Science.gov

Sample records for action plan released

  1. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 536: AREA 3 RELEASE SITE, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2005-09-01

    CAU 536 consists of CAS 03-44-02, Steam Jenny Discharge, located in Area 3 of the NTS. The site was characterized in 2004 according to the approved CAIP and the site characterization results are reported in the CAU 536 CADD. The purpose of this Corrective Action Plan (CAP) is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 536 CADD.

  2. Corrective action investigation plan for Corrective Action Unit 340, Pesticide Release Sites, Nevada Test Site, Nye County, Nevada

    SciTech Connect

    1998-01-01

    This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to the FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.

  3. Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David A. Strand

    2004-10-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554.

  4. Corrective Action Investigation Plan for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada (Rev. 0 / June 2003), Including Record of Technical Change No. 1

    SciTech Connect

    2003-06-27

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives for CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.

  5. Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada, Rev. 0 with ROTC No. 1 and ROTC No. 2

    SciTech Connect

    Robert F. Boehlecke

    2004-10-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to CAS 23-02-08. The scope of the corrective action investigation

  6. 3RS action plan

    SciTech Connect

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  7. National Wetlands Mitigation Action Plan

    EPA Pesticide Factsheets

    On December 26, 2002, EPA and the Corps of Engineers announced the release of a comprehensive, interagency National Wetlands Mitigation Action Plan to further achievement of the goal of no net loss of wetlands.

  8. Corrective Action Investigation plan for Corrective Action Unit 546: Injection Well and Surface Releases, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Alfred Wickline

    2008-03-01

    Corrective Action Unit (CAU) 546 is located in Areas 6 and 9 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 546 is comprised of two Corrective Action Sites (CASs) listed below: •06-23-02, U-6a/Russet Testing Area •09-20-01, Injection Well These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 8, 2007, by representatives of the Nevada Division of Environmental Protection and U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process has been used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 546.

  9. Planning as Action Research

    ERIC Educational Resources Information Center

    de Gonzalez, Carmen Beatriz; Hernandez, Teresa; Kusch, Jim; Ryan, Charly

    2004-01-01

    Planning contains so much more than the written plan. Early in 2000, an invitation came from the Collaborative Action Research Network (CARN), to people experienced in action research who might want to help plan and present an action research event for elementary school science teachers in Venezuela, South America, in Autumn 2000. This article…

  10. National Biofuels Action Plan

    DTIC Science & Technology

    2008-10-01

    Leading the Federal Interagency Biomass Research and Development Initiative October 2008 National Biofuels Action Plan Biomass Research and...REPORT DATE OCT 2008 2. REPORT TYPE 3. DATES COVERED 00-00-2008 to 00-00-2008 4. TITLE AND SUBTITLE National Biofuels Action Plan 5a. CONTRACT...goal of the National Biofuels Action Plan is to maximize the environmental and economic benefi ts of biofuels use by advancing sustainable practices

  11. Corrective Action Investigation Plan for Corrective Action Unit 556: Dry Wells and Surface Release Points Nevada Test Site, Nevada (Draft), Revision 0

    SciTech Connect

    Grant Evenson

    2007-02-01

    Corrective Action Unit  (CAU) 556, Dry Wells and Surface Release Points, is located in Areas 6 and 25 of the Nevada Test Site, 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 556 is comprised of four corrective action sites (CASs) listed below: •06-20-04, National Cementers Dry Well •06-99-09, Birdwell Test Hole •25-60-03, E-MAD Stormwater Discharge and Piping •25-64-01, Vehicle Washdown and Drainage Pit These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.

  12. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 322: AREAS 1 AND 3 RELEASE SITES AND INJECTION WELLS, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2005-09-01

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CADD. From April 2004 through September 2004, CAU 322 site characterization activities were conducted. CAU 322 consists of three CASs located in Areas 1 and 3 of the NTS.

  13. Benzidine Dyes Action Plan

    EPA Pesticide Factsheets

    This Action Plan addresses the use of benzidine-based dyes and benzidine congener-based dyes, both metalized and non-metalized, in products that would result in consumer exposure, such as for use to color textiles.

  14. What's an Asthma Action Plan?

    MedlinePlus

    ... to 2-Year-Old What's an Asthma Action Plan? KidsHealth > For Parents > What's an Asthma Action Plan? ... normal everyday activities without having asthma symptoms. Action Plans Are Unique Each person's experience with asthma is ...

  15. ES H action plan

    SciTech Connect

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  16. Corrective Action Investigation Plan for Corrective Action Unit 322: Areas 1 and 3 Release Sites and Injection Wells, Nevada Test Site, Nevada: Revision 0, Including Record of Technical Change No. 1

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-07-16

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 322, Areas 1 and 3 Release Sites and Injection Wells, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 322 consists of three Corrective Action Sites (CASs): 01-25-01, AST Release (Area 1); 03-25-03, Mud Plant AST Diesel Release (Area 3); 03-20-05, Injection Wells (Area 3). Corrective Action Unit 322 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. The investigation of three CASs in CAU 322 will determine if hazardous and/or radioactive constituents are present at concentrations and locations that could potentially pose a threat to human health and the environment. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  17. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    In order to develop an affirmative action plan at Triton College, the college President appointed a committee made up of nine representatives from the various college constituencies, the majority of which were women and minorities, to determine the objectives to be achieved and how to implement them, and to establish appropriate review procedures.…

  18. Mitigation Action Plan

    SciTech Connect

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  19. Guam Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  20. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada

    SciTech Connect

    A. T. Urbon

    2001-09-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 326, Areas 6 and 27 Release Sites. This CAU is currently listed in the January 2001, Appendix III of the Federal Facilities Agreement and Consent Order (FFACO) (FFACO, 1996). CAU 326 is located on the Nevada Test Site (NTS) and consists of the following four Corrective Action Sites (CASS) (Figure 1): CAS 06-25-01--Is a rupture in an underground pipe that carried heating oil (diesel) from the underground heating oil tank (Tank 6-CP-1) located to the west of Building CP-70 to the boiler in Building CP-1 in the Area 6 Control Point (CP) compound. CAS 06-25-02--A heating oil spill that is a result of overfilling an underground heating oil tank (Tank 6-DAF-5) located at the Area 6 Device Assembly Facility (DAF). CAS 06-25-04--A release of waste oil that occurred while removing used oil to from Tank 6-619-4. Tank 6-619-4 is located northwest of Building 6-619 at the Area 6 Gas Station. CAS 27-25-01--Consists of an excavation that was created in an attempt to remove impacted stained soil from the Site Maintenance Yard in Area 27. Approximately 53.5 cubic meters (m{sup 3}) (70 cubic yards [yd{sup 3}]) of soil impacted by total petroleum hydrocarbons (TPH) and polychlorinated biphenyls (PCBs) was excavated before the excavation activities were halted. The excavation activities were stopped because the volume of impacted soil exceeded estimated quantities and budget.

  1. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  2. What's an Asthma Action Plan?

    MedlinePlus

    ... so that you (as well as your child's teachers, relatives, and caregivers) can respond as needed, even in stressful situations. previous continue Putting the Plan to Good Use Your child's action plan will be most ...

  3. Plan of action. Information.

    PubMed

    Leduc, J W

    1996-11-01

    This article provides information on WHO¿s strategic plan of action to aid countries around the world in detecting and controlling emerging infectious diseases. Activities are conducted through an organizational structure that ensures cost-sharing among all the 190 member states of WHO. Four major goals incorporating specific tasks are suggested: 1) the strengthening of global surveillance of infectious diseases through WHO collaborating centers; 2) the rebuilding of the international infrastructure to recognize, report, and respond to emerging and resurgent infectious diseases through laboratory and communication improvement 3) the fostering of applied research through greater practical use of the biotechnological revolution, and 4) the enhancement of the international capacity for infectious disease prevention and control through defined and practical public health steps. To implement this program, a workshop has been conducted and the WHONET program for laboratories has been introduced. In addition, clear guidance will be needed on the question of when to make changes in the antimicrobials recommended for specific diseases. The WHO strategy aims to enhance the capacity of local and national public health laboratories, to foster applied research to address practical problems, and to improve infectious disease prevention and control.

  4. Plan for early action: Recommendations

    SciTech Connect

    1998-12-31

    This report contains recommendations on the implementation of an action plan to reduce or recapture greenhouse gas (GHG) emissions in British Columbia. The report includes the consensus recommendations of the BC Greenhouse Gas Forum, as well as those items on which Forum participants have agreed to disagree, plus the reasons for those differences. The recommendations include: Umbrella actions which may affect several or all sectors of the economy, or support the success of other actions; actions to reduce vehicle kilometers travelled; actions to increase vehicle efficiency or increase the use of alternative fuels or technologies; actions to decrease GHG emissions from energy production; actions to increase end-use energy efficiency; and actions to reduce non-energy-related emissions. Appendices include work sheets on each action, with a description of the action and information on the action`s rationale, experience elsewhere, related policy initiatives, and key issues regarding feasibility and implementation.

  5. 28 CFR 2.83 - Release planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Release planning. 2.83 Section 2.83... Release planning. (a) All grants of parole shall be conditioned on the development of a suitable release... parole date for purposes of release planning for up to 120 days without a hearing. If efforts...

  6. Toluene Diisocyanates (TDI) Action Plan

    EPA Pesticide Factsheets

    This Action Plan addresses the use of toluene diisocyanate (TDI) and related compounds in products that may result in consumer and general population exposures, particularly in or around buildings, including homes and schools.

  7. Action Understanding as Inverse Planning

    ERIC Educational Resources Information Center

    Baker, Chris L.; Saxe, Rebecca; Tenenbaum, Joshua B.

    2009-01-01

    Humans are adept at inferring the mental states underlying other agents' actions, such as goals, beliefs, desires, emotions and other thoughts. We propose a computational framework based on Bayesian inverse planning for modeling human action understanding. The framework represents an intuitive theory of intentional agents' behavior based on the…

  8. American Samoa: Energy Action Plan

    SciTech Connect

    Ness, J. Erik; Haase, Scott; Conrad, Misty

    2016-09-01

    This document outlines actions being taken to reduce American Samoa's petroleum consumption. It describes the four near-term strategies selected by the American Samoa Renewable Energy Committee during action-planning workshops conducted in May 2016, and describes the steps that will need to be taken to implement those strategies.

  9. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh.

    This affirmative action (AA) guide is intended to identify and remove discriminatory employment practices that may still exist in the North Carolina State Department of Public Instruction (DPI). DPI extends equal employment opportunity (EEO) to all applicants and employees without regard to race, color, religion, sex, age, handicap, political…

  10. American Samoa Energy Action Plan

    SciTech Connect

    Haase, Scott; Esterly, Sean; Herdrich, David; Bodell, Tim; Visser, Charles

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  11. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  12. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  13. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  14. 28 CFR 2.33 - Release plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 1 2012-07-01 2012-07-01 false Release plans. 2.33 Section 2.33 Judicial..., AND JUVENILE DELINQUENTS United States Code Prisoners and Parolees § 2.33 Release plans. (a) A grant of parole is conditioned upon the approval of release plans by the Regional Commissioner. In...

  15. 28 CFR 2.33 - Release plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Administration DEPARTMENT OF JUSTICE PAROLE, RELEASE, SUPERVISION AND RECOMMITMENT OF PRISONERS, YOUTH OFFENDERS... of parole is conditioned upon the approval of release plans by the Regional Commissioner. In general... reasonable plan for payment shall, where feasible, be included in the parole release plan....

  16. 28 CFR 2.33 - Release plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Administration DEPARTMENT OF JUSTICE PAROLE, RELEASE, SUPERVISION AND RECOMMITMENT OF PRISONERS, YOUTH OFFENDERS... of parole is conditioned upon the approval of release plans by the Regional Commissioner. In general... reasonable plan for payment shall, where feasible, be included in the parole release plan....

  17. 28 CFR 2.33 - Release plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false Release plans. 2.33 Section 2.33 Judicial..., AND JUVENILE DELINQUENTS United States Code Prisoners and Parolees § 2.33 Release plans. (a) A grant of parole is conditioned upon the approval of release plans by the Regional Commissioner. In...

  18. Quick-Release Pin With Lever Action

    NASA Technical Reports Server (NTRS)

    Trevino, Robert C.

    1995-01-01

    Lever-action quick-release pin operated more easily. Mechanism operated with gloved hand. In modified version, lever added to handle to facilitate actuation. Lever action reduces actuation force. Lever-action pin operated by squeezing on any point of moveable ends of lever and handle together between thumb and forefinger or by simply grasping and squeezing handle and lever with entire hand in more natural grasp.

  19. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.320 Section 91.320... Consolidated Plan § 91.320 Action plan. The action plan must include the following: (a) Standard Form 424; (b) A concise executive summary that includes the objectives and outcomes identified in the plan as...

  20. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.220 Section 91.220... Consolidated Plan § 91.220 Action plan. The action plan must include the following: (a) Standard Form 424; (b) A concise executive summary that includes the objectives and outcomes identified in the plan as...

  1. One School's Positive Action Plan.

    ERIC Educational Resources Information Center

    McCormack, Sammie

    Because they felt that students can be responsible for their own behavior, the staff of Jefferson Elementary School, serving 300 students in grades 1 through 4 in a small rural community, developed a program which promoted self-management. In September 1979, teachers participated in an assertive discipline workshop. A Positive Action Plan evolved,…

  2. 28 CFR 2.33 - Release plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Release plans. 2.33 Section 2.33 Judicial Administration DEPARTMENT OF JUSTICE PAROLE, RELEASE, SUPERVISION AND RECOMMITMENT OF PRISONERS, YOUTH OFFENDERS, AND JUVENILE DELINQUENTS United States Code Prisoners and Parolees § 2.33 Release plans. (a) A...

  3. Texas Solar Collaboration Action Plan

    SciTech Connect

    Winland, Chris

    2013-02-14

    Texas Solar Collaboration Permitting and Interconenction Process Improvement Action Plan. San Antonio-specific; Investigate feasibility of using electronic signatures; Investigate feasibility of enabling other online permitting processes (e.g., commercial); Assess need for future document management and workflow/notification IT improvements; Update Information Bulletin 153 regarding City requirements and processes for PV; Educate contractors and public on CPS Energy’s new 2013 solar program processes; Continue to discuss “downtown grid” interconnection issues and identify potential solutions; Consider renaming Distributed Energy Resources (DER); and Continue to participate in collaborative actions.

  4. Hungarian climate change action plan

    SciTech Connect

    Molnar, S.; Takacs, T.; Arpasi, M.; Farago, T.; Palvoelgyi, T.; Harnos, Z.; Lontay, Z.; Somogyi, Z.; Tajthy, T.

    1998-12-31

    In 1994--1996, within the framework of the US Country Studies Program, the Hungarian Country Study Team developed the national greenhouse gas emission inventory, and elaborated the mitigation options for the different sectors of the economy. In 1997, the development of a National Action Plan was begun as the continuation of this work. Results of the inventory study showed that greenhouse gas emissions decreased from the selected base level (i.e., from the yearly average emissions of 1985--1987) until 1994 by cca. 25%. However, this decrease was primarily caused by the deep economic recession. Therefore the policy makers have to face the problem of economic recovery without a relevant increase of greenhouse gas emissions in the near future. This is the main focus of the mitigation analysis and the National Action Plan.

  5. India's National Action Plan on Climate Change

    PubMed Central

    Pandve, Harshal T.

    2009-01-01

    Climate change is one of the most critical global challenges of our times. Recent events have emphatically demonstrated our growing vulnerability to climate change. Climate change impacts will range from affecting agriculture – further endangering food security – to sea-level rise and the accelerated erosion of coastal zones, increasing intensity of natural disasters, species extinction, and the spread of vector-borne diseases. India released its much-awaited National Action Plan on Climate Change (NAPCC) to mitigate and adapt to climate change on June 30, 2008, almost a year after it was announced. The NAPCC runs through 2017 and directs ministries to submit detailed implementation plans to the Prime Minister's Council on Climate Change by December 2008. This article briefly reviews the plan and opinion about it from different experts and organizations. PMID:20165607

  6. Developing a Global Green Freight Action Plan

    EPA Pesticide Factsheets

    This Climate and Clean Air Coalition (CCAC) presentation gives an overview of the Global Green Freight Action Plan to improve the energy efficiency and environmental performance of freight operations worldwide along with developing an action plan.

  7. Final Federal Radon Action Plan Scorecard

    EPA Pesticide Factsheets

    This page provides information and a link to the draft Federal Radon Action Plan. It also contains a Federal Radon Action Plan Scorecard, a tool designed to display the current status of each federal agency commitments and outcomes to date.

  8. Corrective Action Planning for Environmental Compliance Deficiencies

    SciTech Connect

    Sigmon, C. F.; Ashburn, S. A.; Jolley, R. L.; Smith, A. A.; Mercer, A. E.; Oeulette, B.; Renz, K.; Scott, S.

    1995-01-01

    Effective corrective action planning is one of the cornerstones of an effective environmental management program. Alternatively, ineffective planning can highlight an installation`s unwillingness or inability to effectively address environmental compliance deficiencies. The following paper discusses several guidelines to consider in corrective action planning to ensure that plans benefit rather than harm an installation`s overall environmental management program.

  9. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Consortia; Contents of Consolidated Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a Standard Form 424 for the consortium for the HOME program. Each entitlement jurisdiction also must submit...

  10. National Action Plan for Energy Efficiency Report

    EPA Pesticide Factsheets

    This seminal report includes the Action Plan recommendations, identifies key barriers, and summarizes methods for energy efficiency in utility ratemaking and revenue requirements, energy resource planning processes, rate design, and other best practices.

  11. Steamlined Approach for Environmental Restoration (SAFER) Plan For Corrective Action Unit 394: Areas 12, 18, and 29, Spill/Release Sites, Nevada Test Site, Nevada (November 2001, Rev. 0)

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office

    2001-09-24

    This plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 394: Areas 12, 18, and 29, Spill/Release Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site, consists of six Corrective Action Sites (CASs): CAS 12-25-04, UST 12-16-2 Waste Oil Release; CAS 18-25-02, Oil Spills; CAS 18-25-02, Oil Spills; CAS 18-25-03, Oil Spill; CAS 18-25-04, Spill (Diesel Fuel); CAS 29-44-01, Fuel Spill (a & b). Process knowledge is the basis for the development of the conceptual site models (CSMs). The CSMs describe the most probable scenario for current conditions at each site, and define the assumptions that are the basis for the SAFER plan. The assumptions are formulated from historical information and process knowledge. Vertical migration of contaminant(s) of potential concern (COPCs) is expected to be predominant over lateral migration in the absence of any barrier (with asphalt /concrete being the exception at least two of the CASs). Soil is the impacted or potentially impacted media at all the sites, with asphalt and/or concrete potentially impacted at two of the CASs. Radionuclides are not expected at any CAS; hydrocarbons are the primary COPC at each CAS, and can be used to guide the investigation; future land-use scenarios limit use to various nonresidential uses; and exposure scenarios are limited by future land-use scenarios to site workers. There is sufficient information and process knowledge from historical documentation regarding the expected nature and extent of potential contaminants to recommend closure of CAU 394 using the SAFER process. On completion of the field activities, a Closure Report will be prepared and submitted to the NDEP for review and approval.

  12. 76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... To Combat Antimicrobial Resistance AGENCY: Centers for Disease Control and Prevention (CDC... the draft, A Public Health Action Plan to Combat Antimicrobial Resistance (76 FR 14402). Written and..., Office of Antimicrobial Resistance, Attn: Antimicrobial Resistance Action Plan, Docket No....

  13. Exploiting map plans as resources for action

    NASA Technical Reports Server (NTRS)

    Payton, David

    1989-01-01

    When plans are used as programs for controlling the action of autonomous or teleoperated robots, their abstract representation can easily obscure a great deal of the critical knowledge that originally led to the planned course of action. An autonomous vehicle experiment is highlighted which illustrates how the information barriers created by abstraction can result in undesirable action. It is then shown how the same task can be performed correctly using plans as a resource for action. As a result of this simple change in outlook, problems requiring opportunistic reaction to unexpected changes in the environment can be solved.

  14. Planning actions in robot automated operations

    NASA Technical Reports Server (NTRS)

    Das, A.

    1988-01-01

    Action planning in robot automated operations requires intelligent task level programming. Invoking intelligence necessiates a typical blackboard based architecture, where, a plan is a vector between the start frame and the goal frame. This vector is composed of partially ordered bases. A partial ordering of bases presents good and bad sides in action planning. Partial ordering demands the use of a temporal data base management system.

  15. The Development of Action Planning in a Joint Action Context

    ERIC Educational Resources Information Center

    Paulus, Markus

    2016-01-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus.…

  16. In Brief: Environmental Protection Agency releases strategic plan

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2010-10-01

    Five grand strategic goals are the centerpiece of a strategic plan released on 30 September by the U.S. Environmental Protection Agency (EPA). The plan for fiscal years 2011-2015 outlines goals including taking action on climate change and improving air quality, protecting America's waters, cleaning up communities and advancing sustainable development, ensuring the safety of chemicals and preventing pollution, and enforcing environmental laws. “We will continue to affirm the core values of science, transparency, and the rule of law in addressing these priorities. These are the most urgent issues we must confront through 2015,” EPA administrator Lisa Jackson wrote in the plan. For more information, visit http://www.epa.gov/ocfo/plan/2015/FY2011_2015_EPA_Strategic_Plan.pdf.

  17. The Climate Change Action Plan: Technical supplement

    SciTech Connect

    Not Available

    1994-03-01

    This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

  18. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  19. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  20. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  1. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  2. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  3. National Security Technology Incubator Action Plan

    SciTech Connect

    None, None

    2008-02-28

    This report documents the action plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). This action plan serves as a tool in measuring progress in the development process and delivery of services for the NSTI program. Continuous review and evaluation of the action plan is necessary in the development process of the NSTI. The action plan includes detailed steps in developing the NSTI program based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Included are tasks required to implement the NSTI, developed within a work breakdown structure. In addition, a timeline is identified for each task.

  4. World Plan of Action: Decade for Women.

    ERIC Educational Resources Information Center

    Women's Equity Action League, Washington, DC.

    The World Plan of Action adopted by the United Nations World Conference of the International Women's Year in Mexico City in July 1975 is presented in condensed form. The major purpose is to provide guidelines for national action over the ten-year period 1975-1985 as part of a sustained, long-term effort to achieve the objectives of International…

  5. Gathering Strength: Canada's Aboriginal Action Plan.

    ERIC Educational Resources Information Center

    Department of Indian Affairs and Northern Development, Ottawa (Ontario).

    Designed to renew the relationship between the Canadian government and the Aboriginal peoples of Canada, this action plan contains a statement of reconciliation, a statement of renewal, and four key objectives for action. First, renewing partnerships includes community-based healing to address the negative effects of the residential schools…

  6. Put your development plan into action.

    PubMed

    Day-Calder, Mandy

    2017-04-05

    Having completed your appraisal, you will have a plan for the year ahead. Hopefully you have learned from your appraisal discussion and feel motivated. But to have a successful year ahead and grow as a nursing professional, you will need to turn your personal development plan (PDP) into action. Here we look at ways you can do so without feeling overwhelmed.

  7. Action Planning and Recording Achievement.

    ERIC Educational Resources Information Center

    Green, Muriel

    This document examines strategies and procedures that British further education (FE) colleges can use to develop and enhance systems and structures for guiding and supporting learners and learning. It is based on the findings of a field test of the Managing Learning model for planning and recording the process of FE students. First, the importance…

  8. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    SciTech Connect

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  9. Environmental Release Prevention and Control Plan

    SciTech Connect

    Mamatey, A.; Arnett, M.

    1997-10-01

    During the history of SRS, continual improvements in facilities, process, and operations, and changes in the site`s mission have reduced the amount of radioactive liquid releases. In the early years of SRS (1958 to 1965), the amount of tritium discharged to the Savannah River averaged approximately 61,000 curies a year. During the mid-1980`s (1983 to 1988), liquid releases of tritium averaged 27,000 curies a year. By 1996, liquid releases of tritium are projected to be just 3000 curies for the year. This large projected decrease is the result of the planned shut-down of all reactors and the anticipated significant decline in the amount of tritium migrating from the site seepage basins and the Solid Waste Disposal Facility.

  10. 76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... To Combat Antimicrobial Resistance AGENCY: Centers for Disease Control and Prevention (CDC... Action Plan to Combat Antimicrobial Resistance. HHS/CDC is publishing this notice on behalf of the HHS Interagency Task Force on Antimicrobial Resistance. The draft Action Plan and supporting documents can...

  11. Final Action Plan to Tiger Team

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  12. ICDF Complex Remedial Action Work Plan

    SciTech Connect

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  13. 7 CFR 275.16 - Corrective action planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which:...

  14. Action plan for the Tiger Team assessment report

    SciTech Connect

    Not Available

    1990-08-30

    This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

  15. Action Plan for Florida's Public Libraries. Addendum.

    ERIC Educational Resources Information Center

    Florida Library Study Commission, Tallahassee.

    The introduction to this addendum (the Action Plan is LI 004 521) discusses the present use by libraries of information-handling technology and identifies some of the trends taking place in performing essential library services. While some limited inroads have been made in automating certain public library functions, the bulk of services is still…

  16. Triton College Faculty Recruitment Action Plan (FRAP).

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    Triton College's (Illinois) Faculty Recruitment Action Plan (FRAP) provides a detailed guide to hiring new faculty, focusing on the desired characteristics of new faculty; marketing and recruitment strategies; employment incentives; the application, interviewing, and selection process; new faculty orientation; a timeline for implementation; cost…

  17. Chemical Safety for Sustainability: Research Action Plan

    EPA Pesticide Factsheets

    The Strategic Research Action Plan for EPA’s Chemical Safety for Sustainability research program presents the purpose, design and themes of the Agency’s research efforts to ensure safety in the design, manufacture and use of existing and future chemicals.

  18. Emergency Action Plans in Physical Education

    ERIC Educational Resources Information Center

    Tanis, Cindy J.; Hebel, Susan L.

    2016-01-01

    Emergency Action Plans (EAP) are essential to properly manage injuries and illnesses in physical education and sport. However, most literature discusses EAP's in the athletic arena instead of physical education. The purpose of this study was to examine physical education instructors' experiences of student illness and injury, discuss the steps of…

  19. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park...

  20. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park...

  1. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park...

  2. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park...

  3. Remedial Action Plan for Fort Douglas

    DTIC Science & Technology

    1994-03-01

    of the Comprehensive Environmental Response, This Remedial Action Plan (RAP), issued by the U.S. Compensation, and Liability Act ( CERCLA ), also Army...Army), identifies the preferred alternatives for known as Superfund , and the National Environmental cleaning up electrical utility transformers and...transferred to the University of have generally followed guidance established in Utah. This transferred property is known as the CERCLA . The purpose of

  4. National Biofuels Action Plan, October 2008

    SciTech Connect

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  5. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  6. Corrective Action Decision Document for Corrective Action Unit 340: Pesticide Release sites, Nevada Test Site, Nevada

    SciTech Connect

    DOE /NV

    1998-12-08

    This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.

  7. 24 CFR 248.217 - Revisions to plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AUTHORITIES PREPAYMENT OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income Preservation Act of 1987 § 248.217 Revisions to plan of action. The owner may from time to...

  8. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  9. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  10. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  11. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  12. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  13. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... action plan. 906.4 Section 906.4 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT... action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... such as legal, architectural, engineering, and financial; (3) Purchasing materials and supplies...

  14. 43 CFR 3482.2 - Action on plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Exploration and Resource Recovery and Protection Plans § 3482.2 Action on plans. (a)(1) Exploration plans. The... with the approval terms of the exploration plan. (2) Resource recovery and protection plans. No resource recovery and protection plan or modification thereto shall be approved which is not in...

  15. 43 CFR 3482.2 - Action on plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Exploration and Resource Recovery and Protection Plans § 3482.2 Action on plans. (a)(1) Exploration plans. The... with the approval terms of the exploration plan. (2) Resource recovery and protection plans. No resource recovery and protection plan or modification thereto shall be approved which is not in...

  16. 43 CFR 3482.2 - Action on plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Exploration and Resource Recovery and Protection Plans § 3482.2 Action on plans. (a)(1) Exploration plans. The... with the approval terms of the exploration plan. (2) Resource recovery and protection plans. No resource recovery and protection plan or modification thereto shall be approved which is not in...

  17. 43 CFR 3482.2 - Action on plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Exploration and Resource Recovery and Protection Plans § 3482.2 Action on plans. (a)(1) Exploration plans. The... with the approval terms of the exploration plan. (2) Resource recovery and protection plans. No resource recovery and protection plan or modification thereto shall be approved which is not in...

  18. Affirmative Action Plan, October 1991--September 1992

    SciTech Connect

    Not Available

    1991-10-01

    This report documents Reynolds Electrical Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the Handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations. All personnel decisions are made at the Company level. Decisions regarding the General Manager or Deputy General Manager are made at the corporate level.

  19. The National Action Plan. Australian School Science Education National Action Plan, 2008-2012. Volume 1

    ERIC Educational Resources Information Center

    Goodrum, Denis; Rennie, Leonie J.

    2007-01-01

    In 2001, the Australian Government released a report, commissioned by the then Department of Education, Training and Youth Affairs, entitled "The Status and Quality of Teaching and Learning of Science in Australian Schools" (Goodrum, Hackling, & Rennie, 2001). Its recommendations included actions to address raising community…

  20. Corrective Action Investigation plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfield, Nevada Test Site, Nevada, March 1999

    SciTech Connect

    ITLV

    1999-03-01

    The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

  1. 40 CFR 281.35 - Release response and corrective action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... soil and ground water, and any nearby surface waters. The extent of soil and ground water contamination... from UST systems are cleaned up through soil and ground water remediation and any other steps, as... § 280.67, the state must notify the affected public of all confirmed releases requiring a plan for...

  2. 40 CFR 281.35 - Release response and corrective action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... soil and ground water, and any nearby surface waters. The extent of soil and ground water contamination... from UST systems are cleaned up through soil and ground water remediation and any other steps, as... § 280.67, the state must notify the affected public of all confirmed releases requiring a plan for...

  3. 40 CFR 281.35 - Release response and corrective action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... soil and ground water, and any nearby surface waters. The extent of soil and ground water contamination... from UST systems are cleaned up through soil and ground water remediation and any other steps, as... § 280.67, the state must notify the affected public of all confirmed releases requiring a plan for...

  4. Final voluntary release assessment/corrective action report

    SciTech Connect

    1996-11-12

    The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.

  5. Clean slate corrective action investigation plan

    SciTech Connect

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

  6. SADC establishes a regional action plan.

    PubMed

    Klouda, T

    1997-02-01

    The regional meeting held on AIDS strategy in Lilongwe, Malawi, in December, 1996, made important advances. The 12 countries of the SADC (Southern Africa Development Community) joined the European Union to institute a regional action plan for the reduction of susceptibility of people to HIV because of social, cultural, and environmental factors; the vulnerability of people with HIV infection to social and other difficulties; and the vulnerability of institutions because of the foregoing impacts. At the conference the issues explored were employment, mining, medical drugs, education, and tourism. An employment charter was seen as crucial for the success of AIDS and workplace activities. Facilitation of travel across borders was important for the reduction of susceptibility to HIV infection. Enhancement of regional policies for essential drugs was vital for drugs for the treatment of AIDS. The clarification of the regional role was critical for regional support of national action (strengthening technical and institutional capacities) and for regional joint action such as studies on research, harmonization of data collection on HIV/AIDS; organization of training; development of information and education on HIV/AIDS; facilitation of manufacturing of drugs and condoms; and the development of a regional information and education program about HIV/AIDS. The conference also clarified HIV/AIDS programs in relation to other health and socioeconomic problems.

