, or tests. (a) The Coast Guard may accept substitutes for equipment, materials, apparatus... particular equipment, material, apparatus, arrangement, procedure, or test is unreasonable or impracticable... 46 Shipping 7 2012-10-01 2012-10-01 false Substitutes for required equipment, materials,...

  8. 46 CFR 197.206 - Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., procedures, or tests. (a) The Coast Guard may accept substitutes for equipment, materials, apparatus... particular equipment, material, apparatus, arrangement, procedure, or test is unreasonable or impracticable... 46 Shipping 7 2014-10-01 2014-10-01 false Substitutes for required equipment, materials,...

  9. 46 CFR 197.206 - Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., procedures, or tests. (a) The Coast Guard may accept substitutes for equipment, materials, apparatus... particular equipment, material, apparatus, arrangement, procedure, or test is unreasonable or impracticable... 46 Shipping 7 2013-10-01 2013-10-01 false Substitutes for required equipment, materials,...

  10. Factory acceptance test results for the DIRSP projection optics

    NASA Astrophysics Data System (ADS)

    Thomas, Matthew C.; Ward, Craig S.

    2000-07-01

    The Factory Acceptance Test (FAT) results for the projection optical subsystem (POS) of US Army STIRCOM's dynamic infrared scene projector (DIRSP) are presented in this paper. DIRSP is a low background (-35 degrees Celsius) hardware-in-the- loop (HWIL), long-wave infrared (LWIR) scene projector built by Mission Research Corporation (MRC) for use by the Redstone Technical Test Center (RTTC). It has an effective emitter array size of 1632 X 672 suspended-membrane micro-resistor elements. The POS is responsible for generating this effective array size from three smaller arrays using a mosaic image combiner, adding background light from an external blackbody, and collimating the combined radiation with a 5:1 vacuum enclosed -35 degree Celsius zoom lens. The FAT results reported demonstrate good POS performance compared to the design for focal length, F/#, MTF and apparent temperature.

  11. 78 FR 53483 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... COMMISSION Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and..., tests, and analyses have been successfully completed, and that the specified acceptance criteria are...

  12. 78 FR 53484 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... COMMISSION Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and..., tests, and analyses have been successfully completed, and that the specified acceptance criteria are...

  13. Test Operations Procedure (TOP) 5-2-521 Pyrotechnic Shock Test Procedures

    DTIC Science & Technology

    2007-11-20

    Resonant Fixtures Missile Ordnance Pyroshock Shock Response Spectrum Flight Safety Components 16. SECURITY CLASSIFICATION OF: B. ABSTRACT...is to establish guidelines and procedures such that pyrotechnic shock (hereafter known as pyroshock ) testing can be performed in a uniform manner and... pyroshock testing. 1.3 Limitations. a. This TOP can only provide an overview of far field pyroshock testing procedures. Specific test items and or

  14. The Cloze Procedure as a Reading Test.

    ERIC Educational Resources Information Center

    Sadden, Leah Jane; Reid, Janet

    1985-01-01

    Reports on a study of the use of cloze passages in a developmental reading assessment program. The cloze procedure provides students with opportunities to practice their improved reading skills, while affording complete student-as-reader profiles. Concedes the value of standardized tests in determining student readiness to exit developmental…

  15. Test Security Procedures for Nevada Proficiency Examinations.

    ERIC Educational Resources Information Center

    Nevada State Dept. of Education, Carson City.

    Nevada statutes and administrative regulations specifically prohibit the disclosure of the content of examinations used in the Nevada Proficiency Examination Program. This document focuses on procedures to insure examination security. The state's test security requirements are outlined. Other sections deal with access to and copying of examination…

  16. 75 FR 34653 - Engine-Testing Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 1065 Engine-Testing Procedures CFR Correction In Title 40 of the Code of Federal Regulations, Part 1000 to End, revised as of July 1, 2009, on page 587, in Sec. 1065.340, reinstate...

  17. Infant test/procedure preparation (image)

    MedlinePlus

    During any infant test or procedure a child will be more comforted if a parent is able to be present, although the child will probably still show anxiety and cry. A child may also find comfort in a favorite toy or blanket.

  18. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... commercial clothes washers. Energy Conservation Standards...

  19. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... commercial clothes washers. Energy Conservation Standards...

  20. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... commercial clothes washers. Energy Conservation Standards...

  1. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... commercial clothes washers. Energy Conservation Standards...

  2. General Mission Analysis Tool (GMAT) Acceptance Test Plan [Draft

    NASA Technical Reports Server (NTRS)

    Dove, Edwin; Hughes, Steve

    2007-01-01

    The information presented in this Acceptance Test Plan document shows the current status of the General Mission Analysis Tool (GMAT). GMAT is a software system developed by NASA Goddard Space Flight Center (GSFC) in collaboration with the private sector. The GMAT development team continuously performs acceptance tests in order to verify that the software continues to operate properly after updates are made. The GMAT Development team consists of NASA/GSFC Code 583 software developers, NASA/GSFC Code 595 analysts, and contractors of varying professions. GMAT was developed to provide a development approach that maintains involvement from the private sector and academia, encourages collaborative funding from multiple government agencies and the private sector, and promotes the transfer of technology from government funded research to the private sector. GMAT contains many capabilities, such as integrated formation flying modeling and MATLAB compatibility. The propagation capabilities in GMAT allow for fully coupled dynamics modeling of multiple spacecraft, in any flight regime. Other capabilities in GMAT inclucle: user definable coordinate systems, 3-D graphics in any coordinate system GMAT can calculate, 2-D plots, branch commands, solvers, optimizers, GMAT functions, planetary ephemeris sources including DE405, DE200, SLP and analytic models, script events, impulsive and finite maneuver models, and many more. GMAT runs on Windows, Mac, and Linux platforms. Both the Graphical User Interface (GUI) and the GMAT engine were built and tested on all of the mentioned platforms. GMAT was designed for intuitive use from both the GUI and with an importable script language similar to that of MATLAB.

  3. Type of Speech Material Affects Acceptable Noise Level Test Outcome

    PubMed Central

    Koch, Xaver; Dingemanse, Gertjan; Goedegebure, André; Janse, Esther

    2016-01-01

    The acceptable noise level (ANL) test, in which individuals indicate what level of noise they are willing to put up with while following speech, has been used to guide hearing aid fitting decisions and has been found to relate to prospective hearing aid use. Unlike objective measures of speech perception ability, ANL outcome is not related to individual hearing loss or age, but rather reflects an individual’s inherent acceptance of competing noise while listening to speech. As such, the measure may predict aspects of hearing aid success. Crucially, however, recent studies have questioned its repeatability (test–retest reliability). The first question for this study was whether the inconsistent results regarding the repeatability of the ANL test may be due to differences in speech material types used in previous studies. Second, it is unclear whether meaningfulness and semantic coherence of the speech modify ANL outcome. To investigate these questions, we compared ANLs obtained with three types of materials: the International Speech Test Signal (ISTS), which is non-meaningful and semantically non-coherent by definition, passages consisting of concatenated meaningful standard audiology sentences, and longer fragments taken from conversational speech. We included conversational speech as this type of speech material is most representative of everyday listening. Additionally, we investigated whether ANL outcomes, obtained with these three different speech materials, were associated with self-reported limitations due to hearing problems and listening effort in everyday life, as assessed by a questionnaire. ANL data were collected for 57 relatively good-hearing adult participants with an age range representative for hearing aid users. Results showed that meaningfulness, but not semantic coherence of the speech material affected ANL. Less noise was accepted for the non-meaningful ISTS signal than for the meaningful speech materials. ANL repeatability was comparable

  4. 40 CFR 600.111-08 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Test procedures. 600.111-08 Section... Emission Test Procedures § 600.111-08 Test procedures. This section describes test procedures for the FTP, highway fuel economy test (HFET), US06, SC03, and the cold temperature FTP tests. Perform...

  5. 40 CFR 600.111-08 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Test procedures. 600.111-08 Section... Model Year Automobiles-Test Procedures § 600.111-08 Test procedures. This section provides test procedures for the FTP, highway, US06, SC03, and the cold temperature FTP tests. Testing shall be...

  6. Solar panel acceptance testing using a pulsed solar simulator

    NASA Technical Reports Server (NTRS)

    Hershey, T. L.

    1977-01-01

    Utilizing specific parameters as area of an individual cell, number in series and parallel, and established coefficient of current and voltage temperature dependence, a solar array irradiated with one solar constant at AMO and at ambient temperature can be characterized by a current-voltage curve for different intensities, temperatures, and even different configurations. Calibration techniques include: uniformity in area, depth and time, absolute and transfer irradiance standards, dynamic and functional check out procedures. Typical data are given for individual cell (2x2 cm) to complete flat solar array (5x5 feet) with 2660 cells and on cylindrical test items with up to 10,000 cells. The time and energy saving of such testing techniques are emphasized.

  7. Public acceptance and real testing of a nuclear repository

    SciTech Connect

    Brotzen, O.

    1995-12-31

    A local referendum and national polls show predominant distrust of the current disposal concept for spent nuclear fuel in Sweden. Plain neglect of in-place testing and monitoring of repository performance may be a contributing factor. The long periods of time involved in safe disposal call for thorough study of the potential and limitations of accelerated tests. The variation in some time involved in safe disposal call for thorough study of the potential and limitations of accelerated tests. The variation in some rate-determining factors attainable in an open repository suggests that results may be obtained which after backfilling would need periods of time comparable to those required for decay of the most harmful, strongly sorbed radionuclides. Focus should be on the isolation and containment of radionuclides in the accessible nearfield, rather than on nuclide release and transport through the inaccessible farfield. Tentative approaches are outlined, regarding nearfield groundwater control and barrier performance, and the local geochemical record, for decisions before excavations start, before development of disposal areas in a repository, and before emplacement of spent fuel, and also for monitoring performance thereafter. All tests should provide input to a strict and public licensing procedure, which ensures that no phase in disposal can be seen as a point of no return endangering future generations.

  8. Rough handling tests. Final report on International Test Operations Procedure

    SciTech Connect

    Not Available

    1985-12-13

    This document provides test procedures to simulate the transportation of items carried as unsecured cargo in trucks, or on the person of Army personnel. Items include munitions, rifles, rockets, radios, and mortars. Vibration testing, airdrop capability, and airdrop capability of explosives are not covered in this ITOP. This ITOP provides guidance for testing the ability of military items to withstand the shocks encountered during transportation to or employment on the battlefield.

  9. Ultrasonic interface level analyzer shop test procedure

    SciTech Connect

    STAEHR, T.W.

    1999-05-24

    The Royce Instrument Corporation Model 2511 Interface Level Analyzer (URSILLA) system uses an ultrasonic ranging technique (SONAR) to measure sludge depths in holding tanks. Three URSILLA instrument assemblies provided by the W-151 project are planned to be used during mixer pump testing to provide data for determining sludge mobilization effectiveness of the mixer pumps and sludge settling rates. The purpose of this test is to provide a documented means of verifying that the functional components of the three URSILLA instruments operate properly. Successful completion of this Shop Test Procedure (STP) is a prerequisite for installation in the AZ-101 tank. The objective of the test is to verify the operation of the URSILLA instruments and to verify data collection using a stand alone software program.

  10. 118-B-1 excavation treatability test procedures

    SciTech Connect

    Frain, J.M.

    1994-08-01

    This treatability study has two purposes: to support development of the approach to be used for burial ground remediation, and to provide specific engineering information for the design of burial grounds receiving waste generated from the 100 Area removal actions. Data generated from this test will also provide performance and cost information necessary for detailed analysis of alternatives for burial ground remediation. Further details on the test requirements, milestones and data quality objectives are described in detail in the 118-B-1 Excavation Treatability Test Plan (DOE/RL-94-43). These working procedures are intended for use by field personnel to implement the requirements of the milestone. A copy of the detailed Test Plan will be kept on file at the on-site field support trailer, and will be available for review by field personnel.

  11. 49 CFR 232.505 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... acceptance tests; (3) Correct any safety deficiencies identified by FRA in the design of the equipment or in... measure or determine the success or failure of the tests. If acceptance is to be based on extrapolation of... 49 Transportation 4 2010-10-01 2010-10-01 false Pre-revenue service acceptance testing plan....

