Sample records for acquisition management system

  1. Acquisition Management for System of Systems: Affordability through Effective Portfolio Management

    DTIC Science & Technology

    2013-04-01

    the management of strategic “ portfolios of systems” in military acquisitions; this includes application of Real Options (RO) theory and metrics such...Affordability Through Effective Portfolio Management Navindran Davendralingam and Daniel DeLaurentis Purdue University Published April 1, 2013...Systems: Affordability Through Effective Portfolio Management 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d

  2. AZ-101 Mixer Pump Demonstration Data Acquisition System and Gamma Cart Data Acquisition Control System Software Configuration Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WHITE, D.A.

    1999-12-29

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the AZ1101 Mixer Pump Demonstration Data Acquisition System (DAS) and the Sludge Mobilization Cart (Gamma Cart) Data Acquisition and Control System (DACS).

  3. Information management system breadboard data acquisition and control system.

    NASA Technical Reports Server (NTRS)

    Mallary, W. E.

    1972-01-01

    Description of a breadboard configuration of an advanced information management system based on requirements for high data rates and local and centralized computation for subsystems and experiments to be housed on a space station. The system is to contain a 10-megabit-per-second digital data bus, remote terminals with preprocessor capabilities, and a central multiprocessor. A concept definition is presented for the data acquisition and control system breadboard, and a detailed account is given of the operation of the bus control unit, the bus itself, and the remote acquisition and control unit. The data bus control unit is capable of operating under control of both its own test panel and the test processor. In either mode it is capable of both single- and multiple-message operation in that it can accept a block of data requests or update commands for transmission to the remote acquisition and control unit, which in turn is capable of three levels of data-handling complexity.

  4. System safety management lessons learned from the US Army acquisition process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Piatt, J.A.

    1989-05-01

    The Assistant Secretary of the Army for Research, Development and Acquisition directed the Army Safety Center to provide an audit of the causes of accidents and safety of use restrictions on recently fielded systems by tracking residual hazards back through the acquisition process. The objective was to develop lessons learned'' that could be applied to the acquisition process to minimize mishaps in fielded systems. System safety management lessons learned are defined as Army practices or policies, derived from past successes and failures, that are expected to be effective in eliminating or reducing specific systemic causes of residual hazards. They aremore » broadly applicable and supportive of the Army structure and acquisition objectives. Pacific Northwest Laboratory (PNL) was given the task of conducting an independent, objective appraisal of the Army's system safety program in the context of the Army materiel acquisition process by focusing on four fielded systems which are products of that process. These systems included the Apache helicopter, the Bradley Fighting Vehicle (BFV), the Tube Launched, Optically Tracked, Wire Guided (TOW) Missile and the High Mobility Multipurpose Wheeled Vehicle (HMMWV). The objective of this study was to develop system safety management lessons learned associated with the acquisition process. The first step was to identify residual hazards associated with the selected systems. Since it was impossible to track all residual hazards through the acquisition process, certain well-known, high visibility hazards were selected for detailed tracking. These residual hazards illustrate a variety of systemic problems. Systemic or process causes were identified for each residual hazard and analyzed to determine why they exist. System safety management lessons learned were developed to address related systemic causal factors. 29 refs., 5 figs.« less

  5. [Wound information management system: a standardized scheme for acquisition, storage and management of wound information].

    PubMed

    Liu, Hu; Su, Rong-jia; Wu, Min-jie; Zhang, Yi; Qiu, Xiang-jun; Feng, Jian-gang; Xie, Ting; Lu, Shu-liang

    2012-06-01

    To form a wound information management scheme with objectivity, standardization, and convenience by means of wound information management system. A wound information management system was set up with the acquisition terminal, the defined wound description, the data bank, and related softwares. The efficacy of this system was evaluated in clinical practice. The acquisition terminal was composed of the third generation mobile phone and the software. It was feasible to get access to the wound information, including description, image, and therapeutic plan from the data bank by mobile phone. During 4 months, a collection of a total of 232 wound treatment information was entered, and accordingly standardized data of 38 patients were formed automatically. This system can provide standardized wound information management by standardized techniques of acquisition, transmission, and storage of wound information. It can be used widely in hospitals, especially primary medical institutions. Data resource of the system makes it possible for epidemiological study with large sample size in future.

  6. Introduction to Defense Acquisition Management

    DTIC Science & Technology

    1989-03-01

    the system after Most new systems follow the same formatted and its usefullness in the weapon inventory predictable life cycle, and fit the model...natives for system concept development Statement (MNS) setting forth requirements need- -An acquisition strategy is developed to guide ed to meet the...6 BUSINESS, FINANCIAL AND TECHNICAL ASPECTS OF SYSTEMS ACQUISITION Management of the systems acquisition process The acquisition planning phase of the

  7. The Resource Manager the ATLAS Trigger and Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Aleksandrov, I.; Avolio, G.; Lehmann Miotto, G.; Soloviev, I.

    2017-10-01

    The Resource Manager is one of the core components of the Data Acquisition system of the ATLAS experiment at the LHC. The Resource Manager marshals the right for applications to access resources which may exist in multiple but limited copies, in order to avoid conflicts due to program faults or operator errors. The access to resources is managed in a manner similar to what a lock manager would do in other software systems. All the available resources and their association to software processes are described in the Data Acquisition configuration database. The Resource Manager is queried about the availability of resources every time an application needs to be started. The Resource Manager’s design is based on a client-server model, hence it consists of two components: the Resource Manager “server” application and the “client” shared library. The Resource Manager server implements all the needed functionalities, while the Resource Manager client library provides remote access to the “server” (i.e., to allocate and free resources, to query about the status of resources). During the LHC’s Long Shutdown period, the Resource Manager’s requirements have been reviewed at the light of the experience gained during the LHC’s Run 1. As a consequence, the Resource Manager has undergone a full re-design and re-implementation cycle with the result of a reduction of the code base by 40% with respect to the previous implementation. This contribution will focus on the way the design and the implementation of the Resource Manager could leverage the new features available in the C++11 standard, and how the introduction of external libraries (like Boost multi-container) led to a more maintainable system. Additionally, particular attention will be given to the technical solutions adopted to ensure the Resource Manager could effort the typical requests rates of the Data Acquisition system, which is about 30000 requests in a time window of few seconds coming from more

  8. Web-based data acquisition and management system for GOSAT validation Lidar data analysis

    NASA Astrophysics Data System (ADS)

    Okumura, Hiroshi; Takubo, Shoichiro; Kawasaki, Takeru; Abdullah, Indra N.; Uchino, Osamu; Morino, Isamu; Yokota, Tatsuya; Nagai, Tomohiro; Sakai, Tetsu; Maki, Takashi; Arai, Kohei

    2012-11-01

    An web-base data acquisition and management system for GOSAT (Greenhouse gases Observation SATellite) validation lidar data analysis is developed. The system consists of data acquisition sub-system (DAS) and data management sub-system (DMS). DAS written in Perl language acquires AMeDAS ground-level meteorological data, Rawinsonde upper-air meteorological data, ground-level oxidant data, skyradiometer data, skyview camera images, meteorological satellite IR image data and GOSAT validation lidar data. DMS written in PHP language demonstrates satellite-pass date and all acquired data.

  9. Acquisition management of the Global Transportation Network

    DOT National Transportation Integrated Search

    2001-08-02

    This report discusses the acquisition management of the Global transportation Network by the U.S. Transportation Command. This report is one in a series of audit reports addressing DoD acquisition management of information technology systems. The Glo...

  10. Acquisition-Management Program

    NASA Technical Reports Server (NTRS)

    Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.

    1987-01-01

    NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.

  11. 48 CFR 2801.603-1 - Department of Justice Acquisition Career Management Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Representatives, or equivalent positions. (c) The program shall include: (1) Management information system... acquisition workforce management information system. (2) Individual assessments and development plans for... Acquisition Career Management Program. 2801.603-1 Section 2801.603-1 Federal Acquisition Regulations System...

  12. Acquisition Management for System of Systems: Requirement Evolution and Acquisition Strategy Planning

    DTIC Science & Technology

    2013-01-29

    of modern portfolio and control theory . The reformulation allows for possible changes in estimated quantities (e.g., due to market shifts in... Portfolio Theory (MPT). Final Report: NPS award N00244-11-1-0003 5 Extending CEM and Markov: Agent-Based Modeling Approach Research conducted in the...integration and acquisition from a robust portfolio theory standpoint. Robust portfolio management methodologies have been widely used by financial

  13. Improvement of web-based data acquisition and management system for GOSAT validation lidar data analysis

    NASA Astrophysics Data System (ADS)

    Okumura, Hiroshi; Takubo, Shoichiro; Kawasaki, Takeru; Abdullah, Indra Nugraha; Uchino, Osamu; Morino, Isamu; Yokota, Tatsuya; Nagai, Tomohiro; Sakai, Tetsu; Maki, Takashi; Arai, Kohei

    2013-01-01

    A web-base data acquisition and management system for GOSAT (Greenhouse gases Observation SATellite) validation lidar data-analysis has been developed. The system consists of data acquisition sub-system (DAS) and data management sub-system (DMS). DAS written in Perl language acquires AMeDAS (Automated Meteorological Data Acquisition System) ground-level local meteorological data, GPS Radiosonde upper-air meteorological data, ground-level oxidant data, skyradiometer data, skyview camera images, meteorological satellite IR image data and GOSAT validation lidar data. DMS written in PHP language demonstrates satellite-pass date and all acquired data. In this article, we briefly describe some improvement for higher performance and higher data usability. GPS Radiosonde upper-air meteorological data and U.S. standard atmospheric model in DAS automatically calculate molecule number density profiles. Predicted ozone density prole images above Saga city are also calculated by using Meteorological Research Institute (MRI) chemistry-climate model version 2 for comparison to actual ozone DIAL data.

  14. Advanced Data Acquisition Systems

    NASA Technical Reports Server (NTRS)

    Perotti, J.

    2003-01-01

    Current and future requirements of the aerospace sensors and transducers field make it necessary for the design and development of new data acquisition devices and instrumentation systems. New designs are sought to incorporate self-health, self-calibrating, self-repair capabilities, allowing greater measurement reliability and extended calibration cycles. With the addition of power management schemes, state-of-the-art data acquisition systems allow data to be processed and presented to the users with increased efficiency and accuracy. The design architecture presented in this paper displays an innovative approach to data acquisition systems. The design incorporates: electronic health self-check, device/system self-calibration, electronics and function self-repair, failure detection and prediction, and power management (reduced power consumption). These requirements are driven by the aerospace industry need to reduce operations and maintenance costs, to accelerate processing time and to provide reliable hardware with minimum costs. The project's design architecture incorporates some commercially available components identified during the market research investigation like: Field Programmable Gate Arrays (FPGA) Programmable Analog Integrated Circuits (PAC IC) and Field Programmable Analog Arrays (FPAA); Digital Signal Processing (DSP) electronic/system control and investigation of specific characteristics found in technologies like: Electronic Component Mean Time Between Failure (MTBF); and Radiation Hardened Component Availability. There are three main sections discussed in the design architecture presented in this document. They are the following: (a) Analog Signal Module Section, (b) Digital Signal/Control Module Section and (c) Power Management Module Section. These sections are discussed in detail in the following pages. This approach to data acquisition systems has resulted in the assignment of patent rights to Kennedy Space Center under U.S. patent # 6

  15. Issues With Access to Acquisition Data and Information in the Department of Defense: Doing Data Right in Weapon System Acquisition

    DTIC Science & Technology

    2016-04-30

    Defense: Doing Data Right in Weapon System Acquisition Nancy Moore, Senior Management Scientist, RAND Megan McKernan, Defense Research Analyst...Access to Acquisition Data & Information in the Department of Defense: Doing Data Right in Weapon System Acquisition Nancy Moore, Senior Management...With Access to Acquisition Data and Information in the Department of Defense: Doing Data Right in Weapon System Acquisition Nancy Y. Moore—is a

  16. Crawler Acquisition and Testing Demonstration Project Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEFIGH-PRICE, C.

    2000-10-23

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  17. Manage Toward Success - Utilization of Analytics in Acquisition Decision Making

    DTIC Science & Technology

    2015-04-01

    on the concept of knowledge- based acquisition described by the GAO. In the GAO (2005) report for National Aeronautics and Space Administration ( NASA ...acquisition programs, GAO recommended to NASA , and NASA subsequently con- curred, that transition to a knowledge-based acquisition framework will...Certification and Accreditation Process; ERAM = Enterprise Risk Assessment Manager; EVMS = Earned Value Management System; GOV = Government; POA&M = Plan of

  18. Manager’s Guide to Technology Transition in an Evolutionary Acquisition Environment

    DTIC Science & Technology

    2005-06-01

    program managers, product managers, staffs, and organizations that manage the development , procurement, production, and fielding of systems...rapidly advancing technologies. Technology transitions can occur during the development of systems, or even after a system has been in the field ...Documentation Evolutionary acquisition is an acquisition strategy that defines, develops , produces or acquires, and fields an initial hardware or software

  19. Identifying Governance Best Practices in Systems-of-Systems Acquisition

    DTIC Science & Technology

    2014-02-08

    Acquisition Governance ................................................ 28  Figure 3.  Harvest Hercules Airborne Weapons Kit System Components ...... 39 ...acquisition poses considerable challenges that the current Department of Defense (DoD) acquisition governance structure was not necessarily designed to...specify the warship it needed along with the design , construction, and outfitting of the ship. The Navy managed and performed production operations and

  20. Software Acquisition: Evolution, Total Quality Management, and Applications to the Army Tactical Missile System

    DTIC Science & Technology

    1992-06-01

    presents the concept of software Total Quality Management (TQM) which focuses on the entire process of software acquisition, as a partial solution to...software TQM can be applied to software acquisition. Software Development, Software Acquisition, Total Quality management (TQM), Army Tactical Missile

  1. Complex System Governance for Acquisition

    DTIC Science & Technology

    2016-04-30

    2014, September–October). Cybersecurity challenges for program managers . Defense AT&L. Naphade, M., Banavar, G., Harrison, C., Paraszczak, J...the Acquisition Research Program of the Graduate School of Business & Public Policy at the Naval Postgraduate School. To request defense...Dickmann, Vice President, Sonalysts Inc. A Complex Systems Perspective of Risk Mitigation and Modeling in Development and Acquisition Programs Roshanak

  2. Concepts. The Journal of Defense Systems Acquisition Management. Winter 1981. Volume 4. Number 1.

    DTIC Science & Technology

    1981-01-01

    Long, USAF A major challenge facing the program manager is to effectively obtain and manage program funds. It is the author’s view that too few...Henry H. Mendenhall As defense systems become more and more complex, an effective test and evaluation program becomes more and more necessary. This means...that lies ahead for the military acquisition manager. And let us not think for a moment that optimism alone will suffice. Good, effective , efficient

  3. Diagnostic-management system and test pulse acquisition for WEST plasma measurement system

    NASA Astrophysics Data System (ADS)

    Wojenski, A.; Kasprowicz, G.; Pozniak, K. T.; Byszuk, A.; Juszczyk, B.; Zabolotny, W.; Zienkiewicz, P.; Chernyshova, M.; Czarski, T.; Mazon, D.; Malard, P.

    2014-11-01

    This paper describes current status of electronics, firmware and software development for new plasma measurement system for use in WEST facility. The system allows to perform two dimensional plasma visualization (in time) with spectrum measurement. The analog front-end is connected to Gas Electron Multiplier detector (GEM detector). The system architecture have high data throughput due to use of PCI-Express interface, Gigabit Transceivers and sampling frequency of ADC integrated circuits. The hardware is based on several years of experience in building X-ray spectrometer system for Joint European Torus (JET) facility. Data streaming is done using Artix7 FPGA devices. The system in basic configuration can work with up to 256 channels, while the maximum number of measurement channels is 2048. Advanced firmware for the FPGA is required in order to perform high speed data streaming and analog signal sampling. Diagnostic system management has been developed in order to configure measurement system, perform necessary calibration and prepare hardware for data acquisition.

  4. Hospital acquisition or management contract: a theory of strategic choice.

    PubMed

    Morrisey, M A; Alexander, J A

    1987-01-01

    Differences in the mission of the hospital and the multihospital system are key elements underlying the development of a management contract. Preliminary analysis suggests that the number of potential new acquisitions is severely limited, that contract management is not a stepping stone to acquisition, and that many recent management contracts appear to be attempts to overcome problems beyond the hospital's and the contractor's direct control.

  5. System and method for acquisition management of subject position information

    DOEpatents

    Carrender, Curt

    2005-12-13

    A system and method for acquisition management of subject position information that utilizes radio frequency identification (RF ID) to store position information in position tags. Tag programmers receive position information from external positioning systems, such as the Global Positioning System (GPS), from manual inputs, such as keypads, or other tag programmers. The tag programmers program each position tag with the received position information. Both the tag programmers and the position tags can be portable or fixed. Implementations include portable tag programmers and fixed position tags for subject position guidance, and portable tag programmers for collection sample labeling. Other implementations include fixed tag programmers and portable position tags for subject route recordation. Position tags can contain other associated information such as destination address of an affixed subject for subject routing.

  6. System and method for acquisition management of subject position information

    DOEpatents

    Carrender, Curt [Morgan Hill, CA

    2007-01-23

    A system and method for acquisition management of subject position information that utilizes radio frequency identification (RF ID) to store position information in position tags. Tag programmers receive position information from external positioning systems, such as the Global Positioning System (GPS), from manual inputs, such as keypads, or other tag programmers. The tag programmers program each position tag with the received position information. Both the tag programmers and the position tags can be portable or fixed. Implementations include portable tag programmers and fixed position tags for subject position guidance, and portable tag programmers for collection sample labeling. Other implementations include fixed tag programmers and portable position tags for subject route recordation. Position tags can contain other associated information such as destination address of an affixed subject for subject routing.

  7. The Acquisition Process as a Vehicle for Enabling Knowledge Management in the Lifecycle of Complex Federal Systems

    NASA Technical Reports Server (NTRS)

    Stewart, Helen; Spence, Matt Chew; Holm, Jeanne; Koga, Dennis (Technical Monitor)

    2001-01-01

    This white paper explores how to increase the success and operation of critical, complex, national systems by effectively capturing knowledge management requirements within the federal acquisition process. Although we focus on aerospace flight systems, the principles outlined within may have a general applicability to other critical federal systems as well. Fundamental design deficiencies in federal, mission-critical systems have contributed to recent, highly visible system failures, such as the V-22 Osprey and the Delta rocket family. These failures indicate that the current mechanisms for knowledge management and risk management are inadequate to meet the challenges imposed by the rising complexity of critical systems. Failures of aerospace system operations and vehicles may have been prevented or lessened through utilization of better knowledge management and information management techniques.

  8. Interoperable Acquisition for Systems of Systems: The Challenges

    DTIC Science & Technology

    2006-09-01

    Interoperable Acquisition for Systems of Systems: The Challenges James D. Smith II D. Mike Phillips September 2006 TECHNICAL NOTE...Failure of Program-Centric Risk Management 10 3.3.2 Absence of System-of-Systems Engineering 12 3.3.3 Disconnect Between System-of-Systems...SOFTWARE ENGINEERING INSTITUTE | vii viii | CMU/SEI-2006-TN-034 Abstract Large, complex systems development has always been challenging , even when the

  9. Requirements management: keeping your technology acquisition project under control.

    PubMed

    Carr, J J

    2000-03-01

    Whether you are acquiring clinical or business information systems, patient monitoring systems, or therapeutic and diagnostic systems, the odds are good that the project will be delivered late, will cost far more than predicted, and will not provide all the features promised. The principal reason for project failure is improper management of the requirements of the system. Requirements engineering and management is a skill from the systems engineering profession that can be learned by nearly any professional who is managing a technology acquisition project. The author discusses what requirements engineering and management is and how it is done.

  10. 48 CFR 1401.370 - Acquisition Managers' Partnership.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Acquisition Managers' Partnership. (a) The Acquisition Managers' Partnership (AMP) is a forum for DOI's senior... and effectiveness of its procurement services in support of DOI's mission. (b) The AMP consists of the...

  11. Data Management Standards in Computer-aided Acquisition and Logistic Support (CALS)

    NASA Technical Reports Server (NTRS)

    Jefferson, David K.

    1990-01-01

    Viewgraphs and discussion on data management standards in computer-aided acquisition and logistic support (CALS) are presented. CALS is intended to reduce cost, increase quality, and improve timeliness of weapon system acquisition and support by greatly improving the flow of technical information. The phase 2 standards, industrial environment, are discussed. The information resource dictionary system (IRDS) is described.

  12. Acquisition Management for System-of-Systems: Requirement Evolution and Acquisition Strategy Planning

    DTIC Science & Technology

    2012-04-30

    DoD SERC Aeronautics & Astronautics 5/16/2012 NPS 9th Annual Acquisition Research Symposium...0.6 0.7 0.8 0.9 1 0 60 120 180 240 300 360 420 480 540 600 Pr ob ab ili ty to c om pl et e a m is si on Time (mins) architecture 1 architecture 2...1 6 11 /1 6 12 /1 6 13 /1 6 14 /1 6 15 /1 6 1Pr ob ab ili ty to c om pl et e a m is si on % of system failures worst-case in arch1 worst-case in

  13. Developing Program Management Leadership for Acquisition Reform

    DTIC Science & Technology

    2011-04-30

    mêçÅÉÉÇáåÖë= çÑ=íÜÉ= bfdeqe=^kkr^i=^`nrfpfqflk== obpb^o`e=pvjmlpfrj== qeropa^v=pbppflkp== slirjb ff Developing Program Management Leadership for...4. TITLE AND SUBTITLE Developing Program Management Leadership for Acquisition Reform 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...Developing Program  Management   Leadership   for Acquisition Reform    The 8th Annual Acquisition Research Symposium Panel #20: Investing in People

  14. Will Empowerment of USAF Program Managers Mitigate the Acquisitions Crisis

    DTIC Science & Technology

    2016-06-10

    FAR Federal Acquisition Regulations GAO Government Accountability Office MDAP Major Defense Acquisition Program USAF United States Air Force ix...actually run the project. The Government Accountability Office (GAO),2 along with many other organizations, including Congress in their 2016 National...1 Government Accountability Office (GAO), GAO-06-110, Best Practices: Better Support of Weapons Systems Program Managers Needed to

  15. DoD Weapon System Acquisition Reform Product Support Assessment

    DTIC Science & Technology

    2009-11-01

    can be best effected by working through the Defense Acquisition University, the Logistics Functional IPT, the Acquisition Management Functional... WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of Defense,Undersecretary of Defense for Acquisition,Technology and...each year in product support. Reformed stewardship—driven by improving product support and achieving more cost- effective weapon system readiness

  16. Major system acquisitions process (A-109)

    NASA Technical Reports Server (NTRS)

    Saric, C.

    1991-01-01

    The Major System examined is a combination of elements (hardware, software, facilities, and services) that function together to produce capabilities required to fulfill a mission need. The system acquisition process is a sequence of activities beginning with documentation of mission need and ending with introduction of major system into operational use or otherwise successful achievement of program objectives. It is concluded that the A-109 process makes sense and provides a systematic, integrated management approach along with appropriate management level involvement and innovative and 'best ideas' from private sector in satisfying mission needs.

  17. 48 CFR 245.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management system compliance. 245.105 Section 245.105 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractors' property management system compliance. (a) Definitions— (1) Acceptable property management system...

  18. 76 FR 71465 - Defense Federal Acquisition Regulation Supplement: Management of Manufacturing Risk in Major...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... Government procurement. Mary Overstreet, Editor, Defense Acquisition Regulations System. Interim Rule Adopted... Federal Acquisition Regulation Supplement: Management of Manufacturing Risk in Major Defense Acquisition...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the...

  19. 48 CFR 3046.790 - Use of warranties in major systems acquisitions by the USCG (USCG).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Use of warranties in major systems acquisitions by the USCG (USCG). 3046.790 Section 3046.790 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) CONTRACT MANAGEMENT QUALITY...

  20. Designing a Graphical Decision Support Tool to Improve System Acquisition Decisions

    DTIC Science & Technology

    2009-06-01

    relationships within the data [9]. Displaying acquisition data in a graphical manner was chosen because graphical formats, in general, have been...acquisition plan which includes information pertaining to the acquisition objectives, the required capability of the system, design trade-off, budgeting...which introduce artificial neural networks to approximate the real world experience of an acquisition manager [8]. However, these strategies lack a

  1. 48 CFR 245.105 - Contractor's property management system compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... management system compliance. 245.105 Section 245.105 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractor's property management system compliance. The assigned property administrator shall perform...

  2. 76 FR 71464 - Defense Federal Acquisition Regulation Supplement; Transition to the System for Award Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... Regulation Supplement for the transition of the Integrated Acquisition Environment systems to the new System... Acquisition Environment (IAE) is an electronic Government initiative that aggregates Federal acquisition...

  3. Data acquisition system

    DOEpatents

    Shapiro, Stephen L.; Mani, Sudhindra; Atlas, Eugene L.; Cords, Dieter H. W.; Holbrook, Britt

    1997-01-01

    A data acquisition circuit for a particle detection system that allows for time tagging of particles detected by the system. The particle detection system screens out background noise and discriminate between hits from scattered and unscattered particles. The detection system can also be adapted to detect a wide variety of particle types. The detection system utilizes a particle detection pixel array, each pixel containing a back-biased PIN diode, and a data acquisition pixel array. Each pixel in the particle detection pixel array is in electrical contact with a pixel in the data acquisition pixel array. In response to a particle hit, the affected PIN diodes generate a current, which is detected by the corresponding data acquisition pixels. This current is integrated to produce a voltage across a capacitor, the voltage being related to the amount of energy deposited in the pixel by the particle. The current is also used to trigger a read of the pixel hit by the particle.

  4. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  5. Expert Systems and Command, Control, and Communication System Acquisition

    DTIC Science & Technology

    1989-03-01

    Systems and Command, Control, and Communicaton System Acquisition 12 Personal Author(s) James E. Minnema 13a Type of Report 13b Time Covered 14 Date...isolated strategic planning, unstructured problems, the author feels that this category should also include problems involving the integration of...distinct operational or management control, and structured or semi-structured problem efforts. The reason for this is that integration of a number of

  6. META-GLARE: A meta-system for defining your own computer interpretable guideline system-Architecture and acquisition.

    PubMed

    Bottrighi, Alessio; Terenziani, Paolo

    2016-09-01

    Several different computer-assisted management systems of computer interpretable guidelines (CIGs) have been developed by the Artificial Intelligence in Medicine community. Each CIG system is characterized by a specific formalism to represent CIGs, and usually provides a manager to acquire, consult and execute them. Though there are several commonalities between most formalisms in the literature, each formalism has its own peculiarities. The goal of our work is to provide a flexible support to the extension or definition of CIGs formalisms, and of their acquisition and execution engines. Instead of defining "yet another CIG formalism and its manager", we propose META-GLARE (META Guideline Acquisition, Representation, and Execution), a "meta"-system to define new CIG systems. In this paper, META-GLARE, a meta-system to define new CIG systems, is presented. We try to capture the commonalities among current CIG approaches, by providing (i) a general manager for the acquisition, consultation and execution of hierarchical graphs (representing the control flow of actions in CIGs), parameterized over the types of nodes and of arcs constituting it, and (ii) a library of different elementary components of guidelines nodes (actions) and arcs, in which each type definition involves the specification of how objects of this type can be acquired, consulted and executed. We provide generality and flexibility, by allowing free aggregations of such elementary components to define new primitive node and arc types. We have drawn several experiments, in which we have used META-GLARE to build a CIG system (Experiment 1 in Section 8), or to extend it (Experiments 2 and 3). Such experiments show that META-GLARE provides a useful and easy-to-use support to such tasks. For instance, re-building the Guideline Acquisition, Representation, and Execution (GLARE) system using META-GLARE required less than one day (Experiment 1). META-GLARE is a meta-system for CIGs supporting fast prototyping

  7. 48 CFR 1401.370 - Acquisition Managers' Partnership.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... acquisition management community to work cooperatively and continuously to improve the management, efficiency... Associate Chairperson are leadership roles that will rotate annually. The AMP Chairperson determines when...

  8. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractors' property management system compliance. 45.105 Section 45.105 Federal Acquisition Regulations System FEDERAL... the contractor's property management policies, procedures, practices, and systems. This analysis shall...

  9. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contractors' property management system compliance. 45.105 Section 45.105 Federal Acquisition Regulations System FEDERAL... the contractor's property management policies, procedures, practices, and systems. This analysis shall...

  10. Improving the Acquisition and Management of Sample Curation Data

    NASA Technical Reports Server (NTRS)

    Todd, Nancy S.; Evans, Cindy A.; Labasse, Dan

    2011-01-01

    This paper discusses the current sample documentation processes used during and after a mission, examines the challenges and special considerations needed for designing effective sample curation data systems, and looks at the results of a simulated sample result mission and the lessons learned from this simulation. In addition, it introduces a new data architecture for an integrated sample Curation data system being implemented at the NASA Astromaterials Acquisition and Curation department and discusses how it improves on existing data management systems.

  11. 48 CFR Appendix - Federal Acquisition Regulation (FAR) Index

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Federal Acquisition Regulation (FAR) Index Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System...

  12. 48 CFR 246.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 246.404 Section 246.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE...

  13. 48 CFR 246.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 246.404 Section 246.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE...

  14. 48 CFR 246.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 246.404 Section 246.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE...

  15. 48 CFR 246.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 246.404 Section 246.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE...

  16. 48 CFR 246.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 246.404 Section 246.404 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE...

  17. An integrated information system for the acquisition, management and sharing of environmental data aimed to decision making

    NASA Astrophysics Data System (ADS)

    La Loggia, Goffredo; Arnone, Elisa; Ciraolo, Giuseppe; Maltese, Antonino; Noto, Leonardo; Pernice, Umberto

    2012-09-01

    This paper reports the first results of the Project SESAMO - SistEma informativo integrato per l'acquisizione, geStione e condivisione di dati AMbientali per il supportO alle decisioni (Integrated Information System for the acquisition, management and sharing of environmental data aimed to decision making). The main aim of the project is to design and develop an integrated environmental information platform able to provide monitoring services for decision support, integrating data from different environmental monitoring systems (including WSN). This ICT platform, based on a service-oriented architecture (SOA), will be developed to coordinate a wide variety of data acquisition systems, based on heterogeneous technologies and communication protocols, providing different sort of environmental monitoring services. The implementation and validation of the SESAMO platform and its services will involve three specific environmental domains: 1) Urban water losses; 2) Early warning system for rainfall-induced landslides; 3) Precision irrigation planning. Services in the first domain are enabled by a low cost sensors network collecting and transmitting data, in order to allow the pipeline network managers to analyze pressure, velocity and discharge data for reducing water losses in an urban contest. This paper outlines the SESAMO functional and technological structure and then gives a concise description of the service design and development process for the second and third domain. Services in the second domain are enabled by a prototypal early warning system able to identify in near-real time high-risk zones of rainfall-induced landslides. Services in the third domain are aimed to optimize irrigation planning of vineyards depending on plant water stress.

  18. 48 CFR Appendix - Federal Acquisition Regulation (FAR) Index

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Federal Acquisition Regulation (FAR) Index Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS) Contract clause. FAR Index Federal...

  19. 48 CFR Appendix - Federal Acquisition Regulation (FAR) Index

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Federal Acquisition Regulation (FAR) Index Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS) Contract clause. FAR Index Federal...

  20. The Impact of Environmental Regulation on Defense System Acquisition Management

    DTIC Science & Technology

    1976-05-01

    producer, had been the sole source for the fuel. The process of manufacturing the fuel also produced a toxic ~arcinogenic byproduct. This condition caused...minimized. Could the design be quieter? Does the maintenance of the system require environmentally sensitive equipment, processes , or material? For ... Of particular interest to this report is the effect of such regulation on the defense system acquisition process . There is a direct impact on the

  1. Acquisition Logistics Guidelines for Improving the Argentine Air Force Weapon System Acquisition Process

    DTIC Science & Technology

    1999-03-01

    these kinds of sources: Industry standards Other commercial or military customers LMI specification summaries Contractor’s in-house data Section...government and industry managers to achieve program objectives. • Putting in place for fielded systems additional incentives to reduce operating and...meaning clarifications; an explanation of the roles of Congress, the Executive Branch, and Industry in defense acquisition; and an overview on the

  2. A knowledge acquisition process to analyse operational problems in solid waste management facilities.

    PubMed

    Dokas, Ioannis M; Panagiotakopoulos, Demetrios C

    2006-08-01

    The available expertise on managing and operating solid waste management (SWM) facilities varies among countries and among types of facilities. Few experts are willing to record their experience, while few researchers systematically investigate the chains of events that could trigger operational failures in a facility; expertise acquisition and dissemination, in SWM, is neither popular nor easy, despite the great need for it. This paper presents a knowledge acquisition process aimed at capturing, codifying and expanding reliable expertise and propagating it to non-experts. The knowledge engineer (KE), the person performing the acquisition, must identify the events (or causes) that could trigger a failure, determine whether a specific event could trigger more than one failure, and establish how various events are related among themselves and how they are linked to specific operational problems. The proposed process, which utilizes logic diagrams (fault trees) widely used in system safety and reliability analyses, was used for the analysis of 24 common landfill operational problems. The acquired knowledge led to the development of a web-based expert system (Landfill Operation Management Advisor, http://loma.civil.duth.gr), which estimates the occurrence possibility of operational problems, provides advice and suggests solutions.

  3. Automated Acquisition Systems: Keynote Address.

    ERIC Educational Resources Information Center

    Boss, Richard D.

    1980-01-01

    The 1980s offer libraries numerous automated acquisitions alternatives, including turnkey systems from circulation system vendors and the acquisition subsystems of the bibliographic utilities. Integration of systems from several sources poses the principal problem. (Author/RAA)

  4. A comprehensive data acquisition and management system for an ecosystem-scale peatland warming and elevated CO2 experiment

    NASA Astrophysics Data System (ADS)

    Krassovski, M. B.; Riggs, J. S.; Hook, L. A.; Nettles, W. R.; Hanson, P. J.; Boden, T. A.

    2015-07-01

    Ecosystem-scale manipulation experiments represent large science investments that require well-designed data acquisition and management systems to provide reliable, accurate information to project participants and third party users. The SPRUCE Project (Spruce and Peatland Responses Under Climatic and Environmental Change, http://mnspruce.ornl.gov) is such an experiment funded by the Department of Energy's (DOE), Office of Science, Terrestrial Ecosystem Science (TES) Program. The SPRUCE experimental mission is to assess ecosystem-level biological responses of vulnerable, high carbon terrestrial ecosystems to a range of climate warming manipulations and an elevated CO2 atmosphere. SPRUCE provides a platform for testing mechanisms controlling the vulnerability of organisms, biogeochemical processes, and ecosystems to climatic change (e.g., thresholds for organism decline or mortality, limitations to regeneration, biogeochemical limitations to productivity, the cycling and release of CO2 and CH4 to the atmosphere). The SPRUCE experiment will generate a wide range of continuous and discrete measurements. To successfully manage SPRUCE data collection, achieve SPRUCE science objectives, and support broader climate change research, the research staff has designed a flexible data system using proven network technologies and software components. The primary SPRUCE data system components are: 1. Data acquisition and control system - set of hardware and software to retrieve biological and engineering data from sensors, collect sensor status information, and distribute feedback to control components. 2. Data collection system - set of hardware and software to deliver data to a central depository for storage and further processing. 3. Data management plan - set of plans, policies, and practices to control consistency, protect data integrity, and deliver data. This publication presents our approach to meeting the

  5. A comprehensive data acquisition and management system for an ecosystem-scale peatland warming and elevated CO2 experiment

    NASA Astrophysics Data System (ADS)

    Krassovski, M. B.; Riggs, J. S.; Hook, L. A.; Nettles, W. R.; Hanson, P. J.; Boden, T. A.

    2015-11-01

    Ecosystem-scale manipulation experiments represent large science investments that require well-designed data acquisition and management systems to provide reliable, accurate information to project participants and third party users. The SPRUCE project (Spruce and Peatland Responses Under Climatic and Environmental Change, http://mnspruce.ornl.gov) is such an experiment funded by the Department of Energy's (DOE), Office of Science, Terrestrial Ecosystem Science (TES) Program. The SPRUCE experimental mission is to assess ecosystem-level biological responses of vulnerable, high carbon terrestrial ecosystems to a range of climate warming manipulations and an elevated CO2 atmosphere. SPRUCE provides a platform for testing mechanisms controlling the vulnerability of organisms, biogeochemical processes, and ecosystems to climatic change (e.g., thresholds for organism decline or mortality, limitations to regeneration, biogeochemical limitations to productivity, and the cycling and release of CO2 and CH4 to the atmosphere). The SPRUCE experiment will generate a wide range of continuous and discrete measurements. To successfully manage SPRUCE data collection, achieve SPRUCE science objectives, and support broader climate change research, the research staff has designed a flexible data system using proven network technologies and software components. The primary SPRUCE data system components are the following: 1. data acquisition and control system - set of hardware and software to retrieve biological and engineering data from sensors, collect sensor status information, and distribute feedback to control components; 2. data collection system - set of hardware and software to deliver data to a central depository for storage and further processing; 3. data management plan - set of plans, policies, and practices to control consistency, protect data integrity, and deliver data. This publication presents our approach to meeting

  6. A comprehensive data acquisition and management system for an ecosystem-scale peatland warming and elevated CO 2 experiment

    DOE PAGES

    Krassovski, M. B.; Riggs, J. S.; Hook, L. A.; ...

