Science.gov

Sample records for action agencies bonneville

  1. 75 FR 60745 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice... contain the policy and establish the procedures that BPA uses in the solicitation, award, and... $30, or without charge at the following Internet address:...

  2. 77 FR 58984 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice... contain the policy and establish the procedures that BPA uses in the solicitation, award, and... at the following Internet address: http://www.bpa.gov/corporate/business/bpi . Copies of...

  3. 76 FR 63290 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice... contain the policy and establish the procedures that BPA uses in the solicitation, award, and... at the following Internet address: http://www.bpa.gov/corporate/business/bpi . Copies of...

  4. 78 FR 57372 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ... Financial Assistance Instructions (BFAI) AGENCY: Bonneville Power Administration (BPA), DOE. ACTION: Notice... contain the policy and establish the procedures that BPA uses in the solicitation, award, and... at the following Internet address: http://www.bpa.gov/corporate/business/bpi . Copies of...

  5. 7 CFR 1794.33 - Agency action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Agency action. 1794.33 Section 1794.33 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE... action. RUS may act on an application for financial assistance upon determining, based on the review...

  6. 40 CFR 1506.10 - Timing of agency action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... § 1506.10 Timing of agency action. (a) The Environmental Protection Agency shall publish a notice in the... with the Environmental Protection Agency, the minimum thirty (30) day period and the minimum ninety (90... periods. The Environmental Protection Agency may upon a showing by the lead agency of compelling......

  7. 40 CFR 1506.10 - Timing of agency action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 1506.10 Timing of agency action. (a) The Environmental Protection Agency shall publish a notice in the... with the Environmental Protection Agency, the minimum thirty (30) day period and the minimum ninety (90... periods. The Environmental Protection Agency may upon a showing by the lead agency of compelling......

  8. 40 CFR 1506.10 - Timing of agency action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 1506.10 Timing of agency action. (a) The Environmental Protection Agency shall publish a notice in the... with the Environmental Protection Agency, the minimum thirty (30) day period and the minimum ninety (90... periods. The Environmental Protection Agency may upon a showing by the lead agency of compelling......

  9. 40 CFR 1506.10 - Timing of agency action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 1506.10 Timing of agency action. (a) The Environmental Protection Agency shall publish a notice in the... with the Environmental Protection Agency, the minimum thirty (30) day period and the minimum ninety (90... periods. The Environmental Protection Agency may upon a showing by the lead agency of compelling......

  10. 5 CFR 250.103 - Consequences of improper agency actions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Consequences of improper agency actions. 250.103 Section 250.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies §...

  11. 5 CFR 250.103 - Consequences of improper agency actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Consequences of improper agency actions. 250.103 Section 250.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies §...

  12. 5 CFR 250.103 - Consequences of improper agency actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Consequences of improper agency actions. 250.103 Section 250.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies §...

  13. 5 CFR 250.103 - Consequences of improper agency actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Consequences of improper agency actions. 250.103 Section 250.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies §...

  14. 5 CFR 250.103 - Consequences of improper agency actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Consequences of improper agency actions. 250.103 Section 250.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies §...

  15. 41 CFR 60-2.2 - Agency action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...), the affirmative action program will be deemed to have been accepted by the Government at the time... attention, through sources within his/her agency or through the OFCCP or other Government agencies, that...

  16. British Chinese Children: Agency and Action

    ERIC Educational Resources Information Center

    Clayton, Carmen Lau

    2013-01-01

    The assumption that Chinese young people are passive beings with little or no agency is a dominant theme within the academic literature. However PhD research findings demonstrate how British Chinese adolescents (aged 11-14) do exhibit varying degrees of agency in their lives. Here, agency is understood as individuals having the capacity to act, to…

  17. 29 CFR 11.10 - Identification of agency actions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Identification of agency actions. 11.10 Section 11.10 Labor Office of the Secretary of Labor DEPARTMENT OF LABOR NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) COMPLIANCE PROCEDURES Administrative Procedures § 11.10 Identification of agency actions. Pursuant to the CEQ definition of “major Federal action” (40...

  18. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  19. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  20. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  1. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  2. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  3. 7 CFR 247.35 - Local agency appeals of State agency actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Local agency appeals of State agency actions. 247.35 Section 247.35 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS COMMODITY SUPPLEMENTAL FOOD PROGRAM § 247.35 Local agency appeals of State...

  4. Sense of agency and intentional binding in joint action.

    PubMed

    Obhi, Sukhvinder S; Hall, Preston

    2011-06-01

    Understanding the sense of agency is a key challenge for the psychological and brain sciences. When an individual makes an action that is followed by an effect such as an auditory tone, there is a perceived compression in time of the interval between the action and the effect. Since this only occurs for intentional actions, this compression is termed 'intentional binding' and has been suggested as an implicit measure of agency. Very little is known about how the sense of agency and indeed intentional binding may be altered in joint action contexts in which two individuals act and an effect occurs. Here, we assessed the subjective sense of agency via self-report and implicit agency via intentional binding in a joint action task in which one person initiated a movement which another person joined in with. We further manipulated whether both individuals knew who the initiator would be ahead of time (by assigning one person as the initiator at the start of a block of trials) or whether this became apparent in a dynamic fashion based on who acted first. In both settings, only the initiator reported reliable subjective feelings of agency, whereas both the initiator and the responder demonstrated significant and indistinguishable intentional binding. We suggest that, when two individuals are involved in a joint action context, there is an automatic formation of a new agentic identity (a 'we' identity). In such contexts, both partners register agency at the pre-reflective level, despite the fact that their subjective experience of agency differs, and indeed, their role in producing the outcome differs. Hence, the subjective sense of agency and intentional binding are dissociable, and it remains for future work to understand how pre-reflective agency 'registration' and the reflective 'experience' of agency are, if at all, related. PMID:21503647

  5. Acronyms and Agencies. Alliance Action Information Sheets

    ERIC Educational Resources Information Center

    Technical Assistance ALLIANCE for Parent Centers, 2007

    2007-01-01

    This paper presents acronyms related to early intervention, education, special education, and other laws important to individuals with disabilities and their families. For related information, also read Acronyms and the Law. [For related report, "Acronyms and the Law. Alliance Action Information Sheets," see ED534052.

  6. 29 CFR 1614.110 - Final action by agencies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL EMPLOYMENT OPPORTUNITY Agency Program To Promote Equal Employment Opportunity § 1614.110 Final action by... right to appeal to the Equal Employment Opportunity Commission, the right to file a civil action...

  7. 21 CFR 99.301 - Agency action on a submission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 1 2011-04-01 2011-04-01 false Agency action on a submission. 99.301 Section 99.301 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL DISSEMINATION OF INFORMATION ON UNAPPROVED/NEW USES FOR MARKETED DRUGS, BIOLOGICS, AND DEVICES FDA Action on Submissions, Requests, and Applications...

  8. Negative emotional outcomes attenuate sense of agency over voluntary actions.

    PubMed

    Yoshie, Michiko; Haggard, Patrick

    2013-10-21

    Sense of agency (SoA) refers to the feeling that one's voluntary actions produce external sensory events [1, 2]. Several psychological theories hypothesized links between SoA and affective evaluation [3-6]. For example, people tend to attribute positive outcomes to their own actions, perhaps reflecting high-level narrative processes that enhance self-esteem [3]. Here we provide the first evidence that such emotional modulations also involve changes in the low-level sensorimotor basis of agency. The intentional binding paradigm [1] was used to quantify the subjective temporal compression between a voluntary action and its sensory consequences, providing an implicit measure of SoA. Emotional valence of action outcomes was manipulated by following participants' key-press actions with negative or positive emotional vocalizations [7], or neutral sounds. We found that intentional binding was reduced for negative compared to positive or neutral outcomes. Discriminant analyses identified a change in time perception of both actions and their negative outcomes, demonstrating that the experience of action itself is subject to affective modulation. A small binding benefit was also found for positive action outcomes. Emotional modulation of SoA may contribute to regulating social behavior. Correctly tracking the valenced effects of one's voluntary actions on other people could underlie successful social interactions. PMID:24094850

  9. To 'Bonneville' and Beyond

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The route of NASA's Mars Exploration Rover Spirit, from its landing site to its location on sol 72 (March 16, 2004) near the rim of the large crater dubbed 'Bonneville' is pictured here on this traverse map. The map consists of data from NASA's Mars Global Surveyor orbiter and NASA's Mars Odyssey orbiter. The varying terrains surrounding Bonneville--crater floor, crater wall, crater rim, crater ejecta (material ejected from the crater) and intercrater plains--are highlighted in different colors.

  10. Integrating Action Theory and Human Agency in Career Development.

    ERIC Educational Resources Information Center

    Chen, Charles P.

    2002-01-01

    Paper discusses and analyzes the correlation between action theory and the notion of human agency in a life career development context. Theoretical and research background of the two perspectives are discussed. Connections between the two perspectives are identified. Career counseling implications that enhance integration of individuals' action…

  11. 5 CFR 300.705 - Agency action following statement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Agency action following statement. 300.705 Section 300.705 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EMPLOYMENT (GENERAL) Statutory Bar to Appointment of Persons Who Fail To Register Under Selective Service...

  12. 5 CFR 300.705 - Agency action following statement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Agency action following statement. 300.705 Section 300.705 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EMPLOYMENT (GENERAL) Statutory Bar to Appointment of Persons Who Fail To Register Under Selective Service...

  13. 5 CFR 300.705 - Agency action following statement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Agency action following statement. 300.705 Section 300.705 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EMPLOYMENT (GENERAL) Statutory Bar to Appointment of Persons Who Fail To Register Under Selective Service...

  14. 5 CFR 300.705 - Agency action following statement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Agency action following statement. 300.705 Section 300.705 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EMPLOYMENT (GENERAL) Statutory Bar to Appointment of Persons Who Fail To Register Under Selective Service...

  15. 5 CFR 300.705 - Agency action following statement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Agency action following statement. 300.705 Section 300.705 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EMPLOYMENT (GENERAL) Statutory Bar to Appointment of Persons Who Fail To Register Under Selective Service...

  16. 7 CFR 245.10 - Action by local educational agencies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND FREE MILK IN SCHOOLS § 245.10 Action by local educational agencies. (a) Each local educational agencyof a school desiring to participate in the National School Lunch Program, School Breakfast Program, or to provide free milk under the Special Milk Program, or to become a commodity-only school...

  17. 7 CFR 245.10 - Action by local educational agencies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND FREE MILK IN SCHOOLS § 245.10 Action by local educational agencies. (a) Each local educational agencyof a school desiring to participate in the National School Lunch Program, School Breakfast Program, or to provide free milk under the Special Milk Program, or to become a commodity-only school...

  18. 7 CFR 245.10 - Action by local educational agencies.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND FREE MILK IN SCHOOLS § 245.10 Action by local educational agencies. (a) Each local educational agencyof a school desiring to participate in the National School Lunch Program, School Breakfast Program, or to provide free milk under the Special Milk Program, or to become a commodity-only school...

  19. 7 CFR 245.10 - Action by local educational agencies.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND FREE MILK IN SCHOOLS § 245.10 Action by local educational agencies. (a) Each local educational agencyof a school desiring to participate in the National School Lunch Program, School Breakfast Program, or to provide free milk under the Special Milk Program, or to become a commodity-only school...

  20. 7 CFR 245.10 - Action by local educational agencies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND FREE MILK IN SCHOOLS § 245.10 Action by local educational agencies. (a) Each local educational agencyof a school desiring to participate in the National School Lunch Program, School Breakfast Program, or to provide free milk under the Special Milk Program, or to become a commodity-only school...

  1. 7 CFR 245.11 - Action by State agencies and FNSROs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Action by State agencies and FNSROs. 245.11 Section... AND FREE MILK IN SCHOOLS § 245.11 Action by State agencies and FNSROs. (a) Each State agency, or FNSRO... action required to be taken. (g) The State agency must notify FNS whether the TANF Program in their...

  2. 7 CFR 245.11 - Action by State agencies and FNSROs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Action by State agencies and FNSROs. 245.11 Section... AND FREE MILK IN SCHOOLS § 245.11 Action by State agencies and FNSROs. (a) Each State agency, or FNSRO... action required to be taken. (g) The State agency must notify FNS whether the TANF Program in their...

  3. 7 CFR 245.11 - Action by State agencies and FNSROs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Action by State agencies and FNSROs. 245.11 Section... AND FREE MILK IN SCHOOLS § 245.11 Action by State agencies and FNSROs. (a) Each State agency, or FNSRO... action required to be taken. (g) The State agency must notify FNS whether the TANF Program in their...

  4. Spirit Spies 'Bonneville'

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This mosaic image from the panoramic camera on the Mars Exploration Rover Spirit shows the area in front of the rover after its record 27.5 meters (90.2 feet) drive on Sol 43, which ended February 16, 2004. Spirit is looking toward one of its future targets, the rim of a crater nicknamed 'Bonneville.'

  5. 78 FR 59085 - Notice of Final Federal Agency Action on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ... responsibilities under 23 U.S.C. 327, as well as actions by other Federal agencies, are final within the meaning of..., as well as by other Federal agencies. A claim seeking judicial review of the Federal agency...

  6. 'Bonneville Crater' Panorama

    NASA Technical Reports Server (NTRS)

    2004-01-01

    [figure removed for brevity, see original site] Click on the image for 'Bonneville Crater' Panorama (QTVR)

    This 360-degree view from a position beside the crater informally named 'Bonneville' was assembled from frames taken by the panoramic camera on NASA's Mars Exploration Rover Spirit. Half of this panorama was first released on March 15, 2004. The entire mosaic, recently completed, reveals not only the crater rim and interior, but Spirit's tracks and a glimpse at part of the rover. The images were acquired on sol 68, March 12, 2004, just one day after Spirit reached this location.

    The image is a false-color composite made from frames taken with the camera's L2 (750 nanometer), L5 (530 nanometer) and L6 (480 nanometer) filters.

  7. 'Bonneville' in 3-D!

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The Mars Exploration Rover Spirit took this 3-D navigation camera mosaic of the crater called 'Bonneville' after driving approximately 13 meters (42.7 feet) to get a better vantage point. Spirit's current position is close enough to the edge to see the interior of the crater, but high enough and far enough back to get a view of all of the walls. Because scientists and rover controllers are so pleased with this location, they will stay here for at least two more martian days, or sols, to take high resolution panoramic camera images of 'Bonneville' in its entirety. Just above the far crater rim, on the left side, is the rover's heatshield, which is visible as a tiny reflective speck.

  8. 'Bonneville in Color'

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The rim and interior of a crater nicknamed 'Bonneville' dominate this 180-degree, false-color mosaic of images taken by the panoramic camera of NASA's Mars Exploration Rover Spirit. Spirit recorded this view on the rover's 68th sol, March 12, 2004, one sol after reaching this location. The rover remaining here in part to get this very high-resolution, color mosaic, from which scientists can gain insight about the depth of the surface material at Bonneville and make future observation plans. On sol 71, Spirit was instructed to drive approximately 15 meters (49 feet) along the crater rim to a new vantage point. The image is a false-color composite made from frames taken with the camera's L2, L5 and L6 filters.

  9. 76 FR 31677 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-01

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial... agency actions on the highway project will be barred unless the claim is filed on or before November...

  10. 77 FR 66910 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial... of the Federal agency actions on the highway project will be barred unless the claim is filed on...

  11. 36 CFR 907.16 - Actions where lead Agency designation is necessary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Actions where lead Agency... DEVELOPMENT CORPORATION ENVIRONMENTAL QUALITY § 907.16 Actions where lead Agency designation is necessary. (a... proximity, the Corporation will seek designation as lead agency for those actions that directly relate...

  12. 36 CFR 907.16 - Actions where lead Agency designation is necessary.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false Actions where lead Agency... DEVELOPMENT CORPORATION ENVIRONMENTAL QUALITY § 907.16 Actions where lead Agency designation is necessary. (a... proximity, the Corporation will seek designation as lead agency for those actions that directly relate...

  13. 36 CFR 907.16 - Actions where lead Agency designation is necessary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Actions where lead Agency... DEVELOPMENT CORPORATION ENVIRONMENTAL QUALITY § 907.16 Actions where lead Agency designation is necessary. (a... proximity, the Corporation will seek designation as lead agency for those actions that directly relate...

  14. 36 CFR 907.16 - Actions where lead Agency designation is necessary.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true Actions where lead Agency... DEVELOPMENT CORPORATION ENVIRONMENTAL QUALITY § 907.16 Actions where lead Agency designation is necessary. (a... proximity, the Corporation will seek designation as lead agency for those actions that directly relate...

  15. 36 CFR 907.16 - Actions where lead Agency designation is necessary.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Actions where lead Agency... DEVELOPMENT CORPORATION ENVIRONMENTAL QUALITY § 907.16 Actions where lead Agency designation is necessary. (a... proximity, the Corporation will seek designation as lead agency for those actions that directly relate...

  16. Bonneville Power Administration 1991 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-01-01

    Congress enacted the Bonneville Project Act in 1937, creating the Bonneville Power Administration to market and transmit the power produced by Bonneville Dam on the Columbia River. Since then, Congress has directed BPA to sell at wholesale the power produced at a total of 30 Federal dams in the Pacific Northwest, and to acquire conservation and generating resources sufficient to meet the needs of BPA`s customer utilities. The dams and the electrical system are known as the Federal Columbia River Power System. Bonneville sells wholesale power to public and private utilities, rural cooperatives, large industries, and Federal agencies. BPA also sells or exchanges power with utilities in California. BPA uses revenues from the sale of power and transmission services to recover its own expenses, to repay the Federal investment in the power system, and to pay for the resources it has acquired. BPA pays for operation and maintenance expenses at the Federal dams and at non-Federal power plants. It also pays for irrigation benefits of Federal projects allocated to power to repay, and for fish and wildlife projects which offset damage to these resources by the Federal hydropower system. This document is the 1991 statement of budget, financial statement, cash flows, capitalization, expenses, and projects. An organization chart is included.

  17. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  18. 'Bonneville' and Beyond

    NASA Technical Reports Server (NTRS)

    2004-01-01

    On the 66th martian day, or sol, of its mission, the Mars Exploration Rover Spirit finished a drive and sent back this navigation camera panorama showing 'Bonneville' crater and the rocky plains surrounding it. The rover's solar panels are visible in the foreground, and the to right, the Columbia Hills complex. Zooming into the picture, the rover's parachute can be seen as a tiny white dot at the far left, and just above the far crater rim is the heatsheild, visible as a tiny reflective speck.

  19. 36 CFR 1010.15 - Actions where lead agency designation is necessary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL QUALITY § 1010.15 Actions where lead agency designation is necessary. (a) Consistent with 40 CFR... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Actions where lead agency... functional interdependence or geographical proximity, the Trust will seek designation as lead agency...

  20. 36 CFR 1010.15 - Actions where lead agency designation is necessary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL QUALITY § 1010.15 Actions where lead agency designation is necessary. (a) Consistent with 40 CFR... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Actions where lead agency... functional interdependence or geographical proximity, the Trust will seek designation as lead agency...

  1. 36 CFR 1010.15 - Actions where lead agency designation is necessary.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL QUALITY § 1010.15 Actions where lead agency designation is necessary. (a) Consistent with 40 CFR... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false Actions where lead agency... functional interdependence or geographical proximity, the Trust will seek designation as lead agency...

  2. 36 CFR 1010.15 - Actions where lead agency designation is necessary.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL QUALITY § 1010.15 Actions where lead agency designation is necessary. (a) Consistent with 40 CFR... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true Actions where lead agency... functional interdependence or geographical proximity, the Trust will seek designation as lead agency...

  3. 36 CFR 1010.15 - Actions where lead agency designation is necessary.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL QUALITY § 1010.15 Actions where lead agency designation is necessary. (a) Consistent with 40 CFR... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Actions where lead agency... functional interdependence or geographical proximity, the Trust will seek designation as lead agency...

  4. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Administration on December 16, 2011 (76 FR 78332). This notice applies to all Federal agency decisions, actions... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Light Rail Project in... meaning of 23 U.S.C. 139(l)(1). The actions relate to the East Link Light Rail Transit Project in...

  5. 77 FR 37953 - Final Federal Agency Actions on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ... Agency Actions on Proposed Bridge in Massachusetts'' in the Federal Register at 77 FR 1782. The proposed... Federal Highway Administration Final Federal Agency Actions on Proposed Bridge Replacement in... action relates to the proposed Fore River Bridge (State Route 3A over the Weymouth Fore...

  6. 77 FR 59035 - Notice of Final Federal Agency Action on Proposed Bridge Rehabilitation and Restoration in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Rehabilitation and... Longfellow Bridge Rehabilitation and Restoration Project in Boston and Cambridge, Massachusetts. The action... final agency action subject to 23 U.S.C. Sec. 139(l)(1) by issuing approval for the following...

  7. 75 FR 37878 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 326... other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a... final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the...

  8. 75 FR 29601 - Notice of Final Federal Agency Actions on a Proposed Highway Project in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ...(1)(1). This action relates to an approval of a proposed highway project corridor. DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(1)(1). A claim... agency actions by issuing approvals for the Placer Parkway Corridor Preservation Project--Tier 1 in...

  9. The Road to 'Bonneville'

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This false-color panoramic camera composite traverse map depicts the Mars Exploration Rover Spirit's journey since landing at Gusev Crater, Mars. It was generated from three of the camera's different wavelength filters (750 nanometers, 530 nanometers and 480 nanometers). This map was created on the 65th martian day, or sol, of Spirit's mission, after Spirit had traveled 328 meters (1076 feet) from its lander to the rim of the crater dubbed 'Bonneville.' From this high point, Spirit was able to capture with its panoramic camera the entire rover traverse. The map points out major stops that Spirit made along the way, including features nicknamed 'Adirondack;' 'Stone Council;' 'Laguna Hollow;' and 'Humphrey.' Also highlighted is the landscape feature informally named 'Grissom Hill' and Spirit's landing site, the Columbia Memorial Station.

  10. Difficult action decisions reduce the sense of agency: A study using the Eriksen flanker task.

    PubMed

    Sidarus, Nura; Haggard, Patrick

    2016-05-01

    The sense of agency refers to the feeling that we are in control of our actions and, through them, of events in the outside world. Much research has focused on the importance of retrospectively matching predicted and actual action outcomes for a strong sense of agency. Yet, recent studies have revealed that a metacognitive signal about the fluency of action selection can prospectively inform our sense of agency. Fluent, or easy, action selection leads to a stronger sense of agency over action outcomes than dysfluent, or difficult, selection. Since these studies used subliminal priming to manipulate action selection, it remained unclear whether supraliminal stimuli affecting action selection would have similar effects. We used supraliminal flankers to manipulate action selection in response to a central target. Experiment 1 revealed that conflict in action selection, induced by incongruent flankers and targets, led to reduced agency ratings over an outcome that followed the participant's response, relative to neutral and congruent flanking conditions. Experiment 2 replicated this result, and extended it to free choice between alternative actions. Finally, Experiment 3 varied the stimulus onset asynchrony (SOA) between flankers and target. Action selection performance varied with SOA. Agency ratings were always lower in incongruent than congruent trials, and this effect did not vary across SOAs. Sense of agency is influenced by a signal that tracks conflict in action selection, regardless of the visibility of stimuli inducing conflict, and even when the timing of the stimuli means that the conflict may not affect performance. PMID:27017411

  11. Implicit agency in observed actions: evidence for N1 suppression of tones caused by self-made and observed actions.

    PubMed

    Poonian, Simandeep K; McFadyen, Jessica; Ogden, Jessica; Cunnington, Ross

    2015-04-01

    Every day we make attributions about how our actions and the actions of others cause consequences in the world around us. It is unknown whether we use the same implicit process in attributing causality when observing others' actions as we do when making our own. The aim of this research was to investigate the neural processes involved in the implicit sense of agency we form between actions and effects, for both our own actions and when watching others' actions. Using an interval estimation paradigm to elicit intentional binding in self-made and observed actions, we measured the EEG responses indicative of anticipatory processes before an action and the ERPs in response to the sensory consequence. We replicated our previous findings that we form a sense of implicit agency over our own and others' actions. Crucially, EEG results showed that tones caused by either self-made or observed actions both resulted in suppression of the N1 component of the sensory ERP, with no difference in suppression between consequences caused by observed actions compared with self-made actions. Furthermore, this N1 suppression was greatest for tones caused by observed goal-directed actions rather than non-action or non-goal-related visual events. This suggests that top-down processes act upon the neural responses to sensory events caused by goal-directed actions in the same way for events caused by the self or those made by other agents. PMID:25321488

  12. Spirit's Path to Bonneville

    NASA Technical Reports Server (NTRS)

    2004-01-01

    Scientists created this overlay map by laying navigation and panoramic camera images taken from the surface of Mars on top of one of Spirit's descent images taken as the spacecraft descended to the martian surface. The map was created to help track the path that Spirit has traveled through sol 44 and to put into perspective the distance left to travel before reaching the edge of the large crater nicknamed 'Bonneville.'

    The area boxed in yellow contains the ground images that have been matched to and layered on top of the descent image. The yellow line shows the path that Spirit has traveled and the red dashed line shows the intended path for future sols. The blue circles highlight hollowed areas on the surface, such as Sleepy Hollow, near the lander, and Laguna Hollow, the sol 45 drive destination. Scientists use these hollowed areas - which can be seen in both the ground images and the descent image - to correctly match up the overlay.

    Field geologists on Earth create maps like this to assist them in tracking their observations.

  13. 36 CFR 1010.16 - Actions to encourage agency cooperation early in the NEPA process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... cooperation early in the NEPA process. 1010.16 Section 1010.16 Parks, Forests, and Public Property PRESIDIO TRUST ENVIRONMENTAL QUALITY § 1010.16 Actions to encourage agency cooperation early in the NEPA process. Consistent with 40 CFR 1501.6, the Trust may request the NPS to be a cooperating agency for actions...

  14. 36 CFR 1010.16 - Actions to encourage agency cooperation early in the NEPA process.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... cooperation early in the NEPA process. 1010.16 Section 1010.16 Parks, Forests, and Public Property PRESIDIO TRUST ENVIRONMENTAL QUALITY § 1010.16 Actions to encourage agency cooperation early in the NEPA process. Consistent with 40 CFR 1501.6, the Trust may request the NPS to be a cooperating agency for actions...

  15. 49 CFR 552.8 - Notification of agency action on the petition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Notification of agency action on the petition. 552... HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PETITIONS FOR RULEMAKING, DEFECT, AND NONCOMPLIANCE ORDERS General § 552.8 Notification of agency action on the petition. After considering...

  16. 78 FR 40265 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Replacement in... Bridge (Bridge Street over the Mitchell River) Replacement Project in Chatham-Barnstable County... Federal agency actions on the bridge project will be barred unless the claim is filed on or...

  17. 5 CFR 250.101 - Standards and requirements for agency personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... personnel actions. 250.101 Section 250.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies § 250.101... Personnel Management (OPM), the instructions OPM has published in the Guide to Processing Personnel...

