Science.gov

Sample records for action final action

  1. 40 CFR 66.81 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Final action. 66.81 Section 66.81... COLLECTION OF NONCOMPLIANCE PENALTIES BY EPA Final Action § 66.81 Final action. (a) A final Agency action... State action pursuant to part 67. (b) The actions listed in paragraph (a) of this section...

  2. 20 CFR 636.11 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Final action. 636.11 Section 636.11 Employees... HEARINGS § 636.11 Final action. The final decision of the Secretary pursuant to section 166(b) of the Act... Officer's final determination where there has been no such hearing, constitutes final agency action...

  3. 27 CFR 72.39 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 2 2010-04-01 2010-04-01 false Final action. 72.39... Remission or Mitigation of Forfeitures § 72.39 Final action. (a) Petitions for remission or mitigation of forfeiture. (1) The Director shall take final action on any petition filed pursuant to these...

  4. 33 CFR 52.64 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Final action. 52.64 Section 52.64... OF MILITARY RECORDS OF THE COAST GUARD Judgment and Disposition § 52.64 Final action. (a) The Board, provided that it acts unanimously, may take final action on behalf of the Secretary, pursuant to 10...

  5. 37 CFR 2.64 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Final action. 2.64 Section 2... COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Examination of Application and Action by Applicants § 2.64 Final action. (a) On the first or any subsequent reexamination or reconsideration the refusal of...

  6. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Final action. 92.17 Section 92.17 Money and Finance: Treasury Regulations Relating to Money and Finance UNITED STATES MINT OPERATIONS AND... States Mint § 92.17 Final action. (a) In making a final determination whether to impose a penalty,...

  7. Action Sheet 36 Final Report

    SciTech Connect

    Kips, R E; Kristo, M J; Hutcheon, I D

    2012-02-24

    Pursuant to the Arrangement between the European Commission DG Joint Research Centre (EC-JRC) and the Department of Energy (DOE) to continue cooperation on research, development, testing, and evaluation of technology, equipment, and procedures in order to improve nuclear material control, accountancy, verification, physical protection, and advanced containment and surveillance technologies for international safeguards, dated 1 September 2008, the IRMM and LLNL established cooperation in a program on the Study of Chemical Changes in Uranium Oxyfluoride Particles under IRMM-LLNL Action Sheet 36. The work under this action sheet had 2 objectives: (1) Achieve a better understanding of the loss of fluorine in UO{sub 2}F{sub 2} particles after exposure to certain environmental conditions; and (2) Provide feedback to the EC-JRC on sample reproducibility and characteristics.

  8. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day...

  9. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day...

  10. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day...

  11. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day...

  12. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day...

  13. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... THE TREASURY UNITED STATES MINT OPERATIONS AND PROCEDURES Assessment of Civil Penalties for Misuse of Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making...

  14. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... THE TREASURY UNITED STATES MINT OPERATIONS AND PROCEDURES Assessment of Civil Penalties for Misuse of Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making...

  15. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... THE TREASURY UNITED STATES MINT OPERATIONS AND PROCEDURES Assessment of Civil Penalties for Misuse of Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making...

  16. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... THE TREASURY UNITED STATES MINT OPERATIONS AND PROCEDURES Assessment of Civil Penalties for Misuse of Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making...

  17. Administrative Actions for Noncompliance; Lesser Administrative Actions. Direct final rule.

    PubMed

    2016-04-01

    The Food and Drug Administration (FDA) is amending the regulation describing lesser administrative actions that may be imposed on an Institutional Review Board (IRB) that has failed to comply with FDA's IRB regulations. We are clarifying that FDA may require the IRB to withhold approval of new FDA-regulated studies, stop the enrollment of new subjects in ongoing studies, and terminate ongoing studies, or any combination of these actions until the noncompliance with FDA's IRB regulations is corrected. We are taking this action to ensure clarity and improve the accuracy of the regulations. PMID:27044118

  18. 37 CFR 2.64 - Final action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... registration or the insistence upon a requirement may be stated to be final, whereupon applicant's response is... for filing a response to an outstanding Office action, appeal to the Trademark Trial and Appeal Board... amendment to allege use under § 2.76, the applicant is found not entitled to registration for any reason...

  19. 37 CFR 2.64 - Final action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... registration or the insistence upon a requirement may be stated to be final, whereupon applicant's response is... for filing a response to an outstanding Office action, appeal to the Trademark Trial and Appeal Board... amendment to allege use under § 2.76, the applicant is found not entitled to registration for any reason...

  20. 37 CFR 2.64 - Final action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... registration or the insistence upon a requirement may be stated to be final, whereupon applicant's response is... for filing a response to an outstanding Office action, appeal to the Trademark Trial and Appeal Board... amendment to allege use under § 2.76, the applicant is found not entitled to registration for any reason...

  1. 37 CFR 2.64 - Final action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... registration or the insistence upon a requirement may be stated to be final, whereupon applicant's response is... for filing a response to an outstanding Office action, appeal to the Trademark Trial and Appeal Board... amendment to allege use under § 2.76, the applicant is found not entitled to registration for any reason...

  2. Final Action Plan to Tiger Team

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  3. Key science legislation awaits final action

    NASA Astrophysics Data System (ADS)

    Jones, Richard M.

    Congress is now in recess and will return to work on September 7, leaving only 4 weeks to complete action on a number of key science funding bills. Fiscal year 1994 begins on October 1.On the “must-do” list for Congress upon its return is Senate consideration and final House and Senate passage of HR2491, the VA, HUD, Independent Agencies Appropriations bill. Both the National Science Foundation and NASA are independent agencies funded under HR2491.

  4. Final consolidated action plan to Tiger Team

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implementation by Sandia and monitoring by DOE. This volume (I) contains the findings and actions concerning the environment. Tables 4.2 and 4.7 summarize the annual costs estimated for completing the actions. The total costs for completion of all the actions are estimated to be $283 million over a 12 year period; the majority of the actions to be completed and costs incurred in the first five years. Resources are provided from DOE-ER/WM, the DOE/DP landlord funds (one time, physical fixes), and from the Sandia Indirect Budget.

  5. Final Consolidated action plan to Tiger Team

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implemenation by Sandia and monitoring by DOE. This volume (2) contains information and corrective action plans pertaining to safety and health and management practices.

  6. 37 CFR 1.113 - Final rejection or action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Final rejection or action. 1... Applicant and Further Consideration § 1.113 Final rejection or action. (a) On the second or any subsequent examination or consideration by the examiner the rejection or other action may be made final,...

  7. 37 CFR 1.113 - Final rejection or action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2012-07-01 2012-07-01 false Final rejection or action. 1... Applicant and Further Consideration § 1.113 Final rejection or action. (a) On the second or any subsequent examination or consideration by the examiner the rejection or other action may be made final,...

  8. 37 CFR 1.113 - Final rejection or action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2013-07-01 2013-07-01 false Final rejection or action. 1... Applicant and Further Consideration § 1.113 Final rejection or action. (a) On the second or any subsequent examination or consideration by the examiner the rejection or other action may be made final,...

  9. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  10. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  11. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  12. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  13. 40 CFR 24.20 - Final agency action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Final agency action. 24.20 Section 24.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS CORRECTIVE ACTION ORDERS Post-Hearing Procedures § 24.20 Final...

  14. 29 CFR 1614.110 - Final action by agencies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL EMPLOYMENT OPPORTUNITY Agency Program To Promote Equal Employment Opportunity § 1614.110 Final action by... right to appeal to the Equal Employment Opportunity Commission, the right to file a civil action...

  15. 24 CFR 7.37 - Final action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Department dismisses an entire complaint under 29 CFR 1614.107, receives a request for an immediate final decision or does not receive a reply to the notice issued under 29 CFR 1614.108(f), the Department shall... with 29 CFR part 1614, subpart E. The Department shall issue the final decision within 60 days...

  16. 24 CFR 7.37 - Final action.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Department dismisses an entire complaint under 29 CFR 1614.107, receives a request for an immediate final decision or does not receive a reply to the notice issued under 29 CFR 1614.108(f), the Department shall... with 29 CFR part 1614, subpart E. The Department shall issue the final decision within 60 days...

  17. 24 CFR 7.37 - Final action.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Department dismisses an entire complaint under 29 CFR 1614.107, receives a request for an immediate final decision or does not receive a reply to the notice issued under 29 CFR 1614.108(f), the Department shall... with 29 CFR part 1614, subpart E. The Department shall issue the final decision within 60 days...

  18. 24 CFR 7.37 - Final action.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Department dismisses an entire complaint under 29 CFR 1614.107, receives a request for an immediate final decision or does not receive a reply to the notice issued under 29 CFR 1614.108(f), the Department shall... with 29 CFR part 1614, subpart E. The Department shall issue the final decision within 60 days...

  19. 24 CFR 7.37 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Department dismisses an entire complaint under 29 CFR 1614.107, receives a request for an immediate final decision or does not receive a reply to the notice issued under 29 CFR 1614.108(f), the Department shall... with 29 CFR part 1614, subpart E. The Department shall issue the final decision within 60 days...

  20. 42 CFR 93.406 - Final HHS actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... prescribed in § 93.501, the ORI finding of research misconduct is the final HHS action on the research... EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct...

  1. 42 CFR 93.406 - Final HHS actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... prescribed in § 93.501, the ORI finding of research misconduct is the final HHS action on the...

  2. 42 CFR 93.406 - Final HHS actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Final HHS actions. 93.406 Section 93.406 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the...

  3. 42 CFR 93.406 - Final HHS actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... prescribed in § 93.501, the ORI finding of research misconduct is the final HHS action on the...

  4. 42 CFR 93.406 - Final HHS actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... prescribed in § 93.501, the ORI finding of research misconduct is the final HHS action on the...

  5. Final Legislative and Budget Actions. Legislative Report No. 3

    ERIC Educational Resources Information Center

    Gaines, Gale F.

    2006-01-01

    The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. The reports include bill numbers and legislative Web site…

  6. 12 CFR 268.109 - Final action by the Board.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... file a civil action in federal district court, the name of the proper defendant in any such lawsuit and the applicable time limits for appeals and lawsuits. If the final order does not fully implement the... district court, the name of the proper defendant in any such lawsuit and the applicable time limits...

  7. 37 CFR 1.113 - Final rejection or action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Applicant and Further Consideration § 1.113 Final rejection or action. (a) On the second or any subsequent... in the case of rejection of any claim (§ 41.31 of this title), or to amendment as specified in §...

  8. 37 CFR 1.113 - Final rejection or action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Applicant and Further Consideration § 1.113 Final rejection or action. (a) On the second or any subsequent... in the case of rejection of any claim (§ 41.31 of this title), or to amendment as specified in §...

  9. Final voluntary release assessment/corrective action report

    SciTech Connect

    1996-11-12

    The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.

  10. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implementation by Sandia and monitoring by DOE. This volume (I) contains the findings and actions concerning the environment. Tables 4.2 and 4.7 summarize the annual costs estimated for completing the actions. The total costs for completion of all the actions are estimated to be $283 million over a 12 year period; the majority of the actions to be completed and costs incurred in the first five years. Resources are provided from DOE-ER/WM, the DOE/DP landlord funds (one time, physical fixes), and from the Sandia Indirect Budget.

  11. Final Consolidated action plan to Tiger Team. Volume 2

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implemenation by Sandia and monitoring by DOE. This volume (2) contains information and corrective action plans pertaining to safety and health and management practices.

  12. 42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or finding of research misconduct. When the final HHS action does not result in a settlement or finding of... 42 Public Health 1 2010-10-01 2010-10-01 false Final HHS action with no settlement or finding...

  13. 22 CFR 134.8 - Official authorized to take final action under the Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Official authorized to take final action under... JUSTICE ACT; IMPLEMENTATION General Provisions § 134.8 Official authorized to take final action under the... authorized to take final action on matters pertaining to the Equal Access to Justice Act as applied to...

  14. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    SciTech Connect

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC).

  15. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document is a compilation of different issues identified by the Tiger Teams at the several locations of the Sandia National Laboratory. In this volume there are findings/concerns and the resultant responses and planned actions for these issues. Also included are the schedules and costs for the planned actions.

  16. Community Action and Urban Institutional Change. A National Evaluation of the Community Action Program. Final Report.

    ERIC Educational Resources Information Center

    Barass, Reitzel, and Associates, Inc., Cambridge, MA.

    Focusing on the Community Action Program, an assessment was made of how much change has occurred in institutions which deal with the poor; what role CAP has played in realizing these changes, which CAP aspects or activities were related to institutional change; and community characteristics which might explain the changes or the role of CAP.…

  17. 77 FR 59035 - Notice of Final Federal Agency Action on Proposed Bridge Rehabilitation and Restoration in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Rehabilitation and... Longfellow Bridge Rehabilitation and Restoration Project in Boston and Cambridge, Massachusetts. The action... final agency action subject to 23 U.S.C. Sec. 139(l)(1) by issuing approval for the following...

  18. 75 FR 37878 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 326... other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a... final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the...

  19. Choosing Actions

    PubMed Central

    Rosenbaum, David A.; Chapman, Kate M.; Coelho, Chase J.; Gong, Lanyun; Studenka, Breanna E.

    2013-01-01

    Actions that are chosen have properties that distinguish them from actions that are not. Of the nearly infinite possible actions that can achieve any given task, many of the unchosen actions are irrelevant, incorrect, or inappropriate. Others are relevant, correct, or appropriate but are disfavored for other reasons. Our research focuses on the question of what distinguishes actions that are chosen from actions that are possible but are not. We review studies that use simple preference methods to identify factors that contribute to action choices, especially for object-manipulation tasks. We can determine which factors are especially important through simple behavioral experiments. PMID:23761769

  20. 77 FR 26601 - Notice of Final Federal Agency Actions on Proposed Highway in Connecticut

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the North Hillside Road Extension in Mansfield, Connecticut. Those actions grant licenses, permits, and approvals for the...

  1. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Administration on December 16, 2011 (76 FR 78332). This notice applies to all Federal agency decisions, actions... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Light Rail Project in... meaning of 23 U.S.C. 139(l)(1). The actions relate to the East Link Light Rail Transit Project in...

  2. 76 FR 31677 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-01

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial... agency actions on the highway project will be barred unless the claim is filed on or before November...

  3. 77 FR 66910 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial... of the Federal agency actions on the highway project will be barred unless the claim is filed on...

  4. 77 FR 37953 - Final Federal Agency Actions on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ... Agency Actions on Proposed Bridge in Massachusetts'' in the Federal Register at 77 FR 1782. The proposed... Federal Highway Administration Final Federal Agency Actions on Proposed Bridge Replacement in... action relates to the proposed Fore River Bridge (State Route 3A over the Weymouth Fore...

  5. 76 FR 9632 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California... Review of Actions by California Department of Transportation (Caltrans) pursuant to 23 U.S.C. 327... Bernardino County, State of California. Those actions grant licenses, permits, and approvals for the...

  6. 77 FR 61825 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-11

    ...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, Willow Road (FAP 305) between Illinois Route 43 (Waukegan Road) and Interstate 94 (Edens Expressway) in Cook County, Illinois. Those actions grant licenses, permits, and approvals for the...

  7. 75 FR 29601 - Notice of Final Federal Agency Actions on a Proposed Highway Project in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ...(1)(1). This action relates to an approval of a proposed highway project corridor. DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(1)(1). A claim... agency actions by issuing approvals for the Placer Parkway Corridor Preservation Project--Tier 1 in...

  8. 39 CFR 960.8 - Official authorized to take final action under the Act.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Official authorized to take final action under the... Official authorized to take final action under the Act. The Postal Service official who renders the final... appeal before the Board of Contract Appeals under part 955 procedures, as the case may be, is...

  9. Intentional Action and Action Slips.

    ERIC Educational Resources Information Center

    Heckhausen, Heinz; Beckmann, Jurgen

    1990-01-01

    An explanation of action slips is offered that examines controlled actions in the context of an intentional behavior theory. Actions are considered guided by mentally represented intentions, subdivided into goal intentions and contingent instrumental intentions. Action slips are categorized according to problem areas in the enactment of goal…

  10. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  11. Environmental Action.

    ERIC Educational Resources Information Center

    Lott, Jesse; Allen, Rodney F.

    This booklet, a general guide to citizen eco-action, discusses a plan of action on community environmental problems. It offers factors to be considered in any community eco-action situation, but it is not a rigid set of rules. An overview identifies seven key ideas of environmental issues, including the universal participation of all humans in the…

  12. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... notice announces actions taken by the FHWA and the USACE that are final within the meaning of 23 U.S.C... given that the USACE has taken final agency actions within the meaning of 23 U.S.C. Sec. 139(l)(1)...

  13. Final Removal Action Report of the CPP-603A Basin Facility

    SciTech Connect

    D. V. Croson

    2007-01-04

    This Final Removal Action Report describes the actions that were taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Bason Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The Removal Action implemented consolidation and recording the location of debris objects containing radioactive cobalt (cobalt-60), removal and management of a small high-activity debris object (SHADO 1), the removal, treatment, and disposal of the basin water at the Idaho CERCLA Disposal Facility (ICDF) evaporation ponds, and filling the basins with grout/controlled low strength material.

  14. 75 FR 18253 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ...The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, State Route 28 between State Route 267 and Chipmunk Street in the community of Kings Beach, in the County of Placer, State of California. Those actions grant licenses, permits, and approvals for......

  15. 75 FR 65052 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-21

    ...The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway interchange project, improvements along State Route 163 (SR-163) at the Friars Road Interchange in the County of San Diego, State of California. Those actions grant licenses,......

  16. 77 FR 48203 - Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139 (I)(1). The actions relate to a proposed highway project, I-77 High Occupancy/Toll (HOT) lanes, from I-277 (Brookshire Freeway) to West Catawba Avenue (Exit 28), Mecklenburg County, North Carolina. Those actions grant licenses, permits, and approvals for the...

  17. 75 FR 43611 - Notice of Final Federal Agency Actions on Proposed Highway in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ...This notice announces actions taken by FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, the SR 502 Corridor Widening Project, in the State of Washington. Those actions grant approval for the project. The project will widen the existing two-lane roadway to four travel lanes with a median for a 5-mile segment of SR 502 between NE......

  18. 78 FR 28282 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ...The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans, USACE and USFWS that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed State Route 41 Madera Passing Lanes project 0.3 miles north of Road 208 to 2.2 miles north of Road 208 in Madera County, in the State of California. Those actions grant licenses, permits, and......

  19. 75 FR 75721 - Notice of Final Federal Agency Actions on Proposed Highway in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ...This notice announces actions taken by FHWA that are final within the meaning of 23 U.S.C. 139(1)(1). The actions relate to a proposed highway project, the WIS 23 Corridor Expansion Project, in the State of Wisconsin. Those actions grant approval for the project. The project will widen the existing two-lane roadway to four travel lanes with a median for an 18.6-mile segment of WIS 23 between......

  20. 17 CFR 1.67 - Notification of final disciplinary action involving financial harm to a customer.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... disciplinary action involving financial harm to a customer. 1.67 Section 1.67 Commodity and Securities... Miscellaneous § 1.67 Notification of final disciplinary action involving financial harm to a customer. (a... transaction for a customer, whether executed or not, and that resulted in financial harm to the customer:...

  1. 76 FR 2949 - Notice of Final Federal Agency Actions on Proposed Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... Construction Project in the State of Washington. Those actions grant approval for the project. DATES: By this... Construction Project. The project includes constructing pontoons sufficient to replace the existing traffic... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Project in...

  2. 77 FR 1782 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Replacement in... within the meaning of 23 U.S.C. 39(l)(1). The action relates to the proposed Fore River Bridge (State... bridge project in the Commonwealth of Massachusetts. The project proposes to replace the...

  3. 77 FR 6622 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Replacement in... within the meaning of 23 U.S.C. 139(l)(1). The action relates to the proposed Whittier Bridge (Interstate... subject to 23 U.S.C. 139(l)(1) by issuing approval for the following bridge/highway improvement project...

  4. 78 FR 40265 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Replacement in... Bridge (Bridge Street over the Mitchell River) Replacement Project in Chatham-Barnstable County... Federal agency actions on the bridge project will be barred unless the claim is filed on or...

  5. 76 FR 61476 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ...: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial Review of... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review... before April 1, 2012. If the Federal law that authorizes judicial review of a claim provides a...

  6. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    SciTech Connect

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

  7. Action Learning.

    ERIC Educational Resources Information Center

    1996

    These four papers were presented at a symposium on action learning moderated by Lex Dilworth at the 1996 conference of the Academy of Human Resource Development. "Developing an Infrastructure for Individual and Organizational Change: Transfer of Learning from an Action Reflection Learning (ARL) Program" (ARL Inquiry) reports findings from a study…

  8. 17 CFR 240.19d-1 - Notices by self-regulatory organizations of final disciplinary actions, denials, bars, or...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... organizations of final disciplinary actions, denials, bars, or limitations respecting membership, association... actions, denials, bars, or limitations respecting membership, association, participation, or access to... relevant. (e) Notice of final denial, bar, prohibition, termination or limitation based on qualification...

  9. 17 CFR 240.19d-1 - Notices by self-regulatory organizations of final disciplinary actions, denials, bars, or...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... organizations of final disciplinary actions, denials, bars, or limitations respecting membership, association... actions, denials, bars, or limitations respecting membership, association, participation, or access to... relevant. (e) Notice of final denial, bar, prohibition, termination or limitation based on qualification...

  10. 17 CFR 240.19d-1 - Notices by self-regulatory organizations of final disciplinary actions, denials, bars, or...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... organizations of final disciplinary actions, denials, bars, or limitations respecting membership, association... actions, denials, bars, or limitations respecting membership, association, participation, or access to... relevant. (e) Notice of final denial, bar, prohibition, termination or limitation based on qualification...

  11. 17 CFR 240.19d-1 - Notices by self-regulatory organizations of final disciplinary actions, denials, bars, or...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... organizations of final disciplinary actions, denials, bars, or limitations respecting membership, association... actions, denials, bars, or limitations respecting membership, association, participation, or access to... relevant. (e) Notice of final denial, bar, prohibition, termination or limitation based on qualification...

  12. 78 FR 11267 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... laws under which such actions were taken, are described in the Final Environmental Assessment (FEA) for..., and in other documents in the FHWA project records. The FEA, FONSI, and other project records...

  13. 46 CFR 504.10 - Time constraints on final administrative actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ENVIRONMENTAL POLICY ANALYSIS § 504.10 Time constraints on final administrative actions. No decision on a... reduced pursuant to 40 CFR 1506.10(d), or unless required by a statutorily-prescribed deadline on...

  14. 46 CFR 504.10 - Time constraints on final administrative actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ENVIRONMENTAL POLICY ANALYSIS § 504.10 Time constraints on final administrative actions. No decision on a... reduced pursuant to 40 CFR 1506.10(d), or unless required by a statutorily-prescribed deadline on...

  15. 46 CFR 504.10 - Time constraints on final administrative actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENVIRONMENTAL POLICY ANALYSIS § 504.10 Time constraints on final administrative actions. No decision on a... reduced pursuant to 40 CFR 1506.10(d), or unless required by a statutorily-prescribed deadline on...

  16. 78 FR 59085 - Notice of Final Federal Agency Action on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ... responsibilities under 23 U.S.C. 327, as well as actions by other Federal agencies, are final within the meaning of..., as well as by other Federal agencies. A claim seeking judicial review of the Federal agency...

  17. 78 FR 70093 - Notice of Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ...This notice announces action taken by the FHWA and other Federal Agencies that is final within the meaning of 23 U.S.C. 139(l)(1). This final agency action relates to a proposed highway project, Bonner Bridge Replacement Project along NC 12, from Rodanthe to Bodie Island in Dare County, North Carolina. The FHWA's Record of Decision (ROD) identifies the Bridge within the Existing NC 12 Easement......

  18. 25 CFR 83.11 - Independent review, reconsideration and final action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... review, reconsideration and final action. (a)(1) Upon publication of the Assistant Secretary's... received by the Board no later than 90 days after the date of publication of the Assistant Secretary's... Secretary's decision shall be final for the Department 90 days after publication of the final...

  19. 25 CFR 83.11 - Independent review, reconsideration and final action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... review, reconsideration and final action. (a)(1) Upon publication of the Assistant Secretary's... received by the Board no later than 90 days after the date of publication of the Assistant Secretary's... Secretary's decision shall be final for the Department 90 days after publication of the final...

  20. Remedial action selection report Maybell, Colorado, site. Final report

    SciTech Connect

    1996-12-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The site is 2.5 mi (4 km) northeast of the Yampa River on relatively flat terrain broken by low, flat-topped mesas. U.S. Highway 40 runs east-west 2 mi (3.2 km) south of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. The site is situated between Johnson Wash to the east and Rob Pit Mine to the west. Numerous reclaimed and unreclaimed mines are in the immediate vicinity. Aerial photographs (included at the end of this executive summary) show evidence of mining activity around the Maybell site. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [ml]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd 3 (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3}(420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}).

  1. Action perception predicts action performance

    PubMed Central

    Bailey, Heather R.; Kurby, Christopher A.; Giovannetti, Tania; Zacks, Jeffrey M.

    2013-01-01

    Everyday action impairments often are observed in demented older adults, and they are common potential barriers to functional independence. We evaluated whether the ability to segment and efficiently encode activities is related to the ability to execute activities. Further, we evaluated whether brain regions important for segmentation also were important for action performance. Cognitively healthy older adults and those with very mild or mild dementia of the Alzheimer's type watched and segmented movies of everyday activities and then completed the Naturalistic Action Test. Structural MRI was used to measure volume in the dorsolateral prefrontal cortex (DLPFC), medial temporal lobes (MTL), posterior cortex, and anterior cingulate cortex (ACC). Dementia status and the ability to segment everyday activities strongly predicted naturalistic action performance, and MTL volume largely accounted for this relationship. In addition, the current results supported the Omission-Commission Model: Different cognitive and neurological mechanisms predicted different types of action error. Segmentation, dementia severity, and MTL volume predicted everyday omission errors, DLPFC volume predicted commission errors, and ACC volume predicted action additions. These findings suggest that event segmentation may be critical for effective action production, and that the segmentation and production of activities may recruit the same event representation system. PMID:23851113

  2. Final consolidated action plan to Tiger Team. Volume 1, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  3. Final consolidated action plan to Tiger Team. Volume 2, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  4. 75 FR 27384 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ...This notice announces actions taken by the FHWA, USACE, and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project to widen State Route 99 from the existing four-lane facility to six lanes from the Austin Road interchange in the City of Manteca (post mile 4.9) to the Arch Road interchange in the City of Stockton (post......

  5. 75 FR 72862 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... announces actions taken by the FHWA and the USACE that are final within the meaning of 23 U.S.C. 139(l)(1...) and are final within the meaning of that law. A claim seeking judicial review of those Federal agency... Indiana'' in the Federal Register at (75 FR 49547) for the Section 3, 25.73 mile I-69 project in...

  6. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final...