    2015-11-09

    Ecosystem-scale manipulation experiments represent large science investments that require well-designed data acquisition and management systems to provide reliable, accurate information to project participants and third party users. The SPRUCE project (Spruce and Peatland Responses Under Climatic and Environmental Change, http://mnspruce.ornl.gov) is such an experiment funded by the Department of Energy's (DOE), Office of Science, Terrestrial Ecosystem Science (TES) Program. The SPRUCE experimental mission is to assess ecosystem-level biological responses of vulnerable, high carbon terrestrial ecosystems to a range of climate warming manipulations and an elevated CO 2 atmosphere. SPRUCE provides a platform for testing mechanisms controlling the vulnerability of organisms,more » biogeochemical processes, and ecosystems to climatic change (e.g., thresholds for organism decline or mortality, limitations to regeneration, biogeochemical limitations to productivity, and the cycling and release of CO 2 and CH 4 to the atmosphere). The SPRUCE experiment will generate a wide range of continuous and discrete measurements. In order to successfully manage SPRUCE data collection, achieve SPRUCE science objectives, and support broader climate change research, the research staff has designed a flexible data system using proven network technologies and software components. The primary SPRUCE data system components are the following; 1. data acquisition and control system – set of hardware and software to retrieve biological and engineering data from sensors, collect sensor status information, and distribute feedback to control components; 2. data collection system – set of hardware and software to deliver data to a central depository for storage and further processing; and 3. data management plan – set of plans, policies, and practices to control consistency, protect data integrity, and deliver data. This publication presents our approach to meeting the challenges of

  7. 48 CFR 46.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 46.404 Section 46.404 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance...

  8. 48 CFR 46.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 46.404 Section 46.404 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance...

  9. 48 CFR 46.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 46.404 Section 46.404 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance...

  10. 48 CFR 46.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 46.404 Section 46.404 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance...

  11. 48 CFR 46.404 - Government contract quality assurance for acquisitions at or below the simplified acquisition...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Government contract quality assurance for acquisitions at or below the simplified acquisition threshold. 46.404 Section 46.404 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance...

  12. Mergers and acquisitions in professional organizations: a complex adaptive systems approach.

    PubMed

    Walls, M E; McDaniel, R R

    1999-09-01

    Nurse managers face unique challenges as they cope with mergers and acquisitions among health care organizations. These challenges can be better understood if it is recognized that health care institutions are professional organizations and that the transformations required are extremely difficult. These difficulties are caused, in part, by the institutionalized nature of professional organizations, and this nature is explicated. Professional organizations are stubborn. They are repositories of expertise and values that are societal in origin and difficult to change. When professional organizations are understood as complex adaptive systems, complexity theory offers insight that provide strategies for managing mergers and acquisitions that may not be apparent when more traditional conceptualizations of professional organizations are used. Specific managerial techniques consistent with both the institutionalized characteristics and the complex adaptive systems characteristics of professional organizations are offered to nurse managers.

  13. 48 CFR 34.004 - Acquisition strategy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Acquisition strategy. 34... CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION General 34.004 Acquisition strategy. The program manager, as specified in agency procedures, shall develop an acquisition strategy tailored to the particular...

  14. Centaur propellant acquisition system

    NASA Technical Reports Server (NTRS)

    Blatt, M. H.; Aydelott, J. C.

    1975-01-01

    The desirability of replacing the hydrogen peroxide settling system of the Centaur D-1S with a capillary acquisition system was evaluated. A comprehensive screening was performed to select the most promising capillary device fluid acquisition, thermal conditioning, and fabrication techniques. Refillable start baskets and bypass feed start tanks were selected for detailed design. Critical analysis areas were settling and refilling, start sequence development with an initially dry boost pump, and cooling the fluid delivered to the boost pump to provide the necessary net positive suction head (NPSH). Design drawings were prepared for start basket and start tank concepts for both the liquid oxygen and liquid hydrogen tanks. System comparisons indicated that the start baskets using wicking flow for thermal conditioning, and thermal subcooling for providing boost pump NPSH, are the most desirable systems for future Centaur acquisition system development.

  15. 48 CFR 2452.242-71 - Contract management system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract management system... 2452.242-71 Contract management system. As prescribed in 2442.1107, insert the following clause: Contract Management System (FEB 2006) (a) The contractor shall use contract management baseline planning...

  16. Supervisory Control and Data Acquisition System | Energy Systems

    Science.gov Websites

    Integration Facility | NREL Supervisory Control and Data Acquisition System Supervisory Control supervisory control and data acquisition (SCADA) system monitors and controls safety systems and gathers real Energy Systems Integration Facility control room. The Energy Systems Integration Facility's SCADA system

  17. Use of software engineering techniques in the design of the ALEPH data acquisition system

    NASA Astrophysics Data System (ADS)

    Charity, T.; McClatchey, R.; Harvey, J.

    1987-08-01

    The SASD methodology is being used to provide a rigorous design framework for various components of the ALEPH data acquisition system. The Entity-Relationship data model is used to describe the layout and configuration of the control and acquisition systems and detector components. State Transition Diagrams are used to specify control applications such as run control and resource management and Data Flow Diagrams assist in decomposing software tasks and defining interfaces between processes. These techniques encourage rigorous software design leading to enhanced functionality and reliability. Improved documentation and communication ensures continuity over the system life-cycle and simplifies project management.

  18. 48 CFR 970.5232-7 - Financial management system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Financial management... for Management and Operating Contracts 970.5232-7 Financial management system. As prescribed in 970.3270(b)(1), insert the following clause: Financial Management System (DEC 2000) The Contractor shall...

  19. 48 CFR 970.5232-7 - Financial management system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintain and administer a financial management system that is suitable to provide proper accounting in... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Financial management... for Management and Operating Contracts 970.5232-7 Financial management system. As prescribed in 970...

  20. Systems management techniques and problems

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Report is reviewed which discusses history and trends of systems management, its basic principles, and nature of problems that lend themselves to systems approach. Report discusses systems engineering as applied to weapons acquisition, ecology, patient monitoring, and retail merchandise operations.

  1. Job Attitudes of AFSC (Air Force Systems Command) Acquisition Project Managers.

    DTIC Science & Technology

    1986-04-01

    for performance (3rd ed.). Homewood, IL: Irwin. Ajzen , 1. & Fishbein , M . (1977). Attitude-behavior relations: A theoretical analysis and review of...factors that may be influencing job attitudes. I X. Chapter One I NTRODUCTION Today, about 2000 Air Force members manage the acquisit ion of bi1lions of...ison.i .ncl I (’ate" Nt ro’ p 2ject ranager s and cther AFSC o tI c rs ha N.e s ie m a r - a t t ,.des, IL t their att itudes ai e lower compai ed to

  2. 48 CFR 434.004 - Acquisition strategy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....004 Section 434.004 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL... manager will develop, in coordination with the Acquisition Executive or Major Information Technology... approval of the Acquisition Executive or Major Information Technology Systems Executive, a project control...

  3. Data Acquisition for Modular Biometric Monitoring System

    NASA Technical Reports Server (NTRS)

    Grodsinsky, Carlos M. (Inventor); Chmiel, Alan J. (Inventor); Humphreys, Bradley T. (Inventor)

    2014-01-01

    A modular system for acquiring biometric data includes a plurality of data acquisition modules configured to sample biometric data from at least one respective input channel at a data acquisition rate. A representation of the sampled biometric data is stored in memory of each of the plurality of data acquisition modules. A central control system is in communication with each of the plurality of data acquisition modules through a bus. The central control system is configured to collect data asynchronously, via the bus, from the memory of the plurality of data acquisition modules according to a relative fullness of the memory of the plurality of data acquisition modules.

  4. Space storable propellant acquisition system

    NASA Technical Reports Server (NTRS)

    Tegart, J. R.; Uney, P. E.; Anderson, J. E.; Fester, D. A.

    1972-01-01

    Surface tension propellant acquisition concepts for an advanced spacecraft propulsion system having a 10-year mission capability were investigated. Surface tension systems were specified because they were shown to be the best propellant acquisition technique for various interplanetery spacecraft in a prior study. A variety of surface tension concepts for accomplishing propellant acquisition were formulated for the baseline space storable propulsion module and Jupiter Orbiter mission. Analyses and evaluations were then conducted on each candidate concept to assess fabricability, performance capability, and spacecraft compatibility. A comparative evaluation of the results showed the Fruhof-class of low-g surface tension systems to be preferred for these interplanetary applications.

  5. Planning the Implementation of an Integrated On-line Acquisitions System.

    ERIC Educational Resources Information Center

    Baldwin, Paul E.

    1984-01-01

    Discusses need to consider political context of decision-making process and describes how cost data were presented to obtain management approval for implementation planning for integrated online acquisitions and fund accounting system involving Simon Fraser University, University of British Columbia, and University of Victoria. Cost, budget, and…

  6. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  7. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  8. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  9. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (MAY 2014) (a) The Contractor shall use an earned value management system (EVMS...

  10. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  11. Mobile real-time data acquisition system for application in preventive medicine.

    PubMed

    Neubert, Sebastian; Arndt, Dagmar; Thurow, Kerstin; Stoll, Regina

    2010-05-01

    In this article, the development of a system for online monitoring of a subject's physiological parameters and subjective workload regardless of location has been presented, which allows for studies on occupational health. In the sector of occupational health, modern acquisition systems are needed. Such systems can be used by the subject during usual daily routines without being influenced by the presence of an examiner. Moreover, the system's influence on the subject should be reduced to a minimum to receive reliable data from the examination. The acquisition system is based on a mobile handheld (or smart phone), which allows both management of the communication process and input of several dialog data (e.g., questionnaires). A sensor electronics module permits the acquisition of different physiological parameters and their online transmission to the handheld via Bluetooth. The mobile handheld and the sensor electronics module constitute a wireless personal area network. The handheld allows the first analysis, the synchronization of the data, and the continuous data transfer to a communication server by the integrated mobile radio standards of the handheld. The communication server stores the incoming data of several subjects in an application-dependent database and allows access from all over the world via a Web-based management system. The developed system permits one examiner to monitor the physiological parameters and the subjective workload of several subjects in different locations at the same time. Thereby the subjects can move almost freely in any area covered by the mobile network. The mobile handheld allows the popping-up of the questionnaires at flexible time intervals. This electronic input of the dialog data, in comparison to the manual documentation on papers, is more comfortable to the subject as well as to the examiner for an analysis. A Web-based management application facilitates a continuous remote monitoring of the physiological and the

  12. Coast Guard: Opportunities Exist to Further Improve Acquisition Management Capabilities

    DTIC Science & Technology

    2011-04-01

    Coast Guard’s significant acquisition challenges, including project challenges in its Deepwater program. GAO’s prior work on the Coast Guard...to defense readiness. We have reported extensively on the Coast Guard’s significant acquisition challenges, including its Deepwater program, which...prior work on the Deepwater acquisition program identified problems in costs, management, and oversight that have led to delivery delays and other

  13. The Defense Systems Acquisition and Review Council

    DTIC Science & Technology

    1976-09-15

    THE DEFENSE SYSTEMS ACQUISITION AND REVIEW COUNCIL.. A Study of Areas of Consideration Affecting the Functions and Process of Defense Major...COUNfIL: 4 Study of Areas of Considerationi Affecting/he Functions and Process of Defense _- 1 Major Systems Acquisition. , ; O,. v AUTHOR(e) I. C...Studies DSARC -- Functions and Process OSDCAIG *, Army Systems . A - =A -- he Defense Systems Acquisition Review Council (DSARC) was created to assume

  14. 48 CFR 52.251-2 - Interagency Fleet Management System Vehicles and Related Services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Management System Vehicles and Related Services. 52.251-2 Section 52.251-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52.251-2 Interagency Fleet Management System Vehicles and Related...

  15. 48 CFR 52.251-2 - Interagency Fleet Management System Vehicles and Related Services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System Vehicles and Related Services. 52.251-2 Section 52.251-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52.251-2 Interagency Fleet Management System Vehicles and Related...

  16. Guide for the Management of Multinational Programs. A Handbook for Managers Entering the World of International Acquisition. Second Edition

    DTIC Science & Technology

    1987-05-11

    Labor Stability and Ccupensation Practices . . . . 4-9 Management Styles . . . . . . . . . . . . . . . . 4-12 Canadian Relationship to The US...Systýem (PAPS) Milestones and Phases ...... _ . . . 3-8 3-4 Phased Armaments Programminq System(PAPS)/ DoD Systems Acquisition Structural Relationship ...sharing o Armaments cooperation o An understanding of the relationship between economics and security. In concert with the above efforts were various allied

  17. 48 CFR 252.245-7003 - Contractor Property Management System Administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System Administration. 252.245-7003 Section 252.245-7003 Federal Acquisition Regulations System... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.245-7003 Contractor Property Management System Administration. As prescribed in 245.107, insert the following clause: CONTRACTOR PROPERTY MANAGEMENT SYSTEM...

  18. 48 CFR 252.234-7002 - Earned Value Management System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Earned Value Management... of Provisions And Clauses 252.234-7002 Earned Value Management System. As prescribed in 234.203(2), use the following clause: Earned Value Management System (MAY 2011) (a) Definitions. As used in this...

  19. 48 CFR 252.234-7002 - Earned Value Management System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Earned Value Management... of Provisions And Clauses 252.234-7002 Earned Value Management System. As prescribed in 234.203(2), use the following clause: Earned Value Management System (MAY 2011) (a) Definitions. As used in this...

  20. 48 CFR 252.234-7002 - Earned Value Management System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Earned Value Management... of Provisions And Clauses 252.234-7002 Earned Value Management System. As prescribed in 234.203(2), use the following clause: Earned Value Management System (MAY 2011) (a) Definitions. As used in this...

  1. 48 CFR 252.234-7002 - Earned Value Management System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Earned Value Management... of Provisions And Clauses 252.234-7002 Earned Value Management System. As prescribed in 234.203(2), use the following clause: EARNED VALUE MANAGEMENT SYSTEM (MAY 2011) (a) Definitions. As used in this...

  2. 48 CFR 252.234-7002 - Earned Value Management System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Earned Value Management... of Provisions And Clauses 252.234-7002 Earned Value Management System. As prescribed in 234.203(2), use the following clause: Earned Value Management System (APR 2008) (a) In the performance of this...

  3. 48 CFR 52.223-19 - Compliance with Environmental Management Systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Environmental Management Systems. 52.223-19 Section 52.223-19 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.223-19 Compliance with Environmental Management Systems. As prescribed in 23.903, insert the following clause: Compliance With Environmental Management Systems (May 2011) The Contractor's...

  4. Prediction Markets as a Way to Manage Acquisition Programs

    DTIC Science & Technology

    2011-06-01

    volume helps management set production levels, but if management increases advertising it will undermine the market . This becomes critical for the DoD...34 Corporate Strategy Board. Gaspoz, C. (2008). "Prediction markets as an innovative way to manage R&D portfolios." CAiSE Doctoral Consortium. Montpellier...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT Prediction Markets as a Way to Manage Acquisition

  5. Data Acquisition Systems

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Technology developed during a joint research program with Langley and Kinetic Systems Corporation led to Kinetic Systems' production of a high speed Computer Automated Measurement and Control (CAMAC) data acquisition system. The study, which involved the use of CAMAC equipment applied to flight simulation, significantly improved the company's technical capability and produced new applications. With Digital Equipment Corporation, Kinetic Systems is marketing the system to government and private companies for flight simulation, fusion research, turbine testing, steelmaking, etc.

  6. 48 CFR 1649.002-70 - Applicability of the FAR to FEHB acquisitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Applicability of the FAR to FEHB acquisitions. 1649.002-70 Section 1649.002-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT...

  7. 48 CFR 1649.002-70 - Applicability of the FAR to FEHB acquisitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Applicability of the FAR to FEHB acquisitions. 1649.002-70 Section 1649.002-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT...

  8. 48 CFR 1649.002-70 - Applicability of the FAR to FEHB acquisitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Applicability of the FAR to FEHB acquisitions. 1649.002-70 Section 1649.002-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT...

  9. 48 CFR 1649.002-70 - Applicability of the FAR to FEHB acquisitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Applicability of the FAR to FEHB acquisitions. 1649.002-70 Section 1649.002-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT...

  10. 48 CFR 1649.002-70 - Applicability of the FAR to FEHB acquisitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Applicability of the FAR to FEHB acquisitions. 1649.002-70 Section 1649.002-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT...

  11. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Earned Value Management... and Clauses 1852.234-2 Earned Value Management System. As prescribed in 1834.203-70(b) insert the following clause: Earned Value Management System (NOV 2006) (a) In the performance of this contract, the...

  12. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Earned Value Management... and Clauses 1852.234-2 Earned Value Management System. As prescribed in 1834.203-70(b) insert the following clause: Earned Value Management System (NOV 2006) (a) In the performance of this contract, the...

  13. 48 CFR 352.234-4 - Partial earned value management system.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management system. 352.234-4 Section 352.234-4 Federal Acquisition Regulations System HEALTH AND HUMAN....234-4 Partial earned value management system. As prescribed in 334.203-70(d), the Contracting Officer shall insert the following clause: Partial Earned Value Management System (October 2008) (a) The...

  14. 48 CFR 352.234-4 - Partial earned value management system.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management system. 352.234-4 Section 352.234-4 Federal Acquisition Regulations System HEALTH AND HUMAN....234-4 Partial earned value management system. As prescribed in 334.203-70(d), the Contracting Officer shall insert the following clause: Partial Earned Value Management System (October 2008) (a) The...

  15. 48 CFR 352.234-4 - Partial earned value management system.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management system. 352.234-4 Section 352.234-4 Federal Acquisition Regulations System HEALTH AND HUMAN....234-4 Partial earned value management system. As prescribed in 334.203-70(d), the Contracting Officer shall insert the following clause: Partial Earned Value Management System (October 2008) (a) The...

  16. 48 CFR 352.234-4 - Partial earned value management system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management system. 352.234-4 Section 352.234-4 Federal Acquisition Regulations System HEALTH AND HUMAN....234-4 Partial earned value management system. As prescribed in 334.203-70(d), the Contracting Officer shall insert the following clause: Partial Earned Value Management System (October 2008) (a) The...

  17. Environmental Scanning: Acquisition and Use of Information by Managers.

    ERIC Educational Resources Information Center

    Choo, Chun Wei; Auster, Ethel

    1993-01-01

    Defines environmental scanning as the acquisition and use of information about an organization's external environment to assist managers in planning. Highlights include a historical review; organizational theories; information needs and uses; managers as information users; and a review of research on environmental scanning. (Contains 124…

  18. Two Demonstrations with a New Data-Acquisition System

    ERIC Educational Resources Information Center

    Kraftmakher, Yaakov

    2014-01-01

    Nowadays, the use of data-acquisition systems in undergraduate laboratories is routine. Many computer-assisted experiments became possible with the PASCO scientific data-acquisition system based on the 750 Interface and DataStudio software. A new data-acquisition system developed by PASCO includes the 850 Universal Interface and Capstone software.…

  19. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management system. 352.234-3 Section 352.234-3 Federal Acquisition Regulations System HEALTH AND HUMAN....234-3 Full earned value management system. As prescribed in 334.203-70(c), the Contracting Officer shall insert the following clause: Full Earned Value Management System (October 2008) (a) The Contractor...

  20. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management system. 352.234-3 Section 352.234-3 Federal Acquisition Regulations System HEALTH AND HUMAN....234-3 Full earned value management system. As prescribed in 334.203-70(c), the Contracting Officer shall insert the following clause: Full Earned Value Management System (October 2008) (a) The Contractor...

  1. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management system. 352.234-3 Section 352.234-3 Federal Acquisition Regulations System HEALTH AND HUMAN....234-3 Full earned value management system. As prescribed in 334.203-70(c), the Contracting Officer shall insert the following clause: Full Earned Value Management System (October 2008) (a) The Contractor...

  2. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management system. 352.234-3 Section 352.234-3 Federal Acquisition Regulations System HEALTH AND HUMAN....234-3 Full earned value management system. As prescribed in 334.203-70(c), the Contracting Officer shall insert the following clause: Full Earned Value Management System (October 2008) (a) The Contractor...

  3. TFTR diagnostic control and data acquisition system

    NASA Astrophysics Data System (ADS)

    Sauthoff, N. R.; Daniels, R. E.

    1985-05-01

    General computerized control and data-handling support for TFTR diagnostics is presented within the context of the Central Instrumentation, Control and Data Acquisition (CICADA) System. Procedures, hardware, the interactive man-machine interface, event-driven task scheduling, system-wide arming and data acquisition, and a hierarchical data base of raw data and results are described. Similarities in data structures involved in control, monitoring, and data acquisition afford a simplification of the system functions, based on ``groups'' of devices. Emphases and optimizations appropriate for fusion diagnostic system designs are provided. An off-line data reduction computer system is under development.

  4. TFTR diagnostic control and data acquisition system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sauthoff, N.R.; Daniels, R.E.; PPL Computer Division

    1985-05-01

    General computerized control and data-handling support for TFTR diagnostics is presented within the context of the Central Instrumentation, Control and Data Acquisition (CICADA) System. Procedures, hardware, the interactive man--machine interface, event-driven task scheduling, system-wide arming and data acquisition, and a hierarchical data base of raw data and results are described. Similarities in data structures involved in control, monitoring, and data acquisition afford a simplification of the system functions, based on ''groups'' of devices. Emphases and optimizations appropriate for fusion diagnostic system designs are provided. An off-line data reduction computer system is under development.

  5. 48 CFR 252.242-7004 - Material Management and Accounting System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Material Management and... CLAUSES Text of Provisions And Clauses 252.242-7004 Material Management and Accounting System. As prescribed in 242.7204, use the following clause: Material Management and Accounting System (MAY 2011) (a...

  6. 48 CFR 252.242-7004 - Material Management and Accounting System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Material Management and... CLAUSES Text of Provisions And Clauses 252.242-7004 Material Management and Accounting System. As prescribed in 242.7204, use the following clause: Material Management and Accounting System (MAY 2011) (a...

  7. 48 CFR 252.242-7004 - Material Management and Accounting System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Material Management and... CLAUSES Text of Provisions And Clauses 252.242-7004 Material Management and Accounting System. As prescribed in 242.7204, use the following clause: Material Management and Accounting System (MAY 2011) (a...

  8. Description of the SSF PMAD DC testbed control system data acquisition function

    NASA Technical Reports Server (NTRS)

    Baez, Anastacio N.; Mackin, Michael; Wright, Theodore

    1992-01-01

    The NASA LeRC in Cleveland, Ohio has completed the development and integration of a Power Management and Distribution (PMAD) DC Testbed. This testbed is a reduced scale representation of the end to end, sources to loads, Space Station Freedom Electrical Power System (SSF EPS). This unique facility is being used to demonstrate DC power generation and distribution, power management and control, and system operation techniques considered to be prime candidates for the Space Station Freedom. A key capability of the testbed is its ability to be configured to address system level issues in support of critical SSF program design milestones. Electrical power system control and operation issues like source control, source regulation, system fault protection, end-to-end system stability, health monitoring, resource allocation, and resource management are being evaluated in the testbed. The SSF EPS control functional allocation between on-board computers and ground based systems is evolving. Initially, ground based systems will perform the bulk of power system control and operation. The EPS control system is required to continuously monitor and determine the current state of the power system. The DC Testbed Control System consists of standard controllers arranged in a hierarchical and distributed architecture. These controllers provide all the monitoring and control functions for the DC Testbed Electrical Power System. Higher level controllers include the Power Management Controller, Load Management Controller, Operator Interface System, and a network of computer systems that perform some of the SSF Ground based Control Center Operation. The lower level controllers include Main Bus Switch Controllers and Photovoltaic Controllers. Power system status information is periodically provided to the higher level controllers to perform system control and operation. The data acquisition function of the control system is distributed among the various levels of the hierarchy. Data

  9. Feasibility of bridge structural health monitoring using short term data acquisition system.

    DOT National Transportation Integrated Search

    2015-01-01

    Long-term testing of bridges can expensive and result in a large amount of data that is dicult to manage and : analyze. The purpose of this study was to investigate the feasibility of a short-term data acquisition system that : used a minimal numb...

  10. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  11. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  12. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  13. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  14. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  15. 48 CFR 52.204-13 - System for Award Management Maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management Maintenance. 52.204-13 Section 52.204-13 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.204-13 System for Award Management Maintenance. As prescribed in 4.1105(b), use the following clause: System for Award Management Maintenance (JUL 2013) (a) Definitions. As used in this clause...

  16. Event Recording Data Acquisition System and Experiment Data Management System for Neutron Experiments at MLF, J-PARC

    NASA Astrophysics Data System (ADS)

    Nakatani, T.; Inamura, Y.; Moriyama, K.; Ito, T.; Muto, S.; Otomo, T.

    Neutron scattering can be a powerful probe in the investigation of many phenomena in the materials and life sciences. The Materials and Life Science Experimental Facility (MLF) at the Japan Proton Accelerator Research Complex (J-PARC) is a leading center of experimental neutron science and boasts one of the most intense pulsed neutron sources in the world. The MLF currently has 18 experimental instruments in operation that support a wide variety of users from across a range of research fields. The instruments include optical elements, sample environment apparatus and detector systems that are controlled and monitored electronically throughout an experiment. Signals from these components and those from the neutron source are converted into a digital format by the data acquisition (DAQ) electronics and recorded as time-tagged event data in the DAQ computers using "DAQ-Middleware". Operating in event mode, the DAQ system produces extremely large data files (˜GB) under various measurement conditions. Simultaneously, the measurement meta-data indicating each measurement condition is recorded in XML format by the MLF control software framework "IROHA". These measurement event data and meta-data are collected in the MLF common storage and cataloged by the MLF Experimental Database (MLF EXP-DB) based on a commercial XML database. The system provides a web interface for users to manage and remotely analyze experimental data.

  17. The image acquisition system design of floor grinder

    NASA Astrophysics Data System (ADS)

    Wang, Yang-jiang; Liu, Wei; Liu, Hui-qin

    2018-01-01

    Based on linear CCD, high resolution image real-time acquisition system serves as designing a set of image acquisition system for floor grinder through the calculation of optical imaging system. The entire image acquisition system can collect images of ground before and after the work of the floor grinder, and the data is transmitted through the Bluetooth system to the computer and compared to realize real-time monitoring of its working condition. The system provides technical support for the design of unmanned ground grinders.

  18. 48 CFR 252.234-7001 - Notice of Earned Value Management System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Industries Alliance Standard 748, Earned Value Management Systems (ANSI/EIA-748) (current version at time of... Management System. 252.234-7001 Section 252.234-7001 Federal Acquisition Regulations System DEFENSE... CLAUSES Text of Provisions And Clauses 252.234-7001 Notice of Earned Value Management System. As...

  19. 78 FR 29247 - Contractor Legal Management Requirements; Acquisition Regulations; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... DEPARTMENT OF ENERGY 48 CFR Part 952 RIN 1990-AA37 Contractor Legal Management Requirements; Acquisition Regulations; Correction AGENCY: Department of Energy. ACTION: Final rule; correction. SUMMARY: The... (78 FR 25795). In this document, DOE revised existing regulations covering contractor legal management...

  20. Nike Facility Diagnostics and Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Chan, Yung; Aglitskiy, Yefim; Karasik, Max; Kehne, David; Obenschain, Steve; Oh, Jaechul; Serlin, Victor; Weaver, Jim

    2013-10-01

    The Nike laser-target facility is a 56-beam krypton fluoride system that can deliver 2 to 3 kJ of laser energy at 248 nm onto targets inside a two meter diameter vacuum chamber. Nike is used to study physics and technology issues related to laser direct-drive ICF fusion, including hydrodynamic and laser-plasma instabilities, material behavior at extreme pressures, and optical and x-ray diagnostics for laser-heated targets. A suite of laser and target diagnostics are fielded on the Nike facility, including high-speed, high-resolution x-ray and visible imaging cameras, spectrometers and photo-detectors. A centrally-controlled, distributed computerized data acquisition system provides robust data management and near real-time analysis feedback capability during target shots. Work supported by DOE/NNSA.

  1. Optimizing Academic and ESL Acquisition Environments in China's Post-Secondary Education System

    ERIC Educational Resources Information Center

    Guadagni, Donald

    2016-01-01

    The purpose of this article is an examination of methods and result used in modifying classroom management and curriculum delivery in the mainland China post-secondary education system to enhance language acquisition skills. Using hybridized methods to optimize these academic and environmental variables requires merging both national and…

  2. A Survey of Knowledge Management Skills Acquisition in an Online Team-Based Distributed Computing Course

    ERIC Educational Resources Information Center

    Thomas, Jennifer D. E.

    2007-01-01

    This paper investigates students' perceptions of their acquisition of knowledge management skills, namely thinking and team-building skills, resulting from the integration of various resources and technologies into an entirely team-based, online upper level distributed computing (DC) information systems (IS) course. Results seem to indicate that…

  3. Thermal (Silicon Diode) Data Acquisition Systems

    NASA Technical Reports Server (NTRS)

    Wright, Ernest; Kegley, Jeff

    2008-01-01

    Marshall Space Flight Center s X-ray Cryogenic Facility (XRCF) has been performing cryogenic testing to 20 Kelvin since 1999. Two configurations for acquiring data from silicon diode temperature sensors have been implemented at the facility. The facility's environment is recorded via a data acquisition system capable of reading up to 60 silicon diodes. Test article temperature is recorded by a second data acquisition system capable of reading 150+ silicon diodes. The specifications and architecture of both systems will be presented.

  4. Thermal (Silicon Diode) Data Acquisition System

    NASA Technical Reports Server (NTRS)

    Kegley, Jeffrey

    2008-01-01

    Marshall Space Flight Center's X-ray Calibration Facility (XRCF) has been performing cryogenic testing to 20 Kelvin since 1999. Two configurations for acquiring data from silicon diode temperature sensors have been implemented at the facility. The facility's environment is recorded via a data acquisition system capable of reading up to 60 silicon diodes. Test article temperature is recorded by a second data acquisition system capable of reading 150+ silicon diodes. The specifications and architecture of both systems will be presented.

  5. 48 CFR 1052.234-72 - Core Earned Value Management System AUG 2011

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System AUG 2011 1052.234-72 Section 1052.234-72 Federal Acquisition Regulations System DEPARTMENT... and Clauses 1052.234-72 Core Earned Value Management System AUG 2011 As prescribed in DTAR 1034.203... an earned value management system (EVMS). (a) The Contractor shall use an earned value management...

  6. 48 CFR 1052.234-72 - Core Earned Value Management System AUG 2011

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Management System AUG 2011 1052.234-72 Section 1052.234-72 Federal Acquisition Regulations System DEPARTMENT... and Clauses 1052.234-72 Core Earned Value Management System AUG 2011 As prescribed in DTAR 1034.203... an earned value management system (EVMS). (a) The Contractor shall use an earned value management...

  7. 48 CFR 1052.234-72 - Core Earned Value Management System AUG 2011

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management System AUG 2011 1052.234-72 Section 1052.234-72 Federal Acquisition Regulations System DEPARTMENT... and Clauses 1052.234-72 Core Earned Value Management System AUG 2011 As prescribed in DTAR 1034.203... an earned value management system (EVMS). (a) The Contractor shall use an earned value management...

  8. WRATS Integrated Data Acquisition System

    NASA Technical Reports Server (NTRS)

    Piatak, David J.

    2008-01-01

    The Wing and Rotor Aeroelastic Test System (WRATS) data acquisition system (DAS) is a 64-channel data acquisition display and analysis system specifically designed for use with the WRATS 1/5-scale V-22 tiltrotor model of the Bell Osprey. It is the primary data acquisition system for experimental aeroelastic testing of the WRATS model for the purpose of characterizing the aeromechanical and aeroelastic stability of prototype tiltrotor configurations. The WRATS DAS was also used during aeroelastic testing of Bell Helicopter Textron s Quad-Tiltrotor (QTR) design concept, a test which received international attention. The LabVIEW-based design is portable and capable of powering and conditioning over 64 channels of dynamic data at sampling rates up to 1,000 Hz. The system includes a 60-second circular data archive, an integrated model swashplate excitation system, a moving block damping application for calculation of whirl flutter mode subcritical damping, a loads and safety monitor, a pilot-control console display, data analysis capabilities, and instrumentation calibration functions. Three networked computers running custom-designed LabVIEW software acquire data through National Instruments data acquisition hardware. The aeroelastic model (see figure) was tested with the DAS at two facilities at NASA Langley, the Transonic Dynamics Tunnel (TDT) and the Rotorcraft Hover Test Facility (RHTF). Because of the need for seamless transition between testing at these facilities, DAS is portable. The software is capable of harmonic analysis of periodic time history data, Fast Fourier Transform calculations, power spectral density calculations, and on-line calibration of test instrumentation. DAS has a circular buffer archive to ensure critical data is not lost in event of model failure/incident, as well as a sample-and-hold capability for phase-correct time history data.

  9. 48 CFR 1852.234-1 - Notice of Earned Value Management System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Notice of Earned Value Management System. 1852.234-1 Section 1852.234-1 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses 1852.234-1 Notice of...

  10. Development of image and information management system for Korean standard brain

    NASA Astrophysics Data System (ADS)

    Chung, Soon Cheol; Choi, Do Young; Tack, Gye Rae; Sohn, Jin Hun

    2004-04-01

    The purpose of this study is to establish a reference for image acquisition for completing a standard brain for diverse Korean population, and to develop database management system that saves and manages acquired brain images and personal information of subjects. 3D MP-RAGE (Magnetization Prepared Rapid Gradient Echo) technique which has excellent Signal to Noise Ratio (SNR) and Contrast to Noise Ratio (CNR) as well as reduces image acquisition time was selected for anatomical image acquisition, and parameter values were obtained for the optimal image acquisition. Using these standards, image data of 121 young adults (early twenties) were obtained and stored in the system. System was designed to obtain, save, and manage not only anatomical image data but also subjects' basic demographic factors, medical history, handedness inventory, state-trait anxiety inventory, A-type personality inventory, self-assessment depression inventory, mini-mental state examination, intelligence test, and results of personality test via a survey questionnaire. Additionally this system was designed to have functions of saving, inserting, deleting, searching, and printing image data and personal information of subjects, and to have accessibility to them as well as automatic connection setup with ODBC. This newly developed system may have major contribution to the completion of a standard brain for diverse Korean population since it can save and manage their image data and personal information.

  11. On Shaft Data Acquisition System (OSDAS)

    NASA Technical Reports Server (NTRS)

    Pedings, Marc; DeHart, Shawn; Formby, Jason; Naumann, Charles

    2012-01-01

    On Shaft Data Acquisition System (OSDAS) is a rugged, compact, multiple-channel data acquisition computer system that is designed to record data from instrumentation while operating under extreme rotational centrifugal or gravitational acceleration forces. This system, which was developed for the Heritage Fuel Air Turbine Test (HFATT) program, addresses the problem of recording multiple channels of high-sample-rate data on most any rotating test article by mounting the entire acquisition computer onboard with the turbine test article. With the limited availability of slip ring wires for power and communication, OSDAS utilizes its own resources to provide independent power and amplification for each instrument. Since OSDAS utilizes standard PC technology as well as shared code interfaces with the next-generation, real-time health monitoring system (SPARTAA Scalable Parallel Architecture for Real Time Analysis and Acquisition), this system could be expanded beyond its current capabilities, such as providing advanced health monitoring capabilities for the test article. High-conductor-count slip rings are expensive to purchase and maintain, yet only provide a limited number of conductors for routing instrumentation off the article and to a stationary data acquisition system. In addition to being limited to a small number of instruments, slip rings are prone to wear quickly, and introduce noise and other undesirable characteristics to the signal data. This led to the development of a system capable of recording high-density instrumentation, at high sample rates, on the test article itself, all while under extreme rotational stress. OSDAS is a fully functional PC-based system with 48 channels of 24-bit, high-sample-rate input channels, phase synchronized, with an onboard storage capacity of over 1/2-terabyte of solid-state storage. This recording system takes a novel approach to the problem of recording multiple channels of instrumentation, integrated with the test

  12. Data Acquisition Systems

    NASA Technical Reports Server (NTRS)

    1994-01-01

    In the mid-1980s, Kinetic Systems and Langley Research Center determined that high speed CAMAC (Computer Automated Measurement and Control) data acquisition systems could significantly improve Langley's ARTS (Advanced Real Time Simulation) system. The ARTS system supports flight simulation R&D, and the CAMAC equipment allowed 32 high performance simulators to be controlled by centrally located host computers. This technology broadened Kinetic Systems' capabilities and led to several commercial applications. One of them is General Atomics' fusion research program. Kinetic Systems equipment allows tokamak data to be acquired four to 15 times more rapidly. Ford Motor company uses the same technology to control and monitor transmission testing facilities.

  13. Analysis of the possibility of SysML and BPMN application in formal data acquisition system description

    NASA Astrophysics Data System (ADS)

    Ćwikła, G.; Gwiazda, A.; Banaś, W.; Monica, Z.; Foit, K.

    2017-08-01

    The article presents the study of possible application of selected methods of complex description, that can be used as a support of the Manufacturing Information Acquisition System (MIAS) methodology, describing how to design a data acquisition system, allowing for collecting and processing real-time data on the functioning of a production system, necessary for management of a company. MIAS can allow conversion into Cyber-Physical Production System. MIAS is gathering and pre-processing data on the state of production system, including e.g. realisation of production orders, state of machines, materials and human resources. Systematised approach and model-based development is proposed for improving the quality of the design of MIAS methodology-based complex systems supporting data acquisition in various types of companies. Graphical specification can be the baseline for any model-based development in specified areas. The possibility of application of SysML and BPMN, both being UML-based languages, representing different approaches to modelling of requirements, architecture and implementation of the data acquisition system, as a tools supporting description of required features of MIAS, were considered.

  14. Assess program: Interactive data management systems for airborne research

    NASA Technical Reports Server (NTRS)

    Munoz, R. M.; Reller, J. O., Jr.

    1974-01-01

    Two data systems were developed for use in airborne research. Both have distributed intelligence and are programmed for interactive support among computers and with human operators. The C-141 system (ADAMS) performs flight planning and telescope control functions in addition to its primary role of data acquisition; the CV-990 system (ADDAS) performs data management functions in support of many research experiments operating concurrently. Each system is arranged for maximum reliability in the first priority function, precision data acquisition.

