Science.gov

Sample records for action final action

  1. 37 CFR 2.64 - Final action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Final action. (a) On the first or any subsequent reexamination or reconsideration the refusal of the... months after the date of the final action. The Office will enter amendments accompanying requests for reconsideration after final action if the amendments comply with the rules of practice in trademark cases and...

  2. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Final action. 92.17 Section 92.17 Money and Finance: Treasury Regulations Relating to Money and Finance UNITED STATES MINT OPERATIONS AND... States Mint § 92.17 Final action. (a) In making a final determination whether to impose a penalty,...

  3. Action Sheet 36 Final Report

    SciTech Connect

    Kips, R E; Kristo, M J; Hutcheon, I D

    2012-02-24

    Pursuant to the Arrangement between the European Commission DG Joint Research Centre (EC-JRC) and the Department of Energy (DOE) to continue cooperation on research, development, testing, and evaluation of technology, equipment, and procedures in order to improve nuclear material control, accountancy, verification, physical protection, and advanced containment and surveillance technologies for international safeguards, dated 1 September 2008, the IRMM and LLNL established cooperation in a program on the Study of Chemical Changes in Uranium Oxyfluoride Particles under IRMM-LLNL Action Sheet 36. The work under this action sheet had 2 objectives: (1) Achieve a better understanding of the loss of fluorine in UO{sub 2}F{sub 2} particles after exposure to certain environmental conditions; and (2) Provide feedback to the EC-JRC on sample reproducibility and characteristics.

  4. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... THE TREASURY UNITED STATES MINT OPERATIONS AND PROCEDURES Assessment of Civil Penalties for Misuse of Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making...

  5. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... THE TREASURY UNITED STATES MINT OPERATIONS AND PROCEDURES Assessment of Civil Penalties for Misuse of Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making...

  6. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... THE TREASURY UNITED STATES MINT OPERATIONS AND PROCEDURES Assessment of Civil Penalties for Misuse of Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making...

  7. 31 CFR 92.17 - Final action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... THE TREASURY UNITED STATES MINT OPERATIONS AND PROCEDURES Assessment of Civil Penalties for Misuse of Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making...

  8. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If...

  9. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If...

  10. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If...

  11. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If...

  12. 29 CFR 1990.147 - Final action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If...

  13. Final Action Plan to Tiger Team

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  14. Final Federal Radon Action Plan Scorecard

    EPA Pesticide Factsheets

    This page provides information and a link to the draft Federal Radon Action Plan. It also contains a Federal Radon Action Plan Scorecard, a tool designed to display the current status of each federal agency commitments and outcomes to date.

  15. Final Natural Resource Actions Environmental Assessment

    DTIC Science & Technology

    2005-06-22

    f/J-1 o) JO L S. REESE, Colonel, USAF 319 ARW/CV, Chairman, Environmental Protection Committee ROD /051260006 (CLR2912.00C) 2 Architect...Safety and Occupational Health Proposed Action By following proper herbicide application procedures and construction techniques, the Proposed Action... construction season. 2.4.1.3 Prairie View Nature Preserve Management Guide The PVNP Management Guide (Grand Forks AFB, undated) was developed to ensure

  16. 22 CFR 1471.10 - Final action by the Panel.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Final action by the Panel. 1471.10 Section 1471...; GENERAL COUNSEL OF THE FEDERAL LABOR RELATIONS AUTHORITY; AND THE FOREIGN SERVICE IMPASSE DISPUTES PANEL FOREIGN SERVICE IMPASSE DISPUTES PANEL PROCEDURES OF THE PANEL § 1471.10 Final action by the Panel. (a)...

  17. 5 CFR 2472.11 - Final action by the Panel.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Final action by the Panel. 2472.11... LABOR RELATIONS AUTHORITY AND FEDERAL SERVICE IMPASSES PANEL FEDERAL SERVICE IMPASSES PANEL IMPASSES... SCHEDULES Procedures of the Panel § 2472.11 Final action by the Panel. (a) After due consideration of...

  18. 5 CFR 2471.11 - Final action by the Panel.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Final action by the Panel. 2471.11... LABOR RELATIONS AUTHORITY AND FEDERAL SERVICE IMPASSES PANEL FEDERAL SERVICE IMPASSES PANEL PROCEDURES OF THE PANEL § 2471.11 Final action by the Panel. (a) If the parties do not arrive at a settlement...

  19. 42 CFR 93.406 - Final HHS actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... prescribed in § 93.501, the ORI finding of research misconduct is the final HHS action on the research misconduct issues and the HHS administrative actions become final and will be implemented, except that...

  20. 32 CFR 856.7 - Action after final decision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... final decision. (a) Action by the Executive Director. The Executive Director or his/her designee will... relief was denied, the Executive Director will advise the applicant of reconsideration procedures and... Executive Director will send decisions requiring corrective action to the Chief of Staff, U.S. Air...

  1. 32 CFR 856.7 - Action after final decision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... final decision. (a) Action by the Executive Director. The Executive Director or his/her designee will... relief was denied, the Executive Director will advise the applicant of reconsideration procedures and... Executive Director will send decisions requiring corrective action to the Chief of Staff, U.S. Air...

  2. MATS E-Reporting Final Action

    EPA Pesticide Factsheets

    This page describes the interim final rule that will allow owners or operators of electric generating units to submit to EPA electronic emissions and compliance reports for the Mercury and Air Toxics rule.

  3. 42 CFR 93.406 - Final HHS actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... 42 Public Health 1 2013-10-01 2013-10-01 false Final HHS actions. 93.406 Section 93.406 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND...

  4. 42 CFR 93.406 - Final HHS actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... 42 Public Health 1 2014-10-01 2014-10-01 false Final HHS actions. 93.406 Section 93.406 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND...

  5. 42 CFR 93.406 - Final HHS actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... 42 Public Health 1 2012-10-01 2012-10-01 false Final HHS actions. 93.406 Section 93.406 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND...

  6. 42 CFR 93.406 - Final HHS actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... 42 Public Health 1 2011-10-01 2011-10-01 false Final HHS actions. 93.406 Section 93.406 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND...

  7. 7 CFR 97.108 - Amendments after final action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Amendments after final action. 97.108 Section 97.108 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... PLANT VARIETY AND PROTECTION Examinations, Allowances, and Denials § 97.108 Amendments after...

  8. Final voluntary release assessment/corrective action report

    SciTech Connect

    1996-11-12

    The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.

  9. 77 FR 37953 - Final Federal Agency Actions on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ... action relates to the proposed Fore River Bridge (State Route 3A over the Weymouth Fore River... bridge project. The actions by the USACE and USCG, related final actions by other Federal agencies, and... Federal Highway Administration Final Federal Agency Actions on Proposed Bridge Replacement...

  10. 31 CFR 800.601 - Finality of actions under section 721.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (Continued) OFFICE OF INVESTMENT SECURITY, DEPARTMENT OF THE TREASURY REGULATIONS PERTAINING TO MERGERS, ACQUISITIONS, AND TAKEOVERS BY FOREIGN PERSONS Finality of Action § 800.601 Finality of actions under...

  11. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document is a compilation of different issues identified by the Tiger Teams at the several locations of the Sandia National Laboratory. In this volume there are findings/concerns and the resultant responses and planned actions for these issues. Also included are the schedules and costs for the planned actions.

  12. 42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or finding of research misconduct. When the final HHS action does not result in a settlement or finding of... 42 Public Health 1 2011-10-01 2011-10-01 false Final HHS action with no settlement or finding...

  13. 42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or finding of research misconduct. When a final HHS action results in a settlement or research misconduct... 42 Public Health 1 2011-10-01 2011-10-01 false Final HHS action with settlement or finding...

  14. 77 FR 17565 - Notice of Final Federal Agency Actions on Proposed Transportation Improvements in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Transportation Improvements in Utah AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims...: Mr. Edward Woolford, Environmental Program Manager, Federal Highway Administration, 2520 West...

  15. 77 FR 22837 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial..., and the National Oceanic and Atmospheric Administration--National Marine Fisheries Service....

  16. 75 FR 59787 - Notice of Final Federal Agency Actions on Proposed Highway in New Hampshire

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-28

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in New Hampshire AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims for judicial.... Sikora, Environmental Programs Manager, Federal Highway Administration, 19 Chenell Drive, Suite...

  17. 76 FR 36173 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-21

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California... Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327... the State of California. Those actions grant licenses, permits, and approvals for the project....

  18. 76 FR 42161 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California... Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327... Diego, State of California. Those actions grant licenses, permits, and approvals for the project....

  19. 78 FR 28282 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California... Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327, U... County, in the State of California. Those actions grant licenses, permits, and approvals for the...

  20. 77 FR 26601 - Notice of Final Federal Agency Actions on Proposed Highway in Connecticut

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Connecticut AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial... actions on the highway project will be barred unless the claim is filed on or before October 24, 2012....

  1. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitations on Claims for.... 139(l)(1). The actions relate to the proposed Route 79/I-195 Interchange Project in Fall...

  2. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  3. Choosing Actions

    PubMed Central

    Rosenbaum, David A.; Chapman, Kate M.; Coelho, Chase J.; Gong, Lanyun; Studenka, Breanna E.

    2013-01-01

    Actions that are chosen have properties that distinguish them from actions that are not. Of the nearly infinite possible actions that can achieve any given task, many of the unchosen actions are irrelevant, incorrect, or inappropriate. Others are relevant, correct, or appropriate but are disfavored for other reasons. Our research focuses on the question of what distinguishes actions that are chosen from actions that are possible but are not. We review studies that use simple preference methods to identify factors that contribute to action choices, especially for object-manipulation tasks. We can determine which factors are especially important through simple behavioral experiments. PMID:23761769

  4. Action semantics modulate action prediction.

    PubMed

    Springer, Anne; Prinz, Wolfgang

    2010-11-01

    Previous studies have demonstrated that action prediction involves an internal action simulation that runs time-locked to the real action. The present study replicates and extends these findings by indicating a real-time simulation process (Graf et al., 2007), which can be differentiated from a similarity-based evaluation of internal action representations. Moreover, results showed that action semantics modulate action prediction accuracy. The semantic effect was specified by the processing of action verbs and concrete nouns (Experiment 1) and, more specifically, by the dynamics described by action verbs (Experiment 2) and the speed described by the verbs (e.g., "to catch" vs. "to grasp" vs. "to stretch"; Experiment 3). These results propose a linkage between action simulation and action semantics as two yet unrelated domains, a view that coincides with a recent notion of a close link between motor processes and the understanding of action language.

  5. 78 FR 40265 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Replacement in... final within the meaning of 23 U.S.C. Sec. 139(l)(1). The actions relate to the proposed Mitchell River Bridge (Bridge Street over the Mitchell River) Replacement Project in Chatham-Barnstable...

  6. 46 CFR 504.10 - Time constraints on final administrative actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Time constraints on final administrative actions. 504.10 Section 504.10 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS PROCEDURES FOR ENVIRONMENTAL POLICY ANALYSIS § 504.10 Time constraints on final administrative actions. No decision on...

  7. 42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or finding... 42 Public Health 1 2012-10-01 2012-10-01 false Final HHS action with settlement or finding of research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH...

  8. 42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or finding... 42 Public Health 1 2014-10-01 2014-10-01 false Final HHS action with settlement or finding of research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH...

  9. 42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or... 42 Public Health 1 2014-10-01 2014-10-01 false Final HHS action with no settlement or finding of research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH...

  10. 42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or finding... 42 Public Health 1 2013-10-01 2013-10-01 false Final HHS action with settlement or finding of research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH...

  11. 42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or... 42 Public Health 1 2013-10-01 2013-10-01 false Final HHS action with no settlement or finding of research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH...

  12. 42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or... 42 Public Health 1 2012-10-01 2012-10-01 false Final HHS action with no settlement or finding of research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH...

  13. Final Removal Action Report of the CPP-603A Basin Facility

    SciTech Connect

    D. V. Croson

    2007-01-04

    This Final Removal Action Report describes the actions that were taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Bason Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The Removal Action implemented consolidation and recording the location of debris objects containing radioactive cobalt (cobalt-60), removal and management of a small high-activity debris object (SHADO 1), the removal, treatment, and disposal of the basin water at the Idaho CERCLA Disposal Facility (ICDF) evaporation ponds, and filling the basins with grout/controlled low strength material.

  14. 78 FR 24292 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Fisheries, that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed... seven locations on SR 197 p.m. 3.2- 4.5, and US 199 20.5-26.5, and the replacement of a bridge on US 199... replacement of a bridge. The actions by the Federal agencies, and the laws under which such actions were...

  15. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    SciTech Connect

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

  16. 77 FR 1782 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... within the meaning of 23 U.S.C. 39(l)(1). The action relates to the proposed Fore River Bridge (State... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Bridge Replacement in... bridge project in the Commonwealth of Massachusetts. The project proposes to replace the...

  17. 77 FR 48203 - Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... agency actions subject to 23 U.S.C. 139 (I)(1). A claim seeking judicial review of the Federal agency... other Federal agencies that are final within the meaning of 23 U.S.C. 139 (I)(1). The actions relate to a proposed highway project, I-77 High Occupancy/Toll (HOT) lanes, from I-277 (Brookshire Freeway)...

  18. 77 FR 58906 - Notice of Final Federal Agency Actions on Proposed Highway in Minnesota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ...)(1). The actions relate to a proposed highway project on I-90 over the Mississippi River. The... River with a new bridge that meets structural and geometric standards as well as reconstruction of the I... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of...

  19. 78 FR 25524 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... Populations; E.O. 11593 Protection and Enhancement of the Cultural Environment; E.O. 13007 Indian Sacred Sites... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California... Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C....

  20. 75 FR 3522 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... and Enhancement of the Cultural Environment; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California... Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 USC...

  1. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Light Rail Project in... meaning of 23 U.S.C. 139(l)(1). The actions relate to the East Link Light Rail Transit Project in King... approvals for the following project in the State of Washington: East Link Light Rail Transit Project,...

  2. 12 CFR 563b.205 - May a court review OTS's final action on my conversion?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... Court of Appeals for the District of Columbia Circuit, to review the action under 12 U.S.C. 1464(i)(2)(B... 12 Banks and Banking 6 2013-01-01 2012-01-01 true May a court review OTS's final action on my conversion? 563b.205 Section 563b.205 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF...

  3. 12 CFR 563b.205 - May a court review OTS's final action on my conversion?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... Court of Appeals for the District of Columbia Circuit, to review the action under 12 U.S.C. 1464(i)(2)(B... 12 Banks and Banking 6 2014-01-01 2012-01-01 true May a court review OTS's final action on my conversion? 563b.205 Section 563b.205 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF...

  4. 12 CFR 563b.205 - May a court review OTS's final action on my conversion?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... Court of Appeals for the District of Columbia Circuit, to review the action under 12 U.S.C. 1464(i)(2)(B... 12 Banks and Banking 6 2012-01-01 2012-01-01 false May a court review OTS's final action on my conversion? 563b.205 Section 563b.205 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF...

  5. 12 CFR 563b.205 - May a court review OTS's final action on my conversion?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... Court of Appeals for the District of Columbia Circuit, to review the action under 12 U.S.C. 1464(i)(2)(B... 12 Banks and Banking 5 2011-01-01 2011-01-01 false May a court review OTS's final action on my conversion? 563b.205 Section 563b.205 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF...

  6. 12 CFR 563b.205 - May a court review OTS's final action on my conversion?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... Court of Appeals for the District of Columbia Circuit, to review the action under 12 U.S.C. 1464(i)(2)(B... 12 Banks and Banking 5 2010-01-01 2010-01-01 false May a court review OTS's final action on my conversion? 563b.205 Section 563b.205 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF...

  7. 78 FR 45997 - Notice of Final Federal Agency Actions on Transportation Project in Washington State

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Transportation Project in... Project, located in the City of Puyallup (Milepost 6.40) in Pierce County, Washington. The action by FHWA... traffic, which will accommodate the future SR 167 Extension interchange and removes the existing...

  8. 78 FR 59085 - Notice of Final Federal Agency Action on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Highway in California... Review of Actions by FHWA and other Federal agencies. SUMMARY: The FHWA, on behalf of the California... taken by the California Department of ] Transportation (Department) pursuant to its...

  9. 76 FR 53996 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-30

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims for judicial... . SUPPLEMENTARY INFORMATION: Effective July 1, 2007, the Federal Highway Administration (FHWA) assigned, and...

  10. 77 FR 52108 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Utah AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial Review of..., Design Program Manager, Federal Highway Administration, 2520 West 4700 South, Suite 9A, Salt Lake...

  11. 77 FR 5617 - Notice of Final Federal Agency Action on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Highway in Utah AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitations on Claims for Judicial Review of..., Federal Highway Administration, 2520 West 4700 South, Suite 9A, Salt Lake City, Utah 84129; telephone...

  12. 76 FR 36614 - Notice of Final Federal Agency Action on Proposed Highway in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ... Federal Highway Administration Notice of Final Federal Agency Action on Proposed Highway in Illinois AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims for judicial...-controlled, four- lane expressway on new right-of-way between the proposed Macomb Bypass in McDonough...

  13. 76 FR 41554 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial...; 8. Endangered Species Act of 1973; 9. Migratory Bird Treaty Act; 10. Title VI of the Civil...

  14. Action physics

    NASA Astrophysics Data System (ADS)

    McGinness, Lachlan P.; Savage, C. M.

    2016-09-01

    More than a decade ago, Edwin Taylor issued a "call to action" that presented the case for basing introductory university mechanics teaching around the principle of stationary action [E. F. Taylor, Am. J. Phys. 71, 423-425 (2003)]. We report on our response to that call in the form of an investigation of the teaching and learning of the stationary action formulation of physics in a first-year university course. Our action physics instruction proceeded from the many-paths approach to quantum physics to ray optics, classical mechanics, and relativity. Despite the challenges presented by action physics, students reported it to be accessible, interesting, motivational, and valuable.

  15. Complementary actions.

    PubMed

    Sartori, Luisa; Betti, Sonia

    2015-01-01

    Complementary colors are color pairs which, when combined in the right proportions, produce white or black. Complementary actions refer here to forms of social interaction wherein individuals adapt their joint actions according to a common aim. Notably, complementary actions are incongruent actions. But being incongruent is not sufficient to be complementary (i.e., to complete the action of another person). Successful complementary interactions are founded on the abilities: (i) to simulate another person's movements, (ii) to predict another person's future action/s, (iii) to produce an appropriate incongruent response which differ, while interacting, with observed ones, and (iv) to complete the social interaction by integrating the predicted effects of one's own action with those of another person. This definition clearly alludes to the functional importance of complementary actions in the perception-action cycle and prompts us to scrutinize what is taking place behind the scenes. Preliminary data on this topic have been provided by recent cutting-edge studies utilizing different research methods. This mini-review aims to provide an up-to-date overview of the processes and the specific activations underlying complementary actions.

  16. Complementary actions

    PubMed Central

    Sartori, Luisa; Betti, Sonia

    2015-01-01

    Complementary colors are color pairs which, when combined in the right proportions, produce white or black. Complementary actions refer here to forms of social interaction wherein individuals adapt their joint actions according to a common aim. Notably, complementary actions are incongruent actions. But being incongruent is not sufficient to be complementary (i.e., to complete the action of another person). Successful complementary interactions are founded on the abilities: (i) to simulate another person’s movements, (ii) to predict another person’s future action/s, (iii) to produce an appropriate incongruent response which differ, while interacting, with observed ones, and (iv) to complete the social interaction by integrating the predicted effects of one’s own action with those of another person. This definition clearly alludes to the functional importance of complementary actions in the perception–action cycle and prompts us to scrutinize what is taking place behind the scenes. Preliminary data on this topic have been provided by recent cutting-edge studies utilizing different research methods. This mini-review aims to provide an up-to-date overview of the processes and the specific activations underlying complementary actions. PMID:25983717

  17. Remedial action selection report Maybell, Colorado, site. Final report

    SciTech Connect

    1996-12-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The site is 2.5 mi (4 km) northeast of the Yampa River on relatively flat terrain broken by low, flat-topped mesas. U.S. Highway 40 runs east-west 2 mi (3.2 km) south of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. The site is situated between Johnson Wash to the east and Rob Pit Mine to the west. Numerous reclaimed and unreclaimed mines are in the immediate vicinity. Aerial photographs (included at the end of this executive summary) show evidence of mining activity around the Maybell site. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [ml]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd 3 (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3}(420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}).

  18. Definition of primary mode of action of a combination product. Final rule.

    PubMed

    2005-08-25

    The Food and Drug Administration (FDA) is amending its combination product regulations to define "mode of action'' (MOA) and "primary mode of action" (PMOA). Along with these definitions, the final rule sets forth an algorithm the agency will use to assign combination products to an agency component for regulatory oversight when the agency cannot determine with reasonable certainty which mode of action provides the most important therapeutic action of the combination product. Finally, the final rule will require a sponsor to base its recommendation of the agency component with primary jurisdiction for regulatory oversight of its combination product by using the PMOA definition and, if appropriate, the assignment algorithm. The final rule is intended to promote the public health by codifying the agency's criteria for the assignment of combination products in transparent, consistent, and predictable terms.

  19. 75 FR 1114 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... Doc No: 2010-110] DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT..., 2007, the Federal Highway Administration (FHWA) assigned, and the California Department...

  20. 10 CFR 202.24 - Final action by the appropriate DOE official.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Production or Disclosure in Response to Subpoenas or Demands of Courts or Other Authorities § 202.24 Final action by the appropriate DOE official. If the General Counsel approves a demand for the production...

  1. Final alternatives assessment: Other contamination sources: Interim response action, South Tank Farm Plume. Final report

    SciTech Connect

    Not Available

    1990-08-01

    The South Tank Farm Plume (STFP) is located in the southern half of sections 1 and 2. It is a composite plume of C6H6, MEC6H5, XYLEN, DCPD, and BCHPD which is migrating from the area of tank 464A. Recent investigations have shown that the STFP is being biodegraded naturally and will not migrate into either Lake Ladora or Lower Derby Lake prior to implementation of the final remedy. Monitoring with the specific objectives of (1) Verifying the rate of migration and (2) Locating the leading edge of the plume over the time frame of the IRA is proposed as the preferred alternative action. Sections of this assessment provide information on: (1) Site description-history, previous investigations, hydrogeology, LNAPL plume; (2) IRA objectives and evaluation; and (3) Work plan of the IRA-well network, sampling frequency. Appendices include comments and responses.

  2. Action Learning.

    ERIC Educational Resources Information Center

    1996

    These four papers were presented at a symposium on action learning moderated by Lex Dilworth at the 1996 conference of the Academy of Human Resource Development. "Developing an Infrastructure for Individual and Organizational Change: Transfer of Learning from an Action Reflection Learning (ARL) Program" (ARL Inquiry) reports findings…

  3. 7 CFR 97.107 - Reconsideration and final action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) COMMODITY LABORATORY TESTING PROGRAMS PLANT VARIETY AND PROTECTION Examinations, Allowances, and Denials § 97.107... after the first examination. Any such denial shall be final unless appealed by the applicant to...

  4. The role of immediate and final goals in action planning: an fMRI study.

    PubMed

    Majdandzić, Jasminka; Grol, Meike J; van Schie, Hein T; Verhagen, Lennart; Toni, Ivan; Bekkering, Harold

    2007-08-15

    To interact effectively with our environment, we need to specify the intended outcomes (goals) of our actions. In this process, immediate goals and final goals can be regarded as different levels within a hierarchically organized system for action planning: immediate goals and movement details are selected to accomplish more remote goals. Behavioral studies support this notion of different levels of action planning, but the neurophysiological basis remains unclear. Using fMRI, we examined the neural correlates of preparing object manipulations based on either the desired end-state (the final goal) or the initial movement towards a target (the immediate goal). Subjects had to insert an object (consisting of a large and a small cube) into one of two corresponding large and small slots. The subjects were cued on either which slot to fill (Final Goal trials) or which object part to grasp (Immediate Goal trials). These actions required similar movements, but different planning. During Final Goal trials, there was differential preparatory activity along the superior frontal gyrus (bilaterally) and in left inferior parietal cortex. Immediate Goal trials evoked differential activity in occipito-parietal and occipito-temporal cortex. These findings support the notion that actions can be planned at different levels. We show that different fronto-parietal circuits plan the same action, by a relative emphasis on either selecting a sequence of movements to achieve a desired end-state, or selecting movements spatially compatible with given object properties.

  5. Final consolidated action plan to Tiger Team. Volume 2, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  6. Final consolidated action plan to Tiger Team. Volume 1, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  7. Final Record of Decision/Remedial Action Plan, Nine Sites, Sierra Army Depot, Lassen County, California.

    DTIC Science & Technology

    1996-10-01

    section provides the declaration portion of the ROD /RAP for the Construction Debris Landfill. 5.1.1 Location The Construction Debris Landfill is...and Role of Response Action This ROD /RAP presents the final response action for the Construction Debris Landfill. This site poses no potential threat...AMMUNITION DEMILITARIZATION AND RENOVATION AREA BUILDING 1003 AREA CHEMICAL BURIAL SITE CONSTRUCTION DEBRIS LANDFILL EXISTING LANDFILL EXISTING

  8. 75 FR 62182 - Notice of Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... agency actions subject to 23 U.S.C. 139 (I)(1). A claim seeking judicial review of the Federal agency... by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139 (I)(1). The actions relate to a proposed highway project, NC 24 Improvements, from 2.8 miles east of I-95 to I-40...

  9. 22 CFR 134.8 - Official authorized to take final action under the Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the Act. 134.8 Section 134.8 Foreign Relations DEPARTMENT OF STATE MISCELLANEOUS EQUAL ACCESS TO... Act. The Department of State official who renders the final agency decision in a covered proceeding is authorized to take final action on matters pertaining to the Equal Access to Justice Act as applied to...

  10. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final...

  11. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final...

  12. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final...

  13. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final...

  14. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final...

  15. 78 FR 27473 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River... within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the Tappan Zee Hudson River Crossing... FHWA published a ``Notice of Final Federal Agency Actions'' on the Tappan Zee Hudson River...

  16. Action perception predicts action performance

    PubMed Central

    Bailey, Heather R.; Kurby, Christopher A.; Giovannetti, Tania; Zacks, Jeffrey M.

    2013-01-01

    Everyday action impairments often are observed in demented older adults, and they are common potential barriers to functional independence. We evaluated whether the ability to segment and efficiently encode activities is related to the ability to execute activities. Further, we evaluated whether brain regions important for segmentation also were important for action performance. Cognitively healthy older adults and those with very mild or mild dementia of the Alzheimer's type watched and segmented movies of everyday activities and then completed the Naturalistic Action Test. Structural MRI was used to measure volume in the dorsolateral prefrontal cortex (DLPFC), medial temporal lobes (MTL), posterior cortex, and anterior cingulate cortex (ACC). Dementia status and the ability to segment everyday activities strongly predicted naturalistic action performance, and MTL volume largely accounted for this relationship. In addition, the current results supported the Omission-Commission Model: Different cognitive and neurological mechanisms predicted different types of action error. Segmentation, dementia severity, and MTL volume predicted everyday omission errors, DLPFC volume predicted commission errors, and ACC volume predicted action additions. These findings suggest that event segmentation may be critical for effective action production, and that the segmentation and production of activities may recruit the same event representation system. PMID:23851113

  17. Action perception predicts action performance.

    PubMed

    Bailey, Heather R; Kurby, Christopher A; Giovannetti, Tania; Zacks, Jeffrey M

    2013-09-01

    Everyday action impairments often are observed in demented older adults, and they are common potential barriers to functional independence. We evaluated whether the ability to segment and efficiently encode activities is related to the ability to execute activities. Further, we evaluated whether brain regions important for segmentation also were important for action performance. Cognitively healthy older adults and those with very mild or mild dementia of the Alzheimer's type watched and segmented movies of everyday activities and then completed the Naturalistic Action Test. Structural MRI was used to measure volume in the dorsolateral prefrontal cortex (DLPFC), medial temporal lobes (MTL), posterior cortex, and anterior cingulate cortex (ACC). Dementia status and the ability to segment everyday activities strongly predicted naturalistic action performance, and MTL volume largely accounted for this relationship. In addition, the current results supported the Omission-Commission Model: Different cognitive and neurological mechanisms predicted different types of action error. Segmentation, dementia severity, and MTL volume predicted everyday omission errors, DLPFC volume predicted commission errors, and ACC volume predicted action additions. These findings suggest that event segmentation may be critical for effective action production, and that the segmentation and production of activities may recruit the same event representation system.

  18. 21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATIVE PRACTICES AND PROCEDURES General... must first be the subject of a final administrative decision based on a petition submitted under § 10... the subject of an administrative decision based upon a petition for stay of action submitted...

  19. 18 CFR 401.90 - Appeals from final Commission action; Time for appeals.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Appeals from final Commission action; Time for appeals. 401.90 Section 401.90 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Administrative and...

  20. 75 FR 27384 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California... Road interchange in the City of Stockton (post mile 15.0), in San Joaquin County, State of California...-mail: dominic.hoang@dot.gov . For the California Department of Transportation: Gail Miller,...

  1. 76 FR 46890 - Notice of Final Federal Agency Actions on Proposed Highway in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... notice, FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(1). A claim seeking... applies. FOR FURTHER INFORMATION CONTACT: Pete Jilek, Urban Area Engineer, Federal Highway Administration...@.dot.gov. The FHWA Washington Division Urban Area Engineer's regular office hours are between 6...

  2. 25 CFR 83.11 - Independent review, reconsideration and final action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Independent review, reconsideration and final action. 83.11 Section 83.11 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR TRIBAL GOVERNMENT PROCEDURES FOR ESTABLISHING THAT AN AMERICAN INDIAN GROUP EXISTS AS AN INDIAN TRIBE § 83.11...

  3. 25 CFR 83.11 - Independent review, reconsideration and final action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Independent review, reconsideration and final action. 83.11 Section 83.11 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR TRIBAL GOVERNMENT PROCEDURES FOR ESTABLISHING THAT AN AMERICAN INDIAN GROUP EXISTS AS AN INDIAN TRIBE § 83.11...

  4. 42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or...

  5. 42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement...

  6. 75 FR 51160 - Notice of Final Federal Agency Actions on Proposed Highway in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a.... Wildlife: Endangered Species Act [16 U.S.C. 1531-1544 and Section 1536], Migratory Bird Treaty Act ....

  7. 18 CFR 401.90 - Appeals from final Commission action; Time for appeals.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Appeals from final Commission action; Time for appeals. 401.90 Section 401.90 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Administrative and...

  8. 18 CFR 401.90 - Appeals from final Commission action; Time for appeals.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Appeals from final Commission action; Time for appeals. 401.90 Section 401.90 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Administrative and...

  9. 18 CFR 401.90 - Appeals from final Commission action; Time for appeals.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Appeals from final Commission action; Time for appeals. 401.90 Section 401.90 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Administrative and...

  10. Essential Communication and Documentation Skills. Module: Final Assessment and Action Planning.

    ERIC Educational Resources Information Center

    Medina, Muriel; And Others

    This module is the 10th of 10 in the Essential Communication and Documentation Skills curriculum. It develops final assessment and action planning, workplace literacy skills identified as being directly related to the job of the direct care worker. The curriculum is designed to improve the competence of New York State Division for Youth direct…

  11. A Plutonium Finishing Plant Model for the Cercla Removal Action and Decommissioning Construction Final Report

    SciTech Connect

    Hopkins, A.