  7. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final...

  8. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final...

  9. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final...

  10. Action, human.

    PubMed

    Russo, M T

    2010-01-01

    The term "human action" designates the intentional and deliberate movement that is proper and exclusive to mankind. Human action is a unified structure: knowledge, intention or volition, deliberation, decision or choice of means and execution. The integration between these dimensions appears as a task that demands strength of will to achieve the synthesis of self-possession and self-control that enables full personal realisation. Recently, the debate about the dynamism of human action has been enriched by the contribution of neurosciences. Thanks to techniques of neuroimaging, neurosciences have expanded the field of investigation to the nature of volition, to the role of the brain in decision-making processes and to the notion of freedom and responsibility. PMID:20393686

  11. Action Research

    ERIC Educational Resources Information Center

    Milton-Brkich, Katie Lynn; Shumbera, Kristen; Beran, Becky

    2010-01-01

    Defined as "any systemic inquiry conducted by teachers... for the purpose of gathering information about how their particular schools operate, how they teach, and how their students learn" (Mertler, 2009), "action research" is empowering and professional research done by teachers to inform and improves their own practices. Although there are many…

  12. Citizen's actions

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The role played by individual citizens as consumers of energy was examined, with emphasis on studying ways in which their action could result in energy conservation. It was shown that there are ways that energy can be conserved in this way, with citizens acting either individually or in groups. The potential savings are significant, but the actual savings may be quite small. The citizens need to be motivated to save and to believe in a conservation ethic; developing such an ethic is difficult, and perhaps not responsive to the shotgun approach now being attempted. The true course of action may be to synthesize new societal structures that provide the maximum evolution of culture within the limitation of scarce energy resources.

  13. Actionable Nuggets

    PubMed Central

    McColl, Mary Ann; Aiken, Alice; Smith, Karen; McColl, Alexander; Green, Michael; Godwin, Marshall; Birtwhistle, Richard; Norman, Kathleen; Brankston, Gabrielle; Schaub, Michael

    2015-01-01

    Abstract Objective To present the results of a pilot study of an innovative methodology for translating best evidence about spinal cord injury (SCI) for family practice. Design Review of Canadian and international peer-reviewed literature to develop SCI Actionable Nuggets, and a mixed qualitative-quantitative evaluation to determine Nuggets’ effect on physician knowledge of and attitudes toward patients with SCI, as well as practice accessibility. Setting Ontario, Newfoundland, and Australia. Participants Forty-nine primary care physicians. Methods Twenty Actionable Nuggets (pertaining to key health issues associated with long-term SCI) were developed. Nugget postcards were mailed weekly for 20 weeks to participating physicians. Prior knowledge of SCI was self-rated by participants; they also completed an online posttest to assess the information they gained from the Nugget postcards. Participants’ opinions about practice accessibility and accommodations for patients with SCI, as well as the acceptability and usefulness of Nuggets, were assessed in interviews. Main findings With Actionable Nuggets, participants’ knowledge of the health needs of patients with SCI improved, as knowledge increased from a self-rating of fair (58%) to very good (75%) based on posttest quiz results. The mean overall score for accessibility and accommodations in physicians’ practices was 72%. Participants’ awareness of the need for screening and disease prevention among this population also increased. The usefulness and acceptability of SCI Nugget postcards were rated as excellent. Conclusion Actionable Nuggets are a knowledge translation tool designed to provide family physicians with concise, practical information about the most prevalent and pressing primary care needs of patients with SCI. This evidence-based resource has been shown to be an excellent fit with information consumption processes in primary care. They were updated and adapted for distribution by the Canadian

  14. Androgen action.

    PubMed

    Werner, Ralf; Holterhus, Paul-Martin

    2014-01-01

    Androgens are important for male sex development and physiology. Their actions are mediated by the androgen receptor (AR), a ligand-dependent nuclear transcription factor. The activity of the AR is controlled at multiple stages due to ligand binding and induced structural changes assisted by the foldosome, compartmentalization, recruitment of coregulators, posttranslational modifications and chromatin remodeling, leading to subsequent transcription of androgen-responsive target genes. Beside these short-term androgen actions, there is phenomenological and experimental evidence of long-term androgen programming in mammals and in the human during sensitive programming time windows, both pre- and postnatally. At the molecular level, research into androgen insensitivity syndrome has unmasked androgen programming at the transcriptome level, in genital fibroblasts and peripheral blood mononuclear cells, and at the epigenome level. Androgens are crucial for male sex development and physiology during embryogenesis, at puberty and in adult life. Testosterone and its more potent metabolite, dihydrotestosterone, which is converted from testosterone within the target cell by 5α-reductase II, are the main androgens involved in male sex differentiation. Androgen action is mediated by a single AR. The AR belongs to the nuclear receptor 3 group C, composed of the glucocorticoid receptor (NR3C1), mineralocorticoid receptor (NR3C2), progesterone receptor (NR3C3) and AR (NR3C4), and acts as a ligand-dependent transcription factor. PMID:25247642

  15. 18 CFR 401.90 - Appeals from final Commission action; Time for appeals.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Appeals from final Commission action; Time for appeals. 401.90 Section 401.90 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Administrative and...

  16. 42 CFR 1004.70 - QIO action on final finding of a violation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false QIO action on final finding of a violation. 1004.70 Section 1004.70 Public Health OFFICE OF INSPECTOR GENERAL-HEALTH CARE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OIG AUTHORITIES IMPOSITION OF SANCTIONS ON HEALTH CARE PRACTITIONERS AND PROVIDERS OF HEALTH...

  17. Teens in Action: In Pursuit of Peace Curriculum. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Powers, Stephen; Price-Johnson, Connie

    The purpose of this final report is to provide a description and evaluation to the Camp Fire Greater Arizona Council of the results of Teens in Action: In Pursuit of Peace Curriculum delinquency prevention program. A total of 94 youths in grades 6 through 12 participated in the program in the spring of 2002 at four sites in Chandler. The Student…

  18. 29 CFR 1614.504 - Compliance with settlement agreements and final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Compliance with settlement agreements and final action. 1614.504 Section 1614.504 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL EMPLOYMENT OPPORTUNITY Remedies and Enforcement § 1614.504 Compliance...

  19. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT... concurrence of the DOE if the manager is not an employee of the DOE; (3) Shall, in the event of a...

  20. 42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Final HHS action with no settlement or finding of research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC HEALTH SERVICE POLICIES...

  1. 42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement...

  2. 42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement...

  3. 42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement...

  4. 42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or...

  5. 42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Final HHS action with settlement or finding of research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC HEALTH SERVICE POLICIES...

  6. 42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or...

  7. 76 FR 41554 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ...: 619-688-0224, e-mail: david.nagy@dot.ca.gov . SUPPLEMENTARY INFORMATION: Effective July 1, 2007, the..., Federal Highway Administration, Sacramento, California. BILLING CODE 4910-RY-P ... Caltrans, that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a...

  8. Final Actions in Arkansas, Kentucky, Maryland, Mississippi, Virginia and West Virginia. Legislative Report No. 3

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2007

    2007-01-01

    The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. The reports include bill numbers and legislative Web site…

  9. Final Actions in Florida, Georgia, Oklahoma and Texas. Legislative Report No. 4

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2007

    2007-01-01

    The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. The reports include bill numbers and legislative Web site…

  10. 10 CFR 202.24 - Final action by the appropriate DOE official.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 202.24 Energy DEPARTMENT OF ENERGY OIL PRODUCTION OR DISCLOSURE OF MATERIAL OR INFORMATION Production or Disclosure in Response to Subpoenas or Demands of Courts or Other Authorities § 202.24 Final action by the appropriate DOE official. If the General Counsel approves a demand for the production...

  11. 10 CFR 202.24 - Final action by the appropriate DOE official.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 202.24 Energy DEPARTMENT OF ENERGY OIL PRODUCTION OR DISCLOSURE OF MATERIAL OR INFORMATION Production or Disclosure in Response to Subpoenas or Demands of Courts or Other Authorities § 202.24 Final action by the appropriate DOE official. If the General Counsel approves a demand for the production...

  12. 10 CFR 202.24 - Final action by the appropriate DOE official.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 202.24 Energy DEPARTMENT OF ENERGY OIL PRODUCTION OR DISCLOSURE OF MATERIAL OR INFORMATION Production or Disclosure in Response to Subpoenas or Demands of Courts or Other Authorities § 202.24 Final action by the appropriate DOE official. If the General Counsel approves a demand for the production...

  13. 10 CFR 202.24 - Final action by the appropriate DOE official.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 202.24 Energy DEPARTMENT OF ENERGY OIL PRODUCTION OR DISCLOSURE OF MATERIAL OR INFORMATION Production or Disclosure in Response to Subpoenas or Demands of Courts or Other Authorities § 202.24 Final action by the appropriate DOE official. If the General Counsel approves a demand for the production...

  14. 42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or...

  15. 42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or...

  16. Essential Communication and Documentation Skills. Module: Final Assessment and Action Planning.

    ERIC Educational Resources Information Center

    Medina, Muriel; And Others

    This module is the 10th of 10 in the Essential Communication and Documentation Skills curriculum. It develops final assessment and action planning, workplace literacy skills identified as being directly related to the job of the direct care worker. The curriculum is designed to improve the competence of New York State Division for Youth direct…

  17. 42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures...

  18. 42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures...

  19. 42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures...

  20. 77 FR 55896 - Notice of Final Federal Agency Actions on Loop 1 in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ... Act (FPPA) [7 U.S.C. 4201- 4209]. 7. Wetlands and Water Resources: Clean Water Act (Section 404, Section 401, Section 319) ; Land and Water Conservation Fund (LWCF) ; Safe Drinking Water Act (SDWA) [42 U... Federal Highway Administration Notice of Final Federal Agency Actions on Loop 1 in Texas AGENCY:...

  1. 76 FR 44649 - Notice of Final Federal Agency Actions on Proposed Highway in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... 1899 ; and Land and Water Conservation Fund . 8. Executive Orders: E.O. 11990 Protection of Wetlands; E... ; Farmland Protection Policy Act [7 U.S.C. 4201-4209]. 7. Wetlands and Water Resources: Clean Water Act [33 U... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Texas...

  2. 78 FR 58381 - Notice of Final Federal Agency Actions on State Highway 288 in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... U.S.C. 4201-4209]. 7. Wetlands and Water Resources: Clean Water Act, 33 U.S.C. 1251- 1387; Land and Water Conservation Fund (LWCF), 16 U.S.C. 4601-4604. 8. Executive Orders: E.O. 11990 Protection of... Federal Highway Administration Notice of Final Federal Agency Actions on State Highway 288 in Texas...

  3. A Plutonium Finishing Plant Model for the Cercla Removal Action and Decommissioning Construction Final Report

    SciTech Connect

    Hopkins, A.

    2008-07-01

    The joint policy between the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE) for decommissioning buildings at DOE facilities documents an agreement between the agencies to perform decommissioning activities including demolition under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The use of removal actions for decommissioning integrates EPA oversight authority, DOE lead agency responsibility, and state authority for decommissioning activities. Once removal actions have been performed under CERCLA, a construction completion report is required to document the completion of the required action. Additionally, a decommissioning report is required under DOE guidance. No direct guidance was found for documenting completion of decommissioning activities and preparing a final report that satisfies the CERCLA requirements and the DOE requirements for decommissioning. Additional guidance was needed for the documentation of construction completion under CERCLA for D and D projects undertaken under the joint policy that addresses the requirements of both agencies. A model for the construction completion report was developed to document construction completion for CERCLA D and D activities performed under the joint EPA/DOE policy at the Plutonium Finishing Plant (PFP). The model documentation report developed at PFP integrates the DOE requirements for establishing decommissioning end-points, documenting end-point completion and preparing a final decommissioning report with the CERCLA requirements to document completion of the action identified in the Action Memorandum (AM). The model includes the required information on health and safety, data management, cost and schedule and end-points completion. (authors)

  4. 77 FR 32172 - Environmental Assessment: Notice of Final Federal Actions on Improvements to U.S. 60 in Union and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ... are final within the meaning of 23 U.S.C. 139(1)(1). The actions relate to a proposed highway project... advising the public of final actions subject to 23 U.S.C. 139(1)(1). A claim seeking judicial review of the... INFORMATION: Notice is hereby given that the FHWA has taken final agency actions subject to 23 U.S.C....

  5. Grand Junction remedial action program. Analysis of currently approved and proposed procedures for establishing eligibility for remedial action. Final report

    SciTech Connect

    1980-12-01

    This analysis of the Grand Junction Remedial Action Program has been undertaken at the request of the Department of Energy (DOE) in response to proposals submitted by the Colorado Department of Health (CHD). In essence those proposals are for approval by DOE of alternative procedures for establishing the eligibility of structures for remedial action. Regardless of the preeminence accorded the RPISU method in the regulation, it is appropriate to question the assumption that this method gives better estimates of average long-term exposure than other potential methods of evaluation. The objectives here are to (1) review the reliability of the methods of measurement authorized by 10 CFR 12, i.e. the RPISU 6 sample method for determining RDC and the presumptive tests based on the indoor net average gamma exposure rate; (2) evaluate the reliability of the alternative measurement methods proposed by the CDH for determining eligibility for remedial action; and (3) recommend for DOE approval specific methods and applicable procedures that may be used to determine eligibility for remedial action with at least the same reliability as presently achieved with the RPISU 6 sample method.

  6. Final Action Plan to Tiger Team. Environmental, safety and health assessment

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  7. Action Learning: Avoiding Conflict or Enabling Action

    ERIC Educational Resources Information Center

    Corley, Aileen; Thorne, Ann

    2006-01-01

    Action learning is based on the premise that action and learning are inextricably entwined and it is this potential, to enable action, which has contributed to the growth of action learning within education and management development programmes. However has this growth in action learning lead to an evolution or a dilution of Revan's classical…

  8. Industrial Sites Project Establishment of Final Action Levels, Rev. No.: 0

    SciTech Connect

    Boehlecke, Robert F.

    2006-02-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  9. Final Actions in Arkansas; Governors' Proposals in Alabama, Delaware, Florida, Louisiana, Oklahoma, Tennessee and Virginia. Legislative Report No. 2

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2010

    2010-01-01

    The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. This report presents final legislative and budget actions in…

  10. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  11. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    SciTech Connect

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE.

  12. 78 FR 52999 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... Review of Actions by FHWA and United States Fish and Wildlife Service (USFWS), DOI. ] SUMMARY: This... Actions by FHWA and United States Fish and Wildlife Service (USFWS), DOI, was published in the Federal... Judicial Review of these actions and decisions by the USFWS, DOI, was published in the Federal Register...

  13. 76 FR 60583 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... Review of Actions by FHWA and United States Fish and Wildlife Service (USFWS), DOI. SUMMARY: This notice... Actions by FHWA and United States Fish and Wildlife Service (USFWS), DOI, was published in the Federal... these actions and decisions by the USFWS, DOI, was published in the Federal Register on April 17,...

  14. 76 FR 51462 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ...: Federal Highway Administration (FHWA), USDOT. ACTION: Notice of Limitation on Claims for Judicial Review... actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions that... the Federal law that authorizes judicial review of a claim provides a time period of less than...

  15. 78 FR 58382 - Notice of Final Federal Agency Actions on the Proposed U.S. 50 Study Crossing Over Sinepauxent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The action relates to the U.S. 50 Crossing over Sinepauxent Bay Study from MD 611 to MD 378 and 5th Street to Somerset Street located in the Town of Ocean City, Worcester County, Maryland. This action grants approval for the...

  16. 37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Reply by applicant or patent owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES National Processing Provisions Action by...

  17. 76 FR 45649 - Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange Project: Jackson County, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... Federal Highway Administration Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange... the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, I-5: Fern Valley... Administration, 530 Center Street, NE., Suite 420, Salem, Oregon 97301, Telephone: (503) 316-2559. The I-5:...

  18. 77 FR 65929 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River.... Sec. 139(l)(1). The actions relate to the Tappan Zee Hudson River Crossing Project located in Rockland... the following highway project in the State of New York: Tappan Zee Hudson River Crossing...

  19. 78 FR 27473 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... (New NY Bridge) Project in New York, in the Federal Register at FR Doc. 2012-26799. Tappan Zee Hudson... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River... within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the Tappan Zee Hudson River...

  20. 76 FR 54288 - Notice of Final Federal Agency Actions on Proposed Bridge and Approach Roadways in Nevada and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Bridge and Approach... proposed Laughlin-Bullhead City Bridge project in Laughlin, Clark County, Nevada; and in Bullhead City... claim seeking judicial review of the Federal agency actions on the bridge and roadway project will...

  1. 78 FR 42151 - Notice of Final Federal Agency Actions on the Goethals Bridge Replacement Project in New York and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Goethals Bridge Replacement... meaning of 23 U.S.C. 139(l)(1). The actions relate to the Goethals Bridge Replacement Project located in... New York and New Jersey: Goethals Bridge Replacement Project. The Goethals Bridge provides a...

  2. The Impact of the Community Action Program on Institutional Change; Assistance to Community Organization as a Successful Strategy. Final Report.

    ERIC Educational Resources Information Center

    Vanecko, James J.; Jacobs, Bruce

    Part of a Community Action Program (CAP) final report evaluating the effects of community action agencies (CAAs) on institutional change, these appendixes analyze various dependent and independent variables, including social services, public schools, employment, neighborhood and community political organizations, CAP pressure and impact,…

  3. 78 FR 26104 - Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Federal Highway Administration Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road... project, OR 62: I-5 to Dutton Road (Medford) in Jackson County, Oregon. This action grants approval for...: (503) 231-6179. The OR62: I-5 to Dutton Road Environmental Impact Statement (EIS) is available...

  4. 37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED... National Processing Provisions Action by Applicant and Further Consideration § 1.111 Reply by applicant or...) Supplemental replies. (i) A reply that is supplemental to a reply that is in compliance with § 1.111(b)...

  5. 37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED... National Processing Provisions Action by Applicant and Further Consideration § 1.111 Reply by applicant or...) Supplemental replies. (i) A reply that is supplemental to a reply that is in compliance with § 1.111(b)...

  6. 76 FR 26336 - Notice of Final Federal Agency Actions on the Proposed Klingle Valley Trail in Washington, DC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Proposed Klingle Valley Trail...)(1). The actions relate to the proposed Klingle Valley Trail project in Northwest Washington, DC... Northwest Washington, DC: The Klingle Valley Trail project. The project includes construction of a...

  7. 76 FR 68810 - Notice of Final Federal Agency Actions on Farm-to-Market 1626 in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ... and Water Resources: Clean Water Act [33 U.S.C. 1251- 1342]; Land and Water Conservation Fund (LWCF... Federal Highway Administration Notice of Final Federal Agency Actions on Farm-to-Market 1626 in Texas... Lane in Hays and Travis Counties, Texas. Those actions grant licenses, permits, and approvals for...

  8. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    SciTech Connect

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete.

  9. 75 FR 36151 - Notice of Final Federal Agency Actions on Proposed Highway in California; Notice of Statute of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... the laws under which such actions were taken, are described in the Final Environmental Assessment (FEA..., 2010, and in other documents in the FHWA project records. The FEA, FONSI, and other project records...

  10. The Take Action Project

    ERIC Educational Resources Information Center

    Boudreau, Sue

    2010-01-01

    The Take Action Project (TAP) was created to help middle school students take informed and effective action on science-related issues. The seven steps of TAP ask students to (1) choose a science-related problem of interest to them, (2) research their problem, (3) select an action to take on the problem, (4) plan that action, (5) take action, (6)…

  11. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    SciTech Connect

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE`s satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson.

  12. 76 FR 78332 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... Review of Actions by California Department of Transportation (Caltrans) pursuant to 23 U.S.C. 327... seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before June 13, 2012. If the Federal law that authorizes judicial review of a...

  13. 75 FR 49547 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... 25, 2010 (75 FR 8786-01). A claim seeking judicial review of the Tier 2, Section 3 decisions must be... Review of Actions by FHWA, United States Fish and Wildlife Service (USFWS), DOI, and United States Army... Notice of Limitation on Claims for Judicial Review of these actions and decisions by the USFWS, DOI,...

  14. 75 FR 8786 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... Review of Actions by FHWA and United States Fish and Wildlife Service (USFWS), DOI. SUMMARY: This notice... States Fish and Wildlife Service (USFWS), DOI, was published in the Federal Register on April 17, 2007. A... Notice of Limitation on Claims for Judicial Review of these actions and decisions by the USFWS, DOI,...

  15. 75 FR 59787 - Notice of Final Federal Agency Actions on Proposed Highway in New Hampshire

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-28

    ... Agency Actions on the Proposed Highway in New Hampshire'' in the Federal Register at 72 FR 30047-01 for... interchange in the City of Manchester. Those actions grant licenses, permits, and approvals for the project...-mile segment of the Interstate 93 corridor between Salem and Manchester, New Hampshire....

  16. 76 FR 37392 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-27

    ... judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before December 27, 2011. If the Federal law that authorizes judicial review of a claim... AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for...

  17. 78 FR 10249 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ...). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before July 13, 2013. If the Federal law that authorizes judicial review... AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for...

  18. 75 FR 62919 - Notice of Final Federal Agency Actions on Proposed Highway in Vermont

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the... that authorizes judicial review of a claim provides a time period of less than 180 days for filing such... AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims for...

  19. 76 FR 80447 - Notice of Final Federal Agency Actions on Proposed Highways in Montana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies. SUMMARY: This notice...(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before June 20, 2012. If the Federal law that authorizes...

  20. 75 FR 28851 - Notice of Final Federal Agency Actions on Proposed Highway in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-24

    ... subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the... this notice. If the Federal law that authorizes judicial review of a claim provides a time period of... AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims for...

  1. 78 FR 58380 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before February 20, 2014. If the Federal law that authorizes judicial review of a claim... AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims for...

  2. 78 FR 64595 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before March 28, 2014. If the Federal law that authorizes judicial review of a... AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for...

  3. Final record of decision/remedial action plan, nine sites, Sierra Army Depot, Lassen County, California

    SciTech Connect

    Arroyo, S.L.; Larson, A.M.; Parent, M.M.; Silvers, J.M.; Weaverling, P.H.

    1996-10-01

    This ROD/RAP presents the selected response actions for nine sites at SIAD. The response actions were selected by the US Department of the Army (Army) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments Reauthorization Act of 1986 (SARA)(collectively referred to as CERCLA), the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), and Section 6.8 of the California Health and Safety Code. This ROD/RAP includes the factual and legal basis for selecting the response action at each of the nine sites listed above. The data used to support the selected response action are contained in the Administrative Record for each site. The State of California as represented by the Department of Toxic Substances Control (DTSC), and the Lahontan Regional Water Quality Control Board (RWQCB) concur with the selected response action at each site.

  4. Council actions

    NASA Astrophysics Data System (ADS)

    At its Spring meeting in Washington, D.C., the AGU Council on 30 May gave first approval to change Union Bylaws 7 and 11 and to add a new Bylaw 8. The new bylaw gives formal recognition to Focus Groups as distinct in character and mission from committees. Focus Groups are intended to be cohesive groups of members who focus on scientific problems, issues, or techniques. They will address both long-standing and "hot" topics, as well as specific techniques and applications that cut across several Sections. More information on AGU Focus Groups can be found at http://wwwagu.org/inside/insidaguco.html. The other changes allow Union members to affiliate with Focus Groups, remove the requirement that all members have a primary affiliation with a Section, and provide for terms of appointment beyond a sitting president's term with consent of the president-elect. Member comment is being sought before the Council considers final approval of these changes in December. (See next page.)

  5. 75 FR 10015 - Notice of Final Federal Agency Actions on the Interchange of State Loop 1604 and United States...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, the interchange of Texas State Loop 1604 (LP 1604) with United States Highway 281 (US 281). Project limits on LP 1604 are from Bitters Road to Redland Road and on US 281 are from LP 1604 to Bitters Road in Bexar......

  6. 78 FR 64593 - Notice of Final Federal Agency Actions on US 26: MP 49.20-MP 57.45 Project: Clackamas County, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ...This notice announces final environmental actions taken by the FHWA, USACE, USFS, USF&WS, NMFS and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, US 26: MP 49.20-MP 57.45. This action grants approval for the...

  7. Action Learning at Work.

    ERIC Educational Resources Information Center

    Mumford, Alan, Ed.

    This book contains 34 papers examining the theory, process, and outcomes of action learning at work. The following papers are included: "An Introduction to the Text" (Alan Mumford); "The Learning Equation" (Reg Revans); "Action Learning as a Vehicle for Learning" (Alan Mumford); "Placing Action Learning and Action Research in Context" (Cliff…

  8. Action Research Facilitator's Handbook.

    ERIC Educational Resources Information Center

    Caro-Bruce, Cathy

    This handbook is a roadmap for action research facilitators to help groups as they work through the research process. It offers quotations, handouts, strategies, resources, and insights from actual experiences. The sections of the handbook follow the action research cycle, focusing on: "What is Action Research?"; "What is the Action Research…

  9. Revised Total Coliform Rule Assessments and Corrective Actions Guidance Manual, Interim Final

    EPA Science Inventory

    The guidance manual provides information on how to conduct assessments to identify the causes of total coliform and E. coli occurrence in the distribution system, and on the corresponding corrective actions that systems can take to correct the problem.

  10. 77 FR 14464 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ...-94, I-894, and U.S. Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin. Those actions grant.... Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin, Project I.D. 1060-33-01. The project...

  11. 78 FR 25524 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... project would improve safety and operations, local road access to State Route 156, interregional traffic flow along State Route 156 and relieve existing congestion. The actions by the Federal agencies,...

  12. Inferences about Action Engage Action Systems

    ERIC Educational Resources Information Center

    Taylor, Lawrence J.; Lev-Ari, Shiri; Zwaan, Rolf A.

    2008-01-01

    Verbal descriptions of actions activate compatible motor responses [Glenberg, A. M., & Kaschak, M. P. (2002). Grounding language in action. "Psychonomic Bulletin & Review, 9", 558-565]. Previous studies have found that the motor processes for manual rotation are engaged in a direction-specific manner when a verb disambiguates the direction of…

  13. Remedial-Action Costing procedures manual. Final report, January 1985-September 1986

    SciTech Connect

    Burgher, B.; Culpepper, M.; Zieger, W.

    1987-10-01

    This manual provides specific procedures for the cost estimating and economic analysis steps required for preparing engineering cost estimates for selecting remedial-action alternatives in response to the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the National Contingency Plan (40 CFR 300). The manual is designed to be used in conjunction with EPA's manual entitled Guidance on Feasibility Studies Under CERCLA (1985). The audience for the manual includes EPA Regional Project Officers, remedial investigation/feasibility study contractors, and state and local remedial action personnel and other Federal agencies. Detailed procedures are provided for generating estimated capital and annual operating costs, calculating annual costs and present worth for each remedial-action alternative, and performing sensitivity analyses of the cost estimates to determine the impact of changes to various cost input parameters. Worksheets are provided to assist the user in developing the feasibility cost analyses. An example cost analysis is provided to illustrate these procedures.