  18. 5 CFR 250.101 - Standards and requirements for agency personnel actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... personnel actions. 250.101 Section 250.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies § 250.101... Personnel Management (OPM), the instructions OPM has published in the Guide to Processing Personnel...

  19. 5 CFR 250.101 - Standards and requirements for agency personnel actions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... personnel actions. 250.101 Section 250.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies § 250.101... Personnel Management (OPM), the instructions OPM has published in the Guide to Processing Personnel...

  20. 5 CFR 250.101 - Standards and requirements for agency personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... personnel actions. 250.101 Section 250.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies § 250.101... Personnel Management (OPM), the instructions OPM has published in the Guide to Processing Personnel...

  1. 5 CFR 250.101 - Standards and requirements for agency personnel actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... personnel actions. 250.101 Section 250.101 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT IN AGENCIES Authority for Personnel Actions in Agencies § 250.101... Personnel Management (OPM), the instructions OPM has published in the Guide to Processing Personnel...

  2. 19 CFR 210.78 - Notice of enforcement action to Government agencies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Notice of enforcement action to Government agencies. 210.78 Section 210.78 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS... Opinions § 210.78 Notice of enforcement action to Government agencies. (a) Consultation. The Commission...

  3. 19 CFR 210.78 - Notice of enforcement action to Government agencies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Notice of enforcement action to Government agencies. 210.78 Section 210.78 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS... Opinions § 210.78 Notice of enforcement action to Government agencies. (a) Consultation. The Commission...

  4. 32 CFR 1907.25 - Action on appeal of initial Agency determination.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Action on appeal of initial Agency determination. 1907.25 Section 1907.25 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CHALLENGES TO CLASSIFICATION OF DOCUMENTS BY AUTHORIZED HOLDERS PURSUANT TO SEC. 1.8 OF EXECUTIVE ORDER 13526 Action on Challenges...

  5. 76 FR 37392 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-27

    ... judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before December 27, 2011. If the Federal law that authorizes judicial review of a claim... AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for...

  6. 78 FR 10249 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ...). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before July 13, 2013. If the Federal law that authorizes judicial review... AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for...

  7. 75 FR 62919 - Notice of Final Federal Agency Actions on Proposed Highway in Vermont

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the... that authorizes judicial review of a claim provides a time period of less than 180 days for filing such... AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims for...

  8. 76 FR 80447 - Notice of Final Federal Agency Actions on Proposed Highways in Montana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies. SUMMARY: This notice...(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before June 20, 2012. If the Federal law that authorizes...

  9. 75 FR 28851 - Notice of Final Federal Agency Actions on Proposed Highway in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-24

    ... subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the... this notice. If the Federal law that authorizes judicial review of a claim provides a time period of... AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims for...

  10. 78 FR 58380 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before February 20, 2014. If the Federal law that authorizes judicial review of a claim... AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims for...

  11. 78 FR 64595 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before March 28, 2014. If the Federal law that authorizes judicial review of a... AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for...

  12. 21 CFR 516.123 - Informal conferences regarding agency administrative actions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 6 2013-04-01 2013-04-01 false Informal conferences regarding agency administrative actions. 516.123 Section 516.123 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH....123 Informal conferences regarding agency administrative actions. (a) Should FDA make an...

  13. Research in Action: The Uses of Research in a Social Work Agency.

    ERIC Educational Resources Information Center

    Shireman, Joan F.; Johnson, Penelope R.

    This book describes an action research program in a child welfare agency. The purpose of the program was to evaluate agency services and to disseminate agency thinking and experimenting to other social workers. In the introduction (Part I) the development of the research project is briefly outlined. In Part II the areas in which research was…

  14. 7 CFR 245.11 - Action by State agencies and FNSROs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND FREE MILK IN SCHOOLS § 245.11 Action by State agencies and FNSROs. (a) Each State agency, or FNSRO where applicable, shall, for schools under its jurisdiction: (1) As necessary, each State agency or... provisions of this part. If the State elects to establish for all schools a maximum price for reduced...

  15. 7 CFR 245.11 - Action by State agencies and FNSROs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND FREE MILK IN SCHOOLS § 245.11 Action by State agencies and FNSROs. (a) Each State agency, or FNSRO where applicable, shall, for schools under its jurisdiction: (1) As necessary, each State agency or... provisions of this part. If the State elects to establish for all schools a maximum price for reduced...

  16. Bonneville Power Administration 1997 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  17. 77 FR 26601 - Notice of Final Federal Agency Actions on Proposed Highway in Connecticut

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the North Hillside Road Extension in Mansfield, Connecticut. Those actions grant licenses, permits, and approvals for the...

  18. 76 FR 9632 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California... Review of Actions by California Department of Transportation (Caltrans) pursuant to 23 U.S.C. 327... Bernardino County, State of California. Those actions grant licenses, permits, and approvals for the...

  19. 77 FR 61825 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-11

    ...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, Willow Road (FAP 305) between Illinois Route 43 (Waukegan Road) and Interstate 94 (Edens Expressway) in Cook County, Illinois. Those actions grant licenses, permits, and approvals for the...

  20. 76 FR 51462 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ...: Federal Highway Administration (FHWA), USDOT. ACTION: Notice of Limitation on Claims for Judicial Review... actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions that... the Federal law that authorizes judicial review of a claim provides a time period of less than...

  1. 29 CFR 11.10 - Identification of agency actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... Pursuant to 40 CFR 1506.11, however, OSHA and MSHA will consult with the Council on Environmental Quality... original standard. (iii) Agency legislative requests for appropriations Exempted by 40 CFR 1508.17. (iv) Recordkeeping and reporting requirements No possibility of significant environmental impact. (v) Routine...

  2. 29 CFR 11.10 - Identification of agency actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Pursuant to 40 CFR 1506.11, however, OSHA and MSHA will consult with the Council on Environmental Quality... original standard. (iii) Agency legislative requests for appropriations Exempted by 40 CFR 1508.17. (iv) Recordkeeping and reporting requirements No possibility of significant environmental impact. (v) Routine...

  3. 29 CFR 11.10 - Identification of agency actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... Pursuant to 40 CFR 1506.11, however, OSHA and MSHA will consult with the Council on Environmental Quality... original standard. (iii) Agency legislative requests for appropriations Exempted by 40 CFR 1508.17. (iv) Recordkeeping and reporting requirements No possibility of significant environmental impact. (v) Routine...

  4. 29 CFR 11.10 - Identification of agency actions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Pursuant to 40 CFR 1506.11, however, OSHA and MSHA will consult with the Council on Environmental Quality... original standard. (iii) Agency legislative requests for appropriations Exempted by 40 CFR 1508.17. (iv) Recordkeeping and reporting requirements No possibility of significant environmental impact. (v) Routine...

  5. 78 FR 25524 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... project would improve safety and operations, local road access to State Route 156, interregional traffic flow along State Route 156 and relieve existing congestion. The actions by the Federal agencies,...

  6. 78 FR 70093 - Notice of Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ...This notice announces action taken by the FHWA and other Federal Agencies that is final within the meaning of 23 U.S.C. 139(l)(1). This final agency action relates to a proposed highway project, Bonner Bridge Replacement Project along NC 12, from Rodanthe to Bodie Island in Dare County, North Carolina. The FHWA's Record of Decision (ROD) identifies the Bridge within the Existing NC 12 Easement......

  7. Both Motor Prediction and Conceptual Congruency between Preview and Action-Effect Contribute to Explicit Judgment of Agency

    ERIC Educational Resources Information Center

    Sato, Atsushi

    2009-01-01

    The sense of agency is the sense that one is causing an action. The inferential account of the sense of agency proposes that we experience the sense of agency when we infer that one's own thoughts are the cause of an action. According to this account, the inference occurs when a thought appears in consciousness prior to an action, is consistent…

  8. 21 CFR 25.60 - Environmental effects abroad of major agency actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Environmental effects abroad of major agency... abroad of major agency actions. (a) In accordance with Executive Order 12114, “Environmental Effects Abroad of Major Federal Actions” of January 4, 1979 (44 FR 1957, January 9, 1979), the responsible...

  9. 21 CFR 25.60 - Environmental effects abroad of major agency actions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 1 2013-04-01 2013-04-01 false Environmental effects abroad of major agency... SERVICES GENERAL ENVIRONMENTAL IMPACT CONSIDERATIONS Other Requirements § 25.60 Environmental effects abroad of major agency actions. (a) In accordance with Executive Order 12114, “Environmental...

  10. 21 CFR 25.60 - Environmental effects abroad of major agency actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 1 2011-04-01 2011-04-01 false Environmental effects abroad of major agency... SERVICES GENERAL ENVIRONMENTAL IMPACT CONSIDERATIONS Other Requirements § 25.60 Environmental effects abroad of major agency actions. (a) In accordance with Executive Order 12114, “Environmental...

  11. 21 CFR 25.60 - Environmental effects abroad of major agency actions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 1 2014-04-01 2014-04-01 false Environmental effects abroad of major agency... SERVICES GENERAL ENVIRONMENTAL IMPACT CONSIDERATIONS Other Requirements § 25.60 Environmental effects abroad of major agency actions. (a) In accordance with Executive Order 12114, “Environmental...

  12. 77 FR 55896 - Notice of Final Federal Agency Actions on Loop 1 in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ... Act (FPPA) [7 U.S.C. 4201- 4209]. 7. Wetlands and Water Resources: Clean Water Act (Section 404, Section 401, Section 319) ; Land and Water Conservation Fund (LWCF) ; Safe Drinking Water Act (SDWA) [42 U... Federal Highway Administration Notice of Final Federal Agency Actions on Loop 1 in Texas AGENCY:...

  13. 77 FR 24255 - Notice of Final Federal Agency Actions on Proposed Highways in Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency... October 22, 2012. If the Federal law that authorizes judicial review of a claim provides a time period of... given by the Federal Transit Administration on September 23, 2010 related to U.S. 36 (75 FR 58017)....

  14. Almost Like Being at 'Bonneville'

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The Mars Exploration Rover Spirit took this 3-D navigation camera mosaic of the crater nicknamed 'Bonneville' on the 67th martian day, or sol, of its mission. The rover's solar panels can be seen in the foreground, and just above the far crater rim, on the left side, is the rover's heatshield, which is visible as a tiny reflective speck.

  15. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect

    N /A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  16. 1. SOUTH END AND EAST SIDE, SHOWING BONNEVILLE DAM POWERHOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. SOUTH END AND EAST SIDE, SHOWING BONNEVILLE DAM POWERHOUSE IN BACKGROUND TO RIGHT - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  17. 76 FR 2949 - Notice of Final Federal Agency Actions on Proposed Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... Construction Project in the State of Washington. Those actions grant approval for the project. DATES: By this... Construction Project. The project includes constructing pontoons sufficient to replace the existing traffic... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Project in...

  18. 10 CFR Appendix B to Subpart D of... - Categorical Exclusions Applicable to Specific Agency Actions

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Categorical Exclusions Applicable to Specific Agency Actions B Appendix B to Subpart D of Part 1021 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES Typical Classes of Actions Pt. 1021, Subpt. D, App. B Appendix B to Subpart D of Part...

  19. 77 FR 1782 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Replacement in... within the meaning of 23 U.S.C. 39(l)(1). The action relates to the proposed Fore River Bridge (State... bridge project in the Commonwealth of Massachusetts. The project proposes to replace the...

  20. 77 FR 6622 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Replacement in... within the meaning of 23 U.S.C. 139(l)(1). The action relates to the proposed Whittier Bridge (Interstate... subject to 23 U.S.C. 139(l)(1) by issuing approval for the following bridge/highway improvement project...

  1. 43 CFR 2372.1 - Notice of intention to relinquish action by holding agency.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Notice of intention to relinquish action...) RESTORATIONS AND REVOCATIONS Procedures § 2372.1 Notice of intention to relinquish action by holding agency. (a... intention to relinquish such lands in the proper office (see § 1821.2-1 of this chapter). (b) No...

  2. 76 FR 78332 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... Review of Actions by California Department of Transportation (Caltrans) pursuant to 23 U.S.C. 327... seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before June 13, 2012. If the Federal law that authorizes judicial review of a...

  3. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... notice announces actions taken by the FHWA and the USACE that are final within the meaning of 23 U.S.C... given that the USACE has taken final agency actions within the meaning of 23 U.S.C. Sec. 139(l)(1)...

  4. 75 FR 59787 - Notice of Final Federal Agency Actions on Proposed Highway in New Hampshire

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-28

    ... Agency Actions on the Proposed Highway in New Hampshire'' in the Federal Register at 72 FR 30047-01 for... interchange in the City of Manchester. Those actions grant licenses, permits, and approvals for the project...-mile segment of the Interstate 93 corridor between Salem and Manchester, New Hampshire....

  5. 10 CFR Appendix A to Subpart D of... - Categorical Exclusions Applicable to General Agency Actions

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Categorical Exclusions Applicable to General Agency Actions A Appendix A to Subpart D of Part 1021 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES Typical Classes of Actions Pt. 1021, Subpt. D, App. A Appendix A to Subpart D of Part...

  6. 76 FR 61476 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ...: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial Review of... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review... before April 1, 2012. If the Federal law that authorizes judicial review of a claim provides a...

  7. 75 FR 65052 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-21

    ...The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway interchange project, improvements along State Route 163 (SR-163) at the Friars Road Interchange in the County of San Diego, State of California. Those actions grant licenses,......

  8. 77 FR 48203 - Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139 (I)(1). The actions relate to a proposed highway project, I-77 High Occupancy/Toll (HOT) lanes, from I-277 (Brookshire Freeway) to West Catawba Avenue (Exit 28), Mecklenburg County, North Carolina. Those actions grant licenses, permits, and approvals for the...

  9. The Collaborative Action Research Network: 30 Years of Agency in Developing Educational Action Research

    ERIC Educational Resources Information Center

    Somekh, Bridget

    2010-01-01

    This article provides an analysis of the Collaborative Action Research Network's (CARN) origins and development since its foundation in 1976. The author brings the unique perspective of active involvement in CARN almost from its inception, and editorship for many years of its journal "Educational Action Research". Cultural-historical activity…

  10. The joint Simon effect depends on perceived agency, but not intentionality, of the alternative action

    PubMed Central

    Stenzel, Anna; Dolk, Thomas; Colzato, Lorenza S.; Sellaro, Roberta; Hommel, Bernhard; Liepelt, Roman

    2014-01-01

    A co-actor's intentionality has been suggested to be a key modulating factor for joint action effects like the joint Simon effect (JSE). However, in previous studies intentionality has often been confounded with agency defined as perceiving the initiator of an action as being the causal source of the action. The aim of the present study was to disentangle the role of agency and intentionality as modulating factors of the JSE. In Experiment 1, participants performed a joint go/nogo Simon task next to a co-actor who either intentionally controlled a response button with own finger movements (agency+/intentionality+) or who passively placed the hand on a response button that moved up and down on its own as triggered by computer signals (agency−/intentionality−). In Experiment 2, we included a condition in which participants believed that the co-actor intentionally controlled the response button with a Brain-Computer Interface (BCI) while placing the response finger clearly besides the response button, so that the causal relationship between agent and action effect was perceptually disrupted (agency−/intentionality+). As a control condition, the response button was computer controlled while the co-actor placed the response finger besides the response button (agency−/intentionality−). Experiment 1 showed that the JSE is present with an intentional co-actor and causality between co-actor and action effect, but absent with an unintentional co-actor and a lack of causality between co-actor and action effect. Experiment 2 showed that the JSE is absent with an intentional co-actor, but no causality between co-actor and action effect. Our findings indicate an important role of the co-actor's agency for the JSE. They also suggest that the attribution of agency has a strong perceptual basis. PMID:25140144

  11. I control therefore I do: judgments of agency influence action selection.

    PubMed

    Karsh, N; Eitam, B

    2015-05-01

    Our sense of being agents, that is of willingly controlling both our own bodies and the external environment is ubiquitous if thin. Empirical and theoretical work on this 'sense of agency' has documented motivational, cognitive and neural influences on implicit (out of awareness) and explicit (conscious) judgments of agency. For example, fluency of action selection processes has been recently shown to affect judgments of one's degree of control over an external event. However, it is an open question whether and how such judgments of agency act as input to other processes. In this study we demonstrate that the opposite relationship between action selection and judgment of agency also exists. Specifically, we show that manipulating one's objective control over the environment influences both the speed and the frequency of performing an action associated with that control. This pattern bears a striking resemblance to the effect that tangible rewards have on action selection and suggests that positive control feedback is rewarding to the organism, consequently affecting action selection. If further corroborated this 'reward from control' may explain everyday addictions such as prolonged engagement in arcade games and pathological behaviors, such as stereotypy. PMID:25724007

  12. 75 FR 27384 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ...This notice announces actions taken by the FHWA, USACE, and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project to widen State Route 99 from the existing four-lane facility to six lanes from the Austin Road interchange in the City of Manteca (post mile 4.9) to the Arch Road interchange in the City of Stockton (post......

  13. 41 CFR 302-1.101 - What actions are agencies expected to take concerning the comprehensive, automated relocation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... agencies expected to take concerning the comprehensive, automated relocation management system? 302-1.101... What actions are agencies expected to take concerning the comprehensive, automated relocation..., automated relocation management system....

  14. 41 CFR 302-1.101 - What actions are agencies expected to take concerning the comprehensive, automated relocation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... agencies expected to take concerning the comprehensive, automated relocation management system? 302-1.101... What actions are agencies expected to take concerning the comprehensive, automated relocation..., automated relocation management system....

  15. 41 CFR 302-1.101 - What actions are agencies expected to take concerning the comprehensive, automated relocation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... agencies expected to take concerning the comprehensive, automated relocation management system? 302-1.101... What actions are agencies expected to take concerning the comprehensive, automated relocation..., automated relocation management system....

  16. 76 FR 18548 - Clean Water Act Section 303(d): Final Agency Action on Three Total Maximum Daily Loads (TMDLs) in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... Louisiana AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... an inspection. FOR FURTHER INFORMATION CONTACT: Diane Smith, Environmental Protection...

  17. Sense of agency in joint action: influence of human and computer co-actors.

    PubMed

    Obhi, Sukhvinder S; Hall, Preston

    2011-06-01

    Intentional binding is the perceived shortening of the time between a voluntary action and its consequent effect and has been suggested as an implicit measure of agency. This shortening has been linked to processes underlying action preparation and is also affected by post-movement feedback. Intentional binding has been demonstrated in joint action tasks involving two humans, but it is unknown whether it occurs for tasks involving a human working alongside a non-human partner. This experiment investigated the influence of high-level feedback on the experience of agency and whether binding occurs in human-computer joint action settings. Participants were involved in two versions an action task involving another 'agent'. In one version, two participants (a genuine participant and a confederate) sat side by side, separated by a curtain that prevented vision of the other person. In baseline conditions, both participants were instructed to make a self-paced action and judge the time of the action by reporting the position of a rotating clock-hand on a computer screen. In other baseline conditions, participants judged the time of an auditory tone. In operant conditions, participants made actions and the genuine participant's action was followed 200 ms later by a tone on every trial. To examine the effect of post-movement information on binding and explicit agency judgments, a colour cue was presented on each trial informing participants about which person's action caused the tone. In another version of the task, participants were paired with a computer instead of a human co-actor. Post-movement information affected the genuine participant's explicit agency judgments but had no effect on intentional binding, which always occurred. In the human-computer version, participants never showed binding, even when they explicitly judged that their action had caused the tone. We suggest that human-human partnerships result in the formation of a new 'we' agentic identity, but that

  18. 5 CFR 919.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Do Federal agencies coordinate suspension and debarment actions? 919.620 Section 919.620 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) GOVERNMENTWIDE DEBARMENT AND SUSPENSION...

  19. 5 CFR 919.620 - Do Federal agencies coordinate suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Do Federal agencies coordinate suspension and debarment actions? 919.620 Section 919.620 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) GOVERNMENTWIDE DEBARMENT AND SUSPENSION...

  20. 21 CFR 516.123 - Informal conferences regarding agency administrative actions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 6 2014-04-01 2014-04-01 false Informal conferences regarding agency administrative actions. 516.123 Section 516.123 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS NEW ANIMAL DRUGS FOR MINOR USE AND MINOR SPECIES Index of Legally...

  1. Toward a Psychophysics of Agency: Detecting Gain and Loss of Control over Auditory Action Effects

    ERIC Educational Resources Information Center

    Repp, Bruno H.; Knoblich, Gunther

    2007-01-01

    Theories of agency--the feeling of being in control of one's actions and their effects--emphasize either perceptual or cognitive aspects. This study addresses both aspects simultaneously in a finger-tapping paradigm. The tasks required participants to detect when synchronization of their taps with computer-controlled tones changed to…

  2. 5 CFR 230.401 - Agency authority to take personnel actions in a national emergency disaster.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Agency authority to take personnel actions in a national emergency disaster. 230.401 Section 230.401 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS ORGANIZATION OF THE GOVERNMENT FOR PERSONNEL...

  3. 5 CFR 230.401 - Agency authority to take personnel actions in a national emergency disaster.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Agency authority to take personnel actions in a national emergency disaster. 230.401 Section 230.401 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS ORGANIZATION OF THE GOVERNMENT FOR PERSONNEL...

  4. 5 CFR 230.401 - Agency authority to take personnel actions in a national emergency disaster.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Agency authority to take personnel actions in a national emergency disaster. 230.401 Section 230.401 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS ORGANIZATION OF THE GOVERNMENT FOR PERSONNEL...

  5. 5 CFR 230.401 - Agency authority to take personnel actions in a national emergency disaster.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Agency authority to take personnel actions in a national emergency disaster. 230.401 Section 230.401 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS ORGANIZATION OF THE GOVERNMENT FOR PERSONNEL...

  6. 5 CFR 230.401 - Agency authority to take personnel actions in a national emergency disaster.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Agency authority to take personnel actions in a national emergency disaster. 230.401 Section 230.401 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS ORGANIZATION OF THE GOVERNMENT FOR PERSONNEL...

  7. 21 CFR 25.60 - Environmental effects abroad of major agency actions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 1 2012-04-01 2012-04-01 false Environmental effects abroad of major agency actions. 25.60 Section 25.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ENVIRONMENTAL IMPACT CONSIDERATIONS Other Requirements § 25.60 Environmental...

  8. 75 FR 72862 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... announces actions taken by the FHWA and the USACE that are final within the meaning of 23 U.S.C. 139(l)(1...) and are final within the meaning of that law. A claim seeking judicial review of those Federal agency... Indiana'' in the Federal Register at (75 FR 49547) for the Section 3, 25.73 mile I-69 project in...

  9. 43 CFR 2372.1 - Notice of intention to relinquish action by holding agency.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Notice of intention to relinquish action by holding agency. 2372.1 Section 2372.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) RESTORATIONS AND REVOCATIONS Procedures §...

  10. 43 CFR 2372.1 - Notice of intention to relinquish action by holding agency.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Notice of intention to relinquish action by holding agency. 2372.1 Section 2372.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT...

  11. 76 FR 44649 - Notice of Final Federal Agency Actions on Proposed Highway in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... 1899 ; and Land and Water Conservation Fund . 8. Executive Orders: E.O. 11990 Protection of Wetlands; E... ; Farmland Protection Policy Act [7 U.S.C. 4201-4209]. 7. Wetlands and Water Resources: Clean Water Act [33 U... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Texas...

  12. 78 FR 58381 - Notice of Final Federal Agency Actions on State Highway 288 in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... U.S.C. 4201-4209]. 7. Wetlands and Water Resources: Clean Water Act, 33 U.S.C. 1251- 1387; Land and Water Conservation Fund (LWCF), 16 U.S.C. 4601-4604. 8. Executive Orders: E.O. 11990 Protection of... Federal Highway Administration Notice of Final Federal Agency Actions on State Highway 288 in Texas...

  13. 78 FR 76636 - Agency Information Collection Activities: Consideration of Deferred Action for Childhood Arrivals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-18

    ...: https://egov.uscis.gov/cris/Dashboard.do , or call the USCIS National Customer Service Center at 1-800... be considered for deferred action for childhood arrivals: 1. Were under the age of 31 as of June 15... SECURITY U.S. Citizenship and Immigration Services Agency Information Collection Activities:...

  14. Urban High School Students' Critical Science Agency: Conceptual Understandings and Environmental Actions around Climate Change

    ERIC Educational Resources Information Center

    McNeill, Katherine L.; Vaughn, Meredith Houle

    2012-01-01

    This study investigates how the enactment of a climate change curriculum supports students' development of critical science agency, which includes students developing deep understandings of science concepts and the ability to take action at the individual and community levels. We examined the impact of a four to six week urban ecology curriculum…

  15. 5 CFR 315.803 - Agency action during probationary period (general).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Agency action during probationary period (general). 315.803 Section 315.803 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CAREER AND CAREER-CONDITIONAL EMPLOYMENT Probation on Initial Appoinment to a Competitive...

  16. 5 CFR 315.803 - Agency action during probationary period (general).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Agency action during probationary period (general). 315.803 Section 315.803 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CAREER AND CAREER-CONDITIONAL EMPLOYMENT Probation on Initial Appoinment to a Competitive...

  17. 5 CFR 315.803 - Agency action during probationary period (general).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Agency action during probationary period (general). 315.803 Section 315.803 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CAREER AND CAREER-CONDITIONAL EMPLOYMENT Probation on Initial Appoinment to a Competitive...

  18. 5 CFR 315.803 - Agency action during probationary period (general).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Agency action during probationary period (general). 315.803 Section 315.803 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CAREER AND CAREER-CONDITIONAL EMPLOYMENT Probation on Initial Appoinment to a Competitive...

  19. 5 CFR 315.803 - Agency action during probationary period (general).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Agency action during probationary period (general). 315.803 Section 315.803 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CAREER AND CAREER-CONDITIONAL EMPLOYMENT Probation on Initial Appoinment to a Competitive...

  20. 5 CFR 2606.302 - OGE or other agency action on requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false OGE or other agency action on requests. 2606.302 Section 2606.302 Administrative Personnel OFFICE OF GOVERNMENT ETHICS ORGANIZATION AND... any other procedures which may be required of the data subject in order to process the appeal....

  1. Science youth action research: Promoting critical science literacy through relevance and agency

    NASA Astrophysics Data System (ADS)

    Coleman, Elizabeth R.

    This three-article dissertation presents complementary perspectives on Science Youth Action Research (Sci-YAR), a K-12 curriculum designed to emphasize relevance and agency to promote youth's science learning. In Sci-YAR, youth conduct action research projects to better understand science-related issues in their lives, schools, or communities, while they simultaneously document, analyze, and reflect upon their own practices as researchers. The first article defines Sci-YAR and argues for its potential to enhance youth's participation as citizens in a democratic society. The second article details findings from a case study of youth engaged in Sci-YAR, describing how the curriculum enabled and constrained youth's identity work in service of critical science agency. The third article provides guidance to science teachers in implementing student-driven curriculum and instruction by emphasizing Sci-YAR's key features as a way to promote student agency and relevance in school science.

