Science.gov

Sample records for action project section

  1. The Take Action Project

    ERIC Educational Resources Information Center

    Boudreau, Sue

    2010-01-01

    The Take Action Project (TAP) was created to help middle school students take informed and effective action on science-related issues. The seven steps of TAP ask students to (1) choose a science-related problem of interest to them, (2) research their problem, (3) select an action to take on the problem, (4) plan that action, (5) take action, (6)…

  2. Peer Observation Action Research Project

    ERIC Educational Resources Information Center

    Sandt, Fred-Ole

    2012-01-01

    This paper outlines the initial findings of an action research project that focuses on the possible contribution of peer observation to a more collaborative environment and teachers' professional growth at The University High School. The research component played a significant part as previous attempts to change the culture at the school were…

  3. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... and classification of United States lands as water power sites and other actions under section 24...

  4. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... and classification of United States lands as water power sites and other actions under section 24...

  5. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... and classification of United States lands as water power sites and other actions under section 24...

  6. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... and classification of United States lands as water power sites and other actions under section 24...

  7. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... and classification of United States lands as water power sites and other actions under section 24...

  8. Action Learning: Student Community Service Projects.

    ERIC Educational Resources Information Center

    Aronstein, Laurence W.; Olsen, Edward G.

    By engaging students in community service projects, action learning uses resources of the real world to give students opportunities to participate in performing tasks and making decisions that confront societal problems. Such projects should be decided on after a study of the needs of the community. After a project is selected, all relevant…

  9. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  10. A Telecommunications-Infused Community Action Project.

    ERIC Educational Resources Information Center

    March, Thomas; Puma, Jessica

    1996-01-01

    The Nonprofit Prophets, a telecommunications-infused community action project, was designed for high school students. Students were teamed with a nonprofit organization and produced videoconferences or Web sites for them. Although specific skills were acquired, students also gained confidence and self-esteem as well as a belief that they…

  11. Utah Character Education Action Research Projects.

    ERIC Educational Resources Information Center

    Utah State Office of Education, Salt Lake City.

    This booklet contains a synopsis of eight action research projects undertaken by educators from various Utah public schools presented at a series of workshops. Twenty-seven educators representing 19 schools, 9 school districts, and the Utah State Office of Education (USOE) attended the series of 4 full-day workshops held during October, February,…

  12. realfriends: A Student Social Action Project

    ERIC Educational Resources Information Center

    Van Zoost, Steven

    2012-01-01

    "realfriends" is a social action project created by Grade 12 English students in Windsor, Nova Scotia. Its purpose was to create a face-to-face social network that would help change the school climate into a more social space. Interest in socializing is nothing new for teenagers, but these students articulated a worry that people their age may be…

  13. Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA project

    SciTech Connect

    Not Available

    1989-09-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

  14. Volatile organic compound remedial action project

    SciTech Connect

    1991-12-01

    This Environmental Assessment (EA) reviews a proposed project that is planned to reduce the levels of volatile organic compound (VOC) contaminants present in the Mound domestic water supply. The potable and industrial process water supply for Mound is presently obtained from a shallow aquifer via on-site production wells. The present levels of VOCs in the water supply drawn from the on-site wells are below the maximum contaminant levels (MCLs) permissible for drinking water under Safe Drinking Water Act (SDWA; 40 CFR 141); however, Mound has determined that remedial measures should be taken to further reduce the VOC levels. The proposed project action is the reduction of the VOC levels in the water supply using packed tower aeration (PTA). This document is intended to satisfy the requirements of the National Environmental Policy Act (NEPA) of 1969 and associated Council on Environmental Quality regulations (40 CFR parts 1500 through 1508) as implemented through U.S. Department of Energy (DOE) Order 5440.1D and supporting DOE NEPA Guidelines (52 FR 47662), as amended (54 FR 12474; 55 FR 37174), and as modified by the Secretary of Energy Notice (SEN) 15-90 and associated guidance. As required, this EA provides sufficient information on the probable environmental impacts of the proposed action and alternatives to support a DOE decision either to prepare an Environmental Impact Statement (EIS) or issue a Finding of No Significant Impact (FONSI).

  15. The Action-Project Method in Counseling Psychology

    ERIC Educational Resources Information Center

    Young, Richard A.; Valach, Ladislav; Domene, Jose F.

    2005-01-01

    The qualitative action-project method is described as an appropriate and heuristic qualitative research method for use in counseling psychology. Action theory, which addresses human intentional, goal-directed action, project, and career, provides the conceptual framework for the method. Data gathering and analysis involve multiple procedures to…

  16. Community Action Projects: Applying Biotechnology in the Real World

    ERIC Educational Resources Information Center

    Nguyen, Phuong D.; Siegel, Marcelle A.

    2015-01-01

    Project-based learning and action research are powerful pedagogies in improving science education. We implemented a semester-long course using project-based action research to help students apply biotechnology knowledge learned in the classroom to the real world. Students had several choices to make in the project: working individually or as a…

  17. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  18. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  19. An Action-Research Project: Community Lead Poisoning Prevention

    ERIC Educational Resources Information Center

    Rajaram, Shireen S.

    2007-01-01

    This action-research project focused on gathering data on awareness of lead poisoning, as well as disseminating information on lead poisoning prevention in a metropolitan midwestern city. This project reflects an action-research approach to service learning and was in collaboration with a grass-roots organization. This paper outlines the daunting…

  20. Critical Literacy for School Improvement: An Action Research Project

    ERIC Educational Resources Information Center

    Cooper, Karyn; White, Robert E.

    2008-01-01

    This article provides an overview of the integrative process of initiating an action research project on literacy for students "at risk" in a Canadian urban elementary school. As the article demonstrates, this requires development of a school-wide framework, which informs the action research project and desired outcomes, and a shared ownership of…

  1. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  2. 15 CFR 2006.0 - Submission of petitions requesting action under section 301.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... FOR ACTION UNDER SECTION 301 OF THE TRADE ACT OF 1974, AS AMENDED § 2006.0 Submission of petitions requesting action under section 301. (a) Section 301 of the Trade Act of 1974, as amended (the “Trade Act... restrict United States commerce. Section 302 of the Trade Act provides for petitions to be filed with...

  3. The James Bay Project: Reaction or Action?

    ERIC Educational Resources Information Center

    Mackwood, Gae

    1991-01-01

    Discusses the plan to restructure northern Quebec's landscape through the James Bay hydroelectric project. Suggests that the project offers opportunities to study development versus preservation, federal versus provincial powers, and the conflict between business and Native communities. Explores the need to teach students to care about social…

  4. Indigenizing Teacher Education: An Action Research Project

    ERIC Educational Resources Information Center

    Kitchen, Julian; Raynor, Marg

    2013-01-01

    This action research report focuses on a new elective course entitled "Indigenizing Education: Education for/about Aboriginal Peoples" that was developed and taught by two teacher educators--one Euro-Canadian and the other Metis. The purpose of the course was to increase understanding of Indigenous peoples and of the impact of…

  5. 15 CFR 2006.0 - Submission of petitions requesting action under section 301.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Submission of petitions requesting action under section 301. 2006.0 Section 2006.0 Commerce and Foreign Trade Regulations Relating to... FOR ACTION UNDER SECTION 301 OF THE TRADE ACT OF 1974, AS AMENDED § 2006.0 Submission of...

