Science.gov

Sample records for accounting control system

  1. Control Systems in Accounting; Business Education: 7709.21.

    ERIC Educational Resources Information Center

    McGahee, Bobby; Carino, Mariano

    The course prepares the business education student to maintain voucher systems, inventory and budgetary controls, including notes, drafts, and business taxes. The student should have attained the objectives of Partnership Accounting prior to enrollment. Course content includes equipment and supplies, the voucher system, inventory control systems,…

  2. U.S. national nuclear material control and accounting system

    SciTech Connect

    Taylor, S; Terentiev, V G

    1998-12-01

    Issues related to nuclear material control and accounting and illegal dealing in these materials were discussed at the April 19--20, 1996 Moscow summit meeting (G7 + Russia). The declaration from this meeting reaffirmed that governments are responsible for the safety of all nuclear materials in their possession and for the effectiveness of the national control and accounting system for these materials. The Russian delegation at this meeting stated that ''the creation of a nuclear materials accounting, control, and physical protection system has become a government priority''. Therefore, in order to create a government nuclear material control and accounting system for the Russian Federation, it is critical to study the structure, operating principles, and regulations supporting the control and accounting of nuclear materials in the national systems of nuclear powers. In particular, Russian specialists have a definite interest in learning about the National Nuclear Material Control and Accounting System of the US, which has been operating successfully as an automated system since 1968.

  3. Systems Analysis for Material Control and Accountancy Technology (SAMCAT)

    SciTech Connect

    Persiani, P.J., Bucher, R.G.; Rothman, A.B.; Cha, B.K.

    1990-01-01

    The Systems Analysis for Material Control and Accountancy Technology (SAMCAT) is an interactive computer-based management system developed for the Department of Energy Office of Safeguards and Security, to assist in defining and prioritizing measurement upgrades programs for Material Control and Accountancy (MC A). The accountancy upgrades options evaluated by SAMCAT in this study are: (1) improvement of the uncertainties in the SNM measurement methods, (2) reduction of throughputs and/or inventories of SNM, and (3) reduction of the material balance accounting period. The goals of the MC A upgrades program are reduced inventory differences and associated uncertainties, improved detection probabilities for theft/diversion, decreased operating costs, and enhanced material traceability. 6 refs., 3 figs., 2 tabs.

  4. Prescriptive concepts for advanced nuclear materials control and accountability systems

    SciTech Connect

    Whitty, W.J.; Strittmatter, R.B.; Ford, W.; Tisinger, R.M.; Meyer, T.H.

    1987-06-01

    Networking- and distributed-processing hardware and software have the potential of greatly enhancing nuclear materials control and accountability (MC and A) systems, from both safeguards and process operations perspectives, while allowing timely integrated safeguards activities and enhanced computer security at reasonable cost. A hierarchical distributed system is proposed consisting of groups of terminal and instruments in plant production and support areas connected to microprocessors that are connected to either larger microprocessors or minicomputers. These micros and/or minis are connected to a main machine, which might be either a mainframe or a super minicomputer. Data acquisition, preliminary input data validation, and transaction processing occur at the lowest level. Transaction buffering, resource sharing, and selected data processing occur at the intermediate level. The host computer maintains overall control of the data base and provides routine safeguards and security reporting and special safeguards analyses. The research described outlines the distribution of MC and A system requirements in the hierarchical system and distributed processing applied to MC and A. Implications of integrated safeguards and computer security concepts for the distributed system design are discussed. 10 refs., 4 figs.

  5. Nuclear Material Control and Accountability System Effectiveness Tool (MSET)

    SciTech Connect

    Powell, Danny H; Elwood Jr, Robert H; Roche, Charles T; Campbell, Billy J; Hammond, Glenn A; Meppen, Bruce W; Brown, Richard F

    2011-01-01

    A nuclear material control and accountability (MC&A) system effectiveness tool (MSET) has been developed in the United States for use in evaluating material protection, control, and accountability (MPC&A) systems in nuclear facilities. The project was commissioned by the National Nuclear Security Administration's Office of International Material Protection and Cooperation. MSET was developed by personnel with experience spanning more than six decades in both the U.S. and international nuclear programs and with experience in probabilistic risk assessment (PRA) in the nuclear power industry. MSET offers significant potential benefits for improving nuclear safeguards and security in any nation with a nuclear program. MSET provides a design basis for developing an MC&A system at a nuclear facility that functions to protect against insider theft or diversion of nuclear materials. MSET analyzes the system and identifies several risk importance factors that show where sustainability is essential for optimal performance and where performance degradation has the greatest impact on total system risk. MSET contains five major components: (1) A functional model that shows how to design, build, implement, and operate a robust nuclear MC&A system (2) A fault tree of the operating MC&A system that adapts PRA methodology to analyze system effectiveness and give a relative risk of failure assessment of the system (3) A questionnaire used to document the facility's current MPC&A system (provides data to evaluate the quality of the system and the level of performance of each basic task performed throughout the material balance area [MBA]) (4) A formal process of applying expert judgment to convert the facility questionnaire data into numeric values representing the performance level of each basic event for use in the fault tree risk assessment calculations (5) PRA software that performs the fault tree risk assessment calculations and produces risk importance factor reports on the

  6. Criteria for Determination of Material Control and Accountability System Effectiveness

    SciTech Connect

    John Wright

    2008-03-01

    The Nevada Test Site (NTS) is a test bed for implementation of the Safeguards First Principles Initiative (SFPI), a risk-based approach to Material Control & Accountability (MC&A) requirements. The Comprehensive Assessment of Safeguards Strategies (COMPASS) model is used to determine the effectiveness of MC&A systems under SFPI. Under this model, MC&A is divided into nine primary elements. Each element is divided into sub-elements. Then each sub-element is assigned two values, effectiveness and contribution, that are used to calculate the rating. Effectiveness is a measure of subelement implementation and how well it meets requirements. Contribution is a relative measure of the importance, and functions as a weighting factor. The COMPASS model provides the methodology for calculation of sub-element and element ratings, but not the actual criteria. Each site must develop its own criteria. For the rating to be meaningful, the effectiveness criteria must be objective and based on explicit, measurable criteria. Contribution (weights) must reflect the importance within the MC&A program. This paper details the NTS approach to system effectiveness and contribution values, and will cover the following: the basis for the ratings, an explanation of the contribution “weights,” and the objective, performance based effectiveness criteria. Finally, the evaluation process will be described.

  7. MATERIAL CONTROL ACCOUNTING INMM

    SciTech Connect

    Hasty, T.

    2009-06-14

    Since 1996, the Mining and Chemical Combine (MCC - formerly known as K-26), and the United States Department of Energy (DOE) have been cooperating under the cooperative Nuclear Material Protection, Control and Accounting (MPC&A) Program between the Russian Federation and the U.S. Governments. Since MCC continues to operate a reactor for steam and electricity production for the site and city of Zheleznogorsk which results in production of the weapons grade plutonium, one of the goals of the MPC&A program is to support implementation of an expanded comprehensive nuclear material control and accounting (MC&A) program. To date MCC has completed upgrades identified in the initial gap analysis and documented in the site MC&A Plan and is implementing additional upgrades identified during an update to the gap analysis. The scope of these upgrades includes implementation of MCC organization structure relating to MC&A, establishing material balance area structure for special nuclear materials (SNM) storage and bulk processing areas, and material control functions including SNM portal monitors at target locations. Material accounting function upgrades include enhancements in the conduct of physical inventories, limit of error inventory difference procedure enhancements, implementation of basic computerized accounting system for four SNM storage areas, implementation of measurement equipment for improved accountability reporting, and both new and revised site-level MC&A procedures. This paper will discuss the implementation of MC&A upgrades at MCC based on the requirements established in the comprehensive MC&A plan developed by the Mining and Chemical Combine as part of the MPC&A Program.

  8. CYBERSECURITY AND USER ACCOUNTABILITY IN THE C-AD CONTROL SYSTEM

    SciTech Connect

    MORRIS,J.T.; BINELLO, S.; D OTTAVIO, T.; KATZ, R.A.

    2007-10-15

    A heightened awareness of cybersecurity has led to a review of the procedures that ensure user accountability for actions performed on the computers of the Collider-Accelerator Department (C-AD) Control System. Control system consoles are shared by multiple users in control rooms throughout the C-AD complex. A significant challenge has been the establishment of procedures that securely control and monitor access to these shared consoles without impeding accelerator operations. This paper provides an overview of C-AD cybersecurity strategies with an emphasis on recent enhancements in user authentication and tracking methods.

  9. Accounting for Teamwork: A Critical Study of Group-Based Systems of Organizational Control.

    ERIC Educational Resources Information Center

    Ezzamel, Mahmoud; Willmott, Hugh

    1998-01-01

    Examines the role of accounting calculations in reorganizing manufacturing capabilities of a vertically integrated global retailing company. Introducing teamwork to replace line work extended traditional, hierarchical management control systems. Teamwork's self-managing demands contravened workers' established sense of self-identity as…

  10. Framework for the systematic assessment of a material control and accounting system

    SciTech Connect

    Schechter, R.S.; Sacks, I.J.

    1981-04-22

    Procedures are described for the systematic assessment of a Material Control and Accounting (MC and A) system, in terms of compliance to the proposed MC and A Upgrade Rule. The applicability of these assessment procedures to specific Rule provisions is discussed. Special attention is given to the statistical performance of individual subsystems, and their vulnerability to compromise by insider collusion.

  11. 77 FR 28407 - Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... January 1998 (63 FR 2426; January 15, 1998), because the underlying basis standard, ANSI N15.8-1974... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants AGENCY:...

  12. 78 FR 38739 - Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-27

    ... Information DG-5028, was published in the Federal Register on May 14, 2012 (77 FR 28407), for a 60-day public... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants AGENCY:...

  13. Upgrade of the Nuclear Material Protection, Control and Accounting System at the VNIIEF Industrial Zone

    SciTech Connect

    Lewis, J.C.; Maltsev, V.; Singh, S.P.

    1999-09-20

    The Industrial Zone at the Russian Federal Nuclear Center/All-Russian Scientific Research Institute of Experimental Physics (RFNC/VNEEF) consists of ten guarded areas with twenty two material balance areas (A and As). The type of facilities in the Industrial Zone include storage sites, machine shops, research facilities, and training facilities. Modernization of the Material Protection, Control and Accounting (MPC and A) System at the Industrial Zone started in 1997. This paper provides a description of, the methodology/strategy used in the upgrade of the MFC and A system.

  14. NuMas: A LAN-based materials control and accounting system in production

    SciTech Connect

    Strickland, T.W.; Bracey, J.T.; McMahon, S.A.

    1995-12-31

    A state-of-the-art Nuclear Materials Control and Accounting (NMC and A) System has been implemented and is fully operational at the Paducah Gaseous Diffusion Plant (PGDP) as of September 1994. The uranium enrichment facility is currently regulated by the Department of Energy (DOE) and is in the process of obtaining Nuclear Regulatory Commission (NRC) certification. Implementation of this system has resulted in a tremendous cost savings to the facility as well as improvements to the overall efficiency of the NMC and A department. This paper outlines the benefits of implementing a Personal Computer/Local Area Network (PC/LAN)-based system in hopes of attracting other facilities to explore and utilize its application at their sites.

  15. Advanced international training course on state systems of accounting for and control of nuclear materials

    SciTech Connect

    Not Available

    1981-10-01

    This report incorporates all lectures and presentations at the Advanced International Training Course on State Systems of Accounting for and Control of Nuclear Material held April 27 through May 12, 1981 at Santa Fe and Los Alamos, New Mexico, and Richland, Washington, USA. Authorized by the US Nuclear Non-Proliferation Act and sponsored by the US Department of Energy in cooperation with the International Atomic Energy Agency, the course was developed to provide practical training in the design, implementation, and operation of a state system of nuclear materials accountability and control that satisfies both national and international safeguards. Major emphasis for the 1981 course was placed on safeguards methods used at bulk-handling facilities, particularly low-enriched uranium conversion and fuel fabrication plants. The course was conducted by the University of California's Los Alamos National Laboratory, the Battelle Pacific Northwest Laboratory, and Exxon Nuclear Company, Inc. Tours and demonstrations were arranged at both the Los Alamos National Laboratory, Los Alamos, New Mexico, and the Exxon Nuclear fuel fabrication plant, Richland, Washington.

  16. Human Resource Accounting System

    ERIC Educational Resources Information Center

    Cerullo, Michael J.

    1974-01-01

    Main objectives of human resource accounting systems are to satisfy the informational demands made by investors and by operating managers. The paper's main concern is with the internal uses of a human asset system. (Author)

  17. 25 CFR 543.14 - What are the minimum internal control standards for patron deposit accounts and cashless systems?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 2 2014-04-01 2014-04-01 false What are the minimum internal control standards for patron deposit accounts and cashless systems? 543.14 Section 543.14 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN SERVICES MINIMUM INTERNAL CONTROL STANDARDS FOR CLASS II GAMING § 543.14 What are the minimum internal...

  18. 25 CFR 543.14 - What are the minimum internal control standards for patron deposit accounts and cashless systems?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false What are the minimum internal control standards for patron deposit accounts and cashless systems? 543.14 Section 543.14 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN SERVICES MINIMUM INTERNAL CONTROL STANDARDS FOR CLASS II...

  19. Development of computerized materials, protection, control and accountability systems in the former Soviet republics: a joint effort

    SciTech Connect

    Whiteson, R.; Ryan, R.H.; Seitz, S.; Landry, R.P.

    1996-07-01

    The laboratory-to-laboratory programs of cooperation between the US Department of Energy (DOE) and the Institutes of the Russian Federation and the government-to-government programs between the US and Russia have the goal of reducing the danger of nuclear weapons proliferation by strengthening systems of nuclear materials protection, control, and accountability (MPC&A). As part of these programs, DOE is making available to sites in the former Soviet Republics a new-generation nuclear materials accountability system similar to one developed for DOE sites. This new system, the Core Materials Accountability System (COREMAS), is designed for international use. It is a core system to which facility-specific extensions are expected to be made. This paper describes the joint efforts of US personnel and software development teams at sites in Russia, Kazakhstan, and the Ukraine to develop sophisticated computerized MPC&A systems that are customized for the site-specific needs of each facility.

  20. NNSA's next generation safeguards initiative to define an effective state system of accounting and control

    SciTech Connect

    Stevens, Rebecca S; Sunshine, Alexander; Matthews, Caroline; Frazer, Sarah; Matthews, Carrie

    2010-01-01

    The International Nuclear Safeguards and Engagement Program (INSEP), the international outreach component of the Next Generation Safeguards Initiative (NGSI), is a collaborative program that endeavors to strengthen international safeguards at all stages of nuclear development. One of the critical ways the program achieves this objective is through working with partners to increase the effectiveness of the State System of Accountancy for and Control of Nuclear Materials (SSAC) - the essential elements of national, regulatory and facility safeguards competencies that work as a system to provide the International Atomic Energy Agency (IAEA) and the world the full assurance of the state's adherence to its safeguards agreements. INSEP provides assistance in developing a state's SSAC in a number of areas, from developing national legislation governing the possession and use of nuclear material to working with nuclear facility operators to developing good practices in waste management. INSEP has collaborated with foreign partners in peaceful nuclear applications for over two decades, but recently, it has focused its efforts on strengthening SSACs due to the growth of nuclear power worldwide, particularly in countries with limited nuclear infrastructures. This new area of focus has prompted INSEP to develop a model of SSAC competencies that will serve not only as a structure for its engagement with partner states, but also as a means to facilitate coordination with other states that provide training and assistance, and as a mechanism for evaluating the effectiveness of its work in reaching its intended objectives. While this model uses as its starting point the requirements on a State that are presented in the Comprehensive Safeguards Agreement and the Additional Protocol, it is not, in itself, a requirements document or guidance for implementing requirements. It is rather an analysis of what capabilities will be needed in a State to be able to meet requirements and to

  1. MASS: An automated accountability system

    SciTech Connect

    Erkkila, B.H.; Kelso, F.

    1994-08-01

    All Department of Energy contractors who manage accountable quantities of nuclear materials are required to implement an accountability system that tracks, and records the activities associated with those materials. At Los Alamos, the automated accountability system allows data entry on computer terminals and data base updating as soon as the entry is made. It is also able to generate all required reports in a timely Fashion. Over the last several years, the hardware and software have been upgraded to provide the users with all the capability needed to manage a large variety of operations with a wide variety of nuclear materials. Enhancements to the system are implemented as the needs of the users are identified. The system has grown with the expanded needs of the user; and has survived several years of changing operations and activity. The user community served by this system includes processing, materials control and accountability, and nuclear material management personnel. In addition to serving the local users, the accountability system supports the national data base (NMMSS). This paper contains a discussion of several details of the system design and operation. After several years of successful operation, this system provides an operating example of how computer systems can be used to manage a very dynamic data management problem.

  2. Automated attendance accounting system

    NASA Technical Reports Server (NTRS)

    Chapman, C. P. (Inventor)

    1973-01-01

    An automated accounting system useful for applying data to a computer from any or all of a multiplicity of data terminals is disclosed. The system essentially includes a preselected number of data terminals which are each adapted to convert data words of decimal form to another form, i.e., binary, usable with the computer. Each data terminal may take the form of a keyboard unit having a number of depressable buttons or switches corresponding to selected data digits and/or function digits. A bank of data buffers, one of which is associated with each data terminal, is provided as a temporary storage. Data from the terminals is applied to the data buffers on a digit by digit basis for transfer via a multiplexer to the computer.

  3. Minatom of Russia Situation and Crisis Center and the Automated Federal Information System for Nuclear Material Control and Accounting

    SciTech Connect

    Berchik,V P; Kasumova,L A; Babcock,R A; Heinberg,C L; Tynan,D M

    2001-06-25

    Under the Situation and Crisis Center (SCC) management, the Information Analytical Center (IAC) of the Ministry of Atomic Energy (Minatom) of Russia was created to oversee the operation of the Federal Nuclear Material Control and Accounting Information System (FIS). During 2000, the FIS achieved an important milestone in its development: the basic functions of the information system were implemented. This includes placing into operation the collecting and processing of nuclear material control and accounting (MC&A) information from the enterprises reporting to the FIS. The FIS began working with 14 Russian enterprises to develop and implement full-function reporting (i.e., reporting inventory and inventory changes including closeout and reconciliation between the FIS and enterprises). In 2001, the system will expand to include enterprise-level inventory information for all enterprises using nuclear materials in Russia. For this reason, at the end of 2000 through the beginning of 2001, five separate training sessions were held for over 100 enterprise personnel responsible for preparation and transfer of the reports to the FIS. Through the assistance of the Nuclear Material Protection, Control and Accounting (MPC&A) program, information systems for the accounting of nuclear materials are being installed at Russia enterprises. In creating the program for modernization of the Russian Federation State System of Accounting and Control (SSAC) of nuclear material, the SCC conducted a survey of the enterprises to determine the readiness of their internal MC&A systems for reporting to the FIS. Based on the information from the survey and the results of the projects on creation of local information systems at Russian enterprises, the analysis of information and the technical aspects of MC&A systems identified deficiencies that were analyzed and recommendations for eliminating these deficiencies were proposed. The concentration of analytical and administrative functions at the

  4. Material control and accountability alternatives

    SciTech Connect

    1991-08-12

    Department of Energy and Nuclear Regulatory Commission regulations governing material control and accountability in nuclear facilities have become more restrictive in the past decade, especially in areas that address the insider threat. As the insider threat receives greater credibility, regulations have been strengthened to increase the probability of detecting insider activity and to prevent removal of a significant quantity of Special Nuclear Material (SNM) from areas under control of the protective force.

  5. International training course on implementation of state systems of accounting for and control of nuclear materials: proceedings

    SciTech Connect

    Not Available

    1986-06-01

    This report incorporates all lectures and presentations at the International Training Course on Implementation of State Systems of Accounting for and Control of Nuclear Materials held June 3 through June 21, 1985, at Santa Fe and Los Alamos, New Mexico, and San Clemente, California. Authorized by the US Nuclear Non-Proliferation Act and sponsored by the US Department of Energy in cooperation with the International Atomic Energy Agency, the Course was developed to provide practical training in the design, implementation, and operation of a state system of nuclear materials accountability and control that satisfies both national and international safeguards requirements. Major emphasis for the 1985 course was placed on safeguards methods used at item-control facilities, particularly nuclear power generating stations and test reactors. An introduction to safeguards methods used at bulk handling facilities, particularly low-enriched uranium conversion and fuel fabrication plants, was also included. The course was conducted by the University of California's Los Alamos National Laboratory and the Southern California Edison Company. Tours and demonstrations were arranged at the Los Alamos National Laboratory, Los Alamos, New Mexico, and the San Onofre Nuclear Generating Station, San Clemente, California.

  6. Accounting Systems for School Districts.

    ERIC Educational Resources Information Center

    Atwood, E. Barrett, Jr.

    1983-01-01

    Advises careful analysis and improvement of existing school district accounting systems prior to investment in new ones. Emphasizes the importance of attracting and maintaining quality financial staffs, developing an accounting policies and procedures manual, and designing a good core accounting system before purchasing computer hardware and…

  7. International training course on implementation of state systems of accounting for and control of nuclear materials: proceedings

    SciTech Connect

    Not Available

    1984-06-01

    This report incorporates all lectures and presentations at the International Training Course on Implementation of State Systems of Accounting for and Control of Nuclear Materials held October 17 through November 4, 1983, at Santa Fe and Los Alamos, New Mexico and Richland, Washington, USA. Authorized by the US Nuclear Non-Proliferation Act and sponsored by the US Department of Energy in cooperation with the International Atomic Energy Agency, the course was developed to provide practical training in the design, implementation, and operation of a State system of nuclear materials accountability and control that satisfies both national and international safeguards requirements. Major emphasis for the 1983 course was placed on safeguards methods used at bulk-handling facilities, particularly low-enriched uranium conversion and fuel fabrication plants. The course was conducted by the University of California's Los Alamos National Laboratory and Exxon Nuclear Company, Inc. Tours and demonstrations were arranged at the Los Alamos National Laboratory, Los Alamos, New Mexico, and the Exxon Nuclear fuel fabrication plant, the Battelle Pacific Northwest Laboratory, Westinghouse Fast Flux Test Facility Visitor Center, and Washington Public Power System nuclear reactor facilities in Richland, Washington. Individual presentations were indexed for inclusion in the Energy Data Base.

  8. An information theory account of cognitive control

    PubMed Central

    Fan, Jin

    2014-01-01

    Our ability to efficiently process information and generate appropriate responses depends on the processes collectively called cognitive control. Despite a considerable focus in the literature on the cognitive control of information processing, neural mechanisms underlying control are still unclear, and have not been characterized by considering the quantity of information to be processed. A novel and comprehensive account of cognitive control is proposed using concepts from information theory, which is concerned with communication system analysis and the quantification of information. This account treats the brain as an information-processing entity where cognitive control and its underlying brain networks play a pivotal role in dealing with conditions of uncertainty. This hypothesis and theory article justifies the validity and properties of such an account and relates experimental findings to the frontoparietal network under the framework of information theory. PMID:25228875

  9. An anomaly detector applied to a materials control and accounting system

    SciTech Connect

    Whiteson, R.; Kelso, F.; Baumgart, C.; Tunnell, T.W.

    1994-08-01

    Large amounts of safeguards data are automatically gathered and stored by monitoring instruments used in nuclear chemical processing plants, nuclear material storage facilities, and nuclear fuel fabrication facilities. An integrated safeguards approach requires the ability to identify anomalous activities or states in these data. Anomalies in the data could be indications of error, theft, or diversion of material. The large volume of the data makes analysis and evaluation by human experts very tedious, and the complex and diverse nature of the data makes these tasks difficult to automate. This paper describes the early work in the development of analysis tools to automate the anomaly detection process. Using data from accounting databases, the authors are modeling the normal behavior of processes. From these models they hope to be able to identify activities or data that deviate from that norm. Such tools would be used to reveal trends, identify errors, and recognize unusual data. Thus the expert`s attention can be focused directly on significant phenomena.

  10. New Controls and Accountability for South African Teachers and Schools: The Integrated Quality Management System

    ERIC Educational Resources Information Center

    Weber, Everard

    2005-01-01

    This article analyses the Integrated Quality Management System (IQMS), an agreement reached in 2003 between the South African Education Department and the major teacher organisations in the country by using discourse analysis. The IQMS was scheduled to be implemented in public schools in 2004. Three discursive tensions are identified and…

  11. Accountability Reporting and Tracking System

    1992-07-02

    ARTS is a micro based prototype of the data elements, screens, and information processing rules that apply to the Accountability Reporting Program. The system focuses on the Accountability Event. The Accountability Event is an occurrence of incurring avoidable costs. The system must be able to CRUD (Create, Retrieve, Update, Delete) instances of the Accountability Event. Additionally, the system must provide for a review committee to update the ''event record'' with findings and determination information. Lastly,more » the system must provide for financial representatives to perform a cost reporting process.« less

  12. The Ural Electrochemical Integrated Plant Sustainability Program of Nuclear Material Protection, Control and Accounting System Upgrades

    SciTech Connect

    Vakhonin, Alexander; Yuldashev, Rashid; Dabbs, Richard D.; Carroll, Michael F.; Garrett, Albert G.; Patrick, Scott W.; Ku, Eshter M.

    2009-09-30

    UEIP has been working on a comprehensive sustainability program that includes establishing a site sustainability working group, information gathering, planning, organizing, developing schedule and estimated costs, trhough joint UEIP-US DOE/NNSA National Laboratory sustainability contracts. Considerable efforts have been necessary in the sustainability planning, monitoring, and control of the scope of work using tools such as Microsoft Excel, Microsoft Project and SAP R/3. While information interchanges within the sustainability program provides adequate US assurances that US funds are well spent through its quarterly reporting methodology, proper information security and protection measures are taken throughout the process. Decommissioning of outdated equipment has also become part of determining sustainability requirements and processes. The site’s sustainability program has facilitated the development of a transition plan toward eventual full Russian funding of sustaining nuclear security upgrades.

  13. Continuous Efforts to Develop the National System for Material Control and Accounting Training at the George Kuzmycz Training Center

    SciTech Connect

    Gavrilyuk, Victor I.; Kirischuk, Volodymyr; Romanova, Olena; Levina, Elena; Diakov, Oleksii; Drapey, Sergiy; Proskurin, Dmitry; Gavrilyuk-Burakova, Anna

    2011-10-01

    The George Kuzmycz Training Center (GKTC) for Physical Protection, Control and Accounting of Nuclear Materials was established in 1998 at the Kyiv Institute of Nuclear Research of the Ukrainian Academy of Sciences through the collaborative efforts of the United States and Ukraine. Later the European Commission (EC) joined the US in assisting with the Material Control and Accounting (MC&A) part of the GKTC training program. The Government of Ukraine designated the GKTC as the National Center responsible for providing training and methodological support for nuclear facilities and nuclear specialists in the Material Protection, Control and Accounting (MPC&A) area. To increase the efficiency of the State MC&A system an essential number of new regulations, norms and rules have been developed; some of them mandate regular and more intensive training of MC&A specialists in the industry - from those working at the Nuclear Regulatory Authority of Ukraine to the personnel of nuclear facilities. To meet such regulations GKTC plans to develop next year a number of training courses under the EC contract; such courses will reflect both the specifics of Ukrainian nuclear facilities and the level of expertise of the facilities’ personnel. The NDA training laboratory, established in 2003 with US DOE financial support and technical and methodological assistance, considerably expanded the GKTC’s training capabilities for MC&A programs. Next year that lab will be supplemented with a new NM Surveillance and Containment laboratory as current plans call for under the EC contract. The US DOE is also providing funding to support that project. Under the EC contract the laboratory will be equipped with state-of-the-art, advanced surveillance and containment equipment which will strengthen and expand even further the GKTC’s training capabilities and potential. This will allow GKTC to train Ukrainian nuclear industry specialists in practically all MC&A topics. Furthermore, GKTC is

  14. Tritium accountancy in fusion systems

    SciTech Connect

    Klein, J.E.; Clark, E.A.; Harvel, C.D.; Farmer, D.A.; Tovo, L.L.; Poore, A.S.; Moore, M.L.

    2015-03-15

    The US Department of Energy (DOE) has clearly defined requirements for nuclear material control and accountability (MCA) of tritium whereas the International Atomic Energy Agency (IAEA) does not since tritium is not a fissile material. MCA requirements are expected for tritium fusion machines and will be dictated by the host country or regulatory body where the machine is operated. Material Balance Areas (MBA) are defined to aid in the tracking and reporting of nuclear material movements and inventories. Material sub-accounts (MSA) are established along with key measurement points (KMP) to further subdivide a MBA to localize and minimize uncertainties in the inventory difference (ID) calculations for tritium accountancy. Fusion systems try to minimize tritium inventory which may require continuous movement of material through the MSA. The ability of making meaningful measurements of these material transfers is described in terms of establishing the MSA structure to perform and reconcile ID calculations. For fusion machines, changes to the traditional ID equation will be discussed which includes breeding, burn-up, and retention of tritium in the fusion device. The concept of 'net' tritium quantities consumed or lost in fusion devices is described in terms of inventory taking strategies and how it is used to track the accumulation of tritium in components or fusion machines. (authors)

  15. Measurement control administration for nuclear materials accountability

    SciTech Connect

    Rudy, C.R.

    1991-01-31

    In 1986 a measurement control program was instituted at Mound to ensure that measurement performance used for nuclear material accountability was properly monitored and documented. The organization and management of various aspects of the program are discussed. Accurate measurements are the basis of nuclear material accountability. The validity of the accountability values depends on the measurement results that are used to determine inventories, receipts, and shipments. With this measurement information, material balances are calculated to determine losses and gains of materials during a specific time period. Calculation of Inventory Differences (ID) are based on chemical or physical measurements of many items. The validity of each term is dependent on the component measurements. Thus, in Figure 1, the measured element weight of 17 g is dependent on the performance of the particular measurement system that was used. In this case, the measurement is performed using a passive gamma ray method with a calibration curve determined by measuring representative standards containing a range of special nuclear materials (Figure 2). One objective of a measurement control program is to monitor and verify the validity of the calibration curve (Figure 3). In 1986 Mound's Nuclear Materials Accountability (NMA) group instituted a formal measurement control program to ensure the validity of the numbers that comprise this equation and provide a measure of how well bulk materials can be controlled. Most measurements used for accountability are production measurements with their own quality assurance programs. In many cases a measurement control system is planned and maintained by the developers and operators of the particular measurement system with oversight by the management responsible for the results. 4 refs., 7 figs.

  16. TRITIUM ACCOUNTANCY IN FUSION SYSTEMS

    SciTech Connect

    Klein, J. E.; Farmer, D. A.; Moore, M. L.; Tovo, L. L.; Poore, A. S.; Clark, E. A.; Harvel, C. D.

    2014-03-06

    The US Department of Energy (DOE) has clearly defined requirements for nuclear material control and accountability (MC&A) of tritium whereas the International Atomic Energy Agency (IAEA) does not since tritium is not a fissile material. MC&A requirements are expected for tritium fusion machines and will be dictated by the host country or regulatory body where the machine is operated. Material Balance Areas (MBAs) are defined to aid in the tracking and reporting of nuclear material movements and inventories. Material subaccounts (MSAs) are established along with key measurement points (KMPs) to further subdivide a MBA to localize and minimize uncertainties in the inventory difference (ID) calculations for tritium accountancy. Fusion systems try to minimize tritium inventory which may require continuous movement of material through the MSAs. The ability of making meaningful measurements of these material transfers is described in terms of establishing the MSA structure to perform and reconcile ID calculations. For fusion machines, changes to the traditional ID equation will be discussed which includes breading, burn-up, and retention of tritium in the fusion device. The concept of “net” tritium quantities consumed or lost in fusion devices is described in terms of inventory taking strategies and how it is used to track the accumulation of tritium in components or fusion machines.

  17. VALIDATION OF NUCLEAR MATERIAL CONTROL AND ACCOUNTABILITY (MC&A) SYSTEM EFFECTIVENESS TOOL (MSET) AT IDAHO NATIONAL LABORATORY (INL)

    SciTech Connect

    Meppen, Bruce; Haga, Roger; Moedl, Kelley; Bean, Tom; Sanders, Jeff; Thom, Mary Alice

    2008-07-01

    A Nuclear Material Control and Accountability (MC&A) Functional Model has been developed to describe MC&A systems at facilities possessing Category I or II Special Nuclear Material (SNM). Emphasis is on achieving the objectives of 144 “Fundamental Elements” in key areas ranging from categorization of nuclear material to establishment of Material Balance Areas (MBAs), controlling access, performing quality measurements of inventories and transfers, timely reporting all activities, and detecting and investigating anomalies. An MC&A System Effectiveness Tool (MSET), including probabilistic risk assessment (PRA) technology for evaluating MC&A effectiveness and relative risk, has been developed to accompany the Functional Model. The functional model and MSET were introduced at the 48th annual International Nuclear Material Management (INMM) annual meeting in July, 20071,2. A survey/questionnaire is used to accumulate comprehensive data regarding the MC&A elements at a facility. Data is converted from the questionnaire to numerical values using the DELPHI method and exercises are conducted to evaluate the overall effectiveness of an MC&A system. In 2007 a peer review was conducted and a questionnaire was completed for a hypothetical facility and exercises were conducted. In the first quarter of 2008, a questionnaire was completed at Idaho National Laboratory (INL) and MSET exercises were conducted. The experience gained from conducting the MSET exercises at INL helped evaluate the completeness and consistency of the MC&A Functional Model, descriptions of fundamental elements of the MC&A Functional Model, relationship between the MC&A Functional Model and the MC&A PRA tool and usefulness of the MSET questionnaire data collection process.

  18. JSC interactive basic accounting system

    NASA Technical Reports Server (NTRS)

    Spitzer, J. F.

    1978-01-01

    Design concepts for an interactive basic accounting system (IBAS) are considered in terms of selecting the design option which provides the best response at the lowest cost. Modeling the IBAS workload and applying this workload to a U1108 EXEC 8 based system using both a simulation model and the real system is discussed.

  19. 24 CFR 17.69 - Accounting control.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Accounting control. 17.69 Section... § 17.69 Accounting control. Each office and the Department Claims Officer shall process all claims collections through the appropriate accounting office and report the collection, compromise, suspension...

  20. Accountability and Internal Control--Do We Really Need It?

    ERIC Educational Resources Information Center

    Clarke, Allan B.

    1987-01-01

    Briefly looks at some of the basic principles of accountability and internal control as a review of present accounting system procedures to aid administrators to ensure reliable financial records. (MLF)

  1. 24 CFR 17.69 - Accounting control.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Accounting control. 17.69 Section 17.69 Housing and Urban Development Office of the Secretary, Department of Housing and Urban... § 17.69 Accounting control. Each office and the Department Claims Officer shall process all...

  2. Materials control and accounting (MC and A): the evolutionary pressures

    SciTech Connect

    Shipley, J.P.

    1983-01-01

    Nuclear materials control and accounting systems are subject to pressures of both regulatory and institutional natures. This fact, coupled with the emergence of new technology, is causing evolutionary changes in materials control and accounting systems. These changes are the subject of this paper.

  3. Experience gained at the Novovoronezh nuclear power plant with development and introduction of a unified automated system for accounting and control of radioactive substances and radioactive wastes

    NASA Astrophysics Data System (ADS)

    Bulka, S. K.; Rosnovskii, S. V.

    2014-02-01

    A unified automated system for accounting and control of radioactive substances and radioactive wastes was developed at the Novovoronezh nuclear power plant. The system consists of several interconnected subsystems, which can be developed and put in operation in a stage-wise manner. As of the first quarter of 2013, the subsystems for accounting liquid and solid radioactive wastes, very low-active wastes, and tracers have been developed. The experience gained from the development and putting in use of these systems showed that this is an efficient, timely, and much needed software product.

  4. Adaptive control of the unique mobility EV drive system to account for time-varying battery parameters

    SciTech Connect

    Kopf, C.

    1995-07-01

    Unique Mobility developed an electric vehicle drive system which is being used in the BMW E1. This system is comprised of a permanent magnet brushless DC motor, amplifier, and microprocessor controller. The system is capable of high torque (150 Nm) at low speeds (< 2,000 rpm) and constant power (32 kW) at higher speeds (to 8,000 rpm). The design of the system utilizes a 6 step drive in combination with microprocessor control. The topology of the drive was designed to maximize overall system efficiency. The control system was designed to operate smoothly while transitioning between different regions of operation. The controller must also regulate the torque to stay within all of the safety limits, two of which are under voltage and over voltage. The under voltage limit is used to prevent fully discharging the batteries to prolong their life, and the over voltage limit is necessary to protect the power devices in the amplifier and/or prevent outgassing of the battery. The maximum voltage from the motor in regeneration is a function of the regenerated current, the internal battery impedance in regeneration, and the open circuit bus voltage.the open circuit bus voltage and the internal battery impedance in regeneration varies with each different battery technology, and the batteries` short and long term charge/discharge history. The described drive system adapts to any battery technology by limiting the user to only the maximum instantaneous power that the battery can provide (in motoring) or accept (in regeneration).

