Science.gov

Sample records for action plan section

  1. The Olympia Proceedings. Section VI: Analysis of the Action Plans.

    ERIC Educational Resources Information Center

    Meyers, Joel; And Others

    1982-01-01

    Within legislative, practice, and professional issues in school psychology, examples of action plans for hypothetical events are presented. These were produced by groups of conference participants to stimulate development of detailed plans for local, state and national use by school psychologists. Action plan resources and implementation and…

  2. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  3. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  4. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  5. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  6. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  7. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  8. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  9. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  10. Planning as Action Research

    ERIC Educational Resources Information Center

    de Gonzalez, Carmen Beatriz; Hernandez, Teresa; Kusch, Jim; Ryan, Charly

    2004-01-01

    Planning contains so much more than the written plan. Early in 2000, an invitation came from the Collaborative Action Research Network (CARN), to people experienced in action research who might want to help plan and present an action research event for elementary school science teachers in Venezuela, South America, in Autumn 2000. This article…

  11. Roof Plans: Section "CC", Roof Plan; Roof Framing Plans: Section ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Roof Plans: Section "C-C", Roof Plan; Roof Framing Plans: Section "C-C", Section "D-D"; Roof Framing Sections: Cross Section "G-G", Cross Section "H-H" - Fort Washington, Fort Washington Light, Northeast side of Potomac River at Fort Washington Park, Fort Washington, Prince George's County, MD

  12. Floor Plans: Section "AA", Section "BB"; Floor Framing Plans: Section ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Floor Plans: Section "A-A", Section "B-B"; Floor Framing Plans: Section "A-A", Section "B-B" - Fort Washington, Fort Washington Light, Northeast side of Potomac River at Fort Washington Park, Fort Washington, Prince George's County, MD

  13. Postpartum Depression Action Plan

    MedlinePlus

    MENU Return to Web version Postpartum Depression | Postpartum Depression Action Plan Patient __________________________ Physician/NP/PA __________________ Clinic ____________________________ Phone Number ____________________ Choose one area and add other areas as you begin to ...

  14. ES H action plan

    SciTech Connect

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  15. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.220 Section 91.220 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Local Governments; Contents of Consolidated Plan § 91.220 Action plan....

  16. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.320 Section 91.320 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS State Governments; Contents of Consolidated Plan § 91.320 Action plan....

  17. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    In order to develop an affirmative action plan at Triton College, the college President appointed a committee made up of nine representatives from the various college constituencies, the majority of which were women and minorities, to determine the objectives to be achieved and how to implement them, and to establish appropriate review procedures.…

  18. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Education, Oklahoma City.

    As mandated by law, this 1983 revision describes the Oklahoma State Department of Education's Affirmative Action Plan and analyzes the employment patterns of the department's work force for that year in light of equal employment opportunity goals. Following a brief policy statement, the development, dissemination, and implementation of the plan…

  19. 29 CFR 30.4 - Affirmative action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 1 2014-07-01 2013-07-01 true Affirmative action plans. 30.4 Section 30.4 Labor Office of... action plans. (a) Adoption of affirmative action plans. A sponsor's commitment to equal opportunity in... affirmative action plan. (b) Definition of affirmative action. Affirmative action is not mere...

  20. 29 CFR 30.4 - Affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 1 2013-07-01 2013-07-01 false Affirmative action plans. 30.4 Section 30.4 Labor Office of... action plans. (a) Adoption of affirmative action plans. A sponsor's commitment to equal opportunity in... affirmative action plan. (b) Definition of affirmative action. Affirmative action is not mere...

  1. 29 CFR 30.4 - Affirmative action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Affirmative action plans. 30.4 Section 30.4 Labor Office of... action plans. (a) Adoption of affirmative action plans. A sponsor's commitment to equal opportunity in... affirmative action plan. (b) Definition of affirmative action. Affirmative action is not mere...

  2. 3RS action plan

    SciTech Connect

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  3. Mitigation Action Plan

    SciTech Connect

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  4. Transpacific section planned

    NASA Astrophysics Data System (ADS)

    Swift, James

    1984-04-01

    A transpacific section across the subpolar gyre near latitude 47°N is planned for September-October 1985. This complements the 24.5°N section planned for March-May 1985. The purpose of the expedition is to determine the western boundary current structure, to determine the meridional flow in the region of the Emperor Seamounts, to measure the transport of heat by ocean currents, to determine the net transport of water masses and estimate the meridional general circulation of the north Pacific, and to improve the mapping of tracer distributions in the deep north Pacific.Approximately 110 surface-to-bottom conductivity, temperature, and depth (CTD) rosette stations across the width of the ocean will be occupied, with maximum station spacing of 80 km over abyssal plains, closing to 30-50 km over rough topography and boundaries. Water samples will be collected and analyzed on board for salinity, oxygen, and nutrients.

  5. Guam Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  6. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Establishing affirmative action plans. 1608.4 Section 1608... AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.4 Establishing affirmative action plans. An affirmative action plan or program under this section shall...

  7. Section BB, Section DD, Plan AA, Plan CC, Typical Framing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Section B-B, Section D-D, Plan A-A, Plan C-C, Typical Framing Detail of Upper Stringers, Typical Framing Detail of Lower Stringers - Covered Bridge, Spanning Connecticut River, Orford, Grafton County, NH

  8. 7 CFR 275.16 - Corrective action planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which:...

  9. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Affirmative action plans. 34.8 Section 34..., applicants or recipients shall have an acceptable affirmative action plan which has been approved by the... paragraph (c) of this section. The affirmative action plan must set forth overall goals and timetables...

  10. Fraser River action plan: Introduction

    SciTech Connect

    1998-12-31

    This report reviews the Fraser River Action Plan, intended to foster a co-operative approach to restoring the environmental health of the Fraser watershed. Topics covered include the Plan`s ecosystem approach; the development of a new model of governance, with the goal of creating a body that would take responsibility for the well-being of the watershed; challenges and accomplishments of Plan programs; and future actions now that the Plan has ended. Completed and future programs are briefly reviewed in such areas as aquatic science, pollution, habitat, agriculture and the environment, and effects of forest practices.

  11. What's an Asthma Action Plan?

    MedlinePlus

    ... KidsHealth in the Classroom What Other Parents Are Reading Upsetting News Reports? What to Say Vaccines: Which ... flow meters. Action plans use symptoms, peak flow readings, or both to help you determine the zone ...

  12. Action Understanding as Inverse Planning

    ERIC Educational Resources Information Center

    Baker, Chris L.; Saxe, Rebecca; Tenenbaum, Joshua B.

    2009-01-01

    Humans are adept at inferring the mental states underlying other agents' actions, such as goals, beliefs, desires, emotions and other thoughts. We propose a computational framework based on Bayesian inverse planning for modeling human action understanding. The framework represents an intuitive theory of intentional agents' behavior based on the…

  13. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  14. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  15. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  16. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  17. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  18. American Samoa Energy Action Plan

    SciTech Connect

    Haase, Scott; Esterly, Sean; Herdrich, David; Bodell, Tim; Visser, Charles

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  19. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or...

  20. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or...

  1. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or...

  2. 24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... comprehensive plan (including five-year action plan). 968.320 Section 968.320 Housing and Urban Development... approval of comprehensive plan (including five-year action plan). (a) Submission of comprehensive plan. (1... Plan. After HUD approves the Comprehensive Plan (including the Five-Year Action Plan), or...

  3. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... for recreation use, derelict and other public lands not designated for recreation; and...

  4. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... for recreation use, derelict and other public lands not designated for recreation; and...

  5. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 13471; 3 CFR, 1984 Comp., p. 193). (b) In this connection, and concurrently with the war or national... 47 Telecommunication 5 2012-10-01 2012-10-01 false Planned actions. 214.4 Section 214.4 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL PROCEDURES FOR THE USE...

  6. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 13471; 3 CFR, 1984 Comp., p. 193). (b) In this connection, and concurrently with the war or national... 47 Telecommunication 5 2014-10-01 2014-10-01 false Planned actions. 214.4 Section 214.4 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL PROCEDURES FOR THE USE...

  7. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 13471; 3 CFR, 1984 Comp., p. 193). (b) In this connection, and concurrently with the war or national... 47 Telecommunication 5 2011-10-01 2011-10-01 false Planned actions. 214.4 Section 214.4 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL PROCEDURES FOR THE USE...

  8. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 13471; 3 CFR, 1984 Comp., p. 193). (b) In this connection, and concurrently with the war or national... 47 Telecommunication 5 2013-10-01 2013-10-01 false Planned actions. 214.4 Section 214.4 Telecommunication OFFICE OF SCIENCE AND TECHNOLOGY POLICY AND NATIONAL SECURITY COUNCIL PROCEDURES FOR THE USE...

  9. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... under 24 CFR part 970); (5) Five-year action plan. (i) General. The comprehensive plan shall include a... entities are set up to plan and implement the consolidated plans (under 24 CFR part 91), the PHA shall...-year action plan). 968.315 Section 968.315 Housing and Urban Development REGULATIONS RELATING...

  10. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... under 24 CFR part 970); (5) Five-year action plan. (i) General. The comprehensive plan shall include a... entities are set up to plan and implement the consolidated plans (under 24 CFR part 91), the PHA shall...-year action plan). 968.315 Section 968.315 Housing and Urban Development REGULATIONS RELATING...

  11. One School's Positive Action Plan.

    ERIC Educational Resources Information Center

    McCormack, Sammie

    Because they felt that students can be responsible for their own behavior, the staff of Jefferson Elementary School, serving 300 students in grades 1 through 4 in a small rural community, developed a program which promoted self-management. In September 1979, teachers participated in an assertive discipline workshop. A Positive Action Plan evolved,…

  12. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Administration of affirmative action plan. 906.5 Section 906.5 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer...

  13. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Formulation of affirmative action plan. 906.4 Section 906.4 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer,...

  14. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Emergency action plans. 1917.30 Section 1917.30 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency action plans—(1) Scope and...

  15. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1917.30 Section 1917.30 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency action plans—(1) Scope and...

  16. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Emergency action plans. 1917.30 Section 1917.30 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency action plans—(1) Scope and...

  17. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  18. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  19. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  20. Texas Solar Collaboration Action Plan

    SciTech Connect

    Winland, Chris

    2013-02-14

    Texas Solar Collaboration Permitting and Interconenction Process Improvement Action Plan. San Antonio-specific; Investigate feasibility of using electronic signatures; Investigate feasibility of enabling other online permitting processes (e.g., commercial); Assess need for future document management and workflow/notification IT improvements; Update Information Bulletin 153 regarding City requirements and processes for PV; Educate contractors and public on CPS Energy’s new 2013 solar program processes; Continue to discuss “downtown grid” interconnection issues and identify potential solutions; Consider renaming Distributed Energy Resources (DER); and Continue to participate in collaborative actions.

  1. Hungarian climate change action plan

    SciTech Connect

    Molnar, S.; Takacs, T.; Arpasi, M.; Farago, T.; Palvoelgyi, T.; Harnos, Z.; Lontay, Z.; Somogyi, Z.; Tajthy, T.

    1998-12-31

    In 1994--1996, within the framework of the US Country Studies Program, the Hungarian Country Study Team developed the national greenhouse gas emission inventory, and elaborated the mitigation options for the different sectors of the economy. In 1997, the development of a National Action Plan was begun as the continuation of this work. Results of the inventory study showed that greenhouse gas emissions decreased from the selected base level (i.e., from the yearly average emissions of 1985--1987) until 1994 by cca. 25%. However, this decrease was primarily caused by the deep economic recession. Therefore the policy makers have to face the problem of economic recovery without a relevant increase of greenhouse gas emissions in the near future. This is the main focus of the mitigation analysis and the National Action Plan.

  2. Affirmative Action Plan. Fourth Edition.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    The aim of this plan is to provide the reader with an outline of the New York State Education Department's commitment to equal employment opportunity and its obligation to comply with various anti-discrimination laws. These laws include the New York State Human Rights Law, the Federal Equal Employment Opportunity Act of 1972, Section 504 of the…

  3. Fraser River action plan: Aquatic science

    SciTech Connect

    1998-12-31

    Reviews research carried out under the Fraser River Action Plan in the field of aquatic science, beginning with research carried out on Fraser River headwater lakes and the contaminants found in those lakes and their fish. Subsequent sections cover research on sediment and contaminant transport, benthic communities, fish species distribution, contaminants in fish, pollution sources (from urban runoff, agriculture, and forestry), pollution in the Fraser estuary, and environmental indicators.

  4. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Affirmative action plan: General. 152.407 Section 152.407 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Nondiscrimination in Airport Aid Program § 152.407 Affirmative action plan: General. (a) Except as provided...

  5. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Affirmative action plans. 34.8 Section 34.8 Public Lands: Interior Office of the Secretary of the Interior REQUIREMENTS FOR EQUAL OPPORTUNITY DURING CONSTRUCTION AND OPERATION OF THE ALASKA NATURAL GAS TRANSPORTATION SYSTEM § 34.8 Affirmative action plans. (a)(1) Within one hundred...

  6. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Nondiscrimination in Airport Aid Program § 152.409 Affirmative action plan standards. (a) Each...

  7. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Affirmative action plans. 34.8 Section 34.8 Public Lands: Interior Office of the Secretary of the Interior REQUIREMENTS FOR EQUAL OPPORTUNITY DURING CONSTRUCTION AND OPERATION OF THE ALASKA NATURAL GAS TRANSPORTATION SYSTEM § 34.8 Affirmative action plans. (a)(1) Within one hundred...

  8. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Affirmative action plans. 34.8 Section 34.8 Public Lands: Interior Office of the Secretary of the Interior REQUIREMENTS FOR EQUAL OPPORTUNITY DURING CONSTRUCTION AND OPERATION OF THE ALASKA NATURAL GAS TRANSPORTATION SYSTEM § 34.8 Affirmative action plans. (a)(1) Within one hundred and...

  9. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100 Emergency action plans. (a) Scope...

  10. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS Emergency Action Plans...

  11. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100 Emergency action plans. (a) Scope...

  12. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100 Emergency action plans. (a) Scope...

  13. Corrective Action Planning for Environmental Compliance Deficiencies

    SciTech Connect

    Sigmon, C. F.; Ashburn, S. A.; Jolley, R. L.; Smith, A. A.; Mercer, A. E.; Oeulette, B.; Renz, K.; Scott, S.

    1995-01-01

    Effective corrective action planning is one of the cornerstones of an effective environmental management program. Alternatively, ineffective planning can highlight an installation`s unwillingness or inability to effectively address environmental compliance deficiencies. The following paper discusses several guidelines to consider in corrective action planning to ensure that plans benefit rather than harm an installation`s overall environmental management program.

  14. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Corrective action plan. 280.66 Section...) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Release Response and Corrective Action for UST Systems Containing Petroleum or...

  15. Final Consolidated action plan to Tiger Team

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implemenation by Sandia and monitoring by DOE. This volume (2) contains information and corrective action plans pertaining to safety and health and management practices.

  16. 76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... the draft, A Public Health Action Plan to Combat Antimicrobial Resistance (76 FR 14402). Written and... HUMAN SERVICES Centers for Disease Control and Prevention Draft Action Plan--A Public Health Action Plan...), Department of Health and Human Services (DHHS). ACTION: Extension of public comment period. SUMMARY: On...

  17. Final consolidated action plan to Tiger Team

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implementation by Sandia and monitoring by DOE. This volume (I) contains the findings and actions concerning the environment. Tables 4.2 and 4.7 summarize the annual costs estimated for completing the actions. The total costs for completion of all the actions are estimated to be $283 million over a 12 year period; the majority of the actions to be completed and costs incurred in the first five years. Resources are provided from DOE-ER/WM, the DOE/DP landlord funds (one time, physical fixes), and from the Sandia Indirect Budget.

  18. Creating a Global Agenda: Assessments, Solutions, and Action Plans.

    ERIC Educational Resources Information Center

    Didsbury, Howard F., Jr., Ed.

    Designed for educational policymakers and researchers, this volume on global issues is divided into four sections. The four essays in the first section, "Reducing the Nuclear Peril," offer a brief documentary survey and then present practical suggestions and action plans to reduce the nuclear threat. The eight papers in the second section,…

  19. Ten Benefits of Participant Action Planning.

    ERIC Educational Resources Information Center

    Youker, Robert B.

    1985-01-01

    Describes the Participant Action Planning Approach (PAPA) process that requires each trainee to prepare a list of concrete actions or changes he or she plans to make back on the job once the training program is over. Benefits of PAPA are discussed, including transfer of learning, verbalization, and commitment. (CT)

  20. NORTH AMERICAN REGIONAL ACTION PLAN ON MERCURY

    EPA Science Inventory

    The North American Regional Action Plan (NARAP) on Mercury is one of a number of action plans that stem from the North American Agreement on Environmental Cooperation between the governments of Canada, Mexico and the United States. That Agreement established the Commission for En...

  1. Exploiting map plans as resources for action

    NASA Technical Reports Server (NTRS)

    Payton, David

    1989-01-01

    When plans are used as programs for controlling the action of autonomous or teleoperated robots, their abstract representation can easily obscure a great deal of the critical knowledge that originally led to the planned course of action. An autonomous vehicle experiment is highlighted which illustrates how the information barriers created by abstraction can result in undesirable action. It is then shown how the same task can be performed correctly using plans as a resource for action. As a result of this simple change in outlook, problems requiring opportunistic reaction to unexpected changes in the environment can be solved.

  2. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Corrective action plan. 280.66 Section 280.66 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE...

  3. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Corrective action plan. 280.66 Section 280.66 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE...

  4. Planning actions in robot automated operations

    NASA Technical Reports Server (NTRS)

    Das, A.

    1988-01-01

    Action planning in robot automated operations requires intelligent task level programming. Invoking intelligence necessiates a typical blackboard based architecture, where, a plan is a vector between the start frame and the goal frame. This vector is composed of partially ordered bases. A partial ordering of bases presents good and bad sides in action planning. Partial ordering demands the use of a temporal data base management system.

  5. The Development of Action Planning in a Joint Action Context

    ERIC Educational Resources Information Center

    Paulus, Markus

    2016-01-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus.…

  6. The development of action planning in a joint action context.

    PubMed

    Paulus, Markus

    2016-07-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus. Their task was to hand the experimenter a tool with which she could activate 1 of 2 different effects on the apparatus. The elicitation of each effect required participants to grasp and insert the tool in a particular orientation. We assessed whether participants planned their grasping and reaching action in such a way that it enabled the partner to efficiently handle the tool, that is, anticipating the final end state of the joint activity. We found that 3-year-old children did not adjust their behavior to accommodate the other's action and that they did not increase their performance over multiple trials. Five- and 7-year-old children initially showed a tendency to plan their action in an egocentric manner (i.e., showed a form of egocentrism), but improved their joint action performance over time. Adult participants demonstrated joint action planning from the beginning. Interestingly, 3- and 5-year-old children were able to plan their grasp efficiently when acting alone on the apparatus. Yet, having first-hand experience with the task before acting with a partner did not facilitate performance in the joint action task for younger children. Overall, the study informs current approaches on the psychological basis and ontogenetic origins of joint action in childhood. (PsycINFO Database Record PMID:27337512

  7. The Climate Change Action Plan: Technical supplement

    SciTech Connect

    Not Available

    1994-03-01

    This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

  8. National Security Technology Incubator Action Plan

    SciTech Connect

    2008-02-28

    This report documents the action plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). This action plan serves as a tool in measuring progress in the development process and delivery of services for the NSTI program. Continuous review and evaluation of the action plan is necessary in the development process of the NSTI. The action plan includes detailed steps in developing the NSTI program based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Included are tasks required to implement the NSTI, developed within a work breakdown structure. In addition, a timeline is identified for each task.

  9. Industry liaison section implementation plan

    NASA Technical Reports Server (NTRS)

    Lakowske, Stephen

    1990-01-01

    The Industry Liaison Section is a new function of the Army/NASA Aircrew-Aircraft Integration (AAAI) Program that is intended to bridge an existing gap between Government developers (including contractors) and outside organizations who are potential users of products and services developed by the AAAI Program. Currently in its sixth year, the Program is experiencing considerable pull from industry and other government organizations to disseminate products. Since the AAAI Program's charter is exploratory and research in nature, and satisfying proper dissemination requirements is in conflict with the rapid prototyping approach utilized by the design team, the AAAI Program has elected to create an Industry Liaison Section (ILS) to serve as the Program's technology transfer focal point. The process by which the ILS may be established, organized and managed is described, including the baseline organizational structure, duties, functions, authority, responsibilities, relations and policies and procedures relevant to the conduct of the ILS.

