Science.gov

Sample records for action project oak

  1. Oak Canyon Action Memo

    EPA Pesticide Factsheets

    This memorandum requests approval for a time-critical removal action at the 27 residential properties that compose the Oak Canyon Site located in the Village of Paguate, Pueblo of Laguna, near Cibola County, New Mexico.

  2. Oak Tree Planting Project

    Treesearch

    Sherryl L. Nives; William D. Tietje; William H. Weitkamp

    1991-01-01

    An Oak Tree Planting Project was conducted during 1989/90 in San Luis Obispo County by the Integrated Hardwood Range Management Program (IHRMP)/Central Coast. The local media and an IHRMP workshop were used to publicize the Planting Project and give information on the status of oaks (Quercus spp.) in California and oak planting techniques. Outreach...

  3. Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee

    SciTech Connect

    1996-08-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant.

  4. Field grouting summary report on the WAG 4 seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2: Appendixes A--D

    SciTech Connect

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion data. The technical objective of the removal action was to reduce the off-site transport of Strontium 90 ({sup 90}Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70% of the {sup 90}Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 X 10{sup {minus}6} cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground. The main report describes brief background to the project, describes and analyzes the grouting operations, draws conclusions from the work performed, and presents some of the lessons learned. Appendices contain: (A) pipe driving records; (B) casing grout injection records; (C) in-situ hydraulic conductivity testing records; and (D) grout quality control testing records.

  5. Field grouting summary report on the WAG seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 1: Text

    SciTech Connect

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion date. The technical objective of the removal action was to reduce the off-site transport of Strontium 90 ({sup 90}Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70% of the {sup 90}Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 x 10{sup {minus}6} cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground.

  6. Field grouting summary report on the WAG 4 seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 3. Appendixes E and F

    SciTech Connect

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion date. The technical objective of the removal action was to reduce the off-site transport of j Strontium 90 ({sup 90}Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70 percent of the {sup 90}Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 x 10{sup -6} cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground.

  7. Best management practices plan for the Lower East Fork Poplar Creek remedial action project, Oak Ridge, Tennessee

    SciTech Connect

    1996-08-01

    The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee: the Oak Ridge Y-12 Plant, the K-25 Site, and the Oak Ridge National Laboratory (ORNL) managed by Lockheed Martin Environmental Research Corporation. All facilities are managed by Lockheed Martin Energy Systems, Incorporated (Energy Systems) for the DOE. The Y-12 Plant is adjacent to the city of Oak Ridge and is also upstream from Oak Ridge along East Fork Poplar Creek. The portion of the creek downstream from the Y-12 Plant is Lower East Fork Poplar Creek (LEFPC). This project will remove mercury-contaminated soils from the LEFPC floodplain, transport the soils to Industrial Landfill V (ILF-V), and restore any affected areas. This project contains areas that were designated in 1989 as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site. The site includes DOE property and portions of commercial, residential, agricultural, and miscellaneous areas within the city of Oak Ridge.

  8. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  9. Maintenance action readiness assessment plan for White Oak Creek and Melton Branch Weir Stilling Pool cleanout at Oak Ridge National Laboratory

    SciTech Connect

    1995-08-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the following maintenance action: (1) removal of sediment from the White Oak Creek and Melton Branch Weir Stilling Pools and (2) disposal of the radiologically contaminated sediment in another location upstream of the weirs in an area previously contaminated by stream overflow from Melton Branch in Waste Area Grouping 2 (WAG) at Oak Ridge National Laboratory. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act because the risk to human health and environment is well below the US Environmental Protection Agency`s level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. The administrative record is available for review at the US Department of Energy Information Resource Center, 105 Broadway Avenue, Oak Ridge, Tennessee 37830.

  10. The Take Action Project

    ERIC Educational Resources Information Center

    Boudreau, Sue

    2010-01-01

    The Take Action Project (TAP) was created to help middle school students take informed and effective action on science-related issues. The seven steps of TAP ask students to (1) choose a science-related problem of interest to them, (2) research their problem, (3) select an action to take on the problem, (4) plan that action, (5) take action, (6)…

  11. Program overview: Remedial actions at Oak Ridge National Laboratory

    SciTech Connect

    Bates, L.D.; Trabalka, J.R.

    1988-07-27

    Research on and development of civilian and defense uses of nuclear materials and technologies have occurred at Oak Ridge National Laboratory (ORNL) since its creation as part of the World War II Manhattan Project in 1943. A diverse legacy of contaminated inactive facilities, research areas, and waste management areas exists; many are candidates for remedial action. Most attention is focused on waste management sites which contain the bulk of ORNL's environmental contamination. A wide variety of liquid and solid wastes, primarily radioactive wastes or mixed wastes in which radioactivity was the principal hazardous constituent, have been disposed of on-site in the past 45 years. One potential approach to remedial problems at ORNL is to design primarily for control and decay in situ (during an institutional control period of 100 years or more) of intermediate-lived wastes such as /sup 3/H, /sup 90/Sr, and /sup 137/Cs. Passive measures designed to provide greater long-term confinement (for example, in situ vitrification) could be exercised at sites contaminated with TRU wastes or high concentrations of hazardous constitutes. This approach would (a) provide a period sufficiently long for evaluation of the effectiveness of environmental processes and passive remedial measures in controlling the migration of long-lived materials, (b) allow additional time needed for development of new technologies for more permanent site stabilization, and (c) reduce the need for immediate implementation of the more-expensive exhumation and disposal option.

  12. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment.

  13. Project plan for the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1992-08-01

    The Background Soil characterization Project (BSCP) will provide background concentration levels of selected metals, organic compounds, and radionuclides in soils from uncontaminated on-site areas at the Oak Ridge Reservation (ORR), and off-site in the western part of Roane County and the eastern part of Anderson County. The BSCP will establish a database, recommend how to use the data for contaminated site assessment, and provide estimates of the potential human health and environmental risks associated with the background level concentrations of potentially hazardous constituents.

  14. Oak Ridge National Laboratory Facilities Revitalization Project - Project Management Plan

    SciTech Connect

    Myrick, T.E.

    2000-06-06

    The Facilities Revitalization Project (FRP) has been established at Oak Ridge National Laboratory (ORNL) to provide new and/or refurbished research and support facilities for the Laboratory's science mission. The FRP vision is to provide ORNL staff with world-class facilities, consolidated at the X-10 site, with the first phase of construction to be completed within five years. The project will utilize a combination of U.S. Department of Energy (DOE), State of Tennessee, and private-sector funds to accomplish the new construction, with the facilities requirements to be focused on support of the ORNL Institutional Plan. This FRP Project Management Plan has been developed to provide the framework under which the project will be conducted. It is intended that the FRP will be managed as a programmatic office, with primary resources for execution of the project to be obtained from the responsible organizations within ORNL (Engineering, Procurement, Strategic Planning, etc.). The FRP Project Management Plan includes a definition of the project scope, the organizational responsibilities, and project approach, including detailed Work Breakdown Structure (WBS), followed by more detailed discussions of each of the main WBS elements: Project Planning Basis, Facility Deactivation and Consolidation, and New Facilities Development. Finally, a general discussion of the overall project schedule and cost tracking approach is provided.

  15. Oak Grove Fork Habitat Improvement Project, 1988 Annual Report.

    SciTech Connect

    Bettin, Scott

    1989-04-01

    The Lower Oak Grove Fork of the Clackamas River is a fifth-order tributary of the Clackamas River drainage supporting depressed runs of coho and chinook salmon, and summer and winter steelhead. Habitat condition rating for the Lower Oak Grove is good, but smelt production estimates are below the average for Clackamas River tributaries. Limiting factors in the 3.8 miles of the Lower Oak Grove supporting anadromous fish include an overall lack of quality spawning and rearing habitat. Beginning in 1986. measures to improve fish habitat in the Lower Oak Grove were developed in coordination with the Oregon Department of Fish and Wildlife (ODF&W) and Portland General Electric (PGE) fisheries biologists. Prior to 1986, no measures had been applied to the stream to mitigate for PGE's storage and regulation of flows in the Oak Grove Fork (Timothy Lake, Harriet Lake). Catchable rainbow trout are stocked by ODF&W two or three times a year during the trout fishing season in the lowermost portion of the Oak Grove Fork near two Forest Service campgrounds (Ripplebrook and Rainbow). The 1987 field season marked the third year of efforts to improve fish habitat of the Lower Oak Grove Fork and restore anadromous fish production. The efforts included the development of an implementation plan for habitat improvement activities in the Lower Oak Grove Fork. post-project monitoring. and maintenance of the 1986 improvement structures. No new structures were constructed or placed in 1987. Fiscal year 1988 brought a multitude of changes which delayed implementation of plans developed in 1987. The most prominent change was the withdrawal of the proposed Spotted Owl Habitat Area (SOHA) which overlapped the Oak Grove project implementation area. Another was the change in the Forest Service biologist responsible for implementation and design of this project.

  16. Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    Voskuil, T.L.

    1993-09-01

    Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent from buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project`s cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion.

  17. Data management implementation plan for interim action at the Gunite and Associated Tanks, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    The Gunite and Associated Tanks (GAAT) Project is currently conducting a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Interim Remedial Action to reduce uncertainties on the potential cost and effectiveness of remote tank cleaning equipment being produced jointly between the US Department of Energy (DOE); Oak Ridge National Laboratory (ORNL); Lockheed Martin Energy Systems, Inc.; and associated subcontractors with the DOE EM-50 Program. The goal of this document is to ensure that all procedures have been followed to provide reliable, verifiable data that are technically defensible. The data collected will be used to support closure of the tanks, compare the expected versus actual waste volume and curies to aid in conducting operations, and verify the performance of developmental equipment.

  18. Melton Valley Storage Tanks Capacity Increase Project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1995-04-01

    The US Department of Energy (DOE) proposes to construct and maintain additional storage capacity at Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee, for liquid low-level radioactive waste (LLLW). New capacity would be provided by a facility partitioned into six individual tank vaults containing one 100,000 gallon LLLW storage tank each. The storage tanks would be located within the existing Melton Valley Storage Tank (MVST) facility. This action would require the extension of a potable water line approximately one mile from the High Flux Isotope Reactor (HFIR) area to the proposed site to provide the necessary potable water for the facility including fire protection. Alternatives considered include no-action, cease generation, storage at other ORR storage facilities, source treatment, pretreatment, and storage at other DOE facilities.

  19. The Oak Ridge Isochronous Cyclotron Refurbishment Project

    SciTech Connect

    Mendez, II, Anthony J; Ball, James B; Dowling, Darryl T; Mosko, Sigmund W; Tatum, B Alan

    2011-01-01

    The Oak Ridge Isochronous Cyclotron (ORIC) has been in operation for nearly fifty years at the Oak Ridge National Laboratory (ORNL). Presently, it serves as the driver accelerator for the ORNL Holifield Radioactive Ion Beam Facility (HRIBF), where radioactive ion beams are produced using the Isotope Separation Online (ISOL) technique for post-acceleration by the 25URC tandem electrostatic accelerator. Operability and reliability of ORIC are critical issues for the success of HRIBF and have presented increasingly difficult operational challenges for the facility in recent years. In February 2010, a trim coil failure rendered ORIC inoperable for several months. This presented HRIBF with the opportunity to undertake various repairs and maintenance upgrades aimed at restoring the full functionality of ORIC and improving the reliability to a level better than what had been typical over the previous decade. In this paper, we present details of these efforts, including the replacement of the entire trim coil set and measurements of their radial field profile. Comparison of measurements and operating tune parameters with setup code predictions will also be presented.

  20. Action memorandum for the Waste Area Grouping 1 Tank WC-14 removal action at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1994-11-01

    This action memorandum documents approval for a Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (CERCLA), time-critical action. The action will remove radiologically contaminated water from Tank WC-14. The water contains a polychlorinated biphenyl (PCB) at a level below regulatory concern. Tank WC-14 is located in the Waste Area Grouping (WAG) 1 WC-10 Tank Farm at the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. Contaminated sludge remaining in the tank after removal of the liquid will be the subject of a future action.

  1. Project management plan for the gunite and associated tanks treatability studies project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1995-12-01

    This plan for the Gunite and Associated Tanks (GAAT) Treatability Studies Project satisfies the requirements of the program management plan for the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program as established in the Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program. This plan is a subtier of several other ER documents designed to satisfy the US Department of Energy (DOE) Order 4700.1 requirement for major systems acquisitions. This project management plan identifies the major activities of the GAAT Treatability Studies Project; establishes performance criteria; discusses the roles and responsibilities of the organizations that will perform the work; and summarizes the work breakdown structure, schedule, milestones, and cost estimate for the project.

  2. Oak Ridge Dose Reconstruction Project Summary Report; Reports of the Oak Ridge Dose Reconstruction, Vol. 7

    SciTech Connect

    Thomas E. Widner; et. al.

    1999-07-01

    In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel of individuals appointed by Tennessee's Commissioner of Health. The panel requested that the principal investigator for the project prepare the following report, ''Oak Ridge Dose Reconstruction Project Summary Report,'' to serve the following purposes: (1) summarize in a single, less technical report, the methods and results of the various investigations that comprised the Phase II of the dose reconstruction; (2) describe the systematic searching of classified and unclassified historical records that was a vital component of the project; and (3) summarize the less detailed, screening-level assessments that were performed to evaluate the potential health significance of a number of materials, such a uranium, whose priority did not require a complete dose reconstruction effort. This report describes each major step of the dose reconstruction study: (1) the review of thousands of historical records to obtain information relating to past operations at each facility; (2) estimation of the quantity and timing of releases of radioiodines from X-10, of mercury from Y-12, of PCB's from all facilities, and of cesium-137 and other radionuclides from White Oak Creek; (3) evaluation of the routes taken by these contaminants through the environment to nearby populations; and (4) estimation of doses and health risks to exposed groups. Calculations found the highest excess cancer risks for a female born in 1952 who drank goat milk; the highest non-cancer health risk was for children in a farm family exposed to PCBs in and near East Fork Poplar Creek. More detailed

  3. Removal action report on Waste Area Grouping 4 seeps 4 and 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1996-12-01

    This report documents removal action activities for a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) non-time-critical removal action as described in the Action Memorandum prepared in 1996. The technical objective of this removal action was to reduce the release of strontium 90 ({sup 90}Sr) into an ephemeral tributary to White Oak Creek from Waste Area Grouping 4 (WAG 4) seeps, as measured at Monitoring Station (MS) 1 at ORNL, Oak Ridge, TN. Design was initiated in early January 1996 and grouting activities were completed in late October 9996. Portions of four waste disposal trenches were injected using low-temperature permeation grouting technology with multiple formulations of grouts to reduce the in situ hydraulic conductivity of the waste materials and ultimately reduce the off-site transport of {sup 90}Sr.

  4. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  5. Maintenance Action Readiness Assessment Plan for Waste Area Grouping 1 inactive Tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1995-07-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the maintenance action consisting of remediation of four inactive liquid low-level radioactive tanks in Waste Area Grouping 1 at Oak Ridge National Laboratory. The four tanks to be remediated are Tanks 3001-B, 3004-B, T-30, and 3013. Tanks 3001-B, 3004-B, and T-30 will be removed from the ground. Because of logistical issues associated with excavation and site access, Tank 3013 will be grouted in place and permanently closed. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act, because the risk to human health and environment is well below the US Environmental Protection Agency`s level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. A Readiness Assessment Team has been assembled to review the criteria deemed necessary to conduct the remediation tasks. These criteria include approval of all plans, acquisition of needed equipment, completion of personnel training, and coordination with plant health and safety personnel. Once the criteria have been met and documented, the task will begin. The readiness assessment is expected to be completed by late July 1995, and the task will begin thereafter.

  6. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  7. Annual report on the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee: Results of Phase 1 investigation

    SciTech Connect

    Watkins, D.R.; Goddard, P.L.; Hatmaker, T.L.; Hook, L.A.; Jackson, B.L.; Kimbrough, C.W.; Lee, S.Y.; Lietzke, D.A.; McGin, C.W.; Nourse, B.D.; Schmoyer, R.L.; Shaw, R.A.; Stinnette, S.E.; Switek, J.; Wright, J.C.; Ammons, J.T.; Branson, J.L.; Burgoa, B.B.; Lietzke, D.A.

    1993-05-01

    Many constituents of potential concern for human health occur naturally at low concentrations in undisturbed soils. The Background soil Characterization Project (BSCP) was undertaken to provide background concentration data on potential contaminants in natural soils on the Oak Ridge Reservation (ORR). The objectives of the BSCP are to provide baseline data for contaminated site assessment and estimates of potential human health risk associated with background concentrations of hazardous and other constituents in native soils. This report presents, evaluates, and documents data and results obtained in Phase I of the project. It is intended to be a stand-alone document for application and use in structuring and conducting remedial investigation and remedial action projects in the Environmental Restoration (ER) Program.

  8. Napa River Restoration Project: Oakville to Oak Knoll Reach, Group C Site 14

    EPA Pesticide Factsheets

    Information about the SFBWQP Napa River Restoration Project: Oakville to Oak Knoll Reach, Group C Site 14, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  9. Napa River Restoration Project: Rutherford Reach Completion and Oakville to Oak Knoll Reach

    EPA Pesticide Factsheets

    Information about the SFBWQP Napa River Restoration Project: Rutherford Reach Completion/Oakville to Oak Knoll, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  10. Preliminary engineering report waste area grouping 5, Old Hydrofracture Facility Tanks content removal project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1996-06-01

    The Superfund Amendments and Reauthorization Act of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facilities Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the U.S. Department of Energy (DOE) Oak Ridge Operations Office, the U.S. Environmental Protection Agency (EPA) Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA is January 1, 1992. One objective of the FFA is to ensure that liquid low-level waste (LLLW) tanks that are removed from service are evaluated and remediated through the CERCLA process. Five inactive LLLW tanks, designated T-1, T-2, T-3, T-4, and T-9, located at the Old Hydrofracture (OHF) Facility in the Melton Valley area of Oak Ridge National Laboratory (ORNL) have been evaluated and are now entering the remediation phase. As a precursor to final remediation, this project will remove the current liquid and sludge contents of each of the five tanks (System Requirements Document, Appendix A). It was concluded in the Engineering Evaluation/Cost Analysis [EE/CA] for the Old Hydrofracture Facility Tanks (DOE 1996) that sluicing and pumping the contaminated liquid and sludge from the five OHF tanks was the preferred removal action. Evaluation indicated that this alternative meets the removal action objective and can be effective, implementable, and cost-effective. Sluicing and removing the tank contents was selected because this action uses (1) applicable experience, (2) the latest information about technologies and techniques for removing the wastes from the tanks, and (3) activities that are currently acceptable for storage of transuranic (TRU) mixed waste.

  11. Final report on the Background Soil Characterization Project at the Oak Ridge Reservation, Oak Ridge, Tennessee. Volume 3: Project Plan

    SciTech Connect

    Hatmaker, T.L.; Hook, L.A.; Jackson, B.L.

    1993-10-01

    The Background Soil Characterization Project (BSCP) will provide background concentration levels of selected metals, organic compounds, and radionuclides in soils from uncontaminated on-site areas at the Oak Ridge Reservation (ORR), and off-site in the western part of Roane County and the eastern part of Anderson County. The BSCP will establish a database, recommend how to use the data for contaminated site assessment, and provide estimates of the potential human health and environmental risks associated with the background level concentrations of potentially hazardous constituents. ORR background soil characterization data will be used for two purposes. The first application will be in differentiating between naturally occurring constituents and site-related contamination. This is a very important step in a risk assessment because if sufficient background data are not available, no constituent known to be a contaminant can be eliminated from the assessment even if the sampled concentration is measured at a minimum level. The second use of the background data will be in calculating baseline risks against which site-specific contamination risks can be compared.

  12. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs.

  13. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1996-03-01

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

  14. Oak Ridge Y-12 Plant Emergency Action Level (EAL) Process

    SciTech Connect

    Bailiff, E.G.; Bolling, J.D.

    2000-08-01

    This report establishes requirements and standard methods for the development and maintenance of the Emergency Action Level (EAL) Process used by all lead and event contractors for emergency planning and preparedness. The EAL process ensures a technically defensible approach to emergency categorization/classification in accordance with DOE Order 151.1. The instructions provided in this document include methods and requirements for the development and approval of the EAL process. EALs are developed to cover events inside and outside the Y-12 Plant and to allow the Emergency Response Organization (ERO) to classify or reclassify events promptly based on specific indicators. This report is divided into the following 11 subsections: (1) EAL Process, (2) Categorization/Classification System for Operational Emergencies, (3) Development of EALs, (4) Barrier Analysis for EALs, (5) Symptom-Based and Event-Based EALs, (6) Other Considerations, (7) Integration of EALs with Normal and Off-Normal Operations, (8) EAL Manual, (9) Testing EALs for Completeness, (10) Training and Implementation of EALs, and (11) Configuration Management.

  15. Cold test plan for the Old Hydrofracture Facility tank contents removal project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1997-11-01

    This Old Hydrofracture Facility (OHF) Tanks Contents Removal Project Cold Test Plan describes the activities to be conducted during the cold test of the OHF sluicing and pumping system at the Tank Technology Cold Test Facility (TTCTF). The TTCTF is located at the Robotics and Process Systems Complex at the Oak Ridge National Laboratory (ORNL). The cold test will demonstrate performance of the pumping and sluicing system, fine-tune operating instructions, and train the personnel in the actual work to be performed. After completion of the cold test a Technical Memorandum will be prepared documenting completion of the cold test, and the equipment will be relocated to the OHF site.

  16. Community-Based Ecological Restoration: The Wingra Oak Savanna Project.

    ERIC Educational Resources Information Center

    Bader, Brian J.; Egan, Dave

    1999-01-01

    The University of Wisconsin-Madison Arboretum, a pioneer in ecological restoration, is involving the local community in restoring a site to its presettlement condition as an oak savanna. Besides providing the manual labor of restoration, volunteers learn about the land and the ecological processes that tie nature and culture together. A 60-hour…

  17. Community-Based Ecological Restoration: The Wingra Oak Savanna Project.

    ERIC Educational Resources Information Center

    Bader, Brian J.; Egan, Dave

    1999-01-01

    The University of Wisconsin-Madison Arboretum, a pioneer in ecological restoration, is involving the local community in restoring a site to its presettlement condition as an oak savanna. Besides providing the manual labor of restoration, volunteers learn about the land and the ecological processes that tie nature and culture together. A 60-hour…

  18. Quality assurance plan for the molten salt reactor experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1998-02-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by Molten Salt Reactor Experiment (MSRE) Remediation Project personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description, Y/QD-15 Rev. 2 (Martin Marietta Energy Systems, Inc., 1995) and Environmental Management and Enrichment Facilities Work Smart Standards. This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRE Remediation Project. This QAP will be periodically reviewed, revised, and approved as necessary. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan.

  19. Final report on the Background Soil Characterization Project at the Oak Ridge Reservation, Oak Ridge, Tennessee. Volume 2: Data

    SciTech Connect

    Not Available

    1993-10-01

    The Background Soil Characterization Project (BSCP) will provide background concentration levels of selected metals organic compounds, and radionuclides in soils from uncontaminated on-site areas at the Oak Ridge Reservation (ORR), and off-site in the western part of Roane County and the eastern part of Anderson County. The BSCP will establish a database, recommend how to use the data for contaminated site assessment, and provide estimates of the potential human health and environmental risks associated with the background level concentrations of potentially hazardous constituents. This volume contains the data from the Background Soil Characterization Project. When available, the following validation qualifiers are used in the appendixes. When validation qualifiers are not available, the corresponding contract laboratory data qualifiers appearing on the next page are used.

  20. Quality assurance project plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1996-07-01

    The Chestnut Ridge Fly Ash Pond Stabilization (CRFAPS) Project will stabilize a 19-m-high (62-ft-high) earthen embankment across Upper McCoy Branch situated along the southern slope of Chestnut Ridge. This task will be accomplished by raising the crest of the embankment, reinforcing the face of the embankment, removing trees from the face and top of the embankment, and repairing the emergency spillway. The primary responsibilities of the team members are: Lockheed Martin Energy Systems, Inc., (Energy Systems) will be responsible for project integration, technical support, Title 3 field support, environmental oversight, and quality assurance (QA) oversight of the project; Foster Wheeler Environmental Corporation (FWENC) will be responsible for design and home office Title 3 support; MK-Ferguson of Oak Ridge Company (MK-F) will be responsible for health and safety, construction, and procurement of construction materials. Each of the team members has a QA program approved by the US Department of Energy (DOE) Oak Ridge Operations. This project-specific QA project plan (QAPP), which is applicable to all project activities, identifies and integrates the specific QA requirements from the participant`s QA programs that are necessary for this project.

  1. Napa River Restoration Project: Oakville to Oak Knoll Reach, Group A Sites 21-23

    EPA Pesticide Factsheets

    Information about the SFBWQP Napa River Restoration Project: Oakville to Oak Knoll Reach, Group A Sites 21-23, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources

  2. Final deactivation project report on the Integrated Process Demonstration Facility, Building 7602 Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1997-09-01

    The purpose of this report is to document the condition of the Integrated Process Demonstration Facility (Building 7602) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities by the High Ranking Facilities Deactivation Project (HRFDP). This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the U.S. Department of Energy (DOE) Environmental Restoration EM-40 Program. This report provides a history and description of the facility prior to commencing deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S&M) Plan, remaining hazardous and radioactive materials inventory, radiological controls, Safeguards and Security, and supporting documentation provided in the Office of Nuclear Material and Facility Stabilization Program (EM-60) Turnover package are discussed.

  3. Waste Operations Evaluations Project Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Lee, M.; Hart, A.; Moon, S.; Ferre, M.

    2006-07-01

    The DOE Western Environmental Technology Office (WETO) is supporting Oak Ridge National Laboratory (ORNL) by conducting an evaluation of the Liquid and Gaseous Waste Operations (LGWO) at ORNL for future waste generation. In August 2003, UT-Battelle issued The ORNL Liquid and Gaseous Waste Treatment System Strategic Plan that provides their prioritized road-map for the development of cost-effective and upgraded liquid and gaseous waste collection and treatment systems as a part of the revitalization effort to modernize ORNL. Waste management activities at ORNL for process waste, liquid low level waste, and gaseous waste are currently managed by Bechtel Jacobs Company LLC (BJC), the DOE Office of Environmental Management (EM) management and integrating contractor. DOE-EM's mission is currently planned to end at the ORNL site when the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision requirements for Bethel and Melton Valleys have been implemented, which is expected to be in the 2015 time frame. DOE-EM proposes to transfer responsibility for newly generated waste management to the U.S. Department of Energy Office of Science (DOE-SC) by 2006. After the release of the LGWTS Strategic Plan, DOE-EM requested that MSE Technology Applications, Inc. (MSE) conduct an evaluation of the LGWO as an independent party to assist DOE-EM in their decision-making process to transfer waste management responsibilities to DOE-SC. During fiscal year 2004, MSE designed a draft interactive model to create a material balance around the LGWO Facilities. The model consisted of a series of electronic spreadsheets showing the inputs, outputs, and interactions of all of the LGWO systems. MSE expanded on the model during fiscal year 2005 and used the model to evaluate ORNL's future waste treatment needs. In addition to the interactive model, MSE determined the future waste generators, estimated volume of waste streams for fiscal year 2015, and

  4. Lifecycle baseline summary for ADS 6504IS isotopes facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1995-08-01

    The scope of this Activity Data Sheet (ADS) is to provide a detailed plan for the Isotopes Facilities Deactivation Project (IFDP) at the Oak Ridge National Laboratory (ORNL). This project places the former isotopes production facilities in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S&M) until the facilities are included in the Decontamination and Decommissioning (D&D) Program. The facilities included within this deactivation project are Buildings 3026-C, 3026-D, 3028, 3029, 3038-AHF, 3038-E, 3038-M, 3047, 3517, 7025, and the Center Circle Facilities (Buildings 3030, 3031, 3032, 3033, 3033-A, 3034, and 3118). The scope of deactivation identified in this Baseline Report include surveillance and maintenance activities for each facility, engineering, contamination control and structural stabilization of each facility, radioluminescent (RL) light removal in Building 3026, re-roofing Buildings 3030, 3118, and 3031, Hot Cells Cleanup in Buildings 3047 and 3517, Yttrium (Y) Cell and Barricades Cleanup in Building 3038, Glove Boxes & Hoods Removal in Buildings 3038 and 3047, and Inventory Transfer in Building 3517. For a detailed description of activities within this Work Breakdown Structure (WBS) element, see the Level 6 and Level 7 Element Definitions in Section 3.2 of this report.

  5. Data base management activities for the Remedial Action Program at Oak Ridge National Laboratories (ORNL)

    SciTech Connect

    Hook, L.A.; Voorhees, L.D.; Gentry, M.J.; Faulkner, M.A.; Shaakir-Ali, J.A.; Newman, K.A.; McCord, R.A.; Goins, L.F.; Owen, P.T.

    1990-07-01

    The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP) was established in 1985 in response to state and federal regulations requiring comprehensive control over facility discharges and cleanup of contaminated sites. A computerized Data and Information Management System (DIMS) was developed for RAP to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated facilities and sites. The current status of DIMS and its role in supporting RAP during 1989 are described. The DIMS consists of three components: (1) the Numeric Data Base, (2) the Bibliographic Data Base, and (3) the Records Control Data Base. This report addresses all three data bases, but focuses on the contents of the Numeric Data Base. Significant progress was made last year with the geographic information system (GIS) and ARC/INFO, which can be interfaced with SAS/GRAPH to provide combined mapping and statistical graphic products. Several thematic layers of GIS data for the Oak Ridge Reservation are now available. 18 refs., 8 figs., 19 tabs.

  6. Contingency plan for the Old Hydrofracture Facility Tanks Sluicing Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1998-06-01

    This revised contingency plan addresses potential scenarios involving the release of radioactively contaminated waste from the Old Hydrofracture Facility Tanks Contents Removal project to the environment. The tanks are located at the Oak Ridge National Laboratory. The project involves sluicing the contents of the five underground tanks to mix the sludge and supernatant layers, and pumping the mixture to the Melton Valley Storage Tanks (MVST) for future processing. The sluicing system to be used for the project consists of a spray nozzle designated the {open_quotes}Borehole Miner,{close_quotes} with an associated pump; in-tank submersible pumps to transfer tank contents from the sluice tanks to the recycle tank; high-pressure pumps providing slurry circulation and slurry transport to the MVST; piping; a ventilation system; a process water system; an instrumentation and control system centered around a programmable logic controller; a video monitoring system; and auxiliary equipment. The earlier version of this plan, which was developed during the preliminary design phase of the project, identified eight scenarios in which waste from the tanks might be released to the environment as a result of unanticipated equipment failure or an accident (e.g., vehicular accident). One of those scenarios, nuclear criticality, is no longer addressed by this plan because the tank waste will be isotopically diluted before sluicing begins. The other seven scenarios have been combined into three, and a fourth, Borehole Miner Failure, has been added as follows: (1) underground release from the tanks; (2) aboveground release or spill from the sluicing system, a tank riser, or the transfer pipeline; (3) release of unfiltered air through the ventilation system; and (4) Borehole Miner arm retraction failure. Methods for preventing, detecting, and responding to each release scenario are set out in the plan.

  7. Oak Ridge National Laboratory Technology Logic Diagram. Volume 2, Technology Logic Diagram: Part B, Remedial Action

    SciTech Connect

    Not Available

    1993-09-01

    The Oak Ridge National Laboratory Technology Logic Diagram (TLD) was developed to provide a decision support tool that relates environmental restoration (ER) and waste management (WM) problems at Oak Ridge National Laboratory (ORNL) to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed to develop these technologies to a state that allows technology transfer and application to decontamination and decommissioning (D&D), remedial action (RA), and WM activities. The TLD consists of three fundamentally separate volumes: Vol. 1 (Technology Evaluation), Vol. 2 (Technology Logic Diagram), and Vol. 3 (Technology Evaluation Data Sheets). Part A of Vols. 1. and 2 focuses on D&D. Part B of Vols. 1 and 2 focuses on the RA of contaminated facilities. Part C of Vols. 1 and 2 focuses on WM. Each part of Vol. 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the rankings of remedial technologies. Volume 2 (Pts. A, B, and C) contains the logic linkages among EM goals, environmental problems, and the various technologies that have the potential to solve these problems. Volume 3 (Pts. A, B, and C) contains the TLD data sheets. Remedial action is the focus of Vol. 2, Pt. B, which has been divided into the three necessary subelements of the RA: characterization, RA, and robotics and automation. Each of these sections address general ORNL problems, which are then broken down by problem area/constituents and linked to potential remedial technologies. The diagrams also contain summary information about a technology`s status, its science and technology needs, and its implementation needs.

  8. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 1, Revision 5

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  9. Waste management plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    This waste management plan defines the procedures for control and management of waste generated as a result of the removal action of the YS-86O Firing Ranges site at the Oak Ridge Y-12 Plant. This document includes plan objectives; remediation activities; key personnel; waste generation activities; and waste treatment, storage, transportation, and disposal. Methods of control and characterization of waste generated as a result of remediation activities will be within the guidelines and procedures outlined herein. ENTECH personnel will make every effort when conducting remediation and decontamination activities to minimize the amount of generated waste.

  10. Action Learning: Student Community Service Projects.

    ERIC Educational Resources Information Center

    Aronstein, Laurence W.; Olsen, Edward G.

    By engaging students in community service projects, action learning uses resources of the real world to give students opportunities to participate in performing tasks and making decisions that confront societal problems. Such projects should be decided on after a study of the needs of the community. After a project is selected, all relevant…

  11. Oak Ridge National Laboratory Technology Logic Diagram. Volume 1, Technology Evaluation: Part B, Remedial Action

    SciTech Connect

    Not Available

    1993-09-01

    The Oak Ridge National Laboratory Technology Logic Diagram (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) and waste management (WM) problems at Oak Ridge National Laboratory (ORNL) to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed to develop these technologies to a state that allows technology transfer and application to decontamination and decommissioning (D&D), remedial action (RA), and WM activities. The TLD consists of three fundamentally separate volumes: Vol. 1 (Technology Evaluation), Vol. 2 (Technology Logic Diagram), and Vol. 3 (Technology Evaluation Data Sheets). Part A of Vols. 1 and 2 focuses on D&D. Part B of Vols. 1 and 2 focuses on RA of contaminated facilities. Part C of Vols. 1 and 2 focuses on WM. Each part of Vol. 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the ranking os remedial technologies. Volume 2 (Pts. A, B, and C) contains the logic linkages among EM goals, environmental problems, and the various technologies that have the potential to solve these problems. Volume 3 (Pts. A, B, and C) contains the TLD data sheets. The focus of Vol. 1, Pt. B, is RA, and it has been divided into six chapters. The first chapter is an introduction, which defines problems specific to the ER Program for ORNL. Chapter 2 provides a general overview of the TLD. Chapters 3 through 5 are organized into necessary subelement categories: RA, characterization, and robotics and automation. The final chapter contains regulatory compliance information concerning RA.

  12. HAZWOPER project documents for demolition of the Waste Evaporator Facility, Building 3506, at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1996-03-01

    This document, in support of the Waste Evaporator Facility (WEF) demolition project and contains the Project Work Plan and the Project Health and Safety Plan for demolition and partial remediation actions by ATG at the Waste Evaporator Facility, Building 3506. Various activities will be conducted during the course of demolition, and this plan provides details on the work steps involved, the identification of hazards, and the health and safety practices necessary to mitigate these hazards. The objective of this document is to develop an approach for implementing demolition activities at the WEF. This approach is based on prior site characterization information and takes into account all of the known hazards at this facility. The Project Work Plan provides instructions and requirements for identified work steps that will be utilized during the performance of demolition, while the Health and Safety Plan addresses the radiological, hazardous material exposure, and industrial safety concerns that will be encountered.

  13. Technical safety requirements for the South Tank Farm remediation project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Platfoot, J.H.