  15. Spectral Dynamics Inc., ships hybrid, 316-channel data acquisition system to Sandia Labs.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwartz, Douglas

    2003-09-01

    Spectral Dynamics announced the shipment of a 316-channel data acquisition system. The system was custom designed for the Light Initiated High Explosive (LIHE) facility at Sandia Labs in Albuquerque, New Mexico by Spectral Dynamics Advanced Research Products Group. This Spectral Dynamics data acquisition system was tailored to meet the unique LIHE environmental and testing requirements utilizing Spectral Dynamics commercial off the shelf (COTS) Jaguar and VIDAS products supplemented by SD Alliance partner's (COTS) products. 'This system is just the beginning of our cutting edge merged technology solutions,' stated Mark Remelman, Manager for the Spectral Dynamics Advanced Research Products Group. 'Thismore » Hybrid system has 316-channels of data acquisition capability, comprised of 102.4kHz direct to disk acquisition and 2.5MHz, 200Mhz & 500Mhz RAM based capabilities. In addition it incorporates the advanced bridge conditioning and dynamic configuration capabilities offered by Spectral Dynamics new Smart Interface Panel System (SIPS{trademark}).' After acceptance testing, Tony King, the Instrumentation Engineer facilitating the project for the Sandia LIHE group commented; 'The LIHE staff was very impressed with the design, construction, attention to detail and overall performance of the instrumentation system'. This system combines VIDAS, a leading edge fourth generation SD-VXI hardware and field-proven software system from SD's Advanced Research Products Group with SD's Jaguar, a multiple Acquisition Control Peripheral (ACP) system that allows expansion to hundreds of channels without sacrificing signal processing performance. Jaguar incorporates dedicated throughput disks for each ACP providing time streaming to disk at up to the maximum sample rate. Spectral Dynamics, Inc. is a leading worldwide supplier of systems and software for advanced computer-automated data acquisition, vibration testing, structural dynamics, explosive shock, high-speed transient

  16. Isothermal thermogravimetric data acquisition analysis system

    NASA Technical Reports Server (NTRS)

    Cooper, Kenneth, Jr.

    1991-01-01

    The description of an Isothermal Thermogravimetric Analysis (TGA) Data Acquisition System is presented. The system consists of software and hardware to perform a wide variety of TGA experiments. The software is written in ANSI C using Borland's Turbo C++. The hardware consists of a 486/25 MHz machine with a Capital Equipment Corp. IEEE488 interface card. The interface is to a Hewlett Packard 3497A data acquisition system using two analog input cards and a digital actuator card. The system provides for 16 TGA rigs with weight and temperature measurements from each rig. Data collection is conducted in three phases. Acquisition is done at a rapid rate during initial startup, at a slower rate during extended data collection periods, and finally at a fast rate during shutdown. Parameters controlling the rate and duration of each phase are user programmable. Furnace control (raising and lowering) is also programmable. Provision is made for automatic restart in the event of power failure or other abnormal terminations. Initial trial runs were conducted to show system stability.

  17. Value-informed space systems design and acquisition

    NASA Astrophysics Data System (ADS)

    Brathwaite, Joy

    -centric approach are identified and discussed. In addition, an innovative approach for characterizing value uncertainty through partial moments, a technique used in finance, is adapted to an engineering context and applied to priced space systems. Partial moments disaggregate uncertainty into upside potential and downside risk, and as such, they provide the decision-maker with additional insights for value-uncertainty management in design and acquisition. For unpriced space systems, this research first posits that their value derives from, and can be assessed through, the value of information they provide. To this effect, a Bayesian framework is created to assess system value in which the system is viewed as an information provider and the stakeholder an information recipient. Information has value to stakeholders as it changes their rational beliefs enabling them to yield higher expected pay-offs. Based on this marginal increase in expected pay-offs, a new metric, Value-of-Design (VoD), is introduced to quantify the unpriced system’s value. The Bayesian framework is applied to the case of an Earth Science satellite that provides hurricane information to oil rig operators using nested Monte Carlo modeling and simulation. Probability models of stakeholders’ beliefs, and economic models of pay-offs are developed and integrated with a spacecraft payload generation tool. The case study investigates the information value generated by each payload, with results pointing to clusters of payload instruments that yielded higher information value, and minimum information thresholds below which it is difficult to justify the acquisition of the system. In addition, an analytical decision tool, probabilistic Pareto fronts, is developed in the Cost-VoD trade space to provide the decision-maker with additional insights into the coupling of a system's probable value generation and its associated cost risk.

  18. 48 CFR 945.570-2 - Acquisition of motor vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Acquisition of motor... Acquisition of motor vehicles. (a) The GSA Interagency Fleet Management System (GSA-IFMS) is the first source of supply for providing motor vehicles to contractors; however, contracting officer approval is...

  19. 48 CFR 945.570-2 - Acquisition of motor vehicles.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Acquisition of motor... Acquisition of motor vehicles. (a) The GSA Interagency Fleet Management System (GSA-IFMS) is the first source of supply for providing motor vehicles to contractors; however, contracting officer approval is...

  20. Defense Acquisition Workforce: DOD Has Opportunities to Further Enhance Use and Management of Development Fund

    DTIC Science & Technology

    2017-03-01

    DEFENSE ACQUISITION WORKFORCE DOD Has Opportunities to Further Enhance Use and Management of Development Fund...House of Representatives March 2017 DEFENSE ACQUISITION WORKFORCE DOD Has Opportunities to Further Enhance Use and Management of Development Fund...Year Is Expected to Decrease Significantly by Fiscal Year 2018 In the past year, DOD has taken several actions to improve its management and

  1. 48 CFR 970.2301 - Sustainable acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 970.2301 Section 970.2301 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301 Sustainable acquisition...

  2. 48 CFR 970.2301 - Sustainable acquisition.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... 970.2301 Section 970.2301 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301 Sustainable acquisition. ...

  3. 48 CFR 970.2301 - Sustainable acquisition.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... 970.2301 Section 970.2301 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301 Sustainable acquisition. ...

  4. 48 CFR 970.2301 - Sustainable acquisition.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... 970.2301 Section 970.2301 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301 Sustainable acquisition. ...

  5. 48 CFR 970.2301 - Sustainable acquisition.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... 970.2301 Section 970.2301 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301 Sustainable acquisition. ...

  6. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  7. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  8. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  9. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  10. Centaur propellant acquisition system study

    NASA Technical Reports Server (NTRS)

    Blatt, M. H.; Walter, M. D.

    1975-01-01

    A study was performed to determine the desirability of replacing the hydrogen peroxide settling system on the Centaur D-1S with a capillary acquisition system. A comprehensive screening was performed to select the most promising capillary device fluid acquisition, thermal conditioning, and fabrication techniques. Refillable start baskets and bypass feed start tanks were selected for detailed design. Critical analysis areas were settling and refilling, start sequence development with an initially dry boost pump, and cooling the fluid delivered to the boost pump in order to provide necessary net position suction head (NPSH). Design drawings were prepared for the start basket and start tank concepts for both LO2 and LH2 tanks. System comparisons indicated that the start baskets using wicking for thermal conditioning, and thermal subcooling for boost pump NPSH, are the most desirable systems for future development.

  11. The Requirement for Acquisition and Logistics Integration: An Examination of Reliability Management Within the Marine Corps Acquisition Process

    DTIC Science & Technology

    2002-12-01

    HMMWV family of vehicles, LVS family of vehicles, and the M198 Howitzer). The analysis is limited to an assessment of reliability management issues...AND LOGISTICS INTEGRATION: AN EXAMINATION OF RELIABILITY MANAGEMENT WITHIN THE MARINE CORPS ACQUISITION PROCESS by Marvin L. Norcross, Jr...Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction

  12. 48 CFR 252.251-7001 - Use of Interagency Fleet Management System (IFMS) vehicles and related services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Use of Interagency Fleet Management System (IFMS) vehicles and related services. 252.251-7001 Section 252.251-7001 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT...

  13. The new classic data acquisition system for NPOI

    NASA Astrophysics Data System (ADS)

    Sun, B.; Jorgensen, A. M.; Landavazo, M.; Hutter, D. J.; van Belle, G. T.; Mozurkewich, David; Armstrong, J. T.; Schmitt, H. R.; Baines, E. K.; Restaino, S. R.

    2014-07-01

    The New Classic data acquisition system is an important portion of a new project of stellar surface imaging with the NPOI, funded by the National Science Foundation, and enables the data acquisition necessary for the project. The NPOI can simultaneously deliver beams from 6 telescopes to the beam combining facility, and in the Classic beam combiner these are combined 4 at a time on 3 separate spectrographs with all 15 possible baselines observed. The Classic data acquisition system is limited to 16 of 32 wavelength channels on two spectrographs and limited to 30 s integrations followed by a pause to ush data. Classic also has some limitations in its fringe-tracking capability. These factors, and the fact that Classic incorporates 1990s technology which cannot be easily replaced are motivation for upgrading the data acquisition system. The New Classic data acquisition system is based around modern electronics, including a high-end Stratix FPGA, a 200 MB/s Direct Memory Access card, and a fast modern Linux computer. These allow for continuous recording of all 96 channels across three spectrographs, increasing the total amount of data recorded by a an estimated order of magnitude. The additional computing power on the data acquisition system also allows for the implementation of more sophisticated fringe-tracking algorithms which are needed for the Stellar Surface Imaging project. In this paper we describe the New Classic system design and implementation, describe the background and motivation for the system as well as show some initial results from using it.

  14. A Real-Time Image Acquisition And Processing System For A RISC-Based Microcomputer

    NASA Astrophysics Data System (ADS)

    Luckman, Adrian J.; Allinson, Nigel M.

    1989-03-01

    A low cost image acquisition and processing system has been developed for the Acorn Archimedes microcomputer. Using a Reduced Instruction Set Computer (RISC) architecture, the ARM (Acorn Risc Machine) processor provides instruction speeds suitable for image processing applications. The associated improvement in data transfer rate has allowed real-time video image acquisition without the need for frame-store memory external to the microcomputer. The system is comprised of real-time video digitising hardware which interfaces directly to the Archimedes memory, and software to provide an integrated image acquisition and processing environment. The hardware can digitise a video signal at up to 640 samples per video line with programmable parameters such as sampling rate and gain. Software support includes a work environment for image capture and processing with pixel, neighbourhood and global operators. A friendly user interface is provided with the help of the Archimedes Operating System WIMP (Windows, Icons, Mouse and Pointer) Manager. Windows provide a convenient way of handling images on the screen and program control is directed mostly by pop-up menus.

  15. Data Acquisition and Real-Time Systems.

    ERIC Educational Resources Information Center

    Lawrence, D. E., Ed.; Fenwick, P. M., Ed.

    The first group of papers starts with a tutorial paper which surveys the methods used in data acquisition systems. Other papers in this group describe: (1) some problems involved in the computer acquisition of high-speed randomly-occurring data and the protection of this data from accidental corruption, (2) an input/output bus to allow an IBM…

  16. An operational, multistate, earth observation data management system

    NASA Technical Reports Server (NTRS)

    Eastwood, L. F., Jr.; Hill, C. T.; Morgan, R. P.; Gohagan, J. K.; Hays, T. R.; Ballard, R. J.; Crnkovich, G. G.; Schaeffer, M. A.

    1977-01-01

    State, local, and regional agencies involved in natural resources management were investigated as potential users of satellite remotely sensed data. This group's needs are assessed and alternative data management systems serving some of those needs are outlined. It is concluded that an operational earth observation data management system will be of most use to these user agencies if it provides a full range of information services -- from raw data acquisition to interpretation and dissemination of final information products.

  17. Online decision support system for surface irrigation management

    NASA Astrophysics Data System (ADS)

    Wang, Wenchao; Cui, Yuanlai

    2017-04-01

    Irrigation has played an important role in agricultural production. Irrigation decision support system is developed for irrigation water management, which can raise irrigation efficiency with few added engineering services. An online irrigation decision support system (OIDSS), in consist of in-field sensors and central computer system, is designed for surface irrigation management in large irrigation district. Many functions have acquired in OIDSS, such as data acquisition and detection, real-time irrigation forecast, water allocation decision and irrigation information management. The OIDSS contains four parts: Data acquisition terminals, Web server, Client browser and Communication system. Data acquisition terminals are designed to measure paddy water level, soil water content in dry land, ponds water level, underground water level, and canals water level. A web server is responsible for collecting meteorological data, weather forecast data, the real-time field data, and manager's feedback data. Water allocation decisions are made in the web server. Client browser is responsible for friendly displaying, interacting with managers, and collecting managers' irrigation intention. Communication system includes internet and the GPRS network used by monitoring stations. The OIDSS's model is based on water balance approach for both lowland paddy and upland crops. Considering basic database of different crops water demands in the whole growth stages and irrigation system engineering information, the OIDSS can make efficient decision of water allocation with the help of real-time field water detection and weather forecast. This system uses technical methods to reduce requirements of user's specialized knowledge and can also take user's managerial experience into account. As the system is developed by the Browser/Server model, it is possible to make full use of the internet resources, to facilitate users at any place where internet exists. The OIDSS has been applied in

  18. System Description for Tank 241-AZ-101 Waste Retrieval Data Acquisition System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROMERO, S.G.

    2000-01-10

    Describes the hardware and software for the AZ-101 Mixer Pump Data Acquisition System. The purpose of the tank 241-AZ-101 retrieval system Data Acquisition System (DAS) is to provide monitoring and data acquisition of key parameters in order to confirm the effectiveness of the mixer pumps utilized for suspending solids in the tank. The suspension of solids in Tank 241-AZ-101 is necessary for pretreatment of the neutralized current acid waste (NCAW), and eventual disposal as glass via the Hanford Waste Vitrification Plant.

  19. A data acquisition system for marine and ecological research.

    NASA Technical Reports Server (NTRS)

    Johnson, R. A.

    1971-01-01

    Description of a self-contained portable data acquisition system for use in marine and ecological research. The compact lightweight data acquisition system is capable of recording 14 variables in its present configuration and is suitable for use in either a boat, pickup truck, or light aircraft. This system will provide the acquisition of reliable data on the structure of the environment and the effect of man-made and natural activities on the observed phenomenon. Utilizing both self-contained analog recording and a telemetry transmitter for real-time digital readout and recording, the prototype system has undergone extensive testing. Currently undergoing component performance upgrading, the prototype system has been utilized in several environmental science investigations associated with air pollution investigations and weather modification and is currently being used for marine data acquisition.

  20. Magnetic Field Response Measurement Acquisition System

    NASA Technical Reports Server (NTRS)

    Woodard, Stanley E.; Taylor,Bryant D.; Shams, Qamar A.; Fox, Robert L.

    2007-01-01

    This paper presents a measurement acquisition method that alleviates many shortcomings of traditional measurement systems. The shortcomings are a finite number of measurement channels, weight penalty associated with measurements, electrical arcing, wire degradations due to wear or chemical decay and the logistics needed to add new sensors. Wire degradation has resulted in aircraft fatalities and critical space launches being delayed. The key to this method is the use of sensors designed as passive inductor-capacitor circuits that produce magnetic field responses. The response attributes correspond to states of physical properties for which the sensors measure. Power is wirelessly provided to the sensing element by using Faraday induction. A radio frequency antenna produces a time-varying magnetic field used to power the sensor and receive the magnetic field response of the sensor. An interrogation system for discerning changes in the sensor response frequency, resistance and amplitude has been developed and is presented herein. Multiple sensors can be interrogated using this method. The method eliminates the need for a data acquisition channel dedicated to each sensor. The method does not require the sensors to be near the acquisition hardware. Methods of developing magnetic field response sensors and the influence of key parameters on measurement acquisition are discussed. Examples of magnetic field response sensors and the respective measurement characterizations are presented. Implementation of this method on an aerospace system is discussed.

  1. 40 CFR 205.54-2 - Sound data acquisition system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... meets the “fast” dynamic requirement of a precision sound level meter indicating meter system for the... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Sound data acquisition system. 205.54... data acquisition system. (a) Systems employing tape recorders and graphic level recorders may be...

  2. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  3. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  4. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  5. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  6. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  7. Effects of a Vocabulary Acquisition and Assessment System on Students' Performance in a Blended Learning Class for English Subject

    ERIC Educational Resources Information Center

    Jia, Jiyou; Chen, Yuhao; Ding, Zhuhui; Ruan, Meixian

    2012-01-01

    Vocabulary acquisition and assessment are regarded as the key basis for the instruction of English as a second language. However, it is time-consuming, fallible and repetitive for the school teachers and parents to assess the proficiency of the students' vocabulary acquisition. We customized the open source course management system Moodle to build…

  8. Control and acquisition system of a space instrument for cosmic ray measurement

    NASA Astrophysics Data System (ADS)

    Prieto, M.; Martín, C.; Quesada, M.; Meziat, D.; Medina, J.; Sánchez, S.; Rodríguez-Frías, M. D.

    2000-04-01

    The PESCA Instrument Control and Acquisition System (PICAS) design, building and tests are presented. The purpose of the PESCA instrument is the study of the Solar Energetic Particles and the Anomalous Cosmic Rays. It is, therefore, a satellite on-board instrument. The PICAS is basically a computer, composed of a microprocessor with a memory block and a set of interfaces for the communication with the rest of the instrument and the satellite. The PICAS manages all the comunication processes with the satellite, that comprises the order reception from the ground station, and the telemetry sending, that includes scientific data and housekeeping data. By means of telecommands, the PICAS is completely controllable from the ground. The PICAS is also a reliable data acquisition system that guarantees the correct reception of the Cosmic Rays data collected in the ground.

  9. Acquisitions and Collection Development Automation: Future Directions.

    ERIC Educational Resources Information Center

    Aveney, Brian; Heinemann, Luba

    1983-01-01

    This paper explores features of automated acquisitions systems now implemented and discusses features that might be implemented in the next few years. Distributed acquisitions, ordering, receiving, reconciliation, management reporting, and collection development (selection of current materials, retrospective purchasing, and comparative…

  10. The health hazard assessment process in support of joint weapon system acquisitions.

    PubMed

    Kluchinsky, Timothy A; Jokel, Charles R; Cambre, John V; Goddard, Donald E; Batts, Robert W

    2013-01-01

    Since 1981, the Army's HHA Program has provided an invaluable service to combat developers and materiel program managers by providing recommendations designed to eliminate or control health hazards associated with materiel and weapon systems. The program has consistently strived to improve its services by providing more meaningful and efficient assistance to the acquisition community. In the uncertain fiscal times ahead, the Army's HHA Program will continue to provide valuable and cost-effective solutions to mitigate the health risks of weapons systems.

  11. The Unicorn Collection Management System: Its Structure and Features.

    ERIC Educational Resources Information Center

    Young, Jacky; Veatch, James R., Jr.

    1988-01-01

    Discusses the design principles behind the Unicorn Collection Management System, an integrated library system which includes modules for bibliographic and inventory control, circulation, academic reserves, serials control, authority control, acquisition, electronic mail, bulletin board, and enhanced public access. The flexibility of the system is…

  12. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1990-01-01

    Archival reports on developments in programs managed by the JPL Office of Telecommunications and Data Acquisition (TDA) are provided. Topics covered include: DSN advanced systems (tracking and ground-based navigation; communications, spacecraft-ground; and station control and system technology) and DSN systems implementation (capabilities for existing projects; capabilities for new projects; TDA program management and analysis; and Goldstone solar system radar).

  13. Budget Uncertainty and Business Management Reform in the Department of Defense: Some Considerations for Acquisition Management

    DTIC Science & Technology

    2007-04-30

    top-line. While this would seem to be good news for the acquisition community, recent increases in the defense top-line, largely related to the war...Lopez, T. C. (2005). Smart operations office formed at pentagon. Air Force Print News , 11 May 2005. McCarthy, J. D. (2006). The case for ...A. Brook, PhD, Director, Center for Defense Management Reform, Naval Postgraduate School 4th Annual Acquisition Research Symposium of the Naval

  14. Insurance Contract Analysis for Company Decision Support in Acquisition Management

    NASA Astrophysics Data System (ADS)

    Chernovita, H. P.; Manongga, D.; Iriani, A.

    2017-01-01

    One of company activities to retain their business is marketing the products which include in acquisition management to get new customers. Insurance contract analysis using ID3 to produce decision tree and rules to be decision support for the insurance company. The decision tree shows 13 rules that lead to contract termination claim. This could be a guide for the insurance company in acquisition management to prevent contract binding with these contract condition because it has a big chance for the customer to terminate their insurance contract before its expired date. As the result, there are several strong points that could be the determinant of contract termination such as: 1) customer age whether too young or too old, 2) long insurance period (above 10 years), 3) big insurance amount, 4) big amount of premium charges, and 5) payment method.

  15. What Program Managers Need to Know: A New Book to Accelerate Acquisition Competence

    DTIC Science & Technology

    2015-02-01

    FEB 2015 2. REPORT TYPE 3. DATES COVERED 00-00-2015 to 00-00-2015 4. TITLE AND SUBTITLE What Program Managers Need to Know: A New Book to...Accelerate Acquisition Competence 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f...ANSI Std Z39-18 What Program Managers Need to Know A New Book to Accelerate Acquisition Competence Col. William T. Cooley n Brian C. Ruhm Cooley is

  16. An Analysis of Program Managers as Total Life Cycle Systems Managers

    DTIC Science & Technology

    2017-09-01

    S) AND ADDRESS(ES) N/A 10. SPONSORING / MONITORING AGENCY REPORT NUMBER 11. SUPPLEMENTARY NOTES The views expressed in this thesis are those of...Total Life Cycle Systems Management (TLCSM) is a term used in Army Regulation ( AR ) 70-1 to describe the responsibility of the Army Program Manager (PM...away from the PM. However, other Army guidance challenges AR 70-1 when transitioning to the Operations and Support phase of the acquisition life

  17. Magnetic Field Response Measurement Acquisition System

    NASA Technical Reports Server (NTRS)

    Woodard, Stanley E.; Taylor, Bryant D.; Shams, Qamar A.; Fox, Robert L.

    2005-01-01

    A measurement acquisition method that alleviates many shortcomings of traditional measurement systems is presented in this paper. The shortcomings are a finite number of measurement channels, weight penalty associated with measurements, electrical arcing, wire degradations due to wear or chemical decay and the logistics needed to add new sensors. The key to this method is the use of sensors designed as passive inductor-capacitor circuits that produce magnetic field responses. The response attributes correspond to states of physical properties for which the sensors measure. A radio frequency antenna produces a time-varying magnetic field used to power the sensor and receive the magnetic field response of the sensor. An interrogation system for discerning changes in the sensor response is presented herein. Multiple sensors can be interrogated using this method. The method eliminates the need for a data acquisition channel dedicated to each sensor. Methods of developing magnetic field response sensors and the influence of key parameters on measurement acquisition are discussed.

  18. A new acquisition and imaging system for environmental measurements: an experience on the Italian cultural heritage.

    PubMed

    Leccese, Fabio; Cagnetti, Marco; Calogero, Andrea; Trinca, Daniele; di Pasquale, Stefano; Giarnetti, Sabino; Cozzella, Lorenzo

    2014-05-23

    A new acquisition system for remote control of wall paintings has been realized and tested in the field. The system measures temperature and atmospheric pressure in an archeological site where a fresco has been put under control. The measuring chain has been designed to be used in unfavorable environments where neither electric power nor telecommunication infrastructures are available. The environmental parameters obtained from the local monitoring are then transferred remotely allowing an easier management by experts in the field of conservation of cultural heritage. The local acquisition system uses an electronic card based on microcontrollers and sends the data to a central unit realized with a Raspberry-Pi. The latter manages a high quality camera to pick up pictures of the fresco. Finally, to realize the remote control at a site not reached by internet signals, a WiMAX connection based on different communication technologies such as WiMAX, Ethernet, GPRS and Satellite, has been set up.

  19. A New Acquisition and Imaging System for Environmental Measurements: An Experience on the Italian Cultural Heritage

    PubMed Central

    Leccese, Fabio; Cagnetti, Marco; Calogero, Andrea; Trinca, Daniele; di Pasquale, Stefano; Giarnetti, Sabino; Cozzella, Lorenzo

    2014-01-01

    A new acquisition system for remote control of wall paintings has been realized and tested in the field. The system measures temperature and atmospheric pressure in an archeological site where a fresco has been put under control. The measuring chain has been designed to be used in unfavorable environments where neither electric power nor telecommunication infrastructures are available. The environmental parameters obtained from the local monitoring are then transferred remotely allowing an easier management by experts in the field of conservation of cultural heritage. The local acquisition system uses an electronic card based on microcontrollers and sends the data to a central unit realized with a Raspberry-Pi. The latter manages a high quality camera to pick up pictures of the fresco. Finally, to realize the remote control at a site not reached by internet signals, a WiMAX connection based on different communication technologies such as WiMAX, Ethernet, GPRS and Satellite, has been set up. PMID:24859030

  20. An Analysis of Turkey’s Defense Systems Acquisition Policy

    DTIC Science & Technology

    2009-03-01

    i NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT An Analysis of Turkey’s Defense Systems Acquisition...2009 3. REPORT TYPE AND DATES COVERED MBA THESIS 4. TITLE AND SUBTITLE An Analysis of Turkey’s Defense Systems Acquisition Policy 6. AUTHOR(S...DISTRIBUTION CODE 13. ABSTRACT (maximum 200 words) The purpose of this MBA thesis is to analyze Turkey’s defense systems acquisition policy and

  1. The NIFFTE Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Qu, Hai; Niffte Collaboration

    2011-10-01

    The Neutron Induced Fission Fragment Tracking Experiment (NIFFTE) will employ a novel, high granularity, pressurized Time Projection Chamber to measure fission cross-sections of the major actinides to high precision over a wide incident neutron energy range. These results will improve nuclear data accuracy and benefit the fuel cycle in the future. The NIFFTE data acquisition system (DAQ) has been designed and implemented on the prototype TPC. Lessons learned from engineering runs have been incorporated into some design changes that are being implemented before the next run cycle. A fully instrumented sextant of EtherDAQ cards (16 sectors, 496 channels) will be used for the next run cycle. The Maximum Integrated Data Acquisition System (MIDAS) has been chosen and customized to configure and run the experiment. It also meets the requirement for remote control and monitoring of the system. The integration of the MIDAS online database with the persistent PostgreSQL database has been implemented for experiment usage. The detailed design and current status of the DAQ system will be presented.

  2. 48 CFR 1642.7001 - Management agreement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Management agreement. 1642.7001 Section 1642.7001 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Management...

  3. 48 CFR 1642.7001 - Management agreement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Management agreement. 1642.7001 Section 1642.7001 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Management...

  4. 48 CFR 1642.7001 - Management agreement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Management agreement. 1642.7001 Section 1642.7001 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Management...

  5. 48 CFR 1642.7001 - Management agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Management agreement. 1642.7001 Section 1642.7001 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Management...

  6. Data acquisition system for operational earth observation missions

    NASA Technical Reports Server (NTRS)

    Deerwester, J. M.; Alexander, D.; Arno, R. D.; Edsinger, L. E.; Norman, S. M.; Sinclair, K. F.; Tindle, E. L.; Wood, R. D.

    1972-01-01

    The data acquisition system capabilities expected to be available in the 1980 time period as part of operational Earth observation missions are identified. By data acquisition system is meant the sensor platform (spacecraft or aircraft), the sensors themselves and the communication system. Future capabilities and support requirements are projected for the following sensors: film camera, return beam vidicon, multispectral scanner, infrared scanner, infrared radiometer, microwave scanner, microwave radiometer, coherent side-looking radar, and scatterometer.

  7. An operational, multistate, earth observation data management system

    NASA Technical Reports Server (NTRS)

    Eastwood, L. F., Jr.; Hays, T. R.; Hill, C. T.; Ballard, R. J.; Morgan, R. P.; Crnkovich, G. G.; Gohagan, J. K.; Schaeffer, M. A.

    1977-01-01

    The purpose of this paper is to investigate a group of potential users of satellite remotely sensed data - state, local, and regional agencies involved in natural resources management. We assess this group's needs in five states and outline alternative data management systems to serve some of those needs. We conclude that an operational Earth Observation Data Management System (EODMS) will be of most use to these user agencies if it provides a full range of information services - from raw data acquisition to interpretation and dissemination of final information products.

  8. Increasingly automated procedure acquisition in dynamic systems

    NASA Technical Reports Server (NTRS)

    Mathe, Nathalie; Kedar, Smadar

    1992-01-01

    Procedures are widely used by operators for controlling complex dynamic systems. Currently, most development of such procedures is done manually, consuming a large amount of paper, time, and manpower in the process. While automated knowledge acquisition is an active field of research, not much attention has been paid to the problem of computer-assisted acquisition and refinement of complex procedures for dynamic systems. The Procedure Acquisition for Reactive Control Assistant (PARC), which is designed to assist users in more systematically and automatically encoding and refining complex procedures. PARC is able to elicit knowledge interactively from the user during operation of the dynamic system. We categorize procedure refinement into two stages: diagnosis - diagnose the failure and choose a repair - and repair - plan and perform the repair. The basic approach taken in PARC is to assist the user in all steps of this process by providing increased levels of assistance with layered tools. We illustrate the operation of PARC in refining procedures for the control of a robot arm.

  9. Magnetic-Field-Response Measurement-Acquisition System

    NASA Technical Reports Server (NTRS)

    Woodward, Stanley E.; Shams, Qamar A.; Fox, Robert L.; Taylor, Bryant D.

    2006-01-01

    A measurement-acquisition system uses magnetic fields to power sensors and to acquire measurements from sensors. The system alleviates many shortcomings of traditional measurement-acquisition systems, which include a finite number of measurement channels, weight penalty associated with wires, use limited to a single type of measurement, wire degradation due to wear or chemical decay, and the logistics needed to add new sensors. Eliminating wiring for acquiring measurements can alleviate potential hazards associated with wires, such as damaged wires becoming ignition sources due to arcing. The sensors are designed as electrically passive inductive-capacitive or passive inductive-capacitive-resistive circuits that produce magnetic-field-responses. One or more electrical parameters (inductance, capacitance, and resistance) of each sensor can be variable and corresponds to a measured physical state of interest. The magnetic-field- response attributes (frequency, amplitude, and bandwidth) of the inductor correspond to the states of physical properties for which each sensor measures. For each sensor, the measurement-acquisition system produces a series of increasing magnetic-field harmonics within a frequency range dedicated to that sensor. For each harmonic, an antenna electrically coupled to an oscillating current (the frequency of which is that of the harmonic) produces an oscillating magnetic field. Faraday induction via the harmonic magnetic fields produces an electromotive force and therefore a current in the sensor. Once electrically active, the sensor produces its own harmonic magnetic field as the inductor stores and releases magnetic energy. The antenna of the measurement- acquisition system is switched from a transmitting to a receiving mode to acquire the magnetic-field response of the sensor. The rectified amplitude of the received response is compared to previous responses to prior transmitted harmonics, to ascertain if the measurement system has detected a

  10. 48 CFR 945.570-2 - Acquisition of motor vehicles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... vehicles. 945.570-2 Section 945.570-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT... Acquisition of motor vehicles. (a) The GSA Interagency Fleet Management System (GSA-IFMS) is the first source of supply for providing motor vehicles to contractors; however, contracting officer approval is...

  11. The ATLAS Data Acquisition System in LHC Run 2

    NASA Astrophysics Data System (ADS)

    Panduro Vazquez, William; ATLAS Collaboration

    2017-10-01

    The LHC has been providing pp collisions with record luminosity and energy since the start of Run 2 in 2015. The Trigger and Data Acquisition system of the ATLAS experiment has been upgraded to deal with the increased performance required by this new operational mode. The dataflow system and associated network infrastructure have been reshaped in order to benefit from technological progress and to maximize the flexibility and efficiency of the data selection process. The new design is radically different from the previous implementation both in terms of architecture and performance, with the previous two-level structure merged into a single processing farm, performing incremental data collection and analysis. In addition, logical farm slicing, with each slice managed by a dedicated supervisor, has been dropped in favour of global management by a single farm master operating at 100 kHz. This farm master has also been integrated with a new software-based Region of Interest builder, replacing the previous VMEbus-based system. Finally, the Readout system has been completely refitted with new higher performance, lower footprint server machines housing a new custom front-end interface card. Here we will cover the overall design of the system, along with performance results from the start-up phase of LHC Run 2.

  12. Advanced Data Acquisition Systems with Self-Healing Circuitry

    NASA Technical Reports Server (NTRS)

    Larson, William E.; Ihlefeld, Curtis M.; Medelius, Pedro J.; Delgado, H. (Technical Monitor)

    2001-01-01

    Kennedy Space Center's Spaceport Engineering & Technology Directorate has developed a data acquisition system that will help drive down the cost of ground launch operations. This system automates both the physical measurement set-up function as well as configuration management documentation. The key element of the system is a self-configuring, self-calibrating, signal-conditioning amplifier that automatically adapts to any sensor to which it is connected. This paper will describe the core technology behind this device and the automated data system in which it has been integrated. The paper will also describe the revolutionary enhancements that are planned for this innovative measurement technology. All measurement electronics devices contain circuitry that, if it fails or degrades, requires the unit to be replaced, adding to the cost of operations. Kennedy Space Center is now developing analog circuits that will be able to detect their own failure and dynamically reconfigure their circuitry to restore themselves to normal operation. This technology will have wide ranging application in all electronic devices used in space and ground systems.

  13. Civilian Radioactive Waste Management System Requirements Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by

  14. Impacts of Space System Acquisition on National Security

    DTIC Science & Technology

    2012-12-01

    and observation have indicated that differences in the theory and practice of acquisition, conflicts in values among the acquisition community, and...budgets, requirements and acquisition. The “DAPA Report January 2006,” states, “In theory , new weapon systems are delivered as the result of the... stockholder confidence.86 Additionally, the “DAPA Executive Report December 2005” states: “While each of these sets of values is legitimate, pursuing them

  15. War-gaming application for future space systems acquisition

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2016-05-01

    Recently the U.S. Department of Defense (DOD) released the Defense Innovation Initiative (DII) [1] to focus DOD on five key aspects; Aspect #1: Recruit talented and innovative people, Aspect #2: Reinvigorate war-gaming, Aspect #3: Initiate long-range research and development programs, Aspect #4: Make DOD practices more innovative, and Aspect #5: Advance technology and new operational concepts. Per DII instruction, this paper concentrates on Aspect #2 and Aspect #4 by reinvigorating the war-gaming effort with a focus on an innovative approach for developing the optimum Program and Technical Baselines (PTBs) and their corresponding optimum acquisition strategies for acquiring future space systems. The paper describes a unified approach for applying the war-gaming concept for future DOD acquisition of space systems. The proposed approach includes a Unified Game-based Acquisition Framework (UGAF) and an Advanced Game-Based Mathematical Framework (AGMF) using Bayesian war-gaming engines to optimize PTB solutions and select the corresponding optimum acquisition strategies for acquiring a space system. The framework defines the action space for all players with a complete description of the elements associated with the games, including Department of Defense Acquisition Authority (DAA), stakeholders, warfighters, and potential contractors, War-Gaming Engines (WGEs) played by DAA, WGEs played by Contractor (KTR), and the players' Payoff and Cost functions (PCFs). The AGMF presented here addresses both complete and incomplete information cases. The proposed framework provides a recipe for the DAA and USAF-Space and Missile Systems Center (SMC) to acquire future space systems optimally.

  16. Development and Testing of a Variable Conductance Thermal Acquisition, Transport, and Switching System

    NASA Technical Reports Server (NTRS)

    Bugby, David C.; Farmer, Jeffery T.; Stouffer, Charles J.

    2013-01-01

    This paper describes the development and testing of a scalable thermal management architecture for instruments, subsystems, or systems that must operate in severe space environments with wide variations in sink temperature. The architecture involves a serial linkage of one or more hot-side variable conductance heat pipes (VCHPs) to one or more cold-side loop heat pipes (LHPs). The VCHPs provide wide area heat acquisition, limited distance thermal transport, modest against gravity pumping, concentrated LHP startup heating, and high switching ratio variable conductance operation. The LHPs provide localized heat acquisition, long distance thermal transport, significant against gravity pumping, and high switching ratio variable conductance operation. The single-VCHP, single-LHP system described herein was developed to maintain thermal control of a small robotic lunar lander throughout the lunar day-night thermal cycle. It is also applicable to other variable heat rejection space missions in severe environments. Operationally, despite a 60-70% gas blocked VCHP condenser during ON testing, the system was still able to provide 2-4 W/K ON conductance, 0.01 W/K OFF conductance, and an end-to-end switching ratio of 200-400. The paper provides a detailed analysis of VCHP condenser performance, which quantified the gas blockage situation. Future multi-VCHP/multi-LHP thermal management system concepts that provide power/transport length scalability are also discussed.

  17. 77 FR 5750 - Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... DEPARTMENT OF AGRICULTURE 48 CFR Part 422 RIN 0599-AA19 Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law Violations; Withdrawal AGENCY: Office of Procurement and Property Management, Departmental Management, Department of Agriculture. ACTION: Proposed rule...

  18. 77 FR 5714 - Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... DEPARTMENT OF AGRICULTURE 48 CFR Part 422 RIN 0599-AA19 Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law Violations; Withdrawal AGENCY: Office of Procurement and Property Management, Departmental Management, Department of Agriculture. ACTION: Direct Final...

  19. Mobilization and Defense Management Technical Report Series. Effective Integration of Faculty Requirements into Army System Acquisition Programs.

    DTIC Science & Technology

    1983-05-01

    following general conclusions: a. ’fle AM sytem for the acquisition of new weapons system and equipment as well as restructuring of ognztnsto include the...overallprogram iepmtim MFea - Abm #~ Ifiobd is =OWe bW decision W"Me to met their r~i~ Utia Mar oerall Arsy progrm ememktian 2is con be mwil viOULtud In a...uQeNt efru to inorporate detailed facility mqal..t fatos into every NS element of sytem acquisition, e.g., -u Us, WA, TAP OP. 57 ~ (-. ~.L g. Increase

  20. 48 CFR 51.204 - Use of interagency fleet management system (IFMS) vehicles and related services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor Use of Interagency Fleet Management System (IFMS) 51.204 Use of interagency fleet management system (IFMS) vehicles and related services. Contractors authorized to use interagency fleet management... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Use of interagency fleet...

