Science.gov

Sample records for action contractor building

  1. Building America Expert Meeting Report. Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    SciTech Connect

    Burdick, Arlan

    2011-10-01

    This expert meeting was hosted by the IBACOS Building America research team to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting.

  2. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 3 2014-07-01 2014-07-01 false Farm labor contractor is responsible for actions of his farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in...

  3. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 3 2012-07-01 2012-07-01 false Farm labor contractor is responsible for actions of his farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in...

  4. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 3 2013-07-01 2013-07-01 false Farm labor contractor is responsible for actions of his farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in...

  5. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 3 2011-07-01 2011-07-01 false Farm labor contractor is responsible for actions of his farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in...

  6. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Farm labor contractor is responsible for actions of his farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in...

  7. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    SciTech Connect

    Burdick, A.

    2011-10-01

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational profile of an

  8. 10 CFR 707.17 - Permissible actions in the event of contractor noncompliance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Permissible actions in the event of contractor noncompliance. 707.17 Section 707.17 Energy DEPARTMENT OF ENERGY WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES Procedures § 707.17 Permissible actions in the event of contractor noncompliance. Actions available to DOE...

  9. 10 CFR 707.17 - Permissible actions in the event of contractor noncompliance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Permissible actions in the event of contractor noncompliance. 707.17 Section 707.17 Energy DEPARTMENT OF ENERGY WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES Procedures § 707.17 Permissible actions in the event of contractor noncompliance. Actions available to DOE...

  10. 10 CFR 707.17 - Permissible actions in the event of contractor noncompliance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Permissible actions in the event of contractor noncompliance. 707.17 Section 707.17 Energy DEPARTMENT OF ENERGY WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES Procedures § 707.17 Permissible actions in the event of contractor noncompliance. Actions available to DOE...

  11. 10 CFR 707.17 - Permissible actions in the event of contractor noncompliance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Permissible actions in the event of contractor noncompliance. 707.17 Section 707.17 Energy DEPARTMENT OF ENERGY WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES Procedures § 707.17 Permissible actions in the event of contractor noncompliance. Actions available to DOE...

  12. 10 CFR 707.17 - Permissible actions in the event of contractor noncompliance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Permissible actions in the event of contractor noncompliance. 707.17 Section 707.17 Energy DEPARTMENT OF ENERGY WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES Procedures § 707.17 Permissible actions in the event of contractor noncompliance. Actions available to DOE...

  13. 28 CFR 115.177 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Corrective action for contractors and volunteers. 115.177 Section 115.177 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Lockups Discipline § 115.177 Corrective action...

  14. 28 CFR 115.177 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Corrective action for contractors and volunteers. 115.177 Section 115.177 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Lockups Discipline § 115.177 Corrective action...

  15. 28 CFR 115.177 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Corrective action for contractors and volunteers. 115.177 Section 115.177 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Lockups Discipline § 115.177 Corrective action...

  16. 28 CFR 115.77 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Corrective action for contractors and volunteers. 115.77 Section 115.77 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Adult Prisons and Jails Discipline § 115.77 Corrective...

  17. 28 CFR 115.77 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Corrective action for contractors and volunteers. 115.77 Section 115.77 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Adult Prisons and Jails Discipline § 115.77 Corrective...

  18. 28 CFR 115.77 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Corrective action for contractors and volunteers. 115.77 Section 115.77 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Adult Prisons and Jails Discipline § 115.77 Corrective...

  19. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Corrective action for contractors and volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Community Confinement Facilities Discipline §...

  20. 28 CFR 115.377 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Corrective action for contractors and volunteers. 115.377 Section 115.377 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Juvenile Facilities Discipline § 115.377 Corrective...

  1. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Corrective action for contractors and volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Community Confinement Facilities Discipline §...

  2. 28 CFR 115.377 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Corrective action for contractors and volunteers. 115.377 Section 115.377 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Juvenile Facilities Discipline § 115.377 Corrective...

  3. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Corrective action for contractors and volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Community Confinement Facilities Discipline §...

  4. 28 CFR 115.377 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Corrective action for contractors and volunteers. 115.377 Section 115.377 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Juvenile Facilities Discipline § 115.377 Corrective...

  5. Building Air Quality. Action Plan.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Indoor Air Div.

    Building managers and owners often confront competing demands to reduce operating costs and increase revenues that can siphon funds and resources from other building management concerns such as indoor air quality (IAQ). This resource booklet, designed for use with the "Building Air Quality Guide," provides building owners and managers with an…

  6. Smart Buildings: Business Case and Action Plan

    SciTech Connect

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  7. Nine Actions to Build Students' Mathematics Abilities

    ERIC Educational Resources Information Center

    Barger, Kenna

    2010-01-01

    The author was asked to develop a list of actions that teachers could take to build students' mathematics abilities. Too many students fail to graduate and fail to pass state assessments as a result of weak mathematics skills. Even many students who do graduate leave high school lacking sufficient understanding of mathematics to pass college…

  8. Energy Management in Small Commercial Buildings: A Look at How HVAC Contractors Can Deliver Energy Efficiency to this Segment

    SciTech Connect

    Hult, Erin; Granderson, Jessica; Mathew, Paul

    2014-07-01

    While buildings smaller than 50,000 sq ft account for nearly half of the energy used in US commercial buildings, energy efficiency programs to-date have primarily focused on larger buildings. Interviews with stakeholders and a review of the literature indicate interest in energy efficiency from the small commercial building sector, provided solutions are simple and low-cost. An approach to deliver energy management to small commercial buildings via HVAC contractors and preliminary demonstration findings are presented. The energy management package (EMP) developed includes five technical elements: benchmarking and analysis of monthly energy use; analysis of interval electricity data (if available), a one-hour onsite walkthrough, communication with the building owner, and checking of results. This data-driven approach tracks performance and identifies low-cost opportunities, using guidelines and worksheets for each element to streamline the delivery process and minimize the formal training required. This energy management approach is unique from, but often complementary to conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Because HVAC contractors already serve these clients, the transaction cost to market and deliver energy management services can be reduced to the order of hundreds of dollars per year. This business model, outlined briefly in this report, enables the offering to benefit the contractor and client even at the modest expected energy savings in small buildings. Results from a small-scale pilot of this approach validated that the EMP could be delivered by contractors in 4-8 hours per building per year, and that energy savings of 3-5percent are feasible through this approach.

  9. [Communicative action for building nursing knowledge].

    PubMed

    do Nascimento, Suzana Rodrigues; do Prado, Marta Lenise

    2004-01-01

    It is a theoretical essay aiming at proposing the usage of the communicative action theory, by philosopher Jürger Habermas, as a mediator of educational technologies in building nursing knowledge. Based on the contributions by the philosopher and authors such as Demo, Morin, Assman, Perrenoud, Waldow, and Ramos, we reflect on technological advances and the necessary innovations in the field of nursing education. We believe that this proposal can contribute to implementing the national curriculum guidelines in undergraduate courses. PMID:15535528

  10. 78 FR 58613 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... reduce the time and cost burden on contractors. The specific revisions made, and the rationale for making... Authority Initially enacted into law in 1974 and amended several times in the intervening years, the purpose... their success in recruiting and employing veterans by requiring, for the first time, that...

  11. Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

    SciTech Connect

    Barber, Brenda; Honerlah, Hans; O'Neill, Mike; Young, Carl

    2012-07-01

    : coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)

  12. 76 FR 36482 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ... regulations implementing the affirmative action provisions of the Vietnam Era Veterans' Readjustment... April 26, 2011 (76 FR 23358), scheduled to close on June 27, 2011, is extended until July 11, 2011..., 2011, OFCCP published a proposed rule entitled ``Affirmative Action and Nondiscrimination...

  13. 75 FR 43116 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ...The Office of Federal Contract Compliance Programs (OFCCP) is issuing this Advance Notice of Proposed Rulemaking (ANPRM) in order to invite the public to provide input on how OFCCP can strengthen the affirmative action requirements of the regulations implementing section 503 of the Rehabilitation Act of 1973, as amended (Section 503). Strengthening affirmative action requirements will help......

  14. 77 FR 7108 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... of Federal Contract Compliance Programs 41 CFR Part 60-741 RIN 1250-AA02 Affirmative Action and... Programs (OFCCP) published a Federal Register notice of proposed rulemaking (NPRM). This NPRM (76 FR 77056) proposes revising the regulations implementing the nondiscrimination and affirmative action regulations...

  15. Building air quality: Action plan, June 1998

    SciTech Connect

    1998-11-01

    To promote the use of these straightforward practices to improve IAQ, EPA and other leaders in the IAQ field developed this 8-step plan. This additional resource meets the needs of building owners and managers who want an easy-to-understand path for taking their building from current conditions and practices to the successful institutionalization of good IAQ management practices.

  16. Lessons in Community Building: From Dialogue to Action.

    ERIC Educational Resources Information Center

    Beck, Barbra; Maurana, Cheryl A.; Newton, Gail

    2002-01-01

    Describes Neighbors Helping Neighbors: Turning Ideas into Action, a two-part program involving the Medical College of Wisconsin that facilitates the community-building process for low-income public housing residents in Milwaukee. (EV)

  17. Solicitation and Selection of Partner Projects, Technical Team Leads, and Measurement and Validation Contractors for the American Recovery and Reinvestment Act (ARRA) Funded Commercial Building Partnerships (CBP-2)

    SciTech Connect

    Nesse, Ronald J.; Baechler, Michael C.; Iverson, Megan M.

    2010-09-30

    In March 2010, Pacific Northwest National Laboratory (PNNL) joined two other labs receiving ARRA funding, Lawrence Berkeley National Laboratory (LBNL) and the National Renewable National Laboratory (NREL), to began weekly conference calls with the goal of coordinating a joint lab solicitation to support the ARRA-funded CBP project. Two solicitations were identified for: 1) new CBP Partners; 2) technical contractors to provide technical assistance and measurement and verification (M&V) contractors. The M&V contractors support the work by providing model reviews and conducting monitoring studies to verify building performance. This report documents the process used by the labs for the solicitations, and describes the process and outcomes for PNNL, selection of candidate Partners, technical teams, and M&V contractors.

  18. Building Civic Bridges: Community-Centered Action Civics

    ERIC Educational Resources Information Center

    LeCompte, Karon; Blevins, Brooke

    2015-01-01

    Project-based learning is an example of powerful social studies learning in which student engage in active inquiry. Action civics is a relatively new educational practice in which students "act as citizens" through a cycle of research, action, and reflection about problems they care about in their community. "Building Civic…

  19. Building Capacity through Action Research Curricula Reviews

    ERIC Educational Resources Information Center

    Lee, Vanessa; Coombe, Leanne; Robinson, Priscilla

    2015-01-01

    In Australia, graduates of Master of Public Health (MPH) programmes are expected to achieve a set of core competencies, including a subset that is specifically related to Indigenous health. This paper reports on the methods utilised in a project which was designed using action research to strengthen Indigenous public health curricula within MPH…

  20. 41 CFR 301-70.708 - What actions may we take if an employee misuses the Government contractor-issued travel charge...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 4 2012-07-01 2012-07-01 false What actions may we take if an employee misuses the Government contractor-issued travel charge card while on official travel? 301-70.708 Section 301-70.708 Public Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL...

  1. Building America Best Practices Series Volume 14 - HVAC. A Guide for Contractors to Share with Homeowners

    SciTech Connect

    Baechler, Michael C.; Gilbride, Theresa L.; Hefty, Marye G.; Hand, James R.; Love, Pat M.

    2011-08-01

    This guide, which is part of a series of Best Practices guides produced by DOE’s Building America program, describes ways homeowners can reduce their energy costs and improve the comfort, health, and safety of their homes by upgrading their heating, ventilation, and air conditioning (HVAC) equipment.

  2. Building a Radiology Service Line: Key Elements and Necessary Actions.

    PubMed

    Hawkins, C Matthew

    2016-01-01

    Building a radiology service line is a challenge. Beyond the science of imaging and pathophysiology of disease, there are a number of key elements and necessary actions-related to personnel, communication, and resources-that must be taken to make the service line successful and sustainable. Although there is no single best way to build an imaging-based service line, there are a number of essential components. The purpose of this article is to delineate these components and describe how ambitious radiologists may successfully build and sustain a radiology service line. PMID:26476845

  3. Building America Best Practices Series. Volume 17 - Energy Renovations-Insulation: A Guide for Contractors to Share With Homeowners

    SciTech Connect

    Baechler, Michael C.; Adams, K. T.; Hefty, M. G.; Gilbride, T. L.; Love, Pat M.

    2012-05-01

    This guide will help contractors and homeowners identify ways to make their homes more comfortable, more energy efficient, and healthier to live in. It also identifies the steps to take, with the help of a qualified home performance contractor, to increase their home’s insulation, ensure healthy levels of ventilation, and prevent moisture problems. Contractors can use this document to explain the value of these insulation measures to their customers. The references in this document provide further explanation of insulation techniques and technologies.

  4. Utility of action checklists as a consensus building tool.

    PubMed

    Kim, Yeon-Ha; Yoshikawa, Etsuko; Yoshikawa, Toru; Kogi, Kazutaka; Jung, Moon-Hee

    2015-01-01

    The present study's objective was to determine the mechanisms for enhancing the utility of action checklists applied in participatory approach programs for workplace improvements, to identify the benefits of building consensus and to compare their applicability in Asian countries to find the most appropriate configuration for action checklists. Data were collected from eight trainees and 43 trainers with experience in Participatory Action-Oriented Training. Statistical analysis was performed in SPSS using the package PASW, version 19.0. The difference in the mean score for the degree of the utility of action checklists between countries was analyzed using ANOVA methods. Factor analysis was performed to validate the action checklists' utility. Pearson Correlation Coefficients were then calculated to determine the direction and strength of the relationship between these factors. Using responses obtained from trainees' in-depth interviews, we identified 33 key statements that were then classified into 11 thematic clusters. Five factors were extracted, namely "ease of application", "practical solutions", "group interaction", "multifaceted perspective" and "active involvement". The action checklist was useful for facilitating a participatory process among trainees and trainers for improving working conditions. Action checklists showed similar patterns of utility in various Asian countries; particularly when adjusted to local conditions. PMID:25224334

  5. Utility of action checklists as a consensus building tool

    PubMed Central

    KIM, Yeon-Ha; YOSHIKAWA, Etsuko; YOSHIKAWA, Toru; KOGI, Kazutaka; JUNG, Moon-Hee

    2014-01-01

    The present study’s objective was to determine the mechanisms for enhancing the utility of action checklists applied in participatory approach programs for workplace improvements, to identify the benefits of building consensus and to compare their applicability in Asian countries to find the most appropriate configuration for action checklists. Data were collected from eight trainees and 43 trainers with experience in Participatory Action-Oriented Training. Statistical analysis was performed in SPSS using the package PASW, version 19.0. The difference in the mean score for the degree of the utility of action checklists between countries was analyzed using ANOVA methods. Factor analysis was performed to validate the action checklists’ utility. Pearson Correlation Coefficients were then calculated to determine the direction and strength of the relationship between these factors. Using responses obtained from trainees’ in-depth interviews, we identified 33 key statements that were then classified into 11 thematic clusters. Five factors were extracted, namely “ease of application”, “practical solutions”, “group interaction”, “multifaceted perspective” and “active involvement”. The action checklist was useful for facilitating a participatory process among trainees and trainers for improving working conditions. Action checklists showed similar patterns of utility in various Asian countries; particularly when adjusted to local conditions. PMID:25224334

  6. Self-benchmarking Guide for Laboratory Buildings: Metrics, Benchmarks, Actions

    SciTech Connect

    Mathew, Paul; Greenberg, Steve; Sartor, Dale

    2009-07-13

    This guide describes energy efficiency metrics and benchmarks that can be used to track the performance of and identify potential opportunities to reduce energy use in laboratory buildings. This guide is primarily intended for personnel who have responsibility for managing energy use in existing laboratory facilities - including facilities managers, energy managers, and their engineering consultants. Additionally, laboratory planners and designers may also use the metrics and benchmarks described in this guide for goal-setting in new construction or major renovation. This guide provides the following information: (1) A step-by-step outline of the benchmarking process. (2) A set of performance metrics for the whole building as well as individual systems. For each metric, the guide provides a definition, performance benchmarks, and potential actions that can be inferred from evaluating this metric. (3) A list and descriptions of the data required for computing the metrics. This guide is complemented by spreadsheet templates for data collection and for computing the benchmarking metrics. This guide builds on prior research supported by the national Laboratories for the 21st Century (Labs21) program, supported by the U.S. Department of Energy and the U.S. Environmental Protection Agency. Much of the benchmarking data are drawn from the Labs21 benchmarking database and technical guides. Additional benchmark data were obtained from engineering experts including laboratory designers and energy managers.

  7. Record of Technical Change {number_sign}1 for ''Corrective Action Investigation Plan for Corrective Action Unit 406: Area 3 Building 03-74 and Building 03-58 Underground Discharge Points and Corrective Action Unit 429: Area 3 Building 03-55 and Area 9 Building 09-52 Underground Discharge Points, Tonopah Test Range, Nevada'' Revision 0

    SciTech Connect

    US DOE Nevada Operations Office

    1999-06-30

    This Record of Technical Change provides updates to the technical information included in ''Corrective Action Investigation Plan for Corrective Action Unit 406: Area 3 Building 03-74 and Building 03-58 Underground Discharge Points and Corrective Action Unit 429: Area 3 Building 03-55 and Area 9 Building 09-52 Underground Discharge Points, Tonopah Test Range, Nevada'' Revision 0

  8. Contractor Relationships.

    ERIC Educational Resources Information Center

    Miller, Anthony R.

    1989-01-01

    It is an advantage to a school system to contract for its school bus service. Financially, private companies can obtain capital easier than can public agencies. A school system that uses good management and monitors the contractor with clear specifications can be assured of safety and efficiency. (MLF)

  9. Corrective Action Investigation plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfield, Nevada Test Site, Nevada, March 1999

    SciTech Connect

    ITLV

    1999-03-01

    The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

  10. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    SciTech Connect

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  11. Building Action Research Teams: A Case of Struggles and Successes

    ERIC Educational Resources Information Center

    Du, Fengning

    2009-01-01

    Teaching teams can hold the promise of being an ideal vehicle in which collaborative action research is conducted. This case documents the mixed results of a team leader's efforts to improve teaching and introduce inquiry-based professional development through action research in a community college. This case paints a realistic and…

  12. Corrective Action Decision Document, Area 15 Environmental Protection Agency Farm Laboratory Building, Corrective Action Unit No. 95, Revision 0

    SciTech Connect

    1997-08-18

    This report is the Corrective Action Decision Document (CADD) for the Nevada Test Site (NTS) Area 15 U.S. Environmental Protection Agency (EPA) Farm, Laboratory Building (Corrective Action Unit [CAU] No. 95), at the Nevada Test Site, Nye County, Nevada. The scope of this CADD is to identify and evaluate potential corrective action alternatives for the decommissioning and decontamination (D and D) of the Laboratory Building, which were selected based on the results of investigative activities. Based on this evaluation, a preferred corrective action alternative is recommended. Studies were conducted at the EPA Farm from 1963 to 1981 to determine the animal intake and retention of radionuclides. The main building, the Laboratory Building, has approximately 370 square meters (4,000 square feet) of operational space. Other CAUS at the EPA Farm facility that will be investigated and/or remediated through other environmental restoration subprojects are not included in this CADD, with the exception of housekeeping sites. Associated structures that do not require classification as CAUS are considered in the evaluation of corrective action alternatives for CAU 95.

  13. N400 ERPs for actions: building meaning in context

    PubMed Central

    Amoruso, Lucía; Gelormini, Carlos; Aboitiz, Francisco; Alvarez González, Miguel; Manes, Facundo; Cardona, Juan F.; Ibanez, Agustín

    2013-01-01

    Converging neuroscientific evidence suggests the existence of close links between language and sensorimotor cognition. Accordingly, during the comprehension of meaningful actions, our brain would recruit semantic-related operations similar to those associated with the processing of language information. Consistent with this view, electrophysiological findings show that the N400 component, traditionally linked to the semantic processing of linguistic material, can also be elicited by action-related material. This review outlines recent data from N400 studies that examine the understanding of action events. We focus on three specific domains, including everyday action comprehension, co-speech gesture integration, and the semantics involved in motor planning and execution. Based on the reviewed findings, we suggest that both negativities (the N400 and the action-N400) reflect a common neurocognitive mechanism involved in the construction of meaning through the expectancies created by previous experiences and current contextual information. To shed light on how this process is instantiated in the brain, a testable contextual fronto-temporo-parietal model is proposed. PMID:23459873

  14. Building a Model PE Curriculum: Education Reform in Action

    ERIC Educational Resources Information Center

    Moore, John

    2012-01-01

    The blueprint to build a model physical education (PE) curriculum begins by establishing a sound curricular foundation based on a lesson plan template that incorporates clear and concise program goals, the alignment of lessons to state or national content standards, and the collection, analysis and use of objective assessment data that informs…

  15. Building Better Futures: Leveraging Action Learning at Kentz Engineers & Constructors

    ERIC Educational Resources Information Center

    Karallis, Takis; Sandelands, Eric

    2011-01-01

    This article provides a case study of how Kentz Engineers & Constructors, with more than 10,000 employees in 26 countries, are leveraging learning to "Build better futures" for its stakeholders: clients, shareholders, employees and communities. Kentz provide opportunities for learning at all levels, ensuring that "no one is left behind". This case…

  16. Building Social Capital for Educational Action Research: The Contribution of Bridget Somekh

    ERIC Educational Resources Information Center

    Elliott, John

    2010-01-01

    The article will review some of Bridget Somekh's action research projects as attempts to build networks of trust and reciprocity across a range of educational stake-holders. It will also examine Bridget's wider role within the education action research movement as a whole, looking at her achievements as a facilitator of networks of action…

  17. Building Community Linkages: Some Thoughts on Community Based Action Research.

    ERIC Educational Resources Information Center

    Mora, Juana

    An original goal of Chicano Studies was to promote improvement of social and economic conditions in the community, with Chicana and Chicano scholars at the forefront of community struggles. Within this perspective, research is problem-based and part of the community action process. Chicano community groups want to work with researchers and…

  18. Building Nuclear Communities: The Hanford Education Action League.

    ERIC Educational Resources Information Center

    Ratliff, Jeanne; Salvador, Michael

    Many scholars have examined the jeremiad in American rhetoric and political discourse. The Hanford Education Action League (HEAL), which influenced policy changes in the operations of the Hanford Nuclear Reservation in Washington, is a social movement organization whose founding members used the jeremiad to create a symbolic community which…

  19. Making Capacity Building Meaningful: A Framework for Strategic Action

    NASA Astrophysics Data System (ADS)

    Robins, Lisa

    2008-11-01

    This paper aims to give practical meaning to ‘capacity building’ through (a) identifying a suite of practical measures, such as mentoring or best practice guidelines, that have been shown to or are considered to build human, social, institutional, and economic capital; (b) placing these measures within a broader systems framework; and (c) exploring stakeholder feedback on specific measures to inform framework implementation. The 29 measures described provide actors, whether government or nongovernment, with a suite of practical investment choices for building capacity. These measures are then clustered into eight groups according to their primary purpose and placed within a systems framework. The framework provides a tool for actors with responsibilities for or an interest in capacity building to inform more holistic and strategic targeting of effort and investment. Stakeholder feedback gathered through surveys and workshops is subsequently reported to further inform implementation of specific measures within the framework’s eight groupings. The framework presented may be built upon through the identification and inclusion of further capacity building measures. The research is conducted within the context of decentralized governance arrangements for natural resource management (NRM), with specific focus on Australia’s recently formalized 56 NRM regions and their community-based governing boards as an informative arena of learning. Application of the framework is explored in the Australian setting through the identification and comparison of measures supported and most preferred by four major stakeholder groups, namely board members, regional NRM organization staff, policy/research interests, and Indigenous interests. The research also examines stakeholder perceptions of capacity issues, and whether these issues are likely to be addressed through implementing their preferred measures.