    2008-07-01

    The joint policy between the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE) for decommissioning buildings at DOE facilities documents an agreement between the agencies to perform decommissioning activities including demolition under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The use of removal actions for decommissioning integrates EPA oversight authority, DOE lead agency responsibility, and state authority for decommissioning activities. Once removal actions have been performed under CERCLA, a construction completion report is required to document the completion of the required action. Additionally, a decommissioning report is required under DOE guidance. No direct guidance was found for documenting completion of decommissioning activities and preparing a final report that satisfies the CERCLA requirements and the DOE requirements for decommissioning. Additional guidance was needed for the documentation of construction completion under CERCLA for D and D projects undertaken under the joint policy that addresses the requirements of both agencies. A model for the construction completion report was developed to document construction completion for CERCLA D and D activities performed under the joint EPA/DOE policy at the Plutonium Finishing Plant (PFP). The model documentation report developed at PFP integrates the DOE requirements for establishing decommissioning end-points, documenting end-point completion and preparing a final decommissioning report with the CERCLA requirements to document completion of the action identified in the Action Memorandum (AM). The model includes the required information on health and safety, data management, cost and schedule and end-points completion. (authors)

  12. Final Action Plan to Tiger Team. Environmental, safety and health assessment

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  13. Citizen's actions

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The role played by individual citizens as consumers of energy was examined, with emphasis on studying ways in which their action could result in energy conservation. It was shown that there are ways that energy can be conserved in this way, with citizens acting either individually or in groups. The potential savings are significant, but the actual savings may be quite small. The citizens need to be motivated to save and to believe in a conservation ethic; developing such an ethic is difficult, and perhaps not responsive to the shotgun approach now being attempted. The true course of action may be to synthesize new societal structures that provide the maximum evolution of culture within the limitation of scarce energy resources.

  14. Industrial Sites Project Establishment of Final Action Levels, Rev. No.: 0

    SciTech Connect

    Boehlecke, Robert F.

    2006-02-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  15. Neural mechanisms underlying immediate and final action goals in object use reflected by slow wave brain potentials.

    PubMed

    van Schie, Hein T; Bekkering, Harold

    2007-05-07

    Event-related brain potentials were used to study the neural mechanisms underlying goal-directed object use distinguishing between processes supporting immediate and final action goals during action planning and execution. Subjects performed a grasping and transportation task in which actions were cued either with the immediate action goal (the part of the object to grasp) or with the final action goal of the movement (the end position for transportation). Slow wave potentials dissociated between processes supporting immediate and final goals: reaching for the object was accompanied by the development of a parietal-occipital slow wave that peaked in congruency with the grasping event, whereas transport of the object towards the final goal location was found accompanied by slow wave components developing over left frontal regions with a peak towards the movement end. Source localization of cueing differences indicated activation centered around the parieto-occipital sulcus during reaching of the immediate action goal, followed by enhanced activation in the anterior prefrontal cortex during transport to the final action goal. These results suggest the existence of separate neural controllers for immediate and final action goals during the execution of goal-directed actions with objects.

  16. 76 FR 54288 - Notice of Final Federal Agency Actions on Proposed Bridge and Approach Roadways in Nevada and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Bridge and Approach... Federal agencies that are final within the meaning of 23 U.S.C. 139(I)(1). The actions relate to the proposed Laughlin-Bullhead City Bridge project in Laughlin, Clark County, Nevada; and in Bullhead...

  17. Final Actions in Arkansas; Governors' Proposals in Alabama, Delaware, Florida, Louisiana, Oklahoma, Tennessee and Virginia. Legislative Report No. 2

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2010

    2010-01-01

    The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. This report presents final legislative and budget actions in…

  18. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  19. Conscious Action/Zombie Action

    PubMed Central

    Shepherd, Joshua

    2015-01-01

    Abstract I argue that the neural realizers of experiences of trying (that is, experiences of directing effort towards the satisfaction of an intention) are not distinct from the neural realizers of actual trying (that is, actual effort directed towards the satisfaction of an intention). I then ask how experiences of trying might relate to the perceptual experiences one has while acting. First, I assess recent zombie action arguments regarding conscious visual experience, and I argue that contrary to what some have claimed, conscious visual experience plays a causal role for action control in some circumstances. Second, I propose a multimodal account of the experience of acting. According to this account, the experience of acting is (at the very least) a temporally extended, co‐conscious collection of agentive and perceptual experiences, functionally integrated and structured both by multimodal perceptual processing as well as by what an agent is, at the time, trying to do. PMID:27667859

  20. Conscious Action/Zombie Action.

    PubMed

    Shepherd, Joshua

    2016-06-01

    I argue that the neural realizers of experiences of trying (that is, experiences of directing effort towards the satisfaction of an intention) are not distinct from the neural realizers of actual trying (that is, actual effort directed towards the satisfaction of an intention). I then ask how experiences of trying might relate to the perceptual experiences one has while acting. First, I assess recent zombie action arguments regarding conscious visual experience, and I argue that contrary to what some have claimed, conscious visual experience plays a causal role for action control in some circumstances. Second, I propose a multimodal account of the experience of acting. According to this account, the experience of acting is (at the very least) a temporally extended, co-conscious collection of agentive and perceptual experiences, functionally integrated and structured both by multimodal perceptual processing as well as by what an agent is, at the time, trying to do.

  1. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    SciTech Connect

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE.

  2. Action Learning: Avoiding Conflict or Enabling Action

    ERIC Educational Resources Information Center

    Corley, Aileen; Thorne, Ann

    2006-01-01

    Action learning is based on the premise that action and learning are inextricably entwined and it is this potential, to enable action, which has contributed to the growth of action learning within education and management development programmes. However has this growth in action learning lead to an evolution or a dilution of Revan's classical…

  3. Action principles in nature

    NASA Astrophysics Data System (ADS)

    Barrow, John D.; Tipler, Frank J.

    1988-01-01

    Physical theories have their most fundamental expression as action integrals. This suggests that the total action of the universe is the most fundamental physical quantity, and hence finite. In this article it is argued that finite universal action implies that the universe is spatially closed. Further, the possible spatial topologies, the types of matter that can dominate the early universe dynamics, and the form of any quadratic additions to the lagrangian of general relativity are constrained. Initial and final cosmological curvature singularities are required to avoid a universal action singularity.

  4. 12 CFR 192.205 - May a court review the appropriate Federal banking agency's final action on my conversion?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the U.S. Court of Appeals for the District of Columbia Circuit, to review the action under 12 U.S.C... 12 Banks and Banking 1 2014-01-01 2014-01-01 false May a court review the appropriate Federal banking agency's final action on my conversion? 192.205 Section 192.205 Banks and Banking COMPTROLLER...

  5. 12 CFR 192.205 - May a court review the appropriate Federal banking agency's final action on my conversion?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the U.S. Court of Appeals for the District of Columbia Circuit, to review the action under 12 U.S.C... 12 Banks and Banking 1 2012-01-01 2012-01-01 false May a court review the appropriate Federal banking agency's final action on my conversion? 192.205 Section 192.205 Banks and Banking COMPTROLLER...

  6. 12 CFR 192.205 - May a court review the appropriate Federal banking agency's final action on my conversion?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the U.S. Court of Appeals for the District of Columbia Circuit, to review the action under 12 U.S.C... 12 Banks and Banking 1 2013-01-01 2013-01-01 false May a court review the appropriate Federal banking agency's final action on my conversion? 192.205 Section 192.205 Banks and Banking COMPTROLLER...

  7. 77 FR 65929 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River.... Sec. 139(l)(1). The actions relate to the Tappan Zee Hudson River Crossing Project located in Rockland... the following highway project in the State of New York: Tappan Zee Hudson River Crossing...

  8. 78 FR 42151 - Notice of Final Federal Agency Actions on the Goethals Bridge Replacement Project in New York and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... of a replacement bridge with a new six-lane structure directly and entirely south of the existing... Federal Highway Administration Notice of Final Federal Agency Actions on the Goethals Bridge Replacement... meaning of 23 U.S.C. 139(l)(1). The actions relate to the Goethals Bridge Replacement Project located...

  9. 75 FR 43160 - Clean Water Act Section 303(d): Final Agency Action on One Arkansas Total Maximum Daily Load (TMDL)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Clean Water Act Section 303(d): Final Agency Action on One Arkansas Total Maximum Daily Load (TMDL) AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This...

  10. 75 FR 3277 - Notice of Final Federal Agency Actions on State Highway 99 (Segment F-2) in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... Federal Highway Administration Notice of Final Federal Agency Actions on State Highway 99 (Segment F-2) in... actions relate to a proposed highway project, Grand Parkway (State Highway 99) Segment F-2, from State... the following highway project in the State of Texas: Grand Parkway (State Highway 99) Segment F-2...

  11. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    SciTech Connect

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete.

  12. Interim Response Action Basin F Liquid Incineration Project Final Draft Human Health Risk Assessment. Volume 1.

    DTIC Science & Technology

    1991-07-01

    91222R02 2ND COPY Interim Response Action Basin F Liquid Incineration Project FINAL DRAFT HUMAN HEALTH RISK ASSESSMENT V olumne I Preplaced Remedial...The Use of OELs and NAAQSs for Calculating Inhalation RfJ)s 9-13 9.4.2.2 Adjustments to Inhalation RfDs 9-14 793C/FM V 7/22/91 TABLE OF CONTENTS...HENDERSON RTHOL THOL HAZELTIN A I LE-- f V , Rocky Mountain WELB DA Arsenal A"ADA AA -AIL- VIM IT RUM Doi T p- 0 Denver kl& MOR SHER DAN r go, "- V

  13. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    SciTech Connect

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE`s satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson.

  14. 77 FR 59035 - Notice of Final Federal Agency Action on Proposed Bridge Rehabilitation and Restoration in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... compliance with modern standards, in particular the Americans with Disabilities Act. It is one of the largest... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION... on Claims for Judicial Review of Action by FHWA. SUMMARY: This notice announces action taken by...

  15. 77 FR 6622 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... review. It is one of ] the largest projects to be undertaken by MassDOT under the Commonwealth's $3... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION... Judicial Review of Action by FHWA. SUMMARY: This notice announces action taken by the FHWA that is...

  16. Final record of decision/remedial action plan, nine sites, Sierra Army Depot, Lassen County, California

    SciTech Connect

    Arroyo, S.L.; Larson, A.M.; Parent, M.M.; Silvers, J.M.; Weaverling, P.H.

    1996-10-01

    This ROD/RAP presents the selected response actions for nine sites at SIAD. The response actions were selected by the US Department of the Army (Army) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments Reauthorization Act of 1986 (SARA)(collectively referred to as CERCLA), the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), and Section 6.8 of the California Health and Safety Code. This ROD/RAP includes the factual and legal basis for selecting the response action at each of the nine sites listed above. The data used to support the selected response action are contained in the Administrative Record for each site. The State of California as represented by the Department of Toxic Substances Control (DTSC), and the Lahontan Regional Water Quality Control Board (RWQCB) concur with the selected response action at each site.

  17. Remedial action at the Acid/Pueblo Canyon site, Los Alamos, New Mexico. Final report

    SciTech Connect

    1984-10-01

    The Acid/Pueblo Canyon site (TA-45) was designated in 1976 for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). During the period 1943 to 1964 untreated and treated liquid wastes generated by nuclear weapons research activities at the Los Alamos Scientific Laboratory (LASL) were discharged into the two canyons. A survey of the site conducted by LASL in 1976 to 1977 identified two areas where radiological contamination exceeded criteria levels. The selected remedial action was based on extensive radiological characterization and comprehensive engineering assessments and comprised the excavation and disposal of 390 yd/sup 3/ of contaminated soil and rock. This document describes the background to the remedial action, the parties involved in administering and executing it, the chronology of the work, verification of the adequacy of the remedial action, and the cost incurred. 14 references, 5 figures, 5 tables.

  18. Final decision document for other contamination sources, interim response action, shell section 36 trenches, RMA

    SciTech Connect

    1990-04-01

    The shell section 36 trenches were used from 1952 to 1966 for land disposal of liquid and solid wastes generated from pesticide manufacture. They have been shown to be a source of soil and ground water contamination for volatile and semivolatile compounds. A dense non-aqueous phase liquid (DNAPL) is also believed to have originated from the area. The objective of the interim response action is to reduce the lateral migration of contaminants emanating from the trenches. The preferred IRA alternative consists of (1) A physical barrier encircling the trenches and (2) a soil and vegetative cover to eliminate recharge. This final decision document provides summaries of: (1). Alternatives considered (2). Significant events leading to the initiation of the IRA (3). The IRA project (4). Applicable or relevant and appropriate requirements, standards.

  19. 75 FR 78340 - Notice of Final Federal Agency Actions on Proposed Highway in Nevada

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... meaning of 23 U.S.C. 139(l)(1). The actions relate to I-15 Corridor Improvements from Sahara Avenue to US... Interstate 15 (I-15) corridor and major street connections beginning south of the I-15/Sahara...

  20. Regulatory Actions - Final Mercury and Air Toxics Standards (MATS) for Power Plants

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency (EPA) has proposed Mercury and Air Toxics Standards (MATS) for power plants to limit mercury, acid gases and other toxic pollution from power plants. This page describes Federal regulatory actions.

  1. 77 FR 61825 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-11

    ... actions relate to a proposed highway project, Willow Road (FAP 305) between Illinois Route 43 (Waukegan... in the State of Illinois: reconstruct and widen Willow Road (FAP 305) from Illinois Route...

  2. Intergranular attack of alloy 600: Simulation and remedial action tests: Final report

    SciTech Connect

    Daret, J.; Feron, D.

    1989-02-01

    The intergranular attack (IGA) that affects alloy 600 tubes in the tube sheet crevices of PWR steam generators is hard to simulate in laboratory studies. For this study, a special apparatus was designed with a range of representative materials, mechanical conditions and geometry. The design also took account of sludge piles, thermal fluxes and water chemistry. During a first series of seven model boiler tests, chemical parameters and test procedures were adjusted to finally obtain a field prototypical degradation of tubing over a significant length within the tube sheet crevice for the case of caustic pollution. IGA was not produced for the river water in-leakage case. A second series of model boiler tests also showed the possibility of producing a representative IGA by initially filling the tube sheet crevices with concentrated caustic solutions. A third series of five model boiler tests aimed at studying in the effectiveness of remedial actions on either virgin of IGA affected tubing. Tube sheet crevice flushing operations using the natural circulation procedure showed a poor efficiency for moving concentrated contaminants, but they succeeded in forcing chemicals additives (acetic acid or boric acid) within the non-occluded portions of crevices. This off-line treatment resulted in a reduction in the progression rate of the pre-existing IGA by a factor of 2 to 3. Simulation of this treatment on virgin material showed that this result was obtained because acetate or borate shifted the cation-to-anion equivalent ratio to well under one. However this off-line treatment could not prevent the occurrence of intergranular stress corrosion cracking (IGSCC) near the top of crevices, since caustic continued to hideout under full power operation. The best remedial action consisted of a combination of off-line and on-line boric acid treatment. IGSCC was prevented both on virgin and IGA affected tubes. 3 figs., 3 tabs.

  3. Protective Action Guides (PAGs)

    EPA Pesticide Factsheets

    The Protective Action Guide (PAG) manual contains radiation dose guidelines that would trigger public safety measures. EPA developed Protective Action Guides to help responders plan for radiation emergencies.

  4. Final corrective action study for the former CCC/USDA facility in Ramona, Kansas.

    SciTech Connect

    LaFreniere, L. M.

    2011-04-20

    Past operations at a grain storage facility formerly leased and operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in Ramona, Kansas, resulted in low concentrations of carbon tetrachloride in groundwater that slightly exceed the regulatory standard in only one location. As requested by the Kansas Department of Health and Environment, the CCC/USDA has prepared a Corrective Action Study (CAS) for the facility. The CAS examines corrective actions to address groundwater impacted by the former CCC/USDA facility but not releases caused by other potential groundwater contamination sources in Ramona. Four remedial alternatives were considered in the CAS. The recommended remedial alternative in the CAS consists of Environmental Use Control to prevent the inadvertent use of groundwater as a water supply source, coupled with groundwater monitoring to verify the continued natural improvement in groundwater quality. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) has directed Argonne National Laboratory to prepare a Corrective Action Study (CAS), consistent with guidance from the Kansas Department of Health and Environment (KDHE 2001a), for the CCC/USDA grain storage facility formerly located in Ramona, Kansas. This effort is pursuant to a KDHE (2007a) request. Although carbon tetrachloride levels at the Ramona site are low, they remain above the Kansas Tier 2 risk-based screening level (RBSL) and the U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 5 {micro}g/L (Kansas 2003, 2004). In its request for the CAS, the KDHE (2007a) stated that, because of these levels, risk is associated with potential future exposure to contaminated groundwater. The KDHE therefore determined that additional measures are warranted to limit future use of the property and/or exposure to contaminated media as part of site closure. The KDHE further requested comparison of at least two corrective

  5. Final Corrective Action Study for the Former CCC/USDA Facility in Hanover, Kansas

    SciTech Connect

    LaFreniere, Lorraine M.

    2013-11-01

    Low concentrations of carbon tetrachloride in groundwater and vapor intrusion into a limited number of residences (attributable to the contaminant concentrations in groundwater) have been identified in Hanover, Kansas, at and near a grain storage facility formerly leased and operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). At the request of the Kansas Department of Health and Environment (KDHE 2009h), the CCC/USDA has prepared this Corrective Action Study (CAS) for the facility. The CAS examines corrective actions to address the contamination in groundwater and soil vapor.

  6. Action Research: Rethinking Lewin.

    ERIC Educational Resources Information Center

    Dickens, Linda; Watkins, Karen

    1999-01-01

    Explores both historical and contemporary definitions of action research. Describes the process and goals of action research in the tradition of Lewin. Presents a case study of an action-research project involving two teams in a high-technology corporation that depicts the process in action. (Author/CCM)

  7. Action Research: Measuring Literacy Programme Participants' Learning Outcomes. Results of the Final Phase (2011-2014)

    ERIC Educational Resources Information Center

    Bolly, Madina; Jonas, Nicolas

    2015-01-01

    Action Research on Measuring Literacy Programme Participants' Learning Outcomes (RAMAA) aims to develop, implement and collaborate on the creation of a methodological approach to measure acquired learning and study the various factors that influence its development. This report examines how RAMAA I has been implemented over the past four years in…

  8. 75 FR 70349 - Notice of Final Federal Agency Actions on Proposed Highways in Alaska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... Highway from Lucus Road to Big Lake Road, in the Matanuska-Susitna Borough, State of Alaska. Those actions... improvements between Lucus Road and Big Lake Road, a distance of approximately eight miles. The five-lane... depressed grass median from Church Road west to Big Lake Road. Existing frontage roads would be...

  9. 77 FR 48586 - Notice of Final Federal Agency Actions on United States Highway 77

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-14

    ... Corpus Christi, Texas to US 83 in Harlingen, Texas. Those actions grant licenses, permits, and approvals..., Room 826, Austin, Texas 78701; telephone: (512) 536-5960; email: gregory.punske@dot.gov . The FHWA Texas Division Office's normal business hours are 7:45 a.m. to 4:15 p.m. (central time) Monday...

  10. 75 FR 54420 - Notice of Final Federal Agency Actions on US 290/Hempstead Corridor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    .... 1251- 1342]; Land and Water Conservation Fund (LWCF) . 8. Executive Orders: E.O. 11990 Protection of...) in Harris County, Texas. Those actions grant licenses, permits, and approvals for the project..., District B (South), Federal Highway Administration, 300 East 8th Street, Room 826 Austin, Texas...

  11. 76 FR 16470 - Notice of Final Federal Agency Actions on Proposed Highway in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... water management ] measures. The project also includes mitigation and restoration actions which are...]; 7. Wetlands and Water Resources: Clean Water Act (Section 404, Section 401, Section 319) ; Land and Water Conservation Fund ; Safe Drinking Water Act ; TEA-21 Wetlands Mitigation [23 U.S.C....

  12. 76 FR 410 - Notice of Final Federal Agency Actions on Proposed Highway in Alaska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ... and Low Income Populations; E.O. 11593 Protection and Enhancement of Cultural Resources; E.O. 13007... which such actions were taken, including but not limited to: 1. General: National Environmental Policy... Resources: Section 106 of the National Historic Preservation Act of 1966, as amended [16 U.S.C. 470(f)...

  13. 76 FR 44649 - Notice of Final Federal Agency Actions on Proposed Highway in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... USACE involvement with this project is limited to approving the Section 404 permit for the project. This... notice and all laws under which such actions were taken, including but not limited to: 1. General.... 661- 667(d)]; and Migratory Bird Treaty Act . 5. Historic and Cultural Resources: Section 106 of...

  14. 76 FR 53706 - Notice of Final Federal Agency Actions on Proposed Highway in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ... and Low Income Populations; E.O. 11593 Protection and Enhancement of Cultural Resources; E.O. 13007..., as amended under which such actions were taken, including but not limited to: 1. General: National.... 1801 et seq.]. 5. Historic and Cultural Resources: Section 106 of the National Historic...

  15. 76 FR 60583 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ...) et seq.]. 7. Bald and Golden Eagle Protection Act [16 U.S.C. 688-688d]. Previous actions taken by the... affect, but not jeopardize, the bald eagle. The USFWS also concluded that the project was not likely to... Bald Eagle Take Exempted Under ESA permit (No. MB218918-0) for the incidental take of the bald...

  16. 76 FR 1664 - Notice of Final Federal Agency Actions on State Highway 99 (Segment G)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... 45 (I-45) to US 59 in Harris and Montgomery Counties, Texas. Those actions grant licenses, permits...- 45 to US 59 in Harris and Montgomery Counties; FHWA Project Reference Number: FHWA-TX-EIS-03-03-F... in northern Harris County at I-45 and then proceed northeast through Montgomery County and end at...

  17. 76 FR 61476 - Notice of Final Federal Agency Actions on Proposed Highway in Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed multi-modal project (Provo-Orem Bus Rapid...: The Provo-Orem Bus Rapid Transit project number F- R399(83). The project has roadway and...

  18. 76 FR 77301 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... Todd Drive in Dane County, Wisconsin. Those actions grant approvals for the project. The project will... Nesbitt Road to Commerce Park Drive. Stage 2 is currently scheduled for construction from approximately.../14 (Beltline) Whitney Way to Todd Drive, Dane County, Wisconsin, Project ID 1206-07-03. The...

  19. 76 FR 65776 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ...). The actions relate to a proposed highway project, US 41 (Memorial Drive to County M) in Brown County... from Memorial Drive to County M, The project will also reconstruct I-43 from US 41 to Atkinson Drive...-43 via US 41. The project limits on US 41 extend from Memorial Drive to County M, a distance...

  20. 78 FR 66419 - Notice of Final Federal Agency Actions on Proposed Highway in Pennsylvania

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-05

    ...(c)]; Native American Grave Protection and Repatriation Act (NAGPRA) . 6. Social and Economic: Civil... Floodplain Management; E.O. 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations; E.O. 11593 Protection and Enhancement of Cultural Resources; E.O....

  1. The Relationship between High School Students' Attitudes and Actions toward "Slow Learners." Final Report.

    ERIC Educational Resources Information Center

    Miller, Carol T.; Gibbs, Elizabeth D.

    The relationship between high school students' attitudes and their involvement in a peer tutoring program for slow learners was examined, on the basis of M. Fishbein's theory of reasoned action, which suggests that the best predictor of behavior is the individual's intention to perform the behavior and that intentions are functions of attitude and…

  2. 77 FR 75254 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... actions relate to a proposed highway and transit project within the Tier 2 Elgin O'Hare--West Bypass project corridor, which is located along the Elgin-O'Hare Expressway/Thorndale ] Avenue between Chicago O'Hare International Airport (O'Hare) and Lake Street/US Route 20, and on a proposed alignment...

  3. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock... a proposed highway project, Sunrise Project, I-205 to Rock Creek Junction, Clackamas County, Oregon..., NE., Suite 100, Salem, Oregon 97301, Telephone: (503) 587-4716. The Sunrise Project, I-205 to...

  4. 77 FR 71207 - Notice of Final Federal Agency Actions on Proposed Highway and Bridge in the Cities of Cincinnati...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway and Bridge in... bridge over the Ohio River in the City of Cincinnati, Hamilton County, State of Ohio and the City...

  5. 37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Reply by applicant or patent owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED... claims present in view of the state of the art disclosed by the references cited or the objections...

  6. 37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2012-07-01 2012-07-01 false Reply by applicant or patent owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED... claims present in view of the state of the art disclosed by the references cited or the objections...

  7. 37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2013-07-01 2013-07-01 false Reply by applicant or patent owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED... claims present in view of the state of the art disclosed by the references cited or the objections...

  8. 37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2014-07-01 2014-07-01 false Reply by applicant or patent owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED... claims present in view of the state of the art disclosed by the references cited or the objections...

  9. 78 FR 26739 - Notice of Final Action on Petition From Earthjustice To List Coal Mines as a Source Category and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... AGENCY 40 CFR Part 63 Notice of Final Action on Petition From Earthjustice To List Coal Mines as a Source Category and To Regulate Air Emissions From Coal Mines AGENCY: Environmental Protection Agency (EPA..., the Acting EPA Administrator, Bob Perciasepe, signed a letter denying a petition to add coal mines...

  10. 75 FR 53735 - Notice of Final Federal Agency Actions on East Lake Sammamish Master Plan Trail in King County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... [Federal Register Volume 75, Number 169 (Wednesday, September 1, 2010)] [Notices] [Pages 53735-53736] [FR Doc No: 2010-21804] DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on East Lake Sammamish Master Plan Trail in King County, WA AGENCY:...

  11. 24 CFR 180.700 - Action upon issuance of a final decision in Fair Housing Act cases.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Action upon issuance of a final decision in Fair Housing Act cases. 180.700 Section 180.700 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY,...

  12. 24 CFR 180.700 - Action upon issuance of a final decision in Fair Housing Act cases.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Action upon issuance of a final decision in Fair Housing Act cases. 180.700 Section 180.700 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY,...

  13. 24 CFR 180.700 - Action upon issuance of a final decision in Fair Housing Act cases.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action upon issuance of a final decision in Fair Housing Act cases. 180.700 Section 180.700 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY,...

  14. 24 CFR 180.700 - Action upon issuance of a final decision in Fair Housing Act cases.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Action upon issuance of a final decision in Fair Housing Act cases. 180.700 Section 180.700 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY,...

  15. 24 CFR 180.700 - Action upon issuance of a final decision in Fair Housing Act cases.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action upon issuance of a final decision in Fair Housing Act cases. 180.700 Section 180.700 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY,...

  16. 77 FR 66215 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York Correction In notice document 2012-26799, appearing on page 65929 in the...

  17. 78 FR 59754 - Notice of Final Federal Agency Actions on the Proposed U.S. 50 Study Crossing Over Sinepauxent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on the Proposed U.S. 50 Study Crossing Over Sinepauxent Bay in the Town of Ocean City, Worcester County, Maryland Correction In...

  18. 78 FR 26104 - Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Federal Highway Administration Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson County, OR AGENCY: Federal Highway Administration (FHWA), Department of..., Program Development Team Leader, Federal Highway Administration, 530 Center Street NE., Suite 420,...

  19. Inferences about Action Engage Action Systems

    ERIC Educational Resources Information Center

    Taylor, Lawrence J.; Lev-Ari, Shiri; Zwaan, Rolf A.

    2008-01-01

    Verbal descriptions of actions activate compatible motor responses [Glenberg, A. M., & Kaschak, M. P. (2002). Grounding language in action. "Psychonomic Bulletin & Review, 9", 558-565]. Previous studies have found that the motor processes for manual rotation are engaged in a direction-specific manner when a verb disambiguates the direction of…

  20. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    SciTech Connect

    Not Available

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

  1. UMTRA Surface Project management action process document. Final report: Revision 1

    SciTech Connect

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

  2. Shemya Air Force Base, Alaska No Further Action Decision document for Hg-1. Final report

    SciTech Connect

    Not Available

    1993-03-05

    This document is being prepared to document that a No Further Action Decision (NFAD) document is appropriate for the Hg-1 site at Shemya Air Force Base (AFB), Alaska, under the Air Force Installation Restoration Program (IRP). The IRP is a Department of Defense (DOD) program established to identify and remediate hazardous waste problems on DOD property that result from past practices. The Alaska Department of Environmental Conservation (ADEC) draft document {open_quotes}No Further Action Criteria for DOD Military/FUD Sites{close_quotes} has been used as a guide in preparing this document. Air Force personnel have stated that the Hg-1 site may have been used to store mercury and PCB-contaminated material. The site was added to the IRP in 1987, and later that year a field investigation was conducted at the site. Soil samples were collected and analyzed for mercury, EP toxicity, polychlorinated biphenyls (PCBs), and dioxin. All concentrations of contaminants found in Area Hg-1 are below regulatory action levels for PCBs (40 CFR 761) and mercury (55 FR 30798) or below detection levels for dioxin/furans. Therefore, leaving these soils in place is acceptable.

  3. Environmental assessment of remedial action at the Lowman Uranium Mill Tailings Site near Lowman, Idaho. Final

    SciTech Connect

    Not Available

    1991-01-01

    This document assesses the environmental impacts of stabilization on site of the contaminated materials at the Lowman uranium mill tailings site. The Lowman site is 0.5 road mile northeast of the unincorporated village of Lowman, Idaho, and 73 road miles from Boise, Idaho. The Lowman site consists of piles of radioactive sands, an ore storage area, abandoned mill buildings, and windblown/waterborne contaminated areas. A total of 29.5 acres of land are contaminated and most of this land occurs within the 35-acre designated site boundary. The proposed action is to stabilize the tailings and other contaminated materials on the site. A radon barrier would be constructed over the consolidated residual radioactive materials and various erosion control measures would be implemented to ensure the long-term stability of the disposal cell. Radioactive constituents and other hazardous constituents were not detected in the groundwater beneath the Lowman site. The groundwater beneath the disposal cell would not become contaminated during or after remedial action so the maximum concentration limits or background concentrations for the contaminants listed in the draft EPA groundwater protection standards would be met at the point of compliance. No significant impacts were identified as a result of the proposed remedial action at the Lowman site.

  4. Set Goals & Select Actions

    EPA Pesticide Factsheets

    This phase of the Local Climate Action Framework will help users articulate the goals for their climate, energy, and sustainability programs, as well as to identify the actions that are most appropriate to help meet those goals.