  6. Project WILD--From Awareness to Action!

    ERIC Educational Resources Information Center

    Charles, Cheryl; Schafer, Rudy

    1984-01-01

    Discusses goals of Project WILD, an environmental and conservation program emphasizing wildlife. Includes instructions for using and sample of "dilemma cards" which allow students to read, discuss, make judgments, and write about hypothetical dilemmas concerning wildlife and/or natural resources. (BC)

  7. The Biodiversity Community Action Project: An STS Investigation

    ERIC Educational Resources Information Center

    Aidin, Amirshokoohi; Mahsa, Kazempour

    2010-01-01

    The Biodiversity Community Action Project is a stimulating and vigorous project that allows students to gain an in-depth understanding of the interconnection between organisms and their environments as well as the connection of science to their lives and society. It addresses key content standards in the National Science Education Standards and…

  8. Action Research Projects in Pre-Service Teacher Education

    ERIC Educational Resources Information Center

    Clayton, Courtney; Meadows, George

    2013-01-01

    Classroom-centered Action Research Projects are an integral component of the M.S. in Elementary Education Program at the University's (pseudonym) College of Education. This article provides a summary and discussion of the projects completed by students in the Science, Technology, Literacy and English Language Learner Specializations of the…

  9. Project InterActions: A Multigenerational Robotic Learning Environment

    ERIC Educational Resources Information Center

    Bers, Marina U.

    2007-01-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both…

  10. Literacy Learning within Community Action Projects for Social Change

    ERIC Educational Resources Information Center

    Wright, Dana E.; Mahiri, Jabari

    2012-01-01

    This case study describes the literacy development of a struggling reader over a seven-month period as he engaged in a youth-led participatory action research (PAR) project. The project's goal was for youth participants to develop a proposal for productive change in their local community and present it to community stakeholders. The study focused…

  11. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  12. Getting to social action: the Youth Empowerment Strategies (YES!) project.

    PubMed

    Wilson, Nance; Minkler, Meredith; Dasho, Stefan; Wallerstein, Nina; Martin, Anna C

    2008-10-01

    This article describes the social action component of the Youth Empowerment Strategies (YES!) project funded by the Centers for Disease Control and Prevention through its community-based prevention research (CBPR) initiative. YES! is designed to promote problem-solving skills, social action, and civic participation among underserved elementary and middle school youth. The after-school program focuses on identifying and building youths' capacities and strengths as a means of ultimately decreasing rates of alcohol, tobacco, and other drug use and other risky behaviors. The article discusses the conceptual models of risk and intervention and factors contributing to successful social action work, including group dynamics, intragroup leadership, facilitator skills, and school-community contexts. Attention is focused on how the nature of the projects themselves played a key role in determining the likelihood of experiencing success. Implications and recommendations for other youth-focused empowerment education projects are discussed, including the effective use of Photovoice in such projects.

  13. Yes, I Can: Action Projects To Resolve Equity Issues in Educational Computing. A Project of ECCO, the Educational Computer Consortium of Ohio.

    ERIC Educational Resources Information Center

    Fredman, Alice, Ed.

    This book presents reports on selected "local action" projects that were developed as part of the Equity in Technology Project, which was inaugurated in 1985 by the Educational Computer Consortium of Ohio (ECCO). The book is organized into three sections, one for each of the populations targeted by the project. An introduction by Alice Fredman…

  14. Information for action: the Clearinghouse project.

    PubMed

    Gibbons, G

    1998-02-01

    This document summarizes the activities of the American Public Health Association International Clearinghouse that operated with funding from the US Agency for International Development for 16 years beginning in 1979. The Clearinghouse was established to improve access to information on infant feeding and maternal nutrition for health practitioners and decision-makers in Africa, Asia, and Latin America. By 1996, the Clearinghouse had created a substantial and accessible resource for USAID, and its activities included 1) developing an international center for information and materials on maternal and child nutrition and related issues in developing countries, 2) sharing lessons learned through a publication of a regular bulletin ("Mothers and Children"), 3) training staff from field-based organizations on information production and management, and 4) establishing a network of national and regional nutrition and health-related resource centers to increase access to locally published and unpublished information. Thus, the Clearinghouse was more than a library or distribution center; it identified key materials, repackaged information to increase accessibility, and monitored information use. Although the Clearinghouse project ended in 1996, the website on women's rights to maternity protection continues to provide access to information and to encourage dialogue and networking. The lessons learned from the project lead to the conclusions that users' needs must be the basis for increasing information access, that local capacity must be increased through new technologies and traditional methods, and that information resources must be used strategically to ensure equitable access.

  15. Multilingual Affordances in a Swedish Preschool: An Action Research Project

    ERIC Educational Resources Information Center

    Ljunggren, Åsa

    2016-01-01

    This article summarizes the work and the main findings of an action research project that was conducted in an early childhood education and care setting in the city of Malmö, Sweden in the autumn of 2013 and spring 2014. Rönnerman's model (Aktionsforskning i praktiken: förskola och skola på vetenskaplig grund [Action research in practice:…

  16. 16 CFR 1116.11 - Reports of civil actions under section 37 not admissions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... not admissions. 1116.11 Section 1116.11 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS REPORTS SUBMITTED PURSUANT TO SECTION 37 OF THE CONSUMER PRODUCT SAFETY ACT § 1116.11 Reports of civil actions under section 37 not admissions. Pursuant to section...

  17. 7 CFR 6.2 - Responsibility for actions under section 22 and section 8(a).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... under section 22 of the Agricultural Adjustment Act of 1933, as amended, and section 8(a) of the Trade Agreements Extension Act of 1951 is assigned to the Administrator, Foreign Agricultural Service (referred...

  18. 7 CFR 6.2 - Responsibility for actions under section 22 and section 8(a).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... under section 22 of the Agricultural Adjustment Act of 1933, as amended, and section 8(a) of the Trade Agreements Extension Act of 1951 is assigned to the Administrator, Foreign Agricultural Service (referred...

  19. Uranium Mill Tailings Remedial Action (UMTRA) Surface Project: Project plan. Revision 1

    SciTech Connect

    Not Available

    1993-08-11

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) [Public Law (PL) 95-604, 42 United States Code (USC) 7901], hereinafter referred to as the ``Act,`` authorizes the US Department of Energy (DOE) to stabilize and control surface tailings and ground water contamination. To fulfill this mission, the DOE has established two projects under the Uranium Mill Tailings Remedial Action (UMTRA) Project Office. The Ground Water Project was established in April 1991 as a major project and a separate project plan will be prepared for that portion of the mission. This project plan covers the UMTRA Surface Project, a major system acquisition (MSA).