  20. List of Contractors to Support Anthrax Remediation

    SciTech Connect

    Judd, Kathleen S.; Lesperance, Ann M.

    2010-05-14

    This document responds to a need identified by private sector businesses for information on contractors that may be qualified to support building remediation efforts following a wide-area anthrax release.

  1. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    SciTech Connect

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal.

  2. Protecting buildings from a biological or chemical attack: Actions to take before or during a release

    SciTech Connect

    Price, Phillip N.; Sohn, Michael D.; Gadgil, Ashok J.; Delp, William W.; Lorenzetti, David M.; Finlayson, Elizabeth U.; Thatcher, Tracy L.; Sextro, Richard G.; Derby, Elisabeth A.; Jarvis, Sondra A.

    2003-01-29

    This report presents advice on how to operate a building to reduce casualties from a biological or chemical attack, as well as potential changes to the building (e.g. the design of the ventilation system) that could make it more secure. It also documents the assumptions and reasoning behind the advice. The particular circumstances of any attack, such as the ventilation system design, building occupancy, agent type, source strength and location, and so on, may differ from the assumptions made here, in which case actions other than our recommendations may be required; we hope that by understanding the rationale behind the advice, building operators can modify it as required for their circumstances. The advice was prepared by members of the Airflow and Pollutant Transport Group, which is part of the Indoor Environment Department at the Lawrence Berkeley National Laboratory. The group's expertise in this area includes: tracer-gas measurements of airflows in buildings (Sextro, Thatcher); design and operation of commercial building ventilation systems (Delp); modeling and analysis of airflow and tracer gas transport in large indoor spaces (Finlayson, Gadgil, Price); modeling of gas releases in multi-zone buildings (Sohn, Lorenzetti, Finlayson, Sextro); and occupational health and safety experience related to building design and operation (Sextro, Delp). This report is concerned only with building design and operation; it is not a how-to manual for emergency response. Many important emergency response topics are not covered here, including crowd control, medical treatment, evidence gathering, decontamination methods, and rescue gear.

  3. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    SciTech Connect

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

  4. Using Action Planning to Build Organizational Capacity for the Prevention of Intimate Partner Violence

    ERIC Educational Resources Information Center

    Schober, Daniel J.; Fawcett, Stephen B.

    2015-01-01

    The DELTA PREP Project aims to reduce risk for intimate partner violence (IPV). It engaged leadership and staff from 19 statewide domestic violence coalitions in building capacity to prevent IPV before it occurs (rather than solely responding to IPV). This article describes the process and outcomes associated with action planning to create…

  5. Report of the Build Subsidized Child Care Rate Policy Task Force: Recommendations for Action

    ERIC Educational Resources Information Center

    Stoney, Louise

    2004-01-01

    In the Fall of 2003, the Pennsylvania Build Initiative convened a Rate Policy Task Force to broadly examine the issue of child care rates and make recommendations for action. The Task Force goal was two-fold: (1) to suggest ways that the rate and payment process currently used by the Pennsylvania Department of Public Welfare (DPW) can better…

  6. Corrective action baseline report for underground storage tank 2331-U Building 9201-1

    SciTech Connect

    Not Available

    1994-01-01

    The purpose of this report is to provide baseline geochemical and hydrogeologic data relative to corrective action for underground storage tank (UST) 2331-U at the Building 9201-1 Site. Progress in support of the Building 9201-1 Site has included monitoring well installation and baseline groundwater sampling and analysis. This document represents the baseline report for corrective action at the Building 9201-1 site and is organized into three sections. Section 1 presents introductory information relative to the site, including the regulatory initiative, site description, and progress to date. Section 2 includes the summary of additional monitoring well installation activities and the results of baseline groundwater sampling. Section 3 presents the baseline hydrogeology and planned zone of influence for groundwater remediation.

  7. Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)

    2001-01-01

    This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

  8. On the Use of TMDs for Regular Buildings and Bridges under Dynamic Actions

    SciTech Connect

    Moura Paredes, Miguel; Carneiro de Barros, Rui

    2010-05-21

    Some R and D done recently at FEUP, under control of vibrations using TMDs is described. The first part of this study is a parametric analysis of the performance of a TMD in the mitigation of the effects of earthquakes in building-like structures. The targeted parameters in the analyses were the number of storeys of the buildings, the mass ratio mu of the TMD, and the earthquake input signals. The number of storeys of the buildings varied from 5 to 30 with increments of 5 storeys. The mass ratio of the TMD varied from 0.00 to 0.05 with increments of 0.01. The actions considered were the 1951 El Centro earthquake and the 1995 Kobe earthquake. The second part of the study addresses the control of vibrations of a pedestrian bridge at Porto under excitations produced by the pedestrians themselves.

  9. Corrective action investigation plan for Corrective Action Unit Number 423: Building 03-60 Underground Discharge Point, Tonopah Test Range, Nevada

    SciTech Connect

    1997-10-27

    This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and the criteria for conducting site investigation activities at Corrective Action Unit (CAU) Number 423, the Building 03-60 Underground Discharge Point (UDP), which is located in Area 3 at the Tonopah Test Range (TTR). The TTR, part of the Nellis Air Force Range, is approximately 225 kilometers (140 miles) northwest of Las Vegas, Nevada. CAU Number 423 is comprised of only one Corrective Action Site (CAS) which includes the Building 03-60 UDP and an associated discharge line extending from Building 03-60 to a point approximately 73 meters (240 feet) northwest. The UDP was used between approximately 1965 and 1990 to dispose of waste fluids from the Building 03-60 automotive maintenance shop. It is likely that soils surrounding the UDP have been impacted by oil, grease, cleaning supplies and solvents as well as waste motor oil and other automotive fluids released from the UDP.

  10. Contractor or Employee? Reporting Independent Contractor Payments.

    ERIC Educational Resources Information Center

    Dickson, Roger J.

    1993-01-01

    Congress has approved new penalties to be assessed against employers who improperly file required tax forms. Includes a 20-factor control test developed by the Internal Revenue Service to help determine whether a worker is an employee or an independent contractor. School business officials should review payment procedures to ensure that proper tax…

  11. Action-Oriented Benchmarking: Using the CEUS Database to Benchmark Commercial Buildings in California

    SciTech Connect

    Mathew, Paul; Mills, Evan; Bourassa, Norman; Brook, Martha

    2008-02-01

    The 2006 Commercial End Use Survey (CEUS) database developed by the California Energy Commission is a far richer source of energy end-use data for non-residential buildings than has previously been available and opens the possibility of creating new and more powerful energy benchmarking processes and tools. In this article--Part 2 of a two-part series--we describe the methodology and selected results from an action-oriented benchmarking approach using the new CEUS database. This approach goes beyond whole-building energy benchmarking to more advanced end-use and component-level benchmarking that enables users to identify and prioritize specific energy efficiency opportunities - an improvement on benchmarking tools typically in use today.

  12. Building trust: Heart rate synchrony and arousal during joint action increased by public goods game.

    PubMed

    Mitkidis, Panagiotis; McGraw, John J; Roepstorff, Andreas; Wallot, Sebastian

    2015-10-01

    The physiological processes underlying trust are subject of intense interest in the behavioral sciences. However, very little is known about how trust modulates the affective link between individuals. We show here that trust has an effect on heart rate arousal and synchrony, a result consistent with research on joint action and experimental economics. We engaged participants in a series of joint action tasks which, for one group of participants, was interleaved with a PGG, and measured their heart synchrony and arousal. We found that the introduction of the economic game shifted participants' attention to the dynamics of the interaction. This was followed by increased arousal and synchrony of heart rate profiles. Also, the degree of heart rate synchrony was predictive of participants' expectations regarding their partners in the economic game. We conclude that the above changes in physiology and behavior are shaped by the valuation of other people's social behavior, and ultimately indicate trust building process. PMID:26037635

  13. A Safe Place to Stay Sharp: Action Learning Meets Cooperative Inquiry in the Service of NHS OD Capacity Building

    ERIC Educational Resources Information Center

    Traeger, James; Norgate, Carolyn

    2015-01-01

    This is an account of practice. It explores the meeting point between action learning and action research, as a way of doing capacity building in organisational development (OD) in the NHS in the UK. The authors were part of a short cooperative inquiry (Heron, J. 1996. "Co-operative Inquiry: Research into the Human Condition." London:…

  14. Seeing Glass Contractors Clearly.

    ERIC Educational Resources Information Center

    Deliberato, Jerry

    2003-01-01

    Offers seven tips for finding and working with an effective glass contractor. For example, schools should consider the company's reputation and longevity of service, and whether it has in-house engineering capabilities. (EV)

  15. Corrective Action Investigation Plan for Corrective Action Unit No. 423: Building 03-60 Underground Discharge Point, Tonopah Test Range, Nevada

    SciTech Connect

    DOE /NV

    1997-10-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV), the State of Nevada Division of Environmental Protection (NDEP), and the US Department of Defense. The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUS) or Corrective Action Sites (CASs) (FFACO, 1996). As per the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU No. 423, the Building 03-60 Underground Discharge Point (UDP), which is located in Area 3 at the Tonopah Test Range (TTR). The TTR, part of the Nellis Air Force Range, is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada (Figures 1-1 and 1-2). Corrective Action Unit No. 423 is comprised of only one CAS (No. 03-02-002-0308), which includes the Building 03-60 UDP and an associated discharge line extending from Building 03-60 to a point approximately 73 meters (m) (240 feet [ft]) northwest as shown on Figure 1-3.

  16. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ... SPACE ADMINISTRATION Information Collection; NASA Contractor Financial Management Reports AGENCY: National Aeronautics and Space Administration (NASA). ACTION: Notice of information collection. SUMMARY... collection instrument(s) and instructions should be directed to Ms. Frances Teel, NASA Clearance...

  17. Scale Matters: An Action Plan for Realizing Sector-Wide"Zero-Energy" Performance Goals in Commercial Buildings

    SciTech Connect

    Selkowitz, Stephen; Selkowitz, Stephen; Granderson, Jessica; Haves, Philip; Mathew, Paul; Harris, Jeff

    2008-06-16

    It is widely accepted that if the United States is to reduce greenhouse gas emissions it must aggressively address energy end use in the building sector. While there have been some notable but modest successes with mandatory and voluntary programs, there have also been puzzling failures to achieve expected savings. Collectively, these programs have not yet reached the majority of the building stock, nor have they yet routinely produced very large savings in individual buildings. Several trends that have the potential to change this are noteworthy: (1) the growing market interest in 'green buildings' and 'sustainable design', (2) the major professional societies (e.g. AIA, ASHRAE) have more aggressively adopted significant improvements in energy efficiency as strategic goals, e.g. targeting 'zero energy', carbon-neutral buildings by 2030. While this vision is widely accepted as desirable, unless there are significant changes to the way buildings are routinely designed, delivered and operated, zero energy buildings will remain a niche phenomenon rather than a sector-wide reality. Toward that end, a public/private coalition including the Alliance to Save Energy, LBNL, AIA, ASHRAE, USGBC and the World Business Council for Sustainable Development (WBCSD) are developing an 'action plan' for moving the U.S. commercial building sector towards zero energy performance. It addresses regional action in a national framework; integrated deployment, demonstration and R&D threads; and would focus on measurable, visible performance indicators. This paper outlines this action plan, focusing on the challenge, the key themes, and the strategies and actions leading to substantial reductions in GHG emissions by 2030.

  18. Unions, Contractors and CTE

    ERIC Educational Resources Information Center

    Jarosz, Francesca

    2006-01-01

    Across Illinois, in places where unions thrive, construction industry professionals and career and technical education (CTE) teachers are working together in promoting work-based learning program to students. Likewise, the outreach program provides union-supported contractors with qualified candidates for future employment. Programs such as the…

  19. Corrective Action Decision Document/Closure Report for Corrective Action Unit 263: Area 25 Building 4839 Leachfield, Nevada Test Site, Nevada

    SciTech Connect

    1999-10-01

    This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 263, Area 25 Building 4839 Leachfield, in accordance with the Federal Facility Agreement and Consent Order. Corrective Action Unit 263 is located in the southwestern part of the Nevada Test Site in Nevada and includes one Corrective Action Site (CAS), CAS 25-05-04 Leachfield. This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action for CAU 263 is necessary. The Corrective Action Decision Document and Closure Report have been combined into one report because sample data collected during the April 1999 corrective action investigation (CAI) disclosed no evidence of contamination at the site. The purpose of the CAI was to identify the presence and the vertical and lateral extent of contaminants of potential concern (COPCs), specifically volatile organic compounds (VOCs) and semivola tile organic compounds (SVOCs) such as 1,4-dichlorobenzene and p-isopropyl toluene. The subsequent investigation included direct-push environmental soil samples from within the leachfield using a Geoprobe{reg_sign} unit; field screening of soil samples for radiological constituents and VOCs; submittal of environmental and quality control samples for testing for total VOCs, total SVOCs, and gamma spectrometry; and collection of soil samples from both the liquid phase and the underlying sludge of the septic tank contents. The CAI activities determined that: (1) all total VOC and total SVOC results were below the preliminary action levels outlined in the Corrective Action Investigation Plan (CAIP), and (2) radiological results were not distinguishable from background concentrations identified in the CAIP. Therefore, the DOE/NV recommended that no corrective action was required at CAU 263. No use restrictions were required to be placed on the CAU because the investigation showed no

  20. Indoor Air Quality: Federal and State Actions To Address the Indoor Air Quality Problems of Selected Buildings.

    ERIC Educational Resources Information Center

    Guerrero, Peter F.

    U.S. House of Representative members requested that the General Accounting Office determine what federal and state actions have been taken in addressing indoor air quality (IAQ) concerns raised in certain school, state, and federal buildings within Vermont, Maryland, and the District of Columbia. This report responds to this request and describes…

  1. The Practical Integration of Action Research into Building Climate Literacy and Partnership with Key Influentials

    NASA Astrophysics Data System (ADS)

    Estrada, M.

    2015-12-01

    Climate Education Partners (CEP) has been using an action research approach to build climate literacy and partnership with key influential (KI) leaders in the San Diego community. After identifying 6 key sectors that either (a) could reduce green house gas emissions and adapt to impacts, or (b) would be highly vulnerable to the impacts of climate change, we conducted 89 interviews with KIs from the San Diego region -- including elected officials, academics, laborers, and representatives from local businesses, non-profits, ethnic and cultural communities, faith-based groups, and special interest groups -- to assess their science knowledge and opinions about climate change and the impacts of climate change. Other questions asked were about KIs' personal efficacy, identity, values and engagement in pro-environmental behaviors related to climate change. The results of the interviews contributed to CEP's action research approach in two ways: 1) it provided critical data regarding which leaders wanted further engagement with CEP and what that engagement should entail (e.g., being a connector to other leaders, a spokesperson, or a participant in future educational activities), and 2) it provided key information about the extent to which "knowledge deficit" is related to use of climate change knowledge to inform engagement in mitigation and adaptive behaviors. Practically, the results were used to create a database that is being used to inform the contact and education of KIs. We were able to show, consistent with previous research and identity theory, that liberal leaders were more likely than conservatives to believe in, feel concern for, and be knowledgeable about climate change. However, engagement in mitigation behaviors- specifically making decisions that would reduce electricity, gas, or water use- were similar for both groups. These results are being used to create resources and direct climate education activities going forward.

  2. Corrective Action Decision Document/Closure Report for Corrective Action Unit 266: Area 25 Building 3124 Leachfield, Nevada Test Site, Nevada

    SciTech Connect

    NNSA /NV

    2000-02-17

    This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared for Corrective Action Unit (CAU) 266, Area 25 Building 3124 Leachfield, in accordance with the Federal Facility Agreement and Consent Order. Located in Area 25 at the Nevada Test Site in Nevada, CAU 266 includes Corrective Action Site (CAS) 25-05-09. The Corrective Action Decision Document and Closure Report were combined into one report because sample data collected during the corrective action investigation (CAI) indicated that contaminants of concern (COCs) were either not present in the soil, or present at concentrations not requiring corrective action. This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's recommendation that no corrective action was necessary for CAU 266. From February through May 1999, CAI activities were performed as set forth in the related Corrective Action Investigation Plan. Analytes detected during the three-stage CAI of CAU 266 were evaluated against preliminary action levels (PALs) to determine COCs, and the analysis of the data generated from soil collection activities indicated the PALs were not exceeded for total volatile/semivolatile organic compounds, total petroleum hydrocarbons, polychlorinated biphenyls, total Resource Conservation and Recovery Act metals, gamma-emitting radionuclides, isotopic uranium/plutonium, and strontium-90 for any of the samples. However, COCs were identified in samples from within the septic tank and distribution box; and the isotopic americium concentrations in the two soil samples did exceed PALs. Closure activities were performed at the site to address the COCs identified in the septic tank and distribution box. Further, no use restrictions were required to be placed on CAU 266 because the CAI revealed soil contamination to be less than the 100 millirems per year limit established by DOE Order 5400.5.

  3. Hydrogen Contractors Meeting

    SciTech Connect

    Fitzsimmons, Tim

    2006-05-16

    This volume highlights the scientific content of the 2006 Hydrogen Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) on behalf of the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). Hydrogen Contractors Meeting held from May 16-19, 2006 at the Crystal Gateway Marriott Hotel Arlington, Virginia. This meeting is the second in a series of research theme-based Contractors Meetings sponsored by DMS&E held in conjunction with our counterparts in the Office of Energy Efficiency and Renewable Energy (EERE) and the first with the Hydrogen, Fuel Cells and Infrastructure Technologies Program. The focus of this year’s meeting is BES funded fundamental research underpinning advancement of hydrogen storage. The major goals of these research efforts are the development of a fundamental scientific base in terms of new concepts, theories and computational tools; new characterization capabilities; and new materials that could be used or mimicked in advancing capabilities for hydrogen storage.

  4. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part...

  5. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part...

  6. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part...

  7. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part...

  8. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part...

  9. 48 CFR 2452.237-75 - Clearance of contractor personnel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... passes issued to the contractor's employees. (d) Control of access. HUD shall have and exercise full and... are applicable to performance of the subcontract. (End of clause) ... employees' physical presence in the HUD facility. (c) Building passes. (1) HUD will issue a building pass...

  10. Government - contractor interaction

    NASA Technical Reports Server (NTRS)

    Thomas, D. M.

    1983-01-01

    The development of the Administrative Contracting Officer represents an advance in the Government system of contract management because it provides an individual with knowledge, time, and a specialized function to insure performance of Government contracts. However, the development has created a dichotomy between the award and the post-award function which increases the adversary relationship with Government contractors. This paper advocates that this adversary relationship can be decreased if PCOs and ACOs are provided with opportunities to serve in the assignments of the other.

  11. Employee vs independent contractor.

    PubMed

    Kolender, Ellen

    2012-01-01

    Finding qualified personnel for the cancer registry department has become increasingly difficult, as experienced abstractors retire and cancer diagnoses increase. Faced with hiring challenges, managers turn to teleworkers to fill positions and accomplish work in a timely manner. Suddenly, the hospital hires new legal staff and all telework agreements are disrupted. The question arises: Are teleworkers employees or independent contractors? Creating telework positions requires approval from the legal department and human resources. Caught off-guard in the last quarter of the year, I found myself again faced with hiring challenges. PMID:23599033

  12. Corrective Action Investigation Plan for Corrective Action Unit 266: Area 25 Building 3124 Leachfield, Nevada Test Site, Nevada, Revision 1, February 1999

    SciTech Connect

    U.S. Department Of Energy, Nevada Operations Office

    1999-02-24

    The Corrective Action Investigation Plan for Corrective Action Unit 266, Area 25 Building 3124 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U.S. Department of Defense. Corrective Action Unit 266 consists of the Corrective Action Site 25-05-09 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 266. Corrective Action Unit 266 is located southwest of Building 3124 which is located southwest and adjacent to Test Cell A. Test Cell A was operational during the 1960s to test nuclear rocket reactors in support of the Nuclear Rocket Development Station. Operations within Building 3124 from 1962 through the early 1990s resulted in effluent releases to the leachfield and associated collection system. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with Test Cell A reactor testing operations, various laboratories including a high-level radioactivity environmental sample handling laboratory, and possibly the Treatability Test Facility. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include radionuclides, oil/diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. Samples will also be analyzed for radionuclides and polychlorinated biphenyls not

  13. The Purpose of Mess in Action Research: Building Rigour though a Messy Turn

    ERIC Educational Resources Information Center

    Cook, Tina

    2009-01-01

    Mess and rigour might appear to be strange bedfellows. This paper argues that the purpose of mess is to facilitate a turn towards new constructions of knowing that lead to transformation in practice (an action turn). Engaging in action research--research that can disturb both individual and communally held notions of knowledge for practice--will…

  14. Shaping a New Professional Identity by Building a New Personal Concept of Leadership through Action Research

    ERIC Educational Resources Information Center

    Margolin, Ilana

    2007-01-01

    This study describes three action cycles I identified retrospectively and examines the processes I underwent through the lens of research literature dealing with leadership. I then provide a retrospective account of my reflections on my actions over a four-year period. As the head of the Elementary School Department in a teacher education college,…

  15. Buildings radiological characterization report for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1990-04-01

    This report summarizes radiological characterization data on the Weldon Spring Chemical Plant (WSCP) buildings gathered as part of five previous investigations, and provides a consistent will be used to support future feasibility studies which will determine the best available technologies for ultimate disposition of the buildings and associated equipment. At present no structure or piece of equipment can be released from the WSCP for unrestricted use without further radiation measurements being performed. A final group of equipment and building components contains surface radioactivity levels in excess of DOE guidelines; this group, usually found in buildings housing uranium and/or thorium processing equipment, will require decontamination and comprehensive scanning in order to be considered for unrestricted use release. 9 refs., 44 tabs.