  12. 49 CFR 232.505 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... acceptance tests; (3) Correct any safety deficiencies identified by FRA in the design of the equipment or in... measure or determine the success or failure of the tests. If acceptance is to be based on extrapolation of... 49 Transportation 4 2011-10-01 2011-10-01 false Pre-revenue service acceptance testing plan....

  13. Overcoming Denial through the Group: A Test of Acceptance Theory.

    ERIC Educational Resources Information Center

    Rugel, Robert P.; Barry, Denise

    1990-01-01

    Found participants (N=28) in alcohol treatment groups showed decreases in denial of drinking problems and decreases in psychopathology following 12 weeks of group counseling. Determined greater self-acceptance was associated with experiencing acceptance by group and with greater decreases in denial; decreases in denial and psychopathology were…

  14. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 20 2013-07-01 2013-07-01 false Test procedures. 86.884-5 Section 86... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of...

  15. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Test procedures. 86.425-78 Section 86... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test procedures are found in subpart F. (b) The Administrator may prescribe emission test procedures for...

  16. 40 CFR 600.111-93 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Model Year Automobiles-Test Procedures § 600.111-93 Test procedures. (a) The test procedures to be followed for generation of the city fuel economy data are those prescribed in §§ 86.127 through 86.138 of....) (b) The test procedures to be followed for generation of the highway fuel economy data are...

  17. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Test procedures. 86.884-5 Section 86... Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of engines with...

  18. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Test procedures. 86.884-5 Section 86... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of...

  19. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Test procedures. 86.425-78 Section 86... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test procedures are found in subpart F. (b) The Administrator may prescribe emission test procedures for...

  20. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Test procedures. 86.425-78 Section 86... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test procedures are found in subpart F. (b) The Administrator may prescribe emission test procedures for...

  1. 40 CFR 86.608-98 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Test procedures. 86.608-98 Section 86... New Light-Duty Vehicles, Light-Duty Trucks, and Heavy-Duty Vehicles § 86.608-98 Test procedures. (a) The prescribed test procedures are the Federal Test Procedure, as described in subpart B of this...

  2. 40 CFR 86.608-98 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Test procedures. 86.608-98 Section 86... Auditing of New Light-Duty Vehicles, Light-Duty Trucks, and Heavy-Duty Vehicles § 86.608-98 Test procedures. (a) The prescribed test procedures are the Federal Test Procedure, as described in subpart B...

  3. Social trust, risk perceptions and public acceptance of recycled water: testing a social-psychological model.

    PubMed

    Ross, Victoria L; Fielding, Kelly S; Louis, Winnifred R

    2014-05-01

    Faced with a severe drought, the residents of the regional city of Toowoomba, in South East Queensland, Australia were asked to consider a potable wastewater reuse scheme to supplement drinking water supplies. As public risk perceptions and trust have been shown to be key factors in acceptance of potable reuse projects, this research developed and tested a social-psychological model of trust, risk perceptions and acceptance. Participants (N = 380) were surveyed a few weeks before a referendum was held in which residents voted against the controversial scheme. Analysis using structural equation modelling showed that the more community members perceived that the water authority used fair procedures (e.g., consulting with the community and providing accurate information), the greater their sense of shared identity with the water authority. Shared social identity in turn influenced trust via increased source credibility, that is, perceptions that the water authority is competent and has the community's interest at heart. The findings also support past research showing that higher levels of trust in the water authority were associated with lower perceptions of risk, which in turn were associated with higher levels of acceptance, and vice versa. The findings have a practical application for improving public acceptance of potable recycled water schemes.

  4. In situ vitrification large-scale operational acceptance test analysis

    SciTech Connect

    Buelt, J.L.; Carter, J.G.

    1986-05-01

    A thermal treatment process is currently under study to provide possible enhancement of in-place stabilization of transuranic and chemically contaminated soil sites. The process is known as in situ vitrification (ISV). In situ vitrification is a remedial action process that destroys solid and liquid organic contaminants and incorporates radionuclides into a glass-like material that renders contaminants substantially less mobile and less likely to impact the environment. A large-scale operational acceptance test (LSOAT) was recently completed in which more than 180 t of vitrified soil were produced in each of three adjacent settings. The LSOAT demonstrated that the process conforms to the functional design criteria necessary for the large-scale radioactive test (LSRT) to be conducted following verification of the performance capabilities of the process. The energy requirements and vitrified block size, shape, and mass are sufficiently equivalent to those predicted by the ISV mathematical model to confirm its usefulness as a predictive tool. The LSOAT demonstrated an electrode replacement technique, which can be used if an electrode fails, and techniques have been identified to minimize air oxidation, thereby extending electrode life. A statistical analysis was employed during the LSOAT to identify graphite collars and an insulative surface as successful cold cap subsidence techniques. The LSOAT also showed that even under worst-case conditions, the off-gas system exceeds the flow requirements necessary to maintain a negative pressure on the hood covering the area being vitrified. The retention of simulated radionuclides and chemicals in the soil and off-gas system exceeds requirements so that projected emissions are one to two orders of magnitude below the maximum permissible concentrations of contaminants at the stack.

  5. Comparison of acceptance, preference and efficacy between pressure anesthesia and classical needle infiltration anesthesia for dental restorative procedures in adult patients

    PubMed Central

    Makade, Chetana Sachin; Shenoi, Pratima R; Gunwal, Mohit K

    2014-01-01

    Introduction: Intraoral local anesthesia is essential for delivering dental care. Needless devices have been developed to provide anesthesia without injections. Little controlled research is available on its use in dental restorative procedures in adult patients. The aims of this study were to compare adult patients acceptability and preference for needleless jet injection with classical local infiltration as well as to evaluate the efficacy of the needleless anesthesia. Materials and Methods: Twenty non fearful adults with no previous experience of dental anesthesia were studied using split-mouth design. The first procedure was performed with classical needle infiltration anesthesia. The same amount of anesthetic solution was administered using MADA jet needleless device in a second session one week later, during which a second dental restorative procedure was performed. Patients acceptance was assessed using Universal pain assessment tool while effectiveness was recorded using soft tissue anesthesia and pulpal anesthesia. Patients reported their preference for the anesthetic method at the third visit. The data was evaluated using chi square test and student's t-test. Results: Pressure anesthesia was more accepted and preferred by 70% of the patients than traditional needle anesthesia (20%). Both needle and pressure anesthesia was equally effective for carrying out the dental procedures. Conclusion: Patients experienced significantly less pain and fear (p<0.01) during anesthetic procedure with pressure anesthesia. However, for more invasive procedures needle anesthesia will be more effective. PMID:24778516

  6. Test Procedures for Toll Call Certification Alternatives.

    DTIC Science & Technology

    1987-04-07

    REPORT 4 PERIOD COVERED (U) Test Procedures for Toll CallFia Se86-Ar7 Certification AlternativesFiaSe86-Ar7 6. PERFORMING ORG . REPORT NUMBER 1. AUTHOR(e...toll call sampling is to use the toll call 21 a a C3a En L~a cmaL-a Lna ac C3 a cc u _3 to a- aa aL 4r C14 I Lo a_ V ’ Iara a D r- w U 4 c * a I’ aDUJ

  7. Evaluation of transplantation procedures acceptance among students of Thai, American, and Polish origin who finished a basic didactic course.

    PubMed

    Caban, A; Ziaja, J; Budziński, G; Król, R; Oczkowicz, G; Wystrychowski, W; Mąka, B; Badura, J; Cierniak, T; Cierpka, L

    2011-10-01

    The aim of this paper was to compare acceptance of basic transplantation procedures as displayed among students from Poland, Thailand, and the United States who finished their education in our clinic. The research concerned a group of 110 fifth year students of the medical department, including 42 citizens of Poland (group 1), 41 citizens of Thailand (group 2), and 27 citizens of the United States (group 3). The average age of the respondents was 25.4 years and 58% were women. After completing a number of clinical transplantation classes, we performed an anonymous poll that consisted of 12 questions related to attitudes toward organ donation and transplantation from dead of living donors. Chi-square tests were used to analyze the relationship between expressed opinions and demographic data. The majority of students accepted organ donation from either dead (92% "definitely yes") or living (81%) donors. The smallest percentage (58%) was expressed by group 2. Some insignificant differences were also observed in connection with the question of whether "brain death" is equivalent to death of a person. Students' responses were diverged with regard to consideration of implied consent as a factor to condition organ procurement from dead donors. Amid Thai students, acceptance was definitely lower (23%) than Polish (67%) or American (58%) ones. At the same time, organ donation was mostly dependent on the consent of a deceased person's family. Similar to other groups, the great majority of students declared their consent to both organ procurement after their own death, to donating a kidney to their relatives, or to persons with whom they are emotionally connected. Interestingly, 16% accepted organ donation for money.

  8. Chain Sampling as Used in Armor Acceptance Testing

    DTIC Science & Technology

    1989-09-01

    excessive (attribute), or he may measure the time in milk before the cereal becomes soggy (variable). Sampling by attributes is a dichotomous situation...introduces a new pre-sweetened breakfast cereal , they spend millions of dollars in advertisement costs with the hope that the consumer will sample it. Here...the consumer con- siders the entire supply of this new cereal as a single manufactured lot, to be accepted or rejected. Product acceptance, in this

  9. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Weld toughness test acceptance criteria. 54.05-17... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in...

  10. Acceptance Performance Test Guideline for Utility Scale Parabolic Trough and Other CSP Solar Thermal Systems: Preprint

    SciTech Connect

    Mehos, M. S.; Wagner, M. J.; Kearney, D. W.

    2011-08-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. Progress on interim guidelines was presented at SolarPACES 2010. Significant additions and modifications were made to the guidelines since that time, resulting in a final report published by NREL in April 2011. This paper summarizes those changes, which emphasize criteria for assuring thermal equilibrium and steady state conditions within the solar field.

  11. Utility-Scale Parabolic Trough Solar Systems: Performance Acceptance Test Guidelines, April 2009 - December 2010

    SciTech Connect

    Kearney, D.

    2011-05-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The Guidelines contained here are specifically written for parabolic trough collector systems with a heat-transport system using a high-temperature synthetic oil, but the basic principles are relevant to other CSP systems.

  12. 76 FR 27016 - Evaluating Test Procedures for Voting Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... National Institute of Standards and Technology Evaluating Test Procedures for Voting Systems AGENCY... assess NIST's test procedures for voting equipment. Manufacturers interested in participating in this... for certification) by the Election Assistance Commission to develop and assess NIST test protocols...

  13. 40 CFR 60.374 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Battery Manufacturing Plants § 60.374 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods...

  14. 40 CFR 60.374 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Battery Manufacturing Plants § 60.374 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods...

  15. The Careful Puppet Master: Reducing risk and fortifying acceptance testing with Jenkins CI

    NASA Astrophysics Data System (ADS)

    Smith, Jason A.; Richman, Gabriel; DeStefano, John; Pryor, James; Rao, Tejas; Strecker-Kellogg, William; Wong, Tony

    2015-12-01

    Centralized configuration management, including the use of automation tools such as Puppet, can greatly increase provisioning speed and efficiency when configuring new systems or making changes to existing systems, reduce duplication of work, and improve automated processes. However, centralized management also brings with it a level of inherent risk: a single change in just one file can quickly be pushed out to thousands of computers and, if that change is not properly and thoroughly tested and contains an error, could result in catastrophic damage to many services, potentially bringing an entire computer facility offline. Change management procedures can—and should—be formalized in order to prevent such accidents. However, like the configuration management process itself, if such procedures are not automated, they can be difficult to enforce strictly. Therefore, to reduce the risk of merging potentially harmful changes into our production Puppet environment, we have created an automated testing system, which includes the Jenkins CI tool, to manage our Puppet testing process. This system includes the proposed changes and runs Puppet on a pool of dozens of RedHat Enterprise Virtualization (RHEV) virtual machines (VMs) that replicate most of our important production services for the purpose of testing. This paper describes our automated test system and how it hooks into our production approval process for automatic acceptance testing. All pending changes that have been pushed to production must pass this validation process before they can be approved and merged into production.

  16. Project W-314 acceptance test report HNF-4651 for HNF-4650 SN-268 encasement leak detection ANA-WT-LDSTA-335 for project W-314

    SciTech Connect

    HAMMERS, J.S.

