Sample records for act operating permit

  1. 77 FR 58988 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... Act (Act) by WildEarth Guardians (Petitioner), to object to WDEQ's June 7, 2011 Permit (Permit) issued...Earth Petitioner dated August 4, 2011, requesting that EPA object to the issuance of the Permit to CLF&P...

  2. 76 FR 12730 - Clean Air Act Operating Permit Program; Objection to State Operating Permit for U.S. Steel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... ENVIRONMENTAL PROTECTION AGENCY [Regional Docket Nos. V-2009-1, FRL-9276-7] Clean Air Act Operating Permit Program; Objection to State Operating Permit for U.S. Steel-Granite City Works AGENCY... operating permit issued by the Illinois Environmental Protection Agency to the U.S. Steel--Granite City...

  3. 77 FR 59186 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-26

    ... ENVIRONMENTAL PROTECTION AGENCY [Petition IV-2011-1; FRL-9734-2] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Tennessee Valley Authority's Shawnee Fossil... Valley Authority for its Shawnee Fossil Plant (SFP) facility located in West Paducah, Kentucky. This...

  4. 75 FR 36069 - Clean Air Act Operating Permit Program; Petition for Objection to a Federal Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9167-5] Clean Air Act Operating Permit Program; Petition for Objection to a Federal Operating Permit for Waste Management of Louisiana L.L.C., Woodside Landfill and Recycling Center (WLRC), Walker, Livingston Parish, LA AGENCY: Environmental Protection Agency (EPA). ACTION...

  5. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY... McGillivray Westerberg and Bender, LLC, on behalf of the Sierra Club, to object to the operating permit for Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a...

  6. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-03

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper Company, Luke, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean Air Act (CAA), the...

  7. 77 FR 16509 - Proposed Approval of Revision of Five California Clean Air Act Title V Operating Permits Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Approval of Revision of Five California Clean Air Act Title V Operating Permits Programs AGENCY... the Operating Permits (Title V) programs of the Monterey Bay Unified Air Pollution Control District... been previously subject to Title V for other reasons to obtain a Title V permit. See ``Prevention of...

  8. 76 FR 10361 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... July 14, 2010 response of the CDPHE, Air Pollution Control Division to the October 8, 2009 Order by EPA... ENVIRONMENTAL PROTECTION AGENCY [FRL-9270-5] Clean Air Act Operating Permit Program; Petition for... issued by the Colorado Department of Public Health and Environment (CDPHE). Specifically, the...

  9. 76 FR 53452 - Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9457-3 ] Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit for Reliant Portland Generating Station, Upper Mount Bethel Township, Northampton County, PA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of action...

  10. 77 FR 76479 - Clean Air Act Operating Permit Program: Order Responding to Petition for Objection to State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9765-4] Clean Air Act Operating Permit Program: Order Responding to Petition for Objection to State Operating Permit for U.S. Steel-- Granite City Works, Granite... Protection Agency (IEPA) for the U.S. Steel--Granite City Works (USGW) facility, located in Granite City...

  11. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...

  12. 77 FR 54382 - Revisions of Five California Clean Air Act Title V Operating Permits Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-05

    ... Five California Clean Air Act Title V Operating Permits Programs AGENCY: Environmental Protection... Permits (Title V) programs of the Monterey Bay Unified Air Pollution Control District (MBUAPCD), San Luis... thresholds in EPA's Tailoring Rule, which have not been previously subject [[Page 54383

  13. 77 FR 37038 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for CF&I...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... title V of the Clean Air Act (Act) by WildEarth Guardians (Petitioner), to object to CDPHE's December 28.... EPA received a petition from WildEarth Guardians dated March 24, 2011, requesting that EPA object to...

  14. 77 FR 16836 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... operating permit (Permit Number P062R2) issued by the New Mexico Environment Department, Air Quality Bureau... Objection to State Operating Permit for Public Service Company of New Mexico, San Juan Generating Station... Mexico, for the operations of the San Juan Generating Station (SJGS) located in San Juan County, New...

  15. 75 FR 2140 - Clean Air Act Operating Permit Program; Petition for Objection to Federal Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... Objection to Federal Operating Permit for American Electric Power Service Corporation, Southwest Electric... object to the American Electric Power Service Corporation, Southwest Electric Power Company (AEP... Permits Section, Multimedia Planning and Permitting Division, EPA Region 6, 1445 Ross Avenue, Dallas...

  16. 40 CFR 49.9869 - Permits to operate.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9869 Permits to operate. Permits to operate...

  17. 76 FR 43684 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ..., submitted by WildEarth Guardians (Petitioner), to object to CDPHE's January 1, 2010, title V permit issued.... Any petition for review shall be filed within 60 days from the date this notice appears in the Federal...: [email protected] . SUPPLEMENTARY INFORMATION: The Act affords EPA a 45-day period to review and...

  18. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  19. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  20. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  1. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  2. 76 FR 74755 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... and Lime AGENCY: Environmental Protection Agency (EPA). ACTION: Denial of petition. SUMMARY: This... object to a Title V operating permit for Carmeuse Stone and Lime (Carmeuse) issued by the Wisconsin...

  3. 76 FR 12926 - Clean Air Act Proposed Interim Approval of Title V Operating Permits Program; Southern Ute Indian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... Proposed Interim Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY... Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating Permit Program (Title V Program) was submitted for the purpose of administering a tribal...

  4. Major Source Determinations for Military Installations under the Air Toxics, New Source Rewiew, and Title V Operating Permit Programs of the Clean Air Act (Act)

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  5. 75 FR 42084 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for JP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-20

    ... the Sierra Club asking EPA to object to a Title V operating permit for the Wisconsin Public Service... this period. On June 25, 2009, EPA received a petition from the Sierra Club requesting that EPA object...

  6. 77 FR 15267 - Clean Air Act Full Approval of Title V Operating Permits Program; Southern Ute Indian Tribe

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-15

    ... Full Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: The EPA is promulgating full approval of the Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating...

  7. 76 FR 36917 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... business; (II) The Title V permit failed to provide for the control of mercury emissions, an air... Reasonably Available Control Technology for the control of carbon dioxide emissions or for mercury emissions...

  8. 76 FR 28223 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-16

    ... Program; Petition for Objection to State Operating Permit for Tennessee Valley Authority--Paradise Fossil... for Air Quality to Tennessee Valley Authority (TVA) for its Paradise Fossil Fuel Plant located near... period. Petitioner submitted a petition regarding the Paradise Fossil Fuel Plant on January 9, 2010...

  9. 76 FR 10894 - Notice of Issuance of Prevention of Significant Deterioration and Federal Operating Permits to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... (EPA). ACTION: Notice. SUMMARY: This notice announces that, on December 30, 2010, pursuant to title V of the Clean Air Act, EPA issued a title V Permit to Operate (title V permit) to the Mille Lacs Band... permits, which ended April 5, 2010, EPA received comments on the draft title V permit, and revised the...

  10. 76 FR 52946 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ...This document announces that the EPA Administrator has responded to a citizen petition asking EPA to object to an operating permit (Permit Number P026R2) issued by the New Mexico Environment Department, Air Quality Bureau (NMED). Specifically, the Administrator has granted the April 14, 2010 petition, submitted by WildEarth Guardians and San Juan Citizens Alliance (Petitioners) to object to the March 19, 2010, operating permit issued to Williams Four Corners, LLC, for the Sims Mesa Central Delivery Point (CDP) compressor station in northwestern Rio Arriba County, New Mexico. Pursuant to sections 307(b) and 505(b)(2) of the Clean Air Act (CAA), a petition for judicial review of those parts of the Order that deny issues in the petition may be filed in the United States Court of Appeals for the appropriate circuit within 60 days from the date this notice appears in the Federal Register.

  11. 75 FR 19968 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Objection to State Operating Permit for Public Service Company of Colorado--Hayden Station AGENCY... of Colorado dba Xcel Energy (Xcel)--Hayden Power Station. Pursuant to section 505(b)(2) of the Clean.... Additionally, the final order for Public Service Company of Colorado--Hayden Power Station, is available...

  12. 78 FR 7428 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... the March 28, 2011 petition, submitted by the Louisiana Environmental Action Network (LEAN), Sierra..., 2011 to Noranda Alumina, LLC, for the operation of the alumina production plant located in Gramercy, St... production plant in Gramercy, St. James Parish, Louisiana for the following reasons: (1) The Title V Permit...

  13. 77 FR 42493 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Cash...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ... Program; Petition for Objection to State Operating Permit for Cash Creek Generation, LLC--Cash Creek... issued by the Kentucky Division for Air Quality (KDAQ) to Cash Creek Generation, LLC for its Cash Creek Generation Station (Cash Creek) located near Owensboro in Henderson County, Kentucky. This Order constitutes...

  14. 40 CFR 72.51 - Permit shield.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...

  15. 40 CFR 72.51 - Permit shield.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...

  16. 40 CFR 72.51 - Permit shield.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...

  17. 40 CFR 72.51 - Permit shield.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...

  18. 40 CFR 72.51 - Permit shield.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...

  19. RCRA, superfund and EPCRA hotline training module. Introduction to: Permits and interim status (40 cfr part 270) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    Owners/operators of facilities that treat, store, or dispose of hazardous waste must obtain an operating permit, as required by Subtitle C of the Resource Conservation and Recovery Act (RCRA). The module presents an overview of the RCRA permitting process and the requirements that apply to TSDFs operating under interim status until a permit is issued. The regulations governing the permit process are found in 40 CFR Parts 124 through 270.

  20. 78 FR 13055 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... Citizen, Texas Campaign for the Environment, Environment Texas, and the SEED Coalition (Petitioners), to... 505(b)(2) of the Act provide that a petitioner may ask for judicial review of those portions of the... for review shall be filed within 60 days from the date this notice appears in the Federal Register...

  1. 77 FR 7148 - Notice of Approval of Clean Air Act Outer Continental Shelf Permits Issued to Shell Gulf of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... Shelf Permits Issued to Shell Gulf of Mexico, Inc., and Shell Offshore, Inc. for the Discoverer... Clean Air Act Outer Continental Shelf (OCS) permit applications, one from Shell Gulf of Mexico, Inc., for operation of the Discoverer drillship in the Chukchi Sea and one from Shell Offshore, Inc...

  2. 76 FR 66286 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ...). Specifically, the Administrator has denied the April 1, 2010, Petition, submitted by WildEarth Guardians... within 60 days from the date this notice appears in the Federal Register, pursuant to section 307 of the... affords EPA a 45-day period to review and object to, as appropriate, a title V operating permit proposed...

  3. 76 FR 66285 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ...). Specifically, the Administrator has denied the March, 2010, Petition, submitted by WildEarth Guardians... within 60 days from the date this notice appears in the Federal Register, pursuant to section 307 of the... affords EPA a 45-day period to review and object to, as appropriate, a title V operating permit proposed...

  4. 77 FR 27054 - Notice of Approval of Clean Air Act Outer Continental Shelf Permits Issued to Shell Offshore, Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-08

    ... Shelf Permits Issued to Shell Offshore, Inc. for the Kulluk Conical Drilling Unit AGENCY: United States... (OCS) permit to construct and Title V air quality operating permit to Shell Offshore, Inc. (``Shell'') for operation of the Kulluk conical drilling unit in the Beaufort Sea off the north coast of Alaska...

  5. Options for Limiting the Potential to Emit (PTE) of a Stationary Source Under Section 112 and Title V of the Clean Air Act (Act)

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  6. 47 CFR 80.163 - Operator requirements of the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Operator requirements of the Bridge-to-Bridge... Requirements § 80.163 Operator requirements of the Bridge-to-Bridge Act. Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or...

  7. 47 CFR 80.163 - Operator requirements of the Bridge-to-Bridge Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operator requirements of the Bridge-to-Bridge... Requirements § 80.163 Operator requirements of the Bridge-to-Bridge Act. Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or...

  8. Avoiding Title V permitting pitfalls

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laswell, D.L.

    1993-04-01

    Title V of the 1990 Clean Air Act Amendments requires states to implement new air operating permit programs. States have a great deal of flexibility in developing their permit programs. Industry should work now to ensure that state programs contain the favorable aspects of the federal regulations and do not contain more stringent requirements that are not required under the Clean Air Act. This article outlines areas of the permit program that have the potential to handicap industry`s ability to expand.

  9. 40 CFR 124.10 - Public notice of permit actions and public comment period.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... issued or is required to issue a RCRA, UIC, PSD (or other permit under the Clean Air Act), NPDES, 404... which may affect aircraft operations or for purposes associated with seaplane operations; (vii) For PSD...

  10. 75 FR 145 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for East...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-04

    ....-- William C. Dale Power Station; Clark County, KY AGENCY: Environmental Protection Agency (EPA). ACTION... Station (Dale Station) located in Clark County, Kentucky. This Order constitutes a final action on the...

  11. 40 CFR 270.40 - Transfer of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40... Act. (b) Changes in the ownership or operational control of a facility may be made as a Class 1...

  12. 40 CFR 270.40 - Transfer of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40... Act. (b) Changes in the ownership or operational control of a facility may be made as a Class 1...

  13. Notice of Deficiency for 34 Clean Air Act Operating Permits Programs in California

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. 77 FR 24200 - Clean Air Act Operating Permit Program; Petitions for Objection to State Operating Permits for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... without requiring preconstruction monitoring for particulate matter less than 10 microns (PM 10 ), sulfur dioxide (SO 2 ), hydrogen sulfide (H 2 S), total reduced sulfur (TRS) and sulfuric acid mist; and (5) LDEQ... in the decision-making process. In the 2011 Petition for the modified title V pig iron permit and for...

  15. 30 CFR 947.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes... for an underground mining permit shall also indicate how compliance will be achieved with the Washington Water Pollution Control Act, RCW 90.48. ...

  16. 77 FR 36581 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received.... The presence of these animals pose operation safety concerns as well as potential harm to the animals... for capturing Antarctic fishes to study their physiology and biochemistry. Benthic Otter trawling is...

  17. 40 CFR 49.10049 - Permits to operate.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Permits to operate. 49.10049 Section 49.10049 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Cow...

  18. Guidance To States On Authority Necessary To Implement The Operating Permits Program In Title V Of The Clean Air Act Amendments of 1990

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  19. 77 FR 47380 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... permit. Major changes also include definition of ``operator'', acute toxicity test for produced water... Category as authorized by section 402 of the Clean Water Act, (CWA). This permit renewal authorizes... considered all comments received and makes few changes to the proposed permit: pH limit for formation test...

  20. Use Of Clean Air Act Title V Permit Fees As Match For Section 105 Grants

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  1. Procedures for EPA to Address Deficient New Source Permits Under the Clean Air Act

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  2. 77 FR 4288 - Arbitration Panel Decision Under the Randolph-Sheppard Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-27

    ... February 5, 2009, permit application to operate vending machines at the Southern Oregon Rehabilitation... Blind for a permit to operate the Clinic vending machines.'' Arbitration Panel Decision After reviewing... vending machines are part and parcel of that facility. The panel noted that the parties' differing...

  3. 12 CFR 348.4 - Interlocking relationships permitted by statute.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... authorized on an emergency basis in accordance with section 13(k) of the Federal Deposit Insurance Act (12 U... 12 Banks and Banking 5 2014-01-01 2014-01-01 false Interlocking relationships permitted by statute... function; (b) A corporation operating under section 25 or section 25A of the Federal Reserve Act (12 U.S.C...

  4. 12 CFR 348.4 - Interlocking relationships permitted by statute.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... authorized on an emergency basis in accordance with section 13(k) of the Federal Deposit Insurance Act (12 U... 12 Banks and Banking 5 2013-01-01 2013-01-01 false Interlocking relationships permitted by statute... function; (b) A corporation operating under section 25 or section 25A of the Federal Reserve Act (12 U.S.C...

  5. 12 CFR 348.4 - Interlocking relationships permitted by statute.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... authorized on an emergency basis in accordance with section 13(k) of the Federal Deposit Insurance Act (12 U... 12 Banks and Banking 5 2012-01-01 2012-01-01 false Interlocking relationships permitted by statute... function; (b) A corporation operating under section 25 or section 25A of the Federal Reserve Act (12 U.S.C...

  6. 12 CFR 348.4 - Interlocking relationships permitted by statute.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... authorized on an emergency basis in accordance with section 13(k) of the Federal Deposit Insurance Act (12 U... 12 Banks and Banking 4 2011-01-01 2011-01-01 false Interlocking relationships permitted by statute... function; (b) A corporation operating under section 25 or section 25A of the Federal Reserve Act (12 U.S.C...

  7. 76 FR 48182 - Notice of Permit Application Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    .... Designated pollutants would be associated with camp operations [typically air emissions and waste water... (NSF) has received a waste management permit application for operation of a field research camp located...: NSF's Antarctic Waste Regulation, 45 CFR part 671, requires all U.S. citizens and entities to obtain a...

  8. 30 CFR 761.17 - Regulatory authority obligations at time of permit application review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... permit application review. 761.17 Section 761.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR AREAS UNSUITABLE FOR MINING AREAS DESIGNATED BY ACT OF... of an administratively complete application for a permit for a surface coal mining operation, or an...

