Science.gov

Sample records for acquisition planning contractor

  1. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    SciTech Connect

    MERCADO, L.C.

    2000-04-22

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects.

  2. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Contractor acquisition of information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002...

  3. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating...

  4. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating...

  5. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating...

  6. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating...

  7. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Energy Acquisition Regulation (DEAR) (76 FR 81408). The comment period is reopened until March 16, 2012... published a NOPR in the Federal Register (76 FR 81408) to revise existing regulations covering contractor... Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal Management Requirements;...

  8. Technical Assistance Contractor management plan. Revision 1

    SciTech Connect

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  9. Guideline for the preparation of a contractor safety plan

    SciTech Connect

    Stinnett, L

    1982-04-01

    This document is only a guideline for contractors to use in formalizing a safety program or preparing a safety plan. It contains a format of a suggested safety plan as well as pertinent safety elements which should be considered for inclusion. However, consideration of only those items listed may not be sufficient. Each contractor should include in the safety plan particular reference to those elements peculiar to the inherent hazards of the contractor's specific type of construction services, whether the hazard is shown in the list of safety elements or not. Each safety plan should be reviewed annually by the contractor's management. Reissue of the safety plan is mandatory if safety requirements have changed, or if the contractor's address or management (approval signature) has changed.

  10. Contractor relationships and inter-organizational strategies in NASA's R and D acquisition process

    NASA Technical Reports Server (NTRS)

    Guiltinan, J.

    1976-01-01

    Interorganizational analysis of NASA's acquisition process for research and development systems is discussed. The importance of understanding the contractor environment, constraints, and motives in selecting an acquisition strategy is demonstrated. By articulating clear project goals, by utilizing information about the contractor and his needs at each stage in the acquisition process, and by thorough analysis of the inter-organizational relationship, improved selection of acquisition strategies and business practices is possible.

  11. 75 FR 33237 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... Acquisition Regulation Supplement (DFARS) Case 2003-D050, published at 71 FR 9273, February 23, 2006, moved...; Contractor Insurance/Pension Review (DFARS Case 2009-D025) AGENCY: Defense Acquisition Regulations System... and relocate the requirements for conducting a Contractor Insurance/Pension Review from...

  12. Human Resources Staffing Plan for the Tank Farm Contractor

    SciTech Connect

    BOSLEY, J.W.

    2000-04-22

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline.

  13. UMTRA project technical assistance contractor quality assurance implementation plan

    SciTech Connect

    Not Available

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

  14. 78 FR 48123 - Federal Acquisition Regulation; Contractor Comment Period, Past Performance Evaluations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... response to the past performance evaluation, contractors will have a maximum of 14 days to do so. In... GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 48 CFR Part 42 RIN 9000-AM40 Federal Acquisition Regulation; Contractor Comment Period, Past Performance Evaluations AGENCY:...

  15. 75 FR 28771 - Federal Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-24

    ...: 9000-AL60 Federal Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of... over contractor CACs. A CAC is the DoD term for a Personal Identity Verification (PIV) card. A PIV card....204-9, Personal Identity Verification of Contractor Personnel to be consistent with Part 4. This...

  16. 75 FR 66680 - Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ...DoD is adopting as final, with changes, the interim rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to add policy and a contract clause requiring that contractors providing essential contractor services, as determined by the requiring activity, shall be prepared to continue such services during periods of...

  17. 48 CFR 873.105 - Acquisition planning.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Acquisition planning. 873.105 Section 873.105 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS DEPARTMENT SUPPLEMENTARY REGULATIONS SIMPLIFIED ACQUISITION PROCEDURES FOR HEALTH-CARE RESOURCES 873.105 Acquisition planning. (a) Acquisition planning is...

  18. Technical assistance contractor Management Plan. Final [report

    SciTech Connect

    Not Available

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  19. Configuration Management Plan for the Tank Farm Contractor

    SciTech Connect

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  20. 76 FR 48776 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... comment period for the proposed rule published June, 28, 2011, at 76 FR 37704, is extended. Comments will... proposed rule for Documenting Contractor Performance (75 FR 37704) and extends the comment closing date by...) and 42.1503(h)(1) in the proposed rule. Correction In the proposed rule FR Doc. 2011-16169,...

  1. 77 FR 51496 - Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... Acquisition Regulation (FAR) to protect against the compromise of contractor computer networks on which... public meeting in the Federal Register at 75 FR 9563 on March 3, 2010, under Defense Federal Acquisition... 75 FR 68675, on November 9, 2010. Further, the clause prescribed in the proposed rule is not...

  2. 48 CFR 1509.170-8 - Contractor Performance Report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance Report. 1509.170-8 Section 1509.170-8 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a)...

  3. 78 FR 29247 - Contractor Legal Management Requirements; Acquisition Regulations; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... correcting a final rule that appeared in the Federal Register of May 3, 2013 (78 FR 25795). In this document.... Telephone: (202) 287-5746. Email: eric.mulch@hq.doe.gov . SUPPLEMENTARY INFORMATION: In FR Doc. 2013-10485..., on May 14, 2013. Paul Bosco, Director, Office of Acquisition and Project Management. BILLING...

  4. 76 FR 81408 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ...) Routine intellectual property law support services; and (c) Routine workers and unemployment compensation... Register (59 FR 44981). The interim Acquisition Letter was finalized as a Policy Statement on April 3, 1996 (61 FR 14763). This Policy Statement was followed by a formal rulemaking which added part...

  5. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Federal Register on August 31, 1994 (59 FR 44981). The interim Acquisition Letter was finalized as a Policy Statement on April 3, 1996 (61 FR 14763). This Policy Statement was followed by a formal... Regulations with an effective date of April 23, 2001 (66 FR 4616, 66 FR 19717). After a decade operating...

  6. 75 FR 71564 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... proposed rule at 75 FR 33237 on June 11, 2010, and the public comment period closed on August 10, 2010. No... Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025) AGENCY: Defense Acquisition.../Pension Review from Procedures, Guidance, and Information (PGI) to the Defense Federal...

  7. 75 FR 60264 - Federal Acquisition Regulation; Encouraging Contractor Policies To Ban Text Messaging While Driving

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ..., 2009 (74 FR 51225, October 6, 2009), entitled ``Federal Leadership on Reducing Text Messaging while..., dated October 1, 2009 (74 FR 51225, October 6, 2009), Federal Leadership on Reducing Text Messaging... 9000-AL64 Federal Acquisition Regulation; Encouraging Contractor Policies To Ban Text Messaging...

  8. UMTRA technical assistance contractor quality assurance program plan

    SciTech Connect

    Not Available

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements.

  9. UMTRA technical assistance contractor Quality Assurance Program Plan. Revision 4

    SciTech Connect

    Pehrson, P.

    1993-10-12

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation.

  10. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... contractors have implemented the mandatory contractor business ethics program requirements. DATES: Effective... FAR 52.203-13, Contractor Code of Business Ethics and Conduct. This final rule modifies FAR 42.302... ensure that contractors have implemented the mandatory contractor business ethics program requirements...

  11. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... Regulation; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of...

  12. 76 FR 37353 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Business Ethics Compliance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-27

    ... Regulation; Submission for OMB Review; Contractor Business Ethics Compliance Program and Disclosure... requirement concerning contractor business ethics compliance program and disclosure requirements. Public... Information Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure...

  13. Teacher Trainees' Information Acquisition in Lesson Planning

    ERIC Educational Resources Information Center

    Tanni, Mikko

    2012-01-01

    Introduction: Few studies have addressed teacher trainees' information acquisition in the context of a task. The paper reports findings from an empirical study on teacher trainees' use of information (seeking) channels and sources, and their modes of information acquisition in lesson planning. Method: Semi-structured (retrospectively held)…

  14. Technical assistance contractor management plan: Surface and ground water

    SciTech Connect

    Not Available

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

  15. National Ignition Facility project acquisition plan

    SciTech Connect

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

  16. 78 FR 60169 - Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... exactly the same as, the current FAR contractor whistleblower coverage. These are addressed in the policy... the American Recovery and Reinvestment Act of 2009 (see 3.907), the current protections for contractor... language of the workforce. The interim rule applies the pilot to purchases of commercial items...

  17. 77 FR 70780 - Federal Acquisition Regulation; Submission for OMB Review; Contractors Performing Private...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... Security Functions Outside the United States. A notice was published in the Federal Register at 77 FR 43039... Regulation; Submission for OMB Review; Contractors Performing Private Security Functions Outside the United... 9000-0184, Contractors Performing Private Security Functions Outside the United States''. Follow...

  18. 48 CFR 3009.171-7 - Contract award approval procedures for contractors with felony convictions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Contract award approval procedures for contractors with felony convictions. 3009.171-7 Section 3009.171-7 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR...

  19. 48 CFR 907.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contents of written acquisition plans. 907.105 Section 907.105 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... acquisition plans. (b)(16) Environmental and energy conservation objectives. Incorporate sustainable...

  20. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    SciTech Connect

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  1. 78 FR 59851 - Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... Defense Acquisition Regulations System 48 CFR Parts 203 and 252 RIN 0750-AH97 Defense Federal Acquisition...) AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Interim rule. SUMMARY: DoD is issuing an interim rule amending the Defense Federal Acquisition Regulation...

  2. 78 FR 6189 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... NASA published a proposed rule in the Federal Register at 77 FR 10461 implementing the prohibition... Procurement Agreement (GPA) and other Free Trade Agreements (FTAs) identified under FAR part 25. Response: The... GPA. Will the 2 percent excise tax be applied to Turkish contractors? (b) The rule is considered to...

  3. 78 FR 69282 - Defense Federal Acquisition Regulation Supplement: Removal of DFARS Coverage on Contractors...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... 78 FR 37670). Therefore, there is no need to retain the duplicative DFARS coverage applicable solely... ``Contractors Performing Private Security Functions.'' The DFARS interim rule was published at 76 FR 52133, effective August 19, 2011, and the final rule was published at 77 FR 35883 on June 15, 2012. These...

  4. 78 FR 65244 - Defense Federal Acquisition Regulation Supplement: Contractor Personnel Supporting U.S. Armed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... immunizations as specified in the contract. During predeployment processing, the Government will provide, at no cost to the Contractor, any military- specific immunizations and/or medications not available to the general public. All other immunizations must be obtained prior to arrival at the deployment center....

  5. 78 FR 64499 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... management system vehicles. A notice was published in the Federal Register at 78 FR 23935, on April 23, 2013... Register on March 5, 2010 (75 FR 10267). No public comments were received in prior years that have... Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles...

  6. 77 FR 51783 - Federal Acquisition Regulation; Information Collection; Contractors' Purchasing Systems Reviews

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ...Under the provisions of the Paperwork Reduction Act, the Regulatory Secretariat will be submitting to the Office of Management and Budget (OMB) a request to review and approve an extension of a previously approved information collection requirement concerning contractors' purchasing systems reviews. Public comments are particularly invited on: Whether this collection of information is......

  7. 78 FR 17673 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... notice was published in the Federal Register at 77 FR 51783, on October 27, 2012. One comment was... submitting to the Office of Management and Budget (OMB) a request to review and approve an extension of a.... For example, the Defense Contract Management Agency (DCMA) Contractor Purchasing System Review...

  8. 48 CFR 873.105 - Acquisition planning.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... equipment or space, where the acquisition is expected to exceed the simplified acquisition threshold (SAT... particular acquisition expected to exceed the SAT. The team should consist of a mix of staff, appropriate...

  9. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Criteria for recognizing contractor organizational conflicts of interest. 2009.570-3 Section 2009.570-3 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of...

  10. National Ignition Facility project acquisition plan revision 1

    SciTech Connect

    Clobes, A.R.

    1996-10-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  11. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    SciTech Connect

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements.

  12. 77 FR 50449 - Revision of Department of Homeland Security Acquisition Regulation; Contractor Billing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... contracts and orders that exceed the Simplified Acquisition Threshold (SAT). The purpose of this procedure... of the rule or to apply the rule to all actions, rather than applying it only to actions over the SAT... to actions under the SAT was rejected because the benefits would likely not be substantial...

  13. 78 FR 33994 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... May 22, 2013 (78 FR 30233) in the amendatory language, correct the following: 252.212-7001 0 1. On...; correction. SUMMARY: This document corrects the amendatory language to a final rule published in the Federal Register on May 22, 2013, 78 FR 30233, regarding the Defense Federal Acquisition Regulation...

  14. 77 FR 43039 - Federal Acquisition Regulation; Contractors Performing Private Security Functions Outside the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ...The DoD, GSA, and NASA are proposing to amend the Federal Acquisition Regulation (FAR) to implement Governmentwide requirements in National Defense Authorization Acts that establish minimum processes and requirements for the selection, accountability, training, equipping, and conduct of personnel performing private security functions outside the United...

  15. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    SciTech Connect

    Not Available

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements.

  16. Greening the Department of Energy through waste prevention, recycling, and Federal acquisition. Strategic plan to implement Executive Order 13101

    SciTech Connect

    2000-11-01

    This Plan provides strategies and milestones to implement Executive Order 13101, Greening the Government Through Waste Prevention, Recycling, and Federal Acquisition, and to achieve the new Secretarial goals for 2005 and 2010. It serves as the principal Secretarial guidance to Department of Energy (DOE) Headquarters, Field Offices, and laboratory and contractor staff to improve sanitary waste prevention, recycling, and the purchase and use of recycled content and environmentally preferable products and services in the DOE.

  17. Planning and Acquisition Problems for a Growing University.

    ERIC Educational Resources Information Center

    Learn, Elmer W.

    Some tentative conclusions based on an urban university community planning program deal with the characteristics of university communities, special problems engendered by these characteristics, and methods to combat them. The problems discussed center around planning, land acquisition, zoning and community relations. (HH)

  18. AZ-101 Mixer Pump Demonstration Data Acquisition System and Gamma Cart Data Acquisition Control System Software Configuration Management Plan

    SciTech Connect

    WHITE, D.A.

    1999-12-29

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the AZ1101 Mixer Pump Demonstration Data Acquisition System (DAS) and the Sludge Mobilization Cart (Gamma Cart) Data Acquisition and Control System (DACS).

  19. Tank farm instrumentation and data acquisition/management upgrade plan

    SciTech Connect

    Scaief, C.C. III

    1994-09-13

    This plan provides the strategy, implementation, and schedule for upgrading tank farm instrumentation, data acquisition and data management. The focus is on surveillance parameters to verify and maintain tank safety. The criteria do not necessarily constitute mandatory requirements but are based upon engineering judgement and best available information. Schedules reflect preliminary funding for FY95. For out years they are best engineering judgment.

  20. 48 CFR 1909.404 - Consolidated list of debarred, suspended, and ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... System BROADCASTING BOARD OF GOVERNORS ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment.... (a) The Policy and Procedures Staff, Office of Contracts, shall be responsible for the maintenance... Procedures Staff, Office of Contracts, of their distribution needs and shall ensure the list is...

  1. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 45.105 Contractors' property management... the contractor's property management policies, procedures, practices, and systems. This analysis shall... property administrator shall notify the contractor in writing when the contractor's property...

  2. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 45.105 Contractors' property management... the contractor's property management policies, procedures, practices, and systems. This analysis shall... property administrator shall notify the contractor in writing when the contractor's property...

  3. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 45.105 Contractors' property management... the contractor's property management policies, procedures, practices, and systems. This analysis shall... property administrator shall notify the contractor in writing when the contractor's property...

  4. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 45.105 Contractors' property management... the contractor's property management policies, procedures, practices, and systems. This analysis shall... property administrator shall notify the contractor in writing when the contractor's property...

  5. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 45.105 Contractors' property management... the contractor's property management policies, procedures, practices, and systems. This analysis shall... property administrator shall notify the contractor in writing when the contractor's property...

  6. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contractor responsibilities. 46.105 Section 46.105 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations...

  7. Satellite land use acquisition and applications to hydrologic planning models

    NASA Technical Reports Server (NTRS)

    Algazi, V. R.; Suk, M.

    1977-01-01

    A developing operational procedure for use by the Corps of Engineers in the acquisition of land use information for hydrologic planning purposes was described. The operational conditions preclude the use of dedicated, interactive image processing facilities. Given the constraints, an approach to land use classification based on clustering seems promising and was explored in detail. The procedure is outlined and examples of application to two watersheds given.

  8. Image acquisition planning for the CHRIS sensor onboard PROBA

    NASA Astrophysics Data System (ADS)

    Fletcher, Peter A.

    2004-10-01

    The CHRIS (Compact High Resolution Imaging Spectrometer) instrument was launched onboard the European Space Agency (ESA) PROBA satellite on 22 October 2001. CHRIS can acquire up to 63 bands of hyperspectral data at a ground spatial resolution of 36m. Alternatively, the instrument can be configured to acquire 18 bands of data with a spatial resolution of 17m. PROBA, by virtue of its agile pointing capability, enables CHRIS to acquire five different angle images of the selected site. Two sites can be acquired every 24 hours. The hyperspectral and multi-angle capability of CHRIS makes it an important resource for stydying BRDF phenomena of vegetation. Other applications include coastal and inland waters, wild fires, education and public relations. An effective data acquisition planning procedure has been implemented and since mid-2002 users have been receiving data for analysis. A cloud prediction routine has been adopted that maximises the image acquisition capacity of CHRIS-PROBA. Image acquisition planning is carried out by RSAC Ltd on behalf of ESA and in co-operation with Sira Technology Ltd and Redu, the ESA ground station in Belgium, responsible for CHRIS-PROBA.

