Science.gov

Sample records for acquisition planning publicizing

  1. 48 CFR 873.105 - Acquisition planning.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Acquisition planning. 873.105 Section 873.105 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS DEPARTMENT SUPPLEMENTARY REGULATIONS SIMPLIFIED ACQUISITION PROCEDURES FOR HEALTH-CARE RESOURCES 873.105 Acquisition planning. (a) Acquisition planning is...

  2. Publication planning 101.

    PubMed

    Sismondo, Sergio; Nicholson, Scott Howard

    2009-01-01

    Publication planning is the sub-industry to the pharmaceutical industry that does the organizational and practical work of shaping pharmaceutical companies' data and turning it into medical journal articles. Its main purpose is to create and communicate scientific information to support the marketing of products. This report is based mostly on information presented at the 2007 annual meeting of the International Society of Medical Planning Professionals, including a workshop entitled "Publication Planning 101/201", attended by one of us. We provide some analysis of the role of publication planning in medical publishing, and its implications for the structuring of medical knowledge. PMID:20067704

  3. Public affairs plan

    SciTech Connect

    Not Available

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

  4. Public Participation Plan

    SciTech Connect

    Not Available

    1993-07-01

    The purpose of this Public Participation Plan is to describe the US Department of Energy`s (DOE) plan for involving the public in the decision-making process for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The plan describes how the DOE will meet the public participation requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, as amended, and of the National Environmental Policy Act (NEPA) of 1969. It includes the UMTRA Project Office plans for complying with DOE Order 5440.1D and for implementing the DOE`s Public Participation Policy for Environmental Restoration and Waste Management (1992) and Public Participation Guidance for Environmental Restoration and Waste Management (1993).

  5. Public affairs plan

    SciTech Connect

    1995-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies.

  6. Planning a Public Presentation.

    ERIC Educational Resources Information Center

    Kaufmann, Karl F.

    1987-01-01

    This discussion of factors to consider in planning a successful public presentation highlights multimedia presentations; verbal skills; proper use of visual materials; an explanation of vision measurements; lettering size and style; screen size; level of illumination; and machine handling. (LRW)

  7. Teacher Trainees' Information Acquisition in Lesson Planning

    ERIC Educational Resources Information Center

    Tanni, Mikko

    2012-01-01

    Introduction: Few studies have addressed teacher trainees' information acquisition in the context of a task. The paper reports findings from an empirical study on teacher trainees' use of information (seeking) channels and sources, and their modes of information acquisition in lesson planning. Method: Semi-structured (retrospectively held)…

  8. National Ignition Facility project acquisition plan

    SciTech Connect

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

  9. 48 CFR 907.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contents of written acquisition plans. 907.105 Section 907.105 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... acquisition plans. (b)(16) Environmental and energy conservation objectives. Incorporate sustainable...

  10. 48 CFR 873.105 - Acquisition planning.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... equipment or space, where the acquisition is expected to exceed the simplified acquisition threshold (SAT... particular acquisition expected to exceed the SAT. The team should consist of a mix of staff, appropriate...

  11. Public Information Plan. [UMTRA Project

    SciTech Connect

    Not Available

    1984-06-01

    The Public Information Plan is intended to be used in conjunction with the DOE-UMTRA Project Public Participation Plan'' to describe the Department of Energy's plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control of Act of 1978, PL95-604. The Act provides for a cooperative effort with affected states and Indian tribes for the cleanup of designated abandoned or inactive uranium mill tailings sites. The objective of the Public Information Plan of the UMTRA Project is timely and sufficient dissemination of factual information to promote understanding of the project by federal, state, and local officials, the media, special interest groups, and the general public; and thereby to encourage informed participation in the project by the public and government officials. The Uranium Mill Tailings Radiation Control Act provides for public involvement in remedial action planning, with special consideration given to landowners, Indian tribes, and the states. According to the Act, the Secretary of Energy shall hold public hearings in the states where processing sites, vicinity properties, and disposal sites are located. Public participation in the UMTRA Project will not, however, be limited to those mechanisms formally required by law. The public may also be involved informally through informational meetings, workshops, and local citizens' task forces. 12 refs., 2 figs., 1 tab.

  12. Image acquisition planning for the CHRIS sensor onboard PROBA

    NASA Astrophysics Data System (ADS)

    Fletcher, Peter A.

    2004-10-01

    The CHRIS (Compact High Resolution Imaging Spectrometer) instrument was launched onboard the European Space Agency (ESA) PROBA satellite on 22 October 2001. CHRIS can acquire up to 63 bands of hyperspectral data at a ground spatial resolution of 36m. Alternatively, the instrument can be configured to acquire 18 bands of data with a spatial resolution of 17m. PROBA, by virtue of its agile pointing capability, enables CHRIS to acquire five different angle images of the selected site. Two sites can be acquired every 24 hours. The hyperspectral and multi-angle capability of CHRIS makes it an important resource for stydying BRDF phenomena of vegetation. Other applications include coastal and inland waters, wild fires, education and public relations. An effective data acquisition planning procedure has been implemented and since mid-2002 users have been receiving data for analysis. A cloud prediction routine has been adopted that maximises the image acquisition capacity of CHRIS-PROBA. Image acquisition planning is carried out by RSAC Ltd on behalf of ESA and in co-operation with Sira Technology Ltd and Redu, the ESA ground station in Belgium, responsible for CHRIS-PROBA.

  13. National Ignition Facility project acquisition plan revision 1

    SciTech Connect

    Clobes, A.R.

    1996-10-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  14. Planning Istanbul's Public Library System.

    ERIC Educational Resources Information Center

    Dokmeci, Vedia; Korca, Perver

    1992-01-01

    Discussion of the role of public libraries in socioeconomic development focuses on an evaluation of the existing library system in Istanbul (Turkey) and proposes a plan for its balanced development with respect to population distribution and technological advances. Highlights include building design, library automation, and financial…

  15. Public Participation Plan. [Contains glossary

    SciTech Connect

    Not Available

    1984-06-01

    The purpose of this Public Participation Plan is to describe the Department of Energy's plan for involving the public in the decision-making process required by the National Environmental Policy Act (NEPA) of 1969 as related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by congress in the Uranium Mill Tailings Radiation Control Act of 1978, PL95-604. The Act provides for a cooperative effort with affected states and Indian tribes for the cleanup of designated inactive uranium mill tailings sites and associated vicinity properties, which are located in ten western states and in Pennsylvania. The Act was amended in 1982 to also include vicinity properties contaminated with residual radioactive material in Edgemont, South Dakota.

  16. Planning and Acquisition Problems for a Growing University.

    ERIC Educational Resources Information Center

    Learn, Elmer W.

    Some tentative conclusions based on an urban university community planning program deal with the characteristics of university communities, special problems engendered by these characteristics, and methods to combat them. The problems discussed center around planning, land acquisition, zoning and community relations. (HH)

  17. Acquisition of Publications from Asiatic Countries: Dutch Problems.

    ERIC Educational Resources Information Center

    Schiltman, Maria J.

    This presentation of the Dutch experience with the international exchange of publications focuses on the acquisition of publications from China and Indonesia to illustrate problems of availability. Lack of depository systems, restrictive export policies, inadequate national bibliographies, exorbitant commercial prices, and time consuming delivery…

  18. Public Pension Plan Reform: The Legal Framework

    ERIC Educational Resources Information Center

    Monahan, Amy B.

    2010-01-01

    There is significant interest in reforming retirement plans for public school employees, particularly in light of current market conditions. This article presents an overview of the various types of state regulation of public pension plans that affect possibilities for reform. Nearly all of the various approaches to public pension plan protection…

  19. AZ-101 Mixer Pump Demonstration Data Acquisition System and Gamma Cart Data Acquisition Control System Software Configuration Management Plan

    SciTech Connect

    WHITE, D.A.

    1999-12-29

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the AZ1101 Mixer Pump Demonstration Data Acquisition System (DAS) and the Sludge Mobilization Cart (Gamma Cart) Data Acquisition and Control System (DACS).

  20. Tank farm instrumentation and data acquisition/management upgrade plan

    SciTech Connect

    Scaief, C.C. III

    1994-09-13

    This plan provides the strategy, implementation, and schedule for upgrading tank farm instrumentation, data acquisition and data management. The focus is on surveillance parameters to verify and maintain tank safety. The criteria do not necessarily constitute mandatory requirements but are based upon engineering judgement and best available information. Schedules reflect preliminary funding for FY95. For out years they are best engineering judgment.

  1. Citizen Involvement in Public Library Planning.

    ERIC Educational Resources Information Center

    Stephens, Annabel K.

    1991-01-01

    Discusses the planning process for public libraries developed by the Public Library Association (PLA) and describes two libraries' use of the planning process and the resulting benefits. Topics discussed include lay citizens as planning committee members; Friends of the Library; involvement of local government officials; and resultant increases in…

  2. 41 CFR 102-34.80 - Where may we obtain help with our motor vehicle acquisition plans?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Where may we obtain help with our motor vehicle acquisition plans? 102-34.80 Section 102-34.80 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 34-MOTOR VEHICLE...

  3. 41 CFR 102-34.80 - Where may we obtain help with our motor vehicle acquisition plans?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... PROPERTY 34-MOTOR VEHICLE MANAGEMENT Obtaining Fuel Efficient Motor Vehicles § 102-34.80 Where may we... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Where may we obtain help with our motor vehicle acquisition plans? 102-34.80 Section 102-34.80 Public Contracts and...

  4. Satellite land use acquisition and applications to hydrologic planning models

    NASA Technical Reports Server (NTRS)

    Algazi, V. R.; Suk, M.

    1977-01-01

    A developing operational procedure for use by the Corps of Engineers in the acquisition of land use information for hydrologic planning purposes was described. The operational conditions preclude the use of dedicated, interactive image processing facilities. Given the constraints, an approach to land use classification based on clustering seems promising and was explored in detail. The procedure is outlined and examples of application to two watersheds given.

  5. A Public Opinion Survey on Educational Planning.

    ERIC Educational Resources Information Center

    Puzzuoli, David A.; Gillespie, John O.

    Major objectives of this planning study were (1) to determine public opinion as related to the need for a "multi-county" educational service unit and (2) to determine public opinion on selected school functions as they are presently organized in Region II, West Virginia. The 3 phases of the study consisted of development of the questionnaire by…

  6. Public Voucher Plans. Trends and Issues.

    ERIC Educational Resources Information Center

    Hadderman, Margaret

    This document provides an overview of public-school voucher plans. Educational vouchers originated in the 1960s when Milton Friedman argued that vouchers would improve educational efficiency. Parents would receive the equivalent of per-pupil expenditures in the form of vouchers that could then be used at any school, either public and private. But…

  7. Acquisition of background and technical information and class trip planning

    NASA Technical Reports Server (NTRS)

    Mackinnon, R. M.; Wake, W. H.

    1981-01-01

    Instructors who are very familiar with a study area, as well as those who are not, find the field trip information acquisition and planning process speeded and made more effective by organizing it in stages. The stage follow a deductive progression: from the associated context region, to the study area, to the specific sample window sites, and from generalized background information on the study region to specific technical data on the environmental and human use systems to be interpreted at each site. On the class trip and in the follow up laboratory, the learning/interpretive process are at first deductive in applying previously learned information and skills to analysis of the study site, then inductive in reading and interpreting the landscape, imagery, and maps of the site, correlating them with information of other samples sites and building valid generalizations about the larger study area, its context region, and other (similar and/or contrasting) regions.

  8. Urban planning and public health at CDC.

    PubMed

    Kochtitzky, Chris S; Frumkin, H; Rodriguez, R; Dannenberg, A L; Rayman, J; Rose, K; Gillig, R; Kanter, T

    2006-12-22

    Urban planning, also called city and regional planning, is a multidisciplinary field in which professionals work to improve the welfare of persons and communities by creating more convenient, equitable, healthful, efficient, and attractive places now and for the future. The centerpiece of urban planning activities is a "master plan," which can take many forms, including comprehensive plans, neighborhood plans, community action plans, regulatory and incentive strategies, economic development plans, and disaster preparedness plans. Traditionally, these plans include assessing and planning for community needs in some or all of the following areas: transportation, housing, commercial/office buildings, natural resource utilization, environmental protection, and health-care infrastructure. Urban planning and public health share common missions and perspectives. Both aim to improve human well-being, emphasize needs assessment and service delivery, manage complex social systems, focus at the population level, and rely on community-based participatory methods. Both fields focus on the needs of vulnerable populations. Throughout their development, both fields have broadened their perspectives. Initially, public health most often used a biomedical model (examining normal/abnormal functioning of the human organism), and urban planning often relied on a geographic model (analysis of human needs or interactions in a spatial context). However, both fields have expanded their tools and perspectives, in part because of the influence of the other. Urban planning and public health have been intertwined for most of their histories. In 1854, British physician John Snow used geographic mapping of an outbreak of cholera in London to identify a public water pump as the outbreak's source. Geographic analysis is a key planning tool shared by urban planning and public health. In the mid-1800s, planners such as Frederick Law Olmsted bridged the gap between the fields by advancing the concept

  9. Action Plan for Florida's Public Libraries. Addendum.

    ERIC Educational Resources Information Center

    Florida Library Study Commission, Tallahassee.

    The introduction to this addendum (the Action Plan is LI 004 521) discusses the present use by libraries of information-handling technology and identifies some of the trends taking place in performing essential library services. While some limited inroads have been made in automating certain public library functions, the bulk of services is still…

  10. Role-Playing Planning Public Inquiries.

    ERIC Educational Resources Information Center

    Livingstone, Ian

    1999-01-01

    Suggests that using the format of the planning public inquiry as a model for a learning activity provides geography students, usually working in teams, with the opportunity to investigate environmental issues from a particular point of view and to present their case as an oral presentation and written report. (DSK)

  11. AdaNET Dynamic Software Inventory (DSI) prototype component acquisition plan

    NASA Technical Reports Server (NTRS)

    Hanley, Lionel

    1989-01-01

    A component acquisition plan contains the information needed to evaluate, select, and acquire software and hardware components necessary for successful completion of the AdaNET Dynamic Software Inventory (DSI) Management System Prototype. This plan will evolve and be applicable to all phases of the DSI prototype development. Resources, budgets, schedules, and organizations related to component acquisition activities are provided. A purpose and description of a software or hardware component which is to be acquired are presented. Since this is a plan for acquisition of all components, this section is not applicable. The procurement activities and events conducted by the acquirer are described and who is responsible is identified, where the activity will be performed, and when the activities will occur for each planned procurement. Acquisition requirements describe the specific requirements and standards to be followed during component acquisition. The activities which will take place during component acquisition are described. A list of abbreviations and acronyms, and a glossary are contained.

  12. Public space launch acquisition: A comparative case study

    NASA Astrophysics Data System (ADS)

    Leeson, Kenneth R.; Rosen, Lee W.

    1992-09-01

    Three commonly practiced approaches to government acquisition of space launch services are analyzed. These approaches are employed by the U.S. Air Force, the National Aeronautics and Space Administration, and the Strategic Defense Initiative Organization. The literature review provides a comprehensive overview of the commercial space launch industry and details critical perspectives on commercial launch. Launch contracts which were representative of each organization's acquisition procedures were investigated and evaluated along several critical issues and elements of the space launch acquisition process. These issues included payload characteristics, government oversight, contractor incentives, insurance, liability, and cost. The critical issues and elements were determined by using the Delphi method to survey 25 experts in the space launch field. Archival contractual data from the three government agencies were obtained and found many inconsistencies among the different agencies' acquisition procedures. The thesis ends with a recommendation for a hybrid acquisition approach encompassing the strengths of the three cases.

  13. A geostationary longitude acquisition planning algorithm. [for maneuver planning of geosynchronous satellites

    NASA Technical Reports Server (NTRS)

    Petruzzo, C. J.; Bryant, W. C., Jr.; Nickerson, K. G.

    1977-01-01

    The paper is concerned with the phase of the geosynchronous mission termed station acquisition, which involves the maneuvering of a spacecraft to its geostationary longitude by means of the spacecraft propulsion system. An algorithm which assists in maneuver planning is described, and examples of its use are presented. The algorithm can be applied when sequences of more than three maneuvers are to be expected. While, in general, three maneuvers are sufficient to achieve the desired end conditions when orbital mechanics are the only consideration, operational considerations may add constraints resulting in an increased number of maneuvers required.

  14. 48 CFR 7.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... small business concerns. (iii) For information technology acquisitions using Internet Protocol, discuss... 16.505(a)(3)). (ii) For each order contemplated, discuss— (A) For information technology acquisitions... will be established, maintained, and monitored (see Subpart 4.4). For information...

  15. 48 CFR 7.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... small business concerns. (iii) For information technology acquisitions using Internet Protocol, discuss... 16.505(a)(3)). (ii) For each order contemplated, discuss— (A) For information technology acquisitions... will be established, maintained, and monitored (see Subpart 4.4). For information...

  16. 77 FR 38296 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... HUMAN SERVICES Centers for Disease Control and Prevention Draft Public Health Action Plan--A National Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... Federal Register requesting public comment on the draft National Public Health Action Plan for...

  17. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... HUMAN SERVICES Centers for Disease Control and Prevention Draft Public Health Action Plan--A National Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... requesting public comment on the draft National Public Health Action Plan for the Detection, Prevention,...

  18. Integrating public perspectives in sample return planning.

    PubMed

    Race, M S; MacGregor, D G

    2000-01-01

    Planning for extraterrestrial sample returns--whether from Mars or other solar system bodies--must be done in a way that integrates planetary protection concerns with the usual mission technical and scientific considerations. Understanding and addressing legitimate societal concerns about the possible risks of sample return will be a critical part of the public decision making process ahead. This paper presents the results of two studies, one with lay audiences, the other with expert microbiologists designed to gather information on attitudes and concerns about sample return risks and planetary protection. Focus group interviews with lay subjects, using generic information about Mars sample return and a preliminary environmental impact assessment, were designed to obtain an indication of how the factual content is perceived and understood by the public. A research survey of microbiologists gathered information on experts' views and attitudes about sample return, risk management approaches and space exploration risks. These findings, combined with earlier research results on risk perception, will be useful in identifying levels of concern and potential conflicts in understanding between experts and the public about sample return risks. The information will be helpful in guiding development of the environmental impact statement and also has applicability to proposals for sample return from other solar system bodies where scientific uncertainty about extraterrestrial life may persist at the time of mission planning. PMID:12038482

  19. Integrating Public Perspectives in Sample Return Planning

    NASA Technical Reports Server (NTRS)

    Race, Margaret S.; MacGregor, G.

    2001-01-01

    Planning for extraterrestrial sample returns, whether from Mars or other solar system bodies, must be done in a way that integrates planetary protection concerns with the usual mission technical and scientific considerations. Understanding and addressing legitimate societal concerns about the possible risks of sample return will be a critical part of the public decision making process ahead. This paper presents the results of two studies, one with lay audiences, the other with expert microbiologists, designed to gather information, on attitudes and concerns about sample return risks and planetary protection. Focus group interviews with lay subjects, using generic information about Mars sample return and a preliminary environmental impact assessment, were designed to obtain an indication of how the factual content is perceived and understood by the public. A research survey of microbiologists gathered information on experts' views and attitudes about sample return, risk management approaches and space exploration risks. These findings, combined with earlier research results on risk perception, will be useful in identifying levels of concern and potential conflicts in understanding between experts and the public about sample return risks. The information will be helpful in guiding development of the environmental impact statement and also has applicability to proposals for sample return from other solar system bodies where scientific uncertainty about extraterrestrial life may persist at the time of mission planning.

  20. 47 CFR 90.16 - Public Safety National Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Public Safety National Plan. 90.16 Section 90... PRIVATE LAND MOBILE RADIO SERVICES Public Safety Radio Pool § 90.16 Public Safety National Plan. The Commission has established a National Plan which specifies special policies and procedures governing...

  1. A Conflict of Cultures: Planning vs. Tradition in Public Libraries.

    ERIC Educational Resources Information Center

    Raber, Douglas

    1995-01-01

    Strategic planning for public libraries as advocated by the PLA (Public Library Association) in the Public Library Development Program is likely to be met with resistance due to changes it requires in traditional public library planning and services. Conflicts that may arise are discussed, as well as methods for preventing, minimizing, and…

  2. 76 FR 75875 - Defense Federal Acquisition Regulation Supplement; Open Source Software Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... Software Public Meeting AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION... regarding the use of open source software in DoD contracts. DATES: Public Meeting: January 12, 2012, from 10... for the discussions in the meeting. Please cite ``Public Meeting, DFARS--Open Source Software'' in...

  3. 78 FR 41331 - Federal Acquisition Regulation; Publicizing Contract Actions; Contracting by Negotiation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 48 CFR Parts 5 and 15 Federal Acquisition Regulation; Publicizing Contract Actions; Contracting by Negotiation CFR Correction...

  4. Knowledge Acquisition, Validation, and Maintenance in a Planning System for Automated Image Processing

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.

    1996-01-01

    A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintainting the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems. This paper describes a planning application of automated imaging processing and our overall approach to knowledge acquisition for this application.

  5. Effectiveness of publications in family planning program.

    PubMed

    Noor Laily Abu Bakar; Tan, B A; Tey, N P; Yusuf, Y

    1983-12-01

    The aim of the present study is to evaluate the degree of exposure to to Information, Education, and Communication (I.E.C.) publications such as pamphlets and booklets on contraceptive methods among those who have attended the dialog sessions; and to investigate the effects of such exposure on contraceptive use as well as the ppropensity to talk about family planning. The survey, conducted by the National Family Planning Board and assisted by the Sciences University of Malaysia in 1978/79, covers 6 states. A total of 1190 respondents were selected from those who attended dialog sessions during that period. Of the total sample, 723 respondents (60.8%) were contacted and interviewed. The I.E.C. publications evaluated in this survey include booklets on methods of contraception; pamphlets on the pill, IUD, condom, rhythm method, tubal ligation, vasectomy; booklets on responsible parenthood, flip charts and posters. 61% of the respondents have been exposed to at least 1 form of the I.E.C. materials. About 17 to 18% of currently married respondents have been exposed to pamphlets on tubal ligation, rhythm methods, IUD and condom; 22% have been exposed to pamphlets on the pill and 43% to booklets on contraceptive methods. In gerneral, those who have been exposed to pamphlets on a particular method were more likely to use that method. Among those who have been exposed to pamphlets on the pill 26.4% were using the pill compared to 16.2% who have not been exposed. The proportion of condom users were 3 times more after exposure to pamphlets on the condom: 16% vs. 4.7%. About 50% of currently married respondents were using a contraceptive method at the time of the survey. Of those who have not been exposed to I.E.C. materials, only 34.4% were using a method, compared to 53-60% of those who had been exposed. Exposure to I.E.C. materials and its interaction with ethnicity act as the most important factor in accounting for the differntials in contraceptive use, both in the

  6. Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.

  7. 76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... the draft, A Public Health Action Plan to Combat Antimicrobial Resistance (76 FR 14402). Written and... HUMAN SERVICES Centers for Disease Control and Prevention Draft Action Plan--A Public Health Action Plan...), Department of Health and Human Services (DHHS). ACTION: Extension of public comment period. SUMMARY: On...

  8. 24 CFR 906.41 - Additional supporting documentation for acquisition of non-public housing for homeownership.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... for acquisition of non-public housing for homeownership. 906.41 Section 906.41 Housing and Urban... FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING... acquisition of non-public housing for homeownership. (a) Proposal contents. The PHA must submit an...

  9. 24 CFR 906.41 - Additional supporting documentation for acquisition of non-public housing for homeownership.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... for acquisition of non-public housing for homeownership. 906.41 Section 906.41 Housing and Urban... FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING... acquisition of non-public housing for homeownership. (a) Proposal contents. The PHA must submit an...

  10. 63. PLANS FOR PROPOSED HISTORICAL CANAL SECTION AND PUBLIC BOAT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. PLANS FOR PROPOSED HISTORICAL CANAL SECTION AND PUBLIC BOAT LAUNCH RAMP Plan Sheet D-29976, Venice Canals Rehabilitation, Sheet 25 of 26 (delineated by Manuel Bartolome, November 1991) - Venice Canals, Community of Venice, Los Angeles, Los Angeles County, CA

  11. 77 FR 45612 - Federal Acquisition Regulation; Information Collection; Professional Employee Compensation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... Regulation; Information Collection; Professional Employee Compensation Plan AGENCY: Department of Defense... previously approved information collection requirement concerning submission of a Professional Employee Compensation Plan. Public comments are particularly invited on: Whether this collection of information...

  12. Acquisition Planning, Ethnic Discourse, and the Ecuadorian Nation-State.

    ERIC Educational Resources Information Center

    King, Kendall

    1994-01-01

    This paper examines the language planning efforts of the government of Ecuador and groups representing the indigenous peoples of the country. Government sanctioned policy and practice, as well as the grassroots efforts of the Indian population, both aim to influence language behavior and both have ultimately been directed at social and political…

  13. Acquisition Policy Planning and Litigation: Language Planning in the Context of "Y.S. v. District of Philadelphia."

    ERIC Educational Resources Information Center

    Skilton, Ellen E.

    1992-01-01

    This paper discusses language policy and educational practice in the context of a class action law suit filed on behalf of Asian students in Philadelphia concerning their linguistic and academic needs. It addresses both macro and micro perspectives in its discussion of litigation policy, acquisition policy planning, and Asian Americans in the…

  14. Acquisition of business intelligence from human experience in route planning

    NASA Astrophysics Data System (ADS)

    Bello Orgaz, Gema; Barrero, David F.; R-Moreno, María D.; Camacho, David

    2015-04-01

    The logistic sector raises a number of highly challenging problems. Probably one of the most important ones is the shipping planning, i.e. plan the routes that the shippers have to follow to deliver the goods. In this article, we present an artificial intelligence-based solution that has been designed to help a logistic company to improve its routes planning process. In order to achieve this goal, the solution uses the knowledge acquired by the company drivers to propose optimised routes. Hence, the proposed solution gathers the experience of the drivers, processes it and optimises the delivery process. The solution uses data mining to extract knowledge from the company information systems and prepares it for analysis with a case-based reasoning (CBR) algorithm. The CBR obtains critical business intelligence knowledge from the drivers experience that is needed by the planner. The design of the routes is done by a genetic algorithm that, given the processed information, optimises the routes following several objectives, such as minimise the distance or time. Experimentation shows that the proposed approach is able to find routes that improve, on average, the routes made by the human experts.

  15. NNSA?s Computing Strategy, Acquisition Plan, and Basis for Computing Time Allocation

    SciTech Connect

    Nikkel, D J

    2009-07-21

    This report is in response to the Omnibus Appropriations Act, 2009 (H.R. 1105; Public Law 111-8) in its funding of the National Nuclear Security Administration's (NNSA) Advanced Simulation and Computing (ASC) Program. This bill called for a report on ASC's plans for computing and platform acquisition strategy in support of stockpile stewardship. Computer simulation is essential to the stewardship of the nation's nuclear stockpile. Annual certification of the country's stockpile systems, Significant Finding Investigations (SFIs), and execution of Life Extension Programs (LEPs) are dependent on simulations employing the advanced ASC tools developed over the past decade plus; indeed, without these tools, certification would not be possible without a return to nuclear testing. ASC is an integrated program involving investments in computer hardware (platforms and computing centers), software environments, integrated design codes and physical models for these codes, and validation methodologies. The significant progress ASC has made in the past derives from its focus on mission and from its strategy of balancing support across the key investment areas necessary for success. All these investment areas must be sustained for ASC to adequately support current stockpile stewardship mission needs and to meet ever more difficult challenges as the weapons continue to age or undergo refurbishment. The appropriations bill called for this report to address three specific issues, which are responded to briefly here but are expanded upon in the subsequent document: (1) Identify how computing capability at each of the labs will specifically contribute to stockpile stewardship goals, and on what basis computing time will be allocated to achieve the goal of a balanced program among the labs. (2) Explain the NNSA's acquisition strategy for capacity and capability of machines at each of the labs and how it will fit within the existing budget constraints. (3) Identify the technical

  16. PK-12 Public Educational Facilities Master Plan Evaluation Guide

    ERIC Educational Resources Information Center

    21st Century School Fund, 2011

    2011-01-01

    Proper planning of school facilities is critical for all school districts no matter how large or small, whether major construction is in the works or the district is managing enrollment declines. When school districts properly plan for their school facilities they have better schools, more public use and higher value for public spending. This…

  17. 32 CFR Appendix D to Part 651 - Public Participation Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Public Participation Plan D Appendix D to Part 651 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Pt. 651, App. D Appendix D to Part 651—Public Participation Plan The objective of...

  18. 12 CFR 25.45 - Publication of planned examination schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Publication of planned examination schedule. 25... REINVESTMENT ACT AND INTERSTATE DEPOSIT PRODUCTION REGULATIONS Regulations Records, Reporting, and Disclosure Requirements § 25.45 Publication of planned examination schedule. The OCC publishes at least 30 days in...

  19. Savoy/TMA Public Education Campus Plan

    ERIC Educational Resources Information Center

    21st Century School Fund, 2006

    2006-01-01

    The Savoy/TMA Public Education Campus encompasses the 3.5 acres that includes the Savoy Elementary School and the former Nichols Avenue School, now the fully modernized Thurgood Marshall Academy Public Charter High School (TMA) and a recreation center sponsored by the Department of Parks and Recreation. As a part of public initiatives to better…

  20. Are Corporate Strategic Planning Techniques Useful in Public Higher Education?

    ERIC Educational Resources Information Center

    Wood, Kenneth L.; Wood, Susan Hawthorne

    Long-range planning techniques used by U.S. business corporations and the potential adaptation of these processes by public colleges and universities are examined. The state-of-the-art is developed by reviewing corporate strategic planning methods from the 1950s through the 1970s. Strategic planning, as defined by Drucker, is a continuous process…

  1. Public involvement plan for the Oak Ridge Reservation

    SciTech Connect

    1996-06-01

    This Public Information Plan is a user`s guide for getting involved in US Department of Energy environmental decisions in Oak Ridge, Tennessee. It outlines the many ways the public can help DOE find solutions to its environmental challenges. The plan focuses on DOE`s Environmental Management public involvement activities. Environmental Management is composed of the following programs: environmental restoration, technology development and waste management.

  2. Planning Activities and Organization for Planning at Four-Year Public Institutions of Higher Education.

    ERIC Educational Resources Information Center

    Ward, Billy L.; Shrout, John R.

    A survey was conducted to determine: (1) what percentage of total planning time of the various personnel involved in institutional planning is allocated to the several planning functions; and (2) how planning functions are organized at small four-year public institutions. A questionnaire was mailed to the chief executive officers of 188…

  3. Cutting Edge Books: The Impact of Digital Books on Public Library Acquisitions

    ERIC Educational Resources Information Center

    Taylor, Lisa

    2008-01-01

    The book has made the transition to the digital age; that much is certain. However, the jury is still out on what form or forms the book of the future will take and how libraries will adapt. This article is a look at the impact of digital books on public library acquisitions, including available formats, purchasing considerations, functional…

  4. 75 FR 34273 - Federal Acquisition Regulation; FAR Case 2008-003, Public Disclosure of Justification and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... at 74 FR 2731 on January 15, 2009, with an effective date of February 17, 2009, and a request for... the Federal Register at 74 FR 2731 on January 15, 2009, is adopted as a final rule with the following... 24 RIN 9000-AL13 Federal Acquisition Regulation; FAR Case 2008-003, Public Disclosure...

  5. Unit Time/Cost Study of the Acquisitions Unit, Technical Services Division, Tucson Public Library.

    ERIC Educational Resources Information Center

    Bierman, Kenneth J.; And Others

    In the third and final report of a series designed to develop unit time and costs for the major operations of the Technical Services Division of the Tucson Public Library, the Acquisitions Unit's activities are analyzed by means of self-recorded daily logs. Ordering, accounting, and receiving are performed in this area, and those functions are…

  6. 75 FR 40714 - Defense Federal Acquisition Regulation Supplement; Publication of Notification of Bundling of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF DEFENSE... Supplement; Publication of Notification of Bundling of Contracts of the Department of Defense (DFARS Case 2009-D033) AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION:...

  7. Developing a publicity plan for library research: the Rochester Study.

    PubMed

    Smith, B T

    1992-01-01

    The hospital librarians in Rochester, New York and a research team developed and administered a questionnaire to measure the impact of information provided by the librarian on physicians' clinical decision making. While the research was underway, the librarians also developed a publicity plan. The goal of the plan was to create awareness of the study results in the local client population, as well as in the health care community at large. The plan served to describe and put in priority order the types of media that the librarians would use to publicize the study to target groups. This article includes examples of a nationwide and an institution-specific publicity plan. those developing publicity plans for future library research may want to allocate adequate funds to hire a media consultant to increase their prospects for national exposure. PMID:10124016

  8. Behavioral economics perspectives on public sector pension plans

    PubMed Central

    BESHEARS, JOHN; CHOI, JAMES J.; LAIBSON, DAVID; MADRIAN, BRIGITTE C.

