Sample records for acquisition projects performance

  1. Optimized image acquisition for breast tomosynthesis in projection and reconstruction space.

    PubMed

    Chawla, Amarpreet S; Lo, Joseph Y; Baker, Jay A; Samei, Ehsan

    2009-11-01

    Breast tomosynthesis has been an exciting new development in the field of breast imaging. While the diagnostic improvement via tomosynthesis is notable, the full potential of tomosynthesis has not yet been realized. This may be attributed to the dependency of the diagnostic quality of tomosynthesis on multiple variables, each of which needs to be optimized. Those include dose, number of angular projections, and the total angular span of those projections. In this study, the authors investigated the effects of these acquisition parameters on the overall diagnostic image quality of breast tomosynthesis in both the projection and reconstruction space. Five mastectomy specimens were imaged using a prototype tomosynthesis system. 25 angular projections of each specimen were acquired at 6.2 times typical single-view clinical dose level. Images at lower dose levels were then simulated using a noise modification routine. Each projection image was supplemented with 84 simulated 3 mm 3D lesions embedded at the center of 84 nonoverlapping ROIs. The projection images were then reconstructed using a filtered backprojection algorithm at different combinations of acquisition parameters to investigate which of the many possible combinations maximizes the performance. Performance was evaluated in terms of a Laguerre-Gauss channelized Hotelling observer model-based measure of lesion detectability. The analysis was also performed without reconstruction by combining the model results from projection images using Bayesian decision fusion algorithm. The effect of acquisition parameters on projection images and reconstructed slices were then compared to derive an optimization rule for tomosynthesis. The results indicated that projection images yield comparable but higher performance than reconstructed images. Both modes, however, offered similar trends: Performance improved with an increase in the total acquisition dose level and the angular span. Using a constant dose level and angular span, the performance rolled off beyond a certain number of projections, indicating that simply increasing the number of projections in tomosynthesis may not necessarily improve its performance. The best performance for both projection images and tomosynthesis slices was obtained for 15-17 projections spanning an angular are of approximately 45 degrees--the maximum tested in our study, and for an acquisition dose equal to single-view mammography. The optimization framework developed in this framework is applicable to other reconstruction techniques and other multiprojection systems.

  2. 48 CFR 307.104-70 - Acquisition strategy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Enterprise Performance Life Cycle concept phase. .... Program and Project Managers responsible for major IT capital investments (and for any other investments... ASFR/OGAPA/DA Internet Web site. Program and Project Managers must initiate the acquisition strategy...

  3. Data acquisition instruments: Psychopharmacology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hartley, D.S. III

    This report contains the results of a Direct Assistance Project performed by Lockheed Martin Energy Systems, Inc., for Dr. K. O. Jobson. The purpose of the project was to perform preliminary analysis of the data acquisition instruments used in the field of psychiatry, with the goal of identifying commonalities of data and strategies for handling and using the data in the most advantageous fashion. Data acquisition instruments from 12 sources were provided by Dr. Jobson. Several commonalities were identified and a potentially useful data strategy is reported here. Analysis of the information collected for utility in performing diagnoses is recommended.more » In addition, further work is recommended to refine the commonalities into a directly useful computer systems structure.« less

  4. 48 CFR 242.7400 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false General. 242.7400 Section 242.7400 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF... representative is a representative of a DoD program, project, or system office performing non-CAS technical...

  5. Colville Confederated Tribes' Performance Project Wildlife Mitigation Acquisitions, Annual Report 2006.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitney, Richard; Berger, Matthew; Tonasket, Patrick

    2006-12-01

    The Colville Confederated Tribes Wildlife Mitigation Project is protecting lands as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. The Mitigation Project protects and manages 54,606 acres for the biological requirements of managed wildlife species that are important to the Colville Tribes. With the inclusion of 2006 acquisitions, the Colville Tribes have acquired approximately 32,018 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. This annual report for 2006 briefly describes that four priority land acquisitions that were considered for enrollment into the Colvillemore » Tribes Mitigation Project during the 2006 contract period.« less

  6. Prediction Markets for Defense Acquisition: The Devil is in the Details

    DTIC Science & Technology

    2010-05-01

    1 Bill Gates, Pete Coughlan, Noah Myung, Jeremy Arkes Professors of Economics Naval Postgraduate School Prediction Markets for Defense Acquisition...Acquisition: The Devil is in the Details 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e...TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) Naval Postgraduate School,Monterey,CA,93943 8. PERFORMING

  7. 48 CFR 232.1004 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 232.1004 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Performance-Based Payments 232.1004..., completion criteria and event values along with the projected expenditure profile in order to negotiate the...

  8. Development of decision-making support tools for early right-of-way acquisitions.

    DOT National Transportation Integrated Search

    2010-01-01

    This report documents the work performed during phase two of Project 0-5534, Asset Management Texas : Style. This phase included gathering historical Texas Department of Transportation (TxDOT) right-of-way : acquisition information, analyzi...

  9. 48 CFR 1553.209-71 - EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Officer's Evaluation of Contractor Performance. 1553.209-71 Section 1553.209-71 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209-71 EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance. As prescribed in 1509.170-4...

  10. Percutaneous Vertebroplasty: Preliminary Experiences with Rotational Acquisitions and 3D Reconstructions for Therapy Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hodek-Wuerz, Roman; Martin, Jean-Baptiste; Wilhelm, Kai

    Percutaneous vertebroplasty (PVP) is carried out under fluoroscopic control in most centers. The exclusion of implant leakage and the assessment of implant distribution might be difficult to assess based on two-dimensional radiographic projection images only. We evaluated the feasibility of performing a follow-up examination after PVP with rotational acquisitions and volumetric reconstructions in the angio suite. Twenty consecutive patients underwent standard PVP procedures under fluoroscopic control. Immediate postprocedure evaluation of the implant distribution in the angio suite (BV 3000; Philips, The Netherlands) was performed using rotational acquisitions (typical parameters for the image acquisition included a 17-cm field-of-view, 200 acquired imagesmore » for a total angular range of 180{sup o}). Postprocessing of acquired volumetric datasets included multiplanar reconstruction (MPR), maximum intensity projection (MIP), and volume rendering technique (VRT) images that were displayed as two-dimensional slabs or as entire three-dimensional volumes. Image evaluation included lesion and implant assessment with special attention given to implant leakage. Findings from rotational acquisitions were compared to findings from postinterventional CT. The time to perform and to postprocess the rotational acquisitions was in all cases less then 10 min. Assessment of implant distribution after PVP using rotational image acquisition methods and volumetric reconstructions was possible in all patients. Cement distribution and potential leakage sites were visualized best on MIP images presented as slabs. From a total of 33 detected leakages with CT, 30 could be correctly detected by rotational image acquisition. Rotational image acquisitions and volumetric reconstruction methods provided a fast method to control radiographically the result of PVP in our cases.« less

  11. TRAMP; The next generation data acquisition for RTP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    van Haren, P.C.; Wijnoltz, F.

    1992-04-01

    The Rijnhuizen Tokamak Project RTP is a medium-sized tokamak experiment, which requires a very reliable data-acquisition system, due to its pulsed nature. Analyzing the limitations of an existing CAMAC-based data-acquisition system showed, that substantial increase of performance and flexibility could best be obtained by the construction of an entirely new system. This paper discusses this system, CALLED TRAMP (Transient Recorder and Amoeba Multi Processor), based on tailor-made transient recorders with a multiprocessor computer system in VME running Amoeba. The performance of TRAMP exceeds the performance of the CAMAC system by a factor of four. The plans to increase the flexibilitymore » and for a further increase of performance are presented.« less

  12. ISS Efforts to Fully Utilize its Target Acquisition Capability Serves as an Analog for Future Laser Pointing Communications Systems

    NASA Technical Reports Server (NTRS)

    Jackson, Dan

    2017-01-01

    The ISS is an outstanding platform for developing, testing and refining laser communications systems for future exploration. A recent ISS project which improved ISS communications satellite acquisition performance proves the platform’s utility as a laser communications systems testbed.

  13. Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2011-03-18

    NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,Library Of Congress,101...Deepwater Acquisition into asset-based Acquisition Program Baselines, the proposed changes align projects that were formerly grouped under...Integrated Coast Guard Systems (ICGS)—an industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite

  14. Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2011-04-14

    NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,The Library of Congress...disaggregation of the Deepwater Acquisition into asset-based Acquisition Program Baselines, the proposed changes align projects that were formerly grouped...industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite delivery, indefinite quantity (ID/IQ

  15. A spectral X-ray CT simulation study for quantitative determination of iron

    NASA Astrophysics Data System (ADS)

    Su, Ting; Kaftandjian, Valérie; Duvauchelle, Philippe; Zhu, Yuemin

    2018-06-01

    Iron is an essential element in the human body and disorders in iron such as iron deficiency or overload can cause serious diseases. This paper aims to explore the ability of spectral X-ray CT to quantitatively separate iron from calcium and potassium and to investigate the influence of different acquisition parameters on material decomposition performance. We simulated spectral X-ray CT imaging of a PMMA phantom filled with iron, calcium, and potassium solutions at various concentrations (15-200 mg/cc). Different acquisition parameters were considered, such as the number of energy bins (6, 10, 15, 20, 30, 60) and exposure factor per projection (0.025, 0.1, 1, 10, 100 mA s). Based on the simulation data, we investigated the performance of two regularized material decomposition approaches: projection domain method and image domain method. It was found that the former method discriminated iron from calcium, potassium and water in all cases and tended to benefit from lower number of energy bins for lower exposure factor acquisition. The latter method succeeded in iron determination only when the number of energy bins equals 60, and in this case, the contrast-to-noise ratios of the decomposed iron images are higher than those obtained using the projection domain method. The results demonstrate that both methods are able to discriminate and quantify iron from calcium, potassium and water under certain conditions. Their performances vary with the acquisition parameters of spectral CT. One can use one method or the other to benefit better performance according to the data available.

  16. The dorsal tegmental noradrenergic projection: an analysis of its role in maze learning.

    PubMed

    Roberts, D C; Price, M T; Fibiger, H C

    1976-04-01

    The hypothesis that the noradrenergic projection from the locus coeruleus (LC) to the cerebral cortex and hippocampus is an important neural substrate for learning was evaluated. Maze performance was studied in rats receiving either electrolytic lesions of LC or 6-hydroxydopamine (6-OHDA) lesions of the dorsal tegmental noradrenergic projection. The LC lesions did not disrupt the acquisition of a running response for food reinforcement in an L-shaped runway, even though hippocampal-cortical norepinephrine (NE) was reduced to 29%. Greater telencephalic NE depletions (to 6% of control levels) produced by 6-OHDA also failed to disrupt the acquisition of this behavior or to impair the acquisition of a food-reinforced position habit in a T-maze. Neither locomotor activity nor habituation to a novel environment was affected by the 6-OHDA lesions. Rats with such lesions were, however, found to be significantly more distractible than were controls during the performance of a previously trained response. The hypothesis that telencephalic NE is of fundamental importance in learning was not supported. The data suggest that this system may participate in attentional mechanisms.

  17. Quality improvement in childhood obesity management through the maintenance of certification process.

    PubMed

    Huang, Jeannie S; Chun, Stanford; Sandhu, Amanpreet; Terrones, Laura

    2013-11-01

    To assess the Health and Obesity: Prevention and Education (HOPE) Curriculum Project, a web-based clinician education program that promotes appropriate screening, prevention, and management of weight among youth by pediatric practitioners, based on the 2007 Expert Committee recommendations. The project currently provides Maintenance of Certification (MOC) Part 4 credit through the American Board of Pediatrics. Participants identified themselves to the HOPE MOC Part 4 program. Enrollees were required to complete all continuing medical education modules (10.5 hours). Knowledge acquisition and self-reported confidence levels related to screening, prevention, and management practices of pediatric obesity were measured using preknowledge and postknowledge questionnaires. Participants were also required to perform a quality improvement project and submit practice performance data from repeated medical chart reviews over time. Knowledge acquisition, self-efficacy, and practice performance data were analyzed using repeated-measures analyses. The 51 participants demonstrated significant improvements in knowledge acquisition and self-efficacy scores after viewing individual modules. In addition, participants demonstrated significant improvements in measured clinical compliance with recommended practices over time. Participation in the HOPE MOC Part 4 program appeared to improve knowledge acquisition, self-efficacy, and physician compliance with recommended practice recommendations for the screening, prevention, and management of pediatric obesity. Further data are required to determine whether such practice-based improvements translate into actual reduction in patient weight and/or reduction in health-related costs related to overweight and obesity in youth. Copyright © 2013 Mosby, Inc. All rights reserved.

  18. Comparison of detectability in step-and-shoot mode and continuous mode digital tomosynthesis systems

    NASA Astrophysics Data System (ADS)

    Lee, Changwoo; Han, Minah; Baek, Jongduk

    2017-03-01

    Digital tomosynthesis system has been widely used in chest, dental, and breast imaging. Since the digital tomosynthesis system provides volumetric images from multiple projection data, structural noise inherent in X-ray radiograph can be reduced, and thus signal detection performance is improved. Currently, tomosynthesis system uses two data acquisition modes: step-and-shoot mode and continuous mode. Several studies have been conducted to compare the system performance of two acquisition modes with respect to spatial resolution and contrast. In this work, we focus on signal detectability in step-and-shoot mode and continuous mode. For evaluation, uniform background is considered, and eight spherical objects with diameters of 0.5, 0.8, 1, 2, 3, 5, 8, 10 mm are used as signals. Projection data with and without spherical objects are acquired in step-and-shoot mode and continuous mode, respectively, and quantum noise are added. Then, noisy projection data are reconstructed by FDK algorithm. To compare the detection performance of two acquisition modes, we calculate task signal-to-noise ratio (SNR) of channelized Hotelling observer with Laguerre-Gauss channels for each spherical object. While the task-SNR values of two acquisition modes are similar for spherical objects larger than 1 mm diameter, step-and-shoot mode yields higher detectability for small signal sizes. The main reason of this behavior is that small signal is more affected by X-ray tube motion blur than large signal. Our results indicate that it is beneficial to use step-and-shoot data acquisition mode to improve the detectability of small signals (i.e., less than 1 mm diameter) in digital tomosynthesis systems.

  19. An Evolving Joint Acquisition Force

    DTIC Science & Technology

    2004-03-19

    COVERED - 4. TITLE AND SUBTITLE An Evolving Joint Acquisition Force 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ...Theodore Jennings 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) U.S. Army War...College,Carlisle Barracks,Carlisle,PA,17013-5050 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10

  20. Real-time acquisition and display of flow contrast using speckle variance optical coherence tomography in a graphics processing unit.

    PubMed

    Xu, Jing; Wong, Kevin; Jian, Yifan; Sarunic, Marinko V

    2014-02-01

    In this report, we describe a graphics processing unit (GPU)-accelerated processing platform for real-time acquisition and display of flow contrast images with Fourier domain optical coherence tomography (FDOCT) in mouse and human eyes in vivo. Motion contrast from blood flow is processed using the speckle variance OCT (svOCT) technique, which relies on the acquisition of multiple B-scan frames at the same location and tracking the change of the speckle pattern. Real-time mouse and human retinal imaging using two different custom-built OCT systems with processing and display performed on GPU are presented with an in-depth analysis of performance metrics. The display output included structural OCT data, en face projections of the intensity data, and the svOCT en face projections of retinal microvasculature; these results compare projections with and without speckle variance in the different retinal layers to reveal significant contrast improvements. As a demonstration, videos of real-time svOCT for in vivo human and mouse retinal imaging are included in our results. The capability of performing real-time svOCT imaging of the retinal vasculature may be a useful tool in a clinical environment for monitoring disease-related pathological changes in the microcirculation such as diabetic retinopathy.

  1. Feasibility of intra-acquisition motion correction for 4D DSA reconstruction for applications in the thorax and abdomen

    NASA Astrophysics Data System (ADS)

    Wagner, Martin; Laeseke, Paul; Harari, Colin; Schafer, Sebastian; Speidel, Michael; Mistretta, Charles

    2018-03-01

    The recently proposed 4D DSA technique enables reconstruction of time resolved 3D volumes from two C-arm CT acquisitions. This provides information on the blood flow in neurovascular applications and can be used for the diagnosis and treatment of vascular diseases. For applications in the thorax and abdomen, respiratory motion can prevent successful 4D DSA reconstruction and cause severe artifacts. The purpose of this work is to propose a novel technique for motion compensated 4D DSA reconstruction to enable applications in the thorax and abdomen. The approach uses deformable 2D registration to align the projection images of a non-contrast and a contrast enhanced scan. A subset of projection images is then selected, which are acquired in a similar respiratory state and an iterative simultaneous multiplicative algebraic reconstruction is applied to determine a 3D constraint volume. A 2D-3D registration step then aligns the remaining projection images with the 3D constraint volume. Finally, a constrained back-projection is performed to create a 3D volume for each projection image. A pig study has been performed, where 4D DSA acquisitions were performed with and without respiratory motion to evaluate the feasibility of the approach. The dice similarity coefficient between the reference 3D constraint volume and the motion compensated reconstruction was 51.12 % compared to 35.99 % without motion compensation. This technique could improve the workflow for procedures in interventional radiology, e.g. liver embolizations, where changes in blood flow have to be monitored carefully.

  2. Improving a data-acquisition software system with abstract data type components

    NASA Technical Reports Server (NTRS)

    Howard, S. D.

    1990-01-01

    Abstract data types and object-oriented design are active research areas in computer science and software engineering. Much of the interest is aimed at new software development. Abstract data type packages developed for a discontinued software project were used to improve a real-time data-acquisition system under maintenance. The result saved effort and contributed to a significant improvement in the performance, maintainability, and reliability of the Goldstone Solar System Radar Data Acquisition System.

  3. Energy Savings Performance Contract Energy Sales Agreement Toolkit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    FEMP developed the Energy Savings Performance Contracting Energy Sales Agreement (ESPC ESA) Toolkit to provide federal agency contracting officers and other acquisition team members with information that will facilitate the timely execution of ESPC ESA projects.

  4. Validation of Alternatives to Aliphatic Isocyanate Polyurethanes

    NASA Technical Reports Server (NTRS)

    Curran, Jerome

    2007-01-01

    The National Aeronautics and Space Administration (NASA) Headquarters chartered the Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objective of this effort is to demonstrate and validate alternatives to aliphatic isocyanate polyurethane coatings. Successful completion of this project will result in one or more isocyanate-free coating systems qualified for use at Air Force Space Command (AFSPC) and NASA centers participating in this study. The objective of this project is to qualify the candidates under the specifications for the standard system. This project will compare coating performance of the proposed alternatives to existing coating systems or standards.

  5. The Army Study Program Fiscal Year 1993 Report

    DTIC Science & Technology

    1992-11-16

    results of the PERFORMER: CAA Ardennes campaign and, if necessary, to recommend modifications to CEM. PROJECT TITLE: Economic Analysis Of HODA Automation...DCSOPS PERFORMER: CAA PROJECT TITLE: Wartime Requirements, FY 99 PUIC: CSCAMNO15 To assist HODA in determining conventional munition requirements...STUDY WILL ATTEMPT TO DEVELOP A MULTIPLE CRITERIA OPTIMIZATION MODEL DTIC NUMBER: TO AID IN THE PROGRAMMING OF ARMY ACQUISITION FUNDS AT HODA . THE

  6. American Recovery and Reinvestment Act -- U.S. Army Corps of Engineers Mobile District Contractor Performance and Reporting Controls Were Generally Effective

    DTIC Science & Technology

    2012-01-06

    Figure 2 shows the Supervisory Control and Data Acquisition and Hydromet Equipment at the Stennis Lock and Dam in Columbus. 3 Figure 2...Supervisory Control and Data Acquisition and Hydromet Equipment for the Waterway at the Stennis Lock and Dam • Tinker Air Force Base Project...Tennessee-Tombigbee Waterway, AL & MS W91278-10-C-0051 Upgrade of Supervisory Control and Data Acquisition and Hydromet Equipment for the Waterway

  7. Acquisition and production of skilled behavior in dynamic decision-making tasks

    NASA Technical Reports Server (NTRS)

    Kirlik, Alex

    1993-01-01

    Summaries of the four projects completed during the performance of this research are included. The four projects described are: Perceptual Augmentation Aiding for Situation Assessment, Perceptual Augmentation Aiding for Dynamic Decision-Making and Control, Action Advisory Aiding for Dynamic Decision-Making and Control, and Display Design to Support Time-Constrained Route Optimization. Papers based on each of these projects are currently in preparation. The theoretical framework upon which the first three projects are based, Ecological Task Analysis, was also developed during the performance of this research, and is described in a previous report. A project concerned with modeling strategies in human control of a dynamic system was also completed during the performance of this research.

  8. Dew Point Evaporative Comfort Cooling

    DTIC Science & Technology

    2012-11-01

    assisting with the installation of the data acquisition system and multiyear performance testing. Fort Carson engineers worked with the project...partners to design and integrate the Coolerado units into five facilities and designed an innovative rain water catchment system for four units at the...Theater. Mountain Energy Partnership provided invaluable assistance with the design and installation of the data acquisition system , as well as data

  9. LANDSAT-D Investigations Workshop

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Viewgraphs are presented which highlight LANDSAT-D project status and ground segment; early access TM processing; LANDSAT-D data acquisition and availability; LANDSAT-D performance characterization; MSS pre-NOAA characterization; MSS radiometric sensor performance (spectral information, absolute calibration, and ground processing); MSS geometric sensor performance; and MSS geometric processing and calibration.

  10. Analysis of Expedited Defense Contracting Methods in the Acquisition of Emerging Technology

    DTIC Science & Technology

    2016-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT ANALYSIS OF EXPEDITED DEFENSE CONTRACTING METHODS IN THE...CONTRACTING METHODS IN THE ACQUISITION OF EMERGING TECHNOLOGY 5. FUNDING NUMBERS 6. AUTHOR(S) Jacob D. Sabin and Mark K. Zakner 7. PERFORMING...firms. The DOD has authority for applying non-traditional contracting methods to better adapt to this competitive marketplace. This project studied non

  11. Feasibility of developing a portable driver performance data acquisition system for human factors research: Technical tasks. Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, R.J.; Barickman, F.S.; Spelt, P.F.

    1998-01-01

    A two-phase, multi-year research program entitled ``development of a portable driver performance data acquisition system for human factors research`` was recently completed. The primary objective of the project was to develop a portable data acquisition system for crash avoidance research (DASCAR) that will allow drive performance data to be collected using a large variety of vehicle types and that would be capable of being installed on a given vehicle type within a relatively short-time frame. During phase 1 a feasibility study for designing and fabricating DASCAR was conducted. In phase 2 of the research DASCAR was actually developed and validated.more » This technical memorandum documents the results from the feasibility study. It is subdivided into three volumes. Volume one (this report) addresses the last five items in the phase 1 research and the first issue in the second phase of the project. Volumes two and three present the related appendices, and the design specifications developed for DASCAR respectively. The six tasks were oriented toward: identifying parameters and measures; identifying analysis tools and methods; identifying measurement techniques and state-of-the-art hardware and software; developing design requirements and specifications; determining the cost of one or more copies of the proposed data acquisition system; and designing a development plan and constructing DASCAR. This report also covers: the background to the program; the requirements for the project; micro camera testing; heat load calculations for the DASCAR instrumentation package in automobile trunks; phase 2 of the research; the DASCAR hardware and software delivered to the National Highway Traffic Safety Administration; and crash avoidance problems that can be addressed by DASCAR.« less

  12. Qualification Requirement Perceptions of the United States Army Acquisition Workforce Since Implementation of the Defense Acquisition Workforce Improvement Act (DAWIA)

    DTIC Science & Technology

    2013-12-01

    for the sake of learning is not the end, but only the means to an end ( Newman , 1947). The end is more about job impact and actual business results...requirements to what skills the employee actually needs to perform their job. The current cookie-cutter style of training requirements is a...acquisition process on the whole for large scale projects/programs. Acq. Level 2.5(B) - Based on the Parent program the employee works for and

  13. Medium Spatial Resolution Satellite Characterization

    NASA Technical Reports Server (NTRS)

    Stensaas, Greg

    2007-01-01

    This project provides characterization and calibration of aerial and satellite systems in support of quality acquisition and understanding of remote sensing data, and verifies and validates the associated data products with respect to ground and and atmospheric truth so that accurate value-added science can be performed. The project also provides assessment of new remote sensing technologies.

  14. A review of breast tomosynthesis. Part II. Image reconstruction, processing and analysis, and advanced applications

    PubMed Central

    Sechopoulos, Ioannis

    2013-01-01

    Many important post-acquisition aspects of breast tomosynthesis imaging can impact its clinical performance. Chief among them is the reconstruction algorithm that generates the representation of the three-dimensional breast volume from the acquired projections. But even after reconstruction, additional processes, such as artifact reduction algorithms, computer aided detection and diagnosis, among others, can also impact the performance of breast tomosynthesis in the clinical realm. In this two part paper, a review of breast tomosynthesis research is performed, with an emphasis on its medical physics aspects. In the companion paper, the first part of this review, the research performed relevant to the image acquisition process is examined. This second part will review the research on the post-acquisition aspects, including reconstruction, image processing, and analysis, as well as the advanced applications being investigated for breast tomosynthesis. PMID:23298127

  15. 48 CFR 1334.201-70 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... criticality, or risk potential. (b) If a project manager considers the use of an EVMS to be necessary for a... the Department's Information Technology Investment Performance Measurement and Performance Reporting Policy, the use of an Earned Value Management System (EVMS) is required for major acquisitions for...

  16. One-Step and Two-Step Facility Acquisition for Military Construction: Project Selection and Implementation Procedures

    DTIC Science & Technology

    1990-08-01

    the guidance in this report. 1-4. Scope This guidance covers selection of projects suitable for a One-Step or Two-Step approach, development of design...conducted, focus on resolving proposal deficiencies; prices are not "negotiated" in the common use of the term. A Request for Proposal (RFP) states project ...carefully examines experience and past performance in the design of similar projects and building types. Quality of

  17. ORAC: a modern observing system for UKIRT

    NASA Astrophysics Data System (ADS)

    Bridger, Alan; Wright, Gillian S.; Economou, Frossie; Tan, Min; Currie, Malcolm J.; Pickup, David A.; Adamson, Andrew J.; Rees, Nicholas P.; Purves, Maren; Kackley, Russell

    2000-06-01

    The steady improvement in telescope performance at UKIRT and the increase in data acquisition rates led to a strong desired for an integrated observing framework that would meet the needs of future instrumentation, as well as providing some support for existing instrumentation. Thus the Observatory Reduction and Acquisition Control (ORAC) project was created in 1997 with the goals of improving the scientific productivity in the telescope, reducing the overall ongoing support requirements, and eventually supporting the use of more flexibly scheduled observing. The project was also expected to achieve this within a tight resource allocation. In October 1999 the ORAC system was commissioned at the United Kingdom Infrared Telescope.

  18. Engineering Data Compendium. Human Perception and Performance, Volume 1

    NASA Technical Reports Server (NTRS)

    Boff, Kenneth R. (Editor); Lincoln, Janet E. (Editor)

    1988-01-01

    The concept underlying the Engineering Data Compendium was the product an R and D program (Integrated Perceptual Information for Designers project) aimed at facilitating the application of basic research findings in human performance to the design of military crew systems. The principal objective was to develop a workable strategy for: (1) identifying and distilling information of potential value to system design from existing research literature, and (2) presenting this technical information in a way that would aid its accessibility, interpretability, and applicability by system designers. The present four volumes of the Engineering Data Compendium represent the first implementation of this strategy. This is Volume 1, which contains sections on Visual Acquisition of Information, Auditory Acquisition of Information, and Acquisition of Information by Other Senses.

  19. Multi-Objective Optimization of System Capability Satisficing in Defense Acquisition

    DTIC Science & Technology

    2012-01-01

    of System Capability Satisficing in Defense Acquisition 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Stevens Institute of Technology,School of Systems...Report (SAR) 18. NUMBER OF PAGES 27 19a. NAME OF RESPONSIBLE PERSON a. REPORT unclassified b. ABSTRACT

  20. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  1. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  2. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  3. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  4. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  5. Design and Realization of Online Monitoring System of Distributed New Energy and Renewable Energy

    NASA Astrophysics Data System (ADS)

    Tang, Yanfen; Zhou, Tao; Li, Mengwen; Zheng, Guotai; Li, Hao

    2018-01-01

    Aimed at difficult centralized monitoring and management of current distributed new energy and renewable energy generation projects due to great varieties, different communication protocols and large-scale difference, this paper designs a online monitoring system of new energy and renewable energy characterized by distributed deployment, tailorable functions, extendible applications and fault self-healing performance. This system is designed based on international general standard for grid information data model, formulates unified data acquisition and transmission standard for different types of new energy and renewable energy generation projects, and can realize unified data acquisition and real-time monitoring of new energy and renewable energy generation projects, such as solar energy, wind power, biomass energy, etc. within its jurisdiction. This system has applied in Beijing. At present, 576 projects are connected to the system. Good effect is achieved and stability and reliability of the system have been validated.

  6. Space Science

    NASA Image and Video Library

    1995-06-08

    Scientists at Marshall's Adaptive Optics Lab demonstrate the Wave Front Sensor alignment using the Phased Array Mirror Extendible Large Aperture (PAMELA) optics adjustment. The primary objective of the PAMELA project is to develop methods for aligning and controlling adaptive optics segmented mirror systems. These systems can be used to acquire or project light energy. The Next Generation Space Telescope is an example of an energy acquisition system that will employ segmented mirrors. Light projection systems can also be used for power beaming and orbital debris removal. All segmented optical systems must be adjusted to provide maximum performance. PAMELA is an on going project that NASA is utilizing to investigate various methods for maximizing system performance.

  7. Acquisition Systems Protection Planning the Manhatten Project: A Case Study

    DTIC Science & Technology

    1994-06-03

    This study examines the counterintelligence and security programs of the Manhattan Project , the United States acquisition of the atomic bomb, using...assessment methodology and counterintelligence techniques and procedures. Acquisition systems, Program protection, Manhattan Project , Atomic bomb, Technology protection, Counterintelligence, Security.

  8. Connected commercial vehicles-integrated truck project : data acquisition system (DAS) documentation.

    DOT National Transportation Integrated Search

    1996-08-01

    The report documents work performed under the FTA Advanced Public Transportation Systems (APTS) Program, a program structured to undertake research and development of innovative applications of advanced navigation, information, and communication tech...

  9. The acquisition, storage, and dissemination of LANDSAT and other LACIE support data

    NASA Technical Reports Server (NTRS)

    Abbotts, L. F.; Nelson, R. M. (Principal Investigator)

    1979-01-01

    Activities performed at the LACIE physical data library are described. These include the researching, acquisition, indexing, maintenance, distribution, tracking, and control of LACIE operational data and documents. Much of the data available can be incorporated into an Earth resources data base. Elements of the data collection that can support future remote sensing programs include: (1) the LANDSAT full-frame image files; (2) the microfilm file of aerial and space photographic and multispectral maps and charts that encompasses a large portion of the Earth's surface; (3) the map/chart collection that includes various scale maps and charts for a good portion of the U.S. and the LACIE area in foreign countries; (4) computer-compatible tapes of good quality LANDSAT scenes; (5) basic remote sensing data, project data, reference material, and associated publications; (6) visual aids to support presentation on remote sensing projects; and (7) research acquisition and handling procedures for managing data.

  10. Phased Array Mirror Extendible Large Aperture (PAMELA) Optics Adjustment

    NASA Technical Reports Server (NTRS)

    1995-01-01

    Scientists at Marshall's Adaptive Optics Lab demonstrate the Wave Front Sensor alignment using the Phased Array Mirror Extendible Large Aperture (PAMELA) optics adjustment. The primary objective of the PAMELA project is to develop methods for aligning and controlling adaptive optics segmented mirror systems. These systems can be used to acquire or project light energy. The Next Generation Space Telescope is an example of an energy acquisition system that will employ segmented mirrors. Light projection systems can also be used for power beaming and orbital debris removal. All segmented optical systems must be adjusted to provide maximum performance. PAMELA is an on going project that NASA is utilizing to investigate various methods for maximizing system performance.

  11. Evaluation of noise and blur effects with SIRT-FISTA-TV reconstruction algorithm: Application to fast environmental transmission electron tomography.

    PubMed

    Banjak, Hussein; Grenier, Thomas; Epicier, Thierry; Koneti, Siddardha; Roiban, Lucian; Gay, Anne-Sophie; Magnin, Isabelle; Peyrin, Françoise; Maxim, Voichita

    2018-06-01

    Fast tomography in Environmental Transmission Electron Microscopy (ETEM) is of a great interest for in situ experiments where it allows to observe 3D real-time evolution of nanomaterials under operating conditions. In this context, we are working on speeding up the acquisition step to a few seconds mainly with applications on nanocatalysts. In order to accomplish such rapid acquisitions of the required tilt series of projections, a modern 4K high-speed camera is used, that can capture up to 100 images per second in a 2K binning mode. However, due to the fast rotation of the sample during the tilt procedure, noise and blur effects may occur in many projections which in turn would lead to poor quality reconstructions. Blurred projections make classical reconstruction algorithms inappropriate and require the use of prior information. In this work, a regularized algebraic reconstruction algorithm named SIRT-FISTA-TV is proposed. The performance of this algorithm using blurred data is studied by means of a numerical blur introduced into simulated images series to mimic possible mechanical instabilities/drifts during fast acquisitions. We also present reconstruction results from noisy data to show the robustness of the algorithm to noise. Finally, we show reconstructions with experimental datasets and we demonstrate the interest of fast tomography with an ultra-fast acquisition performed under environmental conditions, i.e. gas and temperature, in the ETEM. Compared to classically used SIRT and SART approaches, our proposed SIRT-FISTA-TV reconstruction algorithm provides higher quality tomograms allowing easier segmentation of the reconstructed volume for a better final processing and analysis. Copyright © 2018 Elsevier B.V. All rights reserved.

  12. GPU-accelerated regularized iterative reconstruction for few-view cone beam CT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matenine, Dmitri, E-mail: dmitri.matenine.1@ulaval.ca; Goussard, Yves, E-mail: yves.goussard@polymtl.ca; Després, Philippe, E-mail: philippe.despres@phy.ulaval.ca

    2015-04-15

    Purpose: The present work proposes an iterative reconstruction technique designed for x-ray transmission computed tomography (CT). The main objective is to provide a model-based solution to the cone-beam CT reconstruction problem, yielding accurate low-dose images via few-views acquisitions in clinically acceptable time frames. Methods: The proposed technique combines a modified ordered subsets convex (OSC) algorithm and the total variation minimization (TV) regularization technique and is called OSC-TV. The number of subsets of each OSC iteration follows a reduction pattern in order to ensure the best performance of the regularization method. Considering the high computational cost of the algorithm, it ismore » implemented on a graphics processing unit, using parallelization to accelerate computations. Results: The reconstructions were performed on computer-simulated as well as human pelvic cone-beam CT projection data and image quality was assessed. In terms of convergence and image quality, OSC-TV performs well in reconstruction of low-dose cone-beam CT data obtained via a few-view acquisition protocol. It compares favorably to the few-view TV-regularized projections onto convex sets (POCS-TV) algorithm. It also appears to be a viable alternative to full-dataset filtered backprojection. Execution times are of 1–2 min and are compatible with the typical clinical workflow for nonreal-time applications. Conclusions: Considering the image quality and execution times, this method may be useful for reconstruction of low-dose clinical acquisitions. It may be of particular benefit to patients who undergo multiple acquisitions by reducing the overall imaging radiation dose and associated risks.« less

  13. Modeling the Evolution of a Science Project in Software-Reliant System Acquisition Programs

    DTIC Science & Technology

    2013-07-24

    might: • Limit worker burnout • Perform better regarding schedule 10 Software Technology Conference April 10, 2013 © 2013 Carnegie Mellon...University The Evolution of a Science Project Key Preliminary Findings -3 The tipping point contributes to the “90% Done” Syndrome Percentage...worker burnout - SP User Satisfaction SP increasing satisfaction indicated satisfaction + + B3 Moderating User Satisfaction overage switch demand switch

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, D; Kang, S; Kim, T

    Purpose: Patient breathing-related sorting method of projections in 4D digital tomosythesis (DTS) can be suffered from severe artifacts due to non-uniform angle distribution of projections and noncoplanar reconstructed images for each phase. In this study, we propose a method for optimally acquiring projection images in 4D DTS. Methods: In this method every pair of projections at x-ray tube’s gantry angles symmetrical with respect to the center of the range of gantry rotation is obtained at the same respiration amplitude. This process is challenging but becomes feasible with visual-biofeedback using a patient specific respiration guide wave which is in sinusoidal shapemore » (i.e., smooth and symmetrical enough). Depending on scan parameters such as the number of acquisition points per cycle, total scan angle and projections per acquisition amplitude, acquisition sequence is pre-determined. A simulation study for feasibility test was performed. To mimic actual situation closely, a group of volunteers were recruited and breathing data were acquired both with/without biofeedback. Then, x-ray projections for a humanoid phantom were virtually performed following (1) the breathing data from volunteers without guide, (2) the breathing data with guide and (3) the planned breathing data (i.e., ideal situation). Images from all of 3 scenarios were compared. Results: Scenario #2 showed significant artifact reduction compared to #1 while did minimal increase from the ideal situation (i.e., scenario #3). We verified the performance of the method with regard to the degree of inaccuracy during respiratory guiding. Also, the scan angle dependence-related differences in the DTS images could reduce between using the proposed method and the established patient breathing-related sorting method. Conclusion: Through the proposed 4D DTS method, it is possible to improve the accuracy of image guidance between intra/inter fractions with relatively low imaging dose. This research was supported by the Mid-career Researcher Program through NRF funded by the Ministry of Science, ICT & Future Planning of Korea (NRF-2014R1A2A1A10050270) and by the Radiation Technology R&D program through the National Research Foundation of Korea funded by the Ministry of Science, ICT & Future Planning (No. 2013M2A2A7038291)« less

  15. Interior tomography in microscopic CT with image reconstruction constrained by full field of view scan at low spatial resolution

    NASA Astrophysics Data System (ADS)

    Luo, Shouhua; Shen, Tao; Sun, Yi; Li, Jing; Li, Guang; Tang, Xiangyang

    2018-04-01

    In high resolution (microscopic) CT applications, the scan field of view should cover the entire specimen or sample to allow complete data acquisition and image reconstruction. However, truncation may occur in projection data and results in artifacts in reconstructed images. In this study, we propose a low resolution image constrained reconstruction algorithm (LRICR) for interior tomography in microscopic CT at high resolution. In general, the multi-resolution acquisition based methods can be employed to solve the data truncation problem if the project data acquired at low resolution are utilized to fill up the truncated projection data acquired at high resolution. However, most existing methods place quite strict restrictions on the data acquisition geometry, which greatly limits their utility in practice. In the proposed LRICR algorithm, full and partial data acquisition (scan) at low and high resolutions, respectively, are carried out. Using the image reconstructed from sparse projection data acquired at low resolution as the prior, a microscopic image at high resolution is reconstructed from the truncated projection data acquired at high resolution. Two synthesized digital phantoms, a raw bamboo culm and a specimen of mouse femur, were utilized to evaluate and verify performance of the proposed LRICR algorithm. Compared with the conventional TV minimization based algorithm and the multi-resolution scout-reconstruction algorithm, the proposed LRICR algorithm shows significant improvement in reduction of the artifacts caused by data truncation, providing a practical solution for high quality and reliable interior tomography in microscopic CT applications. The proposed LRICR algorithm outperforms the multi-resolution scout-reconstruction method and the TV minimization based reconstruction for interior tomography in microscopic CT.

  16. Performance Based Logistics... What’s Stopping Us

    DTIC Science & Technology

    2016-03-01

    performance-based life cycle product support, where outcomes are acquired through performance-based arrangements that deliver Warfighter requirements and...correlates to the acquisition life cycle framework: spend the time and effort to identify and lock in the PBL requirements; conduct an analysis to...PDASD[L&MR]) on PBL strategies. The study, Project Proof Point: A Study to Determine the Impact of Performance Based Logistics (PBL) on Life Cycle

  17. The sweet-home project: audio technology in smart homes to improve well-being and reliance.

    PubMed

    Vacher, Michel; Istrate, Dan; Portet, François; Joubert, Thierry; Chevalier, Thierry; Smidtas, Serge; Meillon, Brigitte; Lecouteux, Benjamin; Sehili, Mohamed; Chahuara, Pedro; Méniard, Sylvain

    2011-01-01

    The Sweet-Home project aims at providing audio-based interaction technology that lets the user have full control over their home environment, at detecting distress situations and at easing the social inclusion of the elderly and frail population. This paper presents an overview of the project focusing on the multimodal sound corpus acquisition and labelling and on the investigated techniques for speech and sound recognition. The user study and the recognition performances show the interest of this audio technology.