  5. American Lead Action Memorandum

    EPA Pesticide Factsheets

    ACTION MEMORANDUM— Request for a Time-Critical Removal Action andExemption from the $2 Million and 12-Month Statutory Limits at the AmericanLead Site, Indianapolis, Marion County, Indiana (Site ID #B56J)

  6. Action in Development

    ERIC Educational Resources Information Center

    von Hofsten, Claes

    2007-01-01

    It is argued that cognitive development has to be understood in the functional perspective provided by actions. Actions reflect all aspects of cognitive development including the motives of the child, the problems to be solved, and the constraints and possibilities of the child's body and sensorimotor system. Actions are directed into the future…

  7. Putting Action in Perspective

    ERIC Educational Resources Information Center

    Lozano, Sandra C.; Hard, Bridgette Martin; Tversky, Barbara

    2007-01-01

    Embodied approaches to cognition propose that our own actions influence our understanding of the world. Do other people's actions also have this influence? The present studies show that perceiving another person's actions changes the way people think about objects in a scene. In Study 1, participants viewed a photograph and answered a question…

  8. Action Learning at Work.

    ERIC Educational Resources Information Center

    Mumford, Alan, Ed.

    This book contains 34 papers examining the theory, process, and outcomes of action learning at work. The following papers are included: "An Introduction to the Text" (Alan Mumford); "The Learning Equation" (Reg Revans); "Action Learning as a Vehicle for Learning" (Alan Mumford); "Placing Action Learning and…

  9. Conservation Action Handbook.

    ERIC Educational Resources Information Center

    National Rifle Association, Washington, DC.

    Conservation problems are identified, with some suggestions for action. General areas covered are: Wildlife Conservation, Soil Conservation, Clean Water, Air Pollution Action, and Outdoor Recreation Action. Appendices list private organizations or agencies concerned with natural resource use and/or management, congressional committees considering…

  10. Planning as Action Research

    ERIC Educational Resources Information Center

    de Gonzalez, Carmen Beatriz; Hernandez, Teresa; Kusch, Jim; Ryan, Charly

    2004-01-01

    Planning contains so much more than the written plan. Early in 2000, an invitation came from the Collaborative Action Research Network (CARN), to people experienced in action research who might want to help plan and present an action research event for elementary school science teachers in Venezuela, South America, in Autumn 2000. This article…

  11. Participatory Action Research.

    ERIC Educational Resources Information Center

    Walker, Martha Lentz

    1993-01-01

    Describes aspects of participatory action research and considers advantages of using participatory action research in research by disabilities and rehabilitation researchers. Notes that participatory action research can be built into any rehabilitation research design but that it rests upon the recognition of persons with disabilities as integral…

  12. Interim final guidance package on funding CERCLA State-enforcement actions at NPL sites

    SciTech Connect

    Not Available

    1988-04-07

    The directive outlines requirements, conditions, and limitations for State funding under a CERCLA cooperative agreement of CERCLA enforcement actions at National Priorities List sites. The guidance is divided into four subcomponents: 9831.6 a, b, c, and d. The directive supersedes directive no. 9831.1-1a CERCLA Funding of State Oversight of Potentially Responsible Parties (PRPs), dated October 1, 1986, and directive no. 9831.3 dated October 1, 1986 CERCLA Funding of State Enforcement Activities at NPL Sites, - Interim Draft Guidance.

  13. Alternatives assessment other contamination sources, interim response action, shell section 36 trenches, RMA. Final report

    SciTech Connect

    1990-01-01

    This document describes the process and results of the alternatives assessment conducted for the Shell Section 36 trenches (site 36-3), approximately 31 trenches used from 1952 to 1966 for land disposal of liquid and solid wastes generated from pesticide manufacture. They have been shown to be a source of ground water contamination. A dense non-aqueous phase liquid (DNAPL) is also believed to have originated from the trenches. The assessment includes the following: (1) site characteristics. (2) discussion of alternative strategies and technologies, (3) evaluation of alternatives, and (4) conclusions. The preferred interim response action consists of a physical barrier encircling the trenches and a soil and vegetative cover.

  14. 77 FR 47517 - Enforcement Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... National Indian Gaming Commission 25 CFR Part 573 Enforcement Actions AGENCY: National Indian Gaming Commission. ACTION: Final rule. SUMMARY: The National Indian Gaming Commission (NIGC or Commission) is... INFORMATION CONTACT: Melissa Schlichting, National Indian Gaming Commission, 1441 L Street NW., Suite...

  15. Platform for Action: update.

    PubMed

    1995-01-01

    The Center for Women's Global Leadership (CWGL) has collaborated in the preparation of amendments and strategies designed to withstand the challenges being posed to the Platform for Action of the Fourth World Conference on Women. Specific challenges include the inappropriate use of the word "universal" to modify "human rights." This implies that some human rights are less than universal. The strategy proposed is to accept the use of the word "universal" in this context only when it affirms principles of universality contained in the Vienna Programme of Action and not where its use would restrict the rights to which women are entitled. A second concern is over the use of the word "equity" rather than "equality" when referring to gender relations. The use of these terms will be carefully monitored to insure that "equity" not be used to undermine the principle of gender equality. The third concern is the efforts of some governments to hinder the integration of women's human rights throughout the UN system. Such efforts will be opposed. Fourth, the CWGL will seek the inclusion of language which recognizes the barriers that different groups of women face when trying to secure their rights. Finally, the CWGL will propose inclusion of language recognizing and protecting sexual orientation rights. The CWGL is also going to work to translate the abstract language of the Platform for Action into political organizing potential to insure that governments will follow through on their agreements.

  16. Yakima Tributary Access and Habitat Program : Action Plan Final Report 2002.

    SciTech Connect

    Myra, David; Ready, Carol A.

    2003-04-01

    This report covers activities conducted by the Yakima Tributary Access and Habitat Program under Bonneville Power Administration (BPA) grant project No. 2002-025-00 for fiscal year 2002. The Yakima Tributary Access and Habitat Program (YTAHP, Program) was organized to restore salmonid passage to Yakima tributaries that historically supported salmonids and improve habitat in areas where access is restored. Specifically, this program is designed to (a) screen unscreened diversion structures to prevent fish entrainment into artificial waterways; (b) provide for fish passage at man-made barriers, such as diversion dams, culverts, siphons and bridges; and (c) provide information and assistance to landowners interested in to contributing to the improvement of water quality, water reliability and stream habitat. The YTAHP developed from a number of groups actively engaged in watershed management, and/or habitat restoration within the Yakima River Basin. These groups include the Washington State Fish and Wildlife (WDFW), Kittitas County Conservation District (KCCD), North Yakima Conservation District (NYCD), Kittitas County Water Purveyors (KCWP), and Ahtanum Irrigation District (AID). The US Bureau of Reclamation (Reclamation) and Yakama Nation (YN) both participated in the development of the objectives of YTAHP. Other entities that will be involved during permitting or project review may include the YN, the federal Natural Resources Conservation Service (NRCS), the US Fish and Wildlife Service (USFWS), the National Marine Fisheries Service (NMFS), and US Army Corps of Engineers (COE). Achievements of YTAHP with BPA Action Plan funding during FY 2002 were to: (1) Establish contracts with RC&D and YTAHP participants. (2) Determine contract mechanism for MWH engineering services. (3) Provide engineering designs and services for 11 early action projects, including inverted siphons, pump and gravity diversion screening, diversion metering, rock weirs for improved fish passage

  17. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site near Gunnison, Colorado. Final

    SciTech Connect

    Not Available

    1992-02-01

    The presence of contaminated uranium mill tailings adjacent to the city of Gunnison has been a local concern for many years. The following issues were identified during public meetings that were held by the DOE prior to distribution of an earlier version of this EA. Many of these issues will require mitigation. Groundwater contamination; in December 1989, a herd of 105 antelope were introduced in an area that includes the Landfill disposal site. There is concern that remedial action-related traffic in the area would result in antelope mortality. The proposed Tenderfoot Mountain haul road may restrict antelope access to their water supply; a second wildlife issue concerns the potential reduction in sage grouse use of breeding grounds (leks) and nesting habitat; the proposed Tenderfoot Mountain haul road would cross areas designated as wetlands by US Army Corps of Engineers (COE); the proposed disposal site is currently used for grazing by cattle six weeks a year in the spring. Additional concerns were stated in comments on a previous version of this EA. The proposed action is to consolidate and remove all contaminated materials associated with the Gunnison processing site to the Landfill disposal site six air miles east of Gunnison. All structures on the site (e.g., water tower, office buildings) were demolished in 1991. The debris is being stored on the site until it can be incorporated into the disposal cell at the disposal site. All contaminated materials would be trucked to the Landfill disposal site on a to-be-constructed haul road that crosses BLM-administered land.

  18. National Biofuels Action Plan

    DTIC Science & Technology

    2008-10-01

    Leading the Federal Interagency Biomass Research and Development Initiative October 2008 National Biofuels Action Plan Biomass Research and...REPORT DATE OCT 2008 2. REPORT TYPE 3. DATES COVERED 00-00-2008 to 00-00-2008 4. TITLE AND SUBTITLE National Biofuels Action Plan 5a. CONTRACT...goal of the National Biofuels Action Plan is to maximize the environmental and economic benefi ts of biofuels use by advancing sustainable practices

  19. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    SciTech Connect

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  20. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Appendix D. Final report

    SciTech Connect

    1988-07-01

    This appendix is an assessment of the present conditions of the inactive uranium mill site near Mexican Hat, Utah. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan. Plan is to characterize the conditions at the mill and tailings site so that the Remedial Action Contractor may complete final designs of the remedial action.

  1. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect

    D. Vandel

    2003-09-01

    This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

  2. Stereoscopically Observing Manipulative Actions

    PubMed Central

    Ferri, S.; Pauwels, K.; Rizzolatti, G.; Orban, G. A.

    2016-01-01

    The purpose of this study was to investigate the contribution of stereopsis to the processing of observed manipulative actions. To this end, we first combined the factors “stimulus type” (action, static control, and dynamic control), “stereopsis” (present, absent) and “viewpoint” (frontal, lateral) into a single design. Four sites in premotor, retro-insular (2) and parietal cortex operated specifically when actions were viewed stereoscopically and frontally. A second experiment clarified that the stereo-action-specific regions were driven by actions moving out of the frontoparallel plane, an effect amplified by frontal viewing in premotor cortex. Analysis of single voxels and their discriminatory power showed that the representation of action in the stereo-action-specific areas was more accurate when stereopsis was active. Further analyses showed that the 4 stereo-action-specific sites form a closed network converging onto the premotor node, which connects to parietal and occipitotemporal regions outside the network. Several of the specific sites are known to process vestibular signals, suggesting that the network combines observed actions in peripersonal space with gravitational signals. These findings have wider implications for the function of premotor cortex and the role of stereopsis in human behavior. PMID:27252350

  3. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final

    SciTech Connect

    Not Available

    1994-03-01

    This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

  4. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    SciTech Connect

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

  5. Setting priorities for action plans at Los Alamos National Laboratory. Final report

    SciTech Connect

    Miller, A.C.

    1992-09-30

    This report summarizes work done by Applied Decision Analysis (ADA) for Los Alamos National Laboratory (LANL) under Subcontract Number 9-XQ2-Y3837-1 with the University of California. The purpose of this work was to develop a method of setting priorities for environmental, safety, and health (ES&H) deficiencies at Los Alamos. The deficiencies were identified by a DOE Tiger Team that visited LANL in the fall of 1991, and by self assessments done by the Laboratory. ADA did the work described here between October 1991 and the end of September 1992. The ADA staff working on this project became part of a Risk Management Team in the Laboratory`s Integration and Coordination Office (ICO). During the project, the Risk Management Team produced a variety of documents describing aspects of the action-plan prioritization system. Some of those documents are attached to this report. Rather than attempt to duplicate their contents, this report provides a guide to those documents, and references them whenever appropriate.

  6. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report. Revised final report

    SciTech Connect

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose. First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.

  7. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Remedial action selection report, Attachment 2, Geology report: Preliminary final

    SciTech Connect

    Not Available

    1993-08-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this document and the rest of the RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the State of Colorado.

  8. Comment and response document for the final remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Revision 2

    SciTech Connect

    1996-05-01

    This document for the final remedial action plan and site design has been prepared for US Department of Energy Environmental Restoration Division as part of the Uranium Mill Tailings Remedial Action plan. Comments and responses are included for the site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado.

  9. Superfund record of decision (EPA Region 1): Town Garage Radio Beacon, Londonderry, NH. (First remedial action), September 1992. Final report

    SciTech Connect

    Not Available

    1992-09-30

    The Town Garage Radio Beacon, NH, site includes the Holton Circle residential development of 23 homes, a town garage area, and an undeveloped hillslope and wetlands area in Londonderry, New Hampshire. From 1940 to 1968, the area was owned by the Department of Defense (DOD), who reportedly used it as a radio beacon facility from 1940 to 1947. The ROD provides a final remedy for the contaminated onsite ground water. No further remedial actions are anticipated for the site. The primary contaminants affecting the ground water are VOCs; and metals, including chromium.

  10. Action Learning in China

    ERIC Educational Resources Information Center

    Marquardt, Michael J.

    2015-01-01

    Action learning was introduced into China less than 20 years ago, but has rapidly become a valuable tool for organizations seeking to solve problems, develop their leaders, and become learning organizations. This article provides an historical overview of action learning in China, its cultural underpinnings, and five case studies. It concludes…

  11. Who Needs Affirmative Action.

    ERIC Educational Resources Information Center

    Ginger, Ann Fagan

    1979-01-01

    Affirmative action and reverse discrimination are discussed. Facts that were omitted from the court record on the Bakke case are examined. The need for encouraging minority students and women to continue to press for school admission and for lawyers to continue to press affirmative action suits is stressed. (MC)

  12. Renormalized action improvements

    SciTech Connect

    Zachos, C.

    1984-01-01

    Finite lattice spacing artifacts are suppressed on the renormalized actions. The renormalized action trajectories of SU(N) lattice gauge theories are considered from the standpoint of the Migdal-Kadanoff approximation. The minor renormalized trajectories which involve representations invariant under the center are discussed and quantified. 17 references.

  13. Training for Nonviolent Action.

    ERIC Educational Resources Information Center

    Olson, Theodore W.; Shivers, Lynne

    The theory and practice of nonviolent action training as it exists to date are reviewed in this pamphlet. A response to a renewal of interest in alternative forms of social action, the pamphlet results specifically from an international seminar of experienced organizers and trainers held at Preston Patrick, Westmorland, England, June 27 - July 2,…

  14. Affirmative Action Program Manual.

    ERIC Educational Resources Information Center

    Ventura County Community Coll. District, CA.

    Guidelines relating to the affirmative action program of the Ventura County Community College District are provided in this manual. Affirmative action is defined as, "A set of specific and result-oriented procedures to which a contractor commits himself/herself to apply every good faith effort. The objective of those procedures, plus such efforts,…

  15. 25 Action Learning Schools.

    ERIC Educational Resources Information Center

    National Association of Secondary School Principals, Reston, VA.

    This booklet on action-learning reflects an interest in preparing youth for the world of real experiences. Arranged in two major parts, the first offers information on the background and development of action-learning. Included in this section are the conclusions of the Panel on Youth of the President's Science Advisory Committee, the National…

  16. ACTION. 1977 Annual Report.

    ERIC Educational Resources Information Center

    ACTION, Washington, DC.

    In this report are described projects and activities undertaken by ACTION's volunteer programs in 1977. The first section concentrates on reviews conducted, including a major review of ACTION's domestic volunteer programs and the management systems supporting them and an assessment of its programs using the Zero-Base Budget approach called for by…

  17. Action Learning and Leadership.

    ERIC Educational Resources Information Center

    Marquardt, Michael J.

    2000-01-01

    Today's leaders perform the following roles: systems thinker, change agent, innovator, servant, polychronic coordinator, teacher-mentor, and visionary. The elements of action learning (real problems, teams, reflective inquiry, commitment to action, focus on learning) contribute to the development of these critical skills. (Author/SK)

  18. Handbook for Ecology Action.

    ERIC Educational Resources Information Center

    Eber, Ronald

    This handbook has been compiled to aid concerned individuals and ecology groups more adequately define their goals, initiate good programs, and take effective action. It examines the ways a group of working individuals can become involved in action programs for ecological change. Part 1 deals with organization, preliminary organizing, structuring,…

  19. Conscious Vision in Action.

    PubMed

    Briscoe, Robert; Schwenkler, John

    2015-09-01

    It is natural to assume that the fine-grained and highly accurate spatial information present in visual experience is often used to guide our bodily actions. Yet this assumption has been challenged by proponents of the Two Visual Systems Hypothesis (TVSH), according to which visuomotor programming is the responsibility of a "zombie" processing stream whose sources of bottom-up spatial information are entirely non-conscious (Clark, 2007, 2009; Goodale & Milner, 1992, 2004a; Milner & Goodale, 1995/2006, 2008). In many formulations of TVSH, the role of conscious vision in action is limited to "recognizing objects, selecting targets for action, and determining what kinds of action, broadly speaking, to perform" (Clark, 2007, p. 570). Our aim in this study is to show that the available evidence not only fails to support this dichotomous view but actually reveals a significant role for conscious vision in motor programming, especially for actions that require deliberate attention.

  20. Supergravity actions with integral forms

    NASA Astrophysics Data System (ADS)

    Castellani, L.; Catenacci, R.; Grassi, P. A.

    2014-12-01

    Integral forms provide a natural and powerful tool for the construction of supergravity actions. They are generalizations of usual differential forms and are needed for a consistent theory of integration on supermanifolds. The group geometrical approach to supergravity and its variational principle are reformulated and clarified in this language. Central in our analysis is the Poincaré dual of a bosonic manifold embedded into a supermanifold. Finally, using integral forms we provide a proof of Gates' so-called "Ectoplasmic Integration Theorem", relating superfield actions to component actions.

  1. Comment and response document on the final remedial action plan and site design for stabilization of the inactive Uranium Mill Tailings Site at Lakeview, Oregon

    SciTech Connect

    Not Available

    1991-10-01

    This report contains comments provided by the Oregon Department of Energy and responses to these comments on the final remedial action plan for the inactive uranium mill tailings site at Lakeview, Oregon.

  2. Topological lattice actions

    NASA Astrophysics Data System (ADS)

    Bietenholz, W.; Gerber, U.; Pepe, M.; Wiese, U.-J.

    2010-12-01

    We consider lattice field theories with topological actions, which are invariant against small deformations of the fields. Some of these actions have infinite barriers separating different topological sectors. Topological actions do not have the correct classical continuum limit and they cannot be treated using perturbation theory, but they still yield the correct quantum continuum limit. To show this, we present analytic studies of the 1-d O(2) and O(3) model, as well as Monte Carlo simulations of the 2-d O(3) model using topological lattice actions. Some topological actions obey and others violate a lattice Schwarz inequality between the action and the topological charge Q. Irrespective of this, in the 2-d O(3) model the topological susceptibility {χ_t} = {{{left< {{Q^2}} rightrangle }} left/ {V} right.} is logarithmically divergent in the continuum limit. Still, at non-zero distance the correlator of the topological charge density has a finite continuum limit which is consistent with analytic predictions. Our study shows explicitly that some classically important features of an action are irrelevant for reaching the correct quantum continuum limit.

  3. Testing fractional action cosmology

    NASA Astrophysics Data System (ADS)

    Shchigolev, V. K.

    2016-08-01

    The present work deals with a combined test of the so-called Fractional Action Cosmology (FAC) on the example of a specific model obtained by the author earlier. In this model, the effective cosmological term is proportional to the Hubble parameter squared through the so-called kinematic induction. The reason of studying this cosmological model could be explained by its ability to describe two periods of accelerated expansion, that is in agreement with the recent observations and the cosmological inflation paradigm. First of all, we put our model through the theoretical tests, which gives a general conception of the influence of the model parameters on its behavior. Then, we obtain some restrictions on the principal parameters of the model, including the fractional index, by means of the observational data. Finally, the cosmography parameters and the observational data compared to the theoretical predictions are presented both analytically and graphically.

  4. Spacelike brane actions.

    PubMed

    Hashimoto, Koji; Ho, Pei-Ming; Wang, John E

    2003-04-11

    We derive effective actions for "spacelike branes" (S-branes) and find a solution describing the formation of fundamental strings in the rolling tachyon background. The S-brane action is a Dirac-Born-Infeld action for Euclidean world volumes defined in the context of time-dependent tachyon condensation of non-BPS (Bogomol'nyi-Prasad-Sommerfield) branes. It includes gauge fields and, in particular, a scalar field associated with translation along the time direction. We show that the BIon spike solutions constructed in this system correspond to the production of a confined electric flux tube (a fundamental string) at late time of the rolling tachyon.

  5. Conscious Control over Action.

    PubMed

    Shepherd, Joshua

    2015-06-01

    The extensive involvement of nonconscious processes in human behaviour has led some to suggest that consciousness is much less important for the control of action than we might think. In this article I push against this trend, developing an understanding of conscious control that is sensitive to our best models of overt (that is, bodily) action control. Further, I assess the cogency of various zombie challenges-challenges that seek to demote the importance of conscious control for human agency. I argue that though nonconscious contributions to action control are evidently robust, these challenges are overblown.

  6. Conscious Control over Action

    PubMed Central

    Shepherd, Joshua

    2015-01-01

    The extensive involvement of nonconscious processes in human behaviour has led some to suggest that consciousness is much less important for the control of action than we might think. In this article I push against this trend, developing an understanding of conscious control that is sensitive to our best models of overt (that is, bodily) action control. Further, I assess the cogency of various zombie challenges—challenges that seek to demote the importance of conscious control for human agency. I argue that though nonconscious contributions to action control are evidently robust, these challenges are overblown. PMID:26113753

  7. 77 FR 14857 - Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ..., Federal Highway Administration, 310 New Bern Avenue, Suite 410, Raleigh, North Carolina, 27601-1418... South Wilmington Street, Raleigh, North Carolina, 27601. A final decision regarding section 404...

  8. 78 FR 23630 - Notice of Final Federal Agency Actions on State Highway 99 (Segment C) in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    .... 1251- 1342; Land and Water Conservation Fund (LWCF), 16 U.S.C. 4601-4604. 8. Executive Orders: E.O... Texas AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for...) to SH 288 in Fort Bend and Brazoria Counties, Texas. Those actions grant licenses, permits,...

  9. 76 FR 68810 - Notice of Final Federal Agency Actions on Farm-to-Market 1626 in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    .... 1251- 1342]; Land and Water Conservation Fund (LWCF) [16 U.S.C. 4601-4604]. 8. Executive Orders: E.O... Federal Agency Actions on Farm-to-Market 1626 in Texas AGENCY: Federal Highway Administration (FHWA), DOT..., Texas. Those actions grant licenses, permits, and approvals for the project. DATES: By this notice,...

  10. 76 FR 26336 - Notice of Final Federal Agency Actions on the Proposed Klingle Valley Trail in Washington, DC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... in Washington, DC AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on...)(1). The actions relate to the proposed Klingle Valley Trail project in Northwest Washington, DC.../Urban Engineer, 1990 K Street, NW., Suite 510, Washington, DC 20006-1103, (202) 219-3536; or...

  11. Stabilizing bottomless action theories

    NASA Astrophysics Data System (ADS)

    Greensite, J.; Halpern, M. B.

    1984-08-01

    We show how to construct the euclidean quantum theory corresponding to classical actions which are unbounded from below. Our method preserves the classical limit, the large- N limit, and the perturbative expansion of the unstabilized theories.

  12. Benzidine Dyes Action Plan

    EPA Pesticide Factsheets

    This Action Plan addresses the use of benzidine-based dyes and benzidine congener-based dyes, both metalized and non-metalized, in products that would result in consumer exposure, such as for use to color textiles.

  13. Oak Canyon Action Memo

    EPA Pesticide Factsheets

    This memorandum requests approval for a time-critical removal action at the 27 residential properties that compose the Oak Canyon Site located in the Village of Paguate, Pueblo of Laguna, near Cibola County, New Mexico.

  14. Final Environmental Assessment of remedial action at the Falls City uranium mill tailings site, Falls City, Texas

    SciTech Connect

    Not Available

    1991-12-01

    This environmental assessment (EA) is prepared pursuant to the National Environmental Policy Act (NEPA), which requires Federal agencies to assess the impacts that their actions may have on the environment. This EA examines the short- and long-term effects of the DOE`s proposed remedial action for the Falls City tailings site. The no action alternative is also examined. The DOE will use the information and analyses presented here to determine whether the proposed action would have a significant impact on the environment. If the impacts are determined to be significant, an EIS will be prepared. If the impacts are not judged to be significant, the DOE will issue an official ``Finding of No Significant Impact`` and implement the proposed action.

  15. Cardiac action potential imaging

    NASA Astrophysics Data System (ADS)

    Tian, Qinghai; Lipp, Peter; Kaestner, Lars

    2013-06-01

    Action potentials in cardiac myocytes have durations in the order of magnitude of 100 milliseconds. In biomedical investigations the documentation of the occurrence of action potentials is often not sufficient, but a recording of the shape of an action potential allows a functional estimation of several molecular players. Therefore a temporal resolution of around 500 images per second is compulsory. In the past such measurements have been performed with photometric approaches limiting the measurement to one cell at a time. In contrast, imaging allows reading out several cells at a time with additional spatial information. Recent developments in camera technologies allow the acquisition with the required speed and sensitivity. We performed action potential imaging on isolated adult cardiomyocytes of guinea pigs utilizing the fluorescent membrane potential sensor di-8-ANEPPS and latest electron-multiplication CCD as well as scientific CMOS cameras of several manufacturers. Furthermore, we characterized the signal to noise ratio of action potential signals of varying sets of cameras, dye concentrations and objective lenses. We ensured that di-8-ANEPPS itself did not alter action potentials by avoiding concentrations above 5 μM. Based on these results we can conclude that imaging is a reliable method to read out action potentials. Compared to conventional current-clamp experiments, this optical approach allows a much higher throughput and due to its contact free concept leaving the cell to a much higher degree undisturbed. Action potential imaging based on isolated adult cardiomyocytes can be utilized in pharmacological cardiac safety screens bearing numerous advantages over approaches based on heterologous expression of hERG channels in cell lines.

  16. [Addictions and action systems].

    PubMed

    Loonis, E; Apter, M J

    2000-01-01

    Generalizing from some previous analyses of addiction, and introducing the concept of an action system which governs all actions which are focussed on what Brown (1988) calls "hedonic management", we argue that addictions of every kind involve an action system that displays high salience, low variety and low vicariance. Addictions also involve what Apter (1982) calls the "paratelic state". A study was carried out comparing 31 drug addicts with 29 control subjects in terms of action system variables. To measure these variables, we constructed a new instrument, the Activity-System Drawing Test, and also used the Telic Dominance Scale to measure frequency of paratelic states. Dysphoria was measured by means of the BATE (anxiety), IDA-13 (depression), SEI (self-esteem), and TAS-20 (alexithymia) instruments. Strongly significant differences were found between groups for both action system variables and dysphoria, and there were also strong correlations between both groups of variables. This supports the idea that addictions emerge from systemic properties of the action system.

  17. Antisymmetric string actions

    NASA Astrophysics Data System (ADS)

    Aragone, C.

    1986-12-01

    An action is presented for the free bosonic string on external flat space in terms of an antisymmetric second-rank string background tensor which is classically equivalent to the Nambu-Goto action. Both action and field equations are entirely described in terms of 2D world-sheet forms, without any reference to a 2D metric tensor background. The analysis of its canonical formulation shows how the quadratic Virasoro constraints are generated in this case and what their connection with the Bianchi identities are. Since in the orthonormal gauge the reduced action coincides with the standard one, it has the same critical dimension D = 26. The existence of an interaction term of a purely geometric structure stemming in the extrinsic curvature is pointed out. Its action and the new string field equations are then derived. This polynomial antisymmetric string action is uniformly generalized in order to describe d < D-dimensional extended objects in D-dimensional flat space. On leave of absence from Departamento de Física, Universidad Simon Bolívar, Apartado 80659, Caracas 1080A, Venezuela.

  18. 76 FR 16653 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... were taken, are described in the Final Environmental Assessment (FEA) for the project, approved via... FHWA project records. The FEA, FONSI, and other project records are available by contacting Caltrans...

  19. 42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for... Withdrawal of Approval of an Accreditation Body § 8.34 Court review of final administrative...

  20. 42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for... Withdrawal of Approval of an Accreditation Body § 8.34 Court review of final administrative...

  1. 75 FR 28317 - Notice of Final Federal Agency Actions on Proposed Highways in Michigan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-20

    ... Environmental Protection Policy Act of 1969 (NEPA), 42 U.S.C. 4321, as amended and the Council on Environmental... shorter time period still applies. FOR FURTHER INFORMATION CONTACT: Mr. David Williams, Environmental... were taken, are described in the Final Environmental Impact Statement for the project approved...

  2. Sunset Dates of Chemicals Subject to Final TSCA Section 4 and Related 12(b) Actions

    EPA Pesticide Factsheets

    This Table lists, in ascending chemical Abstract Service (CAS) Registry number order, all chemical substances and mixtures that are and/or have been the subject of final TSCA Section 4 test rules and/or TSCA Section 4 enforceable consent agreements/orders.

  3. 75 FR 58016 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... in the Final Environmental Assessment (FEA) and Finding of No Significant Impact (FONSI) for the project, both approved on July 30, 2010, and in other documents in Caltrans project records. The FEA, and... address provided above. The FEA can be viewed and downloaded from the project Web site at...

  4. 76 FR 54529 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... were taken, are described in the Final Environmental Assessment (FEA) for the project. A Finding of No Significant Impact (FONSI) was approved on July 8, 2011. The FEA, FONSI, and other project records are available by contacting Caltrans at the addresses provided above. The Caltrans FEA and FONSI can be...

  5. Interim response action, basin F liquid incineration project. Draft final human health assessment. Volume 1

    SciTech Connect

    1993-09-02

    The multipathway human health risk assessment based on the SQ1 emission rates measured during the trial burn of basin F liquid indicates that the maximum level of human health risk associated with operation of this incinerator will not exceed the benchmark risk levels defined in the final decision document (Woodward-Clyde, 1990).

  6. Plan for early action: Recommendations

    SciTech Connect

    1998-12-31

    This report contains recommendations on the implementation of an action plan to reduce or recapture greenhouse gas (GHG) emissions in British Columbia. The report includes the consensus recommendations of the BC Greenhouse Gas Forum, as well as those items on which Forum participants have agreed to disagree, plus the reasons for those differences. The recommendations include: Umbrella actions which may affect several or all sectors of the economy, or support the success of other actions; actions to reduce vehicle kilometers travelled; actions to increase vehicle efficiency or increase the use of alternative fuels or technologies; actions to decrease GHG emissions from energy production; actions to increase end-use energy efficiency; and actions to reduce non-energy-related emissions. Appendices include work sheets on each action, with a description of the action and information on the action`s rationale, experience elsewhere, related policy initiatives, and key issues regarding feasibility and implementation.

  7. What's an Asthma Action Plan?

    MedlinePlus

    ... to 2-Year-Old What's an Asthma Action Plan? KidsHealth > For Parents > What's an Asthma Action Plan? ... normal everyday activities without having asthma symptoms. Action Plans Are Unique Each person's experience with asthma is ...

