Science.gov

Sample records for action plans raps

  1. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  2. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  3. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  4. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  5. 40 CFR 270.68 - Remedial Action Plans (RAPs).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Remedial Action Plans (RAPs). 270.68 Section 270.68 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.68 Remedial Action Plans (RAPs). Remedial Action Plans (RAPs) are special forms of permits...

  6. Partnering for environmental restoration: The Port Hope Harbour Remedial Action Plan (RAP)

    SciTech Connect

    Weston, S.M.C.

    1995-12-31

    A Remedial Action Plan (RAP) is being developed for Port Hope Harbour, one of 43 Areas of Concern (AOCs) identified by the International Joint Commission (IJC). The RAP, when implemented, will lead to the restoration and protection of desirable water conditions in Port Hope Harbour. The environmental concern associated with the harbor can be best viewed as a historical contaminated sediment problem. Approximately 90,000 m{sup 3} of sediment located in Port Hope Harbour`s turning basin and west slip are contaminated by uranium and thorium series radionuclides, heavy metals, and PCBs. There are several groups contributing to the development of the RAP. All of these groups have the common goal of developing an environmentally sound plan that reflects the views of the community. Strategic partnerships have been established that recognize the need to integrate and coordinate the efforts of all agencies, stakeholders, and the community. The objective is to develop an environmentally sound remediation plan through an efficient and effective management framework.

  7. 40 CFR 270.210 - What records must I maintain concerning my RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... concerning my RAP? 270.210 Section 270.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.210 What records must I maintain concerning my RAP? You are required to keep records of: (a) All data used to complete RAP applications and...

  8. 40 CFR 270.160 - When does my RAP become effective?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false When does my RAP become effective? 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.160 When does my RAP become effective? Your RAP becomes effective 30...

  9. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under §...

  10. 40 CFR 270.120 - To whom must I submit my RAP application?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false To whom must I submit my RAP... Action Plans (RAPs) Applying for A Rap § 270.120 To whom must I submit my RAP application? You must submit your application for a RAP to the Director for approval....

  11. 40 CFR 270.95 - How do I apply for a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false How do I apply for a RAP? 270.95... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.95 How do I apply for a RAP? To apply for a RAP, you must complete an...

  12. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under §...

  13. 40 CFR 270.160 - When does my RAP become effective?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false When does my RAP become effective? 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.160 When does my RAP become effective? Your RAP becomes effective 30...

  14. 40 CFR 270.160 - When does my RAP become effective?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false When does my RAP become effective? 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.160 When does my RAP become effective? Your RAP becomes effective 30...

  15. 40 CFR 270.210 - What records must I maintain concerning my RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... concerning my RAP? 270.210 Section 270.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.210 What records must I maintain concerning my RAP? You are required to keep records of: (a) All data used to complete RAP applications and...

  16. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under §...

  17. 40 CFR 270.95 - How do I apply for a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false How do I apply for a RAP? 270.95... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.95 How do I apply for a RAP? To apply for a RAP, you must complete an...

  18. 40 CFR 270.210 - What records must I maintain concerning my RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... concerning my RAP? 270.210 Section 270.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.210 What records must I maintain concerning my RAP? You are required to keep records of: (a) All data used to complete RAP applications and...

  19. 40 CFR 270.120 - To whom must I submit my RAP application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false To whom must I submit my RAP... Action Plans (RAPs) Applying for A Rap § 270.120 To whom must I submit my RAP application? You must submit your application for a RAP to the Director for approval....

  20. 40 CFR 270.95 - How do I apply for a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false How do I apply for a RAP? 270.95... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.95 How do I apply for a RAP? To apply for a RAP, you must complete an...

  1. 40 CFR 270.210 - What records must I maintain concerning my RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... concerning my RAP? 270.210 Section 270.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.210 What records must I maintain concerning my RAP? You are required to keep records of: (a) All data used to complete RAP applications and...

  2. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for a RAP? 270.110 Section 270.110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Applying for A Rap § 270.110 What must I include in my application for a RAP? You must include the following information in your application for a RAP: (a) The name, address,...

  3. 40 CFR 270.120 - To whom must I submit my RAP application?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false To whom must I submit my RAP... Action Plans (RAPs) Applying for A Rap § 270.120 To whom must I submit my RAP application? You must submit your application for a RAP to the Director for approval....

  4. 40 CFR 270.160 - When does my RAP become effective?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false When does my RAP become effective? 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.160 When does my RAP become effective? Your RAP becomes effective 30...

  5. 40 CFR 270.160 - When does my RAP become effective?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false When does my RAP become effective? 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.160 When does my RAP become effective? Your RAP becomes effective 30...

  6. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under §...

  7. 40 CFR 270.120 - To whom must I submit my RAP application?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false To whom must I submit my RAP... Action Plans (RAPs) Applying for A Rap § 270.120 To whom must I submit my RAP application? You must submit your application for a RAP to the Director for approval....

  8. 40 CFR 270.135 - What must the Director include in a draft RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... draft RAP? 270.135 Section 270.135 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Action Plans (RAPs) Getting A Rap Approved § 270.135 What must the Director include in a draft RAP? If the Director prepares a draft RAP, it must include the: (a) Information required under §...

  9. 40 CFR 270.95 - How do I apply for a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false How do I apply for a RAP? 270.95... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.95 How do I apply for a RAP? To apply for a RAP, you must complete an...

  10. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for a RAP? 270.110 Section 270.110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Applying for A Rap § 270.110 What must I include in my application for a RAP? You must include the following information in your application for a RAP: (a) The name, address,...

  11. 40 CFR 270.95 - How do I apply for a RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false How do I apply for a RAP? 270.95... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.95 How do I apply for a RAP? To apply for a RAP, you must complete an...

  12. 40 CFR 270.210 - What records must I maintain concerning my RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... concerning my RAP? 270.210 Section 270.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.210 What records must I maintain concerning my RAP? You are required to keep records of: (a) All data used to complete RAP applications and...

  13. 40 CFR 270.120 - To whom must I submit my RAP application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false To whom must I submit my RAP... Action Plans (RAPs) Applying for A Rap § 270.120 To whom must I submit my RAP application? You must submit your application for a RAP to the Director for approval....

  14. 40 CFR 270.80 - What is a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false What is a RAP? 270.80 Section 270.80... ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.80 What is a RAP? (a) A RAP is a special form of RCRA permit that you, as an owner...

  15. 40 CFR 270.100 - Who must obtain a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Who must obtain a RAP? 270.100 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.100 Who must obtain a RAP? When a facility or remediation waste management site...

  16. 40 CFR 270.195 - When will my RAP expire?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false When will my RAP expire? 270.195... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.195 When will my RAP...

  17. 40 CFR 270.80 - What is a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false What is a RAP? 270.80 Section 270.80... ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.80 What is a RAP? (a) A RAP is a special form of RCRA permit that you, as an owner...

  18. 40 CFR 270.195 - When will my RAP expire?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false When will my RAP expire? 270.195... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.195 When will my RAP...

  19. 40 CFR 270.195 - When will my RAP expire?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false When will my RAP expire? 270.195... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.195 When will my RAP...

  20. 40 CFR 270.100 - Who must obtain a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Who must obtain a RAP? 270.100 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.100 Who must obtain a RAP? When a facility or remediation waste management site...

  1. 40 CFR 270.195 - When will my RAP expire?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false When will my RAP expire? 270.195... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.195 When will my RAP...

  2. 40 CFR 270.100 - Who must obtain a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Who must obtain a RAP? 270.100 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.100 Who must obtain a RAP? When a facility or remediation waste management site...

  3. 40 CFR 270.80 - What is a RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What is a RAP? 270.80 Section 270.80... ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.80 What is a RAP? (a) A RAP is a special form of RCRA permit that you, as an owner...

  4. 40 CFR 270.80 - What is a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false What is a RAP? 270.80 Section 270.80... ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.80 What is a RAP? (a) A RAP is a special form of RCRA permit that you, as an owner...

  5. 40 CFR 270.100 - Who must obtain a RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Who must obtain a RAP? 270.100 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.100 Who must obtain a RAP? When a facility or remediation waste management site...

  6. 40 CFR 270.195 - When will my RAP expire?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false When will my RAP expire? 270.195... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.195 When will my RAP...

  7. 40 CFR 270.80 - What is a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false What is a RAP? 270.80 Section 270.80... ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.80 What is a RAP? (a) A RAP is a special form of RCRA permit that you, as an owner...

  8. 40 CFR 270.100 - Who must obtain a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Who must obtain a RAP? 270.100 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.100 Who must obtain a RAP? When a facility or remediation waste management site...

  9. 40 CFR 270.125 - If I submit my RAP application as part of another document, what must I do?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false If I submit my RAP application as part... PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.125 If I submit my RAP application as part of another document, what must I do? If you submit your application for a RAP as a part...

  10. 40 CFR 270.105 - Who must sign the application and any required reports for a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... required reports for a RAP? 270.105 Section 270.105 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.105 Who must sign the application and any required reports for a RAP? Both the owner and the operator must sign the RAP application and any...

  11. 40 CFR 270.125 - If I submit my RAP application as part of another document, what must I do?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false If I submit my RAP application as part... PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.125 If I submit my RAP application as part of another document, what must I do? If you submit your application for a RAP as a part...

  12. 40 CFR 270.125 - If I submit my RAP application as part of another document, what must I do?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false If I submit my RAP application as part... PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.125 If I submit my RAP application as part of another document, what must I do? If you submit your application for a RAP as a part...

  13. 40 CFR 270.105 - Who must sign the application and any required reports for a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... required reports for a RAP? 270.105 Section 270.105 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.105 Who must sign the application and any required reports for a RAP? Both the owner and the operator must sign the RAP application and any...

  14. 40 CFR 270.105 - Who must sign the application and any required reports for a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... required reports for a RAP? 270.105 Section 270.105 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.105 Who must sign the application and any required reports for a RAP? Both the owner and the operator must sign the RAP application and any...

  15. 40 CFR 270.125 - If I submit my RAP application as part of another document, what must I do?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false If I submit my RAP application as part... PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.125 If I submit my RAP application as part of another document, what must I do? If you submit your application for a RAP as a part...

  16. 40 CFR 270.105 - Who must sign the application and any required reports for a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... required reports for a RAP? 270.105 Section 270.105 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.105 Who must sign the application and any required reports for a RAP? Both the owner and the operator must sign the RAP application and any...

  17. 40 CFR 270.125 - If I submit my RAP application as part of another document, what must I do?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false If I submit my RAP application as part... PERMIT PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.125 If I submit my RAP application as part of another document, what must I do? If you submit your application for a RAP as a part...

  18. 40 CFR 270.105 - Who must sign the application and any required reports for a RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... required reports for a RAP? 270.105 Section 270.105 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Applying for A Rap § 270.105 Who must sign the application and any required reports for a RAP? Both the owner and the operator must sign the RAP application and any...

  19. 40 CFR 270.185 - For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... choose to terminate my final RAP, or deny my renewal application? 270.185 Section 270.185 Protection of... PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified... final RAP, or deny my renewal application? The Director may terminate your final RAP on his...

  20. 40 CFR 270.185 - For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... choose to terminate my final RAP, or deny my renewal application? 270.185 Section 270.185 Protection of... PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified... final RAP, or deny my renewal application? The Director may terminate your final RAP on his...

  1. 40 CFR 270.185 - For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... choose to terminate my final RAP, or deny my renewal application? 270.185 Section 270.185 Protection of... PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified... final RAP, or deny my renewal application? The Director may terminate your final RAP on his...

  2. 40 CFR 270.185 - For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... choose to terminate my final RAP, or deny my renewal application? 270.185 Section 270.185 Protection of... PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified... final RAP, or deny my renewal application? The Director may terminate your final RAP on his...

  3. 40 CFR 270.185 - For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... choose to terminate my final RAP, or deny my renewal application? 270.185 Section 270.185 Protection of... PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified... final RAP, or deny my renewal application? The Director may terminate your final RAP on his...

  4. Hazardous Waste Remedial Actions Program: Remedial Actions Planning Program Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1989-04-01

    The purpose of this Plan is to describe the quality assurance (QA) requirements for the RAP Program by identifying the quality elements to be controlled and specifying how they will be controlled. The activities for which control elements will be identified include those relating to: preparation, review, and approval of plans, reports, and studies; execution of field and analytical work by subcontractors and other agents; control of subcontractors and other agents during other phases of work; and actions internal to the RAP Program to ensure proper execution of projects.

  5. 40 CFR 270.225 - What must the State or EPA Region report about noncompliance with RAPs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... report about noncompliance with RAPs? 270.225 Section 270.225 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.225 What must the State or EPA Region report about noncompliance with RAPs? The State or EPA Region must report noncompliance with...

  6. 40 CFR 270.155 - May the decision to approve or deny my RAP application be administratively appealed?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RAP application be administratively appealed? 270.155 Section 270.155 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.155 May the decision to approve or deny my RAP application be administratively appealed? (a) Any commenter on the...

  7. 40 CFR 270.225 - What must the State or EPA Region report about noncompliance with RAPs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... report about noncompliance with RAPs? 270.225 Section 270.225 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.225 What must the State or EPA Region report about noncompliance with RAPs? The State or EPA Region must report noncompliance with...

  8. 40 CFR 270.150 - How will the Director make a final decision on my RAP application?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... decision on my RAP application? 270.150 Section 270.150 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.150 How will the Director make a final decision on my RAP application? (a) The Director must consider and respond to any significant...

  9. 40 CFR 270.165 - When may I begin physical construction of new units permitted under the RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of new units permitted under the RAP? 270.165 Section 270.165 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.165 When may I begin physical construction of new units permitted under the RAP? You must not begin physical construction of new...

  10. 40 CFR 270.170 - After my RAP is issued, how may it be modified, revoked and reissued, or terminated?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false After my RAP is issued, how may it be... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.170 After my RAP is issued, how may it be modified, revoked and reissued,...

  11. 40 CFR 270.175 - For what reasons may the Director choose to modify my final RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... choose to modify my final RAP? 270.175 Section 270.175 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.175 For what reasons may the Director choose to modify my final RAP? (a) The Director may...

  12. 40 CFR 270.170 - After my RAP is issued, how may it be modified, revoked and reissued, or terminated?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false After my RAP is issued, how may it be... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.170 After my RAP is issued, how may it be modified, revoked and reissued,...

  13. 40 CFR 270.155 - May the decision to approve or deny my RAP application be administratively appealed?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RAP application be administratively appealed? 270.155 Section 270.155 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.155 May the decision to approve or deny my RAP application be administratively appealed? (a) Any commenter on the...

  14. 40 CFR 270.130 - What is the process for approving or denying my application for a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... denying my application for a RAP? 270.130 Section 270.130 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.130 What is the process for approving or denying my application for a RAP? (a) If the Director tentatively finds that your...

  15. 40 CFR 270.225 - What must the State or EPA Region report about noncompliance with RAPs?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... report about noncompliance with RAPs? 270.225 Section 270.225 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.225 What must the State or EPA Region report about noncompliance with RAPs? The State or EPA Region must report noncompliance with...

  16. 40 CFR 270.215 - How are time periods in the requirements in this subpart and my RAP computed?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements in this subpart and my RAP computed? 270.215 Section 270.215 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.215 How are time periods in the requirements in this subpart and my RAP computed? (a) Any time period scheduled to begin...

  17. 40 CFR 270.165 - When may I begin physical construction of new units permitted under the RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of new units permitted under the RAP? 270.165 Section 270.165 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.165 When may I begin physical construction of new units permitted under the RAP? You must not begin physical construction of new...

  18. 40 CFR 270.150 - How will the Director make a final decision on my RAP application?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... decision on my RAP application? 270.150 Section 270.150 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.150 How will the Director make a final decision on my RAP application? (a) The Director must consider and respond to any significant...

  19. 40 CFR 270.150 - How will the Director make a final decision on my RAP application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... decision on my RAP application? 270.150 Section 270.150 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.150 How will the Director make a final decision on my RAP application? (a) The Director must consider and respond to any significant...

  20. 40 CFR 270.165 - When may I begin physical construction of new units permitted under the RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of new units permitted under the RAP? 270.165 Section 270.165 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.165 When may I begin physical construction of new units permitted under the RAP? You must not begin physical construction of new...

  1. 40 CFR 270.90 - Does my RAP grant me any rights or relieve me of any obligations?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Does my RAP grant me any rights or... PROGRAM Remedial Action Plans (RAPs) General Information § 270.90 Does my RAP grant me any rights or relieve me of any obligations? The provisions of § 270.4 apply to RAPs. (Note: The provisions of §...

  2. 40 CFR 270.150 - How will the Director make a final decision on my RAP application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... decision on my RAP application? 270.150 Section 270.150 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.150 How will the Director make a final decision on my RAP application? (a) The Director must consider and respond to any significant...

  3. 40 CFR 270.215 - How are time periods in the requirements in this subpart and my RAP computed?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements in this subpart and my RAP computed? 270.215 Section 270.215 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.215 How are time periods in the requirements in this subpart and my RAP computed? (a) Any time period scheduled to begin...

  4. 40 CFR 270.130 - What is the process for approving or denying my application for a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... denying my application for a RAP? 270.130 Section 270.130 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.130 What is the process for approving or denying my application for a RAP? (a) If the Director tentatively finds that your...

  5. 40 CFR 270.175 - For what reasons may the Director choose to modify my final RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... choose to modify my final RAP? 270.175 Section 270.175 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.175 For what reasons may the Director choose to modify my final RAP? (a) The Director may...

  6. 40 CFR 270.90 - Does my RAP grant me any rights or relieve me of any obligations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Does my RAP grant me any rights or... PROGRAM Remedial Action Plans (RAPs) General Information § 270.90 Does my RAP grant me any rights or relieve me of any obligations? The provisions of § 270.4 apply to RAPs. (Note: The provisions of §...

  7. 40 CFR 270.130 - What is the process for approving or denying my application for a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... denying my application for a RAP? 270.130 Section 270.130 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.130 What is the process for approving or denying my application for a RAP? (a) If the Director tentatively finds that your...

  8. 40 CFR 270.170 - After my RAP is issued, how may it be modified, revoked and reissued, or terminated?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false After my RAP is issued, how may it be... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.170 After my RAP is issued, how may it be modified, revoked and reissued,...

  9. 40 CFR 270.170 - After my RAP is issued, how may it be modified, revoked and reissued, or terminated?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false After my RAP is issued, how may it be... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.170 After my RAP is issued, how may it be modified, revoked and reissued,...

  10. 40 CFR 270.150 - How will the Director make a final decision on my RAP application?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... decision on my RAP application? 270.150 Section 270.150 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.150 How will the Director make a final decision on my RAP application? (a) The Director must consider and respond to any significant...

  11. 40 CFR 270.215 - How are time periods in the requirements in this subpart and my RAP computed?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements in this subpart and my RAP computed? 270.215 Section 270.215 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.215 How are time periods in the requirements in this subpart and my RAP computed? (a) Any time period scheduled to begin...

  12. 40 CFR 270.175 - For what reasons may the Director choose to modify my final RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... choose to modify my final RAP? 270.175 Section 270.175 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.175 For what reasons may the Director choose to modify my final RAP? (a) The Director may...

  13. 40 CFR 270.155 - May the decision to approve or deny my RAP application be administratively appealed?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... RAP application be administratively appealed? 270.155 Section 270.155 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.155 May the decision to approve or deny my RAP application be administratively appealed? (a) Any commenter on the...

  14. 40 CFR 270.215 - How are time periods in the requirements in this subpart and my RAP computed?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements in this subpart and my RAP computed? 270.215 Section 270.215 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.215 How are time periods in the requirements in this subpart and my RAP computed? (a) Any time period scheduled to begin...

  15. 40 CFR 270.90 - Does my RAP grant me any rights or relieve me of any obligations?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Does my RAP grant me any rights or... PROGRAM Remedial Action Plans (RAPs) General Information § 270.90 Does my RAP grant me any rights or relieve me of any obligations? The provisions of § 270.4 apply to RAPs. (Note: The provisions of §...

  16. 40 CFR 270.215 - How are time periods in the requirements in this subpart and my RAP computed?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements in this subpart and my RAP computed? 270.215 Section 270.215 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.215 How are time periods in the requirements in this subpart and my RAP computed? (a) Any time period scheduled to begin...

  17. 40 CFR 270.90 - Does my RAP grant me any rights or relieve me of any obligations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Does my RAP grant me any rights or... PROGRAM Remedial Action Plans (RAPs) General Information § 270.90 Does my RAP grant me any rights or relieve me of any obligations? The provisions of § 270.4 apply to RAPs. (Note: The provisions of §...

  18. 40 CFR 270.165 - When may I begin physical construction of new units permitted under the RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of new units permitted under the RAP? 270.165 Section 270.165 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.165 When may I begin physical construction of new units permitted under the RAP? You must not begin physical construction of new...

  19. 40 CFR 270.130 - What is the process for approving or denying my application for a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... denying my application for a RAP? 270.130 Section 270.130 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.130 What is the process for approving or denying my application for a RAP? (a) If the Director tentatively finds that your...

  20. 40 CFR 270.225 - What must the State or EPA Region report about noncompliance with RAPs?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... report about noncompliance with RAPs? 270.225 Section 270.225 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.225 What must the State or EPA Region report about noncompliance with RAPs? The State or EPA Region must report noncompliance with...

  1. 40 CFR 270.90 - Does my RAP grant me any rights or relieve me of any obligations?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Does my RAP grant me any rights or... PROGRAM Remedial Action Plans (RAPs) General Information § 270.90 Does my RAP grant me any rights or relieve me of any obligations? The provisions of § 270.4 apply to RAPs. (Note: The provisions of §...

  2. 40 CFR 270.175 - For what reasons may the Director choose to modify my final RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... choose to modify my final RAP? 270.175 Section 270.175 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.175 For what reasons may the Director choose to modify my final RAP? (a) The Director may...