    1999-09-30

    The purpose of the test was to verify that the AN Tank Farm Encasement Leak Detector components are functionally integrated and operate in accordance with engineering design specifications The Acceptance Test Procedure HNF-4650, SN-268 Encasement Leak Detection ANA-W-LDSTA-335, was conducted between 22 June and 01 July 1999 at the 200E AN Tank Farm. The test has been completed with no open test exceptions The test was conducted prior to final engineering ''as built'' activities being completed this had no impact on the procedure or test results. All components, identified in the procedure, were found to be labeled and identified as written in the procedure.

  17. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the test must be properly repaired. (g) Pressure test. Any tank that fails to meet the acceptance... 49 Transportation 2 2010-10-01 2010-10-01 false Acceptable results of tests and inspections. 180... results of tests and inspections. (a) Corroded or abraded areas. The minimum thickness may not be...

  18. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the test must be properly repaired. (g) Pressure test. Any tank that fails to meet the acceptance... 49 Transportation 3 2011-10-01 2011-10-01 false Acceptable results of tests and inspections. 180... results of tests and inspections. (a) Corroded or abraded areas. The minimum thickness may not be...

  19. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the test must be properly repaired. (g) Pressure test. Any tank that fails to meet the acceptance... 49 Transportation 3 2012-10-01 2012-10-01 false Acceptable results of tests and inspections. 180... results of tests and inspections. (a) Corroded or abraded areas. The minimum thickness may not be...

  20. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the test must be properly repaired. (g) Pressure test. Any tank that fails to meet the acceptance... 49 Transportation 3 2013-10-01 2013-10-01 false Acceptable results of tests and inspections. 180... results of tests and inspections. (a) Corroded or abraded areas. The minimum thickness may not be...

  1. 49 CFR 180.511 - Acceptable results of inspections and tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... acceptance criteria. (f) Leakage pressure test. A tank car successfully passes the leakage pressure test when... 49 Transportation 3 2011-10-01 2011-10-01 false Acceptable results of inspections and tests. 180... results of inspections and tests. Provided it conforms with other applicable requirements of...

  2. 49 CFR 180.411 - Acceptable results of tests and inspections.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the test must be properly repaired. (g) Pressure test. Any tank that fails to meet the acceptance... 49 Transportation 3 2014-10-01 2014-10-01 false Acceptable results of tests and inspections. 180... results of tests and inspections. (a) Corroded or abraded areas. The minimum thickness may not be...

  3. 40 CFR 1066.840 - Highway fuel economy test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Highway fuel economy test procedure... Highway fuel economy test procedure. This section describes the procedure for the highway fuel economy test (HFET). This test involves emission sampling and fuel economy measurement for certain vehicles...

  4. 40 CFR 60.154 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.154... Plants § 60.154 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  5. 40 CFR 60.176 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.176... Smelters § 60.176 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  6. 40 CFR 60.166 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.166... Smelters § 60.166 Test methods and procedures. (a) In conducting performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  7. 40 CFR 60.154 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Test methods and procedures. 60.154... Plants § 60.154 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  8. 40 CFR 60.176 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.176... Smelters § 60.176 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  9. 40 CFR 60.166 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.166... Smelters § 60.166 Test methods and procedures. (a) In conducting performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  10. 40 CFR 60.154 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.154... Plants § 60.154 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  11. 40 CFR 60.154 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.154... Plants § 60.154 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  12. 40 CFR 60.186 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.186... Smelters § 60.186 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  13. 40 CFR 60.54 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.54... § 60.54 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  14. 40 CFR 60.186 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.186... Smelters § 60.186 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  15. 40 CFR 60.186 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.186... Smelters § 60.186 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  16. 40 CFR 60.54 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.54... § 60.54 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  17. Laboratory procedures for waste form testing

    SciTech Connect

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  18. Proposed acceptance, qualification, and characterization tests for thin-film PV modules

    NASA Technical Reports Server (NTRS)

    Waddington, D.; Mrig, L.; Deblasio, R.; Ross, R.

    1988-01-01

    Details of a proposed test program for PV thin-film modules which the Department of Energy has directed the Solar Energy Research Institute (SERI) to prepare are presented. Results of one of the characterization tests that SERI has performed are also presented. The objective is to establish a common approach to testing modules that will be acceptable to both users and manufacturers. The tests include acceptance, qualification, and characterization tests. Acceptance tests verify that randomly selected modules have similar characteristics. Qualification tests are based on accelerated test methods designed to simulate adverse conditions. Characterization tests provide data on performance in a predefined environment.

  19. An improved Hochberg procedure for multiple tests of significance.

    PubMed

    Rom, Dror M

    2013-02-01

    We propose a simple modification of Hochberg's step-up Bonferroni procedure for multiple tests of significance. The proposed procedure is always more powerful than Hochberg's procedure for more than two tests, and is more powerful than Hommel's procedure for three and four tests. A numerical analysis of the new procedure indicates that its Type I error is controlled under independence of the test statistics, at a level equal to or just below the nominal Type I error. Examination of various non-null configurations of hypotheses shows that the modified procedure has a power advantage over Hochberg's procedure which increases in relationship to the number of false hypotheses.

  20. Baseline testing procedures for PV modules beyond the qualification testing

    NASA Astrophysics Data System (ADS)

    Schneller, Eric; Shiradkar, Narendra S.; Dhere, Neelkanth G.

    2013-09-01

    The qualification tests described in IEC 61215 for the c-Si PV modules are essentially pass/fail tests that assist in avoiding infant mortality. This paper reports on the baseline test procedure carried out on PV modules at Florida Solar Energy Center that go beyond the pass/fail criteria of the qualification tests and obtain information about the degradation modes and mechanisms. The importance and limitations of the various characterization techniques are described. Electroluminescence imaging has been used to detect and categorize the faults at the cell level. Indoor infrared imaging has been used to study the quality of electrical interconnects in the module. The infrared imaging carried out on the modules while they are undergoing outdoor exposure has provided information about the presence and distribution of hot spots in these modules. Conventionally, the insulation resistance tester has been used mostly for the dry and wet leakage test. In this study, the importance of the polarization index test and voltage excursion test are described. The use of these tests is essential to provide insight into the modes and mechanisms of degradation, during reliability and durability studies of PV modules. A predictive model for the service life of a PV module may be developed through the results obtained from these characterization techniques in conjunction with long-term exposure and accelerated lifetime tests.

  1. W-026 acceptance test plan plant control system software (submittal {number_sign} 216)

    SciTech Connect

    Watson, T.L., Fluor Daniel Hanford

    1997-02-14

    Acceptance Testing of the WRAP 1 Plant Control System software will be conducted throughout the construction of WRAP 1 with final testing on the glovebox software being completed in December 1996. The software tests will be broken out into five sections; one for each of the four Local Control Units and one for the supervisory software modules. The acceptance test report will contain completed copies of the software tests along with the applicable test log and completed Exception Test Reports.

  2. 40 CFR 89.508 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... procedure as adopted in the California Regulations for New 1996 and Later Heavy-Duty Off-Road Diesel Cycle... exhaust emission standard (or applicable FEL) for oxides of nitrogen. If alternate procedures were used...

  3. 40 CFR 89.508 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... procedure as adopted in the California Regulations for New 1996 and Later Heavy-Duty Off-Road Diesel Cycle... exhaust emission standard (or applicable FEL) for oxides of nitrogen. If alternate procedures were used...

  4. 40 CFR 89.508 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... procedure as adopted in the California Regulations for New 1996 and Later Heavy-Duty Off-Road Diesel Cycle... exhaust emission standard (or applicable FEL) for oxides of nitrogen. If alternate procedures were used...

  5. Flight test pilot evaluation of a delayed flap approach procedure

    NASA Technical Reports Server (NTRS)

    Bull, J. S.; Edwards, F. G.; Foster, J. D.; Hegarty, D. M.; Drinkwater, F. J., III

    1977-01-01

    Using NASA's CV-990 aircraft, a delayed flap approach procedure was demonstrated to nine guest pilots from the air transport industry. Four demonstration flights and 37 approaches were conducted under VFR weather conditions. A limited pilot evaluation of the delayed flap procedure was obtained from pilot comments and from questionaires they completed. Pilot acceptability, pilot workload, and ATC compatibility were quantitatively rated. The delayed flap procedure was shown to be feasible, and suggestions for further development work were obtained.

  6. Antimicrobial Testing Methods & Procedures Developed by EPA's Microbiology Laboratory

    EPA Pesticide Factsheets

    We develop antimicrobial testing methods and standard operating procedures to measure the effectiveness of hard surface disinfectants against a variety of microorganisms. Find methods and procedures for antimicrobial testing.

  7. 40 CFR 60.303 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.303... be used to determine the ventilation volumetric flow rate. (3) Method 9 and the procedures in § 60.11... § 60.303 Test methods and procedures. (a) In conducting the performance tests required in § 60.8,...

  8. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 30 2013-07-01 2012-07-01 true Test procedures for measurement. 401.13... AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures for measurement which are prescribed at part 136 of this chapter shall apply to expressions of pollutant...

  9. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 29 2014-07-01 2012-07-01 true Test procedures for measurement. 401.13... AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures for measurement which are prescribed at part 136 of this chapter shall apply to expressions of pollutant...

  10. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 30 2012-07-01 2012-07-01 false Test procedures for measurement. 401.13 Section 401.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures...

  11. 40 CFR 133.104 - Sampling and test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Sampling and test procedures. 133.104 Section 133.104 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS SECONDARY TREATMENT REGULATION § 133.104 Sampling and test procedures. (a) Sampling and test procedures...

  12. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Test procedures for measurement. 401.13 Section 401.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures...

  13. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 29 2011-07-01 2009-07-01 true Test procedures for measurement. 401.13 Section 401.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures...

  14. 21 CFR 1010.13 - Special test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) RADIOLOGICAL HEALTH PERFORMANCE STANDARDS FOR ELECTRONIC PRODUCTS: GENERAL Alternate Test Procedures § 1010.13 Special test procedures. The Director, Center for Devices and Radiological Health, may, on the basis of a... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Special test procedures. 1010.13 Section...

  15. 21 CFR 1010.13 - Special test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) RADIOLOGICAL HEALTH PERFORMANCE STANDARDS FOR ELECTRONIC PRODUCTS: GENERAL Alternate Test Procedures § 1010.13 Special test procedures. The Director, Center for Devices and Radiological Health, may, on the basis of a... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Special test procedures. 1010.13 Section...

  16. 46 CFR 164.009-15 - Test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Test procedure. 164.009-15 Section 164.009-15 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Noncombustible Materials for Merchant Vessels § 164.009-15 Test procedure. (a) General. Paragraphs (b) through (k) of this section contain the test procedures for each...

  17. 46 CFR 164.009-15 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Test procedure. 164.009-15 Section 164.009-15 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Noncombustible Materials for Merchant Vessels § 164.009-15 Test procedure. (a) General. Paragraphs (b) through (k) of this section contain the test procedures for each...

  18. 40 CFR 136.3 - Identification of test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Identification of test procedures. 136.3 Section 136.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) GUIDELINES ESTABLISHING TEST PROCEDURES FOR THE ANALYSIS OF POLLUTANTS § 136.3 Identification of test procedures. (a) Parameters...

  19. 40 CFR 136.3 - Identification of test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Identification of test procedures. 136.3 Section 136.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) GUIDELINES ESTABLISHING TEST PROCEDURES FOR THE ANALYSIS OF POLLUTANTS § 136.3 Identification of test procedures. (a) Parameters...

  20. 40 CFR 136.3 - Identification of test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Identification of test procedures. 136.3 Section 136.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) GUIDELINES ESTABLISHING TEST PROCEDURES FOR THE ANALYSIS OF POLLUTANTS § 136.3 Identification of test procedures. (a) Parameters...

  1. 40 CFR 136.3 - Identification of test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Identification of test procedures. 136.3 Section 136.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) GUIDELINES ESTABLISHING TEST PROCEDURES FOR THE ANALYSIS OF POLLUTANTS § 136.3 Identification of test procedures. (a) Parameters...

  2. 40 CFR 136.3 - Identification of test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Identification of test procedures. 136.3 Section 136.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) GUIDELINES ESTABLISHING TEST PROCEDURES FOR THE ANALYSIS OF POLLUTANTS § 136.3 Identification of test procedures. (a) Parameters...