  14. Final corrective action study for the former CCC/USDA facility in Ramona, Kansas.

    SciTech Connect

    LaFreniere, L. M.

    2011-04-20

    Past operations at a grain storage facility formerly leased and operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in Ramona, Kansas, resulted in low concentrations of carbon tetrachloride in groundwater that slightly exceed the regulatory standard in only one location. As requested by the Kansas Department of Health and Environment, the CCC/USDA has prepared a Corrective Action Study (CAS) for the facility. The CAS examines corrective actions to address groundwater impacted by the former CCC/USDA facility but not releases caused by other potential groundwater contamination sources in Ramona. Four remedial alternatives were considered in the CAS. The recommended remedial alternative in the CAS consists of Environmental Use Control to prevent the inadvertent use of groundwater as a water supply source, coupled with groundwater monitoring to verify the continued natural improvement in groundwater quality. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) has directed Argonne National Laboratory to prepare a Corrective Action Study (CAS), consistent with guidance from the Kansas Department of Health and Environment (KDHE 2001a), for the CCC/USDA grain storage facility formerly located in Ramona, Kansas. This effort is pursuant to a KDHE (2007a) request. Although carbon tetrachloride levels at the Ramona site are low, they remain above the Kansas Tier 2 risk-based screening level (RBSL) and the U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 5 {micro}g/L (Kansas 2003, 2004). In its request for the CAS, the KDHE (2007a) stated that, because of these levels, risk is associated with potential future exposure to contaminated groundwater. The KDHE therefore determined that additional measures are warranted to limit future use of the property and/or exposure to contaminated media as part of site closure. The KDHE further requested comparison of at least two corrective

  15. 75 FR 80107 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Actions on Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Statute of Limitations on Claims; Notice of Final Federal Agency...: Notice of Limitation on Claims for Judicial Review of Actions by the California Department...

  16. 78 FR 26739 - Notice of Final Action on Petition From Earthjustice To List Coal Mines as a Source Category and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... AGENCY 40 CFR Part 63 Notice of Final Action on Petition From Earthjustice To List Coal Mines as a Source Category and To Regulate Air Emissions From Coal Mines AGENCY: Environmental Protection Agency (EPA..., the Acting EPA Administrator, Bob Perciasepe, signed a letter denying a petition to add coal mines...

  17. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock... a proposed highway project, Sunrise Project, I-205 to Rock Creek Junction, Clackamas County, Oregon..., NE., Suite 100, Salem, Oregon 97301, Telephone: (503) 587-4716. The Sunrise Project, I-205 to...

  18. 75 FR 60164 - Notice of Final Federal Agency Actions on Proposed Shared-Use Path in New York State

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... relate to a proposed Shared-Use Path Construction Project: PIN 4760.35 Auburn Trail Extension, Town of... the connection to Powder Mills Park of 2.5 miles. The project primarily provides for the construction... project. DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23...

  19. 77 FR 66215 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York Correction In notice document 2012-26799, appearing on page 65929 in the...

  20. 77 FR 71207 - Notice of Final Federal Agency Actions on Proposed Highway and Bridge in the Cities of Cincinnati...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-29

    ... on November 2, 2012, at 77 FR 66215. That notice provided an incorrect reference to a statute of...: (513) 933-6639. SUPPLEMENTARY INFORMATION: On November 2, 2012, at 77 FR 66215, the FHWA published a... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway and Bridge...

  1. Final Actions in Delaware, Louisiana, Tennessee, Texas and West Virginia; Notes from Other SREB States. Legislative Report No. 5

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2009

    2009-01-01

    The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. The reports include bill numbers and legislative Web site…

  2. Final Actions in Alabama, Arkansas, Florida, Maryland and Virginia; Notes from Other SREB States. Legislative Report No. 4

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2009

    2009-01-01

    The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. The reports include bill numbers and legislative Web site…

  3. Final Actions in Alabama, South Carolina and Tennessee. Updates from Florida, Maryland and Texas. Legislative Report No. 5

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2007

    2007-01-01

    The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. The reports include bill numbers and legislative Web site…

  4. Final Actions in Delaware, Louisiana and North Carolina. Updates from Florida and Virginia. Legislative Report No. 6

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2007

    2007-01-01

    The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. The reports include bill numbers and legislative Web site…

  5. 75 FR 45695 - Final Federal Agency Actions on Trans-Texas Corridor 35 (TTC-35) in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... Policy Act (FPPA) [7 U.S.C. 4201-4209]. 7. Wetlands and Water Resources: Clean Water Act, 33 U.S.C. 1251- 1342; Land and Water Conservation Fund (LWCF), 16 U.S.C. 4601-4604. 8. Executive Orders: E.O. 11990... Federal Highway Administration Final Federal Agency Actions on Trans-Texas Corridor 35 (TTC-35) in...

  6. Action Research: Measuring Literacy Programme Participants' Learning Outcomes. Results of the Final Phase (2011-2014)

    ERIC Educational Resources Information Center

    Bolly, Madina; Jonas, Nicolas

    2015-01-01

    Action Research on Measuring Literacy Programme Participants' Learning Outcomes (RAMAA) aims to develop, implement and collaborate on the creation of a methodological approach to measure acquired learning and study the various factors that influence its development. This report examines how RAMAA I has been implemented over the past four years in…

  7. 77 FR 52108 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... Hills Parkway in the city of St. George, Washington County, Utah. The project will include widening of... proposed highway project, State Route 18 (Bluff Street); from St. George Boulevard to Red Hills Parkway, in Washington County in the State of Utah. Those actions grant licenses, permits, and approvals for the...

  8. 78 FR 17748 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... MP 16 project in Washington County in the State of Utah. These actions grant approvals for the... and MP 16 in Washington County, Utah. The project consists of the following improvements: Constructing..., between Brigham Road and Dixie Drive, and between Washington Parkway and SR-9; removing the...

  9. 75 FR 62182 - Notice of Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... Cumberland, Sampson, and Duplin Counties, North Carolina (T.I.P Project R-2303). Those actions grant licenses... Bern Avenue, Ste 410, Raleigh, North Carolina, 27601-1418; Telephone: (919) 747-7014; e-mail: clarence.coleman@dot.gov . FHWA North Carolina Division Office's normal business hours are 8 a.m. to 5...

  10. 77 FR 17565 - Notice of Final Federal Agency Actions on Proposed Transportation Improvements in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... West Project) in Draper, Salt Lake County in the State of Utah. These actions grant licenses, permits... in the State of Utah: The Bangerter 600 West Project in Draper, Salt Lake County, Utah, project... Railroad (UPRR) line at about 900 West in the city of Draper in Salt Lake County. The Selected...

  11. 77 FR 17564 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... Lake County in the State of Utah). These actions grant licenses, permits, and approvals for the project... of Utah: Cottonwood Street; 4500 South to Vine Street in Murray City, Salt Lake County, project..., Environmental Program Manager, Federal Highway Administration, 2520 West 4700 South, Suite 9A, Salt Lake...

  12. 77 FR 66500 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... the City of Riverside, in the counties of Orange and Riverside, State of California. Those actions... to Pierce Street in the City of Riverside. The existing express lanes in Orange County will be extended east from the Orange/County line to Interstate 15 (I-15) in the City of Corona. The existing...

  13. 75 FR 70349 - Notice of Final Federal Agency Actions on Proposed Highways in Alaska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... Highway from Lucus Road to Big Lake Road, in the Matanuska-Susitna Borough, State of Alaska. Those actions... improvements between Lucus Road and Big Lake Road, a distance of approximately eight miles. The five-lane section east of the project would be extended one mile west from Lucus Road to Church Road and...

  14. 77 FR 5617 - Notice of Final Federal Agency Action on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... through Friday, 7:30 a.m. to 4:30 p.m. MST. SUPPLEMENTARY INFORMATION: Notice is hereby given that the... Protection Act . 8. Executive Orders: E.O. 11990, Protection of Wetlands; E.O. 11988, Floodplain Management; E.O. 12898, Federal Actions to address Environmental Justice in Minority Populations and Low...

  15. 77 FR 58906 - Notice of Final Federal Agency Actions on Proposed Highway in Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ...)(1). The actions relate to a proposed highway project on I-90 over the Mississippi River. The... River with a new bridge that meets structural and geometric standards as well as reconstruction of the I...: I-90 Bridge over the Mississippi River and I-90/U.S. 14/U.S. 61 approach roadway interchange....

  16. 76 FR 2948 - Notice of Final Federal Agency Actions on Proposed Highway in Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... Wing County) to the County Road 2/42 intersection in Pine River (Cass County), Minnesota. Those actions... County Road 2/42 intersection in Pine River. The project is located in Crow Wing and Cass Counties. A Record of Decision (ROD) for the TH 371 corridor from Nisswa to Pine River was signed by FHWA in 2005....

  17. 76 FR 43372 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... April 17, 2007 (at 72 FR 19228-02). A claim seeking judicial review of the Tier 1 decisions must have... the Federal Register (at 73 FR 6241- 01) for the Section 1, 13.1 mile segment of I-69 in the Counties... Review of Actions by FHWA, United States Fish and Wildlife Service (USFWS), DOI, and United States...

  18. 76 FR 65776 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ...). The actions relate to a proposed highway project, US 41 (Memorial Drive to County M) in Brown County... Department of Transportation, US 41 Brown County Project Office, 1940 West Mason Street, Green Bay, Wisconsin... approvals for the following highway project: US 41 (Memorial Drive to County M), Brown County,...

  19. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... actions relate to a proposed highway and transit project within the Tier 1 Elgin O'Hare--West Bypass study... Elgin O'Hare Expressway on the west and located in Cook and DuPage Counties in Illinois just northwest... within the Elgin O'Hare--West Bypass study area in Cook and DuPage Counties in Illinois. Decisions in...

  20. 77 FR 75254 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... actions relate to a proposed highway and transit project within the Tier 2 Elgin O'Hare--West Bypass project corridor, which is located along the Elgin-O'Hare Expressway/Thorndale ] Avenue between Chicago O'Hare International Airport (O'Hare) and Lake Street/US Route 20, and on a proposed alignment...

  1. 77 FR 48586 - Notice of Final Federal Agency Actions on United States Highway 77

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-14

    ... Corpus Christi, Texas to US 83 in Harlingen, Texas. Those actions grant licenses, permits, and approvals..., Room 826, Austin, Texas 78701; telephone: (512) 536-5960; email: gregory.punske@dot.gov . The FHWA Texas Division Office's normal business hours are 7:45 a.m. to 4:15 p.m. (central time) Monday...

  2. 75 FR 54420 - Notice of Final Federal Agency Actions on US 290/Hempstead Corridor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    ... Protection Policy Act (FPPA) [7 U.S.C. 4201-4209]. 7. Wetlands and Water Resources: Clean Water Act [33 U.S.C. 1251- 1342]; Land and Water Conservation Fund (LWCF) . 8. Executive Orders: E.O. 11990 Protection of...) in Harris County, Texas. Those actions grant licenses, permits, and approvals for the...

  3. 76 FR 1664 - Notice of Final Federal Agency Actions on State Highway 99 (Segment G)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... and Water Resources: Clean Water Act [33 U.S.C. 1251- 1342]; Land and Water Conservation Fund (LWCF... 45 (I-45) to US 59 in Harris and Montgomery Counties, Texas. Those actions grant licenses, permits... Street, Room 826 Austin, Texas 78701; telephone: (512) 536-5960; e- mail: gregory.punske@dot.gov ....

  4. 77 FR 24255 - Notice of Final Federal Agency Actions on Proposed Highways in Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency... October 22, 2012. If the Federal law that authorizes judicial review of a claim provides a time period of... given by the Federal Transit Administration on September 23, 2010 related to U.S. 36 (75 FR 58017)....

  5. 77 FR 6171 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... segments. The existing two-lane, two-span, steel stringer/multi-beam bridge would be replaced with a two....C. 139(l)(1). The actions relate to a proposed local assistance bridge replacement project on Main... Creek Bridge Replacement Project on Main Street (former State Route 49) in Amador City, Amador...

  6. A Toolkit for Action Research

    ERIC Educational Resources Information Center

    Alber, Sandra M.

    2010-01-01

    This book facilitates the completion of action research studies by providing a series of tasks that guide action researchers from the beginning of a project and selecting a topic for study, to completion of the project and editing final reports. All too often, students and practicing professionals in professional development schools are…

  7. Putting Action in Perspective

    ERIC Educational Resources Information Center

    Lozano, Sandra C.; Hard, Bridgette Martin; Tversky, Barbara

    2007-01-01

    Embodied approaches to cognition propose that our own actions influence our understanding of the world. Do other people's actions also have this influence? The present studies show that perceiving another person's actions changes the way people think about objects in a scene. In Study 1, participants viewed a photograph and answered a question…

  8. Conservation Action Handbook.

    ERIC Educational Resources Information Center

    National Rifle Association, Washington, DC.

    Conservation problems are identified, with some suggestions for action. General areas covered are: Wildlife Conservation, Soil Conservation, Clean Water, Air Pollution Action, and Outdoor Recreation Action. Appendices list private organizations or agencies concerned with natural resource use and/or management, congressional committees considering…

  9. Action in Development

    ERIC Educational Resources Information Center

    von Hofsten, Claes

    2007-01-01

    It is argued that cognitive development has to be understood in the functional perspective provided by actions. Actions reflect all aspects of cognitive development including the motives of the child, the problems to be solved, and the constraints and possibilities of the child's body and sensorimotor system. Actions are directed into the future…

  10. Planning as Action Research

    ERIC Educational Resources Information Center

    de Gonzalez, Carmen Beatriz; Hernandez, Teresa; Kusch, Jim; Ryan, Charly

    2004-01-01

    Planning contains so much more than the written plan. Early in 2000, an invitation came from the Collaborative Action Research Network (CARN), to people experienced in action research who might want to help plan and present an action research event for elementary school science teachers in Venezuela, South America, in Autumn 2000. This article…

  11. Participatory Action Research.

    ERIC Educational Resources Information Center

    Walker, Martha Lentz

    1993-01-01

    Describes aspects of participatory action research and considers advantages of using participatory action research in research by disabilities and rehabilitation researchers. Notes that participatory action research can be built into any rehabilitation research design but that it rests upon the recognition of persons with disabilities as integral…

  12. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    SciTech Connect

    Not Available

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

  13. Understanding affirmative action.

    PubMed

    Crosby, Faye J; Iyer, Aarti; Sincharoen, Sirinda

    2006-01-01

    Affirmative action is a controversial and often poorly understood policy. It is also a policy that has been widely studied by social scientists. In this review, we outline how affirmative action operates in employment and education settings and consider the major points of controversy. In addition, we detail the contributions of psychologists and other social scientists in helping to demonstrate why affirmative action is needed; how it can have unintended negative consequences; and how affirmative action programs can be most successful. We also review how psychologists have examined variations in people's attitudes toward affirmative action, in part as a means for testing different theories of social behavior. PMID:16318608

  14. International energy cooperation: The mismatch between IEA policy actions and policy goals: (Final report)

    SciTech Connect

    Smith, R.T.

    1985-01-01

    This analysis discusses the link, if any, between IEA policy actions and stated goals of the Program. Understanding the reasons for success or failure of IEA actions identifies which policies achieve real gains from international energy cooperation, and which are counterproductive. Section I is an overview of the structural framework of the IEA. Section II describes the institutional and organizational background, including the policy mechanisms, of the IEA. Section III looks at specific policy actions undertaken by the agency, particularly during the Iranian revolution and at the outbreak of the Iran-Iraq War. The economic consequences of oil sharing are examined in section IV, which simulates a world oil supply disruption affecting IEA member countries differentially. Section V analyzes import controls, focusing on coordination problems and possible OPEC pricing responses, and examines the actual record of general petroleum consumption restraints in 1980. Oil stockpiling is analyzed both as a general economic phenomenon and an object of IEA coordination in section VI, which also offers an econometric analysis of actual experience in the 1970s and 1980s. Section VII considers a number of less formal assessments of IEA policies, including self-evaluations by the IEA itself.

  15. Environmental assessment of remedial action at the Lowman Uranium Mill Tailings Site near Lowman, Idaho. Final

    SciTech Connect

    Not Available

    1991-01-01

    This document assesses the environmental impacts of stabilization on site of the contaminated materials at the Lowman uranium mill tailings site. The Lowman site is 0.5 road mile northeast of the unincorporated village of Lowman, Idaho, and 73 road miles from Boise, Idaho. The Lowman site consists of piles of radioactive sands, an ore storage area, abandoned mill buildings, and windblown/waterborne contaminated areas. A total of 29.5 acres of land are contaminated and most of this land occurs within the 35-acre designated site boundary. The proposed action is to stabilize the tailings and other contaminated materials on the site. A radon barrier would be constructed over the consolidated residual radioactive materials and various erosion control measures would be implemented to ensure the long-term stability of the disposal cell. Radioactive constituents and other hazardous constituents were not detected in the groundwater beneath the Lowman site. The groundwater beneath the disposal cell would not become contaminated during or after remedial action so the maximum concentration limits or background concentrations for the contaminants listed in the draft EPA groundwater protection standards would be met at the point of compliance. No significant impacts were identified as a result of the proposed remedial action at the Lowman site.

  16. Shemya Air Force Base, Alaska No Further Action Decision document for Hg-1. Final report

    SciTech Connect

    Not Available

    1993-03-05

    This document is being prepared to document that a No Further Action Decision (NFAD) document is appropriate for the Hg-1 site at Shemya Air Force Base (AFB), Alaska, under the Air Force Installation Restoration Program (IRP). The IRP is a Department of Defense (DOD) program established to identify and remediate hazardous waste problems on DOD property that result from past practices. The Alaska Department of Environmental Conservation (ADEC) draft document {open_quotes}No Further Action Criteria for DOD Military/FUD Sites{close_quotes} has been used as a guide in preparing this document. Air Force personnel have stated that the Hg-1 site may have been used to store mercury and PCB-contaminated material. The site was added to the IRP in 1987, and later that year a field investigation was conducted at the site. Soil samples were collected and analyzed for mercury, EP toxicity, polychlorinated biphenyls (PCBs), and dioxin. All concentrations of contaminants found in Area Hg-1 are below regulatory action levels for PCBs (40 CFR 761) and mercury (55 FR 30798) or below detection levels for dioxin/furans. Therefore, leaving these soils in place is acceptable.

  17. UMTRA Surface Project management action process document. Final report: Revision 1

    SciTech Connect

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

  18. Platform for Action: update.

    PubMed

    1995-01-01

    The Center for Women's Global Leadership (CWGL) has collaborated in the preparation of amendments and strategies designed to withstand the challenges being posed to the Platform for Action of the Fourth World Conference on Women. Specific challenges include the inappropriate use of the word "universal" to modify "human rights." This implies that some human rights are less than universal. The strategy proposed is to accept the use of the word "universal" in this context only when it affirms principles of universality contained in the Vienna Programme of Action and not where its use would restrict the rights to which women are entitled. A second concern is over the use of the word "equity" rather than "equality" when referring to gender relations. The use of these terms will be carefully monitored to insure that "equity" not be used to undermine the principle of gender equality. The third concern is the efforts of some governments to hinder the integration of women's human rights throughout the UN system. Such efforts will be opposed. Fourth, the CWGL will seek the inclusion of language which recognizes the barriers that different groups of women face when trying to secure their rights. Finally, the CWGL will propose inclusion of language recognizing and protecting sexual orientation rights. The CWGL is also going to work to translate the abstract language of the Platform for Action into political organizing potential to insure that governments will follow through on their agreements. PMID:12346441

  19. Stereoscopically Observing Manipulative Actions

    PubMed Central

    Ferri, S.; Pauwels, K.; Rizzolatti, G.; Orban, G. A.

    2016-01-01

    The purpose of this study was to investigate the contribution of stereopsis to the processing of observed manipulative actions. To this end, we first combined the factors “stimulus type” (action, static control, and dynamic control), “stereopsis” (present, absent) and “viewpoint” (frontal, lateral) into a single design. Four sites in premotor, retro-insular (2) and parietal cortex operated specifically when actions were viewed stereoscopically and frontally. A second experiment clarified that the stereo-action-specific regions were driven by actions moving out of the frontoparallel plane, an effect amplified by frontal viewing in premotor cortex. Analysis of single voxels and their discriminatory power showed that the representation of action in the stereo-action-specific areas was more accurate when stereopsis was active. Further analyses showed that the 4 stereo-action-specific sites form a closed network converging onto the premotor node, which connects to parietal and occipitotemporal regions outside the network. Several of the specific sites are known to process vestibular signals, suggesting that the network combines observed actions in peripersonal space with gravitational signals. These findings have wider implications for the function of premotor cortex and the role of stereopsis in human behavior. PMID:27252350

  20. Stereoscopically Observing Manipulative Actions.

    PubMed

    Ferri, S; Pauwels, K; Rizzolatti, G; Orban, G A

    2016-08-01

    The purpose of this study was to investigate the contribution of stereopsis to the processing of observed manipulative actions. To this end, we first combined the factors "stimulus type" (action, static control, and dynamic control), "stereopsis" (present, absent) and "viewpoint" (frontal, lateral) into a single design. Four sites in premotor, retro-insular (2) and parietal cortex operated specifically when actions were viewed stereoscopically and frontally. A second experiment clarified that the stereo-action-specific regions were driven by actions moving out of the frontoparallel plane, an effect amplified by frontal viewing in premotor cortex. Analysis of single voxels and their discriminatory power showed that the representation of action in the stereo-action-specific areas was more accurate when stereopsis was active. Further analyses showed that the 4 stereo-action-specific sites form a closed network converging onto the premotor node, which connects to parietal and occipitotemporal regions outside the network. Several of the specific sites are known to process vestibular signals, suggesting that the network combines observed actions in peripersonal space with gravitational signals. These findings have wider implications for the function of premotor cortex and the role of stereopsis in human behavior. PMID:27252350

  1. Action Learning in China

    ERIC Educational Resources Information Center

    Marquardt, Michael J.

    2015-01-01

    Action learning was introduced into China less than 20 years ago, but has rapidly become a valuable tool for organizations seeking to solve problems, develop their leaders, and become learning organizations. This article provides an historical overview of action learning in China, its cultural underpinnings, and five case studies. It concludes…

  2. Who Needs Affirmative Action.

    ERIC Educational Resources Information Center

    Ginger, Ann Fagan

    1979-01-01

    Affirmative action and reverse discrimination are discussed. Facts that were omitted from the court record on the Bakke case are examined. The need for encouraging minority students and women to continue to press for school admission and for lawyers to continue to press affirmative action suits is stressed. (MC)

  3. Affirmative Action in Israel.

    ERIC Educational Resources Information Center

    Lerner, Natan

    This paper examines issues of equality, discrimination, affirmative action, and preferential treatment in Israel. An introduction provides a broad outline of topics addressed in the paper: the status of the Jewish sector, with treatment of Jewish immigrants to serve as an example of affirmative action; the policies of the state in relation to the…

  4. Community-Action Learning

    ERIC Educational Resources Information Center

    Bell, Sarah; Mattern, Mark; Telin, Mike

    2007-01-01

    This paper describes and analyzes an undergraduate course entitled Public Interest Research in which students learn research methods by conducting research on behalf of one or more community organizations. Students' work is conceived of as community action learning, a combination of participatory action research and service learning, emphasizing…

  5. Social Action Art Therapy

    ERIC Educational Resources Information Center

    Golub, Deborah

    2005-01-01

    This paper explores intersections among art, action, and community. It describes sociopolitical aspects of the author's art therapy work with survivors of repressive regimes living in Brazil, China, and Denmark and considers ways that unique historical and social processes influenced her conceptualization and practice of social action art therapy.

  6. Training for Nonviolent Action.

    ERIC Educational Resources Information Center

    Olson, Theodore W.; Shivers, Lynne

    The theory and practice of nonviolent action training as it exists to date are reviewed in this pamphlet. A response to a renewal of interest in alternative forms of social action, the pamphlet results specifically from an international seminar of experienced organizers and trainers held at Preston Patrick, Westmorland, England, June 27 - July 2,…

  7. Renormalized action improvements

    SciTech Connect

    Zachos, C.

    1984-01-01

    Finite lattice spacing artifacts are suppressed on the renormalized actions. The renormalized action trajectories of SU(N) lattice gauge theories are considered from the standpoint of the Migdal-Kadanoff approximation. The minor renormalized trajectories which involve representations invariant under the center are discussed and quantified. 17 references.

  8. Action Research and Policy

    ERIC Educational Resources Information Center

    Foreman-Peck, Lorraine; Murray, Jane

    2008-01-01

    This article examines the relationship between action research and policy and the kind of confidence teachers, policy makers and other potential users may have in such research. Many published teacher action research accounts are criticised on the grounds that they do not fully meet the conventional standards for reporting social scientific…

  9. Affirmative Action Report, 1992.

    ERIC Educational Resources Information Center

    Nevada Univ. and Community Coll. System, Reno. Office of the Chancellor.

    All campuses and units of the University and Community College System of Nevada annually submit data to the Chancellor's Office on affirmative action. This report provides tables of affirmative action data for students enrolled during fall 1992 and professional and classified staff employed during 1992. First, student data is provided on gender…

  10. Action spectrum for photocarcinogenesis.

    PubMed

    de Gruijl, F R

    1995-01-01

    The wavelength dependence of the carcinogenicity of ultraviolet (UV) radiation needs to be known in order to assess the carcinogenic risks of various UV sources, most notably the different solar UV spectra at ground level under depleting stratospheric ozone. This wavelength dependence cannot be extracted from human data (e.g., from epidemiology); it can, however, be directly obtained from animal experiments. Precise information on the wavelength dependence, the so-called action spectrum, was not available until recently: erythemal or mutagenic action spectra have been used as substitutes. However, experimental data on skin tumors induced in hairless mice (Skh:HR1) with various polychromatic sources have been building up. Our group has found that none of the substitute action spectra yield a statistically acceptable description of our data, and we have, therefore, derived a new action spectrum, dubbed the SCUP action spectrum (SCUP stands for Skin Cancer Utrecht-Philadelphia, because the action spectrum also fits experimental data from the former Skin and Cancer Hospital in Philadelphia). The SCUP action spectrum has a maximum at 293 nm, and in the UVA region above 340 nm the relative carcinogenicity per J/m2 drops to about 10(-4) of this maximum. The effects of an ozone depletion on solar UV doses weighted with these different action spectra are compared: the erythemal and SCUP weighted dose come out as least sensitive with a 1.3% and 1.4% increase, respectively, for every 1% decrease in ozone. PMID:7597292

  11. Handbook for Ecology Action.

    ERIC Educational Resources Information Center

    Eber, Ronald

    This handbook has been compiled to aid concerned individuals and ecology groups more adequately define their goals, initiate good programs, and take effective action. It examines the ways a group of working individuals can become involved in action programs for ecological change. Part 1 deals with organization, preliminary organizing, structuring,…

  12. ACTION. Annual Report 1974.

    ERIC Educational Resources Information Center

    ACTION, Washington, DC.