  8. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  9. Superfund record of decision (EPA Region 5): Peerless Plating, Muskegon Township, MI. (First remedial action), September 1992. Final report

    SciTech Connect

    Not Available

    1992-09-21

    The 1-acre Peerless Plating site is a former electroplating facility in Muskegon Township, Michigan, and is located northwest of Little Black Creek and 1 mile north of Mona Lake. Lake Michigan supplies drinking water for residential and commercial businesses within a 3-mile radius of the site. From 1937 to 1983, onsite electroplating operations and processes included copper, nickel, chromium, cadmium, and zinc plating, in addition to burnishing, polishing, pickling, oiling, passivating, stress relieving, and dichromate dipping. In the 1970s, the state directed Peerless Plating to monitor waste discharge daily and to install a treatment system to meet reduced effluent limitations. The site violated the requirements and was charged by the state. The ROD addresses the onsite contaminated soil and ground water as a final remedy. The primary contaminants of concern are VOCs, including benzene, TCE, toluene, and xylenes; metals, including arsenic, chromium, and lead; and inorganics, including cyanide. The selected remedial action for the site are included.

  10. Superfund Record of Decision (EPA Region 1): Stamina Mills site, North Smithfield, RI. (First remedial action), September 1990. Final report

    SciTech Connect

    Not Available

    1990-09-28

    The five-acre Stamina Mills site is a former textile weaving and finishing facility in North Smithfield, Providence County, Rhode Island. A portion of the site is within the 100-year floodplain and wetland area of the Branch River. The manufacturing process used cleaning solvents, acids, bases and dyes for coloring, pesticides for moth proofing, and plasticizers to coat fabrics. Mill process wastes were placed in a landfill onsite. EPA initiated three removal actions from 1984 to 1990, including an extension of the municipal water supply to residents obtaining water from the affected aquifer; and treatment of two underground and one above-ground storage tanks, followed by offsite disposal. The Record of Decision (ROD) provides a final remedy and addresses both source control and management of contaminated ground water migration at the site. The primary contaminants of concern affecting the soil, debris, sediment, and ground water are VOCs including TCE and PCE; other organics including pesticides; and metals including chromium.

  11. Classifying Facial Actions

    PubMed Central

    Donato, Gianluca; Bartlett, Marian Stewart; Hager, Joseph C.; Ekman, Paul; Sejnowski, Terrence J.

    2010-01-01

    The Facial Action Coding System (FACS) [23] is an objective method for quantifying facial movement in terms of component actions. This system is widely used in behavioral investigations of emotion, cognitive processes, and social interaction. The coding is presently performed by highly trained human experts. This paper explores and compares techniques for automatically recognizing facial actions in sequences of images. These techniques include analysis of facial motion through estimation of optical flow; holistic spatial analysis, such as principal component analysis, independent component analysis, local feature analysis, and linear discriminant analysis; and methods based on the outputs of local filters, such as Gabor wavelet representations and local principal components. Performance of these systems is compared to naive and expert human subjects. Best performances were obtained using the Gabor wavelet representation and the independent component representation, both of which achieved 96 percent accuracy for classifying 12 facial actions of the upper and lower face. The results provide converging evidence for the importance of using local filters, high spatial frequencies, and statistical independence for classifying facial actions. PMID:21188284

  12. ES H action plan

    SciTech Connect

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  13. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    SciTech Connect

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  14. Retaliation to a chemical attack in a major regional conflict: Courses of action and consequences. Final report

    SciTech Connect

    Crabbe, J.A.

    1996-02-12

    How should the Operational Commander address retaliation to chemical warfare in his deliberate planning process. Joint Doctrine and the Gulf War appear to indicate that nuclear weapons form the basis for an appropriate retaliation course of action. However, Nuclear Posture statements, policy discussions, and military engagement post facto revelations tend to minimize the employment probability of nuclear weapons. Nuclear weapons do not present viable courses of action around which an executable plan can be built. However, conventional courses of action do, through analysis of chemical weapons, current policy and doctrine, nuclear employment probability, and regional perspectives, conventional courses of action surface as the politically and militarily supportable basis for planning. In addition to being a credible deterrent, employment in a retaliatory mode is not likely to ignite the global political maelstrom incidental to instigating the potential for nuclear war.

  15. Action languages: Dimensions, effects

    NASA Technical Reports Server (NTRS)

    Hayes, Daniel G.; Streeter, Gordon

    1989-01-01

    Dimensions of action languages are discussed for communication between humans and machines, and the message handling capabilities of object oriented programming systems are examined. Design of action languages is seen to be very contextual. Economical and effective design will depend on features of situations, the tasks intended to be accomplished, and the nature of the devices themselves. Current object oriented systems turn out to have fairly simple and straightforward message handling facilities, which in themselves do little to buffer action or even in some cases to handle competing messages. Even so, it is possible to program a certain amount of discretion about how they react to messages. Such thoughtfulness and perhaps relative autonomy of program modules seems prerequisite to future systems to handle complex interactions in changing situations.

  16. Mitigation Action Plan

    SciTech Connect

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  17. Characterizations of proper actions

    NASA Astrophysics Data System (ADS)

    Biller, Harald

    2004-03-01

    Three kinds of proper actions of increasing strength are defined. We prove that the three definitions specialize to the definitions by Bourbaki, by Palais and by Baum, Connes and Higson in their respective settings. The third of these, which thus turns out to be the strongest, originally only concerns actions of second countable locally compact groups on metrizable spaces. In this situation, it is shown to coincide with the other two definitions if the total space locally has the Lindelöf property and the orbit space is regular.

  18. Mobilizing grassroots action.

    PubMed

    1995-01-01

    Zero Population Growth, Inc. (ZPG), was very busy in 1994 spreading its message about the dangers of rapid population growth. ZPG's Field and Outreach Program is vital to the success of the organization. Organization activists staffed tables at more than 170 events in 1994, while the Speakers Network gave 159 presentations. ZPG was represented on Earth Day, World Population Day, during World Population Awareness Week, and at Cairo town meetings, as well as at the HORDE rock festival and the 25th anniversary of the Woodstock Music Festival. Campus contacts developed at these latter two concerts formed the basic for ZPG's Campus Outreach Project. In 1994, the Field department focused upon the International Conference on Population and Development to be held in Cairo, Egypt. ZPG encouraged people to get involved in conference preparations by helping to plan and implement town meetings in eleven major US cities. Members were contacted by ZPG via flyers and phone calls about meetings in their areas. ZPG activists and chapters then provided leadership for many of the meetings which drew thousands of participants and were widely praised by national leaders. Throughout 1994, ZPG's 21 chapters provided members with a vehicle for collective action and a source of information about the population conference, population growth, and wasteful consumption. Chapter activists also helped secure the signatures of thousands of people on Population Priority Petitions; the final list of names was delivered to US Vice President Al Gore in November.

  19. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    SciTech Connect

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  20. Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

    SciTech Connect

    Jeremy Gwin and Douglas Frenette

    2010-09-30

    This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values and corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room

  1. Angels in Action

    ERIC Educational Resources Information Center

    Stylianou, Xanthippi Cynthia

    2009-01-01

    In this article, the author discusses the importance of the placement of action lines to show the direction of movement. The author shows some visuals of angels and discusses in details the texture of the wings, the hair and the clothing.

  2. Executive Mind, Timely Action.

    ERIC Educational Resources Information Center

    Torbert, William R.

    1983-01-01

    The idea of "Executive Mind" carries with it the notion of purposeful and effective action. Part I of this paper characterizes three complements to "Executive Mind"--"Observing Mind,""Theorizing Mind," and "Passionate Mind"--and offers historical figures exemplifying all four types. The concluding…

  3. College Comedy and Action

    ERIC Educational Resources Information Center

    Moore, Rosanna

    1977-01-01

    A few materials such as yarn and scraps of paper and cloth can provide the media for recording limitless ideas from the imaginations of students. With a little encouragement and a few suggestions of actions, emotions, exaggerations and activities students will produce a vast array of amusing characters. (Author)

  4. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    In order to develop an affirmative action plan at Triton College, the college President appointed a committee made up of nine representatives from the various college constituencies, the majority of which were women and minorities, to determine the objectives to be achieved and how to implement them, and to establish appropriate review procedures.…

  5. Youth Engaged for Action

    ERIC Educational Resources Information Center

    Post, Margaret; Little, Priscilla

    2005-01-01

    This article examines how out-of-school time programs can promote youth involvement in civic action by focusing on four interrelated programmatic strategies: establishing organizational readiness that fosters engagement; promoting youth-adult partnerships; engaging youth as leaders and decision makers; and involving youth in research and…

  6. Expert Teacher Action Program.

    ERIC Educational Resources Information Center

    Washington, Eva

    The expert teacher action program is to improve classroom teaching performance. The program has been tested in workshop sessions involving more than 1,200 educators representing 50 school districts. A set of standards, consisting of 25 variables, lead to the definition of expert teaching. Each variable deals with a major aspect of the duties of…

  7. Court Action for Migrants.

    ERIC Educational Resources Information Center

    Ewald, Thomas R.

    Aiding attorneys who represent migrant farmworkers and their families when affirmative civil action is required, this book helps to raise the level of migrants' legal protection to a minimum standard of adequacy. The text is based on the Federal Rules of Civil Procedure, a national set of rules. The book is divided into 3 sections: the…

  8. Action for Children's Television.

    ERIC Educational Resources Information Center

    Ranly, Donald P.

    The origins, development, and effectiveness of Action for Children's Television (ACT) are examined in this pamphlet. The strategies used by ACT to obtain change at the congressional level and within television stations and networks include the following: a "tuneout" day when people are urged to turn off their television sets, a boycott…

  9. School Reform in Action.

    ERIC Educational Resources Information Center

    Miller, A. Christine

    This study describes and analyzes the impact on student learning and the learning environment of 55 schools in Broward, Palm Beach, and Miami-Dade school districts as they implemented the schoolwide action-research framework for school improvement. Interviews, observations, document review during site visits, school framework reports, surveys,…

  10. Cognitive framing in action.

    PubMed

    Huhn, John M; Potts, Cory Adam; Rosenbaum, David A

    2016-06-01

    Cognitive framing effects have been widely reported in higher-level decision-making and have been ascribed to rules of thumb for quick thinking. No such demonstrations have been reported for physical action, as far as we know, but they would be expected if cognition for physical action is fundamentally similar to cognition for higher-level decision-making. To test for such effects, we asked participants to reach for a horizontally-oriented pipe to move it from one height to another while turning the pipe 180° to bring one end (the "business end") to a target on the left or right. From a physical perspective, participants could have always rotated the pipe in the same angular direction no matter which end was the business end; a given participant could have always turned the pipe clockwise or counter-clockwise. Instead, our participants turned the business end counter-clockwise for left targets and clockwise for right targets. Thus, the way the identical physical task was framed altered the way it was performed. This finding is consistent with the hypothesis that cognition for physical action is fundamentally similar to cognition for higher-level decision-making. A tantalizing possibility is that higher-level decision heuristics have roots in the control of physical action, a hypothesis that accords with embodied views of cognition.

  11. Nutrition Action Pack.

    ERIC Educational Resources Information Center

    Sockut, Joanne; Stumpe, Stephanie

    One of five McDonald's Action Packs, these instructional materials integrate elementary school-level nutrition education into other disciplines--biology, sociology, physiology, mathematics, and art. Contents include four units consisting of twelve activities. Unit 1, Why You Need Food, is a self-examination of what is needed for growth, health,…

  12. Sustainability as Moral Action

    ERIC Educational Resources Information Center

    Dunn, Merrily S.; Hart-Steffes, Jeanne S.

    2012-01-01

    When one considers sustainability as a moral action, there are equally complex realities at hand--climate change, resource depletion, water and land rights. One author describes this broad sense of sustainability as "the connection of specific social and environmental problems to the functioning of human and ecological systems" (Jenkins, 2011).…

  13. Conjugate flow action functionals

    NASA Astrophysics Data System (ADS)

    Venturi, Daniele

    2013-11-01

    We present a new general framework to construct an action functional for a non-potential field theory. The key idea relies on representing the governing equations relative to a diffeomorphic flow of curvilinear coordinates which is assumed to be functionally dependent on the solution field. Such flow, which will be called the conjugate flow, evolves in space and time similarly to a physical fluid flow of classical mechanics and it can be selected in order to symmetrize the Gâteaux derivative of the field equations with respect to suitable local bilinear forms. This is equivalent to requiring that the governing equations of the field theory can be derived from a principle of stationary action on a Lie group manifold. By using a general operator framework, we obtain the determining equations of such manifold and the corresponding conjugate flow action functional. In particular, we study scalar and vector field theories governed by second-order nonlinear partial differential equations. The identification of transformation groups leaving the conjugate flow action functional invariant could lead to the discovery of new conservation laws in fluid dynamics and other disciplines.

  14. Economics Action Pack.

    ERIC Educational Resources Information Center

    McDonald's Corp., Oak Brook, IL.

    One of five McDonald's Action Packs, this learning package introduces intermediate grade students to basic economic concepts. The fourteen activities include the topics of consumption (4 activities), production (5), the market system (3), a pretest, and a posttest. Specific titles under consumption include The Wonderful Treasure Tree (introduction…

  15. From Awareness to Action

    ERIC Educational Resources Information Center

    Micklos, John, Jr.

    2012-01-01

    What inspires young people to become activists? Events such as wars or regime changes obviously raise high emotions. But some choose to get involved because they saw a need and felt compelled to take action. Young Americans have a long track record as activists. Among other things, they played a key role in the civil rights movement of the 1950s…

  16. Affirmative Action Fallout

    ERIC Educational Resources Information Center

    Roach, Ronald

    2005-01-01

    Race-conscious affirmative action in higher education survived a close challenge in 2003 when the U.S. Supreme Court ruled that race was a valid academic admission criteria in the "Grutter v. Bollinger" case. Two years later, a number of "pipeline" programs to help under-represented minorities gain admission to and complete graduate school have…

  17. Conjugate flow action functionals

    SciTech Connect

    Venturi, Daniele

    2013-11-15

    We present a new general framework to construct an action functional for a non-potential field theory. The key idea relies on representing the governing equations relative to a diffeomorphic flow of curvilinear coordinates which is assumed to be functionally dependent on the solution field. Such flow, which will be called the conjugate flow, evolves in space and time similarly to a physical fluid flow of classical mechanics and it can be selected in order to symmetrize the Gâteaux derivative of the field equations with respect to suitable local bilinear forms. This is equivalent to requiring that the governing equations of the field theory can be derived from a principle of stationary action on a Lie group manifold. By using a general operator framework, we obtain the determining equations of such manifold and the corresponding conjugate flow action functional. In particular, we study scalar and vector field theories governed by second-order nonlinear partial differential equations. The identification of transformation groups leaving the conjugate flow action functional invariant could lead to the discovery of new conservation laws in fluid dynamics and other disciplines.

  18. The Constitution in Action

    ERIC Educational Resources Information Center

    Potter, Lee Ann

    2007-01-01

    In this article, the author describes the experiences middle school students on a field trip to the new Constitution in Action Learning Lab in the Boeing Learning Center at the National Archives can expect. There, middle school students take on the roles of archivists and researchers collecting and analyzing primary sources from the holdings of…

  19. Jump into Action

    ERIC Educational Resources Information Center

    Ball, Stephen; Cohen, Ann; Meyer, Margaret

    2012-01-01

    Jump Into Action (JIA) is a school-based team-taught program to help fifth-grade students make healthy food choices and be more active. The JIA team (physical education teacher, classroom teacher, school nurse, and parent) work together to provide a supportive environment as students set goals to improve food choices and increase activity.…

  20. Hope for Environmental Action

    ERIC Educational Resources Information Center

    Fleischer, Barbara J.; DeMoor, Emily

    2015-01-01

    Environmental consciousness-raising programs tend to emphasize the magnitude of imminent ecological disasters, if humans continue on their current trajectory. While these environmental literacy programs also call for action to avoid cataclysmic ecological changes, psychological research on "learned helplessness" suggests that information…

  1. Action Learning Issues.

    ERIC Educational Resources Information Center

    1998

    This document contains four papers from a symposium on adult learning issues and human resource development (HRD). "Creating a Systemic Framework for the Transfer of Learning from an Action Learning Experience" (Suzanne D. Butterfield, Kitty Gold, Verna J. Willis) discusses a study of the organizational elements that affect learning and…

  2. Target: Development Action.

    ERIC Educational Resources Information Center

    American Freedom from Hunger Foundation, Washington, DC. Young World Development.

    This handbook, suggestive rather than prescriptive, is written for Young World Development and/or similar groups committed to active involvement in community, national, and world improvement. Emphasis is upon organizing high school, college, and adult courses and action programs in the community which will help sensitize participants and make them…

  3. Justifying Action Research

    ERIC Educational Resources Information Center

    Helskog, Guro Hansen

    2014-01-01

    In this paper I use a general philosophy of science perspective in looking at the problem of justifying action research. First I try to clarify the concept of justification, by contrasting it with the concept of validity, which seems to be used almost as a synonym in some parts of the literature. I discuss the need for taking a stand in relation…

  4. Classroom Assessment in Action

    ERIC Educational Resources Information Center

    Shermis, Mark D.; DiVesta, Francis J.

    2011-01-01

    "Classroom Assessment in Action" clarifies the multi-faceted roles of measurement and assessment and their applications in a classroom setting. Comprehensive in scope, Shermis and Di Vesta explain basic measurement concepts and show students how to interpret the results of standardized tests. From these basic concepts, the authors then…

  5. Quick action clamp

    NASA Technical Reports Server (NTRS)

    Calco, Frank S. (Inventor)

    1991-01-01

    A quick release toggle clamp that utilizes a spring that requires a deliberate positive action for disengagement is presented. The clamp has a sliding bolt that provides a latching mechanism. The bolt is moved by a handle that tends to remain in an engaged position while under tension.

  6. SYRACUSE ACTION FOR YOUTH.

    ERIC Educational Resources Information Center

    ADDINGTON, HAROLD E.; AND OTHERS

    A PROPOSAL WAS MADE TO PREVENT AND CONTROL JUVENILE DELINQUENCY BY OPENING OPPORTUNITIES AND DEVELOPING COMPETENCE AMONG DISADVANTAGED YOUTH. THE TOTAL COMMUNITY WAS MOBILIZED TO DEVELOP A PROGRAM TO ATTACK THE PROBLEM AT ALL LEVELS THEY WORKED FOR 18 MONTHS TO PLAN A SERIES OF CREATIVE ACTION PROGRAMS IN EDUCATION, EMPLOYMENT, AND COMMUNITY…

  7. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh.

    This affirmative action (AA) guide is intended to identify and remove discriminatory employment practices that may still exist in the North Carolina State Department of Public Instruction (DPI). DPI extends equal employment opportunity (EEO) to all applicants and employees without regard to race, color, religion, sex, age, handicap, political…

  8. The Shape of Action

    ERIC Educational Resources Information Center

    Hard, Bridgette Martin; Recchia, Gabriel; Tversky, Barbara

    2011-01-01

    How do people understand the everyday, yet intricate, behaviors that unfold around them? In the present research, we explored this by presenting viewers with self-paced slideshows of everyday activities and recording looking times, subjective segmentation (breakpoints) into action units, and slide-to-slide physical change. A detailed comparison of…

  9. Understanding disintegrant action by visualization.

    PubMed

    Desai, Parind Mahendrakumar; Liew, Celine Valeria; Heng, Paul Wan Sia

    2012-06-01

    The aim of this study was to utilize high-speed video imaging for understanding the disintegrability of compacts and disintegrant action upon wetting. High-speed video imaging was used to visualize the disintegration of compacts and effect of wetting on free disintegrant particles. Acquired images were processed using MATLAB, and changes in the compact area and instantaneous motion of compacted particles on contact with water were analyzed. The capillary action of compacts was also determined for various disintegrants. Finally, the breakdown behavior of compacts prepared with selected disintegrants was analyzed at different compression forces to evaluate recovery of compaction strain. Water-insoluble inert diluent, dicalcium phosphate, was used as a comparator. The results from this visualization study provided an in-depth understanding of the disintegrant behavior of free and compacted disintegrant particles upon wetting. The mechanisms of swelling, capillary action, disruption of particle-particle bonds and strain recovery were successfully monitored by video imaging. The disintegration of compacts containing crospovidone appeared to be less influenced by swelling or wicking action. The influence of compression force on the disintegration of selected disintegrants confirmed that strain recovery is the dominant mechanism for the disintegrant action of crospovidone.

  10. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect

    L. O. Nelson

    2003-09-01

    This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

  11. Superfund Record of Decision (EPA region 5): Fultz Landfill, Byesville, OH. (First remedial action), September 1991. Final report

    SciTech Connect

    Not Available

    1991-09-30

    The 30-acre Fultz Landfill site is a privately owned inactive sanitary landfill on the north slope of a ridge that overlies abandoned coal mines in Jackson Township, Guernsey County, Ohio. The site lies within the drainage basin of Wills Creek, which flows north adjacent to the site and is used by the city of Cambridge as the municipal water supply. The northern half of the landfill lies in an unreclaimed strip mine where surface mine spoil and natural soil form a shallow aquifer. During the 1970's, the landfill operator was cited for various violations. Investigations in 1988 by EPA indicated that ground water and leachate contaminants emanating from the site have contaminated the shallow aquifer and, to a lesser extent, the deep mine aquifer. The Record of Decision (ROD) addresses all contaminated media, and provides a final remedy for the site. The primary contaminants of concern affecting the soil, sediment, debris, ground water, and surface water are VOCs including benzene, PCE, TCE, toluene, and xylenes; other organics including PAHs and phenols; metals including arsenic, chromium, and lead; and other inorganics. The selected remedial action for this site is included.

  12. Superfund Record of Decision (EPA Region 6): Arkwood, Inc. , Omaha, AR. (First remedial action), September 1990. Final report

    SciTech Connect

    Not Available

    1990-09-28

    The 15-acre Arkwood site is a former wood treatment facility in Boone County, Arkansas. Land use in the vicinity of the site is primarily agricultural and light industrial. Ground water on, or near the site is highly susceptible to contamination as a result of underground cavities, enlarged fractures and conduits which hinder monitoring and pumping. State investigations conducted during the 1980s documented PCP and creosote contamination in surface water, soil, debris, and buildings throughout the site. Contaminated surface features at the site include the wood treatment facility, a sinkhole area contaminated with oily waste, a ditch area, a wood storage area, and an ash pile. In 1987, EPA ordered the site owner to perform an immediate removal action, which included implementing site access including fencing and sign postings. The Record of Decision (ROD) addresses remediation of all affected media, and provides the final remedy for the site. The primary contaminants of concern affecting the soil, sludge, debris, ground water and surface water are organics including pentachlorophenol (PCP), PAHs, and dioxin; and oils.

  13. A Metadata Action Language

    NASA Technical Reports Server (NTRS)

    Golden, Keith; Clancy, Dan (Technical Monitor)

    2001-01-01

    The data management problem comprises data processing and data tracking. Data processing is the creation of new data based on existing data sources. Data tracking consists of storing metadata descriptions of available data. This paper addresses the data management problem by casting it as an AI planning problem. Actions are data-processing commands, plans are dataflow programs and goals are metadata descriptions of desired data products. Data manipulation is simply plan generation and execution, and a key component of data tracking is inferring the effects of an observed plan. We introduce a new action language for data management domains, called ADILM. We discuss the connection between data processing and information integration and show how a language for the latter must be modified to support the former. The paper also discusses information gathering within a data-processing framework, and show how ADILM metadata expressions are a generalization of Local Completeness.

  14. Adipokines and insulin action

    PubMed Central

    Knights, Alexander J; Funnell, Alister PW; Pearson, Richard CM; Crossley, Merlin; Bell-Anderson, Kim S

    2014-01-01

    Obesity is a major public health concern and a strong risk factor for insulin resistance, type 2 diabetes mellitus (T2DM), and cardiovascular disease. The last two decades have seen a reconsideration of the role of white adipose tissue (WAT) in whole body metabolism and insulin action. Adipose tissue-derived cytokines and hormones, or adipokines, are likely mediators of metabolic function and dysfunction. While several adipokines have been associated with obese and insulin-resistant phenotypes, a select group has been linked with insulin sensitivity, namely leptin, adiponectin, and more recently, adipolin. What is known about these insulin-sensitizing molecules and their effects in healthy and insulin resistant states is the subject of this review. There remains a significant amount of research to do to fully elucidate the mechanisms of action of these adipokines for development of therapeutics in metabolic disease. PMID:24719781

  15. Atoms in Action

    SciTech Connect

    2009-01-01

    This movie produced with Berkeley Lab's TEAM 0.5 microscope shows the growth of a hole and the atomic edge reconstruction in a graphene sheet. An electron beam focused to a spot on the sheet blows out the exposed carbon atoms to make the hole. The carbon atoms then reposition themselves to find a stable configuration. http://newscenter.lbl.gov/press-releases/2009/03/26/atoms-in-action/

  16. Battle Space Action Centers

    DTIC Science & Technology

    2011-05-14

    VREEDE, G. J. D., & KOLFSCHOTEN, G. L . (2008). Extending the contextual and organizational elements of adaptive structurization theory in GSS...Reiter-Palmon, R., & Harland, L . (2009). Computer Assisted Collaboration Engineering and Process Support Systems: The BattleSpace ActionCenters...Collaboration Science, 27 February, University of Nebraska at Omaha, Omaha, NE. 18. BRIGGS, R.O., VREEDE, G.J. DE, REITER-PALMON, R., HARLAND, L

  17. Finding minimal action sequences with a simple evaluation of actions

    PubMed Central

    Shah, Ashvin; Gurney, Kevin N.

    2014-01-01

    Animals are able to discover the minimal number of actions that achieves an outcome (the minimal action sequence). In most accounts of this, actions are associated with a measure of behavior that is higher for actions that lead to the outcome with a shorter action sequence, and learning mechanisms find the actions associated with the highest measure. In this sense, previous accounts focus on more than the simple binary signal of “was the outcome achieved?”; they focus on “how well was the outcome achieved?” However, such mechanisms may not govern all types of behavioral development. In particular, in the process of action discovery (Redgrave and Gurney, 2006), actions are reinforced if they simply lead to a salient outcome because biological reinforcement signals occur too quickly to evaluate the consequences of an action beyond an indication of the outcome's occurrence. Thus, action discovery mechanisms focus on the simple evaluation of “was the outcome achieved?” and not “how well was the outcome achieved?” Notwithstanding this impoverishment of information, can the process of action discovery find the minimal action sequence? We address this question by implementing computational mechanisms, referred to in this paper as no-cost learning rules, in which each action that leads to the outcome is associated with the same measure of behavior. No-cost rules focus on “was the outcome achieved?” and are consistent with action discovery. No-cost rules discover the minimal action sequence in simulated tasks and execute it for a substantial amount of time. Extensive training, however, results in extraneous actions, suggesting that a separate process (which has been proposed in action discovery) must attenuate learning if no-cost rules participate in behavioral development. We describe how no-cost rules develop behavior, what happens when attenuation is disrupted, and relate the new mechanisms to wider computational and biological context. PMID:25506326

  18. Empirical microeconomics action functionals

    NASA Astrophysics Data System (ADS)

    Baaquie, Belal E.; Du, Xin; Tanputraman, Winson

    2015-06-01

    A statistical generalization of microeconomics has been made in Baaquie (2013), where the market price of every traded commodity, at each instant of time, is considered to be an independent random variable. The dynamics of commodity market prices is modeled by an action functional-and the focus of this paper is to empirically determine the action functionals for different commodities. The correlation functions of the model are defined using a Feynman path integral. The model is calibrated using the unequal time correlation of the market commodity prices as well as their cubic and quartic moments using a perturbation expansion. The consistency of the perturbation expansion is verified by a numerical evaluation of the path integral. Nine commodities drawn from the energy, metal and grain sectors are studied and their market behavior is described by the model to an accuracy of over 90% using only six parameters. The paper empirically establishes the existence of the action functional for commodity prices that was postulated to exist in Baaquie (2013).

  19. Archetypes as action patterns.

    PubMed

    Hogenson, George B

    2009-06-01

    The discovery of mirror neurons by researchers at the University of Parma promises to radically alter our understanding of fundamental cognitive and affective states. This paper explores the relationship of mirror neurons to Jung's theory of archetypes and proposes that archetypes may be viewed as elementary action patterns. The paper begins with a review of a proposed interpretation of the fainting spells of S. Freud in his relationship with Jung as an example of an action pattern that also defines an archetypal image. The challenge that mirror neurons present to traditional views in analytical psychology and psychoanalysis, however, is that they operate without recourse to a cognitive processing element. This is a position that is gaining increasing acceptance in other fields as well. The paper therefore reviews the most recent claims made by the Boston Process of Change Study Group as well as conclusions drawn from dynamic systems views of development and theoretical robotics to underline the conclusion that unconscious agency is not a requirement for coherent action. It concludes with the suggestion that this entire body of research may lead to the conclusion that the dynamic unconscious is an unnecessary hypothesis in psychoanalysis and analytical psychology.

  20. 76 FR 46355 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Actions on Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-02

    ... of California: The project will involve the removal of the existing bridge structure, construction of a new replacement of a new bridge structure, and improvements to bridge approaches and roadways in...). The actions relate to a proposed project to replace the Mt. Vernon Avenue Bridge (State Bridge No....

  1. 78 FR 77477 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Action on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... with a fixed bridge. As a structure over navigable waters of the United States, the proposed bridge... the Interstate 5 Bridge across the Columbia River AGENCY: Coast Guard, DHS. ACTION: Notice of... the issuance of a Coast Guard bridge permit, adoption of the bridge related portions of the...

  2. 75 FR 25309 - Notice of Final Federal Agency Actions on Proposed Expanded Intermodal Freight Terminal in Michigan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Freight Terminal in Michigan AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of... Yard, also known as the Detroit Intermodal Freight Terminal (DIFT) and associated external-to-terminal... following expansion project in the State of Michigan: Detroit Intermodal Freight Terminal. The...

  3. A Comprehensive Evaluation of OEO Community Action Programs on Six Selected American Indian Reservations. Report 4 - Final Report.

    ERIC Educational Resources Information Center

    Smith, James G. E.; And Others

    The impact of the Office of Economic Opportunity (OEO) Community Action Programs (CAP) on 6 selected American Indian reservations (Gila River and Papago, Arizona; Santa Clara Pueblo, New Mexico; Pine Ridge, South Dakota; Turtle Mountain, North Dakota, and White Earth Chippewa, Minnesota) are evaluated. After considering the development of Indian…

  4. 78 FR 64592 - Notice of Final Federal Agency Actions on the Stehekin Valley Road Improvement Project From the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... Improvement Project From the Stehekin River Corridor Implementation Plan: Chelan County, Washington AGENCY... Improvement project from the Stehekin River Corridor Implementation Plan in Chelan County, Washington. This action grants approval for the road improvement project element of the plan. DATES: By this notice,...

  5. 75 FR 10015 - Notice of Final Federal Agency Actions on the Interchange of State Loop 1604 and United States...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... 1604 and United States Highway 281 in Texas AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... State Loop 1604 (LP 1604) with United States Highway 281 (US 281). Project limits on LP 1604 are from Bitters Road to Redland Road and on US 281 are from LP 1604 to Bitters Road in Bexar County in the...