    1999-01-01

    The South Tank Farm (STF) is a series of six, 170,000-gal underground, domed storage tanks that were placed into service in 1943. The tanks were constructed of a concrete mixture known as gunite. They were used as a portion of the Liquid LOW-LEVEL WASTE (LLW) System for the collection, neutralization, storage, and transfer of the aqueous portion of the radioactive and/or hazardous chemical wastes produced as part of normal facility operations at Oak Ridge National Laboratory (ORNL). Although the last of the tanks was taken out of service in 1986, they have been shown by structural analysis to continue to be structurally sound. An attempt was made in 1983 to empty the tanks; however, removal of all the sludge from the tanks was not possible with the equipment and schedule available. Since removal of the liquid waste in 1983, liquid continues to accumulate within the tanks. The in-leakage is believed to be the result of groundwater dripping into the tanks around penetrations in the domes. The tanks are currently being maintained under a Surveillance and Maintenance Program, which includes activities such as level monitoring, vegetation control, High Efficiency Particulate Air filter leakage requirement testing/replacement, sign erection/repair, pump-out of excess liquids, and instrument calibration/maintenance. A technique known as confined sluicing, which uses a high-pressure, low-volume water jet integrated with a jet pump, will be used to remove the sludge. The Technical Safety Requirements (TSRs) are those operational requirements that specify the operating limits and surveillance requirements, the basis thereof, safety boundaries, and the management of administrative controls necessary to ensure the safe operation of the STF remediation project. Effective implementation of TSRs will limit to acceptable levels the risks to the public and workers from uncontrolled releases of radioactive or other hazardous material.

  14. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 2, Revision 5

    SciTech Connect

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs.

  15. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-24

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the removal action project at the former YS-860 Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.

  16. Utah Character Education Action Research Projects.

    ERIC Educational Resources Information Center

    Utah State Office of Education, Salt Lake City.

    This booklet contains a synopsis of eight action research projects undertaken by educators from various Utah public schools presented at a series of workshops. Twenty-seven educators representing 19 schools, 9 school districts, and the Utah State Office of Education (USOE) attended the series of 4 full-day workshops held during October, February,…

  17. realfriends: A Student Social Action Project

    ERIC Educational Resources Information Center

    Van Zoost, Steven

    2012-01-01

    "realfriends" is a social action project created by Grade 12 English students in Windsor, Nova Scotia. Its purpose was to create a face-to-face social network that would help change the school climate into a more social space. Interest in socializing is nothing new for teenagers, but these students articulated a worry that people their…

  18. A Telecommunications-Infused Community Action Project.

    ERIC Educational Resources Information Center

    March, Thomas; Puma, Jessica

    1996-01-01

    The Nonprofit Prophets, a telecommunications-infused community action project, was designed for high school students. Students were teamed with a nonprofit organization and produced videoconferences or Web sites for them. Although specific skills were acquired, students also gained confidence and self-esteem as well as a belief that they…

  19. realfriends: A Student Social Action Project

    ERIC Educational Resources Information Center

    Van Zoost, Steven

    2012-01-01

    "realfriends" is a social action project created by Grade 12 English students in Windsor, Nova Scotia. Its purpose was to create a face-to-face social network that would help change the school climate into a more social space. Interest in socializing is nothing new for teenagers, but these students articulated a worry that people their…

  20. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    SciTech Connect

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  1. Data sharing report characterization of the surveillance and maintenance project miscellaneous process inventory waste items Oak Ridge National Laboratory, Oak Ridge, TN

    SciTech Connect

    Weaver, Phyllis C.

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, to provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a sampling and analysis campaign to target certain items associated with URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing for final disposal. This waste was generated during processing, surveillance, and maintenance activities associated with the facilities identified in the process knowledge (PK) provided in Appendix A. A list of items for sampling and analysis were generated from a subset of materials identified in the WHP populations (POPs) 4, 5, 6, 7, and 8, plus a small number of items not explicitly addressed by the WHP. Specifically, UCOR S&M project personnel identified 62 miscellaneous waste items that would require some level of evaluation to identify the appropriate pathway for disposal. These items are highly diverse, relative to origin; composition; physical description; contamination level; data requirements; and the presumed treatment, storage, and disposal facility (TSDF). Because of this diversity, ORAU developed a structured approach to address item-specific data requirements necessary for acceptance in a presumed TSDF that includes the Environmental Management Waste Management Facility (EMWMF)—using the approved Waste Lot (WL) 108.1 profile—the Y-12 Sanitary Landfill (SLF) if appropriate; Energy

  2. Any action? Reflections on the Australian Midwifery Action Project.

    PubMed

    Gray, Joanne E; Smith, Rachel M

    2017-06-01

    In 1997 a group of midwifery academics, researchers and practitioners met to discuss issues of concern related to the midwifery profession in Australia. It became clear from this discussion that midwifery in Australia was lagging behind similarly developed countries and that urgent action was required. From this meeting, a plan was developed to seek funding for a major national study into midwifery education and practice standards and as such, the Australian Midwifery Action Project (AMAP) was born. This discussion paper presents an overview of a number of midwifery education and regulation changes within the framework of the recommendations from the Australian Midwifery Action Project. A key question arising from this discussion is whether our current midwifery education and regulation standards provide a fit-for-purpose workforce that ensures all women and their families receive best practice midwifery care. Over the past 20 years the Midwifery profession in Australia has undergone significant changes and developments and these changes have had, and continue to have, significant impact on midwifery education and therefore on the quality of midwifery practice in Australia. Many changes have been implemented in the nearly 20 years since AMAP was first conceived. However, many of the issues that provided the impetus for a project such as AMAP remain and are still to be resolved. The midwifery profession continues to be subsumed with nursing, it is not possible to gain accurate midwifery workforce data and, despite the development of national standards for midwifery education, wide variations in courses still exist across Australia. Copyright © 2017 Australian College of Midwives. Published by Elsevier Ltd. All rights reserved.

  3. Dewatering equipment recommendations for the solids/liquid separation project at Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect

    Taylor, P.A.

    1992-05-01

    The final closure of Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory will include the plugging and abandonment of many existing wells and boreholes and the installation of diversion trenches for groundwater control. These activities will generate soil that must be dewatered before it can be disposed of. Three different types of dewatering equipment{emdash}rotary vacuum drum filters, automatic discharge pressure filters, and centrifuges{emdash}have been evaluated to assess their suitability for the WAG 6 project. Because of its lower cost and minimal prescreening requirements, it is recommended that a centrifuge be used to dewater the WAG 6 soils.

  4. Dewatering equipment recommendations for the solids/liquid separation project at Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Taylor, P.A.

    1992-05-01

    The final closure of Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory will include the plugging and abandonment of many existing wells and boreholes and the installation of diversion trenches for groundwater control. These activities will generate soil that must be dewatered before it can be disposed of. Three different types of dewatering equipment{emdash}rotary vacuum drum filters, automatic discharge pressure filters, and centrifuges{emdash}have been evaluated to assess their suitability for the WAG 6 project. Because of its lower cost and minimal prescreening requirements, it is recommended that a centrifuge be used to dewater the WAG 6 soils.

  5. Oaks and Environmental Education

    Treesearch

    Kay Antunez de Mayolo

    1991-01-01

    A number of educational projects which focus on youth awareness and involvement with California oaks have been developed during the last five years. Primarily used in urban areas where oak populations have declined, many of these programs promote seedling propagation, tree planting and help to develop student understanding of environmental issues involving oaks while...

  6. THE ACTION SPECTRUM FOR BREAKING DIAPAUSE IN THE CODLING MOTH, Laspeyresia pomonella (L.), AND THE OAK SILKWORM, Antheraea pernyi GUER.

    PubMed

    Norris, K H; Howell, F; Hayes, D K; Adler, V E; Sullivan, W N; Schechter, M S

    1969-08-01

    The action spectrum for breaking diapause in the oak silkworm, Antheraea pernyi Guer., and the codling moth, Laspeyresia pomonella (L.), was determined from 400 to 700 nm with a wedge-interference spectrograph. Insects were exposed to ten hours of white light, followed by six hours of spectral light each day for 45 days. The portion of the spectrum between 400 and 500 nm was found to be the most effective in terminating diapause. Diapause was broken for both insects with energy levels as low as 0.02 muw/cm(2).

  7. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-04-28

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the Lead Source Removal Project at the Former YS-86O Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. This plan covers the removal actions at the Former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification/confirmation sampling, grading and revegetation. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.

  8. Surveillance and maintenance report on decontamination and decommissioning and remedial action activities at the Oak Ridge Y-12 plant, Oak Ridge, Tennessee. Fiscal year 1996

    SciTech Connect

    King, H.L.; Sollenberger, M.L.; Sparkman, D.E.; Reynolds, R.M.; Wayland, G.S.

    1996-12-01

    The Oak Ridge Y-12 Plant Decontamination and Decommissioning (D&D) and Remedial Action (RA) programs are part of the Environmental Restoration (ER) Division and are funded by the Office of Environmental Management (EM-40). Building 9201-4 (known as Alpha-4), three sites located within Building 9201-3 (the Oil Storage Tank, the Molten Salt Reactor Experiment Fuel Handling Facility, and the Coolant Salt Technology Facility), and Building 9419-1 (the Decontamination Facility) are currently the facilities at the Y-12 Plant included in the D&D program. The RA program provides surveillance and maintenance (S&M) and program management of ER sites at the Y-12 Plant, including selected sites listed in Appendix C of the Federal Facilities Agreement (FFA), sites listed in the Hazardous and Solid Waste Amendment (HSWA) permit Solid Waste Management Unit (SWM-U) list, and sites currently closed or undergoing post-closure activities under the Resource Conservation and Recovery Act of 1976 (RCRA) or the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This report communicates the status of the program plans and specific S&M activities for the D&D and RA programs.

  9. Root cause analysis for waste area grouping 1, Batch I, Series 1 Tank T-30 project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1996-08-01

    Four inactive liquid low-level waste (LLLW) tanks were scheduled for remedial actions as the Batch L Series I Tank Project during fiscal year (FY) 1995. These tanks are 3001-B, 3004-B, T-30, and 3013. The initial tank remediation project was conducted as a maintenance action. One project objective was to gain experience in remediation efforts (under maintenance actions) to assist in conducting remedial action projects for the 33 remaining inactive LLLW tanks. Batch I, Series 1 project activities resulted in the successful remediation of tanks 3001-B, 3004-B, and 3013. Tank T-30 remedial actions were halted as a result of information obtained during waste characterization activities. The conditions discovered on tank T-30 would not allow completion of tank removal and smelting as originally planned. A decision was made to conduct a root cause analysis of Tank T-30 events to identify and, where possible, correct weaknesses that, if uncorrected, could result in similar delays for completion of future inactive tank remediation projects. The objective of the analysis was to determine why a portion of expected project end results for Tank T-30 were not fully achieved. The root cause analysis evaluates project events and recommends beneficial improvements for application to future projects. This report presents the results of the Batch I, Series root cause analysis results and makes recommendations based on that analysis.

  10. Projected changes in the future distribution and production of sessile oak forests near the xeric limit

    NASA Astrophysics Data System (ADS)

    Gulyás, Krisztina; Berki, Imre; Veperdi, Gábor

    2017-04-01

    As a result of regional climate change, most European countries are experiencing an increase in mean annual temperature and CO2 concentration and a decrease in mean annual precipitation. In low-elevation areas in Southeast Europe, where precipitation is a limiting factor, the projected climate change threatens the health, production, and potential distribution of forest ecosystems. The intensive summer droughts and commonly occurring extreme weather events create negative influences that cause health declines, changes in yield potential, and tree mortality. Due to the observed damages, attention has been focused on these problems. The impacts of climatic extremes cause difficulties in forest management; these difficulties occur more frequently in Hungary, which is a region that is the most sensitive to climatic extremes. Regional climate model simulations project that the frequency of extremely high temperatures and long-term dry periods will increase; both of these factors have negative effects on future tree species distribution and production. Thus, the aim of our study is to utilize the sessile oak (Quercus petraea) as a climate indicator tree species to investigate potential future distribution and estimate changes in growth trends. For future spatial distribution, we used the Fuzzy membership distribution model in a new Decision Support System (DSS) which was developed for the Hungarian forestry and agricultural sectors. Through study techniques we can employ DSS, which contains various environmental layers (topography, vegetation, past and projected future climate, soils, and hydrology), to create probability distribution maps. The results, based on 12 regional climate model simulations (www.ensembles-eu.org), show that the area of sessile oak forests is shrinking continuously and will continue to do so to the end of the 21st century. For future production estimations, we analysed intensive long-term growth monitoring network plots that were established in

  11. Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA project

    SciTech Connect

    Not Available

    1989-09-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

  12. Comparison of FVS projection of oak decline on the Mark Twain National Forest to actual growth and mortality as measured over three FIA inventory cycles

    Treesearch

    Don Vandendriesche; Linda Haugen

    2008-01-01

    Oak decline has been recorded on oak forests throughout the Ozark Plateau of Missouri since the 1970s, but severe drought in the late 1990s, combined with the advancing age of the Ozark forests, has intensified the levels of crown dieback and mortality beyond historical levels. The purpose of this project was to determine whether the Forest Vegetation Simulator (FVS)...

  13. Bear Creek Valley Floodplain hot spot removal early action characterization field data summary report, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-04-01

    This report summarizes the field and laboratory efforts as a result of the Bear Creek Floodplain Hot Spot Removal Project Early Action. The purpose of this project was to collect data necessary to assess contaminant levels in the Bear Creek Valley Floodplain and evaluate the risk posed by the sites. This report provides information on the background of the site, characterization of site and field activities, results of field and laboratory data collected, extent and distribution of contamination, and an assessment of the future risk posed by the site.

  14. Health and safety plan for the Molten Salt Reactor Experiment remediation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Burman, S.N.; Uziel, M.S.

    1995-12-01

    The Lockheed Martin Energy Systems, Inc., (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of the policy requires that operations at the Molten Salt Reactor Experiment (MSRE) facility at the Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) are guided by an overall plan and consistent proactive approach to safety and health (S and H) issues. The policy and procedures in this plan apply to all MSRE operations. The provisions of this plan are to be carried out whenever activities are initiated at the MSRE that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and the best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air.

  15. Decontamination Project for Cell G of the Metal Recovery Facility at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Mandry, G.J.; Grisham, R.W.

    1994-02-01

    The goal of the decontamination effort in Cell G at the Metal Recovery Facility, Building 3505, located at the Oak Ridge National Laboratory, was two-fold: to determine the effectiveness of the dry decontamination technique employed and to provide data required to assess whether additional decontamination using this method would be beneficial in the eventual decommissioning of the facility. Allied Technology Group (ATG) was contracted to remove a portion of the concrete surface in Cell G by a technique known as scabbling. Some metallic cell components were also scabbled to remove paint and other surface debris. Generally, the scabbling operation was a success. Levels of contamination were greatly reduced. The depth of contaminant penetration into the concrete surfaces of certain areas was much greater than had been anticipated, necessitating the removal of additional concrete and extending ATG`s period of performance. Scabbling and other related techniques will be extremely useful in the decontamination and decommissioning of other nuclear facilities with similar radiological profiles.

  16. Project health and safety plan for the Gunite and Associated Tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Abston, J.P.

    1997-04-01

    The Lockheed Martin Energy Systems, Inc. (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at the Gunite and Associated Tanks (GAAT) in the North and South Tank Farms (NTF and STF) at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to health and safety (H and S) issues. The policy and procedures in this plan apply to all GAAT operations in the NTF and STF. The provisions of this plan are to be carried out whenever activities identifies s part of the GAAT are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices in order to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air. This plan explains additional task-specific health and safety requirements such as the Site Safety and health Addendum and Activity Hazard Analysis, which should be used in concert with this plan and existing established procedures.

  17. Annual report of decommissioning and remedial action S&M activities for the Environmental Management Program at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1997-11-01

    The Oak Ridge National Laboratory (ORNL) Surveillance and Maintenance (S&M) Program performs a variety of activities to ensure that sites and facilities within its responsibility remain in a safe condition and in compliance with applicable regulations. All S&M Program activities during fiscal year (FY) 1997 were accomplished safely, with no health and safety incidents, no lost work days, and no environmental noncompliances. In addition, all activities were performed within schedule thresholds and under budget. Many remedial action (RA) sites and decontamination and decommissioning (D&D) facilities are inspected and maintained by the S&M Program. RA sites encompass approximately 650 acres and 33 D&D facilities, including 4 inactive reactors. During FY 1997, routine, preventative, and emergency maintenance activities were performed as needed at these sites and facilities. Stabilization activities were also performed to reduce risks and reduce future S&M costs. Major activities at the RA sites during FY 1997 included maintaining proper liquid levels in surface impoundments and inactive -liquid low-level waste storage tanks as well as installing a new cover at the tumulus pads in Waste Area Grouping (WAG) 6, planting trees in the First Creek Riparian Corridor, and performing over 900 well inspections. Postremediation monitoring was conducted at the 3001 Canal, Core Hole 8, the WAG 6 Resource Conservation and Recovery caps, and WAG 5 Seeps C and D; groundwater monitoring was performed in WAGs 4, 5, and 6 and at the 3001 Canal Well. At ORNL D&D facilities, significant accomplishments included contaminated lead brick removal, asbestos abatement, contaminated equipment and debris removal, and radiologically contaminated area painting.

  18. Work plan for support to Upper East Fork Poplar Creek east end VOC plumes well installation project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    Under the Resource Conservation and Recovery Act of 1976 guidelines and requirements from the Tennessee Department of Environment and Conservation (TDEC), the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire Oak Ridge Reservation (ORR) was placed on the National Priorities List of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) sites in November 1989. Following CERCLA guidelines, sites within the ORR require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) or an engineering evaluation/cost analysis (EE/CA) of potential remedial actions. Data from monitoring wells at the east end of the Y-12 Plant have identified an area of groundwater contamination dominated by the volatile organic compound (VOC) carbon tetrachloride; other VOCs include chloroform, tetrachloroethene, and trichloroethene.

  19. Health and safety plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1996-08-01

    This HASP describes the process for identifying the requirements, written safety documentation, and procedures for protecting personnel involved in the Isotopes Facilities Deactivation Project. Objective of this project is to place 19 former isotope production facilities at ORNL in a safe condition in anticipation of an extended period of minimum surveillance and maintenance.

  20. Volatile organic compound remedial action project

    SciTech Connect

    1991-12-01

    This Environmental Assessment (EA) reviews a proposed project that is planned to reduce the levels of volatile organic compound (VOC) contaminants present in the Mound domestic water supply. The potable and industrial process water supply for Mound is presently obtained from a shallow aquifer via on-site production wells. The present levels of VOCs in the water supply drawn from the on-site wells are below the maximum contaminant levels (MCLs) permissible for drinking water under Safe Drinking Water Act (SDWA; 40 CFR 141); however, Mound has determined that remedial measures should be taken to further reduce the VOC levels. The proposed project action is the reduction of the VOC levels in the water supply using packed tower aeration (PTA). This document is intended to satisfy the requirements of the National Environmental Policy Act (NEPA) of 1969 and associated Council on Environmental Quality regulations (40 CFR parts 1500 through 1508) as implemented through U.S. Department of Energy (DOE) Order 5440.1D and supporting DOE NEPA Guidelines (52 FR 47662), as amended (54 FR 12474; 55 FR 37174), and as modified by the Secretary of Energy Notice (SEN) 15-90 and associated guidance. As required, this EA provides sufficient information on the probable environmental impacts of the proposed action and alternatives to support a DOE decision either to prepare an Environmental Impact Statement (EIS) or issue a Finding of No Significant Impact (FONSI).

  1. Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1996-09-01

    The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

  2. Lipid complexes with cationic peptides and OAKs; their role in antimicrobial action and in the delivery of antimicrobial agents.

    PubMed

    Epand, Raquel F; Mor, Amram; Epand, Richard M

    2011-07-01

    Antimicrobial agents are toxic to bacteria by a variety of mechanisms. One mechanism that is very dependent on the lipid composition of the bacterial membrane is the clustering of anionic lipid by cationic antimicrobial agents. Certain species of oligo-acyl-lysine (OAK) antimicrobial agents are particularly effective in clustering anionic lipids in mixtures mimicking the composition of bacterial membranes. The clustering of anionic lipids by certain cationic antimicrobial agents contributes to the anti-bacterial action of these agents. Bacterial membrane lipids are a determining factor, resulting in some species of bacteria being more susceptible than others. In addition, lipids can be used to increase the effectiveness of antimicrobial agents when administered in vivo. Therefore, we review some of the structures in which lipid mixtures can assemble, to more effectively be utilized as antimicrobial delivery systems. We describe in more detail the complexes formed between mixtures of lipids mimicking bacterial membranes and an OAK and their usefulness in synergizing with antibiotics to overcome bacterial multidrug resistance.

  3. Mitigation Action Plan: Lease of Parcel ED-1 of the Oak Ridge Reservation by the East Tennessee Economic Council

    SciTech Connect

    1996-04-01

    In April 1996, the U.S. Department of Energy (DOE) completed an environmental assessment (EA) (DOE/EA-1113) for the proposed lease of 957-16 acres (Parcel ED-1) of the Oak Ridge (Tennessee) Reservation (ORR) by the East Tennessee Economic Council (ETEC) for industrial development. DOE plans to issue a Finding of No Significant Impact (FONSI) for the proposed action, conditional upon the implementation of mitigation and monitoring to protect environmental resources. According to DOE`s National Environmental Policy Act (NEPA) regulations (10 CFR 1021.322), a FONSI shall include {open_quotes}any commitments to mitigations that are essential to render the impacts of the proposed action not significant, beyond those mitigations that are integral elements of the proposed action, and a reference to the Mitigation Action Plan prepared under 10 CTR 1021.331{close_quotes}. Terms of the lease offer DOE the option of terminating the lease with ETEC should the lessee and/or sublessees fail to implement the mitigation defined in the FONSI.

  4. Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect

    Bechtel Jacobs

    2011-02-01

    Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) from unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from 1945 until 1985

  5. Validation procedures used in the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect

    Not Available

    1993-12-01

    The purpose of this report is (1) to document the data validation process developed for the Background Soil Characterization Project (BSCP); (2) to offer members of other project teams and potential data users the benefit of the experience gained in the BSCP in the area of developing project-specific data validation criteria and procedures based on best available guidance and technical information; and (3) to provide input and guidance to the efforts under way within Martin Marietta Energy Systems, Inc., to develop standard operating procedures to streamline and optimize the analytical laboratory data validation process for general use by making it more technically rigorous, consistent, and cost effective. Lessons learned from the BSCP are also provided to meet this end (Sect. 1.3).

  6. ALARA plan for the Old Hydrofracture Facility tanks contents removal project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1998-04-01

    The purpose of the Old Hydrofracture Facility (OHF) Tanks Contents Removal Project is to remove the liquid low-level waste from the five underground storage tanks located at OHF and transfer the resulting slurry to the Melton Valley Storage Tanks facility for treatment and disposal. Among the technical objectives for the OHF Project, there is a specific provision to maintain personnel exposures as low as reasonably achievable (ALARA) during each activity of the project and to protect human health and the environment. The estimated doses and anticipated conditions for accomplishing this project are such that an ALARA Plan is necessary to facilitate formal radiological review of the campaign. This ALARA Plan describes the operational steps necessary for accomplishing the job together with the associated radiological impacts and planned controls. Individual and collective dose estimates are also provided for the various tasks. Any significant changes to this plan (i.e., planned exposures that are greater than 10% of original dose estimates) will require formal revision and concurrence from all parties listed on the approval page. Deviations from this plan (i.e., work outside the scope covered by this plan) also require the preparation of a task-specific ALARA Review that will be amended to this plan with concurrence from all parties listed on the approval page.

  7. The Action-Project Method in Counseling Psychology

    ERIC Educational Resources Information Center

    Young, Richard A.; Valach, Ladislav; Domene, Jose F.

    2005-01-01

    The qualitative action-project method is described as an appropriate and heuristic qualitative research method for use in counseling psychology. Action theory, which addresses human intentional, goal-directed action, project, and career, provides the conceptual framework for the method. Data gathering and analysis involve multiple procedures to…

  8. The Action-Project Method in Counseling Psychology

    ERIC Educational Resources Information Center

    Young, Richard A.; Valach, Ladislav; Domene, Jose F.

    2005-01-01

    The qualitative action-project method is described as an appropriate and heuristic qualitative research method for use in counseling psychology. Action theory, which addresses human intentional, goal-directed action, project, and career, provides the conceptual framework for the method. Data gathering and analysis involve multiple procedures to…

  9. Final report on the Background Soil Characterization Project at the Oak Ridge Reservation, Oak Ridge, Tennessee. Volume 1: Results of Field Sampling Program

    SciTech Connect

    Watkins, D.R.; Ammons, J.T.; Branson, J.L.

    1993-10-01

    This report presents, evaluates, and documents data and results obtained in the Background Soil Characterization Project (BSCP). It is intended to be a stand-alone document for application and use in structuring and conducting remedial investigation and remedial action projects in the Environmental Restoration (ER) Program. The objectives of the BSCP consist of the following: determine background concentrations of organics, metals, and radionuclides in natural soils that are key to environmental restoration projects; provide remediation projects with 100% validated data on background concentrations, which are technically and legally defensible; and quantify baseline risks from background constituents for comparison of risks associated with contaminated sites.

  10. Community Action Projects: Applying Biotechnology in the Real World

    ERIC Educational Resources Information Center

    Nguyen, Phuong D.; Siegel, Marcelle A.

    2015-01-01

    Project-based learning and action research are powerful pedagogies in improving science education. We implemented a semester-long course using project-based action research to help students apply biotechnology knowledge learned in the classroom to the real world. Students had several choices to make in the project: working individually or as a…

  11. Community Action Projects: Applying Biotechnology in the Real World

    ERIC Educational Resources Information Center

    Nguyen, Phuong D.; Siegel, Marcelle A.

    2015-01-01

    Project-based learning and action research are powerful pedagogies in improving science education. We implemented a semester-long course using project-based action research to help students apply biotechnology knowledge learned in the classroom to the real world. Students had several choices to make in the project: working individually or as a…

  12. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  13. Oak Ridge National Laboratory Technology Logic Diagram. Volume 3, Technology evaluation data sheets: Part B, Dismantlement, Remedial action

    SciTech Connect

    Not Available

    1993-09-01

    The Oak Ridge National Laboratory Technology Logic Diagram (TLD) was developed to provide a decision support tool that relates environmental restoration (ER) and waste management (WM) problems at Oak Ridge National Laboratory (ORNL) to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration testing, and evaluation needed to develop these technologies to a state that allows technology transfer and application to decontamination and decommissioning (D&D), remedial action (RA), and WM activities. The TLD consists of three fundamentally separate volumes: Vol. 1, Technology Evaluation; Vol. 2, Technology Logic Diagram and Vol. 3, Technology EvaLuation Data Sheets. Part A of Vols. 1 and 2 focuses on RA. Part B of Vols. 1 and 2 focuses on the D&D of contaminated facilities. Part C of Vols. 1 and 2 focuses on WM. Each part of Vol. 1 contains an overview of the TM, an explanation of the problems facing the volume-specific program, a review of identified technologies, and rankings of technologies applicable to the site. Volume 2 (Pts. A. B. and C) contains the logic linkages among EM goals, environmental problems, and the various technologies that have the potential to solve these problems. Volume 3 (Pts. A. B, and C) contains the TLD data sheets. This volume provides the technology evaluation data sheets (TEDS) for ER/WM activities (D&D, RA and WM) that are referenced by a TEDS code number in Vol. 2 of the TLD. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than is given for the technologies in Vol. 2.

  14. Oak Decline

    Treesearch

    Philip M. Wargo; David R. Houston; Leon A. LaMadeleine

    1983-01-01

    Periodic occurrences of decline and death of oaks over widespread areas have been recorded since 1900. These outbreaks, variously named oak decline, oak dieback, or oak mortality, are caused by a complex interaction of environmental stresses and pests and given the name oak decline.

  15. Phased Construction Completion Report for Bldg. K-1401 of the Remaining Facilities Demolition Project at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect

    Bechtel Jacobs

    2008-10-01

    This Phased Construction Completion Report documents the demolition of Bldg. K-1401, Maintenance Building, addressed in the Action Memorandum for the Remaining Facilities Demolition Project at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2003a) as a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 non-time-critical removal action. The objectives of the removal action (DOE 2003a) - to eliminate the source of potential contamination, to eliminate the threat of potential future releases, and/or to eliminate the threats to the general public and the environment - were met. The end state of this action is for the slab to remain with all penetrations sealed and grouted or backfilled. The basement and pits remain open. There is residual radiological and polychlorinated biphenyl contamination on the slab and basement. A fixative was applied to the area on the pad contaminated with polychlorinated biphenyls. Interim land-use controls will be maintained until final remediation decisions are made under the Zone 2 Record of Decision (DOE 2005a).

  16. Phased Construction Completion Report for Building K-1401 of the Remaining Facilities Demolition Project at the East Tennessee Technology Park Oak Ridge, Tennessee

    SciTech Connect

    Garland S.

    2008-03-01

    This Phased Construction Completion Report documents the demolition of Bldg. K-1401, Maintenance Building, addressed in the Action Memorandum for the Remaining Facilities Demolition Project at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2003a) as a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 non-time-critical removal action. The objectives of the removal action (DOE 2003a) - to eliminate the source of potential contamination, to eliminate the threat of potential future releases, and/or to eliminate the threats to the general public and the environment - were met. The end state of this action is for the slab to remain with all penetrations sealed and grouted or backfilled. The basement and pits remain open. There is residual radiological and polychlorinated biphenyl contamination on the slab and basement. A fixative was applied to the area on the pad contaminated with polychlorinated biphenyls. Interim land-use controls will be maintained until final remediation decisions are made under the Zone 2 Record of Decision (DOE 2005a).

  17. An Action-Research Project: Community Lead Poisoning Prevention

    ERIC Educational Resources Information Center

    Rajaram, Shireen S.

    2007-01-01

    This action-research project focused on gathering data on awareness of lead poisoning, as well as disseminating information on lead poisoning prevention in a metropolitan midwestern city. This project reflects an action-research approach to service learning and was in collaboration with a grass-roots organization. This paper outlines the daunting…

  18. Developing Counseling Students' Multicultural Competence through the Multicultural Action Project

    ERIC Educational Resources Information Center

    Hipolito-Delgado, Carlos P.; Cook, Jennifer M.; Avrus, Elaine M.; Bonham, Erica J.

    2011-01-01

    The Multicultural Action Project (MAP) is a cultural immersion project that requires counseling students to engage with diverse cultural communities on 3 levels: observation, information seeking, and action. To ascertain if participating in MAP improved the multicultural competence of graduate counseling students, the authors conducted an…

  19. Oak Ridge National Laboratory Gunite and Associated Tanks Stabilization Project-Low-Tech Approach with High-Tech Results

    SciTech Connect

    Brill, A.; Alsup, T.; Bolling, D.

    2002-02-26

    Environmental restoration of the Gunite and Associated Tanks (GAAT) at the Oak Ridge National Laboratory (ORNL) was a priority to the U. S. Department of Energy (DOE) because of their age and deteriorating structure. These eight tanks ranging up to 170,000 gallons in capacity were constructed in 1943 of a Gunite or ''sprayed concrete material'' as part of the Manhattan Project. The tanks initially received highly radioactive waste from the Graphite Reactor and associated chemical processing facilities. The waste was temporarily stored in these tanks to allow for radioactive decay prior to dilution and release into surface waters. Over time, additional wastes from ongoing ORNL operations (e.g., isotope separation and materials research) were discharged to the tanks for storage and treatment. These tanks were taken out of service in the 1970s. Based on the structure integrity of GAAT evaluated in 1995, the worst-case scenario for the tanks, even assuming they are in good condition, is to remain empty. A recently completed interim action conducted from April 1997 through September 2000 removed the tank liquids and residual solids to the extent practical. Interior video surveys of the tanks indicated signs of degradation of the Gunite material. The tanks continued to receive inleakage, which generated a relatively high volume waste stream that required periodic removal, treatment, and disposal. For these reasons, DOE chose in-place stabilization of Tanks W-3 through W-10 as a non-timecritical removal action under Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Tank stabilization activities involved removal of liquid from inleakage and placement of a grout mixture or ''flowable fill'' into the tanks to within 3-ft of the ground surface. Bechtel Jacobs Company, LLC (BJC) awarded Safety and Ecology Corporation (SEC) a subcontract in March 2001 to complete the documentation and fieldwork necessary to achieve tank stabilization in

  20. Maintenance Action Work Plan for Waste Area Grouping 1 inactive tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect

    1995-07-01

    This Maintenance Action Work Plan has been prepared to document the activities and procedures for the remediation of four inactive, low-level radioactive tanks at Waste Area Grouping 1, from the Category D list of tanks in the Federal Facility Agreement for the Oak Ridge Reservation (EPA et al. 1994). The four tanks to remediated are tanks 3001-B, 3004-B, T-30, and 3013. Three of the tanks (3001-B, 3004-B, and T-30) will be physically removed from the ground. Because of logistical issues associted with excavation and site access, the fourth tank (3013) will be grouted in place and permanently closed.

  1. Arsenic Removal from Drinking Water by Adsorptive Media. U.S. EPA Demonstration Project at Oak Manor Municipal Utility District at Alvin, TX. Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the EPA arsenic removal technology demonstration project at the Oak Manor Municipal Utility District (MUD) facility in Alvin, TX. The objectives of the project were to evaluate 1) the effectiveness of a ...

  2. Arsenic Removal from Drinking Water by Adsorptive Media. U.S. EPA Demonstration Project at Oak Manor Municipal Utility District at Alvin, TX. Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the EPA arsenic removal technology demonstration project at the Oak Manor Municipal Utility District (MUD) facility in Alvin, TX. The objectives of the project were to evaluate 1) the effectiveness of a ...

  3. Proceedings of Management Workshop for Alcohol Safety Action Project Leaders.

    ERIC Educational Resources Information Center

    Human Resources Research Organization, Alexandria, VA.

    The workshop for Alcohol Safety Action Project administrators was held to help prepare project directors in the management of their projects and to identify their responsibilities and job tasks. It was also attended by National Highway Traffic Safety Administration (NHTSA) representatives to help in the orientation of the ASAP program. The full…

  4. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  5. Project management plan for Waste Area Grouping 5 Old Hydrofracture Facility tanks contents removal at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1998-02-01

    This revision (Rev. 1) updates the schedule and designation of responsibilities for the Old Hydrofracture Facility (OHF) tanks contents removal project. Ongoing and planned future activities include: cold testing of the sluicing and pumping system; readiness assessment; equipment relocation and assembly; isotopic dilution of fissile radionuclides; sluicing and transfer of the tanks contents; and preparation of the Removal Action Completion Report. The most significant change is that the sluicing and pumping system has been configured by and will be operated by CDM Federal Programs Corporation. In addition, a new technical lead and a new project analyst have been designated within Lockheed Martin Energy Systems, Inc. and Lockheed Martin Energy Research Corp. The schedule for tanks contents removal has been accelerated, with transfer of the final batch of tank slurry now scheduled for March 31, 1998 (instead of November 10, 1998). The OHF sluicing and pumping project is proceeding as a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act. The purpose of the project is to remove the contents from five inactive underground storage tanks, designated T-1, T-2, T-3, T-4, and T-9. The tanks contain an estimated 52,700 gal of liquid and sludge, together comprising a radioactive inventory of approximately 30,000 Ci.

  6. Oak wilt

    Treesearch

    Robert, Jr. Lewis

    1989-01-01

    Oak wilt, a major disease of oak trees in North America, is caused by a fungus. It infects the sapwood and stops sap flow to the branches, twigs, and leaves. When sap flow is restricted during the growing season, trees wilt and soon die. In addition to killing trees, oak wilt makes it more difficult to export oak logs to other countries. Logs must be free of oak wilt...

  7. The James Bay Project: Reaction or Action?

    ERIC Educational Resources Information Center

    Mackwood, Gae

    1991-01-01

    Discusses the plan to restructure northern Quebec's landscape through the James Bay hydroelectric project. Suggests that the project offers opportunities to study development versus preservation, federal versus provincial powers, and the conflict between business and Native communities. Explores the need to teach students to care about social…

  8. The James Bay Project: Reaction or Action?

    ERIC Educational Resources Information Center

    Mackwood, Gae

    1991-01-01

    Discusses the plan to restructure northern Quebec's landscape through the James Bay hydroelectric project. Suggests that the project offers opportunities to study development versus preservation, federal versus provincial powers, and the conflict between business and Native communities. Explores the need to teach students to care about social…

  9. Confirmatory radiological survey of the Grand Junction Projects Office Remedial Action Project exterior portions, 1989-1995

    SciTech Connect

    Forbes, G.H.; Egidi, P.V.

