Science.gov

Sample records for action agencies bonneville

  1. Action, agency and responsibility.

    PubMed

    Frith, Chris D

    2014-03-01

    In a series of experiments Marc Jeannerod revealed that we have very little awareness of the details and causes of our actions. We are, however, vividly aware of being in control of our actions and this gives us a sense of responsibility. These feelings arise, first, from intentional binding which creates a perception of agency, linking an intentional action to its outcome and, second, from the counterfactual reasoning that we could have chosen some other action. These feelings of responsibility play a critical role in creating social cohesion since they allow people to be held to account for deliberate antisocial behaviour. Jeannerod's studies also showed that we are unaware of how little we know about our actions and so are happy to make up stories about the nature and causes of our behaviour. These stories often do not correspond with the underlying cognitive and neural processes, but they can be changed through instructions and through discussion with others. Our experience of responsibility for action emerges during our upbringing through exposure to our culture. This creates consensus about the causes of behaviour, but not necessarily accuracy. PMID:24036357

  2. 75 FR 60745 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice... contain the policy and establish the procedures that BPA uses in the solicitation, award, and... $30, or without charge at the following Internet address:...

  3. 7 CFR 1794.33 - Agency action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (CONTINUED) ENVIRONMENTAL POLICIES AND PROCEDURES Procedure for Categorical Exclusions § 1794.33 Agency action. RUS may act on an application for financial assistance upon determining, based on the review of documents as set forth in § 1794.32 and such additional information as RUS deems necessary, that the...

  4. 40 CFR 1506.10 - Timing of agency action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 1506.10 Timing of agency action. (a) The Environmental Protection Agency shall publish a notice in the... with the Environmental Protection Agency, the minimum thirty (30) day period and the minimum ninety (90... periods. The Environmental Protection Agency may upon a showing by the lead agency of compelling......

  5. 40 CFR 1506.10 - Timing of agency action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 1506.10 Timing of agency action. (a) The Environmental Protection Agency shall publish a notice in the... with the Environmental Protection Agency, the minimum thirty (30) day period and the minimum ninety (90... periods. The Environmental Protection Agency may upon a showing by the lead agency of compelling......

  6. 40 CFR 1506.10 - Timing of agency action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... § 1506.10 Timing of agency action. (a) The Environmental Protection Agency shall publish a notice in the... with the Environmental Protection Agency, the minimum thirty (30) day period and the minimum ninety (90... periods. The Environmental Protection Agency may upon a showing by the lead agency of compelling......

  7. 40 CFR 1506.10 - Timing of agency action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 1506.10 Timing of agency action. (a) The Environmental Protection Agency shall publish a notice in the... with the Environmental Protection Agency, the minimum thirty (30) day period and the minimum ninety (90... periods. The Environmental Protection Agency may upon a showing by the lead agency of compelling......

  8. 5 CFR 250.103 - Consequences of improper agency actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Consequences of improper agency actions. 250.103 Section 250.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies §...

  9. 5 CFR 250.103 - Consequences of improper agency actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Consequences of improper agency actions. 250.103 Section 250.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies §...

  10. 5 CFR 250.103 - Consequences of improper agency actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Consequences of improper agency actions. 250.103 Section 250.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies §...

  11. 5 CFR 250.103 - Consequences of improper agency actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Consequences of improper agency actions. 250.103 Section 250.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies §...

  12. 5 CFR 250.103 - Consequences of improper agency actions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Consequences of improper agency actions. 250.103 Section 250.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies §...

  13. British Chinese Children: Agency and Action

    ERIC Educational Resources Information Center

    Clayton, Carmen Lau

    2013-01-01

    The assumption that Chinese young people are passive beings with little or no agency is a dominant theme within the academic literature. However PhD research findings demonstrate how British Chinese adolescents (aged 11-14) do exhibit varying degrees of agency in their lives. Here, agency is understood as individuals having the capacity to act, to…

  14. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  15. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  16. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  17. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  18. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  19. 5 CFR 300.705 - Agency action following statement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Agency action following statement. 300.705 Section 300.705 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EMPLOYMENT (GENERAL) Statutory Bar to Appointment of Persons Who Fail To Register Under Selective Service Law § 300.705 Agency action...

  20. Agency alters perceptual decisions about action-outcomes.

    PubMed

    Desantis, Andrea; Waszak, Florian; Gorea, Andrei

    2016-10-01

    Humans experience themselves as agents, capable of controlling their actions and the outcomes they generate (i.e., the sense of agency). Inferences of agency are not infallible. Research shows that we often attribute outcomes to our agency even though they are caused by another agent. Moreover, agents report the sensory events they generate to be less intense compared to the events that are generated externally. These effects have been assessed using highly suprathreshold stimuli and subjective measurements. Consequently, it remains unclear whether experiencing oneself as an agent lead to a decision criterion change and/or a sensitivity change. Here, we investigate this issue. Participants were told that their key presses generated an upward dot motion but that on 30 % of the trials the computer would take over and display a downward motion. The upward/downward dot motion was presented at participant's discrimination threshold. Participants were asked to indicate whether they (upward motion) or the computer (downward motion) generated the motion. This group of participants was compared with a 'no-agency' group who performed the same task except that subjects did not execute any actions to generate the dot motion. We observed that the agency group reported seeing more frequently the motion they expected to generate (i.e., upward motion) than the no-agency group. This suggests that agency distorts our experience of (allegedly) caused events by altering perceptual decision processes, so that, in ambiguous contexts, externally generated events are experienced as the outcomes of one's actions.

  1. Agency alters perceptual decisions about action-outcomes.

    PubMed

    Desantis, Andrea; Waszak, Florian; Gorea, Andrei

    2016-10-01

    Humans experience themselves as agents, capable of controlling their actions and the outcomes they generate (i.e., the sense of agency). Inferences of agency are not infallible. Research shows that we often attribute outcomes to our agency even though they are caused by another agent. Moreover, agents report the sensory events they generate to be less intense compared to the events that are generated externally. These effects have been assessed using highly suprathreshold stimuli and subjective measurements. Consequently, it remains unclear whether experiencing oneself as an agent lead to a decision criterion change and/or a sensitivity change. Here, we investigate this issue. Participants were told that their key presses generated an upward dot motion but that on 30 % of the trials the computer would take over and display a downward motion. The upward/downward dot motion was presented at participant's discrimination threshold. Participants were asked to indicate whether they (upward motion) or the computer (downward motion) generated the motion. This group of participants was compared with a 'no-agency' group who performed the same task except that subjects did not execute any actions to generate the dot motion. We observed that the agency group reported seeing more frequently the motion they expected to generate (i.e., upward motion) than the no-agency group. This suggests that agency distorts our experience of (allegedly) caused events by altering perceptual decision processes, so that, in ambiguous contexts, externally generated events are experienced as the outcomes of one's actions. PMID:27278083

  2. 7 CFR 245.10 - Action by local educational agencies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS DETERMINING ELIGIBILITY FOR FREE AND REDUCED PRICE MEALS AND FREE MILK IN SCHOOLS § 245.10 Action by local educational agencies. (a) Each local educational agencyof a school desiring to participate in the National School Lunch Program, School Breakfast...

  3. 7 CFR 245.10 - Action by local educational agencies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS DETERMINING ELIGIBILITY FOR FREE AND REDUCED PRICE MEALS AND FREE MILK IN SCHOOLS § 245.10 Action by local educational agencies. (a) Each local educational agencyof a school desiring to participate in the National School Lunch Program, School Breakfast...

  4. 7 CFR 245.10 - Action by local educational agencies.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS DETERMINING ELIGIBILITY FOR FREE AND REDUCED PRICE MEALS AND FREE MILK IN SCHOOLS § 245.10 Action by local educational agencies. (a) Each local educational agencyof a school desiring to participate in the National School Lunch Program, School Breakfast...

  5. 7 CFR 245.10 - Action by local educational agencies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS DETERMINING ELIGIBILITY FOR FREE AND REDUCED PRICE MEALS AND FREE MILK IN SCHOOLS § 245.10 Action by local educational agencies. (a) Each local educational agencyof a school desiring to participate in the National School Lunch Program, School Breakfast...

  6. 7 CFR 245.10 - Action by local educational agencies.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS DETERMINING ELIGIBILITY FOR FREE AND REDUCED PRICE MEALS AND FREE MILK IN SCHOOLS § 245.10 Action by local educational agencies. (a) Each local educational agencyof a school desiring to participate in the National School Lunch Program, School Breakfast...

  7. 5 CFR 300.705 - Agency action following statement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Agency action following statement. 300.705 Section 300.705 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EMPLOYMENT (GENERAL) Statutory Bar to Appointment of Persons Who Fail To Register Under Selective Service...

  8. 5 CFR 300.705 - Agency action following statement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Agency action following statement. 300.705 Section 300.705 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EMPLOYMENT (GENERAL) Statutory Bar to Appointment of Persons Who Fail To Register Under Selective Service...

  9. Spirit Spies 'Bonneville'

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This mosaic image from the panoramic camera on the Mars Exploration Rover Spirit shows the area in front of the rover after its record 27.5 meters (90.2 feet) drive on Sol 43, which ended February 16, 2004. Spirit is looking toward one of its future targets, the rim of a crater nicknamed 'Bonneville.'

  10. Norms, Action and Agency in Multi-agent Systems

    NASA Astrophysics Data System (ADS)

    Sergot, Marek

    This presentation has two parts. The technical part concerns the logic of expressions of the form 'agent x brings it about that A', or 'agent x is responsible for its being the case that A', or more generally, 'the group of agents G collectively, though perhaps inadvertently, bring it about that A'. I will present an account that combines this agency view of action with the transition based conceptions more usually encountered in computer science and temporal logic. A two-sorted (modal) language is defined for talking about properties of states and transitions in a transition system, and about the actions of individual agents or groups of agents, including two modalities of the 'brings it about' kind. Since no assumptions at all are made about the reasoning or perceptual capabilities of the agents - they can be human, or computer agents, or simple reactive devices - I refer to this form of agency as 'unwitting'; unwitting can mean both inadvertent and unaware. The resulting logic bears a resemblance to Ingmar Pörn's (1977) logic of 'brings it about' though there are differences, The account generalises naturally to talking about the collective actions of groups of agents: several different forms of (unwitting) collective agency can be identified.

  11. 22 CFR 208.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Do Federal agencies coordinate suspension and debarment actions? 208.620 Section 208.620 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT... Actions § 208.620 Do Federal agencies coordinate suspension and debarment actions? Yes, when more than...

  12. 75 FR 32835 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial... judicial review of the Federal agency actions on the highway project will be barred unless the claim...

  13. 36 CFR 907.16 - Actions where lead Agency designation is necessary.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Actions where lead Agency... DEVELOPMENT CORPORATION ENVIRONMENTAL QUALITY § 907.16 Actions where lead Agency designation is necessary. (a... proximity, the Corporation will seek designation as lead agency for those actions that directly relate...

  14. 36 CFR 907.16 - Actions where lead Agency designation is necessary.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true Actions where lead Agency... DEVELOPMENT CORPORATION ENVIRONMENTAL QUALITY § 907.16 Actions where lead Agency designation is necessary. (a... proximity, the Corporation will seek designation as lead agency for those actions that directly relate...

  15. 36 CFR 907.16 - Actions where lead Agency designation is necessary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Actions where lead Agency... DEVELOPMENT CORPORATION ENVIRONMENTAL QUALITY § 907.16 Actions where lead Agency designation is necessary. (a... proximity, the Corporation will seek designation as lead agency for those actions that directly relate...

  16. 36 CFR 907.16 - Actions where lead Agency designation is necessary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Actions where lead Agency... DEVELOPMENT CORPORATION ENVIRONMENTAL QUALITY § 907.16 Actions where lead Agency designation is necessary. (a... proximity, the Corporation will seek designation as lead agency for those actions that directly relate...

  17. 36 CFR 907.16 - Actions where lead Agency designation is necessary.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false Actions where lead Agency... DEVELOPMENT CORPORATION ENVIRONMENTAL QUALITY § 907.16 Actions where lead Agency designation is necessary. (a... proximity, the Corporation will seek designation as lead agency for those actions that directly relate...

  18. Bonneville Power Administration 1991 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-01-01

    Congress enacted the Bonneville Project Act in 1937, creating the Bonneville Power Administration to market and transmit the power produced by Bonneville Dam on the Columbia River. Since then, Congress has directed BPA to sell at wholesale the power produced at a total of 30 Federal dams in the Pacific Northwest, and to acquire conservation and generating resources sufficient to meet the needs of BPA`s customer utilities. The dams and the electrical system are known as the Federal Columbia River Power System. Bonneville sells wholesale power to public and private utilities, rural cooperatives, large industries, and Federal agencies. BPA also sells or exchanges power with utilities in California. BPA uses revenues from the sale of power and transmission services to recover its own expenses, to repay the Federal investment in the power system, and to pay for the resources it has acquired. BPA pays for operation and maintenance expenses at the Federal dams and at non-Federal power plants. It also pays for irrigation benefits of Federal projects allocated to power to repay, and for fish and wildlife projects which offset damage to these resources by the Federal hydropower system. This document is the 1991 statement of budget, financial statement, cash flows, capitalization, expenses, and projects. An organization chart is included.

  19. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  20. The Sense of Agency during Continuous Action: Performance Is More Important than Action-Feedback Association

    PubMed Central

    Wen, Wen; Yamashita, Atsushi; Asama, Hajime

    2015-01-01

    The sense of agency refers to the feeling that one is controlling events through one’s own behavior. This study examined how task performance and the delay of events influence one’s sense of agency during continuous action accompanied by a goal. The participants were instructed to direct a moving dot into a square as quickly as possible by pressing the left and right keys on a keyboard to control the direction in which the dot traveled. The interval between the key press and response of the dot (i.e., direction change) was manipulated to vary task difficulty. Moreover, in the assisted condition, the computer ignored participants’ erroneous commands, resulting in improved task performance but a weaker association between the participants’ commands and actual movements of the dot relative to the condition in which all of the participants’ commands were executed (i.e., self-control condition). The results showed that participants’ sense of agency increased with better performance in the assisted condition relative to the self-control condition, even though a large proportion of their commands were not executed. We concluded that, when the action-feedback association was uncertain, cognitive inference was more dominant relative to the process of comparing predicted and perceived information in the judgment of agency. PMID:25893992

  1. 29 CFR 98.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Do Federal agencies coordinate suspension and debarment actions? 98.620 Section 98.620 Labor Office of the Secretary of Labor GOVERNMENTWIDE DEBARMENT AND... Federal agencies coordinate suspension and debarment actions? Yes, when more than one Federal agency...

  2. 2 CFR 2424.1135 - Do Federal agencies coordinate limited denial of participation actions?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Do Federal agencies coordinate limited... SUSPENSION Limited Denial of Participation § 2424.1135 Do Federal agencies coordinate limited denial of participation actions? Federal agencies do not coordinate limited denial of participation actions. As stated...

  3. 7 CFR 3017.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Do Federal agencies coordinate suspension and debarment actions? 3017.620 Section 3017.620 Agriculture Regulations of the Department of Agriculture... Federal agencies coordinate suspension and debarment actions? Yes, when more than one Federal agency...

  4. 36 CFR 1010.16 - Actions to encourage agency cooperation early in the NEPA process.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... respect to any environmental issue that should be addressed in the analysis may be a cooperating agency... TRUST ENVIRONMENTAL QUALITY § 1010.16 Actions to encourage agency cooperation early in the NEPA process. Consistent with 40 CFR 1501.6, the Trust may request the NPS to be a cooperating agency for actions...

  5. 36 CFR 1010.16 - Actions to encourage agency cooperation early in the NEPA process.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... respect to any environmental issue that should be addressed in the analysis may be a cooperating agency... TRUST ENVIRONMENTAL QUALITY § 1010.16 Actions to encourage agency cooperation early in the NEPA process. Consistent with 40 CFR 1501.6, the Trust may request the NPS to be a cooperating agency for actions...

  6. 36 CFR 1010.16 - Actions to encourage agency cooperation early in the NEPA process.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... respect to any environmental issue that should be addressed in the analysis may be a cooperating agency... TRUST ENVIRONMENTAL QUALITY § 1010.16 Actions to encourage agency cooperation early in the NEPA process. Consistent with 40 CFR 1501.6, the Trust may request the NPS to be a cooperating agency for actions...

  7. 36 CFR 1010.16 - Actions to encourage agency cooperation early in the NEPA process.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... respect to any environmental issue that should be addressed in the analysis may be a cooperating agency... TRUST ENVIRONMENTAL QUALITY § 1010.16 Actions to encourage agency cooperation early in the NEPA process. Consistent with 40 CFR 1501.6, the Trust may request the NPS to be a cooperating agency for actions...

  8. 36 CFR 1010.15 - Actions where lead agency designation is necessary.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL QUALITY § 1010.15 Actions where lead agency designation is necessary. (a) Consistent with 40 CFR... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Actions where lead agency... functional interdependence or geographical proximity, the Trust will seek designation as lead agency...

  9. 36 CFR 1010.15 - Actions where lead agency designation is necessary.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL QUALITY § 1010.15 Actions where lead agency designation is necessary. (a) Consistent with 40 CFR... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false Actions where lead agency... functional interdependence or geographical proximity, the Trust will seek designation as lead agency...

  10. 36 CFR 1010.15 - Actions where lead agency designation is necessary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL QUALITY § 1010.15 Actions where lead agency designation is necessary. (a) Consistent with 40 CFR... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Actions where lead agency... functional interdependence or geographical proximity, the Trust will seek designation as lead agency...

  11. 36 CFR 1010.15 - Actions where lead agency designation is necessary.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL QUALITY § 1010.15 Actions where lead agency designation is necessary. (a) Consistent with 40 CFR... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true Actions where lead agency... functional interdependence or geographical proximity, the Trust will seek designation as lead agency...

  12. 36 CFR 1010.15 - Actions where lead agency designation is necessary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL QUALITY § 1010.15 Actions where lead agency designation is necessary. (a) Consistent with 40 CFR... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Actions where lead agency... functional interdependence or geographical proximity, the Trust will seek designation as lead agency...

  13. The Road to 'Bonneville'

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This false-color panoramic camera composite traverse map depicts the Mars Exploration Rover Spirit's journey since landing at Gusev Crater, Mars. It was generated from three of the camera's different wavelength filters (750 nanometers, 530 nanometers and 480 nanometers). This map was created on the 65th martian day, or sol, of Spirit's mission, after Spirit had traveled 328 meters (1076 feet) from its lander to the rim of the crater dubbed 'Bonneville.' From this high point, Spirit was able to capture with its panoramic camera the entire rover traverse. The map points out major stops that Spirit made along the way, including features nicknamed 'Adirondack;' 'Stone Council;' 'Laguna Hollow;' and 'Humphrey.' Also highlighted is the landscape feature informally named 'Grissom Hill' and Spirit's landing site, the Columbia Memorial Station.

  14. 75 FR 29601 - Notice of Final Federal Agency Actions on a Proposed Highway Project in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ...(1)(1). This action relates to an approval of a proposed highway project corridor. DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(1)(1). A claim... agency actions by issuing approvals for the Placer Parkway Corridor Preservation Project--Tier 1 in...

  15. 21 CFR 1404.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Do Federal agencies coordinate suspension and debarment actions? 1404.620 Section 1404.620 Food and Drugs OFFICE OF NATIONAL DRUG CONTROL POLICY... Actions § 1404.620 Do Federal agencies coordinate suspension and debarment actions? Yes, when more...

  16. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Administration on December 16, 2011 (76 FR 78332). This notice applies to all Federal agency decisions, actions... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Light Rail Project in... meaning of 23 U.S.C. 139(l)(1). The actions relate to the East Link Light Rail Transit Project in...

  17. Bonneville Power Administration 1997 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  18. 31 CFR 19.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Do Federal agencies coordinate suspension and debarment actions? 19.620 Section 19.620 Money and Finance: Treasury Office of the Secretary... to Suspension and Debarment Actions § 19.620 Do Federal agencies coordinate suspension and...

  19. 2 CFR 180.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Do Federal agencies coordinate suspension and debarment actions? 180.620 Section 180.620 Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET....620 Do Federal agencies coordinate suspension and debarment actions? Yes, when more than one...

  20. 5 CFR 919.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Do Federal agencies coordinate suspension and debarment actions? 919.620 Section 919.620 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT...) General Principles Relating to Suspension and Debarment Actions § 919.620 Do Federal agencies...

  1. 22 CFR 1508.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Do Federal agencies coordinate suspension and debarment actions? 1508.620 Section 1508.620 Foreign Relations AFRICAN DEVELOPMENT FOUNDATION GOVERNMENTWIDE... § 1508.620 Do Federal agencies coordinate suspension and debarment actions? Yes, when more than...

  2. 41 CFR 105-68.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Do Federal agencies coordinate suspension and debarment actions? 105-68.620 Section 105-68.620 Public Contracts and Property... coordinate suspension and debarment actions? Yes, when more than one Federal agency has an interest in...

  3. 29 CFR 1471.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Do Federal agencies coordinate suspension and debarment actions? 1471.620 Section 1471.620 Labor Regulations Relating to Labor (Continued) FEDERAL MEDIATION AND... Suspension and Debarment Actions § 1471.620 Do Federal agencies coordinate suspension and debarment...

  4. 22 CFR 1006.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Do Federal agencies coordinate suspension and debarment actions? 1006.620 Section 1006.620 Foreign Relations INTER-AMERICAN FOUNDATION GOVERNMENTWIDE... § 1006.620 Do Federal agencies coordinate suspension and debarment actions? Yes, when more than...

  5. 36 CFR 1010.16 - Actions to encourage agency cooperation early in the NEPA process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... cooperation early in the NEPA process. 1010.16 Section 1010.16 Parks, Forests, and Public Property PRESIDIO TRUST ENVIRONMENTAL QUALITY § 1010.16 Actions to encourage agency cooperation early in the NEPA process. Consistent with 40 CFR 1501.6, the Trust may request the NPS to be a cooperating agency for actions...

  6. 78 FR 40265 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Replacement in... Bridge (Bridge Street over the Mitchell River) Replacement Project in Chatham-Barnstable County... Federal agency actions on the bridge project will be barred unless the claim is filed on or...

  7. 78 FR 24292 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    .... National Park Service, U.S. National Oceanic Atmospheric Administration National Marine Fisheries. SUMMARY... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for...

  8. 77 FR 55896 - Notice of Final Federal Agency Actions on Loop 1 in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ..., Section 401, Section 319) ; Land and Water Conservation Fund (LWCF) ; Safe Drinking Water Act (SDWA) [42 U... Federal Highway Administration Notice of Final Federal Agency Actions on Loop 1 in Texas AGENCY: Federal..., Texas. Those actions grant licenses, permits, and approvals for the project. DATES: By this notice,...

  9. 76 FR 44649 - Notice of Final Federal Agency Actions on Proposed Highway in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... 1899 ; and Land and Water Conservation Fund . 8. Executive Orders: E.O. 11990 Protection of Wetlands; E... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Texas AGENCY... Texas. Those actions grant licenses, permits and approvals for the project. DATES: By this notice,...

  10. 5 CFR 250.101 - Standards and requirements for agency personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... personnel actions. 250.101 Section 250.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies § 250.101... Personnel Management (OPM), the instructions OPM has published in the Guide to Processing Personnel...

  11. 5 CFR 250.101 - Standards and requirements for agency personnel actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... personnel actions. 250.101 Section 250.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies § 250.101... Personnel Management (OPM), the instructions OPM has published in the Guide to Processing Personnel...

  12. 5 CFR 250.101 - Standards and requirements for agency personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... personnel actions. 250.101 Section 250.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies § 250.101... Personnel Management (OPM), the instructions OPM has published in the Guide to Processing Personnel...

  13. 5 CFR 250.101 - Standards and requirements for agency personnel actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... personnel actions. 250.101 Section 250.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies § 250.101... Personnel Management (OPM), the instructions OPM has published in the Guide to Processing Personnel...

  14. 5 CFR 250.101 - Standards and requirements for agency personnel actions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... personnel actions. 250.101 Section 250.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies § 250.101... Personnel Management (OPM), the instructions OPM has published in the Guide to Processing Personnel...

  15. 77 FR 26275 - Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS AGENCY... Sinha, Project Manager, Bonneville Power Administration--TEP-3, P.O. Box 3621, Portland, Oregon 97208... (including wind generators and power marketers) requested the use of BPA's transmission system to...

  16. 5 CFR 300.705 - Agency action following statement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Review, Staffing Operations Division, Career Entry Group, room 6A12, U.S. Office of Personnel Management... OPM. Instead, an agency will provide, for information as part of its certification report to...

  17. 5 CFR 300.705 - Agency action following statement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Review, Staffing Operations Division, Career Entry Group, room 6A12, U.S. Office of Personnel Management... OPM. Instead, an agency will provide, for information as part of its certification report to...

  18. 29 CFR 11.10 - Identification of agency actions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of “major Federal action” (40 CFR 1508.18) and 40 CFR 1507.3(b)(2), the following paragraphs identify..., water or soil quality, plant or animal life, the use of land or other aspects of the human environment... original standard. (iii) Agency legislative requests for appropriations Exempted by 40 CFR 1508.17....

  19. 29 CFR 11.10 - Identification of agency actions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of “major Federal action” (40 CFR 1508.18) and 40 CFR 1507.3(b)(2), the following paragraphs identify..., water or soil quality, plant or animal life, the use of land or other aspects of the human environment... original standard. (iii) Agency legislative requests for appropriations Exempted by 40 CFR 1508.17....

  20. 29 CFR 11.10 - Identification of agency actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of “major Federal action” (40 CFR 1508.18) and 40 CFR 1507.3(b)(2), the following paragraphs identify... original standard. (iii) Agency legislative requests for appropriations Exempted by 40 CFR 1508.17. (iv...) Enforcement proceedings Exempted by 40 CFR 1508.18. (viii) Equipment approvals No possibility of...

  1. Action, agency, and empathy: Schafer on the analyst's dilemma.

    PubMed

    Greenberg, Jay

    2013-01-01

    Throughout his career, a central feature of Roy Schafer's theorizing has been to highlight the role of activity and personal agency in every facet of human experience. This theme has remained at the forefront of Schafer's work, despite being embedded within different frames of reference. In this paper, the author highlights Schafer's focus on activity, notes some clinical problems to which it can give rise, and suggests the way that Schafer has attempted to deal with these difficulties.

  2. Both Motor Prediction and Conceptual Congruency between Preview and Action-Effect Contribute to Explicit Judgment of Agency

    ERIC Educational Resources Information Center

    Sato, Atsushi

    2009-01-01

    The sense of agency is the sense that one is causing an action. The inferential account of the sense of agency proposes that we experience the sense of agency when we infer that one's own thoughts are the cause of an action. According to this account, the inference occurs when a thought appears in consciousness prior to an action, is consistent…

  3. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect

    N /A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  4. A Guide for Training Neighborhood Workers in a Community Action Agency.

    ERIC Educational Resources Information Center

    National Committee on Employment of Youth, New York, NY.

    One of a pair of publications prepared under contract with the Office of Economic Opportunity, this guide is designed to help trainers, administrators, and other Community Action Agency staff prepare themselves and their agencies for the recruitment, selection, training, and supervision of neighborhood workers. Topics covered include developing an…

  5. 7 CFR 245.11 - Action by State agencies and FNSROs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS DETERMINING ELIGIBILITY FOR FREE AND REDUCED PRICE MEALS AND FREE MILK IN SCHOOLS § 245.11 Action by State agencies and FNSROs. (a) Each State agency, or FNSRO... FNSRO, as applicable, shall issue a prototype free and reduced price policy statement and any...

  6. 7 CFR 245.11 - Action by State agencies and FNSROs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS DETERMINING ELIGIBILITY FOR FREE AND REDUCED PRICE MEALS AND FREE MILK IN SCHOOLS § 245.11 Action by State agencies and FNSROs. (a) Each State agency, or FNSRO... FNSRO, as applicable, shall issue a prototype free and reduced price policy statement and any...