  5. Insider Threat - Material Control and Accountability Mitigation

    SciTech Connect

    Powell, Danny H; Elwood Jr, Robert H; Roche, Charles T

    2011-01-01

    The technical objectives of nuclear safeguards are (1) the timely detection of diversion of significant quantities of nuclear material from peaceful uses to the manufacture of nuclear weapons or other nuclear explosive devices or for purposes unknown and (2) the deterrence of such diversion by the risk of early detection. The safeguards and security program must address both outsider threats and insider threats. Outsider threats are primarily addressed by the physical protection system. Insider threats can be any level of personnel at the site including passive or active insiders that could attempt protracted or abrupt diversion. This could occur by an individual acting alone or by collusion between an individual with material control and accountability (MC&A) responsibilities and another individual who has responsibility or control within both the physical protection and the MC&A systems. The insider threat is one that must be understood and incorporated into the safeguards posture. There have been more than 18 documented cases of theft or loss of plutonium or highly enriched uranium. The insider has access, authority, and knowledge, as well as a set of attributes, that make him/her difficult to detect. An integrated safeguards program is designed as a defense-in-depth system that seeks to prevent the unauthorized removal of nuclear material, to provide early detection of any unauthorized attempt to remove nuclear material, and to rapidly respond to any attempted removal of nuclear material. The program is also designed to support protection against sabotage, espionage, unauthorized access, compromise, and other hostile acts that may cause unacceptable adverse impacts on national security, program continuity, the health and safety of employees, the public, or the environment. Nuclear MC&A play an essential role in the capabilities of an integrated safeguards system to deter and detect theft or diversion of nuclear material. An integrated safeguards system with

  6. Energy accounting and optimization for mobile systems

    NASA Astrophysics Data System (ADS)

    Dong, Mian

    Energy accounting determines how much a software process contributes to the total system energy consumption. It is the foundation for evaluating software and has been widely used by operating system based energy management. While various energy accounting policies have been tried, there is no known way to evaluate them directly simply because it is hard to track every hardware use by software in a heterogeneous multi-core system like modern smartphones and tablets. In this thesis, we provide the ground truth for energy accounting based on multi-player game theory and offer the first evaluation of existing energy accounting policies, revealing their important flaws. The proposed ground truth is based on Shapley value, a single value solution to multi-player games of which four axiomatic properties are natural and self-evident to energy accounting. To obtain the Shapley value-based ground truth, one only needs to know if a process is active during the time under question and the system energy consumption during the same time. We further provide a utility optimization formulation of energy management and show, surprisingly, that energy accounting does not matter for existing energy management solutions that control the energy use of a process by giving it an energy budget, or budget based energy management (BEM). We show an optimal energy management (OEM) framework can always outperform BEM. While OEM does not require any form of energy accounting, it is related to Shapley value in that both require the system energy consumption for all possible combination of processes under question. We provide a novel system solution that meet this requirement by acquiring system energy consumption in situ for an OS scheduler period, i.e.,10 ms. We report a prototype implementation of both Shapley value-based energy accounting and OEM based scheduling. Using this prototype and smartphone workload, we experimentally demonstrate how erroneous existing energy accounting policies can

  7. Enhancing the Material Control & Accounting Measurement System at the State Scientific Center of the Russian Federation - Institute for Physics and Power Engineering named after A.I. Leypunsky

    SciTech Connect

    Scherer, Carolynn P.; Bezhunov, Gennady M.; Bogdanov, Sergey A.; Gorbachev, Vyacheslav M.; Ryazanov, Boris G.; Talanov, Vladimir V.

    2012-07-11

    Nuclear material control and accounting (NMCA) system is improving under cooperation with USA national laboratories. Standard reference materials (RMs) and measurement techniques certified at IPPE level are required for: instrument calibration, verification measurements of parameters of items and materials, measurement error estimation, and quality control measurements. We present the main results for development of nuclear RMs for two uranium strata and the results for certification of three measurement techniques (MT) for U-235 mass fraction in uranium and U-235 mass in items. We present the results for developing measurement techniques for Pu-239 in PuO{sub 2}.

  8. Improving the Internal Accounting Controls of Educational Institutions.

    ERIC Educational Resources Information Center

    Apostolou, Nicholas G.; And Others

    1986-01-01

    Accounting controls are primarily concerned with methods and procedures that safeguard an entity's assets and ensure the reliability of its financial records. This article discusses internal control objectives as applied to educational institutions, outlines specific steps necessary to develop an effective internal control system, and mentions…

  9. Implementing New Methods of Laser Marking of Items in the Nuclear Material Control and Accountability System at SSC RF-IPPE: An Automated Laser Marking System

    SciTech Connect

    Regoushevsky, V I; Tambovtsev, S D; Dvukhsherstnov, V G; Efimenko, V F; Ilyantsev, A I; Russ III, G P

    2009-05-18

    For over ten years SSC RF-IPPE, together with the US DOE National Laboratories, has been working on implementing automated control and accountability methods for nuclear materials and other items. Initial efforts to use adhesive bar codes or ones printed (painted) onto metal revealed that these methods were inconvenient and lacked durability under operational conditions. For NM disk applications in critical stands, there is the additional requirement that labels not affect the neutron characteristics of the critical assembly. This is particularly true for the many stainless-steel clad disks containing highly enriched uranium (HEU) and plutonium that are used at SSC RF-IPPE for modeling nuclear power reactors. In search of an alternate method for labeling these disks, we tested several technological options, including laser marking and two-dimensional codes. As a result, the method of laser coloring was chosen in combination with Data Matrix ECC200 symbology. To implement laser marking procedures for the HEU disks and meet all the nuclear material (NM) handling standards and rules, IPPE staff, with U.S. technical and financial support, implemented an automated laser marking system; there are also specially developed procedures for NM movements during laser marking. For the laser marking station, a Zenith 10F system by Telesis Technologies (10 watt Ytterbium Fiber Laser and Merlin software) is used. The presentation includes a flowchart for the automated system and a list of specially developed procedures with comments. Among other things, approaches are discussed for human-factor considerations. To date, markings have been applied to numerous steel-clad HEU disks, and the work continues. In the future this method is expected to be applied to other MC&A items.

  10. Accounting and Accountability for Distributed and Grid Systems

    NASA Technical Reports Server (NTRS)

    Thigpen, William; McGinnis, Laura F.; Hacker, Thomas J.

    2001-01-01

    While the advent of distributed and grid computing systems will open new opportunities for scientific exploration, the reality of such implementations could prove to be a system administrator's nightmare. A lot of effort is being spent on identifying and resolving the obvious problems of security, scheduling, authentication and authorization. Lurking in the background, though, are the largely unaddressed issues of accountability and usage accounting: (1) mapping resource usage to resource users; (2) defining usage economies or methods for resource exchange; (3) describing implementation standards that minimize and compartmentalize the tasks required for a site to participate in a grid.

  11. 5 CFR 10.2 - Accountability systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Accountability systems. 10.2 Section 10.2 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.2 Accountability systems. The Director...

  12. 5 CFR 10.2 - Accountability systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Accountability systems. 10.2 Section 10.2 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.2 Accountability systems. The Director...

  13. 17 CFR 240.17Ad-13 - Annual study and evaluation of internal accounting control.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... internal accounting control. 240.17Ad-13 Section 240.17Ad-13 Commodity and Securities Exchanges SECURITIES... Company Rules § 240.17Ad-13 Annual study and evaluation of internal accounting control. (a) Accountant's... accountant concerning the transfer agent's system of internal accounting control and related procedures...

  14. 5 CFR 10.2 - Accountability systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.2 Accountability systems. The Director of the Office of Personnel Management may require an agency to establish and maintain a system...

  15. 5 CFR 10.2 - Accountability systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.2 Accountability systems. The Director of the Office of Personnel Management may require an agency to establish and maintain a system...

  16. 5 CFR 10.2 - Accountability systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.2 Accountability systems. The Director of the Office of Personnel Management may require an agency to establish and maintain a system...

  17. Accounting Control Technology Using SAP: A Case-Based Approach

    ERIC Educational Resources Information Center

    Ragan, Joseph; Puccio, Christopher; Talisesky, Brandon

    2014-01-01

    The Sarbanes-Oxley Act (SOX) revolutionized the accounting and audit industry. The use of preventative and process controls to evaluate the continuous audit process done via an SAP ERP ECC 6.0 system is key to compliance with SOX and managing costs. This paper can be used in a variety of ways to discuss issues associated with auditing and testing…

  18. Methods of Verification, Accountability and Control of Special Nuclear Material

    SciTech Connect

    Stewart, J.E.

    1999-05-03

    This session demonstrates nondestructive assay (NDA) measurement, surveillance and analysis technology required to protect, control and account (MPC and A) for special nuclear materials (SNM) in sealed containers. These measurements, observations and analyses comprise state-of-the art, strengthened, SNM safeguards systems. Staff member specialists, actively involved in research, development, training and implementation worldwide, will present six NDA verification systems and two software tools for integration and analysis of facility MPC and A data.

  19. Precision digital control systems

    NASA Astrophysics Data System (ADS)

    Vyskub, V. G.; Rozov, B. S.; Savelev, V. I.

    This book is concerned with the characteristics of digital control systems of great accuracy. A classification of such systems is considered along with aspects of stabilization, programmable control applications, digital tracking systems and servomechanisms, and precision systems for the control of a scanning laser beam. Other topics explored are related to systems of proportional control, linear devices and methods for increasing precision, approaches for further decreasing the response time in the case of high-speed operation, possibilities for the implementation of a logical control law, and methods for the study of precision digital control systems. A description is presented of precision automatic control systems which make use of electronic computers, taking into account the existing possibilities for an employment of computers in automatic control systems, approaches and studies required for including a computer in such control systems, and an analysis of the structure of automatic control systems with computers. Attention is also given to functional blocks in the considered systems.

  20. An application of model-based reasoning to accounting systems

    SciTech Connect

    Nado, R.; Chams, M.; Delisio, J.; Hamscher, W.

    1996-12-31

    An important problem faced by auditors is gauging how much reliance can be placed on the accounting systems that process millions of transactions to produce the numbers summarized in a company`s financial statements. Accounting systems contain internal controls, procedures designed to detect and correct errors and irregularities that may occur in the processing of transactions. In a complex accounting system, it can be an extremely difficult task for the auditor to anticipate the possible errors that can occur and to evaluate the effectiveness of the controls at detecting them. An accurate analysis must take into account the unique features of each company`s business processes. To cope with this complexity and variability, the Comet system applies a model-based reasoning approach to the analysis of accounting systems and their controls. An auditor uses Comet to create a hierarchical flowchart model that describes the intended processing of business transactions by an accounting system and the operation of its controls. Comet uses the constructed model to automatically analyze the effectiveness of the controls in detecting potential errors. Price Waterhouse auditors have used Comet on a variety of real audits in several countries around the world.

  1. Accountability.

    ERIC Educational Resources Information Center

    The Newsletter of the Comprehensive Center-Region VI, 1999

    1999-01-01

    Controversy surrounding the accountability movement is related to how the movement began in response to dissatisfaction with public schools. Opponents see it as one-sided, somewhat mean-spirited, and a threat to the professional status of teachers. Supporters argue that all other spheres of the workplace have accountability systems and that the…

  2. Maintenance accountability, jobs, and inventory control (MAJIC) program

    SciTech Connect

    Adkisson, B P

    1990-01-01

    This document describes the operating procedures for the maintenance accountability, jobs, and inventory control (MAJIC) program for the Maintenance Management Department of the ORNL Instrumentation and Controls Division.

  3. Cost Accounting System for fusion studies

    SciTech Connect

    Hamilton, W.R.; Keeton, D.C.; Thomson, S.L.

    1985-12-01

    A Cost Accounting System that is applicable to all magnetic fusion reactor design studies has been developed. This system provides: (1) definitions of the elements of cost and methods for the combination of these elements to form a cost estimate; (2) a Code of Accounts that uses a functional arrangement for identification of the plant components; and (3) definitions and methods to analyze actual cost data so that the data can be directly reported into this Cost Accounting System. The purpose of the Cost Accounting System is to provide the structure for the development of a fusion cost data base and for the development of validated cost estimating procedures. This system has been developed through use at the Fusion Engineering Design Center (FEDC) and has been applied to different confinement concepts (tokamaks and tandem mirrors) and to different types of projects (experimental devices and commercial power plants). The use of this Cost Accounting System by all magnetic fusion projects will promote the development of a common cost data base, allow the direct comparison of cost estimates, and ultimately establish the cost credibility of the program.

  4. Accountability of the BC Transfer System

    ERIC Educational Resources Information Center

    British Columbia Council on Admissions and Transfer, 2005

    2005-01-01

    The purpose of the paper is to provide evidence that the Transfer System in British Columbia (BC) has been effective and therefore accountable for the public funding that supports that system. The paper attempts to show: (1) the multi-faceted nature, breadth and depth of research that has been conducted to determine the effectiveness of the BC…

  5. Leadership in Accountability for Professional Development Systems.

    ERIC Educational Resources Information Center

    Rude, Harvey; Stockhouse, Judy; Read, Jo Smith; Street, Steve; Murray, Karl

    The Professional Development Leadership Academy supports states in transforming systems of professional development. This paper investigates accountability considerations that are necessary to determine the impact and results of professional development from a state systems perspective. The five areas of focus that comprise the Academy knowledge…

  6. Accountability Systems: Performance Standards and Assessment.

    ERIC Educational Resources Information Center

    Rahn, Mikala L.; Holmes, Patricia

    1999-01-01

    This monograph provides a status report on issues related to accountability, including standards and assessments, data systems, and the role of incentives for schools, teachers, and students in improving student achievement. Using information gathered from the literature and interviews with state administrators of vocational education, this paper…

  7. Accounting Systems and the Electronic Office.

    ERIC Educational Resources Information Center

    Gafney, Leo

    1986-01-01

    Discusses a systems approach to accounting instruction and examines it from the viewpoint of four components: people (titles and responsibilities, importance of interaction), forms (nonpaper records such as microfiche, floppy disks, hard disks), procedures (for example, electronic funds transfer), and technology (for example, electronic…

  8. 78 FR 67225 - Amendments to Material Control and Accounting Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... COMMISSION 10 CFR Parts 40, 70, 72, 74, and 150 RIN 3150-AI61 Amendments to Material Control and Accounting... Commission (NRC) is proposing to amend its regulations for material control and accounting (MC&A) of special... would requirements be added to designate material balance areas, item control areas, and custodians?...

  9. Fuzzy controllers in nuclear material accounting

    SciTech Connect

    Zardecki, A.

    1994-10-01

    Fuzzy controllers are applied to predicting and modeling a time series, with particular emphasis on anomaly detection in nuclear material inventory differences. As compared to neural networks, the fuzzy controllers can operate in real time; their learning process does not require many iterations to converge. For this reason fuzzy controllers are potentially useful in time series forecasting, where the authors want to detect and identify trends in real time. They describe an object-oriented implementation of the algorithm advanced by Wang and Mendel. Numerical results are presented both for inventory data and time series corresponding to chaotic situations, such as encountered in the context of strange attractors. In the latter case, the effects of noise on the predictive power of the fuzzy controller are explored.

  10. Accountability in the UK Healthcare System: An Overview

    PubMed Central

    Peckham, Stephen

    2014-01-01

    Recent changes in the English National Health Service (NHS) have introduced new complexities into the accountability arrangements for healthcare services. This commentary describes how the new organizational structures have challenged the traditional centralized accountability structures by creating a more dispersed system of governance for local health-care commissioners. It sets the context of discussions about accountability in the UK NHS and then describes the key changes in England following the implementation of the NHS reforms in April 2013. The commentary concludes that while there is increased complexity of accountability within a more decentralized and fragmented healthcare system, the government's goal of achieving increased local autonomy and greater control by general practitioners (GPs) will probably not be realized. In particular, the system will continue to have strongly centralized aspects, with increased regulation and central political responsibility. PMID:25305399

  11. SNM accounting systems: dBase versus C

    SciTech Connect

    Bearse, R.C.; Tisinger, R.M.; Ballmann, J.S.

    1989-01-01

    The Fuel Manufacturing Facility (FMF) at Argonne National Laboratories-West (ANL-W) in Idaho Falls accomplishes its internal special nuclear material accounting with a PC-based DYnamic Material ACcounting (PC/DYMAC) system developed as a collaboration between FMF and Los Alamos National Laboratory staff members. This system comprises four computers communicating via floppy disks containing transfer information. The accounting software was written in dBase and compiled under Clipper. The decision was made to network the computers and to speed the accounting process. Moreover, it was decided to extend the collaboration to Sandia National Laboratory staff and to incorporate their recently developed CAMUS and WATCH systems to automate data input and to provide a measure of material control. The current version of the code is being translated into the C language. The implications of such a change will be discussed. 9 refs., 3 figs.

  12. Design and implementation of an electronic investigational drug accountability system.

    PubMed

    Grilley, B J; Trissel, L A; Bluml, B M

    1991-12-01

    A software system designed to maintain protocol-specific investigational drug accountability records is described. The University of Texas M. D. Anderson Cancer Center and Cygnus Systems Development, Inc., worked together to create an electronic investigational drug accountability system (IDRx), which meets the requirements of the National Cancer Institute. This system performs record keeping, stores information on drugs and protocols, and generates standard and customized reports. On-screen assistance makes it easy to use. Security is achieved by granting access only to authorized users, and an audit trail is automatically generated. Systematic implementation at M. D. Anderson, initially in the investigational drug control area and subsequently in the satellite pharmacies, has resulted in increased accuracy and efficiency, and few problems have been encountered. The IDRx software package is useful for keeping records, generating reports, and tracking and evaluating data associated with an investigational drug accountability system. PMID:1814202

  13. Nuclear material control and accounting safeguards in the United States

    SciTech Connect

    Woltermann, H.A.; Rudy, C.R.; Rakel, D.A.; DeVer, E.A.

    1982-07-01

    Material control and accounting (MC and A) of special nuclear material (SNM) must supplement physical security to protect SNM from unlawful use such as terrorist activities. This article reviews MC and A safeguards of SNM in the United States. The following topics are covered: a brief perspective and history of MC and A safeguards, current MC and A practices, measurement methods for SNM, historical MC and A performance, a description of near-real-time MC and A systems, and conclusions on the status of MC and A in the United States.

  14. 17 CFR 140.24 - Control and accountability procedures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 17 Commodity and Securities Exchanges 1 2012-04-01 2012-04-01 false Control and accountability procedures. 140.24 Section 140.24 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION ORGANIZATION, FUNCTIONS, AND PROCEDURES OF THE COMMISSION Functions § 140.24 Control and accountability procedures. Persons entrusted...

  15. MAINTENANCE MANAGEMENT ACCOUNTING SYSTEM OF WASTE WATER DISPOSAL SYSTEMS

    NASA Astrophysics Data System (ADS)

    Hori, Michihiro; Tsuruta, Takashi; Kaito, Kiyoyuki; Kobayashi, Kiyoshi

    Sewage works facilities consist of various assets groups. And there are many kinds of financial resources. In order to optimize the maintenance plan, and to secure the stability and sustainability of sewage works management, it is necessary to carry out financial simulation based on the life-cycle cost analysis. Furthermore, it is important to develop management accounting system that is interlinked with the financial accounting system, because many sewage administration bodies have their financial accounting systems as public enterprises. In this paper, a management accounting system, which is designed to provide basic information for asset management of sewage works facilities, is presented. Also the applicability of the management accounting system presented in this paper is examined through financial simulations.

  16. Insider Threat - Material Control and Accountability Mitigation (Presentation)

    SciTech Connect

    Powell, Danny H; Elwood Jr, Robert H

    2011-01-01

    Why is the insider a concern? There are many documented cases of nuclear material available for sale - there are more insider diversions than outsider attacks and more than 18 documented cases of theft or loss of plutonium or highly enriched uranium. Insider attributes are: have access, has authority, possesses knowledge, works with absence of timeline, can test system, and may act alone or support a team. Material control and accountability (MC&A) is an essential part of an integrated safeguards system. Objectives of MC&A are: (1) Ongoing confirmation of the presence of special nuclear material (SNM) in assigned locations; (2) Prompt investigation of anomalies that may indicate a loss of SNM; (3) Timely and localized detection of loss, diversion, or theft of a goal quantity; (4) Rapid assessment and response to detection alarms; and (5) Timely generation of information to aid in the recovery of SNM in the event of an actual loss, diversion, or theft from the purview of the MC&A system. Control and accountability of material, equipment, and data are essential to minimizing insider threats.

  17. Integrated safeguards & security for material protection, accounting, and control.

    SciTech Connect

    Duran, Felicia Angelica; Cipiti, Benjamin B.

    2009-10-01

    Traditional safeguards and security design for fuel cycle facilities is done separately and after the facility design is near completion. This can result in higher costs due to retrofits and redundant use of data. Future facilities will incorporate safeguards and security early in the design process and integrate the systems to make better use of plant data and strengthen both systems. The purpose of this project was to evaluate the integration of materials control and accounting (MC&A) measurements with physical security design for a nuclear reprocessing plant. Locations throughout the plant where data overlap occurs or where MC&A data could be a benefit were identified. This mapping is presented along with the methodology for including the additional data in existing probabilistic assessments to evaluate safeguards and security systems designs.

  18. 48 CFR 32.503-3 - Initiation of progress payments and review of accounting system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... payments and review of accounting system. 32.503-3 Section 32.503-3 Federal Acquisition Regulations System... on Costs 32.503-3 Initiation of progress payments and review of accounting system. (a) For..., (2) possessed of an adequate accounting system and controls, and (3) in sound financial...

  19. Assessment of the Accounting and Joint Accounting/Computer Information Systems Programs.

    ERIC Educational Resources Information Center

    Appiah, John; Cernigliaro, James; Davis, Jeffrey; Gordon, Millicent; Richards, Yves; Santamaria, Fernando; Siegel, Annette; Lytle, Namy; Wharton, Patrick

    This document presents City University of New York LaGuardia Community College's Department of Accounting and Managerial Studies assessment of its accounting and joint accounting/computer information systems programs report, and includes the following items: (1) description of the mission and goals of the Department of Accounting and Managerial…

  20. Material Control and Accounting (MC&A) System Upgrades and Performance Testing at the Russian Federal Nuclear Center-All-Russian Scientific Research Institute of Experimental Physics (RFNC-VNIIEF) VNIIEF)

    SciTech Connect

    Bushmelev, Vadim; Viktorov, Vladimir; Zhikharev, Stanislav; Yuferev, Vladimir; Singh, Surinder Paul; Kuzminski, Jozef; Hogan, Kevin; McKisson, Jacquelin

    2008-01-01

    The All-Russian Scientific Research Institute of Experimental Physics (VNIIEF), founded in 1946 at the historic village of Sarov, in Nizhniy Novgorod Oblast, is the largest nuclear research center in the Rosatom complex. In the framework of international collaboration, the United States (US) Department of Energy/National Nuclear Security Agency, in cooperation with US national laboratories, on the one hand, Rosatom and VNIIEF on the other hand, have focused their cooperative efforts to upgrade the existing material protection control and accountability system to prevent unauthorized access to the nuclear material. In this paper we will discuss the present status of material control and accounting (MC&A) system upgrades and the preliminary results from a pilot program on the MC&A system performance testing that was recently conducted at one technical area.

  1. ReflectoActive{trademark} Seals for Materials Control and Accountability

    SciTech Connect

    Richardson, G.D.; Younkin, J.R.; Bell, Z.W.

    2002-01-01

    The ReflectoActive{trademark} Seals system, a continuously monitored fiber optic, active seal technology, provides real-time tamper indication for large arrays of storage containers. The system includes a PC running the RFAS software, an Immediate Detection Unit (IDU), an Optical Time Domain Reflectometer (OTDR), links of fiber optic cable, and the methods and devices used to attach the fiber optic cable to the containers. When a breach on any of the attached fiber optic cable loops occurs, the IDU immediately signals the connected computer to control the operations of an OTDR to seek the breach location. The ReflectoActive{trademark} Seals System can be adapted for various types of container closure designs and implemented in almost any container configuration. This automatic protection of valued assets can significantly decrease the time and money required for surveillance. The RFAS software is the multi-threaded, client-server application that monitors and controls the components of the system. The software administers the security measures such as a two-person rule as well as continuous event logging. Additionally the software's architecture provides a secure method by which local or remote clients monitor the system and perform administrative tasks. These features provide the user with a robust system to meet today's material control and accountability needs. A brief overview of the hardware, and different hardware configurations will be given. The architecture of the system software, and its benefits will then be discussed. Finally, the features to be implemented in future versions of the system will be presented.

  2. 32 CFR 2400.29 - Accountability and control.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAM Safeguarding § 2400.29 Accountability and control. (a) Each item of Top Secret, Secret, and... serve as Top Secret Control Officer (TSCO) for the Office of Science and Technology Policy and will be responsible for the supervision of the Top Secret control program. He/she will be assisted by an Assistant...

  3. 32 CFR 2400.29 - Accountability and control.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAM Safeguarding § 2400.29 Accountability and control. (a) Each item of Top Secret, Secret, and... serve as Top Secret Control Officer (TSCO) for the Office of Science and Technology Policy and will be responsible for the supervision of the Top Secret control program. He/she will be assisted by an Assistant...

  4. 32 CFR 2400.29 - Accountability and control.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAM Safeguarding § 2400.29 Accountability and control. (a) Each item of Top Secret, Secret, and... serve as Top Secret Control Officer (TSCO) for the Office of Science and Technology Policy and will be responsible for the supervision of the Top Secret control program. He/she will be assisted by an Assistant...

  5. 32 CFR 2400.29 - Accountability and control.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROGRAM Safeguarding § 2400.29 Accountability and control. (a) Each item of Top Secret, Secret, and... serve as Top Secret Control Officer (TSCO) for the Office of Science and Technology Policy and will be responsible for the supervision of the Top Secret control program. He/she will be assisted by an Assistant...

  6. 7 CFR 1767.12 - Accounting system requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Accounting system requirements. 1767.12 Section 1767..., DEPARTMENT OF AGRICULTURE (CONTINUED) ACCOUNTING REQUIREMENTS FOR RUS ELECTRIC BORROWERS Uniform System of Accounts § 1767.12 Accounting system requirements. (a) Each Rural Development electric borrower...

  7. 7 CFR 1767.12 - Accounting system requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Accounting system requirements. 1767.12 Section 1767..., DEPARTMENT OF AGRICULTURE (CONTINUED) ACCOUNTING REQUIREMENTS FOR RUS ELECTRIC BORROWERS Uniform System of Accounts § 1767.12 Accounting system requirements. (a) Each Rural Development electric borrower...

  8. 7 CFR 1767.12 - Accounting system requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Accounting system requirements. 1767.12 Section 1767..., DEPARTMENT OF AGRICULTURE (CONTINUED) ACCOUNTING REQUIREMENTS FOR RUS ELECTRIC BORROWERS Uniform System of Accounts § 1767.12 Accounting system requirements. (a) Each Rural Development electric borrower...

  9. 75 FR 54801 - Account Ownership and Control Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... October 7, 2010. \\1\\ 75 FR 41775 (July 19, 2010). DATES: Written comments must be received on or before... via e-mail at OCR@cftc.gov . ``Account Ownership and Control Report'' must be in the subject field...

  10. Automated system for accountability process tanks

    SciTech Connect

    Holt, S.H.

    1992-01-01

    An automated tank monitoring system has been installed in a plutonium processing plant at the Savannah River Site (SRS). This system reads tank instrumentation and displays the calculated volume, mass, and density of connected tanks while meeting the measurement control requirements of Department of Energy (DOE) Order 5633.3. The system has a self-checking feature that provides a high level of assurance that the instruments are functioning at a satisfactory level. Additionally, costs and radiation exposure to personnel are significantly reduce by eliminating calibration checks and allowing instrument calibration to be performed on an as needed basis.

  11. Automated system for accountability process tanks

    SciTech Connect

    Holt, S.H.

    1992-11-01

    An automated tank monitoring system has been installed in a plutonium processing plant at the Savannah River Site (SRS). This system reads tank instrumentation and displays the calculated volume, mass, and density of connected tanks while meeting the measurement control requirements of Department of Energy (DOE) Order 5633.3. The system has a self-checking feature that provides a high level of assurance that the instruments are functioning at a satisfactory level. Additionally, costs and radiation exposure to personnel are significantly reduce by eliminating calibration checks and allowing instrument calibration to be performed on an as needed basis.

  12. Augmented Automated Material Accounting Statistics System (AMASS)

    SciTech Connect

    Lumb, R.F.; Messinger, M.; Tingey, F.H.

    1983-07-01

    This paper describes an extension of the AMASS methodology which was previously presented at the 1981 INMM annual meeting. The main thrust of the current effort is to develop procedures and a computer program for estimating the variance of an Inventory Difference when many sources of variability, other than measurement error, are admitted in the model. Procedures also are included for the estimation of the variances associated with measurement error estimates and their effect on the estimated limit of error of the inventory difference (LEID). The algorithm for the LEID measurement component uncertainty involves the propagated component measurement variance estimates as well as their associated degrees of freedom. The methodology and supporting computer software is referred to as the augmented Automated Material Accounting Statistics System (AMASS). Specifically, AMASS accommodates five source effects. These are: (1) measurement errors (2) known but unmeasured effects (3) measurement adjustment effects (4) unmeasured process hold-up effects (5) residual process variation A major result of this effort is a procedure for determining the effect of bias correction on LEID, properly taking into account all the covariances that exist. This paper briefly describes the basic models that are assumed; some of the estimation procedures consistent with the model; data requirements, emphasizing availability and other practical considerations; discusses implications for bias corrections; and concludes by briefly describing the supporting computer program.

  13. A proposed ecosystem services classification system to support green accounting

    EPA Science Inventory

    There are a multitude of actual or envisioned, complete or incomplete, ecosystem service classification systems being proposed to support Green Accounting. Green Accounting is generally thought to be the formal accounting attempt to factor environmental production into National ...

  14. Principles for protecting material accounting systems from data falsification

    SciTech Connect

    Dunn, D.R.; McDonnel, J.L.; Chilton, P.D.; Kufahl, G.E.; Vergari, A.A.

    1980-09-30

    This study is part of a larger effort involving the development of regulatory licensing criteria and guidance for an upgraded material accounting rule for fixed-site, commercial nuclear fuel-cycle facilities. Our approach was to examine the vulnerability events of the Generic Minimal Material Accounting (GMMA) system from the point-of-view of a systems analyst and an internal auditor and then determine some acceptable methods for protecting them. During the course of this task, four protection principles were identified which have the potential of controlling against data falsification: Data Control (DC) - to provide assurance that sufficient controls be involved in the handling of data, especially with regard to the introduction of original data; Control on Controls (CC) - to ensure accuracy, validity, and integrity of information or procedures; Skip Echelon Verification (SEV) - to verify by senders of data that the data are properly used; and Secondary Echelon Forwarding (SEF) - to verify by recipients of data that the data were previously used in an appropriate manner by the sender. The extent to which these or other protection principles should be applied to achieve protection against data falsification and Special Nuclear Material (SNM) diversion depends on the degree of protection desired and the level of threat from which a system must be protected. Data falsification and SNM diversion must involve personnel, and the personnel of concern here are insiders who perform the accounting functions as well as those who have authorized access to the accounting elements. Therefore, protection principles must be implemented with regard to organizational constraints. Our approach to setting organizational criteria is basically to ensure that there is adequate separation of responsibilities for elements of control mechanisms.

  15. Creating Responsible and Responsive Accountability Systems. Report of the OERI State Accountability Study Group.

    ERIC Educational Resources Information Center

    Office of Educational Research and Improvement (ED), Washington, DC.

    Most states pursue accountability in public education by collecting and reporting school data, but types of data collected, and how those data are reported and used in holding schools accountable, differ from state to state. This report is designed for state policymakers desiring to refine their existing accountability systems. The report's six…

  16. 48 CFR 252.242-7006 - Accounting system administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Accounting system... of Provisions And Clauses 252.242-7006 Accounting system administration. As prescribed in 242.7503, use the following clause: Accounting System Administration (FEB 2012) (a) Definitions. As used in...

  17. 48 CFR 252.242-7006 - Accounting system administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Accounting system... of Provisions And Clauses 252.242-7006 Accounting system administration. As prescribed in 242.7503, use the following clause: ACCOUNTING SYSTEM ADMINISTRATION (MAY 2011) (a) Definitions. As used in...

  18. 48 CFR 252.242-7006 - Accounting system administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Accounting system... of Provisions And Clauses 252.242-7006 Accounting system administration. As prescribed in 242.7503, use the following clause: Accounting System Administration (FEB 2012) (a) Definitions. As used in...

  19. 48 CFR 252.242-7006 - Accounting system administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Accounting system... of Provisions And Clauses 252.242-7006 Accounting system administration. As prescribed in 242.7503, use the following clause: Accounting System Administration (FEB 2012) (a) Definitions. As used in...

  20. Control system design guide

    SciTech Connect

    Sellers, David; Friedman, Hannah; Haasl, Tudi; Bourassa, Norman; Piette, Mary Ann

    2003-05-01

    The ''Control System Design Guide'' (Design Guide) provides methods and recommendations for the control system design process and control point selection and installation. Control systems are often the most problematic system in a building. A good design process that takes into account maintenance, operation, and commissioning can lead to a smoothly operating and efficient building. To this end, the Design Guide provides a toolbox of templates for improving control system design and specification. HVAC designers are the primary audience for the Design Guide. The control design process it presents will help produce well-designed control systems that achieve efficient and robust operation. The spreadsheet examples for control valve schedules, damper schedules, and points lists can streamline the use of the control system design concepts set forth in the Design Guide by providing convenient starting points from which designers can build. Although each reader brings their own unique questions to the text, the Design Guide contains information that designers, commissioning providers, operators, and owners will find useful.

  1. 45 CFR 1301.13 - Accounting system certification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Accounting system certification. 1301.13 Section... START PROGRAM HEAD START GRANTS ADMINISTRATION General Requirements § 1301.13 Accounting system... shall submit an accounting system certification, prepared by an independent auditor, stating that...

  2. 45 CFR 1301.13 - Accounting system certification.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Accounting system certification. 1301.13 Section... START PROGRAM HEAD START GRANTS ADMINISTRATION General Requirements § 1301.13 Accounting system... shall submit an accounting system certification, prepared by an independent auditor, stating that...

  3. 45 CFR 1301.13 - Accounting system certification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Accounting system certification. 1301.13 Section... START PROGRAM HEAD START GRANTS ADMINISTRATION General Requirements § 1301.13 Accounting system... shall submit an accounting system certification, prepared by an independent auditor, stating that...

  4. 45 CFR 1301.13 - Accounting system certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... START PROGRAM HEAD START GRANTS ADMINISTRATION General Requirements § 1301.13 Accounting system... 45 Public Welfare 4 2010-10-01 2010-10-01 false Accounting system certification. 1301.13 Section... shall submit an accounting system certification, prepared by an independent auditor, stating that...

  5. Engine control techniques to account for fuel effects

    SciTech Connect

    Kumar, Shankar; Frazier, Timothy R.; Stanton, Donald W.; Xu, Yi; Bunting, Bruce G.; Wolf, Leslie R.

    2014-08-26

    A technique for engine control to account for fuel effects including providing an internal combustion engine and a controller to regulate operation thereof, the engine being operable to combust a fuel to produce an exhaust gas; establishing a plurality of fuel property inputs; establishing a plurality of engine performance inputs; generating engine control information as a function of the fuel property inputs and the engine performance inputs; and accessing the engine control information with the controller to regulate at least one engine operating parameter.

  6. California's First Year with Local Control Finance and Accountability

    ERIC Educational Resources Information Center

    Menefee-Libey, David J.; Kerchner, Charles Taylor

    2015-01-01

    In 2013, Governor Jerry Brown and the California legislature radically restructured the state's school funding system and accountability systems with a weighted student formula and a mandated local planning process in each district. The new law substitutes local politics and grassroots agency for state-driven mandates and compliance reviews. While…

  7. Accountability.

    ERIC Educational Resources Information Center

    Lashway, Larry

    1999-01-01

    This issue reviews publications that provide a starting point for principals looking for a way through the accountability maze. Each publication views accountability differently, but collectively these readings argue that even in an era of state-mandated assessment, principals can pursue proactive strategies that serve students' needs. James A.…

  8. The Demand for Accountability: Can Society Exercise Control Over Education?

    ERIC Educational Resources Information Center

    Broudy, Harry S.

    1977-01-01

    Argues that unless there is a general agreement in society about the purpose of education, until the school can control the factors that determine success, and until the school can ask all children to enter a common cultural tradition, the school can only respond to the demand for accountability by pleading impotence or by shifting it to those who…

  9. 76 FR 28193 - Amendments to Material Control and Accounting Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-16

    ... Regulations AGENCY: Nuclear Regulatory Commission. ACTION: Availability of preliminary proposed rule language... proposed rule language concerning the NRC's proposed amendments to the material control and accounting (MC...-mail to pdr.resource@nrc.gov . The preliminary proposed rule language is available electronically...

  10. An Internet-Based Accounting Information Systems Project

    ERIC Educational Resources Information Center

    Miller, Louise

    2012-01-01

    This paper describes a student project assignment used in an accounting information systems course. We are now truly immersed in the internet age, and while many required accounting information systems courses and textbooks introduce database design, accounting software development, cloud computing, and internet security, projects involving the…

  11. 7 CFR 1770.11 - Accounting system requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... System of Accounts § 1770.11 Accounting system requirements. (a) Each RUS borrower subject to the jurisdiction of the Federal Communications Commission (FCC) or a State regulatory body shall maintain its... Commission's Rules and Regulations. (1) RUS borrowers maintaining the accounts prescribed in 47 CFR part...

  12. Identifying Employer Needs from Accounting Information Systems Programs

    ERIC Educational Resources Information Center

    Dillon, Thomas W.; Kruck, S. E.

    2008-01-01

    As the need for new hires with accounting and information technology knowledge increases, a new major in accounting information systems (AIS) has emerged. This new AIS degree is a hybrid of accounting concepts and common business subjects combined with key information technology issues. Employers were presented with 56 core content areas found in…

  13. Financial Accounting for Local and State School Systems.

    ERIC Educational Resources Information Center

    Barr, Richard H.

    The primary purpose of this handbook is to reflect changes that have occurred in governmental accounting and educational finance since 1973. Major emphasis is placed on defining account classifications that provide meaningful financial management information. After describing the need for and advantages of a proposed account classification system,…

  14. 7 CFR 1770.11 - Accounting system requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Commission's Rules and Regulations. (1) RUS borrowers maintaining the accounts prescribed in 47 CFR part 32... CFR part 32 for Class A companies. (3) RUS borrowers maintaining the accounts prescribed for Class B... 7 Agriculture 12 2014-01-01 2013-01-01 true Accounting system requirements. 1770.11 Section...