  20. Culminating Experience Action Research Projects, Volume 13, Fall 2008

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  1. The Role of Facilitators in Project Action Learning Implementation

    ERIC Educational Resources Information Center

    Cao, Rui; Chuah, Kong Bieng; Chao, Yiu Chung; Kwong, Kar Fai; Law, Mo Yin

    2012-01-01

    Purpose: This paper addresses the importance of a more proactive role of organizational learning (OL) facilitators, learning motivation reinforcer, through a two-part longitudinal study in a case company. The first part of this study aims to investigate and analyze some unexpected challenges in the project action learning-driven (PAL) OL…

  2. Culminating Experience Action Research Projects, Volume 3, Spring 2003.

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Moyer, Peggy S., Ed.

    This document presents the course syllabus for Education 590 Culminating Experience at the University of Tennessee at Chattanooga's teacher licensure program. It also includes action research projects from spring 2003: "'To Track or Untrack...That Is the Question'" (Sarah Armes); "Providing Urban Students with the Motivation to Succeed in School"…

  3. Health Activities Project (HAP): Heart Fitness and Action Module.

    ERIC Educational Resources Information Center

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) learning packet are activities for children in grades 5-8. Design of the activities centers around the idea that students can control their own health and safety. Within the Heart Fitness and Action Module are teacher and student folios describing five activities which involve students in…

  4. Culminating Experience Action Research Projects, Volume 17, Fall 2010

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 5900 Culminating…

  5. Culminating Experience Action Research Projects, Volume 10, Spring 2007

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Deaver, Sharon R., Ed.

    2008-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  6. Culminating Experience Action Research Projects, Volume 5, Spring 2004

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Bothman, Susan M., Ed

    2005-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  7. Culminating Experience Action Research Projects, Volume 7, Fall 2005

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Fritch, Sarah C., Ed.

    2007-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  8. Blogging across the Curriculum: An Action Research Project

    ERIC Educational Resources Information Center

    Nichols, Andrea

    2012-01-01

    "Blogging across the curriculum: Integrating blogging in the elementary classroom" is an Action Research Project that sought to explore the level of engagement in the writing process by students in grades 3, 4 & 5 while blogging across the curriculum. Blogging took place in homeroom classrooms as well as in the school's math, science and…

  9. Culminating Experience Action Research Projects, Volume 9, Fall 2006

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Ezell, Benjamin T., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  10. Strategic Approaches to Practice: An Action Research Project

    ERIC Educational Resources Information Center

    Burwell, Kim; Shipton, Matthew

    2013-01-01

    The importance of personal practice for instrumentalists and vocalists is well established among researchers, and axiomatic for practitioners. This paper reports on a phase of an action research project, investigating student approaches to personal practice. Following a preliminary questionnaire study, a residential clinic was conducted by…

  11. Culminating Experience Action Research Projects, Volume 14, Spring 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  12. Play and Literacy: A Collaborative Action Research Project in Preschool

    ERIC Educational Resources Information Center

    Einarsdottir, Johanna

    2014-01-01

    The article describes a collaborative action research in a preschool in Reykjavik. The participants were two preschool teachers who collaborated with researchers at the University of Iceland. The project was set up as a professional development course for the teachers. Emphasis was placed on continuity in children's education, integration of…

  13. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse.

    PubMed

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course.

  14. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse

    PubMed Central

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus “alcohol culture.” Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one’s community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course. PMID:27385923

  15. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  16. Beyond You and Me: Stories for Collective Action and Learning? Perspectives from an Action Research Project

    ERIC Educational Resources Information Center

    Gearty, Margaret

    2015-01-01

    This paper explores the combination of storytelling and reflective action research as a means to effect change and learning within and across communities and organizations. Taking the complex challenge of "pro-environmental behaviour change" as an example, the paper reflects on the experiences of a pilot project run for the UK government…

  17. Reflections on an Action Research Project in Teacher Education: The Emancipatory Project under Scrutiny

    ERIC Educational Resources Information Center

    Christiansen, Iben

    2008-01-01

    The Advanced Certificate of Education (ACE) specialisation in mathematics (for the FET) at the University of KwaZulu-Natal includes a module on professional practice in mathematics education. As part of this module students complete an action research project on their own teaching. This article describes both the progression of one action research…

  18. MTR, TRA603. LONGITUDINAL SECTION SHOWS EAST/WEST SECTION AND PROJECTION OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MTR, TRA-603. LONGITUDINAL SECTION SHOWS EAST/WEST SECTION AND PROJECTION OF CANAL BEYOND EAST WALL OF BUILDING; PIPE TUNNEL, BULKHEAD LOCATIONS IN CANAL, SWING-OUT ISOLATION GATE, TUNNEL HATCH UNDER ROADWAY; SUB-PILE AND RABBIT CANAL SECTIONS; BALCONY CONTROL AND INSTRUMENT ROOMS; CATWALK, MAIN AND AUXILIARY HOISTS. AIR COMPRESSOR BUILDING (TRA-626) TO THE NORTH. BLAW-KNOX BKC-3150-3-5, 3/1950. INL INDEX NO. 531-0603-00-098-100004, REV. 7. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  19. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  20. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  1. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  2. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  3. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  4. California Freshwater Shrimp Project: An Eco-Action Project with Real Life Learning.

    ERIC Educational Resources Information Center

    Rogers, Laurette H.

    The California Freshwater Shrimp Project is an example of a student-initiated, eco-action project. Students, from a fourth grade class in the Ross Valley School District in San Rafael, California, were linked to their community and environment through their work in rehabilitating habitat and educating the public. The paper gives an overview of a…

  5. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    SciTech Connect

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  6. Projects of the LIADA Teaching and Popularization Section

    NASA Astrophysics Data System (ADS)

    Bretones, P. S.; Oliveira, V. C.

    2006-08-01

    The goal of this work is to present an analysis of the projects developed by the Teaching and Popularization Section of the Liga Ibero-Americana de Astronomía (LIADA). We first present a brief outline of the LIADA and its objectives, with emphasis in the attempts to organize, conduct and stimulate the collaboration between the professional and amateur astronomers in Latin-America. The Section is based in Brazil and counts with the support of 16 coordinators from most Latin-American countries. Presently several projects are being developed as: astronomy to the schools, oppositions, conjuctions, eclipses and transits. The observational projects are communicated at the home page of the Section (http://www.iscafaculdades.com.br/liada) and aim to attract the attention of the general public, teachers and students to encourage the observation. The participants gather the astronomical data at the home page, supplemented by the aid of local coordinators and spontaneous collaborators. The strategy is to circulate important support material and open a discussion forum about each of the observed phenomena to enhance their public consideration and visibility. We have analyzed the records and present an evaluation of the projects executed jointly with other institutions and individuals, their importance for scientific education, the nomination and relationship with the coordinators, the difficulties with written reports, the need of a dynamical maintenance of the home page, the question of the language, the establishment of a useful communications network and the visibility of the LIADA activities. We conclude with a critical assessment of these activities, their strengths and weaknesses as observed by us and future projects of astronomy education.

