Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vigil-Holterman, Luciana R.
2012-05-07
This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of themore » open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.« less
Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Management
The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
... Grant Assurance Obligations Due to Airport Layout Plan Revision at Mather Airport, Sacramento, CA AGENCY... Mather Airport, Sacramento, California, which will provide for a release from the Grant Agreement... the closure of Mather Air Force Base pursuant to the Defense Base Closure and Realignment Act of 1988...
Report to Congress on a Compliance Plan for the Underground Storage Tank Program
Learn about identification of USTs that are not in compliance with Subtitle I of the Solid Waste Disposal Act or are in temporary closure, and determine the ownership of USTs not in compliance or in temporary closure
DOE Office of Scientific and Technical Information (OSTI.GOV)
PRIGNANO, A.L.
2003-06-25
This closure plan describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) glovebox HA-20MB that housed an interim status ''Resource Conservation and Recovery Act'' (RCRA) of 1976 treatment unit. This closure plan is certified and submitted to Ecology for incorporation into the Hanford Facility RCRA Permit (HF RCRA Permit) in accordance with Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement; TPA) Milestone M-83-30 requiring submittal of a certified closure plan for ''glovebox HA-20MB'' by July 31, 2003. Glovebox HA-20MB is located within the 231-5Z Building in the 200 West Area of the Hanford Facility.more » Currently glovebox HA-20MB is being used for non-RCRA analytical purposes. The schedule of closure activities under this plan supports completion of TPA Milestone M-83-44 to deactivate and prepare for dismantlement the above grade portions of the 234-5Z and ZA, 243-Z, and 291-Z and 291-Z-1 stack buildings by September 30, 2015. Under this closure plan, glovebox HA-20MB will undergo clean closure to the performance standards of Washington Administrative Code (WAC) 173-303-610 with respect to all dangerous waste contamination from glovebox HA-20MB RCRA operations. Because the intention is to clean close the PFP treatment unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. Any information on radionuclides is provided only for general knowledge. Clearance form only sent to RHA.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-05-01
In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analysesmore » and forms, inspection logs, equipment identification, etc.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... Microsoft Word, Microsoft Excel, WordPerfect, or Adobe PDF file formats only. FOR FURTHER INFORMATION...). The closure was implemented based on advice from the U.S. Food and Drug Administration (FDA) after... Management Plan (FMP). Since the implementation of the closure, NOAA's National Ocean Service has provided...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure ofmore » each of the following hazardous waste management units regulated under RCRA.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mattlin, E.; Charboneau, S.; Johnston, G.
2007-07-01
The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the Resource Conservation and Recovery Act of 1976 (RCRA) and Washington State Hazardous Waste Management Act, RCW 70.105, , have been deactivated and are being actively decommissioned under the provisions of the Hanford Federal Facility Agreement and Consent Order (HFFACO), RCRA and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) 42 U.S.C. 9601 et seq. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4,more » D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building. The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground piping from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions will address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the Hanford Facility Dangerous Waste Closure Plan, 241-Z Treatment and Storage Tanks. Under the RCRA closure plan, the 241-Z TSD unit is anticipated to undergo clean closure to the performance standards of the State of Washington with respect to dangerous waste contamination from RCRA operations. The TSD unit will be clean closed if physical closure activities identified in the plan achieve clean closure standards for all 241-Z locations. Clean closed 241-Z treatment and storage tanks, equipment and/or structures will remain after RCRA clean closure for future disposition in conjunction with PFP decommissioning activities which are integrated with CERCLA. (authors)« less
Base Realignment and Closure (BRAC) Environmental Restoration Program Management Plan
1999-04-01
ENVIRONMENTAL PROGRAM 5 4.1 Environmental Restoration (Cleanup, Compliance and Unexploded Ordnance) 6 4.2 National Environmental Policy Act (NEPA...Realignment Act) to create a process to close bases and realign the force infrastructure. The law addressed National Environmental Policy Act (NEPA...primarily through provisions contained in the National Defense Authorization Acts for Fiscal Years 1992 through 1997. Appendix A of the BRAC Reuse
Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents ofmore » concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.« less
40 CFR 264.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...
40 CFR 264.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...
40 CFR 264.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...
40 CFR 264.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...
40 CFR 264.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
Code of Federal Regulations, 2011 CFR
2011-04-01
... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES REVITALIZING BASE CLOSURE COMMUNITIES AND COMMUNITY ASSISTANCE-COMMUNITY REDEVELOPMENT... Response, Compensation, and Liability Act (42 U.S.C. 9601 et seq.). Communities in the vicinity of the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The module explains the difference between closure and post-closure. It lists the types of facilities that are subject to closure/post-closures and defines the difference between partial and final closure. It specifies who submits a closure plan and when a closure plan must be submitted, lists the steps in the process, and states the time frame for submittal. It identifies when and how a closure must be amended. It explains the time frame for notification of closure and the deadlines for beginning and completing closure. It specifies which facilities need contingent post-closure plans and lists and the elements of post-closure andmore » cites the requirements. It specifies the conditions and timing for amending a post-closure plan and states who must certify closure/post-closure.« less
43 CFR 3809.420 - What performance standards apply to my notice or plan of operations?
Code of Federal Regulations, 2013 CFR
2013-10-01
... or facility maintenance after project closure. Long-term, or post-mining, effluent capture and... the Resource Conservation and Recovery Act (42 U.S.C. 6901 et seq.). All garbage, refuse or waste... design. (iv) You must construct a secondary containment system around vats, tanks, or recovery circuits...
43 CFR 3809.420 - What performance standards apply to my notice or plan of operations?
Code of Federal Regulations, 2012 CFR
2012-10-01
... or facility maintenance after project closure. Long-term, or post-mining, effluent capture and... the Resource Conservation and Recovery Act (42 U.S.C. 6901 et seq.). All garbage, refuse or waste... design. (iv) You must construct a secondary containment system around vats, tanks, or recovery circuits...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2012-02-21
This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111more » (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.« less
The Availability of Judicial Review Regarding Military Base Closures and Realignments
2005-06-30
held that the President is not subject to the APA, due to separation of powers principles.37 Base Closure Act Claims The Dalton Court distinguished...that the 1988 Base Closure Act violated the non-delegation doctrine and the separation of powers doctrine.53 However, the Base Closure Act has not yet been held unconstitutional by any federal appellate courts.
3718-F Alkali Metal Treatment and Storage Facility Closure Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less
100-D Ponds closure plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petersen, S.W.
1997-09-01
The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit ismore » clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure asmore » defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less
Managing Temporary School Closure Due to Environmental Hazard: Lessons from New Zealand
ERIC Educational Resources Information Center
Stuart, Kathy L.; Patterson, Lesley G.; Johnston, David M.; Peace, Robin
2013-01-01
The February 2011 Canterbury earthquake was a dramatic reminder of the need for schools to have emergency management plans in place. A number of other disaster and hazard events have historically caused New Zealand schools to close temporarily, and often within a short time frame. At such times principals must act decisively and communicate…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-13
... DEPARTMENT OF DEFENSE Department of the Army Record of Decision (ROD) for the Base Closure and... decision on how to implement property disposal in accordance with the Defense Base Closure and Realignment Act of 1990 (the Base Closure Act), Public Law 101-510, as amended, following the closure of Fort...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mathews, S.
This document addresses the interim status closure of the HE Open Bum Treatment Facility, as detailed by Title 22, Division 4.5, Chapter 15, Article 7 of the Califonia Code of Regulations (CCR) and by Title 40, Code of Federal Regulations (CFR) Part 265, Subpart G, ``Closure and Post Closure.`` The Closure Plan (Chapter 1) and the Post- Closure Plan (Chapter 2) address the concept of long-term hazard elimination. The Closure Plan provides for capping and grading the HE Open Bum Treatment Facility and revegetating the immediate area in accordance with applicable requirements. The Closure Plan also reflects careful consideration ofmore » site location and topography, geologic and hydrologic factors, climate, cover characteristics, type and amount of wastes, and the potential for contaminant migration. The Post-Closure Plan is designed to allow LLNL to monitor the movement, if any, of pollutants from the treatment area. In addition, quarterly inspections will ensure that all surfaces of the closed facility, including the cover and diversion ditches, remain in good repair, thus precluding the potential for contaminant migration.« less
40 CFR 264.258 - Closure and post-closure care.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Waste Piles § 264.258 Closure and post-closure care. (a) At closure, the owner or operator must remove... that apply to landfills (§ 264.310). (c)(1) The owner or operator of a waste pile that does not comply...(c) or § 264.251(b), must: (i) Include in the closure plan for the pile under § 264.112 both a plan...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Michael George
This field sampling plan describes sampling of the soil/liner of Lagoon 3 at the Central Facilities Area Sewage Treatment Plant. The lagoon is to be closed, and samples obtained from the soil/liner will provide information to determine if Lagoon 3 and the land application area can be closed in a manner that renders it safe to human health and the environment. Samples collected under this field sampling plan will be compared to Idaho National Laboratory background soil concentrations. If the concentrations of constituents of concern exceed the background level, they will be compared to Comprehensive Environmental Response, Compensation, and Liabilitymore » Act preliminary remediation goals and Resource Conservation and Recovery Act levels. If the concentrations of constituents of concern are lower than the background levels, Resource Conservation and Recovery Act levels, or the preliminary remediation goals, then Lagoon 3 and the land application area will be closed. If the Resource Conservation and Recovery Act levels and/or the Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals are exceeded, additional sampling and action may be required.« less
Planning the Transition to Long-Term Stewardship for the River Corridor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cearlock, C.S.; Lerch, J.A.; Sands, J.P.
2007-07-01
Long-term stewardship refers to all activities necessary to ensure protection of human health and the environment following completion of remediation, disposal, or stabilization of a site or a portion of a site. Efforts to establish the proposed approach and criteria to be met for long-term stewardship in the river corridor of the Hanford Site in Richland, Washington, are currently being established and a draft plan is expected to be completed in mid-2007 to facilitate planning for a smooth and seamless transition to long-term stewardship. Once the initial criteria have been established, supporting information will be gathered as the work proceeds.more » Near the end of cleanup actions under the River Corridor Closure Contract, these criteria will be finalized in a long-term stewardship plan that documents how the criteria have been met. In addition, the final long-term stewardship plan will also contain a proposed Finding of Suitability to Transfer in accordance with Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Section 120(h) [1]. This final long-term stewardship plan will provide the foundation for post-River Corridor Closure Contract and management activities in the river corridor pending actual property transfer from the U.S. Department of Energy. (authors)« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
... DEPARTMENT OF DEFENSE Department of the Army Record of Decision (ROD) for the Implementation of the Base Closure and Realignment (BRAC) 2005 Actions at Fort Monroe, VA AGENCY: Department of the Army... Defense Base Closure and Realignment Act of 1990 (the Base Closure Act), Public Law 101-510, as amended...
303-K Storage Facility closure plan. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-12-15
Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Codemore » (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-03
...-XC099 Harbor Porpoise Take Reduction Plan; Coastal Gulf of Maine Closure Area Established With a... Atmospheric Administration (NOAA), Commerce. ACTION: Establishment of the Coastal Gulf of Maine Closure Area... Service (NMFS) announces the establishment of the Coastal Gulf of Maine Closure Area under the Harbor...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Waste Injection Wells § 146.71 Closure. (a) Closure Plan. The owner or operator of a Class I hazardous waste injection well shall prepare, maintain, and comply with a plan for closure of the well that meets... of material to be used in plugging; (iv) The method of placement of the plugs; (v) Any proposed test...
Slonecker, E. Terrence; Fisher, Gary B.
2009-01-01
This project is a research collaboration between the U.S. Environmental Protection Agency (EPA) Office of Inspector General (OIG) and the U.S. Geological Survey (USGS) Eastern Geographic Science Center (EGSC), for the purpose of evaluating the utility of hyperspectral remote sensing technology for post-closure monitoring of residual contamination at delisted and closed hazardous waste sites as defined under the Comprehensive Environmental Response Compensation and Liability Act [CERCLA (also known as 'Superfund')] of 1980 and the Superfund Amendments and Reauthorization Act (SARA) of 1986.
Potter, Margaret A; Brown, Shawn T; Cooley, Phillip C; Sweeney, Patricia M; Hershey, Tina B; Gleason, Sherrianne M; Lee, Bruce Y; Keane, Christopher R; Grefenstette, John; Burke, Donald S
2012-11-14
States' pandemic influenza plans and school closure statutes are intended to guide state and local officials, but most faced a great deal of uncertainty during the 2009 influenza H1N1 epidemic. Questions remained about whether, when, and for how long to close schools and about which agencies and officials had legal authority over school closures. This study began with analysis of states' school-closure statutes and pandemic influenza plans to identify the variations among them. An agent-based model of one state was used to represent as constants a population's demographics, commuting patterns, work and school attendance, and community mixing patterns while repeated simulations explored the effects of variations in school closure authority, duration, closure thresholds, and reopening criteria. The results show no basis on which to justify statewide rather than school-specific or community-specific authority for school closures. Nor do these simulations offer evidence to require school closures promptly at the earliest stage of an epidemic. More important are criteria based on monitoring of local case incidence and on authority to sustain closure periods sufficiently to achieve epidemic mitigation. This agent-based simulation suggests several ways to improve statutes and influenza plans. First, school closure should remain available to state and local authorities as an influenza mitigation strategy. Second, influenza plans need not necessarily specify the threshold for school closures but should clearly define provisions for early and ongoing local monitoring. Finally, school closure authority may be exercised at the statewide or local level, so long as decisions are informed by monitoring incidence in local communities and schools.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Closure Report provides documentation of the activities conducted during the Resource Conservation and Recovery Act (RCRA) closure of the Bitcutter and Postshot Containment Shops Injection Wells located in Area 2 of the Nevada Test Site (NTS), Oak Spring Quadrangle (USGS, 1986), Township 10 South, Range 53 East, Nye County, Nevada. This report discusses the Bitcutter Shop Inside Injection Well (CAU 90-A) closure-in-place and the Bitcutter Shop Outside Injection Well (CAU 90-B) and Postshot Containment Shop Injection Well (CAU 90-C) clean closures. This Closure Report provides background information about the unit, the results of the characterization activities and actions conductedmore » to determine the closure design. It also provides a discussion of the drainage analysis, preliminary closure activities, final closure activities, waste management activities, and the Post-Closure Care requirements.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
1996-07-31
This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the closure of 51 high-level radioactive waste tanks and tank farm ancillary equipment (including transfer lines, evaporators, filters, pumps, etc) at the Savannah River Site (SRS) located near Aiken, South Carolina. The waste tanks are located in the F- and H-Areas of SRS and vary in capacity from 2,839,059 liters (750,000 gallons) to 4,921,035 liters (1,300,000 gallons). These in-ground tanks are surrounded by soil to provide shielding. The F- and H-Area High-Level Waste Tanks are operated under the authoritymore » of Industrial Wastewater Permits No.17,424-IW; No.14520, and No.14338 issued by the South Carolina Department of Health and Environmental Control (SCDHEC). In accordance with the Permit requirements, DOE has prepared a Closure Plan (DOE, 1996) and submitted it to SCDHEC for approval. The Closure Plan identifies all applicable or relevant and appropriate regulations, statutes, and DOE Orders for closing systems operated under the Industrial Wastewater Permits. When approved by SCDHEC, the Closure Plan will present the regulatory process for closing all of the F- and H-Area High Level Waste Tanks. The Closure Plan establishes performance objectives or criteria to be met prior to closing any tank, group of tanks, or ancillary tank farm equipment. The proposed action is to remove the residual wastes from the tanks and to fill the tanks with a material to prevent future collapse and bind up residual waste, to lower human health risks, and to increase safety in and around the tanks. If required, an engineered cap consisting of clay, backfill (soil), and vegetation as the final layer to prevent erosion would be applied over the tanks. The selection of tank system closure method will be evaluated against the following Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) criteria described in 40 CFR 300.430(e)(9): ( 1) overall protection of human health and the environment; (2) compliance with applicable or relevant and appropriated requirement: (ARARs); (3) long-term effectiveness and permanence; (4) reduction of toxicity, mobility, or volume through treatment; (5) short-term effectiveness; (6) implementability; (7) cost; (8) state acceptable; and (9) community acceptance. Closure of each tank involves two separate operations after bulk waste removal has been accomplished: (1) cleaning of the tank (i.e., removing the residual contaminants), and (2) the actual closure or filling of the tank with an inert material, (e.g., grout). This process would continue until all the tanks and ancillary equipment and systems have been closed. This is expected to be about year 2028 for Type I, II, and IV tanks and associated systems. Subsequent to that, Type III tanks and systems will be closed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-05-01
This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with themore » monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.« less
Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shannon Parsons
1999-03-01
The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973more » to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.« less
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...
Bankson, Daniel D; Heim, Joseph A
2014-01-01
To optimize transportation processes, we present herein a contingency plan that coordinates interim measures used to ensure continued and timely services when climate based events might cause an interruption of the usual specimen transportation processes. As an example, we outline the implementation and effectiveness of a contingency plan for network laboratory courier automobile transportation during times of mountain pass highway closure. Data available from an approximately 3-year period from October 10, 2010 through August 29, 2013 revealed a total of 690 complete closures in the eastbound or westbound lanes of the Interstate-90 highway in the Snoqualmie Pass area in the state of Washington. Despite the frequency of closures, the Washington State Department of Transportation was effective in limiting the duration of closures. Road closures of less than 1 hour accounted for 58.7% of the total closures. No recorded closures prevented dispatched couriers from completing a prescheduled Snoqualmie Pass route. We identified no delays as being clinically significant, despite that there were 5 instances of delays greater than 4 hours. We implemented a contingency plan of aiding courier logistics during all times of pass closure. The plan includes an easy to interpret Condition Dashboard as a status indicator and a Decision Tree that references and summarizes information. Overall, the contingency plan allows for an objective, robust, proactive decision support system that has enabled operational flexibility and has contributed to continued safe, on-time specimen transportation; clients and courier and reference laboratory staff have appreciated these features and associated outcomes. Copyright© by the American Society for Clinical Pathology (ASCP).
300 Area waste acid treatment system closure plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
LUKE, S.N.
1999-05-17
The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to themore » General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
2007-09-01
This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less
Base Closure and Realignment Act (BRAC) Cleanup Plan, Sacramento Army Depot, Sacramento, California
1995-10-01
and remedial actions ( RAs ) presented in this document are believed to be accurate and have been reviewed by the regulatory agencies. However, this...of items to be competed, a time-phased schedule, and source selection criteria. The competition will begin as soon as possible. The Communications...allowed to be emitted into the region’s air from all permitted sources . If new sources are sited within these non-attainment areas, they cannot emit more
Land use-based landscape planning and restoration in mine closure areas.
Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke
2011-05-01
Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
...: (i) Changes in operating plans or facility design affect the post-closure plan, or (ii) Events which... operation, or no later than 60 days after an unexpected event has occurred which has affected the post... operation, or no more than 60 days after an unexpected event has occurred which has affected the post...
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
...: (i) Changes in operating plans or facility design affect the post-closure plan, or (ii) Events which... operation, or no later than 60 days after an unexpected event has occurred which has affected the post... operation, or no more than 60 days after an unexpected event has occurred which has affected the post...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2013-09-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.
The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less
Transition and closeout of the Fernald Closure Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bilson, H.E.; Terry, T.; Reising, J.
The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less
300 Area waste acid treatment system closure plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-03-01
This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-13
... isolation in a deep geologic repository for spent fuel or high-level radioactive waste; (2) has had highly... in 10 CFR Part 61, Subpart C and pursuant to a State approved closure plan or State-issued permit; or... with the performance objectives of 10 CFR Part 61, Subpart C; pursuant to a State approved closure plan...
40 CFR 264.197 - Closure and post-closure care.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Section 264.197 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... as hazardous waste, unless § 261.3(d) of this chapter applies. The closure plan, closure activities...
ERIC Educational Resources Information Center
Gross, Rosalind L.; White, Harry E.
This publication describes a selected group of child-resistant closures used in packaging five categories of medicine and household products. The material in the document was collected to train survey personnel to identify closures for a planned household study of the effectiveness of child-resistant packaging. The 39 closures described are of…
Hanford facility dangerous waste permit application, general information portion. Revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sonnichsen, J.C.
1997-08-21
For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).« less
43 CFR 3809.401 - Where do I file my plan of operations and what information must I include with it?
Code of Federal Regulations, 2011 CFR
2011-10-01
... would not result in unnecessary or undue degradation of public lands. (b) Your plan of operations must... BLM to determine that the plan of operations prevents unnecessary or undue degradation: (1) Operator... closure (including periods of seasonal closure) to prevent unnecessary or undue degradation. The interim...
40 CFR 265.112 - Closure plan; amendment of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... residues and contaminated containment system components, equipment, structures, and soils during partial... contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination necessary to satisfy the closure performance standard; and (5) A detailed...
40 CFR 264.112 - Closure plan; amendment of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... residues and contaminated containment system components, equipment, structures, and soils during partial... contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required to satisfy the closure performance standard; and (5) A detailed...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schultheisz, D.; Ward, L.
1994-04-01
This report presents the results of the Community Environmental Response Facilitation Act (CERFA) investigation conducted by Environmental Resources Management (ERM) at Fort George G. Meade (FGGM), a U.S. Government property selected for closure by the Base Realignment and Closure (BRAC) Commission. Under CERFA, Federal agencies are required to expeditiously identify real property that can be immediately reused and redeveloped. Satisfying this objective requires the identification of real property where no hazardous substances or petroleum products, regulated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), were stored for one year or more, known to have been released, or disposed.more » Fort George G. Meade, CERFA, Base closure, BRAC.« less
Association of land use and beach closure in the United ...
Swimming in natural waters (e.g., oceans, lakes, rivers) is one of most popular recreational activities in the United States. However, exposure to pathogens (e.g., Salmonella spp., Shigella spp., Cryptosporidium, Giardia, adenovirus, norovirus) in recreational waters can lead to a variety of adverse health outcomes. To protect public health and reduce the number of outbreaks associated with recreational waters, the BEACH Act was passed in 2000, which required beach regulators to develop a formal plan to assess beach water quality and to notify the public if recreational waters are unsafe. High levels of microorganisms in water often follow extreme weather events. Besides extreme weather events, the proximity of certain land uses to beaches may also have great influence on beach water quality. Microbial contaminants that lead to beach closures and human illness come mainly from land, either from discrete point sources or from diffuse non-point sources. It is expected that land use will have considerable influence on beach microbial water quality. However, to date, studies on impacts of land use on beach microbial contamination are rare, and few researchers are aware of the relationship between land use and beach closures.In this study, we analyzed beach closure data obtained from 2004 to 2013 for more than 500 beaches in the United States, and examined their associations with land use around beaches in 2006 and 2011. The results show that the number of beach clos
RMA Abandoned Well Closure Program. Final Task Plan, Version 3.0.
1989-05-01
20503. 1 . AGENCY USE ONLY (Leave blank) 2. REPORT DATE" 0 3. REPORT TYPE AND DATES COVERED _T 05/00/89 __________________ 4. TITLE AND SUBTITLE S...AQUIFERS. THE SCOPE OF WORK INCLUDES: 1 . COMPILATION OF A WELL INVENTORY AND DATABASE 2. FIELD LOCATION OF WELLS 3. CLEANING AND CLOSURE OF...APPROXIMATELY 350 WELT- 4. DOCUMENTATION OF CLOSURE ACTIVITIES. SECTIONS OF THIS TASK PLAN DETAIL-INFORMATION ON: 1 . ABANDONED WELL IDENTIFICATION AND LOCATION
Monitoring calculation of closure change of Extradosed Cable-stayed Bridge
NASA Astrophysics Data System (ADS)
Shi, Jing Xian; Ran, Zhi Hong
2018-06-01
During the construction of extradosed cable-stayed bridge in Yunnan province, China, the construction unit has made certain changes in the construction process of the closure section due to environmental restrictions: remove the hanging basket after the closure, the sling shall not be provided in closure section, the function of the sling is realized by the hanging basket on the 16th beam. In case of this change, the bridge has been constructed to section 15th. In order to ensure the smooth and orderly progress of each stage in the closure phase, this article is arranged according to the construction plan, appropriate adjustment of related procedures, checking the bridge safety at all stages of construction, the stress and force of the main girder are compared to ensure the safety of the construction after closure changes. Adjust the height of the beam of the 16th and 17th to adapt the new construction plan, and the bridge closure smoothly.
40 CFR 258.72 - Financial assurance for post-closure care.
Code of Federal Regulations, 2011 CFR
2011-07-01
... care. 258.72 Section 258.72 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... dollars, of the cost of hiring a third party to conduct post-closure care for the MSWLF unit in compliance with the post-closure plan developed under § 258.61 of this part. The post-closure cost estimate used...
29 CFR 2701.2 - Open meetings policy; closure of meetings.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 9 2010-07-01 2010-07-01 false Open meetings policy; closure of meetings. 2701.2 Section... GOVERNMENT IN THE SUNSHINE ACT REGULATIONS § 2701.2 Open meetings policy; closure of meetings. (a) Policy. Commission meetings will generally be open to public observation, including meetings concerning the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 1 2010-07-01 2010-07-01 false Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993. 174.15 Section 174.15 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE CLOSURES AND REALIGNMENT REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 1 2013-07-01 2013-07-01 false Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993. 174.15 Section 174.15 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE CLOSURES AND REALIGNMENT REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 1 2011-07-01 2011-07-01 false Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993. 174.15 Section 174.15 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE CLOSURES AND REALIGNMENT REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 1 2014-07-01 2014-07-01 false Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993. 174.15 Section 174.15 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE CLOSURES AND REALIGNMENT REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 1 2012-07-01 2012-07-01 false Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993. 174.15 Section 174.15 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE CLOSURES AND REALIGNMENT REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT...
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA
2006-09-01
This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.
40 CFR 265.112 - Closure plan; amendment of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND.... By May 19, 1981, or by six months after the effective date of the rule that first subjects a facility... description of other activities necessary during the partial and final closure periods to ensure that all...
76 FR 70878 - Revitalizing Base Closure Communities and Addressing Impacts of Realignment
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-16
... base closure process to conform to the amendment to the Defense Base Closure and Realignment Act of... departments to expedite the EDC process. Closed military bases represent a potential engine of economic... purposes of establishing EDC terms and conditions. It also eliminates the need to establish a process by...
No-migration variance petition. Appendices C--J: Volume 5, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-03-01
Volume V contains the appendices for: closure and post-closure plans; RCRA ground water monitoring waver; Waste Isolation Division Quality Program Manual; water quality sampling plan; WIPP Environmental Procedures Manual; sample handling and laboratory procedures; data analysis; and Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tuor, N. R.; Schubert, A. L.
2002-02-26
Safely accelerating the closure of Rocky Flats to 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy, Kaiser-Hill and its team of subcontractors, the site's employees, and taxpayers across the country. On June 30, 2000, Kaiser-Hill (KH) submitted to the Department of Energy (DOE), KH's plan to achieve closure of Rocky Flats by December 15, 2006, for a remaining cost of $3.96 billion (February 1, 2000, to December 15, 2006). The Closure Project Baseline (CPB) is the detailed project plan for accomplishing this ambitious closure goal.more » This paper will provide a status report on the progress being made toward the closure goal. This paper will: provide a summary of the closure contract completion criteria; give the current cost and schedule variance of the project and the status of key activities; detail important accomplishments of the past year; and discuss the challenges ahead.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trujillo, P.A.; Anderson, K.D.
2007-07-01
This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological and chemical closure under a performance based contract vehicle and the challenges encountered while reaching this goal. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Navarro Nevada Environmental Services
The closure report for CAU 91 has no Use Restriction Form or drawing/map included in the document to describe the use restricted area, however, Section 3.3.3 states that the site will be fenced and signage placed indicating the area as a Resource Conservation and Recovery Act (RCRA) Unit. The drawing that was placed in the FFACO indicating the use restricted area lists the coordinates for the RCRA Unit in Nevada State Plan Coordinates - North American Datum of 1983. In the ensuing years the reporting of coordinates has been standardized so that all coordinates are reported in the same manner,more » which is: NAD 27 UTM Zone 11 N, meters. This Errata Sheet updates the coordinate reporting to the currently accepted method and includes an aerial photo showing the RCRA Unit with the coordinates listed showing the use restricted area.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Strachan, C.L.; Raabe, K.L.
1997-12-31
In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designedmore » for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-08-31
This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information andmore » process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... that the waste in the FTF: (1) Does not require permanent isolation in a deep geologic repository for... pursuant to a State approved closure plan or State-issued permit; or (3)(B) exceeds concentration limits... 10 CFR part 61, Subpart C; pursuant to a State-approved closure plan or State-issued [[Page 20376...
Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bamberger, Judith A; Burks, Barry L; Quigley, Keith D
2001-09-28
The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. Thismore » review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.« less
School Closings in Philadelphia
ERIC Educational Resources Information Center
Jack, James; Sludden, John
2013-01-01
In 2012, the School District of Philadelphia closed six schools. In 2013, it closed 24. The closure of 30 schools has occurred amid a financial crisis, headlined by the district's $1.35 billion deficit. School closures are one piece of the district's plan to cut expenditures and close its budget gap. The closures are also intended to make…
ERIC Educational Resources Information Center
Tsai, Victoria; Khan, Nomana M.; Shi, Jianrong; Rainey, Jeanette; Gao, Hongjiang; Zheteyeva, Yenlik
2017-01-01
Background: School closure is one of the primary measures considered during severe influenza pandemics and other emergencies. However, prolonged school closures may cause unintended adverse consequences to schools, students, and their families. A better understanding of these consequences will inform prepandemic planning, and help public health…
RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Annette L. Schafer
2012-06-01
A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in themore » following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.« less
Vetter, Diana; Raptis, Dimitri Aristotle; Giama, Mira; Hosa, Hanna; Muller, Markus K; Nocito, Antonio; Schiesser, Marc; Moos, Rudolf; Bueter, Marco
2017-12-01
The aims of the present study were to assess whether planned secondary wound closure at the insertion site of the circular stapler reduces wound infection rate and postoperative morbidity after laparoscopic Roux-en-Y gastric bypass (RYGB) and to identify independent predictive factors increasing the risk for wound infections after RYGB. This paper is a retrospective single-center analysis of a prospectively collected database of 1400 patients undergoing RYGB surgery in circular technique between June 2000 and June 2016. Planned secondary wound closure at the circular stapler introduction site was performed at postoperative day 3 in 291 (20.8%) consecutive patients and compared to a historical control of 1109 (79.2%) consecutive patients with primary wound closure. Independent predictive factors for wound infection were assessed by multivariable analysis. Secondary wound closure significantly decreased wound infection rate from 9.3% (103/1109) to 1% (3/291) (p < 0.001) leading to a shorter hospital stay (mean 9 (SD8) vs. 7 days (SD2), p < 0.001), lower costs (p = 0.039), and reduced postoperative morbidity (mean 90-day Comprehensive Complication Index (CCI) 7.4 (SD14.0) vs. 5.1 (SD11.1) p = 0.008) when compared to primary wound closure. Primary wound closure, dyslipidemia, and preoperative gastritis were independent predictive risk factors for developing wound infections both in the univariate (p < 0.001; p = 0.048; p = 0.003) and multivariable analysis (p < 0.001; p = 0.040; p = 0.012). Further, on multivariable analysis, the female gender was a predictive factor (p = 0.034) for wound infection development. Secondary wound closure at the circular stapler introduction site in laparoscopic RYGB significantly reduces the overall wound infection rate as well as postoperative morbidity, costs, and hospital stay when compared to primary wound closure.
Feasibility of lane closures using probe data.
DOT National Transportation Integrated Search
2017-04-01
To develop an adequate traffic operations management and congestion mitigation plan for every roadway : maintenance and construction project requiring lane closures, transportation agencies need accurate and : reliable estimates of traffic impacts as...
77 FR 67023 - Notice of Temporary Closure on Public Lands in Mesa County, CO
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-08
... soils in place. A temporary closure of public land to vehicle and foot traffic within the burned area is... germinating, hybrid annual seed and plans to disperse native species seeds in the affected area. The dispersed... Pine Ridge Fire Temporary Closure Area by any means of transportation, including by vehicle or foot...
Thinning guidelines from crown area relationships for young hardwood plantations
Jeffrey W. Stringer; Luke Cecil
2010-01-01
Crown closure in hardwood plantations signals the first opportunity to apply density control treatments such as thinning or release. The proper timing of these treatments is a function of stocking levels and is generally scheduled within several years after initial crown closure. Predicting crown closure for a plantation provides practitioners with the ability to plan...
Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, Jenny; Lyles, Brad; Cooper, Clay
Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less
Williams, S. Jeffress; Foley, Mary K.
2007-01-01
4. Economic costs and benefits of artificial closure. This report for breach management presents protocols which specify when breach closures within the FIIS might be desirable and necessary, as well as provides recommendations for structural breach closure engineering operations which are indented to minimize negative impacts to the natural wilderness values and cultural resources within the FIIS, particularly the Otis Pike Wilderness Area. The goal of the plan is to strike a balance between protecting natural resources and allowing natural processes to operate and avoiding loss of life and excessive property damage.
Household responses to school closure resulting from outbreak of influenza B, North Carolina.
Johnson, April J; Moore, Zack S; Edelson, Paul J; Kinnane, Lynda; Davies, Megan; Shay, David K; Balish, Amanda; McCarron, Meg; Blanton, Lenee; Finelli, Lyn; Averhoff, Francisco; Bresee, Joseph; Engel, Jeffrey; Fiore, Anthony
2008-07-01
School closure is a proposed strategy for reducing influenza transmission during a pandemic. Few studies have assessed how families respond to closures, or whether other interactions during closure could reduce this strategy's effect. Questionnaires were administered to 220 households (438 adults and 355 children) with school-age children in a North Carolina county during an influenza B virus outbreak that resulted in school closure. Closure was considered appropriate by 201 (91%) households. No adults missed work to solely provide childcare, and only 22 (10%) households required special childcare arrangements; 2 households incurred additional costs. Eighty-nine percent of children visited at least 1 public location during the closure despite county recommendations to avoid large gatherings. Although behavior and attitudes might differ during a pandemic, these results suggest short-term closure did not cause substantial hardship for parents. Pandemic planning guidance should address the potential for transmission in public areas during school closure.
Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.; Lantow, Tiffany A.
This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.« less
C. elegans epidermal wounding induces a mitochondrial ROS burst that promotes wound repair
Xu, Suhong; Chisholm, Andrew D.
2014-01-01
SUMMARY Reactive oxygen species (ROS) such as hydrogen peroxide are generated at wound sites and act as long-range signals in wound healing. The roles of other ROS in wound repair are little explored. Here we reveal a cytoprotective role for mitochondrial ROS (mtROS) in C. elegans skin wound healing. We show that skin wounding causes local production of mtROS superoxide at the wound site. Inhibition of mtROS levels by mitochondrial superoxide-specific antioxidants blocks actin-based wound closure, whereas elevation of mtROS promotes wound closure and enhances survival of mutant animals defective in wound healing. mtROS act downstream of wound-triggered Ca2+ influx. We find that the Mitochondrial Calcium Uniporter MCU-1 is essential for rapid mitochondrial Ca2+ uptake and mtROS production after wounding. mtROS can promote wound closure by local inhibition of Rho GTPase activity via a redox-sensitive motif. These findings delineate a pathway acting via mtROS that promotes cytoskeletal responses in wound healing. PMID:25313960
300 Area process trench sediment analysis report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zimmerman, M.G.; Kossik, C.D.
1987-12-01
This report describes the results of a sampling program for the sediments underlying the Process Trenches serving the 300 Area on the Hanford reservation. These Process Trenches were the subject of a Closure Plan submitted to the Washington State Department of Ecology and to the US Environmental Protection Agency in lieu of a Part B permit application on November 8, 1985. The closure plan described a proposed sampling plan for the underlying sediments and potential remedial actions to be determined by the sample analyses results. The results and proposed remedial action plan are presented and discussed in this report. 50more » refs., 6 figs., 8 tabs.« less
Reactor refueling containment system
Gillett, J.E.; Meuschke, R.E.