  15. 7 CFR 1770.11 - Accounting system requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Commission's Rules and Regulations. (1) RUS borrowers maintaining the accounts prescribed in 47 CFR part 32... CFR part 32 for Class A companies. (3) RUS borrowers maintaining the accounts prescribed for Class B... 7 Agriculture 12 2011-01-01 2011-01-01 false Accounting system requirements. 1770.11 Section...

  16. 40 CFR 96.50 - NOX Allowance Tracking System accounts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 21 2011-07-01 2011-07-01 false NOX Allowance Tracking System accounts... PROGRAMS (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS NOX Allowance Tracking System § 96.50 NOX Allowance Tracking System accounts. (a) Nature...

  17. 40 CFR 97.50 - NOX Allowance Tracking System accounts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 21 2011-07-01 2011-07-01 false NOX Allowance Tracking System accounts... PROGRAMS (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS NOX Allowance Tracking System § 97.50 NOX Allowance Tracking System accounts. (a) Nature and function of...

  18. 40 CFR 96.50 - NOX Allowance Tracking System accounts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false NOX Allowance Tracking System accounts... PROGRAMS (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS NOX Allowance Tracking System § 96.50 NOX Allowance Tracking System accounts. (a) Nature...

  19. 40 CFR 97.50 - NOX Allowance Tracking System accounts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false NOX Allowance Tracking System accounts... PROGRAMS (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS NOX Allowance Tracking System § 97.50 NOX Allowance Tracking System accounts. (a) Nature and function of...

  20. 40 CFR 97.50 - NOX Allowance Tracking System accounts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false NOX Allowance Tracking System accounts. 97.50 Section 97.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Tracking System § 97.50 NOX Allowance Tracking System accounts. (a) Nature and function of...

  1. 40 CFR 96.50 - NOX Allowance Tracking System accounts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false NOX Allowance Tracking System accounts. 96.50 Section 96.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... IMPLEMENTATION PLANS NOX Allowance Tracking System § 96.50 NOX Allowance Tracking System accounts. (a) Nature...

  2. 40 CFR 97.50 - NOX Allowance Tracking System accounts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false NOX Allowance Tracking System accounts. 97.50 Section 97.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Tracking System § 97.50 NOX Allowance Tracking System accounts. (a) Nature and function of...

  3. 40 CFR 96.50 - NOX Allowance Tracking System accounts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false NOX Allowance Tracking System accounts. 96.50 Section 96.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... IMPLEMENTATION PLANS NOX Allowance Tracking System § 96.50 NOX Allowance Tracking System accounts. (a) Nature...

  4. 40 CFR 96.50 - NOX Allowance Tracking System accounts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false NOX Allowance Tracking System accounts. 96.50 Section 96.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... IMPLEMENTATION PLANS NOX Allowance Tracking System § 96.50 NOX Allowance Tracking System accounts. (a) Nature...

  5. 40 CFR 97.50 - NOX Allowance Tracking System accounts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false NOX Allowance Tracking System accounts. 97.50 Section 97.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Tracking System § 97.50 NOX Allowance Tracking System accounts. (a) Nature and function of...

  6. Analysis of the role of an interfacility SNM accounting system

    SciTech Connect

    McDonnel, J.L.; Chilton, P.D.; Kufahl, G.E.; Vergari, A.A.; Dunn, D.R.

    1982-02-22

    Lawrence Livermore National Laboratory (LLNL) undertook the task of analyzing the actual and potential value of an interfacility NRC material accounting system in deterring and detecting both material diversion and facility material accounting data falsification. The most important conclusion is that only relatively minor changes are needed to upgrade the current NRC interfacility reporting system. The emphasis of the task was on evaluating the usefulness of an NRC-monitored material accounting information system in providing protection against accounting fraud at the plant management or corporate level. The Nuclear Materials Management and Safeguards System (NMMSS) and the NRC Safeguards Status Report System (SSRS), the principal constituents of the current interfacility NRC material accounting information system, are described. Their relationship is shown in two information flow diagrams. Deterministic accounting checks and balances are discussed, both for the current NRC interfacility material accounting system and for an upgraded system. Detection mechanisms are described that would use currently available data and that could be exercised by the NRC in its safeguards management role. Additional checks and balances are recommended, with corresponding changes in data reporting requirements, to upgrade NRC interfacility material accounting system.

  7. Material control and accountability excess fissile material disposition

    SciTech Connect

    Snowden, S.A.

    1995-12-31

    The surplus fissile materials control and disposition project will present new concerns for safeguarding the surplus special nuclear material. Current methods of material control and accountability as well as physical security will be challenged. The challenges for safeguards will occur in whatever immobilization medium is used; i.e., ceramic, glass or Deep Borehole. If DOE Order 5633.3B is the controlling MC and A order, verification/confirmation measurements and the acceptance of these measurements must be done on large amounts of material in a very short time frame. Furthermore, if the excess material is to be spiked with fission product like 137 Cs, MC and A measurements after spiking need to be well thought out. A methodology and an agreement of what constitutes a valid measurement may need to be agreed to before processing starts. Safeguards concerns relating to immobilization must be considered in parallel with other concerns like criticality, plant design, and decommissioning. A project of this magnitude produces challenges for Material Control and Accountability, as well as physical security.

  8. Cost accounting, management control, and planning in health care.

    PubMed

    Siegrist, R B; Blish, C S

    1988-02-01

    Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS) PMID:3284338

  9. Wisconsin Elementary and Secondary School Accounting System Handbook.

    ERIC Educational Resources Information Center

    Nelson, C. Richard

    This handbook is the basic accounting document for Wisconsin's public school systems; it presents the means to achieve uniformity in reporting on the efficacy of the Wisconsin Elementary and Secondary School Accounting System (WESSAS). Its purpose is to provide financial information that will promote reporting, auditing, interdistrict comparison,…

  10. 14 CFR 1 - Introduction to System of Accounts and Reports

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Introduction to System of Accounts and Reports Section 1 Section Section 1 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS UNIFORM SYSTEM OF ACCOUNTS AND REPORTS FOR...

  11. College Bibliocentre Acquisition and Accounting System Description Manual.

    ERIC Educational Resources Information Center

    College Bibliocentre, Don Mills (Ontario).

    The Acquisition and Accounting System is a complex designed to perform all functions in the following areas: (1) ordering; (2) receipt, shipment and cancellation; (3) accounts payable, (4) invoicing, (5) order status, (6) inventory, (7) college budgeting and (8) management information reports. Some of the benefits that accrue from the system are:…

  12. AB 1725 Model Accountability System. California Community Colleges. Revised.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Board of Governors.

    This report proposes a model accountability system for the California community colleges to comply with the directives of Assembly Bill 1725 (AB 1725). The purpose of the accountability system is to provide colleges and districts, the board of governors, and the California legislature with information that will allow for the continued improvement…

  13. System Accountability Report 2013-14. Revised

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2015

    2015-01-01

    Information Resource Management - State University System of Florida (IRM-SUS) is the primary collector and provider of data concerning state universities that is used to make sound education policy decisions. The office provides technical assistance to those using the information, state and federal reporting support, those supplying information,…

  14. A passive automated personnel accountability system for reactor emergency preparedness

    SciTech Connect

    Zimmerman, R.O.; DeLisle, G.V.; Hickey, E.E.

    1988-04-01

    In 1985 a project was undertaken at the N Reactor on the Hanford Site to develop an automated personnel accountability system to ensure accountability of all personnel within 30 minutes of a site evacuation. The decision to develop such a system was made after a full-scale evacuation drill showed that the manual accountability system in use at the time was inadequate to meet the 30-minute requirement. Accountability systems at commercial nuclear power plants were evaluated, but found to be unsuitable because they were not passive, that is, they required action on part of the user for the system to work. Approximately 2500 people could be required to evacuate the 100-N Area. Therefore, a card key system or badge exchange system was judged not to be feasible. A passive accountability system was desired for N Reactor to allow personnel to enter and leave the site in a more timely manner. To meet the need for an automated accountability system at N Reactor, a special Evacuation Accountability System (EVACS) was designed and developed. The EVACS system has three basic components: the transponder, a credit card-sized device worn with the security badge; portal monitors, which are electronically activated by the transponder; and a computer information system that contains the personnel data base. Each person wearing a transponder is accounted for automatically by walking through a portal. In this paper, a description of the hardware and software will be presented, together with problems encountered and lessons learned while adapting an existing technology to this particular use. The system is currently installed and requires acceptance testing before becoming operational.

  15. Anomaly detection applied to a materials control and accounting database

    SciTech Connect

    Whiteson, R.; Spanks, L.; Yarbro, T.

    1995-09-01

    An important component of the national mission of reducing the nuclear danger includes accurate recording of the processing and transportation of nuclear materials. Nuclear material storage facilities, nuclear chemical processing plants, and nuclear fuel fabrication facilities collect and store large amounts of data describing transactions that involve nuclear materials. To maintain confidence in the integrity of these data, it is essential to identify anomalies in the databases. Anomalous data could indicate error, theft, or diversion of material. Yet, because of the complex and diverse nature of the data, analysis and evaluation are extremely tedious. This paper describes the authors work in the development of analysis tools to automate the anomaly detection process for the Material Accountability and Safeguards System (MASS) that tracks and records the activities associated with accountable quantities of nuclear material at Los Alamos National Laboratory. Using existing guidelines that describe valid transactions, the authors have created an expert system that identifies transactions that do not conform to the guidelines. Thus, this expert system can be used to focus the attention of the expert or inspector directly on significant phenomena.

  16. Rhode Island School and District Accountability System Technical Bulletin

    ERIC Educational Resources Information Center

    Rhode Island Department of Elementary and Secondary Education, 2007

    2007-01-01

    On January 8, 2002, the federal Elementary and Secondary Education Act (ESEA) was reauthorized as the No Child Left Behind Act (NCLB). NCLB required states to establish a single accountability system that includes every school and district. Rhode Island proposed an accountability model incorporating NCLB requirements to the US Department of…

  17. Roadmap for Next-Generation State Accountability Systems. Second Edition

    ERIC Educational Resources Information Center

    Council of Chief State School Officers, 2011

    2011-01-01

    This Roadmap, developed by the Council of Chief State School Officers (CCSSO) Next-Generation State Accountability Taskforce, presents a vision for next-generation accountability systems to support college and career readiness for all students. It is written by and for states, building on the leadership toward college and career readiness. This…

  18. Computer-Based Instruction in Accounting Using the CREATE System.

    ERIC Educational Resources Information Center

    Henkle, Edward B.; Robertson, Kenneth W.

    The Graduate Logistics program of the United States Air Force (USAF) Institute of Technology has required that prospective students show a satisfactory level of competence in basic accounting procedures before entering the program. The purpose of this thesis was to develop accounting case problems for use with the CREATE computer system that would…

  19. 34 CFR 200.12 - Single State accountability system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SECONDARY EDUCATION, DEPARTMENT OF EDUCATION TITLE I-IMPROVING THE ACADEMIC ACHIEVEMENT OF THE DISADVANTAGED... State's accountability system must— (1) Be based on the State's academic standards under § 200.1, academic assessments under § 200.2, and other academic indicators under § 200.19; (2) Take into account...

  20. 34 CFR 200.12 - Single State accountability system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SECONDARY EDUCATION, DEPARTMENT OF EDUCATION TITLE I-IMPROVING THE ACADEMIC ACHIEVEMENT OF THE DISADVANTAGED... State's accountability system must— (1) Be based on the State's academic standards under § 200.1, academic assessments under § 200.2, and other academic indicators under § 200.19; (2) Take into account...

  1. Accountability and health systems: toward conceptual clarity and policy relevance.

    PubMed

    Brinkerhoff, Derick W

    2004-11-01

    Improved accountability is often called for as an element in improving health system performance. At first glance, the notion of better accountability seems straightforward, but it contains a high degree of complexity. If accountability is to be more than an empty buzzword, conceptual and analytical clarity is required. This article elaborates a definition of accountability in terms of answerability and sanctions, and distinguishes three types of accountability: financial, performance and political/democratic. An analytic framework for mapping accountability is proposed that identifies linkages among health sector actors and assesses capacity to demand and supply information and exercise oversight and sanctions. The article describes three accountability purposes: reducing abuse, assuring compliance with procedures and standards, and improving performance/learning. Using an accountability lens can: (1) help to generate a system-wide perspective on health sector reform, (2) identify connections among individual improvement interventions, and (3) reveal gaps requiring policy attention. These results can enhance system performance, improve service delivery and contribute to sound policymaking. PMID:15459162

  2. Patient Accounting Systems: Are They Fit with the Users' Requirements?

    PubMed Central

    Ayatollahi, Haleh; Nazemi, Zahra

    2016-01-01

    Objectives A patient accounting system is a subsystem of a hospital information system. This system like other information systems should be carefully designed to be able to meet users' requirements. The main aim of this research was to investigate users' requirements and to determine whether current patient accounting systems meet users' needs or not. Methods This was a survey study, and the participants were the users of six patient accounting systems used in 24 teaching hospitals. A stratified sampling method was used to select the participants (n = 216). The research instruments were a questionnaire and a checklist. The mean value of ≥3 showed the importance of each data element and the capability of the system. Results Generally, the findings showed that the current patient accounting systems had some weaknesses and were able to meet between 70% and 80% of users' requirements. Conclusions The current patient accounting systems need to be improved to be able to meet users' requirements. This approach can also help to provide hospitals with more usable and reliable financial information. PMID:26893945

  3. Internal Control Systems in the Library Environment.

    ERIC Educational Resources Information Center

    Begg, Robert T.

    1985-01-01

    Examines system for safeguarding assets and guaranteeing reliability of library's financial records within context of management functions that comprise accounting controls: planning by budget or other standard of comparison; operation of effective accounting and record-keeping system; personnel management practices. Cash controls as example of…

  4. Miami-Dade Junior College Academic Accounting System.

    ERIC Educational Resources Information Center

    Miami-Dade Junior Coll., FL.

    The academic accounting system developed at Miami-Dade Junior College (Florida) is intended to aid in the instructional planning process. The objectives of the system are to: (1) compare various organizational arrangements for instruction; (2) provide a basis for the development of a cost effectiveness analysis system for instruction; (3) provide…

  5. 40 CFR 73.30 - Allowance tracking system accounts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Allowance tracking system accounts. 73.30 Section 73.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Allowance Tracking System § 73.30 Allowance tracking...

  6. 40 CFR 73.30 - Allowance tracking system accounts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 17 2012-07-01 2012-07-01 false Allowance tracking system accounts. 73.30 Section 73.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Allowance Tracking System § 73.30 Allowance tracking...

  7. 40 CFR 73.30 - Allowance tracking system accounts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Allowance tracking system accounts. 73.30 Section 73.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Allowance Tracking System § 73.30 Allowance tracking...

  8. 40 CFR 73.30 - Allowance tracking system accounts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Allowance tracking system accounts. 73.30 Section 73.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Allowance Tracking System § 73.30 Allowance tracking...

  9. 40 CFR 73.30 - Allowance tracking system accounts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Allowance tracking system accounts. 73.30 Section 73.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Allowance Tracking System § 73.30 Allowance tracking...

  10. Micro-Macro Bilateral Control Taking into Account Scaling of Control Gains

    NASA Astrophysics Data System (ADS)

    Susa, Shigeru; Shimono, Tomoyuki; Ohnishi, Kouhei

    In micro-macro bilateral control systems, it is important to use position and force scaling factors that depend on the size of the master and slave system. Moreover, it is vital for control systems to use appropriate control gains depending on the scaling ratio between master and slave response. This paper proposes a micro-macro bilateral control system based on the scaling of control gains. In this system, the control gains of the master and slave system are adjusted to appropriate values by using control gain scaling factors. These scaling factors are obtained by designing a micro-macro bilateral control system to achieve ideal reproducibility. To verify the validity of the proposed system, analytical results for the reproducibility, operationality, and stability of the proposed control system are presented in this paper. Moreover, the proposed system is used in an experimental micro-macro bilateral system, and the results are presented.

  11. A pilot workshop of nuclear material accounting and control of facilities

    SciTech Connect

    Li, T. K.; Wilkey, D. D.

    2004-01-01

    With collaboration among the US Department of Energy, International Atomic Energy Agency (IAEA), and the China Atomic Energy Authority (CAEA), we have developed a Pilot Workshop of Nuclear Material Accounting and Control at Facilities and offered on May 19-June 1, 2004 in Beijing, China. The purpose of the workshop is to provide instruction in facility-level safeguards and security to participants from China and other invited countries a variation on the traditional State System of Accounting and Control (SSAC) by focusing on the nuclear material control and accounting (MC&A) measures as applied at the facility level. Moreover, the shift in emphasis from the state system of accounting and control to the facility level offers an opportunity to address insider and terrorist threats. In this manner, the traditional SSAC course would be merged with issues more closely associated with nuclear security and terrorism prevention. All instruction and practical exercises were in English with sequential interpretation into Chinese. The workshop materials were in both English and Chinese. In addition to course lectures and invited guest lectures, all participants visited to a nuclear fuel fabrication plant used as a model for an exercise in designing the safeguards system for a bulk facility. This paper reports the result and experience of the workshop and discusses the course evaluation from participants.

  12. The ALICE Glance Shift Accounting Management System (SAMS)

    NASA Astrophysics Data System (ADS)

    Martins Silva, H.; Abreu Da Silva, I.; Ronchetti, F.; Telesca, A.; Maidantchik, C.

    2015-12-01

    ALICE (A Large Ion Collider Experiment) is an experiment at the CERN LHC (Large Hadron Collider) studying the physics of strongly interacting matter and the quark-gluon plasma. The experiment operation requires a 24 hours a day and 7 days a week shift crew at the experimental site, composed by the ALICE collaboration members. Shift duties are calculated for each institute according to their correlated members. In order to ensure the full coverage of the experiment operation as well as its good quality, the ALICE Shift Accounting Management System (SAMS) is used to manage the shift bookings as well as the needed training. ALICE SAMS is the result of a joint effort between the Federal University of Rio de Janeiro (UFRJ) and the ALICE Collaboration. The Glance technology, developed by the UFRJ and the ATLAS experiment, sits at the basis of the system as an intermediate layer isolating the particularities of the databases. In this paper, we describe the ALICE SAMS development process and functionalities. The database has been modelled according to the collaboration needs and is fully integrated with the ALICE Collaboration repository to access members information and respectively roles and activities. Run, period and training coordinators can manage their subsystem operation and ensure an efficient personnel management. Members of the ALICE collaboration can book shifts and on-call according to pre-defined rights. ALICE SAMS features a user profile containing all the statistics and user contact information as well as the Institutes profile. Both the user and institute profiles are public (within the scope of the collaboration) and show the credit balance in real time. A shift calendar allows the Run Coordinator to plan data taking periods in terms of which subsystems shifts are enabled or disabled and on-call responsible people and slots. An overview display presents the shift crew present in the control room and allows the Run Coordination team to confirm the presence

  13. A Grid storage accounting system based on DGAS and HLRmon

    NASA Astrophysics Data System (ADS)

    Cristofori, A.; Fattibene, E.; Gaido, L.; Guarise, A.; Veronesi, P.

    2012-12-01

    Accounting in a production-level Grid infrastructure is of paramount importance in order to measure the utilization of the available resources. While several CPU accounting systems are deployed within the European Grid Infrastructure (EGI), storage accounting systems, stable enough to be adopted in a production environment are not yet available. As a consequence, there is a growing interest in storage accounting and work on this is being carried out in the Open Grid Forum (OGF) where a Usage Record (UR) definition suitable for storage resources has been proposed for standardization. In this paper we present a storage accounting system which is composed of three parts: a sensor layer, a data repository with a transport layer (Distributed Grid Accounting System - DGAS) and a web portal providing graphical and tabular reports (HLRmon). The sensor layer is responsible for the creation of URs according to the schema (described in this paper) that is currently being discussed within OGF. DGAS is one of the CPU accounting systems used within EGI, in particular by the Italian Grid Infrastructure (IGI) and some other National Grid Initiatives (NGIs) and projects. DGAS architecture is evolving in order to collect Usage Records for different types of resources. This improvement allows DGAS to be used as a ‘general’ data repository and transport layer. HLRmon is the web portal acting as an interface to DGAS. It has been improved to retrieve storage accounting data from the DGAS repository and create reports in an easy way. This is very useful not only for the Grid users and administrators but also for the stakeholders.

  14. Principles and methods of managerial cost-accounting systems.

    PubMed

    Suver, J D; Cooper, J C

    1988-01-01

    An introduction to cost-accounting systems for pharmacy managers is provided; terms are defined and examples of specific applications are given. Cost-accounting systems determine, record, and report the resources consumed in providing services. An effective cost-accounting system must provide the information needed for both internal and external reports. In accounting terms, cost is the value given up to secure an asset. In determining how volumes of activity affect costs, fixed costs and variable costs are calculated; applications include pricing strategies, cost determinations, and break-even analysis. Also discussed are the concepts of direct and indirect costs, opportunity costs, and incremental and sunk costs. For most pharmacy department services, process costing, an accounting of intermediate outputs and homogeneous units, is used; in determining the full cost of providing a product or service (e.g., patient stay), job-order costing is used. Development of work-performance standards is necessary for monitoring productivity and determining product costs. In allocating pharmacy department costs, a ratio of costs to charges can be used; this method is convenient, but microcosting (specific identification of the costs of products) is more accurate. Pharmacy managers can use cost-accounting systems to evaluate the pharmacy's strategies, policies, and services and to improve budgets and reports. PMID:3348229

  15. Planning, budgeting, and controlling--one look at the future: case-mix cost accounting.

    PubMed Central

    Thompson, J D; Averill, R F; Fetter, R B

    1979-01-01

    This paper outlines the system for cost accounting and managerial control which is an extension of the usually accepted departmental costing systems and takes as its units the 383 Diagnosis Related Groups (DRGs) considered to be the hospital's products. It is held that such an approach offers hospital managers a more powerful, analytic, budgeting, and cost-finding tool and offers the opportunity to involve the medical staff in the issues of how their practice patterns are affecting hospital costs. PMID:511578

  16. Control system design method

    DOEpatents

    Wilson, David G.; Robinett, III, Rush D.

    2012-02-21

    A control system design method and concomitant control system comprising representing a physical apparatus to be controlled as a Hamiltonian system, determining elements of the Hamiltonian system representation which are power generators, power dissipators, and power storage devices, analyzing stability and performance of the Hamiltonian system based on the results of the determining step and determining necessary and sufficient conditions for stability of the Hamiltonian system, creating a stable control system based on the results of the analyzing step, and employing the resulting control system to control the physical apparatus.

  17. The Role of Politics and Governance in Educational Accountability Systems

    ERIC Educational Resources Information Center

    Brewer, Dominic J.; Killeen, Kieran M.; Welsh, Richard O.

    2013-01-01

    This brief utilizes case study methodology to illustrate the role of governance in educational accountability systems. Most research on the effectiveness of such systems has focused on technical components, such as standards-setting, assessments, rewards and sanctions, and data collection and reporting. This brief seeks to demonstrate that this…

  18. Diversity and Progress in School Accountability Systems in Australia

    ERIC Educational Resources Information Center

    Gurr, David

    2007-01-01

    School education in Australia is a complex interplay between federal and state governments, and between government and non-government schools. This article explores the supervision of schools in Australia through school accountability systems. Utilising publicly available documents a systematic analysis of the state and territory systems for…

  19. South Carolina Student Accountability System OSIRIS Instruction Manual.

    ERIC Educational Resources Information Center

    South Carolina State Dept. of Education, Columbia.

    This manual expresses the South Carolina State Department of Education's understanding of the new, computerized school administration system called OSIRIS and the policy regarding its use with the Student Accountability System (SAS). The SAS is a method used to obtain a cumulative headcount of students served in certain programs specified in the…

  20. Balancing the Contradictions between Accountability and Systemic Reform.

    ERIC Educational Resources Information Center

    Kersaint, Gladis; Borman, Kathryn M.; Lee, Reginald; Boydston, Theodore L.

    2001-01-01

    Examines effects of the National Urban League's Systemic Initiative reforms in four cities: Chicago, El Paso, Memphis, and Miami, based on an analysis of interviews with 47 principals. Principals must balance the demands of systemic math and science reforms with those of multilevel accountability policies. Such alignments may be unachievable.…

  1. GCFR plant control system

    SciTech Connect

    Estrine, E.A.; Greiner, H.G.

    1980-05-01

    A plant control system is being designed for a gas-cooled fast breeder reactor (GCFR) demonstration plant. Control analysis is being performed as an integral part of the plant design process to ensure that control requirements are satisfied as the plant design evolves. The load control portion of the plant control system provides stable automatic (closed-loop) control of the plant over the 25% to 100% load range. Simulation results are presented to demonstrate load control system performance. The results show that the plant is controllable at full load with the control system structure selected, but gain scheduling is required to achieve desired performance over the load range.

  2. Implementation Status of Accrual Accounting System in Health Sector

    PubMed Central

    Mehrolhassani, Mohammad Hossien; Khayatzadeh-Mahani, Akram; Emami, Mozhgan

    2015-01-01

    Introduction: Management of financial resources in health systems is one of the major issues of concern for policy makers globally. As a sub-set of financial management, accounting system is of paramount importance. In this paper, which presents part of the results of a wider research project on transition process from a cash accounting system to an accrual accounting system, we look at the impact of components of change on implementation of the new system. Implementing changes is fraught with many obstacles and surveying these challenges will help policy makers to better overcome them. Methods: The study applied a quantitative manner in 2012 at Kerman University of Medical Science in Iran. For the evaluation, a teacher made valid questionnaire with Likert scale was used (Cranach’s alpha of 0.89) which included 7 change components in accounting system. The study population was 32 subordinate units of Kerman University of Medical Sciences and for data analysis, descriptive and inferential statistics and correlation coefficient in SPSS version 19 were used. Results: Level of effect of all components on the implementation was average downward (5.06±1.86), except for the component “management & leadership (3.46±2.25)” (undesirable from external evaluators’ viewpoint) and “technology (6.61±1.92) and work processes (6.35±2.19)” (middle to high from internal evaluators’ viewpoint). Conclusions: Results showed that the establishment of accrual accounting system faces infrastructural challenges, especially the components of leadership and management and followers. As such, developing effective measures to overcome implementation obstacles should target these components. PMID:25560337

  3. Detecting errors and anomalies in computerized materials control and accountability databases

    SciTech Connect

    Whiteson, R.; Hench, K.; Yarbro, T.; Baumgart, C.

    1998-12-31

    The Automated MC and A Database Assessment project is aimed at improving anomaly and error detection in materials control and accountability (MC and A) databases and increasing confidence in the data that they contain. Anomalous data resulting in poor categorization of nuclear material inventories greatly reduces the value of the database information to users. Therefore it is essential that MC and A data be assessed periodically for anomalies or errors. Anomaly detection can identify errors in databases and thus provide assurance of the integrity of data. An expert system has been developed at Los Alamos National Laboratory that examines these large databases for anomalous or erroneous data. For several years, MC and A subject matter experts at Los Alamos have been using this automated system to examine the large amounts of accountability data that the Los Alamos Plutonium Facility generates. These data are collected and managed by the Material Accountability and Safeguards System, a near-real-time computerized nuclear material accountability and safeguards system. This year they have expanded the user base, customizing the anomaly detector for the varying requirements of different groups of users. This paper describes the progress in customizing the expert systems to the needs of the users of the data and reports on their results.

  4. Knowledge Sharing Systems: Advantages of Public Anonymity and Private Accountability

    ERIC Educational Resources Information Center

    Davis, Sarah

    2003-01-01

    This paper explores the benefits of the design elements of public anonymity and private accountability in classroom Knowledge Sharing Systems (KSS). The major findings of this study indicate that classroom KSS have the potential to allow for greater equity of input, reduce academic anxiety, increase teachers knowledge of student understanding …

  5. Accountability Report: The University System of Georgia, 1999.

    ERIC Educational Resources Information Center

    University System of Georgia, Atlanta.

    The accountability report of the Georgia University System summarizes expenditures and progress made in achieving earlier goals. Following an overview which identifies major strategies toward the goal of a more educated Georgia, a section summarizes progress on major initiatives broken down into those funded in 1995-1997 legislative sessions,…

  6. 45 CFR 1301.13 - Accounting system certification.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Accounting system certification. 1301.13 Section 1301.13 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES,...

  7. Bell Laboratories Book Acquisition, Accounting and Cataloging System (BELLTIP).

    ERIC Educational Resources Information Center

    Sipfle, William K.

    BELLTIP is an on-line library processing system concerned with book acquisitions, cataloging, and financial accounting for a newwork of 26 technical libraries. At its center is an interactively updated and queried set of files concerned with all items currently in process. Principal products include all purchase orders, claims, and cancellations;…

  8. How Principals and Teachers Respond to States' Accountability Systems

    ERIC Educational Resources Information Center

    Lee, Hyemi

    2013-01-01

    Since the 1990s, many states have started implementing standards-based reforms and developed their own accountability systems. Each state established academic content and performance standards, implemented test for all the students in grades 3 through 8 annually, and set up annual measurable objectives in reading and mathematics for districts,…

  9. Improving State Accountability Systems for Postsecondary Vocational Education.

    ERIC Educational Resources Information Center

    Sheets, Robert G.

    This paper makes recommendations for developing the next generation of state accountability systems for postsecondary vocational education (PVE). It focuses on the need to improve the core indicators for PVE; reduce the burden and improve the value of Carl D. Perkins Vocational and Applied Technology Education Amendments of 1998 (Perkins III)…

  10. Intergovernmental Approaches for Strengthening K-12 Accountability Systems

    ERIC Educational Resources Information Center

    Armour-Garb, Allison, Ed.

    2007-01-01

    This volume contains an edited transcript of the Rockefeller Institute's October 29, 2007 symposium (Chicago, IL) entitled "Intergovernmental Approaches to Strengthen K-12 Accountability Systems" as well as a framework paper circulated in preparation for the symposium. The transcript begins with a list of the forty state and federal education…

  11. Adapting Accountability Systems to the Limitations of Educational Measurement

    ERIC Educational Resources Information Center

    Kane, Michael

    2015-01-01

    Michael Kane writes in this article that he is in more or less complete agreement with Professor Koretz's characterization of the problem outlined in the paper published in this issue of "Measurement." Kane agrees that current testing practices are not adequate for test-based accountability (TBA) systems, but he writes that he is far…

  12. Hospital accounting and information systems: a critical assessment.

    PubMed

    Macintosh, N B

    1991-01-01

    Public sector organisations seem to be caught up in the global wave of 'neo-Thatcherism'. As such, they are being held 'accountable' today by their respective government finance departments for the costs and benefits of the services they provide to the general public. As the public purse tightens, hospitals (and related health service units) more and more compete with other public sector organisations (old-age pensions and services, post-secondary education, day-care centres, port authorities, unemployment insurance, parks and recreation, elite sport programs, aboriginal peoples aid and development, and so on) for a diminishing piece of what seems a smaller and smaller pie. In this 'fight-for-funding', hospitals seem particularly vulnerable. Sky-rocketing costs, public resentment of doctors' high income and a deliberate restriction and limiting of medical school places, among other things, contribute to general public antagonism. The message for hospitals is that cost-effective accountability will loom large when hospitals come begging at the public trough. Even left-wing politicians today seem to be heeding the words of free-market economists like Freedman of Chicago. 'Privatisation' is the constant threat for those deemed inefficient. As a consequence, hospital administrators around the world, caught up in this trend, seem to be stampeding to 'boot-up' some kind of new accounting information system. For example, at my own university hospital (Queen's University, Kingston, Canada), the hospital administrators are in the process of introducing a version of the Johns Hopkins Hospital (Baltimore, Maryland) case-mix-loading cost-accumulation system. In other parts of the world they are known by other fancy names such as 'patient-costing', 'diagnosis-related-groups' (or DRGs). Trendy accounting systems seem to be the order of the day, a sort of panacea for the current plague of problems hospitals face. As the new systems become operational, however, traditional

  13. Digital wireless control system

    NASA Astrophysics Data System (ADS)

    Smith, R.

    1993-08-01

    The Digital Wireless Control System (DWCS) is designed to initiate high explosives safely while using a wireless remote control system. Numerous safety features have been designed into the fire control system to mitigate the hazards associated with remote initiation of high explosives. These safety features range from a telemetry (TM) fire control status system to mechanical timers and keyed power lockout switches. The environment, safety, and health (ES&H) Standard Operating Procedure (SOP) SP471970 is intended as a guide when working with the DWCS. This report describes the Digital Wireless Control System and outlines each component's theory of operation and its relationship to the system.

  14. SCATS: SRB Cost Accounting and Tracking System handbook

    NASA Technical Reports Server (NTRS)

    Zorv, R. B.; Stewart, R. D.; Coley, G.; Higginbotham, M.

    1978-01-01

    The Solid Rocket Booster Cost Accounting and Tracking System (SCATS) which is an automatic data processing system designed to keep a running account of the number, description, and estimated cost of Level 2, 3, and 4 changes is described. Although designed specifically for the Space Shuttle Solid Rocket Booster Program, the ADP system can be used for any other program that has a similar structure for recording, reporting, and summing numbers and costs of changes. The program stores the alpha-numeric designators for changes, government estimated costs, proposed costs, and negotiated value in a MIRADS (Marshall Information Retrieval and Display System) format which permits rapid access, manipulation, and reporting of current change status. Output reports listing all changes, totals of each level, and totals of all levels, can be derived for any calendar interval period.

  15. Computer program for the automated attendance accounting system

    NASA Technical Reports Server (NTRS)

    Poulson, P.; Rasmusson, C.

    1971-01-01

    The automated attendance accounting system (AAAS) was developed under the auspices of the Space Technology Applications Program. The task is basically the adaptation of a small digital computer, coupled with specially developed pushbutton terminals located in school classrooms and offices for the purpose of taking daily attendance, maintaining complete attendance records, and producing partial and summary reports. Especially developed for high schools, the system is intended to relieve both teachers and office personnel from the time-consuming and dreary task of recording and analyzing the myriad classroom attendance data collected throughout the semester. In addition, since many school district budgets are related to student attendance, the increase in accounting accuracy is expected to augment district income. A major component of this system is the real-time AAAS software system, which is described.

  16. A materials accounting system for an IBM PC

    SciTech Connect

    Bearse, R.C.; Thomas, R.J.; Henslee, S.P.; Jackson, B.G.; Tracy, D.B.; Pace, D.M.

    1986-01-01

    The authors have adapted the Los Alamos MASS accounting system for use on an IBM PC/AT at the Fuels Manufacturing Facility (FMF) at Argonne National Laboratory West (ANL-WEST). Cost of hardware and proprietary software was less than $10,000 per station. The system consists of three stations between which accounting information is transferred using floppy disks accompanying special nuclear material shipments. The programs were implemented in dBASEIII and were compiled using the proprietary software CLIPPER. Modifications to the inventory can be posted in just a few minutes, and operator/computer interaction is nearly instantaneous. After the records are built by the user, it takes 4-5 seconds to post the results to the database files. A version of this system was specially adapted and is currently in use at the FMF facility at Argonne National Laboratory. Initial satisfaction is adequate and software and hardware problems are minimal.

  17. Developing standard performance testing procedures for material control and accounting components at a site

    SciTech Connect

    Scherer, Carolynn P; Bushlya, Anatoly V; Efimenko, Vladimir F; Ilyanstev, Anatoly; Regoushevsky, Victor I

    2010-01-01

    The condition of a nuclear material control and accountability system (MC&A) and its individual components, as with any system combining technical elements and documentation, may be characterized through an aggregate of values for the various parameters that determine the system's ability to perform. The MC&A system's status may be functioning effectively, marginally or not functioning based on a summary of the values of the individual parameters. This work included a review of the following subsystems, MC&A and Detecting Material Losses, and their respective elements for the material control and accountability system: (a) Elements of the MC&A Subsystem - Information subsystem (Accountancy/Inventory), Measurement subsystem, Nuclear Material Access subsystem, including tamper-indicating device (TID) program, and Automated Information-gathering subsystem; (b) Elements for Detecting Nuclear Material Loses Subsystem - Inventory Differences, Shipper/receiver Differences, Confirmatory Measurements and differences with accounting data, and TID or Seal Violations. In order to detect the absence or loss of nuclear material there must be appropriate interactions among the elements and their respective subsystems from the list above. Additionally this work includes a review of regulatory requirements for the MC&A system component characteristics and criteria that support the evaluation of the performance of the listed components. The listed components had performance testing algorithms and procedures developed that took into consideration the regulatory criteria. The developed MC&A performance-testing procedures were the basis for a Guide for MC&A Performance Testing at the material balance areas (MBAs) of State Scientific Center of the Russian Federation - Institute for Physics and Power Engineering (SSC RF-IPPE).

  18. Segment alignment control system

    NASA Technical Reports Server (NTRS)

    Aubrun, JEAN-N.; Lorell, Ken R.

    1988-01-01

    The segmented primary mirror for the LDR will require a special segment alignment control system to precisely control the orientation of each of the segments so that the resulting composite reflector behaves like a monolith. The W.M. Keck Ten Meter Telescope will utilize a primary mirror made up of 36 actively controlled segments. Thus the primary mirror and its segment alignment control system are directly analogous to the LDR. The problems of controlling the segments in the face of disturbances and control/structures interaction, as analyzed for the TMT, are virtually identical to those for the LDR. The two systems are briefly compared.

  19. Intelligent flight control systems

    NASA Technical Reports Server (NTRS)

    Stengel, Robert F.

    1993-01-01

    The capabilities of flight control systems can be enhanced by designing them to emulate functions of natural intelligence. Intelligent control functions fall in three categories. Declarative actions involve decision-making, providing models for system monitoring, goal planning, and system/scenario identification. Procedural actions concern skilled behavior and have parallels in guidance, navigation, and adaptation. Reflexive actions are spontaneous, inner-loop responses for control and estimation. Intelligent flight control systems learn knowledge of the aircraft and its mission and adapt to changes in the flight environment. Cognitive models form an efficient basis for integrating 'outer-loop/inner-loop' control functions and for developing robust parallel-processing algorithms.