  9. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    SciTech Connect

    KIRKBRIDE, R.A.

    2000-04-19

    This document updates the operating scenario and plans for feed delivery to BNFL Inc. of retrieval and waste from single-shell tanks, and the overall process flowsheets for Phases 1 and 2 of the River Protection Project. The plans and flowsheets are updated with the most recent guidance from ORP and tank-by-tank inventory. The results provide the technical basis for the RTP-2 planning effort. Sensitivity cases were run to evaluate the effect of changes on key parameters.

  10. Acquisition of background and technical information and class trip planning

    NASA Technical Reports Server (NTRS)

    Mackinnon, R. M.; Wake, W. H.

    1981-01-01

    Instructors who are very familiar with a study area, as well as those who are not, find the field trip information acquisition and planning process speeded and made more effective by organizing it in stages. The stage follow a deductive progression: from the associated context region, to the study area, to the specific sample window sites, and from generalized background information on the study region to specific technical data on the environmental and human use systems to be interpreted at each site. On the class trip and in the follow up laboratory, the learning/interpretive process are at first deductive in applying previously learned information and skills to analysis of the study site, then inductive in reading and interpreting the landscape, imagery, and maps of the site, correlating them with information of other samples sites and building valid generalizations about the larger study area, its context region, and other (similar and/or contrasting) regions.

  11. 48 CFR 3409.570 - Certification at or below the simplified acquisition threshold.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS... circumstances that would give rise to an organizational conflict of interest, as defined in FAR subpart 2.1, or... actual or potential organizational conflict of interest is discovered after award, the contractor...

  12. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    SciTech Connect

    KIRKBRIDE, R.A.

    1999-05-04

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.

  13. 48 CFR 253.209 - Contractor qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications....

  14. 48 CFR 253.209 - Contractor qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications....

  15. 48 CFR 253.209 - Contractor qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications....

  16. 48 CFR 253.209 - Contractor qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications....

  17. AdaNET Dynamic Software Inventory (DSI) prototype component acquisition plan

    NASA Technical Reports Server (NTRS)

    Hanley, Lionel

    1989-01-01

    A component acquisition plan contains the information needed to evaluate, select, and acquire software and hardware components necessary for successful completion of the AdaNET Dynamic Software Inventory (DSI) Management System Prototype. This plan will evolve and be applicable to all phases of the DSI prototype development. Resources, budgets, schedules, and organizations related to component acquisition activities are provided. A purpose and description of a software or hardware component which is to be acquired are presented. Since this is a plan for acquisition of all components, this section is not applicable. The procurement activities and events conducted by the acquirer are described and who is responsible is identified, where the activity will be performed, and when the activities will occur for each planned procurement. Acquisition requirements describe the specific requirements and standards to be followed during component acquisition. The activities which will take place during component acquisition are described. A list of abbreviations and acronyms, and a glossary are contained.

  18. 48 CFR 1845.7210 - Contractor utilization of Government property.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor utilization of Government property. 1845.7210 Section 1845.7210 Federal Acquisition Regulations System NATIONAL AERONAUTICS....7210 Contractor utilization of Government property....

  19. Quality assurance project plan for the UMTRA technical assistance contractor hydrochemistry facility. Final report

    SciTech Connect

    1993-07-01

    The Uranium Mill Tailings Remedial Action (UMTRA) hydrochemistry facility is used to perform a limited but important set of services for the UMTRA Project. Routine services include support of field-based hydrological and geochemical operations and water sampling activities. Less commonly, the hydrology and geochemistry staff undertake special studies and site characterization studies at this facility. It is also used to train hydrologists, geochemists, and groundwater sampling crews. A review of this Quality Assurance Project Plan (QAPP) shall be accomplished once each calendar year. This review will be targeted to be accomplished not sooner than 6 months and not later than 18 months after the last review.

  20. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAMS ENVIRONMENT, CONSERVATION, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition... sustainable products and services by its facility support contractors. The DOE Sustainable Acquisition...

  1. 48 CFR 245.608 - Screening of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory....

  2. A geostationary longitude acquisition planning algorithm. [for maneuver planning of geosynchronous satellites

    NASA Technical Reports Server (NTRS)

    Petruzzo, C. J.; Bryant, W. C., Jr.; Nickerson, K. G.

    1977-01-01

    The paper is concerned with the phase of the geosynchronous mission termed station acquisition, which involves the maneuvering of a spacecraft to its geostationary longitude by means of the spacecraft propulsion system. An algorithm which assists in maneuver planning is described, and examples of its use are presented. The algorithm can be applied when sequences of more than three maneuvers are to be expected. While, in general, three maneuvers are sufficient to achieve the desired end conditions when orbital mechanics are the only consideration, operational considerations may add constraints resulting in an increased number of maneuvers required.

  3. 48 CFR 7.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... small business concerns. (iii) For information technology acquisitions using Internet Protocol, discuss... 16.505(a)(3)). (ii) For each order contemplated, discuss— (A) For information technology acquisitions... will be established, maintained, and monitored (see Subpart 4.4). For information...

  4. 48 CFR 7.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... small business concerns. (iii) For information technology acquisitions using Internet Protocol, discuss... 16.505(a)(3)). (ii) For each order contemplated, discuss— (A) For information technology acquisitions... will be established, maintained, and monitored (see Subpart 4.4). For information...

  5. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Status of contractors as a direct contractor (Spain). 252.229-7004 Section 252.229-7004 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions...

  6. Knowledge Acquisition, Validation, and Maintenance in a Planning System for Automated Image Processing

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.

    1996-01-01

    A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintainting the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems. This paper describes a planning application of automated imaging processing and our overall approach to knowledge acquisition for this application.

  7. 48 CFR 52.247-28 - Contractor's Invoices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed...

  8. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree...

  9. 48 CFR 1252.242-71 - Contractor testimony.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony....

  10. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree...

  11. Contractor Relationships.

    ERIC Educational Resources Information Center

    Miller, Anthony R.

    1989-01-01

    It is an advantage to a school system to contract for its school bus service. Financially, private companies can obtain capital easier than can public agencies. A school system that uses good management and monitors the contractor with clear specifications can be assured of safety and efficiency. (MLF)

  12. Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.

  13. 48 CFR 18.102 - Central contractor registration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... registration. 18.102 Section 18.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Central contractor registration. Contractors are not required to be registered in the Central Contractor Registration (CCR) for contracts awarded to support unusual and compelling needs or emergency...

  14. 48 CFR 18.102 - Central contractor registration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... registration. 18.102 Section 18.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Central contractor registration. Contractors are not required to be registered in the Central Contractor Registration (CCR) for contracts awarded to support unusual and compelling needs or emergency...

  15. 48 CFR 645.608 - Screening of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... inventory. 645.608 Section 645.608 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 645.608 Screening of contractor inventory....

  16. Acquisition Planning, Ethnic Discourse, and the Ecuadorian Nation-State.

    ERIC Educational Resources Information Center

    King, Kendall

    1994-01-01

    This paper examines the language planning efforts of the government of Ecuador and groups representing the indigenous peoples of the country. Government sanctioned policy and practice, as well as the grassroots efforts of the Indian population, both aim to influence language behavior and both have ultimately been directed at social and political…

  17. Acquisition Policy Planning and Litigation: Language Planning in the Context of "Y.S. v. District of Philadelphia."

    ERIC Educational Resources Information Center

    Skilton, Ellen E.

    1992-01-01

    This paper discusses language policy and educational practice in the context of a class action law suit filed on behalf of Asian students in Philadelphia concerning their linguistic and academic needs. It addresses both macro and micro perspectives in its discussion of litigation policy, acquisition policy planning, and Asian Americans in the…

  18. 48 CFR 45.502 - Subcontractor and alternate prime contractor locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... alternate prime contractor locations. 45.502 Section 45.502 Federal Acquisition Regulations System FEDERAL....502 Subcontractor and alternate prime contractor locations. (a) To ensure subcontractor compliance with Government property administration requirements, and with prime contractor consent, the...

  19. 48 CFR 45.502 - Subcontractor and alternate prime contractor locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... alternate prime contractor locations. 45.502 Section 45.502 Federal Acquisition Regulations System FEDERAL....502 Subcontractor and alternate prime contractor locations. (a) To ensure subcontractor compliance with Government property administration requirements, and with prime contractor consent, the...

  20. Acquisition of business intelligence from human experience in route planning

    NASA Astrophysics Data System (ADS)

    Bello Orgaz, Gema; Barrero, David F.; R-Moreno, María D.; Camacho, David

    2015-04-01

    The logistic sector raises a number of highly challenging problems. Probably one of the most important ones is the shipping planning, i.e. plan the routes that the shippers have to follow to deliver the goods. In this article, we present an artificial intelligence-based solution that has been designed to help a logistic company to improve its routes planning process. In order to achieve this goal, the solution uses the knowledge acquired by the company drivers to propose optimised routes. Hence, the proposed solution gathers the experience of the drivers, processes it and optimises the delivery process. The solution uses data mining to extract knowledge from the company information systems and prepares it for analysis with a case-based reasoning (CBR) algorithm. The CBR obtains critical business intelligence knowledge from the drivers experience that is needed by the planner. The design of the routes is done by a genetic algorithm that, given the processed information, optimises the routes following several objectives, such as minimise the distance or time. Experimentation shows that the proposed approach is able to find routes that improve, on average, the routes made by the human experts.

  1. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Contractor responsibilities. 46.105 Section 46.105 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION...— (1) Manufacturing processes, to ensure that the product is produced to, and meets, the...

  2. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Contractor responsibilities. 46.105 Section 46.105 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION...— (1) Manufacturing processes, to ensure that the product is produced to, and meets, the...

  3. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Contractor responsibilities. 46.105 Section 46.105 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION...— (1) Manufacturing processes, to ensure that the product is produced to, and meets, the...

  4. 48 CFR 36.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION...

  5. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance Evaluation. 8.406-7 Section 8.406-7 Federal Acquisition Regulations System FEDERAL ACQUISITION...

  6. 48 CFR 1646.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 1646.301 Contractor...

  7. 48 CFR 2427.305-2 - Follow-up by contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Follow-up by contractor. 2427.305-2 Section 2427.305-2 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to...

  8. 48 CFR 2427.305-2 - Follow-up by contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor. 2427.305-2 Section 2427.305-2 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to...

  9. 48 CFR 2427.305-2 - Follow-up by contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Follow-up by contractor. 2427.305-2 Section 2427.305-2 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to...

  10. 48 CFR 725.703 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-financed contract, except that they must be citizens of a Geographic Code 935 country, or non-U.S. citizens... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees....

  11. 48 CFR 725.703 - Contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... the contract is awarded to a U.S. firm, at least half of the supervisors, and any other specified...

  12. 48 CFR 3009.570 - Limitations on contractors acting as lead system integrators.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Limitations on contractors acting as lead system integrators. 3009.570 Section 3009.570 Federal Acquisition Regulations System... contractors acting as lead system integrators....

  13. 48 CFR 3009.570 - Limitations on contractors acting as lead system integrators.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Limitations on contractors acting as lead system integrators. 3009.570 Section 3009.570 Federal Acquisition Regulations System... contractors acting as lead system integrators....

  14. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Industrial preparedness... ACQUISITION REGULATIONS SOLICITATIONS PROVISIONS AND CONTRACT CLAUSES 5152.208-9001 Industrial preparedness... contractor is designated a Limited Fee Planned Producer. Industrial Preparedness Planning (XXX 1989) (DEV)...

  15. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Industrial preparedness... ACQUISITION REGULATIONS SOLICITATIONS PROVISIONS AND CONTRACT CLAUSES 5152.208-9001 Industrial preparedness... contractor is designated a Limited Fee Planned Producer. Industrial Preparedness Planning (XXX 1989) (DEV)...

  16. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Industrial preparedness... ACQUISITION REGULATIONS SOLICITATIONS PROVISIONS AND CONTRACT CLAUSES 5152.208-9001 Industrial preparedness... contractor is designated a Limited Fee Planned Producer. Industrial Preparedness Planning (XXX 1989) (DEV)...

  17. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Industrial preparedness... ACQUISITION REGULATIONS SOLICITATIONS PROVISIONS AND CONTRACT CLAUSES 5152.208-9001 Industrial preparedness... contractor is designated a Limited Fee Planned Producer. Industrial Preparedness Planning (XXX 1989) (DEV)...

  18. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Industrial preparedness... ACQUISITION REGULATIONS SOLICITATIONS PROVISIONS AND CONTRACT CLAUSES 5152.208-9001 Industrial preparedness... contractor is designated a Limited Fee Planned Producer. Industrial Preparedness Planning (XXX 1989) (DEV)...

  19. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: CONTRACTOR BUSINESS SYSTEMS (MAY 2011) (a) Definitions. As used in this...

  20. 48 CFR 752.7013 - Contractor-mission relationships.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... relationships. 752.7013 Section 752.7013 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is...

  1. 48 CFR 2452.251-70 - Contractor employee travel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT...

  2. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Composition of the... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one...

  3. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Composition of the... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one...

  4. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Composition of the... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one...

  5. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Composition of the... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one...

  6. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Composition of the... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one...

  7. 48 CFR 2804.470 - Contractor Personnel Security Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Personnel Security Program. 2804.470 Section 2804.470 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE... Personnel Security Program....

  8. 48 CFR 970.5226-1 - Diversity plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Diversity plan. 970.5226-1... and Operating Contracts 970.5226-1 Diversity plan. As prescribed in 970.2671-2, insert the following clause: Diversity Plan (DEC 2000) The Contractor shall submit a Diversity Plan to the Contracting...

  9. 48 CFR 970.5226-1 - Diversity plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Diversity plan. 970.5226-1... and Operating Contracts 970.5226-1 Diversity plan. As prescribed in 970.2671-2, insert the following clause: Diversity Plan (DEC 2000) The Contractor shall submit a Diversity Plan to the Contracting...

  10. 48 CFR 970.5226-1 - Diversity plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Diversity plan. 970.5226-1... and Operating Contracts 970.5226-1 Diversity plan. As prescribed in 970.2671-2, insert the following clause: Diversity Plan (DEC 2000) The Contractor shall submit a Diversity Plan to the Contracting...

  11. A framework for knowledge acquisition, representation and problem-solving in knowledge-based planning

    NASA Astrophysics Data System (ADS)

    Martinez-Bermudez, Iliana

    This research addresses the problem of developing planning knowledge-based applications. In particular, it is concerned with the problems of knowledge acquisition and representation---the issues that remain an impediment to the development of large-scale, knowledge-based planning applications. This work aims to develop a model of planning problem solving that facilitates expert knowledge elicitation and also supports effective problem solving. Achieving this goal requires determining the types of knowledge used by planning experts, the structure of this knowledge, and the problem-solving process that results in the plan. While answering these questions it became clear that the knowledge structure, as well as the process of problem solving, largely depends on the knowledge available to the expert. This dissertation proposes classification of planning problems based on their use of expert knowledge. Such classification can help in the selection of the appropriate planning method when dealing with a specific planning problem. The research concentrates on one of the identified classes of planning problems that can be characterized by well-defined and well-structured problem-solving knowledge. To achieve a more complete knowledge representation architecture for such problems, this work employs the task-specific approach to problem solving. The result of this endeavor is a task-specific methodology that allows the representation and use of planning knowledge in a structural, consistent manner specific to the domain of the application. The shell for building a knowledge-based planning application was created as a proof of concept for the methodology described in this dissertation. This shell enabled the development of a system for manufacturing planning---COMPLAN. COMPLAN encompasses knowledge related to four generic techniques used in composite material manufacturing and, given the description of the composite part, creates a family of plans capable of producing it.

  12. 78 FR 11164 - Policy on Contractor Profits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... Defense Acquisition Regulations System Policy on Contractor Profits AGENCY: Defense Acquisition..., at 703- 693-1145. Please cite NDAA FY 2013 Profit Policy Public Meeting. SUPPLEMENTARY INFORMATION... private sector about the requirements of section 804 of the National Defense Authorization Act for...

  13. 48 CFR 2936.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 2936.201 Section 2936.201 Federal Acquisition Regulations System DEPARTMENT OF LABOR...

  14. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of...

  15. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of...

  16. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of...

  17. 48 CFR 227.7108 - Contractor data repositories.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... repositories. 227.7108 Section 227.7108 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established when permitted by agency procedures. The contractual instrument establishing the data repository...

  18. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of...

  19. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising....

  20. 48 CFR 225.370 - Contractors performing private security functions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractors performing private security functions. 225.370 Section 225.370 Federal Acquisition Regulations System DEFENSE... Performed Outside the United States 225.370 Contractors performing private security functions....