1995-05-02
A method of refueling a nuclear reactor is disclosed whereby the drive mechanism is disengaged and removed by activating a jacking mechanism that raises the closure head. The area between the barrier plate and closure head is exhausted through the closure head penetrations. The closure head, upper drive mechanism, and bellows seal are lifted away and transported to a safe area. The barrier plate acts as the primary boundary and each drive and control rod penetration has an elastomer seal preventing excessive tritium gases from escaping. The individual instrumentation plugs are disengaged allowing the corresponding fuel assembly to be sealed and replaced. 2 figs.
Reactor refueling containment system
Gillett, James E.; Meuschke, Robert E.
1995-01-01
A method of refueling a nuclear reactor whereby the drive mechanism is disengaged and removed by activating a jacking mechanism that raises the closure head. The area between the barrier plate and closure head is exhausted through the closure head penetrations. The closure head, upper drive mechanism, and bellows seal are lifted away and transported to a safe area. The barrier plate acts as the primary boundary and each drive and control rod penetration has an elastomer seal preventing excessive tritium gases from escaping. The individual instrumentation plugs are disengaged allowing the corresponding fuel assembly to be sealed and replaced.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick K.
2015-03-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigationmore » to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF); and Confirm the preferred closure option is sufficient to protect human health and the environment.« less
3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant tomore » the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dave Madsen
This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less
USER'S GUIDE TO CLOSURE EVALUATION SYSTEM: CES BETA-TEST VERSION 1.0
The Closure Evaluation System (CES) is a decision support tool, developed by the U.S. EPA's Risk Reduction Engineering Laboratory, to assist reviewers and preparers of Resource Conservation and Recovery Act (RCRA) Part B permit applications. CES is designed to serve as a checklis...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-30
... closures on the U.S. west coast during El Ni[ntilde]o events was incorrect; those closures are implemented from June 1 through August 31 when NMFS has forecasted or announced the occurrence of an El Ni[ntilde]o...
Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2005-03-02
This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soilmore » at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for former waste management units, legacy contamination source areas and distribution of contamination in soils, and environmental infrastructure (e.g., caps, monitoring systems, etc.) that is in place or planned in association with RAs. (3) Regulatory considerations and processes for management and disposition of waste soil upon generation, including regulatory drivers, best management practices (BMPs), waste determination protocols, waste acceptance criteria, and existing waste management procedures and BMPs for Y-12. This Soil Management Plan provides information to project planners to better coordinate their activities with other organizations and programs with a vested interest in soil disturbance activities at Y-12. The information allows project managers and maintenance personnel to evaluate and anticipate potential contaminant levels that may be present at a proposed soil disturbance site prior to commencement of activities and allows a more accurate assessment of potential waste management requirements.« less
9 CFR 381.301 - Containers and closures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... examination should be based upon a statistical sampling plan. (2) All empty containers, closures, and flexible... the container plant records are made available to Program employees. Additional teardown examinations...
9 CFR 381.301 - Containers and closures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... examination should be based upon a statistical sampling plan. (2) All empty containers, closures, and flexible... the container plant records are made available to Program employees. Additional teardown examinations...
9 CFR 381.301 - Containers and closures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... examination should be based upon a statistical sampling plan. (2) All empty containers, closures, and flexible... the container plant records are made available to Program employees. Additional teardown examinations...
9 CFR 381.301 - Containers and closures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... examination should be based upon a statistical sampling plan. (2) All empty containers, closures, and flexible... the container plant records are made available to Program employees. Additional teardown examinations...
Integrated capabilities in heavy vehicles : human factors research needs
DOT National Transportation Integrated Search
2003-10-09
The Full Road Closure method uses facility closure and total traffic diversion, which may be for one direction or bi-directional traffic flow, to accelerate construction and reduce the negative impacts of work zones. With good planning, interagency c...
1992-04-10
Devens - Fort Huachuca FY 91 FY 95 Fort McClellan FY 92 FY 96 Fort Chaffee FY 92 FY 97 Cameron Station FY 91 FY 95 53 Stand Alone Housing Sites FY 90 FY...Army, Headquarters Forces Command, &as Realianment and Closure Implementation Plan - Fort Devens Closure Package, Implementation Plan, Fort McPherson, GA...Classification) RAC , What Will It Cost? 12. PERSONAL AUTHOR(S) TLIN, Robert B. LTC, USA 13. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (Year
CEMENTITIOUS GROUT FOR CLOSING SRS HIGH LEVEL WASTE TANKS - #12315
DOE Office of Scientific and Technical Information (OSTI.GOV)
Langton, C.; Burns, H.; Stefanko, D.
2012-01-10
In 1997, the first two United States Department of Energy (US DOE) high level waste tanks (Tanks 17-F and 20-F: Type IV, single shell tanks) were taken out of service (permanently closed) at the Savannah River Site (SRS). In 2012, the DOE plans to remove from service two additional Savannah River Site (SRS) Type IV high-level waste tanks, Tanks 18-F and 19-F. These tanks were constructed in the late 1950's and received low-heat waste and do not contain cooling coils. Operational closure of Tanks 18-F and 19-F is intended to be consistent with the applicable requirements of the Resource Conservationmore » and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and will be performed in accordance with South Carolina Department of Health and Environmental Control (SCDHEC). The closure will physically stabilize two 4.92E+04 cubic meter (1.3 E+06 gallon) carbon steel tanks and isolate and stabilize any residual contaminants left in the tanks. The closure will also fill, physically stabilize and isolate ancillary equipment abandoned in the tanks. A Performance Assessment (PA) has been developed to assess the long-term fate and transport of residual contamination in the environment resulting from the operational closure of the F-Area Tank Farm (FTF) waste tanks. Next generation flowable, zero-bleed cementitious grouts were designed, tested, and specified for closing Tanks 18-F and 19-F and for filling the abandoned equipment. Fill requirements were developed for both the tank and equipment grouts. All grout formulations were required to be alkaline with a pH of 12.4 and chemically reduction potential (Eh) of -200 to -400 to stabilize selected potential contaminants of concern. This was achieved by including Portland cement and Grade 100 slag in the mixes, respectively. Ingredients and proportions of cementitious reagents were selected and adjusted, respectively, to support the mass placement strategy developed by closure operations. Subsequent down selection was based on compressive strength and saturated hydraulic conductivity results. Fresh slurry property results were used as the first level of screening. A high range water reducing admixture and a viscosity modifying admixture were used to adjust slurry properties to achieve flowable grouts. Adiabatic calorimeter results were used as the second level screening. The third level of screening was used to design mixes that were consistent with the fill material parameters used in the F-Tank Farm Performance Assessment which was developed to assess the long-term fate and transport of residual contamination in the environment resulting from the operational closures.« less
Department of Defense Base Reuse Implementation Manual, DOD 4165.66-M
1997-12-01
applications? SPECIAL CONSIDERATION In the case of representatives of the homeless whose applications have been approved by HHS under Title V of the...2) In the case of installations approved for closure under a base closure law before the date of the enactment of this Act, not later than 15 days...realignment, as the case may be, of such installation under the applicable base closure law expires. (3) The term "redevelopment authority", in the case
This asset includes information related to Cleanups at Federal Facilities. Information is provided about contaminated federal facility sites in specific communities, with access to technical fact sheets and tools and resources to help government agencies and their contractors fulfill cleanup obligations. EPA's federal facility information is easily accessible to ensure effective stakeholder involvement and accountability at federal facilities.Multiple federal statutes establish requirements for EPA and other federal agencies to protect health and the human environment through cleanups at Federal Facilities, including the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980, which was amended by the Superfund Amendments and Reauthorization Act (SARA) in 1986; the Defense Authorization Amendments and Base Realignment and Closure Acts (BRAC) of 1998 and the Defense Base Closure and Realignment Act of 1990; and the Resource Conservation and Recovery Act (RCRA), as amended by the Hazardous and Solid Waste Amendments of 1984 (HS WA) including Subtitle C (hazardous waste), Subtitle D (solid waste), Subtitle I (underground storage tanks), and Subtitle J (Medical Waste Tracking Act of 1988).
Federal Agency Hazardous Waste Compliance Docket
List of the Federal Agency Hazardous Waste Compliance Docket Facilities comprised of four lists: National Priorities List (NPL), Non-National Priorities List, Base Realignment and Closure Act (BRAC), and Resource Conservation and Recovery Act (RCRA).
Code of Federal Regulations, 2011 CFR
2011-10-01
... recreational sector-specific ACTs shall be less than or equal to the fishery level ACL. The Bluefish Monitoring... ACTs in conjunction with any ACL performance review, as outlined in § 648.160(b)(1) through (3). ...
40 CFR 265.113 - Closure; time allowed for closure.
Code of Federal Regulations, 2010 CFR
2010-07-01
... includes an amended waste analysis plan, ground-water monitoring and response program, human exposure....113 Section 265.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...
Feasibility of lane closures using probe data : technical brief.
DOT National Transportation Integrated Search
2017-04-01
This study developed an on-line system analysis tool called the Work Zone Interactive : Management Application - Planning (WIMAP-P), an easy-to-use and easy-to-learn tool for : predicting the traffic impact caused by work zone lane closures on freewa...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-01
... are operating without a yellowtail flounder closure cap for the first time. The scallop fleet continues to use a proactive, near real-time system for avoiding yellowtail flounder; however, the negative... AM for GB yellowtail flounder implements time and area closures based on the magnitude of the overage...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-26
... for Iranian Financial Sanctions Regulations Report on Closure by U.S. Financial Institutions of... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the Office of Foreign Assets... Financial Sanctions Regulations Report on Closure by U.S. Financial [[Page 38142
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-01-01
The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.
21 CFR 177.1210 - Closures with sealing gaskets for food containers.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 21 Food and Drugs 3 2014-04-01 2014-04-01 false Closures with sealing gaskets for food containers... paragraph (b)(3) (v), (xxxi), and (xxxii) of that section, and from other optional substances, including the... provisions of a prior sanction or approval within the meaning of section 201(s) of the act. (3) Substances...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-03
..., as amended (``the Act'').\\1\\ \\1\\ Due to the extended closure of the Government between February 5 and... Government Closure During the Recent Snowstorm, available at http://ia.ita.doc.gov/download/administrative... Conversion, Inc., Rotary Drilling Tools, TMK IPSCO, and the United Steel, Paper and Forestry, Rubber...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2006-09-01
In 2001, the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA/NSO) remediated six areas associated with Amchitka mud pit release sites located on Amchitka Island, Alaska. This included the construction of seven closure caps. To ensure the integrity and effectiveness of remedial action, the mud pit sites are to be inspected every five years as part of DOE's long-term monitoring and surveillance program. In August of 2006, the closure caps were inspected in accordance with the ''Post-Closure Monitoring and Inspection Plan for Amchitka Island Mud Pit Release Sites'' (Rev. 0, November 2005). This post-closure monitoring report provides themore » 2006 cap inspection results.« less
Brown, Jacob D; Dutta, Sunit; Bharti, Kapil; Bonner, Robert F; Munson, Peter J; Dawid, Igor B; Akhtar, Amana L; Onojafe, Ighovie F; Alur, Ramakrishna P; Gross, Jeffrey M; Hejtmancik, J Fielding; Jiao, Xiaodong; Chan, Wai-Yee; Brooks, Brian P
2009-02-03
The gene networks underlying closure of the optic fissure during vertebrate eye development are poorly understood. Here, we profile global gene expression during optic fissure closure using laser capture microdissected (LCM) tissue from the margins of the fissure. From these data, we identify a unique role for the C(2)H(2) zinc finger proteins Nlz1 and Nlz2 in normal fissure closure. Gene knockdown of nlz1 and/or nlz2 in zebrafish leads to a failure of the optic fissure to close, a phenotype which closely resembles that seen in human uveal coloboma. We also identify misregulation of pax2 in the developing eye of morphant fish, suggesting that Nlz1 and Nlz2 act upstream of the Pax2 pathway in directing proper closure of the optic fissure.
21 CFR 177.1210 - Closures with sealing gaskets for food containers.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 21 Food and Drugs 3 2012-04-01 2012-04-01 false Closures with sealing gaskets for food containers... identified in § 175.300(b) of this chapter, with the exception of paragraph (b)(3) (v), (xxxi), and (xxxii... sanction or approval within the meaning of section 201(s) of the act. (3) Substances that are the subject...
21 CFR 177.1210 - Closures with sealing gaskets for food containers.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 21 Food and Drugs 3 2013-04-01 2013-04-01 false Closures with sealing gaskets for food containers... identified in § 175.300(b) of this chapter, with the exception of paragraph (b)(3) (v), (xxxi), and (xxxii... sanction or approval within the meaning of section 201(s) of the act. (3) Substances that are the subject...
Closedure - Mine Closure Technologies Resource
NASA Astrophysics Data System (ADS)
Kauppila, Päivi; Kauppila, Tommi; Pasanen, Antti; Backnäs, Soile; Liisa Räisänen, Marja; Turunen, Kaisa; Karlsson, Teemu; Solismaa, Lauri; Hentinen, Kimmo
2015-04-01
Closure of mining operations is an essential part of the development of eco-efficient mining and the Green Mining concept in Finland to reduce the environmental footprint of mining. Closedure is a 2-year joint research project between Geological Survey of Finland and Technical Research Centre of Finland that aims at developing accessible tools and resources for planning, executing and monitoring mine closure. The main outcome of the Closedure project is an updatable wiki technology-based internet platform (http://mineclosure.gtk.fi) in which comprehensive guidance on the mine closure is provided and main methods and technologies related to mine closure are evaluated. Closedure also provides new data on the key issues of mine closure, such as performance of passive water treatment in Finland, applicability of test methods for evaluating cover structures for mining wastes, prediction of water effluents from mine wastes, and isotopic and geophysical methods to recognize contaminant transport paths in crystalline bedrock.
SEAL FOR HIGH SPEED CENTRIFUGE
Skarstrom, C.W.
1957-12-17
A seal is described for a high speed centrifuge wherein the centrifugal force of rotation acts on the gasket to form a tight seal. The cylindrical rotating bowl of the centrifuge contains a closure member resting on a shoulder in the bowl wall having a lower surface containing bands of gasket material, parallel and adjacent to the cylinder wall. As the centrifuge speed increases, centrifugal force acts on the bands of gasket material forcing them in to a sealing contact against the cylinder wall. This arrangememt forms a simple and effective seal for high speed centrifuges, replacing more costly methods such as welding a closure in place.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Young, B.; Frye, C.
1994-04-01
This report presents the results of the Community Environmental Response Facilitation Act (CERFA) investigation conducted by The Earth Technology Corporation (TETC) at Alabama Army Ammunition Plant, a U.S. Government property selected for closure by the Base Realignment and Closure (BRAC) Commission. Under CERFA, Federal agencies are required to identify real property that can be immediately reused and redeveloped. Satisfying this objective requires the identification of real property where no hazardous substances or petroleum, products, regulated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), were stored for one year or more, known to have been released, or disposed. Themore » Alabama Army Ammunition Plant is a 2,187-acre site (more or less) located in Talladega County, Alabama, approximately 5 miles north of Childersburg, Alabama. The installation's primary mission was to manufacture explosives. Activities associated with the property that have environmental significance are the former manufacturing of explosives, the recycling of spent acids, and the disposal of wastes resulting from these operations. The facility is on U.S. Environmental Protection Agency's National Priorities List. Alabama Army Ammunition Plant, CERFA, Base closure, BRAC.« less
43 CFR 3809.201 - What should these agreements address?
Code of Federal Regulations, 2013 CFR
2013-10-01
.... Operations must not begin until BLM completes consultation or conferencing under the Endangered Species Act. ... whether Federally proposed or listed threatened or endangered species or their proposed or designated... Policy Act; performance standards; interim management of temporary closure; financial guarantees...
43 CFR 3809.201 - What should these agreements address?
Code of Federal Regulations, 2012 CFR
2012-10-01
.... Operations must not begin until BLM completes consultation or conferencing under the Endangered Species Act. ... whether Federally proposed or listed threatened or endangered species or their proposed or designated... Policy Act; performance standards; interim management of temporary closure; financial guarantees...
43 CFR 3809.201 - What should these agreements address?
Code of Federal Regulations, 2014 CFR
2014-10-01
.... Operations must not begin until BLM completes consultation or conferencing under the Endangered Species Act. ... whether Federally proposed or listed threatened or endangered species or their proposed or designated... Policy Act; performance standards; interim management of temporary closure; financial guarantees...
Knowing Where You're Going: Planning for Meaningful Course Closure
ERIC Educational Resources Information Center
Burgess-Van Aken, Barbara
2017-01-01
A literature review on approaches to a final course session reveals a dearth of attention to the issue. Options for last-day activities fall into three categories: professor-centered, activity-focused, and student-driven. Using the criterion that meaningful course closure calls for last-day activities that engage students in reflection not only…
Engineering study for closure of 209E facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brevick, C.H.; Heys, W.H.; Johnson, E.D.
1997-07-07
This document is an engineering study for evaluating alternatives to determine the most cost effective closure plan for the 209E Facility, Critical Mass Laboratory. This laboratory is located in the 200 East Area of the Hanford Site and contains a Critical Assembly Room and a Mix room were criticality experiments were once performed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1997-02-25
1.1 Purpose This Closure Report presents the information obtained from investigative actions performed to justify the decision for clean closure of CAU 430 through "No Further Action." The investigative actions were performed per the Streamlined Approach for Environmental Restoration Plan, CA UNO. 430: Buried Depleted Uranium Artille~ Round No. 1, Tonopah Test Range (DOE/NV, 1996a) (hereafter referred to as the SAFER Plan). The Buried DU Artillery Round No. 1 is located approximately 1.1 kilometers (km) (0.7 mile [mi]) south of Avenue 13 in the test area south of Area 9 (Figure 1-2). The site was thought to consist of amore » potentially unexploded W-79 Joint Test Assembly (JTA) test artillery projectile with high explosives (HE) and DU. The DU was substituted for Special Nuclear Material to prevent a nuclear explosion and yet retain the physical characteristics of uranium for ballistic and other mechanical tests. The projectile was reportedly buried in one pit, approximately 5 to 10 feet (ft) deep (Smith, 1993; Smith, 1996; Quas, 1996). The exact location of the burial pit is unknown; however, three disturbed areas (Sites A, B, and C) were identified through geophysical surveys, site visits, and employee interviews as possible locations of the test projectile (Figure 1-3). Results of the investigation are summarized within this Closure Report. Additional information about the site and investigation activities may be found in the SAFER Plan (DOE/NV, 1996a). 1.2 Scope The objectives of the SAFER Plan (DOE/NV, 1996a) activities were to prepare the site for closure through locating and identi~ing the projectile (Buried DU Artillery Round No. 1), destroying the projectile and any remaining components, collecting soil samples to detect residual contamination resulting from projectile destruction, and finally, remediating residual contamination.« less
216-B-3 expansion ponds closure plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-10-01
This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steammore » condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Public Laws designated more than 100 Department of Army facilities for closure and realignment. As a result, it became necessary to expedite the environmental investigation and cleanup process, as necessary, prior to the release and reuse of Army Base Realignment and Closure (BRAC) property. The BRAC environmental restoration program was established in 1989 with the first round (BRAC 88) of base closures and continued with subsequent rounds (BRAC 91, BRAC 93, etc.). As a result of the BRAC program, Fort Holabird Crime Records Center has been investigated to determine its environmental condition.
Troughs on Martian Ice Sheets: Analysis of Their Closure and Mass Balance
NASA Technical Reports Server (NTRS)
Fountain, A.; Kargel, J.; Lewis, K.; MacAyeal, D.; Pfeffer, T.; Zwally, J.
2000-01-01
At the Copenhagen workshop on Martian polar processes, Ralf Greve commented that the flow regime surrounding scarps and troughs of the Martian polar ice sheets cannot be modeled using traditional "plan view" ice-sheet models. Such models are inadequate because they typically use reduced equations that embody certain simplifications applicable only to terrestrial ice sheets where the upper ice sheet surface is smooth. In response to this suggestion, we have constructed a 2-dimensional, time dependent "side view" (two spatial dimensions: one horizontal, one vertical) model of scarp closure that is designed to overcome the difficulties described by Greve. The purpose of the model is to evaluate the scales of stress variation and styles of flow closure so as to estimate errors that may be encountered by "plan view" models. We show that there may be avenues whereby the complications associated with scarp closure can be overcome in "plan view" models through appropriate parameterizations of 3-dimensional effects. Following this, we apply the flow model to simulate the evolution of a typical scarp on the North Polar Cap of Mars. Our simulations investigate: (a) the role of "radiation trapping" (see our companion abstract) in creating and maintaining "spiral-like" scarps on the ice sheet, (b) the consequences of different flowlaws and ice compositions on scarp evolution and, in particular, scarp age, and (c) the role of dust and debris in scarp evolution.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, K.D.
2006-07-01
Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less
Final Closure Letter for Administrative Complaint Numbers 03R-07-R9, 10R-07-R9 and 01R-11R9
On 6-7-2017, ECRCO issued a closure letter for Admin Complaint Numbers 03r-07-r9, 10r-07-r9 and 01r-11-r9 involving the Maricopa County Air Quality Department regarding alleged complaints that MCAQD violated Title 6 of the Civil Rights Act of 1964.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Emergency plan for the geologic repository operations area... OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Emergency Planning Criteria § 63.161 Emergency plan for the geologic repository operations area through permanent...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs); CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report covers fiscal year 2015 (October 2014 through September 2015). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and are summarized in each CAU-specific section inmore » Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.« less
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2014 CFR
2014-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2011 CFR
2011-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2010 CFR
2010-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2012 CFR
2012-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2013 CFR
2013-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
Planning and Teaching To Remember.
ERIC Educational Resources Information Center
Davies, Nigel R.
2001-01-01
Suggests simple planning and instructional strategies to improve student learning and understanding for present and long -term application. The first section discusses learner-related issues. The second section focuses on the lesson plan (the introduction, the lesson body, and the lesson closure). The third section examines other strategies for…
Communicating Performance Assessments Results - 13609
DOE Office of Scientific and Technical Information (OSTI.GOV)
Layton, Mark
2013-07-01
The F-Area Tank Farms (FTF) and H-Area Tank Farm (HTF) are owned by the U.S. Department of Energy (DOE) and operated by Savannah River Remediation LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF and HTF are active radioactive waste storage and treatment facilities consisting of 51 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. Performance Assessments (PAs) for each Tank Farm have been prepared to support the eventual closure of the underground radioactive waste tanks and ancillary equipment. PAs provide the technical bases and results to bemore » used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of the Tank Farms. The Tank Farms are subject to a number of regulatory requirements. The State regulates Tank Farm operations through an industrial waste water permit and through a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Closure documentation will include State-approved Tank Farm Closure Plans and tank-specific closure modules utilizing information from the PAs. For this reason, the State of South Carolina and the EPA must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. PAs are performance-based, risk-informed analyses of the fate and transport of FTF and HTF residual wastes following final closure of the Tank Farms. Since the PAs serve as the primary risk assessment tools in evaluating readiness for closure, it is vital that PA conclusions be communicated effectively. In the course of developing the FTF and HTF PAs, several lessons learned have emerged regarding communicating PA results. When communicating PA results it is important to stress that the primary goal of the PA results is to provide risk understanding, recognizing the magnitude of risk and identifying the conceptual model decisions and critical assumptions that most impact the results. Conceptual models that describe reality using simplified, mathematical approaches, and their roles in arriving at the PA results, must also be communicated. When presenting PA results, evaluations will typically be focused on a single baseline (or Base Case) to provide a foundation for discussion. The PA results are supplemented by other studies (alternate configurations, uncertainty analyses, and sensitivity analyses) which provide a breadth of modeling to supplement the Base Case. The suite of information offered by the various modeling cases and studies provides confidence that the overall risk is understood along with the underlying parameters and conditions that contribute to risk. (author)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
ROMINE, L.D.
2006-02-01
A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach tomore » Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress.« less
Manukovsky, N S; Kovalev, V S; Somova, L A; Gurevich, Yu L; Sadovsky, M G
2005-01-01
Bioregenerative life support systems (BLSS) with different coefficients of closure are considered. The 66.2% coefficient of closure achieved in "BIOS-3" facility experiments has been taken as a base value. The increase in coefficient of closure up to 72.6-93.0% is planned due to use of soil-like substrate (SLS) and concentrating of urine. Food values were estimated both in a base variant ("BIOS-3"), and with increases in the coefficient of closure. It is shown that food requirements will be more fully satisfied by internal crop production with an increase in the coefficient of closure of the BLSS. Changes of massflow rates on an 'input-output' and inside BLSS are considered. Equations of synthesis and degradation of organic substances in BLSS were examined using a stoichiometric model. The paper shows that at incomplete closure of BLSS containing SLS there is a problem of nitrogen balancing. To compensate for the removal of nitrogen from the system in urine and feces, it is necessary to introduce food and a nitrogen-containing additive. c2005 COSPAR. Published by Elsevier Ltd. All rights reserved.
Insurance Exchange Marketplace: Implications for Emergency Medicine Practice
Rankey, David S.
2012-01-01
The Patient Protection and Affordable Care Act of 2010 requires states to establish healthcare insurance exchanges by 2014 to facilitate the purchase of qualified health plans. States are required to establish exchanges for small businesses and individuals. A federally operated exchange will be established, and states failing to participate in any other exchanges will be mandated to join the federal exchange. Policymakers and health economists believe that exchanges will improve healthcare at lower cost by promoting competition among insurers and by reducing burdensome transaction costs. Consumers will no longer be isolated from monthly insurance premium costs. Exchanges will increase the number of patients insured with more cost-conscious managed care and high-deductible plans. These insurance plan models have historically undervalued emergency medical services, while also underinsuring patients and limiting their healthcare system access to the emergency department. This paradoxically increases demand for emergency services while decreasing supply. The continual devaluation of emergency medical services by insurance payers will result in inadequate distribution of resources to emergency care, resulting in further emergency department closures, increases in emergency department crowding, and the demise of acute care services provided to families and communities. PMID:22900107
PLUTONIUM FINISHING PLANT (PFP) 241-Z LIQUID WASTE TREATMENT FACILITY DEACTIVATION AND DEMOLITION
DOE Office of Scientific and Technical Information (OSTI.GOV)
JOHNSTON GA
2008-01-15
Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste Treatment Facility Deactivation and Demolition (D&D) Project for consideration by the Project Management Institute as Project of the Year for 2008. The decommissioning of the 241-Z Facility presented numerous challenges, many of which were unique with in the Department of Energy (DOE) Complex. The majority of the project budget and schedule was allocated for cleaning out five below-grade tank vaults. These highly contaminated, confined spaces also presented significant industrial safety hazards that presented some of the most hazardous work environments on the Hanford Site.more » The 241-Z D&D Project encompassed diverse tasks: cleaning out and stabilizing five below-grade tank vaults (also called cells), manually size-reducing and removing over three tons of process piping from the vaults, permanently isolating service utilities, removing a large contaminated chemical supply tank, stabilizing and removing plutonium-contaminated ventilation ducts, demolishing three structures to grade, and installing an environmental barrier on the demolition site . All of this work was performed safely, on schedule, and under budget. During the deactivation phase of the project between November 2005 and February 2007, workers entered the highly contaminated confined-space tank vaults 428 times. Each entry (or 'dive') involved an average of three workers, thus equaling approximately 1,300 individual confined -space entries. Over the course of the entire deactivation and demolition period, there were no recordable injuries and only one minor reportable skin contamination. The 241-Z D&D Project was decommissioned under the provisions of the 'Hanford Federal Facility Agreement and Consent Order' (the Tri-Party Agreement or TPA), the 'Resource Conservation and Recovery Act of 1976' (RCRA), and the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980' (CERCLA). The project completed TPA Milestone M-083-032 to 'Complete those activities required by the 241-Z Treatment and Storage Unit's RCRA Closure Plan' four years and seven months ahead of this legally enforceable milestone. In addition, the project completed TPA Milestone M-083-042 to 'Complete transition and dismantlement of the 241-2 Waste Treatment Facility' four years and four months ahead of schedule. The project used an innovative approach in developing the project-specific RCRA closure plan to assure clear integration between the 241-Z RCRA closure activities and ongoing and future CERCLA actions at PFP. This approach provided a regulatory mechanism within the RCRA closure plan to place segments of the closure that were not practical to address at this time into future actions under CERCLA. Lessons learned from th is approach can be applied to other closure projects within the DOE Complex to control scope creep and mitigate risk. A paper on this topic, entitled 'Integration of the 241-Z Building D and D Under CERCLA with RCRA Closure at the PFP', was presented at the 2007 Waste Management Conference in Tucson, Arizona. In addition, techniques developed by the 241-Z D&D Project to control airborne contamination, clean the interior of the waste tanks, don and doff protective equipment, size-reduce plutonium-contaminated process piping, and mitigate thermal stress for the workers can be applied to other cleanup activities. The project-management team developed a strategy utilizing early characterization, targeted cleanup, and close coordination with PFP Criticality Engineering to significantly streamline the waste- handling costs associated with the project . The project schedule was structured to support an early transition to a criticality 'incredible' status for the 241-Z Facility. The cleanup work was sequenced and coordinated with project-specific criticality analysis to allow the fissile material waste being generated to be managed in a bulk fashion, instead of individual waste packages. This approach negated the need for real-time assay of individual waste packages, greatly improving the efficiency of the cleanup operation. The cleanup and stabilization of the 241-2 Liquid Effluent Treatment Facility reduced radiological risks to the environment and Hanford site workers. It was recognized as a success by regulatory agencies, the media, the DOE-client, and stakeholders. The 241-Z D&D Project demonstrated management excellence in adapting to significant changes in project direction, fostered a safety culture that amassed impressive results on this high-hazard job, maintained excellent communications with the client and stakeholders, and developed and implemented unique cleanup techniques.« less
Joynt, Karen E; Chatterjee, Paula; Orav, E John; Jha, Ashish K
2015-05-01
The Affordable Care Act (ACA) set in motion payment changes that could put pressure on hospital finances and lead some hospitals to close. Understanding the impact of closures on patient care and outcomes is critically important. We identified 195 hospital closures in the United States between 2003 and 2011. We found no significant difference between the change in annual mortality rates for patients living in hospital service areas (HSAs) that experienced one or more closures and the change in rates in matched HSAs without a closure (5.5 percent to 5.2 percent versus 5.4 percent to 5.4 percent, respectively). Nor was there a significant difference in the change in all-cause mortality rates following hospitalization (9.1 percent to 8.2 percent in HSAs with a closure versus 9.0 percent to 8.4 percent in those without a closure). HSAs with a closure had a drop in readmission rates compared to controls (19.4 percent to 18.2 percent versus 18.8 percent to 18.3 percent). Overall, we found no evidence that hospital closures were associated with worse outcomes for patients living in those communities. These findings may offer reassurance to policy makers and clinical leaders concerned about the potential acceleration of hospital closures as a result of health care reform. Project HOPE—The People-to-People Health Foundation, Inc.
Navarro, J. Alexander; Kohl, Katrin S.; Cetron, Martin S.; Markel, Howard
2017-01-01
Applying qualitative historical methods, we examined the consideration and implementation of school closures as a nonpharmaceutical intervention (NPI) in thirty US cities during the spring 2009 wave of the pA(H1N1) influenza pandemic. We gathered and performed close textual readings of official federal, state, and municipal government documents; media coverage; and academic publications. Lastly, we conducted oral history interviews with public health and education officials in our selected cities. We found that several local health departments pursued school closure plans independent of CDC guidance, that uncertainty of action and the rapidly evolving understanding of pA(H1N1) contributed to tension and pushback from the public, that the media and public perception played a significant role in the response to school closure decisions, and that there were some notable instances of interdepartmental communication breakdown. We conclude that health departments should continue to develop and fine-tune their action plans while also working to develop better communication methods with the public, and work more closely with education officials to better understand the complexities involved in closing schools. Lastly, state and local governments should work to resolve lingering issues of legal authority for school closures in times of public health crises. PMID:26921384
Navarro, J Alexander; Kohl, Katrin S; Cetron, Martin S; Markel, Howard
2016-06-01
Applying qualitative historical methods, we examined the consideration and implementation of school closures as a nonpharmaceutical intervention (NPI) in thirty US cities during the spring 2009 wave of the pA(H1N1) influenza pandemic. We gathered and performed close textual readings of official federal, state, and municipal government documents; media coverage; and academic publications. Lastly, we conducted oral history interviews with public health and education officials in our selected cities. We found that several local health departments pursued school closure plans independent of CDC guidance, that uncertainty of action and the rapidly evolving understanding of pA(H1N1) contributed to tension and pushback from the public, that the media and public perception played a significant role in the response to school closure decisions, and that there were some notable instances of interdepartmental communication breakdown. We conclude that health departments should continue to develop and fine-tune their action plans while also working to develop better communication methods with the public, and work more closely with education officials to better understand the complexities involved in closing schools. Lastly, state and local governments should work to resolve lingering issues of legal authority for school closures in times of public health crises. Copyright © 2016 by Duke University Press.
40 CFR 267.112 - What procedures must I follow?
Code of Federal Regulations, 2011 CFR
2011-07-01
.... (1) Events leading to a change in the closure plan, and therefore requiring a modification, may include: (i) A change in the operating plan or facility design; (ii) A change in the expected year of...
NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nikolich, George; Mizell, Steve; McCurdy, Greg
2017-10-01
Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. The emphasis of the work is on collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans thatmore » are being developed, which will facilitate the appropriate closure design and post-closure monitoring.« less
40 CFR 146.93 - Post-injection site care and site closure.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of a Class VI well must prepare, maintain, and comply with a plan for post-injection site care and site...
SEMINAR PUBLICATION: DESIGN, OPERATION, AND CLOSURE OF MUNICIPAL SOLID WASTE LANDFILLS
This report assists landfill owners and operators in complying with requirements under authority of subtitle D of the Resource Conservation and Recovery Act (RCRA) and Section 405 of the Clean Water Act. A series of 2-day seminars were presented in 14 different locations during t...
The closure problem for turbulence in meteorology and oceanography
NASA Technical Reports Server (NTRS)
Pierson, W. J., Jr.
1985-01-01
The dependent variables used for computer based meteorological predictions and in plans for oceanographic predictions are wave number and frequency filtered values that retain only scales resolvable by the model. Scales unresolvable by the grid in use become 'turbulence'. Whether or not properly processed data are used for initial values is important, especially for sparce data. Fickian diffusion with a constant eddy diffusion is used as a closure for many of the present models. A physically realistic closure based on more modern turbulence concepts, especially one with a reverse cascade at the right times and places, could help improve predictions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the stakeholders as preferred corrective action for the debris pile at CAS 05-45-01 (Hamilton). The closure in place was accomplished by posting signs containing a warning label on the existing contamination area fence line; and recording the FFACO UR and administrative UR in the FFACO database, the NNSA/NFO CAU/CAS files, and the management and operating contractor Geographic Information Systems. The clean closure was accomplished by excavating the soil/debris pile, disposing of the contents at the Area 5 Radioactive Waste Management Complex, and collecting verification samples. The corrective actions were implemented as stipulated in the CADD/CAP, and verification sample results confirm that the criteria for the completion of corrective actions have been met. Based on the implementation of these corrective actions, NNSA/NFO provides the following recommendations: No further corrective actions are necessary for CAU 573; The Nevada Division of Environmental Protection should issue a Notice of Completion to NNSA/NFO for closure of CAU 573; CAU 573 should be moved from Appendix III to Appendix IV of the FFACO.« less
1991-02-01
to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the wastes, application of advanced technology, or alternative disposal, treatment, or re-use.... 265.118 Section 265.118 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT...
Arango-Lasprilla, Juan Carlos; Ketchum, Jessica M; Hurley, Jessica; Getachew, Almaz M; Gary, Kelli Williams
2014-01-01
Approximately 25% of working-aged Americans with disabilities work full or part time, yet still face discrimination despite the passing of the American's with Disabilities Act (ADA) over 20 years ago. To determine if the proportion of allegations of ADA Title I workplace discrimination with merit closed at any year between 1993 and 2008 differs among Whites, African Americans, Hispanics, and Asians; to determine if there was a change over time from 1993 to 2008 in merit closure rate within each race/ethnicity group; and to determine whether changes over time between 1993 and 2008 in the merit closure rate differ among the race/ethnicity groups. Logistic regression was used for this cross-sectional panel study to model the merit closure rate for each ethnic group from 1993 to 2008 using 318,587 charging parties from the EEOC database. All ethnic groups exhibited significant changes over time in the merit closure rate. There were significant differences in the closure rates among the race/ethnicity groups specifically at closure years 1995-2000, 2002, 2003, and 2006. Finally, there was evidence that the trends in merit closure rates over time differed significantly among the race/ethnicity groups. There was significant evidence that the proportion of claims closed with merit was significantly different among the racial/ethnicity groups.