  20. 25 CFR 542.19 - What are the minimum internal control standards for accounting?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... accounting? 542.19 Section 542.19 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN... accounting? (a) Each gaming operation shall prepare accurate, complete, legible, and permanent records of all... accounting records according to Generally Accepted Accounting Principles on a double-entry system...

  1. 25 CFR 542.19 - What are the minimum internal control standards for accounting?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... accounting? 542.19 Section 542.19 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN... accounting? (a) Each gaming operation shall prepare accurate, complete, legible, and permanent records of all... accounting records according to Generally Accepted Accounting Principles on a double-entry system...

  2. Temperature offset control system

    SciTech Connect

    Fried, M.

    1987-07-28

    This patent describes a temperature offset control system for controlling the operation of both heating and air conditioning systems simultaneously contained within the same premises each of which is set by local thermostats to operate at an appropriate temperature, the offset control system comprising: a central control station having means for presetting an offset temperature range, means for sensing the temperature at a central location, means for comparing the sensed temperature with the offset temperature range, means responsive to the comparison for producing a control signal indicative of whether the sensed temperature is within the offset temperature range or beyond the offset temperature range, and means for transmitting the control signal onto the standard energy lines servicing the premises; and a receiving station respectively associated with each heating and air conditioning system, the receiving stations each comprising means for receiving the same transmitted control signal from the energy lines, and switch means for controlling the energization of the respective system in response to the received control signal. The heating systems and associated local thermostat are disabled by the control signal when the control signal originates from a sensed temperature above the lower end of the offset temperature range. The air conditioning systems and associated thermostats are disabled by the same control signal when the control signal originates from a sensed temperature below the upper end of the offset temperature range.

  3. Production of an English/Russian glossary of terminology for nuclear materials control and accounting

    SciTech Connect

    Schachowskoj, S.; Smith, H.A. Jr.

    1995-05-01

    The program plans for Former Soviet Union National Nuclear Materials Control and Accounting (MC and A) Systems Enhancements call for the development of an English/Russian Glossary of MC and A terminology. This glossary was envisioned as an outgrowth of the many interactions, training sessions, and other talking and writing exercises that would transpire in the course of carrying out these programs. This report summarizes the status of the production of this glossary, the most recent copy of which is attached to this report. The glossary contains over 950 terms and acronyms associated with nuclear material control and accounting for safeguards and nonproliferation. This document is organized as follows: English/Russian glossary of terms and acronyms; Russian/English glossary of terms and acronyms; English/Russian glossary of acronyms; and Russian/English glossary of acronyms.

  4. Material protection, control and accounting cooperation at the Urals Electrochemical Integrated Plant (UEIP), Novouralsk, Russia

    SciTech Connect

    McAllister, S., LLNL

    1998-07-15

    The Urals Electrochemical Integrated Plant is one of the Russian Ministry of Atomic Energy`s nuclear material production sites participating in the US Department of Energy`s Material Protection, Control and Accounting (MPC&A) Program. The Urals Electrochemical Integrated Plant is Russia`s largest uranium enrichment facility and blends tons of high-enriched uranium into low enriched uranium each year as part of the US high-enriched uranium purchase. The Electrochemical Integrated Plant and six participating national laboratories are cooperating to implement a series of enhancements to the nuclear material protection, control, and accountability systems at the site This paper outlines the overall objectives of the MPC&A program at Urals Electrochemical Integrated Plant and the work completed as of the date of the presentation.

  5. Intermittent Control Systems

    ERIC Educational Resources Information Center

    Montgomery, Thomas L.; And Others

    1975-01-01

    The technique of intermittent control systems for air quality control as developed and used by the Tennessee Valley Authority is investigated. Although controversial, all Tennessee Valley Authority sulfur dioxide elimination programs are scheduled to be operational this year. Existing or anticipated intermittent control systems are identified. (BT)

  6. Automated Serials Control System.

    ERIC Educational Resources Information Center

    Pan, Elizabeth

    In 1967, the New York State Library at Albany (NYSL) developed a tape-oriented, off-line serials control system for 10,000 active titles. The system would perform all the serials control functions: bibliographic control, check-in of current receipts, claiming for gaps in receipts and late issues, binding notification for completed sets,…

  7. JT-60 Control System

    SciTech Connect

    Yonekawa, I.; Kawamata, Y.; Totsuka, T.; Akasaka, H.; Sueoka, M.; Kurihara, K.; Kimura, T.

    2002-09-15

    The present status of the JT-60U control system is reported including its original design concept, the progress of the system, and various modifications since the JT-60 upgrade. This control system has features of a functionally distributed and hierarchical structure, using CAMAC interfaces initially, which have been replaced by versatile module Europe (VME)-bus interfaces, and a protective interlock system composed of both software and hard-wired interlock logics. Plant monitoring and control are performed by efficient data communication through CAMAC highways and Ethernet with TCP/IP protocols. Sequential control of plasma discharges is executed by a combination of a remodeled VME-bus system and a timing system. A real-time plasma control system and a human interface system have been continuously modified corresponding to the progress of JT-60U experiments.

  8. Controlled exciton transfer between quantum dots with acoustic phonons taken into account

    SciTech Connect

    Golovinski, P. A.

    2015-09-15

    A system of excitons in two quantum dots coupled by the dipole–dipole interaction is investigated. The excitation transfer process controlled by the optical Stark effect at nonresonant frequencies is considered and the effect of the interaction between excitons and acoustic phonons in a medium on this process is taken into account. The system evolution is described using quantum Heisenberg equations. A truncated set of equations is obtained and the transfer dynamics is numerically simulated. High-efficiency picosecond switching of the excitation transfer by a laser pulse with a rectangular envelope is demonstrated. The dependence of picosecond switching on the quantum-dot parameters and optical-pulse length is presented.

  9. Accounting for Carbon Dioxide Emissions from Bioenergy Systems

    SciTech Connect

    Marland, Gregg

    2010-12-01

    Researchers have recently argued that there is a 'critical climate accounting error' and that we should say 'goodbye to carbon neutral' for bioenergy. Many other analysts have published opionions on the same topic, and the US Environmental Protection Agency posted a specific call for information. The currently burning questions for carbon accounting is how to deal with bioenergy. The questions arises because, unlike for fossil fuels, burning of biomass fuels represents part of a cycle in which combustion releases back to the atmosphere carbon that was earlier removed from the atmosphere by growing plants. In a sustainable system, plants will again remove the carbon dioxide (CO{sub 2}) from the atmosphere. Conceptually, it is clear that there are no net emissions of the greenhouse gas CO{sub 2} if biomass is harvested and combusted at the same rate that biomass grows and removes CO{sub 2} from the atmosphere. The problem lies in the fact that growth and combustion do not occur at the same time or in the same place, and our accounting system boundaries - spatial and temporal - frequently do not provide full and balanced accounting. When the first comprehensive guidelines for estimating national greenhouse gas emissions and sinks were put together by the Organization for Economic Cooperation and Development, they noted that it has been argued that CO{sub 2} emissions resulting from bioenergy consumption should not be included in a country's official emission inventory because there are no net emissions if the biomass is produced sustainably, and if the biomass is not produced sustainably, the loss of carbon will be captured as part of the accounting for emissions from land-use change. In the same philosophical vein, the Kyoto Protocol provides that emissions or sinks of CO{sub 2} from land-use change and forestry activities be measured as the 'verifiable changes in carbon stocks'. From these has grown the convention that emissions from biomass fuels are generally not

  10. An Active RFID Accountability System (RAS) for Constrained Wireless Environments

    SciTech Connect

    Barker, Alan M; Hanson, Gregory R; Sexton, Angela Kay; Jones Jr, J P; Freer, Eva B; Sjoreen, Andrea L

    2011-01-01

    A team from Oak Ridge National Laboratory (ORNL) has developed an RFID Accountability System (RAS) that allows items with active RFID tags to be tracked in environments where tags may not be able to transmit their location continuously. The system uses activators that transmit a short range signal. Active RFID tags are in a sleep state until they encounter an activator. Then they transmit a signal that is picked up by the antennas installed throughout the building. This paper presents the theory of operation, application areas, lessons learned, and key features developed over the course of seven years of development and use.

  11. Intelligent Control Systems Research

    NASA Technical Reports Server (NTRS)

    Loparo, Kenneth A.

    1994-01-01

    Results of a three phase research program into intelligent control systems are presented. The first phase looked at implementing the lowest or direct level of a hierarchical control scheme using a reinforcement learning approach assuming no a priori information about the system under control. The second phase involved the design of an adaptive/optimizing level of the hierarchy and its interaction with the direct control level. The third and final phase of the research was aimed at combining the results of the previous phases with some a priori information about the controlled system.

  12. Control and optimization system

    DOEpatents

    Xinsheng, Lou

    2013-02-12

    A system for optimizing a power plant includes a chemical loop having an input for receiving an input parameter (270) and an output for outputting an output parameter (280), a control system operably connected to the chemical loop and having a multiple controller part (230) comprising a model-free controller. The control system receives the output parameter (280), optimizes the input parameter (270) based on the received output parameter (280), and outputs an optimized input parameter (270) to the input of the chemical loop to control a process of the chemical loop in an optimized manner.

  13. The ILC control system.

    SciTech Connect

    Carwardine, J.; Saunders, C.; Arnold, N.; Lenkszus, F.; Rehlich, K.; Simrock, S.; Banerjee, b.; Chase, B.; Gottschalk, E.; Joireman, P.; Kasley, P.; Lackey, S.; McBride, P.; Pavlicek, V.; Patrick, J.; Votava, M.; Wolbers, S.; Furukawa, K.; Michizono, S.; Larson, R.S.; Downing, R.; DESY; FNAL; SLAC

    2007-01-01

    Since the last ICALEPCS, a small multi-region team has developed a reference design model for a control system for the International Linear Collider as part of the ILC Global Design Effort. The scale and performance parameters of the ILC accelerator require new thinking in regards to control system design. Technical challenges include the large number of accelerator systems to be controlled, the large scale of the accelerator facility, the high degree of automation needed during accelerator operations, and control system equipment requiring 'Five Nines' availability. The R&D path for high availability touches the control system hardware, software, and overall architecture, and extends beyond traditional interfaces into the technical systems. Software considerations for HA include fault detection through exhaustive out-of-band monitoring and automatic state migration to redundant systems, while the telecom industry's emerging ATCA standard - conceived, specified, and designed for High Availability - is being evaluated for suitability for ILC front-end electronics.

  14. KEKB accelerator control system

    NASA Astrophysics Data System (ADS)

    Akasaka, Nobumasa; Akiyama, Atsuyoshi; Araki, Sakae; Furukawa, Kazuro; Katoh, Tadahiko; Kawamoto, Takashi; Komada, Ichitaka; Kudo, Kikuo; Naito, Takashi; Nakamura, Tatsuro; Odagiri, Jun-ichi; Ohnishi, Yukiyoshi; Sato, Masayuki; Suetake, Masaaki; Takeda, Shigeru; Takeuchi, Yasunori; Yamamoto, Noboru; Yoshioka, Masakazu; Kikutani, Eji

    2003-02-01

    The KEKB accelerator control system including a control computer system, a timing distribution system, and a safety control system are described. KEKB accelerators were installed in the same tunnel where the TRISTAN accelerator was. There were some constraints due to the reused equipment. The control system is based on Experimental Physics and Industrial Control System (EPICS). In order to reduce the cost and labor for constructing the KEKB control system, as many CAMAC modules as possible are used again. The guiding principles of the KEKB control computer system are as follows: use EPICS as the controls environment, provide a two-language system for developing application programs, use VMEbus as frontend computers as a consequence of EPICS, use standard buses, such as CAMAC, GPIB, VXIbus, ARCNET, RS-232 as field buses and use ergonomic equipment for operators and scientists. On the software side, interpretive Python and SAD languages are used for coding application programs. The purpose of the radiation safety system is to protect personnel from radiation hazards. It consists of an access control system and a beam interlock system. The access control system protects people from strong radiation inside the accelerator tunnel due to an intense beam, by controlling access to the beamline area. On the other hand, the beam interlock system prevents people from radiation exposure by interlocking the beam operation. For the convenience of accelerator operation and access control, the region covered by the safety system is divided into three major access control areas: the KEKB area, the PF-AR area, and the beam-transport (BT) area. The KEKB control system required a new timing system to match a low longitudinal acceptance due to a low-alpha machine. This timing system is based on a frequency divider/multiply technique and a digital delay technique. The RF frequency of the KEKB rings and that of the injector Linac are locked with a common divisor frequency. The common

  15. Role of E-Payment System in Promoting Accountability in Government Ministries as Perceived by Accounting Education Graduates and Accountants in Ministry of Finance of Ebonyi State

    ERIC Educational Resources Information Center

    Azih, Nonye; Nwagwu, Lazarus

    2015-01-01

    This paper identified the role of electronic payment system in promoting accountability in government ministries as well as the challenges facing the implementation of e-payment in government ministries in Ebonyi State. The study was guided by two research questions and two hypotheses. The population of the study comprised of 112 accountants as…

  16. Autorotation flight control system

    NASA Technical Reports Server (NTRS)

    Bachelder, Edward N. (Inventor); Lee, Dong-Chan (Inventor); Aponso, Bimal L. (Inventor)

    2011-01-01

    The present invention provides computer implemented methodology that permits the safe landing and recovery of rotorcraft following engine failure. With this invention successful autorotations may be performed from well within the unsafe operating area of the height-velocity profile of a helicopter by employing the fast and robust real-time trajectory optimization algorithm that commands control motion through an intuitive pilot display, or directly in the case of autonomous rotorcraft. The algorithm generates optimal trajectories and control commands via the direct-collocation optimization method, solved using a nonlinear programming problem solver. The control inputs computed are collective pitch and aircraft pitch, which are easily tracked and manipulated by the pilot or converted to control actuator commands for automated operation during autorotation in the case of an autonomous rotorcraft. The formulation of the optimal control problem has been carefully tailored so the solutions resemble those of an expert pilot, accounting for the performance limitations of the rotorcraft and safety concerns.

  17. System identification for multivariable control

    NASA Astrophysics Data System (ADS)

    Vanzee, G. A.

    1981-05-01

    System identification methods and modern control theory are applied to industrial processes. These processes must often be controlled in order to meet certain requirements with respect to the product quality, safety, energy consumption, and environmental load. Modern control system design methods which take the occurring interaction phenomena and stochastic disturbances into account are used. An accurate dynamic mathematical model of the process, by theoretical modelling and/or by system identification is obtained. The computational aspects of two important types of identifications methods, i.e., stochastic realization and prediction error based parameter estimation are studied. The studied computational aspects are the robustness, the accuracy, and the computational costs of the methods. Theoretical analyses and applications to a multivariable pilot scale process, operating under closed loop conditions are investigated.

  18. Torque control system

    NASA Technical Reports Server (NTRS)

    Studenick, D. K.; Tyler, A. L.; Squillari, W.

    1975-01-01

    System stabilizes aximuth of gondolas which are carried by high-altitude balloons as platforms for tracking telescopes. When telescopes must be constantly aimed at specific targets, control system stabilizes gondola to within 5 arc-seconds.

  19. Can a safeguards accountancy system really detect an unauthorized removal

    SciTech Connect

    Ehinger, M.H.; Ellis, J.H.

    1981-11-01

    Theoretical investigations and system studies indicate safeguards material balance data from reprocessing plants can be used to detect unauthorized removals. Plant systems have been modeled and simulated data used to demonstrate the techniques. But how sensitive are the techniques when used with actual plant data. What is the effect of safeguards applications on plant operability. Can safeguards be acceptable to plant operators, and are there any benefits to be derived. The Barnwell Nuclear Fuel Plant (BNFP) has been devoted to answering these and other questions over the past several years. A computerized system of near-real-time accounting and in-process inventory has been implemented and demonstrated during actual plant test runs. Measured inventories and hourly material balance closures have been made to assess safeguards in an operating plant application. The tests have culminated in actual removals of material from the operating plant to investigate the response and measure the sensitivity of the safeguards and data evaluation system.

  20. 21 CFR 21.71 - Disclosure of records in Privacy Act Record Systems; accounting required.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... under the control of the United States for a civil or criminal law enforcement activity if the activity... between the Food and Drug Administration and the Department of Justice. In such cases, a general notation... Systems; accounting required. 21.71 Section 21.71 Food and Drugs FOOD AND DRUG ADMINISTRATION,...

  1. 21 CFR 21.71 - Disclosure of records in Privacy Act Record Systems; accounting required.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... under the control of the United States for a civil or criminal law enforcement activity if the activity... between the Food and Drug Administration and the Department of Justice. In such cases, a general notation... Systems; accounting required. 21.71 Section 21.71 Food and Drugs FOOD AND DRUG ADMINISTRATION,...

  2. 21 CFR 21.71 - Disclosure of records in Privacy Act Record Systems; accounting required.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... under the control of the United States for a civil or criminal law enforcement activity if the activity... between the Food and Drug Administration and the Department of Justice. In such cases, a general notation... Systems; accounting required. 21.71 Section 21.71 Food and Drugs FOOD AND DRUG ADMINISTRATION,...

  3. 21 CFR 21.71 - Disclosure of records in Privacy Act Record Systems; accounting required.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... under the control of the United States for a civil or criminal law enforcement activity if the activity... between the Food and Drug Administration and the Department of Justice. In such cases, a general notation... Systems; accounting required. 21.71 Section 21.71 Food and Drugs FOOD AND DRUG ADMINISTRATION,...

  4. 21 CFR 21.71 - Disclosure of records in Privacy Act Record Systems; accounting required.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... under the control of the United States for a civil or criminal law enforcement activity if the activity... between the Food and Drug Administration and the Department of Justice. In such cases, a general notation... Systems; accounting required. 21.71 Section 21.71 Food and Drugs FOOD AND DRUG ADMINISTRATION,...

  5. Inspection Report on "Internal Controls over Accountable Classified Removable Electronic Media at Oak Ridge National Laboratory"

    SciTech Connect

    2009-05-01

    The Department of Energy's Oak Ridge National Laboratory (ORNL) conducts cutting edge scientific research. ORNL utilizes removable electronic media, such as computer hard drives, compact disks, data tapes, etc., to store vast amounts of classified information. Incidents involving breakdowns in controls over classified removable electronic media have been a continuous challenge for the Department. The loss of even one piece of such media can have serious national security implications. In 2004, the Department had a complex-wide 'stand-down' of all activities using classified removable electronic media, and such media containing Secret/Restricted Data or higher classified data was designated 'Accountable Classified Removable Electronic Media' (ACREM). As part of the stand-down, sites were required to conduct a 100 percent physical inventory of all ACREM; enter it all into accountability; and conduct security procedure reviews and training. Further, the Department implemented a series of controls, including conducting periodic inventories, utilizing tamper proof devices on ACREM safes, and appointing trained custodians to be responsible for the material. After performance testing and validation that the required accountability systems were in place, ACREM operations at ORNL were approved for restart on August 10, 2004. We conducted a review at ORNL and associated facilities to determine whether ACREM is managed, protected, and controlled consistent with applicable requirements. We found that: (1) Eight pieces of Secret/Restricted Data media had not been identified as ACREM and placed into a system of accountability. Consequently, the items were not subject to all required protections and controls, such as periodic accountability inventories, oversight by a trained custodian, or storage in a designated ACREM safe. (However, the items were secured in safes approved for classified material.) (2) Other required ACREM protections and controls were not implemented as

  6. Novel microsatellite control system

    SciTech Connect

    Moore, K.R.; Frigo, J.R.; Tilden, M.W.

    1996-12-31

    The authors are developing extremely simple yet quite capable analog pulse-coded neural networks for smaller-faster-cheaper spacecraft attitude and control systems. They will demonstrate a prototype microsatellite that uses the novel control system to autonomously stabilize itself in the ambient magnetic field and point itself at the brightest available light source.

  7. Ensuring the Sustainability of Russian Federation National Nuclear Material Accounting System

    SciTech Connect

    Pitel, V; Kasumova, L; Kushnaryov, M; Babcock, R

    2006-06-07

    The Federal Nuclear Material Control and Accounting Information System (FIS) is the national information source on nuclear material accounting of the Russian Federation (RF). RF regulations mandated the creation of a national nuclear material accounting system to be managed by Federal Agency For Atomic Energy (Rosatom), and for the past decade, the FIS has been developed for all organizations required to report to Rosatom. The system represents a successful integration of U.S. financial support and consulting with Russian vision and technical expertise, creating a viable national nuclear material accounting system. This paper discusses crucial elements to ensure Sustainability of the FIS. A long-term plan for operation and maintenance of the information system is critical to a sustainable national accounting system. Plans undertaken throughout the FIS Project lifecycle have supported the necessary elements to ensure success. Through the next two years, long-term planning will be reevaluated and the successful elements and new initiatives will become part of an overall Operations Management Program. FIS resource needs will be managed through prioritization and ranking for each Program element, including: system operation; revising and implementing supporting regulations; establishing monitoring and control mechanisms to ensure validity of the data reported; maintaining and improving communication channels; and establishing regular FIS training. The results of a survey on improving FIS reporting, expected in June 2006, will be used in the prioritization and ranking process. Developing the Program and planning for long-term sustainability of the FIS will ensure a viable national nuclear material accounting system for the future.

  8. Peripheral Vascular Diagnostic Laboratory Record, Office Accounting and Research System

    PubMed Central

    Lofink, Raymond M.; Wolfson, Sidney K.; Lahoda, Edward J.

    1981-01-01

    A computerized Record, Office Accounting, and Research system (“ROAR”) has been developed for use in the Peripheral Vascular Diagnostic Laboratory of Montefiore Hospital, Pittsburgh, Pennsylvania. The interactive, menu-driven system utilizes an in-office microcomputer for maintaining patient records with a dial-up link to a time-sharing system at the University of Pittsburgh for performing research activities. Formats for internal storage, screen editing, and printed reports are easily specified to permit additions of new forms and upward-compatible versions of old forms. An on-line patient directory and an expandable library of floppy diskettes provide a large capacity of storage for permanent patient records. An interestingly simple, cost-effective, but powerful combination of three processors using commercial and custom-written software is presented.

  9. Cockpit control system

    NASA Technical Reports Server (NTRS)

    Lesnewski, David; Snow, Russ M.; Paufler, Dave; Schnieder, George; Athousake, Roxanne; Combs, Lisa

    1993-01-01

    The purpose of this project is to provide a detail design for the cockpit control system of the Viper PFT. The statement of work for this project requires provisions for control of the ailerons, elevator, rudder, and elevator trim. The system should provide adjustment for pilot stature, rigging, and maintenance. MIL-STD-1472 is used as a model for human factors criterion. The system is designed to the pilot limit loading outlined in FAR part 23.397. The general philosophy behind this design is to provide a simple, reliable control system which will withstand the daily abuse that is experienced in the training environment without excessive cost or weight penalties.

  10. Analyzing Feedback Control Systems

    NASA Technical Reports Server (NTRS)

    Bauer, Frank H.; Downing, John P.

    1987-01-01

    Interactive controls analysis (INCA) program developed to provide user-friendly environment for design and analysis of linear control systems, primarily feedback control. Designed for use with both small- and large-order systems. Using interactive-graphics capability, INCA user quickly plots root locus, frequency response, or time response of either continuous-time system or sampled-data system. Configuration and parameters easily changed, allowing user to design compensation networks and perform sensitivity analyses in very convenient manner. Written in Pascal and FORTRAN.

  11. Automatic clutch control system

    SciTech Connect

    Kasai, H.; Ogawa, N.; Hattori, T.; Ishihara, M.; Uriuhara, M.

    1986-12-16

    This patent describes an automatic clutch control system, comprising: a clutch having a full clutch engagement point and a clutch contact point; a clutch actuator for controlling a clutch stroke; a plurality of solenoid valves for controlling the clutch actuator; clutch stroke sensor means for measuring the clutch stroke and for detecting the full clutch engagement point and the clutch contact point in the clutch stroke; control means, for feeding back a stroke signal detected by the clutch stroke sensor and for controlling the solenoid valves to control clutch engagement and disengagement.

  12. Control of Vertebrate Respiration and Locomotion: A Brief Account.

    ERIC Educational Resources Information Center

    Feldman, Jack L.; Grillner, Sten

    1983-01-01

    Areas considered in this discussion include: activation/modulation of movement; control of motoneuronal discharge by excitation/inhibition; neural generation of movement synergies (considering interaction of central/peripheral elements, phasic gating of reflex effects, and neuronal organization of central pattern generators); protean nature of…

  13. 17 CFR 140.24 - Control and accountability procedures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the risk of compromise and reduce storage costs. (2) Top Secret documents, except for the controlled...) Records shall be maintained to show the number and distribution of reproduced copies to all Top Secret... custody of the Commission will be stored in accordance with the guidelines set forth in 32 CFR 2001.43....

  14. 17 CFR 140.24 - Control and accountability procedures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the risk of compromise and reduce storage costs. (2) Top Secret documents, except for the controlled...) Records shall be maintained to show the number and distribution of reproduced copies to all Top Secret... custody of the Commission will be stored in accordance with the guidelines set forth in 32 CFR 2001.43....

  15. 17 CFR 140.24 - Control and accountability procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the risk of compromise and reduce storage costs. (2) Top Secret documents, except for the controlled...) Records shall be maintained to show the number and distribution of reproduced copies to all Top Secret... custody of the Commission will be stored in accordance with the guidelines set forth in 32 CFR 2001.43....

  16. 32 CFR 2400.29 - Accountability and control.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....29 National Defense Other Regulations Relating to National Defense OFFICE OF SCIENCE AND TECHNOLOGY POLICY REGULATIONS TO IMPLEMENT E.O. 12356; OFFICE OF SCIENCE AND TECHNOLOGY POLICY INFORMATION SECURITY... serve as Top Secret Control Officer (TSCO) for the Office of Science and Technology Policy and will...

  17. Internal Controls for Accounting Areas. Alliance Action Information Sheets

    ERIC Educational Resources Information Center

    Technical Assistance ALLIANCE for Parent Centers, 2006

    2006-01-01

    Internal controls are important to ensure your Parent Center's resources are well protected. Steps should be taken to ensure that finance transactions are authorized by management, executed properly and on time, and recorded appropriately. Some centers may not have staff with all of the titles used in the procedures presented in this paper.…

  18. Common Control System Vulnerability

    SciTech Connect

    Trent Nelson

    2005-12-01

    The Control Systems Security Program and other programs within the Idaho National Laboratory have discovered a vulnerability common to control systems in all sectors that allows an attacker to penetrate most control systems, spoof the operator, and gain full control of targeted system elements. This vulnerability has been identified on several systems that have been evaluated at INL, and in each case a 100% success rate of completing the attack paths that lead to full system compromise was observed. Since these systems are employed in multiple critical infrastructure sectors, this vulnerability is deemed common to control systems in all sectors. Modern control systems architectures can be considered analogous to today's information networks, and as such are usually approached by attackers using a common attack methodology to penetrate deeper and deeper into the network. This approach often is composed of several phases, including gaining access to the control network, reconnaissance, profiling of vulnerabilities, launching attacks, escalating privilege, maintaining access, and obscuring or removing information that indicates that an intruder was on the system. With irrefutable proof that an external attack can lead to a compromise of a computing resource on the organization's business local area network (LAN), access to the control network is usually considered the first phase in the attack plan. Once the attacker gains access to the control network through direct connections and/or the business LAN, the second phase of reconnaissance begins with traffic analysis within the control domain. Thus, the communications between the workstations and the field device controllers can be monitored and evaluated, allowing an attacker to capture, analyze, and evaluate the commands sent among the control equipment. Through manipulation of the communication protocols of control systems (a process generally referred to as ''reverse engineering''), an attacker can then map out the

  19. Drone Control System

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Drones, subscale vehicles like the Firebees, and full scale retired military aircraft are used to test air defense missile systems. The DFCS (Drone Formation Control System) computer, developed by IBM (International Business Machines) Federal Systems Division, can track ten drones at once. A program called ORACLS is used to generate software to track and control Drones. It was originally developed by Langley and supplied by COSMIC (Computer Software Management and Information Center). The program saved the company both time and money.

  20. 34 CFR 690.81 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Payments § 690.81 Fiscal control and fund accounting procedures. (a) An institution shall follow provisions for maintaining general fiscal records in this part and in 34 CFR 668.24(b). (b) An institution shall... 34 Education 4 2014-07-01 2014-07-01 false Fiscal control and fund accounting procedures....

  1. 34 CFR 690.81 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Payments § 690.81 Fiscal control and fund accounting procedures. (a) An institution shall follow provisions for maintaining general fiscal records in this part and in 34 CFR 668.24(b). (b) An institution shall... 34 Education 4 2011-07-01 2011-07-01 false Fiscal control and fund accounting procedures....

  2. 29 CFR 458.32 - Provision for accounting and financial controls.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 2 2011-07-01 2011-07-01 false Provision for accounting and financial controls. 458.32 Section 458.32 Labor Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF... Additional Provisions Applicable § 458.32 Provision for accounting and financial controls. Every...

  3. 34 CFR 690.81 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Payments § 690.81 Fiscal control and fund accounting procedures. (a) An institution shall follow provisions for maintaining general fiscal records in this part and in 34 CFR 668.24(b). (b) An institution shall... 34 Education 4 2012-07-01 2012-07-01 false Fiscal control and fund accounting procedures....

  4. 34 CFR 690.81 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Payments § 690.81 Fiscal control and fund accounting procedures. (a) An institution shall follow provisions for maintaining general fiscal records in this part and in 34 CFR 668.24(b). (b) An institution shall... 34 Education 4 2013-07-01 2013-07-01 false Fiscal control and fund accounting procedures....

  5. 29 CFR 458.32 - Provision for accounting and financial controls.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 2 2012-07-01 2012-07-01 false Provision for accounting and financial controls. 458.32 Section 458.32 Labor Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF... Additional Provisions Applicable § 458.32 Provision for accounting and financial controls. Every...

  6. 29 CFR 458.32 - Provision for accounting and financial controls.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 2 2013-07-01 2013-07-01 false Provision for accounting and financial controls. 458.32 Section 458.32 Labor Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF... Additional Provisions Applicable § 458.32 Provision for accounting and financial controls. Every...

  7. 29 CFR 458.32 - Provision for accounting and financial controls.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 2 2010-07-01 2010-07-01 false Provision for accounting and financial controls. 458.32 Section 458.32 Labor Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF... Additional Provisions Applicable § 458.32 Provision for accounting and financial controls. Every...

  8. 34 CFR 690.81 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 690.81 Fiscal control and fund accounting procedures. (a) An institution shall follow provisions for maintaining general fiscal records in this part and in 34 CFR 668.24(b). (b) An institution shall maintain... 34 Education 3 2010-07-01 2010-07-01 false Fiscal control and fund accounting procedures....

  9. 29 CFR 458.32 - Provision for accounting and financial controls.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 2 2014-07-01 2014-07-01 false Provision for accounting and financial controls. 458.32 Section 458.32 Labor Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF... Additional Provisions Applicable § 458.32 Provision for accounting and financial controls. Every...

  10. 10 CFR 74.51 - Nuclear material control and accounting for strategic special nuclear material.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Nuclear material control and accounting for strategic special nuclear material. 74.51 Section 74.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Formula Quantities of Strategic Special...

  11. 10 CFR 74.51 - Nuclear material control and accounting for strategic special nuclear material.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Nuclear material control and accounting for strategic special nuclear material. 74.51 Section 74.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Formula Quantities of Strategic Special...

  12. 10 CFR 74.51 - Nuclear material control and accounting for strategic special nuclear material.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Nuclear material control and accounting for strategic special nuclear material. 74.51 Section 74.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Formula Quantities of Strategic Special...

  13. 10 CFR 74.51 - Nuclear material control and accounting for strategic special nuclear material.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Nuclear material control and accounting for strategic special nuclear material. 74.51 Section 74.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Formula Quantities of Strategic Special...

  14. 10 CFR 74.51 - Nuclear material control and accounting for strategic special nuclear material.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Nuclear material control and accounting for strategic special nuclear material. 74.51 Section 74.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Formula Quantities of Strategic Special...

  15. KMS fusion system resource accounting and performance measurement system for RSX11M V3. 2

    SciTech Connect

    Downward, J. G.

    1980-01-01

    Version 3.2 of the KMS FUSION accounting system is aimed at providing the user of RSX11M V3.2 with a versatile tool for measuring the performance of the operating system, tuning the system, and providing sufficient usage statistics so that the system manager can implement chargeback accounting if it is required by the installation. Sufficient hooks are provided so that the intrepid user can expand the system substantially beyond what is currently provided.

  16. Control and accountability in the NHS market: a practical proposition or logical impossibility?

    PubMed

    Glynn, J J; Perkins, D

    1998-01-01

    Before the imposition of the NHS internal market, systems of accountability and control were far from adequate and could be criticized on a number of grounds. The market was offered as a panacea to address these inadequacies. However, in practice there have only been partial improvements which could have been achieved without the imposition of the market. The market also creates new problems and a number of crises and scandals seem to be addressed at the political level by pleas to utilize resources more effectively. These pleas mean that more and more the focus is turning back to central planning in the provision of care and further away from so-called market mechanisms. The NHS "managed" market has been imperfect and will continue to be so. Argues that there is no alternative but to return to the planned provision of health care in order to improve on accountability and control in the NHS. Hopefully the adverse impact of the market on clinicians and others will force a more rational reappraisal of the fundamental raison d'être of the NHS and the need for those involved in the delivery of services, at all levels, to be more openly accountable. PMID:10351254

  17. Digital flight control systems

    NASA Technical Reports Server (NTRS)

    Caglayan, A. K.; Vanlandingham, H. F.

    1977-01-01

    The design of stable feedback control laws for sampled-data systems with variable rate sampling was investigated. These types of sampled-data systems arise naturally in digital flight control systems which use digital actuators where it is desirable to decrease the number of control computer output commands in order to save wear and tear of the associated equipment. The design of aircraft control systems which are optimally tolerant of sensor and actuator failures was also studied. Detection of the failed sensor or actuator must be resolved and if the estimate of the state is used in the control law, then it is also desirable to have an estimator which will give the optimal state estimate even under the failed conditions.

  18. Power Systems Control Architecture

    SciTech Connect

    James Davidson

    2005-01-01

    A diagram provided in the report depicts the complexity of the power systems control architecture used by the national power structure. It shows the structural hierarchy and the relationship of the each system to those other systems interconnected to it. Each of these levels provides a different focus for vulnerability testing and has its own weaknesses. In evaluating each level, of prime concern is what vulnerabilities exist that provide a path into the system, either to cause the system to malfunction or to take control of a field device. An additional vulnerability to consider is can the system be compromised in such a manner that the attacker can obtain critical information about the system and the portion of the national power structure that it controls.

  19. IGISOL control system modernization

    NASA Astrophysics Data System (ADS)

    Koponen, J.; Hakala, J.

    2016-06-01

    Since 2010, the IGISOL research facility at the Accelerator laboratory of the University of Jyväskylä has gone through major changes. Comparing the new IGISOL4 facility to the former IGISOL3 setup, the size of the facility has more than doubled, the length of the ion transport line has grown to about 50 m with several measurement setups and extension capabilities, and the accelerated ions can be fed to the facility from two different cyclotrons. The facility has evolved to a system comprising hundreds of manual, pneumatic and electronic devices. These changes have prompted the need to modernize also the facility control system taking care of monitoring and transporting the ion beams. In addition, the control system is also used for some scientific data acquisition tasks. Basic guidelines for the IGISOL control system update have been remote control, safety, usability, reliability and maintainability. Legacy components have had a major significance in the control system hardware and for the renewed control system software the Experimental Physics and Industrial Control System (EPICS) has been chosen as the architectural backbone.

  20. Load Control System Reliability

    SciTech Connect

    Trudnowski, Daniel

    2015-04-03

    This report summarizes the results of the Load Control System Reliability project (DOE Award DE-FC26-06NT42750). The original grant was awarded to Montana Tech April 2006. Follow-on DOE awards and expansions to the project scope occurred August 2007, January 2009, April 2011, and April 2013. In addition to the DOE monies, the project also consisted of matching funds from the states of Montana and Wyoming. Project participants included Montana Tech; the University of Wyoming; Montana State University; NorthWestern Energy, Inc., and MSE. Research focused on two areas: real-time power-system load control methodologies; and, power-system measurement-based stability-assessment operation and control tools. The majority of effort was focused on area 2. Results from the research includes: development of fundamental power-system dynamic concepts, control schemes, and signal-processing algorithms; many papers (including two prize papers) in leading journals and conferences and leadership of IEEE activities; one patent; participation in major actual-system testing in the western North American power system; prototype power-system operation and control software installed and tested at three major North American control centers; and, the incubation of a new commercial-grade operation and control software tool. Work under this grant certainly supported the DOE-OE goals in the area of “Real Time Grid Reliability Management.”

  1. Desiccant humidity control system

    NASA Technical Reports Server (NTRS)

    Amazeen, J. (Editor)

    1973-01-01

    A regenerable sorbent system was investigated for controlling the humidity and carbon dioxide concentration of the space shuttle cabin atmosphere. The sorbents considered for water and carbon dioxide removal were silica gel and molecular sieves. Bed optimization and preliminary system design are discussed along with system optimization studies and weight penalites.

  2. What is system control?

    SciTech Connect

    Hirst, E.; Kirby, B.

    1999-11-01

    Just as the aviation industry needs air-traffic controllers to manage the movement of airplanes for safety and commerce, so too, the electricity industry requires system operators. The electrical-system-control functions encompass a range of activities that support commercial transactions and maintain bulk-power reliability. As part of a project for the Edison Electric Institute, the authors examined the functions and costs of system control and the issues that need to be resolved in a restructured electricity industry (Hirst and Kirby 1998).

  3. Status of U.S. programs for material protection, control & accounting assistance to Ukraine and Kazakstan

    SciTech Connect

    Roche, C.T.; Zinneman, T.E.; Rudolph, R.R.