    In this report are described projects and activities undertaken by ACTION's volunteer programs in 1974. After an introduction that notes accomplishments of the past year, a review of domestic operations discusses such programs as VISTA, University Year for ACTION, National Student Volunteer Program, Foster Grandparent Program, and others according…

  13. Supergravity actions with integral forms

    NASA Astrophysics Data System (ADS)

    Castellani, L.; Catenacci, R.; Grassi, P. A.

    2014-12-01

    Integral forms provide a natural and powerful tool for the construction of supergravity actions. They are generalizations of usual differential forms and are needed for a consistent theory of integration on supermanifolds. The group geometrical approach to supergravity and its variational principle are reformulated and clarified in this language. Central in our analysis is the Poincaré dual of a bosonic manifold embedded into a supermanifold. Finally, using integral forms we provide a proof of Gates' so-called "Ectoplasmic Integration Theorem", relating superfield actions to component actions.

  14. Conscious Vision in Action.

    PubMed

    Briscoe, Robert; Schwenkler, John

    2015-09-01

    It is natural to assume that the fine-grained and highly accurate spatial information present in visual experience is often used to guide our bodily actions. Yet this assumption has been challenged by proponents of the Two Visual Systems Hypothesis (TVSH), according to which visuomotor programming is the responsibility of a "zombie" processing stream whose sources of bottom-up spatial information are entirely non-conscious (Clark, 2007, 2009; Goodale & Milner, 1992, 2004a; Milner & Goodale, 1995/2006, 2008). In many formulations of TVSH, the role of conscious vision in action is limited to "recognizing objects, selecting targets for action, and determining what kinds of action, broadly speaking, to perform" (Clark, 2007, p. 570). Our aim in this study is to show that the available evidence not only fails to support this dichotomous view but actually reveals a significant role for conscious vision in motor programming, especially for actions that require deliberate attention. PMID:25845648

  15. 76 FR 20807 - Notice of Final Federal Agency Actions on the Sellwood Bridge Project, SE Tacoma Street and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ...), Department of Transportation. ACTION: Notice of limitation on claims for judicial review of actions by FHWA... subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions that are... Federal law that authorizes judicial review of a claim provides a time period of less than 180 days...

  16. Following the Action in Action Learning: Towards Ethnomethodological Studies of (Critical) Action Learning

    ERIC Educational Resources Information Center

    Fox, Steve

    2009-01-01

    Action learning is a pedagogical practice that helps participants learn by talking about their workplace action with fellow participants ("comrades in adversity") in their action learning set. This paper raises questions about the action in action learning, such as: how do members of an action learning set learn from and through each other? How do…

  17. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Appendix D. Final report

    SciTech Connect

    1988-07-01

    This appendix is an assessment of the present conditions of the inactive uranium mill site near Mexican Hat, Utah. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan. Plan is to characterize the conditions at the mill and tailings site so that the Remedial Action Contractor may complete final designs of the remedial action.

  18. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    SciTech Connect

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  19. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect

    D. Vandel

    2003-09-01

    This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

  20. Yakima Tributary Access and Habitat Program : Action Plan Final Report 2002.

    SciTech Connect

    Myra, David; Ready, Carol A.

    2003-04-01

    This report covers activities conducted by the Yakima Tributary Access and Habitat Program under Bonneville Power Administration (BPA) grant project No. 2002-025-00 for fiscal year 2002. The Yakima Tributary Access and Habitat Program (YTAHP, Program) was organized to restore salmonid passage to Yakima tributaries that historically supported salmonids and improve habitat in areas where access is restored. Specifically, this program is designed to (a) screen unscreened diversion structures to prevent fish entrainment into artificial waterways; (b) provide for fish passage at man-made barriers, such as diversion dams, culverts, siphons and bridges; and (c) provide information and assistance to landowners interested in to contributing to the improvement of water quality, water reliability and stream habitat. The YTAHP developed from a number of groups actively engaged in watershed management, and/or habitat restoration within the Yakima River Basin. These groups include the Washington State Fish and Wildlife (WDFW), Kittitas County Conservation District (KCCD), North Yakima Conservation District (NYCD), Kittitas County Water Purveyors (KCWP), and Ahtanum Irrigation District (AID). The US Bureau of Reclamation (Reclamation) and Yakama Nation (YN) both participated in the development of the objectives of YTAHP. Other entities that will be involved during permitting or project review may include the YN, the federal Natural Resources Conservation Service (NRCS), the US Fish and Wildlife Service (USFWS), the National Marine Fisheries Service (NMFS), and US Army Corps of Engineers (COE). Achievements of YTAHP with BPA Action Plan funding during FY 2002 were to: (1) Establish contracts with RC&D and YTAHP participants. (2) Determine contract mechanism for MWH engineering services. (3) Provide engineering designs and services for 11 early action projects, including inverted siphons, pump and gravity diversion screening, diversion metering, rock weirs for improved fish passage

  1. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site near Gunnison, Colorado. Final

    SciTech Connect

    Not Available

    1992-02-01

    The presence of contaminated uranium mill tailings adjacent to the city of Gunnison has been a local concern for many years. The following issues were identified during public meetings that were held by the DOE prior to distribution of an earlier version of this EA. Many of these issues will require mitigation. Groundwater contamination; in December 1989, a herd of 105 antelope were introduced in an area that includes the Landfill disposal site. There is concern that remedial action-related traffic in the area would result in antelope mortality. The proposed Tenderfoot Mountain haul road may restrict antelope access to their water supply; a second wildlife issue concerns the potential reduction in sage grouse use of breeding grounds (leks) and nesting habitat; the proposed Tenderfoot Mountain haul road would cross areas designated as wetlands by US Army Corps of Engineers (COE); the proposed disposal site is currently used for grazing by cattle six weeks a year in the spring. Additional concerns were stated in comments on a previous version of this EA. The proposed action is to consolidate and remove all contaminated materials associated with the Gunnison processing site to the Landfill disposal site six air miles east of Gunnison. All structures on the site (e.g., water tower, office buildings) were demolished in 1991. The debris is being stored on the site until it can be incorporated into the disposal cell at the disposal site. All contaminated materials would be trucked to the Landfill disposal site on a to-be-constructed haul road that crosses BLM-administered land.

  2. Action spectra again?

    PubMed

    Coohill, T P

    1991-11-01

    Action spectroscopy has a long history and is of central importance to photobiological studies. Action spectra were among the first assays to point to chlorophyll as the molecule most responsible for plant growth and to DNA as the genetic material. It is useful to construct action spectra early in the investigation of new areas of photobiological research in an attempt to determine the wavelength limits of the radiation region causing the studied response. But due to the severe absorption of ultraviolet (UV) radiation by biological samples, UV action spectra were first limited to small cells (bacteria and fungi). Advances in techniques (e.g. single cell culture) and analysis allowed accurate action spectra to be reported even for mammalian cells. But precise analytical action spectra are often difficult to obtain when large, pigmented, or groups of cells are investigated. Here some action spectra are limited in interpretation and merely supply a wavelength vs effect curve. When polychromatic sources are employed, the interpretation of action spectra is even more complex and formidable. But such polychromatic action spectra can be more directly related to ambient responses. Since precise action spectra usually require the completion of a relatively large number of careful experiments using somewhat sophisticated equipment over a range of at least six wavelengths, they are often not pursued. But they remain central to the elucidation of the effect being studied. The worldwide community has agreed that stratospheric ozone is depleting, with the possibility of a consequent rise in the amount of UV-B (290-320 nm) reaching the earth's surface. It is therefore essential that new action spectra be completed for UV-B effects on a large variety of responses of human, animal, and aquatic plant systems. Combining these action spectra with the known amounts of UV-B reaching the biosphere can give rise to solar UV effectiveness spectra that, in turn, can give rise to estimates

  3. Testing fractional action cosmology

    NASA Astrophysics Data System (ADS)

    Shchigolev, V. K.

    2016-08-01

    The present work deals with a combined test of the so-called Fractional Action Cosmology (FAC) on the example of a specific model obtained by the author earlier. In this model, the effective cosmological term is proportional to the Hubble parameter squared through the so-called kinematic induction. The reason of studying this cosmological model could be explained by its ability to describe two periods of accelerated expansion, that is in agreement with the recent observations and the cosmological inflation paradigm. First of all, we put our model through the theoretical tests, which gives a general conception of the influence of the model parameters on its behavior. Then, we obtain some restrictions on the principal parameters of the model, including the fractional index, by means of the observational data. Finally, the cosmography parameters and the observational data compared to the theoretical predictions are presented both analytically and graphically.

  4. The development of action planning in a joint action context.

    PubMed

    Paulus, Markus

    2016-07-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus. Their task was to hand the experimenter a tool with which she could activate 1 of 2 different effects on the apparatus. The elicitation of each effect required participants to grasp and insert the tool in a particular orientation. We assessed whether participants planned their grasping and reaching action in such a way that it enabled the partner to efficiently handle the tool, that is, anticipating the final end state of the joint activity. We found that 3-year-old children did not adjust their behavior to accommodate the other's action and that they did not increase their performance over multiple trials. Five- and 7-year-old children initially showed a tendency to plan their action in an egocentric manner (i.e., showed a form of egocentrism), but improved their joint action performance over time. Adult participants demonstrated joint action planning from the beginning. Interestingly, 3- and 5-year-old children were able to plan their grasp efficiently when acting alone on the apparatus. Yet, having first-hand experience with the task before acting with a partner did not facilitate performance in the joint action task for younger children. Overall, the study informs current approaches on the psychological basis and ontogenetic origins of joint action in childhood. (PsycINFO Database Record PMID:27337512

  5. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final

    SciTech Connect

    Not Available

    1994-03-01

    This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

  6. Conscious Control over Action

    PubMed Central

    Shepherd, Joshua

    2015-01-01

    The extensive involvement of nonconscious processes in human behaviour has led some to suggest that consciousness is much less important for the control of action than we might think. In this article I push against this trend, developing an understanding of conscious control that is sensitive to our best models of overt (that is, bodily) action control. Further, I assess the cogency of various zombie challenges—challenges that seek to demote the importance of conscious control for human agency. I argue that though nonconscious contributions to action control are evidently robust, these challenges are overblown. PMID:26113753

  7. Corrective Action Glossary

    SciTech Connect

    Not Available

    1992-07-01

    The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations or remediations are also included.

  8. Comment and response document for the final remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Revision 2

    SciTech Connect

    1996-05-01

    This document for the final remedial action plan and site design has been prepared for US Department of Energy Environmental Restoration Division as part of the Uranium Mill Tailings Remedial Action plan. Comments and responses are included for the site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado.

  9. 75 FR 19670 - Notice of Final Federal Agency Actions on a Proposed New Road Connecting I-65 and U.S. 31W in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... Federal Highway Administration Notice of Final Federal Agency Actions on a Proposed New Road Connecting I... meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project: a new connector road... following highway project in the State of Kentucky: The project involves the construction of a new...

  10. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report. Revised final report

    SciTech Connect

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose. First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.

  11. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Remedial action selection report, Attachment 2, Geology report: Preliminary final

    SciTech Connect

    Not Available

    1993-08-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this document and the rest of the RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the State of Colorado.

  12. Rrecord of Decision (EPA Region 1): Groveland Wells, Operable Unit 1, Groveland, MA. (Second remedial action), September 1991. Final report

    SciTech Connect

    Not Available

    1991-09-30

    The 850-acre Groveland Wells site is a municipal well field in Groveland, Massachusetts. The site is underlain by a surfical unconsolidated aquifer, which is a source of ground water for the well field, and a deeper bedrock aquifer. In 1979, elevated levels of TCE were discovered in the onsite water supply wells, resulting in the closure of the wells, development of alternate water supplies, and investigations by EPA. EPA investigations identifed three likely sources of contamination: the A.W. Chesterton Company, currently being remediated under RCRA corrective action and closure activities; the Haverhill Municipal Landfill, which has been addressed as a separate CERCLA action; and the Valley Manufactured Products Company (Valley), a screw machine products manufacturer and finisher. The ROD addresses management of migration of contamination in the surfical and bedrock aquifers extending from the valley site, as a final remedy. The primary contaminants of concern affecting the ground water are VOCs including benzene, PCE, TCE, and toluene; and metals including arsenic, chromium, and lead. The selected remedial action for the site is included.

  13. Immunization Action Coalition

    MedlinePlus

    ... IAC | Contact | A-Z Index | Donate | Shop | SUBSCRIBE Immunization Action Coalition Handouts for Patients & Staff A-Z ... Index Supplies Checklist Administering Vaccines Temperature Logs Adult Vaccination Topics of Interest Documenting Vaccination Translations Parent Handouts ...

  14. Delving into Egocentric Actions

    PubMed Central

    Li, Yin; Ye, Zhefan; Rehg, James M.

    2016-01-01

    We address the challenging problem of recognizing the camera wearer's actions from videos captured by an egocentric camera. Egocentric videos encode a rich set of signals regarding the camera wearer, including head movement, hand pose and gaze information. We propose to utilize these mid-level egocentric cues for egocentric action recognition. We present a novel set of egocentric features and show how they can be combined with motion and object features. The result is a compact representation with superior performance. In addition, we provide the first systematic evaluation of motion, object and egocentric cues in egocentric action recognition. Our benchmark leads to several surprising findings. These findings uncover the best practices for egocentric actions, with a significant performance boost over all previous state-of-the-art methods on three publicly available datasets. PMID:26973427

  15. Caregiver Action Network

    MedlinePlus

    ... main content Caregiver Action Network Toggle navigation Toolbox Forum Volunteers Donate About Us Join National Family Caregivers ... for caring for a loved one Family Caregiver Forum Share and talk with other caregivers Rare Disease ...

  16. Postpartum Depression Action Plan

    MedlinePlus

    MENU Return to Web version Postpartum Depression | Postpartum Depression Action Plan Patient __________________________ Physician/NP/PA __________________ Clinic ____________________________ Phone Number ____________________ Choose one area and add other areas as you begin to ...

  17. Affirmative Action's Contradictory Consequences.

    ERIC Educational Resources Information Center

    Heilman, Madeline E.

    1996-01-01

    Addresses affirmative action's success at creating a more equal workplace. Explores some potential psychological costs of this policy--costs that paradoxically may undermine its objectives--and their implications for achieving the goal of workplace equality. (GR)

  18. Commitment to action. Population Action International.

    PubMed

    Squires, S

    1994-01-01

    The national chair of Population Action International (formerly the Population Crisis Committee), Robin Chandler Duke, is a crusader for women's reproductive rights. She was in Bangladesh in 1971 during its civil war. Soldiers would rape young Muslim women, and their families would reject them when they became pregnant. The head of the exiled government agreed to let physicians from IPPF perform abortions on these women, which allowed families to take them back. Opposition to the abortions arose, however. This experience in Bangladesh sparked Ms. Duke's interest in population control. Her years as the wife of a US diplomat granted her access to powerful people worldwide. Her predecessor, retired US Army General Bill Draper, called Ms. Duke from his death bed in 1974 to ask her to be national chair of PAI. She served as a delegate in various international meetings, e.g., the 1980 UNESCO meetings in Belgrade. Spain and Luxembourg honored her for her work of campaigning for women's reproductive rights. She believes that rapid population growth is the most significant problem in the world today. It exacerbates poverty, environmental destruction, and political instability. She believes that universal availability of high quality, voluntary family planning services, including safe abortion, is needed to save humanity from the vicious cycle. Since family planning, sex education, and abortion are the most personal and sensitive parts of people's lives, Population Action frames family planning in the context of basic health care. AIDS complicates the issue, because contraception is no longer limited to birth control. Even though the organization realizes that sexual abstinence is the best way to avoid AIDS, it tries to educate female teenagers not to let boys coerce them to have sex. If they do, have sex Population Action advocates condom use. Ms. Duke cites the family planning successes of Indonesia, Zimbabwe, and Thailand. PMID:12319083

  19. Setting priorities for action plans at Los Alamos National Laboratory. Final report

    SciTech Connect

    Miller, A.C.

    1992-09-30

    This report summarizes work done by Applied Decision Analysis (ADA) for Los Alamos National Laboratory (LANL) under Subcontract Number 9-XQ2-Y3837-1 with the University of California. The purpose of this work was to develop a method of setting priorities for environmental, safety, and health (ES&H) deficiencies at Los Alamos. The deficiencies were identified by a DOE Tiger Team that visited LANL in the fall of 1991, and by self assessments done by the Laboratory. ADA did the work described here between October 1991 and the end of September 1992. The ADA staff working on this project became part of a Risk Management Team in the Laboratory`s Integration and Coordination Office (ICO). During the project, the Risk Management Team produced a variety of documents describing aspects of the action-plan prioritization system. Some of those documents are attached to this report. Rather than attempt to duplicate their contents, this report provides a guide to those documents, and references them whenever appropriate.

  20. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    SciTech Connect

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

  1. Galileons from Lovelock actions

    SciTech Connect

    Van Acoleyen, Karel; Van Doorsselaere, Jos

    2011-04-15

    We demonstrate how, for an arbitrary number of dimensions, the Galileon actions and their covariant generalizations can be obtained through a standard Kaluza-Klein compactification of higher-dimensional Lovelock gravity. In this setup, the dilaton takes on the role of the Galileon. In addition, such compactifications uncover other more general Galilean actions, producing purely second-order equations in the weak-field limit, now both for the Galileon and the metric perturbations.

  2. Action Learning as Invigoration

    ERIC Educational Resources Information Center

    Chivers, Terence S.

    2011-01-01

    The present account of action learning describes its adoption for pragmatic reasons by the University of the Third Age (U3A). The reason for the existence of this movement is the education of retired people. The account seeks to explain why the action learning method spread from one local U3A to another and across it to other local U3As. The case…

  3. Cardiac action potential imaging

    NASA Astrophysics Data System (ADS)

    Tian, Qinghai; Lipp, Peter; Kaestner, Lars

    2013-06-01

    Action potentials in cardiac myocytes have durations in the order of magnitude of 100 milliseconds. In biomedical investigations the documentation of the occurrence of action potentials is often not sufficient, but a recording of the shape of an action potential allows a functional estimation of several molecular players. Therefore a temporal resolution of around 500 images per second is compulsory. In the past such measurements have been performed with photometric approaches limiting the measurement to one cell at a time. In contrast, imaging allows reading out several cells at a time with additional spatial information. Recent developments in camera technologies allow the acquisition with the required speed and sensitivity. We performed action potential imaging on isolated adult cardiomyocytes of guinea pigs utilizing the fluorescent membrane potential sensor di-8-ANEPPS and latest electron-multiplication CCD as well as scientific CMOS cameras of several manufacturers. Furthermore, we characterized the signal to noise ratio of action potential signals of varying sets of cameras, dye concentrations and objective lenses. We ensured that di-8-ANEPPS itself did not alter action potentials by avoiding concentrations above 5 μM. Based on these results we can conclude that imaging is a reliable method to read out action potentials. Compared to conventional current-clamp experiments, this optical approach allows a much higher throughput and due to its contact free concept leaving the cell to a much higher degree undisturbed. Action potential imaging based on isolated adult cardiomyocytes can be utilized in pharmacological cardiac safety screens bearing numerous advantages over approaches based on heterologous expression of hERG channels in cell lines.

  4. Superfund record of decision (EPA Region 1): Town Garage Radio Beacon, Londonderry, NH. (First remedial action), September 1992. Final report

    SciTech Connect

    Not Available

    1992-09-30

    The Town Garage Radio Beacon, NH, site includes the Holton Circle residential development of 23 homes, a town garage area, and an undeveloped hillslope and wetlands area in Londonderry, New Hampshire. From 1940 to 1968, the area was owned by the Department of Defense (DOD), who reportedly used it as a radio beacon facility from 1940 to 1947. The ROD provides a final remedy for the contaminated onsite ground water. No further remedial actions are anticipated for the site. The primary contaminants affecting the ground water are VOCs; and metals, including chromium.

  5. [Addictions and action systems].

    PubMed

    Loonis, E; Apter, M J

    2000-01-01

    Generalizing from some previous analyses of addiction, and introducing the concept of an action system which governs all actions which are focussed on what Brown (1988) calls "hedonic management", we argue that addictions of every kind involve an action system that displays high salience, low variety and low vicariance. Addictions also involve what Apter (1982) calls the "paratelic state". A study was carried out comparing 31 drug addicts with 29 control subjects in terms of action system variables. To measure these variables, we constructed a new instrument, the Activity-System Drawing Test, and also used the Telic Dominance Scale to measure frequency of paratelic states. Dysphoria was measured by means of the BATE (anxiety), IDA-13 (depression), SEI (self-esteem), and TAS-20 (alexithymia) instruments. Strongly significant differences were found between groups for both action system variables and dysphoria, and there were also strong correlations between both groups of variables. This supports the idea that addictions emerge from systemic properties of the action system. PMID:10858918

  6. 47 CFR 1.425 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission action. 1.425 Section 1.425... Proceedings § 1.425 Commission action. The Commission will consider all relevant comments and material of record before taking final action in a rulemaking proceeding and will issue a decision incorporating...

  7. 45 CFR 1225.10 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Corrective action. 1225.10 Section 1225.10 Public... Corrective action. When it has been determined by Final Agency Decision that the aggrieved party has been subjected to illegal discrimination, the following corrective actions may be taken: (a) Selection as...

  8. 32 CFR 536.62 - Action memorandums.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Action memorandums. 536.62 Section 536.62... AGAINST THE UNITED STATES Investigation and Processing of Claims § 536.62 Action memorandums. (a) When... claims on which suit is filed before final action, see § 536.66. A settlement authority may deny or...

  9. Comment and response document on the final remedial action plan and site design for stabilization of the inactive Uranium Mill Tailings Site at Lakeview, Oregon

    SciTech Connect

    Not Available

    1991-10-01

    This report contains comments provided by the Oregon Department of Energy and responses to these comments on the final remedial action plan for the inactive uranium mill tailings site at Lakeview, Oregon.

  10. Classifying Facial Actions

    PubMed Central

    Donato, Gianluca; Bartlett, Marian Stewart; Hager, Joseph C.; Ekman, Paul; Sejnowski, Terrence J.

    2010-01-01

    The Facial Action Coding System (FACS) [23] is an objective method for quantifying facial movement in terms of component actions. This system is widely used in behavioral investigations of emotion, cognitive processes, and social interaction. The coding is presently performed by highly trained human experts. This paper explores and compares techniques for automatically recognizing facial actions in sequences of images. These techniques include analysis of facial motion through estimation of optical flow; holistic spatial analysis, such as principal component analysis, independent component analysis, local feature analysis, and linear discriminant analysis; and methods based on the outputs of local filters, such as Gabor wavelet representations and local principal components. Performance of these systems is compared to naive and expert human subjects. Best performances were obtained using the Gabor wavelet representation and the independent component representation, both of which achieved 96 percent accuracy for classifying 12 facial actions of the upper and lower face. The results provide converging evidence for the importance of using local filters, high spatial frequencies, and statistical independence for classifying facial actions. PMID:21188284

  11. ES H action plan

    SciTech Connect

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  12. 45 CFR 1606.7 - Corrective action, informal conference, review of written materials, and final decision.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... final decision need not engage in a detailed analysis of the failure to resolve the substantial... presented in any written materials. The draft final decision need not engage in a detailed analysis of all... written materials, and final decision. 1606.7 Section 1606.7 Public Welfare Regulations Relating to...

  13. 45 CFR 1606.7 - Corrective action, informal conference, review of written materials, and final decision.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... final decision need not engage in a detailed analysis of the failure to resolve the substantial... presented in any written materials. The draft final decision need not engage in a detailed analysis of all... written materials, and final decision. 1606.7 Section 1606.7 Public Welfare Regulations Relating to...

  14. Mitigation Action Plan

    SciTech Connect

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  15. Action languages: Dimensions, effects

    NASA Technical Reports Server (NTRS)

    Hayes, Daniel G.; Streeter, Gordon

    1989-01-01

    Dimensions of action languages are discussed for communication between humans and machines, and the message handling capabilities of object oriented programming systems are examined. Design of action languages is seen to be very contextual. Economical and effective design will depend on features of situations, the tasks intended to be accomplished, and the nature of the devices themselves. Current object oriented systems turn out to have fairly simple and straightforward message handling facilities, which in themselves do little to buffer action or even in some cases to handle competing messages. Even so, it is possible to program a certain amount of discretion about how they react to messages. Such thoughtfulness and perhaps relative autonomy of program modules seems prerequisite to future systems to handle complex interactions in changing situations.

  16. Learning to take actions

    SciTech Connect

    Khardon, R.

    1996-12-31

    We formalize a model for supervised learning of action strategies in dynamic stochastic domains, and show that pac-learning results on Occam algorithms hold in this model as well. We then identify a particularly useful bias for action strategies based on production rule systems. We show that a subset of production rule systems, including rules in predicate calculus style, small hidden state, and unobserved support predicates, is properly learnable. The bias we introduce enables the learning algorithm to invent the recursive support predicates which are used in the action strategy, and to reconstruct the internal state of the strategy. It is also shown that hierarchical strategies are learnable if a helpful teacher is available, but that otherwise the problem is computationally hard.

  17. Improving Learning and Teaching through Action Learning and Action Research.

    ERIC Educational Resources Information Center

    Zuber-Skeriit, Ortrun

    1993-01-01

    A theoretical framework for action learning and action research is presented, as a basis for better understanding college instruction and learning. Action research is viewed as a philosophy, theory of learning, research methodology, and teaching technique. It is argued that action research both increases knowledge and improves teaching.…

  18. 78 FR 77477 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Action on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... Register on September 23, 2011, FR Doc. 2011-24504, page 59125, and in the FHWA/FTA ROD issued on December... January 5, 2012, FR Doc. 2011-33784, pages 531- 532, by the FHWA and FTA regarding environmental actions... the Interstate 5 Bridge across the Columbia River AGENCY: Coast Guard, DHS. ACTION: Notice...

  19. 78 FR 54947 - Notice of Final Federal Agency Actions on Proposed US 1 Improvements-Rockingham, Richmond County, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... County, NC ] from Sandhill Road (SR 1971) to Marston Road (SR 1001). Those actions grant licenses... proposed action will improve 19 miles of US 1 from Sandhill Road (SR 1971) south of Rockingham to Marston... on new location, and widens about five miles of existing US 1. From Sandhill Road (SR 1971) to...

  20. 78 FR 23630 - Notice of Final Federal Agency Actions on State Highway 99 (Segment C) in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    .... 1251- 1342; Land and Water Conservation Fund (LWCF), 16 U.S.C. 4601-4604. 8. Executive Orders: E.O... Texas AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for...) to SH 288 in Fort Bend and Brazoria Counties, Texas. Those actions grant licenses, permits,...