Ren, Jianan; Yuan, Yujie; Zhao, Yunzhao; Gu, Guosheng; Wang, Gefei; Chen, Jun; Fan, Chaogang; Wang, Xinbo; Li, Jieshou
2014-04-01
The use of open abdomen in the management of gastrointestinal fistula complicated with severe intra-abdominal infection is uncommon. This study was designed to evaluate outcomes of our staged approach for the infected open abdomen. Patients who had gastrointestinal fistula and underwent open abdomen treatment were retrospectively reviewed. Various materials such as polypropylene mesh and a modified sandwich package were used to achieve temporary abdominal closure followed by skin grafting when the granulation bed matured. A delayed definitive operation was performed for final abdominal closure without implant of prosthetic mesh. Between 1999 and 2009, 56 (68.3%) of 82 patients survived through this treatment. Among them, 42 patients achieved final abdominal closure. Spontaneous fistula closure occurred in 16 patients with secondary fistula recorded in six patients. Besides, wound complications occurred in 13 patients with two cases for pulmonary infection. Within a 12-month follow-up period after definitive closure, no additional fistula was recorded excluding planned ventral hernia repair. Open abdomen treatment was effective for gastrointestinal fistula complicated by severe intra-abdominal infection. A delayed and deliberate operative strategy aiming at fistula excision and fascial closure, with simultaneous abdominal wall reconstruction, was required for the infected open abdomen.
Sampling and monitoring for closure
McLemore, Virginia T.; Smith, Kathleen S.; Russell, Carol C.
2007-01-01
An important aspect of planning a new mine or mine expansion within the modern regulatory framework is to design for ultimate closure. Sampling and monitoring for closure is a form of environmental risk management. By implementing a sampling and monitoring program early in the life of the mining operation, major costs can be avoided or minimized. The costs for treating mine drainage in perpetuity are staggering, especially if they are unanticipated. The Metal Mining Sector of the Acid Drainage Technology Initiative (ADTI-MMS), a cooperative government-industry-academia organization, was established to address drainage-quality technologies of metal mining and metallurgical operations. ADTI-MMS recommends that sampling and monitoring programs consider the entire mine-life cycle and that data needed for closure of an operation be collected from exploration through postclosure.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick; Petrello, Jaclyn
This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.« less
Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.
2014-03-03
This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence withmore » the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
This Closure Report (CR) presents information supporting a closure recommendation for Corrective Action Unit (CAU) 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada, in compliance with the requirements of the Federal Facility Agreement and Consent Order. This CAU contains six Corrective Action Sites (CASs): 12-25-04, UST 12-16-2 Waste Oil Release; 18-25-01, 18-25-02, 18-25-03, Oil Spills; 18-25-04, Spill (Diesel Fuel); and 29-44-01, Fuel Spill, located within Areas 12, 18, and 29 on the Nevada Test Site. The purpose of this CR is to provide documentation supporting recommendations of no further action or closure in place for CASsmore » within CAU 394. Throughout late 2002 and early to mid 2003, closure activities were performed as set forth in the CAU 394 Streamlined Approach for Environmental Restoration Plan. The closure activities identified the nature and extent of contaminants of potential concern at the CASs, and provided sufficient information and data to complete appropriate corrective actions for the CASs. Soil in CASs 18-25-02 and 18-25-03 containing polychlorinated biphenyls exceeding the action levels established by the Nevada Administrative Code were removed for proper disposal. The soil remaining in these CASs containing petroleum hydrocarbons exceeding the action level were closed in place with use restrictions. Corrective Action Sites 18-25-04 required no further corrective action; closure in place is required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03, and 29-44-01; and use restrictions are required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03 and 29-44-01. In summary, no corrective action plan is required for CAU 394.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less
2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
West, W. J.; Lucas, J. G.; Gano, K. A.
2011-11-14
This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractor’s revegetation and mitigation areas on the Hanford Site.
SPONTANEOUS CLOSURE OF A MACULAR HOLE AFTER FOUR FAILED VITRECTOMIES IN THE SETTING OF NF-1.
Wannamaker, Kendall W; Sharpe, Robert A; Kylstra, Jan A
2018-01-01
To present the case of a patient who developed spontaneous closure of an idiopathic macular hole after four failed attempts at surgical closure. This is a retrospective case review of the medical record of a single patient. No statistical analysis was performed. The patient is a 71-year-old white woman with neurofibromatosis Type 1 who presented to the retina clinic of one of the authors. The patient underwent four vitrectomies with long acting gas by two surgeons over the course of 2 years. After each surgery, the hole either did not close or it closed and then reopened within 1 year. Five months after the last surgery (1 year after the hole last reopened), the patient presented with improved vision and spontaneous closure of the macular hole. The hole has remained closed since then. This case demonstrates that spontaneous closure of a macular hole, associated with excellent visual recovery, can occur after multiple surgical failures. We propose that enhanced scar formation due to neurofibromatosis Type 1 was responsible for both the numerous failures following initially successful surgery (centrifugal traction) and for the spontaneous closure (centripetal traction).
Velopharyngeal closure and the longus capitis muscle.
Yamawaki, Y; Nishimura, Y; Suzuki, Y
1996-09-01
The dynamic mechanism of velopharyngeal function not only in normal individuals but also in patients with velopharyngeal insufficiency, which is mainly related to cleft palate, has been the subject of considerable interest and controversy. Recently, in order to clarify velopharyngeal movement in the valvular action on phonation we examined dynamic MR images of this area taken in the transverse plane in parallel with the muscle sling of levator veli palatini. In cases in whom the closure pattern in that plane is circular, detailed observation revealed a very interesting result; that is, the longus capitis muscle, one of the group of anterior vertebral muscles, is directly involved in velopharyngeal valving function. It has not previously been reported that the longus capitis muscle acts as one of the velopharyngeal closure muscles, in addition to levator veli palatini. The present study demonstrated that contraction of the muscle contributed to velopharyngeal closure by forward movement of the pharyngeal wall.
DOE Office of Scientific and Technical Information (OSTI.GOV)
HOPKINS, A.M.
2007-02-20
The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the ''Resource Conservation and Recovery Act of 1976'' (RCRA) and Washington State ''Hazardous Waste Management Act, RCW 70.105'', have been deactivated and are being actively decommissioned. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4, D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building.more » The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground mining from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the ''Hanford Facility Dangerous Waste Closure Plant, 241-Z Treatment and Storage Tanks''.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
HOPKINS, A.M.
2005-02-23
The Plutonium Finishing Plant (PFP) and associated processing facilities are located in the 200 area of the Hanford Site in Eastern Washington. This area is part of what is now called the Central Plateau. In order to achieve closure of the contaminated facilities and waste sites at Hanford on the Central Plateau (CP), a geographic re-districting of the area into zones has been proposed in the recently published Plan for Central Plateau Closure. One of the 22 zones proposed in the Central Plateau encompasses the PFP and ancillary facilities. Approximately eighty six buildings are included in the PFP Zone. Thismore » paper addresses the approach for the closure of the PFP Zone within the Central Plateau. The PFP complex of buildings forms the bulk of the structures in the PFP Zone. For closure of the above-grade portion of structures within the PFP complex, the approach is to remove them to a state called ''slab-on-grade'' per the criteria contained in PFP End Point Criteria document and as documented in action memoranda. For below-grade portions of the structures (such as below-grade rooms, pipe trenches and underground ducts), the approach is to remove as much residual contamination as practicable and to fill the void spaces with clean fill material such as sand, grout, or controlled density fill. This approach will be modified as planning for the waste sites progresses to ensure that the actions of the PFP decommissioning projects do not negatively impact future planned actions under the CERCLA. Cribs, settling tanks, septic tanks and other miscellaneous below-grade void spaces will either be cleaned to the extent practicable and filled or will be covered with an environmental barrier as determined by further studies and CERCLA decision documents. Currently, between two and five environmental barriers are proposed to be placed over waste sites and remaining building slabs in the PFP Zone.« less
Planning for the closure of uncontrolled landfills in Turkey to reduce environmental impacts.
Ergene Şentürk, Didar; Alp, Emre
2016-11-01
Landfilling is the most preferred solid waste disposal method in Turkey owing to both economic and technical reasons. However, beside the sanitary landfills there are also hundreds of uncontrolled waste sites located throughout Turkey, which are often left either abandoned or burning. Because there is a lack of legislative guidelines governing the closure and rehabilitation of these dumpsites, the municipalities that are responsible for waste management do not initiate the proactive strategies required for the closure of these sites. In this study, a method based on a multi-criteria analysis is conducted for different dumpsites in Turkey to evaluate the level of negative impacts on the environment. This method is based on the use of environmental indices for a quantitative assessment of the landfills, such as environmental interaction between the source and the receptors, environmental values of the receptors, and operational conditions. It was possible to assess the robustness of the proposed methodology since the pre- and post-groundwater quality monitoring data was available from the study sites that were closed and rehabilitated in 2014. The results of this study show that the method based on a multi-criteria analysis is an effective tool while in the preliminary planning stages of closure and rehabilitation activities of uncontrolled waste landfills. © The Author(s) 2016.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Finley, Robert; Payne, William; Kirksey, Jim
2015-06-01
The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO 2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.
Patient-specific catheter shaping for the minimally invasive closure of the left atrial appendage.
Graf, Eva C; Ott, Ilka; Praceus, Julian; Bourier, Felix; Lueth, Tim C
2018-06-01
The minimally invasive closure of the left atrial appendage is a promising alternative to anticoagulation for stroke prevention in patients suffering from atrial fibrillation. One of the challenges of this procedure is the correct positioning and the coaxial alignment of the tip of the catheter sheath to the implant landing zone. In this paper, a novel preoperative planning system is proposed that allows patient-individual shaping of catheters to facilitate the correct positioning of the catheter sheath by offering a patient-specific catheter shape. Based on preoperative three-dimensional image data, anatomical points and the planned implant position are marked interactively and a patient-specific catheter shape is calculated if the standard catheter is not considered as suitable. An approach to calculate a catheter shape with four bends by maximization of the bending radii is presented. Shaping of the catheter is supported by a bending form that is automatically generated in the planning program and can be directly manufactured by using additive manufacturing methods. The feasibility of the planning and shaping of the catheter could be successfully shown using six data sets. The patient-specific catheters were tested in comparison with standard catheters by physicians on heart models. In four of the six tested models, the participating physicians rated the patient-individual catheters better than the standard catheter. The novel approach for preoperatively planned and shaped patient-specific catheters designed for the minimally invasive closure of the left atrial appendage could be successfully implemented and a feasibility test showed promising results in anatomies that are difficult to access with the standard catheter.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report presents the results of the Community Environmental Response Facilitation Act (CERFA) Investigation Conducted by Environmental Resources Management (ERM) at Cameron Station, A U.S. Government property selected for closure by the Base Realignment and Closure (BRAC) Commission. Under CERFA, Federal agencies are required to identify expeditiously real property that can be immediately reused and redeveloped. Satisfying this objective requires the identification of real property where no hazardous substances or petroleum products, regulated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), were stored for one year or more, known to have been released, or disposed. Cameron Station ismore » 169-acre site located in Alexandria, Virginia. Cameron Station was purchased by the Federal Government at the start of World War II. It has served primarily as a supply and administrative facility. The current mission is to provide support to the Commanding General of the Military District of Washington (MDW). Support functions of environmental significance include vehicle maintenance, print and paintshops, and photographic laboratories.« less
Orthodontic Replacement of Lost Permanent Molar with Neighbor Molar: A Six-Year Follow-Up
Shintcovsk, Ricardo Lima; Knop, Luegya Amorim Henriques; Sampaio, Luana Paz
2017-01-01
Extraction is very frequent indication in orthodontic planning, especially when there are crowding, biprotrusion, and aesthetically unpleasant profiles. Next to extraction comes space closure, which represents a challenge for orthodontists because of extended treatment time, discomfort created for the patient, tissue tolerance, and stability concerns. When it comes to what mechanics to choose for space closure, loops present two major advantages in relation to sliding mechanics: absence of abrasion and possibility to reach pure dental translation. A case is presented where an adult female patient with early loss of the first lower permanent molars, minor lower crowding, and tooth biprotrusion was treated with upper first bicuspids extraction along with upper and lower space closure done with T-loops to promote best space closure control in order to correct the malocclusion and enhance facial aesthetics. PMID:29318054
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2014-01-31
This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and, CAU 112, Area 23 Hazardous Waste Trenches.
Taube, M.; Porter, R. J.; Lord, P. H.
1983-01-01
We have conducted a controlled trial to compare skin closure using conventional interrupted sutures with a combination of subcuticular suture and sterile Micropore tape in 169 patients undergoing appendicectomy, inguinal herniorrhaphy, or saphenofemoral ligation. We have found that the combination technique consistently gives a better cosmetic result and that the tape acts well as a dressing, is convenient, and is well tolerated by patients. Images Fig. 1 Fig. 2 Fig. 3 Fig. 4 PMID:6344732
2011-01-01
Background School closure was employed as a non-pharmaceutical intervention against pandemic 2009 H1N1, particularly during the first wave. More than 700 schools in the United States were closed. However, closure decisions reflected significant variation in rationales, decision triggers, and authority for closure. This variability presents the opportunity for improved efficiency and decision-making. Methods We identified media reports relating to school closure as a response to 2009 H1N1 by monitoring high-profile sources and searching Lexis-Nexis and Google news alerts, and reviewed reports for key themes. News stories were supplemented by observing conference calls and meetings with health department and school officials, and by discussions with decision-makers and community members. Results There was significant variation in the stated goal of closure decision, including limiting community spread of the virus, protecting particularly vulnerable students, and responding to staff shortages or student absenteeism. Because the goal of closure is relevant to its timing, nature, and duration, unclear rationales for closure can challenge its effectiveness. There was also significant variation in the decision-making authority to close schools in different jurisdictions, which, in some instances, was reflected in open disagreement between school and public health officials. Finally, decision-makers did not appear to expect the level of scientific uncertainty encountered early in the pandemic, and they often expressed significant frustration over changing CDC guidance. Conclusions The use of school closure as a public health response to epidemic disease can be improved by ensuring that officials clarify the goals of closure and tailor closure decisions to those goals. Additionally, authority to close schools should be clarified in advance, and decision-makers should expect to encounter uncertainty disease emergencies unfold and plan accordingly. PMID:21284865
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
1998-01-06
The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA
This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CASmore » 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.« less
Stec, Andrew A; Baradaran, Nima; Schaeffer, Anthony; Gearhart, John P; Matthews, Ranjiv I
2012-10-01
Successful primary bladder closure of classic bladder exstrophy sets the stage for development of adequate bladder capacity and eventual voided continence. The postoperative pathway following primary bladder closure at the authors' institution is quantitatively and qualitatively detailed. Sixty-five consecutive newborns (47 male) undergoing primary closure of classic bladder exstrophy were identified and data were extracted relating to immediate postoperative care. Overall success rate was utilized to validate the pathway. Mean age at time of primary closure was 4.6 days and mean hospital stay was 35.8 days. Osteotomy was performed in 19 patients (mean age 8.8 days), and was not required in 39 infants (mean age 2.9 days). All patients were immobilized for 4 weeks. Tunneled epidural analgesia was employed in 61/65 patients. All patients had ureteral catheters and a suprapubic tube, along with a comprehensive antibiotic regimen. Postoperative total parenteral nutrition was commonly administered, and enteral feedings started around day 4.6. Our success rate of primary closure was 95.4%. A detailed and regimented plan for bladder drainage, immobilization, pain control, nutrition, antimicrobial prophylaxis, and adequate healing time is a cornerstone for the postoperative management of the primary closure of bladder exstrophy. Copyright © 2011 Journal of Pediatric Urology Company. Published by Elsevier Ltd. All rights reserved.
Federal Agency Program Realignment and Closure Act
Rep. Sullivan, John [R-OK-1
2009-02-12
House - 05/04/2009 Referred to the Subcommittee on Government Management, Organization, and Procurement. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
2009-06-16
resolution of disapproval is passed by Congress. Following the actual base closings and realignments, DOD develops an environmental remediation plan...examination of the BRAC process, For environmental remediation issues, see CRS Report RS21822, Military Base Closures: DOD’s 2005 Internal Selection...review and remediation . 2 Prior to the 1988 BRAC round, military installations were closed, or their missions were altered by order of the Secretary of
DOE Office of Scientific and Technical Information (OSTI.GOV)
Project Integration
2005-09-26
The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.
Phase closure nulling: Theory and practice
NASA Astrophysics Data System (ADS)
Chelli, A.; Duvert, G.; Malbet, F.; Kern, P.
2009-11-01
We provide a complete theory of the phase closure of a binary system in which a small, feeble, and unresolved companion acts as a perturbing parameter on the spatial frequency spectrum of a dominant, bright, resolved source. We demonstrate that the influence of the companion can be measured with precision by measuring the phase closure of the system near the nulls of the primary visibility function. In these regions of phase closure nulling, frequency intervals always exist where the phase closure signature of the companion is larger than any systematic error and can thus be measured. We show that this technique allows retrieval of many astrophysically relevant properties of faint and close companions such as flux, position, and in favorable cases, spectrum. As a proof of concept, using the AMBER/VLTI instrument with 3 auxiliary telescopes of 1.8 m and only 15 minutes of on-sky integration, we detected the five magnitudes fainter companion of HD 59717 at only 3.5 stellar radii distance from the primary. This is one of the highest contrast detected by interferometry between a companion and its parent star. We conclude by a rapid study of the potentialities of phase closure nulling observations with current interferometers and explore the requirements for a new type of dedicated instrument.
50 CFR 648.22 - Closure of the fishery.
Code of Federal Regulations, 2011 CFR
2011-10-01
... specified for a period of up to 3 years; (2) ACL; ACT including RSA, DAH, DAP; bycatch level of the TALFF... review, may be specified for a period of up to 3 years; (3) ACL; commercial ACT, including RSA, DAH, DAP... less than or equal to the OFL. (ii) ACL. The ACL or Domestic ABC is calculated using the formula ACL...
Sampling and monitoring for closure
McLemore, V.T.; Russell, C.C.; Smith, K.S.
2004-01-01
The Metals Mining Sector of the Acid Drainage Technology Initiative (ADTI-MMS) addresses technical drainage-quality issues related to metal mining and related metallurgical operations, for future and active mines, as well as, for historical mines and mining districts. One of the first projects of ADTI-MMS is to develop a handbook describing the best sampling, monitoring, predicting, mitigating, and modeling of drainage from metal mines, pit lakes and related metallurgical facilities based upon current scientific and engineering practices. One of the important aspects of planning a new mine in today's regulatory environment is the philosophy of designing a new or existing mine or expansion of operations for ultimate closure. The holistic philosophy taken in the ADTI-MMS handbook maintains that sampling and monitoring programs should be designed to take into account all aspects of the mine-life cycle. Data required for the closure of the operation are obtained throughout the mine-life cycle, from exploration through post-closure.
Humid site stabilization and closure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cutshall, N.H.
1981-01-01
The purpose of the work described here is to identify and evaluate the importance of factors that are expected to dictate the nature of site stabilization and closure requirements. Subsequent efforts will plan for implementation of such requirements. Two principal areas of site stabilization and closure effort will be pursued initially - geological management and vegetation management. The geological effort will focus on chemical weathering and surficial erosion. Such catastrophic geologic events as landslides, flooding, earthquakes, volcanos, etc. are already considered in site selection and operation and these factors will not be emphasized initially. Vegetation management will be designed tomore » control erosion, to minimize nuclide mobilization by roots and to be compatible with natural successional pressures. It is anticipated that the results of this work will be important both to site selection and operation as well as the actual stabilization and closure procedure.« less
Groundwater quality assessment/corrective action feasibility plan: New TNX Seepage Basin
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nichols, R.L.
1989-12-05
The New TNX Seepage Basin is located across River Road east of the TNX Area at the Savannah River Site. Currently the basin is out of service and is awaiting closure in accordance with the Consent Decree settled under Civil Act No. 1:85-2583. Groundwater monitoring data from the detection monitoring network around the New TNX Seepage Basin was recently analyzed using South Carolina Hazardous Waste Management Regulations R.61-79.264.92 methods to determine if groundwater downgradient of the New TNX Seepage Basin had been impacted. Results from the data analysis indicate that the groundwater has been impacted by inorganic constituents with nomore » associated health risks. The impacts resulting from elevated levels of inorganic constituents, such as Mn, Na, and Total PO{sub 4} in the water table, do not pose a threat to human health and the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hasbrouck, J.C.; MacLean, H.D.; Geotech, R.
1996-11-01
Rust Geotech, operating contractor at the U.S. Department of Energy Grand Junction Projects Office (DOE-GJPO), conducted a demonstration of the trench boundary and large-object location capabilities of five nonintrusive geophysical methods in the Low-Level Radioactive Waste Disposal Facility (LLRWDF) at the DOE Savannah River Site (SRS). The plan for Resource Conservation and Recovery Act (RCRA) closure of the SRS LLRWDF specifies inplace compaction of {open_quotes}B-25{close_quotes} metal boxes containing low-level radioactive wastes. The boxes are buried in Engineered Low-Level Trenches (ELLTs) at the facility. To properly guide and control the compaction operation, the coordinates of the trench boundaries must be determinedmore » to an accuracy within 5 feet and the outer edges of the metal boxes in the trenches must be determined to within 2 feet.« less
Stephens, Neil; Dimond, Rebecca
2015-01-01
Biobanks are increasingly being established to act as mediators between patient-donors and researchers. In practice, some of these will close. This paper details the experiences of one such bank. We report interviews with the bank's staff and oversight group during the period when the bank ceased biobanking activity, reconfigured as a disseminator of best practice, before then closing altogether. The paper makes three distinct contributions: (i) to provide a detailed account of the establishment, operational challenges, and eventual closure of the bank, which makes clear the rapid turnover in a cycle of promise and disappointment; (ii) to explore this in terms of a novel analytical focus upon field, institutional, and individual expectations; and (iii) to use this typology to demonstrate how, even after the bank's closure, aspects of its work were reconfigured and reused in new contexts. This provides a unique empirical analysis of the under-reported issue of biobank closure. PMID:26740793
Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspectionmore » plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.« less
Watershed planning, implementation and assessment: the May River Watershed Action Plan case study
Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie
2016-01-01
Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...
Late Closure of a Stage III Idiopathic Macular Hole after Pars Plana Vitrectomy.
Afrashi, Filiz; Öztaş, Zafer; Nalçacı, Serhad
2015-12-01
A 57-year-old female presented to our hospital with decreased vision in her right eye. Detailed ocular examination was performed, and a macular hole was detected in the right eye. The presence of a full-thickness stage III macular hole was confirmed with optical coherence tomography (OCT) imaging. Pars plana vitrectomy followed by long-acting gas tamponade (C3F8) was performed as treatment. One month after surgery, clinical examination revealed a persistent macular hole, confirmed by an OCT scan. Although the patient was scheduled for reoperation, the surgery was postponed due to personal reasons of the patient. Surprisingly, after five months, a closure pattern with accompanying epiretinal membrane was observed in the macular hole area. The closure of the macular hole was completed without any further intervention 8 months post-surgery. In cases of unclosed macular hole after the first surgery, if a second surgery cannot be performed, follow-up with OCT recommended due to the possibility of spontaneous closure. However, spontaneous closure of a persistent macular hole following PPV is rare, so early diagnosis and surgical repair of unclosed macular holes must remain the primary goal.
Strategic Planning: Renewal and Redesign during Turbulent Times
ERIC Educational Resources Information Center
Cherrey, Cynthia; Clark, Evette Castillo
2010-01-01
In August 2005, Hurricane Katrina, the worst natural disaster in the history of the United States, forced the fall semester closure of Tulane University in New Orleans, Louisiana. In the aftermath of this unprecedented storm, the Tulane leadership set forth a plan for renewal to secure the survival, recovery, and sustainability of the institution,…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-10
... layer, a 24-inch native sand layer, an 18-inch imported silt evapotranspiration layer, and a 6-inch... Quality Assurance & Control Plan'' for the closure project that specifies that testing will be performed... described in detail in the ``Construction Quality Assurance & Control Plan.'' II. EPA's Action A...
Incorporating Conservation Zone Effectiveness for Protecting Biodiversity in Marine Planning
Makino, Azusa; Klein, Carissa J.; Beger, Maria; Jupiter, Stacy D.; Possingham, Hugh P.
2013-01-01
Establishing different types of conservation zones is becoming commonplace. However, spatial prioritization methods that can accommodate multiple zones are poorly understood in theory and application. It is typically assumed that management regulations across zones have differential levels of effectiveness (“zone effectiveness”) for biodiversity protection, but the influence of zone effectiveness on achieving conservation targets has not yet been explored. Here, we consider the zone effectiveness of three zones: permanent closure, partial protection, and open, for planning for the protection of five different marine habitats in the Vatu-i-Ra Seascape, Fiji. We explore the impact of differential zone effectiveness on the location and costs of conservation priorities. We assume that permanent closure zones are fully effective at protecting all habitats, open zones do not contribute towards the conservation targets and partial protection zones lie between these two extremes. We use four different estimates for zone effectiveness and three different estimates for zone cost of the partial protection zone. To enhance the practical utility of the approach, we also explore how much of each traditional fishing ground can remain open for fishing while still achieving conservation targets. Our results show that all of the high priority areas for permanent closure zones would not be a high priority when the zone effectiveness of the partial protection zone is equal to that of permanent closure zones. When differential zone effectiveness and costs are considered, the resulting marine protected area network consequently increases in size, with more area allocated to permanent closure zones to meet conservation targets. By distributing the loss of fishing opportunity equitably among local communities, we find that 84–88% of each traditional fishing ground can be left open while still meeting conservation targets. Finally, we summarize the steps for developing marine zoning that accounts for zone effectiveness. PMID:24223870
Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2010-02-28
Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives includedmore » No Further Action and Clean Closure.« less
Fleming, Padhraig S; Seehra, Jadbinder; Dibiase, Andrew T
2011-01-01
A history of traumatic dental injury to the maxillary central incisors during preadolescence or adolescence is common and may result in premature loss. Treatment options include prosthetic implant replacement, autotransplantation, and orthodontic space closure with direct composite recontouring. This case report describes the treatment of an adolescent girl who presented with a crowded Class I malocclusion complicated by a history of trauma to the maxillary central incisors. The treatment plan consisted of orthodontic space closure following loss of both maxillary central incisors and mandibular premolars. This case highlights that orthodontic space closure can be a valuable treatment option in selected Class I crowded and Class II uncrowded malocclusions, producing predictable and efficient results.
76 FR 65750 - Sunshine Act Meeting; Record of Vote of Meeting Closure
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... Commission, which started at approximately 11 a.m., on Thursday, September 8, 2011, at the U.S. Parole... any other business. Upon motion duly made, seconded, and carried, the following Commissioners voted...
75 FR 71420 - Department of the Navy
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-23
...) Brunswick, Maine. The DoN is required to close NAS Brunswick per Public Law 101-510, the Defense Base... with Public Law 101-510, the Defense Base closure and Realignment Act of 1990, as amended in 2005. NAS...
75 FR 81586 - Western Pacific Fishery Management Council; Public Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
... spatial closure impacts on the fishing community 2. Guam Fisheries Act 3. Indigenous Fishing Rights 4.... Impact of land-based pollution in fish from Saipan Lagoon 3. Saipan Lagoon net fishing data analysis 4...
Correction of MFG-E8 Resolves Inflammation and Promotes Cutaneous Wound Healing in Diabetes.
Das, Amitava; Ghatak, Subhadip; Sinha, Mithun; Chaffee, Scott; Ahmed, Noha S; Parinandi, Narasimham L; Wohleb, Eric S; Sheridan, John F; Sen, Chandan K; Roy, Sashwati
2016-06-15
Milk fat globule epidermal growth factor-factor 8 (MFG-E8) is a peripheral glycoprotein that acts as a bridging molecule between the macrophage and apoptotic cells, thus executing a pivotal role in the scavenging of apoptotic cells from affected tissue. We have previously reported that apoptotic cell clearance activity or efferocytosis is compromised in diabetic wound macrophages. In this work, we test the hypothesis that MFG-E8 helps resolve inflammation, supports angiogenesis, and accelerates wound closure. MFG-E8(-/-) mice displayed impaired efferocytosis associated with exaggerated inflammatory response, poor angiogenesis, and wound closure. Wound macrophage-derived MFG-E8 was recognized as a critical driver of wound angiogenesis. Transplantation of MFG-E8(-/-) bone marrow to MFG-E8(+/+) mice resulted in impaired wound closure and compromised wound vascularization. In contrast, MFG-E8(-/-) mice that received wild-type bone marrow showed improved wound closure and improved wound vascularization. Hyperglycemia and exposure to advanced glycated end products inactivated MFG-E8, recognizing a key mechanism that complicates diabetic wound healing. Diabetic db/db mice suffered from impaired efferocytosis accompanied with persistent inflammation and slow wound closure. Topical recombinant MFG-E8 induced resolution of wound inflammation, improvements in angiogenesis, and acceleration of closure, upholding the potential of MFG-E8-directed therapeutics in diabetic wound care. Copyright © 2016 by The American Association of Immunologists, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Suber, Gregory
2012-07-01
In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed onmore » tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)« less
School closures during the 2009 influenza pandemic: national and local experiences
2014-01-01
Background School closure is a non-pharmaceutical intervention that was considered in many national pandemic plans developed prior to the start of the influenza A(H1N1)pdm09 pandemic, and received considerable attention during the event. Here, we retrospectively review and compare national and local experiences with school closures in several countries during the A(H1N1)pdm09 pandemic. Our intention is not to make a systematic review of country experiences; rather, it is to present the diversity of school closure experiences and provide examples from national and local perspectives. Methods Data were gathered during and following a meeting, organized by the European Centres for Disease Control, on school closures held in October 2010 in Stockholm, Sweden. A standard data collection form was developed and sent to all participants. The twelve participating countries and administrative regions (Bulgaria, China, France, Hong Kong Special Administrative Region (SAR), Italy, Japan, New Zealand, Serbia, South Africa, Thailand, United Kingdom, and United States) provided data. Results Our review highlights the very diverse national and local experiences on school closures during the A(H1N1)pdm09 pandemic. The processes including who was in charge of making recommendations and who was in charge of making the decision to close, the school-based control strategies, the extent of school closures, the public health tradition of responses and expectations on school closure varied greatly between countries. Our review also discusses the many challenges associated with the implementation of this intervention and makes recommendations for further practical work in this area. Conclusions The single most important factor to explain differences observed between countries may have been the different public health practises and public expectations concerning school closures and influenza in the selected countries. PMID:24739814
32 CFR 174.18 - Historic preservation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT Environmental Matters § 174.18... planning and zoning actions undertaken by units of State or local government; if so, working with such...
32 CFR 174.18 - Historic preservation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT Environmental Matters § 174.18... planning and zoning actions undertaken by units of State or local government; if so, working with such...
Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): {sm_bullet} CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536more » Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure« less
Semb, Gunvor; Enemark, Hans; Friede, Hans; Paulin, Gunnar; Lilja, Jan; Rautio, Jorma; Andersen, Mikael; Åbyholm, Frank; Lohmander, Anette; Shaw, William; Mølsted, Kirsten; Heliövaara, Arja; Bolund, Stig; Hukki, Jyri; Vindenes, Hallvard; Davenport, Peter; Arctander, Kjartan; Larson, Ola; Berggren, Anders; Whitby, David; Leonard, Alan; Neovius, Erik; Elander, Anna; Willadsen, Elisabeth; Bannister, R Patricia; Bradbury, Eileen; Henningsson, Gunilla; Persson, Christina; Eyres, Philip; Emborg, Berit; Kisling-Møller, Mia; Küseler, Annelise; Granhof Black, Birthe; Schöps, Antje; Bau, Anja; Boers, Maria; Andersen, Helene Søgaard; Jeppesen, Karin; Marxen, Dorte; Paaso, Marjukka; Hölttä, Elina; Alaluusua, Suvi; Turunen, Leena; Humerinta, Kirsti; Elfving-Little, Ulla; Tørdal, Inger Beate; Kjøll, Lillian; Aukner, Ragnhild; Hide, Øydis; Feragen, Kristin Billaud; Rønning, Elisabeth; Skaare, Pål; Brinck, Eli; Semmingsen, Ann-Magritt; Lindberg, Nina; Bowden, Melanie; Davies, Julie; Mooney, Jeanette; Bellardie, Haydn; Schofield, Nina; Nyberg, Jill; Lundberg, Maria; Karsten, Agneta Linder-Aronson; Larson, Margareta; Holmefjord, Anders; Reisæter, Sigvor; Pedersen, Nina-Helen; Rasmussen, Therese; Tindlund, Rolf; Sæle, Paul; Blomhoff, Reidunn; Jacobsen, Gry; Havstam, Christina; Rizell, Sara; Enocson, Lars; Hagberg, Catharina; Najar Chalien, Midia; Paganini, Anna; Lundeborg, Inger; Marcusson, Agneta; Mjönes, Anna-Britta; Gustavsson, Annica; Hayden, Christine; McAleer, Eilish; Slevan, Emma; Gregg, Terry; Worthington, Helen
2017-02-01
Longstanding uncertainty surrounds the selection of surgical protocols for the closure of unilateral cleft lip and palate, and randomised trials have only rarely been performed. This paper is an introduction to three randomised trials of primary surgery for children born with complete unilateral cleft lip and palate (UCLP). It presents the protocol developed for the trials in CONSORT format, and describes the management structure that was developed to achieve the long-term engagement and commitment required to complete the project. Ten established national or regional cleft centres participated. Lip and soft palate closure at 3-4 months, and hard palate closure at 12 months served as a common method in each trial. Trial 1 compared this with hard palate closure at 36 months. Trial 2 compared it with lip closure at 3-4 months and hard and soft palate closure at 12 months. Trial 3 compared it with lip and hard palate closure at 3-4 months and soft palate closure at 12 months. The primary outcomes were speech and dentofacial development, with a series of perioperative and longer-term secondary outcomes. Recruitment of 448 infants took place over a 9-year period, with 99.8% subsequent retention at 5 years. The series of reports that follow this introductory paper include comparisons at age 5 of surgical outcomes, speech outcomes, measures of dentofacial development and appearance, and parental satisfaction. The outcomes recorded and the numbers analysed for each outcome and time point are described in the series. ISRCTN29932826.
43 CFR 3809.431 - When must I modify my plan of operations?
Code of Federal Regulations, 2012 CFR
2012-10-01
... impacts from unanticipated events or conditions or newly discovered circumstances or information... units; (6) Providing for post-closure management; and (7) Eliminating hazards to public safety. ...
43 CFR 3809.431 - When must I modify my plan of operations?
Code of Federal Regulations, 2013 CFR
2013-10-01
... impacts from unanticipated events or conditions or newly discovered circumstances or information... units; (6) Providing for post-closure management; and (7) Eliminating hazards to public safety. ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lockie, K.A.; Suttora, L.C.; Quigley, K.D.