  10. Gathering Strength: Canada's Aboriginal Action Plan.

    ERIC Educational Resources Information Center

    Department of Indian Affairs and Northern Development, Ottawa (Ontario).

    Designed to renew the relationship between the Canadian government and the Aboriginal peoples of Canada, this action plan contains a statement of reconciliation, a statement of renewal, and four key objectives for action. First, renewing partnerships includes community-based healing to address the negative effects of the residential schools…

  11. SOCIAL ACTION AND INTERACTION IN PROGRAM PLANNING.

    ERIC Educational Resources Information Center

    BEAL, GEORGE M.; AND OTHERS

    TWO RESEARCH FRAMEWORKS, SOCIAL ACTION AND GROUP FORMATION AND MAINTENANCE, WERE CHOSEN TO ANALYZE THE EFFECTIVENESS OF COMMUNICATION STRATEGIES EMPLOYED BY EXTENSION WORKERS. IN A STUDY ON THE INTRODUCTION OF PROGRAM PLANNING INTO A COUNTY, THE FULFILLMENT OF EACH OF 34 STEPS IN THE SOCIAL ACTION PROCESS WAS ANALYZED AND FOUND TO BE ONLY SOMEWHAT…

  12. Addressing Youth Victimization. Action Plan Update.

    ERIC Educational Resources Information Center

    Osofsky, Joy D.

    The Coordinating Council on Juvenile Justice and Delinquency Prevention published an action plan in 1996 that established eight objectives as the foundation for innovative and effective action by federal, state, and local governments, in partnership with private sector organizations, to reduce juvenile violence and victimization. This bulletin…

  13. Action Planning and Recording Achievement.

    ERIC Educational Resources Information Center

    Green, Muriel

    This document examines strategies and procedures that British further education (FE) colleges can use to develop and enhance systems and structures for guiding and supporting learners and learning. It is based on the findings of a field test of the Managing Learning model for planning and recording the process of FE students. First, the importance…

  14. Individual Action Planning: A Practical Guide.

    ERIC Educational Resources Information Center

    Squirrell, Gillian

    This book, which is intended as a practical guide for British teachers and tutors involved in career guidance, explains the process of helping students develop Individual Action Plans (IAPs). IAPs are plans outlining individual personal, vocational, and educational aspirations that students develop in a series of discussion sessions with an…

  15. Ensuring preparedness: Testing an emergency action plan

    SciTech Connect

    Gibson, J.Z.; Hildebrand, L.G. )

    1992-12-01

    For dam owners, having a plan for responding to dam failure is not enough. To ensure that operating personnel and local authorities and emergency response agencies are prepared, the plan needs to be tested periodically. This article describes how Washington Water Power tested its emergency action plan at its Cabinet Gorge project in September, 1990. The objectives, details, and critique of the test are described, as is FERC's five-level exercise testing program.

  16. Remedial action planning for Trench 1

    SciTech Connect

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.

    1998-07-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

  17. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    SciTech Connect

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  18. Planning a DSN support section technical library

    NASA Technical Reports Server (NTRS)

    Bailey, T.; Chatburn, C. C.

    1980-01-01

    The planning procedure being used to establish a technical library for the Deep Space Network support section is described. The inventory and survey methods employed are described and the preliminary results of these methods are discussed.

  19. 24 CFR 248.135 - Plans of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Plans of action. 248.135 Section 248.135 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MORTGAGE AND LOAN...

  20. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex,...

  1. ICDF Complex Remedial Action Work Plan

    SciTech Connect

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  2. Final Action Plan to Tiger Team

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  3. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Affirmative action plan standards. 152.409... action plan standards. (a) Each affirmative action plan required by this subpart shall be developed in... ethnic group with the highest selection rate. (b) Each affirmative action plan required by this...

  4. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Affirmative action plan standards. 152.409... action plan standards. (a) Each affirmative action plan required by this subpart shall be developed in... ethnic group with the highest selection rate. (b) Each affirmative action plan required by this...

  5. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Affirmative action plan standards. 152.409... action plan standards. (a) Each affirmative action plan required by this subpart shall be developed in... ethnic group with the highest selection rate. (b) Each affirmative action plan required by this...

  6. Emergency Action Plans in Physical Education

    ERIC Educational Resources Information Center

    Tanis, Cindy J.; Hebel, Susan L.

    2016-01-01

    Emergency Action Plans (EAP) are essential to properly manage injuries and illnesses in physical education and sport. However, most literature discusses EAP's in the athletic arena instead of physical education. The purpose of this study was to examine physical education instructors' experiences of student illness and injury, discuss the steps of…

  7. Triton College Faculty Recruitment Action Plan (FRAP).

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    Triton College's (Illinois) Faculty Recruitment Action Plan (FRAP) provides a detailed guide to hiring new faculty, focusing on the desired characteristics of new faculty; marketing and recruitment strategies; employment incentives; the application, interviewing, and selection process; new faculty orientation; a timeline for implementation; cost…

  8. Action Plan for Florida's Public Libraries. Addendum.

    ERIC Educational Resources Information Center

    Florida Library Study Commission, Tallahassee.

    The introduction to this addendum (the Action Plan is LI 004 521) discusses the present use by libraries of information-handling technology and identifies some of the trends taking place in performing essential library services. While some limited inroads have been made in automating certain public library functions, the bulk of services is still…

  9. Housekeeping category corrective action unit work plan

    SciTech Connect

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  10. Action plan for the Tiger Team assessment report

    SciTech Connect

    Not Available

    1990-08-30

    This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

  11. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  12. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  13. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  14. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  15. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... be planned and implemented. The Mitigation Action Plan shall be prepared before the FONSI is issued... action to be covered by the FONSI, as appropriate. DOE may revise the Plan as more specific and...

  16. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 4 2011-07-01 2011-07-01 false Affirmative action plans or programs under State or local law. 1608.7 Section 1608.7 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or...

  17. The WHO's action plan for oral health.

    PubMed

    Monajem, S

    2009-02-01

    The oral health action plan, recommended for adoption to the Sixtieth World Health Assembly of the World Health Organization in January 2007, included many of the necessary components. Had fissure sealants been added to the list of prevention methods and the roles of dental educational institutions and hygiene community better clarified, the action plan would have made a more viable and realistic package for the ministries and their directors of national programmes receiving the support of the World Health Organization and partners. Sealants remain under-utilized, few dental hygienists are integrated in the primary oral health team and fewer dental graduates have had service-learning experiences--all contradictory to the evidence in the literature. Translating research findings into public health action programmes is one of the recommendations made in the action plan and one way we can begin this is by implementing sealant programmes in 'Health Promoting Schools' that are WHO's brain child and borne of the wisdom of using schools as 'platforms' for the promotion and delivery of health care to the community. PMID:19215314

  18. 76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ..., Prevention and Control, Research, and Product Development. The Action Plan contains specific action items... Healthcare Research and Quality (AHRQ), the Centers for Medicare and Medicaid Services (CMS), the Health.... Tanja Popovic, Deputy Associate Director for Science, Centers for Disease Control and...

  19. National Biofuels Action Plan, October 2008

    SciTech Connect

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  20. Fraser River action plan: Forest industries

    SciTech Connect

    1998-12-31

    This research reviews the activities conducted under the Fraser River Action Plan with regard to forest industries and their effects on the Fraser River Basin environment. The review covers the following topics: Projects to cut pollution from wood preservatives and pulp/paper mills; ecological effects of pulp mill effluents; wood waste and its utilization; habitat conservation; environmentally sound forestry practices; riparian conservation; habitat and ecosystem protection; and the use of economic instruments as an alternative to regulation.

  1. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  2. 40 CFR 49.11 - Actions under section 301(d)(4) authority.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Tribal Authority § 49.11 Actions under section 301(d)(4... unreasonable delay such Federal implementation plan provisions as are necessary or appropriate to protect air... tribal implementation plan meeting the completeness criteria of 40 CFR part 51, appendix V, or does...

  3. 24 CFR 248.217 - Revisions to plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AUTHORITIES PREPAYMENT OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income Preservation Act of 1987 § 248.217 Revisions to plan of action. The owner may from time to...

  4. 29 CFR 30.4 - Affirmative action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... these regulations, sponsors are expected to make appropriate adjustments in goal levels. See 29 CFR 30.8... affirmative action plan. (b) Definition of affirmative action. Affirmative action is not mere passive... affirmative action plan must also include adequate provision for outreach and positive recruitment that...

  5. Fraser River action plan: Urban issues

    SciTech Connect

    1998-12-31

    This report reviews the state of the environment around urban areas on the Fraser River watershed and Fraser River Action Plan activities as they relate to minimizing the effect of urban areas on the environment. Subjects covered include the effect of cities on the environment; signs of urban stress; the importance of urban runoff as a pollution source, with a case study of the Brunette River watershed; sewage treatment and water conservation; non-point sources of pollution and management practices; recycling; contaminated sites; air quality and its management; habitat protection; and wood waste as a potential resource.

  6. Affirmative Action Plan, October 1991--September 1992

    SciTech Connect

    Not Available

    1991-10-01

    This report documents Reynolds Electrical Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the Handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations. All personnel decisions are made at the Company level. Decisions regarding the General Manager or Deputy General Manager are made at the corporate level.

  7. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Policy statement on affirmative action (see section 13B). 60-3.17 Section 60-3.17 Public Contracts and Property Management Other... management objectives, a systematic plan based on sound organizational analysis and problem identification...

  8. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 1 2014-07-01 2014-07-01 false Policy statement on affirmative action (see section 13B). 60-3.17 Section 60-3.17 Public Contracts and Property Management Other... management objectives, a systematic plan based on sound organizational analysis and problem identification...

  9. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Policy statement on affirmative action (see section 13B). 60-3.17 Section 60-3.17 Public Contracts and Property Management Other... management objectives, a systematic plan based on sound organizational analysis and problem identification...

  10. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Policy statement on affirmative action (see section 13B). 60-3.17 Section 60-3.17 Public Contracts and Property Management Other... management objectives, a systematic plan based on sound organizational analysis and problem identification...

  11. 40 CFR 77.4 - Administrator's action on proposed offset plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Administrator's action on proposed offset plans. 77.4 Section 77.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) EXCESS EMISSIONS § 77.4 Administrator's action on proposed offset plans....

  12. 77 FR 38296 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... HUMAN SERVICES Centers for Disease Control and Prevention Draft Public Health Action Plan--A National Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... Federal Register requesting public comment on the draft National Public Health Action Plan for...

  13. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... HUMAN SERVICES Centers for Disease Control and Prevention Draft Public Health Action Plan--A National Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... requesting public comment on the draft National Public Health Action Plan for the Detection, Prevention,...

  14. SADC establishes a regional action plan.

    PubMed

    Klouda, T

    1997-02-01

    The regional meeting held on AIDS strategy in Lilongwe, Malawi, in December, 1996, made important advances. The 12 countries of the SADC (Southern Africa Development Community) joined the European Union to institute a regional action plan for the reduction of susceptibility of people to HIV because of social, cultural, and environmental factors; the vulnerability of people with HIV infection to social and other difficulties; and the vulnerability of institutions because of the foregoing impacts. At the conference the issues explored were employment, mining, medical drugs, education, and tourism. An employment charter was seen as crucial for the success of AIDS and workplace activities. Facilitation of travel across borders was important for the reduction of susceptibility to HIV infection. Enhancement of regional policies for essential drugs was vital for drugs for the treatment of AIDS. The clarification of the regional role was critical for regional support of national action (strengthening technical and institutional capacities) and for regional joint action such as studies on research, harmonization of data collection on HIV/AIDS; organization of training; development of information and education on HIV/AIDS; facilitation of manufacturing of drugs and condoms; and the development of a regional information and education program about HIV/AIDS. The conference also clarified HIV/AIDS programs in relation to other health and socioeconomic problems. PMID:12292055

  15. Clean slate corrective action investigation plan

    SciTech Connect

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

  16. Affirmative Action Plans, January 1, 1994--December 31, 1994. Revision

    SciTech Connect

    Not Available

    1994-02-16

    This document is the Affirmative Action Plan for January 1, 1994 through December 31, 1994 for the Lawrence Berkeley Laboratory, University of California (``LBL`` or ``the Laboratory.``) This is an official document that will be presented upon request to the Office of Federal Contract Compliance Programs, US Department of Labor. The plan is prepared in accordance with the Executive Order 11246 and 41 CFR Section 60-1 et seq. covering equal employment opportunity and will be updated during the year, if appropriate. Analyses included in this volume as required by government regulations are based on statistical comparisons. All statistical comparisons involve the use of geographic areas and various sources of statistics. The geographic areas and sources of statistics used here are in compliance with the government regulations, as interpreted. The use of any geographic area or statistic does not indicate agreement that the geographic area is the most appropriate or that the statistic is the most relevant. The use of such geographic areas and statistics is intended to have no significance outside the context of this Affirmative Action Plan, although, of course, such statistics and geographic areas will be used in good faith with respect to this Affirmative Action Plan.

  17. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 543: LIQUID DISPOSAL UNITS, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2006-09-01

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved Corrective Action Decision Document.

  18. 78 FR 42071 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance... the public comment period for the proposed guidance ``PAG Manual: Protective Action Guides (PAGs)...

  19. 76 FR 28181 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Sunland Park Section...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-16

    ...EPA is taking direct final action approving a revision to the New Mexico State Implementation Plan (SIP). The submitted revision consists of a maintenance plan for Sunland Park, New Mexico, developed to ensure continued attainment of the 1997 8-Hour National Ambient Air Quality Standard (NAAQS or standard) through the year 2014. The Maintenance Plan meets the requirements of Section 110(a)(1)......

  20. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  1. Gathering Strength: Canada's Aboriginal Action Plan. A Progress Report = Rassembler nos forces: Le plan d'action du Canada pour les questions autochtones. Rapport d'etape.

    ERIC Educational Resources Information Center

    Department of Indian Affairs and Northern Development, Ottawa (Ontario).

    Gathering Strength is an integrated government-wide plan to address the key challenges facing Canada's Aboriginal people. Following an initial section on reconciliation of historic grievances, this report describes initiatives in the four areas addressed by the action plan: (1) partnerships (all schools received public awareness materials;…

  2. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true Formulation of...

  3. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Formulation of...

  4. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false Formulation of...

  5. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Formulation of...

  6. Final Consolidated action plan to Tiger Team. Volume 2

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implemenation by Sandia and monitoring by DOE. This volume (2) contains information and corrective action plans pertaining to safety and health and management practices.

  7. LP Daac Product Lifecyle Plan in Action

    NASA Astrophysics Data System (ADS)

    Bennett, S. D.

    2014-12-01

    The Land Processes Distributed Active Archive Center (LP DAAC) is a NASA Earth Observing System (EOS) Data and Information System (EOSDIS) DAAC that supports selected EOS Community non-standard data products such as the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) Global Emissivity Database (GED), and also supports NASA Earth Science programs such as Making Earth System Data Records for Use in Research Environments (MEaSUREs) to contribute in providing long-term, consistent, and mature data products. To support and deliver excellence for NASA data stewardship, and to accommodate long-tail data preservation with Community and MEaSUREs products, the LP DAAC introduces a Product Lifecycle Plan that features a phased project framework to facilitate long-term product preservation. The first phase, Inception, captures all artifacts applied by the Product Developer(s) and develops Earth Science Data Records based on product artifacts. The second phase, Active Archive, distributes, promotes and provides services for the matured products to the science community. The third and final phase, Long-term Archive, establishes a permanent preservation location for all project artifacts. This poster depicts the LP DAAC Product Lifecycle Plan in action using the LP DAAC recently released NASA WELD Version 1.5 artifacts and phased objectives.

  8. On the Inclusion of Externally Controlled Actions in Action Planning

    ERIC Educational Resources Information Center

    Tsai, Jessica Chia-Chin; Knoblich, Gunther; Sebanz, Natalie

    2011-01-01

    According to ideomotor theories, perceiving action effects produced by others triggers corresponding action representations in the observer. We tested whether this principle extends to actions performed by externally controlled limbs and tools. Participants performed a go-no-go version of a spatial compatibility task in which their own actions…

  9. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  10. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  11. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  12. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility....

  13. Hazardous Waste Remedial Actions Program: Remedial Actions Planning Program Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1989-04-01

    The purpose of this Plan is to describe the quality assurance (QA) requirements for the RAP Program by identifying the quality elements to be controlled and specifying how they will be controlled. The activities for which control elements will be identified include those relating to: preparation, review, and approval of plans, reports, and studies; execution of field and analytical work by subcontractors and other agents; control of subcontractors and other agents during other phases of work; and actions internal to the RAP Program to ensure proper execution of projects.

  14. ORD Strategic Action Plan for Information Management / Information Technology 2011

    EPA Science Inventory

    ORD's Strategic Action Plan for IM/IT (2011) was collaboratively developed with input from ORD research and administrative personnel. It identifies actions necessary to support ORD's priority IM and IT needs.

  15. 40 CFR 52.2635 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.2635 Section 52.2635 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wyoming § 52.2635 Original identification of plan section. (a)...

  16. 40 CFR 52.1689 - Original Identification of plan section.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Original Identification of plan section. 52.1689 Section 52.1689 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New York § 52.1689 Original Identification of plan section....

  17. 40 CFR 52.1535 - Original identification of plan section.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Original identification of plan section. 52.1535 Section 52.1535 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1535 Original identification of plan section....

  18. 40 CFR 52.2635 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Original identification of plan section. 52.2635 Section 52.2635 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wyoming § 52.2635 Original identification of plan section. (a)...

  19. 40 CFR 52.2635 - Original identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Original identification of plan section. 52.2635 Section 52.2635 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wyoming § 52.2635 Original identification of plan section. (a)...

  20. 40 CFR 52.2299 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Original identification of plan section. 52.2299 Section 52.2299 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Texas § 52.2299 Original identification of plan section. (a)...

  1. 40 CFR 52.1640 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Original identification of plan section. 52.1640 Section 52.1640 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Mexico § 52.1640 Original identification of plan section....

  2. 40 CFR 52.2299 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.2299 Section 52.2299 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Texas § 52.2299 Original identification of plan section. (a)...

  3. 40 CFR 52.2186 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Original identification of plan section. 52.2186 Section 52.2186 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) South Dakota § 52.2186 Original identification of plan section....

  4. 40 CFR 52.2465 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Original identification of plan section. 52.2465 Section 52.2465 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2465 Original identification of plan section....

  5. 40 CFR 52.677 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Original identification of plan section. 52.677 Section 52.677 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.677 Original identification of plan section. (a) This...

  6. 40 CFR 52.939 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan section. 52.939 Section 52.939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kentucky § 52.939 Original identification of plan section. (a) This...

  7. 40 CFR 52.677 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Original identification of plan section. 52.677 Section 52.677 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.677 Original identification of plan section. (a) This...

  8. 40 CFR 52.939 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Original identification of plan section. 52.939 Section 52.939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kentucky § 52.939 Original identification of plan section. (a) This...

  9. 40 CFR 52.2239 - Original Identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Original Identification of plan section. 52.2239 Section 52.2239 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Tennessee § 52.2239 Original Identification of plan section....

  10. 40 CFR 52.2239 - Original Identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Original Identification of plan section. 52.2239 Section 52.2239 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Tennessee § 52.2239 Original Identification of plan section....

  11. 40 CFR 52.1426 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.1426 Section 52.1426 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nebraska § 52.1426 Original identification of plan section....

  12. 40 CFR 52.2386 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Original identification of plan section. 52.2386 Section 52.2386 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Vermont § 52.2386 Original identification of plan section. (a)...

  13. 40 CFR 52.2386 - Original identification of plan section.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Original identification of plan section. 52.2386 Section 52.2386 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Vermont § 52.2386 Original identification of plan section. (a)...

  14. 40 CFR 52.2465 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.2465 Section 52.2465 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2465 Original identification of plan section....

  15. 40 CFR 52.1535 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.1535 Section 52.1535 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1535 Original identification of plan section....

  16. 40 CFR 52.2239 - Original Identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original Identification of plan section. 52.2239 Section 52.2239 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Tennessee § 52.2239 Original Identification of plan section....