  1. 77 FR 34456 - Notice of Final Federal Agency Actions on the Newberg Dundee Bypass Project Project: Yamhill and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ...: Notice of Limitations on Claims for Judicial Review of Actions by FHWA. SUMMARY: This notice announces... seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before December 10, 2012. If the Federal law that authorizes judicial review of...

  2. 75 FR 53735 - Notice of Final Federal Agency Actions on East Lake Sammamish Master Plan Trail in King County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies. SUMMARY: This notice... seeking judicial review of the Federal agency actions on the transportation project will be barred unless the claim is filed on or before February 28, 2011. If the Federal law that authorizes judicial...

  3. Mobilizing grassroots action.

    PubMed

    1995-01-01

    Zero Population Growth, Inc. (ZPG), was very busy in 1994 spreading its message about the dangers of rapid population growth. ZPG's Field and Outreach Program is vital to the success of the organization. Organization activists staffed tables at more than 170 events in 1994, while the Speakers Network gave 159 presentations. ZPG was represented on Earth Day, World Population Day, during World Population Awareness Week, and at Cairo town meetings, as well as at the HORDE rock festival and the 25th anniversary of the Woodstock Music Festival. Campus contacts developed at these latter two concerts formed the basic for ZPG's Campus Outreach Project. In 1994, the Field department focused upon the International Conference on Population and Development to be held in Cairo, Egypt. ZPG encouraged people to get involved in conference preparations by helping to plan and implement town meetings in eleven major US cities. Members were contacted by ZPG via flyers and phone calls about meetings in their areas. ZPG activists and chapters then provided leadership for many of the meetings which drew thousands of participants and were widely praised by national leaders. Throughout 1994, ZPG's 21 chapters provided members with a vehicle for collective action and a source of information about the population conference, population growth, and wasteful consumption. Chapter activists also helped secure the signatures of thousands of people on Population Priority Petitions; the final list of names was delivered to US Vice President Al Gore in November. PMID:12289955

  4. Final Environmental Assessment of remedial action at the Falls City uranium mill tailings site, Falls City, Texas

    SciTech Connect

    Not Available

    1991-12-01

    This environmental assessment (EA) is prepared pursuant to the National Environmental Policy Act (NEPA), which requires Federal agencies to assess the impacts that their actions may have on the environment. This EA examines the short- and long-term effects of the DOE`s proposed remedial action for the Falls City tailings site. The no action alternative is also examined. The DOE will use the information and analyses presented here to determine whether the proposed action would have a significant impact on the environment. If the impacts are determined to be significant, an EIS will be prepared. If the impacts are not judged to be significant, the DOE will issue an official ``Finding of No Significant Impact`` and implement the proposed action.

  5. Jump into Action

    ERIC Educational Resources Information Center

    Ball, Stephen; Cohen, Ann; Meyer, Margaret

    2012-01-01

    Jump Into Action (JIA) is a school-based team-taught program to help fifth-grade students make healthy food choices and be more active. The JIA team (physical education teacher, classroom teacher, school nurse, and parent) work together to provide a supportive environment as students set goals to improve food choices and increase activity.…

  6. Conclusions and Federal actions

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Findings regarding fluorocarbon production, the roles of ozone and fluorocarbons in atmospheric chemistry, the depletion of stratospheric ozone by fluorocarbons, and various effects of this depletion are outlined. Research into these areas is described and recommendations are given for governmental action to reduce the release of fluorocarbons to the environment.

  7. The Constitution in Action

    ERIC Educational Resources Information Center

    Potter, Lee Ann

    2007-01-01

    In this article, the author describes the experiences middle school students on a field trip to the new Constitution in Action Learning Lab in the Boeing Learning Center at the National Archives can expect. There, middle school students take on the roles of archivists and researchers collecting and analyzing primary sources from the holdings of…

  8. Cognitive framing in action.

    PubMed

    Huhn, John M; Potts, Cory Adam; Rosenbaum, David A

    2016-06-01

    Cognitive framing effects have been widely reported in higher-level decision-making and have been ascribed to rules of thumb for quick thinking. No such demonstrations have been reported for physical action, as far as we know, but they would be expected if cognition for physical action is fundamentally similar to cognition for higher-level decision-making. To test for such effects, we asked participants to reach for a horizontally-oriented pipe to move it from one height to another while turning the pipe 180° to bring one end (the "business end") to a target on the left or right. From a physical perspective, participants could have always rotated the pipe in the same angular direction no matter which end was the business end; a given participant could have always turned the pipe clockwise or counter-clockwise. Instead, our participants turned the business end counter-clockwise for left targets and clockwise for right targets. Thus, the way the identical physical task was framed altered the way it was performed. This finding is consistent with the hypothesis that cognition for physical action is fundamentally similar to cognition for higher-level decision-making. A tantalizing possibility is that higher-level decision heuristics have roots in the control of physical action, a hypothesis that accords with embodied views of cognition. PMID:26970853

  9. Nutrition Action Pack.

    ERIC Educational Resources Information Center

    Sockut, Joanne; Stumpe, Stephanie

    One of five McDonald's Action Packs, these instructional materials integrate elementary school-level nutrition education into other disciplines--biology, sociology, physiology, mathematics, and art. Contents include four units consisting of twelve activities. Unit 1, Why You Need Food, is a self-examination of what is needed for growth, health,…

  10. SYRACUSE ACTION FOR YOUTH.

    ERIC Educational Resources Information Center

    ADDINGTON, HAROLD E.; AND OTHERS

    A PROPOSAL WAS MADE TO PREVENT AND CONTROL JUVENILE DELINQUENCY BY OPENING OPPORTUNITIES AND DEVELOPING COMPETENCE AMONG DISADVANTAGED YOUTH. THE TOTAL COMMUNITY WAS MOBILIZED TO DEVELOP A PROGRAM TO ATTACK THE PROBLEM AT ALL LEVELS THEY WORKED FOR 18 MONTHS TO PLAN A SERIES OF CREATIVE ACTION PROGRAMS IN EDUCATION, EMPLOYMENT, AND COMMUNITY…

  11. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    In order to develop an affirmative action plan at Triton College, the college President appointed a committee made up of nine representatives from the various college constituencies, the majority of which were women and minorities, to determine the objectives to be achieved and how to implement them, and to establish appropriate review procedures.…

  12. Justifying Action Research

    ERIC Educational Resources Information Center

    Helskog, Guro Hansen

    2014-01-01

    In this paper I use a general philosophy of science perspective in looking at the problem of justifying action research. First I try to clarify the concept of justification, by contrasting it with the concept of validity, which seems to be used almost as a synonym in some parts of the literature. I discuss the need for taking a stand in relation…

  13. Hope for Environmental Action

    ERIC Educational Resources Information Center

    Fleischer, Barbara J.; DeMoor, Emily

    2015-01-01

    Environmental consciousness-raising programs tend to emphasize the magnitude of imminent ecological disasters, if humans continue on their current trajectory. While these environmental literacy programs also call for action to avoid cataclysmic ecological changes, psychological research on "learned helplessness" suggests that information…

  14. Community Action Curriculum Compendium.

    ERIC Educational Resources Information Center

    Duncan, Karen

    This compendium contains descriptions of 59 community action projects that receive academic credit from 48 colleges and universities. Brief descriptions are given of the diverse institutions offering such field work for credit, including information on enrollment and type (i.e., public, private, etc.). Although the characteristics of the programs…

  15. School Reform in Action.

    ERIC Educational Resources Information Center

    Miller, A. Christine

    This study describes and analyzes the impact on student learning and the learning environment of 55 schools in Broward, Palm Beach, and Miami-Dade school districts as they implemented the schoolwide action-research framework for school improvement. Interviews, observations, document review during site visits, school framework reports, surveys,…

  16. Action Learning Issues.

    ERIC Educational Resources Information Center

    1998

    This document contains four papers from a symposium on adult learning issues and human resource development (HRD). "Creating a Systemic Framework for the Transfer of Learning from an Action Learning Experience" (Suzanne D. Butterfield, Kitty Gold, Verna J. Willis) discusses a study of the organizational elements that affect learning and transfer…

  17. Early Childhood Action Tips.

    ERIC Educational Resources Information Center

    O'Donnell, Nina Sazer

    In response to requests for information from people and organizations all over the United States on how to contribute to the healthy development of young children, the Families and Work Institute has gathered concrete suggestions from leaders in diverse fields into this booklet of action tips. This effort was undertaken to support the "I Am Your…

  18. Quick action clamp

    NASA Technical Reports Server (NTRS)

    Calco, Frank S. (Inventor)

    1991-01-01

    A quick release toggle clamp that utilizes a spring that requires a deliberate positive action for disengagement is presented. The clamp has a sliding bolt that provides a latching mechanism. The bolt is moved by a handle that tends to remain in an engaged position while under tension.

  19. Court Action for Migrants.

    ERIC Educational Resources Information Center

    Ewald, Thomas R.

    Aiding attorneys who represent migrant farmworkers and their families when affirmative civil action is required, this book helps to raise the level of migrants' legal protection to a minimum standard of adequacy. The text is based on the Federal Rules of Civil Procedure, a national set of rules. The book is divided into 3 sections: the…

  20. From Awareness to Action

    ERIC Educational Resources Information Center

    Micklos, John, Jr.

    2012-01-01

    What inspires young people to become activists? Events such as wars or regime changes obviously raise high emotions. But some choose to get involved because they saw a need and felt compelled to take action. Young Americans have a long track record as activists. Among other things, they played a key role in the civil rights movement of the 1950s…

  1. ACTION. Annual Report 1978.

    ERIC Educational Resources Information Center

    ACTION, Washington, DC.

    In this report are described projects and activities undertaken by ACTION's volunteer programs in 1978. The introduction notes a continued growth in programs and comments on new developments. Older American Volunteer Programs are discussed in the next section, specifically the Retired Senior Volunteer Program, Foster Grandparent Program, and…

  2. The Shape of Action

    ERIC Educational Resources Information Center

    Hard, Bridgette Martin; Recchia, Gabriel; Tversky, Barbara

    2011-01-01

    How do people understand the everyday, yet intricate, behaviors that unfold around them? In the present research, we explored this by presenting viewers with self-paced slideshows of everyday activities and recording looking times, subjective segmentation (breakpoints) into action units, and slide-to-slide physical change. A detailed comparison of…

  3. Affirmative Action for Men?

    ERIC Educational Resources Information Center

    Malveaux, Julianne

    2005-01-01

    If colleges are willing to consider "social engineering" and affirmative action to ensure the inclusion of White men, are they willing to do so for African Americans and other people of color? Will the Center for Individual Rights ride to the rescue of the White women who may be unfairly nudged out of positions for which they are "qualified" in…

  4. Instructional Rounds in Action

    ERIC Educational Resources Information Center

    Roberts, John E.

    2012-01-01

    "Instructional Rounds in Action" is an invaluable guide for those involved in implementing instructional rounds as the foundation and framework for systemic improvement in schools. Over the past few years, districts across the United States, Canada, and Australia have begun implementing "instructional rounds," a set of ideas and practices for…

  5. Action for Children's Television.

    ERIC Educational Resources Information Center

    Ranly, Donald P.

    The origins, development, and effectiveness of Action for Children's Television (ACT) are examined in this pamphlet. The strategies used by ACT to obtain change at the congressional level and within television stations and networks include the following: a "tuneout" day when people are urged to turn off their television sets, a boycott of certain…

  6. From Intuition to Action

    ERIC Educational Resources Information Center

    Principal, 2012

    2012-01-01

    The vast majority of principals intuitively believe that the arts belong in schools and in every child's life. Now is the time to take action on your intuition--and become an instructional leader for the arts, just as you are for every core subject. Arts-engaged principals share strategies for becoming instructional leaders for the arts.

  7. Action Research in Practice

    ERIC Educational Resources Information Center

    Piggot-Irvine, Eileen

    2009-01-01

    Action research places a powerful tool for school improvement in the hands of teachers. By highlighting the outcomes that are possible and presenting clear steps in the research process, this book is one to encourage anyone who is seeking to implement evidence-based school improvement. Eileen Piggot-Irvine uses her Problem Resolving Action…

  8. Conjugate flow action functionals

    SciTech Connect

    Venturi, Daniele

    2013-11-15

    We present a new general framework to construct an action functional for a non-potential field theory. The key idea relies on representing the governing equations relative to a diffeomorphic flow of curvilinear coordinates which is assumed to be functionally dependent on the solution field. Such flow, which will be called the conjugate flow, evolves in space and time similarly to a physical fluid flow of classical mechanics and it can be selected in order to symmetrize the Gâteaux derivative of the field equations with respect to suitable local bilinear forms. This is equivalent to requiring that the governing equations of the field theory can be derived from a principle of stationary action on a Lie group manifold. By using a general operator framework, we obtain the determining equations of such manifold and the corresponding conjugate flow action functional. In particular, we study scalar and vector field theories governed by second-order nonlinear partial differential equations. The identification of transformation groups leaving the conjugate flow action functional invariant could lead to the discovery of new conservation laws in fluid dynamics and other disciplines.

  9. College Comedy and Action

    ERIC Educational Resources Information Center

    Moore, Rosanna

    1977-01-01

    A few materials such as yarn and scraps of paper and cloth can provide the media for recording limitless ideas from the imaginations of students. With a little encouragement and a few suggestions of actions, emotions, exaggerations and activities students will produce a vast array of amusing characters. (Author)

  10. Promoting Environmental Action.

    ERIC Educational Resources Information Center

    Bowyer, John

    1994-01-01

    Outlines a lesson on the extinction process allowing students to better understand why and how species become endangered before they attempt to take action on this problem. Provides background information and describes several suggested methodologies, evaluation and enrichment ideas, six resources, and two references. (LZ)

  11. Literacy Education Action.

    ERIC Educational Resources Information Center

    Clymer, Carol

    The Literacy Education Action (LEA) program was established in the fall of 1985 under the initiative of the president of the El Paso Community College (Texas). During 1985 and 1986, LEA concentrated on developing its own literacy tutoring program, including recruiting and training volunteers and community members with reading skills below the…

  12. Angels in Action

    ERIC Educational Resources Information Center

    Stylianou, Xanthippi Cynthia

    2009-01-01

    In this article, the author discusses the importance of the placement of action lines to show the direction of movement. The author shows some visuals of angels and discusses in details the texture of the wings, the hair and the clothing.

  13. Economics Action Pack.

    ERIC Educational Resources Information Center

    McDonald's Corp., Oak Brook, IL.

    One of five McDonald's Action Packs, this learning package introduces intermediate grade students to basic economic concepts. The fourteen activities include the topics of consumption (4 activities), production (5), the market system (3), a pretest, and a posttest. Specific titles under consumption include The Wonderful Treasure Tree (introduction…

  14. Sustainability as Moral Action

    ERIC Educational Resources Information Center

    Dunn, Merrily S.; Hart-Steffes, Jeanne S.

    2012-01-01

    When one considers sustainability as a moral action, there are equally complex realities at hand--climate change, resource depletion, water and land rights. One author describes this broad sense of sustainability as "the connection of specific social and environmental problems to the functioning of human and ecological systems" (Jenkins, 2011).…

  15. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Education, Oklahoma City.

    As mandated by law, this 1983 revision describes the Oklahoma State Department of Education's Affirmative Action Plan and analyzes the employment patterns of the department's work force for that year in light of equal employment opportunity goals. Following a brief policy statement, the development, dissemination, and implementation of the plan…

  16. Conjugate flow action functionals

    NASA Astrophysics Data System (ADS)

    Venturi, Daniele

    2013-11-01

    We present a new general framework to construct an action functional for a non-potential field theory. The key idea relies on representing the governing equations relative to a diffeomorphic flow of curvilinear coordinates which is assumed to be functionally dependent on the solution field. Such flow, which will be called the conjugate flow, evolves in space and time similarly to a physical fluid flow of classical mechanics and it can be selected in order to symmetrize the Gâteaux derivative of the field equations with respect to suitable local bilinear forms. This is equivalent to requiring that the governing equations of the field theory can be derived from a principle of stationary action on a Lie group manifold. By using a general operator framework, we obtain the determining equations of such manifold and the corresponding conjugate flow action functional. In particular, we study scalar and vector field theories governed by second-order nonlinear partial differential equations. The identification of transformation groups leaving the conjugate flow action functional invariant could lead to the discovery of new conservation laws in fluid dynamics and other disciplines.

  17. 76 FR 16653 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... were taken, are described in the Final Environmental Assessment (FEA) for the project, approved via... FHWA project records. The FEA, FONSI, and other project records are available by contacting Caltrans...

  18. 42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for... Withdrawal of Approval of an Accreditation Body § 8.34 Court review of final administrative...

  19. 42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for... Withdrawal of Approval of an Accreditation Body § 8.34 Court review of final administrative...

  20. Human action recognition by extracting motion trajectories

    NASA Astrophysics Data System (ADS)

    Fu, Yuwen; Yang, Shangpeng

    2015-07-01

    This paper proposes a novel human action recognition framework named Hidden Markov Model (HMM) based Hybrid Event Probability Sequence (HEPS), which can recognize unlabeled actions from videos. First, motion trajectories are effectively extracted using the centers of moving objects. Secondly, the HEPS is constructed using the trajectories and represents different human actions. Finally, the improved Particle Swarm Optimization (PSO) with inertia weight is introduced to recognize human actions using HMM. The proposed methods are evaluated on UCF Human Action Dataset and achieve 76.67% accurate rate. The comparative experiments results demonstrate that the HMM got superior results with HEPS and PSO.

  1. Holography in action

    SciTech Connect

    Kolekar, Sanved; Padmanabhan, T.

    2010-07-15

    The Einstein-Hilbert action and its natural generalizations to higher dimensions (like the Lanczos-Lovelock action) have certain peculiar features. All of them can be separated into a bulk and a surface term, with a specific (''holographic'') relationship between the two, so that either term can be used to extract information about the other. Further, the surface term leads to entropy of the horizons on shell. It has been argued in the past that these features are impossible to understand in the conventional approach but find a natural explanation if we consider gravity as an emergent phenomenon. We provide further support for this point of view in this paper. We describe an alternative decomposition of the Einstein-Hilbert action and the Lanczos-Lovelock action into a new pair of surface and bulk terms, such that the surface term becomes the Wald entropy on a horizon and the bulk term is the energy density (which is the Arnowitt-Deser-Misner Hamiltonian density for Einstein gravity). We show that this new pair also obeys a holographic relationship, and we give a thermodynamic interpretation of this relation in this context. Since the bulk and surface terms, in this decomposition, are related to the energy and entropy, the holographic condition can be thought of as analogous to inverting the expression for entropy given as a function of energy S=S(E,V) to obtain the energy E=E(S,V) in terms of the entropy in a normal thermodynamic system. Thus the holographic nature of the action allows us to relate the descriptions of the same system in terms of two different thermodynamic potentials. Some further possible generalizations and implications are discussed.

  2. Superfund Record of Decision (EPA Region 1): Stamina Mills site, North Smithfield, RI. (First remedial action), September 1990. Final report

    SciTech Connect

    Not Available

    1990-09-28

    The five-acre Stamina Mills site is a former textile weaving and finishing facility in North Smithfield, Providence County, Rhode Island. A portion of the site is within the 100-year floodplain and wetland area of the Branch River. The manufacturing process used cleaning solvents, acids, bases and dyes for coloring, pesticides for moth proofing, and plasticizers to coat fabrics. Mill process wastes were placed in a landfill onsite. EPA initiated three removal actions from 1984 to 1990, including an extension of the municipal water supply to residents obtaining water from the affected aquifer; and treatment of two underground and one above-ground storage tanks, followed by offsite disposal. The Record of Decision (ROD) provides a final remedy and addresses both source control and management of contaminated ground water migration at the site. The primary contaminants of concern affecting the soil, debris, sediment, and ground water are VOCs including TCE and PCE; other organics including pesticides; and metals including chromium.

  3. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  4. Superfund Record of Decision (EPA Region 5): Washington County Landfill, lake Elmo, MN. (Second remedial action), November 1990. Final report

    SciTech Connect

    Not Available

    1990-11-15

    The 40-acre Washington County Landfill site is an inactive sanitary landfill in Lake Elmo, Washington County, Minnesota. Land use in the area is predominantly residential and agricultural. From 1969 to 1975, Washington and Ramsey counties used the site as a sanitary landfill. Monitoring by Washington County in 1981 revealed low level VOC contamination, which poses a health risk based on long-term ingestion of ground water. The ROD addresses a final remedy for drinking water supply as part of a second operable unit. The primary contaminants of concern affecting the ground water are VOCs including benzene, PCE, TCE, and xylenes. The selected remedial action for the site includes providing a municipal drinking water supply system to supply drinking water to 10 homes with private wells that have been affected by the contaminant plume; and continuing operation of the gradient control well and spray-irrigation treatment system for the first operable unit.

  5. Superfund record of decision (EPA Region 5): Peerless Plating, Muskegon Township, MI. (First remedial action), September 1992. Final report

    SciTech Connect

    Not Available

    1992-09-21

    The 1-acre Peerless Plating site is a former electroplating facility in Muskegon Township, Michigan, and is located northwest of Little Black Creek and 1 mile north of Mona Lake. Lake Michigan supplies drinking water for residential and commercial businesses within a 3-mile radius of the site. From 1937 to 1983, onsite electroplating operations and processes included copper, nickel, chromium, cadmium, and zinc plating, in addition to burnishing, polishing, pickling, oiling, passivating, stress relieving, and dichromate dipping. In the 1970s, the state directed Peerless Plating to monitor waste discharge daily and to install a treatment system to meet reduced effluent limitations. The site violated the requirements and was charged by the state. The ROD addresses the onsite contaminated soil and ground water as a final remedy. The primary contaminants of concern are VOCs, including benzene, TCE, toluene, and xylenes; metals, including arsenic, chromium, and lead; and inorganics, including cyanide. The selected remedial action for the site are included.

  6. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    SciTech Connect

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  7. Interim response action, basin F liquid incineration project. Draft final human health assessment. Volume 2. Appendices

    SciTech Connect

    1993-09-01

    The multipathway human health risk assessment based on the SQI emission rate measured during the trial burn of basin F liquid indicates that the maximum level of human health risk associated with operation of this incinerator will not exceed the benchmark risk levels defined in the final decision document (Woodward-Clyde, 1990).

  8. 75 FR 58016 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... in the Final Environmental Assessment (FEA) and Finding of No Significant Impact (FONSI) for the project, both approved on July 30, 2010, and in other documents in Caltrans project records. The FEA, and... address provided above. The FEA can be viewed and downloaded from the project Web site at...

  9. 76 FR 54529 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... were taken, are described in the Final Environmental Assessment (FEA) for the project. A Finding of No Significant Impact (FONSI) was approved on July 8, 2011. The FEA, FONSI, and other project records are available by contacting Caltrans at the addresses provided above. The Caltrans FEA and FONSI can be...

  10. Interim response action, basin F liquid incineration project. Draft final human health assessment. Volume 1

    SciTech Connect

    1993-09-02

    The multipathway human health risk assessment based on the SQ1 emission rates measured during the trial burn of basin F liquid indicates that the maximum level of human health risk associated with operation of this incinerator will not exceed the benchmark risk levels defined in the final decision document (Woodward-Clyde, 1990).

  11. 17 CFR 171.42 - Notice of a final decision of the National Futures Association in a member responsibility action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the National Futures Association in a member responsibility action. 171.42 Section 171.42 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES RELATING TO REVIEW OF NATIONAL FUTURES ASSOCIATION DECISIONS IN DISCIPLINARY, MEMBERSHIP DENIAL, REGISTRATION AND MEMBER...

  12. 78 FR 24794 - Notice of Final Federal Agency Actions on the Proposed Presque Isle Bypass in Aroostook County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... Isle Bypass FEIS located in the Town of Presque Isle, Aroostook County, Maine. Those actions grant... Governments. (Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and...

  13. Feasibility study of contamination remediation at Naval Weapons Station, Concord, California. Volume 1. Remedial-action alternatives. Final report

    SciTech Connect

    Cullinane, M.J.; Lee, C.R.; O'Neil, L.J.

    1988-09-01

    This report identifies and describes potential remedial actions to eliminate or mitigate the release of hazardous substances onto lands of the Naval Weapons Station, Concord, CA. Hazardous substances identified as necessitating remedial actions include lead, cadmium, zinc, copper, selenium, and arsenic. The proposed remedial actions are designed to address existing or potential impacts identified in a separate study. These identified impacts include: contamination of soil with metals; contamination and toxicity in plants and soil invertebrates; reduced plant growth; increased soil acidity; surface water contamination; air contamination; loss of quantity and quality of wildlife habitat; loss of wetland function; and loss of ultimate land use. The release of hazardous substances at seven sites was identified in the remedial investigation. The seven individual areas were consolidated into four remedial action subsites (RASS's) based on an analysis of the topography and nature of the habitat.

  14. 76 FR 18548 - Clean Water Act Section 303(d): Final Agency Action on Three Total Maximum Daily Loads (TMDLs) in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... Louisiana AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... an inspection. FOR FURTHER INFORMATION CONTACT: Diane Smith, Environmental Protection...

  15. Record of decision remedial alternative selection for the Grace Road site (631-22G) operable unit: Final action

    SciTech Connect

    Palmer, E.

    1997-01-01

    This decision document presents the selected remedial action for the Grace Road Site located at the Savannah River Site near Aiken, South Carolina. The selected action was developed in accordance with CERCLA, as amended, and to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The selected remedy satisfies both CERCLA and RCRA 3004 requirements. This decision is based on the Administrative Record File for this specific RCRA/CERCLA unit.

  16. Record of Decision Remedial Alternative Selection for the Gunsite 113 Access Road (631-24G) Operable Unit: Final Action

    SciTech Connect

    Palmer, E.

    1997-01-01

    This decision document presents the selected remedial action for the Gunsite 113 Access Road Unit located at the Savannah River Site near Aiken, SC. The selected action was developed in accordance with CERCLA, as amended, and to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The selected remedy satisfies both CERCLA and RCRA 3004(U) requirements. This decision is based ont he Administrative Record File for this specific RCRA/CERCLA Unit.

  17. A Metadata Action Language

    NASA Technical Reports Server (NTRS)

    Golden, Keith; Clancy, Dan (Technical Monitor)

    2001-01-01

    The data management problem comprises data processing and data tracking. Data processing is the creation of new data based on existing data sources. Data tracking consists of storing metadata descriptions of available data. This paper addresses the data management problem by casting it as an AI planning problem. Actions are data-processing commands, plans are dataflow programs and goals are metadata descriptions of desired data products. Data manipulation is simply plan generation and execution, and a key component of data tracking is inferring the effects of an observed plan. We introduce a new action language for data management domains, called ADILM. We discuss the connection between data processing and information integration and show how a language for the latter must be modified to support the former. The paper also discusses information gathering within a data-processing framework, and show how ADILM metadata expressions are a generalization of Local Completeness.

