Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall be...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall be...
Climate Action Planning Process | Climate Neutral Research Campuses | NREL
Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and
Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children
ERIC Educational Resources Information Center
Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert
2013-01-01
The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.320 Section 91.320... Consolidated Plan § 91.320 Action plan. The action plan must include the following: (a) Standard Form 424; (b... outcome measures for activities included in its action plan in accordance with guidance issued by HUD. For...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.220 Section 91.220... Consolidated Plan § 91.220 Action plan. The action plan must include the following: (a) Standard Form 424; (b... to be undertaken. The action plan must provide a description of the activities the jurisdiction will...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.220 Section 91.220... Consolidated Plan § 91.220 Action plan. The action plan must include the following: (a) Standard Form 424; (b... to be undertaken. The action plan must provide a description of the activities the jurisdiction will...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.320 Section 91.320... Consolidated Plan § 91.320 Action plan. The action plan must include the following: (a) Standard Form 424; (b... outcome measures for activities included in its action plan in accordance with guidance issued by HUD. For...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and activities...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and activities...
7 CFR 275.16 - Corrective action planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which: (1...
Developing a Global Green Freight Action Plan
This Climate and Clean Air Coalition (CCAC) presentation gives an overview of the Global Green Freight Action Plan to improve the energy efficiency and environmental performance of freight operations worldwide along with developing an action plan.
36 CFR 906.4 - Formulation of affirmative action plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Formulation of affirmative...
Workshop on the preparation of climate change action plans. Workshop summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-05-24
Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.
36 CFR 906.5 - Administration of affirmative action plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility. (b...
36 CFR 906.5 - Administration of affirmative action plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility. (b...
34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 2 2010-07-01 2010-07-01 false What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals with...
34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 2 2011-07-01 2010-07-01 true What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals with...
24 CFR 248.135 - Plans of action.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Plans of action. 248.135 Section... OF LOW INCOME HOUSING MORTGAGES Prepayments and Plans of Action Under the Low Income Housing Preservation and Resident Homeownership Act of 1990 § 248.135 Plans of action. (a) Submission. An owner seeking...
Statewide ITS development and deployment plan
DOT National Transportation Integrated Search
2002-10-01
This plan was developed to create a means to implement the ongoing, short-term and long-term activities identified in the Statewide ITS Action Plan. As part of the process for organizing the approximately seventy-five Action Plan activities, these we...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Benioff, R.; Ness, E.; Hirst, J.
Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date withmore » the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.« less
Transfusion service disaster planning.
Bundy, K L; Foss, M L; Stubbs, J R
2008-01-01
The Mayo Clinic, in Rochester, Minnesota, recently set forth a directive to develop a Mayo Emergency Incident Command System (MEICS) plan to respond to major disasters. The MEICS plan that was developed interfaces with national response plans to ensure effective communication and coordination between our institution and local, state, and federal agencies to establish a common language and communication structure. The MEICS plan addresses multiple aspects of dealing with resource needs during a crisis, including the need for blood and transfusion medicine services. The MEICS plan was developed to supplement our current local emergency preparedness procedures and provide a mechanism for responding to the escalating severity of an emergency to deal with situations of a magnitude that is outside the normal experience. A plan was developed to interface the existing Transfusion Medicine disaster plan standard operating procedures (SOP) with the institutional and Department of Laboratory Medicine (DLMP) MEICS plans. The first step in developing this interface was defining MEICS. Other major steps were defining the chain of command, developing a method for visually indicating who is "in charge," planning communication, defining the actions to be taken, assessing resource needs, developing flowcharts and updating SOPs, and developing a blood rationing team to deal with anticipated blood shortages. Several key features of the interface and updated disaster plan that were developed are calling trees for response personnel, plans for relocating leadership to alternative command centers, and action sheets to assist with resource assessment. The action sheets also provide documentation of key actions by response personnel.
75 FR 2466 - State Highway-Rail Grade Crossing Action Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-15
...-0032, Notice No. 4] RIN 2130-AC20 State Highway-Rail Grade Crossing Action Plans AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Notice of public hearing and... collisions, on average, over the past three years, to develop State highway-rail grade crossing action plans...
75 FR 36551 - State Highway-Rail Grade Crossing Action Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-28
...-0032; Notice No. 5] RIN 2130-AC20 State Highway-Rail Grade Crossing Action Plans AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Final rule. SUMMARY: This final... three years, to develop State highway-rail grade crossing action plans. The final rule addresses the...
Countywide Cooperative Library Service, Lincoln County, Oregon. An Action Plan.
ERIC Educational Resources Information Center
Dalton, Phyllis I.
This comprehensive action plan addresses eight areas important to the development of county-wide cooperative library service: the utilization of total library resources and services, accessibility of library service, organization, financing, special services for special needs, short range action plans, and long-range planning. Additional sections…
Action Planning in Typically and Atypically Developing Children (Unilateral Cerebral Palsy)
ERIC Educational Resources Information Center
Craje, Celine; Aarts, Pauline; Nijhuis-van der Sanden, Maria; Steenbergen, Bert
2010-01-01
In the present study, we investigated the development of action planning in children with unilateral Cerebral Palsy (CP, aged 3-6 years, n = 24) and an age matched control group. To investigate action planning, participants performed a sequential movement task. They had to grasp an object (a wooden play sword) and place the sword in a hole in a…
Yin, H Shonna; Gupta, Ruchi S; Tomopoulos, Suzy; Wolf, Michael S; Mendelsohn, Alan L; Antler, Lauren; Sanchez, Dayana C; Lau, Claudia Hillam; Dreyer, Benard P
2013-01-01
Recognition of the complexity of asthma management has led to the development of asthma treatment guidelines that include the recommendation that all pediatric asthma patients receive a written asthma action plan. We assessed the readability, suitability, and characteristics of asthma action plans, elements that contribute to the effectiveness of action plan use, particularly for those with limited literacy. This was a descriptive study of 30 asthma action plans (27 state Department of Health (DOH)-endorsed, 3 national action plans endorsed by 6 states). (1) readability (as assessed by Flesch Reading Ease, Flesch-Kincaid, Gunning Fog, Simple Measure of Gobbledygook, Forcast), (2) suitability (Suitability Assessment of Materials [SAM], adequate: ≥ 0.4; unsuitable: <0.4), (3) action plan characteristics (peak flow vs symptom-based, symptoms, recommended actions). Mean (SD) overall readability grade level was 7.2 (1.1) (range = 5.7-9.8); 70.0% were above a sixth-grade level. Mean (SD) suitability score was 0.74 (0.14). Overall, all action plans were found to be adequate, although 40.0% had an unsuitable score in at least 1 factor. The highest percent of unsuitable scores were found in the categories of layout/typography (30.0%), learning stimulation/motivation (26.7%), and graphics (13.3%). There were no statistically significant differences between the average grade level or SAM score of state DOH developed action plans and those from or adapted from national organizations. Plans varied with respect to terms used, symptoms included, and recommended actions. Specific improvements in asthma action plans could maximize patient and parent understanding of appropriate asthma management and could particularly benefit individuals with limited literacy skills.
Minnesota Guidestar Board of Directors' statewide ITS action plan
DOT National Transportation Integrated Search
2001-03-01
Following the completion of ITS Strategic Plan 2000, the Guidestar Board of Directors requested that a detailed plan be developed to articulate specific activities that should be undertaken to support the action items that were developed as part of I...
Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.
Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge
2015-12-01
Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.
29 CFR 1918.100 - Emergency action plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor... action plans. (a) Scope and application. This section requires all employers to develop and implement an...
ERIC Educational Resources Information Center
Connecticut State Dept. of Community Affairs, Hartford.
This report of the Connecticut Community Development Action Plan (CDAP) contains a brochure on how to plan and execute a CDAP, detailed guidelines for municipalities, the Community Development Act (Public Act 522) and related legislation (Public Acts 768 and 760), and provisions of 20 other public acts. Interpersonal communication, citizen…
76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-09
...On July 19, 2010, President Obama signed Executive Order 13547 establishing a National Policy for the Stewardship of the Ocean, our Coasts, and the Great Lakes (``National Ocean Policy''). The National Ocean Policy provides an implementation strategy, which describes nine priority objectives that seek to address some of the most pressing challenges facing the ocean, our coasts, and the Great Lakes. The National Ocean Council is responsible for developing strategic action plans for each of the nine priority objectives. As a first step, Federal interagency writing teams have developed content outlines for each draft strategic action plan. The NOC is seeking public review and comment of these content outlines. The purpose of the draft content outlines (outlines) is to provide the public with an initial view of potential actions that could be taken to further the national priority objectives. As such, they are an interim step toward development of the first full draft of each strategic action plan. In developing the outlines, the writing teams were informed by the comments received during an initial public scoping period that closed on April 29. Each outline presents in bulleted form potential actions to further the particular priority objective. It describes the reasons for taking the action, expected outcomes and milestones, gaps and needs in science and technology, and the timeframe for completing the action. The outlines also provide an overview of the priority objective, greater context for the strategic action plan in implementing the National Ocean Policy, and an overview of the preparation of the plan . Public comments received on the outlines will be collated and posted on the NOC Web site. The comments on the outlines will inform the preparation of full draft strategic action plans, which will be released for public review in the fall of 2011, allowing additional opportunity for the public to provide comments. Final strategic action plans are expected to be completed by early 2012.
40 CFR 280.66 - Corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Corrective action plan. 280.66 Section 280.66 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... additional information or to develop and submit a corrective action plan for responding to contaminated soils...
Guide to Rebuilding Governance in Stability Operations: A Role for the Military?
2009-06-01
departments to assess needs, develop a list of necessary parts and equipment, and prepare an action plan for restoration of services. With rapid...for drafting, reviewing, and voting on a new constitution was pursued. The Rwandan government’s action plan included: training and sensitization of...together to build collaborative relationships, share strategies for addressing obstacles, and develop joint action plans . Provide opportunities for CSOs to
78 FR 25760 - Proposed Information Collection; Urban Park and Recreation Recovery Program Grants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-02
...--renovate or redesign existing close-to- home recreation facilities. Innovation--specific activities that... existing programs. Planning--development of a Recovery Action Program plan. The information collection... recreation system goals. Citizen involvement in the development of the Action Plan is required and may...
The Development of Action Planning in a Joint Action Context
ERIC Educational Resources Information Center
Paulus, Markus
2016-01-01
The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus.…
Ring, Nicola; Jepson, Ruth; Hoskins, Gaylor; Wilson, Caroline; Pinnock, Hilary; Sheikh, Aziz; Wyke, Sally
2011-11-01
To understand better what helps and/or hinders asthma action plan use from the professionals and patients/carers perspective. Systematic review and qualitative synthesis (using meta-ethnography). Nineteen studies (20 papers) were included in an analysis of patients/carers' and professionals' views. Seven main influences on action plan implementation were identified including perceived un-helpfulness and irrelevance of the plans. Translation and synthesis of the original authors' interpretations suggested that action plan promotion and use was influenced by professional and patient/carers' asthma beliefs and attitudes and patient/carer experiences of managing asthma. Action plan use is hindered because professionals and patients/carers have different explanatory models of asthma, its management and their respective roles in the management process. Patients/carers, based on their experiential knowledge of their condition, perceive themselves as capable, effective in managing their asthma, but health professionals do not always share this view. Professionally provided medically focused action plans that do not 'fit' with and incorporate the patients'/carers' views of asthma, and their management strategies, will continue to be under-utilised. Professionals need to develop a more patient-centred, partnership-based, approach to the joint development and review of action plans, recognising the experiential asthma knowledge of patients/carers. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.
ORD Strategic Action Plan for Information Management / Information Technology 2011
ORD's Strategic Action Plan for IM/IT (2011) was collaboratively developed with input from ORD research and administrative personnel. It identifies actions necessary to support ORD's priority IM and IT needs.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-24
... OFFICE OF SCIENCE AND TECHNOLOGY POLICY National Ocean Council; Development of Strategic Action Plans for the National Policy for the Stewardship of the Ocean, Our Coasts, and the Great Lakes ACTION... the Great Lakes. The National Policy provides a comprehensive approach, based on science and...
Guo, Yuqi; Sims, Omar T
2017-02-17
Hepatitis C virus (HCV) kills 366,000 people worldwide and 17,000 people in the United States each year. In 2011, the U.S. Department of Health and Human Services (HHS) published a national viral hepatitis action plan to control and combat HCV in the United States. This article provides a brief update of HCV health policy developments that have emerged since publication of HHS's national viral hepatitis action plan and concludes with a discussion of the public health impact of these recent HCV health policy developments.
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...
Prairie Conservation in Canada: The Prairie Conservation Action Plan Experience
Dean Nernberg; David Ingstrup
2005-01-01
In Canada, grassland conservation has been mobilized and directed through the development of Prairie Conservation Action Plans and Action Plan Committees in the three prairie provinces of Alberta (45 partner agencies and organizations), Saskatchewan (26 partners), and Manitoba (26 partners). In Alberta, 43 percent of the native prairie remains; in Saskatchewan and...
21 CFR 120.10 - Corrective actions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Corrective actions. 120.10 Section 120.10 Food and... actions. Whenever a deviation from a critical limit occurs, a processor shall take corrective action by... develop written corrective action plans, which become part of their HACCP plans in accordance with § 120.8...
Action Plan for the Development of Civic Morality
ERIC Educational Resources Information Center
Chinese Education and Society, 2006
2006-01-01
This paper discusses the action plan for the development of civic morality. Here, the importance, substance, ideology and policy principles guiding the development of civic morality is elaborated. In order to strengthen the development of civic morality, it is a must to adapt to the requirements of the developing situation; seize good…
Odom, Laura; Christenbery, Tom
2016-11-01
Asthma burden affects mortality, morbidity, quality of life, and the economy. Written asthma action plans are standard of care according to national guidelines, but these plans are often not prescribed. The purpose of this project was to develop an asthma action plan application for smartphones. A development studio was consulted for support in developing a smartphone application to code the software for the asthma action plan and assist in the design process. During development of the application, a survey was conducted to assist in design of the application and functionality. All survey participants agreed that the application was easy to use, could be used without written instruction, and was designed for adolescents with asthma of any severity. Patients and providers mostly agreed that the app would help provide information about what to do in the event of an asthma exacerbation, and the application would be used frequently. There was consensus from both patients and providers that this application is not only functional but also helpful in the event of an asthma exacerbation. The project met the goal of designing a mobile phone application that would improve patient access to asthma action plans. ©2016 American Association of Nurse Practitioners.
Using Participatory Action Research to Develop an HIV and AIDS School Plan
ERIC Educational Resources Information Center
Ferreira, Ronél; Ebersöhn, Liesel; Botha, Karien
2013-01-01
In this article we report on the manner in which participatory action research (PAR) was utilised by teachers in developing a Human Immunodeficiency Virus (HIV) and Acquired Immunodeficiency Syndrome (AIDS) school plan, in collaboration with university researchers. The need for a structured HIV and Aids school plan emerged during the course of a…
40 CFR 141.802 - Coliform sampling plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Coliform sampling plan. 141.802... sampling plan. (a) Each air carrier under this subpart must develop a coliform sampling plan covering each... required actions, including repeat and follow-up sampling, corrective action, and notification of...
40 CFR 141.802 - Coliform sampling plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Coliform sampling plan. 141.802... sampling plan. (a) Each air carrier under this subpart must develop a coliform sampling plan covering each... required actions, including repeat and follow-up sampling, corrective action, and notification of...
Schober, Daniel J; Fawcett, Stephen B
2015-08-01
The DELTA PREP Project aims to reduce risk for intimate partner violence (IPV). It engaged leadership and staff from 19 statewide domestic violence coalitions in building capacity to prevent IPV before it occurs (rather than solely responding to IPV). This article describes the process and outcomes associated with action planning to create coalition organizational change related to preventing IPV. Coalition staff and leadership planned for organizational changes in six goal areas: leadership, structures and processes, staffing, resource development, partnership development, and member agency development. Action planning was conducted during 2-day, in-person sessions that involved (a) review and refinement of coalition vision and mission statements, (b) interpretation of coalition assessments (for prevention capacity), (c) identification of specific organizational changes to be sought, and (d) specification of action steps for each proposed organizational change to be sought. The results show overall increases in the amounts, and variations in the kinds, of organizational changes that were facilitated by coalitions. Challenges related to action planning and future directions for capacity building among statewide IPV prevention coalitions are discussed. © 2015 Society for Public Health Education.
Planning-in-Action: An Innovative Approach to Human Development. The Hunger Project.
ERIC Educational Resources Information Center
Community Development Journal, 1991
1991-01-01
The Hunger Project in India used a strategic planning-in-action approach that involved (1) reaching a common understanding; (2) creating a strategic intent; (3) choosing social indicators; (4) identifying strategic objectives; (5) empowering leadership; (6) identifying immediate action steps; and (7) sustaining the action. (SK)
Orange County intelligent vehicle/highway systems study : IVHS action plan
DOT National Transportation Integrated Search
1997-01-21
This report is a result of the efforts undertaken for Task 6 of the Orange County : Intelligent Vehicle-Highway Systems (IVHS) Study, the development of an Action Plan for : implementation of the Orange County IVHS Master Plan.
Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April
2016-01-01
Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations. PMID:27606968
A national action plan for workforce development in behavioral health.
Hoge, Michael A; Morris, John A; Stuart, Gail W; Huey, Leighton Y; Bergeson, Sue; Flaherty, Michael T; Morgan, Oscar; Peterson, Janice; Daniels, Allen S; Paris, Manuel; Madenwald, Kappy
2009-07-01
Across all sectors of the behavioral health field there has been growing concern about a workforce crisis. Difficulties encompass the recruitment and retention of staff and the delivery of accessible and effective training in both initial, preservice training and continuing education settings. Concern about the crisis led to a multiphased, cross-sector collaboration known as the Annapolis Coalition on the Behavioral Health Workforce. With support from the Substance Abuse and Mental Health Services Administration, this public-private partnership crafted An Action Plan for Behavioral Health Workforce Development. Created with input from a dozen expert panels, the action plan outlines seven core strategic goals that are relevant to all sectors of the behavioral health field: expand the role of consumers and their families in the workforce, expand the role of communities in promoting behavioral health and wellness, use systematic recruitment and retention strategies, improve training and education, foster leadership development, enhance infrastructure to support workforce development, and implement a national research and evaluation agenda. Detailed implementation tables identify the action steps for diverse groups and organizations to take in order to achieve these goals. The action plan serves as a call to action and is being used to guide workforce initiatives across the nation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The LEDS Global Partnership (LEDS GP) strives to advance climate-resilient, low-emission development through catalyzing collaboration, information exchange, and action on the ground. The Government of Kenya is a key LEDS GP member and offers an inspiring example of how LEDS GP is having an impact globally. The 2012 LEDS Collaboration in Action workshop in London provided an interactive space for members to share experiences on cross-ministerial LEDS leadership and to learn about concrete development impacts of LEDS around the world. Inspired by these stories, the Kenya's Ministry of State for Planning, National Development and Vision 2030 (MPND) began to collaboratemore » closely with the Ministry of Environment and Mineral Resources to create strong links between climate change action and development in the country, culminating in the integration of Kenya's National Climate Change Action Plan and the country's Medium Term Development Plan.« less
Crisis action planning and replanning using SIPE-2
NASA Technical Reports Server (NTRS)
Skidmore, Jennifer D.
1993-01-01
Rome Laboratory and DARPA are jointly sponsoring an initiative to develop the next generation of AI planning and scheduling technology focused on military operations planning, especially for crisis situations. SRI International has demonstrated their knowledge-based planning technology in this domain with a system called SOCAP, System for Operations Crisis Action Planning. SOCAP's underlying power comes from SIPE-2, a hierarchical, domain-independent, nonlinear AI planner also developed at SRI. This paper discusses the features of SIPE-2 that made it an ideal choice for military operations planning and which contributed greatly to SOCAP's success.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Strategy To Implement Affirmative Action Personnel Plan B Exhibit B to Part 906 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Pt. 906, Exh. B Exhibit B to Part 906—Guidelines for Establishing Strategy To Implement Affirmative Action...
Baur, Cynthia; Harris, Linda; Squire, Elizabeth
2017-01-01
This chapter presents the U.S. National Action Plan to Improve Health Literacy and its unique contribution to public health and health care in the U.S. The chapter details what the National Action Plan is, how it evolved, and how it has influenced priorities for health literacy improvement work. Examples of how the National Action Plan fills policy and research gaps in health care and public health are included. The first part of the chapter lays the foundation for the development of the National Action Plan, and the second part discusses how it can stimulate positive organizational change to help create health literate organizations and move the nation towards a health literate society.
ERIC Educational Resources Information Center
Mieso, Rob Roba
2010-01-01
This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…
42 CFR 433.138 - Identifying liable third parties.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Integration with the State mechanized claims processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval... processing and information retrieval system. (2) The action plan must describe the actions and methodologies...
42 CFR 433.138 - Identifying liable third parties.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Integration with the State mechanized claims processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval... processing and information retrieval system. (2) The action plan must describe the actions and methodologies...
Patient safety in the care of mentally ill people in Switzerland: Action plan 2016
Richard, Aline; Mascherek, Anna C; Schwappach, David L B
2017-01-01
Background: Patient safety in mental healthcare has not attracted great attention yet, although the burden and the prevalence of mental diseases are high. The risk of errors with potential for harm of patients, such as aggression against self and others or non-drug treatment errors is particularly high in this vulnerable group. Aim: To develop priority topics and strategies for action to foster patient safety in mental healthcare. Method: The Swiss patient safety foundation together with experts conducted round table discussions and a Delphi questionnaire to define topics along the treatment pathway, and to prioritise these topics. Finally, fields of action were developed. Results: An action plan was developed including the definition and prioritization of 9 topics where errors may occur. A global rating task revealed errors concerning diagnostics and structural errors as most important. This led to the development of 4 fields of action (awareness raising, research, implementation, and education and training) including practice-oriented potential starting points to enhance patient safety. Conclusions: The action plan highlights issues of high concern for patient safety in mental healthcare. It serves as a starting point for the development of strategies for action as well as of concrete activities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... such sales, and other safety related measures, and that is substantially similar to the plans described... intended exclusively for research and development purposes unless the vehicle is offered for sale. (b) ATV action plan means a written plan or letter of undertaking that describes actions the manufacturer or...
Climate Change Action Plan The Rhode Island Executive Climate Change Coordinating Council (Council ) and the State Chief Resiliency Officer will develop a statewide Action Plan to Stand Up to Climate
Федосюк, Роман Н
In recent years, the problem of patient safety has become top-priority in further improvement of national healthcare systems in all developed countries. To develop a modular structure and a component composition of the strategic patient safety action plan for the anesthesiology and intensive care service of Ukraine as a part of the National Action Plan. Major domestic priorities, substantiated and made public by the author in previous works, are taken as the basis for the modular structuring of the action plan. Existing foreign prototypes, evaluated for the patient safety effectiveness and the potential for the adaptation to domestic conditions, as well as author's own innovations are offered for a component filling-up of each module. Eight modules - infectious safety, surgical safety, pharmaceutical safety, infrastructural safety, incident monitoring and reporting, education and training, research and awards - have been proposed. Individual components for each of the modules are selected from a variety of foreign prototypes and author's own developments. Inter-modular stratification of the components into short-term perspective tools and long-term perspective tools, depending on the amount of resources needed for their implementation, is carried out. The strategic patient safety action plan for the anesthesiology and intensive care service of Ukraine is the embodiment, within a particular specialty, of the wider National Action Plan developed by the First National Congress on Patient Safety (Kiev, 2012) on the initiative of the Council of Europe and aimed at the fulfillment of international obligations of Ukraine in the healthcare sector. Its implementation will contribute to enhancing the safety of anesthesia and intensive care services in Ukraine and further development of the specialty.
Talent Management: Emphasis on Action
ERIC Educational Resources Information Center
Butterfield, Barbara
2008-01-01
Recent discussions among HR practitioners in higher education have focused on talent management; specifically, the concept of developing a college or university talent management approach balanced between planning and action. Talent management as a planning tool looks very similar to workforce planning, but where HR will experience a real…
29 CFR 1918.100 - Emergency action plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or...
29 CFR 1918.100 - Emergency action plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or...
29 CFR 1918.100 - Emergency action plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or...
29 CFR 1918.100 - Emergency action plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or...
Community Action for Recreation Development.
ERIC Educational Resources Information Center
Christiansen, Rudolph A.; And Others
Examples of projects, notably those using watersheds, that local community action groups can promote in planning and developing needed recreational facilities are discussed in this study report. Objectives of the report are to create an awareness of group action in obtaining recreational development, to emphasize that community action is important…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-16
... the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice of Extension of... requirements for Consolidated Planning for Community Planning and Development (CPD) programs described below... INFORMATION CONTACT: Salvatore Sclafani, Office of Community Planning & Development, telephone (202) 402-4364...
The national response for preventing healthcare-associated infections: infrastructure development.
Mendel, Peter; Siegel, Sari; Leuschner, Kristin J; Gall, Elizabeth M; Weinberg, Daniel A; Kahn, Katherine L
2014-02-01
In 2009, the US Department of Health and Human Services (HHS) launched the Action Plan to Prevent Healthcare-associated Infections (HAIs). The Action Plan adopted national targets for reduction of specific infections, making HHS accountable for change across the healthcare system over which federal agencies have limited control. This article examines the unique infrastructure developed through the Action Plan to support adoption of HAI prevention practices. Interviews of federal (n=32) and other stakeholders (n=38), reviews of agency documents and journal articles (n=260), and observations of interagency meetings (n=17) and multistakeholder conferences (n=17) over a 3-year evaluation period. We extract key progress and challenges in the development of national HAI prevention infrastructure--1 of the 4 system functions in our evaluation framework encompassing regulation, payment systems, safety culture, and dissemination and technical assistance. We then identify system properties--for example, coordination and alignment, accountability and incentives, etc.--that enabled or hindered progress within each key development. The Action Plan has developed a model of interagency coordination (including a dedicated "home" and culture of cooperation) at the federal level and infrastructure for stimulating change through the wider healthcare system (including transparency and financial incentives, support of state and regional HAI prevention capacity, changes in safety culture, and mechanisms for stakeholder engagement). Significant challenges to infrastructure development included many related to the same areas of progress. The Action Plan has built a foundation of infrastructure to expand prevention of HAIs and presents useful lessons for other large-scale improvement initiatives.
Montana Statewide Outdoor Recreation Plan: Action Program.
ERIC Educational Resources Information Center
Montana State Fish and Game Commission, Helena.
The current revision of Montana's Statewide Outdoor Recreation Plan allows for utilizing the state's outdoor recreational resources to the best advantage of present and future generations. In developing the action program, consideration has been given to preservation, protection, and enhancement of the natural environment. The plan has also been…
Professional Development of Officers Study. Volume 4, Development Periods
1985-02-21
that cadets and making techniques and the t.se of a common op- candidates are expected to receive as broad- erational language to direct actions and...based, in part, on the branch production 2 Glossary mission of the institution (reinforce through 3 Action Plan branch-specific position coding). 4...the next four years (see Action Plan cept for its scholarship students (about three per- at Appendix 3 for details). cent of ROTC cadets), imposes
SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain
NASA Technical Reports Server (NTRS)
Desimone, Roberto
1992-01-01
This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'
ERIC Educational Resources Information Center
Longmore, Myron J.
A retention plan was developed to quantify and qualify the attrition problem and to establish action plans to improve retention for a regional university serving many nontraditional students. Cameron University, a state institution in Oklahoma, provides both associate and bachelor degree programs. The attrition problems were difficult to identify…
Developing a vision and strategic action plan for future community-based residency training.
Skelton, Jann B; Owen, James A
2016-01-01
The Community Pharmacy Residency Program (CPRP) Planning Committee convened to develop a vision and a strategic action plan for the advancement of community pharmacy residency training. Aligned with the profession's efforts to achieve provider status and expand access to care, the Future Vision and Action Plan for Community-based Residency Training will provide guidance, direction, and a strategic action plan for community-based residency training to ensure that the future needs of community-based pharmacist practitioners are met. National thought leaders, selected because of their leadership in pharmacy practice, academia, and residency training, served on the planning committee. The committee conducted a series of conference calls and an in-person strategic planning meeting held on January 13-14, 2015. Outcomes from the discussions were supplemented with related information from the literature. Results of a survey of CPRP directors and preceptors also informed the planning process. The vision and strategic action plan for community-based residency training is intended to advance training to meet the emerging needs of patients in communities that are served by the pharmacy profession. The group anticipated the advanced skills required of pharmacists serving as community-based pharmacist practitioners and the likely education, training and competencies required by future residency graduates in order to deliver these services. The vision reflects a transformation of community residency training, from CPRPs to community-based residency training, and embodies the concept that residency training should be primarily focused on training the individual pharmacist practitioner based on the needs of patients served within the community, and not on the physical location where pharmacy services are provided. The development of a vision statement, core values statements, and strategic action plan will provide support, guidance, and direction to the profession of pharmacy to continue the advancement and expansion of community-based residency training. Published by Elsevier Inc.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Property PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Pt. 906, Exh... Personnel Plan The following are suggested as the types of activities to be considered in the development of... unutilized skills and knowledge as well as opportunities for reassignment. (7) Utilization of merit promotion...
Wilderness and backcountry site restoration guide
Lisa Therrell; David Cole; Victor Claassen; Chris Ryan; Mary Ann Davies
2006-01-01
This comprehensive guide focuses on restoration of small-scale impact caused by human actions in wilderness and backcountry areas. The guide's goals are to: 1) Help practitioners develop plans that thoroughly address the question of whether site restoration is the best management action and, if so, develop a site-specific restoration plan that incorporates...
Putting Action Back into Action Planning: Experiences of Career Clients
ERIC Educational Resources Information Center
Borgen, William A.; Maglio, Asa-Sophia T.
2007-01-01
This study used the critical incident technique to investigate what helped and hindered unemployed and career-changing people in implementing the action plans they developed while participating in career or employment counseling. Information from interviews with 23 women and 16 men generated 9 categories of helping incidents and 9 categories of…
Strategic planning: getting from here to there.
Kaleba, Richard
2006-11-01
Hospitals should develop a strategic plan that defines specific actions in a realistic time frame. Hospitals can follow a five-phase process to develop a strategic plan. The strategic planning process requires a project leader and medical staff buy-in.
The Cool & Connected planning assistance program helps communities develop strategies and an action plan for using broadband to promote environmentally and economically sustainable community development.
[Global and national strategies against antibiotic resistance].
Abu Sin, Muna; Nahrgang, Saskia; Ziegelmann, Antina; Clarici, Alexandra; Matz, Sibylle; Tenhagen, Bernd-Alois; Eckmanns, Tim
2018-05-01
Antimicrobial resistance (AMR) is increasingly perceived as a global health problem. To tackle AMR effectively, a multisectoral one health approach is needed. We present some of the initiatives and activities at the national and global level that target the AMR challenge. The Global Action Plan on AMR, which has been developed by the World Health Organization (WHO), in close collaboration with the Food and Agriculture Organization of the United Nations (FAO) and the World Organisation for Animal Health (OIE) is considered a blueprint to combat AMR. Member states endorsed the action plan during the World Health Assembly 2015 and committed themselves to develop national action plans on AMR. The German Antibiotic Resistance Strategy (DART 2020) is based on the main objectives of the global action plan and was revised and published in 2015. Several examples of the implementation of DART 2020 are outlined here.
2007-08-01
example, the topic of massively multiplayer online role playing games ( MMORPGs ). (A related class of first person multiplayer shooters includes...key and measurable indicators that require immediate action. They develop plans of action for these trigger points to avoid premature commitment of...recognize that the cause of the incident may be an accident or act of nature, or it may be either criminal or terrorist activity. They avoid the
Disentangling self-management goal setting and action planning: A scoping review
Daniëls, Ramon; van Bokhoven, Marloes Amantia; van der Weijden, Trudy; Beurskens, Anna
2017-01-01
Introduction The ongoing rise in the numbers of chronically ill people necessitates efforts for effective self-management. Goal setting and action planning are frequently used, as they are thought to support patients in changing their behavior. However, it remains unclear how goal setting and action planning in the context of self-management are defined in the scientific literature. This study aimed to achieve a better understanding of the various definitions used. Methods A scoping review was conducted, searching PubMed, Cinahl, PsychINFO and Cochrane. Inclusion and exclusion criteria were formulated to ensure the focus on goal setting/action planning and self-management. The literature was updated to December 2015; data selection and charting was done by two reviewers. A qualitative content analysis approach was used. Results Out of 9115 retrieved articles, 58 met the inclusion criteria. We created an overview of goal setting phases that were applied (preparation, formulation of goals, formulation of action plan, coping planning and follow-up). Although the phases we found are in accordance with commonly known frameworks for goal setting, it was striking that the majority of studies (n = 39, 67%) did not include all phases. We also prepared an overview of components and strategies for each goal setting phase. Interestingly, few strategies were found for the communication between patients and professionals about goals/action plans. Most studies (n = 35, 60%) focused goal setting on one single disease and on a predefined lifestyle behavior; nearly half of the articles (n = 27, 47%) reported a theoretical framework. Discussion The results might provide practical support for developers of interventions. Moreover, our results might encourage professionals to become more aware of the phases of the goal setting process and of strategies emphasizing on patient reflection. However, more research might be useful to examine strategies to facilitate communication about goals/action plans. It might also be worthwhile to develop and evaluate goal setting/action planning strategies for people with different and multiple chronic conditions. PMID:29176800
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-31
... Secretary for Community Planning and Development, HUD. ACTION: Notice of revised information collection for... Community Planning and Development (CPD) programs described below will be submitted to the Office of... Community Planning and Development, telephone (202) 402-3669 (this is not a toll- free number...
The CNCC Five-Year Plan of Action, 1989-90 to 1993-94.
ERIC Educational Resources Information Center
Colorado Northwestern Community Coll., Rangely.