  16. Contractor Accountability Act

    THOMAS, 111th Congress

    Rep. Sutton, Betty [D-OH-13

    2009-03-05

    05/04/2009 Referred to the Subcommittee on Government Management, Organization, and Procurement. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  17. Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

    SciTech Connect

    Jeremy Gwin and Douglas Frenette

    2010-09-30

    This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values and corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room

  18. Corrective Action Investigation Plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfields, Nevada Test Site, Revision 0, DOE/NV--535 UPDATED WITH RECORD OF TECHNICAL CHANGE No.1

    SciTech Connect

    US DOE Nevada Operations Office

    1999-04-12

    The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

  19. Independent contractor arrangements and IRS audits.

    PubMed

    Pelfrey, S; Theisen, B A

    1995-01-01

    As government auditors begin their challenges, nurse executives need to review their operations to remove any potential audit risks. Although a common practice for many institutions, the use of independent contractor arrangements may be ruled inappropriate. As a result, many individuals may be reclassified as employees, leading to Internal Revenue Service (IRS) assessments of penalties and back payroll taxes. It always is prudent to anticipate IRS actions and shore up any areas that may lead to tax assessments before they are imposed on the institution. PMID:7636578

  20. Strategic Capacity Building for Australian Educational Research: Creating Spaces for Action

    ERIC Educational Resources Information Center

    Goodyear, Peter

    2013-01-01

    This paper provides some background information about the Strategic Capacity Building for Australian Educational Research initiative: a joint program of work sponsored by the Australian Association for Research in Education and the Australian Council of Deans of Education. In addition, it offers some broader analysis of the contexts within which…

  1. Building Voice, Taking Action: Experiences of Youth from a Civic Focused School

    ERIC Educational Resources Information Center

    Gordon, Pamela Jane

    2011-01-01

    This project builds on existing literature which argues that schools, given their broad reaching influence, can serve as central institutions to help encourage and sustain civic engagement (Bixby & Pace, 2008; Branson, 2001; CIRCLE, 2003; Gutmann, 1987; Putnam, 2000; Flanagan & Faison, 2001; Galston, 2003; Atkins & Hart, 2002; Torney-Purta,…

  2. Effective Literacy Coaching: Building Expertise and a Culture of Literacy: An ASCD Action Tool

    ERIC Educational Resources Information Center

    Blachowicz, Camille L.Z.; Buhle, Roberta; Frost, Shari

    2009-01-01

    In "Effective Literacy Coaching: Building Expertise and a Culture of Literacy," literacy experts Shari Frost, Roberta Buhle, and Camille Blachowicz provide more than 50 practical activities designed to help K-12 literacy professionals: (1) Assess the current literacy program; (2) Plan changes that will foster a culture of literacy; (3) Collaborate…

  3. Building Work Skills through Volunteering. Ideas for Action in Education and Work.

    ERIC Educational Resources Information Center

    Clark, Marilyn

    A progress report on "Building Work Skills through Volunteering," a demonstration project designed to use the volunteer experience to develop and practice work skills, is presented. The initial section describes the participants, methods, and materials at each of four sites: a private corporation, a suburban school district, a voluntary…

  4. Overseas Contractor Reform Act

    THOMAS, 111th Congress

    Rep. Welch, Peter [D-VT-At Large

    2010-05-20

    09/16/2010 Received in the Senate and Read twice and referred to the Committee on Homeland Security and Governmental Affairs. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  5. Building Momentum--Taking Action: Southern States Collaborate on Child Care Financial Aid and Quality Initiatives.

    ERIC Educational Resources Information Center

    Southern Inst. on Children and Families, Columbia, SC.

    In the year 2000, the Southern Regional Task Force on Child Care was formed with representatives from 16 southern states and the District of Columbia as well as appointments from the Southern Institute on Children and Families and the Southern Growth Policies Board to collaborate in developing an action plan to improve access to child care…

  6. Building Social Capital through Action Learning: An Insight into the Entrepreneur

    ERIC Educational Resources Information Center

    Taylor, David W.; Jones, Oswald; Boles, Kevin

    2004-01-01

    According to Woolcock, social capital can be defined as the "norms and networks facilitating collective action for mutual benefit". Furthermore, Gabbay and Leenders suggest that social capital offers some potential for integrating the proliferation of network research that has been developed over the last 30 years. Examines an innovatory…

  7. Building Knowledge Exchange Capacity in a Small UK University: Outcomes of Action Research

    ERIC Educational Resources Information Center

    Davis, Sally Fowler

    2012-01-01

    The UK's university sector is seeking to improve its participation in the knowledge economy and meet policy and financial imperatives. This paper reveals some of the opportunities and pitfalls in making that objective a reality in the context of a single university. The findings and organizational development resulting from an action research…

  8. Debarment and suspension. [of contractors

    NASA Technical Reports Server (NTRS)

    Whelan, Thomas J.

    1987-01-01

    The changing Government attitude toward contractor debarment and suspension is examined, with emphasis on the fact that the Government is more alert to fraud, waste, and abuse. Consideration is given to causes of debarment or suspension, procedures and due process hearings, settlement agreements, compliance programs, and recent related legislation. It is concluded that the change in the Government contracting environment in recent years should be sufficient incentive for contractors to monitor their operations more closely.

  9. How to Build an Intentional Android: Infants' Imitation of a Robot's Goal-Directed Actions

    ERIC Educational Resources Information Center

    Itakura, Shoji; Ishida, Hiraku; Kanda, Takayuki; Shimada, Yohko; Ishiguro, Hiroshi; Lee, Kang

    2008-01-01

    This study examined whether young children are able to imitate a robot's goal-directed actions. Children (24-35 months old) viewed videos showing a robot attempting to manipulate an object (e.g., putting beads inside a cup) but failing to achieve its goal (e.g., beads fell outside the cup). In 1 video, the robot made eye contact with a human…

  10. Technical Assistance Contractor management plan. Revision 1

    SciTech Connect

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  11. 78 FR 12106 - Debarment, Suspension, and Ineligibility of Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ... MANAGEMENT Debarment, Suspension, and Ineligibility of Contractors AGENCY: U.S. Office of Personnel Management (OPM). ACTION: Notice. SUMMARY: The U.S. Office of Personnel Management (OPM) is providing notice... comments concerning this proposed policy to: U.S. Office of Personnel Management, Contracting;...

  12. 48 CFR 52.225-26 - Contractors Performing Private Security Functions Outside the United States.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... background checks), and security requirements established by 32 CFR part 159, Private Security Contractors... contract comply with 32 CFR part 159, and with any orders, directives, and instructions to Contractors... CFR part 159. Such action may be taken at the Government's discretion without prejudice to its...

  13. 48 CFR 2922.101-4 - Removal of items from contractor facilities affected by work stoppages.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Removal of items from contractor facilities affected by work stoppages. 2922.101-4 Section 2922.101-4 Federal Acquisition... stoppages. Before initiating any action under FAR 22.101-4 for removal of items from contractors'...

  14. 48 CFR 1422.101-4 - Removal of items from contractors' facilities affected by work stoppages.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Removal of items from contractors' facilities affected by work stoppages. 1422.101-4 Section 1422.101-4 Federal Acquisition... stoppages. Prior to initiating any action for removal of items from contractors' facilities, the CO...

  15. 48 CFR 1422.101-4 - Removal of items from contractors' facilities affected by work stoppages.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Removal of items from contractors' facilities affected by work stoppages. 1422.101-4 Section 1422.101-4 Federal Acquisition... stoppages. Prior to initiating any action for removal of items from contractors' facilities, the CO...

  16. 48 CFR 2922.101-4 - Removal of items from contractor facilities affected by work stoppages.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Removal of items from contractor facilities affected by work stoppages. 2922.101-4 Section 2922.101-4 Federal Acquisition... stoppages. Before initiating any action under FAR 22.101-4 for removal of items from contractors'...

  17. 78 FR 13394 - 30-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... Notice of Proposed Information Collection: Office of Language Services Contractor Application Form ACTION... Language Services Contractor Application Form. OMB Control Number: 1405-0191. Type of Request: Extension of... U.S. Department of State, Office of Language Services, the information collected is used to...

  18. Building Tool Use From Object Manipulation: A Perception-Action Perspective

    PubMed Central

    Kahrs, Björn A.; Lockman, Jeffrey J.

    2015-01-01

    Tools are a universal feature of human culture. While most past research on tool use has focused on its cognitive underpinnings, in the present article we adopt a perception-action approach to understand how tool use emerges in early development. In this context, we review our work on infant object banging and how it may serve as a motor substrate for percussive tool use. Our results suggest that infants use banging to act on environmental surfaces selectively. Additionally, with increasing age, banging becomes more controlled and manifests many characteristics associated with skilled hammering. Taken together, the results suggest that there is much to be gained from considering the emergence of tool use as an ongoing process of perceptuomotor adaptation to handheld objects. PMID:25678761

  19. Actionable knowledge and strategic decision making for bio- and agroterrorism threats: building a collaborative early warning culture.

    PubMed

    Mårtensson, Per-Åke; Hedström, Lars; Sundelius, Bengt; Skiby, Jeffrey E; Elbers, Armin; Knutsson, Rickard

    2013-09-01

    Current trends in biosecurity and cybersecurity include (1) the wide availability of technology and specialized knowledge that previously were available only to governments; (2) the global economic recession, which may increase the spread of radical non-state actors; and (3) recent US and EU commission reports that reflect concerns about non-state actors in asymmetric threats. The intersectoral and international nature of bioterrorism and agroterrorism threats requires collaboration across several sectors including intelligence, police, forensics, customs, and other law enforcement organizations who must work together with public and animal health organizations as well as environmental and social science organizations. This requires coordinated decision making among these organizations, based on actionable knowledge and information sharing. The risk of not sharing information among organizations compared to the benefit of sharing information can be considered in an "information sharing risk-benefit analysis" to prevent a terrorism incident from occurring and to build a rapid response capability. In the EU project AniBioThreat, early warning is the main topic in work package 3 (WP 3). A strategy has been generated based on an iterative approach to bring law enforcement agencies and human and animal health institutes together. Workshops and exercises have taken place during the first half of the project, and spin-off activities include new preparedness plans for institutes and the formation of a legal adviser network for decision making. In addition, a seminar on actionable knowledge was held in Stockholm, Sweden, in 2012, which identified the need to bring various agency cultures together to work on developing a resilient capability to identify early signs of bio- and agroterrorism threats. The seminar concluded that there are a number of challenges in building a collaborative culture, including developing an education program that supports collaboration and shared

  20. Technical safety appraisal: Buildings 776/777 Rocky Flats Plant

    SciTech Connect

    Field, H C

    1988-03-01

    Buildings 776/777 at the Rocky Flats Plant are major components of the production complex at the plant site. They have been in operation since 1957. The operations taking place in the buildings are nuclear weapons production support, processing of weapons assemblies returned from Pantex, waste processing, research and development in support of production, special projects, and those generated by support groups, such as maintenance. The appraisal team identified nine deficiencies that it believed required prompt attention. DOE management for EH, the program office (Defense Programs), and the field office analyzed the information provided by the appraisal team and instituted compensatory measures for closer monitoring of contractor activities by knowledgeable DOE staff and staff from other sites. Concurrently, the contractor was requested to address both short-term and long-term remedial measures to correct the identified issues as well as the underlying problems. The contractor has provided his action plan, which is included. This plan was under evaluation by EH and the DOE program office at the time this report was prepared. In addressing the major areas of concern identified above, a well as the specific deficiencies identified by the appraisal team, the contractor and the field office are cautioned to search for the root causes for the problems and to direct corrective actions to those root causes rather than solely to the symptoms to assure the sustainability of the improvements being made. The results of prior TSAs led DOE to conclude that previous corrective actions were not sufficient in that a large number of the individual findings are recurrent. Pending completion of remedial actions over the next few months, enhanced DOE oversight of the contractor is warranted.

  1. Building predictive models for mechanism-of-action classification from phenotypic assay data sets.

    PubMed

    Berg, Ellen L; Yang, Jian; Polokoff, Mark A

    2013-12-01

    Compound mechanism-of-action information can be critical for drug development decisions but is often challenging for phenotypic drug discovery programs. One concern is that compounds selected by phenotypic screening will have a previously known but undesirable target mechanism. Here we describe a useful method for assigning mechanism class to compounds and bioactive agents using an 84-feature signature from a panel of primary human cell systems (BioMAP systems). For this approach, a reference data set of well-characterized compounds was used to develop predictive models for 28 mechanism classes using support vector machines. These mechanism classes encompass safety and efficacy-related mechanisms, include both target-specific and pathway-based classes, and cover the most common mechanisms identified in phenotypic screens, such as inhibitors of mitochondrial and microtubule function, histone deacetylase, and cAMP elevators. Here we describe the performance and the application of these predictive models in a decision scheme for triaging phenotypic screening hits using a previously published data set of 309 environmental chemicals tested as part of the Environmental Protection Agency's ToxCast program. By providing quantified membership in specific mechanism classes, this approach is suitable for identification of off-target toxicity mechanisms as well as enabling target deconvolution of phenotypic drug discovery hits. PMID:24088371

  2. Interactive actions of Bdnf methylation and cell metabolism for building neural resilience under the influence of diet

    PubMed Central

    Tyagi, Ethika; Zhuang, Yumei; Agrawal, Rahul; Ying, Zhe; Gomez-Pinilla, Fernando

    2015-01-01

    Quality nutrition during the period of brain formation is a predictor of brain functional capacity and plasticity during adulthood; however it is not clear how this conferred plasticity imparts long-term neural resilience. Here we report that early exposure to dietary omega-3 fatty acids orchestrates key interactions between metabolic signals and Bdnf methylation creating a reservoir of neuroplasticity that can protect the brain against the deleterious effects of switching to a western diet (WD). We observed that the switch to a WD increased Bdnf methylation specific to exon IV, in proportion to anxiety-like behavior, in Sprague Dawley rats reared in low omega-3 fatty acid diet, and these effects were abolished by the DNA methyltransferase inhibitor 5-aza-2'-deoxycytidine. Blocking methylation also counteracted the reducing action of WD on the transcription regulator CTCF binding to Bdnf promoter IV. In vitro studies confirmed that CTCF binding to Bdnf promoter IV is essential for the action of DHA on BDNF regulation. Diet is also intrinsically associated to cell metabolism, and here we show that the switch to WD downregulated cell metabolism (NAD/NADH ratio and SIRT1). The fact that DNA methyltransferase inhibitor did not alter these parameters suggests they occur upstream to methylation. In turn, the methylation inhibitor counteracted the action of WD on PGC-1α, a mitochondrial transcription co-activator and BDNF regulator, suggesting that PGC-1α is an effector of Bdnf methylation. Results support a model in which diet can build an “epigenetic memory” during brain formation that confers resilience to metabolic perturbations occurring in adulthood. PMID:25283985

  3. Interactive actions of Bdnf methylation and cell metabolism for building neural resilience under the influence of diet.

    PubMed

    Tyagi, Ethika; Zhuang, Yumei; Agrawal, Rahul; Ying, Zhe; Gomez-Pinilla, Fernando

    2015-01-01

    Quality nutrition during the period of brain formation is a predictor of brain functional capacity and plasticity during adulthood; however it is not clear how this conferred plasticity imparts long-term neural resilience. Here we report that early exposure to dietary omega-3 fatty acids orchestrates key interactions between metabolic signals and Bdnf methylation creating a reservoir of neuroplasticity that can protect the brain against the deleterious effects of switching to a Western diet (WD). We observed that the switch to a WD increased Bdnf methylation specific to exon IV, in proportion to anxiety-like behavior, in Sprague Dawley rats reared in low omega-3 fatty acid diet, and these effects were abolished by the DNA methyltransferase inhibitor 5-aza-2'-deoxycytidine. Blocking methylation also counteracted the reducing action of WD on the transcription regulator CTCF binding to Bdnf promoter IV. In vitro studies confirmed that CTCF binding to Bdnf promoter IV is essential for the action of DHA on BDNF regulation. Diet is also intrinsically associated to cell metabolism, and here we show that the switch to WD downregulated cell metabolism (NAD/NADH ratio and SIRT1). The fact that DNA methyltransferase inhibitor did not alter these parameters suggests they occur upstream to methylation. In turn, the methylation inhibitor counteracted the action of WD on PGC-1α, a mitochondrial transcription co-activator and BDNF regulator, suggesting that PGC-1α is an effector of Bdnf methylation. Results support a model in which diet can build an "epigenetic memory" during brain formation that confers resilience to metabolic perturbations occurring in adulthood. PMID:25283985

  4. Removal action report on the Building 3001 canal at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1997-05-01

    Oak Ridge National Laboratory (ORNL) is a federal facility managed by Lockheed Martin C, Energy Research, Inc., for the U.S. Department of Energy (DOE). ORNL on the Oak Ridge Reservation in East Tennessee at the Anderson and Roane County lines, approximately 38 km (24 miles) west of Knoxville, Tennessee, and 18 km (11 miles) southwest of downtown Oak Ridge. The Oak Ridge Graphite Reactor and its storage and transfer canal are located in Bldg. 3001 in the approximate center of Waste Area Grouping I in the ORNL main complex. 4:1 The Bldg. 3001 Storage Canal is an L-shaped, underground, reinforced-concrete structure running from the back and below the Graphite Reactor in Bldg. 3001 to a location beneath a hot cell in the adjacent Bldg. 3019. The Graphite Reactor was built in 1943 to produce small quantities of plutonium and was subsequently used to produce other isotopes for medical research before it was finally shut down in 1963. The associated canal was used to transport, under water, spent fuel slugs and other isotopes from the back of the reactor to the adjacent Bldg. 31319 hot cell for further processing. During its operation and years subsequent to operation, the canal`s concrete walls and floor became contaminated with radioisotopes from the water.This report documents the activities involved with replacing the canal water with a solid, controlled, low-strength material (CLSM) in response to a Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action.

  5. Closure report for decontamination and decommissioning (D and D) category, Corrective Action Unit 95, EPA Farm Laboratory Building 15-06, Nevada Test Site

    SciTech Connect

    1998-02-01

    The EPA Farm Laboratory Building 15-06 was located in Area 15 of the Nevada Test Site (NTS), Nye County, Nevada. The facility is identified as Corrective Action Unit (CAU) 95, Corrective Action Site 15-41-01, in the Federal Facilities Agreement and Consent Order and was assigned to Functional Category 41 (Decontamination and Decommissioning [D and D] Facility.) In August 1997, the Department of Energy/Nevada (DOE/NV) accelerated the corrective actions for CAU 95. A final Corrective Action Decision Document and a draft Corrective Action Plan were submitted to the Nevada Division of Environmental Protection (NDEP) and notification was made to the NDEP that work would proceed at the site while the documents were reviewed. The NDEP approved the decontamination and demolition of the Laboratory Building as the corrective action alternative most suitable for the closure of CAU 95. Closure activities were initiated on September 2, 1997 and completed October 23, 1997. The decontamination of Building 15-06 was accomplished in conference with the D and D Subproject Characterization Work Plan and the Quality Assurance Project Plan.

  6. Thermoclastic and cryoclastic action on calcareous building stone: durability to artificial ageing

    NASA Astrophysics Data System (ADS)

    Germinario, Luigi; Andriani, Gioacchino Francesco; Laviano, Rocco

    2014-05-01

    were petrographically characterized through optical microscopy on thin section, followed by a geotechnical parameterization with petrophysical measurements (dry density, total porosity, MIP porosity) and indirect ultrasonic and sclerometric tests. Then, after every 20 ageing cycles, the same tests stated above were carried out; in addition, the measurement of residual strains and SEM observations were performed. With this methodology, the gradual modifications in fabric, petrophysical and mechanical properties of the tested stone were analyzed. The results revealed a high durability of the material to the conditions of ageing experimented. The main modifications of the samples concerned fabric, i.e. microcracking due to thermoclastic and cryoclastic action, which occurred only in limited areas for an uneven distribution of internal stresses. For this reason, no evident effects on the macroscopic integrity and physico-mechanical performance were noted, whereas the stone almost preserved the original strength and elasticity. Finally, the data gathered were used to suggest a method for the evaluation of the vulnerability of "pietra gentile" to freeze-thaw microcracking, based on the peculiar porosimetric distribution and the environmental conditions of weathering. New information are globally provided about a stone material that has been largely used in the Apulian monumental heritage, but has received scarce attention from the archaeometric research so far.

  7. Corrective Action Investigation Plan for Corrective Action Unit 406: Area 3 Building 03-74 and Building 03-58 Under ground Discharge Points and Corrective Action Unit 429: Area 3 Building 03-55 and Area 9 Building 09-52 Underground Discharge Points, Tonopah Test Range, Nevada

    SciTech Connect

    DOE /NV

    1999-05-20

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the Underground Discharge Points (UDPs) included in both CAU 406 and CAU 429. The CAUs are located in Area 3 and Area 9 of the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada.

  8. 45 CFR 5b.12 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Contractors. 5b.12 Section 5b.12 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION PRIVACY ACT REGULATIONS § 5b.12 Contractors. (a) All contracts entered into on or after September 27, 1975 which require a contractor to...

  9. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a...

  10. 7 CFR 1726.27 - Contractor's bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall...

  11. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contractor responsibilities. 46.105 Section 46.105 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations...

  12. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a...

  13. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a...

  14. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a...

  15. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a...

  16. Space plasma contractor research, 1988

    NASA Technical Reports Server (NTRS)

    Williams, John D.; Wilbur, Paul J.

    1989-01-01

    Results of experiments conducted on hollow cathode-based plasma contractors are reported. Specific tests in which attempts were made to vary plasma conditions in the simulated ionospheric plasma are described. Experimental results showing the effects of contractor flowrate and ion collecting surface size on contactor performance and contactor plasma plume geometry are presented. In addition to this work, one-dimensional solutions to spherical and cylindircal space-charge limited double-sheath problems are developed. A technique is proposed that can be used to apply these solutions to the problem of current flow through elongated double-sheaths that separate two cold plasmas. Two conference papers which describe the essential features of the plasma contacting process and present data that should facilitate calibration of comprehensive numerical models of the plasma contacting process are also included.