  17. 40 CFR 52.1322 - Original Identification of Plan Section.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Original Identification of Plan Section. 52.1322 Section 52.1322 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Missouri § 52.1322 Original Identification of Plan Section....

  18. 40 CFR 52.2239 - Original Identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Original Identification of plan section. 52.2239 Section 52.2239 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Tennessee § 52.2239 Original Identification of plan section....

  19. 40 CFR 52.1960 - Original Identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original Identification of plan section. 52.1960 Section 52.1960 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1960 Original Identification of plan section....

  20. 40 CFR 52.1640 - Original identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Original identification of plan section. 52.1640 Section 52.1640 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Mexico § 52.1640 Original identification of plan section....

  1. 40 CFR 52.1640 - Original identification of plan section.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Original identification of plan section. 52.1640 Section 52.1640 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Mexico § 52.1640 Original identification of plan section....

  2. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    USDOE /NV

    1999-05-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document.

  3. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document contains the planned actions to correct the deficiences identified in the Tiger Team Assessments of Sandia California (August 1990) and Sandia New Mexico (May 1991). Information is also included on the management structures, estimated costs, root causes, prioritization and schedules for the Action Plan. This Plan is an integration of the two individual Action Plans to provide a cost effective, integrated program for implementation by Sandia and monitoring by DOE. This volume (I) contains the findings and actions concerning the environment. Tables 4.2 and 4.7 summarize the annual costs estimated for completing the actions. The total costs for completion of all the actions are estimated to be $283 million over a 12 year period; the majority of the actions to be completed and costs incurred in the first five years. Resources are provided from DOE-ER/WM, the DOE/DP landlord funds (one time, physical fixes), and from the Sandia Indirect Budget.

  4. 40 CFR 52.1960 - Original Identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 52.1960, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1960 Original Identification of plan section. (a) This section identifies the original “State of Oklahoma...

  5. 40 CFR 52.1960 - Original Identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 52.1960, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1960 Original Identification of plan section. (a) This section identifies the original “State of Oklahoma...

  6. 40 CFR 52.1960 - Original Identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... § 52.1960, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1960 Original Identification of plan section. (a) This section identifies the original “State of Oklahoma...

  7. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d)...

  8. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative...

  9. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative...

  10. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative...

  11. 14 CFR 152.407 - Affirmative action plan: General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Affirmative action plan: General. 152.407... shall have an affirmative action plan that meets the requirements of § 152.409 and is kept on file for... on file for review by the FAA Office of Civil Rights, one of the following: (1) An affirmative...

  12. Adult Basic Skills: Developing a Local Action Plan.

    ERIC Educational Resources Information Center

    Basic Skills Agency, London (England).

    This document presents advice from the United Kingdom's Basic Skills Agency regarding developing local action plans. The first 20% of the document defines basic skills and discusses the following action plan components: (1) an estimate of the area's need for basic skills training; (2) a target to reduce the area's estimated scale of need; (3)…

  13. Education for All: National Plan of Action, 2003-2015

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    Background: The Lao People's Democratic Republic (PDR) Education for All National Plan of Action (EFA NPA) for 2003-2015 seeks to accomplish three major tasks: equitable access, improved quality and relevance and strengthened education management. Purpose: To design a National Education For All Action Plan for basic education in Lao PDR which…

  14. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document is a compilation of different issues identified by the Tiger Teams at the several locations of the Sandia National Laboratory. In this volume there are findings/concerns and the resultant responses and planned actions for these issues. Also included are the schedules and costs for the planned actions.

  15. Smart Buildings: Business Case and Action Plan

    SciTech Connect

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  16. The role of action control and action planning on fruit and vegetable consumption.

    PubMed

    Zhou, Guangyu; Gan, Yiqun; Miao, Miao; Hamilton, Kyra; Knoll, Nina; Schwarzer, Ralf

    2015-08-01

    Globally, fruit and vegetable intake is lower than recommended despite being an important component to a healthy diet. Adopting or maintaining a sufficient amount of fruit and vegetables in one's diet may require not only motivation but also self-regulatory processes. Action control and action planning are two key volitional determinants that have been identified in the literature; however, it is not fully understood how these two factors operate between intention and behavior. Thus, the aim of the current study was to explore the roles of action control and action planning as mediators between intentions and dietary behavior. A longitudinal study with three points in time was conducted. Participants (N = 286) were undergraduate students and invited to participate in a health behavior survey. At baseline (Time 1), measures of intention and fruit and vegetable intake were assessed. Two weeks later (Time 2), action control and action planning were assessed as putative sequential mediators. At Time 3 (two weeks after Time 2), fruit and vegetable consumption was measured as the outcome. The results revealed action control and action planning to sequentially mediate between intention and subsequent fruit and vegetable intake, controlling for baseline behavior. Both self-regulatory constructs, action control and action planning, make a difference when moving from motivation to action. Our preliminary evidence, therefore, suggests that planning may be more proximal to fruit and vegetable intake than action control. Further research, however, needs to be undertaken to substantiate this conclusion. PMID:25819607

  17. 90. Photographic copy of plan of bins, section of boot, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    90. Photographic copy of plan of bins, section of boot, and photograph of construction originally published in Plans of Grain Elevators (Chicago; Grain Dealers Journal, 1918), p.53. PLAN OF BINS; SECTION OF BOOT; VIEW OF CONSTRUCTION LOOKING NORTHWEST - Northwestern Consolidated Elevator "A", 119 Fifth Avenue South, Minneapolis, Hennepin County, MN

  18. 89. Photographic copy of exterior photograph, section, profile and plan ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    89. Photographic copy of exterior photograph, section, profile and plan of Northwestern Consolidated Elevator A originally published in Plans of Grain Elevators (Chicago: Grain Dealers Journal, 1918), p. 52. VIEW OF NORTH AND WEST SIDES OF NORTHWESTERN CONSOLIDATED ELEVATOR A; SECTION AND PROFILE; PLAN OF RECEIVING SINKS - Northwestern Consolidated Elevator "A", 119 Fifth Avenue South, Minneapolis, Hennepin County, MN

  19. An Economic Evaluation of Asthma Action Plans for Children with Asthma

    PubMed Central

    Polisena, Julie; Tam, Susanna; Lodha, Abhay; Laporte, Audrey; Coyte, Peter C.; Ungar, Wendy J.

    2016-01-01

    The costs and effectiveness of asthma action plans for children were evaluated in a cross-sectional economic analysis. Direct health care and indirect costs, nights with symptoms, and asthma attacks were measured in 879 Ontario children with asthma. From a societal perspective, the total annual costs of the asthma action plan and the control groups were CDN$6, 948 and CDN$6, 140 per patient, respectively. Health outcomes were similar. The difference in cost was attributable to greater medication and health services use in the intervention group. Prospective randomized trials are necessary to measure potential improvements in control of asthma using asthma action plans. PMID:17885851

  20. K basins interim remedial action health and safety plan

    SciTech Connect

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  1. Planning my actions to accommodate yours: joint action development during early childhood.

    PubMed

    Meyer, Marlene; van der Wel, Robrecht P R D; Hunnius, Sabine

    2016-05-01

    The planning and adjusting of one's actions in relation to an action partner is fundamental to smooth joint action. During their first years of life, children gradually become more engaged in joint actions. Here, we investigated whether and at what age children take their partner into account in their action plans to accommodate the other's actions. We focused on children's proactive planning (without prior experience) and flexible adjustment of action plans over time. In a behavioural study, we tested 96 children from four age groups (2½, 3, 3½ and 5 years) in a joint cup-stacking task. Children passed cups to their partner who had only one hand available (alternating over time) to build a tower. Children's response choices were assessed (i.e. passing the cup on the free or occupied side to their partner). The study yielded two major findings. At all ages, children proactively planned their actions in a way that accommodated their partner's actions. However, only by 3½ years did children start to flexibly integrate their partner into their action plans. Even at age 5, children only showed minimal adjustments to their action partner. Candidate processes underlying these developmental changes (e.g. inhibitory control, cognitive flexibility, perspective taking) are discussed. PMID:27069048

  2. Legally Best Practices in Section 504 Plans

    ERIC Educational Resources Information Center

    Holler, Rachel; Zirkel, Perry A.

    2008-01-01

    Section 504 is civil rights legislation that is part of the Rehabilitation Act of 1973. Section 504 directly affects public schools, prohibiting discrimination against persons with disabilities. More specifically to students with disabilities, Section 504 provides various procedural protections and, for students, an entitlement to "appropriate…

  3. 40 CFR 300.440 - Procedures for planning and implementing off-site response actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Procedures for planning and implementing off-site response actions. 300.440 Section 300.440 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES...

  4. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Notice and timing of CMS action on State plan material. 457.160 Section 457.160 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES Introduction; State Plans...

  5. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Notice and timing of CMS action on State plan material. 457.160 Section 457.160 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES Introduction; State Plans...

  6. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Notice and timing of CMS action on State plan material. 457.160 Section 457.160 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES Introduction; State Plans...

  7. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Notice and timing of CMS action on State plan material. 457.160 Section 457.160 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES Introduction; State Plans...

  8. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Notice and timing of CMS action on State plan material. 457.160 Section 457.160 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES Introduction; State Plans...

  9. Planning action No. 2 planning criteria. Arapaho and Roosevelt National Forests and Pawnee National Grassland. Forest plan revision

    SciTech Connect

    Not Available

    1992-06-01

    The development of planning criteria is the second phase in the revision of the Forest Plan. Planning criteria are designed to guide the collection and use of inventory data and information, the analysis of the management situation, and the design, formulation, and evaluation of alternatives. Volume I of Planning Action 2 describes the specific methods used to analyze the management situation. Volume II of the Planning Action 2 describes the analysis process planned for the Forest Plan Revision. It includes a discussion of how to formulate and evaluate the alternatives, plus a summary of the needs for completion of Planning Action 4, the Analysis of the Management Situation (AMS).

  10. 63. PLANS FOR PROPOSED HISTORICAL CANAL SECTION AND PUBLIC BOAT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. PLANS FOR PROPOSED HISTORICAL CANAL SECTION AND PUBLIC BOAT LAUNCH RAMP Plan Sheet D-29976, Venice Canals Rehabilitation, Sheet 25 of 26 (delineated by Manuel Bartolome, November 1991) - Venice Canals, Community of Venice, Los Angeles, Los Angeles County, CA

  11. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... involving incentives, an appraisal using the residential income approach; (7) In the case of a plan of... approval of the proposed plan of action. (Approved by the Office of Management and Budget under control... except for that documentation deemed “proprietary information” under § 248.101. (b) Contents. The plan...

  12. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  13. Action planning in a virtual context after prefrontal cortex damage.

    PubMed

    Zalla, T; Plassiart, C; Pillon, B; Grafman, J; Sirigu, A

    2001-01-01

    Patients with frontal lobe lesions are known to encounter severe problems in the organisation of their behaviour in everyday life. Script generation tasks assess the subject's conceptual ability to formulate and evaluate a coherent and structured plan of action. In the present study, we investigated to what extent neuropsychological deficits observed at the conceptual level of action knowledge lead to impairments in action execution. We examined seven patients with prefrontal cortex damage and sixteen normal subjects. Subjects were first asked to verbally formulate a plan of action and then to use this knowledge for 'executing' the actions in a virtual 3-dimensional interactive apartment presented on a computer screen. The results indicated that the presence of the realistic context improved patients' performance. However, specific impairments were observed in patients in the execution condition, namely actions slips, omissions, failure in initiating actions and purposeless displacements. Moreover, an analysis of planning time showed that, differently of the patients group, normal subjects spent more time during plan execution as compared to plan generation. These results suggest that after a frontal lobe lesion a defective formulation of a routine plan might affect the execution of the corresponding course of actions. PMID:11369400

  14. National Action Plan for Energy Efficiency Report

    SciTech Connect

    National Action Plan for Energy Efficiency

    2006-07-01

    Summarizes recommendations, key barriers, and methods for energy efficiency in utility ratemaking as well as revenue requirements, resource planning processes, rate design, and program best practices.

  15. 1. PLAN, ELEVATIONS, SECTION, DETAIL (Surviving portion of facade incorporated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. PLAN, ELEVATIONS, SECTION, DETAIL (Surviving portion of facade incorporated into Pan Am Building, Strandgade) - Strandgade (House), Corner of Strand Street & Queen's Cross Street, Christiansted, St. Croix, VI

  16. Site Plan & Transverse Section Chickamauga National Military Park ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan & Transverse Section - Chickamauga National Military Park Tour Roads, Alexander's Bridge, At the confluence of West Chickamauga Creek and Gordon's Slough, Fort Oglethorpe, Catoosa County, GA

  17. Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada

    SciTech Connect

    Bechtel Nevada

    1998-08-31

    This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

  18. The Effectiveness of Written Action Plans in Atopic Dermatitis.

    PubMed

    Sauder, Maxwell B; McEvoy, Alana; Sampson, Margaret; Kanigsberg, Nordau; Vaillancourt, Regis; Ramien, Michele L; Zemek, Roger

    2016-03-01

    Atopic dermatitis (AD) is a chronic dermatosis requiring a stepwise and dynamic approach to management. The use of written action plans has been shown to improve outcomes in other chronic diseases that require a similar incremental approach. A systematic review was performed to evaluate the effect of a written eczema action plan (EAP) in AD management and to identify characteristics of effective action plans in children with eczema. Only two trials were identified as eligible, which highlights the need for more research on EAPs. PMID:26776967

  19. Manpower Planning Criteria Manual, Construction Grants Section.

    ERIC Educational Resources Information Center

    Texas State Dept. of Water Resources, Austin.

    This document presents the material developed in conjunction with a project directed to test a methodology that a state water pollution control agency can use in determining its manpower and training needs. Included is a compilation of the manpower planning criteria used to relate numbers and types of personnel with deferred workloads. It also…

  20. Heart Truth for Women: An Action Plan

    MedlinePlus

    ... care provider, a registered dietitian, or a qualified nutritionist to help you develop a sensible plan for ... exercise specialists, physical and occupational therapists, dietitians or nutritionists, and psychologists or other mental health specialists. Rehab ...

  1. 40 CFR 52.1426 - Original identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... plan revision to meet the requirements of 40 CFR 58.20, dealing with statewide air quality monitoring... § 52.1426, see the List of CFR Sections Affected, which appears in the Finding Aids section of the..., 1995. This includes the following citations: Article I (except Section 6); Article II, Sections...

  2. 40 CFR 52.1426 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... plan revision to meet the requirements of 40 CFR 58.20, dealing with statewide air quality monitoring... § 52.1426, see the List of CFR Sections Affected, which appears in the Finding Aids section of the..., 1995. This includes the following citations: Article I (except Section 6); Article II, Sections...

  3. Learning through Participatory Action Research for Community Ecotourism Planning.

    ERIC Educational Resources Information Center

    Guevara, Jose Roberto Q.

    1996-01-01

    Ecologically sound tourism planning and policy require an empowering community participation. The participatory action research model helps a community gain understanding of its social reality, learn how to learn, initiate dialog, and discover new possibilities for addressing its situation. (SK)

  4. Controlling Asthma New Guidelines. New Medications. New Action Plans.

    MedlinePlus

    ... version of this page please turn Javascript on. New Guidelines. New Medications. New Action Plans. People everywhere and in every age ... I am putting the finishing touches on my new studio album that we hope to have out ...

  5. 40 CFR 52.2134 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... surveillance plan revision to satisfy the requirements of 40 CFR part 58, submitted on March 10, 1980 by the... affecting § 52.2134, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... (ii) Other material. (A) None. (35) (36) The maintenance plan for Cherokee County submitted by...

  6. 40 CFR 52.2134 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... surveillance plan revision to satisfy the requirements of 40 CFR part 58, submitted on March 10, 1980 by the... affecting § 52.2134, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... (ii) Other material. (A) None. (35) (36) The maintenance plan for Cherokee County submitted by...

  7. 14. Photograph of sheet 2 (general plan; section @ crown, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photograph of sheet 2 (general plan; section @ crown, plan, and elevation) of the Indiana State Highway Commission repair plans of 1969 for the Cicott Street Bridge. Photograph of a 24' by 36' print made from microfilm in the archives of the Indiana Department of Transportation in Indianapolis. - Cicott Street Bridge, Spanning Wabash River at State Road 25, Logansport, Cass County, IN

  8. 40 CFR 52.2134 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... surveillance plan revision to satisfy the requirements of 40 CFR part 58, submitted on March 10, 1980 by the... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) South Carolina §...

  9. Climate Action Planning at the University of New Hampshire

    ERIC Educational Resources Information Center

    Cleaves, Sara M.; Pasinella, Brett; Andrews, Jennifer; Wake, Cameron

    2009-01-01

    Purpose: The purpose of this paper is to discuss the recent history of climate action planning at the University of New Hampshire (UNH), a public university with a long history of sustainability action and commitment. Items discussed include a partnership with Clean Air-Cool Planet (CA-CP) to produce a greenhouse gas (GHG) inventory tool that…

  10. 24 Command Fire Improvement Action Program Plan

    SciTech Connect

    GRIFFIN, G.B.

    2000-12-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

  11. Building air quality: Action plan, June 1998

    SciTech Connect

    1998-11-01

    To promote the use of these straightforward practices to improve IAQ, EPA and other leaders in the IAQ field developed this 8-step plan. This additional resource meets the needs of building owners and managers who want an easy-to-understand path for taking their building from current conditions and practices to the successful institutionalization of good IAQ management practices.

  12. Hawaii's Adolescent Wellness Plan: Laulima in Action.

    ERIC Educational Resources Information Center

    Hawaii State Dept. of Health, Honolulu.

    Based on a need in Hawaii for a multilevel responsibility and commitment to ensure adolescent wellness, the Hawaii Adolescent Wellness Team developed a plan based on research and discussions with a variety of professionals and community leaders in health, education, and social service. This resource handbook is designed to assist communities in…

  13. Action Planning in Young Children's Tool Use

    ERIC Educational Resources Information Center

    Cox, Ralf F. A.; Smitsman, Ad W.

    2006-01-01

    Tool use consists of at least two coupled phases of activities, involving multi-step problem solving. It therefore provides an interesting window on the development of planning in goal-directed behavior. This study investigated 2-year-olds' and 3-year-olds' hand use in picking up and subsequently using a tool for displacing a target-object towards…

  14. Action Planning: Rowing in the Same Direction

    ERIC Educational Resources Information Center

    Hewson, Kurtis; Adrian, Lorna

    2008-01-01

    Two years ago, as Claresholm Elementary School prepared for a new year with a new principal, it had the usual shopping list of ambitions--focus on student learning, support the staff, empower parents, and more. However, in examining the school's improvement plan it became apparent that the school staff had a unique opportunity to develop solid…

  15. Monitoring the Curriculum: From Plan to Action.

    ERIC Educational Resources Information Center

    Maglaras, Tom; Lynch, Deborah

    1988-01-01

    The Aurora Public School System (Colorado) has devised a plan to ensure implementation of the adopted curriculum. By developing a program monitoring process and incorporating it in a handbook, staff can rate their behavior and use "green flags" or "red alerts" to characterize subject area strengths and deficiencies. (MLH)

  16. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... of the effect of the proposed changes on existing tenants. (6) In the case of a plan of action involving incentives, an appraisal using the residential income approach; (7) In the case of a plan of... reasonably be expected to serve; and (8) A market study which demonstrates that the project is located in...

  17. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  18. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... responding to contaminated soil and ground water. In either case, owners and operators are responsible for... to the plan made by the implementing agency. They must monitor, evaluate, and report the results of... effective cleanup, begin cleanup of soil and ground water before the corrective action plan is...

  19. Crisis action planning and replanning using SIPE-2

    NASA Technical Reports Server (NTRS)

    Skidmore, Jennifer D.

    1993-01-01

    Rome Laboratory and DARPA are jointly sponsoring an initiative to develop the next generation of AI planning and scheduling technology focused on military operations planning, especially for crisis situations. SRI International has demonstrated their knowledge-based planning technology in this domain with a system called SOCAP, System for Operations Crisis Action Planning. SOCAP's underlying power comes from SIPE-2, a hierarchical, domain-independent, nonlinear AI planner also developed at SRI. This paper discusses the features of SIPE-2 that made it an ideal choice for military operations planning and which contributed greatly to SOCAP's success.