2007-07-01
Significant progress has been made at the U.S. Department of Energy (DOE) Idaho National Laboratory (INL) to clean and close emptied radioactive liquid waste storage tanks at the Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility (TFF). The TFF includes eleven 1,135.6-kL (300,000-gal) underground stainless steel storage tanks and four smaller, 113.5-kL (30,000-gal) stainless steel tanks, along with tank vaults, interconnecting piping, and ancillary equipment. The TFF tanks have historically been used to store a variety of radioactive liquid waste, including wastes associated with past spent nuclear fuel reprocessing. Although four of the large storage tanks remain inmore » use for waste storage, the other seven 1,135.6-kL (300,000-gal) tanks and the four 113.5-kL (30,000-gal) tanks have been emptied of waste and cleaned in preparation of final closure. A water spray cleaning system was developed and deployed to clean internal tank surfaces and remove remaining tank wastes. The cleaning system was effective in removing all but a very small volume of solid residual waste particles. Recent issuance of an Amended Record of Decision (ROD) in accordance with the National Environmental Policy Act, and a Waste Determination complying with Section 3116 of the Ronald W. Reagan National Defense Authorization Act (NDAA) for Fiscal Year 2005, has allowed commencement of grouting activities on the cleaned tanks. In November 2006, three of the 113.5-kL (30,000-gal) tanks were filled with grout to provide long-term stability. It is currently planned that all seven cleaned 1,135.6-kL (300,000-gal) tanks, as well as the four 113.5-kL (30,000-gal) tanks and all associated tank vaults and interconnecting piping, will be stabilized with grout as early as 2008. (authors)« less
Keogh-Brown, Marcus Richard; Smith, Richard D; Edmunds, John W; Beutels, Philippe
2010-12-01
The 2003 outbreak of severe acute respiratory syndrome (SARS) showed that infectious disease outbreaks can have notable macroeconomic impacts. The current H1N1 and potential H5N1 flu pandemics could have a much greater impact. Using a multi-sector single country computable general equilibrium model of the United Kingdom, France, Belgium and The Netherlands, together with disease scenarios of varying severity, we examine the potential economic cost of a modern pandemic. Policies of school closure, vaccination and antivirals, together with prophylactic absence from work are evaluated and their cost impacts are estimated. Results suggest GDP losses from the disease of approximately 0.5-2% but school closure and prophylactic absenteeism more than triples these effects. Increasing school closures from 4 weeks at the peak to entire pandemic closure almost doubles the economic cost, but antivirals and vaccinations seem worthwhile. Careful planning is therefore important to ensure expensive policies to mitigate the pandemic are effective in minimising illness and deaths.
Hsia, Renee Y.; Srebotnjak, Tanja; Kanzaria, Hemal K.; McCulloch, Charles; Auerbach, Andrew D.
2015-01-01
Study Objective Emergency Department (ED) closures threaten community access to emergency services, but few data exist to describe factors associated with closure. We evaluated factors associated with ED closure in California and sought to determine if hospitals serving more vulnerable populations have a higher rate of ED closure. Methods Retrospective cohort study of California hospital EDs between 1998 and 2008, using hospital and patient level data from the California Office of Statewide Planning and Development (OSHPD), as well as OSHPD Patient Discharge Data. We examined the effects of hospital and patient factors on the hospital's likelihood of ED closure using Cox proportional hazards models. Results In 4,411 hospital-years of observation, 29 of 401 (7.2%) EDs closed. In a model adjusted for total ED visits, hospital discharges, trauma center and teaching status, ownership, operating margin, and urbanicity, hospitals with more black patients (OR 1.41 per increase in proportion of blacks by 0.1, 95% CI 1.16-1.72) and Medi-Cal recipients (OR 1.17 per increase in proportion insured by Medi-Cal by 0.1, 95% CI 1.02-1.34) had higher odds for ED closure, as did for-profit institutions (OR 1.65, 95% CI 1.13-2.41). Conclusion The population served by EDs and hospitals’ profit model are associated with ED closure. Whether our findings are a manifestation of poorer reimbursement in at-risk EDs is unclear. PMID:22093435
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-04
...NMFS implements an accountability measure (AM) for recreational gray triggerfish in the Gulf of Mexico (Gulf) reef fish fishery for the 2013 fishing year through this temporary final rule. Based on the projected recreational landings, NMFS determined that the recreational annual catch target (ACT) for Gulf gray triggerfish was reached in August 2013. Therefore, NMFS closes the recreational sector for gray triggerfish in the Gulf EEZ at 12:01 a.m., local time, October 15, 2013, until January 1, 2014. This closure is necessary to reduce overfishing of the Gulf gray triggerfish resource.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Freeman-Pollard, J.R.
1994-03-02
This engineering study addresses 50 inactive underground radioactive waste tanks. The tanks were formerly used for the following functions associated with plutonium and uranium separations and waste management activities in the 200 East and 200 West Areas of the Hanford Site: settling solids prior to disposal of supernatant in cribs and a reverse well; neutralizing acidic process wastes prior to crib disposal; receipt and processing of single-shell tank (SST) waste for uranium recovery operations; catch tanks to collect water that intruded into diversion boxes and transfer pipeline encasements and any leakage that occurred during waste transfer operations; and waste handlingmore » and process experimentation. Most of these tanks have not been in use for many years. Several projects have, been planned and implemented since the 1970`s and through 1985 to remove waste and interim isolate or interim stabilize many of the tanks. Some tanks have been filled with grout within the past several years. Responsibility for final closure and/or remediation of these tanks is currently assigned to several programs including Tank Waste Remediation Systems (TWRS), Environmental Restoration and Remedial Action (ERRA), and Decommissioning and Resource Conservation and Recovery Act (RCRA) Closure (D&RCP). Some are under facility landlord responsibility for maintenance and surveillance (i.e. Plutonium Uranium Extraction [PUREX]). However, most of the tanks are not currently included in any active monitoring or surveillance program.« less
Code of Federal Regulations, 2011 CFR
2011-10-01
... management uncertainty to recommend ACTs for the commercial and recreational fishing sectors as part of the... sources of management uncertainty that were considered, technical approaches to mitigating these sources..., DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the Scup Fishery...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-02
... order to contact state marine fishery agencies and fish houses, announce the closure on NOAA Weather.... 1801 et seq. Dated: January 28, 2011. Emily H. Menashes, Acting Director, Office of Sustainable...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-08-01
The purpose of this CADD/CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 571 based on the implementation of corrective actions. This includes a description of investigation activities, an evaluation of the data, and a description of corrective actions that were performed. The CAIP provides information relating to the scope and planning of the investigation. Therefore, that information will not be repeated in this document.
Roles of Historical Photography in Waste Site Characterization, Closure, and Remediation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mackey, H.
1998-07-01
Over 40,000 frames of vertical historical photography from 1938 to 1996 and over 10,000 frames of oblique photography from 1981 to 1991 of the 777-square kilometer Savannah River Site in south central South Carolina were reviewed, cataloged, and referenced utilizing ARCView and associated ArcInfo tools. This allows environmental reviews of over 400 potential waste units on the SRS to be conducted in a rapid fashion to support preparation of work plans, characterization, risk assessments, and closure of the waste units in a more cost effective manner.
Diastema: correction of excessive spaces in the esthetic zone.
Oquendo, Anabella; Brea, Luis; David, Steven
2011-04-01
The presence of a diastema or diastemata between teeth is a common feature found in the anterior dentition. Many forms of therapy can be used for diastema closure. A carefully developed diagnosis and advanced planning allows the most appropriate treatment to be determined for each individual case to address the patient's needs. Clinical considerations, advantages, disadvantages, and alternative treatment modalities for diastema closure are discussed in this article and a clinical case is presented to illustrate the application of these techniques. Copyright © 2011 Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bechtel Nevada; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
2005-05-01
This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 489: WWII UXO Sites, Tonopah Test Range. CAU 489 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996.
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. B. Campbell
2002-09-01
The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Testmore » Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.« less
Development of explosively driven launcher for meteoroid studies
NASA Technical Reports Server (NTRS)
Baum, D. W.
1973-01-01
The results of a continuing program to develop an explosively driven 2-stage hypervelocity launcher capable of achieving velocities between 15 and 20 km/sec are described. Previous efforts had identified incomplete barrel collapse as a limiting factor in launcher performance. Correlation of experimental and computational results obtained in the present study indicate that boundary-layer gases within the barrel act to prevent complete closure. Simplified calculations suggest that in-contact explosives may have insufficient energy densities to collapse the barrel against a developed boundary layer. Higher energy densities, sufficient to produce complete closure, were obtained with the use of steel flyer plates accelerated by a phased explosive lens. However, when flat flyer plates were impacted on the barrel, the sides of the barrel were observed to rupture and leak gas prior to barrel closure. A promising solution to this problem (untested) is to produce a symmetrical collapse with a cylindrical tube around the barrel.
Gap geometry dictates epithelial closure efficiency
Ravasio, Andrea; Cheddadi, Ibrahim; Chen, Tianchi; Pereira, Telmo; Ong, Hui Ting; Bertocchi, Cristina; Brugues, Agusti; Jacinto, Antonio; Kabla, Alexandre J.; Toyama, Yusuke; Trepat, Xavier; Gov, Nir; Neves de Almeida, Luís; Ladoux, Benoit
2015-01-01
Closure of wounds and gaps in tissues is fundamental for the correct development and physiology of multicellular organisms and, when misregulated, may lead to inflammation and tumorigenesis. To re-establish tissue integrity, epithelial cells exhibit coordinated motion into the void by active crawling on the substrate and by constricting a supracellular actomyosin cable. Coexistence of these two mechanisms strongly depends on the environment. However, the nature of their coupling remains elusive because of the complexity of the overall process. Here we demonstrate that epithelial gap geometry in both in vitro and in vivo regulates these collective mechanisms. In addition, the mechanical coupling between actomyosin cable contraction and cell crawling acts as a large-scale regulator to control the dynamics of gap closure. Finally, our computational modelling clarifies the respective roles of the two mechanisms during this process, providing a robust and universal mechanism to explain how epithelial tissues restore their integrity. PMID:26158873
Kuroki, Lindsay M; Mullen, Mary M; Massad, L Stewart; Wu, Ningying; Liu, Jingxia; Mutch, David G; Powell, Matthew A; Hagemann, Andrea R; Thaker, Premal H; McCourt, Carolyn K; Novetsky, Akiva P
2017-07-01
To compare wound complication rates after skin closure with staples and subcuticular suture in obese gynecology patients undergoing laparotomy through a midline vertical incision. In this randomized controlled trial, women with body mass indexes (BMIs) of 30 or greater undergoing surgery by a gynecologic oncologist through a midline vertical incision were randomized to skin closure with staples or subcuticular 4-0 monofilament suture. The primary outcome was the rate of wound complication, defined as the presence of a wound breakdown, or infection, within 8 weeks postoperatively. Secondary outcomes included operative time, Stony Brook scar cosmetic score, and patient satisfaction. A sample size of 162 was planned to detect a 50% reduction in wound complications. At planned interim review (n=82), there was no significant difference in primary outcome. Between 2013 and 2016, 163 women were analyzed, including 84 who received staples and 79 suture. Women who received staples were older (mean age 59 compared with 57 years), had lower mean BMI (37.3 compared with 38.9), and fewer benign indications for surgery (22 compared with 27). There were no differences in wound complication rates between staple compared with suture skin closure (28 [33%] compared with 25 [32%], relative risk 1.05, 95% confidence interval [CI] 0.68-1.64). Women with staples reported worse median cosmetic scores (four of five compared with five of five, P<.001), darker scar color (37 [49%] compared with 13 [18%], relative risk 2.69, 95% CI 1.57-4.63), and more skin marks (30 [40%] compared with three [4%], relative risk 9.47, 95% CI 3.02-29.65) compared with women with suture closure. There was no group difference regarding satisfaction with their scar. Stepwise multivariate analysis revealed BMI (odds ratio [OR] 1.13, 95% CI 1.07-1.20), maximum postoperative glucose (OR 1.01, 95% CI 1.00-1.01), and cigarette smoking (OR 4.96, 95% CI 1.32-18.71) were correlates of wound complication. Closure of midline vertical skin incisions with subcuticular suture does not reduce surgical site wound complications compared with staples in obese gynecology patients. ClinicalTrials.gov, NCT01977612.
Advance care treatment plan (ACT-Plan) for African American family caregivers: a pilot study.
Bonner, Gloria J; Wang, Edward; Wilkie, Diana J; Ferrans, Carol E; Dancy, Barbara; Watkins, Yashika
2014-01-01
Research is limited on end-of-life treatment decisions made by African American family caregivers. In a pilot study, we examined the feasibility of implementing an advance care treatment plan (ACT-Plan), a group-based education intervention, with African American dementia caregivers. Theoretically based, the ACT-Plan included strategies to enhance knowledge, self-efficacy, and behavioral skills to make end-of-life treatment plans in advance. Cardiopulmonary resuscitation, mechanical ventilation, and tube feeding were end-of-life treatments discussed in the ACT-Plan. In a four-week pre/posttest two-group design at urban adult day care centers, 68 caregivers were assigned to the ACT-Plan or attention-control health promotion conditions. Findings strongly suggest that the ACT-Plan intervention is feasible and appropriate for African American caregivers. Self-efficacy and knowledge about dementia, cardiopulmonary resuscitation, mechanical ventilation, and tube feeding increased for ACT-Plan participants but not for the attention-control. More ACT-Plan than attention-control participants developed advance care plans for demented relatives. Findings warrant a randomized efficacy trial.
78 FR 70005 - Naval Base Ventura County, San Nicolas Island, California; Restricted Area
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-22
... entities. c. Review Under the National Environmental Policy Act Due to the administrative nature of this... 2638 kHz and 2738 kHz or by contacting ``PLEAD CONTROL'' on VHF-FM radio channel 11 or 16. Closure...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-13
... to interested parties, NMFS will contact state marine fishery agencies and fish houses, announce the...: 16 U.S.C. 1801 et seq. Dated: October 7, 2011. Steven Thur, Acting Director, Office of Sustainable...
Niemeyer, María Isabel; Cid, L Pablo; Yusef, Yamil R; Briones, Rodolfo; Sepúlveda, Francisco V
2009-01-01
The ClC transport protein family comprises both Cl− ion channel and H+/Cl− and H+/NO3− exchanger members. Structural studies on a bacterial ClC transporter reveal a pore obstructed at its external opening by a glutamate side-chain which acts as a gate for Cl− passage and in addition serves as a staging post for H+ exchange. This same conserved glutamate acts as a gate to regulate Cl− flow in ClC channels. The activity of ClC-2, a genuine Cl− channel, has a biphasic response to extracellular pH with activation by moderate acidification followed by abrupt channel closure at pH values lower than ∼7. We have now investigated the molecular basis of this complex gating behaviour. First, we identify a sensor that couples extracellular acidification to complete closure of the channel. This is extracellularly-facing histidine 532 at the N-terminus of transmembrane helix Q whose neutralisation leads to channel closure in a cooperative manner. We go on to show that acidification-dependent activation of ClC-2 is voltage dependent and probably mediated by protonation of pore gate glutamate 207. Intracellular Cl− acts as a voltage-independent modulator, as though regulating the pKa of the protonatable residue. Our results suggest that voltage dependence of ClC-2 is given by hyperpolarisation-dependent penetration of protons from the extracellular side to neutralise the glutamate gate deep within the channel, which allows Cl− efflux. This is reminiscent of a partial exchanger cycle, suggesting that the ClC-2 channel evolved from its transporter counterparts. PMID:19153159
ERIC Educational Resources Information Center
Hisle, W. Lee; And Others
Designed by Austin Community College's (ACC's) Learning Resource Services (LRS) Management Team, this plan explores the development of the LRS in preparation for the 1989 closure of the college's Ridgeview (RDV) campus, and the opening of the Northridge (NRG) and Riverside (RVS) campuses. First, the plan's executive summary lays out…
Güvenç, Osman; Saygı, Murat; Demir, İbrahim Halil; Ödemiş, Ender
2017-06-01
Patients with wide patent ductus arteriosus and significant pulmonary hypertension not treated in time constitute a significant problem for cardiologists. For these patients, tests that could aid in decision-making for further planning include reversibility and balloon occlusion tests performed in the catheterization laboratory. Devices developed for the closure of ductus as well as different devices with off-label use may be employed in patients scheduled for transcatheter occlusion. When result of reversibility test is borderline positive, the use of fenestrated device may be applicable for selected patients. Presently described is case of a 10-year-old patient with Down syndrome who had a wide ductus and systemic pulmonary hypertension. Transcatheter closure procedure was performed with off-label use of a fenestrated muscular ventricular septal defect occluder device.
A Call for Research on Planned vs. Unplanned Suicidal Behavior
ERIC Educational Resources Information Center
Conner, Kenneth R.
2004-01-01
Unplanned acts of suicidal behavior involve little preparation or forethought whereas planned acts may be carefully conceived and implemented. Planned acts are associated with greater depression, hopelessness, and lethality, but there are meager data on other factors associated with planning. The prevention of planned and unplanned acts may…
Boyd, Matt; Baker, Michael G; Mansoor, Osman D; Kvizhinadze, Giorgi; Wilson, Nick
2017-01-01
Countries are well advised to prepare for future pandemic risks (e.g., pandemic influenza, novel emerging agents or synthetic bioweapons). These preparations do not typically include planning for complete border closure. Even though border closure may not be instituted in time, and can fail, there might still plausible chances of success for well organized island nations. To estimate costs and benefits of complete border closure in response to new pandemic threats, at an initial proof-of-concept level. New Zealand was used as a case-study for an island country. An Excel spreadsheet model was developed to estimate costs and benefits. Case-study specific epidemiological data was sourced from past influenza pandemics. Country-specific healthcare cost data, valuation of life, and lost tourism revenue were imputed (with lost trade also in scenario analyses). For a new pandemic equivalent to the 1918 influenza pandemic (albeit with half the mortality rate, "Scenario A"), it was estimated that successful border closure for 26 weeks provided a net societal benefit (e.g., of NZ$11.0 billion, USD$7.3 billion). Even in the face of a complete end to trade, a net benefit was estimated for scenarios where the mortality rate was high (e.g., at 10 times the mortality impact of "Scenario A", or 2.75% of the country's population dying) giving a net benefit of NZ$54 billion (USD$36 billion). But for some other pandemic scenarios where trade ceased, border closure resulted in a net negative societal value (e.g., for "Scenario A" times three for 26 weeks of border closure-but not for only 12 weeks of closure when it would still be beneficial). This "proof-of-concept" work indicates that more detailed cost-benefit analysis of border closure in very severe pandemic situations for some island nations is probably warranted, as this course of action might sometimes be worthwhile from a societal perspective.
Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below themore » Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action.« less
Code of Federal Regulations, 2011 CFR
2011-07-01
... BASE CLOSURE COMMUNITIES AND COMMUNITY ASSISTANCE-COMMUNITY REDEVELOPMENT AND HOMELESS ASSISTANCE § 176... Liability Act (42 U.S.C. 9601 et seq.). Communities in the vicinity of the installation. The communities... serving in that capacity, the communities in the vicinity of the installation are deemed to be those...
Code of Federal Regulations, 2010 CFR
2010-07-01
... BASE CLOSURE COMMUNITIES AND COMMUNITY ASSISTANCE-COMMUNITY REDEVELOPMENT AND HOMELESS ASSISTANCE § 176... Liability Act (42 U.S.C. 9601 et seq.). Communities in the vicinity of the installation. The communities... serving in that capacity, the communities in the vicinity of the installation are deemed to be those...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2013-01-17
This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): · CAU 90, Area 2 Bitcutter Containment · CAU 91, Area 3 U-3fi Injection Well · CAU 92, Area 6 Decon Pond Facility · CAU 110, Area 3 WMD U-3ax/bl Crater · CAU 111, Area 5 WMD Retired Mixed Waste Pits · CAU 112, Area 23 Hazardous Waste Trenches This report covers fiscal year 2012 (October 2011–September 2012).
NIMROD Modeling of Sawtooth Modes Using Hot-Particle Closures
NASA Astrophysics Data System (ADS)
Kruger, Scott; Jenkins, T. G.; Held, E. D.; King, J. R.
2015-11-01
In DIII-D shot 96043, RF heating gives rise to an energetic ion population that alters the sawtooth stability boundary, replacing conventional sawtooth cycles by longer-period, larger-amplitude `giant sawtooth' oscillations. We explore the use of particle-in-cell closures within the NIMROD code to numerically represent the RF-induced hot-particle distribution, and investigate the role of this distribution in determining the altered mode onset threshold and subsequent nonlinear evolution. Equilibrium reconstructions from the experimental data are used to enable these detailed validation studies. Effects of other parameters on the sawtooth behavior, such as the plasma Lundquist number and hot-particle beta-fraction, are also considered. The fast energetic particles present many challenges for the PIC closure. We review new algorithm and performance improvements to address these challenges, and provide a preliminary assessment of the efficacy of the PIC closure versus a continuum model for energetic particle modeling. We also compare our results with those of, and discuss plans for a more complete validation campaign for this discharge. Supported by US Department of Energy via the SciDAC Center for Extended MHD Modeling (CEMM).
Bhatla, Puneet; Tretter, Justin T; Ludomirsky, Achi; Argilla, Michael; Latson, Larry A; Chakravarti, Sujata; Barker, Piers C; Yoo, Shi-Joon; McElhinney, Doff B; Wake, Nicole; Mosca, Ralph S
2017-01-01
Rapid prototyping facilitates comprehension of complex cardiac anatomy. However, determining when this additional information proves instrumental in patient management remains a challenge. We describe our experience with patient-specific anatomic models created using rapid prototyping from various imaging modalities, suggesting their utility in surgical and interventional planning in congenital heart disease (CHD). Virtual and physical 3-dimensional (3D) models were generated from CT or MRI data, using commercially available software for patients with complex muscular ventricular septal defects (CMVSD) and double-outlet right ventricle (DORV). Six patients with complex anatomy and uncertainty of the optimal management strategy were included in this study. The models were subsequently used to guide management decisions, and the outcomes reviewed. 3D models clearly demonstrated the complex intra-cardiac anatomy in all six patients and were utilized to guide management decisions. In the three patients with CMVSD, one underwent successful endovascular device closure following a prior failed attempt at transcatheter closure, and the other two underwent successful primary surgical closure with the aid of 3D models. In all three cases of DORV, the models provided better anatomic delineation and additional information that altered or confirmed the surgical plan. Patient-specific 3D heart models show promise in accurately defining intra-cardiac anatomy in CHD, specifically CMVSD and DORV. We believe these models improve understanding of the complex anatomical spatial relationships in these defects and provide additional insight for pre/intra-interventional management and surgical planning.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pieper, Claus Christian, E-mail: claus.christian.pieper@ukb.uni-bonn.de; Thomas, Daniel, E-mail: daniel.thomas@ukb.uni-bonn.de; Nadal, Jennifer, E-mail: jennifer.nadal@ukb.uni-bonn.de
PurposeTo intra-individually compare discomfort levels and patient satisfaction after arterial access closure using the ExoSeal{sup ®} vascular closure device (VCD) and manual compression (MC) in a prospective study design.MethodsPatients undergoing two planned interventions from 07/2013 to 09/2014 could participate in the study. Access closure was performed with an ExoSeal{sup ®}-VCD in one and MC in the other intervention. Patients were clinically and sonographically examined and were given questionnaires 1 day after intervention [groin- and back-pain during bedrest (100-point visual analog scale; 0: no pain); comfortability of bedrest (10-point Likert scale, 1: comfortable), satisfaction with closure (10-point Likert scale, 1: very satisfied)].more » Results were analyzed in a cross-over design.Results48 patients (29 male, median age 62.5 (32–88) years) were included. An ExoSeal{sup ®}-VCD was used first in 25 cases. As four of these subsequently refused MC as second intervention, data from 44 patients could be analyzed. All closures were technically successful (successful device deployment) without major complications. Groin- and back-pain after VCD-use/MC was 0 (0–15) vs. 10 (0–80) and 0 (0–75) vs. 25 (0–90), respectively (p < 0.0001). Bedrest after VCD-use was more comfortable than after MC [1 (range 1–7) vs. 6 (2–10); p < 0.0001]. Satisfaction with the closure procedure and with the intervention in general was higher after VCD-use compared to MC [1 (1–3) vs. 5 (2–10) and 1 (1–2) vs. 2 (1–4), respectively; p < 0.0001].ConclusionIntra-individual comparison showed pain levels and discomfort to be significantly lower after ExoSeal{sup ®} use compared to MC. VCD closure was associated with higher satisfaction both with the closure itself and with the intervention in general.« less
75 FR 70916 - Surplus Properties; Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-19
... DEPARTMENT OF DEFENSE Department of the Army Surplus Properties; Notice AGENCY: Department of the... agencies and Department of Defense components. This Notice amends the Notice published in the Federal... with the Defense Base Closure and Realignment Act of 1990, Public Law 101-510, as amended, and the 2005...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klein, Thomas; Patterson, Russell; Camphouse, Chris
There are two primary regulatory requirements for Panel Closures at the Waste Isolation Pilot Plant (WIPP), the nation's only deep geologic repository for defense related Transuranic (TRU) and Mixed TRU waste. The Federal requirement is through 40 CFR 191 and 194, promulgated by the U.S. Environmental Protection Agency (EPA). The state requirement is regulated through the authority of the Secretary of the New Mexico Environment Department (NMED) under the New Mexico Hazardous Waste Act (HWA), New Mexico Statutes Annotated (NMSA) 1978, chap. 74-4-1 through 74-4-14, in accordance with the New Mexico Hazardous Waste Management Regulations (HWMR), 20.4.1 New Mexico Annotatedmore » Code (NMAC). The state regulations are implemented for the operational period of waste emplacement plus 30 years whereas the federal requirements are implemented from the operational period through 10,000 years. The 10,000 year federal requirement is related to the adequate representation of the panel closures in determining long-term performance of the repository. In Condition 1 of the Final Certification Rulemaking for 40 CFR Part 194, the EPA required a specific design for the panel closure system. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has requested, through the Planned Change Request (PCR) process, that the EPA modify Condition 1 via its rulemaking process. The DOE has also requested, through the Permit Modification Request (PMR) process, that the NMED modify the approved panel closure system specified in Permit Attachment G1. The WIPP facility is carved out of a bedded salt formation 655 meters below the surface of southeast New Mexico. Condition 1 of the Final Certification Rulemaking specifies that the waste panels be closed using Option D which is a combination of a Salado mass concrete (SMC) monolith and an isolation/explosion block wall. The Option D design was also accepted as the panel closure of choice by the NMED. After twelve years of waste handling operations and a greater understanding of the waste and the behavior of the underground salt formation, the DOE has established a revised panel closure design. This revised design meets both the short-term NMED Permit requirements for the operational period, and also the Federal requirements for long-term repository performance. This new design is simpler, easier to construct and has less of an adverse impact on waste disposal operations than the originally approved Option D design. The Panel Closure Redesign is based on: (1) the results of in-situ constructability testing performed to determine run-of-mine salt reconsolidation parameters and how the characteristics of the bedded salt formation affect these parameters and, (2) the results of air flow analysis of the new design to determine that the limit for the migration of Volatile Organic Compounds (VOCs) will be met at the compliance point. Waste panel closures comprise a repository feature that has been represented in WIPP performance assessment (PA) since the original Compliance Certification Application of 1996. Panel closures are included in WIPP PA models principally because they are a part of the disposal system, not because they play a substantive role in inhibiting the release of radionuclides to the outside environment. The 1998 rulemaking that certified WIPP to receive transuranic waste placed conditions on the panel closure design to be implemented in the repository. The revised panel closure design, termed the Run-of-Mine (ROM) Panel Closure System (ROMPCS), is comprised of 30.48 meters of ROM salt with barriers at each end. The ROM salt is generated from ongoing mining operations at the WIPP and may be compacted and/or moistened as it is emplaced in a panel entry. The barriers consist of bulkheads, similar to those currently used in the panels as room closures. A WIPP performance assessment has been completed that incorporates the ROMPCS design into the representation of the repository, and compares repository performance to that achieved with the approved Option D design. Several key physical processes and rock mechanics principles are incorporated into the performance assessment. First, creep closure of the salt rock surrounding a panel entry results in consolidation of the ROM salt emplaced in the entry. Eventually, the ROM salt comprising the ROMPCS will approach a condition similar to intact salt. As the ROM salt reaches higher fractional densities during consolidation, back stress will be imposed on the surrounding rock mass leading to eventual healing of the disturbed rock zone above and below the panel closure. Healing of the disturbed rock zone above and below the ROMPCS reduces the porosity and permeability in those areas. Analysis of the new design demonstrates that: (1) the WIPP continues to meet regulatory compliance requirements when the ROMPCS design is implemented instead of Option D, and (2) there is no impact on the short-term effectiveness of the panel closure to limit the concentration of VOCs at the WIPP site boundary to a fraction of the health-based exposure limits (HBLs) during the operational period. (authors)« less
Elements of a Plan-Based Theory of Speech Acts. Technical Report No. 141.
ERIC Educational Resources Information Center
Cohen, Philip R.; Perrault, C. Raymond
This report proposes that people often plan their speech acts to affect their listeners' beliefs, goals, and emotional states and that such language use can be modeled by viewing speech acts as operators in a planning system, allowing both physical and speech acts to be integrated into plans. Methodological issues of how speech acts should be…
Starting at the End When Planning for Base Closure
2016-05-17
order-style mes- sages with all personnel on the base, including contractors , to ensure that everyone was aware of drawdown requirements and could...Shank All” on both the Nonsecure Internet Protocol Rout- er Network, which was mainly used for National Guard Soldiers and contractors , and the...in attendance. Manage Contractors Effectively Contractors were the logistics backbone of the TB, so a great deal of deliberate planning was
Why do nursing homes close? An analysis of newspaper articles.
Fisher, Andrew; Castle, Nicholas
2012-01-01
Using Non-numerical Unstructured Data Indexing Searching and Theorizing (NUD'IST) software to extract and examine keywords from text, the authors explored the phenomenon of nursing home closure through an analysis of 30 major-market newspapers over a period of 66 months (January 1, 1999 to June 1, 2005). Newspaper articles typically represent a careful analysis of staff impressions via interviews, managerial perspectives, and financial records review. There is a current reliance on the synthesis of information from large regulatory databases such as the Online Survey Certification And Reporting database, the California Office of Statewide Healthcare Planning and Development database, and Area Resource Files. Although such databases permit the construction of studies capable of revealing some reasons for nursing home closure, they are hampered by the confines of the data entered. Using our analysis of newspaper articles, the authors are able to add further to their understanding of nursing home closures.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-14
... is being prepared under the Endangered Species Act of 1973, as amended, and the California Natural Community Conservation Planning Act. The BRCP addresses State and Federal endangered species compliance... conservation plan pursuant to the federal Endangered Species Act (Act), and a natural community conservation...
ERIC Educational Resources Information Center
Stephens, Dawn L.; Collins, Michael D.; Dodder, Richard A.
2005-01-01
Recent legislation, especially the Americans with Disabilities Act in 1990, generated the closure of institutions for people with disabilities and inclusion into community residences and employment. It has been well documented that individuals with developmental disabilities often experience difficulties with employment including both obtaining…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
..., closures and coils and from graphic arts operations and the provision of sampling and testing facilities...; SDCAPCD Rule 67.16, Metal Container, Graphic Arts Operations; MBUAPCD Rule 205, Provision of Sampling and...
Fort Ord Redevelopment: Coordinating Transportation and Land Use Planning
DOT National Transportation Integrated Search
1999-01-01
The closure of military bases and conversion to civilian land uses is a challenging task faced by many small communities throughout the nation. Fort Ord is located in Monterey County, California and encompasses 28,000 acres of reprogrammed property. ...
9 CFR 318.301 - Containers and closures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... container integrity. Such an examination should be based upon a statistical sampling plan. (2) All empty... the establishment and the container plant records are made available to Program employees. Additional...
9 CFR 318.301 - Containers and closures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... container integrity. Such an examination should be based upon a statistical sampling plan. (2) All empty... the establishment and the container plant records are made available to Program employees. Additional...
9 CFR 318.301 - Containers and closures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... container integrity. Such an examination should be based upon a statistical sampling plan. (2) All empty... the establishment and the container plant records are made available to Program employees. Additional...
9 CFR 318.301 - Containers and closures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... container integrity. Such an examination should be based upon a statistical sampling plan. (2) All empty... the establishment and the container plant records are made available to Program employees. Additional...
Sampling and analyses plan for tank 103 at the 219-S waste handling facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
FOWLER, K.D.
1999-06-23
This document describes the sampling and analysis activities associated with taking a Resource Conservation and Recovery Act (RCRA) protocol sample of the waste from Tank 103 at the 21 9-S Waste Handling Facility treatment storage, andlor disposal (TSD) unit at the 2224 Laboratory complex. This sampling and analyses is required based on negotiations between the State of Washington Department of Ecology (Ecology) and the Department of Energy, Richland Operations, (RL) in letters concerning the TPA Change Form M-32-98-01. In a letter from George H. Sanders, RL to Moses N. Jaraysi, Ecology, dated January 28,1999, it was noted that ''Prior tomore » the Tank 103 waste inventory transfer, a RCRA protocol sample of the waste will be obtained and tested for the constituents contained on the Part A, Form 3 Permit Application for the 219-S Waste Handling Facility.'' In the April 2, 1999 letter, from Brenda L. Becher-Khaleel, Ecology to James, E. Rasmussen, RL, and William O. Adair, FDH, Ecology states that the purpose of these analyses is to provide information and justification for leaving Tank 103 in an isolated condition in the 2194 TSD unit until facility closure. The data may also be used at some future date in making decisions regarding closure methodology for Tank 103. Ecology also notes that As Low As Reasonably Achievable (ALARA) concerns may force deviations from some SW-846 protocol. Every effort will be made to accommodate requirements as specified. Deviations from SW-846 will be documented in accordance with HASQARD.« less
Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) andmore » the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was implemented. (6) At CAS 09-23-01, Area 9 Gravel Gertie, a UR was implemented. (7) At CAS 09-34-01, Underground Detection Station, no work was performed.« less
B Plant Complex preclosure work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADLER, J.G.
1999-02-02
This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less
Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASsmore » 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-02-24
This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.
Future financial viability of rural hospitals.
Stensland, Jeffrey; Moscovice, Ira; Christianson, Jon
2002-01-01
Policymakers are concerned that some rural hospitals have suffered significant losses under the Balanced Budget Act (BBA) of 1997 and that access to inpatient and emergency care may be at risk. This article projects that the median total profit margin for rural hospitals will fall from 4 percent in 1997 to between 2.5 and 3.7 percent after the BBA, Balanced Budget Refinement Act (BBRA) of 1999, and Benefits Improvement and Protection Act (BIPA) of 2000 are fully implemented in 2004. The Critical Access Hospital (CAH) Program is expected to prevent reductions in inpatient and outpatient prospective payments from causing an increase in rural hospital closures.
Geospatial Thinking of Information Professionals
ERIC Educational Resources Information Center
Bishop, Bradley Wade; Johnston, Melissa P.
2013-01-01
Geospatial thinking skills inform a host of library decisions including planning and managing facilities, analyzing service area populations, facility site location, library outlet and service point closures, as well as assisting users with their own geospatial needs. Geospatial thinking includes spatial cognition, spatial reasoning, and knowledge…
Crash analysis of I-64 closure in St. Louis county.
DOT National Transportation Integrated Search
2011-08-01
On January 2, 2008, the Missouri Department of Transportation (MoDOT) closed significant portions of Missouri Interstate 64 : (I-64) in St. Louis County for reconstruction. During the planning stages of this project, the proposal to close all lanes o...
Service in the snow. Maintaining care in rural California.
Elliott, P
1993-08-01
The amount of snow that falls in the Sierras is proof that all is not sunshine in rural northeastern California. Isolation and road closures were just two of the challenges that one home care agency was able to surmount with careful planning.
75 FR 13275 - Environmental Impact Statements and Regulations; Availability of EPA Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... Designation, Motorized Travel Management, (Formerly Motorized Route Designation), Implementation, Siskiyou... travel management planning process and season of use and wet weather closures, and recommended the action... Yosemite Institute Environment Education Campus, Implementation, Mariposa County, CA. Summary: No formal...