  6. 75 FR 80107 - Notice of Statute of Limitations on Claims; Notice of Final Federal Agency Actions on Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-21

    ... actions were taken, including but not limited to: 1. National Environmental Policy Act (NEPA) ; Federal-Aid Highway Act 2. Clean Air Act 3. Migratory Bird Treaty Act 4. Section 106 of the National Historic Preservation Act of 1966, as amended 5. Civil Rights Act of 1964 6. Comprehensive Environmental...

  7. 75 FR 62919 - Notice of Final Federal Agency Actions on the Route 250 Bypass Interchange at McIntire Road...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... at McIntire Road Project in Virginia AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... the Route 250 Bypass Interchange at McIntire Road project in the City of Charlottesville, Virginia... approvals for the following project in the State of Virginia: Route 250 Bypass Interchange at McIntire...

  8. Action spectra for photosynthetic inhibition

    NASA Technical Reports Server (NTRS)

    Caldwell, M. M.; Flint, S.; Camp, L. B.

    1981-01-01

    The ultraviolet action spectrum for photosynthesis inhibition was determined to fall between that of the general DNA action spectrum and the generalized plant action spectrum. The characteristics of this action spectrum suggest that a combination of pronounced increase in effectiveness with decreasing wavelength, substantial specificity for the UV-B waveband, and very diminished response in the UV-A waveband result in large radiation amplification factors when the action spectra are used as weighting functions. Attempted determination of dose/response relationships for leaf disc inhibition provided inconclusive data from which to deconvolute an action spectrum.

  9. Final Legislative and Budget Actions in Kentucky, Mississippi, Oklahoma, South Carolina and Texas: Notes from Other SREB States. Legislative Report No. 4

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2010

    2010-01-01

    The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. The reports include bill numbers and legislative Web site…

  10. 77 FR 50207 - Notice of Final Federal Agency Actions on Project: I-5: Glendale-Hugo Paving/Sexton Climbing Lane...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Project: I-5: Glendale- Hugo... relate to a proposed highway project, I-5: Glendale-Hugo Paving/Sexton Climbing Lane, in Douglas and...) 231- 2336. The I-5: Glendale-Hugo Paving/Sexton Climbing Lane categorical exclusion and other...

  11. On the Inclusion of Externally Controlled Actions in Action Planning

    ERIC Educational Resources Information Center

    Tsai, Jessica Chia-Chin; Knoblich, Gunther; Sebanz, Natalie

    2011-01-01

    According to ideomotor theories, perceiving action effects produced by others triggers corresponding action representations in the observer. We tested whether this principle extends to actions performed by externally controlled limbs and tools. Participants performed a go-no-go version of a spatial compatibility task in which their own actions…

  12. Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume II. Appendices

    SciTech Connect

    Not Available

    1983-07-01

    This report provides a summary of the conceptual design and other information necessary to understand the proposed remedial action at the expanded Canonsburg, Pennsylvania site. This design constitutes the current approach to stabilizing the radioactively contaminated materials in place in a manner that would fully protect the public health and environment. This summary is intended to provide sufficient detail for the reader to understand the proposed remedial action and the anticipated environmental impacts. The site conceptual design has been developed using available data. In some cases, elements of the design have not been developed fully and will be made final during the detailed design process.

  13. VIOLENT FRAMES IN ACTION

    SciTech Connect

    Sanfilippo, Antonio P.; McGrath, Liam R.; Whitney, Paul D.

    2011-11-17

    We present a computational approach to radical rhetoric that leverages the co-expression of rhetoric and action features in discourse to identify violent intent. The approach combines text mining and machine learning techniques with insights from Frame Analysis and theories that explain the emergence of violence in terms of moral disengagement, the violation of sacred values and social isolation in order to build computational models that identify messages from terrorist sources and estimate their proximity to an attack. We discuss a specific application of this approach to a body of documents from and about radical and terrorist groups in the Middle East and present the results achieved.

  14. Public affairs committee actions

    NASA Astrophysics Data System (ADS)

    The AGU Public Affairs Committee will create an ad hoc committee to consider possible AGU position statements concerning the effects of nuclear war.The action was taken at the May 31, 1983, meeting of the Committee at the AGU Spring Meeting in Baltimore. Present were Carroll Ann Hodges, Chairman, and members Thomas J. Ahrens, David Cauffman, Jared Cohon, Stamatios Krimigis, Robert Murphy, Raymond Roble, and George Shaw. Also attending were the current Congressional Fellow Arthur Weissman and SPR—Cosmic Rays Section Secretary Miriam Forman.

  15. Neurobiological actions of cysteamine

    SciTech Connect

    Brown, M.; Fisher, L.; Mason, R.T.; Rivier, J.; Vale, W.

    1985-06-01

    Somatostatin (SS)-related peptides act within discrete brain regions to inhibit adrenal epinephrine (E) secretion, to prevent hypothermia, and to produce hyperthermia. Depletion of brain concentrations of these SS-related peptides using cysteamine (CSH) or central administration of an SS receptor antagonist increases adrenal E secretion and impairs thermoregulation. These actions of CSH and the SS receptor antagonist are reversed by administration of SS into the central nervous system. These results support the hypothesis that endogenous brain SS-related peptides are involved in the regulation of adrenal E secretion and thermoregulation.

  16. 3RS action plan

    SciTech Connect

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  17. Developing an action concept inventory

    NASA Astrophysics Data System (ADS)

    McGinness, Lachlan P.; Savage, C. M.

    2016-06-01

    We report on progress towards the development of an Action Concept Inventory (ACI), a test that measures student understanding of action principles in introductory mechanics and optics. The ACI also covers key concepts of many-paths quantum mechanics, from which classical action physics arises. We used a multistage iterative development cycle for incorporating expert and student feedback into successive revisions of the ACI. The student feedback, including think-aloud interviews, enabled us to identify their misconceptions about action physics.

  18. Collaborative Action Research: Historical Trends.

    ERIC Educational Resources Information Center

    Smulyan, Lisa

    This paper presents a historical overview of the use of action research in education and describes the basic assumptions and expectations that continue to characterize collaborative research projects today. Action research was initiated in the 1930's by Kurt Lewin and adapted by educators in the 1940's. Interest in action research declined between…

  19. Action Research: Trends and Variations

    ERIC Educational Resources Information Center

    Beaulieu, Rodney J.

    2013-01-01

    Action research continues to grow as a research tradition, yet misconceptions about what it is and is not remains, even among scholars. For example, some mistakenly believe action research is only about professional development and is not a scholarly research approach. Some assume action research must be accomplished through a collaborative…

  20. Programming Tool-Use Actions

    ERIC Educational Resources Information Center

    Massen, Cristina; Prinz, Wolfgang

    2007-01-01

    When humans plan to execute a tool-use action, they can only specify the bodily movement parameters by taking into account the external target or goal of the tool-use action and the target-movement mapping implemented by the tool. In this study, the authors used the movement precuing method to investigate how people prepare for actions made with…

  1. Developing an Action Concept Inventory

    ERIC Educational Resources Information Center

    McGinness, Lachlan P.; Savage, C. M.

    2016-01-01

    We report on progress towards the development of an Action Concept Inventory (ACI), a test that measures student understanding of action principles in introductory mechanics and optics. The ACI also covers key concepts of many-paths quantum mechanics, from which classical action physics arises. We used a multistage iterative development cycle for…

  2. Rethinking Actions: Implementation and Association

    PubMed Central

    Chatterjee, Anjan

    2015-01-01

    Action processing allows us to move through and interact with the world, as well as understand the movements performed by other people. In recent years, there has been increasing interest in the semantics of actions as differentiated from the semantics of objects. However, as the understanding of action semantics has evolved, it is evident that the existing literature conflates two senses of the word “action”—one that stems from studies of tool use and the other from event representation. In this paper, we suggest that this issue can be clarified by closely examining differences in how the human parietal and temporal cortices of the brain process action-related stimuli. By contrasting the posterior parietal cortex to the posterolateral temporal cortex, we characterize two complementary action systems in the human brain, each with its own specialization of function. We suggest that these two systems be referred to as the parietal Action Implementation System, and the posterolateral temporal Action Association System. While the fronto-parietal system is concerned primarily with how we perform actions, and simulate others’ actions, the temporal action system is more involved with processing actions from a third-person, conceptual standpoint. Recent work in cognitive neuroscience of perception and language, as well as the neuroanatomical organization of these brain regions support this distinction. We will discuss the implications of this work for cognition-, language-, and neuroscience-based action research. PMID:26352170

  3. Action Principle for Relativistic Magnetohydrodynamics

    NASA Astrophysics Data System (ADS)

    D'Avignon, Eric; Morrison, Philip; Pegoraro, Francesco

    2015-11-01

    A covariant action principle for ideal relativistic magnetohydrodynamics in terms of natural Eulerian field variables is given. This is done by generalizing the covariant Poisson bracket theory of Marsden et al., which uses a noncanonical bracket to implement constrained variations of an action functional. Various implications and extensions of this action principle are also discussed.

  4. Motor Execution Affects Action Prediction

    ERIC Educational Resources Information Center

    Springer, Anne; Brandstadter, Simone; Liepelt, Roman; Birngruber, Teresa; Giese, Martin; Mechsner, Franz; Prinz, Wolfgang

    2011-01-01

    Previous studies provided evidence of the claim that the prediction of occluded action involves real-time simulation. We report two experiments that aimed to study how real-time simulation is affected by simultaneous action execution under conditions of full, partial or no overlap between observed and executed actions. This overlap was analysed by…

  5. Action Research in Music Education.

    ERIC Educational Resources Information Center

    Conway, Colleen M.; Borst, James

    2001-01-01

    Provides background information on using action research in music education. Offers guidelines for teachers to help them do action research. Includes an example of how a music teacher conducted action research in which the teacher asked, "Why did [the students] continue vocal music from middle school to high school?" (CMK)

  6. Solving Wicked Problems through Action Learning

    ERIC Educational Resources Information Center

    Crul, Liselore

    2014-01-01

    This account of practice outlines the Oxyme Action Learning Program which was conducted as part of the Management Challenge in my final year of the MSc in Coaching and Behavioral Change at Henley Business School. The central research questions were: (1) how action learning can help to solve wicked problems and (2) what the effect of an action…

  7. Wave action power plant

    SciTech Connect

    Lucia, L.V.

    1982-03-16

    A wave action power plant powered by the action of water waves has a drive shaft rotated by a plurality of drive units, each having a lever pivotally mounted on and extending from said shaft and carrying a weight, in the form of a float, which floats on the waves and rocks the lever up and down on the shaft. A ratchet mechanism causes said shaft to be rotated in one direction by the weight of said float after it has been raised by wave and the wave has passed, leaving said float free to move downwardly by gravity and apply its full weight to pull down on the lever and rotate the drive shaft. There being a large number of said drive units so that there are always some of the weights pulling down on their respective levers while other weights are being lifted by waves and thereby causing continuous rotation of the drive shaft in one direction. The said levers are so mounted that they may be easily raised to bring the weights into a position wherein they are readily accessible for cleaning the bottoms thereof to remove any accumulation of barnacles, mollusks and the like. There is also provided means for preventing the weights from colliding with each other as they independently move up and down on the waves.

  8. Capillary action liquid chromatography.

    PubMed

    Zhang, Bo; Bergström, Edmund T; Goodall, David M; Myers, Peter

    2009-06-01

    Capillary action LC (caLC) is introduced as a technique using capillary action as the driving force to perform LC in capillary columns packed with HPLC type microparticulate materials. A dry packing method with centrifugal force was developed to prepare capillary columns in parallel (10 columns per 3 min) to support their disposable use in caLC. Using a digital microscope for real-time imaging and recording separations of components in a dye mixture, caLC was found to have flow characteristics similar to TLC. Based on the investigation of microparticulate HPLC silica gels of different size (1.5-10 microm) and a typical TLC grade irregular medium, Merck 60G silica, the van Deemter curves suggested molecular diffusion as the major contribution to band broadening in caLC. With Waters Xbridge 2.6 microm silica, plate heights down to 8.8 microm were obtained, comparable to those achievable in HPLC. Assisted by an image-processing method, the visual caLC separation was converted to a classical chromatogram for further data analysis and such a facility confirmed the observation of highly efficient bands.

  9. Remedial Action Plan and final design for stabilization of the inactive uranium mill tailings at Green River, Utah. Volume 1, Text, Appendices A, B, and C: Final report

    SciTech Connect

    Matthews, M.L.; Alkema, K.

    1991-03-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities that are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Green River, Utah. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the state of Utah and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state of Utah, and concurrence by the NRC, becomes Appendix 8 of the Cooperative Agreement.

  10. Controlling Attention through Action: Observing Actions Primes Action-Related Stimulus Dimensions

    ERIC Educational Resources Information Center

    Fagioli, Sabrina; Ferlazzo, Fabio; Hommel, Bernhard

    2007-01-01

    Previous findings suggest that planning an action "backward-primes" perceptual dimension related to this action: planning a grasp facilitates the processing of visual size information, while planning a reach facilitates the processing of location information. Here we show that dimensional priming of perception through action occurs even in the…

  11. The minimalist grammar of action

    PubMed Central

    Pastra, Katerina; Aloimonos, Yiannis

    2012-01-01

    Language and action have been found to share a common neural basis and in particular a common ‘syntax’, an analogous hierarchical and compositional organization. While language structure analysis has led to the formulation of different grammatical formalisms and associated discriminative or generative computational models, the structure of action is still elusive and so are the related computational models. However, structuring action has important implications on action learning and generalization, in both human cognition research and computation. In this study, we present a biologically inspired generative grammar of action, which employs the structure-building operations and principles of Chomsky's Minimalist Programme as a reference model. In this grammar, action terminals combine hierarchically into temporal sequences of actions of increasing complexity; the actions are bound with the involved tools and affected objects and are governed by certain goals. We show, how the tool role and the affected-object role of an entity within an action drives the derivation of the action syntax in this grammar and controls recursion, merge and move, the latter being mechanisms that manifest themselves not only in human language, but in human action too. PMID:22106430

  12. Antiviral Actions of Interferons

    PubMed Central

    Samuel, Charles E.

    2001-01-01

    Tremendous progress has been made in understanding the molecular basis of the antiviral actions of interferons (IFNs), as well as strategies evolved by viruses to antagonize the actions of IFNs. Furthermore, advances made while elucidating the IFN system have contributed significantly to our understanding in multiple areas of virology and molecular cell biology, ranging from pathways of signal transduction to the biochemical mechanisms of transcriptional and translational control to the molecular basis of viral pathogenesis. IFNs are approved therapeutics and have moved from the basic research laboratory to the clinic. Among the IFN-induced proteins important in the antiviral actions of IFNs are the RNA-dependent protein kinase (PKR), the 2′,5′-oligoadenylate synthetase (OAS) and RNase L, and the Mx protein GTPases. Double-stranded RNA plays a central role in modulating protein phosphorylation and RNA degradation catalyzed by the IFN-inducible PKR kinase and the 2′-5′-oligoadenylate-dependent RNase L, respectively, and also in RNA editing by the IFN-inducible RNA-specific adenosine deaminase (ADAR1). IFN also induces a form of inducible nitric oxide synthase (iNOS2) and the major histocompatibility complex class I and II proteins, all of which play important roles in immune response to infections. Several additional genes whose expression profiles are altered in response to IFN treatment and virus infection have been identified by microarray analyses. The availability of cDNA and genomic clones for many of the components of the IFN system, including IFN-α, IFN-β, and IFN-γ, their receptors, Jak and Stat and IRF signal transduction components, and proteins such as PKR, 2′,5′-OAS, Mx, and ADAR, whose expression is regulated by IFNs, has permitted the generation of mutant proteins, cells that overexpress different forms of the proteins, and animals in which their expression has been disrupted by targeted gene disruption. The use of these IFN system

  13. Words and actions.

    PubMed

    Kissling, F

    1999-01-01

    This is an editorial that appeared in the journal Conscience. Church leaders have long employed a rhetoric that stigmatizes those who perform abortions and women who have abortions. According to many men in the Church, women who have abortions are either mindless victims or are devoid of moral sensibility. In addition to treating abortion as if it were murder, church leaders also brand it as evil. With this kind of language coming from the church, British Columbia Catholic editor Paul Schratz's assertion that something positive might come from killing a doctor who has provided an abortion can hardly be seen as aberrant. Presently, the reaction of those engaged in the abortion wars is to reject any notion that their language contributes in any way to murders, injuries, and bombings. But language leads to action and violent rhetoric can engender violent deeds.

  14. The Quench Action

    NASA Astrophysics Data System (ADS)

    Caux, Jean-Sébastien

    2016-06-01

    We give a pedagogical introduction to the methodology of the Quench Action, which is an effective representation for the calculation of time-dependent expectation values of physical operators following a generic out-of-equilibrium state preparation protocol (for example a quantum quench). The representation, originally introduced in Caux and Essler (2013 Phys. Rev. Lett. 110 257203), is founded on a mixture of exact data for overlaps together with variational reasonings. It is argued to be quite generally valid and thermodynamically exact for arbitrary times after the quench (from short times all the way up to the steady state), and applicable to a wide class of physically relevant observables. Here, we introduce the method and its language, give an overview of some recent results, suggest a roadmap and offer some perspectives on possible future research directions.

  15. Taking action against violence.

    PubMed

    Kunz, K

    1996-05-01

    Significant increase in violent crimes in recent years forced Icelandic men to take action against violence. Television was seen as a major contributory factor in increasing violence. Surveys indicate that 10-15 years after television broadcasting commences in a particular society, the incidence of crime can be expected to double. While the majority of the individuals arrested for violent crimes are men, being male does not necessarily mean being violent. The Men's Committee of the Icelandic Equal Rights Council initiated a week-long information and education campaign under the theme "Men Against Violence". This campaign involved several events including an art exhibit, speeches on violence in families, treatment sought by those who are likely to resort to violence, booklet distribution among students in secondary schools, and a mass media campaign to raise public awareness on this pressing problem.

  16. Guam Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  17. Structure learning in action

    PubMed Central

    Braun, Daniel A.; Mehring, Carsten; Wolpert, Daniel M.

    2010-01-01

    ‘Learning to learn’ phenomena have been widely investigated in cognition, perception and more recently also in action. During concept learning tasks, for example, it has been suggested that characteristic features are abstracted from a set of examples with the consequence that learning of similar tasks is facilitated—a process termed ‘learning to learn’. From a computational point of view such an extraction of invariants can be regarded as learning of an underlying structure. Here we review the evidence for structure learning as a ‘learning to learn’ mechanism, especially in sensorimotor control where the motor system has to adapt to variable environments. We review studies demonstrating that common features of variable environments are extracted during sensorimotor learning and exploited for efficient adaptation in novel tasks. We conclude that structure learning plays a fundamental role in skill learning and may underlie the unsurpassed flexibility and adaptability of the motor system. PMID:19720086

  18. An agenda for action.

    PubMed

    1987-01-01

    Participants at the 1985 Maseru Seminar on Another Development for Southern African Development Coordination Conference (SADCC) Countries developed an agenda for action aimed at ending the exploitation of people in the region. Another Development, a concept first introduced into the worldwide debate about economic development in 1975, is based on 5 premises: development should be need-oriented, self-reliant, endogenous, ecologically sound, and based on structural transformations. It should be viewed as an integrated socioeconomic, political, and cultural process. Participants noted that conventional development policies are becoming increasingly incapable of satisfying the basic needs of people in the SADCC region for food, health, housing, education, and employment. The Agenda for Action recognizes that the problems of dependency cannot be solved by the more intensive application of development strategies that created the problems in the first place. Needed, instead, is: 1) effective popular participation in all decision-making processes; 2) the transformation of social structures to facilitate effective participation in decision-making; 3) the full exercise of human rights; 4) the establishment of local, district, and national papers and publishing houses dedicated to the right to be informed; 5) the gearing of agricultural production primarily to the growing of food for domestic markets, with exports limited to surpluses; 6) the production of raw materials for manufactured goods that meet local needs; 7) land reform; 8) the coordinated development of both light and heavy industry and mining, with an emphasis on decentralization of industries to rural areas; 9) the allocation of higher priority to resources for housing; 10) the integration of meaningful productive work into the educational system at every level; 11) the development of an endogenous science and technology base; and 12) the allocation of the resources needed for a primary health care system.

  19. Learning from their own actions: the unique effect of producing actions on infants' action understanding.

    PubMed

    Gerson, Sarah A; Woodward, Amanda L

    2014-01-01

    Prior research suggests that infants' action production affects their action understanding, but little is known about the aspects of motor experience that render these effects. In Study 1, the relative contributions of self-produced (n = 30) and observational (n = 30) action experience on 3-month-old infants' action understanding was assessed using a visual habituation paradigm. In Study 2, generalization of training to a new context was examined (n = 30). Results revealed a unique effect of active over observational experience. Furthermore, findings suggest that benefits of trained actions do not generalize broadly, at least following brief training.

  20. Everyday robotic action: lessons from human action control

    PubMed Central

    de Kleijn, Roy; Kachergis, George; Hommel, Bernhard

    2014-01-01

    Robots are increasingly capable of performing everyday human activities such as cooking, cleaning, and doing the laundry. This requires the real-time planning and execution of complex, temporally extended sequential actions under high degrees of uncertainty, which provides many challenges to traditional approaches to robot action control. We argue that important lessons in this respect can be learned from research on human action control. We provide a brief overview of available psychological insights into this issue and focus on four principles that we think could be particularly beneficial for robot control: the integration of symbolic and subsymbolic planning of action sequences, the integration of feedforward and feedback control, the clustering of complex actions into subcomponents, and the contextualization of action-control structures through goal representations. PMID:24672474

  1. Everyday robotic action: lessons from human action control.

    PubMed

    de Kleijn, Roy; Kachergis, George; Hommel, Bernhard

    2014-01-01

    Robots are increasingly capable of performing everyday human activities such as cooking, cleaning, and doing the laundry. This requires the real-time planning and execution of complex, temporally extended sequential actions under high degrees of uncertainty, which provides many challenges to traditional approaches to robot action control. We argue that important lessons in this respect can be learned from research on human action control. We provide a brief overview of available psychological insights into this issue and focus on four principles that we think could be particularly beneficial for robot control: the integration of symbolic and subsymbolic planning of action sequences, the integration of feedforward and feedback control, the clustering of complex actions into subcomponents, and the contextualization of action-control structures through goal representations.

  2. Riverland expedited response action proposal

    SciTech Connect

    Not Available

    1993-04-01

    The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

  3. Superfund Record of Decision (EPA Region 3): Voortman Farm Site, Lehigh County, Pennsylvania (first remedial action) June 1988. Final report

    SciTech Connect

    Not Available

    1988-06-30

    The 43-acre Voortman Farm site is located in Upper Salucon Township, Lehigh County, Pennsylvania. The site consists of a sinkhole that contained empty battery casings disposed of in late 1979 and early 1980. Citizen complaints in 1980 prompted the prohibition of dumping and subsequent site investigation. In September 1986, the battery casings in the sinkhole caught on fire. Since the battery casings were burning underground, attempts to extinguish the fire remained unsuccessful. There does not appear to be any leaching from any residual metals, contaminated soils or battery casings present. The selected remedial action for the site is included.

  4. Proposed plan/Statement of basis for the Grace Road Site (631-22G) operable unit: Final action

    SciTech Connect

    Palmer, E.

    1997-08-19

    This Statement of Basis/Proposed Plan is being issued by the U. S. Department of Energy (DOE), which functions as the lead agency for the Savannah River Site (SRS) remedial activities, with concurrence by the U. S. Environmental Protection Agency (EPA), and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this Statement of Basis/Proposed Plan is to describe the preferred alternative for addressing the Grace Road site (GRS) located at the Savannah River Site (SRS), in Aiken, South Carolina and to provide an opportunity for public input into the remedial action selection process.

  5. Final decision document for the interim response action at the lime settling basins, Rocky Mountain Arsenal, version 4.0

    SciTech Connect

    1990-03-01

    The objective of the interim response action at the lime settling basins is to mitigate the threat of releases from the basins. The proposed IRA consists of: (1) relocation of sludge material to the settling basin; (2) construction of a 360 degree subsurface barrier around the basins; (3) construction of a soil and vegetative cover over the material; and (4) installation of a ground water extraction system. This decision document provides summaries of: (1) alternative technologies considered, (2) significant events leading to the initiation of the IRA, (3) the IRA Project, and (4) applicable or relevant and appropriate requirements, standards, criteria, and limitations (ARAR`s) associated with the program.

  6. Action-based flood forecasting for triggering humanitarian action

    NASA Astrophysics Data System (ADS)

    Coughlan de Perez, Erin; van den Hurk, Bart; van Aalst, Maarten K.; Amuron, Irene; Bamanya, Deus; Hauser, Tristan; Jongma, Brenden; Lopez, Ana; Mason, Simon; Mendler de Suarez, Janot; Pappenberger, Florian; Rueth, Alexandra; Stephens, Elisabeth; Suarez, Pablo; Wagemaker, Jurjen; Zsoter, Ervin

    2016-09-01

    Too often, credible scientific early warning information of increased disaster risk does not result in humanitarian action. With financial resources tilted heavily towards response after a disaster, disaster managers have limited incentive and ability to process complex scientific data, including uncertainties. These incentives are beginning to change, with the advent of several new forecast-based financing systems that provide funding based on a forecast of an extreme event. Given the changing landscape, here we demonstrate a method to select and use appropriate forecasts for specific humanitarian disaster prevention actions, even in a data-scarce location. This action-based forecasting methodology takes into account the parameters of each action, such as action lifetime, when verifying a forecast. Forecasts are linked with action based on an understanding of (1) the magnitude of previous flooding events and (2) the willingness to act "in vain" for specific actions. This is applied in the context of the Uganda Red Cross Society forecast-based financing pilot project, with forecasts from the Global Flood Awareness System (GloFAS). Using this method, we define the "danger level" of flooding, and we select the probabilistic forecast triggers that are appropriate for specific actions. Results from this methodology can be applied globally across hazards and fed into a financing system that ensures that automatic, pre-funded early action will be triggered by forecasts.

  7. Superfund Record of Decision (EPA Region 7): John's Sludge Pond, Wichita, KS. (First remedial action), September 1989. Final report

    SciTech Connect

    Not Available

    1989-09-22

    The Johns' Sludge Pond site is in a relatively undeveloped area in the city of Wichita, Sedgwick County, Kansas. During the 1950s and 1960s the Super Refined Oil Company used the sludge pond for the disposal of waste oil and up to 15,000 cubic yards of oily sludge generated by the oil recycling and reclamation operation. Because sulfuric acid was used to refine waste oil for recycling, the wastes dumped into the pond were very acidic. Additionally, high lead concentrations and low PCB concentrations (less than 50 ppm) were also detected in the sludge. As surface water flowed into the pond, an extremely acidic layer of water formed on top of the sludge which often overflowed into nearby surface waters. The city subsequently built berms to prevent further surface runoff. In 1983 EPA ordered the city to undertake interim cleanup activities which consisted of excavating and solidifying the sludge using cement kiln dust with redeposition of the treated sludge into a compacted clay-lined cell followed by capping using a compacted clay cap. Surface and ground water monitoring following the interim action have not detected any contaminant levels that would require further action.

  8. Superfund Record of Decision (EPA Region 7): John's Sludge Pond, Wichita, KS. (First remedial action), September 1989. Final report

    SciTech Connect

    Not Available

    1989-09-22

    The Johns' Sludge Pond site is in a relatively undeveloped area in the city of Wichita, Sedgwick County, Kansas. During the 1950s and 1960s the Super Refined Oil Company used the sludge pond for the disposal of waste oil and up to 15,000 cubic yards of oily sludge generated by the oil recycling and reclamation operation. Because sulfuric acid was used to refine waste oil for recycling, the wastes dumped into the pond were very acidic. Additionally, high lead concentrations and low PCB concentrations (less than 50 ppm) were also detected in the sludge. As surface water flowed into the pond, an extremely acidic layer of water formed on top of the sludge which often overflowed into nearby surface waters. The city subsequently built berms to prevent further surface runoff. In 1983 EPA ordered the city to undertake interim cleanup activities which consisted of excavating and solidifying the sludge using cement kilm dust with redeposition of the treated sludge into a compacted clay-lined cell followed by capping using a compacted clay cap. Surface and ground water monitoring following the interim action have not detected any contaminant levels that could require further action.

  9. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    SciTech Connect

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  10. Final Characterization Report for Corrective Action Unit 109: Area 2 U-2BU Crater, Nevada Test Site, Nevada, Revision 1

    SciTech Connect

    ITLV

    1998-12-01

    Corrective Action Unit 109, Area 2 U-2bu Crater, is an inactive Resource Conservation and Recovery Act Part A Permit disposal unit located in Area 2 at the Nevada Test Site, Nevada. The Corrective Action Unit has been characterized under the requirements of the Nevada Test Site Resource Conservation and Recovery Act, Part A Permit (NDEP, 1995) and Title 40 Code of Federal Regulations Part 265 (CFR, 1996). The site characterization was performed under the RCRA Part A Permit Characterization Plan for the U-2bu Subsidence Crater (DOE/NV, 1998c), as approved by the Nevada Division of Environmental Protection (Liebendorfer, 1998). The primary objective of the site characterization activities was to evaluate the presence, concentration, and extent of any Resource Conservation and Recovery Act contaminants in the crater. Surface soil samples were collected on April 22, 1998, and subsurface soil samples and geotechnical samples were collected from April 27-29, 1998. Soil samples were collected using a hand auger or a piston-type drive hammer to advance a 5-centimeter (2-inch) diameter steel sampling tool into the ground. The permit for the Nevada Test Site requires that Corrective Action Unit 109 be closed under 40 Code of Federal Regulations 265 Subpart G and 40 Code of Federal Regulations Part 265.310 (CFR, 1996). Analysis of the data collected during the characterization effort indicates that lead was detected in Study Area 1 at 5.7 milligrams per liter, above the regulatory level in 40 Code of Federal Regulations 261.24 of 5.0 milligrams per liter. Except for the lead detection at a single location within the crater, the original Resource Conservation Recovery Act constituents of potential concern determined between the U.S. Department of Energy, Nevada Operations Office and the Nevada Department of Environmental Protection during the Data Quality Objectives process (DOE/NV, 1998b) were not found to be present at Corrective Action Unit 109 above regulatory levels of

  11. Combined Action Platoons in Vietnam

    DTIC Science & Technology

    2012-04-27

    relied on the CAPs to secure their rear areas. Lieutenant Colonel William Corson , who later commanded the Combined Action Program, wrote in his 1968...countered Viet Cong propaganda with their persistent actions. Lieutenant Colonel Corson wrote “the CAPs have been able to confound one of the most important...Combined Action Platoons; The US Marines’ Other War (New York: Praeger Publishers 1989), 22 14 Ibid. 15 Ibid. 16 William R. Corson , The

  12. Plan of action. Information.

    PubMed

    Leduc, J W

    1996-11-01

    This article provides information on WHO¿s strategic plan of action to aid countries around the world in detecting and controlling emerging infectious diseases. Activities are conducted through an organizational structure that ensures cost-sharing among all the 190 member states of WHO. Four major goals incorporating specific tasks are suggested: 1) the strengthening of global surveillance of infectious diseases through WHO collaborating centers; 2) the rebuilding of the international infrastructure to recognize, report, and respond to emerging and resurgent infectious diseases through laboratory and communication improvement 3) the fostering of applied research through greater practical use of the biotechnological revolution, and 4) the enhancement of the international capacity for infectious disease prevention and control through defined and practical public health steps. To implement this program, a workshop has been conducted and the WHONET program for laboratories has been introduced. In addition, clear guidance will be needed on the question of when to make changes in the antimicrobials recommended for specific diseases. The WHO strategy aims to enhance the capacity of local and national public health laboratories, to foster applied research to address practical problems, and to improve infectious disease prevention and control.