  20. 30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What information must I include in the âEmergency response action planâ section? 254.23 Section 254.23 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE...

  1. White House Climate Action Plan Hotly Debated in Senate Hearing

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2014-01-01

    Emotions ran high among senators at a 16 January U.S. Senate hearing on the White House's Climate Action Plan; the hearing included administration officials and other supporters of the plan as well as opponents. The plan, which President Barack Obama presented in June 2013 (see Eos, 94(27), 239, doi:10.1002/2013EO270003), calls for cutting carbon pollution, preparing the nation for the impacts of climate change, and leading international efforts to address climate change.

  2. McClellan AFB Management Action Plan (MAP) submittal

    SciTech Connect

    Not Available

    1992-12-23

    This Management Action Plan ('Action Plan' or 'MAP') contains a status summary of the McClellan Air Force Base (McAFB) environmental restoration and compliance programs and presents a comprehensive strategy for implementing response actions necessary to protect human health and the environment. This strategy integrates activities under both the Installation Restoration Program (IRP) and the Environmental Compliance Program (ECP). This Action Plan is a dynamic document that will be updated on a regular basis using the change-a-page looseleaf binder concept for day-to-day revisions along with a subsection at the end of each chapter to highlight any modifications or innovations since the previous major annual review/update.

  3. Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0

    SciTech Connect

    Susan Evans

    2004-11-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release

  4. Section BB Hatch Coating; Framing Plan on Line C Lodging ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Section B-B Hatch Coating; Framing Plan on Line C Lodging Knees at Hatch; Elevation A-A Hull Framing; Section at Hatch Frame 36, Starboard Looking Aft; Midship Section Frame 37, Port Looking Aft - Steam Schooner WAPAMA, Kaiser Shipyard No. 3 (Shoal Point), Richmond, Contra Costa County, CA

  5. 40 CFR 52.2299 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... identification of plan section. (a) This section identifies the original “Texas Air Pollution Control... was submitted by the Texas Air Control Board (TACB) on February 8, 1972. (Nonregulatory) (2) A... section XI, paragraph C.3: Rule 9: Regulation V and control strategy for photochemical...

  6. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SECTION 8 AND PUBLIC HOUSING FAMILY SELF-SUFFICIENCY PROGRAM Program Development and Approval Procedures... local FSS program, and shall contain, at a minimum, the following information: (1) Family demographics... to agree to execute an FSS contract of participation. (4) FSS family selection procedures....

  7. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs.

  8. An Affirmative Action Plan Response to Office of Civil Rights Enforcement Action.

    ERIC Educational Resources Information Center

    Stewart, Ned A., Jr.

    The affirmative action concept developed out of case law as the courts decided passive attempts at desegregating schools failed to achieve results and out of civil rights legislation as administrative agencies adopted the court-established standards. A major challenge of affirmative action plans is to prevent court-approved goals from becoming…

  9. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  10. Global tropospheric chemistry: A plan for action

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Prompted by an increasing awareness of the influence of human activity on the chemistry of the global troposphere, a panel was formed to (1) assess the requirement for a global study of the chemistry of the troposphere; (2) develop a scientific strategy for a comprehensive plan taking into account the existing and projected programs of the government; (3) assess the requirements of a global study in terms of theoretical knowledge, numerical modeling, instrumentation, observing platforms, ground-level observational techniques, and other related needs; and (4) outline the appropriate sequence and coordination required to achieve the most effective utilization of available resources. Part 1 presents a coordinated national blueprint for scientific investigations of biogeochemical cycles in the global troposphere. part 2 presents much of the background information of the present knowledge and gaps in the understanding of tropospheric chemical cycles and processes from which the proposed program was developed.

  11. The role of action planning and plan enactment for smoking cessation

    PubMed Central

    2013-01-01

    Background Several studies have reemphasized the role of action planning. Yet, little attention has been paid to the role of plan enactment. This study assesses the determinants and the effects of action planning and plan enactment on smoking cessation. Methods One thousand and five participants completed questionnaires at baseline and at follow-ups after one and six months. Factors queried were part of the I-Change model. Descriptive analyses were used to assess which plans were enacted the most. Multivariate linear regression analyses were used to assess whether the intention to quit smoking predicted action planning and plan enactment, and to assess which factors would predict quitting behavior. Subsequently, both multivariate and univariate regression analyses were used to assess which particular action plans would be most effective in predicting quitting behavior. Similar analyses were performed among a subsample of smokers prepared to quit within one month. Results Smokers who intended to quit smoking within the next month had higher levels of action planning than those intending to quit within a year. Additional predictors of action planning were being older, being female, having relatively low levels of cigarette dependence, perceiving more positive and negative consequences of quitting, and having high self-efficacy toward quitting. Plan enactment was predicted by baseline intention to quit and levels of action planning. Regression analysis revealed that smoking cessation after six months was predicted by low levels of depression, having a non-smoking partner, the intention to quit within the next month, and plan enactment. Only 29% of the smokers who executed relatively few plans had quit smoking versus 59% of the smokers who executed many plans. The most effective preparatory plans for smoking cessation were removing all tobacco products from the house and choosing a specific date to quit. Conclusion Making preparatory plans to quit smoking is important

  12. first floor plan, east elevation, north elevation, building section, paneling ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    first floor plan, east elevation, north elevation, building section, paneling details, crown molding and location map - Cedar Pass Lodge, Cabin 1-2, 20681 South Dakota Highway 240, Interior, Jackson County, SD

  13. first floor plan, building section, west elevation, south elevation, baseboard ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    first floor plan, building section, west elevation, south elevation, baseboard profile, crown molding profile, window and door details - Cedar Pass Lodge, Cabin 22, 20681 South Dakota Highway 240, Interior, Jackson County, SD

  14. first floor plan, west elevation, north elevation, building section, door ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    first floor plan, west elevation, north elevation, building section, door details, window details, paneling details, crown molding and location map - Cedar Pass Lodge, Cabin 14-16, 20681 South Dakota Highway 240, Interior, Jackson County, SD

  15. first floor plan, north elevation, east elevation, building section, door ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    first floor plan, north elevation, east elevation, building section, door details, window details, crown molding and location map - Cedar Pass Lodge, Cabin 9, 20681 South Dakota Highway 240, Interior, Jackson County, SD

  16. 8. Historic plan, section, and detail drawing of observation blockhouse. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Historic plan, section, and detail drawing of observation blockhouse. NASA GRC drawing no. CE-101540, June29, 1955 (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, Observation Blockhouse, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  17. 7. PHOTOCOPY, PLANS, ELEVATIONS, AND SECTION DRAWING FOR MISSILE TEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. PHOTOCOPY, PLANS, ELEVATIONS, AND SECTION DRAWING FOR MISSILE TEST AND ASSEMBLY BUILDING. - NIKE Missile Base SL-40, Missile Test & Assembly Building, South end of launch area, northeast of Generator Building No. 3, Hecker, Monroe County, IL

  18. Photocopy of longitudinal, cross sections and roof plan of the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of longitudinal, cross sections and roof plan of the C.B. & Q. R.R. roundhouse and locomotive shops. June 1980. - Chicago, Burlington & Quincy Railroad, Roundhouse & Shops, Broadway & Spring Streets, Aurora, Kane County, IL

  19. 23. DETAILS, INCLUDING PIER PLAN AND SECTION AND PLACEMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. DETAILS, INCLUDING PIER PLAN AND SECTION AND PLACEMENT OF REINFORCING STEEL, DETAIL OF RAILING, FLOOR SYSTEM REINFORCEMENT. February 4, 1922 - Chili Bar Bridge, Spanning South Fork of American River at State Highway 193, Placerville, El Dorado County, CA

  20. 123. SECTION, ELEVATION, AND PLAN OF ENGINE HOUSE, 1843 Frederic ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    123. SECTION, ELEVATION, AND PLAN OF ENGINE HOUSE, 1843 Frederic Graff, Jr., Collection of Philadelphia Museum of Art - Fairmount Waterworks, East bank of Schuylkill River, Aquarium Drive, Philadelphia, Philadelphia County, PA

  1. 16. Power plant roof plan and wall sections, sheet 65 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Power plant roof plan and wall sections, sheet 65 of 130 - Naval Air Station Fallon, Power Plant, 800 Complex, off Carson Road near intersection of Pasture & Berney Roads, Fallon, Churchill County, NV

  2. 40 CFR 52.1974 - Original identification of plan section.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Environmental Quality submitted a plan revision to meet the requirements of Air Quality Monitoring 40 CFR part... exception of section 300 (6). EPA only approves the sampling procedures and test methods specified in 40...

  3. 34. GENERAL DRAWING BASCULE PLAN, ELEVATION, AND SECTION. Operator's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. GENERAL DRAWING - BASCULE PLAN, ELEVATION, AND SECTION. Operator's (tender's) house and list of drawings. Courtesy of Strauss Bascule Bridge Company, 1929. - Congress Street Bascule Bridge, Spanning Fort Point Channel at Congress Street, Boston, Suffolk County, MA

  4. Site Plan and Transverse Section Chickamauga National Military Park ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan and Transverse Section - Chickamauga National Military Park Tour Roads, Gordon's Slough Bridge, At the confluence of Alexander's Bridge Road and Gordon's Slough, southeast of Alexander's Bridge, Fort Oglethorpe, Catoosa County, GA

  5. Site Plan & Site Section of Citrus Landscape (Showing Relationship ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan & Site Section of Citrus Landscape (Showing Relationship of Groves & Irrigation System to Grove Canal) - Arlington Heights Citrus Landscape, Southwestern portion of city of Riverside, Riverside, Riverside County, CA

  6. Site Plan & Site Section of Citrus Landscape (Showing Relationship ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan & Site Section of Citrus Landscape (Showing Relationship of Victoria Avenue to Citrus Groves) - Arlington Heights Citrus Landscape, Southwestern portion of city of Riverside, Riverside, Riverside County, CA

  7. 3. PHOTOCOPY, ARCHITECTURAL AND STRUCTURAL PLAN, ELEVATIONS, AND SECTION DRAWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. PHOTOCOPY, ARCHITECTURAL AND STRUCTURAL PLAN, ELEVATIONS, AND SECTION DRAWING FOR WATER TREATMENT PUMPING AND STORAGE BUILDING. - NIKE Missile Base SL-40, Water Treatment & Storage Building, Southern portion of launch area, southeast of Ready Building, Hecker, Monroe County, IL

  8. 41. OPERATING CORRIDOR PLAN AND SECTIONS, INCLUDING SOME ISOMETRIC DETAILS. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. OPERATING CORRIDOR PLAN AND SECTIONS, INCLUDING SOME ISOMETRIC DETAILS. INEEL DRAWING NUMBER 200-0633-00-287-106455. FLUOR NUMBER 5775-CPP-633-P-60 - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  9. ERECTION PLANS (TOP AND BOTTOM), ELEVATION AND SECTIONS FOR STEEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ERECTION PLANS (TOP AND BOTTOM), ELEVATION AND SECTIONS FOR STEEL TRUSS AT SPAN 2, APALACHICOLA RIVER BRIDGE, SHEET 5507-8-E1 - Apalachicola River Bridge, State Route 20 spanning the Apalachicola River, Blountstown, Calhoun County, FL

  10. ERECTION PLANS (TOP AND BOTTOM), ELEVATION AND SECTIONS FOR STEEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ERECTION PLANS (TOP AND BOTTOM), ELEVATION AND SECTIONS FOR STEEL TRUSS AT SPAN 3, APALACHICOLA RIVER BRIDGE, SHEET 5507-8-E2 - Apalachicola River Bridge, State Route 20 spanning the Apalachicola River, Blountstown, Calhoun County, FL

  11. ERECTION PLANS (TOP AND BOTTOM), ELEVATION AND SECTIONS FOR STEEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ERECTION PLANS (TOP AND BOTTOM), ELEVATION AND SECTIONS FOR STEEL TRUSS AT SPAN 5, APALACHICOLA RIVER BRIDGE, SHEET 5505-6-E2 - Apalachicola River Bridge, State Route 20 spanning the Apalachicola River, Blountstown, Calhoun County, FL

  12. ERECTION PLANS (TOP AND BOTTOM), ELEVATION AND SECTIONS FOR STEEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ERECTION PLANS (TOP AND BOTTOM), ELEVATION AND SECTIONS FOR STEEL TRUSS AT SPAN 1, APALACHICOLA RIVER BRIDGE, SHEET 5505-6-E1 - Apalachicola River Bridge, State Route 20 spanning the Apalachicola River, Blountstown, Calhoun County, FL

  13. ERECTION PLANS (TOP AND BOTTOM), ELEVATION AND SECTIONS FOR STEEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ERECTION PLANS (TOP AND BOTTOM), ELEVATION AND SECTIONS FOR STEEL TRUSS AT SPAN 4, APALACHICOLA RIVER BRIDGE, SHEET 5507-8-E3 - Apalachicola River Bridge, State Route 20 spanning the Apalachicola River, Blountstown, Calhoun County, FL

  14. 4. FLOOR PLAN AND SECTIONS, ADDITION TO POWER HOUSE. United ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. FLOOR PLAN AND SECTIONS, ADDITION TO POWER HOUSE. United Engineering Company Ltd., Alameda Shipyard. Also includes plot plan at 1 inch to 100 feet. John Hudspeth, architect, foot of Main Street, Alameda, California. Sheet 3. Plan no. 10,548. Scale 1/4 inch and h inch to the foot. April 30, 1945, last revised 6/22/45. pencil on vellum - United Engineering Company Shipyard, Boiler House, 2900 Main Street, Alameda, Alameda County, CA

  15. 32. Plan of Bookcase and Fireplace / Section thru Bookcase ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. Plan of Bookcase and Fireplace / Section thru Bookcase / Elevation of Living Room Looking North / Part South Wall Boys Living Room / West Wall of Boys Living Room / Front Elevation / Fireplace in Boy's Living Room, Plan of Fireplace (drawing 9) - Whittier State School, Hospital & Receiving Building, 11850 East Whittier Boulevard, Whittier, Los Angeles County, CA

  16. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    SciTech Connect

    Haagenstad, H.T.

    1998-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP). This MAPAR provides a status on specific DARHT facility design- and construction-related mitigation actions that have been initiated in order to fulfill DOE`s commitments under the DARHT MAP. The functions of the DARHT MAP are to (1) document potentially adverse environmental impacts of the Phased Containment Option delineated in the Final EIS, (2) identify commitments made in the Final EIS and ROD to mitigate those potential impacts, and (3) establish Action Plans to carry out each commitment (DOE 1996). The DARHT MAP is divided into eight sections. Sections 1--5 provide background information regarding the NEPA review of the DARHT project and an introduction to the associated MAP. Section 6 references the Mitigation Action Summary Table which summaries the potential impacts and mitigation measures; indicates whether the mitigation is design-, construction-, or operational-related; the organization responsible for the mitigation measure; and the projected or actual completion data for each mitigation measure. Sections 7 and 8 discuss the Mitigation Action Plan Annual Report and Tracking System commitment and the Potential Impacts, Commitments, and Action Plans respectively. Under Section 8, potential impacts are categorized into five areas of concern: General Environment, including impacts to air and water; Soils, especially impacts affecting soil loss and contamination; Biotic Resources, especially impacts affecting threatened and endangered species; Cultural/Paleontological Resources, especially impacts affecting the archeological site known as Nake`muu; and Human Health and Safety, especially impacts pertaining to noise and radiation. Each potential impact includes a brief statement of the nature of the impact and its cause(s). The commitment

  17. 24 CFR 248.233 - Approval of a plan of action that includes incentives.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ....C. 2000d); the Fair Housing Act (42 U.S.C. 3601-3619); Executive Order 11063 (3 CFR 1959-1963 comp... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Approval of a plan of action that includes incentives. 248.233 Section 248.233 Housing and Urban Development Regulations Relating to...

  18. 24 CFR 248.233 - Approval of a plan of action that includes incentives.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ....C. 2000d); the Fair Housing Act (42 U.S.C. 3601-3619); Executive Order 11063 (3 CFR 1959-1963 comp... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Approval of a plan of action that includes incentives. 248.233 Section 248.233 Housing and Urban Development Regulations Relating to...

  19. 18 CFR 12.23 - Time for filing emergency action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Time for filing emergency action plan. 12.23 Section 12.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER...

  20. 18 CFR 12.23 - Time for filing emergency action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Time for filing emergency action plan. 12.23 Section 12.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER...

  1. 18 CFR 12.23 - Time for filing emergency action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Time for filing emergency action plan. 12.23 Section 12.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER...

  2. 18 CFR 12.23 - Time for filing emergency action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Time for filing emergency action plan. 12.23 Section 12.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER...

  3. 18 CFR 12.23 - Time for filing emergency action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Time for filing emergency action plan. 12.23 Section 12.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER...

  4. 42 CFR 430.15 - Basis and authority for action on State plan material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Basis and authority for action on State plan material. 430.15 Section 430.15 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS GRANTS TO STATES FOR MEDICAL...

  5. Beta band modulations underlie action representations for movement planning.

    PubMed

    Turella, Luca; Tucciarelli, Raffaele; Oosterhof, Nikolaas N; Weisz, Nathan; Rumiati, Raffaella; Lingnau, Angelika

    2016-08-01

    To be able to interact with our environment, we need to transform incoming sensory information into goal-directed motor outputs. Whereas our ability to plan an appropriate movement based on sensory information appears effortless and simple, the underlying brain dynamics are still largely unknown. Here we used magnetoencephalography (MEG) to investigate this issue by recording brain activity during the planning of non-visually guided reaching and grasping actions, performed with either the left or right hand. Adopting a combination of univariate and multivariate analyses, we revealed specific patterns of beta power modulations underlying varying levels of neural representations during movement planning. (1) Effector-specific modulations were evident as a decrease in power in the beta band. Within both hemispheres, this decrease was stronger while planning a movement with the contralateral hand. (2) The comparison of planned grasping and reaching led to a relative increase in power in the beta band. These power changes were localized within temporal, premotor and posterior parietal cortices. Action-related modulations overlapped with effector-related beta power changes within widespread frontal and parietal regions, suggesting the possible integration of these two types of neural representations. (3) Multivariate analyses of action-specific power changes revealed that part of this broadband beta modulation also contributed to the encoding of an effector-independent neural representation of a planned action within fronto-parietal and temporal regions. Our results suggest that beta band power modulations play a central role in movement planning, within both the dorsal and ventral stream, by coding and integrating different levels of neural representations, ranging from the simple representation of the to-be-moved effector up to an abstract, effector-independent representation of the upcoming action. PMID:27173760

  6. 40 CFR 52.2134 - Original identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... surveillance plan revision to satisfy the requirements of 40 CFR part 58, submitted on March 10, 1980 by the... affecting § 52.2134, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... Health and Environmental Control. (6) Revised SO2 emission limits for fuel combustion sources...

  7. 40 CFR 52.1426 - Original identification of plan section.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... plan revision to meet the requirements of 40 CFR 58.20, dealing with statewide air quality monitoring... § 52.1426, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... extension in order to meet the primary standard for NOx in the Omaha-Council Bluffs AQCR....

  8. 40 CFR 52.2063 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... source review shall be conducted in accordance with the good engineering practice requirements of 40 CFR... Ozone State Implementation Plan. (B) Regulation V, Section I, “Definitions” for the terms Petroleum Solvents and Petroleum Solvent Dry Cleaning; and Section XI, “Petroleum Solvent Dry Cleaning”...

  9. 40 CFR 52.2063 - Original identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... source review shall be conducted in accordance with the good engineering practice requirements of 40 CFR... Ozone State Implementation Plan. (B) Regulation V, Section I, “Definitions” for the terms Petroleum Solvents and Petroleum Solvent Dry Cleaning; and Section XI, “Petroleum Solvent Dry Cleaning”...

  10. 40 CFR 52.2063 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... source review shall be conducted in accordance with the good engineering practice requirements of 40 CFR... Ozone State Implementation Plan. (B) Regulation V, Section I, “Definitions” for the terms Petroleum Solvents and Petroleum Solvent Dry Cleaning; and Section XI, “Petroleum Solvent Dry Cleaning”...

  11. 40 CFR 52.2465 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... to the plan submitted on May 4, 1972, by the Virginia Air Pollution Control Board. (2) Revisions to control strategy for particulate matter, section IV, Rules 3 and 7 of the Virginia Air Pollution Control...) Revisions to nitrogen dioxide control strategy regulations section 705.05 of the Virginia Air...