Chen, Ya-Bin; Xiao, Wei; Li, Ming; Zhang, Yan; Yang, Yang; Hu, Jian-Sheng; Luo, Kai-Jun
2016-05-01
The hemichannel and gap junction channel are major portals for the release of factors responsible for the effects of apoptotic cells on the spread of apoptosis to neighboring cells and apoptotic corpse clearance, typically by phagocytes. The N-terminal cytoplasmic domain in the connexins, gap junction proteins in vertebrate, has been implicated in regulating channel closure. However, little is known about how the hemichannel close responds to apoptotic signaling transduction leading to the reduction of neighboring cellular apoptosis in an invertebrate. An insect Bac-to-Bac expression system, pFastBac(TM) HT A, allows us to construct an N-terminally elongated SpliInx2 (Nte-Inx2) and SpliInx3 (Nte-Inx3). Here, we demonstrated that recombinant baculovirus Bac-Nte-Inx2 (reBac-Net-Inx2) and Bac-Nte-Inx3 (reBac-Nte-Inx3) closed the endogenous hemichannel on the Sf9 cell surface. Importantly, primary baculovirus infections significantly caused early apoptosis, and this apoptosis was reduced by hemichannel-closed Sf9 cells at 24-h post-infection (PI). Although N-terminal-elongated residue led to the increase in the phosphorylated sites in both Nte-Inx2 and Nte-Inx3 and an additional transmembrane domain in Nte-Inx3, both the proteins localized on the cell surface, suggesting Nte-Inxs proteins could mediate hemichannel closure. Further supporting evidence showed that hemichannel closure was dependent on N-Inxs expressed by baculovirus polyhedrin promoter, which began to express at 18-24 h PI. These results identify an unconventional function of N-terminal-elongated innexins that could act as a plug to manipulate hemichannel closure and provide a mechanism connecting the effect of hemichannel closure directly to apoptotic signaling transduction from intracellular to extracellular compartment. © 2016 Wiley Periodicals, Inc.
Efficiently enforcing artisanal fisheries to protect estuarine biodiversity.
Duarte de Paula Costa, Micheli; Mills, Morena; Richardson, Anthony J; Fuller, Richard A; Muelbert, José H; Possingham, Hugh P
2018-06-26
Artisanal fisheries support millions of livelihoods worldwide, yet ineffective enforcement can allow for continued environmental degradation due to overexploitation. Here, we use spatial planning to design an enforcement strategy for a pre-existing spatial closure for artisanal fisheries considering climate variability, existing seasonal fishing closures, representative conservation targets and enforcement costs. We calculated enforcement cost in three ways, based on different assumptions about who could be responsible for monitoring the fishery. We applied this approach in the Patos Lagoon estuary (Brazil), where we found three important results. First, spatial priorities for enforcement were similar under different climate scenarios. Second, we found that the cost and percentage of area enforced varied among scenarios tested by the conservation planning analysis, with only a modest increase in budget needed to incorporate climate variability. Third, we found that spatial priorities for enforcement depend on whether enforcement is carried out by a central authority or by the community itself. Here, we demonstrated a method that can be used to efficiently design enforcement plans, resulting in the conservation of biodiversity and estuarine resources. Also, cost of enforcement can be potentially reduced when fishers are empowered to enforce management within their fishing grounds. © 2018 by the Ecological Society of America.
Sharma, Mohit; Wakure, Abhijeet
2013-01-01
Most surgical patients end up with a scar and most of these would want at least some improvement in the appearance of the scar. Using sound techniques for wound closure surgeons can, to a certain extent, prevent suboptimal scars. This article reviews the principles of prevention and treatment of suboptimal scars. Surgical techniques of scar revision, i.e., Z plasty, W plasty, and geometrical broken line closure are described. Post-operative care and other adjuvant therapies of scars are described. A short description of dermabrasion and lasers for management of scars is given. It is hoped that this review helps the surgeon to formulate a comprehensive plan for management of scars of these patients. PMID:24516292
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-12
...: 16 U.S.C. 1801 et seq. Dated: August 7, 2013. Emily H. Menashes, Deputy Director, Office of.../area hotspot closures to the list of measures that can be addressed via framework adjustment. The... in the New England Fishery Management Council's (NEFMC) Amendment 5 to the Atlantic Herring FMP...
Productive Tensions in Youth Participatory Action Research
ERIC Educational Resources Information Center
Kirshner, Ben
2010-01-01
Youth participatory action research (YPAR) brings young people together with adult researchers to identify, study, and act on relevant social problems. In this chapter, the author draws on examples from a recent YPAR project, called Tracing Transitions, whose aim was to study the impact of school closure on students. After defining YPAR in terms…
UNDERGROUND STORAGE TANK SITE CLOSURE USING ACTIVE INTERVENTION FOR SITE CLEANUP
The Clean Air Act Amendments of 1990 mandate seasonal or year-round use of oxygenated compounds in gasoline in certain areas of the country. Methyl t-butyl ether (MtBE) has been the most commonly used oxygenate. However, the use of MtBE has created a significant risk to groundwat...
Minimizing user delay and crash potential through highway work zone planning.
DOT National Transportation Integrated Search
2014-05-01
Lane closures due to highway work zones introduce many challenges to ensuring smooth traffic operations and a : safe environment for drivers and workers. In addition, merging has been found to be one of the most stressful : aspects of driving and a m...
Governing Underfunded Tribal Colleges.
ERIC Educational Resources Information Center
Ambler, Marjane
1996-01-01
Discusses tribal colleges' struggles with lower-than-promised federal appropriations, including difficulties related to governance and planning and the threat of closure. Describes possible alternate means of funding, such as forward funding one year in advance, funding from state governments, and private funding from tribal governments or private…
A historical context of municipal solid waste management in the United States.
Louis, Garrick E
2004-08-01
Municipal solid waste management (MSWM) in the United States is a system comprised of regulatory, administrative, market, technology, and social subcomponents, and can only be understood in the context of its historical evolution. American cities lacked organized public works for street cleaning, refuse collection, water treatment, and human waste removal until the early 1800s. Recurrent epidemics forced efforts to improve public health and the environment. The belief in anticontagionism led to the construction of water treatment and sewerage works during the nineteenth century, by sanitary engineers working for regional public health authorities. This infrastructure was capital intensive and required regional institutions to finance and administer it. By the time attention turned to solid waste management in the 1880s, funding was not available for a regional infrastructure. Thus, solid waste management was established as a local responsibility, centred on nearby municipal dumps. George Waring of New York City organized solid waste management around engineering unit operations; including street sweeping, refuse collection, transportation, resource recovery and disposal. This approach was adopted nationwide, and was managed by City Departments of Sanitation. Innovations such as the introduction of trucks, motorized street sweepers, incineration, and sanitary landfill were developed in the following decades. The Resource Conservation and Recovery Act of 1976 (RCRA), is the defining legislation for MSWM practice in America today. It forced the closure of open dumps nationwide, and required regional planning for MSWM. The closure of municipal dumps caused a 'garbage crisis' in the late 1980s and early 1990s. Private companies assumed an expanded role in MSWM through regional facilities that required the transportation of MSW across state lines. These transboundary movements of MSW created the issue of flow control, in which the US Supreme Court affirmed the protection of garbage under the Commerce Clause of the Constitution. Thus MSWM in America today is largely managed by municipalities, and operated by a relatively small number of private companies. It consists of a mixture of landfill, incineration, recycling, and composting, and is regulated under RCRA, the Clean Air Act and other related federal and state laws.
Flower opening and closure: an update.
van Doorn, Wouter G; Kamdee, Chanattika
2014-11-01
This review is an update of a 2003 review (Journal of Experimental Botany 54,1801-1812) by the same corresponding author. Many examples of flower opening have been recorded using time-lapse photography, showing its velocity and the required elongation growth. Ethylene regulates flower opening, together with at least gibberellins and auxin. Ethylene and gibberellic acid often promote and inhibit, respectively, the expression of DELLA genes and the stability of DELLA proteins. DELLA results in growth inhibition. Both hormones also inhibited and promoted, respectively, the expression of aquaporin genes required for cell elongation. Arabidopsis miRNA319a mutants exhibited narrow and short petals, whereby miRNA319a indirectly regulates auxin effects. Flower opening in roses was controlled by a NAC transcription factor, acting through miRNA164. The regulatory role of light and temperature, in interaction with the circadian clock, has been further elucidated. The end of the life span in many flowers is determined by floral closure. In some species pollination resulted in earlier closure of turgid flowers, compared with unpollinated flowers. It is hypothesized that this pollination-induced effect is only found in flowers in which closure is regulated by ethylene. © The Author 2014. Published by Oxford University Press on behalf of the Society for Experimental Biology. All rights reserved. For permissions, please email: journals.permissions@oup.com.
ERIC Educational Resources Information Center
Connecticut State Dept. of Community Affairs, Hartford.
This report of the Connecticut Community Development Action Plan (CDAP) contains a brochure on how to plan and execute a CDAP, detailed guidelines for municipalities, the Community Development Act (Public Act 522) and related legislation (Public Acts 768 and 760), and provisions of 20 other public acts. Interpersonal communication, citizen…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NV
2002-11-12
This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, in accordance with the Federal Facility Agreement and Consent Order. This CAU is located in Areas 3 and 20 of the Nevada Test Site (NTS) approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 356 consists of seven Corrective Action Sites (CASs): 03-04-01, Area 3 Change House Septic System; 03-09-01, Mud Pit Spill Over; 03-09-03, Mud Pit; 03-09-04, Mud Pit; 03-09-05, Mud Pit; 20-16-01, Landfill; and 20-22-21, Drums. This CR identifies and rationalizes the U.S. Department of Energy (DOE), Nationalmore » Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no further corrective action and closure in place is deemed necessary for CAU 356. This recommendation is based on the results of field investigation/closure activities conducted November 20, 2001, through January 3, 2002, and March 11 to 14, 2002. These activities were conducted in accordance with the Streamlined Approach for Environmental Restoration Plan (SAFER) for CAU 356. For CASs 03-09-01, 03-09-03, 20-16-01, and 22-20-21, analytes detected in soil during the corrective action investigation were evaluated against Preliminary Action Levels (PALs) and it was determined that no Contaminants of Concern (COCs) were present. Therefore, no further action is necessary for the soil at these CASs. For CASs 03-04-01, 03-09-04, and 03-09-05, analytes detected in soil during the corrective action investigation were evaluated against PALs and identifies total petroleum hydrocarbons (TPHs) and radionuclides (i.e., americium-241 and/or plutonium 239/240) as COCs. The nature, extent, and concentration of the TPH and radionuclide COCs were bounded by sampling and shown to be relatively immobile. Therefore, closure in place is recommended for these CASs in CAU 356. Further, use restrictions are not required at this CAU beyond the NTS use restrictions identified in the SAFER Plan. In addition, the septic tank associated with CAU 356 will be closed in accordance with applicable regulations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Layton, Mark H.
2012-07-01
The F-Area Tank Farm (FTF) is owned by the U.S. Department of Energy and operated by Savannah River Remediation, LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF is in the north-central portion of the SRS and occupies approximately 22 acres within F-Area. The FTF is an active radioactive waste storage facility consisting of 22 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. An FTF Performance Assessment (PA) was prepared to support the eventual closure of the FTF underground radioactive waste tanks and ancillary equipment. The PA providesmore » the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified below for final closure of FTF. The FTank Farm is subject to a state industrial waste water permit and Federal Facility Agreement. Closure documentation will include an F-Tank Farm Closure Plan and tank-specific closure modules utilizing information from the performance assessment. For this reason, the State of South Carolina and the Environmental Protection Agency must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. The projected waste tank inventories in the FTF PA provide reasonably bounding FTF inventory projections while taking into account uncertainties in the effectiveness of future tank cleaning technologies. As waste is removed from the FTF waste tanks, the residual contaminants will be sampled and the remaining residual inventory is characterized. In this manner, tank specific data for the tank inventories at closure will be available to supplement the waste tank inventory projections currently used in the FTF PA. For FTF, the new tank specific data will be evaluated through the Special Analysis process. The FTF Special Analyses process will be utilized to evaluate information regarding the final residual waste that will be grouted in place in the FTF Tanks and assess the potential impact the new inventory information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. The purpose of this paper is to discuss the Special Analysis process and share insights gained while implementing this process. An example of an area of interest in the revision process is balancing continuous improvement versus configuration control of agreed upon methodologies. Other subjects to be covered include: 1) defining the scope of the revisions included in the Special Analysis, 2) determining which PA results should be addressed in the Special Analysis, and 3) deciding whether the Special Analysis should utilize more qualitative or quantitative assessments. For the SRS FTF, an FTF PA has been prepared to provide the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of FTF. The FTF Special Analyses process will be utilized to evaluate the impact new information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. In preparing SAs, it is crucial that the scope of the SA be well defined within the SA, since the specific scope will vary from SA to SA. Since the SAs are essentially addendums to the PA, the SA scope should utilize the PA as the baseline from which the SA scope is defined. The SA needs to focus on evaluating the change associated with the scope, and not let other changes interfere with the ability to perform that evaluation by masking the impact of the change. In preparing the SA, it is also important to let the scope determine whether the Special Analysis should utilize more qualitative or quantitative assessments and also which results from the PA should be addressed in the Special Analysis. These decisions can vary from SA and should not be predetermined. (author)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shott, Gregory
2014-03-01
The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2010-07-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mudmore » Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation for closure of the remaining CASs in CAU 544. This will be presented in a closure report (CR) that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on April 27, 2010, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 544. The DQO process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the final action levels (FALs) leading to an NFA declaration, (2) characterization of the nature and extent of contamination leading to closure in place with use restrictions, (3) clean closure by remediation and verification, (4) closure in place with use restrictions with no investigation if CASs are in crater areas that have been determined to be unsafe to enter, or (5) NFA if the mud pit CAS meets the criteria established during the CAUs 530–535 SAFER investigation. The following summarizes the SAFER activities that will support the closure of CAU 544: • Perform visual inspection of all CASs. • Perform site preparation activities (e.g., utilities clearances, construction of temporary site exclusion zones). • Removal of easily managed, nonhazardous, and nonradioactive debris, including vegetation (e.g., tumbleweeds), at various CASs that interfere with sampling, if required to inspect soil surface or collect soil sample. • Collect environmental samples from designated target populations (e.g., mud pits, cellars, stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • If no COCs are present at a CAS, establish NFA as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. • If a COC is present at a CAS, either - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. • Confirm the preferred closure option is sufficient to protect human health and the environment.« less
Chemical Waste Landfill Annual Post-Closure Care Report Calendar Year 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mitchell, Michael Marquand; Little, Bonnie Colleen
The CWL is a 1.9-acre remediated interim status landfill located in the southeastern corner of SNL/NM Technical Area III (Figures 2-1 and 2-2) undergoing post-closure care in accordance with the PCCP (NMED October 2009 and subsequent revisions). From 1962 until 1981, the CWL was used for the disposal of chemical and solid waste generated by SNL/NM research activities. Additionally, a small amount of radioactive waste was disposed of during the operational years. Disposal of liquid waste in unlined pits and trenches ended in 1981, and after 1982 all liquid waste disposal was terminated. From 1982 through 1985, only solid wastemore » was disposed of at the CWL, and after 1985 all waste disposal ended. The CWL was also used as a hazardous waste drum-storage facility from 1981 to 1989. A summary of the CWL disposal history is presented in the Closure Plan (SNL/NM December 1992) along with a waste inventory based upon available disposal records and information.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister and Patrick Matthews
2012-11-01
The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: • 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. • 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. • 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. • 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CRmore » is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.« less
Penney, Andrew J.; Guinotte, John M.
2013-01-01
United Nations General Assembly Resolution 61/105 on sustainable fisheries (UNGA 2007) establishes three difficult questions for participants in high-seas bottom fisheries to answer: 1) Where are vulnerable marine systems (VMEs) likely to occur?; 2) What is the likelihood of fisheries interaction with these VMEs?; and 3) What might qualify as adequate conservation and management measures to prevent significant adverse impacts? This paper develops an approach to answering these questions for bottom trawling activities in the Convention Area of the South Pacific Regional Fisheries Management Organisation (SPRFMO) within a quantitative risk assessment and cost : benefit analysis framework. The predicted distribution of deep-sea corals from habitat suitability models is used to answer the first question. Distribution of historical bottom trawl effort is used to answer the second, with estimates of seabed areas swept by bottom trawlers being used to develop discounting factors for reduced biodiversity in previously fished areas. These are used in a quantitative ecological risk assessment approach to guide spatial protection planning to address the third question. The coral VME likelihood (average, discounted, predicted coral habitat suitability) of existing spatial closures implemented by New Zealand within the SPRFMO area is evaluated. Historical catch is used as a measure of cost to industry in a cost : benefit analysis of alternative spatial closure scenarios. Results indicate that current closures within the New Zealand SPRFMO area bottom trawl footprint are suboptimal for protection of VMEs. Examples of alternative trawl closure scenarios are provided to illustrate how the approach could be used to optimise protection of VMEs under chosen management objectives, balancing protection of VMEs against economic loss to commercial fishers from closure of historically fished areas. PMID:24358162
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2008-04-01
Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activitiesmore » were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.« less
Penney, Andrew J; Guinotte, John M
2013-01-01
United Nations General Assembly Resolution 61/105 on sustainable fisheries (UNGA 2007) establishes three difficult questions for participants in high-seas bottom fisheries to answer: 1) Where are vulnerable marine systems (VMEs) likely to occur?; 2) What is the likelihood of fisheries interaction with these VMEs?; and 3) What might qualify as adequate conservation and management measures to prevent significant adverse impacts? This paper develops an approach to answering these questions for bottom trawling activities in the Convention Area of the South Pacific Regional Fisheries Management Organisation (SPRFMO) within a quantitative risk assessment and cost : benefit analysis framework. The predicted distribution of deep-sea corals from habitat suitability models is used to answer the first question. Distribution of historical bottom trawl effort is used to answer the second, with estimates of seabed areas swept by bottom trawlers being used to develop discounting factors for reduced biodiversity in previously fished areas. These are used in a quantitative ecological risk assessment approach to guide spatial protection planning to address the third question. The coral VME likelihood (average, discounted, predicted coral habitat suitability) of existing spatial closures implemented by New Zealand within the SPRFMO area is evaluated. Historical catch is used as a measure of cost to industry in a cost : benefit analysis of alternative spatial closure scenarios. Results indicate that current closures within the New Zealand SPRFMO area bottom trawl footprint are suboptimal for protection of VMEs. Examples of alternative trawl closure scenarios are provided to illustrate how the approach could be used to optimise protection of VMEs under chosen management objectives, balancing protection of VMEs against economic loss to commercial fishers from closure of historically fished areas.
Effect of the Family and Medical Leave Act on the operation of cafeteria plans. Final regulations.
2001-10-17
This document contains final regulations relating to cafeteria plans that reflect changes made by the Family and Medical Leave Act of 1993 (Act). The final regulations provide the public with guidance needed to comply with the Act and affect employees who participate in cafeteria plans.
Braunack-Mayer, Annette; Tooher, Rebecca; Collins, Joanne E; Street, Jackie M; Marshall, Helen
2013-04-15
During the 2009 H1N1 influenza pandemic, Australian public health officials closed schools as a strategy to mitigate the spread of the infection. This article examines school communities' understanding of, and participation in, school closures and the beliefs and values which underpinned school responses to the closures. We interviewed four school principals, 25 staff, 14 parents and 13 students in five schools in one Australian city which were either fully or partially closed during the 2009 H1N1 pandemic. Drawing on Thompson et al's ethical framework for pandemic planning, we show that considerable variation existed between and within schools in their attention to ethical processes and values. In all schools, health officials and school leaders were strongly committed to providing high quality care for members of the school community. There was variation in the extent to which information was shared openly and transparently, the degree to which school community members considered themselves participants in decision-making, and the responsiveness of decision-makers to the changing situation. Reservations were expressed about the need for closures and quarantine and there was a lack of understanding of the rationale for the closures. All schools displayed a strong duty of care toward those in need, although school communities had a broader view of care than that of the public health officials. Similarly, there was a clear understanding of and commitment to protect the public from harm and to demonstrate responsible stewardship. We conclude that school closures during an influenza pandemic represent both a challenge for public health officials and a litmus test for the level of trust in public officials, government and the school as institution. In our study, trust was the foundation upon which effective responses to the school closure were built. Trust relations within the school were the basis on which different values and beliefs were used to develop and justify the practices and strategies in response to the pandemic.
Xhepa, Erion; Byrne, Robert A; Schulz, Stefanie; Helde, Sandra; Gewalt, Senta; Cassese, Salvatore; Linhardt, Maryam; Ibrahim, Tareq; Mehilli, Julinda; Hoppe, Katharina; Grupp, Katharina; Kufner, Sebastian; Böttiger, Corinna; Hoppmann, Petra; Burgdorf, Christof; Fusaro, Massimiliano; Ott, Ilka; Schneider, Simon; Hengstenberg, Christian; Schunkert, Heribert; Laugwitz, Karl-Ludwig; Kastrati, Adnan
2014-06-01
Vascular closure devices (VCD) have been introduced into clinical practice with the aim of increasing the procedural efficiency and clinical safety of coronary angiography. However, clinical studies comparing VCD and manual compression have yielded mixed results, and large randomised clinical trials comparing the two strategies are missing. Moreover, comparative efficacy studies between different VCD in routine clinical use are lacking. The Instrumental Sealing of ARterial puncture site - CLOSURE device versus manual compression (ISAR-CLOSURE) trial is a prospective, randomised clinical trial designed to compare the outcomes associated with the use of VCD or manual compression to achieve femoral haemostasis. The test hypothesis is that femoral haemostasis after coronary angiography achieved using VCD is not inferior to manual compression in terms of access-site-related vascular complications. Patients undergoing coronary angiography via the common femoral artery will be randomised in a 1:1:1 fashion to receive FemoSeal VCD, EXOSEAL VCD or manual compression. The primary endpoint is the incidence of the composite of arterial access-related complications (haematoma ≥5 cm, pseudoaneurysm, arteriovenous fistula, access-site-related bleeding, acute ipsilateral leg ischaemia, the need for vascular surgical/interventional treatment or documented local infection) at 30 days after randomisation. According to power calculations based on non-inferiority hypothesis testing, enrolment of 4,500 patients is planned. The trial is registered at www.clinicaltrials.gov (study identifier: NCT01389375). The safety of VCD as compared to manual compression in patients undergoing transfemoral coronary angiography remains an issue of clinical equipoise. The aim of the ISAR-CLOSURE trial is to assess whether femoral haemostasis achieved through the use of VCD is non-inferior to manual compression in terms of access-site-related vascular complications.
10 CFR 2.306 - Computation of time.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Hearings § 2.306 Computation of time. (a) In computing any period of time, the day of the act, event, or... where the action or event is to occur, or a day upon which, because of an emergency closure of the Federal government in Washington, DC, NRC Headquarters does not open for business, in which event the...
10 CFR 13.27 - Computation of time.
Code of Federal Regulations, 2014 CFR
2014-01-01
... act, event, or default, and includes the last day of the period, unless it is a Saturday or Sunday, a Federal legal holiday at the place where the action or event is to occur, or a day on which, because of..., in which event it includes the next day that is not a Saturday, Sunday, holiday or emergency closure...
10 CFR 2.306 - Computation of time.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Hearings § 2.306 Computation of time. (a) In computing any period of time, the day of the act, event, or... where the action or event is to occur, or a day upon which, because of an emergency closure of the Federal government in Washington, DC, NRC Headquarters does not open for business, in which event the...
10 CFR 13.27 - Computation of time.
Code of Federal Regulations, 2012 CFR
2012-01-01
... act, event, or default, and includes the last day of the period, unless it is a Saturday or Sunday, a Federal legal holiday at the place where the action or event is to occur, or a day on which, because of..., in which event it includes the next day that is not a Saturday, Sunday, holiday or emergency closure...
10 CFR 13.27 - Computation of time.
Code of Federal Regulations, 2013 CFR
2013-01-01
... act, event, or default, and includes the last day of the period, unless it is a Saturday or Sunday, a Federal legal holiday at the place where the action or event is to occur, or a day on which, because of..., in which event it includes the next day that is not a Saturday, Sunday, holiday or emergency closure...
10 CFR 13.27 - Computation of time.
Code of Federal Regulations, 2011 CFR
2011-01-01
... act, event, or default, and includes the last day of the period, unless it is a Saturday or Sunday, a Federal legal holiday at the place where the action or event is to occur, or a day on which, because of..., in which event it includes the next day that is not a Saturday, Sunday, holiday or emergency closure...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-19
... Cause Statement The Administrative Procedure Act (APA) exempts certain rulemaking from its public notice...)), such as federal lands managed by the Forest Service. Furthermore, the APA allows agencies to promulgate... from public notice and comment rulemaking under the APA (July 24, 1971; 36 FR 13804). Thus, agencies in...
75 FR 19245 - Drawbridge Operation Regulation; Elizabeth River, Eastern Branch, VA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-14
....1007(b) and (c) to facilitate the resurfacing of the bridge roadway, as modified by the temporary... severe or inclement weather occurs, the alternate closure dates will be rescheduled to May 7-10, 2010 and..., Acting Commander, Fifth Coast Guard District. [FR Doc. 2010-8476 Filed 4-13-10; 8:45 am] BILLING CODE...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-27
... (``GVI'') and the Virgin Islands Waste Management Authority (``WMA'') to operate the Bovoni Landfill on... the landfill in accordance with RCRA; (b) upgrade an existing CAA-required landfill gas collection and... tires adjacent to the landfill; (d) implement phased closure of the landfill beginning in 2014; (f...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-14
.... ADDRESSES: The Environmental Assessment (EA) is available by request from: Daniel S. Morris, Acting Regional... the keyword search. Locate the document you wish to comment on from the resulting list and click on the ``Submit a Comment'' icon on the right of that line. Mail: Submit written comments to Daniel S...
21 CFR 212.1 - What are the meanings of the technical terms used in these regulations?
Code of Federal Regulations, 2011 CFR
2011-04-01
... permit the use of a component, container and closure, in-process material, packaging material, or..., and Cosmetic Act, as amended (21 U.S.C. 321 et seq.). Active pharmaceutical ingredient means a... ingredient means any intended component of the PET drug other than the active pharmaceutical ingredient. In...
Assistance to Local Educational Agencies for Defense Dependents' Education ("Update"), February 2014
ERIC Educational Resources Information Center
Department of Defense Education Activity, 2014
2014-01-01
Section 574 of the John Warner National Defense Authorization Act for Fiscal Year 2007, as amended, requires the Secretary of Defense to identify the projected changes in military dependent students by installation as a result of force structure changes, relocation of military units, or the closure or realignment of installations under base…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNVW03500.L12320000.EA0000.LVRDNV190000... Specific Uses of Public Lands in Pershing County, NV AGENCY: Bureau of Land Management, Interior. ACTION... Management Act of 1976 (FLPMA), as amended, the Bureau of Land Management (BLM) Winnemucca District, Black...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... 2010, and both the Scallop Committee and the Council's Scientific and Statistical Committee (SSC... during the final development of Amendment 15 as the statistical areas that have high bycatch of YTF in the scallop fishery. For the GB YTF stock, the closure would be in statistical area 562, which extends...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... Atlantic surfclam and ocean quahog Georges Bank Closure Area to continue testing the safety and efficacy of... research project that has been ongoing since 2006. NMS has made a preliminary determination that the...: http://www.nero.noaa.gov/sfd/clams . This project is a pilot program with the goal of determining if...
Water hammer caused by closure of turbine safety spherical valves
NASA Astrophysics Data System (ADS)
Karadžić, U.; Bergant, A.; Vukoslavčević, P.
2010-08-01
This paper investigates water hammer effects caused by closure of spherical valves against the discharge. During the first phase of modernisation of Perućica high-head hydropower plant (HPP), Montenegro, safety spherical valves (inlet turbine valves) have been refurbished on the first two Pelton turbine units. The valve closure is controlled by the valve actuator (hydraulic servomotor). Because the torque acting on the valve body is dependent on flow conditions the valve closing time may vary significantly for different flow velocities (passive valve). For the passive valve the torques acting on the valve body should be considered in the valve model. The valve closing time results from numerical simulation. On the contrary, for the active valve the valve closing time is assumed prior to simulation. The spherical valve boundary condition is incorporated into the method of characteristics (MOC) algorithm. The staggered (diamond) grid in applying the MOC is used in this paper. The passive valve boundary condition is described by the water hammer equations, the valve equation that relates discharge to pressure head drop and the dynamic equation of the valve body motion (torque equation). The active valve boundary condition is described by the first two equations, respectively. Standard quasi-steady friction model is used for estimating friction losses in plant's tunnel and penstocks. Numerical results using both the active and the passive spherical valve models are compared with results of measurements. It has been found that the influence of flow conditions on the spherical valve closing time is minor for the cases considered. Computed and measured results agree reasonably well.
Ribeiro Junior, Marcelo A F; Barros, Emily Alves; de Carvalho, Sabrina Marques; Nascimento, Vinicius Pereira; Cruvinel Neto, José; Fonseca, Alexandre Zanchenko
2016-01-01
AIM To compare the 3 main techniques of temporary closure of the abdominal cavity, vacuum assisted closure (vacuum-assisted closure therapy - VAC), Bogota bag and Barker technique, in damage control surgery. METHODS After systematic review of the literature, 33 articles were selected to compare the efficiency of the three procedures. Criteria such as cost, infections, capacity of reconstruction of the abdominal wall, diseases associated with the technique, among others were analyzed. RESULTS The Bogota bag and Barker techniques present as advantage the availability of material and low cost, what is not observed in the VAC procedure. The VAC technique is the most efficient, not only because it reduces the tension on the boarders of the lesion, but also removes stagnant fluids and debris and acts at cellular level increasing cell proliferation and division. Bogota bag presents the higher rates of skin laceration and evisceration, greater need for a stent for draining fluids and wash-ups, higher rates of intestinal adhesion to the abdominal wall. The Barker technique presents lack of efficiency in closing the abdominal wall and difficulty on maintaining pressure on the dressing. The VAC dressing can generate irritation and dermatitis when the drape is applied, in addition to pain, infection and bleeding, as well as toxic shock syndrome, anaerobic sepsis and thrombosis. CONCLUSION The VAC technique, showed to be superior allowing a better control of liquid on the third space, avoiding complications such as fistula with small mortality, low infection rate, and easier capability on primary closure of the abdominal cavity. PMID:27648164
DEVELOPMENT OF NEAR-SHORE HYDRODYNAMIC MODELS FOR BEACH CLOSURE FORECASTING IN THE GREAT LAKES
Water quality managers and other planning and decision entities are increasingly calling for up-to-the-minute data on present water quality conditions or forecasts of these data that can be used to adjust or respond to quickly developing activities with environmental implications...
Development Activities on Airbreathing Combined Cycle Engines
NASA Technical Reports Server (NTRS)
McArthur, J. Craig; Lyles, Garry (Technical Monitor)
2000-01-01
Contents include the following: Advanced reusable transportation(ART); aerojet and rocketdyne tests, RBCC focused concept flowpaths,fabricate flight weigh, test select components, document ART project, Istar (Integrated system test of an airbreathing rocket); combined cycle propulsion testbed;hydrocarbon demonstrator tracebility; Istar engine system and vehicle system closure study; and Istar project planning.
The Psychology of a Crisis: An Opportunity To Learn.
ERIC Educational Resources Information Center
Whiting, Peggy P.
1998-01-01
Crisis events may be viewed as expected, sudden, or catastrophic. Survivors have common needs: recognition of loss, soothing of fear, a sense of what happened, expression of feelings, assistance with adjustment, shared closure rituals, and ways to remember. Schools' crisis-response plans should include intervention and postintervention activities…
7 CFR 225.14 - Requirements for sponsor participation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... an unanticipated school closure during the period from October through April (or at any time of the..., from submitting a new application if they have participated in the program at any time during the... and have the capability and the facilities to provide the meal service planned for the number of...
7 CFR 225.14 - Requirements for sponsor participation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... an unanticipated school closure during the period from October through April (or at any time of the..., from submitting a new application if they have participated in the program at any time during the... and have the capability and the facilities to provide the meal service planned for the number of...
42 CFR 488.303 - State plan requirement.
Code of Federal Regulations, 2012 CFR
2012-10-01
... recognition, incentive payments, or both, nursing facilities that provide the highest quality care to Medicaid...) Transfer of residents. (5) Closure of the facility and transfer of residents. (6) State monitoring. (e... remedies that are in addition to those specified in paragraph (d) or (e) of this section, or alternative to...
Turbulence, Perturbance, and Educational Change
ERIC Educational Resources Information Center
Beabout, Brian R.
2012-01-01
While scholarship on educational change has long accepted that disruptions to the status quo are an essential part of the change process, disruption has never been more central to planned change than it is in the current political context in the USA, where legislation has mandated school closure, reconstitution, and turnaround as required remedies…
How to Perform Transcaval Access and Closure for Transcatheter Aortic Valve Implantation
Lederman, Robert J.; Babaliaros, Vasilis C.; Greenbaum, Adam B.
2016-01-01
Transcaval, or caval-aortic, access is a promising approach for fully percutaneous trans-catheter aortic valve implantation in patients without good conventional access options. This tutorial review provides step-by-step guidance to planning and executing the procedure, along with approaches to remedy complications. PMID:26356244
America’s Army: The Strength of the Nation, Strategic Plan, 2009-2015
2008-11-02
Realignment and Closure (BRAC) law of 2005 and several complex endeavors like the Grow-the-Army (GTA) and Global Defense Posture Realignment ( GDPR ...2.2.1 Oversee execution of MILCON to support Army stationing (AMF, BRAC, GDPR , and Army Growth) initiatives and timelines
50 CFR 600.815 - Contents of Fishery Management Plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...
50 CFR 600.815 - Contents of Fishery Management Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...
50 CFR 600.815 - Contents of Fishery Management Plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...
50 CFR 600.815 - Contents of Fishery Management Plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...
50 CFR 600.815 - Contents of Fishery Management Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...
ERIC Educational Resources Information Center
Stuart, Reginald
2009-01-01
Today, a national economy gone bust has derailed Black Americans' plans across the country. Gone are many of the economic gains, small as they were, achieved in the post-segregation era by millions of 1960s generation children and their children. Black America today is beset by job losses, business closures, pay cuts, furloughs, investment and…
Monitoring InBaskets With Feedback to Providers Enhances the Timeliness of Patient Care.
Trant, Amelia A; Strait, Michael; Kaplan, Rory; Dest, Vanna; Roshka, Adam; Lyons, Catherine A; Vest, Kevin A; Steffen, Tessa; Chiang, Anne; Adelson, Kerin B
2018-05-01
Electronic health records have changed providers' workflow. Epic's InBasket supplants traditional communication and is a central hub for clinical information. Failure to promptly complete records impairs communication and revenue collection. By tracking providers' InBasket activities and offering feedback, we hoped to improve InBasket management and interdisciplinary communication. We created a report to track 273 providers' InBasket activities, including ambulatory transcriptions, chart cosignatures, order cosignatures, patient calls, results, and billable encounters. The report showed how often and for how long each activity was delinquent. We completed three Plan-Do-Study-Act cycles. During cycle 1 (November to December 2015), we sent all providers automated e-mails with their monthly results. During cycle 2 (January to April 2016), we focused solely on billable encounter closure and sent targeted e-mails to providers with > 50 delinquent encounters. The e-mails stated that providers had 30 days to complete encounters or their practices would be closed to new patients; at 30 days, noncompliant providers had 60 days before practice suspension. During cycle 3 (May to September 2016), we continued to monitor and send targeted e-mails to providers who accumulated > 50 encounters. We modeled the financial impact of the intervention using net closure data, the report's aging function, and billing logs. InBasket monitoring with structured feedback decreased open encounters by 53.43%. We did not see improvements in the other metrics that the report tracked. We estimate that $231,724 was saved as a result of the intervention and $349,179 was lost to filing deadlines. Automated e-mails did not reduce open encounters; targeted e-mails to providers improved InBasket management.
Boyd, Matt; Baker, Michael G.; Mansoor, Osman D.; Kvizhinadze, Giorgi; Wilson, Nick
2017-01-01
Background Countries are well advised to prepare for future pandemic risks (e.g., pandemic influenza, novel emerging agents or synthetic bioweapons). These preparations do not typically include planning for complete border closure. Even though border closure may not be instituted in time, and can fail, there might still plausible chances of success for well organized island nations. Objective To estimate costs and benefits of complete border closure in response to new pandemic threats, at an initial proof-of-concept level. New Zealand was used as a case-study for an island country. Methods An Excel spreadsheet model was developed to estimate costs and benefits. Case-study specific epidemiological data was sourced from past influenza pandemics. Country-specific healthcare cost data, valuation of life, and lost tourism revenue were imputed (with lost trade also in scenario analyses). Results For a new pandemic equivalent to the 1918 influenza pandemic (albeit with half the mortality rate, “Scenario A”), it was estimated that successful border closure for 26 weeks provided a net societal benefit (e.g., of NZ$11.0 billion, USD$7.3 billion). Even in the face of a complete end to trade, a net benefit was estimated for scenarios where the mortality rate was high (e.g., at 10 times the mortality impact of “Scenario A”, or 2.75% of the country’s population dying) giving a net benefit of NZ$54 billion (USD$36 billion). But for some other pandemic scenarios where trade ceased, border closure resulted in a net negative societal value (e.g., for “Scenario A” times three for 26 weeks of border closure–but not for only 12 weeks of closure when it would still be beneficial). Conclusions This “proof-of-concept” work indicates that more detailed cost-benefit analysis of border closure in very severe pandemic situations for some island nations is probably warranted, as this course of action might sometimes be worthwhile from a societal perspective. PMID:28622344
Closure Report for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2012-08-15
This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 562, Waste Systems, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 562 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 562 consists of the following 13 Corrective Action Sites (CASs), located in Areas 2, 23, and 25 of the Nevadamore » National Security Site: · CAS 02-26-11, Lead Shot · CAS 02-44-02, Paint Spills and French Drain · CAS 02-59-01, Septic System · CAS 02-60-01, Concrete Drain · CAS 02-60-02, French Drain · CAS 02-60-03, Steam Cleaning Drain · CAS 02-60-04, French Drain · CAS 02-60-05, French Drain · CAS 02-60-06, French Drain · CAS 02-60-07, French Drain · CAS 23-60-01, Mud Trap Drain and Outfall · CAS 23-99-06, Grease Trap · CAS 25-60-04, Building 3123 Outfalls Closure activities began in October 2011 and were completed in April 2012. Activities were conducted according to the Corrective Action Plan for CAU 562 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste and hazardous waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 562 · The transfer of CAU 562 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less
Pornsiriwong, Wannarat; Estavillo, Gonzalo M; Chan, Kai Xun; Tee, Estee E; Ganguly, Diep; Crisp, Peter A; Phua, Su Yin; Zhao, Chenchen; Qiu, Jiaen; Park, Jiyoung; Yong, Miing Tiem; Nisar, Nazia; Yadav, Arun Kumar; Schwessinger, Benjamin; Rathjen, John; Cazzonelli, Christopher I; Wilson, Philippa B; Gilliham, Matthew; Chen, Zhong-Hua; Pogson, Barry J
2017-03-21
Organelle-nuclear retrograde signaling regulates gene expression, but its roles in specialized cells and integration with hormonal signaling remain enigmatic. Here we show that the SAL1-PAP (3'-phosphoadenosine 5'- phosphate) retrograde pathway interacts with abscisic acid (ABA) signaling to regulate stomatal closure and seed germination in Arabidopsis . Genetically or exogenously manipulating PAP bypasses the canonical signaling components ABA Insensitive 1 (ABI1) and Open Stomata 1 (OST1); priming an alternative pathway that restores ABA-responsive gene expression, ROS bursts, ion channel function, stomatal closure and drought tolerance in ost1 -2. PAP also inhibits wild type and abi1 -1 seed germination by enhancing ABA sensitivity. PAP-XRN signaling interacts with ABA, ROS and Ca 2+ ; up-regulating multiple ABA signaling components, including lowly-expressed Calcium Dependent Protein Kinases (CDPKs) capable of activating the anion channel SLAC1. Thus, PAP exhibits many secondary messenger attributes and exemplifies how retrograde signals can have broader roles in hormone signaling, allowing chloroplasts to fine-tune physiological responses.
488-1D Ash Basin closure cap help modeling- Microdrain® liner option
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dyer, J. A.
At the request of Area Completion Engineering and in support of the 488-1D Ash Basin closure, the Savannah River National Laboratory (SRNL) performed hydrologic simulations of the revised 488-1D Ash Basin closure cap design using the Hydrologic Evaluation of Landfill Performance (HELP) model. The revised design substitutes a MicroDrain Liner®—60-mil low-density polyethylene geomembrane structurally integrated with 130-mil drainage layer—for the previously planned drainage/barrier system—300-mil geosynthetic drainage layer (GDL), 300-mil geosynthetic clay liner (GCL), and 6-inch common fill soil layer. For a 25-year, 24-hour storm event, HELP model v3.07 was employed to (1) predict the peak maximum daily hydraulic head formore » the geomembrane layer, and (2) ensure that South Carolina Department of Health and Environmental Control (SCDHEC) requirements for the barrier layer (i.e., ≤ 12 inches hydraulic head on top of a barrier having a saturated hydraulic conductivity ≤ 1.0E-05 cm/s) will not be exceeded. A 25-year, 24-hour storm event at the Savannah River Site (SRS) is 6.1 inches rainfall (Weber 1998). HELP model v3.07 results based upon the new planned cap design suggest that the peak maximum daily hydraulic head on the geomembrane barrier layer will be 0.15 inches for a minimum slope equal to 3%, which is two orders of magnitude below the SCDHEC upper limit of 12 inches.« less
488-1D Ash basin closure cap help modeling-Microdrain® liner option
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dyer, J.
At the request of Area Completion Engineering and in support of the 488-1D Ash Basin closure, the Savannah River National Laboratory (SRNL) performed hydrologic simulations of the revised 488-1D Ash Basin closure cap design using the Hydrologic Evaluation of Landfill Performance (HELP) model. The revised design substitutes a MicroDrain Liner®—50-mil linear low-density polyethylene geomembrane structurally integrated with 130-mil drainage layer—for the previously planned drainage/barrier system—300-mil geosynthetic drainage layer (GDL), 300-mil geosynthetic clay liner (GCL), and 6-inch common fill soil layer. For a 25-year, 24-hour storm event, HELP model v3.07 was employed to (1) predict the peak maximum daily hydraulic headmore » for the geomembrane layer, and (2) ensure that South Carolina Department of Health and Environmental Control (SCDHEC) requirements for the barrier layer (i.e., ≤ 12 inches hydraulic head on top of a barrier having a saturated hydraulic conductivity ≤ 1.0E-05 cm/s) will not be exceeded. A 25-year, 24-hour storm event at the Savannah River Site (SRS) is 6.1 inches rainfall (Weber 1998). HELP model v3.07 results based upon the new planned cap design suggest that the peak maximum daily hydraulic head on the geomembrane barrier layer will be 0.179 inches for a minimum slope equal to 3%, which is approximately two orders of magnitude below the SCDHEC upper limit of 12 inches.« less
76 FR 58020 - Prescription Drug User Fee Act IV Information Technology Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-19
...] Prescription Drug User Fee Act IV Information Technology Plan AGENCY: Food and Drug Administration, HHS. ACTION... information technology (IT) plan entitled ``PDUFA IV Information Technology Plan'' (updated plan) to achieve... Information Technology Plan.'' This plan will meet one of the performance goals agreed to under the 2007...
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern weremore » either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.« less
Device closure of secundum atrial septal defect's and the risk of cardiac erosion.
Thomson, J D R; Qureshi, S A
2015-12-01
Cardiac erosion related to transcatheter atrial septal defect closure devices is of increasing concern. Erosion is reported to have occurred with most of currently available occluder devices. Perhaps due to the very large number of implants worldwide, the Amplatzer (St Jude) occluder is associated with the majority of cardiac erosion events reported in the literature. Best current estimates of the incidence of erosion with the St Jude device are between one and three cases per 1000 implants. Most events occur early after implantation and it is rare, although not unheard of, for events to occur after a year following device insertion. It is important that those involved with closure programmes are vigilant for the problem, because device-related erosion is associated with a significant mortality risk. Despite considerable debate, the risk factors (either patient or device) for erosion remain unclear and require further investigation. Currently available data sets have focussed largely on erosion cohorts and are unable to place these cases in appropriate context with non-erosion closure cases. What is certain is that programmes implanting these devices must take care to implant appropriately sized devices and have in place plans to ensure that patients are both well informed and can access help and advice in the event of developing symptoms.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2010-09-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 408: Bomblet Target Area (TTR), Tonopah Test Range, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 408 is located at the Tonopah Test Range, Nevada, and consists of Corrective Action Site (CAS) TA-55-002-TAB2, Bomblet Target Areas. This CAS includes the following seven target areas: • Mid Target • Flightline Bomblet Location •more » Strategic Air Command (SAC) Target Location 1 • SAC Target Location 2 • South Antelope Lake • Tomahawk Location 1 • Tomahawk Location 2 The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for the CAS within CAU 408 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 408 issued by the Nevada Division of Environmental Protection. From July 2009 through August 2010, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 408: Bomblet Target Area, Tonopah Test Range (TTR), Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Identify and remove munitions of explosive concern (MEC) associated with DOE activities. • Investigate potential disposal pit locations. • Remove depleted uranium-contaminated fragments and soil. • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 408. Assessment of the data indicated COCs are not present at CAS TA-55-002-TAB2; therefore, no corrective action is necessary. No use restrictions are required to be placed on this CAU because the investigation showed no evidence of remaining soil contamination or remaining debris/waste upon completion of all investigation activities. The MEC was successfully removed and dispositioned as planned using current best available technologies. As MEC guidance and general MEC standards acknowledge that MEC response actions cannot determine with 100 percent certainty that all MEC and unexploded ordnance (UXO) are removed, the clean closure of CAU 408 will implement a best management practice of posting UXO hazard warning signs near the seven target areas. The signs will warn future land users of the potential for encountering residual UXO hazards. The DOE, National Nuclear Security Administration Nevada Site Office, provides the following recommendations: • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office, is requested from the Nevada Division of Environmental Protection for closure of CAU 408. • Corrective Action Unit 408 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
Financial viability, medical technology, and hospital closures.
Prince, T R; Sullivan, J A
2000-01-01
Informed investments in medical technology and information systems are associated with the financial viability of community hospitals. Financially distressed facilities are 3 to 4 years behind proactive hospitals in supporting high-speed data, voice, and image transmissions to physicians in various locations. Impact of the Balanced Budget Act of 1997, fraud and abuse activities, Y2K issues, and lack of information systems support for physicians will result in 800 hospital closures and mergers of distressed hospitals over the next 60 months. These findings are based on the application of an eight-step framework for classifying information systems in health care entities. This framework is validated by survey instruments, site visits, interviews with senior management in 44 health care entities containing 576 hospitals, and judgments on the financial status of the health care entities.
Developing a Strategic Plan for Transitioning to Healthcare Knowledge Services Centers (HKSCs)
Goldstein, H. Mark; Coletti, Margaret H.
2012-01-01
Facing a negative trend in the form of downsizing, layoffs, and closures, a small committee of hospital librarians in New England was formed in 2004 to provide library advocacy. Between 2008 and 2010, 23 hospital libraries closed in New England. In 2010, the committee shifted its focus from advocacy to a platform for change. This resulted in the creation of the Healthcare Knowledge Services Center (HKSC) Template. The Template is the basis for a 3-phased, 5-year strategic plan to establish several regional pilots, transitioning traditional hospital libraries to healthcare knowledge services centers. This article focuses on Phase One of the strategic plan, Development. PMID:23125551
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Michael G.
This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.
76 FR 24514 - Notice of Temporary Closures on Public Lands in Washoe County, NV
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-02
...As authorized under the provisions of the Federal Land Policy and Management Act of 1976, notice is hereby given that certain public lands near Stead, Nevada, will be temporarily closed to all public use to provide for public safety during the 2011 Reno Air Racing Association Pylon Racing Seminar and the Reno National Championship Air Races.
75 FR 38548 - Notice of Temporary Closures of Public Lands in Washoe County, NV
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-02
...As authorized under the provisions of the Federal Land Policy and Management Act of 1976, notice is hereby given that certain public lands near Stead, Nevada, will be temporarily closed to all public use to provide for public safety during the 2010 Reno Air Racing Association Pylon Racing Seminar and the Reno National Championship Air Races.
Rep. Noem, Kristi L. [R-SD-At Large
2012-03-29
House - 05/10/2012 Referred to the Subcommittee on Department Operations, Oversight, and Credit. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
Code of Federal Regulations, 2010 CFR
2010-04-01
... single site of employment; (c) Closures and realignments of military installations; (d) Multiple layoffs... individuals in a community; (e) Emergencies or natural disasters, as defined in paragraphs (1) and (2) respectively, of section 102 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C...
MATERIALS SUPPORTING THE NEW RECREATIONAL ...
EPA is developing new, rapid methods for monitoring water quality at beaches to determine adequacy of water quality for swimming. The methods being developed rely upon quantitive polymerase chain reaction technology. They will permit real time decisions regarding beach closures. The methods are supported by a series of epidemiology studies evaluating the rate of GI illness resulting from swimming events. Implementation of BEACH Act amendments
Bubblers Speed Nuclear Waste Processing at SRS
None
2018-05-23
At the Department of Energy's Savannah River Site, American Recovery and Reinvestment Act funding has supported installation of bubbler technology and related enhancements in the Defense Waste Processing Facility (DWPF). The improvements will accelerate the processing of radioactive waste into a safe, stable form for storage and permit expedited closure of underground waste tanks holding 37 million gallons of liquid nuclear waste.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This report covers the reporting period calendar year 2016 and the fourth quarter of 2015 (October 2015 through December 2016). This change to the reporting periods (i.e., fiscal to calendar) is to gain efficiencies during report development and to better align with other environmental report schedules.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-04
... Public Hearings AGENCY: Department of the Navy, DoD. ACTION: Notice. SUMMARY: Pursuant to Section 102(2... per Public Law 101-510, the Defense Base Closure and Realignment Act of 1990, as amended in 2005. Public hearings will be held to provide information and receive oral and written comments on the Draft...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
..., closures and coils, from graphic arts operations, from the provision of sampling and testing facilities... Provision of Sampling and Revised 03/21/01....... 05/31/01 Testing Facilities. AVAQMD 1168 Adhesive and... District (1) Rule 205, ``Provision of Sampling and Testing Facilities,'' revised on March 21, 2001...
DOT National Transportation Integrated Search
1998-01-01
The purpose of the ITS Planning Handbook is to provide a tool to assist in meeting current challenges. Specifically, the purposes of the Handbook are to: (1) Identify and describe ways that ITS should be integrated with the mainstream transportation ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-05
... economic blow that would result from an earlier closure and is an appropriate balance of environmental and... BART rules for the Boardman facility achieve the proper balance of environmental benefits, the cost to... secure greater environmental benefits with a better balance of cost and risk by transitioning the...
40 CFR 267.115 - After I stop operating, how long until I must close?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES...? (a) Within 90 days after the final volume of hazardous waste is sent to a unit, you must treat or remove from the unit all hazardous wastes following the approved closure plan. (b) You must complete...
40 CFR 267.115 - After I stop operating, how long until I must close?
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES...? (a) Within 90 days after the final volume of hazardous waste is sent to a unit, you must treat or remove from the unit all hazardous wastes following the approved closure plan. (b) You must complete...
40 CFR 267.115 - After I stop operating, how long until I must close?
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES...? (a) Within 90 days after the final volume of hazardous waste is sent to a unit, you must treat or remove from the unit all hazardous wastes following the approved closure plan. (b) You must complete...
40 CFR 61.226 - Reconsideration of rescission and reinstatement of this subpart.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Emission Standards for Radon Emissions From the Disposal of Uranium Mill Tailings § 61.226 Reconsideration... by EPA and NRC or the tailings closure plan (radon) (i.e., contained in the license) requirements establishing milestones for the purpose of emplacing a permanent radon barrier that will achieve compliance...
Living on a Cotton Farm: Mexican American Life in Texas.
ERIC Educational Resources Information Center
Black, Mary S.
This packet of six lesson plans highlights Mexican-American life on a Texas cotton farm in the early 20th century. Each lesson provides a lesson overview; states educational objectives; cites materials needed; details the procedure for classroom implementation; offers a closure activity; and suggests an extension activity. The packet is divided…
40 CFR 61.226 - Reconsideration of rescission and reinstatement of this subpart.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Emission Standards for Radon Emissions From the Disposal of Uranium Mill Tailings § 61.226 Reconsideration... by EPA and NRC or the tailings closure plan (radon) (i.e., contained in the license) requirements establishing milestones for the purpose of emplacing a permanent radon barrier that will achieve compliance...
36 CFR 907.11 - Actions that normally require an environmental assessment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Actions that normally require an environmental assessment. 907.11 Section 907.11 Parks, Forests, and Public Property PENNSYLVANIA...) Street closures and other rearrangements of public space which were not covered in the Plan or the Final...
36 CFR 907.11 - Actions that normally require an environmental assessment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Actions that normally require an environmental assessment. 907.11 Section 907.11 Parks, Forests, and Public Property PENNSYLVANIA...) Street closures and other rearrangements of public space which were not covered in the Plan or the Final...
Building a New High School and Forging a New Community.
ERIC Educational Resources Information Center
Krajewski, Robert
1988-01-01
Two aging structures were replaced by Central High School in an Indiana steel town. Planning, board and administrator support, and community involvement eased negative attitudes toward the high school closures and resulted in a $36 million school that has unified the city and will serve it for over 50 years. (MLF)
Flood-inundation maps for Grand River, Red Cedar River, and Sycamore Creek near Lansing, Michigan
Whitehead, Matthew; Ostheimer, Chad J.
2015-08-26
These maps, used in conjunction with real-time USGS streamgage data and NWS forecasting, provide critical information to emergency management personnel and the public. This information is used to plan flood response actions, such as evacuations and road closures, as well as aid in postflood recovery efforts.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.302 Act. Act means the Potato Research and...
Code of Federal Regulations, 2012 CFR
2012-01-01
... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.302 Act. Act means the Potato Research and...
Code of Federal Regulations, 2011 CFR
2011-01-01
... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.302 Act. Act means the Potato Research and...
Code of Federal Regulations, 2013 CFR
2013-01-01
... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.302 Act. Act means the Potato Research and...
Code of Federal Regulations, 2014 CFR
2014-01-01
... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.302 Act. Act means the Potato Research and...
20 CFR 652.211 - What are State planning requirements under the Act?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What are State planning requirements under the Act? 652.211 Section 652.211 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... a One-Stop Delivery System Environment § 652.211 What are State planning requirements under the Act...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-26
...: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce... Liability Act of 1980 (CERCLA), the Oil Pollution Act (OPA) of 1990, the Clean Water Act (CWA), the National Oil and Hazardous Substances Pollution Contingency Plan (National Contingency Plan [NCP]), and other...
Turan, Cem; Büyükbayrak, Esra Esim; Yilmaz, Aylin Onan; Karsidag, Yasemin Karageyim; Pirimoglu, Meltem
2015-04-01
To compare the classical double-layer uterine closure to a double-layer purse-string uterine closure (Turan technique) in cesarean section regarding short- and long-term results. Patients were randomized into either the double-layer purse-string uterine closure arm (study group, 84 patients) or the classical double-layer uterine closure arm (control group, 84 patients). For short-term comparison, a detailed transvaginal ultrasound examination was planned in all patients 6 weeks after the operation and a wedge-shaped defect in the uterine incision scar was accepted as uterine scar defect and recorded. For the long-term comparison, subsequent pregnancies of these patients were followed up for any complication. The number of patients with ultrasonographically visible uterine scar defect was 12 (23.5% of all scar defects) in the study group whereas it was 39 (76.5% of all scar defects) in the control group (P < 0.001, χ(2) = 15.42). Demographic data, operation time, hospitalization time, preoperative and postoperative hemoglobin values were not significantly different between the groups. During the 2-year of the follow-up period, five patients in the study group and six patients in the control group became pregnant again. No complication during their pregnancies and second cesarean operation were encountered. With the Turan technique, the uterine incision length becomes shorter, and the frequency of uterine scar defect is lower regarding short-term results. More data is needed for long-term results. ClinicalTrials.gov NCT01287611. © 2014 The Authors. Journal of Obstetrics and Gynaecology Research © 2014 Japan Society of Obstetrics and Gynecology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boehlecke, R. F.
This letter report documents interim activities that have been completed at CAU 114 to support ongoing access and generate information necessary to plan future closure activities. General housekeeping and cleanup of debris was conducted in the EMAD yard, cold bays, support areas of Building 3900, and postmortem cell tunnel area of the hot bay. All non-asbestos ceiling tiles and loose and broken non-friable asbestos floor tiles were removed from support galleries and office areas. Non-radiologically contaminated piping and equipment in the cold areas of the building and in the two 120-ton locomotives in the yard were tapped, characterized, drained, andmore » verified free of contents.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, Alissa J.
2015-01-01
This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly atmore » CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.« less
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 10 2010-01-01 2010-01-01 false Act. 1210.302 Section 1210.302 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... PLAN Watermelon Research and Promotion Plan Definitions § 1210.302 Act. Act means the Watermelon...
78 FR 78366 - Draft Generic Drug User Fee Act Information Technology Plan; Availability for Comment
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-26
...] Draft Generic Drug User Fee Act Information Technology Plan; Availability for Comment AGENCY: Food and... the availability for public comment of the draft information technology (IT) plan entitled ``GDUFA Information Technology Plan.'' This plan is intended to provide FDA's approach for enhancing business...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-26
...] Draft Prescription Drug User Fee Act V Information Technology Plan; Availability for Comment AGENCY... announcing the availability for public comment of the draft information technology (IT) plan entitled ``PDUFA V Information Technology Plan.'' This plan is intended to provide FDA's approach for enhancing...
20 CFR 323.3 - Standards for Board approval of a nongovernmental plan.
Code of Federal Regulations, 2012 CFR
2012-04-01
... RAILROAD UNEMPLOYMENT INSURANCE ACT NONGOVERNMENTAL PLANS FOR UNEMPLOYMENT OR SICKNESS INSURANCE § 323.3 Standards for Board approval of a nongovernmental plan. An unemployment or sickness benefit plan qualifies... conditions governing payment of benefits under the Railroad Unemployment Insurance Act. However, a plan will...
20 CFR 323.3 - Standards for Board approval of a nongovernmental plan.
Code of Federal Regulations, 2011 CFR
2011-04-01
... RAILROAD UNEMPLOYMENT INSURANCE ACT NONGOVERNMENTAL PLANS FOR UNEMPLOYMENT OR SICKNESS INSURANCE § 323.3 Standards for Board approval of a nongovernmental plan. An unemployment or sickness benefit plan qualifies... conditions governing payment of benefits under the Railroad Unemployment Insurance Act. However, a plan will...
20 CFR 323.3 - Standards for Board approval of a nongovernmental plan.
Code of Federal Regulations, 2013 CFR
2013-04-01
... RAILROAD UNEMPLOYMENT INSURANCE ACT NONGOVERNMENTAL PLANS FOR UNEMPLOYMENT OR SICKNESS INSURANCE § 323.3 Standards for Board approval of a nongovernmental plan. An unemployment or sickness benefit plan qualifies... conditions governing payment of benefits under the Railroad Unemployment Insurance Act. However, a plan will...
20 CFR 323.3 - Standards for Board approval of a nongovernmental plan.
Code of Federal Regulations, 2014 CFR
2014-04-01
... RAILROAD UNEMPLOYMENT INSURANCE ACT NONGOVERNMENTAL PLANS FOR UNEMPLOYMENT OR SICKNESS INSURANCE § 323.3 Standards for Board approval of a nongovernmental plan. An unemployment or sickness benefit plan qualifies... conditions governing payment of benefits under the Railroad Unemployment Insurance Act. However, a plan will...
ReACT!: An Interactive Educational Tool for AI Planning for Robotics
ERIC Educational Resources Information Center
Dogmus, Zeynep; Erdem, Esra; Patogulu, Volkan
2015-01-01
This paper presents ReAct!, an interactive educational tool for artificial intelligence (AI) planning for robotics. ReAct! enables students to describe robots' actions and change in dynamic domains without first having to know about the syntactic and semantic details of the underlying formalism, and to solve planning problems using…
Stumpage price projections for selected Western species.
Richard W. Haynes; Kent P. Connaughton; Darius M. Adams
1980-01-01
The 1980 Resources Planning Act Timber Assessment and Program prepared in response to provisions of the Forest and Rangeland Renewable Resources Planning Act of 1974 (as amended by the National Forest Management Act of 1976) contains regional projections of average stumpage prices that are potentially useful in national forest planning. Their usefulness can be improved...
Closure of the R Reactor Disassembly Basin at the SRS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Austin, W.E.
The Facilities Disposition Division (FDD) at the Savannah River Site is engaged in planning the deactivation/closure of three of the site's five reactor disassembly basins. Activities are currently underway at R-Reactor Disassembly Basin and will continue with the P and C disassembly basins. The basins still contain the cooling and shielding water that was present when operations ceased. Low concentrations of radionuclides are present, with tritium, Cs-137, and Sr-90 being the major contributors. Although there is no evidence that any of the basins have leaked, the 50-year-old facilities will eventually contaminate the surrounding groundwaters. The FDD is pursuing a pro-activemore » solution to close the basins in-place and prevent a release to the groundwater. In-situ ion exchange is currently underway at the R-Reactor Disassembly Basin to reduce the Cs and Sr concentrations to levels that would allow release of the treated water to previously used on-site cooling ponds or to prevent ground water impact. The closure will be accomplished under CERCLA.« less
488-4D ASH LANDFILL CLOSURE CAP HELP MODELING
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phifer, M.
At the request of Area Completion Projects (ACP) in support of the 488-4D Landfill closure, the Savannah River National Laboratory (SRNL) has performed Hydrologic Evaluation of Landfill Performance (HELP) modeling of the planned 488-4D Ash Landfill closure cap to ensure that the South Carolina Department of Health and Environmental Control (SCDHEC) limit of no more than 12 inches of head on top of the barrier layer (saturated hydraulic conductivity of no more than 1.0E-05 cm/s) in association with a 25-year, 24-hour storm event is not projected to be exceeded. Based upon Weber 1998 a 25-year, 24-hour storm event at themore » Savannah River Site (SRS) is 6.1 inches. The results of the HELP modeling indicate that the greatest peak daily head on top of the barrier layer (i.e. geosynthetic clay liner (GCL) or high density polyethylene (HDPE) geomembrane) for any of the runs made was 0.079 inches associated with a peak daily precipitation of 6.16 inches. This is well below the SCDHEC limit of 12 inches.« less
Criticality assessment of LLRWDF closure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sarrack, A.G.; Weber, J.H.; Woody, N.D.
1992-10-06
During the operation of the Low Level Radioactive Waste Disposal Facility (LLRWDF), large amounts (greater than 100 kg) of enriched uranium (EU) were buried. This EU came primarily from the closing and decontamination of the Naval Fuels Facility in the time period from 1987--1989. Waste Management Operations (WMO) procedures were used to keep the EU boxes separated to prevent possible criticality during normal operation. Closure of the LLRWDF is currently being planned, and waste stabilization by Dynamic Compaction (DC) is proposed. Dynamic compaction will crush the containers in the LLRWDF and result in changes in their geometry. Research of themore » LLRWDF operations and record keeping practices have shown that the EU contents of trenches are known, but details of the arrangement of the contents cannot be proven. Reviews of the trench contents, combined with analysis of potential critical configurations, revealed that some portions of the LLRWDF can be expected to be free of criticality concerns while other sections have credible probabilities for the assembly of a critical mass, even in the uncompacted configuration. This will have an impact on the closure options and which trenches can be compacted.« less
Family planning funding cuts and teen childbearing.
Packham, Analisa
2017-09-01
Publicly funded family planning clinics provide low-cost and free contraception to nearly 1.5 million teens each year. In recent years, several states have considered legislation to defund family planning services, although little is known about how these cuts affect teen pregnancy. This paper fills this knowledge gap by exploiting a policy change in Texas that reduced funding for family planning services by 67% and resulted in over 80 clinic closures. I estimate the effects of the funding cuts on teen health outcomes using a difference-in-differences approach that compares the changes in teen birth rates in Texas counties that lost family planning funding to changes in counties outside of Texas with publicly funded clinics. I find that reducing funding for family planning services in Texas increased teen birth rates by approximately 3.4% over four years with effects concentrated 2-3 years after the initial cuts. Copyright © 2017 Elsevier B.V. All rights reserved.
Process quality planning of quality function deployment for carrot syrup
NASA Astrophysics Data System (ADS)
Ekawati, Yurida; Noya, Sunday; Widjaja, Filemon
2017-06-01
Carrot products are rarely available in the market. Based on previous research that had been done using QFD to generate product design of carrots products, the research to produce the process quality planning had been carried out. The carrot product studied was carrot syrup. The research resulted in a process planning matrix for carrot syrup. The matrix gives information about critical process plan and the priority of the critical process plan. The critical process plan on the production process of carrot syrup consists of carrots sorting, carrots peeling, carrots washing, blanching process, carrots cutting, the making of pureed carrots, filtering carrot juice, the addition of sugar in carrot juice, the addition of food additives in carrot juice, syrup boiling, syrup filtering, syrup filling into the bottle, the bottle closure and cooling. The information will help the design of the production process of carrot syrup.
Applying the plan-do-study-act model to increase the use of kangaroo care.
Stikes, Reetta; Barbier, Denise
2013-01-01
To increase the rate of participation in kangaroo care within a level III neonatal intensive care unit. Preterm birth typically results in initial separation of mother and infant which may disrupt the bonding process. Nurses within the neonatal intensive care unit can introduce strategies that will assist parents in overcoming fears and developing relationships with their infants. Kangaroo care is a method of skin-to-skin holding that has been shown to enhance the mother-infant relationship while also improving infant outcomes. However, kangaroo care has been used inconsistently within neonatal intensive care unit settings. The Plan-Do-Study-Act Model was used as a framework for this project. Plan-Do-Study-Act Model uses four cyclical steps for continuous quality improvement. Based upon Plan-Do-Study-Act Model, education was planned, surveys were developed and strategies implemented to overcome barriers. Four months post-implementation, the use of kangaroo care increased by 31%. Staff surveys demonstrated a decrease in the perceived barriers to kangaroo care as well as an increase in kangaroo care. Application of Plan-Do-Study-Act Model was successful in meeting the goal of increasing the use of kangaroo care. The use of the Plan-Do-Study-Act Model framework encourages learning, reflection and validation throughout implementation. Plan-Do-Study-Act Model is a strategy that can promote the effective use of innovative practices in nursing. © 2013 Blackwell Publishing Ltd.
Sen. McCaskill, Claire [D-MO
2012-06-04
Senate - 06/04/2012 Read twice and referred to the Committee on Agriculture, Nutrition, and Forestry. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental
2008-02-01
This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardousmore » waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the CRSDB, CRSP, and KHQ that differ from those established under the expired PCP, including modified suites of laboratory analytes (RCRA groundwater target compounds) for each site and annual rather than semiannual sampling frequencies for the CRSDB and KHQ. The new PCP also specifies the RCRA post-closure groundwater monitoring requirements for the ECRWP, a closed TSD unit that was not addressed in the expired PCP.« less
2013-01-01
Background During the 2009 H1N1 influenza pandemic, Australian public health officials closed schools as a strategy to mitigate the spread of the infection. This article examines school communities’ understanding of, and participation in, school closures and the beliefs and values which underpinned school responses to the closures. Methods We interviewed four school principals, 25 staff, 14 parents and 13 students in five schools in one Australian city which were either fully or partially closed during the 2009 H1N1 pandemic. Results Drawing on Thompson et al’s ethical framework for pandemic planning, we show that considerable variation existed between and within schools in their attention to ethical processes and values. In all schools, health officials and school leaders were strongly committed to providing high quality care for members of the school community. There was variation in the extent to which information was shared openly and transparently, the degree to which school community members considered themselves participants in decision-making, and the responsiveness of decision-makers to the changing situation. Reservations were expressed about the need for closures and quarantine and there was a lack of understanding of the rationale for the closures. All schools displayed a strong duty of care toward those in need, although school communities had a broader view of care than that of the public health officials. Similarly, there was a clear understanding of and commitment to protect the public from harm and to demonstrate responsible stewardship. Conclusions We conclude that school closures during an influenza pandemic represent both a challenge for public health officials and a litmus test for the level of trust in public officials, government and the school as institution. In our study, trust was the foundation upon which effective responses to the school closure were built. Trust relations within the school were the basis on which different values and beliefs were used to develop and justify the practices and strategies in response to the pandemic. PMID:23587175
Zhang, Tianyou; Fu, Xiuju; Ma, Stefan; Xiao, Gaoxi; Wong, Limsoon; Kwoh, Chee Keong; Lees, Michael; Lee, Gary Kee Khoon; Hung, Terence
2012-01-01
Background It is believed that combined interventions may be more effective than individual interventions in mitigating epidemic. However there is a lack of quantitative studies on performance of the combination of individual interventions under different temporal settings. Methodology/Principal Findings To better understand the problem, we develop an individual-based simulation model running on top of contact networks based on real-life contact data in Singapore. We model and evaluate the spread of influenza epidemic with intervention strategies of workforce shift and its combination with school closure, and examine the impacts of temporal factors, namely the trigger threshold and the duration of an intervention. By comparing simulation results for intervention scenarios with different temporal factors, we find that combined interventions do not always outperform individual interventions and are more effective only when the duration is longer than 6 weeks or school closure is triggered at the 5% threshold; combined interventions may be more effective if school closure starts first when the duration is less than 4 weeks or workforce shift starts first when the duration is longer than 4 weeks. Conclusions/Significance We therefore conclude that identifying the appropriate timing configuration is crucial for achieving optimal or near optimal performance in mitigating the spread of influenza epidemic. The results of this study are useful to policy makers in deliberating and planning individual and combined interventions. PMID:22403634
Swine-Flu Plans Put E-Learning in the Spotlight
ERIC Educational Resources Information Center
Davis, Michelle R.; Ash, Katie
2009-01-01
Last school year, many educators were caught unprepared when schools closed in response to cases of swine flu. This time around, both the federal government and school districts are putting specific online-learning measures in place to get ready for possible closures or waves of teacher and student absences because of a flu outbreak. To prepare…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-04
...-BC58 Fisheries of the Caribbean, Gulf of Mexico, and South Atlantic; Shrimp Fishery Off the Southern... Fishery Management Plan for the Shrimp Fishery of the South Atlantic Region (FMP) for review, approval... Atlantic states may request a concurrent closure of the penaeid shrimp (brown, pink, and white shrimp...
1998-12-01
3-16 3.4.7 Category 7: Areas Not Evaluated or Require Additional Evaluation .................... 3-16...Alternatives Evaluation Process for DIS Disposal and Reuse, Fort Holabird, Maryland ........ 2-6 Figure 3-1. Environmental Restoration Early Action...Requirement AREE ............... Area Requiring Environmental Evaluation AST .................. Above-ground Storage Tank BCP .................. BRAC
DOE Office of Scientific and Technical Information (OSTI.GOV)
DiSalvo, Rick; Surovchak, Scott; Spreng, Carl
2013-07-01
Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plantmore » (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)« less
Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilborn, Bill R.; Boehlecke, Robert F.
The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirementsmore » relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR. Frenchman Flat is currently the only UGTA CAU in the CR stage. Sampling requirements for this CAU are described in Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada (NNSA/NFO, 2016).« less
Pornsiriwong, Wannarat; Estavillo, Gonzalo M; Chan, Kai Xun; Tee, Estee E; Ganguly, Diep; Crisp, Peter A; Phua, Su Yin; Zhao, Chenchen; Qiu, Jiaen; Park, Jiyoung; Yong, Miing Tiem; Nisar, Nazia; Yadav, Arun Kumar; Schwessinger, Benjamin; Rathjen, John; Cazzonelli, Christopher I; Wilson, Philippa B; Gilliham, Matthew; Chen, Zhong-Hua; Pogson, Barry J
2017-01-01
Organelle-nuclear retrograde signaling regulates gene expression, but its roles in specialized cells and integration with hormonal signaling remain enigmatic. Here we show that the SAL1-PAP (3′-phosphoadenosine 5′- phosphate) retrograde pathway interacts with abscisic acid (ABA) signaling to regulate stomatal closure and seed germination in Arabidopsis. Genetically or exogenously manipulating PAP bypasses the canonical signaling components ABA Insensitive 1 (ABI1) and Open Stomata 1 (OST1); priming an alternative pathway that restores ABA-responsive gene expression, ROS bursts, ion channel function, stomatal closure and drought tolerance in ost1-2. PAP also inhibits wild type and abi1-1 seed germination by enhancing ABA sensitivity. PAP-XRN signaling interacts with ABA, ROS and Ca2+; up-regulating multiple ABA signaling components, including lowly-expressed Calcium Dependent Protein Kinases (CDPKs) capable of activating the anion channel SLAC1. Thus, PAP exhibits many secondary messenger attributes and exemplifies how retrograde signals can have broader roles in hormone signaling, allowing chloroplasts to fine-tune physiological responses. DOI: http://dx.doi.org/10.7554/eLife.23361.001 PMID:28323614
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-19
... can be provided in the desired format; the reporting burden (time and financial resources) is... for Submission of the Strategic State Plan for title I of the Workforce Investment Act of 1998 (WIA...'' strategic plan for title I of the Workforce Investment Act of 1998 and the Wagner-Peyser Act (WIA Section...
76 FR 40817 - Implementation of Section 224 of the Act; A National Broadband Plan for Our Future
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-12
...-50] Implementation of Section 224 of the Act; A National Broadband Plan for Our Future AGENCY... information collection requirements. The Office of Management and Budget (OMB) gave approval for these..., Implementation of Section 224 of the Act; A National Broadband Plan for Our Future. DATES: The final rules...
Media reporting of tenofovir trials in Cambodia and Cameroon
Mills, Edward; Rachlis, Beth; Wu, Ping; Wong, Elaine; Wilson, Kumanan; Singh, Sonal
2005-01-01
Background Two planned trials of pre-exposure prophylaxis tenofovir in Cambodia and Cameroon to prevent HIV infection in high-risk populations were closed due to activist pressure on host country governments. The international news media contributed substantially as the primary source of knowledge transfer regarding the trials. We aimed to characterize the nature of reporting, specifically focusing on the issues identified by media reports regarding each trial. Methods With the aid of an information specialist, we searched 3 electronic media databases, 5 electronic medical databases and extensively searched the Internet. In addition we contacted stakeholder groups. We included media reports addressing the trial closures, the reasons for the trial closures, and who was interviewed. We extracted data using content analysis independently, in duplicate. Results We included 24 reports on the Cambodian trial closure and 13 reports on the Cameroon trial closure. One academic news account incorrectly reported that it was an HIV vaccine trial that closed early. The primary reasons cited for the Cambodian trial closure were: a lack of medical insurance for trial related injuries (71%); human rights considerations (71%); study protocol concerns (46%); general suspicions regarding trial location (37%) and inadequate prevention counseling (29%). The primary reasons cited for the Cameroon trial closure were: inadequate access to care for seroconverters (69%); participants not sufficiently informed of risks (69%); inadequate number of staff (46%); participants being exploited (46%) and an unethical study design (38%). Only 3/23 (13%) reports acknowledged interviewing research personnel regarding the Cambodian trial, while 4/13 (30.8%) reports interviewed researchers involved in the Cameroon trial. Conclusion Our review indicates that the issues addressed and validity of the media reports of these trials is highly variable. Given the potential impact of the media in formulation of health policy related to HIV, efforts are needed to effectively engage the media during periods of controversy in the HIV/AIDS epidemic. PMID:16120208
Escalante-Pérez, María; Krol, Elzbieta; Stange, Annette; Geiger, Dietmar; Al-Rasheid, Khaled A. S.; Hause, Bettina; Neher, Erwin; Hedrich, Rainer
2011-01-01
Venus flytrap's leaves can catch an insect in a fraction of a second. Since the time of Charles Darwin, scientists have struggled to understand the sensory biology and biomechanics of this plant, Dionaea muscipula. Here we show that insect-capture of Dionaea traps is modulated by the phytohormone abscisic acid (ABA) and jasmonates. Water-stressed Dionaea, as well as those exposed to the drought-stress hormone ABA, are less sensitive to mechanical stimulation. In contrast, application of 12-oxo-phytodienoic acid (OPDA), a precursor of the phytohormone jasmonic acid (JA), the methyl ester of JA (Me-JA), and coronatine (COR), the molecular mimic of the isoleucine conjugate of JA (JA-Ile), triggers secretion of digestive enzymes without any preceding mechanical stimulus. Such secretion is accompanied by slow trap closure. Under physiological conditions, insect-capture is associated with Ca2+ signaling and a rise in OPDA, Apparently, jasmonates bypass hapto-electric processes associated with trap closure. However, ABA does not affect OPDA-dependent gland activity. Therefore, signals for trap movement and secretion seem to involve separate pathways. Jasmonates are systemically active because application to a single trap induces secretion and slow closure not only in the given trap but also in all others. Furthermore, formerly touch-insensitive trap sectors are converted into mechanosensitive ones. These findings demonstrate that prey-catching Dionaea combines plant-specific signaling pathways, involving OPDA and ABA with a rapidly acting trigger, which uses ion channels, action potentials, and Ca2+ signals. PMID:21896747
Escalante-Pérez, María; Krol, Elzbieta; Stange, Annette; Geiger, Dietmar; Al-Rasheid, Khaled A S; Hause, Bettina; Neher, Erwin; Hedrich, Rainer
2011-09-13
Venus flytrap's leaves can catch an insect in a fraction of a second. Since the time of Charles Darwin, scientists have struggled to understand the sensory biology and biomechanics of this plant, Dionaea muscipula. Here we show that insect-capture of Dionaea traps is modulated by the phytohormone abscisic acid (ABA) and jasmonates. Water-stressed Dionaea, as well as those exposed to the drought-stress hormone ABA, are less sensitive to mechanical stimulation. In contrast, application of 12-oxo-phytodienoic acid (OPDA), a precursor of the phytohormone jasmonic acid (JA), the methyl ester of JA (Me-JA), and coronatine (COR), the molecular mimic of the isoleucine conjugate of JA (JA-Ile), triggers secretion of digestive enzymes without any preceding mechanical stimulus. Such secretion is accompanied by slow trap closure. Under physiological conditions, insect-capture is associated with Ca(2+) signaling and a rise in OPDA, Apparently, jasmonates bypass hapto-electric processes associated with trap closure. However, ABA does not affect OPDA-dependent gland activity. Therefore, signals for trap movement and secretion seem to involve separate pathways. Jasmonates are systemically active because application to a single trap induces secretion and slow closure not only in the given trap but also in all others. Furthermore, formerly touch-insensitive trap sectors are converted into mechanosensitive ones. These findings demonstrate that prey-catching Dionaea combines plant-specific signaling pathways, involving OPDA and ABA with a rapidly acting trigger, which uses ion channels, action potentials, and Ca(2+) signals.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-30
... DEPARTMENT OF JUSTICE Notice of Lodging of First Addendum to Consent Decree Under the Emergency Planning and Community Right-To-Know Act, the Clean Water Act, the Resource Conservation and Recovery Act, the Federal Insecticide, Fungicide, and Rodenticide Act, the Comprehensive Environmental Response, Compensation, and Liability Act, the Safe...
FDA plan for statutory compliance. Notice of availability.
1998-11-24
The Food and Drug Administration (FDA) is announcing the availability of a document entitled "FDA Plan for Statutory Compliance" (the plan). This document is the agency's response to section 406(b) of the Food and Drug Administration Modernization Act of 1997 (FDAMA), which requires the Secretary of the Department of Health and Human Services (the Secretary) to develop a plan bringing the agency into compliance with the requirements of the Federal Food, Drug, and Cosmetic Act (the act).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shott, G.
2013-03-18
The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term R&D efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.« less
LANL continuity of operations plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Senutovitch, Diane M
2010-12-22
The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratorymore » EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.« less
43 CFR 3802.1-5 - Plan approval.
Code of Federal Regulations, 2011 CFR
2011-10-01
... National Historic Preservation Act (NHPA) or section 7 of the Endangered Species Act is needed. Periods... or compliance with section 106 of NHPA or section 7 of the Endangered Species Act, operations under... NHPA or section 7 of the Endangered Species Act, the plan of operations shall not be approved until the...
43 CFR 3802.1-5 - Plan approval.
Code of Federal Regulations, 2013 CFR
2013-10-01
... National Historic Preservation Act (NHPA) or section 7 of the Endangered Species Act is needed. Periods... or compliance with section 106 of NHPA or section 7 of the Endangered Species Act, operations under... NHPA or section 7 of the Endangered Species Act, the plan of operations shall not be approved until the...
43 CFR 3802.1-5 - Plan approval.
Code of Federal Regulations, 2012 CFR
2012-10-01
... National Historic Preservation Act (NHPA) or section 7 of the Endangered Species Act is needed. Periods... or compliance with section 106 of NHPA or section 7 of the Endangered Species Act, operations under... NHPA or section 7 of the Endangered Species Act, the plan of operations shall not be approved until the...
43 CFR 3802.1-5 - Plan approval.
Code of Federal Regulations, 2014 CFR
2014-10-01
... National Historic Preservation Act (NHPA) or section 7 of the Endangered Species Act is needed. Periods... or compliance with section 106 of NHPA or section 7 of the Endangered Species Act, operations under... NHPA or section 7 of the Endangered Species Act, the plan of operations shall not be approved until the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-27
... Coastal Fisheries Cooperative Management Act Provisions; Atlantic Coastal Shark Fishery AGENCY: National... Atlantic Coastal Fisheries Cooperative Management Act (Act), NMFS, upon a delegation of authority from the... Plan for Atlantic Coastal Sharks (Plan) and that the measures New Jersey has failed to implement and...
Sustainable gold mining management waste policy in Romania
NASA Astrophysics Data System (ADS)
Tudor, Elena; Filipciuc, Constantina
2016-04-01
Sustainable mining practices and consistent implementation of the mining for the closure planning approach, within an improved legislative framework, create conditions for the development of creative, profitable, environmentally-sound and socially-responsible management and reuse of mine lands. According to the World Commission on Environment and Development definition, sustainable development is the type of development that meets the needs of the present without compromising the ability of future generations to meet their own needs. Romania has the largest gold reserves in Europe (760 million tons of gold-silver ores, of which 40 million tons in 68 gold deposits in the Apuseni Mountains. New mining projects draw particular attention regarding the environmental risks they cause. Rehabilitation is an ongoing consideration throughout the mine's lifecycle, both from a technical and a financial standpoint. The costs of land rehabilitation are classified as the mine's operating costs. According to Directive 2004/35/EC on environmental liability, the prevention and remedying of environmental damage should be implemented by applying the "polluter pays" principle, in line with the principle of sustainable development. Directive on the management of waste from extractive industries and amending Directive obliges operators to provide (and periodically adjust in size) a financial guarantee for waste facility maintenance and post-closure site restoration, including land rehabilitation. According to the Romanian Mining Law, the license holder has the following obligations related to land use and protection: to provide environmental agreements as one of the prerequisites for a building permit; to regularly update the mine closure plan; to set up and maintain the financial guarantee for environmental rehabilitation; and to execute and finalize the environmental rehabilitation of affected land in the mining site, according to the mine closure plan, including the post-closure monitoring program implementation and financing. Apart from the Mining Law, the Government Decision, which transposes EU Directive on the management of waste from extractive industries, as well as Government Emergency Ordinance, which implements the requirements of EU Directive 2004/35/CE on environmental liability, requests financial guarantees for waste facilities maintenance and for environment restoration in the case of pollution, respectively. In practice, there are problems in the calculation of the financial guarantee and the development of financial security instruments and markets as required by Directive, due to the lack of expertise in financial, economic and liability matters. Mining companies are usually not required to set up a special guarantee for the waste facilities, but only to set up and maintain the financial guarantee regulated under the Mining Law. Romania - because of the structure of its mining sector - has serious environmental legacies, a lack of funds for their restoration and the need to strengthen the administrative capacity in this area, as well as the important tasks on harmonization and/or implementation of the EU mining waste legislation. This work is presented within the framework of SUSMIN project. Key words : sustainable development, waste management, policy
National Highway Traffic Safety Administration FY 1995 Performance Plan
DOT National Transportation Integrated Search
1994-09-01
The NHTSA Fiscal Year 1995 performance plan for the Government Performance and Results Act of 1993 (GPRA) is the second in the three year pilot phase of the Act. This plan differs from the FY 1994 plan in two respects: 1) it uses a different "perform...
Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2017.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ziock, Robert; Little, Bonnie Colleen
The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised andmore » updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for Calendar Year (CY) 2017 as required by the Permit. The CAMU containment cell consists of engineered barriers including a cover system, a bottom liner with a leachate collection and removal system (LCRS), and a vadose zone monitoring system (VZMS). The VZMS provides information on soil conditions under the cell for early leak detection. The VZMS consists of three monitoring subsystems, which include the primary subliner (PSL), a vertical sensor array (VSA), and the Chemical Waste Landfill (CWL) sanitary sewer (CSS) line. The PSL, VSA, and CSS monitoring subsystems are monitored quarterly for soil moisture concentration, the VSA is monitored quarterly for soil temperature, and the VSA and CSS monitoring subsystems are monitored annually for volatile organic compound (VOC) concentrations in the soil vapor at various depths. Baseline data for the soil moisture, soil temperature, and soil vapor were established between October 2003 and September 2004.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alvarado, Juan; Matthews, Patrick
This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). This report covers calendar year 2017 and includes visual inspection and repair activities completed at the following CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 487: Thunderwell Site (TTR) Visual inspections were conducted according to the post-closure plans in the approved closure reportsmore » and subsequent correspondence with the Nevada Division of Environmental Protection. The annual post-closure inspections were conducted on May 23, 2017. No maintenance or repair issues were noted at CAU 400 and CAU 487. Maintenance items and subsequent repairs include the following: CAU 407: A large animal burrow was observed in the southeast corner of the cover during the inspection. Two additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018. CAU 424: CAS 03-08-002-A304 (Landfill Cell A3-4): A new monument was installed and the subsidence area was repaired on January 9, 2018. CAU 424: CAS 03-08-002-A308 (Landfill Cell A3-8): Lava rock, used to mark the two eastern monument locations, was noted as missing during the inspection. The lava rock was replaced on January 9, 2018. CAU 453: Five large animal burrows, located near the east–central portion of cover, was noted during the inspection. Eight additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018.« less
Specialty hospital market proliferation: Strategic implications for general hospitals.
Al-Amin, Mona; Zinn, Jacqueline; Rosko, Michael D; Aaronson, William
2010-01-01
Since the early 1990s, specialty hospitals have been continuously increasing in number. A moratorium was passed in 2003 that prohibited physicians' referrals of Medicare patients to newly established specialty hospitals if the physician has ownership stakes in the hospital. Although this moratorium expired in effect in 2007, many are still demanding that the government pass new policies to discourage the proliferation of specialty hospitals. This study aimed at examining the regulatory and environmental forces that influence specialty hospitals founding rate. Specifically, we use the resource partitioning theory to investigate the relationship between general hospitals closure rates and the market entry of specialty hospitals. This study will help managers of general hospitals in their strategic thinking and planning. We rely on secondary data resources, which include the American Hospital Association, Area Resource file, census, and Center for Medicare and Medicaid Services data, to perform a longitudinal analysis of the founding rate of specialty hospital in the 48 states. Specifically, we use the negative binomial generalized estimating equation approach available through Stata 9.0 to study the effect of general hospitals closure rate and environmental variables on the proliferation of specialty hospitals. Specialty hospitals founding rate seems to be significantly related to general hospitals closure rates. Moreover, results indicate that economic, supply, regulatory, and financial conditions determine the founding rate of specialty hospitals in different states. The results from this study indicate that the closure of general hospitals creates market conditions that encourage the market entry of specialized health care delivery forms such as specialty hospitals. Managers of surviving general hospitals have to view the closure of other general hospitals not just as an opportunity to increase market share but also as a threat of competition from new forms of health care organizations.
Blanc, Thomas; Guerin, Florent; Franchi-Abella, Stéphanie; Jacquemin, Emmanuel; Pariente, Danièle; Soubrane, Olivier; Branchereau, Sophie; Gauthier, Frédéric
2014-07-01
To propose an anatomical classification of congenital portosystemic shunts (CPSs) correlating with conservative surgery. CPSs entail a risk of life-threatening complications because of poor portal inflow, which may be prevented or cured by their closure. Current classifications based on portal origin of the shunt are not helpful for planning conservative surgery. Twenty-three patients who underwent at least 1 surgical procedure to close the CPSs were included in this retrospective study (1997-2012). We designed a classification according to the ending of the shunt in the caval system. We analyzed the results and outcomes of surgery according to this classification. Two patients had an extrahepatic portosystemic shunt, 17 had a portacaval shunt [subdivided in 5 end-to-side-like portal-caval, 7 side-to-side-like portal-caval, and 5 H-shaped (H-type portal-caval)], 2 had portal-to-hepatic vein shunts (portohepatic), and 2 had a persistent ductus venosus. All extrahepatic portosystemic shunts, H-type portal-caval, portohepatic, and patent ductus venosus patients had a successful 1-stage ligation. All 5 end-to-side-like portal-caval patients had a threadlike intrahepatic portal venous system; a 2-stage complete closure was successfully achieved for 4 and a partial closure for 1. The first 2 side-to-side-like portal-caval patients had a successful 2-stage closure whereas the 5 others had a 1-stage longitudinal caval partition. All patients are alive and none needed a liver transplantation. Our classification correlates the anatomy of CPSs and the surgical strategy: outcomes are good provided end-to-side-like portal-caval shunts patients have a 2-stage closure, side-to-side portal-caval shunts patients have a 1-stage caval partition, and the others have a 1-stage ligation.
Johnson, Carole D.; White, Eric A.; Joesten, Peter K.
2012-01-01
Time‐lapse geophysical surveys using frequency‐domain electromagnetics (FDEM) can indirectly measure time‐varying hydrologic parameters such as fluid saturation or solute concentration. Monitoring of these processes provides insight into aquifer properties and the effectiveness of constructed controls (such as leachate interceptor trenches), as well as aquifer responses to natural or induced stresses. At the University of Connecticut landfill, noninvasive, electromagnetic induction (EMI) methods were used to monitor changes in subsurface electrical conductivity that were related to the landfill‐closure activities. After the landfill was closed, EMI methods were used to monitor changes in water saturation and water quality. As part of a long‐term monitoring plan to observe changes associated with closure, redevelopment, and remediation of the former landfill, EMI data were collected to supplement information from groundwater samples collected in wells to the south and north of the landfill. In comparison to single‐point measurements that could have been collected by conventional installation of additional monitoring wells, the EMI methods provided increased spatial coverage, and were less invasive and therefore less destructive to the wetland north of the landfill. To monitor effects of closure activities on the subsurface conductivity, EMI measurements were collected from 2004 to 2011 along discrete transects north and south of the landfill prior to, during, and after the landfill closure. In general, the results indicated an overall decline in subsurface electrical conductivity with time and with distance from the former landfill. This decline in electrical conductivity indicated that the closure and remediation efforts reduced the amount of leachate that originated from the landfill and that entered the drainages to the north and south of the landfill.
DeFazio, Michael V; Economides, James M; Anghel, Ersilia L; Mathis, Ryan K; Barbour, John R; Attinger, Christopher E
2017-10-01
Loss of domain often complicates attempts at delayed wound closure in regions of high tension. Wound temporization with traction-assisted internal negative pressure wound therapy (NPWT), using bridging retention sutures, can minimize the effects of edema and elastic recoil that contribute to progressive tissue retraction over time. The investigators evaluated the safety and efficacy of this technique for complex wound closure. Between May 2015 and November 2015, 18 consecutive patients underwent staged reconstruction of complex and/or contaminated soft tissue defects utilizing either conventional NPWT or modified NPWT with instillation and continuous dermatotraction via bridging retention sutures. Instillation of antimicrobial solution was reserved for wounds containing infected/exposed hardware or prosthetic devices. Demographic data, wound characteristics, reconstructive outcomes, and complications were reviewed retrospectively. Eighteen wounds were treated with traction-assisted internal NPWT using the conventional (n = 11) or modified instillation (n = 7) technique. Defects involved the lower extremity (n = 14), trunk (n = 3), and proximal upper extremity (n = 1), with positive cultures identified in 12 wounds (67%). Therapy continued for 3 to 8 days (mean, 4.3 days), resulting in an average wound surface area reduction of 78% (149 cm² vs. 33 cm²) at definitive closure. Seventeen wounds (94%) were closed directly, whereas the remaining defect required coverage with a local muscle flap and skin graft. At final follow-up (mean, 12 months), 89% of wounds remained closed. In 2 patients with delayed, recurrent periprosthetic infection (mean, 7.5 weeks), serial debridement/hardware removal mandated free tissue transfer for composite defect reconstruction. Traction-assisted internal NPWT provides a safe and effective alternative to reduce wound burden and facilitate definitive closure in cases where delayed reconstruction of high-tension wounds is planned.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-05
... DEPARTMENT OF JUSTICE Notice of Lodging of Consent Decree Under the Clean Water Act, Emergency Planning and Community Right-to-Know Act, and Oil Pollution Act Notice is hereby given that on July 31... Enterprises, Inc. (``Defendants'') alleging violations of Sections 311(c) and (j) of the Clean Water Act...
Using Iterative Plan-Do-Study-Act Cycles to Improve Teaching Pedagogy.
Murray, Elizabeth J
2018-01-15
Most students entering nursing programs today are members of Generation Y or the Millennial generation, and they learn differently than previous generations. Nurse educators must consider implementing innovative teaching strategies that appeal to the newest generation of learners. The Plan-Do-Study-Act cycle is a framework that can be helpful when planning, assessing, and continually improving teaching pedagogy. This article describes the use of iterative Plan-Do-Study-Act cycles to implement a change in teaching pedagogy.
78 FR 67393 - Change in Discount Rate for Water Resources Planning
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
... Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate...
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. M. Obi
2000-04-01
The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed following the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999b) and consisted of closure-in-place with partial excavation, disposal, backfilling, administrative controls, and post-closure monitoring. Soil with petroleum hydrocarbon concentrations above the Nevada Division of Environmental Protection (NDEP) Action Level of 100 milligrams per kilogram (mg/kg) (Nevada Administrative Code, 1996) was removed to a depth of 1.5 meters (m) (5 feet [ft]). The excavations were backfilled with clean fillmore » to restore the site and to prevent contact with deeper, closed-in-place soil that exceeded the NDEP Action Level. According to the Corrective Action Investigation Plan (CAIP) (DOE, 1998), the Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting and emergency response personnel at the NTS and encompasses an area approximately 85 by 115 m (280 by 380 ft). The location of the Mercury Fire Training Pit is shown in Figure 1 and a site plan is shown in Figure 2. The Mercury Fire Training Pit formerly included a bermed bum pit with four small bum tanks; four large above ground storage tanks (ASTS); an overturned bus, a telephone pole storage area; and several areas for burning sheds, pallets, and cables. During the active life of the Mercury Fire Training Pit, training events were conducted at least monthly and sometimes as often as weekly. Fuels burned during these events included off-specification or rust-contaminated gasoline, diesel, and aviation fuel (JP-4). Other items burned during these events included paint, tires, a pond liner, wood, paper, cloth, and copper cable. Approximately 570 liters (L) (150 gallons [gal]) of fuel were used for each training event resulting in an approximate total of 136,000 L (36,000 gal) of fuel used over the life of the Mercury Fire Training Pit. Unburned fuel was allowed to pool on the ground and was left to eventually volatilize or soak into the soil. In addition, fuels from the ASTS and fuels and fluids from the overturned bus leaked or spilled onto the ground. Approximately 19 L to 38 L (5 to 10 gal) of paint were also burned monthly until sometime in the 1970s.« less
Studies of planning behavior of aircraft pilots in normal, abnormal, and emergency situations
NASA Technical Reports Server (NTRS)
Johannsen, G.; Rouse, W. B.; Hillmann, K.
1981-01-01
A methodology for the study of human planning behavior in complex dynamic systems is presented and applied to the study of aircraft pilot behavior in normal, abnormal and emergency situations. The method measures the depth of planning, that is the level of detail employed with respect to a specific task, according to responses to a verbal questionnaire, and compares planning depth with variables relating to time, task criticality and the probability of increased task difficulty. In two series of experiments, depth of planning was measured on a five- or ten-point scale during various phases of flight in a HFB-320 simulator under normal flight conditions, abnormal scenarios involving temporary runway closure due to snow removal or temporary CAT-III conditions due to a dense fog, and emergency scenarios involving engine shut-down or hydraulic pressure loss. Results reveal a dichotomy between event-driven and time-driven planning, different effects of automation in abnormal and emergency scenarios and a low correlation between depth of planning and workload or flight performance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ridge, A. Christianne; Barr, Cynthia S.; Pinkston, Karen E.
Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2011, the NRC staff reviewed DOE performance assessments for tank closure at the F-Tank Farm (FTF) Facility and salt waste disposal at the Saltstone Disposal Facility (SDF) at the Savannah River Site (SRS) as part of consultation and monitoring, respectively. Differences in inventories, waste forms,more » and key barriers led to different areas of focus in the NRC reviews of these two activities at the SRS. Because of the key role of chemically reducing grouts in both applications, the evaluation of chemical barriers was significant to both reviews. However, radionuclide solubility in precipitated metal oxides is expected to play a significant role in FTF performance whereas release of several key radionuclides from the SDF is controlled by sorption or precipitation within the cementitious wasteform itself. Similarly, both reviews included an evaluation of physical barriers to flow, but differences in the physical configurations of the waste led to differences in the reviews. For example, NRC's review of the FTF focused on the modeled degradation of carbon steel tank liners while the staff's review of the SDF performance included a detailed evaluation of the physical degradation of the saltstone wasteform and infiltration-limiting closure cap. Because of the long time periods considered (i.e., tens of thousands of years), the NRC reviews of both facilities included detailed evaluation of the engineered chemical and physical barriers. The NRC staff reviews of residual waste disposal in the FTF and salt waste disposal in the SDF focused on physical barriers to flow and chemical barriers to radionuclide release from the waste. Because the waste inventory and concentration at both sites is sufficient to generate unacceptable doses to an off-site member of the public or inadvertent intruder in the absence of engineered barriers, the NRC staff review focused on the engineering features DOE plans to put in place to limit radionuclide release. At the FTF, DOE expects that peak doses are delayed beyond a 10,000 year performance period by a combination of (1) the flow-limiting effect of the steel tank liner and (2) chemical conditions created by the stabilizing grout overlying the waste that limit the solubility of key radionuclides for tens of thousands of years. At the SDF, DOE expects that flow will be significantly limited by water shedding along the closure cap lower drainage layer and that radionuclide release will be further limited by radionuclide precipitation or sorption within the high pH, chemically reducing conditions created within the saltstone waste form. Because the performance of both facilities depends on the performance of engineered barriers for thousands of years, the reviews included a detailed evaluation of the expected long-term behavior of these barriers. As previously discussed, NRC staff reviews of DOE waste determinations during consultation are designed to evaluate the three NDAA criteria, whereas the review of an updated PA during monitoring only addresses whether the NRC staff has reasonable assurance that the planned disposal action will meet the performance objectives of 10 CFR Part 61. The NRC staff review of the Waste Determination for the FTF did not include conclusions about whether the planned disposal of residual waste at the FTF would meet the NDAA criteria because of the substantial uncertainties in the degree of waste removal DOE would achieve and other technical uncertainties. The main product of the NRC staff review of the planned FTF disposal action is the recommendation that DOE should conduct waste release experiments to increase support for key modeling assumptions related to: (1) the evolution of pH and Eh in the grouted tank system over time; (2) identification of HRR association with solid phases comprising the residual wastes; and (3) expected solubility of HRRs under a range of environmental or service conditions that the residual wastes in the contaminated zone are expected to be exposed to over time. Implementation of this recommendation is deemed crucial for NRC staff to have reasonable assurance that the performance objectives in 10 CFR Part 61, Subpart C can be met. Given the risk-significance of Tank 18 to the overall PA and the short timeline for closure of this tank, the NRC staff recommended that DOE should initiate discussions with NRC staff regarding implementation of this recommendation for Tank 18 as soon as practical. The NRC staff also recommended that experiments to address this recommendation should be conducted prior to final closure of Tank 18. Results of the Tank 18 residual waste experiments, if conducted, will be evaluated by NRC staff to determine the need for additional data collection, experiments, and modeling for Tank 18, as well as other FTF tanks. Additional information regarding the NRC staff's recommendations in this area, including details on the suggested implementation of other recommendations will be provided in the NRC staff's plan for monitoring the FTF later in FY 2012, after DOE makes a final decision on the waste determination. The NRC staff's review of waste disposal at the SDF is ongoing. When complete, the SDF TER will indicate whether the NRC staff continues to have reasonable assurance that waste disposal at the SDF will meet the performance objectives of 10 CFR Part 61 (NDAA Criterion 3). The TER also will include risk insights that will form the basis of the NRC staff's revised monitoring plan for the SDF. The NRC staff will publish an updated monitoring plan for the SDF later in FY 2012. (authors)« less
77 FR 33237 - Temporary Closures of Public Land in Washoe County, NV
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-05
...As authorized under the provisions of the Federal Land Policy and Management Act of 1976, 43 U.S.C. 1701 et seq., and pursuant to 43 CFR 8364.1, certain public land near Stead, Nevada, will be temporarily closed to all public use to provide for public safety during the 2012 Reno Air Racing Association Pylon Racing Seminar and the Reno National Championship Air Races.
78 FR 27992 - Notice of Temporary Closures of Public Land in Washoe County, NV
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-13
...As authorized under the provisions of the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) Carson City District Office will temporarily close certain public land near Stead, Nevada, to all public use to provide for public safety during the 2013 Reno Air Racing Association Pylon Racing Seminar and the Reno National Championship Air Races.
AFMC Civilian Retention: Forecasting Policy on the Future of the Civilian Workforce
2006-03-01
encourage the expansion of flexible work schedules, job sharing, part-time employment , alternative work schedules, telecommuting , and satellite work...Daft & Steers, 1986). If a person is not receiving the same perceived benefits as another, he may feel inequity which leads to dissatisfaction (Daft... drawbacks were that the commission worked in a vacuum without guidance and faulty data. The Defense Base Closure and Realignment Act of 1990
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... (Pub. L. 94-409) (5 U.S.C. 552b) I, Isaac Fulwood, of the United States Parole Commission, was present... following Commissioners voted that the meeting be closed: Isaac Fulwood, Cranston J. Mitchell, Patricia..., 2011. Isaac Fulwood, Chairman, U.S. Parole Commission. [FR Doc. 2011-33524 Filed 12-27-11; 4:15 pm...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-24
...; (Pub. L. 94-409) (5 U.S.C. 552b) I, Isaac Fulwood, Chairman of the United States Parole Commission, was... carried, the following Commissioners voted that the meeting should be closed: Isaac Fulwood, Cranston J... the meeting and authorize this record to be made available to the public. Dated: May 21, 2012. Isaac...
ERIC Educational Resources Information Center
Patrick, Robert
2008-01-01
Warrior Elementary is a pubic school within the Navajo Nation. District and school reforms fought against school closure or private restructuring due to pressures associated with repeated failure on standardized tests under the 2001 No Child Left Behind (NCLB) Act. Warrior Elementary saw tremendous academic gains on these tests one year after a…
Proposed Closure of Myrtle Beach AFB, South Carolina
1990-07-01
pesticides to provide greater protection to humans and the environment. * Comprehensive Environmental Response, Compensation and Liability Act, as amended...UST testing done by subordinate elements. Pesticides /Herbicides. A variety of chemicals are also used at Myrtle AFB to control pest infestations and...ground foliage. A list of the pesticides and herbicides stored on the base is included as part of Annex I of the Myrtle Beach AFB SPRP (April 1987) under
Recharge Data Package for Hanford Single-Shell Tank Waste Management Areas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fayer, Michael J.; Keller, Jason M.
2007-09-24
Pacific Northwest National Laboratory (PNNL) assists CH2M HILL Hanford Group, Inc., in its preparation of the Resource Conservation and Recovery Act (RCRA) Facility Investigation report. One of the PNNL tasks is to use existing information to estimate recharge rates for past and current conditions as well as future scenarios involving cleanup and closure of tank farms. The existing information includes recharge-relevant data collected during activities associated with a host of projects, including those of RCRA, the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), the CH2M HILL Tank Farm Vadose Zone Project, and the PNNL Remediation and Closure Science Project.more » As new information is published, the report contents can be updated. The objective of this data package was to use published data to provide recharge estimates for the scenarios being considered in the RCRA Facility Investigation. Recharge rates were estimated for areas that remain natural and undisturbed, areas where the vegetation has been disturbed, areas where both the vegetation and the soil have been disturbed, and areas that are engineered (e.g., surface barrier). The recharge estimates supplement the estimates provided by PNNL researchers in 2006 for the Hanford Site using additional field measurements and model analysis using weather data through 2006.« less
Anillin acts as a bifunctional linker coordinating midbody ring biogenesis during cytokinesis
Kechad, Amel; Jananji, Silvana; Ruella, Yvonne; Hickson, Gilles R. X.
2013-01-01
Summary Animal cell cytokinesis proceeds via constriction of an actomyosin-based contractile ring (CR) [1, 2]. Upon reaching a diameter of ~1 μm [3], a midbody ring (MR) forms to stabilize the intercellular bridge until abscission [4-6]. How MR formation is coupled to CR closure and how plasma membrane anchoring is maintained at this key transition is unknown. Time-lapse microscopy of Drosophila S2 cells depleted of the scaffold protein, Anillin [7-9], revealed that Anillin is required for complete closure of the CR and formation of the MR. Truncation analysis revealed that Anillin N-termini connected with the actomyosin CR and supported formation of stable MR-like structures, but these could not maintain anchoring of the plasma membrane. Conversely, Anillin C-termini failed to connect with the CR or MR but recruited the septin, Peanut, to ectopic structures at the equatorial cortex. Peanut depletion mimicked truncation of the Anillin C-terminus, resulting in MR-like structures that failed to anchor the membrane. These data demonstrate that Anillin coordinates the transition from CR to MR, and that it does so by linking two distinct cortical cytoskeletal elements. One apparently acts as the core structural template for MR assembly, while the other ensures stable anchoring of the plasma membrane beyond the CR stage. PMID:22226749
Styrczewska, Monika; Kostyn, Anna; Kulma, Anna; Majkowska-Skrobek, Grazyna; Augustyniak, Daria; Prescha, Anna; Czuj, Tadeusz; Szopa, Jan
2015-01-01
Inflammation is the basis of many diseases, with chronic wounds amongst them, limiting cell proliferation and tissue regeneration. Our previous preclinical study of flax fiber applied as a wound dressing and analysis of its components impact on the fibroblast transcriptome suggested flax fiber hydrophobic extract use as an anti-inflammatory and wound healing preparation. The extract contains cannabidiol (CBD), phytosterols, and unsaturated fatty acids, showing great promise in wound healing. In in vitro proliferation and wound closure tests the extract activated cell migration and proliferation. The activity of matrix metalloproteinases in skin cells was increased, suggesting activation of extracellular components remodeling. The expression of cytokines was diminished by the extract in a cannabidiol-dependent manner, but β-sitosterol can act synergistically with CBD in inflammation inhibition. Extracellular matrix related genes were also analyzed, considering their importance in further stages of wound healing. The extract activated skin cell matrix remodeling, but the changes were only partially cannabidiol- and β-sitosterol-dependent. The possible role of fatty acids also present in the extract is suggested. The study shows the hydrophobic flax fiber components as wound healing activators, with anti-inflammatory cannabidiol acting in synergy with sterols, and migration and proliferation promoting agents, some of which still require experimental identification. PMID:26347154
Flood-inundation maps for the St. Marys River at Decatur, Indiana
Strauch, Kellan R.
2015-08-24
The availability of these maps and associated Web mapping tools, along with the current river stage from USGS streamgages and forecasted flood stages from the NWS, provides emergency managers and residents with information that may be critical for flood-emergency planning and flood response activities such as evacuations and road closures, as well as for post-flood recovery efforts.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-03
..., Shrimp, and Coral and Coral Reefs Fishery Management Plans for the Gulf of Mexico (Generic ACL Amendment.... 100217097-1757-02] RIN 0648-XC981 Reef Fish Fishery of the Gulf of Mexico; 2013 Accountability Measure [email protected] . SUPPLEMENTARY INFORMATION: The reef fish fishery of the Gulf, which includes hogfish, is...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-21
... effective 12:01 a.m., local time on July 1, 2012, until 12:01 a.m., local time on January 1, 2013. ADDRESSES: Electronic copies of documents supporting the final temporary rule implementing gray triggerfish management... . SUPPLEMENTARY INFORMATION: The reef fish fishery of the Gulf is managed under the Fishery Management Plan for...
26 CFR 1.410(b)-10 - Effective dates and transition rules.
Code of Federal Regulations, 2014 CFR
2014-04-01
... amended by section 1112 of the Tax Reform Act of 1986 apply to plan years beginning on or after January 1... provided for by section 1112(e)(2) of the Tax Reform Act of 1986, in the case of a plan maintained pursuant... 1112 of the Tax Reform Act of 1986 do not apply to employees covered by any such agreement in plan...
26 CFR 1.410(b)-10 - Effective dates and transition rules.
Code of Federal Regulations, 2012 CFR
2012-04-01
... by section 1112 of the Tax Reform Act of 1986 apply to plan years beginning on or after January 1... provided for by section 1112(e)(2) of the Tax Reform Act of 1986, in the case of a plan maintained pursuant... 1112 of the Tax Reform Act of 1986 do not apply to employees covered by any such agreement in plan...
26 CFR 1.410(b)-10 - Effective dates and transition rules.
Code of Federal Regulations, 2013 CFR
2013-04-01
... amended by section 1112 of the Tax Reform Act of 1986 apply to plan years beginning on or after January 1... provided for by section 1112(e)(2) of the Tax Reform Act of 1986, in the case of a plan maintained pursuant... 1112 of the Tax Reform Act of 1986 do not apply to employees covered by any such agreement in plan...
26 CFR 1.410(b)-10 - Effective dates and transition rules.
Code of Federal Regulations, 2011 CFR
2011-04-01
... amended by section 1112 of the Tax Reform Act of 1986 apply to plan years beginning on or after January 1... provided for by section 1112(e)(2) of the Tax Reform Act of 1986, in the case of a plan maintained pursuant... 1112 of the Tax Reform Act of 1986 do not apply to employees covered by any such agreement in plan...
Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the Corrective Action Unit No. 426, which includes the Cactus Spring Waste Trenches, located at the Tonopah Test Range. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or withoutmore » remediation), or no further action. The scope of this investigation will include drilling and collecting subsurface samples from within and below the trenches. Sampling locations will be biased toward the areas most likely to be contaminated. The Cactus Spring Waste Trenches Site is identified as one of three potential locations for buried, radioactively contaminated materials from the Double Tracks Test. This test was the first of four storage-transportation tests conducted in 1963 as part of Operation Roller Coaster. The experiment involved the use of live animals to assess the inhalation intake of a plutonium aerosol.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick; Burmeister, Mark
2014-04-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 squaremore » miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-20
... Clean Air Act and the Emergency Planning and Community Right- To Know Act'' On September 30, 2013, the... lawsuit filed under the Clean Air Act and the Emergency Planning & Community Right to Know Act, the United... would receive comments concerning the settlement for a period of thirty (30) days from the date of...
Su, Y C; Maurel-Zaffran, C; Treisman, J E; Skolnik, E Y
2000-07-01
We have previously shown that the Ste20 kinase encoded by misshapen (msn) functions upstream of the c-Jun N-terminal kinase (JNK) mitogen-activated protein kinase module in Drosophila. msn is required to activate the Drosophila JNK, Basket (Bsk), to promote dorsal closure of the embryo. A mammalian homolog of Msn, Nck interacting kinase, interacts with the SH3 domains of the SH2-SH3 adapter protein Nck. We now show that Msn likewise interacts with Dreadlocks (Dock), the Drosophila homolog of Nck. dock is required for the correct targeting of photoreceptor axons. We have performed a structure-function analysis of Msn in vivo in Drosophila in order to elucidate the mechanism whereby Msn regulates JNK and to determine whether msn, like dock, is required for the correct targeting of photoreceptor axons. We show that Msn requires both a functional kinase and a C-terminal regulatory domain to activate JNK in vivo in Drosophila. A mutation in a PXXP motif on Msn that prevents it from binding to the SH3 domains of Dock does not affect its ability to rescue the dorsal closure defect in msn embryos, suggesting that Dock is not an upstream regulator of msn in dorsal closure. Larvae with only this mutated form of Msn show a marked disruption in photoreceptor axon targeting, implicating an SH3 domain protein in this process; however, an activated form of Msn is not sufficient to rescue the dock mutant phenotype. Mosaic analysis reveals that msn expression is required in photoreceptors in order for their axons to project correctly. The data presented here genetically link msn to two distinct biological events, dorsal closure and photoreceptor axon pathfinding, and thus provide the first evidence that Ste20 kinases of the germinal center kinase family play a role in axonal pathfinding. The ability of Msn to interact with distinct classes of adapter molecules in dorsal closure and photoreceptor axon pathfinding may provide the flexibility that allows it to link to distinct upstream signaling systems.
Su, Yi-Chi; Maurel-Zaffran, Corinne; Treisman, Jessica E.; Skolnik, Edward Y.
2000-01-01
We have previously shown that the Ste20 kinase encoded by misshapen (msn) functions upstream of the c-Jun N-terminal kinase (JNK) mitogen-activated protein kinase module in Drosophila. msn is required to activate the Drosophila JNK, Basket (Bsk), to promote dorsal closure of the embryo. A mammalian homolog of Msn, Nck interacting kinase, interacts with the SH3 domains of the SH2-SH3 adapter protein Nck. We now show that Msn likewise interacts with Dreadlocks (Dock), the Drosophila homolog of Nck. dock is required for the correct targeting of photoreceptor axons. We have performed a structure-function analysis of Msn in vivo in Drosophila in order to elucidate the mechanism whereby Msn regulates JNK and to determine whether msn, like dock, is required for the correct targeting of photoreceptor axons. We show that Msn requires both a functional kinase and a C-terminal regulatory domain to activate JNK in vivo in Drosophila. A mutation in a PXXP motif on Msn that prevents it from binding to the SH3 domains of Dock does not affect its ability to rescue the dorsal closure defect in msn embryos, suggesting that Dock is not an upstream regulator of msn in dorsal closure. Larvae with only this mutated form of Msn show a marked disruption in photoreceptor axon targeting, implicating an SH3 domain protein in this process; however, an activated form of Msn is not sufficient to rescue the dock mutant phenotype. Mosaic analysis reveals that msn expression is required in photoreceptors in order for their axons to project correctly. The data presented here genetically link msn to two distinct biological events, dorsal closure and photoreceptor axon pathfinding, and thus provide the first evidence that Ste20 kinases of the germinal center kinase family play a role in axonal pathfinding. The ability of Msn to interact with distinct classes of adapter molecules in dorsal closure and photoreceptor axon pathfinding may provide the flexibility that allows it to link to distinct upstream signaling systems. PMID:10848599
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-06
... for OMB Review; Comment Request; Planning Guidance and Instructions for Submission of the Strategic... for Submission of the Strategic State Plan and Plan Modifications for Title I of the Workforce Investment Act and Wagner-Peyser Act,'' as proposed to be revised, to the Office of Management and Budget...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-05-01
This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specifiedmore » in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.« less
Authority defied: need for cognitive closure influences regulatory control when resisting authority.
Damen, Tom G E; van Leeuwen, Matthijs L; Dijksterhuis, Ap; van Baaren, Rick B
2014-08-01
The present studies examined whether differences in need for cognitive closure (NCC) were related to differences in regulatory control when confronted with authority. In two studies, levels of regulatory control were measured when participants resisted (Study 1; N = 46) or prepared to resist the influence attempt of an authority figure (Study 2; N = 50). Results showed that resisting the influence attempt from a high-authority figure was more depleting for participants higher in NCC compared to individuals lower in NCC. However, when they were given instructions and time to prepare the act of resistance, individuals high in NCC actually showed an increase in regulatory control. Authority is usually viewed as a general principle of influence; however, the present studies suggest that there are individual differences that influence how people may experience interactions with authorities. © 2013 Wiley Periodicals, Inc.
Soydan, Sıdıka Sinem; Uckan, Sina
2014-02-01
Bisphosphonate-related osteonecrosis of the jaw (BRONJ) is a challenging complication resulting from the long-term application of bisphosphonates. In most cases, BRONJ occurs after a surgical procedure involving the jawbone. Currently, the management of BRONJ remains controversial, and there is no definitive treatment other than palliative methods. Platelet-rich fibrin (PRF) represents a relatively new biotechnology for the stimulation and acceleration of tissue healing and bone regeneration. This technical note describes the total closure of moderate bone exposure in persistent BRONJ in 2 weeks with a double-layer PRF membrane. PRF may stimulate gingival healing and act as a barrier membrane between the alveolar bone and the oral cavity. PRF may offer a fast, easy, and effective alternative method for the closure of bone exposure in BRONJ. Copyright © 2014 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick; Burmeister, Mark
2016-05-01
The purpose of this CAP is to provide the plan for implementation of the recommended corrective action alternatives (CAAs) for CAU 568. Site characterization activities were performed in 2014, and the results are presented in Appendix A of the CAU 568 CADD. The CAAs were recommended in the CADD. The scope of work required to implement the recommended CAAs of closure in place and clean closure at 11 of the 14 CASs includes the following: The installation of physical barriers over the nine safety experiment ground zeroes to cover contamination at CASs 03-23-20 (Otero), 03-23-23 (San Juan and Pascal-C), 03-23-31more » (Pascal-B, Luna, Colfax), 03-23-32 (Pascal-A), 03-23-33 (Valencia), and 03-23-34 (Chipmunk); the characterization and removal of three soil and debris piles at CAS 03-08-04, and one HCA soil pile at CAS 03-23-30; the removal of three steel well head covers (PSM) from CASs 03-23-20 (Otero), 03-23-31 (Luna), and 03-23-33 (Valencia); the removal of soil and lead PSM from two locations at CAS 03-26-04; Implementation of FFACO use restrictions at nine safety experiment ground zeroes at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; the steel well head cover at CAS 03-23-23; the areas meeting HCA conditions at CASs 03-23-19 and 03-23-31; and the Boomer crater area at CAS 03-45-01. The FFACO use restriction boundaries will be presented in the CAU 568 closure report.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... DEPARTMENT OF JUSTICE Notice of Lodging of Settlement Agreement Under the Resource Conservation and Recovery Act and the Emergency Planning and Community Right-to-Know Act Notice is hereby given... Planning and Community Right-to-Know Act (``EPCRA''), 42 U.S.C. 11001, et seq. The Complaint alleges that...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-25
... DEPARTMENT OF JUSTICE Notice of Lodging of Settlement Agreement Under the Resource Conservation And Recovery Act and the Emergency Planning and Community Right-to-Know Act Notice is hereby given... Recovery Act (``RCRA''), 42 U.S.C. 6901, et seq., and the Emergency Planning and Community Right-to-Know...
Surgical Techniques at Cesarean Delivery: A U.S. Survey
Lyell, Deirdre J.; Power, Michael; Murtough, Katie; Ness, Amen; Anderson, Britta; Erickson, Kristine; Schulkin, Jay
2016-01-01
Objective To assess the frequency of surgical techniques at cesarean delivery (CD) among U.S. obstetricians. Methods Members of the American College of Obstetrician Gynecologists were randomly selected and e-mailed an online survey that assessed surgical closure techniques, demographics, and reasons. Data were analyzed using SPSS (IBM Corp., Armonk, New York, United States), descriptive statistics, and analysis of variance. Results Our response rate was 53%, and 247 surveys were analyzed. A similar number of respondents either “always or usually” versus “rarely or never” reapproximate the rectus muscles (38.4% versus 43.3%, p = 0.39), and close parietal peritoneum (42.5% versus 46.9%, p = 0.46). The most frequently used techniques were double-layer hysterotomy closure among women planning future children (73.3%) and suturing versus stapling skin (67.6%); the least frequent technique was closure of visceral peritoneum (12.2%). Surgeons who perform double-layer hysterotomy closure had fewer years in practice (15.0 versus 18.7 years, p = 0.021); surgeons who close visceral peritoneum were older (55.5 versus 46.4 years old, p < 0.001) and had more years in practice (23.8 versus 13.8 years practice; p < 0.001). Conclusion Similar numbers of obstetricians either reapproximate or leave open the rectus muscles and parietal peritoneum at CD, suggesting that wide variation in practice exists. Surgeon demographics and safety concerns play a role in some techniques. PMID:28825004
NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2015
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nikolich, George; Mizell, Steve; McCurdy, Greg
Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. The emphasis of the work is on collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans thatmore » are being developed, which will facilitate the appropriate closure design and post-closure monitoring. In 2011, DRI installed two meteorological monitoring stations south (station #1) and north (station #2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters are recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during fiscal year (FY) 2015.« less
1989-01-01
Among other things, this US Act makes appropriations for foreign operations, export financing, and related programs. With respect to these appropriations, it does the following: 1) prohibits funding for coercive abortion or forced sterilization as part of bilateral development and population planning assistance; 2) prohibits the use of funds appropriated under the Act to lobby for abortion; and 3) prohibits the use of development assistance funds to pay for abortions or involuntary sterilizations as a method of family planning or to motivate or coerce any persons to practice abortions or undergo sterilization, or any biomedical research concerning abortions or involuntary sterilization as a method of family planning. The Act also reaffirms the congressional commitment to population planning, development assistance, and the need for informed voluntary family planning.
Fat-plug myringoplasty of ear lobule vs abdominal donor sites.
Acar, Mustafa; Yazıcı, Demet; San, Turhan; Muluk, Nuray Bayar; Cingi, Cemal
2015-04-01
The purpose of this study is to compare the success rates of fat-graft myringoplasties harvesting adipose grafts from different donor sites (ear lobule vs abdomen). The clinical records of 61 patients (24 males and 37 females) who underwent fat-plug myringoplasty (FPM) were reviewed retrospectively. Fat from ear lobule (FEL) and abdominal fat were used as graft materials. The impact of age, gender, systemic diseases, topography of the perforation, utilization of fat graft materials of different origin on the tympanic membrane closure rate and the effect of FPM on hearing gain was analyzed. Our tympanic membrane (TM) closure rate was 82 %. No statistical significant difference was observed regarding age, gender, comorbidities (septal deviation, hypertension and diabetes mellitus) or habits (smoking). Posterior TM perforations had significantly lower healing rate. The change in TM closure rate considering different adipose tissue donor sites was not statistically significant. The hearing gain of the patients was mostly below 20 dB. Fat-plug myringoplasty (FPM) is a safe, cost-effective and easy operation for selected patients. Abdominal fat graft is as effective as ear lobe fat graft on tympanic membrane healing, has cosmetic advantages and should be taken into consideration when planning fat as the graft source.
Fetal omphalocele ratios predict outcomes in prenatally diagnosed omphalocele.
Montero, Freddy J; Simpson, Lynn L; Brady, Paula C; Miller, Russell S
2011-09-01
The objective of the study was to evaluate whether ratios considering omphalocele diameter relative to fetal biometric measurements perform better than giant omphalocele designation at predicting inability to achieve neonatal primary surgical closure. Cases of fetal omphalocele that underwent evaluation between May 2003 and July 2010 were identified. Inclusion was restricted to live births with plan for postnatal repair. Omphalocele diameter upon antenatal ultrasound was compared with abdominal circumference, femur length, and head circumference, yielding the respective omphalocele (O)/abdominal circumference (AC), O/femur length (FL), and O/head circumference (HC) ratios. The absolute measurements were used to classify giant lesions. Omphalocele ratios and giant omphalocele designations were evaluated as predictors of inability to achieve primary repair. Among 25 included cases, staged or delayed closure occurred in 52%. With an optimal cutoff of 0.21 or greater, O/HC best predicted the primary outcome (sensitivity, 84.6%; specificity, 58.3%; odds ratio, 7.7). The O/HC of 0.21 or greater outperformed giant designations. The O/HC of 0.21 or greater best predicted staged or delayed omphalocele closure. Giant omphalocele designation, regardless of definition, poorly predicted outcome. Copyright © 2011 Mosby, Inc. All rights reserved.
NASA Astrophysics Data System (ADS)
Cogne, J.; Kravchinsky, V.; Gilder, S.; Hankard, F.
2005-12-01
The Paleozoic Mongol-Okhotsk Ocean separated the Siberian craton to the north from a landmass composed of Amuria, Tarim, Qaidam, Tibet and the North and South China blocks to the south. Based on a comparison of paleomagnetic data from the NCB with the Eurasian apparent polar wander path, this ocean closed by the beginning of the Cretaceous. We present here a review of recent paleomagnetic studies of Late Permian to Early Cretaceous formations from the Transbaikal area of south Siberia, coming from localities situated on both sides of the Mongol-Okhotsk suture zone. The main conclusions that we draw from these studies are as follows. (1) A Late Permian ~4500 km latitude difference indeed existed between Amuria and the Siberia blocks at 110°E longitude. (2) In Middle-Late Jurassic times, a 1700 to 2700 km paleolatitudinal gap still existed between the two blocks. This contradicts geological interpretations of a Middle Jurassic closure of the ocean at this longitude. (3) Consistency of Early Cretaceous paleolatitudes from both sides of the suture demonstrates the closure of the ocean at that time. Altogether, these suggest a quite fast closure between the Middle Jurassic and the Early Cretaceous, at about 15±11 cm/yr. Finally, all pre-Late Cretaceous paleomagnetic poles appear to be distributed along small-circles centered on site localities. We think this is due to continued deformation acting in the Mongol-Okhotsk suture region related to suturing. Conversely, the post-Early Cretaceous rotations may be related to Tertiary deformation under the effect of the India-Asia collision.
Request for Correction 15003 - Information Quality Act request for Correction of the TSCA Work Plan
This RFC concerns the Information Quality Act request for correction of the TSCA Work Plan for Chemical Assessments: 20154 Update and the TSCA Work Plan Chemicals: Methods Document (February 2012) regarding assessment of phthalic anhydride
78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-24
... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...
78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-10
... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CASmore » 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal waste in the form of fluorescent light bulbs; and approximately 0.5 yd{sup 3} of low-level waste in the form of a radiologically impacted fire hose rack were generated, managed, and disposed of appropriately. Waste minimization techniques, such as the utilization of laboratory analysis and field screening to guide the extent of excavations, were employed during the performance of closure work.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2013-06-27
This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Securitymore » Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NFO for closure of CAU 104 · The transfer of CAU 104 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less
2012-08-01
include the tactical delivery of air-to-ground munitions, laser designation of targets from ground and airborne platforms, and threat evasion. These...world events, which include the tactical delivery of air-to-ground munitions, laser designation of targets from ground and airborne platforms, and...Closure CAA Clean Air Act CAU Classic Associate Unit CEQ Council on Environmental Quality CFR Code of Federal Regulations CO carbon monoxide
Military Base Realignments and Closures: Updated Costs and Savings Estimates from BRAC 2005
2012-06-29
AK 14.2 Realign medical functions at McChord Air Force Base, WA 13.7 Realign commodity management privatization 13.5 Close Kulis Air Guard...Realignment Act of 1990 by inserting a new section, § 2913, which established “military value” as the primary consideration for BRAC recommendations...Close Fort Monmouth, New Jersey ($1.1 billion increase). This recommendation closed Fort Monmouth and realigned various functions such as information
ERIC Educational Resources Information Center
Illinois Community College Board, 2014
2014-01-01
This document contains Illinois' State Plan for Adult Education and Family Literacy under Title II of the Workforce Investment Act of 1998 for July 1, 1999, through June 30, 2015. The plan is comprised of the following sections: (1) Eligible agency certifications and assurances; (2) Description of the steps to ensure direct and equitable access;…
Perceived stops to suicidal thoughts, plans, and actions in persons experiencing psychosis.
Gooding, P A; Sheehy, K; Tarrier, N
2013-01-01
Suicide has been conceived as involving a continuum, whereby suicidal plans and acts emerge from thoughts about suicide. Suicide prevention strategies need to determine whether different responses are needed at these points on the continuum. This study investigates factors that were perceived to counter suicidal ideation, plans, and acts. The 36 participants, all of whom had had experiences of psychosis and some level of suicidality, were presented with a vignette describing a protagonist with psychotic symptoms. They were asked to indicate what would counter the suicidal thoughts, plans, and acts of the protagonist described in the vignette. Qualitative techniques were first used to code these free responses into themes/categories. Correspondence analysis was then applied to the frequency of responses in each of these categories. Social support was identified as a strong counter to suicidal ideation but not as a counter to suicidal plans or acts. Help from health professionals was strongly related to the cessation of suicidal plans as were the opinions of the protagonist's children. Changing cognitions and strengthening psychological resources were more weakly associated with the cessation of suicidal ideation and plans. The protagonist's children were considered potentially helpful in addressing suicidal acts. These results suggest that both overlapping and nonoverlapping factors need to be considered in understanding suicide prevention, dependent on whether individuals are thinking about, planning, or attempting suicide.
2015-12-18
This document contains final regulations on the health insurance premium tax credit enacted by the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010, as amended by the Medicare and Medicaid Extenders Act of 2010, the Comprehensive 1099 Taxpayer Protection and Repayment of Exchange Subsidy Overpayments Act of 2011, and the Department of Defense and Full-Year Continuing Appropriations Act, 2011. These final regulations affect individuals who enroll in qualified health plans through Affordable Insurance Exchanges (Exchanges, sometimes called Marketplaces) and claim the health insurance premium tax credit, and Exchanges that make qualified health plans available to individuals and employers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farnham, Irene
This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigationmore » (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-15
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The ``Criteria for Developing Refuge Water Management Plans'' (Refuge...
Sexual Orientation and U.S. Military Personnel Policy: An Update of RAND’s 1993 Study
2010-01-01
Klepinger, “The Sexual Behavior of Men in the United States,” Family Planning Perspectives, Vol. 25, No. 2, 1993, pp. 52–60. Black, D., Gary Gates, Seth ...Kestnbaum, “Professional Closure in the Military Labor Market: A Critique of Pure Cohesion,” in D. M. Snider and G. L. Watkins , eds., The Future of
DOT National Transportation Integrated Search
2007-05-01
This paper evaluates impact of various I-15 reconstruction closure scenarios on the travelers in Ogden area. The purpose of the research was to investigate impact of the scenarios and facilitate decision about future maintenance of traffic during the...
Base Realignment and Closure Environmental Evaluation (BRAC EE) Fort Devens, Massachusetts
1995-09-01
Not Sampled ......... 6 2.3.2 Transformer Sites Sampled ........................ 7 2.4 Soil Sampling Protocol and Analytical Program ...Evaluation (AREE) 66. The study included evaluating the current PCB Transformer Management Program administered by the Fort Devens Environmental Management...Office (EMO), the Fort Devens Spill Contingency Plan, and the ongoing transformer inspection program . Personnel in both the Fort Devens EMO and the Fort
A Comparative History of Department of Defense Management Reform from 1947 to 2005
2006-12-01
type of management reform agenda to improve the Department of Defense business processes and incorporate recent management ideas from the business ...introduce some type of management reform agenda to improve the Department of Defense business processes and incorporate recent management ideas...Steering Group BMMP Business Management Modernization Plan BRAC Base Realignment and Closure C3I Command, Control, Communications, and Intelligence
Report on 2005 Defense Base Closure and Realignment Implementation
2011-09-01
been agreed to by the redevelopment authority? Yes Description of redevelopment plan: Education Conveyance to Texarkana College. Quantity of...1993 1998 2008 1995 2014 2014 2002 2016 2010 2011 2012 20252013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2024...1996 2001 2008 2008 1990 2008 2008 2008 2010 2011 2012 20252013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2024
The Installation Funding Dilemma
2008-04-04
role in supporting the Army’s plans for supporting base realignment and closure (BRAC) requirements, global defense posture realignment ( GDPR ...relation to their affect on installation management funding. First, the initiative known as the GDPR will return many units to the United States from...three initiatives ( GDPR , BRAC and Modularity) and certain other restationing moves, the Army expects a net gain of about 154,000 personnel at its domestic
Installation Management Command: How is the Command Supporting the Army Plan?
2007-03-27
BRAC), Global Defense Posture Realignment ( GDPR ), and Army Modular Force (AMF). IMCOM will continue to consolidate installations functions to free up...This restationing effort resides in three initiatives: Base Realignment and Closure (BRAC), Global Defense Posture Realignment ( GDPR ), and the Army...training on our installations.”36 The GDPR consolidates forces returning from overseas into selected CONUS installations. AMF has restructured the
76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-22
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and subsequent...
NASA Astrophysics Data System (ADS)
Kunath, P.; Chi, W. C.; Berndt, C.; Liu, C. S.
2016-12-01
We have used 3D P-Cable seismic data from Four-Way-Closure Ridge, a NW-SE trending anticlinal ridge within the lower slope domain of accretionary wedge, to investigate the geological constraints influencing the fluid migration pattern in the shallow marine sediments. In the seismic data, fluid migration feature manifests itself as high reflection layers of dipping strata, which originate underneath a bottom simulating reflector (BSR) and extend towards the seafloor. Shoaling of the BSR near fluid migration pathways indicates a focused fluid flux, perturbing the temperature field. Furthermore, seafloor video footage confirmed the presence of recent methane seepage above seismically imaged fluid migration pathways. We plan to test two hypotheses for the occurrence of these fluid migration pathways: 1) the extensional regime under the anticlinal ridge crest caused the initiation of localized fault zones, acting as fluid conduits in the gas hydrate stability zone (GHSZ). 2) sediment deformation induced by focused fluid flow and massive growth and dissolution of gas hydrate, similar to processes controlling the evolution of pockmarks on the Nigerian continental margin. We suggest that these processes may be responsible for the formation of a massive hydrate core in the crest of the anticline, as inferred from other geophysical datasets. Triggering process for fluid migration cannot be clearly defined. However, the existence of blind thrust faults may help to advect deep-seated fluids. This may be augmented by biogenic production of shallow gas underneath the ridge, where the excess of gas enables the coexistence of gas, water, and gas hydrate within the GHSZ. Fluid migration structures may exists because of the buoyancy of gas-bearing fluids. This study shows a potential model on how gas-bearing fluids migrate upward towards structural highs, which might occur in other anticlinal structures around the world. Keywords: P-Cable, gas-hydrate, fluid flow, fault-related fold, methane seepage
75 FR 6696 - Draft Recovery Plan for Tidal Marsh Ecosystems of Northern and Central California
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-10
... Recovery Plan. The plan also addresses several federally endangered plant species: Cirsium hydrophilum var... animals and plants is a primary goal of the Endangered Species Act (Act) (16 U.S.C. 1531 et seq.) and our... five endangered species. The biology of these species is at the core of the draft recovery plan, but...
Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan
Dan Bremer
2007-01-01
The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-05
... least two multi-State plans (MSPs) on each of the Affordable Insurance Exchanges (Exchanges). Under the... issuers to offer at least two multi-State plans (MSPs) on each of the Exchanges in the 50 States and the... Patient Protection and Affordable Care Act; Establishment of the Multi- State Plan Program for the...
40 CFR 130.5 - Continuing planning process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.5 Continuing planning process. (a) General. Each State shall... the Act. Each State is responsible for managing its water quality program to implement the processes... quality standards in effect under authority of section 303 of the Act. (2) The process for incorporating...
40 CFR 130.5 - Continuing planning process.
Code of Federal Regulations, 2011 CFR
2011-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.5 Continuing planning process. (a) General. Each State shall... the Act. Each State is responsible for managing its water quality program to implement the processes... quality standards in effect under authority of section 303 of the Act. (2) The process for incorporating...
40 CFR 130.5 - Continuing planning process.
Code of Federal Regulations, 2014 CFR
2014-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.5 Continuing planning process. (a) General. Each State shall... the Act. Each State is responsible for managing its water quality program to implement the processes... quality standards in effect under authority of section 303 of the Act. (2) The process for incorporating...
42 CFR 56.603 - Project elements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of the Social Security Act, obtain or make every reasonable effort to obtain a written agreement with... entitled to insurance benefits under title XVIII of the Social Security Act, to medical assistance under a State plan approved under title XIX of such Act, to social services and family planning under title XX...
Code of Federal Regulations, 2010 CFR
2010-07-01
... sections 301(b) and 306 of the Act. (k) Water quality management (WQM) plan. A State or areawide waste... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.2 Definitions. (a) The Act. The Clean Water Act, as amended, 33 U.S.C. 1251 et...
Code of Federal Regulations, 2013 CFR
2013-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES REQUIREMENTS RELATING TO HEALTH CARE ACCESS EXCHANGE ESTABLISHMENT... Care Act of 2010 (Pub. L. 111-148), as amended by the Health Care and Education Reconciliation Act of.... Catastrophic plan means a health plan described in section 1302(e) of the Affordable Care Act. Code means the...
50 CFR 84.11 - How does the Service define the terms used in this rule?
Code of Federal Regulations, 2011 CFR
2011-10-01
... wetlands conservation program authorized by the Coastal Wetlands Planning, Protection and Restoration Act... Environmental Protection Agency, and the Departments of the Interior, Agriculture, and Commerce.) Coastal... Act. The Coastal Wetlands Planning, Protection and Restoration Act of 1990 (16 U.S.C. 3951-3956...
50 CFR 84.11 - How does the Service define the terms used in this rule?
Code of Federal Regulations, 2014 CFR
2014-10-01
... wetlands conservation program authorized by the Coastal Wetlands Planning, Protection and Restoration Act... Environmental Protection Agency, and the Departments of the Interior, Agriculture, and Commerce.) Coastal... Act. The Coastal Wetlands Planning, Protection and Restoration Act of 1990 (16 U.S.C. 3951-3956...
50 CFR 84.11 - How does the Service define the terms used in this rule?
Code of Federal Regulations, 2012 CFR
2012-10-01
... wetlands conservation program authorized by the Coastal Wetlands Planning, Protection and Restoration Act... Environmental Protection Agency, and the Departments of the Interior, Agriculture, and Commerce.) Coastal... Act. The Coastal Wetlands Planning, Protection and Restoration Act of 1990 (16 U.S.C. 3951-3956...
50 CFR 84.11 - How does the Service define the terms used in this rule?
Code of Federal Regulations, 2013 CFR
2013-10-01
... wetlands conservation program authorized by the Coastal Wetlands Planning, Protection and Restoration Act... Environmental Protection Agency, and the Departments of the Interior, Agriculture, and Commerce.) Coastal... Act. The Coastal Wetlands Planning, Protection and Restoration Act of 1990 (16 U.S.C. 3951-3956...
50 CFR 84.11 - How does the Service define the terms used in this rule?
Code of Federal Regulations, 2010 CFR
2010-10-01
... wetlands conservation program authorized by the Coastal Wetlands Planning, Protection and Restoration Act... Environmental Protection Agency, and the Departments of the Interior, Agriculture, and Commerce.) Coastal... Act. The Coastal Wetlands Planning, Protection and Restoration Act of 1990 (16 U.S.C. 3951-3956...
Code of Federal Regulations, 2011 CFR
2011-07-01
... sections 301(b) and 306 of the Act. (k) Water quality management (WQM) plan. A State or areawide waste... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.2 Definitions. (a) The Act. The Clean Water Act, as amended, 33 U.S.C. 1251 et...
Code of Federal Regulations, 2010 CFR
2010-07-01
... THE CONTRACT WORK HOURS AND SAFETY STANDARDS ACT) Interpretation of the Fringe Benefits Provisions of... unfunded plans or programs in finding prevailing wages and in ascertaining compliance with the Act. At the... program must be “bona fide” and not a mere simulation or sham for avoiding compliance with the act. (See S...
Namrata; Ahmad, Shabi
2015-01-01
Introduction Gastrointestinal fistulas are serious complications and are associated with high morbidity and mortality rates. In majority of the patients, fistulas are treatable. However, the treatment is very complex and often multiple therapies are required. These highly beneficial treatment options which could shorten fistula closure time also result in considerable hospital cost savings. Aim This study was planned to study aetiology, clinical presentation, morbidity and mortality of enterocutaneous fistula and to evaluate the different surgical intervention techniques for closure of enterocutaneous fistula along with a comparative evaluation of different techniques for management of peristomal skin with special emphasis on aluminum paint, Karaya gum (Hollister) and Gum Acacia. Materials and Methods This prospective observational study was conducted in the Department of Surgery, M.L.N. Medical College, Allahabad and its associated hospital (S.R.N. Hospital, Allahabad) for a period of five years. Results Majority of enterocutaneous fistula were of small bowel and medium output fistulas (500-1000 ml/24hours). Most of the patients were treated with conservative treatment as compared to surgical intervention. Large bowel fistula has maximum spontaneous closure rate compare to small bowel and duodenum. Number of orifice whether single or multiple does not appear to play statistically significant role in spontaneous closure of fistula. Serum Albumin is a significantly important predictor of spontaneous fistula closure and mortality. Surgical management appeared to be the treatment of choice in distal bowel fistula. The application of karaya gum (Hollister kit), Gum Acacia and Aluminum Paint gave similar outcome. Conclusion Postoperative fistulas are the most common aetiology of enterocutaneous fistula and various factors do play role in management. Peristomal skin care done with Karaya Gum, Gum Acacia and Aluminum Paint has almost equal efficiency in management of skin excoriation. However, role of Gum Acacia was found to be good with inflamed, excoriated and ulcerative skin in comparison to Aluminum Paint and as efficacious as Karaya Gum but at much lower cost. PMID:26816943
Matsumoto, Masatoshi; Ogawa, Takahiko; Kashima, Saori; Takeuchi, Keisuke
2012-07-23
Frequent and long-term commuting is a requirement for dialysis patients. Accessibility thus affects their quality of lives. In this paper, a new model for accessibility measurement is proposed in which both geographic distance and facility capacity are taken into account. Simulation of closure of rural facilities and that of capacity transfer between urban and rural facilities are conducted to evaluate the impacts of these phenomena on equity of accessibility among dialysis patients. Post code information as of August 2011 of all the 7,374 patients certified by municipalities of Hiroshima prefecture as having first or third grade renal disability were collected. Information on post code and the maximum number of outpatients (capacity) of all the 98 dialysis facilities were also collected. Using geographic information systems, patient commuting times were calculated in two models: one that takes into account road distance (distance model), and the other that takes into account both the road distance and facility capacity (capacity-distance model). Simulations of closures of rural and urban facilities were then conducted. The median commuting time among rural patients was more than twice as long as that among urban patients (15 versus 7 minutes, p<0.001). In the capacity-distance model 36.1% of patients commuted to the facilities which were different from the facilities in the distance model, creating a substantial gap of commuting time between the two models. In the simulation, when five rural public facilitiess were closed, Gini coefficient of commuting times among the patients increased by 16%, indicating a substantial worsening of equity, and the number of patients with commuting times longer than 90 minutes increased by 72 times. In contrast, closure of four urban public facilities with similar capacities did not affect these values. Closures of dialysis facilities in rural areas have a substantially larger impact on equity of commuting times among dialysis patients than closures of urban facilities. The accessibility simulations using the capacity-distance model will provide an analytic framework upon which rational resource distribution policies might be planned.
2012-01-01
Background Frequent and long-term commuting is a requirement for dialysis patients. Accessibility thus affects their quality of lives. In this paper, a new model for accessibility measurement is proposed in which both geographic distance and facility capacity are taken into account. Simulation of closure of rural facilities and that of capacity transfer between urban and rural facilities are conducted to evaluate the impacts of these phenomena on equity of accessibility among dialysis patients. Methods Post code information as of August 2011 of all the 7,374 patients certified by municipalities of Hiroshima prefecture as having first or third grade renal disability were collected. Information on post code and the maximum number of outpatients (capacity) of all the 98 dialysis facilities were also collected. Using geographic information systems, patient commuting times were calculated in two models: one that takes into account road distance (distance model), and the other that takes into account both the road distance and facility capacity (capacity-distance model). Simulations of closures of rural and urban facilities were then conducted. Results The median commuting time among rural patients was more than twice as long as that among urban patients (15 versus 7 minutes, p < 0.001). In the capacity-distance model 36.1% of patients commuted to the facilities which were different from the facilities in the distance model, creating a substantial gap of commuting time between the two models. In the simulation, when five rural public facilitiess were closed, Gini coefficient of commuting times among the patients increased by 16%, indicating a substantial worsening of equity, and the number of patients with commuting times longer than 90 minutes increased by 72 times. In contrast, closure of four urban public facilities with similar capacities did not affect these values. Conclusions Closures of dialysis facilities in rural areas have a substantially larger impact on equity of commuting times among dialysis patients than closures of urban facilities. The accessibility simulations using thecapacity-distance model will provide an analytic framework upon which rational resource distribution policies might be planned. PMID:22824294