  1. Nitrogen chiller acceptance test procedure

    SciTech Connect

    Kostelnik, A.J.

    1995-03-07

    This document includes the inspection and testing requirements for the Nitrogen Chiller unit. The Chiller will support the Rotary Mode core Sampling System during the summer. The Chiller cools the Nitrogen Purge Gas that is used when drilling in tank wastes to cool the drill bit.

  2. DACS upgrade acceptance test procedure

    SciTech Connect

    Zuehlke, A.C.

    1994-09-28

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H{sub 2} concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations.

  3. Void fraction instrument acceptance test procedure

    SciTech Connect

    Pearce, K.L.

    1994-09-15

    This acceptance test procedure (ATP) was written to test the void fraction instrument (VFI) and verify that the unit is ready for field service. The procedure verifies that the mechanical and electrical features (not specifically addressed in the software ATP) and software alarms are operating as designed.

  4. W-087 Acceptance test procedure. Revision 1

    SciTech Connect

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  5. Breathing air trailer acceptance test procedure

    SciTech Connect

    Kostelnik, A.J.

    1994-09-14

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0251 Rev. 0 and ECNs 613530 and 606113. The equipment being tested is a Breathing Air Supply Trailer purchased as a Design and Fabrication procurement activity for use in the core sampling program. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller`s location. This test procedure is to verify that the American Bristol Industries, Inc., Model 5014-0001 low pressure Mobile Breathing Air Trailer, meets or exceeds the requirements of the Westinghouse Hanford specification.

  6. Gas characterization system software acceptance test procedure

    SciTech Connect

    Vo, C.V.

    1996-02-27

    This document details the Software Acceptance Testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  7. Acceptance test procedure for shuttle actuators simulator (elevon subsystem)

    NASA Technical Reports Server (NTRS)

    Barr, J.

    1976-01-01

    The acceptance test procedure is described for the Lockheed Electronics Elevon Servoactuator Simulator to be used in the Shuttle Avionics Integration Laboratory (SAIL). The intent of this acceptance test procedure is to comply with the technical Shuttle Actuators Simulator Requirements. Acceptance tests will be performed on each Elevon Servoactuator Simulator.

  8. Operator coil monitoring Acceptance Test Procedure

    SciTech Connect

    Erhart, M.F.

    1995-05-16

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  9. Operator coil monitoring acceptance test procedure

    SciTech Connect

    Erhart, M.F.

    1995-06-05

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  10. Acceptance Test Procedure for New Pumping Instrumentation & Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-08-14

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  11. Acceptance test procedure for High Pressure Water Jet System

    SciTech Connect

    Crystal, J.B.

    1995-05-30

    The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet.

  12. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    SciTech Connect

    Blackaby, W.B.

    1997-09-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays.

  13. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    SciTech Connect

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  14. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    SciTech Connect

    JOHNSTON, D.C.

    2000-08-23

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  15. Acceptance test procedure for SY Tank Farm replacement exhauster unit

    SciTech Connect

    Becken, G.W.

    1994-12-16

    The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

  16. Acceptance test procedure for Project W-049H

    SciTech Connect

    Buckles, D.I.

    1994-09-29

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field.

  17. Acceptance test procedure MICON software exhaust fan control modifications

    SciTech Connect

    SILVAN, G.R.

    1999-05-21

    This acceptance test verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, and the alarms for the new emergency fan damper backup air compressor.

  18. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    SciTech Connect

    JOHNS, B.R.

    1999-10-28

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  19. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    SciTech Connect

    KOCH, M.R.

    2000-02-03

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  20. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    SciTech Connect

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  1. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    SciTech Connect

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  2. Acceptance test procedure for the 105-KW isolation barrier leak rate

    SciTech Connect

    McCracken, K.J.

    1995-05-19

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices.

  3. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    SciTech Connect

    KOCH, M.R.

    1999-12-13

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop.

  4. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-03-27

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  5. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  6. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  7. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    SciTech Connect

    KOCH, M.R.

    1999-10-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.

  8. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid U

    SciTech Connect

    KOCH, M.R.

    2000-12-05

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  9. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    SciTech Connect

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  10. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect

    KOCH, M.R.

    2000-06-20

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-03-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  13. PDSS/IMC qualification test software acceptance procedures

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Tests to be performed for qualifying the payload development support system image motion compensator (IMC) are identified. The performance of these tests will verify the IMC interfaces and thereby verify the qualification test software.

  14. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    SciTech Connect

    BARNES, D.A.

    2000-06-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  15. Tank Monitoring and Control Sys (TMACS) Acceptance Test Procedure

    SciTech Connect

    WANDLING, R.R.

    1999-11-08

    The purpose of this document is to describe tests performed to validate Revision 11.2 of the TMACS Monitor and Control System (TMCACS) and verify that the software functions as intended by design. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  16. MAC mini acceptance test procedure, software Version 3.0

    SciTech Connect

    Russell, V.K.

    1994-10-17

    The K Basins Materials Accounting (MAC) programs had some major improvements made to it to organize the main-tables by Location, Canister, and Material. This ATP describes how the code was to be tested to verify its correctness.

  17. MAC mini acceptance test procedures, software Version 3.3

    SciTech Connect

    Russell, V.K.

    1994-10-17

    The K Basins Materials Accounting (MAC) programs had some improvements made to it to to change slightly the access authorized users had to the modification of critical data. This ATP describes how the code was to be tested to verify its correctness.

  18. MBA acceptance test procedures, software Version 1.4

    SciTech Connect

    Mullaney, J.E.; Russell, V.K.

    1994-10-17

    The Mass Balance Program (MBA) is an adjunct to the Materials Accounting database system, Version 3.4. MBA was written to equip the personnel performing K-Basin encapsulation tasks with a conservative estimate of accumulated sludge during the processing of canisters into and out of the chute. The K Basins Materials Balance programs had some minor improvements made to it to feedback the chute processing status to the operator better. This ATP describes how the code was to be tested to verify its correctness.

  19. Project B610 process control configuration acceptance test procedure

    SciTech Connect

    Silvan, G.R.

    1994-09-20

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator`s console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A.

  20. Acceptance test procedure for the MO-293 (1722) 10-wide mobile office

    SciTech Connect

    Wallace, S.C.

    1994-12-28

    This Acceptance Test Procedure has been prepared to demonstrate that the Fire Protection System functions as required by project criteria. The test results will be issued as an acceptance test report after all the testing is complete. This facility is part of the Spent Nuclear Fuel Project. An appendix is provided as a checklist of activities to be performed by the fire alarm system installer to ensure proper installation and operation.

  1. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-07-25

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid.

  2. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    SciTech Connect

    KOCH, M.R.

    1999-11-09

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid.

  3. Enraf series 854 Advanced Technology Gauge (ATG) acceptance test procedure. Revision 3

    SciTech Connect

    Barnes, G.A.

    1995-05-08

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer`s instructions and specifications and is properly setup prior to being delivered to the tank farm area.

  4. 46 CFR 160.062-8 - Procedures for acceptance of testing facility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Procedures for acceptance of testing facility. 160.062-8 Section 160.062-8 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Releases. Lifesaving Equipment, Hydraulic and Manual § 160.062-8...

  5. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU II card for Leak Detector Use Acceptance Test Procedure

    SciTech Connect

    SMITH, S.G.

    1999-10-21

    The following Acceptance Test Procedure was written to test the ENRAF series 854 ATG with SPU II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and alarms functionality.

  6. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-03-29

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  7. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  8. Acceptance test procedure, 241-SY-101/241-C-106 shot loading system

    SciTech Connect

    Ostrom, M.J.

    1994-11-01

    This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations.

  9. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    SciTech Connect

    Creed, R.F.

    1996-03-11

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment`s ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020.

  10. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    SciTech Connect

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  11. Tank Monitor and Control System sensor acceptance test procedure. Revision 5

    SciTech Connect

    Scaief, C.C. III

    1994-09-26

    The purpose of this acceptance test procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Engraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic. The TMACS has been designed in response to recommendations from the Defense Nuclear Facilities Safety Board primarily for improved monitoring of waste tank temperatures. The system has been designed with the capability to monitor other types of sensor input as well.

  12. Acceptance/operational test procedure 241-AN-107 Video Camera System

    SciTech Connect

    Pedersen, L.T.

    1994-11-18

    This procedure will document the satisfactory operation of the 241-AN-107 Video Camera System. The camera assembly, including camera mast, pan-and-tilt unit, camera, and lights, will be installed in Tank 241-AN-107 to monitor activities during the Caustic Addition Project. The camera focus, zoom, and iris remote controls will be functionally tested. The resolution and color rendition of the camera will be verified using standard reference charts. The pan-and-tilt unit will be tested for required ranges of motion, and the camera lights will be functionally tested. The master control station equipment, including the monitor, VCRs, printer, character generator, and video micrometer will be set up and performance tested in accordance with original equipment manufacturer`s specifications. The accuracy of the video micrometer to measure objects in the range of 0.25 inches to 67 inches will be verified. The gas drying distribution system will be tested to ensure that a drying gas can be flowed over the camera and lens in the event that condensation forms on these components. This test will be performed by attaching the gas input connector, located in the upper junction box, to a pressurized gas supply and verifying that the check valve, located in the camera housing, opens to exhaust the compressed gas. The 241-AN-107 camera system will also be tested to assure acceptable resolution of the camera imaging components utilizing the camera system lights.

  13. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    SciTech Connect

    WHITE, D.A.

    2000-03-01

    Shop Test of the Gamma Cart System to be used in the AZ-101 Mixer Pump Demonstration Test. Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including: depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software.

  14. Thermocouple module halt failure acceptance test procedure for Tank 241-SY-101 DACS-1

    SciTech Connect

    Ermi, A.M.

    1997-12-09

    The readiness of the Tank 241-SY-101 Data Acquisition and Control System (DACS-1) to provide monitoring and alarms for a halt failure of any thermocouple module will be tested during the performance of this procedure. Updated DACS-1 ``1/0 MODULE HEALTH STATUS``, ``MININ1``, and ``MININ2`` screens, which now provide indication of thermocouple module failure, will also be tested as part of this procedure.

  15. 241-AN-A pit leak detection ANA-WT-LDSTA-331 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  16. SN-268 encasement leak detection ANA-WT-LDSTA-335 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for encasement leak detector system installed in 241-AN-A Encasement Line SN-268, located at 200E Tank Farms. This procedure provides instructions for demonstrating that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  17. 241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  18. CENRTC Project No. 2F3EOA, OCB A-372, acceptance test procedure

    SciTech Connect

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC No. 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00038/M (CENRTC 2F3EOA MWTT OCB A-372 PACKAGE).

  19. Cone penetrometer acceptance test report

    SciTech Connect

    Boechler, G.N.

    1996-09-19

    This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP section that satisfied the specification.

  20. 241-AN-B valve pit manifold valves and position indication acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-B Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.

  1. 241-AN-A valve pit manifold valves and position indication acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-A Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.

  2. 105KE Basin Area Radiation Monitor System (ARMS) Acceptance Test Procedure

    SciTech Connect

    KINKEL, C.C.

    1999-12-14

    This procedure is intended for the Area Radiation Monitoring System, ARMS, that is replacing the existing Programmable Input-Output Processing System, PIOPS, radiation monitoring system in the 105KE basin. The new system will be referred to as the 105KE ARMS, 105KE Area Radiation Monitoring System. This ATP will ensure calibration integrity of the 105KE radiation detector loops. Also, this ATP will test and document the display, printing, alarm output, alarm acknowledgement, upscale check, and security functions. This ATP test is to be performed after completion of the 105KE ARMS installation. The alarm outputs of the 105KE ARMS will be connected to the basin detector alarms, basin annunciator system, and security Alarm Monitoring System, AMS, located in the 200 area Central Alarm Station (CAS).

  3. Human Factors Process Task Analysis Liquid Oxygen Pump Acceptance Test Procedure for the Advanced Technology Development Center

    NASA Technical Reports Server (NTRS)

    Diorio, Kimberly A.

    2002-01-01

    A process task analysis effort was undertaken by Dynacs Inc. commencing in June 2002 under contract from NASA YA-D6. Funding was provided through NASA's Ames Research Center (ARC), Code M/HQ, and Industrial Engineering and Safety (IES). The John F. Kennedy Space Center (KSC) Engineering Development Contract (EDC) Task Order was 5SMA768. The scope of the effort was to conduct a Human Factors Process Failure Modes and Effects Analysis (HF PFMEA) of a hazardous activity and provide recommendations to eliminate or reduce the effects of errors caused by human factors. The Liquid Oxygen (LOX) Pump Acceptance Test Procedure (ATP) was selected for this analysis. The HF PFMEA table (see appendix A) provides an analysis of six major categories evaluated for this study. These categories include Personnel Certification, Test Procedure Format, Test Procedure Safety Controls, Test Article Data, Instrumentation, and Voice Communication. For each specific requirement listed in appendix A, the following topics were addressed: Requirement, Potential Human Error, Performance-Shaping Factors, Potential Effects of the Error, Barriers and Controls, Risk Priority Numbers, and Recommended Actions. This report summarizes findings and gives recommendations as determined by the data contained in appendix A. It also includes a discussion of technology barriers and challenges to performing task analyses, as well as lessons learned. The HF PFMEA table in appendix A recommends the use of accepted and required safety criteria in order to reduce the risk of human error. The items with the highest risk priority numbers should receive the greatest amount of consideration. Implementation of the recommendations will result in a safer operation for all personnel.

  4. 241-SY-101 DACS instrument problem screen (SCR 448) acceptance test procedure

    SciTech Connect

    ERMI, A.M.

    1999-06-28

    The operability of the 241-SY-101 Data Acquisition and Control System (DACS) to provide proper control and monitoring of the mitigation mixer pump and instrumentation installed in the 241-SY-101 underground storage tank utilizing the [INSTPROB] screen will be systematically evaluated by the performance of this procedure.

  5. ATLAS ACCEPTANCE TEST

    SciTech Connect

    J.C. COCHRANE; J.V. PARKER; ET AL

    2001-06-01

    The acceptance test program for Atlas, a 23 MJ pulsed power facility for use in the Los Alamos High Energy Density Hydrodynamics program, has been completed. Completion of this program officially releases Atlas from the construction phase and readies it for experiments. Details of the acceptance test program results and of machine capabilities for experiments will be presented.

  6. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  7. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  8. UGV acceptance testing

    NASA Astrophysics Data System (ADS)

    Kramer, Jeffrey A.; Murphy, Robin R.

    2006-05-01

    With over 100 models of unmanned vehicles now available for military and civilian safety, security or rescue applications, it is important to for agencies to establish acceptance testing. However, there appears to be no general guidelines for what constitutes a reasonable acceptance test. This paper describes i) a preliminary method for acceptance testing by a customer of the mechanical and electrical components of an unmanned ground vehicle system, ii) how it has been applied to a man-packable micro-robot, and iii) discusses the value of testing both to ensure that the customer has a workable system and to improve design. The test method automated the operation of the robot to repeatedly exercise all aspects and combinations of components on the robot for 6 hours. The acceptance testing process uncovered many failures consistent with those shown to occur in the field, showing that testing by the user does predict failures. The process also demonstrated that the testing by the manufacturer can provide important design data that can be used to identify, diagnose, and prevent long-term problems. Also, the structured testing environment showed that sensor systems can be used to predict errors and changes in performance, as well as uncovering unmodeled behavior in subsystems.

  9. Acceptance test procedure bldg. 271-U remote monitoring of project W-059 B-Plant canyon exhaust system

    SciTech Connect

    MCDANIEL, K.S.

    1999-09-01

    The test procedure provides for verifying indications and alarms The test procedure provides for verifying indications and alarms associated with the B Plant Canyon Ventilation System as they are being displayed on a remote monitoring workstation located in building 271-U. The system application software was installed by PLCS Plus under contract from B&W Hanford Company. The application software was installed on an existing operator workstation in building 271U which is owned and operated by Bechtel Hanford Inc.

  10. Human Factors Process Task Analysis: Liquid Oxygen Pump Acceptance Test Procedure at the Advanced Technology Development Center

    NASA Technical Reports Server (NTRS)

    Diorio, Kimberly A.; Voska, Ned (Technical Monitor)

    2002-01-01

    This viewgraph presentation provides information on Human Factors Process Failure Modes and Effects Analysis (HF PFMEA). HF PFMEA includes the following 10 steps: Describe mission; Define System; Identify human-machine; List human actions; Identify potential errors; Identify factors that effect error; Determine likelihood of error; Determine potential effects of errors; Evaluate risk; Generate solutions (manage error). The presentation also describes how this analysis was applied to a liquid oxygen pump acceptance test.

  11. Optimizing surface quality of stainless alloys and using a modified ASTM G 48B procedure for acceptance testing

    SciTech Connect

    Maurer, J.R.

    1999-01-01

    The formation of high-temperature oxide scales and Cr-depleted zones on stainless alloys, such as 6% Mo superaustenitic steels, can significantly reduce their corrosion resistance. Effective methods to remove these layers and restore the surface to an optimized condition are detailed. Also, an acceptance test using a modified ASTM G 48B method at 35 C (95 F) for 72 h with a specimen having a crevice, and special corrosion criteria for failure, are described. Comparison of this test method with one using an uncreviced specimen at lower temperatures and for less time is discussed.

  12. Acceptance and operational test procedure for neutron and gamma probe application to tank 241-SY-101 MITs

    SciTech Connect

    CANNON, N.S.

    1999-06-02

    This ATP/OTP provides procedures for testing to be performed to verify that newly procured neutron and gamma probes (reduced diameter design modifications) for operation in the Tank 241-SY-101 MlTs are compatible with existing LOW van instrumentation and hardware. A set of moisture data versus elevation will be obtained from the Tank 241-SY-101 MITs, and (optionally) from the Tank 241-AX-I01 LOW as part of this testing program.

  13. Environmental Test Screening Procedure

    NASA Technical Reports Server (NTRS)

    Zeidler, Janet

    2000-01-01

    This procedure describes the methods to be used for environmental stress screening (ESS) of the Lightning Mapper Sensor (LMS) lens assembly. Unless otherwise specified, the procedures shall be completed in the order listed, prior to performance of the Acceptance Test Procedure (ATP). The first unit, S/N 001, will be subjected to the Qualification Vibration Levels, while the remainder will be tested at the Operational Level. Prior to ESS, all units will undergo Pre-ESS Functional Testing that includes measuring the on-axis and plus or minus 0.95 full field Modulation Transfer Function and Back Focal Length. Next, all units will undergo ESS testing, and then Acceptance testing per PR 460.

  14. Improving Acceptance of Automated Counseling Procedures.

    ERIC Educational Resources Information Center

    Johnson, James H.; And Others

    This paper discusses factors that may influence the acceptance of automated counseling procedures by the military. A consensual model of the change process is presented which structures organizational readiness, the change strategy, and acceptance as integrated variables to be considered in a successful installation. A basic introduction to the…

  15. Acceptance/operational test procedure 101-AW tank camera purge system and 101-AW video camera system

    SciTech Connect

    Castleberry, J.L.

    1994-09-19

    This procedure will document the satisfactory operation of the 101-AW Tank Camera Purge System (CPS) and the 101-AW Video Camera System. The safety interlock which shuts down all the electronics inside the 101-AW vapor space, during loss of purge pressure, will be in place and tested to ensure reliable performance. This procedure is separated into four sections. Section 6.1 is performed in the 306 building prior to delivery to the 200 East Tank Farms and involves leak checking all fittings on the 101-AW Purge Panel for leakage using a Snoop solution and resolving the leakage. Section 7.1 verifies that PR-1, the regulator which maintains a positive pressure within the volume (cameras and pneumatic lines), is properly set. In addition the green light (PRESSURIZED) (located on the Purge Control Panel) is verified to turn on above 10 in. w.g. and after the time delay (TDR) has timed out. Section 7.2 verifies that the purge cycle functions properly, the red light (PURGE ON) comes on, and that the correct flowrate is obtained to meet the requirements of the National Fire Protection Association. Section 7.3 verifies that the pan and tilt, camera, associated controls and components operate correctly. This section also verifies that the safety interlock system operates correctly during loss of purge pressure. During the loss of purge operation the illumination of the amber light (PURGE FAILED) will be verified.

  16. L-286 Acceptance Test Record

    SciTech Connect

    HARMON, B.C.

    2000-01-14

    This document provides a detailed account of how the acceptance testing was conducted for Project L-286, ''200E Area Sanitary Water Plant Effluent Stream Reduction''. The testing of the L-286 instrumentation system was conducted under the direct supervision

  17. 40 CFR Appendix Xv to Part 86 - Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... freedom. 6. If (Aprop)1/2 ≥ tp / ts × (Bstd)1/2 the proposed plan is acceptable. Table I to Appendix XV... Periodically Regenerating Trap Oxidizer Systems Certifying to the Provisions of Part 86, Subpart R XV Appendix XV to Part 86 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...

  18. 40 CFR Appendix Xv to Part 86 - Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... freedom. 6. If (Aprop)1/2 ≥ tp / ts × (Bstd)1/2 the proposed plan is acceptable. Table I to Appendix XV... Periodically Regenerating Trap Oxidizer Systems Certifying to the Provisions of Part 86, Subpart R XV Appendix XV to Part 86 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...

  19. Nitrogen trailer acceptance test report

    SciTech Connect

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0249. The equipment was tested according to WHC-SD-WM-ATP-108 Rev.0. The equipment being tested is a portable contained nitrogen supply. The test was conducted at Norco`s facility.

  20. 40 CFR Appendix Xv to Part 86 - Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 5,000, 25,000, 50,000, 75,000, and 100,000 miles will be designated as the standard (std) test... = [∑(Xs)2 − ((∑Xs)2 / Ns))std Where: Xs = Individual mileages at which the vehicle will be tested. Ns... to table I and determine tp at (Np − 2)prop degrees of freedom and ts at (Ns − 2)std degrees...