  7. 7 CFR 245.11 - Action by State agencies and FNSROs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS DETERMINING ELIGIBILITY FOR FREE AND REDUCED PRICE MEALS AND FREE MILK IN SCHOOLS § 245.11 Action by State agencies and FNSROs. (a) Each State agency, or FNSRO... FNSRO, as applicable, shall issue a prototype free and reduced price policy statement and any...

  8. 7 CFR 245.11 - Action by State agencies and FNSROs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS DETERMINING ELIGIBILITY FOR FREE AND REDUCED PRICE MEALS AND FREE MILK IN SCHOOLS § 245.11 Action by State agencies and FNSROs. (a) Each State agency, or FNSRO... FNSRO, as applicable, shall issue a prototype free and reduced price policy statement and any...

  9. 7 CFR 245.11 - Action by State agencies and FNSROs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS DETERMINING ELIGIBILITY FOR FREE AND REDUCED PRICE MEALS AND FREE MILK IN SCHOOLS § 245.11 Action by State agencies and FNSROs. (a) Each State agency, or FNSRO... FNSRO, as applicable, shall issue a prototype free and reduced price policy statement and any...

  10. The sense of agency is action-effect causality perception based on cross-modal grouping.

    PubMed

    Kawabe, Takahiro; Roseboom, Warrick; Nishida, Shin'ya

    2013-07-22

    Sense of agency, the experience of controlling external events through one's actions, stems from contiguity between action- and effect-related signals. Here we show that human observers link their action- and effect-related signals using a computational principle common to cross-modal sensory grouping. We first report that the detection of a delay between tactile and visual stimuli is enhanced when both stimuli are synchronized with separate auditory stimuli (experiment 1). This occurs because the synchronized auditory stimuli hinder the potential grouping between tactile and visual stimuli. We subsequently demonstrate an analogous effect on observers' key press as an action and a sensory event. This change is associated with a modulation in sense of agency; namely, sense of agency, as evaluated by apparent compressions of action-effect intervals (intentional binding) or subjective causality ratings, is impaired when both participant's action and its putative visual effect events are synchronized with auditory tones (experiments 2 and 3). Moreover, a similar role of action-effect grouping in determining sense of agency is demonstrated when the additional signal is presented in the modality identical to an effect event (experiment 4). These results are consistent with the view that sense of agency is the result of general processes of causal perception and that cross-modal grouping plays a central role in these processes.

  11. 77 FR 6622 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Replacement in... within the meaning of 23 U.S.C. 139(l)(1). The action relates to the proposed Whittier Bridge (Interstate... subject to 23 U.S.C. 139(l)(1) by issuing approval for the following bridge/highway improvement project...

  12. 77 FR 1782 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Replacement in... within the meaning of 23 U.S.C. 39(l)(1). The action relates to the proposed Fore River Bridge (State... bridge project in the Commonwealth of Massachusetts. The project proposes to replace the...

  13. 5 CFR 230.401 - Agency authority to take personnel actions in a national emergency disaster.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... actions in a national emergency disaster. 230.401 Section 230.401 Administrative Personnel OFFICE OF... personnel actions in a national emergency disaster. (a) Upon an attack on the United States, agencies are... organizations during a period of disaster without regard to any regulation or instruction of OPM, except...

  14. 5 CFR 230.401 - Agency authority to take personnel actions in a national emergency disaster.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... actions in a national emergency disaster. 230.401 Section 230.401 Administrative Personnel OFFICE OF... personnel actions in a national emergency disaster. (a) Upon an attack on the United States, agencies are... organizations during a period of disaster without regard to any regulation or instruction of OPM, except...

  15. 5 CFR 230.401 - Agency authority to take personnel actions in a national emergency disaster.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... actions in a national emergency disaster. 230.401 Section 230.401 Administrative Personnel OFFICE OF... personnel actions in a national emergency disaster. (a) Upon an attack on the United States, agencies are... organizations during a period of disaster without regard to any regulation or instruction of OPM, except...

  16. 5 CFR 230.401 - Agency authority to take personnel actions in a national emergency disaster.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... actions in a national emergency disaster. 230.401 Section 230.401 Administrative Personnel OFFICE OF... personnel actions in a national emergency disaster. (a) Upon an attack on the United States, agencies are... organizations during a period of disaster without regard to any regulation or instruction of OPM, except...

  17. 77 FR 59035 - Notice of Final Federal Agency Action on Proposed Bridge Rehabilitation and Restoration in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... Restoration in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitations... Longfellow Bridge Rehabilitation and Restoration Project in Boston and Cambridge, Massachusetts. The action... rehabilitation and restoration of the Longfellow Bridge over the Charles River. It also includes the...

  18. 76 FR 55459 - Notice of Final Federal Agency Actions on Proposed Highway in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... Lake Washington by replacing the SR 520 Portage Bay and Evergreen Point bridges and improve existing... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Washington... County, Washington. These actions grant approval of the project. DATES: By this notice, the FHWA...

  19. 76 FR 2949 - Notice of Final Federal Agency Actions on Proposed Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... Construction Project in the State of Washington. Those actions grant approval for the project. DATES: By this... Construction Project. The project includes constructing pontoons sufficient to replace the existing traffic... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Project in...

  20. 78 FR 77477 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Action on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... SECURITY Coast Guard Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Action on the Interstate 5 Bridge across the Columbia River AGENCY: Coast Guard, DHS. ACTION: Notice of limitation on claims for judicial review. SUMMARY: This notice announces the Coast Guard's final action...

  1. The joint Simon effect depends on perceived agency, but not intentionality, of the alternative action

    PubMed Central

    Stenzel, Anna; Dolk, Thomas; Colzato, Lorenza S.; Sellaro, Roberta; Hommel, Bernhard; Liepelt, Roman

    2014-01-01

    A co-actor's intentionality has been suggested to be a key modulating factor for joint action effects like the joint Simon effect (JSE). However, in previous studies intentionality has often been confounded with agency defined as perceiving the initiator of an action as being the causal source of the action. The aim of the present study was to disentangle the role of agency and intentionality as modulating factors of the JSE. In Experiment 1, participants performed a joint go/nogo Simon task next to a co-actor who either intentionally controlled a response button with own finger movements (agency+/intentionality+) or who passively placed the hand on a response button that moved up and down on its own as triggered by computer signals (agency−/intentionality−). In Experiment 2, we included a condition in which participants believed that the co-actor intentionally controlled the response button with a Brain-Computer Interface (BCI) while placing the response finger clearly besides the response button, so that the causal relationship between agent and action effect was perceptually disrupted (agency−/intentionality+). As a control condition, the response button was computer controlled while the co-actor placed the response finger besides the response button (agency−/intentionality−). Experiment 1 showed that the JSE is present with an intentional co-actor and causality between co-actor and action effect, but absent with an unintentional co-actor and a lack of causality between co-actor and action effect. Experiment 2 showed that the JSE is absent with an intentional co-actor, but no causality between co-actor and action effect. Our findings indicate an important role of the co-actor's agency for the JSE. They also suggest that the attribution of agency has a strong perceptual basis. PMID:25140144

  2. I control therefore I do: judgments of agency influence action selection.

    PubMed

    Karsh, N; Eitam, B

    2015-05-01

    Our sense of being agents, that is of willingly controlling both our own bodies and the external environment is ubiquitous if thin. Empirical and theoretical work on this 'sense of agency' has documented motivational, cognitive and neural influences on implicit (out of awareness) and explicit (conscious) judgments of agency. For example, fluency of action selection processes has been recently shown to affect judgments of one's degree of control over an external event. However, it is an open question whether and how such judgments of agency act as input to other processes. In this study we demonstrate that the opposite relationship between action selection and judgment of agency also exists. Specifically, we show that manipulating one's objective control over the environment influences both the speed and the frequency of performing an action associated with that control. This pattern bears a striking resemblance to the effect that tangible rewards have on action selection and suggests that positive control feedback is rewarding to the organism, consequently affecting action selection. If further corroborated this 'reward from control' may explain everyday addictions such as prolonged engagement in arcade games and pathological behaviors, such as stereotypy. PMID:25724007

  3. 41 CFR 302-1.101 - What actions are agencies expected to take concerning the comprehensive, automated relocation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... agencies expected to take concerning the comprehensive, automated relocation management system? 302-1.101... What actions are agencies expected to take concerning the comprehensive, automated relocation..., automated relocation management system....

  4. 41 CFR 302-1.101 - What actions are agencies expected to take concerning the comprehensive, automated relocation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... agencies expected to take concerning the comprehensive, automated relocation management system? 302-1.101... What actions are agencies expected to take concerning the comprehensive, automated relocation..., automated relocation management system....

  5. 41 CFR 302-1.101 - What actions are agencies expected to take concerning the comprehensive, automated relocation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... agencies expected to take concerning the comprehensive, automated relocation management system? 302-1.101... What actions are agencies expected to take concerning the comprehensive, automated relocation..., automated relocation management system....

  6. Action-effect binding is decreased in motor conversion disorder: implications for sense of agency.

    PubMed

    Kranick, Sarah M; Moore, James W; Yusuf, Nadia; Martinez, Valeria T; LaFaver, Kathrin; Edwards, Mark J; Mehta, Arpan R; Collins, Phoebe; Harrison, Neil A; Haggard, Patrick; Hallett, Mark; Voon, Valerie

    2013-07-01

    The abnormal movements seen in motor conversion disorder are affected by distraction and entrainment, similar to voluntary movement. Unlike voluntary movement, however, patients lack a sense of control for the abnormal movements, a failure of "self-agency." The action-effect binding paradigm has been used to quantify the sense of self-agency, because subjective contraction of time between an action and its effect only occurs if the patient feels that they are the agent responsible for the action. We used this paradigm, coupled with emotional stimuli, to investigate the sense of agency with voluntary movements in patients with motor conversion disorder. Twenty patients with motor conversion disorder and 20 age-matched and sex-matched healthy volunteers used a rotating clock to judge the time of their own voluntary key presses (action) and a subsequent auditory tone (effect) after they completed conditioning blocks in which high, medium, and low tones were coupled to images of happy, fearful, and neutral faces. The results replicated those produced previously: it was reported that an effect after a voluntary action occurred earlier, and the preceding action occurred later, compared with trials that used only key presses or tones. Patients had reduced overall binding scores relative to healthy volunteers, suggesting a reduced sense of agency. There was no effect of the emotional stimuli (faces) or other interaction effects. Healthy volunteers with subclinical depressive symptoms had higher overall binding scores. We demonstrate that patients with motor conversion disorder have decreased action-effect binding for normal voluntary movements compared with healthy volunteers, consistent with the greater experience of lack of control.

  7. 34 CFR 85.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... procedures for coordinating their suspension and debarment actions. Authority: E.O. 12549 (3 CFR, 1986 Comp., p. 189); E.O 12689 (3 CFR, 1989 Comp., p. 235); 20 U.S.C. 1082, 1094, 1221e-3 and 3474; and Sec... 34 Education 1 2010-07-01 2010-07-01 false Do Federal agencies coordinate suspension and...

  8. The Community Action Agency and Educational Authority: A Theoretical Analysis of Inter-Organizational Politics.

    ERIC Educational Resources Information Center

    Sturge, Harry H.; Bloland, Harland

    Attention is drawn to the programs funded under the Elementary and Secondary Education Act of 1965, defining this law as a basic attempt to change the interrelationships of social groups in America. This paper presents as a case study the relationships between a community action agency (CAA), on the one hand, and the local school districts (LEAs)…

  9. 77 FR 37953 - Final Federal Agency Actions on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ... Agency Actions on Proposed Bridge in Massachusetts'' in the Federal Register at 77 FR 1782. The proposed..., Cambridge, MA 02142, 617-494-2419, dsantiago@dot.gov . For Massachusetts Department of Transportation....S.C. 139(l)(1). Issued on: June 14, 2012. Pamela S. Stephenson, Division Administrator,...

  10. Urban High School Students' Critical Science Agency: Conceptual Understandings and Environmental Actions around Climate Change

    ERIC Educational Resources Information Center

    McNeill, Katherine L.; Vaughn, Meredith Houle

    2012-01-01

    This study investigates how the enactment of a climate change curriculum supports students' development of critical science agency, which includes students developing deep understandings of science concepts and the ability to take action at the individual and community levels. We examined the impact of a four to six week urban ecology curriculum…

  11. 21 CFR 25.60 - Environmental effects abroad of major agency actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 1 2011-04-01 2011-04-01 false Environmental effects abroad of major agency actions. 25.60 Section 25.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ENVIRONMENTAL IMPACT CONSIDERATIONS Other Requirements § 25.60 Environmental...

  12. 21 CFR 25.60 - Environmental effects abroad of major agency actions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 1 2013-04-01 2013-04-01 false Environmental effects abroad of major agency actions. 25.60 Section 25.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ENVIRONMENTAL IMPACT CONSIDERATIONS Other Requirements § 25.60 Environmental...

  13. 76 FR 77301 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... third lane in both directions on US 18/151 from the CTH PD interchange to the Raymond Road intersection... regional traffic by constructing a depressed freeway down the center of Verona Road. A US 151/18 system... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway Project...

  14. 78 FR 70093 - Notice of Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... final agency action relates to a proposed highway project, Bonner Bridge Replacement Project along NC 12...) identifies the Bridge within the Existing NC 12 Easement Alternative as the selected alternative for Phase IIa of the Bonner Bridge Replacement Project. DATES: By this notice, the FHWA is advising the...

  15. 5 CFR 2606.202 - OGE or other agency action on requests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... PROCEDURES PRIVACY ACT RULES Access to Records and Accounting of Disclosures § 2606.202 OGE or other agency action on requests. A response to a request for access should include the following: (a) A statement that there is a record or records as requested or a statement that there is not a record in the system...

  16. 5 CFR 2606.202 - OGE or other agency action on requests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... PROCEDURES PRIVACY ACT RULES Access to Records and Accounting of Disclosures § 2606.202 OGE or other agency action on requests. A response to a request for access should include the following: (a) A statement that there is a record or records as requested or a statement that there is not a record in the system...

  17. 5 CFR 731.203 - Suitability actions by OPM and other agencies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... based on an objection to an eligible or pass over of a preference eligible under 5 CFR 332.406, is not a... agencies. 731.203 Section 731.203 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) SUITABILITY Suitability Determinations and Actions § 731.203...

  18. 75 FR 59787 - Notice of Final Federal Agency Actions on Proposed Highway in New Hampshire

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-28

    .... 11593 Protection and Enhancement of Cultural Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287... Agency Actions on the Proposed Highway in New Hampshire'' in the Federal Register at 72 FR 30047-01 for... downloaded from the project Web site at http://www.rebuildingi93.com/ . This notice applies to all FHWA...

  19. 78 FR 17702 - Agency Information Collection Activities: Application for Action on an Approved Application or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... SECURITY U.S. Citizenship and Immigration Services Agency Information Collection Activities: Application... Collection ACTION: 60-Day Notice. SUMMARY: The Department of Homeland Security (DHS), U.S. Citizenship and... Coordination Division, Office of Policy and Strategy, U.S. Citizenship and Immigration Services, Department...

  20. 5 CFR 315.803 - Agency action during probationary period (general).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Agency action during probationary period (general). 315.803 Section 315.803 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CAREER AND CAREER-CONDITIONAL EMPLOYMENT Probation on Initial Appoinment to a Competitive...

  1. 5 CFR 315.803 - Agency action during probationary period (general).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Agency action during probationary period (general). 315.803 Section 315.803 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CAREER AND CAREER-CONDITIONAL EMPLOYMENT Probation on Initial Appoinment to a Competitive...

  2. 5 CFR 315.803 - Agency action during probationary period (general).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Agency action during probationary period (general). 315.803 Section 315.803 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CAREER AND CAREER-CONDITIONAL EMPLOYMENT Probation on Initial Appoinment to a Competitive...

  3. Toward a Psychophysics of Agency: Detecting Gain and Loss of Control over Auditory Action Effects

    ERIC Educational Resources Information Center

    Repp, Bruno H.; Knoblich, Gunther

    2007-01-01

    Theories of agency--the feeling of being in control of one's actions and their effects--emphasize either perceptual or cognitive aspects. This study addresses both aspects simultaneously in a finger-tapping paradigm. The tasks required participants to detect when synchronization of their taps with computer-controlled tones changed to…

  4. 5 CFR 2606.202 - OGE or other agency action on requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... records; (b) The method of access (if a copy of all the records requested is not provided with the... PROCEDURES PRIVACY ACT RULES Access to Records and Accounting of Disclosures § 2606.202 OGE or other agency action on requests. A response to a request for access should include the following: (a) A statement...

  5. 5 CFR 230.401 - Agency authority to take personnel actions in a national emergency disaster.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Agency authority to take personnel actions in a national emergency disaster. 230.401 Section 230.401 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS ORGANIZATION OF THE GOVERNMENT FOR PERSONNEL...

  6. 21 CFR 25.60 - Environmental effects abroad of major agency actions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 1 2014-04-01 2014-04-01 false Environmental effects abroad of major agency actions. 25.60 Section 25.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... subject to the exemptions, exclusions, and modification in contents, timing, and availability of...

  7. 21 CFR 25.60 - Environmental effects abroad of major agency actions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 1 2012-04-01 2012-04-01 false Environmental effects abroad of major agency actions. 25.60 Section 25.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... subject to the exemptions, exclusions, and modification in contents, timing, and availability of...

  8. 76 FR 1492 - Notice of Final Federal Agency Actions on Proposed Highway in Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ....O. 13112, Invasive Species. (Catalog of Federal Domestic Assistance Program Number 20.205, Highway... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Minnesota... Highway 56 near the City of Dodge Center, Dodge County, Minnesota. The proposed improvements...

  9. 76 FR 2948 - Notice of Final Federal Agency Actions on Proposed Highway in Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ...; E.O. 11514, Protection and Enhancement of Environmental Quality; E.O. 13112, Invasive Species... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Minnesota... Wing County) to the County Road 2/42 intersection in Pine River (Cass County), Minnesota. Those...

  10. 76 FR 2947 - Notice of Final Federal Agency Actions on Proposed Highway in Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ...; E.O. 11514, Protection and Enhancement of Environmental Quality; E.O. 13112, Invasive Species... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Minnesota... Willmar, Minnesota in Kandlyohi County. The proposed improvements include grade-separated interchanges...

  11. 5 CFR 315.803 - Agency action during probationary period (general).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Agency action during probationary period (general). 315.803 Section 315.803 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CAREER AND CAREER-CONDITIONAL EMPLOYMENT Probation on Initial Appoinment to a Competitive...

  12. 5 CFR 315.803 - Agency action during probationary period (general).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Agency action during probationary period (general). 315.803 Section 315.803 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CAREER AND CAREER-CONDITIONAL EMPLOYMENT Probation on Initial Appoinment to a Competitive...

  13. Collaborative agency to support integrated care for children, young people and families: an action research study

    PubMed Central

    Stuart, Kaz

    2014-01-01

    Abstract Introduction Collaboration was legislated in the delivery of integrated care in the early 2000s in the UK. This research explored how the reality of practice met the rhetoric of collaboration. Theory The paper is situated against a theoretical framework of structure, agency, identity and empowerment. Collectively and contextually these concepts inform the proposed model of ‘collaborative agency’ to sustain integrated care. The paper brings sociological theory on structure and agency to the dilemma of collaboration. Methods Participative action research was carried out in collaborative teams that aspired to achieve integrated care for children, young people and families between 2009 and 2013. It was a part time, PhD study in collaborative practice. Results The research established that people needed to be able to be jointly aware of their context, to make joint decisions, and jointly act in order to deliver integrated services, and proposes a model of collaborative agency derived from practitioner’s experiences and integrated action research and literature on agency. The model reflects the effects of a range of structures in shaping professional identity, empowerment, and agency in a dynamic. The author proposes that the collaborative agency model will support integrated care, although this is, as yet, an untested hypothesis. PMID:24868192

  14. Audit of Bonneville Power Administration`s management of Information Resources

    SciTech Connect

    1996-04-02

    Bonneville Power Administration`s (Bonneville) information resources include computer-related equipment, spare parts, and computer software. The objective of this audit was to determine whether Bonneville acquired and accounted for computer-related equipment properly. We found positive aspects in Bonneville`s management of computer-related equipment. However, improvements could be made in implementing credit card and property procedures. Specifically, we found that improvements were needed to (1) control credit card purchases, (2) ensure that equipment was tagged and included in property records, (3) maintain accountability over spare parts, and (4) identify unused equipment. As a result, about $90,000 of equipment was bought by personnel whose authority to purchase was not properly documented, and about $182,000 of purchases lacked supporting invoices. In addition, one maintenance support group had over $109,000 of spare parts shortages. Furthermore, Bonneville could have saved about $803,000 had unused equipment been redistributed within Bonneville or to other Federal and state agencies. Management concurred with the recommendations to improve internal controls.

  15. Corrective Action Decision Document, Area 15 Environmental Protection Agency Farm Laboratory Building, Corrective Action Unit No. 95, Revision 0

    SciTech Connect

    1997-08-18

    This report is the Corrective Action Decision Document (CADD) for the Nevada Test Site (NTS) Area 15 U.S. Environmental Protection Agency (EPA) Farm, Laboratory Building (Corrective Action Unit [CAU] No. 95), at the Nevada Test Site, Nye County, Nevada. The scope of this CADD is to identify and evaluate potential corrective action alternatives for the decommissioning and decontamination (D and D) of the Laboratory Building, which were selected based on the results of investigative activities. Based on this evaluation, a preferred corrective action alternative is recommended. Studies were conducted at the EPA Farm from 1963 to 1981 to determine the animal intake and retention of radionuclides. The main building, the Laboratory Building, has approximately 370 square meters (4,000 square feet) of operational space. Other CAUS at the EPA Farm facility that will be investigated and/or remediated through other environmental restoration subprojects are not included in this CADD, with the exception of housekeeping sites. Associated structures that do not require classification as CAUS are considered in the evaluation of corrective action alternatives for CAU 95.

  16. 33. photographer unknown 15 October 1936 PANORAMA OF BONNEVILLE PROJECT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. photographer unknown 15 October 1936 PANORAMA OF BONNEVILLE PROJECT WITH LOCK AND ORIGINAL POWERHOUSE NEARLY COMPLETE AND SPILLWAY UNDER CONSTRUCTION. - Bonneville Project, Columbia River, 1 mile Northeast of Exit 40, off Interstate 84, Bonneville, Multnomah County, OR

  17. Action sounds update the mental representation of arm dimension: contributions of kinaesthesia and agency

    PubMed Central

    Tajadura-Jiménez, Ana; Tsakiris, Manos; Marquardt, Torsten; Bianchi-Berthouze, Nadia

    2015-01-01

    Auditory feedback accompanies almost all our actions, but its contribution to body-representation is understudied. Recently it has been shown that the auditory distance of action sounds recalibrates perceived tactile distances on one’s arm, suggesting that action sounds can change the mental representation of arm length. However, the question remains open of what factors play a role in this recalibration. In this study we investigate two of these factors, kinaesthesia, and sense of agency. Across two experiments, we asked participants to tap with their arm on a surface while extending their arm. We manipulated the tapping sounds to originate at double the distance to the tapping locations, as well as their synchrony to the action, which is known to affect feelings of agency over the sounds. Kinaesthetic cues were manipulated by having additional conditions in which participants did not displace their arm but kept tapping either close (Experiment 1) or far (Experiment 2) from their body torso. Results show that both the feelings of agency over the action sounds and kinaesthetic cues signaling arm displacement when displacement of the sound source occurs are necessary to observe changes in perceived tactile distance on the arm. In particular, these cues resulted in the perceived tactile distances on the arm being felt smaller, as compared to distances on a reference location. Moreover, our results provide the first evidence of consciously perceived changes in arm-representation evoked by action sounds and suggest that the observed changes in perceived tactile distance relate to experienced arm elongation. We discuss the observed effects in the context of forward internal models of sensorimotor integration. Our results add to these models by showing that predictions related to action sounds must fit with kinaesthetic cues in order for auditory inputs to change body-representation. PMID:26074843

  18. 76 FR 54288 - Notice of Final Federal Agency Actions on Proposed Bridge and Approach Roadways in Nevada and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Bridge and Approach... proposed Laughlin-Bullhead City Bridge project in Laughlin, Clark County, Nevada; and in Bullhead City... claim seeking judicial review of the Federal agency actions on the bridge and roadway project will...

  19. 75 FR 53735 - Notice of Final Federal Agency Actions on East Lake Sammamish Master Plan Trail in King County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on East Lake Sammamish Master Plan Trail in King County, WA AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice...

  20. 12 CFR 192.205 - May a court review the appropriate Federal banking agency's final action on my conversion?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 1 2012-01-01 2012-01-01 false May a court review the appropriate Federal banking agency's final action on my conversion? 192.205 Section 192.205 Banks and Banking COMPTROLLER OF... banking agency's final action on my conversion? (a) Any person aggrieved by the appropriate...

  1. 12 CFR 192.205 - May a court review the appropriate Federal banking agency's final action on my conversion?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 1 2014-01-01 2014-01-01 false May a court review the appropriate Federal banking agency's final action on my conversion? 192.205 Section 192.205 Banks and Banking COMPTROLLER OF... banking agency's final action on my conversion? (a) Any person aggrieved by the appropriate...

  2. 12 CFR 192.205 - May a court review the appropriate Federal banking agency's final action on my conversion?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 1 2013-01-01 2013-01-01 false May a court review the appropriate Federal banking agency's final action on my conversion? 192.205 Section 192.205 Banks and Banking COMPTROLLER OF... banking agency's final action on my conversion? (a) Any person aggrieved by the appropriate...

  3. 41 CFR 102-75.1145 - What action must the Federal agency receiving an offer of a conditional gift take?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal agency receiving an offer of a conditional gift take? 102-75.1145 Section 102-75.1145 Public... the Defense Effort § 102-75.1145 What action must the Federal agency receiving an offer of a... Federal agency must acknowledge receipt of the offer in writing and advise the donor that the offer...

  4. 41 CFR 102-75.515 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... educational or public health requirement? 102-75.515 Section 102-75.515 Public Contracts and Property... Health Purposes § 102-75.515 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for an educational or public health requirement? When...

  5. 41 CFR 102-75.515 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... educational or public health requirement? 102-75.515 Section 102-75.515 Public Contracts and Property... Health Purposes § 102-75.515 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for an educational or public health requirement? When...

  6. Bonneville Power Administration 1993 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-01-01

    For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

  7. Bonneville, Power Administration Timing System

    NASA Technical Reports Server (NTRS)

    Martin, Kenneth E.

    1996-01-01

    Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

  8. Environmental audit, Bonneville Power Administration, lower Columbia area

    SciTech Connect

    Not Available

    1990-11-01

    This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

  9. 77 FR 15096 - Bonneville Power Administration; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... Energy Regulatory Commission Bonneville Power Administration; Notice of Compliance Filing Take notice that on March 6, 2012, the Bonneville Power Administration (Bonneville) submitted a compliance filing.... Bonneville Power Admin., 137 FERC ] 61,185 (2011) (``Order''). Any person desiring to intervene or to...

  10. Doing good or bad: How interactions between action and emotion expectations shape the sense of agency.

    PubMed

    Gentsch, Antje; Weiss, Carmen; Spengler, Stephanie; Synofzik, Matthis; Schütz-Bosbach, Simone

    2015-08-01

    The emotional consequences of our own and others' actions can influence our agentive self-awareness in social contexts. Positive outcomes are usually linked to the self and used for self-enhancement, whereas negative outcomes are more often attributed to others. In most situations, these causal attribution tendencies seem to be immediately present instead of involving reflective interpretations of the action experience. To address the question at which level of the cognitive hierarchy emotions and action perception interact, we adopted a social reward anticipation paradigm. Here, participants or their interaction partner received positive or negative action outcomes and performed speeded attribution choices regarding causation of the action outcome. Event-Related Potential (ERP) results showed that the emotional value of an outcome already influenced the classical N1 self-attenuation effect, with reduced embodied agentive self-awareness for negative outcomes at initial sensorimotor stages. At the level of the N300, the degree of updating and affective evaluation associated with the respective attributive decision was reflected and particularly associated to attribution tendencies for positive events. Our results show an early interaction between emotion and agency processes, and suggest that self-serving cognition can be grounded in embodied knowledge from low-level sensorimotor mechanisms. PMID:25644692

  11. Redwood Community Action Agency: Technical progress report, 4th quarter, 1986

    SciTech Connect

    Not Available

    1986-01-01

    Redwood Community Action Agency (RCAA) has been developing a business plan for a shared-savings energy business under this grant since January, 1986. At this time RCAA is nearing completion of the research activities, although a 90 day no-cost extension has been requested and received to complete activities on this grant. All consultant reports on the technical feasibility analysis and market research activities have been completed at this time. Fifteen thousand dollars of equity capital has been allocated for the business venture being investigated under this grant through an equity grant from the California Department of Economic Opportunity. This money, combined with agency unrestricted funds, will provide the initial seed capital for the venture.