  3. 40 CFR 270.225 - What must the State or EPA Region report about noncompliance with RAPs?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... report about noncompliance with RAPs? 270.225 Section 270.225 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Operating Under Your Rap § 270.225 What must the State or EPA Region report about noncompliance with RAPs? The State or EPA Region must report noncompliance with...

  4. 40 CFR 270.165 - When may I begin physical construction of new units permitted under the RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of new units permitted under the RAP? 270.165 Section 270.165 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.165 When may I begin physical construction of new units permitted under the RAP? You must not begin physical construction of new...

  5. 40 CFR 270.175 - For what reasons may the Director choose to modify my final RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... choose to modify my final RAP? 270.175 Section 270.175 Protection of Environment ENVIRONMENTAL PROTECTION... PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.175 For what reasons may the Director choose to modify my final RAP? (a) The Director may...

  6. 40 CFR 270.170 - After my RAP is issued, how may it be modified, revoked and reissued, or terminated?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false After my RAP is issued, how may it be... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.170 After my RAP is issued, how may it be modified, revoked and reissued,...

  7. 40 CFR 270.155 - May the decision to approve or deny my RAP application be administratively appealed?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... RAP application be administratively appealed? 270.155 Section 270.155 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.155 May the decision to approve or deny my RAP application be administratively appealed? (a) Any commenter on the...

  8. 40 CFR 270.130 - What is the process for approving or denying my application for a RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... denying my application for a RAP? 270.130 Section 270.130 Protection of Environment ENVIRONMENTAL... PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.130 What is the process for approving or denying my application for a RAP? (a) If the Director tentatively finds that your...

  9. Remedial Action Plan for Fort Douglas

    DTIC Science & Technology

    1994-03-01

    of the Comprehensive Environmental Response, This Remedial Action Plan (RAP), issued by the U.S. Compensation, and Liability Act ( CERCLA ), also Army...Army), identifies the preferred alternatives for known as Superfund , and the National Environmental cleaning up electrical utility transformers and...transferred to the University of have generally followed guidance established in Utah. This transferred property is known as the CERCLA . The purpose of

  10. Remedial Action Plan for the codisposal and stabilization of the Monument Valley and Mexican Hat uranium mill tailings at Mexican Hat, Utah: Appendices C--E. Final report

    SciTech Connect

    1993-02-01

    This document provides appendices C, D, and E this Remedial Action Plan (RAP) which is a revision of the original Mexican Hat Remedial Action Plan and RAP Modification submitted in July 1988 and January 1989, respectively, along with updated design documents. Appendix C provide the Radiological Support Plan, Appendix D provides the Site Characterization, and Appendix E provides the Water Resources Protection Strategy.

  11. Planning as Action Research

    ERIC Educational Resources Information Center

    de Gonzalez, Carmen Beatriz; Hernandez, Teresa; Kusch, Jim; Ryan, Charly

    2004-01-01

    Planning contains so much more than the written plan. Early in 2000, an invitation came from the Collaborative Action Research Network (CARN), to people experienced in action research who might want to help plan and present an action research event for elementary school science teachers in Venezuela, South America, in Autumn 2000. This article…

  12. 40 CFR 270.220 - How may I transfer my RAP to a new owner or operator?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false How may I transfer my RAP to a new... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.220 How may I transfer my RAP to a new owner or operator? (a) If you wish to transfer your RAP to a new owner or operator, you must follow the...

  13. 40 CFR 270.220 - How may I transfer my RAP to a new owner or operator?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false How may I transfer my RAP to a new... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.220 How may I transfer my RAP to a new owner or operator? (a) If you wish to transfer your RAP to a new owner or operator, you must follow the...

  14. 40 CFR 270.220 - How may I transfer my RAP to a new owner or operator?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false How may I transfer my RAP to a new... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.220 How may I transfer my RAP to a new owner or operator? (a) If you wish to transfer your RAP to a new owner or operator, you must follow the...

  15. 40 CFR 270.220 - How may I transfer my RAP to a new owner or operator?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false How may I transfer my RAP to a new... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.220 How may I transfer my RAP to a new owner or operator? (a) If you wish to transfer your RAP to a new owner or operator, you must follow the...

  16. 40 CFR 270.220 - How may I transfer my RAP to a new owner or operator?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false How may I transfer my RAP to a new... Remedial Action Plans (RAPs) Operating Under Your Rap § 270.220 How may I transfer my RAP to a new owner or operator? (a) If you wish to transfer your RAP to a new owner or operator, you must follow the...

  17. 40 CFR 270.205 - What happens if I have applied correctly for a RAP renewal but have not received approval by the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... correctly for a RAP renewal but have not received approval by the time my old RAP expires? 270.205 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.205 What happens if I have...

  18. 40 CFR 270.145 - What are the procedures for public comment on the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... comment on the draft RAP or notice of intent to deny? 270.145 Section 270.145 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.145 What are the procedures for public comment on the draft RAP or notice of intent to deny? (a) The Director must: (1)...

  19. 40 CFR 270.205 - What happens if I have applied correctly for a RAP renewal but have not received approval by the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... correctly for a RAP renewal but have not received approval by the time my old RAP expires? 270.205 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.205 What happens if I have...

  20. 40 CFR 270.205 - What happens if I have applied correctly for a RAP renewal but have not received approval by the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... correctly for a RAP renewal but have not received approval by the time my old RAP expires? 270.205 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.205 What happens if I have...

  1. 40 CFR 270.140 - What else must the Director prepare in addition to the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... addition to the draft RAP or notice of intent to deny? 270.140 Section 270.140 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.140 What else must the Director prepare in addition to the draft RAP or notice of intent to deny? Once the Director...

  2. 40 CFR 270.145 - What are the procedures for public comment on the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... comment on the draft RAP or notice of intent to deny? 270.145 Section 270.145 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.145 What are the procedures for public comment on the draft RAP or notice of intent to deny? (a) The Director must: (1)...

  3. 40 CFR 270.140 - What else must the Director prepare in addition to the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... addition to the draft RAP or notice of intent to deny? 270.140 Section 270.140 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.140 What else must the Director prepare in addition to the draft RAP or notice of intent to deny? Once the Director...

  4. 40 CFR 270.145 - What are the procedures for public comment on the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... comment on the draft RAP or notice of intent to deny? 270.145 Section 270.145 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.145 What are the procedures for public comment on the draft RAP or notice of intent to deny? (a) The Director must: (1)...

  5. 40 CFR 270.140 - What else must the Director prepare in addition to the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... addition to the draft RAP or notice of intent to deny? 270.140 Section 270.140 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.140 What else must the Director prepare in addition to the draft RAP or notice of intent to deny? Once the Director...

  6. 40 CFR 270.140 - What else must the Director prepare in addition to the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... addition to the draft RAP or notice of intent to deny? 270.140 Section 270.140 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.140 What else must the Director prepare in addition to the draft RAP or notice of intent to deny? Once the Director...

  7. 40 CFR 270.140 - What else must the Director prepare in addition to the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... addition to the draft RAP or notice of intent to deny? 270.140 Section 270.140 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.140 What else must the Director prepare in addition to the draft RAP or notice of intent to deny? Once the Director...

  8. 40 CFR 270.205 - What happens if I have applied correctly for a RAP renewal but have not received approval by the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... correctly for a RAP renewal but have not received approval by the time my old RAP expires? 270.205 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.205 What happens if I have...

  9. 40 CFR 270.145 - What are the procedures for public comment on the draft RAP or notice of intent to deny?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... comment on the draft RAP or notice of intent to deny? 270.145 Section 270.145 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.145 What are the procedures for public comment on the draft RAP or notice of intent to deny? (a) The Director must: (1)...

  10. 40 CFR 270.205 - What happens if I have applied correctly for a RAP renewal but have not received approval by the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... correctly for a RAP renewal but have not received approval by the time my old RAP expires? 270.205 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.205 What happens if I have...

  11. 40 CFR 270.85 - When do I need a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false When do I need a RAP? 270.85 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.85 When do I need a RAP? (a) Whenever you treat, store, or dispose of...

  12. 40 CFR 270.85 - When do I need a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false When do I need a RAP? 270.85 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.85 When do I need a RAP? (a) Whenever you treat, store, or dispose of...

  13. 40 CFR 270.85 - When do I need a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false When do I need a RAP? 270.85 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.85 When do I need a RAP? (a) Whenever you treat, store, or dispose of...

  14. 40 CFR 270.85 - When do I need a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false When do I need a RAP? 270.85 Section...) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) General Information § 270.85 When do I need a RAP? (a) Whenever you treat, store, or dispose of...

  15. National Biofuels Action Plan

    DTIC Science & Technology

    2008-10-01

    Leading the Federal Interagency Biomass Research and Development Initiative October 2008 National Biofuels Action Plan Biomass Research and...REPORT DATE OCT 2008 2. REPORT TYPE 3. DATES COVERED 00-00-2008 to 00-00-2008 4. TITLE AND SUBTITLE National Biofuels Action Plan 5a. CONTRACT...goal of the National Biofuels Action Plan is to maximize the environmental and economic benefi ts of biofuels use by advancing sustainable practices

  16. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  17. 40 CFR 270.180 - For what reasons may the Director choose to revoke and reissue my final RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... choose to revoke and reissue my final RAP? 270.180 Section 270.180 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.180 For what reasons may the Director choose to revoke and reissue my final...

  18. 40 CFR 270.180 - For what reasons may the Director choose to revoke and reissue my final RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... choose to revoke and reissue my final RAP? 270.180 Section 270.180 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.180 For what reasons may the Director choose to revoke and reissue my final...

  19. 40 CFR 270.180 - For what reasons may the Director choose to revoke and reissue my final RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... choose to revoke and reissue my final RAP? 270.180 Section 270.180 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.180 For what reasons may the Director choose to revoke and reissue my final...

  20. 40 CFR 270.180 - For what reasons may the Director choose to revoke and reissue my final RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... choose to revoke and reissue my final RAP? 270.180 Section 270.180 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.180 For what reasons may the Director choose to revoke and reissue my final...

  1. 40 CFR 270.180 - For what reasons may the Director choose to revoke and reissue my final RAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... choose to revoke and reissue my final RAP? 270.180 Section 270.180 Protection of Environment... HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) How May My Rap Be Modified, Revoked and Reissued, Or Terminated? § 270.180 For what reasons may the Director choose to revoke and reissue my final...

  2. Benzidine Dyes Action Plan

    EPA Pesticide Factsheets

    This Action Plan addresses the use of benzidine-based dyes and benzidine congener-based dyes, both metalized and non-metalized, in products that would result in consumer exposure, such as for use to color textiles.

  3. What's an Asthma Action Plan?

    MedlinePlus

    ... to 2-Year-Old What's an Asthma Action Plan? KidsHealth > For Parents > What's an Asthma Action Plan? ... normal everyday activities without having asthma symptoms. Action Plans Are Unique Each person's experience with asthma is ...

  4. ES H action plan

    SciTech Connect

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  5. An Action Research Study on the Influence of Gangsta Rap on Academic and Behavioral Issues of 5th Grade African-American Males

    ERIC Educational Resources Information Center

    Lewis, Shaun; Boes, Susan R.; Chibbaro, Julie S.

    2015-01-01

    This small action research study (ARS) began with a review of the literature examining the relationship of gangsta rap in regards to academic achievement, self-esteem, decision-making, identity issues and development of young African American males. The purpose of the ARS was to examine the correlation between gangsta rap and its influence on 5th…

  6. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    In order to develop an affirmative action plan at Triton College, the college President appointed a committee made up of nine representatives from the various college constituencies, the majority of which were women and minorities, to determine the objectives to be achieved and how to implement them, and to establish appropriate review procedures.…

  7. 3RS action plan

    SciTech Connect

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  8. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1987-05-01

    This appendix assesses the present conditions and data for the inactive uranium mill site near Tuba City, Arizona. It consolidates available engineering, radiological, geotechnical, hydrological, meterological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill and tailings site so that the Remedial Action Contractor (RAC) may complete final designs of the remedial actions.

  9. Mitigation Action Plan

    SciTech Connect

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  10. A demonstration of the applicability of implementing the enhanced Remedial Action Priority System (RAPS) for environmental releases

    SciTech Connect

    Whelan, G.; Droppo, J.G. Jr.; Strenge, D.L.; Walter, M.B.; Buck, J.W.

    1989-12-01

    The Remedial Action Priority System (RAPS) and the Multimedia Environmental Pollutant Assessment System (MEPAS) were developed to prioritize problems associated with potential releases of hazardous chemical and radioactive materials in a scientific and objective manner based on limited site information. This report documents the model testing efforts of the RAPS/MEPAS methodology for the atmospheric, surface water, groundwater, and exposure components. Comparisons are given of model outputs with measured data at three sites: the US Department of Energy's Mound facility in Ohio and Hanford facility in Washington, and a chromium-cadmium plating site in New York. The results show that the simulated magnitudes, spacial and temporal trends, and distributions of contaminants corresponded well with the measured data. 25 refs., 86 figs., 26 tabs.

  11. Guam Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  12. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    SciTech Connect

    Not Available

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section}7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  13. On the development and implementation of ecosystem management plans for water resources in the Great Lakes: A case study of the RAP initiative

    SciTech Connect

    MacKenzie, S.H.

    1991-01-01

    The ecosystem approach to water resource management is deceptively simple: one must recognize the interrelationships among water, land, air, and all living things and undertake resource planning in such a way that the integrity of the natural system is preserved. Significant features of the ecosystem approach include its watershed boundaries, its holistic orientation, and its assumption that humans should be viewed as part of, rather than apart from, the natural system. A theme of environmental ethics and education underlies the approach. Although it seems straightforward, the ecosystem approach has important implications for water management. In 1985, the International Joint Commission challenged government agencies to utilize the ecosystem approach to develop Remedial Action Plans to rehabilitate forty-two hotspots across the Great Lakes Basin. This initiative represented a first effort to implement the ecosystem approach in the Great Lakes. The research questions were: what does ecosystem management mean in the context of the RAP process, and how can one increase the likelihood of successful implementation of ecosystem management plans The research proposition suggests that there are three preconditions to ecosystem management: participation; decision making; and legitimacy. Comparative case studies of Green Bay, Wisconsin; Saginaw Bay, Michigan; and Hamilton Harbor, Ontario were undertaken. Thirty-five RAP participants were chosen for on-site indepth interviews. Data were arrayed by respondent, question, and case, and were analyzed for content.

  14. Neuronal Rap1 regulates energy balance, glucose homeostasis, and leptin actions

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Central Nervous System (CNS) contributes to obesity and metabolic disease; however, the underlying neurobiological pathways remain to be fully established. Here, we show that the small GTPase Rap1 is expressed in multiple hypothalamic nuclei that control whole-body metabolism and is activated in...

  15. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall...

  16. What's an Asthma Action Plan?

    MedlinePlus

    ... so that you (as well as your child's teachers, relatives, and caregivers) can respond as needed, even in stressful situations. previous continue Putting the Plan to Good Use Your child's action plan will be most ...

  17. Plan of action. Information.

    PubMed

    Leduc, J W

    1996-11-01

    This article provides information on WHO¿s strategic plan of action to aid countries around the world in detecting and controlling emerging infectious diseases. Activities are conducted through an organizational structure that ensures cost-sharing among all the 190 member states of WHO. Four major goals incorporating specific tasks are suggested: 1) the strengthening of global surveillance of infectious diseases through WHO collaborating centers; 2) the rebuilding of the international infrastructure to recognize, report, and respond to emerging and resurgent infectious diseases through laboratory and communication improvement 3) the fostering of applied research through greater practical use of the biotechnological revolution, and 4) the enhancement of the international capacity for infectious disease prevention and control through defined and practical public health steps. To implement this program, a workshop has been conducted and the WHONET program for laboratories has been introduced. In addition, clear guidance will be needed on the question of when to make changes in the antimicrobials recommended for specific diseases. The WHO strategy aims to enhance the capacity of local and national public health laboratories, to foster applied research to address practical problems, and to improve infectious disease prevention and control.

  18. Plan for early action: Recommendations

    SciTech Connect

    1998-12-31

    This report contains recommendations on the implementation of an action plan to reduce or recapture greenhouse gas (GHG) emissions in British Columbia. The report includes the consensus recommendations of the BC Greenhouse Gas Forum, as well as those items on which Forum participants have agreed to disagree, plus the reasons for those differences. The recommendations include: Umbrella actions which may affect several or all sectors of the economy, or support the success of other actions; actions to reduce vehicle kilometers travelled; actions to increase vehicle efficiency or increase the use of alternative fuels or technologies; actions to decrease GHG emissions from energy production; actions to increase end-use energy efficiency; and actions to reduce non-energy-related emissions. Appendices include work sheets on each action, with a description of the action and information on the action`s rationale, experience elsewhere, related policy initiatives, and key issues regarding feasibility and implementation.

  19. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  20. Final record of decision/remedial action plan, nine sites, Sierra Army Depot, Lassen County, California

    SciTech Connect

    Arroyo, S.L.; Larson, A.M.; Parent, M.M.; Silvers, J.M.; Weaverling, P.H.

    1996-10-01

    This ROD/RAP presents the selected response actions for nine sites at SIAD. The response actions were selected by the US Department of the Army (Army) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments Reauthorization Act of 1986 (SARA)(collectively referred to as CERCLA), the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), and Section 6.8 of the California Health and Safety Code. This ROD/RAP includes the factual and legal basis for selecting the response action at each of the nine sites listed above. The data used to support the selected response action are contained in the Administrative Record for each site. The State of California as represented by the Department of Toxic Substances Control (DTSC), and the Lahontan Regional Water Quality Control Board (RWQCB) concur with the selected response action at each site.

  1. 40 CFR 270.155 - May the decision to approve or deny my RAP application be administratively appealed?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false May the decision to approve or deny my... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Remedial Action Plans (RAPs) Getting A Rap Approved § 270.155 May...

  2. National Wetlands Mitigation Action Plan

    EPA Pesticide Factsheets

    On December 26, 2002, EPA and the Corps of Engineers announced the release of a comprehensive, interagency National Wetlands Mitigation Action Plan to further achievement of the goal of no net loss of wetlands.

  3. Toluene Diisocyanates (TDI) Action Plan

    EPA Pesticide Factsheets

    This Action Plan addresses the use of toluene diisocyanate (TDI) and related compounds in products that may result in consumer and general population exposures, particularly in or around buildings, including homes and schools.

  4. Action Understanding as Inverse Planning

    ERIC Educational Resources Information Center

    Baker, Chris L.; Saxe, Rebecca; Tenenbaum, Joshua B.

    2009-01-01

    Humans are adept at inferring the mental states underlying other agents' actions, such as goals, beliefs, desires, emotions and other thoughts. We propose a computational framework based on Bayesian inverse planning for modeling human action understanding. The framework represents an intuitive theory of intentional agents' behavior based on the…

  5. American Samoa: Energy Action Plan

    SciTech Connect

    Ness, J. Erik; Haase, Scott; Conrad, Misty

    2016-09-01

    This document outlines actions being taken to reduce American Samoa's petroleum consumption. It describes the four near-term strategies selected by the American Samoa Renewable Energy Committee during action-planning workshops conducted in May 2016, and describes the steps that will need to be taken to implement those strategies.

  6. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona. Apendix D, Site characteriztion

    SciTech Connect

    Not Available

    1987-05-01

    This appendix assesses the present conditions and data for the inactive uranium mill site near Tuba City, Arizona. It consolidates available engineering, radiological, geotechnical, hydrological, meterological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill and tailings site so that the Remedial Action Contractor (RAC) may complete final designs of the remedial actions.

  7. Affirmative Action Plan.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh.

    This affirmative action (AA) guide is intended to identify and remove discriminatory employment practices that may still exist in the North Carolina State Department of Public Instruction (DPI). DPI extends equal employment opportunity (EEO) to all applicants and employees without regard to race, color, religion, sex, age, handicap, political…

  8. American Samoa Energy Action Plan

    SciTech Connect

    Haase, Scott; Esterly, Sean; Herdrich, David; Bodell, Tim; Visser, Charles

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  9. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan,...

  10. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  11. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and...

  12. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    SciTech Connect

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  13. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.320 Section 91.320... Consolidated Plan § 91.320 Action plan. The action plan must include the following: (a) Standard Form 424; (b) A concise executive summary that includes the objectives and outcomes identified in the plan as...

  14. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.220 Section 91.220... Consolidated Plan § 91.220 Action plan. The action plan must include the following: (a) Standard Form 424; (b) A concise executive summary that includes the objectives and outcomes identified in the plan as...

  15. One School's Positive Action Plan.

    ERIC Educational Resources Information Center

    McCormack, Sammie

    Because they felt that students can be responsible for their own behavior, the staff of Jefferson Elementary School, serving 300 students in grades 1 through 4 in a small rural community, developed a program which promoted self-management. In September 1979, teachers participated in an assertive discipline workshop. A Positive Action Plan evolved,…

  16. Texas Solar Collaboration Action Plan

    SciTech Connect

    Winland, Chris

    2013-02-14

    Texas Solar Collaboration Permitting and Interconenction Process Improvement Action Plan. San Antonio-specific; Investigate feasibility of using electronic signatures; Investigate feasibility of enabling other online permitting processes (e.g., commercial); Assess need for future document management and workflow/notification IT improvements; Update Information Bulletin 153 regarding City requirements and processes for PV; Educate contractors and public on CPS Energy’s new 2013 solar program processes; Continue to discuss “downtown grid” interconnection issues and identify potential solutions; Consider renaming Distributed Energy Resources (DER); and Continue to participate in collaborative actions.

  17. Hungarian climate change action plan

    SciTech Connect

    Molnar, S.; Takacs, T.; Arpasi, M.; Farago, T.; Palvoelgyi, T.; Harnos, Z.; Lontay, Z.; Somogyi, Z.; Tajthy, T.