  18. Federal Motor Carrier Safety Administration’s Advanced System Testing Utilizing a Data Acquisition System on the Highways (FAST DASH) Safety Technology Evaluation Project #2: Driver Monitoring Final Report.

    DOT National Transportation Integrated Search

    2016-12-01

    An independent evaluation of a non-video-based onboard monitoring system (OBMS) was conducted. The objective was to determine if the OBMS system performed reliably, improved driving safety and performance, and improved fuel efficiency in a commercial...

  19. Federal Motor Carrier Safety Administration’s advanced system testing utilizing a data acquisition system on the highways (FAST DASH) safety technology evaluation project #2 : driver monitoring, final report.

    DOT National Transportation Integrated Search

    2016-11-01

    An independent evaluation of a non-video-based onboard monitoring system (OBMS) was conducted. The objective was to determine if the OBMS system performed reliably, improved driving safety and performance, and improved fuel efficiency in a commercial...

  20. Summary document of tasks performed on the Shuttle-C/NLS contract

    NASA Technical Reports Server (NTRS)

    1993-01-01

    During FY92, USBI performed many programmatic related tasks. These programmatic tasks have been categorized as follows: (1) acquisition; (2) project engineering/program planning; and (3) cost. The reports associated with these tasks follow in paragraphs 1.1.1 through 1.3.3. Proceeding each task report is a brief description of the contents contained within.

  1. 48 CFR 22.503 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 22.503 Section 22.503 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS... Projects 22.503 Policy. (a) Project labor agreements are a tool that agencies may use to promote economy...

  2. Autonomous Navigation Improvements for High-Earth Orbiters Using GPS

    NASA Technical Reports Server (NTRS)

    Long, Anne; Kelbel, David; Lee, Taesul; Garrison, James; Carpenter, J. Russell; Bauer, F. (Technical Monitor)

    2000-01-01

    The Goddard Space Flight Center is currently developing autonomous navigation systems for satellites in high-Earth orbits where acquisition of the GPS signals is severely limited This paper discusses autonomous navigation improvements for high-Earth orbiters and assesses projected navigation performance for these satellites using Global Positioning System (GPS) Standard Positioning Service (SPS) measurements. Navigation performance is evaluated as a function of signal acquisition threshold, measurement errors, and dynamic modeling errors using realistic GPS signal strength and user antenna models. These analyses indicate that an autonomous navigation position accuracy of better than 30 meters root-mean-square (RMS) can be achieved for high-Earth orbiting satellites using a GPS receiver with a very stable oscillator. This accuracy improves to better than 15 meters RMS if the GPS receiver's signal acquisition threshold can be reduced by 5 dB-Hertz to track weaker signals.

  3. Implementation of TAMSIM and EROW right-of-way acquisition decision - support tools.

    DOT National Transportation Integrated Search

    2011-04-01

    An implementation project was performed to initiate use of TAMSIM and EROW tools in region offices and : the Right of Way (ROW) Division. The research team worked with Texas Department of Transportation : regional ROW staffs to apply both tools to a ...

  4. 32 CFR 644.5 - Mineral acquisition practices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Mineral acquisition practices. 644.5 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral acquisition practices. (a... accommodate projects authorized by the Congress is to permit the reservation of the minerals in the land...

  5. 32 CFR 644.5 - Mineral acquisition practices.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Mineral acquisition practices. 644.5 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral acquisition practices. (a... accommodate projects authorized by the Congress is to permit the reservation of the minerals in the land...

  6. 32 CFR 644.5 - Mineral Acquisition Practices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Mineral Acquisition Practices. 644.5 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral Acquisition Practices. (a... accommodate projects authorized by the Congress is to permit the reservation of the minerals in the land...

  7. 32 CFR 644.5 - Mineral acquisition practices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Mineral acquisition practices. 644.5 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral acquisition practices. (a... accommodate projects authorized by the Congress is to permit the reservation of the minerals in the land...

  8. Acquisition of a High Performance Computer Cluster for Materials Research and Education

    DTIC Science & Technology

    2015-04-17

    separation in all-organic and hybrid organic- inorganic solar cells. The outcome of the project 1. REPORT DATE (DD-MM-YYYY) 4. TITLE AND SUBTITLE 13...diffusion and interfacial charge separation in all-organic and hybrid organic- inorganic solar cells. The outcome of the project is the development...simulations to predict charge carrier mobilities, exciton diffusion and interfacial charge separation in all- organic and hybrid organic- inorganic solar

  9. Linking Logistics and Operations: A Case Study of World War II Air Power

    DTIC Science & Technology

    1991-01-01

    Weapon System Evaluation Group, 1951, p. 30). The logistic innovation greatly extended the time that combat ships could remain on station and...presented. This Note was produced under the Project AIR FORCE Resource Management and System Acquisition Program in the project "Combat Support C3 Needs...maintenance workload data suggest either unacceptable system performance or excessive costs. The predictive power of these models is so poor as to

  10. Photoacoustic Imaging of Animals with an Annular Transducer Array

    NASA Astrophysics Data System (ADS)

    Yang, Di-Wu; Zhou, Zhi-Bin; Zeng, Lv-Ming; Zhou, Xin; Chen, Xing-Hui

    2014-07-01

    A photoacoustic system with an annular transducer array is presented for rapid, high-resolution photoacoustic tomography of animals. An eight-channel data acquisition system is applied to capture the photoacoustic signals by using multiplexing and the total time of data acquisition and transferring is within 3 s. A limited-view filtered back projection algorithm is used to reconstruct the photoacoustic images. Experiments are performed on a mouse head and a rabbit head and clear photoacoustic images are obtained. The experimental results demonstrate that this imaging system holds the potential for imaging the human brain.

  11. Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2006-02-28

    NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional...Systems ( NGSS ) division. The Navy has not procured any frigates since FY1984, when the last FFG-7 was procured. 20 In earlier years, some Navy surface...Defense for Acquisition, Technology, and Logistics (USD AT&L) in February 2004, the first DD(X) would be built by NGSS , the second DD(X) would be built GD

  12. FMCSA’s advanced system testing utilizing a data acquisition system on the highways (FAST DASH) safety technology evaluation project #2 : technology brief.

    DOT National Transportation Integrated Search

    2016-11-01

    The Federal Motor Carrier Safety Administration (FMCSA) established the FAST DASH program to perform efficient independent evaluations of promising safety technologies aimed at commercial vehicle operations. In this second FAST DASH safety technology...

  13. 48 CFR 301.607-70 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... General. In accordance with the Federal Acquisition Certification—Program and Project Managers (FAC-P/PM) program, HHS has established a certification program for Program or Project Managers. See HHS' Federal Acquisition Certification—Program and Project Managers Handbook (P/PM Handbook) for information on the methods...

  14. 48 CFR 301.607 - Certification of Program and Project Managers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Certification of Program and Project Managers. 301.607 Section 301.607 Federal Acquisition Regulations System HEALTH AND HUMAN... Responsibilities 301.607 Certification of Program and Project Managers. ...

  15. Virtual temporal bone dissection system: OSU virtual temporal bone system: development and testing.

    PubMed

    Wiet, Gregory J; Stredney, Don; Kerwin, Thomas; Hittle, Bradley; Fernandez, Soledad A; Abdel-Rasoul, Mahmoud; Welling, D Bradley

    2012-03-01

    The objective of this project was to develop a virtual temporal bone dissection system that would provide an enhanced educational experience for the training of otologic surgeons. A randomized, controlled, multi-institutional, single-blinded validation study. The project encompassed four areas of emphasis: structural data acquisition, integration of the system, dissemination of the system, and validation. Structural acquisition was performed on multiple imaging platforms. Integration achieved a cost-effective system. Dissemination was achieved on different levels including casual interest, downloading of software, and full involvement in development and validation studies. A validation study was performed at eight different training institutions across the country using a two-arm randomized trial where study subjects were randomized to a 2-week practice session using either the virtual temporal bone or standard cadaveric temporal bones. Eighty subjects were enrolled and randomized to one of the two treatment arms; 65 completed the study. There was no difference between the two groups using a blinded rating tool to assess performance after training. A virtual temporal bone dissection system has been developed and compared to cadaveric temporal bones for practice using a multicenter trial. There was no statistical difference between practice on the current simulator compared to practice on human cadaveric temporal bones. Further refinements in structural acquisition and interface design have been identified, which can be implemented prior to full incorporation into training programs and used for objective skills assessment. Copyright © 2012 The American Laryngological, Rhinological, and Otological Society, Inc.

  16. Motivating the Knowledge Worker

    DTIC Science & Technology

    2010-01-01

    GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S...AND ADDRESS(ES) Defense Intelligence Agency Acquisition,Arlington,VA,22202 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY...interpret, and synthesize information within specific subject areas to advance the overall understanding of those areas and allow organizations to make

  17. Performance Based Logistics: Optimizing Total System Availability and Reducing Program Cost

    DTIC Science & Technology

    2011-03-14

    MONITOR’S REPORT Dr. Paul C. Jussel NUMBER(S) U.S. Army War College 12. DISTRIBUTION / AVAILABILITY STATEMENT Distribution Statement A...Colonel David M. Kaczmarski United States Army Dr. Paul C. Jussel Project Adviser This CRP is submitted in...8911927-1.html# (accessed 10 November 2010) 2 Hurst, Dana . Performance Based Logistics – A Bridge Between Acquisition Reform and Logistics Supply

  18. Building a multidisciplinary team for burn treatment - Lessons learned from the Montreal tendon transfer experience.

    PubMed

    Karam, E; Lévesque, M C; Jacquemin, G; Delure, A; Robidoux, I; Laramée, M T; Odobescu, A; Harris, P G; Danino, A M

    2014-03-31

    Multidisciplinary teams (MDTs) represent a recognized component of care in the treatment of complex conditions such as burns. However, most institutions do not provide adequate support for the formation of these teams. Furthermore, the majority of specialists lack the managerial skills required to create a team and have difficulties finding the proper tools. Our objective is to provide an insight for health care professionals, who wish to form a MDT for burn treatment, on the challenges that are likely to be faced, and to identify key elements that may facilitate the establishment of such a project. The setting for this was a plastic surgery department and rehabilitation center at a national reference center. A qualitative analysis was performed on all correspondences related to our tetraplegia project, from 2006 to 2008. To guide our thematic analysis, we used a form of systems theory known as the complexity theory. The qualitative analysis was performed using the NVivo software (Version 8.0 QSR International Melbourne, Australia). Lastly, the data was organized in chronologic order. Three main themes emerged from the results: knowledge acquisition, project organizational setup and project steps design. These themes represented respectively 24%, 50% and 26% of all correspondences. Project steps design and knowledge acquisition correspondences increased significantly after the introduction of the mentor team to our network. We conclude that an early association with a mentor team is beneficial for the establishment of a MDT.

  19. Optimization of image quality and acquisition time for lab-based X-ray microtomography using an iterative reconstruction algorithm

    NASA Astrophysics Data System (ADS)

    Lin, Qingyang; Andrew, Matthew; Thompson, William; Blunt, Martin J.; Bijeljic, Branko

    2018-05-01

    Non-invasive laboratory-based X-ray microtomography has been widely applied in many industrial and research disciplines. However, the main barrier to the use of laboratory systems compared to a synchrotron beamline is its much longer image acquisition time (hours per scan compared to seconds to minutes at a synchrotron), which results in limited application for dynamic in situ processes. Therefore, the majority of existing laboratory X-ray microtomography is limited to static imaging; relatively fast imaging (tens of minutes per scan) can only be achieved by sacrificing imaging quality, e.g. reducing exposure time or number of projections. To alleviate this barrier, we introduce an optimized implementation of a well-known iterative reconstruction algorithm that allows users to reconstruct tomographic images with reasonable image quality, but requires lower X-ray signal counts and fewer projections than conventional methods. Quantitative analysis and comparison between the iterative and the conventional filtered back-projection reconstruction algorithm was performed using a sandstone rock sample with and without liquid phases in the pore space. Overall, by implementing the iterative reconstruction algorithm, the required image acquisition time for samples such as this, with sparse object structure, can be reduced by a factor of up to 4 without measurable loss of sharpness or signal to noise ratio.

  20. Demonstration of a fully differential VGA chip with small THD for ECG acquisition system

    NASA Astrophysics Data System (ADS)

    Gongli, Xiao; Yuliang, Qin; Weilin, Xu; Baolin, Wei; Jihai, Duan; Xueming, Wei

    2015-10-01

    We present both a theoretical and experimental demonstration of a fully differential variable gain amplifier (VGA) with small total harmonic distortion (THD) for an electrocardiogram (ECG) acquisition system. Capacitive feedback technology is adopted to reduce the nonlinearity of VGA. The fully differential VGA has been fabricated in SMIC 0.18-μm CMOS process, and it only occupies 0.11 mm2. The measurements are in good agreement with simulation results. Experimental results show that the gain of VGA changes from 6.17 to 43.75 dB with a gain step of 3 dB. The high-pass corner frequency and low-pass corner frequency are around 0.22 Hz and 7.9 kHz, respectively. For each gain configuration, a maximal THD of 0.13% is obtained. The fully differential VGA has a low THD and its key performance parameters are well satisfied with the demands of ECG acquisition system application in the UWB wireless body area network. Project supported by the National Natural Science Foundation of China (Nos. 61264001, 61465004, 61161003, 61166004), the Guangxi Natural Science Foundation (Nos. 2013GXNSFAA019333, 2013GXNSFAA019338), the Science and Technology Research Key Project of Guangxi Department of Education (No. 2013ZD026), and the Innovation Project of GUET Graduate Education (No. GDYCSZ201457).

  1. 43 CFR 8.0 - Acquisition of lands for reservoir projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... projects. 8.0 Section 8.0 Public Lands: Interior Office of the Secretary of the Interior JOINT POLICIES OF THE DEPARTMENTS OF THE INTERIOR AND OF THE ARMY RELATIVE TO RESERVOIR PROJECT LANDS § 8.0 Acquisition of lands for reservoir projects. In so far as permitted by law, it is the policy of the Departments...

  2. 43 CFR 8.0 - Acquisition of lands for reservoir projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... projects. 8.0 Section 8.0 Public Lands: Interior Office of the Secretary of the Interior JOINT POLICIES OF THE DEPARTMENTS OF THE INTERIOR AND OF THE ARMY RELATIVE TO RESERVOIR PROJECT LANDS § 8.0 Acquisition of lands for reservoir projects. In so far as permitted by law, it is the policy of the Departments...

  3. 43 CFR 8.0 - Acquisition of lands for reservoir projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... projects. 8.0 Section 8.0 Public Lands: Interior Office of the Secretary of the Interior JOINT POLICIES OF THE DEPARTMENTS OF THE INTERIOR AND OF THE ARMY RELATIVE TO RESERVOIR PROJECT LANDS § 8.0 Acquisition of lands for reservoir projects. In so far as permitted by law, it is the policy of the Departments...

  4. 43 CFR 8.0 - Acquisition of lands for reservoir projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... projects. 8.0 Section 8.0 Public Lands: Interior Office of the Secretary of the Interior JOINT POLICIES OF THE DEPARTMENTS OF THE INTERIOR AND OF THE ARMY RELATIVE TO RESERVOIR PROJECT LANDS § 8.0 Acquisition of lands for reservoir projects. In so far as permitted by law, it is the policy of the Departments...

  5. FMCSA’s advanced system testing utilizing a data acquisition system on the highways (FAST DASH) safety technology evaluation project #3 : novel convex mirrors : technology brief.

    DOT National Transportation Integrated Search

    2016-11-01

    The Federal Motor Carrier Safety Administration (FMCSA) established the FAST DASH program to perform efficient independent evaluations of promising safety technologies aimed at commercial vehicle operations. In this third FAST DASH safety technology ...

  6. Catching a Wave: An Australian Case Study on Building Competence in Search of Competitive Advantage.

    ERIC Educational Resources Information Center

    Kellie, Deborah

    1998-01-01

    A case study of an Australian road construction company's skill development project is an example of an attempt to increase competitive advantage through competency acquisition. It remains to be seen whether reconstruction of the company will result in improved productivity and financial performance. (SK)

  7. 24 CFR 241.1010 - Feasibility letter.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Insurance for Equity Loans and Acquisition Loans... Commissioner's estimate of the supportable loan amount, based upon the project's equity in the case of an equity loan and based on the project's purchase price in the case of an acquisition loan, but such...

  8. A Study on Improving Defense Acquisition through the Application of Defense Acquisition Workforce Improvement Act (DAWIA) Concept to Defense Industry Workforce

    DTIC Science & Technology

    2009-09-01

    Executive CAIV Cost As an Independent Variable CAP Critical Acquisition Position CAPM Certified Associate in Project Management CCCM Certified...Professionals (PMP)............................33 b. Certified Associate in Project Management ( CAPM )............34 c. Program Management...34 Table 6. CAPM Requirements (After PMI CAPM , 2009). ...........................................34 Table 7

  9. Improving the Agency's Software Acquisition Capability

    NASA Technical Reports Server (NTRS)

    Hankinson, Allen

    2003-01-01

    External development of software has oftc n led to unsatisfactory results and great frustration for the assurE 7ce community. Contracts frequently omit critical assuranc 4 processes or the right to oversee software development activitie: At a time when NASA depends more and more on software to in plement critical system functions, combination of three factors ex; cerbate this problem: I ) the ever-increasing trend to acquire rather than develop software in-house, 2) the trend toward performance based contracts, and 3) acquisition vehicles that only state softwar 2 requirements while leaving development standards and assur! ince methodologies up to the contractor. We propose to identify specific methods at d tools that NASA projects can use to mitigate the adverse el ects of the three problems. TWO broad classes of methoddt ols will be explored. The first will be those that provide NASA p ojects with insight and oversight into contractors' activities. The st cond will be those that help projects objectively assess, and thus i nprwe, their software acquisition capability. Of particular interest is the Software Engineering Institute's (SEI) Software Acqt isition Capability Maturity Model (SA-CMMO).

  10. Preliminary study on X-ray fluorescence computed tomography imaging of gold nanoparticles: Acceleration of data acquisition by multiple pinholes scheme

    NASA Astrophysics Data System (ADS)

    Sasaya, Tenta; Sunaguchi, Naoki; Seo, Seung-Jum; Hyodo, Kazuyuki; Zeniya, Tsutomu; Kim, Jong-Ki; Yuasa, Tetsuya

    2018-04-01

    Gold nanoparticles (GNPs) have recently attracted attention in nanomedicine as novel contrast agents for cancer imaging. A decisive tomographic imaging technique has not yet been established to depict the 3-D distribution of GNPs in an object. An imaging technique known as pinhole-based X-ray fluorescence computed tomography (XFCT) is a promising method that can be used to reconstruct the distribution of GNPs from the X-ray fluorescence emitted by GNPs. We address the acceleration of data acquisition in pinhole-based XFCT for preclinical use using a multiple pinhole scheme. In this scheme, multiple projections are simultaneously acquired through a multi-pinhole collimator with a 2-D detector and full-field volumetric beam to enhance the signal-to-noise ratio of the projections; this enables fast data acquisition. To demonstrate the efficacy of this method, we performed an imaging experiment using a physical phantom with an actual multi-pinhole XFCT system that was constructed using the beamline AR-NE7A at KEK. The preliminary study showed that the multi-pinhole XFCT achieved a data acquisition time of 20 min at a theoretical detection limit of approximately 0.1 Au mg/ml and at a spatial resolution of 0.4 mm.

  11. Prototyping Control and Data Acquisition for the ITER Neutral Beam Test Facility

    NASA Astrophysics Data System (ADS)

    Luchetta, Adriano; Manduchi, Gabriele; Taliercio, Cesare; Soppelsa, Anton; Paolucci, Francesco; Sartori, Filippo; Barbato, Paolo; Breda, Mauro; Capobianco, Roberto; Molon, Federico; Moressa, Modesto; Polato, Sandro; Simionato, Paola; Zampiva, Enrico

    2013-10-01

    The ITER Neutral Beam Test Facility will be the project's R&D facility for heating neutral beam injectors (HNB) for fusion research operating with H/D negative ions. Its mission is to develop technology to build the HNB prototype injector meeting the stringent HNB requirements (16.5 MW injection power, -1 MeV acceleration energy, 40 A ion current and one hour continuous operation). Two test-beds will be built in sequence in the facility: first SPIDER, the ion source test-bed, to optimize the negative ion source performance, second MITICA, the actual prototype injector, to optimize ion beam acceleration and neutralization. The SPIDER control and data acquisition system is under design. To validate the main architectural choices, a system prototype has been assembled and performance tests have been executed to assess the prototype's capability to meet the control and data acquisition system requirements. The prototype is based on open-source software frameworks running under Linux. EPICS is the slow control engine, MDSplus is the data handler and MARTe is the fast control manager. The prototype addresses low and high-frequency data acquisition, 10 kS/s and 10 MS/s respectively, camera image acquisition, data archiving, data streaming, data retrieval and visualization, real time fast control with 100 μs control cycle and supervisory control.

  12. Ultrafast-based projection-reconstruction three-dimensional nuclear magnetic resonance spectroscopy.

    PubMed

    Mishkovsky, Mor; Kupce, Eriks; Frydman, Lucio

    2007-07-21

    Recent years have witnessed increased efforts toward the accelerated acquisition of multidimensional nuclear magnetic resonance (nD NMR) spectra. Among the methods proposed to speed up these NMR experiments is "projection reconstruction," a scheme based on the acquisition of a reduced number of two-dimensional (2D) NMR data sets constituting cross sections of the nD time domain being sought. Another proposition involves "ultrafast" spectroscopy, capable of completing nD NMR acquisitions within a single scan. Potential limitations of these approaches include the need for a relatively slow 2D-type serial data collection procedure in the former case, and a need for at least n high-performance, linearly independent gradients and a sufficiently high sensitivity in the latter. The present study introduces a new scheme that comes to address these limitations, by combining the basic features of the projection reconstruction and the ultrafast approaches into a single, unified nD NMR experiment. In the resulting method each member within the series of 2D cross sections required by projection reconstruction to deliver the nD NMR spectrum being sought, is acquired within a single scan with the aid of the 2D ultrafast protocol. Full nD NMR spectra can thus become available by backprojecting a small number of 2D sets, collected using a minimum number of scans. Principles, opportunities, and limitations of the resulting approach, together with demonstrations of its practical advantages, are here discussed and illustrated with a series of three-dimensional homo- and heteronuclear NMR correlation experiments.

  13. 75 FR 19167 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-41; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ...; Introduction; FAR Case 2009-005, Use of Project Labor Agreements for Federal Construction Projects; Federal...; Introduction AGENCIES: Department of Defense (DoD), General Services Administration (GSA), and National...

  14. Nonstationary Root Causes of Cobb’s Paradox

    DTIC Science & Technology

    2010-07-01

    AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) Defense Acquisition University...9820 Belvoir Road, Suite 3,Fort Belvoir,VA,22060-5565 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS...ES) 10. SPONSOR/MONITOR’S ACRONYM( S ) 11. SPONSOR/MONITOR’S REPORT NUMBER( S ) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release

  15. Integrated Baseline Review (IBR) Handbook

    NASA Technical Reports Server (NTRS)

    2013-01-01

    An Integrated Baseline Review (IBR) is a review of a supplier?s Performance Measurement Baseline (PMB). It is conducted by Program/Project Managers and their technical staffs on contracts and in-house work requiring compliance with NASA Earned Value Management System (EVMS) policy as defined in program/project policy, NPR 7120.5, or in NASA Federal Acquisition Regulations. The IBR Handbook may also be of use to those responsible for preparing the Terms of Reference for internal project reviews. While risks may be identified and actions tracked as a result of the IBR, it is important to note that an IBR cannot be failed.

  16. Performance Investigation of a Handheld 3d Scanner to Define Good Practices for Small Artefact 3d Modeling

    NASA Astrophysics Data System (ADS)

    Lachat, E.; Landes, T.; Grussenmeyer, P.

    2017-08-01

    Handheld 3D scanners can be used to complete large scale models with the acquisition of occluded areas or small artefacts. This may be of interest for digitization projects in the field of Cultural Heritage, where detailed areas may require a specific treatment. Such sensors present the advantage of being easily portable in the field, and easily usable even without particular knowledge. In this paper, the Freestyle3D handheld scanner launched on the market in 2015 by FARO is investigated. Different experiments are described, covering various topics such as the influence of range or color on the measurements, but also the precision achieved for geometrical primitive digitization. These laboratory experiments are completed by acquisitions performed on engraved and sculpted stone blocks. This practical case study is useful to investigate which acquisition protocol seems to be the more adapted and leads to precise results. The produced point clouds will be compared to photogrammetric surveys for the purpose of their accuracy assessment.

  17. Job Attitudes of AFSC (Air Force Systems Command) Acquisition Project Managers.

    DTIC Science & Technology

    1986-04-01

    for performance (3rd ed.). Homewood, IL: Irwin. Ajzen , 1. & Fishbein , M . (1977). Attitude-behavior relations: A theoretical analysis and review of...factors that may be influencing job attitudes. I X. Chapter One I NTRODUCTION Today, about 2000 Air Force members manage the acquisit ion of bi1lions of...ison.i .ncl I (’ate" Nt ro’ p 2ject ranager s and cther AFSC o tI c rs ha N.e s ie m a r - a t t ,.des, IL t their att itudes ai e lower compai ed to

  18. Respiratory motion guided four dimensional cone beam computed tomography: encompassing irregular breathing

    NASA Astrophysics Data System (ADS)

    O'Brien, Ricky T.; Cooper, Benjamin J.; Kipritidis, John; Shieh, Chun-Chien; Keall, Paul J.

    2014-02-01

    Four dimensional cone beam computed tomography (4DCBCT) images suffer from angular under sampling and bunching of projections due to a lack of feedback between the respiratory signal and the acquisition system. To address this problem, respiratory motion guided 4DCBCT (RMG-4DCBCT) regulates the gantry velocity and projection time interval, in response to the patient’s respiratory signal, with the aim of acquiring evenly spaced projections in a number of phase or displacement bins during the respiratory cycle. Our previous study of RMG-4DCBCT was limited to sinusoidal breathing traces. Here we expand on that work to provide a practical algorithm for the case of real patient breathing data. We give a complete description of RMG-4DCBCT including full details on how to implement the algorithms to determine when to move the gantry and when to acquire projections in response to the patient’s respiratory signal. We simulate a realistic working RMG-4DCBCT system using 112 breathing traces from 24 lung cancer patients. Acquisition used phase-based binning and parameter settings typically used on commercial 4DCBCT systems (4 min acquisition time, 1200 projections across 10 respiratory bins), with the acceleration and velocity constraints of current generation linear accelerators. We quantified streaking artefacts and image noise for conventional and RMG-4DCBCT methods by reconstructing projection data selected from an oversampled set of Catphan phantom projections. RMG-4DCBCT allows us to optimally trade-off image quality, acquisition time and image dose. For example, for the same image quality and acquisition time as conventional 4DCBCT approximately half the imaging dose is needed. Alternatively, for the same imaging dose, the image quality as measured by the signal to noise ratio, is improved by 63% on average. C-arm cone beam computed tomography systems, with an acceleration up to 200°/s2, a velocity up to 100°/s and the acquisition of 80 projections per second, allow the image acquisition time to be reduced to below 60 s. We have made considerable progress towards realizing a system to reduce projection clustering in conventional 4DCBCT imaging and hence reduce the imaging dose to the patient.

  19. Gravity Survey on the Glass Buttes Geothermal Exploration Project Lake County, Oregon

    DOE Data Explorer

    John Akerley

    2011-10-12

    This report covers data acquisition, instrumentation and processing of a gravity survey performed on the Glass Buttes Geothermal Exploration Project, located in Lake County, Oregon for ORMAT Technologies Inc. The survey was conducted during 21 June 2010 to 26 June 2010. The survey area is located in T23S, R21-23E and lies within the Glass Buttes, Hat Butte, and Potato Lake, Oregon 1:24,000 topographic sheets. A total of 180 gravity stations were acquired along five profile lines.

  20. Acquisition of Learning by Facilitating Academics (Project ALFA). Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    Augustin, Marc

    The Acquisition of Learning by Facilitating Academics (Project ALFA) was an Elementary and Secondary Education Act Title VII-funded project in its second year in 1993-94. The project operated at a high school in Brooklyn, and served 75 Haitian-speaking students of limited English proficiency with fewer than 5 years in an English-speaking school.…

  1. Migrating Legacy Systems in the Global Merger & Acquisition Environment

    ERIC Educational Resources Information Center

    Katerattanakul, Pairin; Kam, Hwee-Joo; Lee, James J.; Hong, Soongoo

    2009-01-01

    The MetaFrame system migration project at WorldPharma, while driven by merger and acquisition, had faced complexities caused by both technical challenges and organizational issues in the climate of uncertainties. However, WorldPharma still insisted on instigating this post-merger system migration project. This project served to (1) consolidate the…

  2. Eigenstandig lernende Schulerinnen und Schuler--Bericht uber ein empirisches Forschungsprojekt = Autonomous Learners--An Empirical Research Project.

    ERIC Educational Resources Information Center

    Beck, Erwin; And Others

    1991-01-01

    Presents results of an experiment enabling students to develop their own cognitive and metacognitive strategies to promote autonomous learning in mathematical problem solving, knowledge acquisition, and written composition. Explains that students dealt with models of teachers' and classmates' cognitive performances and monitored their own…

  3. Evaluating Student-Teacher Linkage Data in Teacher Incentive Fund (TIF) Sites: Acquisition, Verification, and System Development. The Harvesting Project

    ERIC Educational Resources Information Center

    Watson, Jeffery; Witham, Peter; St. Louis, Timothy

    2010-01-01

    The U.S. Department of Education Teacher Incentive Fund (TIF) seeks to transform education compensation systems so that principal and teacher performance (measured through classroom productivity measures) connects to compensation. Classroom-level productivity measures require robust student-teacher linkage data. Organizations such as the…

  4. Changes in the Nature and Structure of Work: Implications for Skill Requirements and Skill Formation.

    ERIC Educational Resources Information Center

    Bailey, Thomas

    Changes in the economy and the workplace are changing job skill requirements and the process of skill acquisition. A study analyzed occupational trends and projections, performed case studies of four industry sectors (apparel and textile, accounting, management consulting, and software development), and reviewed research on changing skill demands…

  5. Land cover classification for Puget Sound, 1974-1979

    NASA Technical Reports Server (NTRS)

    Eby, J. R.

    1981-01-01

    Digital analysis of LANDSAT data for land cover classification projects in the Puget Sound region is surveyed. Two early rural and urban land use classifications and their application are described. After acquisition of VICAR/IBIs software, another land use classification of the area was performed, and is described in more detail. Future applications are considered.

  6. Regridding reconstruction algorithm for real-time tomographic imaging

    PubMed Central

    Marone, F.; Stampanoni, M.

    2012-01-01

    Sub-second temporal-resolution tomographic microscopy is becoming a reality at third-generation synchrotron sources. Efficient data handling and post-processing is, however, difficult when the data rates are close to 10 GB s−1. This bottleneck still hinders exploitation of the full potential inherent in the ultrafast acquisition speed. In this paper the fast reconstruction algorithm gridrec, highly optimized for conventional CPU technology, is presented. It is shown that gridrec is a valuable alternative to standard filtered back-projection routines, despite being based on the Fourier transform method. In fact, the regridding procedure used for resampling the Fourier space from polar to Cartesian coordinates couples excellent performance with negligible accuracy degradation. The stronger dependence of the observed signal-to-noise ratio for gridrec reconstructions on the number of angular views makes the presented algorithm even superior to filtered back-projection when the tomographic problem is well sampled. Gridrec not only guarantees high-quality results but it provides up to 20-fold performance increase, making real-time monitoring of the sub-second acquisition process a reality. PMID:23093766

  7. Data acquisition system for segmented reactor antineutrino detector

    NASA Astrophysics Data System (ADS)

    Hons, Z.; Vlášek, J.

    2017-01-01

    This paper describes the data acquisition system used for data readout from the PMT channels of a segmented detector of reactor antineutrinos with active shielding. Theoretical approach to the data acquisition is described and two possible solutions using QDCs and digitizers are discussed. Also described are the results of the DAQ performance during routine data taking operation of DANSS. DANSS (Detector of the reactor AntiNeutrino based on Solid Scintillator) is a project aiming to measure a spectrum of reactor antineutrinos using inverse beta decay (IBD) in a plastic scintillator. The detector is located close to an industrial nuclear reactor core and is covered by passive and active shielding. It is expected to have about 15000 IBD interactions per day. Light from the detector is sensed by PMT and SiPM.

  8. 23 CFR 710.501 - Early acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Early acquisition. 710.501 Section 710.501 Highways... REAL ESTATE Property Acquisition Alternatives § 710.501 Early acquisition. (a) Real property... so based on program or project considerations. The State may undertake early acquisition for corridor...

  9. 23 CFR 710.501 - Early acquisition.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Early acquisition. 710.501 Section 710.501 Highways... REAL ESTATE Property Acquisition Alternatives § 710.501 Early acquisition. (a) Real property... so based on program or project considerations. The State may undertake early acquisition for corridor...

  10. Design of a highly integrated video acquisition module for smart video flight unit development

    NASA Astrophysics Data System (ADS)

    Lebre, V.; Gasti, W.

    2017-11-01

    CCD and APS devices are widely used in space missions as instrument sensors and/or in Avionics units like star detectors/trackers. Therefore, various and numerous designs of video acquisition chains have been produced. Basically, a classical video acquisition chain is constituted of two main functional blocks: the Proximity Electronics (PEC), including detector drivers and the Analogue Processing Chain (APC) Electronics that embeds the ADC, a master sequencer and the host interface. Nowadays, low power technologies allow to improve the integration, radiometric performances and power budget optimisation of video units and to standardize video units design and development. To this end, ESA has initiated a development activity through a competitive process requesting the expertise of experienced actors in the field of high resolution electronics for earth observation and Scientific missions. THALES ALENIA SPACE has been granted this activity as a prime contractor through ESA contract called HIVAC that holds for Highly Integrated Video Acquisition Chain. This paper presents main objectives of the on going HIVAC project and focuses on the functionalities and performances offered by the usage of the under development HIVAC board for future optical instruments.

  11. National Ignition Facility project acquisition plan revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clobes, A.R.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  12. Field data acquisition technologies for Iowa transportation agencies.

    DOT National Transportation Integrated Search

    1994-08-01

    This report describes the results of the research project investigating the use of : advanced field data acquisition technologies for lowa transponation agencies. The : objectives of the research project were to (1) research and evaluate current data...

  13. 48 CFR 434.004 - Acquisition strategy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....004 Section 434.004 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL... manager will develop, in coordination with the Acquisition Executive or Major Information Technology... approval of the Acquisition Executive or Major Information Technology Systems Executive, a project control...

  14. Evaluation of imaging quality for flat-panel detector based low dose C-arm CT system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seo, Chang-Woo; Cha, Bo Kyung; Jeon, Sungchae

    The image quality associated with the extent of the angle of gantry rotation, the number of projection views, and the dose of X-ray radiation was investigated in flat-panel detector (FPD) based C-arm cone-beam computed tomography (CBCT) system for medical applications. A prototype CBCT system for the projection acquisition used the X-ray tube (A-132, Varian inc.) having rhenium-tungsten molybdenum target and flat panel a-Si X-ray detector (PaxScan 4030CB, Varian inc.) having a 397 x 298 mm active area with 388 μm pixel pitch and 1024 x 768 pixels in 2 by 2 binning mode. The performance comparison of X-ray imaging qualitymore » was carried out using the Feldkamp, Davis, and Kress (FDK) reconstruction algorithm between different conditions of projection acquisition. In this work, head-and-dental (75 kVp/20 mA) and chest (90 kVp/25 mA) phantoms were used to evaluate the image quality. The 361 (30 fps x 12 s) projection data during 360 deg. gantry rotation with 1 deg. interval for the 3D reconstruction were acquired. Parke weighting function were applied to handle redundant data and improve the reconstructed image quality in a mobile C-arm system with limited rotation angles. The reconstructed 3D images were investigated for comparison of qualitative image quality in terms of scan protocols (projection views, rotation angles and exposure dose). Furthermore, the performance evaluation in image quality will be investigated regarding X-ray dose and limited projection data for a FPD based mobile C-arm CBCT system. (authors)« less

  15. Design and performance evaluation of a 20-aperture multipinhole collimator for myocardial perfusion imaging applications.

    PubMed

    Bowen, Jason D; Huang, Qiu; Ellin, Justin R; Lee, Tzu-Cheng; Shrestha, Uttam; Gullberg, Grant T; Seo, Youngho

    2013-10-21

    Single photon emission computed tomography (SPECT) myocardial perfusion imaging remains a critical tool in the diagnosis of coronary artery disease. However, after more than three decades of use, photon detection efficiency remains poor and unchanged. This is due to the continued reliance on parallel-hole collimators first introduced in 1964. These collimators possess poor geometric efficiency. Here we present the performance evaluation results of a newly designed multipinhole collimator with 20 pinhole apertures (PH20) for commercial SPECT systems. Computer simulations and numerical observer studies were used to assess the noise, bias and diagnostic imaging performance of a PH20 collimator in comparison with those of a low energy high resolution (LEHR) parallel-hole collimator. Ray-driven projector/backprojector pairs were used to model SPECT imaging acquisitions, including simulation of noiseless projection data and performing MLEM/OSEM image reconstructions. Poisson noise was added to noiseless projections for realistic projection data. Noise and bias performance were investigated for five mathematical cardiac and torso (MCAT) phantom anatomies imaged at two gantry orbit positions (19.5 and 25.0 cm). PH20 and LEHR images were reconstructed with 300 MLEM iterations and 30 OSEM iterations (ten subsets), respectively. Diagnostic imaging performance was assessed by a receiver operating characteristic (ROC) analysis performed on a single MCAT phantom; however, in this case PH20 images were reconstructed with 75 pixel-based OSEM iterations (four subsets). Four PH20 projection views from two positions of a dual-head camera acquisition and 60 LEHR projections were simulated for all studies. At uniformly-imposed resolution of 12.5 mm, significant improvements in SNR and diagnostic sensitivity (represented by the area under the ROC curve, or AUC) were realized when PH20 collimators are substituted for LEHR parallel-hole collimators. SNR improves by factors of 1.94-2.34 for the five patient anatomies and two orbital positions studied. For the ROC analysis the PH20 AUC is larger than the LEHR AUC with a p-value of 0.0067. Bias performance, however, decreases with the use of PH20 collimators. Systematic analyses showed PH20 collimators present improved diagnostic imaging performance over LEHR collimators, requiring only collimator exchange on existing SPECT cameras for their use.