  7. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 543: LIQUID DISPOSAL UNITS, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2006-09-01

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved Corrective Action Decision Document.

  8. 78 FR 42071 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance... the public comment period for the proposed guidance ``PAG Manual: Protective Action Guides (PAGs)...

  9. The Planner’s Role in the Civil-Military Relationship: Syrian Crisis Action Planning (2011-2013)

    DTIC Science & Technology

    2015-05-22

    Approved for Public Release; Distribution is Unlimited The Planner’s Role in the Civil-Military Relationship: Syrian Crisis Action Planning (2011...Civil-Military Relationship: Syrian Crisis Action Planning (2011-2013) 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6...SUPPLEMENTARY NOTES 14. ABSTRACT Crisis action planning (CAP) is the military process for resolving imminent and emerging crises. CAP activities

  10. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Consortia; Contents of Consolidated... to be undertaken to pursue its strategic plan. The consolidated plan must provide this...

  11. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  12. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  13. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  14. Plans and Social Actions. Technical Report No. 34.

    ERIC Educational Resources Information Center

    Bruce, Bertram

    Our understanding of a story is highly dependent upon our ability to recognize the underlying purpose for actions described in the story. We need to view those actions as steps in, or reactions to, plans. This paper sketches some of the components of a model for the understanding of plans and social actions. The model is first applied to narrative…

  15. Hazardous Waste Remedial Actions Program: Remedial Actions Planning Program Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1989-04-01

    The purpose of this Plan is to describe the quality assurance (QA) requirements for the RAP Program by identifying the quality elements to be controlled and specifying how they will be controlled. The activities for which control elements will be identified include those relating to: preparation, review, and approval of plans, reports, and studies; execution of field and analytical work by subcontractors and other agents; control of subcontractors and other agents during other phases of work; and actions internal to the RAP Program to ensure proper execution of projects.

  16. ORD Strategic Action Plan for Information Management / Information Technology 2011

    EPA Science Inventory

    ORD's Strategic Action Plan for IM/IT (2011) was collaboratively developed with input from ORD research and administrative personnel. It identifies actions necessary to support ORD's priority IM and IT needs.

  17. On the Inclusion of Externally Controlled Actions in Action Planning

    ERIC Educational Resources Information Center

    Tsai, Jessica Chia-Chin; Knoblich, Gunther; Sebanz, Natalie

    2011-01-01

    According to ideomotor theories, perceiving action effects produced by others triggers corresponding action representations in the observer. We tested whether this principle extends to actions performed by externally controlled limbs and tools. Participants performed a go-no-go version of a spatial compatibility task in which their own actions…

  18. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

  19. Corrective Action Investigation Plan for Corrective Action Unit 500: Test Cell A Septic System, Nevada Test Site, Nevada

    SciTech Connect

    IT Las Vegas

    1999-01-27

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s), and may include solid waste management units, individual disposal sites, or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP will be used in conjunction with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998c), hereafter referred to as the Leachfield Work Plan. Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. This CAIP contains CAU-specific information including a facility description, environmental sample collection objectives, and the criteria for conducting site investigation activities at CAU 500. This CAIP addresses one of three leachfield systems associated with Test Cell A, which is located in Area 25 at the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (see Leachfield Work Plan Figure 1-1). Corrective Action Unit 500 is comprised of the Test Cell A Septic System (CAS 25-04-05) and the associated leachfield system presented in Figure 1-1 (FFACO, 1996).

  20. Plan to mitigate infrastructure development released

    NASA Astrophysics Data System (ADS)

    Wendel, JoAnna

    2014-04-01

    Secretary of the Interior Sally Jewell released a new strategy on 10 April 2014 to advance landscape-scale, science-based management of America's public lands and wildlife. The strategy will implement mitigation policies and practices at the Department of the Interior that can encourage infrastructure development while protecting natural and cultural resources.

  1. Features of planned hand actions influence identification of graspable objects.

    PubMed

    Bub, Daniel N; Masson, Michael E J; Lin, Terry

    2013-07-01

    We demonstrate that constituents of motor actions associated with handled objects play a role in identifying such objects. Subjects held in working memory action plans for reaching movements; these action plans specified both the hand to be used (left or right) and a wrist orientation (vertical or horizontal). Speeded object identification was impaired when a pictured object matched the action on only one of these two categorical dimensions (e.g., a beer mug with its handle facing left, an action plan involving the right hand and vertical wrist orientation), relative to when the object matched the action on both dimensions or neither dimension. This result implies that identification of a manipulable object leads to automatic retrieval of matching features of a planned action along with nonmatching features to which they are bound. These discrepant features conflict with those of the target object, which results in delayed identification.

  2. Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1

    SciTech Connect

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

  3. Hanford emergency management plan - release 15

    SciTech Connect

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  4. Endomorphins: localization, release and action on rat dorsal horn neurons.

    PubMed

    Dun, N J; Dun, S L; Wu, S Y; Williams, C A; Kwok, E H

    2000-01-01

    Endomorphin (Endo) 1 and 2, two tetrapeptides isolated from the bovine and human brain, have been proposed to be the endogenous ligand for the mu-opiate receptor. A multi-disciplinary study was undertaken to address the issues of localization, release and biological action of Endo with respect to the rat dorsal horn. First, immunohistochemical studies showed that Endo-1- or Endo-2-like immunoreactivity (Endo-1- or Endo-2-LI) is selectively expressed in fiber-like elements occupying the superficial layers of the rat dorsal horn, which also exhibit a high level of mu-opiate receptor immunoreactivity. Second, release of immunoreactive Endo-2-like substances (irEndo) from the in vitro rat spinal cords upon electrical stimulation of dorsal root afferent fibers was detected by the immobilized antibody microprobe technique. The site of release corresponded to laminae I and II where the highest density of Endo-2-LI fibers was localized. Lastly, whole-cell patch clamp recordings from substantia gelatinosa (SG) neurons of rat lumbar spinal cord slices revealed two distinct actions of exogenous Endo-1 and Endo-2: (1) depression of excitatory and/or inhibitory postsynaptic potentials evoked by stimulation of dorsal root entry zone, and (2) hyperpolarization of SG neurons. These two effects were prevented by the selective mu-opiate receptor antagonist beta-funaltrexamine. The localization of endomorphin-positive fibers in superficial layers of the dorsal horn and the release of irEndo upon stimulation of dorsal root afferents together with the observation that Endo inhibits the activity of SG neurons by interacting with mu-opiate receptors provide additional support of a role of Endo as the endogenous ligand for the mu-opiate receptor in the rat dorsal horn.

  5. 12 CFR 704.10 - Investment action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Investment action plan. 704.10 Section 704.10... CREDIT UNIONS § 704.10 Investment action plan. (a) Any corporate credit union in possession of an investment, including a derivative, that fails to meet a requirement of this part must, within 30...

  6. 29 CFR 1910.38 - Emergency action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... action plan must include at a minimum: (1) Procedures for reporting a fire or other emergency; (2) Procedures for emergency evacuation, including type of evacuation and exit route assignments; (3) Procedures... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action...

  7. 29 CFR 1910.38 - Emergency action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... action plan must include at a minimum: (1) Procedures for reporting a fire or other emergency; (2) Procedures for emergency evacuation, including type of evacuation and exit route assignments; (3) Procedures... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action...

  8. Education for All: National Plan of Action, 2003-2015

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    Background: The Lao People's Democratic Republic (PDR) Education for All National Plan of Action (EFA NPA) for 2003-2015 seeks to accomplish three major tasks: equitable access, improved quality and relevance and strengthened education management. Purpose: To design a National Education For All Action Plan for basic education in Lao PDR which…

  9. Indiana's Comprehensive Action Plan for Adult Education Programs.

    ERIC Educational Resources Information Center

    Indiana State Dept. of Education, Indianapolis.

    Indiana's Comprehensive Action Plan (I-CAP) provides a framework for program excellence, accountability, and continuous improvement in adult education. The action plan includes guiding principles and benchmarks for quality programs. Adult education programs are evaluated annually on these 10 established principles of program quality: educational…

  10. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document is a compilation of different issues identified by the Tiger Teams at the several locations of the Sandia National Laboratory. In this volume there are findings/concerns and the resultant responses and planned actions for these issues. Also included are the schedules and costs for the planned actions.

  11. Adult Basic Skills: Developing a Local Action Plan.

    ERIC Educational Resources Information Center

    Basic Skills Agency, London (England).

    This document presents advice from the United Kingdom's Basic Skills Agency regarding developing local action plans. The first 20% of the document defines basic skills and discusses the following action plan components: (1) an estimate of the area's need for basic skills training; (2) a target to reduce the area's estimated scale of need; (3)…

  12. Clean Slate 1 Corrective Action Plan, Revision 0

    SciTech Connect

    1997-04-01

    This Corrective Action Plan (CAP) has been prepared to meet the requirements specified in the Federal Facility Agreement and Consent Order (FFACO, 1996). A Corrective Action Decision Document (CADD) (DOE, 1997) was submitted to the Nevada Department of Environmental Protection (NDEP) January 31, 1997 for the Clean Slate 1 (CS-1) Site in accordance with the Corrective Action Investigation Plan (CAIP) (DOE, 1996) and the Soils Media Operable Unit Quality Assurance Project Plan (DOE, 1995). The FFACO lists CS-1 as Corrective Action Unit (CAU) number 412.

  13. The role of action control and action planning on fruit and vegetable consumption.

    PubMed

    Zhou, Guangyu; Gan, Yiqun; Miao, Miao; Hamilton, Kyra; Knoll, Nina; Schwarzer, Ralf

    2015-08-01

    Globally, fruit and vegetable intake is lower than recommended despite being an important component to a healthy diet. Adopting or maintaining a sufficient amount of fruit and vegetables in one's diet may require not only motivation but also self-regulatory processes. Action control and action planning are two key volitional determinants that have been identified in the literature; however, it is not fully understood how these two factors operate between intention and behavior. Thus, the aim of the current study was to explore the roles of action control and action planning as mediators between intentions and dietary behavior. A longitudinal study with three points in time was conducted. Participants (N = 286) were undergraduate students and invited to participate in a health behavior survey. At baseline (Time 1), measures of intention and fruit and vegetable intake were assessed. Two weeks later (Time 2), action control and action planning were assessed as putative sequential mediators. At Time 3 (two weeks after Time 2), fruit and vegetable consumption was measured as the outcome. The results revealed action control and action planning to sequentially mediate between intention and subsequent fruit and vegetable intake, controlling for baseline behavior. Both self-regulatory constructs, action control and action planning, make a difference when moving from motivation to action. Our preliminary evidence, therefore, suggests that planning may be more proximal to fruit and vegetable intake than action control. Further research, however, needs to be undertaken to substantiate this conclusion.

  14. Smart Buildings: Business Case and Action Plan

    SciTech Connect

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  15. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... to be undertaken to pursue its strategic plan. The consolidated plan must provide this description... each individual community that is a member of the consortium. (Approved by the Office of Management...

  16. Integrated planning for United Action in Phase Zero

    DTIC Science & Technology

    2007-05-24

    Integrated Planning for Unified Action in Phase Zero A Monograph by MAJ Elizabeth A. Medina US Army School of Advanced Military...Monograph 3. DATES COVERED (From - To) July 2006 – Feb 2007 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Integrated Planning for Unified Action in...of the Department of Defense to plan for Phase 0 at the strategic and operational levels. This paper will answer whether DoD has a method for

  17. K basins interim remedial action health and safety plan

    SciTech Connect

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  18. Closure Report for Corrective Action Unit 340: NTS Pesticide Release Sites Nevada Test Site, Nevada

    SciTech Connect

    C. M. Obi

    2000-05-01

    The purpose of this report is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed in accordance with the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999) and consisted of clean closure by excavation and disposal. The Area 15 Quonset Hut 15-11 was formerly used for storage of farm supplies including pesticides, herbicides, and fertilizers. The Area 23 Quonset Hut 800 was formerly used to clean pesticide and herbicide equipment. Steam-cleaning rinsate and sink drainage occasionally overflowed a sump into adjoining drainage ditches. One ditch flows south and is referred to as the quonset hut ditch. The other ditch flows southeast and is referred to as the inner drainage ditch. The Area 23 Skid Huts were formerly used for storing and mixing pesticide and herbicide solutions. Excess solutions were released directly to the ground near the skid huts. The skid huts were moved to a nearby location prior to the site characterization performed in 1998 and reported in the Corrective Action Decision Document (CADD) (DOE, 1998). The vicinity and site plans of the Area 23 sites are shown in Figures 2 and 3, respectively.

  19. Corrective Action Investigation Plan for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David A. Strand

    2004-09-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 145: Wells and Storage Holes. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 145 is located in Area 3 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 145 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-20-01, Core Storage Holes; (2) 03-20-02, Decon Pad and Sump; (3) 03-20-04, Injection Wells; (4) 03-20-08, Injection Well; (5) 03-25-01, Oil Spills; and (6) 03-99-13, Drain and Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. One conceptual site model with three release scenario components was developed for the six CASs to address all releases associated with the site. The sites will be investigated based on data quality objectives (DQOs) developed on June 24, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQOs process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 145.

  20. National Action Plan for Energy Efficiency Report

    SciTech Connect

    National Action Plan for Energy Efficiency

    2006-07-01

    Summarizes recommendations, key barriers, and methods for energy efficiency in utility ratemaking as well as revenue requirements, resource planning processes, rate design, and program best practices.

  1. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action.

    PubMed

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations.

  2. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action

    PubMed Central

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations. PMID:27606968

  3. Nutrition Integrity in Action: Planning for Success.

    ERIC Educational Resources Information Center

    Stevenson, Peggy

    1994-01-01

    The Antioch Unified School District is one of several California schools testing a version of the Nutrient Standard Menu Planning (NSMP) to meet the new rules that require all schools to reduce the fat content of meals. NSMP, presently implemented at the elementary level, has increased flexibility in menu planning and led to better management and…

  4. Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada

    SciTech Connect

    Bechtel Nevada

    1998-08-31

    This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

  5. Environmental democracy in action: The Toxics Release Inventory

    NASA Astrophysics Data System (ADS)

    Lynn, Frances M.; Kartez, Jack D.

    1994-07-01

    The Toxics Release Inventory (TRI) created by the 1986 Emergency Planning and Community Right-to-Know Act initially received limited attention. During the early years of its implementation, the TRI has become the basis for a national experiment in voluntaristic problem solving among citizens and industry, but that process of environmental democracy hinges on citizens' ability to actually acquire, understand, and apply the new data on industrial toxic emissions. A national study of TRI-using organizations in the public and private sectors reveals that effective citizen access depends in part on the efforts of intermediary public interest groups to bridge individual needs and right-to-know data. Although the TRI has had early success as a supplement to conventional command and control regulation, questions exist about the extent to which state and federal government should or must provide special efforts to make environmental information access work for citizens.

  6. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... actions steps for reducing and ending homelessness through: (i) Reaching out to homeless persons... period of time that individuals and families experience homelessness, facilitating access for homeless... rent; mortgage and utility assistance payments to prevent homelessness of the individual or...

  7. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... permanent housing and independent living, specific action steps to end chronic homelessness, and to address... payments to prevent homelessness of the individual or family; tenant-based rental assistance; and...

  8. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... transition to permanent housing and independent living, specific action steps to end chronic homelessness... prevent homelessness of the individual or family; tenant-based rental assistance; and units provided...

  9. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... actions steps for reducing and ending homelessness through: (i) Reaching out to homeless persons... period of time that individuals and families experience homelessness, facilitating access for homeless... rent; mortgage and utility assistance payments to prevent homelessness of the individual or...

  10. Intrahypothalamic neuroendocrine actions of corticotropin-releasing factor.

    PubMed

    Almeida, O F; Hassan, A H; Holsboer, F

    1993-01-01

    Most studies of the neuroendocrine effects of corticotropin-releasing factor (CRF) have focused on its role in the regulation of the pituitary-adrenal axis; activation of this axis follows release of the peptide from CRF-containing terminals in the median eminence. However, a sizeable proportion of CRF fibres terminate within the hypothalamus itself, where synaptic contacts with other hypothalamic neuropeptidergic neurons (e.g. gonadotropin-releasing hormone-containing and opioidergic neurons) have been identified. Here, we summarize physiological and pharmacological data which provide insights into the nature and significance of these intrahypothalamic connections. It is now clear that CRF is a potent secretagogue of the three major endogenous opioid peptides (beta-endorphin, Met-enkephalin and dynorphin) and that it stimulates opioidergic neurons tonically. In the case of beta-endorphin, another hypothalamic peptide, arginine vasopressin, appears to be an essential mediator of CRF's effect, suggesting the occurrence of CRF synapses on, or in the vicinity of, vasopressin neurons; morphological support for this assumption is still wanting. Evidence for direct and indirect inhibitory effects of CRF on sexual behaviour and secretion of reproductive hormones is also presented; the indirect pathways include opioidergic neurons. An important conclusion from all these studies is that, in addition to its better known functions in producing adaptive responses during stressful situations, CRF might also contribute to the coordinated functioning of various components of the neuroendocrine system under basal conditions. Although feedback regulation of hypothalamic neuronal activity by peripheral steroids is a well-established tenet of endocrinology, data on modulation of the intrahypothalamic actions of CRF by adrenal and sex steroids are just emerging. Some of these newer findings may be useful in framing questions related to the mechanisms underlying disease states (such as

  11. USAF Affirmative Actions Plan. A Historical Perspective

    DTIC Science & Technology

    1984-04-01

    five target groups : Black, Hispanic, Other Racial Minority, Women, and Caucasian Male. This change provided a better analysis of affirmative actions for...Blacks and Other Racial Minorities and enabled a comparison between the minority target groups and the remainder of the Air Force population (i.e...Caucasian Male). Regarding this latter point, some field commanders contended that positive results in the affirmative action target groups were at the

  12. QUEST2: Release 1: Project plan deliverable set

    SciTech Connect

    Braaten, F.D.

    1995-02-10

    This Project Management Plan combines the project management deliverables from the P+ methodology which are applicable to Release 1 of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19.

  13. Chemical release and radiation effects experiment advanced planning and coordination

    NASA Technical Reports Server (NTRS)

    Vaughan, William W.; Alzmann, Melanie

    1991-01-01

    The efforts conducted to provide assessments and planning support for the Chemical Release and Radiation Effects Satellite (CRRES) Experiments are summarized. Included are activities regarding scientific working group and workshop development including the preparation of descriptive information on the CRRES Project.

  14. Chemical release and radiation effects experiment advanced planned

    NASA Technical Reports Server (NTRS)

    Vaughan, William W.; Alzmann, Melanie

    1990-01-01

    A summary of the efforts conducted to provide assessments and planning support for the Chemical Release and Radiation Experiment Satellite (CRRES) is reported. Included are activities regarding scientific working group and workshop development including the preparation of descriptive information on the CRRES project.

  15. Stage II Remedial Action Plan Deer Lake AOC

    EPA Pesticide Factsheets

    Michigan Department of Environmental Quality reports on actions taken that have resulted in the removal of two beneficial use impairments. Outlines plans to remove remaining BUI and to delist the Area Of Concern.

  16. Controlling Asthma New Guidelines. New Medications. New Action Plans.

    MedlinePlus

    ... version of this page please turn Javascript on. New Guidelines. New Medications. New Action Plans. People everywhere and in every age ... I am putting the finishing touches on my new studio album that we hope to have out ...

  17. Learning through Participatory Action Research for Community Ecotourism Planning.

    ERIC Educational Resources Information Center

    Guevara, Jose Roberto Q.

    1996-01-01

    Ecologically sound tourism planning and policy require an empowering community participation. The participatory action research model helps a community gain understanding of its social reality, learn how to learn, initiate dialog, and discover new possibilities for addressing its situation. (SK)

  18. Goal Reconstruction: How Teton Blends Situated Action and Planned Action

    DTIC Science & Technology

    1989-11-03

    5. Appendix: Teton 36 5.1. Knowledge representation 36 5.2. The execution cycle 37 5.3. Memories 39 Accssj-,n For NTIS 2A&I J, ’I, : t I .... J/J...Conclusions 35 5. Appendix: Teton 36 5.1. Knowledge representation 36 5.2. The execution cycle 37 5.3. Memories 39 When you purchase a programming language...inadequacies in current accounts of human working memory for goals. The third problem is that current accounts of problem solving overemphasize planning

  19. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding...) The developer shall report to the Corporation periodically its progress in meeting the goals and..., and committed opportunities. In meeting the reporting requirements the developer shall: (1) Count...

  20. The New Haven Department of Education Affirmative Action Plan 1974.

    ERIC Educational Resources Information Center

    New Haven Public Schools, CT.

    The New Haven public schools affirmative action report contains statements of purpose, policy, and responsibility in conjunction with a plan of action to ensure that job applicants and employees receive fair consideration without regard to their race, color, religion, sex, or national origin. The goals and timetables established will rectify…

  1. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  2. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 4 2011-07-01 2011-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  3. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 4 2014-07-01 2014-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  4. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 4 2012-07-01 2012-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  5. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  6. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  7. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  8. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  9. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  10. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  11. Climate Action Planning at the University of New Hampshire

    ERIC Educational Resources Information Center

    Cleaves, Sara M.; Pasinella, Brett; Andrews, Jennifer; Wake, Cameron

    2009-01-01

    Purpose: The purpose of this paper is to discuss the recent history of climate action planning at the University of New Hampshire (UNH), a public university with a long history of sustainability action and commitment. Items discussed include a partnership with Clean Air-Cool Planet (CA-CP) to produce a greenhouse gas (GHG) inventory tool that…

  12. Corrective Action Investigation Plan for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada, Rev. 0, Including Record of Technical Change No. 1

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-02-26

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 529, Area 25 Contaminated Materials, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 529 consists of one Corrective Action Site (25-23-17). For the purpose of this investigation, the Corrective Action Site has been divided into nine parcels based on the separate and distinct releases. A conceptual site model was developed for each parcel to address the translocation of contaminants from each release. The results of this investigation will be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  13. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... employees to respond to an emergency that is beyond the scope of the Emergency Action Plan developed in... train a sufficient number of persons to assist in the safe and orderly emergency evacuation of employees...: (A) Initially when the plan is developed; (B) Whenever the employee's responsibilities or...

  14. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or... action plans. (a) Scope and application. This section requires all employers to develop and implement an... employees must take to ensure employee safety from fire and other emergencies. 14 When an employer...

  15. 24 Command Fire Improvement Action Program Plan

    SciTech Connect

    GRIFFIN, G.B.

    2000-12-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

  16. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... local FSS program, and shall contain, at a minimum, the following information: (1) Family demographics. A description of the number, size, characteristics, and other demographics (including racial and... outreach efforts, to recruit FSS participants from among eligible families; and (ii) The PHA's actions...

  17. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... local FSS program, and shall contain, at a minimum, the following information: (1) Family demographics. A description of the number, size, characteristics, and other demographics (including racial and... outreach efforts, to recruit FSS participants from among eligible families; and (ii) The PHA's actions...

  18. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... local FSS program, and shall contain, at a minimum, the following information: (1) Family demographics. A description of the number, size, characteristics, and other demographics (including racial and... outreach efforts, to recruit FSS participants from among eligible families; and (ii) The PHA's actions...

  19. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... local FSS program, and shall contain, at a minimum, the following information: (1) Family demographics. A description of the number, size, characteristics, and other demographics (including racial and... outreach efforts, to recruit FSS participants from among eligible families; and (ii) The PHA's actions...

  20. Student-Industry Plan for Action.

    ERIC Educational Resources Information Center

    National Association of Manufacturers, New York, NY. Education Committee.

    The guidelines for a student-industry action committee represent an attempt by the authors to reverse the trend of mistrust demonstrated by the American public toward business and industry. Twelve chapter presidents of Delta Sigma Pi, a university business fraternity, met initially with representatives of the National Association of Manufacturers…

  1. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... goals and specific actions steps for reducing and ending homelessness through: (i) Reaching out to... shortening the period of time that individuals and families experience homelessness, facilitating access for... payments to prevent homelessness of the individual or family; tenant-based rental assistance; and...

  2. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... actions steps for reducing and ending homelessness through: (i) Reaching out to homeless persons... period of time that individuals and families experience homelessness, facilitating access for homeless... homelessness of the individual or family; tenant-based rental assistance; and units provided in...

  3. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... goals and specific actions steps for reducing and ending homelessness through: (i) Reaching out to... shortening the period of time that individuals and families experience homelessness, facilitating access for... prevent homelessness of the individual or family; tenant-based rental assistance; and units provided...

  4. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... goals and specific actions steps for reducing and ending homelessness through: (i) Reaching out to... shortening the period of time that individuals and families experience homelessness, facilitating access for... prevent homelessness of the individual or family; tenant-based rental assistance; and units provided...

  5. White House Climate Action Plan Hotly Debated in Senate Hearing

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2014-01-01

    Emotions ran high among senators at a 16 January U.S. Senate hearing on the White House's Climate Action Plan; the hearing included administration officials and other supporters of the plan as well as opponents. The plan, which President Barack Obama presented in June 2013 (see Eos, 94(27), 239, doi:10.1002/2013EO270003), calls for cutting carbon pollution, preparing the nation for the impacts of climate change, and leading international efforts to address climate change.

  6. Hawaii's Adolescent Wellness Plan: Laulima in Action.

    ERIC Educational Resources Information Center

    Hawaii State Dept. of Health, Honolulu.

    Based on a need in Hawaii for a multilevel responsibility and commitment to ensure adolescent wellness, the Hawaii Adolescent Wellness Team developed a plan based on research and discussions with a variety of professionals and community leaders in health, education, and social service. This resource handbook is designed to assist communities in…

  7. Action Planning in Young Children's Tool Use

    ERIC Educational Resources Information Center

    Cox, Ralf F. A.; Smitsman, Ad W.

    2006-01-01

    Tool use consists of at least two coupled phases of activities, involving multi-step problem solving. It therefore provides an interesting window on the development of planning in goal-directed behavior. This study investigated 2-year-olds' and 3-year-olds' hand use in picking up and subsequently using a tool for displacing a target-object towards…

  8. Monitoring the Curriculum: From Plan to Action.

    ERIC Educational Resources Information Center

    Maglaras, Tom; Lynch, Deborah

    1988-01-01

    The Aurora Public School System (Colorado) has devised a plan to ensure implementation of the adopted curriculum. By developing a program monitoring process and incorporating it in a handbook, staff can rate their behavior and use "green flags" or "red alerts" to characterize subject area strengths and deficiencies. (MLH)

  9. Building air quality: Action plan, June 1998

    SciTech Connect

    1998-11-01

    To promote the use of these straightforward practices to improve IAQ, EPA and other leaders in the IAQ field developed this 8-step plan. This additional resource meets the needs of building owners and managers who want an easy-to-understand path for taking their building from current conditions and practices to the successful institutionalization of good IAQ management practices.

  10. Action Planning: Rowing in the Same Direction

    ERIC Educational Resources Information Center

    Hewson, Kurtis; Adrian, Lorna

    2008-01-01

    Two years ago, as Claresholm Elementary School prepared for a new year with a new principal, it had the usual shopping list of ambitions--focus on student learning, support the staff, empower parents, and more. However, in examining the school's improvement plan it became apparent that the school staff had a unique opportunity to develop solid…

  11. Corrective Action Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-10-01

    Corrective Action Unit (CAU) 166, Storage Yards and Contaminated Materials, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 166 consists of seven Corrective Action Sites (CASs) located in Areas 2, 3, 5, and 18 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada (Figure 1). CAU 166 consists of the following CASs: (1) CAS 02-42-01, Cond. Release Storage Yd - North; (2) CAS 02-42-02, Cond. Release Storage Yd - South; (3) CAS 02-99-10, D-38 Storage Area; (4) CAS 03-42-01, Conditional Release Storage Yard; (5) CAS 05-19-02, Contaminated Soil and Drum; (6) CAS 18-01-01, Aboveground Storage Tank; and (7) CAS 18-99-03, Wax Piles/Oil Stain. Details of the site history and site characterization results for CAU 166 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007).

  12. Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0

    SciTech Connect

    Susan Evans

    2004-11-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release

  13. McClellan AFB Management Action Plan (MAP) submittal

    SciTech Connect

    Not Available

    1992-12-23

    This Management Action Plan ('Action Plan' or 'MAP') contains a status summary of the McClellan Air Force Base (McAFB) environmental restoration and compliance programs and presents a comprehensive strategy for implementing response actions necessary to protect human health and the environment. This strategy integrates activities under both the Installation Restoration Program (IRP) and the Environmental Compliance Program (ECP). This Action Plan is a dynamic document that will be updated on a regular basis using the change-a-page looseleaf binder concept for day-to-day revisions along with a subsection at the end of each chapter to highlight any modifications or innovations since the previous major annual review/update.

  14. Corrective Action Decision Document/Closure Report for Corrective Action Unit 546: Injection Well and Surface Releases Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Alfred Wickline

    2008-12-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 546, Injection Well and Surface Releases, at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit (CAU) 546 is comprised of two corrective action sites (CASs): • 06-23-02, U-6a/Russet Testing Area • 09-20-01, Injection Well The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 546. To achieve this, corrective action investigation (CAI) activities were performed from May 5 through May 28, 2008, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 546: Injection Well and Surface Releases, Nevada Test Site, Nevada (NNSA/NSO, 2008). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether a contaminant of concern is present at a given CAS. • Determine whether sufficient information is available to evaluate potential corrective action alternatives at each CAS. The CAU 546 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Because DQO data needs were met, and corrective actions have been implemented, it has been determined that no further corrective action (based on risk to human receptors) is necessary for the CAU 546 CASs. The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective actions are needed for CAU 546 CASs. • No Corrective Action Plan is required. • A Notice of Completion to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site

  15. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    SciTech Connect

    D. H. Cox

    2000-07-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved.

  16. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... Management of Infertility. The draft plan can be found at http://www.regulations.gov Docket No. CDC-2012-0004... for the Prevention, Detection, and Management of Infertility, which was subsequently developed...

  17. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Matthews, Patrick

    2016-02-01

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) were evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.

  18. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...-year action plan). (a) Submission. As soon as possible after modernization funds first become available... components of the comprehensive plan. The meeting shall be open to all residents and duly elected resident... addition, the PHA shall identify the funds or other resources in the consolidated plan that are to be...

  19. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons Nevada Test Site, Nevada

    SciTech Connect

    DOE /NV Operations Office

    1999-05-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and criteria for conducting site investigation activities at CAU 232, Area 25 Sewage Lagoons. Corrective Action Unit 232 consists of CAS 25-03-01, Sewage Lagoon, located in Area 25 of the Nevada Test Site (NTS). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Area 25 Sewage Lagoons (Figure 1-2) (IT, 1999b) are located approximately 0.3 mi south of the Test Cell 'C' (TCC) Facility and were used for the discharge of sanitary effluent from the TCC facility. For purposes of this discussion, this site will be referred to as either CAU 232 or the sewage lagoons.

  20. Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks Nevada Test Site, Nevada

    SciTech Connect

    U.S. Department of Energy, Nevada Operations Office

    1999-05-05

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 135, Area 25 Underground Storage Tanks (USTs), which is located on the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada.