  1. Python based integration of GEM detector electronics with JET data acquisition system

    NASA Astrophysics Data System (ADS)

    Zabołotny, Wojciech M.; Byszuk, Adrian; Chernyshova, Maryna; Cieszewski, Radosław; Czarski, Tomasz; Dalley, Simon; Hogben, Colin; Jakubowska, Katarzyna L.; Kasprowicz, Grzegorz; Poźniak, Krzysztof; Rzadkiewicz, Jacek; Scholz, Marek; Shumack, Amy

    2014-11-01

    This paper presents the system integrating the dedicated measurement and control electronic systems for Gas Electron Multiplier (GEM) detectors with the Control and Data Acquisition system (CODAS) in the JET facility in Culham, England. The presented system performs the high level procedures necessary to calibrate the GEM detector and to protect it against possible malfunctions or dangerous changes in operating conditions. The system also allows control of the GEM detectors from CODAS, setting of their parameters, checking their state, starting the plasma measurement and to reading the results. The system has been implemented using the Python language, using the advanced libraries for implementation of network communication protocols, for object based hardware management and for data processing.

  2. [Multi-channel motion signal acquisition system and experimental results].

    PubMed

    Zhong, Sheng; Yi, Wanguan; Deng, Ke; Zhan, Kai; Wen, Huiying; Chen, Xin

    2014-09-01

    For the study of muscle function and features during exercise, a multi-channel data acquisition system was developed, the overall design of the system, hardware composition, the function of system and so on have made a detail implements. The synchronous acquisition and storage of the surface EMG signal, joint angle signal, plantar pressure signal, ultrasonic image and initial results have been achieved.

  3. Microprogrammable Integrated Data Acquisition System-Fatigue Life Data Application

    DTIC Science & Technology

    1976-03-01

    Lt. James W. Sturges, successfully applied the Midas general system [Sturges, 1975] to the fatigue life data monitoring problem and proved its...life data problem . The Midas FLD system computer program generates the required signals in the proper sequence for effectively sampling the 8-channel...Integrated Data Acquisition System- Fatigue Life Data Application" ( Midas FLD) is a microprocessor based data acquisition system. It incorporates a Pro-Log

  4. 41 CFR 109-27.5104-1 - Acquisitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 27-INVENTORY MANAGEMENT 27.51-Management of Precious Metals § 109-27.5104-1 Acquisitions. DOE organizations and contractors shall contact the Business Center for Precious Metals Sales and Recovery to determine the...

  5. 41 CFR 109-27.5104-1 - Acquisitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 27-INVENTORY MANAGEMENT 27.51-Management of Precious Metals § 109-27.5104-1 Acquisitions. DOE organizations and contractors shall contact the Business Center for Precious Metals Sales and Recovery to determine the...

  6. Low-cost data acquisition systems for photovoltaic system monitoring and usage statistics

    NASA Astrophysics Data System (ADS)

    Fanourakis, S.; Wang, K.; McCarthy, P.; Jiao, L.

    2017-11-01

    This paper presents the design of a low-cost data acquisition system for monitoring a photovoltaic system’s electrical quantities, battery temperatures, and state of charge of the battery. The electrical quantities are the voltages and currents of the solar panels, the battery, and the system loads. The system uses an Atmega328p microcontroller to acquire data from the photovoltaic system’s charge controller. It also records individual load information using current sensing resistors along with a voltage amplification circuit and an analog to digital converter. The system is used in conjunction with a wall power data acquisition system for the recording of regional power outages. Both data acquisition systems record data in micro SD cards. The data has been successfully acquired from both systems and has been used to monitor the status of the PV system and the local power grid. As more data is gathered it can be used for the maintenance and improvement of the photovoltaic system through analysis of the photovoltaic system’s parameters and usage statistics.

  7. 75 FR 3178 - Defense Federal Acquisition Regulation Supplement; Lead System Integrators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... Government procurement. Amy G. Williams, Editor, Defense Acquisition Regulations System. 0 Accordingly, the..., without change, an interim rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to... limitations on the award of new contracts for lead system integrator functions in the acquisition of major DoD...

  8. Cost and Time Overruns for Major Defense Acquisition Programs: An Annotated Brief

    DTIC Science & Technology

    2011-04-30

    Logistics Management) • Director, Strategic Systems Programs Office • Deputy Director, Acquisition Career Management, US Army • Defense Business...acquisition and industrial base issues and their impact on the transatlantic defense market. Before joining CSIS, he worked as a freelance defense

  9. Training the DoD Software Acquisition Professional

    DTIC Science & Technology

    2015-02-01

    Systems Acquisition (Information Resource Management ( IRM )), IRM101 (Level 1). This is a distance learning course (online course). This course...experience. 3. Advanced Systems Acquisition, IRM304 (Level 3 First Course). This is a classroom graduate-level experience. This course focuses on the IRM ...IT courses. Why IRM and SAM? Years ago, there were separate SAM and IRM courses at each level. However, with the Services request to decrease

  10. 78 FR 37676 - Federal Acquisition Regulation; System for Award Management Name Change, Phase 1 Implementation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ....204-13 System for Award Management Maintenance. * * * * * System for Award Management Maintenance (Jul...; System for Award Management Name Change, Phase 1 Implementation AGENCY: Department of Defense (DoD... System for Award Management (SAM) database. DATES: Effective Date: July 22, 2013. FOR FURTHER INFORMATION...

  11. Multi-Objective Optimization of System Capability Satisficing in Defense Acquisition

    DTIC Science & Technology

    2012-04-30

    sponsored by the USD(AT&L). Second, we issue an annual internal call for proposals to seek NPS faculty research supporting the interests of our...program sponsors. Finally, we serve as a “broker” to market specific research topics identified by our sponsors to NPS graduate students. This three...expanding the technology readiness level within defense acquisition. International Journal of Defense Acquisition Management, 1, 39–58. Tan, W

  12. The Wireless Data Acquisition System for the Vibration Table

    NASA Astrophysics Data System (ADS)

    Teng, Y. T.; Hu, X.

    2014-12-01

    The vibration table is a large-scaled tool used for inspecting the performance of seismometers. The output from a seismometer on the table can be directly monitored when the vibration table moves in certain pattern. Compared with other inspection methods, inspecting seismometers' performance indicators (frequency response, degree of linearity, sensitivity, lateral inhibition and dynamic range etc). using vibration tables is more intuitive. Therefore, the vibration tables are an essential testing part in developing new seismometers and seismometer quality control. Whereas, in practice, a cable is needed to connect the seismometer to the ground equipments for its signal outputs and power supply, that means adding a time-varying nonlinear spring between the vibration table and ground. The cable adds nonlinear feature to the table, distorts the table-board movement and bring extra errors to the inspecting work and affected the testing accuracy and precision. In face of this problem, we developed a wireless acquiring system for the vibration table. The system is consisted of a three-channel analog-to-digital conversion, an acquisition control part, local data storage, network interface, wireless router and power management, etc. The analog-to-digital conversion part uses a 24-digit high-precision converter, which has a programmable amplifier at the front end of its artificial circuit, with the function of matching outputs with different amplifier from the vibration table. The acquisition control part uses a 32 bit ARM processor, with low-power dissipation, minute extension and high performance. The application software platform is written in Linux to make the system convenient for multitasking work. Large volume local digital storage is achieved by a 32G SD card, which is used for saving real time acquired data. Data transmission is achieved by network interface and wireless router, which can simplify the application software by the supported TCP/IP protocol. Besides

  13. 48 CFR 9904.411 - Cost accounting standard-accounting for acquisition costs of material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard-accounting for acquisition costs of material. 9904.411 Section 9904.411 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND...

  14. Defense Acquisition Structures and Capabilities Review

    DTIC Science & Technology

    2007-06-01

    systems to joint portfolio management Refinement of a human capital strategy Improvement of governance of the business transformation effort...Management, Senior- Level Tri-Chaired investment panel for the new Concept Decision process for major programs, and Defense Acquisition Executive Summary...establishment of centers of excellence. DLA reorganized to implement the Business Systems Modernization (BSM) initiative designed to improve end-to-end

  15. System Earned Readiness Management for Defense Acquisition

    DTIC Science & Technology

    2009-01-01

    Product   Innovation   Management  19(3):  233-­‐245.   Brady,  J.  (2001...1987).  "New  Products:  What  Separates  Winners  from  Losers?"  Journal  of   Product   Innovation   Management  4(3...Critical  Success  Factors  in  New  Product   Development."  Journal  of   Product   Innovation   Management

  16. Optoelectronic date acquisition system based on FPGA

    NASA Astrophysics Data System (ADS)

    Li, Xin; Liu, Chunyang; Song, De; Tong, Zhiguo; Liu, Xiangqing

    2015-11-01

    An optoelectronic date acquisition system is designed based on FPGA. FPGA chip that is EP1C3T144C8 of Cyclone devices from Altera corporation is used as the centre of logic control, XTP2046 chip is used as A/D converter, host computer that communicates with the date acquisition system through RS-232 serial communication interface are used as display device and photo resistance is used as photo sensor. We use Verilog HDL to write logic control code about FPGA. It is proved that timing sequence is correct through the simulation of ModelSim. Test results indicate that this system meets the design requirement, has fast response and stable operation by actual hardware circuit test.

  17. 75 FR 65439 - Defense Federal Acquisition Regulation Supplement; Electronic Subcontracting Reporting System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 219 and 252 [DFARS Case... System AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Interim rule... Supplement (DFARS) to conform to the Federal Acquisition Regulation (FAR) by providing Department of Defense...

  18. 77 FR 30361 - Defense Federal Acquisition Regulation Supplement; Defense Trade Cooperation Treaty With the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... DEPARTMENT OF DEFENSE Defense Acquisitions Regulations System 48 CFR Parts 225 and 252 RIN 0750... United Kingdom (DFARS 2012-D034) AGENCY: Defense Acquisition Regulations System; Department of Defense... Acquisition Regulations System, Attn: (Insert case manager's name), OUSD (AT&L) DPAP/DARS, Room 3B855, 3060...

  19. Real-time data acquisition and telemetry based irrigation control system

    DOEpatents

    Slater, John M.; Svoboda, John M.

    2005-12-13

    A data acquisition and telemetry based control system for use in facilitating substantially real time management of an agricultural irrigation system. The soil moisture sensor includes a reader and a plurality of probes. The probes each include an electronic circuit having a moisture sensing capacitor in operative communication with the soil whose moisture is to be measured. Each probe also includes a receive/transmit antenna and the reader includes a transmit/receive antenna, so that as the reader passes near the probe, the reader transmits a digital excitation signal to the electronic circuit of the biodegradable probe via an inductive couple formed between the transmit/receive antenna of the reader and the receive/transmit coil of the probe. The electronic circuit uses an energy component of the excitation signal to generate a digital data signal which indicates the moisture content of the soil adjacent to the moisture sensing capacitor. The probe sends the data signal to the reader which then uses the data signal to develop a corresponding set of watering instructions which are then transmitted to a control module in communication with the irrigation system. The control module sends corresponding control signals to nozzles of the irrigation system causing the irrigation system to disperse water in a manner consistent with the moisture content data transmitted by the probes to the reader. Because the irrigation system moves continuously through the field to be irrigated, the moisture content data acquisition and resultant water dispersal by the irrigation system occur substantially in real time.

  20. Total Quality Management: Will It Work in the System Program Office?

    DTIC Science & Technology

    1990-05-01

    Quality Management (TQM) is a relatively new philosophy of management which has high-level Department of Defense support and is presently being implemented in the Air Force. In the Air Force Systems Command, weapon system development and acquisition are carried out in System Program Offices (SPOs), staffed with various functionally oriented specialists supplied to the System Program Director by functional ’home offices’ via a matrix management scheme. Can TQM, relying as it does on cross-functional cooperation and on processes which cross functional lines, be

  1. Multitasking in a data acquisition system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, J.E.

    1980-01-01

    Microprocessors and microcomputers have been employed widely in data acquisition applications due to low cost and the ease of adapting the microcomputer to changing or altered requirements. Multitasking offers ways of getting more performance from a microcomputer and also a means of designing a system which by its nature is easily changed to meet new requirements. The term multitasking is used to include definitions of multitasking and multiprogramming: multitasking-performing various related functions of the same job, e.g. data acquisition and data logging (recording); multiprogramming-performing possibly unrelated jobs concurrently.

  2. "Data Acquisition Systems"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Unterweger, Michael; Costrell, Louis deceased

    2009-07-07

    This project involved support for Lou Costrell and myself in the development of IEEE and IEC standards for nuclear counting and data acquisition systems. Over the years, as a result of this support, Lou and I were able to attend standards meetings of IEEE and IEC, which led directly to the publication of many standards for NIM systems, FastBus and CAMAC. We also chaired several writing committees as well as ANSI N42 (Nuclear instrumentation), IEEE NIM (NIM standard), IEEE NID (NPSS nuclear instruments and detector) and IEC TC45 WG9 (Nuclear instrumentation). Through this support we were able to assure thatmore » the interests of the US and DOE were expressed and implemented in the various standards.« less

  3. An intelligent data acquisition system for fluid mechanics research

    NASA Technical Reports Server (NTRS)

    Cantwell, E. R.; Zilliac, G.; Fukunishi, Y.

    1989-01-01

    This paper describes a novel data acquisition system for use with wind-tunnel probe-based measurements, which incorporates a degree of specific fluid dynamics knowledge into a simple expert system-like control program. The concept was developed with a rudimentary expert system coupled to a probe positioning mechanism operating in a small-scale research wind tunnel. The software consisted of two basic elements, a general-purpose data acquisition system and the rulebased control element to take and analyze data and supplying decisions as to where to measure, how many data points to take, and when to stop. The system was validated in an experiment involving a vortical flow field, showing that it was possible to increase the resolution of the experiment or, alternatively, reduce the total number of data points required, to achieve parity with the results of most conventional data acquisition approaches.

  4. Report on the Audit ot the Acquisition of the Tacit Rainbow Anti-Radiation Missile System

    DTIC Science & Technology

    1991-06-24

    This is our final report on the audit of the Tacit Rainbow Anti-Radiation Missile System (Tacit Rainbow) for your information and use. We performed... the audit from March through December 1990. The audit objective was to evaluate the acquisition management of the air-launched Tacit Rainbow system to...contains no recommendations because DoD took action to cancel the Tacit Rainbow system in FY 1992. We are bringing the issues identified during the audit to

  5. A flexible computerized system for environmental data acquisition and transmission

    NASA Astrophysics Data System (ADS)

    Zappalà, G.

    2009-04-01

    -based instrumentation. The data acquisition and transmission system is based on IEEE P996.1 standard boards, implementing a PC-like architecture; basically, it consists in a Pentium family CPU (the fist prototypes used a 40 MHz 386 CPU), a variable number of RS-232 ports to connect measuring instruments and communication devices, an analog to digital converter (8 inputs 12 or 16 bit), power outputs with connected circuit status feedback to drive actuators and switch on and off the measuring systems, satellite and/or cellular phone modem, GPS; the mass storage is supplied by Disk on Chip (DOC) devices. According to the needs, it can be fully or only partly implemented. The software environment is Datalight ROMDOS v. 6, an MS-DOS compatible Operating System. The software has been written in Microsoft Professional Compiled BASIC v. 7.1. and Microsoft Macro Assembler v. 5.0. It enables to fully control the system instruments both in local and remote mode using a special set of macro commands (that can be combined into sequences using a simple text editor) that include also conditional execution of branches; this feature can be very useful in case of partial operativity of the system due, for instance, to low battery level or failure of some instrument. Available commands include: • System management commands • Instrument management commands • Conditional branch commands • Data transmission commands Collected data are locally stored and can be transmitted as e-mails, so increasing their safety against loosing and making the global data path fault tolerant using the peculiarities of the e-mail system. The first version was used in a network of coastal monitoring buoys funded by the Italian SAM program; a second one to equip an automatic multiple launcher for expendable probes to be used in ships of opportunity, designed and built in the framework of an EU funded program, "MFSTEP". Every hour, a "sequence manager" starts a macro-command sequence, that can be different for each time

  6. A distributed data acquisition system for aeronautics test facilities

    NASA Technical Reports Server (NTRS)

    Fronek, Dennis L.; Setter, Robert N.; Blumenthal, Philip Z.; Smalley, Robert R.

    1987-01-01

    The NASA Lewis Research Center is in the process of installing a new data acquisition and display system. This new system will provide small and medium sized aeronautics test facilities with a state-of-the-art real-time data acquisition and display system. The new data system will provide for the acquisition of signals from a variety of instrumentation sources. They include analog measurements of temperatures, pressures, and other steady state voltage inputs; frequency inputs to measure speed and flow; discrete I/O for significant events, and modular instrument systems such as multiplexed pressure modules or electronic instrumentation with a IEEE 488 interface. The data system is designed to acquire data, convert it to engineering units, compute test dependent performance calculations, limit check selected channels or calculations, and display the information in alphanumeric or graphical form with a cycle time of one second for the alphanumeric data. This paper describes the system configuration, its salient features, and the expected impact on testing.

  7. NASA Data Acquisition System Software Development for Rocket Propulsion Test Facilities

    NASA Technical Reports Server (NTRS)

    Herbert, Phillip W., Sr.; Elliot, Alex C.; Graves, Andrew R.

    2015-01-01

    Current NASA propulsion test facilities include Stennis Space Center in Mississippi, Marshall Space Flight Center in Alabama, Plum Brook Station in Ohio, and White Sands Test Facility in New Mexico. Within and across these centers, a diverse set of data acquisition systems exist with different hardware and software platforms. The NASA Data Acquisition System (NDAS) is a software suite designed to operate and control many critical aspects of rocket engine testing. The software suite combines real-time data visualization, data recording to a variety formats, short-term and long-term acquisition system calibration capabilities, test stand configuration control, and a variety of data post-processing capabilities. Additionally, data stream conversion functions exist to translate test facility data streams to and from downstream systems, including engine customer systems. The primary design goals for NDAS are flexibility, extensibility, and modularity. Providing a common user interface for a variety of hardware platforms helps drive consistency and error reduction during testing. In addition, with an understanding that test facilities have different requirements and setups, the software is designed to be modular. One engine program may require real-time displays and data recording; others may require more complex data stream conversion, measurement filtering, or test stand configuration management. The NDAS suite allows test facilities to choose which components to use based on their specific needs. The NDAS code is primarily written in LabVIEW, a graphical, data-flow driven language. Although LabVIEW is a general-purpose programming language; large-scale software development in the language is relatively rare compared to more commonly used languages. The NDAS software suite also makes extensive use of a new, advanced development framework called the Actor Framework. The Actor Framework provides a level of code reuse and extensibility that has previously been difficult

  8. Improving Recall Using Database Management Systems: A Learning Strategy.

    ERIC Educational Resources Information Center

    Jonassen, David H.

    1986-01-01

    Describes the use of microcomputer database management systems to facilitate the instructional uses of learning strategies relating to information processing skills, especially recall. Two learning strategies, cross-classification matrixing and node acquisition and integration, are highlighted. (Author/LRW)

  9. Performance of the Defense Acquisition System, 2013 Annual Report

    DTIC Science & Technology

    2013-06-28

    well beyond their start dates, which could indicate factors not attributable to the initial management of the contracts. Figure 2-13. DoD Total ...Attributed to W. Edwards Deming While the United States achieves its national security missions by equipping its military forces with the best weapons...annual reports on the performance of the defense acquisition system—its programs, institutions, workforce, managers , executives, and industrial partners

  10. Content Analysis in Systems Engineering Acquisition Activities

    DTIC Science & Technology

    2016-04-30

    Acquisition Activities Karen Holness, Assistant Professor, NPS Update on the Department of the Navy Systems Engineering Career Competency Model Clifford...systems engineering toolkit . Having a common analysis tool that is easy to use would support the feedback of observed system performance trends from the

  11. 48 CFR 252.251-7001 - Use of Interagency Fleet Management System (IFMS) vehicles and related services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System (IFMS) vehicles and related services. 252.251-7001 Section 252.251-7001 Federal Acquisition... Fleet Management System (IFMS) vehicles and related services. As prescribed in 251.205, use the following clause: Use of Interagency Fleet Management System (IFMS) Vehicles and Related Services (DEC 1991...

  12. 48 CFR 252.251-7001 - Use of Interagency Fleet Management System (IFMS) vehicles and related services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Management System (IFMS) vehicles and related services. 252.251-7001 Section 252.251-7001 Federal Acquisition... Fleet Management System (IFMS) vehicles and related services. As prescribed in 251.205, use the following clause: Use of Interagency Fleet Management System (IFMS) Vehicles and Related Services (DEC 1991...

  13. An Overview of Advanced Data Acquisition System (ADAS)

    NASA Technical Reports Server (NTRS)

    Mata, Carlos T.; Steinrock, T. (Technical Monitor)

    2001-01-01

    The paper discusses the following: 1. Historical background. 2. What is ADAS? 3. R and D status. 4. Reliability/cost examples (1, 2, and 3). 5. What's new? 6. Technical advantages. 7. NASA relevance. 8. NASA plans/options. 9. Remaining R and D. 10. Applications. 11. Product benefits. 11. Commercial advantages. 12. intellectual property. Aerospace industry requires highly reliable data acquisition systems. Traditional Acquisition systems employ end-to-end hardware and software redundancy. Typically, redundancy adds weight, cost, power consumption, and complexity.

  14. Implementation of High Speed Distributed Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Raju, Anju P.; Sekhar, Ambika

    2012-09-01

    This paper introduces a high speed distributed data acquisition system based on a field programmable gate array (FPGA). The aim is to develop a "distributed" data acquisition interface. The development of instruments such as personal computers and engineering workstations based on "standard" platforms is the motivation behind this effort. Using standard platforms as the controlling unit allows independence in hardware from a particular vendor and hardware platform. The distributed approach also has advantages from a functional point of view: acquisition resources become available to multiple instruments; the acquisition front-end can be physically remote from the rest of the instrument. High speed data acquisition system transmits data faster to a remote computer system through Ethernet interface. The data is acquired through 16 analog input channels. The input data commands are multiplexed and digitized and then the data is stored in 1K buffer for each input channel. The main control unit in this design is the 16 bit processor implemented in the FPGA. This 16 bit processor is used to set up and initialize the data source and the Ethernet controller, as well as control the flow of data from the memory element to the NIC. Using this processor we can initialize and control the different configuration registers in the Ethernet controller in a easy manner. Then these data packets are sending to the remote PC through the Ethernet interface. The main advantages of the using FPGA as standard platform are its flexibility, low power consumption, short design duration, fast time to market, programmability and high density. The main advantages of using Ethernet controller AX88796 over others are its non PCI interface, the presence of embedded SRAM where transmit and reception buffers are located and high-performance SRAM-like interface. The paper introduces the implementation of the distributed data acquisition using FPGA by VHDL. The main advantages of this system are high

  15. 48 CFR 52.234-2 - Notice of Earned Value Management System-Pre-Award IBR.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Management System-Pre-Award IBR. 52.234-2 Section 52.234-2 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.234-2 Notice of Earned Value Management System—Pre-Award IBR. As prescribed in 34.203(a) use the following provision: Notice of Earned Value Management System—Pre-Award IBR (JUL 2006...

  16. 48 CFR 52.234-2 - Notice of Earned Value Management System-Pre-Award IBR.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management System-Pre-Award IBR. 52.234-2 Section 52.234-2 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.234-2 Notice of Earned Value Management System—Pre-Award IBR. As prescribed in 34.203(a) use the following provision: Notice of Earned Value Management System—Pre-Award IBR (JUL 2006...

  17. 48 CFR 52.234-2 - Notice of Earned Value Management System-Pre-Award IBR.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Management System-Pre-Award IBR. 52.234-2 Section 52.234-2 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.234-2 Notice of Earned Value Management System—Pre-Award IBR. As prescribed in 34.203(a) use the following provision: Notice of Earned Value Management System—Pre-Award IBR (JUL 2006...

  18. 48 CFR 52.234-2 - Notice of Earned Value Management System-Pre-Award IBR.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Management System-Pre-Award IBR. 52.234-2 Section 52.234-2 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.234-2 Notice of Earned Value Management System—Pre-Award IBR. As prescribed in 34.203(a) use the following provision: Notice of Earned Value Management System—Pre-Award IBR (JUL 2006...

  19. 48 CFR 52.234-2 - Notice of Earned Value Management System-Pre-Award IBR.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System-Pre-Award IBR. 52.234-2 Section 52.234-2 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.234-2 Notice of Earned Value Management System—Pre-Award IBR. As prescribed in 34.203(a) use the following provision: Notice of Earned Value Management System—Pre-Award IBR (JUL 2006...

  20. Effective Transition Management: The Seamless System

    NASA Technical Reports Server (NTRS)

    Burke, Marty

    1995-01-01

    In this age of shrinking resources, cost avoidance has become as critical as direct cost savings. There is no doubt that Effective Transition Management (ETM) achieves this aim. What then, is ETM and how does it achieve its goal? It is the introduction and use of a hierarchical decision model and computerized tracking system which successfully integrates capital acquisition into the support base. You will discover that because this proven system is generic, compatible and flexible, its applications are virtually unlimited. It is this highly dynamic process which I would like to share with you. Skilled specialists are now rotated rapidly through acquisition programs on a requirements-driven basis. Managers continue their quest for inefficient areas to trim, slash or cut. However, there is one area of operations in every major corporation and government department that, as yet, has not received the attention it deserves. This essential element is Transition Management. Capital acquisitions, at some point, must be handed off to a support matrix for the 'in-service' phase of their life cycle. Most of us who have been on the receiving end can usually cite outrageous examples of adjustment, recovery or disaster. This means buying what amounts to a second initial sparing package, re-aligning the range and depth of inventory to match a changed maintenance concept, interpreting contractor-developed configuration control data or ensuring that the latest information is contained in the technical publications. This list is endless. For major purchases, this 'in-service' phase is often fifteen, twenty or more years. The least desirable, yet most common condition, is to suffer up to five years of recovering from errors or omissions after the transition to the support matrix occurs. Without ETM, making new equipment fully operational may thus become a long and costly process.

  1. Data acquisition system

    DOEpatents

    Phillips, David T.

    1979-01-01

    A data acquisition system capable of resolving transient pulses in the subnanosecond range. A pulse in an information carrying medium such as light is transmitted through means which disperse the pulse, such as a fiber optic light guide which time-stretches optical pulses by chromatic dispersion. This time-stretched pulse is used as a sampling pulse and is modulated by the signal to be recorded. The modulated pulse may be further time-stretched prior to being recorded. The recorded modulated pulse is unfolded to derive the transient signal by utilizing the relationship of the time-stretching that occurred in the original pulse.

  2. Enhanced Data-Acquisition System

    NASA Technical Reports Server (NTRS)

    Mustain, Roy W.

    1990-01-01

    Time-consuming, costly digitization of analog signals on magnetic tape eliminated. Proposed data-acquisition system provides nearly immediate access to data in incoming signals by digitizing and recording them both on magnetic tape and on optical disk. Tape and/or disk later played back to reconstruct signals in analog or digital form for analysis. Of interest in industrial and scientific applications in which necessary to digitize, store, and/or process large quantities of experimental data.

  3. Improvements and modifications to the NASA microwave signature acquisition system

    NASA Technical Reports Server (NTRS)

    Jean, B. R.; Newton, R. W.; Warren, G. L.; Clark, B. V.; Zajicek, J. L.

    1978-01-01

    A user oriented description of the modified and upgraded Microwave Signature Acquisition System is provided. The present configuration of the sensor system and its operating characteristics are documented and a step-by-step operating procedure provides instruction for mounting the antenna truss assembly, readying the system for data acquisition, and for controlling the system during the data collection sequence. The resulting data products are also identified.

  4. Knowledge-Acquisition Tool For Expert System

    NASA Technical Reports Server (NTRS)

    Disbrow, James D.; Duke, Eugene L.; Regenie, Victoria A.

    1988-01-01

    Digital flight-control systems monitored by computer program that evaluates and recommends. Flight-systems engineers for advanced, high-performance aircraft use knowlege-acquisition tool for expert-system flight-status monitor suppling interpretative data. Interpretative function especially important in time-critical, high-stress situations because it facilitates problem identification and corrective strategy. Conditions evaluated and recommendations made by ground-based engineers having essential knowledge for analysis and monitoring of performances of advanced aircraft systems.

  5. Coast guard : as deepwater systems integrator, coast guard Is reassessing costs and capabilities but lags in applying its disciplined acquisition approach.

    DOT National Transportation Integrated Search

    2009-07-01

    The Deepwater Program includes efforts to build or modernize ships and aircraft and to procure other capabilities. In 2002, the Coast Guard contracted with Integrated Coast Guard Systems (ICGS) to manage the acquisition as systems integrator. After a...

  6. 48 CFR 352.234-2 - Notice of earned value management system-post-award Integrated Baseline Review.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Notice of earned value management system-post-award Integrated Baseline Review. 352.234-2 Section 352.234-2 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses 352.234...

  7. 48 CFR 352.234-1 - Notice of earned value management system-pre-award Integrated Baseline Review.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Notice of earned value management system-pre-award Integrated Baseline Review. 352.234-1 Section 352.234-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses 352.234-...

  8. 78 FR 28756 - Defense Federal Acquisition Regulation Supplement: System for Award Management Name Changes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Excluded Parties Listing System (EPLS) databases into the System for Award Management (SAM) database. DATES... combined the functional capabilities of the CCR, ORCA, and EPLS procurement systems into the SAM database... identification number and the type of organization from the System for Award Management database. 0 3. Revise the...

  9. Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules

    DTIC Science & Technology

    2015-06-01

    additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of

  10. New Software Architecture Options for the TCL Data Acquisition System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Valenton, Emmanuel

    2014-09-01

    The Turbulent Combustion Laboratory (TCL) conducts research on combustion in turbulent flow environments. To conduct this research, the TCL utilizes several pulse lasers, a traversable wind tunnel, flow controllers, scientific grade CCD cameras, and numerous other components. Responsible for managing these different data-acquiring instruments and data processing components is the Data Acquisition (DAQ) software. However, the current system is constrained to running through VXI hardware—an instrument-computer interface—that is several years old, requiring the use of an outdated version of the visual programming language, LabVIEW. A new Acquisition System is being programmed which will borrow heavily from either a programming modelmore » known as the Current Value Table (CVT) System or another model known as the Server-Client System. The CVT System model is in essence, a giant spread sheet from which data or commands may be retrieved or written to, and the Server-Client System is based on network connections between a server and a client, very much like the Server-Client model of the Internet. Currently, the bare elements of a CVT DAQ Software have been implemented, consisting of client programs in addition to a server program that the CVT will run on. This system is being rigorously tested to evaluate the merits of pursuing the CVT System model and to uncover any potential flaws which may result in further implementation. If the CVT System is chosen, which is likely, then future work will consist of build up the system until enough client programs have been created to run the individual components of the lab. The advantages of such a System will be flexibility, portability, and polymorphism. Additionally, the new DAQ software will allow the Lab to replace the VXI with a newer instrument interface—the PXI—and take advantage of the capabilities of current and future versions of LabVIEW.« less

  11. 76 FR 74755 - Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... DEPARTMENT OF AGRICULTURE 48 CFR Part 422 RIN 0599-AA19 Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law Violations AGENCY: Office of Procurement and Property Management, Department of Agriculture. ACTION: Proposed rule. SUMMARY: The Office of Procurement...

  12. 76 FR 74722 - Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... DEPARTMENT OF AGRICULTURE 48 CFR Part 422 RIN 0599-AA19 Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law Violations AGENCY: Office of Procurement and Property Management, Department of Agriculture. ACTION: Direct final rule. SUMMARY: The Office of...

  13. 77 FR 38884 - Sisseton Milbank Railroad Company-Acquisition and Operation Exemption-SLA Property Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35641] Sisseton Milbank Railroad Company--Acquisition and Operation Exemption--SLA Property Management Limited Partnership and... verified notice of exemption under 49 CFR 1150.31 to acquire from SLA Property Management Limited...

  14. 41 CFR 109-26.501-53 - Acquisitions by transfer.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Acquisitions by transfer. 109-26.501-53 Section 109-26.501-53 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND...

  15. 41 CFR 102-73.265 - What actions must Federal agencies take to facilitate land acquisition?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 73-REAL ESTATE ACQUISITION Acquisition by Purchase or Condemnation Land § 102-73.265..., Federal agencies must, among other things— (a) Appraise the real property before starting negotiations and...

  16. The Acquisition and Management of Electronic Resources: Can Use Justify Cost?

    ERIC Educational Resources Information Center

    Koehn, Shona L.; Hawamdeh, Suliman

    2010-01-01

    As library collections increasingly become digital, libraries are faced with many challenges regarding the acquisition and management of electronic resources. Some of these challenges include copyright and fair use, the first-sale doctrine, licensing versus ownership, digital preservation, long-term archiving, and, most important, the issue of…

  17. Non-contact finger vein acquisition system using NIR laser

    NASA Astrophysics Data System (ADS)

    Kim, Jiman; Kong, Hyoun-Joong; Park, Sangyun; Noh, SeungWoo; Lee, Seung-Rae; Kim, Taejeong; Kim, Hee Chan

    2009-02-01

    Authentication using finger vein pattern has substantial advantage than other biometrics. Because human vein patterns are hidden inside the skin and tissue, it is hard to forge vein structure. But conventional system using NIR LED array has two drawbacks. First, direct contact with LED array raise sanitary problem. Second, because of discreteness of LEDs, non-uniform illumination exists. We propose non-contact finger vein acquisition system using NIR laser and Laser line generator lens. Laser line generator lens makes evenly distributed line laser from focused laser light. Line laser is aimed on the finger longitudinally. NIR camera was used for image acquisition. 200 index finger vein images from 20 candidates are collected. Same finger vein pattern extraction algorithm was used to evaluate two sets of images. Acquired images from proposed non-contact system do not show any non-uniform illumination in contrary with conventional system. Also results of matching are comparable to conventional system. We developed Non-contact finger vein acquisition system. It can prevent potential cross contamination of skin diseases. Also the system can produce uniformly illuminated images unlike conventional system. With the benefit of non-contact, proposed system shows almost equivalent performance compared with conventional system.

  18. Sustaining Equipment and the Rapid Acquisition Process: The Forgotten Phase

    DTIC Science & Technology

    2012-02-24

    Operation of the Defense Acquisition System,” December 8, 2008. 7 Rasch , Robert. A, Jr. Lessons Learned from Rapid Acquisition: Better, Faster, Cheaper...Life Cycle Management Responsibilities,” Defense AR Journal, 17.2 (April 2010): 183. 37 Robert A. Rasch , Lessons Learned from Rapid Acquisition: Better...Accountability Office (GAO) Report, Subject: Rapid Acquisition of Mine Resistant Protected Vehicles, July 15, 2008, 4. 39 Ibid. 40 Ibid. 41 Robert A. Rasch

  19. Integrated delivery systems: mergers and acquisitions.

    PubMed

    Pinkerton, S

    1999-01-01

    Mergers and acquisitions are usually the way an IDS is built. The CNO and/or CNOs/DONs have an integral role in the resolution of the M/A process. During this time of significant change, during which there may even be chaos, the CNOs work to maintain stability so there is as little impact as possible on patient outcomes, a core responsibility of the CNOs. The CNOs should focus on identifying and working with the highly skilled individuals in the organization to get to the recovery stage of the M/A process, at which time a high-performing organization is achieved. To build this new organization or IDS, the old organizations of the M/A must be changed (Moss Kanter, 1994). The successful CNOs will manage the trade-offs and will become experts in collaboration. The CNO's goals are to maximize the quality of patient care, the professional satisfaction of the nurse, and the goals of achieving cost effectiveness for the system (Clifford, 1998), and keeping this focus through the M/A process will yield success.

  20. Space-Air Co-Observation in Watershed Management: the Establishment of System

    NASA Astrophysics Data System (ADS)

    Zhong, L.; Yu, J.; Tang, X.; Pan, S.

    2018-05-01

    To realize real-time, detailed, and standardized watershed monitoring and management, a dynamic monitoring system is proposed, at all levels (space, air, and ground), by comprehensively utilizing advanced satellite and low-altitude unmanned aerial vehicle (UAV) technologies The system can be used to monitor and manage all kinds of sensitive water targets. This study takes water administration enforcement as an example for proving it feasibility by selecting typical study areas. This study shows that the proposed system is a promising information acquisition means, contributing to the development of watershed management.

  1. Knowledge-based system for flight information management. Thesis

    NASA Technical Reports Server (NTRS)

    Ricks, Wendell R.

    1990-01-01

    The use of knowledge-based system (KBS) architectures to manage information on the primary flight display (PFD) of commercial aircraft is described. The PFD information management strategy used tailored the information on the PFD to the tasks the pilot performed. The KBS design and implementation of the task-tailored PFD information management application is described. The knowledge acquisition and subsequent system design of a flight-phase-detection KBS is also described. The flight-phase output of this KBS was used as input to the task-tailored PFD information management KBS. The implementation and integration of this KBS with existing aircraft systems and the other KBS is described. The flight tests are examined of both KBS's, collectively called the Task-Tailored Flight Information Manager (TTFIM), which verified their implementation and integration, and validated the software engineering advantages of the KBS approach in an operational environment.

  2. Effect of vibration on retention characteristics of screen acquisition systems. [for surface tension propellant acquisition

    NASA Technical Reports Server (NTRS)

    Tegart, J. R.; Aydelott, J. C.

    1978-01-01

    The design of surface tension propellant acquisition systems using fine-mesh screen must take into account all factors that influence the liquid pressure differentials within the system. One of those factors is spacecraft vibration. Analytical models to predict the effects of vibration have been developed. A test program to verify the analytical models and to allow a comparative evaluation of the parameters influencing the response to vibration was performed. Screen specimens were tested under conditions simulating the operation of an acquisition system, considering the effects of such parameters as screen orientation and configuration, screen support method, screen mesh, liquid flow and liquid properties. An analytical model, based on empirical coefficients, was most successful in predicting the effects of vibration.