  7. Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site

    SciTech Connect

    DOE /NV

    1998-11-01

    This Corrective Action Investigation Plan (CAIP) describes the US Department of Energy's (DOE's) continued environmental investigation of the subsurface Project Shoal Area (PSA) Corrective Action Unit (CAU) 447. The PSA is located in the Sand Springs Mountains in Churchill County, Nevada, about 48 kilometers (km) (30 miles [mi]) southeast of Fallon, Nevada. Project Shoal was part of the Vela Uniform Program which was conducted to improve the US' ability to detect, identify, and locate underground nuclear detonations. The test consisted of detonating a 12-kiloton nuclear device deep underground in granitic rock to determine whether seismic waves produced by an underground nuclear test could be differentiated from seismic waves produced by a naturally occurring earthquake. The test was a joint effort conducted by the US Atomic Energy Commission (AEC) and the US Department of Defense (DoD) in October 1963 (AEC, 1964).

  8. The Research to Action Project: Applied Workplace Solutions for Nurses.

    PubMed

    Silas, Linda

    2012-03-01

    The number of new nurses entering the profession has increased, but the need to retain nurses in the profession continues to be a critical priority. The consequences of the nursing shortage are reflected in continued high levels of overtime, absenteeism and turnover. The Canadian Federation of Nurses Unions (CFNU), in partnership with the Canadian Nurses Association, the Canadian Healthcare Association and the Dietitians of Canada, initiated the project Research to Action: Applied Workplace Solutions for Nurses (RTA). The RTA initiative comprised research-based pilot projects, implemented in 10 jurisdictions across the country, that aimed to improve workplaces and increase the retention and recruitment of nurses. Unions, employers, governments, universities and professional associations came together in an unprecedented show of collaboration. Lessons and knowledge were shared among the projects, which were evaluated for their viability in other jurisdictions and professions. The pilots led to increased leadership, engagement and professional development, and decreased overtime, absenteeism and turnover. PMID:22398473

  9. Project InterActions: A Multigenerational Robotic Learning Environment

    NASA Astrophysics Data System (ADS)

    Bers, Marina U.

    2007-12-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both parents and children about the mechanical and programming aspects involved in robotics, as well as to initiate them in a learning trajectory with and about technology. Results from this project address different ways in which parents and children learn together and provide insights into how to develop educational interventions that would educate parents, as well as children, in new domains of knowledge and skills such as robotics and new technologies.

  10. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    SciTech Connect

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  11. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1A: Citations with abstracts, sections 1 through 9

    SciTech Connect

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  12. 76 FR 2949 - Notice of Final Federal Agency Actions on Proposed Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... Construction Project in the State of Washington. Those actions grant approval for the project. DATES: By this... Construction Project. The project includes constructing pontoons sufficient to replace the existing traffic... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Project in...

  13. UMTRA Surface Project management action process document. Final report: Revision 1

    SciTech Connect

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

  14. Project Charter (MSA-143). [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1986-07-01

    Public Law 95-604, The Uranium Mill Tailings Radiation Control Act of 1978'' as amended assigns to DOE, other Federal agencies, and involved States and Indian tribes, responsibilities for remedial actions at 22 inactive uranium mill tailings sites listed in the Act, and for any other sites designated by the Secretary prior to November 8, 1979. The objective of the UMTRA Project is to provide remedial action at the mill tailings sites and associated vicinity properties in order to stabilize and control the tailings in a safe and environmentally sound manner and to eliminate potential health hazards caused by residual levels of uranium decay products that exceed EPA standards. A total of 24 uranium mill tailings sites. This Project Charter delineates the respective responsibilities and authorities of (The Office of Nuclear Energy) (NE) and (Albuquerque Operations Office) (AL), and defines the terms and conditions for management of the UMTRA Project. Supplementary Project management documents which have been and are being developed pursuant to this Charter include a Project Plan (PP), a Project Management Plan (PMP) and other plans governing the accomplishment of the Project mission Evolution of the program will require updates of the Project Plan and Project Management Plan.

  15. Using Collaborative Action Learning Projects to Increase the Impact of Management Development

    ERIC Educational Resources Information Center

    Lyso, Ingunn Hybertsen; Mjoen, Kristian; Levin, Morten

    2011-01-01

    This article aims to contribute to the field of human resource development by exploring the conditions that influence the organizational impact of action learning projects. Many organizations use such projects as an integral part of their management development programs. Past research on action learning projects has shown how balancing action and…

  16. A low complexity reweighted proportionate affine projection algorithm with memory and row action projection

    NASA Astrophysics Data System (ADS)

    Liu, Jianming; Grant, Steven L.; Benesty, Jacob

    2015-12-01

    A new reweighted proportionate affine projection algorithm (RPAPA) with memory and row action projection (MRAP) is proposed in this paper. The reweighted PAPA is derived from a family of sparseness measures, which demonstrate performance similar to mu-law and the l 0 norm PAPA but with lower computational complexity. The sparseness of the channel is taken into account to improve the performance for dispersive system identification. Meanwhile, the memory of the filter's coefficients is combined with row action projections (RAP) to significantly reduce computational complexity. Simulation results demonstrate that the proposed RPAPA MRAP algorithm outperforms both the affine projection algorithm (APA) and PAPA, and has performance similar to l 0 PAPA and mu-law PAPA, in terms of convergence speed and tracking ability. Meanwhile, the proposed RPAPA MRAP has much lower computational complexity than PAPA, mu-law PAPA, and l 0 PAPA, etc., which makes it very appealing for real-time implementation.

  17. NIFFTE Time Projection Chamber for Fission Cross Section Measurements

    NASA Astrophysics Data System (ADS)

    Castillo, Ryan; Neutron Induced Fission Fragment Tracking Experiment Collaboration

    2011-10-01

    In order to design safer and more efficient Generation IV nuclear reactors, more accurate knowledge of fission cross sections is needed. The goal of the Time Projection Chamber (TPC) used by the Neutron Induced Fission Fragment Tracking Experiment (NIFFTE) collaboration is to measure the cross sections of several fissile materials to within 1% uncertainty. The ability of the TPC to produce 3D ``pictures'' of charged particle trajectories will eliminate unwanted alpha particles in the data. Another important source of error is the normalization of data the U-235 standard. NIFFTE will use the H(n,n)H reaction instead, which is known to better than 0.2%. The run control and monitoring system will eventually allow for nearly complete automation and off-site monitoring of the experiment. This presentation will cover the need for precision measurements and an overview of the experiment. This work was supported by the U.S. Department of Energy Division of Energy Research.

  18. 75 FR 3464 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... AGENCY Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The EPA is hereby granting a waiver of the Buy... information provided, EPA has concluded that a waiver of the Buy American provisions is justified....

