Science.gov

Sample records for action project section

  1. Guidance: CERCLA Section 106 Judicial Actions

    EPA Pesticide Factsheets

    This guidance provides criteria for consideration in selecting and initiating Section 106 judicial actions. The guidance also identifies and discusses issues that should be considered in preparation of a Section 106 referral.

  2. Action Research Monographs. Complete Set. Pennsylvania Action Research Network, 1998-99. A Section 353 Project of the Pennsylvania Department of Education, Bureau of Adult Basic and Literacy Education. A Learning from Practice Project.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., McKeesport.

    This publication consists of the complete set of 23 monographs developed by the Pennsylvania Action Research Network to supplement the 67 monographs produced over the past 3 years. The specific audience are literacy, General Educational Development (GED), and English-as-a Second Language (ESL) practitioners. The titles are: "Use of…

  3. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... and classification of United States lands as water power sites and other actions under section 24...

  4. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... and classification of United States lands as water power sites and other actions under section 24...

  5. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... and classification of United States lands as water power sites and other actions under section 24...

  6. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... and classification of United States lands as water power sites and other actions under section 24...

  7. Action Learning: Student Community Service Projects.

    ERIC Educational Resources Information Center

    Aronstein, Laurence W.; Olsen, Edward G.

    By engaging students in community service projects, action learning uses resources of the real world to give students opportunities to participate in performing tasks and making decisions that confront societal problems. Such projects should be decided on after a study of the needs of the community. After a project is selected, all relevant…

  8. Turbine Engine Hot Section Technology (HOST) Project

    NASA Technical Reports Server (NTRS)

    Sokolowski, Daniel E.; Ensign, C. Robert

    1986-01-01

    The Hot Section Technology (HOST) Project is a NASA-sponsored endeavor to improve the durability of advanced gas turbine engines for commercial and military aircraft. Through improvements in the analytical models and life prediction systems, designs for future hot section components, the combustor and turbine, will be more accurately analyzed and will incorporate features required for longer life in the more hostile operating environment of high performance engines.

  9. A Telecommunications-Infused Community Action Project.

    ERIC Educational Resources Information Center

    March, Thomas; Puma, Jessica

    1996-01-01

    The Nonprofit Prophets, a telecommunications-infused community action project, was designed for high school students. Students were teamed with a nonprofit organization and produced videoconferences or Web sites for them. Although specific skills were acquired, students also gained confidence and self-esteem as well as a belief that they…

  10. realfriends: A Student Social Action Project

    ERIC Educational Resources Information Center

    Van Zoost, Steven

    2012-01-01

    "realfriends" is a social action project created by Grade 12 English students in Windsor, Nova Scotia. Its purpose was to create a face-to-face social network that would help change the school climate into a more social space. Interest in socializing is nothing new for teenagers, but these students articulated a worry that people their…

  11. Utah Character Education Action Research Projects.

    ERIC Educational Resources Information Center

    Utah State Office of Education, Salt Lake City.

    This booklet contains a synopsis of eight action research projects undertaken by educators from various Utah public schools presented at a series of workshops. Twenty-seven educators representing 19 schools, 9 school districts, and the Utah State Office of Education (USOE) attended the series of 4 full-day workshops held during October, February,…

  12. Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA project

    SciTech Connect

    Not Available

    1989-09-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

  13. Volatile organic compound remedial action project

    SciTech Connect

    1991-12-01

    This Environmental Assessment (EA) reviews a proposed project that is planned to reduce the levels of volatile organic compound (VOC) contaminants present in the Mound domestic water supply. The potable and industrial process water supply for Mound is presently obtained from a shallow aquifer via on-site production wells. The present levels of VOCs in the water supply drawn from the on-site wells are below the maximum contaminant levels (MCLs) permissible for drinking water under Safe Drinking Water Act (SDWA; 40 CFR 141); however, Mound has determined that remedial measures should be taken to further reduce the VOC levels. The proposed project action is the reduction of the VOC levels in the water supply using packed tower aeration (PTA). This document is intended to satisfy the requirements of the National Environmental Policy Act (NEPA) of 1969 and associated Council on Environmental Quality regulations (40 CFR parts 1500 through 1508) as implemented through U.S. Department of Energy (DOE) Order 5440.1D and supporting DOE NEPA Guidelines (52 FR 47662), as amended (54 FR 12474; 55 FR 37174), and as modified by the Secretary of Energy Notice (SEN) 15-90 and associated guidance. As required, this EA provides sufficient information on the probable environmental impacts of the proposed action and alternatives to support a DOE decision either to prepare an Environmental Impact Statement (EIS) or issue a Finding of No Significant Impact (FONSI).

  14. The Action-Project Method in Counseling Psychology

    ERIC Educational Resources Information Center

    Young, Richard A.; Valach, Ladislav; Domene, Jose F.

    2005-01-01

    The qualitative action-project method is described as an appropriate and heuristic qualitative research method for use in counseling psychology. Action theory, which addresses human intentional, goal-directed action, project, and career, provides the conceptual framework for the method. Data gathering and analysis involve multiple procedures to…

  15. Community Action Projects: Applying Biotechnology in the Real World

    ERIC Educational Resources Information Center

    Nguyen, Phuong D.; Siegel, Marcelle A.

    2015-01-01

    Project-based learning and action research are powerful pedagogies in improving science education. We implemented a semester-long course using project-based action research to help students apply biotechnology knowledge learned in the classroom to the real world. Students had several choices to make in the project: working individually or as a…

  16. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  17. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  18. An Action-Research Project: Community Lead Poisoning Prevention

    ERIC Educational Resources Information Center

    Rajaram, Shireen S.

    2007-01-01

    This action-research project focused on gathering data on awareness of lead poisoning, as well as disseminating information on lead poisoning prevention in a metropolitan midwestern city. This project reflects an action-research approach to service learning and was in collaboration with a grass-roots organization. This paper outlines the daunting…

  19. Proceedings of Management Workshop for Alcohol Safety Action Project Leaders.

    ERIC Educational Resources Information Center

    Human Resources Research Organization, Alexandria, VA.

    The workshop for Alcohol Safety Action Project administrators was held to help prepare project directors in the management of their projects and to identify their responsibilities and job tasks. It was also attended by National Highway Traffic Safety Administration (NHTSA) representatives to help in the orientation of the ASAP program. The full…

  20. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  1. Programmatic Environmental Report for remedial actions at UMTRA (Uranium Mill Tailings Remedial Action) Project vicinity properties

    SciTech Connect

    Not Available

    1985-03-01

    This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs.

  2. The James Bay Project: Reaction or Action?

    ERIC Educational Resources Information Center

    Mackwood, Gae

    1991-01-01

    Discusses the plan to restructure northern Quebec's landscape through the James Bay hydroelectric project. Suggests that the project offers opportunities to study development versus preservation, federal versus provincial powers, and the conflict between business and Native communities. Explores the need to teach students to care about social…

  3. Indigenizing Teacher Education: An Action Research Project

    ERIC Educational Resources Information Center

    Kitchen, Julian; Raynor, Marg

    2013-01-01

    This action research report focuses on a new elective course entitled "Indigenizing Education: Education for/about Aboriginal Peoples" that was developed and taught by two teacher educators--one Euro-Canadian and the other Metis. The purpose of the course was to increase understanding of Indigenous peoples and of the impact of…

  4. Participatory Evaluation with Youth Leads to Community Action Project

    ERIC Educational Resources Information Center

    Ashton, Carolyn; Arnold, Mary E.; Wells, Elissa E.

    2010-01-01

    4-H has long emphasized the importance of civic engagement and community service for positive youth development. One pathway to this ideal is youth action research and evaluation. This article demonstrates how participatory youth research and evaluation can lead to the successful implementation of community action projects. It describes the…

  5. Warroad Channel Project. Section 107. Detailed Project Report Warroad, Minnesota.

    DTIC Science & Technology

    1980-07-01

    72. Ir :dd i t ion, ,l p- ment of Voyageurs National Park is exptcted te, increase substantially tie nimber of tourists traveling through Rose;u...COMMERCIAL FISHING VOLUMES, 1955-1977 A-5 A-2 TONS OF COMMERCE AND MAJOR COMPONENT A-6 1955-1971 PROJECT AUTHOfRITY Authority for the study is provided...Bernstein, September 1976. "Impact of the Voyageurs National Park upon Roseau County," Uel Blank, University of Minnesota, February 1972. Tourism in the

  6. Project WILD--From Awareness to Action!

    ERIC Educational Resources Information Center

    Charles, Cheryl; Schafer, Rudy

    1984-01-01

    Discusses goals of Project WILD, an environmental and conservation program emphasizing wildlife. Includes instructions for using and sample of "dilemma cards" which allow students to read, discuss, make judgments, and write about hypothetical dilemmas concerning wildlife and/or natural resources. (BC)

  7. Is Action Research Necessarily Collaborative? Changing Mutuality within a Project

    ERIC Educational Resources Information Center

    Sousa, Francisco

    2016-01-01

    This article reports a study on collaboration within an action research project that was conducted by university researchers and elementary school teachers in the Azores, Portugal. More specifically, it examines how different kinds of participants worked together in different phases of the project. The notion of mutuality (i.e., the relative…

  8. The Biodiversity Community Action Project: An STS Investigation

    ERIC Educational Resources Information Center

    Aidin, Amirshokoohi; Mahsa, Kazempour

    2010-01-01

    The Biodiversity Community Action Project is a stimulating and vigorous project that allows students to gain an in-depth understanding of the interconnection between organisms and their environments as well as the connection of science to their lives and society. It addresses key content standards in the National Science Education Standards and…

  9. Management Workshop for Alcohol Safety Action Project: Instructor's Guide.

    ERIC Educational Resources Information Center

    Human Resources Research Organization, Alexandria, VA.

    The instructor's guide is part of a series designed to help project directors in the management of Alcohol Safety Action Projects (ASAP) through management workshops. Workshops will discuss certain phases of the ASAP including National Highway Traffic Safety Administration (NHTSA) organizational and supportive efforts, countermeasures,…

  10. Literacy Learning within Community Action Projects for Social Change

    ERIC Educational Resources Information Center

    Wright, Dana E.; Mahiri, Jabari

    2012-01-01

    This case study describes the literacy development of a struggling reader over a seven-month period as he engaged in a youth-led participatory action research (PAR) project. The project's goal was for youth participants to develop a proposal for productive change in their local community and present it to community stakeholders. The study focused…

  11. Project InterActions: A Multigenerational Robotic Learning Environment

    ERIC Educational Resources Information Center

    Bers, Marina U.

    2007-01-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both…

  12. Action Research Projects in Pre-Service Teacher Education

    ERIC Educational Resources Information Center

    Clayton, Courtney; Meadows, George

    2013-01-01

    Classroom-centered Action Research Projects are an integral component of the M.S. in Elementary Education Program at the University's (pseudonym) College of Education. This article provides a summary and discussion of the projects completed by students in the Science, Technology, Literacy and English Language Learner Specializations of the…

  13. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  14. Yes, I Can: Action Projects To Resolve Equity Issues in Educational Computing. A Project of ECCO, the Educational Computer Consortium of Ohio.

    ERIC Educational Resources Information Center

    Fredman, Alice, Ed.

    This book presents reports on selected "local action" projects that were developed as part of the Equity in Technology Project, which was inaugurated in 1985 by the Educational Computer Consortium of Ohio (ECCO). The book is organized into three sections, one for each of the populations targeted by the project. An introduction by Alice Fredman…

  15. Getting to social action: the Youth Empowerment Strategies (YES!) project.

    PubMed

    Wilson, Nance; Minkler, Meredith; Dasho, Stefan; Wallerstein, Nina; Martin, Anna C

    2008-10-01

    This article describes the social action component of the Youth Empowerment Strategies (YES!) project funded by the Centers for Disease Control and Prevention through its community-based prevention research (CBPR) initiative. YES! is designed to promote problem-solving skills, social action, and civic participation among underserved elementary and middle school youth. The after-school program focuses on identifying and building youths' capacities and strengths as a means of ultimately decreasing rates of alcohol, tobacco, and other drug use and other risky behaviors. The article discusses the conceptual models of risk and intervention and factors contributing to successful social action work, including group dynamics, intragroup leadership, facilitator skills, and school-community contexts. Attention is focused on how the nature of the projects themselves played a key role in determining the likelihood of experiencing success. Implications and recommendations for other youth-focused empowerment education projects are discussed, including the effective use of Photovoice in such projects.

  16. A "Projective" Test of the Golden Section Hypothesis.

    ERIC Educational Resources Information Center

    Lee, Chris; Adams-Webber, Jack

    1987-01-01

    In a projective test of the golden section hypothesis, 24 high school students rated themselves and 10 comic strip characters on basis of 12 bipolar constructs. Overall proportion of cartoon figures which subjects assigned to positive poles of constructs was very close to golden section. (Author/NB)

  17. Multilingual Affordances in a Swedish Preschool: An Action Research Project

    ERIC Educational Resources Information Center

    Ljunggren, Åsa

    2016-01-01

    This article summarizes the work and the main findings of an action research project that was conducted in an early childhood education and care setting in the city of Malmö, Sweden in the autumn of 2013 and spring 2014. Rönnerman's model (Aktionsforskning i praktiken: förskola och skola på vetenskaplig grund [Action research in practice:…

  18. Uranium Mill Tailings Remedial Action (UMTRA) Surface Project: Project plan. Revision 1

    SciTech Connect

    Not Available

    1993-08-11

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) [Public Law (PL) 95-604, 42 United States Code (USC) 7901], hereinafter referred to as the ``Act,`` authorizes the US Department of Energy (DOE) to stabilize and control surface tailings and ground water contamination. To fulfill this mission, the DOE has established two projects under the Uranium Mill Tailings Remedial Action (UMTRA) Project Office. The Ground Water Project was established in April 1991 as a major project and a separate project plan will be prepared for that portion of the mission. This project plan covers the UMTRA Surface Project, a major system acquisition (MSA).

  19. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY... Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 AGENCY: Southwestern Power Administration and Western Area Power Administration, Department of Energy. ACTION: Request for Project...

  20. Culminating Experience Action Research Projects, Volume 14, Spring 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  1. Culminating Experience Action Research Projects, Volume 7, Fall 2005

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Fritch, Sarah C., Ed.

    2007-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  2. Culminating Experience Action Research Projects, Volume 17, Fall 2010

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 5900 Culminating…

  3. The Reflective Dispositional Coaching Process: An Action Research Project

    ERIC Educational Resources Information Center

    Bell, Edwin D.; Grant, Kathy; Fisk-Moody, Patricia

    2007-01-01

    The authors implemented an action research project to help teacher education candidates to reflect upon, assess, and ultimately strengthen teacher candidate dispositions through the Reflective Dispositional Coaching Model. The teacher education faculty agreed that candidate dispositions should address four areas: (a) professionalism, (b)…

  4. Culminating Experience Action Research Projects, Volume 3, Spring 2003.

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Moyer, Peggy S., Ed.

    This document presents the course syllabus for Education 590 Culminating Experience at the University of Tennessee at Chattanooga's teacher licensure program. It also includes action research projects from spring 2003: "'To Track or Untrack...That Is the Question'" (Sarah Armes); "Providing Urban Students with the Motivation to…

  5. Culminating Experience Action Research Projects, Volume 13, Fall 2008

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  6. Play and Literacy: A Collaborative Action Research Project in Preschool

    ERIC Educational Resources Information Center

    Einarsdottir, Johanna

    2014-01-01

    The article describes a collaborative action research in a preschool in Reykjavik. The participants were two preschool teachers who collaborated with researchers at the University of Iceland. The project was set up as a professional development course for the teachers. Emphasis was placed on continuity in children's education, integration of play…

  7. Blogging across the Curriculum: An Action Research Project

    ERIC Educational Resources Information Center

    Nichols, Andrea

    2012-01-01

    "Blogging across the curriculum: Integrating blogging in the elementary classroom" is an Action Research Project that sought to explore the level of engagement in the writing process by students in grades 3, 4 & 5 while blogging across the curriculum. Blogging took place in homeroom classrooms as well as in the school's math, science and…

  8. Culminating Experience Action Research Projects, Volume 10, Spring 2007

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Deaver, Sharon R., Ed.

    2008-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  9. Project SAVE, Student Action for Valuing the Environment.

    ERIC Educational Resources Information Center

    Cripe, Julie, Ed.; Wright, Joe, Ed.

    Project SAVE (Student Action for Valuing the Environment) encourages a team approach to solving environmental problems. SAVE suggests that students initiate, create, and implement practical approaches to solving community environmental problems. Included in this publication are descriptions of 13 exemplary programs that include elementary schools,…

  10. Culminating Experience Action Research Projects, Volume 5, Spring 2004

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Bothman, Susan M., Ed

    2005-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  11. The Role of Facilitators in Project Action Learning Implementation

    ERIC Educational Resources Information Center

    Cao, Rui; Chuah, Kong Bieng; Chao, Yiu Chung; Kwong, Kar Fai; Law, Mo Yin

    2012-01-01

    Purpose: This paper addresses the importance of a more proactive role of organizational learning (OL) facilitators, learning motivation reinforcer, through a two-part longitudinal study in a case company. The first part of this study aims to investigate and analyze some unexpected challenges in the project action learning-driven (PAL) OL…

  12. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse

    PubMed Central

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus “alcohol culture.” Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one’s community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course. PMID:27385923

  13. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse.

    PubMed

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course.

  14. Final decision document for other contamination sources, interim response action, shell section 36 trenches, RMA

    SciTech Connect

    1990-04-01

    The shell section 36 trenches were used from 1952 to 1966 for land disposal of liquid and solid wastes generated from pesticide manufacture. They have been shown to be a source of soil and ground water contamination for volatile and semivolatile compounds. A dense non-aqueous phase liquid (DNAPL) is also believed to have originated from the area. The objective of the interim response action is to reduce the lateral migration of contaminants emanating from the trenches. The preferred IRA alternative consists of (1) A physical barrier encircling the trenches and (2) a soil and vegetative cover to eliminate recharge. This final decision document provides summaries of: (1). Alternatives considered (2). Significant events leading to the initiation of the IRA (3). The IRA project (4). Applicable or relevant and appropriate requirements, standards.

  15. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  16. MTR, TRA603. LONGITUDINAL SECTION SHOWS EAST/WEST SECTION AND PROJECTION OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MTR, TRA-603. LONGITUDINAL SECTION SHOWS EAST/WEST SECTION AND PROJECTION OF CANAL BEYOND EAST WALL OF BUILDING; PIPE TUNNEL, BULKHEAD LOCATIONS IN CANAL, SWING-OUT ISOLATION GATE, TUNNEL HATCH UNDER ROADWAY; SUB-PILE AND RABBIT CANAL SECTIONS; BALCONY CONTROL AND INSTRUMENT ROOMS; CATWALK, MAIN AND AUXILIARY HOISTS. AIR COMPRESSOR BUILDING (TRA-626) TO THE NORTH. BLAW-KNOX BKC-3150-3-5, 3/1950. INL INDEX NO. 531-0603-00-098-100004, REV. 7. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  17. Beyond You and Me: Stories for Collective Action and Learning? Perspectives from an Action Research Project

    ERIC Educational Resources Information Center

    Gearty, Margaret

    2015-01-01

    This paper explores the combination of storytelling and reflective action research as a means to effect change and learning within and across communities and organizations. Taking the complex challenge of "pro-environmental behaviour change" as an example, the paper reflects on the experiences of a pilot project run for the UK government…

  18. Taking Action: An Educator's Guide to Involving Students in Environmental Action Projects.

    ERIC Educational Resources Information Center

    Stoner, Darlene K.; And Others

    The goal of Project WILD, a K-12 interdisciplinary conservation and environmental education program emphasizing wildlife, is to assist learners of any age in developing awareness, knowledge, skills, and commitment resulting in informed decisions, responsible behavior, and constructive actions concerning wildlife and the environment. The purpose of…

  19. California Freshwater Shrimp Project: An Eco-Action Project with Real Life Learning.

    ERIC Educational Resources Information Center

    Rogers, Laurette H.

    The California Freshwater Shrimp Project is an example of a student-initiated, eco-action project. Students, from a fourth grade class in the Ross Valley School District in San Rafael, California, were linked to their community and environment through their work in rehabilitating habitat and educating the public. The paper gives an overview of a…

  20. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  1. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  2. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  3. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  4. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  5. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    SciTech Connect

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  6. Projects of the LIADA Teaching and Popularization Section

    NASA Astrophysics Data System (ADS)

    Bretones, P. S.; Oliveira, V. C.

    2006-08-01

    The goal of this work is to present an analysis of the projects developed by the Teaching and Popularization Section of the Liga Ibero-Americana de Astronomía (LIADA). We first present a brief outline of the LIADA and its objectives, with emphasis in the attempts to organize, conduct and stimulate the collaboration between the professional and amateur astronomers in Latin-America. The Section is based in Brazil and counts with the support of 16 coordinators from most Latin-American countries. Presently several projects are being developed as: astronomy to the schools, oppositions, conjuctions, eclipses and transits. The observational projects are communicated at the home page of the Section (http://www.iscafaculdades.com.br/liada) and aim to attract the attention of the general public, teachers and students to encourage the observation. The participants gather the astronomical data at the home page, supplemented by the aid of local coordinators and spontaneous collaborators. The strategy is to circulate important support material and open a discussion forum about each of the observed phenomena to enhance their public consideration and visibility. We have analyzed the records and present an evaluation of the projects executed jointly with other institutions and individuals, their importance for scientific education, the nomination and relationship with the coordinators, the difficulties with written reports, the need of a dynamical maintenance of the home page, the question of the language, the establishment of a useful communications network and the visibility of the LIADA activities. We conclude with a critical assessment of these activities, their strengths and weaknesses as observed by us and future projects of astronomy education.

  7. New Fission Cross Section Measurements using a Time Projection Chamber

    NASA Astrophysics Data System (ADS)

    Sadler, Michael

    2008-03-01

    A group of six universities (ACU, California Polytechnic, Colorado School of Mines, Georgia Institute of Technology, Ohio, and Oregon State) and three national laboratories (Los Alamos, Lawrence Livermore, and Idaho) have undertaken the task of building a Time Projection Chamber (TPC) to measure the fission cross sections needed for the next generation of nuclear reactors. The fission TPC concept will be presented, and why we think we can improve on 50 years of fission study.

  8. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    SciTech Connect

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department

  9. Project InterActions: A Multigenerational Robotic Learning Environment

    NASA Astrophysics Data System (ADS)

    Bers, Marina U.

    2007-12-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both parents and children about the mechanical and programming aspects involved in robotics, as well as to initiate them in a learning trajectory with and about technology. Results from this project address different ways in which parents and children learn together and provide insights into how to develop educational interventions that would educate parents, as well as children, in new domains of knowledge and skills such as robotics and new technologies.

  10. Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site

    SciTech Connect

    DOE /NV

    1998-11-01

    This Corrective Action Investigation Plan (CAIP) describes the US Department of Energy's (DOE's) continued environmental investigation of the subsurface Project Shoal Area (PSA) Corrective Action Unit (CAU) 447. The PSA is located in the Sand Springs Mountains in Churchill County, Nevada, about 48 kilometers (km) (30 miles [mi]) southeast of Fallon, Nevada. Project Shoal was part of the Vela Uniform Program which was conducted to improve the US' ability to detect, identify, and locate underground nuclear detonations. The test consisted of detonating a 12-kiloton nuclear device deep underground in granitic rock to determine whether seismic waves produced by an underground nuclear test could be differentiated from seismic waves produced by a naturally occurring earthquake. The test was a joint effort conducted by the US Atomic Energy Commission (AEC) and the US Department of Defense (DoD) in October 1963 (AEC, 1964).

  11. UMTRA Surface Project management action process document. Final report: Revision 1

    SciTech Connect

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

  12. A low complexity reweighted proportionate affine projection algorithm with memory and row action projection

    NASA Astrophysics Data System (ADS)

    Liu, Jianming; Grant, Steven L.; Benesty, Jacob

    2015-12-01

    A new reweighted proportionate affine projection algorithm (RPAPA) with memory and row action projection (MRAP) is proposed in this paper. The reweighted PAPA is derived from a family of sparseness measures, which demonstrate performance similar to mu-law and the l 0 norm PAPA but with lower computational complexity. The sparseness of the channel is taken into account to improve the performance for dispersive system identification. Meanwhile, the memory of the filter's coefficients is combined with row action projections (RAP) to significantly reduce computational complexity. Simulation results demonstrate that the proposed RPAPA MRAP algorithm outperforms both the affine projection algorithm (APA) and PAPA, and has performance similar to l 0 PAPA and mu-law PAPA, in terms of convergence speed and tracking ability. Meanwhile, the proposed RPAPA MRAP has much lower computational complexity than PAPA, mu-law PAPA, and l 0 PAPA, etc., which makes it very appealing for real-time implementation.

  13. 15 CFR 2006.0 - Submission of petitions requesting action under section 301.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... trade association, a certified union or recognized union or group of workers which is representative of... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Submission of petitions requesting action under section 301. 2006.0 Section 2006.0 Commerce and Foreign Trade Regulations Relating...

  14. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Policy statement on affirmative action (see section 13B). 60-3.17 Section 60-3.17 Public Contracts and Property Management Other... management objectives, a systematic plan based on sound organizational analysis and problem identification...

  15. Using Collaborative Action Learning Projects to Increase the Impact of Management Development

    ERIC Educational Resources Information Center

    Lyso, Ingunn Hybertsen; Mjoen, Kristian; Levin, Morten

    2011-01-01

    This article aims to contribute to the field of human resource development by exploring the conditions that influence the organizational impact of action learning projects. Many organizations use such projects as an integral part of their management development programs. Past research on action learning projects has shown how balancing action and…

  16. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1A: Citations with abstracts, sections 1 through 9

    SciTech Connect

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  17. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    SciTech Connect

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  18. 75 FR 76728 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-09

    ... AGENCY Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and... (EPA). ACTION: Notice. SUMMARY: EPA is hereby granting a waiver of the Buy American requirements of... of the Office of Administration and Resources Management has concurred on this decision to make...

  19. 75 FR 71127 - Notice of a Project Waiver of Section 1605 (Buy American Rquirement) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... produced in the United States of a satisfactory quality] to the UDWQ for the purchase of coconut fiber... product must apply for a separate waiver based on project-specific circumstances. These coconut fiber... exception to Section 1605 of ARRA. This action permits the purchase of coconut fiber woven mats for the...

  20. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Light Rail Project in... meaning of 23 U.S.C. 139(l)(1). The actions relate to the East Link Light Rail Transit Project in King... approvals for the following project in the State of Washington: East Link Light Rail Transit Project,...

  1. Public opinion and communicative action around renewable energy projects

    NASA Astrophysics Data System (ADS)

    Fast, Stewart

    This thesis investigates how rural communities negotiate the development of renewable energy projects. Public and local community acceptance of these new technologies in rural areas around the world is uncertain and spatially uneven and represents an area of emerging public policy interest and one where scholarly theory is rapidly developing. This thesis uses Habermasian concepts of public sphere, communicative action and deliberative democracy, as well as the concept of "wicked problems" from the planning studies literature combined with geographical concepts of place and scale to advance theoretical and empirical understanding of how public opinion on renewable energy technologies is formed in place. It documents energy use patterns, attitudes and socio-political relations at a time when considerable state and business efforts are directed at the construction of solar, wind, biomass and small-hydro technologies in rural regions. These concepts and theories are applied in a case study of rural communities in the Eastern Ontario Highlands, an impoverished area undergoing rapid restructuring driven by centralization of services and amenity migration but with abundant natural resources in form of forests, numerous waterways and open space which have attracted a broad range of new energy developments. Overall high levels of support for alternative energy development particularly for solar power were found, albeit for reasons of local energy security and not for reasons of preventing climate change. There was some evidence that seasonal residents are less supportive of hydro and biomass projects than permanent residents possibly reflecting broader trends in rural economies away from productive uses of land to consumptive appreciation of rural landscapes. The thesis suggests that collective action to advance energy projects in the case study area require agreement along three world-claims (truth, rightness and truthfulness) and that communication leading to discourse

  2. UMTRA Ground Water Project management action process document

    SciTech Connect

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards.