  1. Corrective Action Investigation Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada

    SciTech Connect

    DOE /NV

    1999-01-25

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 240, Area 25 Vehicle Washdown, which is located on the Nevada Test Site (NTS).

  2. Action plans can interact to hinder or facilitate reach performance.

    PubMed

    Fournier, Lisa R; Wiediger, Matthew D; Taddese, Ezana F

    2015-11-01

    Executing a reach action can be delayed while retaining another action in working memory (WM) if the two action plans partly overlap rather than do not overlap. This delay (partial repetition cost) occurs when reach responses are under cognitive control. In this study, we investigated whether facilitation (a partial repetition benefit) occurs when reach responses are automatic. We also examined whether the hemisphere controlling the limb or selection of the preferred limb (based on a free-reach task) influences reach performance when the actions partly overlap. Left- and right-handers reached to different stimulus locations to the left and right of body midline with their ipsilateral hand while maintaining an action plan in WM that required the same or the different hand. The results showed a partial repetition benefit for spatially compatible reaches to left and right stimulus locations far from the body midline, but not for those near the body midline. Also, no partial repetition cost was found at any of the stimulus-reach locations. This indicates that automatic reach responses that partly overlap with an action plan maintained in WM are not delayed, but instead can be facilitated (partial repetition benefit). The roles of hemisphere and reach-hand preference in action control and the importance of the degree of feature overlap in obtaining a partial repetition benefit (and cost) are discussed.

  3. Global tropospheric chemistry: A plan for action

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Prompted by an increasing awareness of the influence of human activity on the chemistry of the global troposphere, a panel was formed to (1) assess the requirement for a global study of the chemistry of the troposphere; (2) develop a scientific strategy for a comprehensive plan taking into account the existing and projected programs of the government; (3) assess the requirements of a global study in terms of theoretical knowledge, numerical modeling, instrumentation, observing platforms, ground-level observational techniques, and other related needs; and (4) outline the appropriate sequence and coordination required to achieve the most effective utilization of available resources. Part 1 presents a coordinated national blueprint for scientific investigations of biogeochemical cycles in the global troposphere. part 2 presents much of the background information of the present knowledge and gaps in the understanding of tropospheric chemical cycles and processes from which the proposed program was developed.

  4. The U.S. climate change action plan: Challenges and prospects

    SciTech Connect

    Darmstadter, J.

    1995-07-01

    In 1992, the United States and 154 other countries signed the United Nations Framework Convention on Climate Change, an international accord outlining measures for dealing with the threat of global warming. The following year, the Clinton administration released its Climate Change Action Plan for meeting the convention`s goal of stabilizing emissions of carbon dioxide and other greenhouse gases at 1990 levels by the year 2000. Evaluation of the plan`s prospects for success must necessarily be speculative at this point, but already several of the assumptions on which the plan is predicated appear questionable. Moreover, even if the emissions stabilization goal is met, the problem of global warming will persist. Therefore, the greatest contribution of the plan might be to raise consciousness about the need for sustained measures to address climate change and its attendant socioeconomic consequences.

  5. Water supply planning under interdependence of actions: Theory and application

    NASA Astrophysics Data System (ADS)

    Rajabi, S.; Hipel, K. W.; Kilgour, D. M.

    1999-07-01

    An ongoing water supply planning problem in the Regional Municipality of Waterloo, Ontario, Canada, is studied to select the best water supply combination, within a multiple-objective framework, when actions are interdependent. The interdependencies in the problem are described and shown to be essential features. The problem is formulated as a multiple-criteria integer program with interdependent actions. Because of the large number of potential actions and the nonconvexity of the decision space, it is quite difficult to find nondominated subsets of actions. Instead, a modified goal programming technique is suggested to identify promising subsets. The appropriateness of this technique is explained, and the lessons learned in applying it to the Waterloo water supply planning problem are described.

  6. Preparing US community greenhouse gas inventories for climate action plans

    NASA Astrophysics Data System (ADS)

    Blackhurst, Michael; Matthews, H. Scott; Sharrard, Aurora L.; Hendrickson, Chris T.; Lima Azevedo, Inês

    2011-07-01

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  7. Looking at the formulation of national biosecurity education action plans.

    PubMed

    Sture, J; Minehata, M; Shinomiya, N

    2012-01-01

    In order for states to be assured of their compliance with the requirements of the Biological and Toxin Weapons Convention, it is necessary that all those science and policy stakeholders working within that state should be aware of their responsibilities under the Convention. This can only be achieved through a comprehensive national biosecurity education programme. We propose that each state should produce a national biosecurity action plan, with accompanying resources and materials to achieve this. A number of resources are already available online to support states in this challenge. We present a model for a national biosecurity action plan and propose a number of ways in which this may be achieved.

  8. Army Task Force on Behavioral Health: Corrective Action Plan

    DTIC Science & Technology

    2013-01-01

    will interface with the VA system and will be fully operational by 2017 . 5. MEDCOM is in the final stages of an OSC Concept Plan to be sent to DCS G-3...system testing at multiple sites, and the agencies must demonstrate significant single-site operations by 2014. Entire system field- ing is set for 2017 ...additional courses of action. The other courses of action included continuing the status quo with maxi - mum utilization of Reservists or partially

  9. Environmental Release Prevention and Control Plan (ERP and CP) annual review and update for 1993

    SciTech Connect

    Jannik, G.T.; Mamatey, A.; Arnett, M.

    1993-10-05

    In the Environmental Release Prevention and Control Plan (ERP and CP), WSRC made a commitment to conduct the following follow-up activities and actions: (1) Complete the action items developed in response to the findings and recommendation of the Environmental Release Prevention Taskteam (WSRC-RP-92-356). (2) Complete all batch and continuous release procedure revisions to incorporate the attributes that WSRC senior management required of each procedure. (3) DOE-SR Assistance Managers and WSRC counterparts to reach consensus and closure on the identified engineered solutions documented in the ERP and CP, develop and drive implementation of facility changes per the agreements. (4) Continue to analyze releases and monitor performance in accordance with the ERP and CP, and utilize the ALARA Release Guides Committee to drive improvements. (5) Conduct annual re-evaluations of the cost benefit analyses of the identified engineered solutions, and identify new options and alternatives for each outfall in response to site mission and facility changes. This report documents the efforts that have been completed over the past year in response to these commitments.

  10. 76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... QUALITY National Ocean Council; Strategic Action Plan Content Outlines AGENCY: Council on Environmental Quality. ACTION: Notice of Availability, Strategic Action Plan Content Outlines; Request for Comments... priority objectives. As a first step, Federal interagency writing teams have developed content outlines...

  11. Global Change Research Program releases new strategic plan

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-05-01

    Global Change Research Program releases new strategic plan A new 10-year strategic plan released by the United States Global Change Research Program (USGCRP) on 27 April calls for the federal interagency program to focus on four key goals during 2012-2021 to coordinate federal research efforts related to global change. The goals include advancing scientific knowledge of the integrated natural and human components of the Earth system; providing the scientific basis to inform and enable timely decisions on adaptation and mitigation; building sustained assessment capacity that improves the nation's ability to understand, anticipate, and respond to global change impacts and vulnerabilities; and advancing communications and education to broaden understanding of global change and develop the scientific workforce of the future. The goals and related objectives “recognize that to respond effectively to global change will require a deep understanding of the integrated Earth system—an understanding that incorporates physical, chemical, biological and behavioral information,” the plan states. “It is no longer enough to study the isolated physical, chemical, and biological factors affecting global change,” said USGCRP executive director Tom Armstrong.

  12. Corrective Action Investigation Plan for Corrective Action Unit 542: Disposal Holes, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    Laura Pastor

    2006-05-01

    Corrective Action Unit (CAU) 542 is located in Areas 3, 8, 9, and 20 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 542 is comprised of eight corrective action sites (CASs): (1) 03-20-07, ''UD-3a Disposal Hole''; (2) 03-20-09, ''UD-3b Disposal Hole''; (3) 03-20-10, ''UD-3c Disposal Hole''; (4) 03-20-11, ''UD-3d Disposal Hole''; (5) 06-20-03, ''UD-6 and UD-6s Disposal Holes''; (6) 08-20-01, ''U-8d PS No.1A Injection Well Surface Release''; (7) 09-20-03, ''U-9itsy30 PS No.1A Injection Well Surface Release''; and (8) 20-20-02, ''U-20av PS No.1A Injection Well Surface Release''. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 30, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 542. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the CAI for CAU 542 includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling. (2) Conduct radiological surveys. (3) Conduct geophysical surveys to

  13. Corrective Action Decision Document for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada, Revision 0 with Errata

    SciTech Connect

    Boehlecke, Robert

    2004-11-01

    This Corrective Action Decision Document (CADD) has been prepared for Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site (NTS), Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S Department of Defense (FFACO, 1996). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 536 is comprised of a single Corrective Action Site (CAS), 03-44-02, Steam Jenny Discharge, and is located in Area 3 of the NTS (Figure 1-2). The CAU was investigated in accordance with the Corrective Action Investigation Plan (CAIP) and Record of Technical Change (ROTC) No. 1 (NNSA/NV, 2003). The CADD provides or references the specific information necessary to support the recommended corrective action alternative selected to complete closure of the site. The CAU 536, Area 3 Release Site, includes the Steam Jenny Discharge (CAS 03-44-02) that was historically used for steam cleaning equipment in the Area 3 Camp. Concerns at this CAS include contaminants commonly associated with steam cleaning operations and Area 3 Camp activities that include total petroleum hydrocarbons (TPH), unspecified solvents, radionuclides, metals, and polychlorinated biphenyls (PCBs). The CAIP for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada (NNSA/NV, 2003), provides additional information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for the CAS within CAU 536. The evaluation of corrective action alternatives is based on process knowledge and the results of the investigative activities conducted in accordance with the CAIP (NNSA/NV, 2003) that was approved prior to the start of the

  14. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... continuation of generation of electric power at the project during or following an accident or other incident... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY...

  15. State Action Plan for Iowa. "Marketing" Marketing Education.

    ERIC Educational Resources Information Center

    Omega Group, Inc., Haverford, PA.

    An Iowa project identified curriculum, program standards, and a framework for promoting marketing education programs. The mission for the state action plan for marketing education is to develop a strategy to revitalize Iowa's marketing education for the 21st century. Three goals support this mission: (1) create a community-wide awareness of the…

  16. Awarding Educational Credit for CETA Training: A Plan of Action.

    ERIC Educational Resources Information Center

    Sullins, W. Robert; And Others

    A project was conducted to determine problems or barriers prohibiting awarding credit for Comprehensive Employment and Training Act (CETA) training in Virginia. Potential solutions and strategies for their implementation were to be identified. A variety of methods were used to obtain information required to produce a Plan of Action that presents…

  17. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100...

  18. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100...

  19. Long-Chain Perfluorinated Chemicals (PFCs) Action Plan

    EPA Pesticide Factsheets

    This Action Plan is based on EPA’s initial review of readily available use, exposure, and hazard information on PFCs. EPA considered which of the various authorities provided under TSCA and other statutes might be appropriate to address potential concerns.

  20. 24 CFR 248.135 - Plans of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., including the identity of the transferee and a copy of any documents of sale; (5) An income profile of the... median income limits established by the Commissioner in February 1987), or if the January 1, 1987 profile... OF LOW INCOME HOUSING MORTGAGES Prepayments and Plans of Action Under the Low Income...

  1. Creating a Global Agenda: Assessments, Solutions, and Action Plans.

    ERIC Educational Resources Information Center

    Didsbury, Howard F., Jr., Ed.

    Designed for educational policymakers and researchers, this volume on global issues is divided into four sections. The four essays in the first section, "Reducing the Nuclear Peril," offer a brief documentary survey and then present practical suggestions and action plans to reduce the nuclear threat. The eight papers in the second…

  2. Noise action plan of agglomerations: sustainable hypothesis or utopy?

    PubMed

    Magri, S L; Masera, S; Fogola, J

    2009-12-01

    European and Italian laws establish that agglomerations of more than 100 000 inhabitants must adopt an action plan in order to manage noise issues and effects. The plan aim is to reduce population exposure to environmental noise, which is defined as the outdoor sound created by human activities, including noise emitted by road traffic, rail traffic and air traffic, and noise from sites of industrial activity. Although acoustic pollution represents one of the main causes of annoyance for inhabitants of urban areas, the political agenda does not acknowledge it among the main environmental issues. Thus, acoustic reclamation is often considered a duty to be accomplished rather than a way to improve quality of life for citizens. Furthermore, financial resources are generally very poor while the acoustic critical situations are numerous and serious in terms of exceeding the limit. In this situation, what is the meaning of an urban area noise action plan? What are the concrete actions that municipalities can realise to reduce urban noise pollution? This study tries to answer these questions, starting from the analysis carried out for the action plan of the city of Turin.

  3. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... bid specifications in accordance with paragraph (b)(1) of this section. (2) Each contractor and... specifications for all bids for contracts in the amount of $50,000 or more, that all bidders which have, or would... action plan consistent with paragraphs (c) (1) and (2) of this section prior to bidding, unless...

  4. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex,...

  5. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex,...

  6. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex,...

  7. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income... regulatory agreement, which may include a request for incentives to extend the low income use of the housing... proposed changes in the low income affordability restrictions; (4) A description of any proposed changes...

  8. National Action Plan for the Prevention of Playground Injuries.

    ERIC Educational Resources Information Center

    Thompson, Donna; Hudson, Susan

    Recognizing the need for a nationally coordinated effort to reduce playground injuries, the National Program for Playground Safety was created in 1995. This booklet describes the national action plan for prevention of playground injuries. Designed for use by parents, teachers, recreation and park personnel, and caregivers involved in providing…

  9. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  10. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  11. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  12. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  13. Action Plan for the Development of Civic Morality

    ERIC Educational Resources Information Center

    Chinese Education and Society, 2006

    2006-01-01

    This paper discusses the action plan for the development of civic morality. Here, the importance, substance, ideology and policy principles guiding the development of civic morality is elaborated. In order to strengthen the development of civic morality, it is a must to adapt to the requirements of the developing situation; seize good…

  14. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... additional information or to develop and submit a corrective action plan for responding to contaminated soils... responding to contaminated soil and ground water. In either case, owners and operators are responsible for... residual contamination on nearby surface water and ground water; (5) An exposure assessment; and (6)...

  15. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency... route assignments; (ii) Procedures to be followed by employees who remain to operate critical plant... area. (4) Evacuation. The employer shall establish the types of evacuation to be used in...

  16. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency... route assignments; (ii) Procedures to be followed by employees who remain to operate critical plant... area. (4) Evacuation. The employer shall establish the types of evacuation to be used in...

  17. A national action plan for workforce development in behavioral health.

    PubMed

    Hoge, Michael A; Morris, John A; Stuart, Gail W; Huey, Leighton Y; Bergeson, Sue; Flaherty, Michael T; Morgan, Oscar; Peterson, Janice; Daniels, Allen S; Paris, Manuel; Madenwald, Kappy

    2009-07-01

    Across all sectors of the behavioral health field there has been growing concern about a workforce crisis. Difficulties encompass the recruitment and retention of staff and the delivery of accessible and effective training in both initial, preservice training and continuing education settings. Concern about the crisis led to a multiphased, cross-sector collaboration known as the Annapolis Coalition on the Behavioral Health Workforce. With support from the Substance Abuse and Mental Health Services Administration, this public-private partnership crafted An Action Plan for Behavioral Health Workforce Development. Created with input from a dozen expert panels, the action plan outlines seven core strategic goals that are relevant to all sectors of the behavioral health field: expand the role of consumers and their families in the workforce, expand the role of communities in promoting behavioral health and wellness, use systematic recruitment and retention strategies, improve training and education, foster leadership development, enhance infrastructure to support workforce development, and implement a national research and evaluation agenda. Detailed implementation tables identify the action steps for diverse groups and organizations to take in order to achieve these goals. The action plan serves as a call to action and is being used to guide workforce initiatives across the nation.

  18. Evaluation criteria for communications-related corrective action plans

    SciTech Connect

    1997-02-01

    This document provides guidance and criteria for US Nuclear Regulatory Commission (NRC) personnel to use in evaluating corrective action plans for nuclear power plant communications. The document begins by describing the purpose, scope, and applicability of the evaluation criteria. Next, it presents background information concerning the communication process, root causes of communication errors, and development and implementation of corrective actions. The document then defines specific criteria for evaluating the effectiveness of the corrective action plan, interview protocols, and an observation protocol related to communication processes. This document is intended only as guidance. It is not intended to have the effect of a regulation, and it does not establish any binding requirements or interpretations of NRC regulations.

  19. Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-06-01

    Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): {sm_bullet} CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536 Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure

  20. 29 CFR Appendix to Subpart E of... - Exit Routes, Emergency Action Plans, and Fire Prevention Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 5 2011-07-01 2011-07-01 false Exit Routes, Emergency Action Plans, and Fire Prevention..., and Fire Prevention Plans This appendix serves as a nonmandatory guideline to assist employers in.... Fire prevention housekeeping. The standard calls for the control of accumulations of flammable...

  1. Central effects of growth hormone-releasing hexapeptide (GHRP-6) on growth hormone release are inhibited by central somatostatin action.

    PubMed

    Fairhall, K M; Mynett, A; Robinson, I C

    1995-03-01

    Growth hormone (GH) release is stimulated by a variety of synthetic secretagogues, of which growth hormone-releasing hexapeptide (GHRP-6) has been most thoroughly studied; it is thought to have actions at both pituitary and hypothalamic sites. To evaluate the central actions of this peptide, we have studied GH release in response to direct i.c.v. injections in anaesthetized guinea pigs. GHRP-6 (0.04-1 microgram) stimulated GH release > 10-fold 30-40 min after i.c.v. injection. The same GH response required > 20-fold more GHRP-6 when given by i.v. injection. GH release could also be elicited by a non-peptide GHRP analogue (L-692,585, 1 microgram i.c.v.), whereas a growth hormone-releasing factor (GRF) analogue (human GRF27Nle(1-29)NH2, 2 micrograms, i.c.v.) was ineffective. A long acting somatostatin analogue (Sandostatin, SMS 201-995, 10 micrograms i.c.v.) (SMS) given 20 min before 200 ng GHRP-6 blocked GH release. This was unlikely to be due to a direct effect of SMS leaking out to the pituitary, since central SMS injections did not affect basal GH release, nor did they block GH release in response to i.v. GRF injections. We conclude that the hypothalamus is a major target for GHRP-6 in vivo. Since the GH release induced by central GHRP-6 injections can be inhibited by a central action of somatostatin, and other data indicate that GHRP-6 activates GRF neurones, we suggest that somatostatin may block this activation via receptors known to be located on or near the GRF cells themselves. Somatostatin may therefore be a functional antagonist of GHRP-6 acting centrally, as well as at the pituitary gland.

  2. Corrective action investigation plan for the Roller Coaster RADSAFE Area, Corrective Action Unit 407, Tonopah Test Range, Nevada

    SciTech Connect

    1998-04-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. CAUs consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU No. 407, the Roller Coaster RADSAFE Area (RCRSA) which is located on the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range Complex, is approximately 255 km (140 mi) northwest of Las Vegas, Nevada. CAU No. 407 is comprised of only one CAS (TA-23-001-TARC). The RCRSA was used during May and June 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The surface and subsurface soils are likely to have been impacted by plutonium and other contaminants of potential concern (COPCs) associated with decontamination activities at this site. The purpose of the corrective action investigation described in this CAIP is to: identify the presence and nature of COPCs; determine the vertical and lateral extent of COPCs; and provide sufficient information and data to develop and evaluate appropriate corrective actions for the CAS.

  3. Corrective action investigation plan for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada

    SciTech Connect

    1998-03-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 342, the Area 23 Mercury Fire Training Pit (FTP), which is located in Area 23 at the Nevada Test Site (NTS). The NTS is approximately 88 km (55 mi) northwest of Las Vegas, Nevada. Corrective Action Unit 342 is comprised of CAS 23-56-01. The FTP is an area approximately 100 m by 140 m (350 ft by 450 ft) located west of the town of Mercury, Nevada, which was used between approximately 1965 and 1990 to train fire-fighting personnel (REECo, 1991; Jacobson, 1991). The surface and subsurface soils in the FTP have likely been impacted by hydrocarbons and other contaminants of potential concern (COPC) associated with burn activities and training exercises in the area.

  4. Developing the 2012 national action plan for protecting children in agriculture.

    PubMed

    Lee, Barbara C; Gallagher, Susan S; Liebman, Amy K; Miller, Mary E; Marlenga, Barbara

    2012-01-01

    In 1996 the US launched a National Childhood Agricultural Injury Prevention Initiative, guided by an action plan generated by a 42-member multidisciplinary committee. A major update to the plan was released following the 2001 Summit on Childhood Agricultural Injury Prevention. From the year 2010 through 2011 a comprehensive assessment of progress to date was conducted followed by the drafting, review and finalizing of a new action plan-"The 2012 Blueprint for Protecting Children in Agriculture." This paper briefly describes the purpose and process for generating the new action plan then provides a listing of the 7 goals and 26 strategies within the plan. These goals and strategies account for trends in childhood agricultural injuries, changes in agricultural production and the demographics of its workforce, effectiveness of interventions, and the increasing use of social media, marketing and social networking. Primary funding for this project was provided by the National Institute for Occupational Safety and Health (NIOSH), which continues to serve as the lead federal agency for the national initiative.

  5. Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Alfred Wickline

    2009-04-01

    Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

  6. Observing end-state comfort favorable actions does not modulate action plan recall.

    PubMed

    Seegelke, Christian

    2015-01-01

    A large corpus of work demonstrates that observing other people's actions activates corresponding motor representations in the observer by running an internal simulation of the observed action. Recent evidence suggests that recalled action plans reflect a plan of how the observer would execute that action (based on the specific motor representation) rather than a plan of the actually observed action (based on the visual representation). This study examined whether people would recall an action plan based on a visual representation if the observed movement is biomechanically favorable for their own subsequent action. Participants performed an object manipulation task alongside a confederate. In the intra-individual task, the participant (or confederate) transported a plunger from an outer platform of fixed height to a center target platform located at different heights (home-to-target move), and then the same person transported the plunger back to the outer platform (target-back-to-home move). In the inter-individual task, the sequence was split between the two persons such that the participant (or confederate) performed the home-to-target move and the other person performed the target-back-to-home move. Importantly, the confederate always grasped the plunger at the same height. This grasp height was designated such that if participants would copy the action (i.e., grasp the object at the same height) it would place the participant's arm in a comfortable position at the end of the target-back-to-home move (i.e., end-state comfort). Results show that participants' grasp height was inversely related to center target height and similar regardless of direction (home-to-target vs. target-back-to-home move) and task (intra- vs. inter-individual). In addition, during the inter-individual task, participant's target-back-to-home grasp height was correlated with their own, but not with the confederate's grasp height during the home-to-target moves. These findings provide

  7. Observing end-state comfort favorable actions does not modulate action plan recall

    PubMed Central

    Seegelke, Christian

    2015-01-01

    A large corpus of work demonstrates that observing other people’s actions activates corresponding motor representations in the observer by running an internal simulation of the observed action. Recent evidence suggests that recalled action plans reflect a plan of how the observer would execute that action (based on the specific motor representation) rather than a plan of the actually observed action (based on the visual representation). This study examined whether people would recall an action plan based on a visual representation if the observed movement is biomechanically favorable for their own subsequent action. Participants performed an object manipulation task alongside a confederate. In the intra-individual task, the participant (or confederate) transported a plunger from an outer platform of fixed height to a center target platform located at different heights (home-to-target move), and then the same person transported the plunger back to the outer platform (target-back-to-home move). In the inter-individual task, the sequence was split between the two persons such that the participant (or confederate) performed the home-to-target move and the other person performed the target-back-to-home move. Importantly, the confederate always grasped the plunger at the same height. This grasp height was designated such that if participants would copy the action (i.e., grasp the object at the same height) it would place the participant’s arm in a comfortable position at the end of the target-back-to-home move (i.e., end-state comfort). Results show that participants’ grasp height was inversely related to center target height and similar regardless of direction (home-to-target vs. target-back-to-home move) and task (intra- vs. inter-individual). In addition, during the inter-individual task, participant’s target-back-to-home grasp height was correlated with their own, but not with the confederate’s grasp height during the home-to-target moves. These findings

  8. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    SciTech Connect

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action.

  9. The Newcastle (Australia) Airshed Management Action Plan (NAMAP)

    SciTech Connect

    Bridgman, H.A.; Cameron, C.

    1999-07-01

    The Newcastle (NSW Australia) Airshed Management Action Plan (NAMAP) has recently been completed, and is a forerunner toward urban air pollution management in Australia. NAMAP was developed by the Newcastle City Council in partnership with the community, science, and industry, as part of Council's commitments in it's environmental plan. Its purpose is to provide action strategies which will lead to improvements in Newcastle's air quality for future generations. Key issues addressed in the plan include: minimizing industrial emissions; reducing growth of vehicle kilometers traveled; improving energy efficiency; managing air quality from small and medium enterprises; reducing the impacts of solid fuel burning; improving management from councils own activities; making motor vehicle run clean; reviewing performance; and developing better solutions. Management strategies include community education, land use planning, regulation, economic incentives, monitoring, performance indicators and reporting. This paper describes the structure and development of NAMAP through stages from understanding the air pollution problem to recommending of action strategies for reduction and control. The development and implementation of NAMAP is particularly important as major changes in Newcastle's heavy industrial base will occur in the future, creating a restructuring in the relative importance of sources and primary emissions. NAMAP provides an excellent example of a cooperative effort to minimize air pollution problems in a small city.

  10. Affirmative Action Plans, January 1, 1994--December 31, 1994. Revision

    SciTech Connect

    Not Available

    1994-02-16

    This document is the Affirmative Action Plan for January 1, 1994 through December 31, 1994 for the Lawrence Berkeley Laboratory, University of California (``LBL`` or ``the Laboratory.``) This is an official document that will be presented upon request to the Office of Federal Contract Compliance Programs, US Department of Labor. The plan is prepared in accordance with the Executive Order 11246 and 41 CFR Section 60-1 et seq. covering equal employment opportunity and will be updated during the year, if appropriate. Analyses included in this volume as required by government regulations are based on statistical comparisons. All statistical comparisons involve the use of geographic areas and various sources of statistics. The geographic areas and sources of statistics used here are in compliance with the government regulations, as interpreted. The use of any geographic area or statistic does not indicate agreement that the geographic area is the most appropriate or that the statistic is the most relevant. The use of such geographic areas and statistics is intended to have no significance outside the context of this Affirmative Action Plan, although, of course, such statistics and geographic areas will be used in good faith with respect to this Affirmative Action Plan.

  11. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  12. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  13. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  14. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  15. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  16. Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada Test Site, Nevada

    SciTech Connect

    Patrick Matthews

    2010-03-01

    Corrective Action Unit (CAU) 375 is located in Areas 25 and 30 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 375 comprises the two corrective action sites (CASs) listed below: • 25-23-22, Contaminated Soils Site • 30-45-01, U-30a, b, c, d, e Craters Existing information on the nature and extent of potential contamination present at the CAU 375 CASs is insufficient to evaluate and recommend corrective action alternatives (CAAs). This document details an investigation plan that will provide for the gathering of sufficient information to evaluate and recommend CAAs. Corrective Action Site 25-23-22 is composed of the releases associated with nuclear rocket testing at Test Cell A (TCA). Test Cell A was used to test and develop nuclear rocket motors as part of the Nuclear Rocket Development Station from its construction in 1958 until 1966, when rocket testing began being conducted at Test Cell C. The rocket motors were built with an unshielded nuclear reactor that produced as much as 1,100 kilowatts (at full power) to heat liquid hydrogen to 4,000 degrees Fahrenheit, at which time the expanded gases were focused out a nozzle to produce thrust. The fuel rods in the reactor were not clad and were designed to release fission fragments to the atmosphere, but due to vibrations and loss of cooling during some operational tests, fuel fragments in excess of planned releases became entrained in the exhaust and spread in the immediate surrounding area. Cleanup efforts have been undertaken at times to collect the fuel rod fragments and other contamination. Previous environmental investigations in the TCA area have resulted in the creation of a number of use restrictions. The industrial area of TCA is encompassed by a fence and is currently posted as a radioactive material area. Corrective Action Site 30-45-01 (releases associated with the Buggy Plowshare test) is located in Area 30 on Chukar Mesa. It was a

  17. Corrective Action Decision Document for Corrective Action Unit 322: Areas 1 and 3 Release Sites and Injection Wells Nevada Test Site, Nevada, Rev. No. 0

    SciTech Connect

    Robert Boehlecke

    2004-12-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 322, Areas 1 and 3 Release Sites and Injection Wells, Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 322 is comprised of the following corrective action sites (CASs): (1) 01-25-01 - AST Release Site; (2) 03-25-03 - Mud Plant and AST Diesel Release; and (3) 03-20-05 - Injection Wells and BOP Shop. The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative for each CAS within CAU 322. Corrective action investigation activities were performed from April 2004 through September 2004, as set forth in the Corrective Action Investigation Plan. The purposes of the activities as defined during the data quality objectives process were: (1) Determine if contaminants of concern (COCs) are present; (2) If COCs are present, determine their nature and extent; and (3) Provide sufficient information and data to recommend appropriate corrective actions for the CASs. Analytes detected during the corrective action investigation were evaluated against appropriate preliminary action levels to identify contaminants of concern for each corrective action site. Radiological field measurements were compared to unrestricted release criteria. Assessment of the data generated from investigation activities revealed the following: (1) CAS 01-25-01 contains an AST berm contaminated with total petroleum hydrocarbons (TPH) diesel-range organics (DRO). (2) CAS 03-25-03 includes two distinct areas: Area A where no contamination remains from a potential spill associated with an AST, and Area B where TPH-DRO contamination associated with various activities at the mud plant was identified. The Area B contamination was found at various locations and depths. (3) CAS 03-25-03 Area B contains TPH-DRO contamination at various locations and

  18. Buried Waste Integrated Demonstration commercialization actions plans. Volume 1

    SciTech Connect

    Kaupanger, R.M.; Glore, D.

    1994-04-01

    The Buried Waste Integrated Demonstration (BWID) is sponsored by US Department of Energy (DOE) Office of Technology Development. BWID supports the development and demonstration of a suite of technologies that when integrated with commercially available baseline technologies form a comprehensive system for the effective and efficient remediation of buried waste throughout the DOE complex. BWID evaluates, validates, and demonstrates technologies and transfers this information throughout DOE and private industry to support DOE. remediation planning and implementation activities. This report documents commercialization action plans for five technologies with near-term commercialization/ implementation potential as well as provides a status of commercial and academic partners for each technology.

  19. Commonwealth of the Northern Mariana Islands Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  20. On the importance of being first: serial order effects in the interaction between action plans and ongoing actions.

    PubMed

    Fournier, Lisa R; Gallimore, Jonathan M; Feiszli, Kevin R; Logan, Gordon D

    2014-02-01

    When we plan sequences of actions, we must hold some elements of the sequence in working memory (WM) while we execute others. Research shows that execution of an action can be delayed if it partly overlaps (vs. does not overlap) with another action plan maintained in WM (partial repetition cost). However, it is not known whether all features of the action maintained in WM interfere equally with current actions. Most serial models of memory and action assume that interference will be equal, because all action features in the sequence should be activated to an equal degree in parallel; others assume that action features earlier in the sequence will interfere more than those later in the sequence, because earlier features will be more active. Using a partial repetition paradigm, this study examined whether serial position of action features in action sequences maintained in WM have an influence on current actions. Two stimulus events occurred in a sequence, and participants planned and maintained an action sequence to the first event (action A) in WM while executing a speeded response to the second event (action B). Results showed delayed execution of action B when it matched the first feature in the action A sequence (partial repetition cost), but not when it matched the last feature. These findings suggest that serial order is represented in the action plan prior to response execution, consistent with models that assume that serial order is represented by a primacy gradient of parallel feature activation prior to action execution.