  3. 40 CFR 87.62 - Test procedure (propulsion engines).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Test procedure (propulsion engines... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM AIRCRAFT AND AIRCRAFT ENGINES Test Procedures for Engine Exhaust Gaseous Emissions (Aircraft and Aircraft Gas Turbine Engines) § 87.62 Test procedure...

  4. 40 CFR 86.527-90 - Test procedures, overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Test procedures, overview. 86.527-90 Section 86.527-90 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... 1978 and Later New Motorcycles; Test Procedures § 86.527-90 Test procedures, overview. (a)...

  5. 40 CFR 86.527-90 - Test procedures, overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Test procedures, overview. 86.527-90 Section 86.527-90 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... 1978 and Later New Motorcycles; Test Procedures § 86.527-90 Test procedures, overview. (a)...

  6. 40 CFR 86.227-94 - Test procedures; overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Test procedures; overview. 86.227-94 Section 86.227-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...-Duty Passenger Vehicles; Cold Temperature Test Procedures § 86.227-94 Test procedures; overview....

  7. 40 CFR 86.227-94 - Test procedures; overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Test procedures; overview. 86.227-94 Section 86.227-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...-Duty Passenger Vehicles; Cold Temperature Test Procedures § 86.227-94 Test procedures; overview....

  8. 40 CFR 600.111-80 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Model Year Automobiles-Test Procedures § 600.111-80 Test procedures. (a) The test procedures to be followed for generation of the city fuel economy data are those prescribed in §§ 86.127-94 through 86.138... followed for generation of the highway fuel economy data are those specified in § 600.111-78 (b) through...

  9. 40 CFR 60.534 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.534 Section 60.534 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Wood Heaters § 60.534 Test methods and procedures. Test methods and procedures in appendix A of...

  10. 40 CFR 60.534 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Test methods and procedures. 60.534 Section 60.534 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Wood Heaters § 60.534 Test methods and procedures. Test methods and procedures in appendix A of...

  11. 40 CFR 60.534 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Test methods and procedures. 60.534 Section 60.534 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Wood Heaters § 60.534 Test methods and procedures. Test methods and procedures in appendix A of...

  12. 40 CFR 60.534 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.534 Section 60.534 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Wood Heaters § 60.534 Test methods and procedures. Test methods and procedures in appendix A of...

  13. 40 CFR 60.534 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.534 Section 60.534 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Wood Heaters § 60.534 Test methods and procedures. Test methods and procedures in appendix A of...

  14. 40 CFR 87.62 - Test procedure (propulsion engines).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Test procedure (propulsion engines). 87.62 Section 87.62 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) Definitions. Test Procedures § 87.62 Test procedure (propulsion engines). Link to...

  15. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures..., or eliminating smoke emissions and to uncontrolled engines. (b) The test is designed to determine the opacity of smoke in exhaust emissions during those engine operating conditions which tend to promote...

  16. 46 CFR 130.480 - Test procedure and operations manual.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Test procedure and operations manual. 130.480 Section....480 Test procedure and operations manual. (a) A procedure for tests to be conducted on automated... detailed operations manual that describes the operation and indicates the location of each system...

  17. 40 CFR 133.104 - Sampling and test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Sampling and test procedures. 133.104 Section 133.104 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS SECONDARY TREATMENT REGULATION § 133.104 Sampling and test procedures. (a) Sampling and test procedures...

  18. SU-E-P-46: Clinical Acceptance Testing and Implementation of a Portable CT Unit

    SciTech Connect

    LaFrance, M; Marsh, S; Hicks, R; O’Donnell-Moran, G

    2015-06-15

    Purpose: Planning for the first installation in New England of a new portable CT unit to be used in the Operating Room required the integration of many departments including Surgery, Neurosurgery, Information Services, Clinical Engineering, Radiology and Medical Physics/Radiation Safety. Acceptance testing and the quality assurance procedures were designed to optimize image quality and patient and personnel radiation exposure. Methods: The vendor’s protocols were tested using the CT Dosimetry phantoms. The system displayed the CTDIw instead of the CTDIvol while testing the unit. Radiation exposure was compared to existing CT scanners from installed CT units throughout the facility. Brainlab measures all 4 periphery slots on the CT Dosimetry phantom. The ACR measures only the superior slot for the periphery measurement. A comprehensive radiation survey was also performed for several locations. Results: The CTDIvol measurements were comparable for the following studies: brain, C-Spine, and sinuses. However, the mobile CT measurements were slightly higher than other CT units but within acceptable tolerance if measured using the ACR method.Based on scatter measurements, it was determined if any personnel were to stay in the OR Suite during image acquisition that the appropriate lead apron and thyroid shields had to be worn.In addition, to reduce unnecessary scatter, there were two mobile 6 foot wide shields (1/16″ lead equivalent) available to protect personnel in the room and adjacent areas. Conclusion: Intraoperative CT provides the physician new opportunities for evaluation of the progression of surgical resections and device placement at the cost of increasing the amount of trained personnel required to perform this procedure. It also brings with it challenges to keep the radiation exposure to the patients and staff within reasonable limits.

  19. 32 CFR 634.35 - Chemical testing policies and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Chemical testing policies and procedures. 634.35... Chemical testing policies and procedures. (a) Validity of chemical testing. Results of chemical testing are... that conform to the Model Specification for Evidential Breath Testing Devices (58 FR 48705),...

  20. W-026, acceptance test report box non-destructive examination system (submittal {number_sign}046.2) 5368

    SciTech Connect

    Watson, T.L.

    1997-01-07

    The Waste Receiving and Processing Facility, Module 1 (WRAP 1) Box Non- Destructive Examination (NDE) System is designed to use x-ray technology to safely examine boxes containing radioactive and mixed waste. It is designed to meet the requirements of the Code of Federal Regulations, the Washington Administrative Code, and the American National Standards Institute. This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the WRAP- 1 Box NDE System will function as intended by the Integrated Construction Forces Kaiser Engineers Hanford Company (ICF KH) procurement requisition KEH- 5368. This document is prepared in compliance with Section 13533 and Appendix A of the W-026 Construction Specification. The test results will be issued as an Acceptance Test Report (ATR) after all testing is complete. The test will be performed in WRAP 1.

  1. End User Acceptance - Requirements or Specifications, Certification, Testing

    NASA Technical Reports Server (NTRS)

    Jeevarajan, Judith

    2013-01-01

    NASA follows top level safety requirement of two-failure tolerance (t hree levels of controls or design for minimum risk) to all catastroph ic hazards in the design of safe li-ion batteries for space use. ? R igorous development testing at appropriate levels to credible offnominal conditions and review of test data. ? Implement robust design con trols based on test results and test again to confirm safety at the a ppropriate levels. ? Stringent testing of all (100%) flight batteries (from button cells to large batteries).

  2. Testing the acceptability of liquid fish oil in older adults.

    PubMed

    Yaxley, Alison; Miller, Michelle D; Fraser, Robert J; Cobiac, Lynne; Crotty, Maria

    2011-01-01

    Inflammatory conditions likely to benefit from fish oil therapy are prevalent in older adults however acceptability in this group is uncertain. This study aimed to assess the palatability of a range of liquid fish oil concentrations, the frequency and extent of side effects, and to summarise any effects on adherence to fish oil therapy in older adults. One hundred patients (>=60 years) completed a randomised, single-blind palatability study, conducted in two parts. In part one, 50 subjects, blinded to random sample order, consumed multiple liquid fish oil samples (2x10%, 40% and 100%). In part two, 50 subjects tasted one concentration, or 100% extra light olive oil (control). Pleasantness of taste was scored on a 5-point Likert scale. Side effects were recorded 24-hr post-tasting. Results of part one showed that 9/50 participants reported increasingly unpleasant taste with increasing fish oil concentration. 14/50 reported unpleasant taste for 100% fish oil vs 7/50 for 10%. 14/50 reported side effects which would not affect compliance with therapy. For part two, 1/12 reported unpleasant taste for 100% vs 0/13 for 10% fish oil or control. 4/50 reported side effects and 2/4 indicated these would prevent ongoing fish oil therapy. The authors conclude that taste itself is not a deterrent to fish oil therapy. Furthermore, reported adverse effects may not be a true reaction to fish oil, or dissuade patients from compliance. Liquid fish oil supplements are acceptable to older adults, therefore should be investigated as a therapy for geriatric conditions.

  3. Formulation of a candidate glass for use as an acceptance test standard material

    SciTech Connect

    Ebert, W.L.; Strachan, D.M.; Wolf, S.F.

    1998-04-01

    In this report, the authors discuss the formulation of a glass that will be used in a laboratory testing program designed to measure the precision of test methods identified in the privatization contracts for the immobilization of Hanford low-activity wastes. Tests will be conducted with that glass to measure the reproducibility of tests and analyses that must be performed by glass producers as a part of the product acceptance procedure. Test results will be used to determine if the contractually required tests and analyses are adequate for evaluating the acceptability of likely immobilized low-activity waste (ILAW) products. They will also be used to evaluate if the glass designed for use in these tests can be used as an analytical standard test material for verifying results reported by vendors for tests withg ILAW products. The results of those tests and analyses will be presented in a separate report. The purpose of this report is to document the strategy used to formulate the glass to be used in the testing program. The low-activity waste reference glass LRM that will be used in the testing program was formulated to be compositionally similar to ILAW products to be made with wastes from Hanford. Since the ILAW product compositions have not been disclosed by the vendors participating in the Hanford privatization project, the composition of LRM was formulated based on simulated Hanford waste stream and amounts of added glass forming chemicals typical for vitrified waste forms. The major components are 54 mass % SiO{sub 2}, 20 mass % Na{sub 2}O, 10 mass % Al{sub 2}O{sub 3}, 8 mass % B{sub 2}O{sub 3}, and 1.5 mass % K{sub 2}O. Small amounts of other chemicals not present in Hanford wastes were also included in the glass, since they may be included as chemical additives in ILAW products. This was done so that the use of LRM as a composition standard could be evaluated. Radionuclides were not included in LRM because a nonradioactive material was desired.

  4. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... identification tests are conducted: (1) The average length/weight ratio of the thread in meters per kilogram... analysis, thermogravimetric analysis, differential scanning calorimeter, or other equivalent means...

  5. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... identification tests are conducted: (1) The average length/weight ratio of the thread in meters per kilogram... analysis, thermogravimetric analysis, differential scanning calorimeter, or other equivalent means...

  6. 46 CFR 197.206 - Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Substitutes for required equipment, materials, apparatus... Operations General § 197.206 Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests. (a) The Coast Guard may accept substitutes for equipment, materials,...

  7. 46 CFR 197.206 - Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Substitutes for required equipment, materials, apparatus... Operations General § 197.206 Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests. (a) The Coast Guard may accept substitutes for equipment, materials,...

  8. 40 CFR 136.4 - Application for alternate test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the alternate test procedure to the pollutant(s) or parameter(s) in waste water discharges from... procedures. 136.4 Section 136.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER... Region where the discharge occurs for approval of an alternative test procedure. (b) When the...

  9. 32 CFR 1904.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... acceptance of service of process. (a) Service of Process Upon the CIA or a CIA Employee in An Official..., personal service of process may be accepted only by attorneys of the Office of General Counsel at CIA..., Washington, DC 20505. (b) Service of Process Upon a CIA Employee Solely in An Individual Capacity—(1)...

  10. 40 CFR 60.503 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... level and shall end at the same reference point. The test shall include at least two startups and... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.503... Terminals § 60.503 Test methods and procedures. (a) In conducting the performance tests required in §...

  11. 14 CFR 61.43 - Practical tests: General procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Practical tests: General procedures. 61.43... Practical tests: General procedures. (a) Completion of the practical test for a certificate or rating... rating sought within the approved practical test standards; (2) Demonstrating mastery of the aircraft...

  12. 40 CFR Appendix B to Subpart S of... - Test Procedures

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Test Procedures B Appendix B to Subpart... Requirements Pt. 51, Subpt. S, App. B Appendix B to Subpart S of Part 51—Test Procedures (I) Idle test (a... begin 10 seconds after the applicable test mode begins. Exhaust gas concentrations shall be analyzed...