    1998-12-31

    In 1994--1996, within the framework of the US Country Studies Program, the Hungarian Country Study Team developed the national greenhouse gas emission inventory, and elaborated the mitigation options for the different sectors of the economy. In 1997, the development of a National Action Plan was begun as the continuation of this work. Results of the inventory study showed that greenhouse gas emissions decreased from the selected base level (i.e., from the yearly average emissions of 1985--1987) until 1994 by cca. 25%. However, this decrease was primarily caused by the deep economic recession. Therefore the policy makers have to face the problem of economic recovery without a relevant increase of greenhouse gas emissions in the near future. This is the main focus of the mitigation analysis and the National Action Plan.

  18. Developing a Global Green Freight Action Plan

    EPA Pesticide Factsheets

    This Climate and Clean Air Coalition (CCAC) presentation gives an overview of the Global Green Freight Action Plan to improve the energy efficiency and environmental performance of freight operations worldwide along with developing an action plan.

  19. Final Federal Radon Action Plan Scorecard

    EPA Pesticide Factsheets

    This page provides information and a link to the draft Federal Radon Action Plan. It also contains a Federal Radon Action Plan Scorecard, a tool designed to display the current status of each federal agency commitments and outcomes to date.

  20. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Appendix E. Final report

    SciTech Connect

    1988-07-01

    This document provides Appendix E of the Remedial Action Plan (RAP) presented in 1988 for the stabilization of the inactive uranium mill tailings at the Mexican Hat, Utah site. The RAP was developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. The RAP has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action.

  1. Corrective Action Planning for Environmental Compliance Deficiencies

    SciTech Connect

    Sigmon, C. F.; Ashburn, S. A.; Jolley, R. L.; Smith, A. A.; Mercer, A. E.; Oeulette, B.; Renz, K.; Scott, S.

    1995-01-01

    Effective corrective action planning is one of the cornerstones of an effective environmental management program. Alternatively, ineffective planning can highlight an installation`s unwillingness or inability to effectively address environmental compliance deficiencies. The following paper discusses several guidelines to consider in corrective action planning to ensure that plans benefit rather than harm an installation`s overall environmental management program.

  2. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Consortia; Contents of Consolidated Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a Standard Form 424 for the consortium for the HOME program. Each entitlement jurisdiction also must submit...

  3. Remedial action plan for stabilization of the inactive uranium mill tailings site at Monument Valley, Arizona

    SciTech Connect

    1986-02-01

    This Remedial Action Plan (RAP) has been developed to serve a two-fold purpose. It presents the series of activities which are proposed by the U.S. Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Monument Valley, Arizona It also serves to document the concurrence of both the Navajo Nation and the U.S. Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

  4. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    SciTech Connect

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  5. National Action Plan for Energy Efficiency Report

    EPA Pesticide Factsheets

    This seminal report includes the Action Plan recommendations, identifies key barriers, and summarizes methods for energy efficiency in utility ratemaking and revenue requirements, energy resource planning processes, rate design, and other best practices.

  6. 76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... To Combat Antimicrobial Resistance AGENCY: Centers for Disease Control and Prevention (CDC... the draft, A Public Health Action Plan to Combat Antimicrobial Resistance (76 FR 14402). Written and..., Office of Antimicrobial Resistance, Attn: Antimicrobial Resistance Action Plan, Docket No....

  7. Exploiting map plans as resources for action

    NASA Technical Reports Server (NTRS)

    Payton, David

    1989-01-01

    When plans are used as programs for controlling the action of autonomous or teleoperated robots, their abstract representation can easily obscure a great deal of the critical knowledge that originally led to the planned course of action. An autonomous vehicle experiment is highlighted which illustrates how the information barriers created by abstraction can result in undesirable action. It is then shown how the same task can be performed correctly using plans as a resource for action. As a result of this simple change in outlook, problems requiring opportunistic reaction to unexpected changes in the environment can be solved.

  8. Planning actions in robot automated operations

    NASA Technical Reports Server (NTRS)

    Das, A.

    1988-01-01

    Action planning in robot automated operations requires intelligent task level programming. Invoking intelligence necessiates a typical blackboard based architecture, where, a plan is a vector between the start frame and the goal frame. This vector is composed of partially ordered bases. A partial ordering of bases presents good and bad sides in action planning. Partial ordering demands the use of a temporal data base management system.

  9. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report

    SciTech Connect

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose. First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.

  10. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Chernoff, A.R. . Uranium Mill Tailings Remedial Action Project Office); Lacker, D.K. . Bureau of Radiation Control)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  11. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report. Revised final report

    SciTech Connect

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose. First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.

  12. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Remedial action selection report, Attachment 2, Geology report: Preliminary final

    SciTech Connect

    Not Available

    1993-08-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this document and the rest of the RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the State of Colorado.

  13. The Development of Action Planning in a Joint Action Context

    ERIC Educational Resources Information Center

    Paulus, Markus

    2016-01-01

    The ability to act jointly with another person is a fundamental requirement for participation in social life. The current study examines the development of action planning in a joint action context. In 4 experiments, 3-, 5-, and 7-year-old children as well as a group of adults (n = 196) interacted with another person to operate a novel apparatus.…

  14. The Fluids RAP

    NASA Astrophysics Data System (ADS)

    Nedyalkov, Ivaylo

    2016-11-01

    After fifteen years of experience in rap, and ten in fluid mechanics, "I am coming here with high-Reynolds-number stamina; I can beat these rap folks whose flows are... laminar." The rap relates fluid flows to rap flows. The fluid concepts presented in the song have varying complexity and the listeners/viewers will be encouraged to read the explanations on a site dedicated to the rap. The music video will provide an opportunity to share high-quality fluid visualizations with a general audience. This talk will present the rap lyrics, the vision for the video, and the strategy for outreach. Suggestions and comments will be welcomed.

  15. The Climate Change Action Plan: Technical supplement

    SciTech Connect

    Not Available

    1994-03-01

    This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

  16. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  17. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  18. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  19. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  20. 47 CFR 214.4 - Planned actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COORDINATION OF THE RADIO SPECTRUM DURING A WARTIME EMERGENCY § 214.4 Planned actions. (a) Whenever it is... the use of the radio spectrum in areas of active combat, where such control is necessary to...

  1. National Security Technology Incubator Action Plan

    SciTech Connect

    None, None

    2008-02-28

    This report documents the action plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). This action plan serves as a tool in measuring progress in the development process and delivery of services for the NSTI program. Continuous review and evaluation of the action plan is necessary in the development process of the NSTI. The action plan includes detailed steps in developing the NSTI program based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Included are tasks required to implement the NSTI, developed within a work breakdown structure. In addition, a timeline is identified for each task.

  2. World Plan of Action: Decade for Women.

    ERIC Educational Resources Information Center

    Women's Equity Action League, Washington, DC.

    The World Plan of Action adopted by the United Nations World Conference of the International Women's Year in Mexico City in July 1975 is presented in condensed form. The major purpose is to provide guidelines for national action over the ten-year period 1975-1985 as part of a sustained, long-term effort to achieve the objectives of International…

  3. Gathering Strength: Canada's Aboriginal Action Plan.

    ERIC Educational Resources Information Center

    Department of Indian Affairs and Northern Development, Ottawa (Ontario).

    Designed to renew the relationship between the Canadian government and the Aboriginal peoples of Canada, this action plan contains a statement of reconciliation, a statement of renewal, and four key objectives for action. First, renewing partnerships includes community-based healing to address the negative effects of the residential schools…

  4. Put your development plan into action.

    PubMed

    Day-Calder, Mandy

    2017-04-05

    Having completed your appraisal, you will have a plan for the year ahead. Hopefully you have learned from your appraisal discussion and feel motivated. But to have a successful year ahead and grow as a nursing professional, you will need to turn your personal development plan (PDP) into action. Here we look at ways you can do so without feeling overwhelmed.

  5. Action Planning and Recording Achievement.

    ERIC Educational Resources Information Center

    Green, Muriel

    This document examines strategies and procedures that British further education (FE) colleges can use to develop and enhance systems and structures for guiding and supporting learners and learning. It is based on the findings of a field test of the Managing Learning model for planning and recording the process of FE students. First, the importance…

  6. Modification No. 2 to the remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Green River, Utah: Final

    SciTech Connect

    1996-11-01

    Portions of the final Remedial Action Plan (RAP) for the Green River site, Volumes 1 and 2, Appendix B of the Cooperative Agreement No. DE-FC04-81AL16257, March 1991 (DOE, 1991) have been modified. The changes to the RAP are designated as RAP Modification No. 2. These changes have been placed in a three-ring binder that will supplement the original RAP (DOE, 1991), and include the following: addendum to the Executive Summary; Section 3.5 (Ground Water part of the Site Characterization Summary); Section 4.0 (Site Design); Section5.0 (Water Resources Protection Strategy Summary); Appendix D.5 (Ground Water Hydrology); and Appendix E (Ground Water Protection Strategy). In addition to these revisions, there have been editorial changes that clarify the text, but do not change the meaning. Also, certain sections of the document, which are included in the submittal for ease of review and continuity, have been updated to reflect the final ground water protection standards and the current UMTRA Project format and content of RAPs.

  7. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    SciTech Connect

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  8. Final Record of Decision/Remedial Action Plan, Nine Sites, Sierra Army Depot, Lassen County, California.

    DTIC Science & Technology

    1996-10-01

    section provides the declaration portion of the ROD /RAP for the Construction Debris Landfill. 5.1.1 Location The Construction Debris Landfill is...and Role of Response Action This ROD /RAP presents the final response action for the Construction Debris Landfill. This site poses no potential threat...AMMUNITION DEMILITARIZATION AND RENOVATION AREA BUILDING 1003 AREA CHEMICAL BURIAL SITE CONSTRUCTION DEBRIS LANDFILL EXISTING LANDFILL EXISTING

  9. 76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... To Combat Antimicrobial Resistance AGENCY: Centers for Disease Control and Prevention (CDC... Action Plan to Combat Antimicrobial Resistance. HHS/CDC is publishing this notice on behalf of the HHS Interagency Task Force on Antimicrobial Resistance. The draft Action Plan and supporting documents can...

  10. Final Action Plan to Tiger Team

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  11. ICDF Complex Remedial Action Work Plan

    SciTech Connect

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  12. 7 CFR 275.16 - Corrective action planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which:...

  13. Action plan for the Tiger Team assessment report

    SciTech Connect

    Not Available

    1990-08-30

    This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

  14. Action Plan for Florida's Public Libraries. Addendum.

    ERIC Educational Resources Information Center

    Florida Library Study Commission, Tallahassee.

    The introduction to this addendum (the Action Plan is LI 004 521) discusses the present use by libraries of information-handling technology and identifies some of the trends taking place in performing essential library services. While some limited inroads have been made in automating certain public library functions, the bulk of services is still…

  15. Triton College Faculty Recruitment Action Plan (FRAP).

    ERIC Educational Resources Information Center

    Triton Coll., River Grove, IL.

    Triton College's (Illinois) Faculty Recruitment Action Plan (FRAP) provides a detailed guide to hiring new faculty, focusing on the desired characteristics of new faculty; marketing and recruitment strategies; employment incentives; the application, interviewing, and selection process; new faculty orientation; a timeline for implementation; cost…

  16. Chemical Safety for Sustainability: Research Action Plan

    EPA Pesticide Factsheets

    The Strategic Research Action Plan for EPA’s Chemical Safety for Sustainability research program presents the purpose, design and themes of the Agency’s research efforts to ensure safety in the design, manufacture and use of existing and future chemicals.

  17. Emergency Action Plans in Physical Education

    ERIC Educational Resources Information Center

    Tanis, Cindy J.; Hebel, Susan L.

    2016-01-01

    Emergency Action Plans (EAP) are essential to properly manage injuries and illnesses in physical education and sport. However, most literature discusses EAP's in the athletic arena instead of physical education. The purpose of this study was to examine physical education instructors' experiences of student illness and injury, discuss the steps of…

  18. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park...

  19. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park...

  20. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park...

  1. 36 CFR 72.13 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK... objectives, priorities and implementation strategies in relation to the intent of the Urban Park...

  2. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Remedial Action Selection Report, Appendix B of Attachment 2: Geology report, Final

    SciTech Connect

    Not Available

    1994-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section} 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which describes the proposed remedial action for the Naturita site. An extensive amount of data and supporting information has been generated and evaluated for this remedial action. These data and supporting information are not incorporated into this single document but are included or referenced in the supporting documents. The RAP consists of this RAS and four supporting documents or attachments. This Attachment 2, Geology Report describes the details of geologic, geomorphic, and seismic conditions at the Dry Flats disposal site.

  3. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    SciTech Connect

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  4. National Biofuels Action Plan, October 2008

    SciTech Connect

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  5. India's National Action Plan on Climate Change

    PubMed Central

    Pandve, Harshal T.

    2009-01-01

    Climate change is one of the most critical global challenges of our times. Recent events have emphatically demonstrated our growing vulnerability to climate change. Climate change impacts will range from affecting agriculture – further endangering food security – to sea-level rise and the accelerated erosion of coastal zones, increasing intensity of natural disasters, species extinction, and the spread of vector-borne diseases. India released its much-awaited National Action Plan on Climate Change (NAPCC) to mitigate and adapt to climate change on June 30, 2008, almost a year after it was announced. The NAPCC runs through 2017 and directs ministries to submit detailed implementation plans to the Prime Minister's Council on Climate Change by December 2008. This article briefly reviews the plan and opinion about it from different experts and organizations. PMID:20165607

  6. 24 CFR 248.217 - Revisions to plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AUTHORITIES PREPAYMENT OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income Preservation Act of 1987 § 248.217 Revisions to plan of action. The owner may from time to...

  7. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... action plan. 906.4 Section 906.4 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT... action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... such as legal, architectural, engineering, and financial; (3) Purchasing materials and supplies...

  8. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report: Attachment 2, Geology report; Attachment 3, Groundwater hydrology report; Attachment 4, Water resources protection strategy: Final report

    SciTech Connect

    Chernoff, A.R.; Lacker, D.K.

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  9. 43 CFR 3482.2 - Action on plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Exploration and Resource Recovery and Protection Plans § 3482.2 Action on plans. (a)(1) Exploration plans. The... with the approval terms of the exploration plan. (2) Resource recovery and protection plans. No resource recovery and protection plan or modification thereto shall be approved which is not in...

  10. 43 CFR 3482.2 - Action on plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Exploration and Resource Recovery and Protection Plans § 3482.2 Action on plans. (a)(1) Exploration plans. The... with the approval terms of the exploration plan. (2) Resource recovery and protection plans. No resource recovery and protection plan or modification thereto shall be approved which is not in...

  11. 43 CFR 3482.2 - Action on plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Exploration and Resource Recovery and Protection Plans § 3482.2 Action on plans. (a)(1) Exploration plans. The... with the approval terms of the exploration plan. (2) Resource recovery and protection plans. No resource recovery and protection plan or modification thereto shall be approved which is not in...

  12. 43 CFR 3482.2 - Action on plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Exploration and Resource Recovery and Protection Plans § 3482.2 Action on plans. (a)(1) Exploration plans. The... with the approval terms of the exploration plan. (2) Resource recovery and protection plans. No resource recovery and protection plan or modification thereto shall be approved which is not in...

  13. Affirmative Action Plan, October 1991--September 1992

    SciTech Connect

    Not Available

    1991-10-01

    This report documents Reynolds Electrical Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the Handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations. All personnel decisions are made at the Company level. Decisions regarding the General Manager or Deputy General Manager are made at the corporate level.

  14. Structural basis of Rap phosphatase inhibition by Phr peptides.

    PubMed

    Gallego del Sol, Francisca; Marina, Alberto

    2013-01-01

    Two-component systems, composed of a sensor histidine kinase and an effector response regulator (RR), are the main signal transduction devices in bacteria. In Bacillus, the Rap protein family modulates complex signaling processes mediated by two-component systems, such as competence, sporulation, or biofilm formation, by inhibiting the RR components involved in these pathways. Despite the high degree of sequence homology, Rap proteins exert their activity by two completely different mechanisms of action: inducing RR dephosphorylation or blocking RR binding to its target promoter. However the regulatory mechanism involving Rap proteins is even more complex since Rap activity is antagonized by specific signaling peptides (Phr) through a mechanism that remains unknown at the molecular level. Using X-ray analyses, we determined the structure of RapF, the anti-activator of competence RR ComA, alone and in complex with its regulatory peptide PhrF. The structural and functional data presented herein reveal that peptide PhrF blocks the RapF-ComA interaction through an allosteric mechanism. PhrF accommodates in the C-terminal tetratricopeptide repeat domain of RapF by inducing its constriction, a conformational change propagated by a pronounced rotation to the N-terminal ComA-binding domain. This movement partially disrupts the ComA binding site by triggering the ComA disassociation, whose interaction with RapF is also sterically impaired in the PhrF-induced conformation of RapF. Sequence analyses of the Rap proteins, guided by the RapF-PhrF structure, unveil the molecular basis of Phr recognition and discrimination, allowing us to relax the Phr specificity of RapF by a single residue change.

  15. Remedial Action Plan and final design for stabilization of the inactive uranium mill tailings at Green River, Utah. Volume 1, Text, Appendices A, B, and C: Final report

    SciTech Connect

    Matthews, M.L.; Alkema, K.

    1991-03-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities that are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Green River, Utah. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the state of Utah and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state of Utah, and concurrence by the NRC, becomes Appendix 8 of the Cooperative Agreement.

  16. Remedial Action Plan for the codisposal and stabilization of the Monument Valley and Mexican Hat uranium mill tailings at Mexican Hat, Utah

    SciTech Connect

    1993-02-01

    This document is a revision of the original Mexiacan Hat Remedial Action Plan (RAP) and RAP Modification submitted in July 1988 and January 1989, respectively, along with updated design documents. This RAP has been developed to serve a two-fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3. 0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 presents the water resources protection strategy. Section 6.0 summarizes the plan for ensuring health and safety protection for the surrounding community and the on- site workers. Section 7.0 lists the responsibilities of the project participants. Section 8.0 describes the features of the long-term surveillance and maintenance plan.

  17. Clean slate corrective action investigation plan

    SciTech Connect

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

  18. SADC establishes a regional action plan.

    PubMed

    Klouda, T

    1997-02-01

    The regional meeting held on AIDS strategy in Lilongwe, Malawi, in December, 1996, made important advances. The 12 countries of the SADC (Southern Africa Development Community) joined the European Union to institute a regional action plan for the reduction of susceptibility of people to HIV because of social, cultural, and environmental factors; the vulnerability of people with HIV infection to social and other difficulties; and the vulnerability of institutions because of the foregoing impacts. At the conference the issues explored were employment, mining, medical drugs, education, and tourism. An employment charter was seen as crucial for the success of AIDS and workplace activities. Facilitation of travel across borders was important for the reduction of susceptibility to HIV infection. Enhancement of regional policies for essential drugs was vital for drugs for the treatment of AIDS. The clarification of the regional role was critical for regional support of national action (strengthening technical and institutional capacities) and for regional joint action such as studies on research, harmonization of data collection on HIV/AIDS; organization of training; development of information and education on HIV/AIDS; facilitation of manufacturing of drugs and condoms; and the development of a regional information and education program about HIV/AIDS. The conference also clarified HIV/AIDS programs in relation to other health and socioeconomic problems.

  19. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 543: LIQUID DISPOSAL UNITS, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2006-09-01

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved Corrective Action Decision Document.

  20. 78 FR 42071 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance... the public comment period for the proposed guidance ``PAG Manual: Protective Action Guides (PAGs)...

  1. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. Remedial action selection report: Attachment 2, geology report; Attachment 3, ground water hydrology report; Attachment 4, supplemental information

    SciTech Connect

    1998-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the U.S. Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section} 7901 et seq. Part of the UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, becomes Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  2. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... management activities under a RAP at a location removed from the area where the remediation wastes originated... Plans (RAPs) Obtaining A Rap for An Off-Site Location § 270.230 May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes...

  3. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management activities under a RAP at a location removed from the area where the remediation wastes originated... Plans (RAPs) Obtaining A Rap for An Off-Site Location § 270.230 May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes...

  4. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Consortia; Contents of Consolidated... to be undertaken to pursue its strategic plan. The consolidated plan must provide this...

  5. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  6. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  7. 28 CFR 115.404 - Audit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding...

  8. Plans and Social Actions. Technical Report No. 34.

    ERIC Educational Resources Information Center

    Bruce, Bertram

    Our understanding of a story is highly dependent upon our ability to recognize the underlying purpose for actions described in the story. We need to view those actions as steps in, or reactions to, plans. This paper sketches some of the components of a model for the understanding of plans and social actions. The model is first applied to narrative…

  9. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Spook, Wyoming

    SciTech Connect

    Matthews, M L; Sullivan, M

    1990-04-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at an inactive uranium processing site northeast of Casper, Wyoming, and referred to as the Spook site. It provides a characterization of the present conditions at the site and also serves to document the concurrence of the State of Wyoming and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the State of Wyoming, and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement.

  10. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho. Final report

    SciTech Connect

    Matthews, M.L.; Nagel, J.

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho.

  11. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho

    SciTech Connect

    Matthews, M.L. . Uranium Mill Tailings Remedial Action Project Office); Nagel, J. . Div. of Environmental Quality)

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho.

  12. High altitude mine waste remediation -- Implementation of the Idarado remedial action plan

    SciTech Connect

    Hardy, A.J.; Redmond, J.V.; River, R.A.; Davis, C.S.

    1999-07-01

    The Idarado Mine in Colorado's San Juan Mountains includes 11 tailing areas, numerous waste rock dumps, and a large number of underground openings connected by over 100 miles of raises and drifts. The tailings and mine wastes were generated from different mining and milling operations between 1975 and 1978. the Idarado Remedial Action Plan (RAP) was an innovative 5-year program developed for remediating the impacts of historic mining activities in the San Miguel River and Red Mountain Creek drainages. The challenges during implementation included seasonal access limitations due to the high altitude construction areas, high volumes of runoff during snow melt, numerous abandoned underground openings and stopped-out veins, and high profile sites adjacent to busy jeep trails and a major ski resort town. Implementation of the RAP has included pioneering efforts in engineering design and construction of remedial measures. Innovative engineering designs included direct revegetation techniques for the stabilization of tailings piles, concrete cutoff walls and French drains to control subsurface flows, underground water controls that included pipelines, weeplines, and portal collection systems, and various underground structures to collect and divert subsurface flows often exceeding 2,000 gpm. Remote work locations have also required the use of innovative construction techniques such as heavy lift helicopters to move construction materials to mines above 10,000 feet. This paper describes the 5-year implementation program which has included over 1,000,000 cubic yards of tailing regrading, application of 5,000 tons of manure and 26,000 tons of limestone, and construction of over 10,000 feet of pipeline and approximately 45,000 feet of diversion channel.