  19. The Older Person's Handbook. Ideas, Projects and Resources for Neighborhood Action. A Mutual Aid Project Handbook.

    ERIC Educational Resources Information Center

    Cala, Michael; And Others

    The Mutual Aid Project (MAP) has developed a community organizing and planning approach which has focused its attention on the continuing role of older people within their neighborhoods. This approach has sought to strengthen not only the day-to-day arrangements for mutual aid and support, but also those actions which will assist groups in…

  20. Public opinion and communicative action around renewable energy projects

    NASA Astrophysics Data System (ADS)

    Fast, Stewart

    This thesis investigates how rural communities negotiate the development of renewable energy projects. Public and local community acceptance of these new technologies in rural areas around the world is uncertain and spatially uneven and represents an area of emerging public policy interest and one where scholarly theory is rapidly developing. This thesis uses Habermasian concepts of public sphere, communicative action and deliberative democracy, as well as the concept of "wicked problems" from the planning studies literature combined with geographical concepts of place and scale to advance theoretical and empirical understanding of how public opinion on renewable energy technologies is formed in place. It documents energy use patterns, attitudes and socio-political relations at a time when considerable state and business efforts are directed at the construction of solar, wind, biomass and small-hydro technologies in rural regions. These concepts and theories are applied in a case study of rural communities in the Eastern Ontario Highlands, an impoverished area undergoing rapid restructuring driven by centralization of services and amenity migration but with abundant natural resources in form of forests, numerous waterways and open space which have attracted a broad range of new energy developments. Overall high levels of support for alternative energy development particularly for solar power were found, albeit for reasons of local energy security and not for reasons of preventing climate change. There was some evidence that seasonal residents are less supportive of hydro and biomass projects than permanent residents possibly reflecting broader trends in rural economies away from productive uses of land to consumptive appreciation of rural landscapes. The thesis suggests that collective action to advance energy projects in the case study area require agreement along three world-claims (truth, rightness and truthfulness) and that communication leading to discourse

  1. Analytical technique for satellite projected cross-sectional area calculation

    NASA Astrophysics Data System (ADS)

    Ben-Yaacov, Ohad; Edlerman, Eviatar; Gurfil, Pini

    2015-07-01

    Calculating the projected cross-sectional area (PCSA) of a satellite along a given direction is essential for implementing attitude control modes such as Sun pointing or minimum-drag. The PCSA may also be required for estimating the forces and torques induced by atmospheric drag and solar radiation pressure. This paper develops a new analytical method for calculating the PCSA, the concomitant torques and the satellite exposed surface area, based on the theory of convex polygons. A scheme for approximating the outer surface of any satellite by polygons is developed. Then, a methodology for calculating the projections of the polygons along a given vector is employed. The methodology also accounts for overlaps among projections, and is capable of providing the true PCSA in a computationally-efficient manner. Using the Space Autonomous Mission for Swarming and Geo-locating Nanosatellites mechanical model, it is shown that the new analytical method yields accurate results, which are similar to results obtained from alternative numerical tools.

  2. Res Judicata and Section 1983: The Effect of State Court Judgments on Federal Civil Rights Actions.

    ERIC Educational Resources Information Center

    Levenson, Laurie L.

    1979-01-01

    Argues for a consistent approach to determining when Section 1983 litigation may follow state proceedings. Provides guidelines similar to those applied in habeas corpus proceedings for deciding when federal action will be barred. Available from UCLA Law Review, 405 Hilgard Ave., Los Angeles, CA 90024. (IRT)

  3. 77 FR 68790 - Program Comment Issued for Streamlining Section 106 Review for Actions Affecting Post-1945...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    .../archive/NotesDocs/25-25%2815%29_FR.pdf ). (A) Reinforced concrete slab bridges (i) Reinforced concrete... Concrete and Steel Bridges AGENCY: Advisory Council on Historic Preservation. ACTION: Program Comment issued for streamlining Section 106 review for undertakings affecting post-1945 concrete and...

  4. UMTRA Ground Water Project management action process document

    SciTech Connect

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards.

  5. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  6. Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2008-01-01

    This report presents the 2007 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. Requirements for CAU 447, as specified in the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense (DOD), and the State of Nevada, includes groundwater monitoring in support of site closure. This is the first groundwater monitoring report prepared by DOE-LM for the PSA.

  7. 75 FR 29601 - Notice of Final Federal Agency Actions on a Proposed Highway Project in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ...(1)(1). This action relates to an approval of a proposed highway project corridor. DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(1)(1). A claim... agency actions by issuing approvals for the Placer Parkway Corridor Preservation Project--Tier 1 in...

  8. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Administration on December 16, 2011 (76 FR 78332). This notice applies to all Federal agency decisions, actions... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Light Rail Project in... meaning of 23 U.S.C. 139(l)(1). The actions relate to the East Link Light Rail Transit Project in...

  9. Youth Paeticipation in Community Action: Report of a Demonstration Training Project.

    ERIC Educational Resources Information Center

    Cassidy, Rosalind

    Reporting a 1966 1-year demonstration project involving youth in community action, this pamphlet shows how the 24 community action programs in this California project selected and trained personnel, selected and trained youth trainees, established the needs of respective communities, set about to match these needs, and evaluated their action. The…

  10. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  11. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan. Revised

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  12. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    SciTech Connect

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department

  13. Action Research and Teacher Thinking: The First Phase of the Action Research on Action Research Project at the University of Wisconsin--Madison.

    ERIC Educational Resources Information Center

    Noffke, Susan E.; Zeichner, Kenneth M.

    This report on action research projects conducted by student teachers as a part of their preservice teacher preparation program focuses on how action research improves the understanding of educational practices by the practitioner-researchers themselves. Two major topics are discussed. First, specific types of claims about the impact of action…

  14. 77 FR 14464 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ...-94, I-894, and U.S. Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin. Those actions grant.... Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin, Project I.D. 1060-33-01. The project...

  15. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    SciTech Connect

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

  16. 76 FR 33309 - Guidance for Industry on Citizen Petitions and Petitions for Stay of Action Subject to Section...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... (74 FR 3611), FDA announced the availability of a draft version of this guidance and provided... Stay of Action Subject to Section 505(q) of the Federal Food, Drug, and Cosmetic Act; Availability... and Petitions for Stay of Action Subject to Section 505(q) of the Federal Food, Drug, and Cosmetic...

  17. Confirmatory radiological survey of the Grand Junction Projects Office Remedial Action Project exterior portions, 1989-1995

    SciTech Connect

    Forbes, G.H.; Egidi, P.V.

    1997-04-01

    The purpose of this independent assessment was to provide the U.S. Department of Energy (DOE) with an independent verification (IV) that the soil at the Grand Junction Projects Office (GJPO) complies with applicable DOE guidelines. Oak Ridge National Laboratory/ Environmental Technology Section (ORNL/ETS) which is also located at the GJPO, was assigned by DOE as the Independent Verification Contractor (IVC). The assessment included reviews of the decontamination and decommissioning plan, annual environmental monitoring reports, data in the pre- and post-remedial action reports, reassessment reports and IV surveys. Procedures and field methods used during the remediation were reviewed, commented on, and amended as needed. The IV surveys included beta-gamma and gamma radiation scans, soil sampling and analyses. Based on the data presented in the post-remedial action report and the results of the IV surveys, the remediation of the outdoor portions of the GJPO has achieved the objectives. Residual deposits of uranium contamination may exist under asphalt because the original characterization was not designed to identify uranium and subsequent investigations were limited. The IVC recommends that this be addressed with the additional remediation. The IVC is working with the remedial action contractor (RAC) to assure that final documentation WM be sufficient for certification. The IVC will address additional remediation of buildings, associated utilities, and groundwater in separate reports. Therefore, this is considered a partial verification.