  13. Numbers in Action

    PubMed Central

    Rugani, Rosa; Sartori, Luisa

    2016-01-01

    Humans show a remarkable tendency to describe and think of numbers as being placed on a mental number line (MNL), with smaller numbers located on the left and larger ones on the right. Faster responses to small numbers are indeed performed on the left side of space, while responses to large numbers are facilitated on the right side of space (spatial-numerical association of response codes, SNARC effect). This phenomenon is considered the experimental demonstration of the MNL and has been extensively replicated throughout a variety of paradigms. Nevertheless, the majority of previous literature has mainly investigated this effect by means of response times and accuracy, whereas studies considering more subtle and automatic measures such as kinematic parameters are rare (e.g., in a reaching-to-grasp movement, the grip aperture is enlarged in responding to larger numbers than in responding to small numbers). In this brief review we suggest that numerical magnitude can also affect the what and how of action execution (i.e., temporal and spatial components of movement). This evidence could have large implications in the strongly debated issue concerning the effect of experience and culture on the orientation of MNL. PMID:27524965

  14. Numbers in Action.

    PubMed

    Rugani, Rosa; Sartori, Luisa

    2016-01-01

    Humans show a remarkable tendency to describe and think of numbers as being placed on a mental number line (MNL), with smaller numbers located on the left and larger ones on the right. Faster responses to small numbers are indeed performed on the left side of space, while responses to large numbers are facilitated on the right side of space (spatial-numerical association of response codes, SNARC effect). This phenomenon is considered the experimental demonstration of the MNL and has been extensively replicated throughout a variety of paradigms. Nevertheless, the majority of previous literature has mainly investigated this effect by means of response times and accuracy, whereas studies considering more subtle and automatic measures such as kinematic parameters are rare (e.g., in a reaching-to-grasp movement, the grip aperture is enlarged in responding to larger numbers than in responding to small numbers). In this brief review we suggest that numerical magnitude can also affect the what and how of action execution (i.e., temporal and spatial components of movement). This evidence could have large implications in the strongly debated issue concerning the effect of experience and culture on the orientation of MNL.

  15. Nonclassical vitamin D action.

    PubMed

    Zittermann, Armin; Gummert, Jan F

    2010-04-01

    It is becoming increasingly clear that vitamin D has a broad range of actions in the human body. Besides its well-known effects on calcium/phosphate homeostasis, vitamin D influences muscle function, cardiovascular homeostasis, nervous function, and the immune response. Vitamin D deficiency/insufficiency has been associated with muscle weakness and a high incidence of various chronic diseases such as cardiovascular disease, cancer, multiple sclerosis, and type 1 and 2 diabetes. Most importantly, low vitamin D status has been found to be an independent predictor of all-cause mortality. Several recent randomized controlled trials support the assumption that vitamin D can improve muscle strength, glucose homeostasis, and cardiovascular risk markers. In addition, vitamin D may reduce cancer incidence and elevated blood pressure. Since the prevalence of vitamin D deficiency/insufficiency is high throughout the world, there is a need to improve vitamin D status in the general adult population. However, the currently recommended daily vitamin D intake of 5-15 µg is too low to achieve an adequate vitamin D status in individuals with only modest skin synthesis. Thus, there is a need to recommend a vitamin D intake that is effective for achieving adequate circulating 25-hydroxyvitamin D concentrations (>75 nmol/L).

  16. Less chalk more action

    NASA Astrophysics Data System (ADS)

    Mitriceski Andelkovic, Bojana; Jovic, Sladjana

    2016-04-01

    Less chalk more action Education should not be a mechanical system that operates according to the principles of the orders and implementation. Education should respect the basic laws of the develop and progress. Curiosity is the engine of achievement and children spontaneously and happily learn only if they get interested, if teacher wake up and stimulate their creativity and individuality. We would like to present classes that are realized as thematic teaching with several subjects involved: chemistry, geography, math, art and biology. Classes were organized for students at age from 10 to 13 years, every month during autumn and winter 2015. Better students identified themselves as teachers and presented peer education .Teachers were monitoring the process of teaching and help to develop links between younger and older students, where older students were educators to younger students. Also one student with special needs was involved in this activities and was supported by other students during the workshops The benefit from this project will be represented with evaluation marks. Evaluation table shows that group of ten students(age 10 to13 years) which are selected in October as children with lack of motivation for learning, got better marks, at the end of January , then they had it in the beginning of the semester.

  17. [Antimicrobial mechanisms of action].

    PubMed

    Calvo, Jorge; Martínez-Martínez, Luis

    2009-01-01

    A large number of families and groups of antimicrobial agents are of clinical interest. The mechanisms by which compounds with antibacterial activity inhibit growth or cause bacterial death are varied and depend on the affected targets. The bacterial cell wall-a unique structure in most bacteria that is absent in eukaryotic cells-can be affected in several ways: at different stages of synthesis (fosfomycin, cycloserine) or transport (bacitracin, mureidomycins) of its metabolic precursors, or by a direct action on its structural organization (beta-lactams, glycopeptides). The main drugs affecting the cytoplasmic membrane are polymyxins and daptomycin. Protein synthesis can be blocked by a large variety of compounds that affect any of the phases of this process, including activation (mupirocin), initiation (oxazolidinones, aminoglycosides), binding of the tRNA amino acid complex to ribosomes (tetracyclines, glycylcyclines) and elongation (amphenicols, lincosamides, macrolides, ketolides, streptogramins, fusidic acid). The metabolism of nucleic acids can be altered at the DNA-dependent RNA polymerase or in the process of DNA coiling (quinolones); some compounds affect DNA directly (nitroimidazoles, nitrofurans). Trimethoprim and sulfamides (often used in combination) are examples of antimicrobial agents that block bacterial metabolic pathways. Some compounds are unable to inhibit or kill bacteria in themselves, but can block bacterial mechanisms of resistance, enhancing the activity of other antimicrobials administered in combination. Among this group of agents, only certain beta-lactamase inhibitors are currently in clinical use.

  18. Semigroup Actions of Expanding Maps

    NASA Astrophysics Data System (ADS)

    Carvalho, Maria; Rodrigues, Fagner B.; Varandas, Paulo

    2017-01-01

    We consider semigroups of Ruelle-expanding maps, parameterized by random walks on the free semigroup, with the aim of examining their complexity and exploring the relation between intrinsic properties of the semigroup action and the thermodynamic formalism of the associated skew-product. In particular, we clarify the connection between the topological entropy of the semigroup action and the growth rate of the periodic points, establish the main properties of the dynamical zeta function of the semigroup action and relate these notions to recent research on annealed and quenched thermodynamic formalism. Meanwhile, we examine how the choice of the random walk in the semigroup unsettles the ergodic properties of the action.

  19. Early Developments in Joint Action

    PubMed Central

    Brownell, Celia A.

    2012-01-01

    Joint action, critical to human social interaction and communication, has garnered increasing scholarly attention in many areas of inquiry, yet its development remains little explored. This paper reviews research on the growth of joint action over the first 2 years of life to show how children become progressively more able to engage deliberately, autonomously, and flexibly in joint action with adults and peers. It is suggested that a key mechanism underlying the dramatic changes in joint action over the second year of life is the ability to reflect consciously on oneself and one’s behavior and volition and correspondingly, on the behavior, goals, and intentions of others. PMID:23087769

  20. Expert anticipation from deceptive action.

    PubMed

    Mori, Shuji; Shimada, Takuro

    2013-05-01

    Expertise in sports enhances the ability to anticipate forthcoming events from the observation of a player's actions. In the present study, we investigated whether this ability is applicable to deceptive action. In three experiments, performance at anticipating the direction change of a running opponent was examined with experienced rugby players and novice counterparts. These experiments were conducted with reaction-time and temporal-occlusion tasks, in combination with eye movement recordings and the presentation of filmed actions and their point-light representations. The main finding was that the experienced players were superior to the novices in their anticipation of deceptive actions, although their performance was still impaired by the deception, in comparison with their anticipation of nondeceptive actions. We also found that the experienced players anticipated nondeceptive actions less accurately than the novices, suggesting that the players' expectations of deceptive actions worked negatively on their judgments of nondeceptive actions. The results obtained with the point-light representations closely resembled those obtained with the filmed sequences, indicating that anticipation was based on the kinematics of the running action. These results are discussed in the context of recent developments in research on expertise and deception in sports.

  1. From Movements to Actions: Two Mechanisms for Learning Action Sequences

    ERIC Educational Resources Information Center

    Endress, Ansgar D.; Wood, Justin N.

    2011-01-01

    When other individuals move, we interpret their movements as discrete, hierarchically-organized, goal-directed actions. However, the mechanisms that integrate visible movement features into actions are poorly understood. Here, we consider two sequence learning mechanisms--transitional probability-based (TP) and position-based encoding…

  2. Images in Action: Preservice Teachers' Action Researcher Images

    ERIC Educational Resources Information Center

    Subramaniam, Karthigeyan

    2010-01-01

    The purpose of this paper is to address the gap that exists in the knowledge base for understanding the repertoire of images that preservice teachers gain as they engage in action research. Data were collected using a variety of qualitative methods: journals, metaphors, narratives, action research reports, and focus group interviews. Data were…

  3. Action simulation plays a critical role in deceptive action recognition.

    PubMed

    Tidoni, Emmanuele; Borgomaneri, Sara; di Pellegrino, Giuseppe; Avenanti, Alessio

    2013-01-09

    The ability to infer deceptive intents from nonverbal behavior is critical for social interactions. By combining single-pulse and repetitive transcranial magnetic stimulation (TMS) in healthy humans, we provide both correlational and causative evidence that action simulation is actively involved in the ability to recognize deceptive body movements. We recorded motor-evoked potentials during a faked-action discrimination (FAD) task: participants watched videos of actors lifting a cube and judged whether the actors were trying to deceive them concerning the real weight of the cube. Seeing faked actions facilitated the observers' motor system more than truthful actions in a body-part-specific manner, suggesting that motor resonance was sensitive to deceptive movements. Furthermore, we found that TMS virtual lesion to the anterior node of the action observation network, namely the left inferior frontal cortex (IFC), reduced perceptual sensitivity in the FAD task. In contrast, no change in FAD task performance was found after virtual lesions to the left temporoparietal junction (control site). Moreover, virtual lesion to the IFC failed to affect performance in a difficulty-matched spatial-control task that did not require processing of spatiotemporal (acceleration) and configurational (limb displacement) features of seen actions, which are critical to detecting deceptive intent in the actions of others. These findings indicate that the human IFC is critical for recognizing deceptive body movements and suggest that FAD relies on the simulation of subtle changes in action kinematics within the motor system.

  4. The Holst Action by the Spectral Action Principle

    NASA Astrophysics Data System (ADS)

    Pfäffle, Frank; Stephan, Christoph A.

    2011-10-01

    We investigate the Holst action for closed Riemannian 4-manifolds with orthogonal connections. For connections whose torsion has zero Cartan type component we show that the Holst action can be recovered from the heat asymptotics for the natural Dirac operator acting on left-handed spinor fields.

  5. The Development of Action Planning in a Joint Action Context

    ERIC Educational Resources Information Center

    Paulus, Markus

    2016-01-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus.…

  6. Emancipatory Education and Action Research. Action Research Series No. 1.

    ERIC Educational Resources Information Center

    Davidoff, Sue, Ed.; And Others

    This book is the result of a seminar on emancipatory education and the action research projects in the Department of Didactics at the University of the Western Cape in South Africa. The book starts with questions regarding the nature of action research. This first chapter discusses the meaning of some crucial organizing concepts, asks questions…

  7. Superfund Record of Decision (EPA Region 2): Sinclair Refinery, Allegany County, Wellsville, NY. (Second remedial action), September 1991. Final report

    SciTech Connect

    Not Available

    1991-09-30

    The Sinclair Refinery site is a former refinery in Wellsville, Allegany County, New York. The site is composed of a 90-acre refinery area, 10-acre landfill area, and 14-acre offsite tank farm. From 1901 to 1958, the site was used to process Pennsylvania grade crude oil until a fire in 1958 halted operations. Currently, some private companies and the State University of New York occupy the site. A 1981 site inspection revealed that debris from the eroding landfill area has washed into and contaminated the Genesee River. The ROD addresses OU2, remediation of the remaining contaminated areas at the site located within the 90-acre refinery area and the offsite tank farm including the contaminated ground water beneath the refinery. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene and xylenes, semi-volatile compounds including naphthalene and nitrobenzene, and metals including arsenic and lead. The selected remedial action for the site is included.

  8. Superfund Record of Decision (EPA Region 2): South Brunswick, New Jersey (second remedial action), September 1987. Final report

    SciTech Connect

    Not Available

    1987-09-30

    The Browning-Ferris Industries South Brunswick Landfill (BFI) is a closed landfill in Middlesex County, New Jersey. The site is in close proximity to a brook that feeds into a public drinking water supply 10 miles downstream. For more than twenty years the site operated, under two separate owners, as a solid-waste landfill that received municipal refuse, pesticides, chemical wastes and hazardous wastes. The site was officially closed in December 1978. A site investigation revealed elevated levels of VOCs and iron in the ground water and surface water. The selected remedial action for the site includes onsite containment (leachate collection/treatment system, slurry wall, clay cap, gas venting system), which was initiated in May 1983 and completed on September 1985; and post-remedial ground water, surface and air monitoring.

  9. Superfund Record of Decision (EPA Region 2): Tabernacle Drum Dump, New Jersey (first remedial action), June 1988. Final report

    SciTech Connect

    Not Available

    1988-06-30

    The Tabernacle Drum Dump site is a one-acre facility located in Tabernacle Township, Burlington County, New Jersey. Drum-disposal activities, which resulted in contamination by hazardous substances, occurred on a 2,000 sq ft area portion of the site. During 1976 and 1977, the Atlantic Disposal Services (ADS), disposed of approximately 200 fifty-five gallon drums, twenty gallon containers, and five gallon paint cans, which were stored at the site from 1977 to 1984. Deterioration and leakage of some containers resulted in visible soil contamination and ultimately ground-water contamination. The principal threat posed at the site is potential ingestion of ground water including VOCs. Remedial actions for this site are discussed.

  10. Multi-Scale Action Effectiveness Research in the Lower Columbia River and Estuary, 2011 - FINAL ANNUAL REPORT

    SciTech Connect

    Sather, Nichole K.; Storch, Adam; Johnson, Gary E.; Teel, D. J.; Skalski, J. R.; Bryson, Amanda J.; Kaufmann, Ronald M.; Woodruff, Dana L.; Blaine, Jennifer; Kuligowski, D. R.; Kropp, Roy K.; Dawley, Earl M.

    2012-05-31

    The study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL), the Oregon Department of Fish and Wildlife (ODFW), the University of Washington (UW), and the National Marine Fisheries Service (NMFS) for the U.S. Army Corps of Engineers, Portland District (USACE). This research project was initiated in 2007 by the Bonneville Power Administration to investigate critical uncertainties regarding juvenile salmon ecology in shallow tidal freshwater habitats of the lower Columbia River. However, as part of the Washington Memorandum of Agreement, the project was transferred to the USACE in 2010. In transferring from BPA to the USACE, the focus of the tidal freshwater research project shifted from fundamental ecology toward the effectiveness of restoration in the Lower Columbia River and estuary (LCRE). The research is conducted within the Action Agencies Columbia Estuary Ecosystem Restoration Program (CEERP). Data reported herein spans the time period May 2010 to September 2011.

  11. Superfund Record of Decision (EPA Region 9): Kopper's (Oroville Plant), CA. (First remedial action), September 1989. Final report

    SciTech Connect

    Not Available

    1989-09-13

    The Koppers (Oroville Plant) site is a 200-acre operating wood treating plant in Butte County, California, just south of Oroville. Although there is a history of wood-treating operations at the site, wood-treating operations were greatly expanded in 1955 when Koppers Company, Inc. became the owner and operator. Chemical preservatives including pentachlophenol (PCP), creosote, and chlorinated copper arsenate solution have been used in the wood treating processes. Waste-water discharge and other site activities have resulted in contamination of unlined ponds, soil, and debris. Pursuant to a State order, Koppers conducted cleanup activities from 1973-74, including ground-water pumping and discharge to spray fields and offsite disposal of contaminated debris, and process changes, including construction of a waste-water treatment plant. In 1986 Koppers provided an alternate water supply for domestic uses to affected residents. The selected remedial action for this site includes a soil component and a ground-water component.

  12. Superfund Record of Decision (EPA region 5): Tri-State Plating, Columbus, IN. (First remedial action), March 1990. Final report

    SciTech Connect

    Not Available

    1990-03-30

    The 3,900-square foot Tri-State Plating site is an abandoned metal plating facility in Columbus, Bartholomew County, Indiana. Land use in the vicinity of the site is residential and industrial. Metal plating operations at the site began during the 1940s. In 1983, the State identified soil contaminated with chromium, lead, and other metals, which was thought to be a result of an onsite waste spill. In 1984, following additional onsite waste disposal violations, onsite spills, and the failure of Tri-State plating to install an onsite waste treatment system, the State blocked sewers from the site and cut off the water supply. From 1987 to 1989, in two separate actions, EPA removed 27 drums of inorganic material from the storage building, excavated contaminated onsite soil, decontaminated and demolished all onsite structures. This ROD addresses the contaminated onsite ground water. The primary contaminants of concern affecting the ground water are metals including chromium.

  13. Superfund Record of Decision (EPA Region 1): Revere textile prints, Sterling, CT. (First remedial action), September 1992. Final report

    SciTech Connect

    Not Available

    1992-09-30

    The 15-acre Revere Textile Prints site is an industrial facility, located in Sterling, Windham County, Connecticut. From 1879 to 1980, several textile processing facilities used the site to print colored and patterned fabrics, which involved using pigments, dyes, and solvents. Throughout the site's history, process rinse water and leftover printing pigments were disposed of into floor drains that drained into Moosup River. In 1980, the state ordered the PRP to dispose of the 1,500 drums offsite along with an unspecified amount of stained soils; the action was completed in 1983. Between 1982 and 1983, W. F. Norman Company purchased the site for metal stamping operations, and subsequently abandoned the site. The ROD addresses site soil, sediment, ground water, and surface water. The results of the RI have shown no evidence of significant site contamination, and where contaminants were detected, the levels were usually significantly below the federal MCLs.

  14. Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume I

    SciTech Connect

    Not Available

    1983-07-01

    The environmental impacts associated with remedial actions in connection with residual radioactive materials remaining at the inactive uranium processing site located in Canonsburg, Washington County, Pennsylvania are evaluated. The Canonsburg site is an 18.5-acre property that was formerly owned by the Vitro Rare Metals Company. The expanded Canonsburg site would be 30-acre property that would include the Canonsburg site (the former Vitro Rare Metals plant), seven adjacent private houses, and the former Georges Pottery property. During the period 1942 through 1957 the Vitro Manufacturing Company and its successor, the Vitro Corporation of America, processed onsite residues and ores, and government-owned ores, concentrates, and scraps to extract uranium and other rare metals. The Canonsburg site is now the Canon Industrial Park. In addition to storing the residual radioactive materials of this process at the Canonsburg site, about 12,000 tons of radioactively contaminated materials were transferred to a railroad landfill in Burrell Township, Indiana County, Pennsylvania. This Canonsburg FEIS evaluates five alternatives for removing the potential public health hazard associated with the radioactively contaminated materials. In addition to no action, these alternatives involve various combinations of stabilization of the radioactively contaminated materials in place or decontamination of the Canonsburg and Burrell sites by removing the radioactively contaminated materials to another location. In addition to the two sites mentioned, a third site located in Hanover Township, Washington County, Pennsylvania has been considered as a disposal site to which the radioactively contaminated materials presently located at either of the other two sites might be moved.

  15. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    SciTech Connect

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings, and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.

  16. Bodily action penetrates affective perception

    PubMed Central

    Rigutti, Sara; Gerbino, Walter

    2016-01-01

    Fantoni & Gerbino (2014) showed that subtle postural shifts associated with reaching can have a strong hedonic impact and affect how actors experience facial expressions of emotion. Using a novel Motor Action Mood Induction Procedure (MAMIP), they found consistent congruency effects in participants who performed a facial emotion identification task after a sequence of visually-guided reaches: a face perceived as neutral in a baseline condition appeared slightly happy after comfortable actions and slightly angry after uncomfortable actions. However, skeptics about the penetrability of perception (Zeimbekis & Raftopoulos, 2015) would consider such evidence insufficient to demonstrate that observer’s internal states induced by action comfort/discomfort affect perception in a top-down fashion. The action-modulated mood might have produced a back-end memory effect capable of affecting post-perceptual and decision processing, but not front-end perception. Here, we present evidence that performing a facial emotion detection (not identification) task after MAMIP exhibits systematic mood-congruent sensitivity changes, rather than response bias changes attributable to cognitive set shifts; i.e., we show that observer’s internal states induced by bodily action can modulate affective perception. The detection threshold for happiness was lower after fifty comfortable than uncomfortable reaches; while the detection threshold for anger was lower after fifty uncomfortable than comfortable reaches. Action valence induced an overall sensitivity improvement in detecting subtle variations of congruent facial expressions (happiness after positive comfortable actions, anger after negative uncomfortable actions), in the absence of significant response bias shifts. Notably, both comfortable and uncomfortable reaches impact sensitivity in an approximately symmetric way relative to a baseline inaction condition. All of these constitute compelling evidence of a genuine top-down effect on

  17. Convulsant actions of calycanthine.

    PubMed

    Chebib, Mary; Duke, Rujee K; Duke, Colin C; Connor, Mark; Mewett, Kenneth N; Johnston, Graham A R

    2003-07-01

    The principal alkaloid of the family Calycanthaceae, calycanthine has long been recognized as a central convulsant. The alkaloid inhibited the potassium-stimulated release of [(3)H]GABA from slices of rat hippocampus with an ED(50) of approximately 21 microM. This effect appeared to be moderately selective since calycanthine at 100 microM had only a weak effect on the potassium-stimulated release of [(3)H]acetylcholine (15%) and no significant effects on the release of [(3)H]D-aspartate from hippocampal and cerebellar slices or the release of [(3)H]glycine from spinal cord slices. Calycanthine blocked the L-type calcium currents with an IC(50) of approximately 42 microM and also weakly inhibited the N-type calcium currents (IC(50) > 100 microM) from neuroblastoma X glioma cells, suggesting voltage-dependent calcium channel blockade as a possible mechanism for its inhibition of GABA and ACh release. Calycanthine was also found to directly inhibit GABA-mediated currents (K(B) approximately 135 microM) from human alpha(1)beta(2)gamma(2L) GABA(A) receptors expressed in Xenopus laevis oocytes but had no effect at 100 microM on human rho(1) GABA(c) receptors. The results indicated that calycanthine may mediate its convulsant action predominantly by inhibiting the release of the inhibitory neurotransmitter GABA as a result of interactions with L-type Ca(2+) channels and by inhibiting GABA-mediated chloride currents at GABA(A) receptors.

  18. Disorders of androgen action.

    PubMed

    Sultan, Charles; Lumbroso, Serge; Paris, Françoise; Jeandel, Claire; Terouanne, B; Belon, Charles; Audran, F; Poujol, N; Georget, V; Gobinet, J; Jalaguier, S; Auzou, G; Nicolas, J C

    2002-08-01

    Disorders of androgen action are the main cause of male pseudohermaphroditism and include 5alphaR deficiency and androgen receptor defects. 5alphaR deficiency is characterized by female genitalia with some degree of masculinization, clitoromegaly, and severely bifid scrotum corresponding to the so-called pseudovaginal perineoscrotal hypospadias. At the onset of puberty, increased muscle mass, development of pubic hair, and phallic growth are associated with the acquisition of male gender identity. Normal or increased levels of testosterone and an elevated testosterone-to-dihydrotestosterone ratio after human chorionic gonadotropin stimulation testing suggest 5alphareductase deficiency, and the diagnosis can be ascertained by identifying the mutation in the 5alphaR-2 gene. Whatever the patient's age at diagnosis, psychological evaluation with 5alphaRD is vital. Androgen receptor defects encompass two clinical expressions: the complete and partial androgen insensitivity syndromes. Complete androgen insensitivity syndrome should be suspected at birth in the presence of inguinal hernia in a girl without genital ambiguity. At puberty, the sign of alert is primary amenorrhea with normal female phenotype and harmonious mammary development but no pubic hair growth. Partial androgen insensitivity syndrome covers a wide spectrum of undervirilized phenotypes ranging from clitoromegaly at birth to infertile men. In all cases, complementary investigations should include plasma testosterone and luteinizing hormone as well as androgen-binding capacity in cultured genital skin fibroblasts. Diagnosis is confirmed by identification of the androgen receptor gene mutation. Although patients with complete androgen insensitivity syndrome are raised as females, patients with partial androgen insensitivity syndrome should be managed according to age at diagnosis, response to treatment with exogenous androgens, and the presence of an androgen gene mutation. Gonadectomy in complete androgen

  19. Putting strategy into action.

    PubMed

    1992-04-01

    The outcome of the Women's Workshop in Oaxaca, Mexico in February 1992 is presented. 76 participants discussed strategies for promoting women's health and development in Latin America and the Caribbean and reviewed progress on last year's Plan of Action. In Colombia many points in the Plan were adopted by government policy and the Council for Women, Youth and Family. The information, education and communication (IEC) materials were helpful to a Brazilian participant in producing IEC materials and another workshop would help her support training for community leaders. The flip charts on Women's Rights to Health with topics on maternal and child health, reproductive health, and family planning (FP) were highly evaluated. Other successful materials were a video promoting breast feeding and women's rights which was produced by the Guatemala FP Association (APROFAM) and an AIDS prevention video for women made by the Center for Mothers, Children, Infants and FP of Brazil. Not only did participants evaluate materials but they also had to participate in discussions and present their ideas for a film promoting women's health at the sub-regional level. A field trip was conducted to Integrated Project (IP) villages in Oaxaca, and participants observed field workers using "Now, a New Wind Blows," a photo made by the UNFPA and JOICFP, to mobilize women. This booklet reputedly helped to mobilize a group of 70 women in the village of San Lucas Cuilapan. A comparison was made to the 1st workshop which provided an overview of the status of women in the region and the 4th which manifested concrete results and active participation of all involved.

  20. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  1. Habits as action sequences: hierarchical action control and changes in outcome value

    PubMed Central

    Dezfouli, Amir; Lingawi, Nura W.; Balleine, Bernard W.

    2014-01-01

    Goal-directed action involves making high-level choices that are implemented using previously acquired action sequences to attain desired goals. Such a hierarchical schema is necessary for goal-directed actions to be scalable to real-life situations, but results in decision-making that is less flexible than when action sequences are unfolded and the decision-maker deliberates step-by-step over the outcome of each individual action. In particular, from this perspective, the offline revaluation of any outcomes that fall within action sequence boundaries will be invisible to the high-level planner resulting in decisions that are insensitive to such changes. Here, within the context of a two-stage decision-making task, we demonstrate that this property can explain the emergence of habits. Next, we show how this hierarchical account explains the insensitivity of over-trained actions to changes in outcome value. Finally, we provide new data that show that, under extended extinction conditions, habitual behaviour can revert to goal-directed control, presumably as a consequence of decomposing action sequences into single actions. This hierarchical view suggests that the development of action sequences and the insensitivity of actions to changes in outcome value are essentially two sides of the same coin, explaining why these two aspects of automatic behaviour involve a shared neural structure. PMID:25267824

  2. Mode of Action of Glyphosate

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Although glyphosate is the most used and studied herbicide in the world, the available information is not enough to fully understand its mode of action. The molecular site of action of glyphosate is the enzyme 5-enolpyruvlyshikimate-3-phosphate synthase (EPSPS). It is the only known compound that ...

  3. Thought and Action in Education

    ERIC Educational Resources Information Center

    Rømer, Thomas Aastrup

    2015-01-01

    In much theory there is a tendency to place thought above action, or the opposite, action over thought. The consequence of the first option is that philosophy or scientific evidence gains the upper hand in educational thinking. The consequence of the second view is that pragmatism and relativism become the dominant features. This article discusses…

  4. Action Research Empowers School Librarians

    ERIC Educational Resources Information Center

    Robins, Jennifer

    2015-01-01

    Successful school library programs occur through careful planning and reflection. This reflective process is improved when it is applied in a systematic way through action research. The action research described in this paper enabled school librarians to reflect based on evidence, using data they had collected. This study presents examples of the…

  5. Action Research: Theory and Applications

    ERIC Educational Resources Information Center

    Jefferson, Renée N.

    2014-01-01

    Action research as a methodology is suitable for use within academic library settings. Its theoretical foundations are located in several disciplines and its applications span across many professions. In this article, an overview of the theoretical beginnings and evolution of action research is presented. Approaches generally used in conducting an…

  6. Action Understanding as Inverse Planning

    ERIC Educational Resources Information Center

    Baker, Chris L.; Saxe, Rebecca; Tenenbaum, Joshua B.

    2009-01-01

    Humans are adept at inferring the mental states underlying other agents' actions, such as goals, beliefs, desires, emotions and other thoughts. We propose a computational framework based on Bayesian inverse planning for modeling human action understanding. The framework represents an intuitive theory of intentional agents' behavior based on the…

  7. Philosophy, Methodology and Action Research

    ERIC Educational Resources Information Center

    Carr, Wilfred

    2006-01-01

    The aim of this paper is to examine the role of methodology in action research. It begins by showing how, as a form of inquiry concerned with the development of practice, action research is nothing other than a modern 20th century manifestation of the pre-modern tradition of practical philosophy. It then draws in Gadamer's powerful vindication of…

  8. Automatic Imitation of Intransitive Actions

    ERIC Educational Resources Information Center

    Press, Clare; Bird, Geoffrey; Walsh, Eamonn; Heyes, Cecilia

    2008-01-01

    Previous research has indicated a potential discontinuity between monkey and human ventral premotor-parietal mirror systems, namely that monkey mirror systems process only transitive (object-directed) actions, whereas human mirror systems may also process intransitive (non-object-directed) actions. The present study investigated this discontinuity…

  9. Affirmative Action: Is it Fair?

    ERIC Educational Resources Information Center

    Dworkin, Ronald

    2000-01-01

    Addresses the fairness of affirmative action, suggesting it will be unfortunate if the Supreme Court reverses its ruling, because dramatic evidence of its value in elite higher education has just become available. After discussing legal rulings, the paper concludes that affirmative action makes the eventual economic and social structure of…

  10. Integrating CHAT and Action Research

    ERIC Educational Resources Information Center

    Wells, Gordon

    2011-01-01

    The question as to how action research (AR) is related to cultural-historical activity theory (CHAT) is not answerable in categorical terms. Both CHAT and AR have been variously interpreted and much depends on the individual biographies of those who pronounce on their relationship. The aim of this paper is to show how action research, conducted…

  11. Taking Action with Teacher Research.

    ERIC Educational Resources Information Center

    Meyers, Ellen; Rust, Frances O'Connell

    This collection of papers presents examples of teacher research in action. Each study grew out of teachers' questions regarding the implementation of some aspect of education policy in their schools and classrooms. After "Introduction" (Frances O'Connell Rust and Ellen Meyers), the eight papers focus on: (1) "How We Do Action Research" (Frances…

  12. American Samoa: Energy Action Plan

    SciTech Connect

    Ness, J. Erik; Haase, Scott; Conrad, Misty

    2016-09-01

    This document outlines actions being taken to reduce American Samoa's petroleum consumption. It describes the four near-term strategies selected by the American Samoa Renewable Energy Committee during action-planning workshops conducted in May 2016, and describes the steps that will need to be taken to implement those strategies.