    2011-01-01

    We describe the pension plan features of the states and the largest cities and counties in the U.S. Unlike in the private sector, defined benefit (DB) pensions are still the norm in the public sector. However, a few jurisdictions have shifted toward defined contribution (DC) plans as their primary savings plan, and fiscal pressures are likely to generate more movement in this direction. Holding fixed a public employee’s work and salary history, we show that DB retirement income replacement ratios vary greatly across jurisdictions. This creates large variation in workers’ need to save for retirement in other accounts. There is also substantial heterogeneity across jurisdictions in the savings generated in primary DC plans because of differences in the level of mandatory employer and employee contributions. One notable difference between public and private sector DC plans is that public sector primary DC plans are characterized by required employee or employer contributions (or both), whereas private sector plans largely feature voluntary employee contributions that are supplemented by an employer match. We conclude by applying lessons from savings behavior in private sector savings plans to the design of public sector plans. PMID:21789032

  9. Public Park Acquisition: The Saticoy Golf Course. Research Reports in Public Policy, Number 1.

    ERIC Educational Resources Information Center

    Lee, William

    Reported is a demonstration of the use of basic economic principles to aid local governments in decision making. The problem analyzed in this study is the possible acquisition and development of a golf course by the City of San Buenaventura, California. Three purchasing alternatives and several financing options are examined. Researchers conclude…

  10. 48 CFR 5.405 - Exchange of acquisition information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Exchange of acquisition information. 5.405 Section 5.405 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Release of Information 5.405 Exchange of...

  11. Bandwidth, Broadband, and Planning for Public Access

    ERIC Educational Resources Information Center

    Blowers, Helene

    2012-01-01

    Broadband and bandwidth allocation is an essential technology planning activity that libraries should address on a continual basis. There are five key factors that will impact your network's performance: 1. infrastructure, 2. network load, 3. workstation performance, 4. prioritization of services, and 5. network management. The author thinks it's…

  12. 78 FR 38782 - Public Review and Comment; Public Hearing-2013 Update of Comprehensive Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-27

    ... Commission released a proposed 2013 Update of the Comprehensive Plan for the Water Resources of the... Comprehensive Plan for the Water Resources of the Susquehanna River Basin and other related information are... resources. As part of the public comment process, the Commission will hold a public hearing to...

  13. 8. Photocopy of measured drawings (from Plans of Public Buildings ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photocopy of measured drawings (from Plans of Public Buildings . . . Custom House, Post Office and Court Room (Wheeling, VA), 1855.) A. B. Young, Architect 1855 PLANS OF SECOND AND THIRD STORIES ('DRAWING NO. 2') - U. S. Custom House, Market & Sixteenth Streets, Wheeling, Ohio County, WV

  14. 11. Photocopy of measured drawings (from Plans of Public Buildings ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photocopy of measured drawings (from Plans of Public Buildings . . . Custom House, Post Office and Court Room (Wheeling, VA), 1855.) A. B. Young Architect 1855 PLAN AND SECTIONS SHOWING ROOF CONSTRUCTION (DRAWING NO. 5') - U. S. Custom House, Market & Sixteenth Streets, Wheeling, Ohio County, WV

  15. 7. Photocopy of measured drawings (from Plans of Public Buildings ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of measured drawings (from Plans of Public Buildings . . . Custom House, Post Office and Court Room (Wheeling, VA), 1855.) A. B. Young, Architect 1855 PLANS OF ENTRANCE STORY. CELLAR AND FOUNDATIONS ('DRAWING NO. 1') - U. S. Custom House, Market & Sixteenth Streets, Wheeling, Ohio County, WV

  16. New Americans among Us: Public Event Planning for Community Colleges.

    ERIC Educational Resources Information Center

    Weber, Gretchen Aggertt

    This report contends that public events are effective ways for community colleges to provide a venue in which the burgeoning population of immigrant Americans may have a voice. The ten successful goals to successful public-event planning are: (1) determining goals; (2) selecting a date; (3) reserving facilities; (4) creating a student planning…

  17. A framework for knowledge acquisition, representation and problem-solving in knowledge-based planning

    NASA Astrophysics Data System (ADS)

    Martinez-Bermudez, Iliana

    This research addresses the problem of developing planning knowledge-based applications. In particular, it is concerned with the problems of knowledge acquisition and representation---the issues that remain an impediment to the development of large-scale, knowledge-based planning applications. This work aims to develop a model of planning problem solving that facilitates expert knowledge elicitation and also supports effective problem solving. Achieving this goal requires determining the types of knowledge used by planning experts, the structure of this knowledge, and the problem-solving process that results in the plan. While answering these questions it became clear that the knowledge structure, as well as the process of problem solving, largely depends on the knowledge available to the expert. This dissertation proposes classification of planning problems based on their use of expert knowledge. Such classification can help in the selection of the appropriate planning method when dealing with a specific planning problem. The research concentrates on one of the identified classes of planning problems that can be characterized by well-defined and well-structured problem-solving knowledge. To achieve a more complete knowledge representation architecture for such problems, this work employs the task-specific approach to problem solving. The result of this endeavor is a task-specific methodology that allows the representation and use of planning knowledge in a structural, consistent manner specific to the domain of the application. The shell for building a knowledge-based planning application was created as a proof of concept for the methodology described in this dissertation. This shell enabled the development of a system for manufacturing planning---COMPLAN. COMPLAN encompasses knowledge related to four generic techniques used in composite material manufacturing and, given the description of the composite part, creates a family of plans capable of producing it.

  18. 24 CFR 903.15 - What is the relationship of the public housing agency plans to the Consolidated Plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... public housing agency plans to the Consolidated Plan? 903.15 Section 903.15 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING AGENCY PLANS PHA Plans §...

  19. 24 CFR 903.15 - What is the relationship of the public housing agency plans to the Consolidated Plan?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... public housing agency plans to the Consolidated Plan? 903.15 Section 903.15 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING AGENCY PLANS PHA Plans §...

  20. 24 CFR 903.15 - What is the relationship of the public housing agency plans to the Consolidated Plan?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... public housing agency plans to the Consolidated Plan? 903.15 Section 903.15 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING AGENCY PLANS PHA Plans §...

  1. 24 CFR 903.15 - What is the relationship of the public housing agency plans to the Consolidated Plan?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... public housing agency plans to the Consolidated Plan? 903.15 Section 903.15 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING AGENCY PLANS PHA Plans §...

  2. 24 CFR 903.17 - What is the process for obtaining public comment on the plans?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... body must conduct a public hearing to discuss the PHA plan (either the 5-Year Plan and/or Annual Plan, as applicable) and invite public comment on the plan(s). The hearing must be conducted at a location... hearing is to take place, the PHA must: (1) Make the proposed PHA plan(s), the required attachments...

  3. 24 CFR 903.17 - What is the process for obtaining public comment on the plans?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... body must conduct a public hearing to discuss the PHA plan (either the 5-Year Plan and/or Annual Plan, as applicable) and invite public comment on the plan(s). The hearing must be conducted at a location... hearing is to take place, the PHA must: (1) Make the proposed PHA plan(s), the required attachments...

  4. 24 CFR 903.17 - What is the process for obtaining public comment on the plans?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... body must conduct a public hearing to discuss the PHA plan (either the 5-Year Plan and/or Annual Plan, as applicable) and invite public comment on the plan(s). The hearing must be conducted at a location... hearing is to take place, the PHA must: (1) Make the proposed PHA plan(s), the required attachments...

  5. 24 CFR 903.17 - What is the process for obtaining public comment on the plans?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... body must conduct a public hearing to discuss the PHA plan (either the 5-Year Plan and/or Annual Plan, as applicable) and invite public comment on the plan(s). The hearing must be conducted at a location... hearing is to take place, the PHA must: (1) Make the proposed PHA plan(s), the required attachments...

  6. Public Reporting of Quality Information on Medicaid Health Plans

    PubMed Central

    Felt-Lisk, Suzanne; Barrett, Allison; Nyman, Rebecca

    2007-01-01

    Transparency through public reporting of quality data is key to achieving the Institute of Medicine's (IOM) vision for 21st century health care. This article reviews the status of States' voluntary public reporting of Medicaid managed care (MMC) quality data, and analyzes these data. Twenty-one States, including 17 of the 20 largest managed care States, have made plan-level data publicly available online, although the data are sometimes thin, with few measures reported, hard-to-access, and old. We conclude that CMS could better leverage the power of public reporting for quality improvement (QI) by increasing the visibility of health plan employer data and information set (HEDIS®) data that States already collect. PMID:17645152

  7. [The acquisition of schemata about location of urban facilities in public space].

    PubMed

    Kawai, Miho; Murakoshi, Shin

    2003-12-01

    The purpose of this study is to investigate acquisition of schemata about location of urban facilities. Materials were photos of public space, in which one of three urban facilities (a mailbox, a public-telephone, and a coin--operated locker) were removed by photo-retouching software. The task was to choose the most suitable urban facility for each corrected-photo and to locate it at the most suitable position on the photo. Among three participant groups (primary school 3rd grade: n = 153, primary school 5th grade: n = 118, undergraduate: n = 250), undergraduates chose the most suitable urban facility, and their located position was more concentrated. The results suggest that participants acquire the schemata and use them for inference. Although even 3rd grade children have acquired the schema to some extent, the adults have more detailed schemata of urban facilities in public space. PMID:15029755

  8. 78 FR 25484 - Public Access to Federally Supported Research and Development Data and Publications: Two Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... Public Access to Federally Supported Research and Development Data and Publications: Two Planning... Human Services, Agency for Healthcare Research and Quality, Centers for Disease Control and Prevention... Access to the Results of Federally Funded Research, released by the Office of Science and...

  9. Evaluating the Return in Ecosystem Services from Investment in Public Land Acquisitions

    PubMed Central

    Kovacs, Kent; Polasky, Stephen; Nelson, Erik; Keeler, Bonnie L.; Pennington, Derric; Plantinga, Andrew J.; Taff, Steven J.

    2013-01-01

    We evaluate the return on investment (ROI) from public land conservation in the state of Minnesota, USA. We use a spatially-explicit modeling tool, the Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST), to estimate how changes in land use and land cover (LULC), including public land acquisitions for conservation, influence the joint provision and value of multiple ecosystem services. We calculate the ROI of a public conservation acquisition as the ratio of the present value of ecosystem services generated by the conservation to the cost of the conservation. For the land scenarios analyzed, carbon sequestration services generated the greatest benefits followed by water quality improvements and recreation opportunities. We found ROI values ranged from 0.21 to 5.28 depending on assumptions about future land use change, service values, and discount rate. Our study suggests conservation is a good investment as long as investments are targeted to areas with low land costs and high service values. PMID:23776429

  10. Design techniques for developing a computerized instrumentation test plan. [for wind tunnel test data acquisition system

    NASA Technical Reports Server (NTRS)

    Burnett, S. Kay; Forsyth, Theodore J.; Maynard, Everett E.

    1987-01-01

    The development of a computerized instrumentation test plan (ITP) for the NASA/Ames Research Center National Full Scale Aerodynamics Complex (NFAC) is discussed. The objective of the ITP program was to aid the instrumentation engineer in documenting the configuration and calibration of data acquisition systems for a given test at any of four low speed wind tunnel facilities (Outdoor Aerodynamic Research Facility, 7 x 10, 40 x 80, and 80 x 120) at the NFAC. It is noted that automation of the ITP has decreased errors, engineering hours, and setup time while adding a higher level of consistency and traceability.

  11. NASA activities and plans. [on satellite tracking, data acquisition, communication and mission control systems and capabilities

    NASA Technical Reports Server (NTRS)

    Smylie, R. E.

    1981-01-01

    An overview is provided of the NASA tracking, data acquisition, communications, and mission control systems and capabilities. These systems include the NASA Spaceflight Tracking and Data Network (STDN) which supports earth-orbital spacecraft, the Deep Space Network (DSN) which supports the planetary exploration and deep space missions, and the Tracking and Data Relay Satellite System (TDRSS) currently under development and scheduled to come into service in 1983. TDRSS will then displace STDN for support of low earth orbital spacecraft. A description is presented of the current status of the considered systems, and plans are discussed for future developments and new capabilities.

  12. 12. Photocopy of measured drawings (from Plans of Public Buildings ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photocopy of measured drawings (from Plans of Public Buildings . . . Custom House, Post Office and Court Room (Wheeling, VA), 1855.) A. B. Young, Architect 1855 ELEVATIONS AND SECTIONS OF DETAILS OF DOORS, WINDOWS, AND MOULDINGS ('DRAWING NO. 6') - U. S. Custom House, Market & Sixteenth Streets, Wheeling, Ohio County, WV

  13. 9. Photocopy of measured drawings (from Plans of Public Buildings ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of measured drawings (from Plans of Public Buildings . . . Custom House, Post Office and Court Room (Wheeling, VA), 1855.) A. B. Young, Architect 1855 ELEVATIONS OF FRONT AND END FACADES - U. S. Custom House, Market & Sixteenth Streets, Wheeling, Ohio County, WV

  14. 15. Photocopy of measured drawings (from Plans of Public Buildings ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photocopy of measured drawings (from Plans of Public Buildings . . . Custom House, Post Office and Court Room (Wheeling, VA), 1855.) A. B. Young, Architect 1855 ELEVATIONS AND SECTIONS OF DETAILS OF STEPS, DOORS AND WINDOWS - U. S. Custom House, Market & Sixteenth Streets, Wheeling, Ohio County, WV

  15. 6. Photocopy from portfolio of measured drawings (Plans of Public ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy from portfolio of measured drawings (Plans of Public Buildings in Course of Construction Under the Direction of the Secretary of the Treasury, Including the Specifications Thereof: Custom House, Post Office and Court Room (Wheeling, VA), 1855.) 1855 TITLE PAGE - U. S. Custom House, Market & Sixteenth Streets, Wheeling, Ohio County, WV

  16. 14. Photocopy of measured drawings (from Plans of Public Buildings ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photocopy of measured drawings (from Plans of Public Buildings . . . Custom House, Post Office and Court Room (Wheeling, VA), 1855.) A. B. Young, Architect 1855 DETAILS OF ENTRANCE STORY, SHOWING ELEVATIONS AND SECTIONS OF DOORS AND WINDOWS ('DRAWING NO. 8') - U. S. Custom House, Market & Sixteenth Streets, Wheeling, Ohio County, WV

  17. 10. Photocopy of measured drawings (from Plans of Public Buildings ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of measured drawings (from Plans of Public Buildings . . . Custom House, Post Office and Court Room (Wheeling, VA), 1855.) A. B. Young Architect 1855 TRANSVERSE SECTION AND LONGITUDINAL SECTION ('DRAWING NO. 4.') - U. S. Custom House, Market & Sixteenth Streets, Wheeling, Ohio County, WV

  18. Drunk Driving Public Information Program Strategies and Planning Guide.

    ERIC Educational Resources Information Center

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This guide, designed to accompany a videocassette of selected television spots is a compendium of specific drunk driving topics and issues for each of the major planning steps of a public information program. The guide is organized around these steps, which are (1) select program strategies, (2) select target audiences, (3) select media channels,…

  19. Rehabilitative Planning Services in a Public Defender's Office

    ERIC Educational Resources Information Center

    Barrasso, Judy

    1977-01-01

    Shows that a Rehabilitative Planning Services Unit can provide invaluable assistance to a Public Defender's Office and enhance the quality of representation provided to indigent defendants. Such a unit could prove to be essential, particularly in situations where the defendant is ineligible for Pretrial diversion programs. (Author)

  20. Arlington Public Schools Instructional Technology Strategic Plan: April 1994.

    ERIC Educational Resources Information Center

    Carroll, James; And Others

    This document contains the instructional technology strategic plan for the Arlington Public Schools (APS) as developed by the Instructional Media & Technology (IMT) Department, which was established in 1992. The mission of this department is to support teachers, students, and related instructional staff in the effective use of instructional,…

  1. Public Fire Education Planning. A Five Step Process.

    ERIC Educational Resources Information Center

    Stamps, Jeff; And Others

    This manual describes a systematic approach to designing, implementing, and evaluating public fire education programs. An introductory section discusses use of the planning process that has a starting point and five basic steps. The second section focuses on the starting point--establishing responsibility in two major areas as well as…

  2. Ghosts in the machine: publication planning in the medical sciences.

    PubMed

    Sismondo, Sergio

    2009-04-01

    Publication of pharmaceutical company-sponsored research in medical journals, and its presentation at conferences and meetings, is mostly governed by 'publication plans' that extract the maximum amount of scientific and commercial value out of data and analyses through carefully constructed and placed papers. Clinical research is typically performed by contract research organizations, analyzed by company statisticians, written up by independent medical writers, approved and edited by academic researchers who then serve as authors, and the whole process organized and shepherded through to journal publication by publication planners. This paper reports on a conference of an international association of publication planners. It describes and analyzes their work in an ecological framework that relates it to marketing departments of pharmaceutical companies, medical journals and publishers, academic authors, and potential audiences. The medical research described here forms a new kind of corporate science, designed to look like traditional academic work, but performed largely to market products. PMID:19831220

  3. 78 FR 61251 - The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ...The Federal Transit Administration (FTA) is issuing this consolidated advance notice of proposed rulemaking (ANPRM) to request public comments on a wide range of topics pertaining to the new Public Transportation Safety Program (National Safety Program) and the requirements of the new transit asset management provisions (National TAM System) authorized by the Moving Ahead for Progress in the......

  4. NOAA Plans for Improving Public Access to Science Research (Invited)

    NASA Astrophysics Data System (ADS)

    de la Beaujardiere, J.

    2013-12-01

    The White House Office of Science and Technology Policy (OSTP) issued a memorandum on 2013 February 22 calling for federal agencies to enhance public access to research results (PARR), and required agencies to submit, within 6 months of the memo, draft plans explaining how they would implement the requirements. For the National Oceanic and Atmospheric Administration (NOAA), research results include digital data about the Earth's environment and publications based on those data. Regarding environmental data, NOAA is already very active in ensuring and improving public access. Indeed, National Weather Service (NWS) data was highlighted as one of the good examples in the OSTP memo. More generally, the NOAA National Data Centers, the Environmental Data Management Committee (EDMC), and scientific and technical personnel across the agency are striving to ensure NOAA data are discoverable and accessible on-line, well-documented and formatted for usability, and preserved for future generations as a national asset. This presentation will describe current and potential activities in support of public access to NOAA and NOAA-funded environmental data. Regarding publications, there is greater uncertainty. The fundamental issue is how to ensure no-cost access (after an embargo period) to publications that typically require subscriptions. That issue must be addressed at the interagency level with the journal publishers. The plan indicates that NOAA will adopt shared mechanisms and agreements to the extent possible rather than building new systems. Some elements remain under discussion; this presentation will be limited to those aspects on which there is general agreement.

  5. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    SciTech Connect

    MERCADO, L.C.

    2000-04-22

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects.

  6. 77 FR 4824 - Notice of Revised Information Collection for Public Comment; Consolidated Plan & Annual...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-31

    ... URBAN DEVELPOMENT Notice of Revised Information Collection for Public Comment; Consolidated Plan & Annual Performance Report AGENCY: Office of the Assistant Secretary for Community Planning and... information collection requirements for Consolidated Planning for Community Planning and Development...

  7. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  8. Strategic planning for public health practice using macroenvironmental analysis.

    PubMed Central

    Ginter, P M; Duncan, W J; Capper, S A

    1991-01-01

    Macroenvironmental analysis is the initial stage in comprehensive strategic planning. The authors examine the benefits of this type of analysis when applied to public health organizations and present a series of questions that should be answered prior to committing resources to scanning, monitoring, forecasting, and assessing components of the macroenvironment. Using illustrations from the public and private sectors, each question is examined with reference to specific challenges facing public health. Benefits are derived both from the process and the outcome of macroenvironmental analysis. Not only are data acquired that assist public health professionals to make decisions, but the analytical process required assures a better understanding of potential external threats and opportunities as well as an organization's strengths and weaknesses. Although differences exist among private and public as well as profit and not-for-profit organizations, macroenvironmental analysis is seen as more essential to the public and not-for-profit sectors than the private and profit sectors. This conclusion results from the extreme dependency of those areas on external environmental forces that cannot be significantly influenced or controlled by public health decision makers. PMID:1902305

  9. Confronting the Challenges in Reconnecting Urban Planning and Public Health

    PubMed Central

    Corburn, Jason

    2004-01-01

    Although public health and urban planning emerged with the common goal of preventing urban outbreaks of infectious disease, there is little overlap between the fields today. The separation of the fields has contributed to uncoordinated efforts to address the health of urban populations and a general failure to recognize the links between, for example, the built environment and health disparities facing low-income populations and people of color. I review the historic connections and lack thereof between urban planning and public health, highlight some challenges facing efforts to recouple the fields, and suggest that insights from ecosocial theory and environmental justice offer a preliminary framework for reconnecting the fields around a social justice agenda. PMID:15053998

  10. 45 CFR 400.58 - Content and submission of public/private RCA plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 2 2013-10-01 2012-10-01 true Content and submission of public/private RCA plan... RESETTLEMENT PROGRAM Refugee Cash Assistance § 400.58 Content and submission of public/private RCA plan. (a) States and local resettlement agencies must develop a public/private RCA plan which describes how...

  11. 45 CFR 400.58 - Content and submission of public/private RCA plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 2 2012-10-01 2012-10-01 false Content and submission of public/private RCA plan... RESETTLEMENT PROGRAM Refugee Cash Assistance § 400.58 Content and submission of public/private RCA plan. (a) States and local resettlement agencies must develop a public/private RCA plan which describes how...

  12. Publication planning: an effective corporate strategy to influence health professionals.

    PubMed

    2013-12-01

    Pharmaceutical companies integrate scientific publications into the communication strategies they employ to influence the practices of health professionals. In their"publication plan", pharmaceutical companies, or the communication agencies they hire, develop key messages to promote their drugs and then plan in advance how, when and where to disseminate them in medical journals or at conferences. Although their true intent is promotional, these messages must appear to be purely scientific, and are therefore disseminated as research articles, review articles, editorials, commentaries. Publication planning involves the use of "ghost" authors who work directly for pharmaceutical companies, but whose contribution is rarely acknowledged in the final published article. Key opinion leaders are recruited as the honorary authors of these articles, to which they have made little, if any, contribution. The criteria for authorship set by journals that publish primary research articles do not provide adequate protection against the practice of ghost and honorary authorship. Certain journals publishing primary research derive a large proportion of their revenue from selling reprints used by pharmaceutical companies to promote their drugs, especially by their sales representatives. PMID:24600737

  13. Mission planning for operational data acquisition campaigns with the {sup casi}

    SciTech Connect

    Wulder, M.; Mah, S.; Trudeau, D.

    1996-11-01

    The compact airborne spectrographic imager (casi) is a pushbroom style airborne remote sensing instrument which has been used for a variety of applications suited to its high performance, portability, flexibility in choice of spectral bands and imaging combinations, image geocoding capabilities, low-cost data acquisition, and relative ease of use and processing. As the casi may be configured to operate in either spatial or spectral mode the user decides which is most appropriate for the needs of a particular study. Spatial mode is appropriate for identifying and mapping attributes spatially using a priori spectral knowledge whereas spectral mode is well suited to identifying detailed spectral characteristics of a feature. The hyperspectral acquisition mode is a combination of both spatial and spectral operations, where contiguous spatial and spectral information are collected. The array of imaging possibilities provided by the casi requires the user to make many decisions. Yet, the options provided by the casi are not the only issues that need to be addressed pre-flight. Other considerations are flight azimuth, positioning of flight lines, sun angle, differential correction of airborne GPS data, and possible collection of pseudo-invariant features (PIFs) with a spectroradiometer. The above issues need to be addressed to reduce sun {open_quotes}hot spots{close_quotes}, sun glint, minimize bidirectional effects, and improve image mosaicking. Data may be acquired to optimize use of a downwelling irradiance sensor, real-time attitude sensing using either a vertical gyroscope or Inertial Navigation System, and differential GPS measurements. The goal of this paper is to provide a general {open_quotes}guide{close_quotes} for airborne casi remote sensing mission planning that will facilitate the acquisition of quality imagery for forestry, water, environmental, and mapping applications. 36 refs., 1 fig., 2 tabs.

  14. 24 CFR 903.4 - What are the public housing agency plans?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...? (a) Types of plans. There are two public housing agency plans. They are: (1) The 5-Year Plan (the 5-Year Plan) that a public housing agency (PHA) must submit to HUD once every five PHA fiscal years. The 5-Year Plan covers the five PHA fiscal years immediately following the date on which the 5-Year...

  15. 24 CFR 903.4 - What are the public housing agency plans?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...? (a) Types of plans. There are two public housing agency plans. They are: (1) The 5-Year Plan (the 5-Year Plan) that a public housing agency (PHA) must submit to HUD once every five PHA fiscal years. The 5-Year Plan covers the five PHA fiscal years immediately following the date on which the 5-Year...

  16. 24 CFR 903.4 - What are the public housing agency plans?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...? (a) Types of plans. There are two public housing agency plans. They are: (1) The 5-Year Plan (the 5-Year Plan) that a public housing agency (PHA) must submit to HUD once every five PHA fiscal years. The 5-Year Plan covers the five PHA fiscal years immediately following the date on which the 5-Year...

  17. 24 CFR 903.4 - What are the public housing agency plans?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...? (a) Types of plans. There are two public housing agency plans. They are: (1) The 5-Year Plan (the 5-Year Plan) that a public housing agency (PHA) must submit to HUD once every five PHA fiscal years. The 5-Year Plan covers the five PHA fiscal years immediately following the date on which the 5-Year...

  18. Large-scale demonstration test plan for digface data acquisition system

    SciTech Connect

    Roybal, L.G.; Svoboda, J.M.

    1994-11-01

    Digface characterization promotes the use of online site characterization and monitoring during waste retrieval efforts, a need that arises from safety and efficiency considerations during the cleanup of a complex waste site. Information concerning conditions at the active digface can be used by operators as a basis for adjusting retrieval activities to reduce safety risks and to promote an efficient transition between retrieval and downstream operations. Most importantly, workers are given advance warning of upcoming dangerous conditions. In addition, detailed knowledge of digface conditions provides a basis for selecting tools and methods that avoid contamination spread and work stoppages. In FY-94, work began in support of a largescale demonstration coordinating the various facets of a prototype digface remediation operation including characterization, contaminant suppression, and cold waste retrieval. This test plan describes the activities that will be performed during the winter of FY-95 that are necessary to assess the performance of the data acquisition and display system in its initial integration with hardware developed in the Cooperative Telerobotic Retrieval (CTR) program. The six specific objectives of the test are determining system electrical noise, establishing a dynamic background signature of the gantry crane and associated equipment, determining the resolution of the overall system by scanning over known objects, reporting the general functionality of the overall data acquisition system, evaluating the laser topographic functionality, and monitoring the temperature control features of the electronic package.

  19. A Study Of The Potential For Digital Radiographic Data Acquisition For Radiation Therapy Treatment Planning

    NASA Astrophysics Data System (ADS)

    Edwards, M.; Keller, J.; Hobson, G.

    1983-12-01

    While the quantitative nature of digital fluroscopic and digital radiographic imaging would seem to make possible many radiotherapeutic applications, significant problems must first be solved. The purpose of this study is to examine the potential benefits of digital imaging in radiation therapy, identify what problems must be solved to attain these benefits, and attempt to make some assessment as to the relative merits of developing such technologies. Among the potential benefits are ability to do contrast-subtraction studies for tumor and/or normal structure localization and portal placement, digital simulation of portal placement and treatment delivery, spatial localization and digitization of inhomogeneity boundaries, spatial localization and digitization of brachytherapy sources, and quantitative inhomogeneity acquisition for dosimetry calculations. Significant problems which must be solved include image receptor size limitations, image acquisition geometry related spatial distortion, three dimensional region calculation from limited views, and physical interpretation of digital image grey levels. Maximal benefits of digital imaging in radiation oncology is likely to be obtained by the development of large area image receptors for use in therapy simulators with direct data link to a combined image-analysis/treatment planning computer.

  20. Publicity and education are fundamental to China's family planning programme.

    PubMed

    Zou, P

    1987-04-01

    This article summarizes and discusses the documents concerning family planning promulgated by the Communist Party, National People's Congress and the Government of China since the start of China's family planning program. In 1955 a document was issued entitled the Directive Concerning Population Control pointing out that the public should be made aware of birth control. In 1965 the summary of the 2nd Conference on Urban Work discussed ways of explaining the significance of family planning, to make it a voluntary action of the people. In 1980 the necessity of 1 child per couple was pointed out and policies were formulated regarding ideological and political education. During the 80's several documents were issued which stressed the voluntariness and initiative of the people in practicing birth control, and that any type of coercion was prohibited. For 30 years the fundamental practice of strengthening publicity and education and opposing coercion has remained unchanged no matter how birth policies have been scored in population control since 1979. PMID:12341203

  1. Astronomical Interlibrary Cooperation: The Long and Difficult Plan for Coordinated Acquisition of Journals -- the Italian Case

    NASA Astrophysics Data System (ADS)

    Gasperini, A.; Abrami, L.; Olostro Cirella, E.

    2007-10-01

    Until 2002, the Italian astronomical observatories were independent research institutes. Their libraries, though different in their origins and history, shared common bibliographical materials, users and aims. This situation prompted a first experience of unofficial cooperation between astronomical observatory libraries, which produced outstanding results, in particular a detailed survey of the nature, cost and use of scientific journals. Starting from 2002, when the 12 observatories merged into a single institution, the National Institute for Astrophysics (INAF), the experience of cooperation between the libraries became official. The INAF headquarters, in fact, has recently established the Library Documentary and Archive Service of the National Institute for Astrophysics (SBDA-INAF) in order to have a centralized astronomical bibliographical service and to promote cooperation among libraries. At the end of 2004, following the INAF rearrangement, 5 Institutes of the National Research Council (CNR) joined the still new organization introducing further complications. In this work we explain all the problems faced by a working group to elaborate an efficient plan of coordinated acquisition of journals: the difficulties in coordinating 17 different sites distributed over the whole national territory, the not so easy negotiation with the publishers, the choice between e-only or print & online and, last but not least, the psychological impact on the scientific community. The cooperation among Italian astronomical libraries was a plan begun many years ago and has continued through various events over the years. This presentation takes into consideration the various stages of our project focusing on some crucial aspects.

  2. 48 CFR 2905.402 - General public.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false General public. 2905.402 Section 2905.402 Federal Acquisition Regulations System DEPARTMENT OF LABOR ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Release Of Information 2905.402 General public. (a) Unless the HCA...

  3. 48 CFR 2905.402 - General public.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false General public. 2905.402 Section 2905.402 Federal Acquisition Regulations System DEPARTMENT OF LABOR ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Release Of Information 2905.402 General public. (a) Unless the HCA...

  4. 48 CFR 2905.402 - General public.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false General public. 2905.402 Section 2905.402 Federal Acquisition Regulations System DEPARTMENT OF LABOR ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Release Of Information 2905.402 General public. (a) Unless the HCA...

  5. Social Impact Management Plans: Innovation in corporate and public policy

    SciTech Connect

    Franks, Daniel M.; Vanclay, Frank

    2013-11-15

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  6. Strategies and Exemplars for Public Outreach Events: Planning, Implementation, Evaluation

    NASA Astrophysics Data System (ADS)

    Cobb, W. H.; Buxner, S.; Shipp, S. S.; Shebby, S.

    2015-12-01

    IntroductionEach year the National Aeronautics and Space Administration (NASA) sponsors a variety of public outreach events to share information with educators, students, and the general public. These events are designed to increase interest in and awareness of the mission and goals of NASA. Planning and implementation best practices gleaned from the NASA SMD Education's review of large-scale events, "Best Practices in Outreach Events" will be shared. Outcomes from an event, i C Ceres, celebrating the Dawn mission's arrival at dwarf planet Ceres that utilized these strategies will be shared. Best practices included can be pertinent for all event organizers and evaluators regardless of event size. BackgroundThe literature review focused on identifying evaluations of large-scale public outreach events—and, within these evaluations, identifying best practices. The following criteria for identifying journal articles and reports to potentially include: Public, science-related events open to adults and children. Events with more than 1,000 attendees. Events that occurred during the last 5 years. Evaluations that included information on data collected from visitors and/or volunteers. Evaluations that specified the type of data collected, methodology, and associated results. Planning and Implementation Best PracticesThe literature review revealed key considerations for planning and of large-scale events implementing events. A summary of related best practices is presented below. 1) Advertise the event 2) Use and advertise access to scientists 3) Recruit scientists using these findings 4) Ensure that the event is group and particularly child friendly 5) Target specific event outcomes Best Practices Informing Real-world Planning, Implementation and EvaluationDawn mission's collaborative design of a series of events, i C Ceres, including in-person, interactive events geared to families and live presentations will be shared. Outcomes and lessons learned will be imparted

  7. [Public health program planning through the capabilities lens].

    PubMed

    Breton, E; Sherlaw, W

    2013-06-01

    As a theory of distributive justice, Amartya Sen's theory of capabilities questions the choices and decisions associated with the development and planning of public health programs. In this paper, the authors describe Sen's approach and explore its implications for public health by applying it to the case of tobacco control programs. Based on the tobacco control objectives set by the WHO and on the MPOWER package of measures, they notice that the translation of the objectives in capabilities call for a greater attention to the conditions of living of the different population groups. It also put into doubt the measures restricting access to tobacco products that do not account for their differing impacts on adults. The authors conclude that this ethical perspective is likely to be controversial as it may rank freedom as a value that overrides health. PMID:23684105

  8. 25 CFR 170.436 - How are public hearings for IRR planning and projects funded?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are public hearings for IRR planning and projects... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Public Hearings § 170.436 How are public hearings for IRR planning and projects...