  9. Waste Isolation Pilot Plant (WIPP) fact sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-10-01

    Pursuant to the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA), as amended (42 USC 6901, et seq.), and the New Mexico Hazardous Waste Act (Section 74-4-1 et seq., NMSA 1978), Permit is issued to the owner and operator of the US DOE, WIPP site (hereafter called the Permittee(s)) to operate a hazardous waste storage facility consisting of a container storage unit (Waste Handling Building) and two Subpart X miscellaneous below-ground storage units (Bin Scale Test Rooms 1 and 3), all are located at the above location. The Permittee must comply with all termsmore » and conditions of this Permit. This Permit consists of the conditions contained herein, including the attachments. Applicable regulations cited are the New Mexico Hazardous Waste Management Regulations, as amended 1992 (HWMR-7), the regulations that are in effect on the date of permit issuance. This Permit shall become effective upon issuance by the Secretary of the New Mexico Environment Department and shall be in effect for a period of ten (10) years from issuance. This Permit is also based on the assumption that all information contained in the Permit application and the administrative record is accurate and that the activity will be conducted as specified in the application and the administrative record. The Permit application consists of Revision 3, as well as associated attachments and clarifying information submitted on January 25, 1993, and May 17, 1993.« less

  10. Next Steps and Preliminary Views on the Application of Clean Air Act Permitting Programs to Greenhouse Gases Following the Supreme Court's Decision in Utility Air Regulatory Group v. Environmental Protection Agency

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. Hanford facility dangerous waste permit application, general information portion. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).« less

  12. Issuance of the Clean Air Act Stationary Source Compliance Monitoring Strategy

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. Responce to Memo Reguarding Clean Air Act Title III

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. Guidelines for Implementation of Section 507 of the 1990 Clean Air Act Amendments

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  15. Reduced Penalties for Disclosures of Certain Clean Air Act Violations

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  16. 50 CFR 13.11 - Application procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Rescue Center Program 50 CFR 23 (1) (1) CITES Registration of Commercial Breeding Operations for Appendix..., POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND PLANTS... Conservation Act permits (50 CFR 15); injurious wildlife permits (50 CFR 16); captive-bred wildlife...

  17. 50 CFR 13.11 - Application procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Rescue Center Program 50 CFR 23 (1) (1) CITES Registration of Commercial Breeding Operations for Appendix..., POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND PLANTS... Conservation Act permits (50 CFR 15); injurious wildlife permits (50 CFR 16); captive-bred wildlife...

  18. 50 CFR 13.11 - Application procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Rescue Center Program 50 CFR 23 (1) (1) CITES Registration of Commercial Breeding Operations for Appendix..., POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND PLANTS... Conservation Act permits (50 CFR 15); injurious wildlife permits (50 CFR 16); captive-bred wildlife...

  19. 50 CFR 13.11 - Application procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Rescue Center Program 50 CFR 23 (1) (1) CITES Registration of Commercial Breeding Operations for Appendix..., POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND PLANTS... Conservation Act permits (50 CFR 15); injurious wildlife permits (50 CFR 16); captive-bred wildlife...

  20. The Clean Air Act: A time to assess impacts and management options

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goldberg, T.; Repa, E.

    The Clean Air Act Amendments of 1990 significantly altered the complexion of air emission regulation and for the first time established requirements for comprehensive emission control strategies. None of the provisions of this act will have as great an impact on the waste management industry as will the General Operating Permit Provisions of Title V. Title V establishes a program for issuing operating permits to all major sources (and certain other sources) of air pollutants in the U.S. These permits will collect in one place all applicable requirements, limitations, and conditions governing regulated air emissions. While past air regulations governedmore » specific air emissions sources, as of November 1993 the law requires states and localities to regulate emissions from all major stationary sources that directly emit, or have the potential to emit, 100 tons or more of any pollutant, 10 tons or more of a single hazardous air pollutant, or 25 tons or more of two or more hazardous air pollutants.« less

  1. 75 FR 35447 - Buy American Exception Under the American Recovery and Reinvestment Act of 2009; Nationwide...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... Reinvestment and Recovery Act of 2009 (Recovery Act) to EERE-funded projects for non-residential programmable...[hyphen]residential programmable thermostats; commercial scale fully-automatic wood pellet boiler systems...) Programmable Thermostats--Includes devices that permit adjustment of heating or air-conditioning operations...

  2. 77 FR 50504 - Clean Air Act Operating Permit Program; Action on Petition for Objection to State Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ...) requirements because WDNR erroneously exempted as ``routine maintenance, repair, and replacement'' projects... were triggered through non-exempt fuel switching and WDNR improperly deferred addressing this issue...

  3. Final Report to the Clean Air Act Advisory Committee, Title V Implementation Experience

    EPA Pesticide Factsheets

    In 2004, the Clean Air Act Advisory Committee established the Task Force on Title V Implementation Experience to report on stakeholder experience with implementation of the Title V operating permit program. This report details their recommendations.

  4. 77 FR 55194 - Endangered Species; File No. 17095

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    .... The requested permit has been issued under the authority of the Endangered Species Act of 1973, as... of endangered and threatened species (50 CFR parts 222-226). The Permit Holder is issued a five-year... operate to the disadvantage of such endangered or threatened species, and (3) is consistent with the...

  5. Managing storm water at airports

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Halm, M.J.

    1996-09-01

    Airports are active facilities with numerous on-going operations at their sites. The following operations may adversely affect the water quality of nearby aquatic environments: De-icing runways; de-icing taxiways; de-icing and anti-icing aircraft; aircraft maintenance; and salt de-icer application. Until the amendments to the Clean Water Act of 1972, referred to as the Water Quality Act of 1987, were passed by Congress, the majority of storm water discharges in the US were unregulated. The Water Quality Act of 1987 was promulgated as an effort to manage the pollution resulting from storm water runoff. Many industrial facilities, especially airports, were faced withmore » complex problems in attempting to comply with these new federal regulations. National Pollution Discharge Elimination System (NPDES) permits for airports with more than 50,000 flight operations per year require periodic monitoring of receiving waters and storm sewer outfalls. The federal government has given states jurisdiction in issuing NPDES permits for storm water discharges. States may require composite or grab samples.« less

  6. 25 CFR 700.819 - Suspension and revocation of permits.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ....819 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION... cause. (1) The Federal Land Manager may suspend a permit issued pursuant to this part upon determining... prohibition of the Act or § 700.807. The Federal Land Manager shall provide written notice to the permittee of...

  7. 25 CFR 700.819 - Suspension and revocation of permits.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ....819 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION... cause. (1) The Federal Land Manager may suspend a permit issued pursuant to this part upon determining... prohibition of the Act or § 700.807. The Federal Land Manager shall provide written notice to the permittee of...

  8. 25 CFR 700.819 - Suspension and revocation of permits.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ....819 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION... cause. (1) The Federal Land Manager may suspend a permit issued pursuant to this part upon determining... prohibition of the Act or § 700.807. The Federal Land Manager shall provide written notice to the permittee of...

  9. 25 CFR 700.819 - Suspension and revocation of permits.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ....819 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION... cause. (1) The Federal Land Manager may suspend a permit issued pursuant to this part upon determining... prohibition of the Act or § 700.807. The Federal Land Manager shall provide written notice to the permittee of...

  10. 50 CFR 216.24 - Taking and related acts incidental to commercial fishing operations by tuna purse seine vessels...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... distance from the backdown channel apex to the stern tiedown point. (7) Experimental fishing operations. The Administrator, Southwest Region, may authorize experimental fishing operations, consistent with.... (i) A vessel permit holder may apply for an experimental fishing operation waiver by submitting the...

  11. 50 CFR 216.24 - Taking and related acts incidental to commercial fishing operations by tuna purse seine vessels...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... distance from the backdown channel apex to the stern tiedown point. (7) Experimental fishing operations. The Administrator, Southwest Region, may authorize experimental fishing operations, consistent with.... (i) A vessel permit holder may apply for an experimental fishing operation waiver by submitting the...

  12. 50 CFR 216.24 - Taking and related acts incidental to commercial fishing operations by tuna purse seine vessels...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... distance from the backdown channel apex to the stern tiedown point. (7) Experimental fishing operations. The Administrator, Southwest Region, may authorize experimental fishing operations, consistent with.... (i) A vessel permit holder may apply for an experimental fishing operation waiver by submitting the...

  13. 50 CFR 216.24 - Taking and related acts incidental to commercial fishing operations by tuna purse seine vessels...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... distance from the backdown channel apex to the stern tiedown point. (7) Experimental fishing operations. The Administrator, Southwest Region, may authorize experimental fishing operations, consistent with.... (i) A vessel permit holder may apply for an experimental fishing operation waiver by submitting the...

  14. 50 CFR 216.24 - Taking and related acts incidental to commercial fishing operations by tuna purse seine vessels...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... distance from the backdown channel apex to the stern tiedown point. (7) Experimental fishing operations. The Administrator, Southwest Region, may authorize experimental fishing operations, consistent with.... (i) A vessel permit holder may apply for an experimental fishing operation waiver by submitting the...

  15. ACTS of Education

    NASA Technical Reports Server (NTRS)

    Bauer, Robert; Krawczyk, Richard; Gargione, Frank; Kruse, Hans; Vrotsos, Pete (Technical Monitor)

    2002-01-01

    Now in its ninth year of operations, the Advanced Communications Technology Satellite (ACTS) program has continued, although since May 2000 in a new operations arrangement involving a university based consortium, the Ohio Consortium for Advanced Communications Technology (OCACT), While NASA has concluded its experimental intentions of ACTS, the spacecraft's ongoing viability has permitted its further operations to provide educational opportunities to engineering and communications students interested in satellite operations, as well as a Ka-band test bed for commercial interests in utilizing Kaband space communications. The consortium has reached its first year of operations. This generous opportunity by NASA has already resulted in unique educational opportunities for students in obtaining "hands-on" experience, such as, in satellite attitude control. An update is presented on the spacecraft and consortium operations.

  16. Understanding the impact of the Smoke-Free Ontario Act on hospitality establishments' outdoor environments: a survey of restaurants and bars.

    PubMed

    Kennedy, Ryan David; Elton-Marshall, Tara; Mutti, Seema; Dubray, Jolene; Fong, Geoffrey T

    2010-04-01

    The Smoke-Free Ontario Act (SFOA) came into effect in May 2006 and included restrictions to outdoor hospitality areas by only permitting smoking on a patio if the area had no roof. (1) To assess the impact of the SFOA on the prevalence of smoke-free patios in Ontario and (2) to determine the proportion of venues where structural alterations were made rather than going smoke-free in order to achieve compliance with the SFOA. A telephone survey of 403 hospitality sector operators/owners in four clustered samples of Ontario, Canada. Based on completed surveys, the SFOA resulted in an increase in prevalence of smoke-free patios, from 5% (n=21) to 25% (n=99). Of the patios where smoking was permitted before the SFOA (n=382), 42% (n=161) had physical structures that would make smoking not permissible under the new act. Operators of half of these venues (n=80) made their patios smoke-free, with most indicating they had no choice given the costs or physical limitations to changing their outdoor environment. The other half (n=81) reported making physical changes, including removing roof structures to achieve compliance. The SFOA resulted in greater protection from outdoor secondhand smoke; however, most patios still permitted smoking. Half of the venues that complied with the SFOA by going smoke-free did so involuntarily because of structural and/or financial limitations. The majority of venue operators preferred to permit smoking on their patios, and only made their patios smoke-free when they were required to do so by law.

  17. 77 FR 42488 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Panoche Valley Solar...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ... Water Act to construct and operate a 399-Megawatt AC (MWAC) solar photovoltaic (PV) energy generating... Environmental Impact Statement for the Proposed Panoche Valley Solar Farm in San Benito County, CA, Corps Permit... Department of the Army permit application to construct a solar photovoltaic energy plant in San Benito County...

  18. 77 FR 34064 - Notice of Lodging of the Consent Decree under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... Permit; (3) Arecibo violates its Small MS4 General Permit by discharging sewage and sewage sludge not...; and failing to properly operate and maintain its system; and (4) discharges untreated sewage from its... public has or may have come into contact with the sewage. The proposed Consent Decree addresses the...

  19. 76 FR 43237 - Patient Protection and Affordable Care Act; Establishment of Consumer Operated and Oriented Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... General OMB Office of Management and Budget PHS Act Public Health Service Act QHP Qualified Health Plan...) performs some of the issuer's management functions under contract or delegation. Thus, CMS would permit a... billing, and case management from a health insurance issuer that existed on July 16, 2009, as long as the...

  20. The effect of motorcycle travel on the safety and operations of HOV facilities in Virginia.

    DOT National Transportation Integrated Search

    1995-01-01

    The Intermodal Surface Transportation Efficiency Act of 1991 mandated that motorcycles be permitted to travel on federally funded high-occupancy vehicle (HOV) facilities unless they created a safety hazard or adversely affected HOV operations. Althou...

  1. 49 CFR 231.22 - Operation of track motor cars.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Operation of track motor cars. 231.22 Section 231... motor cars. On and after August 1, 1963, it shall be unlawful for any railroad subject to the requirements of the Safety Appliance Acts to operate or permit to be operated on its line track motor cars to...

  2. 49 CFR 231.22 - Operation of track motor cars.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Operation of track motor cars. 231.22 Section 231... motor cars. On and after August 1, 1963, it shall be unlawful for any railroad subject to the requirements of the Safety Appliance Acts to operate or permit to be operated on its line track motor cars to...

  3. 49 CFR 231.22 - Operation of track motor cars.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Operation of track motor cars. 231.22 Section 231... motor cars. On and after August 1, 1963, it shall be unlawful for any railroad subject to the requirements of the Safety Appliance Acts to operate or permit to be operated on its line track motor cars to...

  4. 49 CFR 231.22 - Operation of track motor cars.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Operation of track motor cars. 231.22 Section 231... motor cars. On and after August 1, 1963, it shall be unlawful for any railroad subject to the requirements of the Safety Appliance Acts to operate or permit to be operated on its line track motor cars to...

  5. 49 CFR 231.22 - Operation of track motor cars.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Operation of track motor cars. 231.22 Section 231... motor cars. On and after August 1, 1963, it shall be unlawful for any railroad subject to the requirements of the Safety Appliance Acts to operate or permit to be operated on its line track motor cars to...

  6. 75 FR 48954 - Arbitration Panel Decision Under the Randolph-Sheppard Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... and its implementing regulations concerning the food services at Wright-Patterson Air Force Base in... permit to operate snack and beverage vending machines throughout the Wright-Patterson Air Force Base, and... income from the vending machines at the Wright-Patterson Air Force Base pursuant to the Act and...

  7. FAA's Implementation of the Commercial Space Launch Amendments Act of 2004- The Experimental Permit

    NASA Astrophysics Data System (ADS)

    Repcheck, J. Randall

    2005-12-01

    A number of entrepreneurs are committed to the goal of developing and operating reusable launch vehicles for private human space travel. In order to promote this emerging industry, and to create a clear legal, regulatory, and safety regime, the United States (U.S.) Congress passed the Commercial Space Launch Amendments Act of 2004 (CSLAA). Signed on December 23, 2004 by U.S. President George W. Bush, the CSLAA makes the Federal Aviation Administration (FAA) responsible for regulating human spaceflight. The CSLAA, among other things, establishes an experimental permit regime for developmental reusable suborbital rockets. This paper describes the FAA's approach in developing guidelines for obtaining and maintaining an experimental permit, and describes the core safety elements of those guidelines.

  8. Migration Amendment Act 1987 (No. 133 of 1987), 16 December 1987.

    PubMed

    1988-01-01

    This Act does the following, among other things: 1) requires that certain requests relating to entry permits, visas, and return endorsements are not considered to have been made unless in writing in accordance with the relevant approved forms and unless any fee payable has been made; 2) makes "operators," as well as charterers, liable for the carriage of persons to Australia without documentation; and 3) provides that international air operators shall pay immigration clearance fees payable by passengers whether or not the operator has collected the fees from the passengers. full text

  9. Major Source Determinations for Military Installations under the Air Toxics, New Source Review, and Title V Operating Permit Programs of the Clean Air Act (Act)

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. 40 CFR 122.36 - As an operator of a regulated small MS4, what happens if I don't comply with the application or...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM... and penalties described in Clean Water Act sections 309 (b), (c), and (g) and 505, or under applicable State, Tribal, or local law. Compliance with a permit issued pursuant to section 402 of the Clean Water...

  11. 40 CFR 122.36 - As an operator of a regulated small MS4, what happens if I don't comply with the application or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM... and penalties described in Clean Water Act sections 309 (b), (c), and (g) and 505, or under applicable State, Tribal, or local law. Compliance with a permit issued pursuant to section 402 of the Clean Water...

  12. Inspection of KCBX Terminals Company, Chicago, Illinois – May 10, 2012

    EPA Pesticide Factsheets

    EPA inspected the petroleum coke (petcoke) facility to investigate a coal dust complaint, and evaluate for compliance with the facility's Federally Enforceable State Operating Permit (FESOP) and the Clean Air Act.

  13. 75 FR 79352 - Arbitration Panel Decision Under the Randolph-Sheppard Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... manage vending machines at the Chemeketa Community College in addition to those he was already operating... 2005, while operating his vending location at the Lottery Building, Complainant learned from another... permitting it to be combined with the proposed espresso cart, in return for a vending machine location at the...

  14. 33 CFR 142.4 - Duties of lessees, permittees, and persons responsible for actual operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES WORKPLACE... operations. (a) Each holder of a lease or permit under the Act shall ensure that all places of employment... with workplace safety and health regulations of this part and, in addition, free from recognized...