  1. Closure Report for Corrective Action Unit 300: Surface Release Areas Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 300 is located in Areas 23, 25, and 26 of the Nevada Test Site, which is located approximately 65 miles northwest of Las Vegas, Nevada. CAU 300 is listed in the Federal Facility Agreement and Consent Order of 1996 as Surface Release Areas and is comprised of the following seven Corrective Action Sites (CASs), which are associated with the identified Building (Bldg): {sm_bullet} CAS 23-21-03, Bldg 750 Surface Discharge {sm_bullet} CAS 23-25-02, Bldg 750 Outfall {sm_bullet} CAS 23-25-03, Bldg 751 Outfall {sm_bullet} CAS 25-60-01, Bldg 3113A Outfall {sm_bullet} CAS 25-60-02, Bldg 3901 Outfall {sm_bullet} CAS 25-62-01, Bldg 3124 Contaminated Soil {sm_bullet} CAS 26-60-01, Bldg 2105 Outfall and Decon Pad The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 23-21-03, 23-25-02, and 23-25-03 is no further action. As a best management practice, approximately 48 feet of metal piping was removed from CAS 23-25-02 and disposed of as sanitary waste. The NDEP-approved corrective action alternative for CASs 25-60-01, 25-60-02, 25-62-01, and 26-60-01, is clean closure. Closure activities for these CASs included removing and disposing of soil impacted with total petroleum hydrocarbons-diesel range organics (TPH-DRO), polychlorinated biphenyls (PCBs), semivolatile organic compounds (SVOCs), and cesium (Cs)-137, concrete impacted with TPH-DRO, and associated piping impacted with TPH-DRO. CAU 300 was closed in accordance with the NDEP-approved CAU 300 Corrective Action Plan (CAP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006). The closure activities specified in the CAP were based on the recommendations presented in the CAU 300 Corrective Action Decision Document (NNSA/NSO, 2005). This Closure Report documents CAU 300 closure activities. During closure activities, approximately 40 cubic yards (yd3) of low-level waste consisting of TPH-DRO-, PCB

  2. Corrective Action Investigation Plan for Corrective Action Unit 565: Stored Samples, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    Wickline, Alfred; McCall, Robert

    2006-08-01

    Corrective Action Unit (CAU) 565 is located in Area 26 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 565 is comprised of one corrective action site (CAS) listed--CAS 26-99-04, Ground Zero Soil Samples. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend closure of CAU 565. Additional information will be obtained by conducting a corrective action investigation before evaluating closure objectives and selecting the appropriate corrective action. The results of the field investigation will support closure and waste management decisions that will be presented in the Corrective Action Decision Document/Closure Report. The site will be investigated based on the data quality objectives (DQOs) developed on June 1, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was utilized to identify and define the type, amount, and quality of data needed to develop and evaluate closure for CAU 565. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to this CAS. The scope of the corrective action investigation for CAU 565 includes the following activities: (1) Remove stored samples, shelves, and debris from the interior of Building 26-2106. (2) Perform field screening on stored samples, shelves, and debris. (3) Dispose of stored samples, shelves, and debris. (4) Collect samples of investigation-derived waste, as needed, for waste management purposes. (5) Conduct radiological surveys of Building 26-2106 in accordance with the requirements in the ''NV/YMP Radiological Control Manual'' to determine if there is residual radiological contamination that would prevent the release of the building for unrestricted use. This

  3. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    USGS Publications Warehouse

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  4. EPA Actions in Response to Release of Radioactive Material from the Waste Isolation Pilot Plant (WIPP)

    EPA Pesticide Factsheets

    This document provides information about the actions EPA is taking to support and provide oversight of the WIPP release of radioactive material response effort, and provide information for the public.

  5. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Patrick Matthews

    2012-10-01

    CAU 104 comprises the following corrective action sites (CASs): • 07-23-03, Atmospheric Test Site T-7C • 07-23-04, Atmospheric Test Site T7-1 • 07-23-05, Atmospheric Test Site • 07-23-06, Atmospheric Test Site T7-5a • 07-23-07, Atmospheric Test Site - Dog (T-S) • 07-23-08, Atmospheric Test Site - Baker (T-S) • 07-23-09, Atmospheric Test Site - Charlie (T-S) • 07-23-10, Atmospheric Test Site - Dixie • 07-23-11, Atmospheric Test Site - Dixie • 07-23-12, Atmospheric Test Site - Charlie (Bus) • 07-23-13, Atmospheric Test Site - Baker (Buster) • 07-23-14, Atmospheric Test Site - Ruth • 07-23-15, Atmospheric Test Site T7-4 • 07-23-16, Atmospheric Test Site B7-b • 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.

  6. Implement balanced scorecard to translate strategic plan into actionable objectives.

    PubMed

    2004-09-01

    Faced with challenges ranging from declining reimbursement to staff shortages, health care organizations--integrated delivery systems, physician group practices, disease management providers, and others--increasingly are turning to general business models to map out step-by-step action plans for performance measurement and process improvement. Creating a "balanced scorecard" is an obvious starting point for assessing and improving clinical and financial performance.

  7. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  8. Functional exercise of Kingsley Dam emergency action plan

    SciTech Connect

    Boyd, K.M.

    1995-12-31

    At the request of the Federal Energy Regulatory Commission (F.E.R.C.), the Central Nebraska Public Power and Irrigation District (Central) performed a Functional Test of the Kingsley Dam Emergency Action Plan (E.A.P.) on October 27, 1992. The purpose of the exercise was to evaluate the Emergency Action Plan under a stress-induced environment with time constraints that exercised skills which are required for emergency management. This exercise was unique as it took place simultaneously at three different sites: North Platte Holiday Inn, Lincoln County Civil Defense Headquarters and the Keith County Civil Defense Office. Fifty miles separated the two Civil Defense Headquarters. There was a mobile command post that allowed radio communications between the different Civil Defenses offices. During the exercise, both levels of the E.A.P. (hazardous situation developing and failure has occurred) were tested. Both Keith and Lincoln County Civil Defense offices were able to test their own preparedness plans and communications. Besides the successful tests of the plans, a cooperative spirit was strengthened among the agencies as well as an exchange of knowledge and resources.

  9. Site action plan for maintenance management program. Revision D

    SciTech Connect

    Pearson, A.W.

    1993-11-30

    (DOE) Order 4330.4B, ``Maintenance Management Program`` requires each site to develop a Site Action Plan for implementing a Maintenance Management Program. Nonnuclear facilities are required to address the 32 elements of Chapter 1: Guidelines for the Conduct of Maintenance at DOE Nonnuclear Facilities. This document details the degree of implementation for each element, and the Martin Marietta Specialty Components, Inc., plan for implementation of the items which remain to be completed. The original Pinellas Plant Maintenance Management Program Site Action Plan (Issue A) was completed March 27, 1991. The format was modified per DOE request and it was resubmitted as Issue B and approved by AL September 16, 1991. Issue C was submitted, and approved December 20, 1992. The most significant achievement during FY-93 were the implementation of plant wide Graded Approach, and Configuration Control programs. The methodologies for performing these activities were developed, and pilot programs were implemented to verify their effectiveness. Plant wide implementation of both programs is progressing on a high priority basis. The formalized method for grading equipment and facilities provides a basis for establishing uniform, risk based priorities. The risks involved are environment, safety, health and programmatic mission. Other achievements for FY-93, include the establishment of procedures for the decommissioning, and down-grading of facilities, improved work control, improved work performance reporting, improved quality plans, and improved operating procedures.

  10. Information architecture: Standards adoption and retirement process service action plan

    SciTech Connect

    1997-03-01

    The purpose of this Service Action Plan is to announce, as well as provide, a high-level outline of a new Departmental process for the adoption and retirement of information technology standards. This process supports the implementation of a Department of Energy (DOE) Information Architecture. This plan was prepared with the Department of Energy information technology standards customers and stakeholders in mind. The process described in this plan will be serviced primarily by staff from the Office of the Deputy Assistant Secretary for Information Management with assistance from designated program and site Information Technology Standards Points of Contact. We welcome any comments regarding this new Departmental process and encourage the proposal of information technology standards for adoption or retirement.

  11. Record of Technical Change - Corrective Action Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office; Bechtel Nevada

    2005-04-13

    Record of Technical Change, Technical Change No. CAP-1, dated April 13, 2005 for Corrective Action Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Revision 0, September 2004, DOE/NV--1003.

  12. Action Plan for updated Chapter 15 Accident Analysis in the SRS Production Reactor SAR

    SciTech Connect

    Hightower, N.T. III; Burnett, T.W.

    1989-11-15

    This report describes the Action Plan for the upgrade of the Chapter 15 Accident Analysis in the SRS Production Reactor SAR required for K-Restart. This Action Plan will be updated periodically to reflect task accomplishments and issue resolutions.

  13. Workshop on the preparation of climate change action plans. Workshop summary

    SciTech Connect

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  14. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    SciTech Connect

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the Corrective Action Unit No. 426, which includes the Cactus Spring Waste Trenches, located at the Tonopah Test Range. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action. The scope of this investigation will include drilling and collecting subsurface samples from within and below the trenches. Sampling locations will be biased toward the areas most likely to be contaminated. The Cactus Spring Waste Trenches Site is identified as one of three potential locations for buried, radioactively contaminated materials from the Double Tracks Test. This test was the first of four storage-transportation tests conducted in 1963 as part of Operation Roller Coaster. The experiment involved the use of live animals to assess the inhalation intake of a plutonium aerosol.

  15. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation

  16. Planning perception and action for cognitive mobile manipulators

    NASA Astrophysics Data System (ADS)

    Gaschler, Andre; Nogina, Svetlana; Petrick, Ronald P. A.; Knoll, Alois

    2013-12-01

    We present a general approach to perception and manipulation planning for cognitive mobile manipulators. Rather than hard-coding single purpose robot applications, a robot should be able to reason about its basic skills in order to solve complex problems autonomously. Humans intuitively solve tasks in real-world scenarios by breaking down abstract problems into smaller sub-tasks and use heuristics based on their previous experience. We apply a similar idea for planning perception and manipulation to cognitive mobile robots. Our approach is based on contingent planning and run-time sensing, integrated in our knowledge of volumes" planning framework, called KVP. Using the general-purpose PKS planner, we model information-gathering actions at plan time that have multiple possible outcomes at run time. As a result, perception and sensing arise as necessary preconditions for manipulation, rather than being hard-coded as tasks themselves. We demonstrate the e ectiveness of our approach on two scenarios covering visual and force sensing on a real mobile manipulator.

  17. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  18. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    SciTech Connect

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  19. Modulatory action of taurine on the release of GABA in cerebellar slices of the guinea pig.

    PubMed

    Namima, M; Okamoto, K; Sakai, Y

    1983-01-01

    For the purpose of demonstrating the action of taurine as a neuromodulator in addition to its suggested neurotransmitter function, the effects of taurine and muscimol on the depolarization-induced Ca-dependent release of [3H] gamma-aminobutyric acid ([3H]GABA) and L-[3H]glutamate in cerebellar slices from guinea pigs were investigated. The release of [3H]GABA was found to be greatly decreased by a GABA agonist, muscimol, and by taurine, but not by glycine. The release of L-[3H]glutamate was little affected by taurine. The release of [3H]GABA, was enhanced by bicuculline and strychnine, but not by picrotoxin, and the suppressive action of muscimol on the GABA release was antagonized by bicuculline, picrotoxin, and strychnine, suggesting the possible existence of presynaptic autoreceptors for GABA in the cerebellum. The suppressive action of taurine on the release of [3H]GABA, on the other hand, was blocked only by bicuculline. These results suggest that taurine reduced the release of [3H]GABA from cerebellar slices by acting on the GABA autoreceptors or, more likely, on other types of receptors that are sensitive to bicuculline. As a possible mechanism for this modulatory action of taurine, the blockade by this amino acid of the influx of Ca2+ into cerebellar tissues was tentatively suggested.

  20. Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children

    ERIC Educational Resources Information Center

    Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert

    2013-01-01

    The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…

  1. Evaluating the Impact of Action Plans on Trainee Compliance with Learning Objectives

    ERIC Educational Resources Information Center

    Aumann, Michael J.

    2013-01-01

    This mixed methods research study evaluated the use of technology-based action plans as a way to help improve compliance with the learning objectives of an online training event. It explored how the action planning strategy impacted subjects in a treatment group and compared them to subjects in a control group who did not get the action plan. The…

  2. Report of the Tape Recorder Action Plan Committee, 21 March 1972

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A NASA/AF Tape Recorder Action Plan Committee was formed in January 1972 to investigate tape recorder problems and to recommend an action plan to NASA management. The committee collected data on tape recorder failure history, pinpointed problem areas, discussed needed technical and management changes, and proposed an action plan for the recommended approaches.

  3. Corrective Action Investigation Plan for Corrective Action Unit 487: Thunderwell Site, Tonopah Test Range, Nevada (Rev. No.: 0, January 2001)

    SciTech Connect

    DOE /NV

    2001-01-02

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 487, Thunderwell Site, Tonopah Test Range (TTR), Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 487 consists of a single Corrective Action Site (CAS), RG 26-001-RGRV, Thunderwell Site. The site is located in the northwest portion of the TTR, Nevada, approximately five miles northwest of the Area 3 Control Point and closest to the Cactus Flats broad basin. Historically, Sandia National Laboratories in New Mexico used CAU 487 in the early to mid-1960s for a series of high explosive tests detonated at the bottom of large cylindrical steel tubes. Historical photographs indicate that debris from these tests and subsequent operations may have been scattered and buried throughout the site. A March 2000 walk-over survey and a July 2000 geophysical survey indicated evidence of buried and surface debris in dirt mounds and areas throughout the site; however, a radiological drive-over survey also performed in July 2000 indicated that no radiological hazards were identified at this site. Based on site history, the scope of this plan is to resolve the problem statement identified during the Data Quality Objectives process that detonation activities at this CAU site may have resulted in the release of contaminants of concern into the surface/subsurface soil including total volatile and total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, radionuclides, total petroleum hydrocarbons, and high explosives. Therefore, the scope of corrective action field investigation will involve excavation, drilling, and extensive soil sampling and analysis activities to determine the extent (if any) of both the lateral and vertical contamination and whether

  4. Practice in Planning and Planning in Practice: Re-Assessing and Clarifying Action Research in a Multi-National Context

    ERIC Educational Resources Information Center

    Kusch, Jim; Rebolledo, Geisha; Ryan, Charly

    2005-01-01

    This paper responds to a call seeking presenters for an action-research event for elementary-school science teachers in Venezuela. The authors planned on the assumption that the participants would wish to leave with plans for introducing action-research approaches into their practice. In previous writing on action research, the various protocols…

  5. [Applicability of Children's Environment and Health Action Plan in Serbia].

    PubMed

    Ilić, Miroslava Kristoforović

    2010-01-01

    The Children's Environment and Health Action Plan for Europe was adopted at the 4th Ministry Conference on Environment (the World Health Organization, 2004). It is focused on children health care against hazards originating from the human environment. In its conclusion, the need is expressed for the development of national plans in the field of Environmental and Children Health for European region by 2007. Mutual activities would be obligatory for each country and their realization should be the responsibility of Ministers of Health Care and Environmental Health. In our country, a draft version of this document was recently adopted, where the following priority regional goals are proposed: safe drinking water and adequate sanitation, injury prevention and adequate physical activity, clean indoor and outdoor air, the human environment without chemicals. Every segment has been explained in details through activities, expected results, indicators, sources of verification and the main participants in the project implementation. The end of the action plan period is proposed to be the year 2019. It is also followed by a defined set of indicators: exposure, activities and health status. The analyses of particular activities or data to be used have pointed to some drawbacks of this draft version, which can be overcome by respecting expert opinions.

  6. Corrective Action Plan for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada

    SciTech Connect

    Bechtel Nevada

    1998-09-30

    This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that the landfill cells were used for solid waste disposal, including disposal of UXO.

  7. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within...

  8. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within...

  9. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within...

  10. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within...

  11. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within...

  12. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    ERIC Educational Resources Information Center

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  13. 75 FR 60759 - Enforcement Action Plan for Promotion and Advertising Restrictions; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... HUMAN SERVICES Food and Drug Administration Enforcement Action Plan for Promotion and Advertising... Plan for Promotion and Advertising Restrictions'' (Enforcement Action Plan), which describes FDA's plan to enforce the restrictions on promotion and advertising of menthol and other cigarettes to youth...

  14. The Representation of Action Plans in Long Term Memory

    NASA Technical Reports Server (NTRS)

    Fussfeld, G. N.; Koenig, W.; Karis, D.

    1984-01-01

    A sequence of experiments conducted on a two hand chord typewriter, to compare the efficiency of different coding principles employed to associate letters with their chord productions is described. This keyboard represents an effort to identify effective alternatives to the existing typewriter. It consists of two seperate 5-key panels (one for each hand), and letters are entered by typing chords composed of one to five fingers. Each panel is capable of producing the full alphabet. One group of experiments was designed to separate between perceptual and motor factors in the acivation of single letter chords. The results underline the importance of perceptual factors in the activation of motor plans. The complexity of the patterns employed to represent letters was shown to account for 50 percent of variance in the typing speeds of single letters. The theoretical implications of these results are discussed in relation to a vision based theory of action plans.

  15. Action plan for responses to abnormal conditions in Hanford Site radioactive waste tanks with high organic content. Revision 1

    SciTech Connect

    Fowler, K.D.

    1993-07-01

    This action plan describes the criteria and the organizational responsibilities required for ensuring that waste storage tanks with high organic contents are maintained in a safe condition at the Hanford Site. In addition, response actions are outlined for (1) prevention or mitigation of excessive temperatures; or (2) a material release from any waste tank with high organic content. Other response actions may be defined by Westinghouse Hanford Company Systems Engineering if a waste tank parameter goes out of specification. Trend analysis indicates the waste tank parameters have seasonal variations, but are otherwise stable.

  16. [Strategic planning: an important economic action for German hospitals].

    PubMed

    Wiese, Christoph H R; Zink, Wolfgang; Russo, Sebastian G

    2011-11-01

    In medical systems, economic issues and means of action are in the course of dwindling human (physicians and nurses) and financial resources are more important. For this reason, physicians must understand basic economic principles. Only in this way, there may be medical autonomy from social systems and hospital administrators. The current work is an approach to present a model for strategic planning of an anesthesia department. For this, a "strengths", "weaknesses", "opportunities", and "threats" (SWOT) analysis is used. This display is an example of an exemplary anaesthetic department.

  17. The scaup conservation action plan: working toward coherence

    USGS Publications Warehouse

    Austin, Jane E.

    2010-01-01

    The last in a series of three workshops to develop a decision framework for the scaup conservation action plan was conducted in September 2009. Fifteen waterfowl biologists and managers met in Memphis, Tennessee at the Ducks Unlimited Headquarters to review and refine the decision statement, objectives, and prototype model for the continental scaup population, with a special focus on vital rate parameters that are affected during migration and winter. In a significant step toward coherence, the participants also developed models for incorporating human dimensions – hunters – into the decision framework, and to link the population of diving duck hunters with the continental scaup population.

  18. 40 CFR 300.440 - Procedures for planning and implementing off-site response actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... applies to any remedial or removal action involving the off-site transfer of any hazardous substance... emergency removal actions under CERCLA, emergency actions taken during remedial actions, or response actions... administrative or judicial challenge to the finding of noncompliance or uncontrolled releases upon which...

  19. Impact of action planning on spatial perception: attention matters.

    PubMed

    Kirsch, Wladimir

    2015-03-01

    Previous research suggested that perception of spatial location is biased towards spatial goals of planned hand movements. In the present study I show that an analogous perceptual distortion can be observed if attention is paid to a spatial location in the absence of planning a hand movement. Participants judged the position of a target during preparation of a mouse movement, the end point of which could deviate from the target by a varying degree in Exp. 1. Judgments of target position were systematically affected by movement characteristics consistent with perceptual assimilation between the target and the planned movement goal. This effect was neither due to an impact of motor execution on judgments (Exp. 2) nor due to characteristics of the movement cues or of certain target positions (Exp. 3, Exp. 5A). When the task included deployment of attention to spatial positions (former movement goals) in preparation for a secondary perceptual task, an effect emerged that was comparable with the bias associated with movement planning (Exp. 4, Exp. 5B). These results indicate that visual distortions accompanying manipulations of variables related to action could be mediated by attentional mechanisms.

  20. Closure Report for Corrective Action Unit 322: Areas 1 and 3 Release Sites and Injection Wells, Nevada Test Site, Nevada

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    2006-06-01

    The purpose of this closure report is to document that the closure of CAU 322 complied with the Nevada Department of Environmental Protection-approved Corrective Action Plan closure requirements. The closure activities specified in the Corrective Action Plan were based on the approved corrective action alternatives presented in the CAU 322 Corrective Action Decision Document.

  1. Corrective Action Investigation Plan for Corrective Action Unit 486: Double Tracks RADSAFE Area Nellis Air Force Range, Nevada

    SciTech Connect

    IT Las Vegas

    1998-10-15

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 486, the Double Tracks Radiological Safety (RADSAFE) Area (DTRSA) which is located on the Nellis Air Force Range 71North (N), west of the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range Complex, is approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 486 is comprised of CAS 71-23-001-71DT consisting of two areas of concern referred to as the vehicle decontamination area and the animal burial pit. The DTRSA is located on the west side of the Cactus Range approximately 8 km (5 mi) southwest of the Cactus Spring gate at the intersection of the Cactus Spring Road and the Double Tracks Control Point Road (Figure 1-2). The DTRSA was used during May 1963 to decontaminate vehicles, equipment, personnel, and animals from the Double Tracks test. The DTRSA is one of three areas identified as a potential location for the disposal of radioactively contaminated

  2. Calcium releasing action of quercetin on sarcoplasmic reticulum from frog skeletal muscle.

    PubMed

    Kurebayashi, N; Ogawa, Y

    1984-10-01

    The release of Ca by quercetin from the sarcoplasmic reticulum has been claimed to be a result of the well-known inhibition of Ca2+-ATPase activity, or to be due to an intrinsic property of quercetin. To get a clearer understanding of the effect of quercetin, we examined it using fragmented sarcoplasmic reticulum (FSR) from bullfrog skeletal muscle. The rapid phase of Ca release (hereafter simply referred to as "Ca release") from loaded FSR was almost completed within 5 s after addition of quercetin in the presence of ATP. It cannot be ascribed to the inhibition of Ca2+-ATPase activity on the basis of following findings. First, when Ca uptake was driven by carbamylphosphate, no or little Ca release was observed in marked contrast to a stronger reduction in the rate of Ca uptake. Secondly, procaine reverses the Ca releasing action of quercetin, whereas it show a synergistic action in the inhibition of Ca2+-ATPase activity. Thirdly, HFSR released more Ca than LFSR, while the Ca2+-ATPase activities of both fractions were inhibited to a similar extent. The Ca release by quercetin is enhanced by ATP or beta, gamma-methylene adenosine triphosphate, and decreased by procaine or a high concentration of Mg2+. In the presence of 2.5 mM caffeine, the amount of Ca2+ released by quercetin was decreased, and the dose-effect relationship was shifted to higher doses of quercetin. This indicates that quercetin and caffeine probably overlap in the site(s) of the action, but that quercetin is dissimilar from halothane in the mode of its Ca-releasing action.

  3. Can persuasive messages encourage individuals to create action plans for physical activity?

    PubMed

    Sweet, Shane N; Brawley, Lawrence R; Hatchell, Alexandra; Gainforth, Heather L; Latimer-Cheung, Amy E

    2014-08-01

    Given the positive influence of action planning on physical activity, persuasive messages could be designed to promote action planning. The purpose of this paper was to test action planning messages in two studies. Participants were allocated to one of two message groups, reading either a physical activity only or physical activity plus action planning message (Study 1) and either a gain-framed or loss-framed action planning message (Study 2). The percent of individuals who created an action plan and the quality of the plans were evaluated. In Study 1, individuals in the physical activity plus action planning group created as many action plans as the physical activity only group, but their plans were higher quality. In Study 2, Week 2 differences between the gain- and loss-framed message groups were found for action planning. To our knowledge, these studies were the first to investigate message-induced action planning as a behavior. More research is needed to optimize these messages.

  4. Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska

    SciTech Connect

    DOE /NV

    2001-03-12

    This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e

  5. Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    SciTech Connect

    T. M. Fitzmaurice

    2000-05-01

    This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

  6. An action plan for tobacco control at regional level.

    PubMed

    Edwards, R; Brown, J S; Hodgson, P; Kyle, D; Reed, D; Wallace, B

    1999-07-01

    Smoking is the single biggest preventable cause of death in the UK; killing over 120 000 people each year, contributing to inequalities in health, exacerbating and causing poverty. Smoking has increased steadily among children since 1988 and more recently, among young adults. The current context in the UK is highly favourable for introducing comprehensive tobacco control measures. This paper summarises a regional action plan for tobacco control. Actions at district and regional levels are outlined to establish a comprehensive local tobacco control framework and complement national tobacco control measures. Measures include: a 'SWOT' analysis of current activity; systematic monitoring of smoking prevalence, attitudes to smoking, and the impact of tobacco control interventions; provision of effective smoking cessation support to a minimum standard throughout the health service; increased coverage of smoke-free public places and workplaces; enforcement of legislation on illegal sales to children and against smuggling and selling illegally imported tobacco; paid and unpaid mass media campaigns; and systematic lobbying for fiscal and legislative measures. One of the key components of the plan is the introduction of evidence-based tobacco control strategies at district levels. These should include a performance framework with clear organisational and managerial accountability and employ a co-ordinated, multiagency, partnership approach. Priority groups should be identified. Strategies should seek to engage the public to build support for tobacco control measures. Sufficient time, staff, resources and training must be allocated to tobacco control work and progress towards objectives monitored.

  7. Action, perception and postural planning when reaching for tools.

    PubMed

    Sunderland, Alan

    2013-06-01

    The dorsal and ventral streams model of action and perception suggests that reaching to grasp a tool for use involves integrated operation of the two streams. Few attempts have been made to test the limits of this integration in normal subjects. Twenty normal subjects reached for tools or geometric objects which were rotated rapidly during reaching or immediately beforehand. In a first experiment it was shown that reaching for an inverted tool was slower than reaching for objects which required hand inversion due to proximity to a physical barrier. Also, for the right hand, tool rotation during reaching provoked a higher incidence of hand rotation in the wrong direction than did rotation of objects. In a second similar experiment, hand inversion when grasping objects was induced by the need to plan a future action rather than by proximity of a physical barrier. Despite this balancing of complexity of postural planning for tools and objects, hand rotation errors for both hands were more common for tools than objects. This was consistent with the two-stream model in suggesting that there was a process which produced rapid online tracking of stimulus rotation and this had to be overcome by a slower process which dictated grasping in accordance with knowledge of tool use.

  8. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  9. Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Matthews, Patrick

    2014-01-01

    CAU 568 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 568, which comprises the following corrective action sites (CASs): • 03-23-17, S-3I Contamination Area • 03-23-19, T-3U Contamination Area • 03-23-20, Otero Contamination Area • 03-23-22, Platypus Contamination Area • 03-23-23, San Juan Contamination Area • 03-23-26, Shrew/Wolverine Contamination Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report.

  10. Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Grant Evenson

    2012-05-01

    Corrective Action Unit (CAU) 550 is located in Areas 7, 8, and 10 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 550, Smoky Contamination Area, comprises 19 corrective action sites (CASs). Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plumes, it was determined that some of the CAS releases are co-located and will be investigated as study groups. This document describes the planned investigation of the following CASs (by study group): (1) Study Group 1, Atmospheric Test - CAS 08-23-04, Atmospheric Test Site T-2C; (2) Study Group 2, Safety Experiments - CAS 08-23-03, Atmospheric Test Site T-8B - CAS 08-23-06, Atmospheric Test Site T-8A - CAS 08-23-07, Atmospheric Test Site T-8C; (3) Study Group 3, Washes - Potential stormwater migration of contaminants from CASs; (4) Study Group 4, Debris - CAS 08-01-01, Storage Tank - CAS 08-22-05, Drum - CAS 08-22-07, Drum - CAS 08-22-08, Drums (3) - CAS 08-22-09, Drum - CAS 08-24-03, Battery - CAS 08-24-04, Battery - CAS 08-24-07, Batteries (3) - CAS 08-24-08, Batteries (3) - CAS 08-26-01, Lead Bricks (200) - CAS 10-22-17, Buckets (3) - CAS 10-22-18, Gas Block/Drum - CAS 10-22-19, Drum; Stains - CAS 10-22-20, Drum - CAS 10-24-10, Battery. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed

  11. Mars Observer Propulsion and Pyrotechnics Corrective Actions Test Program Blanket Release

    NASA Technical Reports Server (NTRS)

    Saulsberry, Regor L.; Fries, Joseph (Technical Monitor)

    1999-01-01

    The Mars Observer Propulsion and Pyrotechnic Corrective Actions Test Program has been in progress at the NASA White Sands Test Facility since 1995. This program has developed capabilities to accurately characterize pyrovalve hazards and has established corrective actions that arc helping to preclude loss of spacecraft due to pyrovalve and propellant interaction. Rather than wait for conclusion of the test program, significant rest results, findings, and safety recommendations have been and will continue to be released soon after they became available to meet needs of near-term NASA and commercial space programs. This release will cover approximately three to five papers per year until program end.

  12. Closure Report for Corrective Action Unit 481: Area 12 T-Tunnel Conditional Release Storage Yard, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2008-11-01

    Corrective Action Unit (CAU) 481 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Area 12 T-Tunnel Conditional Release Storage Yard. CAU 481 is located in Area 12 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. This CAU consists of one Corrective Action Site (CAS), CAS 12-42-05, Housekeeping Waste. CAU 481 closure activities were conducted by the Defense Threat Reduction Agency from August 2007 through July 2008 according to the FFACO and Revision 3 of the Sectored Clean-up Work Plan for Housekeeping Category Waste Sites. Closure activities included removal and disposal of construction debris and low-level waste. Drained fluids, steel, and lead was recycled as appropriate. Waste generated during closure activities was appropriately managed and disposed.

  13. Corrective Action Investigation Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David Strand

    2006-06-01

    Corrective Action Unit 166 is located in Areas 2, 3, 5, and 18 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit (CAU) 166 is comprised of the seven Corrective Action Sites (CASs) listed below: (1) 02-42-01, Cond. Release Storage Yd - North; (2) 02-42-02, Cond. Release Storage Yd - South; (3) 02-99-10, D-38 Storage Area; (4) 03-42-01, Conditional Release Storage Yard; (5) 05-19-02, Contaminated Soil and Drum; (6) 18-01-01, Aboveground Storage Tank; and (7) 18-99-03, Wax Piles/Oil Stain. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on February 28, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 166. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the CAI for CAU 166 includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling. (2) Conduct radiological surveys. (3) Perform field screening. (4) Collect and submit environmental samples for laboratory analysis to determine if

  14. Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site

    SciTech Connect

    DOE /NV

    1998-11-01

    This Corrective Action Investigation Plan (CAIP) describes the US Department of Energy's (DOE's) continued environmental investigation of the subsurface Project Shoal Area (PSA) Corrective Action Unit (CAU) 447. The PSA is located in the Sand Springs Mountains in Churchill County, Nevada, about 48 kilometers (km) (30 miles [mi]) southeast of Fallon, Nevada. Project Shoal was part of the Vela Uniform Program which was conducted to improve the US' ability to detect, identify, and locate underground nuclear detonations. The test consisted of detonating a 12-kiloton nuclear device deep underground in granitic rock to determine whether seismic waves produced by an underground nuclear test could be differentiated from seismic waves produced by a naturally occurring earthquake. The test was a joint effort conducted by the US Atomic Energy Commission (AEC) and the US Department of Defense (DoD) in October 1963 (AEC, 1964).