  9. Earth Observing System/Advanced Microwave SoundingUnit-A (EOS/AMSU-A): Acquisition activities plan

    NASA Technical Reports Server (NTRS)

    Schwantje, Robert

    1994-01-01

    This is the acquisition activities plan for the software to be used in the Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) system. This document is submitted in response to Contract NAS5-323 14 as CDRL 508. The procurement activities required to acquire software for the EOS/AMSU-A program are defined.

  10. 76 FR 9044 - Notice of Extension of Information Collection for Public Comment; Consolidated Plan and Annual...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-16

    ... URBAN DEVELOPMENT Notice of Extension of Information Collection for Public Comment; Consolidated Plan and Annual Performance Report AGENCY: Office of the Assistant Secretary for Community Planning and... proposed extension of information collection requirements for Consolidated Planning for Community...

  11. Worldview and route planning using live public cameras

    NASA Astrophysics Data System (ADS)

    Kaseb, Ahmed S.; Chen, Wenyi; Gingade, Ganesh; Lu, Yung-Hsiang

    2015-03-01

    Planning a trip needs to consider many unpredictable factors along the route such as traffic, weather, accidents, etc. People are interested viewing the places they plan to visit and the routes they plan to take. This paper presents a system with an Android mobile application that allows users to: (i) Watch the live feeds (videos or snapshots) from more than 65,000 geotagged public cameras around the world. The user can select the cameras using an interactive world map. (ii) Search for and watch the live feeds from the cameras along the route between a starting point and a destination. The system consists of a server which maintains a database with the cameras' information, and a mobile application that shows the camera map and communicates with the cameras. In order to evaluate the system, we compare it with existing systems in terms of the total number of cameras, the cameras' coverage, and the number of cameras on various routes. We also discuss the response time of loading the camera map, finding the cameras on a route, and communicating with the cameras.

  12. Public Participation, Education, and Engagement in Drought Planning

    NASA Astrophysics Data System (ADS)

    Bathke, D. J.; Wall, N.; Haigh, T.; Smith, K. H.; Bernadt, T.

    2014-12-01

    Drought is a complex problem that typically goes beyond the capacity, resources, and jurisdiction of any single person, program, organization, political boundary, or sector. Thus, by nature, monitoring, planning for, and reducing drought risk must be a collaborative process. The National Drought Mitigation Center, in partnership with the National Integrated Drought Information System (NIDIS) Program Office and others, provides active engagement and education drought professionals, stakeholders, and the general public about managing drought-related risks through resilience planning, monitoring, and education. Using case studies, we discuss recruitment processes, network building, participation techniques, and educational methods as they pertain to a variety of unique audiences with distinct objectives. Examples include collaborative decision-making at a World Meteorological Organization conference; planning, and peer-learning among drought professionals in a community of practice; drought condition monitoring through citizen science networks; research and education dissemination with stakeholder groups; and informal learning activities for all ages. Finally, we conclude with evaluation methods, indicators of success, and lessons learned for increasing the effectiveness of our programs in increasing drought resilience.

  13. An economic analysis of health plan conversions: are they in the public interest?

    PubMed

    Beaulieu, Nancy Dean

    2004-01-01

    Over the last decade, managed-care companies have been consolidating on both a regional and national scale. More recently, nonprofit health plans have been converting to for-profit status, and this conversion has frequently occurred as a step to facilitate merger or acquisition with a for-profit company. Some industry observers attribute these managed-care marketplace trends to an industry shakeout resulting from increased competition in the sector. At the same time, these perceived competitive pressures have led to questions about the long-run viability of nonprofit health plans. Furthermore, some industry and government leaders believe that some nonprofits are already conducting themselves like for-profit health plans and question the state premium tax exemption ordinarily accorded to such plans. This paper examines related health policy issues through the lens of a case study of the proposed conversion of the CareFirst Blue Cross Blue Shield company to a for-profit public-stock company and its merger with the Wellpoint Corporation. Company executives and board members argued that CareFirst lacked access to sufficient capital and faced serious threats to its viability as a financially healthy nonprofit health care company. They also argued that CareFirst and its beneficiaries would benefit from merger through enhanced economies of scale and product-line extensions. Critics of the proposed conversion and merger raised concerns about the adverse impacts on access to care, coverage availability, quality of care, safety-net providers, and the cost of health insurance. Analyses demonstrate that CareFirst wields substantial market power in its local market, that it is unlikely to realize cost savings through expanded economies of scale, and that access to capital concerns are largely driven by the perceived need for further expansion through merger and acquisition. Although it is impossible to predict future changes in quality of care for CareFirst, analyses suggest

  14. 48 CFR 605.202-70 - Foreign acquisitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requirement to obtain competition as required by FAR part 6 and DOSAR (48 CFR) part 606. Competition... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Foreign acquisitions. 605... ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopsis of Proposed Contract Actions 605.202-70...

  15. 41 CFR 102-37.370 - Do liquidation plans require public notice?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Do liquidation plans... Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 37....370 Do liquidation plans require public notice? Yes, a liquidation plan constitutes a major...

  16. Planning for a New Generation of Public Library Buildings. The Greenwood Library Management Collection.

    ERIC Educational Resources Information Center

    McCabe, Gerard B.

    This book on public library design and construction contains the following chapters: (1) "Beginning the Plan"; (2) "Data for Planning"; (3) "Location: Finding a Site"; (4) "Interior Design"; (5) "Furnishing and Equipping the Library and Its Environs"; (6) "Other Views," including "Using Small College Library Planning Techniques in Public Library…

  17. Adults with Special Needs. A Resource and Planning Guide for Wisconsin's Public Libraries.

    ERIC Educational Resources Information Center

    Huntington, Barbara; Swanson, Coral

    This publication is intended to assist Wisconsin's public libraries and public library systems in providing service to adults with special needs (ASN). Twelve chapters cover the following topics: (1) planning for success, including planning services and measuring progress; (2) a Wisconsin vision for the future, including creating the vision and…

  18. Greening the Department of Energy through waste prevention, recycling, and Federal acquisition. Strategic plan to implement Executive Order 13101

    SciTech Connect

    2000-11-01

    This Plan provides strategies and milestones to implement Executive Order 13101, Greening the Government Through Waste Prevention, Recycling, and Federal Acquisition, and to achieve the new Secretarial goals for 2005 and 2010. It serves as the principal Secretarial guidance to Department of Energy (DOE) Headquarters, Field Offices, and laboratory and contractor staff to improve sanitary waste prevention, recycling, and the purchase and use of recycled content and environmentally preferable products and services in the DOE.

  19. Sustainable NREL - Site Sustainability Plan FY 2015 (Management Publication)

    SciTech Connect

    Not Available

    2015-01-01

    NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

  20. 77 FR 56645 - Federal Acquisition Regulation; Information Collection; Accident Prevention Plans and Recordkeeping

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... Regulation; Information Collection; Accident Prevention Plans and Recordkeeping AGENCY: Department of Defense... reinstatement of a previously approved information collection requirement concerning Accident Prevention Plans... 9000- 0060, Accident Prevention Plans and Recordkeeping by any of the following methods:...

  1. 48 CFR 5.404 - Release of long-range acquisition estimates.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Release of long-range... REGULATION ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Release of Information 5.404 Release of long... may be desirable to publicize estimates of unclassified long-range acquisition requirements....

  2. 48 CFR 5.404 - Release of long-range acquisition estimates.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Release of long-range... REGULATION ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Release of Information 5.404 Release of long... may be desirable to publicize estimates of unclassified long-range acquisition requirements....

  3. 48 CFR 5.404 - Release of long-range acquisition estimates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Release of long-range... REGULATION ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Release of Information 5.404 Release of long... may be desirable to publicize estimates of unclassified long-range acquisition requirements....

  4. 48 CFR 5.404 - Release of long-range acquisition estimates.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Release of long-range... REGULATION ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Release of Information 5.404 Release of long... may be desirable to publicize estimates of unclassified long-range acquisition requirements....

  5. 48 CFR 1505.203 - Publicizing and response time.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Publicizing and response time. 1505.203 Section 1505.203 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopses of Proposed Contract Actions 1505.203 Publicizing and response time. (a) The...

  6. 48 CFR 1505.203 - Publicizing and response time.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Publicizing and response time. 1505.203 Section 1505.203 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopses of Proposed Contract Actions 1505.203 Publicizing and response time. (a) The...

  7. Nantucket, Ma. Climate Protection Action Plan: A Public Outreach Strategy

    NASA Astrophysics Data System (ADS)

    Petrik, C.; Stephenson, A.; Petsch, S.

    2009-12-01

    As communities and municipalities gain a better understanding of climate change, they are exploring the ways in which to work towards adaptation and mitigation. One strategy that the Island of Nantucket, Massachusetts turned toward is the drafting of a Climate Protection Action Plan (CPAP). The CPAP was developed during the summer of 2009 to meet three goals: (1) assist the Town of Nantucket in creating a framework to help them reduce CO2 emissions; (2) educate the municipality and community in techniques that promote energy efficiency and sustainability on the island; and (3) document past, present and future approaches adopted by the Town towards emissions reduction and energy sustainability. In particular, this project focused on using local strengths and natural resources identified by island stakeholders that may help the island to mitigate carbon emissions and adapt to climate change.. Drafting the CPAP provided community members and politicians with an opportunity to become better educated in the science of climate change and to learn how climate change will affect their community. On the island of Nantucket, leaders in the religious, civic, and political communities were brought into a conversation about how each group could contribute to reducing greenhouse gas emissions. A geosciences graduate student was brought into the CPAP team as a climate fellow to facilitate this conversation. This provided the foundation for stakeholder recommendations incorporated into the CPAP. This capacity-building model served as an effective way to create an informal learning environment about climate change that allowed members of the island community to directly participate in developing their locally appropriate climate protection strategy. The draft CPAP developed through this study and presented to the Town of Nantucket comprises assessments and recommendations in public research and education; building and energy efficiency; transportation; renewable energy; and carbon

  8. 45 CFR 1703.207 - Change in meeting plans after public announcement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Change in meeting plans after public announcement. 1703.207 Section 1703.207 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE GOVERNMENT IN THE SUNSHINE ACT Procedures Governing...

  9. 45 CFR 1703.207 - Change in meeting plans after public announcement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Change in meeting plans after public announcement. 1703.207 Section 1703.207 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE GOVERNMENT IN THE SUNSHINE ACT Procedures Governing...

  10. 45 CFR 1703.207 - Change in meeting plans after public announcement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Change in meeting plans after public announcement. 1703.207 Section 1703.207 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE GOVERNMENT IN THE SUNSHINE ACT Procedures Governing...

  11. 45 CFR 1703.207 - Change in meeting plans after public announcement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Change in meeting plans after public announcement. 1703.207 Section 1703.207 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE GOVERNMENT IN THE SUNSHINE ACT Procedures Governing...

  12. 45 CFR 1703.207 - Change in meeting plans after public announcement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Change in meeting plans after public announcement. 1703.207 Section 1703.207 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE GOVERNMENT IN THE SUNSHINE ACT Procedures Governing Decisions About Meetings § 1703.207 Change...

  13. 2 CFR Appendix D to Part 225 - Public Assistance Cost Allocation Plans

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... Definitions 1. State public assistance agency 2. State public assistance agency costs C. Policy D. Submission..., submission, negotiation, and approval of public assistance cost allocation plans in Subpart E of 45 CFR part... services and goods provided directly to program recipients. C. Policy. State public assistance...

  14. 7 CFR Exhibit B to Subpart B of... - Grant Agreement (Public Bodies) for Site Development and/or Site Acquisition for Housing and/or...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...—Grant Agreement (Public Bodies) for Site Development and/or Site Acquisition for Housing and/or Public... costs of housing or public facilities. This Grant Agreement covers the following described real property... Copeland “Anti-Kick Back” Act (18 USC 874) as supplemented in Department of Labor regulations (29 CFR,...

  15. 7 CFR Exhibit B to Subpart B of... - Grant Agreement (Public Bodies) for Site Development and/or Site Acquisition for Housing and/or...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...—Grant Agreement (Public Bodies) for Site Development and/or Site Acquisition for Housing and/or Public... costs of housing or public facilities. This Grant Agreement covers the following described real property... Copeland “Anti-Kick Back” Act (18 USC 874) as supplemented in Department of Labor regulations (29 CFR,...

  16. 7 CFR Exhibit B to Subpart B of... - Grant Agreement (Public Bodies) for Site Development and/or Site Acquisition for Housing and/or...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...—Grant Agreement (Public Bodies) for Site Development and/or Site Acquisition for Housing and/or Public... costs of housing or public facilities. This Grant Agreement covers the following described real property... Copeland “Anti-Kick Back” Act (18 USC 874) as supplemented in Department of Labor regulations (29 CFR,...

  17. 7 CFR Exhibit B to Subpart B of... - Grant Agreement (Public Bodies) for Site Development and/or Site Acquisition for Housing and/or...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...—Grant Agreement (Public Bodies) for Site Development and/or Site Acquisition for Housing and/or Public... costs of housing or public facilities. This Grant Agreement covers the following described real property... Copeland “Anti-Kick Back” Act (18 USC 874) as supplemented in Department of Labor regulations (29 CFR,...

  18. Planning for Service. The Five-Year Plan of the Chicago Public Library/Chicago Library System. 1977-1981.

    ERIC Educational Resources Information Center

    Reich, David L.; And Others

    This five-year plan of the Chicago Public Library revises the plan of 1976-1980. Several operational/procedural objectives have been dropped and incorporated in normal operations. New goals, objectives, and tasks are service-directed with special attention to expanding services to affiliated and other cooperating Chicago libraries. The specific…

  19. Acquisition, preprocessing, and reconstruction of ultralow dose volumetric CT scout for organ-based CT scan planning

    SciTech Connect

    Yin, Zhye De Man, Bruno; Yao, Yangyang; Wu, Mingye; Montillo, Albert; Edic, Peter M.; Kalra, Mannudeep

    2015-05-15

    Purpose: Traditionally, 2D radiographic preparatory scan images (scout scans) are used to plan diagnostic CT scans. However, a 3D CT volume with a full 3D organ segmentation map could provide superior information for customized scan planning and other purposes. A practical challenge is to design the volumetric scout acquisition and processing steps to provide good image quality (at least good enough to enable 3D organ segmentation) while delivering a radiation dose similar to that of the conventional 2D scout. Methods: The authors explored various acquisition methods, scan parameters, postprocessing methods, and reconstruction methods through simulation and cadaver data studies to achieve an ultralow dose 3D scout while simultaneously reducing the noise and maintaining the edge strength around the target organ. Results: In a simulation study, the 3D scout with the proposed acquisition, preprocessing, and reconstruction strategy provided a similar level of organ segmentation capability as a traditional 240 mAs diagnostic scan, based on noise and normalized edge strength metrics. At the same time, the proposed approach delivers only 1.25% of the dose of a traditional scan. In a cadaver study, the authors’ pictorial-structures based organ localization algorithm successfully located the major abdominal-thoracic organs from the ultralow dose 3D scout obtained with the proposed strategy. Conclusions: The authors demonstrated that images with a similar degree of segmentation capability (interpretability) as conventional dose CT scans can be achieved with an ultralow dose 3D scout acquisition and suitable postprocessing. Furthermore, the authors applied these techniques to real cadaver CT scans with a CTDI dose level of less than 0.1 mGy and successfully generated a 3D organ localization map.

  20. Review Article: Recent Publications on Research Methods in Second Language Acquisition

    ERIC Educational Resources Information Center

    Ionin, Tania

    2013-01-01

    The central goal of the field of second language acquisition (SLA) is to describe and explain how second language learners acquire the target language. In order to achieve this goal, SLA researchers work with second language data, which can take a variety of forms, including (but not limited to) such commonly used methods as naturalistic…

  1. The Economic Impact of Implementing the Cincinnati Public Schools' Facilities Master Plan on Greater Cincinnati.

    ERIC Educational Resources Information Center

    Rexhausen, Jeff

    The construction proposed in the Cincinnati Public Schools' Facilities Master Plan will have a significant impact on the greater Cincinnati, Ohio, economy. Highlights include: (1) the Facilities Master Plan of the Cincinnati Public Schools envisions a 10-year program with $985 million in construction spending. The funding of this program includes…

  2. Strategic Plan to Ensure Racial and Ethnic Diversity in Connecticut Public Higher Education, 2008. Annual Report

    ERIC Educational Resources Information Center

    Connecticut Department of Higher Education (NJ1), 2008

    2008-01-01

    Increasing the participation of minority groups at public colleges and universities is a longstanding goal of the Board of Governors for Higher Education, as first outlined in its 1983 "Strategic Plan to Ensure Racial and Ethnic Diversity in Connecticut Public Higher Education." The minority groups defined by the plan are: Hispanic/Latino,…

  3. Strategic Plan to Ensure Racial and Ethnic Diversity in Connecticut Public Higher Education, 2010. Annual Report

    ERIC Educational Resources Information Center

    Connecticut Department of Higher Education (NJ1), 2010

    2010-01-01

    Increasing the participation of minority groups at public colleges and universities is a longstanding goal of the Board of Governors for Higher Education, as first outlined in its 1983 "Strategic Plan to Ensure Racial and Ethnic Diversity in Connecticut Public Higher Education". The minority groups defined by the plan are: Hispanic/Latino, African…

  4. Strategic Plan to Ensure Racial and Ethnic Diversity in Connecticut Public Higher Education, 2011. Annual Report

    ERIC Educational Resources Information Center

    Connecticut Department of Higher Education (NJ1), 2011

    2011-01-01

    Increasing the participation of minority groups at public colleges and universities is a longstanding goal of the Board of Governors for Higher Education, as first outlined in its 1983 "Strategic Plan to Ensure Racial and Ethnic Diversity in Connecticut Public Higher Education." The minority groups defined by the plan are: Hispanic/Latino,…

  5. Strategic Plan to Ensure Racial and Ethnic Diversity in Connecticut Public Higher Education, 2009. Annual Report

    ERIC Educational Resources Information Center

    Connecticut Department of Higher Education (NJ1), 2009

    2009-01-01

    Increasing the participation of minority groups at public colleges and universities is a longstanding goal of the Board of Governors for Higher Education, as first outlined in its 1983 "Strategic Plan to Ensure Racial and Ethnic Diversity in Connecticut Public Higher Education". The minority groups defined by the plan are: Hispanic/Latino, African…

  6. Legal Limitations on Public Pension Plan Reform. Conference Paper 2009-08

    ERIC Educational Resources Information Center

    Monahan, Amy B.

    2009-01-01

    There is significant interest in reforming retirement plans for public school employees, particularly in light of current market conditions. This paper presents an overview of the various types of state regulation of public pension plans that affect possibilities for reform. Several states have legal protections that effectively prevent a state…

  7. How Will Teachers Fare in Rhode Island's New Hybrid Pension Plan? Public Pension Project Brief 4

    ERIC Educational Resources Information Center

    Johnson, Richard W.; Butrica, Barbara A.; Haaga, Owen; Southgate, Benjamin G.

    2014-01-01

    Hybrid retirement plans that combine defined benefit pensions with 401(k) type, defined contribution accounts can play important roles in the reform of public-sector pensions. Summarizing results from our longer report ["How Will Rhode Island's New Hybrid Pension Plan Affect Teachers? A Report of the Public Pension Project" (2014)], this…

  8. An In-Depth Look at RACE: Creating a Public Relations Plan

    ERIC Educational Resources Information Center

    Luttrell, Regina

    2013-01-01

    This article describes an activity in which students will understand, analyze, and apply the principles learned in the RACE process (research, action, communication, and evaluation). Students should have the ability to identify the four-step public relations planning process and ultimately create a public relations plan. This two-week activity is…

  9. Bringing Public Engagement into an Academic Plan and Its Assessment Metrics

    ERIC Educational Resources Information Center

    Britner, Preston A.

    2012-01-01

    This article describes how public engagement was incorporated into a research university's current Academic Plan, how the public engagement metrics were selected and adopted, and how those processes led to subsequent strategic planning. Some recognition of the importance of civic engagement has followed, although there are many areas in which…

  10. Take To the Streets: Guide To Planning Outdoor, Public Exhibits.

    ERIC Educational Resources Information Center

    Cutting, Jennifer McGregor; And Others

    Placing exhibits in public places provides a unique opportunity to reach a broad non-museum-going audience. It offers marketing and publicity opportunities as well as the potential to develop relationships with agencies and individuals who are stakeholders in the public site. The purpose of this guidebook is to describe the steps in creating an…

  11. Public facility planning in urban villagers' community based on Public Participation GIS: a case study of Wuhan new urban areas

    NASA Astrophysics Data System (ADS)

    Li, Jun; Zeng, Zheng; Yu, Yang

    2009-10-01

    As a unique group in China's urbanization, "urban villager" is the concern of various parties of the society. From "farmers" to "urban residents", urban villagers' means of production and life style change dramatically. At present, public facility planning in urban villagers' community always fail to meet their particular demands. Taking PPGIS as an instrument, the paper analyzes the present status of public facilities in urban villagers' community and the new demand on public facilities from the changing production means and life style. The purpose is to put forward suggestions for public facility setting in urban villagers' community and offer theoretic guidance and proposal for Wuhan new urban areas. PPGIS is gradually being applied to social science researches in recent years. Through the integrated platform, it can achieve the objective of communication, coordination, cooperation and collaboration of different interests. In this research, ephemeral mapping, sketch mapping, scale mapping and aerial photographs are used to acquire spatial data of public facilities and attribute data of urban villagers in their community. Through the comparison of data, the research shows that while urban villagers in Wuhan new urban areas gradually accept city life, they inevitably maintain certain rural habits and customs. Therefore, the public facility planning in this particular kind of communities can neither be treated equal as countryside facility planning, nor simply adopt the practice in urban residential areas' planning; rather the planning system should take into account facilities of different categories at all levels, communities of different types and residential groups.

  12. NASA's Plan for Improving Public Access to Federally Funded Scientific Research (Invited)

    NASA Astrophysics Data System (ADS)

    Allen, G.

    2013-12-01

    In February, 2013, OSTP issued a policy to all Federal agencies directing those that engage in $100 million or greater of federally funded research and development expenditures to develop an agency public access plan. The plan must consider both digital scientific data and scientific publications. This talk will review how NASA is currently complying with this OSTP directive, and NASA's plan for improving the public's ability to locate and access digital data and scientific publications resulting from NASA funded research. Updating NASA's policy will occur during FY 2014 and implementation of new policies and guidance will be in place by FY 2015.

  13. Scoping study of integrated resource planning needs in the public utility sector

    SciTech Connect

    Garrick, C J; Garrick, J M; Rue, D R

    1993-06-01

    Integrated resource planning (IRP) is an approach to utility resource planning that integrates the evaluation of supply- and demand-site options for providing energy services at the least cost. Many utilities practice IRP; however, most studies about IRP focus on investor-owned utilities (IOUs). This scoping study investigates the IRP activities and needs of public utilities (not-for-profit utilities, including federal, state, municipal, and cooperative utilities). This study (1) profiles IRP-related characteristics of the public utility sector, (2) articulates the needs of public utilities in understanding and implementing IRP, and (3) identifies strategies to advance IRP principles in public utility planning.

  14. 40 CFR 60.23 - Adoption and submittal of State plans; public hearings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Adoption and submittal of State plans...) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Adoption and Submittal of State Plans for Designated Facilities § 60.23 Adoption and submittal of State plans; public hearings....

  15. 40 CFR 60.23 - Adoption and submittal of State plans; public hearings.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Adoption and submittal of State plans...) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Adoption and Submittal of State Plans for Designated Facilities § 60.23 Adoption and submittal of State plans; public hearings....

  16. Retiree Health Plans for Public School Teachers after GASB 43 and 45

    ERIC Educational Resources Information Center

    Clark, Robert L.

    2010-01-01

    Most public elementary and high school teachers are covered by health insurance provided by their employer while they are employed. In most cases, these health plans are managed at the state level. At retirement, teachers with sufficient years of service are allowed to remain in the health plan. Retiree health plans for teachers vary widely across…

  17. 40 CFR 60.23 - Adoption and submittal of State plans; public hearings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Adoption and submittal of State plans... State Plans for Designated Facilities § 60.23 Adoption and submittal of State plans; public hearings. (a... availability of a final guideline document is published under § 60.22(a), each State shall adopt and submit...

  18. 40 CFR 60.23 - Adoption and submittal of State plans; public hearings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Adoption and submittal of State plans... State Plans for Designated Facilities § 60.23 Adoption and submittal of State plans; public hearings. (a... availability of a final guideline document is published under § 60.22(a), each State shall adopt and submit...

  19. 40 CFR 60.23 - Adoption and submittal of State plans; public hearings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Adoption and submittal of State plans... State Plans for Designated Facilities § 60.23 Adoption and submittal of State plans; public hearings. (a... availability of a final guideline document is published under § 60.22(a), each State shall adopt and submit...

  20. What to Tell the Public? Information Design as Interpretation in Corridor Planning

    ERIC Educational Resources Information Center

    Lebeaux, Pamela M.

    2012-01-01

    Providing information to the public is a widely recognized function of planning. Yet little attention has been paid to how expert information is characterized for citizens participating in a planning process. The text, maps and images used to tell the story in a planning process can help to bridge the divide between experts and citizens, or act to…

  1. 7 CFR 372.8 - Major planning and decision points and public involvement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES § 372.8 Major planning and decision points and public involvement. (a) Major planning... 7 Agriculture 5 2014-01-01 2014-01-01 false Major planning and decision points and...

  2. 7 CFR 372.8 - Major planning and decision points and public involvement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES § 372.8 Major planning and decision points and public involvement. (a) Major planning... 7 Agriculture 5 2010-01-01 2010-01-01 false Major planning and decision points and...

  3. 7 CFR 372.8 - Major planning and decision points and public involvement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES § 372.8 Major planning and decision points and public involvement. (a) Major planning... 7 Agriculture 5 2012-01-01 2012-01-01 false Major planning and decision points and...

  4. 7 CFR 372.8 - Major planning and decision points and public involvement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES § 372.8 Major planning and decision points and public involvement. (a) Major planning... 7 Agriculture 5 2011-01-01 2011-01-01 false Major planning and decision points and...

  5. [Abortion: a public health or a family planning problem].

    PubMed

    Aguayo Hernandez, J R

    1991-01-01

    Institute of Social Security estimates that the rate of abortion has declined by about 25% between 1982-1990. Currently 1 of every 10 pregnancies is believed to end in induced abortion. Family planning programs have led to declines in the rates of both pregnancy and abortion in Mexico. The number of fertile-aged women attended in Social Security facilities for abortion complications declined from 11.5/1000 in 1982 to 8.8 in 1990. The extremes of opinion about whether abortion should be made safe and legal appear irreconcilably opposed. From a national perspective, abortion is a public health problem that needs to be addressed by the health sector. Existing laws permitting abortion under some circumstances should be made more explicit. The point of view of society should be respected, but women should also be protected. PMID:12317070

  6. The Funding Plan for the Illinois Public Community College System.

    ERIC Educational Resources Information Center

    Loftus, Virginia L.

    A revised funding plan for the Illinois Community College System is presented as adopted by the Illinois Board of Higher Education for implementation in the fiscal year (FY) 1981 budget process. After outlining the characteristics of the community college system, the report provides a summary of the funding plan, pointing out the advantages and…

  7. A Disaster Preparedness Plan for Small Public Libraries, 2002.

    ERIC Educational Resources Information Center

    Haines, Jan, Comp.

    The State Library of Ohio designed this disaster preparedness plan to assist small libraries in gathering information that will be invaluable in the event of an emergency. This plan, which focuses on fire and water disaster prevention, is devoted to using simple and inexpensive measures to prevent a disaster or to lessen its effect. The plan…

  8. 47 CFR 90.16 - Public Safety National Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... National Plan is contained in the Report and Order in General Docket No. 87-112. The principal spectrum... (“border regions”). In the border regions, the principal spectrum for the National Plan may be different..., and the U.S. Virgin Islands. No assignments will be made in the spectrum designated for the...

  9. 47 CFR 90.16 - Public Safety National Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... National Plan is contained in the Report and Order in General Docket No. 87-112. The principal spectrum... (“border regions”). In the border regions, the principal spectrum for the National Plan may be different..., and the U.S. Virgin Islands. No assignments will be made in the spectrum designated for the...

  10. 47 CFR 90.16 - Public Safety National Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... National Plan is contained in the Report and Order in General Docket No. 87-112. The principal spectrum... (“border regions”). In the border regions, the principal spectrum for the National Plan may be different..., and the U.S. Virgin Islands. No assignments will be made in the spectrum designated for the...

  11. 47 CFR 90.16 - Public Safety National Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... National Plan is contained in the Report and Order in General Docket No. 87-112. The principal spectrum... (“border regions”). In the border regions, the principal spectrum for the National Plan may be different..., and the U.S. Virgin Islands. No assignments will be made in the spectrum designated for the...

  12. 24 CFR 971.7 - Plan for removal of units from public housing inventories.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... rental assistance. The plan shall include: (1) A listing of the public housing units to be removed from... public housing inventories. 971.7 Section 971.7 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN...

  13. 24 CFR 971.7 - Plan for removal of units from public housing inventories.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... rental assistance. The plan shall include: (1) A listing of the public housing units to be removed from... public housing inventories. 971.7 Section 971.7 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN...

  14. 24 CFR 971.7 - Plan for removal of units from public housing inventories.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... rental assistance. The plan shall include: (1) A listing of the public housing units to be removed from... public housing inventories. 971.7 Section 971.7 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN...

  15. 45 CFR 400.58 - Content and submission of public/private RCA plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... 400.58 Section 400.58 Public Welfare Regulations Relating to Public Welfare OFFICE OF REFUGEE RESETTLEMENT, ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN SERVICES REFUGEE RESETTLEMENT PROGRAM Refugee Cash Assistance § 400.58 Content and submission of public/private RCA plan....

  16. 45 CFR 400.58 - Content and submission of public/private RCA plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... 400.58 Section 400.58 Public Welfare Regulations Relating to Public Welfare OFFICE OF REFUGEE RESETTLEMENT, ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN SERVICES REFUGEE RESETTLEMENT PROGRAM Refugee Cash Assistance § 400.58 Content and submission of public/private RCA plan....

  17. 40 CFR 256.60 - Requirements for public participation in State and substate plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Public Participation § 256.60 Requirements for public participation in State and substate..., in accord with 40 CFR 25.8, where required by this subpart or by an approved public...

  18. 40 CFR 256.60 - Requirements for public participation in State and substate plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Public Participation § 256.60 Requirements for public participation in State and substate..., in accord with 40 CFR 25.8, where required by this subpart or by an approved public...

  19. 40 CFR 256.60 - Requirements for public participation in State and substate plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Public Participation § 256.60 Requirements for public participation in State and substate..., in accord with 40 CFR 25.8, where required by this subpart or by an approved public...

  20. 2 CFR Appendix D to Part 225 - Public Assistance Cost Allocation Plans

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... provisions of Subpart E of 45 CFR part 95. D. Submission, Documentation, and Approval of Public Assistance..., AND INDIAN TRIBAL GOVERNMENTS (OMB CIRCULAR A-87) Pt. 225, App. D Appendix D to Part 225—Public... approval of public assistance cost allocation plans in Subpart E of 45 CFR part 95. All...

  1. 45 CFR 400.58 - Content and submission of public/private RCA plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 400.58 Section 400.58 Public Welfare Regulations Relating to Public Welfare OFFICE OF REFUGEE RESETTLEMENT, ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN SERVICES REFUGEE RESETTLEMENT PROGRAM Refugee Cash Assistance § 400.58 Content and submission of public/private RCA plan....

  2. Venture Capital for Educators II. The Boston Plan for Excellence in the Public Schools, 1993.

    ERIC Educational Resources Information Center

    Cilley, Pamela, Ed.; Gibbons, Charles H., Jr., Ed.

    The Boston Plan for Excellence in the Public Schools is a partnership among teachers, students, parents, administrators, and business leaders with the common purpose of restoring the Boston Public School System to its former position as a national leader in education. This publication examines the programs and activities, school by school, that…

  3. 2 CFR Appendix D to Part 225 - Public Assistance Cost Allocation Plans

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... agency 2. State public assistance agency costs C. Policy D. Submission, Documentation, and Approval of... approval of public assistance cost allocation plans in Subpart E of 45 CFR part 95. All administrative... program recipients. C. Policy. State public assistance agencies will develop, document and implement,...

  4. Implications of Public Opinion for Space Program Planning, 1980 - 2000

    NASA Technical Reports Server (NTRS)

    Overholt, W.; Wiener, A. J.; Yokelson, D.

    1975-01-01

    The effect of public opinion on future space programs is discussed in terms of direct support, apathy, or opposition, and concern about the tax burden, budgetary pressures, and national priorities. Factors considered include: the salience and visibility of NASA as compared with other issues, the sources of general pressure on the federal budget which could affect NASA, the public's opinions regarding the size and priority of NASA'S budget, the degree to which the executive can exercise leverage over NASA's budget through influencing or disregarding public opinion, the effects of linkages to other issues on space programs, and the public's general attitudes toward the progress of science.