  1. 40 CFR Appendix Xv to Part 86 - Procedure for Determining an Acceptable Exhaust Regeneration Durability-Data Test Schedule for...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 5,000, 25,000, 50,000, 75,000, and 100,000 miles will be designated as the standard (std) test... = [∑(Xs)2 − ((∑Xs)2 / Ns))std Where: Xs = Individual mileages at which the vehicle will be tested. Ns... to table I and determine tp at (Np − 2)prop degrees of freedom and ts at (Ns − 2)std degrees...

  2. Acceptance test report 2721-Z upgrades

    SciTech Connect

    Keck, R.D.

    1998-02-03

    This test procedure provides instructions for acceptance testing of modifications to the 2721-Z diesel-generator system made by Project C-189. The modifications include (1) replacing the generator NUMA-LOGIC controller with connection to the PFP distributed control system (DCS), (2) replacing ATSI with a breaker switching scheme for 2736-ZB backup power and (3) providing a method for generator load and system testing.

  3. From requirements to acceptance tests

    NASA Technical Reports Server (NTRS)

    Baize, Lionel; Pasquier, Helene

    1993-01-01

    From user requirements definition to accepted software system, the software project management wants to be sure that the system will meet the requirements. For the development of a telecommunication satellites Control Centre, C.N.E.S. has used new rules to make the use of tracing matrix easier. From Requirements to Acceptance Tests, each item of a document must have an identifier. A unique matrix traces the system and allows the tracking of the consequences of a change in the requirements. A tool has been developed, to import documents into a relational data base. Each record of the data base corresponds to an item of a document, the access key is the item identifier. Tracing matrix is also processed, providing automatically links between the different documents. It enables the reading on the same screen of traced items. For example one can read simultaneously the User Requirements items, the corresponding Software Requirements items and the Acceptance Tests.

  4. TMACS Test Procedure TP007: System administration

    SciTech Connect

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-05-24

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions.

  5. Procedures and acceptance criteria for PAS-1 cask inspections

    SciTech Connect

    Mercado, J.E.

    1998-09-09

    The procedures and acceptance criteria that comprise this document were prepared to support a one-time test to certify two PAS-1 casks in accordance with US Department of Energy Certificate of Compliance US A/9184/B(U), which was issued in 1998. The specific inspections addressed in this document are the visual weld inspection and a dimensional inspection of the primary containment vessel.

  6. Emperical Tests of Acceptance Sampling Plans

    NASA Technical Reports Server (NTRS)

    White, K. Preston, Jr.; Johnson, Kenneth L.

    2012-01-01

    Acceptance sampling is a quality control procedure applied as an alternative to 100% inspection. A random sample of items is drawn from a lot to determine the fraction of items which have a required quality characteristic. Both the number of items to be inspected and the criterion for determining conformance of the lot to the requirement are given by an appropriate sampling plan with specified risks of Type I and Type II sampling errors. In this paper, we present the results of empirical tests of the accuracy of selected sampling plans reported in the literature. These plans are for measureable quality characteristics which are known have either binomial, exponential, normal, gamma, Weibull, inverse Gaussian, or Poisson distributions. In the main, results support the accepted wisdom that variables acceptance plans are superior to attributes (binomial) acceptance plans, in the sense that these provide comparable protection against risks at reduced sampling cost. For the Gaussian and Weibull plans, however, there are ranges of the shape parameters for which the required sample sizes are in fact larger than the corresponding attributes plans, dramatically so for instances of large skew. Tests further confirm that the published inverse-Gaussian (IG) plan is flawed, as reported by White and Johnson (2011).

  7. 14 CFR Appendix F to Part 23 - Test Procedure

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Test Procedure F Appendix F to Part 23...—Test Procedure Part I—Acceptable Test Procedure for Self-Extinguishing Materials for Showing Compliance With §§ 23.853, 23.855, and 23.1359 Acceptable test procedure for self-extinguishing materials...

  8. Acceptance testing prone stereotactic breast biopsy units.

    PubMed

    Kimme-Smith, C; Solberg, T

    1994-07-01

    When the Mammography Quality Standards Act becomes law in October, 1994, stereotactic breast biopsy units may require yearly physicist calibration. Upright stereotactic units can be easily tested using conventional mammography procedures and a gelatin phantom containing simulated calcifications, but prone units are difficult to assess because of the under-table tube configuration. The two current manufacturers of these units have made different design decisions which affect each unit's calibration. There are a number of important distinctions between screening and prone biopsy units. For the two currently available prone units, a pronounced heel effect makes ion chamber position critical. Focal spot measurements are particularly difficult on one unit because there is no light field. The fixed grid on the other unit must be tested with a flood film. Physicists who inspect these units before their clinical use should be aware of variations needed by this equipment for specific acceptance tests. PMID:7968854

  9. PUREX SAMCONS uninterruptible power supply (UPS) acceptance test report

    SciTech Connect

    Blackaby, W.B.

    1997-10-07

    This Acceptance Test Report for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) Acceptance Test Procedure validates the operation of the UPS, all alarming and display functions and the ability of the UPS to supply power to the SAMCONS as designed. The proper installation of the PUREX SAMCONS Trailer UPS components and wiring will be systematically evaluated by performance of this procedure. Proper operation of the SAMCONS computer UPS will be verified by performance of a timed functional load test, and verification of associated alarms and trouble indications. This test procedure will be performed in the SAMCONS Trailer and will include verification of receipt of alarms at the SAMCONS computer stations. This test may be performed at any time after the completion of HNF-SD-CP-ATP-083, PUREX Surveillance and Monitoring and Control System (SAMCONS) Acceptance Test Procedure, when computer display and alarm functions have been proven to operate correctly.

  10. Toddler test or procedure preparation

    MedlinePlus

    Preparing toddler for test/procedure; Test/procedure preparation - toddler; Preparing for a medical test or procedure - toddler ... Before the test, know that your child will probably cry. Even if you prepare, your child may feel some discomfort or ...

  11. Toddler test or procedure preparation

    MedlinePlus

    ... procedure; Test/procedure preparation - toddler; Preparing for a medical test or procedure - toddler ... A, Franz BE. Practical communication guide for paediatric procedures. Emerg ... PMID: 19588390 www.ncbi.nlm.nih.gov/pubmed/19588390 .

  12. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    SciTech Connect

    NNSA /NSO Waste Management Project

    2008-06-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

  13. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect

    U.S. Department of Energy, Nevada Operations Office, Waste Acceptance Criteria

    1999-05-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the Nevada Test Site.

  14. Preschooler test or procedure preparation

    MedlinePlus

    Preparing preschoolers for test/procedure; Test/procedure preparation - preschooler ... Preparing children for medical tests can reduce their distress. It can also make them less likely to cry and resist the procedure. Research shows that ...

  15. ASME PTC 46 -- Acceptance test code for overall plant performance

    SciTech Connect

    Friedman, J.R.; Yost, J.G.

    1999-11-01

    ASME published PTC 46 in 1996 after five years of development. PTC 46 is the first industry standard providing explicit procedures for conducting acceptance tests to determine the overall thermal performance and output of power generating units. It is applicable to any heat cycle power generating unit. This survey paper provides an overview of PTC 46 and discusses how PTC 46 can be used for acceptance testing of new combined cycle and fossil steam power generating units. Several technical papers have been previously presented that provide more detailed information and discussion on the use of PTC 46 in acceptance testing.

  16. Acceptance Test Plan for ANSYS Software

    SciTech Connect

    CREA, B.A.

    2000-10-25

    This plan governs the acceptance testing of the ANSYS software (Full Mechanical Release 5.5) for use on Project Word Management Contract (PHMC) computer systems (either UNIX or Microsoft Windows/NT). There are two phases to the acceptance testing covered by this test plan: program execution in accordance with the guidance provided in installation manuals; and ensuring results of the execution are consistent with the expected physical behavior of the system being modeled.

  17. Generator acceptance test and inspection report

    SciTech Connect

    Johns, B.R.

    1997-07-24

    This Acceptance Test Report(ATR) is the completed testing and inspection of the new portable generator. The testing and inspection is to verify that the generator provided by the vendor meets the requirements of specification WHC-S-0252, Revision 2. Attached is various other documentation to support the inspection and testing.

  18. Light duty utility arm phase 2 qualification test procedure

    SciTech Connect

    Barnes, G.A.

    1997-01-16

    This Acceptance Test Procedure (ATP) will test and verify that the Exhauster meets the specified functional requirements, safety requirements, operating requirements, and provide a record of the functional test results. The system/functions that will be tested are listed in the scope section of the Acceptance Test Procedure.

  19. Acceptance test report, plutonium finishing plant life safety upgrade

    SciTech Connect

    Hodge, S.G.

    1994-12-02

    This acceptance Test Procedure (ATP) has been prepared to demonstrate that modifications to the Fir Protection systems function as required by project criteria. The ATP will test the Fire Alarm Control Panels, Flow Alarm Pressure Switch, Heat Detectors, Smoke Detectors, Flow Switches, Manual Pull Stations, and Gong/Door By Pass Switches.

  20. Gas characterization system software acceptance test report

    SciTech Connect

    Vo, C.V.

    1996-03-28

    This document details the results of software acceptance testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  1. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA

    SciTech Connect

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION, NEVADA SITE OFFICE

    2005-07-01

    This document establishes the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal. Mixed waste generated within the State of Nevada by NNSA/NSO activities is accepted for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Site for storage or disposal.

  2. Procedural justice in children: Preschoolers accept unequal resource distributions if the procedure provides equal opportunities.

    PubMed

    Grocke, Patricia; Rossano, Federico; Tomasello, Michael

    2015-12-01

    When it is not possible to distribute resources equitably to everyone, people look for an equitable or just procedure. In the current study, we investigated young children's sense of procedural justice. We tested 32 triads of 5-year-olds in a new resource allocation game. Triads were confronted with three unequal reward packages and then agreed on a procedure to allocate them among themselves. To allocate the rewards, they needed to use a "wheel of fortune." Half of the groups played with a fair wheel (where each child had an equal chance of obtaining each reward package), and the other half played with an unfair wheel. We analyzed children's interactions when using the wheel and conducted an interview with each child after the game was over. Children using the unfair wheel often decided to change the rules of the game, and they also rated it as an unfair procedure in the interview. In contrast, children who played with the fair wheel were mostly accepting of both the outcome and the procedure. Overall, we found that children as young as preschool age are already sensitive not only to distributive justice but to procedural justice as well. PMID:26255603

  3. W-026, transuranic waste (TRU) glovebox acceptance test report

    SciTech Connect

    Leist, K.J.

    1998-03-11

    On July 18, 1997, the Transuranic (TRU) glovebox was tested using glovebox acceptance test procedure 13021A-86. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, sorting table, lidder/delidder device and the TRU empty drum compactor were also conducted. As of February 25, 1998, 10 of the 102 test exceptions that affect the TRU glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test exceptions are provided as appendices to this report.

  4. WRAP low level waste (LLW) glovebox acceptance test report

    SciTech Connect

    Leist, K.J.

    1998-02-17

    In June 28, 1997, the Low Level Waste (LLW) glovebox was tested using glovebox acceptance test procedure 13031A-85. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, lidder/delidder device and the supercompactor were also conducted. As of November 24, 1997, 2 of the 131 test exceptions that affect the LLW glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test Exceptions are provided as appendices to this report.

  5. 46 CFR 164.015-5 - Procedure for acceptance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Plastic Foam, Unicellular, Buoyant, Sheet and Molded Shape § 164.015-5 Procedure for acceptance. (a) Unicellular plastic foam is not subject to formal approval, but will be... unicellular plastic foam prior to being incorporated into finished products, or during the course...

  6. 46 CFR 164.015-5 - Procedure for acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Plastic Foam, Unicellular, Buoyant, Sheet and Molded Shape § 164.015-5 Procedure for acceptance. (a) Unicellular plastic foam is not subject to formal approval, but will be... unicellular plastic foam prior to being incorporated into finished products, or during the course...

  7. 46 CFR 164.015-5 - Procedure for acceptance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Plastic Foam, Unicellular, Buoyant, Sheet and Molded Shape § 164.015-5 Procedure for acceptance. (a) Unicellular plastic foam is not subject to formal approval, but will be... unicellular plastic foam prior to being incorporated into finished products, or during the course...

  8. 46 CFR 164.015-5 - Procedure for acceptance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Plastic Foam, Unicellular, Buoyant, Sheet and Molded Shape § 164.015-5 Procedure for acceptance. (a) Unicellular plastic foam is not subject to formal approval, but will be... unicellular plastic foam prior to being incorporated into finished products, or during the course...

  9. 46 CFR 164.015-5 - Procedure for acceptance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: SPECIFICATIONS AND APPROVAL MATERIALS Plastic Foam, Unicellular, Buoyant, Sheet and Molded Shape § 164.015-5 Procedure for acceptance. (a) Unicellular plastic foam is not subject to formal approval, but will be... unicellular plastic foam prior to being incorporated into finished products, or during the course...

  10. 16 CFR 1616.4 - Sampling and acceptance procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Sampling and acceptance procedures. 1616.4 Section 1616.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FLAMMABLE FABRICS ACT REGULATIONS STANDARD FOR THE FLAMMABILITY OF CHILDREN'S SLEEPWEAR: SIZES 7 THROUGH 14 (FF 5-74) The Standard §...

  11. 16 CFR 1616.4 - Sampling and acceptance procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Sampling and acceptance procedures. 1616.4 Section 1616.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FLAMMABLE FABRICS ACT REGULATIONS STANDARD FOR THE FLAMMABILITY OF CHILDREN'S SLEEPWEAR: SIZES 7 THROUGH 14 (FF 5-74) The Standard §...

  12. Acceptance test report for the Westinghouse 100 ton hydraulic trailer

    SciTech Connect

    Barrett, R.A.

    1995-03-06

    The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP`s facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson`s facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified.

  13. Breathing air trailer acceptance test report

    SciTech Connect

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0251, Rev.0 and ECNs 613530 and 606113. The equipment was tested according to WHC-SD-WM-ATP-104. The equipment tested is a Breathing Air Supply Trailer purchased as a design and fabrication procurement activity. The ATP was written by the Seller and was performed by the Seller with representatives of the Westinghouse Hanford Company witnessing portions of the test at the Seller`s location.

  14. Induction graphitizing furnace acceptance test report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The induction furnace was designed to provide the controlled temperature and environment required for the post-cure, carbonization and graphitization processes for the fabrication of a fibrous graphite NERVA nozzle extension. The acceptance testing required six tests and a total operating time of 298 hrs. Low temperature mode operations, 120 to 850 C, were completed in one test run. High temperature mode operations, 120 to 2750 C, were completed during five tests.

  15. Acceptance test report: Backup power system

    SciTech Connect

    Cole, D.B.

    1996-01-26

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control.

  16. Acceptance test report MICON software exhaust fan control

    SciTech Connect

    Keck, R.D.

    1998-06-12

    This test procedure specifies instructions for acceptance testing of software for exhaust fan control under Project ESPT (Energy Savings Performance Contract). The software controls the operation of two emergency exhaust fans when there is a power failure. This report details the results of acceptance testing for the MICON software upgrades. One of the modifications is that only one of the emergency fans will operate at all times. If the operating fan shuts off or fails, the other fan will start and the operating fan will be stopped.

  17. User Acceptance of YouTube for Procedural Learning: An Extension of the Technology Acceptance Model

    ERIC Educational Resources Information Center

    Lee, Doo Young; Lehto, Mark R.

    2013-01-01

    The present study was framed using the Technology Acceptance Model (TAM) to identify determinants affecting behavioral intention to use YouTube. Most importantly, this research emphasizes the motives for using YouTube, which is notable given its extrinsic task goal of being used for procedural learning tasks. Our conceptual framework included two…

  18. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    SciTech Connect

    THOMAS, W.K.

    2000-01-10

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field.

  19. Retained gas sampler system acceptance test report

    SciTech Connect

    Cannon, N.S., Westinghouse Hanford

    1996-07-18

    Acceptance test results for the Retained Gas Sampler System (RGSS) obtained in the 306E laboratory are reported. The RGSS will be utilized to retrieve and analyze samples from the Hanford flammable gas watch-list tanks to determine the quantity and chemistry of gases confined within the waste.

  20. 14 CFR Appendix F to Part 23 - Test Procedure

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... test. The specimens must be exposed to a Bunsen or Tirrill burner with a nominal 3/8 inch I.D. tube... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Test Procedure F Appendix F to Part 23...—Test Procedure Acceptable test procedure for self-extinguishing materials for showing compliance...

  1. 14 CFR Appendix F to Part 23 - Test Procedure

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Test Procedure F Appendix F to Part 23...—Test Procedure Acceptable test procedure for self-extinguishing materials for showing compliance with... as sandwich panels, may not be separated for a test. The specimen thickness must be no thicker...

  2. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect

    U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-10-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  3. Rotary mode core sampling service trailer Acceptance Test Plan

    SciTech Connect

    Kostelnik, A.J.

    1994-11-28

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of specification WHC-S-056 Rev.2 including ECNs 608798 and 616386. The equipment being tested is a furniture type trailer with storage cabinets, lighting and HVAC systems installed. The unit was purchased as a Design and Fabrication procurement activity. The ATP be performed by representatives of the Westinghouse Hanford Company with the assistance of the Seller at the Seller`s location.

  4. Thermocouple module halt acceptance test report for tank 241-SY-101 DACS-1

    SciTech Connect

    Larsen, D.C.

    1998-03-10

    Testing was started on February 24, 1998 and completed on February 25, 1998. The completed procedure consists of 4 acceptance test sections, 6.1 through 6.4. Three test exceptions were identified during the procedure. The first test exception was determined to be unrelated to the ATP and unfortunate that the instrument failed during the ATP. The next two test exceptions were disposition as acceptable because the alarming functions worked correctly in identifying a problem when software communications were interrupted. The test was completed satisfactorily over 2 days. The remainder of the acceptance test report is the completed test procedure.

  5. W-026, acceptance test report manipulator system

    SciTech Connect

    Watson, T.L.

    1997-04-15

    The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests.

  6. 105K West Isolation Barrier Acceptance Test results

    SciTech Connect

    McCracken, K.J.; Irwin, J.J.

    1995-05-18

    The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KW/100K. The tests were performed in accordance with the test plan and acceptance test procedure. The test report contains the test data. This document compares the test data against the criteria. A discussion of the leak rate analytical characterization describes how the flow characteristics flow rate will be determined using the test data from the test report. Two modes of water loss were considered; basin and/or discharge chute leakage, and evaporation. An initial test established baseline leakage data and instrumentation performance. Test 2 evaluated the sealing performance of the isolation barrier by inducing an 11 in. (27.9 cm) level differential across the barrier. The leak rate at this 11 in. (27.9 cm) level is extrapolated to the 16 ft. (4.9 m) level differential postulated in the DBE post seismic event. If the leak rate, adjusted for evaporation and basin leakage (determined from Test 1), is less than the SAR limit of 1,500 gph (5,680 lph) at a 16 ft (4.9 m) level differential, the barriers pass the acceptance test.

  7. Acceptability of Flight Deck-Based Interval Management Crew Procedures

    NASA Technical Reports Server (NTRS)

    Murdock, Jennifer L.; Wilson, Sara R.; Hubbs, Clay E.; Smail, James W.

    2013-01-01

    The Interval Management for Near-term Operations Validation of Acceptability (IM-NOVA) experiment was conducted at the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) in support of the NASA Next Generation Air Transportation System (NextGen) Airspace Systems Program's Air Traffic Management Technology Demonstration - 1 (ATD-1). ATD-1 is intended to showcase an integrated set of technologies that provide an efficient arrival solution for managing aircraft using NextGen surveillance, navigation, procedures, and automation for both airborne and ground-based systems. The goal of the IM-NOVA experiment was to assess if procedures outlined by the ATD-1 Concept of Operations, when used with a minimum set of Flight deck-based Interval Management (FIM) equipment and a prototype crew interface, were acceptable to and feasible for use by flight crews in a voice communications environment. To investigate an integrated arrival solution using ground-based air traffic control tools and aircraft automatic dependent surveillance broadcast (ADS-B) tools, the LaRC FIM system and the Traffic Management Advisor with Terminal Metering and Controller Managed Spacing tools developed at the NASA Ames Research Center (ARC) were integrated in LaRC's Air Traffic Operations Laboratory. Data were collected from 10 crews of current, qualified 757/767 pilots asked to fly a high-fidelity, fixed based simulator during scenarios conducted within an airspace environment modeled on the Dallas-Fort Worth (DFW) Terminal Radar Approach Control area. The aircraft simulator was equipped with the Airborne Spacing for Terminal Area Routes algorithm and a FIM crew interface consisting of electronic flight bags and ADS-B guidance displays. Researchers used "pseudo-pilot" stations to control 24 simulated aircraft that provided multiple air traffic flows into DFW, and recently retired DFW air traffic controllers served as confederate Center, Feeder, Final, and Tower

  8. TMACS test procedure TP010: Integration summary. Revision 6

    SciTech Connect

    Spurling, D.G.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed.

  9. Site acceptance test, W-030 MICON system

    SciTech Connect

    Hill, L.F., Westinghouse Hanford

    1996-06-10

    Monitoring and control of the W-030 ventilation upgrade is provided by a distributed control system (DCS) furnished by MICON Corporation. After shipment to the Hanford Site, the site acceptance test (SAT) for this system was conducted in a laboratory environment over a six month period, involving four distinct phases and numerous hardware and software modifications required to correct test exceptions. The final results is a system which is not fully compliant with procurement specifications but is determined to meet minimum Project W-030 safety and functional requirements. A negotiated settlement was reached with the supplier to establish a `path forward` for system implementation. This report documents the `as-run` status of the SAT. The SAT was completed in August of 1995. It was later followed by comprehensive acceptance testing of the W-030 control-logic configuration software; results are documented in WHC-SD-W030-ATR-011. Further testing is reported as part of process system startup operational testing, performed after the MICON installation.

  10. Guidelines for testing and release procedures

    NASA Technical Reports Server (NTRS)

    Molari, R.; Conway, M.