  12. Redwood Community Action Agency: Technical progress report, 3rd quarter, 1986

    SciTech Connect

    Not Available

    1986-01-01

    Since the second quarter, at which time venture feasibility activities were well underway by Redwood Community Action Agency (RCAA) to develop a shared-savings energy business plan, significant progress has been made. Nearly all consultant reports on the technical feasibility analysis have been completed, initial market research has begun and capitalization strategy has been investigated. Additionally, RCAA received an award of a substantial grant from the California Dept. of Economic Opportunity to develop a series of business ventures with a consortium of Northern California community providers. Fifteen thousand dollars of equity capital has been allocated for the energy-related business venture being investigated under this grant. If all plans go as anticipated, this money, combined with agency unrestricted funds, will provide the initial seed capital for the venture.

  13. 41 CFR 302-1.101 - What actions are agencies expected to take concerning the comprehensive, automated relocation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... expected to take concerning the comprehensive, automated relocation management system? 302-1.101 Section... What actions are agencies expected to take concerning the comprehensive, automated relocation..., automated relocation management system....

  14. 22 CFR 208.635 - May the U.S. Agency for International Development settle a debarment or suspension action?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false May the U.S. Agency for International... INTERNATIONAL DEVELOPMENT GOVERNMENTWIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT) General Principles Relating to Suspension and Debarment Actions § 208.635 May the U.S. Agency for International...

  15. "What Happened to Our Sense of Justice?" Tracing Agency and Critical Engagement in a Youth Participatory Action Research Project

    ERIC Educational Resources Information Center

    Giraldo-García, Regina J.; Galletta, Anne

    2015-01-01

    Tracing the nature of critical engagement and agency among youth in a participatory action research (PAR) collective, the study attends to the manner in which critical engagement and agency developed over time for the youth researchers. The focus of the project was to conduct a survey among ninth grade students concerning their early high school…

  16. 75 FR 43160 - Clean Water Act Section 303(d): Final Agency Action on One Arkansas Total Maximum Daily Load (TMDL)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ... AGENCY Clean Water Act Section 303(d): Final Agency Action on One Arkansas Total Maximum Daily Load (TMDL... Arkansas, under section 303(d) of the Clean Water Act (CWA). This TMDL was completed in response to the.../region6/water/npdes/tmdl/index.htm . FOR FURTHER INFORMATION CONTACT: Diane Smith at (214) 665-2145....

  17. 22 CFR 208.635 - May the U.S. Agency for International Development settle a debarment or suspension action?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false May the U.S. Agency for International... INTERNATIONAL DEVELOPMENT GOVERNMENTWIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT) General Principles Relating to Suspension and Debarment Actions § 208.635 May the U.S. Agency for International...

  18. [Social Cognition and the Sense of Agency in Autism: From Action to Interaction].

    PubMed

    Lafleur, Alexis; Soulières, Isabelle; Forgeot d'Arc, Baudoin

    2016-01-01

    The sense of agency (SoA) refers to the ability for one to detect that she is the cause of an action (Gallagher, 2000). The SoA is linked to motor control but also to self-awareness and could play an important role in social interactions. Autism spectrum disorder (ASD) is characterized by an alteration of social interactions and communication (DSM-5; APA, 2013) and is often seen as a primary deficit of functions specific to social cognition. However, motor control is also altered in ASD. We hypothesize that motor symptoms and social impairments could both arise from the same alteration of SoA. We first introduce theoretical models of implicit and explicit SoA (Synofzik et al., 2008) and present their neurofunctional basis. Then, we assess the clinical expressions of a disrupted SoA in different neuropsychiatric disorders such as schizophrenia. In ASD, the atypical formation of internal models of action during motor acquisition (Haswell et al., 2009) could be at the source of an altered implicit SoA. A lack of fidelity of sensorimotor agency cues (Zalla et al., 2015) could also entail an alteration of explicit SoA. We discuss the main clinical expressions of ASD that may ensue from a disrupted SoA (difficulties in theory of mind and imitation, deficits in motor coordination and praxis, etc.). PMID:27570956

  19. [Social Cognition and the Sense of Agency in Autism: From Action to Interaction].

    PubMed

    Lafleur, Alexis; Soulières, Isabelle; Forgeot d'Arc, Baudoin

    2016-01-01

    The sense of agency (SoA) refers to the ability for one to detect that she is the cause of an action (Gallagher, 2000). The SoA is linked to motor control but also to self-awareness and could play an important role in social interactions. Autism spectrum disorder (ASD) is characterized by an alteration of social interactions and communication (DSM-5; APA, 2013) and is often seen as a primary deficit of functions specific to social cognition. However, motor control is also altered in ASD. We hypothesize that motor symptoms and social impairments could both arise from the same alteration of SoA. We first introduce theoretical models of implicit and explicit SoA (Synofzik et al., 2008) and present their neurofunctional basis. Then, we assess the clinical expressions of a disrupted SoA in different neuropsychiatric disorders such as schizophrenia. In ASD, the atypical formation of internal models of action during motor acquisition (Haswell et al., 2009) could be at the source of an altered implicit SoA. A lack of fidelity of sensorimotor agency cues (Zalla et al., 2015) could also entail an alteration of explicit SoA. We discuss the main clinical expressions of ASD that may ensue from a disrupted SoA (difficulties in theory of mind and imitation, deficits in motor coordination and praxis, etc.).

  20. 78 FR 24794 - Notice of Final Federal Agency Actions on the Proposed Presque Isle Bypass in Aroostook County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Proposed Presque Isle Bypass... Isle Bypass FEIS located in the Town of Presque Isle, Aroostook County, Maine. Those actions grant...: Aroostook County Transportation Study Tier II Presque Isle Bypass Final Environmental Impact Statement...

  1. 76 FR 45649 - Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange Project: Jackson County, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... Federal Highway Administration Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange... the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, I-5: Fern Valley... Administration, 530 Center Street, NE., Suite 420, Salem, Oregon 97301, Telephone: (503) 316-2559. The I-5:...

  2. 78 FR 27473 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... (New NY Bridge) Project in New York, in the Federal Register at FR Doc. 2012-26799. Tappan Zee Hudson... Crossing Project in New York AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of... within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the Tappan Zee Hudson River...

  3. 77 FR 65929 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Crossing Project in New York AGENCY: Federal Highway Administration (FHWA), U.S. DOT. ACTION: Notice of.... Sec. 139(l)(1). The actions relate to the Tappan Zee Hudson River Crossing Project located in Rockland... the following highway project in the State of New York: Tappan Zee Hudson River Crossing...

  4. 78 FR 23630 - Notice of Final Federal Agency Actions on State Highway 99 (Segment C) in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    .... 1251- 1342; Land and Water Conservation Fund (LWCF), 16 U.S.C. 4601-4604. 8. Executive Orders: E.O... Texas AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for...) to SH 288 in Fort Bend and Brazoria Counties, Texas. Those actions grant licenses, permits,...

  5. 76 FR 68810 - Notice of Final Federal Agency Actions on Farm-to-Market 1626 in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ... and Water Resources: Clean Water Act [33 U.S.C. 1251- 1342]; Land and Water Conservation Fund (LWCF... Federal Highway Administration Notice of Final Federal Agency Actions on Farm-to-Market 1626 in Texas... Lane in Hays and Travis Counties, Texas. Those actions grant licenses, permits, and approvals for...

  6. 75 FR 3277 - Notice of Final Federal Agency Actions on State Highway 99 (Segment F-2) in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... Federal Highway Administration Notice of Final Federal Agency Actions on State Highway 99 (Segment F-2) in... actions relate to a proposed highway project, Grand Parkway (State Highway 99) Segment F-2, from State... the following highway project in the State of Texas: Grand Parkway (State Highway 99) Segment F-2...

  7. 12 CFR 192.200 - What actions may the appropriate Federal banking agency take on my application?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 1 2012-01-01 2012-01-01 false What actions may the appropriate Federal banking agency take on my application? 192.200 Section 192.200 Banks and Banking COMPTROLLER OF THE... Review of the Application for Conversion § 192.200 What actions may the appropriate Federal...

  8. 12 CFR 192.200 - What actions may the appropriate Federal banking agency take on my application?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 1 2013-01-01 2013-01-01 false What actions may the appropriate Federal banking agency take on my application? 192.200 Section 192.200 Banks and Banking COMPTROLLER OF THE... Review of the Application for Conversion § 192.200 What actions may the appropriate Federal...

  9. 12 CFR 192.200 - What actions may the appropriate Federal banking agency take on my application?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 1 2014-01-01 2014-01-01 false What actions may the appropriate Federal banking agency take on my application? 192.200 Section 192.200 Banks and Banking COMPTROLLER OF THE... Review of the Application for Conversion § 192.200 What actions may the appropriate Federal...

  10. Explicit Agency in Patients with Cervical Dystonia: Altered Recognition of Temporal Discrepancies between Motor Actions and Their Feedback

    PubMed Central

    Delorme, Cécile; Roze, Emmanuel; Grabli, David; Mayer, Jean-Michel; Degos, Bertrand; Vidailhet, Marie; Worbe, Yulia

    2016-01-01

    Background Abnormalities in the cognitive processing of movement have been demonstrated in patients with dystonia. The sense of agency, which is the experience of initiating and controlling one’s own actions, has never before been studied in these patients. Objectives We investigated whether the sense of agency is altered in patients with cervical dystonia. Methods We used an explicit metacognitive agency task in which participants had to catch targets with a cursor by moving a computer’s mouse. The task included several conditions in which the control over the cursor could be disrupted by adding a spatial or a temporal discrepancy between the mouse and the cursor’s movements. Participants had to acknowledge these discrepancies and reflect them in metacognitive judgements of agency. Results Twenty cervical dystonia patients and 20 matched controls were included in the study. Despite performing equally well as the matched controls, cervical dystonia patients did not fully recognize alterations of agency when a temporal lag was added between their movement and the visual feedback. Moreover, they relied predominantly on their perceived performance to provide judgements of agency and less on their objective degree of controls. There was no correlation between agency scores and clinical severity of dystonia measured by the Toronto Western Spasmodic Torticollis Rating Scale. Conclusion We demonstrated an abnormal processing of agency in cervical dystonia patients, even for motor actions not affected by dystonia. The exact contribution of abnormal agency to dystonia pathophysiology remains to be clarified. PMID:27575487

  11. 76 FR 49763 - Bonneville Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Bonneville Power Administration; Notice of Filing Take notice that on August 1, 2011, the Bonneville Power Administration submitted its Proposed 2012 Wholesale Power...

  12. Bonneville Power Administration 1998 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1998-01-01

    This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

  13. 75 FR 60164 - Notice of Final Federal Agency Actions on Proposed Shared-Use Path in New York State

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Shared-Use Path... relate to a proposed Shared-Use Path Construction Project: PIN 4760.35 Auburn Trail Extension, Town of... of an 8-foot wide Two-Way Shared-Use Path with 2-foot wide graded grass shoulders on either side...

  14. 77 FR 71207 - Notice of Final Federal Agency Actions on Proposed Highway and Bridge in the Cities of Cincinnati...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-29

    ... on November 2, 2012, at 77 FR 66215. That notice provided an incorrect reference to a statute of...: (513) 933-6639. SUPPLEMENTARY INFORMATION: On November 2, 2012, at 77 FR 66215, the FHWA published a... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway and Bridge...

  15. 75 FR 62919 - Notice of Final Federal Agency Actions on the Route 250 Bypass Interchange at McIntire Road...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Route 250 Bypass Interchange... the Route 250 Bypass Interchange at McIntire Road project in the City of Charlottesville, Virginia... approvals for the following project in the State of Virginia: Route 250 Bypass Interchange at McIntire...

  16. 78 FR 59754 - Notice of Final Federal Agency Actions on the Proposed U.S. 50 Study Crossing Over Sinepauxent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on the Proposed U.S. 50 Study Crossing Over Sinepauxent Bay in the Town of Ocean City, Worcester County, Maryland Correction In...

  17. 77 FR 66215 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York Correction In notice document 2012-26799, appearing on page 65929 in the...

  18. 20 CFR 404.1650 - Action we will take if a State agency does not meet the standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Action we will take if a State agency does not meet the standards. 404.1650 Section 404.1650 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE, SURVIVORS AND DISABILITY INSURANCE (1950- ) Determinations of Disability...

  19. 75 FR 25309 - Notice of Final Federal Agency Actions on Proposed Expanded Intermodal Freight Terminal in Michigan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Freight Terminal in Michigan AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of... Yard, also known as the Detroit Intermodal Freight Terminal (DIFT) and associated external-to-terminal... following expansion project in the State of Michigan: Detroit Intermodal Freight Terminal. The...

  20. 77 FR 39795 - Notice of Final Federal Agency Actions on the Interstate 395 High Occupancy (HOV) Vehicle Ramp at...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... Occupancy (HOV) Vehicle Ramp at Seminary Road Project in Virginia AGENCY: Federal Highway Administration...). The actions relate to the Interstate 395 High Occupancy Vehicle (HOV) Ramp at Seminary Road project in... 395 High Occupancy Vehicle (HOV) Ramp at Seminary Road. The project would involve construction of...

  1. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock... a proposed highway project, Sunrise Project, I-205 to Rock Creek Junction, Clackamas County, Oregon..., NE., Suite 100, Salem, Oregon 97301, Telephone: (503) 587-4716. The Sunrise Project, I-205 to...

  2. 43 CFR 1610.5-7 - Situations where action can be taken based on another agency's plan, or a land use analysis.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... on another agency's plan, or a land use analysis. 1610.5-7 Section 1610.5-7 Public Lands: Interior... action can be taken based on another agency's plan, or a land use analysis. These regulations authorize.... The Field Manager may use the plans or the land use analysis of other agencies when split or...

  3. 43 CFR 1610.5-7 - Situations where action can be taken based on another agency's plan, or a land use analysis.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... on another agency's plan, or a land use analysis. 1610.5-7 Section 1610.5-7 Public Lands: Interior... action can be taken based on another agency's plan, or a land use analysis. These regulations authorize.... The Field Manager may use the plans or the land use analysis of other agencies when split or...

  4. 43 CFR 1610.5-7 - Situations where action can be taken based on another agency's plan, or a land use analysis.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... on another agency's plan, or a land use analysis. 1610.5-7 Section 1610.5-7 Public Lands: Interior... action can be taken based on another agency's plan, or a land use analysis. These regulations authorize.... The Field Manager may use the plans or the land use analysis of other agencies when split or...

  5. 43 CFR 1610.5-7 - Situations where action can be taken based on another agency's plan, or a land use analysis.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... on another agency's plan, or a land use analysis. 1610.5-7 Section 1610.5-7 Public Lands: Interior... action can be taken based on another agency's plan, or a land use analysis. These regulations authorize.... The Field Manager may use the plans or the land use analysis of other agencies when split or...

  6. 21 CFR 516.123 - Informal conferences regarding agency administrative actions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Director of the Center for Veterinary Medicine or his or her designee, excluding the Director of the Office... response to that decision. (g) Internal agency review of a decision must be based on the information in the..., the matter will be returned to the appropriate lower level in the agency for reevaluation based on...

  7. 21 CFR 516.123 - Informal conferences regarding agency administrative actions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Director of the Center for Veterinary Medicine or his or her designee, excluding the Director of the Office... response to that decision. (g) Internal agency review of a decision must be based on the information in the..., the matter will be returned to the appropriate lower level in the agency for reevaluation based on...

  8. 7 CFR 246.18 - Administrative review of State agency actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR... review procedures. The State agency must develop procedures for a full administrative review of the... listed in paragraph (a)(1)(ii) of this section, the State agency must develop procedures for...

  9. Bonneville Power Administration 1991 site environmental report

    SciTech Connect

    Not Available

    1992-06-01

    In 1991, in order to provide BPA's management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA's findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  10. Bonneville Power Administration Site Environmental Report, 1991.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-06-01

    In 1991, in order to provide BPA`s management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA`s findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  11. 76 FR 18548 - Clean Water Act Section 303(d): Final Agency Action on Three Total Maximum Daily Loads (TMDLs) in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ...This notice announces final agency action on three TMDLs prepared by EPA Region 6 for waters listed in Louisiana's Mississippi River Basin, under Section 303(d) of the Clean Water Act (CWA). Documents from the administrative record file for the three TMDLs, including TMDL calculations and responses to comments, may be viewed at http://www.epa.gov/region6/water/npdes/tmdl/index.htm. The......

  12. 75 FR 3522 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ...The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed interchange project on U.S. Route 101 at the Monterey/San Benito County line (Monterey County postmiles 100.0/101.3 and San Benito County postmiles 0.0/1.6) in the State of California. Those actions grant......

  13. 12 CFR Appendix A to Part 1002 - Federal Agencies to be Listed in Adverse Action Notices

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., Houston, TX 77010-9050 b. State member banks, branches and agencies of foreign banks (other than Federal... and Outreach (DCCO), 1775 Duke Street, Alexandria, VA 22314. 3. Air carriers: Assistant...

  14. 12 CFR Appendix A to Part 1002 - Federal Agencies to be Listed in Adverse Action Notices

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., Houston, TX 77010-9050 b. State member banks, branches and agencies of foreign banks (other than Federal... and Outreach (DCCO), 1775 Duke Street, Alexandria, VA 22314. 3. Air carriers: Assistant...

  15. 12 CFR Appendix A to Part 1002 - Federal Agencies to be Listed in Adverse Action Notices

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., Houston, TX 77010-9050 b. State member banks, branches and agencies of foreign banks (other than Federal... and Outreach (DCCO), 1775 Duke Street, Alexandria, VA 22314. 3. Air carriers: Assistant...

  16. 75 FR 3782 - Notice of Final Federal Agency Actions on Interstate 84 Highway in Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ...This notice announces actions taken by the FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, I-84 Karcher Interchange to Five Mile Environmental Study, in Boise, Ada and Canyon Counties in the State of Idaho [Idaho Transportation Department (ITD) Key Number...

  17. Bonneville Project: CFD of the Spillway Tailrace

    SciTech Connect

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Romero Gomez, Pedro DJ

    2012-11-19

    US Army Corps of Engineers, Portland District (CENWP) operates the Bonneville Lock and Dam Project on the Columbia River. High spill flows that occurred during 2011 moved a large volume of rock from downstream of the spillway apron to the stilling basin and apron. Although 400 cubic yards of rocks were removed from the stilling basin, there are still large volumes of rock downstream of the apron that could, under certain flow conditions, move upstream into the stilling basin. CENWP is investigating operational changes that could be implemented to minimize future movement of rock into the stilling basin. A key analysis tool to develop these operational changes is a computational fluid dynamics (CFD) model of the spillway. A free-surface CFD model of the Bonneville spillway tailrace was developed and applied for four flow scenarios. These scenarios looked at the impact of flow volume and flow distribution on tailrace hydraulics. The simulation results showed that areas of upstream flow existed near the river bed downstream of the apron, on the apron, and within the stilling basin for all flows. For spill flows of 300 kcfs, the cross-stream and downstream extent of the recirculation zones along Cascade and Bradford Island was very dependent on the spill pattern. The center-loaded pattern had much larger recirculation zones than the flat or bi-modal pattern. The lower flow (200 kcfs) with a flat pattern had a very large recirculation zone that extended half way across the channel near the river bed. A single flow scenario (300 kcfs of flow in a relatively flat spill pattern) was further interrogated using Lagrangian particle tracking. The tracked particles (with size and mass) showed the upstream movement of sediments onto the concrete apron and against the vertical wall between the apron and the stilling basin from seed locations downstream of the apron and on the apron.

  18. 78 FR 58380 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... Floodplain Management; E.O. 12898 Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations. (Catalog of Federal Domestic Assistance Program Number 20.205,...

  19. 77 FR 14464 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ...-94, I-894, and U.S. Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin. Those actions grant.... Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin, Project I.D. 1060-33-01. The project...

  20. 77 FR 6171 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 326... Caltrans assumed, environmental responsibilities for this project pursuant to 23 U.S.C. 326. Notice...

  1. 78 FR 23631 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... to the town of Lakeport on South Main Street and Soda Bay Rd. Those actions grant licenses, permits... Domestic Assistance Program Number 20.205, Highway Planning and Construction. The regulations...

  2. 36 CFR 1236.26 - What actions must agencies take to maintain electronic information systems?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... take to maintain electronic information systems? 1236.26 Section 1236.26 Parks, Forests, and Public... electronic information systems? (a) Agencies must maintain inventories of electronic information systems and... electronic information systems that is adequate to: (1) Specify all technical characteristics necessary...

  3. Agency in Action: How Teachers Interpret and Implement Arizona's 4-Hour Structured English Immersion Program

    ERIC Educational Resources Information Center

    Newcomer, Sarah N.; Collier, Lizabeth C.

    2015-01-01

    Sharing the findings from two qualitative case studies, analyzed together, this article examines various ways educators, both elementary teachers and teacher educators, exercise agency in their interpretation and implementation of Arizona's model of Structured English Immersion (SEI), a 4-hour English Language Development (ELD) block, which…

  4. 19 CFR 210.78 - Notice of enforcement action to Government agencies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... agencies. 210.78 Section 210.78 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS... subpart that results in a permanent or temporary exclusion of articles from entry, or the revocation of an order to such effect, or the issuance of an order compelling seizure and forfeiture of imported articles....

  5. 77 FR 49451 - Agency Information Collection Activities: Consideration of Deferred Action for Childhood Arrivals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-16

    .../Dashboard.do , or call the USCIS National Customer Service Center at 1-800-375-5283. Written comments and... for childhood arrivals: 1. Were under the age of 31 as of June 15, 2012; 2. Came to the United States... SECURITY U.S. Citizenship and Immigration Services Agency Information Collection Activities:...

  6. 77 FR 24255 - Notice of Final Federal Agency Actions on Proposed Highways in Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    .... 11593 Protection and Enhancement of Cultural Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287... and downloaded from the Web sites listed below. This notice applies to all Federal agency decisions on... given by the Federal Transit Administration on September 23, 2010 related to U.S. 36 (75 FR 58017)....

  7. 78 FR 25524 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... Populations; E.O. 11593 Protection and Enhancement of the Cultural Environment; E.O. 13007 Indian Sacred Sites... project Web site at: http://www.dot.ca.gov/dist05/projects/ . This notice applies to all Federal agency... 1979 [16 U.S.C. 470aa et seq.]; and Native American Graves Protection and Repatriation Act . 7....

  8. 78 FR 77696 - Agency Information Collection Activities: Consideration of Deferred Action for Childhood Arrivals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    ... Homeland Security, U.S. Citizenship and Immigration Services (USCIS) published a 60-day Notice of Information Collection in the Federal Register at 78 FR 76636, requesting public comments in connection with... SECURITY U.S. Citizenship and Immigration Services Agency Information Collection Activities:...

  9. Bonneville Power Administration`s Commercial Sector Conservation Market.

    SciTech Connect

    Gordan, Frederick M.

    1992-11-10

    Bonneville has, as part of its resource plan, accepted targets for commercial conservation which are quite ambitious. To meet these targets, Bonneville will need to acquire as much cost-effective conservation as possible over the next twelve years. With this in mind, this document explores the relative importance of different commercial market segments and the types of assistance each market needs to install as many cost-effective conservation measures in as many buildings as possible. This document reviews Bonneville`s marketing environment and position, and suggests goals for commercial sector conservation marketing at Bonneville. Then it presents a broad market segmentation and series of additional demographic analyses. These analyses assess what groups of consumers Bonneville must reach to achieve most of the commercial conservation potential and what is needed to reach them. A final section reviews the success of Bonneville programs at reaching various markets. The market segmentation identifies different types of consumers and opportunities which would require distinct program approaches. Four large market segments are identified that have distinct program needs. Then four ``building life-cycle events`` are identified which provide important conservation opportunities and also require distinct program services. This creates a matrix of 16 cells which delineate distinct needs for program marketing. Each of the four key market segments manages at least 20% of the Region`s commercial floorspace.

  10. 75 FR 8786 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... Office, USFWS, 620 South Walker Street, Bloomington, IN 47403-2121; telephone: 812-334-4261; e- mail... announces actions taken by the FHWA and the USFWS that are final within the meaning of 23 U.S.C. 139(l)(1... subject to 23 U.S.C. 139(l)(1) and are final within the meaning of that law. A claim seeking...

  11. 75 FR 49547 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ..., and the USACE that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to proposed... public that the FHWA, the USACE, and the USFWS have made decisions that are subject to 23 U.S.C. 139(l)(1... Pennsylvania Street, Room 254, Indianapolis, IN 46204-1576; telephone: (317) 226-7486; e-mail:...

  12. 75 FR 59325 - Notice of Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... actions relate to a proposed highway project, the Monroe Connector/Bypass, from US 74 near I-485 in..., North Carolina. The Monroe Connector/Bypass is also known as State Transportation Improvement Program... the following highway project in the State of North Carolina: The Monroe Connector/Bypass, a...

  13. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... actions relate to a proposed highway and transit project within the Tier 1 Elgin O'Hare--West Bypass study... within the Elgin O'Hare--West Bypass study area in Cook and DuPage Counties in Illinois. Decisions in...

  14. 77 FR 75254 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... actions relate to a proposed highway and transit project within the Tier 2 Elgin O'Hare--West Bypass... accommodations; construction of a new toll road between I-90 and I-294 (known as the West Bypass) with two basic lanes in each direction and space reserved on the east side of the north leg of the West Bypass...

  15. Teaching Students to Analyze Agency Actions via a NEPA Analysis Approach

    ERIC Educational Resources Information Center

    Whitworth, Paul M.

    2008-01-01

    Future recreation professionals need the ability to analyze the effects of proposed management actions and stakeholder concerns to make good decisions, maintain public support, and comply with state and federal laws. Importantly, when federal funds, lands, permits or licenses are involved, federal law requires consideration of environmental and…

  16. 76 FR 60583 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ...) et seq.]. 7. Bald and Golden Eagle Protection Act [16 U.S.C. 688-688d]. Previous actions taken by the... affect, but not jeopardize, the bald eagle. The USFWS also concluded that the project was not likely to... Bald Eagle Take Exempted Under ESA permit (No. MB218918-0) for the incidental take of the bald...

  17. 76 FR 37392 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-27

    ... the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, Colton Crossing...-south direction crossing at-grade two Union Pacific Railroad (UPRR) Alhambra/Yuma Subdivision mainline tracks running in an east-west direction. The crossing of these sets of tracks is known as the...

  18. 41 CFR 102-74.160 - What actions must Federal agencies take to promote energy conservation?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.160 What... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What actions...

  19. 41 CFR 102-74.160 - What actions must Federal agencies take to promote energy conservation?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.160 What... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What actions...

  20. 41 CFR 102-74.160 - What actions must Federal agencies take to promote energy conservation?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.160 What... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What actions...

  1. 41 CFR 102-74.160 - What actions must Federal agencies take to promote energy conservation?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.160 What... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What actions...

  2. 41 CFR 102-74.160 - What actions must Federal agencies take to promote energy conservation?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.160 What... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What actions...

  3. Creative Expressions of Agency: Contemplating Youth Voice and Adult Roles in Participatory Action Research

    ERIC Educational Resources Information Center

    Jones, Vanessa; Stewart, Carmine; Galletta, Anne; Ayala, Jennifer

    2015-01-01

    The chapter examines youth participation within three intergenerational collectives using participatory action research (PAR) to address educational policies youth viewed as counterproductive to their education. Outlining the complexity of youth voice, the multiple vehicles within the arts through which youth voice is expressed, and the different…

  4. 75 FR 54420 - Notice of Final Federal Agency Actions on US 290/Hempstead Corridor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    .... 1251- 1342]; Land and Water Conservation Fund (LWCF) . 8. Executive Orders: E.O. 11990 Protection of...) in Harris County, Texas. Those actions grant licenses, permits, and approvals for the project..., District B (South), Federal Highway Administration, 300 East 8th Street, Room 826 Austin, Texas...