  3. Automated Traffic Management System and Method

    NASA Technical Reports Server (NTRS)

    Glass, Brian J. (Inventor); Spirkovska, Liljana (Inventor); McDermott, William J. (Inventor); Reisman, Ronald J. (Inventor); Gibson, James (Inventor); Iverson, David L. (Inventor)

    2000-01-01

    A data management system and method that enables acquisition, integration, and management of real-time data generated at different rates, by multiple heterogeneous incompatible data sources. The system achieves this functionality by using an expert system to fuse data from a variety of airline, airport operations, ramp control, and air traffic control tower sources, to establish and update reference data values for every aircraft surface operation. The system may be configured as a real-time airport surface traffic management system (TMS) that electronically interconnects air traffic control, airline data, and airport operations data to facilitate information sharing and improve taxi queuing. In the TMS operational mode, empirical data shows substantial benefits in ramp operations for airlines, reducing departure taxi times by about one minute per aircraft in operational use, translating as $12 to $15 million per year savings to airlines at the Atlanta, Georgia airport. The data management system and method may also be used for scheduling the movement of multiple vehicles in other applications, such as marine vessels in harbors and ports, trucks or railroad cars in ports or shipping yards, and railroad cars in switching yards. Finally, the data management system and method may be used for managing containers at a shipping dock, stock on a factory floor or in a warehouse, or as a training tool for improving situational awareness of FAA tower controllers, ramp and airport operators, or commercial airline personnel in airfield surface operations.

  4. Reconfigurable Embedded System for Electrocardiogram Acquisition.

    PubMed

    Kay, Marcel Seiji; Iaione, Fábio

    2015-01-01

    Smartphones include features that offers the chance to develop mobile systems in medical field, resulting in an area called mobile-health. One of the most common medical examinations is the electrocardiogram (ECG), which allows the diagnosis of various heart diseases, leading to preventative measures and preventing more serious problems. The objective of this study was to develop a wireless reconfigurable embedded system using a FPAA (Field Programmable Analog Array), for the acquisition of ECG signals, and an application showing and storing these signals on Android smartphones. The application also performs the partial FPAA reconfiguration in real time (adjustable gain). Previous studies using FPAA usually use the development boards provided by the manufacturer (high cost), do not allow the reconfiguration in real time, use no smartphone and communicate via cables. The parameters tested in the acquisition circuit and the quality of ECGs registered in an individual were satisfactory.

  5. The data acquisition system for the ANTARES neutrino telescope

    NASA Astrophysics Data System (ADS)

    Aguilar, J. A.; Albert, A.; Ameli, F.; Anghinolfi, M.; Anton, G.; Anvar, S.; Aslanides, E.; Aubert, J.-J.; Barbarito, E.; Basa, S.; Battaglieri, M.; Becherini, Y.; Bellotti, R.; Beltramelli, J.; Bertin, V.; Bigi, A.; Billault, M.; Blaes, R.; de Botton, N.; Bouwhuis, M. C.; Bradbury, S. M.; Bruijn, R.; Brunner, J.; Burgio, G. F.; Busto, J.; Cafagna, F.; Caillat, L.; Calzas, A.; Capone, A.; Caponetto, L.; Carmona, E.; Carr, J.; Cartwright, S. L.; Castel, D.; Castorina, E.; Cavasinni, V.; Cecchini, S.; Ceres, A.; Charvis, P.; Chauchot, P.; Chiarusi, T.; Circella, M.; Colnard, C.; Compère, C.; Coniglione, R.; Cottini, N.; Coyle, P.; Cuneo, S.; Cussatlegras, A.-S.; Damy, G.; van Dantzig, R.; de Marzo, C.; Dekeyser, I.; Delagnes, E.; Denans, D.; Deschamps, A.; Dessages-Ardellier, F.; Destelle, J.-J.; Dinkespieler, B.; Distefano, C.; Donzaud, C.; Drogou, J.-F.; Druillole, F.; Durand, D.; Ernenwein, J.-P.; Escoffier, S.; Falchini, E.; Favard, S.; Feinstein, F.; Ferry, S.; Festy, D.; Fiorello, C.; Flaminio, V.; Galeotti, S.; Gallone, J.-M.; Giacomelli, G.; Girard, N.; Gojak, C.; Goret, Ph.; Graf, K.; Hallewell, G.; Harakeh, M. N.; Hartmann, B.; Heijboer, A.; Heine, E.; Hello, Y.; Hernández-Rey, J. J.; Hößl, J.; Hoffman, C.; Hogenbirk, J.; Hubbard, J. R.; Jaquet, M.; Jaspers, M.; de Jong, M.; Jouvenot, F.; Kalantar-Nayestanaki, N.; Kappes, A.; Karg, T.; Karkar, S.; Katz, U.; Keller, P.; Kok, H.; Kooijman, P.; Kopper, C.; Korolkova, E. V.; Kouchner, A.; Kretschmer, W.; Kruijer, A.; Kuch, S.; Kudryavstev, V. A.; Lachartre, D.; Lafoux, H.; Lagier, P.; Lahmann, R.; Lamanna, G.; Lamare, P.; Languillat, J. C.; Laschinsky, H.; Le Guen, Y.; Le Provost, H.; Le van Suu, A.; Legou, T.; Lim, G.; Lo Nigro, L.; Lo Presti, D.; Loehner, H.; Loucatos, S.; Louis, F.; Lucarelli, F.; Lyashuk, V.; Marcelin, M.; Margiotta, A.; Masullo, R.; Mazéas, F.; Mazure, A.; McMillan, J. E.; Megna, R.; Melissas, M.; Migneco, E.; Milovanovic, A.; Mongelli, M.; Montaruli, T.; Morganti, M.; Moscoso, L.; Musumeci, M.; Naumann, C.; Naumann-Godo, M.; Niess, V.; Olivetto, C.; Ostasch, R.; Palanque-Delabrouille, N.; Payre, P.; Peek, H.; Petta, C.; Piattelli, P.; Pineau, J.-P.; Poinsignon, J.; Popa, V.; Pradier, T.; Racca, C.; Randazzo, N.; van Randwijk, J.; Real, D.; van Rens, B.; Réthoré, F.; Rewiersma, P.; Riccobene, G.; Rigaud, V.; Ripani, M.; Roca, V.; Roda, C.; Rolin, J. F.; Romita, M.; Rose, H. J.; Rostovtsev, A.; Roux, J.; Ruppi, M.; Russo, G. V.; Salesa, F.; Salomon, K.; Sapienza, P.; Schmitt, F.; Schuller, J.-P.; Shanidze, R.; Sokalski, I.; Spona, T.; Spurio, M.; van der Steenhoven, G.; Stolarczyk, T.; Streeb, K.; Stubert, D.; Sulak, L.; Taiuti, M.; Tamburini, C.; Tao, C.; Terreni, G.; Thompson, L. F.; Valdy, P.; Valente, V.; Vallage, B.; Venekamp, G.; Verlaat, B.; Vernin, P.; de Vita, R.; de Vries, G.; van Wijk, R.; de Witt Huberts, P.; Wobbe, G.; de Wolf, E.; Yao, A.-F.; Zaborov, D.; Zaccone, H.; Zornoza, J. D.; Zúñiga, J.

    2007-01-01

    The ANTARES neutrino telescope is being constructed in the Mediterranean Sea. It consists of a large three-dimensional array of photo-multiplier tubes. The data acquisition system of the detector takes care of the digitisation of the photo-multiplier tube signals, data transport, data filtering, and data storage. The detector is operated using a control program interfaced with all elements. The design and the implementation of the data acquisition system are described.

  6. Wireless battery management control and monitoring system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zumstein, James M.; Chang, John T.; Farmer, Joseph C.

    A battery management system using a sensor inside of the battery that sensor enables monitoring and detection of various events in the battery and transmission of a signal from the sensor through the battery casing to a control and data acquisition module by wireless transmission. The detection of threshold events in the battery enables remedial action to be taken to avoid catastrophic events.

  7. The Effects of Incentives in Acquisition Competition on Program Outcomes

    DTIC Science & Technology

    2012-06-01

    organizational, management, and cultural issues (Madachy, EFFECTS OF INCENTIVES IN ACQUISITION COMPETITION 5 2008, Frangos , 1998). In the SEI’s direct...change from the task force on defense acquisition law and oversight Forrester, J. W. (1971). Principles of systems. Pegasus Communications. Frangos , S

  8. Hybrid Ion-Detector/Data-Acquisition System for a TOF-MS

    NASA Technical Reports Server (NTRS)

    Burton, William D., Jr.; Schultz, J. Albert; Vaughn, Valentine; McCully, Michael; Ulrich, Steven; Egan, Thomas F.

    2006-01-01

    A modified ion-detector/data-acquisition system has been devised to increase the dynamic range of a time-of-flight mass spectrometer (TOF-MS) that, previously, included a microchannel-plate detector and a data-acquisition system based on counting pulses and time-tagging them by use of a time-to-digital converter (TDC). The dynamic range of the TOF-MS was limited by saturation of the microchannel plate detector, which can handle no more than a few million counts per second. The modified system includes (1) a combined microchannel plate/discrete ion multiplier and (2) a hybrid data-acquisition system that simultaneously performs analog current or voltage measurements and multianode single-ion-pulse-counting time-of-flight measurements to extend the dynamic range of a TDC into the regime in which a mass peak comprises multiple ions arriving simultaneously at the detector. The multianode data are used to determine, in real time, whether the detector is saturated. When saturation is detected, the data-acquisition system selectively enables circuitry that simultaneously determines the ion-peak intensity by measuring the time profile of the analog current or voltage detector-output signal.

  9. Goddard Space Flight Center's Structural Dynamics Data Acquisition System

    NASA Technical Reports Server (NTRS)

    McLeod, Christopher

    2004-01-01

    Turnkey Commercial Off The Shelf (COTS) data acquisition systems typically perform well and meet most of the objectives of the manufacturer. The problem is that they seldom meet most of the objectives of the end user. The analysis software, if any, is unlikely to be tailored to the end users specific application; and there is seldom the chance of incorporating preferred algorithms to solve unique problems. Purchasing a customized system allows the end user to get a system tailored to the actual application, but the cost can be prohibitive. Once the system has been accepted, future changes come with a cost and response time that's often not workable. When it came time to replace the primary digital data acquisition system used in the Goddard Space Flight Center's Structural Dynamics Test Section, the decision was made to use a combination of COTS hardware and in-house developed software. The COTS hardware used is the DataMAX II Instrumentation Recorder built by R.C. Electronics Inc. and a desktop Pentium 4 computer system. The in-house software was developed using MATLAB from The MathWorks. This paper will describe the design and development of the new data acquisition and analysis system.

  10. Goddard Space Flight Center's Structural Dynamics Data Acquisition System

    NASA Technical Reports Server (NTRS)

    McLeod, Christopher

    2004-01-01

    Turnkey Commercial Off The Shelf (COTS) data acquisition systems typically perform well and meet most of the objectives of the manufacturer. The problem is that they seldom meet most of the objectives of the end user. The analysis software, if any, is unlikely to be tailored to the end users specific application; and there is seldom the chance of incorporating preferred algorithms to solve unique problems. Purchasing a customized system allows the end user to get a system tailored to the actual application, but the cost can be prohibitive. Once the system has been accepted, future changes come with a cost and response time that's often not workable. When it came time to replace the primary digital data acquisition system used in the Goddard Space Flight Center's Structural Dynamics Test Section, the decision was made to use a combination of COTS hardware and in-house developed software. The COTS hardware used is the DataMAX II Instrumentation Recorder built by R.C. Electronics Inc. and a desktop Pentium 4 computer system. The in-house software was developed using MATLAF3 from The Mathworks. This paper will describe the design and development of the new data acquisition and analysis system.

  11. 75 FR 32635 - Defense Acquisition Regulations System; Defense Federal Acquisition Regulation Supplement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... Regulations System; Defense Federal Acquisition Regulation Supplement; Balance of Payments Program Exemption... implement the exemption from the Balance of Payments Program for construction material that is commercial... is proposing to amend the DFARS to implement in the clauses at 252.225-7044, Balance of Payments...

  12. Data Acquisition System Architecture and Capabilities At NASA GRC Plum Brook Station's Space Environment Test Facilities

    NASA Technical Reports Server (NTRS)

    Evans, Richard K.; Hill, Gerald M.

    2012-01-01

    Very large space environment test facilities present unique engineering challenges in the design of facility data systems. Data systems of this scale must be versatile enough to meet the wide range of data acquisition and measurement requirements from a diverse set of customers and test programs, but also must minimize design changes to maintain reliability and serviceability. This paper presents an overview of the common architecture and capabilities of the facility data acquisition systems available at two of the world?s largest space environment test facilities located at the NASA Glenn Research Center?s Plum Brook Station in Sandusky, Ohio; namely, the Space Propulsion Research Facility (commonly known as the B-2 facility) and the Space Power Facility (SPF). The common architecture of the data systems is presented along with details on system scalability and efficient measurement systems analysis and verification. The architecture highlights a modular design, which utilizes fully-remotely managed components, enabling the data systems to be highly configurable and support multiple test locations with a wide-range of measurement types and very large system channel counts.

  13. Data Acquisition System Architecture and Capabilities at NASA GRC Plum Brook Station's Space Environment Test Facilities

    NASA Technical Reports Server (NTRS)

    Evans, Richard K.; Hill, Gerald M.

    2014-01-01

    Very large space environment test facilities present unique engineering challenges in the design of facility data systems. Data systems of this scale must be versatile enough to meet the wide range of data acquisition and measurement requirements from a diverse set of customers and test programs, but also must minimize design changes to maintain reliability and serviceability. This paper presents an overview of the common architecture and capabilities of the facility data acquisition systems available at two of the world's largest space environment test facilities located at the NASA Glenn Research Center's Plum Brook Station in Sandusky, Ohio; namely, the Space Propulsion Research Facility (commonly known as the B-2 facility) and the Space Power Facility (SPF). The common architecture of the data systems is presented along with details on system scalability and efficient measurement systems analysis and verification. The architecture highlights a modular design, which utilizes fully-remotely managed components, enabling the data systems to be highly configurable and support multiple test locations with a wide-range of measurement types and very large system channel counts.

  14. Major New Issues Currently Affecting Government Acquisition.

    DTIC Science & Technology

    1987-06-01

    Acquisition Regulation (FAR) and the Competition in Contracting Act (CICA) of 1984, Thybony, Inc., 1985. 5. Brechtel, Donald L., Brost , Edward J. and...of Government Contracts, The George Washington Univer- sity, 1986. 3. White, Kevin L., Issues in Navy Management of Major Weapon Systems Warranties...L. Thesis, The National Law Center of George Washington University, Washington, D.C.. February 1982. 2. Federal Acquisition Regulation (FAR), 1984

  15. Acquisition streamlining: A cultural change

    NASA Technical Reports Server (NTRS)

    Stewart, Jesse

    1992-01-01

    The topics are presented in viewgraph form and include the following: the defense systems management college, educational philosophy, the defense acquisition environment, streamlining initiatives, organizational streamlining types, defense law review, law review purpose, law review objectives, the Public Law Pilot Program, and cultural change.

  16. E-Books in Academic Libraries: Challenges for Acquisition and Collection Management

    ERIC Educational Resources Information Center

    Walters, William H.

    2013-01-01

    This bibliographic essay examines the difficulties associated with the selection, licensing, acquisition, and management of e-books in academic libraries. The potential advantages of e-book technology are likely to be realized only to the extent that they advance the economic goals of e-book suppliers and are consistent with the legal framework…

  17. The Data Acquisition System of the Stockholm Educational Air Shower Array

    NASA Astrophysics Data System (ADS)

    Hofverberg, P.; Johansson, H.; Pearce, M.; Rydstrom, S.; Wikstrom, C.

    2005-12-01

    The Stockholm Educational Air Shower Array (SEASA) project is deploying an array of plastic scintillator detector stations on school roofs in the Stockholm area. Signals from GPS satellites are used to time synchronise signals from the widely separated detector stations, allowing cosmic ray air showers to be identified and studied. A low-cost and highly scalable data acquisition system has been produced using embedded Linux processors which communicate station data to a central server running a MySQL database. Air shower data can be visualised in real-time using a Java-applet client. It is also possible to query the database and manage detector stations from the client. In this paper, the design and performance of the system are described

  18. Department of Homeland Security: Assessments of Selected Complex Acquisitions

    DTIC Science & Technology

    2010-06-01

    10 The two nonmajor programs selected—the Biosurveillance Common...Management Directive AD 102-01, and approves acquisitions to proceed to their next acquisition life- cycle phases upon satisfaction of applicable ...programs are Biosurveillance Common Operating Network and the Integrated Public Alert and Warning System. BioWatch Generation-3 had not started

  19. Management practices and performance of mergers and acquisitions in Pakistan: mediating role of psychological contract.

    PubMed

    Bari, Muhammad Waseem; Fanchen, Meng; Baloch, Muhammad Awais

    2016-01-01

    The objective of this study is to examine the direct and indirect effect of management practices (procedural justice, coordination approach, communication system, integration strategy, and coping programs) on merger and acquisition (M&A) performance in the Pakistan banking industry. Psychological contract (PC) acts as a mediator between Management practices and M&A performance. The Present study distributes a structured questionnaire to 700 bank employees of different management cadres. The useful response rate is 76 % (536 employees). It uses PLS-SEM technique for data analysis. (1) procedural justice is a key strategy which has highly significant direct and indirect effect on M&A performance; however integration strategy and the communication system have an only direct effect. (2) PC performs partial mediation at different levels between management practices and M&A financial and non-financial performance. This study provides an effective solution to solve the soft issues during and post-M&A process. This is one of the few studies which effectively integrate the five constructs into a single framework to study their effects on M&A performance. Limitations and future research directions are presented in the last section of the study.

  20. Bandwidth management for mobile mode of mobile monitoring system for Indonesian Volcano

    NASA Astrophysics Data System (ADS)

    Evita, Maria; Djamal, Mitra; Zimanowski, Bernd; Schilling, Klaus

    2017-01-01

    Volcano monitoring requires the system which has high-fidelity operation and real-time acquisition. MONICA (Mobile Monitoring System for Indonesian Volcano), a system based on Wireless Sensor Network, mobile robot and satellite technology has been proposed to fulfill this requirement for volcano monitoring system in Indonesia. This system consists of fixed-mode for normal condition and mobile mode for emergency situation. The first and second modes have been simulated in slow motion earthquake cases of Merapi Volcano, Indonesia. In this research, we have investigated the application of our bandwidth management for high-fidelity operation and real time acquisition in mobile mode of a strong motion earthquake from this volcano. The simulation result showed that our system still could manage the bandwidth even when there were 2 died fixed node after had stroked by the lightning. This result (64% to 83% throughput in average) was still better than the bandwidth utilized by the existing equipment (0% throughput because of the broken seismometer).

  1. DEAP-3600 Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Lindner, Thomas

    2015-12-01

    DEAP-3600 is a dark matter experiment using liquid argon to detect Weakly Interacting Massive Particles (WIMPs). The DEAP-3600 Data Acquisition (DAQ) has been built using a combination of commercial and custom electronics, organized using the MIDAS framework. The DAQ system needs to suppress a high rate of background events from 39Ar beta decays. This suppression is implemented using a combination of online firmware and software-based event filtering. We will report on progress commissioning the DAQ system, as well as the development of the web-based user interface.

  2. Modular data acquisition system and its use in gas-filled detector readout at ESRF

    NASA Astrophysics Data System (ADS)

    Sever, F.; Epaud, F.; Poncet, F.; Grave, M.; Rey-Bakaikoa, V.

    1996-09-01

    Since 1992, 18 ESRF beamlines are open to users. Although the data acquisition requirements vary a lot from one beamline to another, we are trying to implement a modular data acquisition system architecture that would fit with the maximum number of acquisition projects at ESRF. Common to all of these systems are large acquisition memories and the requirement to visualize the data during an acquisition run and to transfer them quickly after the run to safe storage. We developed a general memory API handling the acquisition memory and its organization and another library that provides calls for transferring the data over TCP/IP sockets. Interesting utility programs using these libraries are the `online display' program and the `data transfer' program. The data transfer program as well as an acquisition control program rely on our well-established `device server model', which was originally designed for the machine control system and then successfully reused in beamline control systems. In the second half of this paper, the acquisition system for a 2D gas-filled detector is presented, which is one of the first concrete examples using the proposed modular data acquisition architecture.

  3. Small Unix data acquisition system

    NASA Astrophysics Data System (ADS)

    Engberg, D.; Glanzman, T.

    1994-02-01

    A R&D program has been established to investigate the use of Unix in the various aspects of experimental computation. Earlier R&D work investigated the basic real-time aspects of the IBMRS/6000 workstation running AIX, which claims to be a real-time operating system. The next step in this R&D is the construction of prototype data acquisition system which attempts to exercise many of the features needed in the final on-line system in a realistic situation. For this project, we have combined efforts with a team studying the use of novel cell designs and gas mixtures in a new prototype drift chamber.

  4. Real-Time Rocket/Vehicle System Integrated Health Management Laboratory For Development and Testing of Health Monitoring/Management Systems

    NASA Technical Reports Server (NTRS)

    Aguilar, R.

    2006-01-01

    Pratt & Whitney Rocketdyne has developed a real-time engine/vehicle system integrated health management laboratory, or testbed, for developing and testing health management system concepts. This laboratory simulates components of an integrated system such as the rocket engine, rocket engine controller, vehicle or test controller, as well as a health management computer on separate general purpose computers. These general purpose computers can be replaced with more realistic components such as actual electronic controllers and valve actuators for hardware-in-the-loop simulation. Various engine configurations and propellant combinations are available. Fault or failure insertion capability on-the-fly using direct memory insertion from a user console is used to test system detection and response. The laboratory is currently capable of simulating the flow-path of a single rocket engine but work is underway to include structural and multiengine simulation capability as well as a dedicated data acquisition system. The ultimate goal is to simulate as accurately and realistically as possible the environment in which the health management system will operate including noise, dynamic response of the engine/engine controller, sensor time delays, and asynchronous operation of the various components. The rationale for the laboratory is also discussed including limited alternatives for demonstrating the effectiveness and safety of a flight system.

  5. Information/Knowledge Acquisition Methods for Decision Support Systems and Expert Systems.

    ERIC Educational Resources Information Center

    Yang, Heng-Li

    1995-01-01

    Compares information requirement-elicitation (IRE) methods for decision support systems (DSS) with knowledge acquisition (KA) methods for expert systems (ES) development. The definition and architectures of ES and DSS are compared and the systems' development cycles and IRE/KA methods are discussed. Differences are noted between ES and DSS…

  6. High frequency signal acquisition and control system based on DSP+FPGA

    NASA Astrophysics Data System (ADS)

    Liu, Xiao-qi; Zhang, Da-zhi; Yin, Ya-dong

    2017-10-01

    This paper introduces a design and implementation of high frequency signal acquisition and control system based on DSP + FPGA. The system supports internal/external clock and internal/external trigger sampling. It has a maximum sampling rate of 400MBPS and has a 1.4GHz input bandwidth for the ADC. Data can be collected continuously or periodically in systems and they are stored in DDR2. At the same time, the system also supports real-time acquisition, the collected data after digital frequency conversion and Cascaded Integrator-Comb (CIC) filtering, which then be sent to the CPCI bus through the high-speed DSP, can be assigned to the fiber board for subsequent processing. The system integrates signal acquisition and pre-processing functions, which uses high-speed A/D, high-speed DSP and FPGA mixed technology and has a wide range of uses in data acquisition and recording. In the signal processing, the system can be seamlessly connected to the dedicated processor board. The system has the advantages of multi-selectivity, good scalability and so on, which satisfies the different requirements of different signals in different projects.

  7. A Four Channel Beam Current Monitor Data Acquisition System Using Embedded Processors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wheat, Jr., Robert Mitchell; Dalmas, Dale A.; Dale, Gregory E.

    2015-08-11

    Data acquisition from multiple beam current monitors is required for electron accelerator production of Mo-99. A two channel system capable of recording data from two beam current monitors has been developed, is currently in use, and is discussed below. The development of a cost-effective method of extending this system to more than two channels and integrating of these measurements into an accelerator control system is the main focus of this report. Data from these current monitors is digitized, processed, and stored by a digital data acquisition system. Limitations and drawbacks with the currently deployed digital data acquisition system have beenmore » identified as have been potential solutions, or at least improvements, to these problems. This report will discuss and document the efforts we've made in improving the flexibility and lowering the cost of the data acquisition system while maintaining the minimum requirements.« less

  8. Goldstone R/D High Speed Data Acquisition System

    NASA Technical Reports Server (NTRS)

    Deutsch, L. J.; Jurgens, R. F.; Brokl, S. S.

    1984-01-01

    A digital data acquisition system that meets the requirements of several users (initially the planetary radar program) is planned for general use at Deep Space Station 14 (DSS 14). The system, now partially complete, is controlled by VAX 11/780 computer that is programmed in high level languages. A DEC Data Controller is included for moderate-speed data acquisition, low speed data display, and for a digital interface to special user-provided devices. The high-speed data acquisition is performed in devices that are being designed and built at JPL. Analog IF signals are converted to a digitized 50 MHz real signal. This signal is filtered and mixed digitally to baseband after which its phase code (a PN sequence in the case of planetary radar) is removed. It may then be accumulated (or averaged) and fed into the VAX through an FPS 5210 array processor. Further data processing before entering the VAX is thus possible (computation and accumulation of the power spectra, for example). The system is to be located in the research and development pedestal at DSS 14 for easy access by researchers in radio astronomy as well as telemetry processing and antenna arraying.

  9. Automated management for pavement inspection system (AMPIS)

    NASA Astrophysics Data System (ADS)

    Chung, Hung Chi; Girardello, Roberto; Soeller, Tony; Shinozuka, Masanobu

    2003-08-01

    An automated in-situ road surface distress surveying and management system, AMPIS, has been developed on the basis of video images within the framework of GIS software. Video image processing techniques are introduced to acquire, process and analyze the road surface images obtained from a moving vehicle. ArcGIS platform is used to integrate the routines of image processing and spatial analysis in handling the full-scale metropolitan highway surface distress detection and data fusion/management. This makes it possible to present user-friendly interfaces in GIS and to provide efficient visualizations of surveyed results not only for the use of transportation engineers to manage road surveying documentations, data acquisition, analysis and management, but also for financial officials to plan maintenance and repair programs and further evaluate the socio-economic impacts of highway degradation and deterioration. A review performed in this study on fundamental principle of Pavement Management System (PMS) and its implementation indicates that the proposed approach of using GIS concept and its tools for PMS application will reshape PMS into a new information technology-based system providing a convenient and efficient pavement inspection and management.

  10. The development of an airborne information management system for flight test

    NASA Technical Reports Server (NTRS)

    Bever, Glenn A.

    1992-01-01

    An airborne information management system is being developed at the NASA Dryden Flight Research Facility. This system will improve the state of the art in management data acquisition on-board research aircraft. The design centers around highly distributable, high-speed microprocessors that allow data compression, digital filtering, and real-time analysis. This paper describes the areas of applicability, approach to developing the system, potential for trouble areas, and reasons for this development activity. System architecture (including the salient points of what makes it unique), design philosophy, and tradeoff issues are also discussed.

  11. Data Acquisition System of Nobeyama MKID Camera

    NASA Astrophysics Data System (ADS)

    Nagai, M.; Hisamatsu, S.; Zhai, G.; Nitta, T.; Nakai, N.; Kuno, N.; Murayama, Y.; Hattori, S.; Mandal, P.; Sekimoto, Y.; Kiuchi, H.; Noguchi, T.; Matsuo, H.; Dominjon, A.; Sekiguchi, S.; Naruse, M.; Maekawa, J.; Minamidani, T.; Saito, M.

    2018-05-01

    We are developing a superconducting camera based on microwave kinetic inductance detectors (MKIDs) to observe 100-GHz continuum with the Nobeyama 45-m telescope. A data acquisition (DAQ) system for the camera has been designed to operate the MKIDs with the telescope. This system is required to connect the telescope control system (COSMOS) to the readout system of the MKIDs (MKID DAQ) which employs the frequency-sweeping probe scheme. The DAQ system is also required to record the reference signal of the beam switching for the demodulation by the analysis pipeline in order to suppress the sky fluctuation. The system has to be able to merge and save all data acquired both by the camera and by the telescope, including the cryostat temperature and pressure and the telescope pointing. A collection of software which implements these functions and works as a TCP/IP server on a workstation was developed. The server accepts commands and observation scripts from COSMOS and then issues commands to MKID DAQ to configure and start data acquisition. We made a commissioning of the MKID camera on the Nobeyama 45-m telescope and obtained successful scan signals of the atmosphere and of the Moon.

  12. Workshop on data acquisition and trigger system simulations for high energy physics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-12-31

    This report discusses the following topics: DAQSIM: A data acquisition system simulation tool; Front end and DCC Simulations for the SDC Straw Tube System; Simulation of Non-Blocklng Data Acquisition Architectures; Simulation Studies of the SDC Data Collection Chip; Correlation Studies of the Data Collection Circuit & The Design of a Queue for this Circuit; Fast Data Compression & Transmission from a Silicon Strip Wafer; Simulation of SCI Protocols in Modsim; Visual Design with vVHDL; Stochastic Simulation of Asynchronous Buffers; SDC Trigger Simulations; Trigger Rates, DAQ & Online Processing at the SSC; Planned Enhancements to MODSEM II & SIMOBJECT -- anmore » Overview -- R.; DAGAR -- A synthesis system; Proposed Silicon Compiler for Physics Applications; Timed -- LOTOS in a PROLOG Environment: an Algebraic language for Simulation; Modeling and Simulation of an Event Builder for High Energy Physics Data Acquisition Systems; A Verilog Simulation for the CDF DAQ; Simulation to Design with Verilog; The DZero Data Acquisition System: Model and Measurements; DZero Trigger Level 1.5 Modeling; Strategies Optimizing Data Load in the DZero Triggers; Simulation of the DZero Level 2 Data Acquisition System; A Fast Method for Calculating DZero Level 1 Jet Trigger Properties and Physics Input to DAQ Studies.« less

  13. Acquisition Management for Systems-of-Systems: Analysis of Alternatives via Computational Exploratory Model

    DTIC Science & Technology

    2012-02-03

    node to the analysis of eigenmodes (connected trees /networks) of disruption sequences. The identification of disruption eigenmodes is particularly...investment portfolio approach enables the identification of optimal SoS network topologies and provides a tool for acquisition professionals to...a program based on its ability to provide a new capability for a given cost, and not on its ability to meet specific performance requirements ( Spacy

  14. Acquisition Systems Protection Planning the Manhatten Project: A Case Study

    DTIC Science & Technology

    1994-06-03

    This study examines the counterintelligence and security programs of the Manhattan Project , the United States acquisition of the atomic bomb, using...assessment methodology and counterintelligence techniques and procedures. Acquisition systems, Program protection, Manhattan Project , Atomic bomb, Technology protection, Counterintelligence, Security.

  15. System Description for Tank 241-AZ-101 Waste Retrieval Data Acquisition System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROMERO, S.G.

    2000-02-14

    The proposed activity provides the description of the Data Acquisition System for Tank 241-AZ-101. This description is documented in HNF-5572, Tank 241-AZ-101 Waste Retrieval Data Acquisition System (DAS). This activity supports the planned mixer pump tests for Tank 241-AZ-101. Tank 241-AZ-101 has been selected for the first full-scale demonstration of a mixer pump system. The tank currently holds over 960,000 gallons of neutralized current acid waste, including approximately 12.7 inches of settling solids (sludge) at the bottom of the tank. As described in Addendum 4 of the FSAR (LMHC 2000a), two 300 HP mixer pumps with associated measurement and monitoringmore » equipment have been installed in Tank 241-AZ-101. The purpose of the Tank 241-AZ-101 retrieval system Data Acquisition System (DAS) is to provide monitoring and data acquisition of key parameters in order to confirm the effectiveness of the mixer pumps utilized for suspending solids in the tank. The suspension of solids in Tank 241-AZ-101 is necessary for pretreatment of the neutralized current acid waste and eventual disposal as glass via the Hanford Waste Vitrification Plant. HNF-5572 provides a basic description of the Tank 241-AZ-101 retrieval system DAS, including the field instrumentation and application software. The DAS is provided to fulfill requirements for data collection and monitoring. This document is not an operations procedure or is it intended to describe the mixing operation. This USQ screening provides evaluation of HNF-5572 (Revision 1) including the changes as documented on ECN 654001. The changes include (1) add information on historical trending and data backup, (2) modify DAS I/O list in Appendix E to reflect actual conditions in the field, and (3) delete IP address in Appendix F per Lockheed Martin Services, Inc. request.« less

  16. A system design of data acquisition and processing for side-scatter lidar

    NASA Astrophysics Data System (ADS)

    Zhang, ZhanYe; Xie, ChenBo; Wang, ZhenZhu; Kuang, ZhiQiang; Deng, Qian; Tao, ZongMing; Liu, Dong; Wang, Yingjian

    2018-03-01

    A system for collecting data of Side-Scatter lidar based on Charge Coupled Device (CCD),is designed and implemented. The system of data acquisition is based on Microsoft. Net structure and the language of C# is used to call dynamic link library (DLL) of CCD for realization of the real-time data acquisition and processing. The software stores data as txt file for post data acquisition and analysis. The system has ability to operate CCD device in all-day, automatic, continuous and high frequency data acquisition and processing conditions, which will catch 24-hour information of the atmospheric scatter's light intensity and retrieve the spatial and temporal properties of aerosol particles. The experimental result shows that the system is convenient to observe the aerosol optical characteristics near surface.

  17. Data-Acquisition System With Remotely Adjustable Amplifiers

    NASA Technical Reports Server (NTRS)

    Nurge, Mark A.; Larson, William E.; Hallberg, Carl G.; Thayer, Steven W.; Ake, Jeffrey C.; Gleman, Stuart M.; Thompson, David L.; Medelius, Pedro J.; Crawford, Wayne A.; Vangilder, Richard M.; hide

    1994-01-01

    Improved data-acquisition system has both centralized and decentralized characteristics developed. Provides infrastructure for automation and standardization of operation, maintenance, calibration, and adjustment of many transducers. Increases efficiency by reducing need for diminishing work force of highly trained technicians to perform routine tasks. Large industrial and academic laboratory facilities benefit from systems like this one.

  18. DOD Acquisition Information Management

    DTIC Science & Technology

    1994-09-30

    instead of on a real- time management information flow. The process of identifying risks and implementing corrective actions is lengthened by using the current system; performance measurement and reporting are impeded.

  19. 48 CFR 1511.011-79 - Information resources management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...

  20. 48 CFR 1511.011-79 - Information resources management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...

  1. 48 CFR 1511.011-79 - Information resources management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...

  2. 48 CFR 1511.011-79 - Information resources management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...

  3. 48 CFR 1511.011-79 - Information resources management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...

  4. 48 CFR 1052.234-71 - Notice of Earned Value Management System-Post-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Management System-Post-Award IBR (Core) AUG 2011 1052.234-71 Section 1052.234-71 Federal Acquisition... Texts of Provisions and Clauses 1052.234-71 Notice of Earned Value Management System—Post-Award IBR... require the contractor to use an earned value management system (EVMS) and for which the Government...

  5. 48 CFR 1052.234-70 - Notice of Earned Value Management System-Pre-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management System-Pre-Award IBR (Core) AUG 2011 1052.234-70 Section 1052.234-70 Federal Acquisition... Texts of Provisions and Clauses 1052.234-70 Notice of Earned Value Management System—Pre-Award IBR (Core... require the Contractor to use an earned value management system (EVMS) and for which the Government...

  6. 48 CFR 1052.234-70 - Notice of Earned Value Management System-Pre-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Management System-Pre-Award IBR (Core) AUG 2011 1052.234-70 Section 1052.234-70 Federal Acquisition... Texts of Provisions and Clauses 1052.234-70 Notice of Earned Value Management System—Pre-Award IBR (Core... require the Contractor to use an earned value management system (EVMS) and for which the Government...

  7. 48 CFR 1052.234-71 - Notice of Earned Value Management System-Post-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Management System-Post-Award IBR (Core) AUG 2011 1052.234-71 Section 1052.234-71 Federal Acquisition... Texts of Provisions and Clauses 1052.234-71 Notice of Earned Value Management System—Post-Award IBR... require the contractor to use an earned value management system (EVMS) and for which the Government...

  8. 48 CFR 1052.234-71 - Notice of Earned Value Management System-Post-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management System-Post-Award IBR (Core) AUG 2011 1052.234-71 Section 1052.234-71 Federal Acquisition... Texts of Provisions and Clauses 1052.234-71 Notice of Earned Value Management System—Post-Award IBR... require the contractor to use an earned value management system (EVMS) and for which the Government...

  9. 48 CFR 1052.234-70 - Notice of Earned Value Management System-Pre-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Management System-Pre-Award IBR (Core) AUG 2011 1052.234-70 Section 1052.234-70 Federal Acquisition... Texts of Provisions and Clauses 1052.234-70 Notice of Earned Value Management System—Pre-Award IBR (Core... require the Contractor to use an earned value management system (EVMS) and for which the Government...

  10. 48 CFR 1052.234-71 - Notice of Earned Value Management System-Post-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System-Post-Award IBR (Core) AUG 2011 1052.234-71 Section 1052.234-71 Federal Acquisition... Texts of Provisions and Clauses 1052.234-71 Notice of Earned Value Management System—Post-Award IBR... require the contractor to use an earned value management system (EVMS) and for which the Government...

  11. 48 CFR 1052.234-70 - Notice of Earned Value Management System-Pre-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System-Pre-Award IBR (Core) AUG 2011 1052.234-70 Section 1052.234-70 Federal Acquisition... Texts of Provisions and Clauses 1052.234-70 Notice of Earned Value Management System—Pre-Award IBR (Core... require the Contractor to use an earned value management system (EVMS) and for which the Government...

  12. Monitoring and Acquisition Real-time System (MARS)

    NASA Technical Reports Server (NTRS)

    Holland, Corbin

    2013-01-01

    MARS is a graphical user interface (GUI) written in MATLAB and Java, allowing the user to configure and control the Scalable Parallel Architecture for Real-Time Acquisition and Analysis (SPARTAA) data acquisition system. SPARTAA not only acquires data, but also allows for complex algorithms to be applied to the acquired data in real time. The MARS client allows the user to set up and configure all settings regarding the data channels attached to the system, as well as have complete control over starting and stopping data acquisition. It provides a unique "Test" programming environment, allowing the user to create tests consisting of a series of alarms, each of which contains any number of data channels. Each alarm is configured with a particular algorithm, determining the type of processing that will be applied on each data channel and tested against a defined threshold. Tests can be uploaded to SPARTAA, thereby teaching it how to process the data. The uniqueness of MARS is in its capability to be adaptable easily to many test configurations. MARS sends and receives protocols via TCP/IP, which allows for quick integration into almost any test environment. The use of MATLAB and Java as the programming languages allows for developers to integrate the software across multiple operating platforms.