  13. 49 CFR 572.132 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.132 Section... Hybrid III 5th Percentile Female Test Dummy, Alpha Version § 572.132 Head assembly and test procedure. (a) The head assembly (refer to § 572.130(a)(1)(i)) for this test consists of the complete head...

  14. 49 CFR 572.172 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.172 Section... Hybrid III 10-Year-Old Child Test Dummy (HIII-10C) § 572.172 Head assembly and test procedure. (a) The head assembly for this test consists of the complete head (drawing 420-1000), a six-axis...

  15. 49 CFR 572.132 - Head assembly and test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Head assembly and test procedure. 572.132 Section... Hybrid III 5th Percentile Female Test Dummy, Alpha Version § 572.132 Head assembly and test procedure. (a) The head assembly (refer to § 572.130(a)(1)(i)) for this test consists of the complete head...

  16. 49 CFR 572.132 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.132 Section... Hybrid III 5th Percentile Female Test Dummy, Alpha Version § 572.132 Head assembly and test procedure. (a) The head assembly (refer to § 572.130(a)(1)(i)) for this test consists of the complete head...

  17. 49 CFR 572.172 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.172 Section... Hybrid III 10-Year-Old Child Test Dummy (HIII-10C) § 572.172 Head assembly and test procedure. (a) The head assembly for this test consists of the complete head (drawing 420-1000), a six-axis...

  18. 49 CFR 572.132 - Head assembly and test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Head assembly and test procedure. 572.132 Section... Hybrid III 5th Percentile Female Test Dummy, Alpha Version § 572.132 Head assembly and test procedure. (a) The head assembly (refer to § 572.130(a)(1)(i)) for this test consists of the complete head...

  19. School age test or procedure preparation

    MedlinePlus

    ... someone else who is helping with the procedure. Physical contact can help reduce pain and anxiety. Distract your child with books, bubbles, games, hand-held video games, or other activities. PLAY PREPARATION Children often ...

  20. CSI computer system/remote interface unit acceptance test results

    NASA Technical Reports Server (NTRS)

    Sparks, Dean W., Jr.

    1992-01-01

    The validation tests conducted on the Control/Structures Interaction (CSI) Computer System (CCS)/Remote Interface Unit (RIU) is discussed. The CCS/RIU consists of a commercially available, Langley Research Center (LaRC) programmed, space flight qualified computer and a flight data acquisition and filtering computer, developed at LaRC. The tests were performed in the Space Structures Research Laboratory (SSRL) and included open loop excitation, closed loop control, safing, RIU digital filtering, and RIU stand alone testing with the CSI Evolutionary Model (CEM) Phase-0 testbed. The test results indicated that the CCS/RIU system is comparable to ground based systems in performing real-time control-structure experiments.

  1. Resolve! Version 2.5: Flammable Gas Accident Analysis Tool Acceptance Test Plan and Test Results

    SciTech Connect

    LAVENDER, J.C.

    2000-10-17

    RESOLVE! Version 2 .5 is designed to quantify the risk and uncertainty of combustion accidents in double-shell tanks (DSTs) and single-shell tanks (SSTs). The purpose of the acceptance testing is to ensure that all of the options and features of the computer code run; to verify that the calculated results are consistent with each other; and to evaluate the effects of the changes to the parameter values on the frequency and consequence trends associated with flammable gas deflagrations or detonations.

  2. Redstone Test Stand Accepted Into National Register of Historical Places

    NASA Technical Reports Server (NTRS)

    1976-01-01

    On October 02, 1976, Marshall Space Flight Center's (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand along with their wives are (left to right), Madison County Commission Chairman James Record, Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, (holding certificate), Ed, Buckbee, Space and Rocket Center Director; Harvie Jones, Huntsville Architect; Dick Smith; and Joe Jones.

  3. 40 CFR 89.114 - Special and alternate test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... procedures in 40 CFR part 1065. For any EPA testing with Tier 2 or Tier 3 engines, EPA will use the..., manufacturers may elect to use the procedures specified in 40 CFR part 86, subpart N, as an alternate...

  4. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test..., production line testing and Selective Enforcement Audit testing, to any setting within the physically.... (1) Prior to performing exhaust emission production line testing, the manufacturer may accumulate...

  5. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test..., production line testing and Selective Enforcement Audit testing, to any setting within the physically.... (1) Prior to performing exhaust emission production line testing, the manufacturer may accumulate...

  6. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test..., production line testing and Selective Enforcement Audit testing, to any setting within the physically.... (1) Prior to performing exhaust emission production line testing, the manufacturer may accumulate...

  7. 75 FR 37310 - Engine-Testing Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... the entries for ``Hydrocarbon composition'' to read as follows: Sec. 1065.710 Gasoline... Units General testing testing \\1\\ * * * * * Hydrocarbon composition: Olefins m\\3\\/m\\3\\....... Maximum,...

  8. KSC 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT) Report

    NASA Technical Reports Server (NTRS)

    Barbre, Robert E.

    2015-01-01

    This report documents analysis results of the Kennedy Space Center updated 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT). This test was designed to demonstrate that the new DRWP operates in a similar manner to the previous DRWP for use as a situational awareness asset for mission operations at the Eastern Range to identify rapid changes in the wind environment that weather balloons cannot depict. Data examination and two analyses showed that the updated DRWP meets the specifications in the OAT test plan and performs at least as well as the previous DRWP. Data examination verified that the DRWP provides complete profiles every five minutes from 1.8-19.5 km in vertical increments of 150 m. Analysis of 5,426 wind component reports from 49 concurrent DRWP and balloon profiles presented root mean square (RMS) wind component differences around 2.0 m/s. The DRWP's effective vertical resolution (EVR) was found to be 300 m for both the westerly and southerly wind component, which the best EVR possible given the DRWP's vertical sampling interval. A third analysis quantified the sensitivity to rejecting data that do not have adequate signal by assessing the number of first-guess propagations at each altitude. This report documents the data, quality control procedures, methodology, and results of each analysis. It also shows that analysis of the updated DRWP produced results that were at least as good as the previous DRWP with proper rationale. The report recommends acceptance of the updated DRWP for situational awareness usage as per the OAT's intent.

  9. TDS and BMT for CASES ADF (ADF RAMS), acceptance test

    NASA Technical Reports Server (NTRS)

    Davis, Hugh W.

    1992-01-01

    The Controls, Astrophysics, and Structures Experiment (CASES) is a proposed experiment to collect x ray images of the galactic center and solar disk with unprecedented resolution. This requires precision pointing and suppression of vibrations in the long, flexible structure that comprises the 32-m x ray telescope optical bench. Two separate electro-optical sensors systems are provided for the ground test facility (GTF). The Boom Motion Tracker (BMT) measures eigenvector data for post-mission use in system identification. The Tip Displacement Sensor (TDS) measures boom tip position and is used as feedback for the closed-loop control system that stabilizes the boom. The deployment and testing of the BMT and TDS systems is summarized.

  10. Summary of Tray Pack Field Acceptance Tests and Results

    DTIC Science & Technology

    1988-05-01

    test was conducted during 18-22 September 1984 at Fort Bragg, Fayetteville, NC. Eighteen items were tested since Turkey/Gravy, Chocolate Cake and...5.27 [3] (7.14) 5.54 [3] (7.08) 6.52 A (6.78) Chocolate Cake 4.63 R (6.68) 4 4.83 R (7.46) Egg Loaf w/Cheese 2.95 R (4.82) 3.33 R (5.24) 4.09 R (4.01...6.83) 7.3R A (6.60) Chocolate Pudding 5.52 [1] A (6.57) 5.49 [3) (6.64) 4.71 R (6.65) Turkey Sl w/Gravy [4) [4) 6.85 A Blueberry Cake [4] [4] 6.51 A

  11. Design, Test, and Acceptance Criteria for Helicopter Transparent Enclosures

    DTIC Science & Technology

    1978-11-01

    Visibility Data From Ballistic Tests . . .*. . 212 37 Dispersion of Penetrations in Witness Sheet . 219 38 Foam Penetration Data . . . . . . . . . o 224 39...light scattered and therefore lost in passage through the material. To provide a frame of reference, a material with 30% haze would be considered...polycarbonate materials were superior to glass in resisting impinge- ment abrasion; apparently due to ductility of the coating which minimized spallation

  12. Evaluation of test procedures for hydrogen environment embrittlement

    NASA Technical Reports Server (NTRS)

    Nelson, H. G.

    1974-01-01

    Report presents discussion of three common and primary influences on embrittlement process. Application of theoretical considerations to design of test coupons and methods is illustrated for both internal and external hydrogen embrittlement. Acceptable designs and methods are indicated.

  13. 14 CFR 34.62 - Test procedure (propulsion engines).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Test procedure (propulsion engines). 34.62... FUEL VENTING AND EXHAUST EMISSION REQUIREMENTS FOR TURBINE ENGINE POWERED AIRPLANES Test Procedures for Engine Exhaust Gaseous Emissions (Aircraft and Aircraft Gas Turbine Engines) § 34.62 Test...

  14. 49 CFR 665.27 - Procedures during testing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Procedures during testing. 665.27 Section 665.27 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BUS TESTING Operations § 665.27 Procedures during testing. (a) The...

  15. 49 CFR 665.27 - Procedures during testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Procedures during testing. 665.27 Section 665.27 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BUS TESTING Operations § 665.27 Procedures during testing. (a) The...

  16. 49 CFR 665.27 - Procedures during testing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Procedures during testing. 665.27 Section 665.27 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BUS TESTING Operations § 665.27 Procedures during testing. (a) The...

  17. 49 CFR 665.27 - Procedures during testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Procedures during testing. 665.27 Section 665.27 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BUS TESTING Operations § 665.27 Procedures during testing. (a) The...

  18. 49 CFR 665.27 - Procedures during testing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Procedures during testing. 665.27 Section 665.27 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BUS TESTING Operations § 665.27 Procedures during testing. (a) The...

  19. 40 CFR 91.404 - Test procedure overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Test procedure overview. 91.404 Section 91.404 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Test procedure overview. (a) The test consists of prescribed sequences of engine operating...

  20. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.162 Section 572.162 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The...

  1. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly and test procedure. 572.162 Section 572.162 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The...

  2. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Head assembly and test procedure. 572.162 Section 572.162 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The...

  3. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.162 Section 572.162 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The...

  4. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Head assembly and test procedure. 572.162 Section 572.162 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The...

  5. 46 CFR 170.190 - Stability test procedure modifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Stability test procedure modifications. 170.190 Section... Gravity § 170.190 Stability test procedure modifications. The authorized Coast Guard or ABS representative present at a stability test may allow a deviation from the requirements of §§ 170.180 and 170.185 if...

  6. Test report for run-in acceptance testing of hydrogen mitigation test pump-2

    SciTech Connect

    Brewer, A.K.; Kolowith, R.

    1995-01-01

    This document provides the results of the run-in test of the replacement mixer pump for the Tank 241-SY-101. The test was conducted at the 400 Area MASF facility between August 12 and September 29, 1994. The report includes findings, analysis, recommendations, and corrective actions taken.

  7. 14 CFR 135.301 - Crewmember: Tests and checks, grace provisions, training to accepted standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... provisions, training to accepted standards. 135.301 Section 135.301 Aeronautics and Space FEDERAL AVIATION...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING..., grace provisions, training to accepted standards. (a) If a crewmember who is required to take a test...

  8. 14 CFR 135.301 - Crewmember: Tests and checks, grace provisions, training to accepted standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... provisions, training to accepted standards. 135.301 Section 135.301 Aeronautics and Space FEDERAL AVIATION...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING..., grace provisions, training to accepted standards. (a) If a crewmember who is required to take a test...

  9. 14 CFR 135.301 - Crewmember: Tests and checks, grace provisions, training to accepted standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... provisions, training to accepted standards. 135.301 Section 135.301 Aeronautics and Space FEDERAL AVIATION...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING..., grace provisions, training to accepted standards. (a) If a crewmember who is required to take a test...

  10. 14 CFR 135.301 - Crewmember: Tests and checks, grace provisions, training to accepted standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... provisions, training to accepted standards. 135.301 Section 135.301 Aeronautics and Space FEDERAL AVIATION...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING..., grace provisions, training to accepted standards. (a) If a crewmember who is required to take a test...

