Science.gov

Sample records for action plan requirements

  1. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  2. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  3. ES H action plan

    SciTech Connect

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  4. Planning as Action Research

    ERIC Educational Resources Information Center

    de Gonzalez, Carmen Beatriz; Hernandez, Teresa; Kusch, Jim; Ryan, Charly

    2004-01-01

    Planning contains so much more than the written plan. Early in 2000, an invitation came from the Collaborative Action Research Network (CARN), to people experienced in action research who might want to help plan and present an action research event for elementary school science teachers in Venezuela, South America, in Autumn 2000. This article…

  5. Planning as Action Research

    ERIC Educational Resources Information Center

    de Gonzalez, Carmen Beatriz; Hernandez, Teresa; Kusch, Jim; Ryan, Charly

    2004-01-01

    Planning contains so much more than the written plan. Early in 2000, an invitation came from the Collaborative Action Research Network (CARN), to people experienced in action research who might want to help plan and present an action research event for elementary school science teachers in Venezuela, South America, in Autumn 2000. This article…

  6. Drinking Water Action Plan

    EPA Pesticide Factsheets

    EPA's Drinking Water Action Plan serves as a national call to action, urging all levels of government, utilities, community organizations, and other stakeholders to work together to increase the safety and reliability of drinking water.

  7. Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues. Supplement 3

    SciTech Connect

    Not Available

    1993-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ``A Prioritization of Generic Safety Issues,`` which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees.

  8. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... proposes to make policy changes to the Action Plan or increase the size of a voluntary program; or HUD requires other changes. The PHA must submit any changes to the Action Plan to HUD for approval. (d) Contents of Plan. The Action Plan shall describe the policies and procedures of the PHA for operation of a...

  9. Benzidine Dyes Action Plan

    EPA Pesticide Factsheets

    This Action Plan addresses the use of benzidine-based dyes and benzidine congener-based dyes, both metalized and non-metalized, in products that would result in consumer exposure, such as for use to color textiles.

  10. Plan of Action.

    ERIC Educational Resources Information Center

    Nelson, Gwen

    This Plan of Action is the seventh in a series of such plans for the development of Cowley County Community College and Area Vocational-Technical School. Part I describes the history and mission of the college, focusing on changes at the college since its establishment in 1922, its location and service area, institutional mission, and educational…

  11. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    In order to develop an affirmative action plan at Triton College, the college President appointed a committee made up of nine representatives from the various college constituencies, the majority of which were women and minorities, to determine the objectives to be achieved and how to implement them, and to establish appropriate review procedures.…

  12. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    In order to develop an affirmative action plan at Triton College, the college President appointed a committee made up of nine representatives from the various college constituencies, the majority of which were women and minorities, to determine the objectives to be achieved and how to implement them, and to establish appropriate review procedures.…

  13. 3RS action plan

    SciTech Connect

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  14. National Action Plan for Energy Efficiency Report

    EPA Pesticide Factsheets

    This seminal report includes the Action Plan recommendations, identifies key barriers, and summarizes methods for energy efficiency in utility ratemaking and revenue requirements, energy resource planning processes, rate design, and other best practices.

  15. Mitigation Action Plan

    SciTech Connect

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  16. Guam Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  17. Texas Solar Collaboration Action Plan

    SciTech Connect

    Winland, Chris

    2013-02-14

    Texas Solar Collaboration Permitting and Interconenction Process Improvement Action Plan. San Antonio-specific; Investigate feasibility of using electronic signatures; Investigate feasibility of enabling other online permitting processes (e.g., commercial); Assess need for future document management and workflow/notification IT improvements; Update Information Bulletin 153 regarding City requirements and processes for PV; Educate contractors and public on CPS Energy’s new 2013 solar program processes; Continue to discuss “downtown grid” interconnection issues and identify potential solutions; Consider renaming Distributed Energy Resources (DER); and Continue to participate in collaborative actions.

  18. Ten Benefits of Participant Action Planning.

    ERIC Educational Resources Information Center

    Youker, Robert B.

    1985-01-01

    Describes the Participant Action Planning Approach (PAPA) process that requires each trainee to prepare a list of concrete actions or changes he or she plans to make back on the job once the training program is over. Benefits of PAPA are discussed, including transfer of learning, verbalization, and commitment. (CT)

  19. What's an Asthma Action Plan?

    MedlinePlus

    ... so that you (as well as your child's teachers, relatives, and caregivers) can respond as needed, even in stressful situations. previous continue Putting the Plan to Good Use Your child's action plan will be most ...

  20. Planning actions in robot automated operations

    NASA Technical Reports Server (NTRS)

    Das, A.

    1988-01-01

    Action planning in robot automated operations requires intelligent task level programming. Invoking intelligence necessiates a typical blackboard based architecture, where, a plan is a vector between the start frame and the goal frame. This vector is composed of partially ordered bases. A partial ordering of bases presents good and bad sides in action planning. Partial ordering demands the use of a temporal data base management system.

  1. Exploiting map plans as resources for action

    NASA Technical Reports Server (NTRS)

    Payton, David

    1989-01-01

    When plans are used as programs for controlling the action of autonomous or teleoperated robots, their abstract representation can easily obscure a great deal of the critical knowledge that originally led to the planned course of action. An autonomous vehicle experiment is highlighted which illustrates how the information barriers created by abstraction can result in undesirable action. It is then shown how the same task can be performed correctly using plans as a resource for action. As a result of this simple change in outlook, problems requiring opportunistic reaction to unexpected changes in the environment can be solved.

  2. Plan of action. Information.

    PubMed

    Leduc, J W

    1996-11-01

    This article provides information on WHO¿s strategic plan of action to aid countries around the world in detecting and controlling emerging infectious diseases. Activities are conducted through an organizational structure that ensures cost-sharing among all the 190 member states of WHO. Four major goals incorporating specific tasks are suggested: 1) the strengthening of global surveillance of infectious diseases through WHO collaborating centers; 2) the rebuilding of the international infrastructure to recognize, report, and respond to emerging and resurgent infectious diseases through laboratory and communication improvement 3) the fostering of applied research through greater practical use of the biotechnological revolution, and 4) the enhancement of the international capacity for infectious disease prevention and control through defined and practical public health steps. To implement this program, a workshop has been conducted and the WHONET program for laboratories has been introduced. In addition, clear guidance will be needed on the question of when to make changes in the antimicrobials recommended for specific diseases. The WHO strategy aims to enhance the capacity of local and national public health laboratories, to foster applied research to address practical problems, and to improve infectious disease prevention and control.

  3. Plan for early action: Recommendations

    SciTech Connect

    1998-12-31

    This report contains recommendations on the implementation of an action plan to reduce or recapture greenhouse gas (GHG) emissions in British Columbia. The report includes the consensus recommendations of the BC Greenhouse Gas Forum, as well as those items on which Forum participants have agreed to disagree, plus the reasons for those differences. The recommendations include: Umbrella actions which may affect several or all sectors of the economy, or support the success of other actions; actions to reduce vehicle kilometers travelled; actions to increase vehicle efficiency or increase the use of alternative fuels or technologies; actions to decrease GHG emissions from energy production; actions to increase end-use energy efficiency; and actions to reduce non-energy-related emissions. Appendices include work sheets on each action, with a description of the action and information on the action`s rationale, experience elsewhere, related policy initiatives, and key issues regarding feasibility and implementation.

  4. The Development of Action Planning in a Joint Action Context

    ERIC Educational Resources Information Center

    Paulus, Markus

    2016-01-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus.…

  5. The Development of Action Planning in a Joint Action Context

    ERIC Educational Resources Information Center

    Paulus, Markus

    2016-01-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus.…

  6. 29 CFR 1910.38 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Means of Egress § 1910.38 Emergency action plans. (a) Application. An employer must have an emergency action plan whenever an OSHA standard in this part requires one. The...

  7. What's an Asthma Action Plan?

    MedlinePlus

    ... the same color system used on peak flow meters. Action plans use symptoms, peak flow readings, or ... which instructions apply to a child's peak flow meter reading. Your child's "personal best" peak flow reading ...

  8. Toluene Diisocyanates (TDI) Action Plan

    EPA Pesticide Factsheets

    This Action Plan addresses the use of toluene diisocyanate (TDI) and related compounds in products that may result in consumer and general population exposures, particularly in or around buildings, including homes and schools.

  9. National Wetlands Mitigation Action Plan

    EPA Pesticide Factsheets

    On December 26, 2002, EPA and the Corps of Engineers announced the release of a comprehensive, interagency National Wetlands Mitigation Action Plan to further achievement of the goal of no net loss of wetlands.

  10. Action Understanding as Inverse Planning

    ERIC Educational Resources Information Center

    Baker, Chris L.; Saxe, Rebecca; Tenenbaum, Joshua B.

    2009-01-01

    Humans are adept at inferring the mental states underlying other agents' actions, such as goals, beliefs, desires, emotions and other thoughts. We propose a computational framework based on Bayesian inverse planning for modeling human action understanding. The framework represents an intuitive theory of intentional agents' behavior based on the…

  11. Action Understanding as Inverse Planning

    ERIC Educational Resources Information Center

    Baker, Chris L.; Saxe, Rebecca; Tenenbaum, Joshua B.

    2009-01-01

    Humans are adept at inferring the mental states underlying other agents' actions, such as goals, beliefs, desires, emotions and other thoughts. We propose a computational framework based on Bayesian inverse planning for modeling human action understanding. The framework represents an intuitive theory of intentional agents' behavior based on the…

  12. American Samoa: Energy Action Plan

    SciTech Connect

    Ness, J. Erik; Haase, Scott; Conrad, Misty

    2016-09-01

    This document outlines actions being taken to reduce American Samoa's petroleum consumption. It describes the four near-term strategies selected by the American Samoa Renewable Energy Committee during action-planning workshops conducted in May 2016, and describes the steps that will need to be taken to implement those strategies.

  13. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh.

    This affirmative action (AA) guide is intended to identify and remove discriminatory employment practices that may still exist in the North Carolina State Department of Public Instruction (DPI). DPI extends equal employment opportunity (EEO) to all applicants and employees without regard to race, color, religion, sex, age, handicap, political…

  14. National Security Technology Incubator Action Plan

    SciTech Connect

    None, None

    2008-02-28

    This report documents the action plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). This action plan serves as a tool in measuring progress in the development process and delivery of services for the NSTI program. Continuous review and evaluation of the action plan is necessary in the development process of the NSTI. The action plan includes detailed steps in developing the NSTI program based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Included are tasks required to implement the NSTI, developed within a work breakdown structure. In addition, a timeline is identified for each task.

  15. American Samoa Energy Action Plan

    SciTech Connect

    Haase, Scott; Esterly, Sean; Herdrich, David; Bodell, Tim; Visser, Charles

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  16. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  17. The development of action planning in a joint action context.

    PubMed

    Paulus, Markus

    2016-07-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus. Their task was to hand the experimenter a tool with which she could activate 1 of 2 different effects on the apparatus. The elicitation of each effect required participants to grasp and insert the tool in a particular orientation. We assessed whether participants planned their grasping and reaching action in such a way that it enabled the partner to efficiently handle the tool, that is, anticipating the final end state of the joint activity. We found that 3-year-old children did not adjust their behavior to accommodate the other's action and that they did not increase their performance over multiple trials. Five- and 7-year-old children initially showed a tendency to plan their action in an egocentric manner (i.e., showed a form of egocentrism), but improved their joint action performance over time. Adult participants demonstrated joint action planning from the beginning. Interestingly, 3- and 5-year-old children were able to plan their grasp efficiently when acting alone on the apparatus. Yet, having first-hand experience with the task before acting with a partner did not facilitate performance in the joint action task for younger children. Overall, the study informs current approaches on the psychological basis and ontogenetic origins of joint action in childhood. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  18. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 543: LIQUID DISPOSAL UNITS, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2006-09-01

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved Corrective Action Decision Document.

  19. National Biofuels Action Plan

    DTIC Science & Technology

    2008-10-01

    production targets are too costly to compete effectively in the marketplace . Because the pace of technological breakthroughs required to lower costs is... marketplace . Transformational breakthroughs in basic and applied science will be necessary to make plant fi ber-based biofuels economically viable. For...enable us to re-engineer plants, enzymes , and microbes to over- come recalcitrance. Another key barrier is to understand how plant material breaks

  20. ICDF Complex Remedial Action Work Plan

    SciTech Connect

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  1. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.320 Section 91.320... Consolidated Plan § 91.320 Action plan. The action plan must include the following: (a) Standard Form 424; (b) A concise executive summary that includes the objectives and outcomes identified in the plan as...

  2. One School's Positive Action Plan.

    ERIC Educational Resources Information Center

    McCormack, Sammie

    Because they felt that students can be responsible for their own behavior, the staff of Jefferson Elementary School, serving 300 students in grades 1 through 4 in a small rural community, developed a program which promoted self-management. In September 1979, teachers participated in an assertive discipline workshop. A Positive Action Plan evolved,…

  3. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... complies with the requirements of this section before the PHA implements an FSS program, whether the FSS... cause, a PHA that is establishing its first FSS program must submit an Action Plan to HUD for approval... incentive award units; or (B) Approval of other funding that establishes the obligation to operate an FSS...

  4. Hungarian climate change action plan

    SciTech Connect

    Molnar, S.; Takacs, T.; Arpasi, M.; Farago, T.; Palvoelgyi, T.; Harnos, Z.; Lontay, Z.; Somogyi, Z.; Tajthy, T.

    1998-12-31

    In 1994--1996, within the framework of the US Country Studies Program, the Hungarian Country Study Team developed the national greenhouse gas emission inventory, and elaborated the mitigation options for the different sectors of the economy. In 1997, the development of a National Action Plan was begun as the continuation of this work. Results of the inventory study showed that greenhouse gas emissions decreased from the selected base level (i.e., from the yearly average emissions of 1985--1987) until 1994 by cca. 25%. However, this decrease was primarily caused by the deep economic recession. Therefore the policy makers have to face the problem of economic recovery without a relevant increase of greenhouse gas emissions in the near future. This is the main focus of the mitigation analysis and the National Action Plan.

  5. Developing a Global Green Freight Action Plan

    EPA Pesticide Factsheets

    This Climate and Clean Air Coalition (CCAC) presentation gives an overview of the Global Green Freight Action Plan to improve the energy efficiency and environmental performance of freight operations worldwide along with developing an action plan.

  6. Final Federal Radon Action Plan Scorecard

    EPA Pesticide Factsheets

    This page provides information and a link to the draft Federal Radon Action Plan. It also contains a Federal Radon Action Plan Scorecard, a tool designed to display the current status of each federal agency commitments and outcomes to date.

  7. Corrective Action Planning for Environmental Compliance Deficiencies

    SciTech Connect

    Sigmon, C. F.; Ashburn, S. A.; Jolley, R. L.; Smith, A. A.; Mercer, A. E.; Oeulette, B.; Renz, K.; Scott, S.

    1995-01-01

    Effective corrective action planning is one of the cornerstones of an effective environmental management program. Alternatively, ineffective planning can highlight an installation`s unwillingness or inability to effectively address environmental compliance deficiencies. The following paper discusses several guidelines to consider in corrective action planning to ensure that plans benefit rather than harm an installation`s overall environmental management program.

  8. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Consortia; Contents of Consolidated Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a Standard Form 424 for the consortium for the HOME program. Each entitlement jurisdiction also must submit...

  9. Require a PLAN Act

    THOMAS, 113th Congress

    Rep. Price, Tom [R-GA-6

    2013-02-01

    Senate - 02/07/2013 Received in the Senate and Read twice and referred to the Committee on the Budget. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  10. 12 CFR 704.10 - Investment action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 7 2014-01-01 2014-01-01 false Investment action plan. 704.10 Section 704.10... CREDIT UNIONS § 704.10 Investment action plan. (a) Any corporate credit union in possession of an investment, including a derivative, that fails to meet a requirement of this part must, within 30 calendar...

  11. 12 CFR 704.10 - Investment action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 7 2013-01-01 2013-01-01 false Investment action plan. 704.10 Section 704.10... CREDIT UNIONS § 704.10 Investment action plan. (a) Any corporate credit union in possession of an investment, including a derivative, that fails to meet a requirement of this part must, within 30 calendar...

  12. 12 CFR 704.10 - Investment action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Investment action plan. 704.10 Section 704.10... CREDIT UNIONS § 704.10 Investment action plan. (a) Any corporate credit union in possession of an investment, including a derivative, that fails to meet a requirement of this part must, within 30 calendar...

  13. Ten-year urban forestry action plan

    Treesearch

    J.W." Jerry" Van Sambeek

    2017-01-01

    The Ten-year Urban Forestry Action Plan: 2016-2026 was published in September, 2015 (see http://www.urbanforestry.subr.edu/FinalActionPlan_Complete_11_17_15.pdf). This 260 page heavily illustrated document was prepared by the National Urban and Community Forestry Advisory Council (NUCFAC) under leadership and funding from the USDA Forest Service. The Plan's...

  14. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... responding to contaminated soil and ground water. In either case, owners and operators are responsible for... additional information or to develop and submit a corrective action plan for responding to contaminated soils and ground water. If a plan is required, owners and operators must submit the plan according to a...

  15. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  16. K basins interim remedial action health and safety plan

    SciTech Connect

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  17. Clean Slate 1 Corrective Action Plan, Revision 0

    SciTech Connect

    1997-04-01

    This Corrective Action Plan (CAP) has been prepared to meet the requirements specified in the Federal Facility Agreement and Consent Order (FFACO, 1996). A Corrective Action Decision Document (CADD) (DOE, 1997) was submitted to the Nevada Department of Environmental Protection (NDEP) January 31, 1997 for the Clean Slate 1 (CS-1) Site in accordance with the Corrective Action Investigation Plan (CAIP) (DOE, 1996) and the Soils Media Operable Unit Quality Assurance Project Plan (DOE, 1995). The FFACO lists CS-1 as Corrective Action Unit (CAU) number 412.

  18. Learning through Participatory Action Research for Community Ecotourism Planning.

    ERIC Educational Resources Information Center

    Guevara, Jose Roberto Q.

    1996-01-01

    Ecologically sound tourism planning and policy require an empowering community participation. The participatory action research model helps a community gain understanding of its social reality, learn how to learn, initiate dialog, and discover new possibilities for addressing its situation. (SK)

  19. Learning through Participatory Action Research for Community Ecotourism Planning.

    ERIC Educational Resources Information Center

    Guevara, Jose Roberto Q.

    1996-01-01

    Ecologically sound tourism planning and policy require an empowering community participation. The participatory action research model helps a community gain understanding of its social reality, learn how to learn, initiate dialog, and discover new possibilities for addressing its situation. (SK)

  20. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the Assessment is to provide background and justification for an Action Plan. The Action Plan, which.... Goals will clearly relate to the needs and issues identified in the Assessment and must be projected for... or unique structures, landscapes, or similar features in parks of historical or architectural...

  1. Multidisciplinary team interaction: summary and Action Plan.

    PubMed

    Brink, B; Bugslag, R; González Del Castillo, B; Hastings, P; Kipor, G V; Lee, S W; Lo, C B; Poles, L; Robinson, P; Ronquillo, E L; Staña, J; Sydor, J; Thani, H

    2001-01-01

    Multidisciplinary team interaction has become a commonplace phrase in the discussion of disaster response. Theme 6 explored multidisciplinary team interactions and attempted to identify some of the key issues and possible solutions to the seemingly intractable problems inherent in this endeavour. Details of the methods used are provided in the introductory paper. The Cochairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. The Cochairs then presided over a workshop that resulted in the generation of a set of Action Plans that then were reported to the collective group of all delegates. Main points developed during the presentations and discussion included: (1) promotion of multidisciplinary collaboration, (2) standardization, (3) the Incident Command System, (4) professionalism, (5) regional disparities, and (6) psychosocial impact. Action plans recommended: (1) a standardized template for Needs Assessment be developed, implemented, and applied using collaboration with international organizations, focusing on needs and criteria appropriate to each type of event, and (2) team needs assessments be recognized for local responses and for determination of when international assistance may be required, for planning a command system, and for evaluating the psychosocial impact. There is a clear need for the development of standardized methods for the assessment of needs, development and implementation of a command structure, and for appreciation of regional differences and the psychosocial impact of all interventions.

  2. Quality-Planning-Requirements Documents

    NASA Technical Reports Server (NTRS)

    Leonard, P. A.; Flores, A.

    1983-01-01

    Report outlines planning procedures used in establishing inspection and quality assurance activities required of contractors constructing and testing Space Shuttle and ground-support equipment. Report useful to contractors establishing inspection points in commercial manufacturing operations.