  13. 29. Perimeter acquisition radar building room #318, data processing system ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Perimeter acquisition radar building room #318, data processing system area; data processor maintenance and operations center, showing data processing consoles - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  14. Simulation Based Acquisition for NASA's Office of Exploration Systems

    NASA Technical Reports Server (NTRS)

    Hale, Joe

    2004-01-01

    In January 2004, President George W. Bush unveiled his vision for NASA to advance U.S. scientific, security, and economic interests through a robust space exploration program. This vision includes the goal to extend human presence across the solar system, starting with a human return to the Moon no later than 2020, in preparation for human exploration of Mars and other destinations. In response to this vision, NASA has created the Office of Exploration Systems (OExS) to develop the innovative technologies, knowledge, and infrastructures to explore and support decisions about human exploration destinations, including the development of a new Crew Exploration Vehicle (CEV). Within the OExS organization, NASA is implementing Simulation Based Acquisition (SBA), a robust Modeling & Simulation (M&S) environment integrated across all acquisition phases and programs/teams, to make the realization of the President s vision more certain. Executed properly, SBA will foster better informed, timelier, and more defensible decisions throughout the acquisition life cycle. By doing so, SBA will improve the quality of NASA systems and speed their development, at less cost and risk than would otherwise be the case. SBA is a comprehensive, Enterprise-wide endeavor that necessitates an evolved culture, a revised spiral acquisition process, and an infrastructure of advanced Information Technology (IT) capabilities. SBA encompasses all project phases (from requirements analysis and concept formulation through design, manufacture, training, and operations), professional disciplines, and activities that can benefit from employing SBA capabilities. SBA capabilities include: developing and assessing system concepts and designs; planning manufacturing, assembly, transport, and launch; training crews, maintainers, launch personnel, and controllers; planning and monitoring missions; responding to emergencies by evaluating effects and exploring solutions; and communicating across the OEx

  15. A small Unix-based data acquisition system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engberg, D.; Glanzman, T.

    1994-02-01

    The proposed SLAC B Factory detector plans to use Unix-based machines for all aspects of computing, including real-time data acquisition and experimental control. A R and D program has been established to investigate the use of Unix in the various aspects of experimental computation. Earlier R and D work investigated the basic real-time aspects of the IBM RS/6000 workstation running AIX, which claims to be a real-time operating system. The next step in this R and D is the construction of a prototype data acquisition system which attempts to exercise many of the features needed in the final on-line systemmore » in a realistic situation. For this project, the authors have combined efforts with a team studying the use of novel cell designs and gas mixtures in a new prototype drift chamber.« less

  16. 2 CFR 200.2 - Acquisition cost.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 2 Grants and Agreements 1 2014-01-01 2014-01-01 false Acquisition cost. 200.2 Section 200.2 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT... REQUIREMENTS FOR FEDERAL AWARDS Acronyms and Definitions Acronyms § 200.2 Acquisition cost. Acquisition cost...

  17. Acquisition/expulsion system for earth orbital propulsion system study. Volume 5: Earth storable design

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A comprehensive analysis and parametric design effort was conducted under the earth-storable phase of the program. Passive Acquisition/expulsion system concepts were evaluated for a reusable Orbital Maneuvering System (OMS) application. The passive surface tension technique for providing gas free liquid on demand was superior to other propellant acquisition methods. Systems using fine mesh screens can provide the requisite stability and satisfy OMS mission requirements. Both fine mesh screen liner and trap systems were given detailed consideration in the parametric design, and trap systems were selected for this particular application. These systems are compatible with the 100- to 500-manned mission reuse requirements.

  18. An accelerated forth data-acquisition system

    NASA Technical Reports Server (NTRS)

    Bowhill, S. A.; Rennier, A. D.

    1986-01-01

    A new data acquisition system was put into operation at Urbana in August 1984. It uses a standard Apple 2 microcomputer with 48 k RAM and a standard 5 1/4 inch floppy disk. Design criteria for the system is given. The system was implemented using fig-FORTH, a threaded interpretive language which permits easy interfacing to machine code. The throughput of this system is better by a factor of 6 than the PDP-15 minicomputer system previously used, and it has the real time display feature and provides the data in much more convenient form. The features which contribute to this improved performance is listed.

  19. A Multi-criterial Decision Support System for Forest Management

    Treesearch

    Donald Nute; Geneho Kim; Walter D. Potter; Mark J. Twery; H. Michael Rauscher; Scott Thomasma; Deborah Bennett; Peter Kollasch

    1999-01-01

    We describe a research project that has as its goal development of a full-featured decision support system for managing forested land to satisfy multiple criteria represented as timber, wildlife, water, ecological, and wildlife objectives. The decision process proposed for what was originally conceived of as a Northeast Decision Model (NED) includes data acquisition,...

  20. Data Acquisition System(DAS) Sustaining Engineering

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This paper presents general information describing the Data Acquisition System contract, a summary of objectives, tasks performed and completed. The hardware deliverables which are comprised of: 1) Two ground DAS units; 2) Two flight DAS units; 3) Logistic spares; and 4) Shipping containers are described. Also included are the data requirements and scope of the contract.

  1. On Board Data Acquisition System with Intelligent Transducers for Unmanned Aerial Vehicles

    NASA Astrophysics Data System (ADS)

    Rochala, Zdzisław

    2012-02-01

    This report presents conclusions from research project no. ON50900363 conducted at the Mechatronics Department, Military University of Technology in the years 2007-2010. As the main object of the study involved the preparation of a concept and the implementation of an avionics data acquisition system intended for research during flight of unmanned aerial vehicles of the mini class, this article presents a design of an avionics system and describes equipment solutions of a distributed measurement system intended for data acquisition consisting of intelligent transducers. The data collected during a flight controlled by an operator confirmed proper operation of the individual components of the data acquisition system.

  2. 77 FR 51496 - Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems AGENCY: Department of... Acquisition Regulation (FAR) to add a new subpart and contract clause for the basic safeguarding of contractor... information) that will be resident on or transiting through contractor information systems. DATES: Interested...

  3. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  4. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  5. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  6. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  7. Michigan Department of Transportation statewide advanced traffic management system (ATMS) procurement evaluation - phase I : software procurement.

    DOT National Transportation Integrated Search

    2009-04-01

    This project evaluates the process that was followed by MDOT and other stakeholders for the acquisition : of new Advanced Traffic Management System (ATMS) software aiming to integrate and facilitate the : management of various Intelligent Transportat...

  8. Improving a data-acquisition software system with abstract data type components

    NASA Technical Reports Server (NTRS)

    Howard, S. D.

    1990-01-01

    Abstract data types and object-oriented design are active research areas in computer science and software engineering. Much of the interest is aimed at new software development. Abstract data type packages developed for a discontinued software project were used to improve a real-time data-acquisition system under maintenance. The result saved effort and contributed to a significant improvement in the performance, maintainability, and reliability of the Goldstone Solar System Radar Data Acquisition System.

  9. Risk Management and Intangibles: The Role of Information in Customer Acquisition and Evaluation of Intangibles

    ERIC Educational Resources Information Center

    Alirezazadeh, Pantea

    2012-01-01

    This dissertation consists of three separate essays shaping around decision making and risk management in the presence of intangibles. More specifically I study the risk management aspect of information acquisition and the role of information signaling in communicating the value of intangible assets. Intangible asset has proved to be a…

  10. Unmanned Maritime Systems Incremental Acquisition Approach

    DTIC Science & Technology

    2016-12-01

    We find that current UMS acquisitions are utilizing previous acquisition reforms, but could benefit from additional contractor peer competition and...peer review. Additional cost and schedule benefits could result from contractor competition during build processes in each incremental process. We...acquisitions are utilizing previous acquisition reforms, but could benefit from additional contractor peer competition and peer review. Additional

  11. Development of remote data acquisition system based on OPC for brake test bench

    NASA Astrophysics Data System (ADS)

    Wang, Yiwei; Wu, Mengling; Tian, Chun; Ma, Tianhe

    2017-08-01

    The 1:1 train brake system test bench can be used to carry out brake-related adhesion-slid control, stability test, noise test and dynamic test. To collect data of the test bench, a data acquisition method is needed. In this paper, the remote data acquisition system of test bench is built by LabVIEW based on OPC technology. Unlike the traditional hardwire way connecting PLC acquisition module with sensors, the novel method is used to collect data and share them through the internal LAN built by Ethernet switches, which avoids the complex wiring interference in an easy, efficient and flexible way. The system has been successfully applied to the data acquisition activities of the comprehensive brake system test bench of CRRC Nanjing Puzhen Haitai Brake Equipment Co., Ltd., and the relationship test between the adhesion coefficient and the slip-ratio is realized. The speed signal, torque signal and brake disc temperature can be collected and displayed. The results show that the system is reliable, convenient, and efficient, and can meet the requirements of data acquisition.

  12. Air Force Management of the Defense Acquisition Workforce Development Fund: Opportunities for Improvement

    DTIC Science & Technology

    2016-01-01

    savings, such as subsidized cafeteria food and free snacks and beverages . 51 Work-Life Balance and Flexible Work Some of the perks described above...John A. Ausink, Lisa M. Harrington, Laura Werber, William A. Williams, John E. Boon, Jr., Michael H. Powell Air Force Management of the Defense...charter requires the Director of Acquisition Career Management in each of the services to provide DoD with measurable objectives and to track the

  13. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1989-01-01

    Archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are presented. Activities of the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) related to DSN advanced systems, systems implementation, and DSN operations are addressed. In addition, recent developments in the NASA SETI (Search for Extraterrestrial Intelligence) sky survey are summarized.

  14. NASA Data Acquisitions System (NDAS) Software Architecture

    NASA Technical Reports Server (NTRS)

    Davis, Dawn; Duncan, Michael; Franzl, Richard; Holladay, Wendy; Marshall, Peggi; Morris, Jon; Turowski, Mark

    2012-01-01

    The NDAS Software Project is for the development of common low speed data acquisition system software to support NASA's rocket propulsion testing facilities at John C. Stennis Space Center (SSC), White Sands Test Facility (WSTF), Plum Brook Station (PBS), and Marshall Space Flight Center (MSFC).

  15. Advanced Data Acquisition and Telemetry System

    NASA Image and Video Library

    2016-09-15

    The Advanced Data Acquisition and Telemetry System team includes front row from left Mario Soto, Sam Habbal, Tiffany Titas, RIchard Hang, Randy Torres, Thang Quach, Otto Schnarr, Matthew Waldersen, Karen Estes, Andy Olvera, Stanley Wertenberger and Rick Cordes. In the second row from left are John Atherly, Doug Boston, Tom Horn, Brady Rennie, Chris Birkinbine, Jim McNally, Martin Munday and Tony Lorek.

  16. Modular Wireless Data-Acquisition and Control System

    NASA Technical Reports Server (NTRS)

    Perotti, Jose; Lucena, Angel; Medelius, Pedro; Mata, Carlos; Eckhoff, Anthony; Blalock, Norman

    2004-01-01

    A modular wireless data-acquisition and control system, now in operation at Kennedy Space Center, offers high performance at relatively low cost. The system includes a central station and a finite number of remote stations that communicate with each other through low-power radio frequency (RF) links. Designed to satisfy stringent requirements for reliability, integrity of data, and low power consumption, this system could be reproduced and adapted to use in a broad range of settings.

  17. Data acquisition and readout system for the LUX dark matter experiment

    DOE PAGES

    Akerib, D. S.; Bai, X.; Bedikian, S.; ...

    2011-11-28

    LUX is a two-phase (liquid/gas) xenon time projection chamber designed to detect nuclear recoils from interactions with dark matter particles. Signals from the LUX detector are processed by custom-built analog electronics which provide properly shaped signals for the trigger and data acquisition (DAQ) systems. The DAQ is comprised of commercial digitizers with firmware customized for the LUX experiment. Data acquisition systems in rare-event searches must accommodate high rate and large dynamic range during precision calibrations involving radioactive sources, while also delivering low threshold for maximum sensitivity. The LUX DAQ meets these challenges using real-time baseline sup- pression that allows formore » a maximum event acquisition rate in excess of 1.5 kHz with virtually no deadtime. This work describes the LUX DAQ and the novel acquisition techniques employed in the LUX experiment.« less

  18. Trigger and data acquisition system for the N- N experiment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baldo-Ceolin, M.; Bobisut, F.; Bonaiti, V.

    1991-04-01

    In this paper the Trigger and Data Acquisition system of the N-{bar N} experiment at the Institute Laue-Langevin at Grenoble is presented, together with CAMAC modules especially designed for this experiment. The trigger system is organized on three logical levels; it works in the presence of a high level of beam induced noise, without beam pulse synchronization, looking for a very rare signal. The data acquisition is based on a MicroVax II computer, in a cluster with 4 VaxStations, the DAQP software developed at CERN. The system has been working for a year with high efficiency and reliability.

  19. A research of a high precision multichannel data acquisition system

    NASA Astrophysics Data System (ADS)

    Zhong, Ling-na; Tang, Xiao-ping; Yan, Wei

    2013-08-01

    The output signals of the focusing system in lithography are analog. To convert the analog signals into digital ones which are more flexible and stable to process, a desirable data acquisition system is required. The resolution of data acquisition, to some extent, affects the accuracy of focusing. In this article, we first compared performance between the various kinds of analog-to-digital converters (ADC) available on the market at the moment. Combined with the specific requirements (sampling frequency, converting accuracy, numbers of channels etc) and the characteristics (polarization, amplitude range etc) of the analog signals, the model of the ADC to be used as the core chip in our hardware design was determined. On this basis, we chose other chips needed in the hardware circuit that would well match with ADC, then the overall hardware design was obtained. Validation of our data acquisition system was verified through experiments and it can be demonstrated that the system can effectively realize the high resolution conversion of the multi-channel analog signals and give the accurate focusing information in lithography.

  20. War-gaming application for future space systems acquisition part 2: acquisition and bidding war-gaming modeling and simulation approaches for FFP and FPIF

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2017-05-01

    This paper describes cooperative and non-cooperative static Bayesian game models with complete and incomplete information for the development of optimum acquisition strategies associated with the Program and Technical Baseline (PTB) solutions obtained from Part 1 of this paper [1]. The optimum acquisition strategies discussed focus on achieving "Affordability" by incorporating contractors' bidding strategies into the government acquisition strategies for acquiring future space systems. The paper discusses System Engineering (SE) frameworks, analytical and simulation approaches and modeling for developing the optimum acquisition strategies from both the government and contractor perspectives for Firm Fixed Price (FFP) and Fixed Price Incentive Firm (FPIF) contract types.

  1. Risk, Uncertainty and Open Architecture in the DoD Acquisition System

    DTIC Science & Technology

    2011-09-01

    OPEN ARCHITECTURE IN THE DoD ACQUISITION SYSTEM by Scott F. Cole September 2011 Thesis Advisor: Thomas Housel Second Reader...DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE Risk, Uncertainty and Open Architecture in the DoD Acquisition System 5. FUNDING NUMBERS N...A number of risks and uncertainties will be identified and a determination will be made if Service Oriented Architecture (SOA) and Open

  2. Integrated Component-based Data Acquisition Systems for Aerospace Test Facilities

    NASA Technical Reports Server (NTRS)

    Ross, Richard W.

    2001-01-01

    The Multi-Instrument Integrated Data Acquisition System (MIIDAS), developed by the NASA Langley Research Center, uses commercial off the shelf (COTS) products, integrated with custom software, to provide a broad range of capabilities at a low cost throughout the system s entire life cycle. MIIDAS combines data acquisition capabilities with online and post-test data reduction computations. COTS products lower purchase and maintenance costs by reducing the level of effort required to meet system requirements. Object-oriented methods are used to enhance modularity, encourage reusability, and to promote adaptability, reducing software development costs. Using only COTS products and custom software supported on multiple platforms reduces the cost of porting the system to other platforms. The post-test data reduction capabilities of MIIDAS have been installed at four aerospace testing facilities at NASA Langley Research Center. The systems installed at these facilities provide a common user interface, reducing the training time required for personnel that work across multiple facilities. The techniques employed by MIIDAS enable NASA to build a system with a lower initial purchase price and reduced sustaining maintenance costs. With MIIDAS, NASA has built a highly flexible next generation data acquisition and reduction system for aerospace test facilities that meets customer expectations.

  3. Development of a knowledge acquisition tool for an expert system flight status monitor

    NASA Technical Reports Server (NTRS)

    Disbrow, J. D.; Duke, E. L.; Regenie, V. A.

    1986-01-01

    Two of the main issues in artificial intelligence today are knowledge acquisition dion and knowledge representation. The Dryden Flight Research Facility of NASA's Ames Research Center is presently involved in the design and implementation of an expert system flight status monitor that will provide expertise and knowledge to aid the flight systems engineer in monitoring today's advanced high-performance aircraft. The flight status monitor can be divided into two sections: the expert system itself and the knowledge acquisition tool. The knowledge acquisition tool, the means it uses to extract knowledge from the domain expert, and how that knowledge is represented for computer use is discussed. An actual aircraft system has been codified by this tool with great success. Future real-time use of the expert system has been facilitated by using the knowledge acquisition tool to easily generate a logically consistent and complete knowledge base.

  4. Development of a knowledge acquisition tool for an expert system flight status monitor

    NASA Technical Reports Server (NTRS)

    Disbrow, J. D.; Duke, E. L.; Regenie, V. A.

    1986-01-01

    Two of the main issues in artificial intelligence today are knowledge acquisition and knowledge representation. The Dryden Flight Research Facility of NASA's Ames Research Center is presently involved in the design and implementation of an expert system flight status monitor that will provide expertise and knowledge to aid the flight systems engineer in monitoring today's advanced high-performance aircraft. The flight status monitor can be divided into two sections: the expert system itself and the knowledge acquisition tool. This paper discusses the knowledge acquisition tool, the means it uses to extract knowledge from the domain expert, and how that knowledge is represented for computer use. An actual aircraft system has been codified by this tool with great success. Future real-time use of the expert system has been facilitated by using the knowledge acquisition tool to easily generate a logically consistent and complete knowledge base.

  5. 48 CFR 352.234-1 - Notice of earned value management system-pre-award Integrated Baseline Review.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management system-pre-award Integrated Baseline Review. 352.234-1 Section 352.234-1 Federal Acquisition... Texts of Provisions and Clauses 352.234-1 Notice of earned value management system—pre-award Integrated... provision: Notice of Earned Value Management System—Pre-Award Integrated Baseline Review (October 2008) The...

  6. 48 CFR 352.234-2 - Notice of earned value management system-post-award Integrated Baseline Review.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management system-post-award Integrated Baseline Review. 352.234-2 Section 352.234-2 Federal Acquisition... Texts of Provisions and Clauses 352.234-2 Notice of earned value management system—post-award Integrated... provision: Notice of Earned Value Management System—Post-Award Integrated Baseline Review (October 2008) (a...

  7. 48 CFR 352.234-2 - Notice of earned value management system-post-award Integrated Baseline Review.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management system-post-award Integrated Baseline Review. 352.234-2 Section 352.234-2 Federal Acquisition... Texts of Provisions and Clauses 352.234-2 Notice of earned value management system—post-award Integrated... provision: Notice of Earned Value Management System—Post-Award Integrated Baseline Review (October 2008) (a...

  8. 48 CFR 352.234-2 - Notice of earned value management system-post-award Integrated Baseline Review.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management system-post-award Integrated Baseline Review. 352.234-2 Section 352.234-2 Federal Acquisition... Texts of Provisions and Clauses 352.234-2 Notice of earned value management system—post-award Integrated... provision: Notice of Earned Value Management System—Post-Award Integrated Baseline Review (October 2008) (a...

  9. 48 CFR 352.234-1 - Notice of earned value management system-pre-award Integrated Baseline Review.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management system-pre-award Integrated Baseline Review. 352.234-1 Section 352.234-1 Federal Acquisition... Texts of Provisions and Clauses 352.234-1 Notice of earned value management system—pre-award Integrated... provision: Notice of Earned Value Management System—Pre-Award Integrated Baseline Review (October 2008) The...

  10. 48 CFR 352.234-1 - Notice of earned value management system-pre-award Integrated Baseline Review.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management system-pre-award Integrated Baseline Review. 352.234-1 Section 352.234-1 Federal Acquisition... Texts of Provisions and Clauses 352.234-1 Notice of earned value management system—pre-award Integrated... provision: Notice of Earned Value Management System—Pre-Award Integrated Baseline Review (October 2008) The...

  11. 48 CFR 352.234-2 - Notice of earned value management system-post-award Integrated Baseline Review.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management system-post-award Integrated Baseline Review. 352.234-2 Section 352.234-2 Federal Acquisition... Texts of Provisions and Clauses 352.234-2 Notice of earned value management system—post-award Integrated... provision: Notice of Earned Value Management System—Post-Award Integrated Baseline Review (October 2008) (a...

  12. 48 CFR 352.234-1 - Notice of earned value management system-pre-award Integrated Baseline Review.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management system-pre-award Integrated Baseline Review. 352.234-1 Section 352.234-1 Federal Acquisition... Texts of Provisions and Clauses 352.234-1 Notice of earned value management system—pre-award Integrated... provision: Notice of Earned Value Management System—Pre-Award Integrated Baseline Review (October 2008) The...

  13. The DZERO Level 3 Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Angstadt, R.; Brooijmans, G.; Chapin, D.; Clements, M.; Cutts, D.; Haas, A.; Hauser, R.; Johnson, M.; Kulyavtsev, A.; Mattingly, S. E. K.; Mulders, M.; Padley, P.; Petravick, D.; Rechenmacher, R.; Snyder, S.; Watts, G.

    2004-06-01

    The DZERO experiment began RunII datataking operation at Fermilab in spring 2001. The physics program of the experiment requires the Level 3 data acquisition (DAQ) system system to handle average event sizes of 250 kilobytes at a rate of 1 kHz. The system routes and transfers event fragments of approximately 1-20 kilobytes from 63 VME crate sources to any of approximately 100 processing nodes. It is built upon a Cisco 6509 Ethernet switch, standard PCs, and commodity VME single board computers (SBCs). The system has been in full operation since spring 2002.

  14. A Low-Cost Data Acquisition System for Automobile Dynamics Applications

    PubMed Central

    González, Alejandro; Vinolas, Jordi

    2018-01-01

    This project addresses the need for the implementation of low-cost acquisition technology in the field of vehicle engineering: the design, development, manufacture, and verification of a low-cost Arduino-based data acquisition platform to be used in <80 Hz data acquisition in vehicle dynamics, using low-cost accelerometers. In addition to this, a comparative study is carried out of professional vibration acquisition technologies and low-cost systems, obtaining optimum results for low- and medium-frequency operations with an error of 2.19% on road tests. It is therefore concluded that these technologies are applicable to the automobile industry, thereby allowing the project costs to be reduced and thus facilitating access to this kind of research that requires limited resources. PMID:29382039

  15. A Low-Cost Data Acquisition System for Automobile Dynamics Applications.

    PubMed

    González, Alejandro; Olazagoitia, José Luis; Vinolas, Jordi

    2018-01-27

    This project addresses the need for the implementation of low-cost acquisition technology in the field of vehicle engineering: the design, development, manufacture, and verification of a low-cost Arduino-based data acquisition platform to be used in <80 Hz data acquisition in vehicle dynamics, using low-cost accelerometers. In addition to this, a comparative study is carried out of professional vibration acquisition technologies and low-cost systems, obtaining optimum results for low- and medium-frequency operations with an error of 2.19% on road tests. It is therefore concluded that these technologies are applicable to the automobile industry, thereby allowing the project costs to be reduced and thus facilitating access to this kind of research that requires limited resources.

  16. A real-time data-acquisition and analysis system with distributed UNIX workstations

    NASA Astrophysics Data System (ADS)

    Yamashita, H.; Miyamoto, K.; Maruyama, K.; Hirosawa, H.; Nakayoshi, K.; Emura, T.; Sumi, Y.

    1996-02-01

    A compact data-acquisition system using three RISC/UNIX™ workstations (SUN™/SPARCstation™) with real-time capabilities of monitoring and analysis has been developed for the study of photonuclear reactions with the large-acceptance spectrometer TAGX. One workstation acquires data from memory modules in the front-end electronics (CAMAC and TKO) with a maximum speed of 300 Kbytes/s, where data size times instantaneous rate is 1 Kbyte × 300 Hz. Another workstation, which has real-time capability for run monitoring, gets the data with a buffer manager called NOVA. The third workstation analyzes the data and reconstructs the event. In addition to a general hardware and software description, priority settings and run control by shell scripts are described. This system has recently been used successfully in a two month long experiment.

  17. Wireless Data-Acquisition System for Testing Rocket Engines

    NASA Technical Reports Server (NTRS)

    Lin, Chujen; Lonske, Ben; Hou, Yalin; Xu, Yingjiu; Gang, Mei

    2007-01-01

    A prototype wireless data-acquisition system has been developed as a potential replacement for a wired data-acquisition system heretofore used in testing rocket engines. The traditional use of wires to connect sensors, signal-conditioning circuits, and data acquisition circuitry is time-consuming and prone to error, especially when, as is often the case, many sensors are used in a test. The system includes one master and multiple slave nodes. The master node communicates with a computer via an Ethernet connection. The slave nodes are powered by rechargeable batteries and are packaged in weatherproof enclosures. The master unit and each of the slave units are equipped with a time-modulated ultra-wide-band (TMUWB) radio transceiver, which spreads its RF energy over several gigahertz by transmitting extremely low-power and super-narrow pulses. In this prototype system, each slave node can be connected to as many as six sensors: two sensors can be connected directly to analog-to-digital converters (ADCs) in the slave node and four sensors can be connected indirectly to the ADCs via signal conditioners. The maximum sampling rate for streaming data from any given sensor is about 5 kHz. The bandwidth of one channel of the TM-UWB radio communication system is sufficient to accommodate streaming of data from five slave nodes when they are fully loaded with data collected through all possible sensor connections. TM-UWB radios have a much higher spatial capacity than traditional sinusoidal wave-based radios. Hence, this TM-UWB wireless data-acquisition can be scaled to cover denser sensor setups for rocket engine test stands. Another advantage of TM-UWB radios is that it will not interfere with existing wireless transmission. The maximum radio-communication range between the master node and a slave node for this prototype system is about 50 ft (15 m) when the master and slave transceivers are equipped with small dipole antennas. The range can be increased by changing to

  18. Top DoD Management Challenges, Fiscal Year 2018

    DTIC Science & Technology

    2018-01-01

    Afghan Human Resource Information Management System to validate ANDSF personnel numbers and salaries; • Afghan Personnel Pay System to facilitate...unit strength accountability and personnel verification; and • Core Information Management System to improve accountability of equipment inventories...ACQUISITION AND CONTRACT MANAGEMENT Federal Acquisition Regulation requires contractor performance information be collected in the Contractor

  19. An SSH key management system: easing the pain of managing key/user/account associations

    NASA Astrophysics Data System (ADS)

    Arkhipkin, D.; Betts, W.; Lauret, J.; Shiryaev, A.

    2008-07-01

    Cyber security requirements for secure access to computing facilities often call for access controls via gatekeepers and the use of two-factor authentication. Using SSH keys to satisfy the two factor authentication requirement has introduced a potentially challenging task of managing the keys and their associations with individual users and user accounts. Approaches for a facility with the simple model of one remote user corresponding to one local user would not work at facilities that require a many-to-many mapping between users and accounts on multiple systems. We will present an SSH key management system we developed, tested and deployed to address the many-to-many dilemma in the environment of the STAR experiment. We will explain its use in an online computing context and explain how it makes possible the management and tracing of group account access spread over many sub-system components (data acquisition, slow controls, trigger, detector instrumentation, etc.) without the use of shared passwords for remote logins.

  20. Information management system: A summary discussion. [for use in the space shuttle sortie, modular space station and TDR satellite

    NASA Technical Reports Server (NTRS)

    Sayers, R. S.

    1972-01-01

    An information management system is proposed for use in the space shuttle sortie, the modular space station, the tracking data relay satellite and associated ground support systems. Several different information management functions, including data acquisition, transfer, storage, processing, control and display are integrated in the system.

  1. Magnetic Field Response Measurement Acquisition System

    NASA Technical Reports Server (NTRS)

    Woodard, Stanley E. (Inventor); Taylor, Bryant D. (Inventor); Shams, Qamar A. (Inventor); Fox, Robert L. (Inventor); Fox, Christopher L. (Inventor); Fox, Melanie L. (Inventor); Bryant, Robert G. (Inventor)

    2006-01-01

    Magnetic field response sensors designed as passive inductor-capacitor circuits produce magnetic field responses whose harmonic frequencies correspond to states of physical properties for which the sensors measure. Power to the sensing element is acquired using Faraday induction. A radio frequency antenna produces the time varying magnetic field used for powering the sensor, as well as receiving the magnetic field response of the sensor. An interrogation architecture for discerning changes in sensor s response kequency, resistance and amplitude is integral to the method thus enabling a variety of measurements. Multiple sensors can be interrogated using this method, thus eliminating the need to have a data acquisition channel dedicated to each sensor. The method does not require the sensors to be in proximity to any form of acquisition hardware. A vast array of sensors can be used as interchangeable parts in an overall sensing system.

  2. 48 CFR 970.1706 - Management and operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Management and operating contracts. 970.1706 Section 970.1706 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1706 Management and operating contracts...

  3. A Longitudinal Study and Color Rating System of Acquisition Cost Growth

    DTIC Science & Technology

    2017-03-23

    Cost Growth, Defense Acquisition Review Journal, 11(1), 78-91. 89 REPORT DOCUMENTATION PAGE Form Approved OMB No. 074-0188 The public ...Air Force Institute of Technology AFIT Scholar Theses and Dissertations 3-23-2017 A Longitudinal Study and Color Rating System of Acquisition Cost

  4. Risk Management Considerations for Interoperable Acquisition

    DTIC Science & Technology

    2006-08-01

    Electronics Engineers (IEEE) to harmonize the standards for software (IEEE 12207 ) and system (IEEE 15288) life-cycle processes. A goal of this harmonization...management ( ISO /IEC 16085) is being generalized to apply to the systems level. The revised, generalized standard will add require- ments and guidance for the...risk management. The documents include the following: • ISO /IEC Guide 73: Risk Management—Vocabulary—Guidelines for use in stan- dards [ ISO 02

  5. Design of Smart-Meter data acquisition device based on Cloud Platform

    NASA Astrophysics Data System (ADS)

    Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng

    2018-05-01

    In recent years, the government has attached great importance to ‘Four-Meter Unified’ Project. Under the call of national policy, State Grid is participate in building ‘Four-Meter Unified’ Project actively by making use of electricity information acquisition system. In this paper, a new type Smart-Meter data acquisition device based on Cloud Platform is designed according to the newest series of standards Energy Measure and Management System for Electric, Water, Gas and Heat Meter, and this paper introduces the general scheme, main hardware design and main software design for the Smart-Meter data acquisition device.

  6. Thermal management system technology development for space station applications

    NASA Technical Reports Server (NTRS)

    Rankin, J. G.; Marshall, P. F.

    1983-01-01

    A short discussion of the history to date of the NASA thermal management system technology development program is presented, and the current status of several ongoing studies and hardware demonstration tasks is reported. One element of technology that is required for long-life, high-power orbital platforms/stations that is being developed is heat rejection and a space-constructable radiator system. Aspects of this project include high-efficiency fin concepts, a heat pipe quick-disconnect device, high-capacity heat pipes, and an alternate interface heat exchanger design. In the area of heat acquisition and transport, developments in a pumped two-phase transport loop, a capillary pumped transport loop using the concept of thermal utility are reported. An example of a thermal management system concept is provided.

  7. Development of a data acquisition system using a RISC/UNIX TM workstation

    NASA Astrophysics Data System (ADS)

    Takeuchi, Y.; Tanimori, T.; Yasu, Y.

    1993-05-01

    We have developed a compact data acquisition system on RISC/UNIX workstations. A SUN TM SPARCstation TM IPC was used, in which an extension bus "SBus TM" was linked to a VMEbus. The transfer rate achieved was better than 7 Mbyte/s between the VMEbus and the SUN. A device driver for CAMAC was developed in order to realize an interruptive feature in UNIX. In addition, list processing has been incorporated in order to keep the high priority of the data handling process in UNIX. The successful developments of both device driver and list processing have made it possible to realize the good real-time feature on the RISC/UNIX system. Based on this architecture, a portable and versatile data taking system has been developed, which consists of a graphical user interface, I/O handler, user analysis process, process manager and a CAMAC device driver.

  8. Development of a Unix/VME data acquisition system

    NASA Astrophysics Data System (ADS)

    Miller, M. C.; Ahern, S.; Clark, S. M.

    1992-01-01

    The current status of a Unix-based VME data acquisition development project is described. It is planned to use existing Fortran data collection software to drive the existing CAMAC electronics via a VME CAMAC branch driver card and associated Daresbury Unix driving software. The first usable Unix driver has been written and produces single-action CAMAC cycles from test software. The data acquisition code has been implemented in test mode under Unix with few problems and effort is now being directed toward finalizing calls to the CAMAC-driving software and ultimate evaluation of the complete system.

  9. 48 CFR 945.570-1 - Acquisition of motor vehicles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... vehicles. 945.570-1 Section 945.570-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT... vehicles. (a) GSA Interagency Fleet Management System (GSA-IFMS) is the first source of supply for providing motor vehicles to contractors; however, contracting officer approval is required for contractors...

  10. A low-power data acquisition system for geomagnetic observatories and variometer stations

    NASA Astrophysics Data System (ADS)

    Morschhauser, Achim; Haseloff, Jürgen; Bronkalla, Oliver; Müller-Brettschneider, Carsten; Matzka, Jürgen

    2017-09-01

    A modern geomagnetic observatory must provide data of high stability, continuity, and resolution. The INTERMAGNET network has therefore specified quantitative criteria to ensure a high quality standard of geomagnetic observatories. Here, we present a new data acquisition system which was designed to meet these criteria, in particular with respect to 1 Hz data. This system is based on a Raspberry Pi embedded PC and runs a C+ + data acquisition software. As a result, the data acquisition system is modular, cheap, and flexible, and it can be operated in remote areas with limited power supply. In addition, the system is capable of near-real-time data transmission, using a reverse SSH tunnel to work with any network available. The system hardware was successfully tested at the Niemegk observatory for a period of 1 year and subsequently installed at the Tatuoca observatory in Brazil.

  11. Fluid management systems technology summaries

    NASA Technical Reports Server (NTRS)

    Stark, J. A.; Blatt, M. H.; Bennett, F. O., Jr.; Campbell, B. J.

    1974-01-01

    A summarization and categorization of the pertinent literature associated with fluid management systems technology having potential application to in-orbit fluid transfer and/or associated storage are presented. A literature search was conducted to obtain pertinent documents for review. Reports determined to be of primary significance were summarized in the following manner: (1) report identification, (2) objective(s) of the work, (3) description of pertinent work performed, (4) major results, and (5) comments of the reviewer. Pertinent figures are presented on a single facing page separate from the text. Specific areas covered are: fluid line dynamics and thermodynamics, low-g mass gauging, other instrumentation, stratification/pressurization, low-g vent systems, fluid mixing refrigeration and reliquefaction, and low-g interface control and liquid acquisition systems. Reports which were reviewed and not summarized, along with reasons for not summarizing, are also listed.

  12. Concepts for fast acquisition in optical communications systems

    NASA Astrophysics Data System (ADS)

    Wilkerson, Brandon L.; Giggenbach, Dirk; Epple, Bernhard

    2006-09-01

    As free-space laser communications systems proliferate due to improved technology and transmission techniques, optical communication networks comprised of ground stations, aircraft, high altitude platforms, and satellites become an attainable goal. An important consideration for optical networks is the ability of optical communication terminals (OCT) to quickly locate one another and align their laser beams to initiate the acquisition sequence. This paper investigates promising low-cost technologies and novel approaches that will facilitate the targeting and acquisition tasks between counter terminals. Specifically, two critical technology areas are investigated: position determination (which includes location and attitude determination) and inter-terminal communications. A feasibility study identified multiple-antenna global navigation satellite system (GNSS) systems and GNSS-aided inertial systems as possible position determination solutions. Personal satellite communication systems (e.g. Iridium or Inmarsat), third generation cellular technology (IMT-2000/UMTS), and a relatively new air traffic surveillance technology called Autonomous Dependent Surveillance-Broadcast (ADS-B) were identified as possible inter-terminal communication solutions. A GNSS-aided inertial system and an ADS-B system were integrated into an OCT to demonstrate their utility in a typical optical communication scenario. Testing showed that these technologies have high potential in future OCTs, although improvements can be made to both to increase tracking accuracy.

  13. User Manual for the AZ-101 Data Acquisition System (AS-101 DAS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BRAYTON, D.D.

    2000-02-17

    User manual for the TK AZ-101 Waste Retrieval System Data Acquisition System. The purpose of this document is to describe use of the AZ-101 Data Acquisition System (AZ-101 DAS). The AZ-101 DAS is provided to fulfill the requirements for data collection and monitoring as defined in Letters of Instruction (LOI) from Numatec Hanford Corporation (NHC) to Fluor Federal Services (FFS). For a complete description of the system, including design, please refer to the AZ-101 DAS System Description document, RPP-5572.