  5. 76 FR 61476 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed multi-modal project (Provo-Orem Bus Rapid...: The Provo-Orem Bus Rapid Transit project number F- R399(83). The project has roadway and...

  6. 76 FR 78332 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... Control; 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations; 13112, Invasive Species. (Catalog of Federal Domestic Assistance Program Number 20.205, Highway...; Occupational Safety and Health Act. 4. Social: Uniform Relocation Assistance and Real Property...

  7. Epistemological Agency: A Necessary Action-in-Context Perspective on New Employee Workplace Learning

    ERIC Educational Resources Information Center

    Smith, Ray

    2006-01-01

    This paper discusses research premised on the view that new employees' necessary learning actions may be said to constitute a socio-cultural constructivist epistemology of necessity. It examines the work and learning activities of three new employees during their first months at a wholesale fruit and vegetable company. It proposes that what new…

  8. A Flexible Friend: Action Learning in the Context of a Multi-Agency Organisation Development Programme

    ERIC Educational Resources Information Center

    Edmonstone, John; Flanagan, Hugh

    2007-01-01

    The current profile of action learning in the UK has recently become clearer (Pedler et al., 2005). Using the template of what have been described as "Revans's Classical Principles", fundamental divergences have begun to emerge. Pedler et al. (2005) identified a number of variances from this template--specifically the use of permanent facilitators…

  9. 75 FR 62919 - Notice of Final Federal Agency Actions on Proposed Highway in Vermont

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... local roadways in the project study area. The project includes a section of previously constructed roadway that has never been opened to traffic, new alignment from the end of the previously constructed.... Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 12898, Federal Actions to Address...

  10. 10 CFR Appendix A to Subpart D of... - Categorical Exclusions Applicable to General Agency Actions

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES Typical Classes of Actions Pt. 1021, Subpt. D, App. A Appendix....Interpretations/rulings for existing regulations A5.Rulemaking (interpreting/amending), no change in environmental... change the environmental effect of the rule or regulation being amended. A6Rulemakings that are...

  11. 76 FR 65776 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ...). The actions relate to a proposed highway project, US 41 (Memorial Drive to County M) in Brown County... from Memorial Drive to County M, The project will also reconstruct I-43 from US 41 to Atkinson Drive...-43 via US 41. The project limits on US 41 extend from Memorial Drive to County M, a distance...

  12. 75 FR 75721 - Notice of Final Federal Agency Actions on Proposed Highway in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    .... The project also includes mitigation and restoration actions which are compatible with land use plans... Act, as amended . 3. Land: Section 4(f) of the Department of Transportation Act of 1966 ; Farmland... Water Resources: Clean Water Act (Section 404, Section 401, Section 319) ; Land and Water...

  13. Social Justice in Practice? Exploring Teacher Candidates' Commitment toward Change Agency through Action Research

    ERIC Educational Resources Information Center

    Burrell Storms, Stephanie

    2015-01-01

    Scholars have criticized teacher education programs for using action research (AR) to improve candidates' technical skills rather than promote its emancipatory goals. The author argues candidates who conduct critical AR promote its emancipatory goals and indicate a commitment to act as change agents for social justice through education. This…

  14. 77 FR 66500 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... the City of Riverside, in the counties of Orange and Riverside, State of California. Those actions... to Pierce Street in the City of Riverside. The existing express lanes in Orange County will be extended east from the Orange/County line to Interstate 15 (I-15) in the City of Corona. The existing...

  15. Water resources. Bureau of Reclamation's Bonneville Unit: future repayment arrangements

    SciTech Connect

    Not Available

    1986-03-01

    GAO is convinced that: the Bureau of Reclamation's use of the Water Supply Act of 1958 to defer a portion of municipal and industrial (M and I) costs of the Bonneville Unit was illegal, the Bureau's use of ad valorem (percentage of value) tax revenues from property owners to increase the Bonneville Unit's M and I customers repayment obligation under the 1965 contract was improper, and the Department of Energy Organization Act 1977 requires congressional approval of the modified cost allocation of the Bonneville Unit initiated by the Bureau in 1984.

  16. Using Ensemble Streamflows for Power Marketing at Bonneville Power Administration

    NASA Astrophysics Data System (ADS)

    Barton, S. B.; Koski, P.

    2014-12-01

    Bonneville Power Administration (BPA) is a federal non-profit agency within the Pacific Northwest responsible for marketing the power generated from 31 federal hydro projects throughout the Columbia River Basin. The basin encompasses parts of five states and portions of British Columbia, Canada. BPA works with provincial entities, federal and state agencies, and tribal members to manage the water resources for a variety of purposes including flood risk management, power generation, fisheries, irrigation, recreation, and navigation. This basin is subject to significant hydrologic variability in terms of seasonal volume and runoff shape from year to year which presents new water management challenges each year. The power generation planning group at BPA includes a team of meteorologists and hydrologists responsible for preparing both short-term (up to three weeks) and mid-term (up to 18 months) weather and streamflow forecasts including ensemble streamflow data. Analysts within the mid-term planning group are responsible for running several different hydrologic models used for planning studies. These models rely on these streamflow ensembles as a primary input. The planning studies are run bi-weekly to help determine the amount of energy available, or energy inventory, for forward marketing (selling or purchasing energy up to a year in advance). These studies are run with the objective of meeting the numerous multi-purpose objectives of the basin under the various streamflow conditions within the ensemble set. In addition to ensemble streamflows, an ensemble of seasonal volume forecasts is also provided for the various water conditions in order to set numerous constraints on the system. After meeting all the various requirements of the system, a probabilistic energy inventory is calculated and used for marketing purposes.

  17. 41 CFR 102-75.585 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... eligible public agency has submitted a plan of use for property for a self-help housing or housing assistance requirement? When an eligible public agency submits a plan of use for property for a self-help... disposal agency take after an eligible public agency has submitted a plan of use for property for a...

  18. 41 CFR 102-75.585 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... eligible public agency has submitted a plan of use for property for a self-help housing or housing assistance requirement? When an eligible public agency submits a plan of use for property for a self-help... disposal agency take after an eligible public agency has submitted a plan of use for property for a...

  19. 78 FR 52999 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    .... 139(l)(1). The actions relate to proposed highway projects for a 21 mile segment of I-69 in the... that are subject to 23 U.S.C. 139(l)(1) and are final within the meaning of that law. A claim seeking... 7:30 a.m. to 4 p.m., e.t. For the USFWS: Mr. Scott Pruitt, Field Supervisor, Bloomington...

  20. Explaining the enforcement gap in China: local government support and internal agency obstacles as predictors of enforcement actions in Guangzhou.

    PubMed

    Lo, Carlos Wing-Hung; Fryxell, Gerald E; van Rooij, Benjamin; Wang, Wei; Honying Li, Pansy

    2012-11-30

    This study investigates how local government support for enforcement and internal agency obstacles explain the enforcement gap in Guangzhou, China. It was found that agency obstacles associated with insufficient resources and job ambiguity, in particular, affect enforcement officials' perceptions of enforcement difficulty. Somewhat more surprisingly, however, local government support was not found to be a significant predictor of these perceptions. In addition, this study identified four significant relationships associated with specific enforcement actions. First and second, perceptions of enforcement difficulty appear to lead to fewer inspections, but also have a weak positive effect on the frequency of fines levied. Third, poor coordination within the bureau was found to be associated with fewer violations being processed. Fourth, and contrary to expectations, local government support was found to suppress the frequency of inspections while having no significant effect on violations or fines. Overall, these findings suggest that increased local government support for the enforcement of environmental regulation in China may not necessarily lead to more rigorous enforcement, at least if enforcement rigor is measured in terms of inspections, citations and fines.

  1. Bonneville Unit Clean Hydropower Facilitation Act

    THOMAS, 113th Congress

    Sen. Hatch, Orrin G. [R-UT

    2013-01-22

    06/20/2013 Held at the desk. (All Actions) Notes: For further action, see H.R.254, which became Public Law 113-20 on 7/18/2013. Tracker: This bill has the status Passed SenateHere are the steps for Status of Legislation:

  2. A multi-agency investigation of Heat and human Health relationships in the state of Vermont: Towards actionable science.

    NASA Astrophysics Data System (ADS)

    Oswald, E.

    2015-12-01

    This talk focuses on an assemblage of work conducted primarily between the Vermont State Climate Office and the Vermont Department of Health for better understanding, communicating, and anticipating the impact which elevated air temperatures have, and my have in the future, on public health. This is an example in how several agencies, spanning scientific fields and levels, can all play roles in in producing important understanding and actionable consequences in the face of health risk. This talk starts with an investigation of the relationships between Vermont health statistics and daily maximum air temperature with a focus on the temperatures where the health statistics changed most rapidly with temperature changes, or "changepoints". The results of this investigation suggested that meaningful temperature changepoints exist below 90F. The local WFO considered a day as "hot" when it reached or exceeded 90F unless the day was particularly sunny and humid. Discussions with the local National Weather Service Forecast Office were productive and led to some rethinking of how they consider a "Hot" day. The changepoints information was also incorporated into a health impacts report prepared by the Vermont Department of Health for the CDC's Building Resilience Against Climate Effects, by utilizing climate indices tailored to a temperature less than 90F. This work stands as a demonstration that the co-production of knowledge can produce actionable science.

  3. The Promise of Using Energy Tracking Data to Promote Home-School Connections and Youth Agency in Climate Action

    NASA Astrophysics Data System (ADS)

    Walsh, E.; Jenkins, D.; Cordero, E.

    2015-12-01

    Formal classroom learning experiences that support energy conservation behaviors outside the classroom necessarily must bridge students' home and school lives, as knowledge and practice learned in the classroom is implemented outside of school. To this end, we study the impact of the Green Ninja Energy Tracker curriculum, which uses students' home energy data in the classroom to promote engagement in climate change and conservation behaviors. Data is drawn from class observations, a focus group, and pre- and post- surveys of a pilot implementation of this curriculum in a diverse 12th-grade Earth Science classroom at an alternative school. We investigate what factors contributed to student engagement in learning about and participating in energy conservation behaviors. We found that students were engaged by the immediacy of tracking their energy use in near-real time, and were motivated by the economic benefits experienced as a direct result of changing their behaviors. In addition, students reported discussing and problem-solving energy use with their families, and surfaced considerations that informed which energy behaviors were implemented and why. Students also reported high levels of personal agency in taking action on climate change, but were pessimistic about the likelihood of society as a whole taking action. We suggest that this pilot demonstrates that potential power of connecting students' home and school lives through energy tracker software as a catalyst for developing scientific expertise and engagement, and supporting energy conservation behaviors.

  4. New explorations along the northern shores of Lake Bonneville

    USGS Publications Warehouse

    Oviatt, Charles G.; Miller, D.M.

    1997-01-01

    This field trip begins in Salt Lake City and makes a clockwise circuit of Great Salt Lake, with primary objectives to observe stratigraphie and geomorphic records of Lake Bonneville. Stops include Stansbury Island, Puddle Valley, gravel pits at Lakeside and the south end of the Hogup Mountains, several stops in Curlew Valley and Hansel Valley, and a final stop at the north end of Great Salt Lake east of the Promontory Mountains. Stratigraphie observations at gravel-pit and natural exposures will be linked to interpretations of lake-level change, which were caused by climate change. Evidence of paleoseismic and volcanic activity will be discussed at several sites, and will be tied to the lacustrine stratigraphic record. The trip provides an overview of the history of Lake Bonneville and introduces participants to some new localities with excellent examples of Lake Bonneville landforms and stratigraphy.

  5. Lake-atmosphere feedbacks associated with paleolakes Bonneville and Lahontan

    USGS Publications Warehouse

    Hostetler, S.W.; Giorgi, F.; Bates, G.T.; Bartlein, P.J.

    1994-01-01

    A high-resolution, regional climate model nested within a general circulation model was used to study the interactions between the atmosphere and the large Pleistocene lakes in the Great Basin of the United States. Simulations for January and July 18,000 years ago indicate that moisture provided by synoptic-scale atmospheric circulation features was the primary component of the hydrologic budgets of Lakes Lahontan and Bonneville. In addition, lake-generated precipitation was a substantial component of the hydrologic budget of Lake Bonneville at that time. This local lake-atmosphere interaction may help explain differences in the relative sizes of these lakes 18,000 years ago.

  6. Action!

    ERIC Educational Resources Information Center

    Senese, Joseph

    1998-01-01

    A small group of teachers at one Illinois high school is helping to effect and promote change. Through the Action Research Laboratory (ARL), teams of teachers conduct collaborative action research to improve classroom practices. Data from the first two years of the ARL indicate that teachers are eager to participate in, and have thrived in, their…

  7. Global positioning system applications at the Bonneville Power Administration

    SciTech Connect

    Street, M.A.; Thurein, I.P.; Martin, K.E.

    1995-12-31

    The Bonneville Power Administration (BPA) has used the precise timing feature of the Global Positioning System (GPS) to enhance power system performance and reliability. The BPA Traveling Wave Fault Locator System and the BPA Phasor Measurement System both employ GPS timing.

  8. 32 CFR 552.170 - Camp Bonneville Area Access Office.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 3 2012-07-01 2009-07-01 true Camp Bonneville Area Access Office. 552.170 Section 552.170 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Land Use Policy for Fort...

  9. 32 CFR 552.170 - Camp Bonneville Area Access Office.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Camp Bonneville Area Access Office. 552.170 Section 552.170 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Land Use Policy for Fort...

  10. 32 CFR 552.170 - Camp Bonneville Area Access Office.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 3 2011-07-01 2009-07-01 true Camp Bonneville Area Access Office. 552.170 Section 552.170 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Land Use Policy for Fort...

  11. 32 CFR 552.170 - Camp Bonneville Area Access Office.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 3 2013-07-01 2013-07-01 false Camp Bonneville Area Access Office. 552.170 Section 552.170 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Land Use Policy for Fort...

  12. 32 CFR 552.170 - Camp Bonneville Area Access Office.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 3 2014-07-01 2014-07-01 false Camp Bonneville Area Access Office. 552.170 Section 552.170 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Land Use Policy for Fort Lewis, Yakima Training Center, and...

  13. 28 CFR 58.24 - Procedures for obtaining final agency action on United States Trustees' decisions to deny...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or revoked the agency's license to do business in any jurisdiction; or (5) Any United States district... States Trustee by the agency. The notice shall be sent to the agency by overnight courier, for delivery the next business day. (g) Except as provided in paragraph (i) of this section, the notice...

  14. 28 CFR 58.24 - Procedures for obtaining final agency action on United States Trustees' decisions to deny...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... or revoked the agency's license to do business in any jurisdiction; or (5) Any United States district... States Trustee by the agency. The notice shall be sent to the agency by overnight courier, for delivery the next business day. (g) Except as provided in paragraph (i) of this section, the notice...

  15. Evaluation of Salmon Spawning Below Bonneville Dam Annual Report October 2006 - September 2007.

    SciTech Connect

    Arntzen, Evan V.; Mueller, Robert P.; Murray, Katherine J.; Bott, Yi-Ju

    2008-08-08

    From 1999 through 2007, the Fish and Wildlife Program of the Bonneville Power Administration funded a project to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Data were collected to ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. The projects objectives are consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Because of the influence of mainstem habitat on salmon production, there is a continued need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. During FY 2007, Pacific Northwest National Laboratory focused on (1) locating and mapping deep-water fall Chinook salmon and chum salmon spawning areas, (2) investigating the interaction between groundwater and surface water near fall Chinook and chum salmon spawning areas, and (3) providing in-season hyporheic temperature and water surface elevation data to assist state agencies with emergence timing and redd dewatering estimates. This report documents the studies and tasks performed by PNNL during FY 2007. Chapter 1 provides a description of the searches conducted for deepwater redds-adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the

  16. Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

    2005-12-22

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

  17. Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2002

    SciTech Connect

    Ploskey, Gene R. ); Schilt, Carl R.; Kim, J; Escher, Charles; Skalski, John R.

    2003-08-15

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) and the U.S. Army Engineer Research and Development Center (ERDC) conduct fish-passage studies at Bonneville Dam in 2002. The ERDC contracted with MEVATEC Corporation to provide staff ranging from scientists to technicians to help conduct the study. This study supports the Portland-District goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. In this report, we present results of two studies of juvenile salmonid passage at Bonneville Dam that we carried out in the 2002 downstream passage season April 20 through July 15, 2002. The first study of Project-wide FPE provides hourly estimates of fish passage and associated variances for all operating turbine units, spill bays, and the two sluiceway entrances at Powerhouse 1 (B1), as well as estimates of a variety of fish-passage efficiency and effectiveness measures. This was the third consecutive year of full-project hydroacoustic sampling and passage estimation. The second study was more narrowly focused on B2 turbines and had two components: (1) to sample the FGE at two modified turbine intakes and compare them with efficiencies of other B2 units that were sampled in the first study, and (2) to evaluate proportions of fish passing up into gatewell slots versus through screen gaps at a few B2 turbine intakes.

  18. Lake Bonneville - Constraints on lithospheric thickness and upper mantle viscosity from isostatic warping of Bonneville, Provo, and Gilbert stage shorelines

    NASA Technical Reports Server (NTRS)

    Bills, Bruce G.; May, Glenn M.

    1987-01-01

    Data collected from three deformed shorelines of Lake Bonneville (the Bonneville, Provo, and Gilbert shorelines) are used to constrain the effective elastic lithospheric thickness to 23 + or - 2 km, the mantle viscosity to (1.2 + or - 0.2) x 10 to the 20th Pa sec, and the depth to a significant viscosity increase to no less than 300 km. A modification of the earth model of Nakiboglu and Lambeck (1982, 1983) is used for the calculations, and the water load is computed at each time step from a digital terrain model and a specified lake elevation. Differences noted between the observed and computed shoreline elevations indicate a regional tilt down to the NE of about 6 x 10 to the -5th, which is suggested to be due to collapse of the peripheral bulge formed by the Laurentide ice sheet.

  19. 25 CFR 23.61 - Appeals from decision or action by Agency Superintendent, Area Director or Grants Officer.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... THE INTERIOR HUMAN SERVICES INDIAN CHILD WELFARE ACT Appeals § 23.61 Appeals from decision or action... consider the appeal in accordance with 25 CFR 2.20 (c) through (e). Appeal procedures shall be as set...

  20. 75 FR 32835 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Actions on Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    .... Executive Orders: E.O. 12898 Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations; E.O. 11593 Protection and Enhancement of Cultural Resources; E.O....

  1. 75 FR 80107 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Actions on Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-21

    .... Executive Orders: E.O. 12898 Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations; E.O. 11593 Protection and Enhancement of Cultural Resources; E.O....

  2. Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2005

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Zimmerman, Shon A.; Hughes, James S.; Bouchard, Kyle E.; Fischer, Eric S.; Schilt, Carl R.; Hanks, Michael E.; Kim, Jina; Skalski, John R.; Hedgepeth, J.; Nagy, William T.

    2006-12-04

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2005. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of two studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 16 and July 15, 2005, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, and (2) smolt approach and fate at B1 Sluiceway Outlet 3C from the B1 forebay. Some of the large appendices are only presented on the compact disk (CD) that accompanies the final report. Examples include six large comma-separated-variable (.CSV) files of hourly fish passage, hourly variances, and Project operations for spring and summer from Appendix E, and large Audio Video Interleave (AVI) files with DIDSON-movie clips of the area upstream of B1 Sluiceway Outlet 3C (Appendix H). Those video clips show smolts approaching the outlet, predators feeding on smolts, and vortices that sometimes entrained approaching smolts into turbines. The CD also includes Adobe Acrobat Portable Document Files (PDF) of the entire report and appendices.

  3. Great Salt Lake and Bonneville Salt Flats, UT, USA

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This is a view of the Great Salt Lake and nearby Bonneville Salt Flats, UT, (41.0N, 112.5W). A railroad causeway divides the lake with a stark straight line changing the water level and chemistry of the lake as a result. Fresh water runoff enters from the south adding to the depth and reducing the salinity. The north half receives little frsh water and is more saline and shallow. The Bonnieville Salt Flats is the lakebed of a onetime larger lake.

  4. 12 CFR 19.135 - Applications for stay or review of disciplinary actions imposed by registered clearing agencies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commission (SEC) pursuant to section 19 of the Securities Exchange Act of 1934 (15 U.S.C. 78s) regarding... sanctions or summary suspensions imposed by registered clearing agencies (17 CFR 240.19d-2) apply to applications by national banks. References to the “Commission” are deemed to refer to the “OCC.” (b)...

  5. 78 FR 42151 - Notice of Final Federal Agency Actions on the Goethals Bridge Replacement Project in New York and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... Populations; E.O. 11593 Protection and Enhancement of Cultural Resources; E.O. 13007 Indian Sacred Sites; E.O... Web site at www.panynj.gov/goethalsbridge . This notice applies to all Federal agency decisions as of...(c)]; Native American Grave Protection and Repatriation Act (NAGPRA) . 6. Social and Economic:...

  6. 76 FR 56493 - Notice of Final Federal Agency Actions on State Loop 375 From Interstate Highway 10 to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... Conservation Fund (LWCF), 16 U.S.C. 4601-4604; Safe Drinking Water Act (SDWA), 42 U.S.C. 300(f)-300(j)(6... Interstate Highway 10 to the Franklin Mountains State Park in Texas AGENCY: Federal Highway Administration..., upgrades to Texas State Loop 375 from Interstate Highway 10 to 0.479 Mile East of the Tom Mays Unit of...

  7. 78 FR 32530 - Notice of Final Federal Agency Action on Proposed Highway in Georgia the Northwest I-75/I-575...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... Northwest I-75/I-575 Corridor, Cobb and Cherokee Counties, Georgia (Atlanta Metropolitan Area) AGENCY... Administrator, Georgia Division, Federal Highway Administration, 61 Forsyth Street, Suite 17T100; Atlanta... Department of Transportation, 600 West Peachtree Street, 22th Floor, Atlanta, Georgia 30308, 8:00 a.m. to...

  8. Improving the Implementation of an United States Accrediting Agency's Retention Standard through Best Practices: An Action Research Study

    ERIC Educational Resources Information Center

    King, Terron A.

    2016-01-01

    Over the last decade, higher education has come under intense scrutiny from the government; accrediting agencies in particular have come under fire for a lack of accountability and transparency. Reports from the Commission on the Future of Higher Education and the Health, Education, Labor and Pensions (HELP) Committee served as a driving force for…

  9. Late Quaternary environmental change in the Bonneville basin, western USA

    USGS Publications Warehouse

    Madsen, D.B.; Rhode, D.; Grayson, D.K.; Broughton, J.M.; Livingston, S.D.; Hunt, J.; Quade, Jay; Schmitt, D.N.; Shaver, M. W.

    2001-01-01

    Excavation and analyses of small animal remains from stratified raptor deposits spanning the last 11.5 ka, together with collection and analysis of over 60 dated fossil woodrat midden samples spanning the last 50 ka, provide a detailed record of changing climate in the eastern Great Basin during the late Pleistocene and Holocene. Sagebrush steppe dominated the northern Bonneville basin during the Full Glacial, suggesting that conditions were cold and relatively dry, in contrast to the southern basin, which was also cold but moister. Limber pine woodlands dominated ???13-11.5 ka, indicating increased dryness and summer temperatures ???6-7??C cooler than present. This drying trend accelerated after ???11.5 ka causing Lake Bonneville to drop rapidly, eliminating 11 species of fish from the lake. From ???11.5-8.2 ka xerophytic sagebrush and shadscale scrub replaced more mesophilic shrubs in a step-wise fashion. A variety of small mammals and plants indicate the early Holocene was ???3??C cooler and moister than at present, not warmer as suggested by a number of climatic models. The diversity of plants and animals changed dramatically after 8.2 ka as many species disappeared from the record. Some of the upland species returned after ???4 ka and Great Salt Lake became fresh enough at ???3.4 and ???1.2 ka to support populations of Utah chub. ?? 2001 Elsevier Science B.V.

  10. Modeling lithospheric rheology from modern measurements of Bonneville shoreline deformation

    NASA Astrophysics Data System (ADS)

    Beard, Eric P.

    Here I develop a cross-correlation approach to estimating heights of shoreline features, and apply the new method to paleo-shorelines of Pleistocene Lake Bonneville. I calculaTe 1st-derivative (slope) and 2nd-derivative (curvature) profiles from Digital Elevation Model (DEM) or Global Positioning SysTem Real-Time Kinematic (GPS-RTK) measurements of elevation. I then cross-correla Te pairs of profiles that have been shifT ed by various "lags," or shifts in elevation. The correlation coefficient (a normalized dot-product measure of similarity) is calcula Ted as a function of lag within small (~40 m) windows cenTered at various elevations. The elevation and lag with the greaTest correlation coefficient indicaTes the shoreline elevation at the reference profile and the change in shoreline height for the profile pair. I evalua Te several different algorithms for deriving slope and curvature by examining closure of elevation lags across profile triples. I then model isostatic response to Lake Bonneville loading and unloading. I first model lakeshore uplift response to lake load removal assuming an elastic layer over an inviscid half-space. I obtain a best-fit comparison of predic Ted to observed shoreline heights for the Bonneville level with an elastic layer thickness, Te, of 25±2 km (at 95% confidence) when using only previously published shoreline elevation estimaTes. The best-fit for the Bonneville level when using these estimaTes plus 44 new estima Tes suggests a Te of 26±2 km. The best-fit model for the Provo level suggests Te of 17±3 km. For the Gilbert level, the response is insensitive to the assumed Te. I next model isostatic response to Bonneville loading and unloading

  11. 75 FR 7304 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Actions on Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-18

    ... meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed Physical Suicide Deterrent System on the... Gate Bridge Physical Suicide Deterrent System on US Route 101 at the San Francisco/Marin County line. The purpose of the project is to consider a physical suicide deterrent system on the Golden...

  12. 45 CFR 61.7 - Reporting licensure actions taken by Federal or State licensing and certification agencies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (regardless of whether the final adverse action is the subject of a pending appeal)— (1) Formal or official... operation of law, voluntary surrender, non-renewal (excluding nonrenewals due to nonpayment of fees... an individual, that individual's employment or professional identifiers, including: (i)...

  13. 76 FR 79755 - Notice of Final Federal Agency Actions on the Interstate 95 High Occupancy Toll Lanes Project in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... efficiently, provide higher reliability of travel times, and expand travel choices. The actions taken by FHWA..., unless a shorter time is specified in the Federal law pursuant to which judicial review is allowed. FOR....gov . The FHWA Virginia Division Office's normal business hours are 8 a.m. to 5 p.m. (eastern...

  14. Final Environmental Assessment and Finding of No Significant Impact: White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam

    SciTech Connect

    N /A

    2003-04-23

    Bonneville Power Administration (BPA) is proposing to fund the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The project proposes to continue to carry out harvest monitoring and stock status updates coordinated with fisheries management planning, annual young-of-the year recruitment indexing, research, experimental artificial propagation, and transport of white sturgeon to less densely populated areas of the river(s). Additionally, release of hatchery-reared juveniles is proposed to evaluate release strategies. Actions will take place in the following Columbia River mainstem reaches: Bonneville, The Dalles, John Day, and McNary Reservoirs; Hanford Reach, as well as the Wanapum and Rock Island Reservoirs; and the following Snake River mainstem reaches: Ice Harbor, Lower Monumental and Little Goose Reservoirs. Spawning and rearing are undertaken at established hatcheries at McNary Dam and also the Abernathy Fish Technology Center. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1367, April 2003) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  15. 77 FR 52708 - Agency Information Collection Activities: Proposed Collection; Comment Request; Generic Clearance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... (75 FR 80542). Below we provide the BPA projected average estimates for the next three years: \\1\\ \\1...: Bonneville Power Administration (BPA), DOE. ACTION: 30-Day notice of submission of information...

  16. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Review and Approval § 300.20 Interim acceptance and review of Bonneville Power Administration rates. (a) Opportunity to comment. The Commission will publish in the Federal Register notice of any filing made...