    1984-01-01

    Guidelines and procedures are recommended for the testing and release of the types of computer software efforts commonly performed at NASA/Ames Research Center. All recommendations are based on the premise that testing and release activities must be specifically selected for the environment, size, and purpose of each individual software project. Guidelines are presented for building a Test Plan and using formal Test Plan and Test Care Inspections on it. Frequent references are made to NASA/Ames Guidelines for Software Inspections. Guidelines are presented for selecting an Overall Test Approach and for each of the four main phases of testing: (1) Unit Testing of Components, (2) Integration Testing of Components, (3) System Integration Testing, and (4) Acceptance Testing. Tools used for testing are listed, including those available from operating systems used at Ames, specialized tools which can be developed, unit test drivers, stub module generators, and the use of format test reporting schemes.

  11. Nevada test site waste acceptance criteria

    SciTech Connect

    1996-09-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  12. STANDARDIZING BOOM TEST PROCEDURES

    EPA Science Inventory

    The OHMSETT Interagency Technical Committee (OTIC) sponsored a combined series of in-tank and open-water tests of five booms that cover a wide range of sizes and design parameters. The tests were conducted at the United States Environmental Protection Agency's OHMSETT facility an...

  13. Payload test philosophy. [JPL views on qualification/acceptance testing

    NASA Technical Reports Server (NTRS)

    Gindorf, T.

    1979-01-01

    The general philosophy of how JPL views payload qualification/acceptance testing for programs that are done either in-house or by contractors is described. Particular attention is given to mission risk classifications, preliminary critical design reviews, environmental design requirements, the thermal and dynamics development tests, and the flight spacecraft system test.

  14. Acceptance Test Plan for Fourth-Generation Corrosion Monitoring Cabinet

    SciTech Connect

    NORMAN, E.C.

    2000-10-23

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation.

  15. Acceptance testing of integrated picture archiving and communications systems.

    PubMed

    Lewis, T E; Horton, M C; Kinsey, T V; Shelton, P D

    1999-05-01

    An integrated picture archiving and communication system (PACS) is a large investment in both money and resources. With all of the components and systems contained in the PACS, a methodical set of protocols and procedures must be developed to test all aspects of the PACS within the short time allocated for contract compliance. For the Department of Defense (DoD), acceptance testing (AT) sets the protocols and procedures. Broken down into modules and test procedures that group like components and systems, the AT protocol maximizes the efficiency and thoroughness of testing all aspects of an integrated PACS. A standardized and methodical protocol reduces the probability of functionality or performance limitations being overlooked. The AT protocol allows complete PACS testing within the 30 days allocated by the digital imaging network (DIN)-PACS contract. AT shortcomings identified during the testing phase properly allows for resolution before complete acceptance of the system. This presentation will describe the evolution of the process, the components of the DoD AT protocol, the benefits of the AT process, and its significance to the successful implementation of a PACS. This is a US government work. There are no restrictions on its use. PMID:10342200

  16. 242A Distributed Control System Year 2000 Acceptance Test Report

    SciTech Connect

    TEATS, M.C.

    1999-08-31

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.

  17. Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer

    SciTech Connect

    ANDREWS, J.E.

    2000-01-27

    This document comprises the Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer. This document presents the results of Acceptance Testing of the 241-AZ-101 Ultrasonic Interface Level Analyzers (URSILLAs). Testing of the URSILLAs was performed in accordance with ATP-260-001, ''URSILLA Pre-installation Acceptance Test Procedure''. The objective of the testing was to verify that all equipment and components function in accordance with design specifications and original equipment manufacturer's specifications.

  18. Development of an acceptance test for solar energy systems

    NASA Astrophysics Data System (ADS)

    Joncich, D. M.; Johnson, D. L.

    1981-06-01

    This report describes the development and field evaluation of a short-duration procedure and an instrumentation package for testing whether a newly installed solar energy system is performing to design specifications. The U.S. Army Construction Engineering Research Laboratory: (1) defined a general solar system schematic and identified its major components; (2) developed test procedures for determining the thermal performance of these components; (3) bought and programmed equipment to perform the prescribed component test and to produce the test data; (4) subjected the acceptance test concept and instrumentation package to a field evaluation at a newly installed Army solar energy system; and (5) incorporated the results of the field evaluation as modifications to the solar acceptance test. This report concludes that a simple, quantitative test of short duration can determine whether a newly installed solar system is operating as specified. The results of the research have revealed the potential for performing such a test with low-cost metering installed at the time of building construction.

  19. Acceptance Test Report for 241-U compressed air system

    SciTech Connect

    Freeman, R.D.

    1994-10-20

    This Acceptance Test Report (ATR) documents the results of acceptance testing of a newly upgraded compressed air system at 241-U Farm. The system was installed and the test successfully performed under work package 2W-92-01027.

  20. MITG test procedure and results

    SciTech Connect

    Eck, M.B.; Mukunda, M.

    1983-01-01

    Elements and modules for Radioisotope Thermoelectric Generator have been performance tested since the inception of the RTG program. These test articles seldom resembled flight hardware and often lacked adequate diagnostic instrumentation. Because of this, performance problems were not identified in the early stage of program development. The lack of test data in an unexpected area often hampered the development of a problem solution. A procedure for conducting the MITG Test was developed in an effort to obtain data in a systematic, unambiguous manner. This procedure required the development of extensive data acquisition software and test automation. The development of a facility to implement the test procedure, the facility hardware and software requirements, and the results of the MITG testing are the subject of this paper.

  1. 46 CFR 159.010-19 - Termination of acceptance or recognition: Procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Termination of acceptance or recognition: Procedure. 159... Laboratory: Acceptance, Recognition, and Termination § 159.010-19 Termination of acceptance or recognition: Procedure. (a) If the Coast Guard receives evidence of grounds for termination of acceptance or...

  2. 46 CFR 159.010-19 - Termination of acceptance or recognition: Procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Termination of acceptance or recognition: Procedure. 159... Laboratory: Acceptance, Recognition, and Termination § 159.010-19 Termination of acceptance or recognition: Procedure. (a) If the Coast Guard receives evidence of grounds for termination of acceptance or...

  3. 46 CFR 159.010-19 - Termination of acceptance or recognition: Procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Termination of acceptance or recognition: Procedure. 159... Laboratory: Acceptance, Recognition, and Termination § 159.010-19 Termination of acceptance or recognition: Procedure. (a) If the Coast Guard receives evidence of grounds for termination of acceptance or...

  4. 46 CFR 159.010-19 - Termination of acceptance or recognition: Procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Termination of acceptance or recognition: Procedure. 159... Laboratory: Acceptance, Recognition, and Termination § 159.010-19 Termination of acceptance or recognition: Procedure. (a) If the Coast Guard receives evidence of grounds for termination of acceptance or...

  5. 46 CFR 159.010-19 - Termination of acceptance or recognition: Procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Termination of acceptance or recognition: Procedure. 159... Laboratory: Acceptance, Recognition, and Termination § 159.010-19 Termination of acceptance or recognition: Procedure. (a) If the Coast Guard receives evidence of grounds for termination of acceptance or...

  6. Adolescent test or procedure preparation

    MedlinePlus

    ... someone else) during the procedure Playing hand-held video games Using guided imagery Trying other distractions, such as ... effects the test may cause. Older adolescents may benefit from videos that show adolescents of the same ...

  7. 15 CFR 10.6 - Procedures for acceptance of a recommended standard.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Acceptance of not less than 60 percent by the producer segment, the distributor segment, and the user and... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Procedures for acceptance of a... PROCEDURES FOR THE DEVELOPMENT OF VOLUNTARY PRODUCT STANDARDS § 10.6 Procedures for acceptance of...

  8. 15 CFR 10.6 - Procedures for acceptance of a recommended standard.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Acceptance of not less than 60 percent by the producer segment, the distributor segment, and the user and... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Procedures for acceptance of a... PROCEDURES FOR THE DEVELOPMENT OF VOLUNTARY PRODUCT STANDARDS § 10.6 Procedures for acceptance of...

  9. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a... submitted for acceptance. (b) Identification testing. Manufacturers shall ensure that the...

  10. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a... submitted for acceptance. (b) Identification testing. Manufacturers shall ensure that the...

  11. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Test procedures. 1033.315 Section 1033... Programs § 1033.315 Test procedures. (a) Test procedures. Use the test procedures described in subpart F of this part, except as specified in this section. (1) You may ask to use other test procedures. We...

  12. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Test procedures. 1033.315 Section 1033... Programs § 1033.315 Test procedures. (a) Test procedures. Use the test procedures described in subpart F of this part, except as specified in this section. (1) You may ask to use other test procedures. We...

  13. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Test procedures. 1033.315 Section 1033... Programs § 1033.315 Test procedures. (a) Test procedures. Use the test procedures described in subpart F of this part, except as specified in this section. (1) You may ask to use other test procedures. We...

  14. 46 CFR 160.062-7 - Procedures for acceptance of repair facility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., Hydraulic and Manual § 160.062-7 Procedures for acceptance of repair facility. (a) Before a repair facility... 46 Shipping 6 2013-10-01 2013-10-01 false Procedures for acceptance of repair facility. 160.062-7... this section, the Commandant notifies the facility that— (1) It is an accepted repair facility for...

  15. 46 CFR 160.062-7 - Procedures for acceptance of repair facility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., Hydraulic and Manual § 160.062-7 Procedures for acceptance of repair facility. (a) Before a repair facility... 46 Shipping 6 2012-10-01 2012-10-01 false Procedures for acceptance of repair facility. 160.062-7... this section, the Commandant notifies the facility that— (1) It is an accepted repair facility for...

  16. 46 CFR 160.062-7 - Procedures for acceptance of repair facility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., Hydraulic and Manual § 160.062-7 Procedures for acceptance of repair facility. (a) Before a repair facility... 46 Shipping 6 2014-10-01 2014-10-01 false Procedures for acceptance of repair facility. 160.062-7... this section, the Commandant notifies the facility that— (1) It is an accepted repair facility for...

  17. 46 CFR 160.062-7 - Procedures for acceptance of repair facility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., Hydraulic and Manual § 160.062-7 Procedures for acceptance of repair facility. (a) Before a repair facility... 46 Shipping 6 2011-10-01 2011-10-01 false Procedures for acceptance of repair facility. 160.062-7... this section, the Commandant notifies the facility that— (1) It is an accepted repair facility for...

  18. The Murmansk Initiative - RF: Acceptance Testing

    SciTech Connect

    Czajkowski, C.; Wester, D. W.; Dyer, R. S.; Soerlie, A. A.; Moller, B.; Barnes, E.

    2002-02-26

    The Murmansk Initiative-RF (MI) was conceived to provide the Russian Federation (RF) with the capacity to manage low-level liquid radioactive waste (LLRW) and comply with the requirements of the London Convention that prohibit ocean dumping. The trilateral project among Norway, the RF, and the United States of America (U.S.) began in 1994 and was the first to utilize exclusively Russian subcontractors to upgrade and expand an existing LLRW treatment plant on the premises of RTP Atomflot in Murmansk, Russia. The project moved quickly through the design phase. Progress during the construction phase was somewhat slower because of difficulties with acquisition of hardware, inexperience with automated instrumentation and control equipment, and unexpected design changes in the cementation unit. The project advanced into the test-operation phase, which is currently underway, in June 2001. Initial runs with liquid waste have revealed that procedures for unloading spent ion-exchange sorbents could be improved and that sludges formed during removal of alkaline-earth metals should be compacted in order for the facility to operate at its full potential. Resolution of these issues is expected within the next few months.

  19. 16 CFR 1616.4 - Sampling and acceptance procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... consumer, provided such alternate sampling plans have operating characteristics such that the probability of unit acceptance at any percentage defective does not exceed the corresponding probability of unit... lies between 5 and 95 percent acceptance probability. Alternate sampling plans approved for...

  20. MCO Engineering Test Report Fuel Basket Handling Grapple Acceptance Test

    SciTech Connect

    CHENAULT, D.M.

    2000-01-06

    Acceptance testing of the production SNF Fuel Basket lift grapples to the required 150 percent maximum lift load is documented herein. The report shows the results affirming the proof test passage. The primary objective of this test was to confirm the load rating of the grapple per applicable requirements of ANSI 14 6 American National Standard For Radioactive Materials Special Lifting Devices for Shipping Containers Weighing 10,000 pounds (4500kg) or More. The above Standard requires a load test of 150% of the design load which must be held for a minimum of 10 minutes followed by a Liquid Penetrant or Magnetic Particle examination of critical areas and welds in accordance with the ANSI/ASME Boiler and Pressure Vessel Code 1989 Section 111 Division 1 section NF 5350.

  1. Acceptance Test Report for Fourth Generation Hanford Corrosion Monitoring System

    SciTech Connect

    NORMAN, E.C.

    2000-10-23

    This Acceptance Test Report (ATR) will document the satisfactory operation of the corrosion probe cabinets destined for installation on tanks 241-AN-102 and 241-AN-107. This ATR will be performed by the manufacturer on each cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinets to be installed on tanks 241-AN-102 and 241-AN-107. One cabinet will be installed on each tank. Each cabinet will contain corrosion monitoring hardware to be connected to existing corrosion probes already installed in each tank. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation (input a known signal and see if the instrumentation records the proper value).

  2. Acceptance test plan for fourth generation Hanford corrosion monitoring system

    SciTech Connect

    NORMAN, E.C.

    2000-07-27

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the corrosion probe cabinets destined for installation on tanks 241-AN-102 and 241-AN-107. This ATP will be performed by the manufacturer on each cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinets to be installed on tanks 241-AN-102 and 241-AN-107. One cabinet will be installed on each tank. Each cabinet will contain corrosion monitoring hardware to be connected to existing corrosion probes already installed in each tank. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation (input a known signal and see if the instrumentation records the proper value).

  3. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Acceptance tests. 164.023-11 Section 164.023-11 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Thread for Personal Flotation Devices § 164.023-11 Acceptance tests. (a) Performance testing. Manufacturers shall ensure that the performance tests described in § 164.023-7 (a) or...

  4. Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Empirical Testing. Volume 2

    NASA Technical Reports Server (NTRS)

    Johnson, Kenneth L.; White, K. Preston, Jr.

    2012-01-01

    The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. In this paper, the results of empirical tests intended to assess the accuracy of acceptance sampling plan calculators implemented for six variable distributions are presented.

  5. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT... EQUIPMENT Commercial Clothers Washers Test Procedures § 431.154 Test procedures. The test procedures for residential clothes washers in Appendix J1 to subpart B of part 430 of this title shall be used to...

  6. 40 CFR 89.508 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedures. 89.508 Section 89.508... Test procedures. (a)(1) For nonroad engines subject to the provisions of this subpart, the prescribed test procedures are the nonroad engine 8-mode test procedure as described in subpart E of this...

  7. 16 CFR 1616.4 - Sampling and acceptance procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... color or print pattern to be included in the unit. (3) Garments with different trim and findings may be... except for size, color, and print pattern. (4) For fabrics whose flammability characteristics are not... assure that the design characteristics of the garment are acceptable. Garment production units...

  8. Nevada Test Site Waste Acceptance Criteria, December 2000

    SciTech Connect

    2000-12-01

    This document establishes the US Department of Energy, Nevada Operations Office waste acceptance criteria. The waste acceptance criteria provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive waste and mixed waste for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Sites for storage or disposal.

  9. 14 CFR 151.123 - Procedures: Offer; amendment; acceptance; advance planning agreement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Procedures: Offer; amendment; acceptance; advance planning agreement. 151.123 Section 151.123 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Planning and Engineering Proposals § 151.123 Procedures: Offer; amendment; acceptance; advance...

  10. 14 CFR 151.123 - Procedures: Offer; amendment; acceptance; advance planning agreement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Procedures: Offer; amendment; acceptance; advance planning agreement. 151.123 Section 151.123 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Planning and Engineering Proposals § 151.123 Procedures: Offer; amendment; acceptance; advance...

  11. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS...) § 164.013-5 Acceptance tests. Manufacturers shall ensure that the performance and identification...

  12. 40 CFR 92.506 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 92.506 Section 92.506... and Audit Programs § 92.506 Test procedures. (a)(1) For locomotives and locomotive engines subject to the provisions of this subpart, the prescribed test procedures are those procedures described...

  13. Standard-B hydrogen monitoring system acceptance test report

    SciTech Connect

    Tran, T.T.

    1994-09-08

    Test Engineering was supported by Tank Waste Remediation System Safety Programs Engineering Support in the performance of an Acceptance Test Procedure (ATP) to qualify the Standard Hydrogen Monitoring System (SHMS) cabinet installed on waste tank 241-SY-103. The June 7, 1994 ATP performance was controlled by West Waste Tank Farms work package 2W-94-322. The ATP was conducted following the final installation of a second Whittaker electro-chemical hydrogen monitoring cell. The cabinet had been sited on the waste tank two years earlier, but never connected to the exhaust vent header to monitor Tank 241-SY-103 vent header exhaust gases. The cabinet was then modified, to remove two undesirable solid state hydrogen monitors and install a second Whittaker electro-chemical hydrogen monitoring sensor and signal conditioning. The ATP was used to assure that the cabinet wiring and components were properly installed and labeled and that the two years without operation had not seriously damaged the installed equipment. Electrical and pneumatic tests were performed to assure system integrity.

  14. Efficacy, safety, and patient acceptability of the Essure™ procedure

    PubMed Central

    Lessard, Collette R; Hopkins, Matthew R

    2011-01-01

    The Essure™ system for permanent contraception was developed as a less invasive method of female sterilization. Placement of the Essure™ coil involves a hysteroscopic transcervical technique. This procedure can be done in a variety of settings and with a range of anesthetic options. More than eight years have passed since the US Food and Drug Administration approval of Essure™. Much research has been done to evaluate placement success, adverse outcomes, satisfaction, pain, and the contraceptive efficacy of the Essure™. The purpose of this review is to summarize the available literature regarding the efficacy, safety, and patient satisfaction with this new sterilization technique. PMID:21573052

  15. 40 CFR 53.43 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 6 2013-07-01 2013-07-01 false Test procedures. 53.43 Section 53.43... PM 10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio...) Test procedure. (i) Establish a wind speed specified in table D-2 and measure the wind speed...

  16. 40 CFR 53.43 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 6 2014-07-01 2014-07-01 false Test procedures. 53.43 Section 53.43... PM 10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio...) Test procedure. (i) Establish a wind speed specified in table D-2 and measure the wind speed...

  17. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Test procedures. 90.707 Section 90.707... Program § 90.707 Test procedures. (a)(1) For small SI engines subject to the provisions of this subpart, the prescribed test procedures are specified in subpart E of this part. (2) The Administrator may,...

  18. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedures. 90.707 Section 90.707... Program § 90.707 Test procedures. (a)(1) For small SI engines subject to the provisions of this subpart, the prescribed test procedures are specified in subpart E of this part. (2) The Administrator may,...

  19. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Test procedures. 90.707 Section 90.707... Program § 90.707 Test procedures. (a)(1) For small SI engines subject to the provisions of this subpart, the prescribed test procedures are specified in subpart E of this part. (2) The Administrator may,...

  20. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedures. 90.707 Section 90.707... Program § 90.707 Test procedures. (a)(1) For small SI engines subject to the provisions of this subpart, the prescribed test procedures are specified in subpart E of this part. (2) The Administrator may,...

  1. 40 CFR 90.707 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 90.707 Section 90.707... Program § 90.707 Test procedures. (a)(1) For small SI engines subject to the provisions of this subpart, the prescribed test procedures are specified in subpart E of this part. (2) The Administrator may,...

  2. 16 CFR 1610.6 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... accordance with 5 U.S.C. 552(a) and 1 CFR part 51. You may obtain a copy from the American Association of... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1610.6 Section 1610.6... FLAMMABILITY OF CLOTHING TEXTILES The Standard § 1610.6 Test procedure. The test procedure is divided into...

  3. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Test procedures. 581.7 Section 581.7... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) BUMPER STANDARD § 581.7 Test procedures. (a) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times...

  4. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Test procedures. 581.7 Section 581.7... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) BUMPER STANDARD § 581.7 Test procedures. (a) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times...

  5. 40 CFR 205.54 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Test procedures. 205.54 Section 205.54... EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of vehicles...

  6. 49 CFR 581.7 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Test procedures. 581.7 Section 581.7... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) BUMPER STANDARD § 581.7 Test procedures. (a) Longitudinal impact test procedures. (1) Impact the vehicle's front surface and its rear surface two times...

  7. Product acceptance environmental and destructive testing for reliability.

    SciTech Connect

    Dvorack, Michael A.; Kerschen, Thomas J.; Collins, Elmer W.

    2007-08-01

    To determine whether a component is meeting its reliability requirement during production, acceptance sampling is employed in which selected units coming off the production line are subjected to additional environmental and/or destructive tests that are within the normal environment space to which the component is expected to be exposed throughout its life in the Stockpile. This report describes what these tests are and how they are scored for reliability purposes. The roles of screens, Engineering Use Only tests, and next assembly product acceptance testing are also discussed, along with both the advantages and disadvantages of environmental and destructive testing.

  8. Example Procedures for Developing Acceptance-Range Criteria for BESTEST-EX

    SciTech Connect

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    This document provides an example procedure for establishing acceptance-range criteria to assess results from software undergoing BESTEST-EX. This example method for BESTEST-EX is a modified version of the method described in HERS BESTEST.

  9. 46 CFR 164.019-9 - Procedure for acceptance of revisions of design, process, or materials.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) The manufacturer shall not change the design, material, manufacturing process, or construction of a... requests for acceptance of revisions in design, material, manufacturing process, or construction of a non... 46 Shipping 6 2010-10-01 2010-10-01 false Procedure for acceptance of revisions of design,...

  10. 46 CFR 164.019-9 - Procedure for acceptance of revisions of design, process, or materials.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) The manufacturer shall not change the design, material, manufacturing process, or construction of a... requests for acceptance of revisions in design, material, manufacturing process, or construction of a non... 46 Shipping 6 2012-10-01 2012-10-01 false Procedure for acceptance of revisions of design,...

  11. 46 CFR 164.019-9 - Procedure for acceptance of revisions of design, process, or materials.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) The manufacturer shall not change the design, material, manufacturing process, or construction of a... requests for acceptance of revisions in design, material, manufacturing process, or construction of a non... 46 Shipping 6 2013-10-01 2013-10-01 false Procedure for acceptance of revisions of design,...