  17. Perspectives from Ethiopia regarding U.S. military humanitarian assistance: how to build a better medical civil action project (MEDCAP).

    PubMed

    Miles, Shana; Malone, Joseph L

    2013-12-01

    Assuming that budgetary constraints continue over the next several years, the U.S. military's overseas medical activities including medical civic action projects (MEDCAPs) and humanitarian assistance projects could comprise an increasing proportion of the contributions of U.S. government (USG) to improving global health. We have identified several issues with MEDCAPs in Ethiopia since 2009 that resulted in delays or project cancellations. These were mostly related to lack of a plan to develop sustainable capacities. Although there are many obvious medical needs for civilian populations in Ethiopia, the provision of sustainable development assistance involving these Ethiopian populations on behalf of the USG is a complex undertaking involving coordination with many partners and coordination with several other USG agencies. Military medical professionals planning MEDCAPs and other cooperative global health projects would benefit from consultation and close coordination with U.S. Centers for Disease Control and Prevention (CDC) and U.S. Agency of International Development (USAID) experts who are involved in supporting medium- and long-term health projects in Ethiopia. The establishment of durable military medical academic relationships and involvement of overseas military medical research units could also help promote sustainable projects and build robust professional relationships in global health. PMID:24306018

  18. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 45.105 Contractors' property management... the contractor's property management policies, procedures, practices, and systems. This analysis shall... property administrator shall notify the contractor in writing when the contractor's property...

  19. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 45.105 Contractors' property management... the contractor's property management policies, procedures, practices, and systems. This analysis shall... property administrator shall notify the contractor in writing when the contractor's property...

  20. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 45.105 Contractors' property management... the contractor's property management policies, procedures, practices, and systems. This analysis shall... property administrator shall notify the contractor in writing when the contractor's property...

  1. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 45.105 Contractors' property management... the contractor's property management policies, procedures, practices, and systems. This analysis shall... property administrator shall notify the contractor in writing when the contractor's property...

  2. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 45.105 Contractors' property management... the contractor's property management policies, procedures, practices, and systems. This analysis shall... property administrator shall notify the contractor in writing when the contractor's property...

  3. Technical assistance contractor Management Plan. Final [report

    SciTech Connect

    Not Available

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  4. Adaptable contractors thrive in changing domestic market

    SciTech Connect

    Watts, J.

    1984-01-01

    This paper describes how contractors will cope with the number of smaller lines and projects as opposed to long-line, big-inch pipeline projects. The paper also examines maintenance of the system and upgrading as opposed to new construction. The contractors also comment on how they are keeping down personnel and equipment, the major items in a contractor's budget. Innovations in construction methods and equipment are examined.

  5. The metal alloys from the XIX century and weathering action in the Mercado do Ver-o-Peso building, northern Brazil: Identification with the usage of laboratory analysis

    SciTech Connect

    Palácios, Flávia Olegário; Angélica, Rômulo Simões; Sanjad, Thais Alessandra Bastos Caminha

    2014-10-15

    The fabrication of metallic buildings started in Europe after the Industrial Revolution in the 18th century. Metallic constructions became very popular, and started being imported by several countries, due to the facility of constructing or assembling. Belém, a northern Brazilian city, holds a great number of buildings entirely made of iron, including the Ver-o-Peso, a fish market which structures were imported from England by the end of the 19th century. This building represents a unique type of architecture and it's an important part of the city's heritage. However, research so far did not focus on its construction materials. Ver-o-Peso building's metal alloys haven't been thoroughly studied concerning physical, chemical and mineralogical characterizations. This paper aims to identify the types of metal alloys used in the building, and also corrosion products' result from weathering actions. The methods used to characterize the materials were scanning electron microscopy and X-ray diffraction. Through this research it was possible to identify four types of iron alloys used in the different parts of the building, characterize the paint coats, and determine types of corrosion. The characterization of the materials in the building allows enrolling basis for restoration processes, documenting the types of metal alloy used in architectural heritage from the 19th century, as well as understanding the advances of corrosion. - Highlights: • Ver-o-peso is a heritage building from the 19th century with unidentified alloys. • Alloy and weathering product characterization was done using SEM/EDS and XRD. • Four metal alloy types were described, indicating different types of foundries. • Weathering products showed distinct mineral phases and physical characteristics. • Original paint coats were found among corrosion products.

  6. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    SciTech Connect

    J. L. Smith

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS).

  7. Building Everyday Leadership in All Kids: An Elementary Curriculum to Promote Attitudes and Actions for Respect and Success

    ERIC Educational Resources Information Center

    MacGregor, Mariam G.

    2013-01-01

    "Building Everyday Leadership in All Kids" emphasizes that anyone can be a leader--and it's never too early to start learning what leadership means and how to lead. This resource engages all emerging leaders, at all emotional and academic levels, by taking a full, practical approach to building personal and group leadership attitudes.…

  8. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel records to accomplish a function of GAO, GAO shall, consistent with its authority, cause the requirements..., for the purposes of this part, to be an employee of GAO. Contractor employees will be required...

  9. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating...

  10. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and...

  11. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and...

  12. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and...

  13. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and...

  14. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and...

  15. 48 CFR 253.209 - Contractor qualifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications....

  16. 48 CFR 253.209 - Contractor qualifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications....

  17. 48 CFR 253.209 - Contractor qualifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications....

  18. 48 CFR 253.209 - Contractor qualifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications....

  19. 7 CFR 1726.27 - Contractor's bonds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Contractor's bonds. 1726.27 Section 1726.27 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a)...

  20. 39 CFR 230.6 - Contractor requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Contractor requirements. 230.6 Section 230.6 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION OFFICE OF INSPECTOR GENERAL General Policy and Authority § 230.6 Contractor requirements. (a) The Office of Inspector General shall be the exclusive judge of its...

  1. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Contractor employees. 199.115 Section 199.115 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing § 199.115 Contractor...

  2. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 4 Accounts 1 2013-01-01 2013-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of...

  3. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 4 Accounts 1 2014-01-01 2013-01-01 true Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of...

  4. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 4 Accounts 1 2012-01-01 2012-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of...

  5. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a...

  6. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a...

  7. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a...

  8. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a...

  9. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a...

  10. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 4 Accounts 1 2011-01-01 2011-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of...

  11. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a...

  12. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a...

  13. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a...

  14. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a...

  15. General practitioners and the independent contractor status

    PubMed Central

    Gray, D. J. Pereira

    1977-01-01

    Primary medical care can be provided either by a bureaucratic hierarchical organization or alternatively by independent contractors. Most members of the caring professions in medicine, nursing, and social work are employed in bureaucracies, whereas general medical practitioners, general dental practitioners, opticians, and pharmacists are independent contractors. The independent contractor status has recently been heavily attacked from within the medical and nursing professions, and also from outside. It has been suggested that contracting for services is an inappropriate and anomalous way of arranging medical care, which should now be stopped. However, this process of contracting for services can be analysed, using perspectives from some of the behavioural sciences, to reveal hidden depths in the independent contractor status which suggest that the provision of primary medical care is best carried out by independent contractors. PMID:616865

  16. Technical assistance contractor management plan: Surface and ground water

    SciTech Connect

    Not Available

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

  17. Building Local Leadership for Change: A National Scan of Parent Leadership Training Programs. Education Policy for Action Series

    ERIC Educational Resources Information Center

    Henderson, Anne T.

    2010-01-01

    The New York State Senate has given New York City an unprecedented opportunity--to create a Parent Training Center that will build cadres of parent leaders across all five boroughs. The legislation, which places the responsibility for the Center at the City University of New York (CUNY), mandates that the program train and support parents to…

  18. Building Local Leadership for Change: A National Scan of Parent Leadership Training Programs. Program Profiles. Education Policy for Action Series

    ERIC Educational Resources Information Center

    Henderson, Anne T.

    2010-01-01

    The program profiles presented in this paper provide background for the research report "Building Local Leadership for Change: A National Scan of Parent Leadership Training Programs." The full report describes four types of parent leadership training programs identified in the scan and gives examples of each. These four types are: (1) Parent…

  19. Building Links: Developer Initiatives for Financing Child Care. Child Care Action Campaign. CCAC Special Report #2: State Financing Alternatives Project.

    ERIC Educational Resources Information Center

    Eichman, Caroline; And Others

    This report evaluates the impact of two types of initiatives for involving real estate developers in building or supporting new child care facilities. These initiatives are: (1) linkage, a legislative mandate that requires developers to construct a child care space or contribute to a child care fund; and (2) bonuses, or zoning incentives that…

  20. Rural Community Action: Transformation of a School Building into Rental Housing for Senior Citizens in Sinclairville, New York. Bulletin 113.

    ERIC Educational Resources Information Center

    Preston, James C.; Halton, Katherine B.

    In an effort to understand the successful components of small community development projects in selected New York communities of less than 10,000 population, an analysis was made of the Sinclairville Project in Chautauqua County which rehabilitated an unused school building to function as a housing unit for senior citizens. Originally a group of…

  1. Feedback Codes and Action Plans: Building the Capacity of First-Year Students to Apply Feedback to a Scientific Report

    ERIC Educational Resources Information Center

    Bird, Fiona L.; Yucel, Robyn

    2015-01-01

    Effective feedback can build self-assessment skills in students so that they become more competent and confident to identify and self-correct weaknesses in their work. In this study, we trialled a feedback code as part of an integrated programme of formative and summative assessment tasks, which provided feedback to first-year students on their…

  2. Building Everyday Leadership in All Teens: Promoting Attitudes and Actions for Respect and Success. Curriculum Guide for Teachers and Youthworkers

    ERIC Educational Resources Information Center

    MacGregor, Mariam G.

    2006-01-01

    Every teen can be a leader. That's because leadership is not just about taking the lead in big ways, but in everyday small things, too. The sessions in this book guide teens to explore what it means to be a leader, how to work with others, ethical decision-making, risk-taking, team-building, communication, creative thinking, and more. Teens learn…

  3. Building a Student-Centred Learning Framework Using Social Software in the Middle Years Classroom: An Action Research Study

    ERIC Educational Resources Information Center

    Casey, Gail

    2013-01-01

    This article discusses the development of the online spaces that were used to create a learning framework: a student-centred framework that combined face-to-face teaching with online social and participatory media. The author, as part of her Doctoral research study, used action research as a mechanism for continual improvement as she redesigned…

  4. Building Warmth Sculpture in the Student-Teacher Relationship: Goethean Observation and Contemplative Practice in an Action Research Inquiry

    ERIC Educational Resources Information Center

    Kresin-Price, Nancy

    2013-01-01

    Through an action research approach, this dissertation focuses on the central role of interpersonal warmth in the teacher and student relationship. The heart of its inquiry is based on data gathered by a set of teachers working collaboratively as co-researchers in their own classrooms. These individuals inquired into the potential of the teacher…

  5. Building Communities of Support around a Child with Special Education Needs: The Effects of Participatory Action Research

    ERIC Educational Resources Information Center

    Lamb, Judy

    2008-01-01

    Over a period of a year, formal and informal interactions among members of the community around a four-year-old girl with special education needs were focused through participatory action research (PAR). The team included parents, kindergarten teachers, an education support worker, speech-language therapist, early intervention teacher and…

  6. 48 CFR 725.703 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-financed contract, except that they must be citizens of a Geographic Code 935 country, or non-U.S. citizens... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees....

  7. Contractor and government - Teamwork and commitment

    NASA Technical Reports Server (NTRS)

    Griffin, G. D.

    1985-01-01

    Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

  8. 48 CFR 725.703 - Contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... the contract is awarded to a U.S. firm, at least half of the supervisors, and any other specified...

  9. Acción Mutua (Shared Action): a multipronged approach to delivering capacity-building assistance to agencies serving Latino communities in the United States.

    PubMed

    Ayala, George; Chión, Miguel; Díaz, Rafael M; Heckert, Andrea L; Nuño, Monica; del Pino, Homero E; Rodríguez, Claudia; Schroeder, Kurt; Smith, Terry

    2007-01-01

    Culturally appropriate, theory-based capacity-building assistance can serve a vital role in helping HIV prevention providers remain up-to-date, effective, and responsive to those they serve. Funded by the Centers for Disease Control and Prevention (CDC), AIDS Project Los Angeles, in collaboration with San Francisco State University's César E. Chávez Institute, conducted full-day site visits and qualitative interviews in 2005 with mid-level management staff of CDC-funded community-based organizations delivering HIV prevention services to Latino communities in the western region of the United States. We found that agencies we visited (1) had not yet adapted the evidence-based interventions they were using at the time of our visit and (2) requested technical assistance and training in the areas of program development, evaluation, group facilitation techniques, consumer recruitment, client retention, intervention adaptation, and materials development. Findings from this needs assessment were used to inform our seven-pronged approach to delivering capacity-building assistance entitled "Acción Mutua" (Shared Action). The approach emphasizes strategic partnerships, stakeholder involvement, organizational self-assessment, culturally appropriate materials development, interactive training, tailored onsite technical assistance, and professional networking opportunities. This article describes our approach in detail, the assessment process we used to develop it, and its implications for capacity-building practice. PMID:17159465

  10. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    SciTech Connect

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC).

  11. Building a responsive network of support and advocacy for older African American homeless women through developmental action research.

    PubMed

    Washington, Olivia G M; Moxley, David P; Garriott, Lois; Crystal, Jennifer P

    2009-10-01

    This paper describes the Leaving Homelessness Intervention Research Project (LHIRP), a multimodal intervention that addresses the structural barriers and personal issues older African American women face in overcoming homelessness in a large mid-western city of the United States. The project incorporates a developmental action research design in partnership with homeless and formerly homeless women. Through developmental testing of interventions, LHIRP identifies promising practices at the individual, group life, intentional community, and city levels. The paper offers a rationale for the integration of both developmental research and action research, particularly community-based participatory inquiry. The authors document the nature of the helping network, identify and describe the project's aims, organizing framework, and methods that document the lived experience of homelessness. Action research strategies that support the design and intervention activities are described, as are the tools used to test promising practices that are useful in helping older women transition and remain out of homelessness. The paper identifies the knowledge products of the intervention project including lexicon, theory, and frameworks, considers the vicious cycle that serves as an advanced organizer of relevant intervention, illuminates core principles, and examines the importance of the web of affiliation that the project seeks to form among participants, staff, and technical assistants. PMID:19929159

  12. Corrective Action Plan for CAU No. 95: Area 15 EPA Farm Laboratory Building, Decontamination and Demolition Closure Activities - Nevada Test Site. Rev. 0

    SciTech Connect

    Olson, A.L.; Nacht, S.J.

    1997-11-01

    This Corrective Action Plan (CAP) provides the selected corrective action alternative and proposes the closure implementation methodology for the Environmental Protection Agency (EPA) Farm Laboratory Building 15-06 located in Area 15 of the Nevada Test Site (NTS), Nye County, Nevada. The facility is part of the Environmental Restoration Project managed by the U.S. Department of Energy/Nevada Operations Office (DOE/NV) under the Decontamination and Decommissioning (D&D) Subproject which serves to manage and dispose of surplus facilities at the NTS in a manner that will protect personnel, the public, and the environment. It is identified as Corrective Action Unit (CAU) 95 in Appendix III of the Federal Facilities Agreement and Consent Order (FFACO). In July 1997, the DOE/NV verbally requested approval from the Nevada Division of Environmental Protection (NDEP) for the closure schedule to be accelerated. Currently, field activities are anticipated to be completed by September 30, 1997. In order to meet this new schedule NDEP has agreed to review this document as expeditiously as possible. Comments will be addressed in the Closure Report after field activities have been completed, unless significant issues require resolution during closure activities.

  13. 76 FR 20661 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... approval according to the procedures prescribed in 5 CFR 1320.12. On January 25, 2011, 76 FR 4343, EPA... Conflicts of Interest AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: In compliance... electronic docket, go to http://www.regulations.gov . Title: Contractor Conflicts of Interest. ICR...

  14. 75 FR 55577 - Clean Water Act; Contractor Access to Confidential Business Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-13

    ... AGENCY Clean Water Act; Contractor Access to Confidential Business Information AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The Environmental Protection Agency's (EPA) Office of Water... of section 308 of the Clean Water Act (CWA). Some information being transferred from the pulp,...

  15. 77 FR 65927 - 60-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Notice of Proposed Information Collection: Office of Language Services Contractor Application Form ACTION...: LSApplications@state.gov . Mail: Department of State, Office of Language Services SA- 1, Fourteenth Floor, 2401 E....gov . SUPPLEMENTARY INFORMATION: Title of Information Collection: Office of Language...

  16. 48 CFR 52.247-28 - Contractor's Invoices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed...

  17. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree...

  18. 48 CFR 1252.242-71 - Contractor testimony.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony....

  19. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree...

  20. 48 CFR 1509.170-8 - Contractor Performance Report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance Report. 1509.170-8 Section 1509.170-8 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a)...

  1. Final report of the radiological release survey of Building 11 at the Grand Junction Office Facility

    SciTech Connect

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 11 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

  2. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Status of contractors as a direct contractor (Spain). 252.229-7004 Section 252.229-7004 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions...

  3. Addendum to the Closure Report for Corrective Action Unit 423: Area 3 Building 03-60 Underground Discharge Point, Tonopah Test Range, Nevada, Revision 0

    SciTech Connect

    Lynn Kidman

    2008-10-01

    This document constitutes an addendum to the July 1999, Closure Report for Corrective Action Unit 423: Area 3 Building 0360 Underground Discharge Point, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-002-0308, Underground Discharge Point. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the

  4. Building Shared Experience to Advance Practical Application of Pathway-Based Toxicology: Liver Toxicity Mode-of-Action

    PubMed Central

    Willett, Catherine; Rae, Jessica Caverly; Goyak, Katy O.; Minsavage, Gary; Westmoreland, Carl; Andersen, Melvin; Avigan, Mark; Duché, Daniel; Harris, Georgina; Hartung, Thomas; Jaeschke, Hartmut; Kleensang, Andre; Landesmann, Brigitte; Martos, Suzanne; Matevia, Marilyn; Toole, Colleen; Rowan, Andrew; Schultz, Terry; Seed, Jennifer; Senior, John; Shah, Imran; Subramanian, Kalyanasundaram; Vinken, Mathieu; Watkins, Paul

    2016-01-01

    Summary A workshop sponsored by the Human Toxicology Project Consortium (HTPC), “Building Shared Experience to Advance Practical Application of Pathway-Based Toxicology: Liver Toxicity Mode-of-Action” brought together experts from a wide range of perspectives to inform the process of pathway development and to advance two prototype pathways initially developed by the European Commission Joint Research Center (JRC): liver-specific fibrosis and steatosis. The first half of the workshop focused on the theory and practice of pathway development; the second on liver disease and the two prototype pathways. Participants agreed pathway development is extremely useful for organizing information and found that focusing the theoretical discussion on a specific AOP is helpful. It is important to include several perspectives during pathway development, including information specialists, pathologists, human health and environmental risk assessors, and chemical and product manufacturers, to ensure the biology is well captured and end use is considered. PMID:24535319

  5. Report on audit of management and operating contractor overtime costs

    SciTech Connect

    1995-10-01

    The Department of Energy (Department) uses contractors to operate its facilities. During Fiscal Year 1994, the Department`s management and operating contractors (contractors) had a total payroll of about $6.6 billion. Of this amount, about $251 million was compensation for overtime pay. The purpose of our audit was to evaluate contractor overtime payments for compliance with applicable regulations and contract provisions. Our objective was to determine whether the Department had controls in place to monitor and manage contractor overtime use.

  6. Resilience in action: an evidence-informed, theoretically driven approach to building strengths in an office-based setting.

    PubMed

    Ginsburg, Kenneth R; Carlson, Elyse C

    2011-12-01

    Positive Youth Development and resilience-based strategies designed to develop youth capabilities are promising means to reduce risky behaviors. This article focuses on applying a strengths-based approach in a health setting. It is anchored in behavioral models that propose that people make health-promoting decisions when they possess enough information to wish to change, motivation to drive them toward change, and the skill sets to take action toward and then maintain healthier behaviors. It considers how our interactions will benefit when we (1) form a trustworthy connection and health-promoting partnership, (2) use a behavioral screen that addresses risk in the context of existing strengths, (3) elicit strengths as well as challenges, (4) facilitate youth to derive their own solutions, and (5) offer teens positive coping strategies. PMID:22423460

  7. Building public trust: Actions to respond to the report of the Advisory Committee on human radiation experiments

    SciTech Connect

    1997-03-01

    Democratic government requires trust: people need to know and believe that the government is telling the truth. Without information about what the government is doing and why, citizens cannot exercise democratic control over government institutions. During his first year in office, President Clinton became concerned about reports that the government had conducted unethical secret human radiation experiments during the Cold War. To address this issue, in January 1994, President Clinton established the Advisory Committee on Human Radiation Experiments (ACHRE), chaired by bioethicist Dr. Ruth Faden of Johns Hopkins University. The President also directed all Federal agencies to search for records related to human subjects radiation research and provide them to the Advisory Committee. This report presents the Administration`s actions to respond to the ACHRE`s findings and recommendations.

  8. GPR surveying of transport infrastructures and buildings; underground utility and void sensing - ongoing activities in Working Group 2 of COST Action TU1208

    NASA Astrophysics Data System (ADS)

    Pajewski, Lara; Plati, Christina; Derobert, Xavier

    2015-04-01

    This work aims at presenting the ongoing research activities carried out in Working Group 2 'GPR surveying of pavements, bridges, tunnels and buildings; underground utility and void sensing' of the COST (European COoperation in Science and Technology) Action TU1208 'Civil Engineering Applications of Ground Penetrating Radar' (www.GPRadar.eu). The principal goal of the COST Action TU1208 is to exchange and increase scientific-technical knowledge and experience of Ground Penetrating Radar (GPR) techniques in civil engineering, whilst simultaneously promoting throughout Europe the effective use of this safe and non-destructive technique in the monitoring of infrastructures and structures. Four Working Groups (WGs) carry out the research activities. WG1 focuses on the development of innovative GPR equipment dedicated for civil engineering applications. WG2 deals with the development of guidelines and protocols for the surveying, through the use of a GPR system, of transport infrastructure and buildings, as well as for the sensing of utilities and voids. WG3 deals with the development of electromagnetic forward and inverse scattering methods, for the characterization of GPR scenarios, as well as with data- processing algorithms for the elaboration of the data collected during GPR surveys. WG4 is concerned with the use of GPR in fields different from the civil engineering, as well as with the integration of GPR with other non-destructive testing techniques. Each WG includes several Projects. WG2 includes five Projects. Project 2.1 focuses on outlining 'Innovative inspection procedures for effective GPR surveying of critical transport infrastructures (pavements, bridges and tunnels).' Project 2.2 is concerned with the development of 'Innovative inspection procedures for effective GPR surveying of buildings.' Project 2.3 deals with identifying 'Innovative inspection procedures for effective GPR sensing and mapping of underground utilities and voids, with a focus to urban

  9. Ground-based plasma contractor characterization

    NASA Technical Reports Server (NTRS)

    Patterson, Michael J.; Aadland, Randall S.