This six-part report describes the recently developed 5-year strategic plan of action for Colorado Northwestern Community College (CNCC), reviewing the mission and goals of the college, stating 21 organizational objectives in order of priority, and detailing implementation activities for each of the 5 years of the plan. Part I provides a brief…
Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childs, Allen
This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into amore » 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.« less
National Action Plan on Superconductivity Research and Development
NASA Astrophysics Data System (ADS)
1989-12-01
The Superconductivity Action Plan pursuant to the Superconductivity and Competitiveness Act of 1988 is presented. The plan draws upon contributions from leaders in the technical community of the Federal Government responsible for research and development in superconductivity programs, as well as from the report of the Committee to Advise the President on Superconductivity. Input from leaders in the private sector was obtained during the formulation and review of the plan. Some contents: Coordination of the plan; Technical areas (high temperature superconductivity materials in general, high temperature superconductivity films for sensors and electronics, magnets, large area high temperature superconductivity films, bulk conductors); and Policy areas.
U.S. Draft Domestic Action Plan for Lake Erie
In 2016, in response to the 2012 Great Lakes Water Quality Agreement commitments, Canada and the U.S. adopted phosphorus reduction targets for Lake Erie. Each country is developing domestic action plans which outline strategies for meeting the new targets.
Indoor Air Quality in Schools: Understanding the Problem and Finding the Solution.
ERIC Educational Resources Information Center
Bacci, Geoff
2002-01-01
Describes issues and solutions involving indoor air quality in school. Includes indoor air quality action plans, the role of the environmental consultant, and resources available to help school districts develop an indoor air quality action plan. (PKP)
2009-02-01
the push for a NATO Membership Action Plan. The policy development needs to include a review of policy conducted together with the other countries in...the region and must be developed with an understanding of how Russia impacts Ukraine and the region. 15. SUBJECT TERMS Georgia, Crimea, Russia 16...integration, improved economic ties and a shift away from the push for a NATO Membership Action Plan. The policy development needs to include a review
Protective Action Guides (PAGs)
The Protective Action Guide (PAG) manual contains radiation dose guidelines that would trigger public safety measures. EPA developed Protective Action Guides to help responders plan for radiation emergencies.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-12
... Information Collection: Comment Request; Technical Assistance for Community Planning and Development Programs AGENCY: Office of the Assistant Secretary for Community Planning And Development, HUD. ACTION: Notice... Community Planning and Development, Department of Housing Urban and Development, 451 7th Street, SW., Room...
Vachon, Brigitte; Désorcy, Bruno; Gaboury, Isabelle; Camirand, Michel; Rodrigue, Jean; Quesnel, Louise; Guimond, Claude; Labelle, Martin; Huynh, Ai-Thuy; Grimshaw, Jeremy
2015-09-18
Improving primary care for chronic disease management requires a coherent, integrated approach to quality improvement. Evidence in the continuing professional development (CPD) field suggests the importance of using strategies such as feedback delivery, reflective practice and action planning to facilitate recognition of gaps and service improvement needs. Our study explored the outcomes of a CPD intervention, named the COMPAS Project, which consists of a three-hour workshop composed of three main activities: feedback, critical reflection and action planning. The feedback intervention is delivered face-to-face and presents performance indicators extracted from clinical-administrative databases. This aim of this study was to assess the short term outcomes of this intervention to engage primary care professional in continuous quality improvement (QI). In order to develop an understanding of our intervention and of its short term outcomes, a program evaluation approach was used. Ten COMPAS workshops on diabetes management were directly observed and qualitative data was collected to assess the intervention short term outcomes. Data from both sources were combined to describe the characteristics of action plans developed by professionals. Two independent coders analysed the content of these plans to assess if they promoted engagement in QI and interprofessional collaboration. During the ten workshops held, 26 interprofessional work teams were formed. Twenty-two of them developed a QI project they could implement themselves and that targeted aspects of their own practice they perceived in need of change. Most frequently prioritized strategies for change were improvement of systematic clientele follow-up, medication compliance, care pathway and support to improve adoption of healthier life habits. Twenty-one out of 22 action plans were found to target some level of improvement of interprofessional collaboration in primary care. Our study results demonstrate that the COMPAS intervention enabled professionals to target priorities for practice improvements and to develop action plans that promote interprofessional collaboration. The COMPAS intervention aims to increase capability for continuous QI, readiness to implement process of care changes and team shared goals but available resources, climate and culture for change and leadership, are also important required conditions to successfully implement these practice changes. We think that the proposed approach can be very useful to support and engage primary care professionals in the planning stage of quality improvement projects since it combines key successful ingredients: feedback, reflection and planning of action.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-15
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The ``Criteria for Developing Refuge Water Management Plans'' (Refuge...
DOT National Transportation Integrated Search
2009-03-01
By implementing the recommended actions of the Task Force, New Hampshire will achieve substantial emission reductions, beginning immediately, using cost-effective, available : technology. The greatest reductions would come from improvements in the bu...
Licskai, Christopher; Sands, Todd W; Ferrone, Madonna
2013-01-01
Collaborative self-management is a core recommendation of national asthma guidelines; the written action plan is the knowledge tool that supports this objective. Mobile health technologies have the potential to enhance the effectiveness of the action plan as a knowledge translation tool. To design, develop and pilot a mobile health system to support asthma self-management. The present study was a prospective, single-centre, nonrandomized, pilot preintervention-postintervention analysis. System design and development were guided by an expert steering committee. The network included an agnostic web browser-based asthma action plan smartphone application (SPA). Subjects securely transmitted symptoms and peak flow data daily, and received automated control assessment, treatment advice and environmental alerts. Twenty-two adult subjects (mean age 47 years, 82% women) completed the study. Biophysical data were received on 84% of subject days (subject day = 1 subject × 1 day). Subjects viewed their action plan current zone of control on 54% and current air quality on 61% of subject days, 86% followed self-management advice and 50% acted to reduce exposure risks. A large majority affirmed ease of use, clarity and timeliness, and 95% desired SPA use after the study. At baseline, 91% had at least one symptom criterion for uncontrolled asthma and 64% had ≥2, compared with 45% (P=0.006) and 27% (P=0.022) at study close. Mean Asthma Quality of Life Questionnaire score improved from 4.3 to 4.8 (P=0.047). A dynamic, real-time, interactive, mobile health system with an integrated asthma action plan SPA can support knowledge translation at the patient and provider levels.
ERIC Educational Resources Information Center
Young, Jennifer
2001-01-01
Explores potential for developing education for sustainability (EfS) through biodiversity planning in the UK based on a survey conducted in April 1999. Concludes that biodiversity practitioners have the tools to deliver EfS through implementation of local biodiversity action plans (LBAPs), the concept allowing close links to Local Agenda 21,…
Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.
2015-01-01
In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381
Zhao, Jialiang
2014-03-01
Action plan for the prevention of avoidable blindness and visual impairment for 2014-2019 endorsed by 66(th) World Health Assembly is an important document for promoting the global prevention of blindness. This action plan summarized the experiences and lessons in the global prevention of avoidable blindness and visual impairment from 2009 to 2013, raised the global goal for the prevention of blindness-the reduction in prevalence of avoidable visual impairment by 25% by 2019 from the baseline of 2010, set up the monitoring indicators for realizing the global goal. This document can be served as a roadmap to consolidate joint efforts aimed at working towards universal eye health in the world. This action plan must give a deep and important impact on the prevention of blindness in China.We should implement the action plan for the prevention of avoidable blindness and visual impairment for 2014-2019 to push forward sustaining development of the prevention of blindness in China.
77 FR 31974 - Order of Succession for the Office of Community Planning and Development
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-30
... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5642-D-02] Order of Succession for the Office of Community Planning and Development AGENCY: Office of the Secretary, HUD. ACTION: Notice of Order of Succession for the Office of Community Planning and Development. SUMMARY: In this notice, the...
76 FR 64364 - Order of Succession for the Office of Community Planning and Development
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-18
... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5556-D-02] Order of Succession for the Office of Community Planning and Development AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice of Order of Succession. SUMMARY: In this notice, the...
A Plan for Action by the National 4-H Urban Program Development Committee.
ERIC Educational Resources Information Center
National Four-H Club Foundation, Washington, DC.
The National 4-H Urban Program Development Committee's Plan for Action outlines some of the primary concerns of the urban 4-H program. It discusses the need for 4-H in urban areas and the particular relevance of sound program design and delivery in helping urban youth, especially those from low-income families, to find ways to improve their…
Using a Theory of Action to Develop Performance Indicators to Measure Progress toward a SIMR
ERIC Educational Resources Information Center
Schiller, Ellen; Hayes, Susan; Nagle, Katherine
2015-01-01
This white paper offers an approach for using a theory of action as an outline to develop the SSIP [State Systemic Improvement Plan] Phase II evaluation questions and plan that will guide the SSIP work in Phase III and beyond. Key areas of focus include generating evaluation questions at each level of outcomes, identifying essential steps and…
Code of Federal Regulations, 2011 CFR
2011-04-01
... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT... government and State actions which have been taken in accordance with the strategic plan. In addition to...
Dean, Elizabeth; de Andrade, Armele Dornelas; O'Donoghue, Grainne; Skinner, Margot; Umereh, Gloria; Beenen, Paul; Cleaver, Shaun; Afzalzada, DelAfroze; Delaune, Mary Fran; Footer, Cheryl; Gannotti, Mary; Gappmaier, Ed; Figl-Hertlein, Astrid; Henderson, Bobbie; Hudson, Megan K; Spiteri, Karl; King, Judy; Klug, Jerry L; Laakso, E-Liisa; LaPier, Tanya; Lomi, Constantina; Maart, Soraya; Matereke, Noel; Meyer, Erna Rosenlund; M'kumbuzi, Vyvienne R P; Mostert-Wentzel, Karien; Myezwa, Hellen; Olsén, Monika Fagevik; Peterson, Cathy; Pétursdóttir, Unnur; Robinson, Jan; Sangroula, Kanchan; Stensdotter, Ann-Katrin; Tan, Bee Yee; Tschoepe, Barbara A; Bruno, Selma; Mathur, Sunita; Wong, Wai Pong
2014-05-01
Based on indicators that emerged from The First Physical Therapy Summit on Global Health (2007), the Second Summit (2011) identified themes to inform a global physical therapy action plan to integrate health promotion into practice across the World Confederation for Physical Therapy (WCPT) regions. Working questions were: (1) how well is health promotion implemented within physical therapy practice; and (2) how might this be improved across five target audiences (i.e. physical therapist practitioners, educators, researchers, professional body representatives, and government liaisons/consultants). In structured facilitated sessions, Summit representatives (n = 32) discussed: (1) within WCPT regions, what is working and the challenges; and (2) across WCPT regions, what are potential directions using World Café(TM) methodology. Commonalities outweighed differences with respect to strategies to advance health-focused physical therapy as a clinical competency across regions and within target audiences. Participants agreed that health-focused practice is a professional priority, and a strategic action plan was needed to develop it as a clinical competency. The action plan and recommendations largely paralleled the principles and objectives of the World Health Organization's non-communicable diseases action plan. A third Summit planned for 2015 will provide a mechanism for follow-up to evaluate progress in integrating health-focused physical therapy within the profession.
75 FR 8645 - Public Meetings on the Development of the Forest Service Land Management Planning Rule
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-25
... DEPARTMENT OF AGRICULTURE Forest Service Public Meetings on the Development of the Forest Service Land Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meetings. SUMMARY: The USDA Forest Service is committed to developing a new Forest Service Land Management Planning Rule...
Underwood, J. Michael; Lakhani, Naheed; Rohan, Elizabeth; Moore, Angela; Stewart, Sherri L.
2015-01-01
Introduction Centers for Disease Control and Prevention’s (CDC) National Comprehensive Cancer Control Program (NCCCP) funds states, the District of Columbia, tribal organizations, territories, and jurisdictions across the USA develop and implement jurisdiction-specific comprehensive cancer control (CCC) plans. The objective of this study was to analyze NCCCP action plan data for incorporation and appropriateness of cancer survivorship-specific goals and objectives. Methods In August 2013, NCCCP action plans maintained within CDC’s Chronic Disease Management Information System (CDMIS) from years 2010 to 2013 were reviewed to assess the inclusion of cancer survivorship objectives. We used the CDMIS search engine to identify “survivorship” within each plan and calculated the proportion of programs that incorporate cancer survivorship-related content during the study period and in each individual year. Cancer survivorship objectives were then categorized by compatibility with nationally accepted, recommended strategies from the report A National Action Plan for Cancer Survivorship: Advancing Public Health Strategies (NAP). Results From 2010 to 2013, 94 % (n=65) of NCCCP action plans contained survivorship content in at least 1 year during the time period and 38 % (n=26) of all NCCCP action plans addressed cancer survivorship every year during the study period. Nearly 64 % (n=44) of NCCCP action plans included cancer survivorship objectives recommended in NAP. Conclusion Nearly all NCCCP action plans addressed cancer survivorship from 2010 to 2013, and most programs implemented recommended cancer survivorship efforts during the time period. Implications for Cancer Survivors NCCCP grantees can improve cancer survivorship support by incorporating recommended efforts within each year of their plans. PMID:25732543
10 CFR 50.47 - Emergency plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... clear instruction to the populace within the plume exposure pathway Emergency Planning Zone have been... protective actions has been developed for the plume exposure pathway EPZ for emergency workers and the public... and in place, and protective actions for the ingestion exposure pathway EPZ appropriate to the locale...
Watershed planning, implementation and assessment: the May River Watershed Action Plan case study
Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie
2016-01-01
Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...
The Austrian radon activities on the way to the national radon action plan.
Gruber, V; Ringer, W; Wurm, G; Haider, W
2014-07-01
Based on the new Euratom Basic Safety Standards (BSS), all EU member states will be obliged to design a strategy to address long-term risks from radon exposure, which is laid down in the 'national radon action plan'. In Austria, the National Radon Centre is responsible for the development of the action plan. This paper presents the current and planned radon protection activities on the way to establish the radon action plan--like the national radon database, the definition of radon risk areas by improving the existing radon map, as well as strategies and activities to increase the radon awareness of the public and decision-makers and to involve the building sector. The impact of and the need for actions caused by the BSS requirements on the Austrian radon legislation, strategy and programme are discussed. © The Author 2014. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
NASA Astrophysics Data System (ADS)
Papanikolaou, Dimitrios; Arvanitakis, Spyridon; Papanikolaou, , Ioannis; Lozios, Stylianos; Diakakis, Michalis; Deligiannakis, Georgios; Dimitropoulou, Margarita; Georgiou, Konstantinos
2013-04-01
Wildfires are a major hazard in Greece suffering on average 1,509 wildfires and 36,151 burned hectares of forestlands every year. Since 1998 the Greek Fire Service is responsible for wildfires suppression and response, while prevention and mitigation yearly directives are also being released by the General Secretariat of Civil Protection. The 3013/2002 Act introduced a major transfer of responsibilities from the national to local municipal and regional authorities, which are accompanied by supplementary financial support. Significant new features were established such as the operation of local coordination councils, the foundation of municipality civil protection offices, the establishment of the annually prevention planning for forest fires and the development of local action plans. The University of Athens has developed a Local Action Plan template for municipality administrative levels, integrating scientific techniques and technologies to public government management. The Local Action Plan for Forest Fire Prevention is the main handbook and primary tool of every municipality for reducing the risk of wildfires. Fire prevention and risk analysis are the principal aims of this Plan, which also emphasizes on the important role of the volunteer organizations on forest fire prevention. The 7 chapters of the Action Plan include the legal framework, the risk analysis parameters, the risk analysis using GIS, the prevention planning, the manpower and available equipment of services involved, along with operational planning and evaluation of the previous year's forest fire prevention actions. Multiple information layers, such as vegetation types, road network, power lines and landfills are combined in GIS environment and transformed into qualitative multiparameter as well as quantitative combinational fire hazard maps. These maps are essential in wildfire risk analysis as they display the areas that need the highest attention during the fire season. Moreover, the separate steps of operational planning and the reviewing of precaution, addressing and rehabilitation measures are analyzed. This action plan, risk analysis and maps are of decisive importance not only for prevention and operational planning purposes, but can also prove useful during the crisis and the rehabilitation processes as well. Additionally, we conducted a large questionnaire survey among the municipalities of Greece to assess the existing situation regarding forest fire prevention. Therefore, a network connecting civil protection departments of municipalities was developed, based on an Internet platform, which acted also as a communication tool. Overall, we had feedback either online or offline from 125 municipalities across the country (representing more than one/third of the total municipalities of Greece). 23% of the municipalities have not compiled an action plan yet despite the fact that the 3013/2002 Act of the Greek National Law requires one. Moreover, existing action plans are predominantly catalogues and tables of information regarding authorised personnel and equipment. They lack important information, present no spatial data and display no prevention measures. Indeed, 85% of the municipalities that have action plans do not use risk maps and spatial data, which are of decisive importance for compiling the plans. 74% of the municipalities do not keep a record of forest fires. The jurisdiction area has been modified after the new administrative plan of Kallikratis in 2010 in 74% of the municipalities, however, local action plans were not adapted accordingly in 61% of these. The daily Fire Risk Map of the General Secretariat of Civil Protection has a key role, since 77% of the municipalities take additional measures in case of increased fire risk. According to the civil protection officials, existing action plans suffer from several major problems which emerge due to the fact: that there is no assessment on the fire hazard 67%, there is lack of personnel training 65%, new technologies are not incorporated or used 57% and there is a lack of a template for compiling an action plan 53%. The partnership between the University of Athens with the support of the private sector and the Union of Municipalities of Attica was held under the LIFE+ project "Local Authorities Alliance for Forest Fire Prevention - LIFE08/ENV/GR/000553 " which is implemented with the contribution of the LIFE financial instrument of the European Community.
King, E A; Murphy, E; Rice, H J
2011-03-01
The first phase of noise mapping and action planning in Ireland, in accordance with EU Directive 2002/49/EC, is now complete. In total this included one agglomeration, one airport and approximately 600 km of major roads outside the agglomeration. These noise maps describe the level of noise exposure of approximately 1.25 million people. The first phase of noise mapping was dealt with by five noise mapping bodies while 26 action planning authorities were involved in the development of the associated action plans. The second phase of noise mapping, due to be completed in 2012, sees a reduction in the defined thresholds describing the required agglomerations, roads and railways that have to be mapped. This will have a significant impact on the extent of mapping required. In Ireland this will result in an increased number of local authorities being required to develop strategic noise maps for their area along with the further development of associated action plans. It is appropriate at this point to review the work process and results from the first phase of noise mapping in Ireland in order to establish areas that could be improved, throughout the noise mapping project. In this paper a review of the implementation procedures focussing on (dominant) road traffic noise is presented. It is identified that more standardisation is needed and this could be achieved by the establishment of a national expert steering group. Copyright © 2010 Elsevier Ltd. All rights reserved.
24 CFR 597.300 - HUD action and review of nominations for designation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND... ENTERPRISE COMMUNITIES: ROUND ONE DESIGNATIONS Designation Process § 597.300 HUD action and review of... and must be accompanied by a strategic plan, as required by § 597.200(c), and the certifications...
Affirmative Action Plan. Access, Equity, Opportunity. Fifth Edition.
ERIC Educational Resources Information Center
New York State Education Dept., Albany.
The Affirmative Action Plan of the New York State Education Department is described in this document. First, a policy statement is provided by the New York State Education Department, committing the Department to the development of: (1) programmatic approaches to the elimination of all unjust exclusionary employment practices, policies, and…
ERIC Educational Resources Information Center
Strachan, Glenn
2018-01-01
An objective of the European Union's Entrepreneurship 2020 Action Plan is to address high levels of youth unemployment in Europe by promoting entrepreneurship. Implementing entrepreneurship education in schools, colleges and universities is one of three strategic interventions proposed by the Action Plan. Sustainable entrepreneurship is a…
Vision 2015: The West Virginia Science and Technology Strategic Plan. Progress Report
ERIC Educational Resources Information Center
West Virginia Higher Education Policy Commission, 2014
2014-01-01
In 2005, West Virginia science and education leaders developed a strategic plan entitled: "Vision 2015: The West Virginia Science and Technology Strategic Plan." The plan is comprised of five (5) target areas for infrastructure development, with 14 goals for action by designated leaders from higher education, state government, and…
Scobbie, Lesley; Dixon, Diane; Wyke, Sally
2011-05-01
Setting and achieving goals is fundamental to rehabilitation practice but has been criticized for being a-theoretical and the key components of replicable goal-setting interventions are not well established. To describe the development of a theory-based goal setting practice framework for use in rehabilitation settings and to detail its component parts. Causal modelling was used to map theories of behaviour change onto the process of setting and achieving rehabilitation goals, and to suggest the mechanisms through which patient outcomes are likely to be affected. A multidisciplinary task group developed the causal model into a practice framework for use in rehabilitation settings through iterative discussion and implementation with six patients. Four components of a goal-setting and action-planning practice framework were identified: (i) goal negotiation, (ii) goal identification, (iii) planning, and (iv) appraisal and feedback. The variables hypothesized to effect change in patient outcomes were self-efficacy and action plan attainment. A theory-based goal setting practice framework for use in rehabilitation settings is described. The framework requires further development and systematic evaluation in a range of rehabilitation settings.
A Vision for the Future: Site-Based Strategic Planning.
ERIC Educational Resources Information Center
Herman, Jerry J.
1989-01-01
Presents a model to help principals with strategic planning. Success hinges on involving stakeholders, scanning for relevant data, identifying critical success factors, developing vision and mission statements, analyzing the site manager's supports and constraints, creating strategic goals and objectives, developing action plans, allocating…
Developing the 2012 national action plan for protecting children in agriculture.
Lee, Barbara C; Gallagher, Susan S; Liebman, Amy K; Miller, Mary E; Marlenga, Barbara
2012-01-01
In 1996 the US launched a National Childhood Agricultural Injury Prevention Initiative, guided by an action plan generated by a 42-member multidisciplinary committee. A major update to the plan was released following the 2001 Summit on Childhood Agricultural Injury Prevention. From the year 2010 through 2011 a comprehensive assessment of progress to date was conducted followed by the drafting, review and finalizing of a new action plan-"The 2012 Blueprint for Protecting Children in Agriculture." This paper briefly describes the purpose and process for generating the new action plan then provides a listing of the 7 goals and 26 strategies within the plan. These goals and strategies account for trends in childhood agricultural injuries, changes in agricultural production and the demographics of its workforce, effectiveness of interventions, and the increasing use of social media, marketing and social networking. Primary funding for this project was provided by the National Institute for Occupational Safety and Health (NIOSH), which continues to serve as the lead federal agency for the national initiative.
Organization Development: A Case Study in Blockages.
ERIC Educational Resources Information Center
McIntyre, Martin
1981-01-01
Organization Development is a management science that defines and solves organizational problems. Procedures include: (1) diagnosis of problem; (2) gathering of data related to problem; (3) obtaining feedback; (4) developing various change strategies; (5) developing an action plan; and (6) implementing the plan. (CJ)
ERIC Educational Resources Information Center
Zoellner, Brian P.; Chant, Richard H.; Lee, Kosze
2017-01-01
Our revised secondary teacher education professional development plan (PDP) project required preservice teachers to identify their teaching beliefs, use these beliefs to analyze practice, and create an action plan centered on a research question from this analysis. We predicted these plans would show evidence of Dewey's (1964) reflective…
Personal Money Planner. The CIRcular: Consumer Information Report 14.
ERIC Educational Resources Information Center
Bank of America NT & SA, San Francisco, CA.
This report gives suggestions for starting a personal money plan, provides a worksheet for developing the plan, and offers ideas for putting the plan into action. Guidelines are presented for the following steps in developing a money plan: setting short- and long-term spending and saving goals; making a timetable for reaching those goals;…
Joshi, Mohan P; Chintu, Chifumbe; Mpundu, Mirfin; Kibuule, Dan; Hazemba, Oliver; Andualem, Tenaw; Embrey, Martha; Phulu, Bayobuya; Gerba, Heran
2018-03-20
The multi-faceted complexities of antimicrobial resistance (AMR) require consistent action, a multidisciplinary approach, and long-term political commitment. Building coalitions can amplify stakeholder efforts to carry out effective AMR prevention and control strategies. We have developed and implemented an approach to help local stakeholders kick-start the coalition-building process. The five-step process is to (1) mobilise support, (2) understand the local situation, (3) develop an action plan, (4) implement the plan, and (5) monitor and evaluate. We first piloted the approach in Zambia in 2004, then used the lessons learned to expand it for use in Ethiopia and Namibia and to the regional level through the Ecumenical Pharmaceutical Network [EPN]. Call-to-action declarations and workshops helped promote a shared vision, resulting in the development of national AMR action plans, revision of university curricula to incorporate relevant topics, infection control activities, engagement with journalists from various mass media outlets, and strengthening of drug quality assurance systems. Our experience with the coalition-building approach in Ethiopia, Namibia, Zambia, and with the EPN shows that coalitions can form in a variety of ways with many different stakeholders, including government, academia, and faith-based organisations, to organise actions to preserve the effectiveness of existing antimicrobials and contain AMR.
Tiered on-the-ground implementation projects for Gulf of Mexico water quality improvements
USDA-ARS?s Scientific Manuscript database
Both the Gulf Hypoxia Action Plan for Reducing, Mitigating, and Controlling Hypoxia in the Northern Gulf of Mexico and Improving Water Quality in the Mississippi River Basin (USEPA 2008) and the GOMA Governors’ Action Plan II for Healthy and Resilient Coasts (GOMA 2009) call for the development and ...
State Action Plan for Iowa. "Marketing" Marketing Education.
ERIC Educational Resources Information Center
Omega Group, Inc., Haverford, PA.
An Iowa project identified curriculum, program standards, and a framework for promoting marketing education programs. The mission for the state action plan for marketing education is to develop a strategy to revitalize Iowa's marketing education for the 21st century. Three goals support this mission: (1) create a community-wide awareness of the…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-19
... the availability of the Record of Decision (ROD) for the General Management Plan/Wilderness Study (GMP... and development of the national monument in the GMP/WS/ FEIS, Alternative A--no action Alternative, and two action Alternatives. The preferred alternative (Alternative B) from the GMP/ WS/FEIS [[Page...
24 CFR 590.31 - Corrective and remedial action.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Corrective and remedial action. 590.31 Section 590.31 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND...
24 CFR 590.31 - Corrective and remedial action.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Corrective and remedial action. 590.31 Section 590.31 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND...
How the gastroenterology nurse can establish and meet career goals.
Greenwald, Beverly
2006-01-01
A career goal promotes professional growth for the gastroenterology nurse. Short-term goals (achievable in less than one year) focus toward attaining a long-term goal (achievable in 5 to 10 years). The steps to achieving a career goal are self-assessment, career goal development, action plan development, implementation of the action plan, evaluation, and the establishment of a new goal. A career goal must be specific, measurable, achievable, realistic, and have a specified time frame. A tailor-made action plan is a list of interventions to promote goal achievement within the specified time frame. A goal posted in a prominent area is less likely to be forgotten and can guide day-to-day activities. A career goal should be reviewed and revised at least annually. A professional resume documents these career achievements.
The national response for preventing healthcare-associated infections: data and monitoring.
Kahn, Katherine L; Weinberg, Daniel A; Leuschner, Kristin J; Gall, Elizabeth M; Siegel, Sari; Mendel, Peter
2014-02-01
Historically, the ability to accurately track healthcare-associated infections (HAIs) was hindered due to a lack of coordination among data sources and shortcomings in individual data sources. This paper presents the results of the evaluation of the HAI data and the monitoring component of the Action Plan, focusing on context (goals), inputs, and processes. We used the Content-Input-Process-Product framework, together with the HAI prevention system framework, to describe the transformative processes associated with data and monitoring efforts. Six HAI priority conditions in the 2009 Action Plan created a focus for the selection of goals and activities. Key Action Plan decisions included a phased-in data and monitoring approach, commitment to linking the selection of priority HAIs to highly visible national 5-year prevention targets, and the development of a comprehensive HAI database inventory. Remaining challenges relate to data validation, resources, and the opportunity to integrate electronic health and laboratory records with other provider data systems. The Action Plan's data and monitoring program has developed a sound infrastructure that builds upon technological advances and embodies a firm commitment to prioritization, coordination and alignment, accountability and incentives, stakeholder engagement, and an awareness of the need for predictable resources. With time, and adequate resources, it is likely that the investment in data-related infrastructure during the Action Plan's initial years will reap great rewards.
24 CFR 597.300 - HUD action and review of nominations for designation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT... and must be accompanied by a strategic plan, as required by § 597.200(c), and the certifications... evaluation. (d) Modification of the strategic plan, boundaries of nominated urban areas, and/or period during...
Purposeful Action Research: Reconsidering Science and Technology Teacher Professional Development
ERIC Educational Resources Information Center
vanOostveen, Roland
2017-01-01
Initial plans for this project arose from a need to address issues of professional development of science and technology teachers that went beyond the norm available within school board settings. Two teams of 4 teachers responded to an invitation to participate in a collaborative action research project. Collaborative action research was chosen in…
Sudore, Rebecca L.; Stewart, Anita L.; Knight, Sara J.; McMahan, Ryan D.; Feuz, Mariko; Miao, Yinghui; Barnes, Deborah E.
2013-01-01
Introduction Advance directives have traditionally been considered the gold standard for advance care planning. However, recent evidence suggests that advance care planning involves a series of multiple discrete behaviors for which people are in varying stages of behavior change. The goal of our study was to develop and validate a survey to measure the full advance care planning process. Methods The Advance Care Planning Engagement Survey assesses “Process Measures” of factors known from Behavior Change Theory to affect behavior (knowledge, contemplation, self-efficacy, and readiness, using 5-point Likert scales) and “Action Measures” (yes/no) of multiple behaviors related to surrogate decision makers, values and quality of life, flexibility for surrogate decision making, and informed decision making. We administered surveys at baseline and 1 week later to 50 diverse, older adults from San Francisco hospitals. Internal consistency reliability of Process Measures was assessed using Cronbach's alpha (only continuous variables) and test-retest reliability of Process and Action Measures was examined using intraclass correlations. For discriminant validity, we compared Process and Action Measure scores between this cohort and 20 healthy college students (mean age 23.2 years, SD 2.7). Results Mean age was 69.3 (SD 10.5) and 42% were non-White. The survey took a mean of 21.4 minutes (±6.2) to administer. The survey had good internal consistency (Process Measures Cronbach's alpha, 0.94) and test-retest reliability (Process Measures intraclass correlation, 0.70; Action Measures, 0.87). Both Process and Action Measure scores were higher in the older than younger group, p<.001. Conclusion A new Advance Care Planning Engagement Survey that measures behavior change (knowledge, contemplation, self-efficacy, and readiness) and multiple advance care planning actions demonstrates good reliability and validity. Further research is needed to assess whether survey scores improve in response to advance care planning interventions and whether scores are associated with receipt of care consistent with one's wishes. PMID:24039772
Person-Centered Transition Planning.
ERIC Educational Resources Information Center
Miner, Craig A.; Bates, Paul E.
1997-01-01
Describes a person-centered planning approach for involving students with disabilities and their families in the transition planning process. Components of person-centered planning are discussed, including development of a personal profile, identification of future lifestyle preferences, action steps and responsible parties, and necessary changes…
Improving our legacy: Incorporation of adaptive management into state wildlife action plans
Fontaine, J.J.
2011-01-01
The loss of biodiversity is a mounting concern, but despite numerous attempts there are few large scale conservation efforts that have proven successful in reversing current declines. Given the challenge of biodiversity conservation, there is a need to develop strategic conservation plans that address species declines even with the inherent uncertainty in managing multiple species in complex environments. In 2002, the State Wildlife Grant program was initiated to fulfill this need, and while not explicitly outlined by Congress follows the fundamental premise of adaptive management, 'Learning by doing'. When action is necessary, but basic biological information and an understanding of appropriate management strategies are lacking, adaptive management enables managers to be proactive in spite of uncertainty. However, regardless of the strengths of adaptive management, the development of an effective adaptive management framework is challenging. In a review of 53 State Wildlife Action Plans, I found a keen awareness by planners that adaptive management was an effective method for addressing biodiversity conservation, but the development and incorporation of explicit adaptive management approaches within each plan remained elusive. Only ???25% of the plans included a framework for how adaptive management would be implemented at the project level within their state. There was, however, considerable support across plans for further development and implementation of adaptive management. By furthering the incorporation of adaptive management principles in conservation plans and explicitly outlining the decision making process, states will be poised to meet the pending challenges to biodiversity conservation. ?? 2010 .
Improving our legacy: incorporation of adaptive management into state wildlife action plans.
Fontaine, Joseph J
2011-05-01
The loss of biodiversity is a mounting concern, but despite numerous attempts there are few large scale conservation efforts that have proven successful in reversing current declines. Given the challenge of biodiversity conservation, there is a need to develop strategic conservation plans that address species declines even with the inherent uncertainty in managing multiple species in complex environments. In 2002, the State Wildlife Grant program was initiated to fulfill this need, and while not explicitly outlined by Congress follows the fundamental premise of adaptive management, 'Learning by doing'. When action is necessary, but basic biological information and an understanding of appropriate management strategies are lacking, adaptive management enables managers to be proactive in spite of uncertainty. However, regardless of the strengths of adaptive management, the development of an effective adaptive management framework is challenging. In a review of 53 State Wildlife Action Plans, I found a keen awareness by planners that adaptive management was an effective method for addressing biodiversity conservation, but the development and incorporation of explicit adaptive management approaches within each plan remained elusive. Only ~25% of the plans included a framework for how adaptive management would be implemented at the project level within their state. There was, however, considerable support across plans for further development and implementation of adaptive management. By furthering the incorporation of adaptive management principles in conservation plans and explicitly outlining the decision making process, states will be poised to meet the pending challenges to biodiversity conservation. Published by Elsevier Ltd.