  12. 46 CFR 164.019-9 - Procedure for acceptance of revisions of design, process, or materials.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) The manufacturer shall not change the design, material, manufacturing process, or construction of a... requests for acceptance of revisions in design, material, manufacturing process, or construction of a non... 46 Shipping 6 2011-10-01 2011-10-01 false Procedure for acceptance of revisions of design,...

  13. 46 CFR 164.019-9 - Procedure for acceptance of revisions of design, process, or materials.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) The manufacturer shall not change the design, material, manufacturing process, or construction of a... requests for acceptance of revisions in design, material, manufacturing process, or construction of a non... 46 Shipping 6 2014-10-01 2014-10-01 false Procedure for acceptance of revisions of design,...

  14. 40 CFR 60.754 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Waste Landfills § 60.754 Test methods and procedures. (a)(1) The landfill owner or operator shall... of the life of the landfill and the actual year-to-year solid waste acceptance rate is unknown, as specified in paragraph (a)(1)(ii), for part of the life of the landfill. The values to be used in...

  15. 40 CFR 205.54 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 205.54 Section 205.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures...

  16. 40 CFR 92.506 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... (3) If test procedures other than those in subpart B were used in certification of the engine family... remanufacturer shall use the test procedures used in certification for production line testing. (b)(1) The... has determined to be subject to adjustment for certification and production line testing, to...

  17. 40 CFR 92.506 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... (3) If test procedures other than those in subpart B were used in certification of the engine family... remanufacturer shall use the test procedures used in certification for production line testing. (b)(1) The... has determined to be subject to adjustment for certification and production line testing, to...

  18. 49 CFR 383.131 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Information on the requirements described in § 383.71, the implied consent to alcohol testing described in... refusal to comply with such alcohol testing, State procedures described in § 383.73, and other appropriate...; (4) Details of testing procedures, including the purpose of the tests, how to respond, any...

  19. 16 CFR 1510.4 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1510.4 Section 1510.4... REQUIREMENTS FOR RATTLES § 1510.4 Test procedure. Place the test fixture shown in Figure 1 on a horizontal plane surface. Under its own weight and in a non-compressed state apply any portion of the test...

  20. 40 CFR 204.54 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Test procedures. 204.54 Section 204.54... STANDARDS FOR CONSTRUCTION EQUIPMENT Portable Air Compressors § 204.54 Test procedures. (a) General. This... which the test is conducted. (b) Test site description. The location for measuring noise employed...

  1. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Schedule and Urban Dynamometer Driving Schedule test cycles at 40 CFR parts 86 and 600. (b) The “Special Test Procedures” provisions of 40 CFR 86.090-27 may be used to accommodate any special test procedures... 10 Energy 3 2011-01-01 2011-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT...

  2. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Test procedure. 33.37 Section 33.37 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.37 Test procedure. (a) Roof...

  3. Adolescent test or procedure preparation

    MedlinePlus

    ... else) during the procedure Playing hand-held video games Using guided imagery Trying other distractions, such as ... Alexander M. Managing patient stress in pediatric radiology. Radiol Technol . ... . Bray L, Callery P, Kirk S. A qualitative study ...

  4. Preschooler test or procedure preparation

    MedlinePlus

    ... procedure or other situation to ensure your child's safety. Restraints may be used to keep your child safe when staff temporarily have to leave the room during x-ray and nuclear studies. They may also be used when a ...

  5. Electromagnetic induction moisture measurement system acceptance test plan

    SciTech Connect

    Vargo, G.F., Westinghouse Hanford

    1996-08-01

    The purpose of this acceptance test plan (ATP) is to verify that the mechanical, electrical and software features of the ElectroMagnetic Induction (EMI) probe are operating as designed,and that the unit is ready for field service. The accepted EMI and Surface Moisture Measurement Systems (SMMS) will be used primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement of organic and ferrocyanide watch list tanks.

  6. 32 CFR 1904.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... INTELLIGENCE AGENCY PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1904.3 Procedures governing... addressed as follows: Litigation Division, Office of General Counsel, Central Intelligence Agency... Director and Deputy Director of Central Intelligence—in his or her individual capacity. (3) Mail...

  7. 32 CFR 1904.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... INTELLIGENCE AGENCY PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1904.3 Procedures governing... addressed as follows: Litigation Division, Office of General Counsel, Central Intelligence Agency... Director and Deputy Director of Central Intelligence—in his or her individual capacity. (3) Mail...

  8. 32 CFR 1904.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INTELLIGENCE AGENCY PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1904.3 Procedures governing... addressed as follows: Litigation Division, Office of General Counsel, Central Intelligence Agency... Director and Deputy Director of Central Intelligence—in his or her individual capacity. (3) Mail...

  9. 32 CFR 1904.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INTELLIGENCE AGENCY PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1904.3 Procedures governing... addressed as follows: Litigation Division, Office of General Counsel, Central Intelligence Agency... Director and Deputy Director of Central Intelligence—in his or her individual capacity. (3) Mail...

  10. 32 CFR 1904.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... INTELLIGENCE AGENCY PROCEDURES GOVERNING ACCEPTANCE OF SERVICE OF PROCESS § 1904.3 Procedures governing... addressed as follows: Litigation Division, Office of General Counsel, Central Intelligence Agency... Director and Deputy Director of Central Intelligence—in his or her individual capacity. (3) Mail...

  11. Peer-Mediated Procedures to Induce Swallowing and Food Acceptance in Young Children.

    ERIC Educational Resources Information Center

    Greer, R. Douglas; And Others

    1991-01-01

    A peer modeling procedure was shown to induce swallowing in a young child with dysphagia, and to increase food acceptance in a young child who consistently declined food. A peer-mediated procedure, consisting of rotated opportunities to consume food with a peer, increased consumption more than did modeling alone. (Author/JDD)

  12. 10 CFR 32.110 - Acceptance sampling procedures under certain specific licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Acceptance sampling procedures under certain specific licenses. 32.110 Section 32.110 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES TO MANUFACTURE OR TRANSFER CERTAIN ITEMS CONTAINING BYPRODUCT MATERIAL Quality Control Sampling Procedures §...

  13. ISOLOK VALVE ACCEPTANCE TESTING FOR DWPF SME SAMPLING PROCESS

    SciTech Connect

    Edwards, T.; Hera, K.; Coleman, C.; Jones, M.; Wiedenman, B.

    2011-12-05

    were compared to determine if the contents of the tank were well mixed. The Coliwasa sampler is a tube with a stopper at the bottom and is designed to obtain grab samples from specific locations within the drum contents. A position paper (4) was issued to address the prototypic flow loop issues and simulant selections. A statistically designed plan (5) was issued to address the total number of samples each sampler needed to pull, to provide the random order in which samples were pulled and to group samples for elemental analysis. The TTR required that the Isolok sampler perform as well as the Hydragard sampler during these tests to ensure the acceptability of the Isolok sampler for use in the DWPF sampling cells. Procedure No.L9.4-5015 was used to document the sample parameters and process steps. Completed procedures are located in R&D Engineering job folder 23269.

  14. Acceptance test plan for the 241-AN-105 multi-function corrosion monitoring system

    SciTech Connect

    EDGEMON, G.L.

    1999-06-24

    This Acceptance Test Procedure (ATP) will document the satisfactory operation of the corrosion probe tree assembly destined for installation into tank 241-AN-105. This ATP will be performed by the manufacturer prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion probe tree assembly to be installed into tank 241-AN-105. The test will consist of a pressure test to verify leak tightness of the probe tree body, a continuity test of the probe tree wiring, a test of the high level detector wiring, a test of the operation of the Type K thermocouples along the probe body, and verification of operation of corrosion monitoring computer and instrumentation.

  15. 16 CFR 1512.18 - Tests and test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Tests and test procedures. 1512.18 Section... REGULATIONS REQUIREMENTS FOR BICYCLES Regulations § 1512.18 Tests and test procedures. (a) Sharp edge test. (b) (c) Protective cap and end-mounted devices test. (Ref. § 1512.4(i), § 1512.6(d).) Any device...

  16. Test report - caustic addition system operability test procedure

    SciTech Connect

    Parazin, R.E.

    1995-10-13

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ``Caustic Addition System Operability Test Procedure``. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  17. Acceptance test report for portable exhauster POR-007/Skid E

    SciTech Connect

    Kriskovich, J.R.

    1998-07-24

    This document describes Acceptance Testing performed on Portable Exhauster POR-007/Skid E. It includes measurements of bearing vibration levels, pressure decay testing, programmable logic controller interlocks, high vacuum, flow and pressure control functional testing. The purpose of Acceptance testing documented by this report was to demonstrate compliance of the exhausters with the performance criteria established within HNF-0490, Rev. 1 following a repair and upgrade effort at Hanford. In addition, data obtained during this testing is required for the resolution of outstanding Non-conformance Reports (NCR), and finally, to demonstrate the functionality of the associated software for the pressure control and high vacuum exhauster operating modes provided for by W-320. Additional testing not required by the ATP was also performed to assist in the disposition and close out of receiving inspection report and for application design information (system curve). Results of this testing are also captured within this document.

  18. Standard-B auto grab sampler hydrogen monitoring system, Acceptance Test Report

    SciTech Connect

    Lott, D.T.

    1995-05-18

    Project W-369, Watch List Tank Hydrogen Monitors, installed a Standard-C Hydrogen Monitoring System (SHMS) on the Flammable gas waste tank AN-104. General Support Projects (8K510) was support by Test Engineering (7CH30) in the performance of the Acceptance Test Procedures (ATP) to qualify the SHMS cabinets on the waste tank. The ATP`s performance was controlled by Tank Farm work package. This completed ATP is transmitted by EDT-601748 as an Acceptance Test Report (ATR) in accordance with WHC-6-1, EP 4.2 and EP 1.12.

  19. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be...

  20. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 94.506 Section 94.506... Test procedures. (a)(1) For engines subject to the provisions of this subpart, the prescribed test...) The Administrator may, on the basis of a written application by a manufacturer, prescribe...

  1. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be...

  2. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be...

  3. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedures. 91.507 Section 91.507... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed...

  4. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Test procedures. 91.507 Section 91.507... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed...

  5. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (3) If test procedures other than those in Subpart B of this part were used in certification of the... test procedures used in certification for production line testing. (b)(1) The manufacturer may not... within the range specified in the approved application for certification. (3) The Administrator...

  6. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... (3) If test procedures other than those in Subpart B of this part were used in certification of the... test procedures used in certification for production line testing. (b)(1) The manufacturer may not... within the range specified in the approved application for certification. (3) The Administrator...

  7. 40 CFR 94.506 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... (3) If test procedures other than those in Subpart B of this part were used in certification of the... test procedures used in certification for production line testing. (b)(1) The manufacturer may not... within the range specified in the approved application for certification. (3) The Administrator...

  8. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Test procedure. 33.37 Section 33.37 Mineral... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.37 Test procedure. (a) Roof drilling: Drilling shall be done in friable strata, similar to...

  9. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedures. 91.507 Section 91.507... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed...

  10. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures. 91.507 Section 91.507... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed...

  11. 40 CFR 91.507 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Test procedures. 91.507 Section 91.507... EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Manufacturer Production Line Testing Program § 91.507 Test procedures. (a)(1) For marine SI engines subject to the provisions of this subpart, the prescribed...

  12. 16 CFR 1201.4 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedures. 1201.4 Section 1201.4... STANDARD FOR ARCHITECTURAL GLAZING MATERIALS The Standard § 1201.4 Test procedures. (a) Types of tests—(1) Impact test. Specimens shall be struck as prescribed by paragraph (d)(1) of this section using...

  13. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Test procedure. 33.37 Section 33.37 Mineral... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.37 Test procedure. (a) Roof drilling: Drilling shall be done in friable strata, similar to...

  14. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be...

  15. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Test procedure. 33.37 Section 33.37 Mineral... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.37 Test procedure. (a) Roof drilling: Drilling shall be done in friable strata, similar to...

  16. 40 CFR 203.3 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 203.3 Section 203.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS LOW-NOISE-EMISSION PRODUCTS § 203.3 Test procedures. (a) The applicant shall test or cause his product to be...

  17. Acceptance Test Plan for the Sludge Pickup Adaptor

    SciTech Connect

    PITNER, A.L.

    2000-03-29

    This test plan documents the acceptance testing of the sludge pickup adapter for potential use during PSI Phases 3 and 4 fuel cleanliness inspection activities. The adaptex is attached to the strainer tip of the vacuum wand and used to suction up residual sludge captured in a sludge collection tray. The material is vacuumed into a chamber of known volume in the sludge pickup adapter. The device serves as an aid in helping to determine whether the observed quantity of sludge is within allowable limits (1.4 cm{sup 3} per fuel assembly). This functionality test involves underwater testing in the 305 Building Cold Test Facility to verify that sludge can be successfully vacuumed from a collection tray. Ancillary activities in this acceptance test include demonstration that the sludge pickup adapter CM be successfully attached to and detached from the vacuum wand underwater.

  18. DUAL ALKALI ACCEPTANCE TEST AT LOUISVILLE GAS AND ELECTRIC COMPANY; VOLUME I. ACCEPTANCE TEST AND APPENDICES A-C

    EPA Science Inventory

    The report gives results of the completed acceptance test series run on the dual alkali system serving Louisville Gas and Electric Company's Cane Run Unit 6 boiler. This volume contains the process description and a discussion of the test results, operating history, and performan...

  19. 16 CFR 1512.18 - Tests and test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Tests and test procedures. 1512.18 Section 1512.18 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FEDERAL HAZARDOUS SUBSTANCES ACT REGULATIONS REQUIREMENTS FOR BICYCLES Regulations § 1512.18 Tests and test procedures. (a) Sharp edge test. (b) (c) Protective cap and end-mounted...

  20. 40 CFR 53.66 - Test procedure: Volatility test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling...

  1. 40 CFR 53.66 - Test procedure: Volatility test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 6 2014-07-01 2014-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM 2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling...

  2. 40 CFR 53.66 - Test procedure: Volatility test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling...

  3. 40 CFR 53.66 - Test procedure: Volatility test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 6 2012-07-01 2012-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling...

  4. Verification and acceptance tests of the PRIMA DDL optics

    NASA Astrophysics Data System (ADS)

    Bizenberger, Peter; Baumeister, Harald; Graser, Uwe; Henning, Thomas; Krause, Nathalie; Launhardt, Ralf; Naranjo, Vianak; Queloz, Didier; Quirrenbach, Andreas

    2008-07-01

    The last step in designing and building instruments are the verification and acceptance tests of the assembled units and of the final instrument. For instruments, which are engineered to work at the limit of feasibility, these tests must be accurate and stable at a level much better than the expected performance of the instrument. Particularly for interferometric instruments, this requires special care for the test planning and implementation in order to achieve the necessary performance. This paper describes the verification and acceptance tests of the PRIMA DDL optics in terms of wavefront error and tilt requirements as well as the assembling and aligning accuracy. We demonstrate the conformity of the optics and point out the limitations of the test methods.

  5. Lotka's Law: A Testing Procedure.

    ERIC Educational Resources Information Center

    Pao, Miranda Lee

    1985-01-01

    A step-by-step outline is presented for testing the applicability of Lotka's law of scientific productivity. Steps include the computation of the values of the exponent and constant based on Lotka's method and the test for significance of observed frequency distribution against the estimated theoretical distribution derived from Lotka's formula.…

  6. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Methods for SO2, CO, O3, and NO2 § 53.23 Test procedures. (a) Range—(1) Technical definition. The nominal... air with the test analyzer for 60 minutes. During this 60-minute interval, record twenty-five...

  7. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Methods for SO2, CO, O3, and NO2 § 53.23 Test procedures. (a) Range—(1) Technical definition. The nominal... air with the test analyzer for 60 minutes. During this 60-minute interval, record twenty-five...

  8. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Methods for SO2, CO, O3, and NO2 § 53.23 Test procedures. (a) Range—(1) Technical definition. The nominal... air with the test analyzer for 60 minutes. During this 60-minute interval, record twenty-five...

  9. SEP BIMOD variable conductance heat pipes acceptance and characterization tests

    NASA Technical Reports Server (NTRS)

    Hemminger, J. A.

    1981-01-01

    A series of six heat pipes, similar in design to those flown on the Comunications Technology Satellite Hermes, for use in a prototype Solar Electric Propulsion BIMOD thrust module are evaluated. The results of acceptance and characterization tests performed on the heat pipe subassemble are reported. The performance of all the heat pipes met, or exceeded, design specifications.

  10. SEP BIMOD variable conductance heat pipes acceptance and characterization tests

    NASA Astrophysics Data System (ADS)

    Hemminger, J. A.

    1981-08-01

    A series of six heat pipes, similar in design to those flown on the Comunications Technology Satellite Hermes, for use in a prototype Solar Electric Propulsion BIMOD thrust module are evaluated. The results of acceptance and characterization tests performed on the heat pipe subassemble are reported. The performance of all the heat pipes met, or exceeded, design specifications.

  11. Electromagnetic induction moisture measurement system acceptance test report

    SciTech Connect

    Vargo, G.J.

    1996-10-07

    This document presents the results of the acceptance test for the hardware and software that was developed to operate the ElectroMagnetic Induction (EMI) moisture measurement system to be used for in-tank moisture measurements. This document satisfies EP 4.1, ``Design Verification Requirements``.

  12. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  13. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  14. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  15. 46 CFR 164.013-5 - Acceptance tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Acceptance tests. 164.013-5 Section 164.013-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Foam, Unicellular Polyethylene (Buoyant, Slab, Slitted Trigonal...

  16. Acceptance test report MICON software exhaust fan control modifications

    SciTech Connect

    SILVAN, G.R.

    1999-05-20

    This report documents the results the acceptance test HNF-4108 which verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, the alarms for the new emergency fan damper backup air compressor, and the generator sequencer logic.

  17. Standard-D hydrogen monitoring system acceptance test

    SciTech Connect

    Lott, D.T., Westinghouse Hanford

    1996-05-24

    This document details the results of the field Acceptance Testing of the Standard-D Hydrogen Monitoring System on the waste tank exhaust stacks in 241-AW and 241-AN tank farm. The monitors will be used to measure hydrogen and ammonia from the exhaust stacks.

  18. 49 CFR 399.209 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Test procedures. 399.209 Section 399.209 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY... STANDARDS Step, Handhold, and Deck Requirements for Commercial Motor Vehicles § 399.209 Test procedures....

  19. 40 CFR 53.43 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedures. 53.43 Section 53.43... PM10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio (expressed... or filters to the mass concentration of particles of the same size approaching the sampler. (2)...

  20. 40 CFR 53.43 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedures. 53.43 Section 53.43... PM10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio (expressed... or filters to the mass concentration of particles of the same size approaching the sampler. (2)...

  1. 49 CFR 399.209 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Test procedures. 399.209 Section 399.209 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY... STANDARDS Step, Handhold, and Deck Requirements for Commercial Motor Vehicles § 399.209 Test procedures....

  2. 40 CFR 89.508 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... limited to, the effect of the adjustment on engine performance characteristics and surveillance... service at a minimum rate of 16 hours per engine during each 24-hour period, unless otherwise approved by... test procedures are the nonroad engine 8-mode test procedure as described in subpart E of this...

  3. Automatically generated acceptance test: A software reliability experiment

    NASA Technical Reports Server (NTRS)

    Protzel, Peter W.

    1988-01-01

    This study presents results of a software reliability experiment investigating the feasibility of a new error detection method. The method can be used as an acceptance test and is solely based on empirical data about the behavior of internal states of a program. The experimental design uses the existing environment of a multi-version experiment previously conducted at the NASA Langley Research Center, in which the launch interceptor problem is used as a model. This allows the controlled experimental investigation of versions with well-known single and multiple faults, and the availability of an oracle permits the determination of the error detection performance of the test. Fault interaction phenomena are observed that have an amplifying effect on the number of error occurrences. Preliminary results indicate that all faults examined so far are detected by the acceptance test. This shows promise for further investigations, and for the employment of this test method on other applications.

  4. W-026 acceptance test report system integration equipment (SIE)(submittal {number_sign} 018.6.A)

    SciTech Connect

    Watson, T.L.

    1997-01-27

    Acceptance testing of the System Integration Equipment (SIE) at Hanford was performed in two stages. The first was inconclusive, and resulted in a number of findings. These finding. are summarized as part of this report. The second stage of testing addressed these findings, and performed full system testing per the approved test procedure. This report includes summaries of all testing, results and finding.. Although the SIE did not in some cases perform as required for plant operations, it did perform per the system specification. (These discrepancies were noted and are addressed elsewhere.) Following testing, the system was formaLLy accepted. Documentation of this acceptance is incLuded in this report.

  5. Redstone Test Stand Accepted Into National Register of Historical Places

    NASA Technical Reports Server (NTRS)

    1976-01-01

    On October 02, 1976, Marshall Space Flight Center's (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand are Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, as he is accepting a certificate of registration from Madison County Commission Chairman James Record, and Huntsville architect Harvie Jones.

  6. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA, JUNE 2006

    SciTech Connect

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE

    2006-06-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  7. W-026, acceptance test report TRU empty drum compactor (submittal{number_sign}634)

    SciTech Connect

    Watson, T.L.

    1997-06-18

    On 10/19/96 and 10/21/96, the 06/04/96 version of the Empty Drum Compactor Acceptance Test Procedure was used to perform tests by INET Corporation at the Hanford WRAP facility. The INET compaction components were installed in the Diversified glovebox. The Diversified glovebox and cart and the INET compaction components, EDC HPU and drum centering device constitute the Empty Drum Compactor.

  8. Startup of the FFTF sodium cooled reactor. [Acceptance Test Program

    SciTech Connect

    Redekopp, R.D.; Umek, A.M.

    1981-03-01

    The Fast Flux Test Facility (FFTF), located on the Department of Energy (DOE) Hanford Reservation near Richland, Washington, is a 3 Loop 400 MW(t) sodium cooled fast reactor with a primary mission to test fuels and materials for development of the Liquid Metal Fast Breeder Reactor (LMFBR). Bringing FFTF to a condition to accomplish this mission is the goal of the Acceptance Test Program (ATP). This program was the mechanism for achieving startup of the FFTF. Highlights of the ATP involving the system inerting, liquid metal and inerted cell testing and initial ascent to full power are discussed.