    1987-01-01

    Presented are recent NASA Lewis Research Center (LeRC) plasma contractor experimental results, as well as a description of the plasma contractor test facility. The operation of a 24 cm diameter plasma source with hollow cathode was investigated in the lighted-mode regime of electron current collection from 0.1 to 7.0 A. These results are compared to those obtained with a 12 cm plasma source. Full two-dimensional plasma potential profiles were constructed from emissive probe traces of the contractor plume. The experimentally measured dimensions of the plume sheaths were then compared to those theoretically predicted using a model of a spherical double sheath. Results are consistent for currents up to approximately 1.0 A. For currents above 1.0 A, substantial deviations from theory occur. These deviations are due to sheath asphericity, and possibly volume ionization in the double-sheath region.

  10. Building evidence for peer-led interventions: assessing the cost of the Adolescent Asthma Action program in Australia.

    PubMed

    Otim, Michael E; Jayasinha, Ranmalie; Forbes, Hayley; Shah, Smita

    2015-01-01

    Asthma is the most common chronic illness among adolescents in Australia. Aboriginal and Torres Strait Islander adolescents, in particular, face substantial inequalities in asthma-related outcomes. Triple A (Adolescent Asthma Action) is a peer-led education intervention, which aims to improve asthma self-management and reduce the uptake of smoking among adolescents. The aim of this study was to determine the cost of implementing the Triple A program in Australia. Standard economic costing methods were used. It involved identifying the resources that were utilised (such as personnel and program materials), measuring them and then valuing them. We later performed sensitivity analysis so as to identify the cost drivers and a stress test to test how the intervention can perform when some inputs are lacking. Results indicate that the estimated cost of implementing the Triple A program in five schools was $41060, assuming that the opportunity cost of all the participants and venues was accounted for. This translated to $8212 per school or $50 per target student. From sensitivity analysis and a stress test, it was identified that the cost of the intervention (in practice) was $14 per student. This appears to be a modest cost, given the burden of asthma. In conclusion, the Triple A program is an affordable intervention to implement in high schools. The potential asthma cost savings due to the program are significant. If the Triple A program is implemented nation-wide, the benefits would be substantial. PMID:25230153

  11. GPR surveying of transport infrastructures and buildings; underground utility and void sensing - ongoing activities in Working Group 2 of COST Action TU1208

    NASA Astrophysics Data System (ADS)

    Pajewski, Lara; Plati, Christina; Derobert, Xavier

    2015-04-01

    This work aims at presenting the ongoing research activities carried out in Working Group 2 'GPR surveying of pavements, bridges, tunnels and buildings; underground utility and void sensing' of the COST (European COoperation in Science and Technology) Action TU1208 'Civil Engineering Applications of Ground Penetrating Radar' (www.GPRadar.eu). The principal goal of the COST Action TU1208 is to exchange and increase scientific-technical knowledge and experience of Ground Penetrating Radar (GPR) techniques in civil engineering, whilst simultaneously promoting throughout Europe the effective use of this safe and non-destructive technique in the monitoring of infrastructures and structures. Four Working Groups (WGs) carry out the research activities. WG1 focuses on the development of innovative GPR equipment dedicated for civil engineering applications. WG2 deals with the development of guidelines and protocols for the surveying, through the use of a GPR system, of transport infrastructure and buildings, as well as for the sensing of utilities and voids. WG3 deals with the development of electromagnetic forward and inverse scattering methods, for the characterization of GPR scenarios, as well as with data- processing algorithms for the elaboration of the data collected during GPR surveys. WG4 is concerned with the use of GPR in fields different from the civil engineering, as well as with the integration of GPR with other non-destructive testing techniques. Each WG includes several Projects. WG2 includes five Projects. Project 2.1 focuses on outlining 'Innovative inspection procedures for effective GPR surveying of critical transport infrastructures (pavements, bridges and tunnels).' Project 2.2 is concerned with the development of 'Innovative inspection procedures for effective GPR surveying of buildings.' Project 2.3 deals with identifying 'Innovative inspection procedures for effective GPR sensing and mapping of underground utilities and voids, with a focus to urban

  12. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  13. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES COLLECTION, MAINTENANCE, USE, AND DISSEMINATION OF RECORDS OF...

  14. 78 FR 11164 - Policy on Contractor Profits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... Defense Acquisition Regulations System Policy on Contractor Profits AGENCY: Defense Acquisition..., at 703- 693-1145. Please cite NDAA FY 2013 Profit Policy Public Meeting. SUPPLEMENTARY INFORMATION... private sector about the requirements of section 804 of the National Defense Authorization Act for...

  15. ROTATING BIOLOGICAL CONTRACTORS - HYDRAULIC VERSUS ORGANIC LOADING

    EPA Science Inventory

    Conventional and alternative flow configurations of rotating biological contractors were compared for soluble organic carbon and ammonia-nitrogen removal. Each treatment train contained eight shafts with a cumulative surface area of 800,000 ft sq. The hydraulic bay used the conve...

  16. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Government contractors. 513.36 Section 513.36 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION ACCESS TO RECORDS Release of Information General Provisions and Procedures § 513.36...

  17. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Government contractors. 513.36 Section 513.36 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION ACCESS TO RECORDS Release of Information General Provisions and Procedures § 513.36...

  18. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Government contractors. 513.36 Section 513.36 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION ACCESS TO RECORDS Release of Information General Provisions and Procedures § 513.36...

  19. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Government contractors. 513.36 Section 513.36 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION ACCESS TO RECORDS Release of Information General Provisions and Procedures § 513.36...

  20. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Government contractors. 513.36 Section 513.36 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION ACCESS TO RECORDS Release of Information General Provisions and Procedures § 513.36...

  1. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Contractor responsibilities. 46.105 Section 46.105 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION...— (1) Manufacturing processes, to ensure that the product is produced to, and meets, the...

  2. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Contractor responsibilities. 46.105 Section 46.105 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION...— (1) Manufacturing processes, to ensure that the product is produced to, and meets, the...

  3. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Contractor responsibilities. 46.105 Section 46.105 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION...— (1) Manufacturing processes, to ensure that the product is produced to, and meets, the...

  4. Final report of the radiological release survey of Building 54 at the Grand Junction Office Facility

    SciTech Connect

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 54 and the underlying soil were found not to be radiologically contaminated, and can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual release report for each GJO building.

  5. Strengthening the Workforce in Better Buildings Neighborhoods

    SciTech Connect

    Sperling, Gil; Adams, Cynthia; Fiori, Laura; Penzkover, Dave; Wood, Danny; Farris, Joshua

    2012-01-01

    The Better Buildings Neighborhood Program is supporting an expanding energy efficiency workforce upgrading buildings in communities around the country. Contractors are being trained and have access to additional job opportunities, spurring local economic growth while helping Americans use less energy, save money, and be more comfortable in their homes and other buildings.

  6. Punch List Process Concludes Building Project.

    ERIC Educational Resources Information Center

    Roark, Steven

    2002-01-01

    The fourteenth article in a series following a single building project (the expansion and renovation of Longview Community College's Liberal Arts Building), describes the punch list process that concludes every building project. This list delineates issues for the contractor that, when addressed, transfer responsibility to the owner. (EV)

  7. Strengthening the Workforce in Better Buildings Neighborhoods

    ScienceCinema

    Sperling, Gil; Adams, Cynthia; Fiori, Laura; Penzkover, Dave; Wood, Danny; Farris, Joshua

    2013-05-29

    The Better Buildings Neighborhood Program is supporting an expanding energy efficiency workforce upgrading buildings in communities around the country. Contractors are being trained and have access to additional job opportunities, spurring local economic growth while helping Americans use less energy, save money, and be more comfortable in their homes and other buildings.

  8. Management of government personal property in the hands of contractors. Handbook for contracting officers and staff

    SciTech Connect

    Not Available

    1982-04-01

    This manual is divided into three parts. Part One applies to the management of Government personal property within the Department of Energy in general terms. Part Two describes the specifics of the application of personal property management techniques to On-Site Contractors. Part three applies to Off-Site Contractors. Part One introduces the field of property management. It discusses: the legal basis and requirements established by Federal Statutes and the parallel authorities and responsibilities; the related evolution of the Department of Energy; the regulation system within the Federal Government and its implementation by the Department for personal property management. The life cycle of equipment is presented and how control over personal property is maintained through an accountability system. Classifications of property and contract clauses are discussed. The relationships of contracting officers and property administrators with contractors are presented in each of the discussions as appropriate. Part One consists of only one chapter and is applicable to the management of property utilized by all types of contractors. It provides the foundation to explore in some detail the actions and interactions that occur between the Department's procurement and property personnel and those of the contractor. This exploration in depth is made in Parts Two and Three.

  9. 41 CFR 60-741.44 - Required contents of affirmative action programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... establish meaningful contacts with appropriate social service agencies, organizations of and for individuals..., recreational and social activities. (v) Measure the contractor's compliance with the affirmative action...

  10. 48 CFR 1845.7210 - Contractor utilization of Government property.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor utilization of Government property. 1845.7210 Section 1845.7210 Federal Acquisition Regulations System NATIONAL AERONAUTICS....7210 Contractor utilization of Government property....

  11. 48 CFR 645.608 - Screening of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... inventory. 645.608 Section 645.608 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 645.608 Screening of contractor inventory....

  12. 42 CFR 455.202 - Limitation on contractor liability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Limitation on contractor liability. 455.202 Section 455.202 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN... § 455.202 Limitation on contractor liability. (a) A program contractor, a person, or an entity...

  13. 42 CFR 421.304 - Medicare integrity program contractor functions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Medicare integrity program contractor functions... AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM MEDICARE CONTRACTING Medicare Integrity Program Contractors § 421.304 Medicare integrity program contractor functions. The contract between CMS and a...

  14. 20 CFR 655.19 - Job contractor filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Job contractor filing requirements. 655.19... States (H-2B Workers) Application for Temporary Employment Certification Filing Procedures § 655.19 Job contractor filing requirements. (a) Provided that a job contractor and any employer-client are...

  15. 20 CFR 655.19 - Job contractor filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 3 2014-04-01 2014-04-01 false Job contractor filing requirements. 655.19... States (H-2B Workers) Application for Temporary Employment Certification Filing Procedures § 655.19 Job contractor filing requirements. (a) Provided that a job contractor and any employer-client are...

  16. 20 CFR 655.19 - Job contractor filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 3 2013-04-01 2013-04-01 false Job contractor filing requirements. 655.19... States (H-2B Workers) Application for Temporary Employment Certification Filing Procedures § 655.19 Job contractor filing requirements. (a) Provided that a job contractor and any employer-client are...

  17. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: CONTRACTOR BUSINESS SYSTEMS (MAY 2011) (a) Definitions. As used in this...

  18. 48 CFR 18.102 - Central contractor registration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... registration. 18.102 Section 18.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Central contractor registration. Contractors are not required to be registered in the Central Contractor Registration (CCR) for contracts awarded to support unusual and compelling needs or emergency...

  19. 48 CFR 752.7013 - Contractor-mission relationships.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... relationships. 752.7013 Section 752.7013 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is...

  20. 48 CFR 18.102 - Central contractor registration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... registration. 18.102 Section 18.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Central contractor registration. Contractors are not required to be registered in the Central Contractor Registration (CCR) for contracts awarded to support unusual and compelling needs or emergency...

  1. 42 CFR 405.1831 - Contractor hearing decision.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... based on the evidence from the contractor hearing (as described in § 405.1823 of this subpart) and other... interpretive rules, general statements of policy, and rules of agency organization, procedure, or practice... contractor's denial of the relief that the provider seeks before the contractor hearing officer(s) was...

  2. 6 CFR 25.8 - Government contractor Defense.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 6 Domestic Security 1 2013-01-01 2013-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification,...

  3. 48 CFR 2452.251-70 - Contractor employee travel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT...

  4. 48 CFR 245.608 - Screening of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory....

  5. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Composition of the... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one...

  6. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Composition of the... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one...

  7. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Composition of the... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one...

  8. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Composition of the... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one...

  9. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Composition of the... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one...

  10. Needs of Non-Energy Focused Contractors

    SciTech Connect

    Liakus, C.

    2012-12-01

    To better understand the informational needs of non-energy focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  11. Needs of Non Energy-Focused Contractors

    SciTech Connect

    Liaukus, C.

    2012-12-01

    To better understand the informational needs of non energy-focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  12. Tank waste remediation system (TWRS) privatization contractor samples waste envelope D material 241-C-106

    SciTech Connect

    Esch, R.A.

    1997-04-14

    This report represents the Final Analytical Report on Tank Waste Remediation System (TWRS) Privatization Contractor Samples for Waste Envelope D. All work was conducted in accordance with ''Addendum 1 of the Letter of Instruction (LOI) for TWRS Privatization Contractor Samples Addressing Waste Envelope D Materials - Revision 0, Revision 1, and Revision 2.'' (Jones 1996, Wiemers 1996a, Wiemers 1996b) Tank 241-C-1 06 (C-106) was selected by TWRS Privatization for the Part 1A Envelope D high-level waste demonstration. Twenty bottles of Tank C-106 material were collected by Westinghouse Hanford Company using a grab sampling technique and transferred to the 325 building for processing by the Pacific Northwest National Laboratory (PNNL). At the 325 building, the contents of the twenty bottles were combined into a single Initial Composite Material. This composite was subsampled for the laboratory-scale screening test and characterization testing, and the remainder was transferred to the 324 building for bench-scale preparation of the Privatization Contractor samples.

  13. Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation

    SciTech Connect

    Rowsell, David Leon

    2015-06-01

    This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.

  14. 41 CFR 60-4.4 - Affirmative action requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Affirmative action... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.4 Affirmative action requirements. (a) To implement the affirmative action requirements of Executive Order 11246 in the...

  15. 41 CFR 60-741.43 - Affirmative action policy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Affirmative action policy... OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.43 Affirmative action...

  16. 41 CFR 60-741.43 - Affirmative action policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Affirmative action... OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.43 Affirmative action...

  17. 41 CFR 60-741.43 - Affirmative action policy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Affirmative action policy... OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.43 Affirmative action...

  18. 41 CFR 60-300.43 - Affirmative action policy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Affirmative action policy... OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS... MEDAL VETERANS Affirmative Action Program § 60-300.43 Affirmative action policy. Under the...

  19. 41 CFR 60-4.4 - Affirmative action requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 1 2014-07-01 2014-07-01 false Affirmative action... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.4 Affirmative action requirements. (a) To implement the affirmative action requirements of Executive Order 11246 in the...

  20. 41 CFR 60-250.43 - Affirmative action policy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Affirmative action policy... OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS... PROTECTED VETERANS Affirmative Action Program § 60-250.43 Affirmative action policy. Under the...

  1. 41 CFR 60-250.43 - Affirmative action policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Affirmative action... OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS... PROTECTED VETERANS Affirmative Action Program § 60-250.43 Affirmative action policy. Under the...

  2. 41 CFR 60-300.43 - Affirmative action policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Affirmative action... OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS... MEDAL VETERANS Affirmative Action Program § 60-300.43 Affirmative action policy. Under the...

  3. 41 CFR 60-250.43 - Affirmative action policy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Affirmative action policy... OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS... PROTECTED VETERANS Affirmative Action Program § 60-250.43 Affirmative action policy. Under the...

  4. 41 CFR 60-4.4 - Affirmative action requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Affirmative action... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.4 Affirmative action requirements. (a) To implement the affirmative action requirements of Executive Order 11246 in the...

  5. 41 CFR 60-300.43 - Affirmative action policy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Affirmative action policy... OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS... MEDAL VETERANS Affirmative Action Program § 60-300.43 Affirmative action policy. Under the...

  6. 41 CFR 60-4.4 - Affirmative action requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Affirmative action... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.4 Affirmative action requirements. (a) To implement the affirmative action requirements of Executive Order 11246 in the...

  7. 41 CFR 60-300.43 - Affirmative action policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Affirmative action policy... OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS... MEDAL VETERANS Affirmative Action Program § 60-300.43 Affirmative action policy. Under the...

  8. 41 CFR 60-741.43 - Affirmative action policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Affirmative action policy... OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.43 Affirmative action...

  9. 41 CFR 60-4.4 - Affirmative action requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Affirmative action... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.4 Affirmative action requirements. (a) To implement the affirmative action requirements of Executive Order 11246 in the...

  10. 41 CFR 60-250.43 - Affirmative action policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Affirmative action policy... OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS... PROTECTED VETERANS Affirmative Action Program § 60-250.43 Affirmative action policy. Under the...

  11. Court denies review of contractor/utility feud: contractors fear denial sets precedent

    SciTech Connect

    Poplett, J.

    1986-02-03

    On Jan. 27, the US Supreme Court refused to review a recent federal circuit court decision allowing a California public utility to enter into energy-related contractor activities; this may set a precedent for future related cases, according to an attorney for the contractor plaintiffs. The Supreme Court's refusal lets stand the 9th Federal Circuit Court of Appeals decision on Grason Electric Co. et al. vs. the Sacramento Municipal Utility District (SMUD). That decision allows SMUD - a public utility - to engage in energy-related businesses such as the installation of energy management systems and lighting retrofits, according to the attorney. The plaintiffs in the case, 13 electrical contractors in the Sacramento area, originally brought the case against SMUD on antitrust grounds because, they alleged, the utility was encroaching upon their businesses.

  12. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    SciTech Connect

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedial action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.

  13. Final report of the decontamination and decommissioning of Building 18 at the Grand Junction Projects Office Facility

    SciTech Connect

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. The soil beneath Building 18 was found to be radiologically contaminated; the building was not contaminated. The soil was remediated in accordance with identified standards. Building 18 and the underlying soil can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  14. Energy Renovations: Volume 17: Insulation - A Guide for Contractors to Share with Homeowners

    SciTech Connect

    Baechler, Michael C.; Adams, Karen; Hefty, Marye G.; Gilbride, Theresa L.; Love, Pat M.

    2012-05-15

    This report was prepared by PNNL for DOE's Building America program and is intended as a guide that energy performance contractors can share with homeowners to describe various insulation options for improving the energy performance and comfort of existing homes. The report provides descriptions of many common insulation types, including their advantages and disadvantages, R-values, characteristics, and typical uses. The report also describes potentially hazardous products such as asbestos and formaldehyde and safety issues when conducting energy-efficient upgrades including radon. The guide is available for download at the DOE Building America website, www.buildingamerica.gov.

  15. 41 CFR 61-300.10 - What reporting requirements apply to Federal contractors and subcontractors, and what specific...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... opportunity action clause required by 41 CFR 60-300.5. The reporting requirements clause is as follows... 41 CFR 60-300.42, voluntary self-disclosures by covered incumbent veterans, or actual knowledge of an... reported by completing the form entitled “Federal Contractor Veterans” Employment Report VETS-100A.”...

  16. 41 CFR 61-250.10 - What reporting requirements apply to Federal contractors and subcontractors, and what specific...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... opportunity action clause required by 41 CFR 60-250.5. The reporting requirements clause is as follows... applicants to self-identify in accordance with 41 CFR 60-250.42, voluntary self-disclosures by protected... “Federal Contractor Veterans' Employment Report VETS-100.” (c) VETS-100 reports must be submitted no...

  17. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    SciTech Connect

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.

  18. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... commensurate with contingent import tax and duty-free liability. This bank guaranty or fund shall not be released to the Contractor until the Spanish General Directorate of Customs verifies the accounting, export... DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION...

  19. Health and Safety Guide for Home Performance Contractors

    SciTech Connect

    Stratton, Chris; Walker, Iain S.

    2012-02-15

    This report is intended to provide home performance contractor trainers with a resource to keep both their workers and home residents safe and healthy. This document is an attempt to describe what we currently believe is safe, what we believe is unsafe, and what we’re unsure about. It is intended to identify health and safety issues and provide historical context and current understanding of both risks and mitigation strategies. In addition, it provides links to more in-depth resources for each issue. When we tighten the thermal envelope of a house to improve comfort and reduce energy use, we have to be sure that we are not compromising the indoor air quality of the home. This means identifying and mitigating or eliminating pollution sources before and after you make changes to the home. These sources can include materials and finishes in the home, exhaust gasses from combustion appliances, soil gasses such as radon, and moisture from a bathroom, kitchen, or unvented clothes dryer. Our first responsibility is to do no harm — this applies both to our clients and to our employees. Currently, there are many new products that are widely used but whose health effects are not well understood. Our in ability to have perfect information means the directive to do no harm can be difficult to obey. Each home is a little bit different, and in the face of a situation you’ve never encountered, it’s important to have a solid grasp of the fundamental concepts of building science when the hard and fast rules don’t apply . The home performance industry is gaining momentum, and has the potential to expand greatly as energy costs continue to rise. It is imperative that we remain vigilant about protecting the health and safety of our workers and our customers. It only takes a few news stories about a family that got sick after their home was tightened by a home performance contractor to scare off potential customers and taint the reputation of the entire industry. Good

  20. The contractor`s role in low-level waste disposal facility application review and licensing

    SciTech Connect

    Serie, P.J.; Dressen, A.L.

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department in a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.

  1. Hospital-based physicians--independent contractor or ?

    PubMed

    Frank, B H

    1997-01-01

    The attack by the Internal Revenue Service on the classification of workers who operate as independent contractors has continued unabated over the last nine years, and despite increased congressional concern regarding the Internal Revenue Service's handling of independent contractor audits, every business that utilizes the services of independent contractors should assume that they, in time, will be audited by the Internal Revenue Service. PMID:10167588

  2. Analysis of institutional mechanisms affecting residential and commercial buildings retrofit

    SciTech Connect

    Not Available

    1980-09-01

    Barriers to energy conservation in the residential and commercial sectors influence (1) the willingness of building occupants to modify their energy usage habits, and (2) the willingness of building owners/occupants to upgrade the thermal characteristics of the structures within which they live or work and the appliances which they use. The barriers that influence the willingness of building owners/occupants to modify the thermal efficiency characteristics of building structures and heating/cooling systems are discussed. This focus is further narrowed to include only those barriers that impede modifications to existing buildings, i.e., energy conservation retrofit activity. Eight barriers selected for their suitability for Federal action in the residential and commercial sectors and examined are: fuel pricing policies that in the short term do not provide enough incentive to invest in energy conservation; high finance cost; inability to evaluate contractor performance; inability to evaluate retrofit products; lack of well-integrated or one-stop marketing systems (referred to as lack of delivery systems); lack of precise or customized information; lack of sociological/psychological incentives; and use of the first-cost decision criterion (expanded to include short-term payback criterion for the commercial sector). The impacts of these barriers on energy conservation are separately assessed for the residential and commercial sectors.