    1997-04-01

    The purpose of this independent assessment was to provide the U.S. Department of Energy (DOE) with an independent verification (IV) that the soil at the Grand Junction Projects Office (GJPO) complies with applicable DOE guidelines. Oak Ridge National Laboratory/ Environmental Technology Section (ORNL/ETS) which is also located at the GJPO, was assigned by DOE as the Independent Verification Contractor (IVC). The assessment included reviews of the decontamination and decommissioning plan, annual environmental monitoring reports, data in the pre- and post-remedial action reports, reassessment reports and IV surveys. Procedures and field methods used during the remediation were reviewed, commented on, and amended as needed. The IV surveys included beta-gamma and gamma radiation scans, soil sampling and analyses. Based on the data presented in the post-remedial action report and the results of the IV surveys, the remediation of the outdoor portions of the GJPO has achieved the objectives. Residual deposits of uranium contamination may exist under asphalt because the original characterization was not designed to identify uranium and subsequent investigations were limited. The IVC recommends that this be addressed with the additional remediation. The IVC is working with the remedial action contractor (RAC) to assure that final documentation WM be sufficient for certification. The IVC will address additional remediation of buildings, associated utilities, and groundwater in separate reports. Therefore, this is considered a partial verification.

  10. Radiological survey activities: uranium mill tailings remedial action project procedures manual

    SciTech Connect

    Little, C.A.; Berven, B.A.; Carter, T.E.; Espegren, M.L.; O'Donnell, F.R.; Ramos, S.J.; Retolaza, C.D.; Rood, A.S.; Santos, F.A.; Witt, D.A.

    1986-07-01

    The US Department of Energy (DOE) was assigned the responsibility for conducting remedial action at 24 sites, which are located in one eastern and nine western states. The DOE's responsibilities are being met through its Uranium Mill Tailings Remedial Action Project Office (UMTRA-PO) in Albuquerque, New Mexico. The purpose of this Procedures Manual is to provide a standardized set of procedures that document in an auditable manner the activities performed by the Radiological Survey Activities (RASA) group in the Dosimetry and Biophysical Transport Section (DABTS) of the Health and Safety Research Division (HASRD) at the Oak Ridge National Laboratory (ORNL), in its role as the Inclusion Survey Contractor (ISC). Members of the RASA group assigned to the UMTRA Project are headquartered in the ORNL/RASA office in Grand Junction, Colorado, and report to the ORNL/RASA Project Manager. The Procedures Manual ensures that the organizational, administrative, and technical activities of the RASA/UMTRA group conform properly to those of the ISC as described in the Vicinity Properties Management and Implementation Manual and the Summary Protocol. This manual also ensures that the techniques and procedures used by the RASA/UMTRA group and contractor personnel meet the requirements of applicable governmental, scientific, and industrial standards.

  11. Indigenizing Teacher Education: An Action Research Project

    ERIC Educational Resources Information Center

    Kitchen, Julian; Raynor, Marg

    2013-01-01

    This action research report focuses on a new elective course entitled "Indigenizing Education: Education for/about Aboriginal Peoples" that was developed and taught by two teacher educators--one Euro-Canadian and the other Metis. The purpose of the course was to increase understanding of Indigenous peoples and of the impact of…

  12. Indigenizing Teacher Education: An Action Research Project

    ERIC Educational Resources Information Center

    Kitchen, Julian; Raynor, Marg

    2013-01-01

    This action research report focuses on a new elective course entitled "Indigenizing Education: Education for/about Aboriginal Peoples" that was developed and taught by two teacher educators--one Euro-Canadian and the other Metis. The purpose of the course was to increase understanding of Indigenous peoples and of the impact of…

  13. Superfund Record of Decision (EPA Region 5): Oak Grove Sanitary Landfill, Anoka County, MN. (Second remedial action), December 1990. Final report

    SciTech Connect

    Not Available

    1990-12-21

    The 45-acre Oak Grove Sanitary Landfill is a former municipal and industrial solid waste landfill in Oak Grove Township, Anoka County, Minnesota. A 1988 Record of Decision (ROD) addressed the sources of contamination by containing the onsite waste and contaminated soil with a cover. EPA investigations in 1989 determined that the contaminated shallow aquifer discharges directly to the surface water of the adjoining wetlands where ground water contamination is being reduced by natural attenuation, and thus, limiting migration of contaminants to the surface water. The selected remedial action for the site includes long term monitoring of the shallow and deep aquifers, surface water, and sediment at a frequency of three times per year for the first year and semi-annually thereafter; natural attenuation of shallow ground water; abandoning non-essential wells; and implementing institutional controls including ground water use restrictions.

  14. K-311-1/K-310-3 Purge Cascade Process Description, Oak Ridge Environmental Management Accelerated Cleanup Project, Oak Ridge, Tennessee

    SciTech Connect

    Shoemaker J.E.

    2009-05-13

    stream of UF6 then passed from K-311-1 into the upstream cells in K-25. In-leakage of light gases in the K-25 Building continued to be removed by the K-312 Purge Facilities. K-311-1 operated as a Side Purge Cascade from 1954 until the K-25 Building was shut down in 1964; at that time K-311-1 became the Oak Ridge Gaseous Diffusion Plant (ORGDP) Top (and only) Purge Cascade. The adjacent K-310-3 Unit was operated along with K-311-1 as the top purge cascade and K-310-2 was also operated at times to supplement cells in the K311-1/K-310-3 Purge Cascade. K-311-1 was shut down on February 14, 1977, after the newer, larger capacity K-402-9 Purge Cascade was placed in operation. K-310-3 continued to operate until the K-402-8 Coolant Removal Unit was placed in service, and K-310-3 was shut down on March 14, 1978. Since the K-311-1 and K-310-3 units continued to operate after K-25 shutdown, removal of equipment such as valves and piping for other projects did not occur in this area. As a result, these two units have not been exposed to atmospheric wet air over the years as much of the remainder of K-25 has been exposed. Any deposits or residual gases contained in K-311-1 or K-310-3 are not likely to be fully hydrolyzed.

  15. Data sharing report characterization of population 7: Personal protective equipment, dry active waste, and miscellaneous debris, surveillance and maintenance project Oak Ridge National Laboratory Oak Ridge, Tennessee

    SciTech Connect

    Harpenau, Evan M.

    2013-10-10

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested that ORAU plan and implement a sampling and analysis campaign targeting certain URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing to determine a final pathway for disposal. Population 7 (POP 7) consists of 56 containers of aged, low-level and potentially mixed S&M waste that has been staged in various locations around ORNL. Several of these POP 7 containers primarily contain personal protective equipment (PPE) and dry active waste (DAW), but may contain other miscellaneous debris. This data sharing report addresses the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) specified waste in a 13-container subpopulation (including eight steel boxes, three 55-gal drums, one sealand, and one intermodal) that lacked sufficient characterization data for possible disposal at the Environmental Management Waste Management Facility (EMWMF) using the approved Waste Lot (WL) 108.1 profile.

  16. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... and classification of United States lands as water power sites and other actions under section 24...

  17. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... and classification of United States lands as water power sites and other actions under section 24...

  18. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... and classification of United States lands as water power sites and other actions under section 24...

  19. Culminating Experience Action Research Projects, Volume 2, Fall 2002.

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Moyer, Peggy S., Ed.

    As part of the graduate teacher licensure program at the University of Tennessee at Chattanooga, candidates are required to complete an action research project during a course that coincides with the student teaching experience. The syllabus for the course, "Education 590 Culminating Experience," is included, followed by action research projects…

  20. Participatory Evaluation with Youth Leads to Community Action Project

    ERIC Educational Resources Information Center

    Ashton, Carolyn; Arnold, Mary E.; Wells, Elissa E.

    2010-01-01

    4-H has long emphasized the importance of civic engagement and community service for positive youth development. One pathway to this ideal is youth action research and evaluation. This article demonstrates how participatory youth research and evaluation can lead to the successful implementation of community action projects. It describes the…

  1. Project WILD--From Awareness to Action!

    ERIC Educational Resources Information Center

    Charles, Cheryl; Schafer, Rudy

    1984-01-01

    Discusses goals of Project WILD, an environmental and conservation program emphasizing wildlife. Includes instructions for using and sample of "dilemma cards" which allow students to read, discuss, make judgments, and write about hypothetical dilemmas concerning wildlife and/or natural resources. (BC)

  2. Project WILD--From Awareness to Action!

    ERIC Educational Resources Information Center

    Charles, Cheryl; Schafer, Rudy

    1984-01-01

    Discusses goals of Project WILD, an environmental and conservation program emphasizing wildlife. Includes instructions for using and sample of "dilemma cards" which allow students to read, discuss, make judgments, and write about hypothetical dilemmas concerning wildlife and/or natural resources. (BC)

  3. Project InterActions: A Multigenerational Robotic Learning Environment

    ERIC Educational Resources Information Center

    Bers, Marina U.

    2007-01-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both…

  4. The Biodiversity Community Action Project: An STS Investigation

    ERIC Educational Resources Information Center

    Aidin, Amirshokoohi; Mahsa, Kazempour

    2010-01-01

    The Biodiversity Community Action Project is a stimulating and vigorous project that allows students to gain an in-depth understanding of the interconnection between organisms and their environments as well as the connection of science to their lives and society. It addresses key content standards in the National Science Education Standards and…

  5. The Biodiversity Community Action Project: An STS Investigation

    ERIC Educational Resources Information Center

    Aidin, Amirshokoohi; Mahsa, Kazempour

    2010-01-01

    The Biodiversity Community Action Project is a stimulating and vigorous project that allows students to gain an in-depth understanding of the interconnection between organisms and their environments as well as the connection of science to their lives and society. It addresses key content standards in the National Science Education Standards and…

  6. Literacy Learning within Community Action Projects for Social Change

    ERIC Educational Resources Information Center

    Wright, Dana E.; Mahiri, Jabari

    2012-01-01

    This case study describes the literacy development of a struggling reader over a seven-month period as he engaged in a youth-led participatory action research (PAR) project. The project's goal was for youth participants to develop a proposal for productive change in their local community and present it to community stakeholders. The study focused…

  7. Project InterActions: A Multigenerational Robotic Learning Environment

    ERIC Educational Resources Information Center

    Bers, Marina U.

    2007-01-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both…

  8. Is Action Research Necessarily Collaborative? Changing Mutuality within a Project

    ERIC Educational Resources Information Center

    Sousa, Francisco

    2016-01-01

    This article reports a study on collaboration within an action research project that was conducted by university researchers and elementary school teachers in the Azores, Portugal. More specifically, it examines how different kinds of participants worked together in different phases of the project. The notion of mutuality (i.e., the relative…

  9. Management Workshop for Alcohol Safety Action Project: Instructor's Guide.

    ERIC Educational Resources Information Center

    Human Resources Research Organization, Alexandria, VA.

    The instructor's guide is part of a series designed to help project directors in the management of Alcohol Safety Action Projects (ASAP) through management workshops. Workshops will discuss certain phases of the ASAP including National Highway Traffic Safety Administration (NHTSA) organizational and supportive efforts, countermeasures,…

  10. Is Action Research Necessarily Collaborative? Changing Mutuality within a Project

    ERIC Educational Resources Information Center

    Sousa, Francisco

    2016-01-01

    This article reports a study on collaboration within an action research project that was conducted by university researchers and elementary school teachers in the Azores, Portugal. More specifically, it examines how different kinds of participants worked together in different phases of the project. The notion of mutuality (i.e., the relative…

  11. Literacy Learning within Community Action Projects for Social Change

    ERIC Educational Resources Information Center

    Wright, Dana E.; Mahiri, Jabari

    2012-01-01

    This case study describes the literacy development of a struggling reader over a seven-month period as he engaged in a youth-led participatory action research (PAR) project. The project's goal was for youth participants to develop a proposal for productive change in their local community and present it to community stakeholders. The study focused…

  12. Action Research Projects in Pre-Service Teacher Education

    ERIC Educational Resources Information Center

    Clayton, Courtney; Meadows, George

    2013-01-01

    Classroom-centered Action Research Projects are an integral component of the M.S. in Elementary Education Program at the University's (pseudonym) College of Education. This article provides a summary and discussion of the projects completed by students in the Science, Technology, Literacy and English Language Learner Specializations of the…

  13. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  14. Final Verification Success Story Using the Triad Approach at the Oak Ridge National Laboratory's Melton Valley Soils and Sediment Project

    SciTech Connect

    King, D.A.; Haas, D.A.; Cange, J.B.

    2006-07-01

    The United States Environmental Protection Agency recently published guidance on the Triad approach, which supports the use of smarter, faster, and better technologies and work strategies during environmental site assessment, characterization, and cleanup. The Melton Valley Soils and Sediment Project (Project) at the Oak Ridge National Laboratory embraced this three-pronged approach to characterize contaminants in soil/sediment across the 1000-acre Melton Valley Watershed. Systematic Project Planning is the first of three prongs in the Triad approach. Management initiated Project activities by identifying key technical personnel, included regulators early in the planning phase, researched technologies, and identified available resources necessary to meet Project objectives. Dynamic Work Strategies is the second prong of the Triad approach. Core Team members, including State and Federal regulators, helped develop a Sampling and Analysis Plan that allowed experienced field managers to make real-time, in-the-field decisions and, thus, to adjust to conditions unanticipated during the planning phase. Real-time Measurement Technologies is the third and last prong of the Triad approach. To expedite decision-making, the Project incorporated multiple in-field technologies, including global positioning system equipment integrated with field screening instrumentation, magnetometers for utility clearance, and an on-site gamma spectrometer (spec) for rapid contaminant speciation and quantification. As a result of a relatively complex but highly efficient program, a Project field staff of eight collected approximately 1900 soil samples for on-site gamma spec analysis (twenty percent were also shipped for off-site analyses), 4.7 million gamma radiation measurements, 1000 systematic beta radiation measurements, and 3600 systematic dose rate measurements between July 1, 2004, and October 31, 2005. The site database previously contained results for less than 500 soil samples dating

  15. Getting to social action: the Youth Empowerment Strategies (YES!) project.

    PubMed

    Wilson, Nance; Minkler, Meredith; Dasho, Stefan; Wallerstein, Nina; Martin, Anna C

    2008-10-01

    This article describes the social action component of the Youth Empowerment Strategies (YES!) project funded by the Centers for Disease Control and Prevention through its community-based prevention research (CBPR) initiative. YES! is designed to promote problem-solving skills, social action, and civic participation among underserved elementary and middle school youth. The after-school program focuses on identifying and building youths' capacities and strengths as a means of ultimately decreasing rates of alcohol, tobacco, and other drug use and other risky behaviors. The article discusses the conceptual models of risk and intervention and factors contributing to successful social action work, including group dynamics, intragroup leadership, facilitator skills, and school-community contexts. Attention is focused on how the nature of the projects themselves played a key role in determining the likelihood of experiencing success. Implications and recommendations for other youth-focused empowerment education projects are discussed, including the effective use of Photovoice in such projects.

  16. Oak Wilt

    Treesearch

    Charles O. Rexrode; Daniel Brown

    1983-01-01

    Oak wilt, caused by the fungus Ceratocystis fagacearum (Bretz) Hunt, kills oak trees. It has been found in 21 States, with considerable damage occurring in the Midwest. It was first recognized as an important disease in 1944 in Wisconsin where, in localized areas (less than 100 acres (40.4 ha)), over half the oaks have been killed. Surveys in eight Wisconsin counties...

  17. Functional requirements of the borrow area and haul route for the Waste Area Grouping projects at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Miller, D.G.

    1992-09-01

    This report describes the mission and functional requirements for the development of a borrow area and the associated haul route to support closure and/or remediation of Waste Area Grouping (WAG) 6 and other WAGs at Oak Ridge National Laboratory. This document specifies the basic functional requirements that must be met by the borrow area and haul route developed to produce low-permeability soil for the covers or caps at WAG 6.

  18. Project quality assurance plan for research and development services provided by Oak Ridge National Laboratory in support of the Hanford Grout Disposal Program

    SciTech Connect

    Spence, R.D.; Gilliam, T.M.

    1991-11-01

    This Project Quality Assurance Plan (PQAP) is being published to provide the sponsor with referenceable documentation for work conducted in support of the Hanford WHC Grout Disposal Program. This plan, which meets NQA-1 requirements, is being applied to work performed at Oak Ridge National Laboratory (ORNL) during FY 1991 in support of this program. It should also be noted that with minor revisions, this plan should be applicable to other projects involving research and development that must comply with NQA-1 requirements.

  19. Multilingual Affordances in a Swedish Preschool: An Action Research Project

    ERIC Educational Resources Information Center

    Ljunggren, Åsa

    2016-01-01

    This article summarizes the work and the main findings of an action research project that was conducted in an early childhood education and care setting in the city of Malmö, Sweden in the autumn of 2013 and spring 2014. Rönnerman's model (Aktionsforskning i praktiken: förskola och skola på vetenskaplig grund [Action research in practice:…

  20. Multilingual Affordances in a Swedish Preschool: An Action Research Project

    ERIC Educational Resources Information Center

    Ljunggren, Åsa

    2016-01-01

    This article summarizes the work and the main findings of an action research project that was conducted in an early childhood education and care setting in the city of Malmö, Sweden in the autumn of 2013 and spring 2014. Rönnerman's model (Aktionsforskning i praktiken: förskola och skola på vetenskaplig grund [Action research in practice:…

  1. Assertiveness in nursing practice: an action research and reflection project.

    PubMed

    Taylor, Beverley; Edwards, Paul; Holroyd, Beth; Unwin, Anna; Rowley, Joanne

    2005-12-01

    This article describes an action research project that highlighted reflective processes, so hospital nurses could work systematically through problem solving processes to uncover constraints against effective nursing care; and to improve the quality of their care in light of the identified constraints and possibilities. Four Registered Nurses (RNs) co-researched their practice with the facilitator and over the research period identified the thematic concern of the need for assertiveness in their work. The RNs planned, implemented and evaluated an action plan and, as a direct result of their reflections and collaborative action, they improved their nursing practice in relation to becoming more effective in assertiveness in work situations.

  2. Uranium Mill Tailings Remedial Action (UMTRA) Surface Project: Project plan. Revision 1

    SciTech Connect

    Not Available

    1993-08-11

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) [Public Law (PL) 95-604, 42 United States Code (USC) 7901], hereinafter referred to as the ``Act,`` authorizes the US Department of Energy (DOE) to stabilize and control surface tailings and ground water contamination. To fulfill this mission, the DOE has established two projects under the Uranium Mill Tailings Remedial Action (UMTRA) Project Office. The Ground Water Project was established in April 1991 as a major project and a separate project plan will be prepared for that portion of the mission. This project plan covers the UMTRA Surface Project, a major system acquisition (MSA).

  3. Culminating Experience Action Research Projects, Volume 13, Fall 2008

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  4. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... do not substantially change the effect of legislation or regulations being amended; (3) Compliance..., analysis, and dissemination; (6) Conceptual or feasibility studies; (7) Actions concerning the reservation... exhibits that propose no changes to project works or operations or that reflect changes that...

  5. Culminating Experience Action Research Projects, Volume 3, Spring 2003.

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Moyer, Peggy S., Ed.

    This document presents the course syllabus for Education 590 Culminating Experience at the University of Tennessee at Chattanooga's teacher licensure program. It also includes action research projects from spring 2003: "'To Track or Untrack...That Is the Question'" (Sarah Armes); "Providing Urban Students with the Motivation to…

  6. Project SAVE, Student Action for Valuing the Environment.

    ERIC Educational Resources Information Center

    Cripe, Julie, Ed.; Wright, Joe, Ed.

    Project SAVE (Student Action for Valuing the Environment) encourages a team approach to solving environmental problems. SAVE suggests that students initiate, create, and implement practical approaches to solving community environmental problems. Included in this publication are descriptions of 13 exemplary programs that include elementary schools,…

  7. Play and Literacy: A Collaborative Action Research Project in Preschool

    ERIC Educational Resources Information Center

    Einarsdottir, Johanna

    2014-01-01

    The article describes a collaborative action research in a preschool in Reykjavik. The participants were two preschool teachers who collaborated with researchers at the University of Iceland. The project was set up as a professional development course for the teachers. Emphasis was placed on continuity in children's education, integration of play…

  8. Project ASSIST: Action Strategies for Implementing Social Transition.

    ERIC Educational Resources Information Center

    Urban League of Greater New Orleans, LA.

    Project ASSIST (Action Strategies for Implementing Social Transition) is an attempt to assess the needs, concerns, problems, strengths, and preferences of low income area residents within the city of New Orleans by developing primary based data. This report presents the findings of two major surveys, in which 1,306 households in eight low income…

  9. Culminating Experience Action Research Projects, Volume 7, Fall 2005

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Fritch, Sarah C., Ed.

    2007-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  10. Culminating Experience Action Research Projects, Volume 17, Fall 2010

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 5900 Culminating…

  11. Blogging across the Curriculum: An Action Research Project

    ERIC Educational Resources Information Center

    Nichols, Andrea

    2012-01-01

    "Blogging across the curriculum: Integrating blogging in the elementary classroom" is an Action Research Project that sought to explore the level of engagement in the writing process by students in grades 3, 4 & 5 while blogging across the curriculum. Blogging took place in homeroom classrooms as well as in the school's math, science and…

  12. Slipping Pages through Razor Wire: Literacy Action Projects in Jail

    ERIC Educational Resources Information Center

    Jacobi, Tobi

    2008-01-01

    This essay explores the intersection between writing studies and civic engagement through the action projects developed in E465: Prison Literature and Writing. Such literacy activism creates immediate opportunities for advanced undergraduates to more fully understand the work of literacy in contested spaces like jail and extends a call to action…

  13. Culminating Experience Action Research Projects, Volume 10, Spring 2007

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Deaver, Sharon R., Ed.

    2008-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  14. The Reflective Dispositional Coaching Process: An Action Research Project

    ERIC Educational Resources Information Center

    Bell, Edwin D.; Grant, Kathy; Fisk-Moody, Patricia

    2007-01-01

    The authors implemented an action research project to help teacher education candidates to reflect upon, assess, and ultimately strengthen teacher candidate dispositions through the Reflective Dispositional Coaching Model. The teacher education faculty agreed that candidate dispositions should address four areas: (a) professionalism, (b)…

  15. Culminating Experience Action Research Projects, Volume 14, Spring 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  16. The Role of Facilitators in Project Action Learning Implementation

    ERIC Educational Resources Information Center

    Cao, Rui; Chuah, Kong Bieng; Chao, Yiu Chung; Kwong, Kar Fai; Law, Mo Yin

    2012-01-01

    Purpose: This paper addresses the importance of a more proactive role of organizational learning (OL) facilitators, learning motivation reinforcer, through a two-part longitudinal study in a case company. The first part of this study aims to investigate and analyze some unexpected challenges in the project action learning-driven (PAL) OL…

  17. Community Energy Project of ACTION's Office of Voluntary Citizen Participation

    SciTech Connect

    Crangle, M

    1980-01-01

    Several memoranda dated from March 4, 1980 to September 18, 1980 from the Community Energy Project personnel to the Acting Director of Weatherization Assistance Program within ACTION are compiled. Information on community-based efforts and programs for low cost/no cost energy conservation is presented. (LCL)

  18. Strategic Approaches to Practice: An Action Research Project

    ERIC Educational Resources Information Center

    Burwell, Kim; Shipton, Matthew

    2013-01-01

    The importance of personal practice for instrumentalists and vocalists is well established among researchers, and axiomatic for practitioners. This paper reports on a phase of an action research project, investigating student approaches to personal practice. Following a preliminary questionnaire study, a residential clinic was conducted by…

  19. Culminating Experience Action Research Projects, Volume 9, Fall 2006

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Ezell, Benjamin T., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  20. Culminating Experience Action Research Projects, Volume 6, Fall 2004

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Bothman, Susan M., Ed.

    2005-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  1. Health Activities Project (HAP): Heart Fitness and Action Module.

    ERIC Educational Resources Information Center

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) learning packet are activities for children in grades 5-8. Design of the activities centers around the idea that students can control their own health and safety. Within the Heart Fitness and Action Module are teacher and student folios describing five activities which involve students in…

  2. Culminating Experience Action Research Projects, Volume 5, Spring 2004

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Bothman, Susan M., Ed

    2005-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  3. The Role of Facilitators in Project Action Learning Implementation

    ERIC Educational Resources Information Center

    Cao, Rui; Chuah, Kong Bieng; Chao, Yiu Chung; Kwong, Kar Fai; Law, Mo Yin

    2012-01-01

    Purpose: This paper addresses the importance of a more proactive role of organizational learning (OL) facilitators, learning motivation reinforcer, through a two-part longitudinal study in a case company. The first part of this study aims to investigate and analyze some unexpected challenges in the project action learning-driven (PAL) OL…

  4. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse

    PubMed Central

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus “alcohol culture.” Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one’s community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course. PMID:27385923

  5. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse.

    PubMed

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course.

  6. Rehabilitation of an oak planting project on cleared rangeland using treeshelters and grazing: a ten-year saga

    Treesearch

    Jerry Tecklin; Michael Connor; Douglas D. McCreary

    2002-01-01

    On a 2-hectare site at the Sierra Foothill Research and Extension Center near Marysville, California, 1,440 blue oaks (Quercus douglasii) were planted during 1990-91 in an attempt to re-vegetate an oak woodland that had been almost totally cleared for cattle grazing during the mid-1960s. This initial planting of acorns, 4-month old seedlings, and 1-...

  7. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  8. Reflections on an Action Research Project in Teacher Education: The Emancipatory Project under Scrutiny

    ERIC Educational Resources Information Center

    Christiansen, Iben

    2008-01-01

    The Advanced Certificate of Education (ACE) specialisation in mathematics (for the FET) at the University of KwaZulu-Natal includes a module on professional practice in mathematics education. As part of this module students complete an action research project on their own teaching. This article describes both the progression of one action research…

  9. Beyond You and Me: Stories for Collective Action and Learning? Perspectives from an Action Research Project

    ERIC Educational Resources Information Center

    Gearty, Margaret

    2015-01-01

    This paper explores the combination of storytelling and reflective action research as a means to effect change and learning within and across communities and organizations. Taking the complex challenge of "pro-environmental behaviour change" as an example, the paper reflects on the experiences of a pilot project run for the UK government…

  10. Beyond You and Me: Stories for Collective Action and Learning? Perspectives from an Action Research Project

    ERIC Educational Resources Information Center

    Gearty, Margaret

    2015-01-01

    This paper explores the combination of storytelling and reflective action research as a means to effect change and learning within and across communities and organizations. Taking the complex challenge of "pro-environmental behaviour change" as an example, the paper reflects on the experiences of a pilot project run for the UK government…

  11. Taking Action: An Educator's Guide to Involving Students in Environmental Action Projects.

    ERIC Educational Resources Information Center

    Stoner, Darlene K.; And Others

    The goal of Project WILD, a K-12 interdisciplinary conservation and environmental education program emphasizing wildlife, is to assist learners of any age in developing awareness, knowledge, skills, and commitment resulting in informed decisions, responsible behavior, and constructive actions concerning wildlife and the environment. The purpose of…

  12. Oak Ridge K-25 Site Technology Logic Diagram. Volume 3, Technology evaluation data sheets; Part B, Remedial action, robotics/automation, waste management

    SciTech Connect

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration (ER) and waste management (WN) problems at the Oak Ridge K-25 Site. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remediation, decontamination, and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This volume 3 B provides the Technology Evaluation Data Sheets (TEDS) for ER/WM activities (Remedial Action Robotics and Automation, Waste Management) that are referenced by a TEDS code number in Vol. 2 of the TLD. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than each technology in Vol. 2. The TEDS are arranged alphanumerically by the TEDS code number in the upper right corner of each data sheet. Volume 3 can be used in two ways: (1) technologies that are identified from Vol. 2 can be referenced directly in Vol. 3 by using the TEDS codes, and (2) technologies and general technology areas (alternatives) can be located in the index in the front of this volume.

  13. Oak Tatters

    Treesearch

    Linda Haugen; Phil Marshall; Jane Cummings Carlson; Mark Vitosh; Ed Hayes

    2000-01-01

    Oak tatters is a relatively new condition that affects emerging oak leaves, causing them to appear lacy or tattered. It has been observed throughout the Midwestern United States, including Minnesota, Michigan, Wisconsin, Iowa, Illinois, Indiana, Ohio, and Missouri. This disorder was first reported during the 1980's in Iowa, Indiana and Ohio, but has been observed...

  14. Regulator Interface Strategies Implemented at the Y-12 National Security Complex Old Salvage Yard Soils Remediation Project, Oak Ridge, TN - 12162

    SciTech Connect

    Albrecht, Linda; Wilkerson, Laura; Skinner, Ralph; Birchfield, Joseph W. III

    2012-07-01

    The Oak Ridge Y-12 National Security Complex housed an area known as the Old Salvage Yard (OSY) that was approximately 7 acres. The OSY was used as an area for the accumulation, processing and storage of scrap metal and equipment from Y-12 operations extending from 1968 until 2009. Areas in the northern sections of OSY also have been used for the storage of used oils containing solvents and the accumulation and recycling or de-heading and crushing of 55-gal metal drums. Scrap metal operations historically involved the accumulation, sorting, storage, public sale or disposal of scrap metal and equipment. Non-containerised storage of scrap metal was routine until 1995 when scrap metal received at OSY was placed in B-24 and B-25 boxes. Under the American Recovery and Reinvestment Act (ARRA), approximately 26,759 cubic meters of scrap metal and debris were removed and disposed at both on and off-site disposal facilities including the on-site, Oak Ridge Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) landfill in 2010 and 2011. This removal action was performed in accordance with a CERCLA Record of Decision (ROD) and a close working relationship with both the U.S. Environmental Protection Agency (EPA) Region IV and Tennessee Department of Environment and Conservation (TDEC). Due to efficiencies and the excellent cooperative relationship forged with EPA Region IV and TDEC for Y-12 ARRA Cleanup Projects, a surplus of funding was available for additional remediation work that was completed in fiscal year (FY) 2011. The underlying OSY soils were targeted for characterization and potential remediation. To expedite these important activities, the U.S. Department of Energy Oak Ridge Environmental Management partnered with the regulators during detailed planning sessions through a variety of means to quickly and efficiently characterize and pinpoint areas requiring remediation according to previous ROD commitments. Data Quality Objectives (DQOs

  15. California Freshwater Shrimp Project: An Eco-Action Project with Real Life Learning.

    ERIC Educational Resources Information Center

    Rogers, Laurette H.

    The California Freshwater Shrimp Project is an example of a student-initiated, eco-action project. Students, from a fourth grade class in the Ross Valley School District in San Rafael, California, were linked to their community and environment through their work in rehabilitating habitat and educating the public. The paper gives an overview of a…

  16. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  17. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  18. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  19. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  20. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  1. Snags and Down Wood on Upland Oak Sites in the Missouri Ozark Forest Ecosystem Project

    Treesearch

    Stephen R. Shifley; Brian L. Brookshire; David R. Larsen; Laura A. Herbeck; Randy G. Jensen

    1997-01-01

    We analyzed volume, surface area, and percent cover of down wood to determine if there were pre-treatment differences among the sites in the Missouri Ozark Forest Ecosystem Project. We also compared pre-treatment values for the number and basal area of snags. We observed no statistically significant differences (P > 0.05) among treatment classes for these...

  2. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    SciTech Connect

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  3. Bioreactor Landfill Research and Demonstration Project Northern Oaks Landfill, Harrison, MI

    SciTech Connect

    Zhao, Xiando; Voice, Thomas; and Hashsham, Syed A.

    2006-08-29

    A bioreactor landfill cell with 1.2-acre footprint was constructed, filled, operated, and monitored at Northern Oaks Recycling and Disposal Facility (NORDF) at Harrison, MI. With a filled volume of 74,239 cubic yards, the cell contained approximately 35,317 tons of municipal solid waste (MSW) and 20,777 tons of cover soil. It was laid on the slope of an existing cell but separated by a geosynthetic membrane liner. After the cell reached a design height of 60 feet, it was covered with a geosynthetic membrane cap. A three-dimensional monitoring system to collect data at 48 different locations was designed and installed during the construction phase of the bioreactor cell. Each location had a cluster of monitoring devices consisting of a probe to monitor moisture and temperature, a leachate collection basin, and a gas sampling port. An increase in moisture content of the MSW in the bioreactor cell was achieved by pumping leachate collected on-site from various other cells, as well as recirculation of leachate from the bioreactor landfill cell itself. Three types of leachate injection systems were evaluated in this bioreactor cell for their efficacy to distribute pumped leachate uniformly: a leachate injection pipe buried in a 6-ft wide horizontal stone mound, a 15-ft wide geocomposite drainage layer, and a 60-ft wide geocomposite drainage layer. All leachate injection systems were installed on top of the compacted waste surface. The distribution of water and resulting MSW moisture content throughout the bioreactor cell was found to be similar for the three designs. Water coming into and leaving the cell (leachate pumped in, precipitation, snow, evaporation, and collected leachate) was monitored in order to carry out a water balance. Using a leachate injection rate of 26 – 30 gal/yard3, the average moisture content increased from 25% to 35% (wet based) over the period of this study. One of the key aspects of this bioreactor landfill study was to evaluate bioreactor

  4. 77 FR 68818 - Notice of Inventory Completion: U.S. Department of Energy Oak Ridge Office, Oak Ridge, TN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... Inventory Completion: U.S. Department of Energy Oak Ridge Office, Oak Ridge, TN AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The U.S. Department of Energy Oak Ridge Office has completed... U.S. Department of Energy Oak Ridge Office. Repatriation of the human remains and associated...

  5. Quality Assurance Program Plan for the radiological survey activities program --- Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    Knott, R.R.; Little, C.A.

    1991-08-01

    The Pollutant Assessments Group (PAG) at the Grand Junction Office (GJO), Colorado, of Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude these sites from UMTRAP based on whether the on-site residual radioactive material (if any) originated from the former mill sites, and radiation levels on-site are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the Quality Assurance Plan (QAP) for the PAG in conducting all activities related to UMTRAP. All quality assurance provisions given by the DOE, DOE/UMTRA and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the PAG/UMTRA QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups. 11 refs., 6 figs., 3 tabs.

  6. Project InterActions: A Multigenerational Robotic Learning Environment

    NASA Astrophysics Data System (ADS)

    Bers, Marina U.

    2007-12-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both parents and children about the mechanical and programming aspects involved in robotics, as well as to initiate them in a learning trajectory with and about technology. Results from this project address different ways in which parents and children learn together and provide insights into how to develop educational interventions that would educate parents, as well as children, in new domains of knowledge and skills such as robotics and new technologies.

  7. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  8. Safety analysis report for the gunite and associated tanks project remediation of the South Tank Farm, facility 3507, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Platfoot, J.H.

    1998-02-01

    The South Tank Farm (STF) is a series of six, 170,000-gal underground, domed storage tanks, which were placed into service in 1943. The tanks were constructed of a concrete mixture known as gunite. They were used as a portion of the Liquid Low-Level Waste System for the collection, neutralization, storage, and transfer of the aqueous portion of the radioactive and/or hazardous chemical wastes produced as part of normal facility operations at Oak Ridge National Laboratory (ORNL). The last of the tanks was taken out of service in 1986, but the tanks have been shown by structural analysis to continue to be structurally sound. An attempt was made in 1983 to empty the tanks; however, removal of all the sludge from the tanks was not possible with the equipment and schedule available. Since removal of the liquid waste in 1983, liquid continues to accumulate within the tanks. The in-leakage is believed to be the result of groundwater dripping into the tanks around penetrations in the domes. The tanks are currently being maintained under a Surveillance and Maintenance Program that includes activities such as level monitoring, vegetation control, High Efficiency Particulate Air (HEPA) filter leakage requirement testing/replacement, sign erection/repair, pump-out of excessive liquids, and instrument calibration/maintenance. These activities are addressed in ORNL/ER-275.

  9. Final deactivation project report on the High Radiation Level Analytical Facility, Building 3019B at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1997-09-01

    The purpose of this report is to document the condition of the High Radiation Level Analytical Facility (Building 3019B) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities. This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the Environmental Restoration EM-40 Program. This document provides a history and description of the facility prior to the commencement of deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S&M) Plan, remaining hazardous materials inventory, radiological controls, safeguards and security, quality assurance, facility operations, and supporting documentation provided in the Nuclear Material and Facility Stabilization (EM-60) Turnover package are discussed. Building 3019B will require access to perform required S&M activities to maintain the building safety envelope. Building 3019B was stabilized during deactivation so that when transferred to the EM-40 Program, only a minimal S&M effort would be required to maintain the building safety envelope. Other than the minimal S&M activities the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only to perform the required S&M until decommissioning activities begin.

  10. Environmental health and safety plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Burman, S.N.; Tiner, P.F.; Gosslee, R.C.