  15. Corrective Action Decision Document/Closure Report for Corrective Action Unit 554: Area 23 Release Site Nevada Test Site, Nevada, Rev. No.: 0 with Errata Sheet

    SciTech Connect

    Evenson, Grant

    2005-12-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 554, Area 23 Release Site, located in Mercury at the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit (CAU) 554 is comprised of one corrective action site (CAS): CAS 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 554 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from January 18 through May 5, 2005, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site (NNSA/NSO, 2004) and Records of Technical Change No. 1 and No. 2. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern are present. (2) If contaminants of concern are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 554 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against preliminary action levels (PALs) established in the CAU 554 CAIP for total petroleum hydrocarbons (TPH) benzo(a)pyrene, dibenz(a,h)anthracene, and trichloroethene (TCE). Specifically: (1) The soil beneath and laterally outward from former underground storage tanks at CAS 23-02-08 contains TPH-diesel-range organics (DRO) above the PAL of 100 milligrams per kilogram, confined vertically from a depth of approximately 400 feet (ft) below ground surface (bgs). The

  16. North Slope (Wahluke Slope) expedited response action cleanup plan

    SciTech Connect

    Not Available

    1994-02-01

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

  17. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    SciTech Connect

    DOE /NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  18. A School Action Plan with Stakeholder Involvement: A Case Study of One Elementary School

    ERIC Educational Resources Information Center

    Getty, Jacob J., Jr.

    2011-01-01

    This case study focused on a school action plan, using a planning and implementation process that focused on improving stakeholder involvement and responsibility for student reading achievement at Eisenberg Elementary School. This study examined the impact of the school action process on the development of a new plan compared to other traditional…

  19. Cool Campus! A How-To Guide for College and University Climate Action Planning

    ERIC Educational Resources Information Center

    Simpson, Walter

    2009-01-01

    While a number of excellent campus climate planning resources are available, this guide attempts to fill a gap by providing an abundance of "how-to" information. The goal of the guide is to assist climate action planning teams at schools that are well versed in campus climate issues and well along in the CAP (Climate Action Planning) process as…

  20. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  1. Reflecting on Talk: A Mentor Teacher's Gradual Release in Co-Planning

    ERIC Educational Resources Information Center

    Pylman, Stacey

    2016-01-01

    The goal of this case study was to explore how a mentor teacher used video-recorded co-planning sessions to reflect on and improve one's mentoring practice. Findings reveal ways in which the mentor used talk in co-planning sessions to model one's thinking process and to gradually release planning responsibility to engage the intern in learning to…

  2. Smoking Cessation in Cardiac Patients: The Influence of Action Plans, Coping Plans and Self-Efficacy on Quitting Smoking

    ERIC Educational Resources Information Center

    de Hoog, Natascha; Bolman, Catherine; Berndt, Nadine; Kers, Esther; Mudde, Aart; de Vries, Hein; Lechner, Lilian

    2016-01-01

    Smoking cessation is the most effective action for cardiac patients who smoke to improve their prognosis, yet more than one-half of cardiac patients continue to smoke after hospital admission. This study examined the influence of action plans, coping plans and self-efficacy on intention to quit and smoking cessation in cardiac patients. Cardiac…

  3. Corrective Action Investigation Plan for the CNTA Subsurface Sites (CAU Number 443), Revision 1

    SciTech Connect

    USDOE /NV

    1999-02-01

    This Corrective Action Investigation Plan (CAIP) describes the U.S. Department of Energy's (DOE's) planned environmental investigation of the subsurface Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) No. 443. The CNTA is located in Hot Creek Valley in Nye County, Nevada, adjacent to U.S. Highway 6, about 48 kilometers (km) (30 miles [mi]) north of Warm Springs, Nevada. The CNTA was the site of Project Faultless, a nuclear device detonated in the subsurface by the U.S. Atomic Energy Commission (AEC) in January 1968. The purposes of this test were to gauge the seismic effects of a relatively large, high-yield detonation completed in Hot Creek Valley (outside the Nevada Test Site) and to determine the suitability of the site for future large detonations. The yield of the Faultless test was between 200 kilotons and 1 megaton. Two similar tests were planned for the CNTA, but neither of them was completed. Based on the general definition of a corrective action investigation (CAI) from Section IV.14 of the Federal Facility Agreement and Consent Order (FFACO), the purpose of the CAI is ''to gather data sufficient to characterize the nature, extent, and rate of migration or potential rate of migration from releases or discharges of pollutants or contaminants and/or potential releases or discharges from corrective action units identified at the facilities''. For CNTA CAU 443 the concepts developed for the Underground Test Area (UGTA) CAUs will be applied on a limited scale. For the UGTA CAUs, ''the objective of the CAI process is to define boundaries around each UGTA CAU that establish areas that contain water that may be unsafe for domestic and municipal use,'' as stated in Appendix VI of the FFACO (1996). Based on this strategy the CAI for CAU 443 will start with modeling using existing data. New data collection activities are generally contingent upon the results of the modeling and may or may not be part of the CAI. Specific objectives of the CAI ar e as

  4. 21 CFR 1316.93 - Ruling on petition for expedited release in an administrative forfeiture action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Ruling on petition for expedited release in an administrative forfeiture action. 1316.93 Section 1316.93 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION... commercial fishing industry vessel for which a summons has been issued shall dismiss the summons),...

  5. 26 CFR 301.7432-1 - Civil cause of action for failure to release a lien.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., analysis, engineering report, test, or project prepared for a court proceeding; and (D) Fees paid or... 26 Internal Revenue 18 2012-04-01 2012-04-01 false Civil cause of action for failure to release a... TREASURY (CONTINUED) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Judicial Proceedings...

  6. 26 CFR 301.7432-1 - Civil cause of action for failure to release a lien.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., analysis, engineering report, test, or project prepared for a court proceeding; and (D) Fees paid or... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Civil cause of action for failure to release a... TREASURY (CONTINUED) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Judicial Proceedings...

  7. 26 CFR 301.7432-1 - Civil cause of action for failure to release a lien.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., analysis, engineering report, test, or project prepared for a court proceeding; and (D) Fees paid or... 26 Internal Revenue 18 2011-04-01 2011-04-01 false Civil cause of action for failure to release a... TREASURY (CONTINUED) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Judicial Proceedings...

  8. 21 CFR 1316.92 - Petition for expedited release in an administrative forfeiture action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Petition for expedited release in an administrative forfeiture action. 1316.92 Section 1316.92 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION... authorized to effect administrative forfeiture as if the vessel had been physically seized. Upon...

  9. Applicability of action planning and coping planning to dental flossing among Norwegian adults: a confirmatory factor analysis approach.

    PubMed

    Astrøm, Anne Nordrehaug

    2008-06-01

    Using a prospective design and a representative sample of 25-yr-old Norwegians, this study hypothesized that action planning and coping planning will add to the prediction of flossing at 4 wk of follow-up over and above the effect of intention and previous flossing. This study tested the validity of a proposed 3-factor structure of the measurement model of intention, action planning, and coping planning and for its invariance across gender. A survey was conducted in three Norwegian counties, and 1,509 out of 8,000 randomly selected individuals completed questionnaires assessing the constructs of action planning and coping planning related to daily flossing. A random subsample of 500 participants was followed up at 4 wk with a telephone interview to assess flossing. Confirmatory factor analysis (CFA) confirmed the proposed 3-factor model after respecification. Although the chi-square test was statistically significant [chi(2) = 58.501, degrees of freedom (d.f.) = 17), complementary fit indices were satisfactory [goodness-of-fit index (GFI) = 0.99, root mean squared error of approximation (RMSEA) = 0.04]. Multigroup CFA provided evidence of complete invariance of the measurement model across gender. After controlling for previous flossing, intention (beta = 0.08) and action planning (beta = 0.11) emerged as independent predictors of subsequent flossing, accounting for 2.3% of its variance. Factorial validity of intention, action planning and coping planning, and the validity of action planning in predicting flossing prospectively, was confirmed by the present study.

  10. Smoking cessation in cardiac patients: the influence of action plans, coping plans and self-efficacy on quitting smoking.

    PubMed

    de Hoog, Natascha; Bolman, Catherine; Berndt, Nadine; Kers, Esther; Mudde, Aart; de Vries, Hein; Lechner, Lilian

    2016-06-01

    Smoking cessation is the most effective action for cardiac patients who smoke to improve their prognosis, yet more than one-half of cardiac patients continue to smoke after hospital admission. This study examined the influence of action plans, coping plans and self-efficacy on intention to quit and smoking cessation in cardiac patients. Cardiac patients completed a baseline questionnaire (N = 245) assessing demographic characteristics, smoking behavior, intention, self-efficacy, relapse self-efficacy and action and coping plans. Six months later (N = 184) continued abstinence from smoking was assessed. Self-efficacy predicted intention to quit smoking and was an indirect predictor of continued abstinence, through intention. Intention to quit smoking and making action plans both directly influenced continued abstinence. Future interventions to facilitate smoking cessation in cardiac patients should put strong emphasis on enhancing self-efficacy and on making specific action plans to increase the likelihood of smoking cessation.

  11. Anticipatory action planning in blind and sighted individuals

    PubMed Central

    Cavallo, Andrea; Ansuini, Caterina; Gori, Monica; Tinti, Carla; Tonelli, Alessia; Becchio, Cristina

    2017-01-01

    Several studies on visually guided reach-to-grasp movements have documented that how objects are grasped differs depending on the actions one intends to perform subsequently. However, no previous study has examined whether this differential grasping may also occur without visual input. In this study, we used motion capture technology to investigate the influence of visual feedback and prior visual experience on the modulation of kinematics by intention in sighted (in both full-vision and no-vision conditions), early-blind and late-blind participants. Results provide evidence of modulation of kinematics by intention to a similar degree under both full-vision and no-vision conditions. Moreover, they demonstrate that prior visual experience has little impact on the tailoring of grasping movements to intention. This suggests that sequential action planning does not depend on visual input, and may instead be ascribed to the function of multisensory-motor cortical network that operates and develops not only in light, but also in darkness. PMID:28304373

  12. Water Planning and Climate Change: Actionable Intelligence Yet?

    NASA Astrophysics Data System (ADS)

    Milly, P.

    2008-05-01

    alternative. What is to be done? Is climate-change information of sufficient strength to justify making decisions that differ from those that would be optimal under stationarity? I.e., does climate science provide "actionable intelligence" to water planners? A conservative approach to planning in the presence of climate change would begin with stationarity as a base and then superpose, with quantitative estimates of uncertainties, those model-projected changes that appear to be qualitatively robust. The current state of science suggests that the following changes could be considered robust: (1) reduction in the fraction of precipitation falling as snow and earlier seasonal melting of snow, with consequent seasonal redistribution of runoff and streamflow; (2) gradual sea-level rise with heightened risk of encroachment of saline water into coastal surface- and ground-water-supply sources; and (3) global redistribution of precipitation and resultant runoff, with regional focal points ("hot spots") of desiccation and moistening. Even considering the attendant uncertainties, the available information about these changes can significantly affect the cost-benefit-risk tradeoffs of existing and prospective water projects and, therefore, can rationally inform decisions about future courses of action or inaction.

  13. Corrective Action Decision Document for Corrective Action Unit 322: Areas 1 and 3 Release Sites and Injection Wells Nevada Test Site, Nevada, Revision 0 with ROTC 1

    SciTech Connect

    Boehlecke, Robert

    2004-12-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 322, Areas 1 and 3 Release Sites and Injection Wells, Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 322 is comprised of the following corrective action sites (CASs): (1) 01-25-01 - AST Release Site; (2) 03-25-03 - Mud Plant and AST Diesel Release; and (3) 03-20-05 - Injection Wells and BOP Shop. The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative for each CAS within CAU 322. Corrective action investigation activities were performed from April 2004 through September 2004, as set forth in the Corrective Action Investigation Plan. The purposes of the activities as defined during the data quality objectives process were: (1) Determine if contaminants of concern (COCs) are present; (2) If COCs are present, determine their nature and extent; and (3) Provide sufficient information and data to recommend appropriate corrective actions for the CASs. Analytes detected during the corrective action investigation were evaluated against appropriate preliminary action levels to identify contaminants of concern for each corrective action site. Radiological field measurements were compared to unrestricted release criteria. Assessment of the data generated from investigation activities revealed the following: (1) CAS 01-25-01 contains an AST berm contaminated with total petroleum hydrocarbons (TPH) diesel-range organics (DRO). (2) CAS 03-25-03 includes two distinct areas: Area A where no contamination remains from a potential spill associated with an AST, and Area B where TPH-DRO contamination associated with various activities at the mud plant was identified. The Area B contamination was found at various locations and depths. (3) CAS 03-25-03 Area B contains TPH-DRO contamination at various locations and

  14. The sequential encoding of competing action goals involves dynamic restructuring of motor plans in working memory.

    PubMed

    Gallivan, Jason P; Bowman, Natasha A R; Chapman, Craig S; Wolpert, Daniel M; Flanagan, J Randall

    2016-06-01

    Recent neural and behavioral findings provide support for the influential idea that in situations in which multiple action options are presented simultaneously, we prepare action plans for each competing option before deciding between and executing one of those plans. However, in natural, everyday environments, our available action options frequently change from one moment to the next, and there is often uncertainty as to whether additional options will become available before having to select a particular course of action. Here, with the use of a target-directed reaching task, we show that in this situation, the brain specifies a competing action for each new, sequentially presented potential target and that recently formed action plans can be revisited and updated so as to conform with separate, more newly developed, plans. These findings indicate that the brain forms labile motor plans for sequentially arising target options that can be flexibly restructured to accommodate new motor plans.

  15. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    USDOE /NV

    1999-05-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document.

  16. National Action Plan: Priorities for Managing Freshwater Resources in a Changing Climate

    EPA Pesticide Factsheets

    The National Action Plan is based on the latest science on climate risks to freshwater resources. The Plan establishes a national goal to have government agencies and citizens collaboratively manage freshwater resources in response to a changing climate.

  17. Interference due to shared features between action plans is influenced by working memory span.

    PubMed

    Fournier, Lisa R; Behmer, Lawrence P; Stubblefield, Alexandra M

    2014-12-01

    In this study, we examined the interactions between the action plans that we hold in memory and the actions that we carry out, asking whether the interference due to shared features between action plans is due to selection demands imposed on working memory. Individuals with low and high working memory spans learned arbitrary motor actions in response to two different visual events (A and B), presented in a serial order. They planned a response to the first event (A) and while maintaining this action plan in memory they then executed a speeded response to the second event (B). Afterward, they executed the action plan for the first event (A) maintained in memory. Speeded responses to the second event (B) were delayed when it shared an action feature (feature overlap) with the first event (A), relative to when it did not (no feature overlap). The size of the feature-overlap delay was greater for low-span than for high-span participants. This indicates that interference due to overlapping action plans is greater when fewer working memory resources are available, suggesting that this interference is due to selection demands imposed on working memory. Thus, working memory plays an important role in managing current and upcoming action plans, at least for newly learned tasks. Also, managing multiple action plans is compromised in individuals who have low versus high working memory spans.

  18. Dendritically released transmitters cooperate via autocrine and retrograde actions to inhibit afferent excitation in rat brain

    PubMed Central

    Hirasawa, Michiru; Schwab, Yannick; Natah, Sirajedin; Hillard, Cecilia J; Mackie, Ken; Sharkey, Keith A; Pittman, Quentin J

    2004-01-01

    Oxytocin is released from supraoptic magnocellular neurones and is thought to act at presynaptic receptors to inhibit transmitter release. We now show that this effect is mediated by endocannabinoids, but that oxytocin nonetheless plays an important role in endocannabinoid signalling. WIN55,212-2, a cannabinoid receptor agonist, mimicked the action of oxytocin and occluded oxytocin-induced presynaptic inhibition. The cannabinoid action is at the presynaptic terminal as shown by alteration in paired pulse ratio, a reduction in miniature EPSC frequency and immunohistochemical localization of CB1 receptors on presynaptic terminals. AM251, a CB1 receptor antagonist, blocked both the WIN55,212-2 and the oxytocin-induced presynaptic inhibition of EPSCs. Depolarization of postsynaptic magnocellular neurones (which contain fatty acid amide hydrolase, a cannabinoid catabolic enzyme) caused a transient inhibition of EPSCs that could be blocked by both the AM251 and Manning compound, an oxytocin/vasopressin receptor antagonist. This indicates that somatodendritic peptide release and action on previously identified autoreceptors facilitates the release of endocannabinoids that act as mediators of presynaptic inhibition. PMID:15254151

  19. Dendritically released transmitters cooperate via autocrine and retrograde actions to inhibit afferent excitation in rat brain.

    PubMed

    Hirasawa, Michiru; Schwab, Yannick; Natah, Sirajedin; Hillard, Cecilia J; Mackie, Ken; Sharkey, Keith A; Pittman, Quentin J

    2004-09-01

    Oxytocin is released from supraoptic magnocellular neurones and is thought to act at presynaptic receptors to inhibit transmitter release. We now show that this effect is mediated by endocannabinoids, but that oxytocin nonetheless plays an important role in endocannabinoid signalling. WIN55,212-2, a cannabinoid receptor agonist, mimicked the action of oxytocin and occluded oxytocin-induced presynaptic inhibition. The cannabinoid action is at the presynaptic terminal as shown by alteration in paired pulse ratio, a reduction in miniature EPSC frequency and immunohistochemical localization of CB1 receptors on presynaptic terminals. AM251, a CB1 receptor antagonist, blocked both the WIN55,212-2 and the oxytocin-induced presynaptic inhibition of EPSCs. Depolarization of postsynaptic magnocellular neurones (which contain fatty acid amide hydrolase, a cannabinoid catabolic enzyme) caused a transient inhibition of EPSCs that could be blocked by both the AM251 and Manning compound, an oxytocin/vasopressin receptor antagonist. This indicates that somatodendritic peptide release and action on previously identified autoreceptors facilitates the release of endocannabinoids that act as mediators of presynaptic inhibition.

  20. Highlights of the Fourth Canadian Symposium on Hepatitis C: Moving towards a National Action Plan.

    PubMed

    Sagan, Selena M; Dupont, Benoit; Grebely, Jason; Krajden, Mel; MacParland, Sonya A; Raven, Jennifer F; Saeed, Sahar; Feld, Jordan J; Tyrrell, D Lorne; Wilson, Joyce A

    2016-01-01

    Hepatitis C virus (HCV) affects at least 268,000 Canadians and causes greater disease burden than any other infectious disease in the country. The Canadian Institutes of Health Research (CIHR) and the Public Health Agency of Canada (PHAC) have identified HCV-related liver disease as a priority. In 2015, the release of well-tolerated, short course treatments (~12 weeks) able to cure the majority of treated HCV patients revolutionized HCV therapy. However, treatment is extremely costly and puts a significant burden on the Canadian healthcare system. Thus, managing treatment costs and improving treatment engagement in those most in need will be a key challenge. Diagnosis and treatment uptake are currently poor in Canada due to financial, geographical, cultural, and social barriers. The United States, Australia, and Scotland all have National Action Plans to prevent, diagnose, and treat HCV in order to efficiently reduce the burden and costs associated with HCV-related liver disease. The theme of the 4th annual symposium held on Feb 27, 2015, "Strategies to Manage HCV Infection in Canada: Moving towards a National Action Plan," was aimed at identifying strategies to maximize the impact of highly effective therapies to reduce HCV disease burden and ultimately eliminate HCV in Canada.

  1. Highlights of the Fourth Canadian Symposium on Hepatitis C: Moving towards a National Action Plan

    PubMed Central

    Sagan, Selena M.; Dupont, Benoit; Grebely, Jason; Krajden, Mel; MacParland, Sonya A.; Raven, Jennifer F.; Saeed, Sahar; Feld, Jordan J.; Tyrrell, D. Lorne; Wilson, Joyce A.

    2016-01-01

    Hepatitis C virus (HCV) affects at least 268,000 Canadians and causes greater disease burden than any other infectious disease in the country. The Canadian Institutes of Health Research (CIHR) and the Public Health Agency of Canada (PHAC) have identified HCV-related liver disease as a priority. In 2015, the release of well-tolerated, short course treatments (~12 weeks) able to cure the majority of treated HCV patients revolutionized HCV therapy. However, treatment is extremely costly and puts a significant burden on the Canadian healthcare system. Thus, managing treatment costs and improving treatment engagement in those most in need will be a key challenge. Diagnosis and treatment uptake are currently poor in Canada due to financial, geographical, cultural, and social barriers. The United States, Australia, and Scotland all have National Action Plans to prevent, diagnose, and treat HCV in order to efficiently reduce the burden and costs associated with HCV-related liver disease. The theme of the 4th annual symposium held on Feb 27, 2015, “Strategies to Manage HCV Infection in Canada: Moving towards a National Action Plan,” was aimed at identifying strategies to maximize the impact of highly effective therapies to reduce HCV disease burden and ultimately eliminate HCV in Canada. PMID:27446849

  2. Corrective Action Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada

    SciTech Connect

    D. S. Tobiason

    2000-05-01

    The purpose of this Corrective Action Plan is to provide the strategy and methodology to close the Area 25 Vehicle Washdown. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was performed during March 1999 at each CAS. Soil samples were collected at each CAS using a direct-push method. Soil samples were collected from the surface to depths of up to 2.7 m (9 ft) below ground surface. In addition, the gravel sump at CAS 25-07-02 (F and J Roads Pad) was sampled using a backhoe. Soil samples were collected from depths of 0 to 0.6 m (0 to 2 ft) below the gravel layer in the sump.

  3. Fact Sheet: EPCRA Amendments to Emergency Planning and Notification; Emergency Release Notification and Hazardous Chemical Reporting

    EPA Pesticide Factsheets

    2008 minor revisions to the emergency planning and emergency release notification sections; as well as the revisions to hazardous chemical reporting regulations covering the Tier I and Tier II forms, and how to report hazardous chemicals in a mixture.

  4. Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada

    SciTech Connect

    K. B. Campbell

    2002-12-01

    This Closure Report (CR) documents the activities undertaken to close Corrective Action Unit (CAU) 326, Areas 6 and 27 Release Sites, in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996. Site closure was performed in accordance with the Nevada Division of Environmental Protection (NDEP)-approved Streamlined Approach for Environmental Restoration Plan (SAFER) Plan for CAU 326 (US Department of Energy, Nevada Operations Office [DOE/NV, 2001]). CAU 326 consists of four Corrective Action Sites (CASs), 06-25-01, 06-25-02, 06-25-04, and 27-25-01. CAS 06-25-01 is a release site associated with an underground pipeline that carried heating oil from the heating oil underground storage tank (UST), Tank 6-CP-1, located to the west of Building CP-70 to the boiler in Building CP-1 located in the Area 6 Control Point (CP) compound. This site was closed in place administratively by implementing use restrictions. CAS 06-25-02 is a hydrocarbon release associated with an active heating oil UST, Tank 6-DAF-5, located west of Building 500 at the Area 6 Device Assembly Facility. This site was closed in place administratively by implementing use restrictions. CAS 06-25-04 was a hydrocarbon release associated with Tank 6-619-4. This site was successfully remediated when Tank 6-619-4 was removed. No further action was taken at this site. CAS 27-25-01 is an excavation that was created in an attempt to remove hydrocarbon-impacted soil from the Site Maintenance Yard in Area 27. Approximately 53 cubic meters (m{sup 3}) (70 cubic yards [yd{sup 3}]) of soil impacted by total petroleum hydrocarbons (TPH) and polychlorinated biphenyls (PCBs) was excavated from the site in August of 1994. Clean closure of this site was completed in 2002 by the excavation and disposal of approximately 160 m{sup 3} (210 yd{sup 3}) of PCB-impacted soil.

  5. Corrective Action Investigation Plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfields, Nevada Test Site, Revision 0, DOE/NV--535 UPDATED WITH RECORD OF TECHNICAL CHANGE No.1

    SciTech Connect

    US DOE Nevada Operations Office

    1999-04-12

    The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

  6. Nantucket, Ma. Climate Protection Action Plan: A Public Outreach Strategy

    NASA Astrophysics Data System (ADS)

    Petrik, C.; Stephenson, A.; Petsch, S.

    2009-12-01

    As communities and municipalities gain a better understanding of climate change, they are exploring the ways in which to work towards adaptation and mitigation. One strategy that the Island of Nantucket, Massachusetts turned toward is the drafting of a Climate Protection Action Plan (CPAP). The CPAP was developed during the summer of 2009 to meet three goals: (1) assist the Town of Nantucket in creating a framework to help them reduce CO2 emissions; (2) educate the municipality and community in techniques that promote energy efficiency and sustainability on the island; and (3) document past, present and future approaches adopted by the Town towards emissions reduction and energy sustainability. In particular, this project focused on using local strengths and natural resources identified by island stakeholders that may help the island to mitigate carbon emissions and adapt to climate change.. Drafting the CPAP provided community members and politicians with an opportunity to become better educated in the science of climate change and to learn how climate change will affect their community. On the island of Nantucket, leaders in the religious, civic, and political communities were brought into a conversation about how each group could contribute to reducing greenhouse gas emissions. A geosciences graduate student was brought into the CPAP team as a climate fellow to facilitate this conversation. This provided the foundation for stakeholder recommendations incorporated into the CPAP. This capacity-building model served as an effective way to create an informal learning environment about climate change that allowed members of the island community to directly participate in developing their locally appropriate climate protection strategy. The draft CPAP developed through this study and presented to the Town of Nantucket comprises assessments and recommendations in public research and education; building and energy efficiency; transportation; renewable energy; and carbon

  7. World Stroke Organization global stroke services guidelines and action plan.

    PubMed

    Lindsay, Patrice; Furie, Karen L; Davis, Stephen M; Donnan, Geoffrey A; Norrving, Bo

    2014-10-01

    Every two seconds, someone across the globe suffers a symptomatic stroke. 'Silent' cerebrovascular disease insidiously contributes to worldwide disability by causing cognitive impairment in the elderly. The risk of cerebrovascular disease is disproportionately higher in low to middle income countries where there may be barriers to stroke care. The last two decades have seen a major transformation in the stroke field with the emergence of evidence-based approaches to stroke prevention, acute stroke management, and stroke recovery. The current challenge lies in implementing these interventions, particularly in regions with high incidences of stroke and limited healthcare resources. The Global Stroke Services Action Plan was conceived as a tool to identifying key elements in stroke care across a continuum of health models. At the minimal level of resource availability, stroke care delivery is based at a local clinic staffed predominantly by non-physicians. In this environment, laboratory tests and diagnostic studies are scarce, and much of the emphasis is placed on bedside clinical skills, teaching, and prevention. The essential services level offers access to a CT scan, physicians, and the potential for acute thrombolytic therapy, however stroke expertise may still be difficult to access. At the advanced stroke services level, multidisciplinary stroke expertise, multimodal imaging, and comprehensive therapies are available. A national plan for stroke care should incorporate local and regional strengths and build upon them. This clinical practice guideline is a synopsis of the core recommendations and quality indicators adapted from ten high quality multinational stroke guidelines. It can be used to establish the current level of stroke services, target goals for expanding stroke resources, and ensuring that all stages of stroke care are being adequately addressed, even at the advanced stroke services level. This document is a start, but there is more to be done

  8. Corrective Action Decision Document/Closure Report for Corrective Action Unit 554: Area 23 Release Site Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Evenson, Grant

    2005-07-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 554, Area 23 Release Site, located in Mercury at the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit (CAU) 554 is comprised of one corrective action site (CAS): (1) CAS 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 554 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from January 18 through May 5, 2005, as set forth in the ''Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site'' (NNSA/NSO, 2004) and Records of Technical Change No. 1 and No. 2. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern are present. (2) If contaminants of concern are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 554 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against preliminary action levels (PALs) established in the CAU 554 CAIP for total petroleum hydrocarbons (TPH) benzo(a)pyrene, dibenz(a,h)anthracene, and trichloroethene (TCE). Specifically: (1) The soil beneath and laterally outward from former underground storage tanks at CAS 23-02-08 contains TPH-diesel-range organics (DRO) above the PAL of 100 milligrams per kilogram, confined vertically from a depth of approximately 400 feet (ft) below ground surface (bgs). The

  9. Aquatic ecosystem condition: The Fraser River Action Plan approach

    SciTech Connect

    Tuominen, T.; Raymond, B.; Sekela, M.; Reynoldson, T.

    1995-12-31

    A major goal of the Canadian government`s Fraser River Action Plan (FRAP) is to clean up existing pollution problems in the Fraser River Basin. In support of this goal, the Environmental Quality Assessment Program is assessing the quality of the aquatic environment, particularly with respect to contaminants. The program, conducted from 1993 to 1998, is to establish a baseline condition for the aquatic ecosystem against which the success of clean up efforts can be measured. The FRAP approach is to use a combination of contaminant exposure or stressor indicators and organism ``effects`` indicators. The focus is on three components of the aquatic ecosystem: (1) bed sediment, (2) resident fish and (3) benthos. A priority for the program is integration of the three components, wherever possible. Bed sediments, as indicators of contaminant stress, are sampled at fourteen reaches in the river and major tributaries. Two species of resident fish are sampled and analyzed for condition factors, enzyme induction, histopathology and contaminant content at each of nine sites in the basin. The resident fish data are providing a measure of contaminant exposure and effect. Organism community effects will be assessed by a study which is classifying approximately 200 tributary and mainstem sites based on benthos community structure. For the first time in a large river system in Canada, this benthos study uses a multivariate approach which relates a suite of chemical and physical characteristics to benthos community structure.

  10. Process safety management and interim or remedial action plans

    SciTech Connect

    Boss, M.J.; Henney, D.A.; Heitzman, V.K.; Day, D.W.

    1996-12-31

    Remedial Actions, including Interim Remedial Activities, often require the use of treatment facilities or stabilization techniques using on-site chemical processes. As such, the 29 CFR 1910.119 Process Safety Management (PSM) of Highly Hazardous Chemicals (PSM Standard) and the USEPA regulations for Risk Management Planning require that these chemicals and their attendant potential hazards be identified. A Hazard and Operation (HAZOP) study, Failure Mode and Effect Analysis (FMEA), Fault Tree Analysis, or equivalent graphic presentation of processes must be completed. These studies form a segment of the Process Hazard Analysis (PHA). HAZOP addresses each system and each element of a system that could deviate from normal operations and thus cause a hazard. A full assessment of each process is produced by looking at the hazards, consequences, causes and personnel protection needed. Many variables must be considered when choosing the appropriate PHA technique including the size of the plant, the number of processes, the types of processes, and the types of chemicals used. A mixture of these techniques may be required to adequately transmit information about the process being evaluated.