A citizens' plan for energy self-reliance. The process report: How it happened
NASA Astrophysics Data System (ADS)
Cohn, J.; Stayton, R.
Results are presented of a project undertaken to demonstrate that local action could meet the energy crisis in Santa Cruz, California, and to demonstrate that a community could cooperatively develop an energy plan for greater energy self reliance. Community participation took several forms: neighborhood outreach; community education and involvement, and media and press coverage of the project. An advisory board was formed and research was undertaken to determine the feasibility of energy ideas generated in the neighborhoods and to answer questions posed by the advisory board. Selection criteria were developed for use in screening individual actions. Thirty programs with more than 120 actions were approved and a list of 16 priorities was established. Actions implemented by the Advisory Board are noted.
Bridging knowledge to develop an action plan for integrated care for chronic diseases in Greece
Lionis, Christos; Yfantopoulos, John
2015-01-01
The health, social and economic impact of chronic diseases is well documented in Europe. However, chronic diseases threaten relatively more the ‘memorandum and peripheral’ Eurozone countries (i.e., Greece, Spain, Portugal and Ireland), which were under heavy recession after the economic crisis in 2009. Especially in Greece, where the crisis was the most severe across Europe, the austerity measures affected mainly people with chronic diseases. As a result, the urgency to tackle the threat of chronic diseases in Greece by promoting public health and providing effective chronic care while flattening the rising health care expenditure is eminent. In many European countries, integrated care is seen as a means to achieve this. The aim of this paper was to support Greek health policy makers to develop an action plan from 2015 onwards, to integrate care by bridging local policy context and needs with knowledge and experience from other European countries. To achieve this aim, we adopted a conceptual framework developed by the World Health Organization on one hand to analyse the status of integrated care in Greece, and on the other to develop an action plan for reform. The action plan was based on an analysis of the Greek health care system regarding prerequisite conditions to integrate care, a clear understanding of its context and successful examples of integrated care from other European countries. This study showed that chronic diseases are poorly addressed in Greece and integrated care is in embryonic stage. Greek policy makers have to realise that this is the opportunity to make substantial reforms in chronic care. Failing to reform towards integrated care would lead to the significant risk of collapse of the Greek health care system with all associated negative consequences. The action plan provided in this paper could support policy makers to make the first serious step to face this challenge. The details and specifications of the action plan can only be decided by Greek policy makers in close cooperation with other health and social care partners. This is the appropriate time for doing so. PMID:27118957
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 705.202 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopsis of Proposed Contract Actions 705.202 Exceptions. (a) [Reserved] (b) The head of the U.S. Agency for International Development has determined after consultation...
Can persuasive messages encourage individuals to create action plans for physical activity?
Sweet, Shane N; Brawley, Lawrence R; Hatchell, Alexandra; Gainforth, Heather L; Latimer-Cheung, Amy E
2014-08-01
Given the positive influence of action planning on physical activity, persuasive messages could be designed to promote action planning. The purpose of this paper was to test action planning messages in two studies. Participants were allocated to one of two message groups, reading either a physical activity only or physical activity plus action planning message (Study 1) and either a gain-framed or loss-framed action planning message (Study 2). The percent of individuals who created an action plan and the quality of the plans were evaluated. In Study 1, individuals in the physical activity plus action planning group created as many action plans as the physical activity only group, but their plans were higher quality. In Study 2, Week 2 differences between the gain- and loss-framed message groups were found for action planning. To our knowledge, these studies were the first to investigate message-induced action planning as a behavior. More research is needed to optimize these messages.
77 FR 29317 - Fiscal Year 2011 Draft Work Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-17
... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...
New developments in children's environmental health in Europe.
Tamburlini, Giorgio
2006-09-01
Important developments have taken place in Europe regarding children's environmental health (CEH) over the last few years. In 1999 the Third Ministerial Conference on Environment and Health identified CEH as a priority area and started a process of scientific review and policy development that culminated at the Fourth Ministerial Conference held in Budapest in June 2004 with the adoption of the Children's Environment and Health Action Plan for Europe (CEHAPE). The rationale of the CEHAPE is based on a thorough review of the scientific evidence on CEH and on a study that quantified for the first time the burden of disease related to the main environmental exposures of children and adolescents in Europe. The Action Plan suggests actions and policies to achieve the four main priority goals: clean air, safe water, chemical and physical agents, and injuries. Over the same period, the European Commission (EC) has strengthened its focus on environment and health issues, has supported research on CEH, and has developed a proposal for a new EU regulatory framework for chemicals that has clear implications for children and for the reproductive period. The proposed new system, called REACH (Registration, Evaluation, and Authorization of Chemicals), currently under examination by the European Parliament, aims at reducing risks to human health and improvement of environmental quality through the better and earlier identification of the properties of chemical substances. The EC also adopted policies and action plans that are very relevant to children, such as the EU European Environment and Health Strategy, referred to as the SCALE initiative (Science, Children, Awareness, Legislation, Evaluation), and the 2004-2010 Environment and Health Action Plan.
Restructuring: A School-Based Plan of Action.
ERIC Educational Resources Information Center
Rothberg, Robert A.; Bozeman, William C.
The processes by which school leaders can institutionalize staff and organizational development, with a focus on initiating school restructuring through team development, are described. Three features are necessary for implementing school restructuring through team development: a deliberate plan for staff involvement, a positive work environment,…
[Comprehensive drug safety plan in a health department].
Bujaldón-Querejeta, N; Aznar-Saliente, T; Esplá-González, S; Ruíz-Darbonnéns, S; Pons-Martínez, L; Talens-Bolos, A; Martínez-Ramírez, M; Camacho-Romera, D; Aranaz-Andrés, J M
2014-01-01
To develop and implement a comprehensive drug safety plan in a hospital for the years 2009-2011. Applying the Strengths Weaknesses/Limitations Opportunities Threats (SWOT) methodology, the baseline situation was analyzed and a broad strategy or plan was subsequently developed, defining the scope, responsibilities, objectives and strategic actions and indicators in order to measure the achievement of the results. A comprehensive drug safety plan with the main objective of identifying and reducing the medication-related problems in patients treated in the Hospital de San Juan in Alicante has been developed. The plan contains five strategic objectives, twenty strategic actions and the indicators to assess its outcomes. It also contains a timetable for its establishment and evaluation. Developing a comprehensive strategic plan allows the current situation relating to drug safety to be determined. The results obtained after its introduction will define its applicability. Due to the lack of publications of similar plans and results, the evaluation of this plan will be useful whether it is favorable or not. As a side benefit of the development, the multidisciplinary team continues to work on improving patient safety in the care process, and the safety culture continues to grow among the professionals. Copyright © 2013 SECA. Published by Elsevier Espana. All rights reserved.
The Search Conference as a Method in Planning Community Health Promotion Actions
Magnus, Eva; Knudtsen, Margunn Skjei; Wist, Guri; Weiss, Daniel; Lillefjell, Monica
2016-01-01
Aims: The aim of this article is to describe and discuss how the search conference can be used as a method for planning health promotion actions in local communities. Design and methods: The article draws on experiences with using the method for an innovative project in health promotion in three Norwegian municipalities. The method is described both in general and how it was specifically adopted for the project. Results and conclusions: The search conference as a method was used to develop evidence-based health promotion action plans. With its use of both bottom-up and top-down approaches, this method is a relevant strategy for involving a community in the planning stages of health promotion actions in line with political expectations of participation, ownership, and evidence-based initiatives. Significance for public health This article describe and discuss how the Search conference can be used as a method when working with knowledge based health promotion actions in local communities. The article describe the sequences of the conference and shows how this have been adapted when planning and prioritizing health promotion actions in three Norwegian municipalities. The significance of the article is that it shows how central elements in the planning of health promotion actions, as participation and involvements as well as evidence was a fundamental thinking in how the conference were accomplished. The article continue discussing how the method function as both a top-down and a bottom-up strategy, and in what way working evidence based can be in conflict with a bottom-up strategy. The experiences described can be used as guidance planning knowledge based health promotion actions in communities. PMID:27747199
Evidence of early development of action planning in the human foetus: a kinematic study.
Zoia, Stefania; Blason, Laura; D'Ottavio, Giuseppina; Bulgheroni, Maria; Pezzetta, Eva; Scabar, Aldo; Castiello, Umberto
2007-01-01
The aim of the present study was to investigate whether foetal hand movements are planned and how they are executed. We performed a kinematic analysis of hand movements directed towards the mouth and the eyes in the foetuses of eight women with normally evolving pregnancies. At 14, 18 and 22 weeks of gestation, eight foetuses underwent a 20-min four-dimensional-ultrasound session. The video recordings for these movements were then imported into in-house software developed to perform kinematic analysis. We found that spatial and temporal characteristics of foetal movements are by no means uncoordinated or unpatterned. By 22 weeks of gestation the movements seem to show the recognizable form of intentional actions, with kinematic patterns that depend on the goal of the action, suggesting a surprisingly advanced level of motor planning.
Being Prepared for Climate Change: A Workbook for Developing Risk-Based Adaptation Plans
This workbook is a guide for environmental professionals to construct a climate change adaptation plan based on identifying risks and their consequences. It incorporates watershed management, vulnerability assessments and action planning.
Studying action representation in children via motor imagery.
Gabbard, Carl
2009-12-01
The use of motor imagery is a widely used experimental paradigm for the study of cognitive aspects of action planning and control in adults. Furthermore, there are indications that motor imagery provides a window into the process of action representation. These notions complement internal model theory suggesting that such representations allow predictions (estimates) about the mapping of the self to parameters of the external world; processes that enable successful planning and execution of action. The ability to mentally represent action is important to the development of motor control. This paper presents a critical review of motor imagery research conducted with children (typically developing and special populations) with focus on its merits and possible shortcomings in studying action representation. Included in the review are age-related findings, possible brain structures involved, experimental paradigms, and recommendations for future work. The merits of this review are associated with the apparent increasing attraction for using and studying motor imagery to understand the developmental aspects of action processing in children.
Defense.gov - Special Report: VOTE
Voting Action Plan (pdf) 2013 USMC Voting Action Plan (pdf) 2013 Army Voting Action Plan (pdf) Air Force Voting Plan 2012-13 (pdf) Army Voting Action Plan 2012 (pdf) Marine Corps Voting Action Plan 2012 (pdf ) Navy Voting Action Plan (pdf) Overseas Vote Foundation Project Vote Smart Preparing for the 2012
The Clinical Learning Spiral: A Model to Develop Reflective Practitioners.
ERIC Educational Resources Information Center
Stockhausen, Lynette
1994-01-01
The Clinical Learning Spiral incorporates reflective processes into undergraduate nursing education. It entails successive cycles of four phases: preparative (briefing, planning), constructive (practice development), reflective (debriefing), and reconstructive (planning for change and commitment to action). (SK)
77 FR 14735 - New England Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-13
... development of two management actions. The Committee will continue development of an action to modify measures... goals and objectives and possible funding mechanisms. The Committee may also discuss full retention of... receive an update on Plan Development Team work related to possible modifications to groundfish closed...
Transforming Your Community. Empowering for Change.
ERIC Educational Resources Information Center
Moore, Allen B.; Brooks, Rusty
This book presents a "bottom-up" action learning and action planning approach to community economic development. It is based on a learning experience for adults to promote community economic development that became the Community Economic Development Program. The book is organized in 11 chapters that cover the following topics: (1) framework for…
Federal supports for state oral health plans.
Edelstein, Burton L
2012-01-01
The past decade has witnessed both a proliferation of state oral health plans that include very specific proposals for action and an emergence of federal laws that include support for oral health. This paper provides an overview of state oral health priorities for action as reflected in 40 oral health plans that were developed independently by states. It examines four federal laws - the 2002 Safety Net Improvement Act, the 2009 CHIP Reauthorization Act, the 2009 economic stimulus law, and the 2010 health reform law - to identify opportunities for alignment with action steps proposed in state plans. This analysis identifies 23 categories of activity proposed by states in their action plans and determines that all but six of these activities are now supported by one or more of these four federal laws. State activities undertaken through grants provided under the 2002 Safety Net Improvement Act are analyzed as an example of how states can leverage federal legislation to advance their oral health plans. The paper concludes with consideration of the steps needed for states to promote their oral health plans by leveraging the full capacity of federal legislation. © 2012 American Association of Public Health Dentistry.
48 CFR 705.207 - Preparation and transmittal of certain synopses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INTERNATIONAL DEVELOPMENT ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopsis of Proposed Contract Actions 705.207 Preparation and transmittal of certain synopses. The responsible contracting officer shall...
ORNL Remedial Action Program strategy (FY 1987-FY 1992)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trabalka, J.R.; Myrick, T.E.
1987-12-01
Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, andmore » eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.« less
Parkland College 2001-2003 Operational Plan.
ERIC Educational Resources Information Center
Parkland Coll., Champaign, IL.
This Parkland College (Illinois) Operational Plan supports the document titled Parkland College 1999-2004: A Strategic Plan for Excellence. Strategic goals and strategies are followed by specific operational action plans that support the completion of the given corresponding strategy. The four goals include: (1) to develop the highest educational…
The Greater Southern Area Health Service Tobacco Control Plan 2006-2009.
Gow, Andrew J; Weir, Kylie M; Marich, Andrew J N
2008-01-01
In response to the NSW Tobacco Action Plan 2005-2009, Greater Southern Area Health Service (GSAHS) has developed a local plan. This short report describes how activities promoted in the state plan were prioritised and six outcomes identified as the focus for the GSAHS Tobacco Control Plan 2006-2009.
Laine, Sari; Saaranen, Terhi; Pertel, Tiia; Hansen, Siivi; Lepp, Kädi; Tossavainen, Kerttu
2016-02-01
This article is part of a long term project "Promoting the Occupational Well-Being of School Staff-Action Research Project in Finland and Estonia, 2009-2014." The purpose of this article is to describe the significance of action plans in the promotion of the occupational well-being of primary and upper secondary school staff in Finland and Estonia from 2010 to the turn of the year 2011-2012. An electronic open questionnaire was sent to occupational well-being groups in Finland (N=18) and in Estonia (N=39). In Finland, the questionnaire was responded to by 16 (n=16) occupational well-being groups, and in Estonia, by 38 (n=38) groups. The qualitative data were analyzed using the inductive-deductive method and content analysis. The obtained results indicate that the schools had named goals for action plans in all aspects of the promotion of occupational well-being in schools (worker and work, working conditions, professional competence, working community) and that these goals were mainly realized in the schools in a systematic way. Schools felt that the action plan for occupational well-being helped them to set goals for occupational well-being and that the planned actions were realized in a more systematic way than before. Copyright © 2015 Elsevier Ltd. All rights reserved.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Criteria for approval of a plan of... Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MORTGAGE AND...
Strategic Plan for the Spanish Academy of Dermatology and Venerology (AEDV): FuturAEDV 2013-2017.
Ribera Pibernat, M; Moreno Jiménez, J C; Valcuende Cavero, F; Soto de Delás, J; Vázquez Veiga, H; Lázaro Ochaíta, P; Giménez Arnau, A
2014-09-01
The Spanish Academy of Dermatology and Venereology (AEDV) has decided that a Strategic Plan is needed to help the association adapt to new circumstances and anticipate future developments. 1) To position the AEDV as a medical association that can exert an influence in everything related to dermatology. 2) To contribute to the development of the specialty, strengthening the prestige and reputation of dermatology and dermatologists. 3) To establish a model for operating and strategic thinking that can be handed on to successive Boards of Directors and will enable the Academy to identify future challenges. The approach used to develop the Strategic Plan was as follows: analysis of trends in the health care system; assessment of the current situation of AEDV and of dermatology in general through an internal analysis based on surveys and interviews with academics; analysis of strengths, weaknesses, opportunities, and threats; preparation of a mission statement; and identification, development, and implementation of a strategy map prioritizing strategic lines of action. The strategy map set out 16 general goals grouped into 4 main topics (achieving the vision, internal and external customers, internal processes, and innovation) and detailed in an action plan with 19 initiatives, each with specific actions. The plan will be monitored by the Strategic Plan Monitoring Committee, which is made up of the members of the Standing Committee and the chairs of the 9 Technical Committees responsible for implementing the initiatives. The Functional Plan should guide the management of AEDV until 2017, and its implementation will enable the association to contribute to the development and prestige of the specialty and position itself as a reference in terms of its functional model. Copyright © 2014 Elsevier España, S.L.U. y AEDV. All rights reserved.
29 CFR 1910.38 - Emergency action plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action plans. (a) Application. An employer must have an emergency action plan whenever an OSHA standard in this...) Written and oral emergency action plans. An emergency action plan must be in writing, kept in the...
29 CFR 1910.38 - Emergency action plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action plans. (a) Application. An employer must have an emergency action plan whenever an OSHA standard in this...) Written and oral emergency action plans. An emergency action plan must be in writing, kept in the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
... Development. Appendix A Recipient State Amount APD Urban Planning Management, FL $500,000 LLC. Capital Access... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5499-FA-01] Announcement of Funding...) 2011 AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION...
Strategic planning: the basics and benefits.
Hansen, R D
1999-01-01
Strategic planning can help a medical practice take an honest look at itself in light of the changes taking place in its environment and within the practice itself. The objective is for the group to design a plan, or road map, to its envisioned future. For medical practices, strategic planning is a four part process: 1) gaining buy-in for the process itself from the leadership and physicians; 2) gathering pertinent data about the group's environment through external resources, and about the group itself through interviews and surveys of physicians; 3) conducting a facilitated off-site retreat of key physicians and leaders in order to review data, discuss issues and develop a one to two year action plan; and, 4) carrying out the action plan developed at the retreat and measuring its outcomes. A follow-up mini-retreat about six months after the first retreat is highly recommended, as is instituting a process of sharing of the results and outcomes of the plan with all members of the organization.
Development of a mentorship strategy: a knowledge translation case study.
Straus, Sharon E; Graham, Ian D; Taylor, Mark; Lockyer, Jocelyn
2008-01-01
There are many theories and frameworks for achieving knowledge translation, and the assortment can be confusing to those responsible for planning, evaluation, or policymaking in knowledge translation. A conceptual framework developed by Graham and colleagues provides an approach that builds on the commonalities found in an assessment of planned-action theories. This article describes the application of this knowledge to action framework to a mentorship initiative in academic medicine. Mentorship influences career success but is threatened in academia by increased clinical, research, and administrative demands. A case study review was undertaken of the role of mentors, the experiences of mentors and mentees, and mentorship initiatives in developing and retaining clinician scientists at two universities in Alberta, Canada. This project involved relevant stakeholders including researchers, university administrators, and research funders. The knowledge to action framework was used to develop a strategy for mentorship for clinician researchers. The framework highlights the need to identify and engage stakeholders in the process of knowledge implementation. A series of initiatives were selected and tailored to barriers and facilitators to implementation of the mentorship initiative; strategies for evaluating the knowledge use and its impact on outcomes were developed. The knowledge to action framework can be used to develop a mentorship initiative for clinician researchers. Future work to evaluate the impact of this intervention on recruitment and retention is planned.
78 FR 67393 - Change in Discount Rate for Water Resources Planning
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
... Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate...
29 CFR 1915.502 - Fire safety plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 7 2012-07-01 2012-07-01 false Fire safety plan. 1915.502 Section 1915.502 Labor... Employment § 1915.502 Fire safety plan. (a) Employer responsibilities. The employer must develop and implement a written fire safety plan that covers all the actions that employers and employees must take to...
29 CFR 1915.502 - Fire safety plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 7 2014-07-01 2014-07-01 false Fire safety plan. 1915.502 Section 1915.502 Labor... Employment § 1915.502 Fire safety plan. (a) Employer responsibilities. The employer must develop and implement a written fire safety plan that covers all the actions that employers and employees must take to...
29 CFR 1915.502 - Fire safety plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 7 2013-07-01 2013-07-01 false Fire safety plan. 1915.502 Section 1915.502 Labor... Employment § 1915.502 Fire safety plan. (a) Employer responsibilities. The employer must develop and implement a written fire safety plan that covers all the actions that employers and employees must take to...
Action Research to Support the Sustainability of Strategic Planning
ERIC Educational Resources Information Center
Antheil, Jane H.; Spinelli, Stephen, Jr.
2011-01-01
This article suggests that developing a strategic plan, even through a highly participative and data-driven process, is not sufficient to sustain change if implementation of the plan is not monitored as an organizational change event. To the degree that a strategic plan is institutionally transformative, monitoring change during implementation…
Tang, Jennifer; Lizaola, Elizabeth; Jones, Felica; Brown, Arleen; Stayton, Alix; Williams, Malcolm; Chandra, Anita; Eisenman, David; Fogleman, Stella; Plough, Alonzo
2013-01-01
Community resilience (CR) is a priority for preparedness, but few models exist. A steering council used community-partnered participatory research to support workgroups in developing CR action plans and hosted forums for input to design a pilot demonstration of implementing CR versus enhanced individual preparedness toolkits. Qualitative data describe how stakeholders viewed CR, how toolkits were developed, and demonstration design evolution. Stakeholders viewed community engagement as facilitating partnerships to implement CR programs when appropriately supported by policy and CR resources. Community engagement exercises clarified motivations and informed action plans (e.g., including vulnerable populations). Community input identified barriers (e.g., trust in government) and CR-building strategies. A CR toolkit and demonstration comparing its implementation with individual preparedness were codeveloped. Community-partnered participatory research was a useful framework to plan a CR initiative through knowledge exchange. PMID:23678916
76 FR 77300 - Alaska Federal Lands Long Range Transportation Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-12
... of and actions for coordinated planning and decision making among federal land management agencies... consolidate efforts through long-term coordination in transportation planning and decision-making processes... implementing projects; facilitating objective decision making for the transportation system; and developing...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-16
...-2012-0004] Draft Public Health Action Plan--A National Public Health Action Plan for the Detection...), Department of Health and Human Services (HHS). ACTION: Notice of availability and request for public comment..., Division of Reproductive Health, Attn: National Public Health Action Plan for the Detection, Prevention...
76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
...-2011-0002] Draft Action Plan--A Public Health Action Plan To Combat Antimicrobial Resistance AGENCY: Centers for Disease Control and Prevention (CDC), Department of Health and Human Services (DHHS). ACTION... requesting public comment on the draft A Public Health Action Plan to Combat Antimicrobial Resistance. HHS...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan, which...
76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
...-2011-0002] Draft Action Plan--A Public Health Action Plan To Combat Antimicrobial Resistance AGENCY: Centers for Disease Control and Prevention (CDC), Department of Health and Human Services (DHHS). ACTION... Federal Register requesting public comment on the draft, A Public Health Action Plan to Combat...
Standardization of quality control plans for highway bridges in Europe: COST Action TU 1406
NASA Astrophysics Data System (ADS)
Casas, Joan R.; Matos, Jose Campos e.
2017-09-01
In Europe, as all over the world, the need to manage roadway bridges in an efficient way led to the development of different management systems. Hence, nowadays, many European countries have their own system. Although they present a similar architectural framework, several differences can be appointed. These differences constitute a divergent mechanism that may conduct to different decisions on maintenance actions. Within the roadway bridge management process, the identification of maintenance needs is more effective when developed in a uniform and repeatable manner. This process can be accomplished by the identification of performance indicators and definition of performance goals and key performance indicators (KPI), improving the planning of maintenance strategies. Therefore, a discussion at a European level, seeking to achieve a standardized approach in this subject, will bring significant benefits. Accordingly, a COST Action is under way in Europe with the aim of standardizing the establishment of quality control plans for roadway bridges.
20 CFR 633.315 - Replacement, corrective action, termination.
Code of Federal Regulations, 2012 CFR
2012-04-01
... subrecipient agreements, development of and compliance with corrective action plans, etc. (c) In cases where..., section 402 programs by reason of congressional action, whether by authorization, appropriation, deferral... onsite, seize bank accounts relating to the program, arrange for the payment of legitimate bills and...
20 CFR 633.315 - Replacement, corrective action, termination.
Code of Federal Regulations, 2011 CFR
2011-04-01
... subrecipient agreements, development of and compliance with corrective action plans, etc. (c) In cases where..., section 402 programs by reason of congressional action, whether by authorization, appropriation, deferral... onsite, seize bank accounts relating to the program, arrange for the payment of legitimate bills and...
Rethinking Affirmative Action on Campus.
ERIC Educational Resources Information Center
La Noue, George R.
1995-01-01
The legal validity and public support of racial, ethnic, and gender preferences are eroding, and all affirmative action programs must be reconsidered. All American colleges and universities must develop new plans for affirmative action programs. Policies should cover admission, financial aid, employment, and contracting. Three primary models focus…
Effing, Tanja W; Lenferink, Anke; Buckman, Julie; Spicer, Deborah; Cafarella, Paul A; Burt, Morton G; Bassett, Katherine L; van Ommeren, Clara; Anesbury, Sally; van der Valk, Paul D L P M; Frith, Peter A; van der Palen, Job
2014-11-01
Patient-initiated action plans are an important component of COPD self-management (SM) interventions. When integrated into SM interventions, these action plans have proven to be effective in reducing exacerbation severity, hospitalisations, and costs and in improving health status in patients with COPD without severe comorbidities. Because of overlap in symptoms, a self-treatment (ST) approach that focuses solely on traditional symptoms of COPD is inadequate for patients with COPD and comorbidities. The COPE-III SM intervention combines (I) patient-initiated action plans that are tailored to the individual's co-morbid disease(s), and (II) ongoing nurse support. In this paper we provide information regarding the integration of information from two previous COPD SM studies (COPE I and II) in the development of the current COPE-III ST approach. COPE-III ST materials include daily symptom diaries and action plans that take patient's common comorbidities [chronic heart failure (CHF), anxiety, depression, ischaemic heart disease (IHD), and diabetes] into account. The comorbid diary and action plans components were developed in collaboration with multiple disease-experts. Previous SM studies have highlighted some essential topics that need to be considered when developing a SM or ST approach: 'when to initiate ST', 'how to optimize materials and safety', and 'how to achieve behavioural change'. In the COPE-III study, ST is initiated after a significant change in symptoms. This is consistent with the COPE-II approach and was implemented because disease symptoms are often present even when patients are stable. We have tried to ensure patient safety by providing an easily accessible case-manager to patients throughout their involvement in the study. Furthermore, a psychologist has ensured the use of behavioural change techniques throughout the intervention. We should continue to learn from our experiences with SM interventions to further optimize future SM and ST interventions. The use of materials that are suitable for different levels of patient literacy and the training of health care providers are other points of improvement.
ERIC Educational Resources Information Center
National Migrant Resource Program, Inc., Austin, TX.
This proceedings contains commissioned background papers used by conference work groups focusing on nine aspects of farmworker substance abuse, and the action plan developed by the work groups. The keynote address by Felipe G. Castro examines risk factors for substance abuse and addiction among Chicano farmworkers, particularly adolescent and…
ERIC Educational Resources Information Center
Freedman, Marjorie R.; Wood, Helen
2011-01-01
This pilot study developed and tested a tool in a group of multiethnic seniors (n = 24). The tool enabled these older adults to self-assess their stage of change regarding fruit and vegetable intake, and identified those in the preparation stage who were most likely to participate in follow-up action planning classes. (Contains 1 figure.)
2013-05-01
Regulation The Proposed Action would not affect local government comprehensive plans. Requires local governments to prepare, adopt, and implement...state-level planning efforts. Requires the development of special statewide plans governing water use, land development, and transportation...cleared area in state waters. However, avoidance of this area would not be significantly burdensome for tourists or recreational users of the Gulf, as
Interpretation and Manipulation in Human Plans. Technical Report No. 317.
ERIC Educational Resources Information Center
Newman, Denis; Bruce, Bertram
Analysis of students' interpretations of a complex episode of social interaction was used to illustrate three features of human plans that distinguish them from robot plans and that form a basis for a theory of the development of social action. The features illustrated are that (1) human plans are social, (2) human plans operate on…
Smart Discipline for the Classroom: Respect and Cooperation Restored. Third Edition.
ERIC Educational Resources Information Center
Koenig, Larry
This book helps teachers develop personal plans of action to handle classroom discipline, offering progressive Plan A and Plan B strategies. Plan A strategies take seconds to implement. Plan B strategies take more time but are designed to turn around specific attitudes and behaviors. After an introduction, there are 9 chapters: (1) "Misbehaviors…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-27
...-2012-0004] Draft Public Health Action Plan--A National Public Health Action Plan for the Detection...), Department of Health and Human Services (HHS). ACTION: Extension of public comment period. SUMMARY: On May 16... National Public Health Action Plan for the Detection, Prevention, and Management of Infertility (77 FR...
Effectiveness of participatory planning for community management of fisheries in Bangladesh.
Sultana, Parvin; Abeyasekera, Savitri
2008-01-01
This study provides statistical evidence that support for community-based management of resources was more effective when initiated through a process known as participatory action plan development (PAPD). Thirty-six sites were studied where community management of fisheries was facilitated by NGOs. All involved community participation and establishing local fisheries management institutions. However, communities were able to take up more conservation-related interventions and faced fewer conflicts in the 18 sites where a PAPD was the basis for collective action and institution development. This indicates the value and effectiveness of adopting good practice in participatory planning, such as PAPD, which helps diverse stakeholders find common problems and solutions for natural resource management.
Personality Traits and Training Initiation Process: Intention, Planning, and Action Initiation.
Laguna, Mariola; Purc, Ewelina
2016-01-01
The article aims at investigating the role of personality traits in relation to training initiation. Training initiation is conceptualized as a goal realization process, and explained using goal theories. There are three stages of the process analyzed: intention to undertake training, plan formulation, and actual training undertaking. Two studies tested the relationships between five personality traits, defined according to the five factor model, and the stages of the goal realization process. In Study 1, which explains training intention and training plans' formulation, 155 employees participated. In Study 2, which was time-lagged with two measurement points, and which explains intention, plans, and training actions undertaken, the data from 176 employees was collected at 3 month intervals. The results of these studies show that personality traits, mainly openness to experience, predict the training initiation process to some degree: intention, plans, and actual action initiation. The findings allow us to provide recommendations for practitioners responsible for human resource development. The assessment of openness to experience in employees helps predict their motivation to participate in training activities. To increase training motivation it is vital to strengthen intentions to undertake training, and to encourage training action planning.
Open Questions Limiting the Practice of Interorganizational Development.
ERIC Educational Resources Information Center
Schermerhorn, John R., Jr.
1981-01-01
Summarizes the open questions that must be answered by researchers if practioners of interorganizational development are to have adequate planning-and-action guidelines. Suggests the questions should help practitioners become more sensitive to potential action considerations that may require special thought and attention until a firmer knowledge…
ERIC Educational Resources Information Center
Saurino, Penny L.; Saurino, Dan R.
Elementary teachers collaborated on a research project that investigated how a constructivist approach to gifted and talented integrated curriculum strategies and techniques could be developed and implemented. The collaborative group action research cycle involved planning, collecting baseline data, intervening strategies/modifying interventions,…
Flexible Coordination in Resource-Constrained Domains
1994-07-01
Experiments (TIEs) with planning technologies developed at both BBN (FMERG) and SRI ( SOCAP ). We have also exported scheduling support capabilities provided by...SRI’s SOCAP course of action (COA) plan generator. "* Development and demonstration of distributed, multi-level deployment scheduling - Through analysis...scheduler was adapted for integration with the SOCAP planning system to provide feedback on transportation feasibility during generation of the
ERIC Educational Resources Information Center
Minnesota State Board for Vocational Education, St. Paul.
In March 1982, the Minnesota Division of Vocational-Technical Education received requests from State legislators to develop an action plan to address the problems of declining enrollments and resources. In response to this request, a plan was developed whereby area vocational-technical institutes (AVTIs) in the State would (1) promote a process…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-18
... grants pursuant to section 214 of the Appalachian Regional Development Act of 1965, Public Law 89-4, 79... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5556-D-01] Consolidated Delegation of Authority for the Office of Community Planning and Development AGENCY: Office of the Secretary, HUD. ACTION...
Developing Capacity for Cities to Adapt to a Changing Climate-a Case Study in Boulder, Colorado
NASA Astrophysics Data System (ADS)
Sands, R.; Groves, D. G.; Nason, M.; Pandya, R.
2016-12-01
The City of Boulder in Colorado has undertaken many progressive climate-related initiatives, from signing the Kyoto protocol to passing a Climate Action Tax. But as the city prepared to launch its Climate Commitment document and lead a community process, it realized that one critical group that had not been fully engaged in the process was its own staff. It became clear that for organizational change to occur and for the city to meet its goals, city staff needed to develop a deeper understanding of the importance of the climate goals while also learning better how to use these goals to guide their long-term planning. In early 2016, the city launched a year-long "Climate Leaders" initiative which comprised of a series of workshops that brought together over 70 staff members with climate scientists and experts in climate adaptation planning. The first two workshops, billed as Climate 101 and 201, reviewed the best available scientific information about climate threats and potential impacts, and worked with participants to understand how climate changes could affect diverse city functions. These interactive workshops also explored ways to help city staff feel comfortable preparing for a significantly different climate and discussed ways to communicate this information to the public. From there the group split into two tracks. A "mitigation" track focused on the ways in which Boulder could meet its aggressive emissions reduction targets. The "adaptation" track developed integrated scenarios for citywide planning to highlight Boulder's vulnerability to climate change and guide adaptation planning. Bringing these two conversations together is helping city staff to explore critical linkages between mitigation and adaptation, develop common messages to build community support for climate action, and inform comprehensive climate resiliency planning. We will describe how Boulder successfully partnered with scientists and planning experts to program a year of interactive workshops to bring diverse city staff into the climate action process. We will share outcomes from the development of the integrated climate scenarios vulnerability assessment and adaptation planning. Lastly we will share key lessons learned that will be valuable to other cities and jurisdictions engaging in similar climate action.
The components of action planning and their associations with behavior and health outcomes.