    1998-01-01

    The Lockheed Martin Energy Systems, Inc. (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at the Molten Salt Reactor Experiment (MSRE) facility at the Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) are guided by an overall plan and consistent proactive approach to environmental protection and safety and health (S and H) issues. The policy and procedures in this plan apply to all MSRE operations. The provisions of this plan are to be carried out whenever activities are initiated at the MSRE that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and the best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air.

  11. Evaluation of an action research project in ophthalmic nursing practice.

    PubMed

    Waterman, Heather; Harker, Rona; MacDonald, Heather; McLaughlan, Rita; Waterman, Christine

    2005-11-01

    This paper reports the evaluation phase of an action research project that promoted face-down posturing of patients following vitreo-retinal surgery for macular hole to enhance patient outcomes. The evaluation phase identified areas of practice needing further development from the perspectives of those involved with the care of patients. To achieve best results following surgical repair of macular hole, patients are required to posture face down for several weeks. As a consequence, patients complain of severe back and neck ache and find it difficult to persist with the posturing. Work to advance nursing practice as surgical developments occur has relevance beyond ophthalmology and the particular context of this project. The first three phases of this action research--problem identification, planning and action--have been reported in another paper. Throughout the project an action research group comprising of representatives of key stakeholders were actively involved in researching and changing practice. During the evaluation phase, a qualitative methodology was chosen. Interviews with 17 members of staff from the inpatient area were carried out to elicit their perspectives on the posturing of patients. Qualitative interviews were selected to facilitate comparison with interview data from Phase 1. Data analysis ran concurrently with data collection, so that one could inform the other. Overall, nurses and healthcare support workers felt that patients were more agreeable to posturing and after surgery began to posture more quickly. Communication was still an issue in some instances, and patients having urgent as opposed to planned surgery were found to be more difficult to prepare and the psychological care of patients still posed problems for nursing staff. The evaluation suggests that improvements in the care of this group of patients have occurred. A 10-point plan to promote face-down posturing has been developed which will be of use to practitioners in other

  12. Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site

    SciTech Connect

    DOE /NV

    1998-11-01

    This Corrective Action Investigation Plan (CAIP) describes the US Department of Energy's (DOE's) continued environmental investigation of the subsurface Project Shoal Area (PSA) Corrective Action Unit (CAU) 447. The PSA is located in the Sand Springs Mountains in Churchill County, Nevada, about 48 kilometers (km) (30 miles [mi]) southeast of Fallon, Nevada. Project Shoal was part of the Vela Uniform Program which was conducted to improve the US' ability to detect, identify, and locate underground nuclear detonations. The test consisted of detonating a 12-kiloton nuclear device deep underground in granitic rock to determine whether seismic waves produced by an underground nuclear test could be differentiated from seismic waves produced by a naturally occurring earthquake. The test was a joint effort conducted by the US Atomic Energy Commission (AEC) and the US Department of Defense (DoD) in October 1963 (AEC, 1964).

  13. A low complexity reweighted proportionate affine projection algorithm with memory and row action projection

    NASA Astrophysics Data System (ADS)

    Liu, Jianming; Grant, Steven L.; Benesty, Jacob

    2015-12-01

    A new reweighted proportionate affine projection algorithm (RPAPA) with memory and row action projection (MRAP) is proposed in this paper. The reweighted PAPA is derived from a family of sparseness measures, which demonstrate performance similar to mu-law and the l 0 norm PAPA but with lower computational complexity. The sparseness of the channel is taken into account to improve the performance for dispersive system identification. Meanwhile, the memory of the filter's coefficients is combined with row action projections (RAP) to significantly reduce computational complexity. Simulation results demonstrate that the proposed RPAPA MRAP algorithm outperforms both the affine projection algorithm (APA) and PAPA, and has performance similar to l 0 PAPA and mu-law PAPA, in terms of convergence speed and tracking ability. Meanwhile, the proposed RPAPA MRAP has much lower computational complexity than PAPA, mu-law PAPA, and l 0 PAPA, etc., which makes it very appealing for real-time implementation.

  14. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  15. Using Collaborative Action Learning Projects to Increase the Impact of Management Development

    ERIC Educational Resources Information Center

    Lyso, Ingunn Hybertsen; Mjoen, Kristian; Levin, Morten

    2011-01-01

    This article aims to contribute to the field of human resource development by exploring the conditions that influence the organizational impact of action learning projects. Many organizations use such projects as an integral part of their management development programs. Past research on action learning projects has shown how balancing action and…

  16. Using Collaborative Action Learning Projects to Increase the Impact of Management Development

    ERIC Educational Resources Information Center

    Lyso, Ingunn Hybertsen; Mjoen, Kristian; Levin, Morten

    2011-01-01

    This article aims to contribute to the field of human resource development by exploring the conditions that influence the organizational impact of action learning projects. Many organizations use such projects as an integral part of their management development programs. Past research on action learning projects has shown how balancing action and…

  17. Nursing Documentation: An Evaluation of an Action Research Project.

    PubMed

    Vabo, Grete; Slettebø, Åshild; Fossum, Mariann

    2016-01-01

    This abstract describes an evaluation of an action research project conducted to improve nursing documentation practice in four municipalities in Norway. In an explorative design, four focus group interviews and two individual interviews were conducted. The interview data were analyzed using content analysis. Three themes emerged: healthcare professionals perceived the documentation process as complicated; they experienced competing interests; and they highlighted a clear and visible leader as important for success. This study provides knowledge about the importance of collaboration and involvement of stakeholders when developing electronic health record systems.

  18. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Light Rail Project in... meaning of 23 U.S.C. 139(l)(1). The actions relate to the East Link Light Rail Transit Project in King... approvals for the following project in the State of Washington: East Link Light Rail Transit Project,...

  19. Public opinion and communicative action around renewable energy projects

    NASA Astrophysics Data System (ADS)

    Fast, Stewart

    This thesis investigates how rural communities negotiate the development of renewable energy projects. Public and local community acceptance of these new technologies in rural areas around the world is uncertain and spatially uneven and represents an area of emerging public policy interest and one where scholarly theory is rapidly developing. This thesis uses Habermasian concepts of public sphere, communicative action and deliberative democracy, as well as the concept of "wicked problems" from the planning studies literature combined with geographical concepts of place and scale to advance theoretical and empirical understanding of how public opinion on renewable energy technologies is formed in place. It documents energy use patterns, attitudes and socio-political relations at a time when considerable state and business efforts are directed at the construction of solar, wind, biomass and small-hydro technologies in rural regions. These concepts and theories are applied in a case study of rural communities in the Eastern Ontario Highlands, an impoverished area undergoing rapid restructuring driven by centralization of services and amenity migration but with abundant natural resources in form of forests, numerous waterways and open space which have attracted a broad range of new energy developments. Overall high levels of support for alternative energy development particularly for solar power were found, albeit for reasons of local energy security and not for reasons of preventing climate change. There was some evidence that seasonal residents are less supportive of hydro and biomass projects than permanent residents possibly reflecting broader trends in rural economies away from productive uses of land to consumptive appreciation of rural landscapes. The thesis suggests that collective action to advance energy projects in the case study area require agreement along three world-claims (truth, rightness and truthfulness) and that communication leading to discourse

  20. FY 1995 Remedial Investigation Work Plan for Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Watkins, D.R.; Herbes, S.E.

    1994-12-01

    The purpose of this project is to provide key information needed by decision makers to expedite the process of environmental restoration and to provide the data base required by the Remedial Investigation/Feasibility Study (RI/FS) for Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL). WAG 2 is the major drainage system downgradient of other WAGs that contain significant sources of contamination at ORNL. Field activities to support the remedial investigation for the RI portion include characterization of the nature and extent of contamination in WAG 2 [consisting of White Oak Creek (WOC) and associated tributaries and floodplain, White Oak Lake (WOL), and White Oak Creek Embayment (WOCE)], specifically to support risk-based remediation decisions. The project consists of three phases: Phase 1, initial scoping characterization to determine the need for early action; Phase 2, interim activities during remediation of upslope WAGs to evaluate potential changes in the contamination status of WAG 2 that would necessitate revaluation of the need for early action; and Phase 3, completion of the RI process following remediation of upslope WAGs. Overall RI objectives, consistent with ORNL Environmental Restoration (ER) Program strategic objectives to reduce risks and comply with environmental regulations, are discussed in the WAG 2 Remedial Investigation Plan.

  1. Applicable or Relevant and Appropriate Requirements (ARARs) for Remedial Action at the Oak Ridge Reservation: A compendium of major environmental laws. Environmental Restoration Program

    SciTech Connect

    Etnier, E.L.; McDonald, E.P.; Houlberg, L.M.

    1993-07-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances must comply with applicable or relevant and appropriate requirements (ARARS) or standards under federal and state environmental laws. The US Department of Energy (DOE) Oak Ridge Reservation (ORR) was placed on the National Priorities List by the US Environmental Protection Agency (EPA) on November 21, 1989, effective December 21, 1989. As a result of this listing, DOE, EPA, and the Tennessee Department of Environment and Conservation have signed a Federal Facility Agreement (FFA) for the environmental restoration of the ORR. Section XXI(F) of the FFA calls for the preparation of a draft listing of all ARARs as mandated by CERCLA {section}121. This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at the ORR. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Tennessee are listed in tables. In addition, the major provisions of the Resource Conservation and Recovery Act, the Safe Drinking Water Act, the Clean Water Act, the Clean Air and other acts, as they apply to hazardous waste cleanup, are discussed. In the absence of ARARS, CERCLA {section}121 provides for the use of nonpromulgated federal criteria, guidelines, and advisories in evaluating the human risk associated with remedial action alternatives. Such nonpromulgated standards are classified as ``to-be-considered`` (TBC) guidance. A ion of available guidance is given; summary tables fist the available federal standards and guidance information. In addition, the substantive contents of the DOE orders as they apply to remediation of radioactively contaminated sites are discussed as TBC guidance.

  2. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  3. Programmatic Environmental Report for remedial actions at UMTRA (Uranium Mill Tailings Remedial Action) Project vicinity properties

    SciTech Connect

    Not Available

    1985-03-01

    This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs.

  4. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan. Revised

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  5. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  6. Superfund Record of Decision (EPA Region 4): Brown Wood Preserving site, Live Oak, Florida (First remedial action) August 1988. Final report

    SciTech Connect

    Not Available

    1988-04-08

    The Brown Wood Preserving site is located west of the City of Live Oak, Suwanee County, Florida. The site contains a former wood-preserving plant facility, which pressure treated timber products with creosote and some pentachlorophenol (PCP) for thirty years between 1948 and 1978. Sludge and contaminated soils have been identified in the immediate vicinity of the plant site and an upgradient lagoon. This three-acre lagoon drains approximately 74 acres and contains water provided above approximately 3,000 cu yd of creosote sludge and contaminated soil. In addition, small amounts of solidified creosote and PCP are contained in onsite storage tanks and retorts. The primary contaminants of concern affecting the soil, sediments, sludge, and waste water are creosote constituents including PAHs. The selected remedial action for the site includes: removal and treatment, if necessary, of lagoon water; excavation, treatment, and offsite disposal of approximately 1,500 tons of the most severely contaminated soil and sludge; onsite biodegradation of approximately 10,000 tons of the remaining soils in a 14-acre treatment area constructed with a liner and an internal drainage and spray irrigation system; covering of the treatment area with clean fill after bioremediation; and ground water monitoring.

  7. Oak Decline

    Treesearch

    Vernon Ammon; T. Evan Nebeker; Ted H. Filer; Francis I. McCracken; J. D. Solomon; H. E. Kennedy

    1989-01-01

    Occurrence of decline and mortality in this nation's hardwood forests has been documented in reports for the past 130 years. From 1856 through 1981, more than 26 decline events were reported from eight eastern states affecting almost all species of oaks. Fourteen factors have been implicated as either primary or secondary agents responsible for decline and...

  8. Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2008-01-01

    This report presents the 2007 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. Requirements for CAU 447, as specified in the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense (DOD), and the State of Nevada, includes groundwater monitoring in support of site closure. This is the first groundwater monitoring report prepared by DOE-LM for the PSA.

  9. Corrective Action Plan for underground storage tanks 1219-U, 1222-U, 2082-U, and 2068-U at the Rust Garage Facility, Buildings 9720-15 and 9754-1. Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, Facility ID No. 0-010117

    SciTech Connect

    Bohrman, D.E.; Ingram, E.M.

    1992-04-01

    This document represents the Corrective Action Plan for underground storage tanks 1219-U, 1222-U, and 2068-U, all previously located at the Buildings 9720-15/ 9754-1 site (Facility Identification {number_sign}0-010117), Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. This site is commonly referred to as the ``Rust Garage Facility`` and will be so referenced in this document hereafter. This document presents a comprehensive summary of all environmental assessment investigations conducted at the Rust Garage Facility and the corrective action measures that are proposed for remediation of subsurface petroleum contamination identified at the facility. This document is written in accordance with the regulatory requirements of the Tennessee Department of Environment and Conservation (TDEC) Rule 1200-1-15-.06(7). The Corrective Action Plan for the Rust Garage Facility incorporates all elements of both the Corrective Action Plan Format and the Environmental Assessment Report/Corrective Action Plan guidelines that are applicable to the facility. However, in cases where the latter guideline elements offered the more precise and clear presentation of applicable information, they were used in place of elements detailed in the Corrective Action Plan Format.

  10. Preventing heart disease through community action: the North Karelia Project.

    PubMed

    Guest, I

    1978-01-01

    In an effort to deal with their province's abnormally high incidence of heart disease, the people of North Karelia, Finland persuaded the government to establish a special project. Initiated in 1972, the project - led by epidemiologist, Dr. Pekka Puska - appears to have had considerable success in lowering the rate of heart disease. 3 risk factors - or likely causes - were identified, and each cause has been the object of a separate campaign. The 3 factors are hypertension, smoking, and high levels of cholesterol in the blood. The easiest of the 3 "risk factors" to fight effectively has been hypertension, because it simply was a matter of adjusting to the new government health services. The greatest success has come with the anti-smoking campaign. An information blitz, obsessive and non-stop interest among the media, canny use of existing animators worked together to make smoking a public crime in North Karelia and to lower the rates and risk of heart disease. 1 of the key elements is group sessions involving 10 or more people who wish to give up smoking. The most difficult of the 3 separate programs has involved cholesterol. Primarily a question of diet, cholesterol has been checked by community action, such as health food meals. Cholesterol reveals the project's limitation and why it fails to act as an entry point into wider political involvement. The diet of North Karelia is heavily influenced by the area's dependency on dairy farming. This raises the broader issue of changing methods of agricultural production, which may not be to the short-term economic advantage of North Karelia.

  11. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    SciTech Connect

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC).

  12. The Gunite Tanks Remediation Project at Oak Ridge National Laboratory; Successful Integration & Deployment of Technologies Results in Remediated Underground Storage Tanks

    SciTech Connect

    Billingsley, K.; Bolling, D.

    2002-02-27

    This paper presents an overview of the underground technologies deployed during the cleanup of nine large underground storage tanks (USTs) that contained residual radioactive sludge, liquid low-level waste (LLLW), and other debris. The Gunite Tanks Remediation Project at Oak Ridge National Laboratory (ORNL) was successfully completed in 2001, ending with the stabilization of the USTs and the cleanup of the South Tank Farm. This U.S. Department of Energy (DOE) project was the first of its kind completed in the United States of America. The Project integrated robotic and remotely operated technologies into an effective tank waste retrieval system that safely retrieved more than 348 m3 (92,000 gal) of radioactive sludge and 3.15E+15 Bq (85,000 Ci) of radioactive contamination from the tanks. The Project successfully transferred over 2,385 m3 (630,000 gal) of waste slurry to ORNL's active tank waste management system. The project team avoided over $120 Million in costs and shortened the original baseline schedule by over 10 years. Completing the Gunite Tanks Remediation Project eliminated the risks posed by the aging USTs and the waste they contained, and avoid the $400,000 annual costs associated with maintaining and monitoring the tanks.

  13. Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project

    SciTech Connect

    Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E.; Yerace, P.J.

    1996-02-01

    Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded.

  14. Rural Community Action: A Series of Case Studies of Action Projects in Small New York State Communities. Miscellaneous Bulletin 116.

    ERIC Educational Resources Information Center

    Preston, James C.; Halton, Katherine B.

    The report presents case studies of 7 community action projects which were undertaken by New York communities with populations under 10,000 and which show how local leaders can improve the quality of life in their communities. The report describes the background, initiation, expansion, implementation, consequences, and highlights of the projects,…

  15. Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-12-01

    In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

  16. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    SciTech Connect

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

  17. Moving beyond Consultation and into Action with a Client Project

    ERIC Educational Resources Information Center

    Ewing, Sara; Dover, Howard F.

    2012-01-01

    Attempting to implement client-based projects within a single semester often overwhelms students and underwhelms the client and grading professor. In this paper, we share results from a two-year pilot project in which the components of a client project were split between several classes. We discuss the client project model as a valuable teaching…

  18. A Dendrochronological Analysis of Red Oak Borer Abundance

    Treesearch

    Rose-Marie Muzika; Richard P. Guyette

    2004-01-01

    Unprecedented outbreaks of red oak borer (Enaphalodes rufulus Haldemann) have occurred in the lower Midwestern United States. Although generally not a mortality agent, red oak borer appears to contribute to general oak decline and mortality. The objective of this project was to explore dendrochronology as a means of determining the role of tree age,...

  19. Reshaping Literacy in a High Poverty Early Childhood Classroom: One Teacher's Action Research Project

    ERIC Educational Resources Information Center

    Rose, Lynnette; Vaughn, Margaret; Taylor, Linda

    2015-01-01

    This research explores an action research project conducted by the first author focused on supporting her preschool students' literacy and language development. Using observations, interviews, artifacts, and assessment, this research documents the first author's process of conducting an action research project over the course of one year to…

  20. 75 FR 82001 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... Board, Oak Ridge Reservation AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak... Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830. FOR FURTHER INFORMATION CONTACT: Patricia J...

  1. Oak Leaftier and Oak Leafroller (Pest Alert)

    Treesearch

    USDA Forest Service

    1998-01-01

    The oak leaftier, Croesia semipurpurana (Kearfott), and the oak leafroller, Archips semiferanus (Walker), are important Tortricidae moths in a complex of native species feeding in the early spring on oak foliage throughout the forests of Eastern North America. Outbreaks periodically develop with frequent and severe defoliation resulting in tree mortality. The last...

  2. Oak Tree Preservation in Thousand Oaks, California

    Treesearch

    William F. Elmendorf

    1991-01-01

    The City of Thousand Oaks over the last 20 years has taken aggressive steps to preserve and protect the City's namesake, the oak tree. First adopted in 1972 as an Emergency City Council Proclamation, the City's Oak Tree Ordinance has been considered by some, to be one of the first and toughest municipal native tree preservation ordinances within the State of...

  3. Project CHECO Southeast Asia Report. USAF Civic Action in Republic of Vietnam

    DTIC Science & Technology

    1968-04-01

    HUMANITARIAN ACTIVITIES ................................ 41 CHAPTER VI- COMMUNITY RELATIONS ................................... 47 CHAPTER VII - VIETNAMESE...MILITARY CIVIC ACTION: Use of preponderantly local national military forces on projects of value to the local populace, at all levels; COMMUNITY ...Civic Action Division took the position that Community Relations was not a function of a Military Civic Action Program and properly belonged in the

  4. Addendum to the corrective action plan for Underground Storage Tanks 1219-U, 1222-U, 2082-U, 2068-U at the Rust Garage Facility, Buildings 9720-15 and 9754-1: Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, Facility ID {number_sign}0-010117

    SciTech Connect

    Not Available

    1994-01-01

    This document represents an addendum to the Corrective Action Plan (CAP) for underground storage tanks 1219-U, 2082-U, and 2068-U located at Buildings 9720-15 and 9754-1, Oak Ridge Y-12 Plant, Oak Ridge, TN. The site of the four underground storage tanks is commonly referred to as the Rust Garage Facility. The original CAP was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review in May 1992. During the time period after submission of the original CAP for the Rust Garage Facility, Y-12 Plant Underground Storage Tank (UST) Program personnel continued to evaluate improvements that would optimize resources and expedite the activities schedule presented in the original CAP. Based on these determinations, several revisions to the original corrective action process options for remediation of contaminated soils are proposed. The revised approach will involve excavation of the soils from the impacted areas, on-site thermal desorption of soil contaminants, and final disposition of the treated soils by backfilling into the subject site excavations. Based on evaluation of the corrective actions with regard to groundwater, remediation of groundwater under the Y-12 Plant CERCLA Program is proposed for the facility.

  5. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    SciTech Connect

    Not Available

    1994-07-01

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan.

  6. System Description for the K-25/K-27 D&D Project Polyurethane Foam Delivery System, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect

    Boris, G.

    2008-02-21

    The Foam Delivery System used in the decontamination and decommissioning (D&D) project for the K-25/K-27 Buildings at the East Tennessee Technology Park (ETTP) is comprised of a trailer-mounted Gusmer{reg_sign} H20/35 Pro-TEC Proportioning Unit and the associated equipment to convey electrical power, air, and foam component material to the unit. This high-pressure, plural-component polyurethane foam pouring system will be used to fill process gas and non-process equipment/piping (PGE/P) within the K-25/K-27 Buildings with polyurethane foam to immobilize contaminants prior to removal. The system creates foam by mixing isocyanate and polyol resin (Resin) component materials. Currently, the project plans to utilize up to six foaming units simultaneously during peak foaming activities. Also included in this system description are the foam component material storage containers that will be used for storage of the component material drums in a staging area outside of the K-25/K-27 Buildings. The Foam Delivery System and foam component material storage enclosures (i.e., Foaming Component Protective Enclosures) used to store polymeric methylene diphenyl diisocyanate (PMDI) component material are identified as Safety Significant (SS) Structures, Systems and Components (SSC) in the Documented Safety Analysis (DSA) for the project, Documented Safety Analysis for the K-25 and K-27 Facilities at the East Tennessee Technology Park, Oak Ridge, Tennessee, DSA-ET-K-25/K-27-0001.

  7. Action Research on Change in Schools: A Collaborative Project.

    ERIC Educational Resources Information Center

    Smulyan, Lisa

    Action research, a term first used in the 1940's by Kurt Lewin, implies the application of tools and methods of social science to immediate, practical problems, with the goals of contributing to theory and knowledge in the field of education and improving practice in the schools. Collaborative action research suggests that each group represented…

  8. Oak Symposium Proceedings

    Treesearch

    Northeastern Forest Experiment Station

    1971-01-01

    As "tall oaks from little acorns grow", the germ of an idea blossomed into this symposium on the five upland oaks. Called simply the "Oak Symposium", that's what it's all about - a meeting to bring together a summation of the advances made on the silviculture, management, and utilization of the upland oaks. Part of this process is the...

  9. Insect damage to oaks

    Treesearch

    Charles O. Rexrode

    1971-01-01

    In terms of mortality caused by insects, defoliators are the most serious enemies of oaks at the present time. An oak leaf tier, Croesia semipurprana, is one of the principal defoliators of trees in the red oak group. Oak leaf rollers, primarily Archips semiferana, have been responsible for widespread mortality in white and...

  10. 76 FR 77301 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... Todd Drive in Dane County, Wisconsin. Those actions grant approvals for the project. The project will... Nesbitt Road to Commerce Park Drive. Stage 2 is currently scheduled for construction from approximately.../14 (Beltline) Whitney Way to Todd Drive, Dane County, Wisconsin, Project ID 1206-07-03. The...

  11. 76 FR 65776 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ...). The actions relate to a proposed highway project, US 41 (Memorial Drive to County M) in Brown County... from Memorial Drive to County M, The project will also reconstruct I-43 from US 41 to Atkinson Drive...-43 via US 41. The project limits on US 41 extend from Memorial Drive to County M, a distance...

  12. Developing Capacity for Social and Emotional Growth: An Action Research Project

    ERIC Educational Resources Information Center

    Doveston, Mary

    2007-01-01

    This article reports an action research project in which children, their teacher and the author, and an advisory teacher from a Local Authority collaborated as co-researchers in a project to improve working relationships in the classroom. Both appreciative enquiry and emancipatory research informed the project. This article focuses on one aspect…

  13. Multiple Intelligences Theory, Action Research, and Teacher Professional Development: The Irish MI Project

    ERIC Educational Resources Information Center

    Hanafin, Joan

    2014-01-01

    This paper presents findings from an action research project that investigated the application of Multiple Intelligences (MI) theory in classrooms and schools. It shows how MI theory was used in the project as a basis for suggestions to generate classroom practices; how participating teachers evaluated the project; and how teachers responded to…

  14. Oak Growth and Response to Thinning

    Treesearch

    Stephen R. Shifley

    2004-01-01

    Oak growth and yield is simultaneously influenced by tree-, stand-, and landscape-scale factors. At the tree scale oak diameter growth varies by tree species (typically n. red oak >= scarlet oak > black oak > white oak > chestnut oak > chinkapin oak > post oak), but oak diameter growth is even more strongly influenced by crown class. Oak stands go...

  15. Site descriptions of environmental restoration units at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Kuhaida, A.J. Jr.; Parker, A.F.

    1997-02-01

    This report provides summary information on Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) sites as listed in the Oak Ridge Reservation Federal Facility Agreement (FFA), dated January 1, 1992, Appendix C. The Oak Ridge National Laboratory was built in 1943 as part of the World War II Manhattan Project. The original mission of ORNL was to produce and chemically separate the first gram-quantities of plutonium as part of the national effort to produce the atomic bomb. The current mission of ORNL is to provide applied research and development in support of the U.S. Department of Energy (DOE) programs in nuclear fusion and fission, energy conservation, fossil fuels, and other energy technologies and to perform basic scientific research in selected areas of the physical, life, and environmental sciences. ER is also tasked with clean up or mitigation of environmental impacts resulting from past waste management practices on portions of the approximately 37,000 acres within the Oak Ridge Reservation (ORR). Other installations located within the ORR are the Gaseous Diffusion Plant (K-25) and the Y-12 plant. The remedial action strategy currently integrates state and federal regulations for efficient compliance and approaches for both investigations and remediation efforts on a Waste Area Grouping (WAG) basis. As defined in the ORR FFA Quarterly Report July - September 1995, a WAG is a grouping of potentially contaminated sites based on drainage area and similar waste characteristics. These contaminated sites are further divided into four categories based on existing information concerning whether the data are generated for scoping or remedial investigation (RI) purposes. These areas are as follows: (1) Operable Units (OU); (2) Characterization Areas (CA); (3) Remedial Site Evaluation (RSE) Areas; and (4) Removal Site Evaluation (RmSE) Areas.

  16. Lights! Camera! Action!: video projects in the classroom.

    PubMed

    Epstein, Carol Diane; Hovancsek, Marcella T; Dolan, Pamela L; Durner, Erin; La Rocco, Nicole; Preiszig, Patricia; Winnen, Caitlin

    2003-12-01

    We report on two classroom video projects intended to promote active student involvement in their classroom experience during a year-long medical-surgical nursing course. We implemented two types of projects, Nursing Grand Rounds and FPBTV. The projects are templates that can be applied to any nursing specialty and can be implemented without the use of video technology. During the course of several years, both projects have proven effective in encouraging students to promote pattern recognition of characteristic features of common illnesses, to develop teamwork strategies, and to practice their presentation skills in a safe environment among their peers. The projects appealed to students because they increased retention of information and immersed students in the experience of becoming experts about an illness or a family of medications. These projects have enabled students to become engaged and invested in their own learning in the classroom.

  17. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  18. 78 FR 62324 - Village of Oak Lawn, Illinois; Notice of Preliminary Determination of a Qualifying Conduit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-16

    ... Energy Regulatory Commission Village of Oak Lawn, Illinois; Notice of Preliminary Determination of a..., Village of Oak Lawn, Illinois (Oak Lawn) filed a notice of intent to construct a qualifying conduit... Hydroelectric Turbine Installation Project would utilize Oak Lawn's water distribution system, and it would be...

  19. Tiger Team Assessment of the Oak Ridge K-25 Site

    SciTech Connect

    Not Available

    1991-12-01

    The Office of Special Projects in the Office of the Assistant Secretary for Environment, Safety, and Health (EH) has the responsibility to conduct Tiger Team Assessments for the Secretary of Energy. This report documents the Tiger Team Assessment of the Oak Ridge K-25 Site (K-25 Site), Oak Ridge, Tennessee. The purpose of the Assessment is to provide the Secretary of Energy with concise information on the: current ES&H compliance status of the Site and the vulnerabilities associated with that compliance status; root causes for noncompliance; adequacy of DOE and site contractor ES&H management programs; adequacy of response actions developed to address identified problem areas; and adequacy of ES&H self-assessments and the institutionalization of the self-assessment process at the K-25 Site.

  20. Tiger Team Assessment of the Oak Ridge K-25 Site

    SciTech Connect

    Not Available

    1991-12-01

    The Office of Special Projects in the Office of the Assistant Secretary for Environment, Safety, and Health (EH) has the responsibility to conduct Tiger Team Assessments for the Secretary of Energy. This report documents the Tiger Team Assessment of the Oak Ridge K-25 Site (K-25 Site), Oak Ridge, Tennessee. The purpose of the Assessment is to provide the Secretary of Energy with concise information on the: current ES H compliance status of the Site and the vulnerabilities associated with that compliance status; root causes for noncompliance; adequacy of DOE and site contractor ES H management programs; adequacy of response actions developed to address identified problem areas; and adequacy of ES H self-assessments and the institutionalization of the self-assessment process at the K-25 Site.

  1. Distance Education in Action: The Wisconsin Rural Reading Improvement Project.

    ERIC Educational Resources Information Center

    Wilsman, Margaret J.

    The Wisconsin Rural Reading Improvement Project implements a research-based telecommunications model of professional development and school improvement that rural school districts can use when redesigning K-12 reading curriculum. The project's approach to staff development assumes that change in school reading programs proceeds via extensive…

  2. Community Service Projects: Citizenship in Action. Fastback 231.

    ERIC Educational Resources Information Center

    Lipka, Richard P.; And Others

    This booklet examines the theory and practice of projects that involve secondary students in community services. Through such involvement, young people will develop positive attitudes toward community participation that will persist throughout their adult lives. Community service projects represent an important and exciting way to bring democracy…

  3. Suicide attempts as social goal-directed systems of joint careers, projects, and actions.

    PubMed

    Valach, Ladislav; Michel, Konrad; Young, R A; Dey, P

    2006-12-01

    In the present study we examined to what extent persons who attempt suicide describe their attempt in terms of social, joint processes. Psychotherapists interviewed 40 patients hospitalized in a general hospital for a few days after an attempted suicide. The content of the interviews was analyzed for the level of systemic processes the patients referred to (that is, action, project, and career). The most common processes to which the patients referred were relationship careers and projects and conflicts and argumentative actions. Our analysis indicates that a social process can be found at all levels of the patient's organization of the suicide attempt, within a system of goal-directed action, project, and career.

  4. Level 3 Baseline Risk Assessment for Building 3515 at Oak Ridge National Lab., Oak Ridge, TN

    SciTech Connect

    Wollert, D.A.; Cretella, F.M.; Golden, K.M.

    1995-08-01

    The baseline risk assessment for the Fission Product Pilot Plant (Building 3515) at the Oak Ridge National laboratory (ORNL) provides the Decontamination and Decommissioning (D&D) Program at ORNL and Building 3515 project managers with information concerning the results of the Level 3 baseline risk assessment performed for this building. The document was prepared under Work Breakdown Structure 1.4.12.6.2.01 (Activity Data Sheet 3701, Facilities D&D) and includes information on the potential long-term impacts to human health and the environment if no action is taken to remediate Building 3515. Information provided in this document forms the basis for the development of remedial alternatives and the no-action risk portion of the Engineering Evaluation/Cost Analysis report.

  5. Climatic Action Plan Project for the state of Veracruz (Mexico)

    NASA Astrophysics Data System (ADS)

    Tejeda, A.; Ochoa, C.

    2007-05-01

    With financing of the British Government and support of the National Institute of Ecology, from April of 2006 to March of 2008 an action plan which intends variability effects and climatic change for the state of Veracruz will be made. This plan will be taken to the state government and will be spread out to manufacturers, industrialists and population. Throughout the Gulf of Mexico, the state of Veracruz is a 745 km coast in length with a width that goes from 156 km in the center to 47 km in the north. The state has large mountains, forests, plains, rivers, cascades, lagoons and coasts. Veracruz is the 10th largest state in Mexico with a 72,420 km2 surface, it is located between 17°00' and 22°28' north latitude and between 93°95' and 98°38' west longitude. Because of the orographic effect, the Sierra Madre Oriental causes the existence of many types of climate, from dry to tropical forest, going through snow on the top of the Pico de Orizaba (5747m of altitude). The wind affects the coasts by not allowing to fish during a hundred days a year (particularly in winter), and on summer tropical waves and occasionally hurricanes affect rivers causing overflow and urban floods in fields. These phenomena do not have a regular affectation; they are subject to climate variability effects. Veracruz is the third state with most population in the country (7.1 million people in 2005), only surpassed by the state of Mexico and Mexico City. Although it occupies 3.7% of the national territory, Veracruz has 6.9% of human population in the country, and is the 6th state of PIB national contribution (240 thousands of millions pesos approximately). Of the possible effects of the climatic change the following can be expected: , , : Most of the coasts of the Gulf of Mexico, low and sandy, less of a meter on the sea level, represent the most vulnerable territory of Veracruz. Towns will be affected, the saline water will infiltrate until the phreatic mantles and the coast electrical

  6. Quality Assurance Project Plan for the treatability study of in situ vitrification of Seepage Pit 1 in Waste Area Grouping 7 at Oak Ridge National Laboratory

    SciTech Connect

    1995-07-01

    This Quality Assurance Project Plan (QAPjP) establishes the quality assurance procedures and requirements to be implemented for the control of quality-related activities for Phase 3 of the Treatability Study (TS) of In Situ Vitrification (ISV) of Seepage Pit 1, ORNL Waste Area Grouping 7. This QAPjP supplements the Quality Assurance Plan for Oak Ridge National Laboratory Environmental Restoration Program by providing information specific to the ISV-TS. Phase 3 of the TS involves the actual ISV melt operations and posttest monitoring of Pit 1 and vicinity. Previously, Phase 1 activities were completed, which involved determining the boundaries of Pit 1, using driven rods and pipes and mapping the distribution of radioactivity using logging tools within the pipes. Phase 2 involved sampling the contents, both liquid and solids, in and around seepage Pit 1 to determine their chemical and radionuclide composition and the spatial distribution of these attributes. A separate QAPjP was developed for each phase of the project. A readiness review of the Phase 3 activities presented QAPjP will be conducted prior to initiating field activities, and an Operational Acceptance, Test (OAT) will also be conducted with no contamination involved. After, the OAT is complete, the ISV process will be restarted, and the melt will be allowed to increase with depth and incorporate the radionuclide contamination at the bottom of Pit 1. Upon completion of melt 1, the equipment will be shut down and mobilized to an adjacent location at which melt 2 will commence.

  7. Corrective action investigation plan for Project Shoal Area CAU No. 416

    SciTech Connect

    1996-08-01

    This Corrective Action Investigation Plan (CAIP) is part of an ongoing US Department of Energy (DOE)-funded project for the investigation of Corrective Action Unit (CAU) No. 416, Project Shoal Area (PSA). Project Shoal was conducted to determine whether seismic waves produced by underground nuclear testing could be differentiated from naturally occurring earthquakes. The PSA site is located approximately 30 miles southeast of Fallon, Nevada, in the northern portion of Sand Springs Mountains in Churchill County. This CAIP will be implemented in accordance with the Federal Facility Agreement and Consent Order, the Industrial Sites Quality Assurance Project Plan, and all applicable Nevada Division of Environmental Protection policies and regulations.

  8. Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)

    2001-01-01

    This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

  9. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    SciTech Connect

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  10. Report: Assessment of EPA’s Projected Pollutant Reductions Resulting from Enforcement Actions and Settlements

    EPA Pesticide Factsheets

    Report #2007-B-00002, July 24, 2007. The accuracy and reliability of EPA’s projected pollutant reductions for Fiscal Years 2003-2006 were dependent on the specific program in which the enforcement action took place.

  11. Scoping session of the programmatic environmental impact statement for the uranium mill tailings remedial action project

    SciTech Connect

    Not Available

    1992-12-08

    This report contains documentation of the scoping session of the environmental impact statement for the Uranium Mill Tailings Remedial Action Project. The purpose of the meeting was to talk about the Programmatic Environmental Impact Statement on the groundwater.