  16. Design and performance evaluation of a 20-aperture multipinhole collimator for myocardial perfusion imaging applications

    NASA Astrophysics Data System (ADS)

    Bowen, Jason D.; Huang, Qiu; Ellin, Justin R.; Lee, Tzu-Cheng; Shrestha, Uttam; Gullberg, Grant T.; Seo, Youngho

    2013-10-01

    Single photon emission computed tomography (SPECT) myocardial perfusion imaging remains a critical tool in the diagnosis of coronary artery disease. However, after more than three decades of use, photon detection efficiency remains poor and unchanged. This is due to the continued reliance on parallel-hole collimators first introduced in 1964. These collimators possess poor geometric efficiency. Here we present the performance evaluation results of a newly designed multipinhole collimator with 20 pinhole apertures (PH20) for commercial SPECT systems. Computer simulations and numerical observer studies were used to assess the noise, bias and diagnostic imaging performance of a PH20 collimator in comparison with those of a low energy high resolution (LEHR) parallel-hole collimator. Ray-driven projector/backprojector pairs were used to model SPECT imaging acquisitions, including simulation of noiseless projection data and performing MLEM/OSEM image reconstructions. Poisson noise was added to noiseless projections for realistic projection data. Noise and bias performance were investigated for five mathematical cardiac and torso (MCAT) phantom anatomies imaged at two gantry orbit positions (19.5 and 25.0 cm). PH20 and LEHR images were reconstructed with 300 MLEM iterations and 30 OSEM iterations (ten subsets), respectively. Diagnostic imaging performance was assessed by a receiver operating characteristic (ROC) analysis performed on a single MCAT phantom; however, in this case PH20 images were reconstructed with 75 pixel-based OSEM iterations (four subsets). Four PH20 projection views from two positions of a dual-head camera acquisition and 60 LEHR projections were simulated for all studies. At uniformly-imposed resolution of 12.5 mm, significant improvements in SNR and diagnostic sensitivity (represented by the area under the ROC curve, or AUC) were realized when PH20 collimators are substituted for LEHR parallel-hole collimators. SNR improves by factors of 1.94-2.34 for the five patient anatomies and two orbital positions studied. For the ROC analysis the PH20 AUC is larger than the LEHR AUC with a p-value of 0.0067. Bias performance, however, decreases with the use of PH20 collimators. Systematic analyses showed PH20 collimators present improved diagnostic imaging performance over LEHR collimators, requiring only collimator exchange on existing SPECT cameras for their use.

  17. CO2 Acquisition Membrane (CAM) Project

    NASA Technical Reports Server (NTRS)

    Mason, Larry W.

    2003-01-01

    The CO2 Acquisition Membrane (CAM) project was performed to develop, test, and analyze thin film membrane materials for separation and purification of carbon dioxide (CO2) from mixtures of gases, such as those found in the Martian atmosphere. The membranes developed in this project are targeted toward In Situ Resource Utilization (ISRU) applications, such as In Situ Propellant Production (ISPP) and In Situ Consumables Production (ISCP). These membrane materials may be used in a variety of ISRU systems, for example as the atmospheric inlet filter for an ISPP process to enhance the concentration of CO2 for use as a reactant gas, to passively separate argon and nitrogen trace gases from CO2 for habitat pressurization, to provide a system for removal of CO2 from breathing gases in a closed environment, or within a process stream to selectively separate CO2 from other gaseous components. The membranes identified and developed for CAM were evaluated for use in candidate ISRU processes and other gas separation applications, and will help to lay the foundation for future unmanned sample return and human space missions. CAM is a cooperative project split among three institutions: Lockheed Martin Astronautics (LMA), the Colorado School of Mines (CSM), and Marshall Space Flight Center (MSFC).

  18. 77 FR 60281 - Regarding the Acquisition of Four U.S. Wind Farm Project Companies by Ralls Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... Acquisition of Four U.S. Wind Farm Project Companies by Ralls Corporation By the authority vested in me as... Pine City Windfarm, LLC (collectively, the Project Companies), all limited liability companies... Powers Act (50 U.S.C. 1701 et seq.), do not, in my judgment, provide adequate and appropriate authority...

  19. Estimating Logistics Burdens in Support of Acquisition Decisions

    DTIC Science & Technology

    2012-04-30

    Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law , no person shall be subject to a penalty...CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...ORGANIZATION NAME( S ) AND ADDRESS(ES) Naval Postgraduate School,Monterey,CA,93943 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING

  20. International Acquisition Programs: Variables Beyond Cost, Schedule and Performance

    DTIC Science & Technology

    2015-02-17

    Academy with a Bachelor of Science Degree in Human Factors Engineering and a Masters of Operational Art and Science from Air Command and Staff...Lt Col, USAF A Research Report Submitted to the Faculty In Partial Fulfillment of the Graduation Requirements Advisor: Col Kenneth Tatum 17...5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS

  1. Land Acquisition and Relocation Assistance for Airport Improvement Program (AIP) Assisted Projects

    DOT National Transportation Integrated Search

    2017-07-10

    This advisory circular (AC) provides guidance to sponsors of airport projects developed under the Airport Improvement Program (AIP) to meet the requirements of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Pl 9...

  2. OPTiM: Optical projection tomography integrated microscope using open-source hardware and software

    PubMed Central

    Andrews, Natalie; Davis, Samuel; Bugeon, Laurence; Dallman, Margaret D.; McGinty, James

    2017-01-01

    We describe the implementation of an OPT plate to perform optical projection tomography (OPT) on a commercial wide-field inverted microscope, using our open-source hardware and software. The OPT plate includes a tilt adjustment for alignment and a stepper motor for sample rotation as required by standard projection tomography. Depending on magnification requirements, three methods of performing OPT are detailed using this adaptor plate: a conventional direct OPT method requiring only the addition of a limiting aperture behind the objective lens; an external optical-relay method allowing conventional OPT to be performed at magnifications >4x; a remote focal scanning and region-of-interest method for improved spatial resolution OPT (up to ~1.6 μm). All three methods use the microscope’s existing incoherent light source (i.e. arc-lamp) and all of its inherent functionality is maintained for day-to-day use. OPT acquisitions are performed on in vivo zebrafish embryos to demonstrate the implementations’ viability. PMID:28700724

  3. Federal Motor Carrier Safety Administration’s advanced system testing utilizing a data acquisition system on the highways (FAST DASH) safety technology evaluation project #3 : novel convex mirrors.

    DOT National Transportation Integrated Search

    2016-11-01

    An independent evaluation of a set of novel prototype mirrors was conducted to determine whether the mirrors perform as well as traditional production mirrors across the basic functions of field of view (FOV), image distortion, and distance estimatio...

  4. Fort Berthold Library Literacy Program. Final Performance Report, October 1, 1988-September 30, 1989.

    ERIC Educational Resources Information Center

    Fort Berthold Reservation Public Library, New Town, ND.

    The report describes activities of the Fort Berthold Reservation Public Library (North Dakota) Literacy Program to meet six objectives for the 1988-89 project year. The program was designed specifically to promote literacy among three Native American tribes, the Mandan, Hidatsa, and Arikara. Objectives included acquisition of a library literacy…

  5. Space science technology: In-situ science. Sample Acquisition, Analysis, and Preservation Project summary

    NASA Technical Reports Server (NTRS)

    Aaron, Kim

    1991-01-01

    The Sample Acquisition, Analysis, and Preservation Project is summarized in outline and graphic form. The objective of the project is to develop component and system level technology to enable the unmanned collection, analysis and preservation of physical, chemical and mineralogical data from the surface of planetary bodies. Technology needs and challenges are identified and specific objectives are described.

  6. Guidance Oriented Acquisition of Learning Skills (Project GOALS). Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Musante, Patricia

    Guidance Oriented Acquisition of Learning Skills (Project GOALS) was a federally-funded project in three Brooklyn (New York) high schools in its fourth year of operation in 1992-93. It served 312 limited-English-proficient and 57 English-proficient students through instruction in English as a Second Language (ESL), native language arts (NLA) in…

  7. 43 CFR 8.0 - Acquisition of lands for reservoir projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... 8.0 Section 8.0 Public Lands: Interior Office of the Secretary of the Interior JOINT POLICIES OF THE DEPARTMENTS OF THE INTERIOR AND OF THE ARMY RELATIVE TO RESERVOIR PROJECT LANDS § 8.0 Acquisition of lands for reservoir projects. In so far as permitted by law, it is the policy of the Departments of the Interior and...

  8. Acquisition of Learning by Facilitating Academics (Project ALFA). Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Bruno, Paula

    This report assesses the Acquisition of Learning by Facilitating Academics (Project ALFA), which is designed to assist the academic progress of Haitian students at Lafayette High School in Brooklyn, New York. Project ALFA served a total of 62 students of limited English proficiency who had attended an English-speaking school system for less than 5…

  9. 32 CFR 644.7 - Acquisition lines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... HANDBOOK Project Planning Civil Works § 644.7 Acquisition lines. (a) Tentative acquisition lines. As..., in accordance with sound real estate practices. Accordingly, fringe tracts will not be acquired until...

  10. Navigator GPS Receiver for Fast Acquisition and Weak Signal Space Applications

    NASA Technical Reports Server (NTRS)

    Winternitz, Luke; Moreau, Michael; Boegner, Gregory J.; Sirotzky, Steve

    2004-01-01

    NASA Goddard Space Flight Center (GSFC) is developing a new space-borne GPS receiver that can operate effectively in the full range of Earth orbiting missions from Low Earth Orbit (LEO) to geostationary and beyond. Navigator is designed to be a fully space flight qualified GPS receiver optimized for fast signal acquisition and weak signal tracking. The fast acquisition capabilities provide exceptional time to first fix performance (TIFF) with no a priori receiver state or GPS almanac information, even in the presence of high Doppler shifts present in LEO (or near perigee in highly eccentric orbits). The fast acquisition capability also makes it feasible to implement extended correlation intervals and therefore significantly reduce Navigator s acquisition threshold. This greatly improves GPS observability when the receiver is above the GPS constellation (and satellites must be tracked from the opposite side of the Earth) by providing at least 10 dB of increased acquisition sensitivity. Fast acquisition and weak signal tracking algorithms have been implemented and validated on a hardware development board. A fully functional version of the receiver, employing most of the flight parts, with integrated navigation software is expected by mid 2005. An ultimate goal of this project is to license the Navigator design to an industry partner who will then market the receiver as a commercial product.

  11. Helium-3 MR q-space imaging with radial acquisition and iterative highly constrained back-projection.

    PubMed

    O'Halloran, Rafael L; Holmes, James H; Wu, Yu-Chien; Alexander, Andrew; Fain, Sean B

    2010-01-01

    An undersampled diffusion-weighted stack-of-stars acquisition is combined with iterative highly constrained back-projection to perform hyperpolarized helium-3 MR q-space imaging with combined regional correction of radiofrequency- and T1-related signal loss in a single breath-held scan. The technique is tested in computer simulations and phantom experiments and demonstrated in a healthy human volunteer with whole-lung coverage in a 13-sec breath-hold. Measures of lung microstructure at three different lung volumes are evaluated using inhaled gas volumes of 500 mL, 1000 mL, and 1500 mL to demonstrate feasibility. Phantom results demonstrate that the proposed technique is in agreement with theoretical values, as well as with a fully sampled two-dimensional Cartesian acquisition. Results from the volunteer study demonstrate that the root mean squared diffusion distance increased significantly from the 500-mL volume to the 1000-mL volume. This technique represents the first demonstration of a spatially resolved hyperpolarized helium-3 q-space imaging technique and shows promise for microstructural evaluation of lung disease in three dimensions. Copyright (c) 2009 Wiley-Liss, Inc.

  12. Robotic acquisition programs: technical and performance challenges

    NASA Astrophysics Data System (ADS)

    Thibadoux, Steven A.

    2002-07-01

    The Unmanned Ground Vehicles/ Systems Joint Project Office (UGV/S JPO) is developing and fielding a variety of tactical robotic systems for the Army and Marine Corps. The Standardized Robotic System (SRS) provides a family of common components that can be installed in existing military vehicles, to allow unmanned operation of the vehicle and its payloads. The Robotic Combat Support System (RCSS) will be a medium sized unmanned system with interchangeable attachments, allowing a remote operator to perform a variety of engineering tasks. The Gladiator Program is a USMC initiative for a small to medium sized, highly mobile UGV to conduct scout/ surveillance missions and to carry various lethal and non-lethal payloads. Acquisition plans for these programs require preplanned evolutionary block upgrades to add operational capability, as new technology becomes available. This paper discusses technical and performance issues that must be resolved and the enabling technologies needed for near term block upgrades of these first generation robotic systems. Additionally, two Joint Robotics Program (JRP) initiatives, Robotic Acquisition through Virtual Environments and Networked Simulations (RAVENS) and Joint Architecture for Unmanned Ground Systems (JAUGS), will be discussed. RAVENS and JAUGS will be used to efficiently evaluate and integrate new technologies to be incorporated in system upgrades.

  13. Optimization and comparison of simultaneous and separate acquisition protocols for dual isotope myocardial perfusion SPECT.

    PubMed

    Ghaly, Michael; Links, Jonathan M; Frey, Eric C

    2015-07-07

    Dual-isotope simultaneous-acquisition (DISA) rest-stress myocardial perfusion SPECT (MPS) protocols offer a number of advantages over separate acquisition. However, crosstalk contamination due to scatter in the patient and interactions in the collimator degrade image quality. Compensation can reduce the effects of crosstalk, but does not entirely eliminate image degradations. Optimizing acquisition parameters could further reduce the impact of crosstalk. In this paper we investigate the optimization of the rest Tl-201 energy window width and relative injected activities using the ideal observer (IO), a realistic digital phantom population and Monte Carlo (MC) simulated Tc-99m and Tl-201 projections as a means to improve image quality. We compared performance on a perfusion defect detection task for Tl-201 acquisition energy window widths varying from 4 to 40 keV centered at 72 keV for a camera with a 9% energy resolution. We also investigated 7 different relative injected activities, defined as the ratio of Tc-99m and Tl-201 activities, while keeping the total effective dose constant at 13.5 mSv. For each energy window and relative injected activity, we computed the IO test statistics using a Markov chain Monte Carlo (MCMC) method for an ensemble of 1,620 triplets of fixed and reversible defect-present, and defect-absent noisy images modeling realistic background variations. The volume under the 3-class receiver operating characteristic (ROC) surface (VUS) was estimated and served as the figure of merit. For simultaneous acquisition, the IO suggested that relative Tc-to-Tl injected activity ratios of 2.6-5 and acquisition energy window widths of 16-22% were optimal. For separate acquisition, we observed a broad range of optimal relative injected activities from 2.6 to 12.1 and acquisition energy window of widths 16-22%. A negative correlation between Tl-201 injected activity and the width of the Tl-201 energy window was observed in these ranges. The results also suggested that DISA methods could potentially provide image quality as good as that obtained with separate acquisition protocols. We compared observer performance for the optimized protocols and the current clinical protocol using separate acquisition. The current clinical protocols provided better performance at a cost of injecting the patient with approximately double the injected activity of Tc-99m and Tl-201, resulting in substantially increased radiation dose.

  14. Single-Shot X-Ray Phase-Contrast Computed Tomography with Nonmicrofocal Laboratory Sources

    NASA Astrophysics Data System (ADS)

    Diemoz, P. C.; Hagen, C. K.; Endrizzi, M.; Minuti, M.; Bellazzini, R.; Urbani, L.; De Coppi, P.; Olivo, A.

    2017-04-01

    We present a method that enables performing x-ray phase-contrast imaging (XPCI) computed tomography with a laboratory setup using a single image per projection angle, eliminating the need to move optical elements during acquisition. Theoretical derivation of the method is presented, and its validity conditions are provided. The object is assumed to be quasihomogeneous, i.e., to feature a ratio between the refractive index and the linear attenuation coefficient that is approximately constant across the field of view. The method is experimentally demonstrated on a plastics phantom and on biological samples using a continuous rotation acquisition scheme achieving scan times of a few minutes. Moreover, we show that such acquisition times can be further reduced with the use of a high-efficiency photon-counting detector. Thanks to its ability to substantially simplify the image-acquisition procedure and greatly reduce collection times, we believe this method represents a very important step towards the application of XPCI to real-world problems.

  15. A compiler and validator for flight operations on NASA space missions

    NASA Astrophysics Data System (ADS)

    Fonte, Sergio; Politi, Romolo; Capria, Maria Teresa; Giardino, Marco; De Sanctis, Maria Cristina

    2016-07-01

    In NASA missions the management and the programming of the flight systems is performed by a specific scripting language, the SASF (Spacecraft Activity Sequence File). In order to perform a check on the syntax and grammar it is necessary a compiler that stress the errors (eventually) found in the sequence file produced for an instrument on board the flight system. In our experience on Dawn mission, we developed VIRV (VIR Validator), a tool that performs checks on the syntax and grammar of SASF, runs a simulations of VIR acquisitions and eventually finds violation of the flight rules of the sequences produced. The project of a SASF compiler (SSC - Spacecraft Sequence Compiler) is ready to have a new implementation: the generalization for different NASA mission. In fact, VIRV is a compiler for a dialect of SASF; it includes VIR commands as part of SASF language. Our goal is to produce a general compiler for the SASF, in which every instrument has a library to be introduced into the compiler. The SSC can analyze a SASF, produce a log of events, perform a simulation of the instrument acquisition and check the flight rules for the instrument selected. The output of the program can be produced in GRASS GIS format and may help the operator to analyze the geometry of the acquisition.

  16. Design of Smart-Meter data acquisition device based on Cloud Platform

    NASA Astrophysics Data System (ADS)

    Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng

    2018-05-01

    In recent years, the government has attached great importance to ‘Four-Meter Unified’ Project. Under the call of national policy, State Grid is participate in building ‘Four-Meter Unified’ Project actively by making use of electricity information acquisition system. In this paper, a new type Smart-Meter data acquisition device based on Cloud Platform is designed according to the newest series of standards Energy Measure and Management System for Electric, Water, Gas and Heat Meter, and this paper introduces the general scheme, main hardware design and main software design for the Smart-Meter data acquisition device.

  17. Accelerated Optical Projection Tomography Applied to In Vivo Imaging of Zebrafish

    PubMed Central

    Correia, Teresa; Yin, Jun; Ramel, Marie-Christine; Andrews, Natalie; Katan, Matilda; Bugeon, Laurence; Dallman, Margaret J.; McGinty, James; Frankel, Paul; French, Paul M. W.; Arridge, Simon

    2015-01-01

    Optical projection tomography (OPT) provides a non-invasive 3-D imaging modality that can be applied to longitudinal studies of live disease models, including in zebrafish. Current limitations include the requirement of a minimum number of angular projections for reconstruction of reasonable OPT images using filtered back projection (FBP), which is typically several hundred, leading to acquisition times of several minutes. It is highly desirable to decrease the number of required angular projections to decrease both the total acquisition time and the light dose to the sample. This is particularly important to enable longitudinal studies, which involve measurements of the same fish at different time points. In this work, we demonstrate that the use of an iterative algorithm to reconstruct sparsely sampled OPT data sets can provide useful 3-D images with 50 or fewer projections, thereby significantly decreasing the minimum acquisition time and light dose while maintaining image quality. A transgenic zebrafish embryo with fluorescent labelling of the vasculature was imaged to acquire densely sampled (800 projections) and under-sampled data sets of transmitted and fluorescence projection images. The under-sampled OPT data sets were reconstructed using an iterative total variation-based image reconstruction algorithm and compared against FBP reconstructions of the densely sampled data sets. To illustrate the potential for quantitative analysis following rapid OPT data acquisition, a Hessian-based method was applied to automatically segment the reconstructed images to select the vasculature network. Results showed that 3-D images of the zebrafish embryo and its vasculature of sufficient visual quality for quantitative analysis can be reconstructed using the iterative algorithm from only 32 projections—achieving up to 28 times improvement in imaging speed and leading to total acquisition times of a few seconds. PMID:26308086

  18. 48 CFR 1552.227-76 - Project employee confidentiality agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Project employee confidentiality agreement. 1552.227-76 Section 1552.227-76 Federal Acquisition Regulations System ENVIRONMENTAL... electrical services, provisions which shall conform substantially to the language of this clause, including...

  19. 48 CFR 1552.227-76 - Project employee confidentiality agreement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Project employee confidentiality agreement. 1552.227-76 Section 1552.227-76 Federal Acquisition Regulations System ENVIRONMENTAL... electrical services, provisions which shall conform substantially to the language of this clause, including...

  20. 48 CFR 1552.227-76 - Project employee confidentiality agreement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Project employee confidentiality agreement. 1552.227-76 Section 1552.227-76 Federal Acquisition Regulations System ENVIRONMENTAL... electrical services, provisions which shall conform substantially to the language of this clause, including...

  1. 48 CFR 1552.227-76 - Project employee confidentiality agreement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Project employee confidentiality agreement. 1552.227-76 Section 1552.227-76 Federal Acquisition Regulations System ENVIRONMENTAL... electrical services, provisions which shall conform substantially to the language of this clause, including...

  2. 14 CFR 151.73 - Land acquisition.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Land acquisition. 151.73 Section 151.73 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming Standards § 151.73 Land acquisition. (a) The acquisition of...

  3. 14 CFR 151.73 - Land acquisition.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Land acquisition. 151.73 Section 151.73 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming Standards § 151.73 Land acquisition. (a) The acquisition of...

  4. 14 CFR 151.73 - Land acquisition.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Land acquisition. 151.73 Section 151.73 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming Standards § 151.73 Land acquisition. (a) The acquisition of...

  5. 14 CFR 151.73 - Land acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Land acquisition. 151.73 Section 151.73 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming Standards § 151.73 Land acquisition. (a) The acquisition of...

  6. 14 CFR 151.73 - Land acquisition.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Land acquisition. 151.73 Section 151.73 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming Standards § 151.73 Land acquisition. (a) The acquisition of...

  7. Final Environmental Assessment for Proposed Colorado Springs Airport/El Paso County School District 11 Property Acquisition and Future Development at Peterson Air Foce Base, Colorado

    DTIC Science & Technology

    2011-02-01

    PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) AMEC Earth and Environmental, Inc,104 W Anapamu...St Ste 204a,San Barbara,CA,93101 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR...National Ambient Air Quality Standards [NAAQS]). The USEPA require the proponent of a proposed action to perform an analysis to determine if its

  8. A Low-Cost Data Acquisition System for Automobile Dynamics Applications

    PubMed Central

    González, Alejandro; Vinolas, Jordi

    2018-01-01

    This project addresses the need for the implementation of low-cost acquisition technology in the field of vehicle engineering: the design, development, manufacture, and verification of a low-cost Arduino-based data acquisition platform to be used in <80 Hz data acquisition in vehicle dynamics, using low-cost accelerometers. In addition to this, a comparative study is carried out of professional vibration acquisition technologies and low-cost systems, obtaining optimum results for low- and medium-frequency operations with an error of 2.19% on road tests. It is therefore concluded that these technologies are applicable to the automobile industry, thereby allowing the project costs to be reduced and thus facilitating access to this kind of research that requires limited resources. PMID:29382039

  9. A Low-Cost Data Acquisition System for Automobile Dynamics Applications.

    PubMed

    González, Alejandro; Olazagoitia, José Luis; Vinolas, Jordi

    2018-01-27

    This project addresses the need for the implementation of low-cost acquisition technology in the field of vehicle engineering: the design, development, manufacture, and verification of a low-cost Arduino-based data acquisition platform to be used in <80 Hz data acquisition in vehicle dynamics, using low-cost accelerometers. In addition to this, a comparative study is carried out of professional vibration acquisition technologies and low-cost systems, obtaining optimum results for low- and medium-frequency operations with an error of 2.19% on road tests. It is therefore concluded that these technologies are applicable to the automobile industry, thereby allowing the project costs to be reduced and thus facilitating access to this kind of research that requires limited resources.

  10. Breadboard stellar tracker system test report, volume 1

    NASA Technical Reports Server (NTRS)

    Kollodge, J. C.; Hubbard, M. W.; Jain, S.; Schons, C. A.

    1981-01-01

    The performance of a star tracker equipped with a focal plane detector was evaluated. The CID board is an array of 256 x 256 pixels which are 20 x 20 micrometers in dimension. The tracker used for test was a breadboard tracker system developed by BASD. Unique acquisition and tracking algorithms are employed to enhance performance. A pattern recognition process is used to test for proper image spread function and to avoid false acquisition on noise. A very linear, high gain, interpixel transfer function is derived for interpolating star position. The lens used in the tracker has an EFL of 100 mm. The tracker has an FOV of 2.93 degrees resulting in a pixel angular subtense of 41.253 arc sec in each axis. The test procedure used for the program presented a star to the tracker in a circular pattern of positions; the pattern was formed by projecting a simulated star through a rotatable deviation wedge. Further tests determined readout noise, Noise Equivalent Displacement during track, and spatial noise during acquisition by taking related data and reducing it.

  11. 32 CFR 644.7 - Acquisition lines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Acquisition lines. 644.7 Section 644.7 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.7 Acquisition lines. (a) Tentative acquisition lines. As...

  12. Development of a Data Acquisition System for Unmanned Aerial Vehicle (UAV) System Identification

    NASA Astrophysics Data System (ADS)

    Lear, Donald Joseph

    Aircraft system identification techniques are developed for fixed wing Unmanned Aerial Vehicles (UAV). The use of a designed flight experiment with measured system inputs/outputs can be used to derive aircraft stability derivatives. This project set out to develop a methodology to support an experiment to model pitch damping in the longitudinal short-period mode of a UAV. A Central Composite Response Surface Design was formed using angle of attack and power levels as factors to test for the pitching moment coefficient response induced by a multistep pitching maneuver. Selecting a high-quality data acquisition platform was critical to the success of the project. This system was designed to support fixed wing research through the addition of a custom air data vane capable of measuring angle of attack and sideslip, as well as an airspeed sensor. A Pixhawk autopilot system serves as the core and modification of the device firmware allowed for the integration of custom sensors and custom RC channels dedicated to performing system identification maneuvers. Tests were performed on all existing Pixhawk sensors to validate stated uncertainty values. The air data system was calibrated in a low speed wind tunnel and dynamic performance was verified. The assembled system was then installed in a commercially available UAV known as an Air Titan FPV in order to test the Pixhawk's automated flight maneuvers and determine the final performance of each sensor. Flight testing showed all the critical sensors produced acceptable data for further research. The Air Titan FPV airframe was found to be very flexible and did not lend itself well to accurate measurement of inertial properties. This realization prohibited the construction of the required math models for longitudinal dynamics. It is recommended that future projects using the developed methods choose an aircraft with a more rigid airframe.

  13. Learner Background and the Acquisition of Discourse Features of Korean in the Australian Secondary School Context

    ERIC Educational Resources Information Center

    Kim, Sun Hee Ok

    2012-01-01

    This paper explores how learner background shapes learner performance on discourse features in writing by analysing data produced as part of the Student Achievement in Asian Languages Education project (Scarino et al., 2011) by Year 10 (mid-secondary school) students learning Korean as a foreign or heritage language. Five participants were in…

  14. When Performance Is the Product: Problems in the Analysis of Online Distance Education

    ERIC Educational Resources Information Center

    Hamilton, David; Dahlgren, Ethel; Hult, Agneta; Roos, Bertil; Soderstrom, Tor

    2004-01-01

    This article examines two ideologies that have been prominent in recent, if not current, education thinking. The first is that means can be separated from ends (or processes from products); the second is that learning is merely a process of knowledge acquisition. Attention to these ideologies arises from two projects in the overlapping fields of…

  15. History of Concurrency. The Controversy of Military Acquisition Program Schedule Compression

    DTIC Science & Technology

    1986-09-01

    33 The Manhattan Project . ........... 35 Post-War Acquisition . . . . ...... 40 The Lockheed Skunk Works ........ 42 iii Era of Controversy...been involved Vin the Manhattan Project (47:55). The concurrency concept and the innovative foundation of the Air Force Ballistic Missile Program...inter- F4 continental oallistic missile. To snorten the program’s development time they drew upon lessons from the Manhattan Project and made three

  16. Design and Development of a New Multi-Projection X-Ray System for Chest Imaging

    NASA Astrophysics Data System (ADS)

    Chawla, Amarpreet S.; Boyce, Sarah; Washington, Lacey; McAdams, H. Page; Samei, Ehsan

    2009-02-01

    Overlapping anatomical structures may confound the detection of abnormal pathology, including lung nodules, in conventional single-projection chest radiography. To minimize this fundamental limiting factor, a dedicated digital multi-projection system for chest imaging was recently developed at the Radiology Department of Duke University. We are reporting the design of the multi-projection imaging system and its initial performance in an ongoing clinical trial. The system is capable of acquiring multiple full-field projections of the same patient along both the horizontal and vertical axes at variable speeds and acquisition frame rates. These images acquired in rapid succession from slightly different angles about the posterior-anterior (PA) orientation can be correlated to minimize the influence of overlying anatomy. The developed system has been tested for repeatability and motion blur artifacts to investigate its robustness for clinical trials. Excellent geometrical consistency was found in the tube motion, with positional errors for clinical settings within 1%. The effect of tube-motion on the image quality measured in terms of impact on the modulation transfer function (MTF) was found to be minimal. The system was deemed clinic-ready and a clinical trial was subsequently launched. The flexibility of image acquisition built into the system provides a unique opportunity to easily modify it for different clinical applications, including tomosynthesis, correlation imaging (CI), and stereoscopic imaging.

  17. Systems Engineering of Unmanned DoD Systems: Following the Joint Capabilities Integration and Development System/Defense Acquisition System Process to Develop an Unmanned Ground Vehicle System

    DTIC Science & Technology

    2015-12-01

    Manual D-A-1). APAs are “Performance attributes of a system not important enough to be considered KPPs or KSAs, but still appropriate to include in...the CDD or CPD are designated as APAs ” (JCIDS Manual D-A-1). The requirements are expressed using Thresholds (T) and Objectives (O). “Performance...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA SYSTEMS ENGINEERING CAPSTONE PROJECT REPORT Approved for public release; distribution is

  18. Joint Test Project Report of Combat Air Support Target Acquisition Program. SEEKVAL. Project IA2. Direct Visual Imagery Experiments.

    DTIC Science & Technology

    1975-01-01

    Mission Zero Briefing Information ... ....... 1-A-8 Mission Zero Preflight Taped Coiments . . . 1-A-lO Mission Zero Inflight Events and Commentary . l-A...acquisitions between MAR and the target and zero range for non-acquisitions. AA 1 ... , ; "~...,, X0 ..o", xix S w...target from 35,000 feet to zero feet at nadir. If the inter-target interval was less than 35,000 feet, the device started counting on the new target

  19. Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to managemore » and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.« less

  20. The Specification of Cortical Subcerebral Projection Neurons Depends on the Direct Repression of TBR1 by CTIP1/BCL11a.

    PubMed

    Cánovas, José; Berndt, F Andrés; Sepúlveda, Hugo; Aguilar, Rodrigo; Veloso, Felipe A; Montecino, Martín; Oliva, Carlos; Maass, Juan C; Sierralta, Jimena; Kukuljan, Manuel

    2015-05-13

    The acquisition of distinct neuronal fates is fundamental for the function of the cerebral cortex. We find that the development of subcerebral projections from layer 5 neurons in the mouse neocortex depends on the high levels of expression of the transcription factor CTIP1; CTIP1 is coexpressed with CTIP2 in neurons that project to subcerebral targets and with SATB2 in those that project to the contralateral cortex. CTIP1 directly represses Tbr1 in layer 5, which appears as a critical step for the acquisition of the subcerebral fate. In contrast, lower levels of CTIP1 in layer 6 are required for TBR1 expression, which directs the corticothalamic fate. CTIP1 does not appear to play a critical role in the acquisition of the callosal projection fate in layer 5. These findings unravel a key step in the acquisition of cell fate for closely related corticofugal neurons and indicate that differential dosages of transcriptions factors are critical to specify different neuronal identities. Copyright © 2015 the authors 0270-6474/15/357552-13$15.00/0.

  1. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  2. Investigation of a Combined Surveying and Scanning Device: The Trimble SX10 Scanning Total Station

    PubMed Central

    Lachat, Elise; Landes, Tania; Grussenmeyer, Pierre

    2017-01-01

    Surveying fields from geosciences to infrastructure monitoring make use of a wide range of instruments for accurate 3D geometry acquisition. In many cases, the Terrestrial Laser Scanner (TLS) tends to become an optimal alternative to total station measurements thanks to the high point acquisition rate it offers, but also to ever deeper data processing software functionalities. Nevertheless, traditional surveying techniques are valuable in some kinds of projects. Nowadays, a few modern total stations combine their conventional capabilities with those of a laser scanner in a unique device. The recent Trimble SX10 scanning total station is a survey instrument merging high-speed 3D scanning and the capabilities of an image-assisted total station. In this paper this new instrument is introduced and first compared to state-of-the-art image-assisted total stations. The paper also addresses the topic of various laser scanning projects and the delivered point clouds are compared with those of other TLS. Directly and indirectly georeferenced projects have been carried out and are investigated in this paper, and a polygonal traverse is performed through a building. Comparisons with the results delivered by well-established survey instruments show the reliability of the Trimble SX10 for geodetic work as well as for scanning projects. PMID:28362319

  3. Crawler Acquisition and Testing Demonstration Project Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEFIGH-PRICE, C.

    2000-10-23

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less

  4. Data Acquisition and Mass Storage

    NASA Astrophysics Data System (ADS)

    Vande Vyvre, P.

    2004-08-01

    The experiments performed at supercolliders will constitute a new challenge in several disciplines of High Energy Physics and Information Technology. This will definitely be the case for data acquisition and mass storage. The microelectronics, communication, and computing industries are maintaining an exponential increase of the performance of their products. The market of commodity products remains the largest and the most competitive market of technology products. This constitutes a strong incentive to use these commodity products extensively as components to build the data acquisition and computing infrastructures of the future generation of experiments. The present generation of experiments in Europe and in the US already constitutes an important step in this direction. The experience acquired in the design and the construction of the present experiments has to be complemented by a large R&D effort executed with good awareness of industry developments. The future experiments will also be expected to follow major trends of our present world: deliver physics results faster and become more and more visible and accessible. The present evolution of the technologies and the burgeoning of GRID projects indicate that these trends will be made possible. This paper includes a brief overview of the technologies currently used for the different tasks of the experimental data chain: data acquisition, selection, storage, processing, and analysis. The major trends of the computing and networking technologies are then indicated with particular attention paid to their influence on the future experiments. Finally, the vision of future data acquisition and processing systems and their promise for future supercolliders is presented.

  5. Civilian Radioactive Waste Management System Requirements Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.« less

  6. Costing Future Complex and Novel Projects

    DTIC Science & Technology

    2016-04-30

    qÜáêíÉÉåíÜ=^ååì~ä= ^Åèìáëáíáçå=oÉëÉ~êÅÜ= póãéçëáìã= qÜìêëÇ~ó=pÉëëáçåë= sçäìãÉ=ff= = Costing Future Complex & Novel Projects Michael Pryce, Centre for Defence ...Novel Projects Michael Pryce, Centre for Defence Acquisition, Cranfield University Controlling Costs: The 6-3-5 Method—Case Studies at NAVSEA and...a Lecturer in defence acquisition at Cranfield University. He teaches across a range of subjects, including the use of costing in acquisition and

  7. Differential Die-Away Instrument: Report on Fuel Assembly Mock-up Measurements with Neutron Generator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodsell, Alison Victoria; Swinhoe, Martyn Thomas; Henzl, Vladimir

    2014-09-18

    Fresh fuel experiments for the differential die-away (DDA) project were performed using a DT neutron generator, a 15x15 PWR fuel assembly, and nine 3He detectors in a water tank inside of a shielded cell at Los Alamos National Laboratory (LANL). Eight different fuel enrichments were created using low enriched (LEU) and depleted uranium (DU) dioxide fuel rods. A list-mode data acquisition system recorded the time-dependent signal and analysis of the DDA signal die-away time was performed. The die-away time depended on the amount of fissile material in the fuel assembly and the position of the detector. These experiments were performedmore » in support of the spent nuclear fuel Next Generation Safeguards Initiative DDA project. Lessons learned from the fresh fuel DDA instrument experiments and simulations will provide useful information to the spent fuel project.« less

  8. Literacy Acquisition through Literature (Literacy Issues in Focus).

    ERIC Educational Resources Information Center

    Langer, Judith A.

    1997-01-01

    Discusses a project and study that focused on literacy acquisition among middle school students from the Dominican Republic attending a school on Manhattan's lower East Side. Describes how a book writing project focusing on "stories from home" engaged students, taught them ways to discuss and ways to think, and fostered their literacy acquisition…

  9. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2010-01-01

    NASA's Constellation Program includes the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, are manned space vehicles while the third element is broader and includes several sub-elements including Rovers and a Lunar Habitat. The upcoming planned missions involving these systems and vehicles include several risks and design challenges. Due to the unique thermal environment, many of these risks and challenges are associated with the vehicles' thermal control system. NASA's Exploration Systems Mission Directorate (ESMD) includes the Exploration Technology Development Program (ETDP). ETDP consists of several technology development projects. The project chartered with mitigating the aforementioned risks and design challenges is the Thermal Control System Development for Exploration Project. The risks and design challenges are addressed through a rigorous technology development process that culminates with an integrated thermal control system test. The resulting hardware typically has a Technology Readiness Level (TRL) of six. This paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing assessments for thermal control system fluids.

  10. 49 CFR 1180.0 - Scope and purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF TRANSPORTATION RULES OF PRACTICE RAILROAD ACQUISITION, CONTROL, MERGER, CONSOLIDATION PROJECT, TRACKAGE RIGHTS, AND LEASE PROCEDURES General Acquisition Procedures § 1180.0 Scope and purpose. (a... followed in control, merger, acquisition, lease, trackage rights, and any other consolidation transaction...

  11. Optimization and comparison of simultaneous and separate acquisition protocols for dual isotope myocardial perfusion SPECT

    PubMed Central

    Ghaly, Michael; Links, Jonathan M; Frey, Eric C

    2015-01-01

    Dual-isotope simultaneous-acquisition (DISA) rest-stress myocardial perfusion SPECT (MPS) protocols offer a number of advantages over separate acquisition. However, crosstalk contamination due to scatter in the patient and interactions in the collimator degrade image quality. Compensation can reduce the effects of crosstalk, but does not entirely eliminate image degradations. Optimizing acquisition parameters could further reduce the impact of crosstalk. In this paper we investigate the optimization of the rest Tl-201 energy window width and relative injected activities using the ideal observer (IO), a realistic digital phantom population and Monte Carlo (MC) simulated Tc-99m and Tl-201 projections as a means to improve image quality. We compared performance on a perfusion defect detection task for Tl-201 acquisition energy window widths varying from 4 to 40 keV centered at 72 keV for a camera with a 9% energy resolution. We also investigated 7 different relative injected activities, defined as the ratio of Tc-99m and Tl-201 activities, while keeping the total effective dose constant at 13.5 mSv. For each energy window and relative injected activity, we computed the IO test statistics using a Markov chain Monte Carlo (MCMC) method for an ensemble of 1,620 triplets of fixed and reversible defect-present, and defect-absent noisy images modeling realistic background variations. The volume under the 3-class receiver operating characteristic (ROC) surface (VUS) was estimated and served as the figure of merit. For simultaneous acquisition, the IO suggested that relative Tc-to-Tl injected activity ratios of 2.6–5 and acquisition energy window widths of 16–22% were optimal. For separate acquisition, we observed a broad range of optimal relative injected activities from 2.6 to 12.1 and acquisition energy window of widths 16–22%. A negative correlation between Tl-201 injected activity and the width of the Tl-201 energy window was observed in these ranges. The results also suggested that DISA methods could potentially provide image quality as good as that obtained with separate acquisition protocols. We compared observer performance for the optimized protocols and the current clinical protocol using separate acquisition. The current clinical protocols provided better performance at a cost of injecting the patient with approximately double the injected activity of Tc-99m and Tl-201, resulting in substantially increased radiation dose. PMID:26083239

  12. A mathematical model approach toward combining information from multiple image projections of the same patient

    NASA Astrophysics Data System (ADS)

    Chawla, Amarpreet S.; Samei, Ehsan; Abbey, Craig

    2007-03-01

    In this study, we used a mathematical observer model to combine information obtained from multiple angular projections of the same breast to determine the overall detection performance of a multi-projection breast imaging system in detectability of a simulated mass. 82 subjects participated in the study and 25 angular projections of each breast were acquired. Projections from a simulated 3 mm 3-D lesion were added to the projection images. The lesion was assumed to be embedded in the compressed breast at a distance of 3 cm from the detector. Hotelling observer with Laguerre-Gauss channels (LG CHO) was applied to each image. Detectability was analyzed in terms of ROC curves and the area under ROC curves (AUC). The critical question studied is how to best integrate the individual decision variables across multiple (correlated) views. Towards that end, three different methods were investigated. Specifically, 1) ROCs from different projections were simply averaged; 2) the test statistics from different projections were averaged; and 3) a Bayesian decision fusion rule was used. Finally, AUC of the combined ROC was used as a parameter to optimize the acquisition parameters to maximize the performance of the system. It was found that the Bayesian decision fusion technique performs better than the other two techniques and likely offers the best approximation of the diagnostic process. Furthermore, if the total dose level is held constant at 1/25th of dual-view mammographic screening dose, the highest detectability performance is observed when considering only two projections spread along an angular span of 11.4°.