  2. Collaborative agency to support integrated care for children, young people and families: an action research study

    PubMed Central

    Stuart, Kaz

    2014-01-01

    Abstract Introduction Collaboration was legislated in the delivery of integrated care in the early 2000s in the UK. This research explored how the reality of practice met the rhetoric of collaboration. Theory The paper is situated against a theoretical framework of structure, agency, identity and empowerment. Collectively and contextually these concepts inform the proposed model of ‘collaborative agency’ to sustain integrated care. The paper brings sociological theory on structure and agency to the dilemma of collaboration. Methods Participative action research was carried out in collaborative teams that aspired to achieve integrated care for children, young people and families between 2009 and 2013. It was a part time, PhD study in collaborative practice. Results The research established that people needed to be able to be jointly aware of their context, to make joint decisions, and jointly act in order to deliver integrated services, and proposes a model of collaborative agency derived from practitioner’s experiences and integrated action research and literature on agency. The model reflects the effects of a range of structures in shaping professional identity, empowerment, and agency in a dynamic. The author proposes that the collaborative agency model will support integrated care, although this is, as yet, an untested hypothesis. PMID:24868192

  3. Corrective Action Decision Document, Area 15 Environmental Protection Agency Farm Laboratory Building, Corrective Action Unit No. 95, Revision 0

    SciTech Connect

    1997-08-18

    This report is the Corrective Action Decision Document (CADD) for the Nevada Test Site (NTS) Area 15 U.S. Environmental Protection Agency (EPA) Farm, Laboratory Building (Corrective Action Unit [CAU] No. 95), at the Nevada Test Site, Nye County, Nevada. The scope of this CADD is to identify and evaluate potential corrective action alternatives for the decommissioning and decontamination (D and D) of the Laboratory Building, which were selected based on the results of investigative activities. Based on this evaluation, a preferred corrective action alternative is recommended. Studies were conducted at the EPA Farm from 1963 to 1981 to determine the animal intake and retention of radionuclides. The main building, the Laboratory Building, has approximately 370 square meters (4,000 square feet) of operational space. Other CAUS at the EPA Farm facility that will be investigated and/or remediated through other environmental restoration subprojects are not included in this CADD, with the exception of housekeeping sites. Associated structures that do not require classification as CAUS are considered in the evaluation of corrective action alternatives for CAU 95.

  4. Audit of Bonneville Power Administration`s management of Information Resources

    SciTech Connect

    1996-04-02

    Bonneville Power Administration`s (Bonneville) information resources include computer-related equipment, spare parts, and computer software. The objective of this audit was to determine whether Bonneville acquired and accounted for computer-related equipment properly. We found positive aspects in Bonneville`s management of computer-related equipment. However, improvements could be made in implementing credit card and property procedures. Specifically, we found that improvements were needed to (1) control credit card purchases, (2) ensure that equipment was tagged and included in property records, (3) maintain accountability over spare parts, and (4) identify unused equipment. As a result, about $90,000 of equipment was bought by personnel whose authority to purchase was not properly documented, and about $182,000 of purchases lacked supporting invoices. In addition, one maintenance support group had over $109,000 of spare parts shortages. Furthermore, Bonneville could have saved about $803,000 had unused equipment been redistributed within Bonneville or to other Federal and state agencies. Management concurred with the recommendations to improve internal controls.

  5. Action sounds update the mental representation of arm dimension: contributions of kinaesthesia and agency

    PubMed Central

    Tajadura-Jiménez, Ana; Tsakiris, Manos; Marquardt, Torsten; Bianchi-Berthouze, Nadia

    2015-01-01

    Auditory feedback accompanies almost all our actions, but its contribution to body-representation is understudied. Recently it has been shown that the auditory distance of action sounds recalibrates perceived tactile distances on one’s arm, suggesting that action sounds can change the mental representation of arm length. However, the question remains open of what factors play a role in this recalibration. In this study we investigate two of these factors, kinaesthesia, and sense of agency. Across two experiments, we asked participants to tap with their arm on a surface while extending their arm. We manipulated the tapping sounds to originate at double the distance to the tapping locations, as well as their synchrony to the action, which is known to affect feelings of agency over the sounds. Kinaesthetic cues were manipulated by having additional conditions in which participants did not displace their arm but kept tapping either close (Experiment 1) or far (Experiment 2) from their body torso. Results show that both the feelings of agency over the action sounds and kinaesthetic cues signaling arm displacement when displacement of the sound source occurs are necessary to observe changes in perceived tactile distance on the arm. In particular, these cues resulted in the perceived tactile distances on the arm being felt smaller, as compared to distances on a reference location. Moreover, our results provide the first evidence of consciously perceived changes in arm-representation evoked by action sounds and suggest that the observed changes in perceived tactile distance relate to experienced arm elongation. We discuss the observed effects in the context of forward internal models of sensorimotor integration. Our results add to these models by showing that predictions related to action sounds must fit with kinaesthetic cues in order for auditory inputs to change body-representation. PMID:26074843

  6. 3. GENERAL VIEW LOOKING NORTHEAST, SHOWING ENTRANCE ROAD TO BONNEVILLE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. GENERAL VIEW LOOKING NORTHEAST, SHOWING ENTRANCE ROAD TO BONNEVILLE PROJECT; AUDITORIUM IS VISIBLE IN CENTER BACKGROUND. - Bonneville Project, Columbia River, 1 mile Northeast of Exit 40, off Interstate 84, Bonneville, Multnomah County, OR

  7. 36. photographer unknown 7 October 1940 AERIAL VIEW OF BONNEVILLE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. photographer unknown 7 October 1940 AERIAL VIEW OF BONNEVILLE PROJECT LOOKING WEST. - Bonneville Project, Columbia River, 1 mile Northeast of Exit 40, off Interstate 84, Bonneville, Multnomah County, OR

  8. 33. photographer unknown 15 October 1936 PANORAMA OF BONNEVILLE PROJECT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. photographer unknown 15 October 1936 PANORAMA OF BONNEVILLE PROJECT WITH LOCK AND ORIGINAL POWERHOUSE NEARLY COMPLETE AND SPILLWAY UNDER CONSTRUCTION. - Bonneville Project, Columbia River, 1 mile Northeast of Exit 40, off Interstate 84, Bonneville, Multnomah County, OR

  9. 76 FR 54288 - Notice of Final Federal Agency Actions on Proposed Bridge and Approach Roadways in Nevada and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Bridge and Approach... proposed Laughlin-Bullhead City Bridge project in Laughlin, Clark County, Nevada; and in Bullhead City... claim seeking judicial review of the Federal agency actions on the bridge and roadway project will...

  10. 75 FR 53735 - Notice of Final Federal Agency Actions on East Lake Sammamish Master Plan Trail in King County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies. SUMMARY: This notice... seeking judicial review of the Federal agency actions on the transportation project will be barred unless the claim is filed on or before February 28, 2011. If the Federal law that authorizes judicial...

  11. Saying Goodbye to 'Bonneville' Crater

    NASA Technical Reports Server (NTRS)

    2004-01-01

    [figure removed for brevity, see original site] Annotated Image

    NASA's Mars Exploration Rover Spirit took this panoramic camera image on sol 86 (March 31, 2004) before driving 36 meters (118 feet) on sol 87 toward its future destination, the Columbia Hills. This is probably the last panoramic camera image that Spirit will take from the high rim of 'Bonneville' crater, and provides an excellent view of the ejecta-covered path the rover has journeyed thus far. The lander can be seen toward the upper right of the frame and is approximately 321 meters (1060 feet) away from Spirit's current location. The large hill on the horizon is Grissom Hill. The Colombia Hills, located to the left, are not visible in this image.

  12. Visual Feedback Dominates the Sense of Agency for Brain-Machine Actions

    PubMed Central

    Evans, Nathan; Gale, Steven; Schurger, Aaron; Blanke, Olaf

    2015-01-01

    Recent advances in neuroscience and engineering have led to the development of technologies that permit the control of external devices through real-time decoding of brain activity (brain-machine interfaces; BMI). Though the feeling of controlling bodily movements (sense of agency; SOA) has been well studied and a number of well-defined sensorimotor and cognitive mechanisms have been put forth, very little is known about the SOA for BMI-actions. Using an on-line BMI, and verifying that our subjects achieved a reasonable level of control, we sought to describe the SOA for BMI-mediated actions. Our results demonstrate that discrepancies between decoded neural activity and its resultant real-time sensory feedback are associated with a decrease in the SOA, similar to SOA mechanisms proposed for bodily actions. However, if the feedback discrepancy serves to correct a poorly controlled BMI-action, then the SOA can be high and can increase with increasing discrepancy, demonstrating the dominance of visual feedback on the SOA. Taken together, our results suggest that bodily and BMI-actions rely on common mechanisms of sensorimotor integration for agency judgments, but that visual feedback dominates the SOA in the absence of overt bodily movements or proprioceptive feedback, however erroneous the visual feedback may be. PMID:26066840

  13. 41 CFR 102-75.515 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for an educational or public health requirement? 102-75.515 Section 102-75.515 Public Contracts and Property Management Federal Property Management...

  14. 41 CFR 102-75.515 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... educational or public health requirement? 102-75.515 Section 102-75.515 Public Contracts and Property... Health Purposes § 102-75.515 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for an educational or public health requirement? When...

  15. 41 CFR 102-75.515 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for an educational or public health requirement? 102-75.515 Section 102-75.515 Public Contracts and Property Management Federal Property Management...

  16. 41 CFR 102-75.515 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... educational or public health requirement? 102-75.515 Section 102-75.515 Public Contracts and Property... Health Purposes § 102-75.515 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for an educational or public health requirement? When...

  17. 41 CFR 102-75.515 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... educational or public health requirement? 102-75.515 Section 102-75.515 Public Contracts and Property... Health Purposes § 102-75.515 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for an educational or public health requirement? When...

  18. 41 CFR 102-75.585 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-help housing or housing assistance requirement? 102-75.585 Section 102-75.585 Public Contracts and...-Help Housing Or Housing Assistance § 102-75.585 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for a self-help housing or...

  19. 41 CFR 102-75.585 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-help housing or housing assistance requirement? 102-75.585 Section 102-75.585 Public Contracts and...-Help Housing Or Housing Assistance § 102-75.585 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for a self-help housing or...

  20. 41 CFR 102-75.585 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-help housing or housing assistance requirement? 102-75.585 Section 102-75.585 Public Contracts and...-Help Housing Or Housing Assistance § 102-75.585 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for a self-help housing or...

  1. 41 CFR 102-75.585 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-help housing or housing assistance requirement? 102-75.585 Section 102-75.585 Public Contracts and...-Help Housing Or Housing Assistance § 102-75.585 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for a self-help housing or...

  2. 41 CFR 102-75.585 - What action must the disposal agency take after an eligible public agency has submitted a plan of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-help housing or housing assistance requirement? 102-75.585 Section 102-75.585 Public Contracts and...-Help Housing Or Housing Assistance § 102-75.585 What action must the disposal agency take after an eligible public agency has submitted a plan of use for property for a self-help housing or...

  3. Bonneville Power Administration 1993 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-01-01

    For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

  4. 76 FR 20807 - Notice of Final Federal Agency Actions on the Sellwood Bridge Project, SE Tacoma Street and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ...), Department of Transportation. ACTION: Notice of limitation on claims for judicial review of actions by FHWA... subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions that are... Federal law that authorizes judicial review of a claim provides a time period of less than 180 days...

  5. Bonneville, Power Administration Timing System

    NASA Technical Reports Server (NTRS)

    Martin, Kenneth E.

    1996-01-01

    Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

  6. Environmental audit, Bonneville Power Administration, lower Columbia area

    SciTech Connect

    Not Available

    1990-11-01

    This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

  7. 77 FR 15096 - Bonneville Power Administration; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... Energy Regulatory Commission Bonneville Power Administration; Notice of Compliance Filing Take notice that on March 6, 2012, the Bonneville Power Administration (Bonneville) submitted a compliance filing.... Bonneville Power Admin., 137 FERC ] 61,185 (2011) (``Order''). Any person desiring to intervene or to...

  8. Development of the Updated Environmental Protection Agency Manual of Protective Action Guides (PAGS) and Protective Actions for Nuclear Incidents

    SciTech Connect

    Carter, L.M.

    2008-07-01

    As a student intern with the United States Environmental Protection Agency (EPA) Headquarters, the author was trained in the National Response Plan (NRP) and assisted in the editing of the new (unpublished) EPA Protective Action Guides (PAGs) [1] which has been revised in light of the perceived post 9/11 potential for 'Dirty Bomb' and 'Improvised Nuclear Device' attacks on civilian areas. Technical aspects and the public policy aspects of developing the new guides are discussed. Early Phase initial responses discussed include: Notification of state and/or local authorities, immediate evacuation/sheltering prior to release information or measurements, monitoring of releases and exposure rate measurements, estimation of dose consequences, implementation of protective actions in other areas. The new PAG clarifies the use of 1992 PAGs [2] for incidents other than nuclear power plant accidents, lowers projected thyroid dose for potassium iodine (KI), provides drinking water guidance, includes guidance for long-term site restoration, and updates dosimetry from ICRP 26 to ICRP 60. (authors)

  9. 41 CFR 302-1.101 - What actions are agencies expected to take concerning the comprehensive, automated relocation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... expected to take concerning the comprehensive, automated relocation management system? 302-1.101 Section... What actions are agencies expected to take concerning the comprehensive, automated relocation..., automated relocation management system....

  10. 2 CFR 180.610 - What procedures does a Federal agency use in suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false What procedures does a Federal agency use in suspension and debarment actions? 180.610 Section 180.610 Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET GOVERNMENTWIDE GUIDANCE FOR GRANTS AND AGREEMENTS Reserved OMB GUIDELINES TO AGENCIES ON GOVERNMENTWIDE DEBARMENT AND SUSPENSION...

  11. "What Happened to Our Sense of Justice?" Tracing Agency and Critical Engagement in a Youth Participatory Action Research Project

    ERIC Educational Resources Information Center

    Giraldo-García, Regina J.; Galletta, Anne

    2015-01-01

    Tracing the nature of critical engagement and agency among youth in a participatory action research (PAR) collective, the study attends to the manner in which critical engagement and agency developed over time for the youth researchers. The focus of the project was to conduct a survey among ninth grade students concerning their early high school…

  12. 22 CFR 208.635 - May the U.S. Agency for International Development settle a debarment or suspension action?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false May the U.S. Agency for International... INTERNATIONAL DEVELOPMENT GOVERNMENTWIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT) General Principles Relating to Suspension and Debarment Actions § 208.635 May the U.S. Agency for International...

  13. 22 CFR 208.635 - May the U.S. Agency for International Development settle a debarment or suspension action?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false May the U.S. Agency for International... INTERNATIONAL DEVELOPMENT GOVERNMENTWIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT) General Principles Relating to Suspension and Debarment Actions § 208.635 May the U.S. Agency for International...

  14. [Social Cognition and the Sense of Agency in Autism: From Action to Interaction].

    PubMed

    Lafleur, Alexis; Soulières, Isabelle; Forgeot d'Arc, Baudoin

    2016-01-01

    The sense of agency (SoA) refers to the ability for one to detect that she is the cause of an action (Gallagher, 2000). The SoA is linked to motor control but also to self-awareness and could play an important role in social interactions. Autism spectrum disorder (ASD) is characterized by an alteration of social interactions and communication (DSM-5; APA, 2013) and is often seen as a primary deficit of functions specific to social cognition. However, motor control is also altered in ASD. We hypothesize that motor symptoms and social impairments could both arise from the same alteration of SoA. We first introduce theoretical models of implicit and explicit SoA (Synofzik et al., 2008) and present their neurofunctional basis. Then, we assess the clinical expressions of a disrupted SoA in different neuropsychiatric disorders such as schizophrenia. In ASD, the atypical formation of internal models of action during motor acquisition (Haswell et al., 2009) could be at the source of an altered implicit SoA. A lack of fidelity of sensorimotor agency cues (Zalla et al., 2015) could also entail an alteration of explicit SoA. We discuss the main clinical expressions of ASD that may ensue from a disrupted SoA (difficulties in theory of mind and imitation, deficits in motor coordination and praxis, etc.). PMID:27570956

  15. 78 FR 77477 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Action on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... Register on September 23, 2011, FR Doc. 2011-24504, page 59125, and in the FHWA/FTA ROD issued on December... January 5, 2012, FR Doc. 2011-33784, pages 531- 532, by the FHWA and FTA regarding environmental actions... the Interstate 5 Bridge across the Columbia River AGENCY: Coast Guard, DHS. ACTION: Notice...

  16. 76 FR 45649 - Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange Project: Jackson County, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... Federal Highway Administration Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange... the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, I-5: Fern Valley... Administration, 530 Center Street, NE., Suite 420, Salem, Oregon 97301, Telephone: (503) 316-2559. The I-5:...

  17. 77 FR 65929 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River.... Sec. 139(l)(1). The actions relate to the Tappan Zee Hudson River Crossing Project located in Rockland... the following highway project in the State of New York: Tappan Zee Hudson River Crossing...

  18. 78 FR 27473 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... (New NY Bridge) Project in New York, in the Federal Register at FR Doc. 2012-26799. Tappan Zee Hudson... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River... within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the Tappan Zee Hudson River...

  19. 78 FR 42151 - Notice of Final Federal Agency Actions on the Goethals Bridge Replacement Project in New York and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Goethals Bridge Replacement... meaning of 23 U.S.C. 139(l)(1). The actions relate to the Goethals Bridge Replacement Project located in... New York and New Jersey: Goethals Bridge Replacement Project. The Goethals Bridge provides a...

  20. 78 FR 26104 - Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Federal Highway Administration Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road... project, OR 62: I-5 to Dutton Road (Medford) in Jackson County, Oregon. This action grants approval for...: (503) 231-6179. The OR62: I-5 to Dutton Road Environmental Impact Statement (EIS) is available...

  1. 76 FR 26336 - Notice of Final Federal Agency Actions on the Proposed Klingle Valley Trail in Washington, DC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Proposed Klingle Valley Trail...)(1). The actions relate to the proposed Klingle Valley Trail project in Northwest Washington, DC... Northwest Washington, DC: The Klingle Valley Trail project. The project includes construction of a...

  2. 78 FR 23630 - Notice of Final Federal Agency Actions on State Highway 99 (Segment C) in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    .... 1251- 1342; Land and Water Conservation Fund (LWCF), 16 U.S.C. 4601-4604. 8. Executive Orders: E.O... Texas AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for...) to SH 288 in Fort Bend and Brazoria Counties, Texas. Those actions grant licenses, permits,...

  3. 76 FR 68810 - Notice of Final Federal Agency Actions on Farm-to-Market 1626 in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ... and Water Resources: Clean Water Act [33 U.S.C. 1251- 1342]; Land and Water Conservation Fund (LWCF... Federal Highway Administration Notice of Final Federal Agency Actions on Farm-to-Market 1626 in Texas... Lane in Hays and Travis Counties, Texas. Those actions grant licenses, permits, and approvals for...

  4. 77 FR 34456 - Notice of Final Federal Agency Actions on the Newberg Dundee Bypass Project Project: Yamhill and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ...: Notice of Limitations on Claims for Judicial Review of Actions by FHWA. SUMMARY: This notice announces... seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before December 10, 2012. If the Federal law that authorizes judicial review of...

  5. 78 FR 58382 - Notice of Final Federal Agency Actions on the Proposed U.S. 50 Study Crossing Over Sinepauxent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The action relates to the U.S. 50 Crossing over Sinepauxent Bay Study from MD 611 to MD 378 and 5th Street to Somerset Street located in the Town of Ocean City, Worcester County, Maryland. This action grants approval for the...

  6. Explicit Agency in Patients with Cervical Dystonia: Altered Recognition of Temporal Discrepancies between Motor Actions and Their Feedback

    PubMed Central

    Delorme, Cécile; Roze, Emmanuel; Grabli, David; Mayer, Jean-Michel; Degos, Bertrand; Vidailhet, Marie; Worbe, Yulia

    2016-01-01

    Background Abnormalities in the cognitive processing of movement have been demonstrated in patients with dystonia. The sense of agency, which is the experience of initiating and controlling one’s own actions, has never before been studied in these patients. Objectives We investigated whether the sense of agency is altered in patients with cervical dystonia. Methods We used an explicit metacognitive agency task in which participants had to catch targets with a cursor by moving a computer’s mouse. The task included several conditions in which the control over the cursor could be disrupted by adding a spatial or a temporal discrepancy between the mouse and the cursor’s movements. Participants had to acknowledge these discrepancies and reflect them in metacognitive judgements of agency. Results Twenty cervical dystonia patients and 20 matched controls were included in the study. Despite performing equally well as the matched controls, cervical dystonia patients did not fully recognize alterations of agency when a temporal lag was added between their movement and the visual feedback. Moreover, they relied predominantly on their perceived performance to provide judgements of agency and less on their objective degree of controls. There was no correlation between agency scores and clinical severity of dystonia measured by the Toronto Western Spasmodic Torticollis Rating Scale. Conclusion We demonstrated an abnormal processing of agency in cervical dystonia patients, even for motor actions not affected by dystonia. The exact contribution of abnormal agency to dystonia pathophysiology remains to be clarified. PMID:27575487

  7. 77 FR 26275 - Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ...: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS) and notice of floodplain and wetlands involvement. SUMMARY: BPA intends to... reinforcements of five existing BPA substations, placement of new conductor on sections of an existing...

  8. 76 FR 49763 - Bonneville Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Bonneville Power Administration; Notice of Filing Take notice that on August 1, 2011, the Bonneville Power Administration submitted its Proposed 2012 Wholesale Power...

  9. Bonneville Power Administration 1998 Annual Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1998-01-01

    This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

  10. 75 FR 10015 - Notice of Final Federal Agency Actions on the Interchange of State Loop 1604 and United States...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, the interchange of Texas State Loop 1604 (LP 1604) with United States Highway 281 (US 281). Project limits on LP 1604 are from Bitters Road to Redland Road and on US 281 are from LP 1604 to Bitters Road in Bexar......

  11. 75 FR 80107 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Actions on Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Statute of Limitations on Claims; Notice of Final Federal Agency...: Notice of Limitation on Claims for Judicial Review of Actions by the California Department...

  12. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock... a proposed highway project, Sunrise Project, I-205 to Rock Creek Junction, Clackamas County, Oregon..., NE., Suite 100, Salem, Oregon 97301, Telephone: (503) 587-4716. The Sunrise Project, I-205 to...

  13. 75 FR 60164 - Notice of Final Federal Agency Actions on Proposed Shared-Use Path in New York State

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... relate to a proposed Shared-Use Path Construction Project: PIN 4760.35 Auburn Trail Extension, Town of... the connection to Powder Mills Park of 2.5 miles. The project primarily provides for the construction... project. DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23...

  14. 77 FR 66215 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York Correction In notice document 2012-26799, appearing on page 65929 in the...

  15. 77 FR 71207 - Notice of Final Federal Agency Actions on Proposed Highway and Bridge in the Cities of Cincinnati...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-29

    ... on November 2, 2012, at 77 FR 66215. That notice provided an incorrect reference to a statute of...: (513) 933-6639. SUPPLEMENTARY INFORMATION: On November 2, 2012, at 77 FR 66215, the FHWA published a... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway and Bridge...

  16. 77 FR 39795 - Notice of Final Federal Agency Actions on the Interstate 395 High Occupancy (HOV) Vehicle Ramp at...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... Occupancy (HOV) Vehicle Ramp at Seminary Road Project in Virginia AGENCY: Federal Highway Administration...). The actions relate to the Interstate 395 High Occupancy Vehicle (HOV) Ramp at Seminary Road project in... 395 High Occupancy Vehicle (HOV) Ramp at Seminary Road. The project would involve construction of...

  17. 75 FR 62919 - Notice of Final Federal Agency Actions on the Route 250 Bypass Interchange at McIntire Road...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... at McIntire Road Project in Virginia AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... the Route 250 Bypass Interchange at McIntire Road project in the City of Charlottesville, Virginia... approvals for the following project in the State of Virginia: Route 250 Bypass Interchange at McIntire...

  18. 75 FR 25309 - Notice of Final Federal Agency Actions on Proposed Expanded Intermodal Freight Terminal in Michigan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Freight Terminal in Michigan AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of... Yard, also known as the Detroit Intermodal Freight Terminal (DIFT) and associated external-to-terminal... following expansion project in the State of Michigan: Detroit Intermodal Freight Terminal. The...

  19. 75 FR 3277 - Notice of Final Federal Agency Actions on State Highway 99 (Segment F-2) in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... Protection Policy Act (FPPA) [7 U.S.C. 4201-4209]. 7. Wetlands and Water Resources: Clean Water Act [33 U.S.C. 1251- 1342]; Land and Water Conservation Fund (LWCF) . 8. Executive Orders: E.O. 11990 Protection of... Texas AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims...

  20. 75 FR 45695 - Final Federal Agency Actions on Trans-Texas Corridor 35 (TTC-35) in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... Policy Act (FPPA) [7 U.S.C. 4201-4209]. 7. Wetlands and Water Resources: Clean Water Act, 33 U.S.C. 1251- 1342; Land and Water Conservation Fund (LWCF), 16 U.S.C. 4601-4604. 8. Executive Orders: E.O. 11990... Federal Highway Administration Final Federal Agency Actions on Trans-Texas Corridor 35 (TTC-35) in...

  1. Legacy Panorama on Spirit's Way to 'Bonneville'

    NASA Technical Reports Server (NTRS)

    2005-01-01

    [figure removed for brevity, see original site] Click on the image for Legacy Panorama on Spirit's Way to 'Bonneville' (QTVR)

    This view captured by the panoramic camera on NASA's Mars Exploration Rover Spirit nearly a year ago is called Spirit's 'Legacy' panorama. It combines many frames acquired during Spirit's 59th through 61st martian days, or sols (March 3 to 5, 2004) from a position about halfway between the landing site and the rim of 'Bonneville Crater.' The location is within the transition from the relatively smooth plains to the more rocky and rugged blanket of material ejected from Bonneville by the force of the impact that dug the crater.

    The panorama spans 360 degrees and consists of images obtained in 78 individual pointings. The camera took images though 5 different filter at each pointing. This mosaic is an approximately true-color rendering generated using the images acquired through filters centered at wavelengths of 750, 530, and 480 nanometers.

    The Columbia Memorial Station lander can be seen about 200 meters (about 650 feet) in the distance by following the rover tracks back toward right of center in the mosaic and zooming in.

  2. 78 FR 52999 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... Review of Actions by FHWA and United States Fish and Wildlife Service (USFWS), DOI. ] SUMMARY: This... Actions by FHWA and United States Fish and Wildlife Service (USFWS), DOI, was published in the Federal... Judicial Review of these actions and decisions by the USFWS, DOI, was published in the Federal Register...

  3. 76 FR 60583 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... Review of Actions by FHWA and United States Fish and Wildlife Service (USFWS), DOI. SUMMARY: This notice... Actions by FHWA and United States Fish and Wildlife Service (USFWS), DOI, was published in the Federal... these actions and decisions by the USFWS, DOI, was published in the Federal Register on April 17,...