  9. 16 CFR 1615.4 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 U.S.C. 552(a) and 1 CFR part 51. Items which do not withstand 50 launderings shall be tested at... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1615.4 Section 1615.4... FLAMMABILITY OF CHILDREN'S SLEEPWEAR: SIZES 0 THROUGH 6X (FF 3-71) The Standard § 1615.4 Test procedure....

  10. Retrofit and acceptance test of 30-cm ion thrusters

    NASA Technical Reports Server (NTRS)

    Poeschel, R. L.

    1981-01-01

    Six 30 cm mercury thrusters were modified to the J-series design and evaluated using standardized test procedures. The thruster performance meets the design objectives (lifetime objective requires verification), and documentation (drawings, etc.) for the design is completed and upgraded. The retrofit modifications are described and the test data for the modifications are presented and discussed.

  11. 32 CFR 1702.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... THE DIRECTOR OF NATIONAL INTELLIGENCE PROCEDURES GOVERNING THE ACCEPTANCE OF SERVICE OF PROCESS § 1702... Intelligence, Office of General Counsel, Washington, DC 20511, and the envelope must be conspicuously marked... capacity. Except for the DNI, the Principal Deputy Director of National Intelligence, and the Director...

  12. 32 CFR 1702.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... THE DIRECTOR OF NATIONAL INTELLIGENCE PROCEDURES GOVERNING THE ACCEPTANCE OF SERVICE OF PROCESS § 1702... Intelligence, Office of General Counsel, Washington, DC 20511, and the envelope must be conspicuously marked... capacity. Except for the DNI, the Principal Deputy Director of National Intelligence, and the Director...

  13. 32 CFR 1702.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... THE DIRECTOR OF NATIONAL INTELLIGENCE PROCEDURES GOVERNING THE ACCEPTANCE OF SERVICE OF PROCESS § 1702... Intelligence, Office of General Counsel, Washington, DC 20511, and the envelope must be conspicuously marked... capacity. Except for the DNI, the Principal Deputy Director of National Intelligence, and the Director...

  14. 32 CFR 1702.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... THE DIRECTOR OF NATIONAL INTELLIGENCE PROCEDURES GOVERNING THE ACCEPTANCE OF SERVICE OF PROCESS § 1702... Intelligence, Office of General Counsel, Washington, DC 20511, and the envelope must be conspicuously marked... capacity. Except for the DNI, the Principal Deputy Director of National Intelligence, and the Director...

  15. 32 CFR 1702.3 - Procedures governing acceptance of service of process.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... THE DIRECTOR OF NATIONAL INTELLIGENCE PROCEDURES GOVERNING THE ACCEPTANCE OF SERVICE OF PROCESS § 1702... Intelligence, Office of General Counsel, Washington, DC 20511, and the envelope must be conspicuously marked... capacity. Except for the DNI, the Principal Deputy Director of National Intelligence, and the Director...

  16. 46 CFR 160.062-7 - Procedures for acceptance of repair facility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., Hydraulic and Manual § 160.062-7 Procedures for acceptance of repair facility. (a) Before a repair facility... a hydraulic release, evidenced by a signed agreement between the facility and his source of supply... paragraph. Each employee who is engaged in serving a hydraulic release must demonstrate his competence...

  17. Acceptability of Functional Behavioral Assessment Procedures to Special Educators and School Psychologists

    ERIC Educational Resources Information Center

    O'Neill, Robert E.; Bundock, Kaitlin; Kladis, Kristin; Hawken, Leanne S.

    2015-01-01

    This survey study assessed the acceptability of a variety of functional behavioral assessment (FBA) procedures (i.e., functional assessment interviews, rating scales/questionnaires, systematic direct observations, functional analysis manipulations) to a national sample of 123 special educators and a state sample of 140 school psychologists.…

  18. 46 CFR 164.019-5 - Standard components; acceptance criteria and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Standard components; acceptance criteria and procedures. 164.019-5 Section 164.019-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Personal Flotation...

  19. Final Acceptance Tests of Helium Refrigerator for Wendelstein 7-X

    NASA Astrophysics Data System (ADS)

    Dhard, C. P.; Nagel, M.; Raatz, S.; Nuesslein, U.; Ressel, M.

    Following successful installation and commissioning, final acceptance tests were carried out on the helium refrigerator for Wendelstein 7-X.The tests were carried out for the normal operating modes i.e. peak power mode (3.4 K), standard mode(3.9 K), short standby mode (< 10 K) and long standby mode (< 100 K).Besides the normal modes, the transient modes including, cool-down and warm-up, auto interchanging between various modes and the purging modes were tested.In addition, the handling of quench, emergency signals such as cryostat vacuum break,utility failure, alarm and trip signals were checked.

  20. Surface moisture measurement system hardware acceptance test report

    SciTech Connect

    Ritter, G.A., Westinghouse Hanford

    1996-05-28

    This document summarizes the results of the hardware acceptance test for the Surface Moisture Measurement System (SMMS). This test verified that the mechanical and electrical features of the SMMS functioned as designed and that the unit is ready for field service. The bulk of hardware testing was performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. The SMMS was developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks.

  1. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 6 2014-07-01 2014-07-01 false Test procedure: Static fractionator test. 53.64 Section 53.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR MONITORING REFERENCE AND EQUIVALENT METHODS Procedures for Testing Performance Characteristics of Class II...

  2. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 6 2013-07-01 2013-07-01 false Test procedure: Static fractionator test. 53.64 Section 53.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR MONITORING REFERENCE AND EQUIVALENT METHODS Procedures for Testing Performance Characteristics of Class II...

  3. DOT-7A packaging test procedure

    SciTech Connect

    Kelly, D.L.

    1995-01-23

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  4. MCO combustible gas management leak test acceptance criteria

    SciTech Connect

    SHERRELL, D.L.

    1999-05-11

    Existing leak test acceptance criteria for mechanically sealed and weld sealed multi-canister overpacks (MCO) were evaluated to ensure that MCOs can be handled and stored in stagnant air without compromising the Spent Nuclear Fuel Project's overall strategy to prevent accumulation of combustible gas mixtures within MCO's or within their surroundings. The document concludes that the integrated leak test acceptance criteria for mechanically sealed and weld sealed MCOs (1 x 10{sup -5} std cc/sec and 1 x 10{sup -7} std cc/sec, respectively) are adequate to meet all current and foreseeable needs of the project, including capability to demonstrate compliance with the NFPA 60 Paragraph 3-3 requirement to maintain hydrogen concentrations [within the air atmosphere CSB tubes] t or below 1 vol% (i.e., at or below 25% of the LFL).

  5. SAPHIRE Change Design and Testing Procedure

    SciTech Connect

    Curtis Smith

    2010-02-01

    This document describes the procedure software developers of SAPHIRE follow when adding a new feature or revising an existing capability. This procedure first describes the general approach to changes, and then describes more specific processes. The process stages include design and development, testing, and documentation.

  6. 30 CFR 33.37 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Test procedure. 33.37 Section 33.37 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test...

  7. 40 CFR 1033.315 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... test procedures other than those in subpart F of this part during certification for the engine family... used in certification. (b) Modifying a test locomotive. Once an engine is selected for testing, you may... establish a Green Engine Factor for each regulated pollutant for each engine family, instead of (or...

  8. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Schedule and Urban Dynamometer Driving Schedule test cycles at 40 CFR parts 86 and 600. (b) The “Special Test Procedures” provisions of 40 CFR 86.090-27 may be used to accommodate any special test procedures... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION...

  9. Development of Performance Acceptance Test Guidelines for Large Commercial Parabolic Trough Solar Fields: Preprint

    SciTech Connect

    Kearney, D.; Mehos, M.

    2010-12-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the EPC contractor or owners. In lieu of the present absence of engineering code developed for this purpose, NREL has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The fundamental differences between acceptance of a solar power plant and a conventional fossil-fired plant are the transient nature of the energy source and the necessity to utilize an analytical performance model in the acceptance process. These factors bring into play the need to establish methods to measure steady state performance, potential impacts of transient processes, comparison to performance model results, and the possible requirement to test, or model, multi-day performance within the scope of the acceptance test procedure. The power block and BOP are not within the boundaries of this guideline. The current guideline is restricted to the solar thermal performance of parabolic trough systems and has been critiqued by a broad range of stakeholders in CSP development and technology.

  10. 16 CFR 1616.5 - Test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test procedure. 1616.5 Section 1616.5... FLAMMABILITY OF CHILDREN'S SLEEPWEAR: SIZES 7 THROUGH 14 (FF 5-74) The Standard § 1616.5 Test procedure....

  11. Acceptance test report for portable exhauster POR-008/Skid F

    SciTech Connect

    Kriskovich, J.R.

    1998-07-24

    Portable Exhauster POR-008 was procured via HNF-0490, Specification for a Portable Exhausted System for Waste Tank Ventilation. Prior to taking ownership, acceptance testing was performed at the vendors. However at the conclusion of testing a number of issues remained that required resolution before the exhausters could be used by Project W-320. The purpose of acceptance testing documented by this report was to demonstrate compliance of the exhausters with the performance criteria established within HNF-O49O, Rev. 1 following a repair and upgrade effort at Hanford. In addition, data obtained during this testing is required for the resolution of outstanding Non-conformance Reports (NCR), and finally, to demonstrate the functionality of the associated software for the pressure control and high vacuum exhauster operating modes provided for by W-320. Additional testing not required by the ATP was also performed to assist in the disposition and close out of receiving inspection report and for application design information (system curve). Results of this testing are also captured within this document.

  12. When is diagnostic testing inappropriate or irrational? Acceptable regret approach.

    PubMed

    Hozo, Iztok; Djulbegovic, Benjamin

    2008-01-01

    The authors provide a new model within the framework of theories of bounded rationality for the observed physicians' behavior that their ordering of diagnostic tests may not be rational. Contrary to the prevailing thinking, the authors find that physicians do not act irrationally or inappropriately when they order diagnostic tests in usual clinical practice. When acceptable regret (i.e., regret that a decision maker finds tolerable upon making a wrong decision) is taken into account, the authors show that physicians tend to order diagnostic tests at a higher level of pretest probability of disease than predicted by expected utility theory. They also show why physicians tend to overtest when regret about erroneous decisions is extremely small. Finally, they explain variations in the practice of medicine. They demonstrate that in the same clinical situation, different decision makers might have different acceptable regret thresholds for withholding treatment, for ordering a diagnostic test, or for administering treatment. This in turn means that for some decision makers, the most rational strategy is to do nothing, whereas for others, it may be to order a diagnostic test, and still for others, choosing treatment may be the most rational course of action. PMID:18480041

  13. Test procedure for boxed waste assay system

    SciTech Connect

    Wachter, J.

    1994-12-07

    This document, prepared by Los Alamos National Laboratory`s NMT-4 group, details the test methodology and requirements for Acceptance/Qualification testing of a Boxed Waste Assay System (BWAS) designed and constructed by Pajarito Scientific Corporation. Testing of the BWAS at the Plutonium Facility (TA55) at Los Alamos National Laboratory will be performed to ascertain system adherence to procurement specification requirements. The test program shall include demonstration of conveyor handling capabilities, gamma ray energy analysis, and imaging passive/active neutron accuracy and sensitivity. Integral to these functions is the system`s embedded operating and data reduction software.

  14. Nevada Test Site waste acceptance criteria [Revision 1

    SciTech Connect

    1997-08-01

    Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  15. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static... sampler's operating manual referred to in section 7.4.18 of 40 CFR part 50, appendix L. (2) Generate... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Test procedure: Static...

  16. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    SciTech Connect

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  17. Acceptance Test Report for Fourth-Generation Hanford Corrosion Monitoring Cabinet

    SciTech Connect

    NORMAN, E.C.

    2000-10-23

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation.

  18. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... Schedule and Urban Dynamometer Driving Schedule test cycles at 40 CFR parts 86 and 600. (b) The...

  19. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... Schedule and Urban Dynamometer Driving Schedule test cycles at 40 CFR parts 86 and 600. (b) The...

  20. 10 CFR 474.4 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy... Schedule and Urban Dynamometer Driving Schedule test cycles at 40 CFR parts 86 and 600. (b) The...

  1. Acceptability of prenatal testing and termination of pregnancy in Pakistan.

    PubMed

    Jafri, H; Hewison, J; Sheridan, E; Ahmed, S

    2015-01-01

    This study aimed to assess acceptability of prenatal testing (PNT) and termination of pregnancy (TOP) for a range of conditions in Pakistani parents with and without a child with a genetic condition. A structured questionnaire assessing acceptability of PNT and TOP for 30 conditions was completed by 400 Pakistani participants: 200 parents with a child with a genetic condition (100 fathers and 100 mothers) and 200 parents without an affected child (100 fathers and 100 mothers). There was a high level of interest in PNT, where over 80 % of parents in all four study groups would want PNT for the majority of the conditions. There was comparatively less interest in TOP for the same conditions (ranging from 5 to 70 % of parents, with mothers of an affected child being most interested). Parents were most likely to be interested in TOP for conditions at the serious end of the continuum. More than half of the participants in each group would consider TOP for anencephaly and quadriplegia. The interest in PNT and TOP for a range of conditions suggests that rapidly developing PNT technologies are likely to be acceptable in Pakistan, a low-middle income level and Muslim country. The comparatively lower level of interest in TOP for the same conditions highlights ethical dilemmas that such technologies are likely to raise. PMID:25081227

  2. [Clinical trial data validation and user acceptance testing].

    PubMed

    Sun, Hua-long; Dai, Nan

    2015-11-01

    For pharmaceutical industries, clinical data is one of the most valuable deliverables. It is also the basis of analysis, submission, approval, labeling and marketing of a drug product. To ensure the integrity and reliability of clinical data, a scientific standardized quality control (QC) has to be established at each step of a clinical trial. Data validation is conducted to ensure the reasonability and compliance of clinical data by checking data quality before the data is statistically analyzed. This paper focuses on purpose of data validation, creation of data validation plan, rationale of data validation, types of data validation and performance of user acceptance testing on clinical database. PMID:26911047

  3. Waste retrieval sluicing system data acquisition system acceptance test report

    SciTech Connect

    Bevins, R.R.

    1998-07-31

    This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115.

  4. Trust, confidence, procedural fairness, outcome fairness, moral conviction, and the acceptance of GM field experiments.

    PubMed

    Siegrist, Michael; Connor, Melanie; Keller, Carmen

    2012-08-01

    In 2005, Swiss citizens endorsed a moratorium on gene technology, resulting in the prohibition of the commercial cultivation of genetically modified crops and the growth of genetically modified animals until 2013. However, scientific research was not affected by this moratorium, and in 2008, GMO field experiments were conducted that allowed us to examine the factors that influence their acceptance by the public. In this study, trust and confidence items were analyzed using principal component analysis. The analysis revealed the following three factors: "economy/health and environment" (value similarity based trust), "trust and honesty of industry and scientists" (value similarity based trust), and "competence" (confidence). The results of a regression analysis showed that all the three factors significantly influenced the acceptance of GM field experiments. Furthermore, risk communication scholars have suggested that fairness also plays an important role in the acceptance of environmental hazards. We, therefore, included measures for outcome fairness and procedural fairness in our model. However, the impact of fairness may be moderated by moral conviction. That is, fairness may be significant for people for whom GMO is not an important issue, but not for people for whom GMO is an important issue. The regression analysis showed that, in addition to the trust and confidence factors, moral conviction, outcome fairness, and procedural fairness were significant predictors. The results suggest that the influence of procedural fairness is even stronger for persons having high moral convictions compared with persons having low moral convictions. PMID:22150405

  5. Biomonitoring test procedures and biological criteria

    SciTech Connect

    Kszos, L.A.; Lipschultz, M.J.; Foster, W.E.

    1997-10-01

    The Water Environment Federation recently issued a special publication, Biomonitoring in the Water Environment. In this paper, the authors highlight the contents of the chapter 3, Biomonitoring Test Procedures, identify current trends in test procedures and introduce the concept of biological criteria (biocriteria). The book chapter (and this paper) focuses on freshwater and marine chronic and acute toxicity tests used in the National Pollutant Discharge Elimination System (NPDES) permits program to identify effluents and receiving waters containing toxic materials in acutely or chronically toxic concentrations. The two major categories of toxicity tests include acute tests and chronic tests. The USEPA chronic tests required in NPDEs permits have been shortened to 7 days by focusing on the most sensitive life-cycle stages; these tests are often referred to as short-term chronic tests. The type of test(s) required depend on NPDES permit requirements, objectives of the test, available resources, requirements of the test organisms, and effluent characteristics such as variability in flow or toxicity. The permit writer will determine the requirements for toxicity test(s) by considering such factors as dilution, effluent variability, and exposure variability. Whether the required test is acute or chronic, the objective of the test is to estimate the safe or no effect concentration which is defined as the concentration which will permit normal propagation of fish and other aquatic life in the receiving waters. In this paper, the authors review the types of toxicity tests, the commonly used test organisms, and the uses of toxicity test data. In addition, they briefly describe research on new methods and the use of biological criteria.

  6. Standard-E hydrogen monitoring system shop acceptance test procedure

    SciTech Connect

    Schneider, T.C.

    1997-10-02

    The purpose of this report is to document that the Standard-E Hydrogen Monitoring Systems (SHMS-E), fabricated by Mid-Columbia Engineering (MCE) for installation on the Waste Tank Farms in the Hanford 200 Areas, are constructed as intended by the design. The ATP performance will verify proper system fabrication.

  7. Standard-C hydrogen monitoring system acceptance test procedure

    SciTech Connect

    Schneider, T.C.

    1994-09-02

    The primary function of the standard-C hydrogen monitoring system (SHMS) is to monitor specifically for hydrogen in the waste tank atmosphere which may also contain (but not be limited to) unknown quantities of air, nitrous oxide, ammonia, water vapor, carbon dioxide, carbon monoxide, and other gaseous constituents. The SHMS will consist of hydrogen specific monitors, a grab sampler to collect samples for laboratory analysis, a gas chromatograph, and the gas sample collection system necessary to support the operation of the instrumentation. This system will be located in a cabinet placed at the tank of interest. The purpose of this document is to demonstrate that the SHMS is constructed as intended by design.

  8. Accuracy test procedure for image evaluation techniques.

    PubMed

    Jones, R A

    1968-01-01

    A procedure has been developed to determine the accuracy of image evaluation techniques. In the procedure, a target having orthogonal test arrays is photographed with a high quality optical system. During the exposure, the target is subjected to horizontal linear image motion. The modulation transfer functions of the images in the horizontal and vertical directions are obtained using the evaluation technique. Since all other degradations are symmetrical, the quotient of the two modulation transfer functions represents the modulation transfer function of the experimentally induced linear image motion. In an accurate experiment, any discrepancy between the experimental determination and the true value is due to inaccuracy in the image evaluation technique. The procedure was used to test the Perkin-Elmer automated edge gradient analysis technique over the spatial frequency range of 0-200 c/m. This experiment demonstrated that the edge gradient technique is accurate over this region and that the testing procedure can be controlled with the desired accuracy. Similarly, the test procedure can be used to determine the accuracy of other image evaluation techniques. PMID:20062421

  9. Topographical mapping system for radiological and hazardous environments acceptance testing

    SciTech Connect

    Armstrong, G.A.; Dochat, G.R.

    1997-12-01

    During the summer of 1996, the Topographical Mapping System (TMS) for hazardous and radiological environments and its accompanying three-dimensional (3-D) visualization tool, the Interactive Computer-Enhanced Remote-Viewing System (ICERVS), were delivered to Oak Ridge National Laboratory (ORNL). ORNL and Mechanical Technology, Inc., performed final acceptance testing of the TMS during the next eight months. The TMS was calibrated and characterized during this period. This paper covers the calibration, characterization, and acceptance testing of the TMS. Development of the TMS and ICERVS was initiated by the US Department of Energy (DOE) for the purpose of characterization and remediation of underground storage tanks (USTs) at DOE sites across the country. DOE required a 3-D, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is the mapping of the interior of USTs as part of DOE`s waste characterization and remediation efforts and to obtain baseline data on the content of the storage tank interiors as well as data on changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Washington site, the TMS is designed to be a self-contained, compact, and reconfigurable system that is capable of providing rapid, variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention.

  10. Topographical mapping system for radiological and hazardous environments acceptance testing

    NASA Astrophysics Data System (ADS)

    Armstrong, Gary A.; Dochat, G. R.

    1997-09-01

    During the summer of 1996, the topographical mapping system (TMS) for hazardous and radiological environments and its accompanying three-dimensional (3-D) visualization tool, the interactive computer-enhanced remote-viewing system (ICERVS), were delivered to Oak Ridge National Laboratory (ORNL). ORNL and Mechanical Technology, Inc., performed final acceptance testing of the TMS during the next eight months. The TMS was calibrated and characterized during this period. This paper covers the calibration, characterization, and acceptance testing of the TMS. Development of the TMS and the ICERVS was initiated by the U.S. Department of Energy (DOE) for the purpose of characterization and remediation of underground storage tanks (USTs) at DOE sites across the country. DOE required a 3-D, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is the mapping of the interior of USTs as part of DOE's waste characterization and remediation efforts and to obtain baseline data on the content of the storage tank interiors as well as data on changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Washington site, the TMS is designed to be a self-contained, compact, reconfigurable system that is capable of providing rapid, variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention.

  11. Factory acceptance test results for the DIRSP projection optics

    NASA Astrophysics Data System (ADS)

    Thomas, Matthew C.; Ward, Craig S.

    2000-07-01

    The Factory Acceptance Test (FAT) results for the projection optical subsystem (POS) of US Army STIRCOM's dynamic infrared scene projector (DIRSP) are presented in this paper. DIRSP is a low background (-35 degrees Celsius) hardware-in-the- loop (HWIL), long-wave infrared (LWIR) scene projector built by Mission Research Corporation (MRC) for use by the Redstone Technical Test Center (RTTC). It has an effective emitter array size of 1632 X 672 suspended-membrane micro-resistor elements. The POS is responsible for generating this effective array size from three smaller arrays using a mosaic image combiner, adding background light from an external blackbody, and collimating the combined radiation with a 5:1 vacuum enclosed -35 degree Celsius zoom lens. The FAT results reported demonstrate good POS performance compared to the design for focal length, F/#, MTF and apparent temperature.