    1995-12-01

    The United States is one of several donor states providing technical assistance to the Newly Independent States (NIS) of the Former Soviet Union (FSU) for improving their systems for control of nuclear materials. Ukraine and Kazakstan have significant nuclear energy programs. Both countries have committed to nonproliferation of nuclear weapons. They have signed the NPT and have safeguards agreements with the U.S. concerning development of state systems of control, accounting and physical protection of nuclear materials. As directed by the DOE - International Safeguards Division (now the DOE - Russia/NIS Nuclear Materials Security Task Force), technical specialists from several national laboratories, including Argonne, Los Alamos, Oak Ridge, Pacific Northwest and Sandia, as well as representatives of other U.S. Government organizations, such as the NRC, DOD/DNA and the New Brunswick Laboratory, are interacting with government regulatory and facility personnel of Ukraine and Kazakstan. Argonne has program coordination responsibilities for both countries. In support of agreements between the U.S. and Ukraine and the U.S. and Kazakstan, the DOE is responsible for providing technical assistance and training to aid in the evaluation, design, development, and implementation of nuclear material safeguards. This assistance includes: (1) information systems for tracking and reporting the location of nuclear materials, (2) application of nuclear measurement techniques for verifying inventories, (3) material control and accounting (MC&A) systems, and (4) physical protection (PP) systems. Site survey teams, including both MC&A and PP experts from several national labs, have visited Ukraine and Kazakstan. This paper summarizes activities to date and future plans.

  4. Remotely controllable mixing system

    NASA Technical Reports Server (NTRS)

    Belew, R. R. (Inventor)

    1986-01-01

    This invention relates to a remotely controllable mixing system in which a plurality of mixing assemblies are arranged in an annular configuration, and wherein each assembly employs a central chamber and two outer, upper and lower chambers. Valves are positioned between chambers, and these valves for a given mixing assembly are operated by upper and lower control rotors, which in turn are driven by upper and lower drive rotors. Additionally, a hoop is compressed around upper control rotors and a hoop is compressed around lower control rotors to thus insure constant frictional engagement between all control rotors and drive rotors. The drive rollers are driven by a motor.

  5. 17 CFR 256.01-1 - Companies for which this system of accounts is prescribed.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... AND EXCHANGE COMMISSION (CONTINUED) UNIFORM SYSTEM OF ACCOUNTS FOR MUTUAL SERVICE COMPANIES AND... Accounts is not applicable to gas or electric utility companies; or companies primarily engaged (1)...

  6. Flight control actuation system

    NASA Technical Reports Server (NTRS)

    Wingett, Paul T. (Inventor); Gaines, Louie T. (Inventor); Evans, Paul S. (Inventor); Kern, James I. (Inventor)

    2004-01-01

    A flight control actuation system comprises a controller, electromechanical actuator and a pneumatic actuator. During normal operation, only the electromechanical actuator is needed to operate a flight control surface. When the electromechanical actuator load level exceeds 40 amps positive, the controller activates the pneumatic actuator to offset electromechanical actuator loads to assist the manipulation of flight control surfaces. The assistance from the pneumatic load assist actuator enables the use of an electromechanical actuator that is smaller in size and mass, requires less power, needs less cooling processes, achieves high output forces and adapts to electrical current variations. The flight control actuation system is adapted for aircraft, spacecraft, missiles, and other flight vehicles, especially flight vehicles that are large in size and travel at high velocities.

  7. NUCLEAR REACTOR CONTROL SYSTEM

    DOEpatents

    Epler, E.P.; Hanauer, S.H.; Oakes, L.C.

    1959-11-01

    A control system is described for a nuclear reactor using enriched uranium fuel of the type of the swimming pool and other heterogeneous nuclear reactors. Circuits are included for automatically removing and inserting the control rods during the course of normal operation. Appropriate safety circuits close down the nuclear reactor in the event of emergency.

  8. Adapting water accounting for integrated water resource management. The Júcar Water Resource System (Spain)

    NASA Astrophysics Data System (ADS)

    Momblanch, Andrea; Andreu, Joaquín; Paredes-Arquiola, Javier; Solera, Abel; Pedro-Monzonís, María

    2014-11-01

    An increase in water demands, exacerbated by climate change and the tightening of environmental requirements, leads to a reduction in available water resources for economic uses. This situation poses challenges for water resource planning and management. Water accounting has emerged as an appropriate tool to improve transparency and control in water management. There are multiple water accounting approaches, but they generally involve a very exhaustive list of accounted concepts. According to our findings in this research, one of the best water accounting methodologies is the Australian Water Accounting Standard. However, its implementation for integrated water resource planning and management purposes calls into questioning the amount of information and level of detail necessary for the users of water accounts. In this paper, we present a different method of applying the Australian Water Accounting Standard in relation to water resource management, which improves its utility. In order to compare the original approach and that proposed here, we present and discuss an application to the Júcar Water Resource System, in eastern Spain.

  9. Accounting carbon storage in decaying root systems of harvested forests.

    PubMed

    Wang, G Geoff; Van Lear, David H; Hu, Huifeng; Kapeluck, Peter R

    2012-05-01

    Decaying root systems of harvested trees can be a significant component of belowground carbon storage, especially in intensively managed forests where harvest occurs repeatedly in relatively short rotations. Based on destructive sampling of root systems of harvested loblolly pine trees, we estimated that root systems contained about 32% (17.2 Mg ha(-1)) at the time of harvest, and about 13% (6.1 Mg ha(-1)) of the soil organic carbon 10 years later. Based on the published roundwood output data, we estimated belowground biomass at the time of harvest for loblolly-shortleaf pine forests harvested between 1995 and 2005 in South Carolina. We then calculated C that remained in the decomposing root systems in 2005 using the decay function developed for loblolly pine. Our calculations indicate that the amount of C stored in decaying roots of loblolly-shortleaf pine forests harvested between 1995 and 2005 in South Carolina was 7.1 Tg. Using a simple extrapolation method, we estimated 331.8 Tg C stored in the decomposing roots due to timber harvest from 1995 to 2005 in the conterminous USA. To fully account for the C stored in the decomposing roots of the US forests, future studies need (1) to quantify decay rates of coarse roots for major tree species in different regions, and (2) to develop a methodology that can determine C stock in decomposing roots resulting from natural mortality. PMID:22535427

  10. 7 CFR 3560.302 - Accounting, bookkeeping, budgeting, and financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Financial Management § 3560.302 Accounting, bookkeeping, budgeting, and financial management systems. (a) General. Borrowers must establish the accounting, bookkeeping, budgeting and financial management... management plan. (3) Borrowers must notify the Agency of any changes in their accounting, bookkeeping,...

  11. 7 CFR 3560.302 - Accounting, bookkeeping, budgeting, and financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Financial Management § 3560.302 Accounting, bookkeeping, budgeting, and financial management systems. (a) General. Borrowers must establish the accounting, bookkeeping, budgeting and financial management... management plan. (3) Borrowers must notify the Agency of any changes in their accounting, bookkeeping,...

  12. 7 CFR 3560.302 - Accounting, bookkeeping, budgeting, and financial management systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Financial Management § 3560.302 Accounting, bookkeeping, budgeting, and financial management systems. (a) General. Borrowers must establish the accounting, bookkeeping, budgeting and financial management... management plan. (3) Borrowers must notify the Agency of any changes in their accounting, bookkeeping,...

  13. 7 CFR 3560.302 - Accounting, bookkeeping, budgeting, and financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Financial Management § 3560.302 Accounting, bookkeeping, budgeting, and financial management systems. (a) General. Borrowers must establish the accounting, bookkeeping, budgeting and financial management... management plan. (3) Borrowers must notify the Agency of any changes in their accounting, bookkeeping,...

  14. 7 CFR 3560.302 - Accounting, bookkeeping, budgeting, and financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Financial Management § 3560.302 Accounting, bookkeeping, budgeting, and financial management systems. (a) General. Borrowers must establish the accounting, bookkeeping, budgeting and financial management... management plan. (3) Borrowers must notify the Agency of any changes in their accounting, bookkeeping,...

  15. The ISOLDE control system

    NASA Astrophysics Data System (ADS)

    Deloose, I.; Pace, A.

    1994-12-01

    The two CERN isotope separators named ISOLDE have been running on the new Personal Computer (PC) based control system since April 1992. The new architecture that makes heavy use of the commercial software and hardware of the PC market has been implemented on the 1700 geographically distributed control channels of the two separators and their experimental area. Eleven MSDOS Intel-based PCs with approximately 80 acquisition and control boards are used to access the equipment and are controlled from three PCs running Microsoft Windows used as consoles through a Novell Local Area Network. This paper describes the interesting solutions found and discusses the reduced programming workload and costs that have been obtained.

  16. MFTF supervisory control system

    NASA Astrophysics Data System (ADS)

    1980-12-01

    A computerized supervisory control system is being developed for the Mirror Fusion Test Facility. The system includes nine Perkin-Elmer 7/32 and 8/32 computers connected by a block of common core memory (128 kilobytes). The network is a disk designed for reliability and redundancy. If one computer goes down, the local-control micro-processors that it controls are switched to another computer in a matter of seconds. The control consoles permit operators to open and close valves, start or stop pumps, and adjust operating levels. The experiment is controlled by two superconsoles and five satellite consoles. The software, written in PASCAL, contains such subsystems as organizing the computers into a network, operating the consoles and accessing the data base.

  17. Computer controlled antenna system

    NASA Technical Reports Server (NTRS)

    Raumann, N. A.

    1972-01-01

    The application of small computers using digital techniques for operating the servo and control system of large antennas is discussed. The advantages of the system are described. The techniques were evaluated with a forty foot antenna and the Sigma V computer. Programs have been completed which drive the antenna directly without the need for a servo amplifier, antenna position programmer or a scan generator.

  18. ACCESS Pointing Control System

    NASA Technical Reports Server (NTRS)

    Brugarolas, Paul; Alexander, James; Trauger, John; Moody, Dwight; Egerman, Robert; Vallone, Phillip; Elias, Jason; Hejal, Reem; Camelo, Vanessa; Bronowicki, Allen; O'Connor, David; Partrick, Richard; Orzechowski, Pawel; Spitter, Connie; Lillie, Chuck

    2010-01-01

    ACCESS (Actively-Corrected Coronograph for Exoplanet System Studies) was one of four medium-class exoplanet concepts selected for the NASA Astrophysics Strategic Mission Concept Study (ASMCS) program in 2008/2009. The ACCESS study evaluated four major coronograph concepts under a common space observatory. This paper describes the high precision pointing control system (PCS) baselined for this observatory.

  19. An adaptive learning control system for aircraft

    NASA Technical Reports Server (NTRS)

    Mekel, R.; Nachmias, S.

    1976-01-01

    A learning control system is developed which blends the gain scheduling and adaptive control into a single learning system that has the advantages of both. An important feature of the developed learning control system is its capability to adjust the gain schedule in a prescribed manner to account for changing aircraft operating characteristics. Furthermore, if tests performed by the criteria of the learning system preclude any possible change in the gain schedule, then the overall system becomes an ordinary gain scheduling system. Examples are discussed.

  20. Fuel control system

    SciTech Connect

    Staniak, W.A.; Samuelson, R.E.; Moncelle, M.E.

    1986-10-14

    A fuel control system is described comprising: a fuel rack movable in opposite fuel-increasing and fuel-decreasing directions; a rack control member movable in opposite fuel-increasing and fuel-decreasing directions; servo system means for moving the fuel rack in response to movement of the rack control member an electrically energizable member movable in opposite fuel-increasing and fuel-decreasing directions, the electrically energizable member being urged to move in its fuel-decreasing direction when energized; first coupling means for connecting the electrically energizable member to the rack control member to move the rack control member in its fuel-decreasing direction in response to movement of the electrically energizable member in its fuel-decreasing direction; a mechanical governor control having a member movable in opposite fuel-increasing and fuel-decreasing directions; second coupling means for connecting the mechanical governor to the rack control member to move the rack control member in its fuel-decreasing direction in response to movement of the mechanical governor member in its fuel-decreasing direction; bias means for biasing the rack control member to move in its fuel-increasing direction.

  1. CNEOST Control Software System

    NASA Astrophysics Data System (ADS)

    Wang, X.; Zhao, H. B.; Xia, Y.; Lu, H.; Li, B.

    2015-03-01

    In 2013, CNEOST (China Near Earth Object Survey Telescope) adapted its hardware system for the new CCD camera. Based on the new system architecture, the control software is re-designed and implemented. The software system adopts the message passing mechanism via WebSocket protocol, and improves its flexibility, expansibility, and scalability. The user interface with responsive web design realizes the remote operating under both desktop and mobile devices. The stable operating of software system has greatly enhanced the operation efficiency while reducing the complexity, and has also made a successful attempt for the future system design of telescope and telescope cloud.

  2. CNEOST Control Software System

    NASA Astrophysics Data System (ADS)

    Wang, Xin; Zhao, Hai-bin; Xia, Yan; Lu, Hao; Li, Bin

    2016-01-01

    In 2013, CNEOST (China Near Earth Object Survey Telescope) adapted its hardware system for the new CCD camera. Based on the new system architecture, the control software is re-designed and implemented. The software system adopts the messaging mechanism based on the WebSocket protocol, and possesses good flexibility and expansibility. The user interface based on the responsive web design has realized the remote observations under both desktop and mobile devices. The stable operation of the software system has greatly enhanced the operation efficiency while reducing the complexity, and has also made a successful attempt for the future system design of telescope and telescope cloud.

  3. LCA and emergy accounting of aquaculture systems: towards ecological intensification.

    PubMed

    Wilfart, Aurélie; Prudhomme, Jehane; Blancheton, Jean-Paul; Aubin, Joël

    2013-05-30

    An integrated approach is required to optimise fish farming systems by maximising output while minimising their negative environmental impacts. We developed a holistic approach to assess the environmental performances by combining two methods based on energetic and physical flow analysis. Life Cycle Assessment (LCA) is a normalised method that estimates resource use and potential impacts throughout a product's life cycle. Emergy Accounting (EA) refers the amount of energy directly or indirectly required by a product or a service. The combination of these two methods was used to evaluate the environmental impacts of three contrasting fish-farming systems: a farm producing salmon in a recirculating system (RSF), a semi-extensive polyculture pond (PF1) and an extensive polyculture pond (PF2). The RSF system, with a low feed-conversion ratio (FCR = 0.95), had lower environmental impacts per tonne of live fish produced than did the two pond farms, when the effects on climate change, acidification, total cumulative energy demand, land competition and water dependence were considered. However, RSF was clearly disconnected from the surrounding environment and depended highly on external resources (e.g. nutrients, energy). Ponds adequately incorporated renewable natural resources but had higher environmental impacts due to incomplete use of external inputs. This study highlighted key factors necessary for the successful ecological intensification of fish farming, i.e., minimise external inputs, lower the FCR, and increase the use of renewable resources from the surrounding environment. The combination of LCA and EA seems to be a practical approach to address the complexity of optimising biophysical efficiency in aquaculture systems. PMID:23531606

  4. Asynchronous interactive control systems

    NASA Technical Reports Server (NTRS)

    Vuskovic, M. I.; Heer, E.

    1980-01-01

    A class of interactive control systems is derived by generalizing interactive manipulator control systems. The general structural properties of such systems are discussed and an appropriate general software implementation is proposed. This is based on the fact that tasks of interactive control systems can be represented as a network of a finite set of actions which have specific operational characteristics and specific resource requirements, and which are of limited duration. This has enabled the decomposition of the overall control algorithm into a set of subalgorithms, called subcontrollers, which can operate simultaneously and asynchronously. Coordinate transformations of sensor feedback data and actuator set-points have enabled the further simplification of the subcontrollers and have reduced their conflicting resource requirements. The modules of the decomposed control system are implemented as parallel processes with disjoint memory space communicating only by I/O. The synchronization mechanisms for dynamic resource allocation among subcontrollers and other synchronization mechanisms are also discussed in this paper. Such a software organization is suitable for the general form of multiprocessing using computer networks with distributed storage.

  5. Neural Flight Control System

    NASA Technical Reports Server (NTRS)

    Gundy-Burlet, Karen

    2003-01-01

    The Neural Flight Control System (NFCS) was developed to address the need for control systems that can be produced and tested at lower cost, easily adapted to prototype vehicles and for flight systems that can accommodate damaged control surfaces or changes to aircraft stability and control characteristics resulting from failures or accidents. NFCS utilizes on a neural network-based flight control algorithm which automatically compensates for a broad spectrum of unanticipated damage or failures of an aircraft in flight. Pilot stick and rudder pedal inputs are fed into a reference model which produces pitch, roll and yaw rate commands. The reference model frequencies and gains can be set to provide handling quality characteristics suitable for the aircraft of interest. The rate commands are used in conjunction with estimates of the aircraft s stability and control (S&C) derivatives by a simplified Dynamic Inverse controller to produce virtual elevator, aileron and rudder commands. These virtual surface deflection commands are optimally distributed across the aircraft s available control surfaces using linear programming theory. Sensor data is compared with the reference model rate commands to produce an error signal. A Proportional/Integral (PI) error controller "winds up" on the error signal and adds an augmented command to the reference model output with the effect of zeroing the error signal. In order to provide more consistent handling qualities for the pilot, neural networks learn the behavior of the error controller and add in the augmented command before the integrator winds up. In the case of damage sufficient to affect the handling qualities of the aircraft, an Adaptive Critic is utilized to reduce the reference model frequencies and gains to stay within a flyable envelope of the aircraft.

  6. Community-Based School Finance and Accountability: A New Era for Local Control in Education Policy?

    ERIC Educational Resources Information Center

    Vasquez Heilig, Julian; Ward, Derrick R.; Weisman, Eric; Cole, Heather

    2014-01-01

    Top-down accountability policies have arguably had very limited impact over the past 20 years. Education stakeholders are now contemplating new forms of bottom-up accountability. In 2013, policymakers in California enacted a community-based approach that creates the Local Control Funding Formula (LCFF) process for school finance to increase…

  7. 46 CFR 403.100 - Applicability of system of accounts and reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... accordance with the guidelines of the Generally Accepted Accounting Principles (GAAP) issued by the Financial Accounting Standards Board. These guidelines are available by writing to the Director, Great Lakes Pilotage... PILOTAGE UNIFORM ACCOUNTING SYSTEM General § 403.100 Applicability of system of accounts and reports....

  8. Quality improvement and accountability in the Danish health care system.

    PubMed

    Mainz, Jan; Kristensen, Solvejg; Bartels, Paul

    2015-12-01

    Denmark has unique opportunities for quality measurement and benchmarking since Denmark has well-developed health registries and unique patient identifier that allow all registries to include patient-level data and combine data into sophisticated quality performance monitoring. Over decades, Denmark has developed and implemented national quality and patient safety initiatives in the healthcare system in terms of national clinical guidelines, performance and outcome measurement integrated in clinical databases for important diseases and clinical conditions, measurement of patient experiences, reporting of adverse events, national handling of patient complaints, national accreditation and public disclosure of all data on the quality of care. Over the years, Denmark has worked up a progressive and transparent just culture in quality management; the different actors at the different levels of the healthcare system are mutually attentive and responsive in a coordinated effort for quality of the healthcare services. At national, regional, local and hospital level, it is mandatory to participate in the quality initiatives and to use data and results for quality management, quality improvement, transparency in health care and accountability. To further develop the Danish governance model, it is important to expand the model to the primary care sector. Furthermore, a national quality health programme 2015-18 recently launched by the government supports a new development in health care focusing upon delivering high-quality health care-high quality is defined by results of value to the patients. PMID:26443814

  9. SERVOMOTOR CONTROL SYSTEM

    DOEpatents

    MacNeille, S.M.

    1958-12-01

    Control systems for automatic positioning of an electric motor operated vapor valve are described which is operable under the severe conditions existing in apparatus for electro-magnetlcally separating isotopes. In general, the system includes a rotor for turning the valve comprising two colls mounted mutually perpendicular to each other and also perpendicular to the magnetic field of the isotope separating apparatus. The coils are furnished with both a-c and d- c current by assoclate control circuitry and a position control is provided for varying the ratlo of the a-c currents in the coils and at the same time, but in an inverse manner, the ratio between the d-c currents in the coils is varied. With the present system the magnitude of the motor torque is constant for all valves of the rotor orientatlon angle.

  10. Sensitivity of optimal control systems with bang-bang control.

    NASA Technical Reports Server (NTRS)

    Rootenberg, J.; Courtin, P.

    1973-01-01

    The effects of small parameter variations on the performance index of optimal control systems with initial and final target manifolds, free end time, and bang-bang control are analyzed in this paper. A new approach to the sensitivity equation is presented. This approach takes into account the pulse-shaped variation produced by the parameter change on the bang-bang control. An expression, that relates the variations of the performance index, the trajectory, the final time, and the parameter, is derived. This expression extends to the class of optimal systems with bang-bang control, a result previously obtained by Courtin and Rootenberg (1971).

  11. Attitude control system

    NASA Technical Reports Server (NTRS)

    Vonpragenau, G. L.; Rupp, C. C. (Inventor)

    1976-01-01

    An attitude control system is described in which angular rate signals are generated by rate gyros mounted closely adjacent to gimbaled engines at the rear of a vehicle. Error signals representative of a commanded change in vehicle angle or attitude are obtained from a precision inertial platform located in the nose region of the vehicle. The rate gyro derived signals dominate at high frequencies where dynamic effects become significant, and platform signals dominate at low frequencies where precision signals are required for a steady vehicle attitude. The blended signals are applied in a conventional manner to control the gimbaling of vehicle engines about control axes.

  12. REACTOR CONTROL SYSTEM

    DOEpatents

    MacNeill, J.H.; Estabrook, J.Y.

    1960-05-10

    A reactor control system including a continuous tape passing through a first coolant passageway, over idler rollers, back through another parallel passageway, and over motor-driven rollers is described. Discrete portions of fuel or poison are carried on two opposed active sections of the tape. Driving the tape in forward or reverse directions causes both active sections to be simultaneously inserted or withdrawn uniformly, tending to maintain a more uniform flux within the reactor. The system is particularly useful in mobile reactors, where reduced inertial resistance to control rod movement is important.

  13. Self-Monitoring Assessments for Educational Accountability Systems

    ERIC Educational Resources Information Center

    Koretz, Daniel; Beguin, Anton

    2010-01-01

    Test-based accountability is now the cornerstone of U.S. education policy, and it is becoming more important in many other nations as well. Educators sometimes respond to test-based accountability in ways that produce score inflation. In the past, score inflation has usually been evaluated by comparing trends in scores on a high-stakes test to…

  14. Financial Accounting for Local and State School Systems, 1990.

    ERIC Educational Resources Information Center

    Fowler, William J., Jr.

    The purpose of this guidebook is to reflect the changes that have occurred since 1973 in governmental accounting and education finance. This document serves as a vehicle for program cost accounting at the local and intermediate levels. Although not required by federal law, the National Center for Education Statistics (NCES) encourages state and…

  15. Systems accounting for energy consumption and carbon emission by building

    NASA Astrophysics Data System (ADS)

    Shao, Ling; Chen, G. Q.; Chen, Z. M.; Guo, Shan; Han, M. Y.; Zhang, Bo; Hayat, T.; Alsaedi, A.; Ahmad, B.

    2014-06-01

    The method of systems accounting for overall energy consumption and carbon emission induced by a building is illustrated in terms of a combination of process and input-output analyses with a concrete procedure to cover various material, equipment, energy and manpower inputs. A detailed case study based on raw project data in the Bill of Quantities (BOQ) is performed for the structure engineering of the landmark buildings in E-town, Beijing (Beijing Economic-Technological Development Area). Based on the embodied energy and carbon emission intensity database for the Chinese economy in 2007, the energy consumption and the carbon emission of the structure engineering of the case buildings are quantified as 4.15E+14 J and 4.83E+04 t CO2 Eq., corresponding to intensities of 6.91E+09 J/m2 and 0.81 t CO2 Eq./m2 floor area. Steel and concrete contribute respectively about 50% and 30% of the energy consumption and the carbon emission, as a result of the reinforced-concrete structure of the case buildings. Materials contribute up to about 90% of the total energy consumption and carbon emission, in contrast to manpower, energy and equipment around 8%, 1% and 0.1%, respectively.

  16. Intelligence control systems

    NASA Technical Reports Server (NTRS)

    Saridis, G. N.

    1980-01-01

    The evolution of ideas of intelligent controls and their application to high level man machine interactive systems like general purpose manipulators, industrial robots, prosthetic devices for amputees, and orthotic devices for paralyzed persons are discussed. Some case studies are presented to demonstrate the feasibility of the approach.

  17. Electric turbocompound control system

    DOEpatents

    Algrain, Marcelo C.

    2007-02-13

    Turbocompound systems can be used to affect engine operation using the energy in exhaust gas that is driving the available turbocharger. A first electrical device acts as a generator in response to turbocharger rotation. A second electrical device acts as a motor to put mechanical power into the engine, typically at the crankshaft. Apparatus, systems, steps, and methods are described to control the generator and motor operations to control the amount of power being recovered. This can control engine operation closer to desirable parameters for given engine-related operating conditions compared to actual. The electrical devices can also operate in "reverse," going between motor and generator functions. This permits the electrical device associated with the crankshaft to drive the electrical device associated with the turbocharger as a motor, overcoming deficient engine operating conditions such as associated with turbocharger lag.

  18. Timing control system

    NASA Technical Reports Server (NTRS)

    Wiker, Gordon A. (Inventor); Wells, Jr., George H. (Inventor)

    1989-01-01

    A timing control system is disclosed which is particularly useful in connection with simulated mortar shells. Special circuitry is provided to assure that the shell does not overshoot, but rather detonates early in case of an improper condition; this ensures that ground personnel will not be harmed by a delayed detonation. The system responds to an externally applied frequency control code which is configured to avoid any confusion between different control modes. A premature detonation routine is entered in case an improper time-setting signal is entered, or if the shell is launched before completion of the time-setting sequence. Special provisions are also made for very early launch situations and improper detonator connections. An alternate abort mode is provided to discharge the internal power supply without a detonation in a manner that can be externally monitored, thereby providing a mechanism for non-destructive testing. The abort mode also accelerates the timing function for rapid testing.

  19. An enhanced nonlinear damping approach accounting for system constraints in active mass dampers

    NASA Astrophysics Data System (ADS)

    Venanzi, Ilaria; Ierimonti, Laura; Ubertini, Filippo

    2015-11-01

    Active mass dampers are a viable solution for mitigating wind-induced vibrations in high-rise buildings and improve occupants' comfort. Such devices suffer particularly when they reach force saturation of the actuators and maximum extension of their stroke, which may occur in case of severe loading conditions (e.g. wind gust and earthquake). Exceeding actuators' physical limits can impair the control performance of the system or even lead to devices damage, with consequent need for repair or substitution of part of the control system. Controllers for active mass dampers should account for their technological limits. Prior work of the authors was devoted to stroke issues and led to the definition of a nonlinear damping approach, very easy to implement in practice. It consisted of a modified skyhook algorithm complemented with a nonlinear braking force to reverse the direction of the mass before reaching the stroke limit. This paper presents an enhanced version of this approach, also accounting for force saturation of the actuator and keeping the simplicity of implementation. This is achieved by modulating the control force by a nonlinear smooth function depending on the ratio between actuator's force and saturation limit. Results of a numerical investigation show that the proposed approach provides similar results to the method of the State Dependent Riccati Equation, a well-established technique for designing optimal controllers for constrained systems, yet very difficult to apply in practice.

  20. Controllability of Complex Systems

    NASA Astrophysics Data System (ADS)

    Slotine, Jean-Jacques

    2013-03-01

    We review recent work on controllability of complex systems. We also discuss the interplay of our results with questions of synchronization, and point out key directions of future research. Work done in collaboration with Yang-Yu Liu, Center for Complex Network Research and Departments of Physics, Computer Science and Biology, Northeastern University and Center for Cancer Systems Biology, Dana-Farber Cancer Institute; and Albert-László Barabási, Center for Complex Network Research and Departments of Physics, Computer Science and Biology, Northeastern University; Center for Cancer Systems Biology, Dana-Farber Cancer Institute; and Department of Medicine, Brigham and Women's Hospital, Harvard Medical School.

  1. Telerobot control system

    NASA Technical Reports Server (NTRS)

    Backes, Paul G. (Inventor); Tso, Kam S. (Inventor)

    1993-01-01

    This invention relates to an operator interface for controlling a telerobot to perform tasks in a poorly modeled environment and/or within unplanned scenarios. The telerobot control system includes a remote robot manipulator linked to an operator interface. The operator interface includes a setup terminal, simulation terminal, and execution terminal for the control of the graphics simulator and local robot actuator as well as the remote robot actuator. These terminals may be combined in a single terminal. Complex tasks are developed from sequential combinations of parameterized task primitives and recorded teleoperations, and are tested by execution on a graphics simulator and/or local robot actuator, together with adjustable time delays. The novel features of this invention include the shared and supervisory control of the remote robot manipulator via operator interface by pretested complex tasks sequences based on sequences of parameterized task primitives combined with further teleoperation and run-time binding of parameters based on task context.

  2. 48 CFR 252.242-7004 - Material Management and Accounting System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CLAUSES Text of Provisions And Clauses 252.242-7004 Material Management and Accounting System. As prescribed in 242.7204, use the following clause: Material Management and Accounting System (MAY 2011) (a) Definitions. As used in this clause— (1) Material management and accounting system (MMAS) means the...

  3. 48 CFR 252.242-7004 - Material Management and Accounting System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CLAUSES Text of Provisions And Clauses 252.242-7004 Material Management and Accounting System. As prescribed in 242.7204, use the following clause: MATERIAL MANAGEMENT AND ACCOUNTING SYSTEM (MAY 2011) (a) Definitions. As used in this clause— (1) Material management and accounting system (MMAS) means the...

  4. 48 CFR 252.242-7004 - Material management and accounting system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CLAUSES Text of Provisions And Clauses 252.242-7004 Material management and accounting system. As prescribed in 242.7204, use the following caluse: Material Management and Accounting System (JUL 2009) (a) Definitions. As used in this clause— (1) Material management and accounting system (MMAS) means the...

  5. 48 CFR 252.242-7004 - Material Management and Accounting System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CLAUSES Text of Provisions And Clauses 252.242-7004 Material Management and Accounting System. As prescribed in 242.7204, use the following clause: Material Management and Accounting System (MAY 2011) (a) Definitions. As used in this clause— (1) Material management and accounting system (MMAS) means the...

  6. 48 CFR 252.242-7004 - Material Management and Accounting System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CLAUSES Text of Provisions And Clauses 252.242-7004 Material Management and Accounting System. As prescribed in 242.7204, use the following clause: Material Management and Accounting System (MAY 2011) (a) Definitions. As used in this clause— (1) Material management and accounting system (MMAS) means the...

  7. MATS--Management Accounting Tutorial System. Version 1.0. User Guide.

    ERIC Educational Resources Information Center

    Wardle, Andrew; O'Connor, Rodric

    The Management Accounting Tutorial System (MATS) is a management accounting database for a carpet manufacturing company. The system allows the display and output of monthly activities, and is intended to provide a means of illustrating the main topics of the second year management accounting course at Manchester University. The system itself…

  8. 49 CFR 1242.79 - Communication systems operations (account XX-55-77).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Communication systems operations (account XX-55-77...-Transportation § 1242.79 Communication systems operations (account XX-55-77). Separate common expenses on bases of the percentages calculated for the separation of Communication Systems (account XX-19-20), §...

  9. Management control system description

    SciTech Connect

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  10. US/Russian program in materials protection, control and accounting at the RRC Kurchatov Institute: 1997--1998

    SciTech Connect

    Sukhoruchkin, V.; Rumyantsev, A.; Shmelev, V.

    1998-12-31

    Six US Department of Energy Laboratories are carrying out a program of cooperation with the Russian Research Center Kurchatov Institute to improve nuclear material protection, control and accounting (MPC and A) at Kurchatov. In 1997--1998 the primary thrust of this program has been directed to Building 106, which houses a number of test reactors and critical facilities. Substantial improvements in physical protection, upgrades in the physical inventory taking procedures, installation of equipment for the computerized materials accounting system, and installation of nuclear material portal monitors and neutron-based measurement equipment are being carried out at this facility. Software for the computerized accounting system, named KI-MACS, has been developed at Kurchatov and the system has been fully integrated with the bar code printing and reading equipment, electronic scales, and nondestructive assay equipment provided under this program. Additional 1997--1998 activities at Kurchatov include continuation of a tamper indicating device program, vulnerability assessments of several facilities, hosting of a Russian-American Workshop on Fissile Material Control and Accountability at Critical Facilities, and the development of accounting procedures for transfers of nuclear materials between material balance areas.

  11. 75 FR 13329 - Implications of Financial Accounting System (FAS) 166 on SBA Guaranteed Loan Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... ADMINISTRATION Implications of Financial Accounting System (FAS) 166 on SBA Guaranteed Loan Programs AGENCY... Administration (SBA) is soliciting information and views from the public on: (1) The effect that the accounting changes mandated by the Financial Accounting Standards Board (FASB) in Financial Accounting Standard...

  12. 17 CFR 256.01-3 - General structure of accounting system.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... account numbers in the Uniform System of Accounts for Public Utilities and Licensees (18 CFR Part 101) of... COMPANIES, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 General Instructions § 256.01-3 General structure of... company property. (b) The income and expense accounts include, under separate divisions, accounts...

  13. 17 CFR 256.01-3 - General structure of accounting system.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... account numbers in the Uniform System of Accounts for Public Utilities and Licensees (18 CFR Part 101) of... COMPANIES, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 General Instructions § 256.01-3 General structure of... company property. (b) The income and expense accounts include, under separate divisions, accounts...

  14. An SSH key management system: easing the pain of managing key/user/account associations

    NASA Astrophysics Data System (ADS)

    Arkhipkin, D.; Betts, W.; Lauret, J.; Shiryaev, A.

    2008-07-01

    Cyber security requirements for secure access to computing facilities often call for access controls via gatekeepers and the use of two-factor authentication. Using SSH keys to satisfy the two factor authentication requirement has introduced a potentially challenging task of managing the keys and their associations with individual users and user accounts. Approaches for a facility with the simple model of one remote user corresponding to one local user would not work at facilities that require a many-to-many mapping between users and accounts on multiple systems. We will present an SSH key management system we developed, tested and deployed to address the many-to-many dilemma in the environment of the STAR experiment. We will explain its use in an online computing context and explain how it makes possible the management and tracing of group account access spread over many sub-system components (data acquisition, slow controls, trigger, detector instrumentation, etc.) without the use of shared passwords for remote logins.

  15. 10 CFR 60.78 - Material control and accounting records and reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Material control and accounting records and reports. 60.78 Section 60.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Records, Reports, Tests, and Inspections § 60.78 Material control...

  16. 10 CFR 60.78 - Material control and accounting records and reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Material control and accounting records and reports. 60.78 Section 60.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Records, Reports, Tests, and Inspections § 60.78 Material control...

  17. 10 CFR 60.78 - Material control and accounting records and reports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Material control and accounting records and reports. 60.78 Section 60.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Records, Reports, Tests, and Inspections § 60.78 Material control...

  18. 10 CFR 60.78 - Material control and accounting records and reports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Material control and accounting records and reports. 60.78 Section 60.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Records, Reports, Tests, and Inspections § 60.78 Material control...

  19. 10 CFR 60.78 - Material control and accounting records and reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Material control and accounting records and reports. 60.78 Section 60.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Records, Reports, Tests, and Inspections § 60.78 Material control...

  20. Cooperative efforts of the materials protection control and accounting program at the electrochemical plant (Krasnoyarsk-45) in Russia-011

    SciTech Connect

    Moore, L.

    1998-07-22

    The USDOE Material Protection Control and Accountability Program (MPC&A) has established a Project Team with the goal of providing the Russian Electrochemical Plant (ECP) with equipment and training to enable ECP to evaluate, develop, and implement a comprehensive plan and systems for physical protection, material controls, and accountancy upgrades. The MPC&A project will provide for improvements such as risk assessments, access control upgrades, computerized MC&A, communications systems upgrades, building perimeter surveillance and intrusion detection upgrades, vault upgrades, metal and nuclear material detection upgrades, along with mass measurement and non- destructive analysis (NDA) instrumentation. This paper outlines the overall objectives of the MPC&A project at the Electrochemical Plant.

  1. Vehicle speed control system

    SciTech Connect

    Yoshida, D.; Tanno, T.; Fukunaga, T.

    1987-06-16

    This patent describes a vehicle speed control system for performing vehicle speed control by controlling the displacement of at least one of a hydraulic pump and a hydraulic motor of a hydraulic transmission through an electric servo device, comprising: vehicle speed setting means for generating a voltage signal corresponding to a vehicle speed to be set; compensating means interposed between the vehicle speed setting means and the electric servo device, the compensating means comprising a first delay element; and second delay element having a response characteristic slower than that of the first delay element. A selecting means for judging as to whether a voltage signal changed by the operation of the vehicle speed setting means represents an acceleration command or a deceleration command and for selecting the first delay element when the voltage signal represents an acceleration command and for selecting the second delay element when the voltage signal represents a deceleration command.

  2. Computer-based accountability system (Phase I) for special nuclear materials at Argonne-West

    SciTech Connect

    Ingermanson, R.S.; Proctor, A.E.

    1982-05-01

    An automated accountability system for special nuclear materials (SNM) is under development at Argonne National Laboratory-West. Phase I of the development effort has established the following basic features of the system: a unique file organization allows rapid updating or retrieval of the status of various SNM, based on batch numbers, storage location, serial number, or other attributes. Access to the program is controlled by an interactive user interface that can be easily understood by operators who have had no prior background in electronic data processing. Extensive use of structured programming techniques make the software package easy to understand and to modify for specific applications. All routines are written in FORTRAN.