  3. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  4. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan. Revised

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  5. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  6. Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2008-01-01

    This report presents the 2007 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. Requirements for CAU 447, as specified in the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense (DOD), and the State of Nevada, includes groundwater monitoring in support of site closure. This is the first groundwater monitoring report prepared by DOE-LM for the PSA.

  7. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitations on Claims for.... 139(l)(1). The actions relate to the proposed Route 79/I-195 Interchange Project in Fall...

  8. 40 CFR 49.11 - Actions under section 301(d)(4) authority.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Tribal Authority § 49.11 Actions under section 301(d)(4... unreasonable delay such Federal implementation plan provisions as are necessary or appropriate to protect air... cost of implementing programs for the prevention and control of air pollution or implementation...

  9. Res Judicata and Section 1983: The Effect of State Court Judgments on Federal Civil Rights Actions.

    ERIC Educational Resources Information Center

    Levenson, Laurie L.

    1979-01-01

    Argues for a consistent approach to determining when Section 1983 litigation may follow state proceedings. Provides guidelines similar to those applied in habeas corpus proceedings for deciding when federal action will be barred. Available from UCLA Law Review, 405 Hilgard Ave., Los Angeles, CA 90024. (IRT)

  10. 77 FR 68790 - Program Comment Issued for Streamlining Section 106 Review for Actions Affecting Post-1945...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... Concrete and Steel Bridges AGENCY: Advisory Council on Historic Preservation. ACTION: Program Comment issued for streamlining Section 106 review for undertakings affecting post-1945 concrete and steel... consider the effects of undertakings on common bridges and culverts constructed of concrete or steel...

  11. Counselling and knowledge about contraceptive mode of action among married women; a cross-sectional study

    PubMed Central

    Topsever, Pınar; Filiz, Müge; Aladağ, Nihal; Topallı, Ruşen; Ciğerli, Özlem; Görpelioğlu, Süleyman

    2006-01-01

    Background Family planning counselling which covers knowledge transfer about contraceptive mode of action, by enabling informed choice, improves compliance to and efficiency of contraceptive methods. The objective of this study was to investigate associations between family planning counselling, counsellor and correct knowledge about mode of action of modern contraceptive methods among married women. Methods For this cross-sectional study, stratified (according to current modern contraceptive method in use) random sampling was performed from the registries of two primary health care centres. Main outcomes were; prevalence of family planning counselling, professional background of the counsellor and correct knowledge about mode of action. A semi-structured questionnaire developed by the researchers was applied via face-to-face interview. The answers about mode of action were categorized as correct vs. incorrect by consensus rating. Results Prevalence of counselling and correct knowledge about mode of action was 49.0% and 39.3%, respectively. Higher educated women were significantly more likely to know the mode of action (p < 0.001). Being counselled by a physician (54.1%, n = 120) was not associated with correct knowledge about mode of action (p = 0.79). Non-barrier method users were less educated (p = 0.001), more often counselled (60.8% vs. 8.0%) and less knowledgeable (p < 0.001) about mode of action of their contraceptive method, compared to condom users. Nevertheless, counselled non-barrier method users were significantly more likely to know the correct mode of action of their chosen method (p = 0.021) than counselled condom users. Conclusion The beneficial effect of counselling on knowledge about mode of action of the more complicated, medical (non-barrier) contraceptive methods suggests that the use of family planning counselling services in primary health care should be promoted; furthermore, counselling strategies and content should be re-structured for

  12. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    SciTech Connect

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

  13. Radiological survey activities: uranium mill tailings remedial action project procedures manual

    SciTech Connect

    Little, C.A.; Berven, B.A.; Carter, T.E.; Espegren, M.L.; O'Donnell, F.R.; Ramos, S.J.; Retolaza, C.D.; Rood, A.S.; Santos, F.A.; Witt, D.A.

    1986-07-01

    The US Department of Energy (DOE) was assigned the responsibility for conducting remedial action at 24 sites, which are located in one eastern and nine western states. The DOE's responsibilities are being met through its Uranium Mill Tailings Remedial Action Project Office (UMTRA-PO) in Albuquerque, New Mexico. The purpose of this Procedures Manual is to provide a standardized set of procedures that document in an auditable manner the activities performed by the Radiological Survey Activities (RASA) group in the Dosimetry and Biophysical Transport Section (DABTS) of the Health and Safety Research Division (HASRD) at the Oak Ridge National Laboratory (ORNL), in its role as the Inclusion Survey Contractor (ISC). Members of the RASA group assigned to the UMTRA Project are headquartered in the ORNL/RASA office in Grand Junction, Colorado, and report to the ORNL/RASA Project Manager. The Procedures Manual ensures that the organizational, administrative, and technical activities of the RASA/UMTRA group conform properly to those of the ISC as described in the Vicinity Properties Management and Implementation Manual and the Summary Protocol. This manual also ensures that the techniques and procedures used by the RASA/UMTRA group and contractor personnel meet the requirements of applicable governmental, scientific, and industrial standards.

  14. Project Aprendizaje, 1988-89. Evaluation Section Report. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Velasquez, Clara

    In it's first year, Project Aprendizaje served 250 students from the Dominican Republic and Puerto Rico at Seward Park High School in Manhattan (New York). Project objectives were to improve participants' language skills in Spanish and English, help participants successfully complete content area courses needed for graduation, and provide career…

  15. Project HEED, Title III, Section 306. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hughes, Orval D.

    Project HEED (Heed Ethnic Educational Depolarization) involves over 1,000 Indian children in grades 1-8 in Arizona. The project target sites are 48 classrooms at Sells, Topowa, San Carlos, Many Farms, Hotevilla, Peach Springs, and Sacaton. Objectives are to increase: (1) reading achievement, (2) affective behavior of teachers, (3) motivation by…

  16. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  17. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  18. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  19. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  20. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  1. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... finance Section 8 projects. 811.110 Section 811.110 Housing and Urban Development Regulations Relating to... RELATED AMENDMENTS § 811.110 Refunding of obligations issued to finance Section 8 projects. (a) This... assistance where applicable, CUSIP number information, and a final statement of Sources and Uses. (d)(1)...

  2. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... finance Section 8 projects. 811.110 Section 811.110 Housing and Urban Development REGULATIONS RELATING TO... RELATED AMENDMENTS § 811.110 Refunding of obligations issued to finance Section 8 projects. (a) This... refunding which generate the McKinney Act savings and, if necessary, HUD will finance in refunding bond...

  3. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... finance Section 8 projects. 811.110 Section 811.110 Housing and Urban Development REGULATIONS RELATING TO... RELATED AMENDMENTS § 811.110 Refunding of obligations issued to finance Section 8 projects. (a) This... refunding which generate the McKinney Act savings and, if necessary, HUD will finance in refunding bond...

  4. Moving beyond Consultation and into Action with a Client Project

    ERIC Educational Resources Information Center

    Ewing, Sara; Dover, Howard F.

    2012-01-01

    Attempting to implement client-based projects within a single semester often overwhelms students and underwhelms the client and grading professor. In this paper, we share results from a two-year pilot project in which the components of a client project were split between several classes. We discuss the client project model as a valuable teaching…

  5. Reshaping Literacy in a High Poverty Early Childhood Classroom: One Teacher's Action Research Project

    ERIC Educational Resources Information Center

    Rose, Lynnette; Vaughn, Margaret; Taylor, Linda

    2015-01-01

    This research explores an action research project conducted by the first author focused on supporting her preschool students' literacy and language development. Using observations, interviews, artifacts, and assessment, this research documents the first author's process of conducting an action research project over the course of one year to…

  6. 78 FR 45997 - Notice of Final Federal Agency Actions on Transportation Project in Washington State

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Transportation Project in... Project, located in the City of Puyallup (Milepost 6.40) in Pierce County, Washington. The action by FHWA... traffic, which will accommodate the future SR 167 Extension interchange and removes the existing...

  7. 76 FR 33309 - Guidance for Industry on Citizen Petitions and Petitions for Stay of Action Subject to Section...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... Stay of Action Subject to Section 505(q) of the Federal Food, Drug, and Cosmetic Act; Availability... and Petitions for Stay of Action Subject to Section 505(q) of the Federal Food, Drug, and Cosmetic Act..., and Cosmetic Act (the FD&C Act) addressing the Agency's treatment of certain citizen petitions...

  8. Action Research on Change in Schools: A Collaborative Project.

    ERIC Educational Resources Information Center

    Smulyan, Lisa

    Action research, a term first used in the 1940's by Kurt Lewin, implies the application of tools and methods of social science to immediate, practical problems, with the goals of contributing to theory and knowledge in the field of education and improving practice in the schools. Collaborative action research suggests that each group represented…

  9. Alternatives assessment other contamination sources, interim response action, shell section 36 trenches, RMA. Final report

    SciTech Connect

    1990-01-01

    This document describes the process and results of the alternatives assessment conducted for the Shell Section 36 trenches (site 36-3), approximately 31 trenches used from 1952 to 1966 for land disposal of liquid and solid wastes generated from pesticide manufacture. They have been shown to be a source of ground water contamination. A dense non-aqueous phase liquid (DNAPL) is also believed to have originated from the trenches. The assessment includes the following: (1) site characteristics. (2) discussion of alternative strategies and technologies, (3) evaluation of alternatives, and (4) conclusions. The preferred interim response action consists of a physical barrier encircling the trenches and a soil and vegetative cover.

  10. Developing Capacity for Social and Emotional Growth: An Action Research Project

    ERIC Educational Resources Information Center

    Doveston, Mary

    2007-01-01

    This article reports an action research project in which children, their teacher and the author, and an advisory teacher from a Local Authority collaborated as co-researchers in a project to improve working relationships in the classroom. Both appreciative enquiry and emancipatory research informed the project. This article focuses on one aspect…

  11. 76 FR 77301 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... Todd Drive in Dane County, Wisconsin. Those actions grant approvals for the project. The project will... Nesbitt Road to Commerce Park Drive. Stage 2 is currently scheduled for construction from approximately.../14 (Beltline) Whitney Way to Todd Drive, Dane County, Wisconsin, Project ID 1206-07-03. The...

  12. 76 FR 65776 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ...). The actions relate to a proposed highway project, US 41 (Memorial Drive to County M) in Brown County... from Memorial Drive to County M, The project will also reconstruct I-43 from US 41 to Atkinson Drive...-43 via US 41. The project limits on US 41 extend from Memorial Drive to County M, a distance...

  13. Multiple Intelligences Theory, Action Research, and Teacher Professional Development: The Irish MI Project

    ERIC Educational Resources Information Center

    Hanafin, Joan

    2014-01-01

    This paper presents findings from an action research project that investigated the application of Multiple Intelligences (MI) theory in classrooms and schools. It shows how MI theory was used in the project as a basis for suggestions to generate classroom practices; how participating teachers evaluated the project; and how teachers responded to…

  14. Lights! Camera! Action!: video projects in the classroom.

    PubMed

    Epstein, Carol Diane; Hovancsek, Marcella T; Dolan, Pamela L; Durner, Erin; La Rocco, Nicole; Preiszig, Patricia; Winnen, Caitlin

    2003-12-01

    We report on two classroom video projects intended to promote active student involvement in their classroom experience during a year-long medical-surgical nursing course. We implemented two types of projects, Nursing Grand Rounds and FPBTV. The projects are templates that can be applied to any nursing specialty and can be implemented without the use of video technology. During the course of several years, both projects have proven effective in encouraging students to promote pattern recognition of characteristic features of common illnesses, to develop teamwork strategies, and to practice their presentation skills in a safe environment among their peers. The projects appealed to students because they increased retention of information and immersed students in the experience of becoming experts about an illness or a family of medications. These projects have enabled students to become engaged and invested in their own learning in the classroom.

  15. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  16. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... this chapter; (15) Electric rate filings submitted by public utilities under sections 205 and 206 of... transportation and sale of natural gas under sections 4 and 5 of the Natural Gas Act and sections 311 and 401... under Parts 340 and 341 of this chapter; (27) Sale, exchange, and transportation of natural gas...

  17. Fusion Cross Sections of Astrophysics Interest Within the STELLA Project

    NASA Astrophysics Data System (ADS)

    Courtin, Sandrine; Fruet, Guillaume; Jenkins, David G.; Heine, Marcel; Montanari, Daniele; Morris, Luke G.; Lotay, Gavin; Regan, Patrick H.; Kirsebom, Oliver S.; Della Negra, Serge; Hammache, Faïrouz; de Sereville, Nicolas; Bastin, Beyhan; de Oliveira, François; Randisi, Giacomo; Stodel, Christelle; Beck, Christian; Haas, Florent

    Low energy fusion between light heavy-ions is a key feature of the evolution of massive stars. In systems of astrophysical interest, the process may be strongly affected by molecular configurations of the compound nucleus, leading to resonant S factors. In particular, the 12C+12C fusion reaction has been the object of numerous experimental investigations. The STELLA project has been developed to extend these investigations to lower energies towards the Gamow window.

  18. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Small flood control project..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Flood Control Policy § 263.23 Small flood control project authority (Section 205). (a) Legislative authority. Section 205 of the...

  19. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Small flood control project..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Flood Control Policy § 263.23 Small flood control project authority (Section 205). (a) Legislative authority. Section 205 of the...

  20. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Small flood control project..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Flood Control Policy § 263.23 Small flood control project authority (Section 205). (a) Legislative authority. Section 205 of the...

  1. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Small flood control project..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Flood Control Policy § 263.23 Small flood control project authority (Section 205). (a) Legislative authority. Section 205 of the...

  2. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Small flood control project..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Flood Control Policy § 263.23 Small flood control project authority (Section 205). (a) Legislative authority. Section 205 of the...

  3. Distance Education in Action: The Wisconsin Rural Reading Improvement Project.

    ERIC Educational Resources Information Center

    Wilsman, Margaret J.

    The Wisconsin Rural Reading Improvement Project implements a research-based telecommunications model of professional development and school improvement that rural school districts can use when redesigning K-12 reading curriculum. The project's approach to staff development assumes that change in school reading programs proceeds via extensive…

  4. Community Service Projects: Citizenship in Action. Fastback 231.

    ERIC Educational Resources Information Center

    Lipka, Richard P.; And Others

    This booklet examines the theory and practice of projects that involve secondary students in community services. Through such involvement, young people will develop positive attitudes toward community participation that will persist throughout their adult lives. Community service projects represent an important and exciting way to bring democracy…

  5. Climatic Action Plan Project for the state of Veracruz (Mexico)

    NASA Astrophysics Data System (ADS)

    Tejeda, A.; Ochoa, C.

    2007-05-01

    With financing of the British Government and support of the National Institute of Ecology, from April of 2006 to March of 2008 an action plan which intends variability effects and climatic change for the state of Veracruz will be made. This plan will be taken to the state government and will be spread out to manufacturers, industrialists and population. Throughout the Gulf of Mexico, the state of Veracruz is a 745 km coast in length with a width that goes from 156 km in the center to 47 km in the north. The state has large mountains, forests, plains, rivers, cascades, lagoons and coasts. Veracruz is the 10th largest state in Mexico with a 72,420 km2 surface, it is located between 17°00' and 22°28' north latitude and between 93°95' and 98°38' west longitude. Because of the orographic effect, the Sierra Madre Oriental causes the existence of many types of climate, from dry to tropical forest, going through snow on the top of the Pico de Orizaba (5747m of altitude). The wind affects the coasts by not allowing to fish during a hundred days a year (particularly in winter), and on summer tropical waves and occasionally hurricanes affect rivers causing overflow and urban floods in fields. These phenomena do not have a regular affectation; they are subject to climate variability effects. Veracruz is the third state with most population in the country (7.1 million people in 2005), only surpassed by the state of Mexico and Mexico City. Although it occupies 3.7% of the national territory, Veracruz has 6.9% of human population in the country, and is the 6th state of PIB national contribution (240 thousands of millions pesos approximately). Of the possible effects of the climatic change the following can be expected: , , : Most of the coasts of the Gulf of Mexico, low and sandy, less of a meter on the sea level, represent the most vulnerable territory of Veracruz. Towns will be affected, the saline water will infiltrate until the phreatic mantles and the coast electrical

  6. The first tunnel section of the Superconducting Super Collider project

    SciTech Connect

    Lundin, T.K.; Laughton, C.; Nelson, P.P.

    1990-11-01

    The Superconducting Super Collider (SSC) project will be constructed for the United States Department of Energy at a competitively-selected site in Ellis County, Texas, about 30 mile (50 km) south of the central business district of Dallas. The injector system and main collider ring will be housed in 70 mile (110 km) of tunnel, and the project will include additional shafts and underground enclosures with clear spans up to 30 ft (10 m) at depths of more than 250 ft (75 m). The first tunnel segment to be designed and constructed will include approximately 5.9 mile (9.4 km) of 12 ft (3.7 m) finished internal diameter tunnel, four shafts up to 55 ft (16.8 m) diameter, and various connecting tunnels and adits. Construction will be in weak rock lithologies, including mudstones, marls, and chalks with compressive strengths typically between 300 and 2500 psi (2.0 and 17.2 MPa). Design is underway, with an expected bid date before the end of 1990, and with start of construction following in the spring of 1991. 7 refs., 8 figs., 1 tab.

  7. Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)

    2001-01-01

    This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

  8. Corrective action investigation plan for Project Shoal Area CAU No. 416

    SciTech Connect

    1996-08-01

    This Corrective Action Investigation Plan (CAIP) is part of an ongoing US Department of Energy (DOE)-funded project for the investigation of Corrective Action Unit (CAU) No. 416, Project Shoal Area (PSA). Project Shoal was conducted to determine whether seismic waves produced by underground nuclear testing could be differentiated from naturally occurring earthquakes. The PSA site is located approximately 30 miles southeast of Fallon, Nevada, in the northern portion of Sand Springs Mountains in Churchill County. This CAIP will be implemented in accordance with the Federal Facility Agreement and Consent Order, the Industrial Sites Quality Assurance Project Plan, and all applicable Nevada Division of Environmental Protection policies and regulations.

  9. Commonwealth of Pennsylvania Adult Education Section 353 Special Demonstration Projects. Project Abstracts for the Fiscal Year 1997-1998.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Education, Harrisburg. Bureau of Adult Basic and Literacy Education.

    This document contains project abstracts for 29 adult basic and literacy education (ABLE) demonstration programs that were conducted in Pennsylvania in 1997-1998 through grants funded under Section 353 of the Adult Education Act. Each abstract includes the following: project name, number, purpose, impact, outcomes, conclusions/recommendations,…

  10. The calculation of radial dose from heavy ions: predictions of biological action cross sections

    NASA Technical Reports Server (NTRS)

    Katz, R.; Cucinotta, F. A.; Zhang, C. X.; Wilson, J. W. (Principal Investigator)

    1996-01-01

    The track structure model of heavy ion cross sections was developed by Katz and co-workers in the 1960s. In this model the action cross section is evaluated by mapping the dose-response of a detector to gamma rays (modeled from biological target theory) onto the radial dose distribution from delta rays about the path of the ion. This is taken to yield the radial distribution of probability for a "hit" (an interaction leading to an observable end-point). Radial integration of the probability yields the cross section. When different response from ions of different Z having the same stopping power is observed this model may be indicated. Since the 1960s there have been several developments in the computation of the radial dose distribution, in the measurement of these distributions, and in new radiobiological data against which to test the model. The earliest model, by Butts and Katz made use of simplified delta ray distribution functions, of simplified electron range-energy relations, and neglected angular distributions. Nevertheless it made possible the calculation of cross sections for the inactivation of enzymes and viruses, and allowed extension to tracks in nuclear emulsions and other detectors and to biological cells. It set the pattern for models of observable effects in the matter through which the ion passed. Here we outline subsequent calculations of radial dose which make use of improved knowledge of the electron emission spectrum, the electron range-energy relation, the angular distribution, and some considerations of molecular excitation, of particular interest both close to the path of the ion and the outer limits of electron penetration. These are applied to the modeling of action cross sections for the inactivation of several strains of E-coli and B. subtilis spores where extensive measurements in the "thin-down" region have been made with heavy ion beams. Such calculations serve to test the radial dose calculations at the outer limit of electron

  11. Scoping session of the programmatic environmental impact statement for the uranium mill tailings remedial action project

    SciTech Connect

    Not Available

    1992-12-08

    This report contains documentation of the scoping session of the environmental impact statement for the Uranium Mill Tailings Remedial Action Project. The purpose of the meeting was to talk about the Programmatic Environmental Impact Statement on the groundwater.

  12. Report: Assessment of EPA’s Projected Pollutant Reductions Resulting from Enforcement Actions and Settlements

    EPA Pesticide Factsheets

    Report #2007-B-00002, July 24, 2007. The accuracy and reliability of EPA’s projected pollutant reductions for Fiscal Years 2003-2006 were dependent on the specific program in which the enforcement action took place.

  13. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    SciTech Connect

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  14. Action Research Projects in Distance Education: A Manual.

    ERIC Educational Resources Information Center

    Ramakrishna, C. Pushpa; Prasad, V. S.

    This manual, prepared by the Distance Education Council (India) presents guidelines for action research in distance education, balancing practical research activities with a sound theoretical research base. Chapter 1, "Scope, Purpose and Design of the Manual," suggests several definitions of research; draws distinctions between academic…

  15. Children's Ideas about Animal Adaptations: An Action Research Project

    ERIC Educational Resources Information Center

    Endreny, Anna Henderson

    2006-01-01

    In this paper, I describe the action research I conducted in my third-grade science classrooms over the course of two years. In order to gain an understanding of my third-grade students' ideas about animal adaptations and how the teaching of a unit on crayfish influenced these ideas, I used clinical interviews, observations, and written…

  16. Teacher-Student Negotiation in an Action Research Project

    ERIC Educational Resources Information Center

    Tsafos, Vassilis

    2009-01-01

    Students in Greece are required to study classical texts, a task often challenging both for them and for their teachers. In this article, a teacher action researcher describes how he explored ways to enhance student engagement in the required reading. By negotiating the task of indexing, a process where students go through the text collecting…

  17. Enhancing Students' Creative Writing Skills: An Action Research Project

    ERIC Educational Resources Information Center

    Nasir, Laraib; Naqvi, Syeda Meenoo; Bhamani, Shelina

    2013-01-01

    This research aimed to improve written expression (composition) skills of 5th grade students of an elite private school. The research was designed under the paradigm of action research. A total sample of 39 students' from the same grade was chosen for the study. The baseline assessment was carried out to explore the pre-intervention writing skill…

  18. Using Action Research Projects to Examine Teacher Technology Integration Practices

    ERIC Educational Resources Information Center

    Dawson, Kara

    2012-01-01

    This study examined the technology integration practices of teachers involved in a statewide initiative via one cycle of action research. It differs from other studies of teacher technology integration practices because it simultaneously involved and provided direct benefits to teachers and researchers. The study used thematic analysis to provide…

  19. Civil Rights--State Action Is a Requirement for the Application of Section 1985 (3) to First Amendment Rights

    ERIC Educational Resources Information Center

    Malpass, Susan C.

    1976-01-01

    In Bellamy v. Masons's Stores, Inc., the Fourth Circuit of Appeals held that section 1985 (3) of the Ku Klux Klan Act displayed a congressional intent that state action be required for an action based on a conspiracy to deprive first amendment rights. The decision is examined in regard to Griffin v. Breckenridge. For journal availability see HE…

  20. 75 FR 43160 - Clean Water Act Section 303(d): Final Agency Action on One Arkansas Total Maximum Daily Load (TMDL)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Clean Water Act Section 303(d): Final Agency Action on One Arkansas Total Maximum Daily Load (TMDL) AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This...

  1. The Constant Cycle: Day to Day Critical Action of the QUIPPED Project

    ERIC Educational Resources Information Center

    Medves, Jennifer M.; Paterson, Margo; Schroder, Cori; Verma, Sarita; Broers, Teresa; Chapman, Christine; O'Riordan, Anne

    2008-01-01

    Action research in the critical paradigm involves a process of continual refection in and on action including the research process itself. In the second in a series of several papers we report on the day-to-day management of the QUIPPED project. The aim was to facilitate patient centred care through inter-professional collaboration with health…

  2. Critical Literacy Practices, Social Action Projects, and the Reader Who Struggles in School

    ERIC Educational Resources Information Center

    Bauer, Courtney Marie

    2011-01-01

    This study, conducted at an urban public school, explored the engagements of five, fourth grade, African American students who struggled with reading in school as they participated in critical literacy practices and social action projects with the assumption that critical analysis of written texts and concrete social actions were necessary for…

  3. Blended Learning and Teaching Writing: A Teacher Action Research Project

    ERIC Educational Resources Information Center

    Camahalan, Faye Marsha G.; Ruley, Andrea G.

    2014-01-01

    This teacher research project focused on utilizing blended learning to teach writing to middle school students. The intervention was designed to fit into individual lessons needed to improve students' writing skills with the main focus on sentence structure. Sixteen (16) 7th grade students were assessed with a writing sample applying the new…

  4. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    SciTech Connect

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

  5. Actionable Data Projects: Social Science and Service-Learning in General Education Courses

    ERIC Educational Resources Information Center

    Maloyed, Christie L.

    2016-01-01

    The use of service-learning pedagogies in general education courses is often limited to increasing volunteerism or civic literacy with problem-based or research-based projects reserved for upper level courses. This article examines the implementation of an "actionable data" service-learning project in an introductory, general studies…

  6. Library Spaces for Urban, Diverse Commuter Students: A Participatory Action Research Project

    ERIC Educational Resources Information Center

    Brown-Sica, Margaret S.

    2012-01-01

    A data-gathering project using elements of Participatory Action Research was conducted at the Auraria Library, which serves the University of Colorado Denver, the Metropolitan State College of Denver and the Community College of Denver. The project was administered in order to shape a plan to develop a Learning Commons environment at the library.…

  7. Taking Action: An Educator's Guide to Involving Students in Environmental Projects

    ERIC Educational Resources Information Center

    Council for Environmental Education, 2012

    2012-01-01

    Developed in cooperation with the World Wildlife Fund, "Taking Action" inspires ideas and provides models for conducting effective environmental projects--projects that dynamically engage students from start to finish. From adopting species to protecting habitats to saving energy and creating publications, this guide will help educators plan,…

  8. The Charlotte Action Research Project: A Model for Direct and Mutually Beneficial Community-University Engagement

    ERIC Educational Resources Information Center

    Morrell, Elizabeth; Sorensen, Janni; Howarth, Joe

    2015-01-01

    This article describes the evolution of the Charlotte Action Research Project (CHARP), a community-university partnership founded in 2008 at the University of North Carolina at Charlotte, and focuses particularly on the program's unique organizational structure. Research findings of a project evaluation suggest that the CHARP model's unique…

  9. Implementing an Action Research Project: A Case Study in Making Decisions and Managing Challenges

    ERIC Educational Resources Information Center

    Greenbank, Paul

    2013-01-01

    This paper examines the challenges involved in implementing an action research project. It discusses a project which uses a series of interventions (unfreezing techniques, cases studies in conjunction with analogical encoding and lecturer input) to encourage students to critically reflect on their approach to career decision-making. This paper…

  10. With Hindsight: An Overview of the Autism Spectrum Disorder Participatory Action Research Project

    ERIC Educational Resources Information Center

    Curzon, Joanna

    2008-01-01

    Much has happened since nine teams across New Zealand engaged in a Ministry of Education-funded participatory action research project looking at effective practice for supporting children and young people with autism spectrum disorder (ASD) in education. Building on earlier discussions, the project ran from 2002 to 2004, and until now the story…

  11. Enhancing the Undergraduate Student Experience via Fund-Raising Partnerships: An Action Research Project

    ERIC Educational Resources Information Center

    Thorley, Wendy; Marjoribanks, Bruce; Kranz, Julian

    2014-01-01

    This project was developed from practitioner action research and considers the impact of integrating fund-raising activities into the formal curriculum with a target group of undergraduate students. The main aim of this project was to evaluate the impact of developing fund-raising activities as an integral aspect at both module and programme…

  12. 77 FR 75254 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... actions relate to a proposed highway and transit project within the Tier 2 Elgin O'Hare--West Bypass project corridor, which is located along the Elgin-O'Hare Expressway/Thorndale ] Avenue between Chicago O'Hare International Airport (O'Hare) and Lake Street/US Route 20, and on a proposed alignment...