Lorig, Kate; Laurent, Diana D; Plant, Kathryn; Krishnan, Eswar; Ritter, Philip L
2014-03-01
Based on the works of Kiesler and Bandura, action plans have become important tools in patient self-management programs. One such program, shown effective in randomized trials, is the Internet Chronic Disease Self-Management Program. An implementation of this program, Healthy Living Canada, included detailed information on action plans and health-related outcome measures. Action plans were coded by type, and associations between action plans, confidence in completion and completion were examined. Numbers of Action Plans attempted and competed and completion rates were calculated for participants and compared to six-month changes in outcomes using regression models. Five of seven outcome measures significantly improved at six-months. A total of 1136 action plans were posted by 254 participants in 12 workshops (mean 3.9 out of 5 possible); 59% of action plans involved exercise, 16% food, and 14% role management. Confidence of completion was associated with completion. Action plan completion measures were associated with improvements in activity limitation, aerobic exercise, and self-efficacy. Baseline self-efficacy was associated with at least partial completion of action plans. Action planning appears to be an important component of self-management interventions, with successful completion associated with improved health and self-efficacy outcomes.
Actions That Could Reduce Water Temperature
Appendix F from Being Prepared for Climate Change: A Workbook for Developing Risk-Based Adaptation Plans, lists actions that could lower water temperture, and notes their cobenefits for urban stormwater control or restoring watersheds.
Poeton, Richard W; Glines, Wayne M; McBaugh, Debra
2009-01-01
Since 11 September 2001, improvised nuclear devices have become recognized as an important radiological threat requiring emergency response planning. Although Protective Action Guidance is well established for fixed nuclear facilities, correspondingly well-developed guidance does not exist for nuclear explosions. The Washington State Department of Health has developed preplanned Protective Action Recommendations for improvised nuclear device explosions. These recommendations recognize the need for advice to the public soon after such an event, before significant data are available. They can be used before significant outside support is available locally, and reference observable effects so people can use them if communications were disabled. The recommendations focus on early actions (24-48 h) and place priority on actions to avoid deterministic health effects due to residual fallout. Specific emphasis is placed on determining recommendations for evacuation, as well as the extent of the area for sheltering. The key recommendations developed for an initial public response are: (1) if there is ready access to robust shelter such as an underground basement or interior spaces in a multi-story structure, immediate sheltering in these areas is the best action, regardless of location; (2) if robust shelter is not available, and if fallout is observed in the area, then evacuation is the best general recommendation for locations within 16 km (10 miles) of the explosion; and (3) beyond 16 km (10 miles), the generally recommended protective action is to shelter in the best-protected location which is readily available.
State survey of medical boards regarding abrupt loss of a prescriber of controlled substances.
Sera, Leah; Brown, Micke; McPherson, Mary Lynn; Walker, Kathryn A; Klein-Schwartz, Wendy
The purpose of the study was to evaluate states' experiences with abrupt changes in controlled substances (CS) prescribing, to determine whether states have action plans in place to manage such situations, and describe the components of any such plans. A survey of executive directors of 51 medical boards was conducted to evaluate states' experiences with abrupt changes in CS prescribing, the extent of consumer complaints attributed to these events, and the types of plans in place to manage these situations. Forty-six executive directors of medical boards responded. Twenty boards (43.5 percent) confirmed that their state had experienced abrupt loss of CS providers and 11 (55 percent) of these executive directors indicated that the loss resulted in increased consumer complaints. The majority of executive directors (86 percent) had no action plan. Six executive directors reported some type of action plan or process consisting of regulatory action, patient-provider connection, professional education, patient education, or public notice. Most states do not have operational plans in place. However, a few have key strategies that may be useful in addressing potential problems following abrupt loss of a CS prescriber. State medical boards can play a significant role in the development of comprehensive preparedness plans to mitigate damage from the loss of CS prescribers in the community.
Fiore, Michael C.; Croyle, Robert T.; Curry, Susan J.; Cutler, Charles M.; Davis, Ronald M.; Gordon, Catherine; Healton, Cheryl; Koh, Howard K.; Orleans, C. Tracy; Richling, Dennis; Satcher, David; Seffrin, John; Williams, Christine; Williams, Larry N.; Keller, Paula A.; Baker, Timothy B.
2004-01-01
In August 2002, the Subcommittee on Cessation of the Interagency Committee on Smoking and Health (ICSH) was charged with developing recommendations to substantially increase rates of tobacco cessation in the United States. The subcommittee’s report, A National Action Plan for Tobacco Cessation, outlines 10 recommendations for reducing premature morbidity and mortality by helping millions of Americans stop using tobacco. The plan includes both evidence-based, population-wide strategies designed to promote cessation (e.g., a national quitline network) and a Smokers’ Health Fund to finance the programs (through a $2 per pack excise tax increase). The subcommittee report was presented to the ICSH (February 11, 2003), which unanimously endorsed sending it to Secretary Thompson for his consideration. In this article, we summarize the national action plan. PMID:14759928
Fiore, Michael C; Croyle, Robert T; Curry, Susan J; Cutler, Charles M; Davis, Ronald M; Gordon, Catherine; Healton, Cheryl; Koh, Howard K; Orleans, C Tracy; Richling, Dennis; Satcher, David; Seffrin, John; Williams, Christine; Williams, Larry N; Keller, Paula A; Baker, Timothy B
2004-02-01
In August 2002, the Subcommittee on Cessation of the Interagency Committee on Smoking and Health (ICSH) was charged with developing recommendations to substantially increase rates of tobacco cessation in the United States. The subcommittee's report, A National Action Plan for Tobacco Cessation, outlines 10 recommendations for reducing premature morbidity and mortality by helping millions of Americans stop using tobacco. The plan includes both evidence-based, population-wide strategies designed to promote cessation (e.g., a national quitline network) and a Smokers' Health Fund to finance the programs (through a 2 US dollar per pack excise tax increase). The subcommittee report was presented to the ICSH (February 11, 2003), which unanimously endorsed sending it to Secretary Thompson for his consideration. In this article, we summarize the national action plan.
Young children with autism spectrum disorder use predictive eye movements in action observation.
Falck-Ytter, Terje
2010-06-23
Does a dysfunction in the mirror neuron system (MNS) underlie the social symptoms defining autism spectrum disorder (ASD)? Research suggests that the MNS matches observed actions to motor plans for similar actions, and that these motor plans include directions for predictive eye movements when observing goal-directed actions. Thus, one important question is whether children with ASD use predictive eye movements in action observation. Young children with ASD as well as typically developing children and adults were shown videos in which an actor performed object-directed actions (human agent condition). Children with ASD were also shown control videos showing objects moving by themselves (self-propelled condition). Gaze was measured using a corneal reflection technique. Children with ASD and typically developing individuals used strikingly similar goal-directed eye movements when observing others' actions in the human agent condition. Gaze was reactive in the self-propelled condition, suggesting that prediction is linked to seeing a hand-object interaction. This study does not support the view that ASD is characterized by a global dysfunction in the MNS.
The World Health Assembly resolution on antimicrobial resistance.
Shallcross, Laura J; Davies, Sally C
2014-11-01
Antimicrobial resistance is a global problem that can only be tackled successfully through strengthened international partnerships. A concerted political, scientific and media campaign has garnered support for the recent World Health Assembly resolution on antimicrobial resistance, mandating the WHO to develop a global action plan. This resolution has the 'One Health' approach at its core, emphasizing collaboration across human and animal health sectors at the international, national and regional levels, coupled with strong leadership and the political will to act. Key themes are communication, prevention of infection, using knowledge to guide action, sustainability and optimizing the use of antimicrobial medicines and diagnostic devices. Implementation of the global action plan will require member states to make a commitment to developing national action plans and strengthening capacity, building on collaborations between the WHO, the World Organisation for Animal Health, the World Bank, Codex Alimentarius and the Transatlantic Task Force on Antimicrobial Resistance. © The Author 2014. Published by Oxford University Press on behalf of the British Society for Antimicrobial Chemotherapy. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.
24 CFR 968.315 - Comprehensive Plan (including five-year action plan).
Code of Federal Regulations, 2010 CFR
2010-04-01
... for the development, except for emergencies and essential non-routine maintenance necessary to... undertaken by the PHA in major work categories (e.g., kitchens, electrical systems, etc.); establishing...
Riedel, Natalie; van Kamp, Irene; Köckler, Heike; Scheiner, Joachim; Loerbroks, Adrian; Claßen, Thomas; Bolte, Gabriele
2017-01-01
The Environmental Noise Directive expects residents to be actively involved in localising and selecting noise abatement interventions during the noise action planning process. Its intervention impact is meant to be homogeneous across population groups. Against the background of social heterogeneity and environmental disparities, however, the impact of noise action planning on exposure to traffic-related noise and its health effects is unlikely to follow homogenous distributions. Until now, there has been no study evaluating the impact of noise action measures on the social distribution of traffic-related noise exposure and health outcomes. We develop a conceptual (logic) model on cognitive-motivational determinants of residents’ civic engagement and health (inequities) by integrating arguments from the Model on household’s Vulnerability to the local Environment, the learned helplessness model in environmental psychology, the Cognitive Activation Theory of Stress, and the reserve capacity model. Specifically, we derive four hypothetical patterns of cognitive-motivational determinants yielding different levels of sustained physiological activation and expectancies of civic engagement. These patterns may help us understand why health inequities arise in the context of noise action planning and learn how to transform noise action planning into an instrument conducive to health equity. While building on existing frameworks, our conceptual model will be tested empirically in the next stage of our research process. PMID:28556813
Riedel, Natalie; van Kamp, Irene; Köckler, Heike; Scheiner, Joachim; Loerbroks, Adrian; Claßen, Thomas; Bolte, Gabriele
2017-05-30
The Environmental Noise Directive expects residents to be actively involved in localising and selecting noise abatement interventions during the noise action planning process. Its intervention impact is meant to be homogeneous across population groups. Against the background of social heterogeneity and environmental disparities, however, the impact of noise action planning on exposure to traffic-related noise and its health effects is unlikely to follow homogenous distributions. Until now, there has been no study evaluating the impact of noise action measures on the social distribution of traffic-related noise exposure and health outcomes. We develop a conceptual (logic) model on cognitive-motivational determinants of residents' civic engagement and health (inequities) by integrating arguments from the Model on household's Vulnerability to the local Environment, the learned helplessness model in environmental psychology, the Cognitive Activation Theory of Stress, and the reserve capacity model. Specifically, we derive four hypothetical patterns of cognitive-motivational determinants yielding different levels of sustained physiological activation and expectancies of civic engagement. These patterns may help us understand why health inequities arise in the context of noise action planning and learn how to transform noise action planning into an instrument conducive to health equity. While building on existing frameworks, our conceptual model will be tested empirically in the next stage of our research process.
ERIC Educational Resources Information Center
ADDINGTON, HAROLD E.; AND OTHERS
A PROPOSAL WAS MADE TO PREVENT AND CONTROL JUVENILE DELINQUENCY BY OPENING OPPORTUNITIES AND DEVELOPING COMPETENCE AMONG DISADVANTAGED YOUTH. THE TOTAL COMMUNITY WAS MOBILIZED TO DEVELOP A PROGRAM TO ATTACK THE PROBLEM AT ALL LEVELS THEY WORKED FOR 18 MONTHS TO PLAN A SERIES OF CREATIVE ACTION PROGRAMS IN EDUCATION, EMPLOYMENT, AND COMMUNITY…
Involving Stakeholders in Determining Professional Development Center Attendance Policies.
ERIC Educational Resources Information Center
Good, Jennifer
2003-01-01
This action research project targeted teacher absenteeism at professional development events, findings no significant patterns in time of day, location, workshop topic, and teaching level. Instead, a pattern of chronic absenteeism for some individuals was noted. An action plan included increased marketing, communication with individual no-show…
Designing a Standard Model for Development and Execution of an Analysis Project Plan
2012-06-01
mitigations set forth are agreeable to all parties involved. 1.3 Document Risks, Issues, and Constraints 1.1 Gather Information 1.2 Develop...parent requirement into lower level objective, performance-based sibling actions. Collective accomplishment of the set of derived “ sibling ” actions
24 CFR 91.15 - Submission date.
Code of Federal Regulations, 2010 CFR
2010-04-01
... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS General § 91.15 Submission date. (a... process, the action plan, and the certifications must be submitted on an annual basis. (2) The housing, and homeless needs assessment, market analysis, and strategic plan must be submitted at least once...
Modeling the Theory of Planned Behavior from Survey Data for Action Choice in Social Simulations
2010-03-01
develop an argument for the benefits of informing action choice models such as TPB from representative survey data. 1. Introduction Icek Ajzen’s...matter expert (SME) input, such as the development of narrative ethnographies, and quantitative survey and polling data, such as the U.S. General...societies, a full description of the TPB implementation within an artificial society, and develop an argument for the benefits of informing action choice
Climate Neutral Research Campuses | NREL
the background. Set an example for climate neutrality. Use NREL's climate action planning process and more. Climate Action Planning Process Identify the best technology options for a climate action plan . Climate Action Planning Tool Identify the best technology options for a climate action plan. Technology
29 CFR 1926.35 - Employee emergency action plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 8 2012-07-01 2012-07-01 false Employee emergency action plans. 1926.35 Section 1926.35... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all emergency action plans required by a particular OSHA standard. The emergency action plan shall be in writing...
29 CFR 1926.35 - Employee emergency action plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Employee emergency action plans. 1926.35 Section 1926.35... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all emergency action plans required by a particular OSHA standard. The emergency action plan shall be in writing...
29 CFR 1926.35 - Employee emergency action plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 8 2013-07-01 2013-07-01 false Employee emergency action plans. 1926.35 Section 1926.35... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all emergency action plans required by a particular OSHA standard. The emergency action plan shall be in writing...
29 CFR 1926.35 - Employee emergency action plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 8 2014-07-01 2014-07-01 false Employee emergency action plans. 1926.35 Section 1926.35... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all emergency action plans required by a particular OSHA standard. The emergency action plan shall be in writing...
ERIC Educational Resources Information Center
Devlin, Patricia
2011-01-01
The impact of the Self-Determined Career Development Model (hereafter called the Self-Determined Career Model) on the job performance of four adults with moderate intellectual disability employed in competitive work settings was examined. Employees learned to set work-related goals, develop an action plan, implement the plan, and adjust their…
75 FR 66319 - State Systems Advance Planning Document (APD) Process
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
...) equipment and services. The APD process was designed to mitigate financial risks, avoid incompatibilities... develop a General Systems Design (GSD). Implementation APD means a recorded plan of action to request Federal financial participation (FFP) in the costs of designing, developing and implementing the system...
The Australian-Ness of Curriculum Jigsaws: Where Does Environmental Education Fit?
ERIC Educational Resources Information Center
Gough, Annette
2011-01-01
This paper reviews Australian Government actions related to environmental education, particularly in the past decade, and examines the actions forthcoming from two national action plans (Environment Australia, 2000 and DEWHA, 2009), the implementation strategy for the Decade of ESD (DEWHA, 2006) and developments related to the Australian…
ERIC Educational Resources Information Center
Peterson, Mark
This extension education publication contains insights and tools to help community members develop a strategic vision and action plan for their community. Presented first are an executive summary and an introduction that includes 10 reasons for a strategic visioning process. The first section, which deals with harnessing the power of vision,…
40 CFR Appendix F to Part 112 - Facility-Specific Response Plan
Code of Federal Regulations, 2011 CFR
2011-07-01
... of Contents 1.0Model Facility-Specific Response Plan 1.1Emergency Response Action Plan 1.2Facility.... EC01MR92.015 1.1Emergency Response Action Plan Several sections of the response plan shall be co-located... sections shall be called the Emergency Response Action Plan. The Agency intends that the Action Plan...
Thomas P. Hodgman
2005-01-01
State agencies are often considered the prime avenues for implementation of Partners in Flight (PIF) bird conservation plans. Yet, such agencies already have in place a planning structure, which allows for dispersal of Federal Aid funds and guides management actions. Consequently, superimposing additional planning frameworks (e.g., PIF bird conservation plans) on state...
Patterson, Tamatha A.; Grundel, Ralph
2014-01-01
Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.
School Emergency Planning Guide. [Revised.
ERIC Educational Resources Information Center
Pennsylvania State Emergency Management Agency, Harrisburg.
Guidelines to help school districts in Pennsylvania recognize potential hazards and develop a plan of community action are presented in this guidebook. The 1988 Emergency Management Services Code requires that every publicly funded state school have a disaster response plan that is exercised annually. Further, all publicly funded educational…
40 CFR 763.93 - Management plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names and...
40 CFR 763.93 - Management plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names and...
40 CFR 763.93 - Management plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names and...
40 CFR 763.93 - Management plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including... actions or preventive measures taken to reduce asbestos exposure, including if possible, the names and...
ERIC Educational Resources Information Center
Illinois Univ., Urbana. Dept. of Vocational and Technical Education.
This report of a project to begin to develop a plan for research, development, and instruction in adult vocational education in Illinois has two specific goals: (1) to identify the current status of adult vocational education in Illinois and (2) to recommend key directions for state actions. It presents information collected through a…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
75 FR 62507 - New England Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
... Committee and Plan Development Team in October 2010 to consider actions affecting New England fisheries in... jointly with the Habitat Plan Development Team to discuss management alternatives related to minimizing... Council's EFH Omnibus Amendment 2. The goal of the meeting is to craft a series of management alternatives...
In 1985, the Buzzards Bay Project was established with the goal of developing and implementing management recommendations that would preserve and protect water quality and living resources in Buzzards Bay. The development of the Buzzards Bay CCMP is an example of an emerging nati...
Developing an Academic Information Resources Master Plan: A Paradigm.
ERIC Educational Resources Information Center
Gentry, H. R.
Since 1980, Johnson County Community College (JCCC) has rapidly expanded its use of personal computers in instruction and administration. Many computers were being acquired, however, before appropriate policies, plans, and procedures were developed for their effective management. In response to this problem, the following actions were identified…
75 FR 60759 - Enforcement Action Plan for Promotion and Advertising Restrictions; Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-01
...] Enforcement Action Plan for Promotion and Advertising Restrictions; Availability AGENCY: Food and Drug... availability of a document entitled ``Enforcement Action Plan for Promotion and Advertising Restrictions'' (Enforcement Action Plan), which describes FDA's plan to enforce the restrictions on promotion and advertising...
Social and environmental issues in developing vegetation and fire management plans
Leonard Charles
1995-01-01
To reduce the risk of wildfire in the California urban interface often requires actions that will be viewed by members of the public as having adverse effects on such resources as wildlife, vegetation, views, air quality, and recreational opportunities. These citizens can substantially delay and even thwart development of fire management plans. In developing such a...
Ziegahn, Linda; Styne, Dennis; Askia, Joyce; Roberts, Tina; Lewis, Edward T; Edwards, Whitney
2013-11-14
Diabetes is one of the leading causes of illness and death for African Americans and people of African descent throughout the United States and in the city and county of Sacramento, California. The involvement of families and communities in developing prevention strategies can increase the likelihood that behavioral changes will be sustained. Three member organizations of the African American Leadership Coalition (AALC) entered into a partnership with the University of California, Davis (UC Davis) to engage families in developing a process to identify barriers to diabetes and obesity prevention and reduction, exchange strategies, and create action plans for prevention. The intervention comprised 3 phases: 1) coalition formation and training; 2) data collection, analysis, and dissemination of results; and 3) development of family and community action plans. Academic and community partners planned and implemented all project phases together. Sources of information about diabetes and obesity were primarily doctors and the Internet; barriers were related to lack of time needed to prepare healthy meals, high food costs, transportation to fresh markets, motivation around healthy habits, and unsafe environments. Action plans addressed behavioral change and family cohesion. The group discussion format encouraged mutual support and suggestions for better eating and physical exercise habits. This collaborative partnership model can strengthen existing group relationships or promote new affiliations that form the basis for future action coalitions. Participants worked both within and across groups to exchange information, stories of success and challenges, and specific health improvement strategies.
FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2010
2010-01-01
The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…
The Building Wellness project: a case history of partnership, power sharing, and compromise.
Jones, Drew; Franklin, Charla; Butler, Brittany T; Williams, Pluscedia; Wells, Kenneth B; Rodríguez, Michael A
2006-01-01
The Institute of Medicine has recommended development of community-focused strategies to alleviate the disproportionate burden of illness on minorities, including depression. So far, limited data exist on the process of developing such partnerships within diverse racial/ethnic environments as they strive to develop community-driven, evidence-based action plans to improve the quality of outreach services. We describe such an effort around depression in south Los Angeles and explore the issues of the process in the hopes of informing future partnership development. Community meetings, presentations, feedback, discussion groups, and consensus-based action items were implemented over an 18-month period. A writing subcommittee was designated to develop a description of the group's work and process, as well as the diverse perspectives in the partnership. Data sources included meeting minutes, materials for members and community feedback presentations, scribe notes, and the reflections of the authors. Development was seen on the formal group level, in the process, and on the realization of three categories of action plans. Designed to assist social service caseworkers in the recognition of and referral for depression, the action plans included developing a website, a tool kit (modified Delphi process), and a one-page depression "fact sheet" with region-specific referrals. Through the process of developing a means to combat depression in a racially/ ethnically diverse population, the community is not only better informed about depression but has become a true partner with the academic element in adapting these programs for local service providers, resulting in improved understanding of the partnership process.
HiTEC: a connectionist model of the interaction between perception and action planning.
Haazebroek, Pascal; Raffone, Antonino; Hommel, Bernhard
2017-11-01
Increasing evidence suggests that perception and action planning do not represent separable stages of a unidirectional processing sequence, but rather emerging properties of highly interactive processes. To capture these characteristics of the human cognitive system, we have developed a connectionist model of the interaction between perception and action planning: HiTEC, based on the Theory of Event Coding (Hommel et al. in Behav Brain Sci 24:849-937, 2001). The model is characterized by representations at multiple levels and by shared representations and processes. It complements available models of stimulus-response translation by providing a rationale for (1) how situation-specific meanings of motor actions emerge, (2) how and why some aspects of stimulus-response translation occur automatically and (3) how task demands modulate sensorimotor processing. The model is demonstrated to provide a unitary account and simulation of a number of key findings with multiple experimental paradigms on the interaction between perception and action such as the Simon effect, its inversion (Hommel in Psychol Res 55:270-279, 1993), and action-effect learning.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 705.502 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopsis of Proposed Contract Actions 705.502 Authority. (a) The M... USAID contracting officers to place paid advertisements and notices in newspapers and periodicals...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 705.502 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopsis of Proposed Contract Actions 705.502 Authority. (a) The M... USAID contracting officers to place paid advertisements and notices in newspapers and periodicals...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Purpose of this Strategic Petroleum Reserve (SPR) Plan Amendment is to provide a Distribution Plan, setting forth the method of drawdown and distribution of the Reserve. Chapter VII of the SPR Plan contained a Distribution Plan which identified and discussed the major objectives, criteria and other factors that will be considered in developing the detailed plan. This Amendment replaces Chapter VII of the SPR Plan in its entirety.
America's Children & the Information Superhighway: A Briefing Book and National Action Agenda.
ERIC Educational Resources Information Center
Children's Partnership, Santa Monica, CA.
A study was conducted to determine how the information highway affects today's children and to develop a set of national children's goals and an action plan for achieving them. The study's methodology included a review of relevant child development and telecommunications literature, identification of model programs, analysis of experiences with…
ERIC Educational Resources Information Center
Boucher, Daryl
2013-01-01
This action research project examined how "Efficiency in Learning" ("EL") strategies, "Appreciative Inquiry" ("AI") and the "Interactive Model of Program Planning" ("IMPP") could be used to discern the content and preferred pedagogical approaches in the development of a pre-licensure…
Affirmative action as organization development at the Johnson Space Center
NASA Technical Reports Server (NTRS)
Tryman, Mfanya Donald L.
1987-01-01
The role of affirmative actions is investigated as an interventionist Organization Development (OD) strategy for insuring equal opportunities at the NASA/Johnson Space Center. In doing so, an eclectic and holistic model is developed for the recruiting and hiring of minorities and females over the next five years. The strategy, approach, and assumptions for the model are quite different than those for JSC's five year plan. The study concludes that Organization development utilizing affirmative action is a valid means to bring about organizational change and renewal processes, and that an eclectic model of affirmative action is most suitable and rational in obtaining this end.
No Free Lunch: A Condensed Strategic Planning Process
ERIC Educational Resources Information Center
Kohrmann, Patrick C., II
2008-01-01
Most people picture "strategic planning" as endless meetings spent doing SWOT (strengths, weaknesses, opportunities, and threats) analyses, crafting vision and mission statements, and developing goals and action plans. Few look forward to the experience or reflect back on it with pleasure. In this article, the author describes how he…
75 FR 82066 - Change in Discount Rate for Water Resources Planning
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-29
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a...
78 FR 16706 - Change in Discount Rate for Water Resources Planning
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-18
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a...
The Food-Safe Schools Action Guide
ERIC Educational Resources Information Center
Centers for Disease Control and Prevention, 2007
2007-01-01
"The Food-Safe School Needs Assessment and Planning Guide" is a tool that can help schools assess their food safety policies, procedures, and programs and develop plans for improvement. This tool includes a simple, straightforward questionnaire, score card, and planning guide that give administrators, school staff, families, and students a chance…
77 FR 59963 - Preliminary Plan for Distribution of Judgment Funds to the Loyal Mdewakantons
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-01
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Preliminary Plan for Distribution of Judgment Funds to the Loyal Mdewakantons AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice of hearings and request for comments. SUMMARY: The Department of the Interior is developing a plan for...
77 FR 57637 - Shipping Coordinating Committee; Notice of Committee Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-18
... --Report of the Secretary-General on credentials --Strategy, planning and reform --Resource management... --Recommendations of the External Auditor: implementation action plan --Report on arrears of contributions and of... considerations for 2012 and 2013 --Development of a long-term plan for the future financial sustainability of the...
76 FR 73674 - Change in Discount Rate for Water Resources Planning
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-29
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a...
75 FR 8106 - Change in Discount Rate for Water Resources Planning
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-23
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a...
Beyond SMART? A New Framework for Goal Setting
ERIC Educational Resources Information Center
Day, Trevor; Tosey, Paul
2011-01-01
This article extends currently reported theory and practice in the use of learning goals or targets with students in secondary and further education. Goal-setting and action-planning constructs are employed in personal development plans (PDPs) and personal learning plans (PLPs) and are advocated as practice within the English national policy…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childs, Allen B.
This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Yearmore » Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.« less
29 CFR 1910.38 - Emergency action plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... action plan must include at a minimum: (1) Procedures for reporting a fire or other emergency; (2... 29 Labor 5 2013-07-01 2013-07-01 false Emergency action plans. 1910.38 Section 1910.38 Labor... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action plans...
Aging Action: A Course in Senior Advocacy in Kansas.
ERIC Educational Resources Information Center
Kansas State Advisory Council on Aging, Topeka.
Skills useful in advocacy of senior citizens' needs are discussed in this manual. The topics included are: (1) the meaning of advocacy; (2) assertiveness training for aging-action; (3) identifying issues; (4) choosing issues; (5) developing a plan of action; (6) organizing; (7) legislative advocacy; (8) criteria to evaluate potential legislative…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
... Materials Safety Administration (PHMSA), DOT. ACTION: Advisory notice. SUMMARY: PHMSA and the Federal... compliance date in a future rulemaking action. This notice is intended to provide the widest dissemination of our planned future action to all potentially affected parties and to allow for development of a...
A Guide to Facilitating Action Research for Youth
ERIC Educational Resources Information Center
Goldwasser, Matthew
2004-01-01
What is "action research" and how is it relevant to urban youth activists? Action research is a systematic process of inquiry, which involves gathering information about an issue or problem, analyzing the findings, and developing practical plans for affecting positive change. It is motivated by the desire to investigate in order to better…
Personality Traits and Training Initiation Process: Intention, Planning, and Action Initiation
Laguna, Mariola; Purc, Ewelina
2016-01-01
The article aims at investigating the role of personality traits in relation to training initiation. Training initiation is conceptualized as a goal realization process, and explained using goal theories. There are three stages of the process analyzed: intention to undertake training, plan formulation, and actual training undertaking. Two studies tested the relationships between five personality traits, defined according to the five factor model, and the stages of the goal realization process. In Study 1, which explains training intention and training plans’ formulation, 155 employees participated. In Study 2, which was time-lagged with two measurement points, and which explains intention, plans, and training actions undertaken, the data from 176 employees was collected at 3 month intervals. The results of these studies show that personality traits, mainly openness to experience, predict the training initiation process to some degree: intention, plans, and actual action initiation. The findings allow us to provide recommendations for practitioners responsible for human resource development. The assessment of openness to experience in employees helps predict their motivation to participate in training activities. To increase training motivation it is vital to strengthen intentions to undertake training, and to encourage training action planning. PMID:27909414
Ordinance No. 87-015, Economic and Social Development Plan of Niger, 1987-1991, 30 April 1987.
1987-01-01
This document contains major provisions of the Economic and Social Development Plan of Niger (1987-91) and Niger's 1987 Ordinance No. 87-16 containing the National Charter. The development plan notes the problems attendant upon Niger's population growth and calls for voluntary, not coercive, measures to manage population growth. A program of action is outlined that involves a reduction in mortality and morbidity, an emphasis on family planning programs, demographic research and education, and provision of population information. The reprinted portions of Niger's National Charter define national unity; call for improvement in the status and education of women; and guarantee freedom of movement and of residence as well as the right to education and to health. Specific actions sought include making basic education obligatory, improving literacy, protecting health by increasing life expectancy and improving quality of life, protecting the family, protecting the handicapped and the aged, and providing sex education for young people. The foundation of the population policy of Niger will be to improve living conditions and the health of the people. Efforts will be made to allow women to master the appropriate technologies to lighten the burden of their domestic work and free them for training activities. Specific actions are delineated to protect agricultural resources, reduce desertification, improve housing conditions, and address urbanization.
NASA Astrophysics Data System (ADS)
Wang, S. Y.; Ho, C. C.; Chang, L. C.
2017-12-01
The public use water in Hsinchu are mainly supplied from Baoshan Reservoir, Second Baoshan Reservoir, Yongheshan Reservoir and Longen Weir. However, the increasing water demand, caused by development of the Hsinchu Science and Industrial Park, results in supply stable water getting more difficult. For stabilize water supply in Hsinchu, the study applies long-term and short-term plans to fulfill the water shortage. Developing an efficient methodology to define a cost-effective action portfolio is an important task. Hence, the study develops a novel decision model, the Stochastic Programming with Recourse Decision Model (SPRDM), to estimate a cost-effective action portfolio. The first-stage of SPRDM determine the long-term action portfolio and the portfolio accompany recourse information (the probability for water shortage event). The second-stage of SPRDM optimize the cost-effective action portfolio in response to the recourse information. In order to consider the uncertainty of reservoir sediment and demand growth, the study set 9 scenarios comprise optimistic, most likely, and pessimistic reservoir sediment and demand growth. The results show the optimal action portfolio consist of FengTain Lake and Panlon Weir, Hsinchu Desalination Plant, Domestic and Industrial Water long-term plans, and Emergency Backup Well, Irrigation Water Transference, Preliminary Water Rationing, Advanced Water Rationing and Water Transport from Other Districts short-term plans. The minimum expected cost of optimal action portfolio is NT$1.1002 billion. The results can be used as a reference for decision making because the results have considered the uncertainty of varied hydrology, reservoir sediment, and water demand growth.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
Corrective Action Unit (CAU) 371 is located in Areas 11 and 18 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 371 is comprised of the two corrective action sites (CASs) listed below: • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate correctivemore » action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 19, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 371. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 371 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Measure in situ external dose rates using thermoluminescent dosimeters or other dose measurement devices. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates. • Combine internal and external dose rates to determine whether total dose rates exceed final action levels (FALs). • Collect and submit environmental samples for laboratory analysis to determine whether chemical contaminants are present at concentrations exceeding FALs. • If contamination exceeds FALs, define the extent of the contamination exceeding FALs. • Investigate waste to determine whether potential source material is present. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy; and U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less
National cancer plans: the French experience.
Khayat, David
2013-01-01
With a prediction of about 20 million cases and 10 million deaths occurring to 2020, cancer is becoming one of the most important challenges in the field of human health. National Cancer Control plans are effective tools to set up actions that, by their specificity in regard to the local epidemiology and resources, can break the rising curve of human toll that we are paying to this disease. In this article we present the French experience with the National Cancer Plans. We point out the most significant actions that were developed in the areas of prevention, screening, care, access to innovative treatments, and research.
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
Rural applications of advanced traveler information systems : recommended actions
DOT National Transportation Integrated Search
1997-07-01
The Recommended Action Plan is one in a series of interim documents for the Rural Applications of Advanced Traveler Information Systems (ATIS) project. Based on the investigation of user needs, a technology review, and concept development and assessm...
Texas motorcycle crash countermeasure workshop.
DOT National Transportation Integrated Search
2013-06-01
The Texas Department of Transportation (TxDOT) contracted with the Texas A&M : Transportation Institute (TTI) to develop a 5-year strategic plan for improving motorcycle safety : in the State of Texas. The Texas Strategic Action Plan for Motorcycl...
Draft of the Martin Peña Initative Plan
This action plan is being developed so that EPA Region 2 can implement a strategy that focuses its programs and regulatory authorities in activities that comprehensively address the environmental issues affecting the Martin Pena communities.