  5. Continuous table acquisition MRI for radiotherapy treatment planning: Distortion assessment with a new extended 3D volumetric phantom

    SciTech Connect

    Walker, Amy Metcalfe, Peter; Liney, Gary; Holloway, Lois; Dowling, Jason; Rivest-Henault, David

    2015-04-15

    Purpose: Accurate geometry is required for radiotherapy treatment planning (RTP). When considering the use of magnetic resonance imaging (MRI) for RTP, geometric distortions observed in the acquired images should be considered. While scanner technology and vendor supplied correction algorithms provide some correction, large distortions are still present in images, even when considering considerably smaller scan lengths than those typically acquired with CT in conventional RTP. This study investigates MRI acquisition with a moving table compared with static scans for potential geometric benefits for RTP. Methods: A full field of view (FOV) phantom (diameter 500 mm; length 513 mm) was developed for measuring geometric distortions in MR images over volumes pertinent to RTP. The phantom consisted of layers of refined plastic within which vitamin E capsules were inserted. The phantom was scanned on CT to provide the geometric gold standard and on MRI, with differences in capsule location determining the distortion. MRI images were acquired with two techniques. For the first method, standard static table acquisitions were considered. Both 2D and 3D acquisition techniques were investigated. With the second technique, images were acquired with a moving table. The same sequence was acquired with a static table and then with table speeds of 1.1 mm/s and 2 mm/s. All of the MR images acquired were registered to the CT dataset using a deformable B-spline registration with the resulting deformation fields providing the distortion information for each acquisition. Results: MR images acquired with the moving table enabled imaging of the whole phantom length while images acquired with a static table were only able to image 50%–70% of the phantom length of 513 mm. Maximum distortion values were reduced across a larger volume when imaging with a moving table. Increased table speed resulted in a larger contribution of distortion from gradient nonlinearities in the through

  6. The TerraSAR-X/TanDEM-X Formation Acquisition-from Planning to Realization

    NASA Astrophysics Data System (ADS)

    Kahle, Ralph; Schlepp, Benjamin; Meissner, Florian; Kirschner, Michael; Kiehling, Reinhard

    2012-09-01

    On June 21, 2010 the TanDEM-X satellite (TDX) was injected into orbit at 15,700 km distance from its twin satellite TerraSAR-X (TSX), which has been in orbit since 2007. Already one month later TDX acquired a formation with TSX in order to build up the first single-pass radar interferometer in space. Within three years of close formation flying with flexible baselines ranging from 150 m to a few kilometers the twin satellites will collect interferometric radar measurements for the generation of a global digital elevation model with unprecedented accuracy. This paper elaborates on the TDX pre-launch analysis performed in the fields of collision assessment during orbit injection and target formation acquisition. To avoid a critical close approach shortly after TDX separation, the risk of collision between the already flying TSX satellite and the newly injected elements (DNEPR upper-stage, gas dynamic shield, and TDX satellite) had to be carefully analyzed. Further, the paper discusses a fuel-saving formation acquisition strategy, for which the maneuver budget is analyzed as a function of launch day and launch injection accuracy. Finally, flight results are presented to illustrate the successful formation acquisition realized in July 2010 and the formation reconfiguration process from the 20 km wide formation into the 300-400 m close formation performed in October 2010. This reconfiguration marked the start of the bi-static TDX/TSX instrument operation.

  7. Africana Acquisitions; Report of a Publication Survey Trip to Nigeria, Southern Africa, and Europe, 1972.

    ERIC Educational Resources Information Center

    Witherell, Julian W.

    A publication survey trip to Nigeria, Southern Africa, and Europe was taken by Julian W. Witherell of the African Section of the Library of Congress in 1972. The purpose of the trip was to improve the flow of publications about Africa to the Library of Congress. The trip was successful in that personal contacts helpful in obtaining local materials…

  8. Crisis Communication Plans: Poor Predictors of Excellent Crisis Public Relations.

    ERIC Educational Resources Information Center

    Marra, Francis J.

    1998-01-01

    Argues that newly developed theory in crisis public relations suggests a shift is necessary in the way practitioners view crises. Notes that the new paradigm defines excellent crisis public relations very differently from the literature of the past 20 years. (RS)

  9. 32 CFR Appendix D to Part 651 - Public Participation Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... incorporate public involvement processes whenever appropriate (40 CFR 1506.6). (5) Consultation of persons and... involvement is a requisite element of the scoping process (40 CFR 1501.7(a)(1)). (6) Preparation of EAs will incorporate public involvement processes whenever appropriate (40 CFR 1506.6). (7) Persons and agencies to...

  10. Publication planning: promoting an ethics of transparency and integrity in biomedical research.

    PubMed

    DeTora, L; Foster, C; Skobe, C; Yarker, Y E; Crawley, F P

    2015-09-01

    Biomedical research should include plans to communicate complete and accurate results to the scientific community and the public in a timely manner. All too often, however, such planning is lacking until after data have been generated. We developed a collaborative professional statement following review of the indexed biomedical literature and relevant professional society guidelines. Planning for publications before, during and after biomedical research studies are conducted promotes the timely dissemination of accurate and comprehensive results. Effective publication planning accounts for the work of all contributors, encourages full transparency and contributes to overall scientific integrity. Although the most obvious contribution of publication planning is to result dissemination, the best planning may also help improve the overall quality of research study design and the overall integrity of study conduct by keeping the final audience in the forefront of the investigators' attention. Publication planning can help biomedical researchers achieve and maintain high standards of transparency and integrity. Table 1 below highlights briefly some of the aspects to be included in a publication plan. PMID:26311328

  11. The role of public health officers in preparedness planning and management of health crises.

    PubMed

    Strauss, R; Muchl, R; Kunze, M; Hrabcik, H

    2008-03-13

    The contribution of public health officers is of crucial importance in both the preparedness planning process and the response to health threats since the implementation of public health measures lies within the competence of the public health system. Thus, public health officers on regional and district level have to be involved in every stage of the planning process for crisis management. Federal structures of health systems as equivalent to the political structure of a country pose specific challenges for both the planning process and the response itself. The most important instrument for the evaluation of crisis plans, including the assessment of the public health officers' preparedness, is the performance of exercises. The success of a simulation exercise depends mainly on careful planning process, clear evaluation criteria and a work plan, that allows for necessary improvements of crisis plans of all involved organisations. Simulation exercises are an integrated element of preparedness activities on all administrative levels of the public health system. Depending on the nature of the exercise public health officers on regional and district level are involved as planners or as players PMID:18768125

  12. 48 CFR 1505.203 - Publicizing and response time.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Publicizing and response time. 1505.203 Section 1505.203 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopses of Proposed Contract Actions 1505.203...

  13. 48 CFR 1505.203 - Publicizing and response time.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Publicizing and response time. 1505.203 Section 1505.203 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopses of Proposed Contract Actions 1505.203...

  14. 48 CFR 1505.203 - Publicizing and response time.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Publicizing and response time. 1505.203 Section 1505.203 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopses of Proposed Contract Actions 1505.203...

  15. 48 CFR 306.302-7 - Public interest.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Public interest. 306.302-7 Section 306.302-7 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 306.302-7 Public...

  16. 48 CFR 306.302-7 - Public interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Public interest. 306.302-7 Section 306.302-7 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 306.302-7 Public...

  17. 48 CFR 806.302-7 - Public interest.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Public interest. 806.302-7 Section 806.302-7 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 806.302-7 Public...

  18. 48 CFR 306.302-7 - Public interest.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Public interest. 306.302-7 Section 306.302-7 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 306.302-7 Public...

  19. 48 CFR 2806.302-7 - Public interest.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Public interest. 2806.302-7 Section 2806.302-7 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 2806.302-7 Public interest....

  20. 48 CFR 606.302-7 - Public interest.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Public interest. 606.302-7 Section 606.302-7 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 606.302-7 Public interest....

  1. 48 CFR 306.302-7 - Public interest.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Public interest. 306.302-7 Section 306.302-7 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 306.302-7 Public...

  2. 48 CFR 606.302-7 - Public interest.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Public interest. 606.302-7 Section 606.302-7 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 606.302-7 Public interest....

  3. 48 CFR 806.302-7 - Public interest.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Public interest. 806.302-7 Section 806.302-7 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 806.302-7 Public...

  4. 48 CFR 2806.302-7 - Public interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Public interest. 2806.302-7 Section 2806.302-7 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 2806.302-7 Public interest....

  5. 48 CFR 806.302-7 - Public interest.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Public interest. 806.302-7 Section 806.302-7 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 806.302-7 Public...

  6. 48 CFR 2806.302-7 - Public interest.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Public interest. 2806.302-7 Section 2806.302-7 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE Competition and Acquisition Planning COMPETITION REQUIREMENTS Other Than Full and Open Competition 2806.302-7 Public interest....

  7. 48 CFR 606.302-7 - Public interest.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Public interest. 606.302-7 Section 606.302-7 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 606.302-7 Public interest....

  8. 48 CFR 606.302-7 - Public interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Public interest. 606.302-7 Section 606.302-7 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 606.302-7 Public interest....

  9. IFLA General Conference, 1990. Division of Collections and Services: Section of Acquisition and Exchange; Section of Interlending and Document Delivery, Section of Serial Publications. Booklet 5.

    ERIC Educational Resources Information Center

    International Federation of Library Associations, The Hague (Netherlands).

    The 25 papers in this collection were presented at the meetings of three sections of the Division of Collections and Services and a workshop: (1) "Survey of International Exchange of Non-Official Publications: Progress Report" (Ulla Hojsgaard); (2) "Buying Media for Everyone: Public Library Acquisition in Scandinavia" (Tove Persson); (3) "The…

  10. 7 CFR Exhibit B to Subpart B of... - Grant Agreement (Public Bodies) for Site Development and/or Site Acquisition for Housing and/or...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Grant Agreement (Public Bodies) for Site Development and/or Site Acquisition for Housing and/or Public Facilities and/or Services B Exhibit B to Subpart B of Part 1948 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE,...

  11. 76 FR 47271 - Implementation of Scientific Integrity Principles: Draft Plan for Public Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... Implementation of Scientific Integrity Principles: Draft Plan for Public Comment AGENCY: National Science Foundation. ACTION: National Science Foundation (NSF) Implementation of Scientific Integrity Principles... Heads of Executive Departments and Agencies on Scientific Integrity. Shortly thereafter the Office...

  12. 77 FR 21795 - Notice of Submission of Proposed Information Collection to OMB Public Housing Agency Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... conversion, homeownership, or capital improvements, etc.) as part of an Annual PHA Plan submission. However... approval processes that exist for demolition or disposition, designated housing, conversion, homeownership..., must continue to submit any demolition or disposition, public housing conversion, homeownership,...

  13. MASTER PLAN FOR PUBLIC JUNIOR COLLEGES IN TEXAS.

    ERIC Educational Resources Information Center

    COLVERT, C.C.

    THIS MASTER PLAN ESTIMATES FUTURE JUNIOR COLLEGE POPULATIONS AND THE MINIMUM NECESSARY ENROLLMENT PER COLLEGE, PROPOSES THE ESTABLISHMENT OF ENOUGH JUNIOR COLLEGE DISTRICTS TO ACCOMMODATE THEM, AND SUGGESTS CERTAIN CURRICULUMS. BASED ON THE NUMBER OF HIGH SCHOOL GRADUATES IN 1963, PROJECTIONS WERE MADE FOR 1968 TO 1977, AND PROJECTIONS ON THESE…

  14. Planning Schools for the Future. Publication No. BM-1.

    ERIC Educational Resources Information Center

    Weinberger, JoAnn

    In a three-year study, Research for Better Schools (RBS) was asked by the National Institute of Education to identify, analyze, and verify definitive social changes forecast for the decades ahead, and to project their implications for schools of the future. RBS reviewed the literature to extract future planning needs relevant to educational…

  15. Metrics, Business Plans, and the Vanishing Public Good

    ERIC Educational Resources Information Center

    Tuchman, Gaye

    2011-01-01

    For at least 30 years, professional work has been changing. Even such once-elite professionals as doctors, lawyers, and professors have become subject to significant control. Single-practitioner medical practices have given way to group practices subject to the rules of insurance plans; lawyers join mammoth firms where paralegals time the steps…

  16. The Pandemic Subject: Canadian Pandemic Plans and Communicating with the Public about an Influenza Pandemic

    PubMed Central

    Maunula, Laena

    2013-01-01

    In this paper, I examine the goals for pandemic public communication as outlined in two Canadian plans for pandemic planning and infection control. I critique these strategies by drawing on Foucault's notions of governmentality and biopower. My argument is that the public health communication campaign goals reviewed rest upon a particular conceptualization of health in the context of pandemic planning as an individual/family duty, and that scientific/medical expert knowledge is most appropriate for guiding pandemic planning. This study contributes to a sociological understanding of how pandemic preparedness and infection control are represented in Canadian pandemic plans, how public health shapes pandemic communication messages in Canada, and the implications of those messages for subjectivity and notions of citizenship. PMID:24289936

  17. The pandemic subject: Canadian pandemic plans and communicating with the public about an influenza pandemic.

    PubMed

    Maunula, Laena

    2013-10-01

    In this paper, I examine the goals for pandemic public communication as outlined in two Canadian plans for pandemic planning and infection control. I critique these strategies by drawing on Foucault's notions of governmentality and biopower. My argument is that the public health communication campaign goals reviewed rest upon a particular conceptualization of health in the context of pandemic planning as an individual/family duty, and that scientific/medical expert knowledge is most appropriate for guiding pandemic planning. This study contributes to a sociological understanding of how pandemic preparedness and infection control are represented in Canadian pandemic plans, how public health shapes pandemic communication messages in Canada, and the implications of those messages for subjectivity and notions of citizenship. PMID:24289936

  18. Internationalization as Mergers and Acquisitions: Senior International Officers' Entrepreneurial Strategies and Activities in Public Universities

    ERIC Educational Resources Information Center

    Deschamps, Eric; Lee, Jenny J.

    2015-01-01

    This study investigated the various emerging forms of internationalization and how senior international affairs officers describe their motivations and rationales for implementing these activities. Based on interviews with senior international officers at 30 international offices in U.S. public universities, this study identified and classified…

  19. Public evaluation of open space in Illinois: citizen support for natural area acquisition.

    PubMed

    Backlund, Erik A; Stewart, William P; McDonald, Cary; Miller, Craig

    2004-11-01

    Numerous studies have indicated a broad-based support for open space preservation and protection. Research also has characterized the public values and rationale that underlie the widespread support for open space. In recognition of the widespread public support for open space, various levels of government have implemented programs to provide public access to open space. There are many different types of open space, ranging from golf courses, ball parks, wildlife areas, and prairies, to name a few. This paper addresses questions related to the types of open space that should be prioritized by planners and natural resource managers. The results of this study are based on a stratified random sample of 5000 households in Illinois that were sent a questionnaire related to their support for various types of open space. Through a comparatively simple action grid analysis, the open space types that should be prioritized for public access include forest areas, stream corridors, wildlife habitat, and lakes/ponds. These were the open space types rated of the highest importance, yet were also the open space types rated the lowest in respondent satisfaction. This kind of analysis does not require the technical expertise of other options for land-use prioritizations (e.g., conjoint analysis, contingent valuation), yet provides important policy directives for planners. Although open space funds often allow for purchase of developed sites such as golf courses, ball parks, and community parks, this study indicates that undeveloped (or nature-based) open space lands are most needed in Illinois. PMID:15633031

  20. Government Acquisition of Private Property for Public Use: An Analysis of United States Supreme Court Decisions

    ERIC Educational Resources Information Center

    Ravenell, William H.; Davis, Bobby

    2006-01-01

    Several decisions of the United States Supreme Court on eminent domain and the impact of these decisions were explore. These decisions involved the Fifth Amendment, which provides the legal standard for eminent domain. We reviewed the history of the Court regarding what is "public use" within the Fifth Amendment. Moreover, what the Court…

  1. 76 FR 9679 - Defense Federal Acquisition Regulations Supplement; Publication of Notification of Bundling of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... rule at 75 FR 40714 on July 13, 2010, to implement section 820 of the Fiscal Year 2010 National Defense... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF DEFENSE... Regulations Supplement; Publication of Notification of Bundling of Contracts of the Department of...

  2. School Facility Logistics. A Study for Alberta Education Dealing with School Planning, Acquisition, and Funding Alternatives.

    ERIC Educational Resources Information Center

    Woods, Gordon and Co., Toronto (Ontario).

    Alternatives to current provincial policies and procedures relating to school construction and its funding are identified and examined. The report sets out findings and recommendations in four sections. In the first section, School Facility Planning, Policies, and Procedures, school building is proposed as an integral part of shared community…

  3. Doing Planning and Task Performance in Second Language Acquisition: An Ethnomethodological Respecification

    ERIC Educational Resources Information Center

    Markee, Numa; Kunitz, Silvia

    2013-01-01

    We use insights and methods from ethnomethodological conversation analysis and discursive psychology to develop an account of embodied word and grammar searches as socially distributed planning practices. These practices, which were produced by three intermediate learners of Italian as a Foreign Language (IFL), occurred massively in natural data…

  4. 77 FR 74662 - Federal Acquisition Regulation; Submission for OMB Review; Accident Prevention Plans and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-17

    ... and Recordkeeping. A notice was published in the Federal Register at 77 FR 56645 on September 13, 2012... Burden The estimated reporting burden has been adjusted since published in the Federal Register at 74 FR... NE., Washington, DC 20417. ATTN: Hada Flowers/IC 9000-0060, Accident Prevention Plans...

  5. Study of solid rocket motors for a space shuttle booster. Volume 3: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    Vonderesch, A. H.

    1972-01-01

    Plans for conducting Phase C/D for a solid rocket motor booster vehicle are presented. Methods for conducting this program with details of scheduling, testing, and program management and control are included. The requirements of the space shuttle program to deliver a minimum cost/maximum reliability booster vehicle are examined.

  6. 75 FR 47859 - Availability of SBA Draft Strategic Plan for Fiscal Years 2011-2016 and Request for Public Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... From the Federal Register Online via the Government Publishing Office SMALL BUSINESS ADMINISTRATION Availability of SBA Draft Strategic Plan for Fiscal Years 2011- 2016 and Request for Public... plan for the FY 2011 to FY 2016 planning period, go to...

  7. Not-so-strange bedfellows: models of interaction between managed care plans and public health agencies.

    PubMed

    Halverson, P K; Mays, G P; Kaluzny, A D; Richards, T B

    1997-01-01

    Alliances between managed care plans and public health agencies are a growing phenomenon in local health care markets, with profound implications for health care quality, cost, and accessibility. A typology of interorganizational relations between managed care plans and local public health agencies is drawn from observations of over 60 public health jurisdictions. Relations are described along three dimensions corresponding to the strategic intent, functional operation, and structural design of each alliance type. The identified models of interaction reveal the motivations for forming alliances, the mechanics of their operation, and the possible outcomes. These alliances suggest that a wide range of interorganizational strategies is possible in order to pursue the shared interests of local public health agencies and managed care plans. Nonetheless, public health agencies may face challenges in forging managed care alliances that benefit community-wide populations and that are open to participation by the full spectrum of health care providers in the community. PMID:9063302

  8. Saving Alma Mater: A Rescue Plan for America's Public Universities

    ERIC Educational Resources Information Center

    Garland, James C.

    2009-01-01

    America's public universities educate 80% of our nation's college students. But in the wake of rising demands on state treasuries, changing demographics, growing income inequality, and legislative indifference, many of these institutions have fallen into decline. Tuition costs have skyrocketed, class sizes have gone up, the number of courses…

  9. Could a Cash Balance Plan Benefit Illinois Public School Teachers?

    ERIC Educational Resources Information Center

    Johnson, Richard W.; Southgate, Benjamin G.

    2015-01-01

    The Teachers' Retirement System of the State of Illinois is one of the worst-funded public pensions in the nation. In 2013, it held enough assets to cover only 41 percent of its future obligations (Buck Consultants, 2014). This shortfall has led to several reforms, mostly involving benefit cuts that have undermined retirement income security for…

  10. Governance of Academic Planning in Public Higher Education Systems

    ERIC Educational Resources Information Center

    Harmening, Todd R.

    2013-01-01

    The recent interest in harnessing the collective capacity of public institutions of higher education is challenging long-held beliefs about system coordination. Constricted state resources, globalization, market forces, and new technologies suggest that new governance structures are not only a necessity but an opportunity to better connect system…

  11. Public comments and responses to the 1993 Hanford cleanup five-year plan

    SciTech Connect

    Not Available

    1993-08-01

    In March 1993, the US Department of Energy, Richland Operations Office (DOE-RL) published its annual Site-Specific Five-Year Plan. The Site-Specific Plan is published to inform the public about the background, status, and plans for Environmental Restoration (ER) and Waste Management (WM) activities at the Hanford site. It is the only document that seeks to bring all ER and WM elements together in one document. The Site-Specific Plan is a companion document to the National Five-Year Plan that deals with all the sites within the DOE complex on a summary level. This Response to Comments document does not try to address every question or concern raised during the public comment period. Some questions were outside the scope of the Five-Year Plan, some we could not decipher, others were variations of the same question. The initial round of public meetings was held in Portland, Oregon, and Seattle, Pasco, and Olympia, Washington. At the request of the Oregon Department of Energy (ODOE) and the Washington State Department of Ecology (Ecology), a second round of meetings was held in Portland and Olympia. Both agencies felt that the first two meetings were held with too little advance notice, and before the Plan could be distributed. Once the public meetings were over and the comment period closed, we then compiled the public comments, largely from audio tapes of the meetings. Individual functions within Hanford were asked to consider and respond to the comments.

  12. A PLAN FOR EDUCATIONAL POLICY AND ADMINISTRATIVE UNITS, FURTHER DECENTRALIZATION OF THE PUBLIC SCHOOLS.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY.

    THIS PLAN CONTAINS LEGISLATIVE PROPOSALS AND GENERAL RECOMMENDATIONS FOR THE DECENTRALIZATION OF THE NEW YORK CITY PUBLIC SCHOOLS AND FOR INCREASED PARENT AND COMMUNITY PARTICIPATION. IN PART IT RESPONDS TO AN EARLIER PLAN PROPOSED BY THE MAYOR'S PANEL ON DECENTRALIZATION. THE PRESENT PROPOSAL SUGGESTS THAT THE ADMINISTRATIVE RESTRUCTURING OF THE…

  13. 76 FR 55344 - Pacific Coast Groundfish; Public Hearing Notice; Secretarial Fishery Management Plan Amendment 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... (76 FR 53414). Written and oral comments received at the public hearing will be taken into... establish one new rebuilding plan, modify seven existing plans, modify the default proxy values for F MSY... auxiliary aids should be directed to Ms. Carolyn Porter at (503) 820-2280 (voice), or (503) 820-2299...

  14. Looking Back at the Future: Public School Surveys and Educational Planning.

    ERIC Educational Resources Information Center

    Ignasias, C. Dennis; And Others

    1982-01-01

    The integration of planning and assessment procedures into educational administrative routines is viewed in relation to school surveys, a criteria-based means for measuring the operational efficiency of a school system. The school survey movement in the United States, characteristics of public school surveys, and the educational planning process…

  15. 24 CFR 971.7 - Plan for removal of units from public housing inventories.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... in 24 CFR 970.5. (8) A record indicating compliance with the statute's requirements for consultation... plan for removal of the affected public housing units from the inventory. The plan should consider... the inventory; (2) The number of households to be relocated, by bedroom size; (3) Identification...

  16. 76 FR 60934 - U.S. Global Change Research Program Strategic Plan Public Comment Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... From the Federal Register Online via the Government Publishing Office NATIONAL SCIENCE FOUNDATION U.S. Global Change Research Program Strategic Plan Public Comment Period AGENCY: National Science.... Global Change Research Program Strategic Plan: ] Goal 1: Advance Science: Advance scientific knowledge...

  17. Excess Classroom Space--A Case for Better Planning. District of Columbia Public Schools.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC.

    This report identifies problems in planning for school construction by the District of Columbia Public Schools (DCPS) and discusses how the Board of Education can better administer its building modernization and renovation program. The aim of the study was to find out if DCPS' capital improvement planning system was providing essential data to the…

  18. A Correlational Analysis of Strategic Information Systems Planning in K-12 Public Educational Organizations

    ERIC Educational Resources Information Center

    Martin, Christopher J.

    2012-01-01

    Three decades of research has indicated that strategic information systems planning is a vital component to business success. The purpose of this study was to identify the relationship strategic information systems planning and financial commitment has within the K-12 public education sector. Data for this study was obtained from top management of…

  19. The Planning Unit Concept: An Alternative Approach to Program-Budgeting in Public Service Agencies.

    ERIC Educational Resources Information Center

    Weiss, Edmond; And Others

    The Planning Unit is a concept employed in resource requirements forecasting for the public service agencies, as an alternative to the conventional hierarchical program-structure used in PPB systems. The planning unit concept allows analysts to generate cost analyses by several simultaneous program-structures, not all of which need be in a…

  20. Integrated Lesson/Project Plans by and for Columbus Public School Teachers.

    ERIC Educational Resources Information Center

    Bidwell, Sheri, Ed.

    This document contains 34 lesson or project plans written at inservice workshops focusing on integrating workplace skills (i.e. SCANS [Secretary's Commission on Achieving Necessary Skills] and career awareness into the K-12 curriculum in Columbus (Ohio) Public Schools. The lesson and project plans are loosely organized by grade level. Each lesson…

  1. Public Library Planning: Case Studies for Management. The Greenwood Library Management Collection.

    ERIC Educational Resources Information Center

    Sutton, Brett

    This book is the result of a set of case studies that were performed in four American public libraries between 1989 and 1992. The goal of the research was to describe the effect that planning has had in a representative set of libraries, focusing planning as a social phenomenon. The city, county, federated, and suburban library are examined.…

  2. The plan for the economic evaluation of the public service communication satellite system

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A plan for the economic evaluation of the Public Service Communications Satellite (PSCS) within domestic markets is presented. It extends through the planning, performance and evaluation of economic experiments following the launch of the PSCS in 1982, and includes the consideration of how the results of these experiments impact the transfer from demonstration to operations. The implementation of this plan will provide information needed to understand and manage the economic and social impacts of the PSCS program.

  3. The plan for the economic evaluation of the Public Service Communication Satellite system

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A total plan for the economic evaluation of the PSCS public service communication satellite program within domestic markets is presented. It extends from the present through the planning, performance and evaluation of economic experiments following the launch of the PSCS, and includes the consideration of how the results of these experiments impact the transfer from demonstration to operations. The implementation of this plan will provide NASA with information needed to understand and manage the economic and social impacts of the PSCS program.

  4. Office of the Assistant Secretary for Preparedness and Response; HHS Public Health Emergency Medical Countermeasures Enterprise implementation plan for chemical, biological, radiological and nuclear threats. Notice.

    PubMed

    2007-04-23

    The United States faces serious public health threats from the deliberate use of weapons of mass destruction (WMD)--chemical, biological, radiological, or nuclear (CBRN)--by hostile States or terrorists, and from naturally emerging infectious diseases that have a potential to cause illness on a scale that could adversely impact national security. Effective strategies to prevent, mitigate, and treat the consequences of CBRN threats is an integral component of our national security strategy. To that end, the United States must be able to rapidly develop, stockpile, and deploy effective medical countermeasures to protect the American people. The HHS Public Health Emergency Medical Countermeasures Enterprise (PHEMCE) has taken a holistic, end-to-end approach that considers multiple aspects of the medical countermeasures mission including research, development, acquisition, storage, maintenance, deployment, and guidance for utilization. Phase one of this approach established the HHS PHEMCE Strategy for Chemical, Biological, Radiological, and Nuclear Threats (HHS PHEMCE Strategy). The HHS PHEMCE Strategy, published in the Federal Register on March 20, 2007, described a framework of strategic policy goals and objectives for identifying medical countermeasure requirements and establishing priorities for medical countermeasure evaluation, development and acquisition. These strategic policy goals and objectives were used to establish the Four Pillars upon which this HHS Public Health Emergency Medical Countermeasures Enterprise Implementation Plan (HHS PHEMCE Implementation Plan) is based. The HHS PHEMCE Implementation Plan considers the full spectrum of medical countermeasures-related activities, including research, development, acquisition, storage/maintenance, deployment, and utilization. The HHS PHEMCE Implementation Plan is consistent with the President's Biodefense for the 21st Century and is aligned with the National Strategy for Medical Countermeasures against

  5. Focus on Children. A Comprehensive Reform Plan for the Boston Public Schools.

    ERIC Educational Resources Information Center

    Boston Public Schools, MA.

    The Boston (Massachusetts) Public Schools present a comprehensive plan designed to bring all students to an acceptable level of mastery to meet state requirements or their own new higher standards. For the first time in decades, all the elements of school reform are in place, with public and administrative support. The primary goal of the Boston…

  6. 76 FR 53450 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    ... Transmission Owning and Operating Public Utilities, Order No. 1000, 76 FR 49,842 (Aug. 11, 2011), 136 FERC ] 61... Energy Regulatory Commission Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities; Notice of Staff Informational Conferences Take notice that Commission staff...

  7. The Florida Public Broadcasting System. Report and Recommendations of the Postsecondary Education Planning Commission. Report 3.

    ERIC Educational Resources Information Center

    Florida State Postsecondary Education Commission, Tallahassee.

    This study of the Florida Public Broadcasting Program System, which was conducted by the Program Committee of the Postsecondary Education Planning Commission, focused on five basic issues: (1) What are the current policies and procedures for determining how to add public broadcasting stations to Florida's system? (2) How should Florida fund public…

  8. 2 CFR Appendix D to Part 225 - Public Assistance Cost Allocation Plans

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... provisions of Subpart E of 45 CFR part 95. D. Submission, Documentation, and Approval of Public Assistance... approval of public assistance cost allocation plans in Subpart E of 45 CFR part 95. All administrative... in Subpart E of 45 CFR part 95. For the purpose of this appendix, these programs include all...

  9. 2 CFR Appendix Vi to Part 200 - Public Assistance Cost Allocation Plans

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., submission, negotiation, and approval of public assistance cost allocation plans in Subpart E of 45 CFR Part... services and goods provided directly to program recipients. C. Policy State public assistance agencies will... assistance agencies are funded predominately by the Department of Health and Human Services (HHS). In...

  10. 3D model acquisition, design, planning, and manufacturing of orthopaedic devices: a framework

    NASA Astrophysics Data System (ADS)

    Kidder, Justin R.; Mason, Emily; Nnaji, Bartholomew O.

    1996-12-01

    Design and manufacture of orthopedic devices using rapid prototyping technologies has been until recently a highly iterative process that involves multiple users, including doctors, design engineers and rapid prototyping experts. Existing systems for creation of orthopedic parts through rapid prototyping do not follow the principles of concurrent engineering and design for manufacture. This leads to excessive communication between parties and delays in product realization time. In this paper, we lay out the framework for a unified expert system that will enable a doctor to create quickly and easily fully functional prosthetics and orthopedic implants. Necessary components of the model acquisition process should include volumetric segmentation of objects from a CT or MRI dataset and NURBS surface fitting to the boundary points. Finite element analysis and surface model modification modules are also needed, but should be provided in an intuitive fashion for doctors who are not experienced in computer aided design. Preprocessing for rapid prototype building should be automatic, and should include optimal orientation, support structure generation and build simulation modules. Finally, the model should be passed to the rapid prototyping machine in a presliced format for speed and accuracy.

  11. 75 FR 29570 - Notice of Proposed Information Collection for Public Comment Public Housing Agency Plan Revisions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... URBAN DEVELOPMENT Notice of Proposed Information Collection for Public Comment Public Housing Agency... Officer, QDAM, Department of Housing and Urban Development, 451 7th Street, SW., Room 4178, Washington, DC... Urban Development, 451 7th Street, SW., Room 4116, Washington, DC 20410; telephone 202-402-3374,...

  12. Tracking and data acquisition system for the 1990's. Volume 8: TDAS frequency planning

    NASA Technical Reports Server (NTRS)

    Heppe, S. B.; Elrod, B. D.

    1983-01-01

    Current planning calls for the TDAS to support new user and crosslink services, in addition to TDRSS-compatible services. TDRSS-compatible services would operate in current S-band and K-band channels used by TDRSS. New services, however, can take advantage of technology advances at microwave and optical frequencies. For augmented space-to-space services, 60 GHz and GaAs laser systems offer technical advantages, relative freedom from RFI, and a benign regulatory environment (i.e., minimal congestion and, in the case of 60 GHz, maximum regulatory support for TDAS-type services). For TDAS Earth-to-space and space-to-Earth services, the 30/20 GHz band offers the best mix of technical and regulatory advantages. But use of these bands would have to be coordinated with the U.S. military.