  13. Full Circle: Stakeholders' Evaluation of a Collaborative Enquiry Action Research Literacy Project

    ERIC Educational Resources Information Center

    Forey, Gail; Firkins, Arthur S.; Sengupta, Sima

    2012-01-01

    This paper reports on school-university collaboration during an action research project, which aimed to build a writing pedagogy for students with Learning Disabilities in the trilingual, biliterate educational context of Hong Kong. The project was established through interpersonal relationships built from the ground up between stakeholders from a…

  14. Sunset dates of chemicals subject to final TSCA section 4: test requirements and related section 12(b) actions

    EPA Pesticide Factsheets

    This table lists all chemical substances and mixtures that are and/or have been the subject of final TSCA Section 4 test rules and/or TSCA Section 4 enforceable consent agreements/orders (ECAs) issued under the TSCA Existing Chemicals Testing Program.

  15. Alvarado Flood Risk Management Modifications to Existing Project Section 408 Review. Review Plan

    DTIC Science & Technology

    2012-12-26

    39181-CJBO MEMORANDUM FOR Commander, St. Paul District SUBJECT: Review Plan Approval for the Alvarado , Minnesota, Flood Risk Management...Modifications to Existing Project, Section 408 1. References: a. Memorandum, CEMVP-EC, 3 August 2012, subject: Review Plan for Alvarado Flood Risk... Alvarado , MN, Flood Risk f\\1anagement Modi£ ications to Existing Project, Section 4 0 8 Review Plan (encl 2) . c. EC 1165-2-214, 15 December 2012, subject

  16. 78 FR 67182 - Announcement of Funding Awards for the Section 811 Project Rental Assistance Demonstration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ...In accordance with section 102 (a)(4)(C) of the Department of Housing and Urban Development Reform Act of 1989, this announcement notifies the public of funding decisions made by the Department in a competition for funding under the Notice of Funding Availability (NOFA) for the Section 811 Project Rental Assistance Demonstration Program. This announcement contains the names of the awardees and......

  17. 31 CFR 800.601 - Finality of actions under section 721.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (Continued) OFFICE OF INVESTMENT SECURITY, DEPARTMENT OF THE TREASURY REGULATIONS PERTAINING TO MERGERS, ACQUISITIONS, AND TAKEOVERS BY FOREIGN PERSONS Finality of Action § 800.601 Finality of actions under...

  18. Cable Splicing Project/Maintenance Action AFSC 361X1

    DTIC Science & Technology

    1991-01-01

    standards for subordinates 53 D88 Evaluate progress of trainees 53 C55 Evaluate project drawings or specifications 52 25 LU - - K LUJ -x cr O L z nmtjCiCJ...0U co 0 ~ U). m u.. L -a cU+ 0. mL-~ S- 4-- CO x E S- Ln O : .0 0 *- u CL K ~ 0 a> ) C_ UL S.- (v a) nU -r Ln CA CU - S 0.- o ) a 04 0 - W -0 I_- -3...CU U) u cL E- U O D U)c -0 E a) .- (4--C-LA - S- a ) C - U )r - s- UU U 0..a’oIz K CU .- c () LL 0 U - a~ )U 0 . ’-C CU’ca) 4- --=DS- C -- D-C > 4-0

  19. Source modification special study. [Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1989-04-01

    One of the major issues that must be addressed during the evaluation of the efficiency of tailings embankment designs for compliance with groundwater standards is the estimation of source concentrations and the change in these concentrations with time. Because any effort to predict concentrations of contaminants in the uppermost aquifer requires a source concentration, data from these analyses are essential. Thetechnical approach of this study was twofold. The first approach was to investigate the rates of natural flushing of contaminants. Two sets of tailings samples were collected at two sites on the Old Rifle tailings pile at the Rifle UMTRA Project site in Colorado. One set of samples was collected at a site where the lower portion of the profile is continuously inundated with water and the other set was collected in anarea that only receives water from precipitation. The tailings samples were refluxed in strong acid (nitric acid) and the leachate was analyzed for hazardous constituents. The results of this investigation indicate that many of the hazardous constituents have been leached from the tailings at the wet site and that there has been little redistribution of elemental hazardous constituents at the dry site. The second approach involved a laboratory investigation of contaminant removal from tailings by doubly distilled water and two lixiviants. Tailings samples from the Gunnison, Colorado, UMTRA Project site were subjected to leaching by doubly distilled water, and by the lixiviants sodium bicarbonate and disodium ethylenediaminetetraacetic acid. The resulting data were tabulated and plotted with concentration as a function of pore volume. Evaluation of the data indicates that pore fluids should show a decrease in concentration after very few pore volumes of liquid have eluted through the tailings. It is also demonstrated that lixiviants significantly increase the solubility and rate of elution of all of the hazardous constituents.

  20. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  1. Calculation of the number of cancer deaths prevented by the Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    Miller, M.L.; Pomatto, C.B. ); Cornish, R.E. . Albuquerque Operations Office)

    1999-05-01

    The Uranium Mill Tailings Remedial Action Project has completed remedial action at 22 uranium mill tailings sites and about 5,000 properties (vicinity properties) where tailings were used in construction, at a total cost of $1.45 billion. This paper uses existing data from Environmental Impact Statements and Environmental Assessments, and vicinity property calculations, to determine the total number of cancer deaths averted by the Uranium Mill Tailings Remedial Action Project. The cost-effectiveness of remediating each site, the vicinity properties, and the entire project is calculated. The cost per cancer death averted was four orders of magnitude higher at the least cost-effective site than at the most cost-effective site.

  2. Calculation of the number of cancer deaths prevented by the Uranium Mill Tailings Remedial Action Project.

    PubMed

    Miller, M L; Cornish, R E; Pomatto, C B

    1999-05-01

    The Uranium Mill Tailings Remedial Action Project has completed remedial action at 22 uranium mill tailings sites and about 5,000 properties ("vicinity properties") where tailings were used in construction, at a total cost of $1.45 billion. This paper uses existing data from Environmental Impact Statements and Environmental Assessments, and vicinity property calculations, to determine the total number of cancer deaths averted by the Uranium Mill Tailings Remedial Action Project. The cost-effectiveness of remediating each site, the vicinity properties, and the entire project is calculated. The cost per cancer death averted was four orders of magnitude higher at the least cost-effective site than at the most cost-effective site.

  3. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    SciTech Connect

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  4. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    SciTech Connect

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  5. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1992-12-31

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

  6. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  7. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  8. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  9. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  10. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  11. [Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan]. Revision 4

    SciTech Connect

    Not Available

    1992-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

  12. 12 CFR 390.455 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... shall become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... section 38 of the FDI Act described in paragraph (a)(2) of this section, immediately upon receiving...

  13. 12 CFR 390.455 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... shall become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... section 38 of the FDI Act described in paragraph (a)(2) of this section, immediately upon receiving...

  14. 12 CFR 165.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Federal savings associations are subject to the restrictions contained in section 38(d) of the FDI Act on... undercapitalized, the savings association shall become subject to the provisions of section 38 of the FDI Act: (i... section 38 of the FDI Act described in paragraph (a)(2) of this section, immediately upon receiving...

  15. 12 CFR 165.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Federal savings associations are subject to the restrictions contained in section 38(d) of the FDI Act on... undercapitalized, the savings association shall become subject to the provisions of section 38 of the FDI Act: (i... section 38 of the FDI Act described in paragraph (a)(2) of this section, immediately upon receiving...

  16. 12 CFR 390.455 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... shall become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... section 38 of the FDI Act described in paragraph (a)(2) of this section, immediately upon receiving...

  17. Streamlined approach for environmental restoration plan for corrective action unit 416, Mud Pit, Project Shoal Area

    SciTech Connect

    1997-07-01

    This plan addresses the actions necessary for the restoration and closure of the Project Shoal Area (PSA), Surface Corrective Action Unit (CAU) 416, Mud Pit (Corrective Action Site No. 57-09-01), a pit that was used to store effluent produced during drilling of the Post-Shot Borehole PS-1 in 1963. This plan describes the activities that will occur at the site and the steps that will be taken to gather enough data to obtain a notice of completion from the Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented with the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996) and the Industrial Sites Quality Assurance Project Plan (DOE/NV, 1994). The SAFER process is being employed at this CAU where enough information exists about the nature and extent of contamination to propose an appropriate corrective action without completing a Corrective Action Decision Document and Corrective Action Plan. This process combines elements of the Data Quality Objective (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. This has already been completed for the mud pit so it will not be repeated here. The DQOs for the mud pit are presented in the Corrective Action Investigation Plan for Project Shoal Area, CAU No. 416 (DOE/NV, 1996). This observational approach provides a framework for managing uncertainty and planning decision making.

  18. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown.

  19. Counting state-lead enforcement NPL sites toward the CERCLA Section 116(e) remedial-action start mandate

    SciTech Connect

    Not Available

    1988-10-21

    The directive outlines the criteria and procedures for counting State-lead enforcement National Priorities List sites toward the CERCLA section 116(e) remedial action start mandate. The guidance supplements directive no. 9355.0-24 OSWER Strategy for Management Oversight of the CERCLA RA Start Mandate, dated December 28, 1987.

  20. Clients, Colleagues or Experts? Defining Identities in an Action Research Project

    ERIC Educational Resources Information Center

    Coco, Angela; Varnier, Catherine; Deftereos, Chris

    2007-01-01

    This article examines how discourses shaped and were shaped by participants' identities in a participatory action research (PAR) project in a tertiary education environment. The primary researcher and the director of the university's desktop publishing team explored the idea of working together to help the newly formed team to develop strategies…

  1. The Action--Reflection--Modelling (ARM) Pedagogical Approach for Teacher Education: A Malaysia-UK Project

    ERIC Educational Resources Information Center

    Jarvis, Joy; Dickerson, Claire; Thomas, Kit; Graham, Sally

    2014-01-01

    This article presents the Action--Reflection--Modelling (ARM) pedagogical approach for teacher education developed during a Malaysia-UK collaborative project to construct a Bachelor of Education (Honours) degree programme in Primary Mathematics, with English and Health and Physical Education as minor subjects. The degree programme was written…

  2. I Play, Therefore I Am: An Undergraduate Philosophical Action Research Project.

    ERIC Educational Resources Information Center

    Stoll, Sharon Kay; Beller, Jennifer M.; Mathews, Allison; Matthews, Julie; Trainer, Maria; Freitas, Brandon; McLaughlin, Casey; Milke, Mary

    2000-01-01

    Asked undergraduate students' opinions of Descartes' belief that the mind and body are separate, then had them conduct action research projects examining whether the mind-body dilemma might be overcome if teachers valued the essential nature of play and applied it to sport and physical education. Results supported the hypothesis that physical…

  3. Mirror Images: Teaching Writing in Black and White. Webster Groves Action Research Project.

    ERIC Educational Resources Information Center

    Krater, Joan; And Others

    Presenting classroom experiences and a process to help writing teachers see their own hard-to-reach students with new eyes, this book tells the story of a 6-year action research project committed to building classroom environments where cultural differences are affirmed and high achievement is fostered among all students. The book notes that the…

  4. Culminating Experience Action Research Projects, Volume 15, Part 2, Fall 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.

    2009-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience or with school employment. This course, Education…

  5. Culminating Experience Action Research Projects, Volume 15, Part 1, Fall 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  6. Conscious Engagement in Undergraduate Male Nursing Students: Facilitating Voice through an Action Research Project

    ERIC Educational Resources Information Center

    Maykut, Colleen A.; Lee, Andrew; Argueta, Nelson Garcia; Grant, Sean; Miller, Cole

    2016-01-01

    Although women have made significant progress into traditionally male-dominated professions, such as medicine and engineering, the same cannot be said of men in the nursing profession. Utilizing a critical social theory perspective, an action research project was designed to encourage participants, current male nursing students and alumni of…

  7. Chicana Feminist Strategies in a Participatory Action Research Project with Transnational Latina Youth

    ERIC Educational Resources Information Center

    Sanchez, Patricia

    2009-01-01

    This article discusses a participatory action research (PAR) project carried out with three transnational Latina youth in northern California and how the university researcher incorporated Chicana feminist strategies in the study. PAR and Chicana feminism place at the heart of research the knowledge that ordinary people produce, referring to this…

  8. Improving Attainment through Action Research: An Introduction to Hillingdon's Raising Achievement Project.

    ERIC Educational Resources Information Center

    Irshad, Khalid; Imrie, Jean

    1997-01-01

    Describes the Raising Achievement Project designed to address the need for more information on the performance of ethnic minorities for whom English is an additional language, and the need for support for children who have passed the initial stages of learning English. It also describes the action research model used to answer questions about…

  9. The Evaluation of an Early Childhood Teacher Preparation Program: An Action Research Project

    ERIC Educational Resources Information Center

    Ragno, Kerry Sullivan

    2013-01-01

    The purpose of this dissertation was to evaluate the effectiveness of an Early Childhood Development Associate of Applied Science (AAS) degree program at one community college as part of an ongoing action research project. Prior to this dissertation study, external and internal barriers prevented the associate degree program stakeholders from…

  10. The Early Childhood Education of Aboriginal Australians: A Review of Six Action-Research Projects.

    ERIC Educational Resources Information Center

    Teasdale, G. R.; Whitelaw, A. J.

    The book describes the setting, objectives, program, evaluation and achievement of six innovative action-research early childhood education projects for Aboriginal Australian children, traces various previous attempts to provide education, and provides an historical background of the estimated 140,000 Aboriginal people who make up 1% of…

  11. Culminating Experience Action Research Projects, Volume 8, Part 1, Spring 2006

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Fritch, Sarah C., Ed.

    2007-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  12. A Survey of Food Projects in the English NHS Regions and Health Action Zones in 2001

    ERIC Educational Resources Information Center

    Caraher, Martin; Cowburn, Gill

    2004-01-01

    Background and Objective: This article sets out the findings from an analysis of food projects, with a particular emphasis on fruit and vegetables, from the 26 Health Action Zones (HAZs) in England and those taking place within the former NHS regional areas in 2001. The objective was to gather information on the existing practice to inform future…

  13. Culminating Experience Action Research Projects, Volume 16, Part 1, Spring 2010

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  14. Some Recurrent Disagreements about Social Change Which Affect Action Research Projects.

    ERIC Educational Resources Information Center

    Hofstetter, Heather N.; Hofstetter, Merlin I.

    This paper describes the beliefs and values of a pluralistic approach to social change and of four competing approaches: social Darwinism, functionalism, militancy, and conflict theory. Stressing the alienation and dogmatism of the competing approaches, the authors relate each approach to its operation in community action projects. Social…

  15. Improving Teachers' Practices through Supervision and Observations by School Principals: An Action Research Project

    ERIC Educational Resources Information Center

    Taylor, Latasha M.

    2013-01-01

    This study focused on the impact of a new observation tool for principals to utilize and the effects it has on improving teachers' instruction and influencing best practices. The action research project explored the impact and influence that a well-developed observation tool could possess to help address areas of need; essentially, focusing on how…

  16. An Action Research Project Exploring the Psychology Curriculum and Transitions to Employment

    ERIC Educational Resources Information Center

    McMurray, Isabella; Roberts, Pat; Robertson, Ian; Teoh, Kevin

    2011-01-01

    Within the UK, traditional subject-specific areas are increasingly being complemented by the provision of opportunities to foster students' personal development planning as an aide to support their future employment and lifelong learning. This paper describes an action research project which examined employability skills within a psychology…

  17. "Who Did What?": A Participatory Action Research Project to Increase Group Capacity for Advocacy

    ERIC Educational Resources Information Center

    Garcia-Iriarte, E.; Kramer, J. C.; Kramer, J. M.; Hammel, J.

    2009-01-01

    Background: This participatory action research (PAR) project involved a collaboration with a self-advocacy group of people with intellectual disabilities that sought to build group capacity for advocacy. Materials and Methods: This study used a focus group, sustained participatory engagement and a reflexive process to gather qualitative and…

  18. Participatory Action Research: Reflections on Critical Incidents in a PAR Project.

    ERIC Educational Resources Information Center

    Santelli, Betsy; Singer, George H. S.; DiVenere, Nancy; Ginsberg, Connie; Powers, Laurie E.

    1998-01-01

    This article describes a participatory action research (PAR) project designed to evaluate Parent to Parent programs in five states. The process of developing a shared understanding of the program and of the purpose for evaluating them, along with an on-going willingness of parents and researchers to compromise, led to creative solutions to…

  19. The QUIPPED Project: Exploring Relevance and Rigor of Action Research Using Established Principles and Criteria

    ERIC Educational Resources Information Center

    Chapman, Christine; Paterson, Margo; Medves, Jennifer M.

    2011-01-01

    This paper is the last in a series of three manuscripts published in the TQR journal over the past few years. This work is part of a larger program of research that has been carried out by a team of researchers detailing various aspects of a three year action research project carried out from 2005 and 2008. This particular paper addresses issues…

  20. Aircraft engine hot section technology: An overview of the HOST Project

    NASA Technical Reports Server (NTRS)

    Sokolowski, Daniel E.; Hirschberg, Marvin H.

    1987-01-01

    NASA sponsored the Turbine Engine Hot Section Technology (HOST) Project to address the need for improved durability in advanced aircraft engine combustors and turbines. Analytical and experimental activities aimed at more accurate prediction of the aerothermal environment, the thermomechanical loads, the material behavior and structural responses to loads, and life predictions for cyclic high-temperature operation were underway for the last 7 years. The project has involved representatives from six engineering disciplines who are spread across three work sectors (industry, academia, and NASA). The HOST Project not only initiated and sponsored 70 major activities, but was also the keystone in joining the multiple disciplines and work sectors to focus on critical research needs. A broad overview of the project is given along with initial indications of the project's impact.

  1. Aircraft engine hot section technology: An overview of the HOST Project

    NASA Technical Reports Server (NTRS)

    Sokolowski, Daniel E.; Hirschberg, Marvin H.

    1990-01-01

    NASA sponsored the Turbine Engine Hot Section (HOST) project to address the need for improved durability in advanced aircraft engine combustors and turbines. Analytical and experimental activities aimed at more accurate prediction of the aerothermal environment, the thermomechanical loads, the material behavior and structural responses to loads, and life predictions for cyclic high temperature operation were conducted from 1980 to 1987. The project involved representatives from six engineering disciplines who are spread across three work disciplines - industry, academia, and NASA. The HOST project not only initiated and sponsored 70 major activities, but also was the keystone in joining the multiple disciplines and work sectors to focus on critical research needs. A broad overview of the project is given along with initial indications of the project's impact.

  2. [Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1992-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

  3. [Constructivist evaluation, under an integrating and intersectoral approach, of actions of the Disque Idoso Project in Sobral (CE, Brazil)].

    PubMed

    Freitas, Cibelly Aliny Siqueira Lima; Teófilo, Tiago José Silveira

    2010-09-01

    The population aging in Brazil and in the world is a reason for an epidemic inquietude. So, the violence against senior people has been considered a problem of public health. This study takes as context the health need of seniors that suffer of violence, aiming to evaluate in a constructive way the Disque Idoso Project in Sobral (Ceará, Brazil). We used Furtado's Constructivist Method of Evaluation, which provides practices of participative evaluation. Trying to reach such perspective, we are guided by paths of the integrative approach (inter, multi and transdisciplinary) and intersectoral. We accomplished the focal groups with representatives of the sections of health, social assistance, justice and senior, the benefited by the project as well as others that contribute to its development. When interacting with the professionals that act in the project headquarters we understood that there is a fear in publishing their work, because there is not structure to enlarge the attendance. The group believes that the efficiency of its actions is limited due to the lack of transport and other professionals. For the professionals of the support social networks, the project should look for intersectoral performance, once it intends to reach a complete attendance. For the seniors, the project is quite valid and needs to be consolidated in the district.

  4. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    SciTech Connect

    Not Available

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date.

  5. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... undercapitalized savings associations. In addition to the provisions of section 38 of the FDI Act described...

  6. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... undercapitalized savings associations. In addition to the provisions of section 38 of the FDI Act described...

  7. 12 CFR 6.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... critically undercapitalized, the bank shall become subject to the provisions of section 38 of the FDI Act— (i... undercapitalized banks. In addition to the provisions of section 38 of the FDI Act described in paragraph (a)(2)...

  8. 12 CFR 208.45 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital distributions... the FDI Act: (i) Restricting payment of capital distributions and management fees (section 38(d)); (ii... undercapitalized, and critically undercapitalized banks. In addition to the provisions of section 38 of the FDI...

  9. 12 CFR 6.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... critically undercapitalized, the bank shall become subject to the provisions of section 38 of the FDI Act— (i... undercapitalized banks. In addition to the provisions of section 38 of the FDI Act described in paragraph (a)(2)...

  10. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... undercapitalized savings associations. In addition to the provisions of section 38 of the FDI Act described...

  11. 12 CFR 6.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... critically undercapitalized, the bank shall become subject to the provisions of section 38 of the FDI Act— (i... undercapitalized banks. In addition to the provisions of section 38 of the FDI Act described in paragraph (a)(2)...

  12. 12 CFR 208.45 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital distributions... the FDI Act: (i) Restricting payment of capital distributions and management fees (section 38(d)); (ii... undercapitalized, and critically undercapitalized banks. In addition to the provisions of section 38 of the FDI...

  13. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... undercapitalized savings associations. In addition to the provisions of section 38 of the FDI Act described...

  14. 12 CFR 208.45 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital distributions... the FDI Act: (i) Restricting payment of capital distributions and management fees (section 38(d)); (ii... undercapitalized, and critically undercapitalized banks. In addition to the provisions of section 38 of the FDI...

  15. 12 CFR 208.45 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital distributions... the FDI Act: (i) Restricting payment of capital distributions and management fees (section 38(d)); (ii... undercapitalized, and critically undercapitalized banks. In addition to the provisions of section 38 of the FDI...

  16. 12 CFR 208.45 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital distributions... the FDI Act: (i) Restricting payment of capital distributions and management fees (section 38(d)); (ii... undercapitalized, and critically undercapitalized banks. In addition to the provisions of section 38 of the FDI...

  17. 12 CFR 6.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... critically undercapitalized, the bank shall become subject to the provisions of section 38 of the FDI Act— (i... undercapitalized banks. In addition to the provisions of section 38 of the FDI Act described in paragraph (a)(2)...

  18. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... undercapitalized savings associations. In addition to the provisions of section 38 of the FDI Act described...

  19. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock... a proposed highway project, Sunrise Project, I-205 to Rock Creek Junction, Clackamas County, Oregon..., NE., Suite 100, Salem, Oregon 97301, Telephone: (503) 587-4716. The Sunrise Project, I-205 to...

  20. Implementing the "Marketing You" Project in Large Sections of Principles of Marketing

    ERIC Educational Resources Information Center

    Smith, Karen H.

    2004-01-01

    There is mounting pressure on business education to increase experiential learning at the same time that budget constraints are forcing universities to increase class size. This article explains the design and implementation of the "Marketing You" project in two large sections of Principles of Marketing to bring experiential learning into the…

  1. 76 FR 38162 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... AGENCY Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery and... granting a project waiver of the Buy American requirements of ARRA Section 1605 under the authority of.... This is a project-specific waiver and only applies to the use of the specified products for the...

  2. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  3. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  4. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  5. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  6. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  7. 77 FR 65929 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River.... Sec. 139(l)(1). The actions relate to the Tappan Zee Hudson River Crossing Project located in Rockland... the following highway project in the State of New York: Tappan Zee Hudson River Crossing...

  8. Toward Solutions: The Work of the Physics Action-Research Group. Learning in Science Project. Working Paper No. 32.

    ERIC Educational Resources Information Center

    Osborne, Roger; Schollum, Brendan

    In the action-research phase of the Learning in Science Project, four groups of people worked on problems identified in the project's second (in-depth) phase. The Physics action-research group considered problems related to the teaching and learning of ideas associated with force and motion, suggesting that children's ideas of these concepts might…

  9. Project Northland high school interventions: community action to reduce adolescent alcohol use.

    PubMed

    Perry, C L; Williams, C L; Komro, K A; Veblen-Mortenson, S; Forster, J L; Bernstein-Lachter, R; Pratt, L K; Dudovitz, B; Munson, K A; Farbakhsh, K; Finnegan, J; McGovern, P

    2000-02-01

    Project Northland is a randomized community trial initially implemented in 24 school districts and communities in northeastern Minnesota, with goals of delaying onset and reducing adolescent alcohol use using community-wide, multiyear, multiple interventions. The study targets the Class of 1998 from the 6th to 12th grades (1991-1998). The early adolescent phase of Project Northland has been completed, and reductions in the prevalence of alcohol use at the end of 8th grade were achieved. Phase II of Project Northland, targeting 11th- and 12th-grade students, uses five major strategies: (1) direct action community organizing methods to encourage citizens to reduce underage access to alcohol, (2) youth development involving high school students in youth action teams, (3) print media to support community organizing and youth action initiatives and communicate healthy norms about underage drinking (e.g., providing alcohol to minors is unacceptable), (4) parent education and involvement, and (5) a classroom-based curriculum for 11th-grade students. This article describes the background, design, implementation, and process measures of the intervention strategies for Phase II of Project Northland.

  10. Action Memorandum for General Decommissioning Activities under the Idaho Cleanup Project

    SciTech Connect

    S. L. Reno

    2006-10-26

    This Action Memorandum documents the selected alternative to perform general decommissioning activities at the Idaho National Laboratory (INL) under the Idaho Cleanup Project (ICP). Preparation of this Action Memorandum has been performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the "Superfund Amendments and Reauthorization Act of 1986", and in accordance with the "National Oil and Hazardous Substances Pollution Contingency Plan". An engineering evaluation/cost analysis (EE/CA) was prepared and released for public comment and evaluated alternatives to accomplish the decommissioning of excess buildings and structures whose missions havve been completed.

  11. An integrated methodology for assessment and selection of the project risk response actions.

    PubMed

    Seyedhoseini, Seyed Mohammad; Noori, Siamak; Hatefi, Mohammad Ali

    2009-05-01

    In a systematic process of project risk management, after risk assessment is implemented, the risk analysts encounter the phase of assessment and selection of the project risk response actions (RA). As indicated by many researchers, there are less systematic and well-developed solutions in the area of risk response assessment and selection. The present article introduces a methodology including a modeling approach with the objective of selecting a set of RA that minimizes the undesirable deviation from achieving the project scope. The developed objective function comprises the three key success criteria of a project, namely, time, quality, and cost. Our model integrates overall project management into the project risk response planning (P2RP). Furthermore, the proposed model stresses on an equivalent importance for both "risk" and "response." We believe that applying the proposed model helps the project risk analyst in most effective and efficient manner dealing with his or her complicated RA selection problems. The application of the proposed model was implemented in projects in the construction industry in which it showed tremendous time, cost, and quality improvements.

  12. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  13. Sunset Dates of Chemicals Subject to Final TSCA Section 4 and Related 12(b) Actions

    EPA Pesticide Factsheets

    This Table lists, in ascending chemical Abstract Service (CAS) Registry number order, all chemical substances and mixtures that are and/or have been the subject of final TSCA Section 4 test rules and/or TSCA Section 4 enforceable consent agreements/orders.

  14. 12 CFR 325.105 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the FDI Act on payment of capital distributions and management fees. (2) Provisions applicable to... the provisions of section 38 of the FDI Act: (i) Restricting payment of capital distributions and... to the provisions of section 38 of the FDI Act described in paragraph (a)(2) of this...

  15. 12 CFR 325.105 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the FDI Act on payment of capital distributions and management fees. (2) Provisions applicable to... the provisions of section 38 of the FDI Act: (i) Restricting payment of capital distributions and... to the provisions of section 38 of the FDI Act described in paragraph (a)(2) of this...

  16. 12 CFR 325.105 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the FDI Act on payment of capital distributions and management fees. (2) Provisions applicable to... the provisions of section 38 of the FDI Act: (i) Restricting payment of capital distributions and... to the provisions of section 38 of the FDI Act described in paragraph (a)(2) of this...

  17. 12 CFR 325.105 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the FDI Act on payment of capital distributions and management fees. (2) Provisions applicable to... the provisions of section 38 of the FDI Act: (i) Restricting payment of capital distributions and... to the provisions of section 38 of the FDI Act described in paragraph (a)(2) of this...