  12. 40 CFR 610.65 - Other test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 31 2013-07-01 2013-07-01 false Other test procedures. 610.65 Section... ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Special Test Procedures § 610.65 Other test procedures. The Administrator may, pursuant to § 610.31(c), choose a test procedure or...

  13. 40 CFR 610.65 - Other test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Other test procedures. 610.65 Section... ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Special Test Procedures § 610.65 Other test procedures. The Administrator may, pursuant to § 610.31(c), choose a test procedure or...

  14. 40 CFR 610.65 - Other test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Other test procedures. 610.65 Section... ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Special Test Procedures § 610.65 Other test procedures. The Administrator may, pursuant to § 610.31(c), choose a test procedure or...

  15. 40 CFR 610.65 - Other test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Other test procedures. 610.65 Section... ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Special Test Procedures § 610.65 Other test procedures. The Administrator may, pursuant to § 610.31(c), choose a test procedure or...

  16. 40 CFR 610.65 - Other test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Other test procedures. 610.65 Section... ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Special Test Procedures § 610.65 Other test procedures. The Administrator may, pursuant to § 610.31(c), choose a test procedure or...

  17. Type of Speech Material Affects Acceptable Noise Level Test Outcome.

    PubMed

    Koch, Xaver; Dingemanse, Gertjan; Goedegebure, André; Janse, Esther

    2016-01-01

    The acceptable noise level (ANL) test, in which individuals indicate what level of noise they are willing to put up with while following speech, has been used to guide hearing aid fitting decisions and has been found to relate to prospective hearing aid use. Unlike objective measures of speech perception ability, ANL outcome is not related to individual hearing loss or age, but rather reflects an individual's inherent acceptance of competing noise while listening to speech. As such, the measure may predict aspects of hearing aid success. Crucially, however, recent studies have questioned its repeatability (test-retest reliability). The first question for this study was whether the inconsistent results regarding the repeatability of the ANL test may be due to differences in speech material types used in previous studies. Second, it is unclear whether meaningfulness and semantic coherence of the speech modify ANL outcome. To investigate these questions, we compared ANLs obtained with three types of materials: the International Speech Test Signal (ISTS), which is non-meaningful and semantically non-coherent by definition, passages consisting of concatenated meaningful standard audiology sentences, and longer fragments taken from conversational speech. We included conversational speech as this type of speech material is most representative of everyday listening. Additionally, we investigated whether ANL outcomes, obtained with these three different speech materials, were associated with self-reported limitations due to hearing problems and listening effort in everyday life, as assessed by a questionnaire. ANL data were collected for 57 relatively good-hearing adult participants with an age range representative for hearing aid users. Results showed that meaningfulness, but not semantic coherence of the speech material affected ANL. Less noise was accepted for the non-meaningful ISTS signal than for the meaningful speech materials. ANL repeatability was comparable across

  18. (Quality control and nondestructive test procedures for welded products)

    SciTech Connect

    Childress, C.E.

    1990-11-09

    The International Institute of Welding is composed of some 600 technical experts from 36 countries. These individuals are divided by talent and personal interest into fifteen separate groups called Commissions, each with its own charter and goals. The title, and by inference the charter, of Commission V is : Quality Control and Quality Assurance of Welded Products. In pursuit of its charter Commission V has several subcommissions engaged in the development of drafts, procedures, and standards. Those documents subsequently considered suitable may be submitted to the International Organization for Standards (ISO), an organization similar to the American Society for Testing Materials, for acceptance as international standards. All ISO Procedures and standards which have been in effect for five years must undergo review by the initiating body. The results from review of five-year-old standards and procedures and the discussion of other documents proposed for international publication are presented.

  19. Axle efficiency test procedure. SAE standard

    SciTech Connect

    1995-04-01

    Data from this SAE Recommended Practice permit mapping axle efficiency and/or waste energy over the operating range of passenger cars, trucks, buses, and other highway vehicles. The procedure can be applied to single axles, tandem axles as a system, or other systems, by combining separate tests, such as tests of the front axle and power divider and rear axle of tandem or tri-drive type.

  20. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... commercial clothes washers. Energy Conservation Standards...

  1. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... commercial clothes washers. Energy Conservation Standards...

  2. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... commercial clothes washers. Energy Conservation Standards...

  3. 10 CFR 431.154 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Test procedures. 431.154 Section 431.154 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL... commercial clothes washers. Energy Conservation Standards...

  4. 40 CFR 91.607 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Test procedures. 91.607 Section 91.607 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Selective Enforcement Auditing Regulations § 91.607...

  5. 40 CFR 90.508 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Test procedures. 90.508 Section 90.508 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NONROAD SPARK-IGNITION ENGINES AT OR BELOW 19 KILOWATTS Selective Enforcement Auditing §...

  6. The Cloze Procedure as a Progress Test.

    ERIC Educational Resources Information Center

    Stansfield, Charles

    This paper reports on a pilot study conducted to determine the possible use of the cloze procedure as a substitute measure of achievement in a second-year Spanish culture and civilization class. Twenty students enrolled in a third-semester Spanish class at the University of Colorado were simultaneously given multiple choice tests and cloze tests…

  7. 40 CFR 90.508 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedures. 90.508 Section 90.508 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NONROAD SPARK-IGNITION ENGINES AT OR BELOW 19 KILOWATTS Selective Enforcement Auditing §...

  8. 40 CFR 91.607 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedures. 91.607 Section 91.607 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Selective Enforcement Auditing Regulations § 91.607...

  9. 75 FR 34653 - Engine-Testing Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 1065 Engine-Testing Procedures CFR Correction In Title 40 of the Code of Federal Regulations, Part 1000 to End, revised as of July 1, 2009, on page 587, in Sec. 1065.340, reinstate...

  10. General Mission Analysis Tool (GMAT) Acceptance Test Plan [Draft

    NASA Technical Reports Server (NTRS)

    Dove, Edwin; Hughes, Steve

    2007-01-01

    The information presented in this Acceptance Test Plan document shows the current status of the General Mission Analysis Tool (GMAT). GMAT is a software system developed by NASA Goddard Space Flight Center (GSFC) in collaboration with the private sector. The GMAT development team continuously performs acceptance tests in order to verify that the software continues to operate properly after updates are made. The GMAT Development team consists of NASA/GSFC Code 583 software developers, NASA/GSFC Code 595 analysts, and contractors of varying professions. GMAT was developed to provide a development approach that maintains involvement from the private sector and academia, encourages collaborative funding from multiple government agencies and the private sector, and promotes the transfer of technology from government funded research to the private sector. GMAT contains many capabilities, such as integrated formation flying modeling and MATLAB compatibility. The propagation capabilities in GMAT allow for fully coupled dynamics modeling of multiple spacecraft, in any flight regime. Other capabilities in GMAT inclucle: user definable coordinate systems, 3-D graphics in any coordinate system GMAT can calculate, 2-D plots, branch commands, solvers, optimizers, GMAT functions, planetary ephemeris sources including DE405, DE200, SLP and analytic models, script events, impulsive and finite maneuver models, and many more. GMAT runs on Windows, Mac, and Linux platforms. Both the Graphical User Interface (GUI) and the GMAT engine were built and tested on all of the mentioned platforms. GMAT was designed for intuitive use from both the GUI and with an importable script language similar to that of MATLAB.

  11. Type of Speech Material Affects Acceptable Noise Level Test Outcome

    PubMed Central

    Koch, Xaver; Dingemanse, Gertjan; Goedegebure, André; Janse, Esther

    2016-01-01

    The acceptable noise level (ANL) test, in which individuals indicate what level of noise they are willing to put up with while following speech, has been used to guide hearing aid fitting decisions and has been found to relate to prospective hearing aid use. Unlike objective measures of speech perception ability, ANL outcome is not related to individual hearing loss or age, but rather reflects an individual’s inherent acceptance of competing noise while listening to speech. As such, the measure may predict aspects of hearing aid success. Crucially, however, recent studies have questioned its repeatability (test–retest reliability). The first question for this study was whether the inconsistent results regarding the repeatability of the ANL test may be due to differences in speech material types used in previous studies. Second, it is unclear whether meaningfulness and semantic coherence of the speech modify ANL outcome. To investigate these questions, we compared ANLs obtained with three types of materials: the International Speech Test Signal (ISTS), which is non-meaningful and semantically non-coherent by definition, passages consisting of concatenated meaningful standard audiology sentences, and longer fragments taken from conversational speech. We included conversational speech as this type of speech material is most representative of everyday listening. Additionally, we investigated whether ANL outcomes, obtained with these three different speech materials, were associated with self-reported limitations due to hearing problems and listening effort in everyday life, as assessed by a questionnaire. ANL data were collected for 57 relatively good-hearing adult participants with an age range representative for hearing aid users. Results showed that meaningfulness, but not semantic coherence of the speech material affected ANL. Less noise was accepted for the non-meaningful ISTS signal than for the meaningful speech materials. ANL repeatability was comparable

  12. 40 CFR 600.111-08 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Test procedures. 600.111-08 Section... Model Year Automobiles-Test Procedures § 600.111-08 Test procedures. This section provides test procedures for the FTP, highway, US06, SC03, and the cold temperature FTP tests. Testing shall be...

  13. 40 CFR 600.111-08 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Test procedures. 600.111-08 Section... Emission Test Procedures § 600.111-08 Test procedures. This section provides test procedures for the FTP, highway, US06, SC03, and the cold temperature FTP tests. Testing shall be performed according to...

  14. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sampler's operating manual referred to in section 7.4.18 of 40 CFR part 50, appendix L. (2) Generate... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Static fractionator test. 53.64 Section 53.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)...

  15. Solar panel acceptance testing using a pulsed solar simulator

    NASA Technical Reports Server (NTRS)

    Hershey, T. L.

    1977-01-01

    Utilizing specific parameters as area of an individual cell, number in series and parallel, and established coefficient of current and voltage temperature dependence, a solar array irradiated with one solar constant at AMO and at ambient temperature can be characterized by a current-voltage curve for different intensities, temperatures, and even different configurations. Calibration techniques include: uniformity in area, depth and time, absolute and transfer irradiance standards, dynamic and functional check out procedures. Typical data are given for individual cell (2x2 cm) to complete flat solar array (5x5 feet) with 2660 cells and on cylindrical test items with up to 10,000 cells. The time and energy saving of such testing techniques are emphasized.

  16. 40 CFR 600.111-80 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Test procedures. 600.111-80 Section... Model Year Automobiles-Test Procedures § 600.111-80 Test procedures. (a) The test procedures to be...-78 of this chapter, as applicable. (The evaporative and refueling loss portions of the test...

  17. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Methods SO2, CO, O3, and NO2 § 53.23 Test procedures. (a) Range—(1) Technical definition. Nominal minimum... for 60 minutes. During this 60-minute interval, record twenty-five (25) readings at 2-minute intervals....5 4.08 O3 Spectrophotometric-gas phase .5 .5 3.5 4.08 CO Infrared 750 20,000 4 10 CO...

  18. 40 CFR 53.23 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Methods SO2, CO, O3, and NO2 § 53.23 Test procedures. (a) Range—(1) Technical definition. Nominal minimum... for 60 minutes. During this 60-minute interval, record twenty-five (25) readings at 2-minute intervals... Spectrophotometric-gas phase, including ultraviolet absorption and DOAS 0.5 0.5 0.5 4 0.08 0.02 20,000 CO...

  19. Rough handling tests. Final report on International Test Operations Procedure

    SciTech Connect

    Not Available

    1985-12-13

    This document provides test procedures to simulate the transportation of items carried as unsecured cargo in trucks, or on the person of Army personnel. Items include munitions, rifles, rockets, radios, and mortars. Vibration testing, airdrop capability, and airdrop capability of explosives are not covered in this ITOP. This ITOP provides guidance for testing the ability of military items to withstand the shocks encountered during transportation to or employment on the battlefield.

  20. Ultrasonic interface level analyzer shop test procedure

    SciTech Connect

    STAEHR, T.W.

    1999-05-24

    The Royce Instrument Corporation Model 2511 Interface Level Analyzer (URSILLA) system uses an ultrasonic ranging technique (SONAR) to measure sludge depths in holding tanks. Three URSILLA instrument assemblies provided by the W-151 project are planned to be used during mixer pump testing to provide data for determining sludge mobilization effectiveness of the mixer pumps and sludge settling rates. The purpose of this test is to provide a documented means of verifying that the functional components of the three URSILLA instruments operate properly. Successful completion of this Shop Test Procedure (STP) is a prerequisite for installation in the AZ-101 tank. The objective of the test is to verify the operation of the URSILLA instruments and to verify data collection using a stand alone software program.

  1. 118-B-1 excavation treatability test procedures

    SciTech Connect

    Frain, J.M.

    1994-08-01

    This treatability study has two purposes: to support development of the approach to be used for burial ground remediation, and to provide specific engineering information for the design of burial grounds receiving waste generated from the 100 Area removal actions. Data generated from this test will also provide performance and cost information necessary for detailed analysis of alternatives for burial ground remediation. Further details on the test requirements, milestones and data quality objectives are described in detail in the 118-B-1 Excavation Treatability Test Plan (DOE/RL-94-43). These working procedures are intended for use by field personnel to implement the requirements of the milestone. A copy of the detailed Test Plan will be kept on file at the on-site field support trailer, and will be available for review by field personnel.

  2. Overcoming Denial through the Group: A Test of Acceptance Theory.

    ERIC Educational Resources Information Center

    Rugel, Robert P.; Barry, Denise

    1990-01-01

    Found participants (N=28) in alcohol treatment groups showed decreases in denial of drinking problems and decreases in psychopathology following 12 weeks of group counseling. Determined greater self-acceptance was associated with experiencing acceptance by group and with greater decreases in denial; decreases in denial and psychopathology were…

  3. 40 CFR 92.123 - Test procedure; general requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedure; general requirements... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.123 Test procedure; general requirements. (a) The locomotive/locomotive engine test procedure...

  4. 40 CFR 92.123 - Test procedure; general requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Test procedure; general requirements... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.123 Test procedure; general requirements. (a) The locomotive/locomotive engine test procedure...

  5. 40 CFR 86.608-98 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Test procedures. 86.608-98 Section 86... New Light-Duty Vehicles, Light-Duty Trucks, and Heavy-Duty Vehicles § 86.608-98 Test procedures. (a) The prescribed test procedures are the Federal Test Procedure, as described in subpart B of this...

  6. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Test procedures. 86.884-5 Section 86... Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of engines with...

  7. 40 CFR 86.884-5 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Test procedures. 86.884-5 Section 86... New Diesel Heavy-Duty Engines; Smoke Exhaust Test Procedure § 86.884-5 Test procedures. The procedures described in this and subsequent sections will be the test program to determine the conformity of...

  8. 40 CFR 86.608-98 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Test procedures. 86.608-98 Section 86... Auditing of New Light-Duty Vehicles, Light-Duty Trucks, and Heavy-Duty Vehicles § 86.608-98 Test procedures. (a) The prescribed test procedures are the Federal Test Procedure, as described in subpart B...

  9. 40 CFR 600.111-80 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Test procedures. 600.111-80 Section... Emission Regulations for 1978 and Later Model Year Automobiles-Test Procedures § 600.111-80 Test procedures. (a) The test procedures to be followed for generation of the city fuel economy data are...

  10. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Test procedures. 86.425-78 Section 86... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test procedures are found in subpart F. (b) The Administrator may prescribe emission test procedures for...

  11. 40 CFR 600.111-08 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Test procedures. 600.111-08 Section... Emission Regulations for 1978 and Later Model Year Automobiles-Test Procedures § 600.111-08 Test procedures. This section provides test procedures for the FTP, highway, US06, SC03, and the cold temperature...

  12. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Test procedures. 86.425-78 Section 86... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test procedures are found in subpart F. (b) The Administrator may prescribe emission test procedures for...

  13. Social trust, risk perceptions and public acceptance of recycled water: testing a social-psychological model.

    PubMed

    Ross, Victoria L; Fielding, Kelly S; Louis, Winnifred R

    2014-05-01

    Faced with a severe drought, the residents of the regional city of Toowoomba, in South East Queensland, Australia were asked to consider a potable wastewater reuse scheme to supplement drinking water supplies. As public risk perceptions and trust have been shown to be key factors in acceptance of potable reuse projects, this research developed and tested a social-psychological model of trust, risk perceptions and acceptance. Participants (N = 380) were surveyed a few weeks before a referendum was held in which residents voted against the controversial scheme. Analysis using structural equation modelling showed that the more community members perceived that the water authority used fair procedures (e.g., consulting with the community and providing accurate information), the greater their sense of shared identity with the water authority. Shared social identity in turn influenced trust via increased source credibility, that is, perceptions that the water authority is competent and has the community's interest at heart. The findings also support past research showing that higher levels of trust in the water authority were associated with lower perceptions of risk, which in turn were associated with higher levels of acceptance, and vice versa. The findings have a practical application for improving public acceptance of potable recycled water schemes. PMID:24603028

  14. Comparison of acceptance, preference and efficacy between pressure anesthesia and classical needle infiltration anesthesia for dental restorative procedures in adult patients

    PubMed Central

    Makade, Chetana Sachin; Shenoi, Pratima R; Gunwal, Mohit K

    2014-01-01

    Introduction: Intraoral local anesthesia is essential for delivering dental care. Needless devices have been developed to provide anesthesia without injections. Little controlled research is available on its use in dental restorative procedures in adult patients. The aims of this study were to compare adult patients acceptability and preference for needleless jet injection with classical local infiltration as well as to evaluate the efficacy of the needleless anesthesia. Materials and Methods: Twenty non fearful adults with no previous experience of dental anesthesia were studied using split-mouth design. The first procedure was performed with classical needle infiltration anesthesia. The same amount of anesthetic solution was administered using MADA jet needleless device in a second session one week later, during which a second dental restorative procedure was performed. Patients acceptance was assessed using Universal pain assessment tool while effectiveness was recorded using soft tissue anesthesia and pulpal anesthesia. Patients reported their preference for the anesthetic method at the third visit. The data was evaluated using chi square test and student's t-test. Results: Pressure anesthesia was more accepted and preferred by 70% of the patients than traditional needle anesthesia (20%). Both needle and pressure anesthesia was equally effective for carrying out the dental procedures. Conclusion: Patients experienced significantly less pain and fear (p<0.01) during anesthetic procedure with pressure anesthesia. However, for more invasive procedures needle anesthesia will be more effective. PMID:24778516

  15. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... 46 Shipping 2 2012-10-01 2012-10-01 false Weld toughness test acceptance criteria....

  16. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... 46 Shipping 2 2014-10-01 2014-10-01 false Weld toughness test acceptance criteria....

  17. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy V-notch impact tests the energy absorbed in both the weld metal and heat affected zone impact tests in weld... 46 Shipping 2 2013-10-01 2013-10-01 false Weld toughness test acceptance criteria....

  18. 49 CFR 232.505 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Pre-revenue service acceptance testing plan. 232... § 232.505 Pre-revenue service acceptance testing plan. (a) General; submission of plan. Except as... its system the operating railroad or railroads shall submit a pre-revenue service acceptance...

  19. Utility-Scale Parabolic Trough Solar Systems: Performance Acceptance Test Guidelines, April 2009 - December 2010

    SciTech Connect

    Kearney, D.

    2011-05-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The Guidelines contained here are specifically written for parabolic trough collector systems with a heat-transport system using a high-temperature synthetic oil, but the basic principles are relevant to other CSP systems.

  20. Acceptance Performance Test Guideline for Utility Scale Parabolic Trough and Other CSP Solar Thermal Systems: Preprint

    SciTech Connect

    Mehos, M. S.; Wagner, M. J.; Kearney, D. W.

    2011-08-01

    Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. Progress on interim guidelines was presented at SolarPACES 2010. Significant additions and modifications were made to the guidelines since that time, resulting in a final report published by NREL in April 2011. This paper summarizes those changes, which emphasize criteria for assuring thermal equilibrium and steady state conditions within the solar field.

  1. Reliability test procedures for tunable lasers

    NASA Astrophysics Data System (ADS)

    Ciminelli, Caterina; Armenise, Mario Nicola; Passaro, Vittorio M. N.

    2003-04-01

    Widely tunable lasers are promising sources for future high-capacity dense wavelength divison multiplexing and photonic switching systems. These devices can be used for sparing in the cold standby mode, restoring in hot standby restoring, rerouting wavelength rerouting or conversion, or fast switching in all-optical networks. Tunable lasers need to demonstrate some featuers such as wide tunability range, optical output power of 10 dBm or more, cost and structure similar to those of commercial DFB lasers. High performance devices would require low laser chirp, high modulation speed, small size and very high reliability. For system applications, requirements on the tunable laser reliability are very stringent. Reliability studies and appropriate related testing procedures are necessary to define stability of tunable lasers and their expected lifetime. In this paper we propose some reliabilty test 'strategies' useful for qualification of tunable lasers with reference to some critical issues of the main technologies used to achieve the tunability feature.

  2. INERT Atmosphere confinement operability test procedure

    SciTech Connect

    RISENMAY, H.R.

    1999-02-22

    This Operability Test Procedure (OTP) provides instructions for testing operability of the Inert Atmosphere Confinement (IAC). The Inert Atmosphere Confinement was designed and built for opening cans of metal items that might have hydrided surfaces. Unreviewed Safety Question (USQ) PFP-97-005 addresses the discovery of suspected plutonium hydride forming on plutonium metal currently stored in the Plutonium Finishing Plant vaults. Plutonium hydride reacts quickly with air, liberating energy. The Inert Atmosphere Confinement was designed to prevent this sudden liberation of energy by opening the material in an inert argon atmosphere instead of the normal glovebox atmosphere. The IAC is located in glovebox HC-21A, room 230B of the 234-5Z Building at the Plutonium Finishing Plant (PFP) in the 200-West Area of the Hanford Site.