  12. Using Action Research Projects to Examine Teacher Technology Integration Practices

    ERIC Educational Resources Information Center

    Dawson, Kara

    2012-01-01

    This study examined the technology integration practices of teachers involved in a statewide initiative via one cycle of action research. It differs from other studies of teacher technology integration practices because it simultaneously involved and provided direct benefits to teachers and researchers. The study used thematic analysis to provide…

  13. The School As Center of Inquiry. An Action Research Project.

    ERIC Educational Resources Information Center

    Williams, Marium T.

    This paper presents findings of an action-research study that examined the characteristics of schools in eastern Kentucky that were recognized as effective by the State Department of Education. Eighteen students who were in an educational leadership class at Morehead State University, and who held teaching or administrative positions in Kentucky…

  14. Teacher-Student Negotiation in an Action Research Project

    ERIC Educational Resources Information Center

    Tsafos, Vassilis

    2009-01-01

    Students in Greece are required to study classical texts, a task often challenging both for them and for their teachers. In this article, a teacher action researcher describes how he explored ways to enhance student engagement in the required reading. By negotiating the task of indexing, a process where students go through the text collecting…

  15. Action Research Projects in Distance Education: A Manual.

    ERIC Educational Resources Information Center

    Ramakrishna, C. Pushpa; Prasad, V. S.

    This manual, prepared by the Distance Education Council (India) presents guidelines for action research in distance education, balancing practical research activities with a sound theoretical research base. Chapter 1, "Scope, Purpose and Design of the Manual," suggests several definitions of research; draws distinctions between academic…

  16. Enhancing Students' Creative Writing Skills: An Action Research Project

    ERIC Educational Resources Information Center

    Nasir, Laraib; Naqvi, Syeda Meenoo; Bhamani, Shelina

    2013-01-01

    This research aimed to improve written expression (composition) skills of 5th grade students of an elite private school. The research was designed under the paradigm of action research. A total sample of 39 students' from the same grade was chosen for the study. The baseline assessment was carried out to explore the pre-intervention writing skill…

  17. Children's Ideas about Animal Adaptations: An Action Research Project

    ERIC Educational Resources Information Center

    Endreny, Anna Henderson

    2006-01-01

    In this paper, I describe the action research I conducted in my third-grade science classrooms over the course of two years. In order to gain an understanding of my third-grade students' ideas about animal adaptations and how the teaching of a unit on crayfish influenced these ideas, I used clinical interviews, observations, and written…

  18. Creative Pedagogies and Collaboration: An Action Research Project

    ERIC Educational Resources Information Center

    Kuntz, Aaron M.; Presnall, Marni M.; Priola, Maria; Tilford, Amy; Ward, Rhiannon

    2013-01-01

    This action research study involves nine elementary school teacher-researchers, one university faculty member, and one graduate student engaged in developing creative pedagogical practices in one elementary school in an urban school in Alabama, USA. Participants found that a teacher's experience of agency and their ability to work creatively…

  19. Partnership for healthy living: an action research project.

    PubMed

    Gallagher, Louise P; Truglio-Londrigan, Marie; Levin, Rona

    2009-01-01

    The purpose of this study was to develop and evaluate an advanced practice nurse case-management intervention programme in a US senior citizen community centre. Researchers Louise Gallagher, Marie Truglio-Londrigan and Rona Levin used a participatory action research method and found that a number of themes emerged to guide nursing interventions.

  20. The Constant Cycle: Day to Day Critical Action of the QUIPPED Project

    ERIC Educational Resources Information Center

    Medves, Jennifer M.; Paterson, Margo; Schroder, Cori; Verma, Sarita; Broers, Teresa; Chapman, Christine; O'Riordan, Anne

    2008-01-01

    Action research in the critical paradigm involves a process of continual refection in and on action including the research process itself. In the second in a series of several papers we report on the day-to-day management of the QUIPPED project. The aim was to facilitate patient centred care through inter-professional collaboration with health…

  1. The Constant Cycle: Day to Day Critical Action of the QUIPPED Project

    ERIC Educational Resources Information Center

    Medves, Jennifer M.; Paterson, Margo; Schroder, Cori; Verma, Sarita; Broers, Teresa; Chapman, Christine; O'Riordan, Anne

    2008-01-01

    Action research in the critical paradigm involves a process of continual refection in and on action including the research process itself. In the second in a series of several papers we report on the day-to-day management of the QUIPPED project. The aim was to facilitate patient centred care through inter-professional collaboration with health…

  2. Critical Literacy Practices, Social Action Projects, and the Reader Who Struggles in School

    ERIC Educational Resources Information Center

    Bauer, Courtney Marie

    2011-01-01

    This study, conducted at an urban public school, explored the engagements of five, fourth grade, African American students who struggled with reading in school as they participated in critical literacy practices and social action projects with the assumption that critical analysis of written texts and concrete social actions were necessary for…

  3. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    SciTech Connect

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

  4. Empowering Students through a Social-Action Writing Project

    ERIC Educational Resources Information Center

    Mancina, Hannah

    2005-01-01

    Capitalizing on students' interest in a local newspaper story, a research and writing project is developed that resulted in ninth-grade students finding their voice and power through writing. Although not being able to see the impact of their writing on their audiences, the students felt the impact of being given the respected distinction of…

  5. Blended Learning and Teaching Writing: A Teacher Action Research Project

    ERIC Educational Resources Information Center

    Camahalan, Faye Marsha G.; Ruley, Andrea G.

    2014-01-01

    This teacher research project focused on utilizing blended learning to teach writing to middle school students. The intervention was designed to fit into individual lessons needed to improve students' writing skills with the main focus on sentence structure. Sixteen (16) 7th grade students were assessed with a writing sample applying the new…

  6. The Charlotte Action Research Project: A Model for Direct and Mutually Beneficial Community-University Engagement

    ERIC Educational Resources Information Center

    Morrell, Elizabeth; Sorensen, Janni; Howarth, Joe

    2015-01-01

    This article describes the evolution of the Charlotte Action Research Project (CHARP), a community-university partnership founded in 2008 at the University of North Carolina at Charlotte, and focuses particularly on the program's unique organizational structure. Research findings of a project evaluation suggest that the CHARP model's unique…

  7. Taking Action: An Educator's Guide to Involving Students in Environmental Projects

    ERIC Educational Resources Information Center

    Council for Environmental Education, 2012

    2012-01-01

    Developed in cooperation with the World Wildlife Fund, "Taking Action" inspires ideas and provides models for conducting effective environmental projects--projects that dynamically engage students from start to finish. From adopting species to protecting habitats to saving energy and creating publications, this guide will help educators plan,…

  8. What Is My Role? Establishing Teacher and Youth Worker Responsibilities in Social Action Projects

    ERIC Educational Resources Information Center

    Epstein, Shira Eve

    2013-01-01

    In this research, I analyze the roles of teachers and youth workers from a community-based organization in the context of two high school social action projects. Both the teachers and the youth workers assumed distinct roles while working together during the civic project enactments. The teachers were largely positioned as responsible for…

  9. Learning about Democracy at School: An Action Research Project in Early Childhood Education

    ERIC Educational Resources Information Center

    Sánchez-Blanco, Concepción

    2015-01-01

    This article examines part of an action research project carried out in a Spanish public school. We explain the complex reality of an early childhood education classroom. Focusing on early childhood education, the project was developed in collaboration with a teacher from one of the classrooms of four year olds. Several of the children in the…

  10. Full Circle: Stakeholders' Evaluation of a Collaborative Enquiry Action Research Literacy Project

    ERIC Educational Resources Information Center

    Forey, Gail; Firkins, Arthur S.; Sengupta, Sima

    2012-01-01

    This paper reports on school-university collaboration during an action research project, which aimed to build a writing pedagogy for students with Learning Disabilities in the trilingual, biliterate educational context of Hong Kong. The project was established through interpersonal relationships built from the ground up between stakeholders from a…

  11. Library Spaces for Urban, Diverse Commuter Students: A Participatory Action Research Project

    ERIC Educational Resources Information Center

    Brown-Sica, Margaret S.

    2012-01-01

    A data-gathering project using elements of Participatory Action Research was conducted at the Auraria Library, which serves the University of Colorado Denver, the Metropolitan State College of Denver and the Community College of Denver. The project was administered in order to shape a plan to develop a Learning Commons environment at the library.…

  12. Actionable Data Projects: Social Science and Service-Learning in General Education Courses

    ERIC Educational Resources Information Center

    Maloyed, Christie L.

    2016-01-01

    The use of service-learning pedagogies in general education courses is often limited to increasing volunteerism or civic literacy with problem-based or research-based projects reserved for upper level courses. This article examines the implementation of an "actionable data" service-learning project in an introductory, general studies…

  13. Taking Action: An Educator's Guide to Involving Students in Environmental Projects

    ERIC Educational Resources Information Center

    Council for Environmental Education, 2012

    2012-01-01

    Developed in cooperation with the World Wildlife Fund, "Taking Action" inspires ideas and provides models for conducting effective environmental projects--projects that dynamically engage students from start to finish. From adopting species to protecting habitats to saving energy and creating publications, this guide will help educators plan,…

  14. Library Spaces for Urban, Diverse Commuter Students: A Participatory Action Research Project

    ERIC Educational Resources Information Center

    Brown-Sica, Margaret S.

    2012-01-01

    A data-gathering project using elements of Participatory Action Research was conducted at the Auraria Library, which serves the University of Colorado Denver, the Metropolitan State College of Denver and the Community College of Denver. The project was administered in order to shape a plan to develop a Learning Commons environment at the library.…

  15. Actionable Data Projects: Social Science and Service-Learning in General Education Courses

    ERIC Educational Resources Information Center

    Maloyed, Christie L.

    2016-01-01

    The use of service-learning pedagogies in general education courses is often limited to increasing volunteerism or civic literacy with problem-based or research-based projects reserved for upper level courses. This article examines the implementation of an "actionable data" service-learning project in an introductory, general studies…

  16. Journeying between the Education and Hospital Zones in a Collaborative Action Research Project

    ERIC Educational Resources Information Center

    Crow, Jayne; Smith, Lesley; Keenan, Iain

    2006-01-01

    The authors present their journey through the development of an action research project based on collaboration between university health lecturers and a practice development and research nurse in an NHS Trust hospital. The project was designed to raise awareness and improve the practice of all staff in relation to the dignity and respect shown to…

  17. 77 FR 75254 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... actions relate to a proposed highway and transit project within the Tier 2 Elgin O'Hare--West Bypass project corridor, which is located along the Elgin-O'Hare Expressway/Thorndale ] Avenue between Chicago O'Hare International Airport (O'Hare) and Lake Street/US Route 20, and on a proposed alignment...

  18. With Hindsight: An Overview of the Autism Spectrum Disorder Participatory Action Research Project

    ERIC Educational Resources Information Center

    Curzon, Joanna

    2008-01-01

    Much has happened since nine teams across New Zealand engaged in a Ministry of Education-funded participatory action research project looking at effective practice for supporting children and young people with autism spectrum disorder (ASD) in education. Building on earlier discussions, the project ran from 2002 to 2004, and until now the story…

  19. Enhancing the Undergraduate Student Experience via Fund-Raising Partnerships: An Action Research Project

    ERIC Educational Resources Information Center

    Thorley, Wendy; Marjoribanks, Bruce; Kranz, Julian

    2014-01-01

    This project was developed from practitioner action research and considers the impact of integrating fund-raising activities into the formal curriculum with a target group of undergraduate students. The main aim of this project was to evaluate the impact of developing fund-raising activities as an integral aspect at both module and programme…

  20. Enhancing the Undergraduate Student Experience via Fund-Raising Partnerships: An Action Research Project

    ERIC Educational Resources Information Center

    Thorley, Wendy; Marjoribanks, Bruce; Kranz, Julian

    2014-01-01

    This project was developed from practitioner action research and considers the impact of integrating fund-raising activities into the formal curriculum with a target group of undergraduate students. The main aim of this project was to evaluate the impact of developing fund-raising activities as an integral aspect at both module and programme…

  1. Realising dignity in care home practice: an action research project.

    PubMed

    Gallagher, Ann; Curtis, Katherine; Dunn, Michael; Baillie, Lesley

    2017-06-01

    More than 400,000 older people reside in over 18,000 care homes in England. A recent social care survey found up to 50% of older people in care homes felt their dignity was undermined. Upholding the dignity of older people in care homes has implications for residents' experiences and the role of Registered Nurses. The study aimed to explore how best to translate the concept of dignity into care home practice, and how to support this translation process by enabling Registered Nurses to provide ethical leadership within the care home setting. Action research with groups of staff (Registered Nurses and non-registered caregivers) and groups of residents and relatives in four care homes in the south of England to contribute to the development of the dignity toolkit. Action research groups were facilitated by 4 researchers (2 in each care home) to discuss dignity principles and experiences within care homes. These groups reviewed and developed a dignity toolkit over six cycles of activity (once a month for 6 months). The Registered Nurses were individually interviewed before and after the activity. Hard copy and online versions of a dignity toolkit, with tailored versions for participating care homes, were developed. Registered Nurses and caregivers identified positive impact of making time for discussion about dignity-related issues. Registered Nurses identified ongoing opportunities for using their toolkit to support all staff. Nurses and caregivers expressed feelings of empowerment by the process of action research. The collaborative development of a dignity toolkit within each care home has the potential to enable ethical leadership by Registered Nurses that would support and sustain dignity in care homes. Action research methods empower staff to maintain dignity for older people within the care home setting through the development of practically useful toolkits to support everyday care practice. Providing opportunities for caregivers to be involved in such

  2. Project CHECO Southeast Asia Report. USAF Civic Action in Thailand

    DTIC Science & Technology

    1969-03-22

    rabies control program had been launched by Thai and USAF veterinary personnel in Udon Thani . This pilot project was similar to those conducted in t~e...9 UNCLASSIFIED j NCLASSIFIEO the summer of that year Located at Ubon, Udon Thani , and Khon Kaen, these were jointly manned by Thai and USAF...which had been created when an American was suspected of killing an Udorn prostitute. Offi~ cials of the Udon Thani -.ctde School.participated in the

  3. UMTRA Ground Water Project management action process document

    SciTech Connect

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards.

  4. Project HealthDesign: enhancing action through information.

    PubMed

    Brennan, Patricia Flatley; Casper, Gail; Downs, Stephen; Aulahk, Veenu

    2009-01-01

    Project HealthDesign is a country-wide initiative in the United States designed to stimulate innovation in personal health records (PHRs). Nine grantee teams engaged in an 18-month long design and prototyping process. Two teams addressed the needs of children and adolescents; three created novel approaches to help adults prevent or manage metabolic syndrome; three groups employed interface innovations to assist patients with chronic care management and one team devised a novel calendaring system to assist patients undergoing complex medical/surgical treatments to integrate care processes into their daily lives. These projects not only included development and testing of novel personal health records applications, but also served as the starting point to specify and implement a common technical core platform. The project advanced PHR development in two key ways: intensive user-centered design and a development architecture that separates applications of PHRs from the infrastructure that supports them. The initiative also allowed systematic investigation of significant ethical, legal and social issues, including how privacy considerations are changed when information technology innovations are used in the home and the rebalancing of the authority structure of health care decision making when patient-centered approaches guide the design of PHRs.

  5. People and oaks

    Treesearch

    Paul F. Starrs

    2015-01-01

    While technical knowledge of oaks, acorns, habitat, wildlife, and woodland environments is evolving and a sought-after field of study, there are profound linkages, at once humanistic and artistic, where it comes to people and oaks. Looking at six distinct facets of humans and oak woodlands, this essay suggests that the bonds of people to place can be mediated by the...

  6. Guidance document for the preparation of waste management plans for the Environmental Restoration Program at Oak Ridge National Laboratory. Environmental Restoration Program

    SciTech Connect

    Clark, C. Jr.

    1993-07-01

    A project waste management (WM) plan is required for all Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program remedial investigation, decommission and decontamination (D&D), and remedial action (RA) activities. The project WM plan describes the strategy for handling, packaging, treating, transporting, characterizing, storing, and/or disposing of waste produced as part of ORNL ER Program activities. The project WM plan also contains a strategy for ensuring worker and environmental protection during WM activities.

  7. Project to policy: TUFH principles in action in Australia.

    PubMed

    Cameron, Ian; Matic, Vlad; Mathews, Richard

    2007-08-01

    In 1999, Towards Unity For Health developed principles for patient-based health systems which included partnerships, raising the level of partnerships, integration of individual, population and public health, information management and measurement of outcomes. To address the health workforce crisis in an area of remote north western New South Wales (NSW) in Australia. The NSW Rural Doctors Network applied the TUFH principles in overcoming much of the crisis and developing an ongoing local health system which has answered many of the local needs. The project provided experience for policy change and development at both State and National levels.

  8. Special Project to Train Action Researchers and Trainers of Action Research Collaborators. Final Report.

    ERIC Educational Resources Information Center

    Mial, Dorothy

    A gap exists between new knowledge in education and change in practice; it calls for trained personnel to link the activities of school staffs and social scientists. Thus the objective of this special project is to improve methods of training change agents to improve classroom and school management practices. The 1966 programs involved 2 groups:…

  9. Cable Splicing Project/Maintenance Action AFSC 361X1

    DTIC Science & Technology

    1991-01-01

    standards for subordinates 53 D88 Evaluate progress of trainees 53 C55 Evaluate project drawings or specifications 52 25 LU - - K LUJ -x cr O L z nmtjCiCJ...0U co 0 ~ U). m u.. L -a cU+ 0. mL-~ S- 4-- CO x E S- Ln O : .0 0 *- u CL K ~ 0 a> ) C_ UL S.- (v a) nU -r Ln CA CU - S 0.- o ) a 04 0 - W -0 I_- -3...CU U) u cL E- U O D U)c -0 E a) .- (4--C-LA - S- a ) C - U )r - s- UU U 0..a’oIz K CU .- c () LL 0 U - a~ )U 0 . ’-C CU’ca) 4- --=DS- C -- D-C > 4-0

  10. Source modification special study. [Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1989-04-01

    One of the major issues that must be addressed during the evaluation of the efficiency of tailings embankment designs for compliance with groundwater standards is the estimation of source concentrations and the change in these concentrations with time. Because any effort to predict concentrations of contaminants in the uppermost aquifer requires a source concentration, data from these analyses are essential. Thetechnical approach of this study was twofold. The first approach was to investigate the rates of natural flushing of contaminants. Two sets of tailings samples were collected at two sites on the Old Rifle tailings pile at the Rifle UMTRA Project site in Colorado. One set of samples was collected at a site where the lower portion of the profile is continuously inundated with water and the other set was collected in anarea that only receives water from precipitation. The tailings samples were refluxed in strong acid (nitric acid) and the leachate was analyzed for hazardous constituents. The results of this investigation indicate that many of the hazardous constituents have been leached from the tailings at the wet site and that there has been little redistribution of elemental hazardous constituents at the dry site. The second approach involved a laboratory investigation of contaminant removal from tailings by doubly distilled water and two lixiviants. Tailings samples from the Gunnison, Colorado, UMTRA Project site were subjected to leaching by doubly distilled water, and by the lixiviants sodium bicarbonate and disodium ethylenediaminetetraacetic acid. The resulting data were tabulated and plotted with concentration as a function of pore volume. Evaluation of the data indicates that pore fluids should show a decrease in concentration after very few pore volumes of liquid have eluted through the tailings. It is also demonstrated that lixiviants significantly increase the solubility and rate of elution of all of the hazardous constituents.

  11. Individual Action and Community Context: The Health Intervention Project

    PubMed Central

    Sterk, Claire E.; Elifson, Kirk W.; Theall, Katherine P.

    2007-01-01

    Background HIV risk-reduction efforts have traditionally focused on the individual. The need for including the role of the social context and community addition is being recognized. Social capital provides social relationships and potential resources that may hinder or trigger risk or protective health behaviors, especially for individuals with limited economic means. Methods Sixty-five adult inner-city drug using women, who were included in a woman-focused HIV risk reduction intervention trial, participated in in-depth interviews in Atlanta, GA between 2002 and 2004. The interviews focused on the women's individual behavioral change during the six months since completion of the intervention as well as on the impact of community conditions. Topics discussed were sexual and drug use behaviors, social relationships, social capital, and community physical and social infrastructure. The data were analyzed using the constant comparison methods. Results The respondents indicated the poor physical and social infrastructure led to alienation and negatively impacted their behavioral change efforts. Social capital and social support mediated these negative influences. Drug related violence was an especially debilitating in their efforts to reduce HIV risk associated with crack cocaine or injection drug use and associated sexual behavior. Environmental conditions and opportunity structures played salient roles in the women's success. Conclusions Individual actions and community context must be considered simultaneously when facilitating and assessing behavioral interventions. PMID:17543709

  12. Oak Ridge National Laboratory Management & Integration Perspective Subcontractors as Partners in Site Restoration

    SciTech Connect

    Brill, A.; Eidam, G.

    2002-02-26

    In 1997, the U. S. Department of Energy (DOE) Oak Ridge Operations (ORO) Office awarded the Management and Integration (M&I) contract for all five of their Oak Ridge Operations facilities to Bechtel Jacobs Company, LLC (BJC). This paper will focus on the success and challenges of several of the M&I projects at the Oak Ridge National Laboratory (ORNL). The initial goals for BJC were to transition up to 93% of their staff to the subcontract community as they moved away from operations to ''integration.'' The perspectives of BJC and one of their Remedial Action/Decontamination & Decommissioning (RADD) subcontractors will be combined in this paper to share with others how ''partnering'' together was essential for success. Projects completed by Safety and Ecology Corporation (SEC) under their RADD subcontract will be used to illustrate the process and the challenges/successes to completion. These projects will include pond remediation, tank remediation, and building cleanup for reuse. All these projects were ''fixed price'' with defined milestones keyed into award fee for BJC and regulatory milestones for DOE. By working together to form integrated teams focused on site remediation without sacrificing safety, all milestones were met. This paper will discuss the following items associated with the M&I environmental restoration projects at ORNL: overview of the M&I Contract; challenges in transitioning from ''operations'' to ''integration''; subcontracting strategies; subcontractor pre-qualification process; overview of ORNL Projects; and integrated team effort required to achieve site restoration goals.

  13. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  14. Oak Ridge callibration recall program

    SciTech Connect

    Falter, K.G.; Wright, W.E.; Pritchard, E.W.

    1996-12-31

    A development effort was initiated within the Oak Ridge metrology community to address the need for a more versatile and user friendly tracking database that could be used across the Oak Ridge complex. This database, which became known as the Oak Ridge Calibration Recall Program (ORCRP), needed to be diverse enough for use by all three Oak Ridge facilities, as well as the seven calibration organizations that support them. Various practical functions drove the initial design of the program: (1) accessible by any user at any site through a multi-user interface, (2) real-time database that was able to automatically generate e-mail notices of due and overdue measuring and test equipment, (3) large memory storage capacity, and (4) extremely fast data access times. In addition, the program needed to generate reports on items such as instrument turnaround time, workload projections, and laboratory efficiency. Finally, the program should allow the calibration intervals to be modified, based on historical data. The developed program meets all of the stated requirements and is accessible over a network of computers running Microsoft Windows software.

  15. Oak Ridge National Laboratory Technology Logic Diagram. Indexes

    SciTech Connect

    Not Available

    1993-09-01

    The Decontamination and Decommissioning (D&D) Index provides a comprehensive list of site problems, problem area/constituents, remedial technologies, and regulatory terms discussed in the D&D sections of the Oak Ridge National Laboratory Technology Logic Diagram. All entries provide specific page numbers, or cross-reference entries that provide specific page numbers, in the D&D volumes (Vol. 1, Pt. A; Vol. 2, Pt. A; and appropriate parts of Vol. 3). The Oak Ridge National Laboratory Technology (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) and waste management (WM) problems at Oak Ridge National Laboratory (ORNL) to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed to develop these technologies to a state that allows technology transfer and application to decontamination and decommissioning (D&D), remedial action (RA) and WM activities. It is essential that follow-on engineering studies be conducted to build on the output of this project. These studies will begin by selecting the most promising technologies identified in the TLD and finding an optimum mix of technologies that will provide a socially acceptable balance between cost and risk.

  16. Corrective action baseline report for underground storage tanks 0439-U, 0440-U, 2073-U, 2074-U, and 2075-U at the East End Fuel Station, Buildings 9754 and 9754-2, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, Facility ID No. 0-010117

    SciTech Connect

    Not Available

    1994-01-01

    The purpose of this report is to provide baseline geochemical and hydrogeologic data relative to corrective action for underground storage tanks (USTs) 0439-U, 0440-U, 2073-U, 2074-U, and 2075-U at the East End Fuel Station, Buildings 9754 and 9754-2 at the Oak Ridge Y-12 Plant. Progress in support of corrective action at the East End Fuel Station has included monitoring well installation, tank removal, and baseline groundwater sampling and analysis. This document represents the baseline report for corrective action at the East End Fuel Station and is organized into three sections. Section 1 presents introductory information relative to the site, including the regulatory initiative, site description, and progress to date. Section 2 includes a summary of additional monitoring well installation activities, the results of baseline groundwater sampling, a summary of tank removal activities, and the results of confirmatory soil sampling performed during tank removal. Section 3 presents the baseline hydrogeology and planned zone of influence for groundwater remediation.

  17. Mercury issues related to NPDES and the CERCLA watershed project at the Oak Ridge Y-12 Plant

    SciTech Connect

    1996-11-01

    The purpose of this document is to present the current understanding of the issues and options surrounding compliance with the current National Pollutant Discharge Elimination System (NPDES) permit conditions. This is a complicated issue that directly impacts, and will be directly impacted by, ongoing CERCLA activities in Lower East Fork Poplar Creek and the Clinch River/Poplar Creek. It may be necessary to reconstitute the whole and combine actions and decisions regarding the entire creek (origin to confluence with the Clinch River) to develop a viable long-term strategy that meets regulatory goals and requirements as well as those of DOE`s 10-Year Plan and the new watershed management permitting approach. This document presents background information on the Reduction of Mercury in Plant Effluents (RMPE) and NPDES programs insofar as it is needed to understand the issues and options. A tremendous amount of data has been collected to support the NPDES/RMPE and CERCLA programs. These data are not presented, although they may be referenced and conclusions based on them may be presented, as necessary, to support discussion of the options.

  18. Calculation of the number of cancer deaths prevented by the Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    Miller, M.L.; Pomatto, C.B. ); Cornish, R.E. . Albuquerque Operations Office)

    1999-05-01

    The Uranium Mill Tailings Remedial Action Project has completed remedial action at 22 uranium mill tailings sites and about 5,000 properties (vicinity properties) where tailings were used in construction, at a total cost of $1.45 billion. This paper uses existing data from Environmental Impact Statements and Environmental Assessments, and vicinity property calculations, to determine the total number of cancer deaths averted by the Uranium Mill Tailings Remedial Action Project. The cost-effectiveness of remediating each site, the vicinity properties, and the entire project is calculated. The cost per cancer death averted was four orders of magnitude higher at the least cost-effective site than at the most cost-effective site.

  19. Calculation of the number of cancer deaths prevented by the Uranium Mill Tailings Remedial Action Project.

    PubMed

    Miller, M L; Cornish, R E; Pomatto, C B

    1999-05-01

    The Uranium Mill Tailings Remedial Action Project has completed remedial action at 22 uranium mill tailings sites and about 5,000 properties ("vicinity properties") where tailings were used in construction, at a total cost of $1.45 billion. This paper uses existing data from Environmental Impact Statements and Environmental Assessments, and vicinity property calculations, to determine the total number of cancer deaths averted by the Uranium Mill Tailings Remedial Action Project. The cost-effectiveness of remediating each site, the vicinity properties, and the entire project is calculated. The cost per cancer death averted was four orders of magnitude higher at the least cost-effective site than at the most cost-effective site.

  20. Hospital attitudes: preliminary findings from donor action pilot projects.

    PubMed

    Wight, C; Cohen, B; Miranda, B; Fernandez, M; Beasley, C

    1998-01-01

    As part of the Donor Action collaboration (Eurotransplant Foundation, The Netherlands; Organización National de Transplantes, Spain; and The Partnership for Organ Donation, USA), a hospital survey was administered to gather baseline data on staff attitudes about organ donation and level of self-reported skills/confidence in performing a range of organ donation roles. A standard survey instrument was administered in two hospitals in Spain, two in The Netherlands and one in the UK. In four hospitals the survey was administered to all ICU staff; in one hospital it was administered to a random sample of hospital staff. The instrument was created in English, and translated into Spanish and Dutch for the hospitals in each country. Data were analysed by country and showed consistently strong perceptions that organ donation saves lives (97%). Support for donation (95%) and willingness to donate one's own organs (82%) were high in all three country samples. Significant differences in belief were observed when respondents were asked whether they agreed that organ donation helps families with their grief. The UK respondents were more likely to agree (57%), with lower levels of agreement in Spain (47%) and The Netherlands (14%) (P < 0.0001). Average ratings of skills/confidence were highest for notifying the transplant coordinator (49%) and comforting the family (48%) with lower confidence reported regarding explaining brain death (34%), introducing organ donation (32%), and requesting organ donation (26%). Ratings varied widely across countries with UK respondents expressing the highest level of self-reported confidence, and Spanish respondents the lowest level. For example, 77% of UK respondents reported themselves skilled/confident explaining brain death, versus 47% of Dutch respondents and 11% of Spanish respondents (P < 0.0001). Similar results were seen regarding requesting organ donation: UK 53%; The Netherlands 30%; Spain 13% (P < 0.0001). There has been a lack of

  1. 77 FR 65929 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... the following highway project in the State of New York: Tappan Zee Hudson River Crossing Project... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River.... Sec. 139(l)(1). The actions relate to the Tappan Zee Hudson River Crossing Project located in Rockland...

  2. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    SciTech Connect

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  3. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    SciTech Connect

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  4. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1992-12-31

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

  5. [Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan]. Revision 4

    SciTech Connect

    Not Available

    1992-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

  6. Success factors for international HTA projects: evaluating EUnetHTA Joint Action as an exemplar.

    PubMed

    Guegan, Eleanor Woodford; Cook, Andrew

    2014-11-01

    Evaluation is essential for the management of international projects or networks in health technology assessment (HTA). It extends beyond the normal process of project management by incorporating qualitative dimensions and provides information about a project's effectiveness and achievements. This article aimed to identify the factors that are important for the success of international HTA projects. The European network for Health Technology Assessment Joint Action (EUnetHTA JA) is presented as an exemplar. METHODS for the evaluation of international HTA projects include interviews, focus groups, questionnaires, observations and documentary review, and the key points of these approaches have been summarized. The impact and effectiveness of the EUnetHTA JA was evaluated by questionnaires of project participants and external stakeholders, and by documentary review. The response rate for the three annual questionnaires sent to project participants ranged from 86 percent to 88 percent and for external stakeholders ranged from 65 percent to 88 percent. Key factors for project success included production of deliverables according to the workplan, achievement of objectives, added value generated, effective communication, involvement of external stakeholders, workstream management and progress from the preceding EUnetHTA 2006-2008 project. The experience of this project can inform the evaluation of future international HTA collaborations, such as the EUnetHTA 2nd Joint Action and HTAsiaLink. A high response rate was achieved to the self-completion questionnaires and the strategy followed is recommended for evaluation of international HTA projects. Future assessments of international HTA projects should strive to measure outcomes and impact, not just outputs and process.

  7. 75 FR 51450 - Notice of 229 Boundary Revision for the Oak Ridge National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... of 229 Boundary Revision for the Oak Ridge National Laboratory AGENCY: Department of Energy (DOE). ACTION: Notice of 229 Boundary Revision for the Oak Ridge National Laboratory. SUMMARY: Notice is hereby... facilities of the Oak Ridge National Laboratory of the United States Department of Energy. The following...

  8. Streamlined approach for environmental restoration plan for corrective action unit 416, Mud Pit, Project Shoal Area

    SciTech Connect

    1997-07-01

    This plan addresses the actions necessary for the restoration and closure of the Project Shoal Area (PSA), Surface Corrective Action Unit (CAU) 416, Mud Pit (Corrective Action Site No. 57-09-01), a pit that was used to store effluent produced during drilling of the Post-Shot Borehole PS-1 in 1963. This plan describes the activities that will occur at the site and the steps that will be taken to gather enough data to obtain a notice of completion from the Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented with the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996) and the Industrial Sites Quality Assurance Project Plan (DOE/NV, 1994). The SAFER process is being employed at this CAU where enough information exists about the nature and extent of contamination to propose an appropriate corrective action without completing a Corrective Action Decision Document and Corrective Action Plan. This process combines elements of the Data Quality Objective (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. This has already been completed for the mud pit so it will not be repeated here. The DQOs for the mud pit are presented in the Corrective Action Investigation Plan for Project Shoal Area, CAU No. 416 (DOE/NV, 1996). This observational approach provides a framework for managing uncertainty and planning decision making.

  9. Red Oak Borer

    Treesearch

    D. E. Donley; R.E. Acciavatti

    1980-01-01

    The red oak borer, Enaphalodes rufulus (Haldeman)3, is an important member of the oak borer complex that permanently damages the wood of living oak trees and causes a decrease in lumber grade. The loss in grade can amount to 40 percent of the current tree value, which, at today's prices, is about $80 per thousand board feet for factory grade lumber in terms of...

  10. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown.

  11. Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee

    SciTech Connect

    2005-03-02

    This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soil at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for

  12. Improving Attainment through Action Research: An Introduction to Hillingdon's Raising Achievement Project.

    ERIC Educational Resources Information Center

    Irshad, Khalid; Imrie, Jean

    1997-01-01

    Describes the Raising Achievement Project designed to address the need for more information on the performance of ethnic minorities for whom English is an additional language, and the need for support for children who have passed the initial stages of learning English. It also describes the action research model used to answer questions about…

  13. Clients, Colleagues or Experts? Defining Identities in an Action Research Project

    ERIC Educational Resources Information Center

    Coco, Angela; Varnier, Catherine; Deftereos, Chris

    2007-01-01

    This article examines how discourses shaped and were shaped by participants' identities in a participatory action research (PAR) project in a tertiary education environment. The primary researcher and the director of the university's desktop publishing team explored the idea of working together to help the newly formed team to develop strategies…

  14. Some Recurrent Disagreements about Social Change Which Affect Action Research Projects.

    ERIC Educational Resources Information Center

    Hofstetter, Heather N.; Hofstetter, Merlin I.

    This paper describes the beliefs and values of a pluralistic approach to social change and of four competing approaches: social Darwinism, functionalism, militancy, and conflict theory. Stressing the alienation and dogmatism of the competing approaches, the authors relate each approach to its operation in community action projects. Social…

  15. 78 FR 45997 - Notice of Final Federal Agency Actions on Transportation Project in Washington State

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ...)(1). The actions relate to the State Route 167 Puyallup to SR 509, Puyallup River Bridge Replacement... is the Record of Decision (ROD), which selects a new bridge and roadway alignment for southbound... Route 167 Puyallup to SR 509, Puyallup River Bridge Replacement Project in the State of Washington. The...

  16. An Action Research Project Exploring the Psychology Curriculum and Transitions to Employment

    ERIC Educational Resources Information Center

    McMurray, Isabella; Roberts, Pat; Robertson, Ian; Teoh, Kevin

    2011-01-01

    Within the UK, traditional subject-specific areas are increasingly being complemented by the provision of opportunities to foster students' personal development planning as an aide to support their future employment and lifelong learning. This paper describes an action research project which examined employability skills within a psychology…

  17. The Evaluation of an Early Childhood Teacher Preparation Program: An Action Research Project

    ERIC Educational Resources Information Center

    Ragno, Kerry Sullivan

    2013-01-01

    The purpose of this dissertation was to evaluate the effectiveness of an Early Childhood Development Associate of Applied Science (AAS) degree program at one community college as part of an ongoing action research project. Prior to this dissertation study, external and internal barriers prevented the associate degree program stakeholders from…

  18. Participatory Action Research: Reflections on Critical Incidents in a PAR Project.

    ERIC Educational Resources Information Center

    Santelli, Betsy; Singer, George H. S.; DiVenere, Nancy; Ginsberg, Connie; Powers, Laurie E.

    1998-01-01

    This article describes a participatory action research (PAR) project designed to evaluate Parent to Parent programs in five states. The process of developing a shared understanding of the program and of the purpose for evaluating them, along with an on-going willingness of parents and researchers to compromise, led to creative solutions to…

  19. "Who Did What?": A Participatory Action Research Project to Increase Group Capacity for Advocacy

    ERIC Educational Resources Information Center

    Garcia-Iriarte, E.; Kramer, J. C.; Kramer, J. M.; Hammel, J.