  15. Region 9 NPDES Facilities - Waste Water Treatment Plants

    EPA Pesticide Factsheets

    Point geospatial dataset representing locations of NPDES Waste Water Treatment Plant Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates direct discharges from facilities that discharge treated waste water into waters of the US. Facilities are issued NPDES permits regulating their discharge as required by the Clean Water Act. A facility may have one or more outfalls (dischargers). The location represents the facility or operating plant.

  16. 76 FR 43346 - Notice of Lodging of Consent Decree Under the Clean Air Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... production limits and restrictions while seeking permits to install and operate additional equipment to... pre-1988 wood stoves with cleaner burning parts and/or stoves. The Department of Justice will receive...

  17. New EPA Guidelines for Review of Surface Coal Mining Operations in Appalachia (released in AEO2010)

    EIA Publications

    2010-01-01

    On April 1, 2010, the Environmental Protection Agency (EPA) issued a set of new guidelines to several of its Regional offices regarding the compliance of surface coal mining operations in Appalachia with the provisions of the Clean Water Act (CWA), the National Environmental Policy Act, and the environmental justice Executive Order (E.O. 12898). The stated purpose of the guidance was to explain more fully the approach that the EPA will be following in permit reviews, and to provide additional assurance that its Regional offices use clear, consistent, and science-based standards in reviewing the permits. Although the new guidelines go into effect immediately, they will be subjected to review both by the public and by the EPA's Science Advisory Board, with a set of final guidelines to be issued no later than April 1, 2011.

  18. Region 9 NPDES Facilities 2012- Waste Water Treatment Plants

    EPA Pesticide Factsheets

    Point geospatial dataset representing locations of NPDES Waste Water Treatment Plant Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates direct discharges from facilities that discharge treated waste water into waters of the US. Facilities are issued NPDES permits regulating their discharge as required by the Clean Water Act. A facility may have one or more outfalls (dischargers). The location represents the facility or operating plant.

  19. Consolidated Quarterly Report: Number of potential release sites subject to corrective action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, John R.

    2017-04-01

    This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent. The 12 sites in the corrective action process are listed in Table I-1.

  20. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Mike

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistentmore » with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.« less

  1. Electric turbocompound control system

    DOEpatents

    Algrain, Marcelo C [Dunlap, IL

    2007-02-13

    Turbocompound systems can be used to affect engine operation using the energy in exhaust gas that is driving the available turbocharger. A first electrical device acts as a generator in response to turbocharger rotation. A second electrical device acts as a motor to put mechanical power into the engine, typically at the crankshaft. Apparatus, systems, steps, and methods are described to control the generator and motor operations to control the amount of power being recovered. This can control engine operation closer to desirable parameters for given engine-related operating conditions compared to actual. The electrical devices can also operate in "reverse," going between motor and generator functions. This permits the electrical device associated with the crankshaft to drive the electrical device associated with the turbocharger as a motor, overcoming deficient engine operating conditions such as associated with turbocharger lag.

  2. Impacts of EPA 2012 commercial pump-out regulations.

    DOT National Transportation Integrated Search

    2012-08-01

    The US EPA issued the Vessel General Permit (VGP) for managing vessel discharges, under the Clean Water : Act. As a result, commercial vessels operating in the New York/New Jersey Harbor and at Delaware River will : be required to comply, including a...

  3. 18 CFR 153.16 - Contents of application.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... 153.16 Section 153.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR AUTHORIZATION TO CONSTRUCT, OPERATE... proposing to amend the article(s) of an existing Presidential Permit (other than facilities aspects) must...

  4. 18 CFR 153.16 - Contents of application.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... 153.16 Section 153.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR AUTHORIZATION TO CONSTRUCT, OPERATE... proposing to amend the article(s) of an existing Presidential Permit (other than facilities aspects) must...

  5. Clean Air Act Permitting in Nevada

    EPA Pesticide Factsheets

    Information on Clean Air Act permitting in Nevada in Nevada and EPA's oversight. Clean Air Act permitting in Nevada is the shared responsibility of one state and two local agencies, along with EPA Region 9.

  6. 78 FR 52804 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-26

    ... escort is cognizant of--and will follow the requirements contained in--the ASPA management plans and the...'' documentary procedures with regard to the natural environment as well as to adhere to all USAP operations and...

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holzemer, Michael J.; Hart, Edward

    Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication for the Idaho National Laboratory Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Partial Permit, PER-116. This Permit Reapplication is required by the PER-116 Permit Conditions I.G. and I.H., and must be submitted to the Idaho Department of Environmental Quality in accordance with IDAPA 58.01.05.012 [40 CFR §§ 270.10 and 270.13 through 270.29].

  8. 75 FR 52965 - Endangered and Threatened Species Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ...The following applicants have applied for scientific research permits to conduct certain activities with endangered species under the Endangered Species Act of 1973, as amended (Act). The Act requires that we invite public comment on these permit applications.

  9. 21 CFR 1210.28 - Permits waiving clause 4, section 2 of the Federal Import Milk Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Import Milk Act. 1210.28 Section 1210.28 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG ADMINISTRATION REGULATIONS UNDER THE FEDERAL IMPORT MILK ACT Permit Control § 1210.28 Permits...

  10. 21 CFR 1210.28 - Permits waiving clause 4, section 2 of the Federal Import Milk Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Import Milk Act. 1210.28 Section 1210.28 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG ADMINISTRATION REGULATIONS UNDER THE FEDERAL IMPORT MILK ACT Permit Control § 1210.28 Permits...

  11. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  12. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  13. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  14. 50 CFR 404.5 - Requirements for a vessel monitoring system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Requirement for use. Effective August 28, 2006, an owner or operator of a vessel that has been issued a permit... Magnuson-Stevens Fishery Conservation and Management Act, the Secretaries may have access to, and use of, collected data for scientific, statistical, and management purposes. (f) Authority for installation and...

  15. 50 CFR 404.5 - Requirements for a vessel monitoring system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Requirement for use. Effective August 28, 2006, an owner or operator of a vessel that has been issued a permit... Magnuson-Stevens Fishery Conservation and Management Act, the Secretaries may have access to, and use of, collected data for scientific, statistical, and management purposes. (f) Authority for installation and...

  16. 41 CFR 102-74.65 - Are cafeterias authorized under the Randolph-Sheppard Act operated by permit or contract?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession Services § 102-74... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are cafeterias...

  17. 24 CFR 970.3 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... subject to annual contributions contracts (ACCs) under the Act. (b) This part does not apply to the... dwelling units under ACC); (3) The conveyance of public housing for the purpose of providing homeownership... incidental to the normal operation of the project for public housing purposes, as permitted by the ACC; (5...

  18. 24 CFR 970.3 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... subject to annual contributions contracts (ACCs) under the Act. (b) This part does not apply to the... dwelling units under ACC); (3) The conveyance of public housing for the purpose of providing homeownership... incidental to the normal operation of the project for public housing purposes, as permitted by the ACC; (5...

  19. 43 CFR 23.4 - Application for permission to conduct exploration operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Application for permission to conduct... SURFACE EXPLORATION, MINING AND RECLAMATION OF LANDS § 23.4 Application for permission to conduct... disposition under the mineral leasing acts without first filing an application for, and obtaining, a permit...

  20. 40 CFR 745.85 - Work practice standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL ACT LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Residential Property...-flame burning or torching of lead-based paint is prohibited. (ii) The use of machines that remove lead...) Operating a heat gun on lead-based paint is permitted only at temperatures below 1100 degrees Fahrenheit. (4...

  1. Issuance of a final RCRA Part B Subpart X permit for open burning/open detonation (OB/OD) of explosives at Eglin AFB, Florida

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, G.E.; Culp, J.C.; Jenness, S.R.

    1997-12-31

    Treatment and disposal of explosives and munitions items have represented a significant management challenge for Department of Defense (DOD) facilities, particularly in light of increased regulatory scrutiny under the Federal Facilities Compliance Act provisions of the Resource Conservation and Recovery Act (RCRA). Subpart X of the RCRA regulations for storage, treatment, and disposal of hazardous wastes was drafted specifically to address explosive wastes. Until just recently, any DOD facility that was performing open burning/open detonation (OB/OD) of explosives was doing so under interim status for RCRA Part B Subpart X. In August 1996, Eglin Air Force Base (AFB), Florida becamemore » the first Air Force facility to be issued a final Part B Subpart X permit to perform OB/OD operations at two Eglin AFB active test ranges. This presentation will examine how Eglin AFB worked proactively with the State of Florida Department of Environmental Protection (FDEP) and EPA Region IV to develop permit conditions based upon risk assessment considerations for both air and ground-water exposure pathways. It will review the role of air emissions and air dispersion modeling in assessing potential exposure and impacts to both onsite and offsite receptors, and will discuss how air monitoring will be used to assure that the facility remains in compliance during OB/OD activities. The presentation will also discuss the soil and ground-water characterization program and associated risk assessment provisions for quarterly ground-water monitoring to assure permit compliance. The project is an excellent example of how a collaborative working relationship among the permittee, their consultant and state, and EPA can result in an environmentally protective permit that assures operational flexibility and mission sensitivity.« less

  2. 75 FR 69699 - Endangered Species Recovery Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  3. 77 FR 12611 - Endangered Species Recovery Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  4. 75 FR 53708 - Endangered Species Recovery Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  5. S. 1626: This Act may be cited as the Mickey Leland Minority Economic Impact Revitalization Act. Introduced in the Senate of the United States, One Hundredth First Congress, First Session, September 14, 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    S. 1626 is a bill to establish within the Office of Minority Economic Impact of the Department of Energy (DOE) programs involving loans and grants to enhance the development and operation of minority business enterprises with respect to energy-related business, to amend the Nuclear Waste Policy Act of 1982 to permit the investment of certain funds in the Minority Bank Deposit Program of the Department of the Treasury, and for other purposes.

  6. 78 FR 54686 - Notice of Permit Applications Received under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received under the Antarctic Conservation Act of 1978. SUMMARY: The National Science Foundation (NSF) is required...

  7. 77 FR 60477 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit applications received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National Science...

  8. 78 FR 60321 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National Science...

  9. 77 FR 23766 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National Science...

  10. 40 CFR 22.44 - Supplemental rules of practice governing the termination of permits under section 402(a) of the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... governing the termination of permits under section 402(a) of the Clean Water Act or under section 3008(a)(3... Supplemental rules of practice governing the termination of permits under section 402(a) of the Clean Water Act... permits under section 402(a) of the Clean Water Act or under section 3008(a)(3) of the Resource...

  11. 40 CFR 22.44 - Supplemental rules of practice governing the termination of permits under section 402(a) of the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... governing the termination of permits under section 402(a) of the Clean Water Act or under section 3008(a)(3... Supplemental rules of practice governing the termination of permits under section 402(a) of the Clean Water Act... permits under section 402(a) of the Clean Water Act or under section 3008(a)(3) of the Resource...

  12. 40 CFR 22.44 - Supplemental rules of practice governing the termination of permits under section 402(a) of the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... governing the termination of permits under section 402(a) of the Clean Water Act or under section 3008(a)(3... Supplemental rules of practice governing the termination of permits under section 402(a) of the Clean Water Act... permits under section 402(a) of the Clean Water Act or under section 3008(a)(3) of the Resource...

  13. 40 CFR 22.44 - Supplemental rules of practice governing the termination of permits under section 402(a) of the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... governing the termination of permits under section 402(a) of the Clean Water Act or under section 3008(a)(3... Supplemental rules of practice governing the termination of permits under section 402(a) of the Clean Water Act... permits under section 402(a) of the Clean Water Act or under section 3008(a)(3) of the Resource...

  14. 77 FR 64831 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... NATIONAL SCIENCE FOUNDATION Notice of Permits Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permits issued under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF) is required to publish...

  15. 77 FR 64831 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... NATIONAL SCIENCE FOUNDATION Notice of Permits Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of a permit modification issued under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF) is required to...

  16. 76 FR 47611 - Notice of Permit Modification Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Modification Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit modification issued under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National Science Foundation...

  17. 40 CFR 25.9 - Permit enforcement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Permit enforcement. 25.9 Section 25.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL PUBLIC PARTICIPATION IN PROGRAMS UNDER THE RESOURCE CONSERVATION AND RECOVERY ACT, THE SAFE DRINKING WATER ACT, AND THE CLEAN WATER ACT § 25.9 Permit...

  18. 40 CFR 25.9 - Permit enforcement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Permit enforcement. 25.9 Section 25.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL PUBLIC PARTICIPATION IN PROGRAMS UNDER THE RESOURCE CONSERVATION AND RECOVERY ACT, THE SAFE DRINKING WATER ACT, AND THE CLEAN WATER ACT § 25.9 Permit...

  19. 76 FR 79612 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... state-operated permit banks for the purpose of maximizing the fishing opportunities made available by... activity to regain their DAS for that trip, providing another opportunity to profit from the DAS that would... entities. Further, no reductions in profit are expected for any small entities, so the profitability...

  20. 75 FR 78227 - Endangered Species; File No. 14400

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... permit has been issued under the authority of the Endangered Species Act of 1973, as amended (ESA; 16 U.S... black abalone, a species listed as endangered on February 13, 2009. The objective of this monitoring is...) will not operate to the disadvantage of such endangered or threatened species, and (3) is consistent...

  1. 78 FR 38952 - Endangered Species; File No. 17506

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... requested permit has been issued under the authority of the Endangered Species Act of 1973, as amended (ESA... endangered and threatened species (50 CFR parts 222-226). Ms. Holloway-Adkins has been issued a 5-year... not operate to the disadvantage of such endangered or threatened species, and (3) is consistent with...

  2. 75 FR 26715 - Endangered Species; File No. 10022

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... Endangered Species Act of 1973, as amended (ESA; 16 U.S.C. 1531 et seq.) and the regulations governing the taking, importing, and exporting of endangered and threatened species (50 CFR parts 222-226). Permit No... for in good faith, (2) will not operate to the disadvantage of such endangered or threatened species...

  3. 41 CFR 102-74.55 - Are vending facilities authorized under the Randolph-Sheppard Act operated by permit or contract?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are vending facilities... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession Services § 102-74...

  4. 18 CFR 4.31 - Initial or competing application: who may file.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Preliminary Permit, License or Exemption... or a license for a water power project under Part I of the Federal Power Act. (b) Application for... property interests in the lands necessary to develop and operate that project, or an option to obtain those...

  5. 18 CFR 4.31 - Initial or competing application: who may file.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Preliminary Permit, License or Exemption... or a license for a water power project under Part I of the Federal Power Act. (b) Application for... property interests in the lands necessary to develop and operate that project, or an option to obtain those...

  6. 18 CFR 4.31 - Initial or competing application: who may file.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Preliminary Permit, License or Exemption... or a license for a water power project under Part I of the Federal Power Act. (b) Application for... property interests in the lands necessary to develop and operate that project, or an option to obtain those...

  7. 18 CFR 4.31 - Initial or competing application: who may file.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Preliminary Permit, License or Exemption... or a license for a water power project under Part I of the Federal Power Act. (b) Application for... property interests in the lands necessary to develop and operate that project, or an option to obtain those...

  8. 18 CFR 4.31 - Initial or competing application: who may file.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Preliminary Permit, License or Exemption... or a license for a water power project under Part I of the Federal Power Act. (b) Application for... property interests in the lands necessary to develop and operate that project, or an option to obtain those...

  9. 75 FR 73065 - Tennessee Gas Pipeline Company; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    .... CP11-22-000, an application pursuant to section 3 of the Natural Gas Act (NGA), to amend its authorization under NGA section 3 and Presidential Permits to allow it to import and export natural gas from the... NGA be amended to authorize Tennessee to operate bi- directionally two existing international border...

  10. 78 FR 42540 - Endangered and Threatened Species; Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ...-FF06E00000] Endangered and Threatened Species; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... permits to conduct certain activities with endangered species under the authority of the Endangered Species Act, as amended (Act). FOR FURTHER INFORMATION CONTACT: Kathy Konishi, Permit Coordinator...

  11. Permitting program with best management practices for shale gas wells to safeguard public health.

    PubMed

    Centner, Terence J; Petetin, Ludivine

    2015-11-01

    The development of shale gas resources in the United States has been controversial as governments have been tardy in devising sufficient safeguards to protect both people and the environment. Alleged health and environmental damages suggest that other countries around the world that decide to develop their shale gas resources can learn from these problems and take further actions to prevent situations resulting in the release of harmful pollutants. Looking at U.S. federal regulations governing large animal operations under the permitting provisions of the Clean Water Act, the idea of a permitting program is proposed to respond to the risks of pollution by shale gas development activities. Governments can require permits before allowing the drilling of a new gas well. Each permit would include fluids and air emissions reduction plans containing best management practices to minimize risks and releases of pollutants. The public availability of permits and permit applications, as occurs for water pollution under various U.S. permitting programs, would assist governments in protecting public health. The permitting proposals provide governments a means for providing further assurances that shale gas development projects will not adversely affect people and the environment. Copyright © 2015 Elsevier Ltd. All rights reserved.

  12. 77 FR 31044 - Permits Issued Under the Antarctic Conservation Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... NATIONAL SCIENCE FOUNDATION Permits Issued Under the Antarctic Conservation Act AGENCY: National... 95-541. SUMMARY: The National Science Foundation (NSF) is required to publish notice of permits... CONTACT: Nadene G. Kennedy, Permit Office, Office of Polar Programs, Rm. 755, National Science Foundation...

  13. 21 CFR 1210.24 - Temporary permits.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.24 Temporary permits. A temporary permit will be granted... inspections required by the applicable provisions of section 2 of the Federal Import Milk Act. Temporary...