  3. 40 CFR 89.404 - Test procedure overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Test procedure overview. 89.404... Test Procedures § 89.404 Test procedure overview. (a) The test consists of prescribed sequences of.... The test is applicable to engines equipped with catalytic or direct-flame afterburners,...

  4. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test... motorcycle which he determines is not susceptible to satisfactory testing by the procedures set forth...

  5. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test... motorcycle which he determines is not susceptible to satisfactory testing by the procedures set forth...

  6. 40 CFR 86.425-78 - Test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Later New Motorcycles, General Provisions § 86.425-78 Test procedures. (a) Motorcycle emission test... motorcycle which he determines is not susceptible to satisfactory testing by the procedures set forth...

  7. 76 FR 27016 - Evaluating Test Procedures for Voting Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... National Institute of Standards and Technology Evaluating Test Procedures for Voting Systems AGENCY... assess NIST's test procedures for voting equipment. Manufacturers interested in participating in this... for certification) by the Election Assistance Commission to develop and assess NIST test protocols...

  8. 40 CFR 60.474 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Test methods and procedures. 60.474... Processing and Asphalt Roofing Manufacture § 60.474 Test methods and procedures. (a) For saturators, the... methods and procedures the test methods in appendix A of this part or other methods and procedures...

  9. 40 CFR 136.4 - Application for alternate test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... alternate testing procedure is being requested. (3) Provide justification for using testing procedures other... procedure to the effluents in question. (d) An application for approval of an alternate test procedure for... paragraph (d) shall: (1) Provide the name and address of the responsible person or firm making...

  10. The Careful Puppet Master: Reducing risk and fortifying acceptance testing with Jenkins CI

    NASA Astrophysics Data System (ADS)

    Smith, Jason A.; Richman, Gabriel; DeStefano, John; Pryor, James; Rao, Tejas; Strecker-Kellogg, William; Wong, Tony

    2015-12-01

    Centralized configuration management, including the use of automation tools such as Puppet, can greatly increase provisioning speed and efficiency when configuring new systems or making changes to existing systems, reduce duplication of work, and improve automated processes. However, centralized management also brings with it a level of inherent risk: a single change in just one file can quickly be pushed out to thousands of computers and, if that change is not properly and thoroughly tested and contains an error, could result in catastrophic damage to many services, potentially bringing an entire computer facility offline. Change management procedures can—and should—be formalized in order to prevent such accidents. However, like the configuration management process itself, if such procedures are not automated, they can be difficult to enforce strictly. Therefore, to reduce the risk of merging potentially harmful changes into our production Puppet environment, we have created an automated testing system, which includes the Jenkins CI tool, to manage our Puppet testing process. This system includes the proposed changes and runs Puppet on a pool of dozens of RedHat Enterprise Virtualization (RHEV) virtual machines (VMs) that replicate most of our important production services for the purpose of testing. This paper describes our automated test system and how it hooks into our production approval process for automatic acceptance testing. All pending changes that have been pushed to production must pass this validation process before they can be approved and merged into production.

  11. 16 CFR Table 3 to Part 1512 - Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test Procedure 3 Table 3 to Part 1512 Commercial Practices... Retroreflective Tire and Rim Test Procedure Observation angle (degrees) Entrance angle (degrees)...

  12. 16 CFR Table 3 to Part 1512 - Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test Procedure 3 Table 3 to Part 1512 Commercial Practices... Retroreflective Tire and Rim Test Procedure Observation angle (degrees) Entrance angle (degrees)...

  13. 16 CFR Table 3 to Part 1512 - Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test Procedure 3 Table 3 to Part 1512 Commercial Practices... Retroreflective Tire and Rim Test Procedure Observation angle (degrees) Entrance angle (degrees)...

  14. 16 CFR Table 3 to Part 1512 - Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test Procedure 3 Table 3 to Part 1512 Commercial Practices... Retroreflective Tire and Rim Test Procedure Observation angle (degrees) Entrance angle (degrees)...

  15. 16 CFR Table 3 to Part 1512 - Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Minimum Acceptable Values for the Quantity A Defined in the Retroreflective Tire and Rim Test Procedure 3 Table 3 to Part 1512 Commercial Practices... Retroreflective Tire and Rim Test Procedure Observation angle (degrees) Entrance angle (degrees)...

  16. Project W-314 acceptance test report HNF-4651 for HNF-4650 SN-268 encasement leak detection ANA-WT-LDSTA-335 for project W-314

    SciTech Connect

    HAMMERS, J.S.

    1999-09-30

    The purpose of the test was to verify that the AN Tank Farm Encasement Leak Detector components are functionally integrated and operate in accordance with engineering design specifications The Acceptance Test Procedure HNF-4650, SN-268 Encasement Leak Detection ANA-W-LDSTA-335, was conducted between 22 June and 01 July 1999 at the 200E AN Tank Farm. The test has been completed with no open test exceptions The test was conducted prior to final engineering ''as built'' activities being completed this had no impact on the procedure or test results. All components, identified in the procedure, were found to be labeled and identified as written in the procedure.

  17. 40 CFR 92.604 - In-use test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false In-use test procedure. 92.604 Section... test procedure. (a) Testing conducted under this subpart shall be conducted on locomotives; testing... time of testing. (b) Locomotives tested under this subpart shall be tested using the locomotive...

  18. 40 CFR 92.604 - In-use test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false In-use test procedure. 92.604 Section... test procedure. (a) Testing conducted under this subpart shall be conducted on locomotives; testing... time of testing. (b) Locomotives tested under this subpart shall be tested using the locomotive...

  19. Proposed acceptance, qualification, and characterization tests for thin-film PV modules

    NASA Technical Reports Server (NTRS)

    Waddington, D.; Mrig, L.; Deblasio, R.; Ross, R.

    1988-01-01

    Details of a proposed test program for PV thin-film modules which the Department of Energy has directed the Solar Energy Research Institute (SERI) to prepare are presented. Results of one of the characterization tests that SERI has performed are also presented. The objective is to establish a common approach to testing modules that will be acceptable to both users and manufacturers. The tests include acceptance, qualification, and characterization tests. Acceptance tests verify that randomly selected modules have similar characteristics. Qualification tests are based on accelerated test methods designed to simulate adverse conditions. Characterization tests provide data on performance in a predefined environment.

  20. A data base and a standard material for use in acceptance testing of low-activity waste products

    SciTech Connect

    Wolf, S.F.; Ebert, W.L.; Luo, J.S.; Strachan, D.M.

    1998-04-01

    The authors have conducted replicate dissolution tests following the product consistency test (PCT) procedure to measure the mean and standard deviation of the solution concentrations of B, Na, and Si at various combinations of temperature, duration, and glass/water mass ratio. Tests were conducted with a glass formulated to be compositionally similar to low-activity waste products anticipated for Hanford to evaluate the adequacy of test methods that have been designated in privatization contracts for use in product acceptance. An important finding from this set of tests is that the solution concentrations generated in tests at 20 C will likely be too low to measure the dissolution rates of waste products reliably. Based on these results, the authors recommend that the acceptance test be conducted at 40 C. Tests at 40 C generated higher solution concentrations, were more easily conducted, and the measured rates were easily related to those at 20 C. Replicate measurements of other glass properties were made to evaluate the possible use of LRM-1 as a standard material. These include its composition, homogeneity, density, compressive strength, the Na leachability index with the ANSI/ANS 16.1 leach test, and if the glass is characteristically hazardous with the toxicity characteristic leach procedure. The values of these properties were within the acceptable limits identified for Hanford low-activity waste products. The reproducibility of replicate tests and analyses indicates that the glass would be a suitable standard material.

  1. 40 CFR 60.64 - Test methods and procedures

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures 60.64... Plants § 60.64 Test methods and procedures (a) In conducting the performance tests required in § 60.8, you must use reference methods and procedures and the test methods in appendix A of this part or...

  2. 40 CFR 60.74 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.74... Plants § 60.74 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A...

  3. 40 CFR 60.54 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.54... § 60.54 Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of...

  4. 40 CFR 91.404 - Test procedure overview.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedure overview. 91.404 Section 91.404 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.404 Test procedure overview. (a) The test consists...

  5. 40 CFR 60.534 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... prior to the schedule or revised test dates will result in voiding the notification. In the case of a... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.534... Wood Heaters § 60.534 Test methods and procedures. Test methods and procedures in appendix A of...

  6. 40 CFR 60.144a - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.144a... 20, 1983 § 60.144a Test methods and procedures. (a) In conducting the performance tests required in § 60.8, the owner or operator shall use as reference methods and procedures the test methods...

  7. 40 CFR 91.404 - Test procedure overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Test procedure overview. 91.404... (CONTINUED) CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES Gaseous Exhaust Test Procedures § 91.404 Test procedure overview. (a) The test consists of prescribed sequences of engine operating...

  8. 40 CFR 87.62 - Test procedure (propulsion engines).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Test procedure (propulsion engines... PROGRAMS (CONTINUED) Definitions. Test Procedures § 87.62 Test procedure (propulsion engines). Link to an amendment published at 77 FR 36386, June 18, 2012. (a)(1) The engine shall be tested in each of...

  9. 40 CFR 86.1227-96 - Test procedures; overview.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Test procedures; overview. 86.1227-96... Emission Test Procedures for New Gasoline-Fueled, Natural Gas-Fueled, Liquefied Petroleum Gas-Fueled and Methanol-Fueled Heavy-Duty Vehicles § 86.1227-96 Test procedures; overview. (a) The overall test...

  10. Laboratory procedures for waste form testing

    SciTech Connect

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  11. 78 FR 53484 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... COMMISSION Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4... acceptance criteria (ITAAC) completion. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has... acceptance criteria are met for ITAAC E.2.5.04.05.05.02, for the Vogtle Electric Generating Plant, Unit...

  12. 78 FR 53483 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... COMMISSION Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3... acceptance criteria (ITAAC) completion. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has... acceptance criteria are met for ITAAC E.2.5.04.05.05.02, for the Vogtle Electric Generating Plant, Unit...

  13. For your interest? The ethical acceptability of using non-invasive prenatal testing to test 'purely for information'.

    PubMed

    Deans, Zuzana; Clarke, Angus J; Newson, Ainsley J

    2015-01-01

    Non-invasive prenatal testing (NIPT) is an emerging form of prenatal genetic testing that provides information about the genetic constitution of a foetus without the risk of pregnancy loss as a direct result of the test procedure. As with other prenatal tests, information from NIPT can help to make a decision about termination of pregnancy, plan contingencies for birth or prepare parents to raise a child with a genetic condition. NIPT can also be used by women and couples to test purely 'for information'. Here, no particular action is envisaged following the test; it is motivated entirely by an interest in the result. The fact that NIPT can be performed without posing a risk to the pregnancy could give rise to an increase in such requests. In this paper, we examine the ethical aspects of using NIPT 'purely for information', including the competing interests of the prospective parents and the future child, and the acceptability of testing for 'frivolous' reasons. Drawing on several clinical scenarios, we claim that arguments about testing children for genetic conditions are relevant to this debate. In addition, we raise ethical concerns over the potential for objectification of the child. We conclude that, in most cases, using NIPT to test for adult-onset conditions, carrier status or non-serious traits presenting in childhood would be unacceptable. PMID:25521970

  14. School age test or procedure preparation

    MedlinePlus

    ... your child understands, and use real terms. Avoid abstract terms. Make sure your child understands the exact ... be able to identify concerns through your child's art. DURING THE PROCEDURE If the procedure is performed ...

  15. Acceptance and operability test report for the 327 building retention process sewer diverter station

    SciTech Connect

    Olander, A.R.

    1996-09-04

    This test report includes the results of acceptance and operability testing of the 327 building diverter station. The test included steps for flushing, calibrating, and operating the system on backup power.

  16. Interim solar cell testing procedures for terrestrial applications

    NASA Technical Reports Server (NTRS)

    Brandhorst, H. W., Jr.; Hickey, J.; Curtis, H.

    1975-01-01

    This report presents an interim draft of procedures for testing solar cells for terrestrial applications that resulted from the terrestrial photovoltaic workshop sessions. A final version of the test procedures manual is planned for the summer of 1976.

  17. 10 CFR 431.282 - Test Procedures [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Test Procedures 431.282 Section 431.282 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL.... Test Procedures Energy Conservation Standards...

  18. 10 CFR 431.282 - Test Procedures [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test Procedures 431.282 Section 431.282 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL.... Test Procedures Energy Conservation Standards...

  19. 10 CFR 431.282 - Test Procedures [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Test Procedures 431.282 Section 431.282 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL.... Test Procedures Energy Conservation Standards...

  20. 10 CFR 431.282 - Test Procedures [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Test Procedures 431.282 Section 431.282 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL.... Test Procedures Energy Conservation Standards...

  1. 10 CFR 431.282 - Test Procedures [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Test Procedures 431.282 Section 431.282 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL.... Test Procedures Energy Conservation Standards...

  2. W-026, acceptance test report fire alarm system (submittal number 1571.1)

    SciTech Connect

    Watson, T.L., Westinghouse Hanford

    1996-12-16

    This Acceptance Test Report was written by 3-D Protection Systems, Inc., and PCL Construction. WRAP I Facility Engineering, Solid Waste Fire Safety, Kaiser Acceptance Inspector and Hanford Fire Department personnel witnessed this test. All exceptions were resolved. The resolutions are attached. Contractor`s Material and Test Certificates are attached. Results from Solid Waste Industrial Hygiene sound level surveys are also included.

  3. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Weld toughness test acceptance criteria. 54.05-17 Section 54.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy...

  4. 46 CFR 54.05-17 - Weld toughness test acceptance criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Weld toughness test acceptance criteria. 54.05-17 Section 54.05-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Toughness Tests § 54.05-17 Weld toughness test acceptance criteria. (a) For Charpy...

  5. Flight test pilot evaluation of a delayed flap approach procedure

    NASA Technical Reports Server (NTRS)

    Bull, J. S.; Edwards, F. G.; Foster, J. D.; Hegarty, D. M.; Drinkwater, F. J., III

    1977-01-01

    Using NASA's CV-990 aircraft, a delayed flap approach procedure was demonstrated to nine guest pilots from the air transport industry. Four demonstration flights and 37 approaches were conducted under VFR weather conditions. A limited pilot evaluation of the delayed flap procedure was obtained from pilot comments and from questionaires they completed. Pilot acceptability, pilot workload, and ATC compatibility were quantitatively rated. The delayed flap procedure was shown to be feasible, and suggestions for further development work were obtained.

  6. 40 CFR 92.103 - Test procedures; overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedures; overview. 92.103 Section 92.103 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.103 Test procedures; overview. (a) This subpart...

  7. 40 CFR 89.404 - Test procedure overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedure overview. 89.404 Section 89.404 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.404 Test procedure overview....

  8. 21 CFR 1010.13 - Special test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Special test procedures. 1010.13 Section 1010.13 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) RADIOLOGICAL HEALTH PERFORMANCE STANDARDS FOR ELECTRONIC PRODUCTS: GENERAL Alternate Test Procedures § 1010.13 Special test procedures. The...

  9. 40 CFR 92.123 - Test procedure; general requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedure; general requirements. 92.123 Section 92.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.123 Test procedure; general requirements....

  10. 40 CFR 92.103 - Test procedures; overview.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedures; overview. 92.103 Section 92.103 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.103 Test procedures; overview. (a) This subpart...

  11. 40 CFR 89.404 - Test procedure overview.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Test procedure overview. 89.404 Section 89.404 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.404 Test procedure overview....

  12. 40 CFR 136.3 - Identification of test procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Identification of test procedures. 136.3 Section 136.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) GUIDELINES ESTABLISHING TEST PROCEDURES FOR THE ANALYSIS OF POLLUTANTS § 136.3 Identification of test procedures. (a) Parameters...

  13. 40 CFR 89.404 - Test procedure overview.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Test procedure overview. 89.404 Section 89.404 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.404 Test procedure overview....

  14. 40 CFR 92.103 - Test procedures; overview.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Test procedures; overview. 92.103 Section 92.103 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.103 Test procedures; overview. (a) This subpart...

  15. 40 CFR 90.404 - Test procedure overview.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Test procedure overview. 90.404 Section 90.404 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NONROAD SPARK-IGNITION ENGINES AT OR BELOW 19 KILOWATTS Gaseous Exhaust Test Procedures § 90.404 Test procedure...

  16. 40 CFR 92.103 - Test procedures; overview.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedures; overview. 92.103 Section 92.103 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Test Procedures § 92.103 Test procedures; overview. (a) This subpart...

  17. 40 CFR 89.404 - Test procedure overview.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedure overview. 89.404 Section 89.404 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.404 Test procedure overview....

  18. 40 CFR 87.62 - Test procedure (propulsion engines).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Test procedure (propulsion engines... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM AIRCRAFT AND AIRCRAFT ENGINES Test Procedures for Engine Exhaust Gaseous Emissions (Aircraft and Aircraft Gas Turbine Engines) § 87.62 Test procedure...

  19. 49 CFR 655.51 - Compliance with testing procedures requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... IN TRANSIT OPERATIONS Drug and Alcohol Testing Procedures § 655.51 Compliance with testing procedures requirements. The drug and alcohol testing procedures in 49 CFR Part 40 apply to employers covered by this part.... 655.51 Section 655.51 Transportation Other Regulations Relating to Transportation (Continued)...

  20. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 30 2012-07-01 2012-07-01 false Test procedures for measurement. 401... GUIDELINES AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures for measurement which are prescribed at part 136 of this chapter shall apply to expressions of pollutant...

  1. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 30 2013-07-01 2012-07-01 true Test procedures for measurement. 401.13... AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures for measurement which are prescribed at part 136 of this chapter shall apply to expressions of pollutant...

  2. 40 CFR 87.62 - Test procedure (propulsion engines).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Test procedure (propulsion engines... PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM AIRCRAFT AND AIRCRAFT ENGINES Test Procedures for Engine Exhaust Gaseous Emissions (Aircraft and Aircraft Gas Turbine Engines) § 87.62 Test procedure...

  3. 20 CFR 416.919m - Diagnostic tests or procedures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Diagnostic tests or procedures. 416.919m... for Report Content § 416.919m Diagnostic tests or procedures. We will request the results of any diagnostic tests or procedures that have been performed as part of a workup by your treating source or...

  4. 20 CFR 404.1519m - Diagnostic tests or procedures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Diagnostic tests or procedures. 404.1519m... Report Content § 404.1519m Diagnostic tests or procedures. We will request the results of any diagnostic... will not order diagnostic tests or procedures that involve significant risk to you, such as...

  5. 20 CFR 404.1519m - Diagnostic tests or procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Diagnostic tests or procedures. 404.1519m... Report Content § 404.1519m Diagnostic tests or procedures. We will request the results of any diagnostic... will not order diagnostic tests or procedures that involve significant risk to you, such as...

  6. 20 CFR 416.919m - Diagnostic tests or procedures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Diagnostic tests or procedures. 416.919m... for Report Content § 416.919m Diagnostic tests or procedures. We will request the results of any diagnostic tests or procedures that have been performed as part of a workup by your treating source or...

  7. 20 CFR 404.1519m - Diagnostic tests or procedures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Diagnostic tests or procedures. 404.1519m... Report Content § 404.1519m Diagnostic tests or procedures. We will request the results of any diagnostic... will not order diagnostic tests or procedures that involve significant risk to you, such as...

  8. 20 CFR 416.919m - Diagnostic tests or procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Diagnostic tests or procedures. 416.919m... for Report Content § 416.919m Diagnostic tests or procedures. We will request the results of any diagnostic tests or procedures that have been performed as part of a workup by your treating source or...

  9. 20 CFR 404.1519m - Diagnostic tests or procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Diagnostic tests or procedures. 404.1519m... Report Content § 404.1519m Diagnostic tests or procedures. We will request the results of any diagnostic... will not order diagnostic tests or procedures that involve significant risk to you, such as...

  10. 20 CFR 416.919m - Diagnostic tests or procedures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Diagnostic tests or procedures. 416.919m... for Report Content § 416.919m Diagnostic tests or procedures. We will request the results of any diagnostic tests or procedures that have been performed as part of a workup by your treating source or...

  11. 20 CFR 404.1519m - Diagnostic tests or procedures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Diagnostic tests or procedures. 404.1519m... Report Content § 404.1519m Diagnostic tests or procedures. We will request the results of any diagnostic... will not order diagnostic tests or procedures that involve significant risk to you, such as...

  12. 20 CFR 416.919m - Diagnostic tests or procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Diagnostic tests or procedures. 416.919m... for Report Content § 416.919m Diagnostic tests or procedures. We will request the results of any diagnostic tests or procedures that have been performed as part of a workup by your treating source or...

  13. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 29 2014-07-01 2012-07-01 true Test procedures for measurement. 401.13 Section 401.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures...

  14. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Test procedures for measurement. 401.13 Section 401.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures...

  15. 40 CFR 401.13 - Test procedures for measurement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 29 2011-07-01 2009-07-01 true Test procedures for measurement. 401.13 Section 401.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS GENERAL PROVISIONS § 401.13 Test procedures for measurement. The test procedures...

  16. 40 CFR 80.51 - Vehicle test procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emissions tests, dynamometer procedure per 40 CFR 86.137-90 with: (1) Exhaust Benzene and 1,3-Butadiene... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Vehicle test procedures. 80.51 Section...) REGULATION OF FUELS AND FUEL ADDITIVES Reformulated Gasoline § 80.51 Vehicle test procedures. The...

  17. 46 CFR 164.009-15 - Test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Test procedure. 164.009-15 Section 164.009-15 Shipping...: SPECIFICATIONS AND APPROVAL MATERIALS Noncombustible Materials for Merchant Vessels § 164.009-15 Test procedure. (a) General. Paragraphs (b) through (k) of this section contain the test procedures for each...

  18. 46 CFR 130.480 - Test procedure and operations manual.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Test procedure and operations manual. 130.480 Section....480 Test procedure and operations manual. (a) A procedure for tests to be conducted on automated... detailed operations manual that describes the operation and indicates the location of each system...