  13. Gigabit Digital Filter Bank: Digital Backend Subsystem in the VERA Data-Acquisition System

    NASA Astrophysics Data System (ADS)

    Iguchi, Satoru; Kkurayama, Tomoharu; Kawaguchi, Noriyuki; Kawakami, Kazuyuki

    2005-02-01

    The VERA terminal is a new data-acquisition system developed for the VERA project, which is a project to construct a new Japanese VLBI array dedicated to make a 3-D map of our Milky Way Galaxy in terms of high-precision astrometry. New technology, a gigabit digital filter, was introduced in the development. The importance and advantages of a digital filter for radio astronomy have been studied as follows: (1) the digital filter can realize a variety of observation modes and maintain compatibility with different data-acquisition systems (Kiuchi et al. 1997 and Iguchi et al. 2000a), (2) the folding noise occurring in the sampling process can be reduced by combination with a higher-order sampling technique (Iguchi, Kawaguchi 2002), (3) and an ideal sharp cut-off bandedge and a flat amplitude/phase responses are approached by using a large number of taps available to use LSI of a large number of logic cells (Iguchi et al. 2000a). We developed the custom Finite Impulse Response filter chips and manufactured the Gigabit Digital Filter Banks (GDFBs) as a digital backend subsystem in the VERA terminal. In this paper, the design and development of the GDFB are presented in detail, and the performances and demonstrations of the developed GDFB are shown.

  14. Army AL&T, July-September 2008

    DTIC Science & Technology

    2008-09-01

    Technology , and Logistics (AT&L) Workforce and will summarize best practices , specific initiatives, and relevant accomplishments of DOD and the...PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Army Acquisition, Logistics & Technology (AT&L...logistics, and technology (AL&T) community. We have a vast number of programs that range from developing transformational technologies for our

  15. SU-E-I-09: The Impact of X-Ray Scattering On Image Noise for Dedicated Breast CT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, K; Gazi, P; Boone, J

    2015-06-15

    Purpose: To quantify the impact of detected x-ray scatter on image noise in flat panel based dedicated breast CT systems and to determine the optimal scanning geometry given practical trade-offs between radiation dose and scatter reduction. Methods: Four different uniform polyethylene cylinders (104, 131, 156, and 184 mm in diameter) were scanned as the phantoms on a dedicated breast CT scanner developed in our laboratory. Both stationary projection imaging and rotational cone-beam CT imaging was performed. For each acquisition type, three different x-ray beam collimations were used (12, 24, and 109 mm measured at isocenter). The aim was to quantifymore » image noise properties (pixel variance, SNR, and image NPS) under different levels of x-ray scatter, in order to optimize the scanning geometry. For both projection images and reconstructed CT images, individual pixel variance and NPS were determined and compared. Noise measurement from the CT images were also performed with different detector binning modes and reconstruction matrix sizes. Noise propagation was also tracked throughout the intermediate steps of cone-beam CT reconstruction, including the inverse-logarithmic process, Fourier-filtering before backprojection. Results: Image noise was lower in the presence of higher scatter levels. For the 184 mm polyethylene phantom, the image noise (measured in pixel variance) was ∼30% lower with full cone-beam acquisition compared to a narrow (12 mm) fan-beam acquisition. This trend is consistent across all phantom sizes and throughout all steps of CT image reconstruction. Conclusion: From purely a noise perspective, the cone-beam geometry (i.e. the full cone-angle acquisition) produces lower image noise compared to the lower-scatter fan-beam acquisition for breast CT. While these results are relevant in homogeneous phantoms, the full impact of scatter on noise in bCT should involve contrast-to-noise-ratio measurements in heterogeneous phantoms if the goal is to optimize the scanning geometry for dedicated breast CT. This work was supported by a grant from the National Institute for Biomedical Imaging and Bioengineering (R01 EB002138)« less

  16. X-ray satellite (ROSAT)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    With regards to technical performance, the project is running according to plan. An increase in total cost outlay was required. The new Dornier Systems schedule projects ROSAT launch readiness for April 27, 1988. However, as a result of the Challenger accident, no binding launch date has been received from NASA. The thirteenth status review was conducted at the prime contractor in March, 1986. Assembly of the FM mirror system has been interrupted due to irregularities in the gold damping; in addition, mission operation and simulator development are effected by understaffing. Postponements have been announced in the data transmission and components acquisition subsystems.

  17. First Experiments with the Tango Tablet for Indoor Scanning

    NASA Astrophysics Data System (ADS)

    Diakité, Abdoulaye A.; Zlatanova, Sisi

    2016-06-01

    During the last two decades, the third dimension took an important place in the heart of every multimedia. While the 3D technologies mainly used to be tools and subject for researchers, they are becoming commercially available to large public. To make it even more accessible, the Project Tango, leaded by Google, integrates in a simple Android tablet sensors that are able to perform acquisition of the 3D information of a real life scene. This makes it possible for a large number of applications to have access to it, ranging from gaming to indoor navigation, including virtual and augmented reality. In this paper we investigate the ability of the Tango tablet to perform the acquisition of indoor building environment to support application such as indoor navigation. We proceed to several scans in different buildings and we study the characteristics of the output models.

  18. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1990-01-01

    Archival reports on developments in programs managed by the JPL Office of Telecommunications and Data Acquisition (TDA) are provided. Topics covered include: DSN advanced systems (tracking and ground-based navigation; communications, spacecraft-ground; and station control and system technology) and DSN systems implementation (capabilities for existing projects; capabilities for new projects; TDA program management and analysis; and Goldstone solar system radar).

  19. 75 FR 19168 - Federal Acquisition Regulation; FAR Case 2009-005, Use of Project Labor Agreements for Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... located on Indian reservations. Response: GSA, DoD, and NASA have clarified in the final rule that project... Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Final rule. SUMMARY: GSA, DOD, and NASA are issuing a final rule amending the Federal Acquisition Regulation (FAR) to implement...

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saha, K; Barbarits, J; Humenik, R

    Purpose: Chang’s mathematical formulation is a common method of attenuation correction applied on reconstructed Jaszczak phantom images. Though Chang’s attenuation correction method has been used for 360° angle acquisition, its applicability for 180° angle acquisition remains a question with one vendor’s camera software producing artifacts. The objective of this work is to ensure that Chang’s attenuation correction technique can be applied for reconstructed Jaszczak phantom images acquired in both 360° and 180° mode. Methods: The Jaszczak phantom filled with 20 mCi of diluted Tc-99m was placed on the patient table of Siemens e.cam™ (n = 2) and Siemens Symbia™ (nmore » = 1) dual head gamma cameras centered both in lateral and axial directions. A total of 3 scans were done at 180° and 2 scans at 360° orbit acquisition modes. Thirty two million counts were acquired for both modes. Reconstruction of the projection data was performed using filtered back projection smoothed with pre reconstruction Butterworth filter (order: 6, cutoff: 0.55). Reconstructed transaxial slices were attenuation corrected by Chang’s attenuation correction technique as implemented in the camera software. Corrections were also done using a modified technique where photon path lengths for all possible attenuation paths through a pixel in the image space were added to estimate the corresponding attenuation factor. The inverse of the attenuation factor was utilized to correct the attenuated pixel counts. Results: Comparable uniformity and noise were observed for 360° acquired phantom images attenuation corrected by the vendor technique (28.3% and 7.9%) and the proposed technique (26.8% and 8.4%). The difference in uniformity for 180° acquisition between the proposed technique (22.6% and 6.8%) and the vendor technique (57.6% and 30.1%) was more substantial. Conclusion: Assessment of attenuation correction performance by phantom uniformity analysis illustrated improved uniformity with the proposed algorithm compared to the camera software.« less

  1. 44 CFR 80.17 - Project implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program PROPERTY ACQUISITION AND... encumbrances to the property must be extinguished before acquisition. (c) Purchase offer and supplemental... resulting in a National Flood Insurance Program (NFIP) claim of at least $5000. (2) For acquisition of...

  2. Thermal performance - Rangewood Villas. Field monitoring of various conservation construction techniques in the hot-humid area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-06-01

    This report, prepared by researchers at Florida Solar Energy Center, describes data acquired over a complete year of comprehensive thermal performance monitoring. The construction details of the house and instrumentation system are clearly documented. Rangewood Villas in Cocoa, Florida, is an innovative townhouse project that incorporates several energy efficient construction techniques developed at FSEC including vent skin roofs and walls utilizing radiant barriers to substantially lower heat gain through radiant transfer of solar energy. The computer simulation model selected as the basis for data acquisition parameters is the Thermal Analysis Research Program (TARP). The TARP model does not contain humiditymore » correlations which are very important in predicting thermal performance in the warm humid area. These correlations are developed for enhancement of the TARP model through extensive relative humidity measurements in various zones, and enthalpy measurements of the heat pump. The data acquisition system devised for this program provides a standard instrumentation system which can be adapted by others working in the hot humid area and intersted in developing comparative performance data.« less

  3. Advances in diffusion MRI acquisition and processing in the Human Connectome Project

    PubMed Central

    Sotiropoulos, Stamatios N; Jbabdi, Saad; Xu, Junqian; Andersson, Jesper L; Moeller, Steen; Auerbach, Edward J; Glasser, Matthew F; Hernandez, Moises; Sapiro, Guillermo; Jenkinson, Mark; Feinberg, David A; Yacoub, Essa; Lenglet, Christophe; Ven Essen, David C; Ugurbil, Kamil; Behrens, Timothy EJ

    2013-01-01

    The Human Connectome Project (HCP) is a collaborative 5-year effort to map human brain connections and their variability in healthy adults. A consortium of HCP investigators will study a population of 1200 healthy adults using multiple imaging modalities, along with extensive behavioral and genetic data. In this overview, we focus on diffusion MRI (dMRI) and the structural connectivity aspect of the project. We present recent advances in acquisition and processing that allow us to obtain very high-quality in-vivo MRI data, while enabling scanning of a very large number of subjects. These advances result from 2 years of intensive efforts in optimising many aspects of data acquisition and processing during the piloting phase of the project. The data quality and methods described here are representative of the datasets and processing pipelines that will be made freely available to the community at quarterly intervals, beginning in 2013. PMID:23702418

  4. Optimization of digital breast tomosynthesis (DBT) acquisition parameters for human observers: effect of reconstruction algorithms

    NASA Astrophysics Data System (ADS)

    Zeng, Rongping; Badano, Aldo; Myers, Kyle J.

    2017-04-01

    We showed in our earlier work that the choice of reconstruction methods does not affect the optimization of DBT acquisition parameters (angular span and number of views) using simulated breast phantom images in detecting lesions with a channelized Hotelling observer (CHO). In this work we investigate whether the model-observer based conclusion is valid when using humans to interpret images. We used previously generated DBT breast phantom images and recruited human readers to find the optimal geometry settings associated with two reconstruction algorithms, filtered back projection (FBP) and simultaneous algebraic reconstruction technique (SART). The human reader results show that image quality trends as a function of the acquisition parameters are consistent between FBP and SART reconstructions. The consistent trends confirm that the optimization of DBT system geometry is insensitive to the choice of reconstruction algorithm. The results also show that humans perform better in SART reconstructed images than in FBP reconstructed images. In addition, we applied CHOs with three commonly used channel models, Laguerre-Gauss (LG) channels, square (SQR) channels and sparse difference-of-Gaussian (sDOG) channels. We found that LG channels predict human performance trends better than SQR and sDOG channel models for the task of detecting lesions in tomosynthesis backgrounds. Overall, this work confirms that the choice of reconstruction algorithm is not critical for optimizing DBT system acquisition parameters.

  5. Hardware Implementation of Multiple Fan Beam Projection Technique in Optical Fibre Process Tomography

    PubMed Central

    Rahim, Ruzairi Abdul; Fazalul Rahiman, Mohd Hafiz; Leong, Lai Chen; Chan, Kok San; Pang, Jon Fea

    2008-01-01

    The main objective of this project is to implement the multiple fan beam projection technique using optical fibre sensors with the aim to achieve a high data acquisition rate. Multiple fan beam projection technique here is defined as allowing more than one emitter to transmit light at the same time using the switch-mode fan beam method. For the thirty-two pairs of sensors used, the 2-projection technique and 4-projection technique are being investigated. Sixteen sets of projections will complete one frame of light emission for the 2-projection technique while eight sets of projection will complete one frame of light emission for the 4-projection technique. In order to facilitate data acquisition process, PIC microcontroller and the sample and hold circuit are being used. This paper summarizes the hardware configuration and design for this project. PMID:27879885

  6. CALLISTO: scientific projects performed by high school students

    NASA Astrophysics Data System (ADS)

    Boer, Michel

    The Callisto project was initiated in 2002 by the "Lyće de l'Arc" (High School in Orange, e France) and the "Observatoire de Haute Provence". Its goal is to give the students motivation for scientific and technical studies: they have the possibility to perform scientific projects together with professional astronomers. The pupils work in groups of 3 to 4, each having a specific theme: geophysics, variable stars, small bodies of the solar system, mechanical and optical instrumentation. They follow a whole scientific approach, from the question to answer, the instrumental setup, acquisition, data reduction, and publication. During a week they are invited to observe using the OHP 1.20m and 0.80m, with the support of a professional astronomer. Some projects have been in fact derived from actual proposal accepted at OHP (e.g. rotation curves of binary asteroids). The best projects are considered for some competitions like ESO "catch a star", "Olympiade de Physique", etc. Since 2005 three high-schools participate to this project. The Callisto initiative has also produced the basis of a teacher training course. Callisto is an example of a succesful collaboration between an interdisciplinary team of teachers (physics, maths, philosophy, English...), a research institution (the OHP), and researchers.

  7. 23 CFR 710.309 - Acquisition.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Acquisition. 710.309 Section 710.309 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.309 Acquisition. The process of acquiring real property includes...

  8. 32 CFR 644.5 - Mineral acquisition practices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Mineral acquisition practices. 644.5 Section 644.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral acquisition practices. (a...

  9. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  10. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  11. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  12. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  13. Requirements management: keeping your technology acquisition project under control.

    PubMed

    Carr, J J

    2000-03-01

    Whether you are acquiring clinical or business information systems, patient monitoring systems, or therapeutic and diagnostic systems, the odds are good that the project will be delivered late, will cost far more than predicted, and will not provide all the features promised. The principal reason for project failure is improper management of the requirements of the system. Requirements engineering and management is a skill from the systems engineering profession that can be learned by nearly any professional who is managing a technology acquisition project. The author discusses what requirements engineering and management is and how it is done.

  14. Selective neural pathway targeting reveals key roles of thalamostriatal projection in the control of visual discrimination.

    PubMed

    Kato, Shigeki; Kuramochi, Masahito; Kobayashi, Kenta; Fukabori, Ryoji; Okada, Kana; Uchigashima, Motokazu; Watanabe, Masahiko; Tsutsui, Yuji; Kobayashi, Kazuto

    2011-11-23

    The dorsal striatum receives converging excitatory inputs from diverse brain regions, including the cerebral cortex and the intralaminar/midline thalamic nuclei, and mediates learning processes contributing to instrumental motor actions. However, the roles of each striatal input pathway in these learning processes remain uncertain. We developed a novel strategy to target specific neural pathways and applied this strategy for studying behavioral roles of the pathway originating from the parafascicular nucleus (PF) and projecting to the dorsolateral striatum. A highly efficient retrograde gene transfer vector encoding the recombinant immunotoxin (IT) receptor was injected into the dorsolateral striatum in mice to express the receptor in neurons innervating the striatum. IT treatment into the PF of the vector-injected animals caused a selective elimination of neurons of the PF-derived thalamostriatal pathway. The elimination of this pathway impaired the response selection accuracy and delayed the motor response in the acquisition of a visual cue-dependent discrimination task. When the pathway elimination was induced after learning acquisition, it disturbed the response accuracy in the task performance with no apparent change in the response time. The elimination did not influence spontaneous locomotion, methamphetamine-induced hyperactivity, and motor skill learning that demand the function of the dorsal striatum. These results demonstrate that thalamostriatal projection derived from the PF plays essential roles in the acquisition and execution of discrimination learning in response to sensory stimulus. The temporal difference in the pathway requirement for visual discrimination suggests a stage-specific role of thalamostriatal pathway in the modulation of response time of learned motor actions.

  15. A generic readout system for astrophysical detectors

    NASA Astrophysics Data System (ADS)

    Doumayrou, E.; Lortholary, M.

    2012-09-01

    We have developed a generic digital platform to fulfill the needs for the development of new detectors in astrophysics, which is used in lab, for ground-based telescopes instruments and also in prototype versions for space instruments development. This system is based on hardware FPGA electronic board (called MISE) together with software on a PC computer (called BEAR). The MISE board generates the fast clocking which reads the detectors thanks to a programmable digital sequencer and performs data acquisition, buffering of digitalized pixels outputs and interfaces with others boards. The data are then sent to the PC via a SpaceWire or Usb link. The BEAR software sets the MISE board up, makes data acquisition and enables the visualization, processing and the storage of data in line. These software tools are made of C++ and Labview (NI) on a Linux OS. MISE and BEAR make a generic acquisition architecture, on which dedicated analog boards are plugged, so that to accommodate with detectors specificity: number of pixels, the readout channels and frequency, analog bias and clock interfaces. We have used this concept to build a camera for the P-ARTEMIS project including a 256 pixels sub-millimeter bolometer detector at 10Kpixel/s (SPIE 7741-12 (2010)). For the EUCLID project, a lab camera is now working for the test of CCDs 4Mpixels at 4*200Kpixel/s. Another is working for the testing of new near infrared detectors (NIR LFSA for the ESA TRP program) 110Kpixels at 2*100Kpixels/s. Other projects are in progress for the space missions PLATO and SPICA.

  16. Contractor relationships and inter-organizational strategies in NASA's R and D acquisition process

    NASA Technical Reports Server (NTRS)

    Guiltinan, J.

    1976-01-01

    Interorganizational analysis of NASA's acquisition process for research and development systems is discussed. The importance of understanding the contractor environment, constraints, and motives in selecting an acquisition strategy is demonstrated. By articulating clear project goals, by utilizing information about the contractor and his needs at each stage in the acquisition process, and by thorough analysis of the inter-organizational relationship, improved selection of acquisition strategies and business practices is possible.

  17. The LUX experiment - trigger and data acquisition systems

    NASA Astrophysics Data System (ADS)

    Druszkiewicz, Eryk

    2013-04-01

    The Large Underground Xenon (LUX) detector is a two-phase xenon time projection chamber designed to detect interactions of dark matter particles with the xenon nuclei. Signals from the detector PMTs are processed by custom-built analog electronics which provide properly shaped signals for the trigger and data acquisition (DAQ) systems. During calibrations, both systems must be able to handle high rates and have large dynamic ranges; during dark matter searches, maximum sensitivity requires low thresholds. The trigger system uses eight-channel 64-MHz digitizers (DDC-8) connected to a Trigger Builder (TB). The FPGA cores on the digitizers perform real-time pulse identification (discriminating between S1 and S2-like signals) and event localization. The TB uses hit patterns, hit maps, and maximum response detection to make trigger decisions, which are reached within few microseconds after the occurrence of an event of interest. The DAQ system is comprised of commercial digitizers with customized firmware. Its real-time baseline suppression allows for a maximum event acquisition rate in excess of 1.5 kHz, which results in virtually no deadtime. The performance of the trigger and DAQ systems during the commissioning runs of LUX will be discussed.

  18. An Analysis of Current Operational Contract Support Planning Doctrine

    DTIC Science & Technology

    2015-09-01

    P). This project argues for the balanced development of OCS planning acquisition and non-acquisition focused resources to effectively integrate this...planning guidance developed is appropriate for initial entry operations applicable to various levels of theater maturity. 14. SUBJECT TERMS...balanced development of OCS planning acquisition and non- acquisition focused resources to effectively integrate this function across disciplines. The

  19. Clinical evaluation of reducing acquisition time on single-photon emission computed tomography image quality using proprietary resolution recovery software.

    PubMed

    Aldridge, Matthew D; Waddington, Wendy W; Dickson, John C; Prakash, Vineet; Ell, Peter J; Bomanji, Jamshed B

    2013-11-01

    A three-dimensional model-based resolution recovery (RR) reconstruction algorithm that compensates for collimator-detector response, resulting in an improvement in reconstructed spatial resolution and signal-to-noise ratio of single-photon emission computed tomography (SPECT) images, was tested. The software is said to retain image quality even with reduced acquisition time. Clinically, any improvement in patient throughput without loss of quality is to be welcomed. Furthermore, future restrictions in radiotracer supplies may add value to this type of data analysis. The aims of this study were to assess improvement in image quality using the software and to evaluate the potential of performing reduced time acquisitions for bone and parathyroid SPECT applications. Data acquisition was performed using the local standard SPECT/CT protocols for 99mTc-hydroxymethylene diphosphonate bone and 99mTc-methoxyisobutylisonitrile parathyroid SPECT imaging. The principal modification applied was the acquisition of an eight-frame gated data set acquired using an ECG simulator with a fixed signal as the trigger. This had the effect of partitioning the data such that the effect of reduced time acquisitions could be assessed without conferring additional scanning time on the patient. The set of summed data sets was then independently reconstructed using the RR software to permit a blinded assessment of the effect of acquired counts upon reconstructed image quality as adjudged by three experienced observers. Data sets reconstructed with the RR software were compared with the local standard processing protocols; filtered back-projection and ordered-subset expectation-maximization. Thirty SPECT studies were assessed (20 bone and 10 parathyroid). The images reconstructed with the RR algorithm showed improved image quality for both full-time and half-time acquisitions over local current processing protocols (P<0.05). The RR algorithm improved image quality compared with local processing protocols and has been introduced into routine clinical use. SPECT acquisitions are now acquired at half of the time previously required. The method of binning the data can be applied to any other camera system to evaluate the reduction in acquisition time for similar processes. The potential for dose reduction is also inherent with this approach.

  20. The new classic data acquisition system for NPOI

    NASA Astrophysics Data System (ADS)

    Sun, B.; Jorgensen, A. M.; Landavazo, M.; Hutter, D. J.; van Belle, G. T.; Mozurkewich, David; Armstrong, J. T.; Schmitt, H. R.; Baines, E. K.; Restaino, S. R.

    2014-07-01

    The New Classic data acquisition system is an important portion of a new project of stellar surface imaging with the NPOI, funded by the National Science Foundation, and enables the data acquisition necessary for the project. The NPOI can simultaneously deliver beams from 6 telescopes to the beam combining facility, and in the Classic beam combiner these are combined 4 at a time on 3 separate spectrographs with all 15 possible baselines observed. The Classic data acquisition system is limited to 16 of 32 wavelength channels on two spectrographs and limited to 30 s integrations followed by a pause to ush data. Classic also has some limitations in its fringe-tracking capability. These factors, and the fact that Classic incorporates 1990s technology which cannot be easily replaced are motivation for upgrading the data acquisition system. The New Classic data acquisition system is based around modern electronics, including a high-end Stratix FPGA, a 200 MB/s Direct Memory Access card, and a fast modern Linux computer. These allow for continuous recording of all 96 channels across three spectrographs, increasing the total amount of data recorded by a an estimated order of magnitude. The additional computing power on the data acquisition system also allows for the implementation of more sophisticated fringe-tracking algorithms which are needed for the Stellar Surface Imaging project. In this paper we describe the New Classic system design and implementation, describe the background and motivation for the system as well as show some initial results from using it.

  1. Quality Control Methodologies for Advanced EMI Sensor Data Acquisition and Anomaly Classification - Former Southwestern Proving Ground, Arkansas

    DTIC Science & Technology

    2015-07-01

    concentrations. A total of 11.23 acres of dynamic surveys were conducted using MetalMapper advanced electromagnetic induction (EMI) sensor. A total of...centimeter DGM digital geophysical mapping DSB Defense Science Board EE/CA Engineering Evaluation/Cost Analysis EMI electromagnetic induction...performed a live site demonstration project using the Geometrics MetalMapper advanced electromagnetic induction (EMI) sensor at the former

  2. Effects of Pharmacologic and Genetic Inhibition of Alk on Cognitive Impairments in NF1 Mutant Mice

    DTIC Science & Technology

    2016-08-01

    impairments. 15. SUBJECT TERMS cognitive performance, pharmacological inhibition, spatial memory , hippocampus 16. SECURITY CLASSIFICATION OF: 17...mouse model; hippocampus ; pharmacological inhibition; spatial memory 2 ACCOMPLISHMENTS: ▪ Major goals of the project Specific Aim (months 1-24...speeds seen in the water maze (Fig. 2). Contextual fear learning and memory Next the mice were tested for acquisition and extinction of hippocampus

  3. A Uniform Profit Policy for Government Acquisition

    DTIC Science & Technology

    1978-12-01

    primarily to evaluate managerial (not economic) performance. The second survey by Gitman and Forrester concentrated on determining the 3 capital...budgeting techniques used by major firms. A list of 268 companies 3 L. J. Gitman , and J. R. Forrester, Jr. , "A Survey of Capital Budgeting Techniques...Approximately 70 percent of the firms responding to the Gitman and Forrester survey required returns of at least 15 percent before considering a project

  4. A Model for Determining Optimal Governance Structure in DoD Acquisition Projects in a Performance-Based Environment

    DTIC Science & Technology

    2011-03-09

    task stability, technology application certainty, risk, and transaction-specific investments impact the selection of the optimal mode of governance...technology application certainty, risk, and transaction-specific investments impact the selection of the optimal mode of governance. Our model views...U.S. Defense Industry. The 1990s were a perfect storm of technological change, consolidation , budget downturns, environmental uncertainty, and the

  5. municipal recreation center is heated and cooled by solar energy

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Major fraction of energy requirements for community building is ksupplied by Sun. The 238 flat plate solar collectors are roof mounted on single story structure enclosing gymnasium, locker area, and health care clinic; heat exchanger transfers collected energy to 6,000 gallon storage tank. Final report chronicles project from inception to completion, documenting performance, costs, operating modes, and data acquisition system. Appendix contains manufacturers' product literature and engineering drawings.

  6. Pediatrics Residents' Confidence and Performance Following a Longitudinal Quality Improvement Curriculum.

    PubMed

    Courtlandt, Cheryl; Noonan, Laura; Koricke, Maureen Walsh; Zeskind, Philip Sanford; Mabus, Sarah; Feld, Leonard

    2016-02-01

    Quality improvement (QI) training is an integral part of residents' education. Understanding the educational value of a QI curriculum facilitates understanding of its impact. The purpose of this study was to evaluate the effects of a longitudinal QI curriculum on pediatrics residents' confidence and competence in the acquisition and application of QI knowledge and skills. Three successive cohorts of pediatrics residents (N = 36) participated in a longitudinal curriculum designed to increase resident confidence in QI knowledge and skills. Key components were a succession of progressive experiential projects, QI coaching, and resident team membership culminating in leadership of the project. Residents completed precurricular and postcurricular surveys and demonstrated QI competence by performance on the pediatric QI assessment scenario. Residents participating in the Center for Advancing Pediatric Excellence QI curriculum showed significant increases in pre-post measures of confidence in QI knowledge and skills. Coaching and team leadership were ranked by resident participants as having the most educational value among curriculum components. A pediatric QI assessment scenario, which correlated with resident-perceived confidence in acquisition of QI skills but not QI knowledge, is a tool available to test pediatrics residents' QI knowledge. A 3-year longitudinal, multimodal, experiential QI curriculum increased pediatrics residents' confidence in QI knowledge and skills, was feasible with faculty support, and was well-accepted by residents.

  7. VHDL implementation of feature-extraction algorithm for the PANDA electromagnetic calorimeter

    NASA Astrophysics Data System (ADS)

    Guliyev, E.; Kavatsyuk, M.; Lemmens, P. J. J.; Tambave, G.; Löhner, H.; Panda Collaboration

    2012-02-01

    A simple, efficient, and robust feature-extraction algorithm, developed for the digital front-end electronics of the electromagnetic calorimeter of the PANDA spectrometer at FAIR, Darmstadt, is implemented in VHDL for a commercial 16 bit 100 MHz sampling ADC. The source-code is available as an open-source project and is adaptable for other projects and sampling ADCs. Best performance with different types of signal sources can be achieved through flexible parameter selection. The on-line data-processing in FPGA enables to construct an almost dead-time free data acquisition system which is successfully evaluated as a first step towards building a complete trigger-less readout chain. Prototype setups are studied to determine the dead-time of the implemented algorithm, the rate of false triggering, timing performance, and event correlations.

  8. Automated ultrafast kilovoltage-megavoltage cone-beam CT for image guided radiotherapy of lung cancer: System description and real-time results.

    PubMed

    Blessing, Manuel; Arns, Anna; Wertz, Hansjoerg; Stsepankou, Dzmitry; Boda-Heggemann, Judit; Hesser, Juergen; Wenz, Frederik; Lohr, Frank

    2018-04-01

    To establish a fully automated kV-MV CBCT imaging method on a clinical linear accelerator that allows image acquisition of thoracic targets for patient positioning within one breath-hold (∼15s) under realistic clinical conditions. Our previously developed FPGA-based hardware unit which allows synchronized kV-MV CBCT projection acquisition is connected to a clinical linear accelerator system via a multi-pin switch; i.e. either kV-MV imaging or conventional clinical mode can be selected. An application program was developed to control the relevant linac parameters automatically and to manage the MV detector readout as well as the gantry angle capture for each MV projection. The kV projections are acquired with the conventional CBCT system. GPU-accelerated filtered backprojection is performed separately for both data sets. After appropriate grayscale normalization both modalities are combined and the final kV-MV volume is re-imported in the CBCT system to enable image matching. To demonstrate adequate geometrical accuracy of the novel imaging system the Penta-Guide phantom QA procedure is performed. Furthermore, a human plastinate and different tumor shapes in a thorax phantom are scanned. Diameters of the known tumor shapes are measured in the kV-MV reconstruction. An automated kV-MV CBCT workflow was successfully established in a clinical environment. The overall procedure, from starting the data acquisition until the reconstructed volume is available for registration, requires ∼90s including 17s acquisition time for 100° rotation. It is very simple and allows target positioning in the same way as for conventional CBCT. Registration accuracy of the QA phantom is within ±1mm. The average deviation from the known tumor dimensions measured in the thorax phantom was 0.7mm which corresponds to an improvement of 36% compared to our previous kV-MV imaging system. Due to automation the kV-MV CBCT workflow is speeded up by a factor of >10 compared to the manual approach. Thus, the system allows a simple, fast and reliable imaging procedure and fulfills all requirements to be successfully introduced into the clinical workflow now, enabling single-breath-hold volume imaging. Copyright © 2018. Published by Elsevier GmbH.

  9. Autonomously acquiring declarative and procedural knowledge for ICAT systems

    NASA Technical Reports Server (NTRS)

    Kovarik, Vincent J., Jr.

    1993-01-01

    The construction of Intelligent Computer Aided Training (ICAT) systems is critically dependent on the ability to define and encode knowledge. This knowledge engineering effort can be broadly divided into two categories: domain knowledge and expert or task knowledge. Domain knowledge refers to the physical environment or system with which the expert interacts. Expert knowledge consists of the set of procedures and heuristics employed by the expert in performing their task. Both these areas are a significant bottleneck in the acquisition of knowledge for ICAT systems. This paper presents a research project in the area of autonomous knowledge acquisition using a passive observation concept. The system observes an expert and then generalizes the observations into production rules representing the domain expert's knowledge.

  10. The Data Acquisition System of the Stockholm Educational Air Shower Array

    NASA Astrophysics Data System (ADS)

    Hofverberg, P.; Johansson, H.; Pearce, M.; Rydstrom, S.; Wikstrom, C.

    2005-12-01

    The Stockholm Educational Air Shower Array (SEASA) project is deploying an array of plastic scintillator detector stations on school roofs in the Stockholm area. Signals from GPS satellites are used to time synchronise signals from the widely separated detector stations, allowing cosmic ray air showers to be identified and studied. A low-cost and highly scalable data acquisition system has been produced using embedded Linux processors which communicate station data to a central server running a MySQL database. Air shower data can be visualised in real-time using a Java-applet client. It is also possible to query the database and manage detector stations from the client. In this paper, the design and performance of the system are described

  11. Per-Pixel, Dual-Counter Scheme for Optical Communications

    NASA Technical Reports Server (NTRS)

    Farr, William H.; Bimbaum, Kevin M.; Quirk, Kevin J.; Sburlan, Suzana; Sahasrabudhe, Adit

    2013-01-01

    Free space optical communications links from deep space are projected to fulfill future NASA communication requirements for 2020 and beyond. Accurate laser-beam pointing is required to achieve high data rates at low power levels.This innovation is a per-pixel processing scheme using a pair of three-state digital counters to implement acquisition and tracking of a dim laser beacon transmitted from Earth for pointing control of an interplanetary optical communications system using a focal plane array of single sensitive detectors. It shows how to implement dim beacon acquisition and tracking for an interplanetary optical transceiver with a method that is suitable for both achieving theoretical performance, as well as supporting additional functions of high data rate forward links and precision spacecraft ranging.

  12. Removing ring artefacts from synchrotron radiation-based hard x-ray tomography data

    NASA Astrophysics Data System (ADS)

    Thalmann, Peter; Bikis, Christos; Schulz, Georg; Paleo, Pierre; Mirone, Alessandro; Rack, Alexander; Siegrist, Stefan; Cörek, Emre; Huwyler, Jörg; Müller, Bert

    2017-09-01

    In hard X-ray microtomography, ring artefacts regularly originate from incorrectly functioning pixel elements on the detector or from particles and scratches on the scintillator. We show that due to the high sensitivity of contemporary beamline setups further causes inducing inhomogeneities in the impinging wavefronts have to be considered. We propose in this study a method to correct the thereby induced failure of simple flatfield approaches. The main steps of the pipeline are (i) registration of the reference images with the radiographs (projections), (ii) integration of the flat-field corrected projection over the acquisition angle, (iii) high-pass filtering of the integrated projection, (iv) subtraction of filtered data from the flat-field corrected projections. The performance of the protocol is tested on data sets acquired at the beamline ID19 at ESRF using single distance phase tomography.

  13. Ultra-low dose quantitative CT myocardial perfusion imaging with sparse-view dynamic acquisition and image reconstruction: A feasibility study.

    PubMed

    Enjilela, Esmaeil; Lee, Ting-Yim; Hsieh, Jiang; Wisenberg, Gerald; Teefy, Patrick; Yadegari, Andrew; Bagur, Rodrigo; Islam, Ali; Branch, Kelley; So, Aaron

    2018-03-01

    We implemented and validated a compressed sensing (CS) based algorithm for reconstructing dynamic contrast-enhanced (DCE) CT images of the heart from sparsely sampled X-ray projections. DCE CT imaging of the heart was performed on five normal and ischemic pigs after contrast injection. DCE images were reconstructed with filtered backprojection (FBP) and CS from all projections (984-view) and 1/3 of all projections (328-view), and with CS from 1/4 of all projections (246-view). Myocardial perfusion (MP) measurements with each protocol were compared to those with the reference 984-view FBP protocol. Both the 984-view CS and 328-view CS protocols were in good agreements with the reference protocol. The Pearson correlation coefficients of 984-view CS and 328-view CS determined from linear regression analyses were 0.98 and 0.99 respectively. The corresponding mean biases of MP measurement determined from Bland-Altman analyses were 2.7 and 1.2ml/min/100g. When only 328 projections were used for image reconstruction, CS was more accurate than FBP for MP measurement with respect to 984-view FBP. However, CS failed to generate MP maps comparable to those with 984-view FBP when only 246 projections were used for image reconstruction. DCE heart images reconstructed from one-third of a full projection set with CS were minimally affected by aliasing artifacts, leading to accurate MP measurements with the effective dose reduced to just 33% of conventional full-view FBP method. The proposed CS sparse-view image reconstruction method could facilitate the implementation of sparse-view dynamic acquisition for ultra-low dose CT MP imaging. Copyright © 2017 Elsevier B.V. All rights reserved.

  14. Development of a Naval Supply Systems Command Acquisition Supplement - A Business Practice Improvement

    DTIC Science & Technology

    2015-09-01

    The information reviewed for this project will help the reader understand how acquisition rules and regulations flow down to the acquisition...ACQUISITIONS IN SUPPORT OF OPERATIONS IN AFGHANISTAN Aug-09 N Obsolete 09-26 PASSIVE RADIO FREQUENCY IDENTIFICATION ( RFID ) DFARS COMPLIANCE REPORTING...been made. Many of the instructions and publications refer readers to additional instructions and publications, and often reference specific policy

  15. Coast Guard: Opportunities Exist to Further Improve Acquisition Management Capabilities

    DTIC Science & Technology

    2011-04-01

    Coast Guard’s significant acquisition challenges, including project challenges in its Deepwater program. GAO’s prior work on the Coast Guard...to defense readiness. We have reported extensively on the Coast Guard’s significant acquisition challenges, including its Deepwater program, which...prior work on the Deepwater acquisition program identified problems in costs, management, and oversight that have led to delivery delays and other

  16. TELECOMMUNICATIONS. GSA Action Needed to Realize Benefits of Metropolitan Area Acquisition Program

    DTIC Science & Technology

    2002-04-01

    Reform, House of RepresentativesApril 2002 TELECOMMUNICATIONS GSA Action Needed to Realize Benefits of Metropolitan Area Acquisition Programa GAO-02...Needed to Realize Benefits of Metropolitan Area Acquisition Program Contract Number Grant Number Program Element Number Author(s) Project Number...TELECOMMUNICATIONS GSA Action Needed to Realize Benefits of Metropolitan Area Acquisition Program This is a test for developing highlights for a GAO report

  17. 23 CFR 710.203 - Funding and reimbursement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... property except as provided in § 710.501 for early acquisition: (1) The project for which the real property... and hardship acquisition; and in 23 CFR 710.501, early acquisition. Appraisal completion may be...) Costs have been incurred in conformance with State and Federal law requirements. (b) Direct eligible...

  18. Reengineering the Acquisition/Procurement Process: A Methodology for Requirements Collection

    NASA Technical Reports Server (NTRS)

    Taylor, Randall; Vanek, Thomas

    2011-01-01

    This paper captures the systematic approach taken by JPL's Acquisition Reengineering Project team, the methodology used, challenges faced, and lessons learned. It provides pragmatic "how-to" techniques and tools for collecting requirements and for identifying areas of improvement in an acquisition/procurement process or other core process of interest.

  19. Evaluation of areas prepared for planting using LANDSAT data. M.S. Thesis; [Ribeirao Preto, Brazil

    NASA Technical Reports Server (NTRS)

    Parada, N. D. J. (Principal Investigator); Deassuncao, G. V.; Duarte, V.

    1983-01-01

    Three different algorithms (SINGLE-CELL, MAXVER and MEDIA K) were used to automatically interpret data from LANDSAT observations of an area of Ribeirao Preto, Brazil. Photographic transparencies were obtained, projected and visually interpreted. The results show that: (1) the MAXVER algorithm presented a better classification performance; (2) verification of the changes in cultivated areas using data from the three different acquisition dates was possible; (3) the water bodies, degraded lands, urban areas, and fallow fields were frequently mistaken by cultivated soils; and (4) the use of projected photographic transparencies furnished satisfactory results, besides reducing the time spent on the image-100 system.

  20. Software Acquisition Process (SWAP) Model FY81

    DTIC Science & Technology

    1982-12-01

    experience. In addition, the manpower accounting techniques and the effects of resource limitation are described below. a. Contractor Personnel. Five job...developed are each oriented to a specific type of developmental activity. Between them, they account for all types of activities in the acquisition...manning levels and duration; Decision Box probability; and project staffing levels. They take into account the overall size of the project and the

  1. Defense Acquisition Research Journal (ARJ). Volume 22, Number 3, Issue 74, July 2015

    DTIC Science & Technology

    2016-04-05

    DoD acquisition system and is not limited to government or contractor personnel. • Employees of the federal government (including military personnel...Incentives • Agile Program Management • Incorporating Foreign Military Sales and Direct Contractor Sales Strategies into Programs • Controlling...projected final cost overruns estimated by contractor and government personnel. The comparison shows that the overruns projected by the contractor and

  2. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scheib, J.; Pless, S.; Torcellini, P.

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy usemore » requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.« less

  3. 32 CFR 644.1 - Preface.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... scheduling for the acquisition of lands in connection with Military and Civil Works projects. It is not... and potential problems are fully considered in planning for the acquisition of additional lands...