  11. NFE--Planning and Organizing for Action. Courier No. 27.

    ERIC Educational Resources Information Center

    ASPBAE Courier Service, 1983

    1983-01-01

    This issue contains six articles, reports, and essays on planning and organizing nonformal education in the Asian-South Pacific area. A chapter reprinted from "Planning Nonformal Education" discusses the need for planning, past efforts, and five steps in a strategy suggested for planning locally-oriented and target-specific nonformal…

  12. Gathering Strength: Canada's Aboriginal Action Plan. A Progress Report = Rassembler nos forces: Le plan d'action du Canada pour les questions autochtones. Rapport d'etape.

    ERIC Educational Resources Information Center

    Department of Indian Affairs and Northern Development, Ottawa (Ontario).

    Gathering Strength is an integrated government-wide plan to address the key challenges facing Canada's Aboriginal people. Following an initial section on reconciliation of historic grievances, this report describes initiatives in the four areas addressed by the action plan: (1) partnerships (all schools received public awareness materials;…

  13. FMRP regulates neurotransmitter release and synaptic information transmission by modulating action potential duration via BK channels.

    PubMed

    Deng, Pan-Yue; Rotman, Ziv; Blundon, Jay A; Cho, Yongcheol; Cui, Jianmin; Cavalli, Valeria; Zakharenko, Stanislav S; Klyachko, Vitaly A

    2013-02-20

    Loss of FMRP causes fragile X syndrome (FXS), but the physiological functions of FMRP remain highly debatable. Here we show that FMRP regulates neurotransmitter release in CA3 pyramidal neurons by modulating action potential (AP) duration. Loss of FMRP leads to excessive AP broadening during repetitive activity, enhanced presynaptic calcium influx, and elevated neurotransmitter release. The AP broadening defects caused by FMRP loss have a cell-autonomous presynaptic origin and can be acutely rescued in postnatal neurons. These presynaptic actions of FMRP are translation independent and are mediated selectively by BK channels via interaction of FMRP with BK channel's regulatory β4 subunits. Information-theoretical analysis demonstrates that loss of these FMRP functions causes marked dysregulation of synaptic information transmission. FMRP-dependent AP broadening is not limited to the hippocampus, but also occurs in cortical pyramidal neurons. Our results thus suggest major translation-independent presynaptic functions of FMRP that may have important implications for understanding FXS neuropathology.

  14. The Role of Cue-Response Mapping in Motorvisual Impairment and Facilitation: Evidence for Different Roles of Action Planning and Action Control in Motorvisual Dual-Task Priming

    ERIC Educational Resources Information Center

    Thomaschke, Roland; Hopkins, Brian; Miall, R. Christopher

    2012-01-01

    Previous research has shown that actions impair the visual perception of categorically action-consistent stimuli. On the other hand, actions can also facilitate the perception of spatially action-consistent stimuli. We suggest that motorvisual impairment is due to action planning processes, while motorvisual facilitation is due to action control…

  15. Toward a Theoretical Framework for Understanding the Relationship between Situated Action and Planned Action Models of Behavior in Information Retrieval Contexts: Contributions from Phenomenology.

    ERIC Educational Resources Information Center

    Ng, Kwong Bor

    2002-01-01

    Discussion of human-computer interaction and planned action focuses on the belief that it is impossible to consider an action without an a priori plan, even according to the phenomenological position taken for granted by the situated action theory. Reports results of a quasi-experiment that focused on plan deviation within an information seeking…

  16. THE 2006 CMAQ RELEASE AND PLANS FOR 2007

    EPA Science Inventory

    The 2006 release of the Community Multiscale Air Quality (CMAQ) model (Version 4.6) includes upgrades to several model components as well as new modules for gas-phase chemistry and boundary layer mixing. Capabilities for simulation of hazardous air pollutants have been expanded ...

  17. Action potentials and amphetamine release antipsychotic drug from dopamine neuron synaptic VMAT vesicles

    PubMed Central

    Tucker, Kristal R.; Block, Ethan R.; Levitan, Edwin S.

    2015-01-01

    Based on lysotracker red imaging in cultured hippocampal neurons, antipsychotic drugs (APDs) were proposed to accumulate in synaptic vesicles by acidic trapping and to be released in response to action potentials. Because many APDs are dopamine (DA) D2 receptor (D2R) antagonists, such a mechanism would be particularly interesting if it operated in midbrain DA neurons. Here, the APD cyamemazine (CYAM) is visualized directly by two-photon microscopy in substantia nigra and striatum brain slices. CYAM accumulated slowly into puncta based on vacuolar H+-ATPase activity and dispersed rapidly upon dissipating organelle pH gradients. Thus, CYAM is subject to acidic trapping and released upon deprotonation. In the striatum, Ca2+-dependent reduction of the CYAM punctate signal was induced by depolarization or action potentials. Striatal CYAM overlapped with the dopamine transporter (DAT). Furthermore, parachloroamphetamine (pCA), acting via vesicular monoamine transporter (VMAT), and a charged VMAT, substrate 1-methyl-4-phenylpyridinium (MPP+), reduced striatal CYAM. In vivo CYAM administration and in vitro experiments confirmed that clinically relevant CYAM concentrations result in vesicular accumulation and pCA-dependent release. These results show that some CYAM is in DA neuron VMAT vesicles and suggests a new drug interaction in which amphetamine induces CYAM deprotonation and release as a consequence of the H+ countertransport by VMAT that accompanies vesicular uptake, but not by inducing exchange or acting as a weak base. Therefore, in the striatum, APDs are released with DA in response to action potentials and an amphetamine. This synaptic corelease is expected to enhance APD antagonism of D2Rs where and when dopaminergic transmission occurs. PMID:26216995

  18. Corrective Action Decision Document/ Closure Report for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada with Errata Sheet, Revision 0

    SciTech Connect

    Grant Evenson

    2008-09-01

    This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit 556, Dry Wells and Surface Release Points, located at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit (CAU) 556 is comprised of four corrective action sites (CASs): • 06-20-04, National Cementers Dry Well • 06-99-09, Birdwell Test Hole • 25-60-03, E-MAD Stormwater Discharge and Piping • 25-64-01, Vehicle Washdown and Drainage Pit The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 556 with no further corrective action. To achieve this, corrective action investigation (CAI) activities began on February 7 and were completed on June 19, 2008, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada (NNSA/NSO, 2007). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. The CAU 556 data were evaluated based on the data quality assessment process, which demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 556 that required the completion of a corrective action. Assessment of the data generated from investigation activities conducted at CAU 556 revealed the following: • Corrective Action Sites 06-20-04, 06-99-09, and 25-64-01 do not contain contamination at

  19. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-04-01

    6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005).

  20. A Strategic Action Plan for Advancing Math and Science Education in New Mexico 2007-2010

    ERIC Educational Resources Information Center

    New Mexico Public Education Department, 2007

    2007-01-01

    This Strategic Action Plan for Advancing Math and Science Education is an initial outline of strategies, actions, measures of progress, resources needed, timelines, and responsible parties. The Plan focuses on these three main goals: (1) increasing student interest, participation, and achievement in math and science; (2) raising public support and…

  1. 40 CFR 77.4 - Administrator's action on proposed offset plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Administrator's action on proposed offset plans. 77.4 Section 77.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) EXCESS EMISSIONS § 77.4 Administrator's action on proposed offset plans....

  2. Using Action Plans to Support Communication Programming for Children Who Are Deafblind

    ERIC Educational Resources Information Center

    Bruce, Susan M.

    2008-01-01

    The author describes the use of action plans to support 2 teachers' post-in-service implementation of communication strategies with 3 children who are deafblind. In the action plans, the teachers recorded changes in thinking and instructional practices under the 4 aspects of communication: form, function, content, and context. They also recorded…

  3. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    SciTech Connect

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  4. 24 CFR 248.233 - Approval of a plan of action that includes incentives.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING ACT AND OTHER AUTHORITIES PREPAYMENT OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income Preservation Act of 1987 § 248.233 Approval of a plan of action...— (1) The housing will be retained as housing affordable for very low income families,...

  5. 76 FR 80205 - Instituting a National Action Plan On Women, Peace, And Security

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... Order 13595 of December 19, 2011 Instituting a National Action Plan On Women, Peace, And Security By the... hereby ordered as follows: Section 1. Policy. (a) The United States recognizes that promoting women's... policy and practice of the executive branch of the United States to have a National Action Plan on...

  6. Action Planning in Typically and Atypically Developing Children (Unilateral Cerebral Palsy)

    ERIC Educational Resources Information Center

    Craje, Celine; Aarts, Pauline; Nijhuis-van der Sanden, Maria; Steenbergen, Bert

    2010-01-01

    In the present study, we investigated the development of action planning in children with unilateral Cerebral Palsy (CP, aged 3-6 years, n = 24) and an age matched control group. To investigate action planning, participants performed a sequential movement task. They had to grasp an object (a wooden play sword) and place the sword in a hole in a…

  7. Corrective Action Investigation Plan for Corrective Action Unit 576: Miscellaneous Radiological Sites and Debris Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Matthews, Patrick

    2016-12-01

    Corrective Action Unit (CAU) 576 is located in Areas 2, 3, 5, 8, and 9 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 576 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 576, which comprises the following corrective action sites (CASs): 00-99-01, Potential Source Material; 02-99-12, U-2af (Kennebec) Surface Rad-Chem Piping; 03-99-20, Area 3 Subsurface Rad-Chem Piping; 05-19-04, Frenchman Flat Rad Waste Dump ; 09-99-08, U-9x (Allegheny) Subsurface Rad-Chem Piping; 09-99-09, U-9its u24 (Avens-Alkermes) Surface Contaminated Flex Line These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document (CADD).

  8. Action potential evoked transmitter release in central synapses: insights from the developing calyx of Held

    PubMed Central

    2009-01-01

    Chemical synapses are the fundamental units that mediate communication between neurons in the mammalian brain. In contrast to the enormous progress made in mapping out postsynaptic contributions of receptors, scaffolding structures and receptor trafficking to synaptic transmission and plasticity, the small size of nerve terminals has largely precluded direct analyses of presynaptic modulation of excitability and transmitter release in central synapses. Recent studies performed in accessible synapses such as the calyx of Held, a giant axosomatic synapse in the sound localization circuit of the auditory brainstem, have provided tremendous insights into how central synapses regulate the dynamic gain range of synaptic transmission. This review will highlight experimental evidence that resolves several long-standing issues with respect to intricate interplays between the waveform of action potentials, Ca2+ currents and transmitter release and further conceptualize their relationships in a physiological context with theoretical models of the spatial organization of voltage-gated Ca2+ channels and synaptic vesicles at release sites. PMID:19939269

  9. Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada: Revision 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-09-26

    This Closure Report (CR) presents information supporting a closure recommendation for Corrective Action Unit (CAU) 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada, in compliance with the requirements of the Federal Facility Agreement and Consent Order. This CAU contains six Corrective Action Sites (CASs): 12-25-04, UST 12-16-2 Waste Oil Release; 18-25-01, 18-25-02, 18-25-03, Oil Spills; 18-25-04, Spill (Diesel Fuel); and 29-44-01, Fuel Spill, located within Areas 12, 18, and 29 on the Nevada Test Site. The purpose of this CR is to provide documentation supporting recommendations of no further action or closure in place for CASs within CAU 394. Throughout late 2002 and early to mid 2003, closure activities were performed as set forth in the CAU 394 Streamlined Approach for Environmental Restoration Plan. The closure activities identified the nature and extent of contaminants of potential concern at the CASs, and provided sufficient information and data to complete appropriate corrective actions for the CASs. Soil in CASs 18-25-02 and 18-25-03 containing polychlorinated biphenyls exceeding the action levels established by the Nevada Administrative Code were removed for proper disposal. The soil remaining in these CASs containing petroleum hydrocarbons exceeding the action level were closed in place with use restrictions. Corrective Action Sites 18-25-04 required no further corrective action; closure in place is required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03, and 29-44-01; and use restrictions are required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03 and 29-44-01. In summary, no corrective action plan is required for CAU 394.

  10. Building Energy Benchmarking in India: an Action Plan for Advancing the State-of-the-Art

    SciTech Connect

    Sarraf, Saket; Anand, Shilpi; Shukla, Yash; Mathew, Paul; Singh, Reshma

    2014-06-01

    This document describes an action plan for advancing the state of the art of commercial building energy benchmarking in the Indian context. The document is primarily intended for two audiences: (a) Research and development (R&D) sponsors and researchers can use the action plan to frame, plan, prioritize and scope new energy benchmarking R&D in order to ensure that their research is market relevant; (b) Policy makers and program implementers engaged in the deployment of benchmarking and building efficiency rating programmes can use the action plan for policy formulation and enforcement .

  11. 49 CFR 659.37 - Corrective action plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requiring corrective actions; and (2) Findings from safety and security reviews performed by the oversight..., DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight... that a proposed alternate action(s) has been implemented subject to oversight agency review...

  12. 42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action...

  13. 42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action...

  14. 42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action...

  15. 42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action...

  16. 42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action...

  17. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    SciTech Connect

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  18. Final consolidated action plan to Tiger Team. Volume 2, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  19. Final consolidated action plan to Tiger Team. Volume 1, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  20. Action Research to Support the Sustainability of Strategic Planning

    ERIC Educational Resources Information Center

    Antheil, Jane H.; Spinelli, Stephen, Jr.

    2011-01-01

    This article suggests that developing a strategic plan, even through a highly participative and data-driven process, is not sufficient to sustain change if implementation of the plan is not monitored as an organizational change event. To the degree that a strategic plan is institutionally transformative, monitoring change during implementation…

  1. M.A.P.S.: Mesa Action Planning System.

    ERIC Educational Resources Information Center

    Larson, Elizabeth J. Hunt

    This report describes implementation of a districtwide planning model in the Mesa, Arizona, Public Schools. Figures illustrate planning processes throughout the report. Intended as an implementive framework, the planning system's purposes are to assist decision making about resource allocation, program direction, progress measurement, and district…

  2. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    NASA Technical Reports Server (NTRS)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  3. Does action planning moderate the intention-habit interaction in the exercise domain? A three-way interaction analysis investigation.

    PubMed

    de Bruijn, Gert-Jan; Rhodes, Ryan E; van Osch, Liesbeth

    2012-10-01

    Both habit strength and action planning have been found to moderate the intention-exercise behaviour relationship, but no research exists that has investigated how habit strength and action planning simultaneously influence this relationship. The present study was designed to explore this issue in a prospective sample of undergraduate students (N = 415): action planning, habit strength, intention, attitudes, subjective norms and perceived behavioural control were assessed at baseline and exercise behaviour was assessed 2 weeks later. Both habit strength and action planning moderated the intention-exercise relationship, with stronger relationship at higher levels of planning or habit strength. Decomposing a significant action planning × habit strength × intention interaction showed that the strength of the intention-exercise relationship progressed linearly through levels of action planning and habit strength. These novel results show that action planning strengthens the intention-habit strength interaction in the exercise domain: exercise interventions should therefore focus on simultaneously bolstering action planning and habit strength.

  4. Corrective Action Investigation Plan for Corrective Action Unit 98: Frenchman Flat, Nevada Test Site, Nevada (Revision 1)

    SciTech Connect

    USDOE /NV

    1999-07-01

    This Corrective Action Investigation Plan (CAIP) has been developed for Frenchman Flat Corrective Action Unit (CAU) 98. The Frenchman Flat CAU is located along the eastern border of the Nevada Test Site (NTS) and includes portions of Areas 5 and 11. The Frenchman Flat CAU constitutes one of several areas of the Nevada Test Site used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in the vicinity as well as downgradient of the underground test areas. The CAIP describes the Corrective Action Investigation (CAI) to be conducted at the Frenchman Flat CAU to evaluate the extent of contamination in groundwater due to the underground nuclear testing. The Frenchman Flat CAI will be conducted by the Underground Test Area (UGTA) Project which is a part of the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Environmental Restoration Project. The CAIP is a requirement of the Federal Facility Agreement and Consent Order (FFACO) (1996 ) agreed to by the U.S. Department of Energy (DOE), the Nevada Division of Environmental Protection (NDEP), and the U.S. Department of Defense (DoD). Based on the general definition of a CAI from Section IV.14 of the FFACO, the purpose of the CAI is ''...to gather data sufficient to characterize the nature, extent, and rate of migration or potential rate of migration from releases or discharges of pollutants or contaminants and/or potential releases or discharges from corrective action units identified at the facilities...'' (FFACO, 1996). However, for the Underground Test Area (UGTA) CAUs, ''...the objective of the CAI process is to define boundaries around each UGTA CAU that establish areas that contain water that may be unsafe for domestic and municipal use.'', as stated in Appendix VI of the FFACO (1996). According to the UGTA strategy (Appendix VI of the FFACO), the CAI of a given CAU starts with the evaluation of the existing data. New data collection activities are generally

  5. I Plan Therefore I Choose: Free-Choice Bias Due to Prior Action-Probability but Not Action-Value.

    PubMed

    Suriya-Arunroj, Lalitta; Gail, Alexander

    2015-01-01

    According to an emerging view, decision-making, and motor planning are tightly entangled at the level of neural processing. Choice is influenced not only by the values associated with different options, but also biased by other factors. Here we test the hypothesis that preliminary action planning can induce choice biases gradually and independently of objective value when planning overlaps with one of the potential action alternatives. Subjects performed center-out reaches obeying either a clockwise or counterclockwise cue-response rule in two tasks. In the probabilistic task, a pre-cue indicated the probability of each of the two potential rules to become valid. When the subsequent rule-cue unambiguously indicated which of the pre-cued rules was actually valid (instructed trials), subjects responded faster to rules pre-cued with higher probability. When subjects were allowed to choose freely between two equally rewarded rules (choice trials) they chose the originally more likely rule more often and faster, despite the lack of an objective advantage in selecting this target. In the amount task, the pre-cue indicated the amount of potential reward associated with each rule. Subjects responded faster to rules pre-cued with higher reward amount in instructed trials of the amount task, equivalent to the more likely rule in the probabilistic task. Yet, in contrast, subjects showed hardly any choice bias and no increase in response speed in favor of the original high-reward target in the choice trials of the amount task. We conclude that free-choice behavior is robustly biased when predictability encourages the planning of one of the potential responses, while prior reward expectations without action planning do not induce such strong bias. Our results provide behavioral evidence for distinct contributions of expected value and action planning in decision-making and a tight interdependence of motor planning and action selection, supporting the idea that the underlying

  6. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 499: Hydrocarbon Spill Site, Tonopah Test Range, Nevada

    SciTech Connect

    T. M. Fitzmaurice

    2001-09-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 499, Hydrocarbon Spill Site, Tonopah Test Range (TTR). This CAU is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996). CAU 499 is located on the TTR and consists of the following single Corrective Action Site (CAS) (Figure 1): CAS RG-25-001-RD24 - Radar 24 Diesel Spill Site is a diesel fuel release site that is assumed to have been cased by numerous small historical over fillings, spills and leaks from an above-ground storage tank (AST) over a period of 36 years. The tank was located on the north side of Building 24-50 on the TTR approximately 4.0 kilometers (2.5 miles) southwest of the Area 3 Compound at the end of the Avenue 24.

  7. Beyond Static and Dynamic Risk Factors: The Incremental Validity of Release Planning for Predicting Sex Offender Recidivism

    ERIC Educational Resources Information Center

    Scoones, Carwyn D.; Willis, Gwenda M.; Grace, Randolph C.

    2012-01-01

    Both desistance research and strengths-based approaches to offender rehabilitation suggest that attempts to reduce sex offender recidivism should attend to an offender's release environment. Recent research has demonstrated that better quality release planning is associated with reduced recidivism; however, whether release planning contributes…

  8. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS... implementing agency should consider the following factors as appropriate: (1) The physical and...

  9. A soil plan of action to awaken society beyond 2015

    NASA Astrophysics Data System (ADS)

    Jones, Arwyn; Bampa, Francesca; Towers, Willie; Broll, Gabrielle; Vargas, Ronald

    2014-05-01

    suite of positive examples offered by soil enthusiasts is to provide a common platform appropriate to all parts of the world, with a common consensus on soil issues to be covered and be brought to the table of consumers. The Global Soil Partnership (GSP) is an interactive, responsive and voluntary partnership, open to governments, regional organizations, institutions and other stakeholders. One of the pillars of action aims to "Encourage investment, technical cooperation, policy, education awareness and extension in soil". In order to achieve this goal, a small regionally balanced committee was formed following the 3rd European Network on Soil Awareness conference in Aberdeen and the 2nd Global Soil Week in Berlin. This group produced a draft plan of action that will be submitted to the Intergovernmental technical Panel on Soils (ITPS) of the GSP. Some key points that we need to address are: finding new soil communicators to awake and engage the society and the political arena (e.g. actors, poets, artists, etc.); focusing on a harmonised public perception of soil and their importance for environment and society; re-introducing soil science into the school curricula as a cross-cutting discipline designing a coherent but flexible structure and ensuring a proper and logical constructive transition between each learning stage (e.g. training teachers, web-based courses/ web-based platform, etc.). REFERENCES Bouma J, Broll G, Crane TA, Dewitte O, Gardi C, Schulte RPO, Towers W (2012) Soil information in support of policy making and awareness raising. Current Opinion in Environmental Sustainability, 4, 552-558. EC (2006) (COM(2006)231 final) Communication from the Commission to the Council, the European Parliament, the European Economic and Social Committee of the Regions, Thematic Strategy for Soil Protection. (ed Commission E), Brussels, Belgium.

  10. Climatic Action Plan Project for the state of Veracruz (Mexico)

    NASA Astrophysics Data System (ADS)

    Tejeda, A.; Ochoa, C.

    2007-05-01

    With financing of the British Government and support of the National Institute of Ecology, from April of 2006 to March of 2008 an action plan which intends variability effects and climatic change for the state of Veracruz will be made. This plan will be taken to the state government and will be spread out to manufacturers, industrialists and population. Throughout the Gulf of Mexico, the state of Veracruz is a 745 km coast in length with a width that goes from 156 km in the center to 47 km in the north. The state has large mountains, forests, plains, rivers, cascades, lagoons and coasts. Veracruz is the 10th largest state in Mexico with a 72,420 km2 surface, it is located between 17°00' and 22°28' north latitude and between 93°95' and 98°38' west longitude. Because of the orographic effect, the Sierra Madre Oriental causes the existence of many types of climate, from dry to tropical forest, going through snow on the top of the Pico de Orizaba (5747m of altitude). The wind affects the coasts by not allowing to fish during a hundred days a year (particularly in winter), and on summer tropical waves and occasionally hurricanes affect rivers causing overflow and urban floods in fields. These phenomena do not have a regular affectation; they are subject to climate variability effects. Veracruz is the third state with most population in the country (7.1 million people in 2005), only surpassed by the state of Mexico and Mexico City. Although it occupies 3.7% of the national territory, Veracruz has 6.9% of human population in the country, and is the 6th state of PIB national contribution (240 thousands of millions pesos approximately). Of the possible effects of the climatic change the following can be expected: , , : Most of the coasts of the Gulf of Mexico, low and sandy, less of a meter on the sea level, represent the most vulnerable territory of Veracruz. Towns will be affected, the saline water will infiltrate until the phreatic mantles and the coast electrical

  11. Action potential bursts enhance transmitter release at a giant central synapse.

    PubMed

    Zhang, Bo; Sun, Liang; Yang, Yi-Mei; Huang, Hong-Ping; Zhu, Fei-Peng; Wang, Li; Zhang, Xiao-Yu; Guo, Shu; Zuo, Pan-Li; Zhang, Claire X; Ding, Jiu-Ping; Wang, Lu-Yang; Zhou, Zhuan

    2011-05-01

    Patterns of action potentials (APs), often in the form of bursts, are critical for coding and processing information in the brain. However, how AP bursts modulate secretion at synapses remains elusive. Here, using the calyx of Held synapse as a model we compared synaptic release evoked by AP patterns with a different number of bursts while the total number of APs and frequency were fixed. The ratio of total release produced by multiple bursts to that by a single burst was defined as 'burst-effect'.We found that four bursts of 25 stimuli at 100 Hz increased the totalcharge of EPSCs to 1.47 ± 0.04 times that by a single burst of 100 stimuli at the same frequency.Blocking AMPA receptor desensitization and saturation did not alter the burst-effect, indicating that it was mainly determined by presynaptic mechanisms. Simultaneous dual recordings of presynaptic membrane capacitance (Cm) and EPSCs revealed a similar burst-effect, being 1.58±0.13by Cm and 1.49±0.05 by EPSCs. Reducing presynapticCa2+ influx by lowering extracellular Ca2+concentration or buffering residual intracellular Ca2+ with EGTA inhibited the burst-effect. We further developed a computational model largely recapitulating the burst-effect and demonstrated that this effect is highly sensitive to dynamic change in availability of the releasable pool of synaptic vesicles during various patterns of activities. Taken together, we conclude that AP bursts modulate synaptic output mainly through intricate interaction between depletion and replenishment of the large releasable pool. This burst-effect differs from the somatic burst-effect previously described from adrenal chromaffin cells, which substantially depends on activity-induced accumulation of Ca2+ to facilitate release of a limited number of vesicles in the releasable pool. Hence, AP bursts may play an important role in dynamically regulating synaptic strength and fidelity during intense neuronal activity at central synapses.

  12. Defense Acquisition Workforce: Actions Needed to Guide Planning Efforts and Improve Workforce Capability

    DTIC Science & Technology

    2015-12-01

    DEFENSE ACQUISITION WORKFORCE Actions Needed to Guide Planning Efforts and Improve Workforce Capability Report... Planning Efforts and Improve Workforce Capability Why GAO Did This Study GAO and others have found that DOD needs to take steps to ensure DOD...develop an acquisition workforce plan every 2 years. DOD issued a plan in 2010, in which it called for the department to increase the size of the

  13. Alternatives/action plan report for outfall 17

    SciTech Connect

    1994-11-01

    This Document contains information pertaining to alternatives/action associated with controlling ammonia entering through outfall 17. This document identifies the location of contaminate source, the ammonia concentration levels entering East Fork Poplar Creek, and the action taken to reduce/eliminate the toxicity problem.

  14. A Career Development Plan for Community Action Agencies.

    ERIC Educational Resources Information Center

    Gartner, Alan; Jones, Nina

    A system for career advancement in the community action agency must be based on the fundamental principle that it is the responsibility of the community action agency to develop the full potential of the nonprofessional staff. The agency must take the initiative on several aspects of its policy and program. Nonprofessional employees must be able…

  15. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nevada, Revision 1

    SciTech Connect

    Irene Farnham and Sam Marutzky

    2011-07-01

    This CADD/CAP follows the Corrective Action Investigation (CAI) stage, which results in development of a set of contaminant boundary forecasts produced from groundwater flow and contaminant transport modeling of the Frenchman Flat CAU. The Frenchman Flat CAU is located in the southeastern portion of the NNSS and comprises 10 underground nuclear tests. The tests were conducted between 1965 and 1971 and resulted in the release of radionuclides in the subsurface in the vicinity of the test cavities. Two important aspects of the corrective action process are presented within this CADD/CAP. The CADD portion describes the results of the Frenchman Flat CAU data-collection and modeling activities completed during the CAI stage. The corrective action objectives and the actions recommended to meet the objectives are also described. The CAP portion describes the corrective action implementation plan. The CAP begins with the presentation of CAU regulatory boundary objectives and initial use restriction boundaries that are identified and negotiated by NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The first two stages of the strategy have been completed for the Frenchman Flat CAU. A value of information analysis and a CAIP were developed during the CAIP stage. During the CAI stage, a CAIP addendum was developed, and the activities proposed in the CAIP and addendum were completed. These activities included hydrogeologic investigation of the underground testing areas, aquifer testing, isotopic and geochemistry-based investigations, and integrated geophysical investigations. After these investigations, a groundwater flow and contaminant transport model was developed to forecast contaminant boundaries that enclose areas potentially exceeding the Safe Drinking

  16. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    SciTech Connect

    T. M. Fitzmaurice

    2000-08-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

  17. Safe School: A Planning Guide for Action. 1995 Edition.

    ERIC Educational Resources Information Center

    California State Office of the Attorney General, Sacramento. Crime Prevention Center.

    This guidebook shows how schools can form partnerships with law-enforcement agencies and communities to develop a comprehensive safe-school plan. The planning guide is based on four principles: that safe schools are caring schools, are built through cooperative efforts of all stakeholders, communicate high standards, and stress prevention. This…

  18. A Social-Action Approach for Planning Education.

    ERIC Educational Resources Information Center

    Bolan, Richard S.; And Others

    The growing complexity of urban industrial society necessitates adequate planning techniques to insure future livability, but traditional methods of training planners have emphasized technology and ignored the human element. To remedy this deficiency, training programs should be expanded to include the social and political aspects of planning.…

  19. Vision 21: An Action Plan for the 21st Century.

    ERIC Educational Resources Information Center

    Cleveland Public Schools, OH.

    VISION 21 uses community and staff input and the most current thought on reform in education to create the schools Cleveland wants. The full implementation of its plans will result in a quality education for all the city's children. This document provides the framework within which VISION 21 was developed, the planning process used in its…

  20. Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-04-06

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  1. Corticotropin-releasing hormone mediates alpha-melanocyte-stimulating hormone-induced anorexigenic action in goldfish.

    PubMed

    Matsuda, Kouhei; Kojima, Kenji; Shimakura, Sei-Ichi; Wada, Kohei; Maruyama, Keisuke; Uchiyama, Minoru; Kikuyama, Sakae; Shioda, Seiji

    2008-11-01

    alpha-Melanocyte-stimulating hormone (alpha-MSH) and corticotropin-releasing hormone (CRH) both suppress food intake, and the alpha-MSH- or CRH-signaling pathway has possible potency to mediate anorexigenic actions induced by most other neuropeptides in goldfish. Therefore, using specific receptor antagonists, we examined whether the anorexigenic actions of alpha-MSH and CRH mutually interact. The inhibitory effect of ICV injection of the alpha-MSH agonist, melanotan II (MT II), on food intake was abolished by treatment with a CRH 1/2 receptor antagonist, alpha-helical CRH((9-41)), whereas the anorexigenic action of ICV-injected CRH was not affected by treatment with a melanocortin 4 receptor antagonist, HS024. This led us to investigate whether alpha-MSH-containing neurons in the goldfish brain have direct inputs to CRH-containing neurons, using confocal laser scanning microscopy. alpha-MSH- and CRH-like immunoreactivities were distributed throughout the brain, especially in the diencephalon. alpha-MSH-containing nerve fibers or endings lay in close apposition to CRH-containing neurons in a region of the hypothalamus, the nucleus posterioris periventricularis (NPPv). These results indicate that, in goldfish, alpha-MSH-induced anorexigenic action is mediated by the CRH-signaling pathway, and that CRH plays a crucial role in the regulation of feeding behavior as an integrated anorexigenic neuropeptide in this species.