  13. Towards a Swedish health policy for the 1990s: planned markets and public firms.

    PubMed

    von Otter, C; Saltman, R B

    1991-01-01

    The Swedish health system has entered a period of major structural transformation. Most county councils have begun to experiment with new service delivery mechanisms, and the governing Social Democratic Party has proposed wide-ranging reforms intended to improve the efficiency, quality, and responsiveness of all public human services. This paper draws upon key elements in the current Swedish debate to develop an alternative policy model for publicly operated health systems in general. We argue that the limitations of existing planning and market based policy models can be overcome by an approach constructed upon 'planned markets'. This alternative model involves restructuring publicly operated systems into an intentionally designed network of 'public firms' that engage in a socially as well as economically efficient process of 'public competition'. The model harnesses patient choice of provider as the driving mechanism to enhance both production efficiency and democratic participation within the Swedish health system. PMID:2024163

  14. Acquisition strategies

    SciTech Connect

    Zimmer, M.J.; Lynch, P.W. )

    1993-11-01

    Acquiring projects takes careful planning, research and consideration. Picking the right opportunities and avoiding the pitfalls will lead to a more valuable portfolio. This article describes the steps to take in evaluating an acquisition and what items need to be considered in an evaluation.

  15. Augmentative and Alternative Communication for Children with Autism Spectrum Disorder: An Evidence-Based Evaluation of the Language Acquisition through Motor Planning (LAMP) Programme

    ERIC Educational Resources Information Center

    Bedwani, Mary-Ann Naguib; Bruck, Susan; Costley, Debra

    2015-01-01

    Children diagnosed with autism spectrum disorder often have restricted verbal communication. For children who do not use functional speech, augmentative and alternative communication (AAC) devices can be an important support. We evaluated the effectiveness of one AAC programme, the Language Acquisition through Motor Planning (LAMP) using a Vantage…

  16. Incorporating public preferences in planning urban water supply reliability

    NASA Astrophysics Data System (ADS)

    Howe, Charles W.; Smith, Mark Griffin

    1993-10-01

    This study has two objectives: (1) to compare the attitudes of the water-using public, water officials, and elected officials toward the risk of water supply shortage; and (2) to develop a methodology for incorporating water users' valuation of reliability in system design. Using contingent valuation techniques, we have measured the benefits and costs of different reliability levels in terms of water users' willingness to pay (WTP) for increases in reliability and in terms of their willingness to accept (WTA) compensation in the form of lower water bills for lower levels of reliability. Three cities in northern Colorado with diverse baseline levels of water supply reliability (Aurora, Boulder, and Longmont) are the study sites. Contrary to our hypothesis that water managers are unjustifiably risk averse, we find that water managers' preferences are consistent with customer WTP (WTA) values associated with the risk of water shortages and the system costs associated with reliability. Water managers in Boulder (high reliability) were willing to consider reductions in the level of system reliability while water managers in Aurora and Longmont (low reliability) favored the status quo or increased reliability. While these attitudes were sometimes contrary to a majority of customers' expressed interests in change, they were shown to be justified by comparison of supply system costs (savings) with aggregate WTP for additional reliability (WTA for less reliability).

  17. Planning ahead in public health? A qualitative study of the time horizons used in public health decision-making

    PubMed Central

    Taylor-Robinson, David C; Milton, Beth; Lloyd-Williams, Ffion; O'Flaherty, Martin; Capewell, Simon

    2008-01-01

    Background In order to better understand factors that influence decisions for public health, we undertook a qualitative study to explore issues relating to the time horizons used in decision-making. Methods Qualitative study using semi-structured interviews. 33 individuals involved in the decision making process around coronary heart disease were purposively sampled from the UK National Health Service (national, regional and local levels), academia and voluntary organizations. Analysis was based on the framework method using N-VIVO software. Interviews were transcribed, coded and emergent themes identified. Results Many participants suggested that the timescales for public health decision-making are too short. Commissioners and some practitioners working at the national level particularly felt constrained in terms of planning for the long-term. Furthermore respondents felt that longer term planning was needed to address the wider determinants of health and to achieve societal level changes. Three prominent 'systems' issues were identified as important drivers of short term thinking: the need to demonstrate impact within the 4 year political cycle; the requirement to 'balance the books' within the annual commissioning cycle and the disruption caused by frequent re-organisations within the health service. In addition respondents suggested that the tools and evidence base for longer term planning were not well established. Conclusion Many public health decision and policy makers feel that the timescales for decision-making are too short. Substantial systemic barriers to longer-term planning exist. Policy makers need to look beyond short-term targets and budget cycles to secure investment for long-term improvement in public health. PMID:19094194

  18. Pacific Northwest Electric Power Planning and Conservation Act, with Index (Public Law 96-501).

    SciTech Connect

    Not Available

    1991-12-01

    The Pacific Northwest Electric Power Planning and Conservation Act was enacted by the Senate and House of Representatives of the United States of America. It was enacted to assist the electrical consumers of the Pacific Northwest through use of the Federal columbia River Power System to achieve cost-effective energy conservation, to encourage the development of renewable energy resources, to establish a representative regional power planning process, to assure the region of an efficient and adequate power supply, and for other purposes. Contents of the Act are: short title and table of contents; purposes; definitions; regional planning and participation; sale of power; conservation and resource acquisition; rates; amendments to existing law; administrative provisions; savings provisions; effective date; and severability.

  19. IFLA General Conference, 1992. Division of Collections and Services: Section on Acquisition and Exchange; Section on Serial Publications; Section on Interlending and Document Delivery. Papers.

    ERIC Educational Resources Information Center

    International Federation of Library Associations and Institutions, London (England).

    Eight papers for the Collections and Services Division of the International Federation of Library Associations and Institutions that were given at the 1992 annual meeting are presented. These papers deal with the acquisition and exchange of library materials, interlending, and serial publications. The following papers are included: (1) "Why Won't…

  20. RESEARCH: Theory in Practice: Applying Participatory Democracy Theory to Public Land Planning

    PubMed

    Moote; Mcclaran; Chickering

    1997-11-01

    / Application of participatory democracy theory to public participation in public land planning, while widely advocated, has not been closely examined. A case study is used here to explicate the application of participatory democracy concepts to public participation in public land planning and decision making. In this case, a Bureau of Land Management resource area manager decided to make a significant shift from the traditional public involvement process to a more participatory method-coordinated resource management (CRM). This case was assessed using document analysis, direct observation of CRM meetings, questionnaires, and interviews of key participants. These sources were used to examine the CRM case using participatory democracy concepts of efficacy, access and representation, continuous participation throughout planning, information exchange and learning, and decision-making authority. The case study suggests that social deliberation in itself does not ensure successful collaboration and that establishing rules of operation and decision making within the group is critical. Furthermore, conflicts between the concept of shared decision-making authority and the public land management agencies' accountability to Congress, the President, and the courts need further consideration.KEY WORDS: Case study; Coordinated resource management; Public participation; Administrative discretion; Representation; Consensus; Collaboration PMID:9336486

  1. Planning for Serious Illness by the General Public: A Population-Based Survey

    PubMed Central

    Quinlan, Elizabeth; Venne, Rosemary; Hunter, Paulette; Surtees, Doug

    2013-01-01

    Background. While rates of advance care documentation amongst the general public remain low, there is increasing recognition of the value of informal planning to address patient preferences in serious illness. Objectives. To determine the associations between personal attributes and formal and informal planning for serious illness across age groups. Methods. This population-based, online survey was conducted in Saskatchewan, Canada, in April, 2012, using a nonclinical sample of 827 adults ranging from 18 to 88 years of age and representative of age, sex, and regional distribution of the province. Associations between key predictor variables and planning for serious illness were assessed using binary logistic regression. Results. While 16.6% of respondents had completed a written living will or advance care plan, half reported having conversations about their treatment wishes or states of health in which they would find it unacceptable to live. Lawyers were the most frequently cited source of assistance for those who had prepared advance care plans. Personal experiences with funeral planning significantly increased the likelihood of activities designed to plan for serious illness. Conclusions. Strategies designed to increase the rate of planning for future serious illness amongst the general public must account for personal readiness. PMID:25025030

  2. Facilities Planning Guide for Special Education Programs: Planning Accessibility for the Handicapped in Public Schools.

    ERIC Educational Resources Information Center

    Brooks, Kenneth W.

    The guide details characteristics to provide architecturally accessible special education programs for handicapped students. Impetus for the accessibility movement is traced to legislation, including the Architectural Barriers Act and Sections 503 and 504 of the Rehabilitation Act of 1973. Planning features considered are the development of a…

  3. 76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ..., Prevention and Control, Research, and Product Development. The Action Plan contains specific action items... Healthcare Research and Quality (AHRQ), the Centers for Medicare and Medicaid Services (CMS), the Health.... Tanja Popovic, Deputy Associate Director for Science, Centers for Disease Control and...

  4. Identifying and Meeting Training Needs for Public Participation Responsibilities in Water Resources Planning. Publication No. 107.

    ERIC Educational Resources Information Center

    Ertel, Madge O.

    This project surveyed planners in coastal zone management and 208 programs in New England to determine what type of skills and/or experience were required for planners to implement successful public participation programs. The research indicated that prior experience is more directly related to perceived adequacy than either academic or…

  5. Santa Fe Public Schools Facilities Master Plan. Elementary School Planning Standards.

    ERIC Educational Resources Information Center

    Santa Fe Public Schools, NM.

    This document contains policies and standards to guide the design and evaluation of elementary schools in the Santa Fe Public School District. These policies and standards can be used for a variety of purposes: to serve as a checklist to evaluate existing schools, to identify capital outlay needs to bring all schools to minimum standards, and to…

  6. 48 CFR 307.104-70 - Acquisition strategy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Acquisition strategy. 307.104-70 Section 307.104-70 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Planning 307.104-70 Acquisition strategy. Program and Project Managers responsible...

  7. 48 CFR 307.104-70 - Acquisition strategy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Acquisition strategy. 307... AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Planning 307.104-70 Acquisition strategy... designated by the HHS CIO, DASFMP, the CAO, or the cognizant HCA) shall prepare an acquisition strategy...

  8. 48 CFR 307.104-70 - Acquisition strategy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Acquisition strategy. 307... AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Planning 307.104-70 Acquisition strategy... designated by the HHS CIO, DASFMP, the CAO, or the cognizant HCA) shall prepare an acquisition strategy...

  9. 48 CFR 307.104-70 - Acquisition strategy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Acquisition strategy. 307... AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Planning 307.104-70 Acquisition strategy... designated by the HHS CIO, DASFMP, the CAO, or the cognizant HCA) shall prepare an acquisition strategy...

  10. 48 CFR 307.104-70 - Acquisition strategy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Acquisition strategy. 307... AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Planning 307.104-70 Acquisition strategy... designated by the HHS CIO, DASFMP, the CAO, or the cognizant HCA) shall prepare an acquisition strategy...

  11. Plan for increasing public participation in cleanup decisions for the Los Alamos National Laboratory

    SciTech Connect

    Not Available

    1995-01-01

    This document describes a plan for involving the public in decisions related to cleaning up sites suspected of being contaminated with chemicals or radioactivity at Los Alamos National Laboratory. In this section we describe the purpose of the Environmental Remediation Project, our past efforts to communicate with the northern New Mexico community, and the events that brought about our realization that less traditional, more innovative approaches to public involvement are needed.

  12. DO FAMILY PLANNING PROGRAMS DECREASE POVERTY? EVIDENCE FROM PUBLIC CENSUS DATA.

    PubMed

    Bailey, Martha J; Malkova, Olga; Norling, Johannes

    2014-01-01

    This paper provides new evidence that family planning programs are associated with a decrease in the share of children and adults living in poverty. Our research design exploits the county roll-out of U.S. family planning programs in the late 1960s and early 1970s and examines their relationship with poverty rates in the short and longer-term in public census data. We find that cohorts born after federal family planning programs began were less likely to live in poverty in childhood and that these same cohorts were less likely to live in poverty as adults. PMID:25346655

  13. DO FAMILY PLANNING PROGRAMS DECREASE POVERTY? EVIDENCE FROM PUBLIC CENSUS DATA

    PubMed Central

    Bailey, Martha J.; Malkova, Olga; Norling, Johannes

    2014-01-01

    This paper provides new evidence that family planning programs are associated with a decrease in the share of children and adults living in poverty. Our research design exploits the county roll-out of U.S. family planning programs in the late 1960s and early 1970s and examines their relationship with poverty rates in the short and longer-term in public census data. We find that cohorts born after federal family planning programs began were less likely to live in poverty in childhood and that these same cohorts were less likely to live in poverty as adults. PMID:25346655

  14. Test plan for the data acquisition and management system for monitoring the fuel oil spill at the Sandia National Laboratories installation in Livermore, California

    SciTech Connect

    Widing, M.A.; Dominiak, D.M.; Leser, C.C.; Peerenboom, J.P.; Manning, J.F.

    1995-04-01

    This report describes the formal test plan that will be used for the data acquisition and management system developed to monitor a bioremediation study by Argonne National Laboratory in association with Sandia National Laboratories. The data acquisition and management system will record the site data during the bioremediation and assist experts in site analysis. The three major subsystems of this system are described in detail in this report. In addition, this report documents the component- and system-level test procedures that will be implemented at each phase of the project. Results of these test procedures are documented in this report.

  15. Utah State Public Education Strategic Plan, 1992-1997: A Strategic Guide for the Future Development of the Public School System. Committee Report.

    ERIC Educational Resources Information Center

    Utah State Office of the Legislative Fiscal Analyst, Salt Lake City.

    The report of the Education Strategic Planning Committee concerning Utah's Public Education Strategic Plan for 1992-97 is presented in this document. The 2-year process involved over 200 participants from business, industry, government, education, and parents and students. The introduction describes in detail the planning process. Following…

  16. For-profit conversion of Blue Cross plans: public benefit or public harm?

    PubMed

    Hall, Mark A; Conover, Christopher J

    2006-01-01

    Conversions of Blue Cross plans to for-profit status have the potential to remake the corporate landscape of health care finance. Absent regulatory intervention, current trends could easily result in more than half of Blue Cross subscribers being in for-profit plans, a phenomenon far more significant than the conversion of nonprofit hospitals. Therefore, regulators' deliberations over conversion proposals are beginning to focus on the health policy impacts. This chapter surveys the full range of health policy implications by analyzing all existing studies of Blue Cross conversions and reporting on the authors' own case studies of conversion impacts. These studies conclude that conversions have not caused major negative impacts on the availability or accessibility of health care in the states in which conversions have occurred so far. However, a great deal of uncertainty exists about the actual effects of previous conversions, and each state is unique; therefore, even if the historical record were clear, it is difficult to predict with great certainty what the actual effects will be in another state undergoing a Blue conversion. PMID:16533125

  17. Public Library Services for Immigrants in Sweden.

    ERIC Educational Resources Information Center

    Marti, Hanna S.; Schulte-Albert, Hans G.

    1982-01-01

    Several new ideas regarding public library services for helping immigrants adjust to life in Sweden are discussed with respect to standards, selection, and acquisition of materials, children's services, and future plans. A bibliography of 19 references is included. (CHC)

  18. [Health in all policies and intersectoriality in health promotion: the Public Health Interdepartmental Plan of Catalonia].

    PubMed

    Mateu i Serra, Antoni

    2015-11-01

    In February 2014, the autonomous government in Catalonia, the Generalitat de Catalunya, approved the Catalan Public Health System Interdepartmental Plan (PINSAP, as per the Catalan acronym), responsible for the strategy in Catalonia for Health in All Policies, as recommended by the WHO and other international institutions. The PINSAP, as outlined under the Catalan Public Health Law, is binding for the government. The Plan was drawn up by the Interdepartmental Health Commission (CIS, as per the Catalan acronym) and is a collaboration between all Departments of the Generalitat. The Plan also receives contributions from 42 local, social and scientific bodies. Apart from the specific initiatives performed by each department which have a greater impact on health, the Plan proposes 30 initiatives, which are defined by their collaboration between public sectors, targeting determining health factors and paying special attention to combating inequalities and measuring the impact on health. The PINSAP encourages interdepartmental initiatives and collaboration between public sectors regarding determinants of health. Although it is only in its first year of implementation, many of their initiatives are already up and running and involving many healthcare professionals in Catalonia. PMID:26711060

  19. Organizing and Planning. Developing Publication Materials. Student Manual and Instructor's Manual.

    ERIC Educational Resources Information Center

    Chapman, Pat

    Supporting performance objective 3 of the V-TECS (Vocational-Technical Education Consortium of States) Secretarial Catalog, both a set of student materials and an instructor's manual on developing publication materials are included in this packet. (The packet is the second in a set of three on organizing and planning--CE 016 987-989.) The student…

  20. 75 FR 10228 - Publication of State Plan Pursuant to the Help America Vote Act; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... COMMISSION Publication of State Plan Pursuant to the Help America Vote Act; Correction AGENCY: U.S. Election...-3100. Correction In the Federal Register of February 10, 2010, in the FR Doc. 2010- 2919, on page 6643... published a document in the Federal Register on February 10, 2010, concerning Puerto Rico's amended...

  1. 75 FR 16764 - Publication of State Plan Pursuant to the Help America Vote Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... COMMISSION Publication of State Plan Pursuant to the Help America Vote Act AGENCY: U.S. Election Assistance Commission (EAC). ACTION: Notice. SUMMARY: Pursuant to sections 254(a)(11)(A) and 255(b) of the Help America.... Virgin Islands. 69 FR 14002. HAVA anticipated that States, Territories and the District of Columbia...

  2. 75 FR 41454 - Publication of State Plan Pursuant to the Help America Vote Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ... COMMISSION Publication of State Plan Pursuant to the Help America Vote Act AGENCY: U.S. Election Assistance Commission (EAC). ACTION: Notice. SUMMARY: Pursuant to Sections 254(a)(11)(A) and 255(b) of the Help America.... Virgin Islands. 69 FR 14002. HAVA anticipated that states, territories and the District of Columbia...

  3. 77 FR 23237 - Publication of State Plan Pursuant to the Help America Vote Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... COMMISSION Publication of State Plan Pursuant to the Help America Vote Act AGENCY: U.S. Election Assistance Commission (EAC). ACTION: Notice. SUMMARY: Pursuant to Sections 254(a)(11)(A) and 255(b) of the Help America... Columbia and the territories of American Samoa, Guam, Puerto Rico, and the U.S. Virgin Islands. 69 FR...

  4. 75 FR 39671 - Publication of State Plan Pursuant to the Help America Vote Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ... COMMISSION Publication of State Plan Pursuant to the Help America Vote Act AGENCY: U.S. Election Assistance Commission (EAC). ACTION: Notice. SUMMARY: Pursuant to Sections 254(a)(11)(A) and 255(b) of the Help America.... Virgin Islands. 69 FR 14002. HAVA anticipated that states, territories and the District of Columbia...

  5. 75 FR 6643 - Publication of State Plan Pursuant to the Help America Vote Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... COMMISSION Publication of State Plan Pursuant to the Help America Vote Act AGENCY: U.S. Election Assistance Commission (EAC). ACTION: Notice. SUMMARY: Pursuant to sections 254(a)(11)(A) and 255(b) of the Help America... Rico, and the U.S. Virgin Islands. 69 FR 14002. HAVA anticipated that States, Territories and...

  6. 76 FR 13377 - Publication of State Plan Pursuant to the Help America Vote Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... COMMISSION Publication of State Plan Pursuant to the Help America Vote Act AGENCY: U.S. Election Assistance Commission (EAC). ACTION: Notice. SUMMARY: Pursuant to Sections 254(a)(11)(A) and 255(b) of the Help America.... Virgin Islands. 69 FR 14002. HAVA anticipated that states, territories and the District of Columbia...

  7. 78 FR 45598 - Industry Forums on the Next ITS Strategic Plan; Notice of Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Industry Forums on the Next ITS Strategic Plan; Notice of Public Meeting AGENCY: ITS Joint Program Office, Research and Innovative Technology Administration, U.S. Department of Transportation. ACTION: Notice. The U.S. Department of Transportation...

  8. 77 FR 66729 - National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ...EPA is taking direct final action to amend the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), to acknowledge advancements in technologies used to manage and convey information to the public. Specifically, this revision will add language to EPA regulations to broaden the technology, to include computer telecommunications or other electronic means, that the lead agency......

  9. Up for Public Review: A Master Plan for California's K-16 Schools. EdFact.

    ERIC Educational Resources Information Center

    EdSource, Inc., Palo Alto, CA.

    The master plan for California prekindergarten through university education is to create a coherent, coordinated policy to forge a connection between K-12 and higher education policies. A bipartisan group of 18 state senators examined current educational concerns. The report will be completed in March 2002 and be available for public review in May…

  10. 75 FR 51759 - Publication of State Plan Pursuant to the Help America Vote Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-23

    .... Virgin Islands. 69 FR 14002. HAVA anticipated that states, territories and the District of Columbia would... From the Federal Register Online via the Government Publishing Office ELECTION ASSISTANCE COMMISSION Publication of State Plan Pursuant to the Help America Vote Act AGENCY: U.S. Election...

  11. Retirement Planning and Counseling: Issues and Challenges for Teachers in Public Schools in the Sekondi Circuit

    ERIC Educational Resources Information Center

    Wilson, Kwesi Nkum; Aggrey, Ellen Aba Munkua

    2012-01-01

    The purpose of the study was to explore retirement planning, challenges, and counseling among teachers of public schools in the Sekondi Circuit in the Western Region, Ghana. A sample of 50 teachers was selected through convenience sampling. Only teachers who expressed interest in participating in the study were sampled. The main instrument for…

  12. District of Columbia Public Schools State Accountability Plan. Consolidated State Application Accountability Workbook. Revised

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    The State Accountability Plan submitted on May 1, 2003 and revised on June 3, 2003 details the proposed policies and procedures relating to the District of Columbia Public Schools State Education Agency (DCPS-SEA) Assessment and Accountability Policy. It includes the development, implementation and monitoring of a comprehensive accountability…

  13. Pursuit of Excellence: The Detroit Public Schools Action Plan 1994-95.

    ERIC Educational Resources Information Center

    Detroit Board of Education, MI.

    "Pursuit of Excellence" is a plan developed through the cooperation of many stakeholders to guide the improvement efforts of the Detroit (Michigan) public schools in 1994-95. The first goal, to guarantee student success, includes objectives for achievement and results on achievement tests and objectives for accreditation, attendance, and student…

  14. 78 FR 45996 - Connected Vehicle Planning and Policy Stakeholder Meeting; Notice of Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Connected Vehicle Planning and Policy Stakeholder Meeting; Notice of Public Meeting AGENCY: ITS Joint Program Office, Research and Innovative Technology Administration, U.S. Department of Transportation. ACTION: Notice. The U.S. Department...

  15. Planning a text-management system for technical publications at Oak Ridge National Laboratory

    SciTech Connect

    Williams, E.N.; McCulloch, R.D.

    1980-01-01

    The planning and evolution of the centralized text-management system (CTMS) being implemented by the Technical Publications Department of the Oak Ridge National Laboratory's Information Division is described. The CTMS is a shared-logic system that provides for easy composition of technical documentation, including multilevel mathematics and complex tables. 3 figures.

  16. Guam Public School System District Action Plan: Goals and Objectives, 2007

    ERIC Educational Resources Information Center

    Guam Public School System, 2007

    2007-01-01

    The Guam Education Policy Board initially adopted the Guam Public School System District Action Plan in May 2003. The DAP established the direction and details for improving academic performance in reading, math, and language arts by using the provisions of the No Child Left Behind Act as a framework. The adopted DAP was also used as a basis for…

  17. 75 FR 62399 - Public Meeting To Solicit Input for a Strategic Plan for Federal Youth Policy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-08

    ...: Division F, Pub. L. 111-8; E.O. 13459, 73 FR 8003, February 12, 2008. Dated: September 30, 2010. Sherry... HUMAN SERVICES Office of the Secretary Public Meeting To Solicit Input for a Strategic Plan for Federal... the Interagency Working Group on Youth Programs, is announcing a meeting to solicit input from...

  18. 75 FR 62400 - Public Meeting To Solicit Input for a Strategic Plan for Federal Youth Policy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-08

    ...-8; E.O. 13459, 73 FR 8003, February 12, 2008. Dated: September 30, 2010. Sherry Glied, Assistant... HUMAN SERVICES Office of the Secretary Public Meeting To Solicit Input for a Strategic Plan for Federal... the Interagency Working Group on Youth Programs, is announcing a meeting to solicit input from...

  19. 75 FR 24963 - Notice of Proposed Information Collection for Public Comment: 202 Demonstration Planning Grant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... URBAN DEVELOPMENT Notice of Proposed Information Collection for Public Comment: 202 Demonstration Planning Grant Evaluation AGENCY: Office of Policy Development and Research, HUD. ACTION: Notice. SUMMARY... Development and Research, Department of Housing and Urban Development, 451 7th Street, SW., Suite...

  20. Quality, Equity, Accountability: Long-Range Plan for Public Education, 1991-1995.

    ERIC Educational Resources Information Center

    Texas State Board of Education, Austin.

    In 1989, the Texas State Board of Education undertook the responsibility for developing a 4-year plan and for establishing a vision for education that extends into the next century. This document contains the goals for education established by the 71st Texas legislature. The mission of public education in Texas is for it to be characterized by…

  1. Information and consumer choice: the value of publicized health plan ratings.

    PubMed

    Jin, Ginger Zhe; Sorensen, Alan T

    2006-03-01

    We use data on the enrollment decisions of federal annuitants to estimate the influence of publicized ratings on health plan choice. We focus on the impact of ratings disseminated by the National Committee for Quality Assurance (NCQA), and use our estimates to calculate the value of the information. Our approach exploits a novel feature of the data-the availability of non-public plan ratings-to correct for a source of bias that is inherent in studies of consumer responsiveness to information on product quality: since publicized ratings are correlated with other quality signals known to consumers (but unobserved by researchers), the estimated influence of ratings is likely to be overstated. We control for this bias by comparing the estimated impact of publicized ratings to the estimated impact of ratings that were never disclosed. The results indicate that NCQA's plan ratings had a meaningful influence on individuals' choices, particularly for individuals choosing a plan for the first time. Although we estimate that a very small fraction of individual decisions were materially affected by the information, for those that were affected the implied utility gains are substantial. PMID:16107284

  2. Analysis of Mayor Adrian Fenty's Plan for the District of Columbia Public Schools

    ERIC Educational Resources Information Center

    Council of the Great City Schools, 2007

    2007-01-01

    This report summarizes Mayor Fenty's proposed legislation to take over the District of Columbia Public Schools, compares it to actions taken or proposed by the school board, and analyzes the potential of the mayor's plan to fix underlying school system problems identified by the Council in two recent reports. The Council has produced this current…

  3. Reestablishing Public Health and Land Use Planning to Protect Public Water Supplies

    PubMed Central

    Greenberg, Michael; Mayer, Henry; Miller, K. Tyler; Hordon, Robert; Knee, Daniel

    2003-01-01

    Objectives. This study measured the extent to which land use, design, and engineering practices could reduce contamination of major public water supplies. Methods. Key parcels of land were identified in New Jersey, and the potential uncontrolled loading of contaminants was estimated with the US Environmental Protection Agency’s Long-Term Hydrologic Impact Assessment model for a variety of land use, design, and engineering scenarios. Results. High-density per-acre development and engineering controls, along with housing and light commercial activity near main railroads, would substantially reduce runoff. Conclusions. In New Jersey, government and purveyor action is being taken as a result of, and in support of, these findings. PMID:12948974

  4. Linking Climate Risk, Policy Networks and Adaptation Planning in Public Lands

    NASA Astrophysics Data System (ADS)

    Lubell, M.; Schwartz, M.; Peters, C.

    2014-12-01

    Federal public land management agencies in the United States have engaged a variety of planning efforts to address climate adaptation. A major goal of these efforts is to build policy networks that enable land managers to access information and expertise needed for responding to local climate risks. This paper investigates whether the perceived and modeled climate risk faced by different land managers is leading to larger networks or more participating in climate adaptation. In theory, the benefits of climate planning networks are larger when land managers are facing more potential changes. The basic hypothesis is tested with a survey of public land managers from hundreds of local and regional public lands management units in the Southwestern United States, as well as other stakeholders involved with climate adaptation planning. All survey respondents report their perceptions of climate risk along a variety of dimensions, as well as their participation in climate adaptation planning and information sharing networks. For a subset of respondents, we have spatially explicity GIS data about their location, which will be linked with downscaled climate model data. With the focus on climate change, the analysis is a subset of the overall idea of linking social and ecological systems.

  5. Deadline Extended for Public Comment on IOOS' Draft Plan for Data Management andCommunications Component

    NASA Astrophysics Data System (ADS)

    The U.S. Integrated Ocean Observing System (IOOS) is encouraging public comment on the draft plan for its Data Management and Communications (DMAC∥ component. The deadline for receipt of comments has been extended to 18 November 2003. The plan can be found at http://www.dmac.ocean.us/dacsc/imp_plan.jsp. The plan was developed by the DMAC Steering Committee, which includes representatives from federal and state agencies, private industry, and academia. This committee was tasked by Ocean.US (the national office for IOOS) with the preparation of a detailed, phased DMAC implementation plan, and initial oversight of its implementation. The scope of the plan includes the IOOS DMAC infrastructure, data archive and access, and basic information products needed for assessing the availability and quality of data within IOOS. Four expert teams (Data Transport, Metadata and Data Discovery, Data Archive and Access, Applications and Products), and two outreach teams (Data Facilities Management, and User Outreach), were assembled to assist in developing material for the plan.

  6. 76 FR 52731 - Notice of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific Advisory... open to the public. The meeting will be hosted by the Office of the U.S. Global AIDS Coordinator, Ambassador Eric Goosby, who leads implementation of the President's Emergency Plan for AIDS Relief...

  7. 77 FR 55891 - Notice of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ... of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific Advisory... public. The meeting will be hosted by the Office of the U.S. Global AIDS Coordinator, and led by Ambassador Eric Goosby, who leads implementation of the President's Emergency Plan for AIDS Relief...

  8. 78 FR 55326 - Notice of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific Advisory... is open to the public. The meeting will be hosted by the Office of the U.S. Global AIDS Coordinator, and led by Ambassador Eric Goosby, who leads implementation of the President's Emergency Plan for...

  9. 25 CFR 170.413 - What is the public role in developing the long-range transportation plan?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false What is the public role in developing the long-range transportation plan? 170.413 Section 170.413 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND... Roads Program Facilities Long-Range Transportation Planning § 170.413 What is the public role...

  10. 25 CFR 170.413 - What is the public role in developing the long-range transportation plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the public role in developing the long-range transportation plan? 170.413 Section 170.413 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND... Roads Program Facilities Long-Range Transportation Planning § 170.413 What is the public role...

  11. 78 FR 67348 - Invitation for Public Comment on Draft Test Plan for the High Burnup Dry Storage Cask Research...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... Invitation for Public Comment on Draft Test Plan for the High Burnup Dry Storage Cask Research and... notice of request for public comment on its draft test plan for the High Burnup Dry Storage Cask Research... development throughout the execution of the High Burnup Dry Storage Cask Research and Development Project....

  12. Water Resources Council Proposed Principles and Standards for Planning Water and Related Land Resources. Notice of Public Review and Hearing.

    ERIC Educational Resources Information Center

    National Archives and Records Services (GSA), Washington, DC. Office of the Federal Register.

    Presented in this notice of a public review and hearing are the proposed Principles and Standards for planning water and related land resources of the United States. Developed by the Water Resources Council pursuant to the Water Resources Planning Act of 1965 (Public Law 89-80), the purpose is to achieve objectives, determined cooperatively,…

  13. An evaluation of public participation in UK river basin management planning

    NASA Astrophysics Data System (ADS)

    Schmid, M.; Benson, D.

    2012-04-01

    The EU Water Framework Directive is reshaping multi-level environmental governance structures in many Member States. One area where re-structuring should be highly visible is in regards to public participation in water management. The Directive legally mandates that implementing agencies should make information publicly available relating to river basin management planning, include the public in the planning process and encourage the active involvement of 'interested parties' both during and after the planning stage. Yet critical questions arise over the extent to which these requirements have actually been met in Member States and the outcomes of participatory processes on the ground. In this study, public participation was evaluated in England and Wales by conducting: a) a broad based quantitative survey of the implementation strategy undertaken across all 11 River Basin Districts (RBDs); and, b) an in-depth analysis of the Anglian RBD drawing on theoretical notions of social learning; a critical measure of participatory processes. Results from the survey showed all RBDs complied with the minimum regulatory requirements on public access to information and written consultation, and even went further with provisions for oral consultation and stakeholder engagement. But the focus was clearly on stakeholder groups with little public involvement beyond minimal legally mandated requirements. Analysis of case study data provided some evidence of social learning at every level (instrumental, communicative and transformative) and beyond the individual scale (wider community and organisational learning). Learning was however significantly limited by participant's high level of expertise and environmental awareness. Also apparent was the influence of other factors, operating at various institutional scales, in shaping learning. The paper then speculates on the implications of the findings for both future research and policy, particularly in light of the European Commission

  14. Factors influencing the use of public dental services: An application of the Theory of Planned Behaviour

    PubMed Central

    Luzzi, Liana; Spencer, A John

    2008-01-01

    Background There is limited evidence of the influence of psychosocial factors and health beliefs on public dental patient's patterns of service use in Australia. The research aims were to examine associations between dental attitudes and beliefs of public dental service users and dental visiting intention and behaviour using the Theory of Planned Behaviour. Methods 517 randomly selected adult public dental patients completed a questionnaire assessing dental attitudes and beliefs which was matched with electronic records for past and future dental service use. A questionnaire measured intentions, attitudes, subjective norms and perceptions of behavioural control and self-efficacy in relation to visiting public dentists. A measure of dental attendance at public dental clinics was obtained retrospectively (over 3 1/2 years) and prospectively (over a one year period following the return of the questionnaire) by accessing electronic patient clinical records. Results Participants had positive attitudes, subjective norms and self-efficacy beliefs towards dental visiting but perceived a lack of control over visiting the dentist. Attitudes, subjective norms, self-efficacy and perceived control were significant predictors of intention (P < 0.05). Intentions, self-efficacy and past dental attendance were significant predictors of actual dental attendance (P < 0.05). Conclusion Public dental patients held favourable attitudes and beliefs but perceived a lack of control towards dental visiting. Reducing structural barriers may therefore improve access to public dental services. PMID:18445298

  15. A Descriptive Case Study of Appreciative Inquiry as an Approach to Strategic Planning for Special Education in a Public School

    ERIC Educational Resources Information Center

    Ruhlman, Paul L., Jr.