  3. Incoherent control of locally controllable quantum systems

    SciTech Connect

    Dong Daoyi; Zhang Chenbin; Rabitz, Herschel; Pechen, Alexander; Tarn, T.-J.

    2008-10-21

    An incoherent control scheme for state control of locally controllable quantum systems is proposed. This scheme includes three steps: (1) amplitude amplification of the initial state by a suitable unitary transformation, (2) projective measurement of the amplified state, and (3) final optimization by a unitary controlled transformation. The first step increases the amplitudes of some desired eigenstates and the corresponding probability of observing these eigenstates, the second step projects, with high probability, the amplified state into a desired eigenstate, and the last step steers this eigenstate into the target state. Within this scheme, two control algorithms are presented for two classes of quantum systems. As an example, the incoherent control scheme is applied to the control of a hydrogen atom by an external field. The results support the suggestion that projective measurements can serve as an effective control and local controllability information can be used to design control laws for quantum systems. Thus, this scheme establishes a subtle connection between control design and controllability analysis of quantum systems and provides an effective engineering approach in controlling quantum systems with partial controllability information.

  4. OAJ control system

    NASA Astrophysics Data System (ADS)

    Antón, J. L.; Yanes-Díaz, A.; Rueda-Teruel, S.; Luis-Simoes, R.; Chueca, S.; Lasso-Cabrera, N. M.; Bello, R.; Jiménez, D.; Suárez, O.; Guillén, L.; López-Alegre, G.; Rodríguez, M. A.; de Castro, S.; Nevot, C.; Sánchez-Artigot, J.; Moles, M.; Cenarro, A. J.; Marín-Franch, A.; Ederoclite, A.; Varela, J.; Valdivielso, L.; Cristóbal-Hornillos, D.; López-Sainz, A.; Hernández-Fuertes, J.; Díaz-Martín, M. C.; Iglesias-Marzoa, R.; Abril, J.; Lamadrid, J. L.; Maicas, N.; Rodríguez, S.; Tilve, V.; Civera, T.; Muniesa, D. J.

    2015-05-01

    The Observatorio Astrofísico de Javalambre (OAJ) is a new astronomical facility located at the Sierra de Javalambre (Teruel, Spain) whose primary role will be to conduct all-sky astronomical surveys leveraging two unprecedented telescopes with unusually large fields of view: the JST/T250, a 2.55 m telescope with a 3 deg field of view, and the JAST/T80, an 83 cm telescope with a 2 deg field of view. The immediate objective of these telescopes for the next years is carrying out two unique photometric surveys covering several thousands square degrees: J-PAS and J-PLUS, each of them with a wide range of scientific applications, like e.g. large structure cosmology and Dark Energy, galaxy evolution, supernovae, Milky Way structure and exoplanets. JST and JAST will be equipped with panoramic cameras being developed within the J-PAS collaboration, JPCam and T80Cam respectively, which make use of large format (˜10{k}×10{k}) CCDs covering the entire focal plane. CEFCA engineering team has been designing the OAJ control system as a global concept to manage, monitor, control and service the observatory systems, not only astronomical but also infrastructure and other facilities. We will give an overview of OAJ's control system from an engineering point of view.

  5. Telerobotic virtual control system

    NASA Astrophysics Data System (ADS)

    Zhai, Shumin; Milgram, Paul

    1992-03-01

    A project to develop a telerobotic `virtual control' capability, currently underway at the University of Toronto, is described. The project centers on a new mode of interactive telerobotic control based on the technology of combining computer generated stereographic images with remotely transmitted stereoscopic video images. A virtual measurement technique, in conjunction with a basic level of digital image processing, comprising zooming, parallax adjustment, edge enhancement, and edge detection has been developed to assist the human operator in visualization of the remote environment and in spatial reasoning. The aim is to maintain target recognition, tactical planning, and high-level control functions in the hands of the human operator with the computer performing low-level computation and control. Control commands initiated by the operator are implemented through manipulation of a virtual image of the robot system, merged with a live video image of the remote scene. This paper discusses the philosophy and objectives of the project, with emphasis on the underlying human factor considerations in the design, and reports the progress made to date in this effort.

  6. Opportunities and challenges for implementing cost accounting systems in the Kenyan health system

    PubMed Central

    Kihuba, Elesban; Gheorghe, Adrian; Bozzani, Fiammetta; English, Mike; Griffiths, Ulla K.

    2016-01-01

    Background Low- and middle-income countries need to sustain efficiency and equity in health financing on their way to universal health care coverage. However, systems meant to generate quality economic information are often deficient in such settings. We assessed the feasibility of streamlining cost accounting systems within the Kenyan health sector to illustrate the pragmatic challenges and opportunities. Design We reviewed policy documents, and conducted field observations and semi-structured interviews with key informants in the health sector. We used an adapted Human, Organization and Technology fit (HOT-fit) framework to analyze the components and standards of a cost accounting system. Results Among the opportunities for a viable cost accounting system, we identified a supportive broad policy environment, political will, presence of a national data reporting architecture, good implementation experience with electronic medical records systems, and the availability of patient clinical and resource use data. However, several practical issues need to be considered in the design of the system, including the lack of a framework to guide the costing process, the lack of long-term investment, the lack of appropriate incentives for ground-level staff, and a risk of overburdening the current health management information system. Conclusion To facilitate the implementation of cost accounting into the health sector, the design of any proposed system needs to remain simple and attuned to the local context. PMID:27357072

  7. Gas turbine engine control system

    NASA Technical Reports Server (NTRS)

    Idelchik, Michael S. (Inventor)

    1991-01-01

    A control system and method of controlling a gas turbine engine. The control system receives an error signal and processes the error signal to form a primary fuel control signal. The control system also receives at least one anticipatory demand signal and processes the signal to form an anticipatory fuel control signal. The control system adjusts the value of the anticipatory fuel control signal based on the value of the error signal to form an adjusted anticipatory signal and then the adjusted anticipatory fuel control signal and the primary fuel control signal are combined to form a fuel command signal.

  8. Common Accounting System for Monitoring the ATLAS Distributed Computing Resources

    NASA Astrophysics Data System (ADS)

    Karavakis, E.; Andreeva, J.; Campana, S.; Gayazov, S.; Jezequel, S.; Saiz, P.; Sargsyan, L.; Schovancova, J.; Ueda, I.; Atlas Collaboration

    2014-06-01

    This paper covers in detail a variety of accounting tools used to monitor the utilisation of the available computational and storage resources within the ATLAS Distributed Computing during the first three years of Large Hadron Collider data taking. The Experiment Dashboard provides a set of common accounting tools that combine monitoring information originating from many different information sources; either generic or ATLAS specific. This set of tools provides quality and scalable solutions that are flexible enough to support the constantly evolving requirements of the ATLAS user community.

  9. A Model for Systemic Control

    NASA Astrophysics Data System (ADS)

    Schwaninger, Markus; Ambroz, Kristjan; Olaya, Camilo

    2006-06-01

    Where should one begin with a design for the self-control of social systems? That is the question addressed by this paper. The traditional concepts of control rest on the feedback loop; control is essential to the attainment of goals. However, the simple feedback loop is insufficient for the modeling of a control system for an organization or other social system. For those systems, which search for multiple goals, it is necessary to design multilevel control systems incorporating the notion of pre-control. This eminently anticipatory function has hardly been considered by past research. Pre-control as understood here is a higher-order control that takes place between different logical levels of a control system. The Model of Systemic Control (MSC), a framework for multilevel control with pre-control relationships, is expounded and illustrated by means of a System Dynamics model.

  10. 49 CFR 1242.19 - Electric power systems (account XX-19-21).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 9 2012-10-01 2012-10-01 false Electric power systems (account XX-19-21). 1242.19... Structures § 1242.19 Electric power systems (account XX-19-21). Separate common expenses on basis of common expenses of electric power purchased or produced for motive power (accounts XX-51-68 and XX-52-68)....

  11. 49 CFR 1242.19 - Electric power systems (account XX-19-21).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Electric power systems (account XX-19-21). 1242.19... Structures § 1242.19 Electric power systems (account XX-19-21). Separate common expenses on basis of common expenses of electric power purchased or produced for motive power (accounts XX-51-68 and XX-52-68)....

  12. 49 CFR 1242.19 - Electric power systems (account XX-19-21).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 9 2014-10-01 2014-10-01 false Electric power systems (account XX-19-21). 1242.19... Structures § 1242.19 Electric power systems (account XX-19-21). Separate common expenses on basis of common expenses of electric power purchased or produced for motive power (accounts XX-51-68 and XX-52-68)....

  13. 49 CFR 1242.19 - Electric power systems (account XX-19-21).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 9 2013-10-01 2013-10-01 false Electric power systems (account XX-19-21). 1242.19... Structures § 1242.19 Electric power systems (account XX-19-21). Separate common expenses on basis of common expenses of electric power purchased or produced for motive power (accounts XX-51-68 and XX-52-68)....

  14. 49 CFR 1242.19 - Electric power systems (account XX-19-21).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Electric power systems (account XX-19-21). 1242.19... Structures § 1242.19 Electric power systems (account XX-19-21). Separate common expenses on basis of common expenses of electric power purchased or produced for motive power (accounts XX-51-68 and XX-52-68)....

  15. 14 CFR Sec. 1-1 - Applicability of system of accounts and reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Applicability of system of accounts and reports. Sec. 1-1 Section 1-1 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION... AIR CARRIERS General Accounting Provisions Sec. 1-1 Applicability of system of accounts and...

  16. 14 CFR 1-1 - Applicability of system of accounts and reports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Applicability of system of accounts and reports. Sec. 1-1 Section Sec. 1-1 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF... CERTIFICATED AIR CARRIERS General Accounting Provisions Sec. 1-1 Applicability of system of accounts...

  17. 14 CFR Sec. 1-1 - Applicability of system of accounts and reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Applicability of system of accounts and reports. Sec. 1-1 Section 1-1 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION... AIR CARRIERS General Accounting Provisions Sec. 1-1 Applicability of system of accounts and...

  18. 14 CFR Sec. 1-1 - Applicability of system of accounts and reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Applicability of system of accounts and reports. Sec. 1-1 Section 1-1 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION... AIR CARRIERS General Accounting Provisions Sec. 1-1 Applicability of system of accounts and...

  19. 14 CFR Sec. 1-1 - Applicability of system of accounts and reports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Applicability of system of accounts and reports. Sec. 1-1 Section 1-1 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION... AIR CARRIERS General Accounting Provisions Sec. 1-1 Applicability of system of accounts and...

  20. 49 CFR 1242.18 - Communication systems (account XX-19-20).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Communication systems (account XX-19-20). 1242.18... Structures § 1242.18 Communication systems (account XX-19-20). Separate common expenses on the basis of the... (accounts XX-19-02 to XX-19-04, inclusive) Equipment—Administration—Locomotives and Other...

  1. 14 CFR Sec. 1-2 - Waivers from this system of accounts and reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Waivers from this system of accounts and reports. Sec. 1-2 Section 1-2 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION... AIR CARRIERS General Accounting Provisions Sec. 1-2 Waivers from this system of accounts and...

  2. MIRADAS control system

    NASA Astrophysics Data System (ADS)

    Rosich Minguell, Josefina; Garzón Lopez, Francisco

    2012-09-01

    The Mid-resolution InfRAreD Astronomical Spectrograph (MIRADAS, a near-infrared multi-object echelle spectrograph operating at spectral resolution R=20,000 over the 1-2.5μm bandpass) was selected in 2010 by the Gran Telescopio Canarias (GTC) partnership as the next-generation near-infrared spectrograph for the world's largest optical/infrared telescope, and is being developed by an international consortium. The MIRADAS consortium includes the University of Florida, Universidad de Barcelona, Universidad Complutense de Madrid, Instituto de Astrofísica de Canarias, Institut de Física d'Altes Energies, Institut d'Estudis Espacials de Catalunya and Universidad Nacional Autónoma de México. This paper shows an overview of the MIRADAS control software, which follows the standards defined by the telescope to permit the integration of this software on the GTC Control System (GCS). The MIRADAS Control System is based on a distributed architecture according to a component model where every subsystem is selfcontained. The GCS is a distributed environment written in object oriented C++, which runs components in different computers, using CORBA middleware for communications. Each MIRADAS observing mode, including engineering, monitoring and calibration modes, will have its own predefined sequence, which are executed in the GCS Sequencer. These sequences will have the ability of communicating with other telescope subsystems.

  3. Crawling the Control System

    SciTech Connect

    Theodore Larrieu

    2009-10-01

    Information about accelerator operations and the control system resides in various formats in a variety of places on the lab network. There are operating procedures, technical notes, engineering drawings, and other formal controlled documents. There are programmer references and API documentation generated by tools such as doxygen and javadoc. There are the thousands of electronic records generated by and stored in databases and applications such as electronic logbooks, training materials, wikis, and bulletin boards and the contents of text-based configuration files and log files that can also be valuable sources of information. The obvious way to aggregate all these sources is to index them with a search engine that users can then query from a web browser. Toward this end, the Google "mini" search appliance was selected and implemented because of its low cost and its simple web-based configuration and management. In addition to crawling and indexing electronic documents, the appliance provides an API that has been used to supplement search results with live control system data such as current values of EPICS process variables and graphs of recent data from the archiver.

  4. False Fronts? Behind Higher Education's Voluntary Accountability Systems

    ERIC Educational Resources Information Center

    Kelly, Andrew P.; Aldeman, Chad

    2010-01-01

    The major higher education trade associations have addressed the calls for transparency and accountability by creating two public online databases into which colleges are able to voluntarily submit information on costs and outcomes. The National Association of Independent Colleges and Universities (NAICU) launched its University and College…

  5. The changing role of Material Control and Accountability at Savannah River Site

    SciTech Connect

    Rodriguez, M.P.

    1994-07-01

    As Westinghouse Savannah River Company has been faced with the challenge of better meeting DOE needs with reduced budgets and manpower, the Materials Control and Accountability (MC&A) organization has taken a hard look at its roles and responsibilities. A MC&A program is composed of many functions that can not only meet safeguards needs, but can be used by several organizations across the site to meet their needs as well. These functions include nuclear material measurements, tracking, accounting, and inventory control. The infrastructure in place to provide these functions for accountable nuclear materials requires only a few adjustments to expand to other areas of nuclear materials accounting and control. By integrating several organizations` requirements, the MC&A section can allow line organizations to reduce their costs and rely on the section to better service their needs. On the reverse side, MC&A has completed several cost reduction measures that will allow it to expand its role with no increased costs. The roles and responsibilities of the nuclear material control and accountability program should be expanded. The program`s existing information infrastructure, and knowledge and experience in nuclear material measurements and safeguards can be built upon to meet the needs of new areas such as waste management and decommissioning and decontamination while continuing to support the existing processing. and storage efforts of current facilities.

  6. CONTROL ROOM WITH SPRINKLER SYSTEM CONTROLS, INCLUDING MANUAL CONTROL BOXES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONTROL ROOM WITH SPRINKLER SYSTEM CONTROLS, INCLUDING MANUAL CONTROL BOXES FOR THE VENTILATION SYSTEM AND A PLC SWITCH FOR AUTOMATIC CO (CARBON MONOXIDE) SYSTEM. THE AIR TESTING SYSTEM IS FREE STANDING AND THE FANS ARE COMPUTER-OPERATED. - Alaskan Way Viaduct and Battery Street Tunnel, Seattle, King County, WA

  7. A new computational account of cognitive control over reinforcement-based decision-making: Modeling of a probabilistic learning task.

    PubMed

    Zendehrouh, Sareh

    2015-11-01

    Recent work on decision-making field offers an account of dual-system theory for decision-making process. This theory holds that this process is conducted by two main controllers: a goal-directed system and a habitual system. In the reinforcement learning (RL) domain, the habitual behaviors are connected with model-free methods, in which appropriate actions are learned through trial-and-error experiences. However, goal-directed behaviors are associated with model-based methods of RL, in which actions are selected using a model of the environment. Studies on cognitive control also suggest that during processes like decision-making, some cortical and subcortical structures work in concert to monitor the consequences of decisions and to adjust control according to current task demands. Here a computational model is presented based on dual system theory and cognitive control perspective of decision-making. The proposed model is used to simulate human performance on a variant of probabilistic learning task. The basic proposal is that the brain implements a dual controller, while an accompanying monitoring system detects some kinds of conflict including a hypothetical cost-conflict one. The simulation results address existing theories about two event-related potentials, namely error related negativity (ERN) and feedback related negativity (FRN), and explore the best account of them. Based on the results, some testable predictions are also presented. PMID:26339919

  8. Smog control system

    SciTech Connect

    Eichhorn, C.D.

    1992-01-01

    A smog control system is designed comprised of fans or blowers which are located to introduce air into a smog particle destruction chamber operated with laser energy. The smog particles are broken down and the air is passed into a filtering chamber which may adopt the form of a liquid charcoal chamber. The air may be bubbled through the liquid charcoal and the effluent may then be passed into a freshening agent chamber. The air may then pass as an effluent from the freshening agent chamber. A liquid charcoal supply may be connected to the liquid charcoal chamber and the recovered liquid charcoal which has been spent may be reused for other purposes.

  9. BLTC control system software

    SciTech Connect

    Logan, J.B., Fluor Daniel Hanford

    1997-02-10

    This is a direct revision to Rev. 0 of the BLTC Control System Software. The entire document is being revised and released as HNF-SD-FF-CSWD-025, Rev 1. The changes incorporated by this revision include addition of a feature to automate the sodium drain when removing assemblies from sodium wetted facilities. Other changes eliminate locked in alarms during cold operation and improve the function of the Oxygen Analyzer. See FCN-620498 for further details regarding these changes. Note the change in the document number prefix, in accordance with HNF-MD-003.

  10. Airflow control system

    DOEpatents

    Motszko, Sean Ronald; McEnaney, Ryan Patrick; Brush, Jeffrey Alan; Zimmermann, Daniel E.

    2007-03-13

    A dual airflow control system for an environment having a first air zone and a second air zone. The system includes a first input device operable to generate a first input signal indicative of a desired airflow to the first zone and a second input device operable to generate a second input signal indicative of a desired airflow to the second zone. First and second flow regulators are configured to regulate airflow to the first and second zones, respectively, such that the first and second regulators selectively provide the airflow to each of the first and second zones based on the first and second input signals. A single actuator is associated with the first and second flow regulators. The actuator is operable to simultaneously actuate the first and second flow regulators based on an input from the first and second input devices to allow the desired airflows to the first and the second zones.

  11. Examples of MC and A systems to meet prompt accountability specifications

    SciTech Connect

    Eggers, R F; Brouns, R J; Bryant, J L; Davenport, L C; Brite, D W; Kinnison, R R; Fager, J E; Williams, R C; Wilson, R L

    1983-01-01

    Proposed regulations for NRC licensees authorized to possess and process formula quantities of strategic special nuclear material (SSNM) would require each licensee to implement a material control and accounting (MC and A) system capable of prompt loss detection and alarm resolution. In support of the loss detection and alarm response activities an overcheck program would also be implemented. This program would include personnel qualification and training, quality control, inventory verification and shipper-receiver transaction verification. However, the frequeny of physical inventory verification would be about once per year rather than once every two months. In addition MC and A activities would include procedures for the prevention and detection of data falsification and other forms of deceit that might undermine the performance of the loss detection and response systems. This report provides examples of prompt accountability systems for four plants: mixed oxide fuel fabrication, uranium hexafluoride conversion, high enriched uranium fuel fabrication, and high enriched uranium scrap recovery. Purpose of this report is to provide guidance to the MC and A system designer and evaluator on how the proposed requirements might be met.

  12. 40 CFR 97.52 - NOX Allowance Tracking System responsibilities of NOX authorized account representative.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false NOX Allowance Tracking System... NOX AND SO2 TRADING PROGRAMS NOX Allowance Tracking System § 97.52 NOX Allowance Tracking System... Tracking System account, all submissions to the Administrator pertaining to the account, including, but...

  13. 40 CFR 97.52 - NOX Allowance Tracking System responsibilities of NOX authorized account representative.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false NOX Allowance Tracking System... NOX AND SO2 TRADING PROGRAMS NOX Allowance Tracking System § 97.52 NOX Allowance Tracking System... Tracking System account, all submissions to the Administrator pertaining to the account, including, but...

  14. 40 CFR 97.52 - NOX Allowance Tracking System responsibilities of NOX authorized account representative.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false NOX Allowance Tracking System... NOX AND SO2 TRADING PROGRAMS NOX Allowance Tracking System § 97.52 NOX Allowance Tracking System... Tracking System account, all submissions to the Administrator pertaining to the account, including, but...

  15. On vibration control of tethered satellite systems

    NASA Technical Reports Server (NTRS)

    Xu, D. M.; Misra, A. K.; Modi, V. J.

    1983-01-01

    The general dynamics of a shuttle supported tethered subsatellite system taking into account the longitudinal and three dimensional transverse vibrations is considered. It is noted that control of inherently unstable dynamics during retrieval of the subsatellite can be carried out by letting the rate of change length depend on the state variables in an appropriate manner. Control laws using linear feedback of inplane state variables and nonlinear feedback of out-of-plane state variables are proposed.

  16. Autonomous intelligent cruise control system

    NASA Astrophysics Data System (ADS)

    Baret, Marc; Bomer, Thierry T.; Calesse, C.; Dudych, L.; L'Hoist, P.

    1995-01-01

    Autonomous intelligent cruise control (AICC) systems are not only controlling vehicles' speed but acting on the throttle and eventually on the brakes they could automatically maintain the relative speed and distance between two vehicles in the same lane. And more than just for comfort it appears that these new systems should improve the safety on highways. By applying a technique issued from the space research carried out by MATRA, a sensor based on a charge coupled device (CCD) was designed to acquire the reflected light on standard-mounted car reflectors of pulsed laser diodes emission. The CCD is working in a unique mode called flash during transfer (FDT) which allows identification of target patterns in severe optical environments. It provides high accuracy for distance and angular position of targets. The absence of moving mechanical parts ensures high reliability for this sensor. The large field of view and the high measurement rate give a global situation assessment and a short reaction time. Then, tracking and filtering algorithms have been developed in order to select the target, on which the equipped vehicle determines its safety distance and speed, taking into account its maneuvering and the behaviors of other vehicles.

  17. Management Information System Project. Data Processors Manual to the Program Oriented Accounting System: The Budgetary Process.

    ERIC Educational Resources Information Center

    Foley, Walter; Harr, Gordon

    The purpose of this manual is to serve the needs of a data processing facility in the operation of a management information system (MIS). Included in the manual are system flowcharts, job control language, and system documentation. The system has been field tested and operates under IBM System 360/Model 65-05-MVT-HASP. The programing language is…

  18. An adaptive learning control system for aircraft

    NASA Technical Reports Server (NTRS)

    Mekel, R.; Nachmias, S.

    1978-01-01

    A learning control system and its utilization as a flight control system for F-8 Digital Fly-By-Wire (DFBW) research aircraft is studied. The system has the ability to adjust a gain schedule to account for changing plant characteristics and to improve its performance and the plant's performance in the course of its own operation. Three subsystems are detailed: (1) the information acquisition subsystem which identifies the plant's parameters at a given operating condition; (2) the learning algorithm subsystem which relates the identified parameters to predetermined analytical expressions describing the behavior of the parameters over a range of operating conditions; and (3) the memory and control process subsystem which consists of the collection of updated coefficients (memory) and the derived control laws. Simulation experiments indicate that the learning control system is effective in compensating for parameter variations caused by changes in flight conditions.

  19. Production accounting and controls at the Naval Petroleum Reserve No. 1, Elk Hills, California

    SciTech Connect

    Not Available

    1987-07-17

    Purpose of the audit was to determine if the Reserve's crude oil and gas products were properly accounted for and controlled from well-head to ultimate use or sale and physical controls and security measures at the Reserve were sufficient to ensure that Government assets were safeguarded as required. Our review showed that the Reserve used sales rather than actual production as the basis for its production accounting process. This method of accounting gave the Reserve only an approximation of the oil and gas it produced. Security measures had been significantly improved since the Reserve was opened; however, there were certain well and tank site areas which were not adequately secured and safeguarded against loss. During the course of the audit, management took prompt action to enhance security procedures.

  20. 34 CFR 691.81 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 4 2013-07-01 2013-07-01 false Fiscal control and fund accounting procedures. 691.81 Section 691.81 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION (CONTINUED) ACADEMIC COMPETITIVENESS GRANT (ACG) AND NATIONAL SCIENCE AND MATHEMATICS ACCESS...

  1. Towards a New Science: Control and Accountability in Collaborations between Workers and Scientists.

    ERIC Educational Resources Information Center

    Merrifield, Juliet; Lippin, Tobi

    1989-01-01

    An occupational health survey conducted by union members in collaboration with an epidemiologist found that stress is a major occupational hazard. Conflict over dissemination of the results raised issues about who controls the research process and its outcomes, to whom are researchers accountable, and whether the scientific method can be used to…

  2. 45 CFR 1180.53 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Fiscal control and fund accounting procedures. 1180.53 Section 1180.53 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES INSTITUTE OF MUSEUM AND LIBRARY SERVICES GRANTS REGULATIONS...

  3. 45 CFR 1180.53 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Fiscal control and fund accounting procedures. 1180.53 Section 1180.53 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES INSTITUTE OF MUSEUM AND LIBRARY SERVICES GRANTS REGULATIONS...

  4. 45 CFR 1180.53 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Fiscal control and fund accounting procedures. 1180.53 Section 1180.53 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES INSTITUTE OF MUSEUM AND LIBRARY SERVICES GRANTS REGULATIONS...

  5. 45 CFR 1180.53 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Fiscal control and fund accounting procedures. 1180.53 Section 1180.53 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES INSTITUTE OF MUSEUM AND LIBRARY SERVICES GRANTS REGULATIONS...

  6. 45 CFR 1180.53 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Fiscal control and fund accounting procedures. 1180.53 Section 1180.53 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES INSTITUTE OF MUSEUM AND LIBRARY SERVICES GRANTS REGULATIONS...

  7. Color-Object Interference: Further Tests of an Executive Control Account

    ERIC Educational Resources Information Center

    La Heij, Wido; Boelens, Harrie

    2011-01-01

    Young children are slower in naming the color of a meaningful picture than in naming the color of an abstract form (Stroop-like color-object interference). The current experiments tested an executive control account of this phenomenon. First, color-object interference was observed in 6- and 8-year-olds but not in 12- and 16-year-olds (Experiment…

  8. 78 FR 67223 - Proposed Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... for public comment the following draft NUREGs: NUREG-1280, Revision 2, ``Acceptable Standard Format... Material;'' NUREG-2159, ``Acceptable Standard Format and Content for the Material Control and Accounting (MC&A) Plan Required for Special Nuclear Material of Moderate Strategic Significance;''...

  9. 10 CFR 63.78 - Material control and accounting records and reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Material control and accounting records and reports. 63.78 Section 63.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Records, Reports, Tests, and Inspections §...

  10. 10 CFR 63.78 - Material control and accounting records and reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Material control and accounting records and reports. 63.78 Section 63.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Records, Reports, Tests, and Inspections §...

  11. 10 CFR 63.78 - Material control and accounting records and reports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Material control and accounting records and reports. 63.78 Section 63.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Records, Reports, Tests, and Inspections §...

  12. 10 CFR 63.78 - Material control and accounting records and reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Material control and accounting records and reports. 63.78 Section 63.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Records, Reports, Tests, and Inspections §...

  13. 10 CFR 63.78 - Material control and accounting records and reports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Material control and accounting records and reports. 63.78 Section 63.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Records, Reports, Tests, and Inspections §...

  14. 34 CFR 691.81 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Fiscal control and fund accounting procedures. 691.81 Section 691.81 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION ACADEMIC COMPETITIVENESS GRANT (ACG) AND NATIONAL SCIENCE AND MATHEMATICS ACCESS TO RETAIN...

  15. 34 CFR 691.81 - Fiscal control and fund accounting procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... provisions for maintaining general fiscal records in this part and in 34 CFR 668.24(b). (b) An institution shall maintain funds received under this part in accordance with the requirements in 34 CFR 668.164... 34 Education 4 2011-07-01 2011-07-01 false Fiscal control and fund accounting procedures....

  16. 75 FR 54802 - Account Ownership and Control Report; Notice of Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... conference call is set forth below. \\1\\ 75 FR 41775 (July 19, 2010). U.S./Canada Toll-Free: (866) 312-4390...-mail at OCR@cftc.gov . ``Account Ownership and Control Report'' must be in the subject field...

  17. 10 CFR 76.111 - Physical security, material control and accounting, and protection of certain information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Physical security, material control and accounting, and protection of certain information. 76.111 Section 76.111 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safeguards and Security § 76.111 Physical security, material...

  18. 10 CFR 76.111 - Physical security, material control and accounting, and protection of certain information.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Physical security, material control and accounting, and protection of certain information. 76.111 Section 76.111 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safeguards and Security § 76.111 Physical security, material...

  19. 10 CFR 76.111 - Physical security, material control and accounting, and protection of certain information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Physical security, material control and accounting, and protection of certain information. 76.111 Section 76.111 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safeguards and Security § 76.111 Physical security, material...

  20. 10 CFR 76.111 - Physical security, material control and accounting, and protection of certain information.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Physical security, material control and accounting, and protection of certain information. 76.111 Section 76.111 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safeguards and Security § 76.111 Physical security, material...

  1. 10 CFR 76.111 - Physical security, material control and accounting, and protection of certain information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Physical security, material control and accounting, and protection of certain information. 76.111 Section 76.111 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safeguards and Security § 76.111 Physical security, material...

  2. 77 FR 60482 - Regulatory Guide 5.67, Material Control and Accounting for Uranium Enrichment Facilities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... Portsmouth Gaseous Diffusion Plants (GDPs) to develop their material control and accounting (MC&A) programs... Facilities'' to develop the FNMC plans for the two GDPs in the 1990s. The NRC is withdrawing this regulatory guide because NUREG/CR-5734 is more comprehensive than RG 5.67 and is applicable to the Paducah GDP...

  3. Q-Axis Flux-Based Sensorless Vector Control of Induction Motor Taking into Account Iron Loss

    NASA Astrophysics Data System (ADS)

    Tsuji, Mineo; Chen, Shuo; Kai, Toshihiro; Hamasaki, Shin-Ichi

    This paper presents a sensorless vector control system for induction motors by taking into account iron loss, in which a flux-observer-based method is applied. Since the flux observer is constructed in a synchronously rotating reference frame with respect to the rotor flux of a current model and the iron loss resistance of parallel exiting circuit is used, the proposed system is very simple and the compensation of iron loss related to the operating frequency is directly realized while calculating rotor fluxes and slip frequency. The accuracies of estimated torque and speed are improved. The effectiveness of the proposed system has been verified by digital simulation and experimentation.

  4. Pollution control system

    SciTech Connect

    Voliva, B.H.; Bernstein, I.B.

    1984-09-25

    A pollution control system is disclosed wherein condensable pollutants are removed from a high-temperature gas stream by counterflow contact in a vertical tower with downwardly flowing, relatively cool absorbent oil. The absorbent is at a sufficiently low temperature so as to rapidly condense a portion of the pollutants in order to form a fog of fine droplets of pollutant entrained by the gas stream, which fog is incapable of being absorbed by the absorbent. The remainder of the condensable pollutants is removed by downwardly flowing absorbent oil, and the gas and entrained fog are directed from the tower to gas/droplet separation means, such as an electrostatic precipitator. The fog is thereby separated from the gas and substantially pollutant-free gas is discharged to the atmosphere.

  5. Optically controlled welding system

    NASA Technical Reports Server (NTRS)

    Gordon, Stephen S. (Inventor)

    1989-01-01

    An optically controlled welding system (10) wherein a welding torch (12) having through-the-torch viewing capabilities is provided with an optical beam splitter (56) to create a transmitted view and a reflective view of a welding operation. These views are converted to digital signals which are then processed and utilized by a computerized robotic welder (15) to make the welding torch responsive thereto. Other features includes an actively cooled electrode holder (26) which minimizes a blocked portion of the view by virtue of being constructed of a single spoke or arm (28) and a weld pool contour detector (14) comprising a laser beam directed onto the weld pool with the position of specular radiation reflected therefrom being characteristic of a penetrated or unpenetrated condition of the weld pool.

  6. Optically controlled welding system

    NASA Technical Reports Server (NTRS)

    Gordon, Stephen S. (Inventor)

    1988-01-01

    An optically controlled welding system wherein a welding torch having through-the-torch viewing capabilities is provided with an optical beam splitter to create a transmitted view and a reflective view of a welding operation. These views are converted to digital signals which are then processed and utilized by a computerized robotic welder to make the welding torch responsive thereto. Other features include an actively cooled electrode holder which minimizes a blocked portion of the view by virtue of being constructed of a single spoke or arm, and a weld pool contour detector comprising a laser beam directed onto the weld pool with the position of specular radiation reflected therefrom, being characteristic of a penetrated or unpenetrated condition of the weld pool.

  7. On Restructurable Control System Theory

    NASA Technical Reports Server (NTRS)

    Athans, M.

    1983-01-01

    The state of stochastic system and control theory as it impacts restructurable control issues is addressed. The multivariable characteristics of the control problem are addressed. The failure detection/identification problem is discussed as a multi-hypothesis testing problem. Control strategy reconfiguration, static multivariable controls, static failure hypothesis testing, dynamic multivariable controls, fault-tolerant control theory, dynamic hypothesis testing, generalized likelihood ratio (GLR) methods, and adaptive control are discussed.

  8. 7 CFR 1767.13 - Departures from the prescribed RUS Uniform System of Accounts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Departures from the prescribed RUS Uniform System of Accounts. 1767.13 Section 1767.13 Agriculture Regulations of the Department of Agriculture (Continued... BORROWERS Uniform System of Accounts § 1767.13 Departures from the prescribed RUS Uniform System of...

  9. 7 CFR 1767.13 - Departures from the prescribed RUS Uniform System of Accounts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Departures from the prescribed RUS Uniform System of Accounts. 1767.13 Section 1767.13 Agriculture Regulations of the Department of Agriculture (Continued... BORROWERS Uniform System of Accounts § 1767.13 Departures from the prescribed RUS Uniform System of...

  10. 7 CFR 1767.13 - Departures from the prescribed RUS Uniform System of Accounts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Departures from the prescribed RUS Uniform System of Accounts. 1767.13 Section 1767.13 Agriculture Regulations of the Department of Agriculture (Continued... BORROWERS Uniform System of Accounts § 1767.13 Departures from the prescribed RUS Uniform System of...

  11. 48 CFR 53.301-1408 - Preaward Survey of Prospective Contractor-Accounting System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Preaward Survey of Prospective Contractor-Accounting System. 53.301-1408 Section 53.301-1408 Federal Acquisition Regulations...-1408 Preaward Survey of Prospective Contractor—Accounting System. EC01MY91.093 EC01MY91.094...

  12. Thermal control system technology discipline

    NASA Technical Reports Server (NTRS)

    Ellis, Wilbert E.

    1990-01-01

    Viewgraphs on thermal control systems technology discipline for Space Station Freedom are presented. Topics covered include: heat rejection; heat acquisition and transport; monitoring and control; passive thermal control; and analysis and test verification.

  13. Accountability in the Ontario Cancer Services System: A Qualitative Study of System Leaders' Perspectives

    PubMed Central

    Bytautas, Jessica; Dobrow, Mark; Sullivan, Terrence; Brown, Adalsteinn

    2014-01-01

    Cancer Care Ontario (CCO), the provincial cancer agency, operates under a model of accountable governance that has been hailed as exemplary. We explored cancer system leaders' views on the balance and perceived efficacy of approaches to accountability in this context. Semi-structured interviews were conducted with 19 participants (MOHLTC=5, CCO=14). Adopting a qualitative descriptive approach, we coded data for four policy instruments used in approaches to accountability. Financial incentives are a key lever used by both parties to effect change. Cancer-specific regulations were somewhat weak, but agency-wide directives were a necessary nuisance that had great force. The effect of public reporting on mobilizing consumer sovereignty was questioned; however, transparency for its own sake was highly valued. Professionalism and stewardship, with an emphasis on trust-based partnerships and clinical engagement, were critical to CCO's success. These approaches were seen to work together, but what made each have force was reliance on professionalism and stewardship. PMID:25305388

  14. Accountability in the ontario cancer services system: a qualitative study of system leaders' perspectives.

    PubMed

    Bytautas, Jessica; Dobrow, Mark; Sullivan, Terrence; Brown, Adalsteinn

    2014-09-01

    Cancer Care Ontario (CCO), the provincial cancer agency, operates under a model of accountable governance that has been hailed as exemplary. We explored cancer system leaders' views on the balance and perceived efficacy of approaches to accountability in this context. Semi-structured interviews were conducted with 19 participants (MOHLTC=5, CCO=14). Adopting a qualitative descriptive approach, we coded data for four policy instruments used in approaches to accountability. Financial incentives are a key lever used by both parties to effect change. Cancer-specific regulations were somewhat weak, but agency-wide directives were a necessary nuisance that had great force. The effect of public reporting on mobilizing consumer sovereignty was questioned; however, transparency for its own sake was highly valued. Professionalism and stewardship, with an emphasis on trust-based partnerships and clinical engagement, were critical to CCO's success. These approaches were seen to work together, but what made each have force was reliance on professionalism and stewardship. PMID:25305388

  15. Division 1137 property control system

    SciTech Connect

    Pastor, D.J.

    1982-01-01

    An automated data processing property control system was developed by Mobile and Remote Range Division 1137. This report describes the operation of the system and examines ways of using it in operational planning and control.

  16. Environment control system

    DOEpatents

    Sammarone, Dino G.