  14. 21 CFR 1210.24 - Temporary permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.24 Temporary permits. A temporary permit will be granted... inspections required by the applicable provisions of section 2 of the Federal Import Milk Act. Temporary...

  15. Stormwater Pollution Prevention Plan - TA-60 Material Recycling Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandoval, Leonard Frank

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA- 60 Material Recycling Facility at Los Alamos National Laboratory. Los Alamosmore » National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60 Material Recycling Facility. The current permit expires at midnight on June 4, 2020.« less

  16. Stormwater Pollution Prevention Plan - TA-60 Asphalt Batch Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandoval, Leonard Frank

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-01 Asphalt Batch Plant at Los Alamos National Laboratory. Los Alamos Nationalmore » Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60 Asphalt Batch Plant and associated areas. The current permit expires at midnight on June 4, 2020.« less

  17. 76 FR 63322 - Endangered and Threatened Species Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ...We, the U.S. Fish and Wildlife Service, invite the public to comment on the following applications to conduct certain activities with endangered or threatened species. The Endangered Species Act of 1973, as amended (Act), prohibits activities with endangered and threatened species unless a Federal permit allows such activities. The Act and the National Environmental Policy Act also require that we invite public comment before issuing these permits.

  18. 76 FR 9611 - Notice of Permit Modification Request Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Modification Request Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit modification request... that the National Science Foundation (NSF) has received a request to modify a permit issued to conduct...

  19. 76 FR 57765 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit...: The National Science Foundation (NSF) is required to publish notice of permit applications received to...

  20. Commonwealth of Pennsylvania. [Establishment of hazardous waste facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Environmental Resources Secretary Arthur A. Davis and Commerce Secretary Raymond R. Christman have announced a joint initiative to establish commercial hazardous waste treatment and disposal facilities Pennsylvania. The state Hazardous Sites Cleanup Act, which Gov. Robert P. Casey signed into law last October, called for accelerated efforts in this regard. These included an expedited permitting process for facilities, requiring the Department of Environmental Resources (DER) to appoint a special sitting team to review permit applications, and designation of sitting coordinator within the Department of Commerce to identify potential developers of the facilities and encourage them to operate within Pennsylvania.

  1. 75 FR 57299 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-20

    ... Antarctic Conservation Act of 1978 (Pub. L. 95-541), as amended by the Antarctic Science, Tourism and Conservation Act of 1996, has developed regulations for the establishment of a permit system for various... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas...

  2. 76 FR 61117 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-03

    ... Antarctic Conservation Act of 1978 (Pub. L. 95-541), as amended by the Antarctic Science, Tourism and Conservation Act of 1996, has developed regulations for the establishment of a permit system for various... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas...

  3. 33 CFR 209.140 - Operations of the Corps of Engineers under the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... directing studies to be made. In the case of an application for permit or license for an unconstructed... required to insure coordination of the applicant's studies with the Division or District Engineer in cases... studies, will when requested by the Chief of Engineers submit an estimate of the cost of the investigation...

  4. 76 FR 12982 - Policy for Guidelines for Coast Guard Evaluations of Compliance With the U.S. Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... permitting program issued under the Clean Water Act (33 U.S.C. 1342) and provides requirements for discharges.... vessels and during Port State Control (PSC) exams on foreign vessels. The Coast Guard will report detected... inspections and exams. Vessel owners and/or operators are ultimately responsible for compliance with all...

  5. 75 FR 53376 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... review and clearance under the Paperwork Reduction Act of 1995, Public Law 104-13 on or after the date of... be received on or before September 30, 2010 to be assured of consideration. Alcohol and Tobacco Tax... operate a brewery. TTB F 5130.10 is similar to a permit and, when approved by TTB, is a brewer's...

  6. 78 FR 1200 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ...Notice is hereby given that NMFS has received an application for a permit for scientific purposes and to enhance the propagation and survival of a listed species under the Endangered Species Act of 1973, as amended (ESA), from the California Department of Fish and Game (CDFG) and PacifiCorp for a 10 year period. As part of this permit application, the CDFG has submitted a draft HGMP. The HGMP specifies methods for the operation of the Iron Gate hatchery coho salmon program, located along the Klamath River, within the State of California. This document serves to notify the public of the availability of the permit application and HGMP for public review and comment prior to a decision by NMFS whether to issue the permit. This notice also announces the availability for public review and comment of a Draft Environmental Assessment (EA) regarding issuance of the permit, which involves take of coho salmon listed as threatened under the ESA.

  7. 77 FR 38834 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit applications received under the Antarctic Conservation Act of 1978. SUMMARY: The National Science Foundation (NSF) is required... Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act. This...

  8. 78 FR 54492 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-04

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit... Science Foundation (NSF) is required to publish a notice of permit applications received to conduct...

  9. 76 FR 30203 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit... Science Foundation (NSF) is required to publish notice of permit applications received to conduct...

  10. 77 FR 6826 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-09

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of permit... Science Foundation (NSF) is required to publish a notice of permit applications received to conduct...

  11. 77 FR 32701 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit... Science Foundation (NSF) is required to publish a notice of permit applications received to conduct...

  12. 75 FR 42462 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-21

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit... Science Foundation (NSF) is required to publish notice of permit applications received to conduct...

  13. 77 FR 51831 - Notice of Permit Applications Received; Under the Antarctic Conservation Act of 1978 (Pub. L. 95...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received; Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit... Science Foundation (NSF) is required to publish a notice of permit applications received to conduct...

  14. 78 FR 33115 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit... Science Foundation (NSF) is required to publish a notice of permit applications received to conduct...

  15. 75 FR 60830 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit... Science Foundation (NSF) is required to publish notice of permit applications received to conduct...

  16. 78 FR 56743 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ...The National Science Foundation (NSF) is required to publish a notice of permit applications received to conduct activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act at Title 45 Part 670 of the Code of Federal Regulations. This is the required notice of permit applications received.

  17. 78 FR 56744 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ...The National Science Foundation (NSF) is required to publish a notice of permit applications received to conduct activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act at Title 45 Part 670 of the Code of Federal Regulations. This is the required notice of permit applications received.

  18. 78 FR 41959 - Notice of Permit Modification Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit modification under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF) is... Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act at Title 45 Part...

  19. 76 FR 58843 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ...The National Science Foundation (NSF) is required to publish a notice of permit applications received to conduct activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act at Title 45 Part 670 of the Code of Federal Regulations. This is the required notice of permit applications received.

  20. 75 FR 65035 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-21

    ...The National Science Foundation (NSF) is required to publish notice of permit applications received to conduct activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act at Title 45 Part 670 of the Code of Federal Regulations. This is the required notice of permit applications received.

  1. 77 FR 31044 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ...The National Science Foundation (NSF) is required to publish a notice of permit applications received to conduct activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act at Title 45 Part 670 of the Code of Federal Regulations. This is the required notice of permit applications received.

  2. 78 FR 53789 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ...The National Science Foundation (NSF) is required to publish a notice of permit applications received to conduct activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act at Title 45 Part 671 of the Code of Federal Regulations. This is the required notice of permit applications received.

  3. 78 FR 66384 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-05

    ...The National Science Foundation (NSF) is required to publish a notice of permit applications received to conduct activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act at Title 45 Part 671 of the Code of Federal Regulations. This is the required notice of permit applications received.

  4. Stormwater Pollution Prevention Plan for the TA-60-02 Salvage Warehouse, Los Alamos National Laboratory, Revision 3, January 2018

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgin, Jillian Elizabeth

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015). Contents of the Junemore » 4, 2015 Multi-sector General Permit can be viewed at: https://www.epa.gov/sites/production/files/2015- 10/documents/msgp2015_finalpermit.pdf This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-02 Salvage and Warehouse facility at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60-02 Salvage/ Warehouse and associated areas. The current permit expires at midnight on June 4, 2020. A copy of the facility NOI and LANS Delegation of Authority Letter are located in Appendix C of this SWPPP.« less

  5. 40 CFR 144.31 - Application for a permit; authorization by permit.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Significant Deterioration (PSD) program under the Clean Air Act. (2) Name, mailing address, and location of... (PSD) program under the Clean Air Act. (v) Nonattainment program under the Clean Air Act. (vi) National...

  6. 40 CFR 144.31 - Application for a permit; authorization by permit.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Significant Deterioration (PSD) program under the Clean Air Act. (2) Name, mailing address, and location of... (PSD) program under the Clean Air Act. (v) Nonattainment program under the Clean Air Act. (vi) National...

  7. 40 CFR 144.31 - Application for a permit; authorization by permit.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Significant Deterioration (PSD) program under the Clean Air Act. (2) Name, mailing address, and location of... (PSD) program under the Clean Air Act. (v) Nonattainment program under the Clean Air Act. (vi) National...

  8. 40 CFR 144.31 - Application for a permit; authorization by permit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Significant Deterioration (PSD) program under the Clean Air Act. (2) Name, mailing address, and location of... (PSD) program under the Clean Air Act. (v) Nonattainment program under the Clean Air Act. (vi) National...

  9. 40 CFR 122.34 - As an operator of a regulated small MS4, what will my NPDES MS4 storm water permit require?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... management program designed to reduce the discharge of pollutants from your MS4 to the maximum extent... Clean Water Act. Your storm water management program must include the minimum control measures described... (BMPs) are generally the most appropriate form of effluent limitations when designed to satisfy...

  10. 40 CFR 122.34 - As an operator of a regulated small MS4, what will my NPDES MS4 storm water permit require?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management program designed to reduce the discharge of pollutants from your MS4 to the maximum extent... Clean Water Act. Your storm water management program must include the minimum control measures described... (BMPs) are generally the most appropriate form of effluent limitations when designed to satisfy...

  11. 40 CFR 122.34 - As an operator of a regulated small MS4, what will my NPDES MS4 storm water permit require?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management program designed to reduce the discharge of pollutants from your MS4 to the maximum extent... Clean Water Act. Your storm water management program must include the minimum control measures described... (BMPs) are generally the most appropriate form of effluent limitations when designed to satisfy...

  12. 40 CFR 122.34 - As an operator of a regulated small MS4, what will my NPDES MS4 storm water permit require?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management program designed to reduce the discharge of pollutants from your MS4 to the maximum extent... Clean Water Act. Your storm water management program must include the minimum control measures described... (BMPs) are generally the most appropriate form of effluent limitations when designed to satisfy...

  13. 40 CFR 122.34 - As an operator of a regulated small MS4, what will my NPDES MS4 storm water permit require?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., accumulated sediments, floatables, and other debris); and ways to ensure that new flood management projects... management program designed to reduce the discharge of pollutants from your MS4 to the maximum extent... Clean Water Act. Your storm water management program must include the minimum control measures described...

  14. A Failed Experiment: Georgia's Tax Credit Scholarships for Private Schools

    ERIC Educational Resources Information Center

    Southern Education Foundation, 2011

    2011-01-01

    Georgia is one of seven states that currently allow tax credits for scholarships to private schools. Georgia's law was enacted in May 2008 in order to assist low income students to transfer out of low performing public schools. Operations under the new act began in late 2008. The law permits taxpayers in Georgia to reduce their annual state taxes…

  15. Joint Tactics, Techniques, and Procedures for Foreign Humanitarian Assistance

    DTIC Science & Technology

    2001-08-15

    violence and nuclear, biological, or chemical (NBC) accidents). DOD policy permits military components to participate in FHA operations in response to...Acts of Man Flood, Drought, Fire, Hurricane, Earthquake Volcanic Eruption Civil Violence Nuclear, Biological, or Chemical Accidents FOREIGN DISASTERS I...Supply shortages developed, particularly of items not ordinarily required by a fighting unit — catheters for small children , for example. Finally

  16. 75 FR 57327 - GNP Rly, Inc.-Acquisition and Operation Exemption-Redmond Spur and Woodinville Subdivision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-20

    ...). Those NITUs permitted railbanking/interim trail use negotiations under the Trails Act, 16 U.S.C. 1247(d... November 19, 2010. ADDRESSES: Comments may be submitted either via the Board's e-filing format or in the traditional paper format. Any person using e-filing should attach a document and otherwise comply with the...

  17. 77 FR 51981 - Notice of Intent To Prepare a Draft Environmental Impact Statement on the Construction and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... assist in meeting State of Florida water quality standards by attenuating peak stormwater flows and... Area A1 Flow Equalization Basin, Palm Beach County, FL AGENCY: Department of the Army, U.S. Army Corps...) permit under Section 404 of the Clean Water Act for construction and operation of a Flow Equalization...

  18. 78 FR 28000 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National Science... regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic...

  19. 77 FR 67407 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National Science... regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic...

  20. 77 FR 4813 - Proposed Reissuance of the NPDES General Permits for Oil and Gas Exploration Facilities on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-31

    ... the conditions of the Beaufort general permit are stringent enough to comply with State water quality... conditions than what is proposed in the Beaufort general permit to ensure compliance with State water quality... Clean Water Act (CWA or ``the Act''), 33 U.S.C. 1342. State Certification of Beaufort General Permit...

  1. 76 FR 30203 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ...The National Science Foundation (NSF) is required to publish a notice of requests to modify permits issued to conduct activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act at Title 45 part 670 of the Code of Federal Regulations. This is the required notice of a requested permit modification.

  2. 77 FR 50720 - Notice of Permit Modification Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ...The National Science Foundation (NSF) is required to publish a notice of requests to modify permits issued to conduct activities regulated under the Antarctic Conservation Act of 1978,, Public Law 95- 541. NSF has published regulations under the Antarctic Conservation Act at Title 45 Part 670 of the Code of Federal Regulations. This is the required notice of a requested permit modification.

  3. 78 FR 57410 - Endangered Species; Issuance of Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ... permits to conduct certain activities with endangered species under the authority of the Endangered Species Act, as amended (Act). ADDRESSES: Endangered Species Program Manager, Ecological Services, U.S...-FF01E00000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  4. Stormwater Pollution Prevention Plan for the TA-03-38 Metals Fabrication Shop, Los Alamos National Laboratory, Revision 3, January 2018

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgin, Jillian Elizabeth

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector AA-Fabricated Metal Products as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-38 Metals Fabrication Shop at Los Alamos National Laboratory. Los Alamos National Laboratorymore » (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-38 Metals Fabrication Shop and associated areas. The current permit expires at midnight on June 4, 2020.« less

  5. Stormwater Pollution Prevention Plan for the TA-60-01 Heavy Equipment Shop, Los Alamos National Laboratory, Revision 3, January 2018

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgin, Jillian Elizabeth

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-01 Heavy Equipment Shop at Los Alamos National Laboratory. Los Alamos Nationalmore » Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60-01 Heavy Equipment Shop and associated areas. The current permit expires at midnight on June 4, 2020.« less

  6. Stormwater Pollution Prevention Plan for the TA-03-38 Carpenter's Shop, Los Alamos National Laboratory, Revision 3, January 2018

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgin, Jillian Elizabeth

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector A–Timber Products, Subsector A4 (Wood Products Facilities not elsewhere classified) as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-38 Carpenter’s Shop at Los Alamosmore » National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-38 Carpenter’s Shop and associated areas. The current permit expires at midnight on June 4, 2020.« less

  7. Stormwater Pollution Prevention Plan for the TA-03-22 Power and Steam Plant, Los Alamos National Laboratory, Revision 3, January 2018

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgin, Jillian Elizabeth

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector O-Steam Electric Generating Facilities as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-22 Power and Steam Plant at Los Alamos National Laboratory. Los Alamosmore » National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-22 Power and Steam Plant and associated areas. The current permit expires at midnight on June 4, 2020.« less

  8. Stormwater Pollution Prevention Plan - TA-60 Roads and Grounds Facility and Associated Sigma Mesa Staging Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandoval, Leonard Frank

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-60 Roads and Grounds and Associated Sigma Mesa Staging Area at Losmore » Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60 Roads and Grounds and Associated Sigma Mesa Staging Area. The current permit expires at midnight on June 4, 2020.« less

  9. Refinery siting workbook: appendices C to O

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Applicable laws and permits available for the selection and building of petroleum refineries are enclosed. A glossary of pertinent terms is also included. References related to the National Environmental Policy Act, the Clean Air Act, the Federal Water Pollution Control Act, Resource Conservation and Recovery Act, Toxic Substance Control Act, and Wetlands and Coastal Zone are included. Permit information is also presented. (DC)

  10. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less

  11. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

    DOE PAGES

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; ...

    2017-04-26

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less

  12. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States.

    PubMed

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; Heath, Garvin

    2017-06-06

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain major source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called "major" or "minor") has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.

  13. 77 FR 64237 - Notice of Approval of Clean Air Act Prevention of Significant Deterioration Permit Issued to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... Air Act Prevention of Significant Deterioration (PSD) permit for the City of Palmdale (City) for the construction of the Palmdale Hybrid Power Project (PHPP). DATES: EPA Region 9 issued a final PSD permit... decision can obtain them at http://www.epa.gov/eab/ . A copy of the PSD permit is also available at http...

  14. 30 CFR 921.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... Laws Ch. 132, sections 40-46; of the Wetlands Protection Act Ch. 131, sections 40-46; statutes and... the State of Massachusetts, including: The Historic and Scenic Rivers Act, Mass. Ann. Laws Ch. 21... Massachusetts Hazardous Waste Management Act Ch. 21C, sections 1-14; the Massachusetts Clean Water Act Ch. 21...