  4. A four-lens based plenoptic camera for depth measurements

    NASA Astrophysics Data System (ADS)

    Riou, Cécile; Deng, Zhiyuan; Colicchio, Bruno; Lauffenburger, Jean-Philippe; Kohler, Sophie; Haeberlé, Olivier; Cudel, Christophe

    2015-04-01

    In previous works, we have extended the principles of "variable homography", defined by Zhang and Greenspan, for measuring height of emergent fibers on glass and non-woven fabrics. This method has been defined for working with fabric samples progressing on a conveyor belt. Triggered acquisition of two successive images was needed to perform the 3D measurement. In this work, we have retained advantages of homography variable for measurements along Z axis, but we have reduced acquisitions number to a single one, by developing an acquisition device characterized by 4 lenses placed in front of a single image sensor. The idea is then to obtain four projected sub-images on a single CCD sensor. The device becomes a plenoptic or light field camera, capturing multiple views on the same image sensor. We have adapted the variable homography formulation for this device and we propose a new formulation to calculate a depth with plenoptic cameras. With these results, we have transformed our plenoptic camera in a depth camera and first results given are very promising.

  5. Particulate and Gaseous Emissions Measurement System (PAGEMS) Project

    NASA Technical Reports Server (NTRS)

    Kostic, Milivoje

    2003-01-01

    Professor Kostic will work on the current UEET program of the Aerosol and Particulate task. This task will focus on: how to acquire experimental data through Labview software how to make the data acquisition system more efficient trouble existing problem of the labview software recommend a better system improve existing system with better data and usually friendly.Three different assignments in this project included:Particle-Size Distribution Data Presentation;Error or Uncertainty Analysis of Measurement Results; and Enhancement of LabVlRN Data Acquisition Program for GRC PAGEMS Project.

  6. Gruppeorganiseret og selvstyret fremmedsprogstilegnelse. Et undervisningseksperiment pa RUC [and] Skolesprogene. Om fremmedsprogenes status og funktion i gymnasiet. ROLIG Papir 22 (Group Organized and Self Managed Foreign Language Acquisition. A Research Project at RUC [and] School Languages. On the Status and Function of Foreign Languages in Secondary Schools. ROLIG Paper 22).

    ERIC Educational Resources Information Center

    Jakobsen, Karen Sonne

    Two articles highlight different issues on foreign language learning and instruction in Denmark. The first article describes a research project at Roskilde University Center that focuses on group organized and self managed foreign language acquisition. The idea for the project came about as a result of concern over problems related to foreign…

  7. Project Copernicus: An Earth observing system

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Hunsaker Aerospace Corporation is presenting this proposal for Project Copernicus to fulfill the need for space-based remote sensing of Earth. Concentration is on data acquisition. Copernicus is designed to be a flexible system of spacecraft in a low near-polar orbit. The goal is to acquire data so that the scientists may begin to understand many Earth processes and interactions. The mission objective of Copernicus is to provide a space-based, remote-sensing measurement data acquisition and transfer system for 15 years. A description of the design project is presented.

  8. Long-term personality data collection in support of spaceflight and analogue research.

    PubMed

    Musson, David M; Helmreich, Robert L

    2005-06-01

    This is a review of past and present research into personality and performance at the University of Texas (UT) Human Factors Research Project. Specifically, personality trait data collected from astronauts, pilots, Antarctic personnel, and other groups over a 15-yr period is discussed with particular emphasis on research in space and space analogue environments. The UT Human Factors Research Project conducts studies in personality and group dynamics in aviation, space, and medicine. Current studies include personality determinants of professional cultures, team effectiveness in both medicine and aviation, and personality predictors of long-term astronaut performance. The Project also studies the design and effectiveness of behavioral strategies used to minimize error and maximize team performance in safety-critical work settings. A multi-year personality and performance dataset presents many opportunities for research, including long-term and follow-up studies of human performance, analyses of trends in recruiting and attrition, and the ability to adapt research design to operational changes and methodological advances. Special problems posed by such long-duration projects include issues of confidentiality and security, as well as practical limitations imposed by current peer-review and short-term funding practices. Practical considerations for ongoing dataset management include consistency of assessment instruments over time, variations in data acquisition from one year to the next, and dealing with changes in theory and practice that occur over the life of the project. A fundamental change in how research into human performance is funded would be required to ensure the ongoing development of such long-duration research databases.

  9. 24 CFR 241.1000 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Insurance for Equity Loans and Acquisition Loans... the owner of an eligible multifamily project to capture a portion of the project's equity, in...

  10. A Model for Determining Optimal Governance Structure in DoD Acquisition Projects in a Performance-Based Environment

    DTIC Science & Technology

    2010-04-30

    combating market dynamism (Aldrich, 1979; Child, 1972), which is a result of evolving technology, shifting prices, or variance in product availability... principles : (1) human beings are bounded rationally, and (2), as a result of being rationally bound, will always choose to further their own self... principles to govern the relationship among the buyers and suppliers. Our conceptual model aligns the alternative governance structures derived

  11. 25 CFR 700.3 - Assurances with respect to acquisition and displacement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Assurances with respect to acquisition and displacement... displacement. The Commission will not approve any programs or projects which may result in the acquisition of habitations and/or improvements, or in the displacement of any person, until such time as written assurances...

  12. 25 CFR 700.3 - Assurances with respect to acquisition and displacement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false Assurances with respect to acquisition and displacement... displacement. The Commission will not approve any programs or projects which may result in the acquisition of habitations and/or improvements, or in the displacement of any person, until such time as written assurances...

  13. 25 CFR 700.3 - Assurances with respect to acquisition and displacement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false Assurances with respect to acquisition and displacement... displacement. The Commission will not approve any programs or projects which may result in the acquisition of habitations and/or improvements, or in the displacement of any person, until such time as written assurances...

  14. 25 CFR 700.3 - Assurances with respect to acquisition and displacement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 2 2014-04-01 2014-04-01 false Assurances with respect to acquisition and displacement... displacement. The Commission will not approve any programs or projects which may result in the acquisition of habitations and/or improvements, or in the displacement of any person, until such time as written assurances...

  15. 25 CFR 700.3 - Assurances with respect to acquisition and displacement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Assurances with respect to acquisition and displacement... displacement. The Commission will not approve any programs or projects which may result in the acquisition of habitations and/or improvements, or in the displacement of any person, until such time as written assurances...

  16. New low noise CCD cameras for Pi-of-the-Sky project

    NASA Astrophysics Data System (ADS)

    Kasprowicz, G.; Czyrkowski, H.; Dabrowski, R.; Dominik, W.; Mankiewicz, L.; Pozniak, K.; Romaniuk, R.; Sitek, P.; Sokolowski, M.; Sulej, R.; Uzycki, J.; Wrochna, G.

    2006-10-01

    Modern research trends require observation of fainter and fainter astronomical objects on large areas of the sky. This implies usage of systems with high temporal and optical resolution with computer based data acquisition and processing. Therefore Charge Coupled Devices (CCD) became so popular. They offer quick picture conversion with much better quality than film based technologies. This work is theoretical and practical study of the CCD based picture acquisition system. The system was optimized for "Pi of The Sky" project. But it can be adapted to another professional astronomical researches. The work includes issue of picture conversion, signal acquisition, data transfer and mechanical construction of the device.

  17. Max CAPR: high-resolution 3D contrast-enhanced MR angiography with acquisition times under 5 seconds.

    PubMed

    Haider, Clifton R; Borisch, Eric A; Glockner, James F; Mostardi, Petrice M; Rossman, Phillip J; Young, Phillip M; Riederer, Stephen J

    2010-10-01

    High temporal and spatial resolution is desired in imaging of vascular abnormalities having short arterial-to-venous transit times. Methods that exploit temporal correlation to reduce the observed frame time demonstrate temporal blurring, obfuscating bolus dynamics. Previously, a Cartesian acquisition with projection reconstruction-like (CAPR) sampling method has been demonstrated for three-dimensional contrast-enhanced angiographic imaging of the lower legs using two-dimensional sensitivity-encoding acceleration and partial Fourier acceleration, providing 1mm isotropic resolution of the calves, with 4.9-sec frame time and 17.6-sec temporal footprint. In this work, the CAPR acquisition is further undersampled to provide a net acceleration approaching 40 by eliminating all view sharing. The tradeoff of frame time and temporal footprint in view sharing is presented and characterized in phantom experiments. It is shown that the resultant 4.9-sec acquisition time, three-dimensional images sets have sufficient spatial and temporal resolution to clearly portray arterial and venous phases of contrast passage. It is further hypothesized that these short temporal footprint sequences provide diagnostic quality images. This is tested and shown in a series of nine contrast-enhanced MR angiography patient studies performed with the new method.

  18. "Click Here to Order This Book": A Case Study of Print and Electronic Patron-Driven Acquisition in University College Dublin

    ERIC Educational Resources Information Center

    Tynan, Mark; McCarney, Eoin

    2014-01-01

    University College Dublin became the first library in the Republic of Ireland to trial patron-driven acquisition (PDA) as a collection development tool in 2013. A total of 42% of UCD Library's book budget was allocated to the project, which included both electronic and print books. This article describes the twelve month project from the tender…

  19. Reference-free ground truth metric for metal artifact evaluation in CT images.

    PubMed

    Kratz, Bärbel; Ens, Svitlana; Müller, Jan; Buzug, Thorsten M

    2011-07-01

    In computed tomography (CT), metal objects in the region of interest introduce data inconsistencies during acquisition. Reconstructing these data results in an image with star shaped artifacts induced by the metal inconsistencies. To enhance image quality, the influence of the metal objects can be reduced by different metal artifact reduction (MAR) strategies. For an adequate evaluation of new MAR approaches a ground truth reference data set is needed. In technical evaluations, where phantoms can be measured with and without metal inserts, ground truth data can easily be obtained by a second reference data acquisition. Obviously, this is not possible for clinical data. Here, an alternative evaluation method is presented without the need of an additionally acquired reference data set. The proposed metric is based on an inherent ground truth for metal artifacts as well as MAR methods comparison, where no reference information in terms of a second acquisition is needed. The method is based on the forward projection of a reconstructed image, which is compared to the actually measured projection data. The new evaluation technique is performed on phantom and on clinical CT data with and without MAR. The metric results are then compared with methods using a reference data set as well as an expert-based classification. It is shown that the new approach is an adequate quantification technique for artifact strength in reconstructed metal or MAR CT images. The presented method works solely on the original projection data itself, which yields some advantages compared to distance measures in image domain using two data sets. Beside this, no parameters have to be manually chosen. The new metric is a useful evaluation alternative when no reference data are available.

  20. Simultaneous 99mtc/111in spect reconstruction using accelerated convolution-based forced detection monte carlo

    NASA Astrophysics Data System (ADS)

    Karamat, Muhammad I.; Farncombe, Troy H.

    2015-10-01

    Simultaneous multi-isotope Single Photon Emission Computed Tomography (SPECT) imaging has a number of applications in cardiac, brain, and cancer imaging. The major concern however, is the significant crosstalk contamination due to photon scatter between the different isotopes. The current study focuses on a method of crosstalk compensation between two isotopes in simultaneous dual isotope SPECT acquisition applied to cancer imaging using 99mTc and 111In. We have developed an iterative image reconstruction technique that simulates the photon down-scatter from one isotope into the acquisition window of a second isotope. Our approach uses an accelerated Monte Carlo (MC) technique for the forward projection step in an iterative reconstruction algorithm. The MC estimated scatter contamination of a radionuclide contained in a given projection view is then used to compensate for the photon contamination in the acquisition window of other nuclide. We use a modified ordered subset-expectation maximization (OS-EM) algorithm named simultaneous ordered subset-expectation maximization (Sim-OSEM), to perform this step. We have undertaken a number of simulation tests and phantom studies to verify this approach. The proposed reconstruction technique was also evaluated by reconstruction of experimentally acquired phantom data. Reconstruction using Sim-OSEM showed very promising results in terms of contrast recovery and uniformity of object background compared to alternative reconstruction methods implementing alternative scatter correction schemes (i.e., triple energy window or separately acquired projection data). In this study the evaluation is based on the quality of reconstructed images and activity estimated using Sim-OSEM. In order to quantitate the possible improvement in spatial resolution and signal to noise ratio (SNR) observed in this study, further simulation and experimental studies are required.

  1. 48 CFR 1301.671 - Assignment of program and project managers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... project managers. 1301.671 Section 1301.671 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE..., and Responsibilities 1301.671 Assignment of program and project managers. The Department's Program and Project Manager certification program for the assignment and certification of Program and Project Managers...

  2. Early Warning Look Ahead Metrics: The Percent Milestone Backlog Metric

    NASA Technical Reports Server (NTRS)

    Shinn, Stephen A.; Anderson, Timothy P.

    2017-01-01

    All complex development projects experience delays and corresponding backlogs of their project control milestones during their acquisition lifecycles. NASA Goddard Space Flight Center (GSFC) Flight Projects Directorate (FPD) teamed with The Aerospace Corporation (Aerospace) to develop a collection of Early Warning Look Ahead metrics that would provide GSFC leadership with some independent indication of the programmatic health of GSFC flight projects. As part of the collection of Early Warning Look Ahead metrics, the Percent Milestone Backlog metric is particularly revealing, and has utility as a stand-alone execution performance monitoring tool. This paper describes the purpose, development methodology, and utility of the Percent Milestone Backlog metric. The other four Early Warning Look Ahead metrics are also briefly discussed. Finally, an example of the use of the Percent Milestone Backlog metric in providing actionable insight is described, along with examples of its potential use in other commodities.

  3. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  4. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  5. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  6. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  7. Applications of nonlocal means algorithm in low-dose X-ray CT image processing and reconstruction: a review

    PubMed Central

    Zhang, Hao; Zeng, Dong; Zhang, Hua; Wang, Jing; Liang, Zhengrong

    2017-01-01

    Low-dose X-ray computed tomography (LDCT) imaging is highly recommended for use in the clinic because of growing concerns over excessive radiation exposure. However, the CT images reconstructed by the conventional filtered back-projection (FBP) method from low-dose acquisitions may be severely degraded with noise and streak artifacts due to excessive X-ray quantum noise, or with view-aliasing artifacts due to insufficient angular sampling. In 2005, the nonlocal means (NLM) algorithm was introduced as a non-iterative edge-preserving filter to denoise natural images corrupted by additive Gaussian noise, and showed superior performance. It has since been adapted and applied to many other image types and various inverse problems. This paper specifically reviews the applications of the NLM algorithm in LDCT image processing and reconstruction, and explicitly demonstrates its improving effects on the reconstructed CT image quality from low-dose acquisitions. The effectiveness of these applications on LDCT and their relative performance are described in detail. PMID:28303644

  8. Acquisition system for the "EMSO Generic Instrument Module" (EGIM) and analysis of the data obtained during its first deployment at OBSEA site (Spain)

    NASA Astrophysics Data System (ADS)

    Garcia, Oscar; Mihai Toma, Daniel; Dañobeitia, Juanjo; del Rio, Joaquin; Bartolome, Rafael; Martínez, Enoc; Nogueras, Marc; Bghiel, Ikram; Lanteri, Nadine; Rolin, Jean Francois; Beranzoli, Laura; Favali, Paolo

    2017-04-01

    The EMSODEV project (EMSO implementation and operation: DEVelopment of instrument module) is an Horizon-2020 UE project whose overall objective is the operation of eleven seafloor observatories and four test sites. These infrastructures are distributed throughout European seas, from the Arctic across the Atlantic and the Mediterranean to the Black Sea, and are managed by the European consortium EMSO-ERIC (European Research Infrastructure Consortium) with the participation of 8 European countries and other associated partners. Recently, we have implemented a Generic Sensor Module (EGIM) within the EMSO-ERIC distributed marine research infrastructure. EGIM is able to operate on any EMSO observatory node, mooring line, seabed station, cabled or non-cabled and surface buoy. The main role of EGIM is to measure homogeneously a set of core variables using the same hardware, sensor references, qualification methods, calibration methods, data format and access, maintenance procedures in several European ocean locations. The EGIM module acquires a wide range of ocean parameters in a long-term consistent, accurate and comparable manner from disciplines such as biology, geology, chemistry, physics, engineering, and computer science, from polar to subtropical environments, through the water column down to the deep sea. Our work includes developing standard-compliant generic software for Sensor Web Enablement (SWE) on EGIM and to perform the first onshore and offshore test bench, to support the sensors data acquisition on a new interoperable EGIM system. EGIM in its turn is linked to an acquisition drives processes, a centralized Sensor Observation Service (SOS) server and a laboratory monitor system (LabMonitor) that records events and alarms during acquisition. The measurements recorded along EMSO NODES are essential to accurately respond to the social and scientific challenges such as climate change, changes in marine ecosystems, and marine hazards. This presentation shows the first EGIM deployment and the SWE infrastructure, developed to manage the data acquisition from the underwater sensors and their insertion to the SOS interface.

  9. 77 FR 44045 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-60; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... the United States Defense Advanced Research Projects Agency (DARPA) to the list of agencies that have... taxation of Government cost-reimbursement contracts when contractors and their subcontractors purchase...

  10. The ATLAS project: The effects of a constructionist digital laboratory project on undergraduate laboratory performance.

    PubMed

    Shoepe, Todd C; Cavedon, Dana K; Derian, Joseph M; Levy, Celine S; Morales, Amy

    2015-01-01

    Anatomical education is a dynamic field where developments in the implementation of constructive, situated-learning show promise in improving student achievement. The purpose of this study was to examine the effectiveness of an individualized, technology heavy project in promoting student performance in a combined anatomy and physiology laboratory course. Mixed-methods research was used to compare two cohorts of anatomy laboratories separated by the adoption of a new laboratory atlas project, which were defined as preceding (PRE) and following the adoption of the Anatomical Teaching and Learning Assessment Study (ATLAS; POST). The ATLAS project required the creation of a student-generated, photographic atlas via acquisition of specimen images taken with tablet technology and digital microscope cameras throughout the semester. Images were transferred to laptops, digitally labeled and photo edited weekly, and compiled into a digital book using Internet publishing freeware for final project submission. An analysis of covariance confirmed that student final examination scores were improved (P < 0.05) following the implementation of the laboratory atlas project (PRE, n = 75; POST, n = 90; means ± SE; 74.9 ± 0.9 versus 78.1 ± 0.8, respectively) after controlling for cumulative student grade point average. Analysis of questionnaires collected (n = 68) from the post group suggested students identified with atlas objectives, appreciated the comprehensive value in final examination preparation, and the constructionism involved, but recommended alterations in assignment logistics and the format of the final version. Constructionist, comprehensive term-projects utilizing student-preferred technologies could be used to improve performance toward student learning outcomes. © 2014 American Association of Anatomists.

  11. Innovative methods of popularizing technical education

    NASA Astrophysics Data System (ADS)

    Shkitsa, L. Y.; Panchuk, V. G.; Kornuta, V. A.

    2017-05-01

    There have been analyzed reasons of the loss of technical education’s popularity. Also, the analysis of known educational and production methods, oriented at the innovative model of development of society, was performed. It is stated that the acquisition of 21st century’s skills as a result of competition of technical education are natural for the DIY ideology, which was realized in the institutions like Fab Lab. The new educational strategy, based on project-based learning, is proposed to be implemented as a special laboratory with equipment, which would be a center of innovative development for students at the Technical University. Moreover, the list of projects planned for implementation, that includes not only projects, specific to a particular university, but also projects, demanded by society as a whole, is specified. It is worth to implement trendy projects in the laboratory, such as toy-like, ecological projects; projects of the energy dependence decrease or the energy efficiency increase, modern digital or innovative projects etc. The student should gain knowledge, skills and, possibly, equipment that are available for immediate usage on the labor market or for the realization of his own projects or the community’s projects in everyday life after the realization of the particular project at the laboratory

  12. An image‐based method to synchronize cone‐beam CT and optical surface tracking

    PubMed Central

    Schaerer, Joël; Riboldi, Marco; Sarrut, David; Baroni, Guido

    2015-01-01

    The integration of in‐room X‐ray imaging and optical surface tracking has gained increasing importance in the field of image guided radiotherapy (IGRT). An essential step for this integration consists of temporally synchronizing the acquisition of X‐ray projections and surface data. We present an image‐based method for the synchronization of cone‐beam computed tomography (CBCT) and optical surface systems, which does not require the use of additional hardware. The method is based on optically tracking the motion of a component of the CBCT/gantry unit, which rotates during the acquisition of the CBCT scan. A calibration procedure was implemented to relate the position of the rotating component identified by the optical system with the time elapsed since the beginning of the CBCT scan, thus obtaining the temporal correspondence between the acquisition of X‐ray projections and surface data. The accuracy of the proposed synchronization method was evaluated on a motorized moving phantom, performing eight simultaneous acquisitions with an Elekta Synergy CBCT machine and the AlignRT optical device. The median time difference between the sinusoidal peaks of phantom motion signals extracted from the synchronized CBCT and AlignRT systems ranged between ‐3.1 and 12.9 msec, with a maximum interquartile range of 14.4 msec. The method was also applied to clinical data acquired from seven lung cancer patients, demonstrating the potential of the proposed approach in estimating the individual and daily variations in respiratory parameters and motion correlation of internal and external structures. The presented synchronization method can be particularly useful for tumor tracking applications in extracranial radiation treatments, especially in the field of patient‐specific breathing models, based on the correlation between internal tumor motion and external surface surrogates. PACS number: 87

  13. Microhole Coiled Tubing Bottom Hole Assemblies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Don Macune

    2008-06-30

    The original objective of the project, to deliver an integrated 3 1/8-inch diameter Measurement While Drilling (MWD) and Logging While Drilling (LWD) system for drilling small boreholes using coiled tubing drilling, has been achieved. Two prototype systems have been assembled and tested in the lab. One of the systems has been successfully tested downhole in a conventional rotary drilling environment. Development of the 3 1/8-inch system has also lead to development and commercialization of a slightly larger 3.5-inch diameter system. We are presently filling customer orders for the 3.5-inch system while continuing with commercialization of the 3 1/8-inch system. Themore » equipment developed by this project will be offered for sale to multiple service providers around the world, enabling the more rapid expansion of both coiled tubing drilling and conventional small diameter drilling. The project was based on the reuse of existing technology whenever possible in order to minimize development costs, time, and risks. The project was begun initially by Ultima Labs, at the time a small company ({approx}12 employees) which had successfully developed a number of products for larger oil well service companies. In September, 2006, approximately 20 months after inception of the project, Ultima Labs was acquired by Sondex plc, a worldwide manufacturer of downhole instrumentation for cased hole and drilling applications. The acquisition provided access to proven technology for mud pulse telemetry, downhole directional and natural gamma ray measurements, and surface data acquisition and processing, as well as a global sales and support network. The acquisition accelerated commercialization through existing Sondex customers. Customer demand resulted in changes to the product specification to support hotter (150 C) and deeper drilling (20,000 psi pressure) than originally proposed. The Sondex acquisition resulted in some project delays as the resistivity collar was interfaced to a different MWD system and also as the mechanical design was revised for the new pressure requirements. However, the Sondex acquisition has resulted in a more robust system, secure funding for completion of the project, and more rapid commercialization.« less

  14. Energy Keepers Incorporated, U.S. Department of Energy Tribal Energy Program Award #DE-EE0005040 Final Report December 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gillin, Charmel; Lipscomb, Brian

    This project aimed at supporting one key component of a major multi-step undertaking on the part of the CSKT: the acquisition of the Kerr Hydroelectric project and its subsequent operation as a wholesale power generation facility. This project provided support to kick-start the development of the organizational structure to acquire and operate the facility by acquiring critical expertise necessary for the acquisition by funding in part two key personnel for the first two years of the four-year organizational development process. These individuals provided the Tribes with expert knowledge in the highly specialized areas of resource balancing, power marketing, and hydro-engineering;more » essential prerequisites to the Tribes' ability to build an organization for the operation of the Kerr Project and to securing financial backing for the acquisition. Goals achieved:   • Establishing an efficient and economic conveyance process, and transition plans • Establishing an efficient and effective Tribal wholesale power generation corporation to manage the plant, balance the resources, and market the power from the Kerr Project. The success of this project, which is essential to the Tribes' acquisition of the Kerr Hydroelectric facility, helps to address poverty and unemployment among Tribal members by generating a number of highly skilled and specialized, high-paying Tribal member jobs and providing a stream of income from power sales that will be used for Tribal economic development. Objectives achieved: The project supported the position of Power Plant Operations and Maintenance engineer and power marketing coordinator positions. These are key, in part, to the Tribes' successful acquisition and operation of the facility because they will enable to the Tribes to gain the very specialized expertise required to operate a large wholesale power generation facility. Specific objectives include: Objective 1: Hire a power marketing coordinator to develop and coordinate the appropriate power marketing strategy for the sale of power generated by the operation of Kerr Dam. Objective 2: Hire a staff engineer.« less

  15. Breathing synchronized assessment of the chest hemodynamics: application to gamma and MR angiography

    NASA Astrophysics Data System (ADS)

    Eclancher, Bernard; Demangeat, Jean-Louis; Germain, Philippe; Baruthio, Joseph

    2003-05-01

    The project was to assess by gamma and MR angiography the bulk variations of chest blood volume related to deep and slow breathing movements. The acquisitions were performed at constant intervals on the widely moving system, without cardiac gating. Two fast enough modalities were used: a gamma-stethoscope working at 30 msec intervals for bulk volumic detection (of 99Tc labelled red cells), and MR imaging at 0.5 sec intervals well depicting displacements but not yet performing true angiography. The third modality yielding quantitative imaging was the scintillation gamma camera, but which required 30 sec signal acquisitions for each image. Frames were acquired at 1 sec intervals for up to 30 breathing cycles, and later sorted with double (inspiration and expiration) synchronization for the reconstruction of an average breathing cycle. Convergent results were obtained from the three angiographic modalities, confirming that the deep breathing movements produced inspiratory increases in bulk blood volume and caudal-median displacement of heart and great vessels, and expiratory decreases in blood volume and cranial-left displacement of heart and great vessels. Deep and slow breathing contributed effectively to thoracic blood pumping. The design of a 64x64 channels collimator has been undertaken to speed up the scintillation camera imaging acquisitions.

  16. Results of SEI Independent Research and Development Projects and Report on Emerging Technologies and Technology Trends

    DTIC Science & Technology

    2005-12-01

    W. Collins Peter Feiler John Goodenough Aaron Greenhouse Jorgen Hansson Alan R . Hevner John Hudak Angel Jordan Rick Kazman Richard C. Linger...John Goodenough Aaron Greenhouse Jorgen Hansson Alan R . Hevner John Hudak Angel Jordan Rick Kazman Richard C. Linger Mark G. Pleszkoch Stacy J...operability, sustainability, software R &D, metrics for acquisition, acquisition management, and commercial off-the-shelf products. The IR&D projects conducted

  17. Robust Depth Image Acquisition Using Modulated Pattern Projection and Probabilistic Graphical Models

    PubMed Central

    Kravanja, Jaka; Žganec, Mario; Žganec-Gros, Jerneja; Dobrišek, Simon; Štruc, Vitomir

    2016-01-01

    Depth image acquisition with structured light approaches in outdoor environments is a challenging problem due to external factors, such as ambient sunlight, which commonly affect the acquisition procedure. This paper presents a novel structured light sensor designed specifically for operation in outdoor environments. The sensor exploits a modulated sequence of structured light projected onto the target scene to counteract environmental factors and estimate a spatial distortion map in a robust manner. The correspondence between the projected pattern and the estimated distortion map is then established using a probabilistic framework based on graphical models. Finally, the depth image of the target scene is reconstructed using a number of reference frames recorded during the calibration process. We evaluate the proposed sensor on experimental data in indoor and outdoor environments and present comparative experiments with other existing methods, as well as commercial sensors. PMID:27775570

  18. United States Air Force Computer-Aided Acquisition and Logistics Support (CALS) Evolution of Computer Integrated Manufacturing (CIM) Technologies

    DTIC Science & Technology

    1988-11-01

    Manufacturing System 22 4. Similar Parts Based Shape or Manufactuting Process 24 5. Projected Annual Unit Robot Sales and Installed Base Through 1992 30 6. U.S...effort needed to perform personnel, product design, marketing , and advertising, and finance tasks of the firm. Level III controls the resource...planning and accounting functions of the firm. Systems at this level support purchasing, accounts payable, accounts receivable, master scheduling and sales

  19. Characterizing probe performance in the aberration corrected STEM.

    PubMed

    Batson, P E

    2006-01-01

    Sub-Angstrom imaging using the 120 kV IBM STEM is now routine if the probe optics is carefully controlled and fully characterized. However, multislice simulation using at least a frozen phonon approximation is required to understand the Annular Dark Field image contrast. Analysis of silicon dumbbell structures in the [110] and [211] projections illustrate this finding. Using fast image acquisition, atomic movement appears ubiquitous under the electron beam, and may be useful to illuminate atomic level processes.

  20. Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2010-07-21

    PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,Library of... NGSS ). ICGS was awarded an indefinite delivery, indefinite quantity (ID/IQ) contract for the Deepwater program that included a five-year baseline term...be conducted by SPAWAR [the Navy’s Space and Naval Warfare Systems Command] and in April 2009. We continue to build on lessons learned and are

  1. An Analysis of U.S. Army Health Hazard Assessments During the Acquisition of Military Materiel

    DTIC Science & Technology

    2010-06-03

    GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S...administrative controls and the use of personal protective equipment (PPE) (Milz, Conrad, & Soule , 2003). Engineering controls can eliminate hazards through...facilitate hazard free designs or conditions (Milz, Conrad, & Soule , 2003). Engineering control measures can serve to 7 minimize hazards where they

  2. Toward Affordable Systems: Portfolio Analysis and Management for Army Science and Technology Programs

    DTIC Science & Technology

    2009-01-01

    PROGRAM ELEMENT NUMBER 6. AUTHOR (S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Rand...Decision Authority MDAP major defense acquisition program Abbreviations xxvii MIC marginal implementation cost MOMC marginal operating and...the Milestone Decision Authority (MDA).1 1 This section is based on U.S. Army, 2003, pp. 30–33. This 2003 Army document had taken into account the

  3. Notification: Methods for Procuring Supplies and Services Under Simplified Acquisition Procedures

    EPA Pesticide Factsheets

    Project #OA-FY15-0193, June 18, 2015. The EPA OIG plans to begin the preliminary research phase of auditing the methods used in procuring supplies and services under simplified acquisition procedures.

  4. Stress Modulates Instrumental Learning Performances in Horses (Equus caballus) in Interaction with Temperament

    PubMed Central

    Valenchon, Mathilde; Lévy, Frédéric; Prunier, Armelle; Moussu, Chantal; Calandreau, Ludovic; Lansade, Léa

    2013-01-01

    The present study investigates how the temperament of the animal affects the influence of acute stress on the acquisition and reacquisition processes of a learning task. After temperament was assessed, horses were subjected to a stressor before or after the acquisition session of an instrumental task. Eight days later, horses were subjected to a reacquisition session without any stressor. Stress before acquisition tended to enhance the number of successes at the beginning of the acquisition session. Eight days later, during the reacquisition session, contrary to non-stressed animals, horses stressed after acquisition, and, to a lesser extent, horses stressed before acquisition, did not improve their performance between acquisition and reacquisition sessions. Temperament influenced learning performances in stressed horses only. Particularly, locomotor activity improved performances whereas fearfulness impaired them under stressful conditions. Results suggest that direct exposure to a stressor tended to increase acquisition performances, whereas a state of stress induced by the memory of a stressor, because it has been previously associated with the learning context, impaired reacquisition performances. The negative effect of a state of stress on reacquisition performances appeared to be stronger when exposure to the stressor occurred after rather than before the acquisition session. Temperament had an impact on both acquisition and reacquisition processes, but under stressful conditions only. These results suggest that stress is necessary to reveal the influence of temperament on cognitive performances. PMID:23626801

  5. Breathing motion compensated reconstruction for C-arm cone beam CT imaging: initial experience based on animal data

    NASA Astrophysics Data System (ADS)

    Schäfer, D.; Lin, M.; Rao, P. P.; Loffroy, R.; Liapi, E.; Noordhoek, N.; Eshuis, P.; Radaelli, A.; Grass, M.; Geschwind, J.-F. H.

    2012-03-01

    C-arm based tomographic 3D imaging is applied in an increasing number of minimal invasive procedures. Due to the limited acquisition speed for a complete projection data set required for tomographic reconstruction, breathing motion is a potential source of artifacts. This is the case for patients who cannot comply breathing commands (e.g. due to anesthesia). Intra-scan motion estimation and compensation is required. Here, a scheme for projection based local breathing motion estimation is combined with an anatomy adapted interpolation strategy and subsequent motion compensated filtered back projection. The breathing motion vector is measured as a displacement vector on the projections of a tomographic short scan acquisition using the diaphragm as a landmark. Scaling of the displacement to the acquisition iso-center and anatomy adapted volumetric motion vector field interpolation delivers a 3D motion vector per voxel. Motion compensated filtered back projection incorporates this motion vector field in the image reconstruction process. This approach is applied in animal experiments on a flat panel C-arm system delivering improved image quality (lower artifact levels, improved tumor delineation) in 3D liver tumor imaging.

  6. 44 CFR 80.11 - Project eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project eligibility. 80.11... RELOCATION FOR OPEN SPACE Requirements Prior to Award § 80.11 Project eligibility. (a) Voluntary participation. Eligible acquisition projects are those where the property owner participates voluntarily, and...

  7. 44 CFR 80.11 - Project eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project eligibility. 80.11... RELOCATION FOR OPEN SPACE Requirements Prior to Award § 80.11 Project eligibility. (a) Voluntary participation. Eligible acquisition projects are those where the property owner participates voluntarily, and...

  8. 44 CFR 80.11 - Project eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project eligibility. 80.11... RELOCATION FOR OPEN SPACE Requirements Prior to Award § 80.11 Project eligibility. (a) Voluntary participation. Eligible acquisition projects are those where the property owner participates voluntarily, and...

  9. 44 CFR 80.11 - Project eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Project eligibility. 80.11... RELOCATION FOR OPEN SPACE Requirements Prior to Award § 80.11 Project eligibility. (a) Voluntary participation. Eligible acquisition projects are those where the property owner participates voluntarily, and...

  10. 36 CFR 64.5 - Eligible projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Eligible projects. 64.5... Eligible projects. (a) Abandoned railroad projects will be for recreation and/or conservation purposes including the acquisition of the rights-of-way involved and will be sponsored by a project applicant who has...

  11. 14 CFR 151.39 - Project eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Project eligibility. 151.39 Section 151.39... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.39 Project eligibility. (a) A project for construction or land acquisition may not be approved under subparts B and C unless...

  12. 32 CFR 644.4 - Reservoir projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Reservoir projects. 644.4 Section 644.4 National... HANDBOOK Project Planning Civil Works § 644.4 Reservoir projects. (a) Joint land acquisition policy for reservoir projects. The joint policies of the Department of the Interior and the Department of the Army...

  13. 14 CFR 151.39 - Project eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Project eligibility. 151.39 Section 151.39... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.39 Project eligibility. (a) A project for construction or land acquisition may not be approved under subparts B and C unless...

  14. 36 CFR 64.5 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Eligible projects. 64.5... Eligible projects. (a) Abandoned railroad projects will be for recreation and/or conservation purposes including the acquisition of the rights-of-way involved and will be sponsored by a project applicant who has...

  15. 36 CFR 64.5 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Eligible projects. 64.5... Eligible projects. (a) Abandoned railroad projects will be for recreation and/or conservation purposes including the acquisition of the rights-of-way involved and will be sponsored by a project applicant who has...

  16. 32 CFR 644.4 - Reservoir projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Reservoir projects. 644.4 Section 644.4 National... HANDBOOK Project Planning Civil Works § 644.4 Reservoir projects. (a) Joint land acquisition policy for reservoir projects. The joint policies of the Department of the Interior and the Department of the Army...

  17. 14 CFR 151.39 - Project eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Project eligibility. 151.39 Section 151.39... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.39 Project eligibility. (a) A project for construction or land acquisition may not be approved under subparts B and C unless...

  18. 36 CFR 64.5 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Eligible projects. 64.5... Eligible projects. (a) Abandoned railroad projects will be for recreation and/or conservation purposes including the acquisition of the rights-of-way involved and will be sponsored by a project applicant who has...

  19. 32 CFR 644.4 - Reservoir projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Reservoir projects. 644.4 Section 644.4 National... HANDBOOK Project Planning Civil Works § 644.4 Reservoir projects. (a) Joint land acquisition policy for reservoir projects. The joint policies of the Department of the Interior and the Department of the Army...

  20. Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-66)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    2001-10-04

    BPA proposes to fund four projects that will enhance instream flow in several subbasins throughout Oregon. The Oregon Water Trust acquires existing water rights on a voluntary basis through purchase, gift and water conservation projects, and converts the rights to instream flow under Oregon state water law. The proposed projects are all related to an on-going program of water rights acquisition in the Columbia Plateau Basin (Deschutes, John Day, Umatilla and Walla Walla subbasins) and the Columbia Gorge Basin (Fifteenmile subbasin) by the Oregon Water Trust (OWT). The current funding cycle extends through fiscal year 2001. Additional funding is currentlymore » being sought for fiscal years 2002-2004. Specific acquisition transactions are evaluated throughout the duration of the project, so on-the-ground impacts may only be estimated. The proposed project is an extension of previous water rights acquisition projects within the subject subbasins, dating back to 1994. The objective of the proposed projects in the next cycle, 2002 through 2004, is to acquire a total of approximately 12.6 cfs on tributary streams within the subbasins. The target level of water rights acquired, by subbasin, are as follows: Deschutes subbasin--2.0 cfs; Fifteenmile subbasin--1.4 cfs; John Day subbasin--2.0 cfs; Umatilla subbasin--1.0 cfs; Walla Walla subbasin--4.2 cfs; and newly prioritized streams within the region--2.0 cfs.« less

  1. Advanced Post-Irradiation Examination Capabilities Alternatives Analysis Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeff Bryan; Bill Landman; Porter Hill

    2012-12-01

    An alternatives analysis was performed for the Advanced Post-Irradiation Capabilities (APIEC) project in accordance with the U.S. Department of Energy (DOE) Order DOE O 413.3B, “Program and Project Management for the Acquisition of Capital Assets”. The Alternatives Analysis considered six major alternatives: ? No Action ? Modify Existing DOE Facilities – capabilities distributed among multiple locations ? Modify Existing DOE Facilities – capabilities consolidated at a few locations ? Construct New Facility ? Commercial Partnership ? International Partnerships Based on the alternatives analysis documented herein, it is recommended to DOE that the advanced post-irradiation examination capabilities be provided by amore » new facility constructed at the Materials and Fuels Complex at the Idaho National Laboratory.« less

  2. Actively triggered 4d cone-beam CT acquisition.

    PubMed

    Fast, Martin F; Wisotzky, Eric; Oelfke, Uwe; Nill, Simeon

    2013-09-01

    4d cone-beam computed tomography (CBCT) scans are usually reconstructed by extracting the motion information from the 2d projections or an external surrogate signal, and binning the individual projections into multiple respiratory phases. In this "after-the-fact" binning approach, however, projections are unevenly distributed over respiratory phases resulting in inefficient utilization of imaging dose. To avoid excess dose in certain respiratory phases, and poor image quality due to a lack of projections in others, the authors have developed a novel 4d CBCT acquisition framework which actively triggers 2d projections based on the forward-predicted position of the tumor. The forward-prediction of the tumor position was independently established using either (i) an electromagnetic (EM) tracking system based on implanted EM-transponders which act as a surrogate for the tumor position, or (ii) an external motion sensor measuring the chest-wall displacement and correlating this external motion to the phase-shifted diaphragm motion derived from the acquired images. In order to avoid EM-induced artifacts in the imaging detector, the authors devised a simple but effective "Faraday" shielding cage. The authors demonstrated the feasibility of their acquisition strategy by scanning an anthropomorphic lung phantom moving on 1d or 2d sinusoidal trajectories. With both tumor position devices, the authors were able to acquire 4d CBCTs free of motion blurring. For scans based on the EM tracking system, reconstruction artifacts stemming from the presence of the EM-array and the EM-transponders were greatly reduced using newly developed correction algorithms. By tuning the imaging frequency independently for each respiratory phase prior to acquisition, it was possible to harmonize the number of projections over respiratory phases. Depending on the breathing period (3.5 or 5 s) and the gantry rotation time (4 or 5 min), between ∼90 and 145 projections were acquired per respiratory phase resulting in a dose of ∼1.7-2.6 mGy per respiratory phase. Further dose savings and decreases in the scanning time are possible by acquiring only a subset of all respiratory phases, for example, peak-exhale and peak-inhale only scans. This study is the first experimental demonstration of a new 4d CBCT acquisition paradigm in which imaging dose is efficiently utilized by actively triggering only those projections that are desired for the reconstruction process.