    1978-01-01

    A system for controlling the environment of an enclosed area in nuclear reactor installations. The system permits the changing of the environment from nitrogen to air, or from air to nitrogen, without the release of any radioactivity or process gas to the outside atmosphere. In changing from a nitrogen to an air environment, oxygen is inserted into the enclosed area at the same rate which the nitrogen-oxygen gas mixture is removed from the enclosed area. The nitrogen-oxygen gas mixture removed from the enclosed area is mixed with hydrogen, the hydrogen recombining with the oxygen present in the gas to form water. The water is then removed from the system and, if it contains any radioactive products, can be utilized to form concrete, which can then be transferred to a licensed burial site. The process gas is purified further by stripping it of carbon dioxide and then distilling it to remove any xenon, krypton, and other fission or non-condensable gases. The pure nitrogen is stored as either a cryogenic liquid or a gas. In changing from an air to nitrogen environment, the gas is removed from the enclosed area, mixed with hydrogen to remove the oxygen present, dried, passed through adsorption beds to remove any fission gases, and reinserted into the enclosed area. Additionally, the nitrogen stored during the nitrogen to air change, is inserted into the enclosed area, the nitrogen from both sources being inserted into the enclosed area at the same rate as the removal of the gas from the containment area. As designed, the amount of nitrogen stored during the nitrogen to air change substantially equals that required to replace oxygen removed during an air to nitrogen change.

  17. NSLS control system upgrade status

    SciTech Connect

    Smith, J.; Ramamoorthy, S.; Tang, Y.; Flannigan, J.; Sathe, S.; Keane, J.; Krinsky, S.

    1993-07-01

    The NSLS control system initially installed in 1978 has undergone several modifications but the basic system architecture remained relatively unchanged. The need for faster response, increased reliability and better diagnostics made the control system upgrade a priority. Since the NSLS runs continuously, major changes to the control system are difficult. The upgrade plan had to allow continuous incremental changes to the control system without having any detrimental effect on operations. The plan had to provide for immediate improvement in a few key areas, such as data access rates, and be complete in a short time. At present, most accelerator operations utilize the upgraded control system.

  18. Automation and Accountability in Decision Support System Interface Design

    ERIC Educational Resources Information Center

    Cummings, Mary L.

    2006-01-01

    When the human element is introduced into decision support system design, entirely new layers of social and ethical issues emerge but are not always recognized as such. This paper discusses those ethical and social impact issues specific to decision support systems and highlights areas that interface designers should consider during design with an…

  19. Reforming the Structure of Florida's Accountability System. Policy Brief.

    ERIC Educational Resources Information Center

    Dorn, Sherman

    2004-01-01

    The legal definition of Florida's public education system includes its local public schools, charter schools, voucher schools, and schools contracted to provide special education services. The constitutional mandate for a "uniform, efficient, safe, secure, and high-quality system of free public schools" suggests that the expectations of a high…

  20. 14 CFR Sec. 1-4 - System of accounts coding.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) A fifth digit, appended as a decimal, has been assigned for internal control by the BTS of... different fifth digit code number from that assigned by the BTS may be adopted for internal recordkeeping by... the code number assigned by the BTS is employed in reporting to the BTS on Form 41 Reports....

  1. 14 CFR 1-4 - System of accounts coding.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) A fifth digit, appended as a decimal, has been assigned for internal control by the BTS of... different fifth digit code number from that assigned by the BTS may be adopted for internal recordkeeping by... the code number assigned by the BTS is employed in reporting to the BTS on Form 41 Reports....

  2. 14 CFR Sec. 1-4 - System of accounts coding.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) A fifth digit, appended as a decimal, has been assigned for internal control by the BTS of... different fifth digit code number from that assigned by the BTS may be adopted for internal recordkeeping by... the code number assigned by the BTS is employed in reporting to the BTS on Form 41 Reports....

  3. 14 CFR Sec. 1-4 - System of accounts coding.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) A fifth digit, appended as a decimal, has been assigned for internal control by the BTS of... different fifth digit code number from that assigned by the BTS may be adopted for internal recordkeeping by... the code number assigned by the BTS is employed in reporting to the BTS on Form 41 Reports....

  4. 14 CFR Sec. 1-4 - System of accounts coding.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) A fifth digit, appended as a decimal, has been assigned for internal control by the BTS of... different fifth digit code number from that assigned by the BTS may be adopted for internal recordkeeping by... the code number assigned by the BTS is employed in reporting to the BTS on Form 41 Reports....

  5. Aircraft control system

    NASA Technical Reports Server (NTRS)

    Kendall, Greg T. (Inventor); Morgan, Walter R. (Inventor)

    2010-01-01

    A span-loaded, highly flexible flying wing, having horizontal control surfaces mounted aft of the wing on extended beams to form local pitch-control devices. Each of five spanwise wing segments of the wing has one or more motors and photovoltaic arrays, and produces its own lift independent of the other wing segments, to minimize inter-segment loads. Wing dihedral is controlled by separately controlling the local pitch-control devices consisting of a control surface on a boom, such that inboard and outboard wing segment pitch changes relative to each other, and thus relative inboard and outboard lift is varied.

  6. Learning to Control Advanced Life Support Systems

    NASA Technical Reports Server (NTRS)

    Subramanian, Devika

    2004-01-01

    Advanced life support systems have many interacting processes and limited resources. Controlling and optimizing advanced life support systems presents unique challenges. In particular, advanced life support systems are nonlinear coupled dynamical systems and it is difficult for humans to take all interactions into account to design an effective control strategy. In this project. we developed several reinforcement learning controllers that actively explore the space of possible control strategies, guided by rewards from a user specified long term objective function. We evaluated these controllers using a discrete event simulation of an advanced life support system. This simulation, called BioSim, designed by Nasa scientists David Kortenkamp and Scott Bell has multiple, interacting life support modules including crew, food production, air revitalization, water recovery, solid waste incineration and power. They are implemented in a consumer/producer relationship in which certain modules produce resources that are consumed by other modules. Stores hold resources between modules. Control of this simulation is via adjusting flows of resources between modules and into/out of stores. We developed adaptive algorithms that control the flow of resources in BioSim. Our learning algorithms discovered several ingenious strategies for maximizing mission length by controlling the air and water recycling systems as well as crop planting schedules. By exploiting non-linearities in the overall system dynamics, the learned controllers easily out- performed controllers written by human experts. In sum, we accomplished three goals. We (1) developed foundations for learning models of coupled dynamical systems by active exploration of the state space, (2) developed and tested algorithms that learn to efficiently control air and water recycling processes as well as crop scheduling in Biosim, and (3) developed an understanding of the role machine learning in designing control systems for

  7. System for controlling apnea

    SciTech Connect

    Holzrichter, John F

    2015-05-05

    An implanted stimulation device or air control device are activated by an external radar-like sensor for controlling apnea. The radar-like sensor senses the closure of the air flow cavity, and associated control circuitry signals (1) a stimulator to cause muscles to open the air passage way that is closing or closed or (2) an air control device to open the air passage way that is closing or closed.

  8. Networked control of microgrid system of systems

    NASA Astrophysics Data System (ADS)

    Mahmoud, Magdi S.; Rahman, Mohamed Saif Ur; AL-Sunni, Fouad M.

    2016-08-01

    The microgrid has made its mark in distributed generation and has attracted widespread research. However, microgrid is a complex system which needs to be viewed from an intelligent system of systems perspective. In this paper, a network control system of systems is designed for the islanded microgrid system consisting of three distributed generation units as three subsystems supplying a load. The controller stabilises the microgrid system in the presence of communication infractions such as packet dropouts and delays. Simulation results are included to elucidate the effectiveness of the proposed control strategy.

  9. SP-100 Control System Design

    NASA Astrophysics Data System (ADS)

    Shukla, Jaikaran N.; Halfen, Frank J.; Brynsvold, Glen V.; Syed, Akbar; Jiang, Thomas J.; Wong, Kwok K.; Otwell, Robert L.

    1994-07-01

    Recent work in lower power generic early applications for the SP-100 have resulted in control system design simplification for a 20 kWe design with thermoelectric power conversion. This paper presents the non-mission-dependent control system features for this design. The control system includes a digital computer based controller, dual purpose control rods and drives, temperature sensors, and neutron flux monitors. The thaw system is mission dependent and can be either electrical or based on NaK trace lines. Key features of the control system and components are discussed. As was the case for higher power applications, the initial on-orbit approach to criticality involves the relatively fast withdrawal of the control-rods to a near-critical position followed by slower movement through critical and into the power range. The control system performs operating maneuvers as well as providing for automatic startup, shutdown, restart, and reactor protection.

  10. Control of corruption, democratic accountability, and effectiveness of HIV/AIDS official development assistance

    PubMed Central

    Lee, Hwa-Young; Yang, Bong-Ming; Kang, Minah

    2016-01-01

    Background Despite continued global efforts, HIV/AIDS outcomes in developing countries have not made much progress. Poor governance in recipient countries is often seen as one of the reasons for ineffectiveness of aid efforts to achieve stated objectives and desired outcomes. Objective This study examines the impact of two important dimensions of governance – control of corruption and democratic accountability – on the effectiveness of HIV/AIDS official development assistance. Design An empirical analysis using dynamic panel Generalized Method of Moments estimation was conducted on 2001–2010 datasets. Results Control of corruption and democratic accountability revealed an independent effect and interaction with the amount of HIV/AIDS aid on incidence of HIV/AIDS, respectively, while none of the two governance variables had a significant effect on HIV/AIDS prevalence. Specifically, in countries with accountability level below −2.269, aid has a detrimental effect on incidence of HIV/AIDS. Conclusion The study findings suggest that aid programs need to be preceded or at least accompanied by serious efforts to improve governance in recipient countries and that democratic accountability ought to receive more critical attention. PMID:27189199

  11. The RHIC cryogenic control system

    SciTech Connect

    Farah, Y.; Sondericker, J.

    1993-08-01

    A cryogenic process control system for the RHIC Project is discussed. It is independent of the main RHIC Control System, consisting of an upgrade of the existing 24.8 Kw helium refrigerator control section with the addition of a ring control section that regulates and monitors all cryogenic signals in the RHIC tunnel. The system is fully automated, which can run without the continuous presence of operators.

  12. Continuous emission monitoring and accounting automated systems at an HPP

    NASA Astrophysics Data System (ADS)

    Roslyakov, P. V.; Ionkin, I. L.; Kondrateva, O. E.; Borovkova, A. M.; Seregin, V. A.; Morozov, I. V.

    2015-03-01

    Environmental and industrial emission monitoring at HPP's is a very urgent task today. Industrial monitoring assumes monitoring of emissions of harmful pollutants and optimization of fuel combustion technological processes at HPP's. Environmental monitoring is a system to assess ambient air quality with respect to a number of separate sources of harmful substances in pollution of atmospheric air of the area. Works on creating an industrial monitoring system are carried out at the National Research University Moscow Power Engineering Institute (MPEI) on the basis of the MPEI combined heat and power plant, and environmental monitoring stations are installed in Lefortovo raion, where the CHPP is located.

  13. SPring-8 beamline control system.

    PubMed

    Ohata, T; Konishi, H; Kimura, H; Furukawa, Y; Tamasaku, K; Nakatani, T; Tanabe, T; Matsumoto, N; Ishii, M; Ishikawa, T

    1998-05-01

    The SPring-8 beamline control system is now taking part in the control of the insertion device (ID), front end, beam transportation channel and all interlock systems of the beamline: it will supply a highly standardized environment of apparatus control for collaborative researchers. In particular, ID operation is very important in a third-generation synchrotron light source facility. It is also very important to consider the security system because the ID is part of the storage ring and is therefore governed by the synchrotron ring control system. The progress of computer networking systems and the technology of security control require the development of a highly flexible control system. An interlock system that is independent of the control system has increased the reliability. For the beamline control system the so-called standard model concept has been adopted. VME-bus (VME) is used as the front-end control system and a UNIX workstation as the operator console. CPU boards of the VME-bus are RISC processor-based board computers operated by a LynxOS-based HP-RT real-time operating system. The workstation and the VME are linked to each other by a network, and form the distributed system. The HP 9000/700 series with HP-UX and the HP 9000/743rt series with HP-RT are used. All the controllable apparatus may be operated from any workstation. PMID:15263588

  14. Distributed systems status and control

    NASA Technical Reports Server (NTRS)

    Kreidler, David; Vickers, David

    1990-01-01

    Concepts are investigated for an automated status and control system for a distributed processing environment. System characteristics, data requirements for health assessment, data acquisition methods, system diagnosis methods and control methods were investigated in an attempt to determine the high-level requirements for a system which can be used to assess the health of a distributed processing system and implement control procedures to maintain an accepted level of health for the system. A potential concept for automated status and control includes the use of expert system techniques to assess the health of the system, detect and diagnose faults, and initiate or recommend actions to correct the faults. Therefore, this research included the investigation of methods by which expert systems were developed for real-time environments and distributed systems. The focus is on the features required by real-time expert systems and the tools available to develop real-time expert systems.

  15. 22 CFR 308.7 - Use of social security account number in records systems. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 2 2012-04-01 2009-04-01 true Use of social security account number in records systems. 308.7 Section 308.7 Foreign Relations PEACE CORPS IMPLEMENTATION OF THE PRIVACY ACT OF 1974 § 308.7 Use of social security account number in records systems....

  16. 22 CFR 308.7 - Use of social security account number in records systems. [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 2 2013-04-01 2009-04-01 true Use of social security account number in records systems. 308.7 Section 308.7 Foreign Relations PEACE CORPS IMPLEMENTATION OF THE PRIVACY ACT OF 1974 § 308.7 Use of social security account number in records systems....

  17. 22 CFR 308.7 - Use of social security account number in records systems. [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 2 2014-04-01 2014-04-01 false Use of social security account number in records systems. 308.7 Section 308.7 Foreign Relations PEACE CORPS IMPLEMENTATION OF THE PRIVACY ACT OF 1974 § 308.7 Use of social security account number in records systems....

  18. A Management Reporting Manual for Colleges: A System of Reporting and Accounting.

    ERIC Educational Resources Information Center

    Hughes, K. Scott; And Others

    This manual, a revision of the 1976 publication entitled "Management Reports," is intended to assist college business officers in establishing sound accounting systems and in preparing readable and meaningful financial management reports. A detailed description of the accounting system and a new expenditure classification structure have been…

  19. Sex Equity, Single Parent, Displaced Homemaker, Single Pregnant Women Programs: Guidebook for Equity Accountability System.

    ERIC Educational Resources Information Center

    Fadale, LaVerna M.; Zhao, Peisheng

    As required by the Carl D. Perkins Vocational and Applied Technology Education Act of 1990 (VATEA), a project was undertaken to develop an accountability system for New York State equity programs funded under sections 221 and 222 of the VATEA. This document profiles the resulting accountability system and serves as a guide for program staff…

  20. 22 CFR 308.7 - Use of social security account number in records systems. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Use of social security account number in records systems. 308.7 Section 308.7 Foreign Relations PEACE CORPS IMPLEMENTATION OF THE PRIVACY ACT OF 1974 § 308.7 Use of social security account number in records systems....

  1. 22 CFR 308.7 - Use of social security account number in records systems. [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Use of social security account number in records systems. 308.7 Section 308.7 Foreign Relations PEACE CORPS IMPLEMENTATION OF THE PRIVACY ACT OF 1974 § 308.7 Use of social security account number in records systems....

  2. The Development of COBOL and RPG Instructional Modules to Audit Computerized Accounting Systems.

    ERIC Educational Resources Information Center

    Skudrna, Vincent J.

    1982-01-01

    Details steps involved (as found in the literature) in the systems approach to design and develop instruction in order to provide a rationale for the development of instructional modules in COBOL and RPG to teach accounting students how to audit computerized accounting systems. Outlines of two modules are appended. (EAO)

  3. 14 CFR Sec. 1-2 - Waivers from this system of accounts and reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Waivers from this system of accounts and reports. Sec. 1-2 Section 1-2 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS UNIFORM SYSTEM OF ACCOUNTS AND REPORTS FOR LARGE...

  4. Defining Strong State Accountability Systems: How Can Better Standards Gain Greater Traction? A First Look

    ERIC Educational Resources Information Center

    Reed, Eileen; Scull, Janie; Slicker, Gerilyn; Winkler, Amber M.

    2012-01-01

    Rigorous standards and aligned assessments are vital tools for boosting education outcomes but they have little traction without strong accountability systems that attach consequences to performance. In this pilot study, Eileen Reed, Janie Scull, Gerilyn Slicker, and Amber Winkler lay out the essential features of such accountability systems,…

  5. 14 CFR Section 1 - Introduction to System of Accounts and Reports

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Introduction to System of Accounts and Reports Section 1 Section 1 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS UNIFORM SYSTEM OF ACCOUNTS AND REPORTS FOR LARGE...

  6. Manual of Accounting for Pennsylvania School Systems Food Service Fund (Cafeteria Fund).

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Education, Harrisburg.

    The purpose of this manual is to provide an accounting system that will accurately measure the financial position and operating results of a food service operation. The accounting system has been designed to be easily adaptable to the reporting requirements established by the Food and Nutrition Service of the United States Department of…

  7. Continuities and Discontinuities in Accounting Systems: 1998 Survey of ASBO International Membership in North America.

    ERIC Educational Resources Information Center

    Henstock, Thomas F.

    1999-01-01

    Based on a survey of Association of School Business Officials members, this article focuses on 10 accounting system modules and how respondents felt about their system's operation and integration. Results showed solid continuity among general ledger, accounts payable, and payroll modules and discontinuities among fixed-asset and student accounting…

  8. Classroom Response Systems Facilitate Student Accountability, Readiness, and Learning

    ERIC Educational Resources Information Center

    Jones, Sara J.; Crandall, Jason; Vogler, Jane S.; Robinson, Daniel H.

    2013-01-01

    In three experiments using crossover designs, we investigated the effects of Classroom Response Systems (CRS) when presenting multiple-choice questions in real classrooms. In Experiment 1, students either used CRS for bonus points or simply saw the questions. There were no differences on a unit exam. In Experiment 2, students were told prior to a…

  9. Accounting: Studying Local Office Systems Enriches Classroom Material

    ERIC Educational Resources Information Center

    Hickey, Judith A.

    1977-01-01

    Suggests that the business teacher develop interaction with local businesses to supplement and reinforce classroom activities, particularly the study of local office systems. Teaching suggestions are included along with advantages of cooperating with local businesses, e.g., keeping teachers abreast of innovations and changes in the business world…

  10. Accountability and Productivity: Report for the Illinois Community College System.

    ERIC Educational Resources Information Center

    Illinois Community Coll. Board, Springfield.

    Within the Illinois Community College System (ICCS), each of the 50 member colleges reports to the Illinois Community College Board (ICCB) on their productivity improvements. This report summarizes the productivity reports of the ICCS colleges, examines the results of a series of analyses of productivity conducted by the ICCB from a statewide…

  11. System Accountability Report 2013-14. Appendix: Data Tables

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    Information Resource Management-State University System of Florida (IRM-SUS) is the primary collector and provider of data concerning state universities that is used to make sound education policy decisions. The office provides technical assistance to those using the information, state and federal reporting support, those supplying information,…

  12. An enactive and dynamical systems theory account of dyadic relationships.

    PubMed

    Kyselo, Miriam; Tschacher, Wolfgang

    2014-01-01

    Many social relationships are a locus of struggle and suffering, either at the individual or interactional level. In this paper we explore why this is the case and suggest a modeling approach for dyadic interactions and the well-being of the participants. To this end we bring together an enactive approach to self with dynamical systems theory. Our basic assumption is that the quality of any social interaction or relationship fundamentally depends on the nature and constitution of the individuals engaged in these interactions. From an enactive perspective the self is conceived as an embodied and socially enacted autonomous system striving to maintain an identity. This striving involves a basic two-fold goal: the ability to exist as an individual in one's own right, while also being open to and affected by others. In terms of dynamical systems theory one can thus consider the individual self as a self-other organized system represented by a phase space spanned by the dimensions of distinction and participation, where attractors can be defined. Based on two everyday examples of dyadic relationship we propose a simple model of relationship dynamics, in which struggle or well-being in the dyad is analyzed in terms of movements of dyadic states that are in tension or in harmony with individually developed attractors. Our model predicts that relationships can be sustained when the dyad develops a new joint attractor toward which dyadic states tend to move, and well-being when this attractor is in balance with the individuals' attractors. We outline how this can inspire research on psychotherapy. The psychotherapy process itself provides a setting that supports clients to become aware how they fare with regards to the two-fold norm of distinction and participation and develop, through active engagement between client (or couple) and therapist, strategies to co-negotiate their self-organization. PMID:24910623

  13. An enactive and dynamical systems theory account of dyadic relationships

    PubMed Central

    Kyselo, Miriam; Tschacher, Wolfgang

    2014-01-01

    Many social relationships are a locus of struggle and suffering, either at the individual or interactional level. In this paper we explore why this is the case and suggest a modeling approach for dyadic interactions and the well-being of the participants. To this end we bring together an enactive approach to self with dynamical systems theory. Our basic assumption is that the quality of any social interaction or relationship fundamentally depends on the nature and constitution of the individuals engaged in these interactions. From an enactive perspective the self is conceived as an embodied and socially enacted autonomous system striving to maintain an identity. This striving involves a basic two-fold goal: the ability to exist as an individual in one’s own right, while also being open to and affected by others. In terms of dynamical systems theory one can thus consider the individual self as a self-other organized system represented by a phase space spanned by the dimensions of distinction and participation, where attractors can be defined. Based on two everyday examples of dyadic relationship we propose a simple model of relationship dynamics, in which struggle or well-being in the dyad is analyzed in terms of movements of dyadic states that are in tension or in harmony with individually developed attractors. Our model predicts that relationships can be sustained when the dyad develops a new joint attractor toward which dyadic states tend to move, and well-being when this attractor is in balance with the individuals’ attractors. We outline how this can inspire research on psychotherapy. The psychotherapy process itself provides a setting that supports clients to become aware how they fare with regards to the two-fold norm of distinction and participation and develop, through active engagement between client (or couple) and therapist, strategies to co-negotiate their self-organization. PMID:24910623

  14. Supervisory control systems

    NASA Technical Reports Server (NTRS)

    Sheridan, T. B.

    1974-01-01

    The various functions of a computer are considered that serve in connecting the man, with his displays and controls, to an external environment, manipulator activators and the interoceptors that are in the actuators, and to the interosensors and the motors or the actuators to drive the sensors. Projected is an improved exoskeleton mechanism with computer control and some supervisory control that may give a quadriplegic the ability to walk and run around.

  15. Controls of maglev suspension systems

    SciTech Connect

    Cai, Y.; Zhu, S.; Chen, S.S.; Rote, D.M.

    1993-06-01

    This study investigates alternative control designs of maglev vehicle suspension systems. Active and semi-active control law designs are introduced into primary and secondary suspensions of maglev vehicles. A one-dimensional vehicle with two degrees of freedom, to simulate the German Transrapid Maglev System, is used for suspension control designs. The transient and frequency responses of suspension systems and PSDs of vehicle accelerations are calculated to evaluate different control designs. The results show that active and semi-active control designs indeed improve the response of vehicle and provide an acceptable ride comfort for maglev systems.

  16. Recommendations for an Executive Information System (EIS) for the NASA Accounting and Financial Information System (NAFIS)

    NASA Technical Reports Server (NTRS)

    Goss, Ernest Preston

    1991-01-01

    The objectives were to: (1) survey state-of-the-art computing architectures, tools, and technologies for implementing an Executive Information System (EIS); (2) review MSFC capabilities and efforts in developing an EIS for Shuttle Projects Office and the Payloads Project Office; (3) review management reporting requirements for the NASA Accounting and Financial Information System (NAFIS) Project in the areas of cost, schedule, and technical performance, and insure that the EIS fully supports these requirements; and (4) develop and implement a pilot concept for a NAFIS EIS. A summary of the findings of this work is presented.

  17. The ATLAS Detector Control System

    NASA Astrophysics Data System (ADS)

    Lantzsch, K.; Arfaoui, S.; Franz, S.; Gutzwiller, O.; Schlenker, S.; Tsarouchas, C. A.; Mindur, B.; Hartert, J.; Zimmermann, S.; Talyshev, A.; Oliveira Damazio, D.; Poblaguev, A.; Braun, H.; Hirschbuehl, D.; Kersten, S.; Martin, T.; Thompson, P. D.; Caforio, D.; Sbarra, C.; Hoffmann, D.; Nemecek, S.; Robichaud-Veronneau, A.; Wynne, B.; Banas, E.; Hajduk, Z.; Olszowska, J.; Stanecka, E.; Bindi, M.; Polini, A.; Deliyergiyev, M.; Mandic, I.; Ertel, E.; Marques Vinagre, F.; Ribeiro, G.; Santos, H. F.; Barillari, T.; Habring, J.; Huber, J.; Arabidze, G.; Boterenbrood, H.; Hart, R.; Iakovidis, G.; Karakostas, K.; Leontsinis, S.; Mountricha, E.; Ntekas, K.; Filimonov, V.; Khomutnikov, V.; Kovalenko, S.; Grassi, V.; Mitrevski, J.; Phillips, P.; Chekulaev, S.; D'Auria, S.; Nagai, K.; Tartarelli, G. F.; Aielli, G.; Marchese, F.; Lafarguette, P.; Brenner, R.

    2012-12-01

    The ATLAS experiment is one of the multi-purpose experiments at the Large Hadron Collider (LHC) at CERN, constructed to study elementary particle interactions in collisions of high-energy proton beams. Twelve different sub detectors as well as the common experimental infrastructure are controlled and monitored by the Detector Control System (DCS) using a highly distributed system of 140 server machines running the industrial SCADA product PVSS. Higher level control system layers allow for automatic control procedures, efficient error recognition and handling, manage the communication with external systems such as the LHC controls, and provide a synchronization mechanism with the ATLAS data acquisition system. Different databases are used to store the online parameters of the experiment, replicate a subset used for physics reconstruction, and store the configuration parameters of the systems. This contribution describes the computing architecture and software tools to handle this complex and highly interconnected control system.

  18. Accountable communities: how norms and values affect health system change.

    PubMed

    Steinberg, C R; Baxter, R J

    1998-01-01

    Economic forces, policy initiatives, and technological change push markets along what some hypothesize is a common evolutionary path. Observations from twelve sites, however, indicate that the pace and direction of change are highly variable across markets. Other forces, internal and unique to a community, help to explain this variation. These forces emanate from the underlying history, culture, and values of a community and in part dictate the response of various players to the more common forces. This paper explores the mechanisms through which these forces operate and their relationship to health system change. PMID:9691558

  19. Fluid delivery control system

    SciTech Connect

    Hoff, Brian D.; Johnson, Kris William; Algrain, Marcelo C.; Akasam, Sivaprasad

    2006-06-06

    A method of controlling the delivery of fluid to an engine includes receiving a fuel flow rate signal. An electric pump is arranged to deliver fluid to the engine. The speed of the electric pump is controlled based on the fuel flow rate signal.

  20. Bibliographic Access and Control System.

    ERIC Educational Resources Information Center

    Kelly, Betsy; And Others

    1982-01-01

    Presents a brief summary of the functions of the Bibliographic Access & Control System (BACS) implemented at the Washington University School of Medicine Library, and outlines the design, development, and uses of the system. Bibliographic control of books and serials and user access to the system are also discussed. (Author/JL)

  1. Framework for control system development

    SciTech Connect

    Cork, C.; Nishimura, Hiroshi.

    1991-11-01

    Control systems being developed for the present generation of accelerators will need to adapt to changing machine and operating state conditions. Such systems must also be capable of evolving over the life of the accelerator operation. In this paper we present a framework for the development of adaptive control systems.

  2. A telerobotic digital controller system

    NASA Technical Reports Server (NTRS)

    Brown, Richard J.

    1992-01-01

    This system is a network of joint mounted dual axes digital servo-controllers (DDSC), providing control of various joints and end effectors of different robotic systems. This report provides description of and user required information for the Digital Controller System Network (DSCN) and, in particular, the DDSC, Model DDSC-2, developed to perform the controller functions. The DDSC can control 3 phase brushless or brush type DC motors, requiring up to 8 amps. Only four wires, two for power and 2 for serial communication, are required, except for local sensor and motor connections. This highly capable, very flexible, programmable servo-controller, contained on a single, compact printed circuit board measuring only 4.5 x 5.1 inches, is applicable to control systems of all types from sub-arc second precision pointing to control of robotic joints and end effectors. This document concentrates on the robotic applications for the DDSC.

  3. Moving Object Control System

    NASA Technical Reports Server (NTRS)

    Arndt, G. Dickey (Inventor); Carl, James R. (Inventor)

    2001-01-01

    A method is provided for controlling two objects relatively moveable with respect to each other. A plurality of receivers are provided for detecting a distinctive microwave signal from each of the objects and measuring the phase thereof with respect to a reference signal. The measured phase signal is used to determine a distance between each of the objects and each of the plurality of receivers. Control signals produced in response to the relative distances are used to control the position of the two objects.

  4. Resource control in ATLAS distributed data management: Rucio Accounting and Quotas

    NASA Astrophysics Data System (ADS)

    Barisits, M.; Serfon, C.; Garonne, V.; Lassnig, M.; Beermann, T.; Vigne, R.

    2015-12-01

    The ATLAS Distributed Data Management system manages more than 160PB of physics data across more than 130 sites globally. Rucio, the next generation Distributed Data Management system of the ATLAS experiment, replaced DQ2 in December 2014 and will manage the experiment's data throughout Run 2 of the LHC and beyond. The previous data management system pursued a rather simplistic approach for resource management, but with the increased data volume and more dynamic handling of data workflows required by the experiment, a more elaborate approach is needed. Rucio was delivered with an initial quota system, but during the first months of operation it turned out to not fully satisfy the collaboration's resource management needs. We consequently introduce a new concept of declaring quota policies (limits) for accounts in Rucio. This new quota concept is based on accounts and RSE (Rucio storage element) expressions, which allows the definition of hierarchical quotas in a dynamic way. This concept enables the operators of the data management system to implement very specific policies for users, physics groups and production systems while, at the same time, lowering the operational burden. This contribution describes the concept, architecture and workflow of the system and includes an evaluation measuring the performance of the system.

  5. Power management and control for space systems

    NASA Technical Reports Server (NTRS)

    Finke, R. C.; Myers, I. T.; Terdan, F. F.; Stevens, N. J.

    1978-01-01

    Power management and control technology for the large, high-power spacecraft of the 1980's is discussed. Systems weight optimization that indicate a need for higher bus voltages are shown. Environmental interactions that are practical limits for the maximum potential on exposed surfaces are shown. A dual-voltage system is proposed that would provide the weight savings of a high-voltage distribution system and take into account the potential environmental interactions. The technology development of new components and circuits is also discussed.

  6. [Controlling systems for operating room managers].

    PubMed

    Schüpfer, G; Bauer, M; Scherzinger, B; Schleppers, A

    2005-08-01

    Management means developing, shaping and controlling of complex, productive and social systems. Therefore, operating room managers also need to develop basic skills in financial and managerial accounting as a basis for operative and strategic controlling which is an essential part of their work. A good measurement system should include financial and strategic concepts for market position, innovation performance, productivity, attractiveness, liquidity/cash flow and profitability. Since hospitals need to implement a strategy to reach their business objectives, the performance measurement system has to be individually adapted to the strategy of the hospital. In this respect the navigation system developed by Gälweiler is compared to the "balanced score card" system of Kaplan and Norton. PMID:15959742

  7. NUCLEAR REACTOR CONTROL SYSTEM

    DOEpatents

    Howard, D.F.; Motta, E.E.

    1961-06-27

    A method for controlling the excess reactivity in a nuclear reactor throughout the core life while maintaining the neutron flux distribution at the desired level is described. The control unit embodies a container having two electrodes of different surface area immersed in an electrolytic solution of a good neutron sbsorbing metal ion such as boron, gadolinium, or cadmium. Initially, the neutron absorber is plated on the larger electrode to control the greater neutron flux of a freshly refueled core. As the fuel burns up, the excess reactivity decreases and the neutron absorber is then plated onto the smaller electrode so that the number of neutrons absorbed also decreases. The excess reactivity in the core may thus be maintained without the introduction of serious perturbations in the neutron flux distributibn.

  8. AUTOMATIC FREQUENCY CONTROL SYSTEM

    DOEpatents

    Hansen, C.F.; Salisbury, J.D.

    1961-01-10

    A control is described for automatically matching the frequency of a resonant cavity to that of a driving oscillator. The driving oscillator is disconnected from the cavity and a secondary oscillator is actuated in which the cavity is the frequency determining element. A low frequency is mixed with the output of the driving oscillator and the resultant lower and upper sidebands are separately derived. The frequencies of the sidebands are compared with the secondary oscillator frequency. deriving a servo control signal to adjust a tuning element in the cavity and matching the cavity frequency to that of the driving oscillator. The driving oscillator may then be connected to the cavity.

  9. 17 CFR 21.01 - Special calls for information on controlled accounts from futures commission merchants, clearing...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... on controlled accounts from futures commission merchants, clearing members and introducing brokers. 21.01 Section 21.01 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION SPECIAL CALLS § 21.01 Special calls for information on controlled accounts from futures commission...

  10. 10 CFR 74.31 - Nuclear material control and accounting for special nuclear material of low strategic significance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Nuclear material control and accounting for special nuclear material of low strategic significance. 74.31 Section 74.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Special Nuclear Material of...

  11. 10 CFR 74.41 - Nuclear material control and accounting for special nuclear material of moderate strategic...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Nuclear material control and accounting for special nuclear material of moderate strategic significance. 74.41 Section 74.41 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Special Nuclear...

  12. 10 CFR 74.31 - Nuclear material control and accounting for special nuclear material of low strategic significance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Nuclear material control and accounting for special nuclear material of low strategic significance. 74.31 Section 74.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Special Nuclear Material of...

  13. 10 CFR 74.31 - Nuclear material control and accounting for special nuclear material of low strategic significance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Nuclear material control and accounting for special nuclear material of low strategic significance. 74.31 Section 74.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Special Nuclear Material of...

  14. 10 CFR 74.41 - Nuclear material control and accounting for special nuclear material of moderate strategic...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Nuclear material control and accounting for special nuclear material of moderate strategic significance. 74.41 Section 74.41 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Special Nuclear...

  15. 10 CFR 74.41 - Nuclear material control and accounting for special nuclear material of moderate strategic...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Nuclear material control and accounting for special nuclear material of moderate strategic significance. 74.41 Section 74.41 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Special Nuclear...

  16. 10 CFR 74.33 - Nuclear material control and accounting for uranium enrichment facilities authorized to produce...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Nuclear material control and accounting for uranium enrichment facilities authorized to produce special nuclear material of low strategic significance. 74.33 Section 74.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF...

  17. 10 CFR 74.41 - Nuclear material control and accounting for special nuclear material of moderate strategic...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Nuclear material control and accounting for special nuclear material of moderate strategic significance. 74.41 Section 74.41 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Special Nuclear...

  18. 10 CFR 74.41 - Nuclear material control and accounting for special nuclear material of moderate strategic...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Nuclear material control and accounting for special nuclear material of moderate strategic significance. 74.41 Section 74.41 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Special Nuclear...

  19. 10 CFR 74.31 - Nuclear material control and accounting for special nuclear material of low strategic significance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Nuclear material control and accounting for special nuclear material of low strategic significance. 74.31 Section 74.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Special Nuclear Material of...

  20. 10 CFR 74.31 - Nuclear material control and accounting for special nuclear material of low strategic significance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Nuclear material control and accounting for special nuclear material of low strategic significance. 74.31 Section 74.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) MATERIAL CONTROL AND ACCOUNTING OF SPECIAL NUCLEAR MATERIAL Special Nuclear Material of...

  1. Power assist control of electric bicycle taking environment and rider's condition into account

    NASA Astrophysics Data System (ADS)

    Niki, Hiroshi; Miyata, Junichi; Murakami, Toshiyuki

    2005-12-01

    Recently, bicycles are widely used as a convenient transportation tool. But from a viewpoint of wide use for the future aging society, it is problem to pedal on rider's own. As well known, power assistance bicycle has already been used. The power assistance bicycle helps the elderly people or the people who has weak legs to expand their field. However, existing power assistance bicycle doesn't take running environment and rider's condition into account. The new control algorithm for power assistance bicycle is proposed in this paper. Human input and running friction are estimated as a disturbance torque with a disturbance observer. By using high pass filter (HPF), human input is separated from running friction. This method realizes power assistance bicycle without torque sensor. Disturbance observer compensates running friction. Compliance control is applied to make the bicycle have desired compliance. The effectiveness of this control algorithm is verified by numerical and experimental results.

  2. The APS control system network

    SciTech Connect

    Sidorowicz, K.V.; McDowell, W.P.

    1995-12-31

    The APS accelerator control system is a distributed system consisting of operator interfaces, a network, and computer-controlled interfaces to hardware. This implementation of a control system has come to be called the {open_quotes}Standard Model.{close_quotes} The operator interface is a UNDC-based workstation with an X-windows graphical user interface. The workstation may be located at any point on the facility network and maintain full functionality. The function of the network is to provide a generalized communication path between the host computers, operator workstations, input/output crates, and other hardware that comprise the control system. The crate or input/output controller (IOC) provides direct control and input/output interfaces for each accelerator subsystem. The network is an integral part of all modem control systems and network performance will determine many characteristics of a control system. This paper will describe the overall APS network and examine the APS control system network in detail. Metrics are provided on the performance of the system under various conditions.

  3. The Inclusion of Students with Disabilities in School Accountability Systems: An Update. NCEE 2013-4017

    ERIC Educational Resources Information Center

    Harr-Robins, Jenifer; Song, Mengli; Hurlburt, Steven; Pruce, Cheryl; Danielson, Louis; Garet, Michael

    2013-01-01

    Formerly excluded from measures of educational performance, students with disabilities (SWDs) are now explicitly recognized in federal and state accountability systems. At the national level, the 1997 amendments to the Individuals with Disabilities Education Act (IDEA) laid the foundation for accountability for SWDs by requiring states to include…

  4. 41 CFR 301-71.1 - What is the purpose of an agency travel accounting system?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... data necessary for the management of official travel; and (c) Ensure adequate accounting for all travel... 41 Public Contracts and Property Management 4 2011-07-01 2011-07-01 false What is the purpose of an agency travel accounting system? 301-71.1 Section 301-71.1 Public Contracts and...