  12. 40 CFR 52.1426 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plan revision to meet the requirements of 40 CFR 58.20, dealing with statewide air quality monitoring... § 52.1426, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... Environmental Control on February 21, 1975. (12) Compliance schedules were submitted by the Department...

  13. 40 CFR 52.200 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... plan to incorporate Federal Prevention of Significant Deterioration (PSD) Regulations 40 CFR 52.21 by... § 52.200, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... were held was submitted by the State Department of Pollution Control and Ecology on January 25,...

  14. 40 CFR 52.200 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plan to incorporate Federal Prevention of Significant Deterioration (PSD) Regulations 40 CFR 52.21 by... § 52.200, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... were held was submitted by the State Department of Pollution Control and Ecology on January 25,...

  15. 40 CFR 52.200 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... plan to incorporate Federal Prevention of Significant Deterioration (PSD) Regulations 40 CFR 52.21 by... § 52.200, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... were held was submitted by the State Department of Pollution Control and Ecology on January 25,...

  16. 40 CFR 52.200 - Original identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... plan to incorporate Federal Prevention of Significant Deterioration (PSD) Regulations 40 CFR 52.21 by... § 52.200, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... were held was submitted by the State Department of Pollution Control and Ecology on January 25,...

  17. 40 CFR 52.200 - Original identification of plan section.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... plan to incorporate Federal Prevention of Significant Deterioration (PSD) Regulations 40 CFR 52.21 by... § 52.200, see the List of CFR Sections Affected, which appears in the Finding Aids section of the... were held was submitted by the State Department of Pollution Control and Ecology on January 25,...

  18. 40 CFR 52.1960 - Original Identification of plan section.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... § 52.1960, see the List of CFR Sections Affected, which appears in the Finding Aids section of the...-regulatory). (14) Revisions to the plan for attainment of standards for ozone, carbon monoxide, and....7 for determining the capture efficiency of control devices associated with coating operations....

  19. 20. GEOLOGY, PLAN AND PROFILE, SHOWING LINED AND UNLINED SECTIONS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. GEOLOGY, PLAN AND PROFILE, SHOWING LINED AND UNLINED SECTIONS, AND DETAILED TYPICAL CROSS SECTIONS. Leeds, Hill, Barnard & Jewett drawing, no number, revised 3-20-42. - Salinas River Project, Cuesta Tunnel, Southeast of U.S. 101, San Luis Obispo, San Luis Obispo County, CA

  20. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    SciTech Connect

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department

  1. 29 CFR 1608.12 - Equal employment opportunity plans adopted pursuant to section 717 of title VII.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section 717 of title VII. 1608.12 Section 1608.12 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF... VII. If adherence to an Equal Employment Opportunity Plan, adopted pursuant to section 717 of...

  2. 76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... QUALITY National Ocean Council; Strategic Action Plan Content Outlines AGENCY: Council on Environmental Quality. ACTION: Notice of Availability, Strategic Action Plan Content Outlines; Request for Comments... priority objectives. As a first step, Federal interagency writing teams have developed content outlines...

  3. State Action Plan for Iowa. "Marketing" Marketing Education.

    ERIC Educational Resources Information Center

    Omega Group, Inc., Haverford, PA.

    An Iowa project identified curriculum, program standards, and a framework for promoting marketing education programs. The mission for the state action plan for marketing education is to develop a strategy to revitalize Iowa's marketing education for the 21st century. Three goals support this mission: (1) create a community-wide awareness of the…

  4. Awarding Educational Credit for CETA Training: A Plan of Action.

    ERIC Educational Resources Information Center

    Sullins, W. Robert; And Others

    A project was conducted to determine problems or barriers prohibiting awarding credit for Comprehensive Employment and Training Act (CETA) training in Virginia. Potential solutions and strategies for their implementation were to be identified. A variety of methods were used to obtain information required to produce a Plan of Action that presents…

  5. Action Plan for the Development of Civic Morality

    ERIC Educational Resources Information Center

    Chinese Education and Society, 2006

    2006-01-01

    This paper discusses the action plan for the development of civic morality. Here, the importance, substance, ideology and policy principles guiding the development of civic morality is elaborated. In order to strengthen the development of civic morality, it is a must to adapt to the requirements of the developing situation; seize good…

  6. Guide for Planning a High School Environmental Action Conference.

    ERIC Educational Resources Information Center

    Wanless, Angie, Comp.; And Others

    The purpose of this manual is to provide guidelines and suggestions for people organizing an environmental action conference for high school students. The format and planning suggestions are based on the methods used for a conference organized by the Wisconsin Center for Environmental Education in 1991. The bulk of the manual provides structure…

  7. Affirmative Action Plan. Access, Equity, Opportunity. Fifth Edition.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    The Affirmative Action Plan of the New York State Education Department is described in this document. First, a policy statement is provided by the New York State Education Department, committing the Department to the development of: (1) programmatic approaches to the elimination of all unjust exclusionary employment practices, policies, and…

  8. Evaluation criteria for communications-related corrective action plans

    SciTech Connect

    1997-02-01

    This document provides guidance and criteria for US Nuclear Regulatory Commission (NRC) personnel to use in evaluating corrective action plans for nuclear power plant communications. The document begins by describing the purpose, scope, and applicability of the evaluation criteria. Next, it presents background information concerning the communication process, root causes of communication errors, and development and implementation of corrective actions. The document then defines specific criteria for evaluating the effectiveness of the corrective action plan, interview protocols, and an observation protocol related to communication processes. This document is intended only as guidance. It is not intended to have the effect of a regulation, and it does not establish any binding requirements or interpretations of NRC regulations.

  9. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... savings association (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan within... submit or implement in any material respect an acceptable capital restoration plan, the...

  10. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... savings association (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan within... submit or implement in any material respect an acceptable capital restoration plan, the...

  11. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... savings association (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan within... submit or implement in any material respect an acceptable capital restoration plan, the...

  12. Predicting Changes in Physical Activity among Adolescents: The Role of Self-Efficacy, Intention, Action Planning and Coping Planning

    ERIC Educational Resources Information Center

    Araujo-Soares, Vera; McIntyre, Teresa; Sniehotta, Falko F.

    2009-01-01

    This paper aims to test the direct predictors of the theory of planned behaviour (TPB), action planning and coping planning as predictors of changes in physical activity (PA) in 157 adolescents (mean age: 12). TPB measures, the Action Planning and Coping Planning Scales (APCPS) and the International Physical Activity Questionnaires were measured…

  13. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 536: AREA 3 RELEASE SITE, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2005-09-01

    CAU 536 consists of CAS 03-44-02, Steam Jenny Discharge, located in Area 3 of the NTS. The site was characterized in 2004 according to the approved CAIP and the site characterization results are reported in the CAU 536 CADD. The purpose of this Corrective Action Plan (CAP) is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 536 CADD.

  14. TEMPORARY STORAGE BUILDING NO. 776; FLOOR PLAN, SECTION, AND ELECTRIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TEMPORARY STORAGE BUILDING NO. 776; FLOOR PLAN, SECTION, AND ELECTRIC LIGHTING SERVICE (Also includes a plot plan). Navy Yard, Mare Island, California. P.W. (Public Works) drawing no. 18048-1, approved May 5, 1942; file no. 776-CR-1. Various scales. Revised May 19, 1942. 42 cm x 72 cm. Pencil on velllum. - Mare Island Naval Shipyard, Temporary Storage, Railroad Avenue near Eighteenth Street, Vallejo, Solano County, CA

  15. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    SciTech Connect

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action.

  16. Action Planning Mediates Guidance of Visual Attention from Working Memory.

    PubMed

    Feldmann-Wüstefeld, Tobias; Schubö, Anna

    2015-01-01

    Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM) content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing) and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton) was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles), thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences. PMID:26171241

  17. Final record of decision/remedial action plan, nine sites, Sierra Army Depot, Lassen County, California

    SciTech Connect

    Arroyo, S.L.; Larson, A.M.; Parent, M.M.; Silvers, J.M.; Weaverling, P.H.

    1996-10-01

    This ROD/RAP presents the selected response actions for nine sites at SIAD. The response actions were selected by the US Department of the Army (Army) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments Reauthorization Act of 1986 (SARA)(collectively referred to as CERCLA), the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), and Section 6.8 of the California Health and Safety Code. This ROD/RAP includes the factual and legal basis for selecting the response action at each of the nine sites listed above. The data used to support the selected response action are contained in the Administrative Record for each site. The State of California as represented by the Department of Toxic Substances Control (DTSC), and the Lahontan Regional Water Quality Control Board (RWQCB) concur with the selected response action at each site.

  18. 42. Photograph of a line drawing. 'CROSS SECTION AND PLAN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. Photograph of a line drawing. 'CROSS SECTION AND PLAN LAYOUT OF PART I, SECTION 8, BUILDINGS NO. H-1 TO H-10 INCL., GRINDING, MANUFACTURING AREA, PLANT B AS OF 4-24-44.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (NashVille, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  19. 29. Photograph of a line drawing. 'CROSS SECTION AND PLAN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Photograph of a line drawing. 'CROSS SECTION AND PLAN LAYOUT OF PART I, SECTION 8, BUILDINGS NO. D-1 TO D-10 INCL., NITRATION, MANUFACTURING AREA, PLANT B AS OF 4-24-44.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  20. 34. Photograph of a line drawing. 'CROSS SECTION AND PLAN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photograph of a line drawing. 'CROSS SECTION AND PLAN LAYOUT OF PART I, SECTION B, BUILDINGS NO. E-1 TO E-10 INCL., WASHING, MANUFACTURING AREA, PLANT B AS OF 4-24-44.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  1. 29 CFR 1608.6 - Affirmative action plans which are part of Commission conciliation or settlement agreements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 4 2011-07-01 2011-07-01 false Affirmative action plans which are part of Commission conciliation or settlement agreements. 1608.6 Section 1608.6 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  2. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Reimbursement of costs incurred in accordance with a plan for subsequent remedial action. 765.30 Section 765.30 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional...

  3. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Reimbursement of costs incurred in accordance with a plan for subsequent remedial action. 765.30 Section 765.30 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional...

  4. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Reimbursement of costs incurred in accordance with a plan for subsequent remedial action. 765.30 Section 765.30 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional...

  5. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Reimbursement of costs incurred in accordance with a plan for subsequent remedial action. 765.30 Section 765.30 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional...

  6. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Reimbursement of costs incurred in accordance with a plan for subsequent remedial action. 765.30 Section 765.30 Energy DEPARTMENT OF ENERGY REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional...

  7. Planned caesarean section for women with a twin pregnancy

    PubMed Central

    Hofmeyr, G Justus; Barrett, Jon F; Crowther, Caroline A

    2014-01-01

    Background Twin pregnancies are associated with increased perinatal mortality, mainly related to prematurity, but complications during birth may contribute to perinatal loss or morbidity. The option of planned caesarean section to avoid such complications must therefore be considered. On the other hand, randomised trials of other clinical interventions in the birth process to avoid problems related to labour and birth (planned caesarean section for breech, and continuous electronic fetal heart rate monitoring), have shown an unexpected discordance between short-term perinatal morbidity and long-term neurological outcome. The risks of caesarean section for the mother in the current and subsequent pregnancies must also be taken into account. Objectives To determine the short- and long-term effects on mothers and their babies, of planned caesarean section for twin pregnancy. Search methods We searched the Cochrane Pregnancy and Childbirth Group’s Trials Register (30 September 2011). Selection criteria Randomised trials comparing a policy of caesarean section with planned vaginal birth for women with twin pregnancy. Data collection and analysis Two researchers independently assessed eligibility, quality and extracted data. Data were checked for accuracy. Main results One small trial with unconfirmed allocation concealment compared caesarean section with planned vaginal birth in 60 women with vertex/non-vertex twin pregnancies. There were no differences in perinatal outcome. The trial was too small to exclude the possibility of clinically meaningful benefits of either approach. There is one additional trial currently ongoing. Authors’ conclusions There is a lack of robust evidence to guide clinical advice regarding the method of birth for twin pregnancies. Women should be informed of possible benefits and risks of either approach, including short-term and long-term consequences for both mother and babies. Future research should aim to provide unbiased evidence

  8. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  9. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  10. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  11. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  12. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  13. 8. Historic plan, section, elevation, and detail drawing of Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Historic plan, section, elevation, and detail drawing of Building 206, August 26, 1968. NASA GRC drawing number CE-101188 (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 206, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  14. 58. Historic plan, section, and detail drawing of Building 202 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. Historic plan, section, and detail drawing of Building 202 test cell, June 29, 1955. NASA GRC drawing no. CE-101340 (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  15. 28. PLANS AND SECTIONS OF POWERHOUSE. SANTA ANA NO. 3, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. PLANS AND SECTIONS OF POWERHOUSE. SANTA ANA NO. 3, EXHIBIT L, JAN. 25, 1956 (SHEET 8; FOR FILING WITH FEDERAL POWER COMMISSION). SCE drawing no. 541729. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  16. 30. PLAN AND SECTIONS SHOWING INSTALLATION OF HYDRAULIC TURBINE UNIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. PLAN AND SECTIONS SHOWING INSTALLATION OF HYDRAULIC TURBINE UNIT FROM KAWEAH NO. 2 REPLACING EXISTING UNIT, SANTA ANA RIVER NO. 3, JUNE 21, 1945. SCE drawing no. 523126-1. - Santa Ana River Hydroelectric System, SAR-3 Powerhouse, San Bernardino National Forest, Redlands, San Bernardino County, CA

  17. East Lawn Site and Planting Plan with Section Oklahoma ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    East Lawn Site and Planting Plan with Section - Oklahoma City Civic Center, Bounded by N. Shartel Avenue to the West, N. Hudson Avenue to the East, Couch Drive to the North, and Colcord Drive to the South, Oklahoma City, Oklahoma County, OK

  18. 8. PHOTOCOPY OF ENGINEERING DRAWING: "PLAN, PROFILE, AND TYPICAL SECTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. PHOTOCOPY OF ENGINEERING DRAWING: "PLAN, PROFILE, AND TYPICAL SECTION OF FINISHED SUBGRADE READY FOR TRAFFIC BOUND SURFACING OF SLAG, CONTRACT 274A, HIGHWAY DEPARTMENT, DELAWARE, BRIDGE AND ROADWAY, SAWMILL BRANCH, AUGUST 1934." Original on file at Delaware Department of Transportation, Dover. - State Bridge No. 456, Walker School Road (Road 45), spanning Sawmill Branch, Townsend, New Castle County, DE

  19. 36. 'Firing Pier, First Floor Plan, Section No. 1,' submitted ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. 'Firing Pier, First Floor Plan, Section No. 1,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3862-46, Y&D Drawing 190836. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI

  20. 39. 'Firing Pier, First Floor Plan, Section No. 4,' submitted ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. 'Firing Pier, First Floor Plan, Section No. 4,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3865-46, Y&D Drawing 190839. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI

  1. 42. 'Firing Pier, Second Floor Plan, Section No. 3,' submitted ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. 'Firing Pier, Second Floor Plan, Section No. 3,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3868-46, Y&D Drawing 190842. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI

  2. FIRE STATION AND GUARD HOUSE, ELEVATIONS, SECTIONS, AND DETAILS. Plan ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRE STATION AND GUARD HOUSE, ELEVATIONS, SECTIONS, AND DETAILS. Plan No. 6754-320, dated August 1, 1933. Constructing Division, Office of the Constructing Quartermaster - Hamilton Field, Fire Station & Guard House, Southwest corner of Seventh Street & Hangar Avenue, Novato, Marin County, CA

  3. 38. 'Firing Pier, First Floor Plan, Section No. 3,' submitted ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. 'Firing Pier, First Floor Plan, Section No. 3,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3864-46, Y&D Drawing 190838. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI

  4. 40. 'Firing Pier, Second Floor Plan, Section No. 1,' submitted ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. 'Firing Pier, Second Floor Plan, Section No. 1,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3866-46, Y&D Drawing 190840. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI

  5. 37. 'Firing Pier, First Floor Plan, Section No. 2,' submitted ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. 'Firing Pier, First Floor Plan, Section No. 2,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3863-46, Y&D Drawing 190837. Scale 1/4' = 1. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI

  6. 41. 'Firing Pier, Second Floor Plan, Section No. 2,' submitted ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. 'Firing Pier, Second Floor Plan, Section No. 2,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3867-46, Y&D Drawing 190841. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI

  7. 16. INTAKE PIER, PLANS ELEVATIONS, AND SECTIONS, SHEETS 5 OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. INTAKE PIER, PLANS ELEVATIONS, AND SECTIONS, SHEETS 5 OF 117, 1920. - Sacramento River Water Treatment Plant Intake Pier & Access Bridge, Spanning Sacramento River approximately 175 feet west of eastern levee on river; roughly .5 mile downstream from confluence of Sacramento & American Rivers, Sacramento, Sacramento County, CA

  8. 21. COMPLETION OF INTAKE CONDUITS REVISED, PIPE SECTIONS AND PLANS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. COMPLETION OF INTAKE CONDUITS REVISED, PIPE SECTIONS AND PLANS, SHEET 117 OF 117, 1922. - Sacramento River Water Treatment Plant Intake Pier & Access Bridge, Spanning Sacramento River approximately 175 feet west of eastern levee on river; roughly .5 mile downstream from confluence of Sacramento & American Rivers, Sacramento, Sacramento County, CA

  9. 6. Photographic copy of original construction drawing, FOUNDATION PLAN, SECTIONS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of original construction drawing, FOUNDATION PLAN, SECTIONS AND GENERAL NOTED, SHEET 6 OF 11, DRAWING NO. 35-03-05 SF 5/1673, U.S. Army Engineer District, Detroit, Corps of Engineers, 9 June, 1959, on file Selfridge Base Museum. - Selfridge Field, Building No. 1041, West of E Street, north of D Street, Mount Clemens, Macomb County, MI

  10. 40 CFR 52.1281 - Original identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... prevention of significant deterioration of air quality as required by 40 CFR 51.166 and 52.21. (i..., Appendix C; addition of testing methods, section 8, Appendix C; addition of Permit System, Appendix G and... 10, 1980). (13) Air Quality Surveillance Plan, submitted on June 1, 1982, by the...

  11. 40 CFR 52.1281 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... prevention of significant deterioration of air quality as required by 40 CFR 51.166 and 52.21. (i..., Appendix C; addition of testing methods, section 8, Appendix C; addition of Permit System, Appendix G and... 10, 1980). (13) Air Quality Surveillance Plan, submitted on June 1, 1982, by the...

  12. Photocopy of Drawing of Transverse Section and Floor Plan, dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of Drawing of Transverse Section and Floor Plan, dated 17 May 1949. Original drawing located at Public Works Center, Drawings and Map Vault, Building 166, Washington Navy Yard, Washington D.C. - Navy Yard, Building No. 28, Between Isaac Hill & Patterson Avenues, Washington, District of Columbia, DC

  13. 40 CFR 52.1837 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 1980, the Governor submitted a plan revision to meet the requirements of Air Quality Monitoring 40 CFR... for implementation and enforcement of the New Source Performance Standards (NSPS) for 40 CFR part 60... Register citations affecting § 52.1820, see the List of CFR Sections Affected, which appears in the...