  3. The role of action control and action planning on fruit and vegetable consumption.

    PubMed

    Zhou, Guangyu; Gan, Yiqun; Miao, Miao; Hamilton, Kyra; Knoll, Nina; Schwarzer, Ralf

    2015-08-01

    Globally, fruit and vegetable intake is lower than recommended despite being an important component to a healthy diet. Adopting or maintaining a sufficient amount of fruit and vegetables in one's diet may require not only motivation but also self-regulatory processes. Action control and action planning are two key volitional determinants that have been identified in the literature; however, it is not fully understood how these two factors operate between intention and behavior. Thus, the aim of the current study was to explore the roles of action control and action planning as mediators between intentions and dietary behavior. A longitudinal study with three points in time was conducted. Participants (N = 286) were undergraduate students and invited to participate in a health behavior survey. At baseline (Time 1), measures of intention and fruit and vegetable intake were assessed. Two weeks later (Time 2), action control and action planning were assessed as putative sequential mediators. At Time 3 (two weeks after Time 2), fruit and vegetable consumption was measured as the outcome. The results revealed action control and action planning to sequentially mediate between intention and subsequent fruit and vegetable intake, controlling for baseline behavior. Both self-regulatory constructs, action control and action planning, make a difference when moving from motivation to action. Our preliminary evidence, therefore, suggests that planning may be more proximal to fruit and vegetable intake than action control. Further research, however, needs to be undertaken to substantiate this conclusion.

  4. Hazardous Waste Remedial Actions Program: Remedial Actions Planning Program Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1989-04-01

    The purpose of this Plan is to describe the quality assurance (QA) requirements for the RAP Program by identifying the quality elements to be controlled and specifying how they will be controlled. The activities for which control elements will be identified include those relating to: preparation, review, and approval of plans, reports, and studies; execution of field and analytical work by subcontractors and other agents; control of subcontractors and other agents during other phases of work; and actions internal to the RAP Program to ensure proper execution of projects.

  5. Semantic Activation in Action Planning

    ERIC Educational Resources Information Center

    Lindemann, Oliver; Stenneken, Prisca; van Schie, Hein T.; Bekkering, Harold

    2006-01-01

    Four experiments investigated activation of semantic information in action preparation. Participants either prepared to grasp and use an object (e.g., to drink from a cup) or to lift a finger in association with the object's position following a go/no-go lexical-decision task. Word stimuli were consistent to the action goals of the object use…

  6. 32 CFR 651.33 - Actions normally requiring an EA.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... cause significant increase in soil erosion, or affect prime or unique farmland (off Army property... decisions, in principle) for future actions with potential environmental effects. Such actions should be... NEPA analysis may be required. (g) Development and approval of installation master plans. (h...

  7. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or... action plans. (a) Scope and application. This section requires all employers to develop and implement an... employees must take to ensure employee safety from fire and other emergencies. 14 When an employer...

  8. Action Plan for updated Chapter 15 Accident Analysis in the SRS Production Reactor SAR

    SciTech Connect

    Hightower, N.T. III; Burnett, T.W.

    1989-11-15

    This report describes the Action Plan for the upgrade of the Chapter 15 Accident Analysis in the SRS Production Reactor SAR required for K-Restart. This Action Plan will be updated periodically to reflect task accomplishments and issue resolutions.

  9. The Climate Change Action Plan: Technical supplement

    SciTech Connect

    Not Available

    1994-03-01

    This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

  10. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  11. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  12. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  13. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  14. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  15. Gathering Strength: Canada's Aboriginal Action Plan.

    ERIC Educational Resources Information Center

    Department of Indian Affairs and Northern Development, Ottawa (Ontario).

    Designed to renew the relationship between the Canadian government and the Aboriginal peoples of Canada, this action plan contains a statement of reconciliation, a statement of renewal, and four key objectives for action. First, renewing partnerships includes community-based healing to address the negative effects of the residential schools…

  16. World Plan of Action: Decade for Women.

    ERIC Educational Resources Information Center

    Women's Equity Action League, Washington, DC.

    The World Plan of Action adopted by the United Nations World Conference of the International Women's Year in Mexico City in July 1975 is presented in condensed form. The major purpose is to provide guidelines for national action over the ten-year period 1975-1985 as part of a sustained, long-term effort to achieve the objectives of International…

  17. 48 CFR 806.570 - Planning requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Planning requirements. 806... AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Competition Advocates 806.570 Planning requirements... planning that is required. (3) A description of how to integrate the Competition Plan into...

  18. Put your development plan into action.

    PubMed

    Day-Calder, Mandy

    2017-04-05

    Having completed your appraisal, you will have a plan for the year ahead. Hopefully you have learned from your appraisal discussion and feel motivated. But to have a successful year ahead and grow as a nursing professional, you will need to turn your personal development plan (PDP) into action. Here we look at ways you can do so without feeling overwhelmed.

  19. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... in its strategic plan; (C) Surplus from urban renewal settlements; (D) Grant funds returned to the... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Action plan. 91.220 Section 91.220 Housing and Urban Development Office of the Secretary, Department of Housing and Urban...

  20. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... in its strategic plan; (C) Surplus from urban renewal settlements; (D) Grant funds returned to the... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Action plan. 91.220 Section 91.220 Housing and Urban Development Office of the Secretary, Department of Housing and Urban...

  1. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... in its strategic plan; (C) Surplus from urban renewal settlements; (D) Grant funds returned to the... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Action plan. 91.220 Section 91.220 Housing and Urban Development Office of the Secretary, Department of Housing and Urban...

  2. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... in its strategic plan; (C) Surplus from urban renewal settlements; (D) Grant funds returned to the... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.220 Section 91.220 Housing and Urban Development Office of the Secretary, Department of Housing and Urban...

  3. Action Planning and Recording Achievement.

    ERIC Educational Resources Information Center

    Green, Muriel

    This document examines strategies and procedures that British further education (FE) colleges can use to develop and enhance systems and structures for guiding and supporting learners and learning. It is based on the findings of a field test of the Managing Learning model for planning and recording the process of FE students. First, the importance…

  4. Affirmative Action Plan. Fourth Edition.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    The aim of this plan is to provide the reader with an outline of the New York State Education Department's commitment to equal employment opportunity and its obligation to comply with various anti-discrimination laws. These laws include the New York State Human Rights Law, the Federal Equal Employment Opportunity Act of 1972, Section 504 of the…

  5. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    SciTech Connect

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  6. National Action Plan for Energy Efficiency Report

    SciTech Connect

    National Action Plan for Energy Efficiency

    2006-07-01

    Summarizes recommendations, key barriers, and methods for energy efficiency in utility ratemaking as well as revenue requirements, resource planning processes, rate design, and program best practices.

  7. Putting Action Back into Action Planning: Experiences of Career Clients

    ERIC Educational Resources Information Center

    Borgen, William A.; Maglio, Asa-Sophia T.

    2007-01-01

    This study used the critical incident technique to investigate what helped and hindered unemployed and career-changing people in implementing the action plans they developed while participating in career or employment counseling. Information from interviews with 23 women and 16 men generated 9 categories of helping incidents and 9 categories of…

  8. What contributes to action plan enactment? Examining characteristics of physical activity plans.

    PubMed

    Fleig, Lena; Gardner, Benjamin; Keller, Jan; Lippke, Sonia; Pomp, Sarah; Wiedemann, Amelie U

    2017-08-18

    Individuals with chronic conditions can benefit from formulating action plans to engage in regular physical activity. However, the content and the successful translation of plans into action, so-called plan enactment, are rarely adequately evaluated. The aim of this study was to describe the content of user-specified plans and to examine whether participants were more likely to enact their plans if these plans were highly specific, viable, and instrumental. The study presents secondary analyses from a larger behavioural intervention in cardiac and orthopaedic rehabilitation. The content of 619 action plans from 229 participants was evaluated by two independent raters (i.e., qualitative analyses and ratings of specificity) and by participants themselves (i.e., instrumentality and viability). Plan enactment was also measured via self-reports. Multilevel analyses examined the relationship between these plan characteristics and subsequent plan enactment, and between plan enactment and aggregated physical activity. Participants preferred to plan leisure-time physical activities anchored around time-based cues. Specificity of occasion cues (i.e., when to act) and highly instrumental plans were positively associated with plan enactment. Interestingly, individuals who planned less specific behavioural responses (i.e., what to do) were more likely to enact their plans. Plan enactment was positively associated with aggregated behaviour. Interventions should not only emphasize the importance of planning, but also the benefits of formulating specific contextual cues. Planning of the behavioural response seems to require less precision. Allowing for some flexibility in executing the anticipated target behaviour seems to aid successful plan enactment. Statement of Contribution What is already known on this subject? Action planning interventions are efficacious in promoting health behaviour. Characteristics of plan content (i.e., specificity) matter for unconditional behaviour

  9. Electronic asthma action plan database: asthma action plan development using Microsoft Access.

    PubMed

    Mangold, Rita A; Salzman, Gary A

    2005-04-01

    We created a user-friendly database for use with asthma management consistent with the national guidelines for asthma. A database was designed by using Microsoft Access for the creation of asthma action plans that can be shared between providers caring for patients with asthma. This database and the use of "form entry" improved documentation of asthma action plans, which are increasingly being used to assess appropriateness of care. We currently have 400 asthma action plans in the database. These action plans can be queried to document compliance with accepted best practices. Asthma action plans can be created and stored in an Access database that is both user-friendly and that can be networked to provide more consistent asthma care.

  10. Final Action Plan to Tiger Team

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  11. 7 CFR 275.16 - Corrective action planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which:...

  12. 45 CFR 95.507 - Plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Plan requirements. 95.507 Section 95.507 Public... Allocation Plans § 95.507 Plan requirements. (a) The State shall submit a cost allocation plan for the State... Regional Office. The plan shall: (1) Describe the procedures used to identify, measure, and allocate...

  13. 45 CFR 95.507 - Plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Plan requirements. 95.507 Section 95.507 Public... Allocation Plans § 95.507 Plan requirements. (a) The State shall submit a cost allocation plan for the State... Regional Office. The plan shall: (1) Describe the procedures used to identify, measure, and allocate...

  14. 29 CFR 1910.38 - Emergency action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action plans. (a) Application. An employer must have an emergency action plan whenever an OSHA standard in this...

  15. 29 CFR 1910.38 - Emergency action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action plans. (a) Application. An employer must have an emergency action plan whenever an OSHA standard in this...

  16. 29 CFR 1910.38 - Emergency action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action plans. (a) Application. An employer must have an emergency action plan whenever an OSHA standard in this...

  17. Action plan for the Tiger Team assessment report

    SciTech Connect

    Not Available

    1990-08-30

    This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

  18. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park...

  19. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park...

  20. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park...

  1. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park...

  2. Chemical Safety for Sustainability: Research Action Plan

    EPA Pesticide Factsheets

    The Strategic Research Action Plan for EPA’s Chemical Safety for Sustainability research program presents the purpose, design and themes of the Agency’s research efforts to ensure safety in the design, manufacture and use of existing and future chemicals.

  3. Emergency Action Plans in Physical Education

    ERIC Educational Resources Information Center

    Tanis, Cindy J.; Hebel, Susan L.

    2016-01-01

    Emergency Action Plans (EAP) are essential to properly manage injuries and illnesses in physical education and sport. However, most literature discusses EAP's in the athletic arena instead of physical education. The purpose of this study was to examine physical education instructors' experiences of student illness and injury, discuss the steps of…

  4. Emergency Action Plans in Physical Education

    ERIC Educational Resources Information Center

    Tanis, Cindy J.; Hebel, Susan L.

    2016-01-01

    Emergency Action Plans (EAP) are essential to properly manage injuries and illnesses in physical education and sport. However, most literature discusses EAP's in the athletic arena instead of physical education. The purpose of this study was to examine physical education instructors' experiences of student illness and injury, discuss the steps of…

  5. Triton College Faculty Recruitment Action Plan (FRAP).

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    Triton College's (Illinois) Faculty Recruitment Action Plan (FRAP) provides a detailed guide to hiring new faculty, focusing on the desired characteristics of new faculty; marketing and recruitment strategies; employment incentives; the application, interviewing, and selection process; new faculty orientation; a timeline for implementation; cost…

  6. Action Plan for Florida's Public Libraries. Addendum.

    ERIC Educational Resources Information Center

    Florida Library Study Commission, Tallahassee.

    The introduction to this addendum (the Action Plan is LI 004 521) discusses the present use by libraries of information-handling technology and identifies some of the trends taking place in performing essential library services. While some limited inroads have been made in automating certain public library functions, the bulk of services is still…

  7. Housekeeping category corrective action unit work plan

    SciTech Connect

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  8. Nutrition Integrity in Action: Planning for Success.

    ERIC Educational Resources Information Center

    Stevenson, Peggy

    1994-01-01

    The Antioch Unified School District is one of several California schools testing a version of the Nutrient Standard Menu Planning (NSMP) to meet the new rules that require all schools to reduce the fat content of meals. NSMP, presently implemented at the elementary level, has increased flexibility in menu planning and led to better management and…

  9. Improving Contract Performance by Corrective Actions Plans

    SciTech Connect

    Dowd, A.S., jr.

    2002-06-23

    Corrective Action Plans (CAPs) are required to be developed, submitted, and reported upon by the prime contractors for the U.S. Department of Energy (U.S. DOE) Management and Operations (M and O) contracts. The best known CAP ''type,'' and there are many, is for Price-Anderson Amendments Act (PAAA) ''potential noncompliances.'' The M and O contractor fines for PAAA problems have increased from approximately $100,000 in 1996 to almost $2,000,000 in 2000. In order to improve CAP performance at the National Nuclear Security Administration (NNSA) site at Y-12 in Oak Ridge, Tennessee, the contractor chose to centralize the company-wide processes of problem identification and reporting with the PAAA (and other) CAP processes. This directly integrates these functional reports to the contractor General Manager. The functions contained in the M and O contractor central organization, called ''Performance Assurance,'' are: PAAA; Defense Nuclear Facilities Safety Board (DNFSB) Liaison; Contract Requirements Management; Issues Management (including the CAP processes); Lessons Learned; Independent and Management Assessments; Internal Audits; and Ethics. By centrally locating and managing these problem identification and problem correction functions, the contractor, BWXT Y-12, L.L.C., has improved PAAA (and other) CAP performance more than 200 percent in the first year of the contract. Much of this improvement (see Table 1 for examples) has been achieved by increasing the knowledge and experience of management and workers in the specific contract and company requirements for CAPs. The remainder of this paper will describe some of the many CAP processes at Y-12 to show the reader the non-trivial scope of the CAP process. Improvements in CAP management will be discussed. In addition, a specific recommendation for CAP management, in a major capital construction project, will be presented.

  10. 78 FR 67027 - Nontank Vessel Response Plans and Other Response Plan Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... SECURITY Coast Guard 33 CFR Part 151, 155 and 160 RIN 1625-AB27 Nontank Vessel Response Plans and Other Response Plan Requirements AGENCY: Coast Guard, DHS. ACTION: Rule; information collection approval. SUMMARY: On September 30, 2013, the Coast Guard amended regulations on response plans for nontank vessels. The...

  11. Awarding Educational Credit for CETA Training: A Plan of Action.

    ERIC Educational Resources Information Center

    Sullins, W. Robert; And Others

    A project was conducted to determine problems or barriers prohibiting awarding credit for Comprehensive Employment and Training Act (CETA) training in Virginia. Potential solutions and strategies for their implementation were to be identified. A variety of methods were used to obtain information required to produce a Plan of Action that presents…

  12. Action Plan for the Development of Civic Morality

    ERIC Educational Resources Information Center

    Chinese Education and Society, 2006

    2006-01-01

    This paper discusses the action plan for the development of civic morality. Here, the importance, substance, ideology and policy principles guiding the development of civic morality is elaborated. In order to strengthen the development of civic morality, it is a must to adapt to the requirements of the developing situation; seize good…

  13. Looking at the formulation of national biosecurity education action plans.

    PubMed

    Sture, J; Minehata, M; Shinomiya, N

    2012-01-01

    In order for states to be assured of their compliance with the requirements of the Biological and Toxin Weapons Convention, it is necessary that all those science and policy stakeholders working within that state should be aware of their responsibilities under the Convention. This can only be achieved through a comprehensive national biosecurity education programme. We propose that each state should produce a national biosecurity action plan, with accompanying resources and materials to achieve this. A number of resources are already available online to support states in this challenge. We present a model for a national biosecurity action plan and propose a number of ways in which this may be achieved.

  14. Compliance of Australian threatened species recovery plans with legislative requirements.

    PubMed

    Ortega-Argueta, Alejandro; Baxter, Greg; Hockings, Marc

    2011-08-01

    Recovery plans are the main documents supporting management decision-making for threatened species. We evaluated Australian recovery plans to assess their appropriateness as conservation and management planning instruments. Six legislative requirements (species information and general requirements, species distribution and location, known and potential threats, objectives, performance criteria and actions, duration of the plan, and estimated costs of plan implementation) were used to assess the degree of compliance of recovery plans with the relevant legislation. We assessed all 236 official recovery plans which had been adopted as at January 2006. The results showed that plans were most compliant regarding the setting of objectives, performance criteria, recovery actions, and duration of plan. Most plans included a single performance criterion that was generally related to the population status of target species. Improvement is required in relation to identification of current threats and critical habitats, and the establishment of basic elements of monitoring and evaluation for measuring recovery progress. Gaps in ecological information are the main factors affecting adequate compliance with legislative requirements as opposed to managerial information (e.g. clarity in establishing the implementation schedule, costs and resource allocation). Planning deficiencies could be addressed by improving the recovery planning guidelines and more carefully reviewing the drafting and adoption of new plans.

  15. Written action plans for asthma: an evidence-based review of the key components

    PubMed Central

    Gibson, P; Powell, H

    2004-01-01

    Background: Written action plans for asthma facilitate the early detection and treatment of an asthma exacerbation. Several versions of action plans have been published but the key components have not been determined. A study was undertaken to determine the impact of individual components of written action plans on asthma health outcomes. Methods: Randomised controlled trials (n = 26) that evaluated asthma action plans as part of asthma self-management education were identified. Action plans were classified as being individualised and complete if they specified when and how to increase treatment (n = 17), and as incomplete (n = 4) or non-specific (n = 5) if they did not include these instructions. Results: For individualised complete written action plans the use of 2–4 action points and the use of both inhaled (ICS) and oral (OCS) corticosteroid consistently improved asthma outcomes. Action points based on personal best peak expiratory flow (PEF) consistently improved health outcomes while those based on percentage predicted PEF did not. The efficacy of incomplete action plans was inconclusive because of insufficient data. Non-specific action plans led to improvements in knowledge and symptoms. Conclusion: Individualised written action plans based on personal best PEF, using 2–4 action points, and recommending both ICS and OCS for treatment of exacerbations consistently improve asthma health outcomes. Other variations appear less beneficial or require further study. These observations provide a guide to the types of variations possible with written action plans, and strongly support the use of individualised complete written action plans. PMID:14760143

  16. 46 CFR 169.305 - Plans required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Plans required. 169.305 Section 169.305 Shipping COAST... and Arrangement Plans § 169.305 Plans required. (a) Except as provided in paragraphs (b) and (c) of... vessel is to be inspected, at least one copy of each of the following plans: (1) Midship section....

  17. 76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... INFORMATION CONTACT: Rachel Wolf, Centers for Disease Control and Prevention, National Center for Emerging and... problem of AR. This document, entitled A Public Health Action Plan to Combat Antimicrobial Resistance...

  18. 76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    .... Comments may also be viewed at http://www.regulations.gov . FOR FURTHER INFORMATION CONTACT: Rachel Wolf... Plan, outlining specific issues, goals, and actions important for addressing the problem of AR. This...

  19. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 536: AREA 3 RELEASE SITE, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2005-09-01

    CAU 536 consists of CAS 03-44-02, Steam Jenny Discharge, located in Area 3 of the NTS. The site was characterized in 2004 according to the approved CAIP and the site characterization results are reported in the CAU 536 CADD. The purpose of this Corrective Action Plan (CAP) is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 536 CADD.

  20. Action plans can interact to hinder or facilitate reach performance.

    PubMed

    Fournier, Lisa R; Wiediger, Matthew D; Taddese, Ezana F

    2015-11-01

    Executing a reach action can be delayed while retaining another action in working memory (WM) if the two action plans partly overlap rather than do not overlap. This delay (partial repetition cost) occurs when reach responses are under cognitive control. In this study, we investigated whether facilitation (a partial repetition benefit) occurs when reach responses are automatic. We also examined whether the hemisphere controlling the limb or selection of the preferred limb (based on a free-reach task) influences reach performance when the actions partly overlap. Left- and right-handers reached to different stimulus locations to the left and right of body midline with their ipsilateral hand while maintaining an action plan in WM that required the same or the different hand. The results showed a partial repetition benefit for spatially compatible reaches to left and right stimulus locations far from the body midline, but not for those near the body midline. Also, no partial repetition cost was found at any of the stimulus-reach locations. This indicates that automatic reach responses that partly overlap with an action plan maintained in WM are not delayed, but instead can be facilitated (partial repetition benefit). The roles of hemisphere and reach-hand preference in action control and the importance of the degree of feature overlap in obtaining a partial repetition benefit (and cost) are discussed.

  1. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  2. Remedial Action Plan for Fort Douglas

    DTIC Science & Technology

    1994-03-01

    of the Comprehensive Environmental Response, This Remedial Action Plan (RAP), issued by the U.S. Compensation, and Liability Act ( CERCLA ), also Army...Army), identifies the preferred alternatives for known as Superfund , and the National Environmental cleaning up electrical utility transformers and...transferred to the University of have generally followed guidance established in Utah. This transferred property is known as the CERCLA . The purpose of

  3. Fraser River action plan: Forest industries

    SciTech Connect

    1998-12-31

    This research reviews the activities conducted under the Fraser River Action Plan with regard to forest industries and their effects on the Fraser River Basin environment. The review covers the following topics: Projects to cut pollution from wood preservatives and pulp/paper mills; ecological effects of pulp mill effluents; wood waste and its utilization; habitat conservation; environmentally sound forestry practices; riparian conservation; habitat and ecosystem protection; and the use of economic instruments as an alternative to regulation.