  5. 41 CFR 301-71.1 - What is the purpose of an agency travel accounting system?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... data necessary for the management of official travel; and (c) Ensure adequate accounting for all travel... 41 Public Contracts and Property Management 4 2014-07-01 2014-07-01 false What is the purpose of an agency travel accounting system? 301-71.1 Section 301-71.1 Public Contracts and...

  6. 41 CFR 301-71.1 - What is the purpose of an agency travel accounting system?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... data necessary for the management of official travel; and (c) Ensure adequate accounting for all travel... 41 Public Contracts and Property Management 4 2012-07-01 2012-07-01 false What is the purpose of an agency travel accounting system? 301-71.1 Section 301-71.1 Public Contracts and...

  7. 41 CFR 301-71.1 - What is the purpose of an agency travel accounting system?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... data necessary for the management of official travel; and (c) Ensure adequate accounting for all travel... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What is the purpose of an agency travel accounting system? 301-71.1 Section 301-71.1 Public Contracts and...

  8. 41 CFR 301-71.1 - What is the purpose of an agency travel accounting system?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 4 2013-07-01 2012-07-01 true What is the purpose of an agency travel accounting system? 301-71.1 Section 301-71.1 Public Contracts and Property Management... necessary for the management of official travel; and (c) Ensure adequate accounting for all travel...

  9. Measure for Measure: How Proficiency-Based Accountability Systems Affect Inequality in Academic Achievement

    ERIC Educational Resources Information Center

    Jennings, Jennifer; Sohn, Heeju

    2014-01-01

    How do proficiency-based accountability systems affect inequality in academic achievement? This article reconciles mixed findings in the literature by demonstrating that three factors jointly determine accountability's impact. First, by analyzing student-level data from a large urban school district, we find that when educators face…

  10. As Easy as ABC: Re-engineering the Cost Accounting System.

    ERIC Educational Resources Information Center

    Trussel, John M.; Bitner, Larry N.

    1996-01-01

    To be useful for management decision making, the college or university's cost accounting system must capture and measure improvements. Activity-based costing (ABC), which determines more accurately the full costs of services and products, tracks improvements and should proceed alongside reengineering of institutional accounting. Guidelines are…

  11. Update: New Federal Financial Accounting for State and Local School Systems Due Out Soon.

    ERIC Educational Resources Information Center

    Sielke, Catherine C.

    2002-01-01

    Reports on several changes in the 2002 edition (forthcoming) of the federal government accounting handbook "Federal Financial Accounting for State and Local School Systems." Includes brief summary of "Emerging Issues" section of the handbook that addresses issues such as alternative revenues, charter schools, school safety and security,…

  12. A network identity authentication protocol of bank account system based on fingerprint identification and mixed encryption

    NASA Astrophysics Data System (ADS)

    Zhu, Lijuan; Liu, Jingao

    2013-07-01

    This paper describes a network identity authentication protocol of bank account system based on fingerprint identification and mixed encryption. This protocol can provide every bank user a safe and effective way to manage his own bank account, and also can effectively prevent the hacker attacks and bank clerk crime, so that it is absolute to guarantee the legitimate rights and interests of bank users.

  13. Accountability and a Systems Approach to Marital Counseling in the University.

    ERIC Educational Resources Information Center

    Paulson, Donald L., Jr.

    The purpose of this paper was to bring together the concept of educational accountability and a systems approach to delivering marital counseling services to a university community. In so doing a heavy emphasis was placed on outliving the basic assumptions underlying the current movement for educational accountability and presenting one, very…

  14. "Catalyst Data": Perverse Systemic Effects of Audit and Accountability in Australian Schooling

    ERIC Educational Resources Information Center

    Lingard, Bob; Sellar, Sam

    2013-01-01

    This paper examines the perverse effects of the new accountability regime central to the Labor government's national reform agenda in schooling. The focus is on National Assessment Program -- Literacy and Numeracy (NAPLAN) results that now act as "catalyst data" and are pivotal to school and system accountability. We offer a case…

  15. The Influence of Socioeconomic Factors on Kentucky's Public School Accountability System: Does Poverty Impact School Effectiveness?

    ERIC Educational Resources Information Center

    Lyons, Robert

    2004-01-01

    Under the Commonwealth Accountability Testing System (CATS), Kentucky's public schools have been assigned individualized "baseline" and "improvement goal" indices based upon past school performance in relation to the 2014 statewide index goal of 100. Each school's CATS Accountability Index, a measure of school performance based upon both cognitive…

  16. Financial and Managerial Accounting for Elementary and Secondary School Systems. Third Edition.

    ERIC Educational Resources Information Center

    Tidwell, Sam B.

    This book describes recent improvements in governmental accounting, auditing, and financial reporting for school business officials. Applications of financial accounting and reporting principles in typical transactions of school systems are illustrated by questions, cases, and problems at the end of each chapter. The first of the two sections,…

  17. Advanced flight control system study

    NASA Technical Reports Server (NTRS)

    Mcgough, J.; Moses, K.; Klafin, J. F.

    1982-01-01

    The architecture, requirements, and system elements of an ultrareliable, advanced flight control system are described. The basic criteria are functional reliability of 10 to the minus 10 power/hour of flight and only 6 month scheduled maintenance. A distributed system architecture is described, including a multiplexed communication system, reliable bus controller, the use of skewed sensor arrays, and actuator interfaces. Test bed and flight evaluation program are proposed.

  18. Dual pressure displacement control system

    SciTech Connect

    Louis, J.E.; Klocke, C.C.

    1988-02-02

    This patent describes a dual pressure servo control system for a variable displacement hydraulic unit having displacement setting means positioned by a hydraulic servo mechanism. The hydraulic unit is provided with main loop lines at least one of which is capable of being subjected to high main loop pressure during operation of the hydraulic unit, a control line including a displacement control valve providing a controlled flow of fluid under pressure to the servo mechanism, and a source of fluid under pressure for the control line comprising a low pressure source connected to the control line through a check valve and high pressure source comprising of a high pressure control line connected to the control line downstream of the check valve. The high pressure control line includes a flow restriction limiting flow to the control line means and generating a significant flow induced pressure drop in the high pressure control line once movement in the servo mechanism is initiated.

  19. Controlling hydraulic system costs

    SciTech Connect

    Smiley, C.H.

    1982-06-01

    Hydraulic system preventive maintenance is largely a matter of using the senses and common logic to spot signs of impending problems. The ability to recognize a potential malfunction can save a great deal of money in repairs and lost production.

  20. Dynamically controlled crystal growth system

    NASA Technical Reports Server (NTRS)

    Bray, Terry L. (Inventor); Kim, Larry J. (Inventor); Harrington, Michael (Inventor); DeLucas, Lawrence J. (Inventor)

    2002-01-01

    Crystal growth can be initiated and controlled by dynamically controlled vapor diffusion or temperature change. In one aspect, the present invention uses a precisely controlled vapor diffusion approach to monitor and control protein crystal growth. The system utilizes a humidity sensor and various interfaces under computer control to effect virtually any evaporation rate from a number of different growth solutions simultaneously by means of an evaporative gas flow. A static laser light scattering sensor can be used to detect aggregation events and trigger a change in the evaporation rate for a growth solution. A control/follower configuration can be used to actively monitor one chamber and accurately control replicate chambers relative to the control chamber. In a second aspect, the invention exploits the varying solubility of proteins versus temperature to control the growth of protein crystals. This system contains miniature thermoelectric devices under microcomputer control that change temperature as needed to grow crystals of a given protein. Complex temperature ramps are possible using this approach. A static laser light scattering probe also can be used in this system as a non-invasive probe for detection of aggregation events. The automated dynamic control system provides systematic and predictable responses with regard to crystal size. These systems can be used for microgravity crystallization projects, for example in a space shuttle, and for crystallization work under terrestial conditions. The present invention is particularly useful for macromolecular crystallization, e.g. for proteins, polypeptides, nucleic acids, viruses and virus particles.

  1. 19 CFR 19.12 - Inventory control and recordkeeping system.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Inventory control and recordkeeping system. 19.12 Section 19.12 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CUSTOMS WAREHOUSES, CONTAINER STATIONS AND CONTROL OF MERCHANDISE THEREIN Accounts § 19.12 Inventory control...

  2. Management of Control System Information SecurityI: Control System Patch Management

    SciTech Connect

    Quanyan Zhu; Miles McQueen; Craig Rieger; Tamer Basar

    2011-09-01

    The use of information technologies in control systems poses additional potential threats due to the frequent disclosure of software vulnerabilities. The management of information security involves a series of policy-making on the vulnerability discovery, disclosure, patch development and patching. In this paper, we use a system approach to devise a model to understand the interdependencies of these decision processes. In more details, we establish a theoretical framework for making patching decision for control systems, taking into account the requirement of functionability of control systems. We illustrate our results with numerical simulations and show that the optimal operation period of control systems given the currently estimated attack rate is roughly around a half a month.

  3. Accounting for parameter uncertainty in reduced-order static and dynamic systems

    NASA Astrophysics Data System (ADS)

    Woodbury, Drew Patton

    Parametric uncertainty is one of many possible causes of divergence for the Kalman filter. Frequently, state estimation errors caused by imperfect model parameters are reduced by including the uncertain parameters as states (i.e., augmenting the state vector). For many situations, this not only improves the state estimates, but also improves the accuracy and precision of the parameters themselves. Unfortunately, not all filters benefit from this augmentation due to computational restrictions or because the parameters are poorly observable. A parameter with low observability (e.g., a set of high order gravity coefficients, a set of camera offsets, lens calibration controls, etc.) may not acquire enough measurements along a particular trajectory to improve the parameter's accuracy, which can cause detrimental effects in the performance of the augmented filter. The problem is then how to reduce the dimension of the augmented state vector while minimizing information loss. This dissertation explored possible implementations of reduced-order filters which decrease computational loads while also minimizing state estimation errors. A theoretically rigorous approach using the "consider" methodology was taken first to static, or algebraic, systems and then the theory was expanded to include dynamic models. Methods for discrete, continuous, and continuous dynamic system models measured at discrete time intervals were explored for linear systems. The continuous dynamics, discretely measured (continuous-discrete) model was also expanded for use with nonlinear systems. Additional techniques for reduced-order filtering are presented including the use of additive process noise, an alternative consider derivation, and the minimum variance reduced-order filter. Multiple simulation examples are provided to help explain critical concepts. Finally, two hardware applications are also included to show the validity of the theory for real world applications. It was shown that the minimum

  4. Control systems on Lie groups.

    NASA Technical Reports Server (NTRS)

    Jurdjevic, V.; Sussmann, H. J.

    1972-01-01

    The controllability properties of systems which are described by an evolution equation in a Lie group are studied. The revelant Lie algebras induced by a right invariant system are singled out, and the basic properties of attainable sets are derived. The homogeneous case and the general case are studied, and results are interpreted in terms of controllability. Five examples are given.

  5. Virtual Control Systems Environment (VCSE)

    SciTech Connect

    Atkins, Will

    2012-10-08

    Will Atkins, a Sandia National Laboratories computer engineer discusses cybersecurity research work for process control systems. Will explains his work on the Virtual Control Systems Environment project to develop a modeling and simulation framework of the U.S. electric grid in order to study and mitigate possible cyberattacks on infrastructure.

  6. Virtual Control Systems Environment (VCSE)

    ScienceCinema

    Atkins, Will

    2014-02-26

    Will Atkins, a Sandia National Laboratories computer engineer discusses cybersecurity research work for process control systems. Will explains his work on the Virtual Control Systems Environment project to develop a modeling and simulation framework of the U.S. electric grid in order to study and mitigate possible cyberattacks on infrastructure.

  7. Case-control geographic clustering for residential histories accounting for risk factors and covariates

    PubMed Central

    2006-01-01

    Background Methods for analyzing space-time variation in risk in case-control studies typically ignore residential mobility. We develop an approach for analyzing case-control data for mobile individuals and apply it to study bladder cancer in 11 counties in southeastern Michigan. At this time data collection is incomplete and no inferences should be drawn – we analyze these data to demonstrate the novel methods. Global, local and focused clustering of residential histories for 219 cases and 437 controls is quantified using time-dependent nearest neighbor relationships. Business address histories for 268 industries that release known or suspected bladder cancer carcinogens are analyzed. A logistic model accounting for smoking, gender, age, race and education specifies the probability of being a case, and is incorporated into the cluster randomization procedures. Sensitivity of clustering to definition of the proximity metric is assessed for 1 to 75 k nearest neighbors. Results Global clustering is partly explained by the covariates but remains statistically significant at 12 of the 14 levels of k considered. After accounting for the covariates 26 Local clusters are found in Lapeer, Ingham, Oakland and Jackson counties, with the clusters in Ingham and Oakland counties appearing in 1950 and persisting to the present. Statistically significant focused clusters are found about the business address histories of 22 industries located in Oakland (19 clusters), Ingham (2) and Jackson (1) counties. Clusters in central and southeastern Oakland County appear in the 1930's and persist to the present day. Conclusion These methods provide a systematic approach for evaluating a series of increasingly realistic alternative hypotheses regarding the sources of excess risk. So long as selection of cases and controls is population-based and not geographically biased, these tools can provide insights into geographic risk factors that were not specifically assessed in the case-control

  8. Control systems for Coline accelerators

    NASA Astrophysics Data System (ADS)

    Baczewski, Artur; Latała, Agata; Ceglińska, Kaja; Andrasiak, Michał

    2008-01-01

    Medical linear accelerators are the largest group of devices for therapy of cancer diseases because of their compact design, relatively low operating costs, advanced features and broad range of treatment procedures. Their reliability and ease of operation are very important but the most crucial is to ensure personnel and patient safety. For this reason the development of control and safety systems is the current "leading edge" in medical linear accelerators technology. Provided internal monitoring, machine control and steering, interlock system as well as the automatic recording of the device and patient parameters are nowadays fully controlled by the computer. This paper describes in details projects connected to advanced development of Coline accelerators. As it is crucial to assure reliable steering and monitoring of all the machine settings and actual dose delivered to the patient, advanced control systems composed of steering, control and interlock systems, communication protocol as well as data management system have been developed.

  9. A Dynamic Simulation Model of the Management Accounting Information Systems (MAIS)

    NASA Astrophysics Data System (ADS)

    Konstantopoulos, Nikolaos; Bekiaris, Michail G.; Zounta, Stella

    2007-12-01

    The aim of this paper is to examine the factors which determine the problems and the advantages on the design of management accounting information systems (MAIS). A simulation is carried out with a dynamic model of the MAIS design.

  10. CENTRAL CONTROL SYSTEM

    DOEpatents

    Borst, L.B.

    1959-09-22

    A control element is presented for neutronic reactors. The element is longitudinally expansible and compressible and remains within the reactor core at all times. The effectiveness of the element as to neutron absorption is varied by longitudinally compressing or expanding the element, the effectiveness being greatest when the element is fullv expanded and least when it is fully compressed. Two embodiments of the invention are described, one being a coiled spring and the other being an element formed from a plurality of interconnected links.

  11. Financial Management: Overall Plan Needed To Guide System Improvements at Education. United States General Accounting Office Report to the Secretary of Education.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC.

    The U.S. Department of Education's financial management environment and effectiveness are described, together with the reliability of its accounting and internal control systems for the management of the money it gives or lends to schools, individual students, states, and local education agencies. The study found that key accounting and related…

  12. Operating System For Numerically Controlled Milling Machine

    NASA Technical Reports Server (NTRS)

    Ray, R. B.

    1992-01-01

    OPMILL program is operating system for Kearney and Trecker milling machine providing fast easy way to program manufacture of machine parts with IBM-compatible personal computer. Gives machinist "equation plotter" feature, which plots equations that define movements and converts equations to milling-machine-controlling program moving cutter along defined path. System includes tool-manager software handling up to 25 tools and automatically adjusts to account for each tool. Developed on IBM PS/2 computer running DOS 3.3 with 1 MB of random-access memory.

  13. Aircraft control system

    NASA Technical Reports Server (NTRS)

    Lisoski, Derek L. (Inventor); Kendall, Greg T. (Inventor)

    2007-01-01

    A solar rechargeable, long-duration, span-loaded flying wing, having no fuselage or rudder. Having a two-hundred foot wingspan that mounts photovoltaic cells on most all of the wing's top surface, the aircraft uses only differential thrust of its eight propellers to turn, pitch and yaw. The wing is configured to deform under flight loads to position the propellers such that the control can be achieved. Each of five segments of the wing has one or more motors and photovoltaic arrays, and produces its own lift independent of the other segments, to avoid loading them. Five two-sided photovoltaic arrays, in all, are mounted on the wing, and receive photovoltaic energy both incident on top of the wing, and which is incident also from below, through a bottom, transparent surface.

  14. Systems Approach to Arms Control Verification

    SciTech Connect

    Allen, K; Neimeyer, I; Listner, C; Stein, G; Chen, C; Dreicer, M

    2015-05-15

    Using the decades of experience of developing concepts and technologies for verifying bilateral and multilateral arms control agreements, a broad conceptual systems approach is being developed that takes into account varying levels of information and risk. The IAEA has already demonstrated the applicability of a systems approach by implementing safeguards at the State level, with acquisition path analysis as the key element. In order to test whether such an approach could also be implemented for arms control verification, an exercise was conducted in November 2014 at the JRC ITU Ispra. Based on the scenario of a hypothetical treaty between two model nuclear weapons states aimed at capping their nuclear arsenals at existing levels, the goal of this exercise was to explore how to use acquisition path analysis in an arms control context. Our contribution will present the scenario, objectives and results of this exercise, and attempt to define future workshops aimed at further developing verification measures that will deter or detect treaty violations.

  15. Pathological gamblers and a non-psychiatric control group taking gender differences into account.

    PubMed

    Echeburúa, Enrique; González-Ortega, Itxaso; de Corral, Paz; Polo-López, Rocío

    2013-01-01

    The current study aimed to identify personality traits, emotional states and adjustment variables in a sample of pathological gamblers as compared to a non-gambling control group taking gender differences into account. The sample for this study consisted of 206 subjects (103 pathological gamblers and 103 non-psychiatric subjects from the general population matched for age and gender). Pathological gamblers had a lower educational level and a family history of alcohol abuse higher than non-gamblers. In turn, female gamblers were affected by unemployment and a lower socioeconomic status more often than female non-gamblers. Pathological gamblers were more anxious and impulsive and suffered from a poorer self-esteem than non-gamblers. Likewise, pathological gamblers had a greater history of other Axis I psychiatric disorders and were more often affected by anxiety and depression symptoms and showed a more problematic adjustment to everyday life than non-gamblers. Alcohol abuse was not higher in pathological gamblers than in non-gamblers, but, when gender was taken into account, male gamblers were more affected by alcohol abuse than male non-gamblers. Importantly 68.6% of female gamblers versus 9.8% of control group women reported being victims of intimate partner violence. These findings can be used to specifically inform prevention and intervention efforts. PMID:23866213

  16. Adaptable state based control system

    NASA Technical Reports Server (NTRS)

    Rasmussen, Robert D. (Inventor); Dvorak, Daniel L. (Inventor); Gostelow, Kim P. (Inventor); Starbird, Thomas W. (Inventor); Gat, Erann (Inventor); Chien, Steve Ankuo (Inventor); Keller, Robert M. (Inventor)

    2004-01-01

    An autonomous controller, comprised of a state knowledge manager, a control executor, hardware proxies and a statistical estimator collaborates with a goal elaborator, with which it shares common models of the behavior of the system and the controller. The elaborator uses the common models to generate from temporally indeterminate sets of goals, executable goals to be executed by the controller. The controller may be updated to operate in a different system or environment than that for which it was originally designed by the replacement of shared statistical models and by the instantiation of a new set of state variable objects derived from a state variable class. The adaptation of the controller does not require substantial modification of the goal elaborator for its application to the new system or environment.

  17. Integrated Aeropropulsion Control System Design

    NASA Technical Reports Server (NTRS)

    Lin, C. -F.; Hurley, Francis X.; Huang, Jie; Hadaegh, F. Y.

    1996-01-01

    %T Integrated Aeropropulsion Control System Design%A C-F. Lin%A Francis X. Hurley%A Jie Huang%A F. Y. Hadaegh%J International Conference on Control and Information(psi)995%C Hong Kong%D June 1995%K aeropropulsion, control, system%U http://jpltrs.jpl.nasa.gov/1995/95-0658.pdfAn integrated intelligent control approach is proposed to design a high performance control system for aeropropulsion systems based on advanced sensor processing, nonlinear control and neural fuzzy control integration. Our approach features the following innovations:??e complexity and uncertainty issues are addressed via the distributed parallel processing, learning, and online reoptimization properties of neural networks.??e nonlinear dynamics and the severe coupling can be naturally incorporated into the design framework.??e knowledge base and decision making logic furnished by fuzzy systems leads to a human intelligence enhanced control scheme.In addition, fault tolerance, health monitoring and reconfigurable control strategies will be accommodated by this approach to ensure stability, graceful degradation and reoptimization in the case of failures, malfunctions and damage.!.

  18. Control theory for random systems

    NASA Technical Reports Server (NTRS)

    Bryson, A. E., Jr.

    1972-01-01

    A survey is presented of the current knowledge available for designing and predicting the effectiveness of controllers for dynamic systems which can be modeled by ordinary differential equations. A short discussion of feedback control is followed by a description of deterministic controller design and the concept of system state. The need for more realistic disturbance models led to the use of stochastic process concepts, in particular the Gauss-Markov process. A compensator controlled system, with random forcing functions, random errors in the measurements, and random initial conditions, is treated as constituting a Gauss-Markov random process; hence the mean-square behavior of the controlled system is readily predicted. As an example, a compensator is designed for a helicopter to maintain it in hover in a gusty wind over a point on the ground.

  19. Emission control system

    NASA Technical Reports Server (NTRS)

    Parrish, Clyde F. (Inventor)

    2008-01-01

    Methods and apparatus utilizing hydrogen peroxide are useful to reduce NOx, SOx and mercury (or other heavy metal) emissions from combustion flue gas streams. Continuous concentration of hydrogen peroxide to levels approaching or exceeding propellant-grade hydrogen peroxide facilitates increased system efficiency. In this manner, combustion flue gas streams can be treated for the removal of NOx, SOx and heavy metals, while isolating useful by-products streams of sulfuric acid and nitric acid as well as solids for the recovery of the heavy metals.

  20. Manual control of unstable systems

    NASA Technical Reports Server (NTRS)

    Allen, R. W.; Hogue, J. R.; Parseghian, Z.

    1986-01-01

    Under certain operational regimes and failure modes, air and ground vehicles can present the human operator with a dynamically unstable or divergent control task. Research conducted over the last two decades has explored the ability of the human operator to control unstable systems under a variety of circumstances. Past research is reviewed and human operator control capabilities are summarized. A current example of automobile directional control under rear brake lockup conditions is also reviewed. A control system model analysis of the driver's steering control task is summarized, based on a generic driver/vehicle model presented at last year's Annual Manual. Results from closed course braking tests are presented that confirm the difficulty the average driver has in controlling the unstable directional dynamics arising from rear wheel lockup.

  1. An Accountability Technique in Higher Education: The Role of Planning, Programming, Budgeting and Evaluation System (PPBES).

    ERIC Educational Resources Information Center

    Wesolowski, Zdzislaw P.

    In response to the demand for accountability in higher education, colleges have adopted business techniques of planning and management systems in the form of Planning, Programming, Budgeting, and Evaluation System (PPBES). The system approach to educational administration consists of three interrelated concepts: (1) input, (2) process, and (3)…

  2. 40 CFR 96.52 - NOX Allowance Tracking System responsibilities of NOX authorized account representative.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false NOX Allowance Tracking System... SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS NOX Allowance Tracking System § 96.52 NOX Allowance Tracking System responsibilities of NOX authorized account representative. (a) Following...

  3. 40 CFR 96.52 - NOX Allowance Tracking System responsibilities of NOX authorized account representative.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false NOX Allowance Tracking System... SO 2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS NOX Allowance Tracking System § 96.52 NOX Allowance Tracking System responsibilities of NOX authorized account representative. (a) Following...

  4. 40 CFR 96.52 - NOX Allowance Tracking System responsibilities of NOX authorized account representative.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false NOX Allowance Tracking System... SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS NOX Allowance Tracking System § 96.52 NOX Allowance Tracking System responsibilities of NOX authorized account representative. (a) Following...

  5. Deposition System Controller

    SciTech Connect

    Conley, Ray; Liu, Chian

    2005-10-01

    This software is a complete thin film deposition controller. The software takes as its input a script file that dictates enablinig/disabling of sputtering power supplies, pause times, velocities and distances to move a substrate. An emulator has been created and built into the software package that can debug in advance any deposition script and decide if there is an overrun condition, accidental infinite look, and can estimate a time for completion. All necessary process variables are data logged and recorded for later inspection. This emulator currently interfaces to a Parker-Compumotor SX6 stepper moror indexer, but the software is written in such a way that it is easily modifiable for interface to othe brand and models of motor drivers. Other process I/O variables may be easily added. The software uses any multifunction DAQ card from National Instruments via their free NIDAQ API package, but again, the software is written such that othe brand DAQ cards may be used.

  6. Automatic engine control system

    SciTech Connect

    Geary, W.C.; Mirsaiidi, M.V.; Redfern, T.; Wolfe, D.W.

    1986-01-14

    This patent describes an automatic control circuit for an internal combustion engine and clutch assembly. One component of this circuit is a timer for determining the time the engine is allowed to run and the clutch is engaged and a second period of time when the clutch is automatically disengaged. Associated with the timer is a starter means to start the engine during the first time period and a clutch actuating mechanism for engaging the clutch near the first time period initiation after the starter starts the engine. An engine shut down and clutch disengagement mechanism is also responsive to the first timer. The patent then goes on to describe a supplemental timer mechanism for determining a third and fourth period of time within the second time period such that the third period being when the engine is shut off and the fourth period being when the engine runs with clutch disengaged. The starter mechanism is responsive to the supplemental timer to start the engine at the beginning of the fourth period. A shut down means stops the engine at the beginning of the third period in response to the timer.

  7. Deposition System Controller

    2005-10-01

    This software is a complete thin film deposition controller. The software takes as its input a script file that dictates enablinig/disabling of sputtering power supplies, pause times, velocities and distances to move a substrate. An emulator has been created and built into the software package that can debug in advance any deposition script and decide if there is an overrun condition, accidental infinite look, and can estimate a time for completion. All necessary process variablesmore » are data logged and recorded for later inspection. This emulator currently interfaces to a Parker-Compumotor SX6 stepper moror indexer, but the software is written in such a way that it is easily modifiable for interface to othe brand and models of motor drivers. Other process I/O variables may be easily added. The software uses any multifunction DAQ card from National Instruments via their free NIDAQ API package, but again, the software is written such that othe brand DAQ cards may be used.« less

  8. Commutated automatic gain control system

    NASA Technical Reports Server (NTRS)

    Yost, S. R.

    1982-01-01

    The commutated automatic gain control (AGC) system was designed and built for the prototype Loran-C receiver is discussed. The current version of the prototype receiver, the Mini L-80, was tested initially in 1980. The receiver uses a super jolt microcomputer to control a memory aided phase loop (MAPLL). The microcomputer also controls the input/output, latitude/longitude conversion, and the recently added AGC system. The AGC control adjusts the level of each station signal, such that the early portion of each envelope rise is about at the same amplitude in the receiver envelope detector.

  9. An Operator Perspective from a Facility Evaluation of an RFID-Based UF6 Cylinder Accounting and Tracking System

    SciTech Connect

    Martyn, Rose; Fitzgerald, Peter; Stehle, Nicholas D; Rowe, Nathan C; Younkin, James R

    2011-01-01

    An operational field test of a Radio-Frequency Identification (RFID) system for tracking and accounting UF6 cylinders was conducted at the Global Nuclear Fuel Americas (GNF) fuel fabrication plant in 2009. The Cylinder Accountability and Tracking System (CATS) was designed and deployed by Oak Ridge National Laboratory (ORNL) and evaluated in cooperation with GNF. The system required that passive RFID be attached to several UF6 30B cylinders as they were received at the site; then the cylinders were tracked as they proceeded to interim storage, to processing in an autoclave, and eventually to disposition from the site. This CATS deployment also provided a direct integration of scale data from the site accountability scales. The integration of this information into the tracking data provided an attribute for additional safeguards for evaluation. The field test provided insight into the advantages and challenges of using RFID at an operating nuclear facility. The RFID system allowed operators to interact with the technology and demonstrated the survivability of the tags and reader equipment in the process environment. This paper will provide the operator perspective on utilizing RFID technology for locating cylinders within the facility, thereby tracking the cylinders for process and for Material Control & Accounting functions. The paper also will present the operator viewpoint on RFID implemented as an independent safeguards system.

  10. Emission control system

    NASA Technical Reports Server (NTRS)

    Parrish, Clyde F. (Inventor); Chung, J. Landy (Inventor)

    2009-01-01

    Methods and apparatus utilizing hydrogen peroxide are useful to reduce SOx and mercury (or other heavy metal) emissions from combustion flue gas streams. The methods and apparatus may further be modified to reduce NOx emissions. Continuous concentration of hydrogen peroxide to levels approaching or exceeding propellant-grade hydrogen peroxide facilitates increased system efficiency. In this manner, combustion flue gas streams can be treated for the removal of SOx and heavy metals, while isolating useful by-products streams of sulfuric acid as well as solids for the recovery of the heavy metals. Where removal of NOx emissions is included, nitric acid may also be isolated for use in fertilizer or other industrial applications.

  11. Safeguards Material Control and Accounting Program. Quarterly report, April-June 1980

    SciTech Connect

    Poggio, A.J.; Dunn, D.R.

    1980-12-01

    This report summarizes the April-June 1980 activities of the Safeguards Material and Accounting Program sponsored by the US Nuclear Regulatory Commission (NRC) at the Lawrence Livermore National Laboratory. Progress is described on the application and further development of computer-based methodologies for assessing the vulnerabilities of MC and A systems in nuclear fuel-cycle facilities. The application effort involved an assessment of a scrap processing facility with the Structured Assessment Approach (SAA) methodology. The development effort concentrated on making the SAA more user-oriented. Work continued in providing technical analyses to assist the NRC in its development of the forthcoming MC and A upgrade rule. The technical analyses have involved value-impact studies on the draft MC and A upgrade rule using the LLNL Aggregrated Systems Model; specifically, progress has been made on the development of five MC and A performance measures. Other work has included the development of four protection principles for protecting MC and A data from falsification. We also describe progress in analyzing the actual and potential value of an NRC interfacility material accounting system for detecting data falsification.

  12. Structural interaction with control systems

    NASA Technical Reports Server (NTRS)

    Noll, R. B.; Zvara, J.

    1971-01-01

    A monograph which assesses the state of the art of space vehicle design and development is presented. The monograph presents criteria and recommended practices for determining the structural data and a mathematical structural model of the vehicle needed for accurate prediction of structure and control-system interaction; for design to minimize undesirable interactions between the structure and the control system; and for determining techniques to achieve the maximum desirable interactions and associated structural design benefits. All space vehicles are treated, including launch vehicles, spacecraft, and entry vehicles. Important structural characteristics which affect the structural model used for structural and control-system interaction analysis are given.

  13. The AMSC network control system

    NASA Technical Reports Server (NTRS)

    Garner, William B.

    1990-01-01

    The American Mobile Satellite Corporation (AMSC) is going to construct, launch, and operate a satellite system in order to provide mobile satellite services to the United States. AMSC is going to build, own, and operate a Network Control System (NCS) for managing the communications usage of the satellites, and to control circuit switched access between mobile earth terminals and feeder-link earth stations. An overview of the major NCS functional and performance requirements, the control system physical architecture, and the logical architecture is provided.

  14. Control of Initialized Fractional-Order Systems

    NASA Technical Reports Server (NTRS)

    Hartly, Tom T.; Lorenzo, Carl F.

    2002-01-01

    Due to the importance of historical effects in fractional-order systems, this paper presents a general fractional-order control theory that includes the time-varying initialization response. Previous studies have not properly accounted for these historical effects. The initialization response, along with the forced response, for fractional-order systems is determined. Stability properties of fractional-order systems are presented in the complex Airplane, which is a transformation of the s-plane. Time responses are discussed with respect to pole positions in the complex Airplane and frequency response behavior is included. A fractional-order vector space representation, which is a generalization of the state space concept, is presented including the initialization response. Control methods for vector representations of initialized fractional-order systems are shown. Nyquist, root-locus, and other input-output control methods are adapted to the control of fractional-order systems. Finally, the fractional-order differintegral is generalized to continuous order-distributions that have the possibility of including a continuum of fractional orders in a system element.

  15. MULTIPLE ECH LAUNCHER CONTROL SYSTEM

    SciTech Connect

    GREEN,M.T; PONCE,D; GRUNLOH,H.J; ELLIS,R.A; GROSNICKLE,W.H; HUMPHREY,R.L

    2003-10-01

    OAK-B135 The addition of new, high power gyrotrons to the heating and current drive arsenal at DIII-D, required a system upgrade for control of fully steerable ECH Launchers. Each launcher contains two pointing mirrors with two degrees of mechanical freedom. The two flavors of motion are called facet and tilt. Therefore up to four channels of motion per launcher need to be controlled. The system utilizes absolute encoders to indicate mirror position and therefore direction of the microwave beam. The launcher movement is primarily controlled by PLC, but future iterations of design, may require this control to be accomplished by a CPU on fast bus such as Compact PCI. This will be necessary to accomplish real time position control. Safety of equipment and personnel is of primary importance when controlling a system of moving parts. Therefore multiple interlocks and fault status enunciators have been implemented. This paper addresses the design of a Multiple ECH Launcher Control System, and characterizes the flexibility needed to upgrade to a real time position control system in the future.

  16. Nanoscale control designs for systems.

    PubMed

    Chen, Yung-Yue

    2014-02-01

    Nanoscale control is the science of the control of objects at dimensions with 100 nm or less and the manipulation of them at this level of precision. The desired attributes of systems under nanoscale control design are extreme high resolution, accuracy, stability, and fast response. An important perspective of investigation in nanoscale control design includes system modeling and precision control devices and materials at a nanoscale dimension, i.e., design of nanopositioners. Nanopositioners are mechatronic systems with an ultraprecise resolution down to a fraction of an atomic diameter and developed to move objects over a small range in nanoscale dimension. After reviewing a lot of existing literatures for nanoscale control designs, the way to successful nanoscale control is accurate position sensing and feedback control of the motion. An overview of nanoscale identification, linear, and nonlinear control technologies, and devices that are playing a key role in improving precision, accuracy, and response of operation of these systems are introduced in this research. PMID:24749455

  17. Weld analysis and control system

    NASA Technical Reports Server (NTRS)

    Kennedy, Larry Z. (Inventor); Rodgers, Michael H. (Inventor); Powell, Bradley W. (Inventor); Burroughs, Ivan A. (Inventor); Goode, K. Wayne (Inventor)

    1994-01-01

    The invention is a Weld Analysis and Control System developed for active weld system control through real time weld data acquisition. Closed-loop control is based on analysis of weld system parameters and weld geometry. The system is adapted for use with automated welding apparatus having a weld controller which is capable of active electronic control of all aspects of a welding operation. Enhanced graphics and data displays are provided for post-weld analysis. The system provides parameter acquisition, including seam location which is acquired for active torch cross-seam positioning. Torch stand-off is also monitored for control. Weld bead and parent surface geometrical parameters are acquired as an indication of weld quality. These parameters include mismatch, peaking, undercut, underfill, crown height, weld width, puddle diameter, and other measurable information about the weld puddle regions, such as puddle symmetry, etc. These parameters provide a basis for active control as well as post-weld quality analysis and verification. Weld system parameters, such as voltage, current and wire feed rate, are also monitored and archived for correlation with quality parameters.

  18. Comparison of automatic control systems

    NASA Technical Reports Server (NTRS)

    Oppelt, W

    1941-01-01

    This report deals with a reciprocal comparison of an automatic pressure control, an automatic rpm control, an automatic temperature control, and an automatic directional control. It shows the difference between the "faultproof" regulator and the actual regulator which is subject to faults, and develops this difference as far as possible in a parallel manner with regard to the control systems under consideration. Such as analysis affords, particularly in its extension to the faults of the actual regulator, a deep insight into the mechanism of the regulator process.

  19. Position feedback control system

    DOEpatents

    Bieg, Lothar F.; Jokiel, Jr., Bernhard; Ensz, Mark T.; Watson, Robert D.

    2003-01-01

    Disclosed is a system and method for independently evaluating the spatial positional performance of a machine having a movable member, comprising an articulated coordinate measuring machine comprising: a first revolute joint; a probe arm, having a proximal end rigidly attached to the first joint, and having a distal end with a probe tip attached thereto, wherein the probe tip is pivotally mounted to the movable machine member; a second revolute joint; a first support arm serially connecting the first joint to the second joint; and coordinate processing means, operatively connected to the first and second revolute joints, for calculating the spatial coordinates of the probe tip; means for kinematically constraining the articulated coordinate measuring machine to a working surface; and comparator means, in operative association with the coordinate processing means and with the movable machine, for comparing the true position of the movable machine member, as measured by the true position of the probe tip, with the desired position of the movable machine member.

  20. Intelligent System Controller for remote systems

    SciTech Connect

    Harrigan, R.W.

    1992-01-01

    The US Department of Energy's Office of Technology Development (OTD) has sponsored the development of the Generic Intelligent System Controller (GISC) for application to the clean up of hazardous waste sites. Of primary interest to the OTD is the development of technologies which result in faster, safer, and cheaper cleanup of hazardous waste sites than possible using conventional approaches. An objective of the GISC development project is to achieve these goals by developing a modular robotics control approach which reduces the time and cost of development by allowing reuse of control system software and uses computer models to improve the safety of remote site cleanup while reducing the time and life cycle costs.