Barry Hultquist, Teresa; Brown, Sara Goomis; Geske, Jenenne; Kaiser, Katherine Laux; Waibel-Rycek, Denise
2015-11-01
Health care practitioners support or hinder an individual's attempts to self-manage health behavior. Practitioners must understand an individual's health needs and goals to effectively partner for behavior change. Self-management support (SMS) promote efforts toward positive health behavior change. Practitioners need training to provide effective SMS, beginning with their formal education. The purpose of this educational practice project was to integrate an evidence-based intervention (SMS using action plans) into a nursing curriculum. Three sequential steps included (1) providing foundational SMS education, (2) SMS application with students' personal action plans, and (3) implementing SMS with community-dwelling individuals with diabetes. Students (n = 130) partnered with participants (n = 85), developing short- (n = 240) and long-term (n = 99) action plans during home visits. The average baseline Diabetes Empowerment Scale score measuring participant's perceived psychosocial diabetes management self-efficacy was 4.3 (1-5 scale, SD = 0.51, n = 83). Most common short-term actions related to physical activity (n = 100, 42%) and healthy eating (n = 61, 25%). Average participant confidence level was 7.7 (SD = 1.9, 0-10 scale). Short-term goal evaluation (n = 209) revealed 66% (n = 137) were met more than 50% of the time. Both participants (99%) and students (99%) expressed satisfaction with home visit and action plan experiences. This teaching-learning experience is replicable and applicable to any professional health care student. © 2015 Society for Public Health Education.
49 CFR 234.11 - State highway-rail grade crossing action plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false State highway-rail grade crossing action plans..., STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway...
49 CFR 234.11 - State highway-rail grade crossing action plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false State highway-rail grade crossing action plans..., STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway...
49 CFR 234.11 - State highway-rail grade crossing action plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false State highway-rail grade crossing action plans..., STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway...
NASA Astrophysics Data System (ADS)
Jiang, Xujia; Hong, Chaopeng; Zheng, Yixuan; Zheng, Bo; Guan, Dabo; Gouldson, Andy; Zhang, Qiang; He, Kebin
2015-10-01
Following a series of extreme air pollution events, the Chinese government released the Air Pollution Prevention and Control Action Plan in 2013 (China’s State Council 2013). The Action Plan sets clear goals for key regions (i.e. cities above the prefecture level, Beijing-Tianjin-Hebei Province, the Yangtze River Delta and the Pearl River Delta) and establishes near-term control efforts for the next five years. However, the extent to which the Action Plan can direct local governments’ activities on air pollution control remains unknown. Here we seek to evaluate the air quality improvement and associated health benefits achievable under the Action Plan in the Pearl River Delta (PRD) area from 2012 to 2017. Measure-by-measure quantification results show that the Action Plan would promise effective emissions reductions of 34% of SO2, 28% of NOx, 26% of PM2.5 (particulate matter less than 2.5 μm in diameter), and 10% of VOCs (volatile organic compounds). These emissions abatements would lower the PM2.5 concentration by 17%, surpassing the 15% target established in the Action Plan, thereby avoiding more than 2900 deaths and 4300 hospital admissions annually. We expect the implementation of the Action Plan in the PRD would be productive; the anticipated impacts, however, fall short of the goal of protecting the health of local residents, as there are still more than 33 million people living in places where the annual mean ambient PM2.5 concentrations are greater than 35 μg m-3, the interim target-3 of the World Health Organization (WHO). We therefore propose the next steps for air pollution control that are important not only for the PRD but also for all other regions of China as they develop and implement effective air pollution control policies.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-05
... and stakeholders. C. Eligibility Information The following organizations/institutions are eligible to...] Cooperative Agreement With the World Health Organization for a Plan to Develop a Global Integrated Food Safety Information Platform AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY: The Food and Drug...
Manpower Planning for Wastewater Treatment Plants.
ERIC Educational Resources Information Center
Davies, J. Kenneth; And Others
This document discusses the components necessary in the development of a forecasting process by which manpower needs can be determined and the development of action programs by which the projected needs may be satisfied. The primary focus of this manual is directed at that person in a state agency who has the responsibility for planning the…
Drug Abuse Assessment, Program Planning and Resource Development in the Black Community.
ERIC Educational Resources Information Center
Gunn, Karen S.
This paper presents a needs assessment project developed to establish drug-related services in a small black community. A literature review reveals the influence of social issues relevant to the population on research methodology, program planning, and social action. The convergent analysis approach used in the needs assessment is explained and…
Guldbrandsson, Karin; Wennerstad, Karin Modig; Rasmussen, Finn
2009-08-03
Promoting physical activity and healthy eating habits by structural measures that reach most children in a society is presumably the most sustainable way of preventing development of overweight and obesity in childhood. The main purpose of the present study was to analyse whether policies and plans of action at the central level in municipalities increased the number of measures that aim to promote physical activity and healthy eating habits among schoolchildren aged six to 16. Another purpose was to analyse whether demographic and socio-economic characteristics were associated with the level of such measures. Questionnaires were used to collect data from 25 municipalities and 18 town districts in Stockholm County, Sweden. The questions were developed to capture municipal structural work and factors facilitating physical activity and the development of healthy eating habits for children. Local policy documents and plans of action were gathered. Information regarding municipal demographic and socio-economic characteristics was collected from public statistics. Policy documents and plans of action in municipalities and town districts did not seem to influence the number of measures aiming to promote physical activity and healthy eating habits among schoolchildren in Stockholm County. Municipal demographic and socio-economic characteristics were, however, shown to influence the number of measures. In town districts with a high total population size, and in municipalities and town districts with a high proportion of adults with more than 12 years of education, a higher level of health-promoting measures was found. In municipalities with a high annual population growth, the number of measures was lower than in municipalities with a lower annual population growth. Another key finding was the lack of agreement between what was reported in the questionnaires regarding existence and contents of local policies and plans of action and what was actually found when these documents were scrutinized. Policy documents and plans of action aiming to promote physical activity and healthy eating habits among schoolchildren aged six to 16 in municipalities and town districts in Stockholm County did not seem to have an impact on the local level of measures. Demographic and socio-economic characteristics of the municipalities and town districts were on the other hand associated with local health-promoting measures.
Charting a path to efficiencies following a merger.
Klar, Brandon; Shufelt, Gregory P
2015-06-01
Health systems can access the full range of opportunities for enhanced efficiencies following a merger or an acquisition by pursuing the following five-step process, which constitutes the development of a business plan of operational efficiencies: Secure executive sponsorship and involvement. Establish an integration steering committee. Develop guiding principles. Identify and validate potential efficiencies. Develop an action plan for each department and function.
FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2012
2012-01-01
The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…
FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2011
2011-01-01
The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…
High Skills, High Wages. Washington's Comprehensive Plan for Workforce Training and Education.
ERIC Educational Resources Information Center
Washington State Workforce Training and Education Coordinating Board, Olympia.
This document is the 1996 update to a 1994 Comprehensive Plan for Workforce Training and Education in Washington State. The plan focuses on collective actions that public and private sector partners need to take to have the best work force development system in the nation. The plan details how jobs are increasingly demanding higher-level skills,…
FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2006
2006-01-01
The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…
ERIC Educational Resources Information Center
Mueller, Tracy Gershwin; Bassett, Diane S.; Brewer, Robin D.
2012-01-01
The Individuals with Disabilities Education Act (IDEA) mandates the implementation of a behavior intervention plan based on a functional behavioral assessment when a student's behavior necessitates disciplinary actions. However, IDEA does not provide any clear guidelines as to what the plans should contain nor how they can address behaviors that…
DOE Office of Scientific and Technical Information (OSTI.GOV)
ITLV
This CAIP presents a plan to investigate the DTRSA where unregulated disposal of radioactive and possibly hazardous waste occurred during decontamination activities for the Double Tracks test. The purpose of the corrective action investigation described in this CAIP is to: Identify and verify the locations of the decontamination facility and animal burial pit within the DTRSA; Identify the presence and nature of COPCs; Determine the vertical and lateral extent of COPCs; and Provide sufficient information and data to develop and evaluate appropriate corrective actions for the CAS. This CAIP was developed using the U.S. Environmental Protection Agency (EPA) Data Qualitymore » Objectives (DQOs) (EPA, 1994d) process to clearly define the goals for collecting environmental data, to determine data uses, and to design a data collection program that will satisfy these uses. A DQO scoping meeting was held prior to preparation of this plan; a brief summary of the DQOs is presented in Section 3.4. A more detailed summary of the DQO process and results is included in Appendix A.« less
29 CFR 1608.7 - Affirmative action plans or programs under State or local law.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 4 2011-07-01 2011-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action plans...
29 CFR 1608.7 - Affirmative action plans or programs under State or local law.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 4 2010-07-01 2010-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action plans...
Affirmative Action Plan, October 1987 through September 1988
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-10-01
This report documents Reynolds Electrical and Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations.
Asthma education: different viewpoints elicited by qualitative and quantitative methods.
Damon, Scott A; Tardif, Richard R
2015-04-01
This project began as a qualitative examination of how asthma education provided by health professionals could be improved. Unexpected qualitative findings regarding the use of Asthma Action Plans and the importance of insurance reimbursement for asthma education prompted further quantitative examination. Qualitative individual interviews were conducted with primary care physicians in private practice who routinely provide initial diagnoses of asthma and focus groups were conducted with other clinicians in private primary care practices who routinely provide asthma education. Using the DocStyles quantitative tool two questions regarding Asthma Action Plans and insurance reimbursement were asked of a representative sample of physicians and other clinicians. The utility of Asthma Action Plans was questioned in the 2012 qualitative study. Qualitative findings also raised questions regarding whether reimbursement is the barrier to asthma education for patients performed by medical professionals it is thought to be. 2013 quantitative findings show that the majority of clinicians see Asthma Action Plans as useful. The question of whether reimbursement is a barrier to providing asthma education to patients was not resolved by the quantitative data. The majority of clinicians see Asthma Action Plans as a useful tool for patient education. Clinicians had less clear opinions on whether the lack of defined reimbursement codes acted as a barrier to asthma education. The study also provided useful audience data for design of new asthma educational tools developed by CDC.
Floyd, R Louise; Johnson, Kay A; Owens, Jasmine R; Verbiest, Sarah; Moore, Cynthia A; Boyle, Coleen
2013-10-01
Preconception health and health care (PCHHC) has gained increasing popularity as a key prevention strategy for improving outcomes for women and infants, both domestically and internationally. The Action Plan for the National Initiative on Preconception Health and Health Care: A Report of the PCHHC Steering Committee (2012-2014) provides a model that states, communities, public, and private organizations can use to help guide strategic planning for promoting preconception care projects. Since 2005, a national public-private PCHHC initiative has worked to create and implement recommendations on this topic. Leadership and funding from the Centers for Disease Control and Prevention combined with the commitment of maternal and child health leaders across the country brought together key partners from the public and private sector to provide expertise and technical assistance to develop an updated national action plan for the PCHHC Initiative. Key activities for this process included the identification of goals, objectives, strategies, actions, and anticipated timelines for the five workgroups that were established as part of the original PCHHC Initiative. These are further described in the action plan. To assist other groups doing similar work, this article discusses the approach members of the PCHHC Initiative took to convene local, state, and national leaders to enhance the implementation of preconception care nationally through accomplishments, lessons learned, and projections for future directions.
Integrating Climate Change into Habitat Conservation Plans Under the U.S. Endangered Species Act
NASA Astrophysics Data System (ADS)
Bernazzani, Paola; Bradley, Bethany A.; Opperman, Jeffrey J.
2012-06-01
Habitat Conservation Plans (HCPs) under the Endangered Species Act (ESA) are an important mechanism for the acquisition of land and the management of terrestrial and aquatic ecosystems. HCPs have become a vital means of protecting endangered and threatened species and their habitats throughout the United States, particularly on private land. The scientific consensus that climate is changing and that these changes will impact the viability of species has not been incorporated into the conservation strategies of recent HCPs, rendering plans vulnerable biologically. In this paper we review the regulatory context for incorporating climate change into HCPs and analyze the extent to which climate change is linked to management actions in a subset of large HCPs. We conclude that most current plans do not incorporate climate change into conservation actions, and so we provide recommendations for integrating climate change into the process of HCP development and implementation. These recommendations are distilled from the published literature as well as the practice of conservation planning and are structured to the specific needs of HCP development and implementation. We offer nine recommendations for integrating climate change into the HCP process: (1) identify species at-risk from climate change, (2) explore new strategies for reserve design, (3) increase emphasis on corridors, linkages, and connectivity, (4) develop anticipatory adaptation measures, (5) manage for diversity, (6) consider assisted migration, (7) include climate change in scenarios of water management, (8) develop future-oriented management actions, and (9) increase linkages between the conservation strategy and adaptive management/monitoring programs.
Integrating climate change into habitat conservation plans under the U.S. endangered species act.
Bernazzani, Paola; Bradley, Bethany A; Opperman, Jeffrey J
2012-06-01
Habitat Conservation Plans (HCPs) under the Endangered Species Act (ESA) are an important mechanism for the acquisition of land and the management of terrestrial and aquatic ecosystems. HCPs have become a vital means of protecting endangered and threatened species and their habitats throughout the United States, particularly on private land. The scientific consensus that climate is changing and that these changes will impact the viability of species has not been incorporated into the conservation strategies of recent HCPs, rendering plans vulnerable biologically. In this paper we review the regulatory context for incorporating climate change into HCPs and analyze the extent to which climate change is linked to management actions in a subset of large HCPs. We conclude that most current plans do not incorporate climate change into conservation actions, and so we provide recommendations for integrating climate change into the process of HCP development and implementation. These recommendations are distilled from the published literature as well as the practice of conservation planning and are structured to the specific needs of HCP development and implementation. We offer nine recommendations for integrating climate change into the HCP process: (1) identify species at-risk from climate change, (2) explore new strategies for reserve design, (3) increase emphasis on corridors, linkages, and connectivity, (4) develop anticipatory adaptation measures, (5) manage for diversity, (6) consider assisted migration, (7) include climate change in scenarios of water management, (8) develop future-oriented management actions, and (9) increase linkages between the conservation strategy and adaptive management/monitoring programs.
23 CFR 450.224 - Phase-in of new requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... may be developed using the TEA-21 requirements or the provisions and requirements of this part. (b) For STIPs that are developed under TEA-21 requirements prior to July 1, 2007, the FHWA/FTA action (i.e... plans that are completed under TEA-21 requirements prior to July 1, 2007, the State adoption action must...
Human Health Risk Assessment Strategic Research Action Plan 2012-2016
This document outlines the strategic plan for EPA’s Human Health Risk Assessment research efforts, and how they support and are integrated into the overall research portfolio of the Agency’s Office of Research and Development.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... Research and Development Program 2013 Annual Plan AGENCY: Office of Fossil Energy, Department of Energy. ACTION: Notice of report availability. SUMMARY: The Office of Fossil Energy announces the availability of...-plan or in print form (see ``Contact'' below). The 2013 Annual Plan is in compliance with the Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-31
... it would not wait for systemic problems to undermine transmission planning before action is taken... that the development of transmission facilities can involve long lead times and complex problems... rather than allowing the problems in transmission planning and cost allocation to continue or to increase...
45 CFR 1355.35 - Program improvement plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... developed jointly by title IV-E agency and Federal staff in consultation with the review team; (ii) Identify... how the action steps in the plan build on and make progress over prior program improvement plans; (vii... evaluated jointly by the title IV-E agency and ACF, in collaboration with other members of the review team...
Interpretation and Manipulation in Human Plans.
ERIC Educational Resources Information Center
Newman, Denis; Bruce, Bertram C.
1986-01-01
Uses an analysis of children's interpretations of a complex episode of social interaction to illustrate three features that distinguish them from robot plans and that form a basis for a theory of the development of social action: human plans (1) are social, (2) operate on interpretations, and (3) are used, not just executed. (FL)
ERIC Educational Resources Information Center
Romero, David T., Ed.
The San Bernardino Valley College (California) Strategic Enrollment Management (SEM) Plan was developed to specifically increase student enrollment and to improve retention over 2000-2002, and thereafter. Presents the SEM plan in two parts: recruitment and retention. The date, description, action, person responsible, date needed, date completed,…
Hafertepe, E C
1987-01-01
The Sisters of Charity Health Care System (SCHCS), Inc., Cincinnati, undertook a systemwide board evaluation project to support and enhance effective aspects of governance and to deal with obstacles that often arise due to differing beliefs and role confusion. A task force of chief executive officers developed the questionnaire, which was then administered to members of individual facilities' boards and the system's board. The documented highlighted value issues important to SCHCS's ministry and business activities: overall board responsibilities, financial responsibilities, strategic planning, the board's role, committee structures, the board's operating process, board education, and overall board effectiveness. The responses from each member were returned to the local boards, who analyzed them and developed an action plan. A summary of each facility's responses and action plans were forwarded to the system's corporate office. The CEO committee critiqued the process and reported on significant issues and action plans. In general, survey results revealed a strong influence of mission and philosophy in decision making, support for current processes, and effective interaction among board members. The system's corporate office will use the responses to respond to a dynamic environment and strengthen their role in the delivery of Catholic health care services.
Initiating an Action Research Programme for University EFL Teachers: Early Experiences and Responses
ERIC Educational Resources Information Center
Burns, Anne; Westmacott, Anne; Ferrer, Antonieta Hidalgo
2016-01-01
Accounts of how teacher educators begin to plan, develop, and support action research programmes for language teachers are rare, as are descriptions of the responses of the teachers who participate. This article documents and analyses the initial processes of introducing and supporting a new programme of action research for language teachers at…
Engaging Chicago residents in climate change action: Results from Rapid Ethnographic Inquiry
Lynne M. Westphal; Jennifer Hirsch
2010-01-01
Addressing climate change requires action at all levels of society, from neighborhood to international levels. Using Rapid Ethnography rooted in Asset Based Community Development theory, we investigated climate-friendly attitudes and behaviors in two Chicago neighborhoods in order to assist the City with implementation of its Climate Action Plan. Our research suggests...
Pilot-scale treatability test plan for the 200-BP-5 operable unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less
Cattarino, Lorenzo; Hermoso, Virgilio; Carwardine, Josie; Kennard, Mark J.; Linke, Simon
2015-01-01
Planning for the remediation of multiple threats is crucial to ensure the long term persistence of biodiversity. Limited conservation budgets require prioritizing which management actions to implement and where. Systematic conservation planning traditionally assumes that all the threats in priority sites are abated (fixed prioritization approach). However, abating only the threats affecting the species of conservation concerns may be more cost-effective. This requires prioritizing individual actions independently within the same site (independent prioritization approach), which has received limited attention so far. We developed an action prioritization algorithm that prioritizes multiple alternative actions within the same site. We used simulated annealing to find the combination of actions that remediate threats to species at the minimum cost. Our algorithm also accounts for the importance of selecting actions in sites connected through the river network (i.e., connectivity). We applied our algorithm to prioritize actions to address threats to freshwater fish species in the Mitchell River catchment, northern Australia. We compared how the efficiency of the independent and fixed prioritization approach varied as the importance of connectivity increased. Our independent prioritization approach delivered more efficient solutions than the fixed prioritization approach, particularly when the importance of achieving connectivity was high. By spatially prioritizing the specific actions necessary to remediate the threats affecting the target species, our approach can aid cost-effective habitat restoration and land-use planning. It is also particularly suited to solving resource allocation problems, where consideration of spatial design is important, such as prioritizing conservation efforts for highly mobile species, species facing climate change-driven range shifts, or minimizing the risk of threats spreading across different realms. PMID:26020794
Cattarino, Lorenzo; Hermoso, Virgilio; Carwardine, Josie; Kennard, Mark J; Linke, Simon
2015-01-01
Planning for the remediation of multiple threats is crucial to ensure the long term persistence of biodiversity. Limited conservation budgets require prioritizing which management actions to implement and where. Systematic conservation planning traditionally assumes that all the threats in priority sites are abated (fixed prioritization approach). However, abating only the threats affecting the species of conservation concerns may be more cost-effective. This requires prioritizing individual actions independently within the same site (independent prioritization approach), which has received limited attention so far. We developed an action prioritization algorithm that prioritizes multiple alternative actions within the same site. We used simulated annealing to find the combination of actions that remediate threats to species at the minimum cost. Our algorithm also accounts for the importance of selecting actions in sites connected through the river network (i.e., connectivity). We applied our algorithm to prioritize actions to address threats to freshwater fish species in the Mitchell River catchment, northern Australia. We compared how the efficiency of the independent and fixed prioritization approach varied as the importance of connectivity increased. Our independent prioritization approach delivered more efficient solutions than the fixed prioritization approach, particularly when the importance of achieving connectivity was high. By spatially prioritizing the specific actions necessary to remediate the threats affecting the target species, our approach can aid cost-effective habitat restoration and land-use planning. It is also particularly suited to solving resource allocation problems, where consideration of spatial design is important, such as prioritizing conservation efforts for highly mobile species, species facing climate change-driven range shifts, or minimizing the risk of threats spreading across different realms.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mobrand, Lars Erik; Lestelle, Lawrence C.
In the spring of 1994 a technical planning support project was initiated by the Grande Ronde Model Watershed Board of Directors (Board) with funding from the Bonneville Power Administration. The project was motivated by a need for a science based method for prioritizing restoration actions in the basin that would promote effectiveness and accountability. In this section the authors recall the premises for the project. The authors also present a set of recommendations for implementing a watershed planning process that incorporates a science-based framework to help guide decision making. This process is intended to assist the Grande Ronde Model Watershedmore » Board in its effort to plan and implement watershed improvement measures. The process would also assist the Board in coordinating its efforts with other entities in the region. The planning process is based on an approach for developing an ecosystem management strategy referred to as the Ecosystem Diagnosis and Treatment (EDT) method (Lichatowich et al. 1995, Lestelle et al. 1996). The process consists of an on-going planning cycle. Included in this cycle is an assessment of the ability of the watershed to support and sustain natural resources and other economic and societal values. This step in the process, which the authors refer to as the diagnosis, helps guide the development of actions (also referred to as treatments) aimed at improving the conditions of the watershed to achieve long-term objectives. The planning cycle calls for routinely reviewing and updating, as necessary, the basis for the diagnosis and other analyses used by the Board in adopting actions for implementation. The recommendations offered here address this critical need to habitually update the information used in setting priorities for action.« less
Settlement Networks in Polish Spatial Development Regional Plans
NASA Astrophysics Data System (ADS)
Sołtys, Jacek
2017-10-01
In 1999, ten years after the great political changes in Poland, 16 self-governed regions (in Polish: voivodeship) were created. According to Polish law, voivodeship spatial development plans, or regional plans in short, determine basic elements of the settlement network. No detailed regulations indicate the specific elements of the settlement network or what features of these elements should be determined. For this reason, centres as elements of the settlement network are variously named in different regions and take the form of various models. The purposes of the research described in this article are: (1) recognition and systematization of settlement network models determined in regional plans; and (2) assessment of the readability of determination in planning and its usefulness in the practice of regional policy. Six models of settlement networks in regional plans have been identified and classified into types and sub-types. Names of specific levels of centres indicate that they were classified according to two criteria: (1) level of services, which concerns only 5 voivodships; and (2) importance in development, which concerns the 11 other voivodships. The hierarchical model referring to the importance of development is less understandable than the one related to services. In the text of most plans, centres of services and centres of development are treated independently from their names. In some plans the functional types of towns and cities are indicated. In some voivodships, specifications in the plan text are too general and seem to be rather useless in the practice of regional policy. The author suggests that regional plans should determine two kinds of centres: hierarchical service centres and non-hierarchical centres of development. These centres should be further distinguished according to: (1) their role in the activation of surroundings; (2) their level of development and the necessity of action for their development; and (3) the types of actions indicated in the regional policy.
Djandji, Fabienne; Lamontagne, Alexandrine J; Blais, Lucie; Bacon, Simon L; Ernst, Pierre; Grad, Roland; Lavoie, Kim L; McKinney, Martha L; Desplats, Eve; Ducharme, Francine M
2017-03-31
Despite national recommendations, most patients with asthma are not given a written action plan . The objectives were to ascertain physicians' endorsement of potential enablers to providing a written action plan, and the determinants and proportion, of physician-reported use of a written action plan. We surveyed 838 family physicians, paediatricians, and emergency physicians in Quebec. The mailed questionnaire comprised 102 questions on asthma management, 11 of which pertained to written action plan and promising enablers. Physicians also selected a case vignette that best corresponded to their practice and reported their management. The survey was completed by 421 (56%) physicians (250 family physicians, 115 paediatricians and 56 emergency physicians); 43 (5.2%) reported providing a written action plan to ≥70% of their asthmatic patients and 126 (30%) would have used a written action plan in the selected vignette. Most (>60%) physicians highly endorsed the following enablers: patients requesting a written action plan, adding a blank written action plan to the chart, receiving a copy of the written action plan completed by a consultant, receiving a monetary compensation for its completion, and having another healthcare professional explain the completed written action plan to patients. Four determinants were significantly associated with providing a written action plan: being a paediatrician (RR:2.1), treating a child (RR:2.0), aiming for long-term asthma control (RR:2.5), and being aware of national recommendations to provide a written action plan to asthmatic patients (RR:2.9). A small minority of Quebec physicians reported providing a written action plan to most of their patients, revealing a huge care gap. Several enablers to improve uptake, highly endorsed by physicians, should be prioritised in future implementation efforts. ENCOURAGING DOCTORS TO PROVIDE WRITTEN ACTION PLANS: Changes to practice organization and doctors' perceptions should encourage the provision of written action plans for all asthma patients. International guidelines state that effective long-term treatment of asthma requires educated self-management, regular reviews and provision of a written action plan (WAP). However, many patients have poor asthma control and as few as 30 per cent have a WAP. Fabienne Djandji at the Saint-Justine University Central Hospital in Montreal, Canada, and co-workers conducted a survey of 421 doctors to determine their attitudes and provision of WAPs. Only 5.2 per cent of respondents provided WAPs to patients; those treating children or aiming for long-term asthma control were more likely to do so. The doctors said that incentives to provide WAPs would include requests from patients themselves, being paid to complete WAPs and having extra support from specialists or other health care professionals such as pharmacists.
Antimicrobial resistance in South East Asia: time to ask the right questions.
Kakkar, Manish; Chatterjee, Pranab; Chauhan, Abhimanyu Singh; Grace, Delia; Lindahl, Johanna; Beeche, Arlyne; Jing, Fang; Chotinan, Suwit
2018-01-01
Antimicrobial resistance (AMR) has emerged as a major public health concern, around which the international leadership has come together to form strategic partnerships and action plans. The main driving force behind the emergence of AMR is selection pressure created due to consumption of antibiotics. Consumption of antibiotics in human as well as animal sectors are driven by a complex interplay of determinants, many of which are typical to the local settings. Several sensitive and essential realities are tied with antibiotic consumption - food security, livelihoods, poverty alleviation, healthcare access and national economies, to name a few. That makes one-size-fits-all policies, framed with the developed country context in mind, inappropriate for developing countries. Many countries in the South East Asian Region have some policy structures in place to deal with AMR, but most of them lack detailed implementation plans or monitoring structures. In this current debates piece, the authors argue that the principles driving the AMR agenda in the South East Asian countries need to be dealt with using locally relevant policy structures. Strategies, which have successfully reduced the burden of AMR in the developed countries, should be evaluated in the developing country contexts instead of ad hoc implementation. The Global Action Plan on AMR encourages member states to develop locally relevant National Action Plans on AMR. This policy position should be leveraged to develop and deploy locally relevant strategies, which are based on a situation analysis of the local systems, and are likely to meet the needs of the individual member states.
Styne, Dennis; Askia, Joyce; Roberts, Tina; Lewis, Edward T.; Edwards, Whitney
2013-01-01
Background Diabetes is one of the leading causes of illness and death for African Americans and people of African descent throughout the United States and in the city and county of Sacramento, California. The involvement of families and communities in developing prevention strategies can increase the likelihood that behavioral changes will be sustained. Context Three member organizations of the African American Leadership Coalition (AALC) entered into a partnership with the University of California, Davis (UC Davis) to engage families in developing a process to identify barriers to diabetes and obesity prevention and reduction, exchange strategies, and create action plans for prevention. Methods The intervention comprised 3 phases: 1) coalition formation and training; 2) data collection, analysis, and dissemination of results; and 3) development of family and community action plans. Academic and community partners planned and implemented all project phases together. Outcomes Sources of information about diabetes and obesity were primarily doctors and the Internet; barriers were related to lack of time needed to prepare healthy meals, high food costs, transportation to fresh markets, motivation around healthy habits, and unsafe environments. Action plans addressed behavioral change and family cohesion. The group discussion format encouraged mutual support and suggestions for better eating and physical exercise habits. Interpretation This collaborative partnership model can strengthen existing group relationships or promote new affiliations that form the basis for future action coalitions. Participants worked both within and across groups to exchange information, stories of success and challenges, and specific health improvement strategies. PMID:24229570
Interference due to shared features between action plans is influenced by working memory span.
Fournier, Lisa R; Behmer, Lawrence P; Stubblefield, Alexandra M
2014-12-01
In this study, we examined the interactions between the action plans that we hold in memory and the actions that we carry out, asking whether the interference due to shared features between action plans is due to selection demands imposed on working memory. Individuals with low and high working memory spans learned arbitrary motor actions in response to two different visual events (A and B), presented in a serial order. They planned a response to the first event (A) and while maintaining this action plan in memory they then executed a speeded response to the second event (B). Afterward, they executed the action plan for the first event (A) maintained in memory. Speeded responses to the second event (B) were delayed when it shared an action feature (feature overlap) with the first event (A), relative to when it did not (no feature overlap). The size of the feature-overlap delay was greater for low-span than for high-span participants. This indicates that interference due to overlapping action plans is greater when fewer working memory resources are available, suggesting that this interference is due to selection demands imposed on working memory. Thus, working memory plays an important role in managing current and upcoming action plans, at least for newly learned tasks. Also, managing multiple action plans is compromised in individuals who have low versus high working memory spans.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert Boehlecke
2004-04-01
The six bunkers included in CAU 204 were primarily used to monitor atmospheric testing or store munitions. The ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada'' (NNSA/NV, 2002a) provides information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for each CAS within CAU 204. The evaluation of corrective action alternatives is based on process knowledge and the results of investigative activitiesmore » conducted in accordance with the CAIP (NNSA/NV, 2002a) that was approved prior to the start of the Corrective Action Investigation (CAI). Record of Technical Change (ROTC) No. 1 to the CAIP (approval pending) documents changes to the preliminary action levels (PALs) agreed to by the Nevada Division of Environmental Protection (NDEP) and DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This ROTC specifically discusses the radiological PALs and their application to the findings of the CAU 204 corrective action investigation. The scope of this CADD consists of the following: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of corrective action alternatives in relation to corrective action objectives and screening criteria; and (5) Recommend and justify a preferred corrective action alternative for each CAS within CAU 204.« less
29 CFR 1910.38 - Emergency action plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Means of Egress § 1910.38 Emergency action plans. (a) Application. An... plans. An emergency action plan must be in writing, kept in the workplace, and available to employees... information about the plan or an explanation of their duties under the plan. (d) Employee alarm system. An...
ERIC Educational Resources Information Center
de Gonzalez, Carmen Beatriz; Hernandez, Teresa; Kusch, Jim; Ryan, Charly
2004-01-01
Planning contains so much more than the written plan. Early in 2000, an invitation came from the Collaborative Action Research Network (CARN), to people experienced in action research who might want to help plan and present an action research event for elementary school science teachers in Venezuela, South America, in Autumn 2000. This article…
43 CFR 34.8 - Affirmative action plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Affirmative action plans. 34.8 Section 34..., applicants or recipients shall have an acceptable affirmative action plan which has been approved by the... paragraph (c) of this section. The affirmative action plan must set forth overall goals and timetables for...
Salt Storage Fact Sheet QUICK LINKS 2015-2019 Strategic Action Plan 2010-2014 Strategic Action Plan 2006 Strategic Action Plan OWRC Bylaws For More Information Brian Hall OWRC - State Agency Coordinating Program (Indirect Discharge) Primary Headwater Habitat Streams Remedial Action Plans (RAP) River Mile Maps
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
Controlling Attention through Action: Observing Actions Primes Action-Related Stimulus Dimensions
ERIC Educational Resources Information Center
Fagioli, Sabrina; Ferlazzo, Fabio; Hommel, Bernhard
2007-01-01
Previous findings suggest that planning an action "backward-primes" perceptual dimension related to this action: planning a grasp facilitates the processing of visual size information, while planning a reach facilitates the processing of location information. Here we show that dimensional priming of perception through action occurs even in the…
Meet EPA Scientist Sherri Hunt, Ph.D.
Dr. Sherri Hunt is the Assistant Center Director for the Air, Climate, and Energy (ACE) Research Program. She plays an active leadership role in the ACE program planning and coordination and was a key author for the Research Action Plan development
Demographic Planning: An Action Approach
ERIC Educational Resources Information Center
Finch, Harold L.; Smith, Joyce
1974-01-01
Community colleges are in a good position to obtain reliable long-term forecasts of future demand. An approach developed at Johnson County Community College in Overland Park, Kansas, has enabled the college to assist other community institutions in their parallel planning efforts. (Author/MLF)
Writing a group practice business plan.
Reiboldt, J M
1999-07-01
A business plan offers group practices a blueprint to accomplish a variety of goals, such as securing capital, marketing the practice's services, recruiting new employees, developing a strategic plan or a budget, or planning for growth. A business plan should be informative, specific, and visionary. Elements that every business plan should address are a mission statement, strategy, planning, management information, and action scheme. A business plan should include certain information in a prescribed order. By writing a realistic business plan, group practices can work more efficiently and minimize the risk of not meeting their financial projections.
ERIC Educational Resources Information Center
Van Ongevalle, Jan; Huyse, Huib; Van Petegem, Peter
2013-01-01
This article reports on the results of an action research project (2010-13) in which ten Belgian organizations who implement development education programmes explored different planning, monitoring, and evaluation (PME) approaches with the aim of learning more effectively about their results. PME approaches piloted included outcome mapping, most…
ERIC Educational Resources Information Center
Joyner, Edward T., Ed.; Ben-Avie, Michael, Ed.; Comer, James P., Ed.