  13. ORD Strategic Action Plan for Information Management / Information Technology 2011

    EPA Science Inventory

    ORD's Strategic Action Plan for IM/IT (2011) was collaboratively developed with input from ORD research and administrative personnel. It identifies actions necessary to support ORD's priority IM and IT needs.

  14. Rap Music in the Classroom?

    ERIC Educational Resources Information Center

    Anderson, Edward

    1993-01-01

    Discusses the background of rap music, its definition, its themes and messages, and rap as a blend of language and music. Offers ideas for its use in the classroom as a way to motivate and instruct students. (SR)

  15. On the Inclusion of Externally Controlled Actions in Action Planning

    ERIC Educational Resources Information Center

    Tsai, Jessica Chia-Chin; Knoblich, Gunther; Sebanz, Natalie

    2011-01-01

    According to ideomotor theories, perceiving action effects produced by others triggers corresponding action representations in the observer. We tested whether this principle extends to actions performed by externally controlled limbs and tools. Participants performed a go-no-go version of a spatial compatibility task in which their own actions…

  16. Features of planned hand actions influence identification of graspable objects.

    PubMed

    Bub, Daniel N; Masson, Michael E J; Lin, Terry

    2013-07-01

    We demonstrate that constituents of motor actions associated with handled objects play a role in identifying such objects. Subjects held in working memory action plans for reaching movements; these action plans specified both the hand to be used (left or right) and a wrist orientation (vertical or horizontal). Speeded object identification was impaired when a pictured object matched the action on only one of these two categorical dimensions (e.g., a beer mug with its handle facing left, an action plan involving the right hand and vertical wrist orientation), relative to when the object matched the action on both dimensions or neither dimension. This result implies that identification of a manipulable object leads to automatic retrieval of matching features of a planned action along with nonmatching features to which they are bound. These discrepant features conflict with those of the target object, which results in delayed identification.

  17. 12 CFR 704.10 - Investment action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Investment action plan. 704.10 Section 704.10... CREDIT UNIONS § 704.10 Investment action plan. (a) Any corporate credit union in possession of an investment, including a derivative, that fails to meet a requirement of this part must, within 30...

  18. 29 CFR 1910.38 - Emergency action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... action plan must include at a minimum: (1) Procedures for reporting a fire or other emergency; (2) Procedures for emergency evacuation, including type of evacuation and exit route assignments; (3) Procedures... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action...

  19. 29 CFR 1910.38 - Emergency action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... action plan must include at a minimum: (1) Procedures for reporting a fire or other emergency; (2) Procedures for emergency evacuation, including type of evacuation and exit route assignments; (3) Procedures... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action...

  20. Education for All: National Plan of Action, 2003-2015

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    Background: The Lao People's Democratic Republic (PDR) Education for All National Plan of Action (EFA NPA) for 2003-2015 seeks to accomplish three major tasks: equitable access, improved quality and relevance and strengthened education management. Purpose: To design a National Education For All Action Plan for basic education in Lao PDR which…

  1. Indiana's Comprehensive Action Plan for Adult Education Programs.

    ERIC Educational Resources Information Center

    Indiana State Dept. of Education, Indianapolis.

    Indiana's Comprehensive Action Plan (I-CAP) provides a framework for program excellence, accountability, and continuous improvement in adult education. The action plan includes guiding principles and benchmarks for quality programs. Adult education programs are evaluated annually on these 10 established principles of program quality: educational…

  2. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document is a compilation of different issues identified by the Tiger Teams at the several locations of the Sandia National Laboratory. In this volume there are findings/concerns and the resultant responses and planned actions for these issues. Also included are the schedules and costs for the planned actions.

  3. Adult Basic Skills: Developing a Local Action Plan.

    ERIC Educational Resources Information Center

    Basic Skills Agency, London (England).

    This document presents advice from the United Kingdom's Basic Skills Agency regarding developing local action plans. The first 20% of the document defines basic skills and discusses the following action plan components: (1) an estimate of the area's need for basic skills training; (2) a target to reduce the area's estimated scale of need; (3)…

  4. Creative Technology and Rap

    ERIC Educational Resources Information Center

    Ch'ien, Evelyn

    2011-01-01

    This paper describes how a linguistic form, rap, can evolve in tandem with technological advances and manifest human-machine creativity. Rather than assuming that the interplay between machines and technology makes humans robotic or machine-like, the paper explores how the pressure of executing artistic visions using technology can drive…

  5. Squaring to the Rap!

    ERIC Educational Resources Information Center

    Adams, Deborah

    2006-01-01

    This article describes an approach to teaching square dance that is advantageous for both the teacher and students. Lessons in dance become more meaningful to students when the music and vocabulary is consistent with experiences in their own lives. When students create their own squaring to the rap, lessons become more student-centered,…

  6. Clean Slate 1 Corrective Action Plan, Revision 0

    SciTech Connect

    1997-04-01

    This Corrective Action Plan (CAP) has been prepared to meet the requirements specified in the Federal Facility Agreement and Consent Order (FFACO, 1996). A Corrective Action Decision Document (CADD) (DOE, 1997) was submitted to the Nevada Department of Environmental Protection (NDEP) January 31, 1997 for the Clean Slate 1 (CS-1) Site in accordance with the Corrective Action Investigation Plan (CAIP) (DOE, 1996) and the Soils Media Operable Unit Quality Assurance Project Plan (DOE, 1995). The FFACO lists CS-1 as Corrective Action Unit (CAU) number 412.

  7. The role of action control and action planning on fruit and vegetable consumption.

    PubMed

    Zhou, Guangyu; Gan, Yiqun; Miao, Miao; Hamilton, Kyra; Knoll, Nina; Schwarzer, Ralf

    2015-08-01

    Globally, fruit and vegetable intake is lower than recommended despite being an important component to a healthy diet. Adopting or maintaining a sufficient amount of fruit and vegetables in one's diet may require not only motivation but also self-regulatory processes. Action control and action planning are two key volitional determinants that have been identified in the literature; however, it is not fully understood how these two factors operate between intention and behavior. Thus, the aim of the current study was to explore the roles of action control and action planning as mediators between intentions and dietary behavior. A longitudinal study with three points in time was conducted. Participants (N = 286) were undergraduate students and invited to participate in a health behavior survey. At baseline (Time 1), measures of intention and fruit and vegetable intake were assessed. Two weeks later (Time 2), action control and action planning were assessed as putative sequential mediators. At Time 3 (two weeks after Time 2), fruit and vegetable consumption was measured as the outcome. The results revealed action control and action planning to sequentially mediate between intention and subsequent fruit and vegetable intake, controlling for baseline behavior. Both self-regulatory constructs, action control and action planning, make a difference when moving from motivation to action. Our preliminary evidence, therefore, suggests that planning may be more proximal to fruit and vegetable intake than action control. Further research, however, needs to be undertaken to substantiate this conclusion.

  8. Smart Buildings: Business Case and Action Plan

    SciTech Connect

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  9. 24 CFR 91.420 - Action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... to be undertaken to pursue its strategic plan. The consolidated plan must provide this description... each individual community that is a member of the consortium. (Approved by the Office of Management...

  10. Integrated planning for United Action in Phase Zero

    DTIC Science & Technology

    2007-05-24

    Integrated Planning for Unified Action in Phase Zero A Monograph by MAJ Elizabeth A. Medina US Army School of Advanced Military...Monograph 3. DATES COVERED (From - To) July 2006 – Feb 2007 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Integrated Planning for Unified Action in...of the Department of Defense to plan for Phase 0 at the strategic and operational levels. This paper will answer whether DoD has a method for

  11. K basins interim remedial action health and safety plan

    SciTech Connect

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  12. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    SciTech Connect

    Not Available

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

  13. National Action Plan for Energy Efficiency Report

    SciTech Connect

    National Action Plan for Energy Efficiency

    2006-07-01

    Summarizes recommendations, key barriers, and methods for energy efficiency in utility ratemaking as well as revenue requirements, resource planning processes, rate design, and program best practices.

  14. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action.

    PubMed

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations.

  15. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action

    PubMed Central

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations. PMID:27606968

  16. Nutrition Integrity in Action: Planning for Success.

    ERIC Educational Resources Information Center

    Stevenson, Peggy

    1994-01-01

    The Antioch Unified School District is one of several California schools testing a version of the Nutrient Standard Menu Planning (NSMP) to meet the new rules that require all schools to reduce the fat content of meals. NSMP, presently implemented at the elementary level, has increased flexibility in menu planning and led to better management and…

  17. Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada

    SciTech Connect

    Bechtel Nevada

    1998-08-31

    This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

  18. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... actions steps for reducing and ending homelessness through: (i) Reaching out to homeless persons... period of time that individuals and families experience homelessness, facilitating access for homeless... rent; mortgage and utility assistance payments to prevent homelessness of the individual or...

  19. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... permanent housing and independent living, specific action steps to end chronic homelessness, and to address... payments to prevent homelessness of the individual or family; tenant-based rental assistance; and...

  20. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... transition to permanent housing and independent living, specific action steps to end chronic homelessness... prevent homelessness of the individual or family; tenant-based rental assistance; and units provided...

  1. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... actions steps for reducing and ending homelessness through: (i) Reaching out to homeless persons... period of time that individuals and families experience homelessness, facilitating access for homeless... rent; mortgage and utility assistance payments to prevent homelessness of the individual or...

  2. USAF Affirmative Actions Plan. A Historical Perspective

    DTIC Science & Technology

    1984-04-01

    five target groups : Black, Hispanic, Other Racial Minority, Women, and Caucasian Male. This change provided a better analysis of affirmative actions for...Blacks and Other Racial Minorities and enabled a comparison between the minority target groups and the remainder of the Air Force population (i.e...Caucasian Male). Regarding this latter point, some field commanders contended that positive results in the affirmative action target groups were at the

  3. Stage II Remedial Action Plan Deer Lake AOC

    EPA Pesticide Factsheets

    Michigan Department of Environmental Quality reports on actions taken that have resulted in the removal of two beneficial use impairments. Outlines plans to remove remaining BUI and to delist the Area Of Concern.

  4. Controlling Asthma New Guidelines. New Medications. New Action Plans.

    MedlinePlus

    ... version of this page please turn Javascript on. New Guidelines. New Medications. New Action Plans. People everywhere and in every age ... I am putting the finishing touches on my new studio album that we hope to have out ...

  5. Learning through Participatory Action Research for Community Ecotourism Planning.

    ERIC Educational Resources Information Center

    Guevara, Jose Roberto Q.

    1996-01-01

    Ecologically sound tourism planning and policy require an empowering community participation. The participatory action research model helps a community gain understanding of its social reality, learn how to learn, initiate dialog, and discover new possibilities for addressing its situation. (SK)

  6. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    SciTech Connect

    Not Available

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date.

  7. Goal Reconstruction: How Teton Blends Situated Action and Planned Action

    DTIC Science & Technology

    1989-11-03

    5. Appendix: Teton 36 5.1. Knowledge representation 36 5.2. The execution cycle 37 5.3. Memories 39 Accssj-,n For NTIS 2A&I J, ’I, : t I .... J/J...Conclusions 35 5. Appendix: Teton 36 5.1. Knowledge representation 36 5.2. The execution cycle 37 5.3. Memories 39 When you purchase a programming language...inadequacies in current accounts of human working memory for goals. The third problem is that current accounts of problem solving overemphasize planning

  8. 36 CFR 906.5 - Administration of affirmative action plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding...) The developer shall report to the Corporation periodically its progress in meeting the goals and..., and committed opportunities. In meeting the reporting requirements the developer shall: (1) Count...

  9. The New Haven Department of Education Affirmative Action Plan 1974.

    ERIC Educational Resources Information Center

    New Haven Public Schools, CT.

    The New Haven public schools affirmative action report contains statements of purpose, policy, and responsibility in conjunction with a plan of action to ensure that job applicants and employees receive fair consideration without regard to their race, color, religion, sex, or national origin. The goals and timetables established will rectify…

  10. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  11. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 4 2011-07-01 2011-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  12. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 4 2014-07-01 2014-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  13. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 4 2012-07-01 2012-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  14. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  15. 29 CFR 1608.4 - Establishing affirmative action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Establishing affirmative action plans. 1608.4 Section 1608.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED §...

  16. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  17. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  18. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  19. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES... to mitigate adverse environmental impacts associated with the course of action directed by the...

  20. Climate Action Planning at the University of New Hampshire

    ERIC Educational Resources Information Center

    Cleaves, Sara M.; Pasinella, Brett; Andrews, Jennifer; Wake, Cameron

    2009-01-01

    Purpose: The purpose of this paper is to discuss the recent history of climate action planning at the University of New Hampshire (UNH), a public university with a long history of sustainability action and commitment. Items discussed include a partnership with Clean Air-Cool Planet (CA-CP) to produce a greenhouse gas (GHG) inventory tool that…

  1. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... employees to respond to an emergency that is beyond the scope of the Emergency Action Plan developed in... train a sufficient number of persons to assist in the safe and orderly emergency evacuation of employees...: (A) Initially when the plan is developed; (B) Whenever the employee's responsibilities or...

  2. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or... action plans. (a) Scope and application. This section requires all employers to develop and implement an... employees must take to ensure employee safety from fire and other emergencies. 14 When an employer...

  3. 24 Command Fire Improvement Action Program Plan

    SciTech Connect

    GRIFFIN, G.B.

    2000-12-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

  4. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... local FSS program, and shall contain, at a minimum, the following information: (1) Family demographics. A description of the number, size, characteristics, and other demographics (including racial and... outreach efforts, to recruit FSS participants from among eligible families; and (ii) The PHA's actions...

  5. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... local FSS program, and shall contain, at a minimum, the following information: (1) Family demographics. A description of the number, size, characteristics, and other demographics (including racial and... outreach efforts, to recruit FSS participants from among eligible families; and (ii) The PHA's actions...

  6. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... local FSS program, and shall contain, at a minimum, the following information: (1) Family demographics. A description of the number, size, characteristics, and other demographics (including racial and... outreach efforts, to recruit FSS participants from among eligible families; and (ii) The PHA's actions...

  7. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... local FSS program, and shall contain, at a minimum, the following information: (1) Family demographics. A description of the number, size, characteristics, and other demographics (including racial and... outreach efforts, to recruit FSS participants from among eligible families; and (ii) The PHA's actions...

  8. Student-Industry Plan for Action.

    ERIC Educational Resources Information Center

    National Association of Manufacturers, New York, NY. Education Committee.

    The guidelines for a student-industry action committee represent an attempt by the authors to reverse the trend of mistrust demonstrated by the American public toward business and industry. Twelve chapter presidents of Delta Sigma Pi, a university business fraternity, met initially with representatives of the National Association of Manufacturers…

  9. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... goals and specific actions steps for reducing and ending homelessness through: (i) Reaching out to... shortening the period of time that individuals and families experience homelessness, facilitating access for... payments to prevent homelessness of the individual or family; tenant-based rental assistance; and...

  10. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... actions steps for reducing and ending homelessness through: (i) Reaching out to homeless persons... period of time that individuals and families experience homelessness, facilitating access for homeless... homelessness of the individual or family; tenant-based rental assistance; and units provided in...

  11. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... goals and specific actions steps for reducing and ending homelessness through: (i) Reaching out to... shortening the period of time that individuals and families experience homelessness, facilitating access for... prevent homelessness of the individual or family; tenant-based rental assistance; and units provided...

  12. 24 CFR 91.220 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... goals and specific actions steps for reducing and ending homelessness through: (i) Reaching out to... shortening the period of time that individuals and families experience homelessness, facilitating access for... prevent homelessness of the individual or family; tenant-based rental assistance; and units provided...

  13. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Ambrosia Lake, New Mexico. Volume 1, Text, Appendices A, B, and C: Final report

    SciTech Connect

    Matthews, M.L.; Mitzelfelt, R.

    1991-11-01

    This Remedial Action Plan (RAP) has been developed to serve a dual purpose. It presents the series of activities that is proposed by the US Department of Energy (DOE) to stabilize and control radioactive materials at the inactive Phillips/United Nuclear uranium processing site designated as the Ambrosia Lake site in McKinley County, New Mexico. It also serves to document the concurrence of both State of New Mexico and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

  14. White House Climate Action Plan Hotly Debated in Senate Hearing

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2014-01-01

    Emotions ran high among senators at a 16 January U.S. Senate hearing on the White House's Climate Action Plan; the hearing included administration officials and other supporters of the plan as well as opponents. The plan, which President Barack Obama presented in June 2013 (see Eos, 94(27), 239, doi:10.1002/2013EO270003), calls for cutting carbon pollution, preparing the nation for the impacts of climate change, and leading international efforts to address climate change.

  15. Hawaii's Adolescent Wellness Plan: Laulima in Action.

    ERIC Educational Resources Information Center

    Hawaii State Dept. of Health, Honolulu.

    Based on a need in Hawaii for a multilevel responsibility and commitment to ensure adolescent wellness, the Hawaii Adolescent Wellness Team developed a plan based on research and discussions with a variety of professionals and community leaders in health, education, and social service. This resource handbook is designed to assist communities in…

  16. Action Planning in Young Children's Tool Use

    ERIC Educational Resources Information Center

    Cox, Ralf F. A.; Smitsman, Ad W.

    2006-01-01

    Tool use consists of at least two coupled phases of activities, involving multi-step problem solving. It therefore provides an interesting window on the development of planning in goal-directed behavior. This study investigated 2-year-olds' and 3-year-olds' hand use in picking up and subsequently using a tool for displacing a target-object towards…

  17. Monitoring the Curriculum: From Plan to Action.

    ERIC Educational Resources Information Center

    Maglaras, Tom; Lynch, Deborah

    1988-01-01

    The Aurora Public School System (Colorado) has devised a plan to ensure implementation of the adopted curriculum. By developing a program monitoring process and incorporating it in a handbook, staff can rate their behavior and use "green flags" or "red alerts" to characterize subject area strengths and deficiencies. (MLH)

  18. Building air quality: Action plan, June 1998

    SciTech Connect

    1998-11-01

    To promote the use of these straightforward practices to improve IAQ, EPA and other leaders in the IAQ field developed this 8-step plan. This additional resource meets the needs of building owners and managers who want an easy-to-understand path for taking their building from current conditions and practices to the successful institutionalization of good IAQ management practices.

  19. Action Planning: Rowing in the Same Direction

    ERIC Educational Resources Information Center

    Hewson, Kurtis; Adrian, Lorna

    2008-01-01

    Two years ago, as Claresholm Elementary School prepared for a new year with a new principal, it had the usual shopping list of ambitions--focus on student learning, support the staff, empower parents, and more. However, in examining the school's improvement plan it became apparent that the school staff had a unique opportunity to develop solid…

  20. McClellan AFB Management Action Plan (MAP) submittal

    SciTech Connect

    Not Available

    1992-12-23

    This Management Action Plan ('Action Plan' or 'MAP') contains a status summary of the McClellan Air Force Base (McAFB) environmental restoration and compliance programs and presents a comprehensive strategy for implementing response actions necessary to protect human health and the environment. This strategy integrates activities under both the Installation Restoration Program (IRP) and the Environmental Compliance Program (ECP). This Action Plan is a dynamic document that will be updated on a regular basis using the change-a-page looseleaf binder concept for day-to-day revisions along with a subsection at the end of each chapter to highlight any modifications or innovations since the previous major annual review/update.

  1. Rap Music and Choral Education.

    ERIC Educational Resources Information Center

    Bitz, Michael

    1998-01-01

    Suggests choral teachers use rap music to promote student interest and to teach music basics, such as rhythm, pitch, harmony, and timbre. Maintains that students can write the arrangements allowing them to gain experience in notating. Identifies selected recordings and offers an example of how to use rap music. (CMK)

  2. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Public Health Action Plan for the Detection, Prevention, and Management of Infertility AGENCY: Centers... Management of Infertility. The draft plan can be found at http://www.regulations.gov Docket No. CDC-2012-0004... for the Prevention, Detection, and Management of Infertility, which was subsequently developed...

  3. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report, attachment 2, geology report; attachment 3, groundwater hydrology report; and attachment 4, water resources protection strategy. Final report

    SciTech Connect

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  4. YBX1 is a modulator of MIA/CD-RAP-dependent chondrogenesis.

    PubMed

    Schmid, Rainer; Meyer, Katharina; Spang, Rainer; Schittek, Birgit; Bosserhoff, Anja Katrin

    2013-01-01

    MIA/CD-RAP is a small, secreted protein involved in cartilage differentiation and melanoma progression. We recently revealed that p54(nrb) acts as a mediator of MIA/CD-RAP action to promote chondrogenesis and the progression of malignant melanoma. As the molecular mechanism of MIA/CD-RAP action in cartilage has not been defined in detail until now, we aimed to understand the regulation of p54(nrb) transcription in chondrogenesis. We concentrated on the previously described MIA/CD-RAP-dependent regulatory region in the p54(nrb) promoter and characterized the transcriptional regulation of p54(nrb) by MIA/CD-RAP in cartilage. A series of truncated p54(nrb) promoter constructs and mutagenesis analysis revealed that the transcription factor YBX1, which has not been investigated in chondrogenesis thus far, is the mediator of MIA/CD-RAP dependent activation of p54(nrb) transcription. A systematic analysis of genes carrying this binding site in their promoter region revealed further potential MIA/CD-RAP-regulated genes that have been implicated in cartilage differentiation. In summary, we described the effects of MIA/CD-RAP on transcriptional regulation in chondrocytes. Understanding the regulation of p54(nrb) via YBX1 contributes to the understanding of chondrogenesis. Uncovering new downstream effectors that function via the activation of YBX1 supports the important role of MIA/CD-RAP in these processes.