  3. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAMS ENVIRONMENT, CONSERVATION, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition... sustainable products and services by its facility support contractors. The DOE Sustainable Acquisition...

  4. 75 FR 69037 - Medicaid Program; Recovery Audit Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-10

    ... rule proposes that States and Medicaid RACs coordinate with other contractors and entities auditing... Federal entities. In addition to the obligation to coordinate auditing efforts to reduce the...

  5. The impact of customer-contractor interactions on spacecraft innovation: Insights from communication satellite history

    NASA Astrophysics Data System (ADS)

    Szajnfarber, Zoe; Stringfellow, Margaret V.; Weigel, Annalisa L.

    2010-11-01

    This paper captures a first detailed attempt to quantitatively analyze the innovation history of the space sector. Building on a communication satellite innovation metric and a spacecraft innovation framework developed as part of an ongoing project, this paper presents a preliminary model of global communication satellite innovation. In addition to innovation being a function of the rate of performance normalized by price, innovation was found to be strongly influenced by characteristics of the customer-contractor contractual relationship. Specifically, Department of Defense contracts tend to result in a lower level of innovation on average as compared to other customers. Also, particular customer-contractor pairs perform differently and exhibit a second order relationship in time.

  6. Remedial Action Contacts Directory - 1997

    SciTech Connect

    1997-05-01

    This document, which was prepared for the US Department of Energy (DOE) Office of Environmental Restoration (ER), is a directory of 2628 individuals interested or involved in environmental restoration and/or remedial actions at radioactively contaminated sites. This directory contains a list of mailing addresses and phone numbers of DOE operations, area, site, project, and contractor offices; an index of DOE operations, area, site, project, and contractor office sorted by state; a list of individuals, presented by last name, facsimile number, and e-mail address; an index of affiliations presented alphabetically, with individual contacts appearing below each affiliation name; and an index of foreign contacta sorted by country and affiliation. This document was generated from the Remedial Action Contacts Database, which is maintained by the Remedial Action Program Information Center (RAPIC).

  7. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    SciTech Connect

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  8. Legal issues in environmental contractor liability

    SciTech Connect

    Slap, A.J.

    1994-12-31

    Business is booming for environmental professionals. Increasingly, environmental consultants and engineers are called upon by property owners and government agencies to clean up contaminated sites, assess environmental risk for potential purchasers and lenders, and investigate the extent of contamination prior to a real estate purchase. But these activities are not risk-free for the environmental professional. To the contrary, there are many ways for a remediation or site assessment to go awry. Risks that the remediation contractor face include the possibility that activities on the site may actually cause or contribute to further releases of the hazardous substances sought to be remediated. Because environmental professionals many times face substantial risk in performing their jobs, it is necessary that they understand and appreciate the potential liabilities when something does go wrong, and how to best protect themselves. This article describes the types of legal theories that could be brought against environmental professionals and how to best protect yourself from such liability.

  9. Contractor and Government: Teamwork and Commitment

    NASA Technical Reports Server (NTRS)

    Griffin, Gerald D.

    1984-01-01

    The assigned topic, "Contractor and Government: Teamwork and Commitment," is a subject about vitally interested. The successes of the U.S. space program were built on such teamwork and commitment. It seems only a short time ago that man's role in space was an unknown quantity. In rapid succession, however, the flights of Shepard, Glenn, and Armstrong demonstrated man's capability to live and travel in space. Consequently, we no longer live with the same awe of space. The success of these joint industry-NASA efforts in achieving our Nation's space goals testifies to the validity of our team's past commitment, management expertise, communications techniques, and teamwork over a period of 25 years. Today, however, We are at the beginning of a new era in space.

  10. 76 FR 39015 - Contractor Performance Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... ``significant regulatory action'' under the terms of Executive Order (EO) 12866 (58 FR 51735, October 4, 1993... 13175 (65 FR 67249, November 9, 2000). Thus, Executive Order 13175 does not apply to this action. In the... EPA interprets EO 13045 (62 FR 19885, April 23, 1997) as applying only to those regulatory...

  11. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    SciTech Connect

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  12. UMTRA project technical assistance contractor quality assurance implementation plan

    SciTech Connect

    Not Available

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

  13. 41 CFR 60-741.43 - Affirmative action policy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 1 2014-07-01 2014-07-01 false Affirmative action... OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.43 Affirmative...

  14. 41 CFR 60-300.43 - Affirmative action policy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 1 2014-07-01 2014-07-01 false Affirmative action... OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF FEDERAL CONTRACTORS AND... VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS Affirmative Action Program § 60-300.43 Affirmative...

  15. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... award of subcontracts consistent with this clause and 48 CFR subpart 970.44. The Contractor's purchasing... Energy (DOE) in accordance with 48 CFR 970.4401-1. The Contractor shall maintain file documentation which... Reviews in accordance with 48 CFR subpart 44.3, or, when approved by the Contracting Officer, through...

  16. 10 CFR 820.13 - Direction to NNSA contractors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Direction to NNSA contractors. 820.13 Section 820.13 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES General § 820.13 Direction to NNSA contractors. (a) Notwithstanding any other provision of this part, and pursuant to section 3213...

  17. 10 CFR 824.16 - Direction to NNSA contractors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Direction to NNSA contractors. 824.16 Section 824.16 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR THE ASSESSMENT OF CIVIL PENALTIES FOR CLASSIFIED INFORMATION SECURITY VIOLATIONS § 824.16 Direction to NNSA contractors. (a) Notwithstanding any...

  18. 10 CFR 851.45 - Direction to NNSA contractors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Direction to NNSA contractors. 851.45 Section 851.45 Energy DEPARTMENT OF ENERGY WORKER SAFETY AND HEALTH PROGRAM Enforcement Process § 851.45 Direction to NNSA contractors. (a) Notwithstanding any other provision of this part, the NNSA Administrator,...

  19. 10 CFR 820.13 - Direction to NNSA contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Direction to NNSA contractors. 820.13 Section 820.13 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES General § 820.13 Direction to NNSA contractors. (a) Notwithstanding any other provision of this part, and pursuant to section 3213...

  20. 10 CFR 851.45 - Direction to NNSA contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Direction to NNSA contractors. 851.45 Section 851.45 Energy DEPARTMENT OF ENERGY WORKER SAFETY AND HEALTH PROGRAM Enforcement Process § 851.45 Direction to NNSA contractors. (a) Notwithstanding any other provision of this part, the NNSA Administrator,...

  1. 10 CFR 824.16 - Direction to NNSA contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Direction to NNSA contractors. 824.16 Section 824.16 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR THE ASSESSMENT OF CIVIL PENALTIES FOR CLASSIFIED INFORMATION SECURITY VIOLATIONS § 824.16 Direction to NNSA contractors. (a) Notwithstanding any...

  2. 48 CFR 36.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION...

  3. 48 CFR 2936.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 2936.201 Section 2936.201 Federal Acquisition Regulations System DEPARTMENT OF LABOR...

  4. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance Evaluation. 8.406-7 Section 8.406-7 Federal Acquisition Regulations System FEDERAL ACQUISITION...

  5. 3 CFR - Addressing Tax Delinquency by Government Contractors

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 3 The President 1 2011-01-01 2011-01-01 false Addressing Tax Delinquency by Government Contractors Presidential Documents Other Presidential Documents Memorandum of January 20, 2010 Addressing Tax Delinquency by Government Contractors Memorandum for the Heads of Executive Departments and Agencies The Federal Government pays more than half...

  6. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Accounting Standards under 41 U.S.C. chapter 15, as implemented in regulations found at 48 CFR 9903.201-1... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this...

  7. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Accounting Standards under 41 U.S.C. chapter 15, as implemented in regulations found at 48 CFR 9903.201-1... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this...

  8. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... regulations found at 48 CFR 9903.201-1 (see the FAR Appendix). (b) Definitions. As used in this clause... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001,...

  9. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... regulations found at 48 CFR 9903.201-1 (see the FAR Appendix). (b) Definitions. As used in this clause... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001,...

  10. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Accounting Standards under 41 U.S.C. chapter 15, as implemented in regulations found at 48 CFR 9903.201-1... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business system... BUSINESS SYSTEMS 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this...

  11. 42 CFR 426.417 - Contractor's statement regarding new evidence.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... evidence submitted with an amended complaint; (3) New evidence produced during discovery; (4) New evidence... 42 Public Health 3 2010-10-01 2010-10-01 false Contractor's statement regarding new evidence. 426... COVERAGE DETERMINATIONS Review of an LCD § 426.417 Contractor's statement regarding new evidence. (a)...

  12. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of...

  13. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of...

  14. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of...

  15. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... award of subcontracts consistent with this clause and 48 CFR subpart 970.44. The Contractor's purchasing... Energy (DOE) in accordance with 48 CFR 970.4401-1. The Contractor shall maintain file documentation which... Reviews in accordance with 48 CFR subpart 44.3, or, when approved by the Contracting Officer, through...

  16. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... award of subcontracts consistent with this clause and 48 CFR subpart 970.44. The Contractor's purchasing... Energy (DOE) in accordance with 48 CFR 970.4401-1. The Contractor shall maintain file documentation which... Reviews in accordance with 48 CFR subpart 44.3, or, when approved by the Contracting Officer, through...

  17. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... award of subcontracts consistent with this clause and 48 CFR subpart 970.44. The Contractor's purchasing... Energy (DOE) in accordance with 48 CFR 970.4401-1. The Contractor shall maintain file documentation which... Reviews in accordance with 48 CFR subpart 44.3, or, when approved by the Contracting Officer, through...

  18. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... award of subcontracts consistent with this clause and 48 CFR subpart 970.44. The Contractor's purchasing... Energy (DOE) in accordance with 48 CFR 970.4401-1. The Contractor shall maintain file documentation which... Reviews in accordance with 48 CFR subpart 44.3, or, when approved by the Contracting Officer, through...

  19. 48 CFR 227.7108 - Contractor data repositories.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... repositories. 227.7108 Section 227.7108 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established when permitted by agency procedures. The contractual instrument establishing the data repository...

  20. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Energy Acquisition Regulation (DEAR) (76 FR 81408). The comment period is reopened until March 16, 2012... published a NOPR in the Federal Register (76 FR 81408) to revise existing regulations covering contractor... Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal Management Requirements;...

  1. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of...

  2. Productivity: The View of a Private Human Resources Contractor.

    ERIC Educational Resources Information Center

    Lavisky, Saul

    Military training parallels vocational education in that both systems are preparing students for specific jobs, and both systems are concerned with the productivity of that training, i.e., how effective training is. A private human resource contractor provided training help to the Army for two programs: TRAINFIRE, in which the contractor provided…

  3. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising....

  4. 48 CFR 1646.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 1646.301 Contractor...

  5. 48 CFR 45.501 - Prime contractor alternate locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor alternate locations. The property administrator assigned to the prime contract may request support...

  6. 48 CFR 52.204-7 - Central Contractor Registration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (CCR) database means the primary Government repository for Contractor information required for the...) for the same concern. Registered in the CCR database means that— (1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and (2)...

  7. 48 CFR 52.204-7 - Central Contractor Registration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CCR) database means the primary Government repository for Contractor information required for the...) for the same concern. Registered in the CCR database means that— (1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and (2)...

  8. 48 CFR 52.204-7 - Central Contractor Registration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (CCR) database means the primary Government repository for Contractor information required for the...) for the same concern. Registered in the CCR database means that— (1) The Contractor has entered all... Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into the CCR database;...

  9. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the... secret in the interest of national defense or foreign policy. b. Work under this contract may involve... transfer, completion of a project retirement or termination of employment. g. The Contractor shall...

  10. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the... secret in the interest of national defense or foreign policy. b. Work under this contract may involve... transfer, completion of a project retirement or termination of employment. g. The Contractor shall...

  11. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the... secret in the interest of national defense or foreign policy. b. Work under this contract may involve... transfer, completion of a project retirement or termination of employment. g. The Contractor shall...

  12. 48 CFR 53.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Responsible prospective... (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209-1 Responsible prospective contractors. (a) SF 1403 (Rev. 9/88), Preaward Survey of Prospective Contractor (General). SF 1403 is authorized...

  13. 42 CFR 405.1825 - Witnesses at contractor hearing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 2 2014-10-01 2014-10-01 false Witnesses at contractor hearing. 405.1825 Section 405.1825 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN... Determinations and Appeals § 405.1825 Witnesses at contractor hearing. The hearing officer(s) may examine...

  14. 48 CFR 225.370 - Contractors performing private security functions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractors performing private security functions. 225.370 Section 225.370 Federal Acquisition Regulations System DEFENSE... Performed Outside the United States 225.370 Contractors performing private security functions....

  15. 48 CFR 225.370 - Contractors performing private security functions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractors performing private security functions. 225.370 Section 225.370 Federal Acquisition Regulations System DEFENSE... Performed Outside the United States 225.370 Contractors performing private security functions....

  16. 48 CFR 225.370 - Contractors performing private security functions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractors performing private security functions. 225.370 Section 225.370 Federal Acquisition Regulations System DEFENSE... Performed Outside the United States 225.370 Contractors performing private security functions....

  17. 48 CFR 2132.170 - Recurring premium payments to Contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Recurring premium payments... REQUIREMENTS CONTRACT FINANCING General 2132.170 Recurring premium payments to Contractors. (a) OPM will make... specified in the contract. The annual premium to the Contractor, based on this estimate, will be credited...

  18. 48 CFR 2132.170 - Recurring premium payments to Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Recurring premium payments... REQUIREMENTS CONTRACT FINANCING General 2132.170 Recurring premium payments to Contractors. (a) OPM will make... specified in the contract. The annual premium to the Contractor, based on this estimate, will be credited...

  19. 48 CFR 2132.170 - Recurring premium payments to Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Recurring premium payments... REQUIREMENTS CONTRACT FINANCING General 2132.170 Recurring premium payments to Contractors. (a) OPM will make... specified in the contract. The annual premium to the Contractor, based on this estimate, will be credited...

  20. 48 CFR 2132.170 - Recurring premium payments to Contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Recurring premium payments... REQUIREMENTS CONTRACT FINANCING General 2132.170 Recurring premium payments to Contractors. (a) OPM will make... specified in the contract. The annual premium to the Contractor, based on this estimate, will be credited...

  1. 48 CFR 970.4402 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing system. 970.4402 Section 970.4402 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor...

  2. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 1 2011-04-01 2011-04-01 false Disclosure to contractors. 20.90 Section 20.90 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PUBLIC INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise exempt from public disclosure may...

  3. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 1 2013-04-01 2013-04-01 false Disclosure to contractors. 20.90 Section 20.90 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PUBLIC INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise exempt from public disclosure may...

  4. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 1 2014-04-01 2014-04-01 false Disclosure to contractors. 20.90 Section 20.90 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PUBLIC... exempt from public disclosure may be disclosed to contractors with the Food and Drug Administration...

  5. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 1 2012-04-01 2012-04-01 false Disclosure to contractors. 20.90 Section 20.90 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PUBLIC... exempt from public disclosure may be disclosed to contractors with the Food and Drug Administration...

  6. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Disclosure to contractors. 20.90 Section 20.90 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PUBLIC... exempt from public disclosure may be disclosed to contractors with the Food and Drug Administration...

  7. 48 CFR 245.105 - Contractor's property management system compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractor's property management system compliance. The assigned property administrator shall perform... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor's...

  8. 48 CFR 245.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractors' property management system compliance. (a) Definitions— (1) Acceptable property management system and property management system are defined in the clause at 252.245-7003, Contractor...

  9. 48 CFR 245.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractors' property management system compliance. (a) Definitions— (1) Acceptable property management system and property management system are defined in the clause at 252.245-7003, Contractor...

  10. 48 CFR 245.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractors' property management system compliance. (a) Definitions— (1) Acceptable property management system and property management system are defined in the clause at 252.245-7003, Contractor...

  11. 48 CFR 245.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractors' property management system compliance. (a) Definitions— (1) Acceptable property management system and property management system are defined in the clause at 252.245-7003, Contractor...

  12. 4 CFR 75.1 - Contractors' and vendors' certificates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Contractors' and vendors' certificates. 75.1 Section 75.1 Accounts GOVERNMENT ACCOUNTABILITY OFFICE STANDARDIZED FISCAL PROCEDURES CERTIFICATES AND APPROVALS OF BASIC VOUCHERS AND INVOICES § 75.1 Contractors' and vendors' certificates. (a) The Government Accountability Office no longer requires that...

  13. 48 CFR 642.1503-70 - Contractor Performance System (CPS).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 642.1503... allowing contracting officers to input past performance information and view past performance information... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor...

  14. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... regulations found at 48 CFR 9903.201-1 (see the FAR Appendix). (b) Definitions. As used in this clause... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001,...

  15. 48 CFR 227.7203-11 - Contractor procedures and records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that...

  16. 48 CFR 227.7203-11 - Contractor procedures and records.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that...

  17. 48 CFR 227.7203-11 - Contractor procedures and records.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that...

  18. 48 CFR 227.7203-11 - Contractor procedures and records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that...

  19. 48 CFR 227.7203-11 - Contractor procedures and records.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that...

  20. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Government-Contractor Relations. 1552.237-76 Section 1552.237-76 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following...

  1. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Government-Contractor Relations. 1552.237-76 Section 1552.237-76 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following...

  2. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Government-Contractor Relations. 1552.237-76 Section 1552.237-76 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following...

  3. 48 CFR 1845.610 - Sale of surplus contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Sale of surplus contractor inventory. 1845.610 Section 1845.610 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Inventory 1845.610 Sale of surplus contractor inventory....

  4. 6 CFR 25.8 - Government contractor Defense.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 6 Domestic Security 1 2014-01-01 2014-01-01 false Government contractor Defense. 25.8 Section 25.8 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY REGULATIONS TO SUPPORT ANTI-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria...

  5. 6 CFR 25.8 - Government contractor Defense.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 6 Domestic Security 1 2012-01-01 2012-01-01 false Government contractor Defense. 25.8 Section 25.8 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY REGULATIONS TO SUPPORT ANTI-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria...

  6. 42 CFR 405.1807 - Effect of contractor determination.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 2 2014-10-01 2014-10-01 false Effect of contractor determination. 405.1807 Section 405.1807 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN... Determinations and Appeals § 405.1807 Effect of contractor determination. The determination shall be final...

  7. Guideline for the preparation of a contractor safety plan

    SciTech Connect

    Stinnett, L

    1982-04-01

    This document is only a guideline for contractors to use in formalizing a safety program or preparing a safety plan. It contains a format of a suggested safety plan as well as pertinent safety elements which should be considered for inclusion. However, consideration of only those items listed may not be sufficient. Each contractor should include in the safety plan particular reference to those elements peculiar to the inherent hazards of the contractor's specific type of construction services, whether the hazard is shown in the list of safety elements or not. Each safety plan should be reviewed annually by the contractor's management. Reissue of the safety plan is mandatory if safety requirements have changed, or if the contractor's address or management (approval signature) has changed.

  8. 29 CFR 500.60 - Farm labor contractors' recruitment, contractual and general obligations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 3 2013-07-01 2013-07-01 false Farm labor contractors' recruitment, contractual and... of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm Labor Contracting Activities Additional Obligations of Farm Labor Contractors and Farm Labor Contractor Employees § 500.60...

  9. 29 CFR 500.60 - Farm labor contractors' recruitment, contractual and general obligations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 3 2012-07-01 2012-07-01 false Farm labor contractors' recruitment, contractual and... of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm Labor Contracting Activities Additional Obligations of Farm Labor Contractors and Farm Labor Contractor Employees § 500.60...

  10. 48 CFR 52.247-16 - Contractor Responsibility for Returning Undelivered Freight.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... no fault of the Contractor, a shipment cannot be delivered, the Contractor shall contact the shipper... shall maintain a record of the goods that, through no fault of the Contractor, could not be delivered... fault of the Contractor, a shipment cannot be delivered, the Contractor shall return the shipment to...

  11. 48 CFR 52.247-16 - Contractor Responsibility for Returning Undelivered Freight.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... no fault of the Contractor, a shipment cannot be delivered, the Contractor shall contact the shipper... shall maintain a record of the goods that, through no fault of the Contractor, could not be delivered... fault of the Contractor, a shipment cannot be delivered, the Contractor shall return the shipment to...

  12. 48 CFR 52.247-16 - Contractor Responsibility for Returning Undelivered Freight.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... no fault of the Contractor, a shipment cannot be delivered, the Contractor shall contact the shipper... shall maintain a record of the goods that, through no fault of the Contractor, could not be delivered... fault of the Contractor, a shipment cannot be delivered, the Contractor shall return the shipment to...

  13. 48 CFR 52.247-16 - Contractor Responsibility for Returning Undelivered Freight.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... no fault of the Contractor, a shipment cannot be delivered, the Contractor shall contact the shipper... shall maintain a record of the goods that, through no fault of the Contractor, could not be delivered... fault of the Contractor, a shipment cannot be delivered, the Contractor shall return the shipment to...

  14. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... contractors have implemented the mandatory contractor business ethics program requirements. DATES: Effective... FAR 52.203-13, Contractor Code of Business Ethics and Conduct. This final rule modifies FAR 42.302... ensure that contractors have implemented the mandatory contractor business ethics program requirements...

  15. Afghanistan Contractor Accountability Act of 2012

    THOMAS, 112th Congress

    Sen. Shaheen, Jeanne [D-NH

    2012-08-02

    08/02/2012 Read twice and referred to the Committee on Homeland Security and Governmental Affairs. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  16. Commonsense Contractor Compensation Act of 2013

    THOMAS, 113th Congress

    Sen. Boxer, Barbara [D-CA

    2013-06-19

    06/19/2013 Read twice and referred to the Committee on Homeland Security and Governmental Affairs. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  17. 25 CFR 900.209 - What should a self-determination contractor or contractor's employee do on receiving a non...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...'s employee do on receiving a non-medical related tort claim? 900.209 Section 900.209 Indians BUREAU... Claims Act Coverage General Provisions Non-Medical Related Claims § 900.209 What should a self-determination contractor or contractor's employee do on receiving a non-medical related tort claim? (a) If...