2004-01-01
For more than 35 years, the Yale School Development Program (SDP) has been pioneering the Comer Process for planned change in schools. From initial planning and preparation, through foundation building, transformation, institutionalization, and renewal, the Comer Process provides school leaders with a comprehensive and effective framework for…
ERIC Educational Resources Information Center
MCGRAW, EUGENE T.
PART OF A KANSAS STATE UNIVERSITY SERIES ON COMMUNITY PLANNING AND DEVELOPMENT, THIS MONOGRAPH DESCRIBES AND DEFINES THE NATURE OF URBAN CENTERS AS PHYSICAL ENTITIES. BASIC LAND USE CATEGORIES AND SUBDIVISIONS, FUNCTIONAL CLASSIFICATIONS OF COMMUNITIES IN THE UNITED STATES (MANUFACTURING, RETAIL, WHOLESALE, DIVERSIFIED, TRANSPORTATION, MINING,…
77 FR 44214 - Essential Fish Habitat Components of Fishery Management Plans; 5-Year Review
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
... herring, skates, Atlantic salmon, and Atlantic deep- sea red crab. The Council is seeking comments about removing the range of alternatives pertaining to deep-sea corals from this action and developing them as a... effects on deep-sea corals developed under the authority granted in the fishery management plan (FMP...
The scaup conservation action plan: working toward coherence
Austin, Jane E.
2010-01-01
The last in a series of three workshops to develop a decision framework for the scaup conservation action plan was conducted in September 2009. Fifteen waterfowl biologists and managers met in Memphis, Tennessee at the Ducks Unlimited Headquarters to review and refine the decision statement, objectives, and prototype model for the continental scaup population, with a special focus on vital rate parameters that are affected during migration and winter. In a significant step toward coherence, the participants also developed models for incorporating human dimensions – hunters – into the decision framework, and to link the population of diving duck hunters with the continental scaup population.
Commonwealth of the Northern Mariana Islands Energy Action Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conrad, M. D.; Ness, J. E.
2013-07-01
This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.
Natural Resource Management Plan for Brookhaven National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
green, T.
This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by themore » Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).« less
NASA Technical Reports Server (NTRS)
Smith, David E.; Jonsson, Ari K.; Clancy, Daniel (Technical Monitor)
2001-01-01
In recent years, Graphplan style reachability analysis and mutual exclusion reasoning have been used in many high performance planning systems. While numerous refinements and extensions have been developed, the basic plan graph structure and reasoning mechanisms used in these systems are tied to the very simple STRIPS model of action. In 1999, Smith and Weld generalized the Graphplan methods for reachability and mutex reasoning to allow actions to have differing durations. However, the representation of actions still has some severe limitations that prevent the use of these techniques for many real-world planning systems. In this paper, we 1) separate the logic of reachability from the particular representation and inference methods used in Graphplan, and 2) extend the notions of reachability and mutual exclusion to more general notions of time and action. As it turns out, the general rules for mutual exclusion reasoning take on a remarkably clean and simple form. However, practical instantiations of them turn out to be messy, and require that we make representation and reasoning choices.
Integrating planning and reactive control
NASA Technical Reports Server (NTRS)
Wilkins, David E.; Myers, Karen L.
1994-01-01
Our research is developing persistent agents that can achieve complex tasks in dynamic and uncertain environments. We refer to such agents as taskable, reactive agents. An agent of this type requires a number of capabilities. The ability to execute complex tasks necessitates the use of strategic plans for accomplishing tasks; hence, the agent must be able to synthesize new plans at run time. The dynamic nature of the environment requires that the agent be able to deal with unpredictable changes in its world. As such, agents must be able to react to unanticipated events by taking appropriate actions in a timely manner, while continuing activities that support current goals. The unpredictability of the world could lead to failure of plans generated for individual tasks. Agents must have the ability to recover from failures by adapting their activities to the new situation, or replanning if the world changes sufficiently. Finally, the agent should be able to perform in the face of uncertainty. The Cypress system, described here, provides a framework for creating taskable, reactive agents. Several features distinguish our approach: (1) the generation and execution of complex plans with parallel actions; (2) the integration of goal-driven and event driven activities during execution; (3) the use of evidential reasoning for dealing with uncertainty; and (4) the use of replanning to handle run-time execution problems. Our model for a taskable, reactive agent has two main intelligent components, an executor and a planner. The two components share a library of possible actions that the system can take. The library encompasses a full range of action representations, including plans, planning operators, and executable procedures such as predefined standard operating procedures (SOP's). These three classes of actions span multiple levels of abstraction.
Integrating planning and reactive control
NASA Astrophysics Data System (ADS)
Wilkins, David E.; Myers, Karen L.
1994-10-01
Our research is developing persistent agents that can achieve complex tasks in dynamic and uncertain environments. We refer to such agents as taskable, reactive agents. An agent of this type requires a number of capabilities. The ability to execute complex tasks necessitates the use of strategic plans for accomplishing tasks; hence, the agent must be able to synthesize new plans at run time. The dynamic nature of the environment requires that the agent be able to deal with unpredictable changes in its world. As such, agents must be able to react to unanticipated events by taking appropriate actions in a timely manner, while continuing activities that support current goals. The unpredictability of the world could lead to failure of plans generated for individual tasks. Agents must have the ability to recover from failures by adapting their activities to the new situation, or replanning if the world changes sufficiently. Finally, the agent should be able to perform in the face of uncertainty. The Cypress system, described here, provides a framework for creating taskable, reactive agents. Several features distinguish our approach: (1) the generation and execution of complex plans with parallel actions; (2) the integration of goal-driven and event driven activities during execution; (3) the use of evidential reasoning for dealing with uncertainty; and (4) the use of replanning to handle run-time execution problems. Our model for a taskable, reactive agent has two main intelligent components, an executor and a planner. The two components share a library of possible actions that the system can take. The library encompasses a full range of action representations, including plans, planning operators, and executable procedures such as predefined standard operating procedures (SOP's). These three classes of actions span multiple levels of abstraction.
FY 95 engineering work plan for the design reconstitution implementation action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bigbee, J.D.
Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less
78 FR 23740 - Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-22
...] Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan AGENCY: Animal and... proposed action plan describing a potential new approach to managing swine brucellosis and pseudorabies...-0086) a notice that made a proposed action plan describing a potential new approach to managing swine...
29 CFR 1910.38 - Emergency action plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 5 2011-07-01 2011-07-01 false Emergency action plans. 1910.38 Section 1910.38 Labor... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Means of Egress § 1910.38 Emergency action plans. (a) Application. An employer must have an emergency action plan whenever an OSHA standard in this part requires one. The...
Incremental planning to control a blackboard-based problem solver
NASA Technical Reports Server (NTRS)
Durfee, E. H.; Lesser, V. R.
1987-01-01
To control problem solving activity, a planner must resolve uncertainty about which specific long-term goals (solutions) to pursue and about which sequences of actions will best achieve those goals. A planner is described that abstracts the problem solving state to recognize possible competing and compatible solutions and to roughly predict the importance and expense of developing these solutions. With this information, the planner plans sequences of problem solving activities that most efficiently resolve its uncertainty about which of the possible solutions to work toward. The planner only details actions for the near future because the results of these actions will influence how (and whether) a plan should be pursued. As problem solving proceeds, the planner adds new details to the plan incrementally, and monitors and repairs the plan to insure it achieves its goals whenever possible. Through experiments, researchers illustrate how these new mechanisms significantly improve problem solving decisions and reduce overall computation. They briefly discuss current research directions, including how these mechanisms can improve a problem solver's real-time response and can enhance cooperation in a distributed problem solving network.
NASA Technical Reports Server (NTRS)
Wang, Charles C.; Peng, Ted; Sue, Miles K.
2004-01-01
In the 23'd Annual SFCG meeting in San Diego, CA, the SFCG created SFCG Action Item No. 23/10 to provide a readable summary of the work done by the Mars Interim Working Group (MIWG). The SFCG created the MIWG to develop a frequency plan for future Mars missions. The working group has produced a number of documents resulting in a recommendation, SFCG Rec 22-1 [1], titled Frequency Assignment Guidelines for Communications in Mars Region, including a frequency plan for the Mars Region. This document is prepared in response to the SFCG Action Item to provide an overview of the considerations taken when selecting the frequencies and to point out where detailed information of the considerations can be found.
ERIC Educational Resources Information Center
Kathi, Pradeep Chandra
2012-01-01
The School of Planning Policy and Development at the University of Southern California brought together representatives of neighborhood councils and city agencies of the city of Los Angeles together in an action research program. This action research program called the Collaborative Learning Project developed a collaboration process called the…
ERIC Educational Resources Information Center
Van Der Voort, Geoffrey; Wood, Lesley
2014-01-01
This article reports on a first cycle of a larger action research study conducted to determine how Circuit Teams could support School Management Teams of underperforming high schools towards whole-school development. Although it is a mandated requirement by the Department of Education, none of the four schools involved in the study had developed a…
ERIC Educational Resources Information Center
Markic, Silvija; Eilks, Ingo
2006-01-01
This paper discusses a project of Participatory Action Research (PAR) on lower secondary chemistry education. In this ongoing project, practicing teachers and university researchers in chemical education jointly carry out projects for developing and evaluating new lesson plans. The focus of the PAR group is to develop teaching/learning activities…
Ecological Assessment and Planning in the Wildland-Urban Interface: A Landscape Perspective
Wayne C. Zipperer
2005-01-01
The day starts like any other with one exception, a request to evaluate the effects of a proposed residential development in your management districts. Development has occured in adjacent districts, but not in yours. You realize that the proposal represents more than just one action, it represents the first of a series of actions that can alter ther ecological...
Developing a National Tiger Action Plan for the Union of Myanmar
NASA Astrophysics Data System (ADS)
Lynam, Antony J.; Khaing, Saw Tun; Zaw, Khin Maung
2006-01-01
A century ago, tigers were considered pests in Myanmar. Hunters claimed thousands, yet populations persisted. In the past century, because of habitat loss and prey depletion, coupled with the recent demand for traditional medicines, tiger populations have been reduced to a few hundred individuals. As a first step toward long-term planning for tigers, and to guide efforts to increase protected area coverage, the Myanmar government in 1998 initiated a project to develop a revised National Tiger Action Plan. Extensive surveys confirmed tigers in only 4 of 17 survey locations. Significant populations are thought to persist in the far North and far South of the country, where large, intact forests offer the potential for tiger recovery. With partnerships and collaborations, tiger populations can be protected in the short term (<5 years) by expanding protected areas and corridors, mobilizing enforcement staff to reduce poaching of tigers and prey, and amending existing wildlife legislation in accordance with international laws. Over the long term (5-20 years), recovery of Myanmar’s tiger populations will depend on increasing support from local people, zoning tiger areas to reduce habitat loss and disturbance, and maintaining connectivity of existing national and transboundary forests. This article reviews the development of a new National Tiger Action Plan for the Union of Myanmar and discusses a blueprint for conservation measures aimed at saving tigers from extinction.
Developing a national tiger action plan for The Union of Myanmar.
Lynam, Antony J; Khaing, Saw Tun; Zaw, Khin Maung
2006-01-01
A century ago, tigers were considered pests in Myanmar. Hunters claimed thousands, yet populations persisted. In the past century, because of habitat loss and prey depletion, coupled with the recent demand for traditional medicines, tiger populations have been reduced to a few hundred individuals. As a first step toward long-term planning for tigers, and to guide efforts to increase protected area coverage, the Myanmar government in 1998 initiated a project to develop a revised National Tiger Action Plan. Extensive surveys confirmed tigers in only 4 of 17 survey locations. Significant populations are thought to persist in the far North and far South of the country, where large, intact forests offer the potential for tiger recovery. With partnerships and collaborations, tiger populations can be protected in the short term (<5 years) by expanding protected areas and corridors, mobilizing enforcement staff to reduce poaching of tigers and prey, and amending existing wildlife legislation in accordance with international laws. Over the long term (5-20 years), recovery of Myanmar's tiger populations will depend on increasing support from local people, zoning tiger areas to reduce habitat loss and disturbance, and maintaining connectivity of existing national and transboundary forests. This article reviews the development of a new National Tiger Action Plan for the Union of Myanmar and discusses a blueprint for conservation measures aimed at saving tigers from extinction.
A Working Plan for Treating the Engineering Faculty Shortage Problem.
ERIC Educational Resources Information Center
Shoup, Terry E., Ed.
In view of the consequences of the engineering faculty shortage problem on engineering capabilities in the future in the United States, a working plan which will serve as a national agenda for prompt action has been developed. This plan involves the three key groups (federal government, academic community, industry) who have the vision,…
ERIC Educational Resources Information Center
Pensacola Junior Coll., FL. Office of Institutional Research and Effectiveness.
Prepared in response to a Florida legislative mandate requiring the development and implementation of institutional accountability goals, this report presents the goals adopted by Pensacola Junior College (PJC), the college's plan of action, and data on progress made as of 1992-93 on the goals. Following an introduction, the first part presents…
ERIC Educational Resources Information Center
Huber, Elaine
2017-01-01
Scholarly evaluation practices in learning and teaching projects are under-reported in the literature. In order for robust evaluative measures to be implemented, a project requires a well-designed evaluation plan. This research study describes the development of a practical evaluation planning framework through an action research approach, using…
Strategies for Action: An Outline of Factors Which Influence Decisions on Program Plans.
ERIC Educational Resources Information Center
Bogue, E. G.
This paper discusses strategies which can help the admissions officer/registrar be more effective in having his program plans transformed into reality. The program planning process is considered from three prospectives beginning with a brief discussion of the current state of program development in higher education. It is conjectured that the…
School Health Index: A Self-Assessment and Planning Guide. Middle School/High School.
ERIC Educational Resources Information Center
Barrios, Lisa C.; Burgeson, Charlene R.; Crossett, Linda; Harrykissoon, Samantha D.; Pritzl, Jane; Wechsler, Howell; Kuester, Sarah A.; Pederson, Linda; Graffunder, Corinne; Rainford, Neil; Sleet, David
2004-01-01
The "School Health Index" is a self-assessment and planning guide that will enable schools to: (1) identify the strengths and weaknesses of school policies and programs for promoting health and safety; (2) develop an action plan for improving student health and safety, and (3) involve teachers, parents, students, and the community in improving…
ERIC Educational Resources Information Center
Magnen, Andre
In many developing countries, the translation of political objectives to action projects is made difficult by the lack of training of staff of the ministry of education planning and managing units. This booklet deals with the implementation of these projects within the framework of the planning process. After defining projects, chapter 1 shows the…
Developing Employee Assistance Programs: New Roles for School Psychologists.
ERIC Educational Resources Information Center
Allie, Stephen M.
In the spring of 1988 an independent school district in Texas formed a 30-member strategic planning team which gathered data on factors impacting the school district at that time and into the foreseeable future. Planning was facilitated by the appointment of 15 action teams formed to write specific plans to fulfill various targets and strategies.…
ERIC Educational Resources Information Center
Araujo-Soares, Vera; McIntyre, Teresa; Sniehotta, Falko F.
2009-01-01
This paper aims to test the direct predictors of the theory of planned behaviour (TPB), action planning and coping planning as predictors of changes in physical activity (PA) in 157 adolescents (mean age: 12). TPB measures, the Action Planning and Coping Planning Scales (APCPS) and the International Physical Activity Questionnaires were measured…
ERIC Educational Resources Information Center
Frings, A.; And Others
This handbook is intended to help trainers and development workers plan and conduct training programs based on the Action Training Model (ATM). The ATM combines training with action and learning with production by building upon participants' knowledge and learning needs and involving participants in a process of active learning and cooperative…
DOT National Transportation Integrated Search
2000-07-01
The motor carrier administration has developed an overall strategy for improving the safety of commercial motor vehicles (trucks and buses). This strategy, called the Safety Action Plan, covers the years 2000 through 2003 and contains 47 initiatives ...
Haregu, Tilahun Nigatu; Setswe, Geoffrey; Elliott, Julian; Oldenburg, Brian
2014-01-01
Introduction: Although there are several models of integrated architecture, we still lack models and theories about the integration process of health system responses to HIV/AIDS and NCDs. Objective: The overall purpose of this study is to design an action model, a systematic approach, for the integration of health system responses to HIV/AIDS and NCDs in developing countries. Methods: An iterative and progressive approach of model development using inductive qualitative evidence synthesis techniques was applied. As evidence about integration is spread across different fields, synthesis of evidence from a broad range of disciplines was conducted. Results: An action model of integration having 5 underlying principles, 4 action fields, and a 9-step action cycle is developed. The INTEGRATE model is an acronym of the 9 steps of the integration process: 1) Interrelate the magnitude and distribution of the problems, 2) Navigate the linkage between the problems, 3) Testify individual level co-occurrence of the problems, 4) Examine the similarities and understand the differences between the response functions, 5) Glance over the health system’s environment for integration, 6) Repackage and share evidence in a useable form, 7) Ascertain the plan for integration, 8) Translate the plan in to action, 9) Evaluate and Monitor the integration. Conclusion: Our model provides a basis for integration of health system responses to HIV/AIDS and NCDs in the context of developing countries. We propose that future empirical work is needed to refine the validity and applicability of the model. PMID:24373260
Using Correlation to Compute Better Probability Estimates in Plan Graphs
NASA Technical Reports Server (NTRS)
Bryce, Daniel; Smith, David E.
2006-01-01
Plan graphs are commonly used in planning to help compute heuristic "distance" estimates between states and goals. A few authors have also attempted to use plan graphs in probabilistic planning to compute estimates of the probability that propositions can be achieved and actions can be performed. This is done by propagating probability information forward through the plan graph from the initial conditions through each possible action to the action effects, and hence to the propositions at the next layer of the plan graph. The problem with these calculations is that they make very strong independence assumptions - in particular, they usually assume that the preconditions for each action are independent of each other. This can lead to gross overestimates in probability when the plans for those preconditions interfere with each other. It can also lead to gross underestimates of probability when there is synergy between the plans for two or more preconditions. In this paper we introduce a notion of the binary correlation between two propositions and actions within a plan graph, show how to propagate this information within a plan graph, and show how this improves probability estimates for planning. This notion of correlation can be thought of as a continuous generalization of the notion of mutual exclusion (mutex) often used in plan graphs. At one extreme (correlation=0) two propositions or actions are completely mutex. With correlation = 1, two propositions or actions are independent, and with correlation > 1, two propositions or actions are synergistic. Intermediate values can and do occur indicating different degrees to which propositions and action interfere or are synergistic. We compare this approach with another recent approach by Bryce that computes probability estimates using Monte Carlo simulation of possible worlds in plan graphs.
77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-05
... Project water conservation best management practices that shall ``develop criteria for evaluating the... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The...
77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-22
... Central Valley Project water conservation best management practices that shall ``develop criteria for... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
Code of Federal Regulations, 2010 CFR
2010-07-01
....13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park and... community development and urban revitalization efforts; (2) The degree to which park and recreation plans...
The purpose of this document is to provide guidance to the EPA Regions for developing Institutional Control Implementation and Assurance Plans (ICIAPs) at contaminated sites where the response action includes an institutional controls (ICs) component.
Biodiversity conservation in local planning.
Miller, James R; Groom, Martha; Hess, George R; Steelman, Toddi; Stokes, David L; Thompson, Jan; Bowman, Troy; Fricke, Laura; King, Brandon; Marquardt, Ryan
2009-02-01
Local land-use policy is increasingly being recognized as fundamental to biodiversity conservation in the United States. Many planners and conservation scientists have called for broader use of planning and regulatory tools to support the conservation of biodiversity at local scales. Yet little is known about the pervasiveness of these practices. We conducted an on-line survey of county, municipal, and tribal planning directors (n =116) in 3 geographic regions of the United States: metropolitan Seattle, Washington; metropolitan Des Moines, Iowa; and the Research Triangle, North Carolina. Our objectives were to gauge the extent to which local planning departments address biodiversity conservation and to identify factors that facilitate or hinder conservation actions in local planning. We found that biodiversity conservation was seldom a major consideration in these departments. Staff time was mainly devoted to development mandates and little time was spent on biodiversity conservation. Regulations requiring conservation actions that might benefit biodiversity were uncommon, with the exception of rules governing water quality in all 3 regions and the protection of threatened and endangered species in the Seattle region. Planning tools that could enhance habitat conservation were used infrequently. Collaboration across jurisdictions was widespread, but rarely focused on conservation. Departments with a conservation specialist on staff tended to be associated with higher levels of conservation actions. Jurisdictions in the Seattle region also reported higher levels of conservation action, largely driven by state and federal mandates. Increased funding was most frequently cited as a factor that would facilitate greater consideration of biodiversity in local planning. There are numerous opportunities for conservation biologists to play a role in improving conservation planning at local scales.
Adaptive management: a paradigm for remediation of public facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Janecky, David R; Whicker, Jeffrey J; Doerr, Ted B
2009-01-01
Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far moremore » complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.« less
The role of action planning and plan enactment for smoking cessation
2013-01-01
Background Several studies have reemphasized the role of action planning. Yet, little attention has been paid to the role of plan enactment. This study assesses the determinants and the effects of action planning and plan enactment on smoking cessation. Methods One thousand and five participants completed questionnaires at baseline and at follow-ups after one and six months. Factors queried were part of the I-Change model. Descriptive analyses were used to assess which plans were enacted the most. Multivariate linear regression analyses were used to assess whether the intention to quit smoking predicted action planning and plan enactment, and to assess which factors would predict quitting behavior. Subsequently, both multivariate and univariate regression analyses were used to assess which particular action plans would be most effective in predicting quitting behavior. Similar analyses were performed among a subsample of smokers prepared to quit within one month. Results Smokers who intended to quit smoking within the next month had higher levels of action planning than those intending to quit within a year. Additional predictors of action planning were being older, being female, having relatively low levels of cigarette dependence, perceiving more positive and negative consequences of quitting, and having high self-efficacy toward quitting. Plan enactment was predicted by baseline intention to quit and levels of action planning. Regression analysis revealed that smoking cessation after six months was predicted by low levels of depression, having a non-smoking partner, the intention to quit within the next month, and plan enactment. Only 29% of the smokers who executed relatively few plans had quit smoking versus 59% of the smokers who executed many plans. The most effective preparatory plans for smoking cessation were removing all tobacco products from the house and choosing a specific date to quit. Conclusion Making preparatory plans to quit smoking is important because it also predicts plan enactment, which is predictive of smoking cessation. Not all action plans were found to be predictive of smoking cessation. The effects of planning were not very much different between the total sample and smokers prepared to quit within one month. PMID:23622256
The patient reporting and action for a safe environment (PRASE) intervention: a feasibility study.
O'Hara, Jane K; Lawton, Rebecca J; Armitage, Gerry; Sheard, Laura; Marsh, Claire; Cocks, Kim; McEachan, Rosie R C; Reynolds, Caroline; Watt, Ian; Wright, John
2016-11-28
There is growing interest in the role of patients in improving patient safety. One such role is providing feedback on the safety of their care. Here we describe the development and feasibility testing of an intervention that collects patient feedback on patient safety, brings together staff to consider this feedback and to plan improvement strategies. We address two research questions: i) to explore the feasibility of the process of systematically collecting feedback from patients about the safety of care as part of the PRASE intervention; and, ii) to explore the feasibility and acceptability of the PRASE intervention for staff, and to understand more about how staff use the patient feedback for service improvement. We conducted a feasibility study using a wait-list controlled design across six wards within an acute teaching hospital. Intervention wards were asked to participate in two cycles of the PRASE (Patient Reporting & Action for a Safe Environment) intervention across a six-month period. Participants were patients on participating wards. To explore the acceptability of the intervention for staff, observations of action planning meetings, interviews with a lead person for the intervention on each ward and recorded researcher reflections were analysed thematically and synthesised. Recruitment of patients using computer tablets at their bedside was straightforward, with the majority of patients willing and able to provide feedback. Randomisation of the intervention was acceptable to staff, with no evidence of differential response rates between intervention and control groups. In general, ward staff were positive about the use of patient feedback for service improvement and were able to use the feedback as a basis for action planning, although engagement with the process was variable. Gathering a multidisciplinary team together for action planning was found to be challenging, and implementing action plans was sometimes hindered by the need to co-ordinate action across multiple services. The PRASE intervention was found to be acceptable to staff and patients. However, before proceeding to a full cluster randomised controlled trial, the intervention requires adaptation to account for the difficulties in implementing action plans within three months, the need for a facilitator to support the action planning meetings, and the provision of training and senior management support for participating ward teams. The PRASE intervention represents a promising method for the systematic collection of patient feedback about the safety of hospital care.
[Design of a plan for patient safety in pediatric surgery service].
Paredes Esteban, R M; Castillo Fernández, A L; Miñarro del Moral, R; Garrido Pérez, J I; Granero Cendón, R; Gómez Beltrán, O; Berenguer Garcia, M J; Tejedor Fernández, M
2014-10-01
Patient safety is a key priority in quality management for healthcare services providers. Every patient is entitled to receive safe and effective healthcare. The aim of this study was to design a patient safety plan for a Paediatric Surgery Department. We carried out a literature review and we established a work group that included healthcare professionals from the Paediatric Surgery Department and the Quality and Medical Records Department. The group identified potential adverse events, failures and causes and established a rating using Failure Mode Effects Analysis. Potential risks were mapped out and a plan was designed establishing actions to reduce risks. We designated leaders to ensure the effective implementation of the plan. A total of 58 adverse events were identified in the Paediatric Surgery Department. We detected 128 failures that were produced by 211 different causes. The group developed a proposal with 424 specific measures to carry out preventive and/or remedial actions that were then narrowed down to 322. The group designed a plan to apply the programme, which is currently being implemented. The methodology used enabled obtaining key information for improvement of patient safety and developing preventive and/or remedial actions. These measures are applicable in practice, as they were designed using proposals and agreements with professionals that take active part in the care of children with surgical conditions.
Report of the Tape Recorder Action Plan Committee, 21 March 1972
NASA Technical Reports Server (NTRS)
1972-01-01
A NASA/AF Tape Recorder Action Plan Committee was formed in January 1972 to investigate tape recorder problems and to recommend an action plan to NASA management. The committee collected data on tape recorder failure history, pinpointed problem areas, discussed needed technical and management changes, and proposed an action plan for the recommended approaches.
ERIC Educational Resources Information Center
Ramírez, Elena; Clemente, María; Recamán, Adriana; Martín-Domínguez, Jorge; Rodríguez, Inés
2017-01-01
Planning is one of the professional tasks teachers have to carry out before their direct action in the classrooms. This planning is closely interrelated to the way teachers teach. The question about how and why teachers reach their decisions in their pre-class planning is a classical one in the research into curricular design and development. The…
Application of science-based restoration planning to a desert river system.
Laub, Brian G; Jimenez, Justin; Budy, Phaedra
2015-06-01
Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.
Application of Science-Based Restoration Planning to a Desert River System
NASA Astrophysics Data System (ADS)
Laub, Brian G.; Jimenez, Justin; Budy, Phaedra
2015-06-01
Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.
Application of science-based restoration planning to a desert river system
Laub, Brian G.; Jimenez, Justin; Budy, Phaedra
2015-01-01
Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.
ERIC Educational Resources Information Center
Information Dynamics Corp., Reading, MA.
A study intended to provide the Defense Documentation Center (DDC) with a five-year plan for the development of improved and new microfiche products, services, and production capabilities is summarized in this report. In addition, the major findings, conclusions, and recommendations developed during the study are noted. The results of the research…
The eco-origins, actions and demonstration roles of Beijing Green Olympic Game.
Wang, R S
2001-10-01
The 29th Olympic Game will be held in Beijing in 2008. It will be a green game to promote sustainable development of men, cities and regions through ecological development advocating "man and nature be in one". "Eco" here means a process, a driving force, an action, a culture and a kind of vitality leading to sustainable development. It is a mechanism embodying the Olympic spirit of competition, cooperation and self-reliance. The paper explained the ecological significance, connotation and objectives of Beijing Green Olympic Game. Ten major ecological heritages of Beijing have been investigated including ecologically sound landscape, culture, transportation, physical exercise, health care, sanitation, food, family relationship, agriculture, and human ecological totality. To preserve or restore the above mentioned old tradition, a green Olympic action plan has been made out in Beijing initiated by NGOs, supported by entrepreneurs and coordinated by government agencies. Four kinds of eco-engineering have been planned for blue sky, clean water, green land and eco-city development. The demonstration role of Beijing Green Olympic Game to developing regions and countries is also discussed.
NASA Astrophysics Data System (ADS)
Arunima, Dasgupta; Dhinwa, P. S.; Rajawat, A. S.
2015-02-01
The world's drylands are subject to desertification as a result of extended droughts, climate change, and human activities. Development in drylands depends on addressing degradation of the ecosystem, mainstreaming sustainable natural resources management, and building upon the existing adaptive capacities of communities and institutions. In this regard, recent scientific results aimed to promote sustainable development through action plans for combating desertification. In India, under the Integrated Mission for Sustainable Development (IMSD) programme, remote sensing based integrated land and water resource studies were carried out with an objective to generate locale specific action plans for sustainable development of a region. A specific study was carried out, in districts of Jhabua and Dhar, in Madhya Pradesh using Composite Land Development Sites (CLDS) approach for forest and wasteland development and soil and water conservation. Various treatments were suggested and implemented in 1995. The present study was carried out with an objective to monitor the positive impacts of combating plan implementation through visual interpretation and NDVI analysis of temporal images of LISS III data, since 1991 to 2013. The study reveals that there is substantial increase in the area of irrigated agricultural land with increase in number of check dams along with the stream channels.
Setting Priorities for Regional Conservation Planning in the Mediterranean Sea
Micheli, Fiorenza; Levin, Noam; Giakoumi, Sylvaine; Katsanevakis, Stelios; Abdulla, Ameer; Coll, Marta; Fraschetti, Simonetta; Kark, Salit; Koutsoubas, Drosos; Mackelworth, Peter; Maiorano, Luigi; Possingham, Hugh P.
2013-01-01
Spatial prioritization in conservation is required to direct limited resources to where actions are most urgently needed and most likely to produce effective conservation outcomes. In an effort to advance the protection of a highly threatened hotspot of marine biodiversity, the Mediterranean Sea, multiple spatial conservation plans have been developed in recent years. Here, we review and integrate these different plans with the goal of identifying priority conservation areas that represent the current consensus among the different initiatives. A review of six existing and twelve proposed conservation initiatives highlights gaps in conservation and management planning, particularly within the southern and eastern regions of the Mediterranean and for offshore and deep sea habitats. The eighteen initiatives vary substantially in their extent (covering 0.1–58.5% of the Mediterranean Sea) and in the location of additional proposed conservation and management areas. Differences in the criteria, approaches and data used explain such variation. Despite the diversity among proposals, our analyses identified ten areas, encompassing 10% of the Mediterranean Sea, that are consistently identified among the existing proposals, with an additional 10% selected by at least five proposals. These areas represent top priorities for immediate conservation action. Despite the plethora of initiatives, major challenges face Mediterranean biodiversity and conservation. These include the need for spatial prioritization within a comprehensive framework for regional conservation planning, the acquisition of additional information from data-poor areas, species or habitats, and addressing the challenges of establishing transboundary governance and collaboration in socially, culturally and politically complex conditions. Collective prioritised action, not new conservation plans, is needed for the north, western, and high seas of the Mediterranean, while developing initial information-based plans for the south and eastern Mediterranean is an urgent requirement for true regional conservation planning. PMID:23577060
NASA Astrophysics Data System (ADS)
Lackett, J.; Ojima, D. S.; McNeeley, S.
2017-12-01
As climate change impacts become more apparent in our environment, action is needed to enhance the social-ecological system resilience. Incorporating principles which lead to actionable research and project co-development, when appropriate, will facilitate building linkages between the research and the natural resource management communities. In order to develop strategies to manage for climatic and ecosystem changes, collaborative actions are needed between researchers and resource managers to apply appropriate knowledge of the ecosystem and management environments to enable feasible solutions and management actions to respond to climate change. Our team has been involved in developing and establishing a research and engagement center, the North Central Climate Science Center (NC CSC), for the US Department of Interior, to support the development and translation of pertinent climate science information to natural resource managers in the north central portion of the United States. The NC CSC has implemented a platform to support the Resource for Vulnerability Assessment, Adaptation, and Mitigation Projects (ReVAMP) with research, engagement, and training activities to support resource managers and researchers. These activities are aimed at the co-production of appropriate response strategies to climate change in the region, in particular to drought-related responses. Through this platform we, with other partners in the region, including the Department of Interior and the Department of Agriculture, are bringing various training tools, climate information, and management planning tools to resource managers. The implementation of ReVAMP has led to development of planning efforts which include a more explicit representation of climate change as a driver of drought events in our region. Scenario planning provides a process which integrates management goals with possible outcomes derived from observations and simulations of ecological impacts of climate change. Co-development of management options under these various scenarios have allowed for guidance about further research needed, observations needed to better monitor ecological conditions under climate changes, and adaptive management practices to increase resilience.
Body posture modulates action perception.
Zimmermann, Marius; Toni, Ivan; de Lange, Floris P
2013-04-03
Recent studies have highlighted cognitive and neural similarities between planning and perceiving actions. Given that action planning involves a simulation of potential action plans that depends on the actor's body posture, we reasoned that perceiving actions may also be influenced by one's body posture. Here, we test whether and how this influence occurs by measuring behavioral and cerebral (fMRI) responses in human participants predicting goals of observed actions, while manipulating postural congruency between their own body posture and postures of the observed agents. Behaviorally, predicting action goals is facilitated when the body posture of the observer matches the posture achieved by the observed agent at the end of his action (action's goal posture). Cerebrally, this perceptual postural congruency effect modulates activity in a portion of the left intraparietal sulcus that has previously been shown to be involved in updating neural representations of one's own limb posture during action planning. This intraparietal area showed stronger responses when the goal posture of the observed action did not match the current body posture of the observer. These results add two novel elements to the notion that perceiving actions relies on the same predictive mechanism as planning actions. First, the predictions implemented by this mechanism are based on the current physical configuration of the body. Second, during both action planning and action observation, these predictions pertain to the goal state of the action.