  17. The future of the Bonneville Power Administration: Aggressive competitor or bureaucratic dinosaur?

    SciTech Connect

    Hardy, R.W.

    1999-01-01

    Splitting the Bonneville Power Administration into fully separate generating and transmission entities is the only step, short of privatization or regionalization, that would eliminate the conflict between compliance with the Federal Energy Regulatory Commission`s open access requirements and the need to maximize Bonneville Power Administration revenues for taxpayers.

  18. 78 FR 15718 - United States Department of Energy, Bonneville Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission United States Department of Energy, Bonneville Power Administration; Notice of Filing Take notice that on March 1, 2013, the Bonneville Power Administration filed a proposed tariff amendment as a revision to the...

  19. Evaluation of Salmon Spawning Below Bonneville Dam, Annual Report October 2005 - September 2006.

    SciTech Connect

    Arntzen, Evan V.; Mueller, Robert P.; Murray, Christopher J.

    2007-09-21

    Since FY 2000, scientists at Pacific Northwest National Laboratory (PNNL) have conducted research to assess the extent of spawning by chum salmon (Oncorhynchus keta) and fall Chinook salmon (O. tshawytscha) in the lower mainstem Columbia River. Their work supports a larger project funded by the Bonneville Power Administration (BPA) aimed at characterizing the physical habitat used by mainstem fall Chinook and chum salmon populations. Multiple collaborators in addition to PNNL are involved in the BPA project--counterparts include the Washington Department of Fish and Wildlife (WDFW), U.S. Fish and Wildlife Service (USFWS), Pacific States Marine Fisheries Commission (PSMFC), U.S. Geological Survey (USGS), and Oregon Department of Fish and Wildlife (ODFW). Data resulting from the individual tasks each agency conducts are providing a sound scientific basis for developing strategies to operate the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance the chum and tule fall Chinook salmon populations--both listed as threatened under the Endangered Species Act (ESA). Fall Chinook salmon, thought to originate from Bonneville Hatchery, were first noted to be spawning downstream of Bonneville Dam by WDFW biologists in 1993. Known spawning areas include gravel beds on the Washington side of the river near Hamilton Creek and near Ives Island. Limited surveys of spawning ground were conducted in the area around Ives and Pierce islands from 1994 through 1997. Based on those surveys, it is believed that fall Chinook salmon are spawning successfully in this area. The size of this population from 1994 to 1996 was estimated at 1800 to 5200 fish. Chum salmon also have been documented spawning downstream of Bonneville Dam. Chum salmon were listed as threatened under the ESA in March 1999. At present there is a need to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning

  20. Evaluation of Salmon Spawning Below Bonneville Dam, 2005-2006 Annual Report.

    SciTech Connect

    Arntzen, Evan; Mueller, Robert; Murray, Christopher

    2007-03-01

    Since FY 2000, scientists at Pacific Northwest National Laboratory (PNNL) have conducted research to assess the extent of spawning by chum salmon (Oncorhynchus keta) and fall Chinook salmon (O. tshawytscha) in the lower mainstem Columbia River. Their work supports a larger project funded by the Bonneville Power Administration (BPA) aimed at characterizing the physical habitat used by mainstem fall Chinook and chum salmon populations. Multiple collaborators in addition to PNNL are involved in the BPA project--counterparts include the Washington Department of Fish and Wildlife (WDFW), U.S. Fish and Wildlife Service (USFWS), Pacific States Marine Fisheries Commission (PSMFC), U.S. Geological Survey (USGS), and Oregon Department of Fish and Wildlife (ODFW). Data resulting from the individual tasks each agency conducts are providing a sound scientific basis for developing strategies to operate the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance the chum and tule fall Chinook salmon populations--both listed as threatened under the Endangered Species Act (ESA). Fall Chinook salmon, thought to originate from Bonneville Hatchery, were first noted to be spawning downstream of Bonneville Dam by WDFW biologists in 1993. Known spawning areas include gravel beds on the Washington side of the river near Hamilton Creek and near Ives Island. Limited surveys of spawning ground were conducted in the area around Ives and Pierce islands from 1994 through 1997. Based on those surveys, it is believed that fall Chinook salmon are spawning successfully in this area. The size of this population from 1994 to 1996 was estimated at 1800 to 5200 fish. Chum salmon also have been documented spawning downstream of Bonneville Dam. Chum salmon were listed as threatened under the ESA in March 1999. At present there is a need to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning

  1. Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory

    SciTech Connect

    Lee, A.D.; Conger, R.L.

    1996-06-01

    The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

  2. Above Bonneville Passage and Propagation Cost Effectiveness Analysis.

    SciTech Connect

    Paulsen, C.M.; Hyman, J.B.; Wernstedt, K.

    1993-05-01

    We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region.

  3. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA (Environmental Protection Agency) standards (40 CFR Part 192)

    SciTech Connect

    Not Available

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs.

  4. Cross-species coherence in effects and modes of action in support of causality determinations in the U.S. Environmental Protection Agency's Integrated Science Assessment for Lead.

    PubMed

    Lassiter, Meredith Gooding; Owens, Elizabeth Oesterling; Patel, Molini M; Kirrane, Ellen; Madden, Meagan; Richmond-Bryant, Jennifer; Hines, Erin Pias; Davis, J Allen; Vinikoor-Imler, Lisa; Dubois, Jean-Jacques

    2015-04-01

    The peer-reviewed literature on the health and ecological effects of lead (Pb) indicates common effects and underlying modes of action across multiple organisms for several endpoints. Based on such observations, the United States (U.S.) Environmental Protection Agency (EPA) applied a cross-species approach in the 2013 Integrated Science Assessment (ISA) for Lead for evaluating the causality of relationships between Pb exposure and specific endpoints that are shared by humans, laboratory animals, and ecological receptors (i.e., hematological effects, reproductive and developmental effects, and nervous system effects). Other effects of Pb (i.e., cardiovascular, renal, and inflammatory responses) are less commonly assessed in aquatic and terrestrial wildlife limiting the application of cross-species comparisons. Determinations of causality in ISAs are guided by a framework for classifying the weight of evidence across scientific disciplines and across related effects by considering aspects such as biological plausibility and coherence. As illustrated for effects of Pb where evidence across species exists, the integration of coherent effects and common underlying modes of action can serve as a means to substantiate conclusions regarding the causal nature of the health and ecological effects of environmental toxicants.

  5. Precise time dissemination and applications development on the Bonneville Power Administration system

    NASA Technical Reports Server (NTRS)

    Martin, Ken E.; Esztergalyos, J.

    1992-01-01

    The Bonneville Power Administration (BPA) uses IRIG-B transmitted over microwave as its primary system time dissemination. Problems with accuracy and reliability have led to ongoing research into better methods. BPA has also developed and deployed a unique fault locator which uses precise clocks synchronized by a pulse over microwaves. It automatically transmits the data to a central computer for analysis. A proposed system could combine fault location timing and time dissemination into a Global Position System (GPS) timing receiver and close the verification loop through a master station at the Dittmer Control Center. Such a system would have many advantages, including lower cost, higher reliability, and wider industry support. Test results indicate the GPS has sufficient accuracy and reliability for this and other current timing requirements including synchronous phase angle measurements. A phasor measurement system which provides phase angle has recently been tested with excellent results. Phase angle is a key parameter in power system control applications including dynamic braking, DC modulation, remedial action schemes, and system state estimation. Further research is required to determine the applications which can most effectively use real-time phase angle measurements and the best method to apply them.

  6. Demonstration Assessment of Light-Emitting Diode (LED) Retrofit Lamps at the Lobby of the Bonneville Power Administration, Portland, OR

    SciTech Connect

    Miller, Naomi

    2011-07-01

    This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in the lobby of the Bonneville Power Administration (BPA) headquarters building in Portland, Oregon. The project involved a simple retrofit of 32 track lights used to illuminate historical black-and-white photos and printed color posters from the 1930s and 1940s. BPA is a federal power marketing agency in the Northwestern United States, and selected this prominent location to demonstrate energy efficient light-emitting diode (LED) retrofit options that not only can reduce the electric bill for their customers but also provide attractive alternatives to conventional products, in this case accent lighting for BPA's historical artwork.

  7. City of North Bonneville, Washington: Geothermal Exploration production test well

    NASA Astrophysics Data System (ADS)

    1982-06-01

    Based on discussions with the City of North Bonneville, the production test well was drilled to a depth that would also explore for ground water temperatures near 130 F (54.4 C). Depth projections to a 130 F bottom hole temperature were made by assuming a constant ground water temperature rise greater than 50 C per kilometer, and by assuming that essentially homogeneous or equivalent conductive rock units would be encountered. Minimum water production requirements were not set, although the City determined that about 800 gpm would be acceptable. Larger upper casing diameters of 16 and 12 inches were installed in order to provide the future use of either a vertical turbine or submersible pump, as desired by the city. The scope of work included interpretation of well characteristics, evaluation of ground water as a geothermal resource, geologic analysis of data from drilling and testing, drilling supervision, daily drilling cost accounting, and preparation of a final report. The report includes geologic evaluation of the drilling and test data, ground water and geothermal potential.

  8. A Rocky Rim Around 'Bonneville' in 3-D

    NASA Technical Reports Server (NTRS)

    2004-01-01

    [figure removed for brevity, see original site] Figure 1

    [figure removed for brevity, see original site] Figure 2

    This stereo view was taken by the panoramic camera on NASA's Mars Exploration Rover Spirit on the rover's 82nd martian day, or sol (March 27, 2004). At that point in its primary mission, Spirit was investigating a rock called 'Mazatzal' on the rim of 'Bonneville Crater.' The image shows rocky terrain surrounding the crater. The rover had to pick its way through that terrain on its way to the 'Columbia Hills,' in the distance on the left. Rolling terrain is apparent in the mid-distance. Barely visible to the right of the hills is the outline of the distant rim of Gusev Crater.

    This view is presented as cylindrical-perspective projection. It combines images from the left and right eyes of the panoramic camera, taken through blue filters on both sides.

    Figure 1 is the left-eye view of a stereo pair and Figure 2 is the right-eye view of a stereo pair.

  9. 1993 status report - The Bonneville Power Administration's geothermal program

    SciTech Connect

    Darr, G.D. )

    1993-01-01

    The Bonneville Power Administration's (BPA) Geothermal Program includes up to three demonstration (pilot) power projects that will initiate development of high-potential reservoirs in the Pacific Northwest. The program also includes activities that support the pilot projects and that encourage the use of the region's geothermal resources. Activities supporting the pilot projects include initiating environmental baseline monitoring programs and conducting environmental and economic impact studies. Research activities include efforts to better understand the cold water blanket phenomenon in the Cascades, a study to characterize the hydrothermal system in the Pueblo Valley, a geothermal exploration program in southeastern Oregon, and support for research to expand the use of slim-holes for resource confirmation. Efforts to address institutional issues include support for the Regional Renewables Project, which will help Northwest environmentalists become more knowledgeable about the role of conservation and renewables in the region's energy picture. A guide to geothermal permitting and licensing was prepared to help developers and utilities find their way through the regulatory maze. A geothermal curriculum is being developed for grades 4 through 8 in the Oregon schools. Data on the location and operating experience of existing U.S. geothermal plants has been collected in a database. Market penetration of geothermal heat pumps is being encouraged through a demonstration project in Montana and by helping BPA customers prepare proposals for geothermal heat pump projects that can compete successfully in BPA power acquisitions.

  10. Selected hydrologic data for the Bonneville Salt Flats and Pilot Valley, western Utah, 1991-93

    USGS Publications Warehouse

    Mason, James L.; Brothers, W.C.; Gerner, L.J.; Muir, P.S.

    1995-01-01

    This report contains hydrologic data collected during 1991-93 in the Bonneville Salt Flats and Pilot Valley study area of western Utah. These data were collected in cooperation with the U.S. Department of the Interior, Bureau of Land Management, as part of a study to investigate possible salt loss from the Bonneville Salt Flats. The Bonneville Salt Flats and adjacent Pilot Valley are located in the western part of the Great Salt Lake Desert in Utah, near the Nevada border. The Bonneville Salt Flats playa has a thick, perennial salt crust and the Pilot Valley playa has a thin, ephemeral salt crust. Well-completion data, including well depth and screened intervals, are presented in this report for selected shallow and deep monitoring wells. Water-level measurements are reported with corresponding specfic-gravity and temperature measurements. Results of chemical analyses are reported for brine collected from wells and pore fluids extracted from cores.

  11. Valuation of selected environmental impacts associated with Bonneville Power Administration Resource Program alternatives

    SciTech Connect

    Englin, J E; Gygi, K F

    1992-03-01

    This report documents work undertaken by the Pacific Northwest Laboratory (PNL) and its contractors to assist the Bonneville Power Administration (Bonneville) in assessing the potential environmental consequences of new power resources. A major purpose of this effort is to describe and evaluate the techniques available for economic valuation of environmental costs. Another is to provide estimates of the environmental costs associated with specific power resources called for under Bonneville's Resource Programs. Bonneville's efforts to extend valuation techniques to as many impacts as can be reliably assessed represents a substantial advance in the application of state-of-the-art economic techniques to environmental assessments. This economic analysis evaluates effects on human health, wildlife, crops, and visibility impacts associated with air pollution. This report also discusses river recreation (primarily fishing) which may be affected by fluctuations in water levels. 70 refs.

  12. 78 FR 13333 - Agency Information Collection Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    .... Energy Information Administration Agency Information Collection Extension AGENCY: U.S. Energy Information Administration (EIA), Department of Energy (DOE). ACTION: Agency Information Collection Activities: Information... of information is necessary for the proper performance of the functions of the agency,...

  13. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    SciTech Connect

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2011-02-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  14. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    SciTech Connect

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  15. 1992-1993 Bonneville Appliance Efficiency Program: Showerhead evaluation. Volume I - report

    SciTech Connect

    Warwick, W.M.

    1995-01-01

    The Bonneville Power Administration (Bonneville) provides wholesale electric power to over 100 retail distribution utilities in the Pacific Northwest. Bonneville is faced with meeting growing loads from these utilities. It acquires conservation as one means of meeting this load growth. Bonneville has offered a variety of conservation programs since 1980. Efficient showerheads have been a feature in residential conservation programs ever since. Bonneville launched the Residential Appliance Efficiency Program to focus on water-heater energy conservation opportunities in 1992. The Residential Appliance Efficiency Program consists of two parts, a water-heater efficiency program, and a hot-water efficiency program. This report evaluates the savings and costs of the first two years of the showerhead portion of the Residential Appliance Efficiency Program (the showerhead program). Although it is not a formal evaluation of the program limited to implementation or a {open_quotes}process{close_quotes} evaluation, observations about program design and implementation are included as appropriate. Results of this evaluation are limited to program participants within the Bonneville service territory.

  16. Reinterpretation of the exposed record of the last two cycles of Lake Bonneville, Western United States

    USGS Publications Warehouse

    Scott, W.E.; McCoy, W.D.; Shroba, R.R.; Rubin, M.

    1983-01-01

    A substantially modified history of the last two cycles of Lake Bonneville is proposed. The Bonneville lake cycle began prior to 26,000 yr B.P.; the lake reached the Bonneville shoreline about 16,000 yr B.P. Poor dating control limits our knowledge of the timing of subsequent events. Lake level was maintained at the Bonneville shoreline until about 15,000 yr B.P., or somewhat later, when catastrophic downcutting of the outlet caused a rapid drop of 100 m. The Provo shoreline was formed as rates of isostatic uplift due to this unloading slowed. By 13,000 yr B.P., the lake had fallen below the Provo level and reached one close to that of Great Salt Lake by 11,000 yr B.P. Deposits of the Little Valley lake cycle are identified by their position below a marked unconformity and by amino acid ratios of their fossil gastropods. The maximum level of the Little Valley lake was well below the Bonneville shoreline. Based on degree of soil development and other evidence, the Little Valley lake cycle may be equivalent in age to marine oxygenisotope stage 6. The proposed lake history has climatic implications for the region. First, because the fluctuations of Lake Bonneville and Lake Lahontan during the last cycle of each were apparently out of phase, there may have been significant local differences in the timing and character of late Pleistocene climate changes in the Great Basin. Second, although the Bonneville and Little Valley lake cycles were broadly synchronous with maximum episodes of glaciation, environmental conditions necessary to generate large lakes did not exist during early Wisconsin time. ?? 1983.

  17. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2002-2003 Annual Report.

    SciTech Connect

    van der Naald, Wayne; Clark, Roy; Brooks, Robert

    2004-01-01

    In 2002 a total of 364 adult fall chinook and 472 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 290 fall chinook and 403 chum samples. The peak redd count for fall chinook was 214. The peak redd count for chum was 776. Peak spawning time for fall chinook was set at approximately 15 November. Peak spawning time for chum occurred approximately 6 December. There were estimated to be a total of 1,881 fall chinook spawning below Bonneville Dam in 2002. The study area's 2002 chum population was estimated to be 4,232 spawning fish. Temperature unit data suggests that below Bonneville Dam 2002 brood bright stock, fall chinook emergence began on February 3 2003 and ended 7 May 2003, with peak emergence occurring 20 April. 2002 brood juvenile chum emergence below Bonneville Dam began 27 January and continued through 6 April 2003. Peak chum emergence took place 1 March. A total of 10,925 juvenile chinook and 1,577 juvenile chum were sampled between the dates of 24 January and 21 July 2003 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2003 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2002 and 2003 the majority of fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock of fall chinook. Observed spawning times, adult age and sex composition, GSI and DNA analysis

  18. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2003-2004 Annual Report.

    SciTech Connect

    van der Naald, Wayne; Duff, Cameron; Brooks, Robert

    2005-01-01

    In 2003 a total of 253 adult fall chinook and 113 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 221 fall chinook and 109 chum samples. The peak redd count for fall chinook was 190. The peak redd count for chum was 262. Peak spawning time for fall chinook was set at approximately 24 November. Peak spawning time for chum occurred approximately 24 November. There were estimated to be a total of 1,533 fall chinook spawning below Bonneville Dam in 2003. The study area's 2003 chum population was estimated to be 688 spawning fish. Temperature unit data suggests that below Bonneville Dam 2003 brood bright stock, fall chinook emergence began on January 6, 2004 and ended 28 April 2004, with peak emergence occurring 13 April. 2003 brood juvenile chum emergence below Bonneville Dam began 22 February and continued through 15 April 2004. Peak chum emergence took place 25 March. A total of 25,433 juvenile chinook and 4,864 juvenile chum were sampled between the dates of 20 January and 28 June 2004 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2004 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2003 all of the fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence timing

  19. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    SciTech Connect

    N /A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  20. Bonneville Power Administration Transmission System Vegetation Management Program Draft Environmental Impact Statement

    SciTech Connect

    N /A

    1999-08-20

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from the electric facilities; (2) increase the program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This DEIS establishes Planning Steps for managing vegetation for specific projects (to be tiered to this EIS). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, they consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would factor a management approach that

  1. Bonneville basin shoreline records of a large lake during Marine Isotope Stage 16

    NASA Astrophysics Data System (ADS)

    Nishizawa, Shizuo; Currey, Donald R.; Brunelle, Andrea; Sack, Dorothy

    2012-12-01

    The occurrence of the 650,000-year-old Rye Patch Dam tephra within shoreline sedimentary sequences suggests the presence of a large lake in the Bonneville basin in North America during Marine Isotope Stage (MIS) 16. The observed shoreline sedimentology and stratigraphy indicate that the lake was expanding when the air-fall ash landed onto the lake water. The minimum estimated surface area of the 650 ka lake almost equals that of Lake Bonneville during the Provo stage in late MIS 2. The magnitude of the 650 ka large lake implies that the climatic and hydrologic conditions in the Bonneville basin during early MIS 16 might have been comparable to those in late MIS 2.

  2. Inspection of surveillance activities and administrative leave policy at Bonneville Power Administration, Portland, Oregon

    SciTech Connect

    Not Available

    1994-04-01

    The authors conducted an inspection of surveillance activities and administrative leave policy at the Bonneville Power Administration, Portland, Oregon. The purpose of their inspection was to determine if a covert video surveillance operation conducted at Bonneville Power Administration was consistent with Department of Energy policies and procedures and other applicable regulations and procedures, and to determine if administrative leave policies and procedures used at Bonneville Power Administration in a specific instance were consistent with Department of Energy requirements and the Code of Federal Regulations. This inspection focused on a specific incident that occurred in 1989 on the 5th floor of the BPA Headquarters Building located in Portland, Oregon. The incident involved the soiling of an employee`s personal property with what appeared to be urine.

  3. 76 FR 28757 - Defense Logistics Agency Revised Regulation 1000.22, Environmental Considerations in Defense...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... of the Secretary Defense Logistics Agency Revised Regulation 1000.22, Environmental Considerations in Defense Logistics Agency Actions AGENCY: Defense Logistics Agency, Department of Defense. ACTION: Notice of Availability (NOA) of Revised Defense Logistics Agency Regulation. SUMMARY: The Defense...

  4. Follow-up process evaluation of Bonneville Power Administration's energy savings plan program

    SciTech Connect

    Jennings, J.G.; Peters, J.S. )

    1990-01-01

    The Energy $avings Plan (E$P) program has been operated by the Bonneville Power Administration (Bonneville) since late fall 1987. The program is designed to build capability in the acquisition of conservation resources in the non-aluminum industrial sector in the Pacific Northwest. According to the Northwest Power Planning Council, the non-aluminum industrial sector accounts for about 23% of the total regional electricity consumption. Five non-aluminum industries consume 85% of this total. Three major industries --- chemical producers, pulp and paper plants, and lumber mills --- account for around 68% of non-aluminum industrial consumption (i.e., 16% of the total regional electricity consumption). 1 ref.

  5. The Bonneville Estates Rockshelter rodent fauna and changes in Late Pleistocene-Middle Holocene climates and biogeography in the Northern Bonneville Basin, USA

    NASA Astrophysics Data System (ADS)

    Schmitt, Dave N.; Lupo, Karen D.

    2012-07-01

    Excavations at Bonneville Estates Rockshelter, Nevada recovered rodent remains from stratified deposits spanning the past ca. 12,500 14C yr BP (14,800 cal yr BP). Specimens from horizons dating to the late Pleistocene and early Holocene include species adapted to montane and moist and cool habitats, including yellow-bellied marmot (Marmota flaviventris) and bushy-tailed woodrat (Neotoma cinerea). Shortly after 9000 14C BP (10,200 cal yr BP) these mammals became locally extinct, or nearly so, taxonomic diversity declined, and the region became dominated by desert woodrats (Neotoma lepida) and other species well-adapted to xeric, low-elevation settings. The timing and nature of changes in the Bonneville Estates rodent fauna are similar to records reported from nearby Homestead and Camels Back caves and provide corroborative data on terminal Pleistocene-early Holocene environments and mammalian responses to middle Holocene desertification. Moreover, the presence of northern pocket gopher (Thomomys talpoides) at Bonneville Estates adds to a sparse regional record for that species and, similar to Homestead Cave, it appears that the ca. 9500 14C yr BP (10,800 cal yr BP) replacement of the northern pocket gopher by Botta's pocket gopher in the Great Salt Lake Desert vicinity was also in response to climate change.

  6. 77 FR 17464 - Agency Information Collection Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    .... Energy Information Administration Agency Information Collection Extension AGENCY: U.S. Energy Information Administration (EIA), Department of Energy. ACTION: Agency Information Collection Activities: Information...) Whether the proposed collection of information is necessary for the proper performance of the functions...

  7. 77 FR 20616 - Agency Information Collection Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-05

    ... Information Administration Agency Information Collection Extension AGENCY: U.S. Energy Information Administration (EIA), Department of Energy. ACTION: Agency Information Collection Activities: Information... Price Survey;'' Comments are invited on: (a) Whether the proposed collection of information is...

  8. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    SciTech Connect

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  9. 77 FR 56639 - Bonneville Power Administration; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Bonneville Power Administration; Notice of Petition for Declaratory Order Take notice that on September 4, 2012, pursuant to sections 35.28(e) and 207 of the Federal...

  10. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER...

  11. 78 FR 39279 - United States Department of Energy; Bonneville Power Administration; Notice of Petition for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission United States Department of Energy; Bonneville Power Administration; Notice of Petition for Declaratory Order Take notice that on June 19, 2013, pursuant to sections 35.28(e) and 385.207 of the Federal Energy...

  12. 77 FR 50207 - Notice of Final Federal Agency Actions on Project: I-5: Glendale-Hugo Paving/Sexton Climbing Lane...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Paving/Sexton Climbing Lane: Douglas and Josephine Counties, OR AGENCY: Federal Highway Administration... relate to a proposed highway project, I-5: Glendale-Hugo Paving/Sexton Climbing Lane, in Douglas...

  13. The role of forensic medical services of Azerbaijan Republic in cases of natural calamities, terrorist actions and other urgent situations--organizational principles of joint activities of forensic medical services and the law-enforcement agencies.

    PubMed

    Youssifli, R M; Hassanov, E G

    1996-01-01

    Disastrous natural calamities, large-scale catastrophes and terrorist actions are characterized by a sudden and unexpected character and lead to numerous human victims. As a rule this fact seriously aggravates the work of local medical service and the law-enforcement agencies. Nowadays not a single society can totally guarantee itself from the danger of natural calamities, terrorist actions and emergency situations. Taking into consideration peculiarities of our country and also aware of the international experience a brand new set of preventive measures was elaborated by forensic experts of Azerbaijan in close cooperation with the law-enforcement bodies. The basic purpose of these sets of actions is to relieve the consequences of such kinds of unpredictable cases. PMID:8908988

  14. Multi-Scale Action Effectiveness Research in the Lower Columbia River and Estuary, 2011 - FINAL ANNUAL REPORT

    SciTech Connect

    Sather, Nichole K.; Storch, Adam; Johnson, Gary E.; Teel, D. J.; Skalski, J. R.; Bryson, Amanda J.; Kaufmann, Ronald M.; Woodruff, Dana L.; Blaine, Jennifer; Kuligowski, D. R.; Kropp, Roy K.; Dawley, Earl M.

    2012-05-31

    The study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL), the Oregon Department of Fish and Wildlife (ODFW), the University of Washington (UW), and the National Marine Fisheries Service (NMFS) for the U.S. Army Corps of Engineers, Portland District (USACE). This research project was initiated in 2007 by the Bonneville Power Administration to investigate critical uncertainties regarding juvenile salmon ecology in shallow tidal freshwater habitats of the lower Columbia River. However, as part of the Washington Memorandum of Agreement, the project was transferred to the USACE in 2010. In transferring from BPA to the USACE, the focus of the tidal freshwater research project shifted from fundamental ecology toward the effectiveness of restoration in the Lower Columbia River and estuary (LCRE). The research is conducted within the Action Agencies Columbia Estuary Ecosystem Restoration Program (CEERP). Data reported herein spans the time period May 2010 to September 2011.

  15. The rise and fall of Lake Bonneville between 45 and 10.5 ka

    USGS Publications Warehouse

    Benson, L.V.; Lund, S.P.; Smoot, J.P.; Rhode, D.E.; Spencer, R.J.; Verosub, K.L.; Louderback, L.A.; Johnson, C.A.; Rye, R.O.; Negrini, R.M.