  4. 43 CFR 1610.5-7 - Situations where action can be taken based on another agency's plan, or a land use analysis.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... on another agency's plan, or a land use analysis. 1610.5-7 Section 1610.5-7 Public Lands: Interior... action can be taken based on another agency's plan, or a land use analysis. These regulations authorize.... The Field Manager may use the plans or the land use analysis of other agencies when split or...

  5. 43 CFR 1610.5-7 - Situations where action can be taken based on another agency's plan, or a land use analysis.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... on another agency's plan, or a land use analysis. 1610.5-7 Section 1610.5-7 Public Lands: Interior... action can be taken based on another agency's plan, or a land use analysis. These regulations authorize.... The Field Manager may use the plans or the land use analysis of other agencies when split or...

  6. 43 CFR 1610.5-7 - Situations where action can be taken based on another agency's plan, or a land use analysis.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... on another agency's plan, or a land use analysis. 1610.5-7 Section 1610.5-7 Public Lands: Interior... action can be taken based on another agency's plan, or a land use analysis. These regulations authorize.... The Field Manager may use the plans or the land use analysis of other agencies when split or...

  7. 43 CFR 1610.5-7 - Situations where action can be taken based on another agency's plan, or a land use analysis.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... on another agency's plan, or a land use analysis. 1610.5-7 Section 1610.5-7 Public Lands: Interior... action can be taken based on another agency's plan, or a land use analysis. These regulations authorize.... The Field Manager may use the plans or the land use analysis of other agencies when split or...

  8. 9. photographer unknown 3 September 1984 AERIAL VIEW OF BONNEVILLE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. photographer unknown 3 September 1984 AERIAL VIEW OF BONNEVILLE PROJECT TAKEN AT 3000-FOOT ELEVATION. FISH HATCHERY IS AT CENTER/RIGHT AND AUDITORIUM AND ADMINISTRATION BUILDINGS AT CENTER/LEFT. INTERSTATE ROUTE 84 RUNS ACROSS TOP OF PHOTO. THE COLUMBIA RIVER IS AT BOTTOM OF PHOTO AND FLOWS LEFT-TO-RIGHT. - Bonneville Project, Columbia River, 1 mile Northeast of Exit 40, off Interstate 84, Bonneville, Multnomah County, OR

  9. 11. photographer unknown 3 September 1984 AERIAL VIEW OF BONNEVILLE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. photographer unknown 3 September 1984 AERIAL VIEW OF BONNEVILLE PROJECT TAKEN AT 6000-FOOT ELEVATION. POWERHOUSE #1 AND NAVIGATION LOCK ARE IN UPPER/CENTER PART OF PHOTO, AND THE DAM/SPILLWAY IS IN LEFT/CENTER; THE SECOND POWERHOUSE IS PARTIALLY VISIBLE IN LOWER LEFT CORNER. COLUMBIA RIVER FLOWS FROM LEFT-TO-RIGHT. - Bonneville Project, Columbia River, 1 mile Northeast of Exit 40, off Interstate 84, Bonneville, Multnomah County, OR

  10. 10. photographer unknown 3 September 1984 AERIAL VIEW OF BONNEVILLE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. photographer unknown 3 September 1984 AERIAL VIEW OF BONNEVILLE PROJECT TAKEN AT 3000-FOOT ELEVATION. POWERHOUSE #1 IS IN CENTER OF PHOTO WITH NAVIGATION LOCK JUST ABOVE IT, AND DAM/SPILLWAY IS PARTIALLY VISIBLE AT EXTREME LOWER LEFT. THE COLUMBIA RIVER IS FLOWING LEFT-TO-RIGHT. - Bonneville Project, Columbia River, 1 mile Northeast of Exit 40, off Interstate 84, Bonneville, Multnomah County, OR

  11. 7 CFR 246.18 - Administrative review of State agency actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR... review procedures. The State agency must develop procedures for a full administrative review of the... listed in paragraph (a)(1)(ii) of this section, the State agency must develop procedures for...

  12. Bonneville Power Administration Site Environmental Report, 1991.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-06-01

    In 1991, in order to provide BPA`s management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA`s findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  13. Bonneville Power Administration 1991 site environmental report

    SciTech Connect

    Not Available

    1992-06-01

    In 1991, in order to provide BPA's management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA's findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  14. 75 FR 18253 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ...The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, State Route 28 between State Route 267 and Chipmunk Street in the community of Kings Beach, in the County of Placer, State of California. Those actions grant licenses, permits, and approvals for......

  15. 75 FR 43611 - Notice of Final Federal Agency Actions on Proposed Highway in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ...This notice announces actions taken by FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, the SR 502 Corridor Widening Project, in the State of Washington. Those actions grant approval for the project. The project will widen the existing two-lane roadway to four travel lanes with a median for a 5-mile segment of SR 502 between NE......

  16. 78 FR 28282 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ...The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans, USACE and USFWS that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed State Route 41 Madera Passing Lanes project 0.3 miles north of Road 208 to 2.2 miles north of Road 208 in Madera County, in the State of California. Those actions grant licenses, permits, and......

  17. 75 FR 75721 - Notice of Final Federal Agency Actions on Proposed Highway in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ...This notice announces actions taken by FHWA that are final within the meaning of 23 U.S.C. 139(1)(1). The actions relate to a proposed highway project, the WIS 23 Corridor Expansion Project, in the State of Wisconsin. Those actions grant approval for the project. The project will widen the existing two-lane roadway to four travel lanes with a median for an 18.6-mile segment of WIS 23 between......

  18. 78 FR 64593 - Notice of Final Federal Agency Actions on US 26: MP 49.20-MP 57.45 Project: Clackamas County, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ...This notice announces final environmental actions taken by the FHWA, USACE, USFS, USF&WS, NMFS and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, US 26: MP 49.20-MP 57.45. This action grants approval for the...

  19. 21 CFR 516.123 - Informal conferences regarding agency administrative actions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Director of the Center for Veterinary Medicine or his or her designee, excluding the Director of the Office... response to that decision. (g) Internal agency review of a decision must be based on the information in...

  20. 75 FR 49547 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... 25, 2010 (75 FR 8786-01). A claim seeking judicial review of the Tier 2, Section 3 decisions must be... Review of Actions by FHWA, United States Fish and Wildlife Service (USFWS), DOI, and United States Army... Notice of Limitation on Claims for Judicial Review of these actions and decisions by the USFWS, DOI,...

  1. 75 FR 8786 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... Review of Actions by FHWA and United States Fish and Wildlife Service (USFWS), DOI. SUMMARY: This notice... States Fish and Wildlife Service (USFWS), DOI, was published in the Federal Register on April 17, 2007. A... Notice of Limitation on Claims for Judicial Review of these actions and decisions by the USFWS, DOI,...

  2. 77 FR 56639 - Bonneville Power Administration; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... Energy Regulatory Commission Bonneville Power Administration; Notice of Petition for Declaratory Order... Bonneville Power Administration (Bonneville), submitted certain amendments to its Open Access Transmission Tariff (tariff) and a Petition for Declaratory Order requesting the Commission find that...

  3. 78 FR 11267 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... laws under which such actions were taken, are described in the Final Environmental Assessment (FEA) for..., and in other documents in the FHWA project records. The FEA, FONSI, and other project records...

  4. 77 FR 14464 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ...-94, I-894, and U.S. Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin. Those actions grant.... Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin, Project I.D. 1060-33-01. The project...

  5. Bonneville Project: CFD of the Spillway Tailrace

    SciTech Connect

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Romero Gomez, Pedro DJ

    2012-11-19

    US Army Corps of Engineers, Portland District (CENWP) operates the Bonneville Lock and Dam Project on the Columbia River. High spill flows that occurred during 2011 moved a large volume of rock from downstream of the spillway apron to the stilling basin and apron. Although 400 cubic yards of rocks were removed from the stilling basin, there are still large volumes of rock downstream of the apron that could, under certain flow conditions, move upstream into the stilling basin. CENWP is investigating operational changes that could be implemented to minimize future movement of rock into the stilling basin. A key analysis tool to develop these operational changes is a computational fluid dynamics (CFD) model of the spillway. A free-surface CFD model of the Bonneville spillway tailrace was developed and applied for four flow scenarios. These scenarios looked at the impact of flow volume and flow distribution on tailrace hydraulics. The simulation results showed that areas of upstream flow existed near the river bed downstream of the apron, on the apron, and within the stilling basin for all flows. For spill flows of 300 kcfs, the cross-stream and downstream extent of the recirculation zones along Cascade and Bradford Island was very dependent on the spill pattern. The center-loaded pattern had much larger recirculation zones than the flat or bi-modal pattern. The lower flow (200 kcfs) with a flat pattern had a very large recirculation zone that extended half way across the channel near the river bed. A single flow scenario (300 kcfs of flow in a relatively flat spill pattern) was further interrogated using Lagrangian particle tracking. The tracked particles (with size and mass) showed the upstream movement of sediments onto the concrete apron and against the vertical wall between the apron and the stilling basin from seed locations downstream of the apron and on the apron.

  6. 78 FR 77696 - Agency Information Collection Activities: Consideration of Deferred Action for Childhood Arrivals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    ... Homeland Security, U.S. Citizenship and Immigration Services (USCIS) published a 60-day Notice of Information Collection in the Federal Register at 78 FR 76636, requesting public comments in connection with... SECURITY U.S. Citizenship and Immigration Services Agency Information Collection Activities:...

  7. 36 CFR 1236.26 - What actions must agencies take to maintain electronic information systems?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... take to maintain electronic information systems? 1236.26 Section 1236.26 Parks, Forests, and Public... electronic information systems? (a) Agencies must maintain inventories of electronic information systems and... electronic information systems that is adequate to: (1) Specify all technical characteristics necessary...

  8. 77 FR 49451 - Agency Information Collection Activities: Consideration of Deferred Action for Childhood Arrivals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-16

    .../Dashboard.do , or call the USCIS National Customer Service Center at 1-800-375-5283. Written comments and... for childhood arrivals: 1. Were under the age of 31 as of June 15, 2012; 2. Came to the United States... SECURITY U.S. Citizenship and Immigration Services Agency Information Collection Activities:...

  9. 76 FR 16470 - Notice of Final Federal Agency Actions on Proposed Highway in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... contacting FHWA or the Wisconsin Department of Transportation, Northeast Region, Green Bay office at the... Vanderperren Way, Green Bay, WI 54324-0080. This notice applies to all Federal agency decisions as of the... Water Conservation Fund ; Safe Drinking Water Act ; TEA-21 Wetlands Mitigation [23 U.S.C....

  10. Participatory change in a campaign led by sex workers: connecting resistance to action-oriented agency.

    PubMed

    Basu, Ambar; Dutta, Mohan J

    2008-01-01

    Studies predict that the number of HIV infections among commercial sex workers (CSWers) in India may rise to 3.93 million. Efforts have been made to stem the tide. But most campaigns have been designed to ensure condom compliance among CSWers by spreading awareness and increasing availability. Absent from the discursive space of such campaigns are the agency of CSWers and their ability to resist dominant social structures. The authors respond to this lacuna in health communication by foregrounding voices of CSWers participating in two HIV/AIDS interventions in India. Based on the culture-centered approach to health communication and subaltern studies theory, it examines data from two sites to analyze how communicative narratives of agency and resistance are enacted in the marginalized lives of sex workers. PMID:18174539

  11. Epistemological Agency: A Necessary Action-in-Context Perspective on New Employee Workplace Learning

    ERIC Educational Resources Information Center

    Smith, Ray

    2006-01-01

    This paper discusses research premised on the view that new employees' necessary learning actions may be said to constitute a socio-cultural constructivist epistemology of necessity. It examines the work and learning activities of three new employees during their first months at a wholesale fruit and vegetable company. It proposes that what new…

  12. Creative Expressions of Agency: Contemplating Youth Voice and Adult Roles in Participatory Action Research

    ERIC Educational Resources Information Center

    Jones, Vanessa; Stewart, Carmine; Galletta, Anne; Ayala, Jennifer

    2015-01-01

    The chapter examines youth participation within three intergenerational collectives using participatory action research (PAR) to address educational policies youth viewed as counterproductive to their education. Outlining the complexity of youth voice, the multiple vehicles within the arts through which youth voice is expressed, and the different…

  13. Teaching Students to Analyze Agency Actions via a NEPA Analysis Approach

    ERIC Educational Resources Information Center

    Whitworth, Paul M.

    2008-01-01

    Future recreation professionals need the ability to analyze the effects of proposed management actions and stakeholder concerns to make good decisions, maintain public support, and comply with state and federal laws. Importantly, when federal funds, lands, permits or licenses are involved, federal law requires consideration of environmental and…

  14. 77 FR 52108 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... Hills Parkway in the city of St. George, Washington County, Utah. The project will include widening of... proposed highway project, State Route 18 (Bluff Street); from St. George Boulevard to Red Hills Parkway, in Washington County in the State of Utah. Those actions grant licenses, permits, and approvals for the...

  15. 78 FR 17748 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... MP 16 project in Washington County in the State of Utah. These actions grant approvals for the... and MP 16 in Washington County, Utah. The project consists of the following improvements: Constructing..., between Brigham Road and Dixie Drive, and between Washington Parkway and SR-9; removing the...

  16. 75 FR 62182 - Notice of Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... Cumberland, Sampson, and Duplin Counties, North Carolina (T.I.P Project R-2303). Those actions grant licenses... Bern Avenue, Ste 410, Raleigh, North Carolina, 27601-1418; Telephone: (919) 747-7014; e-mail: clarence.coleman@dot.gov . FHWA North Carolina Division Office's normal business hours are 8 a.m. to 5...

  17. 77 FR 17565 - Notice of Final Federal Agency Actions on Proposed Transportation Improvements in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... West Project) in Draper, Salt Lake County in the State of Utah. These actions grant licenses, permits... in the State of Utah: The Bangerter 600 West Project in Draper, Salt Lake County, Utah, project... Railroad (UPRR) line at about 900 West in the city of Draper in Salt Lake County. The Selected...

  18. 77 FR 17564 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... Lake County in the State of Utah). These actions grant licenses, permits, and approvals for the project... of Utah: Cottonwood Street; 4500 South to Vine Street in Murray City, Salt Lake County, project..., Environmental Program Manager, Federal Highway Administration, 2520 West 4700 South, Suite 9A, Salt Lake...

  19. 77 FR 66500 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... the City of Riverside, in the counties of Orange and Riverside, State of California. Those actions... to Pierce Street in the City of Riverside. The existing express lanes in Orange County will be extended east from the Orange/County line to Interstate 15 (I-15) in the City of Corona. The existing...

  20. 75 FR 70349 - Notice of Final Federal Agency Actions on Proposed Highways in Alaska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... Highway from Lucus Road to Big Lake Road, in the Matanuska-Susitna Borough, State of Alaska. Those actions... improvements between Lucus Road and Big Lake Road, a distance of approximately eight miles. The five-lane section east of the project would be extended one mile west from Lucus Road to Church Road and...

  1. A Flexible Friend: Action Learning in the Context of a Multi-Agency Organisation Development Programme

    ERIC Educational Resources Information Center

    Edmonstone, John; Flanagan, Hugh

    2007-01-01

    The current profile of action learning in the UK has recently become clearer (Pedler et al., 2005). Using the template of what have been described as "Revans's Classical Principles", fundamental divergences have begun to emerge. Pedler et al. (2005) identified a number of variances from this template--specifically the use of permanent facilitators…

  2. 77 FR 5617 - Notice of Final Federal Agency Action on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... through Friday, 7:30 a.m. to 4:30 p.m. MST. SUPPLEMENTARY INFORMATION: Notice is hereby given that the... Protection Act . 8. Executive Orders: E.O. 11990, Protection of Wetlands; E.O. 11988, Floodplain Management; E.O. 12898, Federal Actions to address Environmental Justice in Minority Populations and Low...

  3. 76 FR 41554 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ...: 619-688-0224, e-mail: david.nagy@dot.ca.gov . SUPPLEMENTARY INFORMATION: Effective July 1, 2007, the..., Federal Highway Administration, Sacramento, California. BILLING CODE 4910-RY-P ... Caltrans, that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a...

  4. 77 FR 58906 - Notice of Final Federal Agency Actions on Proposed Highway in Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ...)(1). The actions relate to a proposed highway project on I-90 over the Mississippi River. The... River with a new bridge that meets structural and geometric standards as well as reconstruction of the I...: I-90 Bridge over the Mississippi River and I-90/U.S. 14/U.S. 61 approach roadway interchange....

  5. 76 FR 2948 - Notice of Final Federal Agency Actions on Proposed Highway in Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... Wing County) to the County Road 2/42 intersection in Pine River (Cass County), Minnesota. Those actions... County Road 2/42 intersection in Pine River. The project is located in Crow Wing and Cass Counties. A Record of Decision (ROD) for the TH 371 corridor from Nisswa to Pine River was signed by FHWA in 2005....

  6. 76 FR 43372 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... April 17, 2007 (at 72 FR 19228-02). A claim seeking judicial review of the Tier 1 decisions must have... the Federal Register (at 73 FR 6241- 01) for the Section 1, 13.1 mile segment of I-69 in the Counties... Review of Actions by FHWA, United States Fish and Wildlife Service (USFWS), DOI, and United States...

  7. An Evaluation of the McDowell County Community Action Agency Home Economics Program.

    ERIC Educational Resources Information Center

    Williams, Jeanne

    The document reports on the activities of the home economics component of the community action program of McDowell County as falling within socialization and training emphasis and consisting of services to promote an eventual attainment of independence. The stated basis is assistance in the integration of the members of the target population into…

  8. 76 FR 65776 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ...). The actions relate to a proposed highway project, US 41 (Memorial Drive to County M) in Brown County... Department of Transportation, US 41 Brown County Project Office, 1940 West Mason Street, Green Bay, Wisconsin... approvals for the following highway project: US 41 (Memorial Drive to County M), Brown County,...

  9. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... actions relate to a proposed highway and transit project within the Tier 1 Elgin O'Hare--West Bypass study... Elgin O'Hare Expressway on the west and located in Cook and DuPage Counties in Illinois just northwest... within the Elgin O'Hare--West Bypass study area in Cook and DuPage Counties in Illinois. Decisions in...

  10. 77 FR 75254 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... actions relate to a proposed highway and transit project within the Tier 2 Elgin O'Hare--West Bypass project corridor, which is located along the Elgin-O'Hare Expressway/Thorndale ] Avenue between Chicago O'Hare International Airport (O'Hare) and Lake Street/US Route 20, and on a proposed alignment...

  11. 77 FR 48586 - Notice of Final Federal Agency Actions on United States Highway 77

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-14

    ... Corpus Christi, Texas to US 83 in Harlingen, Texas. Those actions grant licenses, permits, and approvals..., Room 826, Austin, Texas 78701; telephone: (512) 536-5960; email: gregory.punske@dot.gov . The FHWA Texas Division Office's normal business hours are 7:45 a.m. to 4:15 p.m. (central time) Monday...

  12. 75 FR 54420 - Notice of Final Federal Agency Actions on US 290/Hempstead Corridor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    ... Protection Policy Act (FPPA) [7 U.S.C. 4201-4209]. 7. Wetlands and Water Resources: Clean Water Act [33 U.S.C. 1251- 1342]; Land and Water Conservation Fund (LWCF) . 8. Executive Orders: E.O. 11990 Protection of...) in Harris County, Texas. Those actions grant licenses, permits, and approvals for the...

  13. 76 FR 1664 - Notice of Final Federal Agency Actions on State Highway 99 (Segment G)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... and Water Resources: Clean Water Act [33 U.S.C. 1251- 1342]; Land and Water Conservation Fund (LWCF... 45 (I-45) to US 59 in Harris and Montgomery Counties, Texas. Those actions grant licenses, permits... Street, Room 826 Austin, Texas 78701; telephone: (512) 536-5960; e- mail: gregory.punske@dot.gov ....

  14. Social Justice in Practice? Exploring Teacher Candidates' Commitment toward Change Agency through Action Research

    ERIC Educational Resources Information Center

    Burrell Storms, Stephanie

    2015-01-01

    Scholars have criticized teacher education programs for using action research (AR) to improve candidates' technical skills rather than promote its emancipatory goals. The author argues candidates who conduct critical AR promote its emancipatory goals and indicate a commitment to act as change agents for social justice through education. This…

  15. 77 FR 6171 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... segments. The existing two-lane, two-span, steel stringer/multi-beam bridge would be replaced with a two....C. 139(l)(1). The actions relate to a proposed local assistance bridge replacement project on Main... Creek Bridge Replacement Project on Main Street (former State Route 49) in Amador City, Amador...

  16. Bonneville Power Administration`s Commercial Sector Conservation Market.

    SciTech Connect

    Gordan, Frederick M.

    1992-11-10

    Bonneville has, as part of its resource plan, accepted targets for commercial conservation which are quite ambitious. To meet these targets, Bonneville will need to acquire as much cost-effective conservation as possible over the next twelve years. With this in mind, this document explores the relative importance of different commercial market segments and the types of assistance each market needs to install as many cost-effective conservation measures in as many buildings as possible. This document reviews Bonneville`s marketing environment and position, and suggests goals for commercial sector conservation marketing at Bonneville. Then it presents a broad market segmentation and series of additional demographic analyses. These analyses assess what groups of consumers Bonneville must reach to achieve most of the commercial conservation potential and what is needed to reach them. A final section reviews the success of Bonneville programs at reaching various markets. The market segmentation identifies different types of consumers and opportunities which would require distinct program approaches. Four large market segments are identified that have distinct program needs. Then four ``building life-cycle events`` are identified which provide important conservation opportunities and also require distinct program services. This creates a matrix of 16 cells which delineate distinct needs for program marketing. Each of the four key market segments manages at least 20% of the Region`s commercial floorspace.

  17. Water resources. Bureau of Reclamation's Bonneville Unit: future repayment arrangements

    SciTech Connect

    Not Available

    1986-03-01

    GAO is convinced that: the Bureau of Reclamation's use of the Water Supply Act of 1958 to defer a portion of municipal and industrial (M and I) costs of the Bonneville Unit was illegal, the Bureau's use of ad valorem (percentage of value) tax revenues from property owners to increase the Bonneville Unit's M and I customers repayment obligation under the 1965 contract was improper, and the Department of Energy Organization Act 1977 requires congressional approval of the modified cost allocation of the Bonneville Unit initiated by the Bureau in 1984.

  18. Hazardous waste management system--Environmental Protection Agency. Notice of regulatory reform actions; request for comments.

    PubMed

    1982-12-13

    In response to Executive Order 12291 and the President's Task Force on Regulatory Relief, the Environmental Protection Agency is reviewing and reassessing the hazardous waste regulations developed under the Resource Conservation and Recovery Act (RCRA). A variety of activities are underway that will simplify procedures and reduce paperwork, modify existing regulations to make them more workable and cost effective, and control new wastes and new processes. The purpose of this notice is to inform the public of these activities and invite comments on the general approaches being taken. PMID:10259796

  19. 75 FR 19670 - Notice of Final Federal Agency Actions on a Proposed New Road Connecting I-65 and U.S. 31W in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... Federal Highway Administration Notice of Final Federal Agency Actions on a Proposed New Road Connecting I... meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project: a new connector road... following highway project in the State of Kentucky: The project involves the construction of a new...

  20. Using Ensemble Streamflows for Power Marketing at Bonneville Power Administration

    NASA Astrophysics Data System (ADS)

    Barton, S. B.; Koski, P.

    2014-12-01

    Bonneville Power Administration (BPA) is a federal non-profit agency within the Pacific Northwest responsible for marketing the power generated from 31 federal hydro projects throughout the Columbia River Basin. The basin encompasses parts of five states and portions of British Columbia, Canada. BPA works with provincial entities, federal and state agencies, and tribal members to manage the water resources for a variety of purposes including flood risk management, power generation, fisheries, irrigation, recreation, and navigation. This basin is subject to significant hydrologic variability in terms of seasonal volume and runoff shape from year to year which presents new water management challenges each year. The power generation planning group at BPA includes a team of meteorologists and hydrologists responsible for preparing both short-term (up to three weeks) and mid-term (up to 18 months) weather and streamflow forecasts including ensemble streamflow data. Analysts within the mid-term planning group are responsible for running several different hydrologic models used for planning studies. These models rely on these streamflow ensembles as a primary input. The planning studies are run bi-weekly to help determine the amount of energy available, or energy inventory, for forward marketing (selling or purchasing energy up to a year in advance). These studies are run with the objective of meeting the numerous multi-purpose objectives of the basin under the various streamflow conditions within the ensemble set. In addition to ensemble streamflows, an ensemble of seasonal volume forecasts is also provided for the various water conditions in order to set numerous constraints on the system. After meeting all the various requirements of the system, a probabilistic energy inventory is calculated and used for marketing purposes.

  1. 77 FR 21764 - United States Department of Energy and Bonneville Power Administration; Notice of Petition for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... Energy Regulatory Commission United States Department of Energy and Bonneville Power Administration... CFR 35.28(e) and 18 CFR 385.207, the Bonneville Power Administration (Bonneville), submitted certain... the Commission find that Bonneville's tariff, as amended by this filing, substantially conforms or...

  2. 78 FR 22540 - Department of Energy, Bonneville Power Administration; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ... Energy Regulatory Commission Department of Energy, Bonneville Power Administration; Notice of Petition...(e) and 18 CFR 385.207, the Bonneville Power Administration (Bonneville), submitted certain... the Commission find that Bonneville's tariff, as amended by this filing, substantially conforms or...

  3. 78 FR 39279 - United States Department of Energy; Bonneville Power Administration; Notice of Petition for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ... Energy Regulatory Commission United States Department of Energy; Bonneville Power Administration; Notice..., 18 CFR 35.28(e) and 18 CFR 385.207, the Bonneville Power Administration (Bonneville), submitted... requesting the Commission find that Bonneville's OATT, as amended by this filing, substantially conform or...

  4. Impact of the International Atomic Energy Agency (IAEA) actions on radiation protection of patients in many countries.

    PubMed

    Rehani, Madan M; Tsapaki, Virginia

    2011-09-01

    In the 1990s, there was a lack of information on patient doses in most developing countries. In 2004, the International Atomic Energy Agency initiated projects aimed at assessing 'how safe are patients in radiological procedures and how to make them safer'. The major obstacle was a lack of medical physicists with patient dosimetry skills and a lack of dosimetry facilities. Actions taken were such as to yield results within a short span of time and a number of publications with interesting findings. Results showed that while patient doses in radiography are largely within diagnostic reference levels (DRLs), poor image quality is rampant. In mammography, CT and interventional procedures, doses higher than DRLs were observed. Dose management actions were implemented and significant improvements emerged. Utilising existing manpower (physicists, regulators, radiographers, radiologists), preparing detailed guidelines and data collection forms, focussing training on acquiring dosimetry skills, a system of periodic reports with mentoring and motivating collaborations within each country are some of the reasons for the success of the project. PMID:21725082

  5. The Promise of Using Energy Tracking Data to Promote Home-School Connections and Youth Agency in Climate Action

    NASA Astrophysics Data System (ADS)

    Walsh, E.; Jenkins, D.; Cordero, E.