    2009-01-01

    Background: This participatory action research (PAR) project involved a collaboration with a self-advocacy group of people with intellectual disabilities that sought to build group capacity for advocacy. Materials and Methods: This study used a focus group, sustained participatory engagement and a reflexive process to gather qualitative and…

  20. Preschool Work against Bullying and Degrading Treatment: Experiences from an Action Learning Project

    ERIC Educational Resources Information Center

    Söderström, Åsa; Löfdahl Hultman, Annica

    2017-01-01

    This article deals with experiences from an action learning project against bullying and degrading treatment among nine Swedish preschools. Even though definitions of bullying and degrading treatment tend to lead to thoughts of school-age children rather than preschoolers, previous research shows that bullying occurs in preschool as well. Our data…

  1. Conscious Engagement in Undergraduate Male Nursing Students: Facilitating Voice through an Action Research Project

    ERIC Educational Resources Information Center

    Maykut, Colleen A.; Lee, Andrew; Argueta, Nelson Garcia; Grant, Sean; Miller, Cole

    2016-01-01

    Although women have made significant progress into traditionally male-dominated professions, such as medicine and engineering, the same cannot be said of men in the nursing profession. Utilizing a critical social theory perspective, an action research project was designed to encourage participants, current male nursing students and alumni of…

  2. Rapid Growth from Energy Projects: Ideas for State and Local Action. A Program Guide.

    ERIC Educational Resources Information Center

    Federal Energy Administration, Washington, DC.

    This publication is intended to aid local public officials and interested citizens in planning how to best manage rapid population growth resulting from construction and/or development of new energy-related facilities. In particular, it discusses what the impact of an energy project on a community is likely to be, shares ideas for action based on…

  3. Chicana Feminist Strategies in a Participatory Action Research Project with Transnational Latina Youth

    ERIC Educational Resources Information Center

    Sanchez, Patricia

    2009-01-01

    This article discusses a participatory action research (PAR) project carried out with three transnational Latina youth in northern California and how the university researcher incorporated Chicana feminist strategies in the study. PAR and Chicana feminism place at the heart of research the knowledge that ordinary people produce, referring to this…

  4. Conscious Engagement in Undergraduate Male Nursing Students: Facilitating Voice through an Action Research Project

    ERIC Educational Resources Information Center

    Maykut, Colleen A.; Lee, Andrew; Argueta, Nelson Garcia; Grant, Sean; Miller, Cole

    2016-01-01

    Although women have made significant progress into traditionally male-dominated professions, such as medicine and engineering, the same cannot be said of men in the nursing profession. Utilizing a critical social theory perspective, an action research project was designed to encourage participants, current male nursing students and alumni of…

  5. Improving Teachers' Practices through Supervision and Observations by School Principals: An Action Research Project

    ERIC Educational Resources Information Center

    Taylor, Latasha M.

    2013-01-01

    This study focused on the impact of a new observation tool for principals to utilize and the effects it has on improving teachers' instruction and influencing best practices. The action research project explored the impact and influence that a well-developed observation tool could possess to help address areas of need; essentially, focusing on how…

  6. Mirror Images: Teaching Writing in Black and White. Webster Groves Action Research Project.

    ERIC Educational Resources Information Center

    Krater, Joan; And Others

    Presenting classroom experiences and a process to help writing teachers see their own hard-to-reach students with new eyes, this book tells the story of a 6-year action research project committed to building classroom environments where cultural differences are affirmed and high achievement is fostered among all students. The book notes that the…

  7. Culminating Experience Action Research Projects, Volume 16, Part 1, Spring 2010

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  8. Culminating Experience Action Research Projects, Volume 15, Part 2, Fall 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.

    2009-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience or with school employment. This course, Education…

  9. Culminating Experience Action Research Projects, Volume 15, Part 1, Fall 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  10. I Play, Therefore I Am: An Undergraduate Philosophical Action Research Project.

    ERIC Educational Resources Information Center

    Stoll, Sharon Kay; Beller, Jennifer M.; Mathews, Allison; Matthews, Julie; Trainer, Maria; Freitas, Brandon; McLaughlin, Casey; Milke, Mary

    2000-01-01

    Asked undergraduate students' opinions of Descartes' belief that the mind and body are separate, then had them conduct action research projects examining whether the mind-body dilemma might be overcome if teachers valued the essential nature of play and applied it to sport and physical education. Results supported the hypothesis that physical…

  11. Improving Teachers' Practices through Supervision and Observations by School Principals: An Action Research Project

    ERIC Educational Resources Information Center

    Taylor, Latasha M.

    2013-01-01

    This study focused on the impact of a new observation tool for principals to utilize and the effects it has on improving teachers' instruction and influencing best practices. The action research project explored the impact and influence that a well-developed observation tool could possess to help address areas of need; essentially, focusing on how…

  12. Chicana Feminist Strategies in a Participatory Action Research Project with Transnational Latina Youth

    ERIC Educational Resources Information Center

    Sanchez, Patricia

    2009-01-01

    This article discusses a participatory action research (PAR) project carried out with three transnational Latina youth in northern California and how the university researcher incorporated Chicana feminist strategies in the study. PAR and Chicana feminism place at the heart of research the knowledge that ordinary people produce, referring to this…

  13. The Evaluation of an Early Childhood Teacher Preparation Program: An Action Research Project

    ERIC Educational Resources Information Center

    Ragno, Kerry Sullivan

    2013-01-01

    The purpose of this dissertation was to evaluate the effectiveness of an Early Childhood Development Associate of Applied Science (AAS) degree program at one community college as part of an ongoing action research project. Prior to this dissertation study, external and internal barriers prevented the associate degree program stakeholders from…

  14. Culminating Experience Action Research Projects, Volume 8, Part 1, Spring 2006

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Fritch, Sarah C., Ed.

    2007-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  15. Culminating Experience Action Research Projects, Volume 18, Part 1, Spring 2016

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.

    2017-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience or with school employment. This course, Education…

  16. A Survey of Food Projects in the English NHS Regions and Health Action Zones in 2001

    ERIC Educational Resources Information Center

    Caraher, Martin; Cowburn, Gill

    2004-01-01

    Background and Objective: This article sets out the findings from an analysis of food projects, with a particular emphasis on fruit and vegetables, from the 26 Health Action Zones (HAZs) in England and those taking place within the former NHS regional areas in 2001. The objective was to gather information on the existing practice to inform future…

  17. The Action--Reflection--Modelling (ARM) Pedagogical Approach for Teacher Education: A Malaysia-UK Project

    ERIC Educational Resources Information Center

    Jarvis, Joy; Dickerson, Claire; Thomas, Kit; Graham, Sally

    2014-01-01

    This article presents the Action--Reflection--Modelling (ARM) pedagogical approach for teacher education developed during a Malaysia-UK collaborative project to construct a Bachelor of Education (Honours) degree programme in Primary Mathematics, with English and Health and Physical Education as minor subjects. The degree programme was written…

  18. The QUIPPED Project: Exploring Relevance and Rigor of Action Research Using Established Principles and Criteria

    ERIC Educational Resources Information Center

    Chapman, Christine; Paterson, Margo; Medves, Jennifer M.

    2011-01-01

    This paper is the last in a series of three manuscripts published in the TQR journal over the past few years. This work is part of a larger program of research that has been carried out by a team of researchers detailing various aspects of a three year action research project carried out from 2005 and 2008. This particular paper addresses issues…

  19. "Who Did What?": A Participatory Action Research Project to Increase Group Capacity for Advocacy

    ERIC Educational Resources Information Center

    Garcia-Iriarte, E.; Kramer, J. C.; Kramer, J. M.; Hammel, J.

    2009-01-01

    Background: This participatory action research (PAR) project involved a collaboration with a self-advocacy group of people with intellectual disabilities that sought to build group capacity for advocacy. Materials and Methods: This study used a focus group, sustained participatory engagement and a reflexive process to gather qualitative and…

  20. Participatory Action Research: Reflections on Critical Incidents in a PAR Project.

    ERIC Educational Resources Information Center

    Santelli, Betsy; Singer, George H. S.; DiVenere, Nancy; Ginsberg, Connie; Powers, Laurie E.

    1998-01-01

    This article describes a participatory action research (PAR) project designed to evaluate Parent to Parent programs in five states. The process of developing a shared understanding of the program and of the purpose for evaluating them, along with an on-going willingness of parents and researchers to compromise, led to creative solutions to…

  1. A Survey of Food Projects in the English NHS Regions and Health Action Zones in 2001

    ERIC Educational Resources Information Center

    Caraher, Martin; Cowburn, Gill

    2004-01-01

    Background and Objective: This article sets out the findings from an analysis of food projects, with a particular emphasis on fruit and vegetables, from the 26 Health Action Zones (HAZs) in England and those taking place within the former NHS regional areas in 2001. The objective was to gather information on the existing practice to inform future…

  2. From Results to Action - Implementing an Indoor Air Quality Pilot Project

    NASA Astrophysics Data System (ADS)

    Collier, A. M.; Ware, G. E.; Iwasaki, P. G.; Billingsley, L. R.; Main, D.; Hannigan, M.; Pfotenhauer, D.

    2016-12-01

    One of the key differences between community-based participatory research (CBPR) and more conventional scientific research is the expectation that a project does not end with finalized results, but rather with taking action based on those results. Using an indoor air quality pilot project as an example, we will discuss how the consideration of potential actions and applications for the project findings should be integrated into planning throughout the life of a project. We will also share general reflections on effective CBPR from the perspective of both science and community partners on the project. In 2015, Taking Neighborhood Health to Heart (TNH2H), a community-based organization in Northeast Denver, researchers from the University of Colorado, Boulder, and AGU's Thriving Earth Exchange partnered to conduct a pilot project investigating indoor air quality in a Denver community. This partnership formed in response to community concerns about potential environmental contamination from dry cleaning operations, specifically through spills of the compound perchloroethylene. The exploration of the presence of radon, another indoor air quality concern common across the state of Colorado, was also added to the project. Using an iterative process, the team designed a sampling plan, selected a target location, and recruited homes and residents to participate in the pilot project. Radon and perchloroethylene data were then collected in 15 homes. Following data collection, results were first shared with project participants, after which de-identified data were shared with the members of TNH2H. Together TNH2H and researchers then developed strategies for public dissemination of the project findings. While we did not find levels of percholorethylene above the `action level' in any of the participating homes; however, we did find more frequent occurrences of radon levels above the `action level' than we had anticipated. For example, 80% of the homes in our study had radon

  3. [Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1992-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

  4. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    SciTech Connect

    Not Available

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date.

  5. Silvical characteristics of the five upland oaks

    Treesearch

    Earl L. Core

    1971-01-01

    The five most important upland oaks of eastern North America are white oak (Quercus alba), chestnut oak (Q. prinus), northern red oak (Q. rubra), black oak (Q. velutina), and scarlet oak (Q. coccinea). Of these, white oak and northern red oak are most characteristic of...

  6. Preliminary analysis of environmental regulations related to remedial action activities at the Oak Ridge National Laboratory: Environmental Sciences Division Publication No. 2695

    SciTech Connect

    Voorhees, L.D.; Saylor, R.E.

    1986-11-01

    Past research and development activities at Oak Ridge National Laboratory (ORNL) have resulted in the presence of several areas where low-level radioactive and/or hazardous waste have been disposed of or that have been contaminated through accidental spills or planned releases of radionuclides. Although these areas have been monitored and controlled to ensure that on-site and off-site releases of contaminants are within applicable Department of Energy (DOE) guidelines, ORNL established the Environmental Restoration and Facilities Upgrade (ERFU) Program to address formally the immediate and long-range needs of meeting all applicable federal and state regulations regarding waste disposal. The environmental laws, regulations, and DOE Orders governing the cleanup activities are numerous and complex. Hence, a synthesis of the principal regulations related to the ERFU Program is presented to facilitate efficient planning for characterization and cleanup of contaminated sites. Because of regulatory decisions made after this report was finalized, several statements presented herein may no longer apply to the ERFU Program. Nevertheless, the report is issued as originally written so that ORNL's early planning efforts to comply with environmental laws and legislation are formally documented. Several general principles to consider when developing a plan for environmental compliance - which would be of use to others who must comply with legislation related to the cleanup of sites contaminated with radionuclides and hazardous chemicals - are also discussed.

  7. UMTRA Surface Project management action process document. Final report: Revision 1

    SciTech Connect

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

  8. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock... a proposed highway project, Sunrise Project, I-205 to Rock Creek Junction, Clackamas County, Oregon..., NE., Suite 100, Salem, Oregon 97301, Telephone: (503) 587-4716. The Sunrise Project, I-205 to Rock...

  9. Estimating Pre-treatment Variation in the Oak Leaf-chewing Insect Fauna of the Missouri Ozark Forest Ecosystem Project (MOFEP)

    Treesearch

    Robert J. Marquis; Josiane. Le Corff

    1997-01-01

    We describe spatial and temporal variation in the insect herbivore communities associated with the MOFEP, prior to application of contrasting cutting regimes. No pre-treatment differences were found in total insect density on either black (Quercus velutina) or white oak (Q. alba) during 1993-1995. There was great seasonal...

  10. The Oak Park Plan: The Fourth "R" (Rescheduling).

    ERIC Educational Resources Information Center

    Mueller, Ernest H.

    The Oak Park Plan, implemented in the Oak Park (Illinois) School District, was a 2-year (1983-85) project designed to correct four perceived problems: (1) low achievement levels in math for 40 percent of the students; (2) ineffective remedial instruction; (3) declining enrollment requiring an adjustment in personnel resources and service levels;…

  11. Screening of contaminants in Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Blaylock, B.G.; Frank, M.L.; Hoffman, F.O.; Hook, L.A.; Suter, G.W.; Watts, J.A.

    1992-07-01

    Waste Area Grouping 2 (WAG 2) of the Oak Ridge National Laboratory (ORNL) is located in the White Oak Creek Watershed and is composed of White Oak Creek Embayment, White Oak Lake and associated floodplain, and portions of White Oak Creek (WOC) and Melton Branch downstream of ORNL facilities. Contaminants leaving other ORNL WAGs in the WOC watershed pass through WAG 2 before entering the Clinch River. Health and ecological risk screening analyses were conducted on contaminants in WAG 2 to determine which contaminants were of concern and would require immediate consideration for remedial action and which contaminants could be assigned a low priority or further study. For screening purposes, WAG 2 was divided into four geographic reaches: Reach 1, a portion of WOC; Reach 2, Melton Branch; Reach 3, White Oak Lake and the floodplain area to the weirs on WOC and Melton Branch; and Reach 4, the White Oak Creek Embayment, for which an independent screening analysis has been completed. Screening analyses were conducted using data bases compiled from existing data on carcinogenic and noncarcinogenic contaminants, which included organics, inorganics, and radionuclides. Contaminants for which at least one ample had a concentration above the level of detection were placed in a detectable contaminants data base. Those contaminants for which all samples were below the level of detection were placed in a nondetectable contaminants data base.

  12. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    SciTech Connect

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department

  13. Variations in juvenile oak

    Treesearch

    Peter W. Garrett; Harry C. Kettlewood

    1975-01-01

    Data from research on 13-year-old trees in an oak planting in southeastern Pennsylvania indicate that survival and growth are not correlated with source latitude within all species tested. A complete listing of species and seed origins, along with performance of progenies, is presented for persons interested in oak improvement.

  14. An oak wilt primer

    Treesearch

    Jennifer Juzwik

    2000-01-01

    Oak wilt, caused by the fungus Ceratocystis fagacearum {Bretz} Hunt, is an important disease of oaks (Quercus spp.) in the eastern United States. the disease occurs in 22 states and is considered the most important forest disease problem in Illinois, Iowa, Minnesota, Texas and Wisconsin. The pathogen causes mortality of thousands...

  15. Goldspotted oak borer

    Treesearch

    M.L. Flint; M. I. Jones; T. W. Coleman; S.J. Seybold

    2013-01-01

    The goldspotted oak borer (GSOB), Agrilus auroguttatus (Coleoptera: Buprestidae), is a flatheaded borer introduced to San Diego County, California, in the late 1990s or early 2000s and also detected at one site in Riverside County in 2012. It was likely brought into the state on oak firewood collected and transported from the insect's native...

  16. California oaks: a bibliography

    Treesearch

    James R. Griffin; Philip M. McDonald; Pamela C. Muick

    1987-01-01

    Among natural resource professionals, California oaks continue to attract considerable attention. This report provides a comprehensive bibliography of the extensive but scattered oak literature. The 768 references are organized into two systems: (a) a topical outline, in which references are displayed under key word headings and subheadings, and author-date entries...

  17. Reconstituted products from oak

    Treesearch

    W. C. Lewis; B. G. Heebink

    1971-01-01

    "Reconstituted" describes a family of panel products made from fractionated oak, bonded with either a synthetic resin or a natural lignin bond. Several current commercial fiber panel products from oak are described, and the status of research on experimental products and processes is presented. Recent technological developments are removing the stigma...

  18. Response of advance reproduction of oaks and associated species to repeated prescribed fires in upland oak-hickory forests, Missouri

    Treesearch

    Zhaofei Fan; Zhongqiu Ma; Daniel C. Dey; Scott D. Roberts

    2012-01-01

    The Chilton Creek prescribed burn project was initiated in 1996 by The Nature Conservancy (TNC) to restore native oak woodlands and test the effect of frequent, low intensity surface fires conducted in the dormant season (March-April) on upland oak-hickory forests in the Ozarks of Missouri. Burning treatments on five sites totaling 1000 ha were initiated in 1998. The...

  19. Project Northland high school interventions: community action to reduce adolescent alcohol use.

    PubMed

    Perry, C L; Williams, C L; Komro, K A; Veblen-Mortenson, S; Forster, J L; Bernstein-Lachter, R; Pratt, L K; Dudovitz, B; Munson, K A; Farbakhsh, K; Finnegan, J; McGovern, P

    2000-02-01

    Project Northland is a randomized community trial initially implemented in 24 school districts and communities in northeastern Minnesota, with goals of delaying onset and reducing adolescent alcohol use using community-wide, multiyear, multiple interventions. The study targets the Class of 1998 from the 6th to 12th grades (1991-1998). The early adolescent phase of Project Northland has been completed, and reductions in the prevalence of alcohol use at the end of 8th grade were achieved. Phase II of Project Northland, targeting 11th- and 12th-grade students, uses five major strategies: (1) direct action community organizing methods to encourage citizens to reduce underage access to alcohol, (2) youth development involving high school students in youth action teams, (3) print media to support community organizing and youth action initiatives and communicate healthy norms about underage drinking (e.g., providing alcohol to minors is unacceptable), (4) parent education and involvement, and (5) a classroom-based curriculum for 11th-grade students. This article describes the background, design, implementation, and process measures of the intervention strategies for Phase II of Project Northland.

  20. 78 FR 42151 - Notice of Final Federal Agency Actions on the Goethals Bridge Replacement Project in New York and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Goethals Bridge Replacement... meaning of 23 U.S.C. 139(l)(1). The actions relate to the Goethals Bridge Replacement Project located in... New York and New Jersey: Goethals Bridge Replacement Project. The Goethals Bridge provides a direct...

  1. Toward Solutions: The Work of the Physics Action-Research Group. Learning in Science Project. Working Paper No. 32.

    ERIC Educational Resources Information Center

    Osborne, Roger; Schollum, Brendan

    In the action-research phase of the Learning in Science Project, four groups of people worked on problems identified in the project's second (in-depth) phase. The Physics action-research group considered problems related to the teaching and learning of ideas associated with force and motion, suggesting that children's ideas of these concepts might…

  2. Toward Solutions: The Work of the Chemistry Action-Research Group. Learning in Science Project. Working Paper No. 35.

    ERIC Educational Resources Information Center

    Osborne, Roger; And Others

    In the action-research phase of the Learning in Science Project, four groups of people worked on problems identified in the project's second (in-depth) phase. The Chemistry Action-Research Group considered problems related to the teaching and learning of ideas associated with particles and physical/chemical changes. Based on findings during the…

  3. Using telematics with older people: the ACTION project. Assisting Carers using Telematics Interventions to meet Older persons' Needs.

    PubMed

    Magnusson, L; Berthold, H; Chambers, M; Brito, L; Emery, D; Daly, T

    In this article, the authors provide an overview of the pan-European Assisting Carers using Telematics Interventions to meet Older persons' Needs (ACTION) project. They focus on the developmental aspects of the ACTION project and discuss ongoing work and future development plans.

  4. Toward Solutions: The Work of the Physics Action-Research Group. Learning in Science Project. Working Paper No. 32.

    ERIC Educational Resources Information Center

    Osborne, Roger; Schollum, Brendan

    In the action-research phase of the Learning in Science Project, four groups of people worked on problems identified in the project's second (in-depth) phase. The Physics action-research group considered problems related to the teaching and learning of ideas associated with force and motion, suggesting that children's ideas of these concepts might…

  5. Removal site evaluation report for the Isotope Facilities at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1996-07-01

    This removal site evaluation (RmSE) report of the Isotope Facilities at Oak Ridge National Laboratory (ORNL) was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the Isotopes Facility pose a substantial risk to human health or the environment and if remedial site evaluations (RSEs) or removal actions are required. The scope of the project included: (1) a review of historical evidence regarding operations and use of the facility; (2) interviews with facility personnel concerning current and past operating practices; (3) a site inspection; and (4) identification of hazard areas requiring maintenance, removal, or remedial actions. The results of RmSE indicate that no substantial risks exist from contaminants present in the Isotope Facilities because adequate controls and practices exist to protect human health and the environment. The recommended correction from the RmSE are being conducted as maintenance actions; accordingly, this RmSE is considered complete and terminated.

  6. An integrated methodology for assessment and selection of the project risk response actions.

    PubMed

    Seyedhoseini, Seyed Mohammad; Noori, Siamak; Hatefi, Mohammad Ali

    2009-05-01

    In a systematic process of project risk management, after risk assessment is implemented, the risk analysts encounter the phase of assessment and selection of the project risk response actions (RA). As indicated by many researchers, there are less systematic and well-developed solutions in the area of risk response assessment and selection. The present article introduces a methodology including a modeling approach with the objective of selecting a set of RA that minimizes the undesirable deviation from achieving the project scope. The developed objective function comprises the three key success criteria of a project, namely, time, quality, and cost. Our model integrates overall project management into the project risk response planning (P2RP). Furthermore, the proposed model stresses on an equivalent importance for both "risk" and "response." We believe that applying the proposed model helps the project risk analyst in most effective and efficient manner dealing with his or her complicated RA selection problems. The application of the proposed model was implemented in projects in the construction industry in which it showed tremendous time, cost, and quality improvements.

  7. Action Memorandum for General Decommissioning Activities under the Idaho Cleanup Project

    SciTech Connect

    S. L. Reno

    2006-10-26

    This Action Memorandum documents the selected alternative to perform general decommissioning activities at the Idaho National Laboratory (INL) under the Idaho Cleanup Project (ICP). Preparation of this Action Memorandum has been performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the "Superfund Amendments and Reauthorization Act of 1986", and in accordance with the "National Oil and Hazardous Substances Pollution Contingency Plan". An engineering evaluation/cost analysis (EE/CA) was prepared and released for public comment and evaluated alternatives to accomplish the decommissioning of excess buildings and structures whose missions havve been completed.

  8. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    SciTech Connect

    1997-12-31

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project.

  9. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  10. WSSRAP chemical plant geotechnical investigations for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1990-12-01

    This document has been prepared for the United states Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which consists of MK-Ferguson Company (MKF) and Morrison Knudsen Corporation Environmental Services Group (MKES) with Jacobs Engineering Group (JEG) as MKF's predesignated subcontractor. This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. The WSCP/RP is the proposed disposal cell (DC) site. 39 refs., 24 figs., 12 tabs.

  11. Yes, I Can: Action Projects To Resolve Equity Issues in Educational Computing. A Project of ECCO, the Educational Computer Consortium of Ohio.

    ERIC Educational Resources Information Center

    Fredman, Alice, Ed.

    This book presents reports on selected "local action" projects that were developed as part of the Equity in Technology Project, which was inaugurated in 1985 by the Educational Computer Consortium of Ohio (ECCO). The book is organized into three sections, one for each of the populations targeted by the project. An introduction by Alice Fredman…

  12. The paleohistory of California oaks

    Treesearch

    Scott Mensing

    2015-01-01

    Oak woodlands are a fixture of California geography, yet as recently as 10,000 years ago oaks were only a minor element in the landscape. The first fossil evidence for California's oaks is in the early Miocene (~20 million years ago) when oaks were present across the west, intermixed with deciduous trees typical of eastern North America. As climate became drier,...

  13. Fitting Fire into Oak Management

    Treesearch

    Patrick Brose

    2004-01-01

    In the past decade, the use of prescribed fire in the mixed-oak forests of the eastern United States has markedly increased to help overcome the chronic lack of abundant, vigorous oak regeneration (Yaussy 2000). However, pre- scribed burns implemented under inappropriate circum- stances can result in failure to establish oak regeneration and/or loss of existing oak...

  14. Civic Action Projects Report, 1 January 1965-31 December 1965. Volume 1

    DTIC Science & Technology

    1966-06-22

    construcELon and ship repair facilities in Argentina, the Navy utilizes its facilities, on a non-competitive basis with civilian industry , tr repair...been quite industrious during the past year. The following projects were supported by the committee, with excellent results: a. Potable water...the Escuela Militär de Ingenieria , to provide a basic reference lihrary on civic action. 9. PROBLEM AREAS. Seme excellent press releases have been

  15. 2009 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2010-03-01

    This report presents the 2009 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the PSA during fiscal year 2009.

  16. 2008 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2009-03-01

    This report presents the 2008 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof of concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the site during 2008. This is the second groundwater monitoring report prepared by LM for the PSA

  17. 2010 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2011-02-01

    This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended March 2010) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes the results from the groundwater monitoring program during fiscal year 2010.

  18. Aroma potential of oak battens prepared from decommissioned oak barrels.

    PubMed

    Li, Sijing; Crump, Anna M; Grbin, Paul R; Cozzolino, Daniel; Warren, Peter; Hayasaka, Yoji; Wilkinson, Kerry L

    2015-04-08

    During barrel maturation, volatile compounds are extracted from oak wood and impart aroma and flavor to wine, enhancing its character and complexity. However, barrels contain a finite pool of extractable material, which diminishes with time. As a consequence, most barrels are decommissioned after 5 or 6 years. This study investigated whether or not decommissioned barrels can be "reclaimed" and utilized as a previously untapped source of quality oak for wine maturation. Oak battens were prepared from staves of decommissioned French and American oak barrels, and their composition analyzed before and after toasting. The oak lactone glycoconjugate content of untoasted reclaimed oak was determined by liquid chromatography-tandem mass spectrometry, while the concentrations of cis- and trans-oak lactone, guaiacol, 4-methlyguaiacol, vanillin, eugenol, furfural, and 5-methylfurfural present in toasted reclaimed oak were determined by gas chromatography-mass spectrometry. Aroma potential was then evaluated by comparing the composition of reclaimed oak with that of new oak. Comparable levels of oak lactone glycoconjugates and oak volatiles were observed, demonstrating the aroma potential of reclaimed oak and therefore its suitability as a raw material for alternative oak products, i.e., chips or battens, for the maturation of wine. The temperature profiles achieved during toasting were also measured to evaluate the viability of any yeast or bacteria present in reclaimed oak.

  19. Action-projection in Japanese conversation: topic particles wa, mo, and tte for triggering categorization activities

    PubMed Central

    Tanaka, Hiroko

    2015-01-01

    Conversation analytic work has revealed how anticipatory completions and preemptive actions can offer invaluable glimpses into the cognitive, contextual, grammatical, and temporal bases of projectability in turn-taking, by virtue of their potential not only as a display of participants' online prediction of roughly what it might take to complete a turn-in-progress but also to plan the next move. While the predicate-final word order and the incremental transformability of turns in Japanese generally lead to delayed projectability of turn-endings, this may be partially offset by the capacity of certain postpositional particles to trigger and propel prospective action trajectories. This article engages in a case study of the topic particle wa (and related particles mo and tte), by demonstrating how its grammatical affordances, the categorization activities, and cognitive processing it can set in motion, coupled with the immediate contextual, and temporal-productional features may coalesce to a point of critical mass, thereby enhancing the projectability of the not-yet-produced trajectory of the current turn. The discussion attempts to contribute to recent debates on ways language-specific lexicogrammatical resources are deeply interlinked with the types of opportunities that are provided for social action. PMID:26379565

  20. An integrated ball projection technology for the study of dynamic interceptive actions.

    PubMed

    Stone, J A; Panchuk, D; Davids, K; North, J S; Fairweather, I; Maynard, I W

    2014-12-01

    Dynamic interceptive actions, such as catching or hitting a ball, are important task vehicles for investigating the complex relationship between cognition, perception, and action in performance environments. Representative experimental designs have become more important recently, highlighting the need for research methods to ensure that the coupling of information and movement is faithfully maintained. However, retaining representative design while ensuring systematic control of experimental variables is challenging, due to the traditional tendency to employ methods that typically involve use of reductionist motor responses such as buttonpressing or micromovements. Here, we outline the methodology behind a custom-built, integrated ball projection technology that allows images of advanced visual information to be synchronized with ball projection. This integrated technology supports the controlled presentation of visual information to participants while they perform dynamic interceptive actions. We discuss theoretical ideas behind the integration of hardware and software, along with practical issues resolved in technological design, and emphasize how the system can be integrated with emerging developments such as mixed reality environments. We conclude by considering future developments and applications of the integrated projection technology for research in human movement behaviors.

  1. Disease management projects and the Chronic Care Model in action: baseline qualitative research.

    PubMed

    Walters, Bethany Hipple; Adams, Samantha A; Nieboer, Anna P; Bal, Roland

    2012-05-11

    Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in The Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in The Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project's chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders' action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved. At the sites, project leaders served

  2. 25 MV tandem accelerator at Oak Ridge

    SciTech Connect

    Jones, C.M.

    1980-01-01

    A new heavy-ion accelerator facility is under construction at the Oak Ridge National Laboratory. A brief description of the scope and status of this project is presented with emphasis on the first operational experience with the 25 MV tandem accelerator.

  3. Cooperative and Context-Based Learning on Eletrochemical Cells in Lower Secondary Chemistry: A Project of Participatory Action Research

    ERIC Educational Resources Information Center

    Markic, Silvija; Eilks, Ingo

    2006-01-01

    This paper discusses a project of Participatory Action Research (PAR) on lower secondary chemistry education. In this ongoing project, practicing teachers and university researchers in chemical education jointly carry out projects for developing and evaluating new lesson plans. The focus of the PAR group is to develop teaching/learning activities…

  4. Key programmatic steps and activities for implementing the Uranium Mill Tailings Remedial Action Project. [UMTRA Project

    SciTech Connect

    Not Available

    1985-07-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) was enacted based upon findings by Congress that uranium mill tailings located at active and inactive hazard to the public, and that protection of the public health, safety and welfare, and the regulations of interstate commerce, require that every reasonable effort be made to provide for the stabilization, disposal, and control in a safe and environmentally sound manner of such tailings in order to prevent or minimize radon diffusion into the environment and to prevent or minimize other environmental hazards from such tailings.'' A general understanding of the steps leading to elimination of the hazards associated with designated uranium mill tailings sites, and the parties involved in that effort, are presented in this document. A representative schedule is also presented in this document to show both program sequence and activity interdependence. Those activities that have the most potential to influence program duration, because of the significant amount of additional time that may be required, include identification and selection of a suitable site, field data collection delays due to weather, actual acquisition of the designated or alternate disposal site, construction delays due to weather, and site licensing. This document provides an understanding of the steps, the sequence, the parties involved, and a representative duration of activities leading to remedial action and cleanup at the designated inactive uranium mill tailings sites. 10 refs., 5 figs., 1 tab.

  5. Disease management projects and the Chronic Care Model in action: baseline qualitative research

    PubMed Central

    2012-01-01

    Background Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in the Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in the Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Methods Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project’s chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders’ action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. Results This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved

  6. Storing Red Oak Acorns

    Treesearch

    F. T. Bonner

    1973-01-01

    Cherrybark, Shumard, and water oak acorns can be stored for 3 years or longer if kept at a moisture content of at least 30 percent of fresh weight and at a temperature of 37F. Polyethylene bags are good containers.

  7. Poison ivy - oak - sumac

    MedlinePlus

    ... this page: //medlineplus.gov/ency/article/002886.htm Poison ivy - oak - sumac To use the sharing features ... the plant, if known Amount swallowed (if swallowed) Poison Control Your local poison center can be reached ...

  8. Routine interventions in childbirth before and after initiation of an Action Research project.

    PubMed

    Nyman, Viola; Roshani, Leyla; Berg, Marie; Bondas, Terese; Downe, Soo; Dencker, Anna

    2017-03-01

    Unnecessary routine interventions in uncomplicated labour and birth, like cardiotocography (CTG), amniotomy, use of scalp electrode and oxytocin treatment, are associated with further interventions that could harm the woman and the infant. A four year Action Research (AR) project was done on a labour ward to enhance the capacity of local midwives in the promotion of physiological labour and birth. To describe the use of interventions during labour and birth in healthy women at term with spontaneous onset of labour, before and after initiation of an Action Research project. A retrospective before and after comparative study of clinical records from 2009 (before) and 2012 (after), based on a random selection of records from primiparous and multiparous women. Outcome measures were duration of admission CTG, frequency of admission CTG over 30min, frequency of amniotomy, use of scalp electrode, and frequency of oxytocin augmentation in spontaneous labour. 903 records were included. The duration of admission CTG (p=0.001), frequency of admission CTG duration over 30min (p=<0.001), the use of scalp electrodes (p=<0.001), and use of oxytocin augmentation of spontaneous labour (p=0.014) were reduced significantly after initiation of the AR project. There were no significant differences in frequency of amniotomy, duration of total CTG, postpartum bleeding, sphincter tears, Apgar score <5 at 5min, and mode of birth. Following an AR project, several interventions were reduced during labour and birth. Controlled studies in other settings are needed to assess the impact of collaborative action on decreasing unnecessary interventions. Copyright © 2016 Elsevier B.V. All rights reserved.

  9. Industrial Sites Project Establishment of Final Action Levels, Rev. No.: 0

    SciTech Connect

    Boehlecke, Robert F.

    2006-02-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  10. Working and Learning Among California Oaks

    NASA Astrophysics Data System (ADS)

    Tietje, B.; Gingg, B.; Zingo, J.; Huntsinger, L.

    2009-04-01

    With tremendous support from collaborators and enthusiastic volunteers, "Learning Among the Oaks" at the historic Santa Margarita Ranch has become a favorite outdoor learning experience for hundreds of Santa Margarita School students, along with their teachers and families. Oaks are at the center of this unique and cost effective public education program. From getting to know local oaks to exploring conservation issues within the context of a historic working cattle ranch, students take pride in expanding their awareness and knowledge of the local oak woodland community. Santa Margarita School families representing the varied demographics of the community come together on the trail. For many, the program provides a first opportunity to get to know those who make a living on the land and to understand that this land around their school is more than a pretty view. "Learning Among the Oaks" also addresses the need for quality, hands-on science activities and opportunities to connect children with the outdoor world. Using a thematic approach and correlating lessons with State Science Standards, we've engaged students in a full-spectrum of exciting outdoor learning adventures. As students progress through the grades, they find new challenges within the oak trail environment. We've succeeded in establishing an internship program that brings highly qualified, enthusiastic university students out to practice their science teaching skills while working with elementary school students. In the future, these university student interns may assist with the development of interpretive displays, after-school nature activities and monitoring projects. We've benefited from proximity to Cal Poly State University and its "learn-by-doing" philosophy. We've also succeeded in building a dedicated network of volunteers and collaborators, each with a special interest satisfied through participation in the oak trail program. While "Learning Among the Oaks" has focused on educating school

  11. A case study of the development of environmental action projects from the framework of participatory action research within two middle school classrooms

    NASA Astrophysics Data System (ADS)

    Charmatz, Kim

    The purpose of this study was to understand student and teacher empowerment through a socially critical environmental education perspective. The main research question guiding this study was: How do participants make sense of a learning experience in which students design and carry out an environmental action project in their community? This study used participatory action research and critical theory as practical and theoretical frameworks. These frameworks were relevant as this study sought to examine social change, power, and relationships through participants' experiences. The context of this study was within one seventh and one eighth grade classroom participating in environmental projects. The study was conducted in spring 2005 with an additional follow-up data collection period during spring 2006. The school was located in a densely populated metropolitan suburb. Fifty-three students, a teacher researcher, and three science teachers participated. Data sources were written surveys, scores on Middle School Environmental Literacy Survey Instrument (MSELI), observations, interviews, and student work. This study used a mixed methodological approach. Quantitative data analysis involved dependent samples t-test scores on the MSELI before and after the completion of the projects. Qualitative data were analyzed using an inductive analysis approach. This study has implications for educators interested in democratic education. Environmental action projects provide a context for students and teachers to learn interdisciplinary content knowledge, develop personal beliefs, and learn ways to take action in their communities. This pedagogy has the potential to increase cooperation, communication, and tensions within school communities. Students' participation in the development of environmental action projects may lead to feelings of empowerment or being able to make a difference in their community, as an individual or member of a group. Future research is needed to discern

  12. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    SciTech Connect

    Not Available

    1993-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  13. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado

    SciTech Connect

    Not Available

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown.