    2011-01-01

    A sediment core taken from the western edge of the Bonneville Basin has provided high-resolution proxy records of relative lake-size change for the period 45.1-10.5 calendar ka (hereafter ka). Age control was provided by a paleomagnetic secular variation (PSV)-based age model for Blue Lake core BL04-4. Continuous records of ??18O and total inorganic carbon (TIC) generally match an earlier lake-level envelope based on outcrops and geomorphic features, but with differences in the timing of some hydrologic events/states. The Stansbury Oscillation was found to consist of two oscillations centered on 25 and 24 ka. Lake Bonneville appears to have reached its geomorphic highstand and began spilling at 18.5 ka. The fall from the highstand to the Provo level occurred at 17.0 ka and the lake intermittently overflowed at the Provo level until 15.2 ka, at which time the lake fell again, bottoming out at ~14.7 ka. The lake also fell briefly below the Provo level at ~15.9 ka. Carbonate and ??18O data indicate that between 14.7 and 13.1 ka the lake slowly rose to the Gilbert shoreline and remained at about that elevation until 11.6 ka, when it fell again. Chemical and sedimentological data indicate that a marsh formed in the Blue Lake area at 10.5 ka.Relatively dry periods in the BL04-4 records are associated with Heinrich events H1-H4, suggesting that either the warming that closely followed a Heinrich event increased the evaporation rate in the Bonneville Basin and (or) that the core of the polar jet stream (PJS) shifted north of the Bonneville Basin in response to massive losses of ice from the Laurentide Ice Sheet (LIS) during the Heinrich event. The second Stansbury Oscillation occurred during Heinrich event H2, and the Gilbert wet event occurred during the Younger Dryas cold interval. Several relatively wet events in BL04-4 occur during Dansgaard-Oeschger (DO) warm events.The growth of the Bear River glacier between 32 and 17 ka paralleled changes in the values of proxy

  16. Judicial Review of Accrediting Agency Actions: Marlboro Corporation d/b/a The Emery School v. The Association of Independent Colleges and Schools

    ERIC Educational Resources Information Center

    Tayler, C. William; Hylden, Thomas

    1977-01-01

    In the Emery School case accreditation was withdrawn and the case appealed by the institution, raising the question of standards by which a court will judge the procedural fairness of the accrediting agency. Procedural fairness was attacked by the school. Lessons for accreditors and institutional administrators are discussed. (LBH)

  17. 78 FR 46603 - Final Agency Action To Transfer Title From the United States to the Pechanga Band of Luiseño...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... Indian Reservation, is described as follows: San Bernardino Meridian, California T. 8 S., R. 2 W., Sec... Band of Luise o Mission Indians and to San Diego Gas & Electric Company, California AGENCY: Bureau of... Pechanga Band of Luise o Mission Indians of the State of California and the Federal lands transferred...

  18. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    SciTech Connect

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  19. Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.

    SciTech Connect

    Not Available

    1985-01-01

    Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

  20. 78 FR 52190 - United States Department of Energy, Bonneville Power Administration: Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EF13-7-000, EF13-8-000, EF13-9-000, EF13-10-000, EF13-11- 000, EF13-12-000, EF13-13-000, EF13-14-000] United States Department of Energy, Bonneville Power Administration: Notice of Filing Take notice that...

  1. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    SciTech Connect

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  2. Improved Stratigraphic Interpretation of Dense Lacustrine Carbonates from Lake Bonneville, UT

    NASA Astrophysics Data System (ADS)

    Steponaitis, E.; McGee, D.; Quade, J.

    2014-12-01

    Recent work on the past hydroclimate of the Bonneville Basin has utilized dense, laminated carbonate deposits that formed beneath the surface of Lake Bonneville starting around 26 ka (McGee et al. 2012). These calcite and aragonite deposits form in calm, protected spaces that have been submerged by the lake, including hillside caves, cracks in bedrock, and interstitial spaces in tufa and abandoned beach gravel deposits. Dense lacustrine carbonates are very useful for paleoclimate studies because they can be used to develop continuous records of lake chemistry anchored by precise U-Th dates. However, many questions remain about the conditions in which these dense carbonates form: at what depth range do these carbonates form, and can basal and top ages help constrain the lake level curve? Do coeval carbonates formed at different depths in the lake preserve information about vertical gradients in lake water properties like δ18O and 87Sr/86Sr? To address these questions and others, this study examines a sequence of dense lacustrine carbonates deposited within bedrock, tufa, and abandoned shoreline gravels from Stansbury Island, UT. We use U-Th dating, local stratigraphic interpretations, and previously established lake level constraints to draw insights into the formation and context of these deposits. Improved understanding of dense lacustrine carbonates will facilitate more detailed and accurate interpretations of their stratigraphic significance, and ultimately, aid the development of improved paleoclimate records from Lake Bonneville and beyond. McGee, D., et al. 2012. Lacustrine Cave Carbonates : Novel Archives of Paleohydrologic Change in the Bonneville Basin (Utah , USA). Earth and Planetary Science Letters (351-352): 182-194.

  3. Pleistocene Lake Bonneville as an analog for extraterrestrial lakes and oceans: Chapter 21

    USGS Publications Warehouse

    Chan, M.A.; Jewell, P.; Parker, T.J.; Ormo, J.; Okubo, Chris; Komatsu, G.

    2016-01-01

    Geomorphic confirmation for a putative ancient Mars ocean relies on analog comparisons of coastal-like features such as shoreline feature attributes and temporal scales of process formation. Pleistocene Lake Bonneville is one of the few large, geologically young, terrestrial lake systems that exemplify well-preserved shoreline characteristics that formed quickly, on the order of a thousand years or less. Studies of Lake Bonneville provide two essential analog considerations for interpreting shorelines on Mars: (1) morphological variations in expression depend on constructional vs erosional processes, and (2) shorelines are not always correlative at an equipotential elevation across a basin due to isostasy, heat flow, wave setup, fetch, and other factors. Although other large terrestrial lake systems display supporting evidence for geomorphic comparisons, Lake Bonneville encompasses the most integrated examples of preserved coastal features related to basin history, sediment supply, climate, and fetch, all within the context of a detailed hydrograph. These collective terrestrial lessons provide a framework to evaluate possible boundary conditions for ancient Mars hydrology and large water body environmental feedbacks. This knowledge of shoreline characteristics, processes, and environments can support explorations of habitable environments and guide future mission explorations.

  4. Geologic Interpretation of the Geothermal Potential of the North Bonneville Area

    SciTech Connect

    Nielson, D.L.; Moran, M.R.

    1980-02-15

    Possible geothermal development for the township of North Bonneville, Washington is being investigated because of the proximity of the town to hot springs in a geologic province of good geothermal potential. Surface expression of geothermal resources is provided by conduits through an impermeable reservoir cap and is therefore generally structurally controlled. Near North Bonneville the geologic formations that underlie potential drilling sites are the Eagle Creek formation and the Ohanpecosh Formation. The Lower Miocene Eagle Creek Formation is composed of poorly consolidated volcanic conglomerates, sandstones, tuffs, and includes a few minor interbedded lava flows. The Eocene-Oligiocene Ohanapecosh (Weigle) Formation in its nearest exposures to North Bonneville is composed of volcaniclastics and lava flows. The Ohanapecosh has been altered to zeolites and clays and is therefore well consolidated and impermeable. The lack of permeability provides the necessary reservoir cap for any geothermal system that may be present at depth. This formation, to the northeast, in the Wind River drainage is greater than 19,000 ft. thick. Circulation of geothermal heated water from this thick sequence of impermeable strata must be associated with penetrating fracture zones.

  5. Statistical analysis of sand and gravel aggregate deposits of late Pleistocene Lake Bonneville, Utah

    USGS Publications Warehouse

    Bliss, James D.; Bolm, K.S.

    2001-01-01

    Sedimentary deposits of pluvial Lake Bonneville are an important source of sand and gravel suitable for aggregate and construction in Utah. Data on Lake Bonneville basin sand and gravel deposit thickness, volume, grain size, percent of fines, and durability were statistically analyzed to detect variations associated with geologic domains, geographic location, Lake Bonneville shorelines, and sand and gravel deposit type, and to construct quantitative deposit models. Analysis showed several trends; (1) sand and gravel in younger shorelines was slightly more durable and the deposits considerably larger in volume, (2) younger shorelines are also more likely to contain more than one genetic deposit type, (3) the volume of terrace deposits is larger than beach deposits, (4) terraces and beaches are generally thicker than spits and bars, (5) the northern part of the Bonneville Basin contains slightly more durable sand and gravel than the southern part of the basin and is more likely to contain deposits composed of more than one genetic deposit type, and (6) the Wasatch domain deposits are composed of more than one genetic deposit type more often than deposits of the Basin and Range domain. Three additional conclusions with immediate economic significance are; (1) the median sand and gravel deposit in the Wasatch domain, 360,000 m3 (275,000 yd3), is three times larger than that of the Basin and Range domain (120,000 m3 [90,000 yd3]), (2) the median deposit thickness in the Wasatch domain, 5.8 m (19.0 ft), is nearly twice that of the Basin and Range domain (3 m [10 ft]), and (3) the Wasatch domain also contains slightly larger diameter gravel. These three conclusions are significant because the trend for sand and gravel development in the Bonneville Basin is to move from the Wasatch domain to the Basin and Range domain. Smaller, thinner deposits with smaller diameter gravel will require more surface area to mine than would have been necessary in the Wasatch domain. The

  6. Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam

    SciTech Connect

    Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

    2007-01-30

    At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at

  7. Bonneville Power Administration, Fish and Wildlife Implementation Plan Draft Environmental Impact Statement

    SciTech Connect

    N /A

    2001-06-22

    Despite the efforts of BPA and other regional entities in the Pacific Northwest, some species of fish and wildlife continue to decline. Reasons for the lack of success include: different groups have different values and priorities, there is no clear scientific answer, and there are conflicting directives and jurisdictions. The absence of a comprehensive and coordinated planning approach has caused inefficiencies in implementation of mitigation and recovery efforts, as well as their funding. On behalf of the Federal Columbia River Power System, BPA funds a large share of the regional efforts. BPA needs a comprehensive and consistent policy to guide the implementation and funding of its fish and wildlife mitigation and recovery efforts. BPA reviewed the many ongoing processes, identified key issues, and developed alternative policy directions based on alternatives developed by existing initiatives in the region. BPA examined five alternative Policy Directions (Natural Focus, Weak Stock Focus, Sustainable Use, Strong Stock Focus, and Commerce Focus) in relationship to continuing the Status Quo, or ''no action'', approach. The EIS evaluates the environmental consequences of BPA's implementation and funding of sample actions that could emerge from any of the policy directions. BPA does not intend to unilaterally select a Policy Direction for the region. Instead, this EIS provides an analysis of the full range of regional alternatives so that a timely funding and implementation strategy may proceed regardless of the alternative policy that ultimately is chosen--whether by design or by default. The BPA Administrator's initial decision, as well as future tiered decisions, will rely on the environmental analysis and the comparison of the alternatives against the purposes for action. The decisions will consider BPA's fish and wildlife responsibilities, as well as the agency's business responsibilities as a Federal Power Marketing Agency and its responsibility to provide

  8. Conservation Action Handbook.

    ERIC Educational Resources Information Center

    National Rifle Association, Washington, DC.

    Conservation problems are identified, with some suggestions for action. General areas covered are: Wildlife Conservation, Soil Conservation, Clean Water, Air Pollution Action, and Outdoor Recreation Action. Appendices list private organizations or agencies concerned with natural resource use and/or management, congressional committees considering…

  9. To prohibit the Central Intelligence Agency from using an unmanned aerial vehicle to carry out a weapons strike or other deliberately lethal action and to transfer the authority to conduct such strikes or lethal action to the Department of Defense.

    THOMAS, 113th Congress

    Rep. Burgess, Michael C. [R-TX-26

    2014-02-11

    02/11/2014 Referred to the Committee on Intelligence (Permanent Select), and in addition to the Committee on Armed Services, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee... (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  10. 77 FR 5255 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-02

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  11. 76 FR 10900 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  12. 78 FR 68463 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB Review; Comment Request AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted below to...

  13. 78 FR 50432 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB Review; Comment Request AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted below to...

  14. 78 FR 50430 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB Review; Comment Request AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted below to...

  15. 78 FR 40157 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB Review; Comment Request AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted below to...

  16. 78 FR 50433 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB Review; Comment Request AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted below to...

  17. 78 FR 16519 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB Review; Comment Request AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted below to...

  18. 78 FR 69099 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB Review; Comment Request AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted below to...

  19. 75 FR 16134 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  20. 75 FR 67366 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  1. 78 FR 73541 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  2. 78 FR 22266 - Agency Information Collection Activities; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities; Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  3. 78 FR 53465 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency, as part of its continuing effort to reduce paperwork and respondent...

  4. 78 FR 47329 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency, as part of its continuing effort to reduce paperwork and respondent...

  5. 75 FR 52770 - Agency Information Collection Activities: Proposed Collection; Comment Request, 1660-0047...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ..., Business Management Division, Federal Emergency Management Agency, (202) 646-4180 for additional... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Proposed Collection... Federal Disaster Operations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice;...

  6. 78 FR 38979 - Agency Information Collection Activities; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities; Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  7. 76 FR 38397 - Agency Information Collection Activities; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities; Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  8. 76 FR 57048 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  9. 78 FR 57157 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  10. 76 FR 46828 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB... AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice; 30-day notice and request for comments... for Continued Temporary Housing Assistance). SUMMARY: The Federal Emergency Management Agency...

  11. Metacognition of Agency

    ERIC Educational Resources Information Center

    Metcalfe, Janet; Greene, Matthew Jason

    2007-01-01

    The feeling that we are agents, intentionally making things happen by our own actions, is foundational to our understanding of ourselves as humans. People's metacognitions of agency were investigated in 4 experiments. Participants played a game in which they tried to touch downward scrolling Xs and avoid touching Os. Variables that affected…

  12. Bonneville Powerhouse 2 3D CFD for the Behavioral Guidance System

    SciTech Connect

    Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.

    2010-02-01

    In 2008 and 2009, a 700 ft long, 10-ft deep floating forebay guidance wall called a behavioral guidance structure (BGS) was deployed in the Bonneville Powerhouse 2 forebay. The US Army Corps of Engineers, Portland District (CENWP) contracted with the Pacific Northwest National Laboratory (PNNL) to develop computational tools to assess the impact of the BGS on forebay hydraulics (this study). The tools developed here to provide a characterization of forebay hydraulics to be integrated with acoustic telemetry studies designed to measure the impact on juvenile salmon guidance and survival through Bonneville Powerhouse 2. In previous work, PNNL performed computational fluid dynamics (CFD) studies for the Bonneville forebay for CENWP. In this study, the existing model was modified to include the BGS. The model included a bay-by-bay spillway, a truncated Powerhouse 1 forebay, Powerhouse 2 turbine intakes and corner collector, and the forebay bathymetry extending approximately 1.5km upstream from the tip of Cascade Island. Model validation outcomes were similar to that of past studies. Additional checks were included on the impact of the differencing scheme to flow solution. It was found that using upwind differencing was adequate and it was possible to use a truncated computational mesh of this model that included a BGS upstream of Powerhouse 2 and increased spatial resolution in the vicinity of the BGS. This model has been validated, run, and provided to CENWP to use for additional analysis of the Powerhouse 2 forebay hydraulics. The PNNL particle tracking software (PT6) was used to assess the impacts of mass and relative buoyancy on particle fate. The particle tracker was run for the Half Load case for the clean forebay and for the forebay with the BGS in place and the Corner Collector on. All tracker cases showed that the BGS moved the particles across the forebay increasing the number of particles exiting the model through the Corner Collector and (for streamlines

  13. 76 FR 6471 - Agency Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... COMMISSION Agency Information Collection Activities AGENCY: Equal Employment Opportunity Commission. ACTION: Notice of Information Collection --Extension Without Change: Local Union Report (EEO-3). SUMMARY: In... will be posted without change, including any personal information you provide. Copies of...

  14. 77 FR 65548 - Agency Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... revision to the previously approved EEO-5 under the PRA's emergency processing procedures. 77 FR 39238... COMMISSION Agency Information Collection Activities AGENCY: Equal Employment Opportunity Commission. ACTION: Notice of Information Collection--Extension Without Change: Elementary-Secondary Staff Information...

  15. 76 FR 6470 - Agency Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... COMMISSION Agency Information Collection Activities AGENCY: Equal Employment Opportunity Commission. ACTION: Notice of Information Collection--Request For An Extension Without Change: State and Local Government Information Report (EEO-4). SUMMARY: In accordance with the Paperwork Reduction Act, the Equal...

  16. 78 FR 11175 - Agency Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... COMMISSION Agency Information Collection Activities AGENCY: Equal Employment Opportunity Commission. ACTION: Notice of Information Collection--Revised: Demographic Information on Applicants for Federal Employment... (Demographic Information on Applicants, OMB No. 3046-0046) to include disability status data. DATES:...

  17. 76 FR 6470 - Agency Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... OPPORTUNITY COMMISSION Agency Information Collection Activities AGENCY: Equal Employment Opportunity Commission. ACTION: Notice of Information Collection--Extension Without Change: Elementary-Secondary Staff Information Report (EEO-5). SUMMARY: In accordance with the Paperwork Reduction Act, the Equal...

  18. Uranium-bearing coal and carbonaceous rocks in the Fall Creek area, Bonneville County, Idaho

    USGS Publications Warehouse

    Vine, James D.; Moore, George Winfred

    1952-01-01

    Uraniferous coal, carbonaceous shale, and carbonaceous limestone occur in the Bear River formation of Early Cretaceous age at the Fall Creek prospect, in the Fall Creek area, Bonneville County, Idaho. The uranium compounds are believed to have been derived from mildly radioactive silicic volcanic rocks of Tertiary age that rest unconformably on all older rocks and once overlay the Bear River formation and its coal. Meteoric water, percolating downward through the silicic volcanic rocks and into the older rocks along joints and faults, is believed to have brought the uranium compounds into contact with the coal and carbonaceous rocks in which the uranium was absorbed.

  19. Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

    2009-12-28

    This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

  20. Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

    2008-12-01

    The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

  1. Supplement Analysis for the Transmission System Vegetation Management Program FEIS, North Bonneville-Midway and Hanvor-Ostrander (DOE/EIS-0285/SA-63)

    SciTech Connect

    Walasavage, Frederick J.

    2002-04-22

    Vegetation Management on the North Bonneville-Midway and Hanford-Ostrander transmission line right-of-way (approx. 702 acres). The project area begins at the North Bonneville Substation and terminates at structure 25/3+500. For most of the length of the right-of-way, the width is 300 feet wide on the North Bonneville-Midway Line and 150 feet wide for the Hanford-Ostrander Line. BPA proposes to clear unwanted vegetation from the rights of way and access roads on approximately 702 acres on the North Bonneville-Midway and Hanford-Ostrander transmission lines beginning May 2002, and ending August 2002.

  2. Late Pleistocene Hansel Valley basaltic ash, northern Lake Bonneville, Utah, USA

    USGS Publications Warehouse

    Miller, D.M.; Oviatt, Charles G.; Nash, B.P.

    2008-01-01

    The Hansel Valley ash bed lies within 5 cm of the base of deposits of Lake Bonneville (???28 ka) in the vicinity of Great Salt Lake and provides a useful stratigraphic marker for this area of the lake basin. However, it has not been matched to an eruptive edifice, presumably because such an edifice was eroded by waves of Lake Bonneville. We present data for the chemical composition of the tephra and for possible matching lavas and tephras of the region, as well as grain size data for the tephra in an attempt to identify the location of the eruption. Matches with other tephras are negative, but lavas near the coarsest ash deposits match well with the distinctive high values of TiO2 and P2O5 of the ash. Neither chemistry nor grain size data points uniquely to a source area, but an area near the northwest shore of Great Salt Lake and within Curlew Valley is most likely. The Hansel Valley ash is an example of an ash that has no direct numerical date from proximal deposits, despite considerable study, yet nonetheless is useful for stratigraphic studies by virtue of its known stratigraphic position and approximate age. Basaltic tephras commonly are not as widespread as their rhyolitic counterparts, and in some cases apparently are produced by eruptive sources that are short lived and whose edifices are not persistent. ?? 2007 Elsevier Ltd and INQUA.

  3. Investigation of Salt Loss from the Bonneville Salt Flats, Northwestern Utah

    USGS Publications Warehouse

    Mason, James L.; Kipp, Kenneth L.

    1997-01-01

    The Bonneville Salt Flats study area is located in the western part of the Great Salt Lake Desert in northwestern Utah, about 110 miles west of Salt Lake City. The salt crust covers about 50 square miles, but the extent varies yearly as a result of salt being dissolved by the formation and movement of surface ponds during the winter and redeposited with the evaporation of these ponds during the summer. A decrease in thickness and extent of the salt crust on the Bonneville Salt Flats has been documented during 1960-88 (S. Brooks, Bureau of Land Management, written commun., 1989). Maximum salt-crust thickness was 7 feet in 1960 and 5.5 feet in 1988. No definitive data are available to identify and quantify the processes that cause salt loss. More than 55 million tons of salt are estimated to have been lost from the salt crust during the 28-year period. The Bureau of Land Management needs to know the causes of salt loss to make appropriate management decisions.

  4. Constraining paleotemperature and water isotope signals at Lake Bonneville using carbonate clumped isotopes

    NASA Astrophysics Data System (ADS)

    Mering, J. A.; Oviatt, C. G.; Petryshyn, V. A.; Canet, J.; Tripati, A.

    2013-12-01

    Lake Bonneville was the largest pluvial system in the Great Basin during the Last Glacial Maximum (23-19 ka BP), reaching nearly 50,000 square kilometers at its high stand. Carbonate clumped isotope paleothermometry provides a new avenue to evaluate lake and atmospheric conditions by constraining the temperature and oxygen isotope ratios of lake water. Here, we present estimates of lake temperature, the oxygen isotope composition of paleowater, and Mean Annual Air Temperature (MAAT) from LGM paleoshoreline sites in Utah and Eastern Nevada. Multiple phases of ancient carbonate were evaluated, including endogenic carbonate from the ubiquitous Bonneville marl stratigraphic unit, and aragonitic shells of two species of aquatic gastropods (genera Pyrgulopsis and Stagnicola) collected from littoral deposits adjacent to the marl. These phases should record surface water conditions. Preliminary results indicate that paleotemperature estimates from gastropods and marl are similar at any given site. However, the latitudinal water isotope gradient reconstructed using marls is steeper than that reconstructed from gastropods, indicating that perhaps carbonate precipitation in marl is more evaporation-driven than shell growth of aquatic snails. Comparison with recent climate data, and clumped isotope measurements of modern samples from the Great Salt Lake, supports moderate temperature change in the Great Basin from the Last Glacial Maximum to present.

  5. Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009

    SciTech Connect

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

    2011-03-01

    Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  6. 78 FR 27044 - Agency Organization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... FR 33165 (June 15, 2007). Table of Contents I. Background II. Changes to Part 3002 III. Effective... 39 CFR Part 3002 Agency Organization AGENCY: Postal Regulatory Commission. ACTION: Final rule..., seal, and individual office components. This rule reflects changes to the Commission's...

  7. Assessment of Fluctuating Reservoir Elevations Using Hydraulic Models and Impacts to Larval Pacific Lamprey Rearing Habitat in the Bonneville Pool

    SciTech Connect

    Mueller, Robert P.; Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.

    2015-02-24

    This report presents the results of a modeling assessment of likely lamprey larval habitat that may be impacted by dewatering of the major tributary delta regions in the Bonneville Pool of the Columbia River. This assessment was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (CENWP). The goal of the study was to provide baseline data about how the regions of interest would potentially be impacted at three river flows (10, 50, and 90 percent exceedance flow) for four different forebay elevations at Bonneville Dam. Impacts of unsteady flows at The Dalles Dam and changing forebay elevation at Bonneville Dam for a 2-week period were also assessed. The area of dewatered regions was calculated by importing modeled data outputs into a GIS and then calculating the change in inundated area near tributary deltas for the four Bonneville forebay surface elevations. From the modeled output we determined that the overall change in area is less sensitive to elevations changes during higher river discharges. Changing the forebay elevation at Bonneville and the resulting impact to total dewatered regions was greater at the lowest modeled river flow (97 kcfs) and showed the greatest variation at the White Salmon/Hood River delta regions followed by the Wind, Klickitat and the Little White Salmon rivers. To understand how inundation might change on a daily and hourly basis. Unsteady flow models were run for a 2-week period in 2002 and compared to 2014. The water surface elevation in the upstream pool closely follows that of the Bonneville Dam forebay with rapid changes of 1 to 2-ft possible. The data shows that 2.5-ft variation in water surface elevation occurred during this period in 2002 and a 3.7-ft change occurred in 2014. The duration of these changes were highly variable and generally did not stay constant for more than a 5-hr period.

  8. Evaluation of the Fish Passage Effectiveness of the Bonneville I Prototype Surface Collector using Three-Dimensional Ultrasonic Fish Tracking

    SciTech Connect

    Faber, Derrek M; Weiland, Mark A; Moursund, Robert; Carlson, Thomas J

    2001-05-01

    This report describes tests conducted at Bonneville Dam on the Columbia River in the spring of 2000 using three-dimensional acoustic telemetry and computational fluid dynamics hydraulic modeling to observe the response of outmigrating juvenile steelhead and yearling chinook to a prototype surface collector installed at the Powerhouse. The study described in this report was one of several conducted for the U.S. Army Corps of Engineers to prepare a decision document on which of two bypass methods: surface flow bypass or extended-length submersible bar screens to use to help smolts pass around Bonneville dams without going through the turbines.

  9. Monitoring and Evaluation of the Prototype Surface Collector at Bonneville First Powerhouse in 2000: Synthesis of Results

    SciTech Connect

    Carlson, Thomas J

    2001-06-01

    This report describes research done to evaluate the Prototype Surface Collector at Bonneville Dam, Powerhouse I, on the Columbia River. The surface collector is being evaluated as a means for bringing downstream migrating salmon and steelhead through the powerhouse while avoiding the turbines. The report describes evaluations conducted by PNNL, National Marine Fisheries Service, and various contractors using radio telemetry, hydroacoustics, and computational fluid dynamics models. The evaluation will provide information to the U.S. Army Corps of Engineers for their 2001 decision on whether to use surface flow bypass or extended-length submersible bar screens for long-term smolt passage at Bonneville Dam.

  10. 78 FR 18420 - Special Permit Applications Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Pipeline and Hazardous Materials Safety Administration Special Permit Applications Actions AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of actions on special... processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49...

  11. Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects.

    SciTech Connect

    Rasmussen, Larry; Wright, Patrick

    1990-10-01

    The Habitat Evaluation Procedures (HEP) were used to evaluate pre- and post-construction habitat conditions of the US Army Corps of Engineers Bonneville project in Oregon and Washington. The project directly impacted 20,749 acres of wildlife habitat. Seven evaluation species were selected with losses and gains expressed in Habitat Units (HU's). One HU is equivalent to 1 acre of prime habitat. The evaluation estimated a gain of 2671 HU's of lesser scaup wintering habitat. Losses of 4300 HU's of great blue heron habitat, 2443 HU's of Canada goose habitat, 2767 HU's of spotted sandpiper habitat, 163 HU's of yellow warbler habitat, 1022 HU's black-capped chickadee habitat, and 1622 HU's of mink habitat occurred as a result of the project. This amounts to a total combined loss of 12,317 HU's. 18 refs., 1 fig., 4 tabs.

  12. Synthesis of Biological Reports on Juvenile Fish Passage and Survival at Bonneville Dam through 2005

    SciTech Connect

    Ploskey, Gene R.; Johnson, Gary E.; Giorgi, Albert E.; Johnson, Richard L.; Stevenson, John R.; Schilt, Carl R.; Johnson, Peter N.; Patterson, Deborah S.

    2005-06-01

    This report describes a review of available literature on juvenile salmonid passage at Bonneville Dam from 1939 through 2005. Studies of interest included project-wide fish-passage efficiency (FPE) studies by radio telemetry and fixed-aspect hydroacoustics, fish survival studies (direct and indirect), FGE studies, powerhouse and unit (by netting, hydroacoustics, and radio telemetry), predation studies in the forebay and tailrace, behavioral studies on forebay approach and egress, and surface-bypass studies. The FPE effort will include a review of available distribution data (horizontal, diel, and vertical) for juvenile salmon. This study does not repeat the results of previous review and synthesis studies but cites them. Where no previous review exists for a subject area, all reports were reviewed and synthesized. The report includes an annotated bibliography summarizing each of the documents reviewed and a DVD disk containing all of the original papers and reports along with an HTML index to the documents.

  13. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

    2011-12-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  14. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

    2012-09-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  15. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

    SciTech Connect

    Ploskey, Gene R.; Batten, G.; Cushing, Aaron W.; Kim, Jin A.; Johnson, Gary E.; Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.; Carpenter, Scott M.; Deng, Zhiqun; Etherington, D. J.; Fischer, Eric S.; Fu, Tao; Greiner, Michael J.; Hennen, Matthew J.; Martinez, Jayson J.; Mitchell, T. D.; Rayamajhi, Bishes; Zimmerman, Shon A.