  5. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...-year action plan). (a) Submission. As soon as possible after modernization funds first become available... components of the comprehensive plan. The meeting shall be open to all residents and duly elected resident... addition, the PHA shall identify the funds or other resources in the consolidated plan that are to be...

  6. Action plans can interact to hinder or facilitate reach performance.

    PubMed

    Fournier, Lisa R; Wiediger, Matthew D; Taddese, Ezana F

    2015-11-01

    Executing a reach action can be delayed while retaining another action in working memory (WM) if the two action plans partly overlap rather than do not overlap. This delay (partial repetition cost) occurs when reach responses are under cognitive control. In this study, we investigated whether facilitation (a partial repetition benefit) occurs when reach responses are automatic. We also examined whether the hemisphere controlling the limb or selection of the preferred limb (based on a free-reach task) influences reach performance when the actions partly overlap. Left- and right-handers reached to different stimulus locations to the left and right of body midline with their ipsilateral hand while maintaining an action plan in WM that required the same or the different hand. The results showed a partial repetition benefit for spatially compatible reaches to left and right stimulus locations far from the body midline, but not for those near the body midline. Also, no partial repetition cost was found at any of the stimulus-reach locations. This indicates that automatic reach responses that partly overlap with an action plan maintained in WM are not delayed, but instead can be facilitated (partial repetition benefit). The roles of hemisphere and reach-hand preference in action control and the importance of the degree of feature overlap in obtaining a partial repetition benefit (and cost) are discussed.

  7. Global tropospheric chemistry: A plan for action

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Prompted by an increasing awareness of the influence of human activity on the chemistry of the global troposphere, a panel was formed to (1) assess the requirement for a global study of the chemistry of the troposphere; (2) develop a scientific strategy for a comprehensive plan taking into account the existing and projected programs of the government; (3) assess the requirements of a global study in terms of theoretical knowledge, numerical modeling, instrumentation, observing platforms, ground-level observational techniques, and other related needs; and (4) outline the appropriate sequence and coordination required to achieve the most effective utilization of available resources. Part 1 presents a coordinated national blueprint for scientific investigations of biogeochemical cycles in the global troposphere. part 2 presents much of the background information of the present knowledge and gaps in the understanding of tropospheric chemical cycles and processes from which the proposed program was developed.

  8. Water supply planning under interdependence of actions: Theory and application

    NASA Astrophysics Data System (ADS)

    Rajabi, S.; Hipel, K. W.; Kilgour, D. M.

    1999-07-01

    An ongoing water supply planning problem in the Regional Municipality of Waterloo, Ontario, Canada, is studied to select the best water supply combination, within a multiple-objective framework, when actions are interdependent. The interdependencies in the problem are described and shown to be essential features. The problem is formulated as a multiple-criteria integer program with interdependent actions. Because of the large number of potential actions and the nonconvexity of the decision space, it is quite difficult to find nondominated subsets of actions. Instead, a modified goal programming technique is suggested to identify promising subsets. The appropriateness of this technique is explained, and the lessons learned in applying it to the Waterloo water supply planning problem are described.

  9. Preparing US community greenhouse gas inventories for climate action plans

    NASA Astrophysics Data System (ADS)

    Blackhurst, Michael; Matthews, H. Scott; Sharrard, Aurora L.; Hendrickson, Chris T.; Lima Azevedo, Inês

    2011-07-01

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  10. Looking at the formulation of national biosecurity education action plans.

    PubMed

    Sture, J; Minehata, M; Shinomiya, N

    2012-01-01

    In order for states to be assured of their compliance with the requirements of the Biological and Toxin Weapons Convention, it is necessary that all those science and policy stakeholders working within that state should be aware of their responsibilities under the Convention. This can only be achieved through a comprehensive national biosecurity education programme. We propose that each state should produce a national biosecurity action plan, with accompanying resources and materials to achieve this. A number of resources are already available online to support states in this challenge. We present a model for a national biosecurity action plan and propose a number of ways in which this may be achieved.

  11. Army Task Force on Behavioral Health: Corrective Action Plan

    DTIC Science & Technology

    2013-01-01

    will interface with the VA system and will be fully operational by 2017 . 5. MEDCOM is in the final stages of an OSC Concept Plan to be sent to DCS G-3...system testing at multiple sites, and the agencies must demonstrate significant single-site operations by 2014. Entire system field- ing is set for 2017 ...additional courses of action. The other courses of action included continuing the status quo with maxi - mum utilization of Reservists or partially

  12. 76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... QUALITY National Ocean Council; Strategic Action Plan Content Outlines AGENCY: Council on Environmental Quality. ACTION: Notice of Availability, Strategic Action Plan Content Outlines; Request for Comments... priority objectives. As a first step, Federal interagency writing teams have developed content outlines...

  13. Rap-Interacting Proteins are Key Players in the Rap Symphony Orchestra.

    PubMed

    Guo, Xiao-Xi; An, Su; Yang, Yang; Liu, Ying; Hao, Qian; Xu, Tian-Rui

    2016-01-01

    Rap, a member of the Ras-like small G-protein family, is a key node among G-protein coupled receptors (GPCR), receptor tyrosine kinases (RTKs), ion channels and many other downstream pathways. Rap plays a unique role in cell morphogenesis, adhesion, migration, exocytosis, proliferation, apoptosis and carcinogenesis. The complexity and diversity of Rap functions are tightly regulated by Rap-interacting proteins such as GEFs, GAPs, Rap effectors and scaffold proteins. These interacting proteins decide the subcellular localization of Rap, the interaction modes with downstream Rap effectors and tune Rap as an atypical molecular conductor, coupling extra- and intracellular signals to various pathways. In this review, we summarize four groups of Rap-interacting proteins, highlight their distinctions in Rap-binding properties and interactive modes and discuss their contribution to the spatiotemporal regulation of Rap as well as the implications of targeting Rap-interacting proteins in human cancer therapy.

  14. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... continuation of generation of electric power at the project during or following an accident or other incident... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY...

  15. State Action Plan for Iowa. "Marketing" Marketing Education.

    ERIC Educational Resources Information Center

    Omega Group, Inc., Haverford, PA.

    An Iowa project identified curriculum, program standards, and a framework for promoting marketing education programs. The mission for the state action plan for marketing education is to develop a strategy to revitalize Iowa's marketing education for the 21st century. Three goals support this mission: (1) create a community-wide awareness of the…

  16. Awarding Educational Credit for CETA Training: A Plan of Action.

    ERIC Educational Resources Information Center

    Sullins, W. Robert; And Others

    A project was conducted to determine problems or barriers prohibiting awarding credit for Comprehensive Employment and Training Act (CETA) training in Virginia. Potential solutions and strategies for their implementation were to be identified. A variety of methods were used to obtain information required to produce a Plan of Action that presents…

  17. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100...

  18. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100...

  19. Long-Chain Perfluorinated Chemicals (PFCs) Action Plan

    EPA Pesticide Factsheets

    This Action Plan is based on EPA’s initial review of readily available use, exposure, and hazard information on PFCs. EPA considered which of the various authorities provided under TSCA and other statutes might be appropriate to address potential concerns.

  20. 24 CFR 248.135 - Plans of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., including the identity of the transferee and a copy of any documents of sale; (5) An income profile of the... median income limits established by the Commissioner in February 1987), or if the January 1, 1987 profile... OF LOW INCOME HOUSING MORTGAGES Prepayments and Plans of Action Under the Low Income...

  1. Creating a Global Agenda: Assessments, Solutions, and Action Plans.

    ERIC Educational Resources Information Center

    Didsbury, Howard F., Jr., Ed.

    Designed for educational policymakers and researchers, this volume on global issues is divided into four sections. The four essays in the first section, "Reducing the Nuclear Peril," offer a brief documentary survey and then present practical suggestions and action plans to reduce the nuclear threat. The eight papers in the second…

  2. Noise action plan of agglomerations: sustainable hypothesis or utopy?

    PubMed

    Magri, S L; Masera, S; Fogola, J

    2009-12-01

    European and Italian laws establish that agglomerations of more than 100 000 inhabitants must adopt an action plan in order to manage noise issues and effects. The plan aim is to reduce population exposure to environmental noise, which is defined as the outdoor sound created by human activities, including noise emitted by road traffic, rail traffic and air traffic, and noise from sites of industrial activity. Although acoustic pollution represents one of the main causes of annoyance for inhabitants of urban areas, the political agenda does not acknowledge it among the main environmental issues. Thus, acoustic reclamation is often considered a duty to be accomplished rather than a way to improve quality of life for citizens. Furthermore, financial resources are generally very poor while the acoustic critical situations are numerous and serious in terms of exceeding the limit. In this situation, what is the meaning of an urban area noise action plan? What are the concrete actions that municipalities can realise to reduce urban noise pollution? This study tries to answer these questions, starting from the analysis carried out for the action plan of the city of Turin.

  3. 43 CFR 34.8 - Affirmative action plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... bid specifications in accordance with paragraph (b)(1) of this section. (2) Each contractor and... specifications for all bids for contracts in the amount of $50,000 or more, that all bidders which have, or would... action plan consistent with paragraphs (c) (1) and (2) of this section prior to bidding, unless...

  4. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex,...

  5. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex,...

  6. 14 CFR 152.409 - Affirmative action plan standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Affirmative action plan standards. 152.409 Section 152.409 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... selection rate for any race, sex, or ethnic group is less than 80 percent of the rate for the race, sex,...

  7. 24 CFR 248.213 - Plan of action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income... regulatory agreement, which may include a request for incentives to extend the low income use of the housing... proposed changes in the low income affordability restrictions; (4) A description of any proposed changes...

  8. National Action Plan for the Prevention of Playground Injuries.

    ERIC Educational Resources Information Center

    Thompson, Donna; Hudson, Susan

    Recognizing the need for a nationally coordinated effort to reduce playground injuries, the National Program for Playground Safety was created in 1995. This booklet describes the national action plan for prevention of playground injuries. Designed for use by parents, teachers, recreation and park personnel, and caregivers involved in providing…

  9. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  10. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  11. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  12. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  13. Action Plan for the Development of Civic Morality

    ERIC Educational Resources Information Center

    Chinese Education and Society, 2006

    2006-01-01

    This paper discusses the action plan for the development of civic morality. Here, the importance, substance, ideology and policy principles guiding the development of civic morality is elaborated. In order to strengthen the development of civic morality, it is a must to adapt to the requirements of the developing situation; seize good…

  14. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... additional information or to develop and submit a corrective action plan for responding to contaminated soils... responding to contaminated soil and ground water. In either case, owners and operators are responsible for... residual contamination on nearby surface water and ground water; (5) An exposure assessment; and (6)...

  15. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency... route assignments; (ii) Procedures to be followed by employees who remain to operate critical plant... area. (4) Evacuation. The employer shall establish the types of evacuation to be used in...

  16. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency... route assignments; (ii) Procedures to be followed by employees who remain to operate critical plant... area. (4) Evacuation. The employer shall establish the types of evacuation to be used in...

  17. A national action plan for workforce development in behavioral health.

    PubMed

    Hoge, Michael A; Morris, John A; Stuart, Gail W; Huey, Leighton Y; Bergeson, Sue; Flaherty, Michael T; Morgan, Oscar; Peterson, Janice; Daniels, Allen S; Paris, Manuel; Madenwald, Kappy

    2009-07-01

    Across all sectors of the behavioral health field there has been growing concern about a workforce crisis. Difficulties encompass the recruitment and retention of staff and the delivery of accessible and effective training in both initial, preservice training and continuing education settings. Concern about the crisis led to a multiphased, cross-sector collaboration known as the Annapolis Coalition on the Behavioral Health Workforce. With support from the Substance Abuse and Mental Health Services Administration, this public-private partnership crafted An Action Plan for Behavioral Health Workforce Development. Created with input from a dozen expert panels, the action plan outlines seven core strategic goals that are relevant to all sectors of the behavioral health field: expand the role of consumers and their families in the workforce, expand the role of communities in promoting behavioral health and wellness, use systematic recruitment and retention strategies, improve training and education, foster leadership development, enhance infrastructure to support workforce development, and implement a national research and evaluation agenda. Detailed implementation tables identify the action steps for diverse groups and organizations to take in order to achieve these goals. The action plan serves as a call to action and is being used to guide workforce initiatives across the nation.

  18. Team Planning to CLEAR Up Problems

    ERIC Educational Resources Information Center

    Koehler, Nancy

    2006-01-01

    Professionals and parents need effective systems of teamwork for planning restorative outcomes with troubled children and youth. This article taps the resilient problem-solving process C*L*E*A*R, which is drawn from the Response Ability Pathways (RAP) curriculum. Participants examine the timeline of Challenges, Logic, Emotions, Actions, and…

  19. Evaluation criteria for communications-related corrective action plans

    SciTech Connect

    1997-02-01

    This document provides guidance and criteria for US Nuclear Regulatory Commission (NRC) personnel to use in evaluating corrective action plans for nuclear power plant communications. The document begins by describing the purpose, scope, and applicability of the evaluation criteria. Next, it presents background information concerning the communication process, root causes of communication errors, and development and implementation of corrective actions. The document then defines specific criteria for evaluating the effectiveness of the corrective action plan, interview protocols, and an observation protocol related to communication processes. This document is intended only as guidance. It is not intended to have the effect of a regulation, and it does not establish any binding requirements or interpretations of NRC regulations.

  20. 29 CFR Appendix to Subpart E of... - Exit Routes, Emergency Action Plans, and Fire Prevention Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 5 2011-07-01 2011-07-01 false Exit Routes, Emergency Action Plans, and Fire Prevention..., and Fire Prevention Plans This appendix serves as a nonmandatory guideline to assist employers in.... Fire prevention housekeeping. The standard calls for the control of accumulations of flammable...

  1. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 536: AREA 3 RELEASE SITE, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2005-09-01

    CAU 536 consists of CAS 03-44-02, Steam Jenny Discharge, located in Area 3 of the NTS. The site was characterized in 2004 according to the approved CAIP and the site characterization results are reported in the CAU 536 CADD. The purpose of this Corrective Action Plan (CAP) is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 536 CADD.

  2. Observing end-state comfort favorable actions does not modulate action plan recall.

    PubMed

    Seegelke, Christian

    2015-01-01

    A large corpus of work demonstrates that observing other people's actions activates corresponding motor representations in the observer by running an internal simulation of the observed action. Recent evidence suggests that recalled action plans reflect a plan of how the observer would execute that action (based on the specific motor representation) rather than a plan of the actually observed action (based on the visual representation). This study examined whether people would recall an action plan based on a visual representation if the observed movement is biomechanically favorable for their own subsequent action. Participants performed an object manipulation task alongside a confederate. In the intra-individual task, the participant (or confederate) transported a plunger from an outer platform of fixed height to a center target platform located at different heights (home-to-target move), and then the same person transported the plunger back to the outer platform (target-back-to-home move). In the inter-individual task, the sequence was split between the two persons such that the participant (or confederate) performed the home-to-target move and the other person performed the target-back-to-home move. Importantly, the confederate always grasped the plunger at the same height. This grasp height was designated such that if participants would copy the action (i.e., grasp the object at the same height) it would place the participant's arm in a comfortable position at the end of the target-back-to-home move (i.e., end-state comfort). Results show that participants' grasp height was inversely related to center target height and similar regardless of direction (home-to-target vs. target-back-to-home move) and task (intra- vs. inter-individual). In addition, during the inter-individual task, participant's target-back-to-home grasp height was correlated with their own, but not with the confederate's grasp height during the home-to-target moves. These findings provide

  3. Observing end-state comfort favorable actions does not modulate action plan recall

    PubMed Central

    Seegelke, Christian

    2015-01-01

    A large corpus of work demonstrates that observing other people’s actions activates corresponding motor representations in the observer by running an internal simulation of the observed action. Recent evidence suggests that recalled action plans reflect a plan of how the observer would execute that action (based on the specific motor representation) rather than a plan of the actually observed action (based on the visual representation). This study examined whether people would recall an action plan based on a visual representation if the observed movement is biomechanically favorable for their own subsequent action. Participants performed an object manipulation task alongside a confederate. In the intra-individual task, the participant (or confederate) transported a plunger from an outer platform of fixed height to a center target platform located at different heights (home-to-target move), and then the same person transported the plunger back to the outer platform (target-back-to-home move). In the inter-individual task, the sequence was split between the two persons such that the participant (or confederate) performed the home-to-target move and the other person performed the target-back-to-home move. Importantly, the confederate always grasped the plunger at the same height. This grasp height was designated such that if participants would copy the action (i.e., grasp the object at the same height) it would place the participant’s arm in a comfortable position at the end of the target-back-to-home move (i.e., end-state comfort). Results show that participants’ grasp height was inversely related to center target height and similar regardless of direction (home-to-target vs. target-back-to-home move) and task (intra- vs. inter-individual). In addition, during the inter-individual task, participant’s target-back-to-home grasp height was correlated with their own, but not with the confederate’s grasp height during the home-to-target moves. These findings

  4. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    SciTech Connect

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action.

  5. Teaching Literacy as Rap at Southeast Community College.

    ERIC Educational Resources Information Center

    Sundeen, Jim

    2003-01-01

    Describes how the author became critically aware of the dynamics of literacy and race in a composition classroom. Introduces his students to rap music as a legitimate literacy and a type of literature in its own right. Describes the lesson plan he used in the project and explains some of the theory that inspired his classroom inquiry. (SG)

  6. The Newcastle (Australia) Airshed Management Action Plan (NAMAP)

    SciTech Connect

    Bridgman, H.A.; Cameron, C.

    1999-07-01

    The Newcastle (NSW Australia) Airshed Management Action Plan (NAMAP) has recently been completed, and is a forerunner toward urban air pollution management in Australia. NAMAP was developed by the Newcastle City Council in partnership with the community, science, and industry, as part of Council's commitments in it's environmental plan. Its purpose is to provide action strategies which will lead to improvements in Newcastle's air quality for future generations. Key issues addressed in the plan include: minimizing industrial emissions; reducing growth of vehicle kilometers traveled; improving energy efficiency; managing air quality from small and medium enterprises; reducing the impacts of solid fuel burning; improving management from councils own activities; making motor vehicle run clean; reviewing performance; and developing better solutions. Management strategies include community education, land use planning, regulation, economic incentives, monitoring, performance indicators and reporting. This paper describes the structure and development of NAMAP through stages from understanding the air pollution problem to recommending of action strategies for reduction and control. The development and implementation of NAMAP is particularly important as major changes in Newcastle's heavy industrial base will occur in the future, creating a restructuring in the relative importance of sources and primary emissions. NAMAP provides an excellent example of a cooperative effort to minimize air pollution problems in a small city.

  7. Affirmative Action Plans, January 1, 1994--December 31, 1994. Revision

    SciTech Connect

    Not Available

    1994-02-16

    This document is the Affirmative Action Plan for January 1, 1994 through December 31, 1994 for the Lawrence Berkeley Laboratory, University of California (``LBL`` or ``the Laboratory.``) This is an official document that will be presented upon request to the Office of Federal Contract Compliance Programs, US Department of Labor. The plan is prepared in accordance with the Executive Order 11246 and 41 CFR Section 60-1 et seq. covering equal employment opportunity and will be updated during the year, if appropriate. Analyses included in this volume as required by government regulations are based on statistical comparisons. All statistical comparisons involve the use of geographic areas and various sources of statistics. The geographic areas and sources of statistics used here are in compliance with the government regulations, as interpreted. The use of any geographic area or statistic does not indicate agreement that the geographic area is the most appropriate or that the statistic is the most relevant. The use of such geographic areas and statistics is intended to have no significance outside the context of this Affirmative Action Plan, although, of course, such statistics and geographic areas will be used in good faith with respect to this Affirmative Action Plan.

  8. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  9. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  10. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  11. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  12. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  13. Buried Waste Integrated Demonstration commercialization actions plans. Volume 1

    SciTech Connect

    Kaupanger, R.M.; Glore, D.

    1994-04-01

    The Buried Waste Integrated Demonstration (BWID) is sponsored by US Department of Energy (DOE) Office of Technology Development. BWID supports the development and demonstration of a suite of technologies that when integrated with commercially available baseline technologies form a comprehensive system for the effective and efficient remediation of buried waste throughout the DOE complex. BWID evaluates, validates, and demonstrates technologies and transfers this information throughout DOE and private industry to support DOE. remediation planning and implementation activities. This report documents commercialization action plans for five technologies with near-term commercialization/ implementation potential as well as provides a status of commercial and academic partners for each technology.

  14. Commonwealth of the Northern Mariana Islands Energy Action Plan

    SciTech Connect

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  15. On the importance of being first: serial order effects in the interaction between action plans and ongoing actions.

    PubMed

    Fournier, Lisa R; Gallimore, Jonathan M; Feiszli, Kevin R; Logan, Gordon D

    2014-02-01

    When we plan sequences of actions, we must hold some elements of the sequence in working memory (WM) while we execute others. Research shows that execution of an action can be delayed if it partly overlaps (vs. does not overlap) with another action plan maintained in WM (partial repetition cost). However, it is not known whether all features of the action maintained in WM interfere equally with current actions. Most serial models of memory and action assume that interference will be equal, because all action features in the sequence should be activated to an equal degree in parallel; others assume that action features earlier in the sequence will interfere more than those later in the sequence, because earlier features will be more active. Using a partial repetition paradigm, this study examined whether serial position of action features in action sequences maintained in WM have an influence on current actions. Two stimulus events occurred in a sequence, and participants planned and maintained an action sequence to the first event (action A) in WM while executing a speeded response to the second event (action B). Results showed delayed execution of action B when it matched the first feature in the action A sequence (partial repetition cost), but not when it matched the last feature. These findings suggest that serial order is represented in the action plan prior to response execution, consistent with models that assume that serial order is represented by a primacy gradient of parallel feature activation prior to action execution.