  15. 30 CFR 921.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Laws Ch. 132, sections 40-46; of the Wetlands Protection Act Ch. 131, sections 40-46; statutes and... the State of Massachusetts, including: The Historic and Scenic Rivers Act, Mass. Ann. Laws Ch. 21... Massachusetts Hazardous Waste Management Act Ch. 21C, sections 1-14; the Massachusetts Clean Water Act Ch. 21...

  16. 30 CFR 921.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... Laws Ch. 132, sections 40-46; of the Wetlands Protection Act Ch. 131, sections 40-46; statutes and... the State of Massachusetts, including: The Historic and Scenic Rivers Act, Mass. Ann. Laws Ch. 21... Massachusetts Hazardous Waste Management Act Ch. 21C, sections 1-14; the Massachusetts Clean Water Act Ch. 21...

  17. 30 CFR 921.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... Laws Ch. 132, sections 40-46; of the Wetlands Protection Act Ch. 131, sections 40-46; statutes and... the State of Massachusetts, including: The Historic and Scenic Rivers Act, Mass. Ann. Laws Ch. 21... Massachusetts Hazardous Waste Management Act Ch. 21C, sections 1-14; the Massachusetts Clean Water Act Ch. 21...

  18. 30 CFR 921.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Laws Ch. 132, sections 40-46; of the Wetlands Protection Act Ch. 131, sections 40-46; statutes and... the State of Massachusetts, including: The Historic and Scenic Rivers Act, Mass. Ann. Laws Ch. 21... Massachusetts Hazardous Waste Management Act Ch. 21C, sections 1-14; the Massachusetts Clean Water Act Ch. 21...

  19. 50 CFR 21.26 - Special Canada goose permit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... migratory birds or species designated as endangered or threatened under the authority of the Endangered Species Act. (iii) We will only issue permits to State wildlife agencies in the conterminous United States... 3 of the Migratory Bird Treaty Act. (b) Who may receive a permit? Only State wildlife agencies...

  20. 50 CFR 21.26 - Special Canada goose permit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... migratory birds or species designated as endangered or threatened under the authority of the Endangered Species Act. (iii) We will only issue permits to State wildlife agencies in the conterminous United States... 3 of the Migratory Bird Treaty Act. (b) Who may receive a permit? Only State wildlife agencies...

  1. 50 CFR 21.26 - Special Canada goose permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... migratory birds or species designated as endangered or threatened under the authority of the Endangered Species Act. (iii) We will only issue permits to State wildlife agencies in the conterminous United States... 3 of the Migratory Bird Treaty Act. (b) Who may receive a permit? Only State wildlife agencies...

  2. 76 FR 10623 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-25

    ... endangered species, marine mammals, or both. With some exceptions, the Endangered Species Act (ESA) and Marine Mammal Protection Act (MMPA) prohibit activities with listed species unless a Federal permit is...] Endangered Species; Marine Mammals; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service...

  3. 50 CFR 21.26 - Special Canada goose permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... migratory birds or species designated as endangered or threatened under the authority of the Endangered Species Act. (iii) We will only issue permits to State wildlife agencies in the conterminous United States... 3 of the Migratory Bird Treaty Act. (b) Who may receive a permit? Only State wildlife agencies...

  4. 50 CFR 21.26 - Special Canada goose permit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... migratory birds or species designated as endangered or threatened under the authority of the Endangered Species Act. (iii) We will only issue permits to State wildlife agencies in the conterminous United States... 3 of the Migratory Bird Treaty Act. (b) Who may receive a permit? Only State wildlife agencies...

  5. 76 FR 66089 - Notice of Permit Modification Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Modification Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit modification issued under the Antarctic Conservation of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF...

  6. 76 FR 67485 - Notice of Permit Modification Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Modification Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit issued under the Antarctic Conservation of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF) is required to publish...

  7. 77 FR 50533 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... NATIONAL SCIENCE FOUNDATION Notice of Permits Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permits issued under the Antarctic Conservation of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF) is required to publish notice...

  8. 77 FR 35068 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... NATIONAL SCIENCE FOUNDATION Notice of Permits Issued Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permits issued under the Antarctic Conservation of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF) is required to publish notice...

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Departmentmore » of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.« less

  10. A regional protocol for evaluating the effectiveness of forestry best management practices at controlling erosion and sedimentation

    Treesearch

    Roger Ryder; Pamela Edwards; Pamela Edwards

    2006-01-01

    Forestry operations do not have permitting requirements under the Clean Water Act because there is a ccsilvicultural exemption" given in that law, as long as best management practices (BMPs) are used to help control non-point source pollution. However, states' monitoring of BMP effectiveness often has been sporadic and anecdotal, and the procedures used have...

  11. 50 CFR 22.28 - Permits for bald eagle take exempted under the Endangered Species Act.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the Endangered Species Act. 22.28 Section 22.28 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE... for bald eagle take exempted under the Endangered Species Act. (a) Purpose and scope. This permit... section 7 incidental take statement under the Endangered Species Act of 1973, as amended (ESA) (16 U.S.C...

  12. 50 CFR 22.28 - Permits for bald eagle take exempted under the Endangered Species Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the Endangered Species Act. 22.28 Section 22.28 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE... for bald eagle take exempted under the Endangered Species Act. (a) Purpose and scope. This permit... section 7 incidental take statement under the Endangered Species Act of 1973, as amended (ESA) (16 U.S.C...

  13. 50 CFR 22.28 - Permits for bald eagle take exempted under the Endangered Species Act.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the Endangered Species Act. 22.28 Section 22.28 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE... for bald eagle take exempted under the Endangered Species Act. (a) Purpose and scope. This permit... section 7 incidental take statement under the Endangered Species Act of 1973, as amended (ESA) (16 U.S.C...

  14. 50 CFR 22.28 - Permits for bald eagle take exempted under the Endangered Species Act.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the Endangered Species Act. 22.28 Section 22.28 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE... for bald eagle take exempted under the Endangered Species Act. (a) Purpose and scope. This permit... section 7 incidental take statement under the Endangered Species Act of 1973, as amended (ESA) (16 U.S.C...

  15. 50 CFR 22.28 - Permits for bald eagle take exempted under the Endangered Species Act.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the Endangered Species Act. 22.28 Section 22.28 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE... for bald eagle take exempted under the Endangered Species Act. (a) Purpose and scope. This permit... section 7 incidental take statement under the Endangered Species Act of 1973, as amended (ESA) (16 U.S.C...

  16. 29 CFR 870.11 - Exceptions to the restrictions provided by section 303(a) of the CCPA and priorities among...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Act. (2) Accordingly the Consumer Credit Protection Act does not restrict in any way the amount which..., the Consumer Credit Protection Act permits garnishment for the support of any person of only the... debt, and these garnishments have priority, the Consumer Credit Protection Act does not permit...

  17. 78 FR 54685 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National... activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  18. 76 FR 58049 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National... activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  19. 75 FR 62892 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub .L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... Conservation Act of 1978 (Pub .L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit Modification Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National... activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  20. 78 FR 52218 - Notice of permit applications received under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-22

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of permit applications received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National... activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  1. 76 FR 50272 - Notice of Permit Modification Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit Modification Request Received under the Antarctic Conservation Act of 1978, Pub. L. 95-541. SUMMARY: The... conduct activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations...

  2. 75 FR 62891 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National... activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  3. 76 FR 52354 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National... activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  4. 78 FR 59728 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice. SUMMARY: The National Science... regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the Antarctic Conservation Act at Title 45 Part 670 of the Code of Federal Regulations. This is the required notice of permit...

  5. 78 FR 9072 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-07

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National... activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  6. 75 FR 54389 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit Modification Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National... activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  7. 75 FR 25300 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National... activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  8. 76 FR 30397 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit Modification Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National... activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  9. 78 FR 58568 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received under the Antarctic Conservation Act of 1978, Public Law 95-541. SUMMARY: The National... activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  10. 21 CFR 1210.27 - Permits waiving clauses 2 and 5, section 2 of the Federal Import Milk Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Federal Import Milk Act. 1210.27 Section 1210.27 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG ADMINISTRATION REGULATIONS UNDER THE FEDERAL IMPORT MILK ACT Permit Control § 1210.27...

  11. 21 CFR 1210.27 - Permits waiving clauses 2 and 5, section 2 of the Federal Import Milk Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Federal Import Milk Act. 1210.27 Section 1210.27 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG ADMINISTRATION REGULATIONS UNDER THE FEDERAL IMPORT MILK ACT Permit Control § 1210.27...

  12. NPDES permit compliance and enforcement: A resource guide for oil and gas operators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-12-01

    During the fall of 1996, the Interstate Oil and Gas Compact Commission sponsored sessions for government and industry representatives to discuss concerns about the National Pollution Discharge Elimination System (NPDES) program under the Clean Water Act. In January 1997, the NPDES Education/Communication/Training Workgroup (ECT Workgroup) was established with co-leaders from the Environmental Protection Agency (EPA) and industry. The ECT Workgroup`s purpose was to develop ideas that would improve communication between NPDES regulators and the oil and gas industry regarding NPDES compliance issues. The Workgroup focused on several areas, including permit compliance monitoring and reporting, enforcement activity and options, and treatmentmore » technology. The ECT Workgroup also discussed the need for materials and information to help NPDES regulatory agency personnel understand more about oil and gas industry exploration and extraction operations and treatment processes. This report represents a compendium of the ECT Workgroup`s efforts.« less

  13. 78 FR 40968 - Notice of Extension of Deadline to Commence Construction Under Clean Air Act Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ...'') has extended the Prevention of Significant Deterioration (``PSD'') permit deadline for commencing construction for a final Clean Air Act PSD permit that authorizes Avenal Power Center, LLC (``APC'') to...: EPA's PSD permit for the AEP became effective on August 18, 2011, and included a deadline for...

  14. 30 CFR 905.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) National Historic Preservation Act, 16 U.S.C. 470 et seq CEQA. (7) Coastal Zone Management Act, 16 U.S.C. 1451, 1453-1464 California Coastal Act of 1976, Cal. Pub. Res. Code section 30000 et seq. (West 1986... section 46000 et seq. (West Supp. 1986). (12) Bald Eagle Protection Act, 16 U.S.C. 668-668(d) (c) Where...

  15. HYDRAULIC SERVO CONTROL MECHANISM

    DOEpatents

    Hussey, R.B.; Gottsche, M.J. Jr.

    1963-09-17

    A hydraulic servo control mechanism of compact construction and low fluid requirements is described. The mechanism consists of a main hydraulic piston, comprising the drive output, which is connected mechanically for feedback purposes to a servo control piston. A control sleeve having control slots for the system encloses the servo piston, which acts to cover or uncover the slots as a means of controlling the operation of the system. This operation permits only a small amount of fluid to regulate the operation of the mechanism, which, as a result, is compact and relatively light. This mechanism is particuiarly adaptable to the drive and control of control rods in nuclear reactors. (auth)

  16. 40 CFR 124.10 - Public notice of permit actions and public comment period.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... issued or is required to issue a RCRA, UIC, PSD (or other permit under the Clean Air Act), NPDES, 404... (CONTINUED) WATER PROGRAMS PROCEDURES FOR DECISIONMAKING General Program Requirements § 124.10 Public notice... Act for the same facility or activity (including EPA when the draft permit is prepared by the State...

  17. Section 404 of the Clean Water Act

    EPA Pesticide Factsheets

    Information about the Clean Water Act permitting program for dredge or fill material into waters of the US, including roles, 401 certification of permits, state/tribal assumption of 404 program, mitigation requirements, regulations

  18. Employment Needs of Amish Youth. Hearing before a Subcommittee of the Committee on Appropriations, United States Senate, One Hundred Seventh Congress, First Session. Special Hearing.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC.

    A Senate subcommittee hearing received testimony concerning a proposed amendment to the Fair Labor Standards Act (FLSA) to permit Amish youth, ages 14-18, to work under adult supervision in sawmills. Current Department of Labor regulations ban the employment of minors in sawmill operations. This poses a problem for Amish youth who finish their…

  19. 78 FR 48200 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Applications Received Under the Antarctic Conservation Act of 1978, Pub. L. 95-541. SUMMARY: The National... activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  20. 30 CFR 939.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... law, including: the Wetlands Protection Act (R.I. General Laws Section 2-1-22); Chapter 20 of the Waters and Navigation Act (petitions for ditches and drains) (R.I. General Laws Section 46-20-1 et seq... supplementary information to ensure compliance with applicable Federal laws and regulations other than the Act...

  1. 30 CFR 939.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... law, including: the Wetlands Protection Act (R.I. General Laws Section 2-1-22); Chapter 20 of the Waters and Navigation Act (petitions for ditches and drains) (R.I. General Laws Section 46-20-1 et seq... supplementary information to ensure compliance with applicable Federal laws and regulations other than the Act...

  2. 30 CFR 939.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... law, including: the Wetlands Protection Act (R.I. General Laws Section 2-1-22); Chapter 20 of the Waters and Navigation Act (petitions for ditches and drains) (R.I. General Laws Section 46-20-1 et seq... supplementary information to ensure compliance with applicable Federal laws and regulations other than the Act...

  3. 30 CFR 939.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... law, including: the Wetlands Protection Act (R.I. General Laws Section 2-1-22); Chapter 20 of the Waters and Navigation Act (petitions for ditches and drains) (R.I. General Laws Section 46-20-1 et seq... supplementary information to ensure compliance with applicable Federal laws and regulations other than the Act...

  4. 30 CFR 939.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... law, including: the Wetlands Protection Act (R.I. General Laws Section 2-1-22); Chapter 20 of the Waters and Navigation Act (petitions for ditches and drains) (R.I. General Laws Section 46-20-1 et seq... supplementary information to ensure compliance with applicable Federal laws and regulations other than the Act...

  5. 78 FR 57170 - Endangered and Threatened Wildlife and Plants; Recovery Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ....gov (email). SUPPLEMENTARY INFORMATION: Background The Act (16 U.S.C. 1531 et seq.) prohibits... available for review, subject to the requirements of the Privacy Act (5 U.S.C. 552a) and Freedom of Information Act (5 U.S.C. 552). Permit Application Number: TE046795 Applicant: Colorado State University...

  6. 78 FR 59051 - Endangered and Threatened Wildlife and Plants; Recovery Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ....gov (email). SUPPLEMENTARY INFORMATION: Background The Act (16 U.S.C. 1531 et seq.) prohibits... their applications are available for review, subject to the requirements of the Privacy Act (5 U.S.C. 552a) and Freedom of Information Act (5 U.S.C. 552). Permit Application Number: TE046427 Applicant...

  7. 77 FR 7175 - Endangered and Threatened Species Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    .... SUPPLEMENTARY INFORMATION: Public Availability of Comments The Act (16 U.S.C. 1531 et seq.) prohibits activities... these applications are available for review, subject to the requirements of the Privacy Act (5 U.S.C. 552a) and Freedom of Information Act (5 U.S.C. 552). Permit TE-202343 Applicant: Daniel Ginter...

  8. 75 FR 56147 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... received. Permits were issued on September 9, 2010 to: Sam Feola Permit No. 2011-009. Sam Feola Permit No. 2011-010. Sam Feola Permit No. 2011-011. Sam Feola Permit No. 2011-012. Sam Feola Permit No. 2011-013. Sam Feola Permit No. 2011-014. Sam Feola Permit No. 2011-015. Nadene G. Kennedy, Permit Officer. [FR...

  9. 75 FR 34983 - Order (1) Pursuant to Section 4(c) of the Commodity Exchange Act, Permitting the Kansas City...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... Act, Permitting the Kansas City Board of Trade Clearing Corporation To Clear Over-the-Counter Wheat...-the-counter (OTC) swap agreements (swaps) in wheat. Authority for granting this request is found in... grant KCBTCC approval to clear OTC wheat calendar swaps, and it would permit KCBT to list those products...

  10. Financial responsibilities under RCRA. Hearing before the Subcommittee on Commerce, Transportation, and Tourism of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, First Session on H. R. 3692, November 13, 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-01-01

    Representatives of environmental organizations, the Hazardous Waste Treatment Council, and regulators were among those testifying at a hearing on H.R. 3692, which amends the Resource Conservation and Recovery Act (RCRA) of 1976. The bill is in response to concerns that the Environmental Protection Agency (EPA) has not compiled with the intent of RCRA in its failure to move beyond interim permits to issue final permits to land disposal facilities accepting hazardous wastes. Reported leakage and environmental risks from sites operating under interim permits raises questions about how disposal companies could deal with liability claims. At issue was whether Congress needsmore » to take new action to develop regulations under which financially responsible companies can operate or whether new EPA rules can solve the problem. A spokesman for EPA reviewed the liability insurance problem and the status of the insurance market in this context. Material submitted for the record follows the text of H.R. 3692 and the testimony of 11 witnesses.« less

  11. 40 CFR 72.72 - Criteria for State operating permit program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...

  12. 40 CFR 72.72 - Criteria for State operating permit program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...

  13. 40 CFR 72.72 - Criteria for State operating permit program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...

  14. 40 CFR 72.72 - Criteria for State operating permit program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...

  15. 40 CFR 72.72 - Criteria for State operating permit program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...

  16. Secondary Waste Form Development and Optimization—Cast Stone

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sundaram, S. K.; Parker, Kent E.; Valenta, Michelle M.