  18. Finding minimal action sequences with a simple evaluation of actions

    PubMed Central

    Shah, Ashvin; Gurney, Kevin N.

    2014-01-01

    Animals are able to discover the minimal number of actions that achieves an outcome (the minimal action sequence). In most accounts of this, actions are associated with a measure of behavior that is higher for actions that lead to the outcome with a shorter action sequence, and learning mechanisms find the actions associated with the highest measure. In this sense, previous accounts focus on more than the simple binary signal of “was the outcome achieved?”; they focus on “how well was the outcome achieved?” However, such mechanisms may not govern all types of behavioral development. In particular, in the process of action discovery (Redgrave and Gurney, 2006), actions are reinforced if they simply lead to a salient outcome because biological reinforcement signals occur too quickly to evaluate the consequences of an action beyond an indication of the outcome's occurrence. Thus, action discovery mechanisms focus on the simple evaluation of “was the outcome achieved?” and not “how well was the outcome achieved?” Notwithstanding this impoverishment of information, can the process of action discovery find the minimal action sequence? We address this question by implementing computational mechanisms, referred to in this paper as no-cost learning rules, in which each action that leads to the outcome is associated with the same measure of behavior. No-cost rules focus on “was the outcome achieved?” and are consistent with action discovery. No-cost rules discover the minimal action sequence in simulated tasks and execute it for a substantial amount of time. Extensive training, however, results in extraneous actions, suggesting that a separate process (which has been proposed in action discovery) must attenuate learning if no-cost rules participate in behavioral development. We describe how no-cost rules develop behavior, what happens when attenuation is disrupted, and relate the new mechanisms to wider computational and biological context. PMID:25506326

  19. Atoms in Action

    SciTech Connect

    2009-01-01

    This movie produced with Berkeley Lab's TEAM 0.5 microscope shows the growth of a hole and the atomic edge reconstruction in a graphene sheet. An electron beam focused to a spot on the sheet blows out the exposed carbon atoms to make the hole. The carbon atoms then reposition themselves to find a stable configuration. http://newscenter.lbl.gov/press-releases/2009/03/26/atoms-in-action/

  20. Empirical microeconomics action functionals

    NASA Astrophysics Data System (ADS)

    Baaquie, Belal E.; Du, Xin; Tanputraman, Winson

    2015-06-01

    A statistical generalization of microeconomics has been made in Baaquie (2013), where the market price of every traded commodity, at each instant of time, is considered to be an independent random variable. The dynamics of commodity market prices is modeled by an action functional-and the focus of this paper is to empirically determine the action functionals for different commodities. The correlation functions of the model are defined using a Feynman path integral. The model is calibrated using the unequal time correlation of the market commodity prices as well as their cubic and quartic moments using a perturbation expansion. The consistency of the perturbation expansion is verified by a numerical evaluation of the path integral. Nine commodities drawn from the energy, metal and grain sectors are studied and their market behavior is described by the model to an accuracy of over 90% using only six parameters. The paper empirically establishes the existence of the action functional for commodity prices that was postulated to exist in Baaquie (2013).

  1. Archetypes as action patterns.

    PubMed

    Hogenson, George B

    2009-06-01

    The discovery of mirror neurons by researchers at the University of Parma promises to radically alter our understanding of fundamental cognitive and affective states. This paper explores the relationship of mirror neurons to Jung's theory of archetypes and proposes that archetypes may be viewed as elementary action patterns. The paper begins with a review of a proposed interpretation of the fainting spells of S. Freud in his relationship with Jung as an example of an action pattern that also defines an archetypal image. The challenge that mirror neurons present to traditional views in analytical psychology and psychoanalysis, however, is that they operate without recourse to a cognitive processing element. This is a position that is gaining increasing acceptance in other fields as well. The paper therefore reviews the most recent claims made by the Boston Process of Change Study Group as well as conclusions drawn from dynamic systems views of development and theoretical robotics to underline the conclusion that unconscious agency is not a requirement for coherent action. It concludes with the suggestion that this entire body of research may lead to the conclusion that the dynamic unconscious is an unnecessary hypothesis in psychoanalysis and analytical psychology. PMID:19531123

  2. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    SciTech Connect

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  3. Action spectra for photosynthetic inhibition

    NASA Technical Reports Server (NTRS)

    Caldwell, M. M.; Flint, S.; Camp, L. B.

    1981-01-01

    The ultraviolet action spectrum for photosynthesis inhibition was determined to fall between that of the general DNA action spectrum and the generalized plant action spectrum. The characteristics of this action spectrum suggest that a combination of pronounced increase in effectiveness with decreasing wavelength, substantial specificity for the UV-B waveband, and very diminished response in the UV-A waveband result in large radiation amplification factors when the action spectra are used as weighting functions. Attempted determination of dose/response relationships for leaf disc inhibition provided inconclusive data from which to deconvolute an action spectrum.

  4. Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

    SciTech Connect

    Jeremy Gwin and Douglas Frenette

    2010-09-30

    This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values and corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room

  5. Improving Teaching with Collaborative Action Research: An ASCD Action Tool

    ERIC Educational Resources Information Center

    Cunningham, Diane

    2011-01-01

    Once you've established a professional learning community (PLC), you need to get this ASCD (Association for Supervision and Curriculum Development) action tool to ensure that your PLC stays focused on addressing teaching methods and student learning problems. This ASCD action tool explains how your PLC can use collaborative action research to…

  6. On the Inclusion of Externally Controlled Actions in Action Planning

    ERIC Educational Resources Information Center

    Tsai, Jessica Chia-Chin; Knoblich, Gunther; Sebanz, Natalie

    2011-01-01

    According to ideomotor theories, perceiving action effects produced by others triggers corresponding action representations in the observer. We tested whether this principle extends to actions performed by externally controlled limbs and tools. Participants performed a go-no-go version of a spatial compatibility task in which their own actions…

  7. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect

    L. O. Nelson

    2003-09-01

    This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

  8. Determination and confirmation of narasin and monensin in chicken, swine, and bovine tissues by LC/MS/MS: Final Action 2011.24.

    PubMed

    Lombardi, Kimberly R; Burnett, Thomas J; Brunelle, Sharon L; Ulrey, W Dennis; Coleman, Mark R

    2013-01-01

    A multilaboratory study was conducted to validate the reproducibility of AOAC Official Method 2011.24 for determination of narasin and monensin in chicken, swine, and bovine tissues. This study was intended to satisfy requirements for Final Action status through the AOAC Expert Review Panel process. Ten laboratories participated in the study, analyzing blind duplicates of five incurred residue materials for each analyte. After removal of invalid data sets, the method reproducibility (RSDR 12.8-60.6%, HorRat 0.45-1.47) was within AOAC acceptance criteria. The method was awarded Final Action status by the Official Methods Board on October 4, 2012. PMID:24000767

  9. Developing an action concept inventory

    NASA Astrophysics Data System (ADS)

    McGinness, Lachlan P.; Savage, C. M.

    2016-06-01

    We report on progress towards the development of an Action Concept Inventory (ACI), a test that measures student understanding of action principles in introductory mechanics and optics. The ACI also covers key concepts of many-paths quantum mechanics, from which classical action physics arises. We used a multistage iterative development cycle for incorporating expert and student feedback into successive revisions of the ACI. The student feedback, including think-aloud interviews, enabled us to identify their misconceptions about action physics.

  10. Strong acoustic wave action

    NASA Astrophysics Data System (ADS)

    Gokhberg, M. B.

    1983-07-01

    Experiments devoted to acoustic action on the atmosphere-magnetosphere-ionosphere system using ground based strong explosions are reviewed. The propagation of acoustic waves was observed by ground observations over 2000 km in horizontal direction and to an altitude of 200 km. Magnetic variations up to 100 nT were detected by ARIEL-3 satellite near the epicenter of the explosion connected with the formation of strong field aligned currents in the magnetosphere. The enhancement of VLF emission at 800 km altitude is observed.

  11. Neurobiological actions of cysteamine

    SciTech Connect

    Brown, M.; Fisher, L.; Mason, R.T.; Rivier, J.; Vale, W.

    1985-06-01

    Somatostatin (SS)-related peptides act within discrete brain regions to inhibit adrenal epinephrine (E) secretion, to prevent hypothermia, and to produce hyperthermia. Depletion of brain concentrations of these SS-related peptides using cysteamine (CSH) or central administration of an SS receptor antagonist increases adrenal E secretion and impairs thermoregulation. These actions of CSH and the SS receptor antagonist are reversed by administration of SS into the central nervous system. These results support the hypothesis that endogenous brain SS-related peptides are involved in the regulation of adrenal E secretion and thermoregulation.

  12. 3RS action plan

    SciTech Connect

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  13. VIOLENT FRAMES IN ACTION

    SciTech Connect

    Sanfilippo, Antonio P.; McGrath, Liam R.; Whitney, Paul D.

    2011-11-17

    We present a computational approach to radical rhetoric that leverages the co-expression of rhetoric and action features in discourse to identify violent intent. The approach combines text mining and machine learning techniques with insights from Frame Analysis and theories that explain the emergence of violence in terms of moral disengagement, the violation of sacred values and social isolation in order to build computational models that identify messages from terrorist sources and estimate their proximity to an attack. We discuss a specific application of this approach to a body of documents from and about radical and terrorist groups in the Middle East and present the results achieved.

  14. Professional licensure: investigation and disciplinary action.

    PubMed

    Brous, Edie

    2012-11-01

    This is the second article in a three-part series on nursing boards' disciplinary actions and what nurses need to know to maintain their license in good standing. This article discusses common reasons boards of nursing conduct investigations and take disciplinary action. The third and final article will discuss strategies for protecting your license. PMID:23099588

  15. 32 CFR 723.8 - Staff action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the...

  16. Solving Wicked Problems through Action Learning

    ERIC Educational Resources Information Center

    Crul, Liselore

    2014-01-01

    This account of practice outlines the Oxyme Action Learning Program which was conducted as part of the Management Challenge in my final year of the MSc in Coaching and Behavioral Change at Henley Business School. The central research questions were: (1) how action learning can help to solve wicked problems and (2) what the effect of an action…

  17. The Concept of Action Learning.

    ERIC Educational Resources Information Center

    Zuber-Skerritt, Ortrun

    2002-01-01

    Based on classic and emerging international literature, action learning is defined as learning form concrete experience and critical reflection on experience, focused on problem solving and change. Facilitators of action learning do not impose solutions but guide action learning teams through the process. (Contains 44 references.) (SK)

  18. Must Affirmative Action Be Divisive?

    ERIC Educational Resources Information Center

    Fineberg, Solomon Andhil

    1975-01-01

    Affirmative action is seen as causing dissension and cleavages in the civil rights coalition. Requisites suggested for winning support for affirmative action are thorough knowledge of its rationale and components, assuring whites they will not be pushed out of jobs, and a continued emphasis on the urgency for affirmative action. (Author/AM)

  19. Motor Execution Affects Action Prediction

    ERIC Educational Resources Information Center

    Springer, Anne; Brandstadter, Simone; Liepelt, Roman; Birngruber, Teresa; Giese, Martin; Mechsner, Franz; Prinz, Wolfgang

    2011-01-01

    Previous studies provided evidence of the claim that the prediction of occluded action involves real-time simulation. We report two experiments that aimed to study how real-time simulation is affected by simultaneous action execution under conditions of full, partial or no overlap between observed and executed actions. This overlap was analysed by…

  20. Action Research: Trends and Variations

    ERIC Educational Resources Information Center

    Beaulieu, Rodney J.

    2013-01-01

    Action research continues to grow as a research tradition, yet misconceptions about what it is and is not remains, even among scholars. For example, some mistakenly believe action research is only about professional development and is not a scholarly research approach. Some assume action research must be accomplished through a collaborative…

  1. Developing an Action Concept Inventory

    ERIC Educational Resources Information Center

    McGinness, Lachlan P.; Savage, C. M.

    2016-01-01

    We report on progress towards the development of an Action Concept Inventory (ACI), a test that measures student understanding of action principles in introductory mechanics and optics. The ACI also covers key concepts of many-paths quantum mechanics, from which classical action physics arises. We used a multistage iterative development cycle for…

  2. Linking differences in action perception with differences in action execution

    PubMed Central

    Macerollo, A.; Bose, S.; Ricciardi, L.; Edwards, M. J.

    2015-01-01

    Successful human social interactions depend upon the transmission of verbal and non-verbal signals from one individual to another. Non-verbal social communication is realized through our ability to read and understand information present in other people’s actions. It has been proposed that employing the same motor programs, we use to execute an action when observing the same action underlies this action understanding. The main prediction of this framework is that action perception should be strongly correlated with parameters of action execution. Here, we demonstrate that subjects’ sensitivity to observed movement speeds is dependent upon how quickly they themselves executed the observed action. This result is consistent with the motor theory of social cognition and suggests that failures in non-verbal social interactions between individuals may in part result from differences in how those individuals move. PMID:25691777

  3. Wave action power plant

    SciTech Connect

    Lucia, L.V.

    1982-03-16

    A wave action power plant powered by the action of water waves has a drive shaft rotated by a plurality of drive units, each having a lever pivotally mounted on and extending from said shaft and carrying a weight, in the form of a float, which floats on the waves and rocks the lever up and down on the shaft. A ratchet mechanism causes said shaft to be rotated in one direction by the weight of said float after it has been raised by wave and the wave has passed, leaving said float free to move downwardly by gravity and apply its full weight to pull down on the lever and rotate the drive shaft. There being a large number of said drive units so that there are always some of the weights pulling down on their respective levers while other weights are being lifted by waves and thereby causing continuous rotation of the drive shaft in one direction. The said levers are so mounted that they may be easily raised to bring the weights into a position wherein they are readily accessible for cleaning the bottoms thereof to remove any accumulation of barnacles, mollusks and the like. There is also provided means for preventing the weights from colliding with each other as they independently move up and down on the waves.

  4. Ovarian actions of resveratrol.

    PubMed

    Ortega, Israel; Duleba, Antoni J

    2015-08-01

    Resveratrol, a natural polyphenol found in grapes, berries, and medicinal plants, exhibits antioxidant and anti-inflammatory activities and has been proposed to be a longevity-prolonging agent. There is also growing evidence that resveratrol has cardioprotective properties and beneficial effects on both glucose and lipid metabolism. Recently, several studies have examined the use of resveratrol as a therapeutic agent to treat numerous pathological and metabolic disorders. Herein, we present insights into the mechanisms of action, biological effects, and current evidence of actions of resveratrol on the ovary. In vitro, resveratrol inhibits proliferation and androgen production by theca-interstitial cells. Resveratrol also exerts a cytostatic, but not cytotoxic, effect on granulosa cells, while decreasing aromatization and vascular endothelial growth factor expression. In vivo, resveratrol treatment reduced the size of adipocytes and improved estrus cyclicity in the previously acyclic rat model of polycystic ovary syndrome (PCOS). In addition, resveratrol increased the ovarian follicular reserve and prolonged the ovarian life span in rats. Taken together, resveratrol emerges as a potential therapeutic agent to treat conditions associated with androgen excess, such as PCOS. The efficacy of resveratrol in the treatment of gynecological conditions requires further investigation. PMID:26315293

  5. Neuroprotective Actions of Neurosteroids

    PubMed Central

    Borowicz, Kinga K.; Piskorska, Barbara; Banach, Monika; Czuczwar, Stanislaw J.

    2011-01-01

    Neurosteroids were initially defined as steroid hormones locally synthesized within the nervous tissue. Subsequently, they were described as steroid hormone derivatives that devoid hormonal action but still affect neuronal excitability through modulation of ionotropic receptors. Neurosteroids are further subdivided into natural (produced in the brain) and synthetic. Some authors distinguish between hormonal and regular neurosteroids in the group of natural ones. The latter group, including hormone metabolites like allopregnanolone or tetrahydrodeoxycorticosterone, is devoid of hormonal activity. Both hormones and their derivatives share, however, most of the physiological functions. It is usually very difficult to distinguish the effects of hormones and their metabolites. All these substances may influence seizure phenomena and exhibit neuroprotective effects. Neuroprotection offered by steroid hormones may be realized in both genomic and non-genomic mechanisms and involve regulation of the pro- and anti-apoptotic factors expression, intracellular signaling pathways, neurotransmission, oxidative, and inflammatory processes. Since regular neurosteroids show no affinity for steroid receptors, they may act only in a non-genomic mode. Multiple studies have been conducted so far to show efficacy of neurosteroids in the treatment of the central and peripheral nervous system injury, ischemia, neurodegenerative diseases, or seizures. In this review we focused primarily on neurosteroid mechanisms of action and their role in the process of neurodegeneration. Most of the data refers to results obtained in experimental studies. However, it should be realized that knowledge about neuroactive steroids remains still incomplete and requires confirmation in clinical conditions. PMID:22649375

  6. Superfund Record of Decision (EPA Region 6): Arkwood, Inc. , Omaha, AR. (First remedial action), September 1990. Final report

    SciTech Connect

    Not Available

    1990-09-28

    The 15-acre Arkwood site is a former wood treatment facility in Boone County, Arkansas. Land use in the vicinity of the site is primarily agricultural and light industrial. Ground water on, or near the site is highly susceptible to contamination as a result of underground cavities, enlarged fractures and conduits which hinder monitoring and pumping. State investigations conducted during the 1980s documented PCP and creosote contamination in surface water, soil, debris, and buildings throughout the site. Contaminated surface features at the site include the wood treatment facility, a sinkhole area contaminated with oily waste, a ditch area, a wood storage area, and an ash pile. In 1987, EPA ordered the site owner to perform an immediate removal action, which included implementing site access including fencing and sign postings. The Record of Decision (ROD) addresses remediation of all affected media, and provides the final remedy for the site. The primary contaminants of concern affecting the soil, sludge, debris, ground water and surface water are organics including pentachlorophenol (PCP), PAHs, and dioxin; and oils.

  7. Final Legislative and Budget Actions in Kentucky, Mississippi, Oklahoma, South Carolina and Texas: Notes from Other SREB States. Legislative Report No. 4

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2010

    2010-01-01

    The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. The reports include bill numbers and legislative Web site…

  8. Governors' Proposals in Delaware, Louisiana, North Carolina and Tennessee; Final Actions in Georgia and Kentucky; Notes from Other SREB States. Legislative Report No. 3

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2009

    2009-01-01

    The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. The reports include bill numbers and legislative Web site…

  9. The minimalist grammar of action

    PubMed Central

    Pastra, Katerina; Aloimonos, Yiannis

    2012-01-01

    Language and action have been found to share a common neural basis and in particular a common ‘syntax’, an analogous hierarchical and compositional organization. While language structure analysis has led to the formulation of different grammatical formalisms and associated discriminative or generative computational models, the structure of action is still elusive and so are the related computational models. However, structuring action has important implications on action learning and generalization, in both human cognition research and computation. In this study, we present a biologically inspired generative grammar of action, which employs the structure-building operations and principles of Chomsky's Minimalist Programme as a reference model. In this grammar, action terminals combine hierarchically into temporal sequences of actions of increasing complexity; the actions are bound with the involved tools and affected objects and are governed by certain goals. We show, how the tool role and the affected-object role of an entity within an action drives the derivation of the action syntax in this grammar and controls recursion, merge and move, the latter being mechanisms that manifest themselves not only in human language, but in human action too. PMID:22106430

  10. Willed action and its impairments.

    PubMed

    Jahanshahi, M

    1998-09-01

    Actions are goal-directed behaviours that usually involve movem ent. There is evidence that intentional self-generated actions (willed actions) are controlled differently from routine, stereotyped actions that are externally triggered by environmental stimuli. We review evidence from investigations using positron emission tomography (PET), recordings of movement-related cortical potentials (MRCPs) or transcranial magnetic stimulation (TMS), and conclude that willed actions are controlled by a network of frontal cortical (dorsolateral prefrontal cortex, supplementary motor area, anterior cingulate) and subcortical (thalamus and basal ganglia) areas. We also consider evidence suggesting that some of the cognitive and motor deficits of patients with frontal lesions, Parkinson's disease, or schizophrenia as well as apathy and abulia and rarer phenomena such as primary obsessional slowness can be considered as reflecting im pairment of willed actions. We propose that the concept of a willed action system based on the frontostriatal circuits provides a useful framework for integrating the cognitive, motor, and motivational deficits found in these disorders. Problems remaining to be resolved include: identification of the component processes of willed actions; the specific and differential role played by each of the frontal cortical and subcortical areas in the control of willed actions; the specific mechanisms of impairm ent of willed actions in Parkinson's disease, schizophrenia, and frontal damage; and the precise role of the neurotransmitter dopamine in the willed action system. PMID:22448836

  11. 77 FR 39795 - Notice of Final Federal Agency Actions on the Interstate 395 High Occupancy (HOV) Vehicle Ramp at...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... Occupancy (HOV) Vehicle Ramp at Seminary Road Project in Virginia AGENCY: Federal Highway Administration...). The actions relate to the Interstate 395 High Occupancy Vehicle (HOV) Ramp at Seminary Road project in... 395 High Occupancy Vehicle (HOV) Ramp at Seminary Road. The project would involve construction of...

  12. The Law and Collective Negotiations in Education. Volume II, Collective Action by Public School Teachers. Final Report.

    ERIC Educational Resources Information Center

    Wildman, Wesley A.

    This volume on law and collective negotiations in the schools is the second in a series of 4 monographs comprising a broad investigation of teacher collective action in local school districts in the United States. Part I (30 pages) of this volume deals with emerging local doctrine relating to the rights of teachers and other public employees to…

  13. 75 FR 62919 - Notice of Final Federal Agency Actions on the Route 250 Bypass Interchange at McIntire Road...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... at McIntire Road Project in Virginia AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... the Route 250 Bypass Interchange at McIntire Road project in the City of Charlottesville, Virginia... approvals for the following project in the State of Virginia: Route 250 Bypass Interchange at McIntire...

  14. 75 FR 32835 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Actions on Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    ...). The actions relate to a proposed highway project, the Interstate 10 High Occupancy Toll Lanes project... Occupancy Vehicle Lane into a High Occupancy Toll (HOT) Lane on I-10 San Bernardino Freeway/El Monte Busway. Work involves installation of signage and toll infrastructure, restriping of the existing lanes...

  15. 75 FR 25309 - Notice of Final Federal Agency Actions on Proposed Expanded Intermodal Freight Terminal in Michigan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Freight Terminal in Michigan AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of... Yard, also known as the Detroit Intermodal Freight Terminal (DIFT) and associated external-to-terminal... following expansion project in the State of Michigan: Detroit Intermodal Freight Terminal. The...

  16. 17 CFR 240.19d-1 - Notices by self-regulatory organizations of final disciplinary actions, denials, bars, or...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... required in the statement supporting the organization's determination required by section 6(d) (1) or (2... action in which a national securities exchange imposes a fine not exceeding $1000 or suspends floor... imposed consists of a fine not exceeding $2500 and the sanctioned person has not sought an...

  17. 75 FR 3277 - Notice of Final Federal Agency Actions on State Highway 99 (Segment F-2) in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... Protection Policy Act (FPPA) [7 U.S.C. 4201-4209]. 7. Wetlands and Water Resources: Clean Water Act [33 U.S.C. 1251- 1342]; Land and Water Conservation Fund (LWCF) . 8. Executive Orders: E.O. 11990 Protection of... Texas AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims...

  18. The Quench Action

    NASA Astrophysics Data System (ADS)

    Caux, Jean-Sébastien

    2016-06-01

    We give a pedagogical introduction to the methodology of the Quench Action, which is an effective representation for the calculation of time-dependent expectation values of physical operators following a generic out-of-equilibrium state preparation protocol (for example a quantum quench). The representation, originally introduced in Caux and Essler (2013 Phys. Rev. Lett. 110 257203), is founded on a mixture of exact data for overlaps together with variational reasonings. It is argued to be quite generally valid and thermodynamically exact for arbitrary times after the quench (from short times all the way up to the steady state), and applicable to a wide class of physically relevant observables. Here, we introduce the method and its language, give an overview of some recent results, suggest a roadmap and offer some perspectives on possible future research directions.

  19. Guam Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  20. Cardiovascular actions of berberine.

    PubMed

    Lau, C W; Yao, X Q; Chen, Z Y; Ko, W H; Huang, Y

    2001-01-01

    Berberine, is an alkaloid from Hydrastis canadensis L., Chinese herb Huanglian, and many other plants. It is widely used in traditional Chinese medicine as an antimicrobial in the treatment of dysentery and infectious diarrhea. This manuscript describes cardiovascular effects of berberine and its derivatives, tetrahydroberberine and 8-oxoberberine. Berberine has positive inotropic, negative chronotropic, antiarrhythmic, and vasodilator properties. Both derivatives of berberine have antiarrhythmic activity. Some cardiovascular effects of berberine and its derivatives are attributed to the blockade of K+ channels (delayed rectifier and K(ATP)) and stimulation of Na+ -Ca(2+) exchanger. Berberine has been shown to prolong the duration of ventricular action potential. Its vasodilator activity has been attributed to multiple cellular mechanisms. The cardiovascular effects of berberine suggest its possible clinical usefulness in the treatment of arrhythmias and/or heart failure. PMID:11607041

  1. Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume II. Appendices

    SciTech Connect

    Not Available

    1983-07-01

    This report provides a summary of the conceptual design and other information necessary to understand the proposed remedial action at the expanded Canonsburg, Pennsylvania site. This design constitutes the current approach to stabilizing the radioactively contaminated materials in place in a manner that would fully protect the public health and environment. This summary is intended to provide sufficient detail for the reader to understand the proposed remedial action and the anticipated environmental impacts. The site conceptual design has been developed using available data. In some cases, elements of the design have not been developed fully and will be made final during the detailed design process.

  2. Riverland expedited response action proposal

    SciTech Connect

    Not Available

    1993-04-01

    The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

  3. Everyday robotic action: lessons from human action control

    PubMed Central

    de Kleijn, Roy; Kachergis, George; Hommel, Bernhard

    2014-01-01

    Robots are increasingly capable of performing everyday human activities such as cooking, cleaning, and doing the laundry. This requires the real-time planning and execution of complex, temporally extended sequential actions under high degrees of uncertainty, which provides many challenges to traditional approaches to robot action control. We argue that important lessons in this respect can be learned from research on human action control. We provide a brief overview of available psychological insights into this issue and focus on four principles that we think could be particularly beneficial for robot control: the integration of symbolic and subsymbolic planning of action sequences, the integration of feedforward and feedback control, the clustering of complex actions into subcomponents, and the contextualization of action-control structures through goal representations. PMID:24672474

  4. Superfund Record of Decision (EPA Region 6): Brio Refining Site, Harris County, Texas, March 1988. First remedial action. Final report

    SciTech Connect

    Not Available

    1988-03-31

    The 58-acre Brio Refining site is located in Harris County, Texas, approximately 20 miles southeast of Houston. The site is broken into two parcels, 49-acre Brio North and 9-acre Brio South, separated by Drive Farm Road. Between 1957 and 1982 the site refined crude oil and styrene tars to produce toluene, ethylbenzene, solvents, naphthalene, diesel fuel and kerosene. Site investigation indicate that between 500,000-700,000 sq yds of onsite soil have measurable contamination, and that high levels of VOCs exist in ground water underlying the site. The selected remedial action for the Brio Refining site includes: Excavation and incineration or biological treatment of all onsite soils, sludges, and liquids found to be above action levels defined in the Endangerment Assessment, with backfilling of all treated material passing the Toxicity Characteristics Leaching Procedure (TCLP).