  19. 40 CFR 92.123 - Test procedure; general requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Test procedure; general requirements. 92.123 Section 92.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR....123 Test procedure; general requirements. (a) The locomotive/locomotive engine test procedure...

  20. SU-E-P-46: Clinical Acceptance Testing and Implementation of a Portable CT Unit

    SciTech Connect

    LaFrance, M; Marsh, S; Hicks, R; O’Donnell-Moran, G

    2015-06-15

    Purpose: Planning for the first installation in New England of a new portable CT unit to be used in the Operating Room required the integration of many departments including Surgery, Neurosurgery, Information Services, Clinical Engineering, Radiology and Medical Physics/Radiation Safety. Acceptance testing and the quality assurance procedures were designed to optimize image quality and patient and personnel radiation exposure. Methods: The vendor’s protocols were tested using the CT Dosimetry phantoms. The system displayed the CTDIw instead of the CTDIvol while testing the unit. Radiation exposure was compared to existing CT scanners from installed CT units throughout the facility. Brainlab measures all 4 periphery slots on the CT Dosimetry phantom. The ACR measures only the superior slot for the periphery measurement. A comprehensive radiation survey was also performed for several locations. Results: The CTDIvol measurements were comparable for the following studies: brain, C-Spine, and sinuses. However, the mobile CT measurements were slightly higher than other CT units but within acceptable tolerance if measured using the ACR method.Based on scatter measurements, it was determined if any personnel were to stay in the OR Suite during image acquisition that the appropriate lead apron and thyroid shields had to be worn.In addition, to reduce unnecessary scatter, there were two mobile 6 foot wide shields (1/16″ lead equivalent) available to protect personnel in the room and adjacent areas. Conclusion: Intraoperative CT provides the physician new opportunities for evaluation of the progression of surgical resections and device placement at the cost of increasing the amount of trained personnel required to perform this procedure. It also brings with it challenges to keep the radiation exposure to the patients and staff within reasonable limits.

  1. 40 CFR 1033.410 - In-use test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false In-use test procedure. 1033.410... CONTROLS CONTROL OF EMISSIONS FROM LOCOMOTIVES In-use Testing § 1033.410 In-use test procedure. (a) You must test the complete locomotives; you may not test engines that are not installed in locomotives...

  2. 40 CFR 1033.410 - In-use test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false In-use test procedure. 1033.410... CONTROLS CONTROL OF EMISSIONS FROM LOCOMOTIVES In-use Testing § 1033.410 In-use test procedure. (a) You must test the complete locomotives; you may not test engines that are not installed in locomotives...

  3. End User Acceptance - Requirements or Specifications, Certification, Testing

    NASA Technical Reports Server (NTRS)

    Jeevarajan, Judith

    2013-01-01

    NASA follows top level safety requirement of two-failure tolerance (t hree levels of controls or design for minimum risk) to all catastroph ic hazards in the design of safe li-ion batteries for space use. ? R igorous development testing at appropriate levels to credible offnominal conditions and review of test data. ? Implement robust design con trols based on test results and test again to confirm safety at the a ppropriate levels. ? Stringent testing of all (100%) flight batteries (from button cells to large batteries).

  4. 40 CFR 90.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Post-test analyzer procedures. 90.411... Test Procedures § 90.411 Post-test analyzer procedures. (a) Perform a HC hang-up check within 60...), the test is void. (d) Read and record the post-test data specified in § 90.405(e). (e) For a...

  5. 49 CFR 238.111 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Pre-revenue service acceptance testing plan. 238... and General Requirements § 238.111 Pre-revenue service acceptance testing plan. (a) Passenger equipment that has previously been used in revenue service in the United States. For passenger...

  6. 49 CFR 238.111 - Pre-revenue service acceptance testing plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Pre-revenue service acceptance testing plan. 238.111 Section 238.111 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL... and General Requirements § 238.111 Pre-revenue service acceptance testing plan. (a)...

  7. 78 FR 65007 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ...The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC), 2.1.03.11 for the Vogtle Electric Generating Plant, Unit...

  8. Project B610 process control configuration acceptance test report

    SciTech Connect

    Silvan, G.R.

    1995-06-27

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: (1) proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; (2) proper operation of all display data on the operators` console; (3) proper operation of all required alarms; and (4) proper operation of all required interlocks. This test only verifies the proper operation of the Westinghouse control configuration (or program). It will not be responsible for verifying proper operation of the MICON hardware or operating software. Neither does it test any of the B610 instrument. The MICON hardware and software has been tested as part of the equipment procurement. Instrumentation and wiring installed under project B620 will be tested under a separate functional test. In some cases, precise transmitter ranges, alarm setpoints, and controller tuning parameters are not available at this time. Therefore, approximate values are used during the test. This should not affect the proper operation of the configuration or the validity of this test. Final values will be assigned during operability testing.

  9. 46 CFR 164.023-11 - Acceptance tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... identification tests are conducted: (1) The average length/weight ratio of the thread in meters per kilogram... analysis, thermogravimetric analysis, differential scanning calorimeter, or other equivalent means...

  10. 42 CFR 426.400 - Procedure for filing an acceptable complaint concerning a provision (or provisions) of an LCD.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Procedure for filing an acceptable complaint concerning a provision (or provisions) of an LCD. 426.400 Section 426.400 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM (CONTINUED) REVIEW OF NATIONAL COVERAGE...

  11. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... operation of the over-the-pool monitor, alarms, and interlocks required by § 36.29(b). (f) Source rack. For panoramic irradiators, the licensee shall test the movement of the source racks for proper operation prior to source loading; testing must include source rack lowering due to simulated loss of power. For...

  12. 40 CFR 1066.840 - Highway fuel economy test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... described in 40 CFR part 86, subpart S, and in 40 CFR part 600. See § 1066.801 for further information on... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Highway fuel economy test procedure... Highway fuel economy test procedure. This section describes the procedure for the highway fuel...

  13. 47 CFR 11.61 - Tests of EAS procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Tests of EAS procedures. 11.61 Section 11.61 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL EMERGENCY ALERT SYSTEM (EAS) Tests § 11.61 Tests of EAS procedures. (a) EAS Participants shall conduct tests at regular intervals, as specified in paragraphs (a)(1) and (a)(2) of this...

  14. 32 CFR 634.35 - Chemical testing policies and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Chemical testing policies and procedures. 634.35... Chemical testing policies and procedures. (a) Validity of chemical testing. Results of chemical testing are... instruction manual. (iv) Perform preventive maintenance as required by the instruction manual. (c)...

  15. 32 CFR 634.35 - Chemical testing policies and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Chemical testing policies and procedures. 634.35... Chemical testing policies and procedures. (a) Validity of chemical testing. Results of chemical testing are... instruction manual. (iv) Perform preventive maintenance as required by the instruction manual. (c)...

  16. 32 CFR 634.35 - Chemical testing policies and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Chemical testing policies and procedures. 634.35... Chemical testing policies and procedures. (a) Validity of chemical testing. Results of chemical testing are... instruction manual. (iv) Perform preventive maintenance as required by the instruction manual. (c)...

  17. 32 CFR 634.35 - Chemical testing policies and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Chemical testing policies and procedures. 634.35... Chemical testing policies and procedures. (a) Validity of chemical testing. Results of chemical testing are... instruction manual. (iv) Perform preventive maintenance as required by the instruction manual. (c)...

  18. 40 CFR Appendix B to Subpart S of... - Test Procedures

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Test Procedures B Appendix B to Subpart... Requirements Pt. 51, Subpt. S, App. B Appendix B to Subpart S of Part 51—Test Procedures (I) Idle test (a... begin 10 seconds after the applicable test mode begins. Exhaust gas concentrations shall be analyzed...

  19. 47 CFR 11.61 - Tests of EAS procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Tests of EAS procedures. 11.61 Section 11.61 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL EMERGENCY ALERT SYSTEM (EAS) Tests § 11.61 Tests of EAS procedures. (a) EAS Participants shall conduct tests at regular intervals, as specified in paragraphs (a)(1) and (a)(2) of this...

  20. 47 CFR 11.61 - Tests of EAS procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Tests of EAS procedures. 11.61 Section 11.61 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL EMERGENCY ALERT SYSTEM (EAS) Tests § 11.61 Tests of EAS procedures. (a) EAS Participants shall conduct tests at regular intervals, as specified in paragraphs (a)(1) and (a)(2) of this...

  1. 47 CFR 11.61 - Tests of EAS procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Tests of EAS procedures. 11.61 Section 11.61 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL EMERGENCY ALERT SYSTEM (EAS) Tests § 11.61 Tests of EAS procedures. (a) EAS Participants shall conduct tests at regular intervals, as specified in paragraphs (a)(1) and (a)(2) of this...

  2. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The head assembly is assembled and tested as specified in 49 CFR 572.122 (Subpart N). ... 49 Transportation 7 2010-10-01 2010-10-01 false Head assembly and test procedure. 572.162...

  3. 49 CFR 572.163 - Neck assembly and test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.163 Neck assembly and test procedure. The neck assembly is assembled and tested as specified in 49 CFR 572.123 (Subpart N). ... 49 Transportation 7 2010-10-01 2010-10-01 false Neck assembly and test procedure. 572.163...

  4. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The head assembly is assembled and tested as specified in 49 CFR 572.122 (Subpart N). ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly and test procedure. 572.162...

  5. 49 CFR 572.142 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.142 Section...-year-Old Child Crash Test Dummy, Alpha Version § 572.142 Head assembly and test procedure. (a) The head assembly (refer to § 572.140(a)(1)(i)) for this test consists of the head (drawing 210-1000), adapter...

  6. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The head assembly is assembled and tested as specified in 49 CFR 572.122 (Subpart N). ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.162...

  7. 49 CFR 572.142 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.142 Section...-year-Old Child Crash Test Dummy, Alpha Version § 572.142 Head assembly and test procedure. (a) The head assembly (refer to § 572.140(a)(1)(i)) for this test consists of the head (drawing 210-1000), adapter...

  8. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The head assembly is assembled and tested as specified in 49 CFR 572.122 (Subpart N). ... 49 Transportation 7 2011-10-01 2011-10-01 false Head assembly and test procedure. 572.162...

  9. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The head assembly is assembled and tested as specified in 49 CFR 572.122 (Subpart N). ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.162...

  10. 40 CFR 86.334-79 - Test procedure overview.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... cycle and 1 hot cycle. The Diesel engine test consists of 3 idle modes and 5 power modes at each of 2... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.334-79 Test procedure overview. (a) The test consists of prescribed sequences of engine operating...

  11. 40 CFR 86.334-79 - Test procedure overview.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... cycle and 1 hot cycle. The Diesel engine test consists of 3 idle modes and 5 power modes at each of 2... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.334-79 Test procedure overview. (a) The test consists of prescribed sequences of engine operating...

  12. 40 CFR 86.334-79 - Test procedure overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... cycle and 1 hot cycle. The Diesel engine test consists of 3 idle modes and 5 power modes at each of 2... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.334-79 Test procedure overview. (a) The test consists of prescribed sequences of engine operating...

  13. 40 CFR Appendix B to Subpart S of... - Test Procedures

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Test Procedures B Appendix B to Subpart... Requirements Pt. 51, Subpt. S, App. B Appendix B to Subpart S of Part 51—Test Procedures (I) Idle test (a... begin 10 seconds after the applicable test mode begins. Exhaust gas concentrations shall be analyzed...

  14. 40 CFR 91.411 - Post-test analyzer procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Post-test analyzer procedures. 91.411... Post-test analyzer procedures. (a) Perform a hang-up check within 60 seconds of the completion of the... and record the post-test data specified in § 91.405(e). (e) For a valid test, the analyzer...

  15. 46 CFR 164.007-4 - Testing procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Testing procedure. 164.007-4 Section 164.007-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL MATERIALS Structural Insulations § 164.007-4 Testing procedure. (a) Tests. All tests, including the retests, shall...

  16. Community acceptability of use of rapid diagnostic tests for malaria by community health workers in Uganda

    PubMed Central

    2010-01-01

    Background Many malarious countries plan to introduce artemisinin combination therapy (ACT) at community level using community health workers (CHWs) for treatment of uncomplicated malaria. Use of ACT with reliance on presumptive diagnosis may lead to excessive use, increased costs and rise of drug resistance. Use of rapid diagnostic tests (RDTs) could address these challenges but only if the communities will accept their use by CHWs. This study assessed community acceptability of the use of RDTs by Ugandan CHWs, locally referred to as community medicine distributors (CMDs). Methods The study was conducted in Iganga district using 10 focus group discussions (FGDs) with CMDs and caregivers of children under five years, and 10 key informant interviews (KIIs) with health workers and community leaders. Pre-designed FGD and KII guides were used to collect data. Manifest content analysis was used to explore issues of trust and confidence in CMDs, stigma associated with drawing blood from children, community willingness for CMDs to use RDTs, and challenges anticipated to be faced by the CMDs. Results CMDs are trusted by their communities because of their commitment to voluntary service, access, and the perceived effectiveness of anti-malarial drugs they provide. Some community members expressed fear that the blood collected could be used for HIV testing, the procedure could infect children with HIV, and the blood samples could be used for witchcraft. Education level of CMDs is important in their acceptability by the community, who welcome the use of RDTs given that the CMDs are trained and supported. Anticipated challenges for CMDs included transport for patient follow-up and picking supplies, adults demanding to be tested, and caregivers insisting their children be treated instead of being referred. Conclusion Use of RDTs by CMDs is likely to be acceptable by community members given that CMDs are properly trained, and receive regular technical supervision and logistical

  17. School age test or procedure preparation

    MedlinePlus

    ... type of communication. Older children may benefit from films that show children of the same age explaining, ... procedure. Ask your health care provider if such films are available for your child to watch. Drawing ...

  18. Resolve! Version 2.5: Flammable Gas Accident Analysis Tool Acceptance Test Plan and Test Results

    SciTech Connect

    LAVENDER, J.C.

    2000-10-17

    RESOLVE! Version 2 .5 is designed to quantify the risk and uncertainty of combustion accidents in double-shell tanks (DSTs) and single-shell tanks (SSTs). The purpose of the acceptance testing is to ensure that all of the options and features of the computer code run; to verify that the calculated results are consistent with each other; and to evaluate the effects of the changes to the parameter values on the frequency and consequence trends associated with flammable gas deflagrations or detonations.

  19. CSI computer system/remote interface unit acceptance test results

    NASA Technical Reports Server (NTRS)

    Sparks, Dean W., Jr.

    1992-01-01

    The validation tests conducted on the Control/Structures Interaction (CSI) Computer System (CCS)/Remote Interface Unit (RIU) is discussed. The CCS/RIU consists of a commercially available, Langley Research Center (LaRC) programmed, space flight qualified computer and a flight data acquisition and filtering computer, developed at LaRC. The tests were performed in the Space Structures Research Laboratory (SSRL) and included open loop excitation, closed loop control, safing, RIU digital filtering, and RIU stand alone testing with the CSI Evolutionary Model (CEM) Phase-0 testbed. The test results indicated that the CCS/RIU system is comparable to ground based systems in performing real-time control-structure experiments.

  20. Redstone Test Stand Accepted Into National Register of Historical Places

    NASA Technical Reports Server (NTRS)

    1976-01-01

    On October 02, 1976, Marshall Space Flight Center's (MSFC) Redstone test stand was received into the National Registry of Historical Places. Photographed in front of the Redstone test stand along with their wives are (left to right), Madison County Commission Chairman James Record, Dr. William R. Lucas, MSFC Center Director from June 15, 1974 until July 3, 1986, (holding certificate), Ed, Buckbee, Space and Rocket Center Director; Harvie Jones, Huntsville Architect; Dick Smith; and Joe Jones.

  1. 40 CFR 86.342-79 - Post-test procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... greater, within: (i) 50 seconds for gasoline-fueled engine test, or (ii) 4 minutes for Diesel engine tests... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures §...

  2. 40 CFR 86.342-79 - Post-test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... greater, within: (i) 50 seconds for gasoline-fueled engine test, or (ii) 4 minutes for Diesel engine tests... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures §...

  3. 75 FR 37310 - Engine-Testing Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... the entries for ``Hydrocarbon composition'' to read as follows: Sec. 1065.710 Gasoline... Units General testing testing \\1\\ * * * * * Hydrocarbon composition: Olefins m\\3\\/m\\3\\....... Maximum,...

  4. 40 CFR 86.1111-87 - Test procedures for PCA testing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Light-Duty Trucks § 86.1111-87 Test procedures for PCA testing. (a)(1) For heavy-duty engines, the... in subpart M of this part. (3) For light-duty trucks, the prescribed test procedure for PCA testing...) When testing light-duty trucks, the following exceptions to the test procedures in subpart B...

  5. 40 CFR 86.1111-87 - Test procedures for PCA testing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Light-Duty Trucks § 86.1111-87 Test procedures for PCA testing. (a)(1) For heavy-duty engines, the... in subpart M of this part. (3) For light-duty trucks, the prescribed test procedure for PCA testing...) When testing light-duty trucks, the following exceptions to the test procedures in subpart B...

  6. 40 CFR 86.1111-87 - Test procedures for PCA testing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Light-Duty Trucks § 86.1111-87 Test procedures for PCA testing. (a)(1) For heavy-duty engines, the... in subpart M of this part. (3) For light-duty trucks, the prescribed test procedure for PCA testing...) When testing light-duty trucks, the following exceptions to the test procedures in subpart B...

  7. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... The licensee shall test the operability of the fire extinguishing system. (i) Source return. For...) Water handling system. For pool irradiators, the licensee shall verify that the water purification system, the conductivity meter, and the water level indicators operate properly. (e) Radiation...

  8. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... The licensee shall test the operability of the fire extinguishing system. (i) Source return. For...) Water handling system. For pool irradiators, the licensee shall verify that the water purification system, the conductivity meter, and the water level indicators operate properly. (e) Radiation...

  9. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... it functions as designed and that all alarms, controls, and interlocks work properly. (h) Fire protection. For panoramic irradiators, the licensee shall test the ability of the heat and smoke detectors to detect a fire, to activate alarms, and to cause the source rack to automatically become fully...

  10. 10 CFR 36.41 - Construction monitoring and acceptance testing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... it functions as designed and that all alarms, controls, and interlocks work properly. (h) Fire protection. For panoramic irradiators, the licensee shall test the ability of the heat and smoke detectors to detect a fire, to activate alarms, and to cause the source rack to automatically become fully...

  11. KSC 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT) Report

    NASA Technical Reports Server (NTRS)

    Barbre, Robert E.

    2015-01-01

    This report documents analysis results of the Kennedy Space Center updated 50-MHz Doppler Radar Wind Profiler (DRWP) Operational Acceptance Test (OAT). This test was designed to demonstrate that the new DRWP operates in a similar manner to the previous DRWP for use as a situational awareness asset for mission operations at the Eastern Range to identify rapid changes in the wind environment that weather balloons cannot depict. Data examination and two analyses showed that the updated DRWP meets the specifications in the OAT test plan and performs at least as well as the previous DRWP. Data examination verified that the DRWP provides complete profiles every five minutes from 1.8-19.5 km in vertical increments of 150 m. Analysis of 5,426 wind component reports from 49 concurrent DRWP and balloon profiles presented root mean square (RMS) wind component differences around 2.0 m/s. The DRWP's effective vertical resolution (EVR) was found to be 300 m for both the westerly and southerly wind component, which the best EVR possible given the DRWP's vertical sampling interval. A third analysis quantified the sensitivity to rejecting data that do not have adequate signal by assessing the number of first-guess propagations at each altitude. This report documents the data, quality control procedures, methodology, and results of each analysis. It also shows that analysis of the updated DRWP produced results that were at least as good as the previous DRWP with proper rationale. The report recommends acceptance of the updated DRWP for situational awareness usage as per the OAT's intent.

  12. Evaluation of test procedures for hydrogen environment embrittlement

    NASA Technical Reports Server (NTRS)

    Nelson, H. G.

    1974-01-01

    Report presents discussion of three common and primary influences on embrittlement process. Application of theoretical considerations to design of test coupons and methods is illustrated for both internal and external hydrogen embrittlement. Acceptable designs and methods are indicated.

  13. Acceptance test report for the Tank 241-C-106 in-tank imaging system

    SciTech Connect

    Pedersen, L.T.

    1998-05-22

    This document presents the results of Acceptance Testing of the 241-C-106 in-tank video camera imaging system. The purpose of this imaging system is to monitor the Project W-320 sluicing of Tank 241-C-106. The objective of acceptance testing of the 241-C-106 video camera system was to verify that all equipment and components function in accordance with procurement specification requirements and original equipment manufacturer`s (OEM) specifications. This document reports the results of the testing.

  14. 40 CFR 60.266 - Test methods and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Test methods and procedures. 60.266 Section 60.266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Production Facilities § 60.266 Test methods and procedures. (a) During any performance test required in §...

  15. 40 CFR 60.266 - Test methods and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Test methods and procedures. 60.266 Section 60.266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Production Facilities § 60.266 Test methods and procedures. (a) During any performance test required in §...

  16. 40 CFR 60.266 - Test methods and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Test methods and procedures. 60.266 Section 60.266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Production Facilities § 60.266 Test methods and procedures. (a) During any performance test required in §...

  17. 40 CFR 60.266 - Test methods and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Test methods and procedures. 60.266 Section 60.266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Production Facilities § 60.266 Test methods and procedures. (a) During any performance test required in §...

  18. 40 CFR 60.266 - Test methods and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Test methods and procedures. 60.266 Section 60.266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Production Facilities § 60.266 Test methods and procedures. (a) During any performance test required in §...

  19. 40 CFR 455.50 - Identification of test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Identification of test procedures. 455.50 Section 455.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS PESTICIDE CHEMICALS Test Methods for Pesticide Pollutants § 455.50 Identification of test procedures. The pesticide...

  20. 49 CFR 572.74 - Thorax assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (c) of this section, the peak resultant accelerations at the accelerometers mounted in the chest... acceleration-time curve for this test shall be unimodal at or above the 30g level, and shall lie at or above... lateral accelerations shall not exceed 5g. (c) Thorax test procedure. The test procedure for the thorax...