ERIC Educational Resources Information Center
Oregon State Economic Development Dept., Salem.
The Oregon Advanced Technology Consortium (OATC) created the Partnerships for Quality Project (PQP) to improve Oregon's community colleges by developing a total quality curriculum (TQC) based on the beliefs and practices of total quality management (TQM). This report summarizes the recommendations of the PQP and presents a plan of action for the…
ERIC Educational Resources Information Center
Maryland State Dept. of Education, Baltimore.
A team consisting of Maryland State Department of Education (MSDE) staff, local educators, and other representatives developed an action plan to assist in advancing the blending of academic, career, and technology education. The team prepared a vision statement, set strategic directions, analyzed barriers, and developed recommendations and actions…
NASA Astrophysics Data System (ADS)
Zeff, Harrison B.; Herman, Jonathan D.; Reed, Patrick M.; Characklis, Gregory W.
2016-09-01
A considerable fraction of urban water supply capacity serves primarily as a hedge against drought. Water utilities can reduce their dependence on firm capacity and forestall the development of new supplies using short-term drought management actions, such as conservation and transfers. Nevertheless, new supplies will often be needed, especially as demands rise due to population growth and economic development. Planning decisions regarding when and how to integrate new supply projects are fundamentally shaped by the way in which short-term adaptive drought management strategies are employed. To date, the challenges posed by long-term infrastructure sequencing and adaptive short-term drought management are treated independently, neglecting important feedbacks between planning and management actions. This work contributes a risk-based framework that uses continuously updating risk-of-failure (ROF) triggers to capture the feedbacks between short-term drought management actions (e.g., conservation and water transfers) and the selection and sequencing of a set of regional supply infrastructure options over the long term. Probabilistic regional water supply pathways are discovered for four water utilities in the "Research Triangle" region of North Carolina. Furthermore, this study distinguishes the status-quo planning path of independent action (encompassing utility-specific conservation and new supply infrastructure only) from two cooperative formulations: "weak" cooperation, which combines utility-specific conservation and infrastructure development with regional transfers, and "strong" cooperation, which also includes jointly developed regional infrastructure to support transfers. Results suggest that strong cooperation aids utilities in meeting their individual objectives at substantially lower costs and with less overall development. These benefits demonstrate how an adaptive, rule-based decision framework can coordinate integrated solutions that would not be identified using more traditional optimization methods.
The role of action control and action planning on fruit and vegetable consumption.
Zhou, Guangyu; Gan, Yiqun; Miao, Miao; Hamilton, Kyra; Knoll, Nina; Schwarzer, Ralf
2015-08-01
Globally, fruit and vegetable intake is lower than recommended despite being an important component to a healthy diet. Adopting or maintaining a sufficient amount of fruit and vegetables in one's diet may require not only motivation but also self-regulatory processes. Action control and action planning are two key volitional determinants that have been identified in the literature; however, it is not fully understood how these two factors operate between intention and behavior. Thus, the aim of the current study was to explore the roles of action control and action planning as mediators between intentions and dietary behavior. A longitudinal study with three points in time was conducted. Participants (N = 286) were undergraduate students and invited to participate in a health behavior survey. At baseline (Time 1), measures of intention and fruit and vegetable intake were assessed. Two weeks later (Time 2), action control and action planning were assessed as putative sequential mediators. At Time 3 (two weeks after Time 2), fruit and vegetable consumption was measured as the outcome. The results revealed action control and action planning to sequentially mediate between intention and subsequent fruit and vegetable intake, controlling for baseline behavior. Both self-regulatory constructs, action control and action planning, make a difference when moving from motivation to action. Our preliminary evidence, therefore, suggests that planning may be more proximal to fruit and vegetable intake than action control. Further research, however, needs to be undertaken to substantiate this conclusion. Copyright © 2015 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Moghaddam, Kamran S.; Usher, John S.
2011-07-01
In this article, a new multi-objective optimization model is developed to determine the optimal preventive maintenance and replacement schedules in a repairable and maintainable multi-component system. In this model, the planning horizon is divided into discrete and equally-sized periods in which three possible actions must be planned for each component, namely maintenance, replacement, or do nothing. The objective is to determine a plan of actions for each component in the system while minimizing the total cost and maximizing overall system reliability simultaneously over the planning horizon. Because of the complexity, combinatorial and highly nonlinear structure of the mathematical model, two metaheuristic solution methods, generational genetic algorithm, and a simulated annealing are applied to tackle the problem. The Pareto optimal solutions that provide good tradeoffs between the total cost and the overall reliability of the system can be obtained by the solution approach. Such a modeling approach should be useful for maintenance planners and engineers tasked with the problem of developing recommended maintenance plans for complex systems of components.
Drawings as a Component of Triangulated Assessment
ERIC Educational Resources Information Center
Otto, Charlotte A.; Everett, Susan A.; Luera, Gail R.; Burke, Christopher F. J.
2013-01-01
Action research (AR) in an educational setting as described by Tillotson (2000), is an approach to "classroom-based problems" or "specific school issues". This process involves identification of the issue or problem, development and implementation of an action plan, gathering and interpreting data, sharing the results within…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alfred Wickline
2009-04-01
Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Buildingmore » 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less
Planning and executing complex large-scale exercises.
McCormick, Lisa C; Hites, Lisle; Wakelee, Jessica F; Rucks, Andrew C; Ginter, Peter M
2014-01-01
Increasingly, public health departments are designing and engaging in complex operations-based full-scale exercises to test multiple public health preparedness response functions. The Department of Homeland Security's Homeland Security Exercise and Evaluation Program (HSEEP) supplies benchmark guidelines that provide a framework for both the design and the evaluation of drills and exercises; however, the HSEEP framework does not seem to have been designed to manage the development and evaluation of multiple, operations-based, parallel exercises combined into 1 complex large-scale event. Lessons learned from the planning of the Mississippi State Department of Health Emergency Support Function--8 involvement in National Level Exercise 2011 were used to develop an expanded exercise planning model that is HSEEP compliant but accounts for increased exercise complexity and is more functional for public health. The Expanded HSEEP (E-HSEEP) model was developed through changes in the HSEEP exercise planning process in areas of Exercise Plan, Controller/Evaluator Handbook, Evaluation Plan, and After Action Report and Improvement Plan development. The E-HSEEP model was tested and refined during the planning and evaluation of Mississippi's State-level Emergency Support Function-8 exercises in 2012 and 2013. As a result of using the E-HSEEP model, Mississippi State Department of Health was able to capture strengths, lessons learned, and areas for improvement, and identify microlevel issues that may have been missed using the traditional HSEEP framework. The South Central Preparedness and Emergency Response Learning Center is working to create an Excel-based E-HSEEP tool that will allow practice partners to build a database to track corrective actions and conduct many different types of analyses and comparisons.
Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode.
Scheib, Jean P P; Stoll, Sarah; Thürmer, J Lukas; Randerath, Jennifer
2018-01-01
The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively.
NASA Astrophysics Data System (ADS)
Fazio, Xavier Eric
Science curriculum reform goals espouse the need to foster and support the development of scientific literacy in students. Two critical goals of scientific literacy are students' engagement in, and developing more realistic conceptions about scientific inquiry (SI) and the nature of science (NOS). In order to promote the learning of these curriculum emphases, teachers themselves must possess beliefs and knowledge supportive of them. Collaborative action research is a viable form of curriculum and teacher development that can be used to support teachers in developing the requisite beliefs and knowledge that can promote these scientific literacy goals. This research study used a collective case study methodology to describe and interpret the views and actions of four teachers participating in a collaborative action research project. I explored the teachers' SI and NOS views throughout the project as they investigated ideas and theories, critically examined their current curricular practice, and implemented and reflected on these modified curricular practices. By the end of the research study, all participants had uniquely augmented their understanding of SI and NOS. The participants were better able to provide explanatory depth to some SI and NOS ideas; however, specific belief revision with respect to SI and NOS ideas was nominal. Furthermore, their idealized action research plans were not implemented to the extent that they were planned. Explanations for these findings include: impact of significant past educational experiences, prior understanding of SI and NOS, depth of content and pedagogical content knowledge of the discipline, and institutional and instructional constraints. Nonetheless, through participation in the collaborative action research process, the teachers developed professionally, personally, and socially. They identified many positive outcomes from participating in a collaborative action research project; however, they espoused constraints to implementing innovative actions. Indeed, local school cultures were barriers to the participants' development. A model of teacher development embracing all the developmental areas is presented---an integration of social, personal, and professional development. Implications and recommendations for future research on teachers' beliefs and knowledge, as well as the viability of collaborative action research to facilitate teacher and curriculum development are presented.
Waste Receiving and Processing (WRAP) Module 1 Hazards Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
CAMPBELL, L.R.
1999-09-29
This document establishes the technical basis in support of Emergency Planning activities for the WRAP Module 1 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone is demonstrated.
76 FR 75771 - Emergency Planning Guidance for Nuclear Power Plants
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-05
... Guidance for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of NUREG... Support of Nuclear Power Plants;'' NSIR/DPR-ISG-01, ``Interim Staff Guidance Emergency Planning for Nuclear Power Plants;'' and NUREG/CR-7002, ``Criteria for Development of Evacuation Time Estimate Studies...
A Meta-Analysis of Urban Climate Change Adaptation Planning in the U.S.
The concentration of people, infrastructure, and ecosystem services in urban areas make them prime sites for climate change adaptation. While advances have been made in developing frameworks for adaptation planning and identifying both real and potential barriers to action, empir...
Final consolidated action plan to Tiger Team. Volume 1, Change 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-04-01
Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A thirdmore » purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less
Final consolidated action plan to Tiger Team. Volume 2, Change 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-04-01
Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficienciesmore » identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less
ERIC Educational Resources Information Center
Kusch, Jim; Rebolledo, Geisha; Ryan, Charly
2005-01-01
This paper responds to a call seeking presenters for an action-research event for elementary-school science teachers in Venezuela. The authors planned on the assumption that the participants would wish to leave with plans for introducing action-research approaches into their practice. In previous writing on action research, the various protocols…
Evaluating the Impact of Action Plans on Trainee Compliance with Learning Objectives
ERIC Educational Resources Information Center
Aumann, Michael J.
2013-01-01
This mixed methods research study evaluated the use of technology-based action plans as a way to help improve compliance with the learning objectives of an online training event. It explored how the action planning strategy impacted subjects in a treatment group and compared them to subjects in a control group who did not get the action plan. The…
42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.
Code of Federal Regulations, 2011 CFR
2011-10-01
... plan amendments. 447.256 Section 447.256 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action on State plans and State plan amendments, is taken in accordance with subpart B of part 430 of this chapter...
42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.
Code of Federal Regulations, 2013 CFR
2013-10-01
... plan amendments. 447.256 Section 447.256 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action on State plans and State plan amendments, is taken in accordance with subpart B of part 430 of this chapter...
49 CFR 234.11 - State highway-rail grade crossing action plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false State highway-rail grade crossing action plans... PLANS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway-rail grade crossings in the ten States that...
49 CFR 234.11 - State highway-rail grade crossing action plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false State highway-rail grade crossing action plans... PLANS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway-rail grade crossings in the ten States that...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... help FDA in developing an enforcement action plan. FDA is seeking input on a number of specific issues... generally and to reduce tobacco use by minors. Tobacco products are responsible for more than 440,000 deaths... other things, that the use of tobacco products by children is a pediatric disease and virtually all new...
1984-01-01
The International Union for the Conservation of Nature and Natural Resources (IUCN), cooperates with the International Planned Parenthood Federation (IPPF) and other agencies to: actively promote policies designed to attain a balance between population and resources, within national conservation strategies and through field activities to preserve nature and natural resources; take into account the fundamental issues of population and resources in its policies, programs, resolutions, and public statements, where appropriate; keep trends in population and resources under review, reporting back to each IUCN General Assembly; encourage nongovernment organizations, including local conservation groups and family planning associations, to work together to spread awareness of the links between population, resources, and the environment; encourage governments to undertake periodic assessments of population trends, natural resources, and likely economic conditions, their interrelationships and the implications for the achievement of national goals; encourage governments to establish a population policy and to consider the special environmental problems of the urban and rural poor and to promote sustainable rural development; encourage nations to take effective action to obtain the basic right of all couples to have access to safe and effective family planning methods, as established in the World Population Plan of Action; and generally encourage national and international development policies which help create the conditions in which human population can successfully be brought into balance with carefully conserved natural resources.
40 CFR Table 4 to Subpart Hhhhhhh... - Applicability of the General Provisions to Part 63
Code of Federal Regulations, 2013 CFR
2013-07-01
... to develop SSM plan for continuous monitoring systems No. § 63.8(c)(5) Continuous opacity monitoring... to an SSM plan. SSM plans are not required § 63.8(e) Continuous monitoring systems performance...)(iv), (b)(2)(v) Actions taken to minimize emissions during SSM No. § 63.10(b)(2)(vi) Recordkeeping for...
Foresight for commanders: a methodology to assist planning for effects-based operations
NASA Astrophysics Data System (ADS)
Davis, Paul K.; Kahan, James P.
2006-05-01
Looking at the battlespace as a system of systems is a cornerstone of Effects-Based Operations and a key element in the planning of such operations, and in developing the Commander's Predictive Environment. Instead of a physical battleground to be approached with weapons of force, the battlespace is an interrelated super-system of political, military, economic, social, information and infrastructure systems to be approached with diplomatic, informational, military and economic actions. A concept that has proved useful in policy arenas other than defense, such as research and development for information technology, addressing cybercrime, and providing appropriate and cost-effective health care, is foresight. In this paper, we provide an overview of how the foresight approach addresses the inherent uncertainties in planning courses of action, present a set of steps in the conduct of foresight, and then illustrate the application of foresight to a commander's decision problem. We conclude that foresight approach that we describe is consistent with current doctrinal intelligence preparation of the battlespace and operational planning, but represents an advance in that it explicitly addresses the uncertainties in the environment and planning in a way that identifies strategies that are robust over different possible ground truths. It should supplement other planning methods.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greenly, G.D. Jr.
1986-03-01
The risk assessment lesson learned from the Bhopal tragedy is both simple and complex. Practical planning for toxic material releases must start with an understanding of what the risks and possible consequences are. Additionally, plans must be formulated to ensure immediate decisive actions tailored to site specific scenarios, and the possible impacts projected on both the plant and surrounding communities. Most importantly, the planning process must include the communities that could be affected. Such planning will ultimately provide significant financial savings and provide for good public relations, and this makes good business sense in both developed and developing countries. Paraphrasingmore » the adage ''a penny saved is a penny earned,'' a penny spent on emergency preparedness is dollars earned through public awareness. The complex aspect of these simple concepts is overcoming human inertia, i.e., overcoming the ''it can't happen here'' syndrome in both government and private industry. A world center of excellence (ITRAC), acting as a center for education, research, and development in the area of emergency planning and response, will be the conduit for needed technology transfer to national centers of excellence in emergency planning and response. These national emergency planning and response centers (NARACS), managed by private industry for governments, will be catalysts to action in formulating effective plans involving potentially affected communities and plant management. The ITRAC/NARAC proposal is a simple concept involving complex ideas to solve the simple problem of being prepared for the Bhopal-like emergency which, as experience has demonstrated, will have complex consequences for the unprepared.« less
NASA Astrophysics Data System (ADS)
Janichewski, S.; Ben Aı̈m, H.
2004-04-01
CNES's latest strategic plan defines the French space agency's strategic focus and charts its course for the 2001-2005 timeframe. Based on a vision of how the space sector will evolve over the period up to 2010, the Strategic Plan sets out the agency's ambition for 2005: " CNES—space technology serving society". This ambition is structured around four challenges: Focusing actions on society's needs in three areas where space technology can make a major difference—environment, science and the information society and mobility. Building the foundation for success by ensuring competitive access to space and boosting basic research and technological innovation. Strengthening national and European synergies to ensure complementarity between: the ESA European framework, which is well adapted for major projects and the development of a European Space Strategy (ESS); and the national framework to support activities of national responsibility such as defence, science and technology development, and to improve competitiveness through direct international cooperation with other space agencies. Forging effective partnerships with its research and industry partners in Europe and France to enhance performance by: developing a service culture; building partnerships; concentrating on core competencies where it can most add value; improving skills and responsiveness in line with its strategic position; ensuring transparent and rigorous management of public funds. This Strategic Plan will be implemented in the 2001-2005 timeframe at all management levels. Implementation will be eased by the fact that the plan has been drawn up through a specific process designed to make internal management aware of the analysis underlying it. This will ensure that all stakeholders understand and appropriate the plan's orientations and thus play an active role in CNES' development. This process involved five successive steps: shared assessment of the space sector's evolution, providing a common baseline from which to build on CNES's vision; shared ambition, defining the agency's objectives and strategic focus; applying lines of action at each of the agency's four space centres through specifically targeted action plans at centre and process level; setting up of a monitoring and oversight structure; definition of a communication strategy to support management of change, designed to keep all CNES personnel informed about the plan and the process behind it.
Kushlan, J.A.
1996-01-01
The conservation and management of wading birds has received considerable attention over the past twenty years, through research, population monitoring, habitat protection, and through activities of specialist groups devoted to all three groups, the herons, ibises and allies, and flamingos. While populations are best known in North America, greatest advances in knowledge may have come in Australasia. The status of most species and many populations is now sufficiently known to allow assessment of risk. Conservation and management techniques allow creation of global and regional action plans for conservation of many species. Global action plans are being developed, but few regional plans have been undertaken. Management of nesting sites is now particularly well appreciated. Although known in broad stroke, much remains to be learned about managing feeding habitat. Problems related to disturbance, conflict with humans, habitat loss, contaminants and other environmental stresses remain for some species and many populations. New challenges lie in creating conservation action that account for genetic stocks.
Cameron, Roy; Manske, Stephen; Brown, K. Stephen; Jolin, Mari Alice; Murnaghan, Donna; Lovato, Chris
2007-01-01
The Canadian Cancer Society and the National Cancer Institute of Canada have charged their Centre for Behavioral Research and Program Evaluation with contributing to the development of the country’s systemic capacity to link research, policy, and practice related to population-level interventions. Local data collection and feedback systems are integral to this capacity. Canada’s School Health Action Planning and Evaluation System (SHAPES) allows data to be collected from all of a school’s students, and these data are used to produce computer-generated school “health profiles.” SHAPES is being used for intervention planning, evaluation, surveillance, and research across Canada. Strong demand and multipartner investment suggest that SHAPES is adding value in all of these domains. Such systems can contribute substantially to evidence-informed public health practice, public engagement, participatory action research, and relevant, timely population intervention research. PMID:17329662
Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-11-20
On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, frommore » which the Team derived four key findings. In the Safety and Health (S H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER).« less
Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-11-20
On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES&H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, from whichmore » the Team derived four key findings. In the Safety and Health (S&H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S&H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER).« less
Berman, Marcie; Bozsik, Frances; Shook, Robin P; Meissen-Sebelius, Emily; Markenson, Deborah; Summar, Shelly; DeWit, Emily; Carlson, Jordan A
2018-02-22
Policy, systems, and environmental approaches are recommended for preventing childhood obesity. The objective of our study was to evaluate the Healthy Lifestyles Initiative, which aimed to strengthen community capacity for policy, systems, and environmental approaches to healthy eating and active living among children and families. The Healthy Lifestyles Initiative was developed through a collaborative process and facilitated by community organizers at a local children's hospital. The initiative supported 218 partners from 170 community organizations through training, action planning, coalition support, one-on-one support, and the dissemination of materials and sharing of resources. Eighty initiative partners completed a brief online survey on implementation strategies engaged in, materials used, and policy, systems, and environmental activities implemented. In accordance with frameworks for implementation science, we assessed associations among the constructs by using linear regression to identify whether and which of the implementation strategies were associated with materials used and implementation of policy, systems, and environmental activities targeted by the initiative. Each implementation strategy was engaged in by 30% to 35% of the 80 survey respondents. The most frequently used materials were educational handouts (76.3%) and posters (66.3%). The most frequently implemented activities were developing or continuing partnerships (57.5%) and reviewing organizational wellness policies (46.3%). Completing an action plan and the number of implementation strategies engaged in were positively associated with implementation of targeted activities (action plan, effect size = 0.82; number of strategies, effect size = 0.51) and materials use (action plan, effect size = 0.59; number of strategies, effect size = 0.52). Materials use was positively associated with implementation of targeted activities (effect size = 0.35). Community-capacity-building efforts can be effective in supporting community organizations to engage in policy, systems, and environmental activities for healthy eating and active living. Multiple implementation strategies are likely needed, particularly strategies that involve a high level of engagement, such as training community organizations and working with them on structured action plans.
Caudroit, Johan; Boiché, Julie; Stephan, Yannick
2014-01-01
Using a moderated mediation model, the present study investigated whether the mediation of intention into physical activity (PA) behaviour via action planning depends on the level of coping planning. A four-month prospective study was conducted among 157 French adults, who were recruited through a web-based survey. They were administrated measures of behavioural intention and sociodemographic variables at baseline and action and coping planning and PA four months later. Action planning partially mediated the contribution of intention on PA level. However, this indirect effect was conditional on the level of coping planning, insofar as action planning acted as a mediator of the intention-PA relationship only for individuals with high level of coping planning. The results highlight the complexity of the relationship between intention and behaviour and provide evidence for the distinct role of both forms of planning.
Planowanie strategiczne kluczowym czynnikiem rozwoju turystyki w regionie
NASA Astrophysics Data System (ADS)
Majewska, Iwona
2009-01-01
Elaborating strategic documents is being perceived as a basis for different initiatives and projects which on the other side stimulate regional and local development in various spheres. Tourism economy is one of the most efficient factor of the local and regional development thanks to its intersector links. It must be also stressed that the tourism economy will have the biggest influence on regional development the less nowadays the tourism potential is being explored. In such situation elaborating professional strategic documents like businessplans, tourism development strategies, tourism product development programmers, feasibility studies plays a key role. Documents containing clear action plans, being a scenario for the next years allow to avoid "ad hoc" actions and at the same time making mistakes that are sometimes very costly. Precisely identified and selected set of objectives and aims allows to concentrate resources on the most important, and, what is crucial, socially accepted actions. In tourism acceptance plays a key role because the whole community participates in tourism development and in image creation that influences directly on attractiveness, number of visitors and economic and social benefits. This is why the strategic planning plays a crucial role in the context of regional and local development.
Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2009-07-01
EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.
NASA Astrophysics Data System (ADS)
Duffy, P. B.; Colohan, P.; Driggers, R.; Herring, D.; Laurier, F.; Petes, L.; Ruffo, S.; Tilmes, C.; Venkataraman, B.; Weaver, C. P.
2014-12-01
Effective adaptation to impacts of climate change requires best-available information. To be most useful, this information should be easily found, well-documented, and translated into tools that decision-makers use and trust. To meet these needs, the President's Climate Action Plan includes efforts to develop "actionable climate science". The Climate Data Initiative (CDI) leverages the Federal Government's extensive, open data resources to stimulate innovation and private-sector entrepreneurship in support of actions to prepare for climate change. The Initiative forges commitments and partnerships from the private, NGO, academic, and public sectors to create data-driven tools. Open data from Federal agencies to support this innovation is available on Climate.Data.gov, initially focusing on coastal flooding but soon to expand to topics including food, energy, water, energy, transportation, and health. The Climate Resilience Toolkit (CRT) will facilitate access to data-driven resilience tools, services, and best practices, including those accessible through the CDI. The CRT will also include access to training and tutorials, case studies, engagement forums, and other information sources. The Climate Action Plan also calls for a public-private partnership on extreme weather risk, with the goal of generating improved assessments of risk from different types of extreme weather events, using methods and data that are transparent and accessible. Finally, the U.S. Global Change Research Program and associated agencies work to advance the science necessary to inform decisions and sustain assessments. Collectively, these efforts represent increased emphasis across the Federal Government on the importance of information to support climate resilience.
49 CFR 27.11 - Remedial action, voluntary action and compliance planning.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 1 2011-10-01 2011-10-01 false Remedial action, voluntary action and compliance....11 Remedial action, voluntary action and compliance planning. (a) Remedial action. (1) If the... discrimination not occurred. (b) Voluntary action. A recipient may take steps, in addition to any action that is...
Kuwait: Security, Reform, and U.S. Policy
2014-01-30
is a member of the Middle East North Africa Financial Action Task Force ( FATF ), but it has been identified by that body as having deficiencies in...Security, Reform, and U.S. Policy Congressional Research Service 24 has developed an action plan with the FATF to address the weaknesses. Some Kuwait
The first powerful steps in strategic development.
Chang, Y N; Platt, W
1986-11-01
In an ever-changing business climate, the need for strategically oriented management increases, for the organization that is insensitive and unresponsive to its environment will not survive. The authors of this "Action Plan" examine the challenges facing the health industry and outline a series of actions for initiating strategic-driven management.
Taking Action: An Educator's Guide to Involving Students in Environmental Projects
ERIC Educational Resources Information Center
Council for Environmental Education, 2012
2012-01-01
Developed in cooperation with the World Wildlife Fund, "Taking Action" inspires ideas and provides models for conducting effective environmental projects--projects that dynamically engage students from start to finish. From adopting species to protecting habitats to saving energy and creating publications, this guide will help educators plan,…
ERIC Educational Resources Information Center
Rogow, Sally M.
1983-01-01
Social routines, which combined nursery rhymes with carefully planned action sequences, were used to help two young developmentally delayed, visually handicapped children acquire communicative responses. Midway through the 3-year project, one child responded to words for objects, people, and actions. (Author/SEW)
ERIC Educational Resources Information Center
New Leaders (NJ1), 2011
2011-01-01
A principal's job, first and foremost, is to diagnose their school's needs and match them to effective principal actions and school practices that drive student success. Successful principals use their diagnosis to build an action plan that pushes their school--and student achievement--to the next level. New Leaders developed the Urban Excellence…
An Action Research Project Exploring the Psychology Curriculum and Transitions to Employment
ERIC Educational Resources Information Center
McMurray, Isabella; Roberts, Pat; Robertson, Ian; Teoh, Kevin
2011-01-01
Within the UK, traditional subject-specific areas are increasingly being complemented by the provision of opportunities to foster students' personal development planning as an aide to support their future employment and lifelong learning. This paper describes an action research project which examined employability skills within a psychology…
The Jomtien Plan of Action in the Sub-Saharan Context.
ERIC Educational Resources Information Center
Thiam, Iba Der
1990-01-01
Suggests that the means to eliminate illiteracy are available in Africa if nations devise and implement a strategy of action based on an effective political will and adopting a methodical, rational approach. Discusses the current situation, negative factors, repercussions on development, and future demands. Argues that promoting basic education…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... items are organized into four focus areas: Surveillance, Prevention and Control, Research, and Product... of the Action Plan: Surveillance, Prevention and Control, Research, and Product Development. Written... for Disease Control and Prevention (CDC), Food and Drug Administration (FDA), and National Institutes...
Inside the Black Box: Tracking Decision-Making in an Action Research Study
ERIC Educational Resources Information Center
Smith, Cathryn
2017-01-01
Action research has been described as "designing the plane while flying it" (Herr & Anderson, 2005, p. 69). A black box documented the researcher's decisions while facilitating leadership development sessions with teacher leaders. Ten process folio steps informed the study through six iterations. Planning steps included a design…
ONR (Office of Naval Research) Research in Distributed Reasoning and Planning.
1987-05-01
Reasoning about Actions and Plans, Timberline Lodge , Timberline , Oregon (1987). [62] Lansky, A.L. "GEMPLAN: Event-based Planning Through Temporal...Actions and Plans, Timberline Lodge , Timberline , Oregon (1987). [71] Litman, D. Plan Recognition and Discourse Analysis. PhD thesis, University of...Workshop on Reasoning about Actions and Plans, Timberline Lodge , Timberlinie. Oregon (1987). [74] Manna, Z. and P.Wolper, "Synthesis of Communicating
Spiegel, M A; Koester, D; Weigelt, M; Schack, T
2012-02-16
How much cognitive effort does it take to change a movement plan? In previous studies, it has been shown that humans plan and represent actions in advance, but it remains unclear whether or not action planning and verbal working memory share cognitive resources. Using a novel experimental paradigm, we combined in two experiments a grasp-to-place task with a verbal working memory task. Participants planned a placing movement toward one of two target positions and subsequently encoded and maintained visually presented letters. Both experiments revealed that re-planning the intended action reduced letter recall performance; execution time, however, was not influenced by action modifications. The results of Experiment 2 suggest that the action's interference with verbal working memory arose during the planning rather than the execution phase of the movement. Together, our results strongly suggest that movement planning and verbal working memory share common cognitive resources. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.
42 CFR 433.138 - Identifying liable third parties.
Code of Federal Regulations, 2013 CFR
2013-10-01
... processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval system approved by CMS under subpart C of... plan must be integrated with the mechanized claims processing and information retrieval system. (2) The...
42 CFR 433.138 - Identifying liable third parties.
Code of Federal Regulations, 2014 CFR
2014-10-01
... processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval system approved by CMS under subpart C of... plan must be integrated with the mechanized claims processing and information retrieval system. (2) The...
42 CFR 433.138 - Identifying liable third parties.
Code of Federal Regulations, 2012 CFR
2012-10-01
... processing and information retrieval system. Basic requirement—Development of an action plan. (1) If a State has a mechanized claims processing and information retrieval system approved by CMS under subpart C of... plan must be integrated with the mechanized claims processing and information retrieval system. (2) The...
Management Matters: Planning Goals and Time
ERIC Educational Resources Information Center
Pappas, Marjorie L.
2004-01-01
This article discusses the importance of setting and implementing goals that can help change and improve a library media program over time--goals that go beyond merely keeping the library media center running. Suggestions for developing an action plan and strategies for effective time management are also presented.
[Smallpox preparedness in Denmark].
Heegaard, Erik Deichmann; Fomsgaard, Anders
2005-09-05
Although the likelihood of a deliberate release is considered to be minor, smallpox virus poses a worldwide terrorism security risk because it (1) can easily be disseminated and transmitted from person to person; (2) results in high mortality rates and has the potential to create a major public health impact; (3) might cause public panic and social disruption; and (4) requires special action for public health preparedness. Consequently, Statens Serum Institute and the National Board of Health have developed a Danish smallpox preparedness plan. This article discusses critical aspects of the plan, including risk analysis and a multi-tiered action plan, vaccination, analysis of clinical specimens, the establishment of active surveillance teams and generic contingency elements.