  5. On "action language" in psychoanalysis.

    PubMed

    Calogeras, R C; Alston, T M

    1980-10-01

    The main tenets of action language are summarized in an attempt to discern the direction in which psychoanalysis might go if action language becomes the "new metapsychology." The principal roots of action language are traced to the different linguistic/language and personality-and-culture models of anthropology and to the neobehaviorist currents of academic psychology. The authors' findings support the hypothesis that action language is a form os psychoanalytic behaviorism having idealism, logical positivism, and radical empiricism as its philosophical underpinnings. Its adoption would confound the entire motivational aspect of psychoanalysis. Specifically, the authors suggest that action language falls under the aegis of Wittgenstein's family of language games. When the action language game is said to be brought to a successful resolution, the language game disappears and, supposedly, so do the patient's conflicts. PMID:7422749

  6. Superfund Record of Decision (EPA Region 6): Pagano Salvage site, Los Lunas, NM. (First remedial action), September 1990. Final report

    SciTech Connect

    Not Available

    1990-09-27

    The 1.4-acre Pagano Salvage site is in Los Lunas, Valencia County, New Mexico, and consists of a family-run salvage business and a residence. During 1983, salvage operations at the site included purchasing high technology scrap material from Federal facilities such as transformers, drums containing waste fluids, and capacitors. Site inspections in 1984, 1985, and 1986 revealed several areas of soil contamination in the yard due to leaks from scrap materials, which released PCB-contaminated oil into the soil. These areas included two surface burn areas, a stained soil area, and a surface pool of oil. In 1990, EPA removed approximately 5,100 cubic yards (i.e., soil in excess of 10 mg/kg PCBs based on TSCA cleanup policy) of contaminated soil and debris for disposal in an approved RCRA facility offsite. Soil containing less than 10 mg/kg PCB was covered with a 10-12 inch soil cover. Soil sampling has confirmed that this removal has resolved the PCB contamination at the site and EPA proposes no additional remedial action. Based on this rationale, there are no primary contaminants of concern affecting the site. The selected remedial action for the site is a no action remedy with ground water monitoring for one year at the request of the State.

  7. Superfund Record of Decision (EPA Region 3): Dublin Water Supply, Bucks County, PA. (First remedial action), December 1991. Final report

    SciTech Connect

    Not Available

    1991-12-30

    The 4.5-acre Dublin Water Supply is a former manufacturing facility located in Dublin Borough, Bucks County, Pennsylvania. The site consists of a one-story tower building and parking lot. The surrounding area is mixed commercial and residential, with a fruit orchard bordering the site to the north and west. Groundwater beneath the site contributes to the aquifer by providing a drinking water source to area residents. In 1986, the current owner purchased the site for antique car restoration. A portion of the site is currently leased to Laboratory Testing, Inc., for metallurgical testing. During a routine drinking water survey in 1986, the state discovered elevated levels of TCE affecting approximately 170 area homes. The early action ROD addresses the provision of a permanent clean drinking water supply to affected area residents and businesses. An additional RI/FS, which commenced in 1991, will focus on remediation of the soil, ground water, and surface water in a separate clean-up action. The primary contaminants of concern affecting ground water are VOCs, including TCE, PCE, and vinyl chloride. The selected remedial action for the site is included.

  8. 22 CFR 223.11 - Appropriate action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Appropriate action. 223.11 Section 223.11...-EMPLOYMENT RESTRICTIONS § 223.11 Appropriate action. The Administrator may take appropriate action in the... action....

  9. Representing actions through their sound.

    PubMed

    Aglioti, Salvatore M; Pazzaglia, Mariella

    2010-10-01

    Since the discovery of 'mirror neurons' in the monkey premotor and parietal cortex, an increasing body of evidence in animals and humans alike has supported the notion of the inextricable link between action execution and action perception. Although research originally focused on the relationship between performed and viewed actions, more recent studies highlight the importance of representing the actions of others through audition. In the first part of this article, we discuss animal studies, which provide direct evidence that action is inherently linked to multi-sensory cues, as well as the studies carried out on healthy subjects by using state-of-the-art cognitive neuroscience techniques such as functional magnetic resonance imaging (fMRI), event-related potentials (ERP), magnetoencephalography (MEG), and transcranial magnetic stimulation (TMS). In the second section, we review the lesion analysis studies in brain-damaged patients demonstrating the link between 'resonant' fronto-parieto-temporal networks and the ability to represent an action by hearing its sound. Moreover, we examine the evidence in favour of somatotopy as a possible representational rule underlying the auditory mapping of actions and consider the links between language and audio-motor action mapping. We conclude with a discussion of some outstanding questions for future research on the link between actions and the sounds they produce. PMID:20602092

  10. Numbers in Action

    PubMed Central

    Rugani, Rosa; Sartori, Luisa

    2016-01-01

    Humans show a remarkable tendency to describe and think of numbers as being placed on a mental number line (MNL), with smaller numbers located on the left and larger ones on the right. Faster responses to small numbers are indeed performed on the left side of space, while responses to large numbers are facilitated on the right side of space (spatial-numerical association of response codes, SNARC effect). This phenomenon is considered the experimental demonstration of the MNL and has been extensively replicated throughout a variety of paradigms. Nevertheless, the majority of previous literature has mainly investigated this effect by means of response times and accuracy, whereas studies considering more subtle and automatic measures such as kinematic parameters are rare (e.g., in a reaching-to-grasp movement, the grip aperture is enlarged in responding to larger numbers than in responding to small numbers). In this brief review we suggest that numerical magnitude can also affect the what and how of action execution (i.e., temporal and spatial components of movement). This evidence could have large implications in the strongly debated issue concerning the effect of experience and culture on the orientation of MNL. PMID:27524965

  11. Pharmacogenetics of FSH action

    PubMed Central

    Laan, Maris; Grigorova, Marina; Huhtaniemi, Ilpo T.

    2012-01-01

    Purpose of the review To review the current knowledge of genetic variants in the two genes affecting the individual responsiveness to follicle-stimulating hormone (FSH) action—the FSH beta-subunit (FSHB) and the FSH receptor (FSHR), as well as the pharmacogenetic ramifications of the findings. Recent findings Four common variants in FSHB/FSHR were shown to exhibit significant effect on FSH action: linked FSHR variants Thr307Ala and Asn680Ser determining common receptorisoforms, andgene expression affecting polymorphisms FSHR –29G/A and FSHB–211G/T. In women, the FSHR Thr307Ala/Asn680Ser polymorphisms show consistent predictive value for estimating the most optimal rFSH dosage in controlled ovarian hyperstimulation(COH).The same variants exhibit a potential for the pharmacogenetic assessment of the treatment ofPCOS. The FSHR–29G/A variant was also shown to contribute to ovarian response to COH. Pilot studies have suggestedthe FSHB–211TT-homozygous oligozoospermicmen with genetically determined low concentration of FSH, as potentially the best responders to FSH treatment; furthermore, modulation of this response by FSHR polymorphisms is possible. Summary Genetic variants in FSHB/FSHRexhibit a potential for pharmacogenetic applications in selecting appropriate treatment options (timing and dosage) in male and female conditions requiring or benefitting from FSH therapy. PMID:22499219

  12. Nonclassical Vitamin D Action

    PubMed Central

    Zittermann, Armin; Gummert, Jan F.

    2010-01-01

    It is becoming increasingly clear that vitamin D has a broad range of actions in the human body. Besides its well-known effects on calcium/phosphate homeostasis, vitamin D influences muscle function, cardiovascular homeostasis, nervous function, and the immune response. Vitamin D deficiency/insufficiency has been associated with muscle weakness and a high incidence of various chronic diseases such as cardiovascular disease, cancer, multiple sclerosis, and type 1 and 2 diabetes. Most importantly, low vitamin D status has been found to be an independent predictor of all-cause mortality. Several recent randomized controlled trials support the assumption that vitamin D can improve muscle strength, glucose homeostasis, and cardiovascular risk markers. In addition, vitamin D may reduce cancer incidence and elevated blood pressure. Since the prevalence of vitamin D deficiency/insufficiency is high throughout the world, there is a need to improve vitamin D status in the general adult population. However, the currently recommended daily vitamin D intake of 5-15 µg is too low to achieve an adequate vitamin D status in individuals with only modest skin synthesis. Thus, there is a need to recommend a vitamin D intake that is effective for achieving adequate circulating 25-hydroxyvitamin D concentrations (>75 nmol/L). PMID:22254030

  13. Less chalk more action

    NASA Astrophysics Data System (ADS)

    Mitriceski Andelkovic, Bojana; Jovic, Sladjana

    2016-04-01

    Less chalk more action Education should not be a mechanical system that operates according to the principles of the orders and implementation. Education should respect the basic laws of the develop and progress. Curiosity is the engine of achievement and children spontaneously and happily learn only if they get interested, if teacher wake up and stimulate their creativity and individuality. We would like to present classes that are realized as thematic teaching with several subjects involved: chemistry, geography, math, art and biology. Classes were organized for students at age from 10 to 13 years, every month during autumn and winter 2015. Better students identified themselves as teachers and presented peer education .Teachers were monitoring the process of teaching and help to develop links between younger and older students, where older students were educators to younger students. Also one student with special needs was involved in this activities and was supported by other students during the workshops The benefit from this project will be represented with evaluation marks. Evaluation table shows that group of ten students(age 10 to13 years) which are selected in October as children with lack of motivation for learning, got better marks, at the end of January , then they had it in the beginning of the semester.

  14. From Movements to Actions: Two Mechanisms for Learning Action Sequences

    ERIC Educational Resources Information Center

    Endress, Ansgar D.; Wood, Justin N.

    2011-01-01

    When other individuals move, we interpret their movements as discrete, hierarchically-organized, goal-directed actions. However, the mechanisms that integrate visible movement features into actions are poorly understood. Here, we consider two sequence learning mechanisms--transitional probability-based (TP) and position-based encoding…

  15. The Development of Action Planning in a Joint Action Context

    ERIC Educational Resources Information Center

    Paulus, Markus

    2016-01-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus.…

  16. Action selection and action value in frontal-striatal circuits

    PubMed Central

    Seo, Moonsang; Lee, Eunjeong; Averbeck, Bruno B.

    2012-01-01

    Summary The role that frontal-striatal circuits play in normal behavior remains unclear. Two of the leading hypotheses suggest that these circuits are important for action selection or reinforcement learning. To examine these hypotheses we carried out an experiment in which monkeys had to select actions in two different task conditions. In the first (random) condition actions were selected on the basis of perceptual inference. In the second (fixed) condition the animals used reinforcement from previous trials to select actions. Examination of neural activity showed that the representation of the selected action was stronger in lateral prefrontal cortex (lPFC), and occurred earlier in the lPFC than it did in the dorsal striatum (dSTR). In contrast to this, the representation of action values, in both the random and fixed conditions was stronger in the dSTR. Thus, the dSTR contains an enriched representation of action value, but it followed frontal cortex in action selection. PMID:22681697

  17. Remedial Action Plan and final design for stabilization of the inactive uranium mill tailings at Green River, Utah. Volume 1, Text, Appendices A, B, and C: Final report

    SciTech Connect

    Matthews, M.L.; Alkema, K.

    1991-03-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities that are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Green River, Utah. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the state of Utah and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state of Utah, and concurrence by the NRC, becomes Appendix 8 of the Cooperative Agreement.

  18. Habits as action sequences: hierarchical action control and changes in outcome value

    PubMed Central

    Dezfouli, Amir; Lingawi, Nura W.; Balleine, Bernard W.

    2014-01-01

    Goal-directed action involves making high-level choices that are implemented using previously acquired action sequences to attain desired goals. Such a hierarchical schema is necessary for goal-directed actions to be scalable to real-life situations, but results in decision-making that is less flexible than when action sequences are unfolded and the decision-maker deliberates step-by-step over the outcome of each individual action. In particular, from this perspective, the offline revaluation of any outcomes that fall within action sequence boundaries will be invisible to the high-level planner resulting in decisions that are insensitive to such changes. Here, within the context of a two-stage decision-making task, we demonstrate that this property can explain the emergence of habits. Next, we show how this hierarchical account explains the insensitivity of over-trained actions to changes in outcome value. Finally, we provide new data that show that, under extended extinction conditions, habitual behaviour can revert to goal-directed control, presumably as a consequence of decomposing action sequences into single actions. This hierarchical view suggests that the development of action sequences and the insensitivity of actions to changes in outcome value are essentially two sides of the same coin, explaining why these two aspects of automatic behaviour involve a shared neural structure. PMID:25267824

  19. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  20. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  1. 40 CFR 265.303 - Response actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....301(a) must develop and keep on site until closure of the facility a response action plan. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of...

  2. 40 CFR 264.304 - Response actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow...

  3. 40 CFR 265.259 - Response actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 265.254 must develop and keep on-site until closure of the facility a response action plan. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of...

  4. 40 CFR 264.223 - Response actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... § 264.221 (c) or (d) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section....

  5. 40 CFR 265.259 - Response actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 265.254 must develop and keep on-site until closure of the facility a response action plan. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of...

  6. 40 CFR 265.259 - Response actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... § 265.254 must develop and keep on-site until closure of the facility a response action plan. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of...

  7. 40 CFR 264.253 - Response actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) or (d) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the...

  8. 40 CFR 265.259 - Response actions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... § 265.254 must develop and keep on-site until closure of the facility a response action plan. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of...

  9. 40 CFR 264.223 - Response actions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 264.221 (c) or (d) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section....

  10. 40 CFR 264.304 - Response actions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow...

  11. 40 CFR 264.304 - Response actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow...

  12. 40 CFR 265.224 - Response actions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... action plan. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow rate into the leak detection system exceeds the...

  13. 40 CFR 264.223 - Response actions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... § 264.221 (c) or (d) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section....

  14. 40 CFR 265.224 - Response actions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... action plan. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow rate into the leak detection system exceeds the...

  15. 40 CFR 265.224 - Response actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... action plan. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow rate into the leak detection system exceeds the...

  16. 40 CFR 265.259 - Response actions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 265.254 must develop and keep on-site until closure of the facility a response action plan. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of...

  17. 40 CFR 264.304 - Response actions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow...

  18. 40 CFR 264.304 - Response actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow...

  19. Bodily action penetrates affective perception

    PubMed Central

    Rigutti, Sara; Gerbino, Walter

    2016-01-01

    Fantoni & Gerbino (2014) showed that subtle postural shifts associated with reaching can have a strong hedonic impact and affect how actors experience facial expressions of emotion. Using a novel Motor Action Mood Induction Procedure (MAMIP), they found consistent congruency effects in participants who performed a facial emotion identification task after a sequence of visually-guided reaches: a face perceived as neutral in a baseline condition appeared slightly happy after comfortable actions and slightly angry after uncomfortable actions. However, skeptics about the penetrability of perception (Zeimbekis & Raftopoulos, 2015) would consider such evidence insufficient to demonstrate that observer’s internal states induced by action comfort/discomfort affect perception in a top-down fashion. The action-modulated mood might have produced a back-end memory effect capable of affecting post-perceptual and decision processing, but not front-end perception. Here, we present evidence that performing a facial emotion detection (not identification) task after MAMIP exhibits systematic mood-congruent sensitivity changes, rather than response bias changes attributable to cognitive set shifts; i.e., we show that observer’s internal states induced by bodily action can modulate affective perception. The detection threshold for happiness was lower after fifty comfortable than uncomfortable reaches; while the detection threshold for anger was lower after fifty uncomfortable than comfortable reaches. Action valence induced an overall sensitivity improvement in detecting subtle variations of congruent facial expressions (happiness after positive comfortable actions, anger after negative uncomfortable actions), in the absence of significant response bias shifts. Notably, both comfortable and uncomfortable reaches impact sensitivity in an approximately symmetric way relative to a baseline inaction condition. All of these constitute compelling evidence of a genuine top-down effect on

  20. Toxic action/toxicity.

    PubMed

    Hathway, D E

    2000-02-01

    ,Z-muconaldehyde forms cyclic products containing a pyrrole residue linked to purine. Increased HbCO concentrations reduce the O2-carrying capacity of the blood, and the changed shape of the O2-Hb dissociation curve parallels disturbance in O2 unloading. CN- acts on electron transport and paralyses respiration. In telodrin poisoning, preconvulsive glutamine formation abstracts tricarboxylic acid intermediates incommensurately with normal cerebral respiration. Antigen-antibody complexing depletes the antibody titre, available against infection. At high doses of Cd, Cd-thionein filtered through the kidneys is reabsorbed and tubular lesions produced. Some organophosphate insecticides promote irreversible acetylcholinesterase phosphorylation and blockade nerve function, and others react with neurotoxic esterase to cause delayed neuropathy. The evidence for Paraquat pulmonary poisoning suggests a radical mechanism involving three interrelated cyclic reaction stages. The action of N- and O8 (O substituent in 6-position of the purine) demethylases explains deletion mechanisms for DNA-alkyl adducts. DNA-directed synthesis in the presence of ultimate carcinogens provides for an estimation of misincorporations, which implicate the same transversions as those found by direct mutagenicity testing. Chemical carcinogens recognize tissue-sensitive cells and modify their heritable genetic complement. Oncoproteins encoded by activated oncogenes signal the transformation of normal cells into cancer cells. The importance of the H-ras oncogene and p53 tumour-suppressor gene is stressed. Antidotal action is analysed; for example, parenteral glutamine administration to telodrin-intoxicated rats restores the depleted cerebral glutamate level and prevents seizures. Glutamate acts as anticonvulsant in petit mal epilepsy. In general, therefore, the reaction of the toxicant-related substance with the relevant target-tissue macromolecule accounts for the biochemical/biological events at a cellular level a PMID

  1. Determination and confirmation of parent and total ractopamine in bovine, swine, and turkey tissues by liquid chromatography with tandem mass spectrometry: Final Action 2011.23.

    PubMed

    Ulrey, W Dennis; Burnett, Thomas J; Brunelle, Sharon L; Lombardi, Kimberly R; Coleman, Mark R

    2013-01-01

    A multilaboratory study of AOAC Official Method 2011.23 was performed to satisfy requirements for Final Action status through the AOAC expert review panel process. The study included nine collaborating laboratories from the United States, Canada, Brazil, and The Netherlands. Five incurred residue materials (bovine muscle, bovine liver, swine muscle, swine liver, and turkey muscle) were analyzed by each laboratory as blind duplicates for parent and total ractopamine content. After removal of invalid data, the parent and total ractopamine methods demonstrated acceptable reproducibility (RSDR 11.4-42.4%, HorRatR 0.34-2.01) based on AOAC criteria. The method was awarded Final Action status by the Official Methods Board on October 4, 2012. PMID:24000769

  2. Affirmative Action, or Reverse Discrimination?

    ERIC Educational Resources Information Center

    Dansby, Ike

    1996-01-01

    Determines the impact of affirmative action programs in response to charges that they are policies of reverse discrimination. Reviewing affirmative action programs submitted by Michigan State departments, researchers determined no reverse discrimination was apparent based on low numbers of reverse discrimination complaints filed by whites. (GR)

  3. Action Research Empowers School Librarians

    ERIC Educational Resources Information Center

    Robins, Jennifer

    2015-01-01

    Successful school library programs occur through careful planning and reflection. This reflective process is improved when it is applied in a systematic way through action research. The action research described in this paper enabled school librarians to reflect based on evidence, using data they had collected. This study presents examples of the…

  4. Action Research: Theory and Applications

    ERIC Educational Resources Information Center

    Jefferson, Renée N.

    2014-01-01

    Action research as a methodology is suitable for use within academic library settings. Its theoretical foundations are located in several disciplines and its applications span across many professions. In this article, an overview of the theoretical beginnings and evolution of action research is presented. Approaches generally used in conducting an…

  5. Automatic Imitation of Intransitive Actions

    ERIC Educational Resources Information Center

    Press, Clare; Bird, Geoffrey; Walsh, Eamonn; Heyes, Cecilia

    2008-01-01

    Previous research has indicated a potential discontinuity between monkey and human ventral premotor-parietal mirror systems, namely that monkey mirror systems process only transitive (object-directed) actions, whereas human mirror systems may also process intransitive (non-object-directed) actions. The present study investigated this discontinuity…

  6. Community Action for Environmental Quality.

    ERIC Educational Resources Information Center

    Citizens Advisory Committee on Environmental Quality.

    For citizens who want to participate in practical action to make their communities better places for living, this guide considers numerous approaches for community involvement. It stresses not only comprehensive planning but also the importance of getting action started. A rough order of business is suggested. First, considered are the various…

  7. Technology assessment and citizen action

    NASA Technical Reports Server (NTRS)

    Mottur, E. R.

    1975-01-01

    Citizen participation in the nation's total social, political, economic decisionmaking processes was studied. Impediments are discussed which prevent citizens from taking effective assessment action; these include finance, organization and motivation, and information. The proposal for establishing citizens assessment associations is considered along with implications of citizen assessment action.

  8. Action Research and Teacher Leadership

    ERIC Educational Resources Information Center

    Smeets, Karel; Ponte, Petra

    2009-01-01

    The present article reports on a case study into the influence and impact of action research carried out by teachers in a special school. The action research was an important component of the two-year, post-initial, in-service course in special educational needs, provided by Fontys University of Applied Sciences, Department of Inclusive and…

  9. Thought and Action in Education

    ERIC Educational Resources Information Center

    Rømer, Thomas Aastrup

    2015-01-01

    In much theory there is a tendency to place thought above action, or the opposite, action over thought. The consequence of the first option is that philosophy or scientific evidence gains the upper hand in educational thinking. The consequence of the second view is that pragmatism and relativism become the dominant features. This article discusses…

  10. Action Learning in the BBC

    ERIC Educational Resources Information Center

    Felix, Eversley; Keevill, Joan

    2008-01-01

    This account tells the story of the development of an action learning culture in the BBC between 2002 and 2007. From its early beginnings as a sporadic, unsystematic intervention with a small number of leaders scattered throughout the organisation, action learning has now become embedded in our approach to the way we develop our leaders. In this…

  11. Integrating CHAT and Action Research

    ERIC Educational Resources Information Center

    Wells, Gordon

    2011-01-01

    The question as to how action research (AR) is related to cultural-historical activity theory (CHAT) is not answerable in categorical terms. Both CHAT and AR have been variously interpreted and much depends on the individual biographies of those who pronounce on their relationship. The aim of this paper is to show how action research, conducted…

  12. Mode of Action of Glyphosate

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Although glyphosate is the most used and studied herbicide in the world, the available information is not enough to fully understand its mode of action. The molecular site of action of glyphosate is the enzyme 5-enolpyruvlyshikimate-3-phosphate synthase (EPSPS). It is the only known compound that ...

  13. Action Understanding as Inverse Planning

    ERIC Educational Resources Information Center

    Baker, Chris L.; Saxe, Rebecca; Tenenbaum, Joshua B.

    2009-01-01

    Humans are adept at inferring the mental states underlying other agents' actions, such as goals, beliefs, desires, emotions and other thoughts. We propose a computational framework based on Bayesian inverse planning for modeling human action understanding. The framework represents an intuitive theory of intentional agents' behavior based on the…

  14. Philosophy, Methodology and Action Research

    ERIC Educational Resources Information Center

    Carr, Wilfred

    2006-01-01

    The aim of this paper is to examine the role of methodology in action research. It begins by showing how, as a form of inquiry concerned with the development of practice, action research is nothing other than a modern 20th century manifestation of the pre-modern tradition of practical philosophy. It then draws in Gadamer's powerful vindication of…

  15. Taking Action with Teacher Research.

    ERIC Educational Resources Information Center

    Meyers, Ellen; Rust, Frances O'Connell

    This collection of papers presents examples of teacher research in action. Each study grew out of teachers' questions regarding the implementation of some aspect of education policy in their schools and classrooms. After "Introduction" (Frances O'Connell Rust and Ellen Meyers), the eight papers focus on: (1) "How We Do Action Research" (Frances…

  16. 29 CFR 37.80 - What happens if a recipient fails to issue a Notice of Final Action within 90 days of the date on...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true What happens if a recipient fails to issue a Notice of Final Action within 90 days of the date on which a complaint was filed? 37.80 Section 37.80 Labor Office of the Secretary of Labor IMPLEMENTATION OF THE NONDISCRIMINATION AND EQUAL OPPORTUNITY PROVISIONS OF THE WORKFORCE INVESTMENT ACT OF 1998...

  17. 29 CFR 37.79 - If, before the 90-day period has expired, a recipient issues a Notice of Final Action with which...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true If, before the 90-day period has expired, a recipient issues a Notice of Final Action with which the complainant is dissatisfied, how long does the complainant have to file a complaint with the Director? 37.79 Section 37.79 Labor Office of the Secretary of Labor IMPLEMENTATION OF THE NONDISCRIMINATION...

  18. Proposed plan/Statement of basis for the Grace Road Site (631-22G) operable unit: Final action

    SciTech Connect

    Palmer, E.

    1997-08-19

    This Statement of Basis/Proposed Plan is being issued by the U. S. Department of Energy (DOE), which functions as the lead agency for the Savannah River Site (SRS) remedial activities, with concurrence by the U. S. Environmental Protection Agency (EPA), and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this Statement of Basis/Proposed Plan is to describe the preferred alternative for addressing the Grace Road site (GRS) located at the Savannah River Site (SRS), in Aiken, South Carolina and to provide an opportunity for public input into the remedial action selection process.

  19. Superfund Record of Decision (EPA Region 7): Fulbright/Sac River Landfill, Missouri (first remedial action), September 1988. Final report

    SciTech Connect

    Not Available

    1988-09-30

    The Fulbright and Sac River Landfills are located just north of the City of Springfield, Missouri, in a semirural area. The landfills were operated by the city for the disposal of municipal and industrial solid wastes. The site, however, could endanger human health or the environment in the future through exposure of the industrial wastes through erosion of the landfill cover. The selected remedial action for this site includes: removal of the drum and drum remnants found in the sinkhole and associated trench east of the Fulbright Landfill; sampling the removed contents to determine hazardous characteristics; proper offsite treatment or disposal.