  1. 48 CFR 225.370 - Contractors performing private security functions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractors performing private security functions. 225.370 Section 225.370 Federal Acquisition Regulations System DEFENSE... Performed Outside the United States 225.370 Contractors performing private security functions....

  2. 48 CFR 225.370 - Contractors performing private security functions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractors performing private security functions. 225.370 Section 225.370 Federal Acquisition Regulations System DEFENSE... Performed Outside the United States 225.370 Contractors performing private security functions....

  3. 48 CFR 970.4402 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing system. 970.4402 Section 970.4402 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor...

  4. 48 CFR 245.105 - Contractor's property management system compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractor's property management system compliance. The assigned property administrator shall perform... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor's...

  5. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Government-Contractor Relations. 1552.237-76 Section 1552.237-76 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following...

  6. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Government-Contractor Relations. 1552.237-76 Section 1552.237-76 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following...

  7. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Government-Contractor Relations. 1552.237-76 Section 1552.237-76 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following...

  8. 48 CFR 1845.610 - Sale of surplus contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Sale of surplus contractor inventory. 1845.610 Section 1845.610 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Inventory 1845.610 Sale of surplus contractor inventory....

  9. Design techniques for developing a computerized instrumentation test plan. [for wind tunnel test data acquisition system

    NASA Technical Reports Server (NTRS)

    Burnett, S. Kay; Forsyth, Theodore J.; Maynard, Everett E.

    1987-01-01

    The development of a computerized instrumentation test plan (ITP) for the NASA/Ames Research Center National Full Scale Aerodynamics Complex (NFAC) is discussed. The objective of the ITP program was to aid the instrumentation engineer in documenting the configuration and calibration of data acquisition systems for a given test at any of four low speed wind tunnel facilities (Outdoor Aerodynamic Research Facility, 7 x 10, 40 x 80, and 80 x 120) at the NFAC. It is noted that automation of the ITP has decreased errors, engineering hours, and setup time while adding a higher level of consistency and traceability.

  10. NASA activities and plans. [on satellite tracking, data acquisition, communication and mission control systems and capabilities

    NASA Technical Reports Server (NTRS)

    Smylie, R. E.

    1981-01-01

    An overview is provided of the NASA tracking, data acquisition, communications, and mission control systems and capabilities. These systems include the NASA Spaceflight Tracking and Data Network (STDN) which supports earth-orbital spacecraft, the Deep Space Network (DSN) which supports the planetary exploration and deep space missions, and the Tracking and Data Relay Satellite System (TDRSS) currently under development and scheduled to come into service in 1983. TDRSS will then displace STDN for support of low earth orbital spacecraft. A description is presented of the current status of the considered systems, and plans are discussed for future developments and new capabilities.

  11. 48 CFR 245.603-70 - Contractor performance of plant clearance duties.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... plant clearance duties. 245.603-70 Section 245.603-70 Federal Acquisition Regulations System DEFENSE..., Redistribution, and Disposal of Contractor Inventory 245.603-70 Contractor performance of plant clearance duties... activity approval and contractor concurrence, authorize selected contractors to perform certain...

  12. 48 CFR 245.7205 - Reporting excess and surplus contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... surplus contractor inventory. 245.7205 Section 245.7205 Federal Acquisition Regulations System DEFENSE... Instructions 245.7205 Reporting excess and surplus contractor inventory. (a) Contract administration offices... Contractor Inventory, or mechanized equivalent, to report the disposition of contractor inventory. Do...

  13. 48 CFR 2828.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Group insurance plans. 2828... Contracting Requirements BONDS AND INSURANCE Insurance 2828.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit...

  14. 48 CFR 428.307-1 - Group insurance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit...

  15. 48 CFR 428.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Group insurance plans. 428... CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.307-1 Group insurance plans. Under cost-reimbursement contracts, before buying insurance under a group insurance plan, the contractor shall submit...

  16. 48 CFR 228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under...

  17. 48 CFR 228.307-1 - Group insurance plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Group insurance plans. 228..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 228.307-1 Group insurance plans. The Defense Department Group Term Insurance Plan is available for contractor use under...

  18. 48 CFR 1852.236-73 - Hurricane plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Hurricane plan. 1852.236... 1852.236-73 Hurricane plan. As prescribed in 1836.570(c), insert the following clause: Hurricane Plan (DEC 1988) In the event of a hurricane warning, the Contractor shall— (a) Inspect the area and...

  19. 48 CFR 1852.236-73 - Hurricane plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Hurricane plan. 1852.236-73... Hurricane plan. As prescribed in 1836.570(c), insert the following clause: Hurricane Plan (DEC 1988) In the event of a hurricane warning, the Contractor shall— (a) Inspect the area and place all...

  20. 48 CFR 1852.236-73 - Hurricane plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Hurricane plan. 1852.236... 1852.236-73 Hurricane plan. As prescribed in 1836.570(c), insert the following clause: Hurricane Plan (DEC 1988) In the event of a hurricane warning, the Contractor shall— (a) Inspect the area and...

  1. 48 CFR 1852.236-73 - Hurricane plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Hurricane plan. 1852.236... 1852.236-73 Hurricane plan. As prescribed in 1836.570(c), insert the following clause: Hurricane Plan (DEC 1988) In the event of a hurricane warning, the Contractor shall— (a) Inspect the area and...

  2. 48 CFR 1852.236-73 - Hurricane plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Hurricane plan. 1852.236... 1852.236-73 Hurricane plan. As prescribed in 1836.570(c), insert the following clause: Hurricane Plan (DEC 1988) In the event of a hurricane warning, the Contractor shall— (a) Inspect the area and...

  3. 48 CFR 945.610-4 - Contractor inventory in foreign countries.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor inventory in foreign countries. 945.610-4 Section 945.610-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 945.610-4 Contractor inventory in...

  4. 48 CFR 1845.610-4 - Contractor inventory in foreign countries.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inventory in foreign countries. 1845.610-4 Section 1845.610-4 Federal Acquisition Regulations System NATIONAL... Disposal of Contractor Inventory 1845.610-4 Contractor inventory in foreign countries. NASA procedures...

  5. 48 CFR 1552.216-78 - Award term incentive plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Award term incentive plan. 1552.216-78 Section 1552.216-78 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY... National Institutes of Health (NIH) Contractor Performance System (CPS) for this contract. The NIHCPS is...

  6. Mission planning for operational data acquisition campaigns with the {sup casi}

    SciTech Connect

    Wulder, M.; Mah, S.; Trudeau, D.

    1996-11-01

    The compact airborne spectrographic imager (casi) is a pushbroom style airborne remote sensing instrument which has been used for a variety of applications suited to its high performance, portability, flexibility in choice of spectral bands and imaging combinations, image geocoding capabilities, low-cost data acquisition, and relative ease of use and processing. As the casi may be configured to operate in either spatial or spectral mode the user decides which is most appropriate for the needs of a particular study. Spatial mode is appropriate for identifying and mapping attributes spatially using a priori spectral knowledge whereas spectral mode is well suited to identifying detailed spectral characteristics of a feature. The hyperspectral acquisition mode is a combination of both spatial and spectral operations, where contiguous spatial and spectral information are collected. The array of imaging possibilities provided by the casi requires the user to make many decisions. Yet, the options provided by the casi are not the only issues that need to be addressed pre-flight. Other considerations are flight azimuth, positioning of flight lines, sun angle, differential correction of airborne GPS data, and possible collection of pseudo-invariant features (PIFs) with a spectroradiometer. The above issues need to be addressed to reduce sun {open_quotes}hot spots{close_quotes}, sun glint, minimize bidirectional effects, and improve image mosaicking. Data may be acquired to optimize use of a downwelling irradiance sensor, real-time attitude sensing using either a vertical gyroscope or Inertial Navigation System, and differential GPS measurements. The goal of this paper is to provide a general {open_quotes}guide{close_quotes} for airborne casi remote sensing mission planning that will facilitate the acquisition of quality imagery for forestry, water, environmental, and mapping applications. 36 refs., 1 fig., 2 tabs.

  7. Large-scale demonstration test plan for digface data acquisition system

    SciTech Connect

    Roybal, L.G.; Svoboda, J.M.

    1994-11-01

    Digface characterization promotes the use of online site characterization and monitoring during waste retrieval efforts, a need that arises from safety and efficiency considerations during the cleanup of a complex waste site. Information concerning conditions at the active digface can be used by operators as a basis for adjusting retrieval activities to reduce safety risks and to promote an efficient transition between retrieval and downstream operations. Most importantly, workers are given advance warning of upcoming dangerous conditions. In addition, detailed knowledge of digface conditions provides a basis for selecting tools and methods that avoid contamination spread and work stoppages. In FY-94, work began in support of a largescale demonstration coordinating the various facets of a prototype digface remediation operation including characterization, contaminant suppression, and cold waste retrieval. This test plan describes the activities that will be performed during the winter of FY-95 that are necessary to assess the performance of the data acquisition and display system in its initial integration with hardware developed in the Cooperative Telerobotic Retrieval (CTR) program. The six specific objectives of the test are determining system electrical noise, establishing a dynamic background signature of the gantry crane and associated equipment, determining the resolution of the overall system by scanning over known objects, reporting the general functionality of the overall data acquisition system, evaluating the laser topographic functionality, and monitoring the temperature control features of the electronic package.

  8. A Study Of The Potential For Digital Radiographic Data Acquisition For Radiation Therapy Treatment Planning

    NASA Astrophysics Data System (ADS)

    Edwards, M.; Keller, J.; Hobson, G.

    1983-12-01

    While the quantitative nature of digital fluroscopic and digital radiographic imaging would seem to make possible many radiotherapeutic applications, significant problems must first be solved. The purpose of this study is to examine the potential benefits of digital imaging in radiation therapy, identify what problems must be solved to attain these benefits, and attempt to make some assessment as to the relative merits of developing such technologies. Among the potential benefits are ability to do contrast-subtraction studies for tumor and/or normal structure localization and portal placement, digital simulation of portal placement and treatment delivery, spatial localization and digitization of inhomogeneity boundaries, spatial localization and digitization of brachytherapy sources, and quantitative inhomogeneity acquisition for dosimetry calculations. Significant problems which must be solved include image receptor size limitations, image acquisition geometry related spatial distortion, three dimensional region calculation from limited views, and physical interpretation of digital image grey levels. Maximal benefits of digital imaging in radiation oncology is likely to be obtained by the development of large area image receptors for use in therapy simulators with direct data link to a combined image-analysis/treatment planning computer.

  9. 48 CFR 36.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects...

  10. 48 CFR 36.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects...

  11. 48 CFR 36.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects...

  12. 48 CFR 36.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects...

  13. 48 CFR 3052.204-71 - Contractor employee access.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Contractor employee access. 3052.204-71 Section 3052.204-71 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and...

  14. 48 CFR 3052.204-71 - Contractor employee access.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Contractor employee access. 3052.204-71 Section 3052.204-71 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and...

  15. 48 CFR 227.7108 - Contractor data repositories.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor data repositories. 227.7108 Section 227.7108 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights...

  16. 48 CFR 27.404-4 - Contractor's release, publication, and use of data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Contractor's release, publication, and use of data. 27.404-4 Section 27.404-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.404-4 Contractor's...

  17. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Accounting Standards under 41 U.S.C. chapter 15, as implemented in regulations found at 48 CFR 9903.201-1... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this...

  18. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Accounting Standards under 41 U.S.C. chapter 15, as implemented in regulations found at 48 CFR 9903.201-1... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this...

  19. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... regulations found at 48 CFR 9903.201-1 (see the FAR Appendix). (b) Definitions. As used in this clause... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001,...

  20. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... regulations found at 48 CFR 9903.201-1 (see the FAR Appendix). (b) Definitions. As used in this clause... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001,...

  1. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Accounting Standards under 41 U.S.C. chapter 15, as implemented in regulations found at 48 CFR 9903.201-1... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business system... BUSINESS SYSTEMS 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this...

  2. 48 CFR 45.501 - Prime contractor alternate locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor alternate locations. The property administrator assigned to the prime contract may request support...

  3. 48 CFR 53.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Responsible prospective... (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209-1 Responsible prospective contractors. (a) SF 1403 (Rev. 9/88), Preaward Survey of Prospective Contractor (General). SF 1403 is authorized...

  4. 48 CFR 2132.170 - Recurring premium payments to Contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Recurring premium payments... REQUIREMENTS CONTRACT FINANCING General 2132.170 Recurring premium payments to Contractors. (a) OPM will make... specified in the contract. The annual premium to the Contractor, based on this estimate, will be credited...

  5. 48 CFR 2132.170 - Recurring premium payments to Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Recurring premium payments... REQUIREMENTS CONTRACT FINANCING General 2132.170 Recurring premium payments to Contractors. (a) OPM will make... specified in the contract. The annual premium to the Contractor, based on this estimate, will be credited...

  6. 48 CFR 2132.170 - Recurring premium payments to Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Recurring premium payments... REQUIREMENTS CONTRACT FINANCING General 2132.170 Recurring premium payments to Contractors. (a) OPM will make... specified in the contract. The annual premium to the Contractor, based on this estimate, will be credited...

  7. 48 CFR 2132.170 - Recurring premium payments to Contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Recurring premium payments... REQUIREMENTS CONTRACT FINANCING General 2132.170 Recurring premium payments to Contractors. (a) OPM will make... specified in the contract. The annual premium to the Contractor, based on this estimate, will be credited...

  8. 48 CFR 245.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractors' property management system compliance. (a) Definitions— (1) Acceptable property management system and property management system are defined in the clause at 252.245-7003, Contractor...

  9. 48 CFR 245.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractors' property management system compliance. (a) Definitions— (1) Acceptable property management system and property management system are defined in the clause at 252.245-7003, Contractor...

  10. 48 CFR 245.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractors' property management system compliance. (a) Definitions— (1) Acceptable property management system and property management system are defined in the clause at 252.245-7003, Contractor...

  11. 48 CFR 245.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractors' property management system compliance. (a) Definitions— (1) Acceptable property management system and property management system are defined in the clause at 252.245-7003, Contractor...

  12. 48 CFR 642.1503-70 - Contractor Performance System (CPS).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 642.1503... allowing contracting officers to input past performance information and view past performance information... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor...

  13. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... regulations found at 48 CFR 9903.201-1 (see the FAR Appendix). (b) Definitions. As used in this clause... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001,...

  14. Astronomical Interlibrary Cooperation: The Long and Difficult Plan for Coordinated Acquisition of Journals -- the Italian Case

    NASA Astrophysics Data System (ADS)

    Gasperini, A.; Abrami, L.; Olostro Cirella, E.

    2007-10-01

    Until 2002, the Italian astronomical observatories were independent research institutes. Their libraries, though different in their origins and history, shared common bibliographical materials, users and aims. This situation prompted a first experience of unofficial cooperation between astronomical observatory libraries, which produced outstanding results, in particular a detailed survey of the nature, cost and use of scientific journals. Starting from 2002, when the 12 observatories merged into a single institution, the National Institute for Astrophysics (INAF), the experience of cooperation between the libraries became official. The INAF headquarters, in fact, has recently established the Library Documentary and Archive Service of the National Institute for Astrophysics (SBDA-INAF) in order to have a centralized astronomical bibliographical service and to promote cooperation among libraries. At the end of 2004, following the INAF rearrangement, 5 Institutes of the National Research Council (CNR) joined the still new organization introducing further complications. In this work we explain all the problems faced by a working group to elaborate an efficient plan of coordinated acquisition of journals: the difficulties in coordinating 17 different sites distributed over the whole national territory, the not so easy negotiation with the publishers, the choice between e-only or print & online and, last but not least, the psychological impact on the scientific community. The cooperation among Italian astronomical libraries was a plan begun many years ago and has continued through various events over the years. This presentation takes into consideration the various stages of our project focusing on some crucial aspects.

  15. Contractor and government - Teamwork and commitment

    NASA Technical Reports Server (NTRS)

    Griffin, G. D.

    1985-01-01

    Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

  16. 41 CFR 102-34.80 - Where may we obtain help with our motor vehicle acquisition plans?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Where may we obtain help with our motor vehicle acquisition plans? 102-34.80 Section 102-34.80 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 34-MOTOR VEHICLE...

  17. 41 CFR 102-34.80 - Where may we obtain help with our motor vehicle acquisition plans?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... PROPERTY 34-MOTOR VEHICLE MANAGEMENT Obtaining Fuel Efficient Motor Vehicles § 102-34.80 Where may we... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Where may we obtain help with our motor vehicle acquisition plans? 102-34.80 Section 102-34.80 Public Contracts and...

  18. Earth Observing System/Advanced Microwave SoundingUnit-A (EOS/AMSU-A): Acquisition activities plan

    NASA Technical Reports Server (NTRS)

    Schwantje, Robert

    1994-01-01

    This is the acquisition activities plan for the software to be used in the Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) system. This document is submitted in response to Contract NAS5-323 14 as CDRL 508. The procurement activities required to acquire software for the EOS/AMSU-A program are defined.