  18. Radiological survey activities: uranium mill tailings remedial action project procedures manual

    SciTech Connect

    Little, C.A.; Berven, B.A.; Carter, T.E.; Espegren, M.L.; O'Donnell, F.R.; Ramos, S.J.; Retolaza, C.D.; Rood, A.S.; Santos, F.A.; Witt, D.A.

    1986-07-01

    The US Department of Energy (DOE) was assigned the responsibility for conducting remedial action at 24 sites, which are located in one eastern and nine western states. The DOE's responsibilities are being met through its Uranium Mill Tailings Remedial Action Project Office (UMTRA-PO) in Albuquerque, New Mexico. The purpose of this Procedures Manual is to provide a standardized set of procedures that document in an auditable manner the activities performed by the Radiological Survey Activities (RASA) group in the Dosimetry and Biophysical Transport Section (DABTS) of the Health and Safety Research Division (HASRD) at the Oak Ridge National Laboratory (ORNL), in its role as the Inclusion Survey Contractor (ISC). Members of the RASA group assigned to the UMTRA Project are headquartered in the ORNL/RASA office in Grand Junction, Colorado, and report to the ORNL/RASA Project Manager. The Procedures Manual ensures that the organizational, administrative, and technical activities of the RASA/UMTRA group conform properly to those of the ISC as described in the Vicinity Properties Management and Implementation Manual and the Summary Protocol. This manual also ensures that the techniques and procedures used by the RASA/UMTRA group and contractor personnel meet the requirements of applicable governmental, scientific, and industrial standards.

  19. Moving beyond Consultation and into Action with a Client Project

    ERIC Educational Resources Information Center

    Ewing, Sara; Dover, Howard F.

    2012-01-01

    Attempting to implement client-based projects within a single semester often overwhelms students and underwhelms the client and grading professor. In this paper, we share results from a two-year pilot project in which the components of a client project were split between several classes. We discuss the client project model as a valuable teaching…

  20. Beliefs and Issues Arising from a Virtual Collaborative Student-Alumni-Faculty Action Research Project

    ERIC Educational Resources Information Center

    Gordon, Sue Marquis; Edwards, Jennifer L.; Hollie-Major, Ramona D.

    2006-01-01

    Can graduate students in a distance learning environment gain meaningful research experience through a virtual action research project? The answer is an emphatic "yes." The purpose of this paper is to determine the extent to which students seeking an EdD degree can gain research experience through an action research project conducted in a virtual…

  1. Student Teacher Candidates' Effect on Student Learning as Measured through Action Research Projects

    ERIC Educational Resources Information Center

    Moffett, David W.; Reid, Barbara K.; Zhou, Yunfang

    2008-01-01

    The unit determined that "Assessment 5: Effect on Student Learning" would be best measured by student teachers and interns utilizing an action research activity in their clinical experience. Twenty four action research projects were evaluated by the Director of Student Teaching. Interraters blind to the Director's scores evaluated the projects.…

  2. Reshaping Literacy in a High Poverty Early Childhood Classroom: One Teacher's Action Research Project

    ERIC Educational Resources Information Center

    Rose, Lynnette; Vaughn, Margaret; Taylor, Linda

    2015-01-01

    This research explores an action research project conducted by the first author focused on supporting her preschool students' literacy and language development. Using observations, interviews, artifacts, and assessment, this research documents the first author's process of conducting an action research project over the course of one year to…

  3. Project Aprendizaje, 1988-89. Evaluation Section Report. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Velasquez, Clara

    In it's first year, Project Aprendizaje served 250 students from the Dominican Republic and Puerto Rico at Seward Park High School in Manhattan (New York). Project objectives were to improve participants' language skills in Spanish and English, help participants successfully complete content area courses needed for graduation, and provide career…

  4. Project HEED, Title III, Section 306. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hughes, Orval D.

    Project HEED (Heed Ethnic Educational Depolarization) involves over 1,000 Indian children in grades 1-8 in Arizona. The project target sites are 48 classrooms at Sells, Topowa, San Carlos, Many Farms, Hotevilla, Peach Springs, and Sacaton. Objectives are to increase: (1) reading achievement, (2) affective behavior of teachers, (3) motivation by…

  5. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  6. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  7. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  8. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  9. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  10. The calculation of radial dose from heavy ions: predictions of biological action cross sections

    NASA Astrophysics Data System (ADS)

    Katz, Robert; Cucinotta, Francis A.; Zhang, C. X.

    1996-02-01

    The track structure model of heavy ion cross sections was developed by Katz and co-workers in the 1960s. In this model the action cross section is evaluated by mapping the dose-response of a detector to γ rays (modeled from biological target theory) onto the radial dose distribution from δ rays about the path of the ion. This is taken to yield the radial distribution of probability for a "hit" (an interaction leading to an observable end-point). Radial integration of the probability yields the cross section. When different response from ions of different Z having the same stopping power is observed this model may be indicated. Since the 1960s there have been several developments in the computation of the radial dose distribution, in the measurement of these distributions, and in new radiobiological data against which to test the model. The earliest model, by Butts and Katz, made use of simplified δ ray distribution functions, of simplified electron range-energy relations, and neglected angular distributions. Nevertheless it made possible the calculation of cross sections for the inactivation of enzymes and viruses, and allowed extension to tracks in nuclear emulsions and other detectors and to biological cells. It set the pattern for models of observable effects in the matter through which the ion passed. Here we outline subsequent calculations of radial dose which make use of improved knowledge of the electron emission spectrum, the electron range-energy relation, the angular distribution, and some considerations of molecular excitation, of particular interest both close to the path of the ion and the outer limits of electron penetration. These are applied to the modeling of action cross sections for the inactivation of several strains of E-coli and B. subtilis spores where extensive measurements in the "thin-down" region have been made with heavy ion beams. Such calculations serve to test the radial dose calculations at the outer limit of electron penetration

  11. Developing Capacity for Social and Emotional Growth: An Action Research Project

    ERIC Educational Resources Information Center

    Doveston, Mary

    2007-01-01

    This article reports an action research project in which children, their teacher and the author, and an advisory teacher from a Local Authority collaborated as co-researchers in a project to improve working relationships in the classroom. Both appreciative enquiry and emancipatory research informed the project. This article focuses on one aspect…

  12. 76 FR 65776 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ...). The actions relate to a proposed highway project, US 41 (Memorial Drive to County M) in Brown County... from Memorial Drive to County M, The project will also reconstruct I-43 from US 41 to Atkinson Drive...-43 via US 41. The project limits on US 41 extend from Memorial Drive to County M, a distance...