28 CFR 115.404 - Audit corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...
28 CFR 115.404 - Audit corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...
28 CFR 115.404 - Audit corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...
Bousquet, J; Farrell, J; Crooks, G; Hellings, P; Bel, E H; Bewick, M; Chavannes, N H; de Sousa, J Correia; Cruz, A A; Haahtela, T; Joos, G; Khaltaev, N; Malva, J; Muraro, A; Nogues, M; Palkonen, S; Pedersen, S; Robalo-Cordeiro, C; Samolinski, B; Strandberg, T; Valiulis, A; Yorgancioglu, A; Zuberbier, T; Bedbrook, A; Aberer, W; Adachi, M; Agusti, A; Akdis, C A; Akdis, M; Ankri, J; Alonso, A; Annesi-Maesano, I; Ansotegui, I J; Anto, J M; Arnavielhe, S; Arshad, H; Bai, C; Baiardini, I; Bachert, C; Baigenzhin, A K; Barbara, C; Bateman, E D; Beghé, B; Kheder, A Ben; Bennoor, K S; Benson, M; Bergmann, K C; Bieber, T; Bindslev-Jensen, C; Bjermer, L; Blain, H; Blasi, F; Boner, A L; Bonini, M; Bonini, S; Bosnic-Anticevitch, S; Boulet, L P; Bourret, R; Bousquet, P J; Braido, F; Briggs, A H; Brightling, C E; Brozek, J; Buhl, R; Burney, P G; Bush, A; Caballero-Fonseca, F; Caimmi, D; Calderon, M A; Calverley, P M; Camargos, P A M; Canonica, G W; Camuzat, T; Carlsen, K H; Carr, W; Carriazo, A; Casale, T; Cepeda Sarabia, A M; Chatzi, L; Chen, Y Z; Chiron, R; Chkhartishvili, E; Chuchalin, A G; Chung, K F; Ciprandi, G; Cirule, I; Cox, L; Costa, D J; Custovic, A; Dahl, R; Dahlen, S E; Darsow, U; De Carlo, G; De Blay, F; Dedeu, T; Deleanu, D; De Manuel Keenoy, E; Demoly, P; Denburg, J A; Devillier, P; Didier, A; Dinh-Xuan, A T; Djukanovic, R; Dokic, D; Douagui, H; Dray, G; Dubakiene, R; Durham, S R; Dykewicz, M S; El-Gamal, Y; Emuzyte, R; Fabbri, L M; Fletcher, M; Fiocchi, A; Fink Wagner, A; Fonseca, J; Fokkens, W J; Forastiere, F; Frith, P; Gaga, M; Gamkrelidze, A; Garces, J; Garcia-Aymerich, J; Gemicioğlu, B; Gereda, J E; González Diaz, S; Gotua, M; Grisle, I; Grouse, L; Gutter, Z; Guzmán, M A; Heaney, L G; Hellquist-Dahl, B; Henderson, D; Hendry, A; Heinrich, J; Heve, D; Horak, F; Hourihane, J O' B; Howarth, P; Humbert, M; Hyland, M E; Illario, M; Ivancevich, J C; Jardim, J R; Jares, E J; Jeandel, C; Jenkins, C; Johnston, S L; Jonquet, O; Julge, K; Jung, K S; Just, J; Kaidashev, I; Kaitov, M R; Kalayci, O; Kalyoncu, A F; Keil, T; Keith, P K; Klimek, L; Koffi N'Goran, B; Kolek, V; Koppelman, G H; Kowalski, M L; Kull, I; Kuna, P; Kvedariene, V; Lambrecht, B; Lau, S; Larenas-Linnemann, D; Laune, D; Le, L T T; Lieberman, P; Lipworth, B; Li, J; Lodrup Carlsen, K; Louis, R; MacNee, W; Magard, Y; Magnan, A; Mahboub, B; Mair, A; Majer, I; Makela, M J; Manning, P; Mara, S; Marshall, G D; Masjedi, M R; Matignon, P; Maurer, M; Mavale-Manuel, S; Melén, E; Melo-Gomes, E; Meltzer, E O; Menzies-Gow, A; Merk, H; Michel, J P; Miculinic, N; Mihaltan, F; Milenkovic, B; Mohammad, G M Y; Molimard, M; Momas, I; Montilla-Santana, A; Morais-Almeida, M; Morgan, M; Mösges, R; Mullol, J; Nafti, S; Namazova-Baranova, L; Naclerio, R; Neou, A; Neffen, H; Nekam, K; Niggemann, B; Ninot, G; Nyembue, T D; O'Hehir, R E; Ohta, K; Okamoto, Y; Okubo, K; Ouedraogo, S; Paggiaro, P; Pali-Schöll, I; Panzner, P; Papadopoulos, N; Papi, A; Park, H S; Passalacqua, G; Pavord, I; Pawankar, R; Pengelly, R; Pfaar, O; Picard, R; Pigearias, B; Pin, I; Plavec, D; Poethig, D; Pohl, W; Popov, T A; Portejoie, F; Potter, P; Postma, D; Price, D; Rabe, K F; Raciborski, F; Radier Pontal, F; Repka-Ramirez, S; Reitamo, S; Rennard, S; Rodenas, F; Roberts, J; Roca, J; Rodriguez Mañas, L; Rolland, C; Roman Rodriguez, M; Romano, A; Rosado-Pinto, J; Rosario, N; Rosenwasser, L; Rottem, M; Ryan, D; Sanchez-Borges, M; Scadding, G K; Schunemann, H J; Serrano, E; Schmid-Grendelmeier, P; Schulz, H; Sheikh, A; Shields, M; Siafakas, N; Sibille, Y; Similowski, T; Simons, F E R; Sisul, J C; Skrindo, I; Smit, H A; Solé, D; Sooronbaev, T; Spranger, O; Stelmach, R; Sterk, P J; Sunyer, J; Thijs, C; To, T; Todo-Bom, A; Triggiani, M; Valenta, R; Valero, A L; Valia, E; Valovirta, E; Van Ganse, E; van Hage, M; Vandenplas, O; Vasankari, T; Vellas, B; Vestbo, J; Vezzani, G; Vichyanond, P; Viegi, G; Vogelmeier, C; Vontetsianos, T; Wagenmann, M; Wallaert, B; Walker, S; Wang, D Y; Wahn, U; Wickman, M; Williams, D M; Williams, S; Wright, J; Yawn, B P; Yiallouros, P K; Yusuf, O M; Zaidi, A; Zar, H J; Zernotti, M E; Zhang, L; Zhong, N; Zidarn, M; Mercier, J
2016-01-01
Action Plan B3 of the European Innovation Partnership on Active and Healthy Ageing (EIP on AHA) focuses on the integrated care of chronic diseases. Area 5 (Care Pathways) was initiated using chronic respiratory diseases as a model. The chronic respiratory disease action plan includes (1) AIRWAYS integrated care pathways (ICPs), (2) the joint initiative between the Reference site MACVIA-LR (Contre les MAladies Chroniques pour un VIeillissement Actif) and ARIA (Allergic Rhinitis and its Impact on Asthma), (3) Commitments for Action to the European Innovation Partnership on Active and Healthy Ageing and the AIRWAYS ICPs network. It is deployed in collaboration with the World Health Organization Global Alliance against Chronic Respiratory Diseases (GARD). The European Innovation Partnership on Active and Healthy Ageing has proposed a 5-step framework for developing an individual scaling up strategy: (1) what to scale up: (1-a) databases of good practices, (1-b) assessment of viability of the scaling up of good practices, (1-c) classification of good practices for local replication and (2) how to scale up: (2-a) facilitating partnerships for scaling up, (2-b) implementation of key success factors and lessons learnt, including emerging technologies for individualised and predictive medicine. This strategy has already been applied to the chronic respiratory disease action plan of the European Innovation Partnership on Active and Healthy Ageing.
Continuous Energy Improvement in Motor Driven Systems - A Guidebook for Industry
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gilbert A. McCoy and John G. Douglass
2014-02-01
This guidebook provides a step-by-step approach to developing a motor system energy-improvement action plan. An action plan includes which motors should be repaired or replaced with higher efficiency models, recommendations on maintaining a spares inventory, and discussion of improvements in maintenance practices. The guidebook is the successor to DOE’s 1997 Energy Management for Motor Driven Systems. It builds on its predecessor publication by including topics such as power transmission systems and matching driven equipment to process requirements in addition to motors.
Nechaev, A P
2001-01-01
Results of the investigation of the interrelation between cosmonauts' erroneous actions and work and rest schedule intensity in fourteen long-duration Mir missions are presented in the paper. The statistical significance of this dependence has been established, and its nonlinear character has been revealed. An algorithm of short-range planning of crew operations has been developed based on determination of critical crew work loads deduced from increases in erroneous actions. Together with other methods the suggested approach may be used to raise cosmonauts' performance reliability.
What public officials need to know about connected vehicles.
DOT National Transportation Integrated Search
1996-06-01
The Standards Development Plan identifies potential standards areas, reviews existing standards efforts, describes a general process to assist standards development, and suggests beneficial actions to support and encourage ITS deployment. This docume...
Trammel, E. Jamie; Carter, Sarah; Haby, Travis S.; Taylor, Jason J.
2018-01-01
Enhancing natural resource management has been a focus of landscape ecology since its inception, but numerous authors argue that landscape ecology has not yet been effective in achieving the underlying goal of planning and designing sustainable landscapes. We developed nine questions reflecting the application of fundamental research topics in landscape ecology to the landscape planning process and reviewed two recent landscape-scale plans in western North America for evidence of these concepts in plan decisions. Both plans considered multiple resources, uses, and values, including energy development, recreation, conservation, and protection of cultural and historic resources. We found that land use change and multiscale perspectives of resource uses and values were very often apparent in planning decisions. Pattern-process relationships, connectivity and fragmentation, ecosystem services, landscape history, and climate change were reflected less frequently. Landscape sustainability was considered only once in the 295 decisions reviewed, and outputs of landscape models were not referenced. We suggest six actionable opportunities for further integrating landscape ecology concepts into landscape planning efforts: 1) use landscape sustainability as an overarching goal, 2) adopt a broad ecosystem services framework, 3) explore the role of landscape history more comprehensively, 4) regularly consider and accommodate potential effects of climate change, 5) use landscape models to support plan decisions, and 6) promote a greater presence of landscape ecologists within agencies that manage large land bases and encourage active involvement in agency planning efforts. Together these actions may improve the defensibility, durability, and sustainability of landscape plan decisions.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-06
... analyses and the development of other elements of the standard; developing a written action plan for..., revalidating and retaining the process hazard analysis; developing and implementing written operating [[Page 66639
From action planning and plan enactment to fruit consumption: moderated mediation effects.
Kasten, Stefanie; van Osch, Liesbeth; Eggers, Sander Matthijs; de Vries, Hein
2017-10-23
Sufficient fruit consumption is beneficial for a healthy live. While many Dutch adults intent to eat the recommended amount of fruit, only 5-10% of the population actually adheres to the recommendation. One mechanism that can help to narrow this gap between intention and actual fruit consumption is action planning. However, action planning is only assumed to be effective if plans are enacted. This study assessed which action plans are made and enacted, and further aimed to investigate two main hypotheses: 1. the effect of action planning (at T1) on fruit consumption (at T2) is mediated by plan enactment (at T3); 2. positive intentions (2a), high self-efficacy (2b) and a strong habit to eat fruit (2c) enhance the mediation of plan enactment, whereas a strong habit to eat snacks (2d) hinders the mediation of plan enactment. This study was a self-reported longitudinal online survey study. A total of 428 participants filled in a survey, measuring demographic factors (e.g. gender, age, education level), several socio-cognitive constructs (i.e. attitudes, self-efficacy, habit, action planning, plan enactment), and fruit consumption, at three points in time (baseline, after 1 month, and after 3 months). Mediation and moderated mediation analyses were used to investigate the planning-plan enactment- fruit consumption relationship. Up to 70% of the participants reported to have enacted their T1 action plans at T2. Action planning on fruit consumption was fully mediated by plan enactment (Hypothesis 1). All four proposed moderators (i.e. intention, self-efficacy, habit to consume fruit, and habit to consume snacks) significantly influenced the mediation (Hypotheses 2a-2d). Mediation of plan enactment was only present with high levels of intention, high levels of self-efficacy, strong habits to eat fruit, and weak habits to eat snacks. The study suggests the importance of plan enactment for fruit consumption. Furthermore, it emphasizes the necessity of facilitating factors. High levels of intention, self-efficacy and a strong habit to consume fruit clearly aid the enactment of action plans. This suggests that when these factors are moderately low, plan enactment may fail and thus an intervention may require first steps to foster these moderating factors.
Climate Action Planning Tool | NREL
NREL's Climate Action Planning Tool provides a quick, basic estimate of how various technology options can contribute to an overall climate action plan for your research campus. Use the tool to
Galvan, T L; Burkness, E C; Hutchison, W D
2007-06-01
To develop a practical integrated pest management (IPM) system for the multicolored Asian lady beetle, Harmonia axyridis (Pallas) (Coleoptera: Coccinellidae), in wine grapes, we assessed the spatial distribution of H. axyridis and developed eight sampling plans to estimate adult density or infestation level in grape clusters. We used 49 data sets collected from commercial vineyards in 2004 and 2005, in Minnesota and Wisconsin. Enumerative plans were developed using two precision levels (0.10 and 0.25); the six binomial plans reflected six unique action thresholds (3, 7, 12, 18, 22, and 31% of cluster samples infested with at least one H. axyridis). The spatial distribution of H. axyridis in wine grapes was aggregated, independent of cultivar and year, but it was more randomly distributed as mean density declined. The average sample number (ASN) for each sampling plan was determined using resampling software. For research purposes, an enumerative plan with a precision level of 0.10 (SE/X) resulted in a mean ASN of 546 clusters. For IPM applications, the enumerative plan with a precision level of 0.25 resulted in a mean ASN of 180 clusters. In contrast, the binomial plans resulted in much lower ASNs and provided high probabilities of arriving at correct "treat or no-treat" decisions, making these plans more efficient for IPM applications. For a tally threshold of one adult per cluster, the operating characteristic curves for the six action thresholds provided binomial sequential sampling plans with mean ASNs of only 19-26 clusters, and probabilities of making correct decisions between 83 and 96%. The benefits of the binomial sampling plans are discussed within the context of improving IPM programs for wine grapes.
Advancing Medication Safety: Establishing a National Action Plan for Adverse Drug Event Prevention.
Harris, Yael; Hu, Dale J; Lee, Christine; Mistry, Mishale; York, Andrew; Johnson, Tisha K
2015-08-01
Adverse drug events (ADEs) are important contributors to preventable morbidity and mortality, comprising one third of all hospital adverse events. In response to growing evidence detailing the high prevalence of ADEs, particularly among vulnerable older adults, Congress requested that the Secretary of the Department of Health and Human Services (HHS) convene a Federal Interagency Steering Committee to establish a National Action Plan to focus on ADE prevention. In August 2014, the Office of Disease Prevention and Health Promotion released the final version of the National Action Plan for Adverse Drug Event Prevention. The Action Plan directly supports the goals of the HHS Strategic Plan and the Patient Protection and Affordable Care Act by providing guidance on tracking and preventing ADEs, as well as describing evidence-based tools and resources to enhance medication safety. ADE ACTION PLAN CONTENT: The Federal Interagency Steering Committee focused the Action Plan on ADEs that are clinically significant, account for the greatest number of measurable harms as identified by using existing surveillance tools, and are largely preventable. As such, the decision was made to target three medication classes: anticoagulants, diabetes agents (insulin and oral hypoglycemic agents), and opioids. The Action Plan is organized around four key areas: surveillance; evidence-based prevention; payment, policy incentives, and oversight; and research opportunities to advance medication safety. One measure of the ADE Action Plan's success will be the wider dissemination of information and educational resources to providers and patients (or consumers) regarding the risks associated with medications. Future Action Plan iterations are likely to consider other high-priority medication classes and update the recommendations.
29 CFR 1917.30 - Emergency action plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1917.30 Section 1917.30 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to themore » FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.« less
Emilie, Balbirnie; Matthew, Davies; Emma, Disley; Cristina Gonzalez, Monsalve; Stephen, Hartka; Stijn, Hoorens; Kristy, Kruithof; Martin, Sacher; Jirka, Taylor
2018-01-01
The aim of the EU Drugs Strategy 2013-2020 is to contribute to a reduction in drug demand and drug supply within the EU. The Strategy has so far been implemented by an Action Plan covering the period 2013-2016. This article sets out the findings of an evaluation that assesses the degree of implementation of the Strategy and the Action Plan in terms of outputs and, where possible, impacts. It looks at the extent to which the objectives of the Strategy have been achieved. The evaluation aims to provide evidence to support the European Commission's decision about whether to propose a new Action Plan for the period 2017-2020 and, if so, what changes would be needed compared to the current plan. Through applying a mixed-methods approach, the evaluation examined the effectiveness, efficiency, relevance and coherence of the actions undertaken on the basis of the EU Drugs Strategy and the Action Plan, as well as their EU added value. The evaluation makes 20 recommendations, addressed to the European Commission, Member States, the European Council and other stakeholders. The key recommendation for the Commission is that a new Action Plan should be implemented for the period 2017-2020. This should be an updated version of the current Action Plan, rather than taking a new approach or introducing more new actions.
36 CFR 906.4 - Formulation of affirmative action plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... development from establishment of the development team to operation and management of the development project... component, the developer should give consideration to creating business and employment opportunities and... connection with construction and operation; (4) Contracting for construction, operation, and maintenance; and...
[For a sexual health free from violence].
1995-12-01
The United Nations has conducted world conferences on development and people. The conference in Cairo on development and population produced a Plan of Action, and the one in Beijing on women produced a Platform of Action, that obligate all in the public and private sectors to execute new programs in the area of sexual and reproductive health. These documents were adopted by consensus and explain such basic concepts as equality; policies sensitive to gender; violence against women and its implications; the relationship between development, population, the environment, and women; and the new sexual and reproductive rights. These platforms and action plans help Profamilia to complete its programs for men, women, and youth. In this spirit Profamilia has realized a series of efforts to internalize a respect for liberty and equality for women and to understand reproductive responsibilities for both sexes. The new secretary general of the International Federation of Planned Parenthood declared in Beijing that as long as there are women who lack the freedom to exercise their reproductive options and continue to suffer and die from unwanted pregnancy the global nongovernmental organizations must work assiduously to reinforce their solidarity with these women to make a difference. The Colombian population awaits public policies that achieve sexual and reproductive health free of coercion, discrimination, and violence.
Goal Reconstruction: How Teton Blends Situated Action and Planned Action
1989-11-03
DTIC FILE COPY CV), Goal reconstruction: How Teton blends N situated action and planned action N Tec~jcal Report PCG- 16 Kurt VanLehn I William Bali...situated action and planned action Technical Report PCG- 16 Kurt VanLehn William Bail Departments of Psychology and Computer Science Carnegie-Mellon...Research, under contract N00014-88-K-0086 and by the Information Sciences Division, Office of Naval Research, under contract N00014-K-0678
49 CFR 1106.3 - Actions for which Safety Integration Plan is required.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A SIP...
Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan
ERIC Educational Resources Information Center
Mansell, Michelle
2010-01-01
The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…
Code of Federal Regulations, 2010 CFR
2010-04-01
... likely to be remedied in a cost-effective manner through the Restructuring Plan. (3) Exception for sale... Restructuring Plan because of actions or omissions of owner or affiliate or project condition. 401.403 Section...-MARKET) Restructuring Plan § 401.403 Rejection of a request for a Restructuring Plan because of actions...
The Persuasive Program in Adult Education: Theory and Planning.
ERIC Educational Resources Information Center
Atkinson, Thomas Grant
The purpose of this study was to investigate, develop, and explicate a procedure, theoretical in nature, which adult educators can use for comprehending, analyzing and planning single-event persuasive programs for adults. The study conceptualized persuasion as a behavioral phenomenon consisting of verifiable human action which constitutes, or is…
DOT National Transportation Integrated Search
2017-02-01
The authors reviewed the literature on planning intermodal transit facilities, extracting recommendations about station and station-area design and land uses, operation of transportation services, and policy actions for station-area planning. They al...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-22
... Compounds and Emissions Banking and Trading AGENCY: Environmental Protection Agency (EPA). ACTION: Direct... ``Emissions Banking and Trading'' removes all definitions, as they are now included in the general definitions... Delivery: Amy Bhesania, Environmental Protection Agency, Air Planning and Development Branch, 11201 Renner...
National Fire Plan Research and Development 2001 Business Summary
USDA Forest Service
2002-01-01
Wildland fire remains a serious concern to the people of our Nation. This concern has been turned into action in the form of the National Fire Plan (NFP), an accelerated interagency effort, begun after the disastrous 2000 fire season, to step up, coordinate, and concentrate activity on reducing fire risks.
ERIC Educational Resources Information Center
Nolan, Harry
2007-01-01
Preventing disasters is a top priority for safety professionals at schools and universities, but it is equally important to have a well-developed evacuation plan that can be put into action at a moment's notice. The planning must take into account all conceivable disasters, including acts of terrorism, gas leaks, chemical spills, collapses,…
Expanded Outreach at Clemson University. A Case Study.
ERIC Educational Resources Information Center
Bennett, A. Wayne
This paper summarizes recent strategic planning activities at Clemson University, focusing on outreach and extended education goals at the university. Specific benchmarks for outreach and extended education include: (1) by May 1994, each department will develop an operational definition of its public service mission, an action plan to integrate…
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2011 CFR
2011-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2013 CFR
2013-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2012 CFR
2012-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2014 CFR
2014-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
24 CFR 91.520 - Performance reports.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Performance reports. 91.520 Section... Requirements § 91.520 Performance reports. (a) General. Each jurisdiction that has an approved consolidated... carrying out its strategic plan and its action plan. The performance report must include a description of...
24 CFR 91.520 - Performance reports.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Performance reports. 91.520 Section... Requirements § 91.520 Performance reports. (a) General. Each jurisdiction that has an approved consolidated... carrying out its strategic plan and its action plan. The performance report must include a description of...
24 CFR 91.520 - Performance reports.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Performance reports. 91.520 Section... Requirements § 91.520 Performance reports. (a) General. Each jurisdiction that has an approved consolidated... carrying out its strategic plan and its action plan. The performance report must include a description of...
24 CFR 91.520 - Performance reports.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Performance reports. 91.520 Section... Requirements § 91.520 Performance reports. (a) General. Each jurisdiction that has an approved consolidated... carrying out its strategic plan and its action plan. The performance report must include a description of...
24 CFR 91.520 - Performance reports.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Performance reports. 91.520 Section... Requirements § 91.520 Performance reports. (a) General. Each jurisdiction that has an approved consolidated... carrying out its strategic plan and its action plan. The performance report must include a description of...
40 CFR 63.1367 - Recordkeeping requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) of subpart A of this part. (3) Startup, shutdown, and malfunction plan. The owner or operator of an affected source shall develop a written startup, shutdown, and malfunction plan as specified in § 63.6(e)(3... during periods of startup, shutdown, and malfunction and a program for corrective action for a...
Teachers' Plans for Managing Students.
ERIC Educational Resources Information Center
Pittman, Sherry I.
A study of three first grade teachers, who were interviewed and observed in the classroom setting, demonstrates a link between teachers' plans for action that they have developed over years of teaching and their routine management of students during reading. Both management and instructional goals, embedded in teacher beliefs about learning and…
Four years after the approval of its Comprehensive Conservation and Management Plan (CCMP), the San Juan Bay Estuary Program (SJBEP) is working towards the implementation stage of its 49 actions. During the last three years the program has focused its efforts in developing a coll...
77 FR 22286 - Western Pacific Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-13
... Team (PPT) in Honolulu, HI to discuss fishery issues and develop recommendations for future management... and Central Pacific Fishery Commission 8. Other business 9. Public comment 10. Pelagic Plan Team... meetings. Plan Team action will be restricted to those issues specifically listed in this document and any...
Local District Planning Model Guidebook.
ERIC Educational Resources Information Center
New Jersey State Dept. of Education, Trenton.
The purpose of this guidebook is to assist chief school administrators of New Jersey's schools in the development of educational objectives and plans of action. Section 1 discusses district submission procedures, including description of the procedure to be followed, basic requirements, and review and approval processes. Section 2 presents a model…
Astrøm, Anne Nordrehaug
2008-06-01
Using a prospective design and a representative sample of 25-yr-old Norwegians, this study hypothesized that action planning and coping planning will add to the prediction of flossing at 4 wk of follow-up over and above the effect of intention and previous flossing. This study tested the validity of a proposed 3-factor structure of the measurement model of intention, action planning, and coping planning and for its invariance across gender. A survey was conducted in three Norwegian counties, and 1,509 out of 8,000 randomly selected individuals completed questionnaires assessing the constructs of action planning and coping planning related to daily flossing. A random subsample of 500 participants was followed up at 4 wk with a telephone interview to assess flossing. Confirmatory factor analysis (CFA) confirmed the proposed 3-factor model after respecification. Although the chi-square test was statistically significant [chi(2) = 58.501, degrees of freedom (d.f.) = 17), complementary fit indices were satisfactory [goodness-of-fit index (GFI) = 0.99, root mean squared error of approximation (RMSEA) = 0.04]. Multigroup CFA provided evidence of complete invariance of the measurement model across gender. After controlling for previous flossing, intention (beta = 0.08) and action planning (beta = 0.11) emerged as independent predictors of subsequent flossing, accounting for 2.3% of its variance. Factorial validity of intention, action planning and coping planning, and the validity of action planning in predicting flossing prospectively, was confirmed by the present study.
Gifford, Wendy; Davies, Barbara; Tourangeau, Ann; Lefebre, Nancy
2011-01-01
Research describes leadership as important to guideline use. Yet interventions to develop current and future leaders for this purpose are not well understood. To describe the planning and evaluation of a leadership intervention to facilitate nurses' use of guideline recommendations for diabetic foot ulcers in home health care. Planning the intervention involved a synthesis of theory and research (qualitative interviews and chart audits). One workshop and three follow-up teleconferences were delivered at two sites to nurse managers and clinical leaders (n=15) responsible for 180 staff nurses. Evaluation involved workshop surveys and interviews. Highest rated intervention components (four-point scale) were: identification of target indicators (mean 3.7), and development of a team leadership action plan (mean 3.5). Pre-workshop barriers assessment rated lowest (mean 2.9). Three months later participants indicated their leadership performance had changed as a result of the intervention, being more engaged with staff and clear about implementation goals. Creating a team leadership action plan to operationalize leadership behaviours can help in delivery of evidence-informed care. Access to clinical data and understanding team leadership knowledge and skills prior to formal training will assist nursing management in tailoring intervention strategies to identify needs and gaps. © 2010 The Authors. Journal compilation © 2010 Blackwell Publishing Ltd.
Department of Transportation Radionavigation Action Plan Summary
DOT National Transportation Integrated Search
1979-04-01
The first issue by the Department of Transportation (DOT) of its Radionavigation Action Plan Summary is presented herein. The DOT Radionavigation Action Plan Summary describes major DOT activities and decisions relating to navigation through 1985. Th...
Taylor, Bev; Roberts, Sue; Smyth, Therese; Tulloch, Moira
2015-10-01
To raise nurse managers' critical awareness of practice problems; uncover practice constraints and improve work effectiveness. Nurse management requires skills and knowledge, underscored by emotional intelligence. The research improved participants' practice and personal insights. Purposive sampling targeted nurse managers interested in improving their practice. Three experienced female nurse managers met fortnightly in a group, for 1 hour, for 10 meetings. The methods included: writing and sharing de-identified journal reflections; critically analysing practice stories; identifying a thematic concern; generating action strategies; and instituting and revising the action plan. Phase One resulted in the identification of the issue of 'being drained by the intensity of nurse managers' work'. The participants adopted five strategies: debriefing problematic situations; deflecting multiple requests; diffusing issues; naming dysfunctional behaviours; and regrouping. In Phase Two, participants implemented and revised the action plan strategies, which resulted in them feeling less drained by their work. Strategies can lessen nurse managers' sense of personal depletion. However, strategies cannot guarantee success every time because the emotional intelligence is integral to nurse management. Action research and reflection assist nurse managers to improve their practice and develop their emotional intelligence. © 2014 John Wiley & Sons Ltd.
Lukersmith, Sue; Fernandez, Ana; Millington, Michael; Salvador-Carulla, Luis
2016-04-01
Case management is a complex intervention. Complexity arises from the interaction of different components: the model (theoretical basis), implementation context (service), population and health condition, focus for the intervention (client and/or their family), case manager's actions (interventions) and the target of case management (integrated care and support, client's community participation). There is a lack of understanding and a common language. To our knowledge there is no classification (taxonomy) for community-based case management. To develop a community-based case management in brain injury taxonomy (BICM-T), as a common language and understanding of case management for use in quality analysis, policy, planning and practice. The mixed qualitative methods used multiple sources of knowledge including scoping, framing and a nominal group technique to iteratively develop the Beta version (draft) of the taxonomy. A two part developmental evaluation involving case studies and mapping to international frameworks assessed the applicability and acceptability (feasibility) before finalization of the BICM-T. The BICM-T includes a definition of community-based case management, taxonomy trees, tables and a glossary. The interventions domain tree has 9 main actions (parent category): engagement, holistic assessment, planning, education, training and skills development, emotional and motivational support, advising, coordination, monitoring; 17 linked actions (children category); 8 related actions; 63 relevant terms defined in the glossary. The BICM-T provides a knowledge map with the definitions and relationships between the core actions (interventions domain). Use of the taxonomy as a common language will benefit practice, quality analysis, evaluation, policy, planning and resource allocation. Copyright © 2016 The Authors. Published by Elsevier Inc. All rights reserved.
Developing Air Defense Artillery Warrant Officers Cognitive Skills: An Analysis of Training Needs
2018-02-01
statement of actions, conditions, and standards. The lesson descriptions were compared to the action verbs used in the lesson action text and standards...performance and compared these findings to the training WOs receive in formal courses during their career progression. Findings indicated differing...are all required cognitive skills for ADA WOs, decision- making and planning skills are the most prevalent. A comparative analysis identified three
ERIC Educational Resources Information Center
Williams, David L., Ed.; Munstermann, Ulrich, Ed.; Bouwsma, Maria, Ed.; Dubock, Linda, Ed.; Rot, Karen, Ed.
This document contains action paper reports from an international youth assembly that was held to enable young people from around the world to discuss a variety of social and economic issues and develop a common vision and plan of action. The report by the Committee on Youth Employment and Education examines the current state of education, its…
Base Realignment and Closure (BRAC) Cleanup Plan
1995-01-01
remedial action (RA). A number of restoration-related compliance activities at Cameron Station have also been completed or are ongoing. These include...from the identification stage to completion of remedial actions and development of NFRAP documentation. Table 3-2 also lists the study area...5 4.1.3.2 Remediation Timelines and Documents ............. 4-6 4.1.4 Environmental Restoration Early Actions Strategy ........... 4-10 4.1.5 Remedy
van Osch, Liesbeth; Beenackers, Mariëlle; Reubsaet, Astrid; Lechner, Lilian; Candel, Math; de Vries, Hein
2009-01-01
Background Large discrepancies between people's intention to eat a healthy diet and actual dietary behavior indicate that motivation is not a sufficient instigator for healthy behavior. Research efforts to decrease this 'intention - behavior gap' have centered on aspects of self-regulation, most importantly self-regulatory planning. Most studies on the impact of self-regulatory planning in health and dietary behavior focus on the promotion of health protective behaviors. This study investigates and compares the predictive value of action planning in health protective behavior and the restriction of health risk behavior. Methods Two longitudinal observational studies were performed simultaneously, one focusing on fruit consumption (N = 572) and one on high-caloric snack consumption (N = 585) in Dutch adults. Structural equation modeling was used to investigate and compare the predictive value of action planning in both behaviors, correcting for demographics and the influence of motivational factors and past behavior. The nature of the influence of action planning was investigated by testing mediating and moderating effects. Results Action planning was a significant predictor of fruit consumption and restricted snack consumption beyond the influence of motivational factors and past behavior. The strength of the predictive value of action planning did not differ between the two behaviors. Evidence for mediation of the intention - behavior relationship was found for both behaviors. Positive moderating effects of action planning were demonstrated for fruit consumption, indicating that individuals who report high levels of action planning are significantly more likely to translate their intentions into actual behavior. Conclusion The results indicate that the planning of specific preparatory actions predicts the performance of healthy dietary behavior and support the application of self-regulatory planning in both health protective and health risk behaviors. Future interventions in dietary modification may turn these findings to advantage by incorporating one common planning protocol to increase the likelihood that good intentions are translated into healthy dietary behavior. PMID:19825172
ERIC Educational Resources Information Center
Sudirman
2017-01-01
This study aims to improve the competence of teachers in preparing a lesson plan through continuous guidance in SMK 1 Mamuju, West Sulawesi province. Action research school is implemented through two cycles to see an increase in the competence of teachers write eleven components in the lesson plan. In the first cycle (first) all Master (twelve)…
Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode
Scheib, Jean P. P.; Stoll, Sarah; Thürmer, J. Lukas; Randerath, Jennifer
2018-01-01
The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively. PMID:29593612
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Stationmore » (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
ITLV.
1999-03-01
The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used inmore » combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. A limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from four of the septic tanks and if radiological field screening levels are exceeded. Additional samples will be analyzed for geotechnical and hydrological properties and a bioassessment may be performed. The technical approach for investigating this Corrective Action Unit consists of the following activities: Perform video surveys of the discharge and outfall lines. Collect samples of material in the septic tanks. Conduct exploratory trenching to locate and inspect subsurface components. Collect subsurface soil samples in areas of the collection system including the septic tanks and outfall end of distribution boxes. Collect subsurface soil samples underlying the leachfield distribution pipes via trenching. Collect surface and near- surface samples near potential locations of the Acid Sewer Outfall if Septic Waste System 5 Leachfield cannot be located. Field screen samples for volatile organic compounds, total petroleum hydrocarbons, and radiological activity. Drill boreholes and collect subsurface soil samples if required. Analyze samples for total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and total petroleum hydrocarbons (oil/ diesel range organics). Limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from particular septic tanks and if radiological field screening levels are exceeded. Collect samples from native soils beneath the distribution system and analyze for geotechnical/ hydrologic parameters. Collect and analyze bioassessment samples at the discretion of the Site Supervisor if total petroleum hydrocarbons exceed field- screening levels.« less
Goal Reconstruction: How Teton Blends Situated Action and Planned Action
1989-11-03
DTIC FILE COPy 00 P 1n GOAL RECONSTRUCTION: HOW TETON BLENDS N SITUATED ACTION AND PLANNED ACTION Technical Report AIP 125 Kurt VanLehn William Ball...distribiikn unlimited. so 08 21 2 GOAL RECONSTRUCTION: HOW TETON BLENDS SITUATED ACTION AND PLANNED ACTION Technical Report AlP 125 Kurt VanLehn William Ball...Architectures for Intelligence. This is the final report on the research supported by the Computer Science Division, Office of Naval Research, under
Ten things to get right for marine conservation planning in the Coral Triangle.
Weeks, Rebecca; Pressey, Robert L; Wilson, Joanne R; Knight, Maurice; Horigue, Vera; Abesamis, Rene A; Acosta, Renerio; Jompa, Jamaluddin
2014-01-01
Systematic conservation planning increasingly underpins the conservation and management of marine and coastal ecosystems worldwide. Amongst other benefits, conservation planning provides transparency in decision-making, efficiency in the use of limited resources, the ability to minimise conflict between diverse objectives, and to guide strategic expansion of local actions to maximise their cumulative impact. The Coral Triangle has long been recognised as a global marine conservation priority, and has been the subject of huge investment in conservation during the last five years through the Coral Triangle Initiative on Coral Reefs, Fisheries and Food Security. Yet conservation planning has had relatively little influence in this region. To explore why this is the case, we identify and discuss 10 challenges that must be resolved if conservation planning is to effectively inform management actions in the Coral Triangle. These are: making conservation planning accessible; integrating with other planning processes; building local capacity for conservation planning; institutionalising conservation planning within governments; integrating plans across governance levels; planning across governance boundaries; planning for multiple tools and objectives; understanding limitations of data; developing better measures of progress and effectiveness; and making a long term commitment. Most important is a conceptual shift from conservation planning undertaken as a project, to planning undertaken as a process, with dedicated financial and human resources committed to long-term engagement.
Ten-year urban forestry action plan
J.W." Jerry" Van Sambeek
2017-01-01
The Ten-year Urban Forestry Action Plan: 2016-2026 was published in September, 2015 (see http://www.urbanforestry.subr.edu/FinalActionPlan_Complete_11_17_15.pdf). This 260 page heavily illustrated document was prepared by the National Urban and Community Forestry Advisory Council (NUCFAC) under leadership and funding from the USDA Forest Service. The Plan's...
77 FR 3975 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Regional Haze
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-26
.... What is the background for EPA's proposed action? A. The Regional Haze Problem B. Requirements of the... is the background for EPA's proposed action? A. The Regional Haze Problem Regional haze is visibility..., to effectively address the problem of visibility impairment in Class I areas, states need to develop...