  19. NNSA?s Computing Strategy, Acquisition Plan, and Basis for Computing Time Allocation

    SciTech Connect

    Nikkel, D J

    2009-07-21

    This report is in response to the Omnibus Appropriations Act, 2009 (H.R. 1105; Public Law 111-8) in its funding of the National Nuclear Security Administration's (NNSA) Advanced Simulation and Computing (ASC) Program. This bill called for a report on ASC's plans for computing and platform acquisition strategy in support of stockpile stewardship. Computer simulation is essential to the stewardship of the nation's nuclear stockpile. Annual certification of the country's stockpile systems, Significant Finding Investigations (SFIs), and execution of Life Extension Programs (LEPs) are dependent on simulations employing the advanced ASC tools developed over the past decade plus; indeed, without these tools, certification would not be possible without a return to nuclear testing. ASC is an integrated program involving investments in computer hardware (platforms and computing centers), software environments, integrated design codes and physical models for these codes, and validation methodologies. The significant progress ASC has made in the past derives from its focus on mission and from its strategy of balancing support across the key investment areas necessary for success. All these investment areas must be sustained for ASC to adequately support current stockpile stewardship mission needs and to meet ever more difficult challenges as the weapons continue to age or undergo refurbishment. The appropriations bill called for this report to address three specific issues, which are responded to briefly here but are expanded upon in the subsequent document: (1) Identify how computing capability at each of the labs will specifically contribute to stockpile stewardship goals, and on what basis computing time will be allocated to achieve the goal of a balanced program among the labs. (2) Explain the NNSA's acquisition strategy for capacity and capability of machines at each of the labs and how it will fit within the existing budget constraints. (3) Identify the technical

  20. Contractor or Employee? Reporting Independent Contractor Payments.

    ERIC Educational Resources Information Center

    Dickson, Roger J.

    1993-01-01

    Congress has approved new penalties to be assessed against employers who improperly file required tax forms. Includes a 20-factor control test developed by the Internal Revenue Service to help determine whether a worker is an employee or an independent contractor. School business officials should review payment procedures to ensure that proper tax…

  1. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false VA Small business subcontracting plan minimum requirements. 852.219-9 Section 852.219-9 Federal Acquisition Regulations System... database. The contractor shall annually submit a listing of service-disabled veteran-owned small...

  2. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The...

  3. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The...

  4. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The...

  5. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The...

  6. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The...

  7. 48 CFR 52.223-18 - Contractor Policy to Ban Text Messaging While Driving.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Policy to Ban... Text of Provisions and Clauses 52.223-18 Contractor Policy to Ban Text Messaging While Driving. As prescribed in 23.1105, insert the following clause: CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE...

  8. 48 CFR 245.608-7 - Reimbursement of cost for transfer of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... transfer of contractor inventory. 245.608-7 Section 245.608-7 Federal Acquisition Regulations System... Reporting, Redistribution, and Disposal of Contractor Inventory 245.608-7 Reimbursement of cost for transfer of contractor inventory. The Defense Logistics Agency will pay for the movement of industrial...

  9. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) (a) The Contractor...

  10. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) (a) The Contractor...

  11. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) (a) The Contractor...

  12. 48 CFR 222.101-4 - Removal of items from contractors' facilities affected by work stoppages.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractors' facilities affected by work stoppages. 222.101-4 Section 222.101-4 Federal Acquisition... contractors' facilities affected by work stoppages. (a) When a contractor is unable to deliver urgent and critical items because of a work stoppage at its facility, the contracting officer, before removing...

  13. 48 CFR 222.101-4 - Removal of items from contractors' facilities affected by work stoppages.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors' facilities affected by work stoppages. 222.101-4 Section 222.101-4 Federal Acquisition... contractors' facilities affected by work stoppages. (a) When a contractor is unable to deliver urgent and critical items because of a work stoppage at its facility, the contracting officer, before removing...

  14. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984)...

  15. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984)...

  16. 48 CFR 47.303-2 - F.o.b. origin, contractor's facility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false F.o.b. origin, contractor... REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.303-2 F.o.b. origin, contractor's facility. (a) Explanation of delivery term. F.o.b. origin, contractor's facility means free...

  17. 48 CFR 47.303-2 - F.o.b. origin, contractor's facility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false F.o.b. origin, contractor... REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.303-2 F.o.b. origin, contractor's facility. (a) Explanation of delivery term. F.o.b. origin, contractor's facility means free...

  18. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984)...

  19. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984)...

  20. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984)...

  1. 48 CFR 245.608-70 - Contractor inventory redistribution system (CIRS).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... redistribution system (CIRS). 245.608-70 Section 245.608-70 Federal Acquisition Regulations System DEFENSE..., Redistribution, and Disposal of Contractor Inventory 245.608-70 Contractor inventory redistribution system (CIRS). (a) Screen serviceable and usable contractor inventory through CIRS when it— (1) Is listed on SF...

  2. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) (a) The Contractor...

  3. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) (a) The Contractor...

  4. 48 CFR 1909.404 - Consolidated list of debarred, suspended, and ineligible contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... debarred, suspended, and ineligible contractors. 1909.404 Section 1909.404 Federal Acquisition Regulations..., Suspension, and Ineligibility 1909.404 Consolidated list of debarred, suspended, and ineligible contractors... and distribution of the GSA Consolidated List of Debarred, Suspended, and Ineligible Contractors....

  5. 48 CFR 52.247-30 - F.o.b. Origin, Contractor's Facility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false F.o.b. Origin, Contractor... Clauses 52.247-30 F.o.b. Origin, Contractor's Facility. As prescribed in 47.303-2(c), insert the following clause in solicitations and contracts when the delivery term is f.o.b. origin, contractor's facility:...

  6. 48 CFR 47.303-2 - F.o.b. origin, contractor's facility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false F.o.b. origin, contractor... REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.303-2 F.o.b. origin, contractor's facility. (a) Explanation of delivery term. F.o.b. origin, contractor's facility means free...

  7. 48 CFR 52.247-30 - F.o.b. Origin, Contractor's Facility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false F.o.b. Origin, Contractor... Clauses 52.247-30 F.o.b. Origin, Contractor's Facility. As prescribed in 47.303-2(c), insert the following clause in solicitations and contracts when the delivery term is f.o.b. origin, contractor's facility:...

  8. 48 CFR 47.303-2 - F.o.b. origin, contractor's facility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false F.o.b. origin, contractor... REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.303-2 F.o.b. origin, contractor's facility. (a) Explanation of delivery term. F.o.b. origin, contractor's facility means free...

  9. 48 CFR 52.247-30 - F.o.b. Origin, Contractor's Facility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false F.o.b. Origin, Contractor... Clauses 52.247-30 F.o.b. Origin, Contractor's Facility. As prescribed in 47.303-2(c), insert the following clause in solicitations and contracts when the delivery term is f.o.b. origin, contractor's facility:...

  10. 48 CFR 47.303-2 - F.o.b. origin, contractor's facility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false F.o.b. origin, contractor... REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.303-2 F.o.b. origin, contractor's facility. (a) Explanation of delivery term. F.o.b. origin, contractor's facility means free...

  11. Seeing Glass Contractors Clearly.

    ERIC Educational Resources Information Center

    Deliberato, Jerry

    2003-01-01

    Offers seven tips for finding and working with an effective glass contractor. For example, schools should consider the company's reputation and longevity of service, and whether it has in-house engineering capabilities. (EV)

  12. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... commensurate with contingent import tax and duty-free liability. This bank guaranty or fund shall not be released to the Contractor until the Spanish General Directorate of Customs verifies the accounting, export... DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION...

  13. 48 CFR 253.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contractors. 253.209-1 Section 253.209-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209-1 Responsible... current. (When checked, the surveying activity will refer this factor to the Defense Security Service...

  14. 48 CFR 3036.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) 48 CFR 36.201. Access to reports is through the CPS or the government-wide system, Past Performance... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND...

  15. 77 FR 6676 - Office of Inspector General; Contractor Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-09

    ... as ensure the use of contracting best practices as established by the Federal Acquisition Regulations... contracting best practices as established by the Federal Acquisition Regulations and other applicable sources.... SUMMARY: This rule establishes standards of qualification and responsibility for contractors employed...

  16. 48 CFR 252.244-7001 - Contractor purchasing system administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... system or systems for purchasing and subcontracting, including make-or-buy decisions, the selection of... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor purchasing system administration. 252.244-7001 Section 252.244-7001 Federal Acquisition Regulations System...

  17. 48 CFR 252.244-7001 - Contractor purchasing system administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... system or systems for purchasing and subcontracting, including make-or-buy decisions, the selection of... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor purchasing system administration. 252.244-7001 Section 252.244-7001 Federal Acquisition Regulations System...

  18. 48 CFR 436.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Evaluation of contractor performance. 436.201 Section 436.201 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting...

  19. 48 CFR 436.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Evaluation of contractor performance. 436.201 Section 436.201 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting...

  20. 48 CFR 2936.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Evaluation of contractor performance. 2936.201 Section 2936.201 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting...

  1. 48 CFR 436.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Evaluation of contractor performance. 436.201 Section 436.201 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting...

  2. 48 CFR 2936.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Evaluation of contractor performance. 2936.201 Section 2936.201 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting...

  3. 48 CFR 2936.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Evaluation of contractor performance. 2936.201 Section 2936.201 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting...

  4. 48 CFR 2936.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Evaluation of contractor performance. 2936.201 Section 2936.201 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting...

  5. 48 CFR 436.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Evaluation of contractor performance. 436.201 Section 436.201 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting...

  6. 48 CFR 253.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... an accounting system review when soliciting and awarding cost-reimbursement or incentive type... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Responsible prospective contractors. 253.209-1 Section 253.209-1 Federal Acquisition Regulations System DEFENSE...

  7. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Other Improper Business...

  8. Debarment, suspension, and ineligibility of contractors--DHHS. Final rule.

    PubMed

    1985-02-26

    The Office of the Secretary, Department of Health and Human Services, is amending the HHS Acquisition Regulation, Title 48 CFR Chapter 3, by adding a new subpart concerning debarment, suspension, and ineligibility of contractors. This new subpart will implement the provisions of Subpart 9.4, Debarment, Suspension and Ineligibility, of the Federal Acquisition Regulations. PMID:10270025

  9. Debarment, suspension, and ineligibility of contractors--HHS. Proposed rule.

    PubMed

    1984-06-14

    The Office of the Secretary, Department of Health and Human Services, is proposing to amend the HHS Acquisition Regulation by adding a new subpart concerning debarment, suspension, and ineligibility of contractors. This new subpart will implement the provisions of Subpart 9.4, Debarment, Suspension and Ineligibility, of the Federal Acquisition Regulation. PMID:10266832

  10. 77 FR 56645 - Federal Acquisition Regulation; Information Collection; Accident Prevention Plans and Recordkeeping

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... Regulation; Information Collection; Accident Prevention Plans and Recordkeeping AGENCY: Department of Defense... reinstatement of a previously approved information collection requirement concerning Accident Prevention Plans... 9000- 0060, Accident Prevention Plans and Recordkeeping by any of the following methods:...

  11. 48 CFR 2922.101-4 - Removal of items from contractor facilities affected by work stoppages.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Removal of items from contractor facilities affected by work stoppages. 2922.101-4 Section 2922.101-4 Federal Acquisition... stoppages. Before initiating any action under FAR 22.101-4 for removal of items from contractors'...

  12. 48 CFR 22.101-4 - Removal of items from contractors' facilities affected by work stoppages.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Removal of items from contractors' facilities affected by work stoppages. 22.101-4 Section 22.101-4 Federal Acquisition Regulations... stoppages. (a) Items shall be removed from contractors' facilities affected by work stoppages in...

  13. 48 CFR 22.101-4 - Removal of items from contractors' facilities affected by work stoppages.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Removal of items from contractors' facilities affected by work stoppages. 22.101-4 Section 22.101-4 Federal Acquisition Regulations... stoppages. (a) Items shall be removed from contractors' facilities affected by work stoppages in...

  14. 48 CFR 1422.101-4 - Removal of items from contractors' facilities affected by work stoppages.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Removal of items from contractors' facilities affected by work stoppages. 1422.101-4 Section 1422.101-4 Federal Acquisition... stoppages. Prior to initiating any action for removal of items from contractors' facilities, the CO...

  15. 48 CFR 1422.101-4 - Removal of items from contractors' facilities affected by work stoppages.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Removal of items from contractors' facilities affected by work stoppages. 1422.101-4 Section 1422.101-4 Federal Acquisition... stoppages. Prior to initiating any action for removal of items from contractors' facilities, the CO...

  16. 48 CFR 2922.101-4 - Removal of items from contractor facilities affected by work stoppages.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Removal of items from contractor facilities affected by work stoppages. 2922.101-4 Section 2922.101-4 Federal Acquisition... stoppages. Before initiating any action under FAR 22.101-4 for removal of items from contractors'...

  17. 48 CFR 53.301-1403 - Preaward Survey of Prospective Contractor (General).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Preaward Survey of Prospective Contractor (General). 53.301-1403 Section 53.301-1403 Federal Acquisition Regulations System... Preaward Survey of Prospective Contractor (General). EC01MY91.081 EC01MY91.082...

  18. 48 CFR 25.302 - Contractors performing private security functions outside the United States.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Contractors performing private security functions outside the United States. 25.302 Section 25.302 Federal Acquisition... Performed Outside the United States 25.302 Contractors performing private security functions outside...

  19. 48 CFR 25.302 - Contractors performing private security functions outside the United States.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Contractors performing private security functions outside the United States. 25.302 Section 25.302 Federal Acquisition... Performed Outside the United States 25.302 Contractors performing private security functions outside...

  20. 48 CFR 945.102-70 - Reporting of contractor-held property.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Reporting of contractor-held property. 945.102-70 Section 945.102-70 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 945.102-70 Reporting of contractor-held property. Within 30 days after the end of each fiscal...

  1. 48 CFR 970.4402-3 - Purchasing from contractor-affiliated sources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Purchasing from contractor-affiliated sources. 970.4402-3 Section 970.4402-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing...

  2. 48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Patent Rights-Retention by the Contractor (Short Form). 1852.227-11 Section 1852.227-11 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.227-11 Patent Rights—Retention by the Contractor (Short...

  3. 48 CFR 18.126 - Contractor rent-free use of Government property.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Contractor rent-free use of Government property. 18.126 Section 18.126 Federal Acquisition Regulations System FEDERAL... Flexibilities 18.126 Contractor rent-free use of Government property. Rental requirements do not apply to...

  4. 48 CFR 252.237-7023 - Continuation of Essential Contractor Services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... paragraph (a) of this section during a crisis. (1) The Contractor shall identify in the plan the provisions... responsibilities during a crisis. (3) The Contractor shall maintain and update its plan as necessary and adhere to... paragraph (a) of this section during a crisis situation, the Contractor shall notify the Contracting...

  5. 48 CFR 213.302-3 - Obtaining contractor acceptance and modifying purchase orders.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Obtaining contractor acceptance and modifying purchase orders. 213.302-3 Section 213.302-3 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES...

  6. 48 CFR 1313.302-3 - Obtaining contractor acceptance and modifying purchase orders.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Obtaining contractor acceptance and modifying purchase orders. 1313.302-3 Section 1313.302-3 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Simplified Acquisitions Methods...

  7. 77 FR 45612 - Federal Acquisition Regulation; Information Collection; Professional Employee Compensation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... Regulation; Information Collection; Professional Employee Compensation Plan AGENCY: Department of Defense... previously approved information collection requirement concerning submission of a Professional Employee Compensation Plan. Public comments are particularly invited on: Whether this collection of information...

  8. Acquisition, preprocessing, and reconstruction of ultralow dose volumetric CT scout for organ-based CT scan planning

    SciTech Connect

    Yin, Zhye De Man, Bruno; Yao, Yangyang; Wu, Mingye; Montillo, Albert; Edic, Peter M.; Kalra, Mannudeep

    2015-05-15

    Purpose: Traditionally, 2D radiographic preparatory scan images (scout scans) are used to plan diagnostic CT scans. However, a 3D CT volume with a full 3D organ segmentation map could provide superior information for customized scan planning and other purposes. A practical challenge is to design the volumetric scout acquisition and processing steps to provide good image quality (at least good enough to enable 3D organ segmentation) while delivering a radiation dose similar to that of the conventional 2D scout. Methods: The authors explored various acquisition methods, scan parameters, postprocessing methods, and reconstruction methods through simulation and cadaver data studies to achieve an ultralow dose 3D scout while simultaneously reducing the noise and maintaining the edge strength around the target organ. Results: In a simulation study, the 3D scout with the proposed acquisition, preprocessing, and reconstruction strategy provided a similar level of organ segmentation capability as a traditional 240 mAs diagnostic scan, based on noise and normalized edge strength metrics. At the same time, the proposed approach delivers only 1.25% of the dose of a traditional scan. In a cadaver study, the authors’ pictorial-structures based organ localization algorithm successfully located the major abdominal-thoracic organs from the ultralow dose 3D scout obtained with the proposed strategy. Conclusions: The authors demonstrated that images with a similar degree of segmentation capability (interpretability) as conventional dose CT scans can be achieved with an ultralow dose 3D scout acquisition and suitable postprocessing. Furthermore, the authors applied these techniques to real cadaver CT scans with a CTDI dose level of less than 0.1 mGy and successfully generated a 3D organ localization map.