  14. Wayne Interim Storage Site environmental report for calendar year 1992, 868 Black Oak Ridge Road, Wayne, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    SciTech Connect

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Wayne Interim Storage Site (WISS) and provides the results for 1992. The fenced, site, 32 km (20 mi) northwest of Newark, New Jersey, was used between 1948 and 1971 for commercial processing of monazite sand to separate natural radioisotopes - predominantly thorium. Environmental surveillance of WISS began in 1984 in accordance with Department of Energy (DOE) Order 5400.1 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). The environmental surveillance program at WISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; radium-226, radium-228, thorium-230, thorium-232, total uranium, and several chemicals in surface water and sediment; and total uranium, radium-226, radium-228, thorium-230, thorium-232, and organic and inorganic chemicals in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. This monitoring program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results for environmental surveillance in 1992 show that the concentrations of all radioactive and most chemical contaminants were below applicable standards.

  15. Landscape dynamics in Mediterranean oak forests under global change: understanding the role of anthropogenic and environmental drivers across forest types.

    PubMed

    Acácio, Vanda; Dias, Filipe S; Catry, Filipe X; Rocha, Marta; Moreira, Francisco

    2017-03-01

    The Mediterranean region is projected to be extremely vulnerable to global change, which will affect the distribution of typical forest types such as native oak forests. However, our understanding of Mediterranean oak forest responses to future conditions is still very limited by the lack of knowledge on oak forest dynamics and species-specific responses to multiple drivers. We compared the long-term (1966-2006) forest persistence and land cover change among evergreen (cork oak and holm oak) and deciduous oak forests and evaluated the importance of anthropogenic and environmental drivers on observed changes for Portugal. We used National Forest Inventories to quantify the changes in oak forests and explored the drivers of change using multinomial logistic regression analysis and an information theoretical approach. We found distinct trends among oak forest types, reflecting the differences in oak economic value, protection status and management schemes: cork oak forests were the most persistent (62%), changing mostly to pines and eucalypt; holm oak forests were less persistent (53.2%), changing mostly to agriculture; and deciduous oak forests were the least persistent (45.7%), changing mostly to shrublands. Drivers of change had distinct importance across oak forest types, but drivers from anthropogenic origin (wildfires, population density, and land accessibility) were always among the most important. Climatic extremes were also important predictors of oak forest changes, namely extreme temperatures for evergreen oak forests and deficit of precipitation for deciduous oak forests. Our results indicate that under increasing human pressure and forecasted climate change, evergreen oak forests will continue declining and deciduous oak forests will be replaced by forests dominated by more xeric species. In the long run, multiple disturbances may change competitive dominance from oak forests to pyrophytic shrublands. A better understanding of forest dynamics and the

  16. Interim Response Action Basin F Liquid Incineration Project Final Draft Human Health Risk Assessment. Volume 1.

    DTIC Science & Technology

    1991-07-01

    91222R02 2ND COPY Interim Response Action Basin F Liquid Incineration Project FINAL DRAFT HUMAN HEALTH RISK ASSESSMENT V olumne I Preplaced Remedial...The Use of OELs and NAAQSs for Calculating Inhalation RfJ)s 9-13 9.4.2.2 Adjustments to Inhalation RfDs 9-14 793C/FM V 7/22/91 TABLE OF CONTENTS...HENDERSON RTHOL THOL HAZELTIN A I LE-- f V , Rocky Mountain WELB DA Arsenal A"ADA AA -AIL- VIM IT RUM Doi T p- 0 Denver kl& MOR SHER DAN r go, "- V

  17. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    SciTech Connect

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  18. Community action for preventing HIV in Cambodia: evaluation of a 3-year project.

    PubMed

    Sopheab, Heng; Fylkesnes, Knut; Lim, Yi; Godwin, Peter

    2008-07-01

    The 'Community Action for Preventing HIV/AIDS Project' was implemented in four provinces in Cambodia (2001-04) to support a comprehensive set of HIV prevention efforts. Implementation was strictly monitored in terms of inputs, outputs and outcomes. We examine changes in these variables during the project period to assess the extent to which they were related to the project. Inputs and outputs were monitored regularly by supervision and quarterly project reports. Baseline and follow-up surveys were conducted on 10 target groups to measure changes in outcome indicators related to sexual risk behaviours, uses of HIV voluntary counselling and testing (VCT), self-reported sexually transmitted infections (STIs) and other indicators. The analyses use data from surveys and from project monitoring. Spending on HIV-related work at provincial level increased markedly, including investments in VCT, STI facilities and staff training. Yearly expenditure increased about 7-fold compared with years immediately preceding the project. VCT centres increased from 3 to 12, numbers of counsellors from 10 to 27, and numbers of client visits more than doubled. STI laboratory facilities increased from 0 to 6 with coverage of STI check-ups among sex workers increasing from 70% to 93% and a decline in men attending STI clinics. The survey results indicate significant changes in a number of major outcome indicators such as consistent condom use related to sex work (>80%), HIV testing and counselling after HIV tests, especially among police (42 to 72%, P < 0.001) and brothel-based sex workers (48 to 89%, P < 0.001). Self-reported STIs declined in most groups. Finally, the programmatic systems for planning, managing and monitoring implementation of activities at both central and provincial level, as well as technical guidelines, developed under the project have become the standard for the national programme. In conclusion, the project appears to have been comprehensive and a number of favourable

  19. The Union RAP: Industry-Wide Research-Action Projects to Win Health and Safety Improvements

    PubMed Central

    McQuiston, Thomas H.; Lippin, Tobi Mae; Anderson, Leeann G.; Beach, M. Josie; Frederick, James; Seymour, Thomas A.

    2009-01-01

    Unions are ripe to engage in community-based participatory research (CBPR). We briefly profile 3 United Steelworker CBPR projects aimed at uncovering often-undocumented, industry-wide health and safety conditions in which US industrial workers toil. The results are to be used to advocate improvements at workplace, industry, and national policy levels. We offer details of our CBPR approach (Research-Action Project [RAP]) that engages workers and others in all research stages. Elements of RAPs include strategically constructed teams with knowledge of the industry and health and safety and with skills in research, participatory facilitation, and training; reciprocal training on these knowledge and skill areas; iterative processes of large and small group work; use of technology; and facilitator-developed tools and intermediate products. PMID:19890145

  20. Quarry geotechnical report for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1990-11-01

    This report has been prepared for the United States Department of Energy's (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which is MK-Ferguson Company (MK-Ferguson) with Jacobs Engineering Group (JEG) as its designated subcontractor. The Weldon Spring site (WSS) comprises the Weldon Spring quarry area and the Weldon Spring chemical plant and raffinate pit areas. This report presents the results of geotechnical investigations conducted during 1989--1990 at the proposed Weldon Spring quarry staging and water treatment facilities in the quarry area. The facilities are intended for treatment of water removed from the quarry area. An access road and a decontamination pad will be necessary for handling and transportation of bulk waste. Results of previous geotechnical investigations performed by other geoscience and environmental engineering firms in the quarry area, were reviewed, summarized and incorporated into this report. Well logging, stratigraphy data, piezometer data, elevations, and soil characteristics are also included.

  1. Chicana feminist strategies in a participatory action research project with transnational Latina youth.

    PubMed

    Sánchez, Patricia

    2009-01-01

    This article discusses a participatory action research (PAR) project carried out with three transnational Latina youth in northern California and how the university researcher incorporated Chicana feminist strategies in the study. PAR and Chicana feminism place at the heart of research the knowledge that ordinary people produce, referring to this knowledge as conocimientos, or "homemade theory." The author discusses the project, the collaborative writing of a children's book based on two years of data collection, the challenges in being both an insider and an outsider to the community, how the youth created a counterstory based on their transnational immigrant lifestyle, and how an out-of-school setting promoted engaged research with urban teens.

  2. Engaging Students in a Simulated Collaborative Action Research Project: An Evaluation of a Participatory Approach to Learning

    ERIC Educational Resources Information Center

    Congdon, Graham John; Congdon, Shirley

    2011-01-01

    This article reports an action research project designed to develop and implement a new participatory learning and teaching approach to enable postgraduate healthcare students to develop skills and knowledge in preparation for undertaking an action research study within their practice setting. The learning and teaching approach was based upon the…

  3. Third annual environmental restoration monitoring and assessment report for FY 1994 of the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Clapp, R.B.; Watts, J.A.; Guth, M.A.S.

    1994-09-01

    This report summarizes the salient features of the annual efforts of environmental monitoring, field investigations, and assessments conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, providing an ORNL site-wide perspective on types, distribution, and transport of contamination. The results presented are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) Project. WAG 2 is the lower portion of the White Oak Creek system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The Remedial Investigation Plan (DOE 1992) for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2`s role as an integrator and the major conduit of contaminants from the ORNL site. During FY 1992, the remedial investigation activities were integrated with a series of environmental monitoring and SI activities at ORNL that address pathways and processes important for contaminant movement to gain a more integrated perspective of contamination movement at the watershed scale.

  4. International concerted action on collaboration in telemedicine: G8 sub-project 4.

    PubMed

    Lacroix, A

    1999-01-01

    The main objective of G-7/8 Global Healthcare Applications sub-project 4 is to enable an international concerted action on collaboration in telemedicine. To promote and facilitate the implementation of telemedicine or health telematics networks around the world, it was felt necessary to solve certain key issues. Five thematic solution-seeking FORUMS are each addressing a specific item. The first FORUM held in Montréal, Canada on May 28-30 1998 focussed on Interoperability of telemedicine and telehealth systems. Other FORUMS address other themes such as: Impacts of Telemedicine on health care management (Regensburg, Germany, November 21-23 1998); Evaluation and Cost Effectiveness of Telemedicine (Melbourne, Australia, February 19-20 1999); Clinical and technical quality and standards (Washington, USA, April 29-30 1999); Medico-legal aspects of national and international applications (Oxford, UK, fall 1999). The main objective of these FORUMS is to arrive at best practices through consultation amongst experts who seek together the best solutions to facilitate global international telemedicine networks. Towards this goal, G-8 sub-project-4 will also conduct the IMPACT (International Multipoint Project of Advanced Communication in Telemedicine) feasibility study which will aim at conducting multipoint exchanges between telemedicine units in the academic centers of the participating G-8 and other countries. More detailed information on this project and summaries of the initial FORUMS are found on our Web site at www.g7sp4.org.

  5. Conversion of an oak seed orchard to oak silvopasture

    Treesearch

    K. Connor; L. Dimov; R. Barlow; M. Smith; E. Kirkland

    2013-01-01

    The potential of hardwood silvopasture has yet to be realized in the Southeastern United States. The decommissioning of the Stauffer Nursery, Opelika, AL, provided the opportunity to intensively research hardwood silvopasture using various oak species. Average crown diameter ranged from 5.9 feet in white oak (Quercus alba) to 10.7 feet in Nuttall oak...

  6. Oak wilt and oak decline in the upper midwest USA

    Treesearch

    Jennifer Juzwik; Thomas L. Schmidt

    2000-01-01

    Oaks are a significant component of the hardwood forests of the Upper Midwest USA. Numerous species occur over vast areas in the region and are highly valued for a variety of reasons. Oak wilt caused by C. fagacearum, and oak decline associated with several factors are the major causes of the species, deterioration and death in the region....

  7. Sudden oak death disease progression in oaks and tanoaks

    Treesearch

    Brice A. McPherson; Sylvia R. Mori; David L. Wood; Andrew J. Storer; Pavel Svihra; N. Maggi Kelly; Richard B. Standiford

    2006-01-01

    In March 2000, we established twenty disease progression plots in Marin County to monitor the progress of sudden oak death symptoms in coast live oak (Quercus agrifolia), California black oak (Q. kelloggii), and tanoak (Lithocarpus densiflorus) (McPherson and others 2005). Plots were located to encompass a...

  8. ALARA plan for the Old Hydrofracture Facility tanks contents removal project at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Amendment 1 for Appendix B: Install flex-pipe on tank riser spools

    SciTech Connect

    1998-05-13

    This amendment to Appendix B contains the specific ALARA evaluations for installing flex-pipe on riser spools to accommodate ventilation duct connections to the north risers of each tank. The work will be a routine task that is part of the Equipment Installation and Mobilization phase of the project. The dose rates were estimated using the recent Radiological Surveillance Section radiological survey: SAAS-97-063S. Task B-6 has been added to the OHF Project ALARA review process to address a field decision to modify an approach to installing the tank ventilation system. The revised approach will incorporate 12-in. diameter, 36-in. long, stainless steel flex-pipe connected to each north riser spool to address the problem of pipe fitting multiple bends and turns expected with the 12-in. PVC duct. This improved approach will reduce the time necessary to install the duct system between the tanks and the ventilation skid. However, the task includes opening the 12-in. riser spool connections to replace the currently installed blind gaskets. Since a riser spool for each tank will be opened, there is a potential for significant personnel exposure and spread of contamination that will addressed through this ALARA review process.

  9. Poison ivy - oak - sumac rash

    MedlinePlus

    ... this page: //medlineplus.gov/ency/article/000027.htm Poison ivy - oak - sumac rash To use the sharing features on this page, please enable JavaScript. Poison ivy, oak, and sumac are plants that commonly ...

  10. Developing effective assignment feedback for an interprofessional learning module-An action research project.

    PubMed

    Strudwick, Ruth; Day, Jane

    2015-09-01

    The first year interprofessional learning module at University Campus Suffolk (UCS) is delivered to 300 students and the students' assignments are marked by 20 members of staff from different health and social care professions. We were keen to find a way to reduce any inconsistencies and work with both staff and students to ensure that the essay and subsequent feedback were useful for all involved. The aims of the project were to evaluate the current marking process and feedback sheets used for year one inter-professional learning (IPL) marking, and to develop an appropriate marking tool and feedback sheet that would enable markers to provide more consistent feedback to the students. Participatory action research was used with both students and staff members being involved. Focus group and questions were used to ascertain views about the assignment feedback. The feedback from this action learning project helped us to enhance the feedback for students. There was also an increase in engagement with the assessment and feedback process amongst both staff and students. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. INDEPENDENT VERIFICATION OF THE CENTRAL CAMPUS AND SOUTHEAST LABORATORY COMPLEX BUILDING SLABS AT OAK RIDGE NATIONAL LABORATORY, OAK RIDGE, TENNESSEE

    SciTech Connect

    Weaver, Phyllis C.

    2012-07-24

    Oak Ridge Associated Universities/Oak Ridge Institute for Science and Education (ORAU/ORISE) has completed the independent verification survey of the Central Campus and Southeast Lab Complex Building Slabs. The results of this effort are provided. The objective of this verification survey was to provide independent review and field assessment of remediation actions conducted by SEC, and to independently assess whether the final radiological condition of the slabs met the release guidelines.

  12. Science in Action: How Middle School Students Are Changing Their World through STEM Service-Learning Projects

    ERIC Educational Resources Information Center

    Newman, Jane L.; Dantzler, John; Coleman, April N.

    2015-01-01

    The purpose of Science in Action (SIA) was to examine the relationship between implementing quality science, technology, engineering, and math (STEM) service-learning (SL) projects and the effect on students' academic engagement in middle school science, civic responsibility, and resilience to at-risk behaviors. The innovative project funded by…

  13. Teacher Action Research Teams: Building Collaborative Structures for Schools: A Report from the Schools Reaching Out Project.

    ERIC Educational Resources Information Center

    Krasnow, Jean H.

    A teacher action research study, undertaken as part of the larger Schools Reaching Out (SRO) project, sponsored by the Institute for Responsive Education, is described in this report. The project is based on the concept of the urban school, family, and community partnership as a means to improve all children's academic achievement and social…

  14. Science in Action: How Middle School Students Are Changing Their World through STEM Service-Learning Projects

    ERIC Educational Resources Information Center

    Newman, Jane L.; Dantzler, John; Coleman, April N.

    2015-01-01

    The purpose of Science in Action (SIA) was to examine the relationship between implementing quality science, technology, engineering, and math (STEM) service-learning (SL) projects and the effect on students' academic engagement in middle school science, civic responsibility, and resilience to at-risk behaviors. The innovative project funded by…

  15. Silvicultural methods for regenerating oaks

    Treesearch

    F. Bryan Clark; Richard F. Watt

    1971-01-01

    Advance reproduction is the key to forming the new oak stand. However, the size or strength of the advance stems is just as important as number. Most oak stands approaching maturity have enough advance reproduction, but many do not. In such cases, harvest cuttings must be delayed and overstory densities regulated to favor the establishment and development of new oaks...

  16. The historical significance of oak

    Treesearch

    J. V. Thirgood

    1971-01-01

    A brief history of the importance of oak in Europe, contrasting the methods used in France and Britain to propagate the species and manage the forests for continued productivity. The significance of oak as a strategic resource during the sailing-ship era is stressed, and mention is made of the early development of oak management in North America. The international...

  17. Poison Ivy/Oak/Sumac

    MedlinePlus

    ... Your 1- to 2-Year-Old First Aid: Poison Ivy/Oak/Sumac KidsHealth > For Parents > First Aid: Poison Ivy/Oak/Sumac Print A A A The oil in poison ivy /oak/sumac plants (called urushiol ) can cause ...

  18. Upland Oak Regeneration and Management

    Treesearch

    David L. Loftis

    2004-01-01

    In oak-dominated plant communities and in other communities where oaks are important, the keys to natural regeneration of upland oak components are (1) to ensure presence of competitive regeneration sources, and (2) to provide timely, sufficient release of these sources. Regeneration sources vary significantly among different types of plant communities and disturbance...

  19. Scarlet Oak Sawfly (Pest Alert)

    Treesearch

    USDA Forest Service

    1998-01-01

    The scarlet oak sawfly, Caliroa quercuscoccineae (Dyar) skeletonizes leaves of scarlet, black, pin, and white oaks in eastern North America. It is also called the oak slug sawfly because of the fact that the larvae are covered with a coat of slime that helps them adhere to foliage.

  20. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1

    SciTech Connect

    Findlay, Rick

    2006-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.

  1. Participants' perceptions of an intervention implemented in an Action Research Nursing Documentation Project.

    PubMed

    Vabo, Grete; Slettebø, Åshild; Fossum, Mariann

    2017-04-01

    The aim of this study is to describe healthcare professionals' experiences and perceptions of an intervention implemented in an action research project conducted to improve nursing documentation practices in four municipalities in Norway. Documentation of individualized patient care is a continuing concern in healthcare services and could impacts the quality and safety of healthcare. Use of electronic systems has made some aspects of documentation more comprehensive, but creation of an individualized care plan remains a pressing issue. A qualitative descriptive design was used. An action research project was conducted between 2010-2012 to improve the content and quality of nursing documentation in community healthcare services in four municipalities. One year after the project was completed four focus group interviews were conducted with healthcare professionals, one for each involved municipality. Two unit managers were interviewed individually. Qualitative content analysis was used. Three themes emerged: healthcare professionals perceived competing interest; they experienced that they had to manage complexity and changes; and they highlighted a clear and visible leader as important for success. Quality improvement activities are essential. Healthcare professionals experience a complicated situation when electronic health record systems do not support workflow. Further research is recommended to focus on the functionality and user interface of electronic health record systems, and on the role of leadership when implementing changes in clinical practice. Stronger cooperation among policymakers, electronic health record system vendors, and healthcare professionals is essential for improving electronic health record systems and documentation practices. Involvement of end-users in these improvements can make a difference in the way the systems are perceived in the clinical workflow. © 2016 John Wiley & Sons Ltd.

  2. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995

    SciTech Connect

    1995-12-01

    This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  3. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    SciTech Connect

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE.

  4. Ten years of oak restoration in city of Walnut Creek open spaces

    Treesearch

    Ralph Kraetsch

    2002-01-01

    The Oak Habitat Restoration Project began in 1991 when several individuals recognized that the oak woodlands and savannas of Walnut Creek's nearly 2,800 acres of open spaces had little natural regeneration. This group gathered volunteers who harvested acorns, planted them, and then installed tree shelters and watered the resulting seedlings. The Project soon...

  5. Sampling and Analysis Plan for White Oak Creek Watershed Remedial Investigation supplemental sampling, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1996-05-01

    This Sampling and Analysis (SAP) presents the project requirements for proposed soil sampling to support the White Oak Creek Remedial Investigation/Feasibility Study at Oak Ridge National Laboratory. During the Data Quality Objectives process for the project, it was determined that limited surface soils sampling is need to supplement the historical environmental characterization database. The primary driver for the additional sampling is the need to identify potential human health and ecological risks at various sites that have not yet proceeded through a remedial investigation. These sites include Waste Area Grouping (WAG)3, WAG 4, WAG 7, and WAG 9. WAG 4 efforts are limited to nonradiological characterization since recent seep characterization activities at the WAG have defined the radiological problem there.

  6. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    SciTech Connect

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  7. Releases of Contaminants from Oak Ridge Facilities and Risks to Public Health; Final Report of the Oak Ridge Health Agreement Steering Panel

    SciTech Connect

    Alexander, James; Brooks, Barbara; Erwin, Paul; Hamilton, Joseph; Holloway, Jacqueline; Lipford, Patrick; Morin, Norma; Peelle, Robert; Smith, James; Voilleque, Paul; Zawia, Nasser; Williams, Leo

    1999-12-01

    In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. The following report, "Releases of Contaminants from Oak Ridge Facilities and Risks to Public Health," was written by the Oak Ridge Health Agreement Steering Panel (ORHASP) for the following purposes: (1) to explain the components and process of the lengthy, complex study; (2) to summarize important study results in less technical language; and (3) to provide the State with the Panel's recommendations for future actions concerning the Oak Ridge communities.The dose reconstruction process involved the examination of thousands of historical records to obtain information relating to past operations at each facility. It resulted in hundreds of documents being declassified and provided an avenue for a complete public accounting of past practices and releases. Researchers used this information to identify released contaminants of concern, to estimate the quantity and timing of these releases, to evaluate the routes taken by contaminants through the environment to nearby populations, and to estimate the doses and health risks to exposed groups.The results suggest it is likely that some people's risks of developing various types of cancers or other health effects were increased because of the releases. Two groups were most likely to have been harmed: local children drinking milk, in the early 1950's, from a "backyard" cow or goat that had grazed on pastures contaminated with iodine-131, and fetuses carried in the 1950's and early 1960's by women who routinely ate fish taken from nearby creeks and rivers

  8. Discoloration & decay in oak

    Treesearch

    Alex L. Shigo

    1971-01-01

    Diseases that result in discoloration and decay of wood are major problems affecting all species of oak. Wounds often start the processes that can lead to these diseases. The type and severity of the wound, the vigor of the tree, the environment, and the aggressiveness of microorganisms that infect are some of the most important factors that determine the nature of the...

  9. Oak management in California

    Treesearch

    Plumb. Timothy R.; Philip M. McDonald

    1981-01-01

    Native oak species grow on 15 to 20 million acres (6 to 8 million ha) of California land, and have an estimated net volume of about 3 billion ft3 (85 million m3). This resource, valuable not only for traditional wood products, but also for wildlife habitat, watershed protection, and recreational-esthetic values, is not...

  10. The oak wilt situation

    Treesearch

    William H. Gillespie

    1971-01-01

    Although oak wilt has been studied for more than 30 years, there are many facets of the disease that are little understood. Continuing Federal-State cooperative studies are geared to predicting the overall effects of the disease on future forest management programs, but much additional research is needed before present control programs can be expanded or discarded in a...

  11. Why sustain oak forests?

    Treesearch

    David Wm. Smith

    2006-01-01

    A brief overview and some personal thoughts are offered that deal with the implications of our social and political systems on the long-term sustainability of our forest resources. The connection of the most recent climatic events, in a geologic-time context, to the development of present day oak dominated forests of the Eastern United States is discussed. The impacts...

  12. Oak Ridge reservation land-use plan

    SciTech Connect

    Bibb, W. R.; Hardin, T. H.; Hawkins, C. C.; Johnson, W. A.; Peitzsch, F. C.; Scott, T. H.; Theisen, M. R.; Tuck, S. C.

    1980-03-01

    This study establishes a basis for long-range land-use planning to accommodate both present and projected DOE program requirements in Oak Ridge. In addition to technological requirements, this land-use plan incorporates in-depth ecological concepts that recognize multiple uses of land as a viable option. Neither environmental research nor technological operations need to be mutually exclusive in all instances. Unique biological areas, as well as rare and endangered species, need to be protected, and human and environmental health and safety must be maintained. The plan is based on the concept that the primary use of DOE land resources must be to implement the overall DOE mission in Oak Ridge. This document, along with the base map and overlay maps, provides a reasonably detailed description of the DOE Oak Ridge land resources and of the current and potential uses of the land. A description of the land characteristics, including geomorphology, agricultural productivity and soils, water courses, vegetation, and terrestrial and aquatic animal habitats, is presented to serve as a resource document. Essentially all DOE land in the Oak Ridge area is being fully used for ongoing DOE programs or has been set aside as protected areas.

  13. Inconsistencies in findings from the early lung cancer action project studies of lung cancer screening.

    PubMed

    Bach, Peter B

    2011-07-06

    Long-standing guidelines against screening high-risk individuals for lung cancer may change following the publication of the randomized National Lung Screening Trial (NLST), which shows a benefit of computed tomography compared with chest x-ray screening. Guideline panels will likely also seek additional information from nonrandomized studies of computed tomography screening, such as the Early Lung Cancer Action Project (ELCAP). However, for the ELCAP findings to be incorporated into new guidelines, some inconsistencies in the published data should first be resolved. Specifically, some of the reports from ELCAP appear to contradict others in terms of important endpoints, and several findings from ELCAP appear to be statistically improbable or outliers when compared with analyses and studies by other research groups. Clarification of both internal and external inconsistencies is a prerequisite for evaluation of the body of work published by ELCAP investigators.

  14. Screening of contaminants in Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect

    Blaylock, B.G.; Frank, M.L.; Hoffman, F.O.; Hook, L.A.; Suter, G.W.; Watts, J.A.

    1992-07-01

    Waste Area Grouping 2 (WAG 2) of the Oak Ridge National Laboratory (ORNL) is located in the White Oak Creek Watershed and is composed of White Oak Creek Embayment, White Oak Lake and associated floodplain, and portions of White Oak Creek (WOC) and Melton Branch downstream of ORNL facilities. Contaminants leaving other ORNL WAGs in the WOC watershed pass through WAG 2 before entering the Clinch River. Health and ecological risk screening analyses were conducted on contaminants in WAG 2 to determine which contaminants were of concern and would require immediate consideration for remedial action and which contaminants could be assigned a low priority or further study. For screening purposes, WAG 2 was divided into four geographic reaches: Reach 1, a portion of WOC; Reach 2, Melton Branch; Reach 3, White Oak Lake and the floodplain area to the weirs on WOC and Melton Branch; and Reach 4, the White Oak Creek Embayment, for which an independent screening analysis has been completed. Screening analyses were conducted using data bases compiled from existing data on carcinogenic and noncarcinogenic contaminants, which included organics, inorganics, and radionuclides. Contaminants for which at least one ample had a concentration above the level of detection were placed in a detectable contaminants data base. Those contaminants for which all samples were below the level of detection were placed in a nondetectable contaminants data base.

  15. Oak Ridge 25-MV tandem accelerator

    SciTech Connect

    Ziegler, N.F.; Richardson, E.G.; Mann, J.E.; Juras, R.C.; Jones, C.M.; Biggerstaff, J.A.; Benjamin, J.A.

    1981-01-01

    A new heavy-ion accelerator facility is nearing completion at the Oak Ridge National Laboratory. This paper presents a brief description of the scope and status of this project and a discussion of some aspects of the first operational experience with the 25 MV tandem accelerator which is being provided by the National Electrostatics Corporation (NEC) as a major component of the first phase of the facility.

  16. Hydrologic data summary for the White Oak Watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee, October 1990--December 1991

    SciTech Connect

    Borders, D.M.; Gregory, S.M.; Clapp, R.B.; Frederick, B.J.; Watts, J.A.

    1992-06-01

    This report summarizes for the 15-month period of October 1990-- December 1991 the available dynamic hydrologic data collected, primarily on the White Oak Creek (WOC) watershed, along with information collected on the surface flow systems that affect the quality or quantity of surface water. The collection of hydrologic data is one component of numerous, ongoing Oak Ridge National Laboratory (ORNL) environmental studies and monitoring programs and is intended to: (1) characterize the quantity and quality of water in the flow systems; (2) assist with the planning and assessment of remedial action activities; and, (3) provide long-term availability of data and quality assurance. Characterization of the hydrology of the WOC watershed is critical for understanding the processes that drive contaminant transport in the watershed. Identification of spatial and temporal trends in hydrologic parameters and mechanisms that affect the movement of contaminants supports the development of interim corrective measures and remedial restoration alternatives. In addition, hydrologic monitoring supports long-term assessment of the effectiveness of remedial actions in limiting the transport of contaminants across Waste Area Grouping (WAG) boundaries and ultimately to the off-site environment. For these reasons, it is of paramount importance to the Environmental Restoration Program (ERP) to collect and report hydrologic data activities that contribute to the Site Investigations component of the ERP. (White Oak Creek is also referred to as ``Whiteoak`` Creek).

  17. Hydrologic data summary for the White Oak Watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee, October 1990--December 1991

    SciTech Connect

    Borders, D.M.; Gregory, S.M.; Clapp, R.B.; Frederick, B.J.; Watts, J.A.

    1992-06-01

    This report summarizes for the 15-month period of October 1990-- December 1991 the available dynamic hydrologic data collected, primarily on the White Oak Creek (WOC) watershed, along with information collected on the surface flow systems that affect the quality or quantity of surface water. The collection of hydrologic data is one component of numerous, ongoing Oak Ridge National Laboratory (ORNL) environmental studies and monitoring programs and is intended to: (1) characterize the quantity and quality of water in the flow systems; (2) assist with the planning and assessment of remedial action activities; and, (3) provide long-term availability of data and quality assurance. Characterization of the hydrology of the WOC watershed is critical for understanding the processes that drive contaminant transport in the watershed. Identification of spatial and temporal trends in hydrologic parameters and mechanisms that affect the movement of contaminants supports the development of interim corrective measures and remedial restoration alternatives. In addition, hydrologic monitoring supports long-term assessment of the effectiveness of remedial actions in limiting the transport of contaminants across Waste Area Grouping (WAG) boundaries and ultimately to the off-site environment. For these reasons, it is of paramount importance to the Environmental Restoration Program (ERP) to collect and report hydrologic data activities that contribute to the Site Investigations component of the ERP. (White Oak Creek is also referred to as Whiteoak'' Creek).

  18. Mobile water treatment plant special study. Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    Not Available

    1992-12-01

    Characterization of the level and extent of groundwater contamination in the vicinity of Title I mill sites began during the surface remedial action stage (Phase 1) of the Uranium Mill Tailings Remedial Action (UMTRA) Project. Some of the contamination in the aquifer(s) at the abandoned sites is attributable to milling activities during the years the mills were in operation. To begin implementation of Phase 11 groundwater remediation, the US Department of Energy (DOE) requested that (1) the Technical Assistance Contractor (TAC) conduct a study to provide for the design of a mobile water treatment plant to treat groundwater extracted during site characterization studies at completed Phase I UMTRA sites, and (2) the results of the TAC investigations be documented in a special study report. This special study develops the design criteria for a water treatment plant that can be readily transported from one UMTRA site to another and operated as a complete treatment system. The 1991 study provides the basis for selecting a mobile water treatment system to meet the operating requirements recommended in this special study. The scope of work includes the following: Determining contaminants, flows, and loadings. Setting effluent quality criteria. Sizing water treatment unit(s). Evaluating non-monetary aspects of alternate treatment processes. Comparing costs of alternate treatment processes. Recommending the mobile water treatment plant design criteria.

  19. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    SciTech Connect

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE`s satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson.

  20. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    SciTech Connect

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete.

  1. Effect of Selected Modeling Assumptions on Subsurface Radionuclide Transport Projections for the Potential Environmental Management Disposal Facility at Oak Ridge, Tennessee

    SciTech Connect

    Painter, Scott L.

    2016-06-28

    The Department of Energy’s Office of Environmental Management recently revised a Remedial Investigation/ Feasibility Study (RI/FS) that included an analysis of subsurface radionuclide transport at a potential new Environmental Management Disposal Facility (EMDF) in East Bear Creek Valley near Oak Ridge, Tennessee. The effect of three simplifying assumptions used in the RI/FS analyses are investigated using the same subsurface pathway conceptualization but with more flexible modeling tools. Neglect of vadose zone dispersion was found to be conservative or non-conservative, depending on the retarded travel time and the half-life. For a given equilibrium distribution coefficient, a relatively narrow range of half-life was identified for which neglect of vadose zone transport is non-conservative and radionuclide discharge into surface water is non-negligible. However, there are two additional conservative simplifications in the reference case that compensate for the non-conservative effect of neglecting vadose zone dispersion: the use of a steady infiltration rate and vadose zone velocity, and the way equilibrium sorption is used to represent transport in the fractured material of the saturated aquifer. With more realistic representations of all three processes, the RI/FS reference case was found to either provide a reasonably good approximation to the peak concentration or was significantly conservative (pessimistic) for all parameter combinations considered.

  2. Towards a Reflection Repertoire: Using a Thinking Tool to Understand Tensions in an Action Research Project

    ERIC Educational Resources Information Center

    Aas, Marit

    2014-01-01

    Most action researchers agree that action research consists of cycles of planning, acting, reflecting, and taking further action. However, in action research literature, there is something missing. The nature of reflection in the action research process, including its relationship with the tensions that arise while discussing purposes, processes,…

  3. Towards a Reflection Repertoire: Using a Thinking Tool to Understand Tensions in an Action Research Project

    ERIC Educational Resources Information Center

    Aas, Marit

    2014-01-01

    Most action researchers agree that action research consists of cycles of planning, acting, reflecting, and taking further action. However, in action research literature, there is something missing. The nature of reflection in the action research process, including its relationship with the tensions that arise while discussing purposes, processes,…

  4. Bentonite-amended soil special study. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1989-12-01

    This special study was conducted to assess the viability of soil with a high percentage of bentonite added as an infiltration barrier in the cover of Uranium Mill Tailings Remedial Action (UMTRA) Project disposal cells. To achieve maximum concentration limits (MCLs) at several UMTRA Project sites, covers with a very low permeability are needed. If alternate concentration limits (ACLs) are the appropriate site groundwater compliance strategy, the US Department of Energy (DOE) is required to demonstrate, among other things, that the infiltration to the disposal cell is as low as reasonably achievable, and hence that the cover has a very low permeability. When the study discussed here was begun, the lowest permeability element available was CLAYMAX[sub R], a manufactured liner material constructed of natural material (bentonite clay) between two geosynthetics.The strength of soil-bentonite mixes was measured to see if they could be placed on sideslopes and not pose stability problems. Also evaluated were the hydraulic conductivities of soil-bentonite mixes. If the strengths and permeabilities of soils with a high percentage of bentonite are favorable, the soils may be used as infiltration barriers in current cover designs without changing pile geometries. The scope of work for this study called for a literature review and a two-phased laboratory testing program. This report presents the results of the literature review and the first phase of the testing program.

  5. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada, Rev. No.: 0

    SciTech Connect

    Rick Findlay

    2006-09-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation.