  14. PLAN AND SECTION. WELLTONMOHAWK PUMPING PLANT NO. 3. WELLTONMOHAWK CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLAN AND SECTION. WELLTON-MOHAWK PUMPING PLANT NO. 3. WELLTON-MOHAWK CANAL - STA. 972-64.99. United States Department of the Interior, Bureau of Reclamation; Gila Project, Arizona, Wellton-Mohawk Division. Drawing No. 50-D-2385, dated June 30, 1948, Denver, Colorado - Wellton-Mohawk Irrigation System, Pumping Plant No. 3, South of Interstate 8, Wellton, Yuma County, AZ

  15. IET exhaust gas stack. Section, west elevation, foundation plan, access ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET exhaust gas stack. Section, west elevation, foundation plan, access ladder, airplane warning light. Ralph M. Parsons 902-5-ANP-712-S 433. Date: May 1954. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0712-60-693-106984 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  16. 30. Photocopy of blueprint. PLAN, ELEVATION, END SECTION, DETAIL OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Photocopy of blueprint. PLAN, ELEVATION, END SECTION, DETAIL OF DECK SYSTEM AND LOAD COMPUTATION. Preparer unknown, date unknown, but probably ca. 1932. (Original in possession of the Washington County Highway Department.) - Hegeman-Hill Street Bridge, Spanning Batten Kill, .65 mile West of Greenwich, Easton, Washington County, NY

  17. Shelving plans, elevations, and sections. San Bernardino Valley Union Junior ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Shelving plans, elevations, and sections. San Bernardino Valley Union Junior College, Science Building. Howard E. Jones, Architect, San Bernardino, California. Sheet 9, job no. 311. Scale 1.2 inch to the foot. February 15, 1927. - San Bernardino Valley College, Life Science Building, 701 South Mount Vernon Avenue, San Bernardino, San Bernardino County, CA

  18. South entrance, plan, section, & detail. San Bernardino Valley Union ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    South entrance, plan, section, & detail. San Bernardino Valley Union Junior College, Science Building. Detailed drawings of tile work, wrought iron, and art stone, Howard E. Jones, Architect, San Bernardino, California. Sheet 6, job no. 311. Scale 1.2 inch to the foot. February 15, 1927. - San Bernardino Valley College, Life Science Building, 701 South Mount Vernon Avenue, San Bernardino, San Bernardino County, CA

  19. 28. Photograph of a line drawing. 'ARCHITECTURAL FLOOR PLANS, SECTIONS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Photograph of a line drawing. 'ARCHITECTURAL FLOOR PLANS, SECTIONS & ELEVATIONS, BUILDING C, PLANT B.' Holston Ordnance Works, Tennessee Eastman Corporation. July 7, 1942. Delineator: F. F. Stone. Drawing # 7651-1003.001. - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  20. 19. PLAN AND SECTION DRAWINGS OF ELECTRICAL SWITCH GEAR, BUSES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. PLAN AND SECTION DRAWINGS OF ELECTRICAL SWITCH GEAR, BUSES AND OTHER EQUIPMENT, AS INSTALLED IN POWERHOUSE Switchboard and Low Tension Bus Structure, drawing E1703. Drawn by L. M. Brown for the Washington Water Power Company, March 15, 1924. - Enloe Dam, Power House, On Similkameen River, Oroville, Okanogan County, WA

  1. PLAN SECTIONS AND ELEVATIONS OF VESSEL SAMPLING STATIONS "P", "Q", ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLAN SECTIONS AND ELEVATIONS OF VESSEL SAMPLING STATIONS "P", "Q", "S" CELLS MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-053694. ALTERNATE ID NUMBER CPP-E-1394. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  2. PLAN SECTIONS AND DETAILS OF CELL HATCHES MAIN PROCESSING BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLAN SECTIONS AND DETAILS OF CELL HATCHES MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-103256. ALTERNATE ID NUMBER 542-11-F-302. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  3. Elevations, plan and section PP of main entrance. San Bernardino ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Elevations, plan and section PP of main entrance. San Bernardino Valley Union Junior College, Library Building. Howard E. Jones, Architect, San Bernardino, California. Sheet 9, job no. 315. Scale 1/2 inch to the foot. No date given on sheet (probably March or April, 1927). - San Bernardino Valley College, Library, 701 South Mount Vernon Avenue, San Bernardino, San Bernardino County, CA

  4. Commonwealth of the Northern Mariana Islands Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  5. 29 CFR 1607.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Policy statement on affirmative action (see section 13B... affirmative action (see section 13B). The Equal Employment Opportunity Coordinating Council was established by... policies concerning the role of affirmative action in the overall equal employment opportunity...

  6. 29 CFR 1607.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Policy statement on affirmative action (see section 13B... affirmative action (see section 13B). The Equal Employment Opportunity Coordinating Council was established by... policies concerning the role of affirmative action in the overall equal employment opportunity...

  7. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  8. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    USGS Publications Warehouse

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  9. Information architecture: Standards adoption and retirement process service action plan

    SciTech Connect

    1997-03-01

    The purpose of this Service Action Plan is to announce, as well as provide, a high-level outline of a new Departmental process for the adoption and retirement of information technology standards. This process supports the implementation of a Department of Energy (DOE) Information Architecture. This plan was prepared with the Department of Energy information technology standards customers and stakeholders in mind. The process described in this plan will be serviced primarily by staff from the Office of the Deputy Assistant Secretary for Information Management with assistance from designated program and site Information Technology Standards Points of Contact. We welcome any comments regarding this new Departmental process and encourage the proposal of information technology standards for adoption or retirement.

  10. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation

  11. 15 CFR 2006.0 - Submission of petitions requesting action under section 301.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Submission of petitions requesting action under section 301. 2006.0 Section 2006.0 Commerce and Foreign Trade Regulations Relating to... FOR ACTION UNDER SECTION 301 OF THE TRADE ACT OF 1974, AS AMENDED § 2006.0 Submission of...

  12. 37. Roof Plan, Ground Floor Plan, Sections,and Details. Addition to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Roof Plan, Ground Floor Plan, Sections,and Details. Addition to Bacteriology Laboratory at Letterman General Hospital, San Francisco, Cal. June 1915. BUILDING 1006. - Presidio of San Francisco, Letterman General Hospital, Building No. 27, Letterman Hospital Complex, Edie Road, San Francisco, San Francisco County, CA

  13. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    SciTech Connect

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the Corrective Action Unit No. 426, which includes the Cactus Spring Waste Trenches, located at the Tonopah Test Range. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action. The scope of this investigation will include drilling and collecting subsurface samples from within and below the trenches. Sampling locations will be biased toward the areas most likely to be contaminated. The Cactus Spring Waste Trenches Site is identified as one of three potential locations for buried, radioactively contaminated materials from the Double Tracks Test. This test was the first of four storage-transportation tests conducted in 1963 as part of Operation Roller Coaster. The experiment involved the use of live animals to assess the inhalation intake of a plutonium aerosol.

  14. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    SciTech Connect

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  15. Action Plan for updated Chapter 15 Accident Analysis in the SRS Production Reactor SAR

    SciTech Connect

    Hightower, N.T. III; Burnett, T.W.

    1989-11-15

    This report describes the Action Plan for the upgrade of the Chapter 15 Accident Analysis in the SRS Production Reactor SAR required for K-Restart. This Action Plan will be updated periodically to reflect task accomplishments and issue resolutions.

  16. Workshop on the preparation of climate change action plans. Workshop summary

    SciTech Connect

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  17. Sections. Ceiling plan. San Bernardino Valley Union Junior College, Auditorium ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Sections. Ceiling plan. San Bernardino Valley Union Junior College, Auditorium Building. G. Stanley Wilson, Architect, A.I.A., Riverside, California. Sheet 9, job no. 692. Scale 1/8 inch to the foot. March 27, 1936. Application no. 1446, approved by the State of California, Department of Public Works, Division of Architecture, April 22, 1936. - San Bernardino Valley College, Auditorium, 701 South Mount Vernon Avenue, San Bernardino, San Bernardino County, CA

  18. 15. "FIRING CONTROL BLOCKHOUSE; STATION '0' AREA; PLAN, AND SECTIONS." ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. "FIRING CONTROL BLOCKHOUSE; STATION '0' AREA; PLAN, AND SECTIONS." Specifications No. ENG-04-353-57-75; Drawing No. AF-60-09-15; sheet 40 of 96; D.O. Series No. AF 1394/60, Rev. A. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 5296 Rev. A, Date: 11/17/59. - Edwards Air Force Base, South Base Sled Track, Firing Control Blockhouse, South of Sled Track at east end, Lancaster, Los Angeles County, CA

  19. 14. "FIRING CONTROL BLOCKHOUSE; STATION '0' AREA; PLAN, ELEVATIONS, SECTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. "FIRING CONTROL BLOCKHOUSE; STATION '0' AREA; PLAN, ELEVATIONS, SECTION, DETAIL AND SCHED." Specifications No. ENG-04-353-57-75; Drawing No. AF-60-09-15; sheet 21 of 96; D.O. Series No. AF 1394/39, Rev. A. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 5296 Rev. A, Date: 11/17/59. - Edwards Air Force Base, South Base Sled Track, Firing Control Blockhouse, South of Sled Track at east end, Lancaster, Los Angeles County, CA

  20. 1. 1943 Plan View of 'Fort Lewis Station Hospital, Section ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. 1943 Plan View of 'Fort Lewis Station Hospital, Section No. 5.' Drawn by V. Steinbrueck for J.C. Boespflug Construction Co. July 23, 1943. HABS 8x10' negative was made from an 8.5 x 11' copy on card stock in the collection of the Community Library, Madigan Army Medical Center, Fort Lewis, WA. - Madigan Hospital, Bounded by Wilson & McKinley Avenues & Garfield & Lincoln Streets, DuPont, Pierce County, WA

  1. GENERAL PLANS AND SECTIONS. WASTEWAY NO. 1. WELLTONMOHAWK CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL PLANS AND SECTIONS. WASTEWAY NO. 1. WELLTON-MOHAWK CANAL - STA. 99+23.50. United States Department of the Interior, Bureau of Reclamation; Gila Project, Arizona, Wellton-Mohawk Division. Drawing No. 50-D-2422, dated January 19, 1949, Denver Colorado - Wellton-Mohawk Irrigation System, Wasteway No. 1, Wellton-Mohawk Canal, North side of Wellton-Mohawk Canal, bounded by Gila River to North & the Union Pacific Railroad & Gila Mountains to south, Wellton, Yuma County, AZ

  2. PLAN AND SECTION, WELLTONMOHAWK PUMPING PLANT NO. 2. WELLTONMOHAWK CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLAN AND SECTION, WELLTON-MOHAWK PUMPING PLANT NO. 2. WELLTON-MOHAWK CANAL - STA. 717+62.95. United States Department of the Interior, Bureau of Reclamation; Gila Project, Arizona, Wellton-Mohawk Division. Drawing No. 50-D-2378, dated June 30, 1948, Denver Colorado - Wellton-Mohawk Irrigation System, Pumping Plant No. 2, Bounded by Interstate 8 to south, Wellton, Yuma County, AZ

  3. PLAN AND SECTION. WELLTONMOHAWK PUMPING PLANT NO. 1 WELLTONMOHAWK CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLAN AND SECTION. WELLTON-MOHAWK PUMPING PLANT NO. 1 WELLTON-MOHAWK CANAL - STA. 452+32. United States Department of the Interior, Bureau of Reclamation; Gila Project, Arizona, Wellton-Mohawk Division. Drawing No. 50-D-2368, dated June 30, 1948, Denver, Colorado. - Wellton-Mohawk Irrigation System, Pumping Plant No. 1, Bounded by Gila River & Union Pacific Railroad, Wellton, Yuma County, AZ

  4. 9. "TEST STAND; STRUCTURAL; CABLE TUNNEL, PLAN, SECTIONS, DETAILS." Specifications ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. "TEST STAND; STRUCTURAL; CABLE TUNNEL, PLAN, SECTIONS, DETAILS." Specifications No. OC1-55-72-(Rev.); Drawing No. 60-09-12; sheet 43 of 148; file no. AF 1320/94, Rev. A. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-A Terminal Room, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA

  5. PLANS AND SECTIONS. WEIR SPILLWAY. TEXAS HILL CANAL STA. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLANS AND SECTIONS. WEIR SPILLWAY. TEXAS HILL CANAL - STA. 132+82.15. TEXAS HILL CANAL AND DISTRIBUTION SYSTEM. United States Department of Interior, Bureau of Reclamation; Gila Project, Arizona, Wellton-Mohawk Division. Drawing No. 50-D-3200, dated February 7, 1955, Denver, Colorado - Wellton-Mohawk Irrigation System, Relift Station, Texas Hill Canal 2.5, Northern Terminus of Avenue 51 East, approximately .5 mile south of Union Pacific Railroad, Wellton, Yuma County, AZ

  6. Planning perception and action for cognitive mobile manipulators

    NASA Astrophysics Data System (ADS)

    Gaschler, Andre; Nogina, Svetlana; Petrick, Ronald P. A.; Knoll, Alois

    2013-12-01

    We present a general approach to perception and manipulation planning for cognitive mobile manipulators. Rather than hard-coding single purpose robot applications, a robot should be able to reason about its basic skills in order to solve complex problems autonomously. Humans intuitively solve tasks in real-world scenarios by breaking down abstract problems into smaller sub-tasks and use heuristics based on their previous experience. We apply a similar idea for planning perception and manipulation to cognitive mobile robots. Our approach is based on contingent planning and run-time sensing, integrated in our knowledge of volumes" planning framework, called KVP. Using the general-purpose PKS planner, we model information-gathering actions at plan time that have multiple possible outcomes at run time. As a result, perception and sensing arise as necessary preconditions for manipulation, rather than being hard-coded as tasks themselves. We demonstrate the e ectiveness of our approach on two scenarios covering visual and force sensing on a real mobile manipulator.

  7. Action planning in sequential skills: relations to music performance.

    PubMed

    Keller, Peter E; Koch, Iring

    2008-02-01

    The hypothesis that planning music-like sequential actions involves anticipating their auditory effects was investigated in a series of experiments. Participants with varying levels of musical experience responded to each of four colour-patch stimuli by producing a unique sequence of three taps on three vertically aligned keys. Each tap triggered a tone in most experimental conditions. Response--effect (key-to-tone) mapping was either compatible--taps on the top, middle, and bottom keys triggered high, medium, and low pitched tones, respectively--or incompatible--key-to-tone mapping was scrambled, reversed, or neutral (taps on different keys triggered the same tone). The results suggest that action planning was faster with compatible than with incompatible mappings (and faster than with no tones). Furthermore, the size of this compatibility effect grew with increasing musical experience, which suggests that improvements in auditory imagery ability that typically accompany musical training may augment the role of anticipatory auditory-effect representations during planning. PMID:17853237

  8. Corrective Action Plan for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada

    SciTech Connect

    Bechtel Nevada

    1998-09-30

    This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that the landfill cells were used for solid waste disposal, including disposal of UXO.

  9. Technical Support Section annual work plan for FY 1995

    SciTech Connect

    Adkisson, B.P.; Hess, R.A.; Kunselman, C.W.; Millet, A.J.; Smelcer, D.R.

    1994-10-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Work performed by TSS is in support of basic and applied research and development (R and D), engineering, and instrument and computer systems managed by ORNL. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from and driven directly by current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts and the establishment of new facilities or environmental safety and health programs. The ``Long-Range Work Plan`` is based on estimates of impact of the long-range priorities and directions of the Laboratory. Identifiable proposed new facilities and programs provide additional basis for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new-hires, and identification of essential test equipment needed in new work.

  10. Technical Support Section annual work plan for FY 1998

    SciTech Connect

    Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.

    1997-12-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and is driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS collects information concerning the projected funding levels of programs and facilities it supports. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. Each year, TSS sets the standard hourly charge rate for the following fiscal year. The Long-Range Work Plan is based on estimates of the affects of the long-range priorities and directions of the Laboratory. Proposed new facilities and programs provide additional bases for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new hires, and identification of essential test equipment that will be needed for new work.

  11. Practice in Planning and Planning in Practice: Re-Assessing and Clarifying Action Research in a Multi-National Context

    ERIC Educational Resources Information Center

    Kusch, Jim; Rebolledo, Geisha; Ryan, Charly

    2005-01-01

    This paper responds to a call seeking presenters for an action-research event for elementary-school science teachers in Venezuela. The authors planned on the assumption that the participants would wish to leave with plans for introducing action-research approaches into their practice. In previous writing on action research, the various protocols…

  12. Planning for primary health care: the case of the Sierra Leone National Action Plan.

    PubMed

    Decosas, J

    1990-01-01

    The National Action Plan for Primary Health Care, a planning document of the Sierra Leonean Ministry of Health for the restructuring of the country's rural health services, is analyzed in its social, economic, and historical context. It appears to be an attempt of the national government to gain control over the highly devolved health care delivery system, but the state has neither the political will nor the power to achieve this goal. The utility of the document is therefore in doubt, which raises two important questions: Whose interests does this plan serve, and at whose cost? PMID:2307554

  13. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  14. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  15. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 2 2013-07-01 2013-07-01 false What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  16. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  17. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 2 2012-07-01 2012-07-01 false What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals...

  18. Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children

    ERIC Educational Resources Information Center

    Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert

    2013-01-01

    The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…

  19. Flexible and Inexpensive: Improving Learning Transfer and Program Evaluation through Participant Action Plans

    ERIC Educational Resources Information Center

    Cowan, Chris A.; Goldman, Ellen F.; Hook, Melissa

    2010-01-01

    Action plans have been shown to improve transfer of learning and have proven an effective tool in training evaluation. This study describes how action planning was simply and successfully adapted to a preexisting curriculum with few additional resources. The decision to use participant action planning, the administration of it, and the…

  20. Report of the Tape Recorder Action Plan Committee, 21 March 1972

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A NASA/AF Tape Recorder Action Plan Committee was formed in January 1972 to investigate tape recorder problems and to recommend an action plan to NASA management. The committee collected data on tape recorder failure history, pinpointed problem areas, discussed needed technical and management changes, and proposed an action plan for the recommended approaches.

  1. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 4 2014-07-01 2014-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action...

  2. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action...

  3. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action...

  4. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 4 2012-07-01 2012-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action...

  5. The scaup conservation action plan: working toward coherence

    USGS Publications Warehouse

    Austin, Jane E.

    2010-01-01

    The last in a series of three workshops to develop a decision framework for the scaup conservation action plan was conducted in September 2009. Fifteen waterfowl biologists and managers met in Memphis, Tennessee at the Ducks Unlimited Headquarters to review and refine the decision statement, objectives, and prototype model for the continental scaup population, with a special focus on vital rate parameters that are affected during migration and winter. In a significant step toward coherence, the participants also developed models for incorporating human dimensions – hunters – into the decision framework, and to link the population of diving duck hunters with the continental scaup population.

  6. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    SciTech Connect

    Not Available

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  7. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Not Available

    1992-10-01

    The Uranium Mill Tallings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1 (Chapter 3, paragraph 2). The UMTRA EPIP covers the time period of November 9, 1992, through November 8, 1993. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  8. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    SciTech Connect

    Not Available

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section}7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  9. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  10. The Representation of Action Plans in Long Term Memory

    NASA Technical Reports Server (NTRS)

    Fussfeld, G. N.; Koenig, W.; Karis, D.

    1984-01-01

    A sequence of experiments conducted on a two hand chord typewriter, to compare the efficiency of different coding principles employed to associate letters with their chord productions is described. This keyboard represents an effort to identify effective alternatives to the existing typewriter. It consists of two seperate 5-key panels (one for each hand), and letters are entered by typing chords composed of one to five fingers. Each panel is capable of producing the full alphabet. One group of experiments was designed to separate between perceptual and motor factors in the acivation of single letter chords. The results underline the importance of perceptual factors in the activation of motor plans. The complexity of the patterns employed to represent letters was shown to account for 50 percent of variance in the typing speeds of single letters. The theoretical implications of these results are discussed in relation to a vision based theory of action plans.

  11. Planning an Action: A Developmental Progression in Tool Use

    PubMed Central

    Keen, Rachel; Lee, Mei-Hua; Adolph, Karen

    2014-01-01

    How children pick up a tool reveals their ability to plan an action with the end goal in mind. When presented with a spoon whose handle points away from their dominant hand, children between infancy and 8 years of age progress from using an awkward ulnar grip that causes food to spill from the spoon to consistently using a radial grip. At 4 years of age children’s grip strategies are highly variable, including the awkward grips of infancy and use of the non-dominant hand, but they also employ adult-like grips never seen in infancy. By 8 years of age the infantile ulnar grip has completely disappeared and is replaced by more mature and effective grips that indicates better planning for the end goal. PMID:24954996

  12. 12 CFR 208.45 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... a capital restoration plan within the schedule established in this subpart (section 38(e)(2)); (iv... respect an acceptable capital restoration plan, the bank shall become subject to the provisions of section... issuing directives under 12 CFR 263.202 and 263.204, unless otherwise provided in section 38 or...

  13. 12 CFR 390.455 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... State savings association (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan... capital restoration plan, the State savings association shall become subject to the provisions of...