  9. Unions, Contractors and CTE

    ERIC Educational Resources Information Center

    Jarosz, Francesca

    2006-01-01

    Across Illinois, in places where unions thrive, construction industry professionals and career and technical education (CTE) teachers are working together in promoting work-based learning program to students. Likewise, the outreach program provides union-supported contractors with qualified candidates for future employment. Programs such as the…

  10. Continuous table acquisition MRI for radiotherapy treatment planning: Distortion assessment with a new extended 3D volumetric phantom

    SciTech Connect

    Walker, Amy Metcalfe, Peter; Liney, Gary; Holloway, Lois; Dowling, Jason; Rivest-Henault, David

    2015-04-15

    Purpose: Accurate geometry is required for radiotherapy treatment planning (RTP). When considering the use of magnetic resonance imaging (MRI) for RTP, geometric distortions observed in the acquired images should be considered. While scanner technology and vendor supplied correction algorithms provide some correction, large distortions are still present in images, even when considering considerably smaller scan lengths than those typically acquired with CT in conventional RTP. This study investigates MRI acquisition with a moving table compared with static scans for potential geometric benefits for RTP. Methods: A full field of view (FOV) phantom (diameter 500 mm; length 513 mm) was developed for measuring geometric distortions in MR images over volumes pertinent to RTP. The phantom consisted of layers of refined plastic within which vitamin E capsules were inserted. The phantom was scanned on CT to provide the geometric gold standard and on MRI, with differences in capsule location determining the distortion. MRI images were acquired with two techniques. For the first method, standard static table acquisitions were considered. Both 2D and 3D acquisition techniques were investigated. With the second technique, images were acquired with a moving table. The same sequence was acquired with a static table and then with table speeds of 1.1 mm/s and 2 mm/s. All of the MR images acquired were registered to the CT dataset using a deformable B-spline registration with the resulting deformation fields providing the distortion information for each acquisition. Results: MR images acquired with the moving table enabled imaging of the whole phantom length while images acquired with a static table were only able to image 50%–70% of the phantom length of 513 mm. Maximum distortion values were reduced across a larger volume when imaging with a moving table. Increased table speed resulted in a larger contribution of distortion from gradient nonlinearities in the through

  11. The TerraSAR-X/TanDEM-X Formation Acquisition-from Planning to Realization

    NASA Astrophysics Data System (ADS)

    Kahle, Ralph; Schlepp, Benjamin; Meissner, Florian; Kirschner, Michael; Kiehling, Reinhard

    2012-09-01

    On June 21, 2010 the TanDEM-X satellite (TDX) was injected into orbit at 15,700 km distance from its twin satellite TerraSAR-X (TSX), which has been in orbit since 2007. Already one month later TDX acquired a formation with TSX in order to build up the first single-pass radar interferometer in space. Within three years of close formation flying with flexible baselines ranging from 150 m to a few kilometers the twin satellites will collect interferometric radar measurements for the generation of a global digital elevation model with unprecedented accuracy. This paper elaborates on the TDX pre-launch analysis performed in the fields of collision assessment during orbit injection and target formation acquisition. To avoid a critical close approach shortly after TDX separation, the risk of collision between the already flying TSX satellite and the newly injected elements (DNEPR upper-stage, gas dynamic shield, and TDX satellite) had to be carefully analyzed. Further, the paper discusses a fuel-saving formation acquisition strategy, for which the maneuver budget is analyzed as a function of launch day and launch injection accuracy. Finally, flight results are presented to illustrate the successful formation acquisition realized in July 2010 and the formation reconfiguration process from the 20 km wide formation into the 300-400 m close formation performed in October 2010. This reconfiguration marked the start of the bi-static TDX/TSX instrument operation.

  12. 48 CFR 209.105-2-70 - Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS). 209.105... Contractors 209.105-2-70 Inclusion of determination of contractor fault in Federal Awardee Performance...

  13. 48 CFR 209.105-2-70 - Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS). 209.105... Contractors 209.105-2-70 Inclusion of determination of contractor fault in Federal Awardee Performance...

  14. 48 CFR 209.105-2-70 - Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS). 209.105... Contractors 209.105-2-70 Inclusion of determination of contractor fault in Federal Awardee Performance...

  15. 48 CFR 209.105-2-70 - Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Inclusion of determination of contractor fault in Federal Awardee Performance and Integrity Information System (FAPIIS). 209.105... Contractors 209.105-2-70 Inclusion of determination of contractor fault in Federal Awardee Performance...

  16. Hydrogen Contractors Meeting

    SciTech Connect

    Fitzsimmons, Tim

    2006-05-16

    This volume highlights the scientific content of the 2006 Hydrogen Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) on behalf of the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). Hydrogen Contractors Meeting held from May 16-19, 2006 at the Crystal Gateway Marriott Hotel Arlington, Virginia. This meeting is the second in a series of research theme-based Contractors Meetings sponsored by DMS&E held in conjunction with our counterparts in the Office of Energy Efficiency and Renewable Energy (EERE) and the first with the Hydrogen, Fuel Cells and Infrastructure Technologies Program. The focus of this year’s meeting is BES funded fundamental research underpinning advancement of hydrogen storage. The major goals of these research efforts are the development of a fundamental scientific base in terms of new concepts, theories and computational tools; new characterization capabilities; and new materials that could be used or mimicked in advancing capabilities for hydrogen storage.

  17. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part...

  18. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part...

  19. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part...

  20. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part...

  1. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part...

  2. Government - contractor interaction

    NASA Technical Reports Server (NTRS)

    Thomas, D. M.

    1983-01-01

    The development of the Administrative Contracting Officer represents an advance in the Government system of contract management because it provides an individual with knowledge, time, and a specialized function to insure performance of Government contracts. However, the development has created a dichotomy between the award and the post-award function which increases the adversary relationship with Government contractors. This paper advocates that this adversary relationship can be decreased if PCOs and ACOs are provided with opportunities to serve in the assignments of the other.

  3. Employee vs independent contractor.

    PubMed

    Kolender, Ellen

    2012-01-01

    Finding qualified personnel for the cancer registry department has become increasingly difficult, as experienced abstractors retire and cancer diagnoses increase. Faced with hiring challenges, managers turn to teleworkers to fill positions and accomplish work in a timely manner. Suddenly, the hospital hires new legal staff and all telework agreements are disrupted. The question arises: Are teleworkers employees or independent contractors? Creating telework positions requires approval from the legal department and human resources. Caught off-guard in the last quarter of the year, I found myself again faced with hiring challenges. PMID:23599033

  4. School Facility Logistics. A Study for Alberta Education Dealing with School Planning, Acquisition, and Funding Alternatives.

    ERIC Educational Resources Information Center

    Woods, Gordon and Co., Toronto (Ontario).

    Alternatives to current provincial policies and procedures relating to school construction and its funding are identified and examined. The report sets out findings and recommendations in four sections. In the first section, School Facility Planning, Policies, and Procedures, school building is proposed as an integral part of shared community…

  5. Doing Planning and Task Performance in Second Language Acquisition: An Ethnomethodological Respecification

    ERIC Educational Resources Information Center

    Markee, Numa; Kunitz, Silvia

    2013-01-01

    We use insights and methods from ethnomethodological conversation analysis and discursive psychology to develop an account of embodied word and grammar searches as socially distributed planning practices. These practices, which were produced by three intermediate learners of Italian as a Foreign Language (IFL), occurred massively in natural data…

  6. 77 FR 74662 - Federal Acquisition Regulation; Submission for OMB Review; Accident Prevention Plans and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-17

    ... and Recordkeeping. A notice was published in the Federal Register at 77 FR 56645 on September 13, 2012... Burden The estimated reporting burden has been adjusted since published in the Federal Register at 74 FR... NE., Washington, DC 20417. ATTN: Hada Flowers/IC 9000-0060, Accident Prevention Plans...

  7. Study of solid rocket motors for a space shuttle booster. Volume 3: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    Vonderesch, A. H.

    1972-01-01

    Plans for conducting Phase C/D for a solid rocket motor booster vehicle are presented. Methods for conducting this program with details of scheduling, testing, and program management and control are included. The requirements of the space shuttle program to deliver a minimum cost/maximum reliability booster vehicle are examined.

  8. 48 CFR 252.204-7004 - Alternate A, Central Contractor Registration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Alternate A, Central Contractor Registration. 252.204-7004 Section 252.204-7004 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND...

  9. 48 CFR 52.204-9 - Personal Identity Verification of Contractor Personnel.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Personal Identity Verification of Contractor Personnel. 52.204-9 Section 52.204-9 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52.204-9...

  10. 48 CFR 252.247-7016 - Contractor liability for loss or damage.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor liability for loss or damage. 252.247-7016 Section 252.247-7016 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions And...

  11. 48 CFR 252.247-7016 - Contractor liability for loss or damage.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor liability for loss or damage. 252.247-7016 Section 252.247-7016 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions And...

  12. 48 CFR 46.202-2 - Government reliance on inspection by contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Government reliance on inspection by contractor. 46.202-2 Section 46.202-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-2...

  13. 48 CFR 52.225-26 - Contractors Performing Private Security Functions Outside the United States.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Contractors Performing Private Security Functions Outside the United States. 52.225-26 Section 52.225-26 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions...

  14. 48 CFR 252.227-7038 - Patent Rights-Ownership by the Contractor (Large Business).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Patent Rights-Ownership by the Contractor (Large Business). 252.227-7038 Section 252.227-7038 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of...

  15. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Performance of work by the contractor. 36.501 Section 36.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses...

  16. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Performance of work by the contractor. 36.501 Section 36.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses...

  17. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Performance of work by the contractor. 36.501 Section 36.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses...

  18. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance of work by the contractor. 36.501 Section 36.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses...

  19. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Performance of work by the contractor. 36.501 Section 36.501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses...

  20. 48 CFR 237.173 - Prohibition on interrogation of detainees by contractor personnel.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Prohibition on interrogation of detainees by contractor personnel. 237.173 Section 237.173 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF...

  1. 48 CFR 237.171 - Training for contractor personnel interacting with detainees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Training for contractor personnel interacting with detainees. 237.171 Section 237.171 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING SERVICE...

  2. 48 CFR 237.171 - Training for contractor personnel interacting with detainees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Training for contractor personnel interacting with detainees. 237.171 Section 237.171 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING SERVICE...

  3. 48 CFR 237.173 - Prohibition on interrogation of detainees by contractor personnel.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Prohibition on interrogation of detainees by contractor personnel. 237.173 Section 237.173 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF...

  4. 48 CFR 237.173 - Prohibition on interrogation of detainees by contractor personnel.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Prohibition on interrogation of detainees by contractor personnel. 237.173 Section 237.173 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF...

  5. 48 CFR 237.171 - Training for contractor personnel interacting with detainees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Training for contractor personnel interacting with detainees. 237.171 Section 237.171 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING SERVICE...

  6. 48 CFR 237.173 - Prohibition on interrogation of detainees by contractor personnel.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Prohibition on interrogation of detainees by contractor personnel. 237.173 Section 237.173 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF...

  7. 48 CFR 237.171 - Training for contractor personnel interacting with detainees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Training for contractor personnel interacting with detainees. 237.171 Section 237.171 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING SERVICE...

  8. 48 CFR 237.171 - Training for contractor personnel interacting with detainees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Training for contractor personnel interacting with detainees. 237.171 Section 237.171 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING SERVICE...

  9. 48 CFR 252.225-7039 - Contractors performing private security functions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractors performing private security functions. 252.225-7039 Section 252.225-7039 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions...

  10. 48 CFR 236.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTS Special Aspects of Contracting for Construction 236.201 Evaluation of contractor performance. (a) Preparation of performance evaluation reports. Use DD Form 2626, Performance Evaluation (Construction... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Evaluation of...

  11. 48 CFR 970.5203-3 - Contractor's organization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Officer a chart showing the names, duties, and organization of key personnel (see 48 CFR 952.215-70) to be... requirements set forth in 48 CFR 970.0371. Such standards and procedures shall be subject to the approval of... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's...

  12. 48 CFR 919.7006 - Incentives for DOE contractor participation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Incentives for DOE....7006 Incentives for DOE contractor participation. (a) Under cost-plus-award fee contracts, approved... and small business concerns owned and controlled by service disabled veterans. DOE may evaluate...

  13. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... notify the contracting officer when an employee no longer requires access to DOT computer systems due to....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Qualifications...

  14. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Accounting Standards under 41 U.S.C. chapter 15, as implemented in regulations found at 48 CFR 9903.201-1... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor business system... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES...

  15. 3D model acquisition, design, planning, and manufacturing of orthopaedic devices: a framework

    NASA Astrophysics Data System (ADS)

    Kidder, Justin R.; Mason, Emily; Nnaji, Bartholomew O.

    1996-12-01

    Design and manufacture of orthopedic devices using rapid prototyping technologies has been until recently a highly iterative process that involves multiple users, including doctors, design engineers and rapid prototyping experts. Existing systems for creation of orthopedic parts through rapid prototyping do not follow the principles of concurrent engineering and design for manufacture. This leads to excessive communication between parties and delays in product realization time. In this paper, we lay out the framework for a unified expert system that will enable a doctor to create quickly and easily fully functional prosthetics and orthopedic implants. Necessary components of the model acquisition process should include volumetric segmentation of objects from a CT or MRI dataset and NURBS surface fitting to the boundary points. Finite element analysis and surface model modification modules are also needed, but should be provided in an intuitive fashion for doctors who are not experienced in computer aided design. Preprocessing for rapid prototype building should be automatic, and should include optimal orientation, support structure generation and build simulation modules. Finally, the model should be passed to the rapid prototyping machine in a presliced format for speed and accuracy.

  16. 48 CFR 252.247-7016 - Contractor liability for loss or damage.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... loss or damage. 252.247-7016 Section 252.247-7016 Federal Acquisition Regulations System DEFENSE... CLAUSES Text of Provisions And Clauses 252.247-7016 Contractor liability for loss or damage. As prescribed in 247.270-3(k), use the following clause: Contractor Liability for Loss or Damage (DEC 1991)...

  17. 48 CFR 252.247-7016 - Contractor liability for loss or damage.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... loss or damage. 252.247-7016 Section 252.247-7016 Federal Acquisition Regulations System DEFENSE... CLAUSES Text of Provisions And Clauses 252.247-7016 Contractor liability for loss or damage. As prescribed in 247.270-3(k), use the following clause: Contractor Liability for Loss or Damage (DEC 1991)...

  18. 48 CFR 252.247-7016 - Contractor liability for loss or damage.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... loss or damage. 252.247-7016 Section 252.247-7016 Federal Acquisition Regulations System DEFENSE... CLAUSES Text of Provisions And Clauses 252.247-7016 Contractor liability for loss or damage. As prescribed in 247.270-3(k), use the following clause: Contractor Liability for Loss or Damage (DEC 1991)...

  19. 48 CFR 352.222-70 - Contractor cooperation in equal employment opportunity investigations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Opportunity (EEO) complaints processed pursuant to 29 CFR Part 1614. For purposes of this clause, the... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contractor cooperation in... Texts of Provisions and Clauses 352.222-70 Contractor cooperation in equal employment...

  20. 48 CFR 352.222-70 - Contractor cooperation in equal employment opportunity investigations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Opportunity (EEO) complaints processed pursuant to 29 CFR Part 1614. For purposes of this clause, the... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Contractor cooperation in... Texts of Provisions and Clauses 352.222-70 Contractor cooperation in equal employment...

  1. 48 CFR 352.222-70 - Contractor cooperation in equal employment opportunity investigations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Opportunity (EEO) complaints processed pursuant to 29 CFR Part 1614. For purposes of this clause, the... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Contractor cooperation in... Texts of Provisions and Clauses 352.222-70 Contractor cooperation in equal employment...

  2. 48 CFR 352.222-70 - Contractor cooperation in equal employment opportunity investigations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Opportunity (EEO) complaints processed pursuant to 29 CFR Part 1614. For purposes of this clause, the... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Contractor cooperation in... Texts of Provisions and Clauses 352.222-70 Contractor cooperation in equal employment...

  3. 48 CFR 1552.235-79 - Release of contractor confidential business information (APR 1996).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... entitled to confidential treatment under existing Agency regulations (40 CFR part 2) may be included in the... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Release of contractor... Texts of Provisions and Clauses 1552.235-79 Release of contractor confidential business information...

  4. 48 CFR 1552.235-79 - Release of contractor confidential business information (APR 1996).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... entitled to confidential treatment under existing Agency regulations (40 CFR part 2) may be included in the... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Release of contractor... Texts of Provisions and Clauses 1552.235-79 Release of contractor confidential business information...

  5. 48 CFR 52.204-9 - Personal Identity Verification of Contractor Personnel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Personal Identity... Provisions and Clauses 52.204-9 Personal Identity Verification of Contractor Personnel. As prescribed in 4.1303, insert the following clause: Personal Identity Verification of Contractor Personnel (SEP 2007)...