  4. National Biofuels Action Plan, October 2008

    SciTech Connect

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  5. India's National Action Plan on Climate Change

    PubMed Central

    Pandve, Harshal T.

    2009-01-01

    Climate change is one of the most critical global challenges of our times. Recent events have emphatically demonstrated our growing vulnerability to climate change. Climate change impacts will range from affecting agriculture – further endangering food security – to sea-level rise and the accelerated erosion of coastal zones, increasing intensity of natural disasters, species extinction, and the spread of vector-borne diseases. India released its much-awaited National Action Plan on Climate Change (NAPCC) to mitigate and adapt to climate change on June 30, 2008, almost a year after it was announced. The NAPCC runs through 2017 and directs ministries to submit detailed implementation plans to the Prime Minister's Council on Climate Change by December 2008. This article briefly reviews the plan and opinion about it from different experts and organizations. PMID:20165607

  6. India's National Action Plan on Climate Change.

    PubMed

    Pandve, Harshal T

    2009-04-01

    Climate change is one of the most critical global challenges of our times. Recent events have emphatically demonstrated our growing vulnerability to climate change. Climate change impacts will range from affecting agriculture - further endangering food security - to sea-level rise and the accelerated erosion of coastal zones, increasing intensity of natural disasters, species extinction, and the spread of vector-borne diseases. India released its much-awaited National Action Plan on Climate Change (NAPCC) to mitigate and adapt to climate change on June 30, 2008, almost a year after it was announced. The NAPCC runs through 2017 and directs ministries to submit detailed implementation plans to the Prime Minister's Council on Climate Change by December 2008. This article briefly reviews the plan and opinion about it from different experts and organizations.

  7. 24 CFR 248.217 - Revisions to plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AUTHORITIES PREPAYMENT OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income Preservation Act of 1987 § 248.217 Revisions to plan of action. The owner may from time to...

  8. Evaluation criteria for communications-related corrective action plans

    SciTech Connect

    1997-02-01

    This document provides guidance and criteria for US Nuclear Regulatory Commission (NRC) personnel to use in evaluating corrective action plans for nuclear power plant communications. The document begins by describing the purpose, scope, and applicability of the evaluation criteria. Next, it presents background information concerning the communication process, root causes of communication errors, and development and implementation of corrective actions. The document then defines specific criteria for evaluating the effectiveness of the corrective action plan, interview protocols, and an observation protocol related to communication processes. This document is intended only as guidance. It is not intended to have the effect of a regulation, and it does not establish any binding requirements or interpretations of NRC regulations.

  9. 48 CFR 323.7002 - Actions required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 323.7002 Actions required. (a) Contracting activities. The Contracting Officer shall insert the clause in 352.223-70, Safety and Health, or a clause substantially the same, in...

  10. 48 CFR 323.7002 - Actions required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 323.7002 Actions required. (a) Contracting activities. The Contracting Officer shall insert the clause in 352.223-70, Safety and Health, or a clause substantially the same, in...

  11. 48 CFR 323.7002 - Actions required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 323.7002 Actions required. (a) Contracting activities. The Contracting Officer shall insert the clause in 352.223-70, Safety and Health, or a clause substantially the same, in...

  12. 48 CFR 323.7002 - Actions required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 323.7002 Actions required. (a) Contracting activities. The Contracting Officer shall insert the clause in 352.223-70, Safety and Health, or a clause substantially the same, in...

  13. 48 CFR 323.7002 - Actions required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 323.7002 Actions required. (a) Contracting activities. The Contracting Officer shall insert the clause in 352.223-70, Safety and Health, or a clause substantially the same, in...

  14. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits that...

  15. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits that...

  16. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits that...

  17. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits that...

  18. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits that...

  19. 24 CFR 761.21 - Plan requirement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... intervention, drug treatment, tenant patrols, and physical improvements. The plan under this section serves as... requirements of this section before grant funds are distributed. HUD will review the submitted plans for a...

  20. 43 CFR 3482.2 - Action on plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Exploration and Resource Recovery and Protection Plans § 3482.2 Action on plans. (a)(1) Exploration plans. The... with the approval terms of the exploration plan. (2) Resource recovery and protection plans. No resource recovery and protection plan or modification thereto shall be approved which is not in...

  1. 43 CFR 3482.2 - Action on plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Exploration and Resource Recovery and Protection Plans § 3482.2 Action on plans. (a)(1) Exploration plans. The... with the approval terms of the exploration plan. (2) Resource recovery and protection plans. No resource recovery and protection plan or modification thereto shall be approved which is not in...

  2. 43 CFR 3482.2 - Action on plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Exploration and Resource Recovery and Protection Plans § 3482.2 Action on plans. (a)(1) Exploration plans. The... with the approval terms of the exploration plan. (2) Resource recovery and protection plans. No resource recovery and protection plan or modification thereto shall be approved which is not in...

  3. 43 CFR 3482.2 - Action on plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Exploration and Resource Recovery and Protection Plans § 3482.2 Action on plans. (a)(1) Exploration plans. The... with the approval terms of the exploration plan. (2) Resource recovery and protection plans. No resource recovery and protection plan or modification thereto shall be approved which is not in...

  4. Affirmative Action Plan, October 1991--September 1992

    SciTech Connect

    Not Available

    1991-10-01

    This report documents Reynolds Electrical Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the Handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations. All personnel decisions are made at the Company level. Decisions regarding the General Manager or Deputy General Manager are made at the corporate level.

  5. 29 CFR 1926.35 - Employee emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... actions under the plan change, and (iii) Whenever the plan is changed. (3) The employer shall review with... the employee in the event of an emergency. The written plan shall be kept at the workplace and made...

  6. 24 Command Fire Improvement Action Program Plan

    SciTech Connect

    GRIFFIN, G.B.

    2000-12-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

  7. Clean slate corrective action investigation plan

    SciTech Connect

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

  8. SADC establishes a regional action plan.

    PubMed

    Klouda, T

    1997-02-01

    The regional meeting held on AIDS strategy in Lilongwe, Malawi, in December, 1996, made important advances. The 12 countries of the SADC (Southern Africa Development Community) joined the European Union to institute a regional action plan for the reduction of susceptibility of people to HIV because of social, cultural, and environmental factors; the vulnerability of people with HIV infection to social and other difficulties; and the vulnerability of institutions because of the foregoing impacts. At the conference the issues explored were employment, mining, medical drugs, education, and tourism. An employment charter was seen as crucial for the success of AIDS and workplace activities. Facilitation of travel across borders was important for the reduction of susceptibility to HIV infection. Enhancement of regional policies for essential drugs was vital for drugs for the treatment of AIDS. The clarification of the regional role was critical for regional support of national action (strengthening technical and institutional capacities) and for regional joint action such as studies on research, harmonization of data collection on HIV/AIDS; organization of training; development of information and education on HIV/AIDS; facilitation of manufacturing of drugs and condoms; and the development of a regional information and education program about HIV/AIDS. The conference also clarified HIV/AIDS programs in relation to other health and socioeconomic problems.

  9. Determining robot actions for tasks requiring sensor interaction

    NASA Technical Reports Server (NTRS)

    Budenske, John; Gini, Maria

    1989-01-01

    The performance of non-trivial tasks by a mobile robot has been a long term objective of robotic research. One of the major stumbling blocks to this goal is the conversion of the high-level planning goals and commands into the actuator and sensor processing controls. In order for a mobile robot to accomplish a non-trivial task, the task must be described in terms of primitive actions of the robot's actuators. Most non-trivial tasks require the robot to interact with its environment; thus necessitating coordination of sensor processing and actuator control to accomplish the task. The main contention is that the transformation from the high level description of the task to the primitive actions should be performed primarily at execution time, when knowledge about the environment can be obtained through sensors. It is proposed to produce the detailed plan of primitive actions by using a collection of low-level planning components that contain domain specific knowledge and knowledge about the available sensors, actuators, and sensor/actuator processing. This collection will perform signal and control processing as well as serve as a control interface between an actual mobile robot and a high-level planning system. Previous research has shown the usefulness of high-level planning systems to plan the coordination of activities such to achieve a goal, but none have been fully applied to actual mobile robots due to the complexity of interacting with sensors and actuators. This control interface is currently being implemented on a LABMATE mobile robot connected to a SUN workstation and will be developed such to enable the LABMATE to perform non-trivial, sensor-intensive tasks as specified by a planning system.

  10. Affirmative Action Plans, January 1, 1994--December 31, 1994. Revision

    SciTech Connect

    Not Available

    1994-02-16

    This document is the Affirmative Action Plan for January 1, 1994 through December 31, 1994 for the Lawrence Berkeley Laboratory, University of California (``LBL`` or ``the Laboratory.``) This is an official document that will be presented upon request to the Office of Federal Contract Compliance Programs, US Department of Labor. The plan is prepared in accordance with the Executive Order 11246 and 41 CFR Section 60-1 et seq. covering equal employment opportunity and will be updated during the year, if appropriate. Analyses included in this volume as required by government regulations are based on statistical comparisons. All statistical comparisons involve the use of geographic areas and various sources of statistics. The geographic areas and sources of statistics used here are in compliance with the government regulations, as interpreted. The use of any geographic area or statistic does not indicate agreement that the geographic area is the most appropriate or that the statistic is the most relevant. The use of such geographic areas and statistics is intended to have no significance outside the context of this Affirmative Action Plan, although, of course, such statistics and geographic areas will be used in good faith with respect to this Affirmative Action Plan.

  11. 46 CFR 169.305 - Plans required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... integration into the ship's structure. (14) Rigging plan showing sail areas and centers of effort as well as... descriptions in lieu of any of the required drawings provided the required information is adequately...

  12. 46 CFR 169.305 - Plans required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... integration into the ship's structure. (14) Rigging plan showing sail areas and centers of effort as well as... descriptions in lieu of any of the required drawings provided the required information is adequately...

  13. Hanford Action Tracking System release planning support documents

    SciTech Connect

    Keasling, R.

    1995-05-05

    This document contains impacts, plans, resource requirements, schedules, and documents to ensure the conduct of activities for the operation of the Hanford Action Tracking System (HATS). Each discrete topic in this document applies to a specific area of management and team interaction. These formally establish the planning, resources, documentation, and training responsibilities for the system management team. This document is composed of four appendices. These include the following: (1) organization impacts and implementation plan--expected organizational impacts resulting from setting up the new support system for the HATS, the plan to address each of these impacts and other system implementation requirements; (2) training and information requirements--training and information needed to use and operate the HATS; (3) operation/maintenance resources--resources required to maintain and operate the HATS once the system becomes operations; (4) training package--HATS implementation training needs, includes a training procedure, the environment for training users (tools and materials required for the facility, trainer, and trainee); schedule, and handout materials and forms to be completed at the time of training.

  14. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Consortia; Contents of Consolidated... to be undertaken to pursue its strategic plan. The consolidated plan must provide this...

  15. Site action plan for maintenance management program. Revision D

    SciTech Connect

    Pearson, A.W.

    1993-11-30

    (DOE) Order 4330.4B, ``Maintenance Management Program`` requires each site to develop a Site Action Plan for implementing a Maintenance Management Program. Nonnuclear facilities are required to address the 32 elements of Chapter 1: Guidelines for the Conduct of Maintenance at DOE Nonnuclear Facilities. This document details the degree of implementation for each element, and the Martin Marietta Specialty Components, Inc., plan for implementation of the items which remain to be completed. The original Pinellas Plant Maintenance Management Program Site Action Plan (Issue A) was completed March 27, 1991. The format was modified per DOE request and it was resubmitted as Issue B and approved by AL September 16, 1991. Issue C was submitted, and approved December 20, 1992. The most significant achievement during FY-93 were the implementation of plant wide Graded Approach, and Configuration Control programs. The methodologies for performing these activities were developed, and pilot programs were implemented to verify their effectiveness. Plant wide implementation of both programs is progressing on a high priority basis. The formalized method for grading equipment and facilities provides a basis for establishing uniform, risk based priorities. The risks involved are environment, safety, health and programmatic mission. Other achievements for FY-93, include the establishment of procedures for the decommissioning, and down-grading of facilities, improved work control, improved work performance reporting, improved quality plans, and improved operating procedures.

  16. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...

  17. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...

  18. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...

  19. Plans and Social Actions. Technical Report No. 34.

    ERIC Educational Resources Information Center

    Bruce, Bertram

    Our understanding of a story is highly dependent upon our ability to recognize the underlying purpose for actions described in the story. We need to view those actions as steps in, or reactions to, plans. This paper sketches some of the components of a model for the understanding of plans and social actions. The model is first applied to narrative…

  20. Global tropospheric chemistry: A plan for action

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Prompted by an increasing awareness of the influence of human activity on the chemistry of the global troposphere, a panel was formed to (1) assess the requirement for a global study of the chemistry of the troposphere; (2) develop a scientific strategy for a comprehensive plan taking into account the existing and projected programs of the government; (3) assess the requirements of a global study in terms of theoretical knowledge, numerical modeling, instrumentation, observing platforms, ground-level observational techniques, and other related needs; and (4) outline the appropriate sequence and coordination required to achieve the most effective utilization of available resources. Part 1 presents a coordinated national blueprint for scientific investigations of biogeochemical cycles in the global troposphere. part 2 presents much of the background information of the present knowledge and gaps in the understanding of tropospheric chemical cycles and processes from which the proposed program was developed.

  1. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work... actions under the plan change; and (C) Whenever the plan is changed. (iii) The employer shall review with... the employee in the event of an emergency. The written plan shall be kept at the workplace and be made...

  2. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... designated actions under the plan change; and (iii) Whenever the plan is changed. (3) The employer shall... protect the employee in the event of an emergency. The written plan shall be kept at the workplace and...

  3. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation

  4. ORD Strategic Action Plan for Information Management / Information Technology 2011

    EPA Science Inventory

    ORD's Strategic Action Plan for IM/IT (2011) was collaboratively developed with input from ORD research and administrative personnel. It identifies actions necessary to support ORD's priority IM and IT needs.

  5. ORD Strategic Action Plan for Information Management / Information Technology 2011

    EPA Science Inventory

    ORD's Strategic Action Plan for IM/IT (2011) was collaboratively developed with input from ORD research and administrative personnel. It identifies actions necessary to support ORD's priority IM and IT needs.

  6. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work.... (ii) The employer shall review the plan with each employee covered by the plan at the following times...

  7. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work.... (ii) The employer shall review the plan with each employee covered by the plan at the following times...

  8. 41 CFR 60-4.4 - Affirmative action requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.4 Affirmative action requirements. (a) To implement the affirmative action requirements of Executive Order 11246 in the construction industry, the Office of Federal Contract Compliance Programs previously has approved affirmative action...

  9. 41 CFR 60-4.4 - Affirmative action requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.4 Affirmative action requirements. (a) To implement the affirmative action requirements of Executive Order 11246 in the construction industry, the Office of Federal Contract Compliance Programs previously has approved affirmative action...

  10. 41 CFR 60-4.4 - Affirmative action requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.4 Affirmative action requirements. (a) To implement the affirmative action requirements of Executive Order 11246 in the construction industry, the Office of Federal Contract Compliance Programs previously has approved affirmative action...

  11. 41 CFR 60-4.4 - Affirmative action requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.4 Affirmative action requirements. (a) To implement the affirmative action requirements of Executive Order 11246 in the construction industry, the Office of Federal Contract Compliance Programs previously has approved affirmative action...

  12. 41 CFR 60-4.4 - Affirmative action requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OF LABOR 4-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.4 Affirmative action requirements. (a) To implement the affirmative action requirements of Executive Order 11246 in the construction industry, the Office of Federal Contract Compliance Programs previously has approved affirmative action...

  13. Functional exercise of Kingsley Dam emergency action plan

    SciTech Connect

    Boyd, K.M.

    1995-12-31

    At the request of the Federal Energy Regulatory Commission (F.E.R.C.), the Central Nebraska Public Power and Irrigation District (Central) performed a Functional Test of the Kingsley Dam Emergency Action Plan (E.A.P.) on October 27, 1992. The purpose of the exercise was to evaluate the Emergency Action Plan under a stress-induced environment with time constraints that exercised skills which are required for emergency management. This exercise was unique as it took place simultaneously at three different sites: North Platte Holiday Inn, Lincoln County Civil Defense Headquarters and the Keith County Civil Defense Office. Fifty miles separated the two Civil Defense Headquarters. There was a mobile command post that allowed radio communications between the different Civil Defenses offices. During the exercise, both levels of the E.A.P. (hazardous situation developing and failure has occurred) were tested. Both Keith and Lincoln County Civil Defense offices were able to test their own preparedness plans and communications. Besides the successful tests of the plans, a cooperative spirit was strengthened among the agencies as well as an exchange of knowledge and resources.

  14. Case-Based Plan Recognition Using Action Sequence Graphs

    DTIC Science & Technology

    2014-10-01

    algorithm based on plan tree grammars. Artificial Intelligence, 173(11), 1101-1132. Ghallab,M., Nau, D., & Traverso, P. (2004). Automated planning : Theory ...Case-Based Plan Recognition Using Action Sequence Graphs Swaroop S. Vattam1, David W. Aha2 and Michael Floyd3 1NRC Postdoctoral Fellow; Naval...knexusresearch.com Abstract. We present SET-PR, a novel case-based plan recognition algorithm that is tolerant to missing and misclassified actions in its

  15. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or any...

  16. 24 CFR 761.21 - Plan requirement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Plan requirement. 761.21 Section... PUBLIC AND INDIAN HOUSING PROGRAMS) DRUG ELIMINATION PROGRAMS Application and Selection § 761.21 Plan... AHDEP applicant must submit to HUD, for Federal Fiscal Year (FFY) 2000 and each following FFY, a...

  17. 24 CFR 761.21 - Plan requirement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Plan requirement. 761.21 Section... PUBLIC AND INDIAN HOUSING PROGRAMS) DRUG ELIMINATION PROGRAMS Application and Selection § 761.21 Plan... AHDEP applicant must submit to HUD, for Federal Fiscal Year (FFY) 2000 and each following FFY, a...

  18. Features of planned hand actions influence identification of graspable objects.

    PubMed

    Bub, Daniel N; Masson, Michael E J; Lin, Terry

    2013-07-01

    We demonstrate that constituents of motor actions associated with handled objects play a role in identifying such objects. Subjects held in working memory action plans for reaching movements; these action plans specified both the hand to be used (left or right) and a wrist orientation (vertical or horizontal). Speeded object identification was impaired when a pictured object matched the action on only one of these two categorical dimensions (e.g., a beer mug with its handle facing left, an action plan involving the right hand and vertical wrist orientation), relative to when the object matched the action on both dimensions or neither dimension. This result implies that identification of a manipulable object leads to automatic retrieval of matching features of a planned action along with nonmatching features to which they are bound. These discrepant features conflict with those of the target object, which results in delayed identification.

  19. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  20. Maintaining technical excellence requires a national plan

    NASA Technical Reports Server (NTRS)

    Davidson, T. F.

    1991-01-01

    To meet the challenge of technical excellence, AIA established a rocket propulsion committee to develop the National Rocket Propulsion Strategic Plan. Developing such a plan required a broad spectrum of experience and disciplines. The Strategic Plan team needed the participation of industry, government, and academia. The plan provides, if followed, a means for the U.S. to maintain technical excellence and world leadership in rocket propulsion. To implement the National Rocket Propulsion Strategic Plan is to invest in the social, economic, and technological futures of America. The plan lays the basis for upgrading existing propulsion systems and a firm base for future full scale development, production, and operation of rocket propulsion systems for space, defense, and commercial applications.

  1. Prairie Conservation in Canada: The Prairie Conservation Action Plan Experience

    Treesearch

    Dean Nernberg; David Ingstrup

    2005-01-01

    In Canada, grassland conservation has been mobilized and directed through the development of Prairie Conservation Action Plans and Action Plan Committees in the three prairie provinces of Alberta (45 partner agencies and organizations), Saskatchewan (26 partners), and Manitoba (26 partners). In Alberta, 43 percent of the native prairie remains; in Saskatchewan and...

  2. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document is a compilation of different issues identified by the Tiger Teams at the several locations of the Sandia National Laboratory. In this volume there are findings/concerns and the resultant responses and planned actions for these issues. Also included are the schedules and costs for the planned actions.

  3. Individual Action Planning: A Case of Self-Surveillance?

    ERIC Educational Resources Information Center

    Lawson, Tony; Harrison, Jennifer; Cavendish, Susan

    2004-01-01

    The authors explore the Foucauldian concept of self-surveillance in the context of the use of Individual Action Planning (IAP) as a central process of a 1-year teacher training course. Drawing on work that examined whether IAP was experienced by student-teachers as empowerment or control, the article postulates that Action Planning can be seen as…

  4. Education for All: National Plan of Action, 2003-2015

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    Background: The Lao People's Democratic Republic (PDR) Education for All National Plan of Action (EFA NPA) for 2003-2015 seeks to accomplish three major tasks: equitable access, improved quality and relevance and strengthened education management. Purpose: To design a National Education For All Action Plan for basic education in Lao PDR which…

  5. Indiana's Comprehensive Action Plan for Adult Education Programs.

    ERIC Educational Resources Information Center

    Indiana State Dept. of Education, Indianapolis.