  16. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    USGS Publications Warehouse

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  17. Implement balanced scorecard to translate strategic plan into actionable objectives.

    PubMed

    2004-09-01

    Faced with challenges ranging from declining reimbursement to staff shortages, health care organizations--integrated delivery systems, physician group practices, disease management providers, and others--increasingly are turning to general business models to map out step-by-step action plans for performance measurement and process improvement. Creating a "balanced scorecard" is an obvious starting point for assessing and improving clinical and financial performance.

  18. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  19. The National Action Plan. Australian School Science Education National Action Plan, 2008-2012. Volume 1

    ERIC Educational Resources Information Center

    Goodrum, Denis; Rennie, Leonie J.

    2007-01-01

    In 2001, the Australian Government released a report, commissioned by the then Department of Education, Training and Youth Affairs, entitled "The Status and Quality of Teaching and Learning of Science in Australian Schools" (Goodrum, Hackling, & Rennie, 2001). Its recommendations included actions to address raising community…

  20. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Text, Appendices A--C. Final report

    SciTech Connect

    1988-07-01

    This Remedial Action Plan (RAP) has been developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Appendices A,B, and C are provided as part of this document. Appendix A presents regulatory compliance issues, Appendix B provides details of the engineering design, and Appendix C presents the radiological support plan.

  1. Functional exercise of Kingsley Dam emergency action plan

    SciTech Connect

    Boyd, K.M.

    1995-12-31

    At the request of the Federal Energy Regulatory Commission (F.E.R.C.), the Central Nebraska Public Power and Irrigation District (Central) performed a Functional Test of the Kingsley Dam Emergency Action Plan (E.A.P.) on October 27, 1992. The purpose of the exercise was to evaluate the Emergency Action Plan under a stress-induced environment with time constraints that exercised skills which are required for emergency management. This exercise was unique as it took place simultaneously at three different sites: North Platte Holiday Inn, Lincoln County Civil Defense Headquarters and the Keith County Civil Defense Office. Fifty miles separated the two Civil Defense Headquarters. There was a mobile command post that allowed radio communications between the different Civil Defenses offices. During the exercise, both levels of the E.A.P. (hazardous situation developing and failure has occurred) were tested. Both Keith and Lincoln County Civil Defense offices were able to test their own preparedness plans and communications. Besides the successful tests of the plans, a cooperative spirit was strengthened among the agencies as well as an exchange of knowledge and resources.

  2. Site action plan for maintenance management program. Revision D

    SciTech Connect

    Pearson, A.W.

    1993-11-30

    (DOE) Order 4330.4B, ``Maintenance Management Program`` requires each site to develop a Site Action Plan for implementing a Maintenance Management Program. Nonnuclear facilities are required to address the 32 elements of Chapter 1: Guidelines for the Conduct of Maintenance at DOE Nonnuclear Facilities. This document details the degree of implementation for each element, and the Martin Marietta Specialty Components, Inc., plan for implementation of the items which remain to be completed. The original Pinellas Plant Maintenance Management Program Site Action Plan (Issue A) was completed March 27, 1991. The format was modified per DOE request and it was resubmitted as Issue B and approved by AL September 16, 1991. Issue C was submitted, and approved December 20, 1992. The most significant achievement during FY-93 were the implementation of plant wide Graded Approach, and Configuration Control programs. The methodologies for performing these activities were developed, and pilot programs were implemented to verify their effectiveness. Plant wide implementation of both programs is progressing on a high priority basis. The formalized method for grading equipment and facilities provides a basis for establishing uniform, risk based priorities. The risks involved are environment, safety, health and programmatic mission. Other achievements for FY-93, include the establishment of procedures for the decommissioning, and down-grading of facilities, improved work control, improved work performance reporting, improved quality plans, and improved operating procedures.

  3. Information architecture: Standards adoption and retirement process service action plan

    SciTech Connect

    1997-03-01

    The purpose of this Service Action Plan is to announce, as well as provide, a high-level outline of a new Departmental process for the adoption and retirement of information technology standards. This process supports the implementation of a Department of Energy (DOE) Information Architecture. This plan was prepared with the Department of Energy information technology standards customers and stakeholders in mind. The process described in this plan will be serviced primarily by staff from the Office of the Deputy Assistant Secretary for Information Management with assistance from designated program and site Information Technology Standards Points of Contact. We welcome any comments regarding this new Departmental process and encourage the proposal of information technology standards for adoption or retirement.

  4. Record of Technical Change - Corrective Action Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office; Bechtel Nevada

    2005-04-13

    Record of Technical Change, Technical Change No. CAP-1, dated April 13, 2005 for Corrective Action Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Revision 0, September 2004, DOE/NV--1003.

  5. Modification to the Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Volume 1, Text, Attachments 1--6. Final report

    SciTech Connect

    1989-01-01

    This document provides the modifications to the 1988 Remedial Action Plan (RAP) of the contaminated materials at the Monument Valley, Arizona, and Mexican Hat, Utah. The text detailing the modifications and attachments 1 through 6 are provided with this document. The RAP was developed to serve a two-fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents.

  6. Optimal expression condition of recombinant RAP.

    PubMed

    Zhang, Jie; Zhang, Hong; Bi, Hao; Liu, Zhiguo; Guo, Jianli; Qu, Shen

    2007-02-01

    In order to construct the expression recombinant of human receptor associated protein (RAP), optimize its expression condition and obtain the recombinant protein after expression with high efficiency, two prokaryotic expression vectors-pT7-PL and pET-28a(+) were used to construct the expression recombinant containing RAP cDNA, and the expression efficiency of two kinds of expression E. coli of BL21 strains was compared. The effect of different induction conditions on the expression of recombinant RAP was observed. After recombinant protein was purified with Ni(+) -nitrilotriacetic acid (Ni(+) -NTA) affinity chromatogram, its binding ability with microphage was observed. The results showed that two recombinant plasmids both obtained high expression of RAP. The expression levels of RAP in plasmid pT7-PL-RAP in BL21 (DE3, plysS) strain were significantly higher than in BL21 (DE3) strain. The expression of pT7-PL-RAP in the presence of chloramphenicol was higher than in the absence of chloramphenicol, and most of the inducible expressed RAP was soluble. The RAP which was purified by Ni(+) -NTA resin could strongly bind with the RAW264.7 cells rich in low density lipoprotein receptor (LDLR) family receptors. It was concluded that the expression condition of recombinant RAP was optimized and functional RAP was obtained, which offered a good foundation for the further production of RAP as research tool.

  7. German Rap Music in the Classroom.

    ERIC Educational Resources Information Center

    Schmidt, Johannes

    2003-01-01

    Provides background information on German rap artists and bands and discusses how to implement the music in various classroom situations at all levels. Highlights some of the available material on German rap music and provides information on how to locate rap texts, information, and other material via the Internet and other sources. (Author/VWL)

  8. Action Plan for updated Chapter 15 Accident Analysis in the SRS Production Reactor SAR

    SciTech Connect

    Hightower, N.T. III; Burnett, T.W.

    1989-11-15

    This report describes the Action Plan for the upgrade of the Chapter 15 Accident Analysis in the SRS Production Reactor SAR required for K-Restart. This Action Plan will be updated periodically to reflect task accomplishments and issue resolutions.

  9. Workshop on the preparation of climate change action plans. Workshop summary

    SciTech Connect

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  10. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    SciTech Connect

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the Corrective Action Unit No. 426, which includes the Cactus Spring Waste Trenches, located at the Tonopah Test Range. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action. The scope of this investigation will include drilling and collecting subsurface samples from within and below the trenches. Sampling locations will be biased toward the areas most likely to be contaminated. The Cactus Spring Waste Trenches Site is identified as one of three potential locations for buried, radioactively contaminated materials from the Double Tracks Test. This test was the first of four storage-transportation tests conducted in 1963 as part of Operation Roller Coaster. The experiment involved the use of live animals to assess the inhalation intake of a plutonium aerosol.

  11. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation

  12. Planning perception and action for cognitive mobile manipulators

    NASA Astrophysics Data System (ADS)

    Gaschler, Andre; Nogina, Svetlana; Petrick, Ronald P. A.; Knoll, Alois

    2013-12-01

    We present a general approach to perception and manipulation planning for cognitive mobile manipulators. Rather than hard-coding single purpose robot applications, a robot should be able to reason about its basic skills in order to solve complex problems autonomously. Humans intuitively solve tasks in real-world scenarios by breaking down abstract problems into smaller sub-tasks and use heuristics based on their previous experience. We apply a similar idea for planning perception and manipulation to cognitive mobile robots. Our approach is based on contingent planning and run-time sensing, integrated in our knowledge of volumes" planning framework, called KVP. Using the general-purpose PKS planner, we model information-gathering actions at plan time that have multiple possible outcomes at run time. As a result, perception and sensing arise as necessary preconditions for manipulation, rather than being hard-coded as tasks themselves. We demonstrate the e ectiveness of our approach on two scenarios covering visual and force sensing on a real mobile manipulator.

  13. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  14. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    SciTech Connect

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  15. Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children

    ERIC Educational Resources Information Center

    Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert

    2013-01-01

    The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…

  16. Evaluating the Impact of Action Plans on Trainee Compliance with Learning Objectives

    ERIC Educational Resources Information Center

    Aumann, Michael J.

    2013-01-01

    This mixed methods research study evaluated the use of technology-based action plans as a way to help improve compliance with the learning objectives of an online training event. It explored how the action planning strategy impacted subjects in a treatment group and compared them to subjects in a control group who did not get the action plan. The…

  17. Report of the Tape Recorder Action Plan Committee, 21 March 1972

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A NASA/AF Tape Recorder Action Plan Committee was formed in January 1972 to investigate tape recorder problems and to recommend an action plan to NASA management. The committee collected data on tape recorder failure history, pinpointed problem areas, discussed needed technical and management changes, and proposed an action plan for the recommended approaches.

  18. Practice in Planning and Planning in Practice: Re-Assessing and Clarifying Action Research in a Multi-National Context

    ERIC Educational Resources Information Center

    Kusch, Jim; Rebolledo, Geisha; Ryan, Charly

    2005-01-01

    This paper responds to a call seeking presenters for an action-research event for elementary-school science teachers in Venezuela. The authors planned on the assumption that the participants would wish to leave with plans for introducing action-research approaches into their practice. In previous writing on action research, the various protocols…

  19. [Applicability of Children's Environment and Health Action Plan in Serbia].

    PubMed

    Ilić, Miroslava Kristoforović

    2010-01-01

    The Children's Environment and Health Action Plan for Europe was adopted at the 4th Ministry Conference on Environment (the World Health Organization, 2004). It is focused on children health care against hazards originating from the human environment. In its conclusion, the need is expressed for the development of national plans in the field of Environmental and Children Health for European region by 2007. Mutual activities would be obligatory for each country and their realization should be the responsibility of Ministers of Health Care and Environmental Health. In our country, a draft version of this document was recently adopted, where the following priority regional goals are proposed: safe drinking water and adequate sanitation, injury prevention and adequate physical activity, clean indoor and outdoor air, the human environment without chemicals. Every segment has been explained in details through activities, expected results, indicators, sources of verification and the main participants in the project implementation. The end of the action plan period is proposed to be the year 2019. It is also followed by a defined set of indicators: exposure, activities and health status. The analyses of particular activities or data to be used have pointed to some drawbacks of this draft version, which can be overcome by respecting expert opinions.

  20. Corrective Action Plan for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada

    SciTech Connect

    Bechtel Nevada

    1998-09-30

    This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that the landfill cells were used for solid waste disposal, including disposal of UXO.

  1. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within...

  2. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within...

  3. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within...

  4. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within...

  5. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within...

  6. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    ERIC Educational Resources Information Center

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  7. 75 FR 60759 - Enforcement Action Plan for Promotion and Advertising Restrictions; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... HUMAN SERVICES Food and Drug Administration Enforcement Action Plan for Promotion and Advertising... Plan for Promotion and Advertising Restrictions'' (Enforcement Action Plan), which describes FDA's plan to enforce the restrictions on promotion and advertising of menthol and other cigarettes to youth...

  8. The Representation of Action Plans in Long Term Memory

    NASA Technical Reports Server (NTRS)

    Fussfeld, G. N.; Koenig, W.; Karis, D.

    1984-01-01

    A sequence of experiments conducted on a two hand chord typewriter, to compare the efficiency of different coding principles employed to associate letters with their chord productions is described. This keyboard represents an effort to identify effective alternatives to the existing typewriter. It consists of two seperate 5-key panels (one for each hand), and letters are entered by typing chords composed of one to five fingers. Each panel is capable of producing the full alphabet. One group of experiments was designed to separate between perceptual and motor factors in the acivation of single letter chords. The results underline the importance of perceptual factors in the activation of motor plans. The complexity of the patterns employed to represent letters was shown to account for 50 percent of variance in the typing speeds of single letters. The theoretical implications of these results are discussed in relation to a vision based theory of action plans.

  9. [Strategic planning: an important economic action for German hospitals].

    PubMed

    Wiese, Christoph H R; Zink, Wolfgang; Russo, Sebastian G

    2011-11-01

    In medical systems, economic issues and means of action are in the course of dwindling human (physicians and nurses) and financial resources are more important. For this reason, physicians must understand basic economic principles. Only in this way, there may be medical autonomy from social systems and hospital administrators. The current work is an approach to present a model for strategic planning of an anesthesia department. For this, a "strengths", "weaknesses", "opportunities", and "threats" (SWOT) analysis is used. This display is an example of an exemplary anaesthetic department.

  10. The scaup conservation action plan: working toward coherence

    USGS Publications Warehouse

    Austin, Jane E.

    2010-01-01

    The last in a series of three workshops to develop a decision framework for the scaup conservation action plan was conducted in September 2009. Fifteen waterfowl biologists and managers met in Memphis, Tennessee at the Ducks Unlimited Headquarters to review and refine the decision statement, objectives, and prototype model for the continental scaup population, with a special focus on vital rate parameters that are affected during migration and winter. In a significant step toward coherence, the participants also developed models for incorporating human dimensions – hunters – into the decision framework, and to link the population of diving duck hunters with the continental scaup population.

  11. Impact of action planning on spatial perception: attention matters.

    PubMed

    Kirsch, Wladimir

    2015-03-01

    Previous research suggested that perception of spatial location is biased towards spatial goals of planned hand movements. In the present study I show that an analogous perceptual distortion can be observed if attention is paid to a spatial location in the absence of planning a hand movement. Participants judged the position of a target during preparation of a mouse movement, the end point of which could deviate from the target by a varying degree in Exp. 1. Judgments of target position were systematically affected by movement characteristics consistent with perceptual assimilation between the target and the planned movement goal. This effect was neither due to an impact of motor execution on judgments (Exp. 2) nor due to characteristics of the movement cues or of certain target positions (Exp. 3, Exp. 5A). When the task included deployment of attention to spatial positions (former movement goals) in preparation for a secondary perceptual task, an effect emerged that was comparable with the bias associated with movement planning (Exp. 4, Exp. 5B). These results indicate that visual distortions accompanying manipulations of variables related to action could be mediated by attentional mechanisms.

  12. Can persuasive messages encourage individuals to create action plans for physical activity?

    PubMed

    Sweet, Shane N; Brawley, Lawrence R; Hatchell, Alexandra; Gainforth, Heather L; Latimer-Cheung, Amy E

    2014-08-01

    Given the positive influence of action planning on physical activity, persuasive messages could be designed to promote action planning. The purpose of this paper was to test action planning messages in two studies. Participants were allocated to one of two message groups, reading either a physical activity only or physical activity plus action planning message (Study 1) and either a gain-framed or loss-framed action planning message (Study 2). The percent of individuals who created an action plan and the quality of the plans were evaluated. In Study 1, individuals in the physical activity plus action planning group created as many action plans as the physical activity only group, but their plans were higher quality. In Study 2, Week 2 differences between the gain- and loss-framed message groups were found for action planning. To our knowledge, these studies were the first to investigate message-induced action planning as a behavior. More research is needed to optimize these messages.

  13. Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    SciTech Connect

    T. M. Fitzmaurice

    2000-05-01

    This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

  14. An action plan for tobacco control at regional level.

    PubMed

    Edwards, R; Brown, J S; Hodgson, P; Kyle, D; Reed, D; Wallace, B

    1999-07-01

    Smoking is the single biggest preventable cause of death in the UK; killing over 120 000 people each year, contributing to inequalities in health, exacerbating and causing poverty. Smoking has increased steadily among children since 1988 and more recently, among young adults. The current context in the UK is highly favourable for introducing comprehensive tobacco control measures. This paper summarises a regional action plan for tobacco control. Actions at district and regional levels are outlined to establish a comprehensive local tobacco control framework and complement national tobacco control measures. Measures include: a 'SWOT' analysis of current activity; systematic monitoring of smoking prevalence, attitudes to smoking, and the impact of tobacco control interventions; provision of effective smoking cessation support to a minimum standard throughout the health service; increased coverage of smoke-free public places and workplaces; enforcement of legislation on illegal sales to children and against smuggling and selling illegally imported tobacco; paid and unpaid mass media campaigns; and systematic lobbying for fiscal and legislative measures. One of the key components of the plan is the introduction of evidence-based tobacco control strategies at district levels. These should include a performance framework with clear organisational and managerial accountability and employ a co-ordinated, multiagency, partnership approach. Priority groups should be identified. Strategies should seek to engage the public to build support for tobacco control measures. Sufficient time, staff, resources and training must be allocated to tobacco control work and progress towards objectives monitored.

  15. Action, perception and postural planning when reaching for tools.

    PubMed

    Sunderland, Alan

    2013-06-01

    The dorsal and ventral streams model of action and perception suggests that reaching to grasp a tool for use involves integrated operation of the two streams. Few attempts have been made to test the limits of this integration in normal subjects. Twenty normal subjects reached for tools or geometric objects which were rotated rapidly during reaching or immediately beforehand. In a first experiment it was shown that reaching for an inverted tool was slower than reaching for objects which required hand inversion due to proximity to a physical barrier. Also, for the right hand, tool rotation during reaching provoked a higher incidence of hand rotation in the wrong direction than did rotation of objects. In a second similar experiment, hand inversion when grasping objects was induced by the need to plan a future action rather than by proximity of a physical barrier. Despite this balancing of complexity of postural planning for tools and objects, hand rotation errors for both hands were more common for tools than objects. This was consistent with the two-stream model in suggesting that there was a process which produced rapid online tracking of stimulus rotation and this had to be overcome by a slower process which dictated grasping in accordance with knowledge of tool use.

  16. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  17. Histone deacetylase inhibitors upregulate Rap1GAP and inhibit Rap activity in thyroid tumor cells.

    PubMed

    Dong, Xiaoyun; Korch, Christopher; Meinkoth, Judy L

    2011-06-01

    Increases in Rap activity have been associated with tumor progression. Although activating mutations in Rap have not been described, downregulation of Rap1GAP is frequent in human tumors including thyroid carcinomas. In this study, we explored whether endogenous Rap1GAP expression could be restored to thyroid tumor cells. The effects of deacetylase inhibitors and a demethylating agent, individually and in combination, were examined in four differentiated and six anaplastic thyroid carcinoma (ATC) cell lines. Treatment with the structurally distinct histone deacetylase (HDAC) inhibitors, sodium butyrate and trichostatin A, increased Rap1GAP expression in all the differentiated thyroid carcinoma cell lines and in four of the six ATC cell lines. The demethylating agent, 5-aza-deoxycytidine, restored Rap1GAP expression in one anaplastic cell line and enhanced the effects of HDAC inhibitors in a second anaplastic cell line. Western blotting indicated that Rap2 was highly expressed in human thyroid cancer cells. Importantly, treatment with HDAC inhibitors impaired Rap2 activity in both differentiated and anaplastic tumor cell lines. The mechanism through which Rap activity is repressed appears to entail effects on the expression of multiple Rap regulators, including RapGEFs and RapGAPs. These results suggest that HDAC inhibitors may provide a tractable approach to impair Rap activity in human tumor cells.

  18. Rap Music: An Education with a Beat from the Street.

    ERIC Educational Resources Information Center

    Powell, Catherine Tabb

    1991-01-01

    Examines rap music's origins as street music and poetry in the early 1970s and as an expression of Black youth experience. Discusses rap groups, women and Whites in rap, Christian rap, copyright disputes, and distribution difficulties. Rap is an informal educational medium that affects adolescents' values and attitudes. (JB)

  19. Rap-Music Attitude and Perception Scale: A Validation Study

    ERIC Educational Resources Information Center

    Tyson, Edgar H.

    2006-01-01

    Objective: This study tests the validity of the Rap-music Attitude and Perception (RAP) Scale, a 1-page, 24-item measure of a person's thoughts and feelings surrounding the effects and content of rap music. The RAP was designed as a rapid assessment instrument for youth programs and practitioners using rap music and hip hop culture in their work…

  20. Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site

    SciTech Connect

    DOE /NV

    1998-11-01

    This Corrective Action Investigation Plan (CAIP) describes the US Department of Energy's (DOE's) continued environmental investigation of the subsurface Project Shoal Area (PSA) Corrective Action Unit (CAU) 447. The PSA is located in the Sand Springs Mountains in Churchill County, Nevada, about 48 kilometers (km) (30 miles [mi]) southeast of Fallon, Nevada. Project Shoal was part of the Vela Uniform Program which was conducted to improve the US' ability to detect, identify, and locate underground nuclear detonations. The test consisted of detonating a 12-kiloton nuclear device deep underground in granitic rock to determine whether seismic waves produced by an underground nuclear test could be differentiated from seismic waves produced by a naturally occurring earthquake. The test was a joint effort conducted by the US Atomic Energy Commission (AEC) and the US Department of Defense (DoD) in October 1963 (AEC, 1964).