  6. 48 CFR 1852.245-73 - Financial reporting of NASA property in the custody of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Financial reporting of NASA... CONTRACT CLAUSES Texts of Provisions and Clauses 1852.245-73 Financial reporting of NASA property in the... of NASA Property in the Custody of Contractors (OCT 2003) (a) The Contractor shall submit annually...

  7. 48 CFR 52.203-13 - Contractor Code of Business Ethics and Conduct.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Business Ethics and Conduct. 52.203-13 Section 52.203-13 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.203-13 Contractor Code of Business Ethics and Conduct. As prescribed in 3.1004(a), insert the following clause: Contractor Code of Business Ethics and Conduct (APR 2010) (a)...

  8. 48 CFR 1845.604 - Restrictions on purchase or retention of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Restrictions on purchase or... AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 1845.604 Restrictions on purchase or retention of contractor inventory....

  9. 48 CFR 52.203-13 - Contractor Code of Business Ethics and Conduct.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Business Ethics and Conduct. 52.203-13 Section 52.203-13 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.203-13 Contractor Code of Business Ethics and Conduct. As prescribed in 3.1004(a), insert the following clause: Contractor Code of Business Ethics and Conduct (APR 2010) (a)...

  10. 48 CFR 52.203-13 - Contractor Code of Business Ethics and Conduct.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Business Ethics and Conduct. 52.203-13 Section 52.203-13 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.203-13 Contractor Code of Business Ethics and Conduct. As prescribed in 3.1004(a), insert the following clause: Contractor Code of Business Ethics and Conduct (APR 2010) (a)...

  11. 48 CFR 52.203-13 - Contractor Code of Business Ethics and Conduct.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Business Ethics and Conduct. 52.203-13 Section 52.203-13 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.203-13 Contractor Code of Business Ethics and Conduct. As prescribed in 3.1004(a), insert the following clause: Contractor Code of Business Ethics and Conduct (APR 2010) (a)...

  12. 48 CFR 52.203-13 - Contractor Code of Business Ethics and Conduct.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Business Ethics and Conduct. 52.203-13 Section 52.203-13 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.203-13 Contractor Code of Business Ethics and Conduct. As prescribed in 3.1004(a), insert the following clause: Contractor Code of Business Ethics and Conduct (APR 2010) (a)...

  13. 48 CFR 225.7303-1 - Contractor sales to other foreign customers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... foreign customers. 225.7303-1 Section 225.7303-1 Federal Acquisition Regulations System DEFENSE... for Foreign Military Sales 225.7303-1 Contractor sales to other foreign customers. If the contractor has made sales of the item required for the foreign military sale to foreign customers...

  14. 48 CFR 52.247-14 - Contractor Responsibility for Receipt of Shipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for Receipt of Shipment. 52.247-14 Section 52.247-14 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.247-14 Contractor Responsibility for Receipt of Shipment. As prescribed in 47.207-5... transportation-related services: Contractor Responsibility for Receipt of Shipment (APR 1984) The...

  15. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract... disseminating personal information. The record system affected is considered to be maintained by the Air Force... the record system number, as required by the Defense Acquisition Regulation and this part....

  16. 48 CFR 1529.303 - Application of State and local taxes to Government contractors and subcontractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... local taxes to Government contractors and subcontractors. 1529.303 Section 1529.303 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL CONTRACTING REQUIREMENTS TAXES State and Local Taxes 1529.303 Application of State and local taxes to Government contractors and...

  17. 48 CFR 1529.303 - Application of State and local taxes to Government contractors and subcontractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... local taxes to Government contractors and subcontractors. 1529.303 Section 1529.303 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL CONTRACTING REQUIREMENTS TAXES State and Local Taxes 1529.303 Application of State and local taxes to Government contractors and...

  18. 48 CFR 1529.303 - Application of State and local taxes to Government contractors and subcontractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... local taxes to Government contractors and subcontractors. 1529.303 Section 1529.303 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL CONTRACTING REQUIREMENTS TAXES State and Local Taxes 1529.303 Application of State and local taxes to Government contractors and...

  19. 48 CFR 1529.303 - Application of State and local taxes to Government contractors and subcontractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... local taxes to Government contractors and subcontractors. 1529.303 Section 1529.303 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL CONTRACTING REQUIREMENTS TAXES State and Local Taxes 1529.303 Application of State and local taxes to Government contractors and...

  20. 48 CFR 1529.303 - Application of State and local taxes to Government contractors and subcontractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... local taxes to Government contractors and subcontractors. 1529.303 Section 1529.303 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL CONTRACTING REQUIREMENTS TAXES State and Local Taxes 1529.303 Application of State and local taxes to Government contractors and...

  1. 48 CFR 42.1205 - Agreement to recognize contractor's change of name.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Novation and Change-of... of the Contractor under the contracts are unaffected by this change. (4) Documentary evidence of...

  2. 76 FR 27648 - Submission for OMB Review; Preventing Personal Conflicts of Interest for Contractor Employees...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ...; Preventing Personal Conflicts of Interest for Contractor Employees Performing Acquisition Functions AGENCY... approve a new information collection requirement regarding Preventing Personal Conflicts of Interest for..., 2011. ADDRESSES: Submit comments identified by Information Collection 9000- 00XX, Preventing...

  3. Contingency contractor optimization. Phase 3, model description and formulation.

    SciTech Connect

    Gearhart, Jared Lee; Adair, Kristin Lynn; Jones, Katherine A.; Bandlow, Alisa; Durfee, Justin D.; Jones, Dean A.; Martin, Nathaniel; Detry, Richard Joseph; Nanco, Alan Stewart; Nozick, Linda Karen

    2013-10-01

    The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

  4. Contingency contractor optimization. phase 3, model description and formulation.

    SciTech Connect

    Gearhart, Jared Lee; Adair, Kristin Lynn; Jones, Katherine A.; Bandlow, Alisa; Detry, Richard Joseph; Durfee, Justin D.; Jones, Dean A.; Martin, Nathaniel; Nanco, Alan Stewart; Nozick, Linda Karen

    2013-06-01

    The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

  5. 78 FR 22841 - Defense Federal Acquisition Regulation Supplement: Encouragement of Science, Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ...DoD hereby provides notice of the cancellation of a proposed rule without further action. DoD has determined that the proposed amendment to the Defense Federal Acquisition Regulation Supplement (DFARS) is not a necessary part of the Department's plan to implement a section of the National Defense Authorization Act for Fiscal Year 2012, that requires DoD to encourage contractors to develop......

  6. Tracking and data acquisition system for the 1990's. Volume 8: TDAS frequency planning

    NASA Technical Reports Server (NTRS)

    Heppe, S. B.; Elrod, B. D.

    1983-01-01

    Current planning calls for the TDAS to support new user and crosslink services, in addition to TDRSS-compatible services. TDRSS-compatible services would operate in current S-band and K-band channels used by TDRSS. New services, however, can take advantage of technology advances at microwave and optical frequencies. For augmented space-to-space services, 60 GHz and GaAs laser systems offer technical advantages, relative freedom from RFI, and a benign regulatory environment (i.e., minimal congestion and, in the case of 60 GHz, maximum regulatory support for TDAS-type services). For TDAS Earth-to-space and space-to-Earth services, the 30/20 GHz band offers the best mix of technical and regulatory advantages. But use of these bands would have to be coordinated with the U.S. military.

  7. Acquisition strategies

    SciTech Connect

    Zimmer, M.J.; Lynch, P.W. )

    1993-11-01

    Acquiring projects takes careful planning, research and consideration. Picking the right opportunities and avoiding the pitfalls will lead to a more valuable portfolio. This article describes the steps to take in evaluating an acquisition and what items need to be considered in an evaluation.

  8. Augmentative and Alternative Communication for Children with Autism Spectrum Disorder: An Evidence-Based Evaluation of the Language Acquisition through Motor Planning (LAMP) Programme

    ERIC Educational Resources Information Center

    Bedwani, Mary-Ann Naguib; Bruck, Susan; Costley, Debra

    2015-01-01

    Children diagnosed with autism spectrum disorder often have restricted verbal communication. For children who do not use functional speech, augmentative and alternative communication (AAC) devices can be an important support. We evaluated the effectiveness of one AAC programme, the Language Acquisition through Motor Planning (LAMP) using a Vantage…

  9. 48 CFR 307.104-70 - Acquisition strategy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Acquisition strategy. 307.104-70 Section 307.104-70 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Planning 307.104-70 Acquisition strategy. Program and Project Managers responsible...

  10. 48 CFR 307.104-70 - Acquisition strategy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Acquisition strategy. 307... AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Planning 307.104-70 Acquisition strategy... designated by the HHS CIO, DASFMP, the CAO, or the cognizant HCA) shall prepare an acquisition strategy...

  11. 48 CFR 307.104-70 - Acquisition strategy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Acquisition strategy. 307... AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Planning 307.104-70 Acquisition strategy... designated by the HHS CIO, DASFMP, the CAO, or the cognizant HCA) shall prepare an acquisition strategy...

  12. 48 CFR 307.104-70 - Acquisition strategy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Acquisition strategy. 307... AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Planning 307.104-70 Acquisition strategy... designated by the HHS CIO, DASFMP, the CAO, or the cognizant HCA) shall prepare an acquisition strategy...

  13. 48 CFR 307.104-70 - Acquisition strategy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Acquisition strategy. 307... AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Planning 307.104-70 Acquisition strategy... designated by the HHS CIO, DASFMP, the CAO, or the cognizant HCA) shall prepare an acquisition strategy...

  14. Test plan for the data acquisition and management system for monitoring the fuel oil spill at the Sandia National Laboratories installation in Livermore, California

    SciTech Connect

    Widing, M.A.; Dominiak, D.M.; Leser, C.C.; Peerenboom, J.P.; Manning, J.F.

    1995-04-01

    This report describes the formal test plan that will be used for the data acquisition and management system developed to monitor a bioremediation study by Argonne National Laboratory in association with Sandia National Laboratories. The data acquisition and management system will record the site data during the bioremediation and assist experts in site analysis. The three major subsystems of this system are described in detail in this report. In addition, this report documents the component- and system-level test procedures that will be implemented at each phase of the project. Results of these test procedures are documented in this report.

  15. Debarment and suspension. [of contractors

    NASA Technical Reports Server (NTRS)

    Whelan, Thomas J.

    1987-01-01

    The changing Government attitude toward contractor debarment and suspension is examined, with emphasis on the fact that the Government is more alert to fraud, waste, and abuse. Consideration is given to causes of debarment or suspension, procedures and due process hearings, settlement agreements, compliance programs, and recent related legislation. It is concluded that the change in the Government contracting environment in recent years should be sufficient incentive for contractors to monitor their operations more closely.

  16. 48 CFR 627.203 - Patent indemnification of Government by contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Patent indemnification of Government by contractor. 627.203 Section 627.203 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents 627.203 Patent indemnification of Government by...

  17. 48 CFR 627.203 - Patent indemnification of Government by contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Patent indemnification of Government by contractor. 627.203 Section 627.203 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents 627.203 Patent indemnification of Government by...

  18. 48 CFR 1845.7101-4 - Types of deletions from contractor property records.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Types of deletions from contractor property records. 1845.7101-4 Section 1845.7101-4 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Forms Preparation 1845.7101-4 Types of deletions from...

  19. 48 CFR 1845.7101-4 - Types of deletions from contractor property records.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Types of deletions from contractor property records. 1845.7101-4 Section 1845.7101-4 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Forms Preparation 1845.7101-4 Types of deletions from...

  20. 48 CFR 245.603-71 - Disposal of contractor inventory for NATO cooperative projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Disposal of contractor inventory for NATO cooperative projects. 245.603-71 Section 245.603-71 Federal Acquisition Regulations... inventory for NATO cooperative projects. (a) North Atlantic Treaty Organization (NATO) cooperative...

  1. 48 CFR 1552.235-79 - Release of contractor confidential business information (APR 1996).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Release of contractor confidential business information (APR 1996). 1552.235-79 Section 1552.235-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses...

  2. 48 CFR 1552.235-79 - Release of contractor confidential business information (APR 1996).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Release of contractor confidential business information (APR 1996). 1552.235-79 Section 1552.235-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses...

  3. 48 CFR 53.301-1406 - Preaward Survey of Prospective Contractor-Quality Assurance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Preaward Survey of Prospective Contractor-Quality Assurance. 53.301-1406 Section 53.301-1406 Federal Acquisition Regulations...-1406 Preaward Survey of Prospective Contractor—Quality Assurance. ER09DE97.000 ER09DE97.001...

  4. 48 CFR 852.236-72 - Performance of work by the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Performance of work by the contractor. 852.236-72 Section 852.236-72 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses 852.236-72 Performance of work by...

  5. 48 CFR 203.171 - Senior DoD officials seeking employment with defense contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Senior DoD officials seeking employment with defense contractors. 203.171 Section 203.171 Federal Acquisition Regulations... AND PERSONAL CONFLICTS OF INTEREST Safeguards 203.171 Senior DoD officials seeking employment...

  6. 48 CFR 203.171 - Senior DoD officials seeking employment with defense contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Senior DoD officials seeking employment with defense contractors. 203.171 Section 203.171 Federal Acquisition Regulations... AND PERSONAL CONFLICTS OF INTEREST Safeguards 203.171 Senior DoD officials seeking employment...

  7. 48 CFR 203.171 - Senior DoD officials seeking employment with defense contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Senior DoD officials seeking employment with defense contractors. 203.171 Section 203.171 Federal Acquisition Regulations... AND PERSONAL CONFLICTS OF INTEREST Safeguards 203.171 Senior DoD officials seeking employment...

  8. 48 CFR 203.171 - Senior DoD officials seeking employment with defense contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Senior DoD officials seeking employment with defense contractors. 203.171 Section 203.171 Federal Acquisition Regulations... AND PERSONAL CONFLICTS OF INTEREST Safeguards 203.171 Senior DoD officials seeking employment...

  9. 48 CFR 203.171 - Senior DoD officials seeking employment with defense contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Senior DoD officials seeking employment with defense contractors. 203.171 Section 203.171 Federal Acquisition Regulations... AND PERSONAL CONFLICTS OF INTEREST Safeguards 203.171 Senior DoD officials seeking employment...

  10. 48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent rights-retention by the contractor (short form). 952.227-11 Section 952.227-11 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.227-11 Patent...

  11. 48 CFR 1322.101-4 - Removal of items from contractors' facilities affected by work stoppages.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Removal of items from contractors' facilities affected by work stoppages. 1322.101-4 Section 1322.101-4 Federal Acquisition... stoppages. The contracting officer shall obtain approval from the head of the contracting office and...

  12. 48 CFR 1322.101-4 - Removal of items from contractors' facilities affected by work stoppages.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Removal of items from contractors' facilities affected by work stoppages. 1322.101-4 Section 1322.101-4 Federal Acquisition... stoppages. The contracting officer shall obtain approval from the head of the contracting office and...

  13. 48 CFR 53.301-1407 - Preaward Survey of Prospective Contractor-Financial Capability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Preaward Survey of Prospective Contractor-Financial Capability. 53.301-1407 Section 53.301-1407 Federal Acquisition Regulations...-1407 Preaward Survey of Prospective Contractor—Financial Capability. EC01MY91.090 EC01MY91.091...

  14. 48 CFR 53.301-1408 - Preaward Survey of Prospective Contractor-Accounting System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Preaward Survey of Prospective Contractor-Accounting System. 53.301-1408 Section 53.301-1408 Federal Acquisition Regulations...-1408 Preaward Survey of Prospective Contractor—Accounting System. EC01MY91.093 EC01MY91.094...

  15. 48 CFR 53.301-1404 - Preaward Survey of Prospective Contractor-Technical.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Preaward Survey of Prospective Contractor-Technical. 53.301-1404 Section 53.301-1404 Federal Acquisition Regulations System... Preaward Survey of Prospective Contractor—Technical. EC01MY91.083...

  16. 48 CFR 970.0371-7 - Outside employment of contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Outside employment of contractor employees. 970.0371-7 Section 970.0371-7 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of...

  17. 48 CFR 245.604 - Restrictions on purchase or retention of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Restrictions on purchase... DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 245.604 Restrictions on purchase...

  18. 48 CFR 627.203 - Patent indemnification of Government by contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Patent indemnification of Government by contractor. 627.203 Section 627.203 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents 627.203 Patent indemnification...

  19. 48 CFR 627.203 - Patent indemnification of Government by contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Patent indemnification of Government by contractor. 627.203 Section 627.203 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents 627.203 Patent indemnification...

  20. 48 CFR 1846.671 - Contract quality assurance on shipments between contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Contract quality assurance on shipments between contractors. 1846.671 Section 1846.671 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Material Inspection and Receiving Reports 1846.671...

  1. 48 CFR 1846.671 - Contract quality assurance on shipments between contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract quality assurance on shipments between contractors. 1846.671 Section 1846.671 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Material Inspection and Receiving Reports 1846.671 Contract...

  2. 48 CFR 1846.671 - Contract quality assurance on shipments between contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contract quality assurance on shipments between contractors. 1846.671 Section 1846.671 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Material Inspection and Receiving Reports 1846.671...