  3. 16. Perimeter acquisition radar building room #102, electrical equipment room; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Perimeter acquisition radar building room #102, electrical equipment room; the prime power distribution system. Excellent example of endulum-types shock isolation. The grey cabinet and barrel assemble is part of the polychlorinated biphenyl (PCB) retrofill project - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  4. Will Empowerment of USAF Program Managers Mitigate the Acquisitions Crisis

    DTIC Science & Technology

    2016-06-10

    FAR Federal Acquisition Regulations GAO Government Accountability Office MDAP Major Defense Acquisition Program USAF United States Air Force ix...actually run the project. The Government Accountability Office (GAO),2 along with many other organizations, including Congress in their 2016 National...1 Government Accountability Office (GAO), GAO-06-110, Best Practices: Better Support of Weapons Systems Program Managers Needed to

  5. Due Diligence Processes for Public Acquisition of Mining-Impacted Landscapes

    NASA Astrophysics Data System (ADS)

    Martin, E.; Monohan, C.; Keeble-Toll, A. K.

    2016-12-01

    The acquisition of public land is critical for achieving conservation and habitat goals in rural regions projected to experience continuously high rates of population growth. To ensure that public funds are utilized responsibly in the purchase of conservation easements appropriate due diligence processes must be established that limit landowner liability post-acquisition. Traditional methods of characterizing contamination in regions where legacy mining activities were prevalent may not utilize current scientific knowledge and understanding of contaminant fate, transport and bioavailability, and therefore are likely to have type two error. Agency prescribed assessment methods utilized under CERLA in many cases fail to detect contamination that presents liability issues by failing to require water quality sampling that would reveal offsite transport potential of contaminants posing human health risks, including mercury. Historical analysis can be used to inform judgmental sampling to identify hotspots and contaminants of concern. Land acquisition projects at two historic mine sites in Nevada County, California, the Champion Mine Complex and the Black Swan Preserve have established the necessity of re-thinking due diligence processes for mining-impacted landscapes. These pilot projects demonstrate that pre-acquisition assessment in the Gold Country must include judgmental sampling and evaluation of contaminant transport. Best practices using the current scientific knowledge must be codified by agencies, consultants, and NGOs in order to ensure responsible use of public funds and to safeguard public health.

  6. Target acquisition modeling over the exact optical path: extending the EOSTAR TDA with the TOD sensor performance model

    NASA Astrophysics Data System (ADS)

    Dijk, J.; Bijl, P.; Oppeneer, M.; ten Hove, R. J. M.; van Iersel, M.

    2017-10-01

    The Electro-Optical Signal Transmission and Ranging (EOSTAR) model is an image-based Tactical Decision Aid (TDA) for thermal imaging systems (MWIR/LWIR) developed for a sea environment with an extensive atmosphere model. The Triangle Orientation Discrimination (TOD) Target Acquisition model calculates the sensor and signal processing effects on a set of input triangle test pattern images, judges their orientation using humans or a Human Visual System (HVS) model and derives the system image quality and operational field performance from the correctness of the responses. Combination of the TOD model and EOSTAR, basically provides the possibility to model Target Acquisition (TA) performance over the exact path from scene to observer. In this method ship representative TOD test patterns are placed at the position of the real target, subsequently the combined effects of the environment (atmosphere, background, etc.), sensor and signal processing on the image are calculated using EOSTAR and finally the results are judged by humans. The thresholds are converted into Detection-Recognition-Identification (DRI) ranges of the real target. In experiments is shown that combination of the TOD model and the EOSTAR model is indeed possible. The resulting images look natural and provide insight in the possibilities of combining the two models. The TOD observation task can be done well by humans, and the measured TOD is consistent with analytical TOD predictions for the same camera that was modeled in the ECOMOS project.

  7. SIMNET: an insider's perspective

    NASA Astrophysics Data System (ADS)

    Cosby, L. Neale

    1995-04-01

    Simulator Networking (SIMNET) began with a young scientist's idea but has ended up changing an entire industry and the way the military does business. And the story isn't over yet. SIMNET began as an advanced research project aimed at developing a core technology for networking hundreds of affordable simulators worldwide in real time to practice joint collective warfighting skills and to develop better acquisition practices. It was a daring project that proved the Advanced Research Projects Agency (ARPA) mission of doing "what cannot be done." It was a serious threat to the existing simulation industry. As it turned out, the government got what it wanted—a low-cost, high-performance virtual simulation capability that could be proliferated like consumer electronics. This paper provides an insider's view of the program history, identifies some possible lessons for future developers, and opines future growth for SIMNET technology.

  8. 32 CFR 3.4 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulation. Project Manager. The government manager for the prototype project. Qualified Independent Public... the Army—Assistant Secretary of the Army (Acquisition, Logistics and Technology); (2) Department of...

  9. Low-dose x-ray tomography through a deep convolutional neural network

    DOE PAGES

    Yang, Xiaogang; De Andrade, Vincent; Scullin, William; ...

    2018-02-07

    Synchrotron-based X-ray tomography offers the potential of rapid large-scale reconstructions of the interiors of materials and biological tissue at fine resolution. However, for radiation sensitive samples, there remain fundamental trade-offs between damaging samples during longer acquisition times and reducing signals with shorter acquisition times. We present a deep convolutional neural network (CNN) method that increases the acquired X-ray tomographic signal by at least a factor of 10 during low-dose fast acquisition by improving the quality of recorded projections. Short exposure time projections enhanced with CNN show similar signal to noise ratios as compared with long exposure time projections and muchmore » lower noise and more structural information than low-dose fats acquisition without CNN. We optimized this approach using simulated samples and further validated on experimental nano-computed tomography data of radiation sensitive mouse brains acquired with a transmission X-ray microscopy. We demonstrate that automated algorithms can reliably trace brain structures in datasets collected with low dose-CNN. As a result, this method can be applied to other tomographic or scanning based X-ray imaging techniques and has great potential for studying faster dynamics in specimens.« less

  10. Low-dose x-ray tomography through a deep convolutional neural network

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, Xiaogang; De Andrade, Vincent; Scullin, William

    Synchrotron-based X-ray tomography offers the potential of rapid large-scale reconstructions of the interiors of materials and biological tissue at fine resolution. However, for radiation sensitive samples, there remain fundamental trade-offs between damaging samples during longer acquisition times and reducing signals with shorter acquisition times. We present a deep convolutional neural network (CNN) method that increases the acquired X-ray tomographic signal by at least a factor of 10 during low-dose fast acquisition by improving the quality of recorded projections. Short exposure time projections enhanced with CNN show similar signal to noise ratios as compared with long exposure time projections and muchmore » lower noise and more structural information than low-dose fats acquisition without CNN. We optimized this approach using simulated samples and further validated on experimental nano-computed tomography data of radiation sensitive mouse brains acquired with a transmission X-ray microscopy. We demonstrate that automated algorithms can reliably trace brain structures in datasets collected with low dose-CNN. As a result, this method can be applied to other tomographic or scanning based X-ray imaging techniques and has great potential for studying faster dynamics in specimens.« less

  11. A new DoD initiative: the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program

    NASA Astrophysics Data System (ADS)

    Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.

    2008-07-01

    In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.

  12. The effects of iterative reconstruction in CT on low-contrast liver lesion volumetry: a phantom study

    NASA Astrophysics Data System (ADS)

    Li, Qin; Berman, Benjamin P.; Schumacher, Justin; Liang, Yongguang; Gavrielides, Marios A.; Yang, Hao; Zhao, Binsheng; Petrick, Nicholas

    2017-03-01

    Tumor volume measured from computed tomography images is considered a biomarker for disease progression or treatment response. The estimation of the tumor volume depends on the imaging system parameters selected, as well as lesion characteristics. In this study, we examined how different image reconstruction methods affect the measurement of lesions in an anthropomorphic liver phantom with a non-uniform background. Iterative statistics-based and model-based reconstructions, as well as filtered back-projection, were evaluated and compared in this study. Statistics-based and filtered back-projection yielded similar estimation performance, while model-based yielded higher precision but lower accuracy in the case of small lesions. Iterative reconstructions exhibited higher signal-to-noise ratio but slightly lower contrast of the lesion relative to the background. A better understanding of lesion volumetry performance as a function of acquisition parameters and lesion characteristics can lead to its incorporation as a routine sizing tool.

  13. Evaluation of PROforma as a language for implementing medical guidelines in a practical context

    PubMed Central

    Sutton, David R; Taylor, Paul; Earle, Kenneth

    2006-01-01

    Background PROforma is one of several languages that allow clinical guidelines to be expressed in a computer-interpretable manner. How these languages should be compared, and what requirements they should meet, are questions that are being actively addressed by a community of interested researchers. Methods We have developed a system to allow hypertensive patients to be monitored and assessed without visiting their GPs (except in the most urgent cases). Blood pressure measurements are performed at the patients' pharmacies and a web-based system, created using PROforma, makes recommendations for continued monitoring, and/or changes in medication. The recommendations and measurements are transmitted electronically to a practitioner with authority to issue and change prescriptions. We evaluated the use of PROforma during the knowledge acquisition, analysis, design and implementation of this system. The analysis focuses on the logical adequacy, heuristic power, notational convenience, and explanation support provided by the PROforma language. Results PROforma proved adequate as a language for the implementation of the clinical reasoning required by this project. However a lack of notational convenience led us to use UML activity diagrams, rather than PROforma process descriptions, to create the models that were used during the knowledge acquisition and analysis phases of the project. These UML diagrams were translated into PROforma during the implementation of the project. Conclusion The experience accumulated during this study highlighted the importance of structure preserving design, that is to say that the models used in the design and implementation of a knowledge-based system should be structurally similar to those created during knowledge acquisition and analysis. Ideally the same language should be used for all of these models. This means that great importance has to be attached to the notational convenience of these languages, by which we mean the ease with which they can be read, written, and understood by human beings. The importance of notational convenience arises from the fact that a language used during knowledge acquisition and analysis must be intelligible to the potential users of a system, and to the domain experts who provide the knowledge that will be used in its construction. PMID:16597341

  14. Evaluation of PROforma as a language for implementing medical guidelines in a practical context.

    PubMed

    Sutton, David R; Taylor, Paul; Earle, Kenneth

    2006-04-05

    PROforma is one of several languages that allow clinical guidelines to be expressed in a computer-interpretable manner. How these languages should be compared, and what requirements they should meet, are questions that are being actively addressed by a community of interested researchers. We have developed a system to allow hypertensive patients to be monitored and assessed without visiting their GPs (except in the most urgent cases). Blood pressure measurements are performed at the patients' pharmacies and a web-based system, created using PROforma, makes recommendations for continued monitoring, and/or changes in medication. The recommendations and measurements are transmitted electronically to a practitioner with authority to issue and change prescriptions. We evaluated the use of PROforma during the knowledge acquisition, analysis, design and implementation of this system. The analysis focuses on the logical adequacy, heuristic power, notational convenience, and explanation support provided by the PROforma language. PROforma proved adequate as a language for the implementation of the clinical reasoning required by this project. However a lack of notational convenience led us to use UML activity diagrams, rather than PROforma process descriptions, to create the models that were used during the knowledge acquisition and analysis phases of the project. These UML diagrams were translated into PROforma during the implementation of the project. The experience accumulated during this study highlighted the importance of structure preserving design, that is to say that the models used in the design and implementation of a knowledge-based system should be structurally similar to those created during knowledge acquisition and analysis. Ideally the same language should be used for all of these models. This means that great importance has to be attached to the notational convenience of these languages, by which we mean the ease with which they can be read, written, and understood by human beings. The importance of notational convenience arises from the fact that a language used during knowledge acquisition and analysis must be intelligible to the potential users of a system, and to the domain experts who provide the knowledge that will be used in its construction.

  15. A database of 629 English compound words: ratings of familiarity, lexeme meaning dominance, semantic transparency, age of acquisition, imageability, and sensory experience.

    PubMed

    Juhasz, Barbara J; Lai, Yun-Hsuan; Woodcock, Michelle L

    2015-12-01

    Since the work of Taft and Forster (1976), a growing literature has examined how English compound words are recognized and organized in the mental lexicon. Much of this research has focused on whether compound words are decomposed during recognition by manipulating the word frequencies of their lexemes. However, many variables may impact morphological processing, including relational semantic variables such as semantic transparency, as well as additional form-related and semantic variables. In the present study, ratings were collected on 629 English compound words for six variables [familiarity, age of acquisition (AoA), semantic transparency, lexeme meaning dominance (LMD), imageability, and sensory experience ratings (SER)]. All of the compound words selected for this study are contained within the English Lexicon Project (Balota et al., 2007), which made it possible to use a regression approach to examine the predictive power of these variables for lexical decision and word naming performance. Analyses indicated that familiarity, AoA, imageability, and SER were all significant predictors of both lexical decision and word naming performance when they were added separately to a model containing the length and frequency of the compounds, as well as the lexeme frequencies. In addition, rated semantic transparency also predicted lexical decision performance. The database of English compound words should be beneficial to word recognition researchers who are interested in selecting items for experiments on compound words, and it will also allow researchers to conduct further analyses using the available data combined with word recognition times included in the English Lexicon Project.

  16. Direct Satellite Data Acquisition and its Application for Large -scale Monitoring Projects in Russia

    NASA Astrophysics Data System (ADS)

    Gershenzon, O.

    2011-12-01

    ScanEx RDC created an infrastructure (ground stations network) to acquire and process remote sensing data from different satellites: Terra, Aqua, Landsat, IRS-P5/P6, SPOT 4/5, FORMOSAT-2, EROS A/B, RADARSAT-1/2, ENVISAT-1. It owns image archives from these satellites as well as from SPOT-2 and CARTOSAT-2. ScanEx RDC builds and delivers remote sensing ground stations (working with up to 15 satellites); and owns the ground stations network to acquire data for Russia and surrounding territory. ScanEx stations are the basic component in departmental networks of remote sensing data acquisition for different state authorities (Roshydromet, Ministry of Natural Recourses, Emercom) and University- based remote sensing data acquisition and processing centers in Russia and abroad. ScanEx performs large-scale projects in collaboration with government agencies to monitor forests, floods, fires, sea surface pollution, and ice situation in Northern Russia. During 2010-2011 ScanEx conducted daily monitoring of wild fires in Russia detecting and registering thermal anomalies using data from Terra, Aqua, Landsat and SPOT satellites. Detailed SPOT 4/5 data is used to analyze burnt areas and to assess damage caused by fire. Satellite data along with other information about fire situation in Russia was daily updated and published via free-access Internet geoportal. A few projects ScanEx conducted together with environmental NGO. Project "Satellite monitoring of Especially Protected Natural Areas of Russia and its results visualization on geoportal was conducted in cooperation with NGO "Transparent World". The project's goal was to observe natural phenomena and economical activity, including illegal, by means of Earth remote sensing data. Monitoring is based on multi-temporal optical space imagery of different spatial resolution. Project results include detection of anthropogenic objects that appeared in the vicinity or even within the border of natural territories, that have never been touched by civilization before. "Satellite based technology for monitoring ship ice navigation and its influence on seal population in the White Sea" project was conducted in cooperation with IFAW. Results of the near real-time satellite monitoring were published on specially designed open web source. This allows project team to put image interpretation results in near real-time mode for on-line access to all interesting external stakeholders. During project realization Envisat, Radarsat, SPOT, EROS space images were used. In addition the methodology to locate seal population using EROS space images was developed. This methodology is based on detection of vital functions and displacement traces. Environmental satellite monitoring of Northern Russian territory and Arctic seas projects where the results are published via free-access Internet geoportal has a significant social importance.

  17. 49 CFR 266.7 - Project eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Project eligibility. 266.7 Section 266.7... TRANSPORTATION ACT § 266.7 Project eligibility. (a) Rail service continuation assistance, acquisition assistance and substitute service assistance. A project is eligible for assistance under § 266.3(a) (1), (2), and...

  18. 49 CFR 266.7 - Project eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Project eligibility. 266.7 Section 266.7... TRANSPORTATION ACT § 266.7 Project eligibility. (a) Rail service continuation assistance, acquisition assistance and substitute service assistance. A project is eligible for assistance under § 266.3(a) (1), (2), and...

  19. 49 CFR 266.7 - Project eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Project eligibility. 266.7 Section 266.7... TRANSPORTATION ACT § 266.7 Project eligibility. (a) Rail service continuation assistance, acquisition assistance and substitute service assistance. A project is eligible for assistance under § 266.3(a) (1), (2), and...

  20. 49 CFR 266.7 - Project eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Project eligibility. 266.7 Section 266.7... TRANSPORTATION ACT § 266.7 Project eligibility. (a) Rail service continuation assistance, acquisition assistance and substitute service assistance. A project is eligible for assistance under § 266.3(a) (1), (2), and...

  1. 49 CFR 266.7 - Project eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Project eligibility. 266.7 Section 266.7... TRANSPORTATION ACT § 266.7 Project eligibility. (a) Rail service continuation assistance, acquisition assistance and substitute service assistance. A project is eligible for assistance under § 266.3(a) (1), (2), and...

  2. Comparison of digital breast tomosynthesis and 2D digital mammography using a hybrid performance test

    NASA Astrophysics Data System (ADS)

    Cockmartin, Lesley; Marshall, Nicholas W.; Van Ongeval, Chantal; Aerts, Gwen; Stalmans, Davina; Zanca, Federica; Shaheen, Eman; De Keyzer, Frederik; Dance, David R.; Young, Kenneth C.; Bosmans, Hilde

    2015-05-01

    This paper introduces a hybrid method for performing detection studies in projection image based modalities, based on image acquisitions of target objects and patients. The method was used to compare 2D mammography and digital breast tomosynthesis (DBT) in terms of the detection performance of spherical densities and microcalcifications. The method starts with the acquisition of spheres of different glandular equivalent densities and microcalcifications of different sizes immersed in a homogeneous breast tissue simulating medium. These target objects are then segmented and the subsequent templates are fused in projection images of patients and processed or reconstructed. This results in hybrid images with true mammographic anatomy and clinically relevant target objects, ready for use in observer studies. The detection study of spherical densities used 108 normal and 178 hybrid 2D and DBT images; 156 normal and 321 hybrid images were used for the microcalcifications. Seven observers scored the presence/absence of the spheres/microcalcifications in a square region via a 5-point confidence rating scale. Detection performance in 2D and DBT was compared via ROC analysis with sub-analyses for the density of the spheres, microcalcification size, breast thickness and z-position. The study was performed on a Siemens Inspiration tomosynthesis system using patient acquisitions with an average age of 58 years and an average breast thickness of 53 mm providing mean glandular doses of 1.06 mGy (2D) and 2.39 mGy (DBT). Study results showed that breast tomosynthesis (AUC = 0.973) outperformed 2D (AUC = 0.831) for the detection of spheres (p  <  0.0001) and this applied for all spherical densities and breast thicknesses. By way of contrast, DBT was worse than 2D for microcalcification detection (AUC2D = 0.974, AUCDBT = 0.838, p  <  0.0001), with significant differences found for all sizes (150-354 µm), for breast thicknesses above 40 mm and for heights above the detector of 20 mm and above. In conclusion, the hybrid method was successfully used to produce images for a detection study; results showed breast tomosynthesis outperformed 2D for spherical densities while further optimization of DBT for microcalcifications is suggested.

  3. Data acquisition and analysis of the UNCOSS underwater explosive neutron sensor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carasco, Cedric; Eleon, Cyrille; Perot, Bertrand

    2012-08-15

    The purpose of the FP7 UNCOSS project (Underwater Coastal Sea Surveyor, http://www.uncoss-project.org) is to develop a neutron-based underwater explosive sensor to detect unexploded ordnance lying on the sea bottom. The Associated Particle Technique is used to focus the inspection on a suspicious object located by optical and electromagnetic sensors and to determine if there is an explosive charge inside. This paper presents the data acquisition electronics and data analysis software which have been developed for this project. A field programmable gate array that digitizes and processes the signal allows to perform precise time-of-flight and gamma-ray energy measurements. The gamma-ray spectramore » are unfolded into pure elemental count proportions, mainly C, N, O, Fe, Al, Si, and Ca. The C, N, and O count fractions are converted into chemical proportions, taking into account the gamma-ray production cross sections, as well as neutron and photon attenuation in the different shields between the ROV (Remotely Operated Vehicle) and the explosive, such as the explosive iron shell, seawater, and ROV envelop. A two-dimensional (2D) barycentric representation of the C, N, and O proportions is built from their chemical ratios, and a 2D likelihood map is built from the associated statistical and systematic uncertainties. The threat level is evaluated from the best matching materials of a database including explosives. (authors)« less

  4. 48 CFR 219.7106 - Performance reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Performance reviews. 219.7106 Section 219.7106 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM... Performance reviews. The Defense Contract Management Agency will conduct annual performance reviews of all...

  5. 48 CFR 219.7106 - Performance reviews.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Performance reviews. 219.7106 Section 219.7106 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM... Performance reviews. The Defense Contract Management Agency will conduct annual performance reviews of all...

  6. 48 CFR 36.604 - Performance evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Performance evaluation. 36.604 Section 36.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL... Performance evaluation. See 42.1502(f) for the requirements for preparing past performance evaluations for...

  7. 48 CFR 36.604 - Performance evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Performance evaluation. 36.604 Section 36.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL... Performance evaluation. See 42.1502(f) for the requirements for preparing past performance evaluations for...

  8. 48 CFR 36.604 - Performance evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance evaluation. 36.604 Section 36.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL... Performance evaluation. See 42.1502(f) for the requirements for preparing past performance evaluations for...

  9. 48 CFR 36.604 - Performance evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Performance evaluation. 36.604 Section 36.604 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL... Performance evaluation. See 42.1502(f) for the requirements for preparing past performance evaluations for...

  10. 48 CFR 219.7106 - Performance reviews.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Performance reviews. 219.7106 Section 219.7106 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM... Performance reviews. The Defense Contract Management Agency will conduct annual performance reviews of all...

  11. 48 CFR 219.7106 - Performance reviews.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Performance reviews. 219.7106 Section 219.7106 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM... Performance reviews. The Defense Contract Management Agency will conduct annual performance reviews of all...

  12. Evaluation of Parallel and Fan-Beam Data Acquisition Geometries and Strategies for Myocardial SPECT Imaging

    NASA Astrophysics Data System (ADS)

    Qi, Yujin; Tsui, B. M. W.; Gilland, K. L.; Frey, E. C.; Gullberg, G. T.

    2004-06-01

    This study evaluates myocardial SPECT images obtained from parallel-hole (PH) and fan-beam (FB) collimator geometries using both circular-orbit (CO) and noncircular-orbit (NCO) acquisitions. A newly developed 4-D NURBS-based cardiac-torso (NCAT) phantom was used to simulate the /sup 99m/Tc-sestamibi uptakes in human torso with myocardial defects in the left ventricular (LV) wall. Two phantoms were generated to simulate patients with thick and thin body builds. Projection data including the effects of attenuation, collimator-detector response and scatter were generated using SIMSET Monte Carlo simulations. A large number of photon histories were generated such that the projection data were close to noise free. Poisson noise fluctuations were then added to simulate the count densities found in clinical data. Noise-free and noisy projection data were reconstructed using the iterative OS-EM reconstruction algorithm with attenuation compensation. The reconstructed images from noisy projection data show that the noise levels are lower for the FB as compared to the PH collimator due to increase in detected counts. The NCO acquisition method provides slightly better resolution and small improvement in defect contrast as compared to the CO acquisition method in noise-free reconstructed images. Despite lower projection counts the NCO shows the same noise level as the CO in the attenuation corrected reconstruction images. The results from the channelized Hotelling observer (CHO) study show that FB collimator is superior to PH collimator in myocardial defect detection, but the NCO shows no statistical significant difference from the CO for either PH or FB collimator. In conclusion, our results indicate that data acquisition using NCO makes a very small improvement in the resolution over CO for myocardial SPECT imaging. This small improvement does not make a significant difference on myocardial defect detection. However, an FB collimator provides better defect detection than a PH collimator with similar spatial resolution for myocardial SPECT imaging.

  13. Development of a naming convention and data ma nagement system

    NASA Technical Reports Server (NTRS)

    Mcnider, Richard T.; Botts, Michael; Moss, Don; Conover, Helen; Criswell, Evan; Graves, Sara; Hardin, Danny

    1993-01-01

    This contract covered work in data management, acquisition, and analysis for the Earth Science and Applications Division (ESAD) of the Space Science Laboratory of MSFC. Under this contract, a naming convention and data management system were developed for ESAD data sets, data visualization, and standard data format issues were investigated, and specific data analysis and management needs were addressed for several ESAD projects and data sets. In the following sections, details of the research performed over the duration of this contract are summarized.

  14. Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2005-04-21

    6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research...between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build all DD(X)s. Several Members...premature” a Navy proposal to hold a one-time, winner-take-all competition between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics

  15. Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2005-06-24

    6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research...competition between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build all DD(X)s. The...competition between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build all DD(X)s

  16. Navy DD(X), GC(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2005-08-18

    5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) David D. Acker Library and Knowledge...System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build all DD(X)s. The Emergency Supplemental Appropriations Act...take-all competition between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build

  17. Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2006-03-07

    PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service The...New Orleans and a third facility at Gulfport, MS, form Northrop Grumman’s Ship Systems ( NGSS ) division. The Navy has not procured any frigates since...the program, it had decided to award the contract for the next phase on a sole-source basis to Northrop Grumman’s Ship Systems ( NGSS ) division, which

  18. Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2005-01-25

    PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,The...the contract for the next phase on a sole-source basis to NGSS . The first DD(X) would be built by Northrop/Ingalls, while the second would be built...by GD/BIW. The Navy has also stated that “The ship construction contracts will be allocated equally between NGSS and BIW for the first six ships

  19. Tools and data acquisition of borehole geophysical logging for the Florida Power and Light Company Turkey Point Power Plant in support of a groundwater, surface-water, and ecological monitoring plan, Miami-Dade County, Florida

    USGS Publications Warehouse

    Wacker, Michael A.

    2010-01-01

    Borehole geophysical logs were obtained from selected exploratory coreholes in the vicinity of the Florida Power and Light Company Turkey Point Power Plant. The geophysical logging tools used and logging sequences performed during this project are summarized herein to include borehole logging methods, descriptions of the properties measured, types of data obtained, and calibration information.

  20. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1984-01-01

    This publication provides reports on work performed for the Office of Space Tracking and Data Systems (OSTDS). It reports on the activities of the deep space network (DSN) and the Ground Communications Facility (GCF). Topics discussed on the operation of the DSN include: (1) spacecraft-ground communications; (2) station control and system technology; and (3) capabilities for new projects for systems implementation. The GCF compatibility with packets and data compression is discussed. In geodynamics, the publication reports on the application of radio interferometry at microwave frequencies for geodynamic measurements.

  1. Acquisition forecast: Fiscal year 1995

    NASA Technical Reports Server (NTRS)

    1995-01-01

    This volume includes projections of all anticipated FY95, and beyond, NASA contract actions above $25,000 that small and small disadvantaged businesses may be able to perform under direct contract with the government or as subcontractors. The forecast consolidates anticipated procurements at each NASA center into an agencywide report, with the aim of increasing industries' advance knowledge of NASA requirements and enhancing competition in contracting. Each center forecast report is divided into three principal categories of procurement: research and development, services, and supplies and equipment.

  2. Reinforced Concrete Beams under Combined Axial and Lateral Loading.

    DTIC Science & Technology

    1982-01-01

    NUMBER(s) Golden E. Lane, Jr. F29601-76-C-015 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT . PROJECT, TASK AREA 4 WORK UNIT NUMBERS New...acquisition system. The voltage output from the system’s digital multimeter was recorded on a floppy disk. The sampling rate was approximately two... samples per second for every channel. The same system was used to reduce and plot the data. TEST APPARATUS Figure 9 shows a schematic drawing of the load

  3. RPMA (Real Property Maintenance Activities) Consolidation Activities in the National Capital Region. Volume 1. Main Report.

    DTIC Science & Technology

    1984-05-01

    61[- ~%.- ~ * ’.. e. ,* .C . . -. . %~*, S . ** P~~ "’K . 5, FOREWORD This investigation was performed as a reimbursable project for the Hunts...Installation Overhead Rates to EA,CA Reimbursable Rates 102 **53 Comparison of Shop Costs 104 54 Cost of Equipment Acquisition (Replacement Value and Annual...B3 Task "C"--Develop the Detailed Financial Management Plan To Include Establishment of a Revolving Fund for Reimbursement 143 Z B4 Task "D"--Develop

  4. Landsat Program

    NASA Technical Reports Server (NTRS)

    Markham, Brian L.; Arvidson, Terry; Barsi, Julia A.; Choate, Michael; Kaita, Edward; Levy, Raviv; Lubke, Mark; Masek, Jeffrey G.

    2016-01-01

    Landsat initiated the revolution in moderate resolution Earth remote sensing in the 1970s. With seven successful missions over 40+ years, Landsat has documented - and continues to document - the global Earth land surface and its evolution. The Landsat missions and sensors have evolved along with the technology from a demonstration project in the analog world of visual interpretation to an operational mission in the digital world, with incremental improvements along the way in terms of spectral, spatial, radiometric and geometric performance as well as acquisition strategy, data availability, and products.

  5. XQ-NLM: Denoising Diffusion MRI Data via x-q Space Non-Local Patch Matching.

    PubMed

    Chen, Geng; Wu, Yafeng; Shen, Dinggang; Yap, Pew-Thian

    2016-10-01

    Noise is a major issue influencing quantitative analysis in diffusion MRI. The effects of noise can be reduced by repeated acquisitions, but this leads to long acquisition times that can be unrealistic in clinical settings. For this reason, post-acquisition denoising methods have been widely used to improve SNR. Among existing methods, non-local means (NLM) has been shown to produce good image quality with edge preservation. However, currently the application of NLM to diffusion MRI has been mostly focused on the spatial space (i.e., the x -space), despite the fact that diffusion data live in a combined space consisting of the x -space and the q -space (i.e., the space of wavevectors). In this paper, we propose to extend NLM to both x -space and q -space. We show how patch-matching, as required in NLM, can be performed concurrently in x-q space with the help of azimuthal equidistant projection and rotation invariant features. Extensive experiments on both synthetic and real data confirm that the proposed x-q space NLM (XQ-NLM) outperforms the classic NLM.

  6. Joint Strike Figher Acquisition: Mature Critical Technologies Needed to Reduce Risks

    DTIC Science & Technology

    2001-10-01

    Reduce Risks GAO-02-39 Report Documentation Page Report Date 00OCT2001 Report Type N/A Dates Covered (from... to) - Title and Subtitle JOINT STRIKE...FIGHTER ACQUISITION: Mature Critical Technologies Needed to Reduce Risks Contract Number Grant Number Program Element Number Author(s) Project...1Joint Strike Fighter Acquisition: Development Schedule Should Be Changed to Reduce Risks (GAO/T-NSIAD-00-132

  7. 3D Data Acquisition Platform for Human Activity Understanding

    DTIC Science & Technology

    2016-03-02

    3D data. The support for the acquisition of such research instrumentation have significantly facilitated our current and future research and educate ...SECURITY CLASSIFICATION OF: In this project, we incorporated motion capture devices, 3D vision sensors, and EMG sensors to cross validate...multimodality data acquisition, and address fundamental research problems of representation and invariant description of 3D data, human motion modeling and

  8. Integrating respiratory gating into a megavoltage cone-beam CT system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chang Jenghwa; Sillanpaa, Jussi; Ling, Clifton C.

    2006-07-15

    We have previously described a low-dose megavoltage cone beam computed tomography (MV CBCT) system capable of producing projection image using one beam pulse. In this study, we report on its integration with respiratory gating for gated radiotherapy. The respiratory gating system tracks a reflective marker on the patient's abdomen midway between the xiphoid and umbilicus, and disables radiation delivery when the marker position is outside predefined thresholds. We investigate two strategies for acquiring gated scans. In the continuous rotation-gated acquisition, the linear accelerator (LINAC) is set to the fixed x-ray mode and the gantry makes a 5 min, 360 deg.continuousmore » rotation, during which the gating system turns the radiation beam on and off, resulting in projection images with an uneven distribution of projection angles (e.g., in 70 arcs each covering 2 deg.). In the gated rotation-continuous acquisition, the LINAC is set to the dynamic arc mode, which suspends the gantry rotation when the gating system inhibits the beam, leading to a slightly longer (6-7 min) scan time, but yielding projection images with more evenly distributed projection angles (e.g., {approx}0.8 deg.between two consecutive projection angles). We have tested both data acquisition schemes on stationary (a contrast detail and a thoracic) phantoms and protocol lung patients. For stationary phantoms, a separate motion phantom not visible in the images is used to trigger the RPM system. Frame rate is adjusted so that approximately 450 images (13 MU) are acquired for each scan and three-dimensional tomographic images reconstructed using a Feldkamp filtered backprojection algorithm. The gated rotation-continuous acquisition yield reconstructions free of breathing artifacts. The tumor in parenchymal lung and normal tissues are easily discernible and the boundary between the diaphragm and the lung sharply defined. Contrast-to-noise ratio (CNR) is not degraded relative to nongated scans of stationary phantoms. The continuous rotation-gated acquisition scan also yields tomographic images with discernible anatomic features; however, streak artifacts are observed and CNR is reduced by approximately a factor of 4. In conclusion, we have successfully developed a gated MV CBCT system to verify the patient positioning for gated radiotherapy.« less

  9. The Earth Microbiome Project: Meeting report of the "1 EMP meeting on sample selection and acquisition" at Argonne National Laboratory October 6 2010.

    PubMed

    Gilbert, Jack A; Meyer, Folker; Jansson, Janet; Gordon, Jeff; Pace, Norman; Tiedje, James; Ley, Ruth; Fierer, Noah; Field, Dawn; Kyrpides, Nikos; Glöckner, Frank-Oliver; Klenk, Hans-Peter; Wommack, K Eric; Glass, Elizabeth; Docherty, Kathryn; Gallery, Rachel; Stevens, Rick; Knight, Rob

    2010-12-25

    This report details the outcome the first meeting of the Earth Microbiome Project to discuss sample selection and acquisition. The meeting, held at the Argonne National Laboratory on Wednesday October 6(th) 2010, focused on discussion of how to prioritize environmental samples for sequencing and metagenomic analysis as part of the global effort of the EMP to systematically determine the functional and phylogenetic diversity of microbial communities across the world.

  10. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1989-01-01

    Archival reports on developments in programs managed by the Jet Propulsion Laboratory's Office of Telecommunications and Data Acquisition are provided. Space communications, radio navigation, radio science, and ground based radio and radio astronomy are discussed. Deep Space Network projects are also discussed.

  11. 77 FR 44066 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-60; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... the United States Defense Advanced Research Projects Agency (DARPA) to the list of agencies that have entered into an agreement with the State of New Mexico. The agreement eliminates the double taxation of...

  12. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1985-01-01

    Developments in programs managed by the Jet Propulsion Laboratory's Office of Telecommunications and Data acquisition are discussed. Space communications, radio antennas, the Deep Space Network, antenna design, Project SETI, seismology, coding, very large scale integration, downlinking, and demodulation are among the topics covered.

  13. 23 CFR 710.313 - Design-build projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Design-build projects. 710.313 Section 710.313 Highways... REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build...-way acquisition and clearance services may be incorporated into the design-build contract if allowed...

  14. 23 CFR 710.313 - Design-build projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Design-build projects. 710.313 Section 710.313 Highways... REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build...-way acquisition and clearance services may be incorporated into the design-build contract if allowed...

  15. 23 CFR 710.313 - Design-build projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Design-build projects. 710.313 Section 710.313 Highways... REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build...-way acquisition and clearance services may be incorporated into the design-build contract if allowed...

  16. 48 CFR 22.404-5 - Expiration of project wage determinations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Expiration of project wage... Involving Construction 22.404-5 Expiration of project wage determinations. (a) The contracting officer shall make every effort to ensure that contract award is made before expiration of the project wage...

  17. 24 CFR 241.1005 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Insurance for Equity Loans and Acquisition Loans... qualified purchaser of an eligible low income housing project, which owner receives and becomes primarily... organization or a limited equity cooperative, which entity is purchasing an eligible low income housing project...

  18. The EURITRACK project: development of a tagged neutron inspection system for cargo containers

    NASA Astrophysics Data System (ADS)

    Perot, Bertrand; Perret, Gregory; Mariani, Alain; Ma, Jean-Luc; Szabo, Jean-Louis; Mercier, Emmanuel; Sannie, Guillaume; Viesti, Giuseppe; Nebbia, Giancarlo; Pesente, Silvia; Lunardon, Marcello; Formisano, Paola; Moretto, Sandra; Fabris, Daniela; Zenoni, Aldo; Bonomi, Germano; Donzella, Antonietta; Fontana, Andrea; Boghen, Gaia; Valkovic, Vladivoj; Sudac, Darovin; Moszynski, Marek; Batsch, Tadeusz; Gierlik, Michal; Wolski, Dariusz; Klamra, Wlodzimierz; Isaksson, Patrick; Le Tourneur, Philippe; Lhuissier, Miguel; Colonna, Annamaria; Tintori, Carlo; Peerani, Paolo; Sequeira, Vitor; Salvato, Martino

    2006-05-01

    The EURopean Illicit TRAfficing Countermeasures Kit project is part of the 6th European Union Framework Program, and aims at developing a neutron inspection system for detecting threat materials (explosives, drugs, etc.) in cargo containers. Neutron interaction in the container produces specific gamma-rays used to determine the chemical composition of the inspected material. An associated particle sealed tube neutron generator is developed to allow precise location of the interaction point by direction and time-of-flight measurements of the neutrons tagged by alpha-particles. The EURITRACK project consists in developing: a transportable deuterium-tritium neutron generator including a position sensitive alpha detector (8×8 matrix of YAP:Ce crystals coupled to a multi-anode photomultiplier), fast neutron and gamma-ray detectors, front-end electronics to perform coincidence and spectroscopic measurements, and an integrated software which manages neutron generator and detectors positioning, data acquisition and analysis. Hardware components have been developed and tested by the consortium partners. Current status of this work and provisional performances of the system assessed by Monte Carlo calculations are presented.