  18. 12 CFR 325.105 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the FDI Act on payment of capital distributions and management fees. (2) Provisions applicable to... the provisions of section 38 of the FDI Act: (i) Restricting payment of capital distributions and... to the provisions of section 38 of the FDI Act described in paragraph (a)(2) of this...

  19. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    SciTech Connect

    1997-12-31

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project.

  20. 78 FR 67036 - Extension of Deadline for Action on the Section 126 Petition From Eliot, Maine

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ...-and-comment process required for our review of a petition submitted by the Town of Eliot, Maine... Air Quality Planning and Standards (C504-04), U.S. EPA, Research Triangle Park, North Carolina 27709... procedural action to extend the deadline for the EPA to respond to a petition from the Town of Eliot,...

  1. 29 CFR 1607.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... voluntary action to achieve equal employment opportunity. As with most management objectives, a systematic... be an analysis of the employer's work force to determine whether precentages of sex, race, or ethnic... group in question; (c) A systematic effort to organize work and redesign jobs in ways that...

  2. Technique of estimation of actual strength of a gas pipeline section at its deformation in landslide action zone

    SciTech Connect

    Tcherni, V.P.

    1996-12-31

    The technique is given which permits determination of stress and strain state (SSS) and estimation of actual strength of a section of a buried main gas pipeline (GP) in the case of its deformation in a landslide action zone. The technique is based on the use of three-dimensional coordinates of axial points of the deformed GP section. These coordinates are received by a full-scale survey. The deformed axis of the surveyed GP section is described by the polynomial. The unknown coefficients of the polynomial can be determined from the boundary conditions at points of connection with contiguous undeformed sections as well as by use of minimization methods in mathematical processing of full-scale survey results. The resulting form of GP section`s axis allows one to determine curvatures and, accordingly, bending moments along all the length of the considered section. The influence of soil resistance to longitudinal displacements of a pipeline is used to determine longitudinal forces. Resulting values of bending moments and axial forces as well as the known value of internal pressure are used to analyze all necessary components of an actual SSS of pipeline section and to estimate its strength by elastic analysis.

  3. WSSRAP chemical plant geotechnical investigations for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1990-12-01

    This document has been prepared for the United states Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which consists of MK-Ferguson Company (MKF) and Morrison Knudsen Corporation Environmental Services Group (MKES) with Jacobs Engineering Group (JEG) as MKF's predesignated subcontractor. This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. The WSCP/RP is the proposed disposal cell (DC) site. 39 refs., 24 figs., 12 tabs.

  4. 2008 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2009-03-01

    This report presents the 2008 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof of concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the site during 2008. This is the second groundwater monitoring report prepared by LM for the PSA

  5. 2010 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2011-02-01

    This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended March 2010) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes the results from the groundwater monitoring program during fiscal year 2010.

  6. 2009 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2010-03-01

    This report presents the 2009 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the PSA during fiscal year 2009.

  7. Civic Action Projects Report, 1 January 1965-31 December 1965. Volume 1

    DTIC Science & Technology

    1966-06-22

    construcELon and ship repair facilities in Argentina, the Navy utilizes its facilities, on a non-competitive basis with civilian industry , tr repair...been quite industrious during the past year. The following projects were supported by the committee, with excellent results: a. Potable water...the Escuela Militär de Ingenieria , to provide a basic reference lihrary on civic action. 9. PROBLEM AREAS. Seme excellent press releases have been

  8. Action-projection in Japanese conversation: topic particles wa, mo, and tte for triggering categorization activities

    PubMed Central

    Tanaka, Hiroko

    2015-01-01

    Conversation analytic work has revealed how anticipatory completions and preemptive actions can offer invaluable glimpses into the cognitive, contextual, grammatical, and temporal bases of projectability in turn-taking, by virtue of their potential not only as a display of participants' online prediction of roughly what it might take to complete a turn-in-progress but also to plan the next move. While the predicate-final word order and the incremental transformability of turns in Japanese generally lead to delayed projectability of turn-endings, this may be partially offset by the capacity of certain postpositional particles to trigger and propel prospective action trajectories. This article engages in a case study of the topic particle wa (and related particles mo and tte), by demonstrating how its grammatical affordances, the categorization activities, and cognitive processing it can set in motion, coupled with the immediate contextual, and temporal-productional features may coalesce to a point of critical mass, thereby enhancing the projectability of the not-yet-produced trajectory of the current turn. The discussion attempts to contribute to recent debates on ways language-specific lexicogrammatical resources are deeply interlinked with the types of opportunities that are provided for social action. PMID:26379565

  9. Cooperative and Context-Based Learning on Eletrochemical Cells in Lower Secondary Chemistry: A Project of Participatory Action Research

    ERIC Educational Resources Information Center

    Markic, Silvija; Eilks, Ingo

    2006-01-01

    This paper discusses a project of Participatory Action Research (PAR) on lower secondary chemistry education. In this ongoing project, practicing teachers and university researchers in chemical education jointly carry out projects for developing and evaluating new lesson plans. The focus of the PAR group is to develop teaching/learning activities…

  10. 78 FR 64592 - Notice of Final Federal Agency Actions on the Stehekin Valley Road Improvement Project From the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... Improvement Project From the Stehekin River Corridor Implementation Plan: Chelan County, Washington AGENCY... Improvement project from the Stehekin River Corridor Implementation Plan in Chelan County, Washington. This action grants approval for the road improvement project element of the plan. DATES: By this notice,...

  11. Key programmatic steps and activities for implementing the Uranium Mill Tailings Remedial Action Project. [UMTRA Project

    SciTech Connect

    Not Available

    1985-07-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) was enacted based upon findings by Congress that uranium mill tailings located at active and inactive hazard to the public, and that protection of the public health, safety and welfare, and the regulations of interstate commerce, require that every reasonable effort be made to provide for the stabilization, disposal, and control in a safe and environmentally sound manner of such tailings in order to prevent or minimize radon diffusion into the environment and to prevent or minimize other environmental hazards from such tailings.'' A general understanding of the steps leading to elimination of the hazards associated with designated uranium mill tailings sites, and the parties involved in that effort, are presented in this document. A representative schedule is also presented in this document to show both program sequence and activity interdependence. Those activities that have the most potential to influence program duration, because of the significant amount of additional time that may be required, include identification and selection of a suitable site, field data collection delays due to weather, actual acquisition of the designated or alternate disposal site, construction delays due to weather, and site licensing. This document provides an understanding of the steps, the sequence, the parties involved, and a representative duration of activities leading to remedial action and cleanup at the designated inactive uranium mill tailings sites. 10 refs., 5 figs., 1 tab.

  12. 29 CFR 1607.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...). 1607.17 Section 1607.17 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY... do the job. There is ample evidence in all sectors of our society that such equal access frequently... Rights Act of 1964, Executive Order 11246, and related laws and regulations—all of which...

  13. Administrative Action to End Discrimination Based on Handicap: HEW's Section 504 Regulation.

    ERIC Educational Resources Information Center

    Engebretson, Mark F.

    1979-01-01

    Examines the drafting of regulations under Section 504 of the Rehabilitation Act of 1973, which prohibits discrimination against handicapped persons by recipients of federal funds. Available from Harvard Legislative Research Bureau, Langdell Hall, Harvard Law School, Cambridge, MA 02138; single copy $4.00. (Author/IRT)

  14. Disease management projects and the Chronic Care Model in action: baseline qualitative research

    PubMed Central

    2012-01-01

    Background Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in the Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in the Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Methods Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project’s chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders’ action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. Results This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved

  15. Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee

    SciTech Connect

    1996-08-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant.

  16. 75 FR 67718 - Notice of a Project Waiver of Section 1605: (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... unless all of the iron, steel, and manufactured goods used in the project are produced in the United... AGENCY Notice of a Project Waiver of Section 1605: (Buy American Requirement) of the American Recovery and Reinvestment Act of 2009 (ARRA) to the Town of Windsor, CA; Project 4910017-033 Funded by...

  17. Industrial Sites Project Establishment of Final Action Levels, Rev. No.: 0

    SciTech Connect

    Boehlecke, Robert F.

    2006-02-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  18. A case study of the development of environmental action projects from the framework of participatory action research within two middle school classrooms

    NASA Astrophysics Data System (ADS)

    Charmatz, Kim

    The purpose of this study was to understand student and teacher empowerment through a socially critical environmental education perspective. The main research question guiding this study was: How do participants make sense of a learning experience in which students design and carry out an environmental action project in their community? This study used participatory action research and critical theory as practical and theoretical frameworks. These frameworks were relevant as this study sought to examine social change, power, and relationships through participants' experiences. The context of this study was within one seventh and one eighth grade classroom participating in environmental projects. The study was conducted in spring 2005 with an additional follow-up data collection period during spring 2006. The school was located in a densely populated metropolitan suburb. Fifty-three students, a teacher researcher, and three science teachers participated. Data sources were written surveys, scores on Middle School Environmental Literacy Survey Instrument (MSELI), observations, interviews, and student work. This study used a mixed methodological approach. Quantitative data analysis involved dependent samples t-test scores on the MSELI before and after the completion of the projects. Qualitative data were analyzed using an inductive analysis approach. This study has implications for educators interested in democratic education. Environmental action projects provide a context for students and teachers to learn interdisciplinary content knowledge, develop personal beliefs, and learn ways to take action in their communities. This pedagogy has the potential to increase cooperation, communication, and tensions within school communities. Students' participation in the development of environmental action projects may lead to feelings of empowerment or being able to make a difference in their community, as an individual or member of a group. Future research is needed to discern

  19. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado

    SciTech Connect

    Not Available

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown.

  20. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    SciTech Connect

    Not Available

    1993-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  1. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    SciTech Connect

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  2. Interim Response Action Basin F Liquid Incineration Project Final Draft Human Health Risk Assessment. Volume 1.

    DTIC Science & Technology

    1991-07-01

    91222R02 2ND COPY Interim Response Action Basin F Liquid Incineration Project FINAL DRAFT HUMAN HEALTH RISK ASSESSMENT V olumne I Preplaced Remedial...The Use of OELs and NAAQSs for Calculating Inhalation RfJ)s 9-13 9.4.2.2 Adjustments to Inhalation RfDs 9-14 793C/FM V 7/22/91 TABLE OF CONTENTS...HENDERSON RTHOL THOL HAZELTIN A I LE-- f V , Rocky Mountain WELB DA Arsenal A"ADA AA -AIL- VIM IT RUM Doi T p- 0 Denver kl& MOR SHER DAN r go, "- V

  3. ACTION. 1977 Annual Report.

    ERIC Educational Resources Information Center

    ACTION, Washington, DC.

    In this report are described projects and activities undertaken by ACTION's volunteer programs in 1977. The first section concentrates on reviews conducted, including a major review of ACTION's domestic volunteer programs and the management systems supporting them and an assessment of its programs using the Zero-Base Budget approach called for by…

  4. 76 FR 142 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-03

    ... AGENCY Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and... Buy American Requirements of ARRA Section 1605 under the authority of Section 1605(b)(2) [manufactured... waiver of the Buy American provisions is justified. The Regional Administrator is making...

  5. Chicana feminist strategies in a participatory action research project with transnational Latina youth.

    PubMed

    Sánchez, Patricia

    2009-01-01

    This article discusses a participatory action research (PAR) project carried out with three transnational Latina youth in northern California and how the university researcher incorporated Chicana feminist strategies in the study. PAR and Chicana feminism place at the heart of research the knowledge that ordinary people produce, referring to this knowledge as conocimientos, or "homemade theory." The author discusses the project, the collaborative writing of a children's book based on two years of data collection, the challenges in being both an insider and an outsider to the community, how the youth created a counterstory based on their transnational immigrant lifestyle, and how an out-of-school setting promoted engaged research with urban teens.

  6. Quarry geotechnical report for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1990-11-01

    This report has been prepared for the United States Department of Energy's (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which is MK-Ferguson Company (MK-Ferguson) with Jacobs Engineering Group (JEG) as its designated subcontractor. The Weldon Spring site (WSS) comprises the Weldon Spring quarry area and the Weldon Spring chemical plant and raffinate pit areas. This report presents the results of geotechnical investigations conducted during 1989--1990 at the proposed Weldon Spring quarry staging and water treatment facilities in the quarry area. The facilities are intended for treatment of water removed from the quarry area. An access road and a decontamination pad will be necessary for handling and transportation of bulk waste. Results of previous geotechnical investigations performed by other geoscience and environmental engineering firms in the quarry area, were reviewed, summarized and incorporated into this report. Well logging, stratigraphy data, piezometer data, elevations, and soil characteristics are also included.

  7. Community action for preventing HIV in Cambodia: evaluation of a 3-year project.

    PubMed

    Sopheab, Heng; Fylkesnes, Knut; Lim, Yi; Godwin, Peter

    2008-07-01

    The 'Community Action for Preventing HIV/AIDS Project' was implemented in four provinces in Cambodia (2001-04) to support a comprehensive set of HIV prevention efforts. Implementation was strictly monitored in terms of inputs, outputs and outcomes. We examine changes in these variables during the project period to assess the extent to which they were related to the project. Inputs and outputs were monitored regularly by supervision and quarterly project reports. Baseline and follow-up surveys were conducted on 10 target groups to measure changes in outcome indicators related to sexual risk behaviours, uses of HIV voluntary counselling and testing (VCT), self-reported sexually transmitted infections (STIs) and other indicators. The analyses use data from surveys and from project monitoring. Spending on HIV-related work at provincial level increased markedly, including investments in VCT, STI facilities and staff training. Yearly expenditure increased about 7-fold compared with years immediately preceding the project. VCT centres increased from 3 to 12, numbers of counsellors from 10 to 27, and numbers of client visits more than doubled. STI laboratory facilities increased from 0 to 6 with coverage of STI check-ups among sex workers increasing from 70% to 93% and a decline in men attending STI clinics. The survey results indicate significant changes in a number of major outcome indicators such as consistent condom use related to sex work (>80%), HIV testing and counselling after HIV tests, especially among police (42 to 72%, P < 0.001) and brothel-based sex workers (48 to 89%, P < 0.001). Self-reported STIs declined in most groups. Finally, the programmatic systems for planning, managing and monitoring implementation of activities at both central and provincial level, as well as technical guidelines, developed under the project have become the standard for the national programme. In conclusion, the project appears to have been comprehensive and a number of favourable

  8. A time projection chamber for high accuracy and precision fission cross-section measurements

    DOE PAGES

    Heffner, M.; Asner, D. M.; Baker, R. G.; ...

    2014-05-22

    The fission Time Projection Chamber (fissionTPC) is a compact (15 cm diameter) two-chamber MICROMEGAS TPC designed to make precision cross-section measurements of neutron-induced fission. The actinide targets are placed on the central cathode and irradiated with a neutron beam that passes axially through the TPC inducing fission in the target. The 4π acceptance for fission fragments and complete charged particle track reconstruction are powerful features of the fissionTPC which will be used to measure fission cross-sections and examine the associated systematic errors. This study provides a detailed description of the design requirements, the design solutions, and the initial performance ofmore » the fissionTPC.« less

  9. A time projection chamber for high accuracy and precision fission cross-section measurements

    SciTech Connect

    Heffner, M.; Asner, D. M.; Baker, R. G.; Baker, J.; Barrett, S.; Brune, C.; Bundgaard, J.; Burgett, E.; Carter, D.; Cunningham, M.; Deaven, J.; Duke, D. L.; Greife, U.; Grimes, S.; Hager, U.; Hertel, N.; Hill, T.; Isenhower, D.; Jewell, K.; King, J.; Klay, J. L.; Kleinrath, V.; Kornilov, N.; Kudo, R.; Laptev, A. B.; Leonard, M.; Loveland, W.; Massey, T. N.; McGrath, C.; Meharchand, R.; Montoya, L.; Pickle, N.; Qu, H.; Riot, V.; Ruz, J.; Sangiorgio, S.; Seilhan, B.; Sharma, S.; Snyder, L.; Stave, S.; Tatishvili, G.; Thornton, R. T.; Tovesson, F.; Towell, D.; Towell, R. S.; Watson, S.; Wendt, B.; Wood, L.; Yao, L.

    2014-05-22

    The fission Time Projection Chamber (fissionTPC) is a compact (15 cm diameter) two-chamber MICROMEGAS TPC designed to make precision cross-section measurements of neutron-induced fission. The actinide targets are placed on the central cathode and irradiated with a neutron beam that passes axially through the TPC inducing fission in the target. The 4π acceptance for fission fragments and complete charged particle track reconstruction are powerful features of the fissionTPC which will be used to measure fission cross-sections and examine the associated systematic errors. This study provides a detailed description of the design requirements, the design solutions, and the initial performance of the fissionTPC.

  10. A time projection chamber for high accuracy and precision fission cross-section measurements

    NASA Astrophysics Data System (ADS)

    Heffner, M.; Asner, D. M.; Baker, R. G.; Baker, J.; Barrett, S.; Brune, C.; Bundgaard, J.; Burgett, E.; Carter, D.; Cunningham, M.; Deaven, J.; Duke, D. L.; Greife, U.; Grimes, S.; Hager, U.; Hertel, N.; Hill, T.; Isenhower, D.; Jewell, K.; King, J.; Klay, J. L.; Kleinrath, V.; Kornilov, N.; Kudo, R.; Laptev, A. B.; Leonard, M.; Loveland, W.; Massey, T. N.; McGrath, C.; Meharchand, R.; Montoya, L.; Pickle, N.; Qu, H.; Riot, V.; Ruz, J.; Sangiorgio, S.; Seilhan, B.; Sharma, S.; Snyder, L.; Stave, S.; Tatishvili, G.; Thornton, R. T.; Tovesson, F.; Towell, D.; Towell, R. S.; Watson, S.; Wendt, B.; Wood, L.; Yao, L.

    2014-09-01

    The fission Time Projection Chamber (fissionTPC) is a compact (15 cm diameter) two-chamber MICROMEGAS TPC designed to make precision cross-section measurements of neutron-induced fission. The actinide targets are placed on the central cathode and irradiated with a neutron beam that passes axially through the TPC inducing fission in the target. The 4π acceptance for fission fragments and complete charged particle track reconstruction are powerful features of the fissionTPC which will be used to measure fission cross-sections and examine the associated systematic errors. This paper provides a detailed description of the design requirements, the design solutions, and the initial performance of the fissionTPC.

  11. A Time Projection Chamber for High Accuracy and Precision Fission Cross-Section Measurements

    SciTech Connect

    T. Hill; K. Jewell; M. Heffner; D. Carter; M. Cunningham; V. Riot; J. Ruz; S. Sangiorgio; B. Seilhan; L. Snyder; D. M. Asner; S. Stave; G. Tatishvili; L. Wood; R. G. Baker; J. L. Klay; R. Kudo; S. Barrett; J. King; M. Leonard; W. Loveland; L. Yao; C. Brune; S. Grimes; N. Kornilov; T. N. Massey; J. Bundgaard; D. L. Duke; U. Greife; U. Hager; E. Burgett; J. Deaven; V. Kleinrath; C. McGrath; B. Wendt; N. Hertel; D. Isenhower; N. Pickle; H. Qu; S. Sharma; R. T. Thornton; D. Tovwell; R. S. Towell; S.

    2014-09-01

    The fission Time Projection Chamber (fissionTPC) is a compact (15 cm diameter) two-chamber MICROMEGAS TPC designed to make precision cross-section measurements of neutron-induced fission. The actinide targets are placed on the central cathode and irradiated with a neutron beam that passes axially through the TPC inducing fission in the target. The 4p acceptance for fission fragments and complete charged particle track reconstruction are powerful features of the fissionTPC which will be used to measure fission cross-sections and examine the associated systematic errors. This paper provides a detailed description of the design requirements, the design solutions, and the initial performance of the fissionTPC.

  12. 78 FR 42151 - Notice of Final Federal Agency Actions on the Goethals Bridge Replacement Project in New York and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... of a replacement bridge with a new six-lane structure directly and entirely south of the existing... Federal Highway Administration Notice of Final Federal Agency Actions on the Goethals Bridge Replacement... meaning of 23 U.S.C. 139(l)(1). The actions relate to the Goethals Bridge Replacement Project located...

  13. Stability of Cylindrical and Conical Shells of Circular Cross Section, with Simultaneous Action of Axial Compression and External Normal Pressure

    NASA Technical Reports Server (NTRS)

    Mushtari, K. M.; Sachenkov, A. V.

    1958-01-01

    We consider in this report the determination of the upper limit of critical loads in the case of simultaneous action of a compressive force, uniformly distributed over plane cross sections, and of isotropic external normal pressure on cylindrical or conical shells of circular cross section. As a starting point we use the differential equations for neutral equilibrium of conical shells which have been used for the solution of the problem of stability of conical shells under torsion and under axial compression; upon solution of the problem it is possible to satisfy all boundary conditions, in contrast to the report where no attention is paid to the fulfillment of the boundary conditions, and to the report where only part of the boundary conditions are satisfied by solution of the problem according to Galerkin's method. Approximate formulas are used for the determination of the critical external normal pressure with simultaneous action of longituninal compression. Let us note that the formulas suggested in reference 5 are not well founded and may lead, in a number of cases, to a substantial mistake in the magnitude of the critical load.

  14. Reducing Uncertainties in Neutron-Induced Fission Cross Sections Using a Time Projection Chamber

    NASA Astrophysics Data System (ADS)

    Manning, Brett; Niffte Collaboration

    2015-10-01

    Neutron-induced fission cross sections for actinides have long been of great interest for nuclear energy and stockpile stewardship. Traditionally, measurements were performed using fission chambers which provided limited information about the detected fission events. For the case of 239Pu(n,f), sensitivity studies have shown a need for more precise measurements. Recently the Neutron Induced Fission Fragment Tracking Experiment (NIFFTE) has developed the fission Time Projection Chamber (fissionTPC) to measure fission cross sections to better than 1% uncertainty by providing 3D tracking of fission fragments. The fissionTPC collected data to calculate the 239Pu(n,f) cross section at the Weapons Neutron Research facility at the Los Alamos Neutron Science Center during the 2014 run cycle. Preliminary analysis has been focused on studying particle identification and target and beam non-uniformities to reduce the uncertainty on the cross section. Additionally, the collaboration is investigating other systematic errors that could not be well studied with a traditional fission chamber. LA-UR-15-24906.

  15. Reducing Uncertainties in Neutron Induced Fission Cross Sections via a Time Projection Chamber

    NASA Astrophysics Data System (ADS)

    Magee, Joshua; Niffte Collaboration

    2016-09-01

    Neutron induced fission cross sections of actinides are of great interest in nuclear energy and stockpile stewardship. Traditionally, measurements of these cross sections have been made with fission chambers, which provide limited information on the actual fragments, and ultimately result in uncertainties on the order of several percent. The Neutron Induced Fission Fragment Tracking Experiment collaboration (NIFFTE) designed and built a fission Time Project Chamber (fission TPC), which provides additional information on these processes, through 3-dimensional tracking, improved particle identification, and in-situ profiles of target and beam non-uniformities. Ultimately, this should provide sub-percent measurements of (n,f) cross-sections. During the 2015 run cycle, measurements of several actinides were performed at the Los Alamos Neutron Science Center (LANSCE) Weapons Neutron Research (WNR) facility. An overview of the fission TPC will be given, as well as the current progress towards a sub-percent measurement of the 239Pu/235U (n,f) cross-section ratio. This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344.

  16. International concerted action on collaboration in telemedicine: G8 sub-project 4.

    PubMed

    Lacroix, A

    1999-01-01

    The main objective of G-7/8 Global Healthcare Applications sub-project 4 is to enable an international concerted action on collaboration in telemedicine. To promote and facilitate the implementation of telemedicine or health telematics networks around the world, it was felt necessary to solve certain key issues. Five thematic solution-seeking FORUMS are each addressing a specific item. The first FORUM held in Montréal, Canada on May 28-30 1998 focussed on Interoperability of telemedicine and telehealth systems. Other FORUMS address other themes such as: Impacts of Telemedicine on health care management (Regensburg, Germany, November 21-23 1998); Evaluation and Cost Effectiveness of Telemedicine (Melbourne, Australia, February 19-20 1999); Clinical and technical quality and standards (Washington, USA, April 29-30 1999); Medico-legal aspects of national and international applications (Oxford, UK, fall 1999). The main objective of these FORUMS is to arrive at best practices through consultation amongst experts who seek together the best solutions to facilitate global international telemedicine networks. Towards this goal, G-8 sub-project-4 will also conduct the IMPACT (International Multipoint Project of Advanced Communication in Telemedicine) feasibility study which will aim at conducting multipoint exchanges between telemedicine units in the academic centers of the participating G-8 and other countries. More detailed information on this project and summaries of the initial FORUMS are found on our Web site at www.g7sp4.org.

  17. Simulated lesion, human observer performance comparison between thin-section dedicated breast CT images versus computed thick-section simulated projection images of the breast.

    PubMed

    Chen, L; Boone, J M; Abbey, C K; Hargreaves, J; Bateni, C; Lindfors, K K; Yang, K; Nosratieh, A; Hernandez, A; Gazi, P

    2015-04-21

    The objective of this study was to compare the lesion detection performance of human observers between thin-section computed tomography images of the breast, with thick-section (>40 mm) simulated projection images of the breast. Three radiologists and six physicists each executed a two alterative force choice (2AFC) study involving simulated spherical lesions placed mathematically into breast images produced on a prototype dedicated breast CT scanner. The breast image data sets from 88 patients were used to create 352 pairs of image data. Spherical lesions with diameters of 1, 2, 3, 5, and 11 mm were simulated and adaptively positioned into 3D breast CT image data sets; the native thin section (0.33 mm) images were averaged to produce images with different slice thicknesses; average section thicknesses of 0.33, 0.71, 1.5 and 2.9 mm were representative of breast CT; the average 43 mm slice thickness served to simulate simulated projection images of the breast.The percent correct of the human observer's responses were evaluated in the 2AFC experiments. Radiologists lesion detection performance was significantly (p < 0.05) better in the case of thin-section images, compared to thick section images similar to mammography, for all but the 1 mm lesion diameter lesions. For example, the average of three radiologist's performance for 3 mm diameter lesions was 92% correct for thin section breast CT images while it was 67% for the simulated projection images. A gradual reduction in observer performance was observed as the section thickness increased beyond about 1 mm. While a performance difference based on breast density was seen in both breast CT and the projection image results, the average radiologist performance using breast CT images in dense breasts outperformed the performance using simulated projection images in fatty breasts for all lesion diameters except 11 mm. The average radiologist performance outperformed that of the average physicist observer, however trends

  18. Simulated lesion, human observer performance comparison between thin-section dedicated breast CT images versus computed thick-section simulated projection images of the breast

    NASA Astrophysics Data System (ADS)

    Chen, L.; Boone, J. M.; Abbey, C. K.; Hargreaves, J.; Bateni, C.; Lindfors, K. K.; Yang, K.; Nosratieh, A.; Hernandez, A.; Gazi, P.

    2015-04-01

    The objective of this study was to compare the lesion detection performance of human observers between thin-section computed tomography images of the breast, with thick-section (>40 mm) simulated projection images of the breast. Three radiologists and six physicists each executed a two alterative force choice (2AFC) study involving simulated spherical lesions placed mathematically into breast images produced on a prototype dedicated breast CT scanner. The breast image data sets from 88 patients were used to create 352 pairs of image data. Spherical lesions with diameters of 1, 2, 3, 5, and 11 mm were simulated and adaptively positioned into 3D breast CT image data sets; the native thin section (0.33 mm) images were averaged to produce images with different slice thicknesses; average section thicknesses of 0.33, 0.71, 1.5 and 2.9 mm were representative of breast CT; the average 43 mm slice thickness served to simulate simulated projection images of the breast. The percent correct of the human observer’s responses were evaluated in the 2AFC experiments. Radiologists lesion detection performance was significantly (p < 0.05) better in the case of thin-section images, compared to thick section images similar to mammography, for all but the 1 mm lesion diameter lesions. For example, the average of three radiologist’s performance for 3 mm diameter lesions was 92% correct for thin section breast CT images while it was 67% for the simulated projection images. A gradual reduction in observer performance was observed as the section thickness increased beyond about 1 mm. While a performance difference based on breast density was seen in both breast CT and the projection image results, the average radiologist performance using breast CT images in dense breasts outperformed the performance using simulated projection images in fatty breasts for all lesion diameters except 11 mm. The average radiologist performance outperformed that of the average physicist

  19. Science in Action: How Middle School Students Are Changing Their World through STEM Service-Learning Projects

    ERIC Educational Resources Information Center

    Newman, Jane L.; Dantzler, John; Coleman, April N.