  3. 48 CFR 2109.7001 - Minimum standards for FEGLI Program contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION ACQUISITION... part 2149 of this chapter. (b) The contractor must actually be engaged in the life insurance business and must be licensed to transact life and accidental death and dismemberment insurance under the...

  4. 48 CFR 652.228-70 - Defense Base Act-Covered Contractor Employees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Department of State and the Department's Defense Base Act insurance carrier at the rates specified in DOSAR... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Defense Base Act-Covered Contractor Employees. 652.228-70 Section 652.228-70 Federal Acquisition Regulations System DEPARTMENT...

  5. 48 CFR 652.228-70 - Defense Base Act-Covered Contractor Employees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Department of State and the Department's Defense Base Act insurance carrier at the rates specified in DOSAR... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Defense Base Act-Covered Contractor Employees. 652.228-70 Section 652.228-70 Federal Acquisition Regulations System DEPARTMENT...

  6. 48 CFR 652.228-70 - Defense Base Act-Covered Contractor Employees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Department of State and the Department's Defense Base Act insurance carrier at the rates specified in DOSAR... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Defense Base Act-Covered Contractor Employees. 652.228-70 Section 652.228-70 Federal Acquisition Regulations System DEPARTMENT...

  7. 48 CFR 652.228-70 - Defense Base Act-Covered Contractor Employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Department of State and the Department's Defense Base Act insurance carrier at the rates specified in DOSAR... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Defense Base Act-Covered Contractor Employees. 652.228-70 Section 652.228-70 Federal Acquisition Regulations System DEPARTMENT...

  8. 48 CFR 203.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Disclosure, protection, and marking of contractor bid or proposal information and source selection information. 203.104-4 Section 203.104-4 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL IMPROPER BUSINESS...

  9. Fly ash construction manual for road and site applications: Volume 2, Contractor's guide: Final report

    SciTech Connect

    Glogowski, P.E.; Kelly, J.M.; Curry, M.A.

    1988-10-01

    This two-volume manual presents information for the specification writer or contractor planning to use coal fly ash in the following applications: Fills, Embankments, and Backfills; Subgrade Stabilization; Pavement Base Course; Slurry Backfill; Soil Amendment. This document, Volume 2, ''Contractor's Guide,'' contains information directed toward contractors that describes equipment selection criteria and proper construction techniques. Sample specifications are included as appendices to each volume. 29 refs., 23 figs., 1 tab.

  10. Environmental Program Description for the Tank Farm Contractor

    SciTech Connect

    POWELL, P.A.

    2001-01-02

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety and Health Management System Description for the Tank Farm Contractor (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of five core functions. Each section of this plan describes the activities (formerly known as the Tank Waste Remediation System) of the Tank Farm Contractor (TFC) environmental organization according to the following core functions: Perform Work within Controls; Establish Environmental Policy and Define Work Scope; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; an Provide Feedback and Continuous Improvement.

  11. 48 CFR 22.1503 - Procedures for acquiring end products on the List of Products Requiring Contractor Certification...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... end products on the List of Products Requiring Contractor Certification as to Forced or Indentured... Acquisition of Products Produced by Forced or Indentured Child Labor 22.1503 Procedures for acquiring end products on the List of Products Requiring Contractor Certification as to Forced or Indentured Child...

  12. 48 CFR 22.1503 - Procedures for acquiring end products on the List of Products Requiring Contractor Certification...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... end products on the List of Products Requiring Contractor Certification as to Forced or Indentured... Acquisition of Products Produced by Forced or Indentured Child Labor 22.1503 Procedures for acquiring end products on the List of Products Requiring Contractor Certification as to Forced or Indentured Child...

  13. 48 CFR 22.1503 - Procedures for acquiring end products on the List of Products Requiring Contractor Certification...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... end products on the List of Products Requiring Contractor Certification as to Forced or Indentured... Acquisition of Products Produced by Forced or Indentured Child Labor 22.1503 Procedures for acquiring end products on the List of Products Requiring Contractor Certification as to Forced or Indentured Child...

  14. 48 CFR 22.1503 - Procedures for acquiring end products on the List of Products Requiring Contractor Certification...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... end products on the List of Products Requiring Contractor Certification as to Forced or Indentured... Acquisition of Products Produced by Forced or Indentured Child Labor 22.1503 Procedures for acquiring end products on the List of Products Requiring Contractor Certification as to Forced or Indentured Child...

  15. 48 CFR 53.303-WH-347 - Department of Labor Form WH-347, Payroll (For Contractor's Optional Use).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Department of Labor Form WH-347, Payroll (For Contractor's Optional Use). 53.303-WH-347 Section 53.303-WH-347 Federal... Illustrations of Forms 53.303-WH-347 Department of Labor Form WH-347, Payroll (For Contractor's Optional...

  16. 48 CFR 53.303-WH-347 - Department of Labor Form WH-347, Payroll (For Contractor's Optional Use).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Department of Labor Form WH-347, Payroll (For Contractor's Optional Use). 53.303-WH-347 Section 53.303-WH-347 Federal... Illustrations of Forms 53.303-WH-347 Department of Labor Form WH-347, Payroll (For Contractor's Optional...

  17. 48 CFR 53.303-WH-347 - Department of Labor Form WH-347, Payroll (For Contractor's Optional Use).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Department of Labor Form WH-347, Payroll (For Contractor's Optional Use). 53.303-WH-347 Section 53.303-WH-347 Federal... Illustrations of Forms 53.303-WH-347 Department of Labor Form WH-347, Payroll (For Contractor's Optional...

  18. 48 CFR 53.303-WH-347 - Department of Labor Form WH-347, Payroll (For Contractor's Optional Use).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Department of Labor Form WH-347, Payroll (For Contractor's Optional Use). 53.303-WH-347 Section 53.303-WH-347 Federal... Illustrations of Forms 53.303-WH-347 Department of Labor Form WH-347, Payroll (For Contractor's Optional...

  19. 10 CFR 436.32 - Qualified contractors lists.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... list of parties excluded from procurement programs under 48 CFR part 9, subpart 9.4; and (5) There is... 10 Energy 3 2010-01-01 2010-01-01 false Qualified contractors lists. 436.32 Section 436.32 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Methods...

  20. 77 FR 22312 - Access by EPA Contractors to Confidential Business Information Related to the Greenhouse Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ...EPA's Office of Atmospheric Programs plans to authorize the contractors named in this notice to access information submitted to EPA under the Greenhouse Gas Reporting Program that may be designated or claimed as confidential business information. Contractor access to this information will begin no sooner than April 19,...

  1. 76 FR 52659 - Access by EPA Contractors to Confidential Business Information (CBI) Related to the Greenhouse...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ...EPA's Office of Atmospheric Programs plans to authorize the contractors named in this notice to access information that will be submitted to EPA under the Greenhouse Gas Reporting Program that may be designated or claimed as confidential business information. Contractor access to this information will begin on August 29,...

  2. Evaluation Criteria to Deliverables Crosswalk for the Tank Farm Contractor (Supercedes HNF-2020)

    SciTech Connect

    WOJTASEK, R.D.

    2000-04-24

    Before the Office of River Protection can authorize proceeding with Phase 1B, the Tank Farm Contractor (TFC) must demonstrate readiness to retrieve and deliver the waste to the privatization contractor and to receive and dispose of the products and by-products returned from treatment. The TFC has organized their plans for providing these support services into the within the River Protection Project.

  3. 75 FR 19827 - Acquisition Regulation Rewrite

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ...The Department of the Interior (DOI) is taking interim final action on administrative changes to the Department of the Interior Acquisition Regulation (DIAR). This action revises the DIAR, 48 CFR Chapter 14, but does not impose any new requirements on DOI contractors. The revisions in this interim final rule will make minor corrections to and streamline DOI acquisition processes to be......

  4. 48 CFR 3052.212-70 - Contract Terms and Conditions Applicable to DHS Acquisition of Commercial Items.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CFR 3012.301, insert the following clause: Contract Terms and Conditions Applicable to DHS Acquisition... Contractor Disclosure of Violations. __3052.204-70Security Requirements for Unclassified Information Technology Resources. __3052.204-71Contractor Employee Access. __Alternate I...

  5. 48 CFR 3052.212-70 - Contract Terms and Conditions Applicable to DHS Acquisition of Commercial Items.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CFR 3012.301, insert the following clause: Contract Terms and Conditions Applicable to DHS Acquisition... Contractor Disclosure of Violations. __3052.204-70Security Requirements for Unclassified Information Technology Resources. __3052.204-71Contractor Employee Access. __Alternate I...

  6. 48 CFR 3052.212-70 - Contract Terms and Conditions Applicable to DHS Acquisition of Commercial Items.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CFR 3012.301, insert the following clause: Contract Terms and Conditions Applicable to DHS Acquisition... Contractor Disclosure of Violations. __3052.204-70Security Requirements for Unclassified Information Technology Resources. __3052.204-71Contractor Employee Access. __Alternate I...

  7. 78 FR 46783 - Federal Acquisition Regulation; Documenting Contractor Performance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... Federal Register at 76 FR 37704 on June 28, 2011, under FAR Case 2009-042, to implement recommendations..., 2009). Two amendments to the proposed rule were published in the Federal Register at 76 FR 48776 on August 9, 2011, and at 76 FR 50714 on August 16, 2011. Twenty three respondents submitted comments on...

  8. 77 FR 54864 - Federal Acquisition Regulation; Documenting Contractor Performance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ... INFORMATION: I. Background DoD, GSA, and NASA published a proposed rule in the Federal Register at 76 FR 37704... Federal Register notice were published (76 FR 48776, dated August 9, 2011, and 76 FR 50714, dated August... addresses all comments received in response to the proposed rule published in the Federal Register at 76...

  9. 76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... to report their evaluations into the Governmentwide Past Performance Information Retrieval System... of FAR 42.1502 to move the language in paragraph (a) ``The content of the evaluations should be... the FAR existing guidelines and practices. The evaluation factors and rating system language...

  10. 76 FR 50714 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... Performance. DATES: The comment period for the proposed rule published June, 28, 2011, at 76 FR 37704, is... proposed rule FR Doc. 2011-20089, beginning on page 48776, in the 2nd column, in the issue of August 9... ``September 29, 2011'' in its place. Hada Flowers, Division Director, Regulatory Secretariat, Office...

  11. The Dreyfus Model of Skill Acquisition: A Career Development Framework for Succession Planning and Management in Academic Libraries

    ERIC Educational Resources Information Center

    Hall-Ellis, Sylvia D.; Grealy, Deborah S.

    2013-01-01

    Succession planning and management are critical parts of strategic planning for libraries in the twenty-first century. Making certain that the right people are in place with the prerequisite training and experience to assume leadership positions is a vital part of strategic planning and talent management in libraries that rely on teams of people…

  12. 48 CFR 12.301 - Solicitation provisions and contract clauses for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and contract clauses for the acquisition of commercial items. 12.301 Section 12.301 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Solicitation Provisions and Contract Clauses for the Acquisition of Commercial Items...

  13. 45 CFR 5b.12 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Contractors. 5b.12 Section 5b.12 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION PRIVACY ACT REGULATIONS § 5b.12 Contractors. (a) All contracts entered into on or after September 27, 1975 which require a contractor to...

  14. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a...

  15. 7 CFR 1726.27 - Contractor's bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall...

  16. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a...

  17. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a...

  18. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a...

  19. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a...

  20. Space plasma contractor research, 1988

    NASA Technical Reports Server (NTRS)

    Williams, John D.; Wilbur, Paul J.

    1989-01-01

    Results of experiments conducted on hollow cathode-based plasma contractors are reported. Specific tests in which attempts were made to vary plasma conditions in the simulated ionospheric plasma are described. Experimental results showing the effects of contractor flowrate and ion collecting surface size on contactor performance and contactor plasma plume geometry are presented. In addition to this work, one-dimensional solutions to spherical and cylindircal space-charge limited double-sheath problems are developed. A technique is proposed that can be used to apply these solutions to the problem of current flow through elongated double-sheaths that separate two cold plasmas. Two conference papers which describe the essential features of the plasma contacting process and present data that should facilitate calibration of comprehensive numerical models of the plasma contacting process are also included.

  1. 76 FR 10476 - (General Provisions) Contract Appeals and the Acquisition Regulation: General, Acquisition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-25

    ... 1991-AB81 (General Provisions) Contract Appeals and the Acquisition Regulation: General, Acquisition Planning, and Contracting Methods and Contract Types Correction In rule document 2011-1320 appearing...

  2. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of...

  3. 48 CFR 970.5227-12 - Patent rights-management and operating contracts, for-profit contractor, advance class waiver.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent rights-management and operating contracts, for-profit contractor, advance class waiver. 970.5227-12 Section 970.5227-12 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS...

  4. 48 CFR 970.5227-12 - Patent rights-management and operating contracts, for-profit contractor, advance class waiver.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Patent rights-management and operating contracts, for-profit contractor, advance class waiver. 970.5227-12 Section 970.5227-12 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS...

  5. 48 CFR 603.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Disclosure, protection, and marking of contractor bid or proposal information and source selection information. 603.104-4 Section 603.104-4 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF...

  6. 48 CFR 53.301-1405 - Preaward Survey of Prospective Contractor-Production.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Preaward Survey of Prospective Contractor-Production. 53.301-1405 Section 53.301-1405 Federal Acquisition Regulations System... Preaward Survey of Prospective Contractor—Production. EC01MY91.084 EC01MY91.085 EC01MY91.086 EC01MY91.087...

  7. 48 CFR 352.222-70 - Contractor cooperation in equal employment opportunity investigations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Opportunity (EEO) complaints processed pursuant to 29 CFR Part 1614. For purposes of this clause, the... equal employment opportunity investigations. 352.222-70 Section 352.222-70 Federal Acquisition... Texts of Provisions and Clauses 352.222-70 Contractor cooperation in equal employment...

  8. 78 FR 44158 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ...This final determination is the fourth revision of the list required by Executive Order 13126 (``Prohibition of Acquisition of Products Produced by Forced or Indentured Child Labor''), in accordance with the ``Procedural Guidelines for the Maintenance of the List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor Under 48 CFR Subpart 22.15 and E.O.......

  9. 48 CFR 252.225-7039 - Contractors performing private security functions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... private security functions. 252.225-7039 Section 252.225-7039 Federal Acquisition Regulations System... security functions. As prescribed in 225.370-6, insert the following clause: CONTRACTORS PERFORMING PRIVATE SECURITY FUNCTIONS (AUG 2011) (a) Definition. Private security functions means activities engaged in by...

  10. 48 CFR 1845.7101-5 - Contractor's privileged financial and business information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... financial and business information. 1845.7101-5 Section 1845.7101-5 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Forms Preparation 1845.7101-5 Contractor's privileged financial and business information. If a transfer of...

  11. 48 CFR 27.404-4 - Contractor's release, publication, and use of data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., publication, and use of data. 27.404-4 Section 27.404-4 Federal Acquisition Regulations System FEDERAL... Copyrights 27.404-4 Contractor's release, publication, and use of data. (a) In contracts for basic or applied research with universities or colleges, agencies shall not place any restrictions on the conduct of...

  12. 48 CFR 27.404-4 - Contractor's release, publication, and use of data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., publication, and use of data. 27.404-4 Section 27.404-4 Federal Acquisition Regulations System FEDERAL... Copyrights 27.404-4 Contractor's release, publication, and use of data. (a) In contracts for basic or applied research with universities or colleges, agencies shall not place any restrictions on the conduct of...

  13. Adaptable contractors thrive in changing domestic market

    SciTech Connect

    Watts, J.

    1984-01-01

    This paper describes how contractors will cope with the number of smaller lines and projects as opposed to long-line, big-inch pipeline projects. The paper also examines maintenance of the system and upgrading as opposed to new construction. The contractors also comment on how they are keeping down personnel and equipment, the major items in a contractor's budget. Innovations in construction methods and equipment are examined.

  14. Environmental Program Description for the Tank Farm Contractor

    SciTech Connect

    POWELL, P.A.

    2000-04-20

    This Environmental Program Description has been developed in support of the Integrated Environmental, Safety, and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan. This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Description for the Tank Farm Contractor (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of five core functions. Each section of this plan describes the activities (formerly known as the Tank Waste Remediation System) of the Tank Farm Contractor (TFC) environmental organization according to the following core functions: Establish Environmental Policy and Define Work Scope; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Provide Feedback and Continuous Improvement; and Perform Work within Controls.

  15. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel records to accomplish a function of GAO, GAO shall, consistent with its authority, cause the requirements..., for the purposes of this part, to be an employee of GAO. Contractor employees will be required...

  16. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating...

  17. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and...

  18. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and...

  19. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and...

  20. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and...

  1. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and...

  2. 7 CFR 1726.27 - Contractor's bonds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Contractor's bonds. 1726.27 Section 1726.27 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a)...

  3. 39 CFR 230.6 - Contractor requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Contractor requirements. 230.6 Section 230.6 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION OFFICE OF INSPECTOR GENERAL General Policy and Authority § 230.6 Contractor requirements. (a) The Office of Inspector General shall be the exclusive judge of its...