    Indiana's Comprehensive Action Plan (I-CAP) provides a framework for program excellence, accountability, and continuous improvement in adult education. The action plan includes guiding principles and benchmarks for quality programs. Adult education programs are evaluated annually on these 10 established principles of program quality: educational…

  6. Health action plans for people with learning disabilities.

    PubMed

    Howatson, John

    This article describes the design of a health action plan included in a care package for a person with learning disabilities. It provides working knowledge and guidance to students, nurses and service providers who are currently undertaking similar interventions. The rationale for developing the health action plan is explained and the intervention is detailed in relation to the person's circumstances.

  7. Adult Basic Skills: Developing a Local Action Plan.

    ERIC Educational Resources Information Center

    Basic Skills Agency, London (England).

    This document presents advice from the United Kingdom's Basic Skills Agency regarding developing local action plans. The first 20% of the document defines basic skills and discusses the following action plan components: (1) an estimate of the area's need for basic skills training; (2) a target to reduce the area's estimated scale of need; (3)…

  8. Planning sensing actions for UAVs in urban domains

    NASA Astrophysics Data System (ADS)

    Peot, Mark A.; Altshuler, Thomas W.; Breiholz, Arlen; Bueker, Richard A.; Fertig, Kenneth W.; Hawkins, Aaron T.; Reddy, Sudhakar

    2005-10-01

    We illustrate an approach for planning UAV sensing actions in urban or constrained domains. We plan and optimize a collection strategy for a target of interest using Design Sheet, a numeric/symbolic algebraic constraint propagation package. Once a set of sensing plans have been developed, we use a probabilistic roadmap planning algorithm to plan a route for a fixed wing UAV through urban terrain to collect that information. This planner has several novel features to improve performance for urban domains.

  9. 25 CFR 47.9 - What are the minimum requirements for the local educational financial plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... educational financial plan? 47.9 Section 47.9 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR... requirements for the local educational financial plan? (a) The local educational financial plan must include...) Certification by the chairman of the school board that the plan has been ratified in an action of record by the...

  10. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2009-03-31

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12

  11. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  12. Smart Buildings: Business Case and Action Plan

    SciTech Connect

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  13. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... to be undertaken to pursue its strategic plan. The consolidated plan must provide this description... each individual community that is a member of the consortium. (Approved by the Office of Management and...

  14. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... to be undertaken to pursue its strategic plan. The consolidated plan must provide this description... each individual community that is a member of the consortium. (Approved by the Office of Management and...

  15. Action control bridges the planning-behaviour gap: a longitudinal study on physical exercise in young adults.

    PubMed

    Reyes Fernández, Benjamín; Fleig, Lena; Godinho, Cristina A; Montenegro Montenegro, Esteban; Knoll, Nina; Schwarzer, Ralf

    2015-01-01

    Maintaining physical exercise levels may not only require motivation and planning but also action control which is supposed to mediate between planning and exercise. Behavioural intention, action planning, coping planning and past behaviour were assessed at baseline, and action control and concurrent exercise were measured one month later in 497 young adults. Three nested structural models were specified to examine different mediation mechanisms. One model reflected the intention-planning-behaviour chain, the other one focused on the intention-action control-behaviour chain and the third model comprised the full sequence. Indirect effects from intentions on exercise involved either planning or action control as mediating variables. In Model 3, all three constructs (action planning, coping planning and action control) were sequential mediators between intentions and later physical exercise levels. Action and coping planning were not directly but indirectly related to exercise via action control. Findings support the sequential mediation for planning and action control as antecedents of physical exercise. Action control is needed for exercise, because planning in itself is not always sufficient. Maintaining exercise levels may be attributed to effective self-regulatory strategies such as action control in combination with planning.

  16. Preparation, review, and approval of implementation plans for nuclear safety requirements

    SciTech Connect

    Not Available

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals.

  17. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Local Governments; Contents of...) Resources and objectives—(1) Federal resources. The consolidated plan must provide a concise summary of the federal resources (including grant funds and program income) expected to be made available. Federal...

  18. Business System Planning Project System Requirements Specification

    SciTech Connect

    NELSON, R.E.

    2000-09-08

    The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

  19. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action.

    PubMed

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations.

  20. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action

    PubMed Central

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations. PMID:27606968

  1. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action.

    PubMed

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations.

  2. Corrective Action Investigation Plan for Corrective Action Unit 500: Test Cell A Septic System, Nevada Test Site, Nevada

    SciTech Connect

    IT Las Vegas

    1999-01-27

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s), and may include solid waste management units, individual disposal sites, or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP will be used in conjunction with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998c), hereafter referred to as the Leachfield Work Plan. Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. This CAIP contains CAU-specific information including a facility description, environmental sample collection objectives, and the criteria for conducting site investigation activities at CAU 500. This CAIP addresses one of three leachfield systems associated with Test Cell A, which is located in Area 25 at the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (see Leachfield Work Plan Figure 1-1). Corrective Action Unit 500 is comprised of the Test Cell A Septic System (CAS 25-04-05) and the associated leachfield system presented in Figure 1-1 (FFACO, 1996).

  3. Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    SciTech Connect

    T. M. Fitzmaurice

    2000-05-01

    This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

  4. Action, perception and postural planning when reaching for tools.

    PubMed

    Sunderland, Alan

    2013-06-01

    The dorsal and ventral streams model of action and perception suggests that reaching to grasp a tool for use involves integrated operation of the two streams. Few attempts have been made to test the limits of this integration in normal subjects. Twenty normal subjects reached for tools or geometric objects which were rotated rapidly during reaching or immediately beforehand. In a first experiment it was shown that reaching for an inverted tool was slower than reaching for objects which required hand inversion due to proximity to a physical barrier. Also, for the right hand, tool rotation during reaching provoked a higher incidence of hand rotation in the wrong direction than did rotation of objects. In a second similar experiment, hand inversion when grasping objects was induced by the need to plan a future action rather than by proximity of a physical barrier. Despite this balancing of complexity of postural planning for tools and objects, hand rotation errors for both hands were more common for tools than objects. This was consistent with the two-stream model in suggesting that there was a process which produced rapid online tracking of stimulus rotation and this had to be overcome by a slower process which dictated grasping in accordance with knowledge of tool use.

  5. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... actions steps for reducing and ending homelessness through: (i) Reaching out to homeless persons... period of time that individuals and families experience homelessness, facilitating access for homeless... rent; mortgage and utility assistance payments to prevent homelessness of the individual or...

  6. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... permanent housing and independent living, specific action steps to end chronic homelessness, and to address... payments to prevent homelessness of the individual or family; tenant-based rental assistance; and...

  7. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... actions steps for reducing and ending homelessness through: (i) Reaching out to homeless persons... period of time that individuals and families experience homelessness, facilitating access for homeless... rent; mortgage and utility assistance payments to prevent homelessness of the individual or...

  8. Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada

    SciTech Connect

    Bechtel Nevada

    1998-08-31

    This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

  9. USAF Affirmative Actions Plan. A Historical Perspective

    DTIC Science & Technology

    1984-04-01

    five target groups : Black, Hispanic, Other Racial Minority, Women, and Caucasian Male. This change provided a better analysis of affirmative actions for...Blacks and Other Racial Minorities and enabled a comparison between the minority target groups and the remainder of the Air Force population (i.e...Caucasian Male). Regarding this latter point, some field commanders contended that positive results in the affirmative action target groups were at the

  10. 24 CFR 761.21 - Plan requirement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Plan requirement. 761.21 Section 761.21 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE SECRETARY, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HOUSING ASSISTANCE PROGRAMS...

  11. 24 CFR 761.21 - Plan requirement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-supported activities and describe the system for monitoring and evaluating these activities. Measurable... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Plan requirement. 761.21 Section 761.21 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued...

  12. Planning Requirements for Small School Facilities.

    ERIC Educational Resources Information Center

    Davis, J. Clark; McQueen, Robert

    The unique requirements of small school facilities, designed to handle multiple curricular functions within the same operational space, necessitate the creation of educational specifications tying the curriculum to that portion of the facility in which each curriculum component will be implemented. Thus, in planning the facility the major concern…

  13. North Slope (Wahluke Slope) expedited response action cleanup plan

    SciTech Connect

    Not Available

    1994-02-01

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

  14. Goal Reconstruction: How Teton Blends Situated Action and Planned Action

    DTIC Science & Technology

    1989-11-03

    5. Appendix: Teton 36 5.1. Knowledge representation 36 5.2. The execution cycle 37 5.3. Memories 39 Accssj-,n For NTIS 2A&I J, ’I, : t I .... J/J...Conclusions 35 5. Appendix: Teton 36 5.1. Knowledge representation 36 5.2. The execution cycle 37 5.3. Memories 39 When you purchase a programming language...inadequacies in current accounts of human working memory for goals. The third problem is that current accounts of problem solving overemphasize planning

  15. Stage II Remedial Action Plan Deer Lake AOC

    EPA Pesticide Factsheets

    Michigan Department of Environmental Quality reports on actions taken that have resulted in the removal of two beneficial use impairments. Outlines plans to remove remaining BUI and to delist the Area Of Concern.

  16. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or...

  17. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or...

  18. Climate Action Planning at the University of New Hampshire

    ERIC Educational Resources Information Center

    Cleaves, Sara M.; Pasinella, Brett; Andrews, Jennifer; Wake, Cameron

    2009-01-01

    Purpose: The purpose of this paper is to discuss the recent history of climate action planning at the University of New Hampshire (UNH), a public university with a long history of sustainability action and commitment. Items discussed include a partnership with Clean Air-Cool Planet (CA-CP) to produce a greenhouse gas (GHG) inventory tool that…

  19. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  20. Climate Action Planning at the University of New Hampshire

    ERIC Educational Resources Information Center

    Cleaves, Sara M.; Pasinella, Brett; Andrews, Jennifer; Wake, Cameron

    2009-01-01

    Purpose: The purpose of this paper is to discuss the recent history of climate action planning at the University of New Hampshire (UNH), a public university with a long history of sustainability action and commitment. Items discussed include a partnership with Clean Air-Cool Planet (CA-CP) to produce a greenhouse gas (GHG) inventory tool that…

  1. The New Haven Department of Education Affirmative Action Plan 1974.

    ERIC Educational Resources Information Center

    New Haven Public Schools, CT.

    The New Haven public schools affirmative action report contains statements of purpose, policy, and responsibility in conjunction with a plan of action to ensure that job applicants and employees receive fair consideration without regard to their race, color, religion, sex, or national origin. The goals and timetables established will rectify…

  2. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  3. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  4. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  5. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  6. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 4 2011-07-01 2011-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  7. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  8. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Administration of affirmative action plan. 906.5 Section 906.5 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative...

  9. Gallaudet College Equal Employment Opportunity Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Gallaudet Coll., Washington, DC.

    This document details the Affirmative Action Plan in effect at Gallaudet College. Following a policy statement, chapter 2 indicated the affirmative action procedures followed in the areas of policy dissemination, administration and monitoring, reporting and evaluation, training and development programs, recruitment, promotion and selection,…

  10. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.4...

  11. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 4 2014-07-01 2014-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.4...

  12. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 4 2012-07-01 2012-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.4...

  13. 46 CFR 91.55-20 - Number of plans required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Number of plans required. 91.55-20 Section 91.55-20... INSPECTION AND CERTIFICATION Plan Approval § 91.55-20 Number of plans required. (a) Three copies of each plan... additional approved plans, a suitable number should be submitted to permit the required distribution. ...

  14. 46 CFR 189.55-20 - Number of plans required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Number of plans required. 189.55-20 Section 189.55-20... AND CERTIFICATION Plan Approval § 189.55-20 Number of plans required. (a) Three copies of each plan... additional approved plans, a suitable number should be submitted to permit the required distribution. ...

  15. Student-Industry Plan for Action.

    ERIC Educational Resources Information Center

    National Association of Manufacturers, New York, NY. Education Committee.

    The guidelines for a student-industry action committee represent an attempt by the authors to reverse the trend of mistrust demonstrated by the American public toward business and industry. Twelve chapter presidents of Delta Sigma Pi, a university business fraternity, met initially with representatives of the National Association of Manufacturers…

  16. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... actions steps for reducing and ending homelessness through: (i) Reaching out to homeless persons... period of time that individuals and families experience homelessness, facilitating access for homeless... homelessness of the individual or family; tenant-based rental assistance; and units provided in...

  17. Crisis action planning and replanning using SIPE-2

    NASA Technical Reports Server (NTRS)

    Skidmore, Jennifer D.

    1993-01-01

    Rome Laboratory and DARPA are jointly sponsoring an initiative to develop the next generation of AI planning and scheduling technology focused on military operations planning, especially for crisis situations. SRI International has demonstrated their knowledge-based planning technology in this domain with a system called SOCAP, System for Operations Crisis Action Planning. SOCAP's underlying power comes from SIPE-2, a hierarchical, domain-independent, nonlinear AI planner also developed at SRI. This paper discusses the features of SIPE-2 that made it an ideal choice for military operations planning and which contributed greatly to SOCAP's success.

  18. 75 FR 55973 - Salvage and Marine Firefighting Requirements; Vessel Response Plans for Oil

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... Response Plans for Oil AGENCY: Coast Guard, DHS. ACTION: Rule; information collection approval... firefighting requirements for tank vessels carrying oil. That announcement indicated that the collection of... Plans for Oil'' (73 FR 80618). The final rule amended the vessel response plan salvage and...

  19. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... have if awarded the contract, a workforce of 50 or more employees, must develop a written affirmative... authorizations to which this part applies. A summary of such plan should be included with the bid submitted to... or more must develop a written affirmative action plan under paragraph (c)(3) of this section...

  20. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., must develop a written affirmative action plan consistent with paragraphs (c) (1) and (2) of this... activities conducted pursuant to Federal authorizations to which this part applies. A summary of such plan... more employees. (3) All bidders for contracts of $150,000 or more must develop a written affirmative...

  1. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., must develop a written affirmative action plan consistent with paragraphs (c) (1) and (2) of this... activities conducted pursuant to Federal authorizations to which this part applies. A summary of such plan... more employees. (3) All bidders for contracts of $150,000 or more must develop a written affirmative...

  2. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency... area. (4) Evacuation. The employer shall establish the types of evacuation to be used in emergency... each employee upon initial assignment those parts of the plan that the employee must know to protect...

  3. Action Planning: Rowing in the Same Direction

    ERIC Educational Resources Information Center

    Hewson, Kurtis; Adrian, Lorna

    2008-01-01

    Two years ago, as Claresholm Elementary School prepared for a new year with a new principal, it had the usual shopping list of ambitions--focus on student learning, support the staff, empower parents, and more. However, in examining the school's improvement plan it became apparent that the school staff had a unique opportunity to develop solid…

  4. Monitoring the Curriculum: From Plan to Action.

    ERIC Educational Resources Information Center

    Maglaras, Tom; Lynch, Deborah

    1988-01-01

    The Aurora Public School System (Colorado) has devised a plan to ensure implementation of the adopted curriculum. By developing a program monitoring process and incorporating it in a handbook, staff can rate their behavior and use "green flags" or "red alerts" to characterize subject area strengths and deficiencies. (MLH)

  5. Hawaii's Adolescent Wellness Plan: Laulima in Action.

    ERIC Educational Resources Information Center

    Hawaii State Dept. of Health, Honolulu.

    Based on a need in Hawaii for a multilevel responsibility and commitment to ensure adolescent wellness, the Hawaii Adolescent Wellness Team developed a plan based on research and discussions with a variety of professionals and community leaders in health, education, and social service. This resource handbook is designed to assist communities in…

  6. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... local government, and the Program Coordinating Committee. (c) Plan submission—(1) Initial submission—(i... local FSS program, and shall contain, at a minimum, the following information: (1) Family demographics...; (2) Estimate of participating families. A description of the number of eligible FSS families who can...

  7. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... local government, and the Program Coordinating Committee. (c) Plan submission—(1) Initial submission—(i... local FSS program, and shall contain, at a minimum, the following information: (1) Family demographics...; (2) Estimate of participating families. A description of the number of eligible FSS families who can...

  8. Action Planning: Rowing in the Same Direction

    ERIC Educational Resources Information Center

    Hewson, Kurtis; Adrian, Lorna

    2008-01-01

    Two years ago, as Claresholm Elementary School prepared for a new year with a new principal, it had the usual shopping list of ambitions--focus on student learning, support the staff, empower parents, and more. However, in examining the school's improvement plan it became apparent that the school staff had a unique opportunity to develop solid…

  9. Action Planning in Young Children's Tool Use

    ERIC Educational Resources Information Center

    Cox, Ralf F. A.; Smitsman, Ad W.

    2006-01-01

    Tool use consists of at least two coupled phases of activities, involving multi-step problem solving. It therefore provides an interesting window on the development of planning in goal-directed behavior. This study investigated 2-year-olds' and 3-year-olds' hand use in picking up and subsequently using a tool for displacing a target-object towards…

  10. Cowley County Community College Plan of Action.

    ERIC Educational Resources Information Center

    Nelson, Gwen

    The document presents a comprehensive plan for developing Cowley County Community College and Vocational-Technical School into a stronger community institution. It currently has over 1,400 students enrolled in a variety of general, occupational, and continuing education programs with more than half of the students coming from five counties in…

  11. Monitoring the Curriculum: From Plan to Action.

    ERIC Educational Resources Information Center

    Maglaras, Tom; Lynch, Deborah

    1988-01-01

    The Aurora Public School System (Colorado) has devised a plan to ensure implementation of the adopted curriculum. By developing a program monitoring process and incorporating it in a handbook, staff can rate their behavior and use "green flags" or "red alerts" to characterize subject area strengths and deficiencies. (MLH)

  12. Building air quality: Action plan, June 1998

    SciTech Connect

    1998-11-01

    To promote the use of these straightforward practices to improve IAQ, EPA and other leaders in the IAQ field developed this 8-step plan. This additional resource meets the needs of building owners and managers who want an easy-to-understand path for taking their building from current conditions and practices to the successful institutionalization of good IAQ management practices.

  13. White House Climate Action Plan Hotly Debated in Senate Hearing

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2014-01-01

    Emotions ran high among senators at a 16 January U.S. Senate hearing on the White House's Climate Action Plan; the hearing included administration officials and other supporters of the plan as well as opponents. The plan, which President Barack Obama presented in June 2013 (see Eos, 94(27), 239, doi:10.1002/2013EO270003), calls for cutting carbon pollution, preparing the nation for the impacts of climate change, and leading international efforts to address climate change.

  14. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS... implementing agency should consider the following factors as appropriate: (1) The physical and...

  15. 42 CFR 441.252 - State plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Sterilizations § 441.252 State plan requirements. A State plan must provide that the Medicaid agency will make payment under the plan for sterilization procedures and hysterectomies only if all the requirements of...

  16. 42 CFR 441.252 - State plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Sterilizations § 441.252 State plan requirements. A State plan must provide that the Medicaid agency will make payment under the plan for sterilization procedures and hysterectomies only if all the requirements of...

  17. McClellan AFB Management Action Plan (MAP) submittal

    SciTech Connect

    Not Available

    1992-12-23

    This Management Action Plan ('Action Plan' or 'MAP') contains a status summary of the McClellan Air Force Base (McAFB) environmental restoration and compliance programs and presents a comprehensive strategy for implementing response actions necessary to protect human health and the environment. This strategy integrates activities under both the Installation Restoration Program (IRP) and the Environmental Compliance Program (ECP). This Action Plan is a dynamic document that will be updated on a regular basis using the change-a-page looseleaf binder concept for day-to-day revisions along with a subsection at the end of each chapter to highlight any modifications or innovations since the previous major annual review/update.

  18. 49 CFR 659.37 - Corrective action plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requiring corrective actions; and (2) Findings from safety and security reviews performed by the oversight..., DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight... that a proposed alternate action(s) has been implemented subject to oversight agency review...

  19. New law requires 'medically accurate' lesson plans.

    PubMed

    1999-09-17

    The California Legislature has passed a bill requiring all textbooks and materials used to teach about AIDS be medically accurate and objective. Statements made within the curriculum must be supported by research conducted in compliance with scientific methods, and published in peer-reviewed journals. Some of the current lesson plans were found to contain scientifically unsupported and biased information. In addition, the bill requires material to be "free of racial, ethnic, or gender biases." The legislation is supported by a wide range of interests, but opposed by the California Right to Life Education Fund, because they believe it discredits abstinence-only material.

  20. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... Management of Infertility. The draft plan can be found at http://www.regulations.gov Docket No. CDC-2012-0004... for the Prevention, Detection, and Management of Infertility, which was subsequently developed...

  1. 78 FR 16412 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Consent Decree Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Consent Decree Requirements AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY... is also approving public notice requirements for these permit actions. These rules will help...

  2. 78 FR 16449 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Consent Decree Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Consent Decree Requirements AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is... is also approving public notice requirements for these permit actions. These rules will help...