  13. Action Learning in the BBC

    ERIC Educational Resources Information Center

    Felix, Eversley; Keevill, Joan

    2008-01-01

    This account tells the story of the development of an action learning culture in the BBC between 2002 and 2007. From its early beginnings as a sporadic, unsystematic intervention with a small number of leaders scattered throughout the organisation, action learning has now become embedded in our approach to the way we develop our leaders. In this…

  14. Community Action for Environmental Quality.

    ERIC Educational Resources Information Center

    Citizens Advisory Committee on Environmental Quality.

    For citizens who want to participate in practical action to make their communities better places for living, this guide considers numerous approaches for community involvement. It stresses not only comprehensive planning but also the importance of getting action started. A rough order of business is suggested. First, considered are the various…

  15. Technology assessment and citizen action

    NASA Technical Reports Server (NTRS)

    Mottur, E. R.

    1975-01-01

    Citizen participation in the nation's total social, political, economic decisionmaking processes was studied. Impediments are discussed which prevent citizens from taking effective assessment action; these include finance, organization and motivation, and information. The proposal for establishing citizens assessment associations is considered along with implications of citizen assessment action.

  16. Action perception as hypothesis testing.

    PubMed

    Donnarumma, Francesco; Costantini, Marcello; Ambrosini, Ettore; Friston, Karl; Pezzulo, Giovanni

    2017-04-01

    We present a novel computational model that describes action perception as an active inferential process that combines motor prediction (the reuse of our own motor system to predict perceived movements) and hypothesis testing (the use of eye movements to disambiguate amongst hypotheses). The system uses a generative model of how (arm and hand) actions are performed to generate hypothesis-specific visual predictions, and directs saccades to the most informative places of the visual scene to test these predictions - and underlying hypotheses. We test the model using eye movement data from a human action observation study. In both the human study and our model, saccades are proactive whenever context affords accurate action prediction; but uncertainty induces a more reactive gaze strategy, via tracking the observed movements. Our model offers a novel perspective on action observation that highlights its active nature based on prediction dynamics and hypothesis testing.

  17. A More improved lattice action for heavy quarks

    SciTech Connect

    M. B. Oktay et al.

    2004-03-17

    We extend the Fermilab formalism for heavy quarks to develop a more improved action. We give results of matching calculations of the improvement couplings at tree level. Finally, we estimate the discretization errors associated with the new action.

  18. Decision Making in Action

    NASA Technical Reports Server (NTRS)

    Orasanu, Judith; Statler, Irving C. (Technical Monitor)

    1994-01-01

    contributes to performance because it assures that all crew members have essential information, but it also regulates and coordinates crew actions and is the medium of collective thinking in response to a problem. This presentation will examine the relations between leadership, communication, decision making and overall crew performance. Implications of these findings for spaceflight and training for offshore installations will be discussed.

  19. [Biological actions of acetaldehyde].

    PubMed

    Ijiri, I

    1999-11-01

    Acetaldehyde (AcH), the first metabolite of ethanol (EtOH), is a chemically reactive and pharmacologically active compound. The author has been engaged in the study of AcH in cooperation with many researchers for three decades. We have found many biological actions of AcH which cause cardiovascular symptoms after drinking and also inhibited EtOH absorption via the canine and rat intestinal tract. This report covers the following five points. 1. The subjects were classified into a non-flushing group and a flushing group, according to the degree of facial flushing after drinking 200 ml of Sake (Japanese rice wire) at a rate of 100 ml per 5 min. Blood EtOH profile was much the same in both groups, yet peak blood AcH concentration in the flushing group was significantly higher than that in the non-flushing group. All subjects in the flushing group showed marked flushing and an increase in pulse rate after drinking, but these symptoms were not apparent in the non-flushing group. These results suggested that cardiovascular symptoms were caused by AcH itself. 2. Urinary excretions of both norepinephrine and epinephrine increased in the flushing cases after drinking Sake in comparison with those who drank the same volume of water. However, these catecholamines did not change in the non-flushing group. These results suggested that it is catecholamines released from the sympathetic nerve end or the adrenal medulla by AcH which caused an increase in pulse rate. 3. Bradykinin is released from high molecular kininogen by activated kallikrein and acts to dilate distal blood vessels and raise permeability in tissues. On the other hand, kallidin is released from low molecular kininogen by activated glandular kallikrein and its action is weaker than that of bradykinin. Blood low molecular kininogen levels in the flushing group decreased gradually after drinking and were mutually related to the blood AcH concentrations. But levels in the non-flushing group showed no difference

  20. Superfund Record of Decision (EPA Region 9): Coalinga Asbestos Mine, Fresno County, CA. (Second remedial action), September 1990. Final report

    SciTech Connect

    Not Available

    1990-09-21

    The 557-acre Coalinga Asbestos Mine site, a former asbestos processing area and chromite mine, comprises part of the Johns Manville Coalinga Asbestos Mill site in western Fresno County, California. This rural mountainous area is used primarily for recreational purposes. From 1962 to 1974, asbestos ore from several local mines was processed and sorted onsite, and the resulting asbestos mill tailings were periodically bulldozed into an intermittent stream channel. Subsequently, from 1975 to 1977, a chromite milling operation was conducted onsite. Tailings were often washed downstream during periods of stream flow, and the resuspension of asbestos fibers from the tailings into the air produced a significant inhalation hazard. As a result of these activities, approximately 450,000 cubic yards of mill tailings and asbestos ore remain onsite within a large tailing pile. In 1980 and 1987, State investigations indicated that the site was contributing a significant amount of asbestos into the surface water. The site will be remediated as two Operable Units (OU). The Record of Decision (ROD) addresses the remedial action for OU2, the Johns Manville Coalinga Asbestos Mill Area. The primary contaminant of concern affecting the surface water is asbestos.

  1. Superfund Record of Decision (EPA Region 5): Midco II, IN. (First remedial action), June 1989. Final report

    SciTech Connect

    Not Available

    1989-06-30

    The MIDCO II site is a seven-acre storage and disposal facility in Gary, Indiana. The surrounding area is predominantly used for industrial purposes, and includes 34 other potential hazardous-waste sites. The underlying aquifer is highly susceptible to contamination from surface sources because of the high water table; however, in the vicinity of the site, the aquifer is used primarily for non-drinking-water purposes. The same operator as at another Superfund site, MIDCO I, began waste operations, including drum storage at MIDCO II during the summer of 1976. Following a major fire at the MIDCO I site in January 1977, MIDCO transferred the operations from the MIDCO I site to the MIDCO II site. Operations included temporarily storing bulk liquid and drum wastes; neutralizing acids and caustics; and disposing of wastes by dumping wastes into onsite pits, which allowed wastes to percolate into the ground water. The resulting PCB-contaminated soil pile was removed and disposed of in an offsite hazardous waste landfill in early 1986, and most of the cyanide-contaminated pile was also removed. Removal activities ended in January 1986. The primary contaminants of concern currently affecting the soil, sediment, and ground water are VOCs including benzene, toluene, TCE, and xylenes; other organics including PCBs; and metals including arsenic, chromium, and lead. The selected remedial action for the site is included.

  2. Superfund Record of Decision (EPA Region 5): Wedzeb enterprises, Lebanan, IN. (First Remedial Action), June 1989. Final report

    SciTech Connect

    Not Available

    1989-06-30

    The 0.75-acre Wedzeb Enterprises site is located in Lebanon, Indiana. Originally, two warehouses, one of which was used as a storage facility for electrical capacitors and transformers containing polychlorinated biphenyls (PCBs), were located on site. In May 1981 the warehouse used for storage was completely destroyed by fire. Contaminants may have been washed into the sewer lines during the fire, providing a source of long-term contaminant release to the Lebanon publicly-owned treatment works (POTW). The primary contaminants of concern affecting the sewer sediment are PCBs. The selected remedial action for the site includes cleaning the sewer lines with hydraulic jets and vacuum pumping to remove contaminants, followed by filtering the resulting water and sediment to remove PCB-contaminated sediment, and discharging the water to the POTW; offsite incineration and disposal of the estimated 2 drums of sediment and 20 drums of remedial-investigation-generated waste if PCB levels are 50 mg/kg or greater, or offsite disposal only if PCB levels are below 50 mg/kg; and a television inspection of the pipeline to ensure structural integrity.

  3. US Department of Energy final response to standards for remedial actions at inactive uranium processing sites; Proposed rule

    SciTech Connect

    Not Available

    1988-11-14

    This document revisits and supplements information and recommendations presented in the January 1988 US Department of Energy (DOE) submission to the US Environmental Protection Agency (EPA) regarding the proposed standards for Title I uranium processing sites (DOE, 1988). The clarifications and comments in this report are based on further DOE investigation, contemplation, and interpretation of the proposed standards. Since the January response, the DOE has undertaken a number of special studies to -investigate, evaluate, focus, and clarify issues relating to the standards. In addition, the Nuclear Regulatory Commission (NRC) has issued a draft technical position outlining its interpretation of the proposed standards and clarifying how the standards will be implemented (NRC, 1988). Some issues presented are based on previous positions, and the original DOE position is restated for reference. Other issues or recommendations are more recent than the January DOE response; therefore, no former position was advanced. The order of presentation reflects the general order of significance to the DOE, specifically in regards to the Uranium Mill Tailings Remedial Action (UMTRA) Project.

  4. Superfund Record of Decision (EPA Region 5): Big D Campground, Kingsville, OH. (First Remedial Action), September 1989. Final report

    SciTech Connect

    Not Available

    1989-09-29

    The Big D Campground site is in Kingsville, Ashtabula County, Ohio. The site consists of a 1.2-acre landfill created out of a former sand and gravel quarry. From 1964 to 1976 the site owner accepted approximately 28,000 cubic yards of hazardous materials for disposal which included up to 5,000 drums containing solvents, caustics, and oily substances. A 1986 remedial investigation identified the landfill as the primary source of contamination in soil outside the landfill and ground water underlying the landfill. Ground water contamination is of significant concern because it is migrating towards the drinking water supply wells of nearby residences and Conneaut Creek which is adjacent to and south of the site. The primary contaminants of concern affecting the soil and ground water are VOCs including PCE and TCE, other organics, and metals including chromium and lead. The selected remedial action for this site includes removing and incinerating up to 5,000 buried drums, bulk wastes, and up to 30,000 cubic yards of contaminated soil followed by onsite disposal of nonhazardous ash residue; pumping and treatment of 40,000,000 to 60,000,000 gallons of ground water.

  5. Superfund Record of Decision (EPA Region 6): South Cavalcade Street Site, Houston, Texas (first remedial action) September 1988. Final report

    SciTech Connect

    Not Available

    1988-09-26

    The 66-acre South Cavalcade site is located in northeast Houston, Texas. The surrounding areas are a mixture of residential, commercial, and industrial properties. Stormwater runoff flows to two stormwater drainage ditches, which flow into Hunting Bayou, a limited aquatic habitat as classified by Texas Water Quality Standards. The site was used as a wood-preserving and coal-tar distillation facility from 1910 to 1962. The wood preserving facility consisted of an operations area, a drip track, and treated and untreated-wood storage areas. The operations area included wood-treating cylinders, chemical storage tanks, and a waste-water lagoon. Creosote and metallic salts were used in the operation. PAHs, VOCs, metals and components of creosote were detected in the soil, sediments, and ground water. The primary contaminants of concern affecting the ground water, soils, and sediments are VOCs including benzene, toluene, and xylenes, other organics including PAHs, and metal including arsenic, chromium, and lead. The selected remedial action for the site is outlined.

  6. Superfund Record of Decision (EPA Region 8): Woodbury Chemical, Commerce City, CO. (Second remedial action), September 1989. Final report

    SciTech Connect

    Not Available

    1989-09-29

    The Woodbury Chemical Site is in Commerce City, a northern suburb of Denver, Colorado, and neighbors a primarily industrial area which includes automobile salvage yards and a petroleum refinery. From the 1950s to 1971, the Woodbury Chemical Company operated a pesticide formulation facility which was destroyed by fire in 1965 but was subsequently rebuilt. Contaminated rubble and debris from the fire was disposed of on a 2.2-acre vacant lot east of the Woodbury facility. During a 1985 remedial investigation of the 2.2-acre lot, EPA identified high levels of pesticides and metals in surface and subsurface soils. As a result of the discovery of additional contamination, EPA determined it would be more cost effective to simultaneously implement the cleanup activities at the 2.2-acre lot, the Woodbury chemical facility, and adjacent properties. The selected remedial action addressed in the Record of Decision (ROD) incorporates and builds upon the 1985 ROD. The primary contaminants of concern affecting the soil are VOCs including PCE and TCE; other organics including pesticides; and metals including arsenic.

  7. Understanding Action beyond Imitation: Reversed Compatibility Effects of Action Observation in Imitation and Joint Action

    ERIC Educational Resources Information Center

    van Schie, Hein T.; van Waterschoot, Boris M.; Bekkering, Harold

    2008-01-01

    A robust finding in imitation literature is that people perform their actions more readily if they are congruent with the behavior of another person. These action congruency effects are typically explained by the idea that the observation of someone else acting automatically activates our motor system in a directly matching way. In the present…

  8. "Wuwei" (Non-Action) Philosophy and Actions: Rethinking "Actions" in School Reform

    ERIC Educational Resources Information Center

    Moon, Seungho

    2015-01-01

    This inquiry aims to enrich conversation regarding school reform. The author asks about what other discourses are possible when the action-oriented question of how to "act" is a major approach to "fix" current educational problems. Drawing from Taoist philosophy of "wuwei" (non-action), the author provides a frame to…

  9. Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1996--June 1996

    SciTech Connect

    1996-08-01

    This document summarizes significant enforcement actions that have been resolved during the period of January-June 1996. The report includes copies of Orders and Notices of Violations sent by the Nuclear Regulatory Commission to individuals with respect to the enforcement actions.

  10. National Practitioner Data Bank for Adverse Information on Physicians and Other Health Care Practitioners: reporting on adverse and negative actions. Final rule.

    PubMed

    2010-01-28

    This final rule revises existing regulations under sections 401 through 432 of the Health Care Quality Improvement Act of 1986, governing the National Practitioner Data Bank for Adverse Information on Physicians and Other Health Care Practitioners, to incorporate statutory requirements under section 1921 of the Social Security Act, as amended by section 5(b) of the Medicare and Medicaid Patient and Program Protection Act of 1987 (MMPPPA), and as amended by the Omnibus Budget Reconciliation Act of 1990 (OBRA). The MMPPPA, along with certain additional provisions in the OBRA, was designed to protect program beneficiaries from unfit health care practitioners, and otherwise improve the anti-fraud provisions of Medicare and State health care programs. Section 1921, the statutory authority upon which this regulatory action is based, requires each State to adopt a system of reporting to the Secretary of Health and Human Services (the Secretary) certain adverse licensure actions taken against health care practitioners and health care entities licensed or otherwise authorized by a State (or a political subdivision thereof) to provide health care services. It also requires each State to report any negative actions or findings that a State licensing authority, peer review organization, or private accreditation entity has concluded against a health care practitioner or health care entity.

  11. Final environmental impact statement for the Nevada Test Site and off-site locations in the state of Nevada: Mitigation action plan

    SciTech Connect

    1997-02-01

    The DOE Notice of Availability for this environmental impact statement was published in the Federal Register on Friday, October 18, 1996 (61 FR 54437). The final environmental impact statement identifies potential adverse effects resulting from the four use alternatives evaluated and discusses measures that DOE considered for the mitigation of these potential adverse effects. The Secretary of Energy signed the Record of Decision on the management and operation of the Nevada Test Site and other DOE sites in the state of Nevada on December 9, 1996. These decisions will result in the continuation of the multipurpose, multi-program use of the Nevada Test Site, under which DOE will pursue a further diversification of interagency, private industry, and public-education uses while meeting its Defense Program, Waste Management, and Environmental Restoration mission requirements at the Nevada Test Site and other Nevada sites, including the Tonopah Test Range, the Project Shoal Site, the Central Nevada Test Area, and on the Nellis Air Force Range Complex. The Record of Decision also identifies specific mitigation actions beyond the routine day-to-day physical and administrative controls needed for implementation of the decisions. These specific mitigation actions are focused on the transportation of waste and on groundwater availability. This Mitigation Action Plan elaborates on these mitigation commitments.

  12. [Humanitarian action threatened by standardization].

    PubMed

    Mamou, J

    2002-01-01

    The author analyses the new international context in which humanitarian action is being undertaken. He raises the problem caused by the diverging objectives of impartial, neutral humanitarianism and politically motivated actions that implement strategies of prevention and conflict resolution. He reviews the criticism that humanitarian has come under in recent years and that has resulted in establishment of codes of conduct. However he points out the threat that the concepts of control and "jurisdiction" over humanitarian action represent and analyzes discrepancies between minimal standards and universal principles. The article concludes with a presentation of an alternative solution based on the "Quality" platform being developed by several French NGOs.

  13. Action principle for relativistic magnetohydrodynamics

    NASA Astrophysics Data System (ADS)

    D'Avignon, Eric; Morrison, P. J.; Pegoraro, F.

    2015-04-01

    A covariant action principle for ideal relativistic magnetohydrodynamics in terms of natural Eulerian field variables is given. This is done by generalizing the covariant Poisson bracket theory of Marsden et al. [Ann. Phys. 169, 29 (1986)], which uses a noncanonical bracket to effect constrained variations of an action functional. Various implications and extensions of this action principle are also discussed. Two significant byproducts of this formalism are the introduction of a new divergence-free 4-vector variable for the magnetic field, and a new Lie-dragged form for the theory.

  14. American Samoa Energy Action Plan

    SciTech Connect

    Haase, Scott; Esterly, Sean; Herdrich, David; Bodell, Tim; Visser, Charles

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  15. Pulling out the Intentional Structure of Action: The Relation between Action Processing and Action Production in Infancy

    ERIC Educational Resources Information Center

    Sommerville, Jessica A.; Woodward, Amanda L.

    2005-01-01

    Adults and children readily construct action representations organized with respect to an ultimate goal. These representations allow one to predict the consequences of action, interpret and describe actions, and categorize action sequences. In this paper, we explore the ontogeny of hierarchically organized action representations, and its relation…

  16. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Remedial Action Selection Report, Appendix B of Attachment 2: Geology report, Final

    SciTech Connect

    Not Available

    1994-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section} 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which describes the proposed remedial action for the Naturita site. An extensive amount of data and supporting information has been generated and evaluated for this remedial action. These data and supporting information are not incorporated into this single document but are included or referenced in the supporting documents. The RAP consists of this RAS and four supporting documents or attachments. This Attachment 2, Geology Report describes the details of geologic, geomorphic, and seismic conditions at the Dry Flats disposal site.

  17. What's an Asthma Action Plan?

    MedlinePlus

    ... so that you (as well as your child's teachers, relatives, and caregivers) can respond as needed, even in stressful situations. previous continue Putting the Plan to Good Use Your child's action plan will be most ...

  18. National Wetlands Mitigation Action Plan

    EPA Pesticide Factsheets

    On December 26, 2002, EPA and the Corps of Engineers announced the release of a comprehensive, interagency National Wetlands Mitigation Action Plan to further achievement of the goal of no net loss of wetlands.

  19. Toluene Diisocyanates (TDI) Action Plan

    EPA Pesticide Factsheets

    This Action Plan addresses the use of toluene diisocyanate (TDI) and related compounds in products that may result in consumer and general population exposures, particularly in or around buildings, including homes and schools.

  20. The Concept of Action Research.

    ERIC Educational Resources Information Center

    Altrichter, Herbert; Kemmis, Stephen; McTaggart, Robin; Zuber-Skerritt, Ortrun

    2002-01-01

    Explains why definition of action research is problematic and presents working definitions developed internationally that indicate its nature, philosophy, and methodology. Suggests that pragmatic approaches to definition serve communication purposes without narrowly confining the concept. (SK)

  1. Method for triggering an action

    DOEpatents

    Hall, David R.; Bartholomew, David B.; Johnson, Monte L.; Moon, Justin; Koehler, Roger O.

    2006-10-17

    A method for triggering an action of at least one downhole device on a downhole network integrated into a downhole tool string synchronized to an event comprises determining latency, sending a latency adjusted signal, and performing the action. The latency is determined between a control device and the at least one downhole device. The latency adjusted signal for triggering an action is sent to the downhole device. The action is performed downhole synchronized to the event. A preferred method for determining latency comprises the steps: a control device sends a first signal to the downhole device; after receiving the signal, the downhole device sends a response signal to the control device; and the control device analyzes the time from sending the signal to receiving the response signal.

  2. Rio San Jose Action Memo

    EPA Pesticide Factsheets

    This memorandum requests approval for a time-critical removal action at the II residential properties that compose the Rio San Jose Radiation Site located in Laguna, Mesita, Paraje, and Seama, Pueblo of Laguna located in Cibola County, New Mexico.

  3. ICDF Complex Remedial Action Report

    SciTech Connect

    W. M. Heileson

    2007-09-26

    This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

  4. On extending actions of groups

    SciTech Connect

    Ageev, Sergei M; Repovs, Dusan

    2010-02-28

    Problems of dense and closed extension of actions of compact transformation groups are solved. The method developed in the paper is applied to problems of extension of equivariant maps and of construction of equivariant compactifications. Bibliography: 27 titles.

  5. InterAction Database (IADB)

    Cancer.gov

    The InterAction Database includes demographic and prescription information for more than 500,000 patients in the northern and middle Netherlands and has been integrated with other systems to enhance data collection and analysis.

  6. Technology assessment and citizen action

    NASA Technical Reports Server (NTRS)

    Mottur, E. R.

    1972-01-01

    The importance of citizen participation in the assessment process is discussed, and a system for citizen assessment action is proposed. A national assessment system is outlined. Citizen participation is considered essential in the assessment process, and impediments to effective action taken by citizens are discussed. These impediments are finance, organization and motivation, and information. The establishment of citizens' assessment associations is proposed, whose functioning would be fostered and regulated by the Citizens' Assessment Administration. The organization, functions, and financing of these associations are described. The implications of citizen action are indicated as the extensive use of class action suits, the broad interpretation of associated costs of litigation, and the use of present scientific research as evidence to assert that it is reasonable to conclude that certain consequences are probable to occur in the future.

  7. CSC Tip Sheets: Action Checklists

    EPA Pesticide Factsheets

    Action checklists motivate behavior change by providing a clear and concise list of activities that community members and organizations can use to reduce their carbon footprint and achieve other sustainability goals.

  8. Action representation: crosstalk between semantics and pragmatics.

    PubMed

    Prinz, Wolfgang

    2014-03-01

    Marc Jeannerod pioneered a representational approach to movement and action. In his approach, motor representations provide both, declarative knowledge about action and procedural knowledge for action (action semantics and action pragmatics, respectively). Recent evidence from language comprehension and action simulation supports the claim that action pragmatics and action semantics draw on common representational resources, thus challenging the traditional divide between declarative and procedural action knowledge. To account for these observations, three kinds of theoretical frameworks are discussed: (i) semantics is grounded in pragmatics, (ii) pragmatics is anchored in semantics, and (iii) pragmatics is part and parcel of semantics.

  9. Complexity, action, and black holes

    DOE PAGES

    Brown, Adam R.; Roberts, Daniel A.; Susskind, Leonard; ...

    2016-04-18

    In an earlier paper "Complexity Equals Action" we conjectured that the quantum computational complexity of a holographic state is given by the classical action of a region in the bulk (the `Wheeler-DeWitt' patch). We provide calculations for the results quoted in that paper, explain how it fits into a broader (tensor) network of ideas, and elaborate on the hypothesis that black holes are the fastest computers in nature.

  10. Complexity, action, and black holes

    NASA Astrophysics Data System (ADS)

    Brown, Adam R.; Roberts, Daniel A.; Susskind, Leonard; Swingle, Brian; Zhao, Ying

    2016-04-01

    Our earlier paper "Complexity Equals Action" conjectured that the quantum computational complexity of a holographic state is given by the classical action of a region in the bulk (the "Wheeler-DeWitt" patch). We provide calculations for the results quoted in that paper, explain how it fits into a broader (tensor) network of ideas, and elaborate on the hypothesis that black holes are the fastest computers in nature.

  11. Holst actions for supergravity theories

    NASA Astrophysics Data System (ADS)

    Kaul, Romesh K.

    2008-02-01

    The Holst action containing the Immirzi parameter for pure gravity is generalized to supergravity theories. Supergravity equations of motion are not modified by such generalizations, thus preserving supersymmetry. Dependence on the Immirzi parameter does not emerge in the classical equations of motion. This is in contrast with the recent observation of Perez and Rovelli for gravity action containing the original Holst term and a minimally coupled Dirac fermion, where the classical equations of motion do develop a dependence on the Immirzi parameter.

  12. Gauge action improvement and smearing

    NASA Astrophysics Data System (ADS)

    Dürr, Stephan

    2005-11-01

    The effect of repeatedly smearing SU(3) gauge configurations is investigated. Six gauge actions (Wilson, Symanzik, Iwasaki, DBW2, Beinlich-Karsch-Laermann, Langfeld; combined with a direct SU(3)-overrelaxation step) and three smearings (APE, HYP, EXP) are compared. The impact on large Wilson loops is monitored, confirming the signal-to-noise prediction by Lepage. The fat-link definition of the "naive" topological charge proves most useful on improved action ensembles.

  13. Tactile perception during action observation.

    PubMed

    Vastano, Roberta; Inuggi, Alberto; Vargas, Claudia D; Baud-Bovy, Gabriel; Jacono, Marco; Pozzo, Thierry

    2016-09-01

    It has been suggested that tactile perception becomes less acute during movement to optimize motor control and to prevent an overload of afferent information generated during action. This empirical phenomenon, known as "tactile gating effect," has been associated with mechanisms of sensory feedback prediction. However, less attention has been given to the tactile attenuation effect during the observation of an action. The aim of this study was to investigate whether and how the observation of a goal-directed action influences tactile perception as during overt action. In a first experiment, we recorded vocal reaction times (RTs) of participants to tactile stimulations during the observation of a reach-to-grasp action. The stimulations were delivered on different body parts that could be either congruent or incongruent with the observed effector (the right hand and the right leg, respectively). The tactile stimulation was contrasted with a no body-related stimulation (an auditory beep). We found increased RTs for tactile congruent stimuli compared to both tactile incongruent and auditory stimuli. This effect was reported only during the observation of the reaching phase, whereas RTs were not modulated during the grasping phase. A tactile two-alternative forced-choice (2AFC) discrimination task was then conducted in order to quantify the changes in tactile sensitivity during the observation of the same goal-directed actions. In agreement with the first experiment, the tactile perceived intensity was reduced only during the reaching phase. These results suggest that tactile processing during action observation relies on a process similar to that occurring during action execution.

  14. Seeking Conceptual Clarity in the Action Modalities

    ERIC Educational Resources Information Center

    Raelin, Joe

    2009-01-01

    This article begins with the presumption that action learning has not made as deep an impact in promoting participatory social change as its supporters may have hoped for, but nor has its cousin action modalities, such as action research and action science. These action strategies have evolved separately along distinct traditions and, rather than…

  15. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  16. Segmenting Dynamic Human Action via Statistical Structure

    ERIC Educational Resources Information Center

    Baldwin, Dare; Andersson, Annika; Saffran, Jenny; Meyer, Meredith

    2008-01-01

    Human social, cognitive, and linguistic functioning depends on skills for rapidly processing action. Identifying distinct acts within the dynamic motion flow is one basic component of action processing; for example, skill at segmenting action is foundational to action categorization, verb learning, and comprehension of novel action sequences. Yet…

  17. 49 CFR 106.110 - Appealing a PHMSA Action.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Appealing a PHMSA Action. 106.110 Section 106.110... Participating in the Rulemaking Process Appeals § 106.110 Appealing a PHMSA Action. You may appeal the following PHMSA actions: (a) PHMSA's issuance of a final rule or PHMSA's withdrawal of a notice of...

  18. 49 CFR 106.110 - Appealing a PHMSA Action.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 2 2012-10-01 2012-10-01 false Appealing a PHMSA Action. 106.110 Section 106.110... Participating in the Rulemaking Process Appeals § 106.110 Appealing a PHMSA Action. You may appeal the following PHMSA actions: (a) PHMSA's issuance of a final rule or PHMSA's withdrawal of a notice of...

  19. 49 CFR 106.110 - Appealing a PHMSA Action.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 2 2013-10-01 2013-10-01 false Appealing a PHMSA Action. 106.110 Section 106.110... Participating in the Rulemaking Process Appeals § 106.110 Appealing a PHMSA Action. You may appeal the following PHMSA actions: (a) PHMSA's issuance of a final rule or PHMSA's withdrawal of a notice of...

  20. 49 CFR 106.110 - Appealing a PHMSA Action.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 2 2011-10-01 2011-10-01 false Appealing a PHMSA Action. 106.110 Section 106.110... Participating in the Rulemaking Process Appeals § 106.110 Appealing a PHMSA Action. You may appeal the following PHMSA actions: (a) PHMSA's issuance of a final rule or PHMSA's withdrawal of a notice of...

  1. 49 CFR 106.110 - Appealing a PHMSA Action.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Appealing a PHMSA Action. 106.110 Section 106.110... Participating in the Rulemaking Process Appeals § 106.110 Appealing a PHMSA Action. You may appeal the following PHMSA actions: (a) PHMSA's issuance of a final rule or PHMSA's withdrawal of a notice of...

  2. Enforcement actions: Significant actions resolved individuals actions. Semiannual progress report, July--December 1996

    SciTech Connect

    1997-04-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (July - December 1996) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to-these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  3. Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1997--June 1997

    SciTech Connect

    1997-09-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (January - June 1997) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  4. 78 FR 18420 - Special Permit Applications Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Pipeline and Hazardous Materials Safety Administration Special Permit Applications Actions AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of actions on special... processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49...

  5. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho. Final report

    SciTech Connect

    Matthews, M.L.; Nagel, J.

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho.

  6. Remedial Action Plan for the codisposal and stabilization of the Monument Valley and Mexican Hat uranium mill tailings at Mexican Hat, Utah: Appendices C--E. Final report

    SciTech Connect

    1993-02-01

    This document provides appendices C, D, and E this Remedial Action Plan (RAP) which is a revision of the original Mexican Hat Remedial Action Plan and RAP Modification submitted in July 1988 and January 1989, respectively, along with updated design documents. Appendix C provide the Radiological Support Plan, Appendix D provides the Site Characterization, and Appendix E provides the Water Resources Protection Strategy.