    2015-01-01

    The purpose of Science in Action (SIA) was to examine the relationship between implementing quality science, technology, engineering, and math (STEM) service-learning (SL) projects and the effect on students' academic engagement in middle school science, civic responsibility, and resilience to at-risk behaviors. The innovative project funded by…

  20. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    SciTech Connect

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  1. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995

    SciTech Connect

    1995-12-01

    This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  2. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1

    SciTech Connect

    Findlay, Rick

    2006-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.

  3. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    SciTech Connect

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE.

  4. 31 CFR 30.13 - Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Q-13: What actions are necessary for... compensation requirement)? 30.13 Section 30.13 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.13 Q-13: What actions are...

  5. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    SciTech Connect

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  6. 75 FR 8348 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ...) foreign manufactured wind turbine for the DeLauri Pump Station Renewable Energy Project in Charlestown... proposed DeLauri Pump Station Renewable Energy Project in Charlestown, MA. Section 1605 of the ARRA requires that none of the appropriated funds may be used for the construction, alteration, maintenance,...

  7. 75 FR 27808 - Section 8 Housing Choice Voucher Program-Demonstration Project of Small Area Fair Market Rents in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... the Housing Choice Voucher (HCV) program, to determine initial renewal rents for some expiring project... small area FMRs for the HCV program within certain metropolitan areas, and requests comments on several... calculated for the Demonstration projects will be used only in the Section 8 HCV program and will not...

  8. Inconsistencies in findings from the early lung cancer action project studies of lung cancer screening.

    PubMed

    Bach, Peter B

    2011-07-06

    Long-standing guidelines against screening high-risk individuals for lung cancer may change following the publication of the randomized National Lung Screening Trial (NLST), which shows a benefit of computed tomography compared with chest x-ray screening. Guideline panels will likely also seek additional information from nonrandomized studies of computed tomography screening, such as the Early Lung Cancer Action Project (ELCAP). However, for the ELCAP findings to be incorporated into new guidelines, some inconsistencies in the published data should first be resolved. Specifically, some of the reports from ELCAP appear to contradict others in terms of important endpoints, and several findings from ELCAP appear to be statistically improbable or outliers when compared with analyses and studies by other research groups. Clarification of both internal and external inconsistencies is a prerequisite for evaluation of the body of work published by ELCAP investigators.

  9. 75 FR 8347 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... by HD Supply in Charlotte, NC, are manufactured in India and Sri Lanka, and meet Mecklenburg County's... INFORMATION CONTACT: Cynthia Y. Edwards, Project Officer, Grants and SRF Section, Water Protection Division..., for the purchase of coconut fiber woven mats manufactured in India and Sri Lanka. Section 1605 of...

  10. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    SciTech Connect

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE`s satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson.

  11. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    SciTech Connect

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete.

  12. Towards a Reflection Repertoire: Using a Thinking Tool to Understand Tensions in an Action Research Project

    ERIC Educational Resources Information Center

    Aas, Marit

    2014-01-01

    Most action researchers agree that action research consists of cycles of planning, acting, reflecting, and taking further action. However, in action research literature, there is something missing. The nature of reflection in the action research process, including its relationship with the tensions that arise while discussing purposes, processes,…

  13. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... failure of remedial actions taken pursuant to CERCLA section 122. 307.42 Section 307.42 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA)...

  14. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... failure of remedial actions taken pursuant to CERCLA section 122. 307.42 Section 307.42 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA)...

  15. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... failure of remedial actions taken pursuant to CERCLA section 122. 307.42 Section 307.42 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA)...

  16. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... failure of remedial actions taken pursuant to CERCLA section 122. 307.42 Section 307.42 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA)...

  17. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... failure of remedial actions taken pursuant to CERCLA section 122. 307.42 Section 307.42 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA)...

  18. 31 CFR 30.12 - Q-12: What actions are necessary for a TARP recipient to comply with section 111(d) of EESA (the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... a TARP recipient to comply with section 111(d) of EESA (the excessive or luxury expenditures policy requirement)? 30.12 Section 30.12 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.12 Q-12: What actions are necessary for a...

  19. 31 CFR 30.12 - Q-12: What actions are necessary for a TARP recipient to comply with section 111(d) of EESA (the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... a TARP recipient to comply with section 111(d) of EESA (the excessive or luxury expenditures policy requirement)? 30.12 Section 30.12 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.12 Q-12: What actions are necessary for a...

  20. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... a TARP recipient to comply with section 111(b)(3)(D) of EESA (the limitations on bonus payments)? 30.10 Section 30.10 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.10 Q-10: What actions are necessary for a...

  1. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a TARP recipient to comply with section 111(b)(3)(D) of EESA (the limitations on bonus payments)? 30.10 Section 30.10 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.10 Q-10: What actions are necessary for a...

  2. 31 CFR 30.13 - Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on executive... Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.13 Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on...

  3. 31 CFR 30.13 - Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on executive... Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.13 Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on...

  4. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... a TARP recipient to comply with section 111(b)(3)(D) of EESA (the limitations on bonus payments)? 30.10 Section 30.10 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.10 Q-10: What actions are necessary for a...

  5. 31 CFR 30.12 - Q-12: What actions are necessary for a TARP recipient to comply with section 111(d) of EESA (the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a TARP recipient to comply with section 111(d) of EESA (the excessive or luxury expenditures policy requirement)? 30.12 Section 30.12 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.12 Q-12: What actions are necessary for a...

  6. 31 CFR 30.13 - Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on executive... Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.13 Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on...

  7. 31 CFR 30.13 - Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on executive... Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.13 Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on...

  8. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada, Rev. No.: 0

    SciTech Connect

    Rick Findlay

    2006-09-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation.

  9. Bentonite-amended soil special study. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1989-12-01

    This special study was conducted to assess the viability of soil with a high percentage of bentonite added as an infiltration barrier in the cover of Uranium Mill Tailings Remedial Action (UMTRA) Project disposal cells. To achieve maximum concentration limits (MCLs) at several UMTRA Project sites, covers with a very low permeability are needed. If alternate concentration limits (ACLs) are the appropriate site groundwater compliance strategy, the US Department of Energy (DOE) is required to demonstrate, among other things, that the infiltration to the disposal cell is as low as reasonably achievable, and hence that the cover has a very low permeability. When the study discussed here was begun, the lowest permeability element available was CLAYMAX[sub R], a manufactured liner material constructed of natural material (bentonite clay) between two geosynthetics.The strength of soil-bentonite mixes was measured to see if they could be placed on sideslopes and not pose stability problems. Also evaluated were the hydraulic conductivities of soil-bentonite mixes. If the strengths and permeabilities of soils with a high percentage of bentonite are favorable, the soils may be used as infiltration barriers in current cover designs without changing pile geometries. The scope of work for this study called for a literature review and a two-phased laboratory testing program. This report presents the results of the literature review and the first phase of the testing program.

  10. Reactor building temperature reduction project data acquisition, evaluations and proposed actions. Arkansas nuclear one, Unit 1

    SciTech Connect

    France, E.R.

    1991-06-01

    On August 1, 1987 Arkansas Power and Light maintenance personnel made a power entry at Arkansas Nuclear One, Unit 1. They discovered that the steam generator cavity temperature was too high for personnel comfort. AP and L management requested that the available temperature data be recorded throughout the reactor building (RB). Hand held thermometers, infrared thermography, and existing RTD`s were utilized. Temperatures were found to range from 100F near the basement to 165F in the dome area. A temperature of 183F was found above the A steam generator cavity. As a result of this finding, AP and L and the Nuclear Regulatory Commission decided that an in depth evaluation of the RB temperatures and their effect on the safe operation of the plant was needed. The original design temperature was 110F. This section discusses the monitoring systems installed, the results of the evaluation and the corrective actions taken.

  11. The Impact of a Dual-Project Action Learning Program: A Case of a Large IT Manufacturing Company in South Korea

    ERIC Educational Resources Information Center

    Yoon, Hyung Joon; Cho, Yonjoo; Bong, Hyeon-Cheol

    2012-01-01

    The primary purpose of this article is to evaluate the impact of a dual-project action learning program (DPALP) conducted in South Korea. A dual-project program requires each participant to carry out both team and individual projects. Cho and Egan's [2009. Action learning research: A systematic review and conceptual framework. "Human Resource…

  12. 75 FR 6387 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... Troy, Vermont (``Town'') for the purchase of foreign manufactured butterfly valves and actuators for an... that there are currently no domestic manufactured butterfly valves and actuators available to meet its... exception to Section 1605 of ARRA. This action permits the purchase of foreign manufactured butterfly...

  13. 76 FR 18757 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... of a foreign manufactured wind turbine generator that meets the Authority's design and performance... engineer, EPA has concluded that there are currently no domestic manufactured wind turbines available in... exception to Section 1605(a) of ARRA. This action permits the purchase of foreign manufactured wind...

  14. Give Water a Hand. School Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation at a school site, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  15. Nurse-led action research project for expanding nurses’ role in patient education in Iran: Process, structure, and outcomes

    PubMed Central

    Khorasani, Parvaneh; Rassouli, Maryam; Parvizy, Soroor; Zagheri-Tafreshi, Mansoureh; Nasr-Esfahani, Mahmood

    2015-01-01

    Background: Patient education is among the lowest met need of patients in Iran; therefore, expansion of that role can result in greater professional accountability. This study aimed to explain the practical science of the process, structure, and outcomes of a nurse-led action research project to expand the nurses’ role in patient education in Iran. Materials and Methods: This study was part of a participatory action research. Daily communications and monthly joint meetings were held from January 2012 to February 2014 for planning and management. These were based on the research protocol, and the conceptual framework included the Mobilizing for Action through Planning and Partnerships process by means of Leadership for Change skills. Data were produced and gathered through participant observations. Administrative data included project records, official documents, artifacts, news, and reports, which were analyzed through qualitative content analysis. Results: A participatory project was established with three groups of participants organized from both academic and clinical fields. These consisted of a “core research support team,” “two steering committees,” and community representatives of clients and professionals as “feedback groups.” A seven-stage process, named the “Nurse Educators: Al-Zahra Role Expansion Action Research” (NEAREAR) process, resulted from the project, in which strategic issues were gradually developed and implemented through 32 action plans and quality improvement cycles of action research. Audits and supervision evaluations showed meaningful changes in capacity building components. Conclusions: A nurse-led ad hoc structure with academic–clinical partnerships and strategic management process was suggested as a possible practical model for expanding nurses’ educational role in similar contexts. Implications and practical science introduced in this action research could also be applicable for top managers and health system

  16. 2012 Groundwater Monitoring Report Project Shoal Area Subsurface Corrective Action Unit 447

    SciTech Connect

    2013-03-01

    The Project Shoal Area (PSA) in Nevada was the site of a 12-kiloton underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. Analytical results from the 2012 monitoring are consistent with those of the previous years, with tritium detected only in well HC-4. The tritium concentration in groundwater from well HC-4 remains far below the U.S. Environmental Protection Agency-established maximum contaminant level of 20,000 picocuries per liter. Concentrations of total uranium and gross alpha were also detected during this monitoring period, with uranium accounting for nearly all the gross alpha activity. The total uranium concentrations obtained from this monitoring period were consistent with previous results and reflect a slightly elevated natural uranium concentration, consistent with the mineralized geologic terrain. Isotopic ratios of uranium also indicate a natural source of uranium in groundwater, as opposed to a nuclear-test-related source. Water level trends obtained from the 2012 water level data were consistent with those of previous years. The corrective action strategy for the PSA is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the current monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. While water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an

  17. Weldon Spring Site environmental report for calendar year 1993. Weldon Springs Site Remedial Action Project

    SciTech Connect

    Not Available

    1994-05-01

    This Site Environmental Report for Calendar Year 1993 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels, and to summarize trends and/or changes in contaminant concentrations from environmental monitoring program. In 1993, the maximum committed dose to a hypothetical individual at the chemical plant site perimeter was 0.03 mrem (0.0003 mSv). The maximum committed dose to a hypothetical individual at the boundary of the Weldon Spring Quarry was 1.9 mrem (0.019 mSv). These scenarios assume an individual walking along the perimeter of the site-once a day at the chemical plant/raffinate pits and twice a day at the quarry-250 days per year. This hypothetical individual also consumes fish, sediment, and water from lakes and other bodies of water in the area. The collective dose, based on an effected population of 112,000 was 0.12 person-rem (0.0012 person-Sv). This calculation is based on recreational use of the August A. Busch Memorial Conservation Area and the Missouri Department of Conservation recreational trail (the Katy Trail) near the quarry. These estimates are below the U.S. Department of Energy requirement of 100 mrem (I mSv) annual committed effective dose equivalent for all exposure pathways. Results from air monitoring for the National Emission Standards for Hazardous Air Pollutants (NESHAPs) program indicated that the estimated dose was 0.38 mrem, which is below the U.S. Environmental Protection Agency (EPA) standard of 10 mrem per year.

  18. "What Happened to Our Sense of Justice?" Tracing Agency and Critical Engagement in a Youth Participatory Action Research Project

    ERIC Educational Resources Information Center

    Giraldo-García, Regina J.; Galletta, Anne

    2015-01-01

    Tracing the nature of critical engagement and agency among youth in a participatory action research (PAR) collective, the study attends to the manner in which critical engagement and agency developed over time for the youth researchers. The focus of the project was to conduct a survey among ninth grade students concerning their early high school…

  19. A Synthesis and Application Teaching Approach for Group Projects in an Undergraduate Business Course: An Action Research Study

    ERIC Educational Resources Information Center

    Green, Laurena E.

    2009-01-01

    Scholars proposed it would be possible to enhance group effectiveness and functioning if people could develop a better appreciation of the processes surrounding group development (M. K. Smith, 2005). The action research study explored the facilitation of a synthesis and application teaching approach for group projects in the practice of two…

  20. Collaborative Action Research as a Tool for Generating Formative Feedback on Teachers' Classroom Assessment Practice: The KREST Project

    ERIC Educational Resources Information Center

    Harrison, Christine

    2013-01-01

    This paper sets out to explore science teachers' classroom assessment practices and outlines some of the tensions and synergies in changing assessment practices. It describes episodes from a collaborative action research project with science teachers designed to support the strengthening of classroom assessment practices--the King's Researching…

  1. An Action Research Project to Determine the Utility of Bully Prevention in Positive Behavior Support for Elementary School Bullying Prevention

    ERIC Educational Resources Information Center

    Goodman-Scott, Emily; Doyle, Beth; Brott, Pamelia

    2014-01-01

    A trio of researchers presents a case study from a practical, participatory action research project to demonstrate how one school district implemented a school-wide bullying prevention initiative for all elementary schools based on Bully Prevention in Positive Behavior Support (BP-PBS). The purpose of this manuscript is to discuss the process of…

  2. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    SciTech Connect

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state`s 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs.

  3. Collaborative Action Research and Project Work: Promising Practices for Developing Collaborative Inquiry among Early Childhood Preservice Teachers

    ERIC Educational Resources Information Center

    Moran, Mary Jane

    2007-01-01

    Excerpts from case studies of two preservice teaching teams exemplify a new approach for merging research and practice within an introductory early childhood methods course. Through participation in cycles of collaborative action research focused on the joint task of implementing long-term projects, preservice teachers evidenced change in the ways…

  4. 77 FR 66215 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York Correction In notice document 2012-26799, appearing on page 65929 in the...

  5. 78 FR 26104 - Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Federal Highway Administration Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson County, OR AGENCY: Federal Highway Administration (FHWA), Department of..., Program Development Team Leader, Federal Highway Administration, 530 Center Street NE., Suite 420,...

  6. From Idea to Action: Promoting Responsible Management Education through a Semester-Long Academic Integrity Learning Project

    ERIC Educational Resources Information Center

    Lavine, Marc H.; Roussin, Christopher J.

    2012-01-01

    The authors describe a semester-long action-learning project where undergraduate or graduate management students learn about ethics, responsibility, and organizational behavior by examining the policy of their college or university that addresses academic integrity. Working in teams, students adopt a stakeholder management approach as they make…

  7. Democratic Deliberations in the Finnish Elementary Classroom: The Dilemmas of Deliberations and the Teacher's Role in an Action Research Project

    ERIC Educational Resources Information Center

    Tammi, Tuure

    2013-01-01

    Finnish youth are found to be, despite their broad knowledge, uninterested in politics and in societal participation. As a remedy, international studies suggest enabling democratic experiences in schools. This article discusses an action research project aimed at developing deliberation-based democratic practice in an elementary classroom. Results…

  8. Making Space for Democracy through Assessment and Feedback in Higher Education: Thoughts from an Action Research Project in Education Studies

    ERIC Educational Resources Information Center

    McDonnell, Jane; Curtis, Will

    2014-01-01

    This paper reports on an action research project into the development of a "democratic feedback model" with students on an education studies programme at a post-1992 university in the UK. Building on work that has explored the dialogic dimensions of assessment and feedback, the research explored the potential for more…

  9. Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the ..Section..1603 Treasury Grant Program

    SciTech Connect

    Steinberg, D.; Porro, G.; Goldberg, M.

    2012-04-01

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the Section 1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the Section 1603 grant program.

  10. Quality Assurance Program Plan for the radiological survey activities program --- Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    Knott, R.R.; Little, C.A.

    1991-08-01

    The Pollutant Assessments Group (PAG) at the Grand Junction Office (GJO), Colorado, of Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude these sites from UMTRAP based on whether the on-site residual radioactive material (if any) originated from the former mill sites, and radiation levels on-site are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the Quality Assurance Plan (QAP) for the PAG in conducting all activities related to UMTRAP. All quality assurance provisions given by the DOE, DOE/UMTRA and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the PAG/UMTRA QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups. 11 refs., 6 figs., 3 tabs.

  11. Community based needs assessment in an urban area; A participatory action research project

    PubMed Central

    2012-01-01

    Background Community assessment is a core function of public health. In such assessments, a commitment to community participation and empowerment is at the heart of the WHO European Healthy Cities Network, reflecting its origins in health for all and the Ottawa Charter for Health Promotion. This study employs a participation and empowerment plan in order to conduct community assessment. Methods The method of participatory action research (PAR) was used. The study was carried out in an area of high socio-economic deprivation in Ardabil, a city in the northwest of Iran, which is currently served by a branch of the Social Development Center (SDC). The steering committee of the project was formed by some university faculty members, health officials and delegates form Farhikhteh non-governmental organization and representatives from twelve blocks or districts of the community. Then, the representatives were trained and then conducted focus groups in their block. The focus group findings informed the development of the questionnaire. About six hundred households were surveyed and study questionnaires were completed either during face-to-face interviews by the research team (in case of illiteracy) or via self-completion. The primary question for the residents was: 'what is the most important health problem in your community? Each health problem identified by the community was weighted based on the frequency it was selected on the survey, and steering committee perception of the problem's seriousness, urgency, solvability, and financial load. Results The main problems of the area appeared to be the asphalt problem, lack of easy access to medical centers, addiction among relatives and unemployment of youth. High participation rates of community members in the steering committee and survey suggest that the PAR approach was greatly appreciated by the community and that problems identified through this research truly reflect community opinion. Conclusions Participatory action

  12. 75 FR 25244 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Lower Little Miami River Wastewater Treatment Plant. This is a project-specific waiver and only applies... Wastewater Treatment Plant that may otherwise be prohibited under Section 1605(a) of the ARRA. DATES... percent. These manufactured goods will provide wastewater effluent disinfection for Warren County's...

  13. 75 FR 67966 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... Section 1605 (Buy American Requirement) of the American Recovery and Reinvestment Act of 2009 (ARRA) to... Regional Administrator of EPA Region 6 is hereby granting a project waiver of the Buy American requirements... Administrator of the EPA's Office of Administration and Resources Management has concurred on this decision...

  14. 76 FR 6786 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... properly. The valves are manufactured by 3D Valve, a Chinese company with a U.S. branch operated for sales... 3D Valve, for the proposed project being implemented by Hernando County Florida. DATES: Effective..., for the purchase of wafer swing check valves, manufactured by 3D Valve of China. Section 1605 of...

  15. 76 FR 38163 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... AGENCY Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery and... St. Paul, Minnesota, for the purchase of four combination air release/vacuum valves (ARVs) to prevent... goods will prevent failure or blockage of the South St. Paul Forcemain pressure pipe. MCES started...

  16. Project CABE 1986-1987: O.E.A. Evaluation Section Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Bilingual Education.

    The report describes first-year activities of Project CABE (Content-Area Bilingual Education) which aims to improve instruction and increase parental involvement for limited-English-proficient Spanish-speaking students with handicapping conditions in grades 4 through 9. During its first year the project served 308 students attending 25 public…

  17. PREFACE TO SPECIAL SECTION: SOUTHERN OXIDANTS STUDY 1999 ATLANTA SUPERSITE PROJECT (SOS3)

    EPA Science Inventory

    The Atlanta Supersites Project consisted of a one-month intensive field program to compare advanced methods for measurement of PM2.5 mass, chemical composition, including single particle composition in real-time, and aerosol precursor species. The project was the first of EPA's ...

  18. Project Recurso, 1988-89. Evaluation Section Report [and] Executive Summary. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Lista, Carlos A.

    Project Recurso, funded through Title VII of the Elementary and Secondary Education Act, was implemented at 12 elementary schools under the aegis of the Office of Bilingual Services, Division of Special Education of the New York City Board of Education. The project provided instructional services to 321 special education Spanish-speaking students…

  19. What Does It Mean to Be a Friendly Outsider? Critical Reflection on Finding a Role as an Action Researcher with Communities Developing Renewable Energy Projects

    ERIC Educational Resources Information Center

    Rogers, Jennifer; Convery, Ian; Simmons, Eunice; Weatherall, Andrew

    2012-01-01

    This paper is a reflective account exploring the value of using action research in a relatively new context in the United Kingdom; the development of community renewable-energy projects. There is a strong rationale for using action research in this setting due to the synergies between the principles and practice of action research and localised…

  20. Colorado economic impact study on the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    SciTech Connect

    Not Available

    1993-11-12

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1993. To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are: Direct employment was estimated at 894 workers; An estimated 89 percent of all direct employment was local; Secondary employment resulting from remedial action at the active Colorado UMTRA Project sites and the Grand Junction vicinity property program is estimated at 546 workers. Total employment (direct and secondary) is estimated at 1440 workers for the period of study (July 1, 1992, to June 30, 1993). An estimated $24.1 million was paid in wages to UMTRA workers in Colorado during FY1993; Direct and secondary wage earnings were estimated at $39.9 million; Income tax payments to the state of Colorado were estimated at $843,400 during FY1993; The gross economic impact of UMTRA Project activities in the state of Colorado is estimated at $70 million during the 1-year study period; and the net economic benefit to the state of Colorado was estimated at $57.5 million, or $5.90 per dollar of funding provided by Colorado. This figure includes both direct and secondary benefits but does not include the impact of alternative uses of the state funding.

  1. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    SciTech Connect

    Not Available

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work.

  2. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  3. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  4. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  5. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  6. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  7. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.

  8. 75 FR 39561 - Administrative Guidelines; Subsidy Layering Reviews for Proposed Section 8 Project-Based Voucher...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... Uses Statement (Sample Format) SOURCES Debt Sources Mortgage-- Loans-- Other Loans (specify)-- Other..., Section 8 Financial Management Division, and should be answered prior to an HCA's notification to HUD of..., regulatory and Guideline requirements. Such letters should be forwarded via e-mail to the Section 8...

  9. Using a Time Projection Chamber to Measure High Precision Neutron-Induced Fission Cross Sections

    SciTech Connect

    Manning, Brett

    2015-08-06

    2014 LANSCE run cycle data will provide a preliminary 239Pu(n,f) cross section and will quantify uncertainties: PID and Target/beam non-uniformities. Continued running during the 2015 LANSCE run cycle: Thin targets to see both fission fragments and 239Pu(n,f) cross section and fully quantified uncertainties

  10. Preliminary results of BRAVO project: brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks.

    PubMed

    Bergamasco, Massimo; Frisoli, Antonio; Fontana, Marco; Loconsole, Claudio; Leonardis, Daniele; Troncossi, Marco; Foumashi, Mohammad Mozaffari; Parenti-Castelli, Vincenzo

    2011-01-01

    This paper presents the preliminary results of the project BRAVO (Brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks). The objective of this project is to define a new approach to the development of assistive and rehabilitative robots for motor impaired users to perform complex visuomotor tasks that require a sequence of reaches, grasps and manipulations of objects. BRAVO aims at developing new robotic interfaces and HW/SW architectures for rehabilitation and regain/restoration of motor function in patients with upper limb sensorimotor impairment through extensive rehabilitation therapy and active assistance in the execution of Activities of Daily Living. The final system developed within this project will include a robotic arm exoskeleton and a hand orthosis that will be integrated together for providing force assistance. The main novelty that BRAVO introduces is the control of the robotic assistive device through the active prediction of intention/action. The system will actually integrate the information about the movement carried out by the user with a prediction of the performed action through an interpretation of current gaze of the user (measured through eye-tracking), brain activation (measured through BCI) and force sensor measurements.

  11. The Benefits and Challenges of Enterprise Education: Results from an Action Research Project in the Third Grade in Finnish Basic Education

    ERIC Educational Resources Information Center

    Elo, Janne

    2016-01-01

    This article is the result of an action research project conducted in 2014 in a primary school in the city of Vaasa in Finland. The project focused on developing the practice of integrating enterprise education as a part of everyday teaching in Grade Three. The project involved three class teachers, the headmaster and a university researcher. This…

  12. Wide-field optical sectioning for live-tissue imaging by plane-projection multiphoton microscopy

    NASA Astrophysics Data System (ADS)

    Yu, Jiun-Yann; Kuo, Chun-Hung; Holland, Daniel B.; Chen, Yenyu; Ouyang, Mingxing; Blake, Geoffrey A.; Zadoyan, Ruben; Guo, Chin-Lin

    2011-11-01

    Optical sectioning provides three-dimensional (3D) information in biological tissues. However, most imaging techniques implemented with optical sectioning are either slow or deleterious to live tissues. Here, we present a simple design for wide-field multiphoton microscopy, which provides optical sectioning at a reasonable frame rate and with a biocompatible laser dosage. The underlying mechanism of optical sectioning is diffuser-based temporal focusing. Axial resolution comparable to confocal microscopy is theoretically derived and experimentally demonstrated. To achieve a reasonable frame rate without increasing the laser power, a low-repetition-rate ultrafast laser amplifier was used in our setup. A frame rate comparable to that of epifluorescence microscopy was demonstrated in the 3D imaging of fluorescent protein expressed in live epithelial cell clusters. In this report, our design displays the potential to be widely used for video-rate live-tissue and embryo imaging with axial resolution comparable to laser scanning microscopy.

  13. Detailed Project Report and Environmental Assessment. Section 111. Shores East of Diked Disposal Area, Lorain Harbor, Ohio.

    DTIC Science & Technology

    1981-11-01

    land acquisition plan was made to refine the real estate values which would be the primary cost associated with that plan. So the basis for...The resultant refinement of costs, when combining 2 NCBPD-EB SUBJECT: Section III Detailed Project Report and Environmental Assessment for Shores East...rough estimates and further study will result in refinement of these figures. Question: What will happen after the study is completed in August? Answer

  14. Perspectives from Ethiopia regarding U.S. military humanitarian assistance: how to build a better medical civil action project (MEDCAP).