  3. The role of action planning and plan enactment for smoking cessation

    PubMed Central

    2013-01-01

    Background Several studies have reemphasized the role of action planning. Yet, little attention has been paid to the role of plan enactment. This study assesses the determinants and the effects of action planning and plan enactment on smoking cessation. Methods One thousand and five participants completed questionnaires at baseline and at follow-ups after one and six months. Factors queried were part of the I-Change model. Descriptive analyses were used to assess which plans were enacted the most. Multivariate linear regression analyses were used to assess whether the intention to quit smoking predicted action planning and plan enactment, and to assess which factors would predict quitting behavior. Subsequently, both multivariate and univariate regression analyses were used to assess which particular action plans would be most effective in predicting quitting behavior. Similar analyses were performed among a subsample of smokers prepared to quit within one month. Results Smokers who intended to quit smoking within the next month had higher levels of action planning than those intending to quit within a year. Additional predictors of action planning were being older, being female, having relatively low levels of cigarette dependence, perceiving more positive and negative consequences of quitting, and having high self-efficacy toward quitting. Plan enactment was predicted by baseline intention to quit and levels of action planning. Regression analysis revealed that smoking cessation after six months was predicted by low levels of depression, having a non-smoking partner, the intention to quit within the next month, and plan enactment. Only 29% of the smokers who executed relatively few plans had quit smoking versus 59% of the smokers who executed many plans. The most effective preparatory plans for smoking cessation were removing all tobacco products from the house and choosing a specific date to quit. Conclusion Making preparatory plans to quit smoking is important

  4. Process safety management and interim or remedial action plans

    SciTech Connect

    Boss, M.J.; Henney, D.A.; Heitzman, V.K.; Day, D.W.

    1996-12-31

    Remedial Actions, including Interim Remedial Activities, often require the use of treatment facilities or stabilization techniques using on-site chemical processes. As such, the 29 CFR 1910.119 Process Safety Management (PSM) of Highly Hazardous Chemicals (PSM Standard) and the USEPA regulations for Risk Management Planning require that these chemicals and their attendant potential hazards be identified. A Hazard and Operation (HAZOP) study, Failure Mode and Effect Analysis (FMEA), Fault Tree Analysis, or equivalent graphic presentation of processes must be completed. These studies form a segment of the Process Hazard Analysis (PHA). HAZOP addresses each system and each element of a system that could deviate from normal operations and thus cause a hazard. A full assessment of each process is produced by looking at the hazards, consequences, causes and personnel protection needed. Many variables must be considered when choosing the appropriate PHA technique including the size of the plant, the number of processes, the types of processes, and the types of chemicals used. A mixture of these techniques may be required to adequately transmit information about the process being evaluated.

  5. Resource-based action planning for multiagent systems

    NASA Astrophysics Data System (ADS)

    Freund, Eckhard; Hoffmann, Katharina; Rossmann, Juergen

    1998-10-01

    With the use of multi-robot-systems new chances and perspectives are revealed for industrial, space- and underwater-applications. At the IRF, a versatile multi- robot-control, which fully exploits the inherent flexibility of a multi-robot-system, has been developed. In order to guarantee optimized system-throughput and increased autonomy, the system builds on a new resource-based action planning approach to coordinate the different robot manipulators and other automation components in the workcell. An important issue of the realized action planning component to be applicable to real world problems is that it is realized as an integral part of the hierarchical multi- robot control structure IRCS (Intelligent Robot Control System). The IRCS is the multi-robot control that was chosen by the German Space Agency (DLR) for major space automation projects. In this structure the resource-based action planning component is tightly integrated with components for coordinated task execution and collision avoidance to guarantee save operation of all agents in the multi-robot system. As the action planning component `understands' task descriptions on a high level of abstraction it is also the perfect counterpart for a Projective Virtual Reality (VR) system. The paper will describe the mechanism of resource based action planning, the practical experiences gained from the implementation for the IRCS as well as its services to support VR-based man machine interfaces.

  6. 43 CFR 3809.411 - What action will BLM take when it receives my plan of operations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What action will BLM take when it receives... Operations § 3809.411 What action will BLM take when it receives my plan of operations? (a) BLM will review... is complete, that is, it meets the content requirements of § 3809.401(b); (2) Your plan does...

  7. 14 CFR 1216.305 - Actions requiring environmental assessments.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... result in impacts that require analysis in an EIS. The Responsible Official will consider the scope of the action and the context and intensity of any environmental impacts when determining whether to prepare an EA. (b) Typical NASA actions normally requiring an EA include: (1) Specific...

  8. The development and comprehensibility of a pictorial asthma action plan.

    PubMed

    Roberts, Nicola J; Mohamed, Zeinab; Wong, Pei-Se; Johnson, Marianne; Loh, Li-Cher; Partridge, Martyn R

    2009-01-01

    Written action plans are regarded as an important part of asthma self-management education and yet they may not be understood by those with limited literacy skills. This study was designed to produce an understandable pictorial asthma action plan. With advice from a group of doctors and nurses a "standard" written action plan was translated by a medical artist into a series of pictorial images. These were assessed using the techniques of guessability and translucency by a series of adults attending a specialist asthma clinic in London and the same process was subsequently used to assess comprehensibility of the images and plans amongst a group of Somalis living in Manchester, UK and Malaysians in Seremban, Malaysia. Guessability testing showed that the majority of pictograms were well understood by each of the study groups. Translucency testing revealed close agreement with intended meaning for the majority of the images. One image, depicting extra use of reliever medication scored less well in all populations; two other images scored less well in the Somali and Malaysian groups and reflect less use of certain inhaler devices in other countries. The overall plan was well understood by all patients who were able to adequately recount the appropriate actions to take in different clinical scenarios. We have developed a pictorial asthma action plan understandable by 3 different populations of patients with asthma. Pictorial representations have been shown by other studies in other situations to be an effective method of reinforcing the spoken word. The pictorial asthma action plan developed for this study has been shown to be comprehensible, personalised to the individual in the usual fashion. It is now suitable for further evaluation in clinical practice.

  9. NASA secondary payload plans, policies and requirements

    NASA Technical Reports Server (NTRS)

    Poniatowski, Karen S.

    1990-01-01

    A review is presented of the secondary or piggyback flight opportunities that are presently available along with an overview of NASA's secondary payload plans, policies and requirements. When there is excess capacity on either the Space Shuttle or an expendable launch vehicle (ELV), a logical step is to carry a secondary payload to provide a relatively low-cost launch for small satellites. NASA has already flown more than a dozen piggyback payloads on the Delta rocket. The Small Expendable Deployment system experiment is currently planned as the first of small space experiments launched as a piggyback on an ELV. Some details are provided on various secondary payload flight opportunities aboard the Space Shuttle including the Get-Away Special Canister Program, the complex autonomous payload, the Hitchhiker Program, and the middeck lockers concept. Also described are several secondary payload possibilities utilizing ELVs.

  10. 45 CFR 162.925 - Additional requirements for health plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Additional requirements for health plans. 162.925... requirements for health plans. (a) General rules. (1) If an entity requests a health plan to conduct a... payer). (c) Code sets. A health plan must meet each of the following requirements: (1) Accept and...

  11. Multi-action planning for threat management: a novel approach for the spatial prioritization of conservation actions.

    PubMed

    Cattarino, Lorenzo; Hermoso, Virgilio; Carwardine, Josie; Kennard, Mark J; Linke, Simon

    2015-01-01

    Planning for the remediation of multiple threats is crucial to ensure the long term persistence of biodiversity. Limited conservation budgets require prioritizing which management actions to implement and where. Systematic conservation planning traditionally assumes that all the threats in priority sites are abated (fixed prioritization approach). However, abating only the threats affecting the species of conservation concerns may be more cost-effective. This requires prioritizing individual actions independently within the same site (independent prioritization approach), which has received limited attention so far. We developed an action prioritization algorithm that prioritizes multiple alternative actions within the same site. We used simulated annealing to find the combination of actions that remediate threats to species at the minimum cost. Our algorithm also accounts for the importance of selecting actions in sites connected through the river network (i.e., connectivity). We applied our algorithm to prioritize actions to address threats to freshwater fish species in the Mitchell River catchment, northern Australia. We compared how the efficiency of the independent and fixed prioritization approach varied as the importance of connectivity increased. Our independent prioritization approach delivered more efficient solutions than the fixed prioritization approach, particularly when the importance of achieving connectivity was high. By spatially prioritizing the specific actions necessary to remediate the threats affecting the target species, our approach can aid cost-effective habitat restoration and land-use planning. It is also particularly suited to solving resource allocation problems, where consideration of spatial design is important, such as prioritizing conservation efforts for highly mobile species, species facing climate change-driven range shifts, or minimizing the risk of threats spreading across different realms.

  12. Action plan to reduce perinatal mortality.

    PubMed

    Bhakoo, O N; Kumar, R

    1990-01-01

    The government of India has set a goal of reducing perinatal mortality from its current rate of 48/1000 to 30-35/1000 by the year 2000. Perinatal deaths result from maternal malnutrition, inadequate prenatal care, complications of delivery, and infections in the postpartum period. Since reductions in perinatal mortality require attention to social, economic, and behavioral factors, as well as improvements in the health care delivery system, a comprehensive strategy is required. Social measures, such as raising the age at marriage to 18 years for females, improving the nutritional status of adolescent girls, reducing the strenuousness of work during pregnancy, improving female literacy, raising women's status in the society and thus in the family, and poverty alleviation programs, would all help eliminate the extent of complications of pregnancy. Measures required to enhance infant survival include improved prenatal care, prenatal tetanus toxoid immunization, use of sterile disposable cord care kits, the provision of mucus extractors and resuscitation materials to birth attendants, the creation of neonatal care units in health facilities, and more efficient referral of high-risk newborns and mothers. Since 90% of births in rural India take place at home priority must be given to training traditional birth attendants in the identification of high risk factors during pregnancy, delivery, and the newborn period.

  13. Water supply planning under interdependence of actions: Theory and application

    NASA Astrophysics Data System (ADS)

    Rajabi, S.; Hipel, K. W.; Kilgour, D. M.

    1999-07-01

    An ongoing water supply planning problem in the Regional Municipality of Waterloo, Ontario, Canada, is studied to select the best water supply combination, within a multiple-objective framework, when actions are interdependent. The interdependencies in the problem are described and shown to be essential features. The problem is formulated as a multiple-criteria integer program with interdependent actions. Because of the large number of potential actions and the nonconvexity of the decision space, it is quite difficult to find nondominated subsets of actions. Instead, a modified goal programming technique is suggested to identify promising subsets. The appropriateness of this technique is explained, and the lessons learned in applying it to the Waterloo water supply planning problem are described.

  14. 300-FF-1 remedial design report/remedial action work plan

    SciTech Connect

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  15. Preparing US community greenhouse gas inventories for climate action plans

    NASA Astrophysics Data System (ADS)

    Blackhurst, Michael; Matthews, H. Scott; Sharrard, Aurora L.; Hendrickson, Chris T.; Lima Azevedo, Inês

    2011-07-01

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  16. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    SciTech Connect

    T. M. Fitzmaurice

    2000-08-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

  17. Subtitle D: Groundwater monitoring and corrective action requirements

    SciTech Connect

    Ward, C.G.; McDaniel, L. )

    1993-05-01

    The newly promulgated Subtitle D landfill regulations (40 CFR 258) require landfill owners and operators to adhere to certain design or performance standards for the location, design, operation, and closure of municipal solid waste landfill facilities. Here the authors address the groundwater monitoring requirements and corrective action requirements of those regulations. The section of the regulations addressing groundwater monitoring and corrective action, Subpart E, is the most comprehensive section of the regulations. As with other parts of the regulations, Subpart E also contains inherent flexibility. This article addresses the following sections of Subpart E: Compliance Schedules Exemptions, Groundwater Monitoring Systems, Sampling and Analysis, Detection Monitoring, Assessment Monitoring, and Corrective Action.

  18. Developing a vision and strategic action plan for future community-based residency training.

    PubMed

    Skelton, Jann B; Owen, James A

    2016-01-01

    The Community Pharmacy Residency Program (CPRP) Planning Committee convened to develop a vision and a strategic action plan for the advancement of community pharmacy residency training. Aligned with the profession's efforts to achieve provider status and expand access to care, the Future Vision and Action Plan for Community-based Residency Training will provide guidance, direction, and a strategic action plan for community-based residency training to ensure that the future needs of community-based pharmacist practitioners are met. National thought leaders, selected because of their leadership in pharmacy practice, academia, and residency training, served on the planning committee. The committee conducted a series of conference calls and an in-person strategic planning meeting held on January 13-14, 2015. Outcomes from the discussions were supplemented with related information from the literature. Results of a survey of CPRP directors and preceptors also informed the planning process. The vision and strategic action plan for community-based residency training is intended to advance training to meet the emerging needs of patients in communities that are served by the pharmacy profession. The group anticipated the advanced skills required of pharmacists serving as community-based pharmacist practitioners and the likely education, training and competencies required by future residency graduates in order to deliver these services. The vision reflects a transformation of community residency training, from CPRPs to community-based residency training, and embodies the concept that residency training should be primarily focused on training the individual pharmacist practitioner based on the needs of patients served within the community, and not on the physical location where pharmacy services are provided. The development of a vision statement, core values statements, and strategic action plan will provide support, guidance, and direction to the profession of pharmacy to

  19. Predicting Changes in Physical Activity among Adolescents: The Role of Self-Efficacy, Intention, Action Planning and Coping Planning

    ERIC Educational Resources Information Center

    Araujo-Soares, Vera; McIntyre, Teresa; Sniehotta, Falko F.

    2009-01-01

    This paper aims to test the direct predictors of the theory of planned behaviour (TPB), action planning and coping planning as predictors of changes in physical activity (PA) in 157 adolescents (mean age: 12). TPB measures, the Action Planning and Coping Planning Scales (APCPS) and the International Physical Activity Questionnaires were measured…

  20. Predicting Changes in Physical Activity among Adolescents: The Role of Self-Efficacy, Intention, Action Planning and Coping Planning

    ERIC Educational Resources Information Center

    Araujo-Soares, Vera; McIntyre, Teresa; Sniehotta, Falko F.

    2009-01-01

    This paper aims to test the direct predictors of the theory of planned behaviour (TPB), action planning and coping planning as predictors of changes in physical activity (PA) in 157 adolescents (mean age: 12). TPB measures, the Action Planning and Coping Planning Scales (APCPS) and the International Physical Activity Questionnaires were measured…

  1. Differentiation between deviant trajectory planning, action planning, and reduced psychomotor speed in schizophrenia.

    PubMed

    Houthoofd, Sofie; Morrens, Manuel; Hulstijn, Wouter; Sabbe, Bernard

    2013-07-01

    Abnormal psychomotor behaviour in schizophrenia might be based on separate deficits. Here we studied the relationship between trajectory planning, action planning, psychomotor speed, and indices of cognitive functioning in a large group of stabilised patients with schizophrenia. Sixty-one patients and 30 controls were tested. Trajectory planning was assessed in a graphic task in which sequences of single lines, gradually changing in direction, had to be drawn. Shifts to a comfortable drawing direction reflect anticipatory trajectory planning. Action planning was evaluated in a task in which figures varying in complexity and familiarity had to be copied. Psychomotor speed was measured by use of a simple line copying task. Measures of information processing speed, attention, working memory, and problem solving were derived from neuropsychological tests. Patients much more often opted for the unusual bottom-to-top direction to draw the vertical lines in the drawing task. They changed the line orientation less often than the controls did. In the patient group, these trajectory planning indices did not correlate with measures of action planning, psychomotor speed, or neuropsychological test scores. Deviant trajectory planning strongly characterises schizophrenia, and is independent from action planning deficits and reduced psychomotor speed.

  2. The role of immediate and final goals in action planning: an fMRI study.

    PubMed

    Majdandzić, Jasminka; Grol, Meike J; van Schie, Hein T; Verhagen, Lennart; Toni, Ivan; Bekkering, Harold

    2007-08-15

    To interact effectively with our environment, we need to specify the intended outcomes (goals) of our actions. In this process, immediate goals and final goals can be regarded as different levels within a hierarchically organized system for action planning: immediate goals and movement details are selected to accomplish more remote goals. Behavioral studies support this notion of different levels of action planning, but the neurophysiological basis remains unclear. Using fMRI, we examined the neural correlates of preparing object manipulations based on either the desired end-state (the final goal) or the initial movement towards a target (the immediate goal). Subjects had to insert an object (consisting of a large and a small cube) into one of two corresponding large and small slots. The subjects were cued on either which slot to fill (Final Goal trials) or which object part to grasp (Immediate Goal trials). These actions required similar movements, but different planning. During Final Goal trials, there was differential preparatory activity along the superior frontal gyrus (bilaterally) and in left inferior parietal cortex. Immediate Goal trials evoked differential activity in occipito-parietal and occipito-temporal cortex. These findings support the notion that actions can be planned at different levels. We show that different fronto-parietal circuits plan the same action, by a relative emphasis on either selecting a sequence of movements to achieve a desired end-state, or selecting movements spatially compatible with given object properties.

  3. Low Energy Demonstration Accelerator mitigation action plan annual report for 1998

    SciTech Connect

    Tomei, T.; Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Low Energy Demonstration Accelerator Facility (LEDA) Mitigation Action Plan (MAP). This MAPAR primarily provides a status on specific LEDA facility construction- and operations-related mitigation actions that have been implemented during 1998. The mitigation actions are implemented in order to comply with regulatory requirements under the National Environmental Policy Act (NEPA) by fulfilling DOE`s commitments under the LEDA MAP. This report contains the following three main sections: Introduction; LEDA MAP scope, schedule and status; and Summary and Recommendations. The Introduction section provides a background regarding the origin and purpose of the LEDA MAP. The LEDA MAP scope, schedule, and status section provides a more detailed description of each mitigation action commitment and the current status of each associated action plan. Finally, the Summary and Recommendations section provides DOE`s recommendation regarding future implementation based on the status of each commitment action plan.

  4. Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0

    SciTech Connect

    Susan Evans

    2004-11-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release

  5. 46 CFR 71.65-20 - Number of plans required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 3 2012-10-01 2012-10-01 false Number of plans required. 71.65-20 Section 71.65-20... CERTIFICATION Plan Approval § 71.65-20 Number of plans required. (a) Three copies of each plan are normally..., a suitable number should be submitted to permit the desired distribution. (b) ...

  6. 46 CFR 71.65-20 - Number of plans required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 3 2013-10-01 2013-10-01 false Number of plans required. 71.65-20 Section 71.65-20... CERTIFICATION Plan Approval § 71.65-20 Number of plans required. (a) Three copies of each plan are normally..., a suitable number should be submitted to permit the desired distribution. (b) ...

  7. 46 CFR 71.65-20 - Number of plans required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 3 2014-10-01 2014-10-01 false Number of plans required. 71.65-20 Section 71.65-20... CERTIFICATION Plan Approval § 71.65-20 Number of plans required. (a) Three copies of each plan are normally..., a suitable number should be submitted to permit the desired distribution. (b) ...

  8. 40 CFR 51.230 - Requirements for all plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Requirements for all plans. 51.230 Section 51.230 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Requirements for all plans. Each plan must show that the State has legal authority to carry out the plan...

  9. 46 CFR 71.65-20 - Number of plans required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Number of plans required. 71.65-20 Section 71.65-20... CERTIFICATION Plan Approval § 71.65-20 Number of plans required. (a) Three copies of each plan are normally..., a suitable number should be submitted to permit the desired distribution. (b) ...

  10. 42 CFR 433.53 - State plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Financial Participation § 433.53 State plan requirements. A State plan must provide that— (a) State (as... 42 Public Health 4 2010-10-01 2010-10-01 false State plan requirements. 433.53 Section 433.53... will be used to pay at least 40 percent of the non-Federal share of total expenditures under the plan...

  11. 25 CFR 166.312 - Is a conservation plan required?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Is a conservation plan required? 166.312 Section 166.312... Operations Management Management Plans and Environmental Compliance § 166.312 Is a conservation plan required? A conservation plan must be developed for each permit with the permittee and approved by us prior...

  12. 25 CFR 166.312 - Is a conservation plan required?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Is a conservation plan required? 166.312 Section 166.312... Operations Management Management Plans and Environmental Compliance § 166.312 Is a conservation plan required? A conservation plan must be developed for each permit with the permittee and approved by us prior...

  13. 25 CFR 166.312 - Is a conservation plan required?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Is a conservation plan required? 166.312 Section 166.312... Operations Management Management Plans and Environmental Compliance § 166.312 Is a conservation plan required? A conservation plan must be developed for each permit with the permittee and approved by us prior...

  14. 25 CFR 166.312 - Is a conservation plan required?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Is a conservation plan required? 166.312 Section 166.312... Operations Management Management Plans and Environmental Compliance § 166.312 Is a conservation plan required? A conservation plan must be developed for each permit with the permittee and approved by us prior...

  15. 25 CFR 166.312 - Is a conservation plan required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Is a conservation plan required? 166.312 Section 166.312... Operations Management Management Plans and Environmental Compliance § 166.312 Is a conservation plan required? A conservation plan must be developed for each permit with the permittee and approved by us prior...

  16. National Action Plan for the Prevention of Playground Injuries.

    ERIC Educational Resources Information Center

    Thompson, Donna; Hudson, Susan

    Recognizing the need for a nationally coordinated effort to reduce playground injuries, the National Program for Playground Safety was created in 1995. This booklet describes the national action plan for prevention of playground injuries. Designed for use by parents, teachers, recreation and park personnel, and caregivers involved in providing…

  17. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... continuation of generation of electric power at the project during or following an accident or other incident... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY...