    2011-07-14

    Washington River Protection Services is considering the design and construction of a Solidification Treatment Unit (STU) for the Effluent Treatment Facility (ETF) at Hanford. The ETF is a Resource Conservation and Recovery Act-permitted, multi-waste, treatment and storage unit and can accept dangerous, low-level, and mixed wastewaters for treatment. The STU needs to be operational by 2018 to receive secondary liquid wastes generated during operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP). The STU to ETF will provide the additional capacity needed for ETF to process the increased volume of secondary wastes expected to be produced by WTP.

  17. 78 FR 12777 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-25

    ... with endangered species, marine mammals, or both. With some exceptions, the Endangered Species Act (ESA... Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.), and the Marine Mammal Protection Act of...-FF09A30000] Endangered Species; Marine Mammals; Receipt of Applications for Permit AGENCY: Fish and Wildlife...

  18. 77 FR 66476 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... with endangered species, marine mammals, or both. With some exceptions, the Endangered Species Act (ESA... Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.), and the Marine Mammal Protection Act of...-FF09A30000] Endangered Species; Marine Mammals; Receipt of Applications for Permit AGENCY: Fish and Wildlife...

  19. 77 FR 13349 - Endangered and Threatened Wildlife and Plants; Recovery Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... (email). SUPPLEMENTARY INFORMATION: Background The Act (16 U.S.C. 1531 et seq.) prohibits activities with... are available for review, subject to the requirements of the Privacy Act (5 U.S.C. 552a) and Freedom of Information Act (5 U.S.C. 552). Permit Application Number: TE-047250 Applicant: Joe Maurier...

  20. Air Permitting Streamlining Techniques and Approaches for Greenhouse Gases, 2012

    EPA Pesticide Factsheets

    This report presents potential GHG permit streamlining options and observations developed by the Clean Air Act Advisory Committee (CAAAC): Permits, New Source Review and Toxics Subcommittee GHG Permit Streamlining Workgroup

  1. Special and Research Permits for Ocean Dumping

    EPA Pesticide Factsheets

    Special permits and research permits under the Marine Protection, Research and Sanctuaries Act may be issued by EPA for ocean dumping. Examples and ocean disposal sites for special and research permits are provided.

  2. Standard Local Operating Procedures for Endangered Species (SLOPES) for Selected Nationwide Permit Activities Affecting Bull Trout in Western Montana and Northern Idaho. Endangered Species Act Section 7 Consultation: Biological Opinion

    DTIC Science & Technology

    2013-05-17

    include, in order of importance, non-native species, water withdrawals, angling and poaching , forestry practices management and legacy mining impacts ...Dunham et al. 2007, Isaak et al. 2010). A growing body of literature has linked these hydrologic trends with impacts to aquatic 31 ecosystems and...7 Impact Category 1 – Short-term Disturbance

  3. 47 CFR 13.7 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... are twelve types of commercial radio operator licenses, certificates and permits (licenses). The... Radiotelephone Operator License (radiotelephone operator's general certificate). (6) Marine Radio Operator Permit (radiotelephone operator's restricted certificate). (7) Restricted Radiotelephone Operator Permit (radiotelephone...

  4. 47 CFR 13.7 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... are twelve types of commercial radio operator licenses, certificates and permits (licenses). The... Radiotelephone Operator License (radiotelephone operator's general certificate). (6) Marine Radio Operator Permit (radiotelephone operator's restricted certificate). (7) Restricted Radiotelephone Operator Permit (radiotelephone...

  5. Closure of hazardous and mixed radioactive waste management units at DOE facilities. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure ofmore » each of the following hazardous waste management units regulated under RCRA.« less

  6. 78 FR 56247 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-12

    ... the Antarctic Science, Tourism and Conservation Act of 1996, has developed regulations for the... the permit . Litchfield Island has thriving and pristine peat moss bank communities. Samples could be...

  7. 76 FR 39905 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... Science Foundation (NSF) is required to publish notice of permit applications received to conduct activities regulated under the Antarctic Conservation Act of 1978. NSF has published regulations under the...

  8. 30 CFR 947.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...: Washington Forest Practices Act, Chapter 76.09 RCW. (9) Endangered Species Act, 16 U.S.C. 1531 et seq Natural...: Federal law Washington law (1) Clean Water Act, as amended 33 U.S.C. 1251 et seq Water Pollution Control... information must be supplied and negotiate the date by which the information must be submitted; or (iii) Judge...

  9. 30 CFR 947.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: Washington Forest Practices Act, Chapter 76.09 RCW. (9) Endangered Species Act, 16 U.S.C. 1531 et seq Natural...: Federal law Washington law (1) Clean Water Act, as amended 33 U.S.C. 1251 et seq Water Pollution Control... information must be supplied and negotiate the date by which the information must be submitted; or (iii) Judge...

  10. 30 CFR 947.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...: Washington Forest Practices Act, Chapter 76.09 RCW. (9) Endangered Species Act, 16 U.S.C. 1531 et seq Natural...: Federal law Washington law (1) Clean Water Act, as amended 33 U.S.C. 1251 et seq Water Pollution Control... information must be supplied and negotiate the date by which the information must be submitted; or (iii) Judge...

  11. 50 CFR 15.24 - Permits for cooperative breeding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.24 Permits for cooperative breeding. (a) Application requirements for permits for cooperative breeding. Each... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Permits for cooperative breeding. 15.24...

  12. 50 CFR 15.24 - Permits for cooperative breeding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.24 Permits for cooperative breeding. (a) Application requirements for permits for cooperative breeding. Each... 50 Wildlife and Fisheries 1 2011-10-01 2011-10-01 false Permits for cooperative breeding. 15.24...

  13. 50 CFR 15.24 - Permits for cooperative breeding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.24 Permits for cooperative breeding. (a) Application requirements for permits for cooperative breeding. Each... 50 Wildlife and Fisheries 1 2012-10-01 2012-10-01 false Permits for cooperative breeding. 15.24...

  14. 77 FR 6112 - Notice of Final National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... Elimination System (NPDES) General Permit for Discharges From Concentrated Animal Feeding Operations (CAFOs... permit for discharges from eligible owners/operators of concentrated animal feeding operations (CAFOs... of the final permit, animal feeding operations that are defined as CAFOs or designated as CAFOs by...

  15. 77 FR 53923 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... civilian support contractor, Lockheed Martin, Antarctic Support Contract took over on April 1, 2012... No. 2011-013 Permit No. 2011-014 Permit No. 2011-015 Lockheed Martin has been issued some permits to...

  16. 47 CFR 80.151 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements § 80.151 Classification of.... Restricted Radiotelephone Operator Permit (radiotelephone operator's restricted certificate). (2) RL. Restricted Radiotelephone Operator Permit-Limited Use. (3) MP. Marine Radio Operator Permit (radiotelephone...

  17. 47 CFR 80.151 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements § 80.151 Classification of.... Restricted Radiotelephone Operator Permit (radiotelephone operator's restricted certificate). (2) RL. Restricted Radiotelephone Operator Permit-Limited Use. (3) MP. Marine Radio Operator Permit (radiotelephone...

  18. 47 CFR 80.151 - Classification of operator licenses and endorsements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements § 80.151 Classification of.... Restricted Radiotelephone Operator Permit (radiotelephone operator's restricted certificate). (2) RL. Restricted Radiotelephone Operator Permit-Limited Use. (3) MP. Marine Radio Operator Permit (radiotelephone...

  19. Considerations for State Leaders in the Design of School Accountability Systems under the "Every Student Succeeds Act"

    ERIC Educational Resources Information Center

    Marion, Scott

    2016-01-01

    The Elementary and Secondary Schools Education Act (ESEA) was finally reauthorized as the Every Student Succeeds Act (ESSA). The reauthorization was long overdue and with its passage comes much hype and some misinformation about what the law permits and does not permit. The purpose of this brief is to outline some of the key accountability…

  20. 75 FR 34434 - Request To Amend an Existing Order Under Section 4(c) of the Commodity Exchange Act Permitting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ...) pursuant to Section 4(c) of the Act, (a) to permit the clearing of coffee, sugar, and cocoa OTC swap..., ``a * * * commodity swap,'' which latter term includes swaps on agricultural products. While the...(c) of the Act, ICE Clear could not engage in the clearing of OTC swap contracts in cocoa, sugar and...

  1. Permit Limit and Monitoring Requirements Report Help ...

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  2. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Permit number. 1210.21 Section 1210.21 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk...

  3. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Permit number. 1210.21 Section 1210.21 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk...

  4. 75 FR 14627 - Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... comment on the following applications to conduct certain activities with endangered species, marine mammals, or both. With some exceptions, the Endangered Species Act (ESA) and Marine Mammal Protection Act... activities. Both laws require that we invite public comment before issuing these permits. DATES: We must...

  5. 76 FR 32223 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-03

    .... With some exceptions, the Endangered Species Act (ESA) prohibit activities with listed species unless a... carry out our conservation responsibilities for affected species, the Endangered Species Act of 1973...] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service, Interior. ACTION...

  6. 75 FR 47625 - Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... comment on the following applications to conduct certain activities with endangered species, marine mammals, or both. With some exceptions, the Endangered Species Act (ESA) and Marine Mammal Protection Act... activities. Both laws require that we invite public comment before issuing these permits. DATES: We must...

  7. 78 FR 21114 - Magnuson-Stevens Act Provisions; General Provisions for Domestic Fisheries; Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-09

    ...-Stevens Act Provisions; General Provisions for Domestic Fisheries; Application for Exempted Fishing... preliminary determination that an Exempted Fishing Permit (EFP) application contains all of the required information and warrants further consideration. This Exempted Fishing Permit would exempt commercial fishing...

  8. 47 CFR 13.9 - Eligibility and application for new license or endorsement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS... Operator License, Marine Radio Operator Permit, First Class Radiotelegraph Operator's Certificate, Second... Restricted Radiotelephone Operator Permit or a Restricted Radiotelephone Operator Permit-Limited Use must be...

  9. Government Shutdown: Operations of the Department of Defense During a Lapse in Appropriations

    DTIC Science & Technology

    2013-10-15

    federal civilian employees required to hold membership in the reserves as a condition of their civilian employment —will continue to perform their civilian...derive from such obligations (i.e., the payment of bills with checks or electronic remittances ) are prohibited. As a result, though uniformed...activities are understood to be “authorized by law” under Section 1341 of the Antideficiency Act or to permit the employment of personal services for

  10. Reducing concentrated animal feeding operations permitting requirements.

    PubMed

    Centner, T J; Newton, G L

    2011-12-01

    Many owners and operators of concentrated animal feeding operations (CAFO) need to secure National Pollutant Discharge Elimination System permits from the federal or state permitting authority. Because of the expense and inconvenience of permit applications, farm groups have challenged revisions to the federal CAFO Rule as well as state regulations claiming selected provisions exceeded the authority of the permitting agency. In 2011, 2 courts responded with decisions that clarify federal and state permitting regulations. Another goal of agricultural groups is to change the regulatory authority of the state from an environmental agency to a department of agriculture. These developments suggest that by altering the permitting authority, CAFO owners and operators may alleviate some of the burdens of the permitting process.

  11. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  12. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  13. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  14. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  15. EPA's Draft 2017 Construction General Permit (CGP)

    EPA Pesticide Factsheets

    EPA is preparing to reissue the Construction General Permit (CGP). The general permit, issued under the Clean Water Act's National Pollutant Discharge Elimination System, authorizes stormwater discharges from construction activities.

  16. 75 FR 34766 - Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... comment on the following applications to conduct certain activities with endangered species. With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed species unless a Federal permit... conservation responsibilities for affected species, the Endangered Species Act of 1973, section 10(a)(1)(A), as...

  17. 75 FR 44986 - Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... comment on the following applications to conduct certain activities with endangered species, marine mammals, or both. With some exceptions, the Endangered Species Act (ESA) and Marine Mammal Protection Act... activities. The Both laws require that we invite public comment before issuing these permits. DATES: We must...

  18. 75 FR 52971 - Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... requests a permit to import biological samples of polar bears (Ursus maritimus) from Norway for the purpose... comment on the following applications to conduct certain activities with endangered species, marine mammals, or both. With some exceptions, the Endangered Species Act (ESA) and Marine Mammal Protection Act...

  19. 76 FR 6811 - Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ...] Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II Wind Energy... application from Kaheawa Wind Power II, LLC (KWP II) for an incidental take permit (permit) under the... construction and operation of the KWP II wind energy facility on the island of Maui. The permit application...

  20. ER Consolidated Qtrly Rpt_April thru June 2015_October 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, John

    2015-10-01

    This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit, and the Compliance Order on Consent. The 13 sites in the Corrective Action process are listed in Table I-1. Because the status of any Long-Term Stewardship (LTS) activity is detailed in other reports, Section I.3.0 (titled Long-Term Stewardship Work Completed) will not be presented in future ER Quarterly Reports. Section I.3.0 of this ER Quarterly Report identifies the other reports that detail LTS activities.

  1. H. R. 1376: A bill to amend titles II, V, and VII of the Surface Mining Control and Reclamation Act of 1977 to make the mining of coal without a permit a criminal offense, and for other purposes. Introduced in the House of Representatives, One Hundredth First Congress, First Session, March 13, 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    This bill amends the 250 ton limit listed in section I. to read 25 ton limit. It would make it a criminal offense to knowingly remove, transport, sell, or purchase coal from a surface mining operation without a permit required by State or Federal governments. A person convicted under this law would be prohibited from obtaining permits for the extraction or processing of coal. Property of the convicted person subject to forfeiture would be all coal involved; all moneys or securities used in the exchange; and all materials, products, implements, machinery, conveyance, equipment, and property of any kind used ormore » intended for use in extracting, conveying, storing, or delivering coal mined in violation of this law.« less

  2. 12 CFR 225.86 - What activities are permissible for any financial holding company?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Board permits. (c) Activities permitted under section 4(k)(4) of the BHC Act (12 U.S.C. 1843(k)(4)). Any... Act (12 U.S.C. 1843(k)(4)(A) through (E), (H) and (I)). (d) Activities determined to be financial in... Bank Holding Company Act (12 U.S.C. 1843(k)(5)). (1) The following types of activities are financial in...

  3. ICIS-NPDES Permit Limit and Discharge Monitoring Report ...

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  4. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  5. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  6. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  7. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  8. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  9. 40 CFR 144.38 - Transfer of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) UNDERGROUND INJECTION CONTROL PROGRAM Authorization by Permit § 144.38 Transfer of permits. (a) Transfers by... incorporate such other requirements as may be necessary under the Safe Drinking Water Act. (b) Automatic...

  10. 76 FR 71069 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    .... With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed species unless...) of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.), requires that we invite...] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service, Interior. ACTION...

  11. 77 FR 20838 - Endangered Species; Receipt of Applications for Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... endangered species. With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed... responsibilities for affected species, and in consideration of section 10(a)(1)(A) of the Endangered Species Act of...-FF09A30000] Endangered Species; Receipt of Applications for Permits AGENCY: Fish and Wildlife Service...

  12. 78 FR 56924 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... endangered species. With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed... responsibilities for affected species, and in consideration of section 10(a)(1)(A) of the Endangered Species Act of...-FF09A30000] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service...

  13. 77 FR 59961 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ... endangered species. With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed... affected species, and in consideration of section 10(a)(1)(A) of the Endangered Species Act of 1973, as...-FF09A30000] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service...

  14. 76 FR 60862 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    .... With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed species unless...) of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.), require that we invite...] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service, Interior. ACTION...

  15. 76 FR 52965 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    .... With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed species unless...) of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.), requires that we invite...] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service, Interior. ACTION...

  16. 78 FR 59052 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ... endangered species. With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed... responsibilities for affected species, and in consideration of section 10(a)(1)(A) of the Endangered Species Act of...-FF09A30000] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service...

  17. 76 FR 66954 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    .... With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed species unless...) of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.), requires that we invite...] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service, Interior. ACTION...

  18. 76 FR 27660 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    .... With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed species unless... responsibilities for affected species, the Endangered Species Act of 1973, section 10(a)(1)(A), as amended (16 U.S...] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service, Interior. ACTION...

  19. 76 FR 51051 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... endangered species. With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed...) of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.), and our regulations in...] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service, Interior. [[Page...

  20. 77 FR 17009 - Review of Federal Permit Conditions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... the Alaska Natural Gas Pipeline Act (15 U.S.C. 720) with respect to federal permit conditions imposed on the gas pipeline project. This policy statement will establish the agency's procedures for... the Alaska Natural Gas Pipeline Act. DATES: Submit comments on or before April 23, 2012. ADDRESSES...

  1. 18 CFR 4.80 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...

  2. 18 CFR 4.80 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...

  3. 18 CFR 4.80 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...

  4. 18 CFR 4.80 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...

  5. 18 CFR 4.80 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...

  6. 78 FR 12776 - Endangered and Threatened Species Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-25

    .... SUPPLEMENTARY INFORMATION: Public Availability of Comments The Act (16 U.S.C. 1531 et seq.) prohibits activities... (5 U.S.C. 552a) and Freedom of Information Act (5 U.S.C. 552). Permit TE-022190 Applicant: Arizona... pupfish (Cyprinodon elegans) Devils River minnow (Dionda diaboli) Fountain darter (Etheostoma fonticola...

  7. 12 CFR 563f.9 - Interlocking relationships permitted pursuant to Federal Deposit Insurance Act.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Federal Deposit Insurance Corporation pursuant to section 13(k)(1)(A)(v) of the Federal Deposit Insurance Act, as amended (12 U.S.C. 1823(k)(1)(A)(v)). ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interlocking relationships permitted pursuant...