    PubMed

    Miles, Shana; Malone, Joseph L

    2013-12-01

    Assuming that budgetary constraints continue over the next several years, the U.S. military's overseas medical activities including medical civic action projects (MEDCAPs) and humanitarian assistance projects could comprise an increasing proportion of the contributions of U.S. government (USG) to improving global health. We have identified several issues with MEDCAPs in Ethiopia since 2009 that resulted in delays or project cancellations. These were mostly related to lack of a plan to develop sustainable capacities. Although there are many obvious medical needs for civilian populations in Ethiopia, the provision of sustainable development assistance involving these Ethiopian populations on behalf of the USG is a complex undertaking involving coordination with many partners and coordination with several other USG agencies. Military medical professionals planning MEDCAPs and other cooperative global health projects would benefit from consultation and close coordination with U.S. Centers for Disease Control and Prevention (CDC) and U.S. Agency of International Development (USAID) experts who are involved in supporting medium- and long-term health projects in Ethiopia. The establishment of durable military medical academic relationships and involvement of overseas military medical research units could also help promote sustainable projects and build robust professional relationships in global health.

  15. Bilingual Academic Computer and Technology Oriented Program: Project COM-TECH. Evaluation Section Report. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Plotkin, Donna

    Project COM-TECH offered bilingual individualized instruction, using an enrichment approach, to Spanish- and Haitian Creole-speaking students with varying levels of English and native language proficiency and academic preparation. The program provided supplementary instruction in English as a Second Language (ESL); Native Language Arts (NLA); and…

  16. The LXCat project: Electron scattering cross sections and swarm parameters for low temperature plasma modeling

    NASA Astrophysics Data System (ADS)

    Pancheshnyi, S.; Biagi, S.; Bordage, M. C.; Hagelaar, G. J. M.; Morgan, W. L.; Phelps, A. V.; Pitchford, L. C.

    2012-04-01

    LXCat is a dynamic, open-access, website for collecting, displaying, and downloading ELECtron SCATtering cross sections and swarm parameters (mobility, diffusion coefficient, reaction rates, etc.) required for modeling low temperature, non-equilibrium plasmas. Contributors set up individual databases, and the available databases, indicated by the contributor's chosen title, include mainly complete sets of electron-neutral scattering cross sections, although the option for introducing partial sets of cross sections exists. A database for measured swarm parameters is also part of LXCat, and this is a growing activity. On-line tools include options for browsing, plotting, and downloading cross section data. The electron energy distribution functions (edfs) in low temperature plasmas are in general non-Maxwellian, and LXCat provides an option for execution of an on-line Boltzmann equation solver to calculate the edf in homogeneous electric fields. Thus, the user can obtain electron transport and rate coefficients (averages over the edfs) in pure gases or gas mixtures over a range of values of the reduced electric fields strength, E/N, the ratio of the electric field strength to the neutral density, using cross sections from the available databases. New contributors are welcome and anyone wishing to create a database and upload data can request a username and password. LXCat is part of a larger, community-wide effort aimed at collecting, evaluating, and sharing data relevant to modeling low temperature plasmas. To illustrate the utility of LXCat in this context, we compare electron swarm parameters in argon calculated using the different compilations of cross sections presently available on LXCat. These compilations include quite different groupings of excited states, yet lead to swarm parameters in good agreement. LXCat is available at http://www.lxcat.laplace.univ-tlse.fr.

  17. Engaging Young Adolescents in Social Action through Photovoice: The Youth Empowerment Strategies (YES!) Project

    ERIC Educational Resources Information Center

    Wilson, Nance; Dasho, Stefan; Martin, Anna C.; Wallerstein, Nina; Wang, Caroline C.; Minkler, Meredith

    2007-01-01

    The Youth Empowerment Strategies (YES!) project is an afterschool empowerment program and research project for underserved early adolescents. Central to YES! is an empowerment intervention that provides early adolescents with opportunities for civic engagement with other youth around issues of shared concern in their schools and neighborhoods.…

  18. From Disenchantment to Dialogue and Action: The "Transforming Community" Project at Emory University

    ERIC Educational Resources Information Center

    Harris, Leslie M.; Usher, Jody

    2008-01-01

    In this article, the authors describe the "Transforming Community Project" (TCP) at Emory University. Emory University is large and dispersed: It comprises approximately 2,700 faculty, 6,400 staff members, and 12,300 students across nine academic divisions. The Transforming Community Project is oriented to both process and product. The…

  19. 77 FR 14464 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    .... Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin, Project I.D. 1060-33-01. The project involves... (FHWA- WISC-EIS-09-01-F), in the Record of Decision (ROD) issued on February 10, 2012, and in other... Amendments and Reauthorization Act of 1986 [Pub. L. 99-499]; Resource Conservation and Recovery Act [42...

  20. Civic Action Projects Report, 1 January 1965-31 December 1965. Volume 2.

    DTIC Science & Technology

    1966-06-22

    Third Military Zone. 3. LOCATION OF PROJECT. Jutiapa. 4. DESCRIPTION OF PROJECT. The military’s marimba band continues to give weekly band concerts in... marimba band and Army band provided free entertainment for the school activities in the city. Troops helped people in a slum area which burned on

  1. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    SciTech Connect

    Ewy, Ann; Hays, David

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  2. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    SciTech Connect

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  3. Tackling inequity through a Photovoice project on the social determinants of health: translating Photovoice evidence to community action.

    PubMed

    Haque, Nasim; Eng, Brian

    2011-03-01

    St. Jamestown is the most densely populated vertical immigrant-receiving urban neighbourhood in Canada. The Photovoice project engaged and empowered immigrant residents of St. Jamestown to influence public policy and secure improved local services for promoting health and well-being. Twenty-seven residents used photography and storytelling to record neighbourhood characteristics and their implications on residents' health and well-being. Eight participants presented recommendations actionable at neighbourhood level to the councillor and worked with the city to carry out the recommendations made that were recognized as important for neighbourhood residents' health and well-being. The results indicate Photovoice can be used to generate dialogue on community concerns and priorities and promote community action.

  4. Theory and action for health promotion illustrations from the North Karelia Project.

    PubMed Central

    McAlister, A; Puska, P; Salonen, J T; Tuomilehto, J; Koskela, K

    1982-01-01

    The North Karelia Project in Finland illustrates the fundamental goals of health promotion. Specific activities of the project serve as examples of how concepts from the social and behavioral sciences can be applied to achieve estimated reductions in predicted risk of disease. The results in North Karelia are not conclusive, but they are encouraging, and the investigations conducted there is an essential reference for future research in health promotion and disease prevention. PMID:7053618

  5. Short-term incubation of bovine placentome sections as a tool to study xenobiotic mechanism of action.

    PubMed

    Wojciechowska, Anna; Młynarczuk, Jarosław; Kotwica, Jan

    2015-12-01

    Studies on the effects of various factors, including xenobiotics, on the maternal-fetal connections in the placenta are restricted by the lack of a simple and inexpensive research model. We used placentomes collected at a slaughterhouse to in vitro study the bovine sections contained integral maternal-fetal connections. The placentomes from cows (n=4/experiment, 120-150 days post coitum) were cut using a razor blade into 60-80 mg sections and incubated in either DMEM/Ham's F-12 or M-199 supplemented with FCS (2%, 5% or 10%), amniotic fluid (AF or inactive AF, 10% or 20%) or both. The sections (n=4/supplement) were incubated for 24 or 48 h in a water bath at 37.5°C in an atmosphere of 5% CO2 and 95% O2. The structure and secretory activity of placentome sections were maintained when incubated in DMEM/Ham's F-12 with 2% FCS and 10% AF. M-199 was less acidified than DMEM/Ham's F-12 during incubation, and thus, this medium was better able to maintain the integrity of the placenta and the secretion of estradiol, progesterone and oxytocin for 48 h. Moreover, we detected a decrease in the expression of placenta-specific 1 (PLAC1) mRNA (an indicator of trophoblast proliferation) and an increase in the levels of keratin 8 (KRT8; a marker of normal placental barrier function) and hypoxia induced factor 1α (HIF1α; a marker of hypoxia) mRNA. These results indicate the presence of adaptation and repair mechanisms and confirm the biological activity of the placentome sections. We propose the use of placentome sections as an in vitro model to study maternal-fetal connections in cows.

  6. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    SciTech Connect

    Bachrach, A.; Hoopes, J.; Morycz, D. ); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. , Inc., Washington, DC ); Rice, G. )

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

  7. Uranium Mill Tailings Remedial Action Project (UMTRAP), Rifle, Colorado: Phase 2, Construction drawings [Engineering Materials

    SciTech Connect

    1991-05-13

    This document consists of engineering drawings related to the remedial action of the Old Rifle Processing site, the New Rifle Processing site, and the Estes Gulch disposal site. This report is intended to accompany report DOE/UMTRA--050506 volume 3, appendix F.

  8. An Action Research Project on Preparing Teachers to Meet the Needs of Underserved Student Populations

    ERIC Educational Resources Information Center

    Buck, Gayle A.; Cordes, Jeanene G.

    2005-01-01

    The focus of this action research study was on the initial stage in reforming our teacher preparation programs. We designed, conducted, evaluated, and revised the components of our teacher preparation programs that were aimed at providing preservice teachers with the confidence and knowledge needed to meet the needs of youth populations…

  9. Seeking to Improve African American Girls' Attitudes toward Science: A Participatory Action Research Project

    ERIC Educational Resources Information Center

    Buck, Gayle A.; Cook, Kristin L.; Quigley, Cassie F.; Prince, Pearl; Lucas, Yvonne

    2014-01-01

    In this participatory action research study, we answered the question, How can we improve attitudes toward science education of the African American girls at an elementary school? Girls in grades 3-6 completed the Modified Attitudes toward Science Inventory. A purposeful sample of 30 girls participated in several focus-group interviews throughout…

  10. Complementary Contributions of Striatal Projection Pathways to Action Initiation and Execution.

    PubMed

    Tecuapetla, Fatuel; Jin, Xin; Lima, Susana Q; Costa, Rui M

    2016-07-28

    The performance of an action relies on the initiation and execution of appropriate movement sequences. Two basal ganglia pathways have been classically hypothesized to regulate this process via opposing roles in movement facilitation and suppression. By using a series of state-dependent optogenetic manipulations, we dissected the contributions of each pathway and found that both the direct striatonigral pathway and the indirect striatopallidal pathway are necessary for smooth initiation and the execution of learned action sequences. Optogenetic inhibition or stimulation of each pathway before sequence initiation increased the latency for initiation: manipulations of the striatonigral pathway activity slowed action initiation, and those of the striatopallidal pathway aborted action initiation. The inhibition of each pathway after initiation also impaired ongoing execution. Furthermore, the subtle activation of striatonigral neurons sustained the performance of learned sequences, while striatopallidal manipulations aborted ongoing performance. These results suggest a supportive versus permissive model, where patterns of coordinated activity, rather than the relative amount of activity in these pathways, regulate movement initiation and execution.

  11. In Our Hands: A Multi-Site Parent-Teacher Action Research Project. Report No. 30.

    ERIC Educational Resources Information Center

    Palanki, Ameetha; Burch, Patricia

    This report describes the efforts of eight elementary and middle schools in seven states to involve families and communities in ways that have significant impact on students' learning. Through a process called Parent-Teacher Action Research (PTAR), teams of parents and teachers, principals, and facilitators at each school closely examined their…

  12. Evaluation of a Multi-Case Participatory Action Research Project: The Case of SOLINSA

    ERIC Educational Resources Information Center

    Home, Robert; Rump, Niels

    2015-01-01

    Purpose: Scholars agree that evaluation of participatory action research is inherently valuable; however there have been few attempts at evaluating across methods and across interventions because the perceived success of a method is affected by context, researcher skills and the aims of the participants. This paper describes the systematic…

  13. Lessons from the Field: Participatory Action Research in a Family Research Project.

    ERIC Educational Resources Information Center

    Robison, Dorothy; Krauss, Marty Wyngaarden

    2003-01-01

    This paper describes development of a study that includes participatory action research, specifically the establishment of a family advisory committee. The study involved a survey of Massachusetts families of children with disabilities. Suggestions for establishing and integrating the committee into the research enterprise are offered, as are…

  14. Effects of a Long-Term Participatory Action Research Project on Science Teachers' Professional Development

    ERIC Educational Resources Information Center

    Eilks, Ingo; Markic, Silvija

    2011-01-01

    This paper describes the potential of long-term co-operation between science educators and science teachers concerning the teachers' continuous professional development, based on Participatory Action Research in science education. The discussion is based on a six-year case study observing a group of about ten German chemistry teachers by chemistry…

  15. Locating Community Action Outreach Projects in the Scholarship of Media Literacy Pedagogy

    ERIC Educational Resources Information Center

    Crandall, Heather

    2016-01-01

    This paper compares frameworks in recent critical media literacy scholarship with trends found in eight semesters of media literacy community action outreach assignments to explore how these frameworks can function as curricular tools for media literacy practitioners. Besides potential tools for media literacy pedagogy, this examination of recent…

  16. 76 FR 18548 - Clean Water Act Section 303(d): Final Agency Action on Three Total Maximum Daily Loads (TMDLs) in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... Louisiana's Mississippi River Basin, under Section 303(d) of the Clean Water Act (CWA). Documents from the... examined by calling or writing Ms. Diane Smith at the address below. Please contact Ms. Smith to schedule an inspection. FOR FURTHER INFORMATION CONTACT: Diane Smith, Environmental Protection...

  17. Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

    SciTech Connect

    Bolinger, Mark; Wiser, Ryan; Darghouth, Naim

    2010-05-05

    This article evaluates the first year of the Section 1603 Treasury cash grant program, which enables renewable power projects in the U.S. to elect cash grants in lieu of the federal tax credits that are otherwise available. To date, the program has been heavily subscribed, particularly by wind power projects, which had received 86% of the nearly $2.6 billion in grants that had been disbursed as of March 1, 2010. As of that date, 6.2 GW of the 10 GW of new wind capacity installed in the U.S. in 2009 had applied for grants in lieu of production tax credits. Roughly 2.4 GW of this wind capacity may not have otherwise been built in 2009 absent the grant program; this 2.4 GW may have supported approximately 51,600 short-term full-time-equivalent (FTE) gross job-years in the U.S. during the construction phase of these wind projects, and 3,860 longterm FTE gross jobs during the operational phase. The program’s popularity stems from the significant economic value that it provides to renewable power projects, relative to the otherwise available tax credits. Although grants reward investment rather than efficient performance, this evaluation finds no evidence at this time of either widespread “gold-plating” or performance problems.

  18. Developing an action-based health and safety training project in southern China.

    PubMed

    Szudy, Betty; O'Rourke, Dara; Brown, Garrett D

    2003-01-01

    A project brought together international footwear manufacturers, labor rights groups, local contract factories, and occupational health professionals to strengthen factory health and safety programs in southern China. Steps involved in the two-year project, including needs assessment, interviews and focus groups with workers and supervisors; design and development of a participatory workshop; development of plant-wide health and safety committees in three footwear factories; and evaluation project impact, are discussed. The project significantly increased occupational safety and health knowledge, and hazards in the factories were identified and corrected. Successes and challenges faced by three functioning worker-management health and safety committees are discussed. Key elements to create effective programs with meaningful participation by workers include: 1) developing clear guidelines that enable multi-stakeholder groups to collaborate; 2) obtaining top-level management support; 3) building workers' knowledge and capacity to fully participate; 4) involving local labor rights groups and occupational professionals in support and technical assistance; and 5) connecting project goals to larger issues within a country and the global economy.

  19. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    PubMed

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them.

  20. Post Remedial Action Report, Lansdowne Radioactive Residence Complex, Dismantlement/Removal Project. Volume 2. Contractor Operations

    DTIC Science & Technology

    1990-06-01

    time for reviein Inatruction. serching ewisting dat swc, gath ,)eriad nmntainn the datal needed, and comleting and r evewng the co action Bf...Management andl lUdgt. Paperwork Reducti/on Prolec (0704401160). Wasingtlon. CC 20503. 1. AGENCY’USE ONLY (Leave blank) 2. REPORT.DATE 3. REPORT TYPE AND...Driveway Replacement R . Jensen, Masonry Contractor GarageFoundations/Stucco J. Cunningham, Pavement Contractor Asphalt PavingWells Fargo Security Systems

  1. The Healthy Bus project in Denmark: need for an action potential assessment.

    PubMed

    Poulsen, Kjeld B

    2004-06-01

    Research over the last 50 years has repeatedly documented that bus drivers are exposed to several physical and psychological risk factors, which are associated with health problems in the form of heart, musculo-skeletal and stomach disease, and increased coronary mortality. So why has there been little action to improve the situation when it is so obviously indicated by such assessments? This article describes the long and complex process that has made it possible to launch almost 200 interventions among the 3500 municipal bus drivers in Copenhagen. Using a participative action research design, new evidence was gathered by broadening the traditional work environmental scope to lifestyle, health issues and private matters. Comparing this updated needs assessment with a national reference population, it was found that drivers were often still worse off. Again, simply presenting new evidence did not seem to lead to changes and further work is needed to empower the stakeholders so that they can commit to start making effective interventions. It is concluded that every needs assessment has to be supplemented with an evaluation of the action potential.

  2. Neutron cross-sections for advanced nuclear systems: the n_TOF project at CERN

    NASA Astrophysics Data System (ADS)

    Barbagallo, M.; Mastromarco, M.; Colonna, N.; Altstadt, S.; Andrzejewski, J.; Audouin, L.; Bécares, V.; Bečvář, F.; Belloni, F.; Berthoumieux, E.; Billowes, J.; Bosnar, D.; Brugger, M.; Calviani, M.; Calviño, F.; Cano-Ott, D.; Carrapiço, C.; Cerutti, F.; Chiaveri, E.; Chin, M.; Cortés, G.; Cortés-Giraldo, M. A.; Diakaki, M.; Domingo-Pardo, C.; Duran, I.; Dressler, R.; Eleftheriadis, C.; Ferrari, A.; Fraval, K.; Ganesan, S.; García, A. R.; Giubrone, G.; Gonçalves, I. F.; González-Romero, E.; Griesmayer, E.; Guerrero, C.; Gunsing, F.; Hernández-Prieto, A.; Jenkins, D. G.; Jericha, E.; Kadi, Y.; Käppeler, F.; Karadimos, D.; Kivel, N.; Koehler, P.; Krtička, M.; Kroll, J.; Lampoudis, C.; Langer, C.; Leal-Cidoncha, E.; Lederer, C.; Leeb, H.; Leong, L. S.; Losito, R.; Manousos, A.; Marganiec, J.; Martínez, T.; Massimi, C.; Mastinu, P. F.; Mendoza, E.; Mengoni, A.; Milazzo, P. M.; Mingrone, F.; Mirea, M.; Mondalaers, W.; Paradela, C.; Pavlik, A.; Perkowski, J.; Plompen, A.; Praena, J.; Quesada, J. M.; Rauscher, T.; Reifarth, R.; Riego, A.; Rubbia, C.; Sabaté-Gilarte, M.; Sarmento, R.; Saxena, A.; Schillebeeckx, P.; Schmidt, S.; Schumann, D.; Tagliente, G.; Tain, J. L.; Tarrío, D.; Tassan-Got, L.; Tsinganis, A.; Valenta, S.; Vannini, G.; Variale, V.; Vaz, P.; Ventura, A.; Vermeulen, M. J.; Vlachoudis, V.; Vlastou, R.; Wallner, A.; Ware, T.; Weigand, M.; Weiß, C.; Wright, T.; Žugec, P.

    2014-12-01

    The study of neutron-induced reactions is of high relevance in a wide variety of fields, ranging from stellar nucleosynthesis and fundamental nuclear physics to applications of nuclear technology. In nuclear energy, high accuracy neutron data are needed for the development of Generation IV fast reactors and accelerator driven systems, these last aimed specifically at nuclear waste incineration, as well as for research on innovative fuel cycles. In this context, a high luminosity Neutron Time Of Flight facility, n_TOF, is operating at CERN since more than a decade, with the aim of providing new, high accuracy and high resolution neutron cross-sections. Thanks to the features of the neutron beam, a rich experimental program relevant to nuclear technology has been carried out so far. The program will be further expanded in the near future, thanks in particular to a new high-flux experimental area, now under construction.

  3. Neighborhood Coat-of-Arms Project: Bloom's Taxonomy and Other Developmental Theories in Action.

    ERIC Educational Resources Information Center

    Woods, Larry

    The progress of groups of junior high school students working together was measured by the developmental theories of Bloom, Piaget, and Kohlberg. Each group was assigned the task of designing a coat-of-arms representing their neighborhood. This project involved not only physically producing a shield (designing, drawing, choosing colors) but also…

  4. Particles in Action. Teacher's Guide. Unit C2. ZIM-SCI, Zimbabwe Secondary School Science Project.

    ERIC Educational Resources Information Center

    Stocklmayer, Sue

    The Zimbabwe Secondary School Science Project (ZIM-SCI) developed student study guides, corresponding teaching guides, and science kits for a low-cost science course which could be taught during the first 2 years of secondary school without the aid of qualified teachers and conventional laboratories. This teaching guide, designed to be read in…

  5. Particles in Action. Study Guide. Unit C2. ZIM-SCI, Zimbabwe Secondary School Science Project.

    ERIC Educational Resources Information Center

    Stocklmayer, Sue

    The Zimbabwe Secondary School Science Project (ZIM-SCI) developed student study guides, corresponding teaching guides, and science kits for a low-cost science course which could be taught during the first 2 years of secondary school without the aid of qualified teachers and conventional laboratories. This ZIM-SCI study guide is a four-part unit…

  6. The Facebook-in-Action: Challenging, Harnessing and Enhancing Students Class Assignments and Projects

    ERIC Educational Resources Information Center

    Saifudin, Adam Mohd; Yacob, Aizan; Saad, Rohaizah

    2016-01-01

    Issues of universities students harnessing and capitalizing the usage of Facebook for their own learning capabilities and effective thinking is always the focus of education scholars, in assessing the quality class assignments and projects produced by them. Therefore, Facebook is now becoming unbearable influence since the internet activation in…

  7. Project Citizen: Promoting Action-Oriented Citizen Science in the Classroom

    ERIC Educational Resources Information Center

    Green, Carie; Medina-Jerez, William

    2012-01-01

    In recent years, citizen science projects have emerged as a means to involve students in scientific inquiry, particularly in the fields of ecology and environmental science. A citizen scientist is "a volunteer who collects and/or processes data as part of a scientific inquiry" (Silverton 2009, p. 467). Participation in citizen science fosters an…

  8. How Your PTA Can Participate in the Drug and Alcohol Project: National PTA in Action.

    ERIC Educational Resources Information Center

    Hoffman, Patricia; Carter, Denise

    1983-01-01

    This article suggests ways that parent-teacher associations can participate in a new drug and alcohol project launched by the national organization. A quiz to increase awareness of drug abuse is included, along with a list of educational materials and sources of further information. (PP)

  9. Evaluation of an Action-Research Project by University Environmental Volunteers

    ERIC Educational Resources Information Center

    Raimondo, Ana Maria; Monti, Alejandro J. A.; Perales-Palacios, F. Javier; Gutiérrez-Pérez, José

    2017-01-01

    The university volunteer programs in Argentina encourage entrepreneurship culture through the development of innovative socio-environmental projects that promote a joint effort between the different administrations of the State, the universities and regional social organizations. One, called "environment and social inclusion" has been…

  10. A Collaborative Action Research Project on Assessment and the Implications for the Pre-Service Participant.

    ERIC Educational Resources Information Center

    Seda, Ileana; Mamana, Lisa A.

    A study focused on a university-school collaborative research project on language assessment in the classroom context and the benefits of preservice teacher participation. Personnel from the Pennsylvania State University (including 20 preservice teacher education students), intermediate unit (Pennsylvania's regional service centers), and four…

  11. Community Colleges and Regional Recovery: Strategies for State Action. Project on State and Metropolitan Innovation

    ERIC Educational Resources Information Center

    Kazis, Richard

    2011-01-01

    Employers need a pipeline of quality workers with different levels of skill and desired earnings. Almost half of U.S. jobs today can be defined as "middle skill" jobs, requiring less than a four-year degree but more than a high school diploma. The Bureau of Labor Statistics (BLS) occupational projections indicate that job categories for…

  12. 12 Years of Action Learning at EM Normandie: Monitored Field Projects as Regular Pedagogical Activities

    ERIC Educational Resources Information Center

    Anger, Sophie Gay; Hachard, Virginie

    2011-01-01

    The Master Grande Ecole curriculum at EM Normandie School is organized around junior consulting projects and real problem solving activities aiming at bridging the gap between classroom knowledge and professional competencies. Since the 90's, students are involved in regular consulting activities for local and national companies following the…

  13. 2014 Well Completion Report for Corrective Action Unit 447 Project Shoal Area Churchill County, Nevada October 2015

    SciTech Connect

    Findlay, Rick

    2015-11-01

    This report summarizes the drilling program conducted by the U.S. Department of Energy (DOE) Office of Legacy Management at the Project Shoal Area (Shoal) Subsurface Corrective Action Unit 447 in Churchill County, Nevada. Shoal was the location of an underground nuclear test conducted on October 26, 1963, as part of the Vela Uniform program sponsored jointly by the U.S. Department of Defense and the U.S. Atomic Energy Commission (a predecessor to DOE). The test consisted of detonating a 12-kiloton nuclear device in granitic rock at a depth of approximately 1,211 feet (ft) below ground surface (bgs) (AEC 1964). The corrective action strategy for the site is focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network at the site. Field activities associated with the project were conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended) and applicable Nevada Division of Environmental Protection (NDEP) policies and regulations.

  14. Women Reaching Women: A Story of Change. The Role of Narrative in Building Trust and Commitment during an Action Research Project

    ERIC Educational Resources Information Center

    Langley, Dawn

    2012-01-01

    Women Reaching Women was a three-year action research project aimed at raising awareness of world poverty, gender inequality and climate change. The project brought together the National Federation of Women's Institutes, Oxfam, the Everyone Foundation and a unique group of 28 women drawn from Women's Institutes across the country. The project…

  15. Seeking to Bridge the Divide: Linking Formal and Non-Formal Education in Uttar-Pradesh, India. IBE Collaborative Projects: Strengthening Capacities through Action

    ERIC Educational Resources Information Center

    Zutshi, Bupinder

    2004-01-01

    The new monograph series, IBE Collaborative Projects: Strengthening Capacities through Action, documents projects initiated and managed by local or national level institutions in diverse countries, which have been technically or academically assisted by UNESCO's International Bureau of Education (IBE). This first publication in the series…

  16. 77 FR 50207 - Notice of Final Federal Agency Actions on Project: I-5: Glendale-Hugo Paving/Sexton Climbing Lane...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Project: I-5: Glendale- Hugo... relate to a proposed highway project, I-5: Glendale-Hugo Paving/Sexton Climbing Lane, in Douglas and...) 231- 2336. The I-5: Glendale-Hugo Paving/Sexton Climbing Lane categorical exclusion and other...

  17. Project ALIVE: An Action-Research Exploration of EMR Value in Primary Care.

    PubMed

    Alexander, Ted; Singh, Neha; Huda, Shahrin; Alarakhia, Mohamed

    2015-01-01

    This paper outlines a quality assurance (QA) process and a multiple case, explorative, electronic medical records (EMRs) project in Ontario. The project, dedicated to Advancing and Leveraging the Investment Value of EMRs (ALIVE) was an eight-month investigation of improvements to EMRs in terms of the technical elements of patient records that could be optimized through data standardization and the social elements needed to integrate value into the everyday functioning of primary care (PC) organizations. We argue that standardized and structured data offer substantial clinical value in PC insofar as it enables more proactive chronic disease prevention and management (CDPM). While PC clinicians may have had the opportunity to look the other way with respect to enabling technologies in the past, imminent health system reforms demand more meaningful use of EMRs moving forward.

  18. Service user integration into social work education: lessons learned from nordic participatory action projects.

    PubMed

    Angelin, Anna

    2015-01-01

    Service users have lacked substantial influence, access, and participation in social work education in Norway and Sweden. In this article the author presents comparative analyses of two participatory projects that have developed and implemented practices that integrate service users into academic social work education and empower service users. The Norwegian HUSK project and the Social Work as Mobilization and Entrepreneurship course, also known as the "Mobilization course," at Lund University in Sweden demonstrate collaboration between research, social work education, and service users. The conclusions focus on the importance of the empowering processes by including recognition and dialogue, co-learning in practice, and the use of neutral venues to ensure effective user participation. The inclusion of service users in social work education can improve both practice and education.