    2015-12-01

    Formal classroom learning experiences that support energy conservation behaviors outside the classroom necessarily must bridge students' home and school lives, as knowledge and practice learned in the classroom is implemented outside of school. To this end, we study the impact of the Green Ninja Energy Tracker curriculum, which uses students' home energy data in the classroom to promote engagement in climate change and conservation behaviors. Data is drawn from class observations, a focus group, and pre- and post- surveys of a pilot implementation of this curriculum in a diverse 12th-grade Earth Science classroom at an alternative school. We investigate what factors contributed to student engagement in learning about and participating in energy conservation behaviors. We found that students were engaged by the immediacy of tracking their energy use in near-real time, and were motivated by the economic benefits experienced as a direct result of changing their behaviors. In addition, students reported discussing and problem-solving energy use with their families, and surfaced considerations that informed which energy behaviors were implemented and why. Students also reported high levels of personal agency in taking action on climate change, but were pessimistic about the likelihood of society as a whole taking action. We suggest that this pilot demonstrates that potential power of connecting students' home and school lives through energy tracker software as a catalyst for developing scientific expertise and engagement, and supporting energy conservation behaviors.

  6. A multi-agency investigation of Heat and human Health relationships in the state of Vermont: Towards actionable science.

    NASA Astrophysics Data System (ADS)

    Oswald, E.

    2015-12-01

    This talk focuses on an assemblage of work conducted primarily between the Vermont State Climate Office and the Vermont Department of Health for better understanding, communicating, and anticipating the impact which elevated air temperatures have, and my have in the future, on public health. This is an example in how several agencies, spanning scientific fields and levels, can all play roles in in producing important understanding and actionable consequences in the face of health risk. This talk starts with an investigation of the relationships between Vermont health statistics and daily maximum air temperature with a focus on the temperatures where the health statistics changed most rapidly with temperature changes, or "changepoints". The results of this investigation suggested that meaningful temperature changepoints exist below 90F. The local WFO considered a day as "hot" when it reached or exceeded 90F unless the day was particularly sunny and humid. Discussions with the local National Weather Service Forecast Office were productive and led to some rethinking of how they consider a "Hot" day. The changepoints information was also incorporated into a health impacts report prepared by the Vermont Department of Health for the CDC's Building Resilience Against Climate Effects, by utilizing climate indices tailored to a temperature less than 90F. This work stands as a demonstration that the co-production of knowledge can produce actionable science.

  7. Bonneville Unit Clean Hydropower Facilitation Act

    THOMAS, 113th Congress

    Sen. Hatch, Orrin G. [R-UT

    2013-01-22

    06/20/2013 Held at the desk. (All Actions) Notes: For further action, see H.R.254, which became Public Law 113-20 on 7/18/2013. Tracker: This bill has the status Passed SenateHere are the steps for Status of Legislation:

  8. Quantitative identification of erosional Lake Bonneville shorelines, Utah

    NASA Astrophysics Data System (ADS)

    Jewell, Paul W.

    2016-01-01

    Although the major shorelines of Pleistocene Lake Bonneville have been recognized for more than 100 years, less prominent shorelines have proven difficult to quantitatively identify and correlate since the time of G. K. Gilbert. By applying the Savitzky-Golay filter and methodology of Hare et al. to high resolution LiDAR data of selected erosional shorelines, five distinct, correlatable shorelines between the well-described Bonneville and Provo shorelines on the transgressive limb of the Lake Bonneville hydrograph are documented. The results provide a framework for determining whether these transgressive features represent lake oscillations or stillstands during the height of the Last Glacial Maximum in the eastern Great Basin of the western United States with possible attendant paleoclimate implications.

  9. New explorations along the northern shores of Lake Bonneville

    USGS Publications Warehouse

    Oviatt, Charles G.; Miller, D.M.

    1997-01-01

    This field trip begins in Salt Lake City and makes a clockwise circuit of Great Salt Lake, with primary objectives to observe stratigraphie and geomorphic records of Lake Bonneville. Stops include Stansbury Island, Puddle Valley, gravel pits at Lakeside and the south end of the Hogup Mountains, several stops in Curlew Valley and Hansel Valley, and a final stop at the north end of Great Salt Lake east of the Promontory Mountains. Stratigraphie observations at gravel-pit and natural exposures will be linked to interpretations of lake-level change, which were caused by climate change. Evidence of paleoseismic and volcanic activity will be discussed at several sites, and will be tied to the lacustrine stratigraphic record. The trip provides an overview of the history of Lake Bonneville and introduces participants to some new localities with excellent examples of Lake Bonneville landforms and stratigraphy.

  10. Lake-atmosphere feedbacks associated with paleolakes Bonneville and Lahontan

    USGS Publications Warehouse

    Hostetler, S.W.; Giorgi, F.; Bates, G.T.; Bartlein, P.J.

    1994-01-01

    A high-resolution, regional climate model nested within a general circulation model was used to study the interactions between the atmosphere and the large Pleistocene lakes in the Great Basin of the United States. Simulations for January and July 18,000 years ago indicate that moisture provided by synoptic-scale atmospheric circulation features was the primary component of the hydrologic budgets of Lakes Lahontan and Bonneville. In addition, lake-generated precipitation was a substantial component of the hydrologic budget of Lake Bonneville at that time. This local lake-atmosphere interaction may help explain differences in the relative sizes of these lakes 18,000 years ago.

  11. Evaluation of Bonneville`s 1988 and 1989 Residential Weatherization Program: A Northwest study of program dynamics

    SciTech Connect

    Brown, M.A.; White, D.L.

    1992-12-01

    This study continues the series of evaluations of the Bonneville Power Administration`s long-term Residential Weatherization Program (RWP) by examining the energy saved by its 1988 and 1989 participants. The sample of participants for this study was drawn from 10 utilities covering the region`s three climate zones. Six of these utilities were included in the 1988 RWP evaluation, and eight of them were included in the 1989 RWP evaluation. This study analyzes data on 356 participating households in 1988, 433 participants in 1989, and a comparison group of 1170 nonparticipants in 1988 and 1466 in 1989. Previous evaluations of Bonneville`s earlier weatherization programs provide an historic context for analyzing program dynamics.

  12. 32 CFR 552.170 - Camp Bonneville Area Access Office.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Camp Bonneville Area Access Office. 552.170 Section 552.170 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Land Use Policy for Fort...

  13. 32 CFR 552.170 - Camp Bonneville Area Access Office.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 3 2011-07-01 2009-07-01 true Camp Bonneville Area Access Office. 552.170 Section 552.170 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Land Use Policy for Fort...

  14. 32 CFR 552.170 - Camp Bonneville Area Access Office.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 3 2014-07-01 2014-07-01 false Camp Bonneville Area Access Office. 552.170 Section 552.170 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Land Use Policy for Fort...

  15. 32 CFR 552.170 - Camp Bonneville Area Access Office.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 3 2013-07-01 2013-07-01 false Camp Bonneville Area Access Office. 552.170 Section 552.170 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Land Use Policy for Fort...

  16. 32 CFR 552.170 - Camp Bonneville Area Access Office.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 3 2012-07-01 2009-07-01 true Camp Bonneville Area Access Office. 552.170 Section 552.170 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Land Use Policy for Fort...

  17. Evaluation of Salmon Spawning Below Bonneville Dam, Annual Report October 2005 - September 2006.

    SciTech Connect

    Arntzen, Evan V.; Mueller, Robert P.; Murray, Christopher J.

    2007-09-21

    Since FY 2000, scientists at Pacific Northwest National Laboratory (PNNL) have conducted research to assess the extent of spawning by chum salmon (Oncorhynchus keta) and fall Chinook salmon (O. tshawytscha) in the lower mainstem Columbia River. Their work supports a larger project funded by the Bonneville Power Administration (BPA) aimed at characterizing the physical habitat used by mainstem fall Chinook and chum salmon populations. Multiple collaborators in addition to PNNL are involved in the BPA project--counterparts include the Washington Department of Fish and Wildlife (WDFW), U.S. Fish and Wildlife Service (USFWS), Pacific States Marine Fisheries Commission (PSMFC), U.S. Geological Survey (USGS), and Oregon Department of Fish and Wildlife (ODFW). Data resulting from the individual tasks each agency conducts are providing a sound scientific basis for developing strategies to operate the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance the chum and tule fall Chinook salmon populations--both listed as threatened under the Endangered Species Act (ESA). Fall Chinook salmon, thought to originate from Bonneville Hatchery, were first noted to be spawning downstream of Bonneville Dam by WDFW biologists in 1993. Known spawning areas include gravel beds on the Washington side of the river near Hamilton Creek and near Ives Island. Limited surveys of spawning ground were conducted in the area around Ives and Pierce islands from 1994 through 1997. Based on those surveys, it is believed that fall Chinook salmon are spawning successfully in this area. The size of this population from 1994 to 1996 was estimated at 1800 to 5200 fish. Chum salmon also have been documented spawning downstream of Bonneville Dam. Chum salmon were listed as threatened under the ESA in March 1999. At present there is a need to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning

  18. Evaluation of Salmon Spawning Below Bonneville Dam, 2005-2006 Annual Report.

    SciTech Connect

    Arntzen, Evan; Mueller, Robert; Murray, Christopher

    2007-03-01

    Since FY 2000, scientists at Pacific Northwest National Laboratory (PNNL) have conducted research to assess the extent of spawning by chum salmon (Oncorhynchus keta) and fall Chinook salmon (O. tshawytscha) in the lower mainstem Columbia River. Their work supports a larger project funded by the Bonneville Power Administration (BPA) aimed at characterizing the physical habitat used by mainstem fall Chinook and chum salmon populations. Multiple collaborators in addition to PNNL are involved in the BPA project--counterparts include the Washington Department of Fish and Wildlife (WDFW), U.S. Fish and Wildlife Service (USFWS), Pacific States Marine Fisheries Commission (PSMFC), U.S. Geological Survey (USGS), and Oregon Department of Fish and Wildlife (ODFW). Data resulting from the individual tasks each agency conducts are providing a sound scientific basis for developing strategies to operate the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance the chum and tule fall Chinook salmon populations--both listed as threatened under the Endangered Species Act (ESA). Fall Chinook salmon, thought to originate from Bonneville Hatchery, were first noted to be spawning downstream of Bonneville Dam by WDFW biologists in 1993. Known spawning areas include gravel beds on the Washington side of the river near Hamilton Creek and near Ives Island. Limited surveys of spawning ground were conducted in the area around Ives and Pierce islands from 1994 through 1997. Based on those surveys, it is believed that fall Chinook salmon are spawning successfully in this area. The size of this population from 1994 to 1996 was estimated at 1800 to 5200 fish. Chum salmon also have been documented spawning downstream of Bonneville Dam. Chum salmon were listed as threatened under the ESA in March 1999. At present there is a need to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning

  19. 41 CFR 102-74.505 - What action must Federal agencies take after disapproving an application or canceling an issued...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... agencies take after disapproving an application or canceling an issued permit? 102-74.505 Section 102-74... after disapproving an application or canceling an issued permit? Upon disapproving an application or canceling a permit, Federal agencies must promptly— (a) Notify the applicant or permittee of the reasons...

  20. 41 CFR 102-74.505 - What action must Federal agencies take after disapproving an application or canceling an issued...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... agencies take after disapproving an application or canceling an issued permit? 102-74.505 Section 102-74... after disapproving an application or canceling an issued permit? Upon disapproving an application or canceling a permit, Federal agencies must promptly— (a) Notify the applicant or permittee of the reasons...

  1. Reinterpretation of the Burmester core, Bonneville basin, Utah

    USGS Publications Warehouse

    Oviatt, Charles G.; Thompson, R.S.; Kaufman, D.S.; Bright, Jordon; Forester, R.M.

    1999-01-01

    Initial interpretation of the sediments from the Burmester core (Eardley et al. (1973). Geological Society of America Bulletin 84, 211-216) indicated that 17 deep-lake cycles, separated by shallow-lake and soil-forming intervals, occurred in the Bonneville basin during the Brunhes Chron (the last 780 x 103 yr). Our re-examination of the core, along with new sedimentological, geochronological, and paleontological data, indicate that only four deep-lake cycles occurred during this period, apparently correlative with marine oxygen-isotope stages 2, 6, 12, and 16. This interpretation suggests that large lakes formed in the Bonneville basin only during the most extensive of the Northern Hemisphere glaciations.

  2. Evaluation of Salmon Spawning Below Bonneville Dam Annual Report October 2006 - September 2007.

    SciTech Connect

    Arntzen, Evan V.; Mueller, Robert P.; Murray, Katherine J.; Bott, Yi-Ju

    2008-08-08

    From 1999 through 2007, the Fish and Wildlife Program of the Bonneville Power Administration funded a project to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Data were collected to ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. The projects objectives are consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Because of the influence of mainstem habitat on salmon production, there is a continued need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. During FY 2007, Pacific Northwest National Laboratory focused on (1) locating and mapping deep-water fall Chinook salmon and chum salmon spawning areas, (2) investigating the interaction between groundwater and surface water near fall Chinook and chum salmon spawning areas, and (3) providing in-season hyporheic temperature and water surface elevation data to assist state agencies with emergence timing and redd dewatering estimates. This report documents the studies and tasks performed by PNNL during FY 2007. Chapter 1 provides a description of the searches conducted for deepwater redds-adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the

  3. Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2002

    SciTech Connect

    Ploskey, Gene R. ); Schilt, Carl R.; Kim, J; Escher, Charles; Skalski, John R.

    2003-08-15

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) and the U.S. Army Engineer Research and Development Center (ERDC) conduct fish-passage studies at Bonneville Dam in 2002. The ERDC contracted with MEVATEC Corporation to provide staff ranging from scientists to technicians to help conduct the study. This study supports the Portland-District goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. In this report, we present results of two studies of juvenile salmonid passage at Bonneville Dam that we carried out in the 2002 downstream passage season April 20 through July 15, 2002. The first study of Project-wide FPE provides hourly estimates of fish passage and associated variances for all operating turbine units, spill bays, and the two sluiceway entrances at Powerhouse 1 (B1), as well as estimates of a variety of fish-passage efficiency and effectiveness measures. This was the third consecutive year of full-project hydroacoustic sampling and passage estimation. The second study was more narrowly focused on B2 turbines and had two components: (1) to sample the FGE at two modified turbine intakes and compare them with efficiencies of other B2 units that were sampled in the first study, and (2) to evaluate proportions of fish passing up into gatewell slots versus through screen gaps at a few B2 turbine intakes.

  4. Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

    2005-12-22

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

  5. 78 FR 32530 - Notice of Final Federal Agency Action on Proposed Highway in Georgia the Northwest I-75/I-575...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... Northwest I-75/I-575 Corridor, Cobb and Cherokee Counties, Georgia (Atlanta Metropolitan Area) AGENCY... I-75 to Sixes Road on I-575) located in Cobb and Cherokee Counties, Georgia. The approximate...

  6. 78 FR 64592 - Notice of Final Federal Agency Actions on the Stehekin Valley Road Improvement Project From the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... Improvement Project From the Stehekin River Corridor Implementation Plan: Chelan County, Washington AGENCY... Improvement project from the Stehekin River Corridor Implementation Plan in Chelan County, Washington. This... Decision, NPS Stehekin River Corridor Implementation Plan Environmental Impact Statement (EIS) and...

  7. 77 FR 66215 - Limitation of Claims Notice for Judicial Review of Actions by FHWA and Other Federal Agencies in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... Other Federal Agencies in the City of Cincinnati, Hamilton County, OH and the City of Covington, Kenton... Interstate Routes 71 and 75 and interchanges in the City of Cincinnati, Hamilton County, State of Ohio...

  8. Lake Bonneville - Constraints on lithospheric thickness and upper mantle viscosity from isostatic warping of Bonneville, Provo, and Gilbert stage shorelines

    NASA Technical Reports Server (NTRS)

    Bills, Bruce G.; May, Glenn M.

    1987-01-01

    Data collected from three deformed shorelines of Lake Bonneville (the Bonneville, Provo, and Gilbert shorelines) are used to constrain the effective elastic lithospheric thickness to 23 + or - 2 km, the mantle viscosity to (1.2 + or - 0.2) x 10 to the 20th Pa sec, and the depth to a significant viscosity increase to no less than 300 km. A modification of the earth model of Nakiboglu and Lambeck (1982, 1983) is used for the calculations, and the water load is computed at each time step from a digital terrain model and a specified lake elevation. Differences noted between the observed and computed shoreline elevations indicate a regional tilt down to the NE of about 6 x 10 to the -5th, which is suggested to be due to collapse of the peripheral bulge formed by the Laurentide ice sheet.

  9. 78 FR 54947 - Notice of Final Federal Agency Actions on Proposed US 1 Improvements-Rockingham, Richmond County, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... County, NC ] from Sandhill Road (SR 1971) to Marston Road (SR 1001). Those actions grant licenses... proposed action will improve 19 miles of US 1 from Sandhill Road (SR 1971) south of Rockingham to Marston... on new location, and widens about five miles of existing US 1. From Sandhill Road (SR 1971) to...

  10. 25 CFR 23.61 - Appeals from decision or action by Agency Superintendent, Area Director or Grants Officer.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... THE INTERIOR HUMAN SERVICES INDIAN CHILD WELFARE ACT Appeals § 23.61 Appeals from decision or action... consider the appeal in accordance with 25 CFR 2.20 (c) through (e). Appeal procedures shall be as set...

  11. 25 CFR 23.61 - Appeals from decision or action by Agency Superintendent, Area Director or Grants Officer.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... THE INTERIOR HUMAN SERVICES INDIAN CHILD WELFARE ACT Appeals § 23.61 Appeals from decision or action... consider the appeal in accordance with 25 CFR 2.20 (c) through (e). Appeal procedures shall be as set...

  12. 25 CFR 23.61 - Appeals from decision or action by Agency Superintendent, Area Director or Grants Officer.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... THE INTERIOR HUMAN SERVICES INDIAN CHILD WELFARE ACT Appeals § 23.61 Appeals from decision or action... consider the appeal in accordance with 25 CFR 2.20 (c) through (e). Appeal procedures shall be as set...

  13. 25 CFR 23.61 - Appeals from decision or action by Agency Superintendent, Area Director or Grants Officer.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... THE INTERIOR HUMAN SERVICES INDIAN CHILD WELFARE ACT Appeals § 23.61 Appeals from decision or action... consider the appeal in accordance with 25 CFR 2.20 (c) through (e). Appeal procedures shall be as set...

  14. 75 FR 36151 - Notice of Final Federal Agency Actions on Proposed Highway in California; Notice of Statute of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... the laws under which such actions were taken, are described in the Final Environmental Assessment (FEA..., 2010, and in other documents in the FHWA project records. The FEA, FONSI, and other project records...

  15. 25 CFR 23.61 - Appeals from decision or action by Agency Superintendent, Area Director or Grants Officer.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... THE INTERIOR HUMAN SERVICES INDIAN CHILD WELFARE ACT Appeals § 23.61 Appeals from decision or action... consider the appeal in accordance with 25 CFR 2.20 (c) through (e). Appeal procedures shall be as set...

  16. 78 FR 24794 - Notice of Final Federal Agency Actions on the Proposed Presque Isle Bypass in Aroostook County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... Isle Bypass FEIS located in the Town of Presque Isle, Aroostook County, Maine. Those actions grant... Governments. (Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and...

  17. 76 FR 56493 - Notice of Final Federal Agency Actions on State Loop 375 From Interstate Highway 10 to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... Interstate Highway 10 to the Franklin Mountains State Park in Texas AGENCY: Federal Highway Administration... Franklin Mountains State Park Entrance (Loop 375 Transmountain West Project), in El Paso County in the...) to 0.479 Mile East of the Tom Mays Unit of the Franklin Mountains State Park Entrance (Loop...

  18. Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2005

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Zimmerman, Shon A.; Hughes, James S.; Bouchard, Kyle E.; Fischer, Eric S.; Schilt, Carl R.; Hanks, Michael E.; Kim, Jina; Skalski, John R.; Hedgepeth, J.; Nagy, William T.

    2006-12-04

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2005. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of two studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 16 and July 15, 2005, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, and (2) smolt approach and fate at B1 Sluiceway Outlet 3C from the B1 forebay. Some of the large appendices are only presented on the compact disk (CD) that accompanies the final report. Examples include six large comma-separated-variable (.CSV) files of hourly fish passage, hourly variances, and Project operations for spring and summer from Appendix E, and large Audio Video Interleave (AVI) files with DIDSON-movie clips of the area upstream of B1 Sluiceway Outlet 3C (Appendix H). Those video clips show smolts approaching the outlet, predators feeding on smolts, and vortices that sometimes entrained approaching smolts into turbines. The CD also includes Adobe Acrobat Portable Document Files (PDF) of the entire report and appendices.

  19. 1992-1993 Bonneville Appliance Efficiency Program: Showerhead Evaluation Volume II - Appendices

    SciTech Connect

    Warwick, W.M.

    1995-01-01

    This report included the appendices for 1992-1993 Bonneville appliance efficiency program: showerhead evaluation. It consists of nine appendices, titled: Bonneville documents; overview of research projects; Puget Power and Light persistence study; hot-water flow analyses and assumptions documentation; regional end-use metering program; showerhead and faucet aerator performance assessment; Bonneville showerhead program distribution methods by participating utility; water- and energy-saving measure distribution methods literature review; REMP study load shape results.

  20. Great Salt Lake and Bonneville Salt Flats, UT, USA

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This is a view of the Great Salt Lake and nearby Bonneville Salt Flats, UT, (41.0N, 112.5W). A railroad causeway divides the lake with a stark straight line changing the water level and chemistry of the lake as a result. Fresh water runoff enters from the south adding to the depth and reducing the salinity. The north half receives little frsh water and is more saline and shallow. The Bonnieville Salt Flats is the lakebed of a onetime larger lake.

  1. 75 FR 32835 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Actions on Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    ...). The actions relate to a proposed highway project, the Interstate 10 High Occupancy Toll Lanes project... Occupancy Vehicle Lane into a High Occupancy Toll (HOT) Lane on I-10 San Bernardino Freeway/El Monte Busway. Work involves installation of signage and toll infrastructure, restriping of the existing lanes...

  2. 77 FR 52708 - Agency Information Collection Activities: Proposed Collection; Comment Request; Generic Clearance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... (75 FR 80542). Below we provide the BPA projected average estimates for the next three years: \\1\\ \\1...: Bonneville Power Administration (BPA), DOE. ACTION: 30-Day notice of submission of information...

  3. Late Quaternary environmental change in the Bonneville basin, western USA

    USGS Publications Warehouse

    Madsen, D.B.; Rhode, D.; Grayson, D.K.; Broughton, J.M.; Livingston, S.D.; Hunt, J.; Quade, Jay; Schmitt, D.N.; Shaver, M. W., III

    2001-01-01

    Excavation and analyses of small animal remains from stratified raptor deposits spanning the last 11.5 ka, together with collection and analysis of over 60 dated fossil woodrat midden samples spanning the last 50 ka, provide a detailed record of changing climate in the eastern Great Basin during the late Pleistocene and Holocene. Sagebrush steppe dominated the northern Bonneville basin during the Full Glacial, suggesting that conditions were cold and relatively dry, in contrast to the southern basin, which was also cold but moister. Limber pine woodlands dominated ???13-11.5 ka, indicating increased dryness and summer temperatures ???6-7??C cooler than present. This drying trend accelerated after ???11.5 ka causing Lake Bonneville to drop rapidly, eliminating 11 species of fish from the lake. From ???11.5-8.2 ka xerophytic sagebrush and shadscale scrub replaced more mesophilic shrubs in a step-wise fashion. A variety of small mammals and plants indicate the early Holocene was ???3??C cooler and moister than at present, not warmer as suggested by a number of climatic models. The diversity of plants and animals changed dramatically after 8.2 ka as many species disappeared from the record. Some of the upland species returned after ???4 ka and Great Salt Lake became fresh enough at ???3.4 and ???1.2 ka to support populations of Utah chub. ?? 2001 Elsevier Science B.V.

  4. Final Environmental Assessment and Finding of No Significant Impact: White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam

    SciTech Connect

    N /A

    2003-04-23

    Bonneville Power Administration (BPA) is proposing to fund the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The project proposes to continue to carry out harvest monitoring and stock status updates coordinated with fisheries management planning, annual young-of-the year recruitment indexing, research, experimental artificial propagation, and transport of white sturgeon to less densely populated areas of the river(s). Additionally, release of hatchery-reared juveniles is proposed to evaluate release strategies. Actions will take place in the following Columbia River mainstem reaches: Bonneville, The Dalles, John Day, and McNary Reservoirs; Hanford Reach, as well as the Wanapum and Rock Island Reservoirs; and the following Snake River mainstem reaches: Ice Harbor, Lower Monumental and Little Goose Reservoirs. Spawning and rearing are undertaken at established hatcheries at McNary Dam and also the Abernathy Fish Technology Center. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1367, April 2003) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  5. Modeling lithospheric rheology from modern measurements of Bonneville shoreline deformation

    NASA Astrophysics Data System (ADS)

    Beard, Eric P.

    Here I develop a cross-correlation approach to estimating heights of shoreline features, and apply the new method to paleo-shorelines of Pleistocene Lake Bonneville. I calculaTe 1st-derivative (slope) and 2nd-derivative (curvature) profiles from Digital Elevation Model (DEM) or Global Positioning SysTem Real-Time Kinematic (GPS-RTK) measurements of elevation. I then cross-correla Te pairs of profiles that have been shifT ed by various "lags," or shifts in elevation. The correlation coefficient (a normalized dot-product measure of similarity) is calcula Ted as a function of lag within small (~40 m) windows cenTered at various elevations. The elevation and lag with the greaTest correlation coefficient indicaTes the shoreline elevation at the reference profile and the change in shoreline height for the profile pair. I evalua Te several different algorithms for deriving slope and curvature by examining closure of elevation lags across profile triples. I then model isostatic response to Lake Bonneville loading and unloading. I first model lakeshore uplift response to lake load removal assuming an elastic layer over an inviscid half-space. I obtain a best-fit comparison of predic Ted to observed shoreline heights for the Bonneville level with an elastic layer thickness, Te, of 25±2 km (at 95% confidence) when using only previously published shoreline elevation estimaTes. The best-fit for the Bonneville level when using these estimaTes plus 44 new estima Tes suggests a Te of 26±2 km. The best-fit model for the Provo level suggests Te of 17±3 km. For the Gilbert level, the response is insensitive to the assumed Te. I next model isostatic response to Bonneville loading and unloading

  6. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Review and Approval § 300.20 Interim acceptance and review of Bonneville Power Administration rates. (a) Opportunity to comment. The Commission will publish in the Federal Register notice of any filing made...

  7. The future of the Bonneville Power Administration: Aggressive competitor or bureaucratic dinosaur?

    SciTech Connect

    Hardy, R.W.