  19. Libby/Hungry Horse Dams Wildlife Mitigation : Montana Wildlife Habitat Protection : Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, Marilyn

    1992-12-01

    The purpose of this project was to develop and obtain information necessary to evaluate and undertake specific wildlife habitat protection/enhancement actions in northwest Montana as outlined in the Columbia River Basin Fish and Wildlife Program. Three waterfowl projects were evaluated between September 1989 and June 1990. Weaver's Slough project involved the proposed acquisition of 200 acres of irrigated farmland and a donated conservation easement on an additional 213 acres. The proposal included enhancement of the agricultural lands by conversion to upland nesting cover. This project was rated the lowest priority based on limited potential for enhancement and no further actionmore » was pursued. The Crow Creek Ranch project involved the proposed acquisition of approximately 1830 acres of grazing and dryland farming lands. The intent would be to restore drained potholes and provide adjacent upland nesting cover to increase waterfowl production. This project received the highest rating based on the immediate threat of subdivision, the opportunity to restore degraded wetlands, and the overall benefits to numerous species besides waterfowl. Ducks Unlimited was not able to participate as a cooperator on this project due to the jurisdiction concerns between State and tribal ownership. The USFWS ultimately acquired 1,550 acres of this proposed project. No mitigation funds were used. The Ashley Creek project involved acquisition of 870 acres adjacent to the Smith Lake Waterfowl Production Area. The primary goal was to create approximately 470 acres of wetland habitat with dikes and subimpoundments. This project was rated second in priority due to the lesser threat of loss. A feasibility analysis was completed by Ducks Unlimited based on a concept design. Although adequate water was available for the project, soil testing indicated that the organic soils adjacent to the creek would not support the necessary dikes. The project was determined not feasible for mitigation implementation. Although no waterfowl/wetland projects were implemented using mitigation funds, 1,550 acres were protected based on work done under this project.« less

  20. Spectral Dynamics Inc., ships hybrid, 316-channel data acquisition system to Sandia Labs.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwartz, Douglas

    2003-09-01

    Spectral Dynamics announced the shipment of a 316-channel data acquisition system. The system was custom designed for the Light Initiated High Explosive (LIHE) facility at Sandia Labs in Albuquerque, New Mexico by Spectral Dynamics Advanced Research Products Group. This Spectral Dynamics data acquisition system was tailored to meet the unique LIHE environmental and testing requirements utilizing Spectral Dynamics commercial off the shelf (COTS) Jaguar and VIDAS products supplemented by SD Alliance partner's (COTS) products. 'This system is just the beginning of our cutting edge merged technology solutions,' stated Mark Remelman, Manager for the Spectral Dynamics Advanced Research Products Group. 'Thismore » Hybrid system has 316-channels of data acquisition capability, comprised of 102.4kHz direct to disk acquisition and 2.5MHz, 200Mhz & 500Mhz RAM based capabilities. In addition it incorporates the advanced bridge conditioning and dynamic configuration capabilities offered by Spectral Dynamics new Smart Interface Panel System (SIPS{trademark}).' After acceptance testing, Tony King, the Instrumentation Engineer facilitating the project for the Sandia LIHE group commented; 'The LIHE staff was very impressed with the design, construction, attention to detail and overall performance of the instrumentation system'. This system combines VIDAS, a leading edge fourth generation SD-VXI hardware and field-proven software system from SD's Advanced Research Products Group with SD's Jaguar, a multiple Acquisition Control Peripheral (ACP) system that allows expansion to hundreds of channels without sacrificing signal processing performance. Jaguar incorporates dedicated throughput disks for each ACP providing time streaming to disk at up to the maximum sample rate. Spectral Dynamics, Inc. is a leading worldwide supplier of systems and software for advanced computer-automated data acquisition, vibration testing, structural dynamics, explosive shock, high-speed transient capture, acoustic analysis, monitoring, measurement, control and backup. Spectral Dynamics products are used for research, design verification, product testing and process improvement by manufacturers of all types of electrical, electronic and mechanical products, as well as by universities and government-funded agencies. The Advanced Research Products Group is the newest addition to the Spectral Dynamics family. Their newest VXI data acquisition hardware pushes the envelope on capabilities and embodies the same rock solid design methodologies, which have always differentiated Spectral Dynamics from its competition.« less

  1. The control and data acquisition structure for the GAMMA-400 space gamma-telescope

    NASA Astrophysics Data System (ADS)

    Arkhangelskiy, Andrey

    2016-07-01

    The GAMMA-400 space project is intended for precision investigation of the cosmic gamma-emission in the energy band from keV region up to several TeV, electrons and positrons fluxes from ˜~1~GeV up to ˜~10~TeV and high energy cosmic-ray nuclei fluxes. A description of the control and data acquisition structure for gamma-telescope involved in the GAMMA 400 space project is given. The technical capabilities of all specialized equipment providing the functioning of the scientific instrumentation and satellite support systems are unified in a single structure. Control of the scientific instruments is maintained using one-time pulse radio commands and program commands transmitted via onboard control system and scientific data acquisition system. Up to 100~GByte of data per day can be transferred to the ground segment of the project. The correctness of the proposed and implemented structure, engineering solutions and electronic elemental base selection has been verified experimentally with the scientific complex prototype in the laboratory conditions.

  2. Acquisition and Processing Protocols for Uav Images: 3d Modeling of Historical Buildings Using Photogrammetry

    NASA Astrophysics Data System (ADS)

    Murtiyoso, A.; Koehl, M.; Grussenmeyer, P.; Freville, T.

    2017-08-01

    Photogrammetry has seen an increase in the use of UAVs (Unmanned Aerial Vehicles) for both large and smaller scale cartography. The use of UAVs is also advantageous because it may be used for tasks requiring quick response, including in the case of the inspection and monitoring of buildings. The objective of the project is to study the acquisition and processing protocols which exist in the literature and to adapt them for UAV projects. This implies a study on the calibration of the sensors, flight planning, comparison of software solutions, data management, and analysis on the different products of a UAV project. Two historical buildings of the city of Strasbourg were used as case studies: a part of the Rohan Palace façade and the St-Pierre-le-Jeune Catholic church. In addition, a preliminary test was performed on the Josephine Pavilion. Two UAVs were used in this research; namely the Sensefly Albris and the DJI Phantom 3 Professional. The experiments have shown that the calibration parameters tend to be unstable for small sensors. Furthermore, the dense matching of images remains a particular problem to address in a close range photogrammetry project, more so in the presence of noise on the images. Data management in cases where the number of images is high is also very important. The UAV is nevertheless a suitable solution for the surveying and recording of historical buildings because it is able to take images from points of view which are normally inaccessible to classical terrestrial techniques.

  3. 48 CFR 339.101 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... computers, mobile devices, or portable media to store or process HHS sensitive information that the Project... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 339.101 Policy. (d)(1) The Contracting Officer shall... orders that involve the operation or acquisition of an information technology system (for definition of...

  4. Telecommunications and data acquisition

    NASA Technical Reports Server (NTRS)

    Renzetti, N. A. (Editor)

    1981-01-01

    Deep Space Network progress in flight project support, tracking and data acquisition research and technology, network engineering, hardware and software implementation, and operations is reported. In addition, developments in Earth based radio technology as applied to geodynamics, astrophysics, and the radio search for extraterrestrial intelligence are reported.

  5. 48 CFR 339.101 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... computers, mobile devices, or portable media to store or process HHS sensitive information that the Project... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 339.101 Policy. (d)(1) The Contracting Officer shall... orders that involve the operation or acquisition of an information technology system (for definition of...

  6. 48 CFR 339.101 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... computers, mobile devices, or portable media to store or process HHS sensitive information that the Project... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 339.101 Policy. (d)(1) The Contracting Officer shall... orders that involve the operation or acquisition of an information technology system (for definition of...

  7. 48 CFR 339.101 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... computers, mobile devices, or portable media to store or process HHS sensitive information that the Project... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 339.101 Policy. (d)(1) The Contracting Officer shall... orders that involve the operation or acquisition of an information technology system (for definition of...

  8. 48 CFR 324.103 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Procedures. 324.103 Section 324.103 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES SOCIOECONOMIC PROGRAMS... attached, the Contracting Officer shall inquire about its status and shall obtain a copy from the Project...

  9. 48 CFR 1609.7101-2 - Community-rated carrier performance factors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Community-rated carrier performance factors. 1609.7101-2 Section 1609.7101-2 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING...

  10. 48 CFR 1609.7101-2 - Community-rated carrier performance factors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Community-rated carrier performance factors. 1609.7101-2 Section 1609.7101-2 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING...

  11. 48 CFR 1609.7101-2 - Community-rated carrier performance factors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Community-rated carrier performance factors. 1609.7101-2 Section 1609.7101-2 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING...

  12. Circular tomosynthesis for neuro perfusion imaging on an interventional C-arm

    NASA Astrophysics Data System (ADS)

    Claus, Bernhard E.; Langan, David A.; Al Assad, Omar; Wang, Xin

    2015-03-01

    There is a clinical need to improve cerebral perfusion assessment during the treatment of ischemic stroke in the interventional suite. The clinician is able to determine whether the arterial blockage was successfully opened but is unable to sufficiently assess blood flow through the parenchyma. C-arm spin acquisitions can image the cerebral blood volume (CBV) but are challenged to capture the temporal dynamics of the iodinated contrast bolus, which is required to derive, e.g., cerebral blood flow (CBF) and mean transit time (MTT). Here we propose to utilize a circular tomosynthesis acquisition on the C-arm to achieve the necessary temporal sampling of the volume at the cost of incomplete data. We address the incomplete data problem by using tools from compressed sensing and incorporate temporal interpolation to improve our temporal resolution. A CT neuro perfusion data set is utilized for generating a dynamic (4D) volumetric model from which simulated tomo projections are generated. The 4D model is also used as a ground truth reference for performance evaluation. The performance that may be achieved with the tomo acquisition and 4D reconstruction (under simulation conditions, i.e., without considering data fidelity limitations due to imaging physics and imaging chain) is evaluated. In the considered scenario, good agreement between the ground truth and the tomo reconstruction in the parenchyma was achieved.

  13. Feasibility Studies for a Mediterranean Neutrino Observatory - The NEMO.RD Project

    NASA Astrophysics Data System (ADS)

    de Marzo, C.; Ambriola, M.; Bellotti, R.; Cafagna, F.; Calicchio, M.; Ciacio, F.; Circella, M.; de Marzo, C.; Montaruli, T.; Falchieri, D.; Gabrielli, A.; Gandolfi, E.; Masetti, M.; Vitullo, C.; Zanarini, G.; Habel, R.; Usai, I.; Aiello, S.; Burrafato, G.; Caponetto, L.; Costanzo, E.; Lopresti, D.; Pappalardo, L.; Petta, C.; Randazzo, N.; Russo, G. V.; Troia, O.; Barnà, R.; D'Amico, V.; de Domenico, E.; de Pasquale, D.; Giacobbe, S.; Italiano, A.; Migliardo, F.; Salvato, G.; Trafirò, A.; Trimarchi, M.; Ameli, F.; Bonori, M.; Bottai, S.; Capone, A.; Desiati, P.; Massa, F.; Masullo, R.; Salusti, E.; Vicini, M.; Coniglione, R.; Migneco, E.; Piattelli, P.; Riccobene, R.; Sapienza, P.; Cordelli, M.; Trasatti, L.; Valente, V.; de Marchis, G.; Piccari, L.; Accerboni, E.; Mosetti, R.; Astraldi, M.; Gasparini, G. P.; Ulzega, A.; Orrù, P.

    2000-06-01

    The NEMO.RD Project is a feasibility study of a km3 underwater telescope for high energy astrophysical neutrinos to be located in the Mediterranea Sea. At present this study concerns: i) Monte Carlo simulation study of the capabilities of various arrays of phototubes in order to determine the detector geometry that can optimize performance and cost; ii) design of low power consumption electronic cards for data acquisition and transmission to shore; iii) feasibility study of mechanics, deployment, connection and maintenance of such a detector in collaboration with petrol industries having experience of undersea operations; iv) oceanographic exploration of various sites in search for the optimal one. A brief report on the status of points i) and iv) is presented here

  14. Acquisition How to Guide: Planning, Preparing, and Processing Acquisition Packages

    DTIC Science & Technology

    1993-08-01

    of Task Outline. In very simple acquisitions, the project officer or COR, with the advice and counsel of the Contract Specialist, may...three concise sentences , each limited to a single idea. Use simple sentence structure (i.e., subject-verb-complement/object). The natural order of words... in a sentence tells the function of each word. Use a paragraph to state a single idea and elaborate on it. State the

  15. Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules

    DTIC Science & Technology

    2015-06-01

    additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of

  16. NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)

    EPA Science Inventory

    This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...

  17. Coast Guard : actions needed to mitigate deepwater project risks

    DOT National Transportation Integrated Search

    2001-05-03

    The Deepwater Capability Replacement Project was initiated by the Coast Guard to replace and modernize its aging fleet of over 90 cutters and 200 aircraft used beyond 50 miles from shore. This project, the largest acquisition ever attempted by the Co...

  18. Controls with remote sensing of Common Agricultural Policy (CAP) arable- and forage- area-based subsidies: a yearly more than 700-image and 3-M euro affair

    NASA Astrophysics Data System (ADS)

    Astrand, Par-Johan; Wirnhardt, Csaba; Biagini, Bruno; Weber, Michaela; Hellerman, Rani

    2004-11-01

    Since 1993, the EC DG Agriculture has promoted the use of "Controls with Remote Sensing" (CwRS) as appropriate control system within the Common Agricultural Policy (CAP). CwRS is considered suitable to check if agricultural area-based subsidies (yearly > 25 billion euro EC expenditure) are correctly granted. On the basis of the Council Regulation (EC) 165/94 and of the Commission Regulation (EC) 601/94, the Commission Services are required to centralize the satellite images acquisition. This task has been managed by the MARS Project at the JRC since 1999, where the whole controls activity is coordinated. The activity also includes the setting up of specifications, recommendations, performing Quality Controls (QC) and auditing of the selected contractors, and evaluation of new methods. Satellite image acquisition involves the control site definition within each Member State, and the subsequent chain of image acquisition over the defined sites including feasibility with image providers, acquisition, validation, ordering, delivery and final archiving of the imagery. In summary the 2004 years campaign involved a budget of approximately 3.2 M euro to cover some 150 High Resolution (HR) sites and 71 Very High Resolution (VHR) sites. The objective of this paper is to describe the CwRS image acquisition with emphasis on the Ikonos, Quickbird, and EROS A satellites for the 2004 years CwRS Campaign, to give preliminary results, recommendations and future trends.

  19. Spectrotemporal CT data acquisition and reconstruction at low dose

    PubMed Central

    Clark, Darin P.; Lee, Chang-Lung; Kirsch, David G.; Badea, Cristian T.

    2015-01-01

    Purpose: X-ray computed tomography (CT) is widely used, both clinically and preclinically, for fast, high-resolution anatomic imaging; however, compelling opportunities exist to expand its use in functional imaging applications. For instance, spectral information combined with nanoparticle contrast agents enables quantification of tissue perfusion levels, while temporal information details cardiac and respiratory dynamics. The authors propose and demonstrate a projection acquisition and reconstruction strategy for 5D CT (3D + dual energy + time) which recovers spectral and temporal information without substantially increasing radiation dose or sampling time relative to anatomic imaging protocols. Methods: The authors approach the 5D reconstruction problem within the framework of low-rank and sparse matrix decomposition. Unlike previous work on rank-sparsity constrained CT reconstruction, the authors establish an explicit rank-sparse signal model to describe the spectral and temporal dimensions. The spectral dimension is represented as a well-sampled time and energy averaged image plus regularly undersampled principal components describing the spectral contrast. The temporal dimension is represented as the same time and energy averaged reconstruction plus contiguous, spatially sparse, and irregularly sampled temporal contrast images. Using a nonlinear, image domain filtration approach, the authors refer to as rank-sparse kernel regression, the authors transfer image structure from the well-sampled time and energy averaged reconstruction to the spectral and temporal contrast images. This regularization strategy strictly constrains the reconstruction problem while approximately separating the temporal and spectral dimensions. Separability results in a highly compressed representation for the 5D data in which projections are shared between the temporal and spectral reconstruction subproblems, enabling substantial undersampling. The authors solved the 5D reconstruction problem using the split Bregman method and GPU-based implementations of backprojection, reprojection, and kernel regression. Using a preclinical mouse model, the authors apply the proposed algorithm to study myocardial injury following radiation treatment of breast cancer. Results: Quantitative 5D simulations are performed using the MOBY mouse phantom. Twenty data sets (ten cardiac phases, two energies) are reconstructed with 88 μm, isotropic voxels from 450 total projections acquired over a single 360° rotation. In vivo 5D myocardial injury data sets acquired in two mice injected with gold and iodine nanoparticles are also reconstructed with 20 data sets per mouse using the same acquisition parameters (dose: ∼60 mGy). For both the simulations and the in vivo data, the reconstruction quality is sufficient to perform material decomposition into gold and iodine maps to localize the extent of myocardial injury (gold accumulation) and to measure cardiac functional metrics (vascular iodine). Their 5D CT imaging protocol represents a 95% reduction in radiation dose per cardiac phase and energy and a 40-fold decrease in projection sampling time relative to their standard imaging protocol. Conclusions: Their 5D CT data acquisition and reconstruction protocol efficiently exploits the rank-sparse nature of spectral and temporal CT data to provide high-fidelity reconstruction results without increased radiation dose or sampling time. PMID:26520724

  20. Teaching a Systems Approach: An Innovative Quality Improvement Project.

    PubMed

    Hamrin, Vanya; Vick, Rose; Brame, Cynthia; Simmons, Megan; Smith, Letizia; Vanderhoef, Dawn

    2016-04-01

    Nurse practitioners are required to navigate complex health care systems. Quality improvement (QI) projects provide the opportunity for nurse practitioner students to learn systems knowledge and improve health care outcomes in patient populations. A gap in the literature exists around how to systematically teach, apply, and measure QI curricular objectives at the master's level. Six faculty evaluated the QI project for the psychiatric nurse practitioner master's program by identifying the most challenging QI concepts for students to apply, revising their teaching strategies to address gaps, and retrospectively evaluating the outcomes of these curriculum changes by comparing student outcomes before and after the curricular changes. A significant difference was noted on QI project performance between students in the 2014 and 2015 graduating classes, measured by the scores earned on students' final papers (t[92] = 1.66, p = .05, d = .34, r(2) = .0289). Theoretical principles of adult and cooperative learning were used to inform curricular changes to enhance student's acquisition of QI skills. Copyright 2016, SLACK Incorporated.

  1. Simultaneous deblending and interpolation using structure-oriented filters

    NASA Astrophysics Data System (ADS)

    Zhou, Yatong; Li, Song

    2018-03-01

    Simultaneous source shooting is a modern marine acquisition technology that accelerates field acquisition tremendously. However, we need to carefully remove the spike-like noise in the recorded seismic data, the process of which is called deblending. Considering the field obstacles, the recorded data may also contain missing traces. In this paper, we propose a very efficient way to simultaneously remove the spike-like noise to separate simultaneous sources and fill the data gaps in the recorded data. We propose to apply structure-oriented median and mean filters to reject the spike-like noise and restore the missing data. The commonly used median and mean filters guarantee the efficiency and convenience of the proposed algorithm framework. We use a robust slope estimation method to calculate the local slope of the structure patterns in the seismic data. Both synthetic and field data examples demonstrate the successful performance of the proposed algorithm. When compared with the state-of-the-art FK transform based projection onto convex sets (POCS) method, the presented method can obtain better performance with much less computational cost.

  2. Development of the Cassini Ground Data System in a multimission environment

    NASA Technical Reports Server (NTRS)

    Madrid, G.; Wanczuk, G.

    1993-01-01

    As baselined, the Cassini Ground Data System (GDS) will be composed of Project specific and multimission elements. The former will be developed by the Cassini Project and the latter by two JPL institutional organizations, the Telecommunications and Data Acquisition Office (TDA) and the Multimission Operations Systems Office (MOSO). The GDS will be developed in three principal phases: Spacecraft Test, Launch-cruise, and Science Tour, with a significant part of the development deferred until the post-launch period. New capabilities are being introduced that are key to the achievement of more cost effective operations. Successful development of the system will require careful planning and will involve participation of diverse disciplines. This paper introduces the Cassini Project from the Ground Data System perspective and discusses development approaches expected to produce systems which meet functional and performance requirements and which will be delivered on schedule and within budget.

  3. The European computer model for optronic system performance prediction (ECOMOS)

    NASA Astrophysics Data System (ADS)

    Repasi, Endre; Bijl, Piet; Labarre, Luc; Wittenstein, Wolfgang; Bürsing, Helge

    2017-05-01

    ECOMOS is a multinational effort within the framework of an EDA Project Arrangement. Its aim is to provide a generally accepted and harmonized European computer model for computing nominal Target Acquisition (TA) ranges of optronic imagers operating in the Visible or thermal Infrared (IR). The project involves close co-operation of defence and security industry and public research institutes from France, Germany, Italy, The Netherlands and Sweden. ECOMOS uses and combines well-accepted existing European tools to build up a strong competitive position. This includes two TA models: the analytical TRM4 model and the image-based TOD model. In addition, it uses the atmosphere model MATISSE. In this paper, the central idea of ECOMOS is exposed. The overall software structure and the underlying models are shown and elucidated. The status of the project development is given as well as a short outlook on validation tests and the future potential of simulation for sensor assessment.

  4. Acquisition of Skill Proficiency Over Multiple Sessions of a Novel Rover Simulation

    NASA Technical Reports Server (NTRS)

    Dean, S. L.; DeDios,Y. E.; MacDougall, H. G.; Moore, S. T.; Wood, S. J.

    2011-01-01

    Following long-duration exploration transits, adaptive changes in sensorimotor function may impair the crew's ability to safely perform manual control tasks such as operating pressurized rovers. Postflight performance will also be influenced by the level of preflight skill proficiency they have attained. The purpose of this study was to characterize the acquisition of skills in a motion-based rover simulation over multiple sessions, and to investigate the effects of varying the simulation scenarios. METHODS: Twenty healthy subjects were tested in 5 sessions, with 1-3 days between sessions. Each session consisted of a serial presentation of 8 discrete tasks to be completed as quickly and accurately as possible. Each task consisted of 1) perspective-taking, using a map that defined a docking target, 2) navigation toward the target around a Martian outpost, and 3) docking a side hatch of the rover to a visually guided target. The simulator utilized a Stewart-type motion base (CKAS, Australia), single-seat cabin with triple scene projection covering 150 deg horizontal by 50 deg vertical, and joystick controller. Subjects were randomly assigned to a control group (tasks identical in the first 4 sessions) or a varied-practice group. The dependent variables for each task included accuracy toward the target and time to completion. RESULTS: The greatest improvements in time to completion occurred during the docking phase. The varied-practice group showed more improvement in perspective-taking accuracy. Perspective-taking accuracy was also affected by the relative orientation of the rover to the docking target. Skill acquisition was correlated with self-ratings of previous gaming experience. DISCUSSION: Varying task selection and difficulty will optimize the preflight acquisition of skills when performing novel operational tasks. Simulation of operational manual control will provide functionally relevant evidence regarding the impact of sensorimotor adaptation on early surface operations and what countermeasures are needed. Learning Objective: The use of a motion-based simulation to investigate decrements in the proficiency to operate pressurized rovers during early surface operations of space exploration missions, along with the acquisition of skill proficiency needed during the preflight phase of the mission.

  5. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  6. 42 CFR 51c.504 - Project elements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Project elements. 51c.504 Section 51c.504 Public... SERVICES Acquisition and Modernization of Existing Buildings § 51c.504 Project elements. (a) General requirements. A grantee which has received a grant under section 330 of the Act for a project which includes...

  7. 76 FR 6820 - Contract for Hydroelectric Power Development at the C-Drop, a Feature of the Klamath Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... Acquisition and Easements, Hydraulics and Hydrology, Water Rights, Project Features and Design, Power... Federal water resource projects, Reclamation will consider proposals for non-Federal development of... part of the Klamath Project, the United States constructed A, B, and C-Canals, which carry water south...

  8. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... appropriate conveyance. Project-related planning costs outlined in § 64.9(a)(3), may be incurred prior to...) Construction costs associated with developing the right-of-way for recreation use. (3) Project-related planning required for the acquisition, development and use of the abandoned rights-of-way including master planning...

  9. 42 CFR 51c.504 - Project elements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Project elements. 51c.504 Section 51c.504 Public... SERVICES Acquisition and Modernization of Existing Buildings § 51c.504 Project elements. (a) General requirements. A grantee which has received a grant under section 330 of the Act for a project which includes...

  10. 42 CFR 51c.504 - Project elements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Project elements. 51c.504 Section 51c.504 Public... SERVICES Acquisition and Modernization of Existing Buildings § 51c.504 Project elements. (a) General requirements. A grantee which has received a grant under section 330 of the Act for a project which includes...

  11. 42 CFR 51c.504 - Project elements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Project elements. 51c.504 Section 51c.504 Public... SERVICES Acquisition and Modernization of Existing Buildings § 51c.504 Project elements. (a) General requirements. A grantee which has received a grant under section 330 of the Act for a project which includes...

  12. 42 CFR 51c.504 - Project elements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Project elements. 51c.504 Section 51c.504 Public... SERVICES Acquisition and Modernization of Existing Buildings § 51c.504 Project elements. (a) General requirements. A grantee which has received a grant under section 330 of the Act for a project which includes...

  13. The telecommunications and data acquisition report

    NASA Technical Reports Server (NTRS)

    Renzetti, N. A.

    1980-01-01

    Deep Space Network progress in flight project support, tracking and data acquisition research and technology, network engineering, hardware and software implemention, and operations is documented. In addition, developments in Earth based radio technology as applied to geodynamics, astrophysics, and the radio search for extraterrestrial intelligence are reported.

  14. NASA Data Acquisitions System (NDAS) Software Architecture

    NASA Technical Reports Server (NTRS)

    Davis, Dawn; Duncan, Michael; Franzl, Richard; Holladay, Wendy; Marshall, Peggi; Morris, Jon; Turowski, Mark

    2012-01-01

    The NDAS Software Project is for the development of common low speed data acquisition system software to support NASA's rocket propulsion testing facilities at John C. Stennis Space Center (SSC), White Sands Test Facility (WSTF), Plum Brook Station (PBS), and Marshall Space Flight Center (MSFC).

  15. 24 CFR 941.207 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Displacement, relocation, and... Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and... displacement of persons (households, businesses, nonprofit organizations, and farms) as a result of a project...

  16. 24 CFR 941.207 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Displacement, relocation, and... Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and... displacement of persons (households, businesses, nonprofit organizations, and farms) as a result of a project...

  17. 24 CFR 941.207 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Displacement, relocation, and... Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and... displacement of persons (households, businesses, nonprofit organizations, and farms) as a result of a project...

  18. 24 CFR 941.207 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Displacement, relocation, and... Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and... displacement of persons (households, businesses, nonprofit organizations, and farms) as a result of a project...

  19. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1986-01-01

    Deep Space Network progress in flight project support, tracking and data acquisition research and technology, network engineering, hardware and software implementation, and operations is documented. In addition, developments in Earth-based radio technology as applied to geodynamics, astrophysics and the radio search for extraterrestrial intelligence are reported.

  20. 75 FR 7303 - Drake Cement, LLC-Acquisition Exemption-Clarkdale Arizona Central Railroad, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-18

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [STB Finance Docket No. 35350] Drake Cement, LLC--Acquisition Exemption--Clarkdale Arizona Central Railroad, LLC Drake Cement, LLC (DC), a..., Drake Switching Company, LLC --Operation Exemption-- Drake Cement, LLC. DC certifies that the projected...

  1. 48 CFR 301.606-73 - Requirements for continuous learning maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Requirements for continuous learning maintenance. 301.606-73 Section 301.606-73 Federal Acquisition Regulations System HEALTH..., and Responsibilities 301.606-73 Requirements for continuous learning maintenance. Designated Project...

  2. System Design Description for the SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control System (DACS-1)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ERMI, A.M.

    2000-01-24

    This document describes the hardware and software of the computer subsystems for the Data Acquisition and Control System (DACS) used in mitigation tests conducted on waste tank 241-SY-101 at the Hanford Nuclear Reservation.

  3. 2 CFR 215.23 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... the acquisition of equipment, buildings or land, the total value of the donated property may be...

  4. 48 CFR 301.606-73 - Requirements for continuous learning maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Requirements for continuous learning maintenance. 301.606-73 Section 301.606-73 Federal Acquisition Regulations System HEALTH..., and Responsibilities 301.606-73 Requirements for continuous learning maintenance. Designated Project...

  5. Development and testing of a CW-EPR apparatus for imaging of short-lifetime nitroxyl radicals in mouse head

    NASA Astrophysics Data System (ADS)

    Sato-Akaba, Hideo; Fujii, Hirotada; Hirata, Hiroshi

    2008-08-01

    This article describes a method for reducing the acquisition time in three-dimensional (3D) continuous-wave electron paramagnetic resonance (CW-EPR) imaging. To visualize nitroxyl spin probes, which have a short lifetime in living organisms, the acquisition time for a data set of spectral projections should be shorter than the lifetime of the spin probes. To decrease the total time required for data acquisition, the duration of magnetic field scanning was reduced to 0.5 s. Moreover, the number of projections was decreased by using the concept of a uniform distribution. To demonstrate this faster data acquisition, two kinds of nitroxyl radicals with different decay rates were measured in mice. 3D EPR imaging of 4-hydroxy-2,2,6,6-tetramethylpiperidine-d 17-1- 15N-1-oxyl in mouse head was successfully carried out. 3D EPR imaging of nitroxyl spin probes with a half-life of a few minutes was achieved for the first time in live animals.

  6. Comparative power law analysis of structured breast phantom and patient images in digital mammography and breast tomosynthesis.

    PubMed

    Cockmartin, L; Bosmans, H; Marshall, N W

    2013-08-01

    This work characterizes three candidate mammography phantoms with structured background in terms of power law analysis in the low frequency region of the power spectrum for 2D (planar) mammography and digital breast tomosynthesis (DBT). The study was performed using three phantoms (spheres in water, Voxmam, and BR3D CIRS phantoms) on two DBT systems from two different vendors (Siemens Inspiration and Hologic Selenia Dimensions). Power spectra (PS) were calculated for planar projection, DBT projection, and reconstructed images and curve fitted in the low frequency region from 0.2 to 0.7 mm(-1) with a power law function characterized by an exponent β and magnitude κ. The influence of acquisition dose and tube voltage on the power law parameters was first explored. Then power law parameters were calculated from images acquired with the same anode∕filter combination and tube voltage for the three test objects, and compared with each other. Finally, PS curves for automatic exposure controlled acquisitions (anode∕filter combination and tube voltages selected by the systems based on the breast equivalent thickness of the test objects) were compared against PS analysis performed on patient data (for Siemens 80 and for Hologic 48 mammograms and DBT series). Dosimetric aspects of the three test objects were also examined. The power law exponent (β) was found to be independent of acquisition dose for planar mammography but varied more for DBT projections of the sphere-phantom. Systematic increase of tube voltage did not affect β but decreased κ, both in planar and DBT projection phantom images. Power spectra of the BR3D phantom were closer to those of the patients than these of the Voxmam phantom; the Voxmam phantom gave high values of κ compared to the other phantoms and the patient series. The magnitude of the PS curves of the BR3D phantom was within the patient range but β was lower than the average patient value. Finally, PS magnitude for the sphere-phantom coincided with the patient curves for Siemens but was lower for the Hologic system. Close agreement of doses for all three phantoms with patient doses was found. Power law parameters of the phantoms were close to those of the patients but no single phantom matched in terms of both magnitude (κ) and texture (β) for the x-ray systems in this work. PS analysis of structured phantoms is feasible and this methodology can be used to suggest improvements in phantom design.

  7. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...; (e) A change order procedure which includes a documented, systematic approach to the handling of... covering the project management organization, appropriate consultants, property acquisition, utility... 49 Transportation 7 2011-10-01 2011-10-01 false Contents of a project management plan. 633.25...

  8. 49 CFR 256.7 - Financial assistance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... passenger terminal, under subsection 4(i)(2) of the Act, may be expended for the following project costs incurred after the date of final project approval: (1) Acquisition or long-term lease of real property or... project implementation; (2) Final architectural and engineering construction documentation, including all...

  9. 48 CFR 16.402-2 - Performance incentives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance incentives. 16.402-2 Section 16.402-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... appropriate in major systems contracts, both in development (when performance objectives are known and the...

  10. 24 CFR 241.1068 - Renegotiation of an equity loan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AUTHORITIES SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Insurance for Equity Loans and Acquisition... the project for which a loan closing occurred if— (a) The loan closing occurred between September 28...

  11. Case studies for observation planning algorithm of a Japanese spaceborne sensor: Hyperspectral Imager Suite (HISUI)

    NASA Astrophysics Data System (ADS)

    Ogawa, Kenta; Konno, Yukiko; Yamamoto, Satoru; Matsunaga, Tsuneo; Tachikawa, Tetsushi; Komoda, Mako; Kashimura, Osamu; Rokugawa, Shuichi

    2016-10-01

    Hyperspectral Imager Suite (HISUI)[1] is a Japanese future spaceborne hyperspectral instrument being developed by Ministry of Economy, Trade, and Industry (METI) and will be delivered to ISS in 2018. In HISUI project, observation strategy is important especially for hyperspectral sensor, and relationship between the limitations of sensor operation and the planned observation scenarios have to be studied. We have developed concept of multiple algorithms approach. The concept is to use two (or more) algorithm models (Long Strip Model and Score Downfall Model) for selecting observing scenes from complex data acquisition requests with satisfactory of sensor constrains. We have tested the algorithm, and found that the performance of two models depends on remaining data acquisition requests, i.e. distribution score along with orbits. We conclude that the multiple algorithms approach will be make better collection plans for HISUI comparing with single fixed approach.

  12. 48 CFR 7.102 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Policy. 7.102 Section 7.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.102 Policy. (a) Agencies shall perform acquisition planning and...

  13. 48 CFR 7.102 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 7.102 Section 7.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.102 Policy. (a) Agencies shall perform acquisition planning and...

  14. Evolution Of The Operational Energy Strategy And Its Consideration In The Defense Acquisition Process

    DTIC Science & Technology

    2016-09-01

    OPERATIONAL ENERGY STRATEGY AND ITS CONSIDERATION IN THE DEFENSE ACQUISITION PROCESS by Richard J. Kendig Ashley D. Seaton Robert J. Rodgers...project 4. TITLE AND SUBTITLE EVOLUTION OF THE OPERATIONAL ENERGY STRATEGY AND ITS CONSIDERATION IN THE DEFENSE ACQUISITION PROCESS 5. FUNDING...looked at the DOD Operational Energy Strategy evolution and how it applies to new and modified weapon systems, considering the three-legged table of the

  15. The Laser-Guided Bomb: Case History of a Development

    DTIC Science & Technology

    1974-06-01

    is part of Rand’s R&D and Acquisition Studies Program , supported by tJSAF Project RAND. Previous research done at Rarn has dealt with stu.les of...particular development programs , institutional aspects of Air Force acquisition decisiormaking, and improvements in system acquisition policy wieh respect...Corn- parative Study of Doctrine, Technology, and Organization in the USAF Ballistic and Cruise Missile Programs , 1950-1960, RM-48%3-PR, August 1966

  16. Defense Acquisition Reform: Where Do We Go From Here? A Compendium of Views by Leading Experts

    DTIC Science & Technology

    2014-10-02

    and government-owned production come close to matching the power of the Free Enterprise System broadly embraced by the U.S., including when providing...The defense acquisition process—along with most of our nation’s challenges, such as the provision of energy , building an economy, providing...Acquisition, Technology & Logistics. The projects have covered a wide variety of topics including, directed energy , unmanned vehicle, reviews of

  17. Data acquisition system for operational earth observation missions

    NASA Technical Reports Server (NTRS)

    Deerwester, J. M.; Alexander, D.; Arno, R. D.; Edsinger, L. E.; Norman, S. M.; Sinclair, K. F.; Tindle, E. L.; Wood, R. D.

    1972-01-01

    The data acquisition system capabilities expected to be available in the 1980 time period as part of operational Earth observation missions are identified. By data acquisition system is meant the sensor platform (spacecraft or aircraft), the sensors themselves and the communication system. Future capabilities and support requirements are projected for the following sensors: film camera, return beam vidicon, multispectral scanner, infrared scanner, infrared radiometer, microwave scanner, microwave radiometer, coherent side-looking radar, and scatterometer.

  18. Acquisition of Stereoscopic Particle Image Velocimetry System for Investigation of Unsteady Flows

    DTIC Science & Technology

    2016-04-30

    SECURITY CLASSIFICATION OF: The objective of the project titled “Acquisition of Stereoscopic Particle Image Velocimetry (S-PIV) System for...Distribution Unlimited UU UU UU UU 30-04-2016 1-Feb-2015 31-Jan-2016 Final Report: Acquisition of Stereoscopic Particle Image Velocimetry System For...ADDRESS (ES) U.S. Army Research Office P.O. Box 12211 Research Triangle Park, NC 27709-2211 Particle Image Velocimetry REPORT DOCUMENTATION PAGE 11

  19. SU-G-JeP3-06: Lower KV Image Dose Are Expected From a Limited-Angle Intra-Fractional Verification (LIVE) System for SBRT Treatments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ding, G; Yin, F; Ren, L

    Purpose: In order to track the tumor movement for patient positioning verification during arc treatment delivery or in between 3D/IMRT beams for stereotactic body radiation therapy (SBRT), the limited-angle kV projections acquisition simultaneously during arc treatment delivery or in-between static treatment beams as the gantry moves to the next beam angle was proposed. The purpose of this study is to estimate additional imaging dose resulting from multiple tomosynthesis acquisitions in-between static treatment beams and to compare with that of a conventional kV-CBCT acquisition. Methods: kV imaging system integrated into Varian TrueBeam accelerators was modeled using EGSnrc Monte Carlo user code,more » BEAMnrc and DOSXYZnrc code was used in dose calculations. The simulated realistic kV beams from the Varian TrueBeam OBI 1.5 system were used to calculate dose to patient based on CT images. Organ doses were analyzed using DVHs. The imaging dose to patient resulting from realistic multiple tomosynthesis acquisitions with each 25–30 degree kV source rotation between 6 treatment beam gantry angles was studied. Results: For a typical lung SBRT treatment delivery much lower (20–50%) kV imaging doses from the sum of realistic six tomosynthesis acquisitions with each 25–30 degree x-ray source rotation between six treatment beam gantry angles were observed compared to that from a single CBCT image acquisition. Conclusion: This work indicates that the kV imaging in this proposed Limited-angle Intra-fractional Verification (LIVE) System for SBRT Treatments has a negligible imaging dose increase. It is worth to note that the MV imaging dose caused by MV projection acquisition in-between static beams in LIVE can be minimized by restricting the imaging to the target region and reducing the number of projections acquired. For arc treatments, MV imaging acquisition in LIVE does not add additional imaging dose as the MV images are acquired from treatment beams directly during the treatment.« less

  20. 48 CFR 36.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements...

  1. 48 CFR 216.402-2 - Technical performance incentives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Technical performance incentives. 216.402-2 Section 216.402-2 Federal Acquisition Regulations System DEFENSE ACQUISITION... Contracts 216.402-2 Technical performance incentives. See PGI 216.402-2 for guidance on establishing...

  2. 78 FR 48331 - Defense Federal Acquisition Regulation Supplement: Release of Fundamental Research Information...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... Federal Acquisition Regulation Supplement: Release of Fundamental Research Information (DFARS Case 2012...) to provide guidance relating to the release of fundamental research information. This rule was... release of information on fundamental research projects and not safeguarding. This rule was initiated to...

  3. 76 FR 77887 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... Runway 4/22 extension, environmental assessment Runway 4/22 design--phase 3 Extend runway 4/22...: Snow removal equipment acquisition Airport pavement rehabilitation Master plan update Brief Description of Projects Approved For Collection: Design and permitting for runway 13/31 Easement acquisition...

  4. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  5. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  6. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  7. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  8. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  9. 24 CFR 574.630 - Displacement, relocation and real property acquisition.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Displacement, relocation and real... Other Federal Requirements § 574.630 Displacement, relocation and real property acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of this part, grantees and project...

  10. 24 CFR 574.630 - Displacement, relocation and real property acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Displacement, relocation and real... Other Federal Requirements § 574.630 Displacement, relocation and real property acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of this part, grantees and project...

  11. 24 CFR 886.138 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Displacement, relocation, and... Additional Assistance Program for Projects With HUD-Insured and HUD-Held Mortgages § 886.138 Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of...

  12. 24 CFR 886.138 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Displacement, relocation, and... Additional Assistance Program for Projects With HUD-Insured and HUD-Held Mortgages § 886.138 Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of...

  13. 24 CFR 886.338 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Displacement, relocation, and... Section 8 Housing Assistance Program for the Disposition of HUD-Owned Projects § 886.338 Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of...

  14. 24 CFR 886.338 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Displacement, relocation, and... Section 8 Housing Assistance Program for the Disposition of HUD-Owned Projects § 886.338 Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of...

  15. 24 CFR 886.338 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Displacement, relocation, and... Section 8 Housing Assistance Program for the Disposition of HUD-Owned Projects § 886.338 Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of...

  16. 24 CFR 886.138 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Displacement, relocation, and... Additional Assistance Program for Projects With HUD-Insured and HUD-Held Mortgages § 886.138 Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of...

  17. 24 CFR 886.338 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Displacement, relocation, and... Section 8 Housing Assistance Program for the Disposition of HUD-Owned Projects § 886.338 Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of...

  18. 24 CFR 886.338 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Displacement, relocation, and... Section 8 Housing Assistance Program for the Disposition of HUD-Owned Projects § 886.338 Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of...