  14. The LUX experiment - trigger and data acquisition systems

    NASA Astrophysics Data System (ADS)

    Druszkiewicz, Eryk

    2013-04-01

    The Large Underground Xenon (LUX) detector is a two-phase xenon time projection chamber designed to detect interactions of dark matter particles with the xenon nuclei. Signals from the detector PMTs are processed by custom-built analog electronics which provide properly shaped signals for the trigger and data acquisition (DAQ) systems. During calibrations, both systems must be able to handle high rates and have large dynamic ranges; during dark matter searches, maximum sensitivity requires low thresholds. The trigger system uses eight-channel 64-MHz digitizers (DDC-8) connected to a Trigger Builder (TB). The FPGA cores on the digitizers perform real-time pulse identification (discriminating between S1 and S2-like signals) and event localization. The TB uses hit patterns, hit maps, and maximum response detection to make trigger decisions, which are reached within few microseconds after the occurrence of an event of interest. The DAQ system is comprised of commercial digitizers with customized firmware. Its real-time baseline suppression allows for a maximum event acquisition rate in excess of 1.5 kHz, which results in virtually no deadtime. The performance of the trigger and DAQ systems during the commissioning runs of LUX will be discussed.

  15. Low-cost optical data acquisition system for blade vibration measurement

    NASA Technical Reports Server (NTRS)

    Posta, Stephen J.

    1988-01-01

    A low cost optical data acquisition system was designed to measure deflection of vibrating rotor blade tips. The basic principle of the new design is to record raw data, which is a set of blade arrival times, in memory and to perform all processing by software following a run. This approach yields a simple and inexpensive system with the least possible hardware. Functional elements of the system were breadboarded and operated satisfactorily during rotor simulations on the bench, and during a data collection run with a two-bladed rotor in the Lewis Research Center Spin Rig. Software was written to demonstrate the sorting and processing of data stored in the system control computer, after retrieval from the data acquisition system. The demonstration produced an accurate graphical display of deflection versus time.

  16. 41 CFR 109-25.104 - Acquisition of office furniture and office machines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Acquisition of office furniture and office machines. 109-25.104 Section 109-25.104 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 25-GENERAL 25....

  17. L-C Measurement Acquisition Method for Aerospace Systems

    NASA Technical Reports Server (NTRS)

    Woodard, Stanley E.; Taylor, B. Douglas; Shams, Qamar A.; Fox, Robert L.

    2003-01-01

    This paper describes a measurement acquisition method for aerospace systems that eliminates the need for sensors to have physical connection to a power source (i.e., no lead wires) or to data acquisition equipment. Furthermore, the method does not require the sensors to be in proximity to any form of acquisition hardware. Multiple sensors can be interrogated using this method. The sensors consist of a capacitor, C(p), whose capacitance changes with changes to a physical property, p, electrically connected to an inductor, L. The method uses an antenna to broadcast electromagnetic energy that electrically excites one or more inductive-capacitive sensors via Faraday induction. This method facilitates measurements that were not previously possible because there was no practical means of providing power and data acquisition electrical connections to a sensor. Unlike traditional sensors, which measure only a single physical property, the manner in which the sensing element is interrogated simultaneously allows measurement of at least two unrelated physical properties (e.g., displacement rate and fluid level) by using each constituent of the L-C element. The key to using the method for aerospace applications is to increase the distance between the L-C elements and interrogating antenna; develop all key components to be non-obtrusive and to develop sensing elements that can easily be implemented. Techniques that have resulted in increased distance between antenna and sensor will be presented. Fluid-level measurements and pressure measurements using the acquisition method are demonstrated in the paper.

  18. It System Integration: Global Medical Acquisition of Health Tech Case Study

    ERIC Educational Resources Information Center

    Russo, Mark; White, Bruce

    2013-01-01

    Mergers and Acquisitions are just part of life in business. For example, in the health care technology field in 2012, Veritas Capital Partners acquired Thomson Reuters' Healthcare. Other major active acquisition companies included: Medical Transcription Billing, T-System Technologies and Sharecare. In this case study, a larger health technology…

  19. Low-power analog integrated circuits for wireless ECG acquisition systems.

    PubMed

    Tsai, Tsung-Heng; Hong, Jia-Hua; Wang, Liang-Hung; Lee, Shuenn-Yuh

    2012-09-01

    This paper presents low-power analog ICs for wireless ECG acquisition systems. Considering the power-efficient communication in the body sensor network, the required low-power analog ICs are developed for a healthcare system through miniaturization and system integration. To acquire the ECG signal, a low-power analog front-end system, including an ECG signal acquisition board, an on-chip low-pass filter, and an on-chip successive-approximation analog-to-digital converter for portable ECG detection devices is presented. A quadrature CMOS voltage-controlled oscillator and a 2.4 GHz direct-conversion transmitter with a power amplifier and upconversion mixer are also developed to transmit the ECG signal through wireless communication. In the receiver, a 2.4 GHz fully integrated CMOS RF front end with a low-noise amplifier, differential power splitter, and quadrature mixer based on current-reused folded architecture is proposed. The circuits have been implemented to meet the specifications of the IEEE 802.15.4 2.4 GHz standard. The low-power ICs of the wireless ECG acquisition systems have been fabricated using a 0.18 μm Taiwan Semiconductor Manufacturing Company (TSMC) CMOS standard process. The measured results on the human body reveal that ECG signals can be acquired effectively by the proposed low-power analog front-end ICs.

  20. Followup Audit: Enterprise Blood Management System Not Ready for Full Deployment

    DTIC Science & Technology

    2014-10-23

    Executive ( CAE ) for DHA considered these two systems as a single Defense acquisition category III automated information system.2 According to the...the improved integration of blood products inventory management and shipment availability. The CAE for DHA is the milestone decision authority for...to officials, the capability is a web-based IT product used to track blood products in theater. Specifically, theater-based medical treatment

  1. 48 CFR 208.7003-1 - Assignments under integrated materiel management (IMM).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Assignments under integrated materiel management (IMM). 208.7003-1 Section 208.7003-1 Federal Acquisition Regulations System... SUPPLIES AND SERVICES Coordinated Acquisition 208.7003-1 Assignments under integrated materiel management...

  2. 48 CFR 208.7003-1 - Assignments under integrated materiel management (IMM).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Assignments under integrated materiel management (IMM). 208.7003-1 Section 208.7003-1 Federal Acquisition Regulations System... SUPPLIES AND SERVICES Coordinated Acquisition 208.7003-1 Assignments under integrated materiel management...

  3. 48 CFR 208.7003-1 - Assignments under integrated materiel management (IMM).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Assignments under integrated materiel management (IMM). 208.7003-1 Section 208.7003-1 Federal Acquisition Regulations System... SUPPLIES AND SERVICES Coordinated Acquisition 208.7003-1 Assignments under integrated materiel management...

  4. 48 CFR 208.7003-1 - Assignments under integrated materiel management (IMM).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Assignments under integrated materiel management (IMM). 208.7003-1 Section 208.7003-1 Federal Acquisition Regulations System... SUPPLIES AND SERVICES Coordinated Acquisition 208.7003-1 Assignments under integrated materiel management...

  5. 48 CFR 208.7003-1 - Assignments under integrated materiel management (IMM).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Assignments under integrated materiel management (IMM). 208.7003-1 Section 208.7003-1 Federal Acquisition Regulations System... SUPPLIES AND SERVICES Coordinated Acquisition 208.7003-1 Assignments under integrated materiel management...

  6. A microprogrammed data acquisition system for renography.

    PubMed

    Imperiale, C

    1983-01-01

    The purpose of this project was to design an efficient, low cost, and portable system for renography suitable for clinical use. The principles involved in the renographic test, and the procedures and calculations which act on the design of our system, are given. The system consists of an Apple II Plus computer equipped with 48K memory, two disk drives with diskettes of 143K each, a thermal printer with graphic capability, the Microsoft Z80 card, and an interface which is specifically designed for renographic data acquisition.

  7. Implications of DOD Funds Execution Policy for Acquisition Program Management

    DTIC Science & Technology

    2014-08-01

    I N S T I T U T E F O R D E F E N S E A N A L Y S E S IDA Paper P-5164 August 2014 Implications of DOD Funds Execution Policy for Acquisition...One of the goals of sound financial management practice is that the DOD spends the money that Congress appropriates for national defense in a timely...require execution of funds for any particular program to take place later than planned. That situation creates a natural conflict between two

  8. Magnetic Field Response Measurement Acquisition System

    NASA Technical Reports Server (NTRS)

    Woodward, Stanley E. (Inventor); Taylor, Bryant D. (Inventor)

    2007-01-01

    Magnetic field response sensors designed as passive inductor- capacit or circuits produce magnetic field responses whose harmonic frequenci es correspond to states of physical properties for which the sensors measure. Power to the sensing element is acquired using Faraday induc tion. A radio frequency antenna produces the time varying magnetic fi eld used for powering the sensor, as well as receiving the magnetic field response of the sensor. An interrogation architecture for disce rning changes in sensor's response frequency, resistance and amplitud e is integral to the method thus enabling a variety of measurements. Multiple sensors can be interrogated using this method, thus eliminat ing the need to have a data acquisition channel dedicated to each se nsor. The method does not require the sensors to be in proximity to a ny form of acquisition hardware. A vast array of sensors can be used as interchangeable parts in an overall sensing system.

  9. 48 CFR 970.0370 - Management Controls and Improvements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Management Controls and Improvements. 970.0370 Section 970.0370 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY... Conflicts of Interest 970.0370 Management Controls and Improvements. ...

  10. 48 CFR 1034.004 - Acquisition strategy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Order, Task Order, or Interagency Agreement) to the overall investment requirements and management... investment; (3) A description of the effort, by acquisition, and the plans to include required clauses in the... requirements to manage the acquisition processes through the investment lifecycle; (7) Consideration of optimal...

  11. Microcomputer-Based Acquisitions.

    ERIC Educational Resources Information Center

    Desmarais, Norman

    1986-01-01

    This discussion of three automated acquisitions systems--Bib-Base/Acq, The Book Trak Ordering System, and Card Datalog Acquisitions Module--covers searching and updating, editing, acquisitions functions and statistics, purchase orders and order file, budgeting and accounts maintenance, defining parameters, documentation, security, printing, and…

  12. Are You Experienced The Case for Acquisition Professional Qualification Standards

    DTIC Science & Technology

    2015-10-01

    1, DAU 236), featuring a cover story on micro machines used in defense systems. The winners for Defense AT&L were managing edi - tor/senior editor of...Gonzalez, copy edi - tor and circulation manager; and Noelia Gamboa, editorial support. Defense AT&L’s sister DAU publication, the Defense Acquisition

  13. EARS : Repositioning data management near data acquisition.

    NASA Astrophysics Data System (ADS)

    Sinquin, Jean-Marc; Sorribas, Jordi; Diviacco, Paolo; Vandenberghe, Thomas; Munoz, Raquel; Garcia, Oscar

    2016-04-01

    The EU FP7 Projects Eurofleets and Eurofleets2 are an European wide alliance of marine research centers that aim to share their research vessels, to improve information sharing on planned, current and completed cruises, on details of ocean-going research vessels and specialized equipment, and to durably improve cost-effectiveness of cruises. Within this context logging of information on how, when and where anything happens on board of the vessel is crucial information for data users in a later stage. This forms a primordial step in the process of data quality control as it could assist in the understanding of anomalies and unexpected trends recorded in the acquired data sets. In this way completeness of the metadata is improved as it is recorded accurately at the origin of the measurement. The collection of this crucial information has been done in very different ways, using different procedures, formats and pieces of software in the context of the European Research Fleet. At the time that the Eurofleets project started, every institution and country had adopted different strategies and approaches, which complicated the task of users that need to log general purpose information and events on-board whenever they access a different platform loosing the opportunity to produce this valuable metadata on-board. Among the many goals the Eurofleets project has, a very important task is the development of an "event log software" called EARS (Eurofleets Automatic Reporting System) that enables scientists and operators to record what happens during a survey. EARS will allow users to fill, in a standardized way, the gap existing at the moment in metadata description that only very seldom links data with its history. Events generated automatically by acquisition instruments will also be handled, enhancing the granularity and precision of the event annotation. The adoption of a common procedure to log survey events and a common terminology to describe them is crucial to provide

  14. A Data Acquisition System (DAS) for marine and ecological research from aerospace technology

    NASA Technical Reports Server (NTRS)

    Johnson, R. A.

    1972-01-01

    The efforts of researchers at Mississippi State University to utilize space-age technology in the development of a self-contained, portable data acquisition system for use in marine and ecological research are presented. The compact, lightweight data acquisition system is capable of recording 14 variables in its present configuration and is suitable for use in either a boat, pickup truck, or light aircraft. This system will provide the acquisition of reliable data on the structure of the environment and the effect of man-made and natural activities on the observed phenomenon. Utilizing both self-contained analog recording and a telemetry transmitter for real-time digital readout and recording, the prototype system has undergone extensive testing.

  15. Training Systems Product Group (TSPG) Training Systems Acquisition (TSA)

    DTIC Science & Technology

    2006-05-23

    ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12 . DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release...Planned Actions • TSA III – Acquisition Strategy – Small Business • TSA II Points of Contact 3 Dominant Air Power: Design For Tomorrow…Deliver Today...Provides ready access to Large and Small Businesses Specializing in Air Force Training Systems Primarily Supporting Wright Patterson AFB OH and Hill AFB

  16. Privacy Impact Assessment for the EPA Acquisition System

    EPA Pesticide Factsheets

    The EPA Acquisition System collects data on the business process of acquiring goods in support of the Agency's mission. Learn how this data is collected, how it will be used, access to the data, the purpose of data collection, and record retention policies

  17. A Data Acquisition System Using Single-Chip Microcomputer

    NASA Astrophysics Data System (ADS)

    Yonyjiang, Dai; Jingkuan, Gao; Lin, Wan; Mingjia, Pi; Jingda, Nan

    1989-12-01

    A data acquisition system by single-chip microcomputer was designed. It is suitable to the future devlopment of the miniature tidar signal processing epuipment . The characteristics of frequecy response, SNR, D* and NEP of FM-CW CO2 coherent tidar were discussed.

  18. Reducing acquisition risk through integrated systems of systems engineering

    NASA Astrophysics Data System (ADS)

    Gross, Andrew; Hobson, Brian; Bouwens, Christina

    2016-05-01

    In the fall of 2015, the Joint Staff J7 (JS J7) sponsored the Bold Quest (BQ) 15.2 event and conducted planning and coordination to combine this event into a joint event with the Army Warfighting Assessment (AWA) 16.1 sponsored by the U.S. Army. This multipurpose event combined a Joint/Coalition exercise (JS J7) with components of testing, training, and experimentation required by the Army. In support of Assistant Secretary of the Army for Acquisition, Logistics, and Technology (ASA(ALT)) System of Systems Engineering and Integration (SoSE&I), Always On-On Demand (AO-OD) used a system of systems (SoS) engineering approach to develop a live, virtual, constructive distributed environment (LVC-DE) to support risk mitigation utilizing this complex and challenging exercise environment for a system preparing to enter limited user test (LUT). AO-OD executed a requirements-based SoS engineering process starting with user needs and objectives from Army Integrated Air and Missile Defense (AIAMD), Patriot units, Coalition Intelligence, Surveillance and Reconnaissance (CISR), Focused End State 4 (FES4) Mission Command (MC) Interoperability with Unified Action Partners (UAP), and Mission Partner Environment (MPE) Integration and Training, Tactics and Procedures (TTP) assessment. The SoS engineering process decomposed the common operational, analytical, and technical requirements, while utilizing the Institute of Electrical and Electronics Engineers (IEEE) Distributed Simulation Engineering and Execution Process (DSEEP) to provide structured accountability for the integration and execution of the AO-OD LVC-DE. As a result of this process implementation, AO-OD successfully planned for, prepared, and executed a distributed simulation support environment that responsively satisfied user needs and objectives, demonstrating the viability of an LVC-DE environment to support multiple user objectives and support risk mitigation activities for systems in the acquisition process.

  19. Near Theoretical Gigabit Link Efficiency for Distributed Data Acquisition Systems.

    PubMed

    Abu-Nimeh, Faisal T; Choong, Woon-Seng

    2017-03-01

    Link efficiency, data integrity, and continuity for high-throughput and real-time systems is crucial. Most of these applications require specialized hardware and operating systems as well as extensive tuning in order to achieve high efficiency. Here, we present an implementation of gigabit Ethernet data streaming which can achieve 99.26% link efficiency while maintaining no packet losses. The design and implementation are built on OpenPET, an opensource data acquisition platform for nuclear medical imaging, where (a) a crate hosting multiple OpenPET detector boards uses a User Datagram Protocol over Internet Protocol (UDP/IP) Ethernet soft-core, that is capable of understanding PAUSE frames, to stream data out to a computer workstation; (b) the receiving computer uses Netmap to allow the processing software (i.e., user space), which is written in Python, to directly receive and manage the network card's ring buffers, bypassing the operating system kernel's networking stack; and (c) a multi-threaded application using synchronized queues is implemented in the processing software (Python) to free up the ring buffers as quickly as possible while preserving data integrity and flow continuity.

  20. Near Theoretical Gigabit Link Efficiency for Distributed Data Acquisition Systems

    PubMed Central

    Abu-Nimeh, Faisal T.; Choong, Woon-Seng

    2017-01-01

    Link efficiency, data integrity, and continuity for high-throughput and real-time systems is crucial. Most of these applications require specialized hardware and operating systems as well as extensive tuning in order to achieve high efficiency. Here, we present an implementation of gigabit Ethernet data streaming which can achieve 99.26% link efficiency while maintaining no packet losses. The design and implementation are built on OpenPET, an opensource data acquisition platform for nuclear medical imaging, where (a) a crate hosting multiple OpenPET detector boards uses a User Datagram Protocol over Internet Protocol (UDP/IP) Ethernet soft-core, that is capable of understanding PAUSE frames, to stream data out to a computer workstation; (b) the receiving computer uses Netmap to allow the processing software (i.e., user space), which is written in Python, to directly receive and manage the network card’s ring buffers, bypassing the operating system kernel’s networking stack; and (c) a multi-threaded application using synchronized queues is implemented in the processing software (Python) to free up the ring buffers as quickly as possible while preserving data integrity and flow continuity. PMID:28630948

  1. A wearable 12-lead ECG acquisition system with fabric electrodes.

    PubMed

    Haoshi Zhang; Lan Tian; Huiyang Lu; Ming Zhou; Haiqing Zou; Peng Fang; Fuan Yao; Guanglin Li

    2017-07-01

    Continuous electrocardiogram (ECG) monitoring is significant for prevention of heart disease and is becoming an important part of personal and family health care. In most of the existing wearable solutions, conventional metal sensors and corresponding chips are simply integrated into clothes and usually could only collect few leads of ECG signals that could not provide enough information for diagnosis of cardiac diseases such as arrhythmia and myocardial ischemia. In this study, a wearable 12-lead ECG acquisition system with fabric electrodes was developed and could simultaneously process 12 leads of ECG signals. By integrating the fabric electrodes into a T-shirt, the wearable system would provide a comfortable and convenient user interface for ECG recording. For comparison, the proposed fabric electrode and the gelled traditional metal electrodes were used to collect ECG signals on a subject, respectively. The approximate entropy (ApEn) of ECG signals from both types of electrodes were calculated. The experimental results show that the fabric electrodes could achieve similar performance as the gelled metal electrodes. This preliminary work has demonstrated that the developed ECG system with fabric electrodes could be utilized for wearable health management and telemedicine applications.

  2. MIRAGE: The data acquisition, analysis, and display system

    NASA Technical Reports Server (NTRS)

    Rosser, Robert S.; Rahman, Hasan H.

    1993-01-01

    Developed for the NASA Johnson Space Center and Life Sciences Directorate by GE Government Services, the Microcomputer Integrated Real-time Acquisition Ground Equipment (MIRAGE) system is a portable ground support system for Spacelab life sciences experiments. The MIRAGE system can acquire digital or analog data. Digital data may be NRZ-formatted telemetry packets of packets from a network interface. Analog signal are digitized and stored in experimental packet format. Data packets from any acquisition source are archived to a disk as they are received. Meta-parameters are generated from the data packet parameters by applying mathematical and logical operators. Parameters are displayed in text and graphical form or output to analog devices. Experiment data packets may be retransmitted through the network interface. Data stream definition, experiment parameter format, parameter displays, and other variables are configured using spreadsheet database. A database can be developed to support virtually any data packet format. The user interface provides menu- and icon-driven program control. The MIRAGE system can be integrated with other workstations to perform a variety of functions. The generic capabilities, adaptability and ease of use make the MIRAGE a cost-effective solution to many experimental data processing requirements.

  3. Software Reviews Since Acquisition Reform - The Artifact Perspective

    DTIC Science & Technology

    2004-01-01

    Risk Management OLD NEW Slide 13Acquisition of Software Intensive Systems 2004 – Peter Hantos Single, basic software paradigm Single processor Low...software risk mitigation related trade-offs must be done together Integral Software Engineering Activities Process Maturity and Quality Frameworks Quality

  4. Spacesuit Data Display and Management System

    NASA Technical Reports Server (NTRS)

    Hall, David G.; Sells, Aaron; Shah, Hemal

    2009-01-01

    A prototype embedded avionics system has been designed for the next generation of NASA extra-vehicular-activity (EVA) spacesuits. The system performs biomedical and other sensor monitoring, image capture, data display, and data transmission. An existing NASA Phase I and II award winning design for an embedded computing system (ZIN vMetrics - BioWATCH) has been modified. The unit has a reliable, compact form factor with flexible packaging options. These innovations are significant, because current state-of-the-art EVA spacesuits do not provide capability for data displays or embedded data acquisition and management. The Phase 1 effort achieved Technology Readiness Level 4 (high fidelity breadboard demonstration). The breadboard uses a commercial-grade field-programmable gate array (FPGA) with embedded processor core that can be upgraded to a space-rated device for future revisions.

  5. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Risk management. 1815.203-72 Section 1815.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  6. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Risk management. 1815.203-72 Section 1815.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  7. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Risk management. 1815.203-72 Section 1815.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  8. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Risk management. 1815.203-72 Section 1815.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  9. Making Acquisition Measurable

    DTIC Science & Technology

    2011-04-30

    Corporation. All rights reserved End Users Administrator/ Maintainer (A/M) Subject Matter Expert ( SME ) Trainer/ Instructor Manager, Evaluator, Supervisor... CMMI ) - Acquisition (AQ) © 2011 The MITRE Corporation. All rights reserved 13 CMMI -Development Incremental iterative development (planning & execution...objectives Constructing games highlighting particular aspects of proposed CCOD® acquisition, and conducting exercises with Subject Matter Experts ( SMEs

  10. Update on the Department of the Navy Systems Engineering Career Competency Model Acquisition Activities

    DTIC Science & Technology

    2016-04-30

    Model Acquisition Activities Clifford Whitcomb, Systems Engineering Professor, NPS Corina White, Systems Engineering Research Associate, NPS...Engineering Acquisition Activities Karen Holness, Assistant Professor, NPS Update on the Department of the Navy Systems Engineering Career Competency Model ...Career Competency Model Clifford A. Whitcomb—is a Professor in the Systems Engineering Department at the Naval Postgraduate School, in Monterey, CA

  11. 76 FR 40280 - Major System Acquisition; Earned Value Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    .... FOR FURTHER INFORMATION CONTACT: Carl Weber, NASA, Office of Procurement, Contract Management Division (Suite 5K80); (202) 358-1784; e-mail: [email protected] . SUPPLEMENTARY INFORMATION: I. Background... external Earned Value Management Requirements. Response: The regulation in the NASA FAR Supplement, 1834...

  12. 77 FR 12336 - Public Availability of Office of Acquisitions and Contract Management FY 2011 Service Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... service contract inventory should be directed to Sandra R. Harrell in the Office of Acquisitions and Contract Management at 202-692-1107 or [email protected] . Dated: February 21, 2012. Sandra R...

  13. Tailoring Systems Engineering for Rapid Acquisition

    DTIC Science & Technology

    2014-03-27

    center’s focus would be the collection of lessons learned and the dissemination of the basic knowledge to the members who are conducting rapid acquisition...dictates that they rarely do lessons learned . Adding in the turnover of personnel and they reported that they make the same mistakes over and over...weapon system program of record designated by the CSAF. This is where the interviewee heard the phrase “when skating on thin ice your best asset is

  14. Operation of the Defense Acquisition System

    DTIC Science & Technology

    2008-12-08

    United States Code (l) DoD Directive 8320.02, “Data Sharing in a Net-Centric Department of Defense,” December 2, 2004 (m) DoD Instruction 5200.39...2004 (t) ISO 15418-1999- “EAN/ UCC Application Identifiers and Fact Data Identifiers and Maintenance” (u) ISO 15434-1999 – “Transfer Syntax for High...Acquisition Knowledge Sharing System7 (y) Section 644 of title 15, United States Code, “Procurement strategies; contract bundling” (z) Public Law 101-576

  15. Proceedings of Management of Risk and Uncertainty in the Acquisition of Major Programs, U. S. Air Force Academy, Colorado Springs, February 9-11, 1981

    DTIC Science & Technology

    1981-05-01

    Patterson AFB, OH. March, 1977. LD-45159A. 44. Moeller, William G. Affordability For Major System Acquisitions . Washington: Logistics...established in a penetrating manner by the keynote speaker. Brig. Gen. William Thurman, Commandant of the Defense Systems Management Co-lege. He reviewed...Capt. William Glover, who to a large extent were responsible for the concept of this second conference are no longer with us. It Is our fond hope

  16. Run control techniques for the Fermilab DART data acquisition system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oleynik, G.; Engelfried, J.; Mengel, L.

    1995-10-01

    DART is the high speed, Unix based data acquisition system being developed by the Fermilab Computing Division in collaboration with eight High Energy Physics Experiments. This paper describes DART run-control which implements flexible, distributed, extensible and portable paradigms for the control and monitoring of data acquisition systems. We discuss the unique and interesting aspects of the run-control - why we chose the concepts we did, the benefits we have seen from the choices we made, as well as our experiences in deploying and supporting it for experiments during their commissioning and sub-system testing phases. We emphasize the software and techniquesmore » we believe are extensible to future use, and potential future modifications and extensions for those we feel are not.« less

  17. Data acquisition system for the Belle experiment

    NASA Astrophysics Data System (ADS)

    Nakao, M.; Yamauchi, M.; Suzuki, S. Y.; Itoh, R.; Fujii, H.

    2000-04-01

    We built a data acquisition system for the Belle experiment at the KEK B-factory. The system is designed to record the signals from the detectors at 500 Hz trigger rate with a less than 10% dead time fraction. A typical event size is 30 kbyte, which corresponds to a data transfer rate of 15 Mbyte/s. Main components are two kinds of detector readout systems, an event builder, an online computer farm and a data storage system. The system has been reliably in operation at the design performance for a half year. We have completed cosmic-ray data taking for 2.5 months and have started physics data taking on Jun. 1, 1999.

  18. Migrating Legacy Systems in the Global Merger & Acquisition Environment

    ERIC Educational Resources Information Center

    Katerattanakul, Pairin; Kam, Hwee-Joo; Lee, James J.; Hong, Soongoo

    2009-01-01

    The MetaFrame system migration project at WorldPharma, while driven by merger and acquisition, had faced complexities caused by both technical challenges and organizational issues in the climate of uncertainties. However, WorldPharma still insisted on instigating this post-merger system migration project. This project served to (1) consolidate the…

  19. Access Control Management for SCADA Systems

    NASA Astrophysics Data System (ADS)

    Hong, Seng-Phil; Ahn, Gail-Joon; Xu, Wenjuan

    The information technology revolution has transformed all aspects of our society including critical infrastructures and led a significant shift from their old and disparate business models based on proprietary and legacy environments to more open and consolidated ones. Supervisory Control and Data Acquisition (SCADA) systems have been widely used not only for industrial processes but also for some experimental facilities. Due to the nature of open environments, managing SCADA systems should meet various security requirements since system administrators need to deal with a large number of entities and functions involved in critical infrastructures. In this paper, we identify necessary access control requirements in SCADA systems and articulate access control policies for the simulated SCADA systems. We also attempt to analyze and realize those requirements and policies in the context of role-based access control that is suitable for simplifying administrative tasks in large scale enterprises.

  20. Review of Supervisory Control and Data Acquisition (SCADA) Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reva Nickelson; Briam Johnson; Ken Barnes

    2004-01-01

    A review using open source information was performed to obtain data related to Supervisory Control and Data Acquisition (SCADA) systems used to supervise and control domestic electric power generation, transmission, and distribution. This report provides the technical details for the types of systems used, system disposal, cyber and physical security measures, network connections, and a gap analysis of SCADA security holes.

  1. Processes Asunder: Acquisition & Planning Misfits

    DTIC Science & Technology

    2009-03-26

    Establishing six Business Enterprise Priorities ( BEPs ) to focus the Department’s business transformation efforts, which now guide DoD investment decisions...three phases which look very much like Milestone A, B, and C of the previously existing Life Cycle Management Framework . With this obvious redundancy...February 2002). 30 6 Defense Acquisition University, “Integrated Defense Acquisition, Technology, & Logistics Life Cycle Management Framework , version 5.2

  2. Acquisition of Stereoscopic Particle Image Velocimetry System for Investigation of Unsteady Flows

    DTIC Science & Technology

    2016-04-30

    SECURITY CLASSIFICATION OF: The objective of the project titled “Acquisition of Stereoscopic Particle Image Velocimetry (S-PIV) System for...Distribution Unlimited UU UU UU UU 30-04-2016 1-Feb-2015 31-Jan-2016 Final Report: Acquisition of Stereoscopic Particle Image Velocimetry System For...ADDRESS (ES) U.S. Army Research Office P.O. Box 12211 Research Triangle Park, NC 27709-2211 Particle Image Velocimetry REPORT DOCUMENTATION PAGE 11

  3. A new scalable modular data acquisition system for SPECT (PET)

    NASA Astrophysics Data System (ADS)

    Stenstrom, P.; Rillbert, A.; Bergquist, M.; Habte, F.; Bohm, C.; Larsson, S. A.

    1998-06-01

    Describes a modular decentralized data acquisition system that continuously samples shaped PMT pulses from a SPECT detector. The pulse waveform data are used by signal processors to accurately reconstruct amplitude and time for each scintillation event. Data acquisition for a PMT channel is triggered in two alternative ways, either when its own signal exceeds a selected digital threshold, or when it receives a trigger pulse from one of its neighboring PMTs. The triggered region is restricted to seven, thirteen or nineteen neighboring PMT channels. Each acquisition module supports three PMT channels and connects to all other modules and a reconstruction computer via Firewire to cover the 72 channels in the Stockholm University/Karolinska Hospital cylindrical SPECT camera.

  4. Defense Acquisition Review Journal. Volume 14, Number 1, February 2007

    DTIC Science & Technology

    2007-02-01

    price, delivery schedules, or policies, such as the Berry Amendment Specialty Metals Clause,3 Critical Safety Items (CSI),4 and Business System Status...management, quality assurance, client care and subcontractor management. Ms. Shaw holds a BS in Business from University of Baltimore and a masters in...William Kleiner Matthew Popham A Business Model for Defense Acquisition under the Modular Open Systems Approach Eugene Gholz Decision Support for Best

  5. Introduction to Acquisition Management.

    DTIC Science & Technology

    1987-12-01

    reported to the SECDEF and the Defense Acquisition Executive. During this phase (the third of the life cycle), the systera, including all essential...will not be enough. R&M 2000 is a those military and civilian maintenance people cultural change within the Air Force and what they find frustrating or...Contracting Officer position. Respon- sibilities of contracting officers are divided : kud thne-phased; the contract is awarded by the Procuring Contracting

  6. 48 CFR 970.2904-1 - Management and operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Management and operating contracts. 970.2904-1 Section 970.2904-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Taxes 970.2904-1 Management and operating contracts. (a) Pursuant to 48 CFR 2...

  7. Merger of the DIAMANT Light Charge Particle Detector into the AFRODITE Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Murray, S. H. T.; Mullins, S. M.; Bark, R. A.; Gál, J.; Gueorguieva, E.; Hlatshwayo, T.; Juhász, K.; Kalinka, G.; Komati, F. S.; Krasznahorkay, A.; Lawrie, J. J.; Malwela, T.; Molnár, L.; Ntshangase, S.; Nyakó, B. M.; Pilcher, J. V.; Pucknell, V. F.; Sharpey-Schafer, J. F.; Scheurer, J. N.; Shirinda, O.; Timár, J.; Zolnai, L.

    2005-11-01

    The Chessboard section of the DIAMANT CsI detector array has been merged into the AFRODITE γ-ray spectrometer acquisition system. The details of the data acquisition merging is explained together with how consistency is maintained and ensured between the two distinct systems.

  8. 77 FR 2653 - Defense Federal Acquisition Regulation Supplement; Pilot Program for Acquisition of Military...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-19

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 212 and 252 RIN 0750-AH27 Defense Federal Acquisition Regulation Supplement; Pilot Program for Acquisition of Military-Purpose Nondevelopmental Items (DFARS Case 2011-D034) AGENCY: Defense Acquisition Regulations System...

  9. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering... monitored, funding availability, and program management risk. (c) Appropriate techniques should be applied...

  10. The wireless data acquisition system based on Bluetooth

    NASA Astrophysics Data System (ADS)

    Cheng, En; Xu, Xiao-na; Wu, Si-long

    2013-03-01

    Bluetooth is one of the wireless communication technology, which is developing rapidly in recent years. As a result of low cost and short distance, Bluetooth can set up a special connection for portable electronic devices and stationary electronic equipment communication environment. The paper studies a data acquisition system based on Bluetooth. The system can collect the angle of motor rotation and send it to the Receiver through the Bluetooth. The results show that the system can be run normal.[1

  11. 48 CFR 304.7001 - Numbering acquisitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Numbering acquisitions. 304.7001 Section 304.7001 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATIVE MATTERS Acquisition Instrument Identification Numbering System 304.7001 Numbering acquisitions. (a...

  12. A personal computer-based, multitasking data acquisition system

    NASA Technical Reports Server (NTRS)

    Bailey, Steven A.

    1990-01-01

    A multitasking, data acquisition system was written to simultaneously collect meteorological radar and telemetry data from two sources. This system is based on the personal computer architecture. Data is collected via two asynchronous serial ports and is deposited to disk. The system is written in both the C programming language and assembler. It consists of three parts: a multitasking kernel for data collection, a shell with pull down windows as user interface, and a graphics processor for editing data and creating coded messages. An explanation of both system principles and program structure is presented.

  13. Design of remote laser-induced fluorescence system's acquisition circuit

    NASA Astrophysics Data System (ADS)

    Wang, Guoqing; Lou, Yue; Wang, Ran; Yan, Debao; Li, Xin; Zhao, Xin; Chen, Dong; Zhao, Qi

    2017-10-01

    Laser-induced fluorescence system(LIfS) has been found its significant application in identifying one kind of substance from another by its properties even it's thimbleful, and becomes useful in plenty of fields. Many superior works have reported LIfS' theoretical analysis , designs and uses. However, the usual LIPS is always constructed in labs to detect matter quite closely, for the system using low-power laser as excitation source and charge coupled device (CCD) as detector. Promoting the detectivity of LIfS is of much concern to spread its application. Here, we take a high-energy narrow-pulse laser instead of commonly used continuous wave laser to operate sample, thus we can get strong fluorescent. Besides, photomultiplier (PMT) with high sensitivity is adopted in our system to detect extremely weak fluorescence after a long flight time from the sample to the detector. Another advantage in our system, as the fluorescence collected into spectroscopy, multiple wavelengths of light can be converted to the corresponding electrical signals with the linear array multichannel PMT. Therefore, at the cost of high-powered incentive and high-sensitive detector, a remote LIFS is get. In order to run this system, it is of importance to turn light signal to digital signal which can be processed by computer. The pulse width of fluorescence is deeply associated with excitation laser, at the nanosecond(ns) level, which has a high demand for acquisition circuit. We design an acquisition circuit including, I/V conversion circuit, amplifying circuit and peak-holding circuit. The simulation of circuit shows that peak-holding circuit can be one effective approach to reducing difficulty of acquisition circuit.

  14. Free-space laser communication system with rapid acquisition based on astronomical telescopes.

    PubMed

    Wang, Jianmin; Lv, Junyi; Zhao, Guang; Wang, Gang

    2015-08-10

    The general structure of a free-space optical (FSO) communication system based on astronomical telescopes is proposed. The light path for astronomical observation and for communication can be easily switched. A separate camera is used as a star sensor to determine the pointing direction of the optical terminal's antenna. The new system exhibits rapid acquisition and is widely applicable in various astronomical telescope systems and wavelengths. We present a detailed analysis of the acquisition time, which can be decreased by one order of magnitude compared with traditional optical communication systems. Furthermore, we verify software algorithms and tracking accuracy.

  15. Design and development of data acquisition system based on WeChat hardware

    NASA Astrophysics Data System (ADS)

    Wang, Zhitao; Ding, Lei

    2018-06-01

    Data acquisition system based on WeChat hardware provides methods for popularization and practicality of data acquisition. The whole system is based on WeChat hardware platform, where the hardware part is developed on DA14580 development board and the software part is based on Alibaba Cloud. We designed service module, logic processing module, data processing module and database module. The communication between hardware and software uses AirSync Protocal. We tested this system by collecting temperature and humidity data, and the result shows that the system can aquisite the temperature and humidity in real time according to settings.

  16. Design and Construction for Community Health Service Precision Fund Appropriation System Based on Performance Management.

    PubMed

    Gao, Xing; He, Yao; Hu, Hongpu

    2017-01-01

    Allowing for the differences in economy development, informatization degree and characteristic of population served and so on among different community health service organizations, community health service precision fund appropriation system based on performance management is designed, which can provide support for the government to appropriate financial funds scientifically and rationally for primary care. The system has the characteristic of flexibility and practicability, in which there are five subsystems including data acquisition, parameter setting, fund appropriation, statistical analysis system and user management.

  17. A PC-based single-ADC multi-parameter data acquisition system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woodring, M.; Kegel, G.H.R.; Egan, J.J.