  13. Multiple Intelligences Theory, Action Research, and Teacher Professional Development: The Irish MI Project

    ERIC Educational Resources Information Center

    Hanafin, Joan

    2014-01-01

    This paper presents findings from an action research project that investigated the application of Multiple Intelligences (MI) theory in classrooms and schools. It shows how MI theory was used in the project as a basis for suggestions to generate classroom practices; how participating teachers evaluated the project; and how teachers responded to…

  14. Students Upgrading Mathematical Achievement Project SUMA--1989. Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Barrera, Marbella

    Students Upgrading Mathematical Achievement (SUMA) is a part of the Bilingual Mathematics and Science Achievement project for Spanish-speaking Limited English Proficient (LEP) students. Its objective is to provide both remedial tutoring to students lacking mathematics skills and enrichment to students who are potentially gifted in mathematics.…

  15. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  16. Civil Rights--State Action Is a Requirement for the Application of Section 1985 (3) to First Amendment Rights

    ERIC Educational Resources Information Center

    Malpass, Susan C.

    1976-01-01

    In Bellamy v. Masons's Stores, Inc., the Fourth Circuit of Appeals held that section 1985 (3) of the Ku Klux Klan Act displayed a congressional intent that state action be required for an action based on a conspiracy to deprive first amendment rights. The decision is examined in regard to Griffin v. Breckenridge. For journal availability see HE…

  17. Climatic Action Plan Project for the state of Veracruz (Mexico)

    NASA Astrophysics Data System (ADS)

    Tejeda, A.; Ochoa, C.

    2007-05-01

    With financing of the British Government and support of the National Institute of Ecology, from April of 2006 to March of 2008 an action plan which intends variability effects and climatic change for the state of Veracruz will be made. This plan will be taken to the state government and will be spread out to manufacturers, industrialists and population. Throughout the Gulf of Mexico, the state of Veracruz is a 745 km coast in length with a width that goes from 156 km in the center to 47 km in the north. The state has large mountains, forests, plains, rivers, cascades, lagoons and coasts. Veracruz is the 10th largest state in Mexico with a 72,420 km2 surface, it is located between 17°00' and 22°28' north latitude and between 93°95' and 98°38' west longitude. Because of the orographic effect, the Sierra Madre Oriental causes the existence of many types of climate, from dry to tropical forest, going through snow on the top of the Pico de Orizaba (5747m of altitude). The wind affects the coasts by not allowing to fish during a hundred days a year (particularly in winter), and on summer tropical waves and occasionally hurricanes affect rivers causing overflow and urban floods in fields. These phenomena do not have a regular affectation; they are subject to climate variability effects. Veracruz is the third state with most population in the country (7.1 million people in 2005), only surpassed by the state of Mexico and Mexico City. Although it occupies 3.7% of the national territory, Veracruz has 6.9% of human population in the country, and is the 6th state of PIB national contribution (240 thousands of millions pesos approximately). Of the possible effects of the climatic change the following can be expected: , , : Most of the coasts of the Gulf of Mexico, low and sandy, less of a meter on the sea level, represent the most vulnerable territory of Veracruz. Towns will be affected, the saline water will infiltrate until the phreatic mantles and the coast electrical

  18. The Federal Art Project: Holger Cahill's Program of Action.

    ERIC Educational Resources Information Center

    Mavigliano, George J.

    1984-01-01

    Under the directorship of Holger Cahill, who drew upon John Dewey's principle of the universal communicability of art, the Federal Art Project of the Great Depression era gave all of the people the opportunity to study and enjoy art. Specific programs of the project are described. (RM)

  19. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Agencies qualified under 24 CFR part 883 to refund bonds which financed projects assisted pursuant to 24 CFR part 883, HUD requires compliance with the prohibition on duplicative fees contained in 24 CFR... finance Section 8 projects. 811.110 Section 811.110 Housing and Urban Development Regulations Relating...

  20. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Agencies qualified under 24 CFR part 883 to refund bonds which financed projects assisted pursuant to 24 CFR part 883, HUD requires compliance with the prohibition on duplicative fees contained in 24 CFR... finance Section 8 projects. 811.110 Section 811.110 Housing and Urban Development REGULATIONS RELATING...

  1. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Agencies qualified under 24 CFR part 883 to refund bonds which financed projects assisted pursuant to 24 CFR part 883, HUD requires compliance with the prohibition on duplicative fees contained in 24 CFR... finance Section 8 projects. 811.110 Section 811.110 Housing and Urban Development REGULATIONS RELATING...

  2. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Small flood control project..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Flood Control Policy § 263.23 Small flood control project authority (Section 205). (a) Legislative authority. Section 205 of the...

  3. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Small flood control project..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Flood Control Policy § 263.23 Small flood control project authority (Section 205). (a) Legislative authority. Section 205 of the...

  4. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Small flood control project..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Flood Control Policy § 263.23 Small flood control project authority (Section 205). (a) Legislative authority. Section 205 of the...

  5. An experimental study on the physical properties of the cupula. Effect of cupular sectioning on the ampullary nerve action potential.

    PubMed

    Suzuki, M; Harada, Y; Kishimoto, A

    1985-01-01

    The frog posterior semicircular canal (PSC) was isolated and a part of the ampullary wall was cut to allow removal of the cupula from the crista. The cupula was replaced on the crista and the PSC ampullary action potential was recorded. The cupula was again removed and was sectioned in half, either in the plane vertical to the crista (vertical sectioning), or in the plane parallel to the crista (horizontal sectioning). The sectioned half of the cupula was then replaced on the crista. The action potentials after replacement of the vertical or horizontal segments of the cupula were compared to those achieved when the entire cupula was replaced. After vertical sectioning, the action potentials were significantly reduced; they were 50.3% of the completely replaced cupula when a small stimulus was used and 79.1% when a large stimulus was used. A reduced attachment surface between the cupular base and the crista is possibly responsible for the decreased action potential in the vertically sectioned specimen. After horizontal sectioning, the action potentials were 64.5% for the small stimulus and 108.2% for the large stimulus. These results indicate that elicited responses are related to the height of the cupula and the deflection angle. This further suggests that the movement of the cupula is represented by that of the elastic system.