  6. The cycle of homelessness in the lives of young mothers: the diagnostic phase of an action research project.

    PubMed

    Walters, S; East, L

    2001-03-01

    This paper presents the findings of the first stage of an action research project designed to explore the experience of repeated homelessness in the lives of young women. An action research strategy was selected because it offered a framework within which to work with and for rather than on this vulnerable group of service users. The women participating in the research developed a conceptual model that captured the essence of their experience, which they named 'Our Cycle'. They also proposed a system for service delivery, 'From trauma to recovery: a non-professional model'. The diagnostic phase of the action research has thus resulted in a sound theoretical and practical framework to guide the implementation and evaluation stages of the project, currently being funded through the United Kingdom Department of Health's Health Action Zone initiative.

  7. Foliar nutrients explain goldspotted oak borer, Agrilus auroguttatus, adult feeding preference among four California oak species

    Treesearch

    Yigen. Chen; Tom. W. Coleman; Michael. I. Jones; Mary. L. Flint; Steven. J. Seybold

    2013-01-01

    Adults of the invasive goldspotted oak borer, Agrilus auroguttatus Schaeffer (Coleoptera: Buprestidae), consumed foliar weight in no-choice feeding tests of, in descending order, California black oak Quercus kelloggii Newb., Engelmann oak, Quercus engelmannii Greene, coast live oak, Quercus...

  8. Removal site evaluation report on the Tower Shielding Facility at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1996-09-01

    This removal site evaluation report for the Tower Shielding Facility (TSF) at Oak Ridge National Laboratory was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the Tower Shielding Facility pose a substantial risk to human health or the environment (i.e., a high probability of adverse effects) and if remedial site evaluations or removal actions are, therefore, required. The scope of the project included a review of historical evidence regarding operations and use of the facility; interviews with facility personnel concerning current and past operating practices; a site inspection; and identification of hazard areas requiring maintenance, removal, or remedial actions. Based an the findings of this removal site evaluation, adequate efforts are currently being made at the TSF to contain and control existing contamination and hazardous substances on site in order to protect human health and the environment No conditions requiring maintenance or removal actions to mitigate imminent or potential threats to human health and the environment were identified during this evaluation. Given the current conditions and status of the buildings associated with the TSF, this removal site evaluation is considered complete and terminated according to the requirements for removal site evaluation termination.

  9. D and D alternatives risk assessment for Building 3515 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Robers, S.K.; Golden, K.M.

    1995-09-01

    This report presents the results of the Level 3 Decontamination and Decommissioning (D and D) Alternatives Risk Assessment (DARA) performed on Building 3515 located at the Oak Ridge National Laboratory (ORNL). The goal of the risk evaluation process is to provide risk information necessary to assist decision making for Environmental Restoration (ER) Program D and D facilities. This risk information is developed in the baseline risk assessment (BRA) and in the DARA. The BRA provides risk information necessary for determining whether or not a facility represents an unacceptable risk and requires remediation. In addition, the BRA also provides an estimation of the risks associated with the no-action alternative for use in the DARA. The objective of this Level 3 DARA is to evaluate and document the potential risks to human health, human safety, and the environment associated with the proposed remedial action at Building 3515. A Level 3 assessment is the least rigorous type of DARA. The decision to conduct a Level 3 DARA was based on the fact that characterization data from the facility are limited, and currently only one remedial alternative (complete dismantlement) is being evaluated in addition to the no-action alternative. The results of the DARA along with cost and engineering information may be used by project managers in making decisions regarding the final disposition of Building 3515. This Level 3 assessment meets the requirements of the streamlined risk assessment necessary for an Engineering Evaluation/Cost Analysis (EE/CA).

  10. The Impact of a Dual-Project Action Learning Program: A Case of a Large IT Manufacturing Company in South Korea

    ERIC Educational Resources Information Center

    Yoon, Hyung Joon; Cho, Yonjoo; Bong, Hyeon-Cheol

    2012-01-01

    The primary purpose of this article is to evaluate the impact of a dual-project action learning program (DPALP) conducted in South Korea. A dual-project program requires each participant to carry out both team and individual projects. Cho and Egan's [2009. Action learning research: A systematic review and conceptual framework. "Human Resource…

  11. The Impact of a Dual-Project Action Learning Program: A Case of a Large IT Manufacturing Company in South Korea

    ERIC Educational Resources Information Center

    Yoon, Hyung Joon; Cho, Yonjoo; Bong, Hyeon-Cheol

    2012-01-01

    The primary purpose of this article is to evaluate the impact of a dual-project action learning program (DPALP) conducted in South Korea. A dual-project program requires each participant to carry out both team and individual projects. Cho and Egan's [2009. Action learning research: A systematic review and conceptual framework. "Human Resource…

  12. Sudden Oak Death - Western (Pest Alert)

    Treesearch

    Susan Frankel

    2002-01-01

    Tens of thousands of tanoak (Lithocarpus densiflorus), coast live oak (Quercus agrifolia), California black oak (Quercus kelloggii), Shreve oak (Quercus parvula var. shrevei), and madrone (Arbutus menziesii) have been killed by a newly identified species, Phytophthora ramorum, which causes Sudden Oak Death. Sudden Oak Death was first reported in 1995 in central coastal...

  13. Vegetation Change in Blue Oak Woodlands in California

    Treesearch

    Barbara A. Holzman; Barbara H. Allen-Diaz

    1991-01-01

    A preliminary report of a statewide project investigating vegetation change in blue oak (Quercus douglasii) woodlands in California is presented. Vegetation plots taken in the 1930s, as part of a statewide vegetation mapping project, were relocated and surveyed. Species composition, cover and tree stand structure data from the earlier study were...

  14. Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee

    SciTech Connect

    Peterson, M.J.

    2005-12-20

    This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected

  15. Oak mortality associated with crown dieback and oak borer attack in the Ozark Highlands

    Treesearch

    Zhaofei Fan; John M. Kabrick; Martin A. Spetich; Stephen R. Shifley; Randy G. Jensen

    2008-01-01

    Oak decline and related mortality have periodically plagued upland oak–hickory forests, particularly oak species in the red oak group, across the Ozark Highlands of Missouri, Arkansas and Oklahoma since the late 1970s. Advanced tree age and periodic drought, as well as Armillaria root fungi and oak borer attack are believed to contribute to oak decline and mortality....

  16. Oak mortality associated with crown dieback and oak borer attack in the Ozark Highlands

    Treesearch

    Zhaofei Fan; John M. Kabrick; Martin A. Spetich; Stephen R. Shifley; Randy G. Jensen

    2008-01-01

    Oak decline and related mortality have periodically plagued upland oak-hickory forests, particularly oak species in the red oak group, across the Ozark Highlands of Missouri, Arkansas and Oklahoma since the late 1970s. Advanced tree age and periodic drought, as well as Armillaria root fungi and oak borer attack are believed to contribute to oak decline and mortality....

  17. Nurse-led action research project for expanding nurses' role in patient education in Iran: Process, structure, and outcomes.

    PubMed

    Khorasani, Parvaneh; Rassouli, Maryam; Parvizy, Soroor; Zagheri-Tafreshi, Mansoureh; Nasr-Esfahani, Mahmood

    2015-01-01

    Patient education is among the lowest met need of patients in Iran; therefore, expansion of that role can result in greater professional accountability. This study aimed to explain the practical science of the process, structure, and outcomes of a nurse-led action research project to expand the nurses' role in patient education in Iran. This study was part of a participatory action research. Daily communications and monthly joint meetings were held from January 2012 to February 2014 for planning and management. These were based on the research protocol, and the conceptual framework included the Mobilizing for Action through Planning and Partnerships process by means of Leadership for Change skills. Data were produced and gathered through participant observations. Administrative data included project records, official documents, artifacts, news, and reports, which were analyzed through qualitative content analysis. A participatory project was established with three groups of participants organized from both academic and clinical fields. These consisted of a "core research support team," "two steering committees," and community representatives of clients and professionals as "feedback groups." A seven-stage process, named the "Nurse Educators: Al-Zahra Role Expansion Action Research" (NEAREAR) process, resulted from the project, in which strategic issues were gradually developed and implemented through 32 action plans and quality improvement cycles of action research. Audits and supervision evaluations showed meaningful changes in capacity building components. A nurse-led ad hoc structure with academic-clinical partnerships and strategic management process was suggested as a possible practical model for expanding nurses' educational role in similar contexts. Implications and practical science introduced in this action research could also be applicable for top managers and health system policy makers in a wider range of practice.

  18. Nurse-led action research project for expanding nurses’ role in patient education in Iran: Process, structure, and outcomes

    PubMed Central

    Khorasani, Parvaneh; Rassouli, Maryam; Parvizy, Soroor; Zagheri-Tafreshi, Mansoureh; Nasr-Esfahani, Mahmood

    2015-01-01

    Background: Patient education is among the lowest met need of patients in Iran; therefore, expansion of that role can result in greater professional accountability. This study aimed to explain the practical science of the process, structure, and outcomes of a nurse-led action research project to expand the nurses’ role in patient education in Iran. Materials and Methods: This study was part of a participatory action research. Daily communications and monthly joint meetings were held from January 2012 to February 2014 for planning and management. These were based on the research protocol, and the conceptual framework included the Mobilizing for Action through Planning and Partnerships process by means of Leadership for Change skills. Data were produced and gathered through participant observations. Administrative data included project records, official documents, artifacts, news, and reports, which were analyzed through qualitative content analysis. Results: A participatory project was established with three groups of participants organized from both academic and clinical fields. These consisted of a “core research support team,” “two steering committees,” and community representatives of clients and professionals as “feedback groups.” A seven-stage process, named the “Nurse Educators: Al-Zahra Role Expansion Action Research” (NEAREAR) process, resulted from the project, in which strategic issues were gradually developed and implemented through 32 action plans and quality improvement cycles of action research. Audits and supervision evaluations showed meaningful changes in capacity building components. Conclusions: A nurse-led ad hoc structure with academic–clinical partnerships and strategic management process was suggested as a possible practical model for expanding nurses’ educational role in similar contexts. Implications and practical science introduced in this action research could also be applicable for top managers and health system

  19. Purple martins in oak woodlands

    Treesearch

    Brian D. C. Williams

    2002-01-01

    Purple martins are cavity-nesting swallows that once nested fairly widely in California’s oak woodlands but are now rare in that habitat. The old oaks of the Tehachapi Range (southern Sierra Nevada) may now host the last martins that nest in oak woodlands, with approximately 100-200 pairs or about 15 percent of the California population. In summer of 2000, we found 57...

  20. Processing of Oak Ridge Mixed Waste Labpacks

    SciTech Connect

    Estes, C. H.; Franco, P.; Bisaria, A.

    2002-02-26

    The Oak Ridge Site Treatment Plan (STP) issued under a Tennessee Commissioner's Order includes a compliance milestone related to treatment of mixed waste labpacks on the Oak Ridge sites. The treatment plan was written and approved in Fiscal Year 1997. The plan involved approximately 1,100 labpacks and 7,400 on-the-shelf labpackable items stored at three Department of Energy (DOE) sites on the Oak Ridge Reservation (ORR). The labpacks and labpack items consist of liquids and solids with various chemical constituents and radiological concerns. The waste must be processed for shipment to a commercial hazardous waste treatment facility or treatment utilizing a Broad Spectrum mixed waste treatment contract. This paper will describe the labpack treatment plan that was developed as required by the Site Treatment Plan and the operations implemented to process the labpack waste. The paper will discuss the labpack inventory in the treatment plan, treatment and disposal options, processing strategies, project risk assessment, and current project status.

  1. 2012 Groundwater Monitoring Report Project Shoal Area Subsurface Corrective Action Unit 447

    SciTech Connect

    2013-03-01

    The Project Shoal Area (PSA) in Nevada was the site of a 12-kiloton underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. Analytical results from the 2012 monitoring are consistent with those of the previous years, with tritium detected only in well HC-4. The tritium concentration in groundwater from well HC-4 remains far below the U.S. Environmental Protection Agency-established maximum contaminant level of 20,000 picocuries per liter. Concentrations of total uranium and gross alpha were also detected during this monitoring period, with uranium accounting for nearly all the gross alpha activity. The total uranium concentrations obtained from this monitoring period were consistent with previous results and reflect a slightly elevated natural uranium concentration, consistent with the mineralized geologic terrain. Isotopic ratios of uranium also indicate a natural source of uranium in groundwater, as opposed to a nuclear-test-related source. Water level trends obtained from the 2012 water level data were consistent with those of previous years. The corrective action strategy for the PSA is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the current monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. While water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an

  2. Weldon Spring Site environmental report for calendar year 1993. Weldon Springs Site Remedial Action Project

    SciTech Connect

    Not Available

    1994-05-01

    This Site Environmental Report for Calendar Year 1993 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels, and to summarize trends and/or changes in contaminant concentrations from environmental monitoring program. In 1993, the maximum committed dose to a hypothetical individual at the chemical plant site perimeter was 0.03 mrem (0.0003 mSv). The maximum committed dose to a hypothetical individual at the boundary of the Weldon Spring Quarry was 1.9 mrem (0.019 mSv). These scenarios assume an individual walking along the perimeter of the site-once a day at the chemical plant/raffinate pits and twice a day at the quarry-250 days per year. This hypothetical individual also consumes fish, sediment, and water from lakes and other bodies of water in the area. The collective dose, based on an effected population of 112,000 was 0.12 person-rem (0.0012 person-Sv). This calculation is based on recreational use of the August A. Busch Memorial Conservation Area and the Missouri Department of Conservation recreational trail (the Katy Trail) near the quarry. These estimates are below the U.S. Department of Energy requirement of 100 mrem (I mSv) annual committed effective dose equivalent for all exposure pathways. Results from air monitoring for the National Emission Standards for Hazardous Air Pollutants (NESHAPs) program indicated that the estimated dose was 0.38 mrem, which is below the U.S. Environmental Protection Agency (EPA) standard of 10 mrem per year.

  3. 77 FR 34456 - Notice of Final Federal Agency Actions on the Newberg Dundee Bypass Project Project: Yamhill and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... Invasive Species. (Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and... claim is filed on or before December 10, 2012. If the Federal law that authorizes judicial review of a... the Tier 2 DEIS. The actions by the Federal agencies and the laws under which such actions were taken...

  4. From Idea to Action: Promoting Responsible Management Education through a Semester-Long Academic Integrity Learning Project

    ERIC Educational Resources Information Center

    Lavine, Marc H.; Roussin, Christopher J.

    2012-01-01

    The authors describe a semester-long action-learning project where undergraduate or graduate management students learn about ethics, responsibility, and organizational behavior by examining the policy of their college or university that addresses academic integrity. Working in teams, students adopt a stakeholder management approach as they make…

  5. Intervening in Early Written Literacy Development for Gifted Children in Grade 2: Insights from an Action Research Project

    ERIC Educational Resources Information Center

    Roessingh, Hetty; Bence, Michelle

    2017-01-01

    This article reports on an action research project undertaken by a team of four Grade 2 teachers who work in a school for gifted learners. Focused on implementing a structured printing and spelling curriculum in addition to providing instructed support for planning, organizing, and vocabulary use for different genres of writing, both qualitative…

  6. 77 FR 66215 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York Correction In notice document 2012-26799, appearing on page 65929 in the...

  7. Collaborative Action Research and Project Work: Promising Practices for Developing Collaborative Inquiry among Early Childhood Preservice Teachers

    ERIC Educational Resources Information Center

    Moran, Mary Jane

    2007-01-01

    Excerpts from case studies of two preservice teaching teams exemplify a new approach for merging research and practice within an introductory early childhood methods course. Through participation in cycles of collaborative action research focused on the joint task of implementing long-term projects, preservice teachers evidenced change in the ways…

  8. We Make This Road as We Walk Together: Sharing Teacher Authority in a Social Action Curriculum Project

    ERIC Educational Resources Information Center

    Schultz, Brian D.; Oyler, Celia

    2006-01-01

    This article investigates issues of teacher authority and student initiations in a classroom-based social action curriculum project. A teacher (the first author of this article) and his fifth-grade, African-American students conceptualized, designed, and carried out a seven-month-long integrated curriculum and campaign to lobby for a sorely needed…

  9. "What Happened to Our Sense of Justice?" Tracing Agency and Critical Engagement in a Youth Participatory Action Research Project

    ERIC Educational Resources Information Center

    Giraldo-García, Regina J.; Galletta, Anne

    2015-01-01

    Tracing the nature of critical engagement and agency among youth in a participatory action research (PAR) collective, the study attends to the manner in which critical engagement and agency developed over time for the youth researchers. The focus of the project was to conduct a survey among ninth grade students concerning their early high school…

  10. An Action Research Project to Determine the Utility of Bully Prevention in Positive Behavior Support for Elementary School Bullying Prevention

    ERIC Educational Resources Information Center

    Goodman-Scott, Emily; Doyle, Beth; Brott, Pamelia

    2014-01-01

    A trio of researchers presents a case study from a practical, participatory action research project to demonstrate how one school district implemented a school-wide bullying prevention initiative for all elementary schools based on Bully Prevention in Positive Behavior Support (BP-PBS). The purpose of this manuscript is to discuss the process of…

  11. An Action Research Project to Determine the Utility of Bully Prevention in Positive Behavior Support for Elementary School Bullying Prevention

    ERIC Educational Resources Information Center

    Goodman-Scott, Emily; Doyle, Beth; Brott, Pamelia

    2014-01-01

    A trio of researchers presents a case study from a practical, participatory action research project to demonstrate how one school district implemented a school-wide bullying prevention initiative for all elementary schools based on Bully Prevention in Positive Behavior Support (BP-PBS). The purpose of this manuscript is to discuss the process of…

  12. Exclusion in an Inclusive Action Research Project: Drawing on Student Perspectives of School Science to Identify Discourses of Exclusion

    ERIC Educational Resources Information Center

    Nystrom, Eva

    2007-01-01

    This article reports on the outcomes of an action research project on gender and science education carried out in two upper secondary schools in Sweden. The article focuses on how student voices draw on wider societal discourses when they talk about what it means to be natural science students at the beginning of the twenty-first century. The…

  13. 78 FR 26104 - Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Federal Highway Administration Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson County, OR AGENCY: Federal Highway Administration (FHWA), Department of..., Program Development Team Leader, Federal Highway Administration, 530 Center Street NE., Suite 420,...

  14. Making Space for Democracy through Assessment and Feedback in Higher Education: Thoughts from an Action Research Project in Education Studies

    ERIC Educational Resources Information Center

    McDonnell, Jane; Curtis, Will

    2014-01-01

    This paper reports on an action research project into the development of a "democratic feedback model" with students on an education studies programme at a post-1992 university in the UK. Building on work that has explored the dialogic dimensions of assessment and feedback, the research explored the potential for more…

  15. Collaborative Action Research as a Tool for Generating Formative Feedback on Teachers' Classroom Assessment Practice: The KREST Project

    ERIC Educational Resources Information Center

    Harrison, Christine

    2013-01-01

    This paper sets out to explore science teachers' classroom assessment practices and outlines some of the tensions and synergies in changing assessment practices. It describes episodes from a collaborative action research project with science teachers designed to support the strengthening of classroom assessment practices--the King's Researching…

  16. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    SciTech Connect

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state`s 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs.

  17. Toward Solutions: The Work of the Biology Action-Research Group. Learning in Science Project. Working Paper No. 29.

    ERIC Educational Resources Information Center

    Boe, Robyn; And Others

    Many students, even after formal science instruction, have not developed a scientifically acceptable concept of "living,""animal," or "plant." Therefore, as part of the action-research phase of the Learning in Science Project, a working group was formed to explore (with teachers) some possible strategies aimed at…

  18. Collaborative Action Research as a Tool for Generating Formative Feedback on Teachers' Classroom Assessment Practice: The KREST Project

    ERIC Educational Resources Information Center

    Harrison, Christine

    2013-01-01

    This paper sets out to explore science teachers' classroom assessment practices and outlines some of the tensions and synergies in changing assessment practices. It describes episodes from a collaborative action research project with science teachers designed to support the strengthening of classroom assessment practices--the King's Researching…

  19. A Synthesis and Application Teaching Approach for Group Projects in an Undergraduate Business Course: An Action Research Study

    ERIC Educational Resources Information Center

    Green, Laurena E.

    2009-01-01

    Scholars proposed it would be possible to enhance group effectiveness and functioning if people could develop a better appreciation of the processes surrounding group development (M. K. Smith, 2005). The action research study explored the facilitation of a synthesis and application teaching approach for group projects in the practice of two…

  20. From Idea to Action: Promoting Responsible Management Education through a Semester-Long Academic Integrity Learning Project

    ERIC Educational Resources Information Center

    Lavine, Marc H.; Roussin, Christopher J.

    2012-01-01

    The authors describe a semester-long action-learning project where undergraduate or graduate management students learn about ethics, responsibility, and organizational behavior by examining the policy of their college or university that addresses academic integrity. Working in teams, students adopt a stakeholder management approach as they make…

  1. Making Space for Democracy through Assessment and Feedback in Higher Education: Thoughts from an Action Research Project in Education Studies

    ERIC Educational Resources Information Center

    McDonnell, Jane; Curtis, Will

    2014-01-01

    This paper reports on an action research project into the development of a "democratic feedback model" with students on an education studies programme at a post-1992 university in the UK. Building on work that has explored the dialogic dimensions of assessment and feedback, the research explored the potential for more…

  2. Democratic Deliberations in the Finnish Elementary Classroom: The Dilemmas of Deliberations and the Teacher's Role in an Action Research Project

    ERIC Educational Resources Information Center

    Tammi, Tuure

    2013-01-01

    Finnish youth are found to be, despite their broad knowledge, uninterested in politics and in societal participation. As a remedy, international studies suggest enabling democratic experiences in schools. This article discusses an action research project aimed at developing deliberation-based democratic practice in an elementary classroom. Results…

  3. Fiscal Year 1998 Well Installation, Plugging and Abandonment, and Redevelopment summary report Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-12-01

    This report summarizes the well installation, plugging and abandonment, and redevelopment activities conducted during the federal fiscal year (FY) 1998 at the Y-12 Plant, Oak Ridge, Tennessee. Five new groundwater monitoring wells were installed at the Y-12 Plant under the FY 1998 drilling program. Two of the wells are located in west Bear Creek Valley, one is in the eastern Y-12 Plant area near Lake Reality, and two are located near the Oil Landfarm Waste Management Area, which were installed by Bechtel Jacobs Company LLC (Bechtel Jacobs) as part of a site characterization activity for the Oak Ridge Reservation (ORR) Disposal Cell. Also, two existing wells were upgraded and nine temporary piezometers were installed to characterize hydrogeologic conditions at the Disposal Cell site. In addition, 40 temporary piezometers were installed in the Boneyard/Bumyard area of Bear Creek Valley by Bechtel Jacobs as part of the accelerated remedial actions conducted by the Environmental Restoration Program. Ten monitoring wells at the Y-12 Plant were decommissioned in FY 1998. Two existing monitoring wells were redeveloped during FY 1998 (of these, GW-732 was redeveloped tsvice). All well installation and development (including redevelopment) was conducted following industry-standard methods and approved procedures from the Environmental Surveillance Procedures Quality Control Program (Energy Systems 1988); the Resource Conservation and Recovery Act (RCRA) Groundwater Monitoring Technical Enforcement Guidance Document (EPA 1992); and the Monitoring Well Installation Plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee (Energy Systems 1997a). Well installation and development of the non-Y-12 Plant GWPP oversight installation projects were conducted using procedures/guidance defined in the following documents: Work Plan for Support to Upper East Fork Poplar Creek East End Volatile Organic Compound Plumes Well Installation Project, Oak Ridge Y-12 Plant, Oak Ridge

  4. Radiation Protection Considerations at USACE Formerly Utilized Sites Remedial Action Program (FUSRAP) Projects

    SciTech Connect

    Brown, S.H.

    2008-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was initially authorized by Congress in 1974. FUSRAP was enacted to address residual radioactive contamination associated with numerous sites across the U.S. at which radioactive material (primarily Uranium ores and related milling products) had been processed in support of the nation's nuclear weapons program dating back to the Manhattan Project and the period immediately following World War II. In October 1997, Congress transferred the management of this program from the Department of Energy to the United States Corp of Engineers. Through this program, the Corps addresses the environmental remediation of certain sites once used by DOE's predecessor agencies, the Manhattan Engineer District and the Atomic Energy Commission. The waste at FUSRAP sites consists mainly of low levels of uranium, thorium and radium, along with some mixed wastes. Upon completion of remedial activities, these sites are transferred to DOE for long-term stewardship activities. This paper presents and contrasts the radiological conditions and recent monitoring results associated with five large ongoing FUSRAP projects including Maywood, N.J.; the Linde site near Buffalo, N.Y.; Colonie in Albany N.Y. and the St Louis, Mo. airport and downtown sites. The radiological characteristics of soil and debris at each site and respective regulatory clean up criteria is presented and contrasted. Some differences are discussed in the radiological characteristics of material at some sites that result in variations in radiation protection monitoring programs. Additionally, summary data for typical personnel radiation exposure monitoring results are presented. In summary: 1. The FUSRAP projects for which data and observations are reported in this paper are considered typical of the radiological nature of FUSRAP sites in general. 2. These sites are characterized by naturally occurring uranium and thorium series radionuclides in soil and debris, at

  5. Redesigning a Neuroscience Laboratory Course for Multiple Sections: An Action Research Project to Engage Students.

    PubMed

    Tu, Hsiao-Wei; Jones, Brett D

    2017-01-01

    The purpose of our action research project was to improve students' motivation in a multi-section introductory neuroscience laboratory course. In this paper, we present: (a) how we collected data related to students' motivation and engagement, (b) how we analyzed and used the data to make modifications to the courses, (c) the results of the course modifications, and (d) some possible explanations for our results. Our aim is not only to provide the results of our study, but also to explain the process that we used, with the hopes that other instructors can use similar approaches to improve students' motivation in their courses. Our attempts to improve students' motivation-related perceptions were successful in some instances, but not in others. Of particular note was our finding that some of the students' perceptions varied even though the course syllabus was the same across sections. We attributed this variation to the learning environment developed by the teaching assistants (TAs) who taught the different sections. We provide some strategies that faculty instructors can use to redesign courses with high enrollments and help TAs motivate their students.

  6. Enabling tomorrow's doctors to address obesity in a GP consultation: an action research project.

    PubMed

    Leedham-Green, Kathleen E; Pound, Rebecca; Wylie, Ann

    2016-11-01

    Obesity is a leading risk factor for morbidity and mortality, however, guidelines for prevention and management are relatively recently established. Little is known about what needs to be in place to put these into practice. This research provides an insight into how senior medical students consult with obese patients in general practice, the range of their learning needs, and the impact of various educational strategies that aim to bring their practice closer to current evidence-based guidelines. It centres on a series of compulsory but formative reflective case studies written by final year students at one large medical school on their GP rotation as they consult independently with obese patients with 'next room' GP tutor support. Analysis of these case studies was used to inform a three-year educational action research project. By systematically identifying and addressing learning needs, including barriers and enablers to best practice, we have demonstrated how senior medical students, and their GP tutors, can acquire the role legitimacy and role competency required for effective practice.

  7. When oak ordinances fail: unaddressed issues of oak conservation

    Treesearch

    Rudolph H. Light; Linda E. Pedroni

    2002-01-01

    The mandate by the California Board of Forestry in 1993 required each of the 41 counties which have significant oak woodlands to develop programs for the ultimate protection of this resource. As of 2001, a few counties have planned for the sustainability of their oak woodlands, but some counties may not be addressing the key components that will determine the overall...

  8. Waste management plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    SciTech Connect

    1996-04-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Plant Landfill V, and restore the affected floodplain. The waste management plan addresses management and disposition of all wastes generated during the LEFPC remedial action. Most of the solid wastes will be sanitary or construction/demolition wastes and will be disposed of at existing Y- 12 facilities. Some small amounts of hazardous waste are anticipated, along with possible low-level or mixed wastes (> 35 pCi/g). Liquid wastes will be generated which will be sanitary and capable of being disposed of at the Oak Ridge Sewage Treatment Plant, except sanitary sewage.

  9. Effects of wildfire on blue oak in the northern Sacramento Valley

    Treesearch

    Marc Horney; Richard B. Standiford; Douglas McCreary; Jerry Tecklin; Roy Richards

    2002-01-01

    The objective of this project was to develop a technique for rapidly determining the extent of wildfire damage to blue oaks (Quercus douglasii) that would be usable by landowners without requiring extensive training. In late winter 2000, 100 oaks of various sizes and degrees of damage were selected from 10 plots located where wildfires had burned in...

  10. Determining significance within CEQA: a new UC program to assist planners in conserving oak woodlands

    Treesearch

    Gregory A. Giusti; Douglas D. McCreary

    2008-01-01

    In 2004, the California State Legislature passed Senate Bill 1334 (Bill), titled Oak Woodlands Conservation: Environmental Quality. This Bill states, “A county…shall determine whether a project within its jurisdiction may result in a conversion of oak woodlands that will have a significant effect on the environment”. Once a determination has been...

  11. Searching for New Directions: Developing MA Action Research Project as a Tool for Teaching

    ERIC Educational Resources Information Center

    Lee, Young Ah; Wang, Ye

    2012-01-01

    Action research has been recognized as a useful professional development tool for teaching, but for inservice teachers, conducting action research can be challenging. Their learning about action research can be influenced by social situations--whether in an MA (Master of Arts) program or other professional development. The purpose of this…

  12. Radioisotope production and management at Oak Ridge National Laboratory

    SciTech Connect

    Collins, E.D.; Aaron, W.S.; Alexander, C.W.; Bigelow, J.E.; Parks, J.T.; Tracy, J.G.; Wham, R.M.

    1994-09-01

    The production of radioisotopes has been one of the basic activities at Oak Ridge since the end of World War II. The importance of this work was best described by Alvin Weinberg, former Laboratory Director, when he wrote ``... If God has a golden book and writes down what it is that Oak Ridge National Laboratory did that had the biggest influence on science, I would guess that was the production and distribution of isotopes.`` Radioisotopes production continues to be an important aspect of Oak Ridge programs today and of those planned for the future. Past activities, current projects, and future plans and potentials will be described briefly in this paper. Also, some of the major issues facing the continued production of radioisotopes will be described. The scope of the program has always been primarily that of process development, followed by special batch-type productions, where no other supply exists. The technology developed has been available for adoption by US commercial corporations, and in cases where this has occurred, Oak Ridge has withdrawn as a supplier of the particular isotopes involved. One method of production that will not be described is that of target bombardment with an accelerator. This method was used at Oak Ridge prior to 1978 in the 86-inch Cyclotron. However, this method has not been used at Oak Ridge since then for radioisotope production, except as a research tool.

  13. Regenerating oaks in Missouri's bottomlands

    Treesearch

    Dan Dey; John Kabrick

    2004-01-01

    Bottomland oaks are valuable timber species that are also important for wildlife, but regenerating them is about as easy as training blackbirds to plant acorns. Missouri once had an estimated 5 million acres of wetlands, much of which were bottomland forests that included some oak. Today, less than 15 percent of those historical wetlands remain in the state. Many...

  14. Oak Regeneration by Direct Seeding

    Treesearch

    Robert L. Johnson; Roger M. Krinard

    1985-01-01

    Direct sowing of oak acorns has not always met with success. This paper summarizes recent research regarding direct sowing of oaks in research plots and commercial trials. Present findings indicate that seedlings can be established from properly stored acorns sown any month of the year by hand or machine . They should be sown at a two-inch depth , although they can be...

  15. Oak Regeneration - What We Know

    Treesearch

    Harvey E. Kennedy

    1989-01-01

    Growth and development of saplings of four-oak (Quercus spp.) species planted at five spacings in a minor stream bottom in southeast Arkansas showed significant differences among species and spacings. Spacing affected all tree size and biomass variables except survival. Yater oak (Q. nigra L.) developed most rapidly; swamp chestnut...

  16. Seeding and planting upland oaks

    Treesearch

    Paul S. Johnson

    1989-01-01

    Oaks can be planted or seeded in uplands to: (1) afforest old fields, strip-mined areas, or other areas devoid of trees, and (2) supplement natural reproduction within existing forests. Planting is usually more successful than direct seeding. But even under good conditions survival and growth of planted oak has been considerably poorer than with conifers and other...

  17. Seeding and planting upland oaks

    Treesearch

    T. E. Russell

    1971-01-01

    Upland oaks can be established by seeding or planting, but additional experience is needed before these methods become economical alternatives to natural regeneration. Recently forested sites are generally more favorable than abandoned fields. Lack of repellents to protect acorns from animals severely limits direct seeding, but oaks can be planted readily by...

  18. Community based needs assessment in an urban area: a participatory action research project.

    PubMed

    Ahari, Saeid Sadeghieh; Habibzadeh, Shahram; Yousefi, Moharram; Amani, Firouz; Abdi, Reza

    2012-03-07

    Community assessment is a core function of public health. In such assessments, a commitment to community participation and empowerment is at the heart of the WHO European Healthy Cities Network, reflecting its origins in health for all and the Ottawa Charter for Health Promotion. This study employs a participation and empowerment plan in order to conduct community assessment. The method of participatory action research (PAR) was used. The study was carried out in an area of high socio-economic deprivation in Ardabil, a city in the northwest of Iran, which is currently served by a branch of the Social Development Center (SDC). The steering committee of the project was formed by some university faculty members, health officials and delegates form Farhikhteh non-governmental organization and representatives from twelve blocks or districts of the community. Then, the representatives were trained and then conducted focus groups in their block. The focus group findings informed the development of the questionnaire. About six hundred households were surveyed and study questionnaires were completed either during face-to-face interviews by the research team (in case of illiteracy) or via self-completion. The primary question for the residents was: 'what is the most important health problem in your community? Each health problem identified by the community was weighted based on the frequency it was selected on the survey, and steering committee perception of the problem's seriousness, urgency, solvability, and financial load. The main problems of the area appeared to be the asphalt problem, lack of easy access to medical centers, addiction among relatives and unemployment of youth. High participation rates of community members in the steering committee and survey suggest that the PAR approach was greatly appreciated by the community and that problems identified through this research truly reflect community opinion. Participatory action research is an effective method for

  19. Community based needs assessment in an urban area; A participatory action research project

    PubMed Central

    2012-01-01

    Background Community assessment is a core function of public health. In such assessments, a commitment to community participation and empowerment is at the heart of the WHO European Healthy Cities Network, reflecting its origins in health for all and the Ottawa Charter for Health Promotion. This study employs a participation and empowerment plan in order to conduct community assessment. Methods The method of participatory action research (PAR) was used. The study was carried out in an area of high socio-economic deprivation in Ardabil, a city in the northwest of Iran, which is currently served by a branch of the Social Development Center (SDC). The steering committee of the project was formed by some university faculty members, health officials and delegates form Farhikhteh non-governmental organization and representatives from twelve blocks or districts of the community. Then, the representatives were trained and then conducted focus groups in their block. The focus group findings informed the development of the questionnaire. About six hundred households were surveyed and study questionnaires were completed either during face-to-face interviews by the research team (in case of illiteracy) or via self-completion. The primary question for the residents was: 'what is the most important health problem in your community? Each health problem identified by the community was weighted based on the frequency it was selected on the survey, and steering committee perception of the problem's seriousness, urgency, solvability, and financial load. Results The main problems of the area appeared to be the asphalt problem, lack of easy access to medical centers, addiction among relatives and unemployment of youth. High participation rates of community members in the steering committee and survey suggest that the PAR approach was greatly appreciated by the community and that problems identified through this research truly reflect community opinion. Conclusions Participatory action

  20. Environmental Compliance and Protection Program Description Oak Ridge, Tennessee

    SciTech Connect

    Bechtel Jacobs

    2009-02-26

    The objective of the Environmental Compliance and Protection (EC and P) Program Description (PD) is to establish minimum environmental compliance requirements and natural resources protection goals for the Bechtel Jacobs Company LLC (BJC) Oak Ridge Environmental Management Cleanup Contract (EMCC) Contract Number DE-AC05-98OR22700-M198. This PD establishes the work practices necessary to ensure protection of the environment during the performance of EMCC work activities on the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee, by BJC employees and subcontractor personnel. Both BJC and subcontractor personnel are required to implement this PD. A majority of the decontamination and demolition (D and D) activities and media (e.g., soil and groundwater) remediation response actions at DOE sites on the ORR are conducted under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). CERCLA activities are governed by individual CERCLA decision documents (e.g., Record of Decision [ROD] or Action Memorandum) and according to requirements stated in the Federal Facility Agreement for the Oak Ridge Reservation (DOE 1992). Applicable or relevant and appropriate requirements (ARARs) for the selected remedy are the requirements for environmental remediation responses (e.g., removal actions and remedial actions) conducted under CERCLA.