    1999-01-01

    Splitting the Bonneville Power Administration into fully separate generating and transmission entities is the only step, short of privatization or regionalization, that would eliminate the conflict between compliance with the Federal Energy Regulatory Commission`s open access requirements and the need to maximize Bonneville Power Administration revenues for taxpayers.

  8. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Review and Approval § 300.20 Interim acceptance and review of Bonneville Power Administration rates....

  9. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Review and Approval § 300.20 Interim acceptance and review of Bonneville Power Administration rates....

  10. 78 FR 15718 - United States Department of Energy, Bonneville Power Administration; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission United States Department of Energy, Bonneville Power Administration; Notice of Filing Take notice that on March 1, 2013, the Bonneville Power Administration filed a...

  11. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Review and Approval § 300.20 Interim acceptance and review of Bonneville Power Administration rates....

  12. Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory

    SciTech Connect

    Lee, A.D.; Conger, R.L.

    1996-06-01

    The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

  13. Above Bonneville Passage and Propagation Cost Effectiveness Analysis.

    SciTech Connect

    Paulsen, C.M.; Hyman, J.B.; Wernstedt, K.

    1993-05-01

    We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region.

  14. Eyeing the Drive Ahead After 'Bonneville' (3-D)

    NASA Technical Reports Server (NTRS)

    2004-01-01

    [figure removed for brevity, see original site] Figure 1

    [figure removed for brevity, see original site] Figure 2

    This stereo view was taken by the panoramic camera on NASA's Mars Exploration Rover Spirit on the rover's 87th martian day, or sol (April 1, 2004), just after Spirit left 'Bonneville Crater.' It shows the terrain to be covered in the trek towards the 'Columbia Hills' in the background. Barely visible to the right of the hills is the outline of the distant rim of Gusev Crater.

    This image is a stereo anaglyph in cylindrical-perspective projection. It combines images from the left and right eyes of the panoramic camera, taken through blue filters on both sides.

    Figure 1 is the left-eye view of a stereo pair and Figure 2 is the right-eye view of a stereo pair.

  15. Did Lake Bonneville Experience A Major Water-Budget Shift At 17.4 cal ka?

    NASA Astrophysics Data System (ADS)

    Oviatt, C.

    2009-12-01

    Lake Bonneville, in western Utah, had transgressed to its highest level by 18.3 cal ka, overflowed into the Snake River drainage basin until 17.4 cal ka, then catastrophically dropped 100 m as its overflow threshold was washed out. This event, which is referred to as the “Bonneville flood,” is well documented geomorphically, stratigraphically, and geochronologically. At the same time the Bonneville flood was occurring, the level of Lake Estancia in central New Mexico dropped over 30 m then returned to its previous high level in an event caused by climate change in that basin. The question is: “did Lake Bonneville experience a correlative climate-induced shift in its water budget (a decrease in the ratio of input to output), even while it continuously overflowed before, during, and after the Bonneville flood?” The answer to this question has a bearing on the global effects of the climate change that is well documented in the Estancia basin. Data from sediment cores from the Bonneville basin are providing a means to address the question. Data include: ostracode faunal changes, total inorganic carbon, stable isotopes, detrital sand, and mineralogy. The challenge is to identify the measurable characteristics of the sediment core that can be used to clearly separate the effects of water-budget change from those caused by the catastrophic (essentially instantaneous) 100-m lowering of Lake Bonneville.

  16. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA (Environmental Protection Agency) standards (40 CFR Part 192)

    SciTech Connect

    Not Available

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs.

  17. 76 FR 61707 - Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  18. Precise time dissemination and applications development on the Bonneville Power Administration system

    NASA Technical Reports Server (NTRS)

    Martin, Ken E.; Esztergalyos, J.

    1992-01-01

    The Bonneville Power Administration (BPA) uses IRIG-B transmitted over microwave as its primary system time dissemination. Problems with accuracy and reliability have led to ongoing research into better methods. BPA has also developed and deployed a unique fault locator which uses precise clocks synchronized by a pulse over microwaves. It automatically transmits the data to a central computer for analysis. A proposed system could combine fault location timing and time dissemination into a Global Position System (GPS) timing receiver and close the verification loop through a master station at the Dittmer Control Center. Such a system would have many advantages, including lower cost, higher reliability, and wider industry support. Test results indicate the GPS has sufficient accuracy and reliability for this and other current timing requirements including synchronous phase angle measurements. A phasor measurement system which provides phase angle has recently been tested with excellent results. Phase angle is a key parameter in power system control applications including dynamic braking, DC modulation, remedial action schemes, and system state estimation. Further research is required to determine the applications which can most effectively use real-time phase angle measurements and the best method to apply them.

  19. Demonstration Assessment of Light-Emitting Diode (LED) Retrofit Lamps at the Lobby of the Bonneville Power Administration, Portland, OR

    SciTech Connect

    Miller, Naomi

    2011-07-01

    This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in the lobby of the Bonneville Power Administration (BPA) headquarters building in Portland, Oregon. The project involved a simple retrofit of 32 track lights used to illuminate historical black-and-white photos and printed color posters from the 1930s and 1940s. BPA is a federal power marketing agency in the Northwestern United States, and selected this prominent location to demonstrate energy efficient light-emitting diode (LED) retrofit options that not only can reduce the electric bill for their customers but also provide attractive alternatives to conventional products, in this case accent lighting for BPA's historical artwork.

  20. A Rocky Rim Around 'Bonneville' in 3-D

    NASA Technical Reports Server (NTRS)

    2004-01-01

    [figure removed for brevity, see original site] Figure 1

    [figure removed for brevity, see original site] Figure 2

    This stereo view was taken by the panoramic camera on NASA's Mars Exploration Rover Spirit on the rover's 82nd martian day, or sol (March 27, 2004). At that point in its primary mission, Spirit was investigating a rock called 'Mazatzal' on the rim of 'Bonneville Crater.' The image shows rocky terrain surrounding the crater. The rover had to pick its way through that terrain on its way to the 'Columbia Hills,' in the distance on the left. Rolling terrain is apparent in the mid-distance. Barely visible to the right of the hills is the outline of the distant rim of Gusev Crater.

    This view is presented as cylindrical-perspective projection. It combines images from the left and right eyes of the panoramic camera, taken through blue filters on both sides.

    Figure 1 is the left-eye view of a stereo pair and Figure 2 is the right-eye view of a stereo pair.

  1. Valuation of selected environmental impacts associated with Bonneville Power Administration Resource Program alternatives

    SciTech Connect

    Englin, J E; Gygi, K F

    1992-03-01

    This report documents work undertaken by the Pacific Northwest Laboratory (PNL) and its contractors to assist the Bonneville Power Administration (Bonneville) in assessing the potential environmental consequences of new power resources. A major purpose of this effort is to describe and evaluate the techniques available for economic valuation of environmental costs. Another is to provide estimates of the environmental costs associated with specific power resources called for under Bonneville's Resource Programs. Bonneville's efforts to extend valuation techniques to as many impacts as can be reliably assessed represents a substantial advance in the application of state-of-the-art economic techniques to environmental assessments. This economic analysis evaluates effects on human health, wildlife, crops, and visibility impacts associated with air pollution. This report also discusses river recreation (primarily fishing) which may be affected by fluctuations in water levels. 70 refs.

  2. Late Pleistocene to early Holocene lake level and paleoclimate insights from Stansbury Island, Bonneville basin, Utah

    NASA Astrophysics Data System (ADS)

    Patrickson, Shela J.; Sack, Dorothy; Brunelle, Andrea R.; Moser, Katrina A.

    2010-03-01

    This paper reports on recent multiproxy research conducted to determine the chronology of lake-level fluctuations recorded in sediments from a natural exposure at a classic Bonneville basin site. Grain size, carbonate percentage, magnetic susceptibility, amount of charcoal, and diatom community composition data were collected from the 16 lacustrine units that compose the 122 cm stratigraphic column in Stansbury Gulch. Trends observed in the measured proxies reveal several significant changes in lake level, and thereby effective moisture, over the approximately 14,500 yr time span represented by the sediments. Results (1) verify the effectiveness of the multiproxy approach in Bonneville basin studies, which has been underutilized in this region, (2) reaffirm the double nature of Lake Bonneville's Stansbury oscillation, (3) suggest a previously undocumented post-Gilbert highstand of Great Salt Lake, and (4) identify possible teleconnections between climate events in the Bonneville basin and events in the North Atlantic at about 20,500 and 7500 14C yr BP.

  3. Bonneville Basin Analogues for Large Lake Processes & Chronologies of Geomorphic Development on Mars

    NASA Astrophysics Data System (ADS)

    Nicoll, K.; Chan, M. A.; Parker, T. J.; Jewell, P. W.; Komatsu, G.; Okubo, C. H.

    2009-03-01

    We present an inventory of geomorphic analogues for Lake Bonneville and Mars, with focus on potential standing-water features. The goal is to understand water as a geomorphic agent at a variety of temporal and spatial scales.

  4. Selected hydrologic data for the Bonneville Salt Flats and Pilot Valley, western Utah, 1991-93

    USGS Publications Warehouse

    Mason, James L.; Brothers, W.C.; Gerner, L.J.; Muir, P.S.

    1995-01-01

    This report contains hydrologic data collected during 1991-93 in the Bonneville Salt Flats and Pilot Valley study area of western Utah. These data were collected in cooperation with the U.S. Department of the Interior, Bureau of Land Management, as part of a study to investigate possible salt loss from the Bonneville Salt Flats. The Bonneville Salt Flats and adjacent Pilot Valley are located in the western part of the Great Salt Lake Desert in Utah, near the Nevada border. The Bonneville Salt Flats playa has a thick, perennial salt crust and the Pilot Valley playa has a thin, ephemeral salt crust. Well-completion data, including well depth and screened intervals, are presented in this report for selected shallow and deep monitoring wells. Water-level measurements are reported with corresponding specfic-gravity and temperature measurements. Results of chemical analyses are reported for brine collected from wells and pore fluids extracted from cores.

  5. 77 FR 18799 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    .... Environmental Protection Agency (EPA) sponsored questions related to water use on the 2007 CBECS. The water.... Energy Information Administration Proposed Agency Information Collection AGENCY: U.S. Energy Information Administration (EIA), Department of Energy (DOE). ACTION: Agency Information Collection Activities:...

  6. 1992-1993 Bonneville Appliance Efficiency Program: Showerhead evaluation. Volume I - report

    SciTech Connect

    Warwick, W.M.

    1995-01-01

    The Bonneville Power Administration (Bonneville) provides wholesale electric power to over 100 retail distribution utilities in the Pacific Northwest. Bonneville is faced with meeting growing loads from these utilities. It acquires conservation as one means of meeting this load growth. Bonneville has offered a variety of conservation programs since 1980. Efficient showerheads have been a feature in residential conservation programs ever since. Bonneville launched the Residential Appliance Efficiency Program to focus on water-heater energy conservation opportunities in 1992. The Residential Appliance Efficiency Program consists of two parts, a water-heater efficiency program, and a hot-water efficiency program. This report evaluates the savings and costs of the first two years of the showerhead portion of the Residential Appliance Efficiency Program (the showerhead program). Although it is not a formal evaluation of the program limited to implementation or a {open_quotes}process{close_quotes} evaluation, observations about program design and implementation are included as appropriate. Results of this evaluation are limited to program participants within the Bonneville service territory.

  7. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    SciTech Connect

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  8. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    SciTech Connect

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2011-02-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  9. Acción Mutua (Shared Action): a multipronged approach to delivering capacity-building assistance to agencies serving Latino communities in the United States.

    PubMed

    Ayala, George; Chión, Miguel; Díaz, Rafael M; Heckert, Andrea L; Nuño, Monica; del Pino, Homero E; Rodríguez, Claudia; Schroeder, Kurt; Smith, Terry

    2007-01-01

    Culturally appropriate, theory-based capacity-building assistance can serve a vital role in helping HIV prevention providers remain up-to-date, effective, and responsive to those they serve. Funded by the Centers for Disease Control and Prevention (CDC), AIDS Project Los Angeles, in collaboration with San Francisco State University's César E. Chávez Institute, conducted full-day site visits and qualitative interviews in 2005 with mid-level management staff of CDC-funded community-based organizations delivering HIV prevention services to Latino communities in the western region of the United States. We found that agencies we visited (1) had not yet adapted the evidence-based interventions they were using at the time of our visit and (2) requested technical assistance and training in the areas of program development, evaluation, group facilitation techniques, consumer recruitment, client retention, intervention adaptation, and materials development. Findings from this needs assessment were used to inform our seven-pronged approach to delivering capacity-building assistance entitled "Acción Mutua" (Shared Action). The approach emphasizes strategic partnerships, stakeholder involvement, organizational self-assessment, culturally appropriate materials development, interactive training, tailored onsite technical assistance, and professional networking opportunities. This article describes our approach in detail, the assessment process we used to develop it, and its implications for capacity-building practice. PMID:17159465

  10. Reinterpretation of the exposed record of the last two cycles of Lake Bonneville, Western United States

    USGS Publications Warehouse

    Scott, W.E.; McCoy, W.D.; Shroba, R.R.; Rubin, M.

    1983-01-01

    A substantially modified history of the last two cycles of Lake Bonneville is proposed. The Bonneville lake cycle began prior to 26,000 yr B.P.; the lake reached the Bonneville shoreline about 16,000 yr B.P. Poor dating control limits our knowledge of the timing of subsequent events. Lake level was maintained at the Bonneville shoreline until about 15,000 yr B.P., or somewhat later, when catastrophic downcutting of the outlet caused a rapid drop of 100 m. The Provo shoreline was formed as rates of isostatic uplift due to this unloading slowed. By 13,000 yr B.P., the lake had fallen below the Provo level and reached one close to that of Great Salt Lake by 11,000 yr B.P. Deposits of the Little Valley lake cycle are identified by their position below a marked unconformity and by amino acid ratios of their fossil gastropods. The maximum level of the Little Valley lake was well below the Bonneville shoreline. Based on degree of soil development and other evidence, the Little Valley lake cycle may be equivalent in age to marine oxygenisotope stage 6. The proposed lake history has climatic implications for the region. First, because the fluctuations of Lake Bonneville and Lake Lahontan during the last cycle of each were apparently out of phase, there may have been significant local differences in the timing and character of late Pleistocene climate changes in the Great Basin. Second, although the Bonneville and Little Valley lake cycles were broadly synchronous with maximum episodes of glaciation, environmental conditions necessary to generate large lakes did not exist during early Wisconsin time. ?? 1983.

  11. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2002-2003 Annual Report.

    SciTech Connect

    van der Naald, Wayne; Clark, Roy; Brooks, Robert

    2004-01-01

    In 2002 a total of 364 adult fall chinook and 472 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 290 fall chinook and 403 chum samples. The peak redd count for fall chinook was 214. The peak redd count for chum was 776. Peak spawning time for fall chinook was set at approximately 15 November. Peak spawning time for chum occurred approximately 6 December. There were estimated to be a total of 1,881 fall chinook spawning below Bonneville Dam in 2002. The study area's 2002 chum population was estimated to be 4,232 spawning fish. Temperature unit data suggests that below Bonneville Dam 2002 brood bright stock, fall chinook emergence began on February 3 2003 and ended 7 May 2003, with peak emergence occurring 20 April. 2002 brood juvenile chum emergence below Bonneville Dam began 27 January and continued through 6 April 2003. Peak chum emergence took place 1 March. A total of 10,925 juvenile chinook and 1,577 juvenile chum were sampled between the dates of 24 January and 21 July 2003 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2003 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2002 and 2003 the majority of fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock of fall chinook. Observed spawning times, adult age and sex composition, GSI and DNA analysis

  12. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2003-2004 Annual Report.

    SciTech Connect

    van der Naald, Wayne; Duff, Cameron; Brooks, Robert

    2005-01-01

    In 2003 a total of 253 adult fall chinook and 113 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 221 fall chinook and 109 chum samples. The peak redd count for fall chinook was 190. The peak redd count for chum was 262. Peak spawning time for fall chinook was set at approximately 24 November. Peak spawning time for chum occurred approximately 24 November. There were estimated to be a total of 1,533 fall chinook spawning below Bonneville Dam in 2003. The study area's 2003 chum population was estimated to be 688 spawning fish. Temperature unit data suggests that below Bonneville Dam 2003 brood bright stock, fall chinook emergence began on January 6, 2004 and ended 28 April 2004, with peak emergence occurring 13 April. 2003 brood juvenile chum emergence below Bonneville Dam began 22 February and continued through 15 April 2004. Peak chum emergence took place 25 March. A total of 25,433 juvenile chinook and 4,864 juvenile chum were sampled between the dates of 20 January and 28 June 2004 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2004 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2003 all of the fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence timing

  13. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    SciTech Connect

    N /A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  14. Bonneville Power Administration Transmission System Vegetation Management Program Draft Environmental Impact Statement

    SciTech Connect

    N /A

    1999-08-20

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from the electric facilities; (2) increase the program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This DEIS establishes Planning Steps for managing vegetation for specific projects (to be tiered to this EIS). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, they consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would factor a management approach that

  15. NEPA meets government reinvention: Bonneville Power Administration`s business plan E.I.S.

    SciTech Connect

    Wolfe, D.V.; Alton, C.; Linehan, A.O.

    1995-12-01

    During the early 1990`s Bonneville Power Administration (BPA) found its role as the Pacific Northwest`s largest wholesale marketer of electric power challenged by energy market deregulation, increasing competition from utilities and non-utility power sources, and uncertainty about future costs. Moreover, the rapid decline of endangered salmon stocks appeared to be leading to significant changes in the operations of the Columbia River hydroelectric system and limitations in the amount of hydro power BPA could sell its utility customers. In response, BPA began a fundamental review of all of its power and transmission products, rates, organization, and administrative procedures. BPA`s reinvention was clearly a major Federal action subject to NEPA, and the Business Plan EIS quickly became the focus of both BPA`s effort to question the fundamental mechanisms of its operations, and of the many customers, environmental organizations, and interest groups that watchdog BPA`s activities. In developing the Business Plan EIS, BPA faced multiple challenges: (1) complex, interrelated issues, including power sales contract terms, power rates, hydroelectric operations and salmon survival, transmission system deregulation, energy resource choices, conservation program reinvention, and fish and wildlife program management reform; (2) drawing appropriate boundaries around the subject of analysis instead of letting the EIS become the {open_quotes}black hole{close_quotes} for every regional environmental issue; (3) framing and evaluating broad policy choices in an understandable and useful manner without getting lost in the detail of the myriad decisions BPA faces; (4) keeping pace with evolving management thinking about BPA`s new direction; (5) linking Business Plan choices to market responses and ultimately to environmental impacts. The Business Plan EIS is an innovative effort to address broad policy directions, marketing relationships, and environmental impacts.

  16. Action Research in a Non-Profit Agency School Setting: Analyzing the Adoption of an Innovation after Initial Training and Coaching

    ERIC Educational Resources Information Center

    Sandoval-Lucero, Elena; Maes, Johanna B.; Pappas, Georgia

    2013-01-01

    Action research is a method of organizational development and improvement often used in educational settings. This study implemented an action research process in an alternative school that serves students with significant special needs. The action research process was implemented by classroom teams who developed a research question, collected and…

  17. Bonneville basin shoreline records of a large lake during Marine Isotope Stage 16

    NASA Astrophysics Data System (ADS)

    Nishizawa, Shizuo; Currey, Donald R.; Brunelle, Andrea; Sack, Dorothy

    2012-12-01

    The occurrence of the 650,000-year-old Rye Patch Dam tephra within shoreline sedimentary sequences suggests the presence of a large lake in the Bonneville basin in North America during Marine Isotope Stage (MIS) 16. The observed shoreline sedimentology and stratigraphy indicate that the lake was expanding when the air-fall ash landed onto the lake water. The minimum estimated surface area of the 650 ka lake almost equals that of Lake Bonneville during the Provo stage in late MIS 2. The magnitude of the 650 ka large lake implies that the climatic and hydrologic conditions in the Bonneville basin during early MIS 16 might have been comparable to those in late MIS 2.

  18. Inspection of surveillance activities and administrative leave policy at Bonneville Power Administration, Portland, Oregon

    SciTech Connect

    Not Available

    1994-04-01

    The authors conducted an inspection of surveillance activities and administrative leave policy at the Bonneville Power Administration, Portland, Oregon. The purpose of their inspection was to determine if a covert video surveillance operation conducted at Bonneville Power Administration was consistent with Department of Energy policies and procedures and other applicable regulations and procedures, and to determine if administrative leave policies and procedures used at Bonneville Power Administration in a specific instance were consistent with Department of Energy requirements and the Code of Federal Regulations. This inspection focused on a specific incident that occurred in 1989 on the 5th floor of the BPA Headquarters Building located in Portland, Oregon. The incident involved the soiling of an employee`s personal property with what appeared to be urine.

  19. 76 FR 28757 - Defense Logistics Agency Revised Regulation 1000.22, Environmental Considerations in Defense...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... of the Secretary Defense Logistics Agency Revised Regulation 1000.22, Environmental Considerations in Defense Logistics Agency Actions AGENCY: Defense Logistics Agency, Department of Defense. ACTION: Notice of Availability (NOA) of Revised Defense Logistics Agency Regulation. SUMMARY: The Defense...

  20. Follow-up process evaluation of Bonneville Power Administration's energy savings plan program

    SciTech Connect

    Jennings, J.G.; Peters, J.S. )

    1990-01-01

    The Energy $avings Plan (E$P) program has been operated by the Bonneville Power Administration (Bonneville) since late fall 1987. The program is designed to build capability in the acquisition of conservation resources in the non-aluminum industrial sector in the Pacific Northwest. According to the Northwest Power Planning Council, the non-aluminum industrial sector accounts for about 23% of the total regional electricity consumption. Five non-aluminum industries consume 85% of this total. Three major industries --- chemical producers, pulp and paper plants, and lumber mills --- account for around 68% of non-aluminum industrial consumption (i.e., 16% of the total regional electricity consumption). 1 ref.

  1. Evaluation of Bonneville's 1988 and 1989 Residential Weatherization Program: A Northwest study of program dynamics

    SciTech Connect

    Brown, M.A.; White, D.L.

    1992-12-01

    This study continues the series of evaluations of the Bonneville Power Administration's long-term Residential Weatherization Program (RWP) by examining the energy saved by its 1988 and 1989 participants. The sample of participants for this study was drawn from 10 utilities covering the region's three climate zones. Six of these utilities were included in the 1988 RWP evaluation, and eight of them were included in the 1989 RWP evaluation. This study analyzes data on 356 participating households in 1988, 433 participants in 1989, and a comparison group of 1170 nonparticipants in 1988 and 1466 in 1989. Previous evaluations of Bonneville's earlier weatherization programs provide an historic context for analyzing program dynamics.

  2. The Bonneville Estates Rockshelter rodent fauna and changes in Late Pleistocene-Middle Holocene climates and biogeography in the Northern Bonneville Basin, USA

    NASA Astrophysics Data System (ADS)

    Schmitt, Dave N.; Lupo, Karen D.

    2012-07-01

    Excavations at Bonneville Estates Rockshelter, Nevada recovered rodent remains from stratified deposits spanning the past ca. 12,500 14C yr BP (14,800 cal yr BP). Specimens from horizons dating to the late Pleistocene and early Holocene include species adapted to montane and moist and cool habitats, including yellow-bellied marmot (Marmota flaviventris) and bushy-tailed woodrat (Neotoma cinerea). Shortly after 9000 14C BP (10,200 cal yr BP) these mammals became locally extinct, or nearly so, taxonomic diversity declined, and the region became dominated by desert woodrats (Neotoma lepida) and other species well-adapted to xeric, low-elevation settings. The timing and nature of changes in the Bonneville Estates rodent fauna are similar to records reported from nearby Homestead and Camels Back caves and provide corroborative data on terminal Pleistocene-early Holocene environments and mammalian responses to middle Holocene desertification. Moreover, the presence of northern pocket gopher (Thomomys talpoides) at Bonneville Estates adds to a sparse regional record for that species and, similar to Homestead Cave, it appears that the ca. 9500 14C yr BP (10,800 cal yr BP) replacement of the northern pocket gopher by Botta's pocket gopher in the Great Salt Lake Desert vicinity was also in response to climate change.

  3. 77 FR 43067 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    .... Energy Information Administration Proposed Agency Information Collection AGENCY: U.S. Energy Information Administration (EIA), Department of Energy (DOE). ACTION: Agency Information Collection Activities: Proposed Information Collection; Notice and Request for Comments. SUMMARY: The EIA is soliciting comments on...

  4. 77 FR 17464 - Agency Information Collection Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    .... Energy Information Administration Agency Information Collection Extension AGENCY: U.S. Energy Information Administration (EIA), Department of Energy. ACTION: Agency Information Collection Activities: Information...) Whether the proposed collection of information is necessary for the proper performance of the functions...

  5. 77 FR 23704 - Agency Information Collection Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    .... Energy Information Administration Agency Information Collection Extension AGENCY: U.S. Energy Information Administration (EIA), Department of Energy (DOE). ACTION: Agency Information Collection Activities: Information... Remittance Advice (RA) forms. Comments are invited on: (a) Whether the proposed collection of information...

  6. 75 FR 41165 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-15

    ... Administrator of the Environmental Protection Agency (EPA) assessing whether the renewable fuel standard (RFS... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: Department of Energy. ACTION: Notice and request for...

  7. The role of forensic medical services of Azerbaijan Republic in cases of natural calamities, terrorist actions and other urgent situations--organizational principles of joint activities of forensic medical services and the law-enforcement agencies.

    PubMed

    Youssifli, R M; Hassanov, E G

    1996-01-01

    Disastrous natural calamities, large-scale catastrophes and terrorist actions are characterized by a sudden and unexpected character and lead to numerous human victims. As a rule this fact seriously aggravates the work of local medical service and the law-enforcement agencies. Nowadays not a single society can totally guarantee itself from the danger of natural calamities, terrorist actions and emergency situations. Taking into consideration peculiarities of our country and also aware of the international experience a brand new set of preventive measures was elaborated by forensic experts of Azerbaijan in close cooperation with the law-enforcement bodies. The basic purpose of these sets of actions is to relieve the consequences of such kinds of unpredictable cases. PMID:8908988

  8. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    SciTech Connect

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  9. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER...

  10. Pleistocene Lake Bonneville and Eberswalde Crater of Mars: Quantitative Methods for Recognizing Poorly Developed Lacustrine Shorelines

    NASA Astrophysics Data System (ADS)

    Jewell, P. W.