  11. Human Factors Engineering. Part 1. Test Procedures

    DTIC Science & Technology

    1990-05-15

    Design (Subjective Testing Techniques ) AMC Regulation 70-13 Test Incident ,ind Related Reporting AR 602-2 Manpower and Personnel Integration :MANDRINT...collection techniques , to the particular item being tested. An HFE Test Planning Checklist for ensuring that applicable steps are followed is provided in...speed reduction techniques and direct readout devices &re used in the analysis of the recorded noise data, the frequency response characteristics of

  12. 40 CFR 86.1427 - Certification Short Test procedure; overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-Cycle Light-Duty Trucks; Certification Short Test Procedures § 86.1427 Certification Short Test... CO fuel, a moderate temperature test with Cold CO fuel, and a warm temperature test with FTP Otto-cycle test fuel, as described in table O-96-1 of § 86.1430. The manufacturer must complete testing...

  13. 40 CFR 86.1427 - Certification Short Test procedure; overview.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Cycle Light-Duty Trucks; Certification Short Test Procedures § 86.1427 Certification Short Test... CO fuel, a moderate temperature test with Cold CO fuel, and a warm temperature test with FTP Otto-cycle test fuel, as described in table O-96-1 of § 86.1430. The manufacturer must complete testing...

  14. 40 CFR 86.1427 - Certification Short Test procedure; overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Cycle Light-Duty Trucks; Certification Short Test Procedures § 86.1427 Certification Short Test... CO fuel, a moderate temperature test with Cold CO fuel, and a warm temperature test with FTP Otto-cycle test fuel, as described in table O-96-1 of § 86.1430. The manufacturer must complete testing...

  15. 40 CFR 86.1427 - Certification Short Test procedure; overview.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Cycle Light-Duty Trucks; Certification Short Test Procedures § 86.1427 Certification Short Test... CO fuel, a moderate temperature test with Cold CO fuel, and a warm temperature test with FTP Otto-cycle test fuel, as described in table O-96-1 of § 86.1430. The manufacturer must complete testing...

  16. 46 CFR 164.008-3 - Testing procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Bulkhead Panels § 164.008-3 Testing procedure. (a) Tests. All tests... designated by the Coast Guard. (b) Preparation of test specimen. (1) The test specimens shall be conditioned... such that there is no possibility of misinterpretation of test results due to the passage of flame...

  17. 16 CFR 1201.4 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... surrounded by at least one inch (2.5 centimeters) of water. (ii) Simulated weathering test. The equipment... thickness identical to those submitted for the impact test shall be used. (ii) Weathering tests—(A) (B... paragraph (e)(2)(i) of this section. (ii) Accelerated weathering test. The specimens shall be retained...

  18. 16 CFR 1201.4 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... surrounded by at least one inch (2.5 centimeters) of water. (ii) Simulated weathering test. The equipment... thickness identical to those submitted for the impact test shall be used. (ii) Weathering tests—(A) (B... paragraph (e)(2)(i) of this section. (ii) Accelerated weathering test. The specimens shall be retained...

  19. 16 CFR 1201.4 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... surrounded by at least one inch (2.5 centimeters) of water. (ii) Simulated weathering test. The equipment... thickness identical to those submitted for the impact test shall be used. (ii) Weathering tests—(A) (B... paragraph (e)(2)(i) of this section. (ii) Accelerated weathering test. The specimens shall be retained...

  20. 16 CFR 1201.4 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... surrounded by at least one inch (2.5 centimeters) of water. (ii) Simulated weathering test. The equipment... thickness identical to those submitted for the impact test shall be used. (ii) Weathering tests—(A) (B... paragraph (e)(2)(i) of this section. (ii) Accelerated weathering test. The specimens shall be retained...

  1. Test monkeys anesthetized by routine procedure

    NASA Technical Reports Server (NTRS)

    1965-01-01

    Test monkeys are safely anesthetized for five minutes by confining them for less than six minutes in enclosures containing a controlled volume of ether. Thus the monkeys can be properly and safely positioned on test couches and fitted with electrodes or other devices prior to physiological tests.

  2. Acceptance Test Report for the high pressure water jet system canister cleaning fixture

    SciTech Connect

    Burdin, J.R.

    1995-10-25

    This Acceptance Test confirmed the test results and recommendations, documented in WHC-SD-SNF-DTR-001, Rev. 0 Development Test Report for the High Pressure Water Jet System Nozzles, for decontaminating empty fuel canisters in KE-Basin. Optimum water pressure, water flow rate, nozzle size and overall configuration were tested

  3. Acceptance of Genetic Testing in a General Population: Age, Education and Gender Differences.

    ERIC Educational Resources Information Center

    Aro, A. R.; Hakonen, A.; Hietala, M.; Lonnqvist, J.; Niemela, P.; Peltonen, L; Aula, P.

    1997-01-01

    Effects of age, education, and gender on acceptance of genetic testing were studied. Finnish participants responded to a questionnaire presenting reasons for and against genetic testing (N=1,967). Intentions to take genetic tests, worries, and experience of genetic test or hereditary disease were also assessed. Results are presented and discussed.…

  4. Alternatives to animal testing: research, trends, validation, regulatory acceptance.

    PubMed

    Huggins, Jane

    2003-01-01

    Current trends and issues in the development of alternatives to the use of animals in biomedical experimentation are discussed in this position paper. Eight topics are considered and include refinement of acute toxicity assays; eye corrosion/irritation alternatives; skin corrosion/irritation alternatives; contact sensitization alternatives; developmental/reproductive testing alternatives; genetic engineering (transgenic) assays; toxicogenomics; and validation of alternative methods. The discussion of refinement of acute toxicity assays is focused primarily on developments with regard to reduction of the number of animals used in the LD(50) assay. However, the substitution of humane endpoints such as clinical signs of toxicity for lethality in these assays is also evaluated. Alternative assays for eye corrosion/irritation as well as those for skin corrosion/irritation are described with particular attention paid to the outcomes, both successful and unsuccessful, of several validation efforts. Alternative assays for contact sensitization and developmental/reproductive toxicity are presented as examples of methods designed for the examination of interactions between toxins and somewhat more complex physiological systems. Moreover, genetic engineering and toxicogenomics are discussed with an eye toward the future of biological experimentation in general. The implications of gene manipulation for research animals, specifically, are also examined. Finally, validation methods are investigated as to their effectiveness, or lack thereof, and suggestions for their standardization and improvement, as well as implementation are reviewed.

  5. 40 CFR Appendix I to Subpart V of... - Recommended Test Procedures and Test Criteria and Recommended Durability Procedures To...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... closing temperature shall be measured on an increasing temperature change. C. Carburetor Accelerator Pumps.... Reserved for Camshafts N. Reserved for Pistons O. Oxidizing Catalytic Converters 1. Test Procedures...

  6. 40 CFR Appendix I to Subpart V of... - Recommended Test Procedures and Test Criteria and Recommended Durability Procedures To...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... closing temperature shall be measured on an increasing temperature change. C. Carburetor Accelerator Pumps.... Reserved for Camshafts N. Reserved for Pistons O. Oxidizing Catalytic Converters 1. Test Procedures...

  7. 40 CFR Appendix I to Subpart V of... - Recommended Test Procedures and Test Criteria and Recommended Durability Procedures To...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... closing temperature shall be measured on an increasing temperature change. C. Carburetor Accelerator Pumps.... Reserved for Camshafts N. Reserved for Pistons O. Oxidizing Catalytic Converters 1. Test Procedures...

  8. 40 CFR Appendix I to Subpart V of... - Recommended Test Procedures and Test Criteria and Recommended Durability Procedures To...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... closing temperature shall be measured on an increasing temperature change. C. Carburetor Accelerator Pumps.... Reserved for Camshafts N. Reserved for Pistons O. Oxidizing Catalytic Converters 1. Test Procedures...

  9. 40 CFR Appendix I to Subpart V of... - Recommended Test Procedures and Test Criteria and Recommended Durability Procedures To...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... closing temperature shall be measured on an increasing temperature change. C. Carburetor Accelerator Pumps.... Reserved for Camshafts N. Reserved for Pistons O. Oxidizing Catalytic Converters 1. Test Procedures...

  10. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... analog signal output, connect an integrating-type digital meter (DM) suitable for the test analyzer's... interruption occurred shall be repeated. (6) During each test block, manual adjustments to the electronics, gas... least 10 centimeters per hour (or equivalent resolution for a digital representation) shall be used...

  11. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... analog signal output, connect an integrating-type digital meter (DM) suitable for the test analyzer's... interruption occurred shall be repeated. (6) During each test block, manual adjustments to the electronics, gas... least 10 centimeters per hour (or equivalent resolution for a digital representation) shall be used...

  12. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... analog signal output, connect an integrating-type digital meter (DM) suitable for the test analyzer's... interruption occurred shall be repeated. (6) During each test block, manual adjustments to the electronics, gas... least 10 centimeters per hour (or equivalent resolution for a digital representation) shall be used...

  13. 40 CFR 53.43 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-sectional area of the test section of the wind tunnel. The mean wind speed in the test section must be... into the wind tunnel and allow the particle concentration to stabilize. (vi) Install an array of five or more evenly spaced isokinetic samplers in the sampling zone (see § 53.42(d)) of the wind...

  14. 16 CFR 1615.4 - Test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... in this test method is illustrated in Figure 1 and detailed in Engineering Drawings, Nos. 1 to 7. (2... holder to be used in this test method is illustrated in Figure 2 and detailed in Engineering Drawing No... detailed in Engineering Drawing No. 6. It shall have a tube of 1.1 cm. (0.43 in.) inside diameter....

  15. Procedural Variation in Behavioral Avoidance Tests

    ERIC Educational Resources Information Center

    Bernstein, Douglas A.; Nietzel, Michael T.

    1973-01-01

    The data on approach to snakes provides srong support for the contention that the behavorial avoidance test is not immune to bias introduced by the operation of situational variables that have usually been allowed to vary in uncontrolled fashion in psychotherapy analogue research. Behavior of test subjects can be influenced not only in terms of…

  16. Results of the NASA Kennedy Space Center 50-MHz Doppler Radar Wind Profiler Operational Acceptance Test

    NASA Technical Reports Server (NTRS)

    Barbre', Robert E., Jr.; Decker, Ryan K.; Leahy, Frank B.; Huddleston, Lisa

    2016-01-01

    This paper presents results of the new Kennedy Space Center (KSC) 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT). The goal of the OAT was to verify the data quality of the new DRWP against the performance of the previous DRWP in order to use wind data derived by the new DRWP for space launch vehicle operations support at the Eastern Range. The previous DRWP was used as a situational awareness asset for mission operations to identify rapid changes in the wind environment that weather balloons cannot depict. The Marshall Space Flight Center's Natural Environments Branch assessed data from the new DRWP collected during Jan-Feb 2015 against a specified set of test criteria. Data examination verified that the DRWP provides complete profiles every five minutes from 1.8-19.5 km in vertical increments of 150 m. Analysis of 49 concurrent DRWP and balloon profiles presented root mean square wind component differences around 2.0 m/s. Evaluation of the DRWP's coherence between five-minute wind pairs found the effective vertical resolution to be Nyquist-limited at 300 m for both wind components. In addition, the sensitivity to rejecting data that do not have adequate signal was quantified. This paper documents the data, quality control procedures, methodology, and results of each analysis.

  17. 40 CFR 91.408 - Pre-test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... should agree within five percent). (c) Analyzer pre-test procedures. (1) If necessary, warm up and.... (iii) A hang-up check is permitted. (4) Check analyzer zero and span before and after each test at...

  18. Antimicrobial Testing Methods & Procedures: MB-17-03

    EPA Pesticide Factsheets

    Information about ATMP - SOP Neutralization Confirmation Procedures for the AOAC Use-dilution method (UDM), the AOAC Germicidal Spray Products as Disinfectants Test (GSPT) and the Disinfectant Towelette Test (DTT) - MB-17-03

  19. 40 CFR 60.74 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Nitric Acid Plants § 60.74 Test methods and procedures. (a) In conducting the performance tests required in §...

  20. 40 CFR 60.386 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Metallic Mineral Processing Plants § 60.386 Test methods and procedures. (a) In conducting the performance tests required...

  1. Integrated Performance Testing Workshop - Supplemental Materials (Scripts and Procedures)

    SciTech Connect

    Baum, Gregory A.

