  1. 24 Command Fire Improvement Action Program Plan

    SciTech Connect

    GRIFFIN, G.B.

    2000-12-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

  2. Flexible and Inexpensive: Improving Learning Transfer and Program Evaluation through Participant Action Plans

    ERIC Educational Resources Information Center

    Cowan, Chris A.; Goldman, Ellen F.; Hook, Melissa

    2010-01-01

    Action plans have been shown to improve transfer of learning and have proven an effective tool in training evaluation. This study describes how action planning was simply and successfully adapted to a preexisting curriculum with few additional resources. The decision to use participant action planning, the administration of it, and the…

  3. An Action Plan for Improving Mediocre or Stagnant Student Achievement

    ERIC Educational Resources Information Center

    Redmond, Kimberley B.

    2013-01-01

    Although all of the schools in the target school system adhere to a school improvement process, achievement scores remain mediocre or stagnant within the overseas school in Italy that serves children of United States armed service members. To address this problem, this study explored the target school's improvement process to discover how…

  4. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  5. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan. Revised

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  6. Action plans for COPD: strategies to manage exacerbations and improve outcomes.

    PubMed

    Jalota, Leena; Jain, Vipul V

    2016-01-01

    COPD is the third-largest killer in the world, and certainly takes a toll on the health care system. Recurrent COPD exacerbations accelerate lung-function decline, worsen mortality, and consume over US$50 billion in health care spending annually. This has led to a tide of payment reforms eliciting interest in strategies reducing preventable COPD exacerbations. In this review, we analyze and discuss the evidence for COPD action plan-based self-management strategies. Although action plans may provide stabilization of acute symptomatology, there are several limitations. These include patient-centered attributes, such as comprehension and adherence, and nonadherence of health care providers to established guidelines. While no single intervention can be expected independently to translate into improved outcomes, structured together within a comprehensive integrated disease-management program, they may provide a robust paradigm. PMID:27330286

  7. Action plans for COPD: strategies to manage exacerbations and improve outcomes

    PubMed Central

    Jalota, Leena; Jain, Vipul V

    2016-01-01

    COPD is the third-largest killer in the world, and certainly takes a toll on the health care system. Recurrent COPD exacerbations accelerate lung-function decline, worsen mortality, and consume over US$50 billion in health care spending annually. This has led to a tide of payment reforms eliciting interest in strategies reducing preventable COPD exacerbations. In this review, we analyze and discuss the evidence for COPD action plan-based self-management strategies. Although action plans may provide stabilization of acute symptomatology, there are several limitations. These include patient-centered attributes, such as comprehension and adherence, and nonadherence of health care providers to established guidelines. While no single intervention can be expected independently to translate into improved outcomes, structured together within a comprehensive integrated disease-management program, they may provide a robust paradigm. PMID:27330286

  8. New York State Board of Regents Action Plan to Improve Elementary and Secondary Education Results in New York.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    This report presents a comprehensive plan to improve teaching and learning in New York State's public and private schools. After surveying school improvement efforts since 1977, characteristics of New York education, and the state Board of Regents' recent goals review, the report states the regents' goals underlying this action plan. These…

  9. Planning as Action Research

    ERIC Educational Resources Information Center

    de Gonzalez, Carmen Beatriz; Hernandez, Teresa; Kusch, Jim; Ryan, Charly

    2004-01-01

    Planning contains so much more than the written plan. Early in 2000, an invitation came from the Collaborative Action Research Network (CARN), to people experienced in action research who might want to help plan and present an action research event for elementary school science teachers in Venezuela, South America, in Autumn 2000. This article…

  10. 3RS action plan

    SciTech Connect

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  11. Affirmative Action Plan for Improvement of Equal Opportunities for Members of Minority Groups, Women, and Physically Handicapped.

    ERIC Educational Resources Information Center

    Black Hawk Coll., Moline, IL.

    This document presents the affirmative action plan developed by Black Hawk College to assure the development and maintenance of educational programs, services, and employment practices that are sensitive to the needs of minorities, women, and the physically handicapped. Part I deals with employment, outlining a specific plan for improving equal…

  12. Improving our legacy: Incorporation of adaptive management into state wildlife action plans

    USGS Publications Warehouse

    Fontaine, J.J.

    2011-01-01

    The loss of biodiversity is a mounting concern, but despite numerous attempts there are few large scale conservation efforts that have proven successful in reversing current declines. Given the challenge of biodiversity conservation, there is a need to develop strategic conservation plans that address species declines even with the inherent uncertainty in managing multiple species in complex environments. In 2002, the State Wildlife Grant program was initiated to fulfill this need, and while not explicitly outlined by Congress follows the fundamental premise of adaptive management, 'Learning by doing'. When action is necessary, but basic biological information and an understanding of appropriate management strategies are lacking, adaptive management enables managers to be proactive in spite of uncertainty. However, regardless of the strengths of adaptive management, the development of an effective adaptive management framework is challenging. In a review of 53 State Wildlife Action Plans, I found a keen awareness by planners that adaptive management was an effective method for addressing biodiversity conservation, but the development and incorporation of explicit adaptive management approaches within each plan remained elusive. Only ???25% of the plans included a framework for how adaptive management would be implemented at the project level within their state. There was, however, considerable support across plans for further development and implementation of adaptive management. By furthering the incorporation of adaptive management principles in conservation plans and explicitly outlining the decision making process, states will be poised to meet the pending challenges to biodiversity conservation. ?? 2010 .

  13. Postpartum Depression Action Plan

    MedlinePlus

    MENU Return to Web version Postpartum Depression | Postpartum Depression Action Plan Patient __________________________ Physician/NP/PA __________________ Clinic ____________________________ Phone Number ____________________ Choose one area and add other areas as you begin to ...

  14. ES H action plan

    SciTech Connect

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  15. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    In order to develop an affirmative action plan at Triton College, the college President appointed a committee made up of nine representatives from the various college constituencies, the majority of which were women and minorities, to determine the objectives to be achieved and how to implement them, and to establish appropriate review procedures.…

  16. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Education, Oklahoma City.

    As mandated by law, this 1983 revision describes the Oklahoma State Department of Education's Affirmative Action Plan and analyzes the employment patterns of the department's work force for that year in light of equal employment opportunity goals. Following a brief policy statement, the development, dissemination, and implementation of the plan…

  17. The Public Health Service action plan to improve access to immunization services. The Interagency Committee to Improve Access to Immunization Services.

    PubMed Central

    1992-01-01

    The Public Health Service's Interagency Committee to Improve Access to Immunization Services (ICI) has responsibility for improving the immunization protection of the nation's children and other vulnerable populations. ICI's Action Plan to Improve Access to Immunization Services sets 14 goals with 120 action steps for improving immunization services nationwide by (a) increasing coordination among Federal health, income, housing, education, and nutrition programs; (b) reducing policy and management barriers that limit access to delivery systems, and (c) strengthening the delivery infrastructure. To accomplish the goals of the plan, there is a $72.0 million increase in funding appropriated in fiscal year 1992 specifically for this purpose. The President's Budget for fiscal year 1993 includes a $24.5 million increase for continued program implementation. The additional resources will be used to address delivery and access problems, which have been determined to be the primary factors limiting immunization for many children. PMID:1594732

  18. Mitigation Action Plan

    SciTech Connect

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  19. Texas Solar Collaboration Action Plan

    SciTech Connect

    Winland, Chris

    2013-02-14

    Texas Solar Collaboration Permitting and Interconenction Process Improvement Action Plan. San Antonio-specific; Investigate feasibility of using electronic signatures; Investigate feasibility of enabling other online permitting processes (e.g., commercial); Assess need for future document management and workflow/notification IT improvements; Update Information Bulletin 153 regarding City requirements and processes for PV; Educate contractors and public on CPS Energy’s new 2013 solar program processes; Continue to discuss “downtown grid” interconnection issues and identify potential solutions; Consider renaming Distributed Energy Resources (DER); and Continue to participate in collaborative actions.

  20. Guam Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  1. Development Planning for School Improvement.

    ERIC Educational Resources Information Center

    Hargreaves, David H., Ed.; Hopkins, David, Ed.

    Development planning has recently become a commonly adopted strategy for school improvement in the United Kingdom. Development planning is a description and more formal explication of the process and actions required to plan and manage change with the intention of improving the school. The chapters in this book report on the "state of the art" of…

  2. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  3. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  4. Fraser River action plan: Introduction

    SciTech Connect

    1998-12-31

    This report reviews the Fraser River Action Plan, intended to foster a co-operative approach to restoring the environmental health of the Fraser watershed. Topics covered include the Plan`s ecosystem approach; the development of a new model of governance, with the goal of creating a body that would take responsibility for the well-being of the watershed; challenges and accomplishments of Plan programs; and future actions now that the Plan has ended. Completed and future programs are briefly reviewed in such areas as aquatic science, pollution, habitat, agriculture and the environment, and effects of forest practices.

  5. What's an Asthma Action Plan?

    MedlinePlus

    ... KidsHealth in the Classroom What Other Parents Are Reading Upsetting News Reports? What to Say Vaccines: Which ... flow meters. Action plans use symptoms, peak flow readings, or both to help you determine the zone ...

  6. Action Understanding as Inverse Planning

    ERIC Educational Resources Information Center

    Baker, Chris L.; Saxe, Rebecca; Tenenbaum, Joshua B.

    2009-01-01

    Humans are adept at inferring the mental states underlying other agents' actions, such as goals, beliefs, desires, emotions and other thoughts. We propose a computational framework based on Bayesian inverse planning for modeling human action understanding. The framework represents an intuitive theory of intentional agents' behavior based on the…

  7. American Samoa Energy Action Plan

    SciTech Connect

    Haase, Scott; Esterly, Sean; Herdrich, David; Bodell, Tim; Visser, Charles

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  8. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  9. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  10. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  11. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  12. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  13. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  14. General chemistry courses that can affect achievement: An action research study in developing a plan to improve undergraduate chemistry courses

    NASA Astrophysics Data System (ADS)

    Shweikeh, Eman

    Over the past 50 years, considerable research has been dedicated to chemistry education. In evaluating principal chemistry courses in higher education, educators have noted the learning process for first-year general chemistry courses may be challenging. The current study investigated perceptions of faculty, students and administrators on chemistry education at three institutions in Southern California. Via action research, the study sought to develop a plan to improve student engagement in general chemistry courses. A mixed method was utilized to analyze different perceptions on key factors determining the level of commitment and engagement in general chemistry education. The approach to chemistry learning from both a faculty and student perspective was examined including good practices, experiences and extent of active participation. The research study considered well-known measures of effective education with an emphasis on two key components: educational practices and student behavior. Institutional culture was inclusively assessed where cognitive expectations of chemistry teaching and learning were communicated. First, the extent in which faculty members are utilizing the "Seven Principles for Good Practice in Undergraduate Education" in their instruction was explored. Second, student attitudes and approaches toward chemistry learning were examined. The focus was on investigating student understanding of the learning process and the structure of chemistry knowledge. The seven categories used to measure students' expectations for learning chemistry were: effort, concepts, math link, reality link, outcome, laboratory, and visualization. This analysis represents the views of 16 faculty and 140 students. The results validated the assertion that students need some competencies and skills to tackle the challenges of the chemistry learning process to deeply engage in learning. A mismatch exists between the expectations of students and those of the faculty

  15. The development of action planning in a joint action context.

    PubMed

    Paulus, Markus

    2016-07-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus. Their task was to hand the experimenter a tool with which she could activate 1 of 2 different effects on the apparatus. The elicitation of each effect required participants to grasp and insert the tool in a particular orientation. We assessed whether participants planned their grasping and reaching action in such a way that it enabled the partner to efficiently handle the tool, that is, anticipating the final end state of the joint activity. We found that 3-year-old children did not adjust their behavior to accommodate the other's action and that they did not increase their performance over multiple trials. Five- and 7-year-old children initially showed a tendency to plan their action in an egocentric manner (i.e., showed a form of egocentrism), but improved their joint action performance over time. Adult participants demonstrated joint action planning from the beginning. Interestingly, 3- and 5-year-old children were able to plan their grasp efficiently when acting alone on the apparatus. Yet, having first-hand experience with the task before acting with a partner did not facilitate performance in the joint action task for younger children. Overall, the study informs current approaches on the psychological basis and ontogenetic origins of joint action in childhood. (PsycINFO Database Record PMID:27337512

  16. One School's Positive Action Plan.

    ERIC Educational Resources Information Center

    McCormack, Sammie

    Because they felt that students can be responsible for their own behavior, the staff of Jefferson Elementary School, serving 300 students in grades 1 through 4 in a small rural community, developed a program which promoted self-management. In September 1979, teachers participated in an assertive discipline workshop. A Positive Action Plan evolved,…

  17. Renormalized action improvements

    SciTech Connect

    Zachos, C.

    1984-01-01

    Finite lattice spacing artifacts are suppressed on the renormalized actions. The renormalized action trajectories of SU(N) lattice gauge theories are considered from the standpoint of the Migdal-Kadanoff approximation. The minor renormalized trajectories which involve representations invariant under the center are discussed and quantified. 17 references.

  18. Hungarian climate change action plan

    SciTech Connect

    Molnar, S.; Takacs, T.; Arpasi, M.; Farago, T.; Palvoelgyi, T.; Harnos, Z.; Lontay, Z.; Somogyi, Z.; Tajthy, T.

    1998-12-31

    In 1994--1996, within the framework of the US Country Studies Program, the Hungarian Country Study Team developed the national greenhouse gas emission inventory, and elaborated the mitigation options for the different sectors of the economy. In 1997, the development of a National Action Plan was begun as the continuation of this work. Results of the inventory study showed that greenhouse gas emissions decreased from the selected base level (i.e., from the yearly average emissions of 1985--1987) until 1994 by cca. 25%. However, this decrease was primarily caused by the deep economic recession. Therefore the policy makers have to face the problem of economic recovery without a relevant increase of greenhouse gas emissions in the near future. This is the main focus of the mitigation analysis and the National Action Plan.

  19. Continual improvement plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    NASA's approach to continual improvement (CI) is a systems-oriented, agency-wide approach that builds on the past accomplishments of NASA Headquarters and its field installations and helps achieve NASA's vision, mission, and values. The NASA of the future will fully use the principles of continual improvement in every aspect of its operations. This NASA CI plan defines a systematic approach and a model for continual improvement throughout NASA, stressing systems integration and optimization. It demonstrates NASA's constancy of purpose for improvement - a consistent vision of NASA as a worldwide leader in top-quality science, technology, and management practices. The CI plan provides the rationale, structures, methods, and steps, and it defines NASA's short term (1-year) objectives for improvement. The CI plan presents the deployment strategies necessary for cascading the goals and objectives throughout the agency. It also provides guidance on implementing continual improvement with participation from top leadership and all levels of employees.

  20. Corrective Action Planning for Environmental Compliance Deficiencies

    SciTech Connect

    Sigmon, C. F.; Ashburn, S. A.; Jolley, R. L.; Smith, A. A.; Mercer, A. E.; Oeulette, B.; Renz, K.; Scott, S.

    1995-01-01

    Effective corrective action planning is one of the cornerstones of an effective environmental management program. Alternatively, ineffective planning can highlight an installation`s unwillingness or inability to effectively address environmental compliance deficiencies. The following paper discusses several guidelines to consider in corrective action planning to ensure that plans benefit rather than harm an installation`s overall environmental management program.

  1. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.220 Section 91.220 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Local Governments; Contents of Consolidated Plan § 91.220 Action plan....

  2. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.320 Section 91.320 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS State Governments; Contents of Consolidated Plan § 91.320 Action plan....

  3. Education for All: National Plan of Action, 2003-2015

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    Background: The Lao People's Democratic Republic (PDR) Education for All National Plan of Action (EFA NPA) for 2003-2015 seeks to accomplish three major tasks: equitable access, improved quality and relevance and strengthened education management. Purpose: To design a National Education For All Action Plan for basic education in Lao PDR which…

  4. Final Consolidated action plan to Tiger Team

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implemenation by Sandia and monitoring by DOE. This volume (2) contains information and corrective action plans pertaining to safety and health and management practices.

  5. 76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... the draft, A Public Health Action Plan to Combat Antimicrobial Resistance (76 FR 14402). Written and... HUMAN SERVICES Centers for Disease Control and Prevention Draft Action Plan--A Public Health Action Plan...), Department of Health and Human Services (DHHS). ACTION: Extension of public comment period. SUMMARY: On...

  6. Final consolidated action plan to Tiger Team

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implementation by Sandia and monitoring by DOE. This volume (I) contains the findings and actions concerning the environment. Tables 4.2 and 4.7 summarize the annual costs estimated for completing the actions. The total costs for completion of all the actions are estimated to be $283 million over a 12 year period; the majority of the actions to be completed and costs incurred in the first five years. Resources are provided from DOE-ER/WM, the DOE/DP landlord funds (one time, physical fixes), and from the Sandia Indirect Budget.

  7. Ten Benefits of Participant Action Planning.

    ERIC Educational Resources Information Center

    Youker, Robert B.

    1985-01-01

    Describes the Participant Action Planning Approach (PAPA) process that requires each trainee to prepare a list of concrete actions or changes he or she plans to make back on the job once the training program is over. Benefits of PAPA are discussed, including transfer of learning, verbalization, and commitment. (CT)

  8. NORTH AMERICAN REGIONAL ACTION PLAN ON MERCURY

    EPA Science Inventory

    The North American Regional Action Plan (NARAP) on Mercury is one of a number of action plans that stem from the North American Agreement on Environmental Cooperation between the governments of Canada, Mexico and the United States. That Agreement established the Commission for En...

  9. Exploiting map plans as resources for action

    NASA Technical Reports Server (NTRS)

    Payton, David

    1989-01-01

    When plans are used as programs for controlling the action of autonomous or teleoperated robots, their abstract representation can easily obscure a great deal of the critical knowledge that originally led to the planned course of action. An autonomous vehicle experiment is highlighted which illustrates how the information barriers created by abstraction can result in undesirable action. It is then shown how the same task can be performed correctly using plans as a resource for action. As a result of this simple change in outlook, problems requiring opportunistic reaction to unexpected changes in the environment can be solved.

  10. Planning actions in robot automated operations

    NASA Technical Reports Server (NTRS)

    Das, A.

    1988-01-01

    Action planning in robot automated operations requires intelligent task level programming. Invoking intelligence necessiates a typical blackboard based architecture, where, a plan is a vector between the start frame and the goal frame. This vector is composed of partially ordered bases. A partial ordering of bases presents good and bad sides in action planning. Partial ordering demands the use of a temporal data base management system.

  11. The Development of Action Planning in a Joint Action Context

    ERIC Educational Resources Information Center

    Paulus, Markus

    2016-01-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus.…

  12. The Effectiveness of Written Action Plans in Atopic Dermatitis.

    PubMed

    Sauder, Maxwell B; McEvoy, Alana; Sampson, Margaret; Kanigsberg, Nordau; Vaillancourt, Regis; Ramien, Michele L; Zemek, Roger

    2016-03-01

    Atopic dermatitis (AD) is a chronic dermatosis requiring a stepwise and dynamic approach to management. The use of written action plans has been shown to improve outcomes in other chronic diseases that require a similar incremental approach. A systematic review was performed to evaluate the effect of a written eczema action plan (EAP) in AD management and to identify characteristics of effective action plans in children with eczema. Only two trials were identified as eligible, which highlights the need for more research on EAPs. PMID:26776967

  13. 29 CFR 30.4 - Affirmative action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 1 2014-07-01 2013-07-01 true Affirmative action plans. 30.4 Section 30.4 Labor Office of... action plans. (a) Adoption of affirmative action plans. A sponsor's commitment to equal opportunity in... affirmative action plan. (b) Definition of affirmative action. Affirmative action is not mere...

  14. 29 CFR 30.4 - Affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 1 2013-07-01 2013-07-01 false Affirmative action plans. 30.4 Section 30.4 Labor Office of... action plans. (a) Adoption of affirmative action plans. A sponsor's commitment to equal opportunity in... affirmative action plan. (b) Definition of affirmative action. Affirmative action is not mere...

  15. 29 CFR 30.4 - Affirmative action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Affirmative action plans. 30.4 Section 30.4 Labor Office of... action plans. (a) Adoption of affirmative action plans. A sponsor's commitment to equal opportunity in... affirmative action plan. (b) Definition of affirmative action. Affirmative action is not mere...

  16. The Climate Change Action Plan: Technical supplement

    SciTech Connect

    Not Available

    1994-03-01

    This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

  17. National Security Technology Incubator Action Plan

    SciTech Connect

    2008-02-28

    This report documents the action plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). This action plan serves as a tool in measuring progress in the development process and delivery of services for the NSTI program. Continuous review and evaluation of the action plan is necessary in the development process of the NSTI. The action plan includes detailed steps in developing the NSTI program based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Included are tasks required to implement the NSTI, developed within a work breakdown structure. In addition, a timeline is identified for each task.

  18. Action planning in a virtual context after prefrontal cortex damage.

    PubMed

    Zalla, T; Plassiart, C; Pillon, B; Grafman, J; Sirigu, A

    2001-01-01

    Patients with frontal lobe lesions are known to encounter severe problems in the organisation of their behaviour in everyday life. Script generation tasks assess the subject's conceptual ability to formulate and evaluate a coherent and structured plan of action. In the present study, we investigated to what extent neuropsychological deficits observed at the conceptual level of action knowledge lead to impairments in action execution. We examined seven patients with prefrontal cortex damage and sixteen normal subjects. Subjects were first asked to verbally formulate a plan of action and then to use this knowledge for 'executing' the actions in a virtual 3-dimensional interactive apartment presented on a computer screen. The results indicated that the presence of the realistic context improved patients' performance. However, specific impairments were observed in patients in the execution condition, namely actions slips, omissions, failure in initiating actions and purposeless displacements. Moreover, an analysis of planning time showed that, differently of the patients group, normal subjects spent more time during plan execution as compared to plan generation. These results suggest that after a frontal lobe lesion a defective formulation of a routine plan might affect the execution of the corresponding course of actions. PMID:11369400

  19. Gathering Strength: Canada's Aboriginal Action Plan.

    ERIC Educational Resources Information Center

    Department of Indian Affairs and Northern Development, Ottawa (Ontario).

    Designed to renew the relationship between the Canadian government and the Aboriginal peoples of Canada, this action plan contains a statement of reconciliation, a statement of renewal, and four key objectives for action. First, renewing partnerships includes community-based healing to address the negative effects of the residential schools…

  20. SOCIAL ACTION AND INTERACTION IN PROGRAM PLANNING.

    ERIC Educational Resources Information Center

    BEAL, GEORGE M.; AND OTHERS

    TWO RESEARCH FRAMEWORKS, SOCIAL ACTION AND GROUP FORMATION AND MAINTENANCE, WERE CHOSEN TO ANALYZE THE EFFECTIVENESS OF COMMUNICATION STRATEGIES EMPLOYED BY EXTENSION WORKERS. IN A STUDY ON THE INTRODUCTION OF PROGRAM PLANNING INTO A COUNTY, THE FULFILLMENT OF EACH OF 34 STEPS IN THE SOCIAL ACTION PROCESS WAS ANALYZED AND FOUND TO BE ONLY SOMEWHAT…

  1. Addressing Youth Victimization. Action Plan Update.

    ERIC Educational Resources Information Center

    Osofsky, Joy D.

    The Coordinating Council on Juvenile Justice and Delinquency Prevention published an action plan in 1996 that established eight objectives as the foundation for innovative and effective action by federal, state, and local governments, in partnership with private sector organizations, to reduce juvenile violence and victimization. This bulletin…

  2. Improving Learning and Teaching through Action Learning and Action Research.

    ERIC Educational Resources Information Center

    Zuber-Skeriit, Ortrun

    1993-01-01

    A theoretical framework for action learning and action research is presented, as a basis for better understanding college instruction and learning. Action research is viewed as a philosophy, theory of learning, research methodology, and teaching technique. It is argued that action research both increases knowledge and improves teaching.…

  3. Action Planning and Recording Achievement.

    ERIC Educational Resources Information Center

    Green, Muriel

    This document examines strategies and procedures that British further education (FE) colleges can use to develop and enhance systems and structures for guiding and supporting learners and learning. It is based on the findings of a field test of the Managing Learning model for planning and recording the process of FE students. First, the importance…

  4. Affirmative Action Plan. Fourth Edition.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    The aim of this plan is to provide the reader with an outline of the New York State Education Department's commitment to equal employment opportunity and its obligation to comply with various anti-discrimination laws. These laws include the New York State Human Rights Law, the Federal Equal Employment Opportunity Act of 1972, Section 504 of the…

  5. Individual Action Planning: A Practical Guide.

    ERIC Educational Resources Information Center

    Squirrell, Gillian

    This book, which is intended as a practical guide for British teachers and tutors involved in career guidance, explains the process of helping students develop Individual Action Plans (IAPs). IAPs are plans outlining individual personal, vocational, and educational aspirations that students develop in a series of discussion sessions with an…

  6. Ensuring preparedness: Testing an emergency action plan

    SciTech Connect

    Gibson, J.Z.; Hildebrand, L.G. )

    1992-12-01

    For dam owners, having a plan for responding to dam failure is not enough. To ensure that operating personnel and local authorities and emergency response agencies are prepared, the plan needs to be tested periodically. This article describes how Washington Water Power tested its emergency action plan at its Cabinet Gorge project in September, 1990. The objectives, details, and critique of the test are described, as is FERC's five-level exercise testing program.

  7. Remedial action planning for Trench 1

    SciTech Connect

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.

    1998-07-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

  8. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    SciTech Connect

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  9. ICDF Complex Remedial Action Work Plan

    SciTech Connect

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  10. Final Action Plan to Tiger Team

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  11. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Affirmative action plan standards. 152.409... action plan standards. (a) Each affirmative action plan required by this subpart shall be developed in... ethnic group with the highest selection rate. (b) Each affirmative action plan required by this...

  12. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Affirmative action plan standards. 152.409... action plan standards. (a) Each affirmative action plan required by this subpart shall be developed in... ethnic group with the highest selection rate. (b) Each affirmative action plan required by this...