  1. North Slope (Wahluke Slope) expedited response action cleanup plan

    SciTech Connect

    Not Available

    1994-02-01

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

  2. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    SciTech Connect

    DOE /NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  3. Regulation of Rap GTPases in mammalian neurons.

    PubMed

    Shah, Bhavin; Püschel, Andreas W

    2016-10-01

    Small GTPases are central regulators of many cellular processes. The highly conserved Rap GTPases perform essential functions in the mammalian nervous system during development and in mature neurons. During neocortical development, Rap1 is required to regulate cadherin- and integrin-mediated adhesion. In the adult nervous system Rap1 and Rap2 regulate the maturation and plasticity of dendritic spine and synapses. Although genetic studies have revealed important roles of Rap GTPases in neurons, their regulation by guanine nucleotide exchange factors (GEFs) that activate them and GTPase activating proteins (GAPs) that inactivate them by stimulating their intrinsic GTPase activity is just beginning to be explored in vivo. Here we review how GEFs and GAPs regulate Rap GTPases in the nervous system with a focus on their in vivo function.

  4. A School Action Plan with Stakeholder Involvement: A Case Study of One Elementary School

    ERIC Educational Resources Information Center

    Getty, Jacob J., Jr.

    2011-01-01

    This case study focused on a school action plan, using a planning and implementation process that focused on improving stakeholder involvement and responsibility for student reading achievement at Eisenberg Elementary School. This study examined the impact of the school action process on the development of a new plan compared to other traditional…

  5. Cool Campus! A How-To Guide for College and University Climate Action Planning

    ERIC Educational Resources Information Center

    Simpson, Walter

    2009-01-01

    While a number of excellent campus climate planning resources are available, this guide attempts to fill a gap by providing an abundance of "how-to" information. The goal of the guide is to assist climate action planning teams at schools that are well versed in campus climate issues and well along in the CAP (Climate Action Planning) process as…

  6. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A...

  7. Smoking Cessation in Cardiac Patients: The Influence of Action Plans, Coping Plans and Self-Efficacy on Quitting Smoking

    ERIC Educational Resources Information Center

    de Hoog, Natascha; Bolman, Catherine; Berndt, Nadine; Kers, Esther; Mudde, Aart; de Vries, Hein; Lechner, Lilian

    2016-01-01

    Smoking cessation is the most effective action for cardiac patients who smoke to improve their prognosis, yet more than one-half of cardiac patients continue to smoke after hospital admission. This study examined the influence of action plans, coping plans and self-efficacy on intention to quit and smoking cessation in cardiac patients. Cardiac…

  8. Applicability of action planning and coping planning to dental flossing among Norwegian adults: a confirmatory factor analysis approach.

    PubMed

    Astrøm, Anne Nordrehaug

    2008-06-01

    Using a prospective design and a representative sample of 25-yr-old Norwegians, this study hypothesized that action planning and coping planning will add to the prediction of flossing at 4 wk of follow-up over and above the effect of intention and previous flossing. This study tested the validity of a proposed 3-factor structure of the measurement model of intention, action planning, and coping planning and for its invariance across gender. A survey was conducted in three Norwegian counties, and 1,509 out of 8,000 randomly selected individuals completed questionnaires assessing the constructs of action planning and coping planning related to daily flossing. A random subsample of 500 participants was followed up at 4 wk with a telephone interview to assess flossing. Confirmatory factor analysis (CFA) confirmed the proposed 3-factor model after respecification. Although the chi-square test was statistically significant [chi(2) = 58.501, degrees of freedom (d.f.) = 17), complementary fit indices were satisfactory [goodness-of-fit index (GFI) = 0.99, root mean squared error of approximation (RMSEA) = 0.04]. Multigroup CFA provided evidence of complete invariance of the measurement model across gender. After controlling for previous flossing, intention (beta = 0.08) and action planning (beta = 0.11) emerged as independent predictors of subsequent flossing, accounting for 2.3% of its variance. Factorial validity of intention, action planning and coping planning, and the validity of action planning in predicting flossing prospectively, was confirmed by the present study.

  9. Smoking cessation in cardiac patients: the influence of action plans, coping plans and self-efficacy on quitting smoking.

    PubMed

    de Hoog, Natascha; Bolman, Catherine; Berndt, Nadine; Kers, Esther; Mudde, Aart; de Vries, Hein; Lechner, Lilian

    2016-06-01

    Smoking cessation is the most effective action for cardiac patients who smoke to improve their prognosis, yet more than one-half of cardiac patients continue to smoke after hospital admission. This study examined the influence of action plans, coping plans and self-efficacy on intention to quit and smoking cessation in cardiac patients. Cardiac patients completed a baseline questionnaire (N = 245) assessing demographic characteristics, smoking behavior, intention, self-efficacy, relapse self-efficacy and action and coping plans. Six months later (N = 184) continued abstinence from smoking was assessed. Self-efficacy predicted intention to quit smoking and was an indirect predictor of continued abstinence, through intention. Intention to quit smoking and making action plans both directly influenced continued abstinence. Future interventions to facilitate smoking cessation in cardiac patients should put strong emphasis on enhancing self-efficacy and on making specific action plans to increase the likelihood of smoking cessation.

  10. Rap Music in School Counseling Based on Don Elligan's Rap Therapy

    ERIC Educational Resources Information Center

    Gonzalez, Tiphanie; Hayes, B. Grant

    2009-01-01

    In 2000, Don Elligan introduced Rap Therapy as a psychotherapeutic intervention for working with at-risk youths, primarily African American males whose identities were highly influenced by rap music. Rap music can engage a population of youth who often enter counseling apprehensively (Elligan 2000, 2004; Tillie-Allen, 2005). This article reviews…

  11. Anticipatory action planning in blind and sighted individuals

    PubMed Central

    Cavallo, Andrea; Ansuini, Caterina; Gori, Monica; Tinti, Carla; Tonelli, Alessia; Becchio, Cristina

    2017-01-01

    Several studies on visually guided reach-to-grasp movements have documented that how objects are grasped differs depending on the actions one intends to perform subsequently. However, no previous study has examined whether this differential grasping may also occur without visual input. In this study, we used motion capture technology to investigate the influence of visual feedback and prior visual experience on the modulation of kinematics by intention in sighted (in both full-vision and no-vision conditions), early-blind and late-blind participants. Results provide evidence of modulation of kinematics by intention to a similar degree under both full-vision and no-vision conditions. Moreover, they demonstrate that prior visual experience has little impact on the tailoring of grasping movements to intention. This suggests that sequential action planning does not depend on visual input, and may instead be ascribed to the function of multisensory-motor cortical network that operates and develops not only in light, but also in darkness. PMID:28304373

  12. Water Planning and Climate Change: Actionable Intelligence Yet?

    NASA Astrophysics Data System (ADS)

    Milly, P.

    2008-05-01

    alternative. What is to be done? Is climate-change information of sufficient strength to justify making decisions that differ from those that would be optimal under stationarity? I.e., does climate science provide "actionable intelligence" to water planners? A conservative approach to planning in the presence of climate change would begin with stationarity as a base and then superpose, with quantitative estimates of uncertainties, those model-projected changes that appear to be qualitatively robust. The current state of science suggests that the following changes could be considered robust: (1) reduction in the fraction of precipitation falling as snow and earlier seasonal melting of snow, with consequent seasonal redistribution of runoff and streamflow; (2) gradual sea-level rise with heightened risk of encroachment of saline water into coastal surface- and ground-water-supply sources; and (3) global redistribution of precipitation and resultant runoff, with regional focal points ("hot spots") of desiccation and moistening. Even considering the attendant uncertainties, the available information about these changes can significantly affect the cost-benefit-risk tradeoffs of existing and prospective water projects and, therefore, can rationally inform decisions about future courses of action or inaction.

  13. The sequential encoding of competing action goals involves dynamic restructuring of motor plans in working memory.

    PubMed

    Gallivan, Jason P; Bowman, Natasha A R; Chapman, Craig S; Wolpert, Daniel M; Flanagan, J Randall

    2016-06-01

    Recent neural and behavioral findings provide support for the influential idea that in situations in which multiple action options are presented simultaneously, we prepare action plans for each competing option before deciding between and executing one of those plans. However, in natural, everyday environments, our available action options frequently change from one moment to the next, and there is often uncertainty as to whether additional options will become available before having to select a particular course of action. Here, with the use of a target-directed reaching task, we show that in this situation, the brain specifies a competing action for each new, sequentially presented potential target and that recently formed action plans can be revisited and updated so as to conform with separate, more newly developed, plans. These findings indicate that the brain forms labile motor plans for sequentially arising target options that can be flexibly restructured to accommodate new motor plans.

  14. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    USDOE /NV

    1999-05-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document.

  15. National Action Plan: Priorities for Managing Freshwater Resources in a Changing Climate

    EPA Pesticide Factsheets

    The National Action Plan is based on the latest science on climate risks to freshwater resources. The Plan establishes a national goal to have government agencies and citizens collaboratively manage freshwater resources in response to a changing climate.

  16. Interference due to shared features between action plans is influenced by working memory span.

    PubMed

    Fournier, Lisa R; Behmer, Lawrence P; Stubblefield, Alexandra M

    2014-12-01

    In this study, we examined the interactions between the action plans that we hold in memory and the actions that we carry out, asking whether the interference due to shared features between action plans is due to selection demands imposed on working memory. Individuals with low and high working memory spans learned arbitrary motor actions in response to two different visual events (A and B), presented in a serial order. They planned a response to the first event (A) and while maintaining this action plan in memory they then executed a speeded response to the second event (B). Afterward, they executed the action plan for the first event (A) maintained in memory. Speeded responses to the second event (B) were delayed when it shared an action feature (feature overlap) with the first event (A), relative to when it did not (no feature overlap). The size of the feature-overlap delay was greater for low-span than for high-span participants. This indicates that interference due to overlapping action plans is greater when fewer working memory resources are available, suggesting that this interference is due to selection demands imposed on working memory. Thus, working memory plays an important role in managing current and upcoming action plans, at least for newly learned tasks. Also, managing multiple action plans is compromised in individuals who have low versus high working memory spans.

  17. Corrective Action Investigation plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfield, Nevada Test Site, Nevada, March 1999

    SciTech Connect

    ITLV

    1999-03-01

    The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

  18. Corrective Action Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada

    SciTech Connect

    D. S. Tobiason

    2000-05-01

    The purpose of this Corrective Action Plan is to provide the strategy and methodology to close the Area 25 Vehicle Washdown. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was performed during March 1999 at each CAS. Soil samples were collected at each CAS using a direct-push method. Soil samples were collected from the surface to depths of up to 2.7 m (9 ft) below ground surface. In addition, the gravel sump at CAS 25-07-02 (F and J Roads Pad) was sampled using a backhoe. Soil samples were collected from depths of 0 to 0.6 m (0 to 2 ft) below the gravel layer in the sump.

  19. Corrective Action Investigation Plan for Corrective Action Unit 500: Test Cell A Septic System, Nevada Test Site, Nevada

    SciTech Connect

    IT Las Vegas

    1999-01-27

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s), and may include solid waste management units, individual disposal sites, or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP will be used in conjunction with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998c), hereafter referred to as the Leachfield Work Plan. Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. This CAIP contains CAU-specific information including a facility description, environmental sample collection objectives, and the criteria for conducting site investigation activities at CAU 500. This CAIP addresses one of three leachfield systems associated with Test Cell A, which is located in Area 25 at the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (see Leachfield Work Plan Figure 1-1). Corrective Action Unit 500 is comprised of the Test Cell A Septic System (CAS 25-04-05) and the associated leachfield system presented in Figure 1-1 (FFACO, 1996).

  20. Rap Lyrics: Instruments for Language Arts Instruction.

    ERIC Educational Resources Information Center

    Jeremiah, Milford A.

    1992-01-01

    Offers suggestions for using rap lyrics to teach language skills. A brief overview of the sociocultural dimension of rap music and its literature, a theoretical orientation for the instructional methodology, and a curriculum model are presented. The prevalence of these musical forms can make them a valuable aid. (SLD)

  1. Nantucket, Ma. Climate Protection Action Plan: A Public Outreach Strategy

    NASA Astrophysics Data System (ADS)

    Petrik, C.; Stephenson, A.; Petsch, S.

    2009-12-01

    As communities and municipalities gain a better understanding of climate change, they are exploring the ways in which to work towards adaptation and mitigation. One strategy that the Island of Nantucket, Massachusetts turned toward is the drafting of a Climate Protection Action Plan (CPAP). The CPAP was developed during the summer of 2009 to meet three goals: (1) assist the Town of Nantucket in creating a framework to help them reduce CO2 emissions; (2) educate the municipality and community in techniques that promote energy efficiency and sustainability on the island; and (3) document past, present and future approaches adopted by the Town towards emissions reduction and energy sustainability. In particular, this project focused on using local strengths and natural resources identified by island stakeholders that may help the island to mitigate carbon emissions and adapt to climate change.. Drafting the CPAP provided community members and politicians with an opportunity to become better educated in the science of climate change and to learn how climate change will affect their community. On the island of Nantucket, leaders in the religious, civic, and political communities were brought into a conversation about how each group could contribute to reducing greenhouse gas emissions. A geosciences graduate student was brought into the CPAP team as a climate fellow to facilitate this conversation. This provided the foundation for stakeholder recommendations incorporated into the CPAP. This capacity-building model served as an effective way to create an informal learning environment about climate change that allowed members of the island community to directly participate in developing their locally appropriate climate protection strategy. The draft CPAP developed through this study and presented to the Town of Nantucket comprises assessments and recommendations in public research and education; building and energy efficiency; transportation; renewable energy; and carbon

  2. World Stroke Organization global stroke services guidelines and action plan.

    PubMed

    Lindsay, Patrice; Furie, Karen L; Davis, Stephen M; Donnan, Geoffrey A; Norrving, Bo

    2014-10-01

    Every two seconds, someone across the globe suffers a symptomatic stroke. 'Silent' cerebrovascular disease insidiously contributes to worldwide disability by causing cognitive impairment in the elderly. The risk of cerebrovascular disease is disproportionately higher in low to middle income countries where there may be barriers to stroke care. The last two decades have seen a major transformation in the stroke field with the emergence of evidence-based approaches to stroke prevention, acute stroke management, and stroke recovery. The current challenge lies in implementing these interventions, particularly in regions with high incidences of stroke and limited healthcare resources. The Global Stroke Services Action Plan was conceived as a tool to identifying key elements in stroke care across a continuum of health models. At the minimal level of resource availability, stroke care delivery is based at a local clinic staffed predominantly by non-physicians. In this environment, laboratory tests and diagnostic studies are scarce, and much of the emphasis is placed on bedside clinical skills, teaching, and prevention. The essential services level offers access to a CT scan, physicians, and the potential for acute thrombolytic therapy, however stroke expertise may still be difficult to access. At the advanced stroke services level, multidisciplinary stroke expertise, multimodal imaging, and comprehensive therapies are available. A national plan for stroke care should incorporate local and regional strengths and build upon them. This clinical practice guideline is a synopsis of the core recommendations and quality indicators adapted from ten high quality multinational stroke guidelines. It can be used to establish the current level of stroke services, target goals for expanding stroke resources, and ensuring that all stages of stroke care are being adequately addressed, even at the advanced stroke services level. This document is a start, but there is more to be done

  3. Aquatic ecosystem condition: The Fraser River Action Plan approach

    SciTech Connect

    Tuominen, T.; Raymond, B.; Sekela, M.; Reynoldson, T.

    1995-12-31

    A major goal of the Canadian government`s Fraser River Action Plan (FRAP) is to clean up existing pollution problems in the Fraser River Basin. In support of this goal, the Environmental Quality Assessment Program is assessing the quality of the aquatic environment, particularly with respect to contaminants. The program, conducted from 1993 to 1998, is to establish a baseline condition for the aquatic ecosystem against which the success of clean up efforts can be measured. The FRAP approach is to use a combination of contaminant exposure or stressor indicators and organism ``effects`` indicators. The focus is on three components of the aquatic ecosystem: (1) bed sediment, (2) resident fish and (3) benthos. A priority for the program is integration of the three components, wherever possible. Bed sediments, as indicators of contaminant stress, are sampled at fourteen reaches in the river and major tributaries. Two species of resident fish are sampled and analyzed for condition factors, enzyme induction, histopathology and contaminant content at each of nine sites in the basin. The resident fish data are providing a measure of contaminant exposure and effect. Organism community effects will be assessed by a study which is classifying approximately 200 tributary and mainstem sites based on benthos community structure. For the first time in a large river system in Canada, this benthos study uses a multivariate approach which relates a suite of chemical and physical characteristics to benthos community structure.

  4. Process safety management and interim or remedial action plans

    SciTech Connect

    Boss, M.J.; Henney, D.A.; Heitzman, V.K.; Day, D.W.

    1996-12-31

    Remedial Actions, including Interim Remedial Activities, often require the use of treatment facilities or stabilization techniques using on-site chemical processes. As such, the 29 CFR 1910.119 Process Safety Management (PSM) of Highly Hazardous Chemicals (PSM Standard) and the USEPA regulations for Risk Management Planning require that these chemicals and their attendant potential hazards be identified. A Hazard and Operation (HAZOP) study, Failure Mode and Effect Analysis (FMEA), Fault Tree Analysis, or equivalent graphic presentation of processes must be completed. These studies form a segment of the Process Hazard Analysis (PHA). HAZOP addresses each system and each element of a system that could deviate from normal operations and thus cause a hazard. A full assessment of each process is produced by looking at the hazards, consequences, causes and personnel protection needed. Many variables must be considered when choosing the appropriate PHA technique including the size of the plant, the number of processes, the types of processes, and the types of chemicals used. A mixture of these techniques may be required to adequately transmit information about the process being evaluated.

  5. NFE--Planning and Organizing for Action. Courier No. 27.

    ERIC Educational Resources Information Center

    ASPBAE Courier Service, 1983

    1983-01-01

    This issue contains six articles, reports, and essays on planning and organizing nonformal education in the Asian-South Pacific area. A chapter reprinted from "Planning Nonformal Education" discusses the need for planning, past efforts, and five steps in a strategy suggested for planning locally-oriented and target-specific nonformal…

  6. Gathering Strength: Canada's Aboriginal Action Plan. A Progress Report = Rassembler nos forces: Le plan d'action du Canada pour les questions autochtones. Rapport d'etape.

    ERIC Educational Resources Information Center

    Department of Indian Affairs and Northern Development, Ottawa (Ontario).

    Gathering Strength is an integrated government-wide plan to address the key challenges facing Canada's Aboriginal people. Following an initial section on reconciliation of historic grievances, this report describes initiatives in the four areas addressed by the action plan: (1) partnerships (all schools received public awareness materials;…

  7. The Role of Cue-Response Mapping in Motorvisual Impairment and Facilitation: Evidence for Different Roles of Action Planning and Action Control in Motorvisual Dual-Task Priming

    ERIC Educational Resources Information Center

    Thomaschke, Roland; Hopkins, Brian; Miall, R. Christopher

    2012-01-01

    Previous research has shown that actions impair the visual perception of categorically action-consistent stimuli. On the other hand, actions can also facilitate the perception of spatially action-consistent stimuli. We suggest that motorvisual impairment is due to action planning processes, while motorvisual facilitation is due to action control…

  8. Toward a Theoretical Framework for Understanding the Relationship between Situated Action and Planned Action Models of Behavior in Information Retrieval Contexts: Contributions from Phenomenology.

    ERIC Educational Resources Information Center

    Ng, Kwong Bor

    2002-01-01

    Discussion of human-computer interaction and planned action focuses on the belief that it is impossible to consider an action without an a priori plan, even according to the phenomenological position taken for granted by the situated action theory. Reports results of a quasi-experiment that focused on plan deviation within an information seeking…

  9. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-04-01

    6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005).

  10. A Strategic Action Plan for Advancing Math and Science Education in New Mexico 2007-2010

    ERIC Educational Resources Information Center

    New Mexico Public Education Department, 2007

    2007-01-01

    This Strategic Action Plan for Advancing Math and Science Education is an initial outline of strategies, actions, measures of progress, resources needed, timelines, and responsible parties. The Plan focuses on these three main goals: (1) increasing student interest, participation, and achievement in math and science; (2) raising public support and…

  11. 40 CFR 77.4 - Administrator's action on proposed offset plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Administrator's action on proposed offset plans. 77.4 Section 77.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) EXCESS EMISSIONS § 77.4 Administrator's action on proposed offset plans....

  12. Using Action Plans to Support Communication Programming for Children Who Are Deafblind

    ERIC Educational Resources Information Center

    Bruce, Susan M.

    2008-01-01

    The author describes the use of action plans to support 2 teachers' post-in-service implementation of communication strategies with 3 children who are deafblind. In the action plans, the teachers recorded changes in thinking and instructional practices under the 4 aspects of communication: form, function, content, and context. They also recorded…

  13. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    SciTech Connect

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  14. 24 CFR 248.233 - Approval of a plan of action that includes incentives.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING ACT AND OTHER AUTHORITIES PREPAYMENT OF LOW INCOME HOUSING MORTGAGES Prepayment and Plans of Action Under the Emergency Low Income Preservation Act of 1987 § 248.233 Approval of a plan of action...— (1) The housing will be retained as housing affordable for very low income families,...

  15. 76 FR 80205 - Instituting a National Action Plan On Women, Peace, And Security

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... Order 13595 of December 19, 2011 Instituting a National Action Plan On Women, Peace, And Security By the... hereby ordered as follows: Section 1. Policy. (a) The United States recognizes that promoting women's... policy and practice of the executive branch of the United States to have a National Action Plan on...