    2014-01-01

    This study's purpose was to describe appreciative inquiry (AI) as an approach to strategic planning for special education in a public school. The study investigated four research questions. How do plans for special education emerge as participants engage in the four phases of AI during strategic planning for the future of special education in a…

  16. 26 CFR 301.6104(a)-2 - Public inspection of material relating to pension and other plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... pension and other plans. 301.6104(a)-2 Section 301.6104(a)-2 Internal Revenue INTERNAL REVENUE SERVICE... and Returns Returns and Records § 301.6104(a)-2 Public inspection of material relating to pension and...— (i) A pension, profit-sharing, or stock bonus plan under section 401(a), (ii) An annuity plan...

  17. 26 CFR 301.6104(a)-2 - Public inspection of material relating to pension and other plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... pension and other plans. 301.6104(a)-2 Section 301.6104(a)-2 Internal Revenue INTERNAL REVENUE SERVICE... and Returns Returns and Records § 301.6104(a)-2 Public inspection of material relating to pension and...— (i) A pension, profit-sharing, or stock bonus plan under section 401(a), (ii) An annuity plan...

  18. Retiree Health Plans for Public School Teachers after GASB 43 and 45. Conference Paper 2009-03

    ERIC Educational Resources Information Center

    Clark, Robert L.

    2009-01-01

    Most public elementary and high school teachers are covered by health insurance provided by their employer while they are employed. In most cases, these health plans are managed at the state level. At retirement, teachers with sufficient years of service are allowed to remain in the health plan. Retiree health plans for teachers vary widely across…

  19. The Good, the Bad, and the Ugly: An Analysis of the Chicago Public Schools' Capital Improvement Plan.

    ERIC Educational Resources Information Center

    Ryan, Matt; Schwartz, Chris

    This report examines the Chicago Public School System's need for capital improvement, and it highlights action plans for the future. The report reveals that many planned school improvements projects are unfunded and that there is about $229 million worth of projects that no longer appear in the city's capital improvements plan. Overcrowding…

  20. How Will Rhode Island's New Hybrid Pension Plan Affect Teachers? A Report of the Public Pension Project

    ERIC Educational Resources Information Center

    Johnson, Richard W.; Butrica, Barbara A.; Haaga, Owen; Southgate, Benjamin G.

    2014-01-01

    In 2011 Rhode Island replaced the stand-alone defined benefit pension plan it provided to state employees with a hybrid plan that reduced the defined benefit component and added a 401(k)-type, defined contribution component. Although controversial, the new hybrid plan will boost retirement incomes for most of the states public school teachers. Our…

  1. Health Planning in the United States and the Decline of Public-interest Policymaking

    PubMed Central

    Melhado, Evan M

    2006-01-01

    In the 1960s and 1970s, health planning formed a major theme of American health policy. Planners aimed to improve health services and make them broadly available while using resources efficiently. This article provides a history, both intellectual and political, of the origins of planning, its rise, and—in the face of mounting problems—its decline. The story also illustrates broader changes in the culture of policymaking in American health care. From the Progressive Era through the 1960s, reform-minded experts in health worked to advance the public interest. Thereafter, they increasingly left behind public-interest ideals and their underlying extramarket values in favor of organizing and improving health care markets. Whatever the deficiencies of traditional policymaking may be, this study suggests the need to resurrect extramarket values in health policy. PMID:16771822

  2. US Department of Energy Oak Ridge Operations Environmental Management Public Involvement Plan for the Oak Ridge Reservation

    SciTech Connect

    1996-03-01

    This document was prepared in accordance with CERCLA requirements for writing community relations plans. It includes information on how the DOE Oak Ridge Operations Office prepares and executes Environmental Management Community relations activities. It is divided into three sections: the public involvement plan, public involvement in Oak Ridge, and public involvement in 1995. Four appendices are also included: environmental management in Oak Ridge; community and regional overview; key laws, agreements, and policy; and principal contacts.

  3. The contributions of managed care plans to public health practice: evidence from the nation's largest local health departments.

    PubMed Central

    Mays, G. P.; Halverson, P. K.; Stevens, R.

    2001-01-01

    OBJECTIVE: The authors examine the extent and nature of managed care plans participating in local public health activities. METHODS: In 1998, the authors surveyed the directors of all US local health departments serving jurisdictions of at least 100,000 residents to collect information about public health activities performed in their jurisdictions and about organizations participating in the activities. Multivariate logistic and linear regression models were used to examine organizational and market characteristics associated with managed care plan participation in public health activities. RESULTS: Managed care plans were reported to participate in public health activities in 164 (46%) of the jurisdictions surveyed, and to contribute to 13% of the public health activities performed in the average jurisdiction. Plans appeared most likely to participate in public health activities involving the delivery or management of personal health services and the exchange of health-related information. Managed care participation was more likely to occur in jurisdictions with higher HMO penetration, fewer competing plans, and larger proportions of plans enrolling Medicaid recipients. Participation was positively associated with the overall scope and perceived effectiveness of local public health activities. CONCLUSIONS: Although plans participate in a narrow range of activities, these contributions may complement the work of public health agencies. PMID:11889275

  4. Decoupling the use and meaning of strategic plans in public healthcare

    PubMed Central

    2013-01-01

    Background The culture of New Public Management has promoted the diffusion of strategic management tools throughout Public Healthcare Organisations (PHOs). There is consensus that better strategic planning tools are required to achieve higher levels of organisational performance. This paper provides evidence and understanding of the emergent uses and scope of strategic planning in PHOs, in order to answer three research questions: (i) has the New Public Management approach changed the organisational culture of PHOs in terms of how they adopt, diffuse, and use strategic planning documents? (ii) how coherent are strategic planning documents in PHOs? and (iii) what are the main purposes of strategic documents in PHOs? Methods An analysis was carried out in three Italian Local Health Authorities. We analysed the number and types of formal strategic documents adopted between 2004 and 2012, evaluating their degree of coherence and coordination, their hierarchy, their degree of disclosure, and the consistency of their strategic goals. A content analysis was performed to investigate overlap in terms of content and focus, and a qualitative analysis was carried out to study and represent the relationships between documents. Results The analysis showed that a rich set of strategic documents were adopted by each PHO. However, these are often uncoordinated and overlap in terms of content. They adopt different language and formats for various stakeholders. The presence of diverse external drivers may explain the divergent focus, priorities and inconsistent goals in the strategic documents. This planning complexity makes it difficult to determine how the overall goals and mission of an organisation are defined and made visible. Conclusions The evidence suggests that PHOs use a considerable number of strategic documents. However, they employ no clear or explicit overarching strategy currently, and strategic planning appears to be externally oriented. All the documents communicate

  5. The role of law in public health: the case of family planning in the Philippines.

    PubMed

    Mello, Michelle Marie; Powlowski, Marcus; Nañagas, Juan M P; Bossert, Thomas

    2006-07-01

    Compared to neighboring countries, the Philippines has high fertility rates and a low prevalence of modern-method contraception use. The Philippine government faces political and cultural barriers to addressing family planning needs, but also legal barriers erected by its own policies. We conducted a review of laws and policies relating to family planning in the Philippines in order to examine how the law may facilitate or constrain service provision. The methodology consisted of three phases. First, we collected and analyzed laws and regulations relating to the delivery of family planning services. Second, we conducted a qualitative interview study. Third, we synthesized findings to formulate policy recommendations. We present a conceptual model for understanding the impact of law on public health and discuss findings in relation to the roles of health care provider regulation, drug regulation, tax law, trade policies, insurance law, and other laws on access to modern-method contraceptives. PMID:16488063

  6. Financing and planning of public and private not-for-profit hospitals in the European Union.

    PubMed

    Thompson, Ceri R; McKee, Martin

    2004-03-01

    While much has been written about health care financing in Europe in recent years, discussion has almost entirely focused on revenue. In contrast, there has been remarkably little written on financing of capital investment in European health care systems. Yet major changes are underway in several countries, in particular involving new forms of public-private partnerships (PPP). At the same time, there is growing recognition of the way in which the inherited structure of the health care delivery system constrains the system's ability to adapt to changing circumstances. This paper reports the results of a survey undertaken among key informants in the member states of the European Union to begin to ascertain existing practices and future plans in relation to hospital planning and financing amongst public and private not-for-profit hospitals. The locus of hospital planning decisions reflect the constitutional framework of the country involved, and thus the emphasis on national or local plans. There has been an expansion of private sector involvement, with four basic models identified: private loans direct to the hospital; private loans to a regional health body; a PPP where the private sector's role is to build, design and operate the non-clinical functions of the hospital; and, finally, a PPP, where the private sector's involvement also includes management of the clinical functions of the hospital. It is too early to say whether these approaches will be more successful than the models they are replacing. PMID:15036816

  7. Chicago neoliberalism versus Cowles planning: perspectives on patents and public goods in Cold War economic thought.

    PubMed

    Van Horn, Robert; Klaes, Matthias

    2011-01-01

    In post-Sputnik America, when many policymakers and social scientists feared the Soviet Union had a technological advantage over the United States, assessing the relative importance of patents for inventive activity and examining whether scientific research constituted a public good were paramount concerns. The neoliberals of the University of Chicago and the planners of the Cowles Commission both spoke to these issues. This paper sheds light on their views on patents and public goods in the late 1950s and early 1960s by examining representatives of Cowles and Chicago, Kenneth Arrow and Ronald Coase, respectively. Furthermore, it evaluates whether their views on patents and public goods clashed with the interests of RAND, at which both Arrow and Coase worked at some point during this time period. The paper argues that the Chicago-neoliberal position of Coase undermined the interests of RAND, while the Cowles-planning conclusions of Arrow furthered those interests. PMID:21732377

  8. Planning of public healthcare facility using a location allocation modelling: A case study

    NASA Astrophysics Data System (ADS)

    Shariff, S. Sarifah Radiah; Moin, Noor Hasnah; Omar, Mohd

    2014-09-01

    Finding the correct location of any facility and determining the demands which are to be assigned to it is very crucial in public health service. This is to ensure that the public gain maximum benefits. This article analyzes the previous location decisions of public primary healthcare (PHC) facilities in the district of Kuala Langat, Malaysia. With total population of 220214 (in 2010), the PHC in the district is currently served by 28 facilities. The percentages of total population covered (in 2007) within the maximum allowable distance of 3km and 5km are 69.7 percent and 77.8 percent respectively. This is very low compared to the Malaysian National Health Policy of Health for All or 100 percent coverage. The determination of health facility location should be planned carefully to further increase effective primary health service to the nation that is required for economic sustainability.

  9. 32 CFR 644.24 - Acquisition by Transfer from other Government Departments or Agencies (except Public Domain).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Military... Estate Planning Report (Figure 2-1 in ER 405-1-12) (or a brief report, if it is determined this would...

  10. Computers in Public Broadcasting: Who, What, Where.

    ERIC Educational Resources Information Center

    Yousuf, M. Osman

    This handbook offers guidance to public broadcasting managers on computer acquisition and development activities. Based on a 1981 survey of planned and current computer uses conducted by the Corporation for Public Broadcasting (CPB) Information Clearinghouse, computer systems in public radio and television broadcasting stations are listed by…

  11. The Dreyfus Model of Skill Acquisition: A Career Development Framework for Succession Planning and Management in Academic Libraries

    ERIC Educational Resources Information Center

    Hall-Ellis, Sylvia D.; Grealy, Deborah S.

    2013-01-01

    Succession planning and management are critical parts of strategic planning for libraries in the twenty-first century. Making certain that the right people are in place with the prerequisite training and experience to assume leadership positions is a vital part of strategic planning and talent management in libraries that rely on teams of people…

  12. 76 FR 44308 - Request for Public Comments on the Definition of “Produced” in Defense Federal Acquisition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-25

    ... DFARS Case 2008-D003, Restriction on Acquisition of Specialty Metals, at 73 FR 42300 on July 21, 2008... rule. DoD published a final rule at 74 FR 37626 on July 29, 2009. The Federal Register notice... non-melt derived titanium powder or titanium alloy powder.'' Ynette R. Shelkin, Editor,...

  13. Public Participation Plan for Waste Area Group 7 Operable Unit 7-13/14 at the Idaho National Laboratory Site

    SciTech Connect

    B. G. Meagher

    2007-07-17

    This Public Participation Plan outlines activities being planned to: (1) brief the public on results of the remedial investigation and feasibility study, (2) discuss the proposed plan for remediation of Operable Unit 7-13/14 with the public, and (3) encourage public participation in the decision-making process. Operable Unit 7-13/14 is the Comprehensive Remedial Investigation/Feasibility Study for Waste Area Group 7. Analysis focuses on the Subsurface Disposal Area (SDA) within the Radioactive Waste Management Complex at the Idaho National Laboratory (Site). This plan, a supplement to the Idaho National Laboratory Community Relations Plan (DOE-ID 2004), will be updated as necessary. The U.S. Department of Energy (DOE), Idaho Department of Environmental Quality (DEQ), and U.S. Environmental Protection Agency (EPA) will participate in the public involvement activities outlined in this plan. Collectively, DOE, DEQ, and EPA are referred to as the Agencies. Because history has shown that implementing the minimum required public involvement activities is not sufficient for high-visibility cleanup projects, this plan outlines additional opportunities the Agencies are providing to ensure that the public’s information needs are met and that the Agencies can use the public’s input for decisions regarding remediation activities.

  14. 48 CFR 12.301 - Solicitation provisions and contract clauses for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and contract clauses for the acquisition of commercial items. 12.301 Section 12.301 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Solicitation Provisions and Contract Clauses for the Acquisition of Commercial Items...

  15. State family planning and abortion expenditures: their effect on public health.

    PubMed Central

    Meier, K J; McFarlane, D R

    1994-01-01

    OBJECTIVES. This study examines whether state family planning expenditures and abortion funding for Medicaid-eligible women might reduce the number of low-birthweight babies, babies with late or no prenatal care, and premature births, as well as the rates of infant and neonatal mortality. METHODS. Using a pooled time-series analysis from 1982 to 1988 with the 50 states as units of analysis, this study assessed the impact of family planning expenditures and abortion funding on several public health outcomes while controlling for other important variables and statistical problems inherent in pooled time-series studies. RESULTS. States that funded abortions had a significantly higher rate of abortions and significantly lower rates of teen pregnancy, low-birthweight babies, premature births, and births with late or no prenatal care. States that had higher expenditures for family planning had significantly fewer abortions, low-birthweight babies, births with late or no prenatal care, infant deaths, and neonatal deaths. CONCLUSIONS. Funding abortions for Medicaid-eligible women and increasing the level of expenditures for family planning are associated with major differences in infant and maternal health in the United States. PMID:8092373

  16. MRO's High Resolution Imaging Science Experiment (HiRISE): Education and Public Outreach Plans

    NASA Technical Reports Server (NTRS)

    Gulick, V.; McEwen, A.; Delamere, W. A.; Eliason, E.; Grant, J.; Hansen, C.; Herkenhoff, K.; Keszthelyi, L.; Kirk, R.; Mellon, M.

    2003-01-01

    The High Resolution Imaging Experiment, described by McEwen et al. and Delamere et al., will fly on the Mars 2005 Orbiter. In conjunction with the NASA Mars E/PO program, the HiRISE team plans an innovative and aggressive E/PO effort to complement the unique high-resolution capabilities of the camera. The team is organizing partnerships with existing educational outreach programs and museums and plans to develop its own educational materials. In addition to other traditional E/PO activities and a strong web presence, opportunities will be provided for the public to participate in image targeting and science analysis. The main aspects of our program are summarized.

  17. TMT: An International Plan for Workforce, Education, Public Outreach and Communications

    NASA Astrophysics Data System (ADS)

    Squires, Gordon; Brewer, Janesse; Dawson, Sandra; Pompea, Stephen M.

    2015-08-01

    The Thirty Meter Telescope (TMT) is an international project involving Canada, China, India, Japan and the United States. When completed in the early 2020s, TMT will be among the world's largest optical/near-infrared telescopes and enable cutting-edge science across the full astrophysics landscape. TMT science and technology is international in scope, meaning that TMT strives to be an observatory-class facillity for astronomers in all of the partner constituencies. In this presentation, we will describe the goals, opportunities, and needs for developing a partnership-wide Workforce, Education, Public Outreach and Communications (WEPOC) plan to support the key elements of the TMT observatory and partnership. Central to this plan is the commitment to be relevant and responsive to all of the partners, fully leverage all phases of the project, and project forward through the 50 year lifetime of the observatory.

  18. Environmental Risks to Public Health in the United Arab Emirates: A Quantitative Assessment and Strategic Plan

    PubMed Central

    Farah, Zeinab S.

    2012-01-01

    Background: Environmental risks to health in the United Arab Emirates (UAE) have shifted rapidly from infectious to noninfectious diseases as the nation has developed at an unprecedented rate. In response to public concerns over newly emerging environmental risks, the Environment Agency–Abu Dhabi commissioned a multidisciplinary environmental health strategic planning project. Objectives: In order to develop the environmental health strategic plan, we sought to quantify the illnesses and premature deaths in the UAE attributable to 14 environmental pollutant categories, prioritize these 14 risk factors, and identify interventions. Methods: We estimated the disease burden imposed by each risk factor using an attributable fraction approach, and we prioritized the risks using an empirically tested stakeholder engagement process. We then engaged government personnel, scientists, and other stakeholders to identify interventions. Results: The UAE’s environmental disease burden is low by global standards. Ambient air pollution is the leading contributor to premature mortality [~ 650 annual deaths; 95% confidence interval (CI): 140, 1,400]. Risk factors leading to > 10,000 annual health care facility visits included occupational exposures, indoor air pollution, drinking water contamination, seafood contamination, and ambient air pollution. Among the 14 risks considered, on average, outdoor air pollution was ranked by the stakeholders as the highest priority (mean rank, 1.4; interquartile range, 1–2) and indoor air pollution as the second-highest priority (mean rank 3.3; interquartile range, 2–4). The resulting strategic plan identified 216 potential interventions for reducing environmental risks to health. Conclusions: The strategic planning exercise described here provides a framework for systematically deciding how to invest public funds to maximize expected returns in environmental health, where returns are measured in terms of reductions in a population

  19. Public transportation 1995: Current research in planning, management, technology, and ridesharing. Transportation research record

    SciTech Connect

    1995-12-31

    ;Partial Contents: Long-Range Planning Issues for Small Transit Agencies; Methods and Strategies for Transit Benefit Measurement; Relationships Between Public Transport Finance and National Economy in The Netherlands; Modifying Transit Mode Share in Household Survey Expansion; Measuring Impacts of Transit Financing Policy in Geopolitical Context: Montreal Case; Perspective on Maglev Transit and Introduction of Personal Rapid Transit Maglev; Profile of Employee Transportation Coordinators; Demographics of Carpooling; Carpooling with Co-workers in Los Angeles: Employer Involvement Does Make a Difference; Stated Choice-Based Performance Evaluation of Selected Transportation Control Measures and Their Transfer Across Sites; and Five-Year Results of Employee Commute Options in Southern California.

  20. Public transit 1997: Planning, management, marketing and new technology. Transportation research record

    SciTech Connect

    1997-09-01

    Partial Contents: Transit Service Design and Operation Practices in Western European Countries; Understanding Differences in Public Transit: Comparison of Boston and Toronto; Influence of the Metropolitan Atlanta Rapid Transit Authority on Population and Employment Location; Integrated Decision Support Tool for Evaluating Transit and Land-Use Coordination Policies; Transit Friendliness Factor: Approach to Quantifying Transit Access Environment in a Transportation Planning Model; Pedestrian Access to Transit: Model of Walk Trips and Their Design and Urban Form Determinants Around Bay Area Rapid Transit Stations; Parking Supply Policy and Transit Use: Case Study of Atlanta, Georgia; Mobility Analysis of Transit Systems; Research on Customer Requirements for Transit Service Design and Delivery.

  1. The National Response Plan: a new framework for homeland security, public health, and bioterrorism response.

    PubMed

    Kamoie, Brian

    2005-01-01

    This Article provides a detailed overview of the new National Response Plan (NRP) with a focus on its applicability to bioterrorism and other public health emergencies. The Article highlights critical policy and legal issues left unresolved by the NRP, and offers recommendations for the resolution of those issues. The author concludes that, although the NRP is not perfect, it represents a major advance in domestic incident management and provides regular opportunities for review and revision as we learn how to best coordinate the national response to major incidents. A close working relationship between the Departments of Health and Human Services and Homeland Security should enable a unified response to bioterrorism and other public health emergencies in support of state and local efforts. PMID:16270671

  2. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1983-01-01

    This publication reports on developments in programs managed by JPL's office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground based radio astronomy, it reports on activities of the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) in planning, in supporting research and technology, in implementation and in operations. In geodynamics, the publication reports on the application of radio interferometry at microwave frequencies for geodynamic measurements. This publication also reports on implementation and operations for searching the microwave spectrum.

  3. Location-allocation and accessibility models for improving the spatial planning of public health services.

    PubMed

    Polo, Gina; Acosta, C Mera; Ferreira, Fernando; Dias, Ricardo Augusto

    2015-01-01

    This study integrated accessibility and location-allocation models in geographic information systems as a proposed strategy to improve the spatial planning of public health services. To estimate the spatial accessibility, we modified the two-step floating catchment area (2SFCA) model with a different impedance function, a Gaussian weight for competition among service sites, a friction coefficient, distances along a street network based on the Dijkstra's algorithm and by performing a vectorial analysis. To check the accuracy of the strategy, we used the data from the public sterilization program for the dogs and cats of Bogot´a, Colombia. Since the proposed strategy is independent of the service, it could also be applied to any other public intervention when the capacity of the service is known. The results of the accessibility model were consistent with the sterilization program data, revealing that the western, central and northern zones are the most isolated areas under the sterilization program. Spatial accessibility improvement was sought by relocating the sterilization sites using the maximum coverage with finite demand and the p-median models. The relocation proposed by the maximum coverage model more effectively maximized the spatial accessibility to the sterilization service given the non-uniform distribution of the populations of dogs and cats throughout the city. The implementation of the proposed strategy would provide direct benefits by improving the effectiveness of different public health interventions and the use of financial and human resources. PMID:25775411

  4. Public health education: A report from Mosul and a plan for change

    PubMed Central

    Hughes, Gail D; Mack, Ally; Golden, Kathie Stromile

    2005-01-01

    Background Today Iraq suffers from severe shortages of food, medicine, clean water and adequate sanitation. Malnutrition and communicable diseases are major factors in the rising morbidity and mortality rates. However, supplies and equipment are insufficient or outmoded, and public health training is outdated. The Universities have been unable to help because under-funding and isolation from their professional colleagues has limited their effectiveness. Methods To revitalize public health education, we describe a partnership between a US education consortium and the University of Mosul that will be carried out in the next several years. The plan is based on "three R's": Recovery from the past damage due to war and neglect; Retooling of key public health faculty to remedy the years of isolation and restriction of activity; and Reestablishment of the University as a resource for the its constituents, for the community and for other educational institutions. In all these activities, Iraqi minorities, especially women, will participate and contribute. Conclusion The work to repair the public health educational infrastructure has just begun. When completed, it will represent a small but necessary step in restoring normalcy to the people of Mosul, and of Iraq. PMID:15801984

  5. Location-Allocation and Accessibility Models for Improving the Spatial Planning of Public Health Services

    PubMed Central

    Polo, Gina; Acosta, C. Mera; Ferreira, Fernando; Dias, Ricardo Augusto

    2015-01-01

    This study integrated accessibility and location-allocation models in geographic information systems as a proposed strategy to improve the spatial planning of public health services. To estimate the spatial accessibility, we modified the two-step floating catchment area (2SFCA) model with a different impedance function, a Gaussian weight for competition among service sites, a friction coefficient, distances along a street network based on the Dijkstra’s algorithm and by performing a vectorial analysis. To check the accuracy of the strategy, we used the data from the public sterilization program for the dogs and cats of Bogot´a, Colombia. Since the proposed strategy is independent of the service, it could also be applied to any other public intervention when the capacity of the service is known. The results of the accessibility model were consistent with the sterilization program data, revealing that the western, central and northern zones are the most isolated areas under the sterilization program. Spatial accessibility improvement was sought by relocating the sterilization sites using the maximum coverage with finite demand and the p-median models. The relocation proposed by the maximum coverage model more effectively maximized the spatial accessibility to the sterilization service given the non-uniform distribution of the populations of dogs and cats throughout the city. The implementation of the proposed strategy would provide direct benefits by improving the effectiveness of different public health interventions and the use of financial and human resources. PMID:25775411

  6. 76 FR 10476 - (General Provisions) Contract Appeals and the Acquisition Regulation: General, Acquisition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-25

    ... 1991-AB81 (General Provisions) Contract Appeals and the Acquisition Regulation: General, Acquisition Planning, and Contracting Methods and Contract Types Correction In rule document 2011-1320 appearing...

  7. 75 FR 78338 - Notice of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific Advisory... Emergency Plan for AIDS Relief (PEPFAR) Scientific Advisory Board will meet on January 6-7, 2011 at the St.... Global AIDS Coordinator, Ambassador Eric Goosby, who leads implementation of the President's...

  8. From Outreach to Engaged Placemaking: Understanding Public Land-Grant University Involvement with Tourism Planning and Development

    ERIC Educational Resources Information Center

    Herts, Rolando D.

    2013-01-01

    This dissertation research project aimed to identify benefits and drawbacks of public land-grant university involvement with tourism planning and development, an emergent form of university-community engagement. Using qualitative methodology, the study's findings led to the codification of levels of university tourism planning and development…

  9. Budget Planning and the Quality of Educational Services in Uganda Public Universities: A Case Study of Kyambogo University

    ERIC Educational Resources Information Center

    Basheka, Benon C.; Nabwire, Addah

    2013-01-01

    This paper examines the relationship between budget planning and the quality of educational services at Kyambogo University in Uganda. We argue that the manner in which the university's budget planning activities are conducted determines in a significant way (by 76.8%) the quality of the services offered by public universities in Uganda. The…

  10. 76 FR 11681 - Improving Public Safety Communications in the 800 MHz Band; New 800 MHz Band Plan for Puerto Rico...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ...This document summarizes the Fourth Report and Order, which establishes a new 800 MHz band plan for the U.S. Virgin Islands (USVI). This action is necessary to meet the Commission's goals to improve public safety communications in the 800 MHz band. The effect of this order ensures an orderly and efficient transition to the new 800 MHz band plan in the...

  11. Planning for a Statewide System of Public Higher Education: Fifty Years of Trial, Error, and Eventual Success in Georgia.

    ERIC Educational Resources Information Center

    Fincher, Cameron

    Fifty years of planning in the Georgia statewide system of public higher education is reviewed. Based on planning completed by survey experts in 1933 and a 1940 re-study of conditions in the university system, recurrent themes were identified including the following: the geographic distribution of institutions and programs, the role of general…

  12. 75 FR 35315 - Improving Public Safety Communications in the 800 MHz Band; New 800 MHz Band Plan for Puerto Rico...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... public safety and other land mobile communication systems operating in the band, 69 FR 67823, November 22... Puerto Rico market compared to other markets, 72 FR 39756, July 20, 2007. Rather than specify a band plan... 800 MHz band reconfiguration in Puerto Rico as well as alternative band plans, 73 FR 40274, July...

  13. The Telecommunications and Data Acquisition

    NASA Technical Reports Server (NTRS)

    Posner, Edward C. (Editor)

    1992-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Communications (OSC).

  14. 76 FR 11216 - Notice of Public Meetings for the Draft Environmental Impact Statement for Land Acquisition and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-01

    ... Department of the Navy Notice of Public Meetings for the Draft Environmental Impact Statement for Land... Impact Statement (EIS) that evaluates potential environmental impacts associated with the proposed... on May 26, 2011. The USMC is holding three informational open house style public meetings to...

  15. Applying Ajzen's Theory of Planned Behavior to a Study of Online Course Adoption in Public Relations Education

    ERIC Educational Resources Information Center

    Knabe, Ann Peru

    2012-01-01

    This study used Icek Ajzen's Theory of Planned Behavior to research public relations faculty intentions of teaching online. All of the main predictor variables (Subjective Norms, Attitude toward the Act and Perceived Behavioral Control) were statistically significant at varying degrees in predicting intent to teach public relations online. Of the…

  16. 78 FR 63464 - William D. Ford Federal Direct Loan Program Repayment Plan Selection Form; Extension of Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION William D. Ford Federal Direct Loan Program Repayment Plan Selection Form; Extension of Public Comment... (Page 61347, Column 2) seeking public comment for an information collection entitled, ``William D....

  17. Private and Public Sector Enterprise Resource Planning System Post-Implementation Practices: A Comparative Mixed Method Investigation

    ERIC Educational Resources Information Center

    Bachman, Charles A.

    2010-01-01

    While private sector organizations have implemented enterprise resource planning (ERP) systems since the mid 1990s, ERP implementations within the public sector lagged by several years. This research conducted a mixed method, comparative assessment of post "go-live" ERP implementations between public and private sector organization. Based on a…

  18. Use of Technology to Support Information Needs for Continuity of Operations Planning in Public Health: A Systematic Review

    PubMed Central

    Reeder, Blaine; Turner, Anne; Demiris, George

    2010-01-01

    Objectives Continuity of operations planning focuses on an organization’s ability to deliver essential services before, during and after an emergency. Public health leaders must make decisions based on information from many sources and their information needs are often facilitated or hindered by technology. The aim of this study is to provide a systematic review of studies of technology projects that address public health continuity of operations planning information needs and to discuss patterns, themes, and challenges to inform the design of public health continuity of operations information systems. Methods: To return a comprehensive results set in an under-explored area, we searched broadly in the Medline and EBSCOHost bibliographic databases using terms from prior work in public health emergency management and continuity of operations planning in other domains. In addition, we manually searched the citation lists of publications included for review. Results: A total of 320 publications were reviewed. Twenty studies were identified for inclusion (twelve risk assessment decision support tools, six network and communications-enabled decision support tools, one training tool and one dedicated video-conferencing tool). Levels of implementation for information systems in the included studies range from proposed frameworks to operational systems. Conclusion: There is a general lack of documented efforts in the scientific literature for technology projects about public health continuity of operations planning. Available information about operational information systems suggest inclusion of public health practitioners in the design process as a factor in system success. PMID:23569577

  19. 75 FR 57492 - Notice of Submission of Proposed Information Collection to OMB Public Housing 5 Year Annual PHA Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... URBAN DEVELOPMENT Notice of Submission of Proposed Information Collection to OMB Public Housing 5 Year... public comments on the subject proposal. PHAs are required to submit annual and 5-Year Plans to HUD as required by section 5A of the United States Housing Act of 1937 (42 U.S.C. 1437c-1) The purpose of the...

  20. 77 FR 59607 - El Paso Natural Gas Company; Notice of Public Scoping Meetings for the Planned SASABE Lateral...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... Energy Regulatory Commission El Paso Natural Gas Company; Notice of Public Scoping Meetings for the... or Commission) Office of Energy Project's staff will hold public scoping meetings for El Paso Natural Gas Company's (El Paso) Sasabe Lateral Project (Project). The Project is a planned 60-...

  1. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1993-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA.

  2. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1983-01-01

    Developments in programs in telecommunication and data acquisition in space communications, radio navigation, radio science, and ground based radio astronomy are reported. Activities of the deep space network (DSN) and its associated ground communication facility (GCF) in planning, supporting research and technology, implementation, and in operations are outlined. The publication of reports on the application of radio interferometry at microwave frequencies for geodynamic measurements are presented. Implementation and operation for searching the microwave spectrum is reported.

  3. Science in the Public Sphere: Greater Sage-grouse Conservation Planning from a Transdisciplinary Perspective

    USGS Publications Warehouse

    Torregrosa, Alicia; Casazza, Michael L.; Caldwell, Margaret R.; Mathiasmeier, Teresa A.; Morgan, Peter M.; Overton, Cory T.