    2014-12-01

    The ability to quantify shoreline features on Earth has been aided by advances in acquisition of high-resolution topography through laser imaging and photogrammetry. Well-defined and well-documented features such as the Bonneville, Provo, and Stansbury shorelines of Late Pleistocene Lake Bonneville are recognizable to the untrained eye and easily mappable on aerial photos. The continuity and correlation of lesser shorelines must rely quantitative algorithms for processing high-resolution data in order to gain widespread scientific acceptance. Using Savitsky-Golay filters and the geomorphic methods and criteria described by Hare et al. [2001], minor, transgressive, erosional shorelines of Lake Bonneville have been identified and correlated across the basin with varying degrees of statistical confidence. Results solve one of the key paradoxes of Lake Bonneville first described by G. K. Gilbert in the late 19th century and point the way for understanding climatically driven oscillations of the Last Glacial Maximum in the Great Basin of the United States. Similar techniques have been applied to the Eberswalde Crater area of Mars using HRiSE DEMs (1 m horizontal resolution) where a paleolake is hypothesized to have existed. Results illustrate the challenges of identifying shorelines where long term aeolian processes have degraded the shorelines and field validation is not possible. The work illustrates the promises and challenges of indentifying remnants of a global ocean elsewhere on the red planet.

  11. Multi-Scale Action Effectiveness Research in the Lower Columbia River and Estuary, 2011 - FINAL ANNUAL REPORT

    SciTech Connect

    Sather, Nichole K.; Storch, Adam; Johnson, Gary E.; Teel, D. J.; Skalski, J. R.; Bryson, Amanda J.; Kaufmann, Ronald M.; Woodruff, Dana L.; Blaine, Jennifer; Kuligowski, D. R.; Kropp, Roy K.; Dawley, Earl M.

    2012-05-31

    The study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL), the Oregon Department of Fish and Wildlife (ODFW), the University of Washington (UW), and the National Marine Fisheries Service (NMFS) for the U.S. Army Corps of Engineers, Portland District (USACE). This research project was initiated in 2007 by the Bonneville Power Administration to investigate critical uncertainties regarding juvenile salmon ecology in shallow tidal freshwater habitats of the lower Columbia River. However, as part of the Washington Memorandum of Agreement, the project was transferred to the USACE in 2010. In transferring from BPA to the USACE, the focus of the tidal freshwater research project shifted from fundamental ecology toward the effectiveness of restoration in the Lower Columbia River and estuary (LCRE). The research is conducted within the Action Agencies Columbia Estuary Ecosystem Restoration Program (CEERP). Data reported herein spans the time period May 2010 to September 2011.

  12. The rise and fall of Lake Bonneville between 45 and 10.5 ka

    USGS Publications Warehouse

    Benson, L.V.; Lund, S.P.; Smoot, J.P.; Rhode, D.E.; Spencer, R.J.; Verosub, K.L.; Louderback, L.A.; Johnson, C.A.; Rye, R.O.; Negrini, R.M.

    2011-01-01

    A sediment core taken from the western edge of the Bonneville Basin has provided high-resolution proxy records of relative lake-size change for the period 45.1-10.5 calendar ka (hereafter ka). Age control was provided by a paleomagnetic secular variation (PSV)-based age model for Blue Lake core BL04-4. Continuous records of ??18O and total inorganic carbon (TIC) generally match an earlier lake-level envelope based on outcrops and geomorphic features, but with differences in the timing of some hydrologic events/states. The Stansbury Oscillation was found to consist of two oscillations centered on 25 and 24 ka. Lake Bonneville appears to have reached its geomorphic highstand and began spilling at 18.5 ka. The fall from the highstand to the Provo level occurred at 17.0 ka and the lake intermittently overflowed at the Provo level until 15.2 ka, at which time the lake fell again, bottoming out at ~14.7 ka. The lake also fell briefly below the Provo level at ~15.9 ka. Carbonate and ??18O data indicate that between 14.7 and 13.1 ka the lake slowly rose to the Gilbert shoreline and remained at about that elevation until 11.6 ka, when it fell again. Chemical and sedimentological data indicate that a marsh formed in the Blue Lake area at 10.5 ka.Relatively dry periods in the BL04-4 records are associated with Heinrich events H1-H4, suggesting that either the warming that closely followed a Heinrich event increased the evaporation rate in the Bonneville Basin and (or) that the core of the polar jet stream (PJS) shifted north of the Bonneville Basin in response to massive losses of ice from the Laurentide Ice Sheet (LIS) during the Heinrich event. The second Stansbury Oscillation occurred during Heinrich event H2, and the Gilbert wet event occurred during the Younger Dryas cold interval. Several relatively wet events in BL04-4 occur during Dansgaard-Oeschger (DO) warm events.The growth of the Bear River glacier between 32 and 17 ka paralleled changes in the values of proxy

  13. 75 FR 69688 - Agency Information Collection Activities: Regulation on Agency Protests

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... SECURITY Agency Information Collection Activities: Regulation on Agency Protests AGENCY: Office of Chief Procurement Officer, Acquisition Policy and Legislation Office, DHS. ACTION: 60-Day Notice and request for... Chief Procurement Officer, Acquisition Policy and Legislation Office, will submit the...

  14. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    SciTech Connect

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  15. Hatchery Evaluation Report / Bonneville Hatchery - Urb Fall Chinook : An Independent Audit Based on Integrated Hatchery Operations Team (IHOT) Performance Measures : Final Report.

    SciTech Connect

    Watson, Montgomery

    1996-05-01

    This report presents the findings of the independent audit of the Bonneville Hatchery (Upriver bright [URB] Fall Chinook). The hatchery is located on the Columbia River just west of Cascade Locks, Oregon. The hatchery is used for adult collection, egg incubation, and rearing of Tule Fall Chinook and URB Fall Chinook. The audit was conducted in April 1996 as part of at two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the U.S. Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife.

  16. Hatchery Evaluation Report / Bonneville Hatchery - Tule Fall Chinook : An Independent Audit Based on Integrated Hatchery Operations Team (IHOT) Performance Measures : Final Report.

    SciTech Connect

    Watson, Montgomery

    1996-05-01

    This report presents the findings of the independent audit of the Bonneville Hatchery (Tule Fall Chinook). The hatchery is located on the Columbia River just west of Cascade Locks, Oregon. The hatchery is used for adult collection, egg incubation, and rearing of Tule Fall Chinook and URB Fall Chinook. The audit was conducted in April 1996 as part of a two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the U.S. Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife.

  17. 77 FR 50207 - Notice of Final Federal Agency Actions on Project: I-5: Glendale-Hugo Paving/Sexton Climbing Lane...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ...) 316-2559; Dominic Yballe, US Army Corps of Engineers, P.O. Box 2946, Portland, Oregon 97208-2946... Conservation and Recovery Act (RCRA), [42 U.S.C. 6901- 6992(k)]. 9. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988 Floodplain Management; E.O. 12898, Federal Actions to Address Environmental Justice...

  18. Improved Stratigraphic Interpretation of Dense Lacustrine Carbonates from Lake Bonneville, UT

    NASA Astrophysics Data System (ADS)

    Steponaitis, E.; McGee, D.; Quade, J.

    2014-12-01

    Recent work on the past hydroclimate of the Bonneville Basin has utilized dense, laminated carbonate deposits that formed beneath the surface of Lake Bonneville starting around 26 ka (McGee et al. 2012). These calcite and aragonite deposits form in calm, protected spaces that have been submerged by the lake, including hillside caves, cracks in bedrock, and interstitial spaces in tufa and abandoned beach gravel deposits. Dense lacustrine carbonates are very useful for paleoclimate studies because they can be used to develop continuous records of lake chemistry anchored by precise U-Th dates. However, many questions remain about the conditions in which these dense carbonates form: at what depth range do these carbonates form, and can basal and top ages help constrain the lake level curve? Do coeval carbonates formed at different depths in the lake preserve information about vertical gradients in lake water properties like δ18O and 87Sr/86Sr? To address these questions and others, this study examines a sequence of dense lacustrine carbonates deposited within bedrock, tufa, and abandoned shoreline gravels from Stansbury Island, UT. We use U-Th dating, local stratigraphic interpretations, and previously established lake level constraints to draw insights into the formation and context of these deposits. Improved understanding of dense lacustrine carbonates will facilitate more detailed and accurate interpretations of their stratigraphic significance, and ultimately, aid the development of improved paleoclimate records from Lake Bonneville and beyond. McGee, D., et al. 2012. Lacustrine Cave Carbonates : Novel Archives of Paleohydrologic Change in the Bonneville Basin (Utah , USA). Earth and Planetary Science Letters (351-352): 182-194.

  19. 78 FR 52190 - United States Department of Energy, Bonneville Power Administration: Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EF13-7-000, EF13-8-000, EF13-9-000, EF13-10-000, EF13-11- 000, EF13-12-000, EF13-13-000, EF13-14-000] United States Department of Energy, Bonneville Power Administration: Notice of Filing Take notice that...

  20. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    SciTech Connect

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  1. Pleistocene Lake Bonneville as an analog for extraterrestrial lakes and oceans: Chapter 21

    USGS Publications Warehouse

    Chan, M.A.; Jewell, P.; Parker, T.J.; Ormo, J.; Okubo, Chris; Komatsu, G.

    2016-01-01

    Geomorphic confirmation for a putative ancient Mars ocean relies on analog comparisons of coastal-like features such as shoreline feature attributes and temporal scales of process formation. Pleistocene Lake Bonneville is one of the few large, geologically young, terrestrial lake systems that exemplify well-preserved shoreline characteristics that formed quickly, on the order of a thousand years or less. Studies of Lake Bonneville provide two essential analog considerations for interpreting shorelines on Mars: (1) morphological variations in expression depend on constructional vs erosional processes, and (2) shorelines are not always correlative at an equipotential elevation across a basin due to isostasy, heat flow, wave setup, fetch, and other factors. Although other large terrestrial lake systems display supporting evidence for geomorphic comparisons, Lake Bonneville encompasses the most integrated examples of preserved coastal features related to basin history, sediment supply, climate, and fetch, all within the context of a detailed hydrograph. These collective terrestrial lessons provide a framework to evaluate possible boundary conditions for ancient Mars hydrology and large water body environmental feedbacks. This knowledge of shoreline characteristics, processes, and environments can support explorations of habitable environments and guide future mission explorations.

  2. Geologic Interpretation of the Geothermal Potential of the North Bonneville Area

    SciTech Connect

    Nielson, D.L.; Moran, M.R.

    1980-02-15

    Possible geothermal development for the township of North Bonneville, Washington is being investigated because of the proximity of the town to hot springs in a geologic province of good geothermal potential. Surface expression of geothermal resources is provided by conduits through an impermeable reservoir cap and is therefore generally structurally controlled. Near North Bonneville the geologic formations that underlie potential drilling sites are the Eagle Creek formation and the Ohanpecosh Formation. The Lower Miocene Eagle Creek Formation is composed of poorly consolidated volcanic conglomerates, sandstones, tuffs, and includes a few minor interbedded lava flows. The Eocene-Oligiocene Ohanapecosh (Weigle) Formation in its nearest exposures to North Bonneville is composed of volcaniclastics and lava flows. The Ohanapecosh has been altered to zeolites and clays and is therefore well consolidated and impermeable. The lack of permeability provides the necessary reservoir cap for any geothermal system that may be present at depth. This formation, to the northeast, in the Wind River drainage is greater than 19,000 ft. thick. Circulation of geothermal heated water from this thick sequence of impermeable strata must be associated with penetrating fracture zones.

  3. Genetic diversity and divergence among freshwater mussel (Anodonta) populations in the Bonneville Basin of Utah.

    PubMed

    Mock, K E; Brim-Box, J C; Miller, M P; Downing, M E; Hoeh, W R

    2004-05-01

    Populations of the freshwater mussel genus Anodonta appear to be in a state of rapid decline in western North America, following a trend that unfortunately seems to be prevalent among these animals (Mollusca: Unionoida). Here we describe the patterns of molecular divergence and diversity among Anodonta populations in the Bonneville Basin, a large sub-basin of the Great Basin in western North America. Using amplified fragment length polymorphism (AFLP) analysis, we found a striking lack of nuclear diversity within some of these populations, along with a high degree of structuring among populations (FST = 0.61), suggesting post-Pleistocene isolation, due either to a long-term loss of hydrologic connectivity among populations or to more recent fish introductions. We also found evidence of recent hybridization in one of these populations, possibly mediated by fish-stocking practices. Using mitochondrial sequence data, we compared the Bonneville Basin populations to Anodonta in several other drainages in western North America. We found a general lack of resolution in these phylogenetic reconstructions, although there was a tendency for the Bonneville Basin Anodonta (tentatively A. californiensis) to cluster with A. oregonensis from the adjacent Lahontan Basin in Nevada. We recommend further investigation of anthropogenic factors that may be contributing to the decline of western Anodonta and a broad-scale analysis and synthesis of genetic and morphological variation among Anodonta in western North America. PMID:15078447

  4. Conservation Action Handbook.

    ERIC Educational Resources Information Center

    National Rifle Association, Washington, DC.

    Conservation problems are identified, with some suggestions for action. General areas covered are: Wildlife Conservation, Soil Conservation, Clean Water, Air Pollution Action, and Outdoor Recreation Action. Appendices list private organizations or agencies concerned with natural resource use and/or management, congressional committees considering…

  5. Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam

    SciTech Connect

    Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

    2007-01-30

    At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at

  6. Statistical analysis of sand and gravel aggregate deposits of late Pleistocene Lake Bonneville, Utah

    USGS Publications Warehouse

    Bliss, James D.; Bolm, K.S.

    2001-01-01

    Sedimentary deposits of pluvial Lake Bonneville are an important source of sand and gravel suitable for aggregate and construction in Utah. Data on Lake Bonneville basin sand and gravel deposit thickness, volume, grain size, percent of fines, and durability were statistically analyzed to detect variations associated with geologic domains, geographic location, Lake Bonneville shorelines, and sand and gravel deposit type, and to construct quantitative deposit models. Analysis showed several trends; (1) sand and gravel in younger shorelines was slightly more durable and the deposits considerably larger in volume, (2) younger shorelines are also more likely to contain more than one genetic deposit type, (3) the volume of terrace deposits is larger than beach deposits, (4) terraces and beaches are generally thicker than spits and bars, (5) the northern part of the Bonneville Basin contains slightly more durable sand and gravel than the southern part of the basin and is more likely to contain deposits composed of more than one genetic deposit type, and (6) the Wasatch domain deposits are composed of more than one genetic deposit type more often than deposits of the Basin and Range domain. Three additional conclusions with immediate economic significance are; (1) the median sand and gravel deposit in the Wasatch domain, 360,000 m3 (275,000 yd3), is three times larger than that of the Basin and Range domain (120,000 m3 [90,000 yd3]), (2) the median deposit thickness in the Wasatch domain, 5.8 m (19.0 ft), is nearly twice that of the Basin and Range domain (3 m [10 ft]), and (3) the Wasatch domain also contains slightly larger diameter gravel. These three conclusions are significant because the trend for sand and gravel development in the Bonneville Basin is to move from the Wasatch domain to the Basin and Range domain. Smaller, thinner deposits with smaller diameter gravel will require more surface area to mine than would have been necessary in the Wasatch domain. The

  7. To prohibit the Central Intelligence Agency from using an unmanned aerial vehicle to carry out a weapons strike or other deliberately lethal action and to transfer the authority to conduct such strikes or lethal action to the Department of Defense.

    THOMAS, 113th Congress

    Rep. Burgess, Michael C. [R-TX-26

    2014-02-11

    02/11/2014 Referred to the Committee on Intelligence (Permanent Select), and in addition to the Committee on Armed Services, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee... (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  8. 76 FR 67734 - Agency Information Collection Activities; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities; Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  9. 77 FR 55475 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  10. 78 FR 57157 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  11. 76 FR 38397 - Agency Information Collection Activities; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities; Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  12. 78 FR 38979 - Agency Information Collection Activities; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities; Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  13. 76 FR 57048 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  14. 75 FR 11540 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  15. 76 FR 17865 - Agency Information Collection Activities; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities; Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  16. 75 FR 23269 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-03

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  17. 75 FR 38107 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-01

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  18. 78 FR 52927 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  19. 77 FR 37047 - Agency Information Collection Activities; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities; Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  20. 76 FR 46811 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  1. 78 FR 39304 - Agency Information Collection Activities: Proposed Collection; Comment Request; FEMA Preparedness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Proposed Collection; Comment Request; FEMA Preparedness Grants: Operation Stonegarden (OPSG) AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency, as part of...

  2. 76 FR 30364 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  3. 76 FR 10900 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  4. 78 FR 69088 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  5. 78 FR 49518 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  6. 75 FR 16134 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  7. 75 FR 3908 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  8. 78 FR 75573 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-12

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB Review; Comment Request AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted below to...

  9. 75 FR 38115 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-01

    ... Investment Justification Template. SUMMARY: The Federal Emergency Management Agency (FEMA) has submitted the... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB... (SHSP) Tribal AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice; 30-day notice...

  10. 75 FR 8387 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... Emergency Management Agency (FEMA) has submitted the information collection abstracted below to the Office... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB... Program (DLSGP) AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice; 30-day notice...

  11. 75 FR 8389 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... Investment Justification. SUMMARY: The Federal Emergency Management Agency (FEMA) has submitted the... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB... Communications Grant Program (IECGP) AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice;...

  12. 75 FR 43995 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ...). SUMMARY: The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB... Sheet AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice; 30-day notice and request...

  13. 75 FR 8385 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... Template. SUMMARY: The Federal Emergency Management Agency (FEMA) has submitted the information collection... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB... (IBSGP) AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice; 30-day notice and request...

  14. 75 FR 8389 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    .... SUMMARY: The Federal Emergency Management Agency (FEMA) has submitted the information collection... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB... (FRSGP) AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice; 30-day notice and request...

  15. 75 FR 8385 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    .... SUMMARY: The Federal Emergency Management Agency (FEMA) has submitted the information collection... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB...) AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice; 30-day notice and request for...

  16. 76 FR 21746 - Agency Information Collection Activities: Proposed Collection; Comment Request; Generic Clearance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities... Agency Service Delivery AGENCY: Agency for Healthcare Research and Quality (AHRQ), HHS. ACTION: Notice... public on service delivery, AHRQ [has submitted a Generic Information Collection Request (Generic...

  17. 75 FR 53306 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  18. 78 FR 35296 - Agency Information Collection Activities; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities; Proposed Collection; Comment Request AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency, as part of its continuing effort to reduce paperwork and respondent...

  19. 76 FR 70745 - Agency Information Collection Activities: Proposed Collection; Comment Request; National Flood...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Proposed Collection; Comment Request; National Flood Insurance Program--Mortgage Portfolio Protection Program AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency, as...

  20. 75 FR 36650 - Agency Information Collection Activities: Proposed Collection; Comment Request; Recordkeeping...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... AGENCY Agency Information Collection Activities: Proposed Collection; Comment Request; Recordkeeping... Number 2070-0028 AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: In compliance...), Environmental Protection Agency, EPA Docket Center (EPA/DC), Mail Code: 28221T, 1200 Pennsylvania Avenue,...

  1. 75 FR 57033 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  2. 76 FR 81944 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  3. 77 FR 40885 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  4. 75 FR 53305 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... HUMAN SERVICES Agency for Healthcare Research and Quality Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: Agency for Healthcare Research and Quality, HHS. ACTION: Notice. SUMMARY: This notice announces the intention of the Agency for Healthcare Research and...

  5. 76 FR 71991 - Agency Information Collection Activities: Proposed Collection; Comment Request, Emergency...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Proposed Collection; Comment Request, Emergency Management Institute Course Evaluation Form AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency, as part of...

  6. Metacognition of Agency

    ERIC Educational Resources Information Center

    Metcalfe, Janet; Greene, Matthew Jason

    2007-01-01

    The feeling that we are agents, intentionally making things happen by our own actions, is foundational to our understanding of ourselves as humans. People's metacognitions of agency were investigated in 4 experiments. Participants played a game in which they tried to touch downward scrolling Xs and avoid touching Os. Variables that affected…

  7. 78 FR 53135 - Agency Information Collection Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... available on the Internet at: http://www.eia.gov/survey/#coal . SUPPLEMENTARY INFORMATION: This information... Information Administration Agency Information Collection Extension AGENCY: U.S. Energy Information Administration (EIA), Department of Energy (DOE). ACTION: Information collection extension with change,...

  8. 78 FR 11175 - Agency Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... COMMISSION Agency Information Collection Activities AGENCY: Equal Employment Opportunity Commission. ACTION: Notice of Information Collection--Revised: Demographic Information on Applicants for Federal Employment... (Demographic Information on Applicants, OMB No. 3046-0046) to include disability status data. DATES:...

  9. 75 FR 4054 - Agency Information Collection Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... Information Collection Extension AGENCY: Department of Energy. ACTION: Agency Information Collection... of an information collection request with the Office of Management and Budget (OMB). DOE is now is... request, the Recovery Act Reviewer Web site information collection request, covers information...

  10. 76 FR 6470 - Agency Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... From the Federal Register Online via the Government Publishing Office EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Agency Information Collection Activities AGENCY: Equal Employment Opportunity Commission. ACTION... Information Report (EEO-4). SUMMARY: In accordance with the Paperwork Reduction Act, the Equal...

  11. 76 FR 6469 - Agency Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... From the Federal Register Online via the Government Publishing Office EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Agency Information Collection Activities AGENCY: Equal Employment Opportunity Commission. ACTION...: In accordance with the Paperwork Reduction Act, the Equal Employment Opportunity Commission (EEOC...

  12. 76 FR 6471 - Agency Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... From the Federal Register Online via the Government Publishing Office EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Agency Information Collection Activities AGENCY: Equal Employment Opportunity Commission. ACTION... accordance with the Paperwork Reduction Act, the Equal Employment Opportunity Commission (EEOC or...

  13. 77 FR 9923 - Agency Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... From the Federal Register Online via the Government Publishing Office EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Agency Information Collection Activities AGENCY: Equal Employment Opportunity Commission. ACTION... Federal Employment. SUMMARY: In accordance with the Paperwork Reduction Act, the Equal...

  14. 75 FR 36375 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: Department of Energy. ACTION: Notice and request for OMB... the use of automated collection techniques or other forms of information technology. DATES:...

  15. 75 FR 38514 - Agency Information Collection Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Agency Information Collection Extension AGENCY: Department of Energy. ACTION: Notice and request for comments... forms of information technology. DATES: Comments regarding this proposed information collection must...

  16. Bonneville Powerhouse 2 3D CFD for the Behavioral Guidance System

    SciTech Connect

    Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.

    2010-02-01

    In 2008 and 2009, a 700 ft long, 10-ft deep floating forebay guidance wall called a behavioral guidance structure (BGS) was deployed in the Bonneville Powerhouse 2 forebay. The US Army Corps of Engineers, Portland District (CENWP) contracted with the Pacific Northwest National Laboratory (PNNL) to develop computational tools to assess the impact of the BGS on forebay hydraulics (this study). The tools developed here to provide a characterization of forebay hydraulics to be integrated with acoustic telemetry studies designed to measure the impact on juvenile salmon guidance and survival through Bonneville Powerhouse 2. In previous work, PNNL performed computational fluid dynamics (CFD) studies for the Bonneville forebay for CENWP. In this study, the existing model was modified to include the BGS. The model included a bay-by-bay spillway, a truncated Powerhouse 1 forebay, Powerhouse 2 turbine intakes and corner collector, and the forebay bathymetry extending approximately 1.5km upstream from the tip of Cascade Island. Model validation outcomes were similar to that of past studies. Additional checks were included on the impact of the differencing scheme to flow solution. It was found that using upwind differencing was adequate and it was possible to use a truncated computational mesh of this model that included a BGS upstream of Powerhouse 2 and increased spatial resolution in the vicinity of the BGS. This model has been validated, run, and provided to CENWP to use for additional analysis of the Powerhouse 2 forebay hydraulics. The PNNL particle tracking software (PT6) was used to assess the impacts of mass and relative buoyancy on particle fate. The particle tracker was run for the Half Load case for the clean forebay and for the forebay with the BGS in place and the Corner Collector on. All tracker cases showed that the BGS moved the particles across the forebay increasing the number of particles exiting the model through the Corner Collector and (for streamlines

  17. Uranium-bearing coal and carbonaceous rocks in the Fall Creek area, Bonneville County, Idaho

    USGS Publications Warehouse

    Vine, James D.; Moore, George Winfred

    1952-01-01

    Uraniferous coal, carbonaceous shale, and carbonaceous limestone occur in the Bear River formation of Early Cretaceous age at the Fall Creek prospect, in the Fall Creek area, Bonneville County, Idaho. The uranium compounds are believed to have been derived from mildly radioactive silicic volcanic rocks of Tertiary age that rest unconformably on all older rocks and once overlay the Bear River formation and its coal. Meteoric water, percolating downward through the silicic volcanic rocks and into the older rocks along joints and faults, is believed to have brought the uranium compounds into contact with the coal and carbonaceous rocks in which the uranium was absorbed.

  18. Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

    2009-12-28

    This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

  19. Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

    2008-12-01

    The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

  20. Use of a regional atmospheric model to simulate lake-atmosphere feedbacks associated with Pleistocene Lakes Lahontan and Bonneville

    USGS Publications Warehouse

    Hostetler, S.W.; Giorgi, F.

    1992-01-01

    A regional model of the atmosphere (version 4 of the NCAR mesoscale model, MM4) was used to assess whether lake-effect precipitation was a significant component of the late-Pleistocene hydrologic budgets of Lakes Lahontan and Bonneville. Control simulations for January and July of 1979 were made using MM4, and the Pleistocene highstand surface areas of the lakes were added to the model and the simulations repeated. In the January simulations, 18% of the moisture added to the modeled atmosphere by Lake Lahontan returned to the Lahontan basin as precipitation, while 32% of the water evaporated from Lake Bonneville fell as precipitation over the Bonneville basin. In the July simulations, 7% of the moisture added to the modeled atmosphere by Lake Lahontan returned to the Lahontan basin as precipitation, and 4% of the water evaporated from Lake Bonneville fell as precipitation over the Bonneville basin. An additonal January simulation was made with the lake surface areas set at onehalf their highstand extents (the average surface area 20 to 15 ka BP). Results from this simulation were similar to the simulation with the highstand lakes, indicating lake-effect precipitation could have been a significant component of the hyrologic budgets of the lakes before and during the highstand period. ?? 1992 Springer-Verlag.

  1. 5 CFR 720.303 - Agency programs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) AFFIRMATIVE EMPLOYMENT PROGRAMS Disabled Veterans Affirmative Action Program § 720.303 Agency programs. (a.... Postal Service and the Postal Rate Commission, shall conduct a continuing affirmative program for the... then be translated into action items....

  2. Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009

    SciTech Connect

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

    2011-03-01

    Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  3. Constraining paleotemperature and water isotope signals at Lake Bonneville using carbonate clumped isotopes

    NASA Astrophysics Data System (ADS)

    Mering, J. A.; Oviatt, C. G.; Petryshyn, V. A.; Canet, J.; Tripati, A.