  19. 24 CFR 574.630 - Displacement, relocation and real property acquisition.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Displacement, relocation and real... Other Federal Requirements § 574.630 Displacement, relocation and real property acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of this part, grantees and project...

  20. 24 CFR 574.630 - Displacement, relocation and real property acquisition.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Displacement, relocation and real... Other Federal Requirements § 574.630 Displacement, relocation and real property acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of this part, grantees and project...

  1. 24 CFR 886.138 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Displacement, relocation, and... Additional Assistance Program for Projects With HUD-Insured and HUD-Held Mortgages § 886.138 Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of...

  2. 24 CFR 886.138 - Displacement, relocation, and acquisition.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Displacement, relocation, and... Additional Assistance Program for Projects With HUD-Insured and HUD-Held Mortgages § 886.138 Displacement, relocation, and acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of...

  3. 24 CFR 574.630 - Displacement, relocation and real property acquisition.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Displacement, relocation and real... Other Federal Requirements § 574.630 Displacement, relocation and real property acquisition. (a) Minimizing displacement. Consistent with the other goals and objectives of this part, grantees and project...

  4. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1985-01-01

    Deep Space Network (DSN) progress in flight project support, tracking and data acquisition research and technology, network engineering, hardware and software implementation, and operation is discussed. In addition, developments in Earth-based radio technology as applied to geodynamics, astrophysics and the radio search for extraterrestrial intelligence are reported.

  5. Analysis of Design Changes on Navy Construction Projects

    DTIC Science & Technology

    1991-12-01

    Percent of Changes by Reason ...................... 47 6-6 Percent of Cost for Changes by Reaon ..............48 I- A vi GLOSSARY OF TERMS ARCHITECT...Department of Defense (DoD) for the acquisition of goods and services prior to 1084 which was replaced by the Federal Acquisition Regulations (FAR

  6. 20 CFR 435.23 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  7. 20 CFR 435.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  8. 20 CFR 435.23 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  9. 20 CFR 435.23 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  10. 20 CFR 435.23 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  11. A further examination of word frequency and age-of-acquisition effects in English lexical decision task performance: The role of frequency trajectory.

    PubMed

    Juhasz, Barbara J; Yap, Melvin J; Raoul, Akila; Kaye, Micaela

    2018-04-23

    Word frequency is an important predictor of lexical-decision task performance. The current study further examined the role of this variable by exploring the influence of frequency trajectory. Frequency trajectory is measured by how often a word occurs in childhood relative to adulthood. Past research on the role of this variable in word recognition has produced equivocal results. In the current study, words were selected based on their frequencies in Grade 1 (child frequency) and Grade 13 (college frequency). In Experiment 1, four frequency trajectory conditions were factorially examined in a lexical-decision task with English words: high-to-high (world), high-to-low (uncle), low-to-high (brain) and low-to-low (opera). an interaction between Grade 1 and college frequency demonstrated that words in the low-to-high condition were processed significantly faster and more accurately than words in the low-to-low condition, whereas the high-to-high and high-to-low conditions did not differ significantly. In Experiment 2, an advantage for words with an increasing frequency trajectory was also supported in regression analyses on both lexical decision and naming times for 3,039 items selected from the English Lexicon Project (Balota et al., 2007). This was replicated in Experiment 3, based on a regression analysis of 2,680 words from the British Lexicon Project (BLP; Keuleers, Lacey, Rastle, & Brysbaert, 2012). In all analyses, rated age-of-acquisition also significantly impacted word recognition. Together, the results suggest that the age at which a word is initially learned as well as its frequency trajectory across childhood impact performance in the lexical-decision task. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  12. 23 CFR 750.307 - FHWA project approval.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false FHWA project approval. 750.307 Section 750.307 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT HIGHWAY BEAUTIFICATION Outdoor Advertising (Acquisition of Rights of Sign and Sign Site Owners) § 750.307 FHWA project...

  13. 48 CFR 252.225-7042 - Authorization to perform.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Authorization to perform. 252.225-7042 Section 252.225-7042 Federal Acquisition Regulations System DEFENSE ACQUISITION... of Provisions And Clauses 252.225-7042 Authorization to perform. As prescribed in 225.1103(3), use...

  14. LOTT RANCH 3D PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larry Lawrence; Bruce Miller

    The Lott Ranch 3D seismic prospect located in Garza County, Texas is a project initiated in September of 1991 by the J.M. Huber Corp., a petroleum exploration and production company. By today's standards the 126 square mile project does not seem monumental, however at the time it was conceived it was the most intensive land 3D project ever attempted. Acquisition began in September of 1991 utilizing GEO-SEISMIC, INC., a seismic data contractor. The field parameters were selected by J.M. Huber, and were of a radical design. The recording instruments used were GeoCor IV amplifiers designed by Geosystems Inc., which recordmore » the data in signed bit format. It would not have been practical, if not impossible, to have processed the entire raw volume with the tools available at that time. The end result was a dataset that was thought to have little utility due to difficulties in processing the field data. In 1997, Yates Energy Corp. located in Roswell, New Mexico, formed a partnership to further develop the project. Through discussions and meetings with Pinnacle Seismic, it was determined that the original Lott Ranch 3D volume could be vastly improved upon reprocessing. Pinnacle Seismic had shown the viability of improving field-summed signed bit data on smaller 2D and 3D projects. Yates contracted Pinnacle Seismic Ltd. to perform the reprocessing. This project was initiated with high resolution being a priority. Much of the potential resolution was lost through the initial summing of the field data. Modern computers that are now being utilized have tremendous speed and storage capacities that were cost prohibitive when this data was initially processed. Software updates and capabilities offer a variety of quality control and statics resolution, which are pertinent to the Lott Ranch project. The reprocessing effort was very successful. The resulting processed data-set was then interpreted using modern PC-based interpretation and mapping software. Production data, log data, and scout ticket data were integrated with the 3D interpretations to evaluate drilling opportunities resulting in an initial three well drilling program. Thousands of miles of signed bit data exist. Much of this data was processed during a time when software and hardware capabilities were either incapable or cost prohibitive to glean the full potential of the data. In fact in some circles signed bit gained an undeserved reputation for being less than optimum. As a consequence much of the older signed bit data sits on the shelf long forgotten or overlooked. With the high cost of new acquisition and permitting it might behoove other exploration companies to reconsider resurrecting perfectly viable existing volumes and have them reprocessed at a fraction of the cost of new acquisition.« less

  15. Bilingual Education and Academic/Career Outreach for Newcomers: Project BEACON, 1988-89. Evaluation Section Report. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Gritzer, Glenn

    The Bilingual Education Academic/Career Outreach for Newcomers Program (Project BEACON) completed its fourth year. The goals of Project BEACON are to facilitate acquisition of English proficiency, develop native language literacy skills, and provide instruction in bilingual and English content area/vocational classes. The project served 753…

  16. 75 FR 8272 - Defense Federal Acquisition Regulation Supplement; Acquisition Strategies To Ensure Competition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... Competition Throughout the Life Cycle of Major Defense Acquisition Programs AGENCY: Defense Acquisition... subcontract level of the MDAP throughout its life cycle as a means to improve contractor performance; and (2...) throughout the program life cycle as a means to improve contractor performance; and (ii) Document the...

  17. The Impact of Simulation-Based Learning Experience on Critical Thinking Acquisition

    ERIC Educational Resources Information Center

    Rome, Candice

    2012-01-01

    The purpose of this comparative experimental project was to compare the impact of simulation-based learning experiences to traditional clinical rotations on critical thinking acquisition of associate nursing students within a maternal-child course. Innovative pedagogies have been integrated in nursing programs to augment inadequate clinical…

  18. 76 FR 11414 - Defense Federal Acquisition Regulation Supplement; Independent Research and Development Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... Acquisition Regulation Supplement; Independent Research and Development Technical Descriptions (DFARS Case... (DFARS) to require contractors to report independent research and development (IR&D) projects generating... the address shown below on or before May 2, 2011, to be considered in the formation of the final rule...

  19. Literacy for Migrants: An Ethnography of Literacy Acquisition among Nomads of Kutch.

    ERIC Educational Resources Information Center

    Dyer, Caroline; Choksi, Archana

    1997-01-01

    Recounts the creation of an ethnographic study of literacy acquisition among nomadic pastoralists in Gujarat (India). Describes the project's goals and methods, research problems, and experiments with Regenerated Freirean Literacy Through Empowering Community Techniques (REFLECT) methods for literacy learning. Concludes with suggestions for future…

  20. Acquisition Review Quarterly. Vol. 2, No. 3, Summer 1995

    DTIC Science & Technology

    1995-01-01

    ICOOPERATIVE ACQUISITION 231 PROJECTS IN THE PACIFIC RIM WHAT EVERY GOVERNMENT 247 EMPLOYEE SHOULD KNOW ABOUT POST-FEDERAL EMPLOYMENT R ESTR ICTIO N S OIN...Spending Run Deep. The Harris Survey. U.S. Senate. (1994). Armed Services Com- mittee. Confirmation Hearing of William Meadows, S.I. (1994). Labor

  1. Improving Vocabulary Acquisition with Multisensory Instruction

    ERIC Educational Resources Information Center

    D'Alesio, Rosemary; Scalia, Maureen T.; Zabel, Renee M.

    2007-01-01

    The purpose of this action research project was to improve student vocabulary acquisition through a multisensory, direct instructional approach. The study involved three teachers and a target population of 73 students in second and seventh grade classrooms. The intervention was implemented from September through December of 2006 and analyzed in…

  2. Knowledge Acquisition, Knowledge Programming, and Knowledge Refinement.

    ERIC Educational Resources Information Center

    Hayes-Roth, Frederick; And Others

    This report describes the principal findings and recommendations of a 2-year Rand research project on machine-aided knowledge acquisition and discusses the transfer of expertise from humans to machines, as well as the functions of planning, debugging, knowledge refinement, and autonomous machine learning. The relative advantages of humans and…

  3. 29 CFR 95.23 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...

  4. 38 CFR 49.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the... sharing or matching for donated equipment, buildings and land for which title passes to the recipient may... purpose of the award is to assist the recipient in the acquisition of equipment, buildings or land, the...

  5. 29 CFR 95.23 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...

  6. 29 CFR 95.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...

  7. 29 CFR 95.23 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...

  8. 10 CFR 600.123 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the... equipment, buildings and land for which title passes to the recipient may differ according to the purpose of... to assist the recipient in the acquisition of equipment, buildings or land, the total value of the...

  9. 38 CFR 49.23 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the... sharing or matching for donated equipment, buildings and land for which title passes to the recipient may... purpose of the award is to assist the recipient in the acquisition of equipment, buildings or land, the...

  10. 10 CFR 600.123 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the... equipment, buildings and land for which title passes to the recipient may differ according to the purpose of... to assist the recipient in the acquisition of equipment, buildings or land, the total value of the...

  11. 10 CFR 600.123 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the... equipment, buildings and land for which title passes to the recipient may differ according to the purpose of... to assist the recipient in the acquisition of equipment, buildings or land, the total value of the...

  12. 38 CFR 49.23 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the... sharing or matching for donated equipment, buildings and land for which title passes to the recipient may... purpose of the award is to assist the recipient in the acquisition of equipment, buildings or land, the...

  13. 38 CFR 49.23 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the... sharing or matching for donated equipment, buildings and land for which title passes to the recipient may... purpose of the award is to assist the recipient in the acquisition of equipment, buildings or land, the...

  14. 38 CFR 49.23 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the... sharing or matching for donated equipment, buildings and land for which title passes to the recipient may... purpose of the award is to assist the recipient in the acquisition of equipment, buildings or land, the...

  15. 10 CFR 600.123 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the... equipment, buildings and land for which title passes to the recipient may differ according to the purpose of... to assist the recipient in the acquisition of equipment, buildings or land, the total value of the...

  16. 10 CFR 600.123 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the... equipment, buildings and land for which title passes to the recipient may differ according to the purpose of... to assist the recipient in the acquisition of equipment, buildings or land, the total value of the...

  17. 29 CFR 95.23 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...

  18. 14 CFR § 1260.123 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the... matching for donated equipment, buildings and land for which title passes to the recipient may differ.... (1) If the purpose of the award is to assist the recipient in the acquisition of equipment, buildings...

  19. 48 CFR 1552.237-70 - Contract publication review procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract publication review procedures. 1552.237-70 Section 1552.237-70 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION... Project Officer, at least 30 days prior to publication, a copy of any paper, article, or other...

  20. Acquisition of Expository Writing Skills. Technical Report No. 421.

    ERIC Educational Resources Information Center

    Raphael, Taffy E.; And Others

    Four studies by the Cognitive Strategy Instruction in Writing project at the Institute for Research on Teaching, Michigan State University, examined the acquisition of expository writing skills in fifth and sixth grade students. The first study examined the effects of teaching sixth grade students about comparison/contrast text structure. Results…

  1. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  2. FFP/NREL Collaboration on Hydrokinetic River Turbine Testing: Cooperative Research and Development Final Report, CRADA Number CRD-12-00473

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Driscoll, F.

    2013-04-01

    This shared resources CRADA defines collaborations between the National Renewable Energy Laboratory (NREL) and Free Flow Power (FFP) set forth in the following Joint Work Statement. Under the terms and conditions described in this CRADA, NREL and FFP will collaborate on the testing of FFP's hydrokinetic river turbine project on the Mississippi River (baseline location near Baton Rouge, LA; alternate location near Greenville, MS). NREL and FFP will work together to develop testing plans, instrumentation, and data acquisition systems; and perform field measurements.

  3. Contribution of wind energy to the energy balance of a combined solar and wind energy system. Part 1: System description, data acquisition and system performance

    NASA Astrophysics Data System (ADS)

    Ferger, R.; Machens, U.

    1985-05-01

    A one-family house was equipped with a combined solar and wind energy system plus a night storage heater to measure the seasonal complementary contribution of wind and solar energy to energy demand. Project implementation, problems encountered and modifications to the initial system are described. Meteorological and operational data and house consumption data were recorded on computer-based measuring system. Data on the combined effects of and interdependence between solar collector and wind energy converter are discussed.

  4. Task-based optimization of image reconstruction in breast CT

    NASA Astrophysics Data System (ADS)

    Sanchez, Adrian A.; Sidky, Emil Y.; Pan, Xiaochuan

    2014-03-01

    We demonstrate a task-based assessment of image quality in dedicated breast CT in order to optimize the number of projection views acquired. The methodology we employ is based on the Hotelling Observer (HO) and its associated metrics. We consider two tasks: the Rayleigh task of discerning between two resolvable objects and a single larger object, and the signal detection task of classifying an image as belonging to either a signalpresent or signal-absent hypothesis. HO SNR values are computed for 50, 100, 200, 500, and 1000 projection view images, with the total imaging radiation dose held constant. We use the conventional fan-beam FBP algorithm and investigate the effect of varying the width of a Hanning window used in the reconstruction, since this affects both the noise properties of the image and the under-sampling artifacts which can arise in the case of sparse-view acquisitions. Our results demonstrate that fewer projection views should be used in order to increase HO performance, which in this case constitutes an upper-bound on human observer performance. However, the impact on HO SNR of using fewer projection views, each with a higher dose, is not as significant as the impact of employing regularization in the FBP reconstruction through a Hanning filter.

  5. Three-Dimensional Weighting in Cone Beam FBP Reconstruction and Its Transformation Over Geometries.

    PubMed

    Tang, Shaojie; Huang, Kuidong; Cheng, Yunyong; Niu, Tianye; Tang, Xiangyang

    2018-06-01

    With substantially increased number of detector rows in multidetector CT (MDCT), axial scan with projection data acquired along a circular source trajectory has become the method-of-choice in increasing clinical applications. Recognizing the practical relevance of image reconstruction directly from the projection data acquired in the native cone beam (CB) geometry, especially in scenarios wherein the most achievable in-plane resolution is desirable, we present a three-dimensional (3-D) weighted CB-FBP algorithm in such geometry in this paper. We start the algorithm's derivation in the cone-parallel geometry. Via changing of variables, taking the Jacobian into account and making heuristic and empirical assumptions, we arrive at the formulas for 3-D weighted image reconstruction in the native CB geometry. Using the projection data simulated by computer and acquired by an MDCT scanner, we evaluate and verify performance of the proposed algorithm for image reconstruction directly from projection data acquired in the native CB geometry. The preliminary data show that the proposed algorithm performs as well as the 3-D weighted CB-FBP algorithm in the cone-parallel geometry. The proposed algorithm is anticipated to find its utility in extensive clinical and preclinical applications wherein the reconstruction of images in the native CB geometry, i.e., the geometry for data acquisition, is of relevance.

  6. 24 CFR 241.1015 - Processing of applications and required fees.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AND OTHER AUTHORITIES SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Insurance for Equity Loans... acquisition loan on a project shall be submitted by an approved lender and by the owner or purchaser of the project to the Commissioner on a form prescribed by the Commissioner. No application shall be considered...

  7. 23 CFR 630.106 - Authorization to proceed.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... estimate when the bid is approved, a project phase is completed, a design change is approved, etc...) phase(s) through the selection of a location. (3) Projects for ROW acquisition in hardship and... reflect any substantive change in the bids received as compared to the STD's estimated cost of the project...

  8. 23 CFR 630.106 - Authorization to proceed.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... estimate when the bid is approved, a project phase is completed, a design change is approved, etc...) phase(s) through the selection of a location. (3) Projects for ROW acquisition in hardship and... reflect any substantive change in the bids received as compared to the STD's estimated cost of the project...

  9. The Early Childhood Interactive Technology Literacy Curriculum Project: A Final Report.

    ERIC Educational Resources Information Center

    Hutinger, Patricia; Robinsosn, Linda; Schneider, Carol; Johanson, Joyce

    This final report describes the activities and outcomes of the Interactive Technology Literacy Curriculum (ITLC) project. This federally funded 5-year model demonstration project was designed to advance the availability, quality, use and effectiveness of computer technology in addressing the acquisition of emergent literacy among young children…

  10. 23 CFR 630.106 - Authorization to proceed.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... estimate when the bid is approved, a project phase is completed, a design change is approved, etc...) phase(s) through the selection of a location. (3) Projects for ROW acquisition in hardship and... reflect any substantive change in the bids received as compared to the STD's estimated cost of the project...

  11. 7 CFR 3565.205 - Eligible uses of loan proceeds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... fees for projects proposed for a guaranteed loan provided the costs and features are reasonable and... loan may be used for the following purposes relating to the project. (1) New construction costs of the project; (2) Moderate or substantial rehabilitation of buildings and acquisition costs when related to the...

  12. Feasibility Study of Commercial Markets for New Sample Acquisition Devices

    NASA Technical Reports Server (NTRS)

    Brady, Collin; Coyne, Jim; Bilen, Sven G.; Kisenwether, Liz; Miller, Garry; Mueller, Robert P.; Zacny, Kris

    2010-01-01

    The NASA Exploration Systems Mission Directorate (ESMD) and Penn State technology commercialization project was designed to assist in the maturation of a NASA SBIR Phase III technology. The project was funded by NASA's ESMD Education group with oversight from the Surface Systems Office at NASA Kennedy Space Center in the Engineering Directorate. Two Penn State engineering student interns managed the project with support from Honeybee Robotics and NASA Kennedy Space Center. The objective was to find an opportunity to integrate SBIR-developed Regolith Extractor and Sampling Technology as the payload for the future Lunar Lander or Rover missions. The team was able to identify two potential Google Lunar X Prize organizations with considerable interest in utilizing regolith acquisition and transfer technology.

  13. UK Defence Acquisition Process for NEC: Transaction Governance within an Integrated Project Team

    DTIC Science & Technology

    2009-04-22

    3-tier framework for a study of the acquisition of an Advance Military Vehicle (AMV), we explore the shaping of the buyer -supplier relationship in...of an Advance Military Vehicle (AMV), we explore the shaping of the buyer -supplier relationship in the context of the UK defence acquisition process...of the buyer , the MoD, and how this impacts its suppliers in the defence industrial base. An historical review of defence industrial relations is

  14. Relative Sensor with 4(pi) Coverage for Formation Flying Missions

    NASA Technical Reports Server (NTRS)

    Tien, Jeffrey Y.; Purcell, George H., Jr.; Sirinivasan, Jeffrey M.; Young, Lawrence E.

    2004-01-01

    The Terrestrial Planet Finder (TPF) pre-project, an element of NASA's Origins program, is currently developing two architectures for a mission to search for earth-like planets around nearby stars. One of the architectures being developed is the Formation Flying Interferometer (FFI). The FFI is envisioned to consist of up to seven spacecraft (as many as six 'collectors' with IR telescopes, and a 'combiner') flying in precise formation within f 1 cm of pre-determined trajectories for synchronized observations. The spacecraft-to-spacecraft separations are variable between 20 m and 100 m or more during observations to support various configurations of the interferometer in the planet-finding mode. The challenges involved with TPF autonomous operations, ranging from formation acquisition and formation maneuvering to high precision formation control during science observations, are unprecedented. In this paper we discuss the development of the formation acquisition sensor, which uses novel modulation and duplexing schemes to enable fast signal acquisition, multiple-spacecraft operation, and mitigation of inherent jamming conditions, while providing precise formation sensing and integrated radar capability. This approach performs delay synthesis and carrier cycle ambiguity resolution to improve range measurement, and uses differential carrier cycle ambiguity resolution to make precise bearing angle measurements without calibration maneuvers.

  15. Relative Sensor with 4Pi Coverage for Formation Flying Missions

    NASA Technical Reports Server (NTRS)

    Tien, Jeffrey Y.; Purcell, George H., Jr.; Srinivasan, Jeffrey M.; Young, Lawrence E.

    2004-01-01

    The Terrestrial Planet Finder (TPF) pre-project, an element of NASA s Origins program, is currently developing two architectures for a mission to search for earth-like planets around nearby stars. One of the architectures being developed is the Formation Flying Interferometer (FFI). The FFI is envisioned to consist of up to seven spacecraft (as many as six "collectors" with IR telescopes, and a "combiner") flying in precise formation within +/-1 cm of pre-determined trajectories for synchronized observations. The spacecraft-to-spacecraft separations are variable between 20 m and 100 m or more during observations to support various configurations of the interferometer in the planet-finding mode. The challenges involved with TPF autonomous operations, ranging from formation acquisition and formation maneuvering to high precision formation control during science observations, are unprecedented. In this paper we discuss the development of the formation acquisition sensor, which uses novel modulation and duplexing schemes to enable fast signal acquisition, multiple-spacecraft operation, and mitigation of inherent jamming conditions, while providing precise formation sensing and integrated radar capability. This approach performs delay synthesis and carrier cycle ambiguity resolution to improve range measurement, and uses differential carrier cycle ambiguity resolution to make precise bearing angle measurements without calibration maneuvers.

  16. Pilocarpine and physostigmine attenuate spatial memory impairments produced by lesions of the nucleus basalis magnocellularis.

    PubMed

    Murray, C L; Fibiger, H C

    1986-02-01

    The effects of bilateral ibotenic acid-induced lesions of the nucleus basalis magnocellularis (nBM) on the acquisition and retention of several spatial memory tasks were studied in the rat. Maintenance of spatial memory in a food search task was impaired following nBM lesions. Acquisition of spontaneous alternation and reinforced alternation in a T-maze was also significantly impaired in animals with these lesions. In contrast, the animals with nBM lesions were not impaired in the acquisition of a position habit in a T-maze. In several of the tasks there was evidence of some learning in the lesion animals after substantial training, although they were significantly deficient when compared with the controls. Administration of the cholinergic agonists physostigmine sulfate or pilocarpine nitrate prior to behavioral testing resulted in a rapid and significant improvement in the performance of the lesion animals. The ibotenate-induced lesions significantly reduced the activity of choline acetyltransferase (CAT) in the anterior and the posterior neocortex. Hippocampal CAT activity was not changed. The results indicate that the cholinergic projections originating in the nBM are involved in the learning and memory of spatial tasks.

  17. Diuretic-enhanced gadolinium excretory MR urography: comparison of conventional gradient-echo sequences and echo-planar imaging.

    PubMed

    Nolte-Ernsting, C C; Tacke, J; Adam, G B; Haage, P; Jung, P; Jakse, G; Günther, R W

    2001-01-01

    The aim of this study was to investigate the utility of different gadolinium-enhanced T1-weighted gradient-echo techniques in excretory MR urography. In 74 urologic patients, excretory MR urography was performed using various T1-weighted gradient-echo (GRE) sequences after injection of gadolinium-DTPA and low-dose furosemide. The examinations included conventional GRE sequences and echo-planar imaging (GRE EPI), both obtained with 3D data sets and 2D projection images. Breath-hold acquisition was used primarily. In 20 of 74 examinations, we compared breath-hold imaging with respiratory gating. Breath-hold imaging was significantly superior to respiratory gating for the visualization of pelvicaliceal systems, but not for the ureters. Complete MR urograms were obtained within 14-20 s using 3D GRE EPI sequences and in 20-30 s with conventional 3D GRE sequences. Ghost artefacts caused by ureteral peristalsis often occurred with conventional 3D GRE imaging and were almost completely suppressed in EPI sequences (p < 0.0001). Susceptibility effects were more pronounced on GRE EPI MR urograms and calculi measured 0.8-21.7% greater in diameter compared with conventional GRE sequences. Increased spatial resolution degraded the image quality only in GRE-EPI urograms. In projection MR urography, the entire pelvicaliceal system was imaged by acquisition of a fast single-slice sequence and the conventional 2D GRE technique provided superior morphological accuracy than 2D GRE EPI projection images (p < 0.0003). Fast 3D GRE EPI sequences improve the clinical practicability of excretory MR urography especially in old or critically ill patients unable to suspend breathing for more than 20 s. Conventional GRE sequences are superior to EPI in high-resolution detail MR urograms and in projection imaging.

  18. 48 CFR 53.301-25 - Performance Bond.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Performance Bond. 53.301-25 Section 53.301-25 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Illustrations of Forms 53.301-25 Performance Bond. ER29AP14.003 ER29AP14.004 [79...

  19. 48 CFR 53.301-25 - Performance Bond.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Performance Bond. 53.301-25 Section 53.301-25 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Illustrations of Forms 53.301-25 Performance Bond. ER18DE98.007 ER18DE98.008 [63...

  20. 48 CFR 53.301-25 - Performance Bond.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Performance Bond. 53.301-25 Section 53.301-25 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Illustrations of Forms 53.301-25 Performance Bond. ER18DE98.007 ER18DE98.008 [63...

  1. 48 CFR 53.301-25 - Performance Bond.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Performance Bond. 53.301-25 Section 53.301-25 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Illustrations of Forms 53.301-25 Performance Bond. ER18DE98.007 ER18DE98.008 [63...

  2. 48 CFR 53.301-25 - Performance Bond.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Performance Bond. 53.301-25 Section 53.301-25 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Illustrations of Forms 53.301-25 Performance Bond. ER18DE98.007 ER18DE98.008 [63...

  3. Network Performance Measurements for NASA's Earth Observation System

    NASA Technical Reports Server (NTRS)

    Loiacono, Joe; Gormain, Andy; Smith, Jeff

    2004-01-01

    NASA's Earth Observation System (EOS) Project studies all aspects of planet Earth from space, including climate change, and ocean, ice, land, and vegetation characteristics. It consists of about 20 satellite missions over a period of about a decade. Extensive collaboration is used, both with other US. agencies (e.g., National Oceanic and Atmospheric Administration (NOA), United States Geological Survey (USGS), Department of Defense (DoD), and international agencies (e.g., European Space Agency (ESA), Japan Aerospace Exploration Agency (JAXA)), to improve cost effectiveness and obtain otherwise unavailable data. Scientific researchers are located at research institutions worldwide, primarily government research facilities and research universities. The EOS project makes extensive use of networks to support data acquisition, data production, and data distribution. Many of these functions impose requirements on the networks, including throughput and availability. In order to verify that these requirements are being met, and be pro-active in recognizing problems, NASA conducts on-going performance measurements. The purpose of this paper is to examine techniques used by NASA to measure the performance of the networks used by EOSDIS (EOS Data and Information System) and to indicate how this performance information is used.

  4. [Current problems in the data acquisition of digitized virtual human and the countermeasures].

    PubMed

    Zhong, Shi-zhen; Yuan, Lin

    2003-06-01

    As a relatively new field of medical science research that has attracted the attention from worldwide researchers, study of digitized virtual human still awaits long-term dedicated effort for its full development. In the full array of research projects of the integrated Virtual Chinese Human project, virtual visible human, virtual physical human, virtual physiome, and intellectualized virtual human must be included as the four essential constitutional opponents. The primary importance should be given to solving the problems concerning the data acquisition for the dataset of this immense project. Currently 9 virtual human datasets have been established worldwide, which are subjected to critical analyses in the paper with special attention given to the problems in the data storage and the techniques employed, for instance, in these datasets. On the basis of current research status of Virtual Chinese Human project, the authors propose some countermeasures for solving the problems in the data acquisition for the dataset, which include (1) giving the priority to the quality control instead of merely racing for quantity and speed, and (2) improving the setting up of the markers specific for the tissues and organs to meet the requirement from information technology, (3) with also attention to the development potential of the dataset which should have explicit pertinence to specific actual applications.

  5. 24 CFR 241.1065 - Maximum loan amount-loans insured in connection with a plan of action under subpart C of part 248...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Insurance for Equity Loans and Acquisition Loans... percent of the owner's equity in the project, as determined by the Commissioner. Notwithstanding the above... property, can be supported by 90 percent of the projected net operating income of the project, as...

  6. Simulation of the Beating Heart Based on Physically Modeling aDeformable Balloon

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rohmer, Damien; Sitek, Arkadiusz; Gullberg, Grant T.

    2006-07-18

    The motion of the beating heart is complex and createsartifacts in SPECT and x-ray CT images. Phantoms such as the JaszczakDynamic Cardiac Phantom are used to simulate cardiac motion forevaluationof acquisition and data processing protocols used for cardiacimaging. Two concentric elastic membranes filled with water are connectedto tubing and pump apparatus for creating fluid flow in and out of theinner volume to simulate motion of the heart. In the present report, themovement of two concentric balloons is solved numerically in order tocreate a computer simulation of the motion of the moving membranes in theJaszczak Dynamic Cardiac Phantom. A system ofmore » differential equations,based on the physical properties, determine the motion. Two methods aretested for solving the system of differential equations. The results ofboth methods are similar providing a final shape that does not convergeto a trivial circular profile. Finally,a tomographic imaging simulationis performed by acquiring static projections of the moving shape andreconstructing the result to observe motion artifacts. Two cases aretaken into account: in one case each projection angle is sampled for ashort time interval and the other case is sampled for a longer timeinterval. The longer sampling acquisition shows a clear improvement indecreasing the tomographic streaking artifacts.« less

  7. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2011-01-01

    The now-cancelled Constellation Program included the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, were planned to be manned space vehicles while the third element was much more diverse and included several sub-elements. Among other things, these sub-elements were Rovers and a Lunar Habitat. The planned missions involving these systems and vehicles included several risks and design challenges. Due to the unique thermal operating environment, many of these risks and challenges were associated with the vehicles thermal control system. NASA s Exploration Technology Development Program (ETDP) consisted of various technology development projects. The project chartered with mitigating the aforementioned thermal risks and design challenges was the Thermal Control System Development for Exploration Project. These risks and design challenges were being addressed through a rigorous technology development process that was planned to culminate with an integrated thermal control system test. Although the technologies being developed were originally aimed towards mitigating specific Constellation risks, the technology development process is being continued within a new program. This continued effort is justified by the fact that many of the technologies are generically applicable to future spacecraft thermal control systems. The current paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing a material compatibility assessment for a promising thermal control system working fluid. The to-date progress and lessons-learned from these development efforts will be discussed throughout the paper.

  8. Performance of hybrid system for fluorescence and micro-computed tomography in synchronous mode

    NASA Astrophysics Data System (ADS)

    Liu, Xin; Zhang, Yi; Liu, Fei; Guo, Xiaolian; Wang, Xin; Bai, Jing

    2010-11-01

    Fluorescence diffuse optical tomography (FDOT) plays an important role in studying physiological and pathological processes of small animals in vivo. The low spatial resolution, however, limits the ability of FDOT in resolving the biodistributions of fluorescent markers. The anatomical information provided by X-ray computed tomography (CT) can be used to improve the image quality of FDOT. However, in most hybrid FDOT/CT systems, the projection data sets of optics and X-ray are acquired sequentially, which increases the acquisition time and bring in the unwanted soft tissue displacement. In this paper, we evaluate the performance of a synchronous FDOT/CT system, which allows for faster and concurrent imaging. Compared with previous FDOT/CT systems, the two subsystems (FDOT and CT) acquire projection images in synchronous mode, so the body position can keep consistent in the same projection data acquired by both subsystems. The experimental results of phantom and in vivo experiments suggest that the reconstruction quality of FDOT can be significantly improved when structural a priori information is utilized to constrain the reconstruction process. On the other hand, the synchronous FDOT/CT system decreases the imaging time.

  9. Recent results and performance of the multi-gap resistive plate chambers network for the EEE Project

    NASA Astrophysics Data System (ADS)

    Abbrescia, M.; Avanzini, C.; Baldini, L.; Baldini Ferroli, R.; Batignani, G.; Bencivenni, G.; Bossini, E.; Chiavassa, A.; Cicalò, C.; Cifarelli, L.; Coccia, E.; Corvaglia, A.; De Gruttola, D.; De Pasquale, S.; Di Giovanni, A.; D`Incecco, M.; Dreucci, M.; Fabbri, F. L.; Fattibene, E.; Ferraro, A.; Frolov, V.; Galeotti, P.; Garbini, M.; Gemme, G.; Gnesi, I.; Grazzi, S.; Gustavino, C.; Hatzifotiadou, D.; La Rocca, P.; Licciulli, F.; Maggiora, A.; Maragoto Rodriguez, O.; Maron, G.; Martelli, B.; Mazziotta, M. N.; Miozzi, S.; Nania, R.; Noferini, F.; Nozzoli, F.; Panareo, M.; Panetta, M. P.; Paoletti, R.; Park, W.; Perasso, L.; Pilo, F.; Piragino, G.; Riggi, F.; Righini, G. C.; Sartorelli, G.; Scapparone, E.; Schioppa, M.; Scribano, A.; Selvi, M.; Serci, S.; Siddi, E.; Squarcia, S.; Stori, L.; Taiuti, M.; Terreni, G.; Visnyei, O. B.; Vistoli, M. C.; Votano, L.; Williams, M. C. S.; Zani, S.; Zichichi, A.; Zuyeusky, R.

    2016-11-01

    The Extreme Energy Events (EEE) Project is devoted to the study of Extensive Atmospheric Showers through a network of muon telescopes, installed in High Schools, with the further aim of introducing young students to particle and astroparticle physics. Each telescope is a tracking detector composed of three Multi-gap Resistive Plate Chambers (MRPC) with an active area of 1.60 × 0.80 m2. Their characteristics are similar to the ones built for the Time Of Flight array of the ALICE Experimentat LHC . The EEE Project started with a few pilot towns, where the telescopes have been taking data since 2008, and it has been constantly extended, reaching at present more than 50 MRPCs telescopes. They are spread across Italy with two additional stations at CERN, covering an area of around 3 × 105 km2, with a total surface area for all the MRPCs of 190 m2. A comprehensive description of the MRPCs network is reported here: efficiency, time and spatial resolution measured using cosmic rays hitting the telescopes. The most recent results on the detector and physics performance from a series of coordinated data acquisition periods are also presented.

  10. The Mammographic Head Demonstrator Developed in the Framework of the “IMI” Project:. First Imaging Tests Results

    NASA Astrophysics Data System (ADS)

    Bisogni, Maria Giuseppina

    2006-04-01

    In this paper we report on the performances and the first imaging test results of a digital mammographic demonstrator based on GaAs pixel detectors. The heart of this prototype is the X-ray detection unit, which is a GaAs pixel sensor read-out by the PCC/MEDIPIXI circuit. Since the active area of the sensor is 1 cm2, 18 detectors have been organized in two staggered rows of nine chips each. To cover the typical mammographic format (18 × 24 cm2) a linear scanning is performed by means of a stepper motor. The system is integrated in mammographic equipment comprehending the X-ray tube, the bias and data acquisition systems and the PC-based control system. The prototype has been developed in the framework of the integrated Mammographic Imaging (IMI) project, an industrial research activity aiming to develop innovative instrumentation for morphologic and functional imaging. The project has been supported by the Italian Ministry of Education, University and Research (MIUR) and by five Italian High Tech companies in collaboration with the universities of Ferrara, Roma “La Sapienza”, Pisa and the INFN.

  11. IEC 61511 and the capital project process--a protective management system approach.

    PubMed

    Summers, Angela E

    2006-03-17

    This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.

  12. Projection technologies for imaging sensor calibration, characterization, and HWIL testing at AEDC

    NASA Astrophysics Data System (ADS)

    Lowry, H. S.; Breeden, M. F.; Crider, D. H.; Steely, S. L.; Nicholson, R. A.; Labello, J. M.

    2010-04-01

    The characterization, calibration, and mission simulation testing of imaging sensors require continual involvement in the development and evaluation of radiometric projection technologies. Arnold Engineering Development Center (AEDC) uses these technologies to perform hardware-in-the-loop (HWIL) testing with high-fidelity complex scene projection technologies that involve sophisticated radiometric source calibration systems to validate sensor mission performance. Testing with the National Institute of Standards and Technology (NIST) Ballistic Missile Defense Organization (BMDO) transfer radiometer (BXR) and Missile Defense Agency (MDA) transfer radiometer (MDXR) offers improved radiometric and temporal fidelity in this cold-background environment. The development of hardware and test methodologies to accommodate wide field of view (WFOV), polarimetric, and multi/hyperspectral imaging systems is being pursued to support a variety of program needs such as space situational awareness (SSA). Test techniques for the acquisition of data needed for scene generation models (solar/lunar exclusion, radiation effects, etc.) are also needed and are being sought. The extension of HWIL testing to the 7V Chamber requires the upgrade of the current satellite emulation scene generation system. This paper provides an overview of pertinent technologies being investigated and implemented at AEDC.

  13. 78 FR 34091 - Wausau Paper Mills, LLC; Specialty Papers Acquisition, LLC; Notice of Application for Transfer of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 2161-034; 2207-045] Wausau Paper Mills, LLC; Specialty Papers Acquisition, LLC; Notice of Application for Transfer of Licenses, and Soliciting Comments and Motions To Intervene On April 22, 2013, Wausau Paper Mills, LLC (transferor) and...

  14. Parameter Resetting in Second Language Acquisition. University Research Institute Final Project Report, 1987-88.

    ERIC Educational Resources Information Center

    Phinney-Liapis, Marianne

    Analyses of the Null Subject Parameter (NSP) suggest that several factors may influence the resetting process for second language acquisition, such as specific "trigger" data, awareness of agreement as a part of awareness of agreement (INFL), and stylistic rules such as subject postposing and anaphoric reference. Four tests were…

  15. Extensive Reading in Enhancing Lexical Chunks Acquisition

    ERIC Educational Resources Information Center

    Pereyra, Nilsa

    2015-01-01

    The purpose of this action research was to investigate the effect of extensive reading and related activities on the acquisition of lexical chunks in EFL students. Seven adult EFL learners with an Intermediate level volunteered to take part in the 16 week project following Extensive Reading principles combined with tasks based on the Lexical…

  16. 45 CFR 2543.23 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings and land for which title passes to the recipient may differ according to the purpose of the award: (1) If the purpose of the award is to assist the recipient in the acquisition of equipment, buildings...

  17. 45 CFR 2543.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings and land for which title passes to the recipient may differ according to the purpose of the award: (1) If the purpose of the award is to assist the recipient in the acquisition of equipment, buildings...

  18. 45 CFR 2543.23 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings and land for which title passes to the recipient may differ according to the purpose of the award: (1) If the purpose of the award is to assist the recipient in the acquisition of equipment, buildings...

  19. 45 CFR 2543.23 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings and land for which title passes to the recipient may differ according to the purpose of the award: (1) If the purpose of the award is to assist the recipient in the acquisition of equipment, buildings...

  20. 45 CFR 2543.23 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings and land for which title passes to the recipient may differ according to the purpose of the award: (1) If the purpose of the award is to assist the recipient in the acquisition of equipment, buildings...

Top