  18. Long-Chain Perfluorinated Chemicals (PFCs) Action Plan

    EPA Pesticide Factsheets

    This Action Plan is based on EPA’s initial review of readily available use, exposure, and hazard information on PFCs. EPA considered which of the various authorities provided under TSCA and other statutes might be appropriate to address potential concerns.

  19. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  20. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  1. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  2. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  3. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency... route assignments; (ii) Procedures to be followed by employees who remain to operate critical plant... area. (4) Evacuation. The employer shall establish the types of evacuation to be used in...

  4. Creating a Global Agenda: Assessments, Solutions, and Action Plans.

    ERIC Educational Resources Information Center

    Didsbury, Howard F., Jr., Ed.

    Designed for educational policymakers and researchers, this volume on global issues is divided into four sections. The four essays in the first section, "Reducing the Nuclear Peril," offer a brief documentary survey and then present practical suggestions and action plans to reduce the nuclear threat. The eight papers in the second…

  5. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex, or...

  6. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex, or...

  7. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex, or...

  8. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex, or...

  9. Noise action plan of agglomerations: sustainable hypothesis or utopy?

    PubMed

    Magri, S L; Masera, S; Fogola, J

    2009-12-01

    European and Italian laws establish that agglomerations of more than 100 000 inhabitants must adopt an action plan in order to manage noise issues and effects. The plan aim is to reduce population exposure to environmental noise, which is defined as the outdoor sound created by human activities, including noise emitted by road traffic, rail traffic and air traffic, and noise from sites of industrial activity. Although acoustic pollution represents one of the main causes of annoyance for inhabitants of urban areas, the political agenda does not acknowledge it among the main environmental issues. Thus, acoustic reclamation is often considered a duty to be accomplished rather than a way to improve quality of life for citizens. Furthermore, financial resources are generally very poor while the acoustic critical situations are numerous and serious in terms of exceeding the limit. In this situation, what is the meaning of an urban area noise action plan? What are the concrete actions that municipalities can realise to reduce urban noise pollution? This study tries to answer these questions, starting from the analysis carried out for the action plan of the city of Turin.

  10. 29 CFR 1926.35 - Employee emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Employee emergency action plans. 1926.35 Section 1926.35 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION General Safety and Health...

  11. 29 CFR 1926.35 - Employee emergency action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Employee emergency action plans. 1926.35 Section 1926.35 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION General Safety and Health...

  12. 29 CFR 1926.35 - Employee emergency action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Employee emergency action plans. 1926.35 Section 1926.35 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION General Safety and Health...

  13. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income... regulatory agreement, which may include a request for incentives to extend the low income use of the housing... proposed changes in the low income affordability restrictions; (4) A description of any proposed changes...

  14. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100...

  15. State Action Plan for Iowa. "Marketing" Marketing Education.

    ERIC Educational Resources Information Center

    Omega Group, Inc., Haverford, PA.

    An Iowa project identified curriculum, program standards, and a framework for promoting marketing education programs. The mission for the state action plan for marketing education is to develop a strategy to revitalize Iowa's marketing education for the 21st century. Three goals support this mission: (1) create a community-wide awareness of the…

  16. State Action Plan for Iowa. "Marketing" Marketing Education.

    ERIC Educational Resources Information Center

    Omega Group, Inc., Haverford, PA.

    An Iowa project identified curriculum, program standards, and a framework for promoting marketing education programs. The mission for the state action plan for marketing education is to develop a strategy to revitalize Iowa's marketing education for the 21st century. Three goals support this mission: (1) create a community-wide awareness of the…

  17. Guide for Planning a High School Environmental Action Conference.

    ERIC Educational Resources Information Center

    Wanless, Angie, Comp.; And Others

    The purpose of this manual is to provide guidelines and suggestions for people organizing an environmental action conference for high school students. The format and planning suggestions are based on the methods used for a conference organized by the Wisconsin Center for Environmental Education in 1991. The bulk of the manual provides structure…

  18. U.S. Draft Domestic Action Plan for Lake Erie

    EPA Pesticide Factsheets

    In 2016, in response to the 2012 Great Lakes Water Quality Agreement commitments, Canada and the U.S. adopted phosphorus reduction targets for Lake Erie. Each country is developing domestic action plans which outline strategies for meeting the new targets.

  19. Creating a Global Agenda: Assessments, Solutions, and Action Plans.

    ERIC Educational Resources Information Center

    Didsbury, Howard F., Jr., Ed.

    Designed for educational policymakers and researchers, this volume on global issues is divided into four sections. The four essays in the first section, "Reducing the Nuclear Peril," offer a brief documentary survey and then present practical suggestions and action plans to reduce the nuclear threat. The eight papers in the second…

  20. 24 CFR 248.135 - Plans of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., including the identity of the transferee and a copy of any documents of sale; (5) An income profile of the... median income limits established by the Commissioner in February 1987), or if the January 1, 1987 profile... OF LOW INCOME HOUSING MORTGAGES Prepayments and Plans of Action Under the Low Income...

  1. 33 CFR 230.6 - Actions normally requiring an EIS.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Actions normally requiring an EIS. 230.6 Section 230.6 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY... consider the use of an environmental assessment (EA) on these types of actions if early studies and...

  2. 33 CFR 230.6 - Actions normally requiring an EIS.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Actions normally requiring an EIS. 230.6 Section 230.6 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY... consider the use of an environmental assessment (EA) on these types of actions if early studies and...

  3. 33 CFR 230.6 - Actions normally requiring an EIS.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... normally requiring an EIS are: (a) Feasibility reports for authorization and construction of major projects... consider the use of an environmental assessment (EA) on these types of actions if early studies and coordination show that a particular action is not likely to have a significant impact on the quality of the...

  4. 33 CFR 230.6 - Actions normally requiring an EIS.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... normally requiring an EIS are: (a) Feasibility reports for authorization and construction of major projects... consider the use of an environmental assessment (EA) on these types of actions if early studies and coordination show that a particular action is not likely to have a significant impact on the quality of the...

  5. 32 CFR 651.42 - Actions normally requiring an EIS.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Actions normally requiring an EIS. 651.42 Section 651.42 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.42...

  6. 32 CFR 651.42 - Actions normally requiring an EIS.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Actions normally requiring an EIS. 651.42 Section 651.42 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.42...

  7. 32 CFR 651.42 - Actions normally requiring an EIS.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Actions normally requiring an EIS. 651.42 Section 651.42 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.42...

  8. 32 CFR 651.42 - Actions normally requiring an EIS.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Actions normally requiring an EIS. 651.42 Section 651.42 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement §...

  9. A national action plan for workforce development in behavioral health.

    PubMed

    Hoge, Michael A; Morris, John A; Stuart, Gail W; Huey, Leighton Y; Bergeson, Sue; Flaherty, Michael T; Morgan, Oscar; Peterson, Janice; Daniels, Allen S; Paris, Manuel; Madenwald, Kappy

    2009-07-01

    Across all sectors of the behavioral health field there has been growing concern about a workforce crisis. Difficulties encompass the recruitment and retention of staff and the delivery of accessible and effective training in both initial, preservice training and continuing education settings. Concern about the crisis led to a multiphased, cross-sector collaboration known as the Annapolis Coalition on the Behavioral Health Workforce. With support from the Substance Abuse and Mental Health Services Administration, this public-private partnership crafted An Action Plan for Behavioral Health Workforce Development. Created with input from a dozen expert panels, the action plan outlines seven core strategic goals that are relevant to all sectors of the behavioral health field: expand the role of consumers and their families in the workforce, expand the role of communities in promoting behavioral health and wellness, use systematic recruitment and retention strategies, improve training and education, foster leadership development, enhance infrastructure to support workforce development, and implement a national research and evaluation agenda. Detailed implementation tables identify the action steps for diverse groups and organizations to take in order to achieve these goals. The action plan serves as a call to action and is being used to guide workforce initiatives across the nation.

  10. Corrective action investigation plan for Corrective Action Unit 340, Pesticide Release Sites, Nevada Test Site, Nye County, Nevada

    SciTech Connect

    1998-01-01

    This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to the FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.

  11. 42 CFR 431.702 - State plan requirement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Licensing Nursing Home Administrators § 431.702 State plan requirement. A State plan must provide that the State has a program for licensing administrators of nursing homes that meets the requirements of §§ 431...

  12. 42 CFR 431.702 - State plan requirement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Licensing Nursing Home Administrators § 431.702 State plan requirement. A State plan must provide that the State has a program for licensing administrators of nursing homes that meets the requirements of §§ 431...

  13. 42 CFR 431.702 - State plan requirement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Licensing Nursing Home Administrators § 431.702 State plan requirement. A State plan must provide that the State has a program for licensing administrators of nursing homes that meets the requirements of §§ 431...

  14. Auditory event files: integrating auditory perception and action planning.

    PubMed

    Zmigrod, Sharon; Hommel, Bernhard

    2009-02-01

    The features of perceived objects are processed in distinct neural pathways, which call for mechanisms that integrate the distributed information into coherent representations (the binding problem). Recent studies of sequential effects have demonstrated feature binding not only in perception, but also across (visual) perception and action planning. We investigated whether comparable effects can be obtained in and across auditory perception and action. The results from two experiments revealed effects indicative of spontaneous integration of auditory features (pitch and loudness, pitch and location), as well as evidence for audio-manual stimulus-response integration. Even though integration takes place spontaneously, features related to task-relevant stimulus or response dimensions are more likely to be integrated. Moreover, integration seems to follow a temporal overlap principle, with features coded close in time being more likely to be bound together. Taken altogether, the findings are consistent with the idea of episodic event files integrating perception and action plans.

  15. The Application of NEPA Requirements to CERCLA Remedial Actions

    DTIC Science & Technology

    1994-06-01

    into CERCLA Documents. Office of Enforcement. Washington, D.C., January 1991. United States Environmental Protection Agency. Compendium of Superfund ...AD-A284 803 , .-DTIC ’-9,-’ THE APPLICATION OF NEPA REQUIREMENTS TO CERCLA REMEDIAL ACTIONS THES IS Connie L. Strobbe AFIT/GEE/ENV/94S-28 DEPARTMENT...APPLICATION OF NEPA REQUIREMENTS TO CERCLA REMEDIAL ACTIONS THESIS Connie L. Strobbe AFIT/GEE/ENV/94S-28 \\’•94-30610 Approved for public release; distribution

  16. 29 CFR Appendix to Subpart E of... - Exit Routes, Emergency Action Plans, and Fire Prevention Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 5 2011-07-01 2011-07-01 false Exit Routes, Emergency Action Plans, and Fire Prevention..., and Fire Prevention Plans This appendix serves as a nonmandatory guideline to assist employers in.... Fire prevention housekeeping. The standard calls for the control of accumulations of flammable...

  17. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 322: AREAS 1 AND 3 RELEASE SITES AND INJECTION WELLS, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2005-09-01

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CADD. From April 2004 through September 2004, CAU 322 site characterization activities were conducted. CAU 322 consists of three CASs located in Areas 1 and 3 of the NTS.

  18. 77 FR 38199 - Determining Conformity of Federal Actions to State or Federal Implementation Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 93 Determining Conformity of Federal Actions to State or Federal Implementation Plans... conformity purposes, the budget(s) shall not be used to satisfy the requirements of this section....

  19. 18 CFR 707.8 - Typical classes of action requiring similar treatment under NEPA.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... changes) in principles, standards, and procedures for planning water and related land resources. (ii... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Typical classes of action requiring similar treatment under NEPA. 707.8 Section 707.8 Conservation of Power and...

  20. 14 CFR 158.19 - Requirement for competition plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Requirement for competition plans. 158.19... (CONTINUED) AIRPORTS PASSENGER FACILITY CHARGES (PFC'S) General § 158.19 Requirement for competition plans... airport unless the public agency has submitted a written competition plan. This requirement does not apply...

  1. 42 CFR 455.12 - State plan requirement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Investigation Program § 455.12 State plan requirement. A State plan must meet the requirements of §§ 455.13... 42 Public Health 4 2011-10-01 2011-10-01 false State plan requirement. 455.12 Section 455.12 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN...

  2. 42 CFR 455.12 - State plan requirement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Investigation Program § 455.12 State plan requirement. A State plan must meet the requirements of §§ 455.13... 42 Public Health 4 2010-10-01 2010-10-01 false State plan requirement. 455.12 Section 455.12 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN...

  3. 49 CFR 238.603 - Safety planning requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Safety planning requirements. 238.603 Section 238... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER EQUIPMENT SAFETY STANDARDS Specific Safety Planning Requirements for Tier II Passenger Equipment § 238.603 Safety planning requirements. (a) Prior to commencing...

  4. 49 CFR 238.603 - Safety planning requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Safety planning requirements. 238.603 Section 238... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER EQUIPMENT SAFETY STANDARDS Specific Safety Planning Requirements for Tier II Passenger Equipment § 238.603 Safety planning requirements. (a) Prior to commencing...

  5. 49 CFR 238.603 - Safety planning requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Safety planning requirements. 238.603 Section 238... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER EQUIPMENT SAFETY STANDARDS Specific Safety Planning Requirements for Tier II Passenger Equipment § 238.603 Safety planning requirements. (a) Prior to commencing...

  6. 49 CFR 659.21 - System security plan: general requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false System security plan: general requirements. 659.21... State Oversight Agency § 659.21 System security plan: general requirements. (a) The oversight agency shall require the rail transit agency to implement a system security plan that, at a minimum,...

  7. 49 CFR 659.21 - System security plan: general requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: general requirements. 659.21... State Oversight Agency § 659.21 System security plan: general requirements. (a) The oversight agency shall require the rail transit agency to implement a system security plan that, at a minimum,...

  8. 14 CFR 158.19 - Requirement for competition plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Requirement for competition plans. 158.19... (CONTINUED) AIRPORTS PASSENGER FACILITY CHARGES (PFC'S) General § 158.19 Requirement for competition plans... airport unless the public agency has submitted a written competition plan. This requirement does not...

  9. 14 CFR 158.19 - Requirement for competition plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Requirement for competition plans. 158.19... (CONTINUED) AIRPORTS PASSENGER FACILITY CHARGES (PFC'S) General § 158.19 Requirement for competition plans... airport unless the public agency has submitted a written competition plan. This requirement does not...

  10. 14 CFR 158.19 - Requirement for competition plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Requirement for competition plans. 158.19... (CONTINUED) AIRPORTS PASSENGER FACILITY CHARGES (PFC'S) General § 158.19 Requirement for competition plans... airport unless the public agency has submitted a written competition plan. This requirement does not...

  11. 49 CFR 238.603 - Safety planning requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Safety planning requirements. 238.603 Section 238... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER EQUIPMENT SAFETY STANDARDS Specific Safety Planning Requirements for Tier II Passenger Equipment § 238.603 Safety planning requirements. (a) Prior to...

  12. 14 CFR 158.19 - Requirement for competition plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Requirement for competition plans. 158.19... (CONTINUED) AIRPORTS PASSENGER FACILITY CHARGES (PFC'S) General § 158.19 Requirement for competition plans... airport unless the public agency has submitted a written competition plan. This requirement does not...

  13. Documentation of a Model Action Plan to Deter Illicit Nuclear Trafficking

    SciTech Connect

    Smith, D; Kristo, M; Niemeyer, S; Dudder, G

    2006-07-28

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures.

  14. Documentation of a model action plan to deter illicit nuclear trafficking

    SciTech Connect

    Smith, D. K.; Kristo, M. J.; Niemeyer, S.; Dudder, Gordon B.

    2008-05-04

    Theft, illegal possession, smuggling, or attempted unathorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures.

  15. Environmental Restoration Remedial Action Quality Assurance Requirements Document

    SciTech Connect

    Cote, R.F.

    1991-09-01

    The Environmental Restoration Remedial Action Quality Assurance Requirements Document defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency. 18 refs.

  16. 77 FR 38296 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... Detection, Prevention, and Management of Infertility (77 FR 28883). Written and electronic comments were to..., and Management of Infertility, Docket No. CDC- 2012-0004, 4770 Buford Highway NE., Mailstop...

  17. Subtitle D: Groundwater monitoring and corrective action requirements

    SciTech Connect

    Ward, C.G.; McDaniel, L. )

    1993-01-01

    The newly promulgated Subtitle-D landfill regulations (40 CFR 258) require that landfill owners and operators adhere to certain design or performance standards for the location, design, operation and closure of municipal solid waste landfill facilities. This paper addresses the groundwater monitoring requirements and corrective action requirements of those regulations. The section of the regulations addressing groundwater monitoring and corrective action, Subpart-E, is the most comprehensive section of the regulations. As with other parts of the regulation, Subpart-E also contains inherent flexibility. This paper addresses the compliance schedules, exemptions to Subpart-E, and groundwater monitoring systems which include: background determination, multi-unit systems, hydrogeologic investigations, and monitoring well installation. The paper further addresses sampling and analysis requirements for detection and assessment monitoring, and the requirements for corrective action such as remedy assessment, selection, and implementation.

  18. Observing end-state comfort favorable actions does not modulate action plan recall

    PubMed Central

    Seegelke, Christian

    2015-01-01

    A large corpus of work demonstrates that observing other people’s actions activates corresponding motor representations in the observer by running an internal simulation of the observed action. Recent evidence suggests that recalled action plans reflect a plan of how the observer would execute that action (based on the specific motor representation) rather than a plan of the actually observed action (based on the visual representation). This study examined whether people would recall an action plan based on a visual representation if the observed movement is biomechanically favorable for their own subsequent action. Participants performed an object manipulation task alongside a confederate. In the intra-individual task, the participant (or confederate) transported a plunger from an outer platform of fixed height to a center target platform located at different heights (home-to-target move), and then the same person transported the plunger back to the outer platform (target-back-to-home move). In the inter-individual task, the sequence was split between the two persons such that the participant (or confederate) performed the home-to-target move and the other person performed the target-back-to-home move. Importantly, the confederate always grasped the plunger at the same height. This grasp height was designated such that if participants would copy the action (i.e., grasp the object at the same height) it would place the participant’s arm in a comfortable position at the end of the target-back-to-home move (i.e., end-state comfort). Results show that participants’ grasp height was inversely related to center target height and similar regardless of direction (home-to-target vs. target-back-to-home move) and task (intra- vs. inter-individual). In addition, during the inter-individual task, participant’s target-back-to-home grasp height was correlated with their own, but not with the confederate’s grasp height during the home-to-target moves. These findings

  19. Observing end-state comfort favorable actions does not modulate action plan recall.

    PubMed

    Seegelke, Christian

    2015-01-01

    A large corpus of work demonstrates that observing other people's actions activates corresponding motor representations in the observer by running an internal simulation of the observed action. Recent evidence suggests that recalled action plans reflect a plan of how the observer would execute that action (based on the specific motor representation) rather than a plan of the actually observed action (based on the visual representation). This study examined whether people would recall an action plan based on a visual representation if the observed movement is biomechanically favorable for their own subsequent action. Participants performed an object manipulation task alongside a confederate. In the intra-individual task, the participant (or confederate) transported a plunger from an outer platform of fixed height to a center target platform located at different heights (home-to-target move), and then the same person transported the plunger back to the outer platform (target-back-to-home move). In the inter-individual task, the sequence was split between the two persons such that the participant (or confederate) performed the home-to-target move and the other person performed the target-back-to-home move. Importantly, the confederate always grasped the plunger at the same height. This grasp height was designated such that if participants would copy the action (i.e., grasp the object at the same height) it would place the participant's arm in a comfortable position at the end of the target-back-to-home move (i.e., end-state comfort). Results show that participants' grasp height was inversely related to center target height and similar regardless of direction (home-to-target vs. target-back-to-home move) and task (intra- vs. inter-individual). In addition, during the inter-individual task, participant's target-back-to-home grasp height was correlated with their own, but not with the confederate's grasp height during the home-to-target moves. These findings provide

  20. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    SciTech Connect

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action.

  1. The Newcastle (Australia) Airshed Management Action Plan (NAMAP)

    SciTech Connect

    Bridgman, H.A.; Cameron, C.

    1999-07-01

    The Newcastle (NSW Australia) Airshed Management Action Plan (NAMAP) has recently been completed, and is a forerunner toward urban air pollution management in Australia. NAMAP was developed by the Newcastle City Council in partnership with the community, science, and industry, as part of Council's commitments in it's environmental plan. Its purpose is to provide action strategies which will lead to improvements in Newcastle's air quality for future generations. Key issues addressed in the plan include: minimizing industrial emissions; reducing growth of vehicle kilometers traveled; improving energy efficiency; managing air quality from small and medium enterprises; reducing the impacts of solid fuel burning; improving management from councils own activities; making motor vehicle run clean; reviewing performance; and developing better solutions. Management strategies include community education, land use planning, regulation, economic incentives, monitoring, performance indicators and reporting. This paper describes the structure and development of NAMAP through stages from understanding the air pollution problem to recommending of action strategies for reduction and control. The development and implementation of NAMAP is particularly important as major changes in Newcastle's heavy industrial base will occur in the future, creating a restructuring in the relative importance of sources and primary emissions. NAMAP provides an excellent example of a cooperative effort to minimize air pollution problems in a small city.