    2014-02-01

    A variety of performance tests are described relating to: Material Transfers; Emergency Evacuation; Alarm Response Assessment; and an Enhanced Limited Scope Performance Test (ELSPT). Procedures are given for: nuclear material physical inventory and discrepancy; material transfers; and emergency evacuation.

  2. 40 CFR 87.5 - Special test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) CONTROL OF AIR POLLUTION FROM AIRCRAFT AND AIRCRAFT ENGINES General Provisions § 87.5 Special test... susceptible to satisfactory testing by the procedures set forth herein. Prior to taking action on any...

  3. 40 CFR 60.154 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Sewage Treatment Plants § 60.154 Test methods and procedures. (a) In conducting the performance tests required in §...

  4. 14 CFR 34.62 - Test procedure (propulsion engines).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... FUEL VENTING AND EXHAUST EMISSION REQUIREMENTS FOR TURBINE ENGINE POWERED AIRPLANES Test Procedures for Engine Exhaust Gaseous Emissions (Aircraft and Aircraft Gas Turbine Engines) § 34.62 Test...

  5. 14 CFR 25.1045 - Cooling test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....1045 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Cooling § 25.1045 Cooling test procedures. (a... correspond to the applicable performance requirements. The cooling tests must be conducted with the...

  6. 40 CFR 205.160-4 - Testing procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Testing procedures. 205.160-4 Section 205.160-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycles § 205.160-4 Testing procedures....

  7. 40 CFR 211.212-4 - Testing procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Testing procedures. 211.212-4 Section 211.212-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS PRODUCT NOISE LABELING Hearing Protective Devices § 211.212-4 Testing procedures. (a)...

  8. 40 CFR 76.15 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a)...

  9. 40 CFR 76.15 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a)...

  10. 40 CFR 76.15 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a)...

  11. 40 CFR 76.15 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a)...

  12. 40 CFR 76.15 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 17 2012-07-01 2012-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a)...

  13. 40 CFR 1066.15 - Overview of test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Overview of test procedures. 1066.15 Section 1066.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS VEHICLE-TESTING PROCEDURES Applicability and General Provisions § 1066.15 Overview of...

  14. 40 CFR 92.103 - Test procedures; overview.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.103 Test... locomotive engines. The procedures specified here are intended to measure brake-specific mass emissions of... organics (i.e., hydrocarbons, alcohols, and aldehydes); diesel-fueled and biodiesel-fueled...

  15. 40 CFR 92.103 - Test procedures; overview.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.103 Test... locomotive engines. The procedures specified here are intended to measure brake-specific mass emissions of... organics (i.e., hydrocarbons, alcohols, and aldehydes); diesel-fueled and biodiesel-fueled...

  16. 40 CFR 86.334-79 - Test procedure overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.334-79... cycle and 1 hot cycle. The Diesel engine test consists of 3 idle modes and 5 power modes at each of 2 speeds which span the typical operating range of Diesel engines. These procedures require...

  17. 40 CFR 610.64 - Track test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... using the chassis dynamometer procedures. (An obvious example is a device that changes the aerodynamic... economy test. Although essentially the same procedures will be used for track testing as for dynamometer... in § 610.43(a)(1)(ii). Preconditioning may take place either on the track or on a dynamometer. The...

  18. 49 CFR 572.72 - Head assembly and test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Head assembly and test procedure. 572.72 Section...-Year-Old Child § 572.72 Head assembly and test procedure. (a) Head assembly. The head consists of the... on SA 106C 001, sheet 8. (b) Head assembly impact response requirements. When the head is impacted...

  19. 49 CFR 572.72 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.72 Section...-Year-Old Child § 572.72 Head assembly and test procedure. (a) Head assembly. The head consists of the... on SA 106C 001, sheet 8. (b) Head assembly impact response requirements. When the head is impacted...

  20. 49 CFR 572.72 - Head assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly and test procedure. 572.72 Section...-Year-Old Child § 572.72 Head assembly and test procedure. (a) Head assembly. The head consists of the... on SA 106C 001, sheet 8. (b) Head assembly impact response requirements. When the head is impacted...

  1. 49 CFR 572.72 - Head assembly and test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Head assembly and test procedure. 572.72 Section...-Year-Old Child § 572.72 Head assembly and test procedure. (a) Head assembly. The head consists of the... on SA 106C 001, sheet 8. (b) Head assembly impact response requirements. When the head is impacted...

  2. 49 CFR 572.72 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.72 Section...-Year-Old Child § 572.72 Head assembly and test procedure. (a) Head assembly. The head consists of the... on SA 106C 001, sheet 8. (b) Head assembly impact response requirements. When the head is impacted...

  3. 40 CFR 87.62 - Test procedure (propulsion engines).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedure (propulsion engines). 87.62 Section 87.62 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Exhaust Gaseous Emissions (Aircraft and Aircraft Gas Turbine Engines) § 87.62 Test procedure...

  4. Optimum Testing Procedures for System Diagnosis and Fault Isolation.

    DTIC Science & Technology

    1981-03-31

    fault detection and isolation procedures are directed...Conference, Vol. 32 (1968), pp. 529-534. 4. Cohn, H. Y. and Ott, G., "Design of Adaptive Procedures for Fault Detection and Isolation ," IEEE... detection and isolation Built-in-test Optimum sequenceof testing Branch-and Bound 20. ABSTRACT (Contin... on revera. .ide f nwcider’ and identify

  5. Acceptance testing for battery-electric bus procurements: Planning, inspection, and testing guidelines. Final report

    SciTech Connect

    1998-05-01

    This Acceptance Test Plan (ATP) is intended to guide the inspection and testing of the bus(es) fabricated by Contractor for Buyer in accordance with the contract(s) dated MM, DD, YYYY, and the subsequent change orders and contract modifications. The inspection worksheets and report forms presented in the Appendix are intended to assist in documentation of the inspection process and its findings. Alternatively, existing Contractor worksheets and reports may be used if it can be demonstrated that all relevant technical criteria are encompassed therein. This ATP is intended solely as a guide for the inspection and testing of the bus(es), their associated service, operating, training, and maintenance manuals, mechanical and electrical schematics, software and interfaces, and the special tools delivered in accordance with the technical specifications of the contract(s) cited above. Determination of the Contractor`s compliance with contractual provisions other than those of the technical specifications is beyond the scope of this ATP. Furthermore, this ATP is not intended to determine compliance of Contractor`s Bid Package with requirements of the bid solicitation, nor is it intended to be used in activities associated with the Design Review specified in the contractual documents.

  6. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-1 shall apply to both of these tests. (ii) Connect an integrating-type digital meter (DM) suitable... interruption occurred shall be repeated. (6) During each block, manual adjustments to the electronics, gas,...

  7. Suggested Operating Procedures for Aquifer Pumping Tests

    EPA Pesticide Factsheets

    This document is intended as a primer, describing the process for the design and performance of an “aquifer test” (how to obtain reliable data from a pumping test) to obtain accurate estimates of aquifer parameters.

  8. Flexible Support Test Procedure and Results

    SciTech Connect

    Kurita, C.H.; /Fermilab

    1987-12-04

    Upon completion of the fabrication process, the four central calorimeter cryostat flexible support assemblies were sent to Construction Technology Laboratories (CTL) in Skokie, IL, where the required tests were performed for Richmond Lox prior to the installation of the stanchions in the cryostat. These tests were to simulate the simultaneous axial and transverse loading experienced by the stanchions when the cryostat undergoes the cool down process.

  9. HIPAA STANDARDS: Dual Code Sets Are Acceptable for Reporting Medical Procedures

    DTIC Science & Technology

    2002-08-01

    open surgery, laparoscopy ), the technology that was used to complete the procedure (e.g., laparoscope, endoscope), and the device that was...distinct procedures such as open coronary angioplasty (code 3603), percutaneous angioplasty (code 3606), and intercoronary thrombosis infusion (code 3604...code, code 3606, “insertion of coronary artery stent,” would also have to be reported. For payment or research purposes, to know how many vessels

  10. A unified framework for weighted parametric multiple test procedures.

    PubMed

    Xi, Dong; Glimm, Ekkehard; Maurer, Willi; Bretz, Frank

    2017-03-29

    We describe a general framework for weighted parametric multiple test procedures based on the closure principle. We utilize general weighting strategies that can reflect complex study objectives and include many procedures in the literature as special cases. The proposed weighted parametric tests bridge the gap between rejection rules using either adjusted significance levels or adjusted p-values. This connection is made by allowing intersection hypotheses of the underlying closed test procedure to be tested at level smaller than α. This may be also necessary to take certain study situations into account. For such cases we introduce a subclass of exact α-level parametric tests that satisfy the consonance property. When the correlation is known only for certain subsets of the test statistics, a new procedure is proposed to fully utilize this knowledge within each subset. We illustrate the proposed weighted parametric tests using a clinical trial example and conduct a simulation study to investigate its operating characteristics.

  11. Performance testing of personnel dosimetry services. A revised procedures manual

    SciTech Connect

    Miklos, J.; Plato, P.

    1983-02-01

    The US Nuclear Regulatory Commission's pilot study of the Health Physics Society Standards Committee Standard, Criteria for Testing Personnel Dosimetry Performance, was begun in 1977. A third test of this Standard was conducted from November, 1981 through April, 1982. The objective of this Procedures Manual is to describe the procedures used for Test No. 3 which reflect the changes in the Standard from Tests No. 1 and No. 2. This Manual describes each of the radiation sources used for Test No. 3, as well as the administrative procedures used during the test program. Methods of irradiation, quality control, data analysis, record keeping, and handling large numbers of dosimeters are presented. This Manual discusses the role of the National Bureau of Standards in verifying the validity of the calibration of each radiation source. Suggestions for improving irradiation procedures are included as well as recommendations that will facilitate the operation of the permanent testing facility.

  12. Improved Flight Test Procedures for Flutter Clearance

    NASA Technical Reports Server (NTRS)

    Lind, Rick C.; Brenner, Martin J.; Freudinger, Lawrence C.

    1997-01-01

    Flight flutter testing is an integral part of flight envelope clearance. This paper discusses advancements in several areas that are being investigated to improve efficiency and safety of flight test programs. Results are presented from recent flight testing of the F/A-18 Systems Research Aircraft. A wingtip excitation system was used to generate aeroelastic response data. This system worked well for many flight conditions but still displayed some anomalies. Wavelet processing is used to analyze the flight data. Filtered transfer functions are generated that greatly improve system identification. A flutter margin is formulated that accounts for errors between a model and flight data. Worst-case flutter margins are computed to demonstrate the flutter boundary may lie closer to the flight envelope than previously estimated. This paper concludes with developments for a distributed flight analysis environment and on-line health monitoring.

  13. 14 CFR 125.293 - Crewmember: Tests and checks, grace provisions, accepted standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRCRAFT Flight Crewmember Requirements § 125.293 Crewmember: Tests and checks, grace provisions, accepted standards. (a) If a crewmember who is required to take a test or a flight check under this part completes the test or flight check in the calendar month before or after the calendar month in which it...

  14. 14 CFR 125.293 - Crewmember: Tests and checks, grace provisions, accepted standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT Flight Crewmember Requirements § 125.293 Crewmember: Tests and checks, grace provisions, accepted standards. (a) If a crewmember who is required to take a test or a flight check under this part completes the test or flight check in the calendar month before or after the calendar month in which it...

  15. 14 CFR 125.293 - Crewmember: Tests and checks, grace provisions, accepted standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT Flight Crewmember Requirements § 125.293 Crewmember: Tests and checks, grace provisions, accepted standards. (a) If a crewmember who is required to take a test or a flight check under this part completes the test or flight check in the calendar month before or after the calendar month in which it...

  16. 14 CFR 125.293 - Crewmember: Tests and checks, grace provisions, accepted standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT Flight Crewmember Requirements § 125.293 Crewmember: Tests and checks, grace provisions, accepted standards. (a) If a crewmember who is required to take a test or a flight check under this part completes the test or flight check in the calendar month before or after the calendar month in which it...

  17. 14 CFR 125.293 - Crewmember: Tests and checks, grace provisions, accepted standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AIRCRAFT Flight Crewmember Requirements § 125.293 Crewmember: Tests and checks, grace provisions, accepted standards. (a) If a crewmember who is required to take a test or a flight check under this part completes the test or flight check in the calendar month before or after the calendar month in which it...