    1995-10-01

    A personal computer (PC) based mult parameter data acquisition system using the Microsoft Window operating environment has been designed and constructed. An IBI AT compatible personal computer with an Intel 486DX5 microprocessor was combined with a National Instruments ATIDIO 32 digital I/O card, a single Canberra 8713 ADC with 13-bit resolution and a modified Canberra 8223 8-input analog multiplexer to acquil data from experiments carried out at the UML Van de Graa accelerator. The accelerator data acquisition (ADAC) computer environment was programmed in Microsoft Visual BASIC for use i Windows. ADAC allows event-mode data acquisition with up to eight parametersmore » (modifiable to 64) and the simultaneous display parameters during acquisition. Additional features of ADAC include replay of event-mode data and graphical analysis/display of data. TV ADAC environment is easy to upgrade or expand, inexpensive 1 implement, and is specifically designed to meet the needs of nuclei spectroscopy.« less

  18. Experimental validation of A-mode ultrasound acquisition system for computer assisted orthopaedic surgery

    NASA Astrophysics Data System (ADS)

    De Lorenzo, Danilo; De Momi, Elena; Beretta, Elisa; Cerveri, Pietro; Perona, Franco; Ferrigno, Giancarlo

    2009-02-01

    Computer Assisted Orthopaedic Surgery (CAOS) systems improve the results and the standardization of surgical interventions. Anatomical landmarks and bone surface detection is straightforward to either register the surgical space with the pre-operative imaging space and to compute biomechanical parameters for prosthesis alignment. Surface points acquisition increases the intervention invasiveness and can be influenced by the soft tissue layer interposition (7-15mm localization errors). This study is aimed at evaluating the accuracy of a custom-made A-mode ultrasound (US) system for non invasive detection of anatomical landmarks and surfaces. A-mode solutions eliminate the necessity of US images segmentation, offers real-time signal processing and requires less invasive equipment. The system consists in a single transducer US probe optically tracked, a pulser/receiver and an FPGA-based board, which is responsible for logic control command generation and for real-time signal processing and three custom-made board (signal acquisition, blanking and synchronization). We propose a new calibration method of the US system. The experimental validation was then performed measuring the length of known-shape polymethylmethacrylate boxes filled with pure water and acquiring bone surface points on a bovine bone phantom covered with soft-tissue mimicking materials. Measurement errors were computed through MR and CT images acquisitions of the phantom. Points acquisition on bone surface with the US system demonstrated lower errors (1.2mm) than standard pointer acquisition (4.2mm).

  19. Electronic system for data acquisition to study radiation effects on operating MOSFET transistors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alves de Oliveira, Juliano; Assis de Melo, Marco Antônio; Guazzelli da Silveira, Marcilei A.

    In this work we present the development of an acquisition system for characterizing transistors under X-ray radiation. The system is able to carry out the acquisition and to storage characteristic transistor curves. To test the acquisition system we have submitted polarized P channel MOS transistors under continuous 10-keV X-ray doses up to 1500 krad. The characterization system can operate in the saturation region or in the linear region in order to observe the behavior of the currents or voltages involved during the irradiation process. Initial tests consisted of placing the device under test (DUT) in front of the X-ray beammore » direction, while its drain current was constantly monitored through the prototype generated in this work, the data are stored continuously and system behavior was monitored during the test. In order to observe the behavior of the DUT during the radiation tests, we used an acquisition system that consists of an ultra-low consumption16-bit Texas Instruments MSP430 microprocessor. Preliminary results indicate linear behavior of the voltage as a function of the exposure time and fast recovery. These features may be favorable to use this device as a radiation dosimeter to monitor low rate X-ray.« less

  20. Automated acquisition system for routine, noninvasive monitoring of physiological data.

    PubMed

    Ogawa, M; Tamura, T; Togawa, T

    1998-01-01

    A fully automated, noninvasive data-acquisition system was developed to permit long-term measurement of physiological functions at home, without disturbing subjects' normal routines. The system consists of unconstrained monitors built into furnishings and structures in a home environment. An electrocardiographic (ECG) monitor in the bathtub measures heart function during bathing, a temperature monitor in the bed measures body temperature, and a weight monitor built into the toilet serves as a scale to record weight. All three monitors are connected to one computer and function with data-acquisition programs and a data format rule. The unconstrained physiological parameter monitors and fully automated measurement procedures collect data noninvasively without the subject's awareness. The system was tested for 1 week by a healthy male subject, aged 28, in laboratory-based facilities.

  1. Practice acquisition: a due diligence checklist. HFMA Principles and Practices Board.

    PubMed

    1995-12-01

    As healthcare executives act to form integrated healthcare systems that encompass entities such as physician-hospital organizations and medical group practices, they often discover that practical guidance on acquiring physician practices is scarce. To address the need for authoritative guidance on practice acquisition, HFMA's Principles and Practices Board has developed a detailed analysis of physician practices acquisition issues, Issues Analysis 95-1: Acquisition of Physician Practices. This analysis includes a detailed due diligence checklist developed to assist both healthcare financial managers involved in acquiring physician practices and physician owners interested in selling their practices.

  2. A Distributed Data Acquisition System for the Sensor Network of the TAWARA_RTM Project

    NASA Astrophysics Data System (ADS)

    Fontana, Cristiano Lino; Donati, Massimiliano; Cester, Davide; Fanucci, Luca; Iovene, Alessandro; Swiderski, Lukasz; Moretto, Sandra; Moszynski, Marek; Olejnik, Anna; Ruiu, Alessio; Stevanato, Luca; Batsch, Tadeusz; Tintori, Carlo; Lunardon, Marcello

    This paper describes a distributed Data Acquisition System (DAQ) developed for the TAWARA_RTM project (TAp WAter RAdioactivity Real Time Monitor). The aim is detecting the presence of radioactive contaminants in drinking water; in order to prevent deliberate or accidental threats. Employing a set of detectors, it is possible to detect alpha, beta and gamma radiations, from emitters dissolved in water. The Sensor Network (SN) consists of several heterogeneous nodes controlled by a centralized server. The SN cyber-security is guaranteed in order to protect it from external intrusions and malicious acts. The nodes were installed in different locations, along the water treatment processes, in the waterworks plant supplying the aqueduct of Warsaw, Poland. Embedded computers control the simpler nodes, and are directly connected to the SN. Local-PCs (LPCs) control the more complex nodes that consist signal digitizers acquiring data from several detectors. The DAQ in the LPC is split in several processes communicating with sockets in a local sub-network. Each process is dedicated to a very simple task (e.g. data acquisition, data analysis, hydraulics management) in order to have a flexible and fault-tolerant system. The main SN and the local DAQ networks are separated by data routers to ensure the cyber-security.

  3. GIS-based automated management of highway surface crack inspection system

    NASA Astrophysics Data System (ADS)

    Chung, Hung-Chi; Shinozuka, Masanobu; Soeller, Tony; Girardello, Roberto

    2004-07-01

    An automated in-situ road surface distress surveying and management system, AMPIS, has been developed on the basis of video images within the framework of GIS software. Video image processing techniques are introduced to acquire, process and analyze the road surface images obtained from a moving vehicle. ArcGIS platform is used to integrate the routines of image processing and spatial analysis in handling the full-scale metropolitan highway surface distress detection and data fusion/management. This makes it possible to present user-friendly interfaces in GIS and to provide efficient visualizations of surveyed results not only for the use of transportation engineers to manage road surveying documentations, data acquisition, analysis and management, but also for financial officials to plan maintenance and repair programs and further evaluate the socio-economic impacts of highway degradation and deterioration. A review performed in this study on fundamental principle of Pavement Management System (PMS) and its implementation indicates that the proposed approach of using GIS concept and its tools for PMS application will reshape PMS into a new information technology-based system that can provide convenient and efficient pavement inspection and management.

  4. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  5. Peruvian Weapon System Acquisition Process

    DTIC Science & Technology

    1990-12-01

    East bloc nations such as Rumania, Bulgaria, Poland, and Yugoslavia essentially retained all or much of their command economies. As these nations foray...The level of technology transfer is an absolut* essential determent for dictating the rate and complexity of Peruvian technologia advancement in the...cases greater than the acquisition cost, it is essential that such costs be considered in development and acquisition decisions in order that proper

  6. Development of an Integrated Data Acquisition System for a Small Flight Probe

    NASA Technical Reports Server (NTRS)

    Swanson, Gregory T.; Empey, Daniel M.; Skokova, Kristina A.; Venkatapathy, Ethiraj

    2012-01-01

    In support of the SPRITE concept, an integrated data acquisition system has been developed and fabricated for preliminary testing. The data acquisition system has been designed to condition traditional thermal protection system sensors, store their data to an on-board memory card, and in parallel, telemeter to an external system. In the fall of 2010, this system was integrated into a 14 in. diameter, 45 degree sphere cone probe instrumented with thermal protection system sensors. This system was then tested at the NASA Ames Research Center Aerodynamic Heating Facility's arc jet at approximately 170 W/sq. cm. The first test in December 2010 highlighted hardware design issues that were redesigned and implemented leading to a successful test in February 2011.

  7. 48 CFR 301.607 - Certification of Program and Project Managers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Certification of Program and Project Managers. 301.607 Section 301.607 Federal Acquisition Regulations System HEALTH AND HUMAN... Responsibilities 301.607 Certification of Program and Project Managers. ...

  8. Rocketdyne automated dynamics data analysis and management system

    NASA Technical Reports Server (NTRS)

    Tarn, Robert B.

    1988-01-01

    An automated dynamics data analysis and management systems implemented on a DEC VAX minicomputer cluster is described. Multichannel acquisition, Fast Fourier Transformation analysis, and an online database have significantly improved the analysis of wideband transducer responses from Space Shuttle Main Engine testing. Leakage error correction to recover sinusoid amplitudes and correct for frequency slewing is described. The phase errors caused by FM recorder/playback head misalignment are automatically measured and used to correct the data. Data compression methods are described and compared. The system hardware is described. Applications using the data base are introduced, including software for power spectral density, instantaneous time history, amplitude histogram, fatigue analysis, and rotordynamics expert system analysis.

  9. A FADC-Based Data Acquisition System for the KASCADE-Grande Experiment

    NASA Astrophysics Data System (ADS)

    Walkowiak, W.; Antoni, T.; Apel, W. D.; Badea, F.; Bekk, K.; Bercuci, A.; Bertaina, M.; Blumer, H.; Bozdog, H.; Brancus, I. M.; Bruggemann, M.; Buchholz, P.; Buttner, C.; Chiavassa, A.; Daumiller, K.; Dipierro, F.; Doll, P.; Engel, R.; Engler, J.; Febler, F.; Ghia, P. L.; Gils, H. J.; Glasstetter, R.; Haungs, A.; Heck, D.; Horandel, J. R.; Kampert, K.-H.; Klages, H. O.; Kolotaev, Y.; Maier, G.; Mathes, H. J.; Mayer, H. J.; Milke, J.; Mitrica, B.; Morello, C.; Muller, M.; Navarra, G.; Obenland, R.; Oehlschlager, J.; Ostapchenko, S.; Over, S.; Petcu, M.; Plewnia, S.; Rebel, H.; Risse, A.; Roth, M.; Schieler, H.; Scholz, J.; Stumpert, M.; Thouw, T.; Toma, G.; Trinchero, G. C.; Ulrich, H.; Valchierotti, S.; Vanburen, J.; Weindl, A.; Wochele, J.; Zabierowski, J.; Zagromski, S.; Zimmermann, D.

    2006-02-01

    We present the design and first test results of a new FADC-based data acquisition (DAQ) system for the Grande array of the KASCADE-Grande experiment. The original KASCADE experiment at the Forschungszentrum Karlsruhe, Germany, has been extended by 37 detector stations of the former EAS-TOP experiment (Grande array)to provide sensitivity to energies of primary particles from the cosmos of up to $10^{18}$ eV. The new FADC-based DAQ system will improve the quality of the data taken by the Grande array by digitizing the scintillator signals with a 250 MHz sampling rate. events per second. Two Grande stations have been equipped with the FADC-based data acquisition system and first data are shown.

  10. Development of the Data Acquisition and Processing System for a Pulsed 2-Micron Coherent Doppler Lidar System

    NASA Technical Reports Server (NTRS)

    Beyon, Jeffrey Y.; Koch, Grady J.; Kavaya, Michael J.

    2010-01-01

    A general overview of the development of a data acquisition and processing system is presented for a pulsed, 2-micron coherent Doppler Lidar system located in NASA Langley Research Center in Hampton, Virginia, USA. It is a comprehensive system that performs high-speed data acquisition, analysis, and data display both in real time and offline. The first flight missions are scheduled for the summer of 2010 as part of the NASA Genesis and Rapid Intensification Processes (GRIP) campaign for the study of hurricanes. The system as well as the control software is reviewed and its requirements and unique features are discussed.

  11. Developments of a new data acquisition system at ANNRI

    NASA Astrophysics Data System (ADS)

    Nakao, T.; Terada, K.; Kimura, A.; Nakamura, S.; Iwamoto, O.; Harada, H.; Katabuchi, T.; Igashira, M.; Hori, J.

    2017-09-01

    A new data acquisition system (DAQ system) has been developed at the Accurate Neutron-Nucleus Reaction Measurement Instrument (ANNRI) facility in the Japan Proton Accelerator Research Complex, Materials and Life Science Experimental Facility (J-PARC/MLF). DAQ systems for both the Ge detector system and the Li-glass detector system were tested by using a gold sample. The applicability of the time-of-flight method was checked. System performance was evaluated on the basis of digital conversion nonlinearity, energy resolution, multi-channel coincidence and dead time.

  12. 75 FR 71560 - Defense Federal Acquisition Regulation Supplement; Cost and Software Data Reporting System (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 215, 234, 242, and 252... System (DFARS Case 2008-D027) AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD... 1921-2, Progress Curve Report Comment: A respondent noted that DD Form 1921-2 Progress Curve Report...

  13. The JET diagnostic fast central acquisition and trigger system (abstract)

    NASA Astrophysics Data System (ADS)

    Edwards, A. W.; Blackler, K.

    1995-01-01

    Most plasma physics diagnostics sample at a fixed frequency that is normally matched to available memory limits. This technique is not appropriate for long pulse machines such as JET where sampling frequencies of hundreds of kHz are required to diagnose very fast events. As a result of work using real-time event selection within the previous JET soft x-ray diagnostic, a single data acquisition and event triggering system for all suitable fast diagnostics, the fast central acquisition and trigger system (Fast CATS), has been developed for JET. The front-end analog-to-digital conversion (ADC) part samples all channels at 250 kHz, with a 100 kHz pass band and a stop band of 125 kHz. The back-end data collection system is based around Texas Instruments TMS320C40 microprocessors. Within this system, two levels of trigger algorithms are able to evaluate data. The first level typically analyzes data on a per diagnostic and individual channel basis. The second level looks at the data from one or more diagnostics in a window around the time of interest flagged by the first level system. Selection criteria defined by the diagnosticians are then imposed on the results from the second level to decide whether that data should be kept. The use of such a system involving intelligent real time trigger algorithms and fast data analysis will improve both the quantity and quality of JET diagnostic data, while providing valuable input to the design of data acquisition systems for very long pulse machines such as ITER. This paper will give an overview of the various elements of this new system. In addition, first results from this system following the restart of JET operation will be presented.

  14. A distributed data base management system. [for Deep Space Network

    NASA Technical Reports Server (NTRS)

    Bryan, A. I.

    1975-01-01

    Major system design features of a distributed data management system for the NASA Deep Space Network (DSN) designed for continuous two-way deep space communications are described. The reasons for which the distributed data base utilizing third-generation minicomputers is selected as the optimum approach for the DSN are threefold: (1) with a distributed master data base, valid data is available in real-time to support DSN management activities at each location; (2) data base integrity is the responsibility of local management; and (3) the data acquisition/distribution and processing power of a third-generation computer enables the computer to function successfully as a data handler or as an on-line process controller. The concept of the distributed data base is discussed along with the software, data base integrity, and hardware used. The data analysis/update constraint is examined.

  15. OBSANP Data Acquisition System: Operator’s Manual and System Overview

    DTIC Science & Technology

    2013-10-01

    SN  11  –  updated  TCR  from  Arlie  Farlie  during  expedition   52   Figure  28.     Octopus  Wiring  Diagram...Operator’s Manual and System Overview Page 53 of 54 Figure 28. Octopus Wiring Diagram / Neil McPhee (WHOI) WHOI-2013-06 OBSANP Data Acquisition

  16. The research of data acquisition system for Raman spectrometer

    NASA Astrophysics Data System (ADS)

    Cui, Xiao; Guo, Pan; Zhang, Yinchao; Chen, Siying; Chen, He; Chen, Wenbo

    2011-11-01

    Raman spectrometer has been widely used as an identification tool for analyzing material structure and composition in many fields. However, Raman scattering echo signal is very weak, about dozens of photons at most in one laser plus signal. Therefore, it is a great challenge to design a Raman spectrum data acquisition system which could accurately receive the weak echo signal. The system designed in this paper receives optical signals with the principle of photon counter and could detect single photon. The whole system consists of a photoelectric conversion module H7421-40 and a photo counting card including a field programmable gate array (FPGA) chip and a PCI9054 chip. The module H7421-40 including a PMT, an amplifier and a discriminator has high sensitivity on wavelength from 300nm to 720nm. The Center Wavelength is 580nm which is close to the excitation wavelength (532nm), QE 40% at peak wavelength, Count Sensitivity is 7.8*105(S-1PW-1) and Count Linearity is 1.5MHZ. In FPGA chip, the functions are divided into three parts: parameter setting module, controlling module, data collection and storage module. All the commands, parameters and data are transmitted between FPGA and computer by PCI9054 chip through the PCI interface. The result of experiment shows that the Raman spectrum data acquisition system is reasonable and efficient. There are three primary advantages of the data acquisition system: the first one is the high sensitivity with single photon detection capability; the second one is the high integrated level which means all the operation could be done by the photo counting card; and the last one is the high expansion ability because of the smart reconfigurability of FPGA chip.

  17. Purdue ionomics information management system. An integrated functional genomics platform.

    PubMed

    Baxter, Ivan; Ouzzani, Mourad; Orcun, Seza; Kennedy, Brad; Jandhyala, Shrinivas S; Salt, David E

    2007-02-01

    The advent of high-throughput phenotyping technologies has created a deluge of information that is difficult to deal with without the appropriate data management tools. These data management tools should integrate defined workflow controls for genomic-scale data acquisition and validation, data storage and retrieval, and data analysis, indexed around the genomic information of the organism of interest. To maximize the impact of these large datasets, it is critical that they are rapidly disseminated to the broader research community, allowing open access for data mining and discovery. We describe here a system that incorporates such functionalities developed around the Purdue University high-throughput ionomics phenotyping platform. The Purdue Ionomics Information Management System (PiiMS) provides integrated workflow control, data storage, and analysis to facilitate high-throughput data acquisition, along with integrated tools for data search, retrieval, and visualization for hypothesis development. PiiMS is deployed as a World Wide Web-enabled system, allowing for integration of distributed workflow processes and open access to raw data for analysis by numerous laboratories. PiiMS currently contains data on shoot concentrations of P, Ca, K, Mg, Cu, Fe, Zn, Mn, Co, Ni, B, Se, Mo, Na, As, and Cd in over 60,000 shoot tissue samples of Arabidopsis (Arabidopsis thaliana), including ethyl methanesulfonate, fast-neutron and defined T-DNA mutants, and natural accession and populations of recombinant inbred lines from over 800 separate experiments, representing over 1,000,000 fully quantitative elemental concentrations. PiiMS is accessible at www.purdue.edu/dp/ionomics.

  18. Program on Earth Observation Data Management Systems (EODMS), appendixes

    NASA Technical Reports Server (NTRS)

    Eastwood, L. F., Jr.; Gohagan, J. K.; Hill, C. T.; Morgan, R. P.; Bay, S. M.; Foutch, T. K.; Hays, T. R.; Ballard, R. J.; Makin, K. P.; Power, M. A.

    1976-01-01

    The needs of state, regional, and local agencies involved in natural resources management in Illinois, Iowa, Minnesota, Missouri, and Wisconsin are investigated to determine the design of satellite remotely sensed derivable information products. It is concluded that an operational Earth Observation Data Management System (EODMS) will be most beneficial if it provides a full range of services - from raw data acquisition to interpretation and dissemination of final information products. Included is a cost and performance analysis of alternative processing centers, and an assessment of the impacts of policy, regulation, and government structure on implementing large scale use of remote sensing technology in this community of users.

  19. Advanced Self-Calibrating, Self-Repairing Data Acquisition System

    NASA Technical Reports Server (NTRS)

    Medelius, Pedro J. (Inventor); Eckhoff, Anthony J. (Inventor); Angel, Lucena R. (Inventor); Perotti, Jose M. (Inventor)

    2002-01-01

    An improved self-calibrating and self-repairing Data Acquisition System (DAS) for use in inaccessible areas, such as onboard spacecraft, and capable of autonomously performing required system health checks, failure detection. When required, self-repair is implemented utilizing a "spare parts/tool box" system. The available number of spare components primarily depends upon each component's predicted reliability which may be determined using Mean Time Between Failures (MTBF) analysis. Failing or degrading components are electronically removed and disabled to reduce power consumption, before being electronically replaced with spare components.

  20. Design of area array CCD image acquisition and display system based on FPGA

    NASA Astrophysics Data System (ADS)

    Li, Lei; Zhang, Ning; Li, Tianting; Pan, Yue; Dai, Yuming

    2014-09-01

    With the development of science and technology, CCD(Charge-coupled Device) has been widely applied in various fields and plays an important role in the modern sensing system, therefore researching a real-time image acquisition and display plan based on CCD device has great significance. This paper introduces an image data acquisition and display system of area array CCD based on FPGA. Several key technical challenges and problems of the system have also been analyzed and followed solutions put forward .The FPGA works as the core processing unit in the system that controls the integral time sequence .The ICX285AL area array CCD image sensor produced by SONY Corporation has been used in the system. The FPGA works to complete the driver of the area array CCD, then analog front end (AFE) processes the signal of the CCD image, including amplification, filtering, noise elimination, CDS correlation double sampling, etc. AD9945 produced by ADI Corporation to convert analog signal to digital signal. Developed Camera Link high-speed data transmission circuit, and completed the PC-end software design of the image acquisition, and realized the real-time display of images. The result through practical testing indicates that the system in the image acquisition and control is stable and reliable, and the indicators meet the actual project requirements.

  1. An Acquisition Guide for Executives

    EPA Pesticide Factsheets

    This guide covers the following subjects; What is Acquisition?, Purpose and Primary Functions of the Agency’s Acquisition System, Key Organizations in Acquisitions, Legal Framework, Key Players in Acquisitions, Acquisition Process, Acquisition Thresholds

  2. Study and design of cryogenic propellant acquisition systems. Volume 1: Design studies

    NASA Technical Reports Server (NTRS)

    Burge, G. W.; Blackmon, J. B.

    1973-01-01

    An in-depth study and selection of practical propellant surface tension acquisition system designs for two specific future cryogenic space vehicles, an advanced cryogenic space shuttle auxiliary propulsion system and an advanced space propulsion module is reported. A supporting laboratory scale experimental program was also conducted to provide design information critical to concept finalization and selection. Designs using localized pressure isolated surface tension screen devices were selected for each application and preliminary designs were generated. Based on these designs, large scale acquisition prototype hardware was designed and fabricated to be compatible with available NASA-MSFC feed system hardware.

  3. Design of the arm-wrestling robot's force acquisition system based on Qt

    NASA Astrophysics Data System (ADS)

    Huo, Zhixiang; Chen, Feng; Wang, Yongtao

    2017-03-01

    As a collection of entertainment and medical rehabilitation in a robot, the research on the arm-wrestling robot is of great significance. In order to achieve the collection of the arm-wrestling robot's force signals, the design and implementation of arm-wrestling robot's force acquisition system is introduced in this paper. The system is based on MP4221 data acquisition card and is programmed by Qt. It runs successfully in collecting the analog signals on PC. The interface of the system is simple and the real-time performance is good. The result of the test shows the feasibility in arm-wrestling robot.

  4. Miniature infrared data acquisition and telemetry system

    NASA Technical Reports Server (NTRS)

    Stokes, J. H.; Ward, S. M.

    1985-01-01

    The Miniature Infrared Data Acquisition and Telemetry (MIRDAT) Phase 1 study was performed to determine the technical and commercial feasibility of producing a miniaturized electro-optical telemetry system. This system acquires and transmits experimental data from aircraft scale models for realtime monitoring in wind tunnels. During the Phase 1 study, miniature prototype MIRDAT telemetry devices were constructed, successfully tested in the laboratory and delivered to the user for wind tunnel testing. A search was conducted for commercially available components and advanced hybrid techniques to further miniaturize the system during Phase 2 development. A design specification was generated from laboratory testing, user requirements and discussions with component manufacturers. Finally, a preliminary design of the proposed MIRDAT system was documented for Phase 2 development.

  5. Advanced Video Data-Acquisition System For Flight Research

    NASA Technical Reports Server (NTRS)

    Miller, Geoffrey; Richwine, David M.; Hass, Neal E.

    1996-01-01

    Advanced video data-acquisition system (AVDAS) developed to satisfy variety of requirements for in-flight video documentation. Requirements range from providing images for visualization of airflows around fighter airplanes at high angles of attack to obtaining safety-of-flight documentation. F/A-18 AVDAS takes advantage of very capable systems like NITE Hawk forward-looking infrared (FLIR) pod and recent video developments like miniature charge-couple-device (CCD) color video cameras and other flight-qualified video hardware.

  6. An automated library financial management system

    NASA Technical Reports Server (NTRS)

    Dueker, S.; Gustafson, L.

    1977-01-01

    A computerized library acquisition system developed for control of informational materials acquired at NASA Ames Research Center is described. The system monitors the acquisition of both library and individual researchers' orders and supplies detailed financial, statistical, and bibliographical information. Applicability for other libraries and the future availability of the program is discussed.

  7. FASEA: A FPGA Acquisition System and Software Event Analysis for liquid scintillation counting

    NASA Astrophysics Data System (ADS)

    Steele, T.; Mo, L.; Bignell, L.; Smith, M.; Alexiev, D.

    2009-10-01

    The FASEA (FPGA based Acquisition and Software Event Analysis) system has been developed to replace the MAC3 for coincidence pulse processing. The system uses a National Instruments Virtex 5 FPGA card (PXI-7842R) for data acquisition and a purpose developed data analysis software for data analysis. Initial comparisons to the MAC3 unit are included based on measurements of 89Sr and 3H, confirming that the system is able to accurately emulate the behaviour of the MAC3 unit.

  8. Complex multidisciplinary systems decomposition for aerospace vehicle conceptual design and technology acquisition

    NASA Astrophysics Data System (ADS)

    Omoragbon, Amen

    Although, the Aerospace and Defense (A&D) industry is a significant contributor to the United States' economy, national prestige and national security, it experiences significant cost and schedule overruns. This problem is related to the differences between technology acquisition assessments and aerospace vehicle conceptual design. Acquisition assessments evaluate broad sets of alternatives with mostly qualitative techniques, while conceptual design tools evaluate narrow set of alternatives with multidisciplinary tools. In order for these two fields to communicate effectively, a common platform for both concerns is desired. This research is an original contribution to a three-part solution to this problem. It discusses the decomposition step of an innovation technology and sizing tool generation framework. It identifies complex multidisciplinary system definitions as a bridge between acquisition and conceptual design. It establishes complex multidisciplinary building blocks that can be used to build synthesis systems as well as technology portfolios. It also describes a Graphical User Interface Designed to aid in decomposition process. Finally, it demonstrates an application of the methodology to a relevant acquisition and conceptual design problem posed by the US Air Force.

  9. A digital acquisition and elaboration system for nuclear fast pulse detection

    NASA Astrophysics Data System (ADS)

    Esposito, B.; Riva, M.; Marocco, D.; Kaschuck, Y.

    2007-03-01

    A new digital acquisition and elaboration system has been developed and assembled in ENEA-Frascati for the direct sampling of fast pulses from nuclear detectors such as scintillators and diamond detectors. The system is capable of performing the digital sampling of the pulses (200 MSamples/s, 14-bit) and the simultaneous (compressed) data transfer for further storage and software elaboration. The design (FPGA-based) is oriented to real-time applications and has been developed in order to allow acquisition with no loss of pulses and data storage for long-time intervals (tens of s at MHz pulse count rates) without the need of large on-board memory. A dedicated pulse analysis software, written in LabVIEWTM, performs the treatment of the acquired pulses, including pulse recognition, pile-up rejection, baseline removal, pulse shape particle separation and pulse height spectra analysis. The acquisition and pre-elaboration programs have been fully integrated with the analysis software.

  10. Real-time data acquisition of commercial microwave link networks for hydrometeorological applications

    NASA Astrophysics Data System (ADS)

    Chwala, Christian; Keis, Felix; Kunstmann, Harald

    2016-03-01

    The usage of data from commercial microwave link (CML) networks for scientific purposes is becoming increasingly popular, in particular for rain rate estimation. However, data acquisition and availability is still a crucial problem and limits research possibilities. To overcome this issue, we have developed an open-source data acquisition system based on the Simple Network Management Protocol (SNMP). It is able to record transmitted and received signal levels of a large number of CMLs simultaneously with a temporal resolution of up to 1 s. We operate this system at Ericsson Germany, acquiring data from 450 CMLs with minutely real-time transfer to our database. Our data acquisition system is not limited to a particular CML hardware model or manufacturer, though. We demonstrate this by running the same system for CMLs of a different manufacturer, operated by an alpine ski resort in Germany. There, the data acquisition is running simultaneously for four CMLs with a temporal resolution of 1 s. We present an overview of our system, describe the details of the necessary SNMP requests and show results from its operational application.

  11. Real time data acquisition of commercial microwave link networks for hydrometeorological applications

    NASA Astrophysics Data System (ADS)

    Chwala, C.; Keis, F.; Kunstmann, H.

    2015-11-01

    The usage of data from commercial microwave link (CML) networks for scientific purposes is becoming increasingly popular, in particular for rain rate estimation. However, data acquisition and availability is still a crucial problem and limits research possibilities. To overcome this issue, we have developed an open source data acquisition system based on the Simple Network Management Protocol (SNMP). It is able to record transmitted- and received signal levels of a large number of CMLs simultaneously with a temporal resolution of up to one second. We operate this system at Ericsson Germany, acquiring data from 450 CMLs with minutely real time transfer to our data base. Our data acquisition system is not limited to a particular CML hardware model or manufacturer, though. We demonstrate this by running the same system for CMLs of a different manufacturer, operated by an alpine skiing resort in Germany. There, the data acquisition is running simultaneously for four CMLs with a temporal resolution of one second. We present an overview of our system, describe the details of the necessary SNMP requests and show results from its operational application.

  12. Multiple channel optical data acquisition system

    DOEpatents

    Fasching, G.E.; Goff, D.R.

    1985-02-22

    A multiple channel optical data acquisition system is provided in which a plurality of remote sensors monitoring specific process variable are interrogated by means of a single optical fiber connecting the remote station/sensors to a base station. The remote station/sensors derive all power from light transmitted through the fiber from the base station. Each station/sensor is individually accessed by means of a light modulated address code sent over the fiber. The remote station/sensors use a single light emitting diode to both send and receive light signals to communicate with the base station and provide power for the remote station. The system described can power at least 100 remote station/sensors over an optical fiber one mile in length.

  13. 75 FR 51416 - Defense Federal Acquisition Regulation Supplement; Acquisition of Commercial Items

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... be used for the acquisition of commercial items, and revised the language to address the conditions... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 202, 212, and 234 [DFARS Case 2008-D011] Defense Federal Acquisition Regulation Supplement; Acquisition of Commercial Items...

  14. Two Axis Pointing System (TAPS) attitude acquisition, determination, and control

    NASA Technical Reports Server (NTRS)

    Azzolini, John D.; Mcglew, David E.

    1990-01-01

    The Two Axis Pointing System (TAPS) is a 2 axis gimbal system designed to provide fine pointing of Space Transportation System (STS) borne instruments. It features center-of-mass instrument mounting and will accommodate instruments of up to 1134 kg (2500 pounds) which fit within a 1.0 by 1.0 by 4.2 meter (40 by 40 by 166 inch) envelope. The TAPS system is controlled by a microcomputer based Control Electronics Assembly (CEA), a Power Distribution Unit (PDU), and a Servo Control Unit (SCU). A DRIRU-II inertial reference unit is used to provide incremental angles for attitude propagation. A Ball Brothers STRAP star tracker is used for attitude acquisition and update. The theory of the TAPS attitude determination and error computation for the Broad Band X-ray Telescope (BBXRT) are described. The attitude acquisition is based upon a 2 star geometric solution. The acquisition theory and quaternion algebra are presented. The attitude control combines classical position, integral and derivative (PID) control with techniques to compensate for coulomb friction (bias torque) and the cable harness crossing the gimbals (spring torque). Also presented is a technique for an adaptive bias torque compensation which adjusts to an ever changing frictional torque environment. The control stability margins are detailed, with the predicted pointing performance, based upon simulation studies. The TAPS user interface, which provides high level operations commands to facilitate science observations, is outlined.

  15. The DISTO data acquisition system at SATURNE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Balestra, F.; Bedfer, Y.; Bertini, R.

    1998-06-01

    The DISTO collaboration has built a large-acceptance magnetic spectrometer designed to provide broad kinematic coverage of multiparticle final states produced in pp scattering. The spectrometer has been installed in the polarized proton beam of the Saturne accelerator in Saclay to study polarization observables in the {rvec p}p {yields} pK{sup +}{rvec Y} (Y = {Lambda}, {Sigma}{sup 0} or Y{sup *}) reaction and vector meson production ({psi}, {omega} and {rho}) in pp collisions. The data acquisition system is based on a VME 68030 CPU running the OS/9 operating system, housed in a single VME crate together with the CAMAC interface, the triplemore » port ECL memories, and four RISC R3000 CPU. The digitization of signals from the detectors is made by PCOS III and FERA front-end electronics. Data of several events belonging to a single Saturne extraction are stored in VME triple-port ECL memories using a hardwired fast sequencer. The buffer, optionally filtered by the RISC R3000 CPU, is recorded on a DLT cassette by DAQ CPU using the on-board SCSI interface during the acceleration cycle. Two UNIX workstations are connected to the VME CPUs through a fast parallel bus and the Local Area Network. They analyze a subset of events for on-line monitoring. The data acquisition system is able to read and record 3,500 ev/burst in the present configuration with a dead time of 15%.« less

  16. Navy Acquisition. SUBACS (Submarine Advanced Combat System) Problems May Adversely Affect Navy Attack Submarine Programs.

    DTIC Science & Technology

    1985-11-01

    also the combat system design for the proposed new attack submarine class, SSN 21. In December 1983, the Navy awarded the International Business Machines...VI: Comments From International Business 35 Machines Corporation Abbreviations DNSARC Department of the Navy Systems Acquisition Review Council DSARC...Defense Systems Acquisition Review Council GAO General Accounting Office IBM International Business Machines Corporation NAVsEA Naval Sea Systems

  17. Ocean Data Acquisition System

    NASA Technical Reports Server (NTRS)

    Johnson, B.; Cavanaugh, J.; Smith, J.; Esaias, W.

    1988-01-01

    The Ocean Data Acquisition System (ODAS) is a low cost instrument with potential commercial application. It is easily mounted on a small aircraft and flown over the coastal zone ocean to remotely measure sea surface temperature and three channels of ocean color information. From this data, chlorophyll levels can be derived for use by ocean scientists, fisheries, and environmental offices. Data can be transmitted to shipboard for real-time use with sea truth measurements, ocean productivity estimates and fishing fleet direction. The aircraft portion of the system has two primary instruments: an IR radiometer to measure sea surface temperature and a three channel visible spectro-radiometer for 460, 490, and 520 nm wavelength measurements from which chlorophyll concentration can be derived. The aircraft package contains a LORAN-C unit for aircraft location information, clock, on-board data processor and formatter, digital data storage, packet radio terminal controller, and radio transceiver for data transmission to a ship. The shipboard package contains a transceiver, packet terminal controller, data processing and storage capability, and printer. Both raw data and chlorophyll concentrations are available for real-time analysis.

  18. Data acquisition system for segmented reactor antineutrino detector

    NASA Astrophysics Data System (ADS)

    Hons, Z.; Vlášek, J.

    2017-01-01

    This paper describes the data acquisition system used for data readout from the PMT channels of a segmented detector of reactor antineutrinos with active shielding. Theoretical approach to the data acquisition is described and two possible solutions using QDCs and digitizers are discussed. Also described are the results of the DAQ performance during routine data taking operation of DANSS. DANSS (Detector of the reactor AntiNeutrino based on Solid Scintillator) is a project aiming to measure a spectrum of reactor antineutrinos using inverse beta decay (IBD) in a plastic scintillator. The detector is located close to an industrial nuclear reactor core and is covered by passive and active shielding. It is expected to have about 15000 IBD interactions per day. Light from the detector is sensed by PMT and SiPM.

  19. Achieving Better Buying Power through Acquisition of Open Architecture Software Systems for Web and Mobile Devices

    DTIC Science & Technology

    2016-02-22

    SPONSORED REPORT SERIES Achieving Better Buying Power through Acquisition of Open Architecture Software Systems for Web and Mobile Devices 22...ACQUISITION RESEARCH PROGRAM SPONSORED REPORT SERIES Achieving Better Buying Power through Acquisition of Open Architecture Software Systems for Web ...Policy Naval Postgraduate School Executive Summary Many people within large enterprises rely on up to four Web -based or mobile devices for their

  20. AdaNET Dynamic Software Inventory (DSI) prototype component acquisition plan

    NASA Technical Reports Server (NTRS)

    Hanley, Lionel

    1989-01-01

    A component acquisition plan contains the information needed to evaluate, select, and acquire software and hardware components necessary for successful completion of the AdaNET Dynamic Software Inventory (DSI) Management System Prototype. This plan will evolve and be applicable to all phases of the DSI prototype development. Resources, budgets, schedules, and organizations related to component acquisition activities are provided. A purpose and description of a software or hardware component which is to be acquired are presented. Since this is a plan for acquisition of all components, this section is not applicable. The procurement activities and events conducted by the acquirer are described and who is responsible is identified, where the activity will be performed, and when the activities will occur for each planned procurement. Acquisition requirements describe the specific requirements and standards to be followed during component acquisition. The activities which will take place during component acquisition are described. A list of abbreviations and acronyms, and a glossary are contained.