  19. Post Remedial Action Report, Lansdowne Radioactive Residence Complex, Dismantlement/Removal Project. Volume 1. Government Operations

    DTIC Science & Technology

    1990-06-01

    Health Physicist ; Sherri Johnson, Office6Manager, Raymond Huston, Project Manager. pwWCrk o .Fotrw lf orgt oo aw - auoiCne,,ss esmy.Fot oleft to...treatment of cancer patients. Process effluent from the refining process permeated through all parts of the house, including the adjacent 107 side, then...Decision of 22 Sept., 1986, they elected to exercise an existing inter-agency agreement with the Corps of Engineers for undertaking Federal Lead

  20. The chromosome-centric human proteome project: a call to action.

    PubMed

    Hühmer, Andreas F R; Paulus, Aran; Martin, LeRoy B; Millis, Kevin; Agreste, Tasha; Saba, Julian; Lill, Jennie R; Fischer, Steven M; Dracup, William; Lavery, Paddy

    2013-01-04

    The grand vision of the human proteome project (HPP) is moving closer to reality with the recent announcement by HUPO of the creation of the HPP consortium in charge of the development of a two-part HPP, one focused on the description of proteomes of biological samples or related to diseases (B/D-HPP) and the other dedicated to a systematic description of proteins as gene products encoded in the human genome (the C-HPP). This new initiative of HUPO seeks to identify and characterize at least one representative protein from every gene, create a protein distribution atlas and a protein pathway or network map. This vision for proteomics can be the roadmap of biological and clinical research for years to come if it delivers on its promises. The Industrial Advisory Board (IAB) to HUPO shares the visions of C-HPP. The IAB will support and critically accompany the overall project goals and the definitions of the critical milestones. The member companies are in a unique position to develop hardware and software, reagents and standards, procedures, and workflows to ensure a reliable source of tools available to the proteomics community worldwide. In collaboration with academia, the IAB member companies can and must develop the tools to reach the ambitious project goals. We offer to partner with and challenge the academic groups leading the C-HPP to define both ambitious and obtainable goals and milestones to make the C-HPP a real and trusted resource for future biology.

  1. Issues Affecting Acquisition Strategies for Remedial Action Projects at Installation Restoration Program Sites

    DTIC Science & Technology

    1992-09-01

    Indemnification .............. :.....56 Typical Uses of Indemnification the Past ....... .......... .. 56 Indemnification’s Environmental History ....... ........ .. 57...responsible for upgrading the country’s air traffic control system (26:6-7). Indemnification’s Environmental History . In 1986, SARA added section 119

  2. Teaching clinical reasoning by making thinking visible: an action research project with allied health clinical educators

    PubMed Central

    2014-01-01

    Background Clinical reasoning is fundamental to all forms of professional health practice, however it is also difficult to teach and learn because it is complex, tacit, and effectively invisible for students. In this paper we present an approach for teaching clinical reasoning based on making expert thinking visible and accessible to students. Methods Twenty-one experienced allied health clinical educators from three tertiary Australian hospitals attended up to seven action research discussion sessions, where they developed a tentative heuristic of their own clinical reasoning, trialled it with students, evaluated if it helped their students to reason clinically, and then refined it so the heuristic was targeted to developing each student’s reasoning skills. Data included participants’ written descriptions of the thinking routines they developed and trialed with their students and the transcribed action research discussion sessions. Content analysis was used to summarise this data and categorise themes about teaching and learning clinical reasoning. Results Two overriding themes emerged from participants’ reports about using the ‘making thinking visible approach’. The first was a specific focus by participating educators on students’ understanding of the reasoning process and the second was heightened awareness of personal teaching styles and approaches to teaching clinical reasoning. Conclusions We suggest that the making thinking visible approach has potential to assist educators to become more reflective about their clinical reasoning teaching and acts as a scaffold to assist them to articulate their own expert reasoning and for students to access and use. PMID:24479414

  3. An Action Research Project on Preparing Teachers to Meet the Needs of Underserved Student Populations

    NASA Astrophysics Data System (ADS)

    Buck, Gayle A.; Cordes, Jeanene G.

    2005-02-01

    The focus of this action research study was on the initial stage in reforming our teacher preparation programs. We designed, conducted, evaluated, and revised the components of our teacher preparation programs that were aimed at providing preservice teachers with the confidence and knowledge needed to meet the needs of youth populations underserved in science education. The conceptual framework of this study predicted that providing preservice teachers with experiences in teaching science to at-risk youth in a nonformal educational setting and that exploring these experiences in a seminar setting will increase the teachers confidence and knowledge in regard to teaching science to children from underserved populations. The community-based experience allowed for an experience in which 20 preservice teachers taught in a situation in which at-risk youth were the majority, thus spotlighting their needs in a manner traditionally not experienced by these prospective teachers. A two-phase methodological design (J. Creswell, 1994) was utilized to answer the questions: (a) Did the plan lead to the desired outcomes? and (b) What strategies fostered or hindered progress toward the desired outcomes? The findings of this study were utilized to develop our next action step in preparing teachers to foster science literacy for All Americans.

  4. Leading multi-professional teams in the children’s workforce: an action research project

    PubMed Central

    Stuart, Kaz

    2012-01-01

    Introduction The 2004 Children Act in the UK saw the introduction of integrated working in children’s services. A raft of change followed with processes designed to make joint working easier, and models and theories to support the development of integrated work. This paper explores the links between key concepts and practice. Methods A practitioner action research approach is taken using an autoethnographic account kept over six months. The research question was, to what extent is this group collaborating? Results When the architecture of practice was revealed, differences between espoused and real practice could be seen. Whilst understanding and displaying the outward signs of an effective multi professional group, the individuals did not trust one another. This was exhibited by covert interprofessional issues. As a result, collaborative inertia was achieved. This realisation prompted them to participate in further developmental and participative action research. Conclusion The paper concludes that trust and relational agency are central to effective leadership of multi professional teams. PMID:22371690

  5. 40 CFR 230.77 - Other actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Other actions. 230.77 Section 230.77... Effects § 230.77 Other actions. (a) In the case of fills, controlling runoff and other discharges from... needs of fish and wildlife; (c) In dredging projects funded by Federal agencies other than the Corps...

  6. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1987-05-01

    This appendix assesses the present conditions and data for the inactive uranium mill site near Tuba City, Arizona. It consolidates available engineering, radiological, geotechnical, hydrological, meterological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill and tailings site so that the Remedial Action Contractor (RAC) may complete final designs of the remedial actions.

  7. Quarry Haul Road Ecological Survey. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri: Revision 1

    SciTech Connect

    Not Available

    1992-09-01

    This biological survey was performed to document the summer flora and fauna found along the haul road constructed as part of the remedial action for the quarry bulk waste. State and Federal species listed as threatened or endangered were noted if encountered while surveying. Sampling locations were equally spaced along the quarry haul road, and a survey for vegetation and birds conducted at each location. Bird observations were conducted as breeding bird surveys once in June of 1991, and again in June of 1992. Each year`s survey includes two observations in the early morning and one late in the evening. Vegetation surveys were conducted in 1991 using quadrants and transects. mammal, reptile, and amphibian sightings were noted as encountered.

  8. Findings and actions by the IR-4 Project in response to a bushel of EPA inspections.

    PubMed

    Hackett-Fields, K; White, T L

    1999-01-01

    The IR-4 Project is dedicated to all aspects of minor crop pest management, in cooperation between USDA, universities, and other state or Federal entities. Human safety decisions made by EPA are based upon field raw data, analytical reports, and scientific review and interpretation. Quality Assurance personnel, an independent body of internal inspectors and auditors, assist both regulatory inspector and on-site field personnel during EPA site inspections. This article contains information gleaned from a large number of university and other test site inspections, which were conducted by EPA to fulfill requirements of Good Laboratory Practice regulations, 40 CFR 160.

  9. The GODAE High Resolution SST Project: Standards Based Interoperability in Action

    NASA Astrophysics Data System (ADS)

    Casey, K. S.

    2007-12-01

    The Global Ocean Data Assimilation Experiment (GODAE) High Resolution Sea Surface Temperature (GHRSST) project is a large scale international effort to coordinate the production, distribution, and archiving of a wide range of satellite-based SST datasets. Built on existing standards for data formats and both file-level and collection- level metadata, the GHRSST project has achieved a high level of success in an area that has seen little past national cooperation and even less international cooperation. Today, GHRSST data are produced in common formats following internationally accepted content standards by government agencies, academic institutions, and commercial companies around the world. By following the format and content standards for metadata and data, GHRSST has successfully built and deployed a Regional/Global Task Sharing framework in which data and metadata are produced at local centers but centrally managed at a Global Data Assembly Center and archived at a Long Term Stewardship and Reanalysis Facility. Interoperable data access is enabled at all levels of this international framework. This presentation will examine the lessons learned over the last several years as GHRSST has adopted numerous standards, including netCDF with Climate and Forecast (CF) attribute conventions for data, and both Global Change Master Directory Document Interchange Format and Federal Geographic Data Commission standards for metadata. Plans for future adoption of emerging standards like netCDF-4 and ISO19115 will also be discussed.

  10. 42 CFR 137.376 - Are design and construction projects performed by Self-Governance Tribes under section 509 of the...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Other § 137.376 Are design and construction projects performed by Self-Governance Tribes under section 509 of the Act subject... negotiate the use of Federal metric requirements in the construction project agreement when the...

  11. 42 CFR 137.325 - What does a Self-Governance Tribe do if it wants to perform a construction project under section...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.325 What does a Self-Governance Tribe do if it wants to perform a construction project under section 509 of the Act ? (a) A Self... 42 Public Health 1 2010-10-01 2010-10-01 false What does a Self-Governance Tribe do if it wants...

  12. Tele-autonomous systems: New methods for projecting and coordinating intelligent action at a distance

    NASA Technical Reports Server (NTRS)

    Conway, Lynn; Volz, Richard; Walker, Michael W.

    1989-01-01

    There is a growing need for humans to perform complex remote operations and to extend the intelligence and experience of experts to distant applications. It is asserted that a blending of human intelligence, modern information technology, remote control, and intelligent autonomous systems is required, and have coined the term tele-autonomous technology, or tele-automation, for methods producing intelligent action at a distance. Tele-automation goes beyond autonomous control by blending in human intelligence. It goes beyond tele-operation by incorporating as much autonomy as possible and/or reasonable. A new approach is discussed for solving one of the fundamental problems facing tele-autonomous systems: The need to overcome time delays due to telemetry and signal propagation. New concepts are introduced called time and position clutches, that allow the time and position frames between the local user control and the remote device being controlled, to be desynchronized respectively. The design and implementation of these mechanisms are described in detail. It is demonstrated that these mechanisms lead to substantial telemanipulation performance improvements, including the result of improvements even in the absence of time delays. The new controls also yield a simple protocol for control handoffs of manipulation tasks between local operators and remote systems.

  13. Groundwater Model Validation for the Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2008-05-19

    Stoller has examined newly collected water level data in multiple wells at the Shoal site. On the basis of these data and information presented in the report, we are currently unable to confirm that the model is successfully validated. Most of our concerns regarding the model stem from two findings: (1) measured water level data do not provide clear evidence of a prevailing lateral flow direction; and (2) the groundwater flow system has been and continues to be in a transient state, which contrasts with assumed steady-state conditions in the model. The results of DRI's model validation efforts and observations made regarding water level behavior are discussed in the following sections. A summary of our conclusions and recommendations for a path forward are also provided in this letter report.

  14. 20 CFR 641.600 - What is the purpose of the private sector training projects authorized under section 502(e) of...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What is the purpose of the private sector training projects authorized under section 502(e) of the OAA? 641.600 Section 641.600 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROVISIONS GOVERNING THE SENIOR COMMUNITY SERVICE EMPLOYMENT PROGRAM Private...

  15. Measuring Muon-Neutrino Charged-Current Differential Cross Sections with a Liquid Argon Time Projection Chamber

    SciTech Connect

    Spitz, Joshua B.

    2011-01-01

    More than 80 years after its proposed existence, the neutrino remains largely mysterious and elusive. Precision measurements of the neutrino's properties are just now beginning to take place. Such measurements are required in order to determine the mass of the neutrino, how many neutrinos there are, if neutrinos are different than anti-neutrinos, and more. Muon-neutrino charged-current differential cross sections on an argon target in terms of the outgoing muon momentum and angle are presented. The measurements have been taken with the ArgoNeuT Liquid Argon Time Projection Chamber (LArTPC) experiment. ArgoNeuT is the first LArTPC to ever take data in a low energy neutrino beam, having collected thousands of neutrino and anti-neutrino events in the NuMI beamline at Fermilab. The results are relevant for long baseline neutrino oscillation experiments searching for non-zero $\\theta_{13}$, CP-violation in the lepton sector, and the sign of the neutrino mass hierarchy, among other things. Furthermore, the differential cross sections are important for understanding the nature of the neutrino-nucleus interaction in general. These measurements represent a significant step forward for LArTPC technology as they are among the first neutrino physics results with such a device.

  16. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    SciTech Connect

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  17. Scientific support by the BONUS+ projects for the sustainability of the Baltic Sea Region: the case of the HELCOM Baltic Sea Action Plan.

    PubMed

    Kononen, Kaisa; Andrusaitis, Andris; Sirola, Maija

    2014-02-01

    The synthesis of the BONUS+ research is introduced. The HELCOM Baltic Sea Action Plan is examined as a case to illustrate the potentials and challenges in building the science-policy making interface on a macro regional level. The projects address environmental challenges in the Baltic Sea as defined by the Baltic Sea Action Plan, or consider the environmental governance and decision making within the Baltic Sea context in general. Eutrophication, biodiversity, hazardous substances, maritime activities, and the environment governance are addressed, as are cross cutting issues, such as the impact of climate change, maritime spatial planning and impacts of future development on ecosystem services. The projects contributed to relevant policy developments: 37 consultations carried out at EU level, 49 modifications to policy documents and action plans, 153 suggestions for the efficacy of pertinent public policies and governance, and in 570 occasions, scientists working in BONUS+ projects served as members or observers in scientific and stakeholder committees.

  18. An assessment of plant biointrusion at the Uranium Mill Tailings Remedial Action Project rock-covered disposal cells

    SciTech Connect

    Not Available

    1990-10-01

    This study is one of a number of special studies that have been conducted regarding various aspects of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This special study was proposed following routine surveillance and maintenance surveys and observations reported in a special study of vegetative covers (DOE, 1988), in which plants were observed growing up through the rock erosion layer at recently completed disposal cells. Some of the plants observed were deep-rooted woody species, and questions concerning root intrusion into disposal cells and the need to control plant growth were raised. The special study discussed in this report was designed to address some of the ramifications of plant growth on disposal cells that have rock covers. The NRC has chosen rock covers over vegetative covers in the arid western United States because licenses cannot substantiate that the vegetative covers will be significantly greater than 30 percent and preferably 70 percent,'' which is the amount of vegetation required to reduce flow to a point of stability.'' The potential impacts of vegetation growing in rock covers are not addressed by the NRC (1990). The objectives, then, of this study were to determine the species of plants growing on two rock-covered disposal cells, study the rooting pattern of plants on these cells, and identify possible impacts of plant root penetration on these and other UMTRA Project rock-covered cells.

  19. Projecting future wave climates and corresponding shoreline changes along the differently exposed coastal sections of the Baltic Sea

    NASA Astrophysics Data System (ADS)

    Suursaar, Ülo; Tõnisson, Hannes

    2015-04-01

    The aim of the study is to analyze the recently observed and projected future coastal changes in differently exposed Estonian coastal sections as a result of changing wind and wave climates. Along the shoreline of the practically tideless Baltic Sea, the increase in storminess has already impacted the coastal environment over the last 50 years. However, the number of storms, as well as their pathways, has been fluctuating considerably over the last decades. Furthermore, forecasting future hydrodynamic conditions and corresponding coastal changes is a rather mixed, yet crucial task. A number of Estonian study sites have been regularly examined by coastal scientists since the 1960s. Six coastal sections have been chosen for this study: Harilaid Peninsula (exposed to SW), Letipea-Sillamäe (N), Kõiguste-Nasva (SE), Kihnu-Pärnu (S), and two sides of the Osmussaar Island (W, N). Since the 2000s, use of GPS instruments and GIS software has enabled year-to-year changes in the shoreline to be tracked and the calculation of the corresponding areas or volumes due to accumulation and erosion. Recently digitized aerial photographs, as well as orthophotos and old topographic maps, enable the calculation of changes over longer sub-periods. Based on recorded and hindcasted changes in wind-driven hydrodynamic conditions, we found relationships between forcing conditions and the rates at which shorelines were changing. For future changes, wave climates were projected for the selected coastal sections of special geomorphic interest, where also a series of hydrodynamic surveys (waves, currents, sea level) were carried out using ADCP-s in 2006-2014. Wave parameters were consecutively hindcasted using a site-dependently calibrated fetch-based wave model. As the full calculation period (1966-2013) might suffer from inhomogeneity of wind input data, a confidently homogeneous time cut (2004-2013; 10 full years with hourly resolution) was chosen as a baseline (or control) period. An

  20. Toward Improving Atmospheric Models and Ozone Projections: Laboratory UV Absorption Cross Sections and Equilibrium Constant of ClOOCl

    NASA Astrophysics Data System (ADS)

    Wilmouth, D. M.; Klobas, J. E.; Anderson, J. G.

    2015-12-01

    Thirty years have now passed since the discovery of the Antarctic ozone hole, and despite comprehensive international agreements being in place to phase out CFCs and halons, polar ozone losses generally remain severe. The relevant halogen compounds have very long atmospheric lifetimes, which ensures that seasonal polar ozone depletion will likely continue for decades to come. Changes in the climate system can further impact stratospheric ozone abundance through changes in the temperature and water vapor structure of the atmosphere and through the potential initiation of solar radiation management efforts. In many ways, the rate at which climate is changing must now be considered fast relative to the slow removal of halogens from the atmosphere. Photochemical models of Earth's atmosphere play a critical role in understanding and projecting ozone levels, but in order for these models to be accurate, they must be built on a foundation of accurate laboratory data. ClOOCl is the centerpiece of the catalytic cycle that accounts for more than 50% of the chlorine-catalyzed ozone loss in the Arctic and Antarctic stratosphere every spring, and so uncertainties in the ultraviolet cross sections of ClOOCl are particularly important. Additionally, the equilibrium constant of the dimerization reaction of ClO merits further study, as there are important discrepancies between in situ measurements and lab-based models, and the JPL-11 recommended equilibrium constant includes high error bars at atmospherically relevant temperatures (~75% at 200 K). Here we analyze available data for the ClOOCl ultraviolet cross sections and equilibrium constant and present new laboratory spectroscopic results.

  1. Making Meaning about Educational Experiences through Participatory Action Research: A Project Conducted with Adults Enrolled in a Community College Mathematics Course

    ERIC Educational Resources Information Center

    Moreno, German Alonso

    2015-01-01

    This paper discusses the findings of a group of co-researchers involved in a participatory action research (PAR) project conducted with adults in a developmental education program. The co-researchers were mostly individuals of Hispanic descent, who had struggled in the past with schooling. Because the educational experiences of Hispanics often…

  2. An Action Research Project: Development of a Pre-Licensure Examination Review Course for Emergency Medical Technician Program Graduates at a Rural Community College

    ERIC Educational Resources Information Center

    Boucher, Daryl

    2013-01-01

    This action research project examined how "Efficiency in Learning" ("EL") strategies, "Appreciative Inquiry" ("AI") and the "Interactive Model of Program Planning" ("IMPP") could be used to discern the content and preferred pedagogical approaches in the development of a pre-licensure…

  3. Charter Schools As Seen by Those Who Know Them Best: Students, Teachers, and Parents. Charter Schools in Action Project, Final Report--Part I.

    ERIC Educational Resources Information Center

    Vanourek, Gregg; And Others

    Although charter schools have provoked much interest, there has not been a systematic nationwide effort to ask the clients and teachers of charter schools what they think about them. During the 1996-97 school year, Hudson Institute's Charter Schools in Action Project gathered quantitative data that describe 50 charter schools enrolling…

  4. 78 FR 64593 - Notice of Final Federal Agency Actions on US 26: MP 49.20-MP 57.45 Project: Clackamas County, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... existing passing lanes and install new median barrier. The project will preserve the existing pavement by removing the top 2 to 3 inches of the existing asphalt concrete pavement, recycling it, and repaving it... Wetlands; E.O. 11988 Floodplain Management; E.O. 12898, Federal Actions to Address Environmental Justice...

  5. Discovering Researcher Subjectivities, Perceptions, and Biases: A Critical Examination of Myths, Metaphors, and Meanings Inherent in University-School Collaborative Action Research Projects.

    ERIC Educational Resources Information Center

    Dana, Nancy Fichtman

    This paper describes a collaborative action research project conducted by a university researcher and a group of elementary school teachers. It examines the role the researcher plays when educational change is initiated by practitioners and the nature of the relationship that develops between researcher and practitioners throughout the change…

  6. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  7. Using Nikola Tesla's Story and His Experiments as Presented in the Film "The Prestige" to Promote Scientific Inquiry: A Report of an Action Research Project

    ERIC Educational Resources Information Center

    Hadzigeorgiou, Yannis; Garganourakis, Vassilios

    2010-01-01

    This paper reports on an action research project undertaken with the primary aim of investigating the extent to which situations that evoke a sense of wonder can promote scientific inquiry. Given the intense interest, curiosity, and wonder that some students had begun to develop after seeing the film "The Prestige", a science teacher…

  8. The Streambank Erosion Control Evaluation and Demonstration Act of 1974, Section 32, Public Law 93-251. Appendix E. Missouri River Demonstration Projects. Volume 1.

    DTIC Science & Technology

    1981-12-01

    Act of 1974 VISsOUut RvIM, caue DM To 1&U ohm, I -DA A INUCRATIUN g A. P2JECT ElMW AMD LOCII. Seventeen demonstration projects have been constructed ...evaluate the per- formance of the 17 Section 32 demonstration projects on the Missouri ’ River, between Garrison Dam and Lake Oahe, constructed and...of Garrison Dam which causes sizable fluctuation in daily releases, as discussed in subparagraph c. b. Construction Reference Plane. The Construction

  9. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    SciTech Connect

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  10. Waste minimization opportunities at the U.S. Uranium Mill Tailings Remedial Action (UMTRA) Project, Rifle, Colorado, site

    SciTech Connect

    Hartmann, G.L.; Arp, S.; Hempill, H.

    1993-12-31

    At two uranium mill sites in Rifle, Colorado, the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is removing uranium mill tailings and contaminated subgrade soils. This remediation activity will result in the production of groundwater contaminated with uranium, heavy metals, ammonia, sulfates, and total dissolved solids (TDS). The initial remediation plan called for a wastewater treatment plant for removal of the uranium, heavy metals, and ammonia, with disposal of the treated water, which still includes the sulfates and TDSS, to the Colorado River. The National Pollutant Discharge Elimination (NPDES) permit issued by the Colorado Department of Health for the two Rifle sites contained more restrictive discharge limits than originally anticipated. During the detailed review of alternate treatment systems to meet these more restrictive limits, the proposed construction procedures were reviewed emphasizing the methods to minimize groundwater production to reduce the size of the water treatment facility, or to eliminate it entirely. It was determined that with changes to the excavation procedures and use of the contaminated groundwater for use in dust suppression at the disposal site, discharge to the river could be eliminated completely.

  11. Understanding the challenges of palliative care in everyday clinical practice: an example from a COPD action research project.

    PubMed

    Hynes, Geralyn; Kavanagh, Fiona; Hogan, Christine; Ryan, Kitty; Rogers, Linda; Brosnan, Jenny; Coghlan, David

    2015-09-01

    Palliative care seeks to improve the quality of life for patients suffering from the impact of life-limiting illnesses. Palliative care encompasses but is more than end-of-life care, which is defined as care during the final hours/days/weeks of life. Although palliative care policies increasingly require all healthcare professionals to have at least basic or non-specialist skills in palliative care, international evidence suggests there are difficulties in realising such policies. This study reports on an action research project aimed at developing respiratory nursing practice to address the palliative care needs of patients with advanced chronic obstructive pulmonary disease (COPD). The findings suggest that interlevel dynamics at individual, team, interdepartmental and organisational levels are an important factor in the capacity of respiratory nurses to embed non-specialist palliative care in their practice. At best, current efforts to embed palliative care in everyday practice may improve end-of-life care in the final hours/days/weeks of life. However, embedding palliative care in everyday practice requires a more fundamental shift in the organisation of care.

  12. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  13. 75 FR 58380 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... clarifiers as part of a larger overall wastewater treatment plant upgrade project. This is a project specific... final clarifier equipment is failing, and given that existing wastewater flows at the wastewater... gates for two final clarifiers as part of a wastewater treatment plant upgrade project. Based on...

  14. 76 FR 26725 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... Wastewater Treatment Plant Upgrade project. This is a project specific waiver and only applies to the use of... of two specified aeration blower units as part of its Airport Parkway Wastewater Treatment Plant... Wastewater Treatment Facility Upgrade construction project is approximately two thirds completed. One of...

  15. Bilingual Education Talented Academy: Gifted and Talented, Project BETA, 1988-89. Evaluation Section Report [and] Executive Summary. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Cantalupo, Denise

    This evaluation report describes the Bilingual Education Talented Academy--Gifted and Talented Project (Project BETA) in its first year of a 3-year Elementary and Secondary Education Act Title VII funding cycle. The project served 307 students of limited English proficiency in two Bronx (New York) high schools. The predominant native languages…

  16. 75 FR 3464 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... manufactured submersible pump. This is a project specific waiver and only applies to the use of the specified... tunnel lift station project will include installation of two submersible pumps as well as the purchase of one spare pump. The project was originally designed between 2003 and 2006, and bids were taken...

  17. Ethical considerations related to participation and partnership: an investigation of stakeholders’ perceptions of an action-research project on user fee removal for the poorest in Burkina Faso

    PubMed Central

    2014-01-01

    Background Healthcare user fees present an important barrier for accessing services for the poorest (indigents) in Burkina Faso and selective removal of fees has been incorporated in national healthcare planning. However, establishing fair, effective and sustainable mechanisms for the removal of user fees presents important challenges. A participatory action-research project was conducted in Ouargaye, Burkina Faso, to test mechanisms for identifying those who are indigents, and funding and implementing user fee removal. In this paper, we explore stakeholder perceptions of ethical considerations relating to participation and partnership arising in the action-research. Methods We conducted 39 in-depth interviews to examine ethical issues associated with the action-research. Respondents included 14 individuals identified as indigent through the community selection process, seven members of village selection committees, six local healthcare professionals, five members of the management committees of local health clinics, five members of the research team, and four regional or national policy-makers. Using constant comparative techniques, we carried out an inductive thematic analysis of the collected data. Results The Ouargaye project involved a participatory model, included both implementation and research components, and focused on a vulnerable group within small, rural communities. Stakeholder perceptions and experiences relating to the participatory approach and reliance on multiple partnerships in the project were associated with a range of ethical considerations related to 1) seeking common ground through communication and collaboration, 2) community participation and risk of stigmatization, 3) impacts of local funding of the user fee removal, 4) efforts to promote fairness in the selection of the indigents, and 5) power relations and the development of partnerships. Conclusions This investigation of the Ouargaye project serves to illuminate the distinctive

  18. Review Plan Using the NWD Model Review Plan for Continuing Authorities Program Section 14, 107, 111, 204, 206, 208, 1135 and Projects Directed by Guidance to Use CAP Procedures: Sheridan, Wyoming, Section 1135 Project

    DTIC Science & Technology

    2014-12-19

    existing Sheridan, Wyoming flood control project, authorized for construction by the Flood Control Act of 1950 (P.L. 516), consists of levees, channel... flood discharges in Goose and Little Goose Creeks. Construction of the Sheridan Project was completed in two stages. Stage 1 was started in August...1995. Figure 1 shows the entire study reach and the various flood risk management features that were constructed as part of the existing project

  19. 78 FR 27473 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River... within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the Tappan Zee Hudson River Crossing... FHWA published a ``Notice of Final Federal Agency Actions'' on the Tappan Zee Hudson River...

  20. Assessment in Action: Collaborative Action Research Focused on Mathematics and Science Assessments. Reports of Twenty-Three Teacher-Research Projects.