  18. 25 CFR 900.209 - What should a self-determination contractor or contractor's employee do on receiving a non...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...'s employee do on receiving a non-medical related tort claim? 900.209 Section 900.209 Indians BUREAU... Claims Act Coverage General Provisions Non-Medical Related Claims § 900.209 What should a self-determination contractor or contractor's employee do on receiving a non-medical related tort claim? (a) If...

  19. Contractor renormalization group and the Haldane conjecture

    SciTech Connect

    Weinstein, Marvin

    2001-05-01

    The contractor renormalization group formalism (CORE) is a real-space renormalization group method which is the Hamiltonian analogue of the Wilson exact renormalization group equations. In an earlier paper [Phys. Rev. D 61, 034505 (2000)] I showed that the CORE method could be used to map a theory of free quarks and quarks interacting with gluons into a generalized frustrated Heisenberg antiferromagnet (HAF) and proposed using CORE methods to study these theories. Since generalizations of HAF's exhibit all sorts of subtle behavior which, from a continuum point of view, are related to topological properties of the theory, it is important to know that CORE can be used to extract this physics. In this paper I show that despite the folklore which asserts that all real-space renormalization group schemes are necessarily inaccurate, simple CORE computations can give highly accurate results even if one only keeps a small number of states per block and a few terms in the cluster expansion. In addition I argue that even very simple CORE computations give a much better qualitative understanding of the physics than naive renormalization group methods. In particular I show that the simplest CORE computation yields a first-principles understanding of how the famous Haldane conjecture works for the case of the spin-1/2 and spin-1 HAF.

  20. Surplus Facilities Management Program. Post-remedial-action survey report for SNAP-8 Experimental Reactor Facility, building 010 site, Santa Susana Field Laboratories, Rockwell International, Ventura County, California

    NASA Astrophysics Data System (ADS)

    Wynveen, R. A.; Smith, W. H.; Sholeem, C. M.; Mayes, C. B.; Justas, A. L.; Flynn, K. F.

    1984-04-01

    Based on the results of the radiological assessment the following conclusions were reached: (1) soil contaminated with the radionuclides Co(60) and Er(152)Eu of undetermined origin was detected in the southwest quadrant of the Building 010 site. Co(60) was also detected in a borehole sample taken from the area that previously held the radioactive gas hold up tanks. Uranium was detected in soil from a hole in the center of the building site and in a second hole southwest of the building site. In all cases, the radionuclide levels encountered in the soil were well below the criteria set by DOE for this site; and (2) the direct instrument readings at the surface of the site were probably the result of natural radiation (terrestrial and celestial), as well as shine from the material being stored at the nearby RMDF facility. There was no evidence that the contaminated soil under the asphalt pad contributed detectable levels to the total background readings.

  1. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... Regulation; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of...

  2. 48 CFR 45.502 - Subcontractor and alternate prime contractor locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... alternate prime contractor locations. 45.502 Section 45.502 Federal Acquisition Regulations System FEDERAL....502 Subcontractor and alternate prime contractor locations. (a) To ensure subcontractor compliance with Government property administration requirements, and with prime contractor consent, the...

  3. 48 CFR 45.502 - Subcontractor and alternate prime contractor locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... alternate prime contractor locations. 45.502 Section 45.502 Federal Acquisition Regulations System FEDERAL....502 Subcontractor and alternate prime contractor locations. (a) To ensure subcontractor compliance with Government property administration requirements, and with prime contractor consent, the...

  4. 76 FR 37353 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Business Ethics Compliance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-27

    ... Regulation; Submission for OMB Review; Contractor Business Ethics Compliance Program and Disclosure... requirement concerning contractor business ethics compliance program and disclosure requirements. Public... Information Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure...

  5. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    SciTech Connect

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.

  6. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    SciTech Connect

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements.

  7. Report on audit of management and operating contractors` subcontract administration

    SciTech Connect

    Not Available

    1993-08-10

    The four audited DOE contractors had not established adequate systems to award and administer subcontracts. Their systems did not provide for fair and effective competition, reasonable costs and prices, and timely closure of completed subcontracts. These conditions existed because contractors did not ensure that employees adhered to contract terms and company policies, and because the Department did not adequately monitor contractors` purchasing systems. As a result, the Department paid excessive prices for goods and services and committed more funds than needed for subcontract costs.

  8. Contingency contractor optimization. Phase 3, model description and formulation.

    SciTech Connect

    Gearhart, Jared Lee; Adair, Kristin Lynn; Jones, Katherine A.; Bandlow, Alisa; Durfee, Justin D.; Jones, Dean A.; Martin, Nathaniel; Detry, Richard Joseph; Nanco, Alan Stewart; Nozick, Linda Karen

    2013-10-01

    The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

  9. Contingency contractor optimization. phase 3, model description and formulation.

    SciTech Connect

    Gearhart, Jared Lee; Adair, Kristin Lynn; Jones, Katherine A.; Bandlow, Alisa; Detry, Richard Joseph; Durfee, Justin D.; Jones, Dean A.; Martin, Nathaniel; Nanco, Alan Stewart; Nozick, Linda Karen

    2013-06-01

    The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

  10. Authorization basis for the 209-E Building

    SciTech Connect

    TIFFANY, M.S.

    1999-02-23

    This Authorization Basis document is one of three documents that constitute the Authorization Basis for the 209-E Building. Per the U.S. Department of Energy, Richland Operations Office (RL) letter 98-WSD-074, this document, the 209-E Building Preliminary Hazards Analysis (WHC-SD-WM-TI-789), and the 209-E Building Safety Evaluation Report (97-WSD-074) constitute the Authorization Basis for the 209-E Building. This Authorization Basis and the associated controls and safety programs will remain in place until safety documentation addressing deactivation of the 209-E Building is developed by the contractor and approved by RL.

  11. A remediation contractor`s view of accelerating the cleanup process

    SciTech Connect

    Librizzi, W.J.; Phelps, G.S.

    1994-12-31

    Superfund, since its passage in December, 1980, has been under continual evaluation and change. Progress has been made over the past 13 years. To date, EPA under Superfund has completed 220 long term cleanups with 1,100 in various stages of completion. In addition, Superfund has been a catalyst for the development of new innovative cleanup technologies. In this regard, EPA has identified more than 150 innovative technologies now being used to treat contaminated soil, groundwater, sludge and sediments. Despite these noted accomplishments, continued criticisms of the program focus on Superfund weaknesses. They include: inconsistent cleanups; high transactional costs; perceived unfairness in liability; overlapping federal/state relationship; Inadequate community involvement; impediments to economic development. Techniques that can accelerate the hazardous waste cleanup process are discussed further in this paper. They include: strengthened interrelationships between the design and remediation contractors; role of the remediation contractor in the implementation of presumptive remedies; a proactive community relations program, partnering and early and frequent interface with regulatory agencies.

  12. Building beyond the Evaluation Of Environmental Education and Sustainable Development in African Schools and Communities: The Women Global Green Action Network (WGGAN) Africa Perspective

    ERIC Educational Resources Information Center

    Enie, Rosemary Olive Mbone

    2006-01-01

    This article describes the Community Health Education and School Sanitation (CHESS) Project, an initiative by the Women Global Green Action Network International to support community-based environmental projects in Africa. The CHESS Project uses women, children and youth to develop more sustainable health and sanitation systems in urban and rural…

  13. Women Reaching Women: A Story of Change. The Role of Narrative in Building Trust and Commitment during an Action Research Project

    ERIC Educational Resources Information Center

    Langley, Dawn

    2012-01-01

    Women Reaching Women was a three-year action research project aimed at raising awareness of world poverty, gender inequality and climate change. The project brought together the National Federation of Women's Institutes, Oxfam, the Everyone Foundation and a unique group of 28 women drawn from Women's Institutes across the country. The project…

  14. Community Engagement through Collective Efficacy: Building Partnerships in an Urban Community to Encourage Collective Action to Increase Student Achievement in a Neighborhood School

    ERIC Educational Resources Information Center

    Mc Mullen, Vickie

    2012-01-01

    The challenge of ensuring educational equity, closing the achievement gap between African American students and White students attending public schools has gone on for half a century. As we enter the twenty-first century, neither educational reforms enacted by the public school system nor legislative actions, the No Child Left Behind (NCLB) Act of…

  15. Why a Contractor May Do the Job Better

    ERIC Educational Resources Information Center

    Braymen, Gene

    1974-01-01

    A food service contractor tells college administrators what they should be able to get from a good outside food service: quick implementation of innovations, well-trained management personnel, and lesser costs. (Author/PG)

  16. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Federal Contractor employee travelers by AMTRAK, hotels, motels, or car rental companies, when use of such... employees. (d) Hotels/motels. Many lodging providers extend their discount rates for Federal employees...

  17. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Federal Contractor employee travelers by AMTRAK, hotels, motels, or car rental companies, when use of such... employees. (d) Hotels/motels. Many lodging providers extend their discount rates for Federal employees...

  18. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Federal Contractor employee travelers by AMTRAK, hotels, motels, or car rental companies, when use of such... employees. (d) Hotels/motels. Many lodging providers extend their discount rates for Federal employees...

  19. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Federal Contractor employee travelers by AMTRAK, hotels, motels, or car rental companies, when use of such... employees. (d) Hotels/motels. Many lodging providers extend their discount rates for Federal employees...

  20. 49 CFR 633.17 - PMO contractor eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.17 PMO contractor eligibility. (a) Any person or entity may provide project management oversight services in... regulations, found at 48 CFR CH I....

  1. 49 CFR 633.17 - PMO contractor eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.17 PMO contractor eligibility. (a) Any person or entity may provide project management oversight services in... regulations, found at 48 CFR CH I....

  2. 49 CFR 633.17 - PMO contractor eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.17 PMO contractor eligibility. (a) Any person or entity may provide project management oversight services in... regulations, found at 48 CFR CH I....

  3. 49 CFR 633.17 - PMO contractor eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.17 PMO contractor eligibility. (a) Any person or entity may provide project management oversight services in... regulations, found at 48 CFR CH I....

  4. 49 CFR 633.17 - PMO contractor eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.17 PMO contractor eligibility. (a) Any person or entity may provide project management oversight services in... regulations, found at 48 CFR CH I....

  5. 48 CFR 2804.470 - Contractor Personnel Security Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Personnel Security Program. 2804.470 Section 2804.470 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE... Personnel Security Program....

  6. Technology transfer from the viewpoint of a NASA prime contractor

    NASA Technical Reports Server (NTRS)

    Dyer, Gordon

    1992-01-01

    Viewgraphs on technology transfer from the viewpoint of a NASA prime contractor are provided. Technology Transfer Program for Manned Space Systems and the Technology Transfer Program status are addressed.

  7. 77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-24

    ... Employment and Training Administration Guam Military Base Realignment Contractor Recruitment Standards AGENCY... for Guam military base realignment projects funded through the National Defense Authorization Act... the end of this Federal Register Notice). Under the NDAA, no Guam base realignment...

  8. Highlights of contractor initiatives in quality enhancement and productivity improvement

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The NASA/Contractor Team efforts are presented as part of NASA's continuing effort to facilitate the sharing of quality and productivity improvement ideas among its contractors. This complilation is not meant to be a comprehensive review of contractor initiative nor does it necessarily express NASA's views. The submissions represent samples from a general survey, and were not edited by NASA. The efforts are examples of quality and productivity programs in private industry, and as such, highlight company efforts in individual areas. Topics range from modernization of equipment, hardware, and technology to management of human resources. Of particular interest are contractor initiatives which deal with measurement and evaluation data pertaining to quality and productivity performance.

  9. 2005 River Corridor Cleanup Contractor Revegetation Monitoring Report

    SciTech Connect

    A. L. Johnson

    2005-09-12

    This report contains a compilation of the results of vegetation monitoring data that were collected in the spring and summer of 2005 for the Environmental Restoration Contractor's revegetation and mitigation areas on the Hanford Site.

  10. Fact-File: Top Non-Profit Defense Contractors.

    ERIC Educational Resources Information Center

    Chronicle of Higher Education, 1985

    1985-01-01

    Colleges universities, and nonprofit organizations received 2.1 billion dollars in Department of Defense contract funds for research, development, testing, and evaluation in fiscal 1984. Tables of the 1984 figures that list the top contractors are presented. (MLW)

  11. Specification for HEPA filters used by DOE contractors

    SciTech Connect

    1997-01-01

    This standard establishes specification and testing requirements for High Efficiency Particulate Air (HEPA) filters procured to provide personnel and environmental protection when installed in DOE nuclear facilities. The standard specifies minimum requirements to be included in contractor specifications.

  12. 32 CFR 989.23 - Contractor prepared documents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force EIAP documents belong to and are the responsibility of the Air Force. EIAP correspondence and...

  13. 32 CFR 989.23 - Contractor prepared documents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force EIAP documents belong to and are the responsibility of the Air Force. EIAP correspondence and...

  14. 32 CFR 989.23 - Contractor prepared documents.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force EIAP documents belong to and are the responsibility of the Air Force. EIAP correspondence and...

  15. 32 CFR 989.23 - Contractor prepared documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force EIAP documents belong to and are the responsibility of the Air Force. EIAP correspondence and...

  16. 32 CFR 989.23 - Contractor prepared documents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force EIAP documents belong to and are the responsibility of the Air Force. EIAP correspondence and...

  17. Human Resources Staffing Plan for the Tank Farm Contractor

    SciTech Connect

    BOSLEY, J.W.

    2000-04-22

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline.

  18. Colorado Better Buildings Project Final Report

    SciTech Connect

    Strife, Susie; Yancey, Lea

    2013-12-30

    The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Department of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among field

  19. Integration of Occupational Safety to Contractors` or Subcontractors` Performance Evaluation in Construction Projects

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Struková, Zuzana

    2013-06-01

    Several factors should be considered by the owner and general contractor in the process of contractors` and subcontractors` selection and evaluation. The paper reviews the recent models addressed to guide general contractors in subcontractors' selection process and in evaluation of different contractors during the execution of the project. Moreover the paper suggests the impact of different contractors' performance to the overall level of occupational health and safety culture at the sites. It deals with the factors influencing the safety performance of contractors during construction and analyses the methods for assessing the safety performance of construction contractors. The results of contractors' safety performance evaluation could be a useful tool in motivating contractors to achieve better safety outcomes or could have effect on owners` or general contractors' decision making about contractors suitability for future contracting works.

  20. Building Global Learning Communities

    ERIC Educational Resources Information Center

    Cochrane, Thomas; Buchem, Ilona; Camacho, Mar; Cronin, Catherine; Gordon, Averill; Keegan, Helen

    2013-01-01

    Within the background where education is increasingly driven by the economies of scale and research funding, we propose an alternative online open and connected framework (OOC) for building global learning communities using mobile social media. We critique a three year action research case study involving building collaborative global learning…

  1. Confirmatory radiological survey of the BORAX-V turbine building Idaho National Engineering Laboratory, Idaho Falls, Idaho

    SciTech Connect

    Stevens, G.H.; Coleman, R.L.; Jensen, M.K.; Pierce, G.A.; Egidi, P.V.; Mather, S.K.

    1993-07-01

    An independent assessment of the remediation of the BORAX-V (Boiling Water Reactor Experiment) turbine building at the Idaho National Engineering Laboratory (INEL), Idaho Falls, Idaho, was accomplished by the Oak Ridge National Laboratory Pollutant Assessments Group (ORNL/PAG). The purpose of the assessment was to confirm the site`s compliance with applicable Department of Energy guidelines. The assessment included reviews of both the decontamination and decommissioning Plan and data provided from the pre- and post-remedial action surveys and an independent verification survey of the facility. The independent verification survey included determination of background exposure rates and soil concentrations, beta-gamma and gamma radiation scans, smears for detection of removable contamination, and direct measurements for alpha and beta-gamma radiation activity on the basement and mezzanine floors and the building`s interior and exterior walls. Soil samples were taken, and beta-gamma and gamma radiation exposure rates were measured on areas adjacent to the building. Results of measurements on building surfaces at this facility were within established contamination guidelines except for elevated beta-gamma radiation levels located on three isolated areas of the basement floor. Following remediation of these areas, ORNL/PAG reviewed the remedial action contractor`s report and agreed that remediation was effective in removing the source of the elevated direct radiation. Results of all independent soil analyses for {sup 60}Co were below the detection limit. The highest {sup 137}Cs analysis result was 4.6 pCi/g; this value is below the INEL site-specific guideline of 10 pCi/g.

  2. Confirmatory radiological survey of the Grand Junction Projects Office Remedial Action Project exterior portions, 1989-1995

    SciTech Connect

    Forbes, G.H.; Egidi, P.V.

    1997-04-01

    The purpose of this independent assessment was to provide the U.S. Department of Energy (DOE) with an independent verification (IV) that the soil at the Grand Junction Projects Office (GJPO) complies with applicable DOE guidelines. Oak Ridge National Laboratory/ Environmental Technology Section (ORNL/ETS) which is also located at the GJPO, was assigned by DOE as the Independent Verification Contractor (IVC). The assessment included reviews of the decontamination and decommissioning plan, annual environmental monitoring reports, data in the pre- and post-remedial action reports, reassessment reports and IV surveys. Procedures and field methods used during the remediation were reviewed, commented on, and amended as needed. The IV surveys included beta-gamma and gamma radiation scans, soil sampling and analyses. Based on the data presented in the post-remedial action report and the results of the IV surveys, the remediation of the outdoor portions of the GJPO has achieved the objectives. Residual deposits of uranium contamination may exist under asphalt because the original characterization was not designed to identify uranium and subsequent investigations were limited. The IVC recommends that this be addressed with the additional remediation. The IVC is working with the remedial action contractor (RAC) to assure that final documentation WM be sufficient for certification. The IVC will address additional remediation of buildings, associated utilities, and groundwater in separate reports. Therefore, this is considered a partial verification.

  3. Wayside Teaching: Building Autonomy

    ERIC Educational Resources Information Center

    Powell, Sara Davis

    2011-01-01

    Educators can implement strategies to build positive relationships with students that will help them become more autonomous and less anonymous in school. These strategies allow young adolescents to become more self aware, to take greater responsibility for their actions, to reflect on their own lives and actions, and to have choices regarding…

  4. Texas Solar Collaboration Action Plan

    SciTech Connect

    Winland, Chris

    2013-02-14

    Texas Solar Collaboration Permitting and Interconenction Process Improvement Action Plan. San Antonio-specific; Investigate feasibility of using electronic signatures; Investigate feasibility of enabling other online permitting processes (e.g., commercial); Assess need for future document management and workflow/notification IT improvements; Update Information Bulletin 153 regarding City requirements and processes for PV; Educate contractors and public on CPS Energy’s new 2013 solar program processes; Continue to discuss “downtown grid” interconnection issues and identify potential solutions; Consider renaming Distributed Energy Resources (DER); and Continue to participate in collaborative actions.

  5. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... suspension actions. (a) The contracting officer shall comply with the procedures of 48 CFR 23.506 regarding... Substance Abuse Programs at DOE Sites. (b) For purposes of 10 CFR part 707, the specific causes for... contractor are: (1) The contractor fails to either comply with the requirements of 10 CFR part 707 or...

  6. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... suspension actions. (a) The contracting officer shall comply with the procedures of 48 CFR 23.506 regarding... Substance Abuse Programs at DOE Sites. (b) For purposes of 10 CFR part 707, the specific causes for... contractor are: (1) The contractor fails to either comply with the requirements of 10 CFR part 707 or...

  7. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... suspension actions. (a) The contracting officer shall comply with the procedures of 48 CFR 23.506 regarding... Substance Abuse Programs at DOE Sites. (b) For purposes of 10 CFR part 707, the specific causes for... contractor are: (1) The contractor fails to either comply with the requirements of 10 CFR part 707 or...

  8. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... suspension actions. (a) The contracting officer shall comply with the procedures of 48 CFR 23.506 regarding... Substance Abuse Programs at DOE Sites. (b) For purposes of 10 CFR part 707, the specific causes for... contractor are: (1) The contractor fails to either comply with the requirements of 10 CFR part 707 or...

  9. Measure Guideline: Air Sealing Attics in Multifamily Buildings

    SciTech Connect

    Otis, C.; Maxwell, S.

    2012-06-01

    This Building America Measure Guideline is intended for owners, builders, contractors, homeowners, and other stakeholders in the multifamily building industry, and focuses on challenges found in existing buildings for a variety of housing types. It explains why air sealing is desirable, explores related health and safety issues, and identifies common air leakage points in multifamily building attics. In addition, it also gives an overview of materials and techniques typically used to perform air sealing work.

  10. Measure Guideline. Air Sealing Attics in Multifamily Buildings

    SciTech Connect

    Otis, Casey; Maxwell, Sean

    2012-06-01

    This Building America Measure Guideline is intended for owners, builders, contractors, homeowners, and other stakeholders in the multifamily building industry, and focuses on challenges found in existing buildings for a variety of housing types. It explains why air sealing is desirable, explores related health and safety issues, and identifies common air leakage points in multifamily building attics. In addition, it also gives an overview of materials and techniques typically used to perform air sealing work.

  11. Kennedy Space Center's NASA/Contractor Team-Centered Total Quality Management Seminar: Results, methods, and lessons learned

    NASA Technical Reports Server (NTRS)

    Kinlaw, Dennis C.; Eads, Jeannette

    1992-01-01

    It is apparent to everyone associated with the Nation's aeronautics and space programs that the challenge of continuous improvement can be reasonably addressed only if NASA and its contractors act together in a fully integrated and cooperative manner that transcends the traditional boundaries of proprietary interest. It is, however, one thing to assent to the need for such integration and cooperation; it is quite another thing to undertake the hard tasks of turning such a need into action. Whatever else total quality management is, it is fundamentally a team-centered and team-driven process of continuous improvement. The introduction of total quality management at KSC, therefore, has given the Center a special opportunity to translate the need for closer integration and cooperation among all its organizations into specific initiatives. One such initiative that NASA and its contractors have undertaken at KSC is a NASA/Contractor team-centered Total Quality Management Seminar. It is this seminar which is the subject of this paper. The specific purposes of this paper are to describe the following: Background, development, and evolution of Kennedy Space Center's Total Quality Management Seminar; Special characteristics of the seminar; Content of the seminar; Meaning and utility of a team-centered design for TQM training; Results of the seminar; Use that one KSC contractor, EG&G Florida, Inc. has made of the seminar in its Total Quality Management initiative; and Lessons learned.