  8. 12 CFR 563f.9 - Interlocking relationships permitted pursuant to Federal Deposit Insurance Act.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Federal Deposit Insurance Corporation pursuant to section 13(k)(1)(A)(v) of the Federal Deposit Insurance Act, as amended (12 U.S.C. 1823(k)(1)(A)(v)). ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Interlocking relationships permitted pursuant...

  9. 75 FR 54649 - Endangered Wildlife; Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-NXXX; 10120-1113-0000-F5] Endangered Wildlife; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of... Species Act of 1973, as amended (Act), we, the U.S. Fish and Wildlife Service (Service), invite the public...

  10. 75 FR 3731 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging-Permit Number IDG-37-0000

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA exempts... permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or...

  11. 18 CFR 50.11 - General conditions applicable to permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... applicable to permits. 50.11 Section 50.11 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT APPLICATIONS FOR PERMITS TO SITE INTERSTATE ELECTRIC TRANSMISSION FACILITIES § 50.11 General conditions applicable to permits...

  12. Ocean Disposal of Marine Mammal Carcasses

    EPA Pesticide Factsheets

    Ocean dumping of marine mammal carcasses is allowed with a permit issued by EPA under the Marine Protection, Research and Sanctuaries Act. Includes permit information, potential environmental impacts, and instructions for getting the general permit.

  13. 40 CFR 49.9868 - Permits to construct.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9868 Permits to construct. Permits to...

  14. 43 CFR 3261.16 - Can my operations plan, drilling permit, and drilling program apply to more than one well?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Can my operations plan, drilling permit... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can my operations plan, drilling permit, and drilling program apply to more than one well? (a) Your...

  15. 77 FR 34061 - Endangered Species; Issuance of Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  16. 78 FR 37565 - Endangered Species; Issuance of Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  17. 78 FR 56922 - Endangered Species; Issuance of Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  18. 78 FR 27255 - Endangered Species; Issuance of Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  19. 78 FR 77122 - Proposed Modification of a General NPDES Permit for Small Suction Dredging-Permit Number IDG-37-0000

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ... required by section 553 of the Administrative Procedure Act (APA), or any other law, to publish general... entities.'' EPA has concluded that NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or the RFA. Notwithstanding that general permits are...

  20. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  1. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  2. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  3. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  4. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  5. Identification of Provisions of EPA's Part 70 Operating Permits Regulation Applicable to Tribal Operating Permits Program

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  6. 50 CFR 15.25 - Permits for personal pets.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.25 Permits... to whether the exotic bird was bred in captivity or taken from the wild; (2) A statement of the...

  7. 50 CFR 15.25 - Permits for personal pets.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.25 Permits... to whether the exotic bird was bred in captivity or taken from the wild; (2) A statement of the...

  8. 77 FR 2314 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... endangered species. With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed... consideration of section 10(a)(1)(A) of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq...-FF09A30000] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service...

  9. 78 FR 30325 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... with endangered species, marine mammals, or both. With some exceptions, the Endangered Species Act (ESA... responsibilities for affected species, and in consideration of section 10(a)(1)(A) of the Endangered Species Act of...-FF09A30000] Endangered Species; Marine Mammals; Receipt of Applications for Permit AGENCY: Fish and Wildlife...

  10. 78 FR 45954 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... endangered species. With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed..., and in consideration of section 10(a)(1)(A) of the Endangered Species Act of 1973, as amended (16 U.S...-FF09A30000] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service...

  11. 78 FR 65352 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... with endangered species, marine mammals, or both. With some exceptions, the Endangered Species Act (ESA... responsibilities for affected species, and in consideration of section 10(a)(1)(A) of the Endangered Species Act of...-FF09A30000] Endangered Species; Marine Mammals; Receipt of Applications for Permit AGENCY: Fish and Wildlife...

  12. 78 FR 52966 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... with endangered species, marine mammals, or both. With some exceptions, the Endangered Species Act (ESA... responsibilities for affected species, and in consideration of section 10(a)(1)(A) of the Endangered Species Act of...-FF09A30000] Endangered Species; Marine Mammals; Receipt of Applications for Permit AGENCY: Fish and Wildlife...

  13. 77 FR 38652 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... endangered species. With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed..., and in consideration of section 10(a)(1)(A) of the Endangered Species Act of 1973, as amended (16 U.S...-FF09A30000] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service...

  14. 76 FR 80384 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... endangered species. With some exceptions, the Endangered Species Act (ESA) prohibits activities with listed... of section 10(a)(1)(A) of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq...-FF09A30000] Endangered Species; Receipt of Applications for Permit AGENCY: Fish and Wildlife Service...

  15. 78 FR 1759 - Notice of Approval of Clean Air Act Outer Continental Shelf Minor Source/Title V Minor Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-09

    ... Outer Continental Shelf Minor Source/Title V Minor Permit Modification Issued to Shell Offshore, Inc. for the Kulluk Conical Drilling Unit AGENCY: United States Environmental Protection Agency (EPA... decision granting Shell Offshore Inc.'s (``Shell'') request for minor modifications of Clean Air Act Outer...

  16. 75 FR 28278 - Endangered Wildlife and Plants; Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N092; 10120-1113-0000-F5] Endangered Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of... Endangered Species Act of 1973, as amended (Act), we, the U.S. Fish and Wildlife Service (Service), invite...

  17. 75 FR 20622 - Endangered Wildlife and Plants; Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N054; 10120-1113-0000-F5] Endangered Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of... Endangered Species Act of 1973, as amended (Act), we, the U.S. Fish and Wildlife Service (Service), invite...

  18. 16 CFR 300.34 - Reference to existing guaranty on labels not permitted.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 1 2011-01-01 2011-01-01 false Reference to existing guaranty on labels not permitted. 300.34 Section 300.34 Commercial Practices FEDERAL TRADE COMMISSION REGULATIONS UNDER SPECIFIC ACTS OF CONGRESS RULES AND REGULATIONS UNDER THE WOOL PRODUCTS LABELING ACT OF 1939 Guaranties § 300.34...

  19. 77 FR 25733 - Receipt of Applications for Endangered Species Permits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    ... Species Act (ESA) prohibits activities with listed species unless a Federal permit is issued that allows... 904/731-3191; facsimile 904/731-3045. SUPPLEMENTARY INFORMATION: The public is invited to comment on... is provided under section 10(c) of the Act. If you wish to comment, you may submit comments by any...

  20. 30 CFR 905.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 42 U.S.C. 7401 et seq California Air Pollution Control Laws, Cal. Health & Safety Code section 39000... (11) Noise Control Act, 42 U.S.C. 4903 California Noise Control Act of 1973, Cal. Health & Safety Code... Pollution Control Laws, Cal. Health & Safety Code section 39000 et seq.; the Hazardous Waste Control Law...

  1. 78 FR 14024 - Financial Market Utilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ... addition, section 806(c) of the Dodd-Frank Act permits a Reserve Bank to pay interest on the balances... the Dodd-Frank Act permits a Federal Reserve Bank to pay earnings on balances maintained by or on... amendments clarify the authority and terms for a Reserve Bank to pay interest on any balances held by a...

  2. 19 CFR 12.7 - Permits required for importation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Department of Health and Human Services under the said act require that each container of milk or cream... THE TREASURY SPECIAL CLASSES OF MERCHANDISE Milk and Cream § 12.7 Permits required for importation. (a... Federal Import Milk Act, the importation into the United States of milk and cream is prohibited unless the...

  3. 19 CFR 12.7 - Permits required for importation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Department of Health and Human Services under the said act require that each container of milk or cream... THE TREASURY SPECIAL CLASSES OF MERCHANDISE Milk and Cream § 12.7 Permits required for importation. (a... Federal Import Milk Act, the importation into the United States of milk and cream is prohibited unless the...

  4. 36 CFR 14.70 - Statutory authority.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... telephone and telegraph purposes, and for pipe lines, canals, ditches, water plants, and other purposes to the extent of the ground occupied by such canals, ditches, water plants, or other works permitted... exercise the use permitted under the Act. (b) The Act of March 4, 1911 (36 Stat. 1253; 43 U.S.C. 961), as...

  5. 36 CFR 14.70 - Statutory authority.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... telephone and telegraph purposes, and for pipe lines, canals, ditches, water plants, and other purposes to the extent of the ground occupied by such canals, ditches, water plants, or other works permitted... exercise the use permitted under the Act. (b) The Act of March 4, 1911 (36 Stat. 1253; 43 U.S.C. 961), as...

  6. 36 CFR 14.70 - Statutory authority.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... telephone and telegraph purposes, and for pipe lines, canals, ditches, water plants, and other purposes to the extent of the ground occupied by such canals, ditches, water plants, or other works permitted... exercise the use permitted under the Act. (b) The Act of March 4, 1911 (36 Stat. 1253; 43 U.S.C. 961), as...

  7. Survey of restaurants regarding smoking policies.

    PubMed

    Williams, Alcia; Peterson, Elizabeth; Knight, Susan; Hiller, Marc; Pelletier, Andrew

    2004-01-01

    The New Hampshire Indoor Smoking Act was implemented in 1994 to protect the public's health by regulating smoking in enclosed places. A survey was conducted of New Hampshire restaurants to determine smoking policies, to determine restaurant characteristics associated with smoking policies, and to evaluate compliance with the Indoor Smoking Act. A list of New Hampshire restaurants was obtained from a marketing firm. Establishments were selected randomly until 400 had completed a 22-question telephone survey. Forty-four percent of restaurants permitted smoking. Characteristics positively associated with permitting smoking were being a non-fast-food restaurant, selling alcohol, selling tobacco, and having greater than the median number of seats. Of restaurants permitting smoking, 96.1% had a designated smoking area, 87.0% had a ventilation system to minimize secondhand smoke, 83.6% had a physical barrier between smoking and nonsmoking areas, and 53.1% exhibited signs marking the smoking area. Forty percent of restaurants permitting smoking met all four requirements of the Indoor Smoking Act. Smoking policies differ, by type of restaurant. Compliance with the Indoor Smoking Act is low.

  8. Title V Operating Permits

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  9. EPA Issued Operating Permits

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  10. 50 CFR 15.23 - Permits for zoological breeding or display programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... OF WILDLIFE AND PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.23 Permits for zoological breeding or display programs. (a) Application requirements for... 50 Wildlife and Fisheries 1 2011-10-01 2011-10-01 false Permits for zoological breeding or display...

  11. 50 CFR 15.23 - Permits for zoological breeding or display programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF WILDLIFE AND PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.23 Permits for zoological breeding or display programs. (a) Application requirements for... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Permits for zoological breeding or display...

  12. 21 CFR 1210.20 - Application for permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.20 Application for permit. Application for a permit to ship or transport milk or cream into the United States shall be made by the actual shipper upon forms...

  13. 21 CFR 1210.20 - Application for permit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.20 Application for permit. Application for a permit to ship or transport milk or cream into the United States shall be made by the actual shipper upon forms...

  14. 40 CFR 52.743 - Continuous monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the right to deem an operating permit not federally enforceable. Such a determination will be made... 28, 1989) and will be based upon either; the permit, permit approval procedures or state or local permit requirements which do not conform with the operating permit program requirements or the...

  15. 21 CFR 1210.26 - Permits for raw milk or cream.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Permits for raw milk or cream. 1210.26 Section... FEDERAL IMPORT MILK ACT Permit Control § 1210.26 Permits for raw milk or cream. Except as provided in § 1210.27, permits to ship or transport raw milk or cream into the United States will be granted only...

  16. 21 CFR 1210.26 - Permits for raw milk or cream.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Permits for raw milk or cream. 1210.26 Section... FEDERAL IMPORT MILK ACT Permit Control § 1210.26 Permits for raw milk or cream. Except as provided in § 1210.27, permits to ship or transport raw milk or cream into the United States will be granted only...

  17. Summary Report of Ecological Risk Assessment for the Operation of the Explosives Waste Treatment Facility at Site 300 of the Lawrence Livermore National Laboratory.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gallegos, Gretchen M.; Terusaki, Stan H.

    2013-12-01

    An ecological risk assessment is required as part of the Resource Recovery and Conservation Act (RCRA) permit renewal process for Miscellaneous Units subject to 22 CCR 66270.23. This risk assessment is prepared in support of the RCRA permit renewal for the Explosives Waste Treatment Facility (EWTF) at Site 300 of the Lawrence Livermore National Laboratory (LLNL). LLNL collected soil samples and used the resulting data to produce a scoping-level ecological risk assessment pursuant to the Department of Toxic Substances Control, Guidance for Ecological Risk Assessment at Hazardous Waste Sites and Permitted Facilities, Part A: Overview, July 4, 1996. The scoping-levelmore » ecological risk assessment provides a framework to determine the potential interaction between ecological receptors and chemicals of concern from hazardous waste treatment operations in the area of EWTF. A scoping-level ecological risk assessment includes the step of conducting soil sampling in the area of the treatment units. The Sampling Plan in Support of the Human Health and Ecological Risk Assessment for the Operation of the Explosives Waste Treatment Facility at Site 300 of the Lawrence Livermore National Laboratory, (Terusaki, 2007), outlines the EWTF project-specific soil sampling requirements. Soil samples were obtained and analyzed for constituents from four chemical groups: furans, explosives, semi-volatiles and metals. Analytical results showed that furans, explosives and semi-volatiles were not detected; therefore, no further analysis was conducted. The soil samples did show the presence of metals. Soil samples analyzed for metals were compared to site-wide background levels, which had been developed for site -wide cleanup activities pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Total metal concentrations from 28 discrete soil samples obtained in the EWTF area were all below CERCLA-developed background levels. Therefore, following DTSC 1996 guidance, the EWTF hazardous waste treatment units exit the ecological risk evaluation process upon completion of the requirements of a scoping-level assessment report. This summary report documents that the requirements of a scoping-level assessment have been met.« less

  18. 75 FR 52038 - Notice of Permit Application Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ... wastes (aerosol cans, paints, solvents, etc.) will be brought ashore. Conditions of the permit would... permit is made by: Ralph Fedor, 2337 Granite View Road, Waite Park, MN 56387. Location: Signy Island...

  19. 30 CFR 922.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Eradication of Noxious Weeds Act, MCL section 247.61; the Michigan Endangered Species Act of 1974, MCL section... must be supplied and negotiate the date by which the information must be submitted; or (iii) Judge the... the information as required by § 912.773(b)(2)(ii) by the specified date, the office may reject the...

  20. 30 CFR 922.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Eradication of Noxious Weeds Act, MCL section 247.61; the Michigan Endangered Species Act of 1974, MCL section... must be supplied and negotiate the date by which the information must be submitted; or (iii) Judge the... the information as required by § 912.773(b)(2)(ii) by the specified date, the office may reject the...

  1. 30 CFR 922.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Eradication of Noxious Weeds Act, MCL section 247.61; the Michigan Endangered Species Act of 1974, MCL section... must be supplied and negotiate the date by which the information must be submitted; or (iii) Judge the... the information as required by § 912.773(b)(2)(ii) by the specified date, the office may reject the...

  2. 30 CFR 922.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Eradication of Noxious Weeds Act, MCL section 247.61; the Michigan Endangered Species Act of 1974, MCL section... must be supplied and negotiate the date by which the information must be submitted; or (iii) Judge the... the information as required by § 912.773(b)(2)(ii) by the specified date, the office may reject the...

  3. 76 FR 20721 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... Conservation Act of 1978 (Pub. L. 95-541) AGENCY: National Science Foundation. ACTION: Notice of permit... physiology of penguins in at least two ways. First, the respiratory oxygen store is estimated to comprise one... volume is a potential mechanism for prevention of pulmonary barotrauma (``lung squeeze''). Yet the...

  4. 76 FR 20721 - Notice of Permit Applications Received Under the Antarctic Conservation Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... Conservation Act AGENCY: National Science Foundation. ACTION: Notice of permit applications received under the... Diego. The volume of the air sacs and lungs are critical to the diving physiology of penguins in at... total body O 2 stores in various species. And second, the ratio of air sac to lung volume is a potential...

  5. 77 FR 20388 - California State Nonroad Engine Pollution Control Standards; Large Spark-Ignition (LSI) Engines...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ...: (1) there is inadequate lead time to permit the development of the necessary technology giving... with section 209(e)(1) of the Clean Air Act, California's LSI regulations must not affect new farming... Act if there is inadequate lead-time to permit the development of technology necessary to meet those...

  6. 30 CFR 784.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.1 Scope. This part... mining operations and reclamation plans portions of applications for permits for underground mining...

  7. 77 FR 25717 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    ... required by section 553 of the Administrative Procedure Act (APA), or any other law, to publish general... entities.'' EPA has concluded that NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or the RFA. Notwithstanding that general permits are...

  8. 21 CFR 1210.23 - Permits granted on certificates.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Permits granted on certificates. 1210.23 Section 1210.23 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.23 Permits granted on certificates. In the discretion of the...

  9. 21 CFR 1210.25 - Permits for pasteurized milk or cream.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Permits for pasteurized milk or cream. 1210.25 Section 1210.25 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES... UNDER THE FEDERAL IMPORT MILK ACT Permit Control § 1210.25 Permits for pasteurized milk or cream...

  10. 21 CFR 1210.23 - Permits granted on certificates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Permits granted on certificates. 1210.23 Section 1210.23 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.23 Permits granted on certificates. In the discretion of the...

  11. 21 CFR 1210.25 - Permits for pasteurized milk or cream.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Permits for pasteurized milk or cream. 1210.25 Section 1210.25 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES... UNDER THE FEDERAL IMPORT MILK ACT Permit Control § 1210.25 Permits for pasteurized milk or cream...