    ERIC Educational Resources Information Center

    Dearn, Ceri; And Others

    The works reported in this book represent a second phase to a 2-day summer conference that focused on assessment in mathematics and science classrooms. This book presents research and findings of a subset of the conference participants who investigated a self-selected aspect of assessment in their educational environments. Action research was the…

  1. 77 FR 2533 - Boulder Canyon Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... Area Power Administration Boulder Canyon Project AGENCY: Western Area Power Administration, DOE. ACTION... Boulder Canyon Project (BCP) electric service base charge and rates. The current base charge and rates... subsequent laws, particularly section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c));...

  2. 40 CFR 35.6700 - Project records.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Project records. 35.6700 Section 35... Actions Records Requirements Under A Cooperative Agreement § 35.6700 Project records. The lead agency for... assistance (whether lead or support agency) are responsible for maintaining project files described...

  3. 40 CFR 35.6700 - Project records.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Project records. 35.6700 Section 35... Actions Records Requirements Under A Cooperative Agreement § 35.6700 Project records. The lead agency for... assistance (whether lead or support agency) are responsible for maintaining project files described...

  4. 75 FR 22129 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... project approvals and permits from the Massachusetts Historical Commission, the Massachusetts Natural... being supplied comes equipped with vibration sensors to shut down the turbine when ice build up...

  5. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Chernoff, A.R. . Uranium Mill Tailings Remedial Action Project Office); Lacker, D.K. . Bureau of Radiation Control)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  6. Harmony in Career Learning and Scholastic System: Project Hi-Class 1988-89. OREA Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Hriskos, Constantine

    The report presents an evaluation of the New York City Harmony in Career Learning and Scholastic System (Project HI-CLASS) based on results from the 1988-89 school year. The project provided support services to 420 Spanish- and Chinese-speaking students of limited English proficiency (LEP). It also proposed to instill pride in and respect for…

  7. 75 FR 58379 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... upgrade project at the Auburn-Lewiston Water Treatment Facility. This is a project specific waiver and... Enhanced Surface Water Treatment Rule requirements of the Safe Drinking Water Act, and part of the work... Reinvestment Act of 2009 (ARRA) to the City of Lewiston, ME and the Auburn, Maine Water District...

  8. 76 FR 3136 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... Columbia, MO (``City'') for the purchase of two (2) foreign manufactured Toshiba LQ500 Density Analyzers in... requirements and project specifications for the Toshiba LQ500 density analyzer, a list of potential... manufactured density analyzers available to meet the City's project specifications. The Regional...

  9. 76 FR 80373 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... Buckland for Flygt submersible wastewater pumps and appurtenances, City of Chignik for water treatment... projects occur in remote locations, the summer construction season is very short, and water and wastewater... applicability of Buy American provisions. Delaying ongoing construction projects of needed water and...

  10. 75 FR 25242 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... funds may be used for the construction, alteration, maintenance, or repair of a public building or... increase the cost of the overall project by more than 25 percent. These manufactured goods will provide... project, but had never manufactured a turbo-compressor the size of the 322-hp models required for...

  11. 76 FR 37350 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-27

    .../air conditioning systems (HVAC Systems) in Columbia, Missouri. This HVAC system consists of three (3... for the HVAC systems, a list of potential manufacturers and project schedule submitted by the City and... HVAC systems available to meet the City's project specifications. The Regional Administrator is...

  12. 75 FR 8351 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... project is for the other two filter beds in the Old Town Water District system. If an alternate domestic... project from $40,019 to $86,405. Based upon information submitted by the Town, its consulting engineer... Unit. The Assistant Administrator of the Office of Administration and Resources Management...

  13. A Collaborative Action Research Project in the Kindergarten: Perspectives and Challenges for Teacher Development through Internal Evaluation Processes

    ERIC Educational Resources Information Center

    Galini, Rekalidou; Efthymia, Penderi

    2010-01-01

    Background: Collaborative action research provides teachers with the framework and methodology to reflect upon their work and take action with regard to specific concerns and situations in their classrooms. Within this approach, internal evaluation could be a useful tool to help teachers develop critical thinking about their work by locating areas…

  14. 75 FR 5585 - Notice of a Regional Project Waiver of Section 1605 (Buy American Requirement) of the American...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... recover waste heat from the sludge incineration operation at the ACSD's North Plant wastewater treatment... wastewater treatment plant (WWTP) waste heat recovery and on-site electricity generation project....

  15. California Emergency Drought Projects Waiver Pursuant to Section 436 of P.L. 113-76, Consolidated Appropriations Act

    EPA Pesticide Factsheets

    Waiver request of the American Iron and Steel requirement of the Consolidated Appropriations Act of 2014 by the California Drinking Water State Revolving Fund for the use of non-domestic iron or steel for short-term emergency projects.

  16. 76 FR 2683 - Notice of a Project Waiver of Section 1605: (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... convey recycled water to serve customers in the 1430 and 1630 pressure zones. Project specifications... pipeline profiles to accommodate larger valves. Alternative ARV valves that must be buried would...

  17. Definite Project Report for Section 205 Flood Control, Illinois River, Liverpool, Illinois, with Final Environmental Impact Statement

    DTIC Science & Technology

    1989-10-01

    Liverpool. Business/Industrial Project would enhance com- No change. Activity mercial viability of study area. Displacement of Farms No farmsteads would be...Liverpool would be more attractive for the establishment of new businesses or the expansion of existing businesses. 12. Farm Displacement - No...exist for any of the plant species within the project area, and no impacts are anticipated to occur. Two animal species are listed for Fulton County

  18. 76 FR 18218 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... Reinvestment Act of 2009 (ARRA) to Salt Lake City, UT AGENCY: Environmental Protection Agency (EPA). ACTION... satisfactory quality to Salt Lake City, UT for three vertical linear motion mixers to be installed in the City... review and recommendation of EPA Region 8's Technical & Financial Services Unit. Salt Lake City...

  19. 76 FR 12217 - Exempt Discretionary Program Grants (Section 5309) for Urban Circulator Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Federal Transit Administration Exempt Discretionary Program Grants (Section 5309) for Urban Circulator Systems AGENCY: Federal Transit Administration (FTA), DOT. ] ACTION: Urban Circulator Systems Announcement of Project Selections. SUMMARY: The U.S. Department of Transportation's (DOT) Federal...

  20. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA (Environmental Protection Agency) standards (40 CFR Part 192)

    SciTech Connect

    Not Available

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs.

  1. Action Research: Rethinking Lewin.

    ERIC Educational Resources Information Center

    Dickens, Linda; Watkins, Karen

    1999-01-01

    Explores both historical and contemporary definitions of action research. Describes the process and goals of action research in the tradition of Lewin. Presents a case study of an action-research project involving two teams in a high-technology corporation that depicts the process in action. (Author/CCM)

  2. DOD Task Force for Business and Stability Operations: Actions Needed to Establish Project Management Guidelines and Enhance Information Sharing

    DTIC Science & Technology

    2011-07-01

    requirements to establish metrics, and monitoring and evaluation processes. As a result, the Task Force does not have the framework needed to ensure a...requirements to establish project metrics, monitoring and evaluation processes, and the type of project information that should be collected and documented...metrics, monitoring and evaluation processes, or how program managers should maintain project information. Standards for Internal Control in the

  3. 75 FR 25243 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... supplied by ABS USA of Meriden, Connecticut, are manufactured in Sweden, and meet Auburn's performance... bearing turbo-compressors that are manufactured in Sweden. Section 1605 of the ARRA requires that none...

  4. Impact of Energy Policy Act of 2005 Section 206 Rebates on Consumers and Renewable Energy Consumption, With Projections to 2010

    EIA Publications

    2006-01-01

    The Energy Information Administration (EIA), with the agreement of the Department, interpreted section 206(d) as calling for a listing of the types of renewable fuels available today, and a listing of those that will be available in the future based on the incentives provided in section 206(d). This report provides that information, and also provides information concerning renewable energy equipment and renewable energy consumption.

  5. 76 FR 62404 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-07

    ... Reuse Project--Waste Water Treatment Facility. The required carbon steel pipe fittings and appurtenances... the proposed waste water treatment system. EPA has also evaluated the City's request to determine if... of the EPA Region 6, Water Quality Protection Division. The City has provided...

  6. 76 FR 17857 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... City's Osage Treatment Plant, which pumps water out of the wet well of the City's water treatment plant. Because the pump will be submerged in potable drinking water, the project specifications require the pump... be used for given pump parts. (1) Cast iron: The pump case, motor housing, and impeller....

  7. 75 FR 6389 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... for a separate waiver based on project specific circumstances. The City's proposed wastewater... its September 28, 2009 request, as part of the improvements to the wastewater treatment facility... design and performance of a sludge dewatering unit as part of its wastewater treatment plant...

  8. 75 FR 5564 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... circumstances. The District's proposed wastewater treatment facility improvements will include a replacement of... waiver request, as part of the improvements to the wastewater treatment facility. DATES: Effective Date... dewatering unit as part of its wastewater treatment plant improvement project. The purchase of the new...

  9. 76 FR 38164 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... Blue Lake Wastewater Treatment Plant located in Shakopee, Minnesota. This is a project- specific waiver... StrainPress SC-4 pressurized in-line sludge screen for the Blue Lake Wastewater Treatment Plant Solids... Parkson screens at the facility, and a third screen is needed to accommodate increased wastewater...

  10. 76 FR 11193 - Notice of a Project Waiver of Section 1605 (Buy American Requirements) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-01

    ... Heating, Ventilation, Air Conditioning (HVAC) equipment for a hospital renovation and expansion project... manufactured only by Daikin and SkyAir of Japan and Thailand, respectively. This determination is based on the... purchase of a Daikin RXS/FTXS (wall mounted indoor unit) HVAC unit and SkyAir FCQ/RZQ...

  11. The Effects of Content and Language Integrated Learning in European Education: Key Findings from the Andalusian Bilingual Sections Evaluation Project

    ERIC Educational Resources Information Center

    Lorenzo, Francisco; Casal, Sonia; Moore, Pat

    2010-01-01

    Content and Language Integrated Learning (CLIL) represents an increasingly popular pedagogic approach that has evolved in response to the recognised need for plurilingual competence in Europe. In this article, we present key findings from one of the first large-scale, multidimensional CLIL evaluation projects. We begin by outlining the emergence…

  12. 75 FR 10258 - Notice of a Project Waiver of Section 1605: (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... Vacuum (ARV) Valves manufactured by A.R.I. in Israel, for Project C-06-5176-110 and C-06-5176-130 funded... rubber seal for the vacuum component to dry out and leak over time. The 316SS float for the ARI...

  13. 75 FR 79374 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... submersible well pump as part of the construction of a new bedrock well field and raw water transmission line... manufactured submersible well pumps available to meet its proposed project specifications. The Regional... a 3 inch diameter submersible well pump by the District, as specified in its October 19,...

  14. 76 FR 80369 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ..., DE (``County''), for the purchase of one ductless split heating/air conditioning (HVAC) system... heating/air conditioning system (HVAC) for Pump Station No. 326. EPA has evaluated the County's basis for... heat pump systems. The ARRA funded project is for construction of the Town of Millsboro, Oak...

  15. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... materials; (6) A change in land cover on major ground water infiltration areas when the amount of land that... the project would affect the quantity or quality of ground or surface waters, or fish and wildlife... facilities of Federal, state and local agencies such as highways, buildings and other public works...

  16. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... materials; (6) A change in land cover on major ground water infiltration areas when the amount of land that... the project would affect the quantity or quality of ground or surface waters, or fish and wildlife... facilities of Federal, state and local agencies such as highways, buildings and other public works...

  17. Employment Action Center's Demonstration Older Worker Project. Operated June 1, 1983 through November 31, 1983. Final Outcome Report.

    ERIC Educational Resources Information Center

    Henry, Ann; Teschendorf, JoAnn

    The Older Worker Project was conducted to provide employment services to unemployed persons aged 45 and older who live in the western part of the Hennepin County (Minneapolis, Minnesota) area. Although the expected result was permanent employment of the participants, the intention of this demonstration project was to refine service approaches…

  18. Environmental assessment of remedial action at the inactive uraniferous lignite processing sites at Belfield and Bowman, North Dakota. [UMTRA Project

    SciTech Connect

    Beranich, S.; Berger, N.; Bierley, D.; Bond, T.M.; Burt, C.; Caldwell, J.A.; Dery, V.A.; Dutcher, A.; Glover, W.A.; Heydenburg, R.J.; Larson, N.B.; Lindsey, G.; Longley, J.M.; Millard, J.B.; Miller, M.; Peel, R.C.; Persson-Reeves, C.H.; Titus, F.B.; Wagner, L.

    1989-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), to clean up the Belfield and Bowman, North Dakota, uraniferous lignite processing sites to reduce the potential health impacts associated with the residual radioactive materials remaining at these sites. Remedial action at these sites must be performed in accordance with the US Environmental Protection Agency's (EPA) standards promulgated for the remedial action and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of North Dakota. The inactive Belfield uraniferous lignite processing site is one mile southeast of Belfield, North Dakota. The inactive Bowman uraniferous lignite processing site at the former town of Griffin, is seven miles northwest of Bowman, North Dakota and 65 road miles south of Belfield. Lignite ash from the processing operations has contaminated the soils over the entire 10.7-acre designated Belfield site and the entire 12.1-acre designated Bowman site. Dispersion of the ash has contaminated an additional 20.6 acres surrounding the Belfield processing site and an additional 59.2 acres surrounding the Bowman processing site. The proposed remedial action is to relocate the contaminated materials at the Belfield processing site to the Bowman processing/disposal site for codisposal with the Bowman contaminated soils. The environmental impacts assessed in this EA were evaluated for the proposed remedial action and the no action alternative and demonstrate that the proposed action would not significantly affect the quality of the human environment and would be performed in compliance with applicable environmental laws. The no action alternative would not be consistent with the intent of Public Law 95-604 and would not comply with the EPA standards. 48 refs., 10 figs., 7 tabs.

  19. 76 FR 44649 - Notice of Final Federal Agency Actions on Proposed Highway in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... USACE involvement with this project is limited to approving the Section 404 permit for the project. This... notice and all laws under which such actions were taken, including but not limited to: 1. General.... 661- 667(d)]; and Migratory Bird Treaty Act . 5. Historic and Cultural Resources: Section 106 of...

  20. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada, Revision 0

    SciTech Connect

    Matthews, Patrick; Burmeister, Mark

    2014-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 square miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.

  1. Definite Project Report for Section 14. Emergency Streambank Protection, Sangamon River Sewage Treatment Facility, Riverton, Illinois. Revision.

    DTIC Science & Technology

    1987-12-01

    solution under the authority of Section 14 of the 1946 Flood Control Act,&s amended. The proposal for emergency streambank protection presented in...the authority of Section 14 of the 1946 Flood Control Actas amended. The Rock Island District, by letter dated December 29, 1986,inforeed the village...for this report is provided under Se:tion 14 of the 1946 Flood Control Act,approved 24 July 1946(33 U.S.C. 701 R),as amended by the Water Resources

  2. Idaho Completion Project’s Accelerated Retrieval Project Overview of the Pit 4 Non-Time Critical Removal Action

    SciTech Connect

    T. L. Clements; R. E. Arbon; B. D. Preussner

    2005-02-01

    This paper presents an overview of the Accelerated Retrieval Project performed by the Idaho Completion Project at the Idaho National Laboratory (INL). Topics include an overall description of the process and methods that will retrieve, characterize, and certify newly generated transuranic (TRU) waste for disposal at the Waste Isolation Pilot Plant (WIPP). The retrieval and characterization of buried TRU waste presents unique challenges. Innovative approaches developed and discussed are: excavation, RCRA waste sampling, visual examination, and deployment of the WIPP Central Characterization Project mobile systems to the INL.

  3. 75 FR 10866 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... requires water treatment and water quality monitoring. In Section 1605(a) of the Recovery Act, the Buy... determined--as applied to certain water quality treatment and monitoring equipment components to be used in a... second drum filter for aquaculture water treatment. The existing system uses a drum filter...

  4. 75 FR 30828 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... contains a primary component not manufactured in America, at two of its Wastewater Treatment Plants (WWTPs). CVPSD indicates that the MBR treatment process is necessary to achieve the wastewater treatment levels... American-made MBR cassettes to meet its specific wastewater requirements. Section 1605 of the ARRA...

  5. 78 FR 11644 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... eleven sites located in Adair and Cherokee Counties, Oklahoma for the CWSRF wastewater treatment plant... (coir) woven mat to meet its specific wastewater requirements. Section 1605 of ARRA requires that none... requirements for installation of fiber (coir) woven mat at its wastewater treatment plant. The purpose of...

  6. Section 508: Its Effect on States Funded under P.L. 100-407. Q & A. RESNA Technical Assistance Project.

    ERIC Educational Resources Information Center

    RESNA: Association for the Advancement of Rehabilitation Technology, Washington, DC.

    This guide contains questions and answers about Section 508 of the Rehabilitation Act, as amended in 1986 by Public Law 99-506, which required the federal government to establish, in consultation with industry, guidelines to ensure that individuals with disabilities may use electronic office equipment with or without special peripherals. The guide…

  7. Key Issues in Building Design: How to Get Started in Planning a Project. Library Buildings and Equipment Section

    ERIC Educational Resources Information Center

    Dahlgren, Anders C.; Eigenbrodt, Olaf; Latimer, Karen; Romero, Santi

    2009-01-01

    Based on the IFLA (International Federation of Library Associations and Institutions) Library Buildings and Equipment Section's Library Building Guidelines published in 2007, this short publication summarises the key points to take into consideration when designing a new or refurbished library building. The aim of the brochure is not to replace…

  8. The Effect of an Energy Audit Service Learning Project on Student Perceptions of STEM Related Disciplines, Personal Behaviors/Actions towards the Environment, and Stewardship Skills

    NASA Astrophysics Data System (ADS)

    Gullo, Michael

    The purpose of this study was to investigate whether or not service learning could be considered an alternative teaching method in an environmental science classroom. In particular, the results of this research show whether an energy audit service learning project influenced student environmental awareness (knowledge of environmental issues, problems, and solutions), student personal actions/behaviors towards the environment, student perceptions and attitudes of science related careers, and community partnerships. Haines (2010) defines service learning as “a teaching and learning strategy that integrates meaningful community service with instruction and reflection to enrich the learning experience, teach civic responsibility, and strengthen communities” (p. 16). Moreover, service learning opportunities can encourage students to step out of their comfort zone and learn from hands-on experiences and apply knowledge obtained from lectures and classroom activities to real life situations. To add to the growing body of literature, the results of this study concluded that an energy audit service learning project did not have a measureable effect on student perceptions and attitudes of science related careers as compared to a more traditional teaching approach. However, the data from this study did indicate that an energy audit service learning project increased students personal actions/behaviors towards the environment more than a direct teaching approach.

  9. Soils Project Risk-Based Corrective Action Evaluation Process with ROTC 1 and ROTC 2, Revision 0

    SciTech Connect

    Matthews, Patrick; Sloop, Christina

    2012-04-01

    This document formally defines and clarifies the NDEP-approved process the NNSA/NSO Soils Activity uses to fulfill the requirements of the FFACO and state regulations. This process is used to establish FALs in accordance with the risk-based corrective action (RBCA) process stipulated in Chapter 445 of the Nevada Administrative Code (NAC) as described in the ASTM International (ASTM) Method E1739-95 (NAC, 2008; ASTM, 1995). It is designed to provide a set of consistent standards for chemical and radiological corrective actions.

  10. Texas Clean Energy Project: Decision Point Application, Section 2: Topical Report - Phase 1, February 2010-October 2013

    SciTech Connect

    Mattes, Karl

    2013-09-01

    Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the Project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) power plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO2) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) that will be cleaned and further treated so that at least 90 percent of the overall carbon entering the IGCC facility will be captured. The clean syngas will then be divided into two highhydrogen (H2) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the Project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and

  11. Coordinated international action to accelerate genome-to-phenome with FAANG, The Functional Annotation of Animal Genomes project

    Technology Transfer Automated Retrieval System (TEKTRAN)

    We describe the organization of a nascent international effort - the "Functional Annotation of ANimal Genomes" project - whose aim is to produce comprehensive maps of functional elements in the genomes of domesticated animal species....

  12. Mathematical speech and practical action: a case study of the challenges of including mathematics in a school technology project

    NASA Astrophysics Data System (ADS)

    Bungum, Berit; Manshadi, Saeed; Atle Lysne, Dag

    2014-11-01

    This paper presents a case study of how a teacher and nine-year-old students deal with mathematics in a practical technology project. By analysing videotaped dialogues between teacher and a pair of students working on constructing a house model, we identify challenges of meaningful inclusion of mathematics in the project. The dialogues are analysed in terms of an analytical framework where four categories of interaction patterns are combined with two main paradigms of mathematics teaching: the exercise paradigm and landscapes of interaction. The project in itself has a potential for facilitating landscapes of investigation in mathematics teaching. However, we find that the teacher as well as students adheres to the exercise paradigm when mathematics is involved in the activity. Two illustrating episodes from the project are examined and presented in detail in this paper. The findings illustrate that the conceptions teachers and students hold of what mathematics teaching means can act as an obstacle in attempts to realize mathematics teaching in creative and meaningful contexts for young students. We suggest that making the various purposes of a project more explicit may help overcome this obstacle, and that the mathematics involved might be taught in separate sessions in order to form a constructive part of a cross-curricular project.

  13. When Soda Is a Social Justice Issue: Design and Documentation of a Participatory Action Research Project with Youth

    ERIC Educational Resources Information Center

    Noonan, James

    2015-01-01

    Schools are increasingly seen as having a promising role to play in reducing adverse health and wellness outcomes among young people. This paper uses a collaborative action research approach to examine the effects of one school's efforts to change its students' eating habits by implementing a "junk-food free campus." By engaging school…

  14. Creating and Sustaining a Professional Learning Community to Impact Student Achievement on a High School Campus: An Action Research Project

    ERIC Educational Resources Information Center

    Nichols, Dionne DeShall

    2013-01-01

    Professional learning communities (PLCs) have become one of the most talked about ideas in education today. Many K-12 schools are working to become PLCs in the hope that student learning will improve when adults commit themselves to talking collaboratively about teaching and learning and then take action that will improve student learning and…

  15. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado: Remedial action selection report. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1992-10-01

    The Gunnison uranium mill tailings site is just south of the city limits of Gunnison, Colorado, in the south-central part of the state. The entire site covers 61 acres in the valley of the Gunnison River and Tomichi Creek. Contaminated materials at the Gunnison processing site include the tailings pile, covering about 35 acres to an average depth of nine feet and containing 459,000 cubic yards. Ore storage areas and the former mill processing area cover about 20 acres on the south side of the site. The volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 718,900 cubic yards. An interim action was approved by the US Department of Energy to eliminate existing safety hazards to the Gunnison community. These actions, started in September 1991, included demolition of mill buildings and related processing facilities, excavation of two underground storage tanks, removal of asbestos and other hazardous materials from buildings, storage of those materials in a secured area on the site, and improvements of site security.

  16. Projected Life of the SLAC Linac Braze Joints: Braze integrity and corrosion of cooling water hardware on accelerator sections

    SciTech Connect

    Glesener, W.F.; Garwin, E.L.; /SLAC

    2006-07-17

    The objective of this study was to ascertain the condition of braze joints and cooling water hardware from an accelerator section after prolonged use. Metallographic analysis was used to examine critical sites on an accelerator section that had been in use for more than 30 years. The end flange assembly showed no internal operational damage or external environmental effects. The cavity cylinder stack showed no internal operational damage however the internal surface was highly oxidized. The internal surface of the cooling water tubing was uniformly corroding at a rate of about 1 mil per year and showed no evidence of pitting. Tee fitting internal surfaces are corroding at non-uniform rates due to general corrosion and pitting. Remaining service life of the cooling water jacket is estimated to be about 20 years or year 2027. At this time, water supply pressure will exceed allowable fitting pressure due to corrosion of tubing walls.

  17. Challenges of scaling up and of knowledge transfer in an action research project in Burkina Faso to exempt the worst-off from health care user fees

    PubMed Central

    2011-01-01

    Background Systems to exempt the indigent from user fees have been put in place to prevent the worst-off from being excluded from health care services for lack of funds. Yet the implementation of these mechanisms is as rare as the operational research on this topic. This article analyzes an action research project aimed at finding an appropriate solution to make health care accessible to the indigent in a rural district of Burkina Faso. Research This action research project was initiated in 2007 to study the feasibility and effectiveness of a community-based, participative and financially sustainable process for exempting the indigent from user fees. A interdisciplinary team of researchers from Burkina Faso and Canada was mobilized to document this action research project. Results and knowledge sharing The action process was very well received. Indigent selection was effective and strengthened local solidarity, but coverage was reduced by the lack of local financial resources. Furthermore, the indigent have many other needs that cannot be addressed by exemption from user fees. Several knowledge transfer strategies were implemented to share research findings with residents and with local and national decision-makers. Partnership achievements and difficulties Using a mixed and interdisciplinary research approach was critical to grasping the complexity of this community-based process. The adoption of the process and the partnership with local decision-makers were very effective. Therefore, at the instigation of an NGO, four other districts in Burkina Faso and Niger reproduced this experiment. However, national decision-makers showed no interest in this action and still seem unconcerned about finding solutions that promote access to health care for the indigent. Lessons learned The lessons learned with regard to knowledge transfer and partnerships between researchers and associated decision-makers are: i) involve potential users of the research results from the

  18. [How to understand and facilitate return to school of high school students treated for cancer: analysis of a sociology research-action project].

    PubMed

    Rollin, Zoé

    2015-01-01

    Based on a sociology research-action project, this article analyses the specific issue of return to school of high school students with cancer. Three detailed cases, illustrating the global results of the study, are presented to highlight the academic trajectories of these students. This situation has a particular impact on juvenile sociability. Moreover, the education of these students does not comply with French educational standards and is very complex for professionals. Finally, social inequalities in education are reinforced by the experience of serious illness, as pedagogical negotiations are even more complex due to the fact that families are not familiar with school practices.

  19. Thin Sections

    PubMed Central

    Peachey, Lee D.

    1958-01-01

    Knowledge of the thickness of sections is important for proper interpretation of electron micrographs. Therefore, the thicknesses of sections of n-butyl methacrylate polymer were determined by ellipsometry, and correlated with the color shown in reflected light. The results are: gray, thinner than 60 mµ; silver, 60 to 90 mµ; gold, 90 to 150 mµ; purple, 150 to 190 mµ; blue, 190 to 240 mµ; green, 240 to 280 mµ; and yellow, 280 to 320 mµ. These results agree well with optical theory and with previous published data for thin films. Sections, after cutting, are 30 to 40 per cent shorter than the face of the block from which they were cut. Only a small improvement results from allowing the sections to remain in the collecting trough at room temperature. Heating above room temperature, however, reduces this shortening, with a corresponding improvement in dimensions and spatial relationships in the sections. When the thickness of the section is considered in interpreting electron micrographs instead of considering the section to be two-dimensional, a more accurate interpretation is possible. The consideration of electron micrographs as arising from projections of many profiles from throughout the whole thickness of the section explains the apparent lack of continuity often observed in serial sections. It is believed that serial sections are actually continuous, but that the change in size of structure through the thickness of one section and the consideration of only the largest profile shown in the micrograph can account for the lack of continuity previously observed. PMID:13549493

  20. The Wholistic Health Center Project: an action-research model for providing preventive, whole-person health care at the primary level.

    PubMed

    Tubesing, D A; Holinger, P C; Westberg, G E; Lichter, E A

    1977-03-01

    The Wholistic Health Center action-research project is designed to stimulate new approaches for rectifying a variety of maladies present in the nation's primary health care delivery system. In response to the call for an increase in health education programs, for availability of care in early stages of illness, for care focused on life stress factors, and for better coordination of care-the church-based Wholistic Health Centers utilize a unique multidisciplinary teamwork approach for diagnosis and treatment planning. The patient is involved as an active participant in this process. In conjunction with the University of Illinois, Department of Preventive Medicine and Community Health, the project has developed from its inception as a free clinic in Springfield, Ohio, to the establishment of two potentially self-supporting centers in middle and upper-income suburbs west of Chicago, Illinois.