    2013-12-01

    Lake Bonneville was the largest pluvial system in the Great Basin during the Last Glacial Maximum (23-19 ka BP), reaching nearly 50,000 square kilometers at its high stand. Carbonate clumped isotope paleothermometry provides a new avenue to evaluate lake and atmospheric conditions by constraining the temperature and oxygen isotope ratios of lake water. Here, we present estimates of lake temperature, the oxygen isotope composition of paleowater, and Mean Annual Air Temperature (MAAT) from LGM paleoshoreline sites in Utah and Eastern Nevada. Multiple phases of ancient carbonate were evaluated, including endogenic carbonate from the ubiquitous Bonneville marl stratigraphic unit, and aragonitic shells of two species of aquatic gastropods (genera Pyrgulopsis and Stagnicola) collected from littoral deposits adjacent to the marl. These phases should record surface water conditions. Preliminary results indicate that paleotemperature estimates from gastropods and marl are similar at any given site. However, the latitudinal water isotope gradient reconstructed using marls is steeper than that reconstructed from gastropods, indicating that perhaps carbonate precipitation in marl is more evaporation-driven than shell growth of aquatic snails. Comparison with recent climate data, and clumped isotope measurements of modern samples from the Great Salt Lake, supports moderate temperature change in the Great Basin from the Last Glacial Maximum to present.

  4. Late Pleistocene Hansel Valley basaltic ash, northern Lake Bonneville, Utah, USA

    USGS Publications Warehouse

    Miller, D.M.; Oviatt, Charles G.; Nash, B.P.

    2008-01-01

    The Hansel Valley ash bed lies within 5 cm of the base of deposits of Lake Bonneville (???28 ka) in the vicinity of Great Salt Lake and provides a useful stratigraphic marker for this area of the lake basin. However, it has not been matched to an eruptive edifice, presumably because such an edifice was eroded by waves of Lake Bonneville. We present data for the chemical composition of the tephra and for possible matching lavas and tephras of the region, as well as grain size data for the tephra in an attempt to identify the location of the eruption. Matches with other tephras are negative, but lavas near the coarsest ash deposits match well with the distinctive high values of TiO2 and P2O5 of the ash. Neither chemistry nor grain size data points uniquely to a source area, but an area near the northwest shore of Great Salt Lake and within Curlew Valley is most likely. The Hansel Valley ash is an example of an ash that has no direct numerical date from proximal deposits, despite considerable study, yet nonetheless is useful for stratigraphic studies by virtue of its known stratigraphic position and approximate age. Basaltic tephras commonly are not as widespread as their rhyolitic counterparts, and in some cases apparently are produced by eruptive sources that are short lived and whose edifices are not persistent. ?? 2007 Elsevier Ltd and INQUA.

  5. 15,000 Years of vegetation change in the Bonneville basin: the Blue Lake pollen record

    NASA Astrophysics Data System (ADS)

    Louderback, Lisbeth A.; Rhode, David E.

    2009-02-01

    This paper contributes to the emerging picture of late Pleistocene and Holocene environmental change in the Bonneville basin, western North America, through analysis of pollen and sediments from the Blue Lake marsh system, a major wetland area located on the western margin of the Great Salt Lake desert. Analyses of data obtained from the upper 4 m of the Blue Lake core suggest that during the latest Pleistocene, when Lake Bonneville covered the Blue Lake site, pine and sagebrush dominated terrestrial plant communities. These steppe-woodland taxa declined in abundance after ˜12 cal ka BP. Wetland plant communities developed at or nearby Blue Lake by ˜11.9 cal ka BP and bulrush-dominated marshes were established no later than 10.8 cal ka BP. The Blue Lake wetlands largely desiccated during a dry and warm early middle Holocene ˜8.3-6.5 cal ka BP. Climatic amelioration starting ˜6.5 cal ka BP is marked principally by a local return of marshes at the expense of playa and grass meadow communities, and a regional increase in sagebrush relative to other dryland shrubs. Singleleaf pinyon pine migrated into the nearby Goshute Mountains after ˜8 cal ka BP. Late Holocene fluctuations include cool intervals from ˜4.4 to 3.4 and ˜2.7 to 1.5 cal ka BP and warmer conditions from 3.4 to 2.7 cal BP and after 1.5 cal ka BP.

  6. Investigation of Salt Loss from the Bonneville Salt Flats, Northwestern Utah

    USGS Publications Warehouse

    Mason, James L.; Kipp, Kenneth L.

    1997-01-01

    The Bonneville Salt Flats study area is located in the western part of the Great Salt Lake Desert in northwestern Utah, about 110 miles west of Salt Lake City. The salt crust covers about 50 square miles, but the extent varies yearly as a result of salt being dissolved by the formation and movement of surface ponds during the winter and redeposited with the evaporation of these ponds during the summer. A decrease in thickness and extent of the salt crust on the Bonneville Salt Flats has been documented during 1960-88 (S. Brooks, Bureau of Land Management, written commun., 1989). Maximum salt-crust thickness was 7 feet in 1960 and 5.5 feet in 1988. No definitive data are available to identify and quantify the processes that cause salt loss. More than 55 million tons of salt are estimated to have been lost from the salt crust during the 28-year period. The Bureau of Land Management needs to know the causes of salt loss to make appropriate management decisions.

  7. Assessment of Fluctuating Reservoir Elevations Using Hydraulic Models and Impacts to Larval Pacific Lamprey Rearing Habitat in the Bonneville Pool

    SciTech Connect

    Mueller, Robert P.; Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.

    2015-02-24

    This report presents the results of a modeling assessment of likely lamprey larval habitat that may be impacted by dewatering of the major tributary delta regions in the Bonneville Pool of the Columbia River. This assessment was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (CENWP). The goal of the study was to provide baseline data about how the regions of interest would potentially be impacted at three river flows (10, 50, and 90 percent exceedance flow) for four different forebay elevations at Bonneville Dam. Impacts of unsteady flows at The Dalles Dam and changing forebay elevation at Bonneville Dam for a 2-week period were also assessed. The area of dewatered regions was calculated by importing modeled data outputs into a GIS and then calculating the change in inundated area near tributary deltas for the four Bonneville forebay surface elevations. From the modeled output we determined that the overall change in area is less sensitive to elevations changes during higher river discharges. Changing the forebay elevation at Bonneville and the resulting impact to total dewatered regions was greater at the lowest modeled river flow (97 kcfs) and showed the greatest variation at the White Salmon/Hood River delta regions followed by the Wind, Klickitat and the Little White Salmon rivers. To understand how inundation might change on a daily and hourly basis. Unsteady flow models were run for a 2-week period in 2002 and compared to 2014. The water surface elevation in the upstream pool closely follows that of the Bonneville Dam forebay with rapid changes of 1 to 2-ft possible. The data shows that 2.5-ft variation in water surface elevation occurred during this period in 2002 and a 3.7-ft change occurred in 2014. The duration of these changes were highly variable and generally did not stay constant for more than a 5-hr period.

  8. 78 FR 18420 - Special Permit Applications Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Pipeline and Hazardous Materials Safety Administration Special Permit Applications Actions AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of actions on special... processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49...

  9. 77 FR 12865 - Enforcement Actions Summary

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Government Printing Office's Web page at http://www.gpo.gov/fdsys/browse/collection.action?collectionCode=FR... SECURITY Transportation Security Administration Enforcement Actions Summary AGENCY: Transportation Security Administration, DHS. ACTION: Notice of availability. SUMMARY: The Transportation Security Administration (TSA)...

  10. 78 FR 11216 - Enforcement Actions Summary

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... Government Printing Office's web page at http://www.gpo.gov/fdsys/browse/collection.action?collectionCode=FR... SECURITY Transportation Security Administration Enforcement Actions Summary AGENCY: Transportation Security Administration, DHS. ACTION: Notice of availability. SUMMARY: The Transportation Security Administration (TSA)...

  11. 40 CFR 66.81 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Final action. 66.81 Section 66.81... COLLECTION OF NONCOMPLIANCE PENALTIES BY EPA Final Action § 66.81 Final action. (a) A final Agency action... State action pursuant to part 67. (b) The actions listed in paragraph (a) of this section...

  12. Evaluation of the Fish Passage Effectiveness of the Bonneville I Prototype Surface Collector using Three-Dimensional Ultrasonic Fish Tracking

    SciTech Connect

    Faber, Derrek M.; Weiland, Mark A.; Moursund, Robert; Carlson, Thomas J.; Adams, Noah; Rhondorf, D.

    2001-05-01

    This report describes tests conducted at Bonneville Dam on the Columbia River in the spring of 2000 using three-dimensional acoustic telemetry and computational fluid dynamics hydraulic modeling to observe the response of outmigrating juvenile steelhead and yearling chinook to a prototype surface collector installed at the Powerhouse. The study described in this report was one of several conducted for the U.S. Army Corps of Engineers to prepare a decision document on which of two bypass methods: surface flow bypass or extended-length submersible bar screens to use to help smolts pass around Bonneville dams without going through the turbines.

  13. Monitoring and Evaluation of the Prototype Surface Collector at Bonneville First Powerhouse in 2000: Synthesis of Results

    SciTech Connect

    Johnson, Gary E.; Carlson, Thomas J.

    2001-06-01

    This report describes research done to evaluate the Prototype Surface Collector at Bonneville Dam, Powerhouse I, on the Columbia River. The surface collector is being evaluated as a means for bringing downstream migrating salmon and steelhead through the powerhouse while avoiding the turbines. The report describes evaluations conducted by PNNL, National Marine Fisheries Service, and various contractors using radio telemetry, hydroacoustics, and computational fluid dynamics models. The evaluation will provide information to the U.S. Army Corps of Engineers for their 2001 decision on whether to use surface flow bypass or extended-length submersible bar screens for long-term smolt passage at Bonneville Dam.

  14. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 2 2012-01-01 2012-01-01 false Agency plan. 720.304 Section 720.304...) AFFIRMATIVE EMPLOYMENT PROGRAMS Disabled Veterans Affirmative Action Program § 720.304 Agency plan. (a) Plan Development. As part of the affirmative action plan it prepares pursuant to section 501(b) of...

  15. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Agency plan. 720.304 Section 720.304...) AFFIRMATIVE EMPLOYMENT PROGRAMS Disabled Veterans Affirmative Action Program § 720.304 Agency plan. (a) Plan Development. As part of the affirmative action plan it prepares pursuant to section 501(b) of...

  16. Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects.

    SciTech Connect

    Rasmussen, Larry; Wright, Patrick

    1990-10-01

    The Habitat Evaluation Procedures (HEP) were used to evaluate pre- and post-construction habitat conditions of the US Army Corps of Engineers Bonneville project in Oregon and Washington. The project directly impacted 20,749 acres of wildlife habitat. Seven evaluation species were selected with losses and gains expressed in Habitat Units (HU's). One HU is equivalent to 1 acre of prime habitat. The evaluation estimated a gain of 2671 HU's of lesser scaup wintering habitat. Losses of 4300 HU's of great blue heron habitat, 2443 HU's of Canada goose habitat, 2767 HU's of spotted sandpiper habitat, 163 HU's of yellow warbler habitat, 1022 HU's black-capped chickadee habitat, and 1622 HU's of mink habitat occurred as a result of the project. This amounts to a total combined loss of 12,317 HU's. 18 refs., 1 fig., 4 tabs.

  17. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  18. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

    SciTech Connect

    Ploskey, Gene R.; Batten, G.; Cushing, Aaron W.; Kim, Jin A.; Johnson, Gary E.; Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.; Carpenter, Scott M.; Deng, Zhiqun; Etherington, D. J.; Fischer, Eric S.; Fu, Tao; Greiner, Michael J.; Hennen, Matthew J.; Martinez, Jayson J.; Mitchell, T. D.; Rayamajhi, Bishes; Zimmerman, Shon A.

    2013-02-15

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  19. Synthesis of Biological Reports on Juvenile Fish Passage and Survival at Bonneville Dam through 2005

    SciTech Connect

    Ploskey, Gene R.; Johnson, Gary E.; Giorgi, Albert E.; Johnson, Richard L.; Stevenson, John R.; Schilt, Carl R.; Johnson, Peter N.; Patterson, Deborah S.

    2005-06-01

    This report describes a review of available literature on juvenile salmonid passage at Bonneville Dam from 1939 through 2005. Studies of interest included project-wide fish-passage efficiency (FPE) studies by radio telemetry and fixed-aspect hydroacoustics, fish survival studies (direct and indirect), FGE studies, powerhouse and unit (by netting, hydroacoustics, and radio telemetry), predation studies in the forebay and tailrace, behavioral studies on forebay approach and egress, and surface-bypass studies. The FPE effort will include a review of available distribution data (horizontal, diel, and vertical) for juvenile salmon. This study does not repeat the results of previous review and synthesis studies but cites them. Where no previous review exists for a subject area, all reports were reviewed and synthesized. The report includes an annotated bibliography summarizing each of the documents reviewed and a DVD disk containing all of the original papers and reports along with an HTML index to the documents.

  20. Lacustrine cave carbonates: Novel archives of paleohydrologic change in the Bonneville Basin (Utah, USA)

    NASA Astrophysics Data System (ADS)

    McGee, David; Quade, Jay; Edwards, R. Lawrence; Broecker, Wallace S.; Cheng, Hai; Reiners, Peter W.; Evenson, Nathan

    2012-10-01

    Records of past changes in lake levels and lake water isotopic composition in closed basins provide key insights into past variations in the hydrological cycle; however, these records are often limited by dating precision and temporal resolution. Here we present data from lacustrine cave carbonates, a previously unexplored class of carbonates that comprise a promising new archive of past hydrologic changes in the Bonneville Basin of the northeastern Great Basin (USA). These dense carbonates precipitated within caves, crevices, and other protected spaces flooded by Lake Bonneville during its highstand in the last glacial period. We report on deposits in Cathedral and Craners caves, located ˜50 km apart at similar elevations approximately 100 m above the modern Great Salt Lake and almost 200 m below Lake Bonneville's highstand shoreline. Carbonates from the two caves show similar chronologies, mineralogical transitions, isotopic compositions, and uranium concentrations. These findings suggest that lacustrine cave carbonates record changes in lake level and in the isotopic composition and chemistry of lake water. Importantly, the deposits can be precisely dated by U-Th methods, providing the first records of Lake Bonneville's water balance changes tied to precise U-Th ages. Close agreement between paired U-Th and calibrated 14C ages in the deposits suggests a minimal (<200 a) carbon reservoir effect in the lake and allows 14C dating to be used for age control in portions of the deposits less suitable for U-Th dating. We use ages for the onset and cessation of lacustrine cave carbonate deposition to offer new constraints on past changes in lake level and the carbonate saturation state of lake water. We also present precisely dated, high-resolution oxygen and uranium isotope records from the deposits. Within a first phase of deposition reflecting the lake's transgression between 26 and 18 ka, our isotopic data suggest a large influx of freshwater during Heinrich

  1. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

    2012-09-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  2. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010

    SciTech Connect

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

    2011-12-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  3. Fish remains from Homestead Cave and lake levels of the past 13,000 years in the Bonneville basin

    USGS Publications Warehouse

    Broughton, J.M.; Madsen, D.B.; Quade, Jay

    2000-01-01

    A late Quaternary ichthyofauna from Homestead Cave, Utah, provides a new source of information on lake history in the Bonneville basin. The fish, represented by 11 freshwater species, were accumulated between ~11,200 and ~1000 14C yr B.P. by scavenging owls. The 87Sr/86Sr ratio of Lake Bonneville varied with its elevation; 87Sr/86Sr values of fish from the lowest stratum of the cave suggest they grew in a lake near the terminal Pleistocene Gilbert shoreline. In the lowest deposits, a decrease in fish size and an increase in species tolerant of higher salinities or temperatures suggest multiple die-offs associated with declining lake levels. An initial, catastrophic, post-Provo die-off occurred at 11,300-11,200 14C yr B.P. and was followed by at least one rebound or recolonization of fish populations, but fish were gone from Lake Bonneville sometime before ~10,400 14C yr B.P. This evidence is inconsistent with previous inferences of a near desiccation of Lake Bonneville between 13,000 and 12,000 14C yr B.P. Peaks in Gila atraria frequencies in the upper strata suggest the Great Salt Lake had highstands at ~3400 and ~1000 14C yr B.P. (C) 2000 University of Washington.

  4. Fort Lewis, Yakima Firing Center, and Vancouver Barracks/Camp Bonneville basewide energy use plan; executive summary. Final report

    SciTech Connect

    Smiley, D.P.

    1984-03-01

    This Executive Summary presents an overview of a series of studies, mostly energy related, of Fort Lewis, Yakima Firing Center, Vancouver Barracks, and Camp Bonneville. Collectively, the work is known as the Basewide Energy Use Plan and is a part of the Energy Conservation Investment Program (ECIP).

  5. Idaho Model Watershed Project : Annual Report to the Bonneville Power Administration January 1, 1997 - December 31, 1997.

    SciTech Connect

    Bradbury, Allen; Slavin, Katie

    1998-10-28

    The Model Watershed Project was initiated in the fall of 1992 with a grant from Bonneville Power Administration. The objective of this project is to protect, enhance and restore anadromous and resident fish habitat and achieve and maintain a balance between resource protection and resource use on a holistic watershed basis.

  6. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    SciTech Connect

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-07

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  7. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    SciTech Connect

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-03-01

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  8. Hydroacoustic Evaluation of Fish-Passage Efficiency at Bonneville Dam in 2001

    SciTech Connect

    Ploskey, Gene R.; Schilt, Carl R.; Hanks, Michael E.; Johnson, Peter N.; Kim, Jina; Skalski, John R.; Patterson, Deborah S.; Nagy, William T.; Lawrence, Larry R.

    2002-10-11

    The Portland District of the U.S. Army Corps of Engineers requested that scientists with the Pacific Northwest National Laboratory (PNNL) and the U.S. Army Engineer Research and Development Center (ERDC) conduct the hydroacoustic fish-passage studies described in this report. The ERDC also contracted with MEVATEC Corporation and Dyntel to provide staff ranging from scientists to technicians for the study. This study supports the Portland-District goal of maximizing fish passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing the Bonneville Project. This report presents results of two hydroacoustic studies of juvenile salmonids. One was a Project-wide study of fish-passage efficiency, and the other was more narrowly focused upon the approach, vertical distribution, and fish-guidance efficiency (FGE) of fish at Unit 15, where the Portland District extensively modified the gatewell and vertical barrier screen to improve gatewell flow and FGE. The goal of the larger of the two studies was to provide project-wide estimates of FPE, spill efficiency, and spill effectiveness for run-of-river fish passing the Bonneville Project during the 2001 out-migration. This type of study also provides estimates of the horizontal, vertical, and diel distributions of fish passage and FGE by turbine unit. These data will provide a baseline for evaluating the performance of future management efforts to improve juvenile fish passage. The goal of the second study was to assess the effect of gatewell and vertical-barrier-screen modifications on the FGE of Unit 15.

  9. Age and paleoclimatic significance of the Stansbury shoreline of Lake Bonneville, Northeastern Great Basin

    USGS Publications Warehouse

    Oviatt, Charles G.; Currey, D.R.; Miller, D.M.

    1990-01-01

    The Stansbury shoreline, one of the conspicuous late Pleistocene shorelines of Lake Bonneville, consists of tufa-cemented gravel and barrier beaches within a vertical zone of about 45 m, the lower limit of which is 70 m above the modern average level of Great Salt Lake. Stratigraphic evidence at a number of localities, including new evidence from Crater Island on the west side of the Great Salt Lake Desert, shows that the Stansbury shoreline formed during the transgressive phase of late Pleistocene Lake bonneville (sometime between about 22,000 and 20,000 yr B.P.). Tufa-cemented gravel and barrier beaches were deposited in the Stansbury shorezone during one or more fluctuations in water level with a maximum total amplitude of 45 m. We refer to the fluctuations as the Stansbury oscillation. The Stansbury oscillation cannot have been caused by basin-hypsometric factors, such as stabilization of lake level at an external overflow threshold or by expansion into an interior subbasin, or by changes in drainage basin size. Therefore, changes in climate must have caused the lake level to reverse its general rise, to drop about 45 m in altitude (reducing its surface area by about 18%, 5000 km2), and later to resume its rise. If the sizes of Great Basin lakes are controlled by the mean position of storm tracks and the jetstream, which as recently postulated may be controlled by the size of the continental ice sheets, the Stansbury oscillation may have been caused by a shift in the jetstream during a major interstade of the Laurentide ice sheet. ?? 1990.

  10. Evaluation of Wasatch fault segmentation and slip rates using Lake Bonneville shorelines

    NASA Astrophysics Data System (ADS)

    Jewell, Paul W.; Bruhn, Ronald L.

    2013-05-01

    ABSTRACT Analysis of Lake Bonneville shorelines using lidar digital elevation data challenges accepted models of Wasatch fault deformation since the late Pleistocene. While footwall deformation of the Weber segment of the Wasatch fault is consistent with back-rotation of the footwall block and greatest displacement rate toward the center of the segment, shorelines along the footwall of the Salt Lake City segment decrease in elevation toward the interior and are highest at the segment boundaries, an opposite pattern of footwall deformation than predicted for boundaries arresting or strongly inhibiting displacement during earthquakes. The spatial pattern of footwall rebound implies that some of the proposed persistent fault segment boundaries do not stop earthquake ruptures that originate on adjacent fault segments, nor constrain ruptures initiated within the Salt Lake City segment. Net vertical fault displacement at the boundary between the Salt Lake and Provo segments is 16-20 m over the past 16.3-18.5 ka, corresponding to a vertical displacement rate of 0.8-1.2 mm/yr, a net fault slip rate of 2.0-2.8 mm/yr, and horizontal extension rate of 1.8-2.6 mm/yr on the 25° west-southwest dipping fault that forms the southern Salt Lake City segment boundary. Shoreline analysis suggests isostatic rebound caused by a drop in lake level was concentrated during a relatively short (~2000 year) time period following the Bonneville flood at ~16 ka. Lidar-derived topography in conjunction with robust geomorphic datums improves our ability to map deformation associated with lithospheric flexure and faulting while demonstrating the limitation of lacustrine shorelines in this type of analysis.

  11. Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam

    SciTech Connect

    Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

    2009-01-29

    At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

  12. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... year. (d) Plan Certification. Each agency must certify to OPM by December 1 of each year that it has an... 5 Administrative Personnel 2 2013-01-01 2013-01-01 false Agency plan. 720.304 Section 720.304...) AFFIRMATIVE EMPLOYMENT PROGRAMS Disabled Veterans Affirmative Action Program § 720.304 Agency plan. (a)...

  13. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... year. (d) Plan Certification. Each agency must certify to OPM by December 1 of each year that it has an... 5 Administrative Personnel 2 2014-01-01 2014-01-01 false Agency plan. 720.304 Section 720.304...) AFFIRMATIVE EMPLOYMENT PROGRAMS Disabled Veterans Affirmative Action Program § 720.304 Agency plan. (a)...

  14. 77 FR 19275 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy, DoE. ACTION: Notice and Request... of information that DOE is developing for submission to the Office of Management and Budget (OMB... collection of information is necessary for the proper performance of the functions of the agency,...

  15. 76 FR 62395 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-07

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for... Management and Budget (OMB) to extend for three years the emergency Information Collection Request Title: OE... of information is necessary for the proper performance of the functions of the agency,...

  16. 76 FR 69251 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... Proposed Agency Information Collection AGENCY: U.S. Department of Energy (DOE). ACTION: Notice and request... of information that DOE is developing for submission to the Office of Management and Budget (OMB... collection of information is necessary for the proper performance of the functions of the agency,...

  17. 77 FR 57080 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-17

    ... Information Administration Proposed Agency Information Collection AGENCY: U.S. Energy Information Administration (EIA), U.S. Department of Energy. ACTION: Agency Information Collection Activities: Proposed... 1995. Comments are invited on: (a) Whether the proposed collection of information is necessary for...

  18. 75 FR 22578 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... to the general public via the Joint Department of Energy and Environmental Protection Agency Web site... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and request...

  19. 75 FR 5304 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    ... the joint Department of Energy and Environmental Protection Web site, http://www.fueleconomy.gov ; (5... Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for... is necessary for the proper performance of the functions of the agency, including whether...

  20. 77 FR 69613 - International Energy Agency Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meeting AGENCY: Department of Energy. ACTION: Notice of meeting. SUMMARY: A meeting involving members of the Industry Advisory Board (IAB) to the International Energy Agency (IEA)...

  1. 78 FR 16665 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on March 25 and 26,...

  2. 77 FR 16826 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy, DoE. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on March 28 and 29,...

  3. 75 FR 67711 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on November 16, 2010,...

  4. 75 FR 34724 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of Meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on June 29, 2010, at...

  5. 76 FR 35869 - International Energy Agency meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency meetings AGENCY: Department of Energy, DOE. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on June 28, 2011, at...

  6. 75 FR 12532 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on March 23, 2010, at...

  7. 78 FR 36542 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on June 24, 2013, at...

  8. 76 FR 69714 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of Meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on November 16-17,...

  9. 77 FR 36271 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on June 26, 2012, at...

  10. 76 FR 14003 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on March 22, 2011, at...

  11. 77 FR 61583 - International Energy Agency Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY International Energy Agency Meetings AGENCY: Department of Energy. ACTION: Notice of meetings. SUMMARY: The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on October 17 and 18,...

  12. 77 FR 21574 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, FEMA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB...: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted below to the Office of Management and...

  13. 78 FR 69100 - Agency Information Collection Activities: Proposed Collection; Comment Request; Request for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Proposed Collection; Comment Request; Request for Federal Assistance Form--How To Process Mission Assignments in Federal Disaster Operations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The...

  14. 75 FR 52770 - Agency Information Collection Activities: Proposed Collection; Comment Request, 1660-0047...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Proposed Collection; Comment Request, 1660-0047; Request for Federal Assistance Form--How To Process Mission Assignments in Federal Disaster Operations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice;...

  15. 75 FR 32199 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-07

    ... Federal Emergency Management Agency (FEMA) has submitted the information collection abstracted below to... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB... Emergency Management Agency, DHS. ACTION: Notice; 30-day notice and request for comments; extension,...

  16. 77 FR 8273 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB Review; Comment Request, National Flood Insurance Program-Mortgage Portfolio Protection Program AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: The Federal Emergency Management...

  17. 77 FR 8272 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, PrepCAST.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... the State, Local and Tribal jurisdiction level. It also collects National Incident Management System... SECURITY Federal Emergency Management Agency Agency Information Collection Activities: Submission for OMB Review; Comment Request, PrepCAST. AGENCY: Federal Emergency Management Agency, DHS. ACTION:...

  18. 78 FR 42071 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance... the public comment period for the proposed guidance ``PAG Manual: Protective Action Guides (PAGs)...

  19. 40 CFR 6.404 - Lead or cooperating agency.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Lead or cooperating agency. 6.404 Section 6.404 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL PROCEDURES FOR... ACTIONS Assessing the Environmental Effects Abroad of EPA Actions § 6.404 Lead or cooperating agency....

  20. 40 CFR 6.404 - Lead or cooperating agency.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Lead or cooperating agency. 6.404 Section 6.404 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL PROCEDURES FOR... ACTIONS Assessing the Environmental Effects Abroad of EPA Actions § 6.404 Lead or cooperating agency....