    2013-02-15

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  16. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  17. Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam

    SciTech Connect

    Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

    2009-01-29

    At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

  18. Age and paleoclimatic significance of the Stansbury shoreline of Lake Bonneville, Northeastern Great Basin

    USGS Publications Warehouse

    Oviatt, Charles G.; Currey, D.R.; Miller, D.M.

    1990-01-01

    The Stansbury shoreline, one of the conspicuous late Pleistocene shorelines of Lake Bonneville, consists of tufa-cemented gravel and barrier beaches within a vertical zone of about 45 m, the lower limit of which is 70 m above the modern average level of Great Salt Lake. Stratigraphic evidence at a number of localities, including new evidence from Crater Island on the west side of the Great Salt Lake Desert, shows that the Stansbury shoreline formed during the transgressive phase of late Pleistocene Lake bonneville (sometime between about 22,000 and 20,000 yr B.P.). Tufa-cemented gravel and barrier beaches were deposited in the Stansbury shorezone during one or more fluctuations in water level with a maximum total amplitude of 45 m. We refer to the fluctuations as the Stansbury oscillation. The Stansbury oscillation cannot have been caused by basin-hypsometric factors, such as stabilization of lake level at an external overflow threshold or by expansion into an interior subbasin, or by changes in drainage basin size. Therefore, changes in climate must have caused the lake level to reverse its general rise, to drop about 45 m in altitude (reducing its surface area by about 18%, 5000 km2), and later to resume its rise. If the sizes of Great Basin lakes are controlled by the mean position of storm tracks and the jetstream, which as recently postulated may be controlled by the size of the continental ice sheets, the Stansbury oscillation may have been caused by a shift in the jetstream during a major interstade of the Laurentide ice sheet. ?? 1990.

  19. Fish remains from Homestead Cave and lake levels of the past 13,000 years in the Bonneville basin

    USGS Publications Warehouse

    Broughton, J.M.; Madsen, D.B.; Quade, Jay

    2000-01-01

    A late Quaternary ichthyofauna from Homestead Cave, Utah, provides a new source of information on lake history in the Bonneville basin. The fish, represented by 11 freshwater species, were accumulated between ~11,200 and ~1000 14C yr B.P. by scavenging owls. The 87Sr/86Sr ratio of Lake Bonneville varied with its elevation; 87Sr/86Sr values of fish from the lowest stratum of the cave suggest they grew in a lake near the terminal Pleistocene Gilbert shoreline. In the lowest deposits, a decrease in fish size and an increase in species tolerant of higher salinities or temperatures suggest multiple die-offs associated with declining lake levels. An initial, catastrophic, post-Provo die-off occurred at 11,300-11,200 14C yr B.P. and was followed by at least one rebound or recolonization of fish populations, but fish were gone from Lake Bonneville sometime before ~10,400 14C yr B.P. This evidence is inconsistent with previous inferences of a near desiccation of Lake Bonneville between 13,000 and 12,000 14C yr B.P. Peaks in Gila atraria frequencies in the upper strata suggest the Great Salt Lake had highstands at ~3400 and ~1000 14C yr B.P. (C) 2000 University of Washington.

  20. Idaho Model Watershed Project : Annual Report to the Bonneville Power Administration January 1, 1997 - December 31, 1997.

    SciTech Connect

    Bradbury, Allen; Slavin, Katie

    1998-10-28

    The Model Watershed Project was initiated in the fall of 1992 with a grant from Bonneville Power Administration. The objective of this project is to protect, enhance and restore anadromous and resident fish habitat and achieve and maintain a balance between resource protection and resource use on a holistic watershed basis.

  1. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    SciTech Connect

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-07

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  2. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    SciTech Connect

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-03-01

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  3. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Agency plan. 720.304 Section 720.304...) AFFIRMATIVE EMPLOYMENT PROGRAMS Disabled Veterans Affirmative Action Program § 720.304 Agency plan. (a) Plan Development. As part of the affirmative action plan it prepares pursuant to section 501(b) of...

  4. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 2 2012-01-01 2012-01-01 false Agency plan. 720.304 Section 720.304...) AFFIRMATIVE EMPLOYMENT PROGRAMS Disabled Veterans Affirmative Action Program § 720.304 Agency plan. (a) Plan Development. As part of the affirmative action plan it prepares pursuant to section 501(b) of...

  5. 49 CFR 659.37 - Corrective action plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... identified causal and contributing factors are determined by the rail transit agency or oversight agency as... agency. (b) Each corrective action plan should identify the action to be taken by the rail transit agency... oversight agency must establish a process to resolve disputes between itself and the rail transit...

  6. 49 CFR 659.37 - Corrective action plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... identified causal and contributing factors are determined by the rail transit agency or oversight agency as... agency. (b) Each corrective action plan should identify the action to be taken by the rail transit agency... oversight agency must establish a process to resolve disputes between itself and the rail transit...

  7. 49 CFR 659.37 - Corrective action plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... identified causal and contributing factors are determined by the rail transit agency or oversight agency as... agency. (b) Each corrective action plan should identify the action to be taken by the rail transit agency... oversight agency must establish a process to resolve disputes between itself and the rail transit...

  8. 49 CFR 659.37 - Corrective action plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... identified causal and contributing factors are determined by the rail transit agency or oversight agency as... agency. (b) Each corrective action plan should identify the action to be taken by the rail transit agency... oversight agency must establish a process to resolve disputes between itself and the rail transit...

  9. 49 CFR 659.37 - Corrective action plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... identified causal and contributing factors are determined by the rail transit agency or oversight agency as... agency. (b) Each corrective action plan should identify the action to be taken by the rail transit agency... oversight agency must establish a process to resolve disputes between itself and the rail transit...

  10. 77 FR 13313 - Agency Information Collection Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    .... Energy Information Administration Agency Information Collection Extension AGENCY: U.S. Energy Information Administration (EIA), U.S. Department of Energy. ] ACTION: Agency information collection activities: Information... Price Survey;'' Comments are invited on: (a) Whether the proposed collection of information is...

  11. 76 FR 69251 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy (DOE). ACTION: Notice and request... of information that DOE is developing for submission to the Office of Management and Budget (OMB... collection of information is necessary for the proper performance of the functions of the agency,...

  12. 77 FR 19275 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy, DoE. ACTION: Notice and Request... of information that DOE is developing for submission to the Office of Management and Budget (OMB... collection of information is necessary for the proper performance of the functions of the agency,...

  13. 77 FR 57080 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-17

    ... Information Administration Proposed Agency Information Collection AGENCY: U.S. Energy Information Administration (EIA), U.S. Department of Energy. ACTION: Agency Information Collection Activities: Proposed... 1995. Comments are invited on: (a) Whether the proposed collection of information is necessary for...

  14. 75 FR 42726 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and request for... Management and Budget (OMB) to extend for three years the emergency Information Collection Request Title: OE... of information is necessary for the proper performance of the functions of the agency,...

  15. 75 FR 5304 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    ... the joint Department of Energy and Environmental Protection Web site, http://www.fueleconomy.gov ; (5... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for... is necessary for the proper performance of the functions of the agency, including whether...

  16. 75 FR 12532 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on March 23, 2010, at...

  17. 76 FR 35869 - International Energy Agency meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency meetings AGENCY: Department of Energy, DOE. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on June 28, 2011, at...

  18. 77 FR 61583 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on October 17 and 18,...

  19. 77 FR 69613 - International Energy Agency Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meeting AGENCY: Department of Energy. ACTION: Notice of meeting. SUMMARY: A meeting involving members of the Industry Advisory Board (IAB) to the International Energy Agency (IEA)...

  20. 76 FR 69714 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of Meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on November 16-17,...

  1. 77 FR 16826 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy, DoE. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on March 28 and 29,...

  2. 78 FR 36542 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on June 24, 2013, at...

  3. 78 FR 16665 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on March 25 and 26,...

  4. 77 FR 36271 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on June 26, 2012, at...

  5. 76 FR 14003 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on March 22, 2011, at...

  6. 75 FR 34724 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of Meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on June 29, 2010, at...

  7. 75 FR 67711 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on November 16, 2010,...

  8. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... year. (d) Plan Certification. Each agency must certify to OPM by December 1 of each year that it has an... 5 Administrative Personnel 2 2013-01-01 2013-01-01 false Agency plan. 720.304 Section 720.304...) AFFIRMATIVE EMPLOYMENT PROGRAMS Disabled Veterans Affirmative Action Program § 720.304 Agency plan. (a)...

  9. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... year. (d) Plan Certification. Each agency must certify to OPM by December 1 of each year that it has an... 5 Administrative Personnel 2 2014-01-01 2014-01-01 false Agency plan. 720.304 Section 720.304...) AFFIRMATIVE EMPLOYMENT PROGRAMS Disabled Veterans Affirmative Action Program § 720.304 Agency plan. (a)...

  10. 78 FR 41072 - Agency Information Collection Activities: Proposed Collection; Comment Request.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Proposed Collection; Comment Request. AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The...

  11. 75 FR 47823 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... Services Customer Satisfaction Survey AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice; 30.... 1660-0102; FEMA Form 007-0-1, Federal Emergency Management Agency Housing Inspection Services Customer... Title: Federal Emergency Management Agency Housing Inspection Services Customer Satisfaction...

  12. The 87Sr/86Sr ratios of lacustrine carbonates and lake-level history of the Bonneville paleolake system

    USGS Publications Warehouse

    Hart, W.S.; Quade, Jay; Madsen, D.B.; Kaufman, D.S.; Oviatt, Charles G.

    2004-01-01

    Lakes in the Bonneville basin have fluctuated dramatically in response to changes in rainfall, temperature, and drainage diversion during the Quaternary. We analyzed tufas and shells from shorelines of known ages in order to develop a relation between 87Sr/86Sr ratio of carbonates and lake level, which then can be used as a basis for constraining lake level from similar analyses on carbonates in cores. Carbonates from the late Quaternary shorelines yield the following average 87Sr/86Sr ratios: 0.71173 for the Stansbury shoreline (22-20 14C ka; 1350 m), 0.71153 for the Bonneville shoreline (15.5-14.5 14C ka; 1550 m), 0.71175 for the Provo shoreline (14.4-14.0 14C ka; 1450 m), 0.71244 for the Gilbert shoreline (???10.3-10.9 14C ka; 1300 m), and 0.71469 for the modern Great Salt Lake (1280 m). These analyses show that the 87Sr/86Sr ratio of lacustrine carbonates changes substantially at low- to mid-lake levels but is invariant at mid- to high-lake levels. Sr-isotope mixing models of Great Salt Lake and the Bonneville paleolake system were constructed to explain these variations in 87Sr/86Sr ratios with change in lake level. Our model of the Bonneville system produced a 87Sr/86Sr ratio of 0.71193, very close to the observed ratios from high-shoreline tufa and shell. The model verifies that the integration of the southern Sevier and Beaver rivers with the Bear and others rivers in the north is responsible for the lower 87Sr/86Sr ratios in Lake Bonneville compared to the modern Great Salt Lake. We also modeled the 87Sr/86Sr ratio of Lake Bonneville with the upper Bear River diverted into the Snake River basin and obtained an 87Sr/86Sr ratio of 0.71414. Coincidentally, this ratio is close to the observed ratio for Great Salt Lake of 0.71469. This means that 87Sr/86Sr ratios of >0.714 for carbonate can be produced by climatically induced low-lake conditions or by diversion of the upper Bear River out of the Bonneville basin. This model result also demonstrates that the

  13. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  14. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA`s Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  15. Bonneville Second Powerhouse Tailrace and High Flow Outfall: ADCP and drogue release field study

    SciTech Connect

    Cook, Christopher B.; Richmond, Marshall C.; Guensch, Gregory R.

    2001-03-20

    The Bonneville Project is one of four US Army Corps of Engineers operated dams along the Lower Columbia River. Each year thousands of smelt pass through this Project on their way to the Pacific Ocean. High flow outfalls, if specifically designed for fish passage, are thought to have as good or better smelt survival rates as spillways. To better understand the hydrodynamic flow field around an operating outfall, the Corps of Engineers commissioned measurement of water velocities in the tailrace of the Second Powerhouse. These data also are necessary for proper calibration and verification of three-dimensional numerical models currently under development at PNNL. Hydrodynamic characterization of the tailrace with and without the outfall operating was accomplished through use of a surface drogue and acoustic Doppler current profiler (ADCP). Both the ADCP and drogue were linked to a GPS (global positioning system); locating the data in both space and time. Measurements focused on the area nearest to the high flow outfall, however several ADCP transects and drogue releases were performed away from the outfall to document ambient flow field conditions when the outfall was not operating.

  16. Tradeoffs for Efficiently Passing Juvenile Salmonids through Bonneville Dam on the Lower Columbia River

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Kim, Jina

    2008-12-01

    We analyzed five years of route-specific fish-passage data acquired by fixed-aspect hydroacoustic sampling of juvenile salmonids passing downstream through Bonneville Dam. High passage effectiveness of surface-flow outlets relative to the spillway and turbines suggests that juvenile salmonids are preferentially selecting surface outlets over adjacent turbines. Seasonal estimates showed that median combined effectiveness of surface-flow outlets (7.8) was 7.1 times higher than that of the spillway (1.1) and 9.8 times higher than that of turbines (0.8). Islands prevent the spillway from attracting fish from either powerhouse, something that may occur at other projects. Regressions indicated that percent flow passing a specific route explained from 50 to 97% of fish-passage variation, and relations were useful for evaluating fish-passage alternatives. Fitted curves for surface-passage routes, including the sluiceway at Powerhouse 1 (B1) and Powerhouse 2 (B2) were much steeper at low percent low (2-15%) than were curves for the spillway or turbines. Regressions indicate that increasing surface-flow percentages of B1 flow from 1% to 10% could increase B1 sluiceway-passage efficiency from 40% to 83%. Increasing B2 flow to the B2 sluiceway from 4% to 15% could increase fish passage from 31% to 62%. Without spill, about 50% of fish passed by non-turbine routes.

  17. Water Velocity Measurements on a Vertical Barrier Screen at the Bonneville Dam Second Powerhouse

    SciTech Connect

    Hughes, James S.; Deng, Zhiqun; Weiland, Mark A.; Martinez, Jayson J.; Yuan, Yong

    2011-11-22

    Fish screens at hydroelectric dams help to protect rearing and migrating fish by preventing them from passing through the turbines and directing them towards the bypass channels by providing a sweeping flow parallel to the screen. However, fish screens may actually be harmful to fish if they become impinged on the surface of the screen or become disoriented due to poor flow conditions near the screen. Recent modifications to the vertical barrier screens (VBS) at the Bonneville Dam second powerhouse (B2) intended to increase the guidance of juvenile salmonids into the juvenile bypass system (JBS) have resulted in high mortality and descaling rates of hatchery subyearling Chinook salmon during the 2008 juvenile salmonid passage season. To investigate the potential cause of the high mortality and descaling rates, an in situ water velocity measurement study was conducted using acoustic Doppler velocimeters (ADV) in the gatewell slot at Units 12A and 14A of B2. From the measurements collected the average approach velocity, sweep velocity, and the root mean square (RMS) value of the velocity fluctuations were calculated. The approach velocities measured across the face of the VBS varied but were mostly less than 0.3 m/s. The sweep velocities also showed large variances across the face of the VBS with most measurements being less than 1.5 m/s. This study revealed that the approach velocities exceeded criteria recommended by NOAA Fisheries and Washington State Department of Fish and Wildlife intended to improve fish passage conditions.

  18. Hydrology and surface morphology of the Bonneville Salt Flats and Pilot Valley Playa, Utah

    USGS Publications Warehouse

    Lines, Gregory C.

    1979-01-01

    The Bonneville Salt Flats and Pilot Valley are in the western part of the Great Salt Lake Desert in northwest Utah. The areas are separate, though similar, hydrologic basins, and both contain a salt crust. The Bonneville salt crust covered about 40 square miles in the fall of 1976, and the salt crust in Pilot Valley covered 7 square miles. Both areas lack any noticeable surface relief (in 1976, 1.3 feet on the Bonneville salt crust and 0.3 foot on the Pilot Valley salt crust). The salt crust on the Salt Flats has been used for many years for automobile racing, and brines from shallow lacustrine deposits have been used for the production of potash. In recent years, there has been an apparent conflict between these two major uses of the area as the salt crust has diminished in both thickness and extent. Much of the Bonneville Racetrack has become rougher, and there has also been an increase in the amount of sediment on the south end of the racetrack. The Pilot Valley salt crust and surrounding playa have been largely unused. Evaporite minerals on the Salt Flats and the Pilot Valley playa are concentrated in three zones: (1) a carbonate zone composed mainly of authigenic clay-size carbonate minerals, (2) a sulfate zone composed mainly of authigenic gypsum, and (3) a chloride zone composed of crystalline halite (the salt crust). Five major types of salt crust were recognized on the Salt Flats, but only one type was observed in Pilot Valley. Geomorphic differences in the salt crust are caused by differences in their hydrologic environments. The salt crusts are dynamic features that are subject to change because of climatic factors and man's activities. Ground water occurs in three distinct aquifers in much of the western Great Salt Lake Desert: (1) the basin-fill aquifer, which yields water from conglomerate in the lower part of the basin fill, (2) the alluvial-fan aquifer, which yields water from sand and gravel along the western margins of both playas, and (3) the

  19. City of North Bonneville, Washington: Geothermal Exploration Project, production test well, Phase II. Final report

    SciTech Connect

    Not Available

    1982-06-01

    Based on discussions with the City of North Bonneville, the production test well was drilled to a depth that would also explore for ground water temperatures near 130/sup 0/F (54.4/sup 0/C). Depth projections to a 130/sup 0/F bottom hole temperature were made by assuming a constant ground water temperature rise greater than 50/sup 0/C per kilometer, and by assuming that essentially homogeneous or equivalent conductive rock units would be encountered. Minimum water production requirements were not set, although the City determined that about 800 gpm would be acceptable. Large upper casing diameters of 16 and 12 inches were installed in order to provide the future use of either a vertical turbine or submersible pump, as desired by the city. The scope of work included interpretation of well characteristics, evaluation of ground water as a geothermal resource, geologic analysis of data from drilling and testing, drilling supervision, daily drilling cost accounting, and preparation of a final report. The report includes geologic evaluation of the drilling and test data, ground water and geothermal potential.

  20. Evaluation of Juvenile Salmon Behavior at Bonneville Dam, Columbia River, Using a Multibeam Technique

    SciTech Connect

    Johnson, Robert L. ); Moursund, Russell A. )

    1999-11-01

    In recent years, with increased effort to bypass and guide fragile stocks of juvenile salmon in the Columbia Basin past hydroelectric projects, it has been increasingly important to obtain fine-scale fish behavior data in a non-intrusive manner. The Dual-Head Multibeam Sonar is an emerging technology for fisheries applications that addresses that requirement. It has two principal advantages over traditional hydroacoustic techniques: (1) it allows for simultaneous large-volume coverage of a region of interest, and (2) it affords 3-D tracking capability. The use of Dual-Head Multibeam Sonar in this study resulted in unprecedented insight into fine-scale smolt behavior upstream of a prototype surface collector at Bonneville Dam first powerhouse in 1998. Our results indicated that outmigrant juvenile salmon had an increased likelihood of milling or holding. This discovery will lead to better design criteria for future bypass and collector systems. Future fisheries multibeam sonar systems will likely be fully integrated systems with built-in real time tracking capability. These systems may be used to track targets relative to physical guidance structures or other behavior modifying stimuli such as light, turbulent flow, electrical/magnetic fields, or low-frequency sound and vibration. The combination of fine-scale fish behavior data and environmental parameters will yield better design criteria for the safe passage of listed or endangered species of Pacific salmon.

  1. Stratigraphy and chronology of offshore to nearshore deposits associated with the Provo shoreline, Pleistocene Lake Bonneville, Utah

    USGS Publications Warehouse

    Godsey, H.S.; Oviatt, Charles G.; Miller, D.M.; Chan, M.A.

    2011-01-01

    Stratigraphic descriptions and radiocarbon data from eleven field locations are presented in this paper to establish a chronostratigraphic framework for offshore to nearshore deposits of Lake Bonneville. Based on key marker beds and geomorphic position, the deposits are interpreted to have accumulated during the period from the late transgressive phase, through the overflowing phase, into the regressive phase of the lake. Radiocarbon ages of sediments associated with the Provo shoreline indicate that Lake Bonneville dropped rapidly from the Provo shoreline at about 12,600 14C yr BP (15,000 cal yr B.P.). The presence of one or more sand beds in the upper part of the Provo-aged marl indicates rapid lowering of lake level or storm events at the end of the Provo episode. An accurate understanding of the timing and nature of Lake Bonneville's climate-driven regression from the Provo shoreline is critical to correlations with records of regional and hemispheric climate change. The rapid descent of the lake from the Provo shoreline correlates with the decline of Lakes Lahontan and Estancia, and with the onset of the B??lling-Aller??d warming event. ?? 2011 Elsevier B.V.

  2. 32 CFR 1908.35 - Action by appeals authority.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 1908.35 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY... EXECUTIVE ORDER 12958 Agency Action on Mdr Appeals § 1908.35 Action by appeals authority. (a) Action by Agency Release Panel. The Coordinator, in his or her capacity as Executive Secretary of the...

  3. 32 CFR 1908.35 - Action by appeals authority.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 1908.35 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY... EXECUTIVE ORDER 12958 Agency Action on Mdr Appeals § 1908.35 Action by appeals authority. (a) Action by Agency Release Panel. The Coordinator, in his or her capacity as Executive Secretary of the...

  4. Bypass system modification at Bonneville Dam on the Columbia River improved the survival of juvenile salmon

    USGS Publications Warehouse

    Ferguson, J.W.; Sandford, B.P.; Reagan, R.E.; Gilbreath, L.G.; Meyer, E.B.; Ledgerwood, R.D.; Adams, N.S.

    2007-01-01

    From 1987 to 1992, we evaluated a fish bypass system at Bonneville Dam Powerhouse 2 on the Columbia River. The survival of subyearling Chinook salmon Oncorhynchus tshawytscha released into the system ranged from 0.774 to 0.911 and was significantly lower than the survival of test fish released into turbines and the area immediately below the powerhouse where bypass system flow reentered the river. Yearling and subyearling Chinook salmon and yearling coho salmon O. kisutch released into the bypass system were injured or descaled. Also, levels of blood plasma cortisol and lactate were significantly higher in yearling and subyearling Chinook salmon that passed through the bypass system than in fish released directly into a net located over the bypass exit. This original system was then extensively modified using updated design criteria, and the site where juvenile fish reentered the river was relocated 2.8 km further downstream to reduce predation on bypassed fish by northern pikeminnow Ptychocheilus oregonensis. Based on studies conducted from 1999 to 2001, the new bypass system resulted in high fish survival, virtually no injuries to fish, fish passage times that were generally similar to water travel times, and mild stress responses from which fish recovered quickly. The mean estimated survival of subyearling Chinook salmon passing through the new bypass system was 0.946 in 2001, which was an usually low-flow year. Survival, physical condition, passage timing, and blood physiological indicators of stress were all useful metrics for assessing the performance of both bypass systems and are discussed. The engineering and hydraulic criteria used to design the new bypass system that resulted in improved fish passage conditions are described.

  5. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2004-2005 Annual Report.

    SciTech Connect

    van der Naald, Wayne; Duff, Cameron; Friesen, Thomas A.

    2006-02-01

    Pacific salmon Oncorhynchus spp. populations have declined over the last century due to a variety of human impacts. Chum salmon O. keta populations in the Columbia River have remained severely depressed for the past several decades, while upriver bright (URB) fall Chinook salmon O. tschawytscha populations have maintained relatively healthy levels. For the past seven years we have collected data on adult spawning and juvenile emergence and outmigration of URB fall Chinook and chum salmon populations in the Ives and Pierce islands complex below Bonneville Dam. In 2004, we estimated 1,733 fall Chinook salmon and 336 chum salmon spawned in our study area. Fall Chinook salmon spawning peaked 19 November with 337 redds and chum salmon spawning peaked 3 December with 148 redds. Biological characteristics continue to suggest chum salmon in our study area are similar to nearby stocks in Hardy and Hamilton creeks, and Chinook salmon we observe are similar to upriver bright stocks. Temperature data indicated that 2004 brood URB fall Chinook salmon emergence began on 6 January and ended 27 May 2005, with peak emergence occurring 12 March. Chum salmon emergence began 4 February and continued through 2 May 2005, with peak emergence occurring on 21 March. Between 13 January and 28 June, we sampled 28,984 juvenile Chinook salmon and 1,909 juvenile chum salmon. We also released 32,642 fin-marked and coded-wire tagged juvenile fall Chinook salmon to assess survival. The peak catch of juvenile fall Chinook salmon occurred on 18 April. Our results suggested that the majority of fall Chinook salmon outmigrate during late May and early June, at 70-80 mm fork length (FL). The peak catch of juvenile chum salmon occurred 25 March. Juvenile chum salmon appeared to outmigrate at 40-55 mm FL. Outmigration of chum salmon peaked in March but extended into April and May.

  6. 78 FR 25853 - Defense Logistics Agency Privacy Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... of the Secretary 32 CFR Part 323 RIN 0790-AI86 Defense Logistics Agency Privacy Program AGENCY: Defense Logistics Agency, DoD. ACTION: Final rule. SUMMARY: The Defense Logistics Agency (DLA) is revising... INFORMATION: The proposed rule was published on August 6, 2012 (77 FR 46653). No comments were...

  7. 75 FR 9588 - Defense Intelligence Agency Advisory Board; Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... Office of the Secretary Defense Intelligence Agency Advisory Board; Closed Meeting AGENCY: Defense Intelligence Agency, DoD. ACTION: Notice of closed meeting. SUMMARY: Pursuant to the provisions of subsection... hereby given that the Defense Intelligence Agency Advisory Board, will meet on March 22 and 23, 2010....

  8. The Many Faces of Agency

    ERIC Educational Resources Information Center

    Doyle, Walter

    2015-01-01

    This forum article is a response to the article by Alandeom W. Oliveira, Patterson Rogers, Cassie F. Quigley, Denis Sambursky, Kimberly Barss, and Seema Rivera, The article explores agency from the perspective of both personal action and an understanding of causality within environmental systems, and it explores environmental read-alouds as…

  9. 75 FR 8999 - Agency Information Collection Activities: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... From the Federal Register Online via the Government Publishing Office NATIONAL SCIENCE FOUNDATION Agency Information Collection Activities: Comment Request AGENCY: National Science Foundation. ACTION... Register at 74 FR 68637 and one comment was received regarding the materials provided. NSF is...

  10. 77 FR 56236 - Agency Information Collection Activities: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-12

    ... FOUNDATION Agency Information Collection Activities: Comment Request AGENCY: National Science Foundation. ACTION: Submission for OMB Review; Comment Request. SUMMARY: The National Science Foundation (NSF) has... Information and Regulatory Affairs of OMB, Attention: Desk Officer for National Science Foundation,...

  11. 78 FR 59727 - Agency Information Collection Activities: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... From the Federal Register Online via the Government Publishing Office NATIONAL SCIENCE FOUNDATION Agency Information Collection Activities: Comment Request AGENCY: National Science Foundation. ACTION: Submission for OMB review; comment request. SUMMARY: The National Science Foundation (NSF) has submitted...

  12. 78 FR 43941 - Agency Information Collection Activities: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ... From the Federal Register Online via the Government Publishing Office NATIONAL SCIENCE FOUNDATION Agency Information Collection Activities: Comment Request AGENCY: National Science Foundation. ACTION: Submission for OMB Review; Comment Request. SUMMARY: The National Science Foundation (NSF) has submitted...

  13. 75 FR 48730 - Agency Information Collection Activities: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... From the Federal Register Online via the Government Publishing Office NATIONAL SCIENCE FOUNDATION Agency Information Collection Activities: Comment Request AGENCY: National Science Foundation. ACTION: Submission for OMB Review; Comment Request. SUMMARY: The National Science Foundation (NSF) has submitted...