  12. 1989 Environmental monitoring report, Sandia National Laboratories, Albuquerque, New Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hwang, S.; Chavez, G.; Phelan, J.

    1990-05-01

    This 1989 report contains monitoring data from routine radiological and nonradiological environmental surveillance activities. Summaries of significant environmental compliance programs in progress such as National Environmental Policy Act documentation, environmental permits, environmental restoration, and various waste management programs for Sandia National Laboratories in Albuquerque (SNL, Albuquerque) are included. The maximum offsite dose impact was calculated to be 8.8 {times} 10{sup {minus}4} mrem. The total Albuquerque population received a collective dose of 0.097 person-rem during 1989 from SNL, Albuquerque, operations. As in the previous year, SNL, Albuquerque, operations in 1989 had no adverse impact on the general public or on themore » environment. 46 refs., 20 figs., 31 tabs.« less

  13. Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site

    EPA Pesticide Factsheets

    Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.

  14. Title V Operating Permit: XTO Energy, Inc. - Tap 5 Compressor Station

    EPA Pesticide Factsheets

    Initial Title V Operating Permit (Permit Number: V-UO-000018-2007.00) and the Administrative Permit Record for the XTO Energy, Inc., Tap 5 Compressor Station, located on the Uintah and Ouray Indian Reservation.

  15. 78 FR 57180 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ..., Permit Application: 2014-018, Cheeseman's Ecology Safaris, Santa Cruz, CA Activity for Which Permit Is... population structure, migration and demographic processes. Only carcasses that are a sufficient distance away...

  16. 76 FR 77996 - Notice of Issuance of Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC. AGENCY: Environmental... 27, 2011, the EPA issued a final Outer Continental Shelf (OCS) air permit for Eni US Operating Inc. (Eni). This permit became effective on November 28, 2011. In addition, the EPA issued a final...

  17. Lessons from Queensland's last-drinks legislation: The use of extended trading permits.

    PubMed

    Zahnow, Renee; Miller, Peter; Coomber, Kerri; de Andrade, Dominique; Ferris, Jason

    2018-05-01

    The association between alcohol availability, alcohol consumption and, in turn, alcohol-related harms is well established. Policies to reduce alcohol-related harms focus on limiting accessibility through the regulation of the liquor industry, including trading hours. On 1 July 2016, the Queensland Government introduced legislation to reduce ordinary liquor trading hours, replacing 5 am closing times with 3 am cessation of liquor sales in designated entertainment precincts and 2 am cessation of sales across the rest of the state. However, the amendment was under-inclusive and did not apply to temporary extended trading permits, a provision of the Liquor Act 1992 allowing one-off variations in trading hours for special events. We use 24 months of data (1 January 2015 to 31 December 2016) from the Office of Liquor Gaming and Regulation to explore patterns of extended trading permit use across Queensland, pre- and post- 1 July 2016. We find that following the Amendment in 2016 there was also a distinct shift in the utilisation of temporary extended trading permits, with a 63% increase in approved permits between 2015 and 2016. Temporal clustering around key calendar events dissipated following 1 July 2016 with consistent concentration of permit utilisation over consecutive weeks. Using temporary extended trading permits venue owners avoided earlier closing times and continued to operate until 5 am. The findings provide lessons for future policy implementation by illustrating the capacity for under-inclusive legislation to result in the dilution of intended effects. © 2018 Australasian Professional Society on Alcohol and other Drugs.

  18. 30 CFR 784.10 - Information collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.10... requires applicants for permits for underground coal mines to prepare and submit an operation and...

  19. 30 CFR 780.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.1 Scope. This part provides the... operations and reclamation plan portions of applications for permits for surface mining activities, except to...

  20. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    EPA Pesticide Factsheets

    Draft Title V Operating Permit, statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Draft Part 71 Permit for Andeavor Field Services, LLC - Walker Hollow CS.

  1. 40 CFR 52.1233 - Operating permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. Emission limitations and related provisions which are established in Minnesota permits as federally...

  2. 78 FR 69709 - Notice of Permit Modification Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... the required notice of a requested permit modification. DATES: Interested parties are invited to.... Permit applications may be inspected by interested parties at the Permit Office, address below. ADDRESSES... would be mounted on aluminum poles; the poles would be anchored at ground level in a simple rock-basket...

  3. 7 CFR 57.905 - Importation of restricted eggs or eggs containing more restricted eggs than permitted in the...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Importation of restricted eggs or eggs containing more restricted eggs than permitted in the official standards for U.S. Consumer Grade B. 57.905 Section 57.905... AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT (CONTINUED) INSPECTION OF EGGS (EGG...

  4. 77 FR 14579 - Self-Regulatory Organizations; NYSE Amex LLC; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... Reserve Floor Market Maker Amex Trading Permits (``Reserve ATPs''). The text of the proposed rule change... Reserve ATPs. Under the current Fee Schedule, an ATP Holder \\3\\ acting as a Market Maker must pay $5,000 per month per Amex Trading Permit (``ATP'').\\4\\ In order to act as a Floor Market Maker, an individual...

  5. 76 FR 68749 - Effluent Limits Under the NPDES General Permit for Oil and Gas Exploration, Development and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    .... SUMMARY: EPA Region 10 today issues a final action for six effluent limits for produced water under the... hydrocarbons (TAH), total aqueous hydrocarbons (TAqH), silver, and whole effluent toxicity (WET), pursuant to the provisions of the Clean Water Act (CWA or ``the Act''), 33 U.S.C. 1251. The Permit continues to...

  6. 7 CFR 57.905 - Importation of restricted eggs or eggs containing more restricted eggs than permitted in the...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Importation of restricted eggs or eggs containing more restricted eggs than permitted in the official standards for U.S. Consumer Grade B. 57.905 Section 57.905... AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT (CONTINUED) INSPECTION OF EGGS (EGG...

  7. 75 FR 65483 - Proposed Reissuance of General NPDES Permits (GP) for Alaskan Medium-Size Suction Dredging...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... proposed rule'' for which the agency ``is required by section 553 of the Administrative Procedure Act (APA... permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or...

  8. 78 FR 20316 - Final Issuance of General NPDES Permits (GP) for Small Suction Dredges in Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ... Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA exempts... permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or...

  9. Canyon Day Sand and Gravel Wash Process Plant: Draft NPDES Permit AZ0024511

    EPA Pesticide Factsheets

    EPA is issuing a notice of proposed action under the Clean Water Act to issue NPDES Permit No.permit renewal (No. AZ0024511) to White Mountain Apache Tribe Canyon Day Sand and Gravel Wash Process Plant, Greer, Arizona.

  10. Paramount Refinery, Paramount, California; Petition to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  11. Petition to Object to Yarnell Mining Company's Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  12. Petition to Object to Edwardsport Generating Station Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  13. 40 CFR 52.1233 - Operating permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. (a) Emission limitations and related provisions which are established in Minnesota permits as federally...

  14. 40 CFR 52.1233 - Operating permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. (a) Emission limitations and related provisions which are established in Minnesota permits as federally...

  15. 40 CFR 52.1233 - Operating permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. (a) Emission limitations and related provisions which are established in Minnesota permits as federally...

  16. 40 CFR 52.1233 - Operating permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. (a) Emission limitations and related provisions which are established in Minnesota permits as federally...

  17. Title V Operating Permit: CR Group, LLC - Tekoi Landfill

    EPA Pesticide Factsheets

    Final First Renewal of the Operating Permit (Permit Number: V-SV-000001-2016.00), Response to Public Comments and the Administrative Permit Record for the CR Group, LLC, Tekoi Landfill, located on the Skull Valley Indian Reservation, in Tooele County, UT.

  18. Title V Operating Permit: XTO Energy, Inc. - Little Canyon Unit Compressor Station

    EPA Pesticide Factsheets

    Initial Title V Operating Permit (Permit Number: V-UO-000016-2006.00), Response to Public Comments and the Administrative Permit Record for the XTO Energy, Inc., Little Canyon Unit Compressor Station, located on the Uintah and Ouray Indian Reservation.

  19. East Kentucky Power Cooperative Spurlock Station; Petition to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  20. Premcor Refining Group, Port Arthur, Texas; Petition to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  1. ConocoPhillips Wilmington Refinery, Wilmington, California; Petiton to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  2. Tradewinds Veneer Mill, Ookala, Hawaii; Petition to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  3. Tradewinds Veneer Mill, Ookala, Hawaii; Petiton to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  4. Tennessee Valley Authority, Paradise Fossil Plant; Petition to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  5. Thoroughbred Generating Company; Supplement to Petition to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  6. Cemex, Inc., Lyons, Colorado; Petition to Object (or reopen) to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  7. Petition to Object to New United Motor Manufacturing, Inc. Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  8. Behavioral Responses Of Fish To A Current-Based Hydrokinetic Turbine Under Mutlipe Operational Conditions: Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grippo, Mark A.; Shen, Haixue; Zydlewski, Gayle

    There is significant interest in the interaction of aquatic organisms with current-based marine and hydrokinetic (MHK) technologies. Determining the potential impacts of MHK devices on fish behavior is critical to addressing the environmental concerns that could act as barriers to the permitting and deployment of MHK devices. To address these concerns, we use field monitoring and fish behavior models to characterize the behavioral responses of fish to MHK turbines and infer potential stimuli that may have elicited the observed behavioral changes.

  9. 47 CFR 13.9 - Eligibility and application for new license or endorsement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS Radio Operator's... Radiotelephone Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar...

  10. 47 CFR 13.9 - Eligibility and application for new license or endorsement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS Radio Operator's... Radiotelephone Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar...

  11. 77 FR 123 - Final Reissuance of General NPDES Permits (GP) for Facilities Related to Oil and Gas Extraction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA... NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking...

  12. 78 FR 17661 - Proposed Reissuance of a General NPDES Permit for Oil and Gas Exploration Facilities in the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA... NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking...

  13. 40 CFR 223.3 - Preliminary determination; notice.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....3 Section 223.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Procedures for Revision, Revocation or Limitation of Ocean Dumping Permits Under Section 104(d...

  14. 40 CFR 223.3 - Preliminary determination; notice.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....3 Section 223.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Procedures for Revision, Revocation or Limitation of Ocean Dumping Permits Under Section 104(d...

  15. 40 CFR 223.3 - Preliminary determination; notice.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....3 Section 223.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Procedures for Revision, Revocation or Limitation of Ocean Dumping Permits Under Section 104(d...

  16. 40 CFR 223.3 - Preliminary determination; notice.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....3 Section 223.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Procedures for Revision, Revocation or Limitation of Ocean Dumping Permits Under Section 104(d...

  17. 40 CFR 220.3 - Categories of permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 220.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING GENERAL..., and research permits for ocean dumping under section 102 of the Act. (a) General permits. General... impact and are generally disposed of in small quantities, or for specific classes of materials that must...

  18. 40 CFR 220.3 - Categories of permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 220.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING GENERAL..., and research permits for ocean dumping under section 102 of the Act. (a) General permits. General... impact and are generally disposed of in small quantities, or for specific classes of materials that must...

  19. 40 CFR 223.3 - Preliminary determination; notice.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....3 Section 223.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Procedures for Revision, Revocation or Limitation of Ocean Dumping Permits Under Section 104(d...

  20. 75 FR 67347 - Marine Mammals; File No. 14326

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ...(s): Permits, Conservation and Education Division, Office of Protected Resources, NMFS, 1315 East... amended permit allows takes of up to 20 adult female Steller sea lions annually by capture using... the ESA. Dated: October 27, 2010. Tammy C. Adams, Acting Chief, Permits, Conservation and Education...

  1. ConocoPhillips Wilmington Refinery, Wilmington, California; 2008 Petiton to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  2. Georgia Power Company, Wansley Steam Electric Generating Plant; Petition to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  3. Wisconsin Public Service, Weston Generating Station; Petition to Object to Issuance of Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  4. Thoroughbred Generating Company, Muhlenberg County, Kentucky; Order Denying Petition For Objection To Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  5. Tennessee Valley Authority, Paradise Fossil Plant; Order Responding Petition to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  6. 40 CFR 52.1834 - Minor source permit to operate program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Minor source permit to operate program. 52.1834 Section 52.1834 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Minor source permit to operate program. Emission limitations and related provisions, which, in...

  7. 40 CFR 52.1834 - Minor source permit to operate program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Minor source permit to operate program. 52.1834 Section 52.1834 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Minor source permit to operate program. Emission limitations and related provisions, which, in...

  8. 40 CFR 52.1834 - Minor source permit to operate program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Minor source permit to operate program. 52.1834 Section 52.1834 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Minor source permit to operate program. Emission limitations and related provisions, which, in...

  9. 75 FR 4745 - Approval and Promulgation of Implementation Plans, State of California, San Joaquin Valley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ...Under section 110(k)(6) of the Clean Air Act, EPA is proposing to correct our May 2004 final approval of revisions to the San Joaquin Valley Unified Air Pollution Control District portion of the California State Implementation Plan. EPA is also proposing to take action on three amended District rules, one of which was submitted on March 7, 2008 and the other two of which were submitted on March 17, 2009. Two of the submitted rules reflect revisions to approved District rules that provide for review of new and modified stationary sources (``new source review'' or NSR) within the District, and the third reflects revisions to an approved District rule that provides a mechanism by which existing stationary sources may be exempt from the requirement to secure a Federally-mandated operating permit. The NSR rule revisions relate to exemptions from permitting and from offsets for certain agricultural operations, to the establishment of NSR applicability and offset thresholds consistent with a classification of ``extreme'' nonattainment for the ozone standard, and to the implementation of EPA's NSR Reform Rules. With respect to the revised District NSR rules, EPA is proposing a limited approval and limited disapproval because, although the changes would strengthen the SIP, there are deficiencies in enforceability that prevent full approval. With respect to the operating permit rule, EPA is proposing a full approval. Lastly, EPA is proposing to rescind certain obsolete permitting requirements from the District portion of the California plan. If EPA were to finalize the limited approval and limited disapproval action, as proposed, then a sanctions clock, and EPA's obligation to promulgate a Federal implementation plan, would be triggered because certain revisions to the District rules that are the subject of this action are required under anti-backsliding principles established for the transition from the 1-hour to the 8-hour ozone standard.

  10. 76 FR 55799 - Approval of Clean Air Act Prevention of Significant Deterioration Permit Issued to Avenal Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Deterioration (PSD) permit application submitted by Avenal Power Center, LLC to authorize construction of the Avenal Energy Project. DATES: The EPA's PSD permit for the Avenal Energy Project became effective and...: The EPA issued a PSD permit on May 27, 2011, to Avenal Power Center, LLC for the Avenal Energy Project...

  11. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and Recovery Act, 42 U.S.C. 3251, et seq A.R.S. Title 49, sections 921-932. (4) National Environmental.... Section 9-461 to 9-462.01); County planning and zoning statutes (A.R.S. Sections 11-322 et seq., 11-803... adequate for OSM to comply with the National Environmental Policy Act, 42 U.S.C. 4322. If necessary, WSC...

  12. 76 FR 57979 - Intent to Prepare an Environmental Impact Statement (EIS) for a Permit Application for Widening...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    ... (Port) application for a Department of the Army permit under Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act of 1899, and Section 103 of the Marine Protection, Research, and..., to the existing depth of -42 feet mean lower low water, as well as the beneficial use and placement...

  13. 40 CFR 22.44 - Supplemental rules of practice governing the termination of permits under section 402(a) of the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Supplemental rules of practice governing the termination of permits under section 402(a) of the Clean Water Act or under section 3008(a)(3) of the Resource Conservation and Recovery Act. 22.44 Section 22.44 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL CONSOLIDATED...

  14. 43 CFR 2932.57 - Prohibited acts and penalties.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) PERMITS FOR RECREATION ON PUBLIC LANDS Special Recreation Permits for Commercial Use, Competitive Events, Organized Groups, and Recreation Use in... stipulations or conditions of a permit issued under this subpart; (3) Knowingly participate in an event or...

  15. 17 CFR 255.4 - Permitted underwriting and market making-related activities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... market making-related activities. 255.4 Section 255.4 Commodity and Securities Exchanges SECURITIES AND... FUNDS Proprietary Trading § 255.4 Permitted underwriting and market making-related activities. (a... the banking entity is acting as underwriter. (b) Market making-related activities—(1) Permitted market...

  16. 75 FR 53351 - Notice of Permit Application Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... adjacent to a 100m x 2000m blue-ice runway. The blue-ice runway is a natural feature that requires limited..., Suite 2, Salt Lake City, Utah 84107. Permit application No. 2011 WM-002. Nadene G. Kennedy, Permit...

  17. Entergy Louisiana, Little Gypsy Solid Fuel Repowering Project; Petition to Object to the Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  18. 30 CFR 773.4 - Requirements to obtain permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... a State, no person shall engage in or carry out any surface coal mining operations, unless such... (b) of this section. A permittee need not renew the permit if no surface coal mining operations will...

  19. 30 CFR 773.4 - Requirements to obtain permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... a State, no person shall engage in or carry out any surface coal mining operations, unless such... (b) of this section. A permittee need not renew the permit if no surface coal mining operations will...

  20. 30 CFR 773.4 - Requirements to obtain permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... a State, no person shall engage in or carry out any surface coal mining operations, unless such... (b) of this section. A permittee need not renew the permit if no surface coal mining operations will...

Top