  16. Action Planning in Typically and Atypically Developing Children (Unilateral Cerebral Palsy)

    ERIC Educational Resources Information Center

    Craje, Celine; Aarts, Pauline; Nijhuis-van der Sanden, Maria; Steenbergen, Bert

    2010-01-01

    In the present study, we investigated the development of action planning in children with unilateral Cerebral Palsy (CP, aged 3-6 years, n = 24) and an age matched control group. To investigate action planning, participants performed a sequential movement task. They had to grasp an object (a wooden play sword) and place the sword in a hole in a…

  17. Building Energy Benchmarking in India: an Action Plan for Advancing the State-of-the-Art

    SciTech Connect

    Sarraf, Saket; Anand, Shilpi; Shukla, Yash; Mathew, Paul; Singh, Reshma

    2014-06-01

    This document describes an action plan for advancing the state of the art of commercial building energy benchmarking in the Indian context. The document is primarily intended for two audiences: (a) Research and development (R&D) sponsors and researchers can use the action plan to frame, plan, prioritize and scope new energy benchmarking R&D in order to ensure that their research is market relevant; (b) Policy makers and program implementers engaged in the deployment of benchmarking and building efficiency rating programmes can use the action plan for policy formulation and enforcement .

  18. 49 CFR 659.37 - Corrective action plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requiring corrective actions; and (2) Findings from safety and security reviews performed by the oversight..., DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight... that a proposed alternate action(s) has been implemented subject to oversight agency review...

  19. 42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action...

  20. 42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action...

  1. 42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action...

  2. 42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action...

  3. 42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action...

  4. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    SciTech Connect

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  5. Final consolidated action plan to Tiger Team. Volume 2, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  6. Final consolidated action plan to Tiger Team. Volume 1, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  7. Unfolding of the RAP-D3 helical bundle facilitates dissociation of RAP-receptor complexes.

    PubMed

    Estrada, Kristine; Fisher, Carl; Blacklow, Stephen C

    2008-02-12

    The receptor-associated protein (RAP) functions as an escort protein for receptors of the low-density lipoprotein receptor (LDLR) family by preventing premature intracellular binding of ligands and assisting with delivery of mature receptors to the cell surface. The modulation of affinity by pH is believed to play an important role in the escort function of RAP, because RAP binds tightly to proteins of the LDLR family at near-neutral pH early in the secretory pathway where its high affinity precludes premature binding of ligands but then dissociates from bound receptors at the lower pH of the Golgi compartment. The third domain of RAP (RAP-D3), which forms a three-helix bundle, is sufficient to reconstitute the escort activity. Here, we test the hypothesis that low-pH induced unfolding of the RAP-D3 helical bundle facilitates dissociation of RAP-receptor complexes. First, variants of RAP-D3 resistant to low pH-induced unfolding were constructed by replacing interior histidine residues with phenylalanines. In contrast to native RAP-D3, which exhibits an unfolding pKa of 6.3 and a Tm of 42 degrees C, the most hyperstable variant of RAP-D3, in which four histidine residues are replaced with phenylalanine, has an unfolding pKa of 4.8, and a Tm of 58 degrees C. The phenylalanine substitutions in RAP-D3 confer increased stability to pH-induced dissociation of complexes formed between RAP-D3 and a two-repeat fragment of the LDLR (LA3-4). When introduced into full-length RAP, the four mutations that confer hyperstability on RAP-D3 interfere with transport of endogenous LRP-1 to the cell surface in a dominant negative fashion under conditions where expression of normal RAP has no effect on LRP-1 transport. Our studies support a model in which low pH-dependent unfolding of RAP-D3 facilitates dissociation of RAP from the LA repeats of LDLR family proteins in the mildly acidic pH of the Golgi.

  8. Action Research to Support the Sustainability of Strategic Planning

    ERIC Educational Resources Information Center

    Antheil, Jane H.; Spinelli, Stephen, Jr.

    2011-01-01

    This article suggests that developing a strategic plan, even through a highly participative and data-driven process, is not sufficient to sustain change if implementation of the plan is not monitored as an organizational change event. To the degree that a strategic plan is institutionally transformative, monitoring change during implementation…

  9. M.A.P.S.: Mesa Action Planning System.

    ERIC Educational Resources Information Center

    Larson, Elizabeth J. Hunt

    This report describes implementation of a districtwide planning model in the Mesa, Arizona, Public Schools. Figures illustrate planning processes throughout the report. Intended as an implementive framework, the planning system's purposes are to assist decision making about resource allocation, program direction, progress measurement, and district…

  10. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    NASA Technical Reports Server (NTRS)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  11. Does action planning moderate the intention-habit interaction in the exercise domain? A three-way interaction analysis investigation.

    PubMed

    de Bruijn, Gert-Jan; Rhodes, Ryan E; van Osch, Liesbeth

    2012-10-01

    Both habit strength and action planning have been found to moderate the intention-exercise behaviour relationship, but no research exists that has investigated how habit strength and action planning simultaneously influence this relationship. The present study was designed to explore this issue in a prospective sample of undergraduate students (N = 415): action planning, habit strength, intention, attitudes, subjective norms and perceived behavioural control were assessed at baseline and exercise behaviour was assessed 2 weeks later. Both habit strength and action planning moderated the intention-exercise relationship, with stronger relationship at higher levels of planning or habit strength. Decomposing a significant action planning × habit strength × intention interaction showed that the strength of the intention-exercise relationship progressed linearly through levels of action planning and habit strength. These novel results show that action planning strengthens the intention-habit strength interaction in the exercise domain: exercise interventions should therefore focus on simultaneously bolstering action planning and habit strength.

  12. Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1

    SciTech Connect

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

  13. I Plan Therefore I Choose: Free-Choice Bias Due to Prior Action-Probability but Not Action-Value.

    PubMed

    Suriya-Arunroj, Lalitta; Gail, Alexander

    2015-01-01

    According to an emerging view, decision-making, and motor planning are tightly entangled at the level of neural processing. Choice is influenced not only by the values associated with different options, but also biased by other factors. Here we test the hypothesis that preliminary action planning can induce choice biases gradually and independently of objective value when planning overlaps with one of the potential action alternatives. Subjects performed center-out reaches obeying either a clockwise or counterclockwise cue-response rule in two tasks. In the probabilistic task, a pre-cue indicated the probability of each of the two potential rules to become valid. When the subsequent rule-cue unambiguously indicated which of the pre-cued rules was actually valid (instructed trials), subjects responded faster to rules pre-cued with higher probability. When subjects were allowed to choose freely between two equally rewarded rules (choice trials) they chose the originally more likely rule more often and faster, despite the lack of an objective advantage in selecting this target. In the amount task, the pre-cue indicated the amount of potential reward associated with each rule. Subjects responded faster to rules pre-cued with higher reward amount in instructed trials of the amount task, equivalent to the more likely rule in the probabilistic task. Yet, in contrast, subjects showed hardly any choice bias and no increase in response speed in favor of the original high-reward target in the choice trials of the amount task. We conclude that free-choice behavior is robustly biased when predictability encourages the planning of one of the potential responses, while prior reward expectations without action planning do not induce such strong bias. Our results provide behavioral evidence for distinct contributions of expected value and action planning in decision-making and a tight interdependence of motor planning and action selection, supporting the idea that the underlying

  14. 40 CFR 280.66 - Corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS... implementing agency should consider the following factors as appropriate: (1) The physical and...

  15. A soil plan of action to awaken society beyond 2015

    NASA Astrophysics Data System (ADS)

    Jones, Arwyn; Bampa, Francesca; Towers, Willie; Broll, Gabrielle; Vargas, Ronald

    2014-05-01

    suite of positive examples offered by soil enthusiasts is to provide a common platform appropriate to all parts of the world, with a common consensus on soil issues to be covered and be brought to the table of consumers. The Global Soil Partnership (GSP) is an interactive, responsive and voluntary partnership, open to governments, regional organizations, institutions and other stakeholders. One of the pillars of action aims to "Encourage investment, technical cooperation, policy, education awareness and extension in soil". In order to achieve this goal, a small regionally balanced committee was formed following the 3rd European Network on Soil Awareness conference in Aberdeen and the 2nd Global Soil Week in Berlin. This group produced a draft plan of action that will be submitted to the Intergovernmental technical Panel on Soils (ITPS) of the GSP. Some key points that we need to address are: finding new soil communicators to awake and engage the society and the political arena (e.g. actors, poets, artists, etc.); focusing on a harmonised public perception of soil and their importance for environment and society; re-introducing soil science into the school curricula as a cross-cutting discipline designing a coherent but flexible structure and ensuring a proper and logical constructive transition between each learning stage (e.g. training teachers, web-based courses/ web-based platform, etc.). REFERENCES Bouma J, Broll G, Crane TA, Dewitte O, Gardi C, Schulte RPO, Towers W (2012) Soil information in support of policy making and awareness raising. Current Opinion in Environmental Sustainability, 4, 552-558. EC (2006) (COM(2006)231 final) Communication from the Commission to the Council, the European Parliament, the European Economic and Social Committee of the Regions, Thematic Strategy for Soil Protection. (ed Commission E), Brussels, Belgium.

  16. Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David A. Strand

    2004-10-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554.

  17. Climatic Action Plan Project for the state of Veracruz (Mexico)

    NASA Astrophysics Data System (ADS)

    Tejeda, A.; Ochoa, C.

    2007-05-01

    With financing of the British Government and support of the National Institute of Ecology, from April of 2006 to March of 2008 an action plan which intends variability effects and climatic change for the state of Veracruz will be made. This plan will be taken to the state government and will be spread out to manufacturers, industrialists and population. Throughout the Gulf of Mexico, the state of Veracruz is a 745 km coast in length with a width that goes from 156 km in the center to 47 km in the north. The state has large mountains, forests, plains, rivers, cascades, lagoons and coasts. Veracruz is the 10th largest state in Mexico with a 72,420 km2 surface, it is located between 17°00' and 22°28' north latitude and between 93°95' and 98°38' west longitude. Because of the orographic effect, the Sierra Madre Oriental causes the existence of many types of climate, from dry to tropical forest, going through snow on the top of the Pico de Orizaba (5747m of altitude). The wind affects the coasts by not allowing to fish during a hundred days a year (particularly in winter), and on summer tropical waves and occasionally hurricanes affect rivers causing overflow and urban floods in fields. These phenomena do not have a regular affectation; they are subject to climate variability effects. Veracruz is the third state with most population in the country (7.1 million people in 2005), only surpassed by the state of Mexico and Mexico City. Although it occupies 3.7% of the national territory, Veracruz has 6.9% of human population in the country, and is the 6th state of PIB national contribution (240 thousands of millions pesos approximately). Of the possible effects of the climatic change the following can be expected: , , : Most of the coasts of the Gulf of Mexico, low and sandy, less of a meter on the sea level, represent the most vulnerable territory of Veracruz. Towns will be affected, the saline water will infiltrate until the phreatic mantles and the coast electrical

  18. Defense Acquisition Workforce: Actions Needed to Guide Planning Efforts and Improve Workforce Capability

    DTIC Science & Technology

    2015-12-01

    DEFENSE ACQUISITION WORKFORCE Actions Needed to Guide Planning Efforts and Improve Workforce Capability Report... Planning Efforts and Improve Workforce Capability Why GAO Did This Study GAO and others have found that DOD needs to take steps to ensure DOD...develop an acquisition workforce plan every 2 years. DOD issued a plan in 2010, in which it called for the department to increase the size of the

  19. The small GTPase Rap1b negatively regulates neutrophil chemotaxis and transcellular diapedesis by inhibiting Akt activation.

    PubMed

    Kumar, Sachin; Xu, Juying; Kumar, Rupali Sani; Lakshmikanthan, Sribalaji; Kapur, Reuben; Kofron, Matthew; Chrzanowska-Wodnicka, Magdalena; Filippi, Marie-Dominique

    2014-08-25

    Neutrophils are the first line of cellular defense in response to infections and inflammatory injuries. However, neutrophil activation and accumulation into tissues trigger tissue damage due to release of a plethora of toxic oxidants and proteases, a cause of acute lung injury (ALI). Despite its clinical importance, the molecular regulation of neutrophil migration is poorly understood. The small GTPase Rap1b is generally viewed as a positive regulator of immune cell functions by controlling bidirectional integrin signaling. However, we found that Rap1b-deficient mice exhibited enhanced neutrophil recruitment to inflamed lungs and enhanced susceptibility to endotoxin shock. Unexpectedly, Rap1b deficiency promoted the transcellular route of diapedesis through endothelial cell. Increased transcellular migration of Rap1b-deficient neutrophils in vitro was selectively mediated by enhanced PI3K-Akt activation and invadopodia-like protrusions. Akt inhibition in vivo suppressed excessive Rap1b-deficient neutrophil migration and associated endotoxin shock. The inhibitory action of Rap1b on PI3K signaling may be mediated by activation of phosphatase SHP-1. Thus, this study reveals an unexpected role for Rap1b as a key suppressor of neutrophil migration and lung inflammation.

  20. Alternatives/action plan report for outfall 17

    SciTech Connect

    1994-11-01

    This Document contains information pertaining to alternatives/action associated with controlling ammonia entering through outfall 17. This document identifies the location of contaminate source, the ammonia concentration levels entering East Fork Poplar Creek, and the action taken to reduce/eliminate the toxicity problem.

  1. A Career Development Plan for Community Action Agencies.

    ERIC Educational Resources Information Center

    Gartner, Alan; Jones, Nina

    A system for career advancement in the community action agency must be based on the fundamental principle that it is the responsibility of the community action agency to develop the full potential of the nonprofessional staff. The agency must take the initiative on several aspects of its policy and program. Nonprofessional employees must be able…

  2. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

  3. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    SciTech Connect

    T. M. Fitzmaurice

    2000-08-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

  4. Safe School: A Planning Guide for Action. 1995 Edition.

    ERIC Educational Resources Information Center

    California State Office of the Attorney General, Sacramento. Crime Prevention Center.

    This guidebook shows how schools can form partnerships with law-enforcement agencies and communities to develop a comprehensive safe-school plan. The planning guide is based on four principles: that safe schools are caring schools, are built through cooperative efforts of all stakeholders, communicate high standards, and stress prevention. This…

  5. A Social-Action Approach for Planning Education.

    ERIC Educational Resources Information Center

    Bolan, Richard S.; And Others

    The growing complexity of urban industrial society necessitates adequate planning techniques to insure future livability, but traditional methods of training planners have emphasized technology and ignored the human element. To remedy this deficiency, training programs should be expanded to include the social and political aspects of planning.…

  6. Vision 21: An Action Plan for the 21st Century.

    ERIC Educational Resources Information Center

    Cleveland Public Schools, OH.

    VISION 21 uses community and staff input and the most current thought on reform in education to create the schools Cleveland wants. The full implementation of its plans will result in a quality education for all the city's children. This document provides the framework within which VISION 21 was developed, the planning process used in its…

  7. Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-04-06

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  8. Multi-action planning for threat management: a novel approach for the spatial prioritization of conservation actions.

    PubMed

    Cattarino, Lorenzo; Hermoso, Virgilio; Carwardine, Josie; Kennard, Mark J; Linke, Simon

    2015-01-01

    Planning for the remediation of multiple threats is crucial to ensure the long term persistence of biodiversity. Limited conservation budgets require prioritizing which management actions to implement and where. Systematic conservation planning traditionally assumes that all the threats in priority sites are abated (fixed prioritization approach). However, abating only the threats affecting the species of conservation concerns may be more cost-effective. This requires prioritizing individual actions independently within the same site (independent prioritization approach), which has received limited attention so far. We developed an action prioritization algorithm that prioritizes multiple alternative actions within the same site. We used simulated annealing to find the combination of actions that remediate threats to species at the minimum cost. Our algorithm also accounts for the importance of selecting actions in sites connected through the river network (i.e., connectivity). We applied our algorithm to prioritize actions to address threats to freshwater fish species in the Mitchell River catchment, northern Australia. We compared how the efficiency of the independent and fixed prioritization approach varied as the importance of connectivity increased. Our independent prioritization approach delivered more efficient solutions than the fixed prioritization approach, particularly when the importance of achieving connectivity was high. By spatially prioritizing the specific actions necessary to remediate the threats affecting the target species, our approach can aid cost-effective habitat restoration and land-use planning. It is also particularly suited to solving resource allocation problems, where consideration of spatial design is important, such as prioritizing conservation efforts for highly mobile species, species facing climate change-driven range shifts, or minimizing the risk of threats spreading across different realms.

  9. Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0

    SciTech Connect

    Susan Evans

    2004-11-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release

  10. How You Move Is What I See: Planning an Action Biases a Partner's Visual Search.

    PubMed

    Dötsch, Dominik; Vesper, Cordula; Schubö, Anna

    2017-01-01

    Activating action representations can modulate perceptual processing of action-relevant dimensions, indicative of a common-coding of perception and action. When two or more agents work together in joint action, individual agents often need to consider not only their own actions and their effects on the world, but also predict the actions of a co-acting partner. If in these situations the action of a partner is represented in a functionally equivalent way to the agent's own actions, one may also expect interaction effects between action and perception across jointly acting individuals. The present study investigated whether the action of a co-acting partner may modulate an agent's perception. The "performer" prepared a grasping or pointing movement toward a physical target while the "searcher" performed a visual search task. The performer's planned action impaired the searcher's perceptual performance when the search target dimension was relevant to the performer's movement execution. These results demonstrate an action-induced modulation of perceptual processes across participants and indicate that agents represent their partner's action by employing the same perceptual system they use to represent an own action. We suggest that task representations in joint action operate along multiple levels of a cross-brain predictive coding system, which provides agents with information about a partner's actions when they coordinate to reach a common goal.

  11. Remedial Action Plan for Deer Lake Area of Concern, 1987

    EPA Pesticide Factsheets

    Stage I document details Deer Lake’s history of mercury and other contamination, and describes sources of pollution and future remedial actions, to address beneficial use impairments identified by the Great Lakes Water Quality Board (WQB).

  12. Corrective Action Investigation Plan for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David A. Strand

    2004-09-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 145: Wells and Storage Holes. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 145 is located in Area 3 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 145 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-20-01, Core Storage Holes; (2) 03-20-02, Decon Pad and Sump; (3) 03-20-04, Injection Wells; (4) 03-20-08, Injection Well; (5) 03-25-01, Oil Spills; and (6) 03-99-13, Drain and Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. One conceptual site model with three release scenario components was developed for the six CASs to address all releases associated with the site. The sites will be investigated based on data quality objectives (DQOs) developed on June 24, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQOs process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 145.

  13. Planning, preparation, execution, and imagery of volitional action.

    PubMed

    Deecke, L

    1996-03-01

    There are different motor sets, which a human subject can be in or act from: he or she can be in a self-initiated voluntary movement set (action) or in a response set (re-action). Also, imagery sets are available that are necessary for the acquisition and practice of skill. Most important are such imagery sets for rehearsal in theatre, dance, music, sports, combat, etc.

  14. IDENTIFYING HIGH PRIORITY EXPOSURE RESEARCH SUPPORTING THE EPA ASBESTOS ACTION PLAN

    EPA Science Inventory

    The EPA Asbestos Action Plan outlines areas, including two exposure assessment areas, where research is needed to reduce uncertainties in current asbestos risk assessments. Scientists from the National Exposure Research Laboratory (NERL) recently conducted survey and literature ...

  15. Case-Based Plan Recognition Using Action Sequence Graphs

    DTIC Science & Technology

    2014-10-01

    Kumaran, 2007), and probabilistic approaches (e.g., Bui, 2003; Charniak & Goldman, 1991, 1993; Geib & Goldman, 2009; Goldman, Geib & Miller, 1999...Sixteenth UK Workshop on Case-Based Reasoning. Cambridge, UK: Springer. Geib , C. W., & Goldman, R. P. (2009). A probabilistic plan recognition...and practice. San Mateo, CA: Morgan Kaufmann. Goldman, R.P., Geib , C.W., & Miller, C.A. (1999). A new model of plan recognition. Proceedings of the

  16. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    SciTech Connect

    Pava, Daniel S.

    2015-03-25

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) and integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.

  17. Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-05-08

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Station (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  18. Streamlined approach for environmental restoration plan for corrective action unit 416, Mud Pit, Project Shoal Area

    SciTech Connect

    1997-07-01

    This plan addresses the actions necessary for the restoration and closure of the Project Shoal Area (PSA), Surface Corrective Action Unit (CAU) 416, Mud Pit (Corrective Action Site No. 57-09-01), a pit that was used to store effluent produced during drilling of the Post-Shot Borehole PS-1 in 1963. This plan describes the activities that will occur at the site and the steps that will be taken to gather enough data to obtain a notice of completion from the Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented with the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996) and the Industrial Sites Quality Assurance Project Plan (DOE/NV, 1994). The SAFER process is being employed at this CAU where enough information exists about the nature and extent of contamination to propose an appropriate corrective action without completing a Corrective Action Decision Document and Corrective Action Plan. This process combines elements of the Data Quality Objective (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. This has already been completed for the mud pit so it will not be repeated here. The DQOs for the mud pit are presented in the Corrective Action Investigation Plan for Project Shoal Area, CAU No. 416 (DOE/NV, 1996). This observational approach provides a framework for managing uncertainty and planning decision making.

  19. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA

    SciTech Connect

    BECHTEL NEVADA

    2005-06-01

    Corrective Action Unit (CAU) 528: Polychlorinated Biphenyls Contamination is listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996) and is located in Area 25 of the Nevada Test Site. CAU 528 was created to address polychlorinated biphenyl (PCB) contamination identified during the CAU 262 corrective action investigation. CAU 528 consists of one Corrective Action Site (CAS): CAS 25-27-03, Polychlorinated Biphenyls Surface Contamination.

  20. Regulating Rap small G-proteins in time and space.

    PubMed

    Gloerich, Martijn; Bos, Johannes L

    2011-10-01

    Signaling by the small G-protein Rap is under tight regulation by its GEFs and GAPs. These are multi-domain proteins that are themselves controlled by distinct upstream pathways, and thus couple different extra- and intracellular cues to Rap. The individual RapGEFs and RapGAPs are, in addition, targeted to specific cellular locations by numerous anchoring mechanisms and, consequently, may control different pools of Rap. Here, we review the various activating signals and targeting mechanisms of these proteins and discuss their contribution to the spatiotemporal regulation and biological functions of the Rap proteins.