  2. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  3. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  4. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  5. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  6. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  7. An investigation into the relevance of action planning, theory of planned behaviour concepts, and automaticity for fruit intake action control.

    PubMed

    de Bruijn, Gert-Jan; Wiedemann, Amelie; Rhodes, Ryan E

    2014-09-01

    In the action control framework, intention-behaviour discordance is studied around public health guidelines. Although this framework has been applied to physical activity behaviours, it has only seen very limited attention regarding fruit intake. The purpose of this study was therefore to investigate distributions and predictors of fruit intake intention-behaviour discordance. Prospective correlational design. Data were obtained from undergraduate students (n = 413) using validated questionnaires. Variables from the theory of planned behaviour, automaticity, and action planning were assessed at baseline, and fruit intake was assessed 2 weeks later. Data were analysed using discriminant function analyses and analyses of variance. The proportion of unsuccessful intenders ranged from 39.2% to 80.8%. There was a larger proportion of fruit intake intenders amongst those who reported strong automatic fruit intake. Action control was predicted by fruit intake automaticity and affective attitudes, but the strongest predictor was perceived behavioural control. No action planning items were related to fruit intake action control. There is considerable asymmetry in the intention-fruit intake relationship. An application of the action control framework may stimulate debate on the applicability of intention-based models at the public health level. What is already known on this subject? Intention is theorized to be a key construct in fruit intake. Studies in the physical activity domain indicate that nearly half of the people with positive intentions fail to subsequently act. What does this study add? The proportion of unsuccessful intenders ranged from 39.2% to 80.8%. Holding positive intentions is not sufficient to consume fruit at suggested public health guidelines. Perceived behavioural control is the most important predictor of fruit intake action control. © 2013 The British Psychological Society.

  8. 49 CFR 234.11 - State highway-rail grade crossing action plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false State highway-rail grade crossing action plans..., STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway...

  9. 49 CFR 234.11 - State highway-rail grade crossing action plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false State highway-rail grade crossing action plans..., STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway...

  10. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons Nevada Test Site, Nevada

    SciTech Connect

    DOE /NV Operations Office

    1999-05-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and criteria for conducting site investigation activities at CAU 232, Area 25 Sewage Lagoons. Corrective Action Unit 232 consists of CAS 25-03-01, Sewage Lagoon, located in Area 25 of the Nevada Test Site (NTS). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Area 25 Sewage Lagoons (Figure 1-2) (IT, 1999b) are located approximately 0.3 mi south of the Test Cell 'C' (TCC) Facility and were used for the discharge of sanitary effluent from the TCC facility. For purposes of this discussion, this site will be referred to as either CAU 232 or the sewage lagoons.

  11. Corrective Action Investigation Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada

    SciTech Connect

    DOE /NV

    1999-01-25

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 240, Area 25 Vehicle Washdown, which is located on the Nevada Test Site (NTS).

  12. Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks Nevada Test Site, Nevada

    SciTech Connect

    U.S. Department of Energy, Nevada Operations Office

    1999-05-05

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 135, Area 25 Underground Storage Tanks (USTs), which is located on the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada.

  13. Buried Waste Integrated Demonstration commercialization actions plans. Volume 1

    SciTech Connect

    Kaupanger, R.M.; Glore, D.

    1994-04-01

    The Buried Waste Integrated Demonstration (BWID) is sponsored by US Department of Energy (DOE) Office of Technology Development. BWID supports the development and demonstration of a suite of technologies that when integrated with commercially available baseline technologies form a comprehensive system for the effective and efficient remediation of buried waste throughout the DOE complex. BWID evaluates, validates, and demonstrates technologies and transfers this information throughout DOE and private industry to support DOE. remediation planning and implementation activities. This report documents commercialization action plans for five technologies with near-term commercialization/ implementation potential as well as provides a status of commercial and academic partners for each technology.

  14. Commonwealth of the Northern Mariana Islands Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  15. Planning and Estimation of Operations Support Requirements

    NASA Technical Reports Server (NTRS)

    Newhouse, Marilyn E.; Barley, Bryan; Bacskay, Allen; Clardy, Dennon

    2010-01-01

    Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D

  16. On the importance of being first: serial order effects in the interaction between action plans and ongoing actions.

    PubMed

    Fournier, Lisa R; Gallimore, Jonathan M; Feiszli, Kevin R; Logan, Gordon D

    2014-02-01

    When we plan sequences of actions, we must hold some elements of the sequence in working memory (WM) while we execute others. Research shows that execution of an action can be delayed if it partly overlaps (vs. does not overlap) with another action plan maintained in WM (partial repetition cost). However, it is not known whether all features of the action maintained in WM interfere equally with current actions. Most serial models of memory and action assume that interference will be equal, because all action features in the sequence should be activated to an equal degree in parallel; others assume that action features earlier in the sequence will interfere more than those later in the sequence, because earlier features will be more active. Using a partial repetition paradigm, this study examined whether serial position of action features in action sequences maintained in WM have an influence on current actions. Two stimulus events occurred in a sequence, and participants planned and maintained an action sequence to the first event (action A) in WM while executing a speeded response to the second event (action B). Results showed delayed execution of action B when it matched the first feature in the action A sequence (partial repetition cost), but not when it matched the last feature. These findings suggest that serial order is represented in the action plan prior to response execution, consistent with models that assume that serial order is represented by a primacy gradient of parallel feature activation prior to action execution.

  17. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    USGS Publications Warehouse

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  18. The National Action Plan. Australian School Science Education National Action Plan, 2008-2012. Volume 1

    ERIC Educational Resources Information Center

    Goodrum, Denis; Rennie, Leonie J.

    2007-01-01

    In 2001, the Australian Government released a report, commissioned by the then Department of Education, Training and Youth Affairs, entitled "The Status and Quality of Teaching and Learning of Science in Australian Schools" (Goodrum, Hackling, & Rennie, 2001). Its recommendations included actions to address raising community…

  19. Plan of Action and Milestones for Navy Combustion Toxicity.

    DTIC Science & Technology

    1981-01-01

    commercial hotel fires have reemphasized the danger of toxic gas generation by combustible materials. Many of these materials are present in U.S. Navy ships...progressive order of planned action. Since the subject matter involves the partici- pation of a number of Naval R&D activities, coordinated mangement ...of death by toxic gases are the MGM Hotel fire in Las j Vegas, Nevada, and the Stouffer’s Hotel fire in New York; over 100 lives were lost in these

  20. Implement balanced scorecard to translate strategic plan into actionable objectives.

    PubMed

    2004-09-01

    Faced with challenges ranging from declining reimbursement to staff shortages, health care organizations--integrated delivery systems, physician group practices, disease management providers, and others--increasingly are turning to general business models to map out step-by-step action plans for performance measurement and process improvement. Creating a "balanced scorecard" is an obvious starting point for assessing and improving clinical and financial performance.

  1. 14 CFR 99.11 - ADIZ flight plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false ADIZ flight plan requirements. 99.11... flight plan requirements. (a) No person may operate an aircraft into, within, or from a departure point within an ADIZ, unless the person files, activates, and closes a flight plan with the appropriate...

  2. 14 CFR 99.11 - ADIZ flight plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false ADIZ flight plan requirements. 99.11... flight plan requirements. (a) No person may operate an aircraft into, within, or from a departure point within an ADIZ, unless the person files, activates, and closes a flight plan with the appropriate...

  3. 14 CFR 99.11 - ADIZ flight plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false ADIZ flight plan requirements. 99.11... flight plan requirements. (a) No person may operate an aircraft into, within, or from a departure point within an ADIZ, unless the person files, activates, and closes a flight plan with the appropriate...

  4. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  5. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  6. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory...

  7. 45 CFR 162.925 - Additional requirements for health plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Additional requirements for health plans. 162.925 Section 162.925 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND... requirements for health plans. (a) General rules. (1) If an entity requests a health plan to conduct...

  8. 42 CFR 447.20 - Provider restrictions: State plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Provider restrictions: State plan requirements. 447... Provisions § 447.20 Provider restrictions: State plan requirements. A State plan must provide for the... in §§ 447.53 through 447.56), the provider furnishing the service to the individual may not seek...

  9. 45 CFR 162.925 - Additional requirements for health plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Additional requirements for health plans. 162.925 Section 162.925 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND... requirements for health plans. (a) General rules. (1) If an entity requests a health plan to conduct a...

  10. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Are range management plans required? 161.203 Section 161... LANDS GRAZING PERMITS General Provisions § 161.203 Are range management plans required? Yes. BIA will... range restoration activities for the Navajo Partitioned Lands. (b) Develop range management plans with...

  11. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Are range management plans required? 161.203 Section 161... LANDS GRAZING PERMITS General Provisions § 161.203 Are range management plans required? Yes. BIA will... range restoration activities for the Navajo Partitioned Lands. (b) Develop range management plans with...

  12. 25 CFR 161.203 - Are range management plans required?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Are range management plans required? 161.203 Section 161... LANDS GRAZING PERMITS General Provisions § 161.203 Are range management plans required? Yes. BIA will... range restoration activities for the Navajo Partitioned Lands. (b) Develop range management plans with...

  13. 42 CFR 441.101 - State plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Medicaid for Individuals Age 65 or Over in Institutions for Mental Diseases § 441.101 State plan requirements. A State plan that includes Medicaid for individuals age 65 or older in institutions for mental... 42 Public Health 4 2011-10-01 2011-10-01 false State plan requirements. 441.101 Section 441.101...

  14. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory protection...

  15. Information architecture: Standards adoption and retirement process service action plan

    SciTech Connect

    1997-03-01

    The purpose of this Service Action Plan is to announce, as well as provide, a high-level outline of a new Departmental process for the adoption and retirement of information technology standards. This process supports the implementation of a Department of Energy (DOE) Information Architecture. This plan was prepared with the Department of Energy information technology standards customers and stakeholders in mind. The process described in this plan will be serviced primarily by staff from the Office of the Deputy Assistant Secretary for Information Management with assistance from designated program and site Information Technology Standards Points of Contact. We welcome any comments regarding this new Departmental process and encourage the proposal of information technology standards for adoption or retirement.

  16. 78 FR 4368 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ...; Requirements for Determining General Conformity of Federal Actions to Applicable State Implementation Plans... of amending the State's prior general conformity rule to incorporate the most recent changes to Federal general conformity requirements established under rules promulgated by the EPA in July of 2006...

  17. 78 FR 4333 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ...; Requirements for Determining General Conformity of Federal Actions to Applicable State Implementation Plans... revision consists of a legislative rule adopted by West Virginia to amend its prior general conformity rule for the purpose of incorporating revisions to Federal general conformity requirements...

  18. 78 FR 73472 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; State Boards Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Maryland; State Boards Requirements AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA... purpose of addressing the State Boards' requirements for all criteria pollutants of the National Ambient...

  19. 33 CFR 154.1220 - Response plan submission requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1220 Response plan submission requirements. (a) The...

  20. 33 CFR 154.1220 - Response plan submission requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1220 Response plan submission requirements. (a) The...

  1. 33 CFR 154.1220 - Response plan submission requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1220 Response plan submission requirements. (a) The...

  2. 33 CFR 154.1220 - Response plan submission requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1220 Response plan submission requirements. (a) The...

  3. 33 CFR 154.1220 - Response plan submission requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SECURITY (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1220 Response plan submission requirements. (a) The...

  4. 42 CFR 441.101 - State plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Medicaid for Individuals Age 65 or Over in Institutions for Mental Diseases § 441.101 State plan requirements. A State plan that includes Medicaid for individuals age 65 or older in institutions for mental...

  5. 42 CFR 441.101 - State plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Medicaid for Individuals Age 65 or Over in Institutions for Mental Diseases § 441.101 State plan requirements. A State plan that includes Medicaid for individuals age 65 or older in institutions for mental...

  6. 42 CFR 442.10 - State plan requirement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) MEDICAL ASSISTANCE PROGRAMS STANDARDS FOR PAYMENT TO NURSING FACILITIES AND INTERMEDIATE CARE FACILITIES FOR THE MENTALLY RETARDED Provider Agreements § 442.10 State plan requirement. A State plan...

  7. Record of Technical Change - Corrective Action Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office; Bechtel Nevada

    2005-04-13

    Record of Technical Change, Technical Change No. CAP-1, dated April 13, 2005 for Corrective Action Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Revision 0, September 2004, DOE/NV--1003.

  8. Watershed planning, implementation and assessment: the May River Watershed Action Plan case study

    Treesearch

    Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie

    2016-01-01

    Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...

  9. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    SciTech Connect

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the Corrective Action Unit No. 426, which includes the Cactus Spring Waste Trenches, located at the Tonopah Test Range. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action. The scope of this investigation will include drilling and collecting subsurface samples from within and below the trenches. Sampling locations will be biased toward the areas most likely to be contaminated. The Cactus Spring Waste Trenches Site is identified as one of three potential locations for buried, radioactively contaminated materials from the Double Tracks Test. This test was the first of four storage-transportation tests conducted in 1963 as part of Operation Roller Coaster. The experiment involved the use of live animals to assess the inhalation intake of a plutonium aerosol.

  10. Workshop on the preparation of climate change action plans. Workshop summary

    SciTech Connect

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  11. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... planning document requirements (HIT PAPD). 495.336 Section 495.336 Public Health CENTERS FOR MEDICARE... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  12. Planning perception and action for cognitive mobile manipulators

    NASA Astrophysics Data System (ADS)

    Gaschler, Andre; Nogina, Svetlana; Petrick, Ronald P. A.; Knoll, Alois

    2013-12-01

    We present a general approach to perception and manipulation planning for cognitive mobile manipulators. Rather than hard-coding single purpose robot applications, a robot should be able to reason about its basic skills in order to solve complex problems autonomously. Humans intuitively solve tasks in real-world scenarios by breaking down abstract problems into smaller sub-tasks and use heuristics based on their previous experience. We apply a similar idea for planning perception and manipulation to cognitive mobile robots. Our approach is based on contingent planning and run-time sensing, integrated in our knowledge of volumes" planning framework, called KVP. Using the general-purpose PKS planner, we model information-gathering actions at plan time that have multiple possible outcomes at run time. As a result, perception and sensing arise as necessary preconditions for manipulation, rather than being hard-coded as tasks themselves. We demonstrate the e ectiveness of our approach on two scenarios covering visual and force sensing on a real mobile manipulator.

  13. Limbic Interference During Social Action Planning in Schizophrenia.

    PubMed

    Stegmayer, Katharina; Bohlhalter, Stephan; Vanbellingen, Tim; Federspiel, Andrea; Wiest, Roland; Müri, René M; Strik, Werner; Walther, Sebastian

    2017-05-30

    Schizophrenia is characterized by social interaction deficits contributing to poor functional outcome. Hand gesture use is particularly impaired, linked to frontal lobe dysfunction and frontal grey matter deficits. The functional neural correlates of impaired gesturing are currently unclear. We therefore investigated aberrant brain activity during impaired gesturing in schizophrenia. We included 22 patients with schizophrenia and 25 healthy control participants matched for age, gender, and education level. We obtained functional magnetic resonance imaging data using an event-related paradigm to assess brain activation during gesture planning and execution. Group differences in whole brain effects were calculated using factorial designs. Gesture ratings were performed by a single rater, blind to diagnoses and clinical presentation. During gesture planning and execution both groups activated brain areas of the praxis network. However, patients had reduced dorsolateral prefrontal cortex (DLPFC) and increased inferior parietal lobe (IPL) activity. Performance accuracy was associated with IPL activity in patients. Furthermore, patients activated temporal poles, amygdala and hippocampus during gesture planning, which was associated with delusion severity. Finally, patients demonstrated increased dorsomedial prefrontal cortex activity during planning of novel gestures. We demonstrate less prefrontal, but more IPL and limbic activity during gesturing in schizophrenia. IPL activity was associated with performance accuracy, whereas limbic activity was linked to delusion severity. These findings may reflect impaired social action planning and a limbic interference with gestures in schizophrenia contributing to poor gesture performance and consequently poor social functioning in schizophrenia. © The Author 2017. Published by Oxford University Press on behalf of the Maryland Psychiatric Research Center.

  14. 33 CFR 154.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements. 154.1125 Section 154.1125 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility Operating in Prince William Sound, Alaska § 154.1125 Additional response plan requirements. (a) The owner or...

  15. 33 CFR 155.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements. 155.1125 Section 155.1125 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act § 155.1125 Additional response plan requirements. (a) The owner...

  16. 14 CFR 152.113 - Application requirements: Airport planning.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Application requirements: Airport planning... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.113 Application requirements: Airport planning. (a) Application for Federal assistance. An eligible...

  17. 14 CFR 152.113 - Application requirements: Airport planning.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Application requirements: Airport planning... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.113 Application requirements: Airport planning. (a) Application for Federal assistance. An eligible...

  18. 14 CFR 152.113 - Application requirements: Airport planning.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Application requirements: Airport planning... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.113 Application requirements: Airport planning. (a) Application for Federal assistance. An eligible...

  19. 14 CFR 152.113 - Application requirements: Airport planning.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Application requirements: Airport planning... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.113 Application requirements: Airport planning. (a) Application for Federal assistance. An eligible...

  20. 75 FR 27927 - Diversification Requirements for Certain Defined Contribution Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... Internal Revenue Service 26 CFR Part 1 RIN 1545-BH04 Diversification Requirements for Certain Defined... to diversification requirements for certain defined contribution plans holding publicly traded... under section 401(a) unless the plan satisfies the diversification requirements of section 401(a)(35)(B...

  1. 14 CFR 91.153 - VFR flight plan: Information required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false VFR flight plan: Information required. 91... (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Flight Rules Visual Flight Rules § 91.153 VFR flight plan: Information required. (a) Information required. Unless otherwise...

  2. 30 CFR 254.5 - General response plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.5 General response plan requirements. (a) The response plan must provide for response to an oil spill from... spill and remove any spills of oil. (d) In addition to the requirements listed in this part, you...

  3. 30 CFR 254.5 - General response plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.5 General response plan requirements. (a) The response plan must provide for response to an oil spill from... spill and remove any spills of oil. (d) In addition to the requirements listed in this part, you...

  4. 30 CFR 254.5 - General response plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.5 General response plan requirements. (a) The response plan must provide for response to an oil spill from... spill and remove any spills of oil. (d) In addition to the requirements listed in this part, you...

  5. 30 CFR 777.14 - Maps and plans: General requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Maps and plans: General requirements. 777.14... REGULATORY PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.14 Maps and plans: General requirements. (a) Maps submitted with applications shall be presented in a consolidated format, to the extent...

  6. 30 CFR 777.14 - Maps and plans: General requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Maps and plans: General requirements. 777.14... REGULATORY PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.14 Maps and plans: General requirements. (a) Maps submitted with applications shall be presented in a consolidated format, to the extent...

  7. Army Task Force on Behavioral Health: Corrective Action Plan

    DTIC Science & Technology

    2013-01-01

    CAP details subsequent actions required to achieve a more ef- ficient and effective disability system for Soldiers with behavioral health conditions...especially those in remote locations, are challenged with filling vacant behavioral health provider posi- tions. The Army must review the effectiveness ...organized to effectively manage the systematic challenges of a comprehen- sive Behavioral Health System of Care. A robust BH network requires pre-positioned

  8. 34 CFR 604.11 - Planning requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... comprehensive planning or policy formulation process which: (1) Considers the relationship between State administration of each applicable program and administration of similar State programs or processes; (2... education within the State; (3) Considers the postsecondary educational needs of unserved and...

  9. 46 CFR 169.305 - Plans required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... integration into the ship's structure. (14) Rigging plan showing sail areas and centers of effort as well as... section for an existing vessel with a history of at least 5 years of safe operation, or if the design and...

  10. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    SciTech Connect

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  11. 32 CFR 552.66 - Actions required by agents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Actions required by agents. 552.66 Section 552.66 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Solicitation on Military Reservations §...

  12. 7 CFR 3550.159 - Borrower actions requiring RHS approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Borrower actions requiring RHS approval. 3550.159 Section 3550.159 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, DEPARTMENT OF AGRICULTURE DIRECT SINGLE FAMILY HOUSING LOANS AND GRANTS Regular Servicing §...

  13. 7 CFR 3550.159 - Borrower actions requiring RHS approval.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Borrower actions requiring RHS approval. 3550.159 Section 3550.159 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, DEPARTMENT OF AGRICULTURE DIRECT SINGLE FAMILY HOUSING LOANS AND GRANTS Regular Servicing §...

  14. 7 CFR 3550.159 - Borrower actions requiring RHS approval.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Borrower actions requiring RHS approval. 3550.159 Section 3550.159 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, DEPARTMENT OF AGRICULTURE DIRECT SINGLE FAMILY HOUSING LOANS AND GRANTS Regular Servicing §...

  15. 41 CFR 101-30.503 - Maintenance actions required.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CATALOG SYSTEM 30.5-Maintenance of the Federal Catalog System § 101-30.503 Maintenance actions required. After converting to the Federal Catalog System, the agency concerned shall promptly take maintenance... (VA), or DLSC when a direct submitter of catalog data is involved in accordance with § 101-30.303. (b...