  14. Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    SciTech Connect

    T. M. Fitzmaurice

    2000-05-01

    This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

  15. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    ERIC Educational Resources Information Center

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  16. 42 CFR 430.16 - Timing and notice of action on State plan material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Timing and notice of action on State plan material... State Plans § 430.16 Timing and notice of action on State plan material. (a) Timing. (1) A State plan or... of any additional information it needs in order to make a final determination. (2) If CMS...

  17. 42 CFR 430.16 - Timing and notice of action on State plan material.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Timing and notice of action on State plan material... State Plans § 430.16 Timing and notice of action on State plan material. (a) Timing. (1) A State plan or... of any additional information it needs in order to make a final determination. (2) If CMS...

  18. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2009-03-31

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12

  19. Technical Support Section annual work plan for FY 1997

    SciTech Connect

    Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.

    1996-10-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I&C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Work performed by TSS is in support of basic and applied research and development (R&D), engineering, and instrument and computer systems managed by ORNL. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support such as reductions in the staffing levels. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS contacts ORNL division finance managers or division finance officers to obtain information concerning projected funding levels of programs and facilities they manage. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. The Long- Range Work Plan is based on estimates of impact of the long-range priorities and directions of the Laboratory. Identifiable proposed new facilities and programs provide additional basis for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, re-evaluation of qualifications for new hires, and identification of essential test equipment needed in new work.

  20. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Shiprock, New Mexico

    SciTech Connect

    Hill, T.V.; Morley, J.A. . Uranium Mill Tailings Remedial Action Project Office); Began, E.T. )

    1985-06-01

    This Remedial Action Plan (RAP) has been developed to serve a twofold purpose. It presents the series of activities which are proposed by the Department of Energy (DOE) to effect long-term control of radioactive materials at the inactive uranium processing site located on the Navajo Reservation at Shiprock, New Mexico. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Shiprock site. Detailed supporting information can be found in appendices and referenced documents. Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 traces the history of operations at the Shiprock site with a description of the present site characteristics. Section 4.0 provides a definition of site-specific problems, a listing of remedial action alternatives which have been considered, and the action which is being proposed. Section 5.0 presents a summary of the conceptual design for the proposed action which includes objectives, design features, schedule, cost, and implementation methods. Section 6.0 summarizes the plan for ensuring health and safety protection for the surrounding community and the onsite workers. Section 7.0 presents a detailed listing of the responsibilities of the project participants. Section 8.0 describes the quality assurance process that will be used by the RAC during construction. Section 9.0 describes the features of the long-term maintenance and surveillance plan. Section 10.0 documents the on-going activities to keep the public informed and participating in the project. Attached as part of the RAP are five appendices which describe in more detail various aspects of the remedial action.

  1. The limits of scientific planning: Doxiadis and the Tehran Action Plan.

    PubMed

    Madanipour, Ali

    2010-01-01

    Tehran after the Second World War experienced a modernization drive and rapid population growth. In 1972, the Greek planner, Constantinos Doxiadis, who had already undertaken major housing and planning projects in Iran, was invited to prepare an action plan for the city, to guide the future investment for easing the city's problems. Doxiadis saw cities as nightmares, but advocated that a holistic scientific analysis and a naturalist approach to urban growth management could address their problems. In applying his ideas to Tehran, however, the limits of his ideas of scientific planning became evident, not only through contextual pressures, such as lack of time and data, but also through the planning consultant's approach, in which commercial considerations and the application of readymade solutions could shape the outcome. Rather than working with the context, Doxiadis followed the modernist tenet of breaking with the past, proposing the creation of West Tehran, an alternative to the city where all future growth should take place on a utopian basis. The radical nature of his proposals, his death, and a turbulent revolution aborted the impact of his action plan on Tehran, while faith in modernist scientific planning was widely being abandoned. PMID:20857604

  2. Side Elevation, End Elevation, Cross Section, 1/2 Roof Plan, 1/2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Side Elevation, End Elevation, Cross Section, 1/2 Roof Plan, 1/2 Reflected Plan, 1/2 Floor Plan, 1/2 Reflected Plan - Jack's Mill Covered Bridge, Spanning Henderson Creek, Oquawka, Henderson County, IL

  3. Utility Building Plan, elevations and sections. March Air Force Base, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Utility Building Plan, elevations and sections. March Air Force Base, Riverside, California, COmbat Operations Center, Utility Building. By Moffatt and Nichol, Engineers, 122 West Fifth Street, Long Beach, California; for the Corps of Engineers, U.S. Army, Office of the District Engineer, Los Angeles, California. Drawing no. AW-60-02-03, sheet no. 57, approved March, 1962; specifications no. ENG-04-353-62-66; D.O. series AW 1596/57, Rev. "B"; file drawer 1290. Last revised 3 October 1966 "drawings updated." Various scales. 29 x 41 inches. pencil on paper - March Air Force Base, Strategic Air Command, Utility Building, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  4. National action plan to combat multidrug-resistant tuberculosis.

    PubMed

    1992-06-19

    At no time in recent history has tuberculosis (TB) been as great a concern as it is today. TB cases are on the increase, and the most serious aspect of the problem is the recent occurrence of outbreaks of multidrug-resistant (MDR) TB, which pose an urgent public health problem and require rapid intervention. A Task Force composed of representatives of many federal agencies has developed a National Action Plan for addressing this problem. The Task Force identified a number of objectives to be met if MDR-TB is to be successfully combatted. These objectives fall under the categories of a) surveillance and epidemiology--determining the magnitude and nature of the problem; b) laboratory diagnosis--improving the rapidity, sensitivity, and reliability of diagnostic methods for MDR-TB; c) patient management--effectively managing patients who have MDR-TB and preventing patients with drug-susceptible TB from developing drug-resistant disease; d) screening and preventive therapy--identifying persons who are infected with or at risk of developing MDR-TB and preventing them from developing clinically active TB; e) infection control--minimizing the risk of transmission of MDR-TB to patients, workers, and others in institutional settings; f) outbreak control; g) program evaluation--ensuring that TB programs are effective in managing patients and preventing MDR-TB; h) information dissemination/training and education; and i) research to provide new, more effective tools with which to combat MDR-TB. The Action Plan lays out a series of activities to be undertaken at the national level. For each category, the Plan presents statements of problems to be overcome, followed by a summary of the objective to be achieved and steps to be carried out. For each implementation step, responsibility is assigned to the appropriate organization and start-up dates are listed. PMID:1640920

  5. Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site

    SciTech Connect

    DOE /NV

    1998-11-01

    This Corrective Action Investigation Plan (CAIP) describes the US Department of Energy's (DOE's) continued environmental investigation of the subsurface Project Shoal Area (PSA) Corrective Action Unit (CAU) 447. The PSA is located in the Sand Springs Mountains in Churchill County, Nevada, about 48 kilometers (km) (30 miles [mi]) southeast of Fallon, Nevada. Project Shoal was part of the Vela Uniform Program which was conducted to improve the US' ability to detect, identify, and locate underground nuclear detonations. The test consisted of detonating a 12-kiloton nuclear device deep underground in granitic rock to determine whether seismic waves produced by an underground nuclear test could be differentiated from seismic waves produced by a naturally occurring earthquake. The test was a joint effort conducted by the US Atomic Energy Commission (AEC) and the US Department of Defense (DoD) in October 1963 (AEC, 1964).

  6. North Slope (Wahluke Slope) expedited response action cleanup plan

    SciTech Connect

    Not Available

    1994-02-01

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

  7. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    SciTech Connect

    DOE /NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  8. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 2, Revision 5

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs.

  9. Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    SciTech Connect

    DOE/NV

    1999-05-01

    This CAIP presents a plan to investigate the nature and extent of the contaminants of potential concern (COPCs) at CAU 135. The purpose of the corrective action investigation described in this CAIP is to: (1) Identify the presence and nature of COPCs; (2) Determine the location of radiological contamination within the vault and determine the extent of COPCs in the sump area and on the floor; and (3) Provide sufficient information and data to develop and evaluate appropriate corrective actions for CAS 25-02-01. This CAIP was developed using the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQOs) (EPA, 1994) process to clearly define the goals for collecting environmental data, to determine data uses, and to design a data collection program that will satisfy these uses. A DQO scoping meeting was held prior to preparation of this plan; a brief summary of the DQOs is presented in Section 3.4. A more detailed summary of the DQO process and results is included in Appendix A.

  10. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 1, Revision 5

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  11. 75 FR 9244 - Fungibility Plan and Follow-Up Reporting To Implement Section 901 on Voucher Funds for Displaced...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... Displaced Hurricane Katrina and Rita Families AGENCY: Office of the Chief Information Officer, HUD. ACTION... impacted by Hurricanes Katrina and Rita will submit a Notice of Intent and Section 901 Fungibility Plan to... Displaced by Hurricanes Katrina and Rita. OMB Approval Number: 2577-0245. Form Numbers: None. Description...

  12. [International and Israeli physicians' health--information and action plan].

    PubMed

    Reis, Shmuel; Sayag, Shlomit; Karkabi, Khalid; Alroi, Gideon

    2008-03-01

    Physician health is a matter of interest for patients' physicians and their teams, managers and policy-makers. It has an impact on public health, physician impairment, patient safety, resource allocation and malpractice litigation. International medical literature, unlike Israel publications, is extensively preoccupied with the domain. Based on 2 MD thesis dissertations, Ministry of Health data and a literature search, the present review addresses many issues. It deals with: physicians' physical and mental health internationally and in Israel, prevention and health promotion, burn-out, the professional lifespan and career, health services utilization, legal and administrative aspects, boundaries, physicians' characteristics and vulnerability, interpersonal relations, care provided by physicians, physicians as patients and finally the impaired physician. International recommendations as well as a proposal for a local action plan are presented. PMID:18488866

  13. 43 CFR 1610.5-7 - Situations where action can be taken based on another agency's plan, or a land use analysis.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... on another agency's plan, or a land use analysis. 1610.5-7 Section 1610.5-7 Public Lands: Interior... action can be taken based on another agency's plan, or a land use analysis. These regulations authorize.... The Field Manager may use the plans or the land use analysis of other agencies when split or...

  14. 43 CFR 1610.5-7 - Situations where action can be taken based on another agency's plan, or a land use analysis.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... on another agency's plan, or a land use analysis. 1610.5-7 Section 1610.5-7 Public Lands: Interior... action can be taken based on another agency's plan, or a land use analysis. These regulations authorize.... The Field Manager may use the plans or the land use analysis of other agencies when split or...

  15. 43 CFR 1610.5-7 - Situations where action can be taken based on another agency's plan, or a land use analysis.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... on another agency's plan, or a land use analysis. 1610.5-7 Section 1610.5-7 Public Lands: Interior... action can be taken based on another agency's plan, or a land use analysis. These regulations authorize.... The Field Manager may use the plans or the land use analysis of other agencies when split or...

  16. 43 CFR 1610.5-7 - Situations where action can be taken based on another agency's plan, or a land use analysis.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... on another agency's plan, or a land use analysis. 1610.5-7 Section 1610.5-7 Public Lands: Interior... action can be taken based on another agency's plan, or a land use analysis. These regulations authorize.... The Field Manager may use the plans or the land use analysis of other agencies when split or...

  17. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona

    SciTech Connect

    Not Available

    1989-08-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site near Tuba City, Arizona. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the Navajo Nation, the Hopi Tribe, US Bureau of Indian Affairs (BIA), and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE, the Navajo Nation, and the Hopi Tribe, and concurrence by NRC, becomes Appendix B of the Cooperative Agreement. Following the introduction, contents are as follows: Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 summarizes the plan for ensuring environmental, health, and safety protection for the surrounding community and the on-site workers. Section 6.0 presents a detailed listing of the responsibilities of the project participants. Section 7.0 describes the features of the long-term surveillance and maintenance plan. Section 8.0 presents the quality assurance aspects of the project. Section 9.0 documents the ongoing activities to keep the public informed and participating in the project.

  18. 75 FR 60759 - Enforcement Action Plan for Promotion and Advertising Restrictions; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ...The Food and Drug Administration (FDA) is announcing the availability of a document entitled ``Enforcement Action Plan for Promotion and Advertising Restrictions'' (Enforcement Action Plan), which describes FDA's plan to enforce the restrictions on promotion and advertising of menthol and other cigarettes to youth and other requirements relating to tobacco product promotion and advertising......

  19. A School Action Plan with Stakeholder Involvement: A Case Study of One Elementary School

    ERIC Educational Resources Information Center

    Getty, Jacob J., Jr.

    2011-01-01

    This case study focused on a school action plan, using a planning and implementation process that focused on improving stakeholder involvement and responsibility for student reading achievement at Eisenberg Elementary School. This study examined the impact of the school action process on the development of a new plan compared to other traditional…

  20. Cool Campus! A How-To Guide for College and University Climate Action Planning

    ERIC Educational Resources Information Center

    Simpson, Walter

    2009-01-01

    While a number of excellent campus climate planning resources are available, this guide attempts to fill a gap by providing an abundance of "how-to" information. The goal of the guide is to assist climate action planning teams at schools that are well versed in campus climate issues and well along in the CAP (Climate Action Planning) process as…

  1. Group Action Planning As a Support Strategy for Hispanic Families: Parent and Professional Perspectives.

    ERIC Educational Resources Information Center

    Blue-Banning, Martha J.; Turnbull, Ann P.; Pereira, Lourdes

    2000-01-01

    Thirty-eight Hispanic parents of children (ages 6-26) with developmental disabilities and 22 professionals participated in focus group interviews on group action planning. Both constituency groups identified advantages and disadvantages to group action planning. Parents indicated this type of planning process could increased the quality and…

  2. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  3. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 8 2013-10-01 2013-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  4. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 8 2012-10-01 2012-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  5. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 8 2011-10-01 2011-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  6. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 8 2014-10-01 2014-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  7. Water Planning and Climate Change: Actionable Intelligence Yet?

    NASA Astrophysics Data System (ADS)

    Milly, P.

    2008-05-01

    alternative. What is to be done? Is climate-change information of sufficient strength to justify making decisions that differ from those that would be optimal under stationarity? I.e., does climate science provide "actionable intelligence" to water planners? A conservative approach to planning in the presence of climate change would begin with stationarity as a base and then superpose, with quantitative estimates of uncertainties, those model-projected changes that appear to be qualitatively robust. The current state of science suggests that the following changes could be considered robust: (1) reduction in the fraction of precipitation falling as snow and earlier seasonal melting of snow, with consequent seasonal redistribution of runoff and streamflow; (2) gradual sea-level rise with heightened risk of encroachment of saline water into coastal surface- and ground-water-supply sources; and (3) global redistribution of precipitation and resultant runoff, with regional focal points ("hot spots") of desiccation and moistening. Even considering the attendant uncertainties, the available information about these changes can significantly affect the cost-benefit-risk tradeoffs of existing and prospective water projects and, therefore, can rationally inform decisions about future courses of action or inaction.

  8. 3. "TEST STAND NO. 13, EXCAVATION PLAN & SECTIONS." Specifications ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. "TEST STAND NO. 1-3, EXCAVATION PLAN & SECTIONS." Specifications No. ENG 04-353-50-10; Drawing No. 60-0906; no sheet number within title block; D.O. SERIES 1109/10. Stamped: AS BUILT. No revisions or revision dates. Last work date on this drawing "Checked by EAG, 1/31/49." Though this drawing is specific to Test Stand 1-3, it also illustrates the general methods used for excavation design and retaining wall construction at Test Stand 1-5. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-3, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  9. 24 CFR 248.221 - Approval of a plan of action that involves termination of low income affordability restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... involves termination of low income affordability restrictions. 248.221 Section 248.221 Housing and Urban... LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES PREPAYMENT OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income Preservation Act of...

  10. Smoking cessation in cardiac patients: the influence of action plans, coping plans and self-efficacy on quitting smoking.

    PubMed

    de Hoog, Natascha; Bolman, Catherine; Berndt, Nadine; Kers, Esther; Mudde, Aart; de Vries, Hein; Lechner, Lilian

    2016-06-01

    Smoking cessation is the most effective action for cardiac patients who smoke to improve their prognosis, yet more than one-half of cardiac patients continue to smoke after hospital admission. This study examined the influence of action plans, coping plans and self-efficacy on intention to quit and smoking cessation in cardiac patients. Cardiac patients completed a baseline questionnaire (N = 245) assessing demographic characteristics, smoking behavior, intention, self-efficacy, relapse self-efficacy and action and coping plans. Six months later (N = 184) continued abstinence from smoking was assessed. Self-efficacy predicted intention to quit smoking and was an indirect predictor of continued abstinence, through intention. Intention to quit smoking and making action plans both directly influenced continued abstinence. Future interventions to facilitate smoking cessation in cardiac patients should put strong emphasis on enhancing self-efficacy and on making specific action plans to increase the likelihood of smoking cessation. PMID:26827369

  11. A Three Step Plan for Implementing an Affirmative Action Program

    ERIC Educational Resources Information Center

    Hilaael, Timothy M.

    1976-01-01

    (1) Centralize organizational responsibility for affirmative action. (2) Conduct an organizational audit related to the Equal Employment Opportunity Act. (3) Implement affirmative action as an administrative responsibility. (Author)

  12. The sequential encoding of competing action goals involves dynamic restructuring of motor plans in working memory.

    PubMed

    Gallivan, Jason P; Bowman, Natasha A R; Chapman, Craig S; Wolpert, Daniel M; Flanagan, J Randall

    2016-06-01

    Recent neural and behavioral findings provide support for the influential idea that in situations in which multiple action options are presented simultaneously, we prepare action plans for each competing option before deciding between and executing one of those plans. However, in natural, everyday environments, our available action options frequently change from one moment to the next, and there is often uncertainty as to whether additional options will become available before having to select a particular course of action. Here, with the use of a target-directed reaching task, we show that in this situation, the brain specifies a competing action for each new, sequentially presented potential target and that recently formed action plans can be revisited and updated so as to conform with separate, more newly developed, plans. These findings indicate that the brain forms labile motor plans for sequentially arising target options that can be flexibly restructured to accommodate new motor plans. PMID:27030738

  13. Project licensing plan for UMTRA (Uranium Mill Tailings Remedial Action) sites

    SciTech Connect

    Not Available

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process ( Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs.

  14. Corrective Action Investigation plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfield, Nevada Test Site, Nevada, March 1999

    SciTech Connect

    ITLV

    1999-03-01

    The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

  15. Interim Action Proposed Plan for the old radioactive waste burial ground (643-E)

    SciTech Connect

    McFalls, S.

    1995-12-01

    This Interim Action Proposed (IAPP) is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this IAPP is to describe the preferred interim remedial action for addressing the Old Radioactive Waste Burial Ground (ORWBG) unit located in the Burial Ground Complex (BGC) at the Savannah River Site (SRS) in Aiken, South Carolina. On December 21, 1989, SRS was included on the National Priorities List (NPL). In accordance with Section 120 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), DOE has negotiated a Federal Facility Agreement (FFA, 1993) with EPA and SCDHEC to coordinate remedial activities at SRS. Public participation requirements are listed in Sections 113 and 117 of CERCLA. These requirements include establishment of an Administrative Record File that documents the selection of remedial alternatives and allows for review and comment by the public regarding those alternatives. The SRS Public Involvement Plan (PIP) (DOE, 1994) is designed to facilitate public involvement in the decision-making process for permitting closure, and the selection of remedial alternatives. Section 117(a) of CERCLA, 1980, as amended, requires publication of a notice of any proposed remedial action.

  16. 26 CFR 1.404(c)-1 - Certain negotiated plans; effect of section 404(c).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 5 2011-04-01 2011-04-01 false Certain negotiated plans; effect of section 404... Plans, Etc. § 1.404(c)-1 Certain negotiated plans; effect of section 404(c). (a) Section 404(a) does not... to maintain a sound position in the labor market producing the commodity. Thus, for example, if...

  17. Corrective Action Investigation Plan for Corrective Action Unit 500: Test Cell A Septic System, Nevada Test Site, Nevada

    SciTech Connect

    IT Las Vegas

    1999-01-27

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s), and may include solid waste management units, individual disposal sites, or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP will be used in conjunction with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998c), hereafter referred to as the Leachfield Work Plan. Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. This CAIP contains CAU-specific information including a facility description, environmental sample collection objectives, and the criteria for conducting site investigation activities at CAU 500. This CAIP addresses one of three leachfield systems associated with Test Cell A, which is located in Area 25 at the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (see Leachfield Work Plan Figure 1-1). Corrective Action Unit 500 is comprised of the Test Cell A Septic System (CAS 25-04-05) and the associated leachfield system presented in Figure 1-1 (FFACO, 1996).