  2. Multi-action planning for threat management: a novel approach for the spatial prioritization of conservation actions.

    PubMed

    Cattarino, Lorenzo; Hermoso, Virgilio; Carwardine, Josie; Kennard, Mark J; Linke, Simon

    2015-01-01

    Planning for the remediation of multiple threats is crucial to ensure the long term persistence of biodiversity. Limited conservation budgets require prioritizing which management actions to implement and where. Systematic conservation planning traditionally assumes that all the threats in priority sites are abated (fixed prioritization approach). However, abating only the threats affecting the species of conservation concerns may be more cost-effective. This requires prioritizing individual actions independently within the same site (independent prioritization approach), which has received limited attention so far. We developed an action prioritization algorithm that prioritizes multiple alternative actions within the same site. We used simulated annealing to find the combination of actions that remediate threats to species at the minimum cost. Our algorithm also accounts for the importance of selecting actions in sites connected through the river network (i.e., connectivity). We applied our algorithm to prioritize actions to address threats to freshwater fish species in the Mitchell River catchment, northern Australia. We compared how the efficiency of the independent and fixed prioritization approach varied as the importance of connectivity increased. Our independent prioritization approach delivered more efficient solutions than the fixed prioritization approach, particularly when the importance of achieving connectivity was high. By spatially prioritizing the specific actions necessary to remediate the threats affecting the target species, our approach can aid cost-effective habitat restoration and land-use planning. It is also particularly suited to solving resource allocation problems, where consideration of spatial design is important, such as prioritizing conservation efforts for highly mobile species, species facing climate change-driven range shifts, or minimizing the risk of threats spreading across different realms.

  3. Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Patrick Matthews

    2012-09-01

    Corrective Action Unit (CAU) 105 is located in Area 2 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 105 is a geographical grouping of sites where there has been a suspected release of contamination associated with atmospheric nuclear testing. This document describes the planned investigation of CAU 105, which comprises the following corrective action sites (CASs): • 02-23-04, Atmospheric Test Site - Whitney • 02-23-05, Atmospheric Test Site T-2A • 02-23-06, Atmospheric Test Site T-2B • 02-23-08, Atmospheric Test Site T-2 • 02-23-09, Atmospheric Test Site - Turk These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 105. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with all CAU 105 CASs are from atmospheric nuclear testing activities. The presence and nature of contamination at CAU

  4. Communicating Nursing Care Using the Health Level Seven Consolidated Clinical Document Architecture Release 2 Care Plan.

    PubMed

    Matney, Susan A; Dolin, Gay; Buhl, Lindy; Sheide, Amy

    2016-03-01

    A care plan provides a patient, family, or community picture and outlines the care to be provided. The Health Level Seven Consolidated Clinical Document Architecture (C-CDA) Release 2 Care Plan Document is used to structure care plan data when sharing the care plan between systems and/or settings. The American Nurses Association has recommended the use of two terminologies, Logical Observation Identifiers Names and Codes (LOINC) for assessments and outcomes and Systematized Nomenclature of Medicine-Clinical Terms (SNOMED CT) for problems, procedures (interventions), outcomes, and observation findings within the C-CDA. This article describes C-CDA, introduces LOINC and SNOMED CT, discusses how the C-CDA Care Plan aligns with the nursing process, and illustrates how nursing care data can be structured and encoded within a C-CDA Care Plan.

  5. How You Move Is What I See: Planning an Action Biases a Partner's Visual Search.

    PubMed

    Dötsch, Dominik; Vesper, Cordula; Schubö, Anna

    2017-01-01

    Activating action representations can modulate perceptual processing of action-relevant dimensions, indicative of a common-coding of perception and action. When two or more agents work together in joint action, individual agents often need to consider not only their own actions and their effects on the world, but also predict the actions of a co-acting partner. If in these situations the action of a partner is represented in a functionally equivalent way to the agent's own actions, one may also expect interaction effects between action and perception across jointly acting individuals. The present study investigated whether the action of a co-acting partner may modulate an agent's perception. The "performer" prepared a grasping or pointing movement toward a physical target while the "searcher" performed a visual search task. The performer's planned action impaired the searcher's perceptual performance when the search target dimension was relevant to the performer's movement execution. These results demonstrate an action-induced modulation of perceptual processes across participants and indicate that agents represent their partner's action by employing the same perceptual system they use to represent an own action. We suggest that task representations in joint action operate along multiple levels of a cross-brain predictive coding system, which provides agents with information about a partner's actions when they coordinate to reach a common goal.

  6. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada Test Site, Nevada

    SciTech Connect

    Mark Krauss

    2010-06-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 114 comprises the following corrective action site (CAS) located in Area 25 of the Nevada Test Site: • 25-41-03, EMAD Facility This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 25-41-03. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for CAS 25-41-03. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval. The CAS will be investigated based on the data quality objectives (DQOs) developed on April 30, 2009, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 25-41-03. The following text summarizes the SAFER

  7. Remedial Action Plan for Deer Lake Area of Concern, 1987

    EPA Pesticide Factsheets

    Stage I document details Deer Lake’s history of mercury and other contamination, and describes sources of pollution and future remedial actions, to address beneficial use impairments identified by the Great Lakes Water Quality Board (WQB).

  8. Planning, preparation, execution, and imagery of volitional action.

    PubMed

    Deecke, L

    1996-03-01

    There are different motor sets, which a human subject can be in or act from: he or she can be in a self-initiated voluntary movement set (action) or in a response set (re-action). Also, imagery sets are available that are necessary for the acquisition and practice of skill. Most important are such imagery sets for rehearsal in theatre, dance, music, sports, combat, etc.

  9. Plans for Release of Simulated Interplanetary Materials Into Low Earth Orbit

    NASA Astrophysics Data System (ADS)

    Strong, I. B.; Brownlee, R. R.; Farnum, E. H.; Huebner, W. F.; Kunkle, T. D.; Stephens, J. R.; Bode, M. F.

    A number of experimental releases into low earth orbit of small, but detectable, quantities of very fine particulates are planned for the next several years. The principal materials are chemically and physically similar to those generally assumed to be the major constituents of interplanetary and circumstellar dusts (silicates, silicon carbide, graphitic materials). Later releases will include multi-phase releases of non-volatile particulates and volatile ices, simulating cometary material. Both ground-based and Space-Shuttle-based observations will be made in the visible and infra-red to study particle-plasma interactions, cometary physics and cloud dynamics in orbit.

  10. IDENTIFYING HIGH PRIORITY EXPOSURE RESEARCH SUPPORTING THE EPA ASBESTOS ACTION PLAN

    EPA Science Inventory

    The EPA Asbestos Action Plan outlines areas, including two exposure assessment areas, where research is needed to reduce uncertainties in current asbestos risk assessments. Scientists from the National Exposure Research Laboratory (NERL) recently conducted survey and literature ...

  11. Case-Based Plan Recognition Using Action Sequence Graphs

    DTIC Science & Technology

    2014-10-01

    Kumaran, 2007), and probabilistic approaches (e.g., Bui, 2003; Charniak & Goldman, 1991, 1993; Geib & Goldman, 2009; Goldman, Geib & Miller, 1999...Sixteenth UK Workshop on Case-Based Reasoning. Cambridge, UK: Springer. Geib , C. W., & Goldman, R. P. (2009). A probabilistic plan recognition...and practice. San Mateo, CA: Morgan Kaufmann. Goldman, R.P., Geib , C.W., & Miller, C.A. (1999). A new model of plan recognition. Proceedings of the

  12. FMRP Regulates Neurotransmitter Release and Synaptic Information Transmission by Modulating Action Potential Duration via BK channels

    PubMed Central

    Deng, Pan-Yue; Rotman, Ziv; Blundon, Jay A.; Cho, Yongcheol; Cui, Jianmin; Cavalli, Valeria; Zakharenko, Stanislav S.; Klyachko, Vitaly A.

    2013-01-01

    SUMMARY Loss of FMRP causes Fragile X syndrome (FXS), but the physiological functions of FMRP remain highly debatable. Here we show that FMRP regulates neurotransmitter release in CA3 pyramidal neurons by modulating action potential (AP) duration. Loss of FMRP leads to excessive AP broadening during repetitive activity, enhanced presynaptic calcium influx and elevated neurotransmitter release. The AP broadening defects caused by FMRP loss have a cell-autonomous presynaptic origin and can be acutely rescued in postnatal neurons. These presynaptic actions of FMRP are translation-independent and are mediated selectively by BK channels via interaction of FMRP with BK channel’s regulatory β4 subunits. Information-theoretical analysis demonstrates that loss of these FMRP functions causes marked dysregulation of synaptic information transmission. FMRP-dependent AP broadening is not limited to the hippocampus, but also occurs in cortical pyramidal neurons. Our results thus suggest major translation-independent presynaptic functions of FMRP that may have important implications for understanding FXS neuropathology. PMID:23439122

  13. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    SciTech Connect

    Pava, Daniel S.

    2015-03-25

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) and integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.

  14. Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-05-08

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Station (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  15. Corrective Action Investigation Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada with ROTC 1

    SciTech Connect

    Matthews, Patrick

    2014-09-01

    Corrective Action Unit (CAU) 541 is co-located on the boundary of Area 5 of the Nevada National Security Site and Range 65C of the Nevada Test and Training Range, approximately 65 miles northwest of Las Vegas, Nevada. CAU 541 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 541, which comprises the following corrective action sites (CASs): 05-23-04, Atmospheric Tests (6) - BFa Site; 05-45-03, Atmospheric Test Site - Small Boy. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on April 1, 2014, by representatives of the Nevada Division of Environmental Protection; U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 541. The site investigation process also will be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CASs 05-23-04 and 05-45-03 are from nuclear testing activities conducted at the Atmospheric Tests (6) - BFa Site and Atmospheric Test Site - Small Boy sites. The presence and nature of

  16. Corrective Action Investigation Plan for Corrective Action Unit 571: Area 9 Yucca Flat Plutonium Dispersion Sites, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Bailey, Bernadine; Matthews, Patrick

    2013-07-01

    CAU 571 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 571, which comprises the following corrective action sites (CASs): • 09-23-03, Atmospheric Test Site S-9F • 09-23-04, Atmospheric Test Site T9-C • 09-23-12, Atmospheric Test Site S-9E • 09-23-13, Atmospheric Test Site T-9D • 09-45-01, Windrows Crater These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on March 6, 2013, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (now the Nevada Field Office). The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 571. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CAU 571 CASs are from nuclear testing activities. The DQO process resulted in an assumption that total effective dose (TED) within a default contamination boundary exceeds the final action level (FAL) and requires corrective action. The presence and nature of contamination outside the default

  17. Streamlined approach for environmental restoration plan for corrective action unit 416, Mud Pit, Project Shoal Area

    SciTech Connect

    1997-07-01

    This plan addresses the actions necessary for the restoration and closure of the Project Shoal Area (PSA), Surface Corrective Action Unit (CAU) 416, Mud Pit (Corrective Action Site No. 57-09-01), a pit that was used to store effluent produced during drilling of the Post-Shot Borehole PS-1 in 1963. This plan describes the activities that will occur at the site and the steps that will be taken to gather enough data to obtain a notice of completion from the Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented with the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996) and the Industrial Sites Quality Assurance Project Plan (DOE/NV, 1994). The SAFER process is being employed at this CAU where enough information exists about the nature and extent of contamination to propose an appropriate corrective action without completing a Corrective Action Decision Document and Corrective Action Plan. This process combines elements of the Data Quality Objective (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. This has already been completed for the mud pit so it will not be repeated here. The DQOs for the mud pit are presented in the Corrective Action Investigation Plan for Project Shoal Area, CAU No. 416 (DOE/NV, 1996). This observational approach provides a framework for managing uncertainty and planning decision making.

  18. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA

    SciTech Connect

    BECHTEL NEVADA

    2005-06-01

    Corrective Action Unit (CAU) 528: Polychlorinated Biphenyls Contamination is listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996) and is located in Area 25 of the Nevada Test Site. CAU 528 was created to address polychlorinated biphenyl (PCB) contamination identified during the CAU 262 corrective action investigation. CAU 528 consists of one Corrective Action Site (CAS): CAS 25-27-03, Polychlorinated Biphenyls Surface Contamination.

  19. 21 CFR 1316.95 - Petition for expedited release of a conveyance in a judicial forfeiture action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Petition for expedited release of a conveyance in a judicial forfeiture action. 1316.95 Section 1316.95 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION... action. (a) Where a conveyance has been seized and is being forfeited in a judicial proceeding for a...

  20. Presynaptic target of Ca2+ action on neuropeptide and acetylcholine release in Aplysia californica.

    PubMed

    Ohnuma, K; Whim, M D; Fetter, R D; Kaczmarek, L K; Zucker, R S

    2001-09-15

    1. When buccal neuron B2 of Aplysia californica is co-cultured with sensory neurons (SNs), slow peptidergic synapses are formed. When B2 is co-cultured with neurons B3 or B6, fast cholinergic synapses are formed. 2. Patch pipettes were used to voltage clamp pre- and postsynaptic neurons and to load the caged Ca2+ chelator o-nitrophenyl EGTA (NPE) and the Ca2+ indicator BTC into presynaptic neurons. The relationships between presynaptic [Ca2+]i and postsynaptic responses were compared between peptidergic and cholinergic synapses formed by cell B2. 3. Using variable intensity flashes, Ca2+ stoichiometries of peptide and acetylcholine (ACh) release were approximately 2 and 3, respectively. The difference did not reach statistical significance. 4. ACh quanta summate linearly postsynaptically. We also found a linear dose-response curve for peptide action, indicating a linear relationship between submaximal peptide concentration and response of the SN. 5. The minimum intracellular calcium concentrations ([Ca2+]i) for triggering peptidergic and cholinergic transmission were estimated to be about 5 and 10 microM, respectively. 6. By comparing normal postsynaptic responses to those evoked by photolysis of NPE, we estimate [Ca2+]i at the release trigger site elicited by a single action potential (AP) to be at least 10 microM for peptidergic synapses and probably higher for cholinergic synapses. 7. Cholinergic release is brief (half-width approximately 200 ms), even in response to a prolonged rise in [Ca2+]i, while some peptidergic release appears to persist for as long as [Ca2+]i remains elevated (for up to 10 s). This may reflect differences in sizes of reserve pools, or in replenishment rates of immediately releasable pools of vesicles. 8. Electron microscopy revealed that most synaptic contacts had at least one morphologically docked dense core vesicle that presumably contained peptide; these were often located within conventional active zones. 9. Both cholinergic and

  1. In vitro mechanism of action on insulin release of S-22068, a new putative antidiabetic compound

    PubMed Central

    Le Brigand, Laurence; Virsolvy, Anne; Manechez, Dominique; Godfroid, Jean-Jacques; Guardiola-Lemaître, Beatrice; Gribble, Fiona M; Ashcroft, Frances M; Bataille, Dominique

    1999-01-01

    The MIN6 cell line derived from in vivo immortalized insulin-secreting pancreatic β cells was used to study the insulin-releasing capacity and the cellular mode of action of S-22068, a newly synthesized imidazoline compound known for its antidiabetic effect in vivo.S-22068, was able to release insulin from MIN6 cells in a dose-dependent manner with a half-maximal stimulation at 100 μM. Its efficacy (8 fold over the basal value), which did not differ whatever the glucose concentration (stimulatory or not), was intermediate between that of sulphonylurea and that of efaroxan.Similarly to sulphonylureas and classical imidazolines, S-22068 blocked KATP channels and, in turn, opened nifedipine-sensitive voltage-dependent Ca2+ channels, triggering Ca2+ entry.Similarly to other imidazolines, S-22068 induced a closure of cloned KATP channels injected to Xenopus oocytes by interacting with the pore-forming Kir6.2 moiety.S-22068 did not interact with the sulphonylurea binding site nor with the non-I1 and non-I2 imidazoline site evidenced in the β cells that is recognized by the imidazoline compounds efaroxan, phentolamine and RX821002.We conclude that S-22068 is a novel imidazoline compound which stimulates insulin release via interaction with an original site present on the Kir6.2 moiety of the β cell KATP channels. PMID:10556939

  2. Release of exendin-4 is controlled by mechanical action in Gila monsters, Heloderma suspectum.

    PubMed

    Christel, Carolyn M; Denardo, Dale F

    2006-01-01

    Exendin-4 is a peptide produced exclusively by the salivary glands of the Gila Monster, Heloderma suspectum. Although exendin-4 is considered a venom component, circulating plasma levels of exendin-4 have been shown to increase in response to feeding. Previous studies using mammals have demonstrated exendin-4 has prolonged plasma glucose-lowering properties. While these findings suggest a possible role of exendin-4 as a metabolic hormone in the Gila Monster, the mechanism controlling its release by the salivary gland has not previously been studied. We investigated possible factors driving exendin-4 release by testing Gila Monsters' response to one of six treatment groups: fed egg, fed juvenile rat, gastric intubation with egg while under anesthesia, olfactory stimulation from egg without ingestion, unfed control, and biting without feeding. These treatments were designed to separately test actions associated with feeding and different food types. We measured plasma exendin-4 levels using an immunoenzymetric assay before and at three time points after each treatment. Exendin-4 levels increased significantly in groups where considerable biting occurred but not in the other treatment groups. These results suggest that exendin-4 is released from the salivary glands in response to mechanical stimulation and not the detection of food either by smell, taste, or distention of the gut. Further study of exendin-4 in its natural organism is needed to elucidate the functional role of exendin-4 as a venom component and/or a metabolic regulator.

  3. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs.

  4. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    SciTech Connect

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department

  5. National climate change action plans: Interim report for developing and transition countries

    SciTech Connect

    Benioff, R.; Ness, E.; Hirst, J.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  6. Grasping Motor Impairments in Autism: Not Action Planning but Movement Execution Is Deficient

    ERIC Educational Resources Information Center

    Stoit, Astrid M. B.; van Schie, Hein T.; Slaats-Willemse, Dorine I. E.; Buitelaar, Jan K.

    2013-01-01

    Different views on the origin of deficits in action chaining in autism spectrum disorders (ASD) have been posited, ranging from functional impairments in action planning to internal models supporting motor control. Thirty-one children and adolescents with ASD and twenty-nine matched controls participated in a two-choice reach-to-grasp paradigm…

  7. 78 FR 9028 - Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-07

    ... Animal and Plant Health Inspection Service Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Notice of... coming. FOR FURTHER INFORMATION CONTACT: Dr. Troy Bigelow, National Center for Animal Health Programs,...

  8. India's Action Plan for Wildlife Conservation and Role of Voluntary Bodies.

    ERIC Educational Resources Information Center

    Singh, Samar

    1985-01-01

    Describes India's National Action Plan for wildlife conservation, itemizing and explaining the main components and strategies of this action program. Also presents a historical perspective of conservation practices, policies, and programs. A table of India's national parks and sanctuaries with data from 1970 to 1983 is included. (ML)

  9. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  10. Combined Release and Radiation Effects Satellite (CRRES) Experiment: Educational planning and coordination

    NASA Technical Reports Server (NTRS)

    Vaughan, William W.; Alzmann, Melanie

    1991-01-01

    The efforts conducted to provide educational planning and development support for the Combined Release and Radiation Satellite (CRRES) Experiment are summarized. Activities regarding the scientific working group and workshop development are presented including the preparation of descriptive information on the CRRES Project.

  11. Record of Technical Change No.2 for ``Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada''

    SciTech Connect

    USDOE /NV

    1999-11-19

    This Record of Technical Change provides updates to the technical information included in ``Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada.''

  12. Combating Violence and Delinquency: The National Juvenile Justice Action Plan. Summary.

    ERIC Educational Resources Information Center

    Coordinating Council on Juvenile Justice and Delinquency Prevention, Washington, DC.

    This summary of the Coordinating Council on Juvenile Justice and Delinquency Prevention's "National Juvenile Justice Action Plan" presents innovative and effective strategies designed to reduce violence and victimization. The plan describes how communities can generate solutions and how individuals and groups can prevent or reduce…

  13. Implementing Governance for a New Era: An Action Plan for Higher Education Trustees

    ERIC Educational Resources Information Center

    American Council of Trustees and Alumni, 2014

    2014-01-01

    "Implementing Governance for a New Era" is an action plan to assist college and university trustees in reforming higher education. Delivered to more than 16,000 college and university trustees in November 2014, the plan provides details on how trustees properly represent the public by ensuring students receive a quality education at a…

  14. Empowering Parents in the College-Planning Process: An Action-Inquiry Case Study

    ERIC Educational Resources Information Center

    Hallett, Ronald E.; Griffen, Jacalyn

    2015-01-01

    Involving parents in the college-planning process is essential to increasing access for students from low-income communities of color. Using the action inquiry model, we explore how collaboration between a school district and a university can empower parents to engage in meaningful conversations and planning related to college access. This…

  15. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... could be deficient in offering services, opportunities, or benefits to minority groups and women, all areas of employment in which it could be deficient in the utilization of minority groups and women, and... of specific actions that will be taken to assure that no discrimination occurs in providing...

  16. National Action Plan Vision for 2025: A Framework for Change

    EPA Pesticide Factsheets

    This document establishes a goal of achieving all cost-effective energy efficiency by 2025 and presents 10 implementation goals as a framework for advancing the Action Plan’s five key policy recommendations which has been endorsed by many organizations.

  17. An Exploration of Pennsylvania Corrective Action Plans, 2006-2007

    ERIC Educational Resources Information Center

    Morgan-Davis, Carrie Lynn

    2013-01-01

    With the "No Child Left Behind Act of 2001" ("NCLB"), signed into law on January 8, 2002, schools nationwide have been challenged to improve student achievement. Several middle and junior high schools in the Commonwealth of Pennsylvania were identified as being in need of Corrective Action in 2006 based upon data from the…

  18. Action Planning for Personal Competitiveness in the "Broken Workplace."

    ERIC Educational Resources Information Center

    Feller, Richard W.

    1995-01-01

    The workplace and the psychological contract between employees and employer have structurally changed. Discusses realities of global economy and competitive workplace. Suggests ways counselors can help clients take action to enhance their personal competitiveness in the workplace such as understanding relationships between learning and work, and…

  19. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... State must take the following actions: (1) Data analysis. States must conduct data analysis such as... associated with improper payments. (2) Program analysis. States must review the findings of the data analysis... CMS, designed to reduce improper payments in each program based on its analysis of the error causes...

  20. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... State must take the following actions: (1) Data analysis. States must conduct data analysis such as... associated with improper payments. (2) Program analysis. States must review the findings of the data analysis... CMS, designed to reduce improper payments in each program based on its analysis of the error causes...

  1. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... State must take the following actions: (1) Data analysis. States must conduct data analysis such as... associated with improper payments. (2) Program analysis. States must review the findings of the data analysis... CMS, designed to reduce improper payments in each program based on its analysis of the error causes...

  2. Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David A. Strand

    2004-06-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

  3. Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No. 0

    SciTech Connect

    Robert F. Boehlecke

    2004-06-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

  4. Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada

    SciTech Connect

    D. L. Gustafason

    2001-02-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential.

  5. Florida Master Plan and Action Guide for Environmental Education.

    ERIC Educational Resources Information Center

    Tillis, C. Richard

    Specified in this master plan are many facets of the environmental problem-solving process which help visualize Florida's concern for its environment. This concern to preserve the riches of its natural resources and beauty has resulted from rapid growth and development necessitating the need to control and improve the quality of the environment.…

  6. A Time for Action: The Case for Interagency Deliberate Planning

    DTIC Science & Technology

    2008-01-01

    Taking Stock of Goldwater-Nichols,” Joint Force Quarterly 13 (Au­ tumn 1996): 10–14. 4. Ibid., 15. 5. Richard Meinhart , Strategic Planning by the...Chairmen, Joint Chiefs of Staff, 1990–2005 (Carlisle, PA: Strategic Studies Institute, Army War College, 2006), 4. 6. Locher, “Taking Stock of

  7. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... submitting a plan that provides for adequate protection of human health and the environment as determined by... will adequately protect human health, safety, and the environment. In making this determination, the... characteristics of the regulated substance, including its toxicity, persistence, and potential for migration;...

  8. Goal Plans of Action and Inferences During Comprehension of Narratives

    ERIC Educational Resources Information Center

    Trabasso, Tom; Wiley, Jennifer

    2005-01-01

    A theory of how readers monitor concerns of characters and make causal inferences during reading is presented. The focus is on the reader's understanding of what characters do when goals either succeed or fail. Knowledge of goal processes enable coherent understanding to be achieved when characters change goal plans and pursue new courses of…

  9. Homeland Security Strategic Research Action Plan 2012 - 2016

    EPA Pesticide Factsheets

    EPA’s Homeland Security research plan outline and how it will address science and technological gaps and improve the Agency’s ability to carry out its responsibilities associated with preparing for and responding to, terrorist attacks, and other disasters.

  10. Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Patrick Matthews

    2010-12-01

    Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for the CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The site will be investigated based on the data quality objectives (DQOs) developed on July 6, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for the Baneberry site. The primary release associated with Corrective Action Unit 365 was radiological contamination from the Baneberry nuclear test. Baneberry was an underground weapons-related test that vented significant quantities of radioactive gases from a fissure located in close proximity to ground zero. A crater formed shortly after detonation, which stemmed part of the flow from the fissure. The scope of this investigation includes surface and shallow subsurface (less than 15 feet below ground surface) soils. Radionuclides from the Baneberry test with the potential to impact groundwater are included within the Underground Test Area Subproject. Investigations and corrective actions associated with the Underground Test Area Subproject include the radiological inventory resulting from the Baneberry test.

  11. Determination of Nitrogen, Phosphorus, and Potassium Release Rates of Slow- and Controlled-Release Fertilizers: Single-Laboratory Validation, First Action 2015.15.

    PubMed

    Thiex, Nancy

    2016-01-01

    A previously validated method for the determination of nitrogen release patterns of slow- and controlled-release fertilizers (SRFs and CRFs, respectively) was submitted to the Expert Review Panel (ERP) for Fertilizers for consideration of First Action Official Method(SM) status. The ERP evaluated the single-laboratory validation results and recommended the method for First Action Official Method status and provided recommendations for achieving Final Action. The 180 day soil incubation-column leaching technique was demonstrated to be a robust and reliable method for characterizing N release patterns from SRFs and CRFs. The method was reproducible, and the results were only slightly affected by variations in environmental factors such as microbial activity, soil moisture, temperature, and texture. The release of P and K were also studied, but at fewer replications than for N. Optimization experiments on the accelerated 74 h extraction method indicated that temperature was the only factor found to substantially influence nutrient-release rates from the materials studied, and an optimized extraction profile was established as follows: 2 h at 25°C, 2 h at 50°C, 20 h at 55°C, and 50 h at 60°C.

  12. The role of immediate and final goals in action planning: an fMRI study.

    PubMed

    Majdandzić, Jasminka; Grol, Meike J; van Schie, Hein T; Verhagen, Lennart; Toni, Ivan; Bekkering, Harold

    2007-08-15

    To interact effectively with our environment, we need to specify the intended outcomes (goals) of our actions. In this process, immediate goals and final goals can be regarded as different levels within a hierarchically organized system for action planning: immediate goals and movement details are selected to accomplish more remote goals. Behavioral studies support this notion of different levels of action planning, but the neurophysiological basis remains unclear. Using fMRI, we examined the neural correlates of preparing object manipulations based on either the desired end-state (the final goal) or the initial movement towards a target (the immediate goal). Subjects had to insert an object (consisting of a large and a small cube) into one of two corresponding large and small slots. The subjects were cued on either which slot to fill (Final Goal trials) or which object part to grasp (Immediate Goal trials). These actions required similar movements, but different planning. During Final Goal trials, there was differential preparatory activity along the superior frontal gyrus (bilaterally) and in left inferior parietal cortex. Immediate Goal trials evoked differential activity in occipito-parietal and occipito-temporal cortex. These findings support the notion that actions can be planned at different levels. We show that different fronto-parietal circuits plan the same action, by a relative emphasis on either selecting a sequence of movements to achieve a desired end-state, or selecting movements spatially compatible with given object properties.

  13. 300-FF-1 remedial design report/remedial action work plan

    SciTech Connect

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  14. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    SciTech Connect

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  15. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  16. Corrective Action Investigation Plan for Corrective Action Unit 266: Area 25 Building 3124 Leachfield, Nevada Test Site, Nevada, Revision 1, February 1999

    SciTech Connect

    U.S. Department Of Energy, Nevada Operations Office

    1999-02-24

    The Corrective Action Investigation Plan for Corrective Action Unit 266, Area 25 Building 3124 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U.S. Department of Defense. Corrective Action Unit 266 consists of the Corrective Action Site 25-05-09 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 266. Corrective Action Unit 266 is located southwest of Building 3124 which is located southwest and adjacent to Test Cell A. Test Cell A was operational during the 1960s to test nuclear rocket reactors in support of the Nuclear Rocket Development Station. Operations within Building 3124 from 1962 through the early 1990s resulted in effluent releases to the leachfield and associated collection system. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with Test Cell A reactor testing operations, various laboratories including a high-level radioactivity environmental sample handling laboratory, and possibly the Treatability Test Facility. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include radionuclides, oil/diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. Samples will also be analyzed for radionuclides and polychlorinated biphenyls not

  17. Corrective Action Investigation Plan for Corrective Action Unit 261: Test Cell A Leachfield System, Nevada Test Site, Nevada UPDATED WITH TECHNICAL CHANGE No.1

    SciTech Connect

    DOE /NV

    1998-09-18

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (FFACO, 1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 261, the Area 25 Test Cell A Leachfield System, which is located in Area 25 at the Nevada Test Site (NTS). The NTS is approximately 88 kilometers (km) (55 miles [mi]) northwest of Las Vegas, Nevada. As presented, CAU 261 is comprised of CASs 25-05-01 and 25-05-07, respectively known as the Leachfield and the Acid Waste Leach Pit (AWLP) (FFACO, 1996). The leachfield is an area with dimensions of approximately 23 by 17 meters (m) (75 by 55 feet [ft]) and is located south of Building 3124, which is southwest and adjacent to Test Cell A. Test Cell A was operational during the 1960s to test nuclear rocket reactors in support of the Nuclear Rocket Development Station (NRDS) (SNPO, 1970). Various operations within Building 3124, from 1962 through 1972, have resulted in liquid waste releases to the leachfield and the AWLP (DOE, 1988a). The surface and subsurface soils in the vicinity of the collection system and leachfield have potentially been

  18. Low Energy Demonstration Accelerator mitigation action plan annual report for 1998

    SciTech Connect

    Tomei, T.; Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Low Energy Demonstration Accelerator Facility (LEDA) Mitigation Action Plan (MAP). This MAPAR primarily provides a status on specific LEDA facility construction- and operations-related mitigation actions that have been implemented during 1998. The mitigation actions are implemented in order to comply with regulatory requirements under the National Environmental Policy Act (NEPA) by fulfilling DOE`s commitments under the LEDA MAP. This report contains the following three main sections: Introduction; LEDA MAP scope, schedule and status; and Summary and Recommendations. The Introduction section provides a background regarding the origin and purpose of the LEDA MAP. The LEDA MAP scope, schedule, and status section provides a more detailed description of each mitigation action commitment and the current status of each associated action plan. Finally, the Summary and Recommendations section provides DOE`s recommendation regarding future implementation based on the status of each commitment action plan.

  19. Corrective Action Investigation Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada: Revision 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-05-03

    The general purpose of this Corrective Action Investigation Plan is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective action alternatives (CAAs) for Corrective Action Unit (CAU) 543: Liquid Disposal Units, Nevada Test Site (NTS), Nevada. Located in Areas 6 and 15 on the NTS, CAU 543 is comprised of a total of seven corrective action sites (CASs), one in Area 6 and six in Area 15. The CAS in Area 6 consists of a Decontamination Facility and its components which are associated with decontamination of equipment, vehicles, and materials related to nuclear testing. The six CASs in Area 15 are located at the U.S. Environmental Protection Agency Farm and are related to waste disposal activities at the farm. Sources of possible contamination at Area 6 include potentially contaminated process waste effluent discharged through a process waste system, a sanitary waste stream generated within buildings of the Decon Facility, and radiologically contaminated materials stored within a portion of the facility yard. At Area 15, sources of potential contamination are associated with the dairy operations and the animal tests and experiments involving radionuclide uptake. Identified contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, petroleum hydrocarbons, pesticides, herbicides, polychlorinated biphenyls, metals, and radionuclides. Three corrective action closure alternatives - No Further Action, Close in Place, or Clean Closure - will be recommended for CAU 543 based on an evaluation of all the data quality objective-related data. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of CAAs that will be presented in the Corrective Action Decision Document.