  16. 36 CFR 72.16 - Preliminary Action Program requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements. 72.16 Section 72.16 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.16 Preliminary... and services offered, and the providers (public agency or private sector). (d) Statement of...

  17. 36 CFR 72.16 - Preliminary Action Program requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements. 72.16 Section 72.16 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.16 Preliminary... and services offered, and the providers (public agency or private sector). (d) Statement of...

  18. 36 CFR 72.16 - Preliminary Action Program requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements. 72.16 Section 72.16 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.16 Preliminary... and services offered, and the providers (public agency or private sector). (d) Statement of...

  19. 41 CFR 101-30.503 - Maintenance actions required.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Maintenance actions required. 101-30.503 Section 101-30.503 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL...

  20. 41 CFR 101-30.503 - Maintenance actions required.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Maintenance actions required. 101-30.503 Section 101-30.503 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL...

  1. 41 CFR 101-30.503 - Maintenance actions required.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Maintenance actions required. 101-30.503 Section 101-30.503 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL...

  2. 41 CFR 101-30.503 - Maintenance actions required.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Maintenance actions required. 101-30.503 Section 101-30.503 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL...

  3. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    SciTech Connect

    Haagenstad, H.T.

    1998-01-15

    made to mitigate the potential impact is identified and the Action Plan for each commitment is described in detail, with a description of actions to be taken, pertinent time frames for the actions, verification of mitigation activities, and identification of agencies/organizations responsible for satisfying the requirements of the commitment.

  4. Action planning in sequential skills: relations to music performance.

    PubMed

    Keller, Peter E; Koch, Iring

    2008-02-01

    The hypothesis that planning music-like sequential actions involves anticipating their auditory effects was investigated in a series of experiments. Participants with varying levels of musical experience responded to each of four colour-patch stimuli by producing a unique sequence of three taps on three vertically aligned keys. Each tap triggered a tone in most experimental conditions. Response--effect (key-to-tone) mapping was either compatible--taps on the top, middle, and bottom keys triggered high, medium, and low pitched tones, respectively--or incompatible--key-to-tone mapping was scrambled, reversed, or neutral (taps on different keys triggered the same tone). The results suggest that action planning was faster with compatible than with incompatible mappings (and faster than with no tones). Furthermore, the size of this compatibility effect grew with increasing musical experience, which suggests that improvements in auditory imagery ability that typically accompany musical training may augment the role of anticipatory auditory-effect representations during planning.

  5. [Applicability of Children's Environment and Health Action Plan in Serbia].

    PubMed

    Ilić, Miroslava Kristoforović

    2010-01-01

    The Children's Environment and Health Action Plan for Europe was adopted at the 4th Ministry Conference on Environment (the World Health Organization, 2004). It is focused on children health care against hazards originating from the human environment. In its conclusion, the need is expressed for the development of national plans in the field of Environmental and Children Health for European region by 2007. Mutual activities would be obligatory for each country and their realization should be the responsibility of Ministers of Health Care and Environmental Health. In our country, a draft version of this document was recently adopted, where the following priority regional goals are proposed: safe drinking water and adequate sanitation, injury prevention and adequate physical activity, clean indoor and outdoor air, the human environment without chemicals. Every segment has been explained in details through activities, expected results, indicators, sources of verification and the main participants in the project implementation. The end of the action plan period is proposed to be the year 2019. It is also followed by a defined set of indicators: exposure, activities and health status. The analyses of particular activities or data to be used have pointed to some drawbacks of this draft version, which can be overcome by respecting expert opinions.

  6. 49 CFR 194.107 - General response plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... obtain any required Federal and State permissions for using alternative response strategies such as in... management system including the functional areas of finance, logistics, operations, planning, and command...

  7. Practice in Planning and Planning in Practice: Re-Assessing and Clarifying Action Research in a Multi-National Context

    ERIC Educational Resources Information Center

    Kusch, Jim; Rebolledo, Geisha; Ryan, Charly

    2005-01-01

    This paper responds to a call seeking presenters for an action-research event for elementary-school science teachers in Venezuela. The authors planned on the assumption that the participants would wish to leave with plans for introducing action-research approaches into their practice. In previous writing on action research, the various protocols…

  8. Practice in Planning and Planning in Practice: Re-Assessing and Clarifying Action Research in a Multi-National Context

    ERIC Educational Resources Information Center

    Kusch, Jim; Rebolledo, Geisha; Ryan, Charly

    2005-01-01

    This paper responds to a call seeking presenters for an action-research event for elementary-school science teachers in Venezuela. The authors planned on the assumption that the participants would wish to leave with plans for introducing action-research approaches into their practice. In previous writing on action research, the various protocols…

  9. Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children

    ERIC Educational Resources Information Center

    Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert

    2013-01-01

    The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…

  10. Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children

    ERIC Educational Resources Information Center

    Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert

    2013-01-01

    The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…

  11. Flexible and Inexpensive: Improving Learning Transfer and Program Evaluation through Participant Action Plans

    ERIC Educational Resources Information Center

    Cowan, Chris A.; Goldman, Ellen F.; Hook, Melissa

    2010-01-01

    Action plans have been shown to improve transfer of learning and have proven an effective tool in training evaluation. This study describes how action planning was simply and successfully adapted to a preexisting curriculum with few additional resources. The decision to use participant action planning, the administration of it, and the…

  12. Report of the Tape Recorder Action Plan Committee, 21 March 1972

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A NASA/AF Tape Recorder Action Plan Committee was formed in January 1972 to investigate tape recorder problems and to recommend an action plan to NASA management. The committee collected data on tape recorder failure history, pinpointed problem areas, discussed needed technical and management changes, and proposed an action plan for the recommended approaches.

  13. Evaluating the Impact of Action Plans on Trainee Compliance with Learning Objectives

    ERIC Educational Resources Information Center

    Aumann, Michael J.

    2013-01-01

    This mixed methods research study evaluated the use of technology-based action plans as a way to help improve compliance with the learning objectives of an online training event. It explored how the action planning strategy impacted subjects in a treatment group and compared them to subjects in a control group who did not get the action plan. The…

  14. Evaluating the Impact of Action Plans on Trainee Compliance with Learning Objectives

    ERIC Educational Resources Information Center

    Aumann, Michael J.

    2013-01-01

    This mixed methods research study evaluated the use of technology-based action plans as a way to help improve compliance with the learning objectives of an online training event. It explored how the action planning strategy impacted subjects in a treatment group and compared them to subjects in a control group who did not get the action plan. The…

  15. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment.

  16. Corrective action investigation plan for the Roller Coaster RADSAFE Area, Corrective Action Unit 407, Tonopah Test Range, Nevada

    SciTech Connect

    1998-04-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. CAUs consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU No. 407, the Roller Coaster RADSAFE Area (RCRSA) which is located on the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range Complex, is approximately 255 km (140 mi) northwest of Las Vegas, Nevada. CAU No. 407 is comprised of only one CAS (TA-23-001-TARC). The RCRSA was used during May and June 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The surface and subsurface soils are likely to have been impacted by plutonium and other contaminants of potential concern (COPCs) associated with decontamination activities at this site. The purpose of the corrective action investigation described in this CAIP is to: identify the presence and nature of COPCs; determine the vertical and lateral extent of COPCs; and provide sufficient information and data to develop and evaluate appropriate corrective actions for the CAS.

  17. Corrective action investigation plan for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada

    SciTech Connect

    1998-03-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 342, the Area 23 Mercury Fire Training Pit (FTP), which is located in Area 23 at the Nevada Test Site (NTS). The NTS is approximately 88 km (55 mi) northwest of Las Vegas, Nevada. Corrective Action Unit 342 is comprised of CAS 23-56-01. The FTP is an area approximately 100 m by 140 m (350 ft by 450 ft) located west of the town of Mercury, Nevada, which was used between approximately 1965 and 1990 to train fire-fighting personnel (REECo, 1991; Jacobson, 1991). The surface and subsurface soils in the FTP have likely been impacted by hydrocarbons and other contaminants of potential concern (COPC) associated with burn activities and training exercises in the area.

  18. Corrective Action Plan for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada

    SciTech Connect

    Bechtel Nevada

    1998-09-30

    This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that the landfill cells were used for solid waste disposal, including disposal of UXO.

  19. Oracle accrual plans from requirements to implementation

    SciTech Connect

    Rivera, Christine K

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  20. The Representation of Action Plans in Long Term Memory

    NASA Technical Reports Server (NTRS)

    Fussfeld, G. N.; Koenig, W.; Karis, D.

    1984-01-01

    A sequence of experiments conducted on a two hand chord typewriter, to compare the efficiency of different coding principles employed to associate letters with their chord productions is described. This keyboard represents an effort to identify effective alternatives to the existing typewriter. It consists of two seperate 5-key panels (one for each hand), and letters are entered by typing chords composed of one to five fingers. Each panel is capable of producing the full alphabet. One group of experiments was designed to separate between perceptual and motor factors in the acivation of single letter chords. The results underline the importance of perceptual factors in the activation of motor plans. The complexity of the patterns employed to represent letters was shown to account for 50 percent of variance in the typing speeds of single letters. The theoretical implications of these results are discussed in relation to a vision based theory of action plans.

  1. The Representation of Action Plans in Long Term Memory

    NASA Technical Reports Server (NTRS)

    Fussfeld, G. N.; Koenig, W.; Karis, D.

    1984-01-01

    A sequence of experiments conducted on a two hand chord typewriter, to compare the efficiency of different coding principles employed to associate letters with their chord productions is described. This keyboard represents an effort to identify effective alternatives to the existing typewriter. It consists of two seperate 5-key panels (one for each hand), and letters are entered by typing chords composed of one to five fingers. Each panel is capable of producing the full alphabet. One group of experiments was designed to separate between perceptual and motor factors in the acivation of single letter chords. The results underline the importance of perceptual factors in the activation of motor plans. The complexity of the patterns employed to represent letters was shown to account for 50 percent of variance in the typing speeds of single letters. The theoretical implications of these results are discussed in relation to a vision based theory of action plans.

  2. 38 CFR 21.80 - Requirement for a rehabilitation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... rehabilitation plan. 21.80 Section 21.80 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Vocational Rehabilitation and Employment Under 38 U.S.C. Chapter 31 Individualized Written Rehabilitation Plan § 21.80 Requirement for a rehabilitation plan. (a...

  3. 38 CFR 21.80 - Requirement for a rehabilitation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... rehabilitation plan. 21.80 Section 21.80 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Vocational Rehabilitation and Employment Under 38 U.S.C. Chapter 31 Individualized Written Rehabilitation Plan § 21.80 Requirement for a rehabilitation plan. (a...

  4. 33 CFR 155.1030 - General response plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... carrying nonhazardous oil field waste may follow the same format as that for a vessel carrying oil as a... SECURITY (CONTINUED) POLLUTION OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS Tank Vessel Response Plans for Oil § 155.1030 General response plan requirements. (a) The plan must cover all...

  5. 33 CFR 155.1030 - General response plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... carrying nonhazardous oil field waste may follow the same format as that for a vessel carrying oil as a... SECURITY (CONTINUED) POLLUTION OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS Tank Vessel Response Plans for Oil § 155.1030 General response plan requirements. (a) The plan must cover all...

  6. 33 CFR 155.1030 - General response plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... carrying nonhazardous oil field waste may follow the same format as that for a vessel carrying oil as a... SECURITY (CONTINUED) POLLUTION OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS Tank Vessel Response Plans for Oil § 155.1030 General response plan requirements. (a) The plan must cover all...

  7. 33 CFR 155.1030 - General response plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... carrying nonhazardous oil field waste may follow the same format as that for a vessel carrying oil as a... SECURITY (CONTINUED) POLLUTION OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS Tank Vessel Response Plans for Oil § 155.1030 General response plan requirements. (a) The plan must cover all...

  8. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  9. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  10. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed...

  11. 49 CFR 194.107 - General response plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... mitigation procedures, (iv) The name, address, and telephone number of the oil spill response organization... PLANS FOR ONSHORE OIL PIPELINES Response Plans § 194.107 General response plan requirements. (a) Each... mitigation or prevention of a substantial threat of a worst case discharge; (ii) Identify environmentally and...

  12. 30 CFR 28.30 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...

  13. [Strategic planning: an important economic action for German hospitals].

    PubMed

    Wiese, Christoph H R; Zink, Wolfgang; Russo, Sebastian G

    2011-11-01

    In medical systems, economic issues and means of action are in the course of dwindling human (physicians and nurses) and financial resources are more important. For this reason, physicians must understand basic economic principles. Only in this way, there may be medical autonomy from social systems and hospital administrators. The current work is an approach to present a model for strategic planning of an anesthesia department. For this, a "strengths", "weaknesses", "opportunities", and "threats" (SWOT) analysis is used. This display is an example of an exemplary anaesthetic department.

  14. The scaup conservation action plan: working toward coherence

    USGS Publications Warehouse

    Austin, Jane E.

    2010-01-01

    The last in a series of three workshops to develop a decision framework for the scaup conservation action plan was conducted in September 2009. Fifteen waterfowl biologists and managers met in Memphis, Tennessee at the Ducks Unlimited Headquarters to review and refine the decision statement, objectives, and prototype model for the continental scaup population, with a special focus on vital rate parameters that are affected during migration and winter. In a significant step toward coherence, the participants also developed models for incorporating human dimensions – hunters – into the decision framework, and to link the population of diving duck hunters with the continental scaup population.

  15. Quality Assurance Plan, N springs expedited response action

    SciTech Connect

    Jackson, G.J.

    1994-07-01

    This document is the Quality Assurance Plan (QAP) to be followed during the definitive design, construction, and operational phases for activities associated with the N Springs Expedited Response Action (ERA) for the 100-NR-2 Operable Unit (OU). Westinghouse Hanford Company (WHC) will comply with the US Department of Energy (DOE) Order 5700.6C, Quality Assurance (DOE 1989), and the US Environmental Protection Agency (EPA), EPA/530-SW-86-031, Technical Guidance Document: Construction Quality Assurance for Hazardous Waste Land Disposal Facilities (EPA 1986).

  16. [Integrated planning in health: a possibility of participative action].

    PubMed

    Assis, M M; Pereira, M J; Mishima, S M

    1997-10-01

    This paper intends to report an experience with the process of integrated planning in a Basic Health Unit at Riberiao Preto-SP. we selected as our object of analysis the interactions and dialogues that were expressed in the scope of the local health system. Therefore, we sought to consider the individual dynamics of this reality and the social agents involved (teachers, students, directors, health workers and community workers), trying to understand the communicative action according to HABERMAS (1989). We believe that this is an open space in the perspective of widening the level of integrated participation in the administration of public health services.

  17. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    ERIC Educational Resources Information Center

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  18. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    ERIC Educational Resources Information Center

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  19. 49 CFR 234.11 - State highway-rail grade crossing action plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false State highway-rail grade crossing action plans... PLANS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway-rail grade crossings in the ten States that...

  20. Impact of action planning on spatial perception: attention matters.

    PubMed

    Kirsch, Wladimir

    2015-03-01

    Previous research suggested that perception of spatial location is biased towards spatial goals of planned hand movements. In the present study I show that an analogous perceptual distortion can be observed if attention is paid to a spatial location in the absence of planning a hand movement. Participants judged the position of a target during preparation of a mouse movement, the end point of which could deviate from the target by a varying degree in Exp. 1. Judgments of target position were systematically affected by movement characteristics consistent with perceptual assimilation between the target and the planned movement goal. This effect was neither due to an impact of motor execution on judgments (Exp. 2) nor due to characteristics of the movement cues or of certain target positions (Exp. 3, Exp. 5A). When the task included deployment of attention to spatial positions (former movement goals) in preparation for a secondary perceptual task, an effect emerged that was comparable with the bias associated with movement planning (Exp. 4, Exp. 5B). These results indicate that visual distortions accompanying manipulations of variables related to action could be mediated by attentional mechanisms.

  1. Materials Requirements Planning: An Organizational Perspective.

    DTIC Science & Technology

    1980-03-01

    Scheule r t il, (00 Planned Ord -eeit o "" __ _ __" - - - __ - -I I MPanned odes rleaaea Gros , requiremniiens I I I- tNot requiram l f a Plannfed r I I...1975. 6. Sanders, Rufus C., "MRP-Mirage or Miracle ," Infosystems, December, 1977. 7. Boyer, Charles H., "Production Control: MRP Ends Guessing at

  2. Corrective Action Investigation Plan for Corrective Action Unit 565: Stored Samples, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    Wickline, Alfred; McCall, Robert

    2006-08-01

    Corrective Action Unit (CAU) 565 is located in Area 26 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 565 is comprised of one corrective action site (CAS) listed--CAS 26-99-04, Ground Zero Soil Samples. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend closure of CAU 565. Additional information will be obtained by conducting a corrective action investigation before evaluating closure objectives and selecting the appropriate corrective action. The results of the field investigation will support closure and waste management decisions that will be presented in the Corrective Action Decision Document/Closure Report. The site will be investigated based on the data quality objectives (DQOs) developed on June 1, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was utilized to identify and define the type, amount, and quality of data needed to develop and evaluate closure for CAU 565. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to this CAS. The scope of the corrective action investigation for CAU 565 includes the following activities: (1) Remove stored samples, shelves, and debris from the interior of Building 26-2106. (2) Perform field screening on stored samples, shelves, and debris. (3) Dispose of stored samples, shelves, and debris. (4) Collect samples of investigation-derived waste, as needed, for waste management purposes. (5) Conduct radiological surveys of Building 26-2106 in accordance with the requirements in the ''NV/YMP Radiological Control Manual'' to determine if there is residual radiological contamination that would prevent the release of the building for unrestricted use. This

  3. 42 CFR 84.40 - Quality control plans; filing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Quality Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... 42 Public Health 1 2010-10-01 2010-10-01 false Quality control plans; filing requirements. 84.40...

  4. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Quality improvement plan (QIP) requirements. 64.8 Section 64.8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a...

  5. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Quality improvement plan (QIP) requirements. 64.8 Section 64.8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a...

  6. 25 CFR 273.18 - Additional requirements for education plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Additional requirements for education plan. 273.18... EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.18 Additional requirements for education plan. In addition to incorporating the programs approved by the Indian...

  7. 33 CFR 155.1225 - Response plan submission requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SECURITY (CONTINUED) POLLUTION OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS Response plan requirements for vessels carrying animal fats and vegetable oils as a primary cargo § 155... vegetable oils as a primary cargo shall submit a response plan in accordance with the requirements of...

  8. 33 CFR 155.1225 - Response plan submission requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SECURITY (CONTINUED) POLLUTION OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS Response plan requirements for vessels carrying animal fats and vegetable oils as a primary cargo § 155... vegetable oils as a primary cargo shall submit a response plan in accordance with the requirements of...

  9. 33 CFR 155.1225 - Response plan submission requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SECURITY (CONTINUED) POLLUTION OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS Response plan requirements for vessels carrying animal fats and vegetable oils as a primary cargo § 155... vegetable oils as a primary cargo shall submit a response plan in accordance with the requirements of...

  10. 33 CFR 155.1225 - Response plan submission requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SECURITY (CONTINUED) POLLUTION OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS Response plan requirements for vessels carrying animal fats and vegetable oils as a primary cargo § 155... vegetable oils as a primary cargo shall submit a response plan in accordance with the requirements of...

  11. 33 CFR 155.1225 - Response plan submission requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SECURITY (CONTINUED) POLLUTION OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS Response plan requirements for vessels carrying animal fats and vegetable oils as a primary cargo § 155... vegetable oils as a primary cargo shall submit a response plan in accordance with the requirements of...

  12. 10 CFR 60.16 - Site characterization plan required.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Site characterization plan required. 60.16 Section 60.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.16 Site characterization plan required. Before proceeding...

  13. 10 CFR 60.16 - Site characterization plan required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Site characterization plan required. 60.16 Section 60.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.16 Site characterization plan required. Before proceeding...

  14. 10 CFR 60.16 - Site characterization plan required.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Site characterization plan required. 60.16 Section 60.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.16 Site characterization plan required. Before proceeding...

  15. 10 CFR 60.16 - Site characterization plan required.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Site characterization plan required. 60.16 Section 60.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.16 Site characterization plan required. Before proceeding...

  16. 10 CFR 60.16 - Site characterization plan required.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Site characterization plan required. 60.16 Section 60.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.16 Site characterization plan required. Before proceeding...

  17. 25 CFR 273.18 - Additional requirements for education plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Additional requirements for education plan. 273.18... EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.18 Additional requirements for education plan. In addition to incorporating the programs approved by the Indian...

  18. 45 CFR 162.925 - Additional requirements for health plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Additional requirements for health plans. 162.925 Section 162.925 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND... payer). (c) Code sets. A health plan must meet each of the following requirements: (1) Accept...

  19. 48 CFR 970.1907-4 - Subcontracting plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907-4 Subcontracting plan requirements. Pursuant to the clause at 48 CFR 52.219-9, Small Business Subcontracting Plan, which is required for all management and operating contracts, each management and operating contract...

  20. 48 CFR 970.1907-4 - Subcontracting plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907-4 Subcontracting plan requirements. Pursuant to the clause at 48 CFR 52.219-9, Small Business Subcontracting Plan, which is required for all management and operating contracts, each management and operating contract...