  18. 77 FR 51880 - Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... COMMISSION 10 CFR Parts 2 and 52 RIN 3150-AI77 Requirements for Maintenance of Inspections, Tests, Analyses... regulations related to verification of nuclear power plant construction activities through inspections, tests... determining that inspections, tests, or analyses were performed as required, or that acceptance criteria...

  19. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Production Inspection and Tests of Approved Equipment and Materials § 159.007-5 Production inspections and...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under... 46 Shipping 6 2011-10-01 2011-10-01 false Production inspections and tests: Application...

  20. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Production Inspection and Tests of Approved Equipment and Materials § 159.007-5 Production inspections and...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under... 46 Shipping 6 2013-10-01 2013-10-01 false Production inspections and tests: Application...

  1. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Production Inspection and Tests of Approved Equipment and Materials § 159.007-5 Production inspections and...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under... 46 Shipping 6 2010-10-01 2010-10-01 false Production inspections and tests: Application...

  2. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Production Inspection and Tests of Approved Equipment and Materials § 159.007-5 Production inspections and...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under... 46 Shipping 6 2014-10-01 2014-10-01 false Production inspections and tests: Application...

  3. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Production Inspection and Tests of Approved Equipment and Materials § 159.007-5 Production inspections and...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under... 46 Shipping 6 2012-10-01 2012-10-01 false Production inspections and tests: Application...

  4. Military Publications, Index of Test Operations Procedures

    DTIC Science & Technology

    1981-10-01

    MAY 80 6-2-545 (L) RADIO RECEIVER, SPURIOUS RESPONSE A088519 11 JUL 80 6-2-550 (L) RADIAC DOSIMETER CALIBRATION ACCURACY A092271 29 OU. 80 6-2-551 (L...L) COMPATIBILITY, ELECTROMAGNETIC A086440 29 FEB 80 6-2-561 (L) DOSIMETER DIREECTIONAL DEPENDENCE, RJADIAC AD92235 19 NOV 80 6-2-562 WL) RATEMETER...DIRECTIONAL DEPENDENCE, RADIACA090591 29 AUG 80 6-2-563 (L) RADIAC DOSIMETER LEAKAGE TEST A095680 11 FEB 81 6-3-013 (H) TESTING AIRCRAFT INSTRUMENTS

  5. Test report for run-in acceptance testing of hydrogen mitigation retrieval Pump-3

    SciTech Connect

    Berglin, B.G.

    1997-08-15

    This report will provide the findings of the demonstration test conducted on the Double-Shell Tank (DST) 241-SY-101 HMR Pump-3 in accordance with WHC-SDWM-TP-434 ``Test plan for run-in acceptance testing of hydrogen mitigation/retrieval pump-3`` at the 400 Area Maintenance and Storage Facility (MASF) building from 7 June 1996 through 30 July 1996 per work package 4A-96-92/W. The DST 241-SY-101 hydrogen mitigation retrieval Pump-3 is a 200-HP submersible electric driven pump that has been modified for use in the DST 241-SY-101 containing mixed waste located in the 200W area. The pump has a motor driven rotation mechanism that allows the pump column to rotate through 355{degree}. Prior to operation, pre-operational checks were performed which included loop calibration grooming and alignment of instruments, learning how plumb HMR-3 assembly hung in a vertical position and bump test of the motor to determine rotation direction. The pump was tested in the MASF Large Diameter Cleaning Vessel (LDCV) with process water at controlled temperatures and levels. In addition, the water temperature of the cooling water to the motor oil heat exchanger was recorded during testing. A 480-volt source powered a Variable Frequency Drive (VFD). The VFD powered the pump at various frequencies and voltages to control speed and power output of the pump. A second VFD powered the oil cooling pump. A third VFD was not available to operate the rotational drive motor during the 72 hour test, so it was demonstrated as operational before and after the test. A Mini Acquisition and Control System (Mini-DACS) controls pump functions and monitoring of the pump parameters. The Mini-DACS consists of three computers, software and some Programmable Logic Controllers (PLC). Startup and shutdown of either the pump motor or the oil cooling pump can be accomplished by the Mini-DACS. When the pump was in operation, the Mini-DACS monitors automatically collects data electronically. However, some required data

  6. 40 CFR 91.607 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... weekends or holidays. (iii) If the manufacturer's service or target is less than the minimum rate specified... target. (3) Service accumulation must be completed on a sufficient number of test engines during... nonroad engine sales for the United States market for the applicable year of 7,500 or greater...

  7. 40 CFR 91.607 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... weekends or holidays. (iii) If the manufacturer's service or target is less than the minimum rate specified... target. (3) Service accumulation must be completed on a sufficient number of test engines during... nonroad engine sales for the United States market for the applicable year of 7,500 or greater...

  8. 16 CFR 1610.6 - Test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... surface textile fabrics, the direction of the lay of the surface fibers shall be parallel with the long... correct direction of the lay of the raised surface fibers, preliminary tests can be done to determine the... fabric not more than 6.4 mm (0.25 in) in from the side to determine the lay of the surface fibers....

  9. 49 CFR 383.131 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS COMMERCIAL DRIVER'S LICENSE... endorsements as specified in subpart F of this part; (3) The substance of the knowledge and skills which... provide standardized scoring sheets for the skills tests, as well as standardized driving instructions...

  10. Procedures for Criterion Referenced Tailored Testing.

    DTIC Science & Technology

    1981-08-01

    EISENHOWER AVENUE 5001 Eisenhower Avenue ALEXANDRIA, VA 22333 Alexandria, VA 22333 Dr. Milton S. Katz Training Technical Area U.S. Army Research Institute...Box 11A, Yale Station Educational Testing Service New Haven, CT 06520 Princeton, NJ 08540 DR. PATRICK SUPPES 1 Dr. Phyllis Weaver INSTITUTE FOR

  11. Toward standardization of EAP actuators test procedures

    NASA Astrophysics Data System (ADS)

    Fernandez, Diego; Moreno, Luis; Baselga, Juan

    2005-05-01

    Since the field of Electroactive Polymers (EAP) actuators is fairly new there are no standard testing processes for such intelligent materials. This drawback can seriously limit the scope of application of EAP actuators, since the targeted industrial sectors (aerospace, biomedical...) demand high reliability and product assurance. As a first iteration two elements are required to define a test standard for an EAP actuator: a Unit Tester, and a Component Specification. In this paper a EAP Unit Tester architecture is presented along with the required classification of measurements to be included in the EAP actuator Component Specification. The proposed EAP Unit Tester allows on-line monitoring and recording of the following properties of the specimen under test: large deformation, small tip displacement, temperature at the electrodes, weight of the specimen, voltage and current driven into the EAP, load being applied to the actuator, output voltage of the EAP in sensing operation and mode of operation (structure/sensor/actuator/smart). The measurements are taken simultaneously, in real-time. The EAP Unit Tester includes a friendly Graphical User Interface. It uses embedded Excel tools to visualize data. In addition, real-time connectivity with MATLAB allows an easy testing of control algorithms. A novel methodology to measure the properties of EAP specimens versus a variable load is also presented. To this purpose a force signals generator in the range of mN was developed. The device is based on a DC mini-motor. It generates an opposing force to the movement of the EAP actuator. Since the device constantly opposes the EAP actuator movement it has been named Digital Force Generator (DFG). The DFG design allows simultaneous length and velocity measuring versus different load signals. By including such a device in the EAP Unit Tester the most suitable application for the specimen under test can be easily identified (vibration damper, large deformation actuator, large

  12. Full-Scale Cask Testing and Public Acceptance of Spent Nuclear Fuel Shipments - 12254

    SciTech Connect

    Dilger, Fred; Halstead, Robert J.; Ballard, James D.

    2012-07-01

    Full-scale physical testing of spent fuel shipping casks has been proposed by the National Academy of Sciences (NAS) 2006 report on spent nuclear fuel transportation, and by the Presidential Blue Ribbon Commission (BRC) on America's Nuclear Future 2011 draft report. The U.S. Nuclear Regulatory Commission (NRC) in 2005 proposed full-scale testing of a rail cask, and considered 'regulatory limits' testing of both rail and truck casks (SRM SECY-05-0051). The recent U.S. Department of Energy (DOE) cancellation of the Yucca Mountain project, NRC evaluation of extended spent fuel storage (possibly beyond 60-120 years) before transportation, nuclear industry adoption of very large dual-purpose canisters for spent fuel storage and transport, and the deliberations of the BRC, will fundamentally change assumptions about the future spent fuel transportation system, and reopen the debate over shipping cask performance in severe accidents and acts of sabotage. This paper examines possible approaches to full-scale testing for enhancing public confidence in risk analyses, perception of risk, and acceptance of spent fuel shipments. The paper reviews the literature on public perception of spent nuclear fuel and nuclear waste transportation risks. We review and summarize opinion surveys sponsored by the State of Nevada over the past two decades, which show consistent patterns of concern among Nevada residents about health and safety impacts, and socioeconomic impacts such as reduced property values along likely transportation routes. We also review and summarize the large body of public opinion survey research on transportation concerns at regional and national levels. The paper reviews three past cask testing programs, the way in which these cask testing program results were portrayed in films and videos, and examines public and official responses to these three programs: the 1970's impact and fire testing of spent fuel truck casks at Sandia National Laboratories, the 1980's

  13. Test Operations Procedure (TOP) 03-2-827 Test Procedures for Video Target Scoring Using Calibration Lights

    DTIC Science & Technology

    2016-04-04

    Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 03-2-827 Test Procedures for Video Target Scoring Using...NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Survivability/Lethality Division (TEDT-AT-SLB) U.S. Army Aberdeen Test Center 400...ADDRESS(ES) Range Infrastructure Division (CSTE-TM) U.S. Army Test and Evaluation Command 2202 Aberdeen Boulevard Aberdeen Proving Ground, MD 21005

  14. 16 CFR 1616.5 - Test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... illustrated in Figure 1 and detailed in Engineering Drawings, Numbers 1 through 7. EC03OC91.089 EC03OC91.090... specimen holder to be used in this test method is detailed in Engineering Drawing Number 7. It is designed... detailed in Engineering Drawing Number 6. It shall have a tube of 1.1 cm. (0.43 in.) inside diameter....

  15. Lethality Rate Estimation and Testing Procedures

    DTIC Science & Technology

    1989-09-11

    AUTHOR(S) Steven W. Rust, Paul I. Feder, Frederick R. Todt, Ronald L. Joiner Ila. TYPE OF REPORT 13b, IME .OVFRE 8 14. ATE OF PORT (VeerMontl.vay) 15...GD, and VX Administered Topically to Rabbits " (MREF Protocol 21, May 1985) to compare liquid or powder experimental decontaminants against the dual...chemical surety materick (CSM). The standardized screen is based on a lethality endpoint in laboratory albino rabbits . An essential aspect of this testing

  16. Test procedure for cation exchange chromatography

    SciTech Connect

    Cooper, T.D.

    1994-08-24

    The purpose of this test plan is to demonstrate the synthesis of inorganic antimonate ion exchangers and compare their performance against the standard organic cation exchangers. Of particular interest is the degradation rate of both inorganic and organic cation exchangers. This degradation rate will be tracked by determining the ion exchange capacity and thermal stability as a function of time, radiation dose, and chemical reaction.

  17. 40 CFR 80.165 - Certification test procedures and standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... procedures and standards. This section specifies the deposit control test requirements and performance... for such records. (a) Fuel injector deposit control testing. (1) The required test fuel must produce... completion of the test cycle, but not more than every 1,000 miles. (b) Intake valve deposit control...

  18. 40 CFR 1066.410 - Dynamometer test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Dynamometer test procedure. (a) Dynamometer testing may consist of multiple drive cycles with both cold-start... cold-start test cycles) or drive the vehicle onto the dynamometer (for hot-start and hot-running cycles... Capacity and Position Specifications for Vehicles at or Below 14,000 pounds GVWR Test cycle...

  19. 46 CFR 61.40-10 - Test procedure details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Test procedure details. 61.40-10 Section 61.40-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-10 Test...

  20. 46 CFR 61.40-10 - Test procedure details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Test procedure details. 61.40-10 Section 61.40-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-10 Test...