  13. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Affirmative action plan standards. 152.409... action plan standards. (a) Each affirmative action plan required by this subpart shall be developed in... ethnic group with the highest selection rate. (b) Each affirmative action plan required by this...

  14. 7 CFR 275.16 - Corrective action planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which:...

  15. Emergency Action Plans in Physical Education

    ERIC Educational Resources Information Center

    Tanis, Cindy J.; Hebel, Susan L.

    2016-01-01

    Emergency Action Plans (EAP) are essential to properly manage injuries and illnesses in physical education and sport. However, most literature discusses EAP's in the athletic arena instead of physical education. The purpose of this study was to examine physical education instructors' experiences of student illness and injury, discuss the steps of…

  16. Triton College Faculty Recruitment Action Plan (FRAP).

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    Triton College's (Illinois) Faculty Recruitment Action Plan (FRAP) provides a detailed guide to hiring new faculty, focusing on the desired characteristics of new faculty; marketing and recruitment strategies; employment incentives; the application, interviewing, and selection process; new faculty orientation; a timeline for implementation; cost…

  17. Action Plan for Florida's Public Libraries. Addendum.

    ERIC Educational Resources Information Center

    Florida Library Study Commission, Tallahassee.

    The introduction to this addendum (the Action Plan is LI 004 521) discusses the present use by libraries of information-handling technology and identifies some of the trends taking place in performing essential library services. While some limited inroads have been made in automating certain public library functions, the bulk of services is still…

  18. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... for recreation use, derelict and other public lands not designated for recreation; and...

  19. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... for recreation use, derelict and other public lands not designated for recreation; and...

  20. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 13471; 3 CFR, 1984 Comp., p. 193). (b) In this connection, and concurrently with the war or national... 47 Telecommunication 5 2012-10-01 2012-10-01 false Planned actions. 214.4 Section 214.4 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL PROCEDURES FOR THE USE...

  1. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 13471; 3 CFR, 1984 Comp., p. 193). (b) In this connection, and concurrently with the war or national... 47 Telecommunication 5 2014-10-01 2014-10-01 false Planned actions. 214.4 Section 214.4 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL PROCEDURES FOR THE USE...

  2. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 13471; 3 CFR, 1984 Comp., p. 193). (b) In this connection, and concurrently with the war or national... 47 Telecommunication 5 2011-10-01 2011-10-01 false Planned actions. 214.4 Section 214.4 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL PROCEDURES FOR THE USE...

  3. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 13471; 3 CFR, 1984 Comp., p. 193). (b) In this connection, and concurrently with the war or national... 47 Telecommunication 5 2013-10-01 2013-10-01 false Planned actions. 214.4 Section 214.4 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL PROCEDURES FOR THE USE...

  4. Housekeeping category corrective action unit work plan

    SciTech Connect

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  5. Action plan for the Tiger Team assessment report

    SciTech Connect

    Not Available

    1990-08-30

    This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

  6. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  7. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  8. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  9. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  10. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  11. The WHO's action plan for oral health.

    PubMed

    Monajem, S

    2009-02-01

    The oral health action plan, recommended for adoption to the Sixtieth World Health Assembly of the World Health Organization in January 2007, included many of the necessary components. Had fissure sealants been added to the list of prevention methods and the roles of dental educational institutions and hygiene community better clarified, the action plan would have made a more viable and realistic package for the ministries and their directors of national programmes receiving the support of the World Health Organization and partners. Sealants remain under-utilized, few dental hygienists are integrated in the primary oral health team and fewer dental graduates have had service-learning experiences--all contradictory to the evidence in the literature. Translating research findings into public health action programmes is one of the recommendations made in the action plan and one way we can begin this is by implementing sealant programmes in 'Health Promoting Schools' that are WHO's brain child and borne of the wisdom of using schools as 'platforms' for the promotion and delivery of health care to the community. PMID:19215314

  12. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Establishing affirmative action plans. 1608.4 Section 1608... AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.4 Establishing affirmative action plans. An affirmative action plan or program under this section shall...

  13. 76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ..., Prevention and Control, Research, and Product Development. The Action Plan contains specific action items... Healthcare Research and Quality (AHRQ), the Centers for Medicare and Medicaid Services (CMS), the Health.... Tanja Popovic, Deputy Associate Director for Science, Centers for Disease Control and...

  14. National Biofuels Action Plan, October 2008

    SciTech Connect

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  15. Fraser River action plan: Aquatic science

    SciTech Connect

    1998-12-31

    Reviews research carried out under the Fraser River Action Plan in the field of aquatic science, beginning with research carried out on Fraser River headwater lakes and the contaminants found in those lakes and their fish. Subsequent sections cover research on sediment and contaminant transport, benthic communities, fish species distribution, contaminants in fish, pollution sources (from urban runoff, agriculture, and forestry), pollution in the Fraser estuary, and environmental indicators.

  16. Fraser River action plan: Forest industries

    SciTech Connect

    1998-12-31

    This research reviews the activities conducted under the Fraser River Action Plan with regard to forest industries and their effects on the Fraser River Basin environment. The review covers the following topics: Projects to cut pollution from wood preservatives and pulp/paper mills; ecological effects of pulp mill effluents; wood waste and its utilization; habitat conservation; environmentally sound forestry practices; riparian conservation; habitat and ecosystem protection; and the use of economic instruments as an alternative to regulation.

  17. Numerical Tests of the Improved Fermilab Action

    SciTech Connect

    Detar, C.; Kronfeld, A.S.; Oktay, M.B.

    2010-11-01

    Recently, the Fermilab heavy-quark action was extended to include dimension-six and -seven operators in order to reduce the discretization errors. In this talk, we present results of the first numerical simulations with this action (the OK action), where we study the masses of the quarkonium and heavy-light systems. We calculate combinations of masses designed to test improvement and compare results obtained with the OK action to their counterparts obtained with the clover action. Our preliminary results show a clear improvement.

  18. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  19. Smart Buildings: Business Case and Action Plan

    SciTech Connect

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  20. A School Action Plan with Stakeholder Involvement: A Case Study of One Elementary School

    ERIC Educational Resources Information Center

    Getty, Jacob J., Jr.

    2011-01-01

    This case study focused on a school action plan, using a planning and implementation process that focused on improving stakeholder involvement and responsibility for student reading achievement at Eisenberg Elementary School. This study examined the impact of the school action process on the development of a new plan compared to other traditional…

  1. Software Engineering Improvement Plan

    NASA Technical Reports Server (NTRS)

    2006-01-01

    In performance of this task order, bd Systems personnel provided support to the Flight Software Branch and the Software Working Group through multiple tasks related to software engineering improvement and to activities of the independent Technical Authority (iTA) Discipline Technical Warrant Holder (DTWH) for software engineering. To ensure that the products, comments, and recommendations complied with customer requirements and the statement of work, bd Systems personnel maintained close coordination with the customer. These personnel performed work in areas such as update of agency requirements and directives database, software effort estimation, software problem reports, a web-based process asset library, miscellaneous documentation review, software system requirements, issue tracking software survey, systems engineering NPR, and project-related reviews. This report contains a summary of the work performed and the accomplishments in each of these areas.

  2. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    USGS Publications Warehouse

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  3. Playing Action Video Games Improves Visuomotor Control.

    PubMed

    Li, Li; Chen, Rongrong; Chen, Jing

    2016-08-01

    Can playing action video games improve visuomotor control? If so, can these games be used in training people to perform daily visuomotor-control tasks, such as driving? We found that action gamers have better lane-keeping and visuomotor-control skills than do non-action gamers. We then trained non-action gamers with action or nonaction video games. After they played a driving or first-person-shooter video game for 5 or 10 hr, their visuomotor control improved significantly. In contrast, non-action gamers showed no such improvement after they played a nonaction video game. Our model-driven analysis revealed that although different action video games have different effects on the sensorimotor system underlying visuomotor control, action gaming in general improves the responsiveness of the sensorimotor system to input error signals. The findings support a causal link between action gaming (for as little as 5 hr) and enhancement in visuomotor control, and suggest that action video games can be beneficial training tools for driving. PMID:27485132

  4. 24 CFR 248.217 - Revisions to plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AUTHORITIES PREPAYMENT OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income Preservation Act of 1987 § 248.217 Revisions to plan of action. The owner may from time to...

  5. Improving maternity care in the Dominican Republic: a pilot study of a community-based participatory research action plan by an international healthcare team.

    PubMed

    Foster, Jennifer; Gossett, Sarah; Burgos, Rosa; Cáceres, Ramona; Tejada, Carmen; Dominguez García, Luis; Ambrosio Rosario, Angel; Almonte, Asela; Perez, Lydia J

    2015-05-01

    This article is a report of the process and results of a feasibility pilot study to improve the quality of maternity care in a sample of 31 women and their newborns delivering in a public, tertiary hospital in the Dominican Republic. The pilot study was the first "action step" taken as a result of a formative, community-based participatory research (CBPR) study conducted between 2008 and 2010 by an interdisciplinary, international partnership of U.S. academic researchers, Dominican medical/nursing personnel, and Dominican community health workers. Health personnel and community health workers separately identified indicators most important to measure quality of antepartum maternity care: laboratory and diagnostic studies and respectful, interpersonal communication. At the midpoint and the completion of data collection, the CBPR team evaluated the change in quality indicators to assess improvement in care. The pilot study supports the idea that joint engagement of community health workers, health personnel, and academic researchers with data creation and patient monitoring is motivating for all to continue to improve services in the cultural context of the Dominican Republic. PMID:24793488

  6. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Affirmative action plans. 34.8 Section 34..., applicants or recipients shall have an acceptable affirmative action plan which has been approved by the... paragraph (c) of this section. The affirmative action plan must set forth overall goals and timetables...

  7. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  8. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  9. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  10. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  11. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  12. Building air quality: Action plan, June 1998

    SciTech Connect

    1998-11-01

    To promote the use of these straightforward practices to improve IAQ, EPA and other leaders in the IAQ field developed this 8-step plan. This additional resource meets the needs of building owners and managers who want an easy-to-understand path for taking their building from current conditions and practices to the successful institutionalization of good IAQ management practices.

  13. Action Planning: Rowing in the Same Direction

    ERIC Educational Resources Information Center

    Hewson, Kurtis; Adrian, Lorna

    2008-01-01

    Two years ago, as Claresholm Elementary School prepared for a new year with a new principal, it had the usual shopping list of ambitions--focus on student learning, support the staff, empower parents, and more. However, in examining the school's improvement plan it became apparent that the school staff had a unique opportunity to develop solid…

  14. 29 CFR 30.4 - Affirmative action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... these regulations, sponsors are expected to make appropriate adjustments in goal levels. See 29 CFR 30.8... affirmative action plan. (b) Definition of affirmative action. Affirmative action is not mere passive... affirmative action plan must also include adequate provision for outreach and positive recruitment that...

  15. Fraser River action plan: Urban issues

    SciTech Connect

    1998-12-31

    This report reviews the state of the environment around urban areas on the Fraser River watershed and Fraser River Action Plan activities as they relate to minimizing the effect of urban areas on the environment. Subjects covered include the effect of cities on the environment; signs of urban stress; the importance of urban runoff as a pollution source, with a case study of the Brunette River watershed; sewage treatment and water conservation; non-point sources of pollution and management practices; recycling; contaminated sites; air quality and its management; habitat protection; and wood waste as a potential resource.

  16. Affirmative Action Plan, October 1991--September 1992

    SciTech Connect

    Not Available

    1991-10-01

    This report documents Reynolds Electrical Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the Handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations. All personnel decisions are made at the Company level. Decisions regarding the General Manager or Deputy General Manager are made at the corporate level.

  17. Improved and perfect actions in discrete gravity

    SciTech Connect

    Bahr, Benjamin; Dittrich, Bianca

    2009-12-15

    We consider the notion of improved and perfect actions within Regge calculus. These actions are constructed in such a way that they - although being defined on a triangulation - reproduce the continuum dynamics exactly, and therefore capture the gauge symmetries of general relativity. We construct the perfect action in three dimensions with a cosmological constant, and in four dimensions for one simplex. We conclude with a discussion about Regge calculus with curved simplices, which arises naturally in this context.

  18. 77 FR 38296 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... HUMAN SERVICES Centers for Disease Control and Prevention Draft Public Health Action Plan--A National Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... Federal Register requesting public comment on the draft National Public Health Action Plan for...

  19. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... HUMAN SERVICES Centers for Disease Control and Prevention Draft Public Health Action Plan--A National Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... requesting public comment on the draft National Public Health Action Plan for the Detection, Prevention,...

  20. Improved resource use decisions and actions through remote sensing

    NASA Technical Reports Server (NTRS)

    Hill-Rowley, R.; Boylan, M.; Enslin, W.; Vlasin, R. D.

    1975-01-01

    Operational uses of remote sensing for improving management decisions and actions concerning resource uses are considered in terms of first generation, or direct-action; and second generation or indirect, delayed-action applications. From among applications completed during 1974-75, seven case studies are offered in illustration of the many contrasts which can be drawn between first and second generation application studies. These include: (1) multi-agency river basin planning; (2) corridor assessment and route location for highway location together with improvement of county-level planning decisions; (3) improving timber management practices; (4) enforcement of new state statutes; (5) county-wide open space preservation; (6) land value reappraisal relative to property tax equalization; and (7) optimizing agri-business processing plant locations.

  1. SADC establishes a regional action plan.

    PubMed

    Klouda, T

    1997-02-01

    The regional meeting held on AIDS strategy in Lilongwe, Malawi, in December, 1996, made important advances. The 12 countries of the SADC (Southern Africa Development Community) joined the European Union to institute a regional action plan for the reduction of susceptibility of people to HIV because of social, cultural, and environmental factors; the vulnerability of people with HIV infection to social and other difficulties; and the vulnerability of institutions because of the foregoing impacts. At the conference the issues explored were employment, mining, medical drugs, education, and tourism. An employment charter was seen as crucial for the success of AIDS and workplace activities. Facilitation of travel across borders was important for the reduction of susceptibility to HIV infection. Enhancement of regional policies for essential drugs was vital for drugs for the treatment of AIDS. The clarification of the regional role was critical for regional support of national action (strengthening technical and institutional capacities) and for regional joint action such as studies on research, harmonization of data collection on HIV/AIDS; organization of training; development of information and education on HIV/AIDS; facilitation of manufacturing of drugs and condoms; and the development of a regional information and education program about HIV/AIDS. The conference also clarified HIV/AIDS programs in relation to other health and socioeconomic problems. PMID:12292055

  2. Clean slate corrective action investigation plan

    SciTech Connect

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

  3. Professional Improvement Plans in Science.

    ERIC Educational Resources Information Center

    Sousa, David A., Comp.; And Others

    In 1982 the New Jersey Science Supervisors Association asked its members to submit samples of Professional Improvement Plans (PIPS) that they had developed for themselves as well as for their science teachers. Provided in this document, in chart format, are actual PIPS used by classroom teachers and science supervisors. The PIPS are divided into…

  4. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 543: LIQUID DISPOSAL UNITS, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2006-09-01

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved Corrective Action Decision Document.

  5. 78 FR 42071 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance... the public comment period for the proposed guidance ``PAG Manual: Protective Action Guides (PAGs)...

  6. The Work Compatibility Improvement Framework: theory and application of improvement action and intervention strategies.

    PubMed

    Genaidy, Ash M; Rinder, Magda M; Sequeira, Reynold; A-Rehim, Amal D

    2009-05-01

    Challenges facing management of manufacturing firms can be transformed into asset gains by giving careful consideration to the worker-work environment interface. The benefits of a 'healthy' interface may lead to sizable reductions in rising health care costs and retention of highly qualified workers. This paper presents a novel approach for the 'improve' phase of the Work Compatibility Improvement Framework. The work tasks of this research consisted of: (a) fundamentals of cognitive-based improvement action and intervention; (b) design concepts and process of improvement action/intervention generation; (c) assessment model of estimated gains in company's assets; (d) application demonstration in the manufacturing sector. The process of improvement action/intervention generation is described, preceded by a description of the fundamentals of cognitive-based improvement action and intervention and system architecture. This is followed by a documentation of estimated asset gains as a result of the improvement plan. The results showed that expert workers were, on average, 78% in agreement with the algorithm-identified improvement actions. Their knowledge was used to update the recommended actions as well as to detail the multiple strategies required to address the improvement actions. As a result, an integrated improvement plan was developed resulting in estimated asset gains of $1.6 million, which was validated by the general manager. The research reported herein documented the theory and application of the 'improve' phase of the Work Compatibility Improvement Framework. The economic assessment of the suggested improvement is also reported and this has proved to be an important driver to secure the firm collaboration of manufacturing enterprise management. An integrated improvement solution plan backed by a detailed economic assessment of suggested improvements is essential to demonstrate the full potential of workplace micro- and macro-ergonomic interventions. PMID

  7. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true Formulation of...

  8. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Formulation of...

  9. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false Formulation of...

  10. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Formulation of...

  11. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Administration of affirmative action plan. 906.5 Section 906.5 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer...

  12. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Formulation of affirmative action plan. 906.4 Section 906.4 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer,...

  13. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Emergency action plans. 1917.30 Section 1917.30 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency action plans—(1) Scope and...

  14. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1917.30 Section 1917.30 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency action plans—(1) Scope and...

  15. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Emergency action plans. 1917.30 Section 1917.30 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency action plans—(1) Scope and...

  16. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  17. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  18. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  19. Final Consolidated action plan to Tiger Team. Volume 2

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implemenation by Sandia and monitoring by DOE. This volume (2) contains information and corrective action plans pertaining to safety and health and management practices.

  20. LP Daac Product Lifecyle Plan in Action

    NASA Astrophysics Data System (ADS)

    Bennett, S. D.

    2014-12-01

    The Land Processes Distributed Active Archive Center (LP DAAC) is a NASA Earth Observing System (EOS) Data and Information System (EOSDIS) DAAC that supports selected EOS Community non-standard data products such as the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) Global Emissivity Database (GED), and also supports NASA Earth Science programs such as Making Earth System Data Records for Use in Research Environments (MEaSUREs) to contribute in providing long-term, consistent, and mature data products. To support and deliver excellence for NASA data stewardship, and to accommodate long-tail data preservation with Community and MEaSUREs products, the LP DAAC introduces a Product Lifecycle Plan that features a phased project framework to facilitate long-term product preservation. The first phase, Inception, captures all artifacts applied by the Product Developer(s) and develops Earth Science Data Records based on product artifacts. The second phase, Active Archive, distributes, promotes and provides services for the matured products to the science community. The third and final phase, Long-term Archive, establishes a permanent preservation location for all project artifacts. This poster depicts the LP DAAC Product Lifecycle Plan in action using the LP DAAC recently released NASA WELD Version 1.5 artifacts and phased objectives.

  1. The Olympia Proceedings. Section VI: Analysis of the Action Plans.

    ERIC Educational Resources Information Center

    Meyers, Joel; And Others

    1982-01-01

    Within legislative, practice, and professional issues in school psychology, examples of action plans for hypothetical events are presented. These were produced by groups of conference participants to stimulate development of detailed plans for local, state and national use by school psychologists. Action plan resources and implementation and…

  2. On the Inclusion of Externally Controlled Actions in Action Planning

    ERIC Educational Resources Information Center

    Tsai, Jessica Chia-Chin; Knoblich, Gunther; Sebanz, Natalie

    2011-01-01

    According to ideomotor theories, perceiving action effects produced by others triggers corresponding action representations in the observer. We tested whether this principle extends to actions performed by externally controlled limbs and tools. Participants performed a go-no-go version of a spatial compatibility task in which their own actions…

  3. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... under 24 CFR part 970); (5) Five-year action plan. (i) General. The comprehensive plan shall include a... entities are set up to plan and implement the consolidated plans (under 24 CFR part 91), the PHA shall...-year action plan). 968.315 Section 968.315 Housing and Urban Development REGULATIONS RELATING...

  4. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... under 24 CFR part 970); (5) Five-year action plan. (i) General. The comprehensive plan shall include a... entities are set up to plan and implement the consolidated plans (under 24 CFR part 91), the PHA shall...-year action plan). 968.315 Section 968.315 Housing and Urban Development REGULATIONS RELATING...

  5. Smoking cessation in cardiac patients: the influence of action plans, coping plans and self-efficacy on quitting smoking.

    PubMed

    de Hoog, Natascha; Bolman, Catherine; Berndt, Nadine; Kers, Esther; Mudde, Aart; de Vries, Hein; Lechner, Lilian

    2016-06-01

    Smoking cessation is the most effective action for cardiac patients who smoke to improve their prognosis, yet more than one-half of cardiac patients continue to smoke after hospital admission. This study examined the influence of action plans, coping plans and self-efficacy on intention to quit and smoking cessation in cardiac patients. Cardiac patients completed a baseline questionnaire (N = 245) assessing demographic characteristics, smoking behavior, intention, self-efficacy, relapse self-efficacy and action and coping plans. Six months later (N = 184) continued abstinence from smoking was assessed. Self-efficacy predicted intention to quit smoking and was an indirect predictor of continued abstinence, through intention. Intention to quit smoking and making action plans both directly influenced continued abstinence. Future interventions to facilitate smoking cessation in cardiac patients should put strong emphasis on enhancing self-efficacy and on making specific action plans to increase the likelihood of smoking cessation. PMID:26827369

  6. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  7. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  8. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  9. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  10. Hazardous Waste Remedial Actions Program: Remedial Actions Planning Program Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1989-04-01

    The purpose of this Plan is to describe the quality assurance (QA) requirements for the RAP Program by identifying the quality elements to be controlled and specifying how they will be controlled. The activities for which control elements will be identified include those relating to: preparation, review, and approval of plans, reports, and studies; execution of field and analytical work by subcontractors and other agents; control of subcontractors and other agents during other phases of work; and actions internal to the RAP Program to ensure proper execution of projects.

  11. Improving Plan Quality in SAT-Based Planning

    NASA Astrophysics Data System (ADS)

    Giunchiglia, Enrico; Maratea, Marco

    Planning as Satisfiability (SAT) is the best approach for optimally (wrt makespan) solving classical planning problems. SAT-based planners, like SATPLAN, can thus return plans having minimal makespan guaranteed. However, the returned plan does not take into account plan quality issues introduced in the last two International Planning Competitions (IPCs): such issues include minimal-actions plans and plans with "soft" goals, where a metric has to be optimized over actions/goals. Recently, an approach to address such issues has been presented, in the framework of planning as satisfiability with preferences: by modifying the heuristic of the underlying SAT solver, the related system (called SATPLAN(P)) is guaranteed to return plans with minimal number of actions, or with maximal number of soft goals satisfied. But, besides such feature, it is well-known that introducing ordering in SAT heuristics can lead to significant degradation in performances. In this paper, we present a generate-and-test approach to tackle the problem of dealing with such optimization issues: without imposing any ordering, a (candidate optimal) plan is first generated, and then a constraint is added imposing that the new plan (if any) has to be "better" than the last computed, i.e., the plan quality is increased at each iteration. We implemented this idea in SATPLAN, and compared the resulting systems wrt SATPLAN(P) and SGPlan on planning problems coming from IPCs. The analysis shows performance benefits for the new approach, in particular on planning problems with many preferences.

  12. ORD Strategic Action Plan for Information Management / Information Technology 2011

    EPA Science Inventory

    ORD's Strategic Action Plan for IM/IT (2011) was collaboratively developed with input from ORD research and administrative personnel. It identifies actions necessary to support ORD's priority IM and IT needs.

  13. 23 CFR 1200.25 - Improvement plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Improvement plan. 1200.25 Section 1200.25 Highways... Implementation and Management of the Highway Safety Program § 1200.25 Improvement plan. If a review of the Annual... improvement plan. This plan will detail strategies, program activities, and funding targets to meet...

  14. Action planning in typically and atypically developing children (unilateral cerebral palsy).

    PubMed

    Crajé, Céline; Aarts, Pauline; Nijhuis-van der Sanden, Maria; Steenbergen, Bert

    2010-01-01

    In the present study, we investigated the development of action planning in children with unilateral Cerebral Palsy (CP, aged 3-6 years, n=24) and an age matched control group. To investigate action planning, participants performed a sequential movement task. They had to grasp an object (a wooden play sword) and place the sword in a hole in a wooden block. Our main dependent variable was the grip type that participants used, i.e., did they adapt their initial grip choice such that they would reach a comfortable posture at the end of the action? This end-state comfort effect has been abundantly shown in research on action planning, and is taken as evidence for anticipatory planning. The first aim of the study was to investigate the development of action planning in the unilateral CP group and the control group. Our hypothesis was that action planning improves with age in the control group, but not in the unilateral CP group. The results showed that planning was impaired in the unilateral CP group compared with the control group. Consistent with our hypothesis, we found an age effect in the control group, but not in the unilateral CP group. In the control group 5 and 6 years olds showed more anticipatory planning compared with the 3 and 4 years olds. The second aim of this study was to examine whether an intervention for children with unilateral CP (i.e., constrained induced movement therapy combined with bimanual training) affected action planning. The children with unilateral CP were therefore measured on the experimental task before and after an 8-week intervention period. The results showed that planning improved after the intervention. This finding suggests that action planning ability in young children with unilateral CP may be sensitive to improvement. These findings are discussed within the context of typical and atypical development of action planning and further guidelines for intervention in children with unilateral CP are given. PMID:20451346

  15. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implementation by Sandia and monitoring by DOE. This volume (I) contains the findings and actions concerning the environment. Tables 4.2 and 4.7 summarize the annual costs estimated for completing the actions. The total costs for completion of all the actions are estimated to be $283 million over a 12 year period; the majority of the actions to be completed and costs incurred in the first five years. Resources are provided from DOE-ER/WM, the DOE/DP landlord funds (one time, physical fixes), and from the Sandia Indirect Budget.

  16. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    SciTech Connect

    Bond, Alan; Cave, Ben; Ballantyne, Rob

    2013-09-15

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ► Health professionals have limited aspirations for health improvement through the planning system. ► Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ► SEA and HIA currently do not embed health consideration in planning decisions. ► The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA.

  17. Action Research: Improving Graduate-Level Writing

    ERIC Educational Resources Information Center

    Carter, Nari

    2012-01-01

    I am a doctoral student enrolled in an educational research program. While completing an action research course, I conducted research to improve my academic writing and to develop skills for formulating arguments about educational issues. From this research I developed an appreciation for and an understanding of good writing habits and elements of…

  18. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or...

  19. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or...

  20. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or...

  1. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or...

  2. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d)...

  3. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Affirmative action plan: General. 152.407 Section 152.407 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Nondiscrimination in Airport Aid Program § 152.407 Affirmative action plan: General. (a) Except as provided...

  4. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Affirmative action plans. 34.8 Section 34.8 Public Lands: Interior Office of the Secretary of the Interior REQUIREMENTS FOR EQUAL OPPORTUNITY DURING CONSTRUCTION AND OPERATION OF THE ALASKA NATURAL GAS TRANSPORTATION SYSTEM § 34.8 Affirmative action plans. (a)(1) Within one hundred...

  5. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative...

  6. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Nondiscrimination in Airport Aid Program § 152.409 Affirmative action plan standards. (a) Each...

  7. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Affirmative action plans. 34.8 Section 34.8 Public Lands: Interior Office of the Secretary of the Interior REQUIREMENTS FOR EQUAL OPPORTUNITY DURING CONSTRUCTION AND OPERATION OF THE ALASKA NATURAL GAS TRANSPORTATION SYSTEM § 34.8 Affirmative action plans. (a)(1) Within one hundred...

  8. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative...

  9. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative...

  10. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative...

  11. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Affirmative action plans. 34.8 Section 34.8 Public Lands: Interior Office of the Secretary of the Interior REQUIREMENTS FOR EQUAL OPPORTUNITY DURING CONSTRUCTION AND OPERATION OF THE ALASKA NATURAL GAS TRANSPORTATION SYSTEM § 34.8 Affirmative action plans. (a)(1) Within one hundred and...

  12. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100 Emergency action plans. (a) Scope...

  13. Adult Basic Skills: Developing a Local Action Plan.

    ERIC Educational Resources Information Center

    Basic Skills Agency, London (England).

    This document presents advice from the United Kingdom's Basic Skills Agency regarding developing local action plans. The first 20% of the document defines basic skills and discusses the following action plan components: (1) an estimate of the area's need for basic skills training; (2) a target to reduce the area's estimated scale of need; (3)…

  14. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS Emergency Action Plans...

  15. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100 Emergency action plans. (a) Scope...

  16. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100 Emergency action plans. (a) Scope...

  17. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document is a compilation of different issues identified by the Tiger Teams at the several locations of the Sandia National Laboratory. In this volume there are findings/concerns and the resultant responses and planned actions for these issues. Also included are the schedules and costs for the planned actions.

  18. The role of action control and action planning on fruit and vegetable consumption.

    PubMed

    Zhou, Guangyu; Gan, Yiqun; Miao, Miao; Hamilton, Kyra; Knoll, Nina; Schwarzer, Ralf

    2015-08-01

    Globally, fruit and vegetable intake is lower than recommended despite being an important component to a healthy diet. Adopting or maintaining a sufficient amount of fruit and vegetables in one's diet may require not only motivation but also self-regulatory processes. Action control and action planning are two key volitional determinants that have been identified in the literature; however, it is not fully understood how these two factors operate between intention and behavior. Thus, the aim of the current study was to explore the roles of action control and action planning as mediators between intentions and dietary behavior. A longitudinal study with three points in time was conducted. Participants (N = 286) were undergraduate students and invited to participate in a health behavior survey. At baseline (Time 1), measures of intention and fruit and vegetable intake were assessed. Two weeks later (Time 2), action control and action planning were assessed as putative sequential mediators. At Time 3 (two weeks after Time 2), fruit and vegetable consumption was measured as the outcome. The results revealed action control and action planning to sequentially mediate between intention and subsequent fruit and vegetable intake, controlling for baseline behavior. Both self-regulatory constructs, action control and action planning, make a difference when moving from motivation to action. Our preliminary evidence, therefore, suggests that planning may be more proximal to fruit and vegetable intake than action control. Further research, however, needs to be undertaken to substantiate this conclusion. PMID:25819607

  19. Action planning in sequential skills: relations to music performance.

    PubMed

    Keller, Peter E; Koch, Iring

    2008-02-01

    The hypothesis that planning music-like sequential actions involves anticipating their auditory effects was investigated in a series of experiments. Participants with varying levels of musical experience responded to each of four colour-patch stimuli by producing a unique sequence of three taps on three vertically aligned keys. Each tap triggered a tone in most experimental conditions. Response--effect (key-to-tone) mapping was either compatible--taps on the top, middle, and bottom keys triggered high, medium, and low pitched tones, respectively--or incompatible--key-to-tone mapping was scrambled, reversed, or neutral (taps on different keys triggered the same tone). The results suggest that action planning was faster with compatible than with incompatible mappings (and faster than with no tones). Furthermore, the size of this compatibility effect grew with increasing musical experience, which suggests that improvements in auditory imagery ability that typically accompany musical training may augment the role of anticipatory auditory-effect representations during planning. PMID:17853237

  20. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Corrective action plan. 280.66 Section...) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Release Response and Corrective Action for UST Systems Containing Petroleum or...

  1. K basins interim remedial action health and safety plan

    SciTech Connect

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  2. Planning my actions to accommodate yours: joint action development during early childhood.

    PubMed

    Meyer, Marlene; van der Wel, Robrecht P R D; Hunnius, Sabine

    2016-05-01

    The planning and adjusting of one's actions in relation to an action partner is fundamental to smooth joint action. During their first years of life, children gradually become more engaged in joint actions. Here, we investigated whether and at what age children take their partner into account in their action plans to accommodate the other's actions. We focused on children's proactive planning (without prior experience) and flexible adjustment of action plans over time. In a behavioural study, we tested 96 children from four age groups (2½, 3, 3½ and 5 years) in a joint cup-stacking task. Children passed cups to their partner who had only one hand available (alternating over time) to build a tower. Children's response choices were assessed (i.e. passing the cup on the free or occupied side to their partner). The study yielded two major findings. At all ages, children proactively planned their actions in a way that accommodated their partner's actions. However, only by 3½ years did children start to flexibly integrate their partner into their action plans. Even at age 5, children only showed minimal adjustments to their action partner. Candidate processes underlying these developmental changes (e.g. inhibitory control, cognitive flexibility, perspective taking) are discussed. PMID:27069048

  3. Topological susceptibility with the improved Asqtad action

    SciTech Connect

    C. Bernard et al.

    2004-01-06

    As a test of the chiral properties of the improved Asqtad (staggered fermion) action, we have been measuring the topological susceptibility as a function of quark masses for 2 + 1 dynamical flavors. We report preliminary results, which show reasonable agreement with leading order chiral perturbation theory for lattice spacing less than 0.1 fm. The total topological charge, however, shows strong persistence over Monte Carlo time.

  4. Planning action No. 2 planning criteria. Arapaho and Roosevelt National Forests and Pawnee National Grassland. Forest plan revision

    SciTech Connect

    Not Available

    1992-06-01

    The development of planning criteria is the second phase in the revision of the Forest Plan. Planning criteria are designed to guide the collection and use of inventory data and information, the analysis of the management situation, and the design, formulation, and evaluation of alternatives. Volume I of Planning Action 2 describes the specific methods used to analyze the management situation. Volume II of the Planning Action 2 describes the analysis process planned for the Forest Plan Revision. It includes a discussion of how to formulate and evaluate the alternatives, plus a summary of the needs for completion of Planning Action 4, the Analysis of the Management Situation (AMS).

  5. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... involving incentives, an appraisal using the residential income approach; (7) In the case of a plan of... approval of the proposed plan of action. (Approved by the Office of Management and Budget under control... except for that documentation deemed “proprietary information” under § 248.101. (b) Contents. The plan...

  6. Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site

    SciTech Connect

    DOE /NV

    1998-11-01

    This Corrective Action Investigation Plan (CAIP) describes the US Department of Energy's (DOE's) continued environmental investigation of the subsurface Project Shoal Area (PSA) Corrective Action Unit (CAU) 447. The PSA is located in the Sand Springs Mountains in Churchill County, Nevada, about 48 kilometers (km) (30 miles [mi]) southeast of Fallon, Nevada. Project Shoal was part of the Vela Uniform Program which was conducted to improve the US' ability to detect, identify, and locate underground nuclear detonations. The test consisted of detonating a 12-kiloton nuclear device deep underground in granitic rock to determine whether seismic waves produced by an underground nuclear test could be differentiated from seismic waves produced by a naturally occurring earthquake. The test was a joint effort conducted by the US Atomic Energy Commission (AEC) and the US Department of Defense (DoD) in October 1963 (AEC, 1964).

  7. National Action Plan for Energy Efficiency Report

    SciTech Connect

    National Action Plan for Energy Efficiency

    2006-07-01

    Summarizes recommendations, key barriers, and methods for energy efficiency in utility ratemaking as well as revenue requirements, resource planning processes, rate design, and program best practices.

  8. An Economic Evaluation of Asthma Action Plans for Children with Asthma

    PubMed Central

    Polisena, Julie; Tam, Susanna; Lodha, Abhay; Laporte, Audrey; Coyte, Peter C.; Ungar, Wendy J.

    2016-01-01

    The costs and effectiveness of asthma action plans for children were evaluated in a cross-sectional economic analysis. Direct health care and indirect costs, nights with symptoms, and asthma attacks were measured in 879 Ontario children with asthma. From a societal perspective, the total annual costs of the asthma action plan and the control groups were CDN$6, 948 and CDN$6, 140 per patient, respectively. Health outcomes were similar. The difference in cost was attributable to greater medication and health services use in the intervention group. Prospective randomized trials are necessary to measure potential improvements in control of asthma using asthma action plans. PMID:17885851

  9. Final consolidated action plan to Tiger Team. Volume 1, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  10. Final consolidated action plan to Tiger Team. Volume 2, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  11. Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada

    SciTech Connect

    Bechtel Nevada

    1998-08-31

    This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

  12. Using Strategic Planning To Improve Rural Schools.

    ERIC Educational Resources Information Center

    D'Amico, Joseph J.

    This paper describes the elements of strategic planning and applies them to educational reform and improvement. The paper also describes how a planning model, Strategic Planning for Educational Reform and Improvement (SPERI), was used by Rural Assistance Councils (RACs) in Pennsylvania and Delaware, with technical assistance from Research for…

  13. Improving Teaching with Collaborative Action Research: An ASCD Action Tool

    ERIC Educational Resources Information Center

    Cunningham, Diane

    2011-01-01

    Once you've established a professional learning community (PLC), you need to get this ASCD (Association for Supervision and Curriculum Development) action tool to ensure that your PLC stays focused on addressing teaching methods and student learning problems. This ASCD action tool explains how your PLC can use collaborative action research to…

  14. Heart Truth for Women: An Action Plan

    MedlinePlus

    ... care provider, a registered dietitian, or a qualified nutritionist to help you develop a sensible plan for ... exercise specialists, physical and occupational therapists, dietitians or nutritionists, and psychologists or other mental health specialists. Rehab ...

  15. An Action Research Plan for Developing and Implementing the Students' Listening Comprehension Skills

    ERIC Educational Resources Information Center

    Luo, Chunpin

    2008-01-01

    This is a proposal for an action research plan designed to find out how to improve students' listening comprehension skills, enhance their performance and help to promote better learning. This plan is focused on the minority students who major in English in our University. Listening comprehension is one of the most difficult courses for them. As…

  16. Learning through Participatory Action Research for Community Ecotourism Planning.

    ERIC Educational Resources Information Center

    Guevara, Jose Roberto Q.

    1996-01-01

    Ecologically sound tourism planning and policy require an empowering community participation. The participatory action research model helps a community gain understanding of its social reality, learn how to learn, initiate dialog, and discover new possibilities for addressing its situation. (SK)

  17. Controlling Asthma New Guidelines. New Medications. New Action Plans.

    MedlinePlus

    ... version of this page please turn Javascript on. New Guidelines. New Medications. New Action Plans. People everywhere and in every age ... I am putting the finishing touches on my new studio album that we hope to have out ...

  18. Actions for productivity improvement in crew training

    NASA Technical Reports Server (NTRS)

    Miller, G. E.

    1985-01-01

    Improvement of the productivity of astronaut crew instructors in the Space Shuttle program and beyond is proposed. It is suggested that instructor certification plans should be established to shorten the time required for trainers to develop their skills and improve their ability to convey those skills. Members of the training cadre should be thoroughly cross trained in their task. This provides better understanding of the overall task and greater flexibility in instructor utilization. Improved facility access will give instructors the benefit of practical application experience. Former crews should be integrated into the training of upcoming crews to bridge some of the gap between simulated conditions and the real world. The information contained in lengthy and complex training manuals can be presented more clearly and efficiently as computer lessons. The illustration, animation and interactive capabilities of the computer combine an effective means of explanation.

  19. 77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Contra Costa Water District. City of Santa Barbara. Tulare Irrigation...

  20. Climate Action Planning at the University of New Hampshire

    ERIC Educational Resources Information Center

    Cleaves, Sara M.; Pasinella, Brett; Andrews, Jennifer; Wake, Cameron

    2009-01-01

    Purpose: The purpose of this paper is to discuss the recent history of climate action planning at the University of New Hampshire (UNH), a public university with a long history of sustainability action and commitment. Items discussed include a partnership with Clean Air-Cool Planet (CA-CP) to produce a greenhouse gas (GHG) inventory tool that…

  1. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Corrective action plan. 280.66 Section 280.66 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE...

  2. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Corrective action plan. 280.66 Section 280.66 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE...

  3. National action plan to combat multidrug-resistant tuberculosis.

    PubMed

    1992-06-19

    At no time in recent history has tuberculosis (TB) been as great a concern as it is today. TB cases are on the increase, and the most serious aspect of the problem is the recent occurrence of outbreaks of multidrug-resistant (MDR) TB, which pose an urgent public health problem and require rapid intervention. A Task Force composed of representatives of many federal agencies has developed a National Action Plan for addressing this problem. The Task Force identified a number of objectives to be met if MDR-TB is to be successfully combatted. These objectives fall under the categories of a) surveillance and epidemiology--determining the magnitude and nature of the problem; b) laboratory diagnosis--improving the rapidity, sensitivity, and reliability of diagnostic methods for MDR-TB; c) patient management--effectively managing patients who have MDR-TB and preventing patients with drug-susceptible TB from developing drug-resistant disease; d) screening and preventive therapy--identifying persons who are infected with or at risk of developing MDR-TB and preventing them from developing clinically active TB; e) infection control--minimizing the risk of transmission of MDR-TB to patients, workers, and others in institutional settings; f) outbreak control; g) program evaluation--ensuring that TB programs are effective in managing patients and preventing MDR-TB; h) information dissemination/training and education; and i) research to provide new, more effective tools with which to combat MDR-TB. The Action Plan lays out a series of activities to be undertaken at the national level. For each category, the Plan presents statements of problems to be overcome, followed by a summary of the objective to be achieved and steps to be carried out. For each implementation step, responsibility is assigned to the appropriate organization and start-up dates are listed. PMID:1640920

  4. The Genesis of a Trauma Performance Improvement Plan.

    PubMed

    Pidgeon, Kristopher

    2015-01-01

    The purpose of this article is to assist the trauma medical and program director with developing a performance improvement and patients safety plan (PIPS), which is a required component of a successful trauma verification process by the American College of Surgeons. This article will review trauma quality standards and will describe in detail the required elements of a successful trauma center's performance improvement plan including a written comprehensive plan that outlines the mission and vision of the PIPS Program, authority of the PIPS Program, PIPS Program Committee reporting structure to the other hospital committees, list of required PIPS multidisciplinary team members, the operational components of the utilized data management system (trauma registry), list of indicators/audit filters, levels of review, peer determinations, corrective action plan with implementation, event resolution, and reevaluation. Strategies to develop a successful trauma performance improvement plan are presented. PMID:26574945

  5. 77 FR 59888 - General Conference Committee of the National Poultry Improvement Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ... National Poultry Improvement Plan AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Notice... to renew the charter of the General Conference Committee of the National Poultry Improvement Plan..., National Poultry Improvement Plan, VS, APHIS, USDA, 1506 Klondike Road, Suite 300, Conyers, GA 30094;...

  6. Hawaii's Adolescent Wellness Plan: Laulima in Action.

    ERIC Educational Resources Information Center

    Hawaii State Dept. of Health, Honolulu.

    Based on a need in Hawaii for a multilevel responsibility and commitment to ensure adolescent wellness, the Hawaii Adolescent Wellness Team developed a plan based on research and discussions with a variety of professionals and community leaders in health, education, and social service. This resource handbook is designed to assist communities in…

  7. Action Planning in Young Children's Tool Use

    ERIC Educational Resources Information Center

    Cox, Ralf F. A.; Smitsman, Ad W.

    2006-01-01

    Tool use consists of at least two coupled phases of activities, involving multi-step problem solving. It therefore provides an interesting window on the development of planning in goal-directed behavior. This study investigated 2-year-olds' and 3-year-olds' hand use in picking up and subsequently using a tool for displacing a target-object towards…

  8. Monitoring the Curriculum: From Plan to Action.

    ERIC Educational Resources Information Center

    Maglaras, Tom; Lynch, Deborah

    1988-01-01

    The Aurora Public School System (Colorado) has devised a plan to ensure implementation of the adopted curriculum. By developing a program monitoring process and incorporating it in a handbook, staff can rate their behavior and use "green flags" or "red alerts" to characterize subject area strengths and deficiencies. (MLH)

  9. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... of the effect of the proposed changes on existing tenants. (6) In the case of a plan of action involving incentives, an appraisal using the residential income approach; (7) In the case of a plan of... reasonably be expected to serve; and (8) A market study which demonstrates that the project is located in...

  10. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  11. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... responding to contaminated soil and ground water. In either case, owners and operators are responsible for... to the plan made by the implementing agency. They must monitor, evaluate, and report the results of... effective cleanup, begin cleanup of soil and ground water before the corrective action plan is...

  12. Crisis action planning and replanning using SIPE-2

    NASA Technical Reports Server (NTRS)

    Skidmore, Jennifer D.

    1993-01-01

    Rome Laboratory and DARPA are jointly sponsoring an initiative to develop the next generation of AI planning and scheduling technology focused on military operations planning, especially for crisis situations. SRI International has demonstrated their knowledge-based planning technology in this domain with a system called SOCAP, System for Operations Crisis Action Planning. SOCAP's underlying power comes from SIPE-2, a hierarchical, domain-independent, nonlinear AI planner also developed at SRI. This paper discusses the features of SIPE-2 that made it an ideal choice for military operations planning and which contributed greatly to SOCAP's success.

  13. White House Climate Action Plan Hotly Debated in Senate Hearing

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2014-01-01

    Emotions ran high among senators at a 16 January U.S. Senate hearing on the White House's Climate Action Plan; the hearing included administration officials and other supporters of the plan as well as opponents. The plan, which President Barack Obama presented in June 2013 (see Eos, 94(27), 239, doi:10.1002/2013EO270003), calls for cutting carbon pollution, preparing the nation for the impacts of climate change, and leading international efforts to address climate change.

  14. McClellan AFB Management Action Plan (MAP) submittal

    SciTech Connect

    Not Available

    1992-12-23

    This Management Action Plan ('Action Plan' or 'MAP') contains a status summary of the McClellan Air Force Base (McAFB) environmental restoration and compliance programs and presents a comprehensive strategy for implementing response actions necessary to protect human health and the environment. This strategy integrates activities under both the Installation Restoration Program (IRP) and the Environmental Compliance Program (ECP). This Action Plan is a dynamic document that will be updated on a regular basis using the change-a-page looseleaf binder concept for day-to-day revisions along with a subsection at the end of each chapter to highlight any modifications or innovations since the previous major annual review/update.

  15. Project Hanford management contract quality improvement project management plan

    SciTech Connect

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  16. An Affirmative Action Plan Response to Office of Civil Rights Enforcement Action.

    ERIC Educational Resources Information Center

    Stewart, Ned A., Jr.

    The affirmative action concept developed out of case law as the courts decided passive attempts at desegregating schools failed to achieve results and out of civil rights legislation as administrative agencies adopted the court-established standards. A major challenge of affirmative action plans is to prevent court-approved goals from becoming…

  17. Action plan to reduce perinatal mortality.

    PubMed

    Bhakoo, O N; Kumar, R

    1990-01-01

    The government of India has set a goal of reducing perinatal mortality from its current rate of 48/1000 to 30-35/1000 by the year 2000. Perinatal deaths result from maternal malnutrition, inadequate prenatal care, complications of delivery, and infections in the postpartum period. Since reductions in perinatal mortality require attention to social, economic, and behavioral factors, as well as improvements in the health care delivery system, a comprehensive strategy is required. Social measures, such as raising the age at marriage to 18 years for females, improving the nutritional status of adolescent girls, reducing the strenuousness of work during pregnancy, improving female literacy, raising women's status in the society and thus in the family, and poverty alleviation programs, would all help eliminate the extent of complications of pregnancy. Measures required to enhance infant survival include improved prenatal care, prenatal tetanus toxoid immunization, use of sterile disposable cord care kits, the provision of mucus extractors and resuscitation materials to birth attendants, the creation of neonatal care units in health facilities, and more efficient referral of high-risk newborns and mothers. Since 90% of births in rural India take place at home priority must be given to training traditional birth attendants in the identification of high risk factors during pregnancy, delivery, and the newborn period. PMID:12316585

  18. Global tropospheric chemistry: A plan for action

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Prompted by an increasing awareness of the influence of human activity on the chemistry of the global troposphere, a panel was formed to (1) assess the requirement for a global study of the chemistry of the troposphere; (2) develop a scientific strategy for a comprehensive plan taking into account the existing and projected programs of the government; (3) assess the requirements of a global study in terms of theoretical knowledge, numerical modeling, instrumentation, observing platforms, ground-level observational techniques, and other related needs; and (4) outline the appropriate sequence and coordination required to achieve the most effective utilization of available resources. Part 1 presents a coordinated national blueprint for scientific investigations of biogeochemical cycles in the global troposphere. part 2 presents much of the background information of the present knowledge and gaps in the understanding of tropospheric chemical cycles and processes from which the proposed program was developed.

  19. The role of action planning and plan enactment for smoking cessation

    PubMed Central

    2013-01-01

    Background Several studies have reemphasized the role of action planning. Yet, little attention has been paid to the role of plan enactment. This study assesses the determinants and the effects of action planning and plan enactment on smoking cessation. Methods One thousand and five participants completed questionnaires at baseline and at follow-ups after one and six months. Factors queried were part of the I-Change model. Descriptive analyses were used to assess which plans were enacted the most. Multivariate linear regression analyses were used to assess whether the intention to quit smoking predicted action planning and plan enactment, and to assess which factors would predict quitting behavior. Subsequently, both multivariate and univariate regression analyses were used to assess which particular action plans would be most effective in predicting quitting behavior. Similar analyses were performed among a subsample of smokers prepared to quit within one month. Results Smokers who intended to quit smoking within the next month had higher levels of action planning than those intending to quit within a year. Additional predictors of action planning were being older, being female, having relatively low levels of cigarette dependence, perceiving more positive and negative consequences of quitting, and having high self-efficacy toward quitting. Plan enactment was predicted by baseline intention to quit and levels of action planning. Regression analysis revealed that smoking cessation after six months was predicted by low levels of depression, having a non-smoking partner, the intention to quit within the next month, and plan enactment. Only 29% of the smokers who executed relatively few plans had quit smoking versus 59% of the smokers who executed many plans. The most effective preparatory plans for smoking cessation were removing all tobacco products from the house and choosing a specific date to quit. Conclusion Making preparatory plans to quit smoking is important

  20. Shaping the College Curriculum: Academic Plans in Action.

    ERIC Educational Resources Information Center

    Stark, Joan S.; Lattuca, Lisa R.

    This book proposes a broad view of the college curriculum, suggesting that it be defined as an "academic plan." The plan included decisions about what, why, and how students learn; ways to determine whether students have learned what they are supposed to learn; and methods of using this information to improve the plan. Taking both a macro and a…

  1. Evaluation of behavior change goal-setting action plan on oral health activity and status.

    PubMed

    Lepore, Lindsay M; Yoon, Richard K; Chinn, Courtney H; Chussid, Steven

    2011-11-01

    This experimental study determined if a "report card-like" oral health action plan was effective in improving oral health behaviors in a sample of 69 patients, ages 1 to 6 years. Participants were divided randomly into control and intervention groups. Data collected included dmft, plaque score, Streptococcus mutans levels and oral health behaviors. Participants in the intervention group received an oral health action plan that included: 1. child's current caries-risk status; 2. identification issues of concern; and 3. one "goal" to improve on for the next visit. All participants returned after two months for follow-up examination and data collection. PMID:22338818

  2. Beta band modulations underlie action representations for movement planning.

    PubMed

    Turella, Luca; Tucciarelli, Raffaele; Oosterhof, Nikolaas N; Weisz, Nathan; Rumiati, Raffaella; Lingnau, Angelika

    2016-08-01

    To be able to interact with our environment, we need to transform incoming sensory information into goal-directed motor outputs. Whereas our ability to plan an appropriate movement based on sensory information appears effortless and simple, the underlying brain dynamics are still largely unknown. Here we used magnetoencephalography (MEG) to investigate this issue by recording brain activity during the planning of non-visually guided reaching and grasping actions, performed with either the left or right hand. Adopting a combination of univariate and multivariate analyses, we revealed specific patterns of beta power modulations underlying varying levels of neural representations during movement planning. (1) Effector-specific modulations were evident as a decrease in power in the beta band. Within both hemispheres, this decrease was stronger while planning a movement with the contralateral hand. (2) The comparison of planned grasping and reaching led to a relative increase in power in the beta band. These power changes were localized within temporal, premotor and posterior parietal cortices. Action-related modulations overlapped with effector-related beta power changes within widespread frontal and parietal regions, suggesting the possible integration of these two types of neural representations. (3) Multivariate analyses of action-specific power changes revealed that part of this broadband beta modulation also contributed to the encoding of an effector-independent neural representation of a planned action within fronto-parietal and temporal regions. Our results suggest that beta band power modulations play a central role in movement planning, within both the dorsal and ventral stream, by coding and integrating different levels of neural representations, ranging from the simple representation of the to-be-moved effector up to an abstract, effector-independent representation of the upcoming action. PMID:27173760

  3. The Individualized Teacher Improvement Plan

    ERIC Educational Resources Information Center

    Hamlin, Erica

    2013-01-01

    This author states her belief that there must be an answer to devising an effective and credible way to link compensation to professional development and improved teaching. Such a model would need to be transparent, equitable, and financially manageable for the school. It would need to marry objectivity with the art of teaching, and have buy-in…

  4. A Wildlife Habitat Improvement Plan.

    ERIC Educational Resources Information Center

    Rogers, S. Elaine

    The document presents an overview of Stony Acres, a "sanctuary" for wildlife as well as a place for recreation enjoyment and education undertakings. A review of the history of wildlife habitat management at Stony Acres and the need for continued and improved wildlife habitat management for the property are discussed in Chapter I. Chapter II…

  5. SNF project engineering process improvement plan

    SciTech Connect

    DESAI, S.P.

    1999-07-13

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999.

  6. Linking Planning, Quality Improvement, and Institutional Research

    ERIC Educational Resources Information Center

    Seymour, Daniel; Kelley, John M.; Jasinski, John

    2004-01-01

    External and internal forces are driving institutions not only to create departments and positions that specialize in planning, quality improvement, and institutional research but also to link them within a systems context.

  7. 76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... QUALITY National Ocean Council; Strategic Action Plan Content Outlines AGENCY: Council on Environmental Quality. ACTION: Notice of Availability, Strategic Action Plan Content Outlines; Request for Comments... priority objectives. As a first step, Federal interagency writing teams have developed content outlines...

  8. 24 CFR 248.135 - Plans of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Plans of action. 248.135 Section 248.135 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MORTGAGE AND LOAN...

  9. State Action Plan for Iowa. "Marketing" Marketing Education.

    ERIC Educational Resources Information Center

    Omega Group, Inc., Haverford, PA.

    An Iowa project identified curriculum, program standards, and a framework for promoting marketing education programs. The mission for the state action plan for marketing education is to develop a strategy to revitalize Iowa's marketing education for the 21st century. Three goals support this mission: (1) create a community-wide awareness of the…

  10. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex,...

  11. Awarding Educational Credit for CETA Training: A Plan of Action.

    ERIC Educational Resources Information Center

    Sullins, W. Robert; And Others

    A project was conducted to determine problems or barriers prohibiting awarding credit for Comprehensive Employment and Training Act (CETA) training in Virginia. Potential solutions and strategies for their implementation were to be identified. A variety of methods were used to obtain information required to produce a Plan of Action that presents…

  12. Action Plan for the Development of Civic Morality

    ERIC Educational Resources Information Center

    Chinese Education and Society, 2006

    2006-01-01

    This paper discusses the action plan for the development of civic morality. Here, the importance, substance, ideology and policy principles guiding the development of civic morality is elaborated. In order to strengthen the development of civic morality, it is a must to adapt to the requirements of the developing situation; seize good…

  13. Creating a Global Agenda: Assessments, Solutions, and Action Plans.

    ERIC Educational Resources Information Center

    Didsbury, Howard F., Jr., Ed.

    Designed for educational policymakers and researchers, this volume on global issues is divided into four sections. The four essays in the first section, "Reducing the Nuclear Peril," offer a brief documentary survey and then present practical suggestions and action plans to reduce the nuclear threat. The eight papers in the second section,…

  14. Guide for Planning a High School Environmental Action Conference.

    ERIC Educational Resources Information Center

    Wanless, Angie, Comp.; And Others

    The purpose of this manual is to provide guidelines and suggestions for people organizing an environmental action conference for high school students. The format and planning suggestions are based on the methods used for a conference organized by the Wisconsin Center for Environmental Education in 1991. The bulk of the manual provides structure…

  15. Affirmative Action Plan. Access, Equity, Opportunity. Fifth Edition.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    The Affirmative Action Plan of the New York State Education Department is described in this document. First, a policy statement is provided by the New York State Education Department, committing the Department to the development of: (1) programmatic approaches to the elimination of all unjust exclusionary employment practices, policies, and…

  16. Evaluation criteria for communications-related corrective action plans

    SciTech Connect

    1997-02-01

    This document provides guidance and criteria for US Nuclear Regulatory Commission (NRC) personnel to use in evaluating corrective action plans for nuclear power plant communications. The document begins by describing the purpose, scope, and applicability of the evaluation criteria. Next, it presents background information concerning the communication process, root causes of communication errors, and development and implementation of corrective actions. The document then defines specific criteria for evaluating the effectiveness of the corrective action plan, interview protocols, and an observation protocol related to communication processes. This document is intended only as guidance. It is not intended to have the effect of a regulation, and it does not establish any binding requirements or interpretations of NRC regulations.

  17. Predicting Changes in Physical Activity among Adolescents: The Role of Self-Efficacy, Intention, Action Planning and Coping Planning

    ERIC Educational Resources Information Center

    Araujo-Soares, Vera; McIntyre, Teresa; Sniehotta, Falko F.

    2009-01-01

    This paper aims to test the direct predictors of the theory of planned behaviour (TPB), action planning and coping planning as predictors of changes in physical activity (PA) in 157 adolescents (mean age: 12). TPB measures, the Action Planning and Coping Planning Scales (APCPS) and the International Physical Activity Questionnaires were measured…

  18. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 536: AREA 3 RELEASE SITE, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2005-09-01

    CAU 536 consists of CAS 03-44-02, Steam Jenny Discharge, located in Area 3 of the NTS. The site was characterized in 2004 according to the approved CAIP and the site characterization results are reported in the CAU 536 CADD. The purpose of this Corrective Action Plan (CAP) is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 536 CADD.

  19. From the Desk of the Secretary of Education: An Action Plan for Educational Technology.

    ERIC Educational Resources Information Center

    Riley, Richard W.

    1995-01-01

    Emphasizes importance of educational technology in classrooms and presents action plan to utilize technology to improve American education. Identifies obstacles preventing utilization of technology to its fullest potential. Highlights leadership efforts of federal government to develop teachers' professional skills with new technologies. Suggests…

  20. Guam Public School System District Action Plan: Goals and Objectives, 2007

    ERIC Educational Resources Information Center

    Guam Public School System, 2007

    2007-01-01

    The Guam Education Policy Board initially adopted the Guam Public School System District Action Plan in May 2003. The DAP established the direction and details for improving academic performance in reading, math, and language arts by using the provisions of the No Child Left Behind Act as a framework. The adopted DAP was also used as a basis for…

  1. Essential Communication and Documentation Skills. Module: Final Assessment and Action Planning.

    ERIC Educational Resources Information Center

    Medina, Muriel; And Others

    This module is the 10th of 10 in the Essential Communication and Documentation Skills curriculum. It develops final assessment and action planning, workplace literacy skills identified as being directly related to the job of the direct care worker. The curriculum is designed to improve the competence of New York State Division for Youth direct…

  2. Enhancing School Asthma Action Plans: Qualitative Results from Southeast Minnesota Beacon Stakeholder Groups

    ERIC Educational Resources Information Center

    Egginton, Jason S.; Textor, Lauren; Knoebel, Erin; McWilliams, Deborah; Aleman, Marty; Yawn, Barbara

    2013-01-01

    Background: This study explores ways southeast Minnesota schools currently address asthma problems, identifies areas for improvement, and assesses the potential value of asthma action plans (AAPs) in schools. Methods: Focus groups were used to query stakeholder groups on asthma care in schools. Groups were held separately for elementary school…

  3. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    SciTech Connect

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action.

  4. Action Planning Mediates Guidance of Visual Attention from Working Memory.

    PubMed

    Feldmann-Wüstefeld, Tobias; Schubö, Anna

    2015-01-01

    Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM) content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing) and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton) was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles), thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences. PMID:26171241

  5. Affirmative Action Plans, January 1, 1994--December 31, 1994. Revision

    SciTech Connect

    Not Available

    1994-02-16

    This document is the Affirmative Action Plan for January 1, 1994 through December 31, 1994 for the Lawrence Berkeley Laboratory, University of California (``LBL`` or ``the Laboratory.``) This is an official document that will be presented upon request to the Office of Federal Contract Compliance Programs, US Department of Labor. The plan is prepared in accordance with the Executive Order 11246 and 41 CFR Section 60-1 et seq. covering equal employment opportunity and will be updated during the year, if appropriate. Analyses included in this volume as required by government regulations are based on statistical comparisons. All statistical comparisons involve the use of geographic areas and various sources of statistics. The geographic areas and sources of statistics used here are in compliance with the government regulations, as interpreted. The use of any geographic area or statistic does not indicate agreement that the geographic area is the most appropriate or that the statistic is the most relevant. The use of such geographic areas and statistics is intended to have no significance outside the context of this Affirmative Action Plan, although, of course, such statistics and geographic areas will be used in good faith with respect to this Affirmative Action Plan.

  6. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  7. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  8. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  9. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  10. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  11. Commonwealth of the Northern Mariana Islands Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  12. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  13. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  14. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  15. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  16. Planning ahead: Improving escalation plans before the weekend.

    PubMed

    Zarkali, Angeliki; Black, Duncan; Smee, Elizabeth; Deshraj, Anshul; Smallwood, Nicholas

    2014-01-01

    Handover is the system by which responsibility for patient care is transferred between healthcare professionals. A significant aspect of handover is the existence of an escalation plan for each patient in case of deterioration over the weekend. According to the Royal College of Physicians, all patients should have a clear escalation plan documented in the notes before a weekend, since parent medical teams (Consultant team in charge of care) are best placed to make these decisions. If left to on-call teams, at a time of deterioration over a weekend, they might not have all available information, the patient might be unable to be involved in the decisions, and the family might not be consulted. With this is mind, we decided to analyse the existing handover process in a medium sized district general hospital, with the aim of improving the process and the documentation of escalation plans. The results from our retrospective analysis of the system in place revealed a significant lack of documentation of escalation plans in the medical notes. Three sample wards were selected to analyse the current handover system and test proposed measures before hospital-wide implementation. After trialling of a physical handover meeting in addition to the existing intranet system and a proforma for the Friday ward round, the documentation of escalation plans in the patients' notes improved from 9.1% to 41.1%. Based on these results, as well as formal feedback from junior doctors and informal feedback from other staff, the physical handover meeting and Friday ward round proforma will be implemented throughout the Trust. Our interventions led to an improvement in the documentation of escalation plans in our hospital, thus saving precious time in the event of a patient's deterioration. This also ensures that families and patients are involved in the decision making process and kept informed, and reduces the burden for the weekend on-call teams. PMID:26734241

  17. Software Engineering Improvement Activities/Plan

    NASA Technical Reports Server (NTRS)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.

  18. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  19. Perspectives that influence action plans for chronic obstructive pulmonary disease

    PubMed Central

    Costi, S; Brooks, D; Goldstein, RS

    2006-01-01

    BACKGROUND: Prompt treatment of acute exacerbations (AEs) in chronic obstructive pulmonary disease (COPD) improves quality of life and reduces the use of health care resources. Although patient self-management through an individualized action plan (AP) can help with early initiation of therapy, its use is critically dependent on the patient recognizing the features of an exacerbation. OBJECTIVE: To describe COPD patients’ experiences with AEs, as well as health care professionals’ (HCPs’) attitudes toward the provision of an AP as part of self-management education. METHODS: Thirty-two patients with moderate to severe COPD who recently experienced at least one AE, and 22 HCPs with experience in the management of COPD, were interviewed. RESULTS: The most common symptoms and signs associated with an AE were difficulty breathing (84%), fatigue (81%), cold symptoms (59%), changes in sputum colour (53%) or amount (47%), and cough (44%). The main precipitants identified were environmental triggers (47%), infective agents (31%), excessive activities (25%), emotional factors (16%) and changes in medications (9%). Strategies for dyspnea relief included increasing medications (72%), resting (56%), avoiding exposure to environmental triggers (41%) and performing breathing exercises (31%). Patients supported the use of an AP and recommended that it be individualized for symptoms and triggers, and that it should also include strategies for addressing anxiety and depression. HCPs also supported the use of an individualized AP and recommended that it be regularly revisited, depending on the patient’s disease severity. CONCLUSIONS: Patients’ experiences with AEs do not always conform to a standard medical definition. Therefore, an understanding of their experience is of value in the design of an individualized AP. HCPs support the use of an AP that emphasizes self-management of exacerbations as well as general COPD management. PMID:17036089

  20. Information architecture: Standards adoption and retirement process service action plan

    SciTech Connect

    1997-03-01

    The purpose of this Service Action Plan is to announce, as well as provide, a high-level outline of a new Departmental process for the adoption and retirement of information technology standards. This process supports the implementation of a Department of Energy (DOE) Information Architecture. This plan was prepared with the Department of Energy information technology standards customers and stakeholders in mind. The process described in this plan will be serviced primarily by staff from the Office of the Deputy Assistant Secretary for Information Management with assistance from designated program and site Information Technology Standards Points of Contact. We welcome any comments regarding this new Departmental process and encourage the proposal of information technology standards for adoption or retirement.

  1. 23 CFR 1200.25 - Improvement plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Improvement plan. 1200.25 Section 1200.25 Highways NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION AND FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROCEDURES FOR STATE HIGHWAY SAFETY PROGRAMS UNIFORM PROCEDURES FOR STATE HIGHWAY SAFETY PROGRAMS Implementation and Management of the...

  2. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation

  3. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    SciTech Connect

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the Corrective Action Unit No. 426, which includes the Cactus Spring Waste Trenches, located at the Tonopah Test Range. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action. The scope of this investigation will include drilling and collecting subsurface samples from within and below the trenches. Sampling locations will be biased toward the areas most likely to be contaminated. The Cactus Spring Waste Trenches Site is identified as one of three potential locations for buried, radioactively contaminated materials from the Double Tracks Test. This test was the first of four storage-transportation tests conducted in 1963 as part of Operation Roller Coaster. The experiment involved the use of live animals to assess the inhalation intake of a plutonium aerosol.

  4. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  5. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    SciTech Connect

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  6. Action Plan for updated Chapter 15 Accident Analysis in the SRS Production Reactor SAR

    SciTech Connect

    Hightower, N.T. III; Burnett, T.W.

    1989-11-15

    This report describes the Action Plan for the upgrade of the Chapter 15 Accident Analysis in the SRS Production Reactor SAR required for K-Restart. This Action Plan will be updated periodically to reflect task accomplishments and issue resolutions.

  7. Workshop on the preparation of climate change action plans. Workshop summary

    SciTech Connect

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  8. The Good, the Bad, and the Ugly: An Analysis of the Chicago Public Schools' Capital Improvement Plan.

    ERIC Educational Resources Information Center

    Ryan, Matt; Schwartz, Chris

    This report examines the Chicago Public School System's need for capital improvement, and it highlights action plans for the future. The report reveals that many planned school improvements projects are unfunded and that there is about $229 million worth of projects that no longer appear in the city's capital improvements plan. Overcrowding…

  9. Strategic planning to drive integrated continuous improvement.

    PubMed

    McChesney, H

    1995-11-01

    This case study describes how one company involved multiple levels of all functions to develop a comprehensive strategic plan that drives the continuous improvement initiative. The process involves clearly defining a mission, assessing the current situation, developing goals designed to achieve a preferred future status, and establishing the specific tactics to move toward that preferred future. The plan then drives integrated efforts throughout the organization to help manage the business of providing the highest quality products and services to meet current and anticipated customer requirements. PMID:10152530

  10. Planning perception and action for cognitive mobile manipulators

    NASA Astrophysics Data System (ADS)

    Gaschler, Andre; Nogina, Svetlana; Petrick, Ronald P. A.; Knoll, Alois

    2013-12-01

    We present a general approach to perception and manipulation planning for cognitive mobile manipulators. Rather than hard-coding single purpose robot applications, a robot should be able to reason about its basic skills in order to solve complex problems autonomously. Humans intuitively solve tasks in real-world scenarios by breaking down abstract problems into smaller sub-tasks and use heuristics based on their previous experience. We apply a similar idea for planning perception and manipulation to cognitive mobile robots. Our approach is based on contingent planning and run-time sensing, integrated in our knowledge of volumes" planning framework, called KVP. Using the general-purpose PKS planner, we model information-gathering actions at plan time that have multiple possible outcomes at run time. As a result, perception and sensing arise as necessary preconditions for manipulation, rather than being hard-coded as tasks themselves. We demonstrate the e ectiveness of our approach on two scenarios covering visual and force sensing on a real mobile manipulator.

  11. The Dilemma of High Level Planning in Distributed Agile Software Projects: An Action Research Study in a Danish Bank

    NASA Astrophysics Data System (ADS)

    Svejvig, Per; Fladkjær Nielsen, Ann-Dorte

    The chapter reports on an action research study with the aim to design a high level planning process in distributed and co-located software projects based on agile methods. The main contributions are the insight that high level planning process is highly integrated with other project disciplines and specific steps has to be taken to apply the process in distributed projects; and the action research approach is indeed suitable to software process improvements.

  12. Improving Student Engagement: Ten Proposals for Action

    ERIC Educational Resources Information Center

    Zepke, Nick; Leach, Linda

    2010-01-01

    Since the 1980s an extensive research literature has investigated how to improve student success in higher education focusing on student outcomes such as retention, completion and employability. A parallel research programme has focused on how students engage with their studies and what they, institutions and educators can do to enhance their…

  13. Corrective Action Plan for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada

    SciTech Connect

    Bechtel Nevada

    1998-09-30

    This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that the landfill cells were used for solid waste disposal, including disposal of UXO.

  14. Action Research: Improving Schools and Empowering Educators. Third Edition

    ERIC Educational Resources Information Center

    Mertler, Craig A.

    2011-01-01

    Written for pre- and in-service educators, this "Third Edition" of Craig A. Mertler's "Action Research: Improving Schools and Empowering Educators" introduces the process of conducting one's own classroom- or school-based action research in conjunction with everyday instructional practices and activities. The text provides educators with the…

  15. Improving Teacher Education through Action Research. Routledge Research in Education

    ERIC Educational Resources Information Center

    Hui, Ming-Fai, Ed.; Grossman, David L., Ed.

    2011-01-01

    There has been a dearth of studies on teacher educators using action research to improve their own practice. This book is the first systematic study of a group of teachers examining and enhancing their own practice through the inquiry process of action research. This book presents a broad overview of a variety of methodologies that can be used to…

  16. SNF project engineering process improvement plan

    SciTech Connect

    KELMENSON, R.L.

    1999-05-24

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999.

  17. Practice in Planning and Planning in Practice: Re-Assessing and Clarifying Action Research in a Multi-National Context

    ERIC Educational Resources Information Center

    Kusch, Jim; Rebolledo, Geisha; Ryan, Charly

    2005-01-01

    This paper responds to a call seeking presenters for an action-research event for elementary-school science teachers in Venezuela. The authors planned on the assumption that the participants would wish to leave with plans for introducing action-research approaches into their practice. In previous writing on action research, the various protocols…

  18. Planning for primary health care: the case of the Sierra Leone National Action Plan.

    PubMed

    Decosas, J

    1990-01-01

    The National Action Plan for Primary Health Care, a planning document of the Sierra Leonean Ministry of Health for the restructuring of the country's rural health services, is analyzed in its social, economic, and historical context. It appears to be an attempt of the national government to gain control over the highly devolved health care delivery system, but the state has neither the political will nor the power to achieve this goal. The utility of the document is therefore in doubt, which raises two important questions: Whose interests does this plan serve, and at whose cost? PMID:2307554

  19. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  20. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  1. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 2 2013-07-01 2013-07-01 false What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  2. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  3. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 2 2012-07-01 2012-07-01 false What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  4. Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children

    ERIC Educational Resources Information Center

    Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert

    2013-01-01

    The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…

  5. Report of the Tape Recorder Action Plan Committee, 21 March 1972

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A NASA/AF Tape Recorder Action Plan Committee was formed in January 1972 to investigate tape recorder problems and to recommend an action plan to NASA management. The committee collected data on tape recorder failure history, pinpointed problem areas, discussed needed technical and management changes, and proposed an action plan for the recommended approaches.

  6. Scaling tests of the improved Kogut-Susskind quark action

    SciTech Connect

    Bernard, Claude; Burch, Tom; DeGrand, Thomas A.; DeTar, Carleton; Gottlieb, Steven; Heller, Urs M.; Hetrick, James E.; Orginos, Kostas; Sugar, Bob; Toussaint, Doug

    2000-06-01

    Improved lattice actions for Kogut-Susskind quarks have been shown to improve rotational symmetry and flavor symmetry. In this work we find improved scaling behavior of the {rho} and nucleon masses expressed in units of a length scale obtained from the static quark potential, and better behavior of the Dirac operator in instanton backgrounds. (c) 2000 The American Physical Society.

  7. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 4 2014-07-01 2014-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action...

  8. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action...

  9. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action...

  10. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 4 2012-07-01 2012-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action...

  11. The scaup conservation action plan: working toward coherence

    USGS Publications Warehouse

    Austin, Jane E.

    2010-01-01

    The last in a series of three workshops to develop a decision framework for the scaup conservation action plan was conducted in September 2009. Fifteen waterfowl biologists and managers met in Memphis, Tennessee at the Ducks Unlimited Headquarters to review and refine the decision statement, objectives, and prototype model for the continental scaup population, with a special focus on vital rate parameters that are affected during migration and winter. In a significant step toward coherence, the participants also developed models for incorporating human dimensions – hunters – into the decision framework, and to link the population of diving duck hunters with the continental scaup population.

  12. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    SciTech Connect

    Not Available

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  13. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Not Available

    1992-10-01

    The Uranium Mill Tallings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1 (Chapter 3, paragraph 2). The UMTRA EPIP covers the time period of November 9, 1992, through November 8, 1993. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  14. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  15. The Representation of Action Plans in Long Term Memory

    NASA Technical Reports Server (NTRS)

    Fussfeld, G. N.; Koenig, W.; Karis, D.

    1984-01-01

    A sequence of experiments conducted on a two hand chord typewriter, to compare the efficiency of different coding principles employed to associate letters with their chord productions is described. This keyboard represents an effort to identify effective alternatives to the existing typewriter. It consists of two seperate 5-key panels (one for each hand), and letters are entered by typing chords composed of one to five fingers. Each panel is capable of producing the full alphabet. One group of experiments was designed to separate between perceptual and motor factors in the acivation of single letter chords. The results underline the importance of perceptual factors in the activation of motor plans. The complexity of the patterns employed to represent letters was shown to account for 50 percent of variance in the typing speeds of single letters. The theoretical implications of these results are discussed in relation to a vision based theory of action plans.

  16. Planning an Action: A Developmental Progression in Tool Use

    PubMed Central

    Keen, Rachel; Lee, Mei-Hua; Adolph, Karen

    2014-01-01

    How children pick up a tool reveals their ability to plan an action with the end goal in mind. When presented with a spoon whose handle points away from their dominant hand, children between infancy and 8 years of age progress from using an awkward ulnar grip that causes food to spill from the spoon to consistently using a radial grip. At 4 years of age children’s grip strategies are highly variable, including the awkward grips of infancy and use of the non-dominant hand, but they also employ adult-like grips never seen in infancy. By 8 years of age the infantile ulnar grip has completely disappeared and is replaced by more mature and effective grips that indicates better planning for the end goal. PMID:24954996

  17. Learning to improve path planning performance

    SciTech Connect

    Chen, Pang C.

    1995-04-01

    In robotics, path planning refers to finding a short. collision-free path from an initial robot configuration to a desired configuratioin. It has to be fast to support real-time task-level robot programming. Unfortunately, current planning techniques are still too slow to be effective, as they often require several minutes, if not hours of computation. To remedy this situation, we present and analyze a learning algorithm that uses past experience to increase future performance. The algorithm relies on an existing path planner to provide solutions to difficult tasks. From these solutions, an evolving sparse network of useful robot configurations is learned to support faster planning. More generally, the algorithm provides a speedup-learning framework in which a slow but capable planner may be improved both cost-wise and capability-wise by a faster but less capable planner coupled with experience. The basic algorithm is suitable for stationary environments, and can be extended to accommodate changing environments with on-demand experience repair and object-attached experience abstraction. To analyze the algorithm, we characterize the situations in which the adaptive planner is useful, provide quantitative bounds to predict its behavior, and confirm our theoretical results with experiments in path planning of manipulators. Our algorithm and analysis are sufficiently, general that they may also be applied to other planning domains in which experience is useful.

  18. Improved actions, redundant operators and scaling in lattice SU(3)

    NASA Astrophysics Data System (ADS)

    Patel, Apoorva; Gupta, Rajan

    1987-01-01

    Schwinger-Dyson equations are used to systematically calculate redundant operators in lattice QCD and their role in perturbatively improved actions is analyzed. The criteria for improved actions in Monte Carlo simulations are discussed and their usefulness also. In particular the renormalized trajectory is estimated for the b = sqrt(3) renormalization group transformation in a four-parameter space and its scaling behavior is studied for future use in spectrum calculations. J. Robert Oppenheimer Fellow.

  19. Protecting drinkable water: an analysis of action plans and stakeholders' networks

    NASA Astrophysics Data System (ADS)

    Gascuel-Odoux, Chantal; Menard, Marjorie

    2015-04-01

    Since WFD the policy for protecting drinkable water has been enhanced in France. This policy establish the main components and the different steps for protecting drinkable water, and ask for defining and implementing an action plan for each contributing catchment. Despite ambitious objectives, the local implementation is difficult. Firstly there is a high diversity of stakeholders involved with local authorities, which are mainly: water agencies, agricultural chambers and consultants, authorities at regional and departmental levels. Most of the local authorities do not feel qualified enough for carrying out such a policy, as they are not really used to deal with technical and political issues related to agricultural diffuse pollutions. As a consequence assessed action plans are based on regulation and/or agri-environmental measures. More ambitious and complementary measures can be included, but without any support measure nor accurate objectives for their implementation. In the end, action plans reflect more a formal implementation of protection approaches than a search for efficiency by defining ambitious measures and the setting-up a consistent support scheme. The way stakeholders' networks mobilize knowledge have been analyzed based on ten case studies located in three different regions. Three local authorities profiles are defined: (1) the "passive" ones, not really convinced of the necessity to undertake actions against diffuse pollutions and/or having low level of knowledge to support local reflexion, that delegate project management; (2) the local authorities that support local protection approach but that, for different reasons, do not search for an effective action plan, and that only consider an improvement approach; (3) the local authorities that more rarely, aim at efficient actions, motivated by the urgent need of action for preserving threatened resources. According to these profiles, local authorities and their project coordinators will be looking

  20. Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    SciTech Connect

    T. M. Fitzmaurice

    2000-05-01

    This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

  1. Improved Planning Abilities in Binge Eating

    PubMed Central

    Neveu, Rémi; Neveu, Dorine; Barsumian, Franck; Fouragnan, Elsa; Carrier, Edouard; Lai, Massimo; Sultan, Jocelyne; Nicolas, Alain; Coricelli, Giorgio

    2014-01-01

    Objective The role of planning in binge eating episodes is unknown. We investigated the characteristics of planning associated with food cues in binging patients. We studied planning based on backward reasoning, reasoning that determines a sequence of actions back to front from the final outcome. Method A cross-sectional study was conducted with 20 healthy participants, 20 bulimia nervosa (BN), 22 restrictive (ANR) and 23 binging anorexia nervosa (ANB), without any concomitant impulsive disorder. In neutral/relaxing, binge food and stressful conditions, backward reasoning was assessed with the Race game, promotion of delayed large rewards with an intertemporal discounting task, attention with the Simon task, and repeating a dominant behavior with the Go/No-go task. Results BN and to a lower extent ANB patients succeeded more at the Race game in food than in neutral condition. This difference discriminated binging from non-binging participants. Backward reasoning in the food condition was associated with lower approach behavior toward food in BN patients, and higher food avoidance in ANB patients. Enhanced backward reasoning in the food condition related to preferences for delayed large rewards in BN patients. In BN and ANB patients the enhanced success rate at the Race game in the food condition was associated with higher attention paid to binge food. Conclusion These findings introduce a novel process underlying binges: planning based on backward reasoning is associated with binges. It likely aims to reduce craving for binge foods and extend binge refractory period in BN patients, and avoid binging in ANB patients. Shifts between these goals might explain shifts between eating disorder subtypes. PMID:25148580

  2. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    ERIC Educational Resources Information Center

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  3. 42 CFR 430.16 - Timing and notice of action on State plan material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Timing and notice of action on State plan material... State Plans § 430.16 Timing and notice of action on State plan material. (a) Timing. (1) A State plan or... of any additional information it needs in order to make a final determination. (2) If CMS...

  4. 42 CFR 430.16 - Timing and notice of action on State plan material.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Timing and notice of action on State plan material... State Plans § 430.16 Timing and notice of action on State plan material. (a) Timing. (1) A State plan or... of any additional information it needs in order to make a final determination. (2) If CMS...

  5. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2009-03-31

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12

  6. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  7. The limits of scientific planning: Doxiadis and the Tehran Action Plan.

    PubMed

    Madanipour, Ali

    2010-01-01

    Tehran after the Second World War experienced a modernization drive and rapid population growth. In 1972, the Greek planner, Constantinos Doxiadis, who had already undertaken major housing and planning projects in Iran, was invited to prepare an action plan for the city, to guide the future investment for easing the city's problems. Doxiadis saw cities as nightmares, but advocated that a holistic scientific analysis and a naturalist approach to urban growth management could address their problems. In applying his ideas to Tehran, however, the limits of his ideas of scientific planning became evident, not only through contextual pressures, such as lack of time and data, but also through the planning consultant's approach, in which commercial considerations and the application of readymade solutions could shape the outcome. Rather than working with the context, Doxiadis followed the modernist tenet of breaking with the past, proposing the creation of West Tehran, an alternative to the city where all future growth should take place on a utopian basis. The radical nature of his proposals, his death, and a turbulent revolution aborted the impact of his action plan on Tehran, while faith in modernist scientific planning was widely being abandoned. PMID:20857604

  8. 76 FR 15791 - National Poultry Improvement Plan and Auxiliary Provisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ...We are amending the National Poultry Improvement Plan (the Plan) and its auxiliary provisions by providing new or modified sampling and testing procedures for Plan participants and participating flocks. The changes were voted on and approved by the voting delegates at the Plan's 2008 National Plan Conference. These changes will keep the provisions of the Plan current with changes in the......

  9. North Slope (Wahluke Slope) expedited response action cleanup plan

    SciTech Connect

    Not Available

    1994-02-01

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

  10. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    SciTech Connect

    DOE /NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  11. 42 CFR 460.132 - Quality assessment and performance improvement plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... or maintain the delivery of services and patient care. (2) Develop and implement plans of action to... 42 Public Health 4 2012-10-01 2012-10-01 false Quality assessment and performance improvement plan. 460.132 Section 460.132 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF...

  12. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The following Water Management Plans are available for review: Orland-Artois Water District Kern Tulare Water District To meet the requirements...

  13. Continuous Improvement in Action: Educators' Evidence Use for School Improvement

    ERIC Educational Resources Information Center

    Cannata, Marisa; Redding, Christopher; Rubin, Mollie

    2016-01-01

    The focus of the article is the process educators use to interpret data to turn it into usable knowledge (Honig & Coburn, 2008) while engaging in a continuous improvement process. The authors examine the types of evidence educators draw upon, its perceived relevance, and the social context in which the evidence is examined. Evidence includes…

  14. [International and Israeli physicians' health--information and action plan].

    PubMed

    Reis, Shmuel; Sayag, Shlomit; Karkabi, Khalid; Alroi, Gideon

    2008-03-01

    Physician health is a matter of interest for patients' physicians and their teams, managers and policy-makers. It has an impact on public health, physician impairment, patient safety, resource allocation and malpractice litigation. International medical literature, unlike Israel publications, is extensively preoccupied with the domain. Based on 2 MD thesis dissertations, Ministry of Health data and a literature search, the present review addresses many issues. It deals with: physicians' physical and mental health internationally and in Israel, prevention and health promotion, burn-out, the professional lifespan and career, health services utilization, legal and administrative aspects, boundaries, physicians' characteristics and vulnerability, interpersonal relations, care provided by physicians, physicians as patients and finally the impaired physician. International recommendations as well as a proposal for a local action plan are presented. PMID:18488866

  15. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 4 2011-07-01 2011-07-01 false Affirmative action plans or programs under State or local law. 1608.7 Section 1608.7 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or...

  16. Arkansas Consolidated School Improvement Planning (ACSIP): Handbook. 2005-06

    ERIC Educational Resources Information Center

    Arkansas Department of Education, 2005

    2005-01-01

    The Arkansas Consolidated School Improvement Planning model (ACSIP) is an annual comprehensive planning and fund distribution design that must be used by all Arkansas public schools. Using the ACSIP model, each school in Arkansas develops a comprehensive school improvement plan. The plan is used, also, as the school's application for all federal…

  17. Dual-action gas thrust bearing for improving load capacity

    NASA Technical Reports Server (NTRS)

    Etsion, I.

    1976-01-01

    The principle of utilizing hydrodynamic effects in diverging films to improve the load carrying capacity in gas thrust bearings is discussed. A new concept of a dual action bearing based on that principle is described and analyzed. The potential of the new bearing is demonstrated both analytically for an infinitely long slider and by numerical solution for a flat sector shaped thrust bearing. It is shown that the dual action bearing can extend substantially the range of load carrying capacity in gas lubricated thrust bearings and can improve their efficiency.

  18. 75 FR 60759 - Enforcement Action Plan for Promotion and Advertising Restrictions; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ...The Food and Drug Administration (FDA) is announcing the availability of a document entitled ``Enforcement Action Plan for Promotion and Advertising Restrictions'' (Enforcement Action Plan), which describes FDA's plan to enforce the restrictions on promotion and advertising of menthol and other cigarettes to youth and other requirements relating to tobacco product promotion and advertising......

  19. Cool Campus! A How-To Guide for College and University Climate Action Planning

    ERIC Educational Resources Information Center

    Simpson, Walter

    2009-01-01

    While a number of excellent campus climate planning resources are available, this guide attempts to fill a gap by providing an abundance of "how-to" information. The goal of the guide is to assist climate action planning teams at schools that are well versed in campus climate issues and well along in the CAP (Climate Action Planning) process as…

  20. Group Action Planning As a Support Strategy for Hispanic Families: Parent and Professional Perspectives.

    ERIC Educational Resources Information Center

    Blue-Banning, Martha J.; Turnbull, Ann P.; Pereira, Lourdes

    2000-01-01

    Thirty-eight Hispanic parents of children (ages 6-26) with developmental disabilities and 22 professionals participated in focus group interviews on group action planning. Both constituency groups identified advantages and disadvantages to group action planning. Parents indicated this type of planning process could increased the quality and…

  1. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  2. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 8 2013-10-01 2013-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  3. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 8 2012-10-01 2012-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  4. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 8 2011-10-01 2011-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  5. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 8 2014-10-01 2014-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  6. Water Planning and Climate Change: Actionable Intelligence Yet?

    NASA Astrophysics Data System (ADS)

    Milly, P.

    2008-05-01

    alternative. What is to be done? Is climate-change information of sufficient strength to justify making decisions that differ from those that would be optimal under stationarity? I.e., does climate science provide "actionable intelligence" to water planners? A conservative approach to planning in the presence of climate change would begin with stationarity as a base and then superpose, with quantitative estimates of uncertainties, those model-projected changes that appear to be qualitatively robust. The current state of science suggests that the following changes could be considered robust: (1) reduction in the fraction of precipitation falling as snow and earlier seasonal melting of snow, with consequent seasonal redistribution of runoff and streamflow; (2) gradual sea-level rise with heightened risk of encroachment of saline water into coastal surface- and ground-water-supply sources; and (3) global redistribution of precipitation and resultant runoff, with regional focal points ("hot spots") of desiccation and moistening. Even considering the attendant uncertainties, the available information about these changes can significantly affect the cost-benefit-risk tradeoffs of existing and prospective water projects and, therefore, can rationally inform decisions about future courses of action or inaction.

  7. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    USDOE /NV

    1999-05-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document.

  8. A Three Step Plan for Implementing an Affirmative Action Program

    ERIC Educational Resources Information Center

    Hilaael, Timothy M.

    1976-01-01

    (1) Centralize organizational responsibility for affirmative action. (2) Conduct an organizational audit related to the Equal Employment Opportunity Act. (3) Implement affirmative action as an administrative responsibility. (Author)

  9. The sequential encoding of competing action goals involves dynamic restructuring of motor plans in working memory.

    PubMed

    Gallivan, Jason P; Bowman, Natasha A R; Chapman, Craig S; Wolpert, Daniel M; Flanagan, J Randall

    2016-06-01

    Recent neural and behavioral findings provide support for the influential idea that in situations in which multiple action options are presented simultaneously, we prepare action plans for each competing option before deciding between and executing one of those plans. However, in natural, everyday environments, our available action options frequently change from one moment to the next, and there is often uncertainty as to whether additional options will become available before having to select a particular course of action. Here, with the use of a target-directed reaching task, we show that in this situation, the brain specifies a competing action for each new, sequentially presented potential target and that recently formed action plans can be revisited and updated so as to conform with separate, more newly developed, plans. These findings indicate that the brain forms labile motor plans for sequentially arising target options that can be flexibly restructured to accommodate new motor plans. PMID:27030738

  10. Enhancing local action planning through quantitative flood risk analysis: a case study in Spain

    NASA Astrophysics Data System (ADS)

    Castillo-Rodríguez, Jesica Tamara; Escuder-Bueno, Ignacio; Perales-Momparler, Sara; Ramón Porta-Sancho, Juan

    2016-07-01

    This article presents a method to incorporate and promote quantitative risk analysis to support local action planning against flooding. The proposed approach aims to provide a framework for local flood risk analysis, combining hazard mapping with vulnerability data to quantify risk in terms of expected annual affected population, potential injuries, number of fatalities, and economic damages. Flood risk is estimated combining GIS data of loads, system response, and consequences and using event tree modelling for risk calculation. The study area is the city of Oliva, located on the eastern coast of Spain. Results from risk modelling have been used to inform local action planning and to assess the benefits of structural and non-structural risk reduction measures. Results show the potential impact on risk reduction of flood defences and improved warning communication schemes through local action planning: societal flood risk (in terms of annual expected affected population) would be reduced up to 51 % by combining both structural and non-structural measures. In addition, the effect of seasonal population variability is analysed (annual expected affected population ranges from 82 to 107 %, compared with the current situation, depending on occupancy rates in hotels and campsites). Results highlight the need for robust and standardized methods for urban flood risk analysis replicability at regional and national scale.

  11. Corrective Action Investigation plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfield, Nevada Test Site, Nevada, March 1999

    SciTech Connect

    ITLV

    1999-03-01

    The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

  12. Action for Healthy Kids Suggests that Improvements Are Needed

    ERIC Educational Resources Information Center

    Curriculum Review, 2008

    2008-01-01

    The Action for Healthy Kids (AFHK), a national non-profit group that addresses childhood obesity, released a special report warning that schools still need improvements to the quality of the foods they serve and the amount of physical activity opportunities they offer American children. The report also outlines a significant obstacle--most school…

  13. Action Research to Improve Collaboration among Student Support Services Teams

    ERIC Educational Resources Information Center

    Salm, Twyla

    2014-01-01

    This study explores action research as a professional development strategy to improve interprofessional collaboration in a school division team focused on supporting students with a variety of learning and behavioural needs. Occupational therapists, speech and language pathologists, a psychologist, and a social worker worked together to learn more…

  14. Improving Instruction in the Mathematics Methods Classroom through Action Research

    ERIC Educational Resources Information Center

    Mostofo, Jameel; Zambo, Ron

    2015-01-01

    There is a continuing emphasis in the United States on improving students' mathematical abilities, and one approach is to better prepare teachers. To investigate the potential usefulness of Lesson Study to better prepare teachers, one author set out to conduct action research on his classroom practice. Specifically, he sought to determine whether…

  15. Training of Manual Actions Improves Language Understanding of Semantically Related Action Sentences

    PubMed Central

    Locatelli, Matteo; Gatti, Roberto; Tettamanti, Marco

    2012-01-01

    Conceptual knowledge accessed by language may involve the reactivation of the associated primary sensory-motor processes. Whether these embodied representations are indeed constitutive to conceptual knowledge is hotly debated, particularly since direct evidence that sensory-motor expertise can improve conceptual processing is scarce. In this study, we sought for this crucial piece of evidence, by training naive healthy subjects to perform complex manual actions and by measuring, before and after training, their performance in a semantic language task. Nineteen participants engaged in 3 weeks of motor training. Each participant was trained in three complex manual actions (e.g., origami). Before and after the training period, each subject underwent a series of manual dexterity tests and a semantic language task. The latter consisted of a sentence-picture semantic congruency judgment task, with 6 target congruent sentence-picture pairs (semantically related to the trained manual actions), 6 non-target congruent pairs (semantically unrelated), and 12 filler incongruent pairs. Manual action training induced a significant improvement in all manual dexterity tests, demonstrating the successful acquisition of sensory-motor expertise. In the semantic language task, the reaction times (RTs) to both target and non-target congruent sentence-picture pairs decreased after action training, indicating a more efficient conceptual-semantic processing. Noteworthy, the RTs for target pairs decreased more than those for non-target pairs, as indicated by the 2 × 2 interaction. These results were confirmed when controlling for the potential bias of increased frequency of use of target lexical items during manual training. The results of the present study suggest that sensory-motor expertise gained by training of specific manual actions can lead to an improvement of cognitive-linguistic skills related to the specific conceptual-semantic domain associated to the trained actions

  16. Corrective Action Investigation Plan for Corrective Action Unit 500: Test Cell A Septic System, Nevada Test Site, Nevada

    SciTech Connect

    IT Las Vegas

    1999-01-27

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s), and may include solid waste management units, individual disposal sites, or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP will be used in conjunction with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998c), hereafter referred to as the Leachfield Work Plan. Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. This CAIP contains CAU-specific information including a facility description, environmental sample collection objectives, and the criteria for conducting site investigation activities at CAU 500. This CAIP addresses one of three leachfield systems associated with Test Cell A, which is located in Area 25 at the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (see Leachfield Work Plan Figure 1-1). Corrective Action Unit 500 is comprised of the Test Cell A Septic System (CAS 25-04-05) and the associated leachfield system presented in Figure 1-1 (FFACO, 1996).

  17. Nantucket, Ma. Climate Protection Action Plan: A Public Outreach Strategy

    NASA Astrophysics Data System (ADS)

    Petrik, C.; Stephenson, A.; Petsch, S.

    2009-12-01

    As communities and municipalities gain a better understanding of climate change, they are exploring the ways in which to work towards adaptation and mitigation. One strategy that the Island of Nantucket, Massachusetts turned toward is the drafting of a Climate Protection Action Plan (CPAP). The CPAP was developed during the summer of 2009 to meet three goals: (1) assist the Town of Nantucket in creating a framework to help them reduce CO2 emissions; (2) educate the municipality and community in techniques that promote energy efficiency and sustainability on the island; and (3) document past, present and future approaches adopted by the Town towards emissions reduction and energy sustainability. In particular, this project focused on using local strengths and natural resources identified by island stakeholders that may help the island to mitigate carbon emissions and adapt to climate change.. Drafting the CPAP provided community members and politicians with an opportunity to become better educated in the science of climate change and to learn how climate change will affect their community. On the island of Nantucket, leaders in the religious, civic, and political communities were brought into a conversation about how each group could contribute to reducing greenhouse gas emissions. A geosciences graduate student was brought into the CPAP team as a climate fellow to facilitate this conversation. This provided the foundation for stakeholder recommendations incorporated into the CPAP. This capacity-building model served as an effective way to create an informal learning environment about climate change that allowed members of the island community to directly participate in developing their locally appropriate climate protection strategy. The draft CPAP developed through this study and presented to the Town of Nantucket comprises assessments and recommendations in public research and education; building and energy efficiency; transportation; renewable energy; and carbon

  18. Aquatic ecosystem condition: The Fraser River Action Plan approach

    SciTech Connect

    Tuominen, T.; Raymond, B.; Sekela, M.; Reynoldson, T.

    1995-12-31

    A major goal of the Canadian government`s Fraser River Action Plan (FRAP) is to clean up existing pollution problems in the Fraser River Basin. In support of this goal, the Environmental Quality Assessment Program is assessing the quality of the aquatic environment, particularly with respect to contaminants. The program, conducted from 1993 to 1998, is to establish a baseline condition for the aquatic ecosystem against which the success of clean up efforts can be measured. The FRAP approach is to use a combination of contaminant exposure or stressor indicators and organism ``effects`` indicators. The focus is on three components of the aquatic ecosystem: (1) bed sediment, (2) resident fish and (3) benthos. A priority for the program is integration of the three components, wherever possible. Bed sediments, as indicators of contaminant stress, are sampled at fourteen reaches in the river and major tributaries. Two species of resident fish are sampled and analyzed for condition factors, enzyme induction, histopathology and contaminant content at each of nine sites in the basin. The resident fish data are providing a measure of contaminant exposure and effect. Organism community effects will be assessed by a study which is classifying approximately 200 tributary and mainstem sites based on benthos community structure. For the first time in a large river system in Canada, this benthos study uses a multivariate approach which relates a suite of chemical and physical characteristics to benthos community structure.

  19. Process safety management and interim or remedial action plans

    SciTech Connect

    Boss, M.J.; Henney, D.A.; Heitzman, V.K.; Day, D.W.

    1996-12-31

    Remedial Actions, including Interim Remedial Activities, often require the use of treatment facilities or stabilization techniques using on-site chemical processes. As such, the 29 CFR 1910.119 Process Safety Management (PSM) of Highly Hazardous Chemicals (PSM Standard) and the USEPA regulations for Risk Management Planning require that these chemicals and their attendant potential hazards be identified. A Hazard and Operation (HAZOP) study, Failure Mode and Effect Analysis (FMEA), Fault Tree Analysis, or equivalent graphic presentation of processes must be completed. These studies form a segment of the Process Hazard Analysis (PHA). HAZOP addresses each system and each element of a system that could deviate from normal operations and thus cause a hazard. A full assessment of each process is produced by looking at the hazards, consequences, causes and personnel protection needed. Many variables must be considered when choosing the appropriate PHA technique including the size of the plant, the number of processes, the types of processes, and the types of chemicals used. A mixture of these techniques may be required to adequately transmit information about the process being evaluated.

  20. The Upstream Hospital Leader: Taking Action to Improve Population Health.

    PubMed

    Graham, Ross; Meili, Ryan

    2016-01-01

    Canadian hospital leaders face numerous barriers when they seek to work upstream in an effort to improve population health. A noted challenge is lack of role clarity. We introduce the concept of an "upstream hospital leader" in an attempt to address this challenge, and suggest behaviours for how this role can advance population health at the individual, organizational and health system levels. These suggestions aim to contribute to the ongoing conversation and growing interest in the role of hospitals in population health improvement. We invite feedback on these suggestions and encourage leaders to explore opportunities where greater upstream action by their hospital and health system can improve population health. PMID:27009704

  1. The Role of Cue-Response Mapping in Motorvisual Impairment and Facilitation: Evidence for Different Roles of Action Planning and Action Control in Motorvisual Dual-Task Priming

    ERIC Educational Resources Information Center

    Thomaschke, Roland; Hopkins, Brian; Miall, R. Christopher

    2012-01-01

    Previous research has shown that actions impair the visual perception of categorically action-consistent stimuli. On the other hand, actions can also facilitate the perception of spatially action-consistent stimuli. We suggest that motorvisual impairment is due to action planning processes, while motorvisual facilitation is due to action control…

  2. SNF Project Engineering Process Improvement Plan

    SciTech Connect

    DESAI, S.P.

    2000-02-09

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities.

  3. Improving Work Life Through Effective Performance Planning

    ERIC Educational Resources Information Center

    Duemer, Walter C.; And Others

    1978-01-01

    The study suggests that the quality of life at work can be enhanced through effective performance planning by employees and that this planning can also reduce the amount of job-related stress employees experience. (Author/IRT)

  4. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    SciTech Connect

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  5. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-04-01

    6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005).

  6. Action Plan on Communication Practices: Roles of Tutors at EMU Distance Education Institute to Overcome Social Barriers in Constructing Knowledge

    ERIC Educational Resources Information Center

    Aksal, Fahriye A.

    2009-01-01

    The research involved an action plan for the improvement of the quality of the Distance Education Institute of Eastern Mediterranean University and based on EUA norms. This research is part of a work based learning process to enhance the contribution of online pedagogy and teaching process for online tutors. The research aimed to stress the…

  7. The Assessment of a Tutoring Program to Meet CAS Standards Using a SWOT Analysis and Action Plan

    ERIC Educational Resources Information Center

    Fullmer, Patricia

    2009-01-01

    This article summarizes the use of SWOT (Strengths, Weaknesses, Opportunities, and Threats) analysis and subsequent action planning as a tool of self-assessment to meet CAS (Council for the Advancement of Standards in Higher Education) requirements for systematic assessment. The use of the evaluation results to devise improvements to increase the…

  8. Needed improvements in the development of systemic corrective actions.

    SciTech Connect

    Campisi, John A.

    2009-07-01

    There are indications that corrective actions, as implemented at Sandia National Laboratories are not fully adequate. Review of independent audits spanning multiple years provides evidence of recurring issues within the same or similar operations and programs. Several external audits have directly called into question the ability Sandia's assessment and evaluation processes to prevent recurrence. Examples of repeated findings include lockout/tagout programs, local exhaust ventilation controls and radiological controls. Recurrence clearly shows that there are underlying systemic factors that are not being adequately addressed by corrective actions stemming from causal analyses. Information suggests that improvements in the conduct of causal analyses and, more importantly, in the development of subsequent corrective actions are warranted. Current methodolgies include Management Oversight Risk Tree, developed in the early 1970s and Systemic Factors Analysis. Recommendations for improvements include review of other causal analysis systems, training, improved formality of operations, improved documentation, and a corporate method that uses truly systemic solutions. This report was written some years ago and is being published now to form the foundation for current, follow-on reports being developed. Some outdated material is recognized but is retained for report completeness.

  9. NFE--Planning and Organizing for Action. Courier No. 27.

    ERIC Educational Resources Information Center

    ASPBAE Courier Service, 1983

    1983-01-01

    This issue contains six articles, reports, and essays on planning and organizing nonformal education in the Asian-South Pacific area. A chapter reprinted from "Planning Nonformal Education" discusses the need for planning, past efforts, and five steps in a strategy suggested for planning locally-oriented and target-specific nonformal educational…

  10. Action Mapping: A Planning Tool for Change. HSLA Monograph.

    ERIC Educational Resources Information Center

    Matsui, Bruce

    Future leaders will have to rely upon skills that are far different from those used in the past. Action mapping serves as a meta-process for moving schools toward desired ends; it calls upon school leaders to move into action, to reflect upon such actions, and to collect stories for future reflections. This process could be helpful to a school…

  11. Gathering Strength: Canada's Aboriginal Action Plan. A Progress Report = Rassembler nos forces: Le plan d'action du Canada pour les questions autochtones. Rapport d'etape.

    ERIC Educational Resources Information Center

    Department of Indian Affairs and Northern Development, Ottawa (Ontario).

    Gathering Strength is an integrated government-wide plan to address the key challenges facing Canada's Aboriginal people. Following an initial section on reconciliation of historic grievances, this report describes initiatives in the four areas addressed by the action plan: (1) partnerships (all schools received public awareness materials;…

  12. Toward a Theoretical Framework for Understanding the Relationship between Situated Action and Planned Action Models of Behavior in Information Retrieval Contexts: Contributions from Phenomenology.

    ERIC Educational Resources Information Center

    Ng, Kwong Bor

    2002-01-01

    Discussion of human-computer interaction and planned action focuses on the belief that it is impossible to consider an action without an a priori plan, even according to the phenomenological position taken for granted by the situated action theory. Reports results of a quasi-experiment that focused on plan deviation within an information seeking…

  13. Implementation of the Every Newborn Action Plan: Progress and lessons learned.

    PubMed

    Kinney, Mary V; Cocoman, Olive; Dickson, Kim E; Daelmans, Bernadette; Zaka, Nabila; Rhoda, Natasha R; Moxon, Sarah G; Kak, Lily; Lawn, Joy E; Khadka, Neena; Darmstadt, Gary L

    2015-08-01

    Progress in reducing newborn mortality has lagged behind progress in reducing maternal and child deaths. The Every Newborn Action Plan (ENAP) was launched in 2014, with the aim of achieving equitable and high-quality coverage of care for all women and newborns through links with other global and national plans and measurement and accountability frameworks. This article aims to assess country progress and the mechanisms in place to support country implementation of the ENAP. A country tracking tool was developed and piloted in October-December 2014 to collect data on the ENAP-related national milestones and implementation barriers in 18 high-burden countries. Simultaneously, a mapping exercise involving 47 semi-structured interviews with partner organizations was carried out to frame the categories of technical support available in countries to support care at and around the time of birth by health system building blocks. Existing literature and reports were assessed to further supplement analysis of country progress. A total of 15 out of 18 high-burden countries have taken concrete actions to advance newborn health; four have developed specific action plans with an additional six in process and a further three strengthening newborn components within existing plans. Eight high-burden countries have a newborn mortality target, but only three have a stillbirth target. The ENAP implementation in countries is well-supported by UN agencies, particularly UNICEF and WHO, as well as multilateral and bilateral agencies, especially in health workforce training. New financial commitments from development partners and the private sector are substantial but tracking of national funding remains a challenge. For interventions with strong evidence, low levels of coverage persists and health information systems require investment and support to improve quality and quantity of data to guide and track progress. Some of the highest burden countries have established newborn health

  14. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    SciTech Connect

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  15. 23 CFR Appendix B to Subpart D of... - Sample Corrective Action Plan

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Sample Corrective Action Plan B Appendix B to Subpart D... EXTERNAL PROGRAMS Construction Contract Equal Opportunity Compliance Procedures Pt. 230, Subpt. D, App. B Appendix B to Subpart D of Part 230—Sample Corrective Action Plan Deficiency 1: Sources likely to...

  16. Action Planning in Typically and Atypically Developing Children (Unilateral Cerebral Palsy)

    ERIC Educational Resources Information Center

    Craje, Celine; Aarts, Pauline; Nijhuis-van der Sanden, Maria; Steenbergen, Bert

    2010-01-01

    In the present study, we investigated the development of action planning in children with unilateral Cerebral Palsy (CP, aged 3-6 years, n = 24) and an age matched control group. To investigate action planning, participants performed a sequential movement task. They had to grasp an object (a wooden play sword) and place the sword in a hole in a…

  17. How You Move Is What You See: Action Planning Biases Selection in Visual Search

    ERIC Educational Resources Information Center

    Wykowska, Agnieszka; Schubo, Anna; Hommel, Bernhard

    2009-01-01

    Three experiments investigated the impact of planning and preparing a manual grasping or pointing movement on feature detection in a visual search task. The authors hypothesized that action planning may prime perceptual dimensions that provide information for the open parameters of that action. Indeed, preparing for grasping facilitated detection…

  18. 40 CFR 77.4 - Administrator's action on proposed offset plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Administrator's action on proposed offset plans. 77.4 Section 77.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) EXCESS EMISSIONS § 77.4 Administrator's action on proposed offset plans....

  19. A Strategic Action Plan for Advancing Math and Science Education in New Mexico 2007-2010

    ERIC Educational Resources Information Center

    New Mexico Public Education Department, 2007

    2007-01-01

    This Strategic Action Plan for Advancing Math and Science Education is an initial outline of strategies, actions, measures of progress, resources needed, timelines, and responsible parties. The Plan focuses on these three main goals: (1) increasing student interest, participation, and achievement in math and science; (2) raising public support and…

  20. Using Action Plans to Support Communication Programming for Children Who Are Deafblind

    ERIC Educational Resources Information Center

    Bruce, Susan M.

    2008-01-01

    The author describes the use of action plans to support 2 teachers' post-in-service implementation of communication strategies with 3 children who are deafblind. In the action plans, the teachers recorded changes in thinking and instructional practices under the 4 aspects of communication: form, function, content, and context. They also recorded…

  1. 24 CFR 248.233 - Approval of a plan of action that includes incentives.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING ACT AND OTHER AUTHORITIES PREPAYMENT OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income Preservation Act of 1987 § 248.233 Approval of a plan of action...— (1) The housing will be retained as housing affordable for very low income families,...

  2. 23 CFR Appendix B to Subpart D of... - Sample Corrective Action Plan

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... EXTERNAL PROGRAMS Construction Contract Equal Opportunity Compliance Procedures Pt. 230, Subpt. D, App. B Appendix B to Subpart D of Part 230—Sample Corrective Action Plan Deficiency 1: Sources likely to yield... 23 Highways 1 2011-04-01 2011-04-01 false Sample Corrective Action Plan B Appendix B to Subpart...

  3. 45 CFR 1355.35 - Program improvement plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... included in the annual reviews and progress reports related to the CFSP required in 45 CFR 1357.16. ... MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL § 1355.35 Program improvement... conformity shall develop a program improvement plan. The program improvement plan must: (i) Be...

  4. 34 CFR 200.41 - School improvement plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 1 2011-07-01 2011-07-01 false School improvement plan. 200.41 Section 200.41... Basic Programs Operated by Local Educational Agencies Lea and School Improvement § 200.41 School improvement plan. (a)(1) Not later than three months after an LEA has identified a school for...

  5. 34 CFR 200.41 - School improvement plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false School improvement plan. 200.41 Section 200.41... Basic Programs Operated by Local Educational Agencies Lea and School Improvement § 200.41 School improvement plan. (a)(1) Not later than three months after an LEA has identified a school for...

  6. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    SciTech Connect

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  7. Coal without carbon: an investment plan for federal action

    SciTech Connect

    Pettus, A.; Tatsutani, M.

    2009-09-15

    This study examines several technologies for CCS that are not currently receiving adequate development support but that could - in the right policy environment - provide the kind of significant cost reductions (and significant improvements in efficiency) that could greatly accelerate broad, economically attractive CCS deployment. Clean Air Task Force selected these technology areas (though not the technologies themselves) and solicited reports from experts in each field to explore how these technologies might fit into a broader CCS deployment strategy. Each expert was asked to develop a research, development, and demonstration (RD&D) 'road map' that could efficiently move each technology from the laboratory into the commercial mainstream. Because the chapter authors are either technical experts or commercial players and are not, for the most part, energy policy experts, subsequent work will translate their RD&D recommendations into actionable policy proposals. The heart of this report consists of four chapters on advanced coal and CCS technologies: underground coal gasification (UCG), written by Julio Friedmann at Lawrence Livermore National Laboratory; Next generation coal gasification (surface-based gasification) led by Eric Redman at Summit Power Group; Advanced technologies for post-combustion capture (PCC) of CO{sub 2}, led by Howard Herzog at Massachusetts Institute of Technology; and RD&D to speed commercialization of geological CO{sub 2} sequestration (GCS), led by Julio Friedmann. 12 refs., 5 figs., 2 tabs.

  8. Action Research to Support the Sustainability of Strategic Planning

    ERIC Educational Resources Information Center

    Antheil, Jane H.; Spinelli, Stephen, Jr.

    2011-01-01

    This article suggests that developing a strategic plan, even through a highly participative and data-driven process, is not sufficient to sustain change if implementation of the plan is not monitored as an organizational change event. To the degree that a strategic plan is institutionally transformative, monitoring change during implementation…

  9. M.A.P.S.: Mesa Action Planning System.

    ERIC Educational Resources Information Center

    Larson, Elizabeth J. Hunt

    This report describes implementation of a districtwide planning model in the Mesa, Arizona, Public Schools. Figures illustrate planning processes throughout the report. Intended as an implementive framework, the planning system's purposes are to assist decision making about resource allocation, program direction, progress measurement, and district…

  10. Improved Planning Time and Plan Quality Through Multicriteria Optimization for Intensity-Modulated Radiotherapy

    SciTech Connect

    Craft, David L.; Hong, Theodore S.; Shih, Helen A.; Bortfeld, Thomas R.

    2012-01-01

    Purpose: To test whether multicriteria optimization (MCO) can reduce treatment planning time and improve plan quality in intensity-modulated radiotherapy (IMRT). Methods and Materials: Ten IMRT patients (5 with glioblastoma and 5 with locally advanced pancreatic cancers) were logged during the standard treatment planning procedure currently in use at Massachusetts General Hospital (MGH). Planning durations and other relevant planning information were recorded. In parallel, the patients were planned using an MCO planning system, and similar planning time data were collected. The patients were treated with the standard plan, but each MCO plan was also approved by the physicians. Plans were then blindly reviewed 3 weeks after planning by the treating physician. Results: In all cases, the treatment planning time was vastly shorter for the MCO planning (average MCO treatment planning time was 12 min; average standard planning time was 135 min). The physician involvement time in the planning process increased from an average of 4.8 min for the standard process to 8.6 min for the MCO process. In all cases, the MCO plan was blindly identified as the superior plan. Conclusions: This provides the first concrete evidence that MCO-based planning is superior in terms of both planning efficiency and dose distribution quality compared with the current trial and error-based IMRT planning approach.

  11. Higher-order action planning for individual and joint object manipulations.

    PubMed

    Meyer, Marlene; van der Wel, Robrecht P R D; Hunnius, Sabine

    2013-04-01

    Many actions involve multiple action steps, which raises the question how far ahead people plan when they perform such actions. Here, we examined higher-order planning for action sequences and whether people planned similarly or differently when acting individually or together with an action partner. For individual performances, participants picked up an object with one hand and passed it to their other hand before placing it onto a target location. For joint performances, they picked up the object and handed it to their action partner, who placed it onto the target location. Each object could be grasped at only two possible grasping positions, implying that the first selected grasp on the object determined the postures for the rest of the action sequence. By varying the height of the target shelf, we tested whether people planned ahead and modulated their grasp choices to avoid uncomfortable end postures. Our results indicated that participants engaged in higher-order planning, but needed task experience before demonstrating such planning during both individual and joint performances. The rate of learning was similar in the two conditions, and participants transferred experience from individual to joint performance. Our results indicate similarity in mechanisms underlying individual and joint action sequence planning. PMID:23361302

  12. Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1

    SciTech Connect

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

  13. Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David A. Strand

    2004-10-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554.

  14. Improved Virtual Planning for Bimaxillary Orthognathic Surgery.

    PubMed

    Hatamleh, Muhanad; Turner, Catherine; Bhamrah, Gurprit; Mack, Gavin; Osher, Jonas

    2016-09-01

    Conventional model surgery planning for bimaxillary orthognathic surgery can be laborious, time-consuming and may contain potential errors; hence three-dimensional (3D) virtual orthognathic planning has been proven to be an efficient, reliable, and cost-effective alternative. In this report, the 3D planning is described for a patient presenting with a Class III incisor relationship on a Skeletal III base with pan facial asymmetry complicated by reverse overjet and anterior open bite. A combined scan data of direct cone beam computer tomography and indirect dental scan were used in the planning. Additionally, a new method of establishing optimum intercuspation by scanning dental casts in final occlusion and positioning it to the composite-scans model was shown. Furthermore, conventional model surgery planning was carried out following in-house protocol. Intermediate and final intermaxillary splints were produced following the conventional method and 3D printing. Three-dimensional planning showed great accuracy and treatment outcome and reduced laboratory time in comparison with the conventional method. Establishing the final dental occlusion on casts and integrating it in final 3D planning enabled us to achieve the best possible intercuspation. PMID:27428909

  15. A soil plan of action to awaken society beyond 2015

    NASA Astrophysics Data System (ADS)

    Jones, Arwyn; Bampa, Francesca; Towers, Willie; Broll, Gabrielle; Vargas, Ronald

    2014-05-01

    suite of positive examples offered by soil enthusiasts is to provide a common platform appropriate to all parts of the world, with a common consensus on soil issues to be covered and be brought to the table of consumers. The Global Soil Partnership (GSP) is an interactive, responsive and voluntary partnership, open to governments, regional organizations, institutions and other stakeholders. One of the pillars of action aims to "Encourage investment, technical cooperation, policy, education awareness and extension in soil". In order to achieve this goal, a small regionally balanced committee was formed following the 3rd European Network on Soil Awareness conference in Aberdeen and the 2nd Global Soil Week in Berlin. This group produced a draft plan of action that will be submitted to the Intergovernmental technical Panel on Soils (ITPS) of the GSP. Some key points that we need to address are: finding new soil communicators to awake and engage the society and the political arena (e.g. actors, poets, artists, etc.); focusing on a harmonised public perception of soil and their importance for environment and society; re-introducing soil science into the school curricula as a cross-cutting discipline designing a coherent but flexible structure and ensuring a proper and logical constructive transition between each learning stage (e.g. training teachers, web-based courses/ web-based platform, etc.). REFERENCES Bouma J, Broll G, Crane TA, Dewitte O, Gardi C, Schulte RPO, Towers W (2012) Soil information in support of policy making and awareness raising. Current Opinion in Environmental Sustainability, 4, 552-558. EC (2006) (COM(2006)231 final) Communication from the Commission to the Council, the European Parliament, the European Economic and Social Committee of the Regions, Thematic Strategy for Soil Protection. (ed Commission E), Brussels, Belgium.

  16. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    NASA Technical Reports Server (NTRS)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  17. I Plan Therefore I Choose: Free-Choice Bias Due to Prior Action-Probability but Not Action-Value

    PubMed Central

    Suriya-Arunroj, Lalitta; Gail, Alexander

    2015-01-01

    According to an emerging view, decision-making, and motor planning are tightly entangled at the level of neural processing. Choice is influenced not only by the values associated with different options, but also biased by other factors. Here we test the hypothesis that preliminary action planning can induce choice biases gradually and independently of objective value when planning overlaps with one of the potential action alternatives. Subjects performed center-out reaches obeying either a clockwise or counterclockwise cue-response rule in two tasks. In the probabilistic task, a pre-cue indicated the probability of each of the two potential rules to become valid. When the subsequent rule-cue unambiguously indicated which of the pre-cued rules was actually valid (instructed trials), subjects responded faster to rules pre-cued with higher probability. When subjects were allowed to choose freely between two equally rewarded rules (choice trials) they chose the originally more likely rule more often and faster, despite the lack of an objective advantage in selecting this target. In the amount task, the pre-cue indicated the amount of potential reward associated with each rule. Subjects responded faster to rules pre-cued with higher reward amount in instructed trials of the amount task, equivalent to the more likely rule in the probabilistic task. Yet, in contrast, subjects showed hardly any choice bias and no increase in response speed in favor of the original high-reward target in the choice trials of the amount task. We conclude that free-choice behavior is robustly biased when predictability encourages the planning of one of the potential responses, while prior reward expectations without action planning do not induce such strong bias. Our results provide behavioral evidence for distinct contributions of expected value and action planning in decision-making and a tight interdependence of motor planning and action selection, supporting the idea that the underlying

  18. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... three elements: a reasonable self analysis; a reasonable basis for concluding action is appropriate; and reasonable action. (a) Reasonable self analysis. The objective of a self analysis is to determine whether... analysis. The employer may utilize techniques used in order to comply with Executive Order 11246,...

  19. Alternatives/action plan report for outfall 17

    SciTech Connect

    1994-11-01

    This Document contains information pertaining to alternatives/action associated with controlling ammonia entering through outfall 17. This document identifies the location of contaminate source, the ammonia concentration levels entering East Fork Poplar Creek, and the action taken to reduce/eliminate the toxicity problem.

  20. Connecting the Dots--From Planning to Implementation: Translating Commitments into Action in a Strategic Planning Process

    ERIC Educational Resources Information Center

    Mieso, Rob Roba

    2010-01-01

    This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…

  1. Climatic Action Plan Project for the state of Veracruz (Mexico)

    NASA Astrophysics Data System (ADS)

    Tejeda, A.; Ochoa, C.

    2007-05-01

    With financing of the British Government and support of the National Institute of Ecology, from April of 2006 to March of 2008 an action plan which intends variability effects and climatic change for the state of Veracruz will be made. This plan will be taken to the state government and will be spread out to manufacturers, industrialists and population. Throughout the Gulf of Mexico, the state of Veracruz is a 745 km coast in length with a width that goes from 156 km in the center to 47 km in the north. The state has large mountains, forests, plains, rivers, cascades, lagoons and coasts. Veracruz is the 10th largest state in Mexico with a 72,420 km2 surface, it is located between 17°00' and 22°28' north latitude and between 93°95' and 98°38' west longitude. Because of the orographic effect, the Sierra Madre Oriental causes the existence of many types of climate, from dry to tropical forest, going through snow on the top of the Pico de Orizaba (5747m of altitude). The wind affects the coasts by not allowing to fish during a hundred days a year (particularly in winter), and on summer tropical waves and occasionally hurricanes affect rivers causing overflow and urban floods in fields. These phenomena do not have a regular affectation; they are subject to climate variability effects. Veracruz is the third state with most population in the country (7.1 million people in 2005), only surpassed by the state of Mexico and Mexico City. Although it occupies 3.7% of the national territory, Veracruz has 6.9% of human population in the country, and is the 6th state of PIB national contribution (240 thousands of millions pesos approximately). Of the possible effects of the climatic change the following can be expected: , , : Most of the coasts of the Gulf of Mexico, low and sandy, less of a meter on the sea level, represent the most vulnerable territory of Veracruz. Towns will be affected, the saline water will infiltrate until the phreatic mantles and the coast electrical

  2. Improving Remedial Planning Performance: The Rattlesnake Creek Experience

    SciTech Connect

    Rieman, C.R.; Spector, H.L.; Andrews, S.M.; Durham, L. A.; Johnson, R. L.; Racino, R. R.

    2006-07-01

    The U.S. Army Corps of Engineers (USACE), Buffalo District, has responsibility for characterizing and remediating radiologically contaminated properties under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Most of these FUSRAP sites include radionuclide contamination in soils where excavation and offsite disposal is the selected remedial action. For many FUSRAP soil remediation projects completed to date, the excavated contaminated soil volumes have significantly exceeded the pre-excavation volume estimates that were developed for project planning purposes. The exceedances are often attributed to limited and sparse datasets that are used to calculate the initial volume estimates. These volume exceedances complicate project budgeting and planning. Building on these experiences, the USACE took a different approach in the remediation of Rattlesnake Creek, located adjacent to the Ashland 2 site, in Tonawanda, New York. This approach included a more extensive pre-design data collection effort to improve and reduce the uncertainty in the pre-excavation volume estimates, in addition to formalizing final status survey data collection strategies prior to excavation. The final status survey sampling was fully integrated with the pre-design data collection, allowing dual use of the pre-design data that was collected (i.e., using the data to close out areas where contamination was not found, and feeding the data into volume estimates when contamination was encountered). The use of real-time measurement techniques (e.g., X-ray fluorescence [XRF] and gamma walkover surveys) during pre-excavation data collection allowed the USACE to identify and respond to unexpected contamination by allocating additional data collection to characterizing new areas of concern. The final result was an estimated soil volume and excavation footprint with a firm technical foundation and a reduction in uncertainty. However, even with extensive pre-design data collection, additional

  3. Feasibility of a smartphone application based action plan and monitoring in asthma

    PubMed Central

    Kim, Mi-Yeong; Lee, Suh-Young; Jo, Eun-Jung; Lee, Seung-Eun; Kang, Min-Gyu; Song, Woo-Jung; Kim, Sae-Hoon; Cho, Sang-Heon; Min, Kyung-Up; Ahn, Ki-Hwan

    2016-01-01

    Background Asthma patients may experience acute episodic exacerbation. The guidelines recommend that written action plan should be given to asthma patients. However, no one can predict when and where acute exacerbation will happen. As people carry smart phone almost anytime and anywhere, smartphone application could be a useful tool in asthma care. We evaluated the feasibility of the ubiquitous healthcare system of asthma care using a smartphone application (snuCare) based on the self-management guideline or action plan. Methods Forty-four patients including fragile asthmatics were enrolled from Seoul National University Bundang Hospital between December 2011 and February 2012. They were randomly assigned into application user (n = 22) or application nonuser group (n = 22). We evaluated user-satisfaction, and clinical parameters such as asthma control, Quality of Life Questionnaire for Adult Korean Asthmatics, and the adherence of patients. Results The characteristics were similar at baseline between the 2 groups except those who treated with short-term systemic steroid or increased dose of systemic steroid during previous 8 weeks (user vs. nonuser: 31.8% vs. 4.5%, p = 0.020). Total of 2,226 signals was generated during 8 weeks including 5 risky states. After eight weeks, the users answered that it was very easy to use the application, which was shown in highest scores in terms of satisfaction (mean ± standard deviation, 4.3 ± 0.56). Seventy-three percent of patients answered that the application was very useful for asthma care. User group showed improved the adherence scores (p = 0.017). One patient in application user group could avoid Emergency Department visit owing to the application while a patient in nonuser group visited Emergency Department. Conclusion The ubiquitous healthcare system using a smartphone application (snuCare) based on the self-management guideline or action plan could be helpful in the monitoring and the management of asthma. PMID

  4. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

  5. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    SciTech Connect

    T. M. Fitzmaurice

    2000-08-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

  6. Modeling the Maturation of Grip Selection Planning and Action Representation: Insights from Typical and Atypical Motor Development.

    PubMed

    Fuelscher, Ian; Williams, Jacqueline; Wilmut, Kate; Enticott, Peter G; Hyde, Christian

    2016-01-01

    We investigated the purported association between developmental changes in grip selection planning and improvements in an individual's capacity to represent action at an internal level [i.e., motor imagery (MI)]. Participants were groups of healthy children aged 6-7 years and 8-12 years respectively, while a group of adolescents (13-17 years) and adults (18-34 years) allowed for consideration of childhood development in the broader context of motor maturation. A group of children aged 8-12 years with probable DCD (pDCD) was included as a reference group for atypical motor development. Participants' proficiency to generate and/or engage internal action representations was inferred from performance on the hand rotation task, a well-validated measure of MI. A grip selection task designed to elicit the end-state comfort (ESC) effect provided a window into the integrity of grip selection planning. Consistent with earlier accounts, the efficiency of grip selection planning followed a non-linear developmental progression in neurotypical individuals. As expected, analysis confirmed that these developmental improvements were predicted by an increased capacity to generate and/or engage internal action representations. The profile of this association remained stable throughout the (typical) developmental spectrum. These findings are consistent with computational accounts of action planning that argue that internal action representations are associated with the expression and development of grip selection planning across typical development. However, no such association was found for our sample of children with pDCD, suggesting that individuals with atypical motor skill may adopt an alternative, sub-optimal strategy to plan their grip selection compared to their same-age control peers. PMID:26903915

  7. Modeling the Maturation of Grip Selection Planning and Action Representation: Insights from Typical and Atypical Motor Development

    PubMed Central

    Fuelscher, Ian; Williams, Jacqueline; Wilmut, Kate; Enticott, Peter G.; Hyde, Christian

    2016-01-01

    We investigated the purported association between developmental changes in grip selection planning and improvements in an individual’s capacity to represent action at an internal level [i.e., motor imagery (MI)]. Participants were groups of healthy children aged 6–7 years and 8–12 years respectively, while a group of adolescents (13–17 years) and adults (18–34 years) allowed for consideration of childhood development in the broader context of motor maturation. A group of children aged 8–12 years with probable DCD (pDCD) was included as a reference group for atypical motor development. Participants’ proficiency to generate and/or engage internal action representations was inferred from performance on the hand rotation task, a well-validated measure of MI. A grip selection task designed to elicit the end-state comfort (ESC) effect provided a window into the integrity of grip selection planning. Consistent with earlier accounts, the efficiency of grip selection planning followed a non-linear developmental progression in neurotypical individuals. As expected, analysis confirmed that these developmental improvements were predicted by an increased capacity to generate and/or engage internal action representations. The profile of this association remained stable throughout the (typical) developmental spectrum. These findings are consistent with computational accounts of action planning that argue that internal action representations are associated with the expression and development of grip selection planning across typical development. However, no such association was found for our sample of children with pDCD, suggesting that individuals with atypical motor skill may adopt an alternative, sub-optimal strategy to plan their grip selection compared to their same-age control peers. PMID:26903915

  8. Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-04-06

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  9. Institutional frameworks to direct development and implementation of great lakes remedial action plans

    NASA Astrophysics Data System (ADS)

    Hartig, John H.; Law, Neely

    1994-11-01

    Locally designed, institutional frameworks are being used to develop and implement remedial action plans (RAPs) to restore beneficial uses in 43 Great Lakes areas of concern. A 1993 Canada-United States roundtable was convened to learn from case studies and to develop recommendations regarding essential characteristics of RAP institutional frameworks, guidance to ensure linkages to other related plans, and ways of embracing new institutional frameworks from RAP development to implementation. Major roundtable recommendations are: (1) RAP institutional frameworks should be empowered to pursue their mission of restoring uses. Empowerment would be demonstrated by: a watershed focus, inclusive and shared decision-making, clear responsibilities and sufficient authority, creative funding capability, flexibility and continuity in the process, an iterative process of continuous improvement, and commitment to education and outreach. (2) RAP institutional frameworks should be used as mechanisms to coordinate programs at the local level. Such local coordination should be complemented with governmental commitments to intra- and interagency coordination in work plans. (3) RAP institutional frameworks can help build the capacity of governments to achieve their goals. Therefore, governments must adopt long-term, visionary goals and commit to a customer-driven RAP process of continuous improvement.

  10. Taking the Guesswork Out of Affirmative Action Planning

    ERIC Educational Resources Information Center

    Flast, Robert H.

    1977-01-01

    Noting that government agencies can better measure a company's compliance with affirmative action policies if the company uses predictive techniques, two such techniques--the flow model and the optimizing--are described and briefly compared. (SH)

  11. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    SciTech Connect

    Golder Associates, Inc.

    2003-04-22

    The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a result of

  12. Seven Action Plans for Tightening School-Community Connections: A Roll-Up-Your Sleeves Series for Home, School, and Community Practitioners.

    ERIC Educational Resources Information Center

    Thompson, Scott

    1993-01-01

    Describes the School-Community Connection Conference held in Flint (Michigan) on October 11-13, 1992, and the action plans that seven participating schools devised to improve the relationship between schools and their communities. The conference paired representatives from the state departments of education with school-based action teams to…

  13. Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0

    SciTech Connect

    Susan Evans

    2004-11-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release

  14. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    ERIC Educational Resources Information Center

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  15. Integrating Planning, Assessment, and Improvement in Higher Education

    ERIC Educational Resources Information Center

    Sherlock, Barbara J.

    2009-01-01

    Based on Penn State's popular "Innovation Insights" series, this book brings together in one handy reference nearly a decade of tried and true insights into continuous quality improvements in higher education. Their five-step model for integrating planning, assessment, and improvement moves plans off the shelf and into the weekly and daily…

  16. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Quality improvement plan (QIP) requirements. 64.8 Section 64.8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a) Based on the results of a...

  17. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Quality improvement plan (QIP) requirements. 64.8 Section 64.8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a) Based on the results of a...

  18. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Quality improvement plan (QIP) requirements. 64.8 Section 64.8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements....

  19. School Improvement Planning: What's Missing? A Center Policy Report

    ERIC Educational Resources Information Center

    Center for Mental Health in Schools at UCLA, 2005

    2005-01-01

    Few would argue against the idea of planning and implementing improvements to the nation's schools. This report contends, school improvement planning processes have frequently not been conceived in ways likely to produce desired learning outcomes for many students. The analyses presented in this report focus on a lack of attention to how schools…

  20. Planning, preparation, execution, and imagery of volitional action.

    PubMed

    Deecke, L

    1996-03-01

    There are different motor sets, which a human subject can be in or act from: he or she can be in a self-initiated voluntary movement set (action) or in a response set (re-action). Also, imagery sets are available that are necessary for the acquisition and practice of skill. Most important are such imagery sets for rehearsal in theatre, dance, music, sports, combat, etc. PMID:8713545

  1. A Social-Action Approach for Planning Education.

    ERIC Educational Resources Information Center

    Bolan, Richard S.; And Others

    The growing complexity of urban industrial society necessitates adequate planning techniques to insure future livability, but traditional methods of training planners have emphasized technology and ignored the human element. To remedy this deficiency, training programs should be expanded to include the social and political aspects of planning.…

  2. Multi-Action Planning for Threat Management: A Novel Approach for the Spatial Prioritization of Conservation Actions

    PubMed Central

    Cattarino, Lorenzo; Hermoso, Virgilio; Carwardine, Josie; Kennard, Mark J.; Linke, Simon

    2015-01-01

    Planning for the remediation of multiple threats is crucial to ensure the long term persistence of biodiversity. Limited conservation budgets require prioritizing which management actions to implement and where. Systematic conservation planning traditionally assumes that all the threats in priority sites are abated (fixed prioritization approach). However, abating only the threats affecting the species of conservation concerns may be more cost-effective. This requires prioritizing individual actions independently within the same site (independent prioritization approach), which has received limited attention so far. We developed an action prioritization algorithm that prioritizes multiple alternative actions within the same site. We used simulated annealing to find the combination of actions that remediate threats to species at the minimum cost. Our algorithm also accounts for the importance of selecting actions in sites connected through the river network (i.e., connectivity). We applied our algorithm to prioritize actions to address threats to freshwater fish species in the Mitchell River catchment, northern Australia. We compared how the efficiency of the independent and fixed prioritization approach varied as the importance of connectivity increased. Our independent prioritization approach delivered more efficient solutions than the fixed prioritization approach, particularly when the importance of achieving connectivity was high. By spatially prioritizing the specific actions necessary to remediate the threats affecting the target species, our approach can aid cost-effective habitat restoration and land-use planning. It is also particularly suited to solving resource allocation problems, where consideration of spatial design is important, such as prioritizing conservation efforts for highly mobile species, species facing climate change-driven range shifts, or minimizing the risk of threats spreading across different realms. PMID:26020794

  3. Corrective Action Investigation Plan for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David A. Strand

    2004-09-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 145: Wells and Storage Holes. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 145 is located in Area 3 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 145 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-20-01, Core Storage Holes; (2) 03-20-02, Decon Pad and Sump; (3) 03-20-04, Injection Wells; (4) 03-20-08, Injection Well; (5) 03-25-01, Oil Spills; and (6) 03-99-13, Drain and Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. One conceptual site model with three release scenario components was developed for the six CASs to address all releases associated with the site. The sites will be investigated based on data quality objectives (DQOs) developed on June 24, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQOs process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 145.

  4. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA

    SciTech Connect

    BECHTEL NEVADA

    2005-06-01

    Corrective Action Unit (CAU) 528: Polychlorinated Biphenyls Contamination is listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996) and is located in Area 25 of the Nevada Test Site. CAU 528 was created to address polychlorinated biphenyl (PCB) contamination identified during the CAU 262 corrective action investigation. CAU 528 consists of one Corrective Action Site (CAS): CAS 25-27-03, Polychlorinated Biphenyls Surface Contamination.

  5. Improving Consumer Information for Higher Education Planning

    ERIC Educational Resources Information Center

    Herndon, M. Craig

    2012-01-01

    It is a historically held principle of microeconomics that in the presence of better information, consumers make better decisions. This chapter focuses on information to guide consumers in making decisions about higher education. It examines the development and implementation of a one-stop career and college planning tool that leverages existing…

  6. Highlights of the Fourth Canadian Symposium on Hepatitis C: Moving towards a National Action Plan

    PubMed Central

    Sagan, Selena M.; Dupont, Benoit; Grebely, Jason; Krajden, Mel; MacParland, Sonya A.; Raven, Jennifer F.; Saeed, Sahar; Feld, Jordan J.; Tyrrell, D. Lorne; Wilson, Joyce A.

    2016-01-01

    Hepatitis C virus (HCV) affects at least 268,000 Canadians and causes greater disease burden than any other infectious disease in the country. The Canadian Institutes of Health Research (CIHR) and the Public Health Agency of Canada (PHAC) have identified HCV-related liver disease as a priority. In 2015, the release of well-tolerated, short course treatments (~12 weeks) able to cure the majority of treated HCV patients revolutionized HCV therapy. However, treatment is extremely costly and puts a significant burden on the Canadian healthcare system. Thus, managing treatment costs and improving treatment engagement in those most in need will be a key challenge. Diagnosis and treatment uptake are currently poor in Canada due to financial, geographical, cultural, and social barriers. The United States, Australia, and Scotland all have National Action Plans to prevent, diagnose, and treat HCV in order to efficiently reduce the burden and costs associated with HCV-related liver disease. The theme of the 4th annual symposium held on Feb 27, 2015, “Strategies to Manage HCV Infection in Canada: Moving towards a National Action Plan,” was aimed at identifying strategies to maximize the impact of highly effective therapies to reduce HCV disease burden and ultimately eliminate HCV in Canada. PMID:27446849

  7. Improvements in disaster planning and directions for nursing management.

    PubMed

    Danna, Denise; Bernard, Marirose; Jones, John; Mathews, Pamela

    2009-10-01

    Since Hurricane Katrina, there have been numerous lessons learned and improvements in disaster planning and nursing management. The subsequent Hurricane Gustav allowed nurses and disaster planners to "test the system" and identify improvements that worked and did not. The authors outline those improvements and give direction for change and further improvements. PMID:19820524

  8. Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-05-08

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Station (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  9. 75 FR 30387 - Improving Market and Planning Efficiency Through Improved Software; Notice of Agenda and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... Federal Energy Regulatory Commission Improving Market and Planning Efficiency Through Improved Software... discuss issues related to power system expansion planning models and software. The technical conference..., Secretary. Agenda for AD10-12 Staff Technical Conference on Planning Models and Software Federal...

  10. On the Relations between Action Planning, Object Identification, and Motor Representations of Observed Actions and Objects

    ERIC Educational Resources Information Center

    Vainio, Lari; Symes, Ed; Ellis, Rob; Tucker, Mike; Ottoboni, Giovanni

    2008-01-01

    Recent evidence suggests that viewing a static prime object (a hand grasp), can activate action representations that affect the subsequent identification of graspable target objects. The present study explored whether stronger effects on target object identification would occur when the prime object (a hand grasp) was made more action-rich and…

  11. Optimizing perioperative decision making: improved information for clinical workflow planning.

    PubMed

    Doebbeling, Bradley N; Burton, Matthew M; Wiebke, Eric A; Miller, Spencer; Baxter, Laurence; Miller, Donald; Alvarez, Jorge; Pekny, Joseph

    2012-01-01

    Perioperative care is complex and involves multiple interconnected subsystems. Delayed starts, prolonged cases and overtime are common. Surgical procedures account for 40-70% of hospital revenues and 30-40% of total costs. Most planning and scheduling in healthcare is done without modern planning tools, which have potential for improving access by assisting in operations planning support. We identified key planning scenarios of interest to perioperative leaders, in order to examine the feasibility of applying combinatorial optimization software solving some of those planning issues in the operative setting. Perioperative leaders desire a broad range of tools for planning and assessing alternate solutions. Our modeled solutions generated feasible solutions that varied as expected, based on resource and policy assumptions and found better utilization of scarce resources. Combinatorial optimization modeling can effectively evaluate alternatives to support key decisions for planning clinical workflow and improving care efficiency and satisfaction. PMID:23304284

  12. Optimizing Perioperative Decision Making: Improved Information for Clinical Workflow Planning

    PubMed Central

    Doebbeling, Bradley N.; Burton, Matthew M.; Wiebke, Eric A.; Miller, Spencer; Baxter, Laurence; Miller, Donald; Alvarez, Jorge; Pekny, Joseph

    2012-01-01

    Perioperative care is complex and involves multiple interconnected subsystems. Delayed starts, prolonged cases and overtime are common. Surgical procedures account for 40–70% of hospital revenues and 30–40% of total costs. Most planning and scheduling in healthcare is done without modern planning tools, which have potential for improving access by assisting in operations planning support. We identified key planning scenarios of interest to perioperative leaders, in order to examine the feasibility of applying combinatorial optimization software solving some of those planning issues in the operative setting. Perioperative leaders desire a broad range of tools for planning and assessing alternate solutions. Our modeled solutions generated feasible solutions that varied as expected, based on resource and policy assumptions and found better utilization of scarce resources. Combinatorial optimization modeling can effectively evaluate alternatives to support key decisions for planning clinical workflow and improving care efficiency and satisfaction. PMID:23304284

  13. Customer satisfaction: key to improved service planning

    SciTech Connect

    McAleer, L.J.; Dukich, T.

    1985-06-13

    This article focuses on the accurate measurement of customer needs and requirements for service-planning purposes. It is based on the assumption that providing maximum service value per dollar paid to the utility is a primary objective of utility managers. Using customer satisfaction and perceived service value as a basis for utility service and market planning offers several key benefits. However, in order to take advantage of these benefits, the process used to measure customer satisfaction must meet a number of criteria. A methodology that meets these requirements is the measurement of perceived value (MPV). This technique was developed by the Melior Group and has been successfully applied to more than 6000 consumers in a variety of service industries, including public utilities. The basics of MPV are described.

  14. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    SciTech Connect

    Pava, Daniel S.

    2015-03-25

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) and integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.

  15. IDENTIFYING HIGH PRIORITY EXPOSURE RESEARCH SUPPORTING THE EPA ASBESTOS ACTION PLAN

    EPA Science Inventory

    The EPA Asbestos Action Plan outlines areas, including two exposure assessment areas, where research is needed to reduce uncertainties in current asbestos risk assessments. Scientists from the National Exposure Research Laboratory (NERL) recently conducted survey and literature ...

  16. Voluntary Race-Conscious Affirmative Action Plans: The Significance of Two Recent Supreme Court Decisions.

    ERIC Educational Resources Information Center

    Fischer, Louis

    1987-01-01

    Presents the United States Supreme Court's decisions in Wygant v. the Jackson Board of Education and in International Association of Firefighters v. City of Cleveland. Explores the decisions' more general applications to voluntary affirmative action plans. (PS)

  17. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    SciTech Connect

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department

  18. 78 FR 54469 - Solicitation of Written Comments on Draft National Action Plan for Adverse Drug Event Prevention

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-04

    ... HUMAN SERVICES Solicitation of Written Comments on Draft National Action Plan for Adverse Drug Event... Action Plan for Adverse Drug Event Prevention. DATES: Comments on the draft National Action Plan for Adverse Drug Event Prevention must be received no later than 5 p.m. on October 4, 2013. This...

  19. Streamlined approach for environmental restoration plan for corrective action unit 416, Mud Pit, Project Shoal Area

    SciTech Connect

    1997-07-01

    This plan addresses the actions necessary for the restoration and closure of the Project Shoal Area (PSA), Surface Corrective Action Unit (CAU) 416, Mud Pit (Corrective Action Site No. 57-09-01), a pit that was used to store effluent produced during drilling of the Post-Shot Borehole PS-1 in 1963. This plan describes the activities that will occur at the site and the steps that will be taken to gather enough data to obtain a notice of completion from the Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented with the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996) and the Industrial Sites Quality Assurance Project Plan (DOE/NV, 1994). The SAFER process is being employed at this CAU where enough information exists about the nature and extent of contamination to propose an appropriate corrective action without completing a Corrective Action Decision Document and Corrective Action Plan. This process combines elements of the Data Quality Objective (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. This has already been completed for the mud pit so it will not be repeated here. The DQOs for the mud pit are presented in the Corrective Action Investigation Plan for Project Shoal Area, CAU No. 416 (DOE/NV, 1996). This observational approach provides a framework for managing uncertainty and planning decision making.

  20. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CMS, designed to reduce improper payments in each program based on its analysis of the error causes in... State must take the following actions: (1) Data analysis. States must conduct data analysis such as... associated with improper payments. (2) Program analysis. States must review the findings of the data...

  1. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CMS, designed to reduce improper payments in each program based on its analysis of the error causes in... State must take the following actions: (1) Data analysis. States must conduct data analysis such as... associated with improper payments. (2) Program analysis. States must review the findings of the data...

  2. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CMS, designed to reduce improper payments in each program based on its analysis of the error causes in... State must take the following actions: (1) Data analysis. States must conduct data analysis such as... associated with improper payments. (2) Program analysis. States must review the findings of the data...

  3. 7 CFR 275.17 - State corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., based on the most recent information available: (1) Specific description and identification of each... appropriate, as defined in § 275.15(c)(3) of this part; (4) Geographic extent of the deficiency (e.g... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action §...

  4. 7 CFR 275.17 - State corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., based on the most recent information available: (1) Specific description and identification of each... appropriate, as defined in § 275.15(c)(3) of this part; (4) Geographic extent of the deficiency (e.g... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action §...

  5. 7 CFR 275.17 - State corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., based on the most recent information available: (1) Specific description and identification of each... appropriate, as defined in § 275.15(c)(3) of this part; (4) Geographic extent of the deficiency (e.g... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action §...

  6. 7 CFR 275.17 - State corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., based on the most recent information available: (1) Specific description and identification of each... appropriate, as defined in § 275.15(c)(3) of this part; (4) Geographic extent of the deficiency (e.g... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action §...

  7. 7 CFR 275.17 - State corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., based on the most recent information available: (1) Specific description and identification of each... appropriate, as defined in § 275.15(c)(3) of this part; (4) Geographic extent of the deficiency (e.g... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action §...

  8. A relativistic O (a{sup 2}) improved action for heavy quarks

    SciTech Connect

    M. B. Oktay et al.

    2004-01-05

    The authors extend the Fermilab formalism for heavy quarks to develop an {Omicron}(a{sup 2}) improved relativistic action. They discuss their construction of the action, including the identification of redundant operators and the calculation of the improvement coefficients.

  9. A national action plan for promoting preconception health and health care in the United States (2012-2014).

    PubMed

    Floyd, R Louise; Johnson, Kay A; Owens, Jasmine R; Verbiest, Sarah; Moore, Cynthia A; Boyle, Coleen

    2013-10-01

    Preconception health and health care (PCHHC) has gained increasing popularity as a key prevention strategy for improving outcomes for women and infants, both domestically and internationally. The Action Plan for the National Initiative on Preconception Health and Health Care: A Report of the PCHHC Steering Committee (2012-2014) provides a model that states, communities, public, and private organizations can use to help guide strategic planning for promoting preconception care projects. Since 2005, a national public-private PCHHC initiative has worked to create and implement recommendations on this topic. Leadership and funding from the Centers for Disease Control and Prevention combined with the commitment of maternal and child health leaders across the country brought together key partners from the public and private sector to provide expertise and technical assistance to develop an updated national action plan for the PCHHC Initiative. Key activities for this process included the identification of goals, objectives, strategies, actions, and anticipated timelines for the five workgroups that were established as part of the original PCHHC Initiative. These are further described in the action plan. To assist other groups doing similar work, this article discusses the approach members of the PCHHC Initiative took to convene local, state, and national leaders to enhance the implementation of preconception care nationally through accomplishments, lessons learned, and projections for future directions. PMID:23944970

  10. Grasping motor impairments in autism: not action planning but movement execution is deficient.

    PubMed

    Stoit, Astrid M B; van Schie, Hein T; Slaats-Willemse, Dorine I E; Buitelaar, Jan K

    2013-12-01

    Different views on the origin of deficits in action chaining in autism spectrum disorders (ASD) have been posited, ranging from functional impairments in action planning to internal models supporting motor control. Thirty-one children and adolescents with ASD and twenty-nine matched controls participated in a two-choice reach-to-grasp paradigm wherein participants received cueing information indicating either the object location or the required manner of grasping. A similar advantage for location cueing over grip cueing was found in both groups. Both accuracy and reaction times of the ASD group were indistinguishable from the control group. In contrast, movement times of the ASD group were significantly delayed in comparison with controls. These findings suggest that movement execution rather than action planning is deficient in ASD, and that deficits in action chaining derive from impairments in internal action models supporting action execution. PMID:23619948

  11. Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No. 0

    SciTech Connect

    Robert F. Boehlecke

    2004-06-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

  12. Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David A. Strand

    2004-06-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

  13. Comprehensive Evaluation and Implementation of Improvement Actions in Butcher Shops.

    PubMed

    Leotta, Gerardo A; Brusa, Victoria; Galli, Lucía; Adriani, Cristian; Linares, Luciano; Etcheverría, Analía; Sanz, Marcelo; Sucari, Adriana; Peral García, Pilar; Signorini, Marcelo

    2016-01-01

    Foodborne pathogens can cause acute and chronic diseases and produce a wide range of symptoms. Since the consumption of ground beef is a risk factor for infections with some bacterial pathogens, we performed a comprehensive evaluation of butcher shops, implemented improvement actions for both butcher shops and consumers, and verified the impact of those actions implemented. A comprehensive evaluation was made and risk was quantified on a 1-100 scale as high-risk (1-40), moderate-risk (41-70) or low-risk (71-100). A total of 172 raw ground beef and 672 environmental samples were collected from 86 butcher shops during the evaluation (2010-2011) and verification (2013) stages of the study. Ground beef samples were analyzed for mesophilic aerobic organisms, Escherichia coli and coagulase-positive Staphylococcus aureus enumeration. Salmonella spp., E. coli O157:H7, non-O157 Shiga toxin-producing E. coli (STEC), and Listeria monocytogenes were detected and isolated from all samples. Risk quantification resulted in 43 (50.0%) high-risk, 34 (39.5%) moderate-risk, and nine (10.5%) low-risk butcher shops. Training sessions for 498 handlers and 4,506 consumers were held. Re-evaluation by risk quantification and microbiological analyses resulted in 19 (22.1%) high-risk, 42 (48.8%) moderate-risk and 25 (29.1%) low-risk butcher shops. The count of indicator microorganisms decreased with respect to the 2010-2011 period. After the implementation of improvement actions, the presence of L. monocytogenes, E. coli O157:H7 and stx genes in ground beef decreased. Salmonella spp. was isolated from 10 (11.6%) ground beef samples, without detecting statistically significant differences between both study periods (evaluation and verification). The percentage of pathogens in environmental samples was reduced in the verification period (Salmonella spp., 1.5%; L. monocytogenes, 10.7%; E. coli O157:H7, 0.6%; non-O157 STEC, 6.8%). Risk quantification was useful to identify those relevant facts

  14. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs.

  15. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons Nevada Test Site, Nevada

    SciTech Connect

    DOE /NV Operations Office

    1999-05-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and criteria for conducting site investigation activities at CAU 232, Area 25 Sewage Lagoons. Corrective Action Unit 232 consists of CAS 25-03-01, Sewage Lagoon, located in Area 25 of the Nevada Test Site (NTS). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Area 25 Sewage Lagoons (Figure 1-2) (IT, 1999b) are located approximately 0.3 mi south of the Test Cell 'C' (TCC) Facility and were used for the discharge of sanitary effluent from the TCC facility. For purposes of this discussion, this site will be referred to as either CAU 232 or the sewage lagoons.

  16. Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks Nevada Test Site, Nevada

    SciTech Connect

    U.S. Department of Energy, Nevada Operations Office

    1999-05-05

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 135, Area 25 Underground Storage Tanks (USTs), which is located on the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada.

  17. Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada

    SciTech Connect

    D. L. Gustafason

    2001-02-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential.

  18. Corrective Action Investigation Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada

    SciTech Connect

    DOE /NV

    1999-01-25

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 240, Area 25 Vehicle Washdown, which is located on the Nevada Test Site (NTS).

  19. 76 FR 11681 - Improving Public Safety Communications in the 800 MHz Band; New 800 MHz Band Plan for Puerto Rico...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ...This document summarizes the Fourth Report and Order, which establishes a new 800 MHz band plan for the U.S. Virgin Islands (USVI). This action is necessary to meet the Commission's goals to improve public safety communications in the 800 MHz band. The effect of this order ensures an orderly and efficient transition to the new 800 MHz band plan in the...

  20. Annual Report on Our Call to Action: Strategic Plan for the Montgomery County Public Schools

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2004

    2004-01-01

    In June 2003 the Board of Education adopted "Our Call to Action, Pursuit of Excellence," the second edition of the school system's strategic plan. This update of the original November 1999 Our Call to Action, while remaining focused on the core mission of providing every student with a high-quality, world-class education, strengthened the…

  1. Do Bans on Affirmative Action Hurt Minority Students? Evidence from the Texas Top 10% Plan

    ERIC Educational Resources Information Center

    Cortes, Kalena E.

    2010-01-01

    In light of the recent bans on affirmative action in higher education, this paper provides new evidence on the effects of alternative admissions policies on the persistence and college completion of minority students. I find that the change from affirmative action to the Top 10% Plan in Texas decreased both retention and graduation rates of…

  2. India's Action Plan for Wildlife Conservation and Role of Voluntary Bodies.

    ERIC Educational Resources Information Center

    Singh, Samar

    1985-01-01

    Describes India's National Action Plan for wildlife conservation, itemizing and explaining the main components and strategies of this action program. Also presents a historical perspective of conservation practices, policies, and programs. A table of India's national parks and sanctuaries with data from 1970 to 1983 is included. (ML)

  3. 78 FR 23740 - Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-22

    ... Register (78 FR 9028-9029, Docket No. APHIS-2010-0086) a notice that made a proposed action plan describing... Animal and Plant Health Inspection Service Notice of Availability of a Swine Brucellosis and Pseudorabies... swine brucellosis and pseudorabies available for public review and comment. This action will...

  4. Background Research and Mapping. Australian School Science Education National Action Plan, 2008-2012. Volume 2

    ERIC Educational Resources Information Center

    Rennie, Leonie J.; Goodrum, Denis

    2007-01-01

    The purpose of this document is to provide background to the text and recommended actions of the Australian School Science Education National Action Plan, 2007-2012. The first part presents a synthesis of the national and international research used to identify gaps and overlaps amongst activities related to school science education in …

  5. Grasping Motor Impairments in Autism: Not Action Planning but Movement Execution Is Deficient

    ERIC Educational Resources Information Center

    Stoit, Astrid M. B.; van Schie, Hein T.; Slaats-Willemse, Dorine I. E.; Buitelaar, Jan K.

    2013-01-01

    Different views on the origin of deficits in action chaining in autism spectrum disorders (ASD) have been posited, ranging from functional impairments in action planning to internal models supporting motor control. Thirty-one children and adolescents with ASD and twenty-nine matched controls participated in a two-choice reach-to-grasp paradigm…

  6. Too much talk and not enough action over obesity plan.

    PubMed

    2016-09-12

    After all the build-up and delays, it was probably no surprise that the government's eagerly-awaited childhood obesity plan has been derided for being too timid. The 13-page document - relatively light considering the severity of the posed threat - fails to mention tighter controls on advertising unhealthy food and drinks to children and families. Without these controls it is hard to see how the plan's stated aim of reducing childhood obesity in England over the next ten years can be met. PMID:27615563

  7. National climate change action plans: Interim report for developing and transition countries

    SciTech Connect

    Benioff, R.; Ness, E.; Hirst, J.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  8. Human Action Recognition Using Improved Salient Dense Trajectories

    PubMed Central

    Li, Qingwu; Cheng, Haisu; Zhou, Yan; Huo, Guanying

    2016-01-01

    Human action recognition in videos is a topic of active research in computer vision. Dense trajectory (DT) features were shown to be efficient for representing videos in state-of-the-art approaches. In this paper, we present a more effective approach of video representation using improved salient dense trajectories: first, detecting the motion salient region and extracting the dense trajectories by tracking interest points in each spatial scale separately and then refining the dense trajectories via the analysis of the motion saliency. Then, we compute several descriptors (i.e., trajectory displacement, HOG, HOF, and MBH) in the spatiotemporal volume aligned with the trajectories. Finally, in order to represent the videos better, we optimize the framework of bag-of-words according to the motion salient intensity distribution and the idea of sparse coefficient reconstruction. Our architecture is trained and evaluated on the four standard video actions datasets of KTH, UCF sports, HMDB51, and UCF50, and the experimental results show that our approach performs competitively comparing with the state-of-the-art results. PMID:27293425

  9. Corrective action investigation plan for Corrective Action Unit 340, Pesticide Release Sites, Nevada Test Site, Nye County, Nevada

    SciTech Connect

    1998-01-01

    This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to the FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.

  10. Voice of the customer: Customer satisfaction measurement results, recommendations and action plans

    SciTech Connect

    Schriber, J.B.; Feniger, E.

    1994-11-01

    Southern California Edison has instituted a new business plan in 1991 for its Customer Solutions Department. One of the goals is to increase customer satisfaction through the measurement and continuous enhancement of value in each major customer segment. One of many tactics employed to implement this strategy was the establishment of a customer satisfaction measurement program and a customer satisfaction implementation program. The measurement of customer satisfaction baselines and development of feedback systems focuses on business lines with a high volume of customer transactions: customer communication centers, local/front offices, field services/meter readers, energy efficiency services and the electric distribution system design function. The customer satisfaction surveys are administered to approximately 10,000 customers annually. Using the results of the customer satisfaction baseline measurements, more than 200 employees formed teams to identify and implement more than 225 action items aimed at improving customer satisfaction. These strategies remain in place for 1994 and beyond.

  11. Excited nucleon spectrum using non-perturbative improved clover action

    SciTech Connect

    D. G. Richards; M. Gockeler; R. Horsley; D. Pleiter; P. E. L. Rakow; G. Schierholz; C. M. Maynard

    2001-07-01

    We discuss the extraction of negative-parity baryon masses from lattice QCD calculations. The mass of the lowest-lying negative-parity J = 1/2- state is computed in quenched lattice QCD using an O(a)-improved clover fermion action, and a splitting found with the nucleon mass. The calculation is performed on two lattice volumes, and three lattice spacings enabling a study of both finite-volume and finite-lattice-spacing uncertainties. A measurement of the first excited radial excitation of the nucleon finds a mass comparable, or even somewhat larger than that of the negative-parity ground state, in accord with other lattice determinations but in disagreement with experiment. Results are also presented for the lightest negative-parity I=3/2 state.

  12. Demystifying Accreditation: Action Plans for a National or Regional Accreditation

    ERIC Educational Resources Information Center

    Wood, Ann L.

    2006-01-01

    As part of educational reform, many institutions of higher education are undergoing accreditation processes. Based on interviews, observations, and the author's experiences in accreditation reviews, this discussion delineates three stages of planning for an accreditation process. Recommendations are organized by each stage of preparation into…

  13. Uranium Mill Tailings Remedial Action Project Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1992-11-01

    The Department of Energy (DOE) has issued requirements for complying with DOLE and other Federal agency environmental regulations. DOE Order 5400.1 requires environmental monitoring plans for each DOE operation that uses, generates, releases, or manages pollutants of radioactive and hazardous materials.

  14. The New Morbidity: A National Plan of Action.

    ERIC Educational Resources Information Center

    Baumeister, Alfred A.; And Others

    1991-01-01

    Discusses child morbidity, suggesting solutions can be found at the community level. Argues the federal government's role is essential in articulating policy and providing resources. Generates a new morbidity model emphasizing poverty and social factors as crucial influences. Lists priorities for effective, preventive, intervention planning. (NL)

  15. Strategic Planning to Improve EHDI Programs

    ERIC Educational Resources Information Center

    White, Karl R.; Blaiser, Kristina M.

    2011-01-01

    Because newborn hearing screening has become the standard of care in the United States, every state has established an early hearing detection and intervention (EHDI) program responsible for establishing, maintaining, and improving the system of services needed to serve children with hearing loss and their families. While significant developments…

  16. Planning School Improvement for Student Career Development.

    ERIC Educational Resources Information Center

    Lotto, Linda S.

    1986-01-01

    Presents recommendations for developing the content of career development activities in secondary schools, including basic academic skills, occupational skills, job-seeking skills, world of work knowledge, and work values. Also presents recommendations to improve the delivery of career development activities in secondary schools and discusses the…

  17. 40 CFR 300.440 - Procedures for planning and implementing off-site response actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Procedures for planning and implementing off-site response actions. 300.440 Section 300.440 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES...

  18. 75 FR 36551 - State Highway-Rail Grade Crossing Action Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ..., including the applicable engineering criteria. As an initial matter, the State action plans are planning... engineering evaluations of the safety issues in the identified States be required. As an initial matter, the... crossings. As an initial matter, this final rule does not prohibit the identified States from...

  19. Combating Violence and Delinquency: The National Juvenile Justice Action Plan. Summary.

    ERIC Educational Resources Information Center

    Coordinating Council on Juvenile Justice and Delinquency Prevention, Washington, DC.

    This summary of the Coordinating Council on Juvenile Justice and Delinquency Prevention's "National Juvenile Justice Action Plan" presents innovative and effective strategies designed to reduce violence and victimization. The plan describes how communities can generate solutions and how individuals and groups can prevent or reduce violence in…

  20. Empowering Parents in the College-Planning Process: An Action-Inquiry Case Study

    ERIC Educational Resources Information Center

    Hallett, Ronald E.; Griffen, Jacalyn

    2015-01-01

    Involving parents in the college-planning process is essential to increasing access for students from low-income communities of color. Using the action inquiry model, we explore how collaboration between a school district and a university can empower parents to engage in meaningful conversations and planning related to college access. This…

  1. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Notice and timing of CMS action on State plan material. 457.160 Section 457.160 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES Introduction; State Plans...

  2. Implementing Governance for a New Era: An Action Plan for Higher Education Trustees

    ERIC Educational Resources Information Center

    American Council of Trustees and Alumni, 2014

    2014-01-01

    "Implementing Governance for a New Era" is an action plan to assist college and university trustees in reforming higher education. Delivered to more than 16,000 college and university trustees in November 2014, the plan provides details on how trustees properly represent the public by ensuring students receive a quality education at a…

  3. International Youth Year: Activities of ECLAC in Fulfillment of the Regional Plan of Action.

    ERIC Educational Resources Information Center

    United Nations Economic and Social Council, New York, NY.

    The report discusses the implementation by the Economic Commission for Latin America and the Caribbean (ECLAC) of the concrete program of measures and activities proposed by the Regional Plan of Action for Latin America and the Caribbean for the International Youth Year. The central objectives of the Plan are to create greater awareness concerning…

  4. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Notice and timing of CMS action on State plan material. 457.160 Section 457.160 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES Introduction; State Plans...

  5. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Notice and timing of CMS action on State plan material. 457.160 Section 457.160 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES Introduction; State Plans...

  6. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Notice and timing of CMS action on State plan material. 457.160 Section 457.160 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES Introduction; State Plans...

  7. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Notice and timing of CMS action on State plan material. 457.160 Section 457.160 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES Introduction; State Plans...

  8. Assessing Changes in Job Behavior Due to Training: A Guide to the Participant Action Plan Approach.

    ERIC Educational Resources Information Center

    Office of Personnel Management, Washington, DC.

    This guide provides a brief introduction to the Participant Action Plan Approach (PAPA) and a user's handbook. Part I outlines five steps of PAPA which determine how job behavior is changed by training course or program participation. Part II, the manual, is arranged by the five steps of the PAPA approach. Planning for PAPA discusses making…

  9. Corrective Action Investigation Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada: Revision 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-05-03

    The general purpose of this Corrective Action Investigation Plan is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective action alternatives (CAAs) for Corrective Action Unit (CAU) 543: Liquid Disposal Units, Nevada Test Site (NTS), Nevada. Located in Areas 6 and 15 on the NTS, CAU 543 is comprised of a total of seven corrective action sites (CASs), one in Area 6 and six in Area 15. The CAS in Area 6 consists of a Decontamination Facility and its components which are associated with decontamination of equipment, vehicles, and materials related to nuclear testing. The six CASs in Area 15 are located at the U.S. Environmental Protection Agency Farm and are related to waste disposal activities at the farm. Sources of possible contamination at Area 6 include potentially contaminated process waste effluent discharged through a process waste system, a sanitary waste stream generated within buildings of the Decon Facility, and radiologically contaminated materials stored within a portion of the facility yard. At Area 15, sources of potential contamination are associated with the dairy operations and the animal tests and experiments involving radionuclide uptake. Identified contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, petroleum hydrocarbons, pesticides, herbicides, polychlorinated biphenyls, metals, and radionuclides. Three corrective action closure alternatives - No Further Action, Close in Place, or Clean Closure - will be recommended for CAU 543 based on an evaluation of all the data quality objective-related data. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of CAAs that will be presented in the Corrective Action Decision Document.

  10. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0

    SciTech Connect

    Wickline, Alfred

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action

  11. Development of a mental health action checklist for improving workplace environment as means of job stress prevention.

    PubMed

    Yoshikawa, Toru; Kawakami, Norito; Kogi, Kazutaka; Tsutsumi, Akizumi; Shimazu, Miyuki; Nagami, Makiko; Shimazu, Akihito

    2007-07-01

    An action checklist for improving the workplace environment by means of enhancing mental health of workers (Mental Health Action Check List: MHACL) was developed. The use of the checklist for primary prevention was examined. MHACL was developed through three steps: (1) Review of related references and collection of improvement examples for designing a draft MHACL; (2) pilot application of the draft at industrial workplaces and trials at workshops of occupational health staff; and (3) proposing a new MHACL for general use in industry. Workplace improvement actions related to mental health were listed in eight technical areas. From 84 workplaces in Japan, 201 such actions were collected. Typical improvement action phrases were extracted based on these examples, and a draft MHACL containing 40 generally applicable actions were prepared. This draft was applied to selected workplaces for its use as a tool for group discussion. Then, the utility of the checklist was discussed by 105 occupational health staff working in public service offices. The workshop suggested modifications of the draft MHACL including improved check items and usage procedures and the need to use easy-to-understand actions. The final version of the MHACL comprised 30 items in six technical areas: A) sharing work planning, B) work time and organization, C) ergonomic work methods, D) workplace environment, E) mutual support in the workplace, and F) preparedness and care. A new action checklist was proposed for use as a means of changing existing workplace environments and proposing practical actions for improving it. The checklist was confirmed to be useful for organizing workplace-level discussion for identifying immediate improvements at the workplace. The checklist is expected to be widely applied for promoting primary prevention measures in terms of better mental health. PMID:17721060

  12. Evaluating School Improvement Plans and Their Affect on Academic Performance

    ERIC Educational Resources Information Center

    Fernandez, Kenneth E.

    2011-01-01

    The development of a school improvement plan (SIP) has become an integral part of many school reform efforts. However, there are almost no studies that empirically examine the effectiveness of SIPs. The few studies examining the planning activities of organizations have generally focused on the private sector and have not provided clear or…

  13. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    SciTech Connect

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  14. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2006-09-01

    Corrective Action Unit (CAU) 543, Liquid Disposal Units, is listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. CAU 543 consists of seven Corrective Action Sites (CASs) located in Areas 6 and 15 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven CASs: {sm_bullet} CAS 06-07-01, Decon Pad {sm_bullet} CAS 15-01-03, Aboveground Storage Tank {sm_bullet} CAS 15-04-01, Septic Tank {sm_bullet} CAS 15-05-01, Leachfield {sm_bullet} CAS 15-08-01, Liquid Manure Tank {sm_bullet} CAS 15-23-01, Underground Radioactive Material Area {sm_bullet} CAS 15-23-03, Contaminated Sump, Piping From January 24, 2005 through April 14, 2005, CAU 543 site characterization activities were conducted, and are reported in Appendix A of the CAU 543 Corrective Action Decision Document (CADD) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2005). The recommended corrective action as stated in the approved CADD is No Further Action for five of the CAU 543 CASs, and Closure In Place for the remaining two CASs.

  15. Improvement plans for DECADE Module 1

    SciTech Connect

    Kortbawi, D.; Goyer, J.; Thompson, J.; Commisso, B.; Weber, B.; Ottinger, P.

    1996-12-31

    DECADE Module 1 (DM1) is a prototype module for the DECADE nuclear weapons effects simulator. It uses a Plasma Opening Switch (POS) with an inductive energy storage for the final stage of pulse compression. Current research is intended to improve operation of the prototype from the present level of 11 to 12 kRad(Si), projected to a 16 module DECADE system, to 20 kRad(Si). The primary limitation is losses in the switch/load system reducing the energy being delivered to the bremsstrahlung diode load. there are also secondary concerns with the reproducibility of the system which are important given the modular nature of DECADE. Preliminary results indicate significant time delays between the rise of POS impedance to the onset of production of X-rays from the load. the rise of voltage and current measured directly at the load is coincident with the rise of the X-ray pulse. there are also losses and delayed propagation of current through the MITL between the switch and the load. The data also indicate asymmetries in the current being delivered downstream of the POS. The modifications being considered to improve operation will depend on the results of the experiments with the expanded diagnostic set. Some of the options being considered include: tailoring of the geometric impedances between the switch and the load, optimizing of the load impedance, transparent electrodes to allow removal of plasma in the region downstream of the POS, providing bias currents to improve vacuum transport of the launched flow, improved uniformity of the injected switch plasma, and better conditioning/cleaning of the vacuum system.

  16. Improved genetic algorithm for fast path planning of USV

    NASA Astrophysics Data System (ADS)

    Cao, Lu

    2015-12-01

    Due to the complex constraints, more uncertain factors and critical real-time demand of path planning for USV(Unmanned Surface Vehicle), an approach of fast path planning based on voronoi diagram and improved Genetic Algorithm is proposed, which makes use of the principle of hierarchical path planning. First the voronoi diagram is utilized to generate the initial paths and then the optimal path is searched by using the improved Genetic Algorithm, which use multiprocessors parallel computing techniques to improve the traditional genetic algorithm. Simulation results verify that the optimal time is greatly reduced and path planning based on voronoi diagram and the improved Genetic Algorithm is more favorable in the real-time operation.

  17. 124. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: RAMP DETAILS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    124. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: RAMP DETAILS Sheet 6 of 11 (#3278) - Huntington Beach Municipal Pier, Pacific Coast Highway at Main Street, Huntington Beach, Orange County, CA

  18. 120. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: LAYOUT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    120. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: LAYOUT OF EXISTING PIER Sheet 2 of 11 (#3274) - Huntington Beach Municipal Pier, Pacific Coast Highway at Main Street, Huntington Beach, Orange County, CA

  19. 126. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: EXTENSION DETAILS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    126. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: EXTENSION DETAILS Sheet 7 of 11 (#3280) - Huntington Beach Municipal Pier, Pacific Coast Highway at Main Street, Huntington Beach, Orange County, CA

  20. 127. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: FRAMING DETAILS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    127. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: FRAMING DETAILS Sheet 8 of 11 (#3281) - Huntington Beach Municipal Pier, Pacific Coast Highway at Main Street, Huntington Beach, Orange County, CA

  1. 121. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: LAYOUT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    121. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: LAYOUT OF EXISTING PIER Sheet 3 of 11 (#3275) - Huntington Beach Municipal Pier, Pacific Coast Highway at Main Street, Huntington Beach, Orange County, CA

  2. 122. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: LAYOUT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    122. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: LAYOUT OF EXTENSION TO PIER Sheet 4 of 11 (#3276) - Huntington Beach Municipal Pier, Pacific Coast Highway at Main Street, Huntington Beach, Orange County, CA

  3. 125. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: MODIFIED RAMP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    125. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: MODIFIED RAMP DETAILS Sheet 6A of 11 (#3279) - Huntington Beach Municipal Pier, Pacific Coast Highway at Main Street, Huntington Beach, Orange County, CA

  4. 128. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: BOAT LANDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    128. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: BOAT LANDING DETAILS Sheet 9 of 11 (#3282) - Huntington Beach Municipal Pier, Pacific Coast Highway at Main Street, Huntington Beach, Orange County, CA

  5. 123. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: REPAIR DETAILS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    123. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: REPAIR DETAILS Sheet 5 of 11 (#3277) - Huntington Beach Municipal Pier, Pacific Coast Highway at Main Street, Huntington Beach, Orange County, CA

  6. A Trainer's Guide to Successful Productivity Improvement Planning.

    ERIC Educational Resources Information Center

    Smith, Judson

    1982-01-01

    Discusses the concept of productivity improvement which must be studied before selecting an approach. Concepts include increasing efficiency without decreasing quality; using employees to redefine the job; and planning for long-term effort. (JOW)

  7. Improving patient-centered care through advance care planning.

    PubMed

    Motley, Molly

    2013-06-01

    Advance care planning is crucial for patients confronting incurable, debilitating, or terminal disease. Discussing end-of-life issues can reduce overtreatment and undertreatment as defined by the patient, and improve satisfaction with care. PMID:23805592

  8. 130. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: LIGHTING DETAILS. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    130. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: LIGHTING DETAILS. Sheet 11 of 11 (#3284) - Huntington Beach Municipal Pier, Pacific Coast Highway at Main Street, Huntington Beach, Orange County, CA

  9. 129. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: LIGHTING DIAGRAM. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    129. PLAN OF IMPROVEMENT, HUNTINGTON BEACH MUNICIPAL PIER: LIGHTING DIAGRAM. Sheet lO of 11 (#3283) - Huntington Beach Municipal Pier, Pacific Coast Highway at Main Street, Huntington Beach, Orange County, CA

  10. Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan

    SciTech Connect

    Not Available

    1994-07-01

    The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases.

  11. Group action planning as a support strategy for Hispanic families: parent and professional perspectives.

    PubMed

    Blue-Banning, M J; Turnbull, A P; Pereira, L

    2000-06-01

    Focus group interviews were conducted to obtain participants' preliminary reactions to the responsiveness of group action planning, a person-centered planning approach, as a support strategy for Hispanic families of individuals with disabilities. Focus group participants were 38 Hispanic parents of youth/young adults with developmental disabilities and 22 professionals who provided support services to Hispanic youth/young adults with developmental disabilities and their families. Both constituency groups identified advantages and disadvantages of group action planning. We focus our key recommendations on the implications of this information for education and human service systems as well as directions for future research. PMID:10900934

  12. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    SciTech Connect

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  13. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  14. Interaction in planning movement direction for articulatory gestures and manual actions.

    PubMed

    Vainio, Lari; Tiainen, Mikko; Tiippana, Kaisa; Komeilipoor, Naeem; Vainio, Martti

    2015-10-01

    Some theories concerning speech mechanisms assume that overlapping representations are involved in programming certain articulatory gestures and hand actions. The present study investigated whether planning of movement direction for articulatory gestures and manual actions could interact. The participants were presented with written vowels (Experiment 1) or syllables (Experiment 2) that were associated with forward or backward movement of tongue (e.g., [i] vs. [ɑ] or [te] vs. [ke], respectively). They were required to pronounce the speech unit and simultaneously move the joystick forward or backward according to the color of the stimulus. Manual and vocal responses were performed relatively rapidly when the articulation and the hand action required movement into the same direction. The study suggests that planning horizontal tongue movements for articulation shares overlapping neural mechanisms with planning horizontal movement direction of hand actions. PMID:26126804

  15. Improved treatment planning for COMS eye plaques

    SciTech Connect

    Astrahan, Melvin A. . E-mail: astrahan@usc.edu

    2005-03-15

    Purpose: A recent reanalysis of the Collaborative Ocular Melanoma Study (COMS) medium tumor trial concluded that incorporating factors to account for anisotropy, line source approximation, the gold plaque, and attenuation in the Silastic seed carrier into the dose calculations resulted in a significant and consistent reduction of calculated doses to structures of interest within the eye. The authors concluded that future eye plaque dosimetry should be 'performed using the most up-to-date parameters available.' The reason these factors are important is attributable to the low energy {sup 125}I radiation (approximately 28 keV) that is primarily absorbed by the photoelectric process. Photoelectric absorption is quite dependent on the atomic composition of the absorbing material. Being 40% silicon by weight, the effective atomic number of Silastic is significantly greater than that of water. Although the AAPM TG43 brachytherapy formalism inherently addresses the issues of source anisotropy and geometry, its parameter that accounts for scatter and attenuation, the radial dose function g(r), assumes that the source is immersed in infinite homogeneous water. In this work, factors are proposed for {sup 125}I that correct for attenuation in the Silastic carrier and scatter deficits resulting from the gold plaque and nearby air. The implications of using {sup 103}Pd seeds in COMS plaques are also discussed. Methods and materials: An existing TG43-based ophthalmic plaque planning system was modified to incorporate additional scatter and attenuation correction factors that better account for the path length of primary radiation in the Silastic seed carrier and the distance between the dose calculation point and the eye-air interface. Results: Compared with homogeneous water, the dose-modifying effects of the Silastic and gold are greatest near the plaque surface and immediately adjacent to the plaque, while being least near the center of the eye. The calculated dose

  16. Action Analytics: Measuring and Improving Performance that Matters in Higher Education

    ERIC Educational Resources Information Center

    Norris, Donald; Baer, Linda; Leonard, Joan; Pugliese, Louis; Lefrere, Paul

    2008-01-01

    The action analytics of the future will better assess students' competencies. Using individualized planning, advising, and best practices from cradle to career, these action analytics solutions will align interventions to facilitate retention and transitions and will fully maximize learners' success. Six primary actions are needed to evolve from…

  17. Action Research to Improve the Learning Space for Diagnostic Techniques.

    PubMed

    Ariel, Ellen; Owens, Leigh

    2015-12-01

    The module described and evaluated here was created in response to perceived learning difficulties in diagnostic test design and interpretation for students in third-year Clinical Microbiology. Previously, the activities in lectures and laboratory classes in the module fell into the lower cognitive operations of "knowledge" and "understanding." The new approach was to exchange part of the traditional activities with elements of interactive learning, where students had the opportunity to engage in deep learning using a variety of learning styles. The effectiveness of the new curriculum was assessed by means of on-course student assessment throughout the module, a final exam, an anonymous questionnaire on student evaluation of the different activities and a focus group of volunteers. Although the new curriculum enabled a major part of the student cohort to achieve higher pass grades (p < 0.001), it did not meet the requirements of the weaker students, and the proportion of the students failing the module remained at 34%. The action research applied here provided a number of valuable suggestions from students on how to improve future curricula from their perspective. Most importantly, an interactive online program that facilitated flexibility in the learning space for the different reagents and their interaction in diagnostic tests was proposed. The methods applied to improve and assess a curriculum refresh by involving students as partners in the process, as well as the outcomes, are discussed. Journal of Microbiology & Biology Education. PMID:26753024

  18. Action Research to Improve the Learning Space for Diagnostic Techniques†

    PubMed Central

    Ariel, Ellen; Owens, Leigh

    2015-01-01

    The module described and evaluated here was created in response to perceived learning difficulties in diagnostic test design and interpretation for students in third-year Clinical Microbiology. Previously, the activities in lectures and laboratory classes in the module fell into the lower cognitive operations of “knowledge” and “understanding.” The new approach was to exchange part of the traditional activities with elements of interactive learning, where students had the opportunity to engage in deep learning using a variety of learning styles. The effectiveness of the new curriculum was assessed by means of on-course student assessment throughout the module, a final exam, an anonymous questionnaire on student evaluation of the different activities and a focus group of volunteers. Although the new curriculum enabled a major part of the student cohort to achieve higher pass grades (p < 0.001), it did not meet the requirements of the weaker students, and the proportion of the students failing the module remained at 34%. The action research applied here provided a number of valuable suggestions from students on how to improve future curricula from their perspective. Most importantly, an interactive online program that facilitated flexibility in the learning space for the different reagents and their interaction in diagnostic tests was proposed. The methods applied to improve and assess a curriculum refresh by involving students as partners in the process, as well as the outcomes, are discussed. Journal of Microbiology & Biology Education PMID:26753024

  19. Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada

    SciTech Connect

    K. B. Campbell

    2002-04-01

    Corrective Action Unit (CAU) 490, Station 44 Burn Area is located on the Tonopah Test Range (TTR). CAU 490 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and includes for Corrective Action Sites (CASs): (1) Fire Training Area (CAS 03-56-001-03BA); (2) Station 44 Burn Area (CAS RG-56-001-RGBA); (3) Sandia Service Yard (CAS 03-58-001-03FN); and (4) Gun Propellant Burn Area (CAS 09-54-001-09L2).

  20. Implementation of UMTRA Project Environmental Audit Action Plan status report for period ending September 30, 1992

    SciTech Connect

    Not Available

    1992-09-01

    This report provides the status of implementation of corrective actions for findings made in an Environmental Audit conducted by DOE Headquarters, Office of Environmental Audit, in June 1991. An Action Plan, dated December 1991, was developed to address the findings. The Action Plan was approved by DOE Headquarters, Office of Environment, Safety and Health, in July 1992. This report provides status for each activity listed in the approved Action Plan. Of 48 findings identified in the August 1991 Environmental Audit Report, 4 required no action, 5 were combined with others and actions to correct 19 are complete. Although it appears no progress has been made since the last status report was issued, UMTRA has completed 89% of the findings identified, compared to 72% identified in the last status report. The table below lists the 20 findings where actions are still underway, the current projected completion date, the organization(s) responsible for taking action on the finding, and the UMTRA Project Off ice staff member assigned responsibility for the finding.