  18. Technical support section annual work plan for FY 1996

    SciTech Connect

    Adkissson, B.P.; Allison, K.L.; Hess, R.A.; Kunselman, C.W.; Odom, S.M.; Smelcer, D.R.

    1996-04-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I&C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Work performed by TSS is in support of basic and applied research and development (R&D), engineering and instrument and computer systems managed by ORNL. It is the mission of TSS to support programs and policies of ORNL, emphasizing safety and ensuring cost-effective support for R&D. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from and driven directly by current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R&D programs because of attrition or budget cuts and the establishment of new facilities or environmental safety and health programs. TSS does not have an annual budget to cover operating expenses incurred in providing instrumentation maintenance support to ORNL. Each year TSS contacts ORNL division finance managers or division finance officers to obtain information concerning projected funding levels of programs and facilities they manage. Although TSS has no direct responsibility for the maintenance or repair of real property, it does perform breakdown maintenance, preventive maintenance and calibration of laboratory, production, and experimental equipment, all of which is used for programmatic purposes. Operating expense funds from supported divisions support this type of equipment.

  19. Nantucket, Ma. Climate Protection Action Plan: A Public Outreach Strategy

    NASA Astrophysics Data System (ADS)

    Petrik, C.; Stephenson, A.; Petsch, S.

    2009-12-01

    As communities and municipalities gain a better understanding of climate change, they are exploring the ways in which to work towards adaptation and mitigation. One strategy that the Island of Nantucket, Massachusetts turned toward is the drafting of a Climate Protection Action Plan (CPAP). The CPAP was developed during the summer of 2009 to meet three goals: (1) assist the Town of Nantucket in creating a framework to help them reduce CO2 emissions; (2) educate the municipality and community in techniques that promote energy efficiency and sustainability on the island; and (3) document past, present and future approaches adopted by the Town towards emissions reduction and energy sustainability. In particular, this project focused on using local strengths and natural resources identified by island stakeholders that may help the island to mitigate carbon emissions and adapt to climate change.. Drafting the CPAP provided community members and politicians with an opportunity to become better educated in the science of climate change and to learn how climate change will affect their community. On the island of Nantucket, leaders in the religious, civic, and political communities were brought into a conversation about how each group could contribute to reducing greenhouse gas emissions. A geosciences graduate student was brought into the CPAP team as a climate fellow to facilitate this conversation. This provided the foundation for stakeholder recommendations incorporated into the CPAP. This capacity-building model served as an effective way to create an informal learning environment about climate change that allowed members of the island community to directly participate in developing their locally appropriate climate protection strategy. The draft CPAP developed through this study and presented to the Town of Nantucket comprises assessments and recommendations in public research and education; building and energy efficiency; transportation; renewable energy; and carbon

  20. Aquatic ecosystem condition: The Fraser River Action Plan approach

    SciTech Connect

    Tuominen, T.; Raymond, B.; Sekela, M.; Reynoldson, T.

    1995-12-31

    A major goal of the Canadian government`s Fraser River Action Plan (FRAP) is to clean up existing pollution problems in the Fraser River Basin. In support of this goal, the Environmental Quality Assessment Program is assessing the quality of the aquatic environment, particularly with respect to contaminants. The program, conducted from 1993 to 1998, is to establish a baseline condition for the aquatic ecosystem against which the success of clean up efforts can be measured. The FRAP approach is to use a combination of contaminant exposure or stressor indicators and organism ``effects`` indicators. The focus is on three components of the aquatic ecosystem: (1) bed sediment, (2) resident fish and (3) benthos. A priority for the program is integration of the three components, wherever possible. Bed sediments, as indicators of contaminant stress, are sampled at fourteen reaches in the river and major tributaries. Two species of resident fish are sampled and analyzed for condition factors, enzyme induction, histopathology and contaminant content at each of nine sites in the basin. The resident fish data are providing a measure of contaminant exposure and effect. Organism community effects will be assessed by a study which is classifying approximately 200 tributary and mainstem sites based on benthos community structure. For the first time in a large river system in Canada, this benthos study uses a multivariate approach which relates a suite of chemical and physical characteristics to benthos community structure.

  1. Process safety management and interim or remedial action plans

    SciTech Connect

    Boss, M.J.; Henney, D.A.; Heitzman, V.K.; Day, D.W.

    1996-12-31

    Remedial Actions, including Interim Remedial Activities, often require the use of treatment facilities or stabilization techniques using on-site chemical processes. As such, the 29 CFR 1910.119 Process Safety Management (PSM) of Highly Hazardous Chemicals (PSM Standard) and the USEPA regulations for Risk Management Planning require that these chemicals and their attendant potential hazards be identified. A Hazard and Operation (HAZOP) study, Failure Mode and Effect Analysis (FMEA), Fault Tree Analysis, or equivalent graphic presentation of processes must be completed. These studies form a segment of the Process Hazard Analysis (PHA). HAZOP addresses each system and each element of a system that could deviate from normal operations and thus cause a hazard. A full assessment of each process is produced by looking at the hazards, consequences, causes and personnel protection needed. Many variables must be considered when choosing the appropriate PHA technique including the size of the plant, the number of processes, the types of processes, and the types of chemicals used. A mixture of these techniques may be required to adequately transmit information about the process being evaluated.

  2. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Policy statement on affirmative action (see section 13B). 60-3.17 Section 60-3.17 Public Contracts and Property Management Other Provisions Relating to Public Contracts OFFICE OF FEDERAL CONTRACT COMPLIANCE PROGRAMS, EQUAL EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR...

  3. The Role of Cue-Response Mapping in Motorvisual Impairment and Facilitation: Evidence for Different Roles of Action Planning and Action Control in Motorvisual Dual-Task Priming

    ERIC Educational Resources Information Center

    Thomaschke, Roland; Hopkins, Brian; Miall, R. Christopher

    2012-01-01

    Previous research has shown that actions impair the visual perception of categorically action-consistent stimuli. On the other hand, actions can also facilitate the perception of spatially action-consistent stimuli. We suggest that motorvisual impairment is due to action planning processes, while motorvisual facilitation is due to action control…

  4. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    SciTech Connect

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  5. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-04-01

    6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005).

  6. NFE--Planning and Organizing for Action. Courier No. 27.

    ERIC Educational Resources Information Center

    ASPBAE Courier Service, 1983

    1983-01-01

    This issue contains six articles, reports, and essays on planning and organizing nonformal education in the Asian-South Pacific area. A chapter reprinted from "Planning Nonformal Education" discusses the need for planning, past efforts, and five steps in a strategy suggested for planning locally-oriented and target-specific nonformal educational…

  7. Action Mapping: A Planning Tool for Change. HSLA Monograph.

    ERIC Educational Resources Information Center

    Matsui, Bruce

    Future leaders will have to rely upon skills that are far different from those used in the past. Action mapping serves as a meta-process for moving schools toward desired ends; it calls upon school leaders to move into action, to reflect upon such actions, and to collect stories for future reflections. This process could be helpful to a school…

  8. 40 CFR 264.304 - Response actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow...

  9. 40 CFR 264.223 - Response actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... § 264.221 (c) or (d) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section....

  10. 40 CFR 264.253 - Response actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) or (d) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the...

  11. 40 CFR 264.223 - Response actions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 264.221 (c) or (d) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section....

  12. 40 CFR 264.304 - Response actions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow...

  13. 40 CFR 264.304 - Response actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow...

  14. 40 CFR 265.224 - Response actions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... action plan. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow rate into the leak detection system exceeds the...

  15. 40 CFR 264.223 - Response actions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... § 264.221 (c) or (d) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section....

  16. 40 CFR 265.224 - Response actions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... action plan. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow rate into the leak detection system exceeds the...

  17. 40 CFR 265.224 - Response actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... action plan. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow rate into the leak detection system exceeds the...

  18. 40 CFR 264.304 - Response actions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow...

  19. 40 CFR 264.304 - Response actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section. (b) If the flow...

  20. Toward a Theoretical Framework for Understanding the Relationship between Situated Action and Planned Action Models of Behavior in Information Retrieval Contexts: Contributions from Phenomenology.

    ERIC Educational Resources Information Center

    Ng, Kwong Bor

    2002-01-01

    Discussion of human-computer interaction and planned action focuses on the belief that it is impossible to consider an action without an a priori plan, even according to the phenomenological position taken for granted by the situated action theory. Reports results of a quasi-experiment that focused on plan deviation within an information seeking…

  1. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    SciTech Connect

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  2. 23 CFR Appendix B to Subpart D of... - Sample Corrective Action Plan

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Sample Corrective Action Plan B Appendix B to Subpart D... EXTERNAL PROGRAMS Construction Contract Equal Opportunity Compliance Procedures Pt. 230, Subpt. D, App. B Appendix B to Subpart D of Part 230—Sample Corrective Action Plan Deficiency 1: Sources likely to...

  3. Action Planning in Typically and Atypically Developing Children (Unilateral Cerebral Palsy)

    ERIC Educational Resources Information Center

    Craje, Celine; Aarts, Pauline; Nijhuis-van der Sanden, Maria; Steenbergen, Bert

    2010-01-01

    In the present study, we investigated the development of action planning in children with unilateral Cerebral Palsy (CP, aged 3-6 years, n = 24) and an age matched control group. To investigate action planning, participants performed a sequential movement task. They had to grasp an object (a wooden play sword) and place the sword in a hole in a…

  4. How You Move Is What You See: Action Planning Biases Selection in Visual Search

    ERIC Educational Resources Information Center

    Wykowska, Agnieszka; Schubo, Anna; Hommel, Bernhard

    2009-01-01

    Three experiments investigated the impact of planning and preparing a manual grasping or pointing movement on feature detection in a visual search task. The authors hypothesized that action planning may prime perceptual dimensions that provide information for the open parameters of that action. Indeed, preparing for grasping facilitated detection…

  5. A Strategic Action Plan for Advancing Math and Science Education in New Mexico 2007-2010

    ERIC Educational Resources Information Center

    New Mexico Public Education Department, 2007

    2007-01-01

    This Strategic Action Plan for Advancing Math and Science Education is an initial outline of strategies, actions, measures of progress, resources needed, timelines, and responsible parties. The Plan focuses on these three main goals: (1) increasing student interest, participation, and achievement in math and science; (2) raising public support and…

  6. Using Action Plans to Support Communication Programming for Children Who Are Deafblind

    ERIC Educational Resources Information Center

    Bruce, Susan M.

    2008-01-01

    The author describes the use of action plans to support 2 teachers' post-in-service implementation of communication strategies with 3 children who are deafblind. In the action plans, the teachers recorded changes in thinking and instructional practices under the 4 aspects of communication: form, function, content, and context. They also recorded…

  7. 24 CFR 248.233 - Approval of a plan of action that includes incentives.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING ACT AND OTHER AUTHORITIES PREPAYMENT OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income Preservation Act of 1987 § 248.233 Approval of a plan of action...— (1) The housing will be retained as housing affordable for very low income families,...

  8. 23 CFR Appendix B to Subpart D of... - Sample Corrective Action Plan

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... EXTERNAL PROGRAMS Construction Contract Equal Opportunity Compliance Procedures Pt. 230, Subpt. D, App. B Appendix B to Subpart D of Part 230—Sample Corrective Action Plan Deficiency 1: Sources likely to yield... 23 Highways 1 2011-04-01 2011-04-01 false Sample Corrective Action Plan B Appendix B to Subpart...

  9. Action planning in typically and atypically developing children (unilateral cerebral palsy).

    PubMed

    Crajé, Céline; Aarts, Pauline; Nijhuis-van der Sanden, Maria; Steenbergen, Bert

    2010-01-01

    In the present study, we investigated the development of action planning in children with unilateral Cerebral Palsy (CP, aged 3-6 years, n=24) and an age matched control group. To investigate action planning, participants performed a sequential movement task. They had to grasp an object (a wooden play sword) and place the sword in a hole in a wooden block. Our main dependent variable was the grip type that participants used, i.e., did they adapt their initial grip choice such that they would reach a comfortable posture at the end of the action? This end-state comfort effect has been abundantly shown in research on action planning, and is taken as evidence for anticipatory planning. The first aim of the study was to investigate the development of action planning in the unilateral CP group and the control group. Our hypothesis was that action planning improves with age in the control group, but not in the unilateral CP group. The results showed that planning was impaired in the unilateral CP group compared with the control group. Consistent with our hypothesis, we found an age effect in the control group, but not in the unilateral CP group. In the control group 5 and 6 years olds showed more anticipatory planning compared with the 3 and 4 years olds. The second aim of this study was to examine whether an intervention for children with unilateral CP (i.e., constrained induced movement therapy combined with bimanual training) affected action planning. The children with unilateral CP were therefore measured on the experimental task before and after an 8-week intervention period. The results showed that planning improved after the intervention. This finding suggests that action planning ability in young children with unilateral CP may be sensitive to improvement. These findings are discussed within the context of typical and atypical development of action planning and further guidelines for intervention in children with unilateral CP are given. PMID:20451346

  10. Perspectives that influence action plans for chronic obstructive pulmonary disease

    PubMed Central

    Costi, S; Brooks, D; Goldstein, RS

    2006-01-01

    BACKGROUND: Prompt treatment of acute exacerbations (AEs) in chronic obstructive pulmonary disease (COPD) improves quality of life and reduces the use of health care resources. Although patient self-management through an individualized action plan (AP) can help with early initiation of therapy, its use is critically dependent on the patient recognizing the features of an exacerbation. OBJECTIVE: To describe COPD patients’ experiences with AEs, as well as health care professionals’ (HCPs’) attitudes toward the provision of an AP as part of self-management education. METHODS: Thirty-two patients with moderate to severe COPD who recently experienced at least one AE, and 22 HCPs with experience in the management of COPD, were interviewed. RESULTS: The most common symptoms and signs associated with an AE were difficulty breathing (84%), fatigue (81%), cold symptoms (59%), changes in sputum colour (53%) or amount (47%), and cough (44%). The main precipitants identified were environmental triggers (47%), infective agents (31%), excessive activities (25%), emotional factors (16%) and changes in medications (9%). Strategies for dyspnea relief included increasing medications (72%), resting (56%), avoiding exposure to environmental triggers (41%) and performing breathing exercises (31%). Patients supported the use of an AP and recommended that it be individualized for symptoms and triggers, and that it should also include strategies for addressing anxiety and depression. HCPs also supported the use of an individualized AP and recommended that it be regularly revisited, depending on the patient’s disease severity. CONCLUSIONS: Patients’ experiences with AEs do not always conform to a standard medical definition. Therefore, an understanding of their experience is of value in the design of an individualized AP. HCPs support the use of an AP that emphasizes self-management of exacerbations as well as general COPD management. PMID:17036089

  11. 12 CFR 6.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... monitor the condition of the bank (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan within the schedule established in this subpart (section 38(e)(2)); (iv) Restricting the growth of... because it has failed to submit or implement, in any material respect, an acceptable capital...

  12. 40 CFR 52.515 - Original identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Conveyorized Degreaser, Cutback Asphalt, Cold Cleaner, District, Emission, Episode Stage, Fossil Fuel, Fossil... (Section 199.2)—Added: CFR, EPA, ppmv Unchanged from Section 8-2:702: B.T.U., cal., CO, COHs, cfm, g., Hi....515, see the List of CFR Sections Affected, which appears in the Finding Aids section of the...

  13. 40 CFR 52.515 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Conveyorized Degreaser, Cutback Asphalt, Cold Cleaner, District, Emission, Episode Stage, Fossil Fuel, Fossil... (Section 199.2)—Added: CFR, EPA, ppmv Unchanged from Section 8-2:702: B.T.U., cal., CO, COHs, cfm, g., Hi....515, see the List of CFR Sections Affected, which appears in the Finding Aids section of the...

  14. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    SciTech Connect

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  15. Environmental monitoring plan - environmental monitoring section. Revision 1

    SciTech Connect

    Wilt, G.C.; Tate, P.J.; Brigdon, S.L.

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  16. Action Research to Support the Sustainability of Strategic Planning

    ERIC Educational Resources Information Center

    Antheil, Jane H.; Spinelli, Stephen, Jr.

    2011-01-01

    This article suggests that developing a strategic plan, even through a highly participative and data-driven process, is not sufficient to sustain change if implementation of the plan is not monitored as an organizational change event. To the degree that a strategic plan is institutionally transformative, monitoring change during implementation…

  17. M.A.P.S.: Mesa Action Planning System.

    ERIC Educational Resources Information Center

    Larson, Elizabeth J. Hunt

    This report describes implementation of a districtwide planning model in the Mesa, Arizona, Public Schools. Figures illustrate planning processes throughout the report. Intended as an implementive framework, the planning system's purposes are to assist decision making about resource allocation, program direction, progress measurement, and district…

  18. Shaping the College Curriculum: Academic Plans in Action.

    ERIC Educational Resources Information Center

    Stark, Joan S.; Lattuca, Lisa R.

    This book proposes a broad view of the college curriculum, suggesting that it be defined as an "academic plan." The plan included decisions about what, why, and how students learn; ways to determine whether students have learned what they are supposed to learn; and methods of using this information to improve the plan. Taking both a macro and a…

  19. Corrective Action Investigation Plan for Corrective Action Unit 511: Waste Dumps (Piles & Debris), Nevada Test Site, Nevada, Rev. No.: 0 with ROTC 1

    SciTech Connect

    David A. Strand

    2004-08-01

    This Corrective Action Investigation Plan for Corrective Action Unit 511: Waste Dumps (Piles & Debris), Nevada Test Site, Nevada, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada, U.S. Department of Energy, and the U.S. Department of Defense. The general purpose of the investigation is to ensure adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select viable corrective actions. This Corrective Action Investigation Plan provides investigative details for CAU 511, whereas programmatic aspects of this project are discussed in the ''Project Management Plan'' (DOE/NV, 1994). General field and laboratory quality assurance and quality control issues are presented in the ''Industrial Sites Quality Assurance Project Plan'' (NNSA/NV, 2002). Health and safety aspects of the project are documented in the current version of the Environmental Engineering Services Contractor's Health and Safety Plan and will be supplemented with a site-specific safety basis document. Corrective Action Unit 511 is comprised of the following nine corrective action sites in Nevada Test Site Areas 3, 4, 6, 7, 18, and 19: (1) 03-08-02, Waste Dump (Piles & Debris); (2) 03-99-11, Waste Dump (Piles); (3) 03-99-12, Waste Dump (Piles & Debris); (4) 04-99-04, Contaminated Trench/Berm; (5) 06-16-01, Waste Dump (Piles & Debris); (6) 06-17-02, Scattered Ordnance/Automatic Weapons Range; (7) 07-08-01, Contaminated Mound; (8) 18-99-10, Ammunition Dump; and (9) 19-19-03, Waste Dump (Piles & Debris). Corrective Action Sites 18-99-10 and 19-19-03 were identified after a review of the ''1992 RCRA Part B Permit Application for Waste Management Activities at the Nevada Test Site, Volume IV, Section L Potential Solid Waste Management Unit'' (DOE/NV, 1992). The remaining seven sites were first identified in the 1991 Reynolds Electrical & Engineering Co., Inc. document entitled, ''Nevada

  20. Higher-order action planning for individual and joint object manipulations.

    PubMed

    Meyer, Marlene; van der Wel, Robrecht P R D; Hunnius, Sabine

    2013-04-01

    Many actions involve multiple action steps, which raises the question how far ahead people plan when they perform such actions. Here, we examined higher-order planning for action sequences and whether people planned similarly or differently when acting individually or together with an action partner. For individual performances, participants picked up an object with one hand and passed it to their other hand before placing it onto a target location. For joint performances, they picked up the object and handed it to their action partner, who placed it onto the target location. Each object could be grasped at only two possible grasping positions, implying that the first selected grasp on the object determined the postures for the rest of the action sequence. By varying the height of the target shelf, we tested whether people planned ahead and modulated their grasp choices to avoid uncomfortable end postures. Our results indicated that participants engaged in higher-order planning, but needed task experience before demonstrating such planning during both individual and joint performances. The rate of learning was similar in the two conditions, and participants transferred experience from individual to joint performance. Our results indicate similarity in mechanisms underlying individual and joint action sequence planning. PMID:23361302