  7. Pennsylvania Action Research Network (PA-ARN) Staff Development through Five Regional Staff Development Centers. Final Report, July 1998-June 1999.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., McKeesport.

    With the existence of 67 monographs and approximately 60 practitioners trained in action research in the western and central parts of Pennsylvania from project years 1995-98, the 1998-99 Section 353 project expanded the action research network (ARN) to include teachers, administrators, and researchers in the northeastern and southeastern parts of…

  8. Pennsylvania Action Research Network (PA-ARN) Staff Development through Five Regional Staff Development Centers. Final Report. July 1997-June 1998.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., McKeesport.

    The Pennsylvania Action Research Network project was initiated in 1995-1996 to provide Pennsylvania literacy educators with the following: a better method for taking published research findings and testing and adapting them in their own classrooms; a way to study their own research ideas on a daily-action basis; and a systematic way to share and…

  9. Shaping up for action

    PubMed Central

    Denholm, Barry

    2013-01-01

    The Malpighian tubule is the main organ for excretion and osmoregulation in most insects. During a short period of embryonic development the tubules of Drosophila are shaped, undergo differentiation and become precisely positioned in the body cavity, so they become fully functional at the time of larval hatching a few hours later. In this review I explore three developmental events on the path to physiological maturation. First, I examine the molecular and cellular mechanisms that generate organ shape, focusing on the process of cell intercalation that drives tubule elongation, the roles of the cytoskeleton, the extracellular matrix and how intercalation is coordinated at the tissue level. Second, I look at the genetic networks that control the physiological differentiation of tubule cells and consider how distinctive physiological domains in the tubule are patterned. Finally, I explore how the organ is positioned within the body cavity and consider the relationship between organ position and function. PMID:23445869

  10. Efficient computation of optimal actions.

    PubMed

    Todorov, Emanuel

    2009-07-14

    Optimal choice of actions is a fundamental problem relevant to fields as diverse as neuroscience, psychology, economics, computer science, and control engineering. Despite this broad relevance the abstract setting is similar: we have an agent choosing actions over time, an uncertain dynamical system whose state is affected by those actions, and a performance criterion that the agent seeks to optimize. Solving problems of this kind remains hard, in part, because of overly generic formulations. Here, we propose a more structured formulation that greatly simplifies the construction of optimal control laws in both discrete and continuous domains. An exhaustive search over actions is avoided and the problem becomes linear. This yields algorithms that outperform Dynamic Programming and Reinforcement Learning, and thereby solve traditional problems more efficiently. Our framework also enables computations that were not possible before: composing optimal control laws by mixing primitives, applying deterministic methods to stochastic systems, quantifying the benefits of error tolerance, and inferring goals from behavioral data via convex optimization. Development of a general class of easily solvable problems tends to accelerate progress--as linear systems theory has done, for example. Our framework may have similar impact in fields where optimal choice of actions is relevant.

  11. The functional neuroanatomy of actions.

    PubMed

    Watson, Christine E; Chatterjee, Anjan

    2011-04-19

    Our current understanding of the neural basis of semantic memory is informed primarily by studies of concrete objects. However, conceptual knowledge encompasses many other, albeit less concrete, domains. This article reviews evidence from neuroimaging and patient studies that speaks to the neural basis of action concepts and the words that refer to them. These data highlight 2 important principles governing the neural instantiation of semantic knowledge. First, the organization of conceptual representations in the brain parallels perception and action. Action concepts are at least partially represented within modality-specific areas responsible for the perception and execution of dynamic actions. Second, unimodal sensory and motor cortices act as "points of entry" for more abstract action knowledge. Increasingly abstract conceptual knowledge derived from these modalities is represented in brain areas located anterior and centripetal to modality-specific regions. Extending research on the neural basis of semantics to include dynamic and relational aspects of the world gives us a more complete appreciation of the range of cognitive and communication impairments that may be experienced by patients with neurologic disease.

  12. Efficient computation of optimal actions

    PubMed Central

    Todorov, Emanuel

    2009-01-01

    Optimal choice of actions is a fundamental problem relevant to fields as diverse as neuroscience, psychology, economics, computer science, and control engineering. Despite this broad relevance the abstract setting is similar: we have an agent choosing actions over time, an uncertain dynamical system whose state is affected by those actions, and a performance criterion that the agent seeks to optimize. Solving problems of this kind remains hard, in part, because of overly generic formulations. Here, we propose a more structured formulation that greatly simplifies the construction of optimal control laws in both discrete and continuous domains. An exhaustive search over actions is avoided and the problem becomes linear. This yields algorithms that outperform Dynamic Programming and Reinforcement Learning, and thereby solve traditional problems more efficiently. Our framework also enables computations that were not possible before: composing optimal control laws by mixing primitives, applying deterministic methods to stochastic systems, quantifying the benefits of error tolerance, and inferring goals from behavioral data via convex optimization. Development of a general class of easily solvable problems tends to accelerate progress—as linear systems theory has done, for example. Our framework may have similar impact in fields where optimal choice of actions is relevant. PMID:19574462

  13. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Rifle, Colorado. Volume 1, Text: Appendices A, B, and C: Final report

    SciTech Connect

    1990-02-01

    This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Rifle sites. That remedial action consists of removing approximately 4,185,000 cubic yards (cy) of tailings and contaminated materials from their current locations, transporting, and stabilizing the tailings material at the Estes Gulch disposal site, approximately six miles north of Rifle. The tailings and contaminated materials are comprised of approximately 597,000 cy from Old Rifle, 3,232,000 cy from New Rifle, and 322,000 cy from vicinity properties and about 34,000 cy from demolition. The remedial action plan includes specific design requirements for the detailed design and construction of the remedial action. An extensive amount of data and supporting information have been generated for this remedial action and cannot all be incorporated into this document. Pertinent information and data are included with reference given to the supporting documents.

  14. Affirmative Action and the Issue of Expectancies.

    ERIC Educational Resources Information Center

    Crosby, Faye; Clayton, Susan

    1990-01-01

    Discusses the impact of affirmative action policies on expectancies and interpersonal relations. Concludes that affirmative action policies offer clear advantages to the members of target groups. (DM)

  15. Relaxation of Summer Gasoline Volatility Standard for Mecklenburg and Gaston counties, North Carolina Direct final action Additional Resources

    EPA Pesticide Factsheets

    Supporting documents on EPA's final rule that relaxes the federal Reid Vapor Pressure (RVP) standard applicable to gasoline sold in Mecklenburg and Gaston counties, North Carolina during the summer season (June 1st to September 15th) are provided.

  16. A Synthesis of Action Research on Coaching

    ERIC Educational Resources Information Center

    Day, Nicole Kristine

    2015-01-01

    This paper reviews data from 27 final reports of action research projects in the area of instructional coaching undertaken as part of Cycle 4 (2008-2010) of the Alberta Initiative for School Improvement (AISI). AISI was an Alberta government programme that provided funding to every school district to allow teachers to create site-based, action…

  17. ICDF Complex Remedial Action Work Plan

    SciTech Connect

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  18. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    SciTech Connect

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  19. Superfund Record of Decision (EPA Region 6): United Creosoting Company, Conroe, Montgomery County, Texas (Second remedial action), September 1989. Final report

    SciTech Connect

    Not Available

    1989-09-29

    The 100-acre United Creosoting site is in Conroe, Montgomery County, Texas. The site currently is occupied by a distributing company, a construction company, and a residential subdivision. From 1946 to 1972, the United Creosoting Company operated a wood preserving facility at the site which used PCPs and creosote in the wood preservation process. PCP and creosote wastes were stored in two waste ponds on the property of the distributing company. In 1983, due to the contaminated stormwater runoff from the former waste pond areas, the property owner was directed under terms of an EPA Administrative Order to regrade contaminated soil, divert surface water drainage away from the residential portion of the site, and cap contaminated soil. The Record of Decision (ROD) specifies a final remedy for the contaminated soil and complements a 1986 ROD which determined that no action is necessary to remediate shallow ground water. The primary contaminants of concern affecting the soil are organics including PAHs, PCPs, and dioxins. The selected remedial action for this site are included.

  20. Flyby Anomaly via Least Action

    NASA Astrophysics Data System (ADS)

    Annila, A.

    2017-04-01

    The observed but unexpected changes in velocity during spacecraft flybys of Earth are examined using the principle of least action in its original dissipative form. In general, the spacecraft's momentum will change when it travels through an energy density gradient of space that is enfolding a gravitating, orbiting and rotating body. When space is understood as a physical substance that embodies quanta of actions, rather than being modeled by a mere metric, it becomes apparent that the changes in momentum couple with flux of quanta from the local system of bodies to the universal surroundings or vice versa. In this way the original least-action principle accounts also for the 'anomalous' change in velocity by an equation of motion which complies with the empirical relation that has been deduced from Earth-flybys.

  1. Remedial Action Contacts Directory - 1997

    SciTech Connect

    1997-05-01

    This document, which was prepared for the US Department of Energy (DOE) Office of Environmental Restoration (ER), is a directory of 2628 individuals interested or involved in environmental restoration and/or remedial actions at radioactively contaminated sites. This directory contains a list of mailing addresses and phone numbers of DOE operations, area, site, project, and contractor offices; an index of DOE operations, area, site, project, and contractor office sorted by state; a list of individuals, presented by last name, facsimile number, and e-mail address; an index of affiliations presented alphabetically, with individual contacts appearing below each affiliation name; and an index of foreign contacta sorted by country and affiliation. This document was generated from the Remedial Action Contacts Database, which is maintained by the Remedial Action Program Information Center (RAPIC).

  2. Cardiotonic action of two tannins

    PubMed Central

    Broadbent, J. L.

    1962-01-01

    A tannin isolated from Paullinia pinnata Linn., and tannic acid, have cardiotonic actions on the isolated perfused frog heart. Paullinia tannin is more firmly “fixed” than tannic acid. Tannin solutions contain peroxide, but the cardiotonic action is not dependent on this, since drugs believed to prevent peroxide formation, and sodium pyruvate which destroys peroxides, do not prevent the cardiotonic action. Maximal stimulation by tannin greatly reduces subsequent stimulation by ouabain. If calcium is omitted from the Ringer solution tannins cannot stimulate the heart. In this respect they differ from ouabain. However, the ouabain stimulation can be prevented by prior perfusion with tannin. It is suggested that the antagonism between tannin and ouabain is due to the former preventing ouabain from reaching its receptor sites, and that tannin stimulation is dependent on the formation of a calcium-tannin complex at the heart surface. In the isolated perfused mammalian heart preparation tannins increase diastolic tonus and coronary flow. PMID:13873207

  3. Characterization of Final Action Official Method(SM) 2011.19 and First Action Official Method 2015.06 Performance at Analyte Levels Corresponding to CODEX STAN 72 (1981) Minimum Levels.

    PubMed

    Thompson, Joseph J; Pacquette, Lawrence H

    2017-03-01

    A limited single-laboratory validation (SLV) was conducted in the authors' laboratory to investigate the performance of AOAC Official MethodsSM 2011.19 Determination of Chromium (Cr), Selenium (Se), and Molybdenum (Mo) in Infant Formula and Adult Nutritional Products by Inductively Coupled Plasma/Mass Spectrometry and 2015.06 Determination of Minerals and Trace Elements in Infant Formula and Adult/Pediatric Nutritional Formula by Inductively Coupled Plasma/Mass Spectrometry at analyte levels below the practical LOQs (PLOQs) already published for these Final Action Official Methods. This work was needed to verify that the actual LOQs were below the minimum requirements for minerals in infant formula as given in CODEX STAN 72 (1981). Linearity studies at low levels were conducted as well as the analysis of blanks over multiple days to establish the LOQs (as opposed to PLOQs) for these nutrients. Several placebo matrixes from the AOAC Stakeholder Panel on Infant Formula and Adult Nutritionals (SPIFAN) program were tested over multiple days at two different sample sizes to quantitate the effect of doubling the sample size given in the original publications. The SLV results indicate that both methods can meet the Codex minimum requirements as-is, without modification of the methods, albeit with a relaxation of the stringent precision criteria originally established for these methods by SPIFAN. Precision can be improved by doubling the sample size, but this step is not necessary to use the method for its intended purpose. A concurrent collaborative study of Method 2015.06 showed that the RSDR obtained across eight laboratories for several infant formula placebos containing mineral concentrations between the PLOQ and LOQ were indeed worse than SPIFAN expectations, but reasonable Horwitz ratios (HorRat) were nonetheless obtained for these analytes.

  4. Crossing the Boulevard: The Action of Genre as Social Action

    ERIC Educational Resources Information Center

    Devitt, Amy J.

    2015-01-01

    This article describes the author's first encounter with Carolyn Miller's "Genre as Social Action," and how the article opened the genre scholarship in rhetoric and communication, and led the author to integrate previous knowledge of linguistics and composition studies with communication studies and rhetoric more generally. Miller's…

  5. Action Learning in ActionAid Nepal: A Case Study

    ERIC Educational Resources Information Center

    Lustig, Patricia; Rai, Deep Ranjani

    2009-01-01

    This article describes an example of how action learning was used as a framework for an organisational intervention to fundamentally change the organisational culture over a period of time. It also identifies our learning over that period of time and what worked well (and not so well) in an International Non-Governmental Organisation in Nepal.

  6. Its All Action, Its All Learning: Action Learning in SMEs

    ERIC Educational Resources Information Center

    Clarke, Jean; Thorpe, Richard; Anderson, Lisa; Gold, Jeff

    2006-01-01

    Purpose: The purpose of this paper is to argue that action learning (AL) may provide a means of successfully developing small to medium-sized enterprises (SMEs). Design/methodology/approach: The literature around SME learning suggests a number of processes are important for SME learning which similarity, it is argued, are encompassed in AL. AL may…

  7. Texas Solar Collaboration Action Plan

    SciTech Connect

    Winland, Chris

    2013-02-14

    Texas Solar Collaboration Permitting and Interconenction Process Improvement Action Plan. San Antonio-specific; Investigate feasibility of using electronic signatures; Investigate feasibility of enabling other online permitting processes (e.g., commercial); Assess need for future document management and workflow/notification IT improvements; Update Information Bulletin 153 regarding City requirements and processes for PV; Educate contractors and public on CPS Energy’s new 2013 solar program processes; Continue to discuss “downtown grid” interconnection issues and identify potential solutions; Consider renaming Distributed Energy Resources (DER); and Continue to participate in collaborative actions.

  8. 78 FR 40545 - Notice of Final Federal Agency Action on Proposed Highway in Georgia the Interstate 75 (I-75...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ... Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The I-75 Express Lanes Project will design a managed lane system along I-75 from the SR 155 (Zack Hinton Parkway, South) interchange... Interstate 75 (I-75) Express, Clayton and Henry Counties, Georgia (Atlanta Metropolitan Area) AGENCY:...

  9. 76 FR 79755 - Notice of Final Federal Agency Actions on the Interstate 95 High Occupancy Toll Lanes Project in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... facilitate movement between the HOV/HOT lanes and the general purpose lanes. Pull-off areas will also be... letter finalizing the Environmental Assessment process and requesting a Finding of No Significant Impact... Preservation Act of 1966, as amended [16 U.S.C. 470(f) et seq.]. 6. Social and Economic: Farmland...

  10. Sunset dates of chemicals subject to final TSCA section 4: test requirements and related section 12(b) actions

    EPA Pesticide Factsheets

    This table lists all chemical substances and mixtures that are and/or have been the subject of final TSCA Section 4 test rules and/or TSCA Section 4 enforceable consent agreements/orders (ECAs) issued under the TSCA Existing Chemicals Testing Program.

  11. Action feedback affects the perception of action-related objects beyond actual action success.

    PubMed

    Kirsch, Wladimir; Königstein, Elisabeth; Kunde, Wilfried

    2014-01-01

    Successful object-oriented action typically increases the perceived size of aimed target objects. This phenomenon has been assumed to reflect an impact of an actor's current action ability on visual perception. The actual action ability and the explicit knowledge of action outcome, however, were confounded in previous studies. The present experiments aimed at disentangling these two factors. Participants repeatedly tried to hit a circular target varying in size with a stylus movement under restricted feedback conditions. After each movement they were explicitly informed about the success in hitting the target and were then asked to judge target size. The explicit feedback regarding movement success was manipulated orthogonally to actual movement success. The results of three experiments indicated the participants' bias to judge relatively small targets as larger and relatively large targets as smaller after explicit feedback of failure than after explicit feedback of success. This pattern was independent of the actual motor performance, suggesting that the actors' evaluations of motor actions may bias perception of target objects in itself.

  12. Supporting evaluation for the proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    SciTech Connect

    2003-08-06

    This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).

  13. Superfund Record of Decision (EPA Region 2): Higgins Farm, Franklin Township, Somerset County, NJ. (Second remedial action), September 1992. Final report

    SciTech Connect

    Not Available

    1992-09-30

    The 75-acre Higgins Farm site is a former cattle farm in Franklin Township, Somerset County, New Jersey. During the 1960's, municipal sludge and penicillin waste were used as fertilizers on Higgins Farm. The site also contains three holding tanks and drums containing material removed from previous remedial investigations. In 1986, the owner excavated 50 containers, including drums; however, during excavation activities, some of the containers were punctured and their contents spilled onto the ground. The ROD addresses the final action for ground water to limit future migration of contaminated ground water to offsite areas, as OU2. The primary contaminants of concern affecting the ground water are VOCs, including benzene, PCE, TCE, and xylene.

  14. Superfund Record of Decision (EPA Region 8): Broderick Wood Products, Operable Unit 2, Adams County, Co. (Second remedial action), March 1992. Final report

    SciTech Connect

    Not Available

    1992-03-24

    The 64-acre Broderick Wood Products (BWP) site is a former wood preserving facility in unincorporated Adams County, Colorado, located just outside of Denver, Colorado. Land use in the area is predominantly industrial. There are three aquifers below the site. Approximately 70 drums containing various chemicals, oils, and asbestos are stored in the process area, and 65 drums of oil from sludge are stored in the impoundment area of the site. The ROD addresses OU2, a final remedy for the BWP site. The primary contaminants of concern affecting the soil, debris, sediment, and ground water are VOCs, including benzene, toluene, and xylenes; organics, including PAHs, dioxins, furans, and PCP and other phenolic compounds; and metals, including arsenic and lead. The selected remedial action for the site includes treatment of the debris, soil and sediments, and ground water.

  15. Food and Drug Administration Review and Action on Over-the-Counter Time and Extent Applications. Final rule.

    PubMed

    2016-11-23

    The Food and Drug Administration (FDA or Agency) is amending its nonprescription (over-the-counter or OTC) drug regulations. This final rule supplements the time and extent application (TEA) process for OTC drugs by establishing timelines and performance metrics for FDA's review of non-sunscreen TEAs, as required by the Sunscreen Innovation Act (SIA). It also amends the existing TEA process to include filing determination and withdrawal provisions to make the TEA process more efficient.

  16. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report: Attachment 2, Geology report; Attachment 3, Groundwater hydrology report; Attachment 4, Water resources protection strategy: Final report

    SciTech Connect

    Chernoff, A.R.; Lacker, D.K.

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  17. Affirmative Action in Higher Education.

    ERIC Educational Resources Information Center

    Young, D. Parker

    Stated as a legal constitutional issue the question is, Do affirmative action programs that embody some form of preferential treatment of selected groups resulting in possible quotas constitute reverse discrimination in violation of basic constitutional rights? This issue represents one of the most fundamental questions for our society that the…

  18. Learning to Internalize Action Dialogue

    ERIC Educational Resources Information Center

    Cotter, Teresa Ellen

    2011-01-01

    The purpose of this case study was to explore how participants of a communications workshop, "Action Dialogue," perceived their ability to engage in dialogue was improved and enhanced. The study was based on the following assumptions: (1) dialogue skills can be learned and people are able to learn these skills; (2) context and emotion influence…

  19. 76 FR 80847 - Enforcement Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Compliance is a Goal of the Commission The proposed draft sets out voluntary compliance as a goal of the... into compliance before an enforcement action is taken by the Chair. Voluntary compliance is the goal of the Commission. This amendment sets forth how Commission staff and tribes may address potential...

  20. Talent Management: Emphasis on Action

    ERIC Educational Resources Information Center

    Butterfield, Barbara

    2008-01-01

    Recent discussions among HR practitioners in higher education have focused on talent management; specifically, the concept of developing a college or university talent management approach balanced between planning and action. Talent management as a planning tool looks very similar to workforce planning, but where HR will experience a real…

  1. Translating Education Reform into Action

    ERIC Educational Resources Information Center

    Reville, Paul

    2010-01-01

    A lot of national attention was paid over the past few months to a situation in Central Falls, Rhode Island, where the superintendent took the action of firing all the high school's teachers. What started off as a small story about a labor dispute between the administration and the teachers' union at the high school catapulted into the national…

  2. State Governance Action Report, 2008

    ERIC Educational Resources Information Center

    Ogle, Greg

    2008-01-01

    This is the fifth edition of the State Governance Action Report that has been produced since 2000 by the Association of Governing Boards of Universities and Colleges' (AGB's) Ingram Center for Public Trusteeship and Governance. Focusing primarily on state and higher education policies directly affecting governance, trusteeship, and institutionally…

  3. One School's Positive Action Plan.

    ERIC Educational Resources Information Center

    McCormack, Sammie

    Because they felt that students can be responsible for their own behavior, the staff of Jefferson Elementary School, serving 300 students in grades 1 through 4 in a small rural community, developed a program which promoted self-management. In September 1979, teachers participated in an assertive discipline workshop. A Positive Action Plan evolved,…

  4. Action Learning Enabled Strategy Making

    ERIC Educational Resources Information Center

    Oliver, John

    2008-01-01

    Action learning encourages individual reflection, insightful questioning and assumption breaking that result in changes in attitude and behaviour. This learning process provides the potential to explore and solve complex organizational problems such as the question of how to develop a future business strategy. Existing literature on the process of…

  5. Rank Pooling for Action Recognition.

    PubMed

    Fernando, Basura; Gavves, Efstratios; Oramas M, Jose Oramas; Ghodrati, Amir; Tuytelaars, Tinne

    2017-04-01

    We propose a function-based temporal pooling method that captures the latent structure of the video sequence data - e.g., how frame-level features evolve over time in a video. We show how the parameters of a function that has been fit to the video data can serve as a robust new video representation. As a specific example, we learn a pooling function via ranking machines. By learning to rank the frame-level features of a video in chronological order, we obtain a new representation that captures the video-wide temporal dynamics of a video, suitable for action recognition. Other than ranking functions, we explore different parametric models that could also explain the temporal changes in videos. The proposed functional pooling methods, and rank pooling in particular, is easy to interpret and implement, fast to compute and effective in recognizing a wide variety of actions. We evaluate our method on various benchmarks for generic action, fine-grained action and gesture recognition. Results show that rank pooling brings an absolute improvement of 7-10 average pooling baseline. At the same time, rank pooling is compatible with and complementary to several appearance and local motion based methods and features, such as improved trajectories and deep learning features.

  6. Disaster: Prevention, Preparedness and Action.

    ERIC Educational Resources Information Center

    Buchanan, Sally

    1981-01-01

    Discission of threat of disaster to library archival materials focuses on prevention (building maintenance, materials storage, fire prevention), preparedness (preplanning, procedures for handling emergencies, finances of recovery operation), and action (instructions for handling damaged materials). Current library activities in disaster planning…

  7. Ecology and Energy Action Pack.

    ERIC Educational Resources Information Center

    McDonald's Corp., Oak Brook, IL.

    One of five McDonald's Action Packs, these elementary school-level instructional materials are for use as an introduction to existing units of study, supplements to a textbook, or a source of special projects for environmental education. Contents include these six units: Make Your Own Ecology Mini-spinner, Let's Look at a Food Chain, Drip the…

  8. Action Learning in John Lewis

    ERIC Educational Resources Information Center

    Spencer, Chris

    2005-01-01

    A small group of training professionals within the John Lewis Partnership set up an action learning group about 2 years ago. The main aim was to explore the technique for our own learning and development. The timing and lifespan of the group reflected the generally strategic and long-term nature of our projects. One of these was to introduce…

  9. The Alchemy of Action Learning

    ERIC Educational Resources Information Center

    West, Penny; Choueke, Richard

    2003-01-01

    This paper examines the authors' experiences as action learning set facilitators within a public sector organisation undergoing change. Our objectives were to assist in the identification of internal and external drivers for change and to work with the set to explore how people's roles and responsibilities might be enhanced and developed in a…

  10. Team Challenge and Action Learning

    ERIC Educational Resources Information Center

    Holmes, Mary

    2010-01-01

    This article describes how action learning can be accompanied by a project to encourage shared learning about organisation culture, the external environment, political context and team dynamics, while allowing space for personal issues. It drives forward reflective practice and encourages sets to deliver a tangible pay-back to the organisation.…

  11. Gravitational action with null boundaries

    NASA Astrophysics Data System (ADS)

    Lehner, Luis; Myers, Robert C.; Poisson, Eric; Sorkin, Rafael D.

    2016-10-01

    We present a complete discussion of the boundary term in the action functional of general relativity when the boundary includes null segments in addition to the more usual timelike and spacelike segments. We confirm that ambiguities appear in the contribution from a null segment, because it depends on an arbitrary choice of parametrization for the generators. We also show that similar ambiguities appear in the contribution from a codimension-two surface at which a null segment is joined to another (spacelike, timelike, or null) segment. The parametrization ambiguity can be tamed by insisting that the null generators be affinely parametrized; this forces each null contribution to the boundary action to vanish, but leaves intact the fredom to rescale the affine parameter by a constant factor on each generator. Once a choice of parametrization is made, the ambiguity in the joint contributions can be eliminated by formulating well-motivated rules that ensure the additivity of the gravitational action. Enforcing these rules, we calculate the time rate of change of the action when it is evaluated for a so-called "Wheeler-DeWitt patch" of a black hole in asymptotically anti de Sitter space. We recover a number of results cited in the literature, obtained with a less complete analysis.

  12. John Rawls and Affirmative Action.

    ERIC Educational Resources Information Center

    Nagel, Thomas

    2003-01-01

    Discusses the philosophy of John Rawls, asserting that although Rawls never wrote about affirmative action, his ideas are relevant to the issue. Rawls concentrated on "ideal theory," which he believed was the theory of what constituted a truly just society. He considered slavery and racial segregation paradigms of injustice. His ideal…

  13. Learners in Action, Summer 2005

    ERIC Educational Resources Information Center

    Movement for Canadian Literacy, 2005

    2005-01-01

    This Summer 2005 issue of "Learners in Action" contains the following articles: (1) Bridging Barriers to Learning (Glenn Kissman); (2) Education Really Is a Family Affair; (3) Sabrina's Story; (4) SARAW Helps Students Find Their Voice; (5) Literacy Changes Lives; and (6) Seeing STARs in Alberta.

  14. State Governance Action Report, 2007

    ERIC Educational Resources Information Center

    Association of Governing Boards of Universities and Colleges, 2007

    2007-01-01

    This paper presents the State Governance Action Report for 2007. Compiled in this report are state policy developments, including legislation, commissions, and studies, affecting the structure, responsibilities, and operations of public higher education governing boards and institutionally related foundations. Governance and governance-related…

  15. Legislative Actions Affecting Higher Education.

    ERIC Educational Resources Information Center

    Washington State Council for Postsecondary Education, Olympia.

    Legislative actions pertaining to Washington public higher education during the last two years are described. The reports list the major resolutions passed, laws enacted, and legislative appropriations. State legislation dealt with: establishment of the Washington library network; retirement systems; bookkeeping transactions; travel expenses; bond…

  16. Groundwater: A Community Action Guide.

    ERIC Educational Resources Information Center

    Boyd, Susan, Ed.; And Others

    Designed to be a guide for community action, this booklet examines issues and trends related to groundwater contamination. Basic concepts about groundwater and information about problems affecting it are covered under the categories of (1) what is groundwater? (2) availability and depletion; (3) quality and contamination; (4) public health…

  17. [Modes of action of IUDs].

    PubMed

    Janaud, A

    1982-05-01

    There are between 14-17 million women in the world, excluding China, who wear an IUD, or about 3-5% of all married women younger than 45. Studies on the mode of action of IUDs have been conducted mostly on laboratory animals; they show that ovulation and fecundation are not inhibited by the presence of an IUD. Contrary to what was generally believed, the latest studies have shown that the principle mode of action of the IUD is not its anti-implantation effect, but it depends on the adjustment inside the uterine cavity between the size of the uterine cavity itself, and the size and shape of the device. Endometrial modifications caused by IUDs include inflammatory phenomena, and inhibition of endometrial maturation. Moreover, copper IUDs act directly on spermatozoa and on endometrial steroid receptors. It is still not clear what role prostaglandins play in the mechanism of action of IUDs. Incidence of ectopic pregnancy is not greater in IUD wearers than in women who do not use contraception. Follicle stimulating hormone and luteinizing hormone levels also are comparable in IUD wearers and in nonwearers. IUD wearers have a shorter luteal phase, which entails an earlier menstrual bleeding due to the antifibrinolytic action of the IUD; progesterone levels are identical in users and in nonusers of IUDs.

  18. The Action Researcher as Chameleon.

    ERIC Educational Resources Information Center

    Hadfield, Mark; Bennett, Steve

    1995-01-01

    Describes a project that trained institutional policymakers in action research regarding problems in developing training policies about young people's needs, examining attempts to collaborate and dialog with stakeholders and discussing how project members became enmeshed in complex sets of relationships calling for construction of dialog in…

  19. Motor Action and Emotional Memory

    ERIC Educational Resources Information Center

    Casasanto, Daniel; Dijkstra, Katinka

    2010-01-01

    Can simple motor actions affect how efficiently people retrieve emotional memories, and influence what they choose to remember? In Experiment 1, participants were prompted to retell autobiographical memories with either positive or negative valence, while moving marbles either upward or downward. They retrieved memories faster when the direction…

  20. Antimicrobial peptide action on parasites.

    PubMed

    Torrent, Marc; Pulido, David; Rivas, Luis; Andreu, David

    2012-08-01

    Diseases caused by protozoan parasites can pose a severe thread to human health and are behind some serious neglected tropical diseases like malaria and leishmaniasis. Though several different drugs have been developed in order to eradicate these diseases, a successful candidate has not yet been discovered. Among the most active compounds tested, antimicrobial peptides (AMPs) are particularly appealing because of their wide spectrum of action. AMPs have been described to perturb protozoan homeostasis by disrupting the cellular membranes but also by interfering with key processes in the parasite metabolism. In this review we describe the diverse mechanisms of action of AMPs on protozoan targets and how they can be exploited to treat diseases. Moreover, we describe with detail the antimicrobial action of AMPs on two major parasitical infections: leishmaniasis and malaria. All the features reviewed here show that AMPs are promising drugs to target protozoan parasites and that further understanding of the mechanism of action of these compounds will lead to improved drugs that could be worth to test in a clinical phase.