  20. Action planning and position sense in children with Developmental Coordination Disorder.

    PubMed

    Adams, Imke L J; Ferguson, Gillian D; Lust, Jessica M; Steenbergen, Bert; Smits-Engelsman, Bouwien C M

    2016-04-01

    The present study examined action planning and position sense in children with Developmental Coordination Disorder (DCD). Participants performed two action planning tasks, the sword task and the bar grasping task, and an active elbow matching task to examine position sense. Thirty children were included in the DCD group (aged 6-10years) and age-matched to 90 controls. The DCD group had a MABC-2 total score ⩽5th percentile, the control group a total score ⩾25th percentile. Results from the sword-task showed that children with DCD planned less for end-state comfort. On the bar grasping task no significant differences in planning for end-state comfort between the DCD and control group were found. There was also no significant difference in the position sense error between the groups. The present study shows that children with DCD plan less for end-state comfort, but that this result is task-dependent and becomes apparent when more precision is needed at the end of the task. In that respect, the sword-task appeared to be a more sensitive task to assess action planning abilities, than the bar grasping task. The action planning deficit in children with DCD cannot be explained by an impaired position sense during active movements.

  1. Issues concerning a diagnostic study of an action plan for the San Juan river basin

    NASA Astrophysics Data System (ADS)

    Yamaguchi, Hiromi; Futamura, Hisanori; Nakayama, Mikiyasu

    2004-11-01

    An action plan is being formulated for the San Juan River basin, shared by Costa Rica and Nicaragua in Central America. The action plan is assumed to be a planning tool designed to ensure the availability of the goods and services that water resources provide for the conservation of ecosystems and for social and economic development. Development of the action plan comprises two phases, namely elaboration of the diagnostic study and drafting of the action plan. The diagnostic study was published in 1997. After examining previous cases in international water systems, for which the diagnostic study was developed as the precursor of an action plan, the author felt that the existing diagnostic study for the San Juan River basin still had room for improvements, in particular in the following aspects: (a) inventory of past, ongoing and future projects; (b) impacts of reserved areas on the basin as a whole; (c) instruments to promote public participation; (d) support by central decision makers; (e) mechanisms for information transparency. These aspects, which need enhancements, seem to suggest that more emphasis should be put on the soft aspects of the sciences. While the diagnostic study addresses issues of natural environment in detail, both data and analysis of human environments are in low profile. The lesson gained from the Zambezi River basin project is that lack of a proper strategy and political commitments by the central decision makers (of the riparian states) will lead to an impasse in implementation of the project, due mainly to paucity of support within basin countries. Lack of support by the general public may also lead to a failure in the implementation phase. These aspects should have been sufficiently addressed in the diagnostic study, so that appropriate actions (to be listed in the action plan) should be elaborated for implementation.

  2. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0

    SciTech Connect

    Wickline, Alfred

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action

  3. 77 FR 38296 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... for Disease Control and Prevention (CDC), Department of Health and Human Services (HHS). ACTION... (CDC), located within the Department of Health and Human Services (HHS) published a notice in the... be received on or before June 15, 2012. HHS/CDC has received a request asking for a 30 day...

  4. Does Your Planning Communicate Action? Or, Is Your Strategic Plan a Coffee Table Book?

    ERIC Educational Resources Information Center

    Osborn, Frances P.

    Monroe Community College (MCC) has been involved in strategic planning over the last 4 years. The following lessons have been drawn from these 4 years of experience: (1) all plans need to be seen as temporary; (2) no plan drawn up in the planner's office could be implemented if it ignored the fleeting, ambiguous nature of the college's and…

  5. The action of antidepressants on the glutamate system: regulation of glutamate release and glutamate receptors.

    PubMed

    Musazzi, Laura; Treccani, Giulia; Mallei, Alessandra; Popoli, Maurizio

    2013-06-15

    Recent compelling evidence has suggested that the glutamate system is a primary mediator of psychiatric pathology and also a target for rapid-acting antidepressants. Clinical research in mood and anxiety disorders has shown alterations in levels, clearance, and metabolism of glutamate and consistent volumetric changes in brain areas where glutamate neurons predominate. In parallel, preclinical studies with rodent stress and depression models have found dendritic remodeling and synaptic spines reduction in corresponding areas, suggesting these as major factors in psychopathology. Enhancement of glutamate release/transmission, in turn induced by stress/glucocorticoids, seems crucial for structural/functional changes. Understanding mechanisms of maladaptive plasticity may allow identification of new targets for drugs and therapies. Interestingly, traditional monoaminergic-based antidepressants have been repeatedly shown to interfere with glutamate system function, starting with modulation of N-methyl-D-aspartate (NMDA) receptors. Subsequently, it has been shown that antidepressants reduce glutamate release and synaptic transmission; in particular, it was found antidepressants prevent the acute stress-induced enhancement of glutamate release. Additional studies have shown that antidepressants may partly reverse the maladaptive changes in synapses/circuitry in stress and depression models. Finally, a number of studies over the years have shown that these drugs regulate glutamate receptors, reducing the function of NMDA receptors, potentiating the function of α-amino-3-hydroxy-5-methyl-4-isoxazole-propionic acid receptors, and, more recently, exerting variable effects on different subtypes of metabotropic glutamate receptors. The development of NMDA receptor antagonists has opened new avenues for glutamatergic, rapid acting, antidepressants, while additional targets in the glutamate synapse await development of new compounds for better, faster antidepressant action.

  6. Corrective Action Investigation Plan for Corrective Action Unit 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada, with ROTC 1 Revision 0

    SciTech Connect

    Matthews, Patrick K.

    2013-07-01

    Corrective Action Unit (CAU) 567 is located in Areas 1, 3, 5, 20, and 25 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 567 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 567, which comprises the following corrective action sites (CASs): • 01-23-03, Atmospheric Test Site T-1 • 03-23-25, Seaweed E Contamination Area • 05-23-07, A5b RMA • 20-23-08, Colby Mud Spill • 25-23-23, J-11 Soil RMA These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on May 6, 2013, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 567. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CAU 567 releases are nuclear test operations and other NNSS operations. The DQO process resulted in an assumption that total effective dose (TED) within a default contamination boundary

  7. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2006-09-01

    Corrective Action Unit (CAU) 543, Liquid Disposal Units, is listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. CAU 543 consists of seven Corrective Action Sites (CASs) located in Areas 6 and 15 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven CASs: {sm_bullet} CAS 06-07-01, Decon Pad {sm_bullet} CAS 15-01-03, Aboveground Storage Tank {sm_bullet} CAS 15-04-01, Septic Tank {sm_bullet} CAS 15-05-01, Leachfield {sm_bullet} CAS 15-08-01, Liquid Manure Tank {sm_bullet} CAS 15-23-01, Underground Radioactive Material Area {sm_bullet} CAS 15-23-03, Contaminated Sump, Piping From January 24, 2005 through April 14, 2005, CAU 543 site characterization activities were conducted, and are reported in Appendix A of the CAU 543 Corrective Action Decision Document (CADD) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2005). The recommended corrective action as stated in the approved CADD is No Further Action for five of the CAU 543 CASs, and Closure In Place for the remaining two CASs.

  8. Population attributable fraction: planning of diseases prevention actions in Brazil

    PubMed Central

    de Rezende, Leandro Fórnias Machado; Eluf, José

    2016-01-01

    ABSTRACT Epidemiology is the study of occurrence, distribution and determinants of health-related events, including the application of that knowledge to the prevention and control of health problems. However, epidemiological studies, in most cases, have limited their research questions to determinants of health outcomes. Research related to the application of knowledge for prevention and control of diseases have been neglected. In this comment, we present a description of how population attributable fraction estimates can provide important elements for planning of prevention and control of diseases in Brazil. PMID:27305404

  9. DOUBLE TRACKS Test Site interim corrective action plan

    SciTech Connect

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  10. Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada

    SciTech Connect

    K. B. Campbell

    2002-04-01

    Corrective Action Unit (CAU) 490, Station 44 Burn Area is located on the Tonopah Test Range (TTR). CAU 490 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and includes for Corrective Action Sites (CASs): (1) Fire Training Area (CAS 03-56-001-03BA); (2) Station 44 Burn Area (CAS RG-56-001-RGBA); (3) Sandia Service Yard (CAS 03-58-001-03FN); and (4) Gun Propellant Burn Area (CAS 09-54-001-09L2).

  11. A Comprehensive Action Plan Information System: A Tool for Tracking and Mapping Quality of Life Action Implementation and Planning

    ERIC Educational Resources Information Center

    Krebs, Peter; Holden, Bill; Williams, Allison; Basualdo, Maria; Spence, Cara

    2008-01-01

    Since its inception, the Community-University Institute for Social Research (CUISR) has been involved in a participatory process aimed at understanding the quality of life in Saskatoon. Informed by the results of Quality of Life (QoL) survey in 2001 and by a list of QoL action priorities from a community forum, the CUISR QoL module set out to…

  12. Corrective Action Investigation Plan for Corrective Action Unit 555: Septic Systems Nevada Test Site, Nevada, Rev. No.: 0 with Errata

    SciTech Connect

    Pastor, Laura

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada, and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI

  13. The Search Conference as a Method in Planning Community Health Promotion Actions

    PubMed Central

    Magnus, Eva; Knudtsen, Margunn Skjei; Wist, Guri; Weiss, Daniel; Lillefjell, Monica

    2016-01-01

    Aims: The aim of this article is to describe and discuss how the search conference can be used as a method for planning health promotion actions in local communities. Design and methods: The article draws on experiences with using the method for an innovative project in health promotion in three Norwegian municipalities. The method is described both in general and how it was specifically adopted for the project. Results and conclusions: The search conference as a method was used to develop evidence-based health promotion action plans. With its use of both bottom-up and top-down approaches, this method is a relevant strategy for involving a community in the planning stages of health promotion actions in line with political expectations of participation, ownership, and evidence-based initiatives. Significance for public health This article describe and discuss how the Search conference can be used as a method when working with knowledge based health promotion actions in local communities. The article describe the sequences of the conference and shows how this have been adapted when planning and prioritizing health promotion actions in three Norwegian municipalities. The significance of the article is that it shows how central elements in the planning of health promotion actions, as participation and involvements as well as evidence was a fundamental thinking in how the conference were accomplished. The article continue discussing how the method function as both a top-down and a bottom-up strategy, and in what way working evidence based can be in conflict with a bottom-up strategy. The experiences described can be used as guidance planning knowledge based health promotion actions in communities. PMID:27747199

  14. Corrective Action Investigation Plan for Corrective Action Unit 190: Contaminated Waste Sites Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    Wickline, Alfred

    2006-12-01

    , to determine the potential for a release; (7) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes; and (8) Collect quality control samples. This Corrective Action Investigation Document (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, U.S. Department of Energy, and U.S. Department of Defense. Under the FFACO, this CAIP will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval.

  15. Response Action Plan for the Basin F Interim Response Action Waste Pile.

    DTIC Science & Technology

    1992-10-01

    requirements of the Resource Conservation I and Recovery Act (RCRA), as amended by the 1984 Hazardous and Solid Waste Amendments and the i Colorado Hazardous...submittal process. Action Leakage Rate (ALR) S Background EPA has historically used the term de minimus In the Hazardous and Solid Waste Amendments leakage

  16. Renewable energy plan of action for American Samoa

    SciTech Connect

    Shupe, J.W. . Pacific Site Office); Stevens, J.W. )

    1990-11-01

    American Samoa has no indigenous fossil fuels and is almost totally dependent for energy on seaborne petroleum. However, the seven Pacific Islands located at 14 degrees south latitude that constitute American Samoa have a wide variety of renewable resources with the potential for substituting for imported oil. Included as possible renewable energy conversion technologies are solar thermal, photovoltaics, wind, geothermal, ocean thermal, and waste-to-energy recovery. This report evaluates the potential of each of these renewable energy alternatives and establishes recommended priorities for their development in American Samoa. Rough cost estimates are also included. Although renewable energy planning is highly site specific, information in this report should find some general application to other tropical insular areas.

  17. [Remedial action plan for the codisposal and stabilization of the Monument Valley and Mexican Hat uranium mill tailings at Mexican Hat, Utah]. Appendix F, Groundwater hydrology calculations

    SciTech Connect

    1993-12-31

    This document contains the ground water hydrology calculations for the remedial action plan for the codisposal and stabilization of uranium mill tailings at Mexican Hat, Utah. Included are calculations for the following: slug test analyses for monitor wells, analyses of packer tests, hydraulic gradients and ground water velocities, volume of released water, aquifer pumping test analysis, slug test analysis to determine hydraulic conductivity, and gradient calculations.

  18. Corrective Action Investigation Plan for Corrective Action Unit 309: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David A. Strand

    2004-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 309, Area 12 Muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD). Corrective Action Unit 309 is located in Area 12 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 mi beyond the main gate to the NTS. Corrective Action Unit 309 is comprised of the three Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: CAS 12-06-09, Muckpile; CAS 12-08-02, Contaminated Waste Dump (CWD); and CAS 12-28-01, I, J, and K-Tunnel Debris. Corrective Action Sites 12-06-09 and 12-08-02 will be collectively referred to as muckpiles in this document. Corrective Action Site 12-28-01 will be referred to as the fallout plume because of the extensive lateral area of debris and fallout contamination resulting from the containment failures of the J-and K-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and media sampling, where appropriate. Data will also be obtained to support waste management decisions. The CASs in CAU 309 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and/or the environment. Existing information on the nature and extent of potential contamination at these sites are insufficient to evaluate and recommend corrective action alternatives for the CASs. Therefore, additional information will be obtained by conducting a CAI prior to evaluating corrective action

  19. The Search Conference as a Method in Planning Community Health Promotion Actions.

    PubMed

    Magnus, Eva; Knudtsen, Margunn Skjei; Wist, Guri; Weiss, Daniel; Lillefjell, Monica

    2016-08-19

    Aims: The aim of this article is to describe and discuss how the search conference can be used as a method for planning health promotion actions in local communities. Design and methods: The article draws on experiences with using the method for an innovative project in health promotion in three Norwegian municipalities. The method is described both in general and how it was specifically adopted for the project. Results and conclusions: The search conference as a method was used to develop evidence-based health promotion action plans. With its use of both bottom-up and top-down approaches, this method is a relevant strategy for involving a community in the planning stages of health promotion actions in line with political expectations of participation, ownership, and evidence-based initiatives.

  20. [Guidelines for employment policies in Europe and national action plans: opportunities for people with disabilities].

    PubMed

    Niehaus, M

    2000-06-01

    The scourge of unemployment has been roundly identified throughout Europe as the most pressing social and economic problem on the current political agenda. At Luxembourg in November 1997, the European Jobs Summit brought Europe's leaders together in an historic occasion that mapped out employment guidelines for Europe. The Luxembourg Jobs Summit agreed a set of guidelines for the Member States employment policy under four pillars, employability, entrepreneurship, adaptability, and equal opportunities. One guideline referred to promoting integration of people with disabilities into working life. The Member States subsequently agreed to incorporate the Guidelines into national employment action plans. The question of this paper is, to what extent do employment guidelines and National Action Plans improve the opportunities of disabled persons? This paper seeks to establish a set of fundamental issues concerning employment and disability. Included in this analysis are recommendations in order to achieve a better presence of disabled people in National Action Plans in future.

  1. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1987-05-01

    This appendix assesses the present conditions and data for the inactive uranium mill site near Tuba City, Arizona. It consolidates available engineering, radiological, geotechnical, hydrological, meterological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill and tailings site so that the Remedial Action Contractor (RAC) may complete final designs of the remedial actions.

  2. LABCORE post release 1.0 development system project management plan

    SciTech Connect

    Rich, H.S.

    1994-09-29

    The LABCORE post release 1.0 development system project management plan (SPMP) is the primary planning document governing the development of specific enhancements to the LABCORE project. The mission of the Westinghouse Hanford Company (WHC) laboratories is changing from supporting the 200 Area chemical processing plants for process control, waste management, and effluent monitoring to supporting environmental restoration and regulatory compliance commitments. The LABCORE program was implemented as the key element for meeting the commitments by upgrading the laboratories through the implementation of an Automated Data Processing improvement program in January 1994. Scope for LABCORE release 1.0 consisted of hardware and software implementation required to support a minimum number of analyses (Single-Shell Tank [SST] analysis at 222S Laboratory and Performance Evaluation samples at the Waste Sampling Characterization Facility laboratory) using manual entry of data, and to support routine laboratory functions, common to all laboratories. LABCORE post release 1.0 enhancements will expand the functionality presented to the laboratory. Post release 1.0 enhancements will also address the integration of a database for Analytical Services Program Integration, budgeting, and scheduling offices into LABCORE.

  3. A Resiliency Action Plan for the National Renewable Energy Laboratory: May 23, 2014 -- June 5, 2015

    SciTech Connect

    Vogel, J; Wagner, C.; Renfrow, S.

    2015-09-03

    The second stage in a two-stage project called the National Renewable Energy Laboratory (NREL) Climate Change Resiliency and Preparedness (CCRP) project is summarized in this resiliency action plan. This CCRP pilot project was funded by the U.S. Department of Energy's Sustainability Performance Office and launched in winter 2014. The resiliency action plan begins where the previous stage of the project -- the vulnerability assessment -- ended. This report discusses resiliency options to reduce the risk of the highest risk vulnerabilities that were identified in the NREL vulnerability assessment.

  4. Documentation of a model action plan to deter illicit nuclear trafficking

    SciTech Connect

    Smith, D. K.; Kristo, M. J.; Niemeyer, S.; Dudder, Gordon B.

    2008-05-04

    Theft, illegal possession, smuggling, or attempted unathorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures.

  5. Final Action Plan to Tiger Team. Environmental, safety and health assessment

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  6. Corrective action investigation plan for Project Shoal Area CAU No. 416

    SciTech Connect

    1996-08-01

    This Corrective Action Investigation Plan (CAIP) is part of an ongoing US Department of Energy (DOE)-funded project for the investigation of Corrective Action Unit (CAU) No. 416, Project Shoal Area (PSA). Project Shoal was conducted to determine whether seismic waves produced by underground nuclear testing could be differentiated from naturally occurring earthquakes. The PSA site is located approximately 30 miles southeast of Fallon, Nevada, in the northern portion of Sand Springs Mountains in Churchill County. This CAIP will be implemented in accordance with the Federal Facility Agreement and Consent Order, the Industrial Sites Quality Assurance Project Plan, and all applicable Nevada Division of Environmental Protection policies and regulations.

  7. Documentation of a Model Action Plan to Deter Illicit Nuclear Trafficking

    SciTech Connect

    Smith, D; Kristo, M; Niemeyer, S; Dudder, G

    2006-07-28

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures.

  8. 75 FR 36551 - State Highway-Rail Grade Crossing Action Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ...This final rule complies with a statutory mandate that the Secretary of Transportation (Secretary) issue a rule to require the ten States with the most highway-rail grade crossing collisions, on average, over the past three years, to develop State highway-rail grade crossing action plans. The final rule addresses the development, review, and approval of these highway-rail grade crossing action......

  9. Corrective Action Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5 Tonopah Test Range, Nevada

    SciTech Connect

    D. S. Tobiason

    2000-08-01

    Area 3 Septic Waste Systems 1 and 5 are located in Area 3 of the Tonopah Test Range (TTR) (Figure 1). The site is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as Corrective Action Unit (CAU) 428 and includes Corrective Action Sites 03-05-002-SW01 (Septic Waste System 1 [SWS 1]), and 03-05-002-SW05 (Septic Waste System 5 [SWS 5]). The site history for the CAU is provided in the Corrective Action Investigation Plan (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999). SWS 1 consists of two leachfields and associated septic tanks. SWS 1 received effluent from both sanitary and industrial sources from various buildings in Area 3 of the TTR (Figure 2). SWS 5 is comprised of one leachfield and outfall with an associated septic tank. SWS 5 received effluent from sources in Building 03-50 in Area 3 of the TTR (Figure 2). Both systems were active until 1990 when a consolidated sewer system was installed. The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 3 SWS 1 and 5. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during May and June 1999. Samples of the tank contents, leachfield soil, and soil under the tanks and pipes were collected. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE/NV, 2000). Additional sampling was done in May 2000, the results of which are presented in this plan. Soil sample results indicated that two constituents of concern were detected above Preliminary Action Levels (PALs). Total arsenic was detected at a concentration of 68.7 milligrams per kilogram (mg/kg). The arsenic was found under the center distribution line at the proximal end of the SWS 5 Leachfield (Figure 3). Total benzo(a)pyrene was detected at a concentration of 480 micrograms per kilogram ({micro}g/kg). The benzo(a)pyrene was found in the soil under the

  10. Beyond static and dynamic risk factors: the incremental validity of release planning for predicting sex offender recidivism.

    PubMed

    Scoones, Carwyn D; Willis, Gwenda M; Grace, Randolph C

    2012-01-01

    Both desistance research and strengths-based approaches to offender rehabilitation suggest that attempts to reduce sex offender recidivism should attend to an offender's release environment. Recent research has demonstrated that better quality release planning is associated with reduced recidivism; however, whether release planning contributes significant incremental validity in predicting recidivism over and above static and dynamic risk factors is unclear. In the present study, release planning was retrospectively assessed for a sample of child molesters (n = 196) who had been released into the community following completion of a prison-based treatment program and its relative contribution to recidivism risk prediction was investigated. The average follow-up period was 11.08 years, during which 13.3% of the sample were convicted of a new sexual offence. Hierarchical Cox regression analyses showed that release planning contributed additional predictive validity for sexual recidivism after controlling for static and dynamic risk factors. Findings suggest that assessment of release planning might improve accuracy of sex offender risk assessments and that improved release planning should contribute to reductions in recidivism.

  11. Corrective Action Plan for Corrective Action Unit 254: Area 25 R-MAD Decontamination Facility Nevada Test Site, Nevada

    SciTech Connect

    C. M. Obi

    2000-12-01

    The Area 25 Reactor Maintenance, Assembly, and Disassembly Decontamination Facility is identified in the Federal Facility Agreement and Consent Order (FFACO) as Corrective Action Unit (CAU) 254. CAU 254 is located in Area 25 of the Nevada Test Site and consists of a single Corrective Action Site CAS 25-23-06. CAU 254 will be closed, in accordance with the FFACO of 1996. CAU 254 was used primarily to perform radiological decontamination and consists of Building 3126, two outdoor decontamination pads, and surrounding soil within an existing perimeter fence. The site was used to decontaminate nuclear rocket test-car hardware and tooling from the early 1960s through the early 1970s, and to decontaminate a military tank in the early 1980s. The site characterization results indicate that, in places, the surficial soil and building materials exceed clean-up criteria for organic compounds, metals, and radionuclides. Closure activities are expected to generate waste streams consisting of nonhazardous construction waste. petroleum hydrocarbon waste, hazardous waste, low-level radioactive waste, and mixed waste. Some of the wastes exceed land disposal restriction limits and will require off-site treatment before disposal. The recommended corrective action was revised to Alternative 3- ''Unrestricted Release Decontamination, Verification Survey, and Dismantle Building 3126,'' in an addendum to the Correction Action Decision Document.

  12. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    SciTech Connect

    Haagenstad, H.T.

    1998-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP). This MAPAR provides a status on specific DARHT facility design- and construction-related mitigation actions that have been initiated in order to fulfill DOE`s commitments under the DARHT MAP. The functions of the DARHT MAP are to (1) document potentially adverse environmental impacts of the Phased Containment Option delineated in the Final EIS, (2) identify commitments made in the Final EIS and ROD to mitigate those potential impacts, and (3) establish Action Plans to carry out each commitment (DOE 1996). The DARHT MAP is divided into eight sections. Sections 1--5 provide background information regarding the NEPA review of the DARHT project and an introduction to the associated MAP. Section 6 references the Mitigation Action Summary Table which summaries the potential impacts and mitigation measures; indicates whether the mitigation is design-, construction-, or operational-related; the organization responsible for the mitigation measure; and the projected or actual completion data for each mitigation measure. Sections 7 and 8 discuss the Mitigation Action Plan Annual Report and Tracking System commitment and the Potential Impacts, Commitments, and Action Plans respectively. Under Section 8, potential impacts are categorized into five areas of concern: General Environment, including impacts to air and water; Soils, especially impacts affecting soil loss and contamination; Biotic Resources, especially impacts affecting threatened and endangered species; Cultural/Paleontological Resources, especially impacts affecting the archeological site known as Nake`muu; and Human Health and Safety, especially impacts pertaining to noise and radiation. Each potential impact includes a brief statement of the nature of the impact and its cause(s). The commitment

  13. Phase II -- Photovoltaics for Utility Scale Applications (PVUSA): Safety and health action plan

    SciTech Connect

    Berg, K.

    1994-09-01

    To establish guidelines for the implementation and administration of an injury and illness prevention program for PVUSA and to assign specific responsibilities for the execution of the program. To provide a basic Safety and Health Action Plan (hereinafter referred to as Plan) that assists management, supervision, and project personnel in the recognition, evaluation, and control of hazardous activities and/or conditions within their respective areas of responsibility.

  14. Medical planning for toxic releases into the community: the example of chlorine gas.

    PubMed Central

    Baxter, P J; Davies, P C; Murray, V

    1989-01-01

    Emergency planning for a major accidental release of chlorine gas from industrial installations into the community is outlined for emergency services and hospitals. Realistic planning has been made possible with the advent of computer models for gas dispersion which may be used to estimate the numbers of deaths and casualties, according to their severity. For most purposes sufficient accuracy may be obtained by using a small number of computer analyses for the most serious reasonably foreseeable events under typical day and night weather conditions, and allowing for the emergency response to be scaled up or down according to the size of an actual release. In highly populated areas triage should be preplanned to deal with a large number of victims; field stations will be needed for the treatment and observation of minor casualties. The management and treatment of casualties is summarised. The best protection against a gas cloud is afforded by buildings whose windows, doors, and ventilation systems have been closed. Hospitals in the vicinity of an installation should draw up plans to protect patients and staff. Coordination in a disaster will require toxicological and epidemiological expertise and hospital plans should allow for this. PMID:2713283

  15. Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiments)

    SciTech Connect

    Cooper, W.E.

    2000-09-29

    undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before the formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating SNM into future experiments, the team will convene again as part of the process of authorizing those activities.

  16. Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiment)

    SciTech Connect

    Cooper, W E

    2000-12-05

    undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before the formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating SNM into future experiments, the team will convene again as part of the process of authorizing those activities.

  17. Corrective Action Plan for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit Nevada Test Site, Nevada

    SciTech Connect

    K. B. Campbell

    2002-10-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 335, Area 6 Injection Well and Drain Pit, in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (CADD). However, there is one modification to the selected alternative. Due to the large area that would require fencing, it is proposed that instead of fencing, an appropriate number of warning signs attached to tee posts be used to delineate the use restriction area. CAU 335 is located in Area 6 of the Nevada Test Site (NTS) which is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada. CAU 335 is located in the Area 6 Well 3 Yard approximately 39 km (24 mi) north of Mercury, on the Mercury Highway and several hundred feet (ft) west along Road 6-06. CAU 335 consists of the following three Corrective Action Sites (CASs): CAS 06-20-01, Drums, Oil Waste, Spill; CAS 06-20-02, 20-inch Cased Hole; CAS 06-23-03, Drain Pit. The site history for CAU 335 is provided in the Corrective Action Investigation Plan (DOE/NV, 2000). Briefly, CAS 06-20-01, was used for storing material that was pumped out of CAS 06-20-02 and placed into four 208-liter (L) (55-gall [gal]) drums. The drums were taken to the NTS Area 5 Hazardous Waste Accumulation Site in 1991. CAS 06-20-01 will be closed with no further action required. Any spills associated with CAS 06-20-01 are addressed and considered part of CAS 06-20-02. CAS 06-20-02 was used for disposal of used motor oil, wastewater, and debris for an undetermined amount of time. In 1991, the casing was emptied of its contents, excavated, and backfilled. CAS 06-23-03 was used as a depository for effluent waste from truck-washing activities from 1960-1991.

  18. Corrective action investigation plan for CAU Number 453: Area 9 Landfill, Tonopah Test Range

    SciTech Connect

    1997-05-14

    This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and criteria for conducting site investigation activities at the Area 9 Landfill, Corrective Action Unit (CAU) 453/Corrective Action (CAS) 09-55-001-0952, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, Nevada. The Area 9 Landfill is located northwest of Area 9 on the TTR. The landfill cells associated with CAU 453 were excavated to receive waste generated from the daily operations conducted at Area 9 and from range cleanup which occurred after test activities.

  19. Corrective Action Investigation Plan for Corrective Action Unit 409: Other Waste Sites, Tonopah Test Range, Nevada (Rev. 0)

    SciTech Connect

    DOE /NV

    2000-10-05

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 409 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 409 consists of three Corrective Action Sites (CASs): TA-53-001-TAB2, Septic Sludge Disposal Pit No.1; TA-53-002-TAB2, Septic Sludge Disposal Pit No.2; and RG-24-001-RGCR, Battery Dump Site. The Septic Sludge Disposal Pits are located near Bunker Two, close to Area 3, on the Tonopah Test Range. The Battery Dump Site is located at the abandoned Cactus Repeater Station on Cactus Peak. The Cactus Repeater Station was a remote, battery-powered, signal repeater station. The two Septic Sludge Disposal Pits were suspected to be used through the late 1980s as disposal sites for sludge from septic tanks located in Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern are the same for the disposal pits and include: volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPHs) as gasoline- and diesel-range organics, polychlorinated biphenyls, Resource Conservation and Recovery Act metals, and radionuclides (including plutonium and depleted uranium). The Battery Dump Site consists of discarded lead-acid batteries and associated construction debris, placing the site in a Housekeeping Category and, consequently, no contaminants are expected to be encountered during the cleanup process. The corrective action the at this CAU will include collection of discarded batteries and construction debris at the Battery Dump Site for proper disposal and recycling, along with photographic documentation as the process progresses. The corrective action for the remaining CASs involves the collection of background radiological data through borings drilled at

  20. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 516: SEPTIC SYSTEMS AND DISCHARGE POINTS, NEVADA TEST SITE, NEVADA

    SciTech Connect

    BECHTEL NEVADA; U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE

    2005-08-01

    Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, is listed in the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 (FFACO, 1996). CAU 516 consists of six Corrective Action Sites (CASs) located in Areas 3, 6, and 22 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada (Figure 1). CAU 516 is comprised of the following six CASs: (1) 03-59-01 Building 3C-36 Septic System; (2) 03-59-02 Building 3C-45 Septic System; (3) 06-51-01 Sump and Piping; (4) 06-51-02 Clay Pipe and Debris; (5) 06-51-03 Clean-Out Box and Piping; and (6) 22-19-04 Vehicle Decontamination Area. Details on site history and site characterization results for CAU 516 are provided in the approved Corrective Action Investigation Plan (CAIP), (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2003), and the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2004).