  14. 78 FR 62417 - Import Administration; Change of Agency Name

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... International Trade Administration 19 CFR Parts 351, 354, and 356 RIN 0625-AA97 Import Administration; Change of Agency Name AGENCY: Import Administration, International Trade Administration, Commerce. ACTION: Final...), through internal department organizational orders, changed the name of ``Import Administration''...

  15. 77 FR 19361 - Agency Information Collection Activities: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... From the Federal Register Online via the Government Publishing Office NATIONAL SCIENCE FOUNDATION Agency Information Collection Activities: Comment Request AGENCY: National Science Foundation. ACTION: Submission for OMB review; comment request. SUMMARY: The National Science Foundation (NSF) has submitted...

  16. 76 FR 27093 - Agency Information Collection Activities: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... From the Federal Register Online via the Government Publishing Office NATIONAL SCIENCE FOUNDATION Agency Information Collection Activities: Comment Request AGENCY: National Science Foundation. ACTION: Submission for OMB Review; Comment Request. SUMMARY: The National Science Foundation (NSF) has submitted...

  17. 78 FR 41805 - Agency Information Collection Activities: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... From the Federal Register Online via the Government Publishing Office NATIONAL SCIENCE FOUNDATION Agency Information Collection Activities: Comment Request AGENCY: National Science Foundation. ACTION: Submission for OMB review; comment request. SUMMARY: The National Science Foundation (NSF) has submitted...

  18. 77 FR 65908 - Agency Information Collection Activities: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Agency Information Collection Activities: Comment Request AGENCY: National Science Foundation. ACTION.... SUPPLEMENTARY INFORMATION: Title of Collection: Monitoring for the National Science Foundation's Math and... and/or science educational practices in both higher education institutions and in schools and...

  19. 75 FR 4876 - Agency Information Collection Activities: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... From the Federal Register Online via the Government Publishing Office NATIONAL SCIENCE FOUNDATION Agency Information Collection Activities: Comment Request AGENCY: National Science Foundation. ACTION: Notice. SUMMARY: The National Science Foundation (NSF) is announcing plans to request clearance for...

  20. 77 FR 61472 - Agency Information Collection Activities; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-09

    ... CONTACT: Ms. Janet Wylie, Office of Planning and Administration, RPD-3, Federal Railroad Administration... Federal Railroad Administration Agency Information Collection Activities; Comment Request AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Notice and request for...

  1. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville, The Dalles, John Day, and McNary Dams; 2001-2002 Annual Report.

    SciTech Connect

    van der Naald, Wayne; Clark, Roy; Spellman, Bryant

    2003-04-01

    In 2001 a total of 309 adult fall chinook and 264 chum were sampled in the Ives and Pierce islands area below Bonneville Dam. The peak redd count for fall chinook was 48. The peak redd count for chum was 181. Peak spawning time for fall chinook was set at approximately 16 November. Peak spawning time for chum occurred approximately 26 November. There were estimated to be a total of 721 fall chinook spawning below Bonneville Dam in 2001. The 2001 chum population below Bonneville Dam was estimated to be 532 spawning fish. Temperature unit data suggests that below Bonneville Dam 2001 brood chinook emergence began on 11 March 2002 and ended 18 May 2002, with peak emergence occurring 26 April. 2001 brood juvenile chum emergence below Bonneville Dam began 29 January and continued through 31 March 2002. Peak chum emergence took place 25 February. A total of 5,487 juvenile chinook and 678 juvenile chum were sampled between the dates of 22 January and 30 July 2002 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place from mid June through early July 2002 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, GSI analysis, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2001 and 2002 the majority of fall chinook using the area below Bonneville Dam were of a late-spawning bright stock of fall chinook. Observed spawning times, adult age and sex composition, GSI analysis, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration

  2. 75 FR 81650 - Agency Information Collection Activities:

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... Bureau of Alcohol, Tobacco, Firearms, and Explosives Agency Information Collection Activities: Proposed Collection; Comments Requested ACTION: 30-Day Notice of Information Collection Under Review: Open Letter to...), Bureau of Alcohol, Tobacco, Firearms, and Explosives (ATF) will be submitting the following...

  3. Conscious Control over Action

    PubMed Central

    Shepherd, Joshua

    2015-01-01

    The extensive involvement of nonconscious processes in human behaviour has led some to suggest that consciousness is much less important for the control of action than we might think. In this article I push against this trend, developing an understanding of conscious control that is sensitive to our best models of overt (that is, bodily) action control. Further, I assess the cogency of various zombie challenges—challenges that seek to demote the importance of conscious control for human agency. I argue that though nonconscious contributions to action control are evidently robust, these challenges are overblown. PMID:26113753

  4. 36 CFR 219.13 - Coordination among Federal agencies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for... proposed actions; (b) For the streamlined coordination of Federal agency policies, resource management... management plans....

  5. 76 FR 20347 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for... information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) Whether the proposed collection of...

  6. 77 FR 15090 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy, DOE. ACTION: Notice and request... information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will... the: DOE Desk Officer, Office of Information and Regulatory Affairs, Office of Management and...

  7. 75 FR 11871 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and request for... Energy (DOE) invites public comment on a proposed emergency collection of information that DOE is... invited on: (a) Whether the proposed collection of information is necessary for the proper performance...

  8. 75 FR 14435 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and request for... Energy (DOE) invites public comment on a proposed emergency collection of information that DOE is... invited on: (a) Whether the proposed collection of information is necessary for the proper performance...

  9. 76 FR 6469 - Agency Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... COMMISSION Agency Information Collection Activities AGENCY: Equal Employment Opportunity Commission. ACTION: Notice of Information Collection--Extension Without Change: Employer Information Report (EEO-1). SUMMARY... three-year extension of the Employer Information Report (EEO-1). DATES: Written comments on this...

  10. 75 FR 14436 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and request for... Energy (DOE) invites public comment on a proposed emergency collection of information that DOE is... invited on: (a) Whether the proposed collection of information is necessary for the proper performance...

  11. 77 FR 31000 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... of Energy Efficiency and Renewable Energy Proposed Agency Information Collection AGENCY: Office of Energy Efficiency and Renewable Energy, U.S. Department of Energy. ACTION: Notice and Request for... Renewable Energy (EERE) has developed and launched a new consumer-focused Web site (...

  12. 75 FR 32750 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    ...://weatherization.ornl.gov . The surveys and data forms that comprise this emergency information request can also be... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for... information collection for the next 3 years. They will also become a matter of public record....

  13. 76 FR 52943 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and request for... Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of... must collect information from Recipients of Recovery Act funded grants, including state and...

  14. 75 FR 15422 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and request for... Energy (DOE) invites public comment on a proposed emergency collection of information that DOE is developing to collect data on the status of activities, project progress, jobs created and retained,...

  15. 75 FR 36375 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... Proposed Agency Information Collection AGENCY: Department of Energy. ACTION: Notice and request for OMB... (DOE) invites public comment on a proposed emergency collection of information that DOE is developing to collect data on the status of activities, project progress, spend rates and performance...

  16. 78 FR 66909 - Agency Information Collection Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... published its Agency Information Collection Extension request in the Federal Register on Thursday, August 29, 2013 (78 FR 53436) and submitted an information collection request to the OMB for extension under the... Information Collection Extension AGENCY: U.S. Department of Energy. ACTION: Submission for Office...

  17. 75 FR 15421 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and request for... Energy (DOE) invites public comment on a proposed emergency collection of information that DOE is developing to collect data on the status of activities, project progress, jobs created and retained,...

  18. 76 FR 30143 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for... information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) Whether the proposed collection of...

  19. 78 FR 25065 - Agency Information Collection Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Energy Information Administration Agency Information Collection Extension AGENCY: U.S. Energy Information Administration (EIA), Department of Energy. ACTION: Notice and request for OMB review and comment. SUMMARY:...

  20. 77 FR 38791 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... of Energy Efficiency and Renewable Energy Proposed Agency Information Collection AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Notice and request for OMB review... June 25, 2012. Kathleen B. Hogan, Deputy Assistant Secretary of Energy, Energy Efficiency and...

  1. 75 FR 16783 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ...Cluer, Program Manager, Wind, Office of Energy Efficiency and Renewable Energy. BILLING CODE 6450-01-P ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request...

  2. 75 FR 14588 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and request for... Energy (DOE) invites public comment on a proposed emergency collection of information that DOE is... rates and performance metrics under the American Recovery and Reinvestment Act of 2009. Comments...

  3. 77 FR 71787 - Agency Information Collection Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Agency Information Collection Extension AGENCY: U.S. Department of Energy. ACTION: Notice and request for comments. SUMMARY: The Department of Energy (DOE), pursuant to the Paperwork Reduction Act of 1995, intends...

  4. 76 FR 63912 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for... information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) Whether the proposed collection of...

  5. 75 FR 19952 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and request for... information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) Whether the proposed collection of...

  6. 75 FR 60094 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and request for...) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. Comments are invited on: (a) Whether the proposed collection of information...

  7. 76 FR 39860 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for... information for a National Evaluation of the State Energy Program that DOE is developing for submission to the... invited on: (a) Whether the proposed collection of information is necessary for the proper performance...

  8. 75 FR 41165 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-15

    ... Proposed Agency Information Collection AGENCY: Department of Energy. ACTION: Notice and request for OMB review and comment. SUMMARY: The Department of Energy (DOE) has submitted the following information... comment on the subject proposal: (a) Whether the proposed collection of information is necessary for...

  9. 75 FR 19953 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and request for... information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) Whether the proposed collection of...

  10. 78 FR 962 - Agency Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    .... 12958'' and inserting ``Executive order No. 13526 (75 FR 707), or any successor thereto''; 2. After... NATIONAL INTELLIGENCE Agency Information Collection Activities AGENCY: Office of the Director of National Intelligence (ODNI). ACTION: Notice. SUMMARY: In December 2011, the ODNI accepted responsibility from...

  11. Bonneville Powerhouse 2 Fish Guidance Efficiency Studies: CFD Model of the Forebay

    SciTech Connect

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2012-07-01

    In ongoing work, U.S. Army Corps of Engineers, Portland District (CENWP) is seeking to better understand and improve the conditions within the Bonneville Powerhouse 2 (B2) turbine intakes to improve survival of downstream migrant salmonid smolt. In this study, the existing B2 forebay computational fluid dynamics (CFD) model was modified to include a more detailed representation of all B2 turbine intakes. The modified model was validated to existing field-measured forebay ADCP velocities. The initial CFD model scenarios tested a single project operation and the impact of adding the Behavior Guidance System (BGS) or Corner Collector. These structures had impacts on forebay flows. Most notable was that the addition of the BGS and Corner Collector reduced the lateral extent of the recirculation areas on the Washington shore and Cascade Island and reduced the flow velocity parallel to the powerhouse in front of Units 11 and 12. For these same cases, at the turbine intakes across the powerhouse, there was very little difference in the flow volume into the gatewell for the clean forebay, and the forebay with the BGS in place and/or the Corner Collector operating. The largest differences were at Units 11 to 13. The CFD model cases testing the impact of the gatewell slot fillers showed no impact to the forebay flows, but large differences within the gatewells. With the slot fillers, the flow above the standard traveling screen and into the gatewell increased (about 100 cfs at each turbine intake) and the gap flow decreased across the powerhouse for all cases. The increased flow up the gatewell was further enhanced with only half the units operating. The flow into the gatewell slot was increased about 35 cfs for each bay of each intake across the powerhouse; this change was uniform across the powerhouse. The flows in the gatewell of Unit 12, the most impacted unit for the scenarios, was evaluated. In front of the vertical barrier screen, the CFD model with slot fillers

  12. Occurrence of uranium-bearing coal, carbonaceous shale, and carbonaceous limestone in the Fall Creek area, Bonneville County, Idaho

    USGS Publications Warehouse

    Vine, James D.; Moore, George W.

    1952-01-01

    Uraniferous coal, carbonaceous shale, and carbonaceous limestone occur in the Bear River formation of Upper Crestaceous age at the Fall Creek prospect, in the Fall Creek area, Bonneville County, IDaho. The uranium compounds are believed to have been derived from mildly radioactive silicic volcanic rocks of the Tertiary age that rest unconformably on all older rocks and once overlay the Bear River formation and its coal. Meteoric water, percolating downward through the silicic volcanic rocks and into the older rocks along joints and faults, is believed to have brought the uranium compounds into contact with the coal and carbonaceous rocks in which the uranium was absorbed.

  13. 76 FR 55059 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... Information Administration Agency Information Collection Activities: Submission for OMB Review; Comment Request AGENCY: Energy Information Administration (EIA), Department of Energy (DOE). ACTION: Agency Information Collection Activities: Submission for OMB Review; Comment Request. SUMMARY: The EIA has...

  14. 78 FR 77439 - Agency Information Collection Activities; Proposed Collection; Comment Request: Part 41, Relating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... COMMISSION Agency Information Collection Activities; Proposed Collection; Comment Request: Part 41, Relating to Security Futures Products AGENCY: Commodity Futures Trading Commission. ACTION: Notice. SUMMARY... extension of a proposed collection of certain information by the agency. In compliance with the...

  15. 76 FR 72391 - Defense Logistics Agency Revised Regulation 1000.22, Environmental Considerations in Defense...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... (DLA) published a Notice of Availability (NOA) in the Federal Register (76 FR 28757) announcing the... of the Secretary Defense Logistics Agency Revised Regulation 1000.22, Environmental Considerations in Defense Logistics Agency Actions AGENCY: Defense Logistics Agency, Department of Defense. ACTION:...

  16. Outdoor Recreation Action. Report No. 10

    ERIC Educational Resources Information Center

    Bureau of Outdoor Recreation (Dept. of Interior), Washington, DC.

    Actions taken in the area of outdoor recreation on Federal, State, local, and private levels are reported in the document. Financing actions are listed according to states, government agencies, and names of private financers. The organization and administration section includes new agencies, personnel, reorganizations, and significant resolutions…

  17. Extending experiences of voluntary action by association.

    PubMed

    Khalighinejad, Nima; Haggard, Patrick

    2016-08-01

    "Sense of agency" refers to the experience that links one's voluntary actions to their external outcomes. It remains unclear whether this ubiquitous experience is hardwired, arising from specific signals within the brain's motor systems, or rather depends on associative learning, through repeated cooccurrence of voluntary movements and their outcomes. To distinguish these two models, we asked participants to trigger a tone by a voluntary keypress action. The voluntary action was always associated with an involuntary movement of the other hand. We then tested whether the combination of the involuntary movement and tone alone might now suffice to produce a sense of agency, even when the voluntary action was omitted. Sense of agency was measured using an implicit marker based on time perception, namely a shift in the perceived time of the outcome toward the action that caused it. Across two experiments, repeatedly pairing an involuntary movement with a voluntary action induced key temporal features of agency, with the outcome now perceived as shifted toward the involuntary movement. This shift required involuntary movements to have been previously associated with voluntary actions. We show that some key aspects of agency may be transferred from voluntary actions to involuntary movements. An internal volitional signal is required for the primary acquisition of agency but, with repeated association, the involuntary movement in itself comes to produce some key temporal features of agency over the subsequent outcome. This finding may explain how humans can develop an enduring sense of agency in nonnatural cases, like brain-machine interfaces. PMID:27436902

  18. Sleep deprivation produces feelings of vicarious agency.

    PubMed

    Hon, Nicholas; Poh, Jia-Hou

    2016-02-01

    A variety of self-related psychological constructs are supported by the fundamental ability to accurately sense either self-agency or lack of agency in some action or outcome. Agency judgments are typically studied in individuals who are well-rested and mentally-fresh; however, in our increasingly fast-paced world, such judgments often need to be made while in less optimal states. Here, we studied the effect of being in one such non-optimal state - when sleep-deprived - on judgments of agency. We found that 24h of total sleep deprivation elevated agency ratings on trials designed to produce a strong sense of non-agency. These data provide the first evidence that physiological state variables can affect agency processing in the normal population.

  19. Sleep deprivation produces feelings of vicarious agency.

    PubMed

    Hon, Nicholas; Poh, Jia-Hou

    2016-02-01

    A variety of self-related psychological constructs are supported by the fundamental ability to accurately sense either self-agency or lack of agency in some action or outcome. Agency judgments are typically studied in individuals who are well-rested and mentally-fresh; however, in our increasingly fast-paced world, such judgments often need to be made while in less optimal states. Here, we studied the effect of being in one such non-optimal state - when sleep-deprived - on judgments of agency. We found that 24h of total sleep deprivation elevated agency ratings on trials designed to produce a strong sense of non-agency. These data provide the first evidence that physiological state variables can affect agency processing in the normal population. PMID:26773604

  20. An Investigation of Transgressive Deposits in Late Pleistocene Lake Bonneville using GPR and UAV-produced DEMs.

    NASA Astrophysics Data System (ADS)

    Schide, K.; Jewell, P. W.; Oviatt, C. G.; Jol, H. M.

    2015-12-01

    Lake Bonneville was the largest of the Pleistocene pluvial lakes that once filled the Great Basin of the interior western United States. Its two most prominent shorelines, Bonneville and Provo, are well documented but many of the lake's intermediate shoreline features have yet to be studied. These transgressive barriers and embankments mark short-term changes in the regional water budget and thus represent a proxy for local climate change. The internal and external structures of these features are analyzed using the following methods: ground penetrating radar, 5 meter auto-correlated DEMs, 1-meter DEMs generated from LiDAR, high-accuracy handheld GPS, and 3D imagery collected with an unmanned aerial vehicle. These methods in mapping, surveying, and imaging provide a quantitative analysis of regional sediment availability, transportation, and deposition as well as changes in wave and wind energy. These controls help define climate thresholds and rates of landscape evolution in the Great Basin during the Pleistocene that are then evaluated in the context of global climate change.

  1. Early utility experience with wind power generation. Volume 3: Bonneville Power Administration Goodnoe Hills Project. Final report

    SciTech Connect

    McCabe, T.; Henry, G.; Tennis, M.; Goldenblatt, M.

    1984-01-01

    This report is one of three presenting the results of EPRI Research Project 1590-1, Evaluation of Electric Utility Experience with Wind Power Generation. The objective of this project was to develop an improved understanding of wind power generation, in particular the process a utility must undergo to initiate and carry out a wind turbine project. The primary tasks of RP1590-1 were to document and evaluate the experience of two utilities with megawatt-scale wind turbine installations from project inception to the wind turbine's first rotation. This technical report presents the experiences of the Bonneville Power Administration (BPA) as the participating utility in the MOD-2 cluster field test program. Under this program the National Aeronautics and Space Administration (NASA) as management agent for the US Department of Energy, has installed three MOD-2 wind turbines at Bonneville's Goodnoe Hills site. All documents and reports pertaining to BPA's experience with wind energy at Goodnoe Hills were reviewed and excerpts made of the highlights. Gaps in the documentation were filled by talking with the appropriate people. Site visits were conducted to monitor current activity. The information obtained was evaluated for its generic relevance and benefit to other utilities. The chronology of the steps taken in implementing the wind turbine project and some of the lessons learned are included in the report. In each section, important activities, critical assumptions, and interesting insights which might benefit other utility wind programs are identified.

  2. A bill to prohibit the Administrator of the Federal Emergency Management Agency from taking administrative action to recover certain payments for disaster or emergency assistance, and for other purposes.

    THOMAS, 113th Congress

    Sen. Nelson, Bill [D-FL

    2016-09-28

    09/28/2016 Read twice and referred to the Committee on Homeland Security and Governmental Affairs. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  3. Time perception and the experience of agency.

    PubMed

    Haering, Carola; Kiesel, Andrea

    2016-03-01

    In the current study, we investigate whether sense of agency over an effect coincides with the perceived time of the effect that occurs either at its usual time or earlier or later than usual. One group of participants usually perceived an action effect immediately after the action, another group delayed by 250 ms. In test blocks the effect stimulus was sometimes presented earlier or later than usual. Participants judged either the degree of experienced agency over the effect or whether the effect had appeared at its usual time, or earlier or later than usual. In both groups experienced agency and the perception of the effect's time 'as usual' were highly correlated. To rule out that time judgments influenced sense of agency, we replicated the pattern of agency judgments in Experiment 2 in which participants only judged agency. Taken together, we demonstrated that agency and time judgments vary similarly across temporal deviations of effects irrespective of to which delay participants were adapted to. The high correlation of judgment types indicates that perceiving an effect at its usual time and sensing to have caused the effect are closely related. In contrast, physical temporal proximity of actions and effects has only a minor impact on experienced agency.

  4. Choosing Actions

    PubMed Central

    Rosenbaum, David A.; Chapman, Kate M.; Coelho, Chase J.; Gong, Lanyun; Studenka, Breanna E.

    2013-01-01

    Actions that are chosen have properties that distinguish them from actions that are not. Of the nearly infinite possible actions that can achieve any given task, many of the unchosen actions are irrelevant, incorrect, or inappropriate. Others are relevant, correct, or appropriate but are disfavored for other reasons. Our research focuses on the question of what distinguishes actions that are chosen from actions that are possible but are not. We review studies that use simple preference methods to identify factors that contribute to action choices, especially for object-manipulation tasks. We can determine which factors are especially important through simple behavioral experiments. PMID:23761769

  5. Action semantics modulate action prediction.

    PubMed

    Springer, Anne; Prinz, Wolfgang

    2010-11-01

    Previous studies have demonstrated that action prediction involves an internal action simulation that runs time-locked to the real action. The present study replicates and extends these findings by indicating a real-time simulation process (Graf et al., 2007), which can be differentiated from a similarity-based evaluation of internal action representations. Moreover, results showed that action semantics modulate action prediction accuracy. The semantic effect was specified by the processing of action verbs and concrete nouns (Experiment 1) and, more specifically, by the dynamics described by action verbs (Experiment 2) and the speed described by the verbs (e.g., "to catch" vs. "to grasp" vs. "to stretch"; Experiment 3). These results propose a linkage between action simulation and action semantics as two yet unrelated domains, a view that coincides with a recent notion of a close link between motor processes and the understanding of action language.

  6. Agency attribution: event-related potentials and outcome monitoring.

    PubMed

    Bednark, Jeffery G; Franz, Elizabeth A

    2014-04-01

    Knowledge about the effects of our actions is an underlying feature of voluntary behavior. Given the importance of identifying the outcomes of our actions, it has been proposed that the sensory outcomes of self-made actions are inherently different from those of externally caused outcomes. Thus, the outcomes of self-made actions are likely to be more motivationally significant for an agent. We used event-related potentials to investigate the relationship between the perceived motivational significance of an outcome and the attribution of agency in the presence of others. In our experiment, we assessed agency attribution in the presence of another agent by varying the degree of contiguity between participants' self-made actions and the sensory outcome. Specifically, we assessed the feedback correct-related positivity (fCRP) and the novelty P3 measures of an outcome's motivational significance and unexpectedness, respectively. Results revealed that both the fCRP and participants' agency attributions were significantly influenced by action-outcome contiguity. However, when action-outcome contiguity was ambiguous, novelty P3 amplitude was a reliable indicator of agency attribution. Prior agency attributions were also found to influence attribution in trials with ambiguous and low action-outcome contiguity. Participants' use of multiple cues to determine agency is consistent with the cue integration theory of agency. In addition to these novel findings, this study supports growing evidence suggesting that reinforcement processes play a significant role in the sense of agency. PMID:24504195

  7. Agency attribution: event-related potentials and outcome monitoring.

    PubMed

    Bednark, Jeffery G; Franz, Elizabeth A

    2014-04-01

    Knowledge about the effects of our actions is an underlying feature of voluntary behavior. Given the importance of identifying the outcomes of our actions, it has been proposed that the sensory outcomes of self-made actions are inherently different from those of externally caused outcomes. Thus, the outcomes of self-made actions are likely to be more motivationally significant for an agent. We used event-related potentials to investigate the relationship between the perceived motivational significance of an outcome and the attribution of agency in the presence of others. In our experiment, we assessed agency attribution in the presence of another agent by varying the degree of contiguity between participants' self-made actions and the sensory outcome. Specifically, we assessed the feedback correct-related positivity (fCRP) and the novelty P3 measures of an outcome's motivational significance and unexpectedness, respectively. Results revealed that both the fCRP and participants' agency attributions were significantly influenced by action-outcome contiguity. However, when action-outcome contiguity was ambiguous, novelty P3 amplitude was a reliable indicator of agency attribution. Prior agency attributions were also found to influence attribution in trials with ambiguous and low action-outcome contiguity. Participants' use of multiple cues to determine agency is consistent with the cue integration theory of agency. In addition to these novel findings, this study supports growing evidence suggesting that reinforcement processes play a significant role in the sense of agency.

  8. 44 CFR 351.22 - The Environmental Protection Agency.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Assignments § 351.22 The Environmental Protection Agency. (a) Establish Protective Action Guides (PAGs) for... guidance will be presented in the Environmental Protection Agency (EPA) “Manual of Protective Action Guides... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true The Environmental...

  9. 44 CFR 351.22 - The Environmental Protection Agency.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Assignments § 351.22 The Environmental Protection Agency. (a) Establish Protective Action Guides (PAGs) for... guidance will be presented in the Environmental Protection Agency (EPA) “Manual of Protective Action Guides... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false The Environmental...

  10. 44 CFR 351.22 - The Environmental Protection Agency.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Assignments § 351.22 The Environmental Protection Agency. (a) Establish Protective Action Guides (PAGs) for... guidance will be presented in the Environmental Protection Agency (EPA) “Manual of Protective Action Guides... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false The Environmental...

  11. 44 CFR 351.22 - The Environmental Protection Agency.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Assignments § 351.22 The Environmental Protection Agency. (a) Establish Protective Action Guides (PAGs) for... guidance will be presented in the Environmental Protection Agency (EPA) “Manual of Protective Action Guides... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false The Environmental...

  12. 77 FR 62469 - Defense Logistics Agency Freedom of Information Act Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... of the Secretary 32 CFR Part 300 Defense Logistics Agency 32 CFR Part 1285 RIN 0790-AI87 Defense Logistics Agency Freedom of Information Act Program AGENCY: Defense Logistics Agency, DoD. ACTION: Proposed rule. SUMMARY: The Defense Logistics Agency (DLA) proposes to revise and update its existing...

  13. 40 CFR 35.6250 - Support agency Cooperative Agreement requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Support Agency Cooperative Agreements § 35.6250 Support agency... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Support agency Cooperative...

  14. 29 CFR 11.3 - Responsible agency officials.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... contacts with CEQ and the Environmental Protection Agency (EPA) as the Departmental NEPA liaison; and (3... by 40 CFR part 1503; (v) Assuring that environmental documents prepared by their agencies accompany... mitigation of adverse environmental effects of agency actions. (2) In accordance with 40 CFR...

  15. 29 CFR 11.3 - Responsible agency officials.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... contacts with CEQ and the Environmental Protection Agency (EPA) as the Departmental NEPA liaison; and (3... by 40 CFR part 1503; (v) Assuring that environmental documents prepared by their agencies accompany... mitigation of adverse environmental effects of agency actions. (2) In accordance with 40 CFR...

  16. 29 CFR 11.3 - Responsible agency officials.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contacts with CEQ and the Environmental Protection Agency (EPA) as the Departmental NEPA liaison; and (3... by 40 CFR part 1503; (v) Assuring that environmental documents prepared by their agencies accompany... mitigation of adverse environmental effects of agency actions. (2) In accordance with 40 CFR...

  17. Agency in Paul and Implications for Adolescent Girls

    ERIC Educational Resources Information Center

    Peck-McClain, Emily A.

    2015-01-01

    Agency is a particular concern for ministry with adolescent girls because they rarely see themselves as subjects of their own lives. Human agency is often emphasized in churches as a way to explain human sinful action. As a population treated as objects by society, it is important for young women to embrace and exercise their agency in order to be…

  18. 44 CFR 334.6 - Department and agency responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Department and agency responsibilities. 334.6 Section 334.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... emergency. (b) Each department and agency should identify response actions appropriate for the early...

  19. 44 CFR 334.6 - Department and agency responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Department and agency responsibilities. 334.6 Section 334.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... emergency. (b) Each department and agency should identify response actions appropriate for the early...

  20. 44 CFR 334.6 - Department and agency responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Department and agency responsibilities. 334.6 Section 334.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... emergency. (b) Each department and agency should identify response actions appropriate for the early...