  20. Superfund Record of Decision (EPA Region 3): Voortman Farm Site, Lehigh County, Pennsylvania (first remedial action) June 1988. Final report

    SciTech Connect

    Not Available

    1988-06-30

    The 43-acre Voortman Farm site is located in Upper Salucon Township, Lehigh County, Pennsylvania. The site consists of a sinkhole that contained empty battery casings disposed of in late 1979 and early 1980. Citizen complaints in 1980 prompted the prohibition of dumping and subsequent site investigation. In September 1986, the battery casings in the sinkhole caught on fire. Since the battery casings were burning underground, attempts to extinguish the fire remained unsuccessful. There does not appear to be any leaching from any residual metals, contaminated soils or battery casings present. The selected remedial action for the site is included.

  1. Conscious vision for action versus unconscious vision for action?

    PubMed

    Brogaard, Berit

    2011-08-01

    David Milner and Melvyn Goodale's dissociation hypothesis is commonly taken to state that there are two functionally specialized cortical streams of visual processing originating in striate (V1) cortex: a dorsal, action-related "unconscious" stream and a ventral, perception-related "conscious" stream. As Milner and Goodale acknowledge, findings from blindsight studies suggest a more sophisticated picture that replaces the distinction between unconscious vision for action and conscious vision for perception with a tripartite division between unconscious vision for action, conscious vision for perception, and unconscious vision for perception. The combination excluded by the tripartite division is the possibility of conscious vision for action. But are there good grounds for concluding that there is no conscious vision for action? There is now overwhelming evidence that illusions and perceived size can have a significant effect on action (Bruno & Franz, 2009; Dassonville & Bala, 2004; Franz & Gegenfurtner, 2008; McIntosh & Lashley, 2008). There is also suggestive evidence that any sophisticated visual behavior requires collaboration between the two visual streams at every stage of the process (Schenk & McIntosh, 2010). I nonetheless want to make a case for the tripartite division between unconscious vision for action, conscious vision for perception, and unconscious vision for perception. My aim here is not to refute the evidence showing that conscious vision can affect action but rather to argue (a) that we cannot gain cognitive access to action-guiding dorsal stream representations, and (b) that these representations do not correlate with phenomenal consciousness. This vindicates the semi-conservative view that the dissociation hypothesis is best understood as a tripartite division. PMID:21790744

  2. Effects of Security actions

    NASA Astrophysics Data System (ADS)

    Bergman, Ramona; Andersson-Sköld, Yvonne; Nyberg, Lars; Johansson, Magnus

    2010-05-01

    In a project funded by the Swedish Civil Contingencies Agency, the effort and work to reduce different kinds of accidents are being evaluated. The project wants to illuminate the links between actions and outcome, so we can learn from today's performance and in the future select more effective measures and overall deal with accidents more efficiently. The project ESS covers the field of frequent accidents such as sliding accidents at home, in house fires and less common accidents such as chemical and land fill accidents up to even more rare accidents such as natural accidents and hazards. In the ESS project SGI (Swedish geotechnical institute) will evaluate the work and effort concerning various natural hazards limited to landslides, erosion and flooding. The aim is to investigate how municipalities handle, especially prevention, of such natural disasters today. The project includes several aspects such as: • which are the driving forces for risk analysis in a municipality • do one use risk mapping (and what type) in municipal risk analysis • which aspects are most important when selecting preventive measures • in which way do one learn from past accidents • and from previous accidents elsewhere, by for example use existing databases • etc There are many aspects that play a role in a well-functioning safety promotion work. The overall goal is to examine present work and activities, highlight what is well functioning and identify weak points. The aim is to find out where more resources are needed and give suggestions for a more efficient security work. This includes identification of the most efficient "tools" in use or needed. Such tools can be education, directives, funding, more easily available maps and information regarding previous accidents and preventive measures etc. The project will result in recommendations for more effective ways to deal with landslides, erosion and flooding. Since different kinds of problems can occur depending on level of

  3. Decision Making in Action

    NASA Technical Reports Server (NTRS)

    Orasanu, Judith; Statler, Irving C. (Technical Monitor)

    1994-01-01

    contributes to performance because it assures that all crew members have essential information, but it also regulates and coordinates crew actions and is the medium of collective thinking in response to a problem. This presentation will examine the relations between leadership, communication, decision making and overall crew performance. Implications of these findings for spaceflight and training for offshore installations will be discussed.

  4. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    SciTech Connect

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  5. Superfund Record of Decision (EPA Region 1): Cannon Engineering, MA. (First Remedial Action), March 1988. Final report

    SciTech Connect

    Not Available

    1988-03-31

    The Cannon Engineering Corporation (CEC) facility is located in a small industrial park in the western part of the Town of Bridgewater, Plymouth County, Massachusetts. CEC, which has owned the property since 1974, handled, stored, and incinerated chemical waste onsite from 1974 to 1980. EPA conducted site investigations between 1980 and 1982, and in October 1982, Massachusetts contracted for the removal of sludge and liquid waste from onsite tanks and drums. In January 1988, EPA provided for the removal and disposal of numerous hazardous materials abandoned at the site. This remedial action addresses three discrete areas of soil and sediment contamination. The primary contaminants of concern affecting the ground water, soil, and debris are VOCs including benzene, TCE, and vinyl chloride, and other organics including PCBs and PAHs. The selected remedial action includes: excavation and onsite treatment of VOC-contaminated soil by thermal aeration, and excavation and offsite treatment of PCB-contaminated soil by incineration; decontamination, removal, and disposal of contaminated buildings, tanks, and structures; additional soil sampling; ground water monitoring.

  6. Superfund Record of Decision (EPA Region 5): Hedblum Industries, MI. (First remedial action), September 1989. Final report

    SciTech Connect

    Not Available

    1989-09-29

    Hedblum Industries site, an automotive parts manufacturing plant, is approximately one mile southwest of the town of Oscoda, in AuSable Township, Iosco County, Michigan. Ground water flows beneath the plant and subdivision and discharges via a bayou into the AuSable River. Between 1968 and 1972 the previous plant operators discharged cooling water, rinse water, and approximately 4,000 gallons of waste TCE onto the ground. In 1973 VOCs were detected in residential wells in the AuSable subdivision. Contaminated wells were replaced with deeper wells which by 1977 also showed traces of contamination. Subsequently, the Oscoda Township Municipal Supply System was extended to residents through the installation of a new water main. An underground storage tank containing TCE, TCA, and PCE was removed from the site in 1980. The primary contaminants of concern affecting the ground water are VOCs including benzene, toluene, xylenes, TCE, and PCE; and metals including lead. The selected remedial action for the site includes ground water pumping and treatment using activated carbon adsorption with discharge to the bayou; and ground water and soil monitoring. The estimated present worth cost of the remedial action is $2,379,000, which includes an annual O M cost of $264,000 over 4-5 years.

  7. [Biological actions of acetaldehyde].

    PubMed

    Ijiri, I

    1999-11-01

    Acetaldehyde (AcH), the first metabolite of ethanol (EtOH), is a chemically reactive and pharmacologically active compound. The author has been engaged in the study of AcH in cooperation with many researchers for three decades. We have found many biological actions of AcH which cause cardiovascular symptoms after drinking and also inhibited EtOH absorption via the canine and rat intestinal tract. This report covers the following five points. 1. The subjects were classified into a non-flushing group and a flushing group, according to the degree of facial flushing after drinking 200 ml of Sake (Japanese rice wire) at a rate of 100 ml per 5 min. Blood EtOH profile was much the same in both groups, yet peak blood AcH concentration in the flushing group was significantly higher than that in the non-flushing group. All subjects in the flushing group showed marked flushing and an increase in pulse rate after drinking, but these symptoms were not apparent in the non-flushing group. These results suggested that cardiovascular symptoms were caused by AcH itself. 2. Urinary excretions of both norepinephrine and epinephrine increased in the flushing cases after drinking Sake in comparison with those who drank the same volume of water. However, these catecholamines did not change in the non-flushing group. These results suggested that it is catecholamines released from the sympathetic nerve end or the adrenal medulla by AcH which caused an increase in pulse rate. 3. Bradykinin is released from high molecular kininogen by activated kallikrein and acts to dilate distal blood vessels and raise permeability in tissues. On the other hand, kallidin is released from low molecular kininogen by activated glandular kallikrein and its action is weaker than that of bradykinin. Blood low molecular kininogen levels in the flushing group decreased gradually after drinking and were mutually related to the blood AcH concentrations. But levels in the non-flushing group showed no difference

  8. Final Characterization Report for Corrective Action Unit 109: Area 2 U-2BU Crater, Nevada Test Site, Nevada, Revision 1

    SciTech Connect

    ITLV

    1998-12-01

    Corrective Action Unit 109, Area 2 U-2bu Crater, is an inactive Resource Conservation and Recovery Act Part A Permit disposal unit located in Area 2 at the Nevada Test Site, Nevada. The Corrective Action Unit has been characterized under the requirements of the Nevada Test Site Resource Conservation and Recovery Act, Part A Permit (NDEP, 1995) and Title 40 Code of Federal Regulations Part 265 (CFR, 1996). The site characterization was performed under the RCRA Part A Permit Characterization Plan for the U-2bu Subsidence Crater (DOE/NV, 1998c), as approved by the Nevada Division of Environmental Protection (Liebendorfer, 1998). The primary objective of the site characterization activities was to evaluate the presence, concentration, and extent of any Resource Conservation and Recovery Act contaminants in the crater. Surface soil samples were collected on April 22, 1998, and subsurface soil samples and geotechnical samples were collected from April 27-29, 1998. Soil samples were collected using a hand auger or a piston-type drive hammer to advance a 5-centimeter (2-inch) diameter steel sampling tool into the ground. The permit for the Nevada Test Site requires that Corrective Action Unit 109 be closed under 40 Code of Federal Regulations 265 Subpart G and 40 Code of Federal Regulations Part 265.310 (CFR, 1996). Analysis of the data collected during the characterization effort indicates that lead was detected in Study Area 1 at 5.7 milligrams per liter, above the regulatory level in 40 Code of Federal Regulations 261.24 of 5.0 milligrams per liter. Except for the lead detection at a single location within the crater, the original Resource Conservation Recovery Act constituents of potential concern determined between the U.S. Department of Energy, Nevada Operations Office and the Nevada Department of Environmental Protection during the Data Quality Objectives process (DOE/NV, 1998b) were not found to be present at Corrective Action Unit 109 above regulatory levels of

  9. "Wuwei" (Non-Action) Philosophy and Actions: Rethinking "Actions" in School Reform

    ERIC Educational Resources Information Center

    Moon, Seungho

    2015-01-01

    This inquiry aims to enrich conversation regarding school reform. The author asks about what other discourses are possible when the action-oriented question of how to "act" is a major approach to "fix" current educational problems. Drawing from Taoist philosophy of "wuwei" (non-action), the author provides a frame to…

  10. Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1996--June 1996

    SciTech Connect

    1996-08-01

    This document summarizes significant enforcement actions that have been resolved during the period of January-June 1996. The report includes copies of Orders and Notices of Violations sent by the Nuclear Regulatory Commission to individuals with respect to the enforcement actions.

  11. American Samoa Energy Action Plan

    SciTech Connect

    Haase, Scott; Esterly, Sean; Herdrich, David; Bodell, Tim; Visser, Charles

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  12. Do good actions inspire good actions in others?

    PubMed Central

    Capraro, Valerio; Marcelletti, Alessandra

    2014-01-01

    Actions such as sharing food and cooperating to reach a common goal have played a fundamental role in the evolution of human societies. Despite the importance of such good actions, little is known about if and how they can spread from person to person to person. For instance, does being recipient of an altruistic act increase your probability of being cooperative with a third party? We have conducted an experiment on Amazon Mechanical Turk to test this mechanism using economic games. We have measured willingness to be cooperative through a standard Prisoner's dilemma and willingness to act altruistically using a binary Dictator game. In the baseline treatments, the endowments needed to play were given by the experimenters, as usual; in the control treatments, they came from a good action made by someone else. Across four different comparisons and a total of 572 subjects, we have never found a significant increase of cooperation or altruism when the endowment came from a good action. We conclude that good actions do not necessarily inspire good actions in others. While this is consistent with the theoretical prediction, it challenges the majority of other experimental studies. PMID:25502617

  13. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    SciTech Connect

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings, and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.

  14. Superfund Record of Decision (EPA Region 5): Miami County Incinerator, OH. (First Remedial Action), June 1989. Final report

    SciTech Connect

    Not Available

    1989-06-30

    The Miami County Incinerator site is in Concord Township, Ohio. The site consists of the incinerator building and adjacent property, including a former scrubber waste water lagoon, an ash-disposal pit, an ash pile, a liquid-disposal area, and trench and fill landfill areas north and south of the Eldean Tributary. Operations began in 1968, when large quantities of spent solvents, soils, and drummed and bulk industrial sludges were accepted for disposal. After closure of the facility in 1983, the Ohio EPA found detectable levels of chlorinated hydrocarbons in drinking water wells near the site. The primary contaminants of concern affecting the soil and ground water are VOCs including PCE, toluene, and TCE; other organics including PCBs, PAHs, dioxin, and pesticides; and metals including lead. The selected remedial actions for the site are included.

  15. Multi-Scale Action Effectiveness Research in the Lower Columbia River and Estuary, 2011 - FINAL ANNUAL REPORT

    SciTech Connect

    Sather, Nichole K.; Storch, Adam; Johnson, Gary E.; Teel, D. J.; Skalski, J. R.; Bryson, Amanda J.; Kaufmann, Ronald M.; Woodruff, Dana L.; Blaine, Jennifer; Kuligowski, D. R.; Kropp, Roy K.; Dawley, Earl M.

    2012-05-31

    The study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL), the Oregon Department of Fish and Wildlife (ODFW), the University of Washington (UW), and the National Marine Fisheries Service (NMFS) for the U.S. Army Corps of Engineers, Portland District (USACE). This research project was initiated in 2007 by the Bonneville Power Administration to investigate critical uncertainties regarding juvenile salmon ecology in shallow tidal freshwater habitats of the lower Columbia River. However, as part of the Washington Memorandum of Agreement, the project was transferred to the USACE in 2010. In transferring from BPA to the USACE, the focus of the tidal freshwater research project shifted from fundamental ecology toward the effectiveness of restoration in the Lower Columbia River and estuary (LCRE). The research is conducted within the Action Agencies Columbia Estuary Ecosystem Restoration Program (CEERP). Data reported herein spans the time period May 2010 to September 2011.

  16. Superfund Record of Decision (EPA Region 5): FMC Corporation, Fridley, Minnesota (second remedial action), September 1987. Final report

    SciTech Connect

    Not Available

    1987-09-30

    The FMC site, in the City of Fridley, Minnesota is approximately 1,000 feet east of the Mississippi River, just north of the City of Minneapolis, and upstream of the City of Minneapolis drinking-water intake. Investigation revealed historical waste-disposal practices and found contamination of the ground water and Mississippi River. Currently underlying ground water and alluvial aquifers with discharge to the Mississippi River are contaminated with trichloroethene (TCE), Porchloroethylene (PCE), benzene, toluene, xylene, and other volatile organic compounds (VOCs). TCE has been estimated to account for 98% of the contaminant loading. The selected remedial action for the site includes: ground-water pump and treatment with discharge to a sewer system; ground-water monitoring; and implementation of institutional controls with land-use restrictions to mitigate against near-term usage of contaminated ground water between the site and the Mississippi River.

  17. Superfund Record of Decision (EPA Region 5): Republic Steel Quarry Site, Elyria, Ohio (first remedial action), September 1988. Final report

    SciTech Connect

    Not Available

    1988-09-30

    The Republic Steel Quarry site is located in the City of Elyria in Lorain County, Ohio, southwest of Cleveland. From 1950 to 1972, approximately 200,000 gallons of waste pickle liquor (acid wastes used in steel processing) were discharged to a ditch located on the east side of the steel plant, which flowed north into the quarry. From 1972 to 1975 the ditch was used for disposing of rinse water from pickling operations. The primary contaminants of concern affecting surface water, sediments, and soil are VOCs including toluene, and metals including chromium and lead. The selected remedial action for this site includes: excavation and offsite disposal an a RCRA landfill of approximately 100 cu yds of contaminated surface soil from the pickle-liquor discharge ditch and from along the southern end of the quarry; and implementation of a five-year monitoring plan including a fish-species survey.

  18. Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume I

    SciTech Connect

    Not Available

    1983-07-01

    The environmental impacts associated with remedial actions in connection with residual radioactive materials remaining at the inactive uranium processing site located in Canonsburg, Washington County, Pennsylvania are evaluated. The Canonsburg site is an 18.5-acre property that was formerly owned by the Vitro Rare Metals Company. The expanded Canonsburg site would be 30-acre property that would include the Canonsburg site (the former Vitro Rare Metals plant), seven adjacent private houses, and the former Georges Pottery property. During the period 1942 through 1957 the Vitro Manufacturing Company and its successor, the Vitro Corporation of America, processed onsite residues and ores, and government-owned ores, concentrates, and scraps to extract uranium and other rare metals. The Canonsburg site is now the Canon Industrial Park. In addition to storing the residual radioactive materials of this process at the Canonsburg site, about 12,000 tons of radioactively contaminated materials were transferred to a railroad landfill in Burrell Township, Indiana County, Pennsylvania. This Canonsburg FEIS evaluates five alternatives for removing the potential public health hazard associated with the radioactively contaminated materials. In addition to no action, these alternatives involve various combinations of stabilization of the radioactively contaminated materials in place or decontamination of the Canonsburg and Burrell sites by removing the radioactively contaminated materials to another location. In addition to the two sites mentioned, a third site located in Hanover Township, Washington County, Pennsylvania has been considered as a disposal site to which the radioactively contaminated materials presently located at either of the other two sites might be moved.

  19. Superfund Record of Decision (EPA Region 3): Raymark Site, operable unit 1, Montgomery County, PA. (First remedial action), December 1991. Final report

    SciTech Connect

    Not Available

    1991-12-30

    The 7-acre Raymark site is an active metal manufacturing and electroplating plant in the Borough of Hatboro, Montgomery County, Pennsylvania. The site, located in an industrial area, is approximately 100 feet from the nearest residence. The nearest surface water is Pennypack Creek, which flows 4,000 feet southwest of the site. As part of the rivet manufacturing processes at the plant, VOCs, including 30 to 40 gallons of TCE, were used daily at the site to clean and degrease metal parts. The ROD addresses the soil/source of contamination as the final action at the site and is referred to as OU1. The drinking water and risks posed by groundwater (OU2 and OU3, respectively) were addressed in a previous 1990 ROD. The primary contaminants of concern affecting the soil/source are VOCs, including 1,2-DCE, PCE, and TCE. The selected remedial action for the site is included.

  20. Eicosanoid actions in insect immunology

    Technology Transfer Automated Retrieval System (TEKTRAN)

    In this chapter we review eicosanoid actions in insect immunity. Eicosanoids are oxygenated metabolites of arachidonic acid (AA) and two other C20 polyunsaturated polyunsaturated fatty acids. Groups of eicosanoids include prostaglandins, lipoxygenase products and epoxyeicosatrienoic acids. These ...

  1. Technology assessment and citizen action

    NASA Technical Reports Server (NTRS)

    Mottur, E. R.

    1972-01-01

    The importance of citizen participation in the assessment process is discussed, and a system for citizen assessment action is proposed. A national assessment system is outlined. Citizen participation is considered essential in the assessment process, and impediments to effective action taken by citizens are discussed. These impediments are finance, organization and motivation, and information. The establishment of citizens' assessment associations is proposed, whose functioning would be fostered and regulated by the Citizens' Assessment Administration. The organization, functions, and financing of these associations are described. The implications of citizen action are indicated as the extensive use of class action suits, the broad interpretation of associated costs of litigation, and the use of present scientific research as evidence to assert that it is reasonable to conclude that certain consequences are probable to occur in the future.

  2. InterAction Database (IADB)

    Cancer.gov

    The InterAction Database includes demographic and prescription information for more than 500,000 patients in the northern and middle Netherlands and has been integrated with other systems to enhance data collection and analysis.

  3. ICDF Complex Remedial Action Report

    SciTech Connect

    W. M. Heileson

    2007-09-26

    This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

  4. What's an Asthma Action Plan?

    MedlinePlus

    ... KidsHealth in the Classroom What Other Parents Are Reading Upsetting News Reports? What to Say Vaccines: Which ... flow meters. Action plans use symptoms, peak flow readings, or both to help you determine the zone ...

  5. The Concept of Action Research.

    ERIC Educational Resources Information Center

    Altrichter, Herbert; Kemmis, Stephen; McTaggart, Robin; Zuber-Skerritt, Ortrun

    2002-01-01

    Explains why definition of action research is problematic and presents working definitions developed internationally that indicate its nature, philosophy, and methodology. Suggests that pragmatic approaches to definition serve communication purposes without narrowly confining the concept. (SK)

  6. REMEDIAL ACTION COSTING PROCEDURES MANUAL

    EPA Science Inventory

    The manual provides specific procedures for the cost estimating and economic analysis steps required for preparing engineering cost estimates for selecting remedial action alternatives in response to the requirements of the Comprehensive Environmental Response, Compensation, and ...

  7. Method for triggering an action

    DOEpatents

    Hall, David R.; Bartholomew, David B.; Johnson, Monte L.; Moon, Justin; Koehler, Roger O.

    2006-10-17

    A method for triggering an action of at least one downhole device on a downhole network integrated into a downhole tool string synchronized to an event comprises determining latency, sending a latency adjusted signal, and performing the action. The latency is determined between a control device and the at least one downhole device. The latency adjusted signal for triggering an action is sent to the downhole device. The action is performed downhole synchronized to the event. A preferred method for determining latency comprises the steps: a control device sends a first signal to the downhole device; after receiving the signal, the downhole device sends a response signal to the control device; and the control device analyzes the time from sending the signal to receiving the response signal.

  8. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  9. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  10. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  11. Seeking Conceptual Clarity in the Action Modalities

    ERIC Educational Resources Information Center

    Raelin, Joe

    2009-01-01

    This article begins with the presumption that action learning has not made as deep an impact in promoting participatory social change as its supporters may have hoped for, but nor has its cousin action modalities, such as action research and action science. These action strategies have evolved separately along distinct traditions and, rather than…

  12. 12 CFR 272.4 - Committee actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Committee actions. 272.4 Section 272.4 Banks....4 Committee actions. (a) Actions at meetings. Actions are taken at meetings of the Committee except as described below. (b) Actions between meetings. Special circumstances may make it desirable in...

  13. 45 CFR 1225.19 - Corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Corrective action. 1225.19 Section 1225.19 Public... Corrective action. (a) When discrimination is found, Peace Corps or ACTION must take appropriate action to... corrective action to the agent and other class members in accordance with § 1225.10 of this part. (b)...

  14. Segmenting Dynamic Human Action via Statistical Structure

    ERIC Educational Resources Information Center

    Baldwin, Dare; Andersson, Annika; Saffran, Jenny; Meyer, Meredith

    2008-01-01

    Human social, cognitive, and linguistic functioning depends on skills for rapidly processing action. Identifying distinct acts within the dynamic motion flow is one basic component of action processing; for example, skill at segmenting action is foundational to action categorization, verb learning, and comprehension of novel action sequences. Yet…

  15. Incongruent Imagery Interferes with Action Initiation

    ERIC Educational Resources Information Center

    Ramsey, Richard; Cumming, Jennifer; Eastough, Daniel; Edwards, Martin G.

    2010-01-01

    It has been suggested that representing an action through observation and imagery share neural processes with action execution. In support of this view, motor-priming research has shown that observing an action can influence action initiation. However, there is little motor-priming research showing that imagining an action can modulate action…

  16. 12 CFR 272.4 - Committee actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 3 2011-01-01 2011-01-01 false Committee actions. 272.4 Section 272.4 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) FEDERAL OPEN MARKET COMMITTEE RULES OF PROCEDURE § 272.4 Committee actions. (a) Actions at meetings. Actions are taken at meetings of the Committee except as described below. (b) Actions between...

  17. Complexity, action, and black holes

    DOE PAGESBeta

    Brown, Adam R.; Roberts, Daniel A.; Susskind, Leonard; Swingle, Brian; Zhao, Ying

    2016-04-18

    In an earlier paper "Complexity Equals Action" we conjectured that the quantum computational complexity of a holographic state is given by the classical action of a region in the bulk (the `Wheeler-DeWitt' patch). We provide calculations for the results quoted in that paper, explain how it fits into a broader (tensor) network of ideas, and elaborate on the hypothesis that black holes are the fastest computers in nature.

  18. Complexity, action, and black holes

    NASA Astrophysics Data System (ADS)

    Brown, Adam R.; Roberts, Daniel A.; Susskind, Leonard; Swingle, Brian; Zhao, Ying

    2016-04-01

    Our earlier paper "Complexity Equals Action" conjectured that the quantum computational complexity of a holographic state is given by the classical action of a region in the bulk (the "Wheeler-DeWitt" patch). We provide calculations for the results quoted in that paper, explain how it fits into a broader (tensor) network of ideas, and elaborate on the hypothesis that black holes are the fastest computers in nature.

  19. Tactile perception during action observation.

    PubMed

    Vastano, Roberta; Inuggi, Alberto; Vargas, Claudia D; Baud-Bovy, Gabriel; Jacono, Marco; Pozzo, Thierry

    2016-09-01

    It has been suggested that tactile perception becomes less acute during movement to optimize motor control and to prevent an overload of afferent information generated during action. This empirical phenomenon, known as "tactile gating effect," has been associated with mechanisms of sensory feedback prediction. However, less attention has been given to the tactile attenuation effect during the observation of an action. The aim of this study was to investigate whether and how the observation of a goal-directed action influences tactile perception as during overt action. In a first experiment, we recorded vocal reaction times (RTs) of participants to tactile stimulations during the observation of a reach-to-grasp action. The stimulations were delivered on different body parts that could be either congruent or incongruent with the observed effector (the right hand and the right leg, respectively). The tactile stimulation was contrasted with a no body-related stimulation (an auditory beep). We found increased RTs for tactile congruent stimuli compared to both tactile incongruent and auditory stimuli. This effect was reported only during the observation of the reaching phase, whereas RTs were not modulated during the grasping phase. A tactile two-alternative forced-choice (2AFC) discrimination task was then conducted in order to quantify the changes in tactile sensitivity during the observation of the same goal-directed actions. In agreement with the first experiment, the tactile perceived intensity was reduced only during the reaching phase. These results suggest that tactile processing during action observation relies on a process similar to that occurring during action execution. PMID:27161552

  20. TACT: The Action Computation Tool

    NASA Astrophysics Data System (ADS)

    Sanders, Jason L.; Binney, James

    2015-12-01

    The Action Computation Tool (TACT) tests methods for estimating actions, angles and frequencies of orbits in both axisymmetric and triaxial potentials, including general spherical potentials, analytic potentials (Isochrone and Harmonic oscillator), axisymmetric Stackel fudge, average generating function from orbit (AvGF), and others. It is written in C++; code is provided to compile the routines into a Python library. TM (ascl:1512.014) and LAPACK are required to access some features.