    2010-01-01

    Integration of scientific data and adaptive management techniques is critical to the success of species conservation, however, there are uncertainties about effective methods of knowledge exchange between scientists and decisionmakers. The conservation planning and implementation process for Greater Sage-grouse (Centrocercus urophasianus; ) in the Mono Basin, Calif. region, was used as a case study to observe the exchange of scientific information among stakeholders with differing perspectives; resource manager, scientist, public official, rancher, and others. The collaborative development of a risk-simulation model was explored as a tool to transfer knowledge between stakeholders and inform conservation planning and management decisions. Observations compiled using a transdisciplinary approach were used to compare the exchange of information during the collaborative model development and more traditional interactions such as scientist-led presentations at stakeholder meetings. Lack of congruence around knowledge needs and prioritization led to insufficient commitment to completely implement the risk-simulation model. Ethnographic analysis of the case study suggests that further application of epistemic community theory, which posits a strong boundary condition on knowledge transfer, could help support application of risk simulation models in conservation-planning efforts within similarly complex social and bureaucratic landscapes.

  4. Brazilian public policies for reproductive health: family planning, abortion and prenatal care.

    PubMed

    Guilhem, Dirce; Azevedo, Anamaria Ferreira

    2007-08-01

    This study is an ethical reflection on the formulation and application of public policies regarding reproductive health in Brazil. The Integral Assistance Program for Women's Health (PAISM) can be considered advanced for a country in development. Universal access for family planning is foreseen in the Brazilian legislation, but the services do not offer contraceptive methods for the population in a regular and consistent manner. Abortion is restricted by law to two cases: risk to the woman's life and rape. This reality favors the practice of unsafe abortion, which is the third largest cause of maternal death in Brazil. Legal abortion is regulated by the State and the procedure is performed in public health centers. However, there is resistance on the part of professionals to attend these women. Prenatal care is a priority strategy for promoting the quality of life of these women and of future generations. Nonetheless, it is still difficult for these women to access the prenatal care services and to have the required number of consultations. Moreover, managers and health professionals need to be made aware of the importance of implementing the actions indicated by the public policies in the area of sexual and reproductive health, favoring respect for autonomy in a context of personal freedom. PMID:17614992

  5. MRO's High Resolution Imaging Science Experiment (HiRISE): Education and public Outreach Plans

    NASA Astrophysics Data System (ADS)

    Gulick, V. C.

    2004-12-01

    The High Resolution Imaging Science Experiment (HiRISE) will fly on the Mars Reconnaissance Orbiter (MRO) mission, planned for launch in August of 2005. HiRISE will investigate deposits and landforms resulting from geologic and climatic processes and is optimized for the evaluation of candidate landing sites. The camera will combine unprecedented resolution (25-50 cm/pixel) and signal-to-noise ratio with a 5-10 km swath width and partial 3-color coverage. HiRISE will image a carefully selected few percent of the surface area of Mars on a variety of scales down to 1 meter, a resolution currently afforded only in glimpses by landers. Therefore, HiRISE will provide a bridge between orbital remote sensing and landed missions. The HiRISE E/PO effort focuses on involving students and the public directly in image suggestion and data analysis. HiWeb (http://marsoweb.nasa.nasa.gov/hirise), HiRISE's public website will provide user-friendly web tools for students, the team, and the general public to suggest target locations for HiRISE imaging. Web tools will also provide interactive viewing and analysis of HiRISE images in context with other available Mars data. Web events, involving participation by team members, will inform students and interested members of the public of HiRISE capabilities and science goals and help focus the public image suggestions. Curriculum modules will focus on the image suggestion process and on working with digital data of planetary surfaces. These modules will also be translated into Spanish and other languages. We will also provide online opportunities for students and the public to participate in data analysis by helping to create databases of a variety of geologic features (gullies, boulders, craters, wind streaks, etc.) present in the HiRISE images (see http://clickworkers.arc.nasa.gov for examples with current Mars image data). Starting in 2006, educator workshops will be held each year at or near the institution of HiRISE team members

  6. The Palau AHEC--academizing the public health work plan: capacity development and innovation in Micronesia.

    PubMed

    Dever, Greg; Finau, Sitaleki; Kuartei, Stevenson; Durand, A Mark; Rykken, David; Yano, Victor; Untalan, Pedro; Withy, Kelley; Tellei, Patrick; Baravilala, Wame; Pierantozzi, Sandra; Tellei, Jullie

    2005-03-01

    The Palau Area Health Education Center (AHEC)--a program of the University of Hawaii's John A. Burns School of Medicine (JABSOM) and based at Palau Community College--was established in 2001 in response to the recommendations of the 1998 Institute of Medicine (IOM) report--Pacific Partnerships for Health--Charting a New Course for the 21st Century1. One of IOM's core recommendations was to promote the training of the primary health care workforce among the U.S.-Associated Pacific Islands. Since its inception in 2001, the Palau AHEC has coordinated overall 37 postgraduate and undergraduate courses in General Practice and Public Health taught by the University of Auckland Faculty of Medicine and Health Sciences and the Fiji School of Medicine's School of Public Health and Primary Care (SPH&PC) in Palau, Yap State, and the Republic of the Marshall Islands. Currently 139 physicians, nurses, health administrators, and environmental health workers are registered as active students in Palau (58), Yap State (22), and the RMI (59). Notably, the Palau AHEC and the SPH&PC have worked in an innovative partnership with the Palau Ministry of Health to operationalize the MOH's public health work plan to implement a comprehensive community health survey of all 4,376 households in Palau, interviewing 79% of the total population, to determine Palau's health indicators. To accomplish this, the SPH&PC developed and taught a curriculum for Palau physicians and public health nurses on how to design the survey, gather, and analyze data in order to develop and implement appropriately responsive intervention and treatment programs to address Palau's old and newer morbidities. In early FY2005, two other Micronesian AHECs--the Yap State and Commonwealth of the Northern Mariana Islands AHECs--were funded through JABSOM administered grants which will also address the primary care training needs of Micronesia's remote and isolated health workforce. PMID:18181474

  7. Return on Investment: A Fuller Assessment of the Benefits and Cost Savings of the US Publicly Funded Family Planning Program

    PubMed Central

    Frost, Jennifer J; Sonfield, Adam; Zolna, Mia R; Finer, Lawrence B

    2014-01-01

    Context Each year the United States’ publicly supported family planning program serves millions of low-income women. Although the health impact and public-sector savings associated with this program's services extend well beyond preventing unintended pregnancy, they never have been fully quantified. Methods Drawing on an array of survey data and published parameters, we estimated the direct national-level and state-level health benefits that accrued from providing contraceptives, tests for the human immunodeficiency virus (HIV) and other sexually transmitted infections (STIs), Pap tests and tests for human papillomavirus (HPV), and HPV vaccinations at publicly supported family planning settings in 2010. We estimated the public cost savings attributable to these services and compared those with the cost of publicly funded family planning services in 2010 to find the net public-sector savings. We adjusted our estimates of the cost savings for unplanned births to exclude some mistimed births that would remain publicly funded if they had occurred later and to include the medical costs for births through age 5 of the child. Findings In 2010, care provided during publicly supported family planning visits averted an estimated 2.2 million unintended pregnancies, including 287,500 closely spaced and 164,190 preterm or low birth weight (LBW) births, 99,100 cases of chlamydia, 16,240 cases of gonorrhea, 410 cases of HIV, and 13,170 cases of pelvic inflammatory disease that would have led to 1,130 ectopic pregnancies and 2,210 cases of infertility. Pap and HPV tests and HPV vaccinations prevented an estimated 3,680 cases of cervical cancer and 2,110 cervical cancer deaths; HPV vaccination also prevented 9,000 cases of abnormal sequelae and precancerous lesions. Services provided at health centers supported by the Title X national family planning program accounted for more than half of these benefits. The gross public savings attributed to these services totaled approximately

  8. 17 CFR 250.41 - Exemption of public utility subsidiaries with respect to limited acquisition of utility assets.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) GENERAL RULES AND REGULATIONS, PUBLIC... operated by the acquiring company. (b) Gas utility assets. Any gas utility assets to be acquired are located in or adjacent to the same service area as that in which gas utility assets already owned...

  9. 17 CFR 250.41 - Exemption of public utility subsidiaries with respect to limited acquisition of utility assets.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) GENERAL RULES AND REGULATIONS, PUBLIC... operated by the acquiring company. (b) Gas utility assets. Any gas utility assets to be acquired are located in or adjacent to the same service area as that in which gas utility assets already owned...

  10. Student Acquisition of Biological Evolution-Related Misconceptions: The Role of Public High School Introductory Biology Teachers

    ERIC Educational Resources Information Center

    Yates, Tony Brett

    2011-01-01

    In order to eliminate student misconceptions concerning biological evolution, it is important to identify their sources. The purposes of this study were to: (a) identify biological evolution-related misconceptions held by Oklahoma public high school Biology I teachers; (b) identify biological evolution-related misconceptions held by Oklahoma…

  11. Responsive partisanship: public support for the clinton and obama health care plans.

    PubMed

    Kriner, Douglas L; Reeves, Andrew

    2014-08-01

    We examine the contours of support for the Clinton and Obama health care plans during the 1990s and 2000s based on our own compilation of 120,000 individual-level survey responses from throughout the debates. Despite the rise of the Tea Party, and the racialization of health care politics, opinion dynamics are remarkably similar in both periods. Party ID is the single most powerful predictor of support for reform and the president's handling of it. Contrary to prominent claims, after controlling for partisanship, demographic characteristics are at best weak predictors of support for reform. We also show that Clinton and Obama did not "lose" blacks, seniors, or wealthy voters over the course of the debate. The small and often nonexistent relationship between these characteristics and support for the plan are constant over time. Instead, the modest fluctuations in support for reform appear to follow the ebb and flow of elite rhetoric. Both mean levels of support and its volatility over time covary with elite partisan discourse. These findings suggest that presidents courting public opinion should seek consensus among their own party's elites before appealing to other narrower interests. PMID:24842971

  12. Public timber supply, market adjustments, and local economies: economic assumptions of the Northwest Forest Plan.

    PubMed

    Power, Thomas Michael

    2006-04-01

    The Northwest Forest Plan in the Pacific Northwest sought to stabilize local economies, including local employment and income, by stabilizing the flow of wood fiber from public forests. This is also a common forest management objective in other regions and countries. Because this economic strategy ignores basic market adjustments, it is likely to fail and to unnecessarily damage forest ecosystems. Application of basic economic principles on how markets operate significantly changes the apparent efficacy of efforts to manage local economies by managing timber supply. The emphasis on timber supply tends to ignore the dominant role that the demand for wood fiber and wood products, rather than wood-fiber supply, plays in determining levels of harvest and production. Contemporary economics indicates that markets tend to operate to offset reductions in wood-fiber supply. This significantly moderates the economic cost of reducing commercial timber harvest in the pursuit of environmental objectives. In addition, contemporary economic analysis indicates that the economic links between natural forests and local communities are much broader than simply the flow of commercially valuable logs to manufacturing facilities. At least in the United States, the flow of environmental services from natural forests has increasingly become an amenity that has drawn people and economic activity to forested areas. Attractive site-specific qualities, including those supported by natural forests, can potentially support local economic development even in the face of reduced timber harvests. These market-related adjustments partially explain the Northwest Forest Plan's overestimation of the expected regional impacts associated with reduced federal timber supply and the ineffectiveness of the plan's efforts to protect communities by stabilizing federal timber supply PMID:16903095

  13. 76 FR 38146 - Revision to the Final Principles of Integrated Resource Planning for Use in Resource Acquisition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ..., 150 East Social Hall Avenue, Suite 300, Salt Lake City, Utah 84111-1580. Comments may also be e-mailed... Administration, 150 East Social Hall Avenue, Suite 300, Salt Lake City, Utah 84111-1580, telephone (801) 524-6383... in the Federal Register on December 6, 1994 (59 FR 62724). A public information and comment forum...

  14. 41 CFR 102-34.80 - Where may we obtain help with our motor vehicle acquisition plans?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 34-MOTOR VEHICLE MANAGEMENT Obtaining Fuel Efficient Motor Vehicles § 102-34.80 Where may we... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Where may we obtain...

  15. 41 CFR 102-34.80 - Where may we obtain help with our motor vehicle acquisition plans?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 34-MOTOR VEHICLE MANAGEMENT Obtaining Fuel Efficient Motor Vehicles § 102-34.80 Where may we... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Where may we obtain...

  16. 41 CFR 102-34.80 - Where may we obtain help with our motor vehicle acquisition plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 34-MOTOR VEHICLE MANAGEMENT Obtaining Fuel Efficient Motor Vehicles § 102-34.80 Where may we... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Where may we obtain...

  17. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    SciTech Connect

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  18. 78 FR 33113 - Publication of the 5-Year Research and Evaluation Strategic Plan Program Years 2012-2017

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ...Notice is hereby given of the publication of the U.S. Department of Labor, Employment and Training Administration's (USDOL/ ETA) 5-Year Research and Evaluation Strategic Plan for 2012-2017. Under Section 171 of the Workforce Investment Act, every 2 years the Secretary of Labor is required to transmit to Congress a strategic plan for pilots, demonstrations, and research over the next 5 years in......

  19. Findings of an evaluation of public involvement programs associated with the development of a Land and Resource Management Plan for the Ouachita National Forest

    SciTech Connect

    Holthoff, M.G.; Howell, R.E.

    1993-08-01

    Federal regulations require the United States Forest Service (USFS) to integrate public input and values into decisions concerning land and resource management planning. The USFS has typically relied on traditional methods of involving the public, whereby public access and input to policy development are unilaterally controlled by the agency. Because of the highly political nature of land and resource management planning, such technocratic forms of public involvement and decision-making appear to be proving ineffective. This paper describes and evaluates two public involvement programs associated with the Ouachita National Forest`s (ONF) lengthy forest planning process. The research consisted of personal interviews with key program leaders and knowledgeable citizen participants, collection of secondary data, and a survey of citizen participants. Because of controversial planning decisions made during an initial planning process, the ONF was forced to re-enter the planning process in order to address unresolved planning issues and to conduct a more effective public involvement program. The supplemental planning process also resulted in a considerable degree of public contention. The survey revealed that although citizen participants were somewhat more satisfied with the supplemental public involvement program relative to the initial program, neither program was viewed as satisfactory. The findings of the study suggest that in order to be more effective, USFS public involvement programs should be more responsive to public concerns and conducted in adherence to principles of collaborative planning.

  20. The Education and Public Outreach Plan for UCLA's Institute for Planets and Exoplanets (iPLEX)

    NASA Astrophysics Data System (ADS)

    Glesener, G. B.; Jewitt, D. C.; Curren, I. S.

    2012-12-01

    Increasing the number and diversity of students pursuing and completing STEM education is a crucial part of UCLA's Institute for Planets and Exoplanets (iPLEX)'s goal of promoting research on planetary systems around the sun and other stars. Cultivating students' interest and success in STEM subject areas from K-12 to the bachelor's degree is an important factor in student retention. As they pursue a bachelor's degree in a STEM major, many become discouraged and decide not to finish with this type of degree; women, underrepresented minorities (URM), and students of low socioeconomic status (SES) have the highest attrition rates (Bayer 2010). Focusing primarily on students at the high school and community college levels, our education and public outreach plan utilizes the multidisciplinary science of astrobiology as a resource for building stronger learning environments in STEM education. By implementing formal education programs that encourage and foster student learning in STEM fields, we intend to (1) increase the efficiency with which students move from high school into STEM-related undergraduate programs, (2) improve the corresponding transfer rate from community colleges to advanced degree programs in STEM at the 4-year university level, and (3) create more opportunities for students to become involved in meaningful research as they progress in their studies. To ensure the success of these programs, we will partner with teachers from local high schools and community colleges, and UCLA's Center X. By being geographically located in Los Angeles County, having one of the highest URM populations in the United States (US Census Bureau, 2007), and partnering with Hampton University (HU) in Virginia, whose student body is 91% African American, we are in a position to make a large impact on diversity. To further ensure the success of our EPO, an independent evaluator will measure and track the following program objectives: increase (1) post-secondary STEM enrollment

  1. Publications

    Cancer.gov

    Information about NCI publications including PDQ cancer information for patients and health professionals, patient-education publications, fact sheets, dictionaries, NCI blogs and newsletters and major reports.

  2. [Marketing as a tool to increase the effectiveness of public health plans. 2008 SESPAS Report].

    PubMed

    Beerli-Palacio, Asunción; Martín-Santana, Josefa D; Porta, Miquel

    2008-04-01

    Recent years have seen a steady increase in social marketing applied to health with the aim of increasing public awareness and changing people's behavior. Programs or actions based on the principles of social marketing have been shown to be effective in improving public health. However, that is not the general rule in Spain, where health policies have been based on health plans directed more to economic efficiency than to citizens' needs. For a health marketing program to be effective, the following factors are necessary: 1) the program has a long-term temporal horizon for action; 2) the objectives are established in terms of behavioral changes; 3) market research is used as a source of information; 4) different actions are established according to the segments identified as targets; 5) the program is operationalized in the four variables of the marketing mix, namely, product, price, distribution and communication, and is not only based on advertising campaigns; 6) the core of the program is exchange, understood as the factors that motivate people to change in return for the promise of something beneficial to them; 7) the factors or forces that compete with the desired behavioral changes are neutralized, and 8) businesses' social responsibility is used as a mechanism to reinforce health improvement programs. The design of health marketing programs should include definition of strategic and operational actions aimed not only at potential adopters of the desired behavior but also at all agents who may help or hinder behavioral change (health professionals, the pharmaceutical industry, politicians, the advertising industry, and products and services with health-challenging objectives). PMID:18405550

  3. A Proposal for Community Involvement in Public School Planning. RR-55.

    ERIC Educational Resources Information Center

    Larson, Elizabeth J. Hunt; Schrankel, Philipp Stephen

    Planning to meet the needs of the future is a critical concern of an Arizona school district. The Mesa Action Planning System (MAPS) provides a framework for community involvement with a 200-member community-based planning committee, selected from constituent groups, and a 12-member steering committee. The planning committee will receive a summary…

  4. NASA Science Institutes Plan. Report of the NASA Science Institutes Team: Final Publication (Incorporating Public Comments and Revisions)

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This NASA Science Institute Plan has been produced in response to direction from the NASA Administrator for the benefit of NASA Senior Management, science enterprise leaders, and Center Directors. It is intended to provide a conceptual framework for organizing and planning the conduct of science in support of NASA's mission through the creation of a limited number of science Institutes. This plan is the product of the NASA Science Institute Planning Integration Team (see Figure A). The team worked intensively over a three-month period to review proposed Institutes and produce findings for NASA senior management. The team's activities included visits to current NASA Institutes and associated Centers, as well as approximately a dozen non-NASA research Institutes. In addition to producing this plan, the team published a "Benchmarks" report. The Benchmarks report provides a basis for comparing NASA's proposed activities with those sponsored by other national science agencies, and identifies best practices to be considered in the establishment of NASA Science Institutes. Throughout the team's activities, a Board of Advisors comprised of senior NASA officials (augmented as necessary with other government employees) provided overall advice and counsel.

  5. 78 FR 31626 - Notice of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ... of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific Advisory... will be hosted by the Office of the U.S. Global AIDS Coordinator, and led by Dr. Amy DuBois, who is the.... The Board serves the Global AIDS Coordinator in a solely advisory capacity concerning...

  6. 78 FR 33144 - Notice of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ... of Public Meeting of the President's Emergency Plan for AIDS Relief (PEPFAR) Scientific Advisory... will be hosted by the Office of the U.S. Global AIDS Coordinator, and led by Dr. Amy DuBois, who is the.... The Board serves the Global AIDS Coordinator in a solely advisory capacity concerning...

  7. 40 CFR 60.1070 - How do I make my draft materials separation plan available to the public?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false How do I make my draft materials separation plan available to the public? 60.1070 Section 60.1070 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Small...

  8. 78 FR 9387 - Notice of Availability for Public Review and Comment: Draft EPA Climate Change Adaptation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-08

    ... AGENCY Notice of Availability for Public Review and Comment: Draft EPA Climate Change Adaptation Plan... programmatic requirements, chief among these protection of human health and the environment. Adaptation will... under changing climatic conditions. Adaptation also necessitates close coordination between EPA and...

  9. The Alabama Public Library Service Library Services and Technology Act Five-Year Plan, October 1, 2002-September 30, 2007.

    ERIC Educational Resources Information Center

    Alabama Public Library Service, Montgomery.

    This document presents the LSTA (Library Services and Technology Act) 2002-2007 plan of the Alabama Public Library Service (APLS). The first section presents the Mission Statement of APLS and lists ways that APLS will meet its mission using federal funds provided by LSTA. The second section: lists the high-priority needs of Alabamians who lack…

  10. Tech notes: Ongoing or planned hydro research, results of recent studies, and reviews of new books, publications, and software

    SciTech Connect

    1993-12-31

    Ongoing or planned hydro research, results of recent studies, and reviews of new books, publications, and software. Items covered this month include: (1) a recommendation that dam designers give more consideration to earthquake resistance, (2) the development of a new wave rotor design, (3) the development of a small hydro database in China, and (4) an ICOLD bulletin on the optimization of constuction costs.

  11. 78 FR 61955 - Columbia Gas Transmission, LLC; Notice of Additional Public Scoping Meetings for the Planned East...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Columbia Gas Transmission, LLC; Notice of Additional Public Scoping Meetings for the Planned East Side Expansion Project and Request for Comments on Environmental Issues The staff of the Federal Energy...

  12. 76 FR 76981 - Request for Public Comments Concerning U.S.-Canada Action Plan for Perimeter Security and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... Facilitation, Economic Growth, and Jobs; Integrated Cross-Border Law Enforcement; and Critical Infrastructure... SECURITY Request for Public Comments Concerning U.S.-Canada Action Plan for Perimeter Security and Economic... allies, vital economic partners, neighbors, and steadfast friends. We share common values,...

  13. Micronutrient Action Plan Instructional Tool (MAPit): A Training Tool to Support Public Health Professionals' Efforts to Eliminate Micronutrient Malnutrition

    ERIC Educational Resources Information Center

    Elbon, Suzanne; Nsubuga, Peter; Knowles, Jacky; Bobrow, Emily; Parvanta, Ibrahim; Timmer, Arnold; van der Haar, Frits

    2006-01-01

    Micronutrient malnutrition (MM) is a global health problem that affects the national socioeconomic stability of an affected country. This article describes a multimedia training tool, the Micronutrient Action Plan instructional tool (MAPit), which has been designed to support public health professionals' efforts to eliminate MM. An overview and…

  14. Comparing Public and Private Institutions That Have and Have Not Implemented Enterprise Resource Planning (ERP) Systems: A Resource Dependence Perspective

    ERIC Educational Resources Information Center

    Sendhil, Geetha R.

    2012-01-01

    The purpose of this national study was to utilize quantitative methods to examine institutional characteristics, financial resource variables, personnel variables, and customer variables of public and private institutions that have and have not implemented enterprise resource planning (ERP) systems, from a resource dependence perspective.…

  15. 76 FR 17471 - Air Tour Management Plan for Haleakala National Park, Maui, HI; Public Meeting/Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... Federal Aviation Administration Air Tour Management Plan for Haleakala National Park, Maui, HI; Public..., Kahului, HI 96732. Wednesday, April 13, 2011, 5 p.m.-7 p.m. Kula Community Center, 3690 Lower Kula Road, Kula, HI 96790. Thursday, April 14, 2011, 5 p.m.-7 p.m. Helene Community Center (Hana), 150 Keawa...

  16. Public Policy Affirmations Affecting the Planning and Implementation of Developmental Services for Children and Adults with HIV Infection.

    ERIC Educational Resources Information Center

    Crocker, Allen C., Comp.; And Others

    The increasing number of individuals infected with symptomatic human immunodeficiency virus (HIV) infection has created a need to examine public policy issues and to further efforts in planning, implementing, and evaluating services for individuals with HIV infection and their families. A working conference was convened, which identified several…

  17. 75 FR 13125 - Pet Spot-On Analysis and Mitigation Plan Available for Public Comment; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... AGENCY Pet Spot-On Analysis and Mitigation Plan Available for Public Comment; Notice of Availability... analysis of the data collected as a result of the Agency's awareness of increasing numbers of incidents... analysis consists of a Technical Review Document and Data Evaluation Records for pet spot-on products....

  18. 26 CFR 301.6104(a)-2 - Public inspection of material relating to pension and other plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 26 Internal Revenue 18 2014-04-01 2014-04-01 false Public inspection of material relating to pension and other plans. 301.6104(a)-2 Section 301.6104(a)-2 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Information and Returns Returns and Records §...

  19. 48 CFR 908.7101-3 - Direct acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Direct acquisition. 908.7101-3 Section 908.7101-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7101-3 Direct acquisition. Vehicles may be acquired by...

  20. Technical and organisational aspects in enterprise resource planning systems implementation: lessons from a Spanish public hospital

    NASA Astrophysics Data System (ADS)

    Escobar-Rodriguez, Tomas; Escobar-Pérez, Bernabe; Monge-Lozano, Pedro

    2014-09-01

    Public resources should always be managed efficiently, more so in times of crisis. Due to the specific characteristics of the healthcare sector, there is a need for special attention, especially in regards to hospitals. Administrators need useful tools to be able to efficiently manage available resources, such as enterprise resource planning (ERP) systems. Therefore, an analysis of the effects of their implementation and use in hospitals is valuable. This study has two purposes. One is to analyse the role ERP systems play in aiding the integration of hospital data, with focus on user satisfaction as well as possible resistance to change. The other purpose is to analyse the effects of implanting and using ERP systems in the hospital environment and identifying how certain variables influence the process, especially the existence of different organisational cultures. Results indicate that clinical information has become notably more integrated, despite the lack of flow in the economic-financial area. The heterogeneous nature of the different groups, clinical (Medical, Nursing) and non-clinical (Economic-Financial, Accounting), had a negative influence on the implementation process, and limited the integration of information as well as the system's performance.

  1. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time...

  2. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time...

  3. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time...

  4. 48 CFR 7.402 - Acquisition methods.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Acquisition methods. 7.402... ACQUISITION PLANNING Equipment Lease or Purchase 7.402 Acquisition methods. (a) Purchase method. (1) Generally, the purchase method is appropriate if the equipment will be used beyond the point in time...

  5. 41 CFR 102-75.515 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for an educational or public health requirement? 102-75.515 Section 102-75.515 Public Contracts and Property Management Federal Property Management...

  6. 41 CFR 102-75.515 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... educational or public health requirement? 102-75.515 Section 102-75.515 Public Contracts and Property... Health Purposes § 102-75.515 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for an educational or public health requirement? When...

  7. 41 CFR 102-75.515 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for an educational or public health requirement? 102-75.515 Section 102-75.515 Public Contracts and Property Management Federal Property Management...

  8. 41 CFR 102-75.515 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... educational or public health requirement? 102-75.515 Section 102-75.515 Public Contracts and Property... Health Purposes § 102-75.515 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for an educational or public health requirement? When...

  9. 41 CFR 102-75.515 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... educational or public health requirement? 102-75.515 Section 102-75.515 Public Contracts and Property... Health Purposes § 102-75.515 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for an educational or public health requirement? When...

  10. Review of Jamaica Public Service Company, Ltd. least-cost expansion plan.

    SciTech Connect

    Koritarov, V.; Buehring, W.; Cirillo, R.; Decision and Information Sciences

    2008-02-28

    Argonne National Laboratory has been asked to review the least-cost expansion plan (LCEP) of the Jamaica Public Service Company, Ltd. (JPSCo). The material that has been initially provided to Argonne included: (1) An electronic copy of the data and results from JPSCo's running the WASP electric system expansion planning model, (2) Approximately 20 pages of a document 'JPSCo Generation Expansion Plan', marked 'DRAFT 002', date unknown, and (3) The report 'JPSCo Least Cost Generation Expansion Plans, (1999-2009)', January 1999. It was noticed that the 20 pages from the 'DRAFT 002' document were different from the January 1999 report. An explanation was provided to Argonne that the excerpt was from an earlier draft and that the review should focus on the January 1999 report. Further, the electronic copy of the WASP case did not correspond to either the January 1999 report or to the 20-page excerpt. Again, the reason for these discrepancies was that the WASP case provided to Argonne was an earlier case and not the final one that was presented in the report. Based on the review of the available material, Argonne experts have prepared and submitted to the National Investment Bank of Jamaica (NIBJ) a preliminary draft report containing the initial findings, comments, questions and observations. As many of the comments and questions raised in the preliminary review needed to be discussed with the appropriate staff of JPSCo and other Jamaican experts, a 3-day mission to Jamaica was carried out by one Argonne expert (V. Koritarov) in the period July 20-23, 1999. Besides JPSCo experts, the discussions and the review of the LCEP during the mission included several experts from NIBJ, Ministry of Energy, and the Petroleum Corporation of Jamaica. Mr. Koritarov also worked with the JPSCo technical staff to reconstruct the WASP base case that was used as a basis for the January 1999 report. The first step was to verify that the results obtained after the resimulation of this case

  11. IFLA General Conference, 1989. Division of Collections and Services. Open Forum of the Division; Section on Acquisition and Exchange; Section on Interlending and Document Delivery; Section on Serial Publications; Section on Rare and Precious Books and Documents. Booklet 50.

    ERIC Educational Resources Information Center

    1989

    There are 20 papers in this collection from the Division of Collections and Services: "IFLA Division of Collections and Services" (Hope E. A. Clement); "Divisional Open Forum Reports" ("Section of Acquisition and Exchange" by Ulrich Montag; "Section of Government Information and Official Publications" by Bernadine Abbott Hoduski; "Section on…

  12. Acquisition and Analysis of Megavoltage Linac Beam Transmission Data for Direct Verification of Photon Spectra Models in a Treatment Planning System

    NASA Astrophysics Data System (ADS)

    Leheta, Dimitra S.

    . While in most cases switching the model spectrum with the measured one did not result in drastic differences in the calculated dose, plans with deviations of 4 to 8% in the maximum dose values for critical structures were discovered. Since spectrum information is used by TPS in evaluation of the scatter dose, the anatomical sites with large scatter contributions are the most vulnerable to inaccuracies in the modeled spectrum. The developed approach of using readily available attenuators and build-up caps in combination with streamlined data processing confirmed feasibility of acquisition of megavoltage linac beam spectra in a typical radiation oncology clinic, offering an independent check of the TPS model.

  13. A Report on Administrative Compensation Planning for St. Paul Public School Personnel.

    ERIC Educational Resources Information Center

    Hooker, Clifford P.; Mueller, Van D.

    This report describes and analyzes various devices and techniques that may be utilized in planning local school administrative compensation. The document outlines broad overall goals for compensation planning, describes and evaluates the application of a compensation plan in the St. Paul schools, and proposes alternative strategies for…

  14. Submittal Requirements for Review of Planning, Bidding and Construction Documents for Georgia Public Schools.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta. Facilities Services Unit.

    This document presents the Georgia Department of Education's submittal requirements for documents addressing the planning and construction of educational facilities. Requirements cover such areas as project funding sources, copies and format, site plan, floor plans, elevations and sections, construction delivery method, and heating, air…

  15. GUIDE FOR EDUCATIONAL PLANNING OF PUBLIC SCHOOL BUILDINGS AND SITES IN MINNESOTA, 1966 EDITION.

    ERIC Educational Resources Information Center

    TOLLERUD, GUY D.

    A DETAILED GUIDE FOR PLANNING SCHOOL BUILDINGS AND SITES IN MINNESOTA. PART ONE DEALS WITH PROCEDURES IN SCHOOL PLANT PLANNING IN TERMS OF STATE AND LOCAL RESPONSIBILITIES. PART TWO DISCUSSES PLANNING AND DEVELOPING OF SCHOOL PLANT FACILITIES IN TERMS OF SCHOOL SITE, ELEMENTARY SCHOOL INSTRUCTIONAL FACILITIES, SECONDARY SCHOOL INSTRUCTIONAL…

  16. An Introduction to Cost-of-Living Adjustments in Public Retirement Plans: Details Matter

    ERIC Educational Resources Information Center

    Jennings, Penelope R.; Jennings, William P.; Phillips, G. Michael

    2016-01-01

    While financial planning students are expected to be able to understand client retirement plans, subtle differences in cost-of-living adjustments can have major impact on the success of client retirement plans. This teaching note compares the cost-of-living adjustments in the largest government sponsored retirement systems and a hypothetical…

  17. Publications.

    ERIC Educational Resources Information Center

    Aviation/Space, 1980

    1980-01-01

    Presents a variety of publications available from government and nongovernment sources. The government publications are from the Federal Aviation Administration (FAA) and the National Aeronautics and Space Administration (NASA) and are designed for educators, students, and the public. (Author/SA)

  18. From plans to actions in patient and public involvement: qualitative study of documented plans and the accounts of researchers and patients sampled from a cohort of clinical trials

    PubMed Central

    Buck, Deborah; Gamble, Carrol; Dudley, Louise; Preston, Jennifer; Hanley, Bec; Williamson, Paula R; Young, Bridget

    2014-01-01

    Patient and public involvement (PPI) in research is increasingly required, although evidence to inform its implementation is limited. Objective Inform the evidence base by describing how plans for PPI were implemented within clinical trials and identifying the challenges and lessons learnt by research teams. Methods We compared PPI plans extracted from clinical trial grant applications (funded by the National Institute for Health Research Health Technology Assessment Programme between 2006 and 2010) with researchers’ and PPI contributors’ interview accounts of PPI implementation. Analysis of PPI plans and transcribed qualitative interviews drew on the Framework technique. Results Of 28 trials, 25 documented plans for PPI in funding applications and half described implementing PPI before applying for funding. Plans varied from minimal to extensive, although almost all anticipated multiple modes of PPI. Interview accounts indicated that PPI plans had been fully implemented in 20/25 trials and even expanded in some. Nevertheless, some researchers described PPI within their trials as tokenistic. Researchers and contributors noted that late or minimal PPI engagement diminished its value. Both groups perceived uncertainty about roles in relation to PPI, and noted contributors’ lack of confidence and difficulties attending meetings. PPI contributors experienced problems in interacting with researchers and understanding technical language. Researchers reported difficulties finding ‘the right’ PPI contributors, and advised caution when involving investigators’ current patients. Conclusions Engaging PPI contributors early and ensuring ongoing clarity about their activities, roles and goals, is crucial to PPI's success. Funders, reviewers and regulators should recognise the value of preapplication PPI and allocate further resources to it. They should also consider whether PPI plans in grant applications match a trial's distinct needs. Monitoring and reporting PPI

  19. 75 FR 32792 - Office of Public Health Support; Division of Planning, Evaluation & Research Native American...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    ... the object of this announcement. Grantees will test the use of a T/CBPR adaptation model to assist... original intervention will be maintained, which will increase efficiency of adaptation. Each grantee's... acquisition or transmission. Conduct pre-implementation phases of assessment, adaptation, tailoring...

  20. 32 CFR 644.7 - Acquisition lines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... HANDBOOK Project Planning Civil Works § 644.7 Acquisition lines. (a) Tentative acquisition lines. As... submission may be for an entire project or by segments or units. However, if the final map is submitted on...

  1. A Plan for Evaluating the District of Columbia's Public Schools: From Impressions to Evidence

    ERIC Educational Resources Information Center

    National Academies Press, 2011

    2011-01-01

    The District of Columbia (DC) has struggled for decades to improve its public education system. In 2007 the DC government made a bold change in the way it governs public education with the goal of shaking up the system and bringing new energy to efforts to improve outcomes for students. The Public Education Reform Amendment Act (PERAA) shifted…

  2. 24 CFR 972.227 - Public and resident consultation process for developing a conversion plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Public and resident consultation... REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONVERSION OF PUBLIC HOUSING TO...

  3. 24 CFR 972.133 - Public and resident consultation process for developing a conversion plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Public and resident consultation... Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONVERSION OF PUBLIC HOUSING TO...

  4. 24 CFR 972.133 - Public and resident consultation process for developing a conversion plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Public and resident consultation... REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONVERSION OF PUBLIC HOUSING TO...

  5. 24 CFR 972.227 - Public and resident consultation process for developing a conversion plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Public and resident consultation... REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONVERSION OF PUBLIC HOUSING TO...

  6. 24 CFR 972.133 - Public and resident consultation process for developing a conversion plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Public and resident consultation... REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONVERSION OF PUBLIC HOUSING TO...

  7. 24 CFR 972.227 - Public and resident consultation process for developing a conversion plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Public and resident consultation... Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONVERSION OF PUBLIC HOUSING TO...

  8. 24 CFR 972.227 - Public and resident consultation process for developing a conversion plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Public and resident consultation... REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONVERSION OF PUBLIC HOUSING TO...

  9. 24 CFR 972.133 - Public and resident consultation process for developing a conversion plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Public and resident consultation... REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT CONVERSION OF PUBLIC HOUSING TO...

  10. 40 CFR 256.60 - Requirements for public participation in State and substate plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., in accord with 40 CFR 25.8, where required by this subpart or by an approved public participation... section; and (4) Prepare and make available to the public a responsiveness summary in accord with 40 CFR... responsiveness summary shall be prepared and made available to the public in accord with 40 CFR 25.8....

  11. Achieving Healthy School Siting and Planning Policies: Understanding Shared Concerns of Environmental Planners, Public Health Professionals, and Educators

    PubMed Central

    Cohen, Alison

    2013-01-01

    Policy decisions regarding the quality of the physical school environment—both, school siting and school facility planning policies—are often considered through the lens of environmental planning, public health, or education policy, but rarely through all three. Environmental planners consider environmental justice issues on a local level and/or consider the regional impact of a school. Public health professionals focus on toxic exposures and populations particularly vulnerable to negative health outcomes. Educators and education policymakers emphasize investing in human capital of both students and staff. By understanding these respective angles and combining these efforts around the common goals of achieving adequacy and excellence, we can work towards a regulatory system for school facilities that recognizes children as a uniquely vulnerable population and seeks to create healthier school environments in which children can learn and adults can work. PMID:20359991

  12. Promoting public health through state cancer control plans: a review of capacity and sustainability.

    PubMed

    Ory, Marcia G; Sanner, Brigid; Vollmer Dahlke, Deborah; Melvin, Cathy L

    2015-01-01

    The Centers for Disease Prevention and Control's National Comprehensive Cancer Control (CCC) Program oversee CCC programs designed to develop and implement CCC plans via CCC coalitions, alliances, or consortia of program stakeholders. We reviewed 40 up-to-date plans for states and the District of Columbia in order to assess how capacity building and sustainability, two evidence-based practices necessary for organizational readiness, positive growth, and maintenance are addressed. We employed an electronic key word search, supplemented by full text reviews of each plan to complete a content analysis of the CCC plans. Capacity is explicitly addressed in just over half of the plans (53%), generally from a conceptual point of view, with few specifics as to how capacity will be developed or enhanced. Roles and responsibilities, timelines for action, and measurements for evaluation of capacity building are infrequently mentioned. Almost all (92%) of the 40 up-to-date plans address sustainability on at least a cursory level, through efforts aimed at funding or seeking funding, policy initiatives, and/or partnership development. However, few details as to how these strategies will be implemented are found in the plans. We present the Texas plan as a case study offering detailed insight into how one plan incorporated capacity building and sustainability into its development and implementation. Training, technical assistance, templates, and tools may help CCC coalition members address capacity and sustainability in future planning efforts and assure the inclusion of capacity building and sustainability approaches in CCC plans at the state, tribal, territorial, and jurisdiction levels. PMID:25853114

  13. Current Literature in Family Planning, November 1972, No. 51.

    ERIC Educational Resources Information Center

    Planned Parenthood--World Population, New York, NY. Katherine Dexter McCormick Library.

    Abstracts of current publications in the fields of population and family planning are contained in this monthly acquisitions list of the Katherine Dexter McCormick Library, Planned Parenthood, New York. Organized in two parts, Part 1 contains an annotated list of the books most recently acquired by the Library, marked with its Library call number,…

  14. Local Heat Stroke Prevention Plans in Japan: Characteristics and Elements for Public Health Adaptation to Climate Change

    PubMed Central

    Martinez, Gerardo Sanchez; Imai, Chisato; Masumo, Kanako

    2011-01-01

    The adverse health effects from hot weather and heat waves represent significant public health risks in vulnerable areas worldwide. Rising temperatures due to climate change are aggravating these risks in a context of fast urbanization, population growth and societal ageing. However, environmental heat-related health effects are largely preventable through adequate preparedness and responses. Public health adaptation to climate change will often require the implementation of heat wave warning systems and targeted preventive activities at different levels. While several national governments have established such systems at the country level, municipalities do not generally play a major role in the prevention of heat disorders. This paper analyzes selected examples of locally operated heat-health prevention plans in Japan. The analysis of these plans highlights their strengths, but also the need of local institutions for assistance to make the transition towards an effective public health management of high temperatures and heat waves. It can also provide useful elements for municipal governments in vulnerable areas, both in planning their climate change and health adaptation activities or to better protect their communities against current health effects from heat. PMID:22408589

  15. 48 CFR 12.504 - Applicability of certain laws to subcontracts for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., Cost Accounting Standards (48 CFR chapter 99) (see 12.214). ... laws to subcontracts for the acquisition of commercial items. 12.504 Section 12.504 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION OF COMMERCIAL...

  16. The Role and Scope of Florida's Public Universities. Planning Guidelines for the State University of Florida.

    ERIC Educational Resources Information Center

    State Univ. System of Florida, Tallahassee.

    Planning guidelines adopted by the Florida Board of Regents for the nine universities in the state system are outlined. Eleven underlying planning assumptions for the universities are presented, including some on the population growth rates, enrollment mix (traditional versus part-time students), demand for doctoral programs or inservice…

  17. 75 FR 67149 - Request for Public Comment on the Draft 2010 National Nanotechnology Initiative Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-01

    ...) Strategic Plan. The draft plan is posted at http://strategy.nano.gov . Comments of approximately one page or... Portal at http://strategy.nano.gov to post their comments (4,000 characters or less) as a response to the... participating in the NNI ( http://www.nano.gov ). The NSET Subcommittee has solicited multiple streams of...

  18. South Dakota Public Higher Education System Opportunities Plan: A Report to the South Dakota Legislature

    ERIC Educational Resources Information Center

    South Dakota Board of Regents, 2006

    2006-01-01

    The South Dakota Opportunities Plan is being presented to the South Dakota Legislature in fulfillment of the Legislature's directive from the 2006 session (House Bill 1238). The plan is intended to provide insight into the critical issues confronting higher education in South Dakota, responses made by the Board of Regents to these situations, and…

  19. 75 FR 62023 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... Commission issued a Notice of proposed rulemaking (75 FR 37884) proposing to amend the transmission planning... proposed rule published June 30, 2010 (75 FR 37884) are due November 12, 2010. ADDRESSES: You may submit... Energy Regulatory Commission 18 CFR Part 35 Transmission Planning and Cost Allocation by...

  20. In-depth interviews with state public health practitioners on the United States National Physical Activity Plan

    PubMed Central

    2013-01-01

    Background The United States National Physical Activity Plan (NPAP; 2010), the country’s first national plan for physical activity, provides strategies to increase population-level physical activity to complement the 2008 physical activity guidelines. This study examined state public health practitioner awareness, dissemination, use, challenges, and recommendations for the NPAP. Methods In 2011–2012, we interviewed 27 state practitioners from 25 states. Interviews were recorded and transcribed verbatim. Transcripts were coded using a standard protocol, verified and reconciled by an independent coder, and input into qualitative software to facilitate development of common themes. Results NPAP awareness was high among state practitioners; dissemination to local constituents varied. Development of state-level strategies and goals was the most frequently reported use of the NPAP. Some respondents noted the usefulness of the NPAP for coalitions and local practitioners. Challenges to the plan included implementation cost, complexity, and consistency with other policies. The most frequent recommendation made was to directly link examples of implementation activities to the plan. Conclusions These results provide early evidence of NPAP dissemination and use, along with challenges encountered and suggestions for future iterations. Public health is one of eight sectors in the NPAP. Further efforts are needed to understand uptake and use by other sectors, as well as to monitor long-term relevance, progress, and collaboration across sectors. PMID:23731829

  1. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Yuen, Joseph H. (Editor)

    1993-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The papers included in this document cover satellite tracking and ground-based navigation, spacecraft-ground communications, and optical communication systems for the Deep Space Network.

  2. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, Edward C. (Editor)

    1991-01-01

    This quarterly publication provides archival reports on developments in programs managed by the Jet Propulsion Laboratory's (JPL's) Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on the activities of the Deep Space Network (DSN) in planning, in supporting research and technology, in implementation, and in operations. Also included is standards activity at JPL for space data, information systems, and reimbursable DSN work performed for other space agencies through NASA.

  3. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Yuen, Joseph H. (Editor)

    1995-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Telecommunications and Mission Operations Directorate (TMOD), which now includes the former Telecommunications and Data Acquisition (TDA) Office. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Communications (OSC).

  4. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Yuen, Joseph H. (Editor)

    1994-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Telecommunications and Mission Operations Directorate (TMOD), which now includes the former Telecommunications and Data Acquisition (TDA) Office. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DS) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Communications (OSC).

  5. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1987-01-01

    Archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. Activities of the Deep Space Network (DSN) in space communications, radio navigation, radio science, and ground-based radio astronomy are reported. Also included are the plans, supporting research and technology, implementation and operations for the Ground Communications Facility (GCF). In geodynamics, the publication reports on the application of radio interferometry at microwave frequencies for geodynamic measurements. In the search for extraterrestrial intelligence (SETI), it reports on implementation and operations for searching the microwave spectrum.

  6. California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning

    SciTech Connect

    Eto, Joseph; Stovall, John P.

    2003-04-01

    The California Energy Commission directed the Consortium for Electric Reliability Technology Solutions to analyze possible future scenarios for the California electricity system and assess transmission research and development (R&D) needs, with special emphasis on prioritizing public-interest R&D needs, using criteria developed by the Energy Commission. The scenarios analyzed in this report are not predictions, nor do they express policy preferences of the project participants or the Energy Commission. The public-interest R&D needs that are identified as a result of the analysis are one input that will be considered by the Energy Commission's Public Interest Energy Research staff in preparing a transmission R&D plan.

  7. Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-12-01

    In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

  8. An examination of electronic file transfer between host and microcomputers for the AMPMODNET/AIMNET (Army Material Plan Modernization Network/Acquisition Information Management Network) classified network environment

    SciTech Connect

    Hake, K.A.

    1990-11-01

    This report presents the results of investigation and testing conducted by Oak Ridge National Laboratory (ORNL) for the Project Manager -- Acquisition Information Management (PM-AIM), and the United States Army Materiel Command Headquarters (HQ-AMC). It concerns the establishment of file transfer capabilities on the Army Materiel Plan Modernization (AMPMOD) classified computer system. The discussion provides a general context for micro-to-mainframe connectivity and focuses specifically upon two possible solutions for file transfer capabilities. The second section of this report contains a statement of the problem to be examined, a brief description of the institutional setting of the investigation, and a concise declaration of purpose. The third section lays a conceptual foundation for micro-to-mainframe connectivity and provides a more detailed description of the AMPMOD computing environment. It gives emphasis to the generalized International Business Machines, Inc. (IBM) standard of connectivity because of the predominance of this vendor in the AMPMOD computing environment. The fourth section discusses two test cases as possible solutions for file transfer. The first solution used is the IBM 3270 Control Program telecommunications and terminal emulation software. A version of this software was available on all the IBM Tempest Personal Computer 3s. The second solution used is Distributed Office Support System host electronic mail software with Personal Services/Personal Computer microcomputer e-mail software running with IBM 3270 Workstation Program for terminal emulation. Test conditions and results are presented for both test cases. The fifth section provides a summary of findings for the two possible solutions tested for AMPMOD file transfer. The report concludes with observations on current AMPMOD understanding of file transfer and includes recommendations for future consideration by the sponsor.

  9. Prevention and control of noncommunicable diseases through evidence-based public health: implementing the NCD 2020 action plan.

    PubMed

    Diem, Günter; Brownson, Ross C; Grabauskas, Vilius; Shatchkute, Aushra; Stachenko, Sylvie

    2016-09-01

    The control of noncommunicable diseases (NCDs) was addressed by the declaration of the 66th United Nations (UN) General Assembly followed by the World Health Organization's (WHO) NCD 2020 action plan. There is a clear need to better apply evidence in public health settings to tackle both behaviour-related factors and the underlying social and economic conditions. This article describes concepts of evidence-based public health (EBPH) and outlines a set of actions that are essential for successful global NCD prevention. The authors describe the importance of knowledge translation with the goal of increasing the effectiveness of public health services, relying on both quantitative and qualitative evidence. In particular, the role of capacity building is highlighted because it is fundamental to progress in controlling NCDs. Important challenges for capacity building include the need to bridge diverse disciplines, build the evidence base across countries and the lack of formal training in public health sciences. As brief case examples, several successful capacity-building efforts are highlighted to address challenges and further evidence-based decision making. The need for a more comprehensive public health approach, addressing social, environmental and cultural conditions, has led to government-wide and society-wide strategies that are now on the agenda due to efforts such as the WHO's NCD 2020 action plan and Health 2020: the European Policy for Health and Wellbeing. These efforts need research to generate evidence in new areas (e.g. equity and sustainability), training to build public health capacity and a continuous process of improvement and knowledge generation and translation. PMID:25758171

  10. Best Laid Plans: The Unfulfilled Promise of Public Higher Education in California

    ERIC Educational Resources Information Center

    Poliakoff, Michael; Alacbay, Armand

    2012-01-01

    Echoing the words and thoughts of Thomas Jefferson, California's state constitution embraces the noblest of principles in its vision for public higher education. Over the decades, California public higher education has dominated policy discussions as a model of access and excellence and a powerful engine of economic growth. Indeed, it would be…

  11. 24 CFR 971.7 - Plan for removal of units from public housing inventories.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... relocation alternatives for households in occupancy, including other public housing and Section 8 tenant... public housing uses; (4) The relocation resources that will be necessary, including a request for any... can be used as relocation housing; (5) A schedule for relocation and removal of units from the...

  12. The 2009 Health Confidence Survey: public opinion on health reform varies; strong support for insurance market reform and public plan option, mixed response to tax cap.

    PubMed

    Fronstin, Paul; Helman, Ruth

    2009-07-01

    PUBLIC SUPPORT FOR HEALTH REFORM: Findings from the 2009 Health Confidence Survey--the 12th annual HCS--indicate that Americans have already formed strong opinions regarding various aspects of health reform, even before details have been released regarding various key factors. These issues include health insurance market reform, the availability of a public plan option, mandates on employers and individuals, subsidized coverage for the low-income population, changes to the tax treatment of job-based health benefits, and regulatory oversight of health care. These opinions may change as details surface, especially as they concern financing options. In the absence of such details, the 2009 HCS finds generally strong support for the concepts of health reform options that are currently on the table. U.S. HEALTH SYSTEM GETS POOR MARKS, BUT SO DOES A MAJOR OVERHAUL: A majority rate the nation's health care system as fair (30 percent) or poor (29 percent). Only a small minority rate it excellent (6 percent) or very good (10 percent). While 14 percent of Americans think the health care system needs a major overhaul, 51 percent agree with the statement "there are some good things about our health care system, but major changes are needed." NATIONAL HEALTH PLAN ELEMENTS RATED HIGHLY: Between 68 percent and 88 percent of Americans either strongly or somewhat support health reform ideas such as national health plans, a public plan option, guaranteed issue, expansion of Medicare and Medicaid, and employer and individual mandates. MIXED REACTION TO HEALTH BENEFITS TAX CAP: Reaction to capping the current tax exclusion of employment-based health benefits is mixed. Nearly one-half of Americans (47 percent) would switch to a lower-cost plan if the tax exclusion were capped, 38 percent would stay on their current plan and pay the additional taxes, and 9 percent don't know. CONTINUED FAITH IN EMPLOYMENT-BASED BENEFITS, BUT DOUBTS ON AFFORDABILITY: Individuals with employment

  13. Educational Computing in the Andover Public Schools.

    ERIC Educational Resources Information Center

    Mitsakos, Charles L.

    A rationale for computers in education in the Andover (Massachusetts) public schools, a curricular scope and sequence, a computer acquisitions plan, and a staff development summary are presented. The report is a result of an 18-month study of computers in education; pilot programs in the schools; and input from specialists in business, education,…

  14. SNAP: Simulating New Acquisition Processes

    NASA Technical Reports Server (NTRS)

    Alfeld, Louis E.

    1997-01-01

    Simulation models of acquisition processes range in scope from isolated applications to the 'Big Picture' captured by SNAP technology. SNAP integrates a family of models to portray the full scope of acquisition planning and management activities, including budgeting, scheduling, testing and risk analysis. SNAP replicates the dynamic management processes that underlie design, production and life-cycle support. SNAP provides the unique 'Big Picture' capability needed to simulate the entire acquisition process and explore the 'what-if' tradeoffs and consequences of alternative policies and decisions. Comparison of cost, schedule and performance tradeoffs help managers choose the lowest-risk, highest payoff at each step in the acquisition process.

  15. The 2009 National Environmental Public Health Conference: one model for planning green and healthy conferences.

    PubMed

    Ruckart, Perri Zeitz; Moore, Cory; Burgin, Deborah; Byrne, Maggie Kelly

    2011-01-01

    The Centers for Disease Control and Prevention's National Center for Environmental Health and the Agency for Toxic Substances and Disease Registry committed to making their 2009 National Environmental Public Health Conference a model for green and healthy conferences. The conference included increased opportunities for physical activity, both as part of conference events and for transportation to the conference. In addition, conference meals were healthy and sustainably sourced. The conference also implemented intuitive, accessible recycling; online scheduling and evaluation to minimize hard-copy materials; and the purchase of carbon offsets to reduce the unwanted environmental impact of the conference. Public health professionals have an opportunity and obligation to support healthy behaviors at their events and to serve as leaders in this area. Facilitating healthy and sustainable choices is in alignment with goals for both public health and broader social issues-such as environmental quality-that have a direct bearing on public health. PMID:21563713

  16. National plan for siting high-level radioactive waste repositories and environmental assessment: Public draft

    NASA Astrophysics Data System (ADS)

    1982-02-01

    The process used to find sites suitable for disposal of high level radioactive waste is described. Existing and planned activities for screening successively smaller portions of land to identify suitable candidate sites, and for subsequently selecting one or more of these sites for permanent disposal of radioactive wastes are discussed. Environmental effects of the proposed action, including the anticipate range of field studies to characterize various land areas and reasonable alternative siting strategies, are assessed. The environmental assessment provides the basis for a finding of whether or not implementation of this plan will result in significant environmental impacts.

  17. The golden goose in the crosshairs: the transition to defined contribution pension plans in the public sector: unintended consequences.

    PubMed

    Johnson, Brian R

    2013-01-01

    State, county, and local governments are currently facing a myriad of economic issues, based on shrinking tax revenues combined with increased expenditures. Of these, the costs related to defined benefit pension plans are one of the most serious issues facing many public employers. Through a comprehensive review of the existing literature, this article examines how the shift from the defined benefit (DB) to defined contribution (DC) pension plan has the potential to enhance levels of labor unrest due to changes in union militancy, bargaining skills deficits, intra-organizational conflict, and issues related to economic trade-offs. Besides the capacity for immediate and deleterious ramifications in the collective bargaining process, the transition to the DC pension also presents some potentially negative consequences related to human resource management, including changes in the psychological contract, recruitment strategies, employee turnover, and changes in retirement patterns. Recommendations to improve labor relations and human resource management practices in the DC pension environment are also explored. PMID:23484365

  18. Can the right to health inform public health planning in developing countries? A case study for maternal healthcare from Indonesia

    PubMed Central

    D'Ambruoso, Lucia; Byass, Peter; Nurul Qomariyah, Siti

    2008-01-01

    Background Maternal mortality remains unacceptably high in developing countries despite international advocacy, development targets, and simple, affordable and effective interventions. In recent years, regard for maternal mortality as a human rights issue as well as one that pertains to health, has emerged. Objective We study a case of maternal death using a theoretical framework derived from the right to health to examine access to and quality of maternal healthcare. Our objective was to explore the potential of rights-based frameworks to inform public health planning from a human rights perspective. Design Information was elicited as part of a verbal autopsy survey investigating maternal deaths in rural settings in Indonesia. The deceased's relatives were interviewed to collect information on medical signs, symptoms and the social, cultural and health systems circumstances surrounding the death. Results In this case, a prolonged, severe fever and a complicated series of referrals culminated in the death of a 19-year-old primagravida at 7 months gestation. The cause of death was acute infection. The woman encountered a range of barriers to access; behavioural, socio-cultural, geographic and economic. Several serious health system failures were also apparent. The theoretical framework derived from the right to health identified that none of the essential elements of the right were upheld. Conclusion The rights-based approach could identify how and where to improve services. However, there are fundamental and inherent conflicts between the public health tradition (collective and preventative) and the right to health (individualistic and curative). As a result, and in practice, the right to health is likely to be ineffective for public health planning from a human rights perspective. Collective rights such as the right to development may provide a more suitable means to achieve equity and social justice in health planning. PMID:20027244

  19. [Review As You Go: Oklahoma City Public Schools' Plan Using Saxon's Procedures.

    ERIC Educational Resources Information Center

    Hartzler, Stan

    This document consists of three related items. The first brief paper describes the components of a cumulative daily review program and its origins, rationale, and outcomes. The review-as-you-go (RAYG) format entails planning cumulative examinations and providing review problems each day. The procedure once was routinely used; today it is…

  20. Current Status and Future Plans for Undergraduate Public/Community Health Education Program Accreditation

    ERIC Educational Resources Information Center

    Miller, M. Elizabeth; Birch, David A.; Cottrell, Randall R.

    2010-01-01

    Background: Quality assurance in health education professional preparation has long been a goal of the profession. A comprehensive coordinated accreditation process for graduate and undergraduate health education has been recommended. Purpose: The purpose of this study was to determine the current status of, and future plans for,…

  1. 77 FR 32183 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ...The Federal Energy Regulatory Commission affirms its basic determinations in Order No. 1000, amending the transmission planning and cost allocation requirements established in Order No. 890 to ensure that Commission-jurisdictional services are provided at just and reasonable rates and on a basis that is just and reasonable and not unduly discriminatory or preferential. This order affirms the......

  2. A Guide for Planning and Construction of Public School Facilities in Georgia. School Food Service Facilities.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta. Office of School Administrative Services.

    It is the purpose of this guide to provide established, well-tested guidelines for planning and constructing food service facilities. These guidelines attempt to get the most efficient and economical operation from a school's food service facilities by providing pertinent information for expanding and remodeling existing facilities, as well as…

  3. Annual Report on Our Call to Action: Strategic Plan for the Montgomery County Public Schools

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2004

    2004-01-01

    In June 2003 the Board of Education adopted "Our Call to Action, Pursuit of Excellence," the second edition of the school system's strategic plan. This update of the original November 1999 Our Call to Action, while remaining focused on the core mission of providing every student with a high-quality, world-class education, strengthened the…

  4. Determining Your Public Library's Future Size: A Needs Assessment and Planning Model.

    ERIC Educational Resources Information Center

    Brawner, Lee B.; Beck, Donald K., Jr.

    This book guides library administrators through stages of long-range needs assessment, particularly taking what they know about their user community, library services, performance standards, and anticipated resources, and using that knowledge to determine space and building needs. Tips, explanations, and hands-on planning tools come through…

  5. New Publications for Planning Libraries (List No. 9: Land Use). Exchange Bibliography 828.

    ERIC Educational Resources Information Center

    Vance, Mary, Comp.

    One hundred and fourteen entries comprise this general bibliography on land use, zoning, city planning, and the relationship on the environment. Most of the sources date from 1973 through 1975. The bulk of the documents are commercially published books, research reports, and studies. Citations are alphabetized by author and include the title index…

  6. Model Bloodborne Pathogens: Exposure Control Plan for Wisconsin Public Schools. Bulletin No. 93311.

    ERIC Educational Resources Information Center

    Wisconsin State Dept. of Public Instruction, Madison.

    This document is intended to assist local school districts in complying with the Wisconsin Department of Industry, Labor and Human Relations (DILHR) Health and Safety Standard. Following an overview of the plan, the guide is organized into six chapters: (1) "Exposure Determination" discusses job classifications, tasks, and procedures; (2) "Methods…

  7. SRDC Plan of Work: Southern States' Title V Programs, 1978. SRDC Series Publication No. 24.

    ERIC Educational Resources Information Center

    Southern Rural Development Center, State College, MS.

    Moving rural development program and research information to users summarizes the Southern Rural Development Center (SRDC) Plan of Work for 1978. One of 4 regional centers set up by the 1972 Rural Development Act, SRDC coordinates cooperation between research and extension at 28 land-grant institutions in 13 states and Puerto Rico which have rural…

  8. Guide for Educational Planning of Public School Buildings and Sites in Minnesota. Revised.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Administration, St. Paul. Documents Section.

    This guide serves as a manual for Minnesota school boards, administrators, architects, engineers, and others engaged in developing school plant programs. Part I considers State and local responsibilities in school plant planning procedures; Part II deals with site selection and the requirements for elementary, secondary, service, central, and…

  9. A Comprehensive Master Plan for Computer Utilization in Public School Districts.

    ERIC Educational Resources Information Center

    Splittgerber, Fredric L.; Stirzaker, Norbert A.

    1984-01-01

    Discusses advantages of a centralized school district plan for computer utilization at building, district, and state-federal level, and reviews categories of information required for computer applications--staff personnel, accounting, pupil records, classroom/instruction, and administrative support services--by outlining each category to indicate…

  10. North Carolina Public Schools Facility Standards. A Guide for Planning School Facilities.

    ERIC Educational Resources Information Center

    Knott, Gerald H.; Lora, James M.; Acker, Marjorie L.; Taynton, Steven; Logan, Gladys B.; Harrell, Ronald C.

    The State of North Carolina has developed a planning guide for those in the process of building, enlarging, or renovating school facilities. This guide defines and describes the educational spaces needed to support a modern, comprehensive educational program and sets minimal standards for the types and sizes of spaces required. It serves as a…

  11. Infopowering the Commonwealth. Virginia's Public Libraries: Electronic Resource Libraries for 21st Century Information. A Strategic Technology Plan for Public Libraries to the Joint Commission on Science and Technology.

    ERIC Educational Resources Information Center

    Virginia State Library, Richmond.

    This strategic technology plan for Virginia's public libraries presents current findings, recommendations, and the steps required to achieve universal access to electronic information. Introductory material includes lists of members of the Library of Virginia Board and Technology Plan Committee, an executive summary, and vision statement. The…

  12. Public Presentations of Professional Change in Academic Research Library Strategic Plans

    ERIC Educational Resources Information Center

    Bracke, Paul J.

    2012-01-01

    Academic librarianship is a profession in the midst of change. Embedded within multiple social spheres, academic librarians are adapting to changes in higher education, the sociotechnical environment of information, and the system of professions. This research investigates the ways in which academic librarians publicly present the ways in which…

  13. 76 FR 17471 - Air Tour Management Plan Environmental Assessment for Mount Rainier National Park, WA; Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... Marin, National Park Service, Natural Resource Program Center, Natural Sounds and Night Skies Division... National Park, WA; Public Meeting/Notice of Availability, Review, and Comment on Draft Alternatives AGENCY... alternatives and announces meetings hosted by the National Park Service, Mount Rainier National Park, and...

  14. 77 FR 74129 - Approval and Promulgation of Implementation Plans; Texas; Public Participation for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... public participation was necessary to maintain air quality as required by the CAA. See 60 FR 45530, at 45548 (citing 38 FR 15834, 15836 (1973) and NRDC v. EPA, No. 72-1522 (D.C. Cir.)). See also See 61 FR... 18, 2002 (67 FR 58697), effective October 18, 2002. EPA SIP-approved the submitted Sections...

  15. The Rise of Childhood Poverty in Georgia: Implications for Public School Planning and Pedagogy

    ERIC Educational Resources Information Center

    Boggs, Olivia M.

    2011-01-01

    The rapid and steady growth of poverty in Georgia's public schools is a clarion call to re-examine the extent to which educators are reaching and teaching all students, regardless of their economic standing. The traditional view of poverty as a marginal condition affecting a minority of students no longer holds as 56% of Georgia's 1.6-million…

  16. 75 FR 43528 - Seeking Public Comment on Draft National Health Security Strategy Biennial Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... . SUPPLEMENTARY INFORMATION: The National Health Security Strategy (2009) can be found at: http://www.phe.gov... HUMAN SERVICES Office of the Secretary Seeking Public Comment on Draft National Health Security Strategy... achieve national health security and to implement the first quadrennial National Health Security...

  17. Interviewing Key Informants: Strategic Planning for a Global Public Health Management Program

    ERIC Educational Resources Information Center

    Kun, Karen E.; Kassim, Anisa; Howze, Elizabeth; MacDonald, Goldie

    2013-01-01

    The Centers for Disease Control and Prevention's Sustainable Management Development Program (SMDP) partners with low- and middle-resource countries to develop management capacity so that effective global public health programs can be implemented and better health outcomes can be achieved. The program's impact however, was variable. Hence, there…

  18. The Ethics of Pandering in Boston Public Schools' School Assignment Plan

    ERIC Educational Resources Information Center

    Levinson, Meira

    2015-01-01

    How can access to public elementary schools of variable quality be justly distributed within a school district? Two reasonable criteria are: (a) that children should have equal opportunity to attend high-quality schools, and (b) school assignment policies should foster an overall increase in the number of high-quality schools. This article…

  19. Pre-Production Planning for Public Service Announcements: A Case Study.

    ERIC Educational Resources Information Center

    Johnson, Mark

    To investigate the factors behind the overall lack of success of televised public service announcements (PSAs), five Marine recruitment PSAs were studied using 138 college undergraduate students (75% male and 90% freshmen and sophomores). Results indicated the following: in general, the PSA messages were perceived as alienating by the students;…

  20. 76 FR 11426 - Gulf Spill Restoration Planning; Public Scoping Meetings for the Programmatic Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... Scoping Meetings for the Programmatic Environmental Impact Statement for the Deepwater Horizon Oil Spill...) for the Deepwater Horizon Oil Spill that began on April 20, 2010, Mississippi Canyon Block 252 (``the Oil Spill''). The notice announced NOAA's intent to hold public scoping meetings in eleven...