  4. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Contractor employees. 199.115 Section 199.115 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.115 Contractor...

  5. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 4 Accounts 1 2013-01-01 2013-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of...

  6. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 4 Accounts 1 2014-01-01 2013-01-01 true Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of...

  7. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 4 Accounts 1 2012-01-01 2012-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of...

  8. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a...

  9. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a...

  10. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a...

  11. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a...

  12. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a...

  13. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 4 Accounts 1 2011-01-01 2011-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of...

  14. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a...

  15. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a...

  16. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a...

  17. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a...

  18. General practitioners and the independent contractor status

    PubMed Central

    Gray, D. J. Pereira

    1977-01-01

    Primary medical care can be provided either by a bureaucratic hierarchical organization or alternatively by independent contractors. Most members of the caring professions in medicine, nursing, and social work are employed in bureaucracies, whereas general medical practitioners, general dental practitioners, opticians, and pharmacists are independent contractors. The independent contractor status has recently been heavily attacked from within the medical and nursing professions, and also from outside. It has been suggested that contracting for services is an inappropriate and anomalous way of arranging medical care, which should now be stopped. However, this process of contracting for services can be analysed, using perspectives from some of the behavioural sciences, to reveal hidden depths in the independent contractor status which suggest that the provision of primary medical care is best carried out by independent contractors. PMID:616865

  19. 48 CFR 908.7101-3 - Direct acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Direct acquisition. 908.7101-3 Section 908.7101-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7101-3 Direct acquisition. Vehicles may be acquired by...

  20. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time...

  1. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time...

  2. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time...

  3. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time...

  4. 76 FR 12795 - Department of Education Acquisition Regulation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... Register (75 FR 51884) to reissue the Department of Education Acquisition Regulation (EDAR). In the... contractor further agrees to insert provisions that substantially conform to the language of this section... commercial items SUBCHAPTER C--CONTRACTING METHODS AND CONTRACT TYPES 3413 Simplified acquisition...

  5. Environmental Program Description for the Tank Farm Contractor

    SciTech Connect

    POWELL, P.A.

    2002-07-18

    The Environmental Services organization's mission is to achieve effective environmental compliance and stewardship in managing and closing the tank farms. This Environmental Program Plan was developed in support of that mission and the Integrated Environment, Safety, and Health Management System Description for the Tank Farm Contractor (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS consists of five core functions. Each section of this plan describes the activities of the Tank Farm Contractor (TFC) environmental and waste management organization according to the following core functions: (1) Perform Work within Controls; (2) Establish Environmental Policy and Define Work Scope; (3) Identify Hazards, Environmental Impacts, and Requirements; (4) Analyze Hazards and Environmental Impacts and Implement Controls; and (5) Provide Feedback and Continuous Improvement.

  6. Acquisition and Analysis of Megavoltage Linac Beam Transmission Data for Direct Verification of Photon Spectra Models in a Treatment Planning System

    NASA Astrophysics Data System (ADS)

    Leheta, Dimitra S.

    . While in most cases switching the model spectrum with the measured one did not result in drastic differences in the calculated dose, plans with deviations of 4 to 8% in the maximum dose values for critical structures were discovered. Since spectrum information is used by TPS in evaluation of the scatter dose, the anatomical sites with large scatter contributions are the most vulnerable to inaccuracies in the modeled spectrum. The developed approach of using readily available attenuators and build-up caps in combination with streamlined data processing confirmed feasibility of acquisition of megavoltage linac beam spectra in a typical radiation oncology clinic, offering an independent check of the TPS model.

  7. Cost and schedule control systems criteria for contract performance measurement: contractor reporting/data analysis guide

    SciTech Connect

    Not Available

    1980-11-01

    The DOE Cost and Schedule Control Systems Criteria (CSCSC) require that a contractor's management control systems include methods and procedures designed to ensure that they will accomplish, in addition to other requirements, a summarization of data elements to the level of reporting to DOE specified in the contract under separate clause. Reports provided to DOE must relate contract cost, schedule, and technical accomplishment to a baseline plan, within the framework of both the contract Work Breakdown Structure (WBS) and the contractor's organizational structure. This Guide describes the reports available from contractors, with emphasis on the Cost Performance Report (CPR), and provides a framework for using the reported data as a basis for decision making. This Guide was developed to assist DOE Project Managers in assessing contractor performance through proper use of the CPR and supporting reports.

  8. 32 CFR 644.7 - Acquisition lines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... HANDBOOK Project Planning Civil Works § 644.7 Acquisition lines. (a) Tentative acquisition lines. As... submission may be for an entire project or by segments or units. However, if the final map is submitted on...

  9. List of Contractors to Support Anthrax Remediation

    SciTech Connect

    Judd, Kathleen S.; Lesperance, Ann M.

    2010-05-14

    This document responds to a need identified by private sector businesses for information on contractors that may be qualified to support building remediation efforts following a wide-area anthrax release.

  10. Extended abstracts: Ninth battery and electrochemical contractors' conference

    SciTech Connect

    Not Available

    1989-11-01

    This document contains the extended abstracts for presentations scheduled for the Ninth Battery and Electrochemical Contractors' Conference, highlighting research supporting by the US Department of Energy and the Electric Power Research Institute. It is intended to be a technical overview for engineers and scientists in government, industry, and academia who are interested in learning more about electrochemical energy storage. The abstracts are grouped according to the following technical sessions: Introductory Session; Sodium/Sulfur Battery Development; Planning, Analysis, and Technology Transfer; Fuel Cells; Zinc/Bromine Battery Development; Aqueous Battery Development; Non-Aqueous Batteries; Battery Testing and Evaluation; and Metal/Air Batteries.

  11. Emergency preparedness and planning

    NASA Technical Reports Server (NTRS)

    Bouvier, Kenneth

    1993-01-01

    Monsanto's emergency response plan in dealing with hazardous materials at their facilities is presented. Topics discussed include the following: CPR training; emergency medial training; incident reports; contractor injuries; hazardous materials transport; evacuation; and other industrial safety concerns.

  12. 48 CFR 970.5227-11 - Patent rights-management and operating contracts, for-profit contractor, non-technology transfer.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent rights-management and operating contracts, for-profit contractor, non-technology transfer. 970.5227-11 Section 970.5227-11 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS...

  13. 48 CFR 970.5227-11 - Patent rights-management and operating contracts, for-profit contractor, non-technology transfer.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Patent rights-management and operating contracts, for-profit contractor, non-technology transfer. 970.5227-11 Section 970.5227-11 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS...

  14. 75 FR 77745 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-47; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... and a contract clause requiring offerors and contractors to identify the percentage of work that will... collective bargaining, and protects the exercise by employees of their freedom to associate, to self organize... simplified acquisition threshold; (2) For work performed exclusively outside the United States; or...

  15. 76 FR 11985 - Acquisition Regulation: Department of Energy Acquisition Regulation, Government Property

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Property. On May 15, 2007 (72 FR 27364), in the Federal Acquisition Circular (FAC) 2005-17, FAR Part 45 was... definition of sensitive property. For clarity, since the FAR definition of sensitive property was changed... section ``945.102-72 Reporting of contractor sensitive property inventory'' to reflect the...

  16. 48 CFR 12.504 - Applicability of certain laws to subcontracts for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., Cost Accounting Standards (48 CFR chapter 99) (see 12.214). ... laws to subcontracts for the acquisition of commercial items. 12.504 Section 12.504 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION OF COMMERCIAL...

  17. Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-12-01

    In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

  18. An examination of electronic file transfer between host and microcomputers for the AMPMODNET/AIMNET (Army Material Plan Modernization Network/Acquisition Information Management Network) classified network environment

    SciTech Connect

    Hake, K.A.

    1990-11-01

    This report presents the results of investigation and testing conducted by Oak Ridge National Laboratory (ORNL) for the Project Manager -- Acquisition Information Management (PM-AIM), and the United States Army Materiel Command Headquarters (HQ-AMC). It concerns the establishment of file transfer capabilities on the Army Materiel Plan Modernization (AMPMOD) classified computer system. The discussion provides a general context for micro-to-mainframe connectivity and focuses specifically upon two possible solutions for file transfer capabilities. The second section of this report contains a statement of the problem to be examined, a brief description of the institutional setting of the investigation, and a concise declaration of purpose. The third section lays a conceptual foundation for micro-to-mainframe connectivity and provides a more detailed description of the AMPMOD computing environment. It gives emphasis to the generalized International Business Machines, Inc. (IBM) standard of connectivity because of the predominance of this vendor in the AMPMOD computing environment. The fourth section discusses two test cases as possible solutions for file transfer. The first solution used is the IBM 3270 Control Program telecommunications and terminal emulation software. A version of this software was available on all the IBM Tempest Personal Computer 3s. The second solution used is Distributed Office Support System host electronic mail software with Personal Services/Personal Computer microcomputer e-mail software running with IBM 3270 Workstation Program for terminal emulation. Test conditions and results are presented for both test cases. The fifth section provides a summary of findings for the two possible solutions tested for AMPMOD file transfer. The report concludes with observations on current AMPMOD understanding of file transfer and includes recommendations for future consideration by the sponsor.

  19. 78 FR 60173 - Federal Acquisition Regulation; Allowability of Legal Costs for Whistleblower Proceedings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... Federal Acquisition Regulation; Allowability of Legal Costs for Whistleblower Proceedings AGENCY... (NDAA) for Fiscal Year (FY) 2013 that addresses the allowability of legal costs incurred by a contractor..., Proceeding costs not allowable, to address the allowability of legal costs incurred by a contractor...

  20. 48 CFR 52.247-23 - Contractor Liability for Loss of and/or Damage to Household Goods.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Loss of and/or Damage to Household Goods. 52.247-23 Section 52.247-23 Federal Acquisition Regulations... Household Goods. As prescribed in 47.207-7(e), insert the following clause: Contractor Liability for Loss of and/or Damage to Household Goods (JAN 1991) (a) Except when loss and/or damage arise out of...

  1. 48 CFR 52.247-23 - Contractor Liability for Loss of and/or Damage to Household Goods.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Loss of and/or Damage to Household Goods. 52.247-23 Section 52.247-23 Federal Acquisition Regulations... Household Goods. As prescribed in 47.207-7(e), insert the following clause: Contractor Liability for Loss of and/or Damage to Household Goods (JAN 1991) (a) Except when loss and/or damage arise out of...

  2. 48 CFR 52.247-23 - Contractor Liability for Loss of and/or Damage to Household Goods.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Loss of and/or Damage to Household Goods. 52.247-23 Section 52.247-23 Federal Acquisition Regulations... Household Goods. As prescribed in 47.207-7(e), insert the following clause: Contractor Liability for Loss of and/or Damage to Household Goods (JAN 1991) (a) Except when loss and/or damage arise out of...

  3. 48 CFR 52.247-23 - Contractor Liability for Loss of and/or Damage to Household Goods.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Loss of and/or Damage to Household Goods. 52.247-23 Section 52.247-23 Federal Acquisition Regulations... Household Goods. As prescribed in 47.207-7(e), insert the following clause: Contractor Liability for Loss of and/or Damage to Household Goods (JAN 1991) (a) Except when loss and/or damage arise out of...

  4. 48 CFR 52.247-23 - Contractor Liability for Loss of and/or Damage to Household Goods.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Loss of and/or Damage to Household Goods. 52.247-23 Section 52.247-23 Federal Acquisition Regulations... Household Goods. As prescribed in 47.207-7(e), insert the following clause: Contractor Liability for Loss of and/or Damage to Household Goods (JAN 1991) (a) Except when loss and/or damage arise out of...

  5. 48 CFR 3.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 3.104-4 Disclosure, protection, and... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Disclosure, protection, and marking of contractor bid or proposal information and source selection information....

  6. 48 CFR 5.405 - Exchange of acquisition information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Exchange of acquisition information. 5.405 Section 5.405 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Release of Information 5.405 Exchange of...

  7. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 3 2014-07-01 2014-07-01 false Farm labor contractor is responsible for actions of his farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in...

  8. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 3 2012-07-01 2012-07-01 false Farm labor contractor is responsible for actions of his farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in...

  9. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 3 2013-07-01 2013-07-01 false Farm labor contractor is responsible for actions of his farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in...

  10. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 3 2011-07-01 2011-07-01 false Farm labor contractor is responsible for actions of his farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in...

  11. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Farm labor contractor is responsible for actions of his farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in...

  12. Report on audit of management and operating contractor overtime costs

    SciTech Connect

    1995-10-01

    The Department of Energy (Department) uses contractors to operate its facilities. During Fiscal Year 1994, the Department`s management and operating contractors (contractors) had a total payroll of about $6.6 billion. Of this amount, about $251 million was compensation for overtime pay. The purpose of our audit was to evaluate contractor overtime payments for compliance with applicable regulations and contract provisions. Our objective was to determine whether the Department had controls in place to monitor and manage contractor overtime use.

  13. 77 FR 5020 - General Services Administration Acquisition Regulation; Information Collection; GSA Form 527...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... ADMINISTRATION General Services Administration Acquisition Regulation; Information Collection; GSA Form 527, Contractor's Qualifications and Financial Information AGENCY: Office of the Chief Finance Officer, GSA... Financial Information. Public comments are particularly invited on: Whether this collection of...

  14. 76 FR 24443 - Federal Acquisition Regulation; Service Contracts Reporting Requirements; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ... (202) 501-0044. Please cite FAR Case 2010-010. Correction In the proposed rule FR Doc. 2011-9515... simplified acquisition threshold (SAT). Contractors will be required to report on new fixed-price...

  15. SNAP: Simulating New Acquisition Processes

    NASA Technical Reports Server (NTRS)

    Alfeld, Louis E.

    1997-01-01

    Simulation models of acquisition processes range in scope from isolated applications to the 'Big Picture' captured by SNAP technology. SNAP integrates a family of models to portray the full scope of acquisition planning and management activities, including budgeting, scheduling, testing and risk analysis. SNAP replicates the dynamic management processes that underlie design, production and life-cycle support. SNAP provides the unique 'Big Picture' capability needed to simulate the entire acquisition process and explore the 'what-if' tradeoffs and consequences of alternative policies and decisions. Comparison of cost, schedule and performance tradeoffs help managers choose the lowest-risk, highest payoff at each step in the acquisition process.

  16. Ground-based plasma contractor characterization

    NASA Technical Reports Server (NTRS)

    Patterson, Michael J.; Aadland, Randall S.

    1987-01-01

    Presented are recent NASA Lewis Research Center (LeRC) plasma contractor experimental results, as well as a description of the plasma contractor test facility. The operation of a 24 cm diameter plasma source with hollow cathode was investigated in the lighted-mode regime of electron current collection from 0.1 to 7.0 A. These results are compared to those obtained with a 12 cm plasma source. Full two-dimensional plasma potential profiles were constructed from emissive probe traces of the contractor plume. The experimentally measured dimensions of the plume sheaths were then compared to those theoretically predicted using a model of a spherical double sheath. Results are consistent for currents up to approximately 1.0 A. For currents above 1.0 A, substantial deviations from theory occur. These deviations are due to sheath asphericity, and possibly volume ionization in the double-sheath region.

  17. 78 FR 12051 - Access by EPA Contractors to Information Claimed as Confidential Business Information (CBI...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ...EPA's Office of Transportation and Air Quality (OTAQ) plans to authorize various contractors to access information which was submitted to EPA under Title II of the Clean Air Act that may be claimed as, or may be determined to be, confidential business information (CBI). Access to this information, which is related to the Nonroad Diesel Engine Program will begin on February 22,...

  18. Proposed Department of Defense software metrics implementation plan

    NASA Astrophysics Data System (ADS)

    Fife, Dennis W.; Popelas, Judy M.; Springsteen, Beth

    1994-09-01

    This report presents a proposed plan for DOD implementation of software metrics in support of acquisition reform and improved software risk management. The report documents the concluding phase of a one-year task to assess software metrics and to determine how to improve their use in software acquisition, particularly of weapon system software. An earlier effort surveyed the state of development and use of software metrics in industry and defense organizations. This survey found (1) that industry is strongly committed to using software metrics in a corporate-wide approach to gain marketplace advantages, and (2) that defense contractors exhibit a state of evolution in metrics use that is comparable to that of strictly commercial companies, if not more mature. The overall vision of the proposed plan is to establish a department-wide, bottom-to-top corporate approach for collecting and using software metrics to improve analysis and decision-making in software acquisition and risk management. Acquisition reform and the need for improved risk management should provide more specific goals to address under this vision, comparable to industry's goals of marketplace benefits from using software metrics. The plan is framed as eight specific recommendations, including a list of future research and development work that would support their implementation.

  19. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES COLLECTION, MAINTENANCE, USE, AND DISSEMINATION OF RECORDS OF...

  20. ROTATING BIOLOGICAL CONTRACTORS - HYDRAULIC VERSUS ORGANIC LOADING

    EPA Science Inventory

    Conventional and alternative flow configurations of rotating biological contractors were compared for soluble organic carbon and ammonia-nitrogen removal. Each treatment train contained eight shafts with a cumulative surface area of 800,000 ft sq. The hydraulic bay used the conve...