  12. 42 CFR 421.316 - Limitation on Medicare integrity program contractor liability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Limitation on Medicare integrity program contractor... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM MEDICARE CONTRACTING Medicare Integrity Program Contractors § 421.316 Limitation on Medicare integrity program contractor liability. (a) A MIP contractor,...

  13. 48 CFR 245.603-70 - Contractor performance of plant clearance duties.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... plant clearance duties. 245.603-70 Section 245.603-70 Federal Acquisition Regulations System DEFENSE..., Redistribution, and Disposal of Contractor Inventory 245.603-70 Contractor performance of plant clearance duties... activity approval and contractor concurrence, authorize selected contractors to perform certain...

  14. 48 CFR 245.7205 - Reporting excess and surplus contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... surplus contractor inventory. 245.7205 Section 245.7205 Federal Acquisition Regulations System DEFENSE... Instructions 245.7205 Reporting excess and surplus contractor inventory. (a) Contract administration offices... Contractor Inventory, or mechanized equivalent, to report the disposition of contractor inventory. Do...

  15. 29 CFR 500.60 - Farm labor contractors' recruitment, contractual and general obligations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Farm labor contractors' recruitment, contractual and... labor contractors' recruitment, contractual and general obligations. The Act imposes certain specific recruitment, contractual and general obligations on farm labor contractors and farm labor contractor...

  16. 37 CFR 401.9 - Retention of rights by contractor employee inventor.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... contractor employee inventor. 401.9 Section 401.9 Patents, Trademarks, and Copyrights ASSISTANT SECRETARY FOR... by contractor employee inventor. Agencies which allow an employee/inventor of the contractor to... nonprofit organization contractor, as authorized by 35 U.S.C. 202(d), will impose upon the inventor at...

  17. 37 CFR 401.9 - Retention of rights by contractor employee inventor.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... contractor employee inventor. 401.9 Section 401.9 Patents, Trademarks, and Copyrights ASSISTANT SECRETARY FOR... by contractor employee inventor. Agencies which allow an employee/inventor of the contractor to... nonprofit organization contractor, as authorized by 35 U.S.C. 202(d), will impose upon the inventor at...

  18. 37 CFR 401.9 - Retention of rights by contractor employee inventor.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... contractor employee inventor. 401.9 Section 401.9 Patents, Trademarks, and Copyrights NATIONAL INSTITUTE OF... rights by contractor employee inventor. Agencies which allow an employee/inventor of the contractor to... nonprofit organization contractor, as authorized by 35 U.S.C. 202(d), will impose upon the inventor at...

  19. 48 CFR 2427.305-2 - Follow-up by contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Follow-up by contractor. 2427.305-2 Section 2427.305-2 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to...

  20. 48 CFR 2427.305-2 - Follow-up by contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor. 2427.305-2 Section 2427.305-2 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to...

  1. 48 CFR 2427.305-2 - Follow-up by contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Follow-up by contractor. 2427.305-2 Section 2427.305-2 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to...

  2. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or...

  3. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or...

  4. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or...

  5. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or...

  6. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or...

  7. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d)...

  8. A Call to Action: Building a Translational Inclusion Team Science in Physical Activity, Nutrition, and Obesity Management for Children with Disabilities.

    PubMed

    Rimmer, James H; Vanderbom, Kerri A

    2016-01-01

    The growing evidence base of childhood obesity prevention and treatment programs do not adequately consider how to adapt these programs for children with disabilities. We propose a Call to Action for health researchers who conduct studies focused on the general population (i.e., without a disability) to work closely with disability researchers to adapt their programs (e.g., obesity management, increased physical activity, and caregiver training in diet and nutrition) to be relevant to both groups. We refer to this approach as inclusion team science. The hope for this Call to Action is that there will be greater synergy between researchers who have high levels of expertise in a specialty area of health (but little or no knowledge of how to adapt their program for children with disabilities) to work more closely with researchers who have a high level of expertise in adapting evidence-based health promotion recommendations and strategies for children with disabilities. Together, these two areas of expertise will lead to inclusive physical activity and nutrition programs for all children. PMID:27559540

  9. A Call to Action: Building a Translational Inclusion Team Science in Physical Activity, Nutrition, and Obesity Management for Children with Disabilities

    PubMed Central

    Rimmer, James H.; Vanderbom, Kerri A.

    2016-01-01

    The growing evidence base of childhood obesity prevention and treatment programs do not adequately consider how to adapt these programs for children with disabilities. We propose a Call to Action for health researchers who conduct studies focused on the general population (i.e., without a disability) to work closely with disability researchers to adapt their programs (e.g., obesity management, increased physical activity, and caregiver training in diet and nutrition) to be relevant to both groups. We refer to this approach as inclusion team science. The hope for this Call to Action is that there will be greater synergy between researchers who have high levels of expertise in a specialty area of health (but little or no knowledge of how to adapt their program for children with disabilities) to work more closely with researchers who have a high level of expertise in adapting evidence-based health promotion recommendations and strategies for children with disabilities. Together, these two areas of expertise will lead to inclusive physical activity and nutrition programs for all children. PMID:27559540

  10. Revegetation Plan for Areas of the Fitzner-Eberhardt Arid Lands Ecology Reserve Affected by Decommissioning of Buildings and Infrastructure and Debris Clean-up Actions

    SciTech Connect

    Downs, Janelle L.; Durham, Robin E.; Larson, Kyle B.

    2011-01-01

    The U.S. Department of Energy (DOE), Richland Operations Office is working to remove a number of facilities on the Fitzner Eberhardt Arid Lands Ecology Reserve (ALE), which is part of the Hanford Reach National Monument. Decommissioning and removal of buildings and debris on ALE will leave bare soils and excavated areas that need to be revegetated to prevent erosion and weed invasion. Four main areas within ALE are affected by these activities (DOE 2009;DOE/EA-1660F): 1) facilities along the ridgeline of Rattlesnake Mountain, 2) the former Nike missile base and ALE HQ laboratory buildings, 3) the aquatic research laboratory at Rattlesnake Springs area, and 4) a number of small sites across ALE where various types of debris remain from previous uses. This revegetation plan addresses the revegetation and restoration of those land areas disturbed by decommissioning and removal of buildings, facilities and associated infrastructure or debris removal. The primary objective of the revegetation efforts on ALE is to establish native vegetation at each of the sites that will enhance and accelerate the recovery of the native plant community that naturally persists at that location. Revegetation is intended to meet the direction specified by the Environmental Assessment (DOE 2009; DOE/EA-1660F) and by Stipulation C.7 of the Memorandum of Agreement (MOA) for the Rattlesnake Mountain Combined Community Communication Facility and InfrastructureCleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland Washington(DOE 2009; Appendix B). Pacific Northwest National Laboratory (PNNL) under contract with CH2M Hill Plateau Remediation Company (CPRC) and in consultation with the tribes and DOE-RL developed a site-specific strategy for each of the revegetation units identified within this document. The strategy and implementation approach for each revegetation unit identifies an appropriate native species mix and outlines the necessary site preparation activities

  11. School Building Projects: Managing Insurance and Contracts during Construction

    ERIC Educational Resources Information Center

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  12. Steam Balancing and Tuning for Multifamily Residential Buildings in Chicagoland

    SciTech Connect

    Choi, J.; Ludwig, P.; Brand, L.

    2012-08-01

    Older heating systems often suffer from mis-investment--multiple contractors upgrading parts of systems in inadequate or inappropriate ways that reduce system functionality and efficiency--or from a lack of proper maintenance. This technical report addresses these barriers to information, contractor resources, and cost-savings. Building off of previous research, CNT Energy conducted a study to identify best practices for the methodology, typical costs, and energy savings associated with steam; system balancing.

  13. 309 Building fire protection analysis and justification for deactivation of sprinkler system. Revision 1

    SciTech Connect

    Conner, R.P.

    1997-06-25

    Provide a `graded approach` fire evaluation in preparation for turnover to Environmental Restoration Contractor for D&D. Scope includes revising 309 Building book value and evaluating fire hazards, radiological and toxicological releases, and life safety issues.

  14. Supporting contractors' bidding decision: RBF neural networks application

    NASA Astrophysics Data System (ADS)

    Leśniak, Agnieszka

    2016-06-01

    A bidding decision, despite its being important for the contractor, often needs to be made quickly and within a limited timeframe. To facilitate the contractor's reasoning by limiting randomness that may lead to mistakes decision support models are frequently applied. This paper presents possible applications of an Artificial Neural Network (ANN) to support bidding decisions. The proposed model involving networks with radial basis functions (RBF) was to perform a classification task. On the basis of a set of input data, the network was to suggest either participation in the bid or resignation from it. The results, 93% of correctly classified cases, confirmed the usability of RBF network in solving the problem.

  15. How to build up the actionable knowledge base: the role of ‘best fit’ framework synthesis for studies of improvement in healthcare

    PubMed Central

    Booth, Andrew; Carroll, Christopher

    2015-01-01

    Increasing recognition of the role and value of theory in improvement work in healthcare offers the prospect of capitalising upon, and consolidating, actionable lessons from synthesis of improvement projects and initiatives. We propose that informed use of theory can (i) provide a mechanism by which to collect and organise data from a body of improvement work, (ii) offer a framework for analysis and identification of lessons learnt and (iii) facilitate an evaluation of the feasibility, effectiveness and acceptability of improvement programmes. Improvement practitioners can benefit from using an underpinning external structure as a lens by which to examine the specific achievements of their own projects alongside comparable initiatives led by others. We demonstrate the utility of a method known as ‘best fit framework synthesis’ (BFFS) in offering a ubiquitous and versatile means by which to collect, analyse and evaluate improvement work in healthcare. First reported in 2011, BFFS represents a pragmatic, flexible approach to integrating theory with findings from practice. A deductive phase, where a review team seeks to accommodate a substantial part of the data, is followed by an inductive phase, in which the team explores data not accommodated by the framework. We explore the potential for BFFS within improvement work by drawing upon the evidence synthesis methodology literature and practical examples of improvement work reported in BMJ Quality and Safety (2011–2015). We suggest four variants of BFFS that may have particular value in synthesising a body of improvement work. We conclude that BFFS, alongside other approaches that seek to optimise the contribution of theory to improvement work, represents one important enabling mechanism by which to establish the rigour and scientific credentials of the emerging discipline of ‘improvement science’. PMID:26306609

  16. How to build up the actionable knowledge base: the role of 'best fit' framework synthesis for studies of improvement in healthcare.

    PubMed

    Booth, Andrew; Carroll, Christopher

    2015-11-01

    Increasing recognition of the role and value of theory in improvement work in healthcare offers the prospect of capitalising upon, and consolidating, actionable lessons from synthesis of improvement projects and initiatives. We propose that informed use of theory can (i) provide a mechanism by which to collect and organise data from a body of improvement work, (ii) offer a framework for analysis and identification of lessons learnt and (iii) facilitate an evaluation of the feasibility, effectiveness and acceptability of improvement programmes. Improvement practitioners can benefit from using an underpinning external structure as a lens by which to examine the specific achievements of their own projects alongside comparable initiatives led by others. We demonstrate the utility of a method known as 'best fit framework synthesis' (BFFS) in offering a ubiquitous and versatile means by which to collect, analyse and evaluate improvement work in healthcare. First reported in 2011, BFFS represents a pragmatic, flexible approach to integrating theory with findings from practice. A deductive phase, where a review team seeks to accommodate a substantial part of the data, is followed by an inductive phase, in which the team explores data not accommodated by the framework. We explore the potential for BFFS within improvement work by drawing upon the evidence synthesis methodology literature and practical examples of improvement work reported in BMJ Quality and Safety (2011-2015). We suggest four variants of BFFS that may have particular value in synthesising a body of improvement work. We conclude that BFFS, alongside other approaches that seek to optimise the contribution of theory to improvement work, represents one important enabling mechanism by which to establish the rigour and scientific credentials of the emerging discipline of 'improvement science'. PMID:26306609

  17. 48 CFR 52.237-2 - Protection of Government Buildings, Equipment, and Vegetation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Buildings, Equipment, and Vegetation. 52.237-2 Section 52.237-2 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.237-2 Protection of Government Buildings, Equipment, and Vegetation...: Protection of Government Buildings, Equipment, and Vegetation (APR 1984) The Contractor shall use...

  18. 48 CFR 52.237-2 - Protection of Government Buildings, Equipment, and Vegetation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Buildings, Equipment, and Vegetation. 52.237-2 Section 52.237-2 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.237-2 Protection of Government Buildings, Equipment, and Vegetation...: Protection of Government Buildings, Equipment, and Vegetation (APR 1984) The Contractor shall use...

  19. 48 CFR 52.237-2 - Protection of Government Buildings, Equipment, and Vegetation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Buildings, Equipment, and Vegetation. 52.237-2 Section 52.237-2 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.237-2 Protection of Government Buildings, Equipment, and Vegetation...: Protection of Government Buildings, Equipment, and Vegetation (APR 1984) The Contractor shall use...

  20. 48 CFR 52.237-2 - Protection of Government Buildings, Equipment, and Vegetation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Buildings, Equipment, and Vegetation. 52.237-2 Section 52.237-2 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.237-2 Protection of Government Buildings, Equipment, and Vegetation...: Protection of Government Buildings, Equipment, and Vegetation (APR 1984) The Contractor shall use...

  1. 48 CFR 52.237-2 - Protection of Government Buildings, Equipment, and Vegetation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Buildings, Equipment, and Vegetation. 52.237-2 Section 52.237-2 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.237-2 Protection of Government Buildings, Equipment, and Vegetation...: Protection of Government Buildings, Equipment, and Vegetation (APR 1984) The Contractor shall use...

  2. 28 CFR 548.14 - Community involvement (volunteers, contractors).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Community involvement (volunteers... Community involvement (volunteers, contractors). (a) The institution's chaplain may contract with representatives of faith groups in the community to provide specific religious services which the chaplain...

  3. 28 CFR 548.14 - Community involvement (volunteers, contractors).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Community involvement (volunteers... Community involvement (volunteers, contractors). (a) The institution's chaplain may contract with representatives of faith groups in the community to provide specific religious services which the chaplain...

  4. 32 CFR 516.21 - Litigation against government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 3 2011-07-01 2009-07-01 true Litigation against government contractors. 516.21 Section 516.21 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES AND PUBLIC RELATIONS LITIGATION Reporting Legal Proceedings to HQDA § 516.21 Litigation...

  5. Proceedings of the fuels technology contractors review meeting

    SciTech Connect

    Malone, R.D.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  6. 37 CFR 401.4 - Contractor appeals of exceptions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Contractor appeals of exceptions. 401.4 Section 401.4 Patents, Trademarks, and Copyrights ASSISTANT SECRETARY FOR TECHNOLOGY POLICY, DEPARTMENT OF COMMERCE RIGHTS TO INVENTIONS MADE BY NONPROFIT ORGANIZATIONS AND SMALL BUSINESS FIRMS UNDER GOVERNMENT GRANTS, CONTRACTS,...

  7. 48 CFR 253.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contractors. 253.209-1 Section 253.209-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209-1 Responsible... current. (When checked, the surveying activity will refer this factor to the Defense Security Service...

  8. 48 CFR 436.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction 436.201 Evaluation of contractor performance. Preparation of performance evaluation reports. In addition to the requirements of FAR 36.201, performance evaluation reports shall be prepared for indefinite... of services to be ordered exceeds $500,000.00. For these contracts, performance evaluation...

  9. 48 CFR 3036.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) 48 CFR 36.201. Access to reports is through the CPS or the government-wide system, Past Performance... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND...

  10. 48 CFR 236.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTS Special Aspects of Contracting for Construction 236.201 Evaluation of contractor performance. (a) Preparation of performance evaluation reports. Use DD Form 2626, Performance Evaluation (Construction... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Evaluation of...

  11. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Responsibility for independent contractor training. 46.12 Section 46.12 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT...

  12. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Responsibility for independent contractor training. 46.12 Section 46.12 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT...

  13. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Responsibility for independent contractor training. 46.12 Section 46.12 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT...

  14. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Responsibility for independent contractor training. 46.12 Section 46.12 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT...

  15. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Responsibility for independent contractor training. 46.12 Section 46.12 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT...

  16. 75 FR 3977 - Addressing Tax Delinquency by Government Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    .... (Presidential Sig.) THE WHITE HOUSE, WASHINGTON, January 20, 2010 [FR Doc. 2010-1561 Filed 1-22-10; 11:15 am... Memorandum of January 20, 2010--Addressing Tax Delinquency by Government Contractors #0; #0; #0; Presidential... Documents#0;#0; #0; #0;Title 3-- #0;The President ] Memorandum of January 20, 2010 Addressing...

  17. 21 CFR 21.30 - Records of contractors.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Food and Drug Administration in 21 CFR part 21, and rules of conduct that apply to Food and Drug... PRIVACY Requirements for Specific Categories of Records § 21.30 Records of contractors. (a) Systems of... would be a new Privacy Act Record System, or a change in an existing Privacy Act Record System of a...

  18. 21 CFR 21.30 - Records of contractors.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Food and Drug Administration in 21 CFR part 21, and rules of conduct that apply to Food and Drug... PRIVACY Requirements for Specific Categories of Records § 21.30 Records of contractors. (a) Systems of... would be a new Privacy Act Record System, or a change in an existing Privacy Act Record System of a...

  19. 21 CFR 21.30 - Records of contractors.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Food and Drug Administration in 21 CFR part 21, and rules of conduct that apply to Food and Drug... PRIVACY Requirements for Specific Categories of Records § 21.30 Records of contractors. (a) Systems of... would be a new Privacy Act Record System, or a change in an existing Privacy Act Record System of a...

  20. 21 CFR 21.30 - Records of contractors.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Food and Drug Administration in 21 CFR part 21, and rules of conduct that apply to Food and Drug... PRIVACY Requirements for Specific Categories of Records § 21.30 Records of contractors. (a) Systems of... would be a new Privacy Act Record System, or a change in an existing Privacy Act Record System of a...

  1. 21 CFR 21.30 - Records of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Food and Drug Administration in 21 CFR part 21, and rules of conduct that apply to Food and Drug... PRIVACY Requirements for Specific Categories of Records § 21.30 Records of contractors. (a) Systems of... would be a new Privacy Act Record System, or a change in an existing Privacy Act Record System of a...

  2. 28 CFR 548.14 - Community involvement (volunteers, contractors).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Community involvement (volunteers... Community involvement (volunteers, contractors). (a) The institution's chaplain may contract with representatives of faith groups in the community to provide specific religious services which the chaplain...

  3. 28 CFR 548.14 - Community involvement (volunteers, contractors).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Community involvement (volunteers... Community involvement (volunteers, contractors). (a) The institution's chaplain may contract with representatives of faith groups in the community to provide specific religious services which the chaplain...

  4. 28 CFR 548.14 - Community involvement (volunteers, contractors).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Community involvement (volunteers... Community involvement (volunteers, contractors). (a) The institution's chaplain may contract with representatives of faith groups in the community to provide specific religious services which the chaplain...

  5. 76 FR 57807 - Medicaid Program; Recovery Audit Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Federal Register (75 FR 69037), we published a proposed rule that set forth guidance to States related to... 10, 2010 proposed rule (75 FR 69037) from State associations, hospitals, medical associations... Contractor Medical Director who is a Doctor of Medicine or Doctor of Osteopathy in good standing with...

  6. 48 CFR 52.241-5 - Contractor's Facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... otherwise provided for in this contract, shall furnish, install, operate, and maintain all facilities... in this contract, a revocable permit or license to enter the service location for any proper purpose... security, public safety). (d) Unless otherwise specified in this contract, the Contractor shall, at...

  7. 48 CFR 52.241-5 - Contractor's Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... otherwise provided for in this contract, shall furnish, install, operate, and maintain all facilities... in this contract, a revocable permit or license to enter the service location for any proper purpose... security, public safety). (d) Unless otherwise specified in this contract, the Contractor shall, at...

  8. 48 CFR 52.241-5 - Contractor's Facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... otherwise provided for in this contract, shall furnish, install, operate, and maintain all facilities... in this contract, a revocable permit or license to enter the service location for any proper purpose... security, public safety). (d) Unless otherwise specified in this contract, the Contractor shall, at...

  9. 48 CFR 52.241-5 - Contractor's Facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... otherwise provided for in this contract, shall furnish, install, operate, and maintain all facilities... in this contract, a revocable permit or license to enter the service location for any proper purpose... security, public safety). (d) Unless otherwise specified in this contract, the Contractor shall, at...

  10. 48 CFR 52.241-5 - Contractor's Facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... otherwise provided for in this contract, shall furnish, install, operate, and maintain all facilities... in this contract, a revocable permit or license to enter the service location for any proper purpose... security, public safety). (d) Unless otherwise specified in this contract, the Contractor shall, at...

  11. 48 CFR 970.5203-3 - Contractor's organization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Officer a chart showing the names, duties, and organization of key personnel (see 48 CFR 952.215-70) to be... requirements set forth in 48 CFR 970.0371. Such standards and procedures shall be subject to the approval of... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's...

  12. 28 CFR 115.332 - Volunteer and contractor training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Volunteer and contractor training. 115.332 Section 115.332 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Juvenile Facilities Training and Education § 115.332...

  13. 28 CFR 115.232 - Volunteer and contractor training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Volunteer and contractor training. 115.232 Section 115.232 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Community Confinement Facilities Training and Education §...

  14. 28 CFR 115.332 - Volunteer and contractor training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Volunteer and contractor training. 115.332 Section 115.332 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Juvenile Facilities Training and Education § 115.332...

  15. 28 CFR 115.232 - Volunteer and contractor training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Volunteer and contractor training. 115.232 Section 115.232 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Community Confinement Facilities Training and Education §...

  16. 28 CFR 115.332 - Volunteer and contractor training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Volunteer and contractor training. 115.332 Section 115.332 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Juvenile Facilities Training and Education § 115.332...

  17. 28 CFR 115.232 - Volunteer and contractor training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Volunteer and contractor training. 115.232 Section 115.232 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Community Confinement Facilities Training and Education §...

  18. Technical Baseline Summary Description for the Tank Farm Contractor

    SciTech Connect

    TEDESCHI, A.R.

    2000-04-21

    This document is a revision of the document titled above, summarizing the technical baseline of the Tank Farm Contractor. It is one of several documents prepared by CH2M HILL Hanford Group, Inc. to support the U.S. Department of Energy Office of River Protection Tank Waste Retrieval and Disposal Mission at Hanford.

  19. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating...

  20. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating...