Science.gov

Sample records for action plan rap

  1. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  2. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  3. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  4. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  5. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  6. Partnering for environmental restoration: The Port Hope Harbour Remedial Action Plan (RAP)

    SciTech Connect

    Weston, S.M.C.

    1995-12-31

    A Remedial Action Plan (RAP) is being developed for Port Hope Harbour, one of 43 Areas of Concern (AOCs) identified by the International Joint Commission (IJC). The RAP, when implemented, will lead to the restoration and protection of desirable water conditions in Port Hope Harbour. The environmental concern associated with the harbor can be best viewed as a historical contaminated sediment problem. Approximately 90,000 m{sup 3} of sediment located in Port Hope Harbour`s turning basin and west slip are contaminated by uranium and thorium series radionuclides, heavy metals, and PCBs. There are several groups contributing to the development of the RAP. All of these groups have the common goal of developing an environmentally sound plan that reflects the views of the community. Strategic partnerships have been established that recognize the need to integrate and coordinate the efforts of all agencies, stakeholders, and the community. The objective is to develop an environmentally sound remediation plan through an efficient and effective management framework.

  7. 40 CFR 270.160 - When does my RAP become effective?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false When does my RAP become effective? 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.160 When does my RAP become effective? Your RAP becomes effective 30...

  8. 40 CFR 270.95 - How do I apply for a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false How do I apply for a RAP? 270.95... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.95 How do I apply for a RAP? To apply for a RAP, you must complete an...

  9. 40 CFR 270.120 - To whom must I submit my RAP application?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false To whom must I submit my RAP... Action Plans (RAPs) Applying for A Rap § 270.120 To whom must I submit my RAP application? You must submit your application for a RAP to the Director for approval....

  10. 40 CFR 270.95 - How do I apply for a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false How do I apply for a RAP? 270.95... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.95 How do I apply for a RAP? To apply for a RAP, you must complete an...

  11. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under §...

  12. 40 CFR 270.120 - To whom must I submit my RAP application?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false To whom must I submit my RAP... Action Plans (RAPs) Applying for A Rap § 270.120 To whom must I submit my RAP application? You must submit your application for a RAP to the Director for approval....

  13. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for a RAP? 270.110 Section 270.110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Applying for A Rap § 270.110 What must I include in my application for a RAP? You must include the following information in your application for a RAP: (a) The name, address,...

  14. 40 CFR 270.95 - How do I apply for a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false How do I apply for a RAP? 270.95... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.95 How do I apply for a RAP? To apply for a RAP, you must complete an...

  15. 40 CFR 270.210 - What records must I maintain concerning my RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... concerning my RAP? 270.210 Section 270.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.210 What records must I maintain concerning my RAP? You are required to keep records of: (a) All data used to complete RAP applications and...

  16. 40 CFR 270.160 - When does my RAP become effective?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false When does my RAP become effective? 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.160 When does my RAP become effective? Your RAP becomes effective 30...

  17. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under §...

  18. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for a RAP? 270.110 Section 270.110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Applying for A Rap § 270.110 What must I include in my application for a RAP? You must include the following information in your application for a RAP: (a) The name, address,...

  19. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under §...

  20. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under §...

  1. 40 CFR 270.95 - How do I apply for a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false How do I apply for a RAP? 270.95... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.95 How do I apply for a RAP? To apply for a RAP, you must complete an...

  2. 40 CFR 270.160 - When does my RAP become effective?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false When does my RAP become effective? 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.160 When does my RAP become effective? Your RAP becomes effective 30...

  3. 40 CFR 270.210 - What records must I maintain concerning my RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... concerning my RAP? 270.210 Section 270.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.210 What records must I maintain concerning my RAP? You are required to keep records of: (a) All data used to complete RAP applications and...

  4. 40 CFR 270.95 - How do I apply for a RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false How do I apply for a RAP? 270.95... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.95 How do I apply for a RAP? To apply for a RAP, you must complete an...

  5. 40 CFR 270.210 - What records must I maintain concerning my RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... concerning my RAP? 270.210 Section 270.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.210 What records must I maintain concerning my RAP? You are required to keep records of: (a) All data used to complete RAP applications and...

  6. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under §...

  7. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for a RAP? 270.110 Section 270.110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Applying for A Rap § 270.110 What must I include in my application for a RAP? You must include the following information in your application for a RAP: (a) The name, address,...

  8. 40 CFR 270.120 - To whom must I submit my RAP application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false To whom must I submit my RAP... Action Plans (RAPs) Applying for A Rap § 270.120 To whom must I submit my RAP application? You must submit your application for a RAP to the Director for approval....

  9. 40 CFR 270.160 - When does my RAP become effective?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false When does my RAP become effective? 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.160 When does my RAP become effective? Your RAP becomes effective 30...

  10. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for a RAP? 270.110 Section 270.110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Applying for A Rap § 270.110 What must I include in my application for a RAP? You must include the following information in your application for a RAP: (a) The name, address,...

  11. 40 CFR 270.120 - To whom must I submit my RAP application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false To whom must I submit my RAP... Action Plans (RAPs) Applying for A Rap § 270.120 To whom must I submit my RAP application? You must submit your application for a RAP to the Director for approval....

  12. 40 CFR 270.210 - What records must I maintain concerning my RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... concerning my RAP? 270.210 Section 270.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.210 What records must I maintain concerning my RAP? You are required to keep records of: (a) All data used to complete RAP applications and...

  13. 40 CFR 270.210 - What records must I maintain concerning my RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... concerning my RAP? 270.210 Section 270.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.210 What records must I maintain concerning my RAP? You are required to keep records of: (a) All data used to complete RAP applications and...

  14. 40 CFR 270.160 - When does my RAP become effective?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false When does my RAP become effective? 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.160 When does my RAP become effective? Your RAP becomes effective 30...

  15. 40 CFR 270.120 - To whom must I submit my RAP application?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false To whom must I submit my RAP... Action Plans (RAPs) Applying for A Rap § 270.120 To whom must I submit my RAP application? You must submit your application for a RAP to the Director for approval....

  16. 40 CFR 270.195 - When will my RAP expire?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false When will my RAP expire? 270.195... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.195 When will my RAP...

  17. 40 CFR 270.100 - Who must obtain a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Who must obtain a RAP? 270.100 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.100 Who must obtain a RAP? When a facility or remediation waste management site...

  18. 40 CFR 270.80 - What is a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false What is a RAP? 270.80 Section 270.80... ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.80 What is a RAP? (a) A RAP is a special form of RCRA permit that you, as an owner...

  19. 40 CFR 270.100 - Who must obtain a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Who must obtain a RAP? 270.100 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.100 Who must obtain a RAP? When a facility or remediation waste management site...

  20. 40 CFR 270.80 - What is a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false What is a RAP? 270.80 Section 270.80... ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.80 What is a RAP? (a) A RAP is a special form of RCRA permit that you, as an owner...

  1. 40 CFR 270.80 - What is a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false What is a RAP? 270.80 Section 270.80... ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.80 What is a RAP? (a) A RAP is a special form of RCRA permit that you, as an owner...

  2. 40 CFR 270.100 - Who must obtain a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Who must obtain a RAP? 270.100 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.100 Who must obtain a RAP? When a facility or remediation waste management site...

  3. 40 CFR 270.195 - When will my RAP expire?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false When will my RAP expire? 270.195... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.195 When will my RAP...

  4. 40 CFR 270.195 - When will my RAP expire?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false When will my RAP expire? 270.195... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.195 When will my RAP...

  5. 40 CFR 270.80 - What is a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false What is a RAP? 270.80 Section 270.80... ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.80 What is a RAP? (a) A RAP is a special form of RCRA permit that you, as an owner...

  6. 40 CFR 270.195 - When will my RAP expire?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false When will my RAP expire? 270.195... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.195 When will my RAP...

  7. 40 CFR 270.195 - When will my RAP expire?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false When will my RAP expire? 270.195... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.195 When will my RAP...

  8. 40 CFR 270.100 - Who must obtain a RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Who must obtain a RAP? 270.100 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.100 Who must obtain a RAP? When a facility or remediation waste management site...

  9. 40 CFR 270.100 - Who must obtain a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Who must obtain a RAP? 270.100 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.100 Who must obtain a RAP? When a facility or remediation waste management site...

  10. 40 CFR 270.105 - Who must sign the application and any required reports for a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... required reports for a RAP? 270.105 Section 270.105 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.105 Who must sign the application and any required reports for a RAP? Both the owner and the operator must sign the RAP application and any...

  11. 40 CFR 270.125 - If I submit my RAP application as part of another document, what must I do?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false If I submit my RAP application as part... PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.125 If I submit my RAP application as part of another document, what must I do? If you submit your application for a RAP as a part...

  12. 40 CFR 270.105 - Who must sign the application and any required reports for a RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... required reports for a RAP? 270.105 Section 270.105 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.105 Who must sign the application and any required reports for a RAP? Both the owner and the operator must sign the RAP application and any...

  13. 40 CFR 270.125 - If I submit my RAP application as part of another document, what must I do?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false If I submit my RAP application as part... PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.125 If I submit my RAP application as part of another document, what must I do? If you submit your application for a RAP as a part...

  14. 40 CFR 270.105 - Who must sign the application and any required reports for a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... required reports for a RAP? 270.105 Section 270.105 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.105 Who must sign the application and any required reports for a RAP? Both the owner and the operator must sign the RAP application and any...

  15. 40 CFR 270.105 - Who must sign the application and any required reports for a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... required reports for a RAP? 270.105 Section 270.105 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.105 Who must sign the application and any required reports for a RAP? Both the owner and the operator must sign the RAP application and any...

  16. 40 CFR 270.105 - Who must sign the application and any required reports for a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... required reports for a RAP? 270.105 Section 270.105 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.105 Who must sign the application and any required reports for a RAP? Both the owner and the operator must sign the RAP application and any...

  17. 40 CFR 270.125 - If I submit my RAP application as part of another document, what must I do?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false If I submit my RAP application as part... PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.125 If I submit my RAP application as part of another document, what must I do? If you submit your application for a RAP as a part...

  18. 40 CFR 270.125 - If I submit my RAP application as part of another document, what must I do?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false If I submit my RAP application as part... PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.125 If I submit my RAP application as part of another document, what must I do? If you submit your application for a RAP as a part...

  19. 40 CFR 270.125 - If I submit my RAP application as part of another document, what must I do?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false If I submit my RAP application as part... PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.125 If I submit my RAP application as part of another document, what must I do? If you submit your application for a RAP as a part...

  20. 40 CFR 270.185 - For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... choose to terminate my final RAP, or deny my renewal application? 270.185 Section 270.185 Protection of... PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified... final RAP, or deny my renewal application? The Director may terminate your final RAP on his...

  1. 40 CFR 270.185 - For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... choose to terminate my final RAP, or deny my renewal application? 270.185 Section 270.185 Protection of... PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified... final RAP, or deny my renewal application? The Director may terminate your final RAP on his...

  2. 40 CFR 270.185 - For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... choose to terminate my final RAP, or deny my renewal application? 270.185 Section 270.185 Protection of... PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified... final RAP, or deny my renewal application? The Director may terminate your final RAP on his...

  3. 40 CFR 270.185 - For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... choose to terminate my final RAP, or deny my renewal application? 270.185 Section 270.185 Protection of... PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified... final RAP, or deny my renewal application? The Director may terminate your final RAP on his...

  4. 40 CFR 270.185 - For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... choose to terminate my final RAP, or deny my renewal application? 270.185 Section 270.185 Protection of... PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified... final RAP, or deny my renewal application? The Director may terminate your final RAP on his...

  5. Hazardous Waste Remedial Actions Program: Remedial Actions Planning Program Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1989-04-01

    The purpose of this Plan is to describe the quality assurance (QA) requirements for the RAP Program by identifying the quality elements to be controlled and specifying how they will be controlled. The activities for which control elements will be identified include those relating to: preparation, review, and approval of plans, reports, and studies; execution of field and analytical work by subcontractors and other agents; control of subcontractors and other agents during other phases of work; and actions internal to the RAP Program to ensure proper execution of projects.

  6. 40 CFR 270.165 - When may I begin physical construction of new units permitted under the RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of new units permitted under the RAP? 270.165 Section 270.165 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.165 When may I begin physical construction of new units permitted under the RAP? You must not begin physical construction of new...

  7. 40 CFR 270.130 - What is the process for approving or denying my application for a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... denying my application for a RAP? 270.130 Section 270.130 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.130 What is the process for approving or denying my application for a RAP? (a) If the Director tentatively finds that your...

  8. 40 CFR 270.155 - May the decision to approve or deny my RAP application be administratively appealed?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... RAP application be administratively appealed? 270.155 Section 270.155 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.155 May the decision to approve or deny my RAP application be administratively appealed? (a) Any commenter on the...

  9. 40 CFR 270.175 - For what reasons may the Director choose to modify my final RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... choose to modify my final RAP? 270.175 Section 270.175 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.175 For what reasons may the Director choose to modify my final RAP? (a) The Director may...

  10. 40 CFR 270.170 - After my RAP is issued, how may it be modified, revoked and reissued, or terminated?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false After my RAP is issued, how may it be... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.170 After my RAP is issued, how may it be modified, revoked and reissued,...

  11. 40 CFR 270.170 - After my RAP is issued, how may it be modified, revoked and reissued, or terminated?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false After my RAP is issued, how may it be... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.170 After my RAP is issued, how may it be modified, revoked and reissued,...

  12. 40 CFR 270.150 - How will the Director make a final decision on my RAP application?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... decision on my RAP application? 270.150 Section 270.150 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.150 How will the Director make a final decision on my RAP application? (a) The Director must consider and respond to any significant...

  13. 40 CFR 270.225 - What must the State or EPA Region report about noncompliance with RAPs?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... report about noncompliance with RAPs? 270.225 Section 270.225 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.225 What must the State or EPA Region report about noncompliance with RAPs? The State or EPA Region must report noncompliance with...

  14. 40 CFR 270.130 - What is the process for approving or denying my application for a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... denying my application for a RAP? 270.130 Section 270.130 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.130 What is the process for approving or denying my application for a RAP? (a) If the Director tentatively finds that your...

  15. 40 CFR 270.215 - How are time periods in the requirements in this subpart and my RAP computed?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements in this subpart and my RAP computed? 270.215 Section 270.215 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.215 How are time periods in the requirements in this subpart and my RAP computed? (a) Any time period scheduled to begin...

  16. 40 CFR 270.175 - For what reasons may the Director choose to modify my final RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... choose to modify my final RAP? 270.175 Section 270.175 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.175 For what reasons may the Director choose to modify my final RAP? (a) The Director may...

  17. 40 CFR 270.90 - Does my RAP grant me any rights or relieve me of any obligations?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Does my RAP grant me any rights or... PROGRAM Remedial Action Plans (RAPs) General Information § 270.90 Does my RAP grant me any rights or relieve me of any obligations? The provisions of § 270.4 apply to RAPs. (Note: The provisions of §...

  18. 40 CFR 270.170 - After my RAP is issued, how may it be modified, revoked and reissued, or terminated?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false After my RAP is issued, how may it be... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.170 After my RAP is issued, how may it be modified, revoked and reissued,...

  19. 40 CFR 270.215 - How are time periods in the requirements in this subpart and my RAP computed?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements in this subpart and my RAP computed? 270.215 Section 270.215 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.215 How are time periods in the requirements in this subpart and my RAP computed? (a) Any time period scheduled to begin...

  20. 40 CFR 270.90 - Does my RAP grant me any rights or relieve me of any obligations?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Does my RAP grant me any rights or... PROGRAM Remedial Action Plans (RAPs) General Information § 270.90 Does my RAP grant me any rights or relieve me of any obligations? The provisions of § 270.4 apply to RAPs. (Note: The provisions of §...

  1. 40 CFR 270.225 - What must the State or EPA Region report about noncompliance with RAPs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... report about noncompliance with RAPs? 270.225 Section 270.225 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.225 What must the State or EPA Region report about noncompliance with RAPs? The State or EPA Region must report noncompliance with...

  2. 40 CFR 270.150 - How will the Director make a final decision on my RAP application?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... decision on my RAP application? 270.150 Section 270.150 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.150 How will the Director make a final decision on my RAP application? (a) The Director must consider and respond to any significant...

  3. 40 CFR 270.165 - When may I begin physical construction of new units permitted under the RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of new units permitted under the RAP? 270.165 Section 270.165 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.165 When may I begin physical construction of new units permitted under the RAP? You must not begin physical construction of new...

  4. 40 CFR 270.175 - For what reasons may the Director choose to modify my final RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... choose to modify my final RAP? 270.175 Section 270.175 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.175 For what reasons may the Director choose to modify my final RAP? (a) The Director may...

  5. 40 CFR 270.215 - How are time periods in the requirements in this subpart and my RAP computed?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements in this subpart and my RAP computed? 270.215 Section 270.215 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.215 How are time periods in the requirements in this subpart and my RAP computed? (a) Any time period scheduled to begin...

  6. 40 CFR 270.225 - What must the State or EPA Region report about noncompliance with RAPs?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... report about noncompliance with RAPs? 270.225 Section 270.225 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.225 What must the State or EPA Region report about noncompliance with RAPs? The State or EPA Region must report noncompliance with...

  7. 40 CFR 270.225 - What must the State or EPA Region report about noncompliance with RAPs?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... report about noncompliance with RAPs? 270.225 Section 270.225 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.225 What must the State or EPA Region report about noncompliance with RAPs? The State or EPA Region must report noncompliance with...

  8. 40 CFR 270.155 - May the decision to approve or deny my RAP application be administratively appealed?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RAP application be administratively appealed? 270.155 Section 270.155 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.155 May the decision to approve or deny my RAP application be administratively appealed? (a) Any commenter on the...

  9. 40 CFR 270.165 - When may I begin physical construction of new units permitted under the RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of new units permitted under the RAP? 270.165 Section 270.165 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.165 When may I begin physical construction of new units permitted under the RAP? You must not begin physical construction of new...

  10. 40 CFR 270.150 - How will the Director make a final decision on my RAP application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... decision on my RAP application? 270.150 Section 270.150 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.150 How will the Director make a final decision on my RAP application? (a) The Director must consider and respond to any significant...

  11. 40 CFR 270.150 - How will the Director make a final decision on my RAP application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... decision on my RAP application? 270.150 Section 270.150 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.150 How will the Director make a final decision on my RAP application? (a) The Director must consider and respond to any significant...

  12. 40 CFR 270.170 - After my RAP is issued, how may it be modified, revoked and reissued, or terminated?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false After my RAP is issued, how may it be... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.170 After my RAP is issued, how may it be modified, revoked and reissued,...

  13. 40 CFR 270.130 - What is the process for approving or denying my application for a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... denying my application for a RAP? 270.130 Section 270.130 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.130 What is the process for approving or denying my application for a RAP? (a) If the Director tentatively finds that your...

  14. 40 CFR 270.150 - How will the Director make a final decision on my RAP application?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... decision on my RAP application? 270.150 Section 270.150 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.150 How will the Director make a final decision on my RAP application? (a) The Director must consider and respond to any significant...

  15. 40 CFR 270.215 - How are time periods in the requirements in this subpart and my RAP computed?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements in this subpart and my RAP computed? 270.215 Section 270.215 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.215 How are time periods in the requirements in this subpart and my RAP computed? (a) Any time period scheduled to begin...

  16. 40 CFR 270.130 - What is the process for approving or denying my application for a RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... denying my application for a RAP? 270.130 Section 270.130 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.130 What is the process for approving or denying my application for a RAP? (a) If the Director tentatively finds that your...

  17. 40 CFR 270.165 - When may I begin physical construction of new units permitted under the RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of new units permitted under the RAP? 270.165 Section 270.165 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.165 When may I begin physical construction of new units permitted under the RAP? You must not begin physical construction of new...

  18. 40 CFR 270.165 - When may I begin physical construction of new units permitted under the RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of new units permitted under the RAP? 270.165 Section 270.165 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.165 When may I begin physical construction of new units permitted under the RAP? You must not begin physical construction of new...

  19. 40 CFR 270.155 - May the decision to approve or deny my RAP application be administratively appealed?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... RAP application be administratively appealed? 270.155 Section 270.155 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.155 May the decision to approve or deny my RAP application be administratively appealed? (a) Any commenter on the...

  20. 40 CFR 270.130 - What is the process for approving or denying my application for a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... denying my application for a RAP? 270.130 Section 270.130 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.130 What is the process for approving or denying my application for a RAP? (a) If the Director tentatively finds that your...

  1. 40 CFR 270.155 - May the decision to approve or deny my RAP application be administratively appealed?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RAP application be administratively appealed? 270.155 Section 270.155 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.155 May the decision to approve or deny my RAP application be administratively appealed? (a) Any commenter on the...

  2. 40 CFR 270.90 - Does my RAP grant me any rights or relieve me of any obligations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Does my RAP grant me any rights or... PROGRAM Remedial Action Plans (RAPs) General Information § 270.90 Does my RAP grant me any rights or relieve me of any obligations? The provisions of § 270.4 apply to RAPs. (Note: The provisions of §...

  3. 40 CFR 270.175 - For what reasons may the Director choose to modify my final RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... choose to modify my final RAP? 270.175 Section 270.175 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.175 For what reasons may the Director choose to modify my final RAP? (a) The Director may...

  4. 40 CFR 270.90 - Does my RAP grant me any rights or relieve me of any obligations?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Does my RAP grant me any rights or... PROGRAM Remedial Action Plans (RAPs) General Information § 270.90 Does my RAP grant me any rights or relieve me of any obligations? The provisions of § 270.4 apply to RAPs. (Note: The provisions of §...

  5. 40 CFR 270.90 - Does my RAP grant me any rights or relieve me of any obligations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Does my RAP grant me any rights or... PROGRAM Remedial Action Plans (RAPs) General Information § 270.90 Does my RAP grant me any rights or relieve me of any obligations? The provisions of § 270.4 apply to RAPs. (Note: The provisions of §...

  6. 40 CFR 270.175 - For what reasons may the Director choose to modify my final RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... choose to modify my final RAP? 270.175 Section 270.175 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.175 For what reasons may the Director choose to modify my final RAP? (a) The Director may...

  7. 40 CFR 270.225 - What must the State or EPA Region report about noncompliance with RAPs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... report about noncompliance with RAPs? 270.225 Section 270.225 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.225 What must the State or EPA Region report about noncompliance with RAPs? The State or EPA Region must report noncompliance with...

  8. 40 CFR 270.155 - May the decision to approve or deny my RAP application be administratively appealed?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... RAP application be administratively appealed? 270.155 Section 270.155 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.155 May the decision to approve or deny my RAP application be administratively appealed? (a) Any commenter on the...

  9. 40 CFR 270.215 - How are time periods in the requirements in this subpart and my RAP computed?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements in this subpart and my RAP computed? 270.215 Section 270.215 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.215 How are time periods in the requirements in this subpart and my RAP computed? (a) Any time period scheduled to begin...

  10. 40 CFR 270.220 - How may I transfer my RAP to a new owner or operator?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false How may I transfer my RAP to a new... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.220 How may I transfer my RAP to a new owner or operator? (a) If you wish to transfer your RAP to a new owner or operator, you must follow the...

  11. 40 CFR 270.220 - How may I transfer my RAP to a new owner or operator?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false How may I transfer my RAP to a new... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.220 How may I transfer my RAP to a new owner or operator? (a) If you wish to transfer your RAP to a new owner or operator, you must follow the...

  12. 40 CFR 270.220 - How may I transfer my RAP to a new owner or operator?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false How may I transfer my RAP to a new... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.220 How may I transfer my RAP to a new owner or operator? (a) If you wish to transfer your RAP to a new owner or operator, you must follow the...

  13. 40 CFR 270.220 - How may I transfer my RAP to a new owner or operator?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false How may I transfer my RAP to a new... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.220 How may I transfer my RAP to a new owner or operator? (a) If you wish to transfer your RAP to a new owner or operator, you must follow the...

  14. 40 CFR 270.220 - How may I transfer my RAP to a new owner or operator?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false How may I transfer my RAP to a new... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.220 How may I transfer my RAP to a new owner or operator? (a) If you wish to transfer your RAP to a new owner or operator, you must follow the...

  15. 40 CFR 270.145 - What are the procedures for public comment on the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... comment on the draft RAP or notice of intent to deny? 270.145 Section 270.145 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.145 What are the procedures for public comment on the draft RAP or notice of intent to deny? (a) The Director must: (1)...

  16. 40 CFR 270.145 - What are the procedures for public comment on the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... comment on the draft RAP or notice of intent to deny? 270.145 Section 270.145 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.145 What are the procedures for public comment on the draft RAP or notice of intent to deny? (a) The Director must: (1)...

  17. 40 CFR 270.145 - What are the procedures for public comment on the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... comment on the draft RAP or notice of intent to deny? 270.145 Section 270.145 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.145 What are the procedures for public comment on the draft RAP or notice of intent to deny? (a) The Director must: (1)...

  18. 40 CFR 270.140 - What else must the Director prepare in addition to the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... addition to the draft RAP or notice of intent to deny? 270.140 Section 270.140 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.140 What else must the Director prepare in addition to the draft RAP or notice of intent to deny? Once the Director...

  19. 40 CFR 270.140 - What else must the Director prepare in addition to the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... addition to the draft RAP or notice of intent to deny? 270.140 Section 270.140 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.140 What else must the Director prepare in addition to the draft RAP or notice of intent to deny? Once the Director...

  20. 40 CFR 270.205 - What happens if I have applied correctly for a RAP renewal but have not received approval by the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... correctly for a RAP renewal but have not received approval by the time my old RAP expires? 270.205 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.205 What happens if I have...

  1. 40 CFR 270.205 - What happens if I have applied correctly for a RAP renewal but have not received approval by the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... correctly for a RAP renewal but have not received approval by the time my old RAP expires? 270.205 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.205 What happens if I have...

  2. 40 CFR 270.140 - What else must the Director prepare in addition to the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... addition to the draft RAP or notice of intent to deny? 270.140 Section 270.140 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.140 What else must the Director prepare in addition to the draft RAP or notice of intent to deny? Once the Director...

  3. 40 CFR 270.205 - What happens if I have applied correctly for a RAP renewal but have not received approval by the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... correctly for a RAP renewal but have not received approval by the time my old RAP expires? 270.205 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.205 What happens if I have...

  4. 40 CFR 270.140 - What else must the Director prepare in addition to the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... addition to the draft RAP or notice of intent to deny? 270.140 Section 270.140 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.140 What else must the Director prepare in addition to the draft RAP or notice of intent to deny? Once the Director...

  5. 40 CFR 270.145 - What are the procedures for public comment on the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... comment on the draft RAP or notice of intent to deny? 270.145 Section 270.145 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.145 What are the procedures for public comment on the draft RAP or notice of intent to deny? (a) The Director must: (1)...

  6. 40 CFR 270.140 - What else must the Director prepare in addition to the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... addition to the draft RAP or notice of intent to deny? 270.140 Section 270.140 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.140 What else must the Director prepare in addition to the draft RAP or notice of intent to deny? Once the Director...

  7. 40 CFR 270.205 - What happens if I have applied correctly for a RAP renewal but have not received approval by the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... correctly for a RAP renewal but have not received approval by the time my old RAP expires? 270.205 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.205 What happens if I have...

  8. 40 CFR 270.145 - What are the procedures for public comment on the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... comment on the draft RAP or notice of intent to deny? 270.145 Section 270.145 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.145 What are the procedures for public comment on the draft RAP or notice of intent to deny? (a) The Director must: (1)...

  9. 40 CFR 270.205 - What happens if I have applied correctly for a RAP renewal but have not received approval by the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... correctly for a RAP renewal but have not received approval by the time my old RAP expires? 270.205 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.205 What happens if I have...

  10. Remedial Action Plan for the codisposal and stabilization of the Monument Valley and Mexican Hat uranium mill tailings at Mexican Hat, Utah: Appendices C--E. Final report

    SciTech Connect

    1993-02-01

    This document provides appendices C, D, and E this Remedial Action Plan (RAP) which is a revision of the original Mexican Hat Remedial Action Plan and RAP Modification submitted in July 1988 and January 1989, respectively, along with updated design documents. Appendix C provide the Radiological Support Plan, Appendix D provides the Site Characterization, and Appendix E provides the Water Resources Protection Strategy.

  11. Planning as Action Research

    ERIC Educational Resources Information Center

    de Gonzalez, Carmen Beatriz; Hernandez, Teresa; Kusch, Jim; Ryan, Charly

    2004-01-01

    Planning contains so much more than the written plan. Early in 2000, an invitation came from the Collaborative Action Research Network (CARN), to people experienced in action research who might want to help plan and present an action research event for elementary school science teachers in Venezuela, South America, in Autumn 2000. This article…

  12. 40 CFR 270.85 - When do I need a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false When do I need a RAP? 270.85 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.85 When do I need a RAP? (a) Whenever you treat, store, or dispose of...

  13. 40 CFR 270.85 - When do I need a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false When do I need a RAP? 270.85 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.85 When do I need a RAP? (a) Whenever you treat, store, or dispose of...

  14. 40 CFR 270.85 - When do I need a RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false When do I need a RAP? 270.85 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.85 When do I need a RAP? (a) Whenever you treat, store, or dispose of...

  15. 40 CFR 270.85 - When do I need a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false When do I need a RAP? 270.85 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.85 When do I need a RAP? (a) Whenever you treat, store, or dispose of...

  16. 40 CFR 270.85 - When do I need a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false When do I need a RAP? 270.85 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.85 When do I need a RAP? (a) Whenever you treat, store, or dispose of...

  17. Rap1 and Rap2 Antagonistically Control Endothelial Barrier Resistance

    PubMed Central

    Pannekoek, Willem-Jan; Linnemann, Jelena R.; Brouwer, Patricia M.; Bos, Johannes L.; Rehmann, Holger

    2013-01-01

    Rap1 and Rap2 are closely related proteins of the Ras family of small G-proteins. Rap1 is well known to regulate cell-cell adhesion. Here, we have analysed the effect of Rap-mediated signalling on endothelial permeability using electrical impedance measurements of HUVEC monolayers and subsequent determination of the barrier resistance, which is a measure for the ease with which ions can pass cell junctions. In line with its well-established effect on cell-cell junctions, depletion of Rap1 decreases, whereas activation of Rap1 increases barrier resistance. Despite its high sequence homology with Rap1, depletion of Rap2 has an opposite, enhancing, effect on barrier resistance. This effect can be mimicked by depletion of the Rap2 specific activator RasGEF1C and the Rap2 effector MAP4K4, establishing Rap2 signalling as an independent pathway controlling barrier resistance. As simultaneous depletion or activation of both Rap1 and Rap2 results in a barrier resistance comparable to control cells, Rap1 and Rap2 control barrier resistance in a reciprocal manner. This Rap1-antagonizing effect of Rap2 is established independent of junctional actin formation. These data establish that endothelial barrier resistance is determined by the combined antagonistic actions of Rap1 and Rap2. PMID:23469100

  18. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  19. 40 CFR 270.180 - For what reasons may the Director choose to revoke and reissue my final RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... choose to revoke and reissue my final RAP? 270.180 Section 270.180 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.180 For what reasons may the Director choose to revoke and reissue my final...

  20. 40 CFR 270.180 - For what reasons may the Director choose to revoke and reissue my final RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... choose to revoke and reissue my final RAP? 270.180 Section 270.180 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.180 For what reasons may the Director choose to revoke and reissue my final...

  1. 40 CFR 270.180 - For what reasons may the Director choose to revoke and reissue my final RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... choose to revoke and reissue my final RAP? 270.180 Section 270.180 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.180 For what reasons may the Director choose to revoke and reissue my final...

  2. 40 CFR 270.180 - For what reasons may the Director choose to revoke and reissue my final RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... choose to revoke and reissue my final RAP? 270.180 Section 270.180 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.180 For what reasons may the Director choose to revoke and reissue my final...

  3. 40 CFR 270.170 - After my RAP is issued, how may it be modified, revoked and reissued, or terminated?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... modified, revoked and reissued, or terminated? 270.170 Section 270.170 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.170 After my RAP is issued, how may it be modified, revoked and reissued,...

  4. 40 CFR 270.180 - For what reasons may the Director choose to revoke and reissue my final RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... choose to revoke and reissue my final RAP? 270.180 Section 270.180 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.180 For what reasons may the Director choose to revoke and reissue my final...

  5. Postpartum Depression Action Plan

    MedlinePlus

    MENU Return to Web version Postpartum Depression | Postpartum Depression Action Plan Patient __________________________ Physician/NP/PA __________________ Clinic ____________________________ Phone Number ____________________ Choose one area and add other areas as you begin to ...

  6. An Action Research Study on the Influence of Gangsta Rap on Academic and Behavioral Issues of 5th Grade African-American Males

    ERIC Educational Resources Information Center

    Lewis, Shaun; Boes, Susan R.; Chibbaro, Julie S.

    2015-01-01

    This small action research study (ARS) began with a review of the literature examining the relationship of gangsta rap in regards to academic achievement, self-esteem, decision-making, identity issues and development of young African American males. The purpose of the ARS was to examine the correlation between gangsta rap and its influence on 5th…

  7. ES H action plan

    SciTech Connect

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  8. Institutional frameworks to direct development and implementation of great lakes remedial action plans

    NASA Astrophysics Data System (ADS)

    Hartig, John H.; Law, Neely

    1994-11-01

    Locally designed, institutional frameworks are being used to develop and implement remedial action plans (RAPs) to restore beneficial uses in 43 Great Lakes areas of concern. A 1993 Canada-United States roundtable was convened to learn from case studies and to develop recommendations regarding essential characteristics of RAP institutional frameworks, guidance to ensure linkages to other related plans, and ways of embracing new institutional frameworks from RAP development to implementation. Major roundtable recommendations are: (1) RAP institutional frameworks should be empowered to pursue their mission of restoring uses. Empowerment would be demonstrated by: a watershed focus, inclusive and shared decision-making, clear responsibilities and sufficient authority, creative funding capability, flexibility and continuity in the process, an iterative process of continuous improvement, and commitment to education and outreach. (2) RAP institutional frameworks should be used as mechanisms to coordinate programs at the local level. Such local coordination should be complemented with governmental commitments to intra- and interagency coordination in work plans. (3) RAP institutional frameworks can help build the capacity of governments to achieve their goals. Therefore, governments must adopt long-term, visionary goals and commit to a customer-driven RAP process of continuous improvement.

  9. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    In order to develop an affirmative action plan at Triton College, the college President appointed a committee made up of nine representatives from the various college constituencies, the majority of which were women and minorities, to determine the objectives to be achieved and how to implement them, and to establish appropriate review procedures.…

  10. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Education, Oklahoma City.

    As mandated by law, this 1983 revision describes the Oklahoma State Department of Education's Affirmative Action Plan and analyzes the employment patterns of the department's work force for that year in light of equal employment opportunity goals. Following a brief policy statement, the development, dissemination, and implementation of the plan…

  11. 3RS action plan

    SciTech Connect

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  12. A demonstration of the applicability of implementing the enhanced Remedial Action Priority System (RAPS) for environmental releases

    SciTech Connect

    Whelan, G.; Droppo, J.G. Jr.; Strenge, D.L.; Walter, M.B.; Buck, J.W.

    1989-12-01

    The Remedial Action Priority System (RAPS) and the Multimedia Environmental Pollutant Assessment System (MEPAS) were developed to prioritize problems associated with potential releases of hazardous chemical and radioactive materials in a scientific and objective manner based on limited site information. This report documents the model testing efforts of the RAPS/MEPAS methodology for the atmospheric, surface water, groundwater, and exposure components. Comparisons are given of model outputs with measured data at three sites: the US Department of Energy's Mound facility in Ohio and Hanford facility in Washington, and a chromium-cadmium plating site in New York. The results show that the simulated magnitudes, spacial and temporal trends, and distributions of contaminants corresponded well with the measured data. 25 refs., 86 figs., 26 tabs.

  13. Mitigation Action Plan

    SciTech Connect

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  14. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    SciTech Connect

    Not Available

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section}7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  15. Neuronal Rap1 Regulates Energy Balance, Glucose Homeostasis, and Leptin Actions.

    PubMed

    Kaneko, Kentaro; Xu, Pingwen; Cordonier, Elizabeth L; Chen, Siyu S; Ng, Amy; Xu, Yong; Morozov, Alexei; Fukuda, Makoto

    2016-09-13

    The CNS contributes to obesity and metabolic disease; however, the underlying neurobiological pathways remain to be fully established. Here, we show that the small GTPase Rap1 is expressed in multiple hypothalamic nuclei that control whole-body metabolism and is activated in high-fat diet (HFD)-induced obesity. Genetic ablation of CNS Rap1 protects mice from dietary obesity, glucose imbalance, and insulin resistance in the periphery and from HFD-induced neuropathological changes in the hypothalamus, including diminished cellular leptin sensitivity and increased endoplasmic reticulum (ER) stress and inflammation. Furthermore, pharmacological inhibition of CNS Rap1 signaling normalizes hypothalamic ER stress and inflammation, improves cellular leptin sensitivity, and reduces body weight in mice with dietary obesity. We also demonstrate that Rap1 mediates leptin resistance via interplay with ER stress. Thus, neuronal Rap1 critically regulates leptin sensitivity and mediates HFD-induced obesity and hypothalamic pathology and may represent a potential therapeutic target for obesity treatment. PMID:27626668

  16. Guam Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  17. On the development and implementation of ecosystem management plans for water resources in the Great Lakes: A case study of the RAP initiative

    SciTech Connect

    MacKenzie, S.H.

    1991-01-01

    The ecosystem approach to water resource management is deceptively simple: one must recognize the interrelationships among water, land, air, and all living things and undertake resource planning in such a way that the integrity of the natural system is preserved. Significant features of the ecosystem approach include its watershed boundaries, its holistic orientation, and its assumption that humans should be viewed as part of, rather than apart from, the natural system. A theme of environmental ethics and education underlies the approach. Although it seems straightforward, the ecosystem approach has important implications for water management. In 1985, the International Joint Commission challenged government agencies to utilize the ecosystem approach to develop Remedial Action Plans to rehabilitate forty-two hotspots across the Great Lakes Basin. This initiative represented a first effort to implement the ecosystem approach in the Great Lakes. The research questions were: what does ecosystem management mean in the context of the RAP process, and how can one increase the likelihood of successful implementation of ecosystem management plans The research proposition suggests that there are three preconditions to ecosystem management: participation; decision making; and legitimacy. Comparative case studies of Green Bay, Wisconsin; Saginaw Bay, Michigan; and Hamilton Harbor, Ontario were undertaken. Thirty-five RAP participants were chosen for on-site indepth interviews. Data were arrayed by respondent, question, and case, and were analyzed for content.

  18. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  19. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  20. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  1. Final record of decision/remedial action plan, nine sites, Sierra Army Depot, Lassen County, California

    SciTech Connect

    Arroyo, S.L.; Larson, A.M.; Parent, M.M.; Silvers, J.M.; Weaverling, P.H.

    1996-10-01

    This ROD/RAP presents the selected response actions for nine sites at SIAD. The response actions were selected by the US Department of the Army (Army) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments Reauthorization Act of 1986 (SARA)(collectively referred to as CERCLA), the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), and Section 6.8 of the California Health and Safety Code. This ROD/RAP includes the factual and legal basis for selecting the response action at each of the nine sites listed above. The data used to support the selected response action are contained in the Administrative Record for each site. The State of California as represented by the Department of Toxic Substances Control (DTSC), and the Lahontan Regional Water Quality Control Board (RWQCB) concur with the selected response action at each site.

  2. Fraser River action plan: Introduction

    SciTech Connect

    1998-12-31

    This report reviews the Fraser River Action Plan, intended to foster a co-operative approach to restoring the environmental health of the Fraser watershed. Topics covered include the Plan`s ecosystem approach; the development of a new model of governance, with the goal of creating a body that would take responsibility for the well-being of the watershed; challenges and accomplishments of Plan programs; and future actions now that the Plan has ended. Completed and future programs are briefly reviewed in such areas as aquatic science, pollution, habitat, agriculture and the environment, and effects of forest practices.

  3. What's an Asthma Action Plan?

    MedlinePlus

    ... KidsHealth in the Classroom What Other Parents Are Reading Upsetting News Reports? What to Say Vaccines: Which ... flow meters. Action plans use symptoms, peak flow readings, or both to help you determine the zone ...

  4. Action Understanding as Inverse Planning

    ERIC Educational Resources Information Center

    Baker, Chris L.; Saxe, Rebecca; Tenenbaum, Joshua B.

    2009-01-01

    Humans are adept at inferring the mental states underlying other agents' actions, such as goals, beliefs, desires, emotions and other thoughts. We propose a computational framework based on Bayesian inverse planning for modeling human action understanding. The framework represents an intuitive theory of intentional agents' behavior based on the…

  5. American Samoa Energy Action Plan

    SciTech Connect

    Haase, Scott; Esterly, Sean; Herdrich, David; Bodell, Tim; Visser, Charles

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  6. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  7. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  8. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  9. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  10. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  11. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  12. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    SciTech Connect

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  13. One School's Positive Action Plan.

    ERIC Educational Resources Information Center

    McCormack, Sammie

    Because they felt that students can be responsible for their own behavior, the staff of Jefferson Elementary School, serving 300 students in grades 1 through 4 in a small rural community, developed a program which promoted self-management. In September 1979, teachers participated in an assertive discipline workshop. A Positive Action Plan evolved,…

  14. Texas Solar Collaboration Action Plan

    SciTech Connect

    Winland, Chris

    2013-02-14

    Texas Solar Collaboration Permitting and Interconenction Process Improvement Action Plan. San Antonio-specific; Investigate feasibility of using electronic signatures; Investigate feasibility of enabling other online permitting processes (e.g., commercial); Assess need for future document management and workflow/notification IT improvements; Update Information Bulletin 153 regarding City requirements and processes for PV; Educate contractors and public on CPS Energy’s new 2013 solar program processes; Continue to discuss “downtown grid” interconnection issues and identify potential solutions; Consider renaming Distributed Energy Resources (DER); and Continue to participate in collaborative actions.

  15. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Appendix E. Final report

    SciTech Connect

    1988-07-01

    This document provides Appendix E of the Remedial Action Plan (RAP) presented in 1988 for the stabilization of the inactive uranium mill tailings at the Mexican Hat, Utah site. The RAP was developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. The RAP has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action.

  16. Hungarian climate change action plan

    SciTech Connect

    Molnar, S.; Takacs, T.; Arpasi, M.; Farago, T.; Palvoelgyi, T.; Harnos, Z.; Lontay, Z.; Somogyi, Z.; Tajthy, T.

    1998-12-31

    In 1994--1996, within the framework of the US Country Studies Program, the Hungarian Country Study Team developed the national greenhouse gas emission inventory, and elaborated the mitigation options for the different sectors of the economy. In 1997, the development of a National Action Plan was begun as the continuation of this work. Results of the inventory study showed that greenhouse gas emissions decreased from the selected base level (i.e., from the yearly average emissions of 1985--1987) until 1994 by cca. 25%. However, this decrease was primarily caused by the deep economic recession. Therefore the policy makers have to face the problem of economic recovery without a relevant increase of greenhouse gas emissions in the near future. This is the main focus of the mitigation analysis and the National Action Plan.

  17. Remedial action plan for stabilization of the inactive uranium mill tailings site at Monument Valley, Arizona

    SciTech Connect

    1986-02-01

    This Remedial Action Plan (RAP) has been developed to serve a two-fold purpose. It presents the series of activities which are proposed by the U.S. Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Monument Valley, Arizona It also serves to document the concurrence of both the Navajo Nation and the U.S. Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

  18. Corrective Action Planning for Environmental Compliance Deficiencies

    SciTech Connect

    Sigmon, C. F.; Ashburn, S. A.; Jolley, R. L.; Smith, A. A.; Mercer, A. E.; Oeulette, B.; Renz, K.; Scott, S.

    1995-01-01

    Effective corrective action planning is one of the cornerstones of an effective environmental management program. Alternatively, ineffective planning can highlight an installation`s unwillingness or inability to effectively address environmental compliance deficiencies. The following paper discusses several guidelines to consider in corrective action planning to ensure that plans benefit rather than harm an installation`s overall environmental management program.

  19. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.220 Section 91.220 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Local Governments; Contents of Consolidated Plan § 91.220 Action plan....

  20. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.320 Section 91.320 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS State Governments; Contents of Consolidated Plan § 91.320 Action plan....

  1. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    SciTech Connect

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  2. Final Consolidated action plan to Tiger Team

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implemenation by Sandia and monitoring by DOE. This volume (2) contains information and corrective action plans pertaining to safety and health and management practices.

  3. 76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... the draft, A Public Health Action Plan to Combat Antimicrobial Resistance (76 FR 14402). Written and... HUMAN SERVICES Centers for Disease Control and Prevention Draft Action Plan--A Public Health Action Plan...), Department of Health and Human Services (DHHS). ACTION: Extension of public comment period. SUMMARY: On...

  4. Final consolidated action plan to Tiger Team

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implementation by Sandia and monitoring by DOE. This volume (I) contains the findings and actions concerning the environment. Tables 4.2 and 4.7 summarize the annual costs estimated for completing the actions. The total costs for completion of all the actions are estimated to be $283 million over a 12 year period; the majority of the actions to be completed and costs incurred in the first five years. Resources are provided from DOE-ER/WM, the DOE/DP landlord funds (one time, physical fixes), and from the Sandia Indirect Budget.

  5. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report. Revised final report

    SciTech Connect

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose. First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.

  6. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report

    SciTech Connect

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose. First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.

  7. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Chernoff, A.R. . Uranium Mill Tailings Remedial Action Project Office); Lacker, D.K. . Bureau of Radiation Control)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  8. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Remedial action selection report, Attachment 2, Geology report: Preliminary final

    SciTech Connect

    Not Available

    1993-08-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this document and the rest of the RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the State of Colorado.

  9. Ten Benefits of Participant Action Planning.

    ERIC Educational Resources Information Center

    Youker, Robert B.

    1985-01-01

    Describes the Participant Action Planning Approach (PAPA) process that requires each trainee to prepare a list of concrete actions or changes he or she plans to make back on the job once the training program is over. Benefits of PAPA are discussed, including transfer of learning, verbalization, and commitment. (CT)

  10. NORTH AMERICAN REGIONAL ACTION PLAN ON MERCURY

    EPA Science Inventory

    The North American Regional Action Plan (NARAP) on Mercury is one of a number of action plans that stem from the North American Agreement on Environmental Cooperation between the governments of Canada, Mexico and the United States. That Agreement established the Commission for En...

  11. Exploiting map plans as resources for action

    NASA Technical Reports Server (NTRS)

    Payton, David

    1989-01-01

    When plans are used as programs for controlling the action of autonomous or teleoperated robots, their abstract representation can easily obscure a great deal of the critical knowledge that originally led to the planned course of action. An autonomous vehicle experiment is highlighted which illustrates how the information barriers created by abstraction can result in undesirable action. It is then shown how the same task can be performed correctly using plans as a resource for action. As a result of this simple change in outlook, problems requiring opportunistic reaction to unexpected changes in the environment can be solved.

  12. Planning actions in robot automated operations

    NASA Technical Reports Server (NTRS)

    Das, A.

    1988-01-01

    Action planning in robot automated operations requires intelligent task level programming. Invoking intelligence necessiates a typical blackboard based architecture, where, a plan is a vector between the start frame and the goal frame. This vector is composed of partially ordered bases. A partial ordering of bases presents good and bad sides in action planning. Partial ordering demands the use of a temporal data base management system.

  13. The Development of Action Planning in a Joint Action Context

    ERIC Educational Resources Information Center

    Paulus, Markus

    2016-01-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus.…

  14. The development of action planning in a joint action context.

    PubMed

    Paulus, Markus

    2016-07-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus. Their task was to hand the experimenter a tool with which she could activate 1 of 2 different effects on the apparatus. The elicitation of each effect required participants to grasp and insert the tool in a particular orientation. We assessed whether participants planned their grasping and reaching action in such a way that it enabled the partner to efficiently handle the tool, that is, anticipating the final end state of the joint activity. We found that 3-year-old children did not adjust their behavior to accommodate the other's action and that they did not increase their performance over multiple trials. Five- and 7-year-old children initially showed a tendency to plan their action in an egocentric manner (i.e., showed a form of egocentrism), but improved their joint action performance over time. Adult participants demonstrated joint action planning from the beginning. Interestingly, 3- and 5-year-old children were able to plan their grasp efficiently when acting alone on the apparatus. Yet, having first-hand experience with the task before acting with a partner did not facilitate performance in the joint action task for younger children. Overall, the study informs current approaches on the psychological basis and ontogenetic origins of joint action in childhood. (PsycINFO Database Record PMID:27337512

  15. Modification No. 2 to the remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Green River, Utah: Final

    SciTech Connect

    1996-11-01

    Portions of the final Remedial Action Plan (RAP) for the Green River site, Volumes 1 and 2, Appendix B of the Cooperative Agreement No. DE-FC04-81AL16257, March 1991 (DOE, 1991) have been modified. The changes to the RAP are designated as RAP Modification No. 2. These changes have been placed in a three-ring binder that will supplement the original RAP (DOE, 1991), and include the following: addendum to the Executive Summary; Section 3.5 (Ground Water part of the Site Characterization Summary); Section 4.0 (Site Design); Section5.0 (Water Resources Protection Strategy Summary); Appendix D.5 (Ground Water Hydrology); and Appendix E (Ground Water Protection Strategy). In addition to these revisions, there have been editorial changes that clarify the text, but do not change the meaning. Also, certain sections of the document, which are included in the submittal for ease of review and continuity, have been updated to reflect the final ground water protection standards and the current UMTRA Project format and content of RAPs.

  16. 29 CFR 30.4 - Affirmative action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 1 2014-07-01 2013-07-01 true Affirmative action plans. 30.4 Section 30.4 Labor Office of... action plans. (a) Adoption of affirmative action plans. A sponsor's commitment to equal opportunity in... affirmative action plan. (b) Definition of affirmative action. Affirmative action is not mere...

  17. 29 CFR 30.4 - Affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 1 2013-07-01 2013-07-01 false Affirmative action plans. 30.4 Section 30.4 Labor Office of... action plans. (a) Adoption of affirmative action plans. A sponsor's commitment to equal opportunity in... affirmative action plan. (b) Definition of affirmative action. Affirmative action is not mere...

  18. 29 CFR 30.4 - Affirmative action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Affirmative action plans. 30.4 Section 30.4 Labor Office of... action plans. (a) Adoption of affirmative action plans. A sponsor's commitment to equal opportunity in... affirmative action plan. (b) Definition of affirmative action. Affirmative action is not mere...

  19. The Climate Change Action Plan: Technical supplement

    SciTech Connect

    Not Available

    1994-03-01

    This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

  20. National Security Technology Incubator Action Plan

    SciTech Connect

    2008-02-28

    This report documents the action plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). This action plan serves as a tool in measuring progress in the development process and delivery of services for the NSTI program. Continuous review and evaluation of the action plan is necessary in the development process of the NSTI. The action plan includes detailed steps in developing the NSTI program based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Included are tasks required to implement the NSTI, developed within a work breakdown structure. In addition, a timeline is identified for each task.

  1. Gathering Strength: Canada's Aboriginal Action Plan.

    ERIC Educational Resources Information Center

    Department of Indian Affairs and Northern Development, Ottawa (Ontario).

    Designed to renew the relationship between the Canadian government and the Aboriginal peoples of Canada, this action plan contains a statement of reconciliation, a statement of renewal, and four key objectives for action. First, renewing partnerships includes community-based healing to address the negative effects of the residential schools…

  2. SOCIAL ACTION AND INTERACTION IN PROGRAM PLANNING.

    ERIC Educational Resources Information Center

    BEAL, GEORGE M.; AND OTHERS

    TWO RESEARCH FRAMEWORKS, SOCIAL ACTION AND GROUP FORMATION AND MAINTENANCE, WERE CHOSEN TO ANALYZE THE EFFECTIVENESS OF COMMUNICATION STRATEGIES EMPLOYED BY EXTENSION WORKERS. IN A STUDY ON THE INTRODUCTION OF PROGRAM PLANNING INTO A COUNTY, THE FULFILLMENT OF EACH OF 34 STEPS IN THE SOCIAL ACTION PROCESS WAS ANALYZED AND FOUND TO BE ONLY SOMEWHAT…

  3. Addressing Youth Victimization. Action Plan Update.

    ERIC Educational Resources Information Center

    Osofsky, Joy D.

    The Coordinating Council on Juvenile Justice and Delinquency Prevention published an action plan in 1996 that established eight objectives as the foundation for innovative and effective action by federal, state, and local governments, in partnership with private sector organizations, to reduce juvenile violence and victimization. This bulletin…

  4. Action Planning and Recording Achievement.

    ERIC Educational Resources Information Center

    Green, Muriel

    This document examines strategies and procedures that British further education (FE) colleges can use to develop and enhance systems and structures for guiding and supporting learners and learning. It is based on the findings of a field test of the Managing Learning model for planning and recording the process of FE students. First, the importance…

  5. Affirmative Action Plan. Fourth Edition.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    The aim of this plan is to provide the reader with an outline of the New York State Education Department's commitment to equal employment opportunity and its obligation to comply with various anti-discrimination laws. These laws include the New York State Human Rights Law, the Federal Equal Employment Opportunity Act of 1972, Section 504 of the…

  6. Individual Action Planning: A Practical Guide.

    ERIC Educational Resources Information Center

    Squirrell, Gillian

    This book, which is intended as a practical guide for British teachers and tutors involved in career guidance, explains the process of helping students develop Individual Action Plans (IAPs). IAPs are plans outlining individual personal, vocational, and educational aspirations that students develop in a series of discussion sessions with an…

  7. Ensuring preparedness: Testing an emergency action plan

    SciTech Connect

    Gibson, J.Z.; Hildebrand, L.G. )

    1992-12-01

    For dam owners, having a plan for responding to dam failure is not enough. To ensure that operating personnel and local authorities and emergency response agencies are prepared, the plan needs to be tested periodically. This article describes how Washington Water Power tested its emergency action plan at its Cabinet Gorge project in September, 1990. The objectives, details, and critique of the test are described, as is FERC's five-level exercise testing program.

  8. Remedial action planning for Trench 1

    SciTech Connect

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.

    1998-07-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

  9. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    SciTech Connect

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  10. Sequencing formally defined reactions for robotic activity: integrating RAPS and GAPPS

    NASA Astrophysics Data System (ADS)

    Slack, Marc G.

    1992-11-01

    Construction of robots which operate in unstructured environments has of late produced a number of approaches for transforming sensor readings into activity in the world. Most of these approaches provide no formal semantics for discussing the way in which the internal state of the robot maps to the desired state of the world. We have been investigating the use of the GAPPS programming language as a mechanism for defining robotic reactions. This work has resulted in the creation of reactive modules which mediate between discrete statements about world states to achieve or maintain and the required continuous activity. While relatively complex goals have been achieved with this approach, the syntax and semantics of the GAPPS language is inappropriate for complicated dynamically changing goals. As a result, we have begun investigating the use of Reactive Action Packages (RAPs) as a mechanism for sequencing the activation of GAPPS-based reactive skills. The motivation for using RAPs is twofold. First, the syntax and semantics of the RAPs language integrates smoothly with a traditional non-linear planning system, allowing the construction and execution of plans for increasingly complex tasks. Second, GAPPS-based reactions fulfill a missing component of a RAPs-based controller system, namely the transformation of discrete RAP primitives (e.g., (maintain grasp ?thing)) into continuous physical activity. This paper presents the approach we are taking and discusses some of the issues involved in integrating these two systems.

  11. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Remedial Action Selection Report, Appendix B of Attachment 2: Geology report, Final

    SciTech Connect

    Not Available

    1994-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section} 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which describes the proposed remedial action for the Naturita site. An extensive amount of data and supporting information has been generated and evaluated for this remedial action. These data and supporting information are not incorporated into this single document but are included or referenced in the supporting documents. The RAP consists of this RAS and four supporting documents or attachments. This Attachment 2, Geology Report describes the details of geologic, geomorphic, and seismic conditions at the Dry Flats disposal site.

  12. ICDF Complex Remedial Action Work Plan

    SciTech Connect

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  13. Final Action Plan to Tiger Team

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  14. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Affirmative action plan standards. 152.409... action plan standards. (a) Each affirmative action plan required by this subpart shall be developed in... ethnic group with the highest selection rate. (b) Each affirmative action plan required by this...

  15. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Affirmative action plan standards. 152.409... action plan standards. (a) Each affirmative action plan required by this subpart shall be developed in... ethnic group with the highest selection rate. (b) Each affirmative action plan required by this...

  16. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Affirmative action plan standards. 152.409... action plan standards. (a) Each affirmative action plan required by this subpart shall be developed in... ethnic group with the highest selection rate. (b) Each affirmative action plan required by this...

  17. 7 CFR 275.16 - Corrective action planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which:...

  18. Emergency Action Plans in Physical Education

    ERIC Educational Resources Information Center

    Tanis, Cindy J.; Hebel, Susan L.

    2016-01-01

    Emergency Action Plans (EAP) are essential to properly manage injuries and illnesses in physical education and sport. However, most literature discusses EAP's in the athletic arena instead of physical education. The purpose of this study was to examine physical education instructors' experiences of student illness and injury, discuss the steps of…

  19. Triton College Faculty Recruitment Action Plan (FRAP).

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    Triton College's (Illinois) Faculty Recruitment Action Plan (FRAP) provides a detailed guide to hiring new faculty, focusing on the desired characteristics of new faculty; marketing and recruitment strategies; employment incentives; the application, interviewing, and selection process; new faculty orientation; a timeline for implementation; cost…

  20. Action Plan for Florida's Public Libraries. Addendum.

    ERIC Educational Resources Information Center

    Florida Library Study Commission, Tallahassee.

    The introduction to this addendum (the Action Plan is LI 004 521) discusses the present use by libraries of information-handling technology and identifies some of the trends taking place in performing essential library services. While some limited inroads have been made in automating certain public library functions, the bulk of services is still…

  1. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... for recreation use, derelict and other public lands not designated for recreation; and...

  2. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... for recreation use, derelict and other public lands not designated for recreation; and...

  3. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 13471; 3 CFR, 1984 Comp., p. 193). (b) In this connection, and concurrently with the war or national... 47 Telecommunication 5 2012-10-01 2012-10-01 false Planned actions. 214.4 Section 214.4 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL PROCEDURES FOR THE USE...

  4. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 13471; 3 CFR, 1984 Comp., p. 193). (b) In this connection, and concurrently with the war or national... 47 Telecommunication 5 2014-10-01 2014-10-01 false Planned actions. 214.4 Section 214.4 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL PROCEDURES FOR THE USE...

  5. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 13471; 3 CFR, 1984 Comp., p. 193). (b) In this connection, and concurrently with the war or national... 47 Telecommunication 5 2011-10-01 2011-10-01 false Planned actions. 214.4 Section 214.4 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL PROCEDURES FOR THE USE...

  6. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 13471; 3 CFR, 1984 Comp., p. 193). (b) In this connection, and concurrently with the war or national... 47 Telecommunication 5 2013-10-01 2013-10-01 false Planned actions. 214.4 Section 214.4 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL PROCEDURES FOR THE USE...

  7. Housekeeping category corrective action unit work plan

    SciTech Connect

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  8. Action plan for the Tiger Team assessment report

    SciTech Connect

    Not Available

    1990-08-30

    This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

  9. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  10. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  11. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  12. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  13. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  14. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    SciTech Connect

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  15. The WHO's action plan for oral health.

    PubMed

    Monajem, S

    2009-02-01

    The oral health action plan, recommended for adoption to the Sixtieth World Health Assembly of the World Health Organization in January 2007, included many of the necessary components. Had fissure sealants been added to the list of prevention methods and the roles of dental educational institutions and hygiene community better clarified, the action plan would have made a more viable and realistic package for the ministries and their directors of national programmes receiving the support of the World Health Organization and partners. Sealants remain under-utilized, few dental hygienists are integrated in the primary oral health team and fewer dental graduates have had service-learning experiences--all contradictory to the evidence in the literature. Translating research findings into public health action programmes is one of the recommendations made in the action plan and one way we can begin this is by implementing sealant programmes in 'Health Promoting Schools' that are WHO's brain child and borne of the wisdom of using schools as 'platforms' for the promotion and delivery of health care to the community. PMID:19215314

  16. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Shiprock, New Mexico

    SciTech Connect

    Hill, T.V.; Morley, J.A. . Uranium Mill Tailings Remedial Action Project Office); Began, E.T. )

    1985-06-01

    This Remedial Action Plan (RAP) has been developed to serve a twofold purpose. It presents the series of activities which are proposed by the Department of Energy (DOE) to effect long-term control of radioactive materials at the inactive uranium processing site located on the Navajo Reservation at Shiprock, New Mexico. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Shiprock site. Detailed supporting information can be found in appendices and referenced documents. Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 traces the history of operations at the Shiprock site with a description of the present site characteristics. Section 4.0 provides a definition of site-specific problems, a listing of remedial action alternatives which have been considered, and the action which is being proposed. Section 5.0 presents a summary of the conceptual design for the proposed action which includes objectives, design features, schedule, cost, and implementation methods. Section 6.0 summarizes the plan for ensuring health and safety protection for the surrounding community and the onsite workers. Section 7.0 presents a detailed listing of the responsibilities of the project participants. Section 8.0 describes the quality assurance process that will be used by the RAC during construction. Section 9.0 describes the features of the long-term maintenance and surveillance plan. Section 10.0 documents the on-going activities to keep the public informed and participating in the project. Attached as part of the RAP are five appendices which describe in more detail various aspects of the remedial action.

  17. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Establishing affirmative action plans. 1608.4 Section 1608... AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.4 Establishing affirmative action plans. An affirmative action plan or program under this section shall...

  18. 76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ..., Prevention and Control, Research, and Product Development. The Action Plan contains specific action items... Healthcare Research and Quality (AHRQ), the Centers for Medicare and Medicaid Services (CMS), the Health.... Tanja Popovic, Deputy Associate Director for Science, Centers for Disease Control and...

  19. National Biofuels Action Plan, October 2008

    SciTech Connect

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  20. Fraser River action plan: Aquatic science

    SciTech Connect

    1998-12-31

    Reviews research carried out under the Fraser River Action Plan in the field of aquatic science, beginning with research carried out on Fraser River headwater lakes and the contaminants found in those lakes and their fish. Subsequent sections cover research on sediment and contaminant transport, benthic communities, fish species distribution, contaminants in fish, pollution sources (from urban runoff, agriculture, and forestry), pollution in the Fraser estuary, and environmental indicators.

  1. Fraser River action plan: Forest industries

    SciTech Connect

    1998-12-31

    This research reviews the activities conducted under the Fraser River Action Plan with regard to forest industries and their effects on the Fraser River Basin environment. The review covers the following topics: Projects to cut pollution from wood preservatives and pulp/paper mills; ecological effects of pulp mill effluents; wood waste and its utilization; habitat conservation; environmentally sound forestry practices; riparian conservation; habitat and ecosystem protection; and the use of economic instruments as an alternative to regulation.

  2. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report: Attachment 2, Geology report; Attachment 3, Groundwater hydrology report; Attachment 4, Water resources protection strategy: Final report

    SciTech Connect

    Chernoff, A.R.; Lacker, D.K.

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  3. 24 CFR 248.217 - Revisions to plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AUTHORITIES PREPAYMENT OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income Preservation Act of 1987 § 248.217 Revisions to plan of action. The owner may from time to...

  4. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Ambrosia Lake, New Mexico

    SciTech Connect

    Matthews, M.L. . Uranium Mill Tailings Remedial Action Project Office); Mitzelfelt, R. . Environmental Improvement Div.)

    1991-11-01

    This Remedial Action Plan (RAP) has been developed to serve a dual purpose. It presents the series of activities that is proposed by the US Department of Energy (DOE) to stabilize and control radioactive materials at the inactive Phillips/United Nuclear uranium processing site designated as the Ambrosia Lake site in McKinley County, New Mexico. It also serves to document the concurrence of both State of New Mexico and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

  5. Remedial Action Plan and final design for stabilization of the inactive uranium mill tailings at Green River, Utah. Volume 1, Text, Appendices A, B, and C: Final report

    SciTech Connect

    Matthews, M.L.; Alkema, K.

    1991-03-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities that are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Green River, Utah. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the state of Utah and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state of Utah, and concurrence by the NRC, becomes Appendix 8 of the Cooperative Agreement.

  6. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Affirmative action plans. 34.8 Section 34..., applicants or recipients shall have an acceptable affirmative action plan which has been approved by the... paragraph (c) of this section. The affirmative action plan must set forth overall goals and timetables...

  7. 29 CFR 30.4 - Affirmative action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... these regulations, sponsors are expected to make appropriate adjustments in goal levels. See 29 CFR 30.8... affirmative action plan. (b) Definition of affirmative action. Affirmative action is not mere passive... affirmative action plan must also include adequate provision for outreach and positive recruitment that...

  8. Fraser River action plan: Urban issues

    SciTech Connect

    1998-12-31

    This report reviews the state of the environment around urban areas on the Fraser River watershed and Fraser River Action Plan activities as they relate to minimizing the effect of urban areas on the environment. Subjects covered include the effect of cities on the environment; signs of urban stress; the importance of urban runoff as a pollution source, with a case study of the Brunette River watershed; sewage treatment and water conservation; non-point sources of pollution and management practices; recycling; contaminated sites; air quality and its management; habitat protection; and wood waste as a potential resource.

  9. Affirmative Action Plan, October 1991--September 1992

    SciTech Connect

    Not Available

    1991-10-01

    This report documents Reynolds Electrical Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the Handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations. All personnel decisions are made at the Company level. Decisions regarding the General Manager or Deputy General Manager are made at the corporate level.

  10. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management activities under a RAP at a location removed from the area where the remediation wastes originated... Plans (RAPs) Obtaining A Rap for An Off-Site Location § 270.230 May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes...

  11. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management activities under a RAP at a location removed from the area where the remediation wastes originated... Plans (RAPs) Obtaining A Rap for An Off-Site Location § 270.230 May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes...

  12. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management activities under a RAP at a location removed from the area where the remediation wastes originated... Plans (RAPs) Obtaining A Rap for An Off-Site Location § 270.230 May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes...

  13. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... management activities under a RAP at a location removed from the area where the remediation wastes originated... Plans (RAPs) Obtaining A Rap for An Off-Site Location § 270.230 May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes...

  14. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. Remedial action selection report: Attachment 2, geology report; Attachment 3, ground water hydrology report; Attachment 4, supplemental information

    SciTech Connect

    1998-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the U.S. Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section} 7901 et seq. Part of the UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, becomes Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  15. Remedial Action Plan for the codisposal and stabilization of the Monument Valley and Mexican Hat uranium mill tailings at Mexican Hat, Utah

    SciTech Connect

    1993-02-01

    This document is a revision of the original Mexiacan Hat Remedial Action Plan (RAP) and RAP Modification submitted in July 1988 and January 1989, respectively, along with updated design documents. This RAP has been developed to serve a two-fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3. 0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 presents the water resources protection strategy. Section 6.0 summarizes the plan for ensuring health and safety protection for the surrounding community and the on- site workers. Section 7.0 lists the responsibilities of the project participants. Section 8.0 describes the features of the long-term surveillance and maintenance plan.

  16. 77 FR 38296 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... HUMAN SERVICES Centers for Disease Control and Prevention Draft Public Health Action Plan--A National Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... Federal Register requesting public comment on the draft National Public Health Action Plan for...

  17. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... HUMAN SERVICES Centers for Disease Control and Prevention Draft Public Health Action Plan--A National Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... requesting public comment on the draft National Public Health Action Plan for the Detection, Prevention,...

  18. SADC establishes a regional action plan.

    PubMed

    Klouda, T

    1997-02-01

    The regional meeting held on AIDS strategy in Lilongwe, Malawi, in December, 1996, made important advances. The 12 countries of the SADC (Southern Africa Development Community) joined the European Union to institute a regional action plan for the reduction of susceptibility of people to HIV because of social, cultural, and environmental factors; the vulnerability of people with HIV infection to social and other difficulties; and the vulnerability of institutions because of the foregoing impacts. At the conference the issues explored were employment, mining, medical drugs, education, and tourism. An employment charter was seen as crucial for the success of AIDS and workplace activities. Facilitation of travel across borders was important for the reduction of susceptibility to HIV infection. Enhancement of regional policies for essential drugs was vital for drugs for the treatment of AIDS. The clarification of the regional role was critical for regional support of national action (strengthening technical and institutional capacities) and for regional joint action such as studies on research, harmonization of data collection on HIV/AIDS; organization of training; development of information and education on HIV/AIDS; facilitation of manufacturing of drugs and condoms; and the development of a regional information and education program about HIV/AIDS. The conference also clarified HIV/AIDS programs in relation to other health and socioeconomic problems. PMID:12292055

  19. Clean slate corrective action investigation plan

    SciTech Connect

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

  20. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 543: LIQUID DISPOSAL UNITS, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2006-09-01

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved Corrective Action Decision Document.

  1. 78 FR 42071 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance... the public comment period for the proposed guidance ``PAG Manual: Protective Action Guides (PAGs)...

  2. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Spook, Wyoming

    SciTech Connect

    Matthews, M L; Sullivan, M

    1990-04-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at an inactive uranium processing site northeast of Casper, Wyoming, and referred to as the Spook site. It provides a characterization of the present conditions at the site and also serves to document the concurrence of the State of Wyoming and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the State of Wyoming, and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement.

  3. Rap Music in the Classroom?

    ERIC Educational Resources Information Center

    Anderson, Edward

    1993-01-01

    Discusses the background of rap music, its definition, its themes and messages, and rap as a blend of language and music. Offers ideas for its use in the classroom as a way to motivate and instruct students. (SR)

  4. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho. Final report

    SciTech Connect

    Matthews, M.L.; Nagel, J.

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho.

  5. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho

    SciTech Connect

    Matthews, M.L. . Uranium Mill Tailings Remedial Action Project Office); Nagel, J. . Div. of Environmental Quality)

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho.

  6. High altitude mine waste remediation -- Implementation of the Idarado remedial action plan

    SciTech Connect

    Hardy, A.J.; Redmond, J.V.; River, R.A.; Davis, C.S.

    1999-07-01

    The Idarado Mine in Colorado's San Juan Mountains includes 11 tailing areas, numerous waste rock dumps, and a large number of underground openings connected by over 100 miles of raises and drifts. The tailings and mine wastes were generated from different mining and milling operations between 1975 and 1978. the Idarado Remedial Action Plan (RAP) was an innovative 5-year program developed for remediating the impacts of historic mining activities in the San Miguel River and Red Mountain Creek drainages. The challenges during implementation included seasonal access limitations due to the high altitude construction areas, high volumes of runoff during snow melt, numerous abandoned underground openings and stopped-out veins, and high profile sites adjacent to busy jeep trails and a major ski resort town. Implementation of the RAP has included pioneering efforts in engineering design and construction of remedial measures. Innovative engineering designs included direct revegetation techniques for the stabilization of tailings piles, concrete cutoff walls and French drains to control subsurface flows, underground water controls that included pipelines, weeplines, and portal collection systems, and various underground structures to collect and divert subsurface flows often exceeding 2,000 gpm. Remote work locations have also required the use of innovative construction techniques such as heavy lift helicopters to move construction materials to mines above 10,000 feet. This paper describes the 5-year implementation program which has included over 1,000,000 cubic yards of tailing regrading, application of 5,000 tons of manure and 26,000 tons of limestone, and construction of over 10,000 feet of pipeline and approximately 45,000 feet of diversion channel.

  7. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true Formulation of...

  8. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Formulation of...

  9. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false Formulation of...

  10. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Formulation of...

  11. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Administration of affirmative action plan. 906.5 Section 906.5 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer...

  12. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Formulation of affirmative action plan. 906.4 Section 906.4 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer,...

  13. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Emergency action plans. 1917.30 Section 1917.30 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency action plans—(1) Scope and...

  14. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1917.30 Section 1917.30 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency action plans—(1) Scope and...

  15. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Emergency action plans. 1917.30 Section 1917.30 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency action plans—(1) Scope and...

  16. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  17. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  18. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  19. Final Consolidated action plan to Tiger Team. Volume 2

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implemenation by Sandia and monitoring by DOE. This volume (2) contains information and corrective action plans pertaining to safety and health and management practices.

  20. LP Daac Product Lifecyle Plan in Action

    NASA Astrophysics Data System (ADS)

    Bennett, S. D.

    2014-12-01

    The Land Processes Distributed Active Archive Center (LP DAAC) is a NASA Earth Observing System (EOS) Data and Information System (EOSDIS) DAAC that supports selected EOS Community non-standard data products such as the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) Global Emissivity Database (GED), and also supports NASA Earth Science programs such as Making Earth System Data Records for Use in Research Environments (MEaSUREs) to contribute in providing long-term, consistent, and mature data products. To support and deliver excellence for NASA data stewardship, and to accommodate long-tail data preservation with Community and MEaSUREs products, the LP DAAC introduces a Product Lifecycle Plan that features a phased project framework to facilitate long-term product preservation. The first phase, Inception, captures all artifacts applied by the Product Developer(s) and develops Earth Science Data Records based on product artifacts. The second phase, Active Archive, distributes, promotes and provides services for the matured products to the science community. The third and final phase, Long-term Archive, establishes a permanent preservation location for all project artifacts. This poster depicts the LP DAAC Product Lifecycle Plan in action using the LP DAAC recently released NASA WELD Version 1.5 artifacts and phased objectives.

  1. The Olympia Proceedings. Section VI: Analysis of the Action Plans.

    ERIC Educational Resources Information Center

    Meyers, Joel; And Others

    1982-01-01

    Within legislative, practice, and professional issues in school psychology, examples of action plans for hypothetical events are presented. These were produced by groups of conference participants to stimulate development of detailed plans for local, state and national use by school psychologists. Action plan resources and implementation and…

  2. On the Inclusion of Externally Controlled Actions in Action Planning

    ERIC Educational Resources Information Center

    Tsai, Jessica Chia-Chin; Knoblich, Gunther; Sebanz, Natalie

    2011-01-01

    According to ideomotor theories, perceiving action effects produced by others triggers corresponding action representations in the observer. We tested whether this principle extends to actions performed by externally controlled limbs and tools. Participants performed a go-no-go version of a spatial compatibility task in which their own actions…

  3. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... under 24 CFR part 970); (5) Five-year action plan. (i) General. The comprehensive plan shall include a... entities are set up to plan and implement the consolidated plans (under 24 CFR part 91), the PHA shall...-year action plan). 968.315 Section 968.315 Housing and Urban Development REGULATIONS RELATING...

  4. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... under 24 CFR part 970); (5) Five-year action plan. (i) General. The comprehensive plan shall include a... entities are set up to plan and implement the consolidated plans (under 24 CFR part 91), the PHA shall...-year action plan). 968.315 Section 968.315 Housing and Urban Development REGULATIONS RELATING...

  5. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  6. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  7. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  8. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  9. ORD Strategic Action Plan for Information Management / Information Technology 2011

    EPA Science Inventory

    ORD's Strategic Action Plan for IM/IT (2011) was collaboratively developed with input from ORD research and administrative personnel. It identifies actions necessary to support ORD's priority IM and IT needs.

  10. Creative Technology and Rap

    ERIC Educational Resources Information Center

    Ch'ien, Evelyn

    2011-01-01

    This paper describes how a linguistic form, rap, can evolve in tandem with technological advances and manifest human-machine creativity. Rather than assuming that the interplay between machines and technology makes humans robotic or machine-like, the paper explores how the pressure of executing artistic visions using technology can drive…

  11. Squaring to the Rap!

    ERIC Educational Resources Information Center

    Adams, Deborah

    2006-01-01

    This article describes an approach to teaching square dance that is advantageous for both the teacher and students. Lessons in dance become more meaningful to students when the music and vocabulary is consistent with experiences in their own lives. When students create their own squaring to the rap, lessons become more student-centered,…

  12. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implementation by Sandia and monitoring by DOE. This volume (I) contains the findings and actions concerning the environment. Tables 4.2 and 4.7 summarize the annual costs estimated for completing the actions. The total costs for completion of all the actions are estimated to be $283 million over a 12 year period; the majority of the actions to be completed and costs incurred in the first five years. Resources are provided from DOE-ER/WM, the DOE/DP landlord funds (one time, physical fixes), and from the Sandia Indirect Budget.

  13. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or...

  14. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or...

  15. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or...

  16. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or...

  17. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    SciTech Connect

    Not Available

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

  18. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d)...

  19. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Affirmative action plan: General. 152.407 Section 152.407 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Nondiscrimination in Airport Aid Program § 152.407 Affirmative action plan: General. (a) Except as provided...

  20. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Affirmative action plans. 34.8 Section 34.8 Public Lands: Interior Office of the Secretary of the Interior REQUIREMENTS FOR EQUAL OPPORTUNITY DURING CONSTRUCTION AND OPERATION OF THE ALASKA NATURAL GAS TRANSPORTATION SYSTEM § 34.8 Affirmative action plans. (a)(1) Within one hundred...

  1. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative...

  2. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Nondiscrimination in Airport Aid Program § 152.409 Affirmative action plan standards. (a) Each...

  3. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Affirmative action plans. 34.8 Section 34.8 Public Lands: Interior Office of the Secretary of the Interior REQUIREMENTS FOR EQUAL OPPORTUNITY DURING CONSTRUCTION AND OPERATION OF THE ALASKA NATURAL GAS TRANSPORTATION SYSTEM § 34.8 Affirmative action plans. (a)(1) Within one hundred...

  4. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative...

  5. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative...

  6. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative...

  7. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Affirmative action plans. 34.8 Section 34.8 Public Lands: Interior Office of the Secretary of the Interior REQUIREMENTS FOR EQUAL OPPORTUNITY DURING CONSTRUCTION AND OPERATION OF THE ALASKA NATURAL GAS TRANSPORTATION SYSTEM § 34.8 Affirmative action plans. (a)(1) Within one hundred and...

  8. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100 Emergency action plans. (a) Scope...

  9. Adult Basic Skills: Developing a Local Action Plan.

    ERIC Educational Resources Information Center

    Basic Skills Agency, London (England).

    This document presents advice from the United Kingdom's Basic Skills Agency regarding developing local action plans. The first 20% of the document defines basic skills and discusses the following action plan components: (1) an estimate of the area's need for basic skills training; (2) a target to reduce the area's estimated scale of need; (3)…

  10. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS Emergency Action Plans...

  11. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100 Emergency action plans. (a) Scope...

  12. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100 Emergency action plans. (a) Scope...

  13. Education for All: National Plan of Action, 2003-2015

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    Background: The Lao People's Democratic Republic (PDR) Education for All National Plan of Action (EFA NPA) for 2003-2015 seeks to accomplish three major tasks: equitable access, improved quality and relevance and strengthened education management. Purpose: To design a National Education For All Action Plan for basic education in Lao PDR which…

  14. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document is a compilation of different issues identified by the Tiger Teams at the several locations of the Sandia National Laboratory. In this volume there are findings/concerns and the resultant responses and planned actions for these issues. Also included are the schedules and costs for the planned actions.

  15. Smart Buildings: Business Case and Action Plan

    SciTech Connect

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  16. The role of action control and action planning on fruit and vegetable consumption.

    PubMed

    Zhou, Guangyu; Gan, Yiqun; Miao, Miao; Hamilton, Kyra; Knoll, Nina; Schwarzer, Ralf

    2015-08-01

    Globally, fruit and vegetable intake is lower than recommended despite being an important component to a healthy diet. Adopting or maintaining a sufficient amount of fruit and vegetables in one's diet may require not only motivation but also self-regulatory processes. Action control and action planning are two key volitional determinants that have been identified in the literature; however, it is not fully understood how these two factors operate between intention and behavior. Thus, the aim of the current study was to explore the roles of action control and action planning as mediators between intentions and dietary behavior. A longitudinal study with three points in time was conducted. Participants (N = 286) were undergraduate students and invited to participate in a health behavior survey. At baseline (Time 1), measures of intention and fruit and vegetable intake were assessed. Two weeks later (Time 2), action control and action planning were assessed as putative sequential mediators. At Time 3 (two weeks after Time 2), fruit and vegetable consumption was measured as the outcome. The results revealed action control and action planning to sequentially mediate between intention and subsequent fruit and vegetable intake, controlling for baseline behavior. Both self-regulatory constructs, action control and action planning, make a difference when moving from motivation to action. Our preliminary evidence, therefore, suggests that planning may be more proximal to fruit and vegetable intake than action control. Further research, however, needs to be undertaken to substantiate this conclusion. PMID:25819607

  17. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Corrective action plan. 280.66 Section...) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Release Response and Corrective Action for UST Systems Containing Petroleum or...

  18. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona

    SciTech Connect

    Not Available

    1989-08-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site near Tuba City, Arizona. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the Navajo Nation, the Hopi Tribe, US Bureau of Indian Affairs (BIA), and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE, the Navajo Nation, and the Hopi Tribe, and concurrence by NRC, becomes Appendix B of the Cooperative Agreement. Following the introduction, contents are as follows: Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 summarizes the plan for ensuring environmental, health, and safety protection for the surrounding community and the on-site workers. Section 6.0 presents a detailed listing of the responsibilities of the project participants. Section 7.0 describes the features of the long-term surveillance and maintenance plan. Section 8.0 presents the quality assurance aspects of the project. Section 9.0 documents the ongoing activities to keep the public informed and participating in the project.

  19. K basins interim remedial action health and safety plan

    SciTech Connect

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  20. Planning my actions to accommodate yours: joint action development during early childhood.

    PubMed

    Meyer, Marlene; van der Wel, Robrecht P R D; Hunnius, Sabine

    2016-05-01

    The planning and adjusting of one's actions in relation to an action partner is fundamental to smooth joint action. During their first years of life, children gradually become more engaged in joint actions. Here, we investigated whether and at what age children take their partner into account in their action plans to accommodate the other's actions. We focused on children's proactive planning (without prior experience) and flexible adjustment of action plans over time. In a behavioural study, we tested 96 children from four age groups (2½, 3, 3½ and 5 years) in a joint cup-stacking task. Children passed cups to their partner who had only one hand available (alternating over time) to build a tower. Children's response choices were assessed (i.e. passing the cup on the free or occupied side to their partner). The study yielded two major findings. At all ages, children proactively planned their actions in a way that accommodated their partner's actions. However, only by 3½ years did children start to flexibly integrate their partner into their action plans. Even at age 5, children only showed minimal adjustments to their action partner. Candidate processes underlying these developmental changes (e.g. inhibitory control, cognitive flexibility, perspective taking) are discussed. PMID:27069048

  1. Planning action No. 2 planning criteria. Arapaho and Roosevelt National Forests and Pawnee National Grassland. Forest plan revision

    SciTech Connect

    Not Available

    1992-06-01

    The development of planning criteria is the second phase in the revision of the Forest Plan. Planning criteria are designed to guide the collection and use of inventory data and information, the analysis of the management situation, and the design, formulation, and evaluation of alternatives. Volume I of Planning Action 2 describes the specific methods used to analyze the management situation. Volume II of the Planning Action 2 describes the analysis process planned for the Forest Plan Revision. It includes a discussion of how to formulate and evaluate the alternatives, plus a summary of the needs for completion of Planning Action 4, the Analysis of the Management Situation (AMS).

  2. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... involving incentives, an appraisal using the residential income approach; (7) In the case of a plan of... approval of the proposed plan of action. (Approved by the Office of Management and Budget under control... except for that documentation deemed “proprietary information” under § 248.101. (b) Contents. The plan...

  3. Action planning in a virtual context after prefrontal cortex damage.

    PubMed

    Zalla, T; Plassiart, C; Pillon, B; Grafman, J; Sirigu, A

    2001-01-01

    Patients with frontal lobe lesions are known to encounter severe problems in the organisation of their behaviour in everyday life. Script generation tasks assess the subject's conceptual ability to formulate and evaluate a coherent and structured plan of action. In the present study, we investigated to what extent neuropsychological deficits observed at the conceptual level of action knowledge lead to impairments in action execution. We examined seven patients with prefrontal cortex damage and sixteen normal subjects. Subjects were first asked to verbally formulate a plan of action and then to use this knowledge for 'executing' the actions in a virtual 3-dimensional interactive apartment presented on a computer screen. The results indicated that the presence of the realistic context improved patients' performance. However, specific impairments were observed in patients in the execution condition, namely actions slips, omissions, failure in initiating actions and purposeless displacements. Moreover, an analysis of planning time showed that, differently of the patients group, normal subjects spent more time during plan execution as compared to plan generation. These results suggest that after a frontal lobe lesion a defective formulation of a routine plan might affect the execution of the corresponding course of actions. PMID:11369400

  4. National Action Plan for Energy Efficiency Report

    SciTech Connect

    National Action Plan for Energy Efficiency

    2006-07-01

    Summarizes recommendations, key barriers, and methods for energy efficiency in utility ratemaking as well as revenue requirements, resource planning processes, rate design, and program best practices.

  5. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    SciTech Connect

    Not Available

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date.

  6. Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada

    SciTech Connect

    Bechtel Nevada

    1998-08-31

    This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

  7. The Effectiveness of Written Action Plans in Atopic Dermatitis.

    PubMed

    Sauder, Maxwell B; McEvoy, Alana; Sampson, Margaret; Kanigsberg, Nordau; Vaillancourt, Regis; Ramien, Michele L; Zemek, Roger

    2016-03-01

    Atopic dermatitis (AD) is a chronic dermatosis requiring a stepwise and dynamic approach to management. The use of written action plans has been shown to improve outcomes in other chronic diseases that require a similar incremental approach. A systematic review was performed to evaluate the effect of a written eczema action plan (EAP) in AD management and to identify characteristics of effective action plans in children with eczema. Only two trials were identified as eligible, which highlights the need for more research on EAPs. PMID:26776967

  8. Heart Truth for Women: An Action Plan

    MedlinePlus

    ... care provider, a registered dietitian, or a qualified nutritionist to help you develop a sensible plan for ... exercise specialists, physical and occupational therapists, dietitians or nutritionists, and psychologists or other mental health specialists. Rehab ...

  9. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Ambrosia Lake, New Mexico. Volume 1, Text, Appendices A, B, and C: Final report

    SciTech Connect

    Matthews, M.L.; Mitzelfelt, R.

    1991-11-01

    This Remedial Action Plan (RAP) has been developed to serve a dual purpose. It presents the series of activities that is proposed by the US Department of Energy (DOE) to stabilize and control radioactive materials at the inactive Phillips/United Nuclear uranium processing site designated as the Ambrosia Lake site in McKinley County, New Mexico. It also serves to document the concurrence of both State of New Mexico and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

  10. Learning through Participatory Action Research for Community Ecotourism Planning.

    ERIC Educational Resources Information Center

    Guevara, Jose Roberto Q.

    1996-01-01

    Ecologically sound tourism planning and policy require an empowering community participation. The participatory action research model helps a community gain understanding of its social reality, learn how to learn, initiate dialog, and discover new possibilities for addressing its situation. (SK)

  11. Controlling Asthma New Guidelines. New Medications. New Action Plans.

    MedlinePlus

    ... version of this page please turn Javascript on. New Guidelines. New Medications. New Action Plans. People everywhere and in every age ... I am putting the finishing touches on my new studio album that we hope to have out ...

  12. Plk2 Raps up Ras to subdue synapses

    PubMed Central

    Lee, Kea Joo; Hoe, Hyang-Sook

    2011-01-01

    We recently identified the activity-inducible protein kinase Plk2 as a novel overseer of the balance between Ras and Rap small GTPases. Plk2 achieves a profound level of regulatory control by interacting with and phosphorylating at least four Ras and Rap guanine nucleotide exchange factors (GEFs) and GTPase activating proteins (GAPs). Combined, these actions result in synergistic suppression of Ras and hyperstimulation of Rap signaling. Perturbation of Plk2 function abolished homeostatic adaptation of synapses to enhanced activity and impaired behavioral adaptation in various learning tasks, indicating that this regulation was critical for maintaining appropriate Ras/Rap levels. These studies provide insights into the highly cooperative nature of Ras and Rap regulation in neurons. However, different GEF and GAP substrates of Plk2 also controlled specific aspects of dendritic spine morphology, illustrating the ability of individual GAPs/GEFs to assemble microdomains of Ras and Rap signaling that respond to different stimuli and couple to distinct output pathways. PMID:21776418

  13. Rap Music and Choral Education.

    ERIC Educational Resources Information Center

    Bitz, Michael

    1998-01-01

    Suggests choral teachers use rap music to promote student interest and to teach music basics, such as rhythm, pitch, harmony, and timbre. Maintains that students can write the arrangements allowing them to gain experience in notating. Identifies selected recordings and offers an example of how to use rap music. (CMK)

  14. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report, attachment 2, geology report; attachment 3, groundwater hydrology report; and attachment 4, water resources protection strategy. Final report

    SciTech Connect

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  15. Climate Action Planning at the University of New Hampshire

    ERIC Educational Resources Information Center

    Cleaves, Sara M.; Pasinella, Brett; Andrews, Jennifer; Wake, Cameron

    2009-01-01

    Purpose: The purpose of this paper is to discuss the recent history of climate action planning at the University of New Hampshire (UNH), a public university with a long history of sustainability action and commitment. Items discussed include a partnership with Clean Air-Cool Planet (CA-CP) to produce a greenhouse gas (GHG) inventory tool that…

  16. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Corrective action plan. 280.66 Section 280.66 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE...

  17. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Corrective action plan. 280.66 Section 280.66 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE...

  18. 24 Command Fire Improvement Action Program Plan

    SciTech Connect

    GRIFFIN, G.B.

    2000-12-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

  19. Building air quality: Action plan, June 1998

    SciTech Connect

    1998-11-01

    To promote the use of these straightforward practices to improve IAQ, EPA and other leaders in the IAQ field developed this 8-step plan. This additional resource meets the needs of building owners and managers who want an easy-to-understand path for taking their building from current conditions and practices to the successful institutionalization of good IAQ management practices.

  20. Hawaii's Adolescent Wellness Plan: Laulima in Action.

    ERIC Educational Resources Information Center

    Hawaii State Dept. of Health, Honolulu.

    Based on a need in Hawaii for a multilevel responsibility and commitment to ensure adolescent wellness, the Hawaii Adolescent Wellness Team developed a plan based on research and discussions with a variety of professionals and community leaders in health, education, and social service. This resource handbook is designed to assist communities in…

  1. Action Planning in Young Children's Tool Use

    ERIC Educational Resources Information Center

    Cox, Ralf F. A.; Smitsman, Ad W.

    2006-01-01

    Tool use consists of at least two coupled phases of activities, involving multi-step problem solving. It therefore provides an interesting window on the development of planning in goal-directed behavior. This study investigated 2-year-olds' and 3-year-olds' hand use in picking up and subsequently using a tool for displacing a target-object towards…

  2. Action Planning: Rowing in the Same Direction

    ERIC Educational Resources Information Center

    Hewson, Kurtis; Adrian, Lorna

    2008-01-01

    Two years ago, as Claresholm Elementary School prepared for a new year with a new principal, it had the usual shopping list of ambitions--focus on student learning, support the staff, empower parents, and more. However, in examining the school's improvement plan it became apparent that the school staff had a unique opportunity to develop solid…

  3. Monitoring the Curriculum: From Plan to Action.

    ERIC Educational Resources Information Center

    Maglaras, Tom; Lynch, Deborah

    1988-01-01

    The Aurora Public School System (Colorado) has devised a plan to ensure implementation of the adopted curriculum. By developing a program monitoring process and incorporating it in a handbook, staff can rate their behavior and use "green flags" or "red alerts" to characterize subject area strengths and deficiencies. (MLH)

  4. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... of the effect of the proposed changes on existing tenants. (6) In the case of a plan of action involving incentives, an appraisal using the residential income approach; (7) In the case of a plan of... reasonably be expected to serve; and (8) A market study which demonstrates that the project is located in...

  5. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  6. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... responding to contaminated soil and ground water. In either case, owners and operators are responsible for... to the plan made by the implementing agency. They must monitor, evaluate, and report the results of... effective cleanup, begin cleanup of soil and ground water before the corrective action plan is...

  7. Crisis action planning and replanning using SIPE-2

    NASA Technical Reports Server (NTRS)

    Skidmore, Jennifer D.

    1993-01-01

    Rome Laboratory and DARPA are jointly sponsoring an initiative to develop the next generation of AI planning and scheduling technology focused on military operations planning, especially for crisis situations. SRI International has demonstrated their knowledge-based planning technology in this domain with a system called SOCAP, System for Operations Crisis Action Planning. SOCAP's underlying power comes from SIPE-2, a hierarchical, domain-independent, nonlinear AI planner also developed at SRI. This paper discusses the features of SIPE-2 that made it an ideal choice for military operations planning and which contributed greatly to SOCAP's success.

  8. White House Climate Action Plan Hotly Debated in Senate Hearing

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2014-01-01

    Emotions ran high among senators at a 16 January U.S. Senate hearing on the White House's Climate Action Plan; the hearing included administration officials and other supporters of the plan as well as opponents. The plan, which President Barack Obama presented in June 2013 (see Eos, 94(27), 239, doi:10.1002/2013EO270003), calls for cutting carbon pollution, preparing the nation for the impacts of climate change, and leading international efforts to address climate change.

  9. McClellan AFB Management Action Plan (MAP) submittal

    SciTech Connect

    Not Available

    1992-12-23

    This Management Action Plan ('Action Plan' or 'MAP') contains a status summary of the McClellan Air Force Base (McAFB) environmental restoration and compliance programs and presents a comprehensive strategy for implementing response actions necessary to protect human health and the environment. This strategy integrates activities under both the Installation Restoration Program (IRP) and the Environmental Compliance Program (ECP). This Action Plan is a dynamic document that will be updated on a regular basis using the change-a-page looseleaf binder concept for day-to-day revisions along with a subsection at the end of each chapter to highlight any modifications or innovations since the previous major annual review/update.

  10. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes originated... Plans (RAPs) Obtaining A Rap for An Off-Site Location § 270.230 May I perform remediation...

  11. An Affirmative Action Plan Response to Office of Civil Rights Enforcement Action.

    ERIC Educational Resources Information Center

    Stewart, Ned A., Jr.

    The affirmative action concept developed out of case law as the courts decided passive attempts at desegregating schools failed to achieve results and out of civil rights legislation as administrative agencies adopted the court-established standards. A major challenge of affirmative action plans is to prevent court-approved goals from becoming…

  12. Global tropospheric chemistry: A plan for action

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Prompted by an increasing awareness of the influence of human activity on the chemistry of the global troposphere, a panel was formed to (1) assess the requirement for a global study of the chemistry of the troposphere; (2) develop a scientific strategy for a comprehensive plan taking into account the existing and projected programs of the government; (3) assess the requirements of a global study in terms of theoretical knowledge, numerical modeling, instrumentation, observing platforms, ground-level observational techniques, and other related needs; and (4) outline the appropriate sequence and coordination required to achieve the most effective utilization of available resources. Part 1 presents a coordinated national blueprint for scientific investigations of biogeochemical cycles in the global troposphere. part 2 presents much of the background information of the present knowledge and gaps in the understanding of tropospheric chemical cycles and processes from which the proposed program was developed.

  13. The role of action planning and plan enactment for smoking cessation

    PubMed Central

    2013-01-01

    Background Several studies have reemphasized the role of action planning. Yet, little attention has been paid to the role of plan enactment. This study assesses the determinants and the effects of action planning and plan enactment on smoking cessation. Methods One thousand and five participants completed questionnaires at baseline and at follow-ups after one and six months. Factors queried were part of the I-Change model. Descriptive analyses were used to assess which plans were enacted the most. Multivariate linear regression analyses were used to assess whether the intention to quit smoking predicted action planning and plan enactment, and to assess which factors would predict quitting behavior. Subsequently, both multivariate and univariate regression analyses were used to assess which particular action plans would be most effective in predicting quitting behavior. Similar analyses were performed among a subsample of smokers prepared to quit within one month. Results Smokers who intended to quit smoking within the next month had higher levels of action planning than those intending to quit within a year. Additional predictors of action planning were being older, being female, having relatively low levels of cigarette dependence, perceiving more positive and negative consequences of quitting, and having high self-efficacy toward quitting. Plan enactment was predicted by baseline intention to quit and levels of action planning. Regression analysis revealed that smoking cessation after six months was predicted by low levels of depression, having a non-smoking partner, the intention to quit within the next month, and plan enactment. Only 29% of the smokers who executed relatively few plans had quit smoking versus 59% of the smokers who executed many plans. The most effective preparatory plans for smoking cessation were removing all tobacco products from the house and choosing a specific date to quit. Conclusion Making preparatory plans to quit smoking is important

  14. Beta band modulations underlie action representations for movement planning.

    PubMed

    Turella, Luca; Tucciarelli, Raffaele; Oosterhof, Nikolaas N; Weisz, Nathan; Rumiati, Raffaella; Lingnau, Angelika

    2016-08-01

    To be able to interact with our environment, we need to transform incoming sensory information into goal-directed motor outputs. Whereas our ability to plan an appropriate movement based on sensory information appears effortless and simple, the underlying brain dynamics are still largely unknown. Here we used magnetoencephalography (MEG) to investigate this issue by recording brain activity during the planning of non-visually guided reaching and grasping actions, performed with either the left or right hand. Adopting a combination of univariate and multivariate analyses, we revealed specific patterns of beta power modulations underlying varying levels of neural representations during movement planning. (1) Effector-specific modulations were evident as a decrease in power in the beta band. Within both hemispheres, this decrease was stronger while planning a movement with the contralateral hand. (2) The comparison of planned grasping and reaching led to a relative increase in power in the beta band. These power changes were localized within temporal, premotor and posterior parietal cortices. Action-related modulations overlapped with effector-related beta power changes within widespread frontal and parietal regions, suggesting the possible integration of these two types of neural representations. (3) Multivariate analyses of action-specific power changes revealed that part of this broadband beta modulation also contributed to the encoding of an effector-independent neural representation of a planned action within fronto-parietal and temporal regions. Our results suggest that beta band power modulations play a central role in movement planning, within both the dorsal and ventral stream, by coding and integrating different levels of neural representations, ranging from the simple representation of the to-be-moved effector up to an abstract, effector-independent representation of the upcoming action. PMID:27173760

  15. Team Planning to CLEAR Up Problems

    ERIC Educational Resources Information Center

    Koehler, Nancy

    2006-01-01

    Professionals and parents need effective systems of teamwork for planning restorative outcomes with troubled children and youth. This article taps the resilient problem-solving process C*L*E*A*R, which is drawn from the Response Ability Pathways (RAP) curriculum. Participants examine the timeline of Challenges, Logic, Emotions, Actions, and…

  16. 76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... QUALITY National Ocean Council; Strategic Action Plan Content Outlines AGENCY: Council on Environmental Quality. ACTION: Notice of Availability, Strategic Action Plan Content Outlines; Request for Comments... priority objectives. As a first step, Federal interagency writing teams have developed content outlines...

  17. 24 CFR 248.135 - Plans of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Plans of action. 248.135 Section 248.135 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MORTGAGE AND LOAN...

  18. State Action Plan for Iowa. "Marketing" Marketing Education.

    ERIC Educational Resources Information Center

    Omega Group, Inc., Haverford, PA.

    An Iowa project identified curriculum, program standards, and a framework for promoting marketing education programs. The mission for the state action plan for marketing education is to develop a strategy to revitalize Iowa's marketing education for the 21st century. Three goals support this mission: (1) create a community-wide awareness of the…

  19. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex,...

  20. Awarding Educational Credit for CETA Training: A Plan of Action.

    ERIC Educational Resources Information Center

    Sullins, W. Robert; And Others

    A project was conducted to determine problems or barriers prohibiting awarding credit for Comprehensive Employment and Training Act (CETA) training in Virginia. Potential solutions and strategies for their implementation were to be identified. A variety of methods were used to obtain information required to produce a Plan of Action that presents…

  1. Action Plan for the Development of Civic Morality

    ERIC Educational Resources Information Center

    Chinese Education and Society, 2006

    2006-01-01

    This paper discusses the action plan for the development of civic morality. Here, the importance, substance, ideology and policy principles guiding the development of civic morality is elaborated. In order to strengthen the development of civic morality, it is a must to adapt to the requirements of the developing situation; seize good…

  2. Creating a Global Agenda: Assessments, Solutions, and Action Plans.

    ERIC Educational Resources Information Center

    Didsbury, Howard F., Jr., Ed.

    Designed for educational policymakers and researchers, this volume on global issues is divided into four sections. The four essays in the first section, "Reducing the Nuclear Peril," offer a brief documentary survey and then present practical suggestions and action plans to reduce the nuclear threat. The eight papers in the second section,…

  3. Guide for Planning a High School Environmental Action Conference.

    ERIC Educational Resources Information Center

    Wanless, Angie, Comp.; And Others

    The purpose of this manual is to provide guidelines and suggestions for people organizing an environmental action conference for high school students. The format and planning suggestions are based on the methods used for a conference organized by the Wisconsin Center for Environmental Education in 1991. The bulk of the manual provides structure…

  4. Affirmative Action Plan. Access, Equity, Opportunity. Fifth Edition.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    The Affirmative Action Plan of the New York State Education Department is described in this document. First, a policy statement is provided by the New York State Education Department, committing the Department to the development of: (1) programmatic approaches to the elimination of all unjust exclusionary employment practices, policies, and…

  5. Evaluation criteria for communications-related corrective action plans

    SciTech Connect

    1997-02-01

    This document provides guidance and criteria for US Nuclear Regulatory Commission (NRC) personnel to use in evaluating corrective action plans for nuclear power plant communications. The document begins by describing the purpose, scope, and applicability of the evaluation criteria. Next, it presents background information concerning the communication process, root causes of communication errors, and development and implementation of corrective actions. The document then defines specific criteria for evaluating the effectiveness of the corrective action plan, interview protocols, and an observation protocol related to communication processes. This document is intended only as guidance. It is not intended to have the effect of a regulation, and it does not establish any binding requirements or interpretations of NRC regulations.

  6. Teaching Literacy as Rap at Southeast Community College.

    ERIC Educational Resources Information Center

    Sundeen, Jim

    2003-01-01

    Describes how the author became critically aware of the dynamics of literacy and race in a composition classroom. Introduces his students to rap music as a legitimate literacy and a type of literature in its own right. Describes the lesson plan he used in the project and explains some of the theory that inspired his classroom inquiry. (SG)

  7. Predicting Changes in Physical Activity among Adolescents: The Role of Self-Efficacy, Intention, Action Planning and Coping Planning

    ERIC Educational Resources Information Center

    Araujo-Soares, Vera; McIntyre, Teresa; Sniehotta, Falko F.

    2009-01-01

    This paper aims to test the direct predictors of the theory of planned behaviour (TPB), action planning and coping planning as predictors of changes in physical activity (PA) in 157 adolescents (mean age: 12). TPB measures, the Action Planning and Coping Planning Scales (APCPS) and the International Physical Activity Questionnaires were measured…

  8. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 536: AREA 3 RELEASE SITE, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2005-09-01

    CAU 536 consists of CAS 03-44-02, Steam Jenny Discharge, located in Area 3 of the NTS. The site was characterized in 2004 according to the approved CAIP and the site characterization results are reported in the CAU 536 CADD. The purpose of this Corrective Action Plan (CAP) is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 536 CADD.

  9. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    SciTech Connect

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action.

  10. Action Planning Mediates Guidance of Visual Attention from Working Memory.

    PubMed

    Feldmann-Wüstefeld, Tobias; Schubö, Anna

    2015-01-01

    Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM) content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing) and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton) was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles), thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences. PMID:26171241

  11. Affirmative Action Plans, January 1, 1994--December 31, 1994. Revision

    SciTech Connect

    Not Available

    1994-02-16

    This document is the Affirmative Action Plan for January 1, 1994 through December 31, 1994 for the Lawrence Berkeley Laboratory, University of California (``LBL`` or ``the Laboratory.``) This is an official document that will be presented upon request to the Office of Federal Contract Compliance Programs, US Department of Labor. The plan is prepared in accordance with the Executive Order 11246 and 41 CFR Section 60-1 et seq. covering equal employment opportunity and will be updated during the year, if appropriate. Analyses included in this volume as required by government regulations are based on statistical comparisons. All statistical comparisons involve the use of geographic areas and various sources of statistics. The geographic areas and sources of statistics used here are in compliance with the government regulations, as interpreted. The use of any geographic area or statistic does not indicate agreement that the geographic area is the most appropriate or that the statistic is the most relevant. The use of such geographic areas and statistics is intended to have no significance outside the context of this Affirmative Action Plan, although, of course, such statistics and geographic areas will be used in good faith with respect to this Affirmative Action Plan.

  12. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  13. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  14. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  15. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  16. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  17. German Rap Music in the Classroom.

    ERIC Educational Resources Information Center

    Schmidt, Johannes

    2003-01-01

    Provides background information on German rap artists and bands and discusses how to implement the music in various classroom situations at all levels. Highlights some of the available material on German rap music and provides information on how to locate rap texts, information, and other material via the Internet and other sources. (Author/VWL)

  18. Modification to the Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Volume 1, Text, Attachments 1--6. Final report

    SciTech Connect

    1989-01-01

    This document provides the modifications to the 1988 Remedial Action Plan (RAP) of the contaminated materials at the Monument Valley, Arizona, and Mexican Hat, Utah. The text detailing the modifications and attachments 1 through 6 are provided with this document. The RAP was developed to serve a two-fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents.

  19. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona. Text, Appendices A, B, and C: Final report

    SciTech Connect

    Not Available

    1989-08-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site near Tuba City, Arizona. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the Navajo Nation, the Hopi Tribe, US Bureau of Indian Affairs (BIA), and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE, the Navajo Nation, and the Hopi Tribe, and concurrence by NRC, becomes Appendix B of the Cooperative Agreement. Following the introduction, contents are as follows: Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 summarizes the plan for ensuring environmental, health, and safety protection for the surrounding community and the on-site workers. Section 6.0 presents a detailed listing of the responsibilities of the project participants. Section 7.0 describes the features of the long-term surveillance and maintenance plan. Section 8.0 presents the quality assurance aspects of the project. Section 9.0 documents the ongoing activities to keep the public informed and participating in the project.

  20. Commonwealth of the Northern Mariana Islands Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  1. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Text, Appendices A--C. Final report

    SciTech Connect

    1988-07-01

    This Remedial Action Plan (RAP) has been developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Appendices A,B, and C are provided as part of this document. Appendix A presents regulatory compliance issues, Appendix B provides details of the engineering design, and Appendix C presents the radiological support plan.

  2. Rap1 Activation Plays a Regulatory Role in Pancreatic Amylase Secretion*S⃞

    PubMed Central

    Sabbatini, Maria E.; Chen, Xuequn; Ernst, Stephen A.; Williams, John A.

    2008-01-01

    Rap1 is a member of the Ras superfamily of small GTP-binding proteins and is localized on pancreatic zymogen granules. The current study was designed to determine whether GTP-Rap1 is involved in the regulation of amylase secretion. Rap1A/B and the two Rap1 guanine nucleotide exchange factors, Epac1 and CalDAG-GEF III, were identified in mouse pancreatic acini. A fraction of both Rap1 and Epac1 colocalized with amylase in zymogen granules, but only Rap1 was integral to the zymogen granule membranes. Stimulation with cholecystokinin (CCK), carbachol, and vasoactive intestinal peptide all induced Rap1 activation, as did calcium ionophore A23187, phorbol ester, forskolin, 8-bromo-cyclic AMP, and the Epac-specific cAMP analog 8-pCPT-2′-O-Me-cAMP. The phospholipase C inhibitor U-73122 abolished carbachol- but not forskolin-induced Rap1 activation. Co-stimulation with carbachol and 8-pCPT-2′-O-Me-cAMP led to an additive effect on Rap1 activation, whereas a synergistic effect was seen on amylase release. Although the protein kinase A inhibitor H-89 abolished forskolin-stimulated CREB phosphorylation, it did not modify forskolin-induced GTP-Rap1 levels, excluding PKA participation. Overexpression of Rap1 GTPase-activating protein, which blocked Rap1 activation, reduced the effect of 8-bromo-cyclic AMP, 8-pCPT-2′-O-Me-cAMP, and vasoactive intestinal peptide on amylase release by 60% and reduced CCK- as well as carbachol-stimulated pancreatic amylase release by 40%. These findings indicate that GTP-Rap1 is required for pancreatic amylase release. Rap1 activation not only mediates the cAMP-evoked response via Epac1 but is also involved in CCK- and carbachol-induced amylase release, with their action most likely mediated by CalDAG-GEF III. PMID:18577515

  3. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  4. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    USGS Publications Warehouse

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  5. Information architecture: Standards adoption and retirement process service action plan

    SciTech Connect

    1997-03-01

    The purpose of this Service Action Plan is to announce, as well as provide, a high-level outline of a new Departmental process for the adoption and retirement of information technology standards. This process supports the implementation of a Department of Energy (DOE) Information Architecture. This plan was prepared with the Department of Energy information technology standards customers and stakeholders in mind. The process described in this plan will be serviced primarily by staff from the Office of the Deputy Assistant Secretary for Information Management with assistance from designated program and site Information Technology Standards Points of Contact. We welcome any comments regarding this new Departmental process and encourage the proposal of information technology standards for adoption or retirement.

  6. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation

  7. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    SciTech Connect

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the Corrective Action Unit No. 426, which includes the Cactus Spring Waste Trenches, located at the Tonopah Test Range. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action. The scope of this investigation will include drilling and collecting subsurface samples from within and below the trenches. Sampling locations will be biased toward the areas most likely to be contaminated. The Cactus Spring Waste Trenches Site is identified as one of three potential locations for buried, radioactively contaminated materials from the Double Tracks Test. This test was the first of four storage-transportation tests conducted in 1963 as part of Operation Roller Coaster. The experiment involved the use of live animals to assess the inhalation intake of a plutonium aerosol.

  8. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  9. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    SciTech Connect

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  10. Action Plan for updated Chapter 15 Accident Analysis in the SRS Production Reactor SAR

    SciTech Connect

    Hightower, N.T. III; Burnett, T.W.

    1989-11-15

    This report describes the Action Plan for the upgrade of the Chapter 15 Accident Analysis in the SRS Production Reactor SAR required for K-Restart. This Action Plan will be updated periodically to reflect task accomplishments and issue resolutions.

  11. Workshop on the preparation of climate change action plans. Workshop summary

    SciTech Connect

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  12. Planning perception and action for cognitive mobile manipulators

    NASA Astrophysics Data System (ADS)

    Gaschler, Andre; Nogina, Svetlana; Petrick, Ronald P. A.; Knoll, Alois

    2013-12-01

    We present a general approach to perception and manipulation planning for cognitive mobile manipulators. Rather than hard-coding single purpose robot applications, a robot should be able to reason about its basic skills in order to solve complex problems autonomously. Humans intuitively solve tasks in real-world scenarios by breaking down abstract problems into smaller sub-tasks and use heuristics based on their previous experience. We apply a similar idea for planning perception and manipulation to cognitive mobile robots. Our approach is based on contingent planning and run-time sensing, integrated in our knowledge of volumes" planning framework, called KVP. Using the general-purpose PKS planner, we model information-gathering actions at plan time that have multiple possible outcomes at run time. As a result, perception and sensing arise as necessary preconditions for manipulation, rather than being hard-coded as tasks themselves. We demonstrate the e ectiveness of our approach on two scenarios covering visual and force sensing on a real mobile manipulator.

  13. Action planning in sequential skills: relations to music performance.

    PubMed

    Keller, Peter E; Koch, Iring

    2008-02-01

    The hypothesis that planning music-like sequential actions involves anticipating their auditory effects was investigated in a series of experiments. Participants with varying levels of musical experience responded to each of four colour-patch stimuli by producing a unique sequence of three taps on three vertically aligned keys. Each tap triggered a tone in most experimental conditions. Response--effect (key-to-tone) mapping was either compatible--taps on the top, middle, and bottom keys triggered high, medium, and low pitched tones, respectively--or incompatible--key-to-tone mapping was scrambled, reversed, or neutral (taps on different keys triggered the same tone). The results suggest that action planning was faster with compatible than with incompatible mappings (and faster than with no tones). Furthermore, the size of this compatibility effect grew with increasing musical experience, which suggests that improvements in auditory imagery ability that typically accompany musical training may augment the role of anticipatory auditory-effect representations during planning. PMID:17853237

  14. Corrective Action Plan for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada

    SciTech Connect

    Bechtel Nevada

    1998-09-30

    This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that the landfill cells were used for solid waste disposal, including disposal of UXO.

  15. Practice in Planning and Planning in Practice: Re-Assessing and Clarifying Action Research in a Multi-National Context

    ERIC Educational Resources Information Center

    Kusch, Jim; Rebolledo, Geisha; Ryan, Charly

    2005-01-01

    This paper responds to a call seeking presenters for an action-research event for elementary-school science teachers in Venezuela. The authors planned on the assumption that the participants would wish to leave with plans for introducing action-research approaches into their practice. In previous writing on action research, the various protocols…

  16. Planning for primary health care: the case of the Sierra Leone National Action Plan.

    PubMed

    Decosas, J

    1990-01-01

    The National Action Plan for Primary Health Care, a planning document of the Sierra Leonean Ministry of Health for the restructuring of the country's rural health services, is analyzed in its social, economic, and historical context. It appears to be an attempt of the national government to gain control over the highly devolved health care delivery system, but the state has neither the political will nor the power to achieve this goal. The utility of the document is therefore in doubt, which raises two important questions: Whose interests does this plan serve, and at whose cost? PMID:2307554

  17. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  18. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  19. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 2 2013-07-01 2013-07-01 false What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  20. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  1. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 2 2012-07-01 2012-07-01 false What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  2. Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children

    ERIC Educational Resources Information Center

    Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert

    2013-01-01

    The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…

  3. Flexible and Inexpensive: Improving Learning Transfer and Program Evaluation through Participant Action Plans

    ERIC Educational Resources Information Center

    Cowan, Chris A.; Goldman, Ellen F.; Hook, Melissa

    2010-01-01

    Action plans have been shown to improve transfer of learning and have proven an effective tool in training evaluation. This study describes how action planning was simply and successfully adapted to a preexisting curriculum with few additional resources. The decision to use participant action planning, the administration of it, and the…

  4. Report of the Tape Recorder Action Plan Committee, 21 March 1972

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A NASA/AF Tape Recorder Action Plan Committee was formed in January 1972 to investigate tape recorder problems and to recommend an action plan to NASA management. The committee collected data on tape recorder failure history, pinpointed problem areas, discussed needed technical and management changes, and proposed an action plan for the recommended approaches.

  5. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 4 2014-07-01 2014-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action...

  6. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action...

  7. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action...

  8. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 4 2012-07-01 2012-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action...

  9. Rap Music: An Education with a Beat from the Street.

    ERIC Educational Resources Information Center

    Powell, Catherine Tabb

    1991-01-01

    Examines rap music's origins as street music and poetry in the early 1970s and as an expression of Black youth experience. Discusses rap groups, women and Whites in rap, Christian rap, copyright disputes, and distribution difficulties. Rap is an informal educational medium that affects adolescents' values and attitudes. (JB)

  10. Rap-Music Attitude and Perception Scale: A Validation Study

    ERIC Educational Resources Information Center

    Tyson, Edgar H.

    2006-01-01

    Objective: This study tests the validity of the Rap-music Attitude and Perception (RAP) Scale, a 1-page, 24-item measure of a person's thoughts and feelings surrounding the effects and content of rap music. The RAP was designed as a rapid assessment instrument for youth programs and practitioners using rap music and hip hop culture in their work…

  11. The scaup conservation action plan: working toward coherence

    USGS Publications Warehouse

    Austin, Jane E.

    2010-01-01

    The last in a series of three workshops to develop a decision framework for the scaup conservation action plan was conducted in September 2009. Fifteen waterfowl biologists and managers met in Memphis, Tennessee at the Ducks Unlimited Headquarters to review and refine the decision statement, objectives, and prototype model for the continental scaup population, with a special focus on vital rate parameters that are affected during migration and winter. In a significant step toward coherence, the participants also developed models for incorporating human dimensions – hunters – into the decision framework, and to link the population of diving duck hunters with the continental scaup population.

  12. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    SciTech Connect

    Not Available

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  13. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Not Available

    1992-10-01

    The Uranium Mill Tallings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1 (Chapter 3, paragraph 2). The UMTRA EPIP covers the time period of November 9, 1992, through November 8, 1993. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  14. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  15. The Representation of Action Plans in Long Term Memory

    NASA Technical Reports Server (NTRS)

    Fussfeld, G. N.; Koenig, W.; Karis, D.

    1984-01-01

    A sequence of experiments conducted on a two hand chord typewriter, to compare the efficiency of different coding principles employed to associate letters with their chord productions is described. This keyboard represents an effort to identify effective alternatives to the existing typewriter. It consists of two seperate 5-key panels (one for each hand), and letters are entered by typing chords composed of one to five fingers. Each panel is capable of producing the full alphabet. One group of experiments was designed to separate between perceptual and motor factors in the acivation of single letter chords. The results underline the importance of perceptual factors in the activation of motor plans. The complexity of the patterns employed to represent letters was shown to account for 50 percent of variance in the typing speeds of single letters. The theoretical implications of these results are discussed in relation to a vision based theory of action plans.

  16. Planning an Action: A Developmental Progression in Tool Use

    PubMed Central

    Keen, Rachel; Lee, Mei-Hua; Adolph, Karen

    2014-01-01

    How children pick up a tool reveals their ability to plan an action with the end goal in mind. When presented with a spoon whose handle points away from their dominant hand, children between infancy and 8 years of age progress from using an awkward ulnar grip that causes food to spill from the spoon to consistently using a radial grip. At 4 years of age children’s grip strategies are highly variable, including the awkward grips of infancy and use of the non-dominant hand, but they also employ adult-like grips never seen in infancy. By 8 years of age the infantile ulnar grip has completely disappeared and is replaced by more mature and effective grips that indicates better planning for the end goal. PMID:24954996

  17. Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    SciTech Connect

    T. M. Fitzmaurice

    2000-05-01

    This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

  18. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    ERIC Educational Resources Information Center

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  19. 42 CFR 430.16 - Timing and notice of action on State plan material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Timing and notice of action on State plan material... State Plans § 430.16 Timing and notice of action on State plan material. (a) Timing. (1) A State plan or... of any additional information it needs in order to make a final determination. (2) If CMS...

  20. 42 CFR 430.16 - Timing and notice of action on State plan material.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Timing and notice of action on State plan material... State Plans § 430.16 Timing and notice of action on State plan material. (a) Timing. (1) A State plan or... of any additional information it needs in order to make a final determination. (2) If CMS...

  1. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2009-03-31

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12

  2. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  3. The limits of scientific planning: Doxiadis and the Tehran Action Plan.

    PubMed

    Madanipour, Ali

    2010-01-01

    Tehran after the Second World War experienced a modernization drive and rapid population growth. In 1972, the Greek planner, Constantinos Doxiadis, who had already undertaken major housing and planning projects in Iran, was invited to prepare an action plan for the city, to guide the future investment for easing the city's problems. Doxiadis saw cities as nightmares, but advocated that a holistic scientific analysis and a naturalist approach to urban growth management could address their problems. In applying his ideas to Tehran, however, the limits of his ideas of scientific planning became evident, not only through contextual pressures, such as lack of time and data, but also through the planning consultant's approach, in which commercial considerations and the application of readymade solutions could shape the outcome. Rather than working with the context, Doxiadis followed the modernist tenet of breaking with the past, proposing the creation of West Tehran, an alternative to the city where all future growth should take place on a utopian basis. The radical nature of his proposals, his death, and a turbulent revolution aborted the impact of his action plan on Tehran, while faith in modernist scientific planning was widely being abandoned. PMID:20857604

  4. National action plan to combat multidrug-resistant tuberculosis.

    PubMed

    1992-06-19

    At no time in recent history has tuberculosis (TB) been as great a concern as it is today. TB cases are on the increase, and the most serious aspect of the problem is the recent occurrence of outbreaks of multidrug-resistant (MDR) TB, which pose an urgent public health problem and require rapid intervention. A Task Force composed of representatives of many federal agencies has developed a National Action Plan for addressing this problem. The Task Force identified a number of objectives to be met if MDR-TB is to be successfully combatted. These objectives fall under the categories of a) surveillance and epidemiology--determining the magnitude and nature of the problem; b) laboratory diagnosis--improving the rapidity, sensitivity, and reliability of diagnostic methods for MDR-TB; c) patient management--effectively managing patients who have MDR-TB and preventing patients with drug-susceptible TB from developing drug-resistant disease; d) screening and preventive therapy--identifying persons who are infected with or at risk of developing MDR-TB and preventing them from developing clinically active TB; e) infection control--minimizing the risk of transmission of MDR-TB to patients, workers, and others in institutional settings; f) outbreak control; g) program evaluation--ensuring that TB programs are effective in managing patients and preventing MDR-TB; h) information dissemination/training and education; and i) research to provide new, more effective tools with which to combat MDR-TB. The Action Plan lays out a series of activities to be undertaken at the national level. For each category, the Plan presents statements of problems to be overcome, followed by a summary of the objective to be achieved and steps to be carried out. For each implementation step, responsibility is assigned to the appropriate organization and start-up dates are listed. PMID:1640920

  5. Rap Music in School Counseling Based on Don Elligan's Rap Therapy

    ERIC Educational Resources Information Center

    Gonzalez, Tiphanie; Hayes, B. Grant

    2009-01-01

    In 2000, Don Elligan introduced Rap Therapy as a psychotherapeutic intervention for working with at-risk youths, primarily African American males whose identities were highly influenced by rap music. Rap music can engage a population of youth who often enter counseling apprehensively (Elligan 2000, 2004; Tillie-Allen, 2005). This article reviews…

  6. Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site

    SciTech Connect

    DOE /NV

    1998-11-01

    This Corrective Action Investigation Plan (CAIP) describes the US Department of Energy's (DOE's) continued environmental investigation of the subsurface Project Shoal Area (PSA) Corrective Action Unit (CAU) 447. The PSA is located in the Sand Springs Mountains in Churchill County, Nevada, about 48 kilometers (km) (30 miles [mi]) southeast of Fallon, Nevada. Project Shoal was part of the Vela Uniform Program which was conducted to improve the US' ability to detect, identify, and locate underground nuclear detonations. The test consisted of detonating a 12-kiloton nuclear device deep underground in granitic rock to determine whether seismic waves produced by an underground nuclear test could be differentiated from seismic waves produced by a naturally occurring earthquake. The test was a joint effort conducted by the US Atomic Energy Commission (AEC) and the US Department of Defense (DoD) in October 1963 (AEC, 1964).

  7. North Slope (Wahluke Slope) expedited response action cleanup plan

    SciTech Connect

    Not Available

    1994-02-01

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

  8. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    SciTech Connect

    DOE /NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  9. [International and Israeli physicians' health--information and action plan].

    PubMed

    Reis, Shmuel; Sayag, Shlomit; Karkabi, Khalid; Alroi, Gideon

    2008-03-01

    Physician health is a matter of interest for patients' physicians and their teams, managers and policy-makers. It has an impact on public health, physician impairment, patient safety, resource allocation and malpractice litigation. International medical literature, unlike Israel publications, is extensively preoccupied with the domain. Based on 2 MD thesis dissertations, Ministry of Health data and a literature search, the present review addresses many issues. It deals with: physicians' physical and mental health internationally and in Israel, prevention and health promotion, burn-out, the professional lifespan and career, health services utilization, legal and administrative aspects, boundaries, physicians' characteristics and vulnerability, interpersonal relations, care provided by physicians, physicians as patients and finally the impaired physician. International recommendations as well as a proposal for a local action plan are presented. PMID:18488866

  10. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 4 2011-07-01 2011-07-01 false Affirmative action plans or programs under State or local law. 1608.7 Section 1608.7 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or...

  11. 75 FR 60759 - Enforcement Action Plan for Promotion and Advertising Restrictions; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ...The Food and Drug Administration (FDA) is announcing the availability of a document entitled ``Enforcement Action Plan for Promotion and Advertising Restrictions'' (Enforcement Action Plan), which describes FDA's plan to enforce the restrictions on promotion and advertising of menthol and other cigarettes to youth and other requirements relating to tobacco product promotion and advertising......

  12. A School Action Plan with Stakeholder Involvement: A Case Study of One Elementary School

    ERIC Educational Resources Information Center

    Getty, Jacob J., Jr.

    2011-01-01

    This case study focused on a school action plan, using a planning and implementation process that focused on improving stakeholder involvement and responsibility for student reading achievement at Eisenberg Elementary School. This study examined the impact of the school action process on the development of a new plan compared to other traditional…

  13. Cool Campus! A How-To Guide for College and University Climate Action Planning

    ERIC Educational Resources Information Center

    Simpson, Walter

    2009-01-01

    While a number of excellent campus climate planning resources are available, this guide attempts to fill a gap by providing an abundance of "how-to" information. The goal of the guide is to assist climate action planning teams at schools that are well versed in campus climate issues and well along in the CAP (Climate Action Planning) process as…

  14. Group Action Planning As a Support Strategy for Hispanic Families: Parent and Professional Perspectives.

    ERIC Educational Resources Information Center

    Blue-Banning, Martha J.; Turnbull, Ann P.; Pereira, Lourdes

    2000-01-01

    Thirty-eight Hispanic parents of children (ages 6-26) with developmental disabilities and 22 professionals participated in focus group interviews on group action planning. Both constituency groups identified advantages and disadvantages to group action planning. Parents indicated this type of planning process could increased the quality and…

  15. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  16. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 8 2013-10-01 2013-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  17. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 8 2012-10-01 2012-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  18. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 8 2011-10-01 2011-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  19. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 8 2014-10-01 2014-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  20. Water Planning and Climate Change: Actionable Intelligence Yet?

    NASA Astrophysics Data System (ADS)

    Milly, P.

    2008-05-01

    alternative. What is to be done? Is climate-change information of sufficient strength to justify making decisions that differ from those that would be optimal under stationarity? I.e., does climate science provide "actionable intelligence" to water planners? A conservative approach to planning in the presence of climate change would begin with stationarity as a base and then superpose, with quantitative estimates of uncertainties, those model-projected changes that appear to be qualitatively robust. The current state of science suggests that the following changes could be considered robust: (1) reduction in the fraction of precipitation falling as snow and earlier seasonal melting of snow, with consequent seasonal redistribution of runoff and streamflow; (2) gradual sea-level rise with heightened risk of encroachment of saline water into coastal surface- and ground-water-supply sources; and (3) global redistribution of precipitation and resultant runoff, with regional focal points ("hot spots") of desiccation and moistening. Even considering the attendant uncertainties, the available information about these changes can significantly affect the cost-benefit-risk tradeoffs of existing and prospective water projects and, therefore, can rationally inform decisions about future courses of action or inaction.

  1. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    USDOE /NV

    1999-05-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document.

  2. Smoking cessation in cardiac patients: the influence of action plans, coping plans and self-efficacy on quitting smoking.

    PubMed

    de Hoog, Natascha; Bolman, Catherine; Berndt, Nadine; Kers, Esther; Mudde, Aart; de Vries, Hein; Lechner, Lilian

    2016-06-01

    Smoking cessation is the most effective action for cardiac patients who smoke to improve their prognosis, yet more than one-half of cardiac patients continue to smoke after hospital admission. This study examined the influence of action plans, coping plans and self-efficacy on intention to quit and smoking cessation in cardiac patients. Cardiac patients completed a baseline questionnaire (N = 245) assessing demographic characteristics, smoking behavior, intention, self-efficacy, relapse self-efficacy and action and coping plans. Six months later (N = 184) continued abstinence from smoking was assessed. Self-efficacy predicted intention to quit smoking and was an indirect predictor of continued abstinence, through intention. Intention to quit smoking and making action plans both directly influenced continued abstinence. Future interventions to facilitate smoking cessation in cardiac patients should put strong emphasis on enhancing self-efficacy and on making specific action plans to increase the likelihood of smoking cessation. PMID:26827369

  3. Unwrapping Rap: A Literacy of Lived Experience.

    ERIC Educational Resources Information Center

    Brown, Stephen G.

    The adversarial forces of governmental censorship, freedom of expression, and capitalistic appropriation are engaged in an acrimonious debate over "Gangsta' Rap" that is being played out in the public spaces of popular culture. However, as a literacy of lived experience, Gangsta' Rap warrants critical investigation. Many postmodern theorists have…

  4. A Three Step Plan for Implementing an Affirmative Action Program

    ERIC Educational Resources Information Center

    Hilaael, Timothy M.

    1976-01-01

    (1) Centralize organizational responsibility for affirmative action. (2) Conduct an organizational audit related to the Equal Employment Opportunity Act. (3) Implement affirmative action as an administrative responsibility. (Author)

  5. The sequential encoding of competing action goals involves dynamic restructuring of motor plans in working memory.

    PubMed

    Gallivan, Jason P; Bowman, Natasha A R; Chapman, Craig S; Wolpert, Daniel M; Flanagan, J Randall

    2016-06-01

    Recent neural and behavioral findings provide support for the influential idea that in situations in which multiple action options are presented simultaneously, we prepare action plans for each competing option before deciding between and executing one of those plans. However, in natural, everyday environments, our available action options frequently change from one moment to the next, and there is often uncertainty as to whether additional options will become available before having to select a particular course of action. Here, with the use of a target-directed reaching task, we show that in this situation, the brain specifies a competing action for each new, sequentially presented potential target and that recently formed action plans can be revisited and updated so as to conform with separate, more newly developed, plans. These findings indicate that the brain forms labile motor plans for sequentially arising target options that can be flexibly restructured to accommodate new motor plans. PMID:27030738

  6. Corrective Action Investigation plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfield, Nevada Test Site, Nevada, March 1999

    SciTech Connect

    ITLV

    1999-03-01

    The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

  7. Corrective Action Investigation Plan for Corrective Action Unit 500: Test Cell A Septic System, Nevada Test Site, Nevada

    SciTech Connect

    IT Las Vegas

    1999-01-27

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s), and may include solid waste management units, individual disposal sites, or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP will be used in conjunction with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998c), hereafter referred to as the Leachfield Work Plan. Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. This CAIP contains CAU-specific information including a facility description, environmental sample collection objectives, and the criteria for conducting site investigation activities at CAU 500. This CAIP addresses one of three leachfield systems associated with Test Cell A, which is located in Area 25 at the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (see Leachfield Work Plan Figure 1-1). Corrective Action Unit 500 is comprised of the Test Cell A Septic System (CAS 25-04-05) and the associated leachfield system presented in Figure 1-1 (FFACO, 1996).

  8. Nantucket, Ma. Climate Protection Action Plan: A Public Outreach Strategy

    NASA Astrophysics Data System (ADS)

    Petrik, C.; Stephenson, A.; Petsch, S.

    2009-12-01

    As communities and municipalities gain a better understanding of climate change, they are exploring the ways in which to work towards adaptation and mitigation. One strategy that the Island of Nantucket, Massachusetts turned toward is the drafting of a Climate Protection Action Plan (CPAP). The CPAP was developed during the summer of 2009 to meet three goals: (1) assist the Town of Nantucket in creating a framework to help them reduce CO2 emissions; (2) educate the municipality and community in techniques that promote energy efficiency and sustainability on the island; and (3) document past, present and future approaches adopted by the Town towards emissions reduction and energy sustainability. In particular, this project focused on using local strengths and natural resources identified by island stakeholders that may help the island to mitigate carbon emissions and adapt to climate change.. Drafting the CPAP provided community members and politicians with an opportunity to become better educated in the science of climate change and to learn how climate change will affect their community. On the island of Nantucket, leaders in the religious, civic, and political communities were brought into a conversation about how each group could contribute to reducing greenhouse gas emissions. A geosciences graduate student was brought into the CPAP team as a climate fellow to facilitate this conversation. This provided the foundation for stakeholder recommendations incorporated into the CPAP. This capacity-building model served as an effective way to create an informal learning environment about climate change that allowed members of the island community to directly participate in developing their locally appropriate climate protection strategy. The draft CPAP developed through this study and presented to the Town of Nantucket comprises assessments and recommendations in public research and education; building and energy efficiency; transportation; renewable energy; and carbon

  9. Aquatic ecosystem condition: The Fraser River Action Plan approach

    SciTech Connect

    Tuominen, T.; Raymond, B.; Sekela, M.; Reynoldson, T.

    1995-12-31

    A major goal of the Canadian government`s Fraser River Action Plan (FRAP) is to clean up existing pollution problems in the Fraser River Basin. In support of this goal, the Environmental Quality Assessment Program is assessing the quality of the aquatic environment, particularly with respect to contaminants. The program, conducted from 1993 to 1998, is to establish a baseline condition for the aquatic ecosystem against which the success of clean up efforts can be measured. The FRAP approach is to use a combination of contaminant exposure or stressor indicators and organism ``effects`` indicators. The focus is on three components of the aquatic ecosystem: (1) bed sediment, (2) resident fish and (3) benthos. A priority for the program is integration of the three components, wherever possible. Bed sediments, as indicators of contaminant stress, are sampled at fourteen reaches in the river and major tributaries. Two species of resident fish are sampled and analyzed for condition factors, enzyme induction, histopathology and contaminant content at each of nine sites in the basin. The resident fish data are providing a measure of contaminant exposure and effect. Organism community effects will be assessed by a study which is classifying approximately 200 tributary and mainstem sites based on benthos community structure. For the first time in a large river system in Canada, this benthos study uses a multivariate approach which relates a suite of chemical and physical characteristics to benthos community structure.

  10. Process safety management and interim or remedial action plans

    SciTech Connect

    Boss, M.J.; Henney, D.A.; Heitzman, V.K.; Day, D.W.

    1996-12-31

    Remedial Actions, including Interim Remedial Activities, often require the use of treatment facilities or stabilization techniques using on-site chemical processes. As such, the 29 CFR 1910.119 Process Safety Management (PSM) of Highly Hazardous Chemicals (PSM Standard) and the USEPA regulations for Risk Management Planning require that these chemicals and their attendant potential hazards be identified. A Hazard and Operation (HAZOP) study, Failure Mode and Effect Analysis (FMEA), Fault Tree Analysis, or equivalent graphic presentation of processes must be completed. These studies form a segment of the Process Hazard Analysis (PHA). HAZOP addresses each system and each element of a system that could deviate from normal operations and thus cause a hazard. A full assessment of each process is produced by looking at the hazards, consequences, causes and personnel protection needed. Many variables must be considered when choosing the appropriate PHA technique including the size of the plant, the number of processes, the types of processes, and the types of chemicals used. A mixture of these techniques may be required to adequately transmit information about the process being evaluated.

  11. 36 CFR 72.52 - Recovery Action Program grant applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... instead of doing the work within the community's own planning agencies. (4) Applications for RAP grants need a full 60 day A-95 clearinghouse review. Clearinghouse comments for RAP grants must then be submitted to NPS. Final RAP's also must be submitted to clearinghouses, in accordance with OMB Circular A-95....

  12. 36 CFR 72.52 - Recovery Action Program grant applications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... instead of doing the work within the community's own planning agencies. (4) Applications for RAP grants need a full 60 day A-95 clearinghouse review. Clearinghouse comments for RAP grants must then be submitted to NPS. Final RAP's also must be submitted to clearinghouses, in accordance with OMB Circular A-95....

  13. 36 CFR 72.52 - Recovery Action Program grant applications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... instead of doing the work within the community's own planning agencies. (4) Applications for RAP grants need a full 60 day A-95 clearinghouse review. Clearinghouse comments for RAP grants must then be submitted to NPS. Final RAP's also must be submitted to clearinghouses, in accordance with OMB Circular A-95....

  14. 36 CFR 72.52 - Recovery Action Program grant applications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... instead of doing the work within the community's own planning agencies. (4) Applications for RAP grants need a full 60 day A-95 clearinghouse review. Clearinghouse comments for RAP grants must then be submitted to NPS. Final RAP's also must be submitted to clearinghouses, in accordance with OMB Circular A-95....

  15. 36 CFR 72.52 - Recovery Action Program grant applications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... instead of doing the work within the community's own planning agencies. (4) Applications for RAP grants need a full 60 day A-95 clearinghouse review. Clearinghouse comments for RAP grants must then be submitted to NPS. Final RAP's also must be submitted to clearinghouses, in accordance with OMB Circular A-95....

  16. The Role of Cue-Response Mapping in Motorvisual Impairment and Facilitation: Evidence for Different Roles of Action Planning and Action Control in Motorvisual Dual-Task Priming

    ERIC Educational Resources Information Center

    Thomaschke, Roland; Hopkins, Brian; Miall, R. Christopher

    2012-01-01

    Previous research has shown that actions impair the visual perception of categorically action-consistent stimuli. On the other hand, actions can also facilitate the perception of spatially action-consistent stimuli. We suggest that motorvisual impairment is due to action planning processes, while motorvisual facilitation is due to action control…

  17. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    SciTech Connect

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  18. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-04-01

    6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005).

  19. NFE--Planning and Organizing for Action. Courier No. 27.

    ERIC Educational Resources Information Center

    ASPBAE Courier Service, 1983

    1983-01-01

    This issue contains six articles, reports, and essays on planning and organizing nonformal education in the Asian-South Pacific area. A chapter reprinted from "Planning Nonformal Education" discusses the need for planning, past efforts, and five steps in a strategy suggested for planning locally-oriented and target-specific nonformal educational…

  20. Action Mapping: A Planning Tool for Change. HSLA Monograph.

    ERIC Educational Resources Information Center

    Matsui, Bruce

    Future leaders will have to rely upon skills that are far different from those used in the past. Action mapping serves as a meta-process for moving schools toward desired ends; it calls upon school leaders to move into action, to reflect upon such actions, and to collect stories for future reflections. This process could be helpful to a school…

  1. Gathering Strength: Canada's Aboriginal Action Plan. A Progress Report = Rassembler nos forces: Le plan d'action du Canada pour les questions autochtones. Rapport d'etape.

    ERIC Educational Resources Information Center

    Department of Indian Affairs and Northern Development, Ottawa (Ontario).

    Gathering Strength is an integrated government-wide plan to address the key challenges facing Canada's Aboriginal people. Following an initial section on reconciliation of historic grievances, this report describes initiatives in the four areas addressed by the action plan: (1) partnerships (all schools received public awareness materials;…

  2. Toward a Theoretical Framework for Understanding the Relationship between Situated Action and Planned Action Models of Behavior in Information Retrieval Contexts: Contributions from Phenomenology.

    ERIC Educational Resources Information Center

    Ng, Kwong Bor

    2002-01-01

    Discussion of human-computer interaction and planned action focuses on the belief that it is impossible to consider an action without an a priori plan, even according to the phenomenological position taken for granted by the situated action theory. Reports results of a quasi-experiment that focused on plan deviation within an information seeking…

  3. The small GTPase Rap1b negatively regulates neutrophil chemotaxis and transcellular diapedesis by inhibiting Akt activation

    PubMed Central

    Kumar, Sachin; Xu, Juying; Kumar, Rupali Sani; Lakshmikanthan, Sribalaji; Kapur, Reuben; Kofron, Matthew; Chrzanowska-Wodnicka, Magdalena

    2014-01-01

    Neutrophils are the first line of cellular defense in response to infections and inflammatory injuries. However, neutrophil activation and accumulation into tissues trigger tissue damage due to release of a plethora of toxic oxidants and proteases, a cause of acute lung injury (ALI). Despite its clinical importance, the molecular regulation of neutrophil migration is poorly understood. The small GTPase Rap1b is generally viewed as a positive regulator of immune cell functions by controlling bidirectional integrin signaling. However, we found that Rap1b-deficient mice exhibited enhanced neutrophil recruitment to inflamed lungs and enhanced susceptibility to endotoxin shock. Unexpectedly, Rap1b deficiency promoted the transcellular route of diapedesis through endothelial cell. Increased transcellular migration of Rap1b-deficient neutrophils in vitro was selectively mediated by enhanced PI3K-Akt activation and invadopodia-like protrusions. Akt inhibition in vivo suppressed excessive Rap1b-deficient neutrophil migration and associated endotoxin shock. The inhibitory action of Rap1b on PI3K signaling may be mediated by activation of phosphatase SHP-1. Thus, this study reveals an unexpected role for Rap1b as a key suppressor of neutrophil migration and lung inflammation. PMID:25092872

  4. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    SciTech Connect

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  5. 23 CFR Appendix B to Subpart D of... - Sample Corrective Action Plan

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Sample Corrective Action Plan B Appendix B to Subpart D... EXTERNAL PROGRAMS Construction Contract Equal Opportunity Compliance Procedures Pt. 230, Subpt. D, App. B Appendix B to Subpart D of Part 230—Sample Corrective Action Plan Deficiency 1: Sources likely to...

  6. Action Planning in Typically and Atypically Developing Children (Unilateral Cerebral Palsy)

    ERIC Educational Resources Information Center

    Craje, Celine; Aarts, Pauline; Nijhuis-van der Sanden, Maria; Steenbergen, Bert

    2010-01-01

    In the present study, we investigated the development of action planning in children with unilateral Cerebral Palsy (CP, aged 3-6 years, n = 24) and an age matched control group. To investigate action planning, participants performed a sequential movement task. They had to grasp an object (a wooden play sword) and place the sword in a hole in a…

  7. How You Move Is What You See: Action Planning Biases Selection in Visual Search

    ERIC Educational Resources Information Center

    Wykowska, Agnieszka; Schubo, Anna; Hommel, Bernhard

    2009-01-01

    Three experiments investigated the impact of planning and preparing a manual grasping or pointing movement on feature detection in a visual search task. The authors hypothesized that action planning may prime perceptual dimensions that provide information for the open parameters of that action. Indeed, preparing for grasping facilitated detection…

  8. 40 CFR 77.4 - Administrator's action on proposed offset plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Administrator's action on proposed offset plans. 77.4 Section 77.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) EXCESS EMISSIONS § 77.4 Administrator's action on proposed offset plans....

  9. A Strategic Action Plan for Advancing Math and Science Education in New Mexico 2007-2010

    ERIC Educational Resources Information Center

    New Mexico Public Education Department, 2007

    2007-01-01

    This Strategic Action Plan for Advancing Math and Science Education is an initial outline of strategies, actions, measures of progress, resources needed, timelines, and responsible parties. The Plan focuses on these three main goals: (1) increasing student interest, participation, and achievement in math and science; (2) raising public support and…

  10. Using Action Plans to Support Communication Programming for Children Who Are Deafblind

    ERIC Educational Resources Information Center

    Bruce, Susan M.

    2008-01-01

    The author describes the use of action plans to support 2 teachers' post-in-service implementation of communication strategies with 3 children who are deafblind. In the action plans, the teachers recorded changes in thinking and instructional practices under the 4 aspects of communication: form, function, content, and context. They also recorded…

  11. 24 CFR 248.233 - Approval of a plan of action that includes incentives.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING ACT AND OTHER AUTHORITIES PREPAYMENT OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income Preservation Act of 1987 § 248.233 Approval of a plan of action...— (1) The housing will be retained as housing affordable for very low income families,...

  12. 23 CFR Appendix B to Subpart D of... - Sample Corrective Action Plan

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... EXTERNAL PROGRAMS Construction Contract Equal Opportunity Compliance Procedures Pt. 230, Subpt. D, App. B Appendix B to Subpart D of Part 230—Sample Corrective Action Plan Deficiency 1: Sources likely to yield... 23 Highways 1 2011-04-01 2011-04-01 false Sample Corrective Action Plan B Appendix B to Subpart...

  13. Action planning in typically and atypically developing children (unilateral cerebral palsy).

    PubMed

    Crajé, Céline; Aarts, Pauline; Nijhuis-van der Sanden, Maria; Steenbergen, Bert

    2010-01-01

    In the present study, we investigated the development of action planning in children with unilateral Cerebral Palsy (CP, aged 3-6 years, n=24) and an age matched control group. To investigate action planning, participants performed a sequential movement task. They had to grasp an object (a wooden play sword) and place the sword in a hole in a wooden block. Our main dependent variable was the grip type that participants used, i.e., did they adapt their initial grip choice such that they would reach a comfortable posture at the end of the action? This end-state comfort effect has been abundantly shown in research on action planning, and is taken as evidence for anticipatory planning. The first aim of the study was to investigate the development of action planning in the unilateral CP group and the control group. Our hypothesis was that action planning improves with age in the control group, but not in the unilateral CP group. The results showed that planning was impaired in the unilateral CP group compared with the control group. Consistent with our hypothesis, we found an age effect in the control group, but not in the unilateral CP group. In the control group 5 and 6 years olds showed more anticipatory planning compared with the 3 and 4 years olds. The second aim of this study was to examine whether an intervention for children with unilateral CP (i.e., constrained induced movement therapy combined with bimanual training) affected action planning. The children with unilateral CP were therefore measured on the experimental task before and after an 8-week intervention period. The results showed that planning improved after the intervention. This finding suggests that action planning ability in young children with unilateral CP may be sensitive to improvement. These findings are discussed within the context of typical and atypical development of action planning and further guidelines for intervention in children with unilateral CP are given. PMID:20451346

  14. Perspectives that influence action plans for chronic obstructive pulmonary disease

    PubMed Central

    Costi, S; Brooks, D; Goldstein, RS

    2006-01-01

    BACKGROUND: Prompt treatment of acute exacerbations (AEs) in chronic obstructive pulmonary disease (COPD) improves quality of life and reduces the use of health care resources. Although patient self-management through an individualized action plan (AP) can help with early initiation of therapy, its use is critically dependent on the patient recognizing the features of an exacerbation. OBJECTIVE: To describe COPD patients’ experiences with AEs, as well as health care professionals’ (HCPs’) attitudes toward the provision of an AP as part of self-management education. METHODS: Thirty-two patients with moderate to severe COPD who recently experienced at least one AE, and 22 HCPs with experience in the management of COPD, were interviewed. RESULTS: The most common symptoms and signs associated with an AE were difficulty breathing (84%), fatigue (81%), cold symptoms (59%), changes in sputum colour (53%) or amount (47%), and cough (44%). The main precipitants identified were environmental triggers (47%), infective agents (31%), excessive activities (25%), emotional factors (16%) and changes in medications (9%). Strategies for dyspnea relief included increasing medications (72%), resting (56%), avoiding exposure to environmental triggers (41%) and performing breathing exercises (31%). Patients supported the use of an AP and recommended that it be individualized for symptoms and triggers, and that it should also include strategies for addressing anxiety and depression. HCPs also supported the use of an individualized AP and recommended that it be regularly revisited, depending on the patient’s disease severity. CONCLUSIONS: Patients’ experiences with AEs do not always conform to a standard medical definition. Therefore, an understanding of their experience is of value in the design of an individualized AP. HCPs support the use of an AP that emphasizes self-management of exacerbations as well as general COPD management. PMID:17036089

  15. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    SciTech Connect

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  16. Action Research to Support the Sustainability of Strategic Planning

    ERIC Educational Resources Information Center

    Antheil, Jane H.; Spinelli, Stephen, Jr.

    2011-01-01

    This article suggests that developing a strategic plan, even through a highly participative and data-driven process, is not sufficient to sustain change if implementation of the plan is not monitored as an organizational change event. To the degree that a strategic plan is institutionally transformative, monitoring change during implementation…

  17. M.A.P.S.: Mesa Action Planning System.

    ERIC Educational Resources Information Center

    Larson, Elizabeth J. Hunt

    This report describes implementation of a districtwide planning model in the Mesa, Arizona, Public Schools. Figures illustrate planning processes throughout the report. Intended as an implementive framework, the planning system's purposes are to assist decision making about resource allocation, program direction, progress measurement, and district…

  18. Shaping the College Curriculum: Academic Plans in Action.

    ERIC Educational Resources Information Center

    Stark, Joan S.; Lattuca, Lisa R.

    This book proposes a broad view of the college curriculum, suggesting that it be defined as an "academic plan." The plan included decisions about what, why, and how students learn; ways to determine whether students have learned what they are supposed to learn; and methods of using this information to improve the plan. Taking both a macro and a…

  19. Higher-order action planning for individual and joint object manipulations.

    PubMed

    Meyer, Marlene; van der Wel, Robrecht P R D; Hunnius, Sabine

    2013-04-01

    Many actions involve multiple action steps, which raises the question how far ahead people plan when they perform such actions. Here, we examined higher-order planning for action sequences and whether people planned similarly or differently when acting individually or together with an action partner. For individual performances, participants picked up an object with one hand and passed it to their other hand before placing it onto a target location. For joint performances, they picked up the object and handed it to their action partner, who placed it onto the target location. Each object could be grasped at only two possible grasping positions, implying that the first selected grasp on the object determined the postures for the rest of the action sequence. By varying the height of the target shelf, we tested whether people planned ahead and modulated their grasp choices to avoid uncomfortable end postures. Our results indicated that participants engaged in higher-order planning, but needed task experience before demonstrating such planning during both individual and joint performances. The rate of learning was similar in the two conditions, and participants transferred experience from individual to joint performance. Our results indicate similarity in mechanisms underlying individual and joint action sequence planning. PMID:23361302

  20. Final consolidated action plan to Tiger Team. Volume 1, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  1. Final consolidated action plan to Tiger Team. Volume 2, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  2. Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1

    SciTech Connect

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

  3. Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David A. Strand

    2004-10-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554.

  4. A soil plan of action to awaken society beyond 2015

    NASA Astrophysics Data System (ADS)

    Jones, Arwyn; Bampa, Francesca; Towers, Willie; Broll, Gabrielle; Vargas, Ronald

    2014-05-01

    suite of positive examples offered by soil enthusiasts is to provide a common platform appropriate to all parts of the world, with a common consensus on soil issues to be covered and be brought to the table of consumers. The Global Soil Partnership (GSP) is an interactive, responsive and voluntary partnership, open to governments, regional organizations, institutions and other stakeholders. One of the pillars of action aims to "Encourage investment, technical cooperation, policy, education awareness and extension in soil". In order to achieve this goal, a small regionally balanced committee was formed following the 3rd European Network on Soil Awareness conference in Aberdeen and the 2nd Global Soil Week in Berlin. This group produced a draft plan of action that will be submitted to the Intergovernmental technical Panel on Soils (ITPS) of the GSP. Some key points that we need to address are: finding new soil communicators to awake and engage the society and the political arena (e.g. actors, poets, artists, etc.); focusing on a harmonised public perception of soil and their importance for environment and society; re-introducing soil science into the school curricula as a cross-cutting discipline designing a coherent but flexible structure and ensuring a proper and logical constructive transition between each learning stage (e.g. training teachers, web-based courses/ web-based platform, etc.). REFERENCES Bouma J, Broll G, Crane TA, Dewitte O, Gardi C, Schulte RPO, Towers W (2012) Soil information in support of policy making and awareness raising. Current Opinion in Environmental Sustainability, 4, 552-558. EC (2006) (COM(2006)231 final) Communication from the Commission to the Council, the European Parliament, the European Economic and Social Committee of the Regions, Thematic Strategy for Soil Protection. (ed Commission E), Brussels, Belgium.

  5. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    NASA Technical Reports Server (NTRS)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  6. I Plan Therefore I Choose: Free-Choice Bias Due to Prior Action-Probability but Not Action-Value

    PubMed Central

    Suriya-Arunroj, Lalitta; Gail, Alexander

    2015-01-01

    According to an emerging view, decision-making, and motor planning are tightly entangled at the level of neural processing. Choice is influenced not only by the values associated with different options, but also biased by other factors. Here we test the hypothesis that preliminary action planning can induce choice biases gradually and independently of objective value when planning overlaps with one of the potential action alternatives. Subjects performed center-out reaches obeying either a clockwise or counterclockwise cue-response rule in two tasks. In the probabilistic task, a pre-cue indicated the probability of each of the two potential rules to become valid. When the subsequent rule-cue unambiguously indicated which of the pre-cued rules was actually valid (instructed trials), subjects responded faster to rules pre-cued with higher probability. When subjects were allowed to choose freely between two equally rewarded rules (choice trials) they chose the originally more likely rule more often and faster, despite the lack of an objective advantage in selecting this target. In the amount task, the pre-cue indicated the amount of potential reward associated with each rule. Subjects responded faster to rules pre-cued with higher reward amount in instructed trials of the amount task, equivalent to the more likely rule in the probabilistic task. Yet, in contrast, subjects showed hardly any choice bias and no increase in response speed in favor of the original high-reward target in the choice trials of the amount task. We conclude that free-choice behavior is robustly biased when predictability encourages the planning of one of the potential responses, while prior reward expectations without action planning do not induce such strong bias. Our results provide behavioral evidence for distinct contributions of expected value and action planning in decision-making and a tight interdependence of motor planning and action selection, supporting the idea that the underlying

  7. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... three elements: a reasonable self analysis; a reasonable basis for concluding action is appropriate; and reasonable action. (a) Reasonable self analysis. The objective of a self analysis is to determine whether... analysis. The employer may utilize techniques used in order to comply with Executive Order 11246,...

  8. Alternatives/action plan report for outfall 17

    SciTech Connect

    1994-11-01

    This Document contains information pertaining to alternatives/action associated with controlling ammonia entering through outfall 17. This document identifies the location of contaminate source, the ammonia concentration levels entering East Fork Poplar Creek, and the action taken to reduce/eliminate the toxicity problem.

  9. Connecting the Dots--From Planning to Implementation: Translating Commitments into Action in a Strategic Planning Process

    ERIC Educational Resources Information Center

    Mieso, Rob Roba

    2010-01-01

    This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…

  10. Climatic Action Plan Project for the state of Veracruz (Mexico)

    NASA Astrophysics Data System (ADS)

    Tejeda, A.; Ochoa, C.

    2007-05-01

    With financing of the British Government and support of the National Institute of Ecology, from April of 2006 to March of 2008 an action plan which intends variability effects and climatic change for the state of Veracruz will be made. This plan will be taken to the state government and will be spread out to manufacturers, industrialists and population. Throughout the Gulf of Mexico, the state of Veracruz is a 745 km coast in length with a width that goes from 156 km in the center to 47 km in the north. The state has large mountains, forests, plains, rivers, cascades, lagoons and coasts. Veracruz is the 10th largest state in Mexico with a 72,420 km2 surface, it is located between 17°00' and 22°28' north latitude and between 93°95' and 98°38' west longitude. Because of the orographic effect, the Sierra Madre Oriental causes the existence of many types of climate, from dry to tropical forest, going through snow on the top of the Pico de Orizaba (5747m of altitude). The wind affects the coasts by not allowing to fish during a hundred days a year (particularly in winter), and on summer tropical waves and occasionally hurricanes affect rivers causing overflow and urban floods in fields. These phenomena do not have a regular affectation; they are subject to climate variability effects. Veracruz is the third state with most population in the country (7.1 million people in 2005), only surpassed by the state of Mexico and Mexico City. Although it occupies 3.7% of the national territory, Veracruz has 6.9% of human population in the country, and is the 6th state of PIB national contribution (240 thousands of millions pesos approximately). Of the possible effects of the climatic change the following can be expected: , , : Most of the coasts of the Gulf of Mexico, low and sandy, less of a meter on the sea level, represent the most vulnerable territory of Veracruz. Towns will be affected, the saline water will infiltrate until the phreatic mantles and the coast electrical

  11. Annual status report on the Uranium Mill Tailings Remedial Action Program

    SciTech Connect

    Not Available

    1985-12-01

    FY 1985 project accomplishments include: completed 90% of the processing site remedial actions at Canonsburg, Pennsylvania, and initiated remedial actions at Salt Lake City, Utah, and Shiprock, New Mexico; awarded remedial action contracts on 329 vicinity properties at seven designated locations and completed survey and inclusion activities on a total of 1620 vicinity properties; published the Environmental Assessment (EA) for Lakeview, Oregon, issued the draft and prepared the final Environmental Impact Statement (EIS) for Durango, Colorado; completed the Remedial Action Plan (RAP) for Lakeview, Oregon, and prepared the draft RAP for Durango, Colorado; executed cooperative agreements with Idaho, New Mexico, and the Navajo Nation/Hopi Tribe; executed a Memorandum of Understanding with the Nuclear Regulatory Commission; and developed proposed UMTRA Project design review criteria between DOE and the NRC.

  12. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

  13. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    SciTech Connect

    T. M. Fitzmaurice

    2000-08-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

  14. Tumor cell migration and invasion are enhanced by depletion of Rap1 GTPase-activating protein (Rap1GAP).

    PubMed

    Tsygankova, Oxana M; Wang, Hongbin; Meinkoth, Judy L

    2013-08-23

    The functional significance of the widespread down-regulation of Rap1 GTPase-activating protein (Rap1GAP), a negative regulator of Rap activity, in human tumors is unknown. Here we show that human colon cancer cells depleted of Rap1GAP are endowed with more aggressive migratory and invasive properties. Silencing Rap1GAP enhanced the migration of confluent and single cells. In the latter, migration distance, velocity, and directionality were increased. Enhanced migration was a consequence of increased endogenous Rap activity as silencing Rap expression selectively abolished the migration of Rap1GAP-depleted cells. ROCK-mediated cell contractility was suppressed in Rap1GAP-depleted cells, which exhibited a spindle-shaped morphology and abundant membrane protrusions. Tumor cells can switch between Rho/ROCK-mediated contractility-based migration and Rac1-mediated mesenchymal motility. Strikingly, the migration of Rap1GAP-depleted, but not control cells required Rac1 activity, suggesting that loss of Rap1GAP alters migratory mechanisms. Inhibition of Rac1 activity restored membrane blebbing and increased ROCK activity in Rap1GAP-depleted cells, suggesting that Rac1 contributes to the suppression of contractility. Collectively, these findings identify Rap1GAP as a critical regulator of aggressive tumor cell behavior and suggest that the level of Rap1GAP expression influences the migratory mechanisms that are operative in tumor cells. PMID:23864657

  15. Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-04-06

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  16. Taking the Guesswork Out of Affirmative Action Planning

    ERIC Educational Resources Information Center

    Flast, Robert H.

    1977-01-01

    Noting that government agencies can better measure a company's compliance with affirmative action policies if the company uses predictive techniques, two such techniques--the flow model and the optimizing--are described and briefly compared. (SH)

  17. Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0

    SciTech Connect

    Susan Evans

    2004-11-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release

  18. Planning, preparation, execution, and imagery of volitional action.

    PubMed

    Deecke, L

    1996-03-01

    There are different motor sets, which a human subject can be in or act from: he or she can be in a self-initiated voluntary movement set (action) or in a response set (re-action). Also, imagery sets are available that are necessary for the acquisition and practice of skill. Most important are such imagery sets for rehearsal in theatre, dance, music, sports, combat, etc. PMID:8713545

  19. A Social-Action Approach for Planning Education.

    ERIC Educational Resources Information Center

    Bolan, Richard S.; And Others

    The growing complexity of urban industrial society necessitates adequate planning techniques to insure future livability, but traditional methods of training planners have emphasized technology and ignored the human element. To remedy this deficiency, training programs should be expanded to include the social and political aspects of planning.…

  20. An Economic Evaluation of Asthma Action Plans for Children with Asthma

    PubMed Central

    Polisena, Julie; Tam, Susanna; Lodha, Abhay; Laporte, Audrey; Coyte, Peter C.; Ungar, Wendy J.

    2016-01-01

    The costs and effectiveness of asthma action plans for children were evaluated in a cross-sectional economic analysis. Direct health care and indirect costs, nights with symptoms, and asthma attacks were measured in 879 Ontario children with asthma. From a societal perspective, the total annual costs of the asthma action plan and the control groups were CDN$6, 948 and CDN$6, 140 per patient, respectively. Health outcomes were similar. The difference in cost was attributable to greater medication and health services use in the intervention group. Prospective randomized trials are necessary to measure potential improvements in control of asthma using asthma action plans. PMID:17885851