  6. Enhancing Students' Creative Writing Skills: An Action Research Project

    ERIC Educational Resources Information Center

    Nasir, Laraib; Naqvi, Syeda Meenoo; Bhamani, Shelina

    2013-01-01

    This research aimed to improve written expression (composition) skills of 5th grade students of an elite private school. The research was designed under the paradigm of action research. A total sample of 39 students' from the same grade was chosen for the study. The baseline assessment was carried out to explore the pre-intervention writing skill…

  7. Children's Ideas about Animal Adaptations: An Action Research Project

    ERIC Educational Resources Information Center

    Endreny, Anna Henderson

    2006-01-01

    In this paper, I describe the action research I conducted in my third-grade science classrooms over the course of two years. In order to gain an understanding of my third-grade students' ideas about animal adaptations and how the teaching of a unit on crayfish influenced these ideas, I used clinical interviews, observations, and written…

  8. Using Action Research Projects to Examine Teacher Technology Integration Practices

    ERIC Educational Resources Information Center

    Dawson, Kara

    2012-01-01

    This study examined the technology integration practices of teachers involved in a statewide initiative via one cycle of action research. It differs from other studies of teacher technology integration practices because it simultaneously involved and provided direct benefits to teachers and researchers. The study used thematic analysis to provide…

  9. Corrective action investigation plan for Project Shoal Area CAU No. 416

    SciTech Connect

    1996-08-01

    This Corrective Action Investigation Plan (CAIP) is part of an ongoing US Department of Energy (DOE)-funded project for the investigation of Corrective Action Unit (CAU) No. 416, Project Shoal Area (PSA). Project Shoal was conducted to determine whether seismic waves produced by underground nuclear testing could be differentiated from naturally occurring earthquakes. The PSA site is located approximately 30 miles southeast of Fallon, Nevada, in the northern portion of Sand Springs Mountains in Churchill County. This CAIP will be implemented in accordance with the Federal Facility Agreement and Consent Order, the Industrial Sites Quality Assurance Project Plan, and all applicable Nevada Division of Environmental Protection policies and regulations.

  10. Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)

    2001-01-01

    This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

  11. The first tunnel section of the Superconducting Super Collider project

    SciTech Connect

    Lundin, T.K.; Laughton, C.; Nelson, P.P.

    1990-11-01

    The Superconducting Super Collider (SSC) project will be constructed for the United States Department of Energy at a competitively-selected site in Ellis County, Texas, about 30 mile (50 km) south of the central business district of Dallas. The injector system and main collider ring will be housed in 70 mile (110 km) of tunnel, and the project will include additional shafts and underground enclosures with clear spans up to 30 ft (10 m) at depths of more than 250 ft (75 m). The first tunnel segment to be designed and constructed will include approximately 5.9 mile (9.4 km) of 12 ft (3.7 m) finished internal diameter tunnel, four shafts up to 55 ft (16.8 m) diameter, and various connecting tunnels and adits. Construction will be in weak rock lithologies, including mudstones, marls, and chalks with compressive strengths typically between 300 and 2500 psi (2.0 and 17.2 MPa). Design is underway, with an expected bid date before the end of 1990, and with start of construction following in the spring of 1991. 7 refs., 8 figs., 1 tab.

  12. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    SciTech Connect

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  13. Project L.O.S.T.: A "Grass Roots" Environmental Action Program by High School Students

    ERIC Educational Resources Information Center

    Hoban, Tana M.

    1977-01-01

    Divided into departments focusing on water analysis, marine studies, wildlife studies, and air analysis, Project Laboratory of Scientific Testing (LOST) is an exemplary ecological action program initiated by teenagers and furthered by community participation in Ithaca, New York. (JC)

  14. 24 CFR 402.6 - What actions must an owner take to request section 8 contract renewal under this part?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false What actions must an owner take to request section 8 contract renewal under this part? 402.6 Section 402.6 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF...

  15. 24 CFR 402.6 - What actions must an owner take to request section 8 contract renewal under this part?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false What actions must an owner take to request section 8 contract renewal under this part? 402.6 Section 402.6 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF...

  16. 24 CFR 402.6 - What actions must an owner take to request section 8 contract renewal under this part?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false What actions must an owner take to request section 8 contract renewal under this part? 402.6 Section 402.6 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF...

  17. 24 CFR 402.6 - What actions must an owner take to request section 8 contract renewal under this part?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false What actions must an owner take to request section 8 contract renewal under this part? 402.6 Section 402.6 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF...

  18. 24 CFR 402.6 - What actions must an owner take to request section 8 contract renewal under this part?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false What actions must an owner take to request section 8 contract renewal under this part? 402.6 Section 402.6 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF...

  19. 75 FR 43160 - Clean Water Act Section 303(d): Final Agency Action on One Arkansas Total Maximum Daily Load (TMDL)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ... AGENCY Clean Water Act Section 303(d): Final Agency Action on One Arkansas Total Maximum Daily Load (TMDL... Arkansas, under section 303(d) of the Clean Water Act (CWA). This TMDL was completed in response to the.../region6/water/npdes/tmdl/index.htm . FOR FURTHER INFORMATION CONTACT: Diane Smith at (214) 665-2145....

  20. The Constant Cycle: Day to Day Critical Action of the QUIPPED Project

    ERIC Educational Resources Information Center

    Medves, Jennifer M.; Paterson, Margo; Schroder, Cori; Verma, Sarita; Broers, Teresa; Chapman, Christine; O'Riordan, Anne

    2008-01-01

    Action research in the critical paradigm involves a process of continual refection in and on action including the research process itself. In the second in a series of several papers we report on the day-to-day management of the QUIPPED project. The aim was to facilitate patient centred care through inter-professional collaboration with health…

  1. Critical Literacy Practices, Social Action Projects, and the Reader Who Struggles in School

    ERIC Educational Resources Information Center

    Bauer, Courtney Marie

    2011-01-01

    This study, conducted at an urban public school, explored the engagements of five, fourth grade, African American students who struggled with reading in school as they participated in critical literacy practices and social action projects with the assumption that critical analysis of written texts and concrete social actions were necessary for…

  2. Blended Learning and Teaching Writing: A Teacher Action Research Project

    ERIC Educational Resources Information Center

    Camahalan, Faye Marsha G.; Ruley, Andrea G.

    2014-01-01

    This teacher research project focused on utilizing blended learning to teach writing to middle school students. The intervention was designed to fit into individual lessons needed to improve students' writing skills with the main focus on sentence structure. Sixteen (16) 7th grade students were assessed with a writing sample applying the new…

  3. 31 CFR 800.601 - Finality of actions under section 721.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (Continued) OFFICE OF INVESTMENT SECURITY, DEPARTMENT OF THE TREASURY REGULATIONS PERTAINING TO MERGERS, ACQUISITIONS, AND TAKEOVERS BY FOREIGN PERSONS Finality of Action § 800.601 Finality of actions under...

  4. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    SciTech Connect

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

  5. Taking Action: An Educator's Guide to Involving Students in Environmental Projects

    ERIC Educational Resources Information Center

    Council for Environmental Education, 2012

    2012-01-01

    Developed in cooperation with the World Wildlife Fund, "Taking Action" inspires ideas and provides models for conducting effective environmental projects--projects that dynamically engage students from start to finish. From adopting species to protecting habitats to saving energy and creating publications, this guide will help educators plan,…

  6. Learning about Democracy at School: An Action Research Project in Early Childhood Education

    ERIC Educational Resources Information Center

    Sánchez-Blanco, Concepción

    2015-01-01

    This article examines part of an action research project carried out in a Spanish public school. We explain the complex reality of an early childhood education classroom. Focusing on early childhood education, the project was developed in collaboration with a teacher from one of the classrooms of four year olds. Several of the children in the…

  7. The Charlotte Action Research Project: A Model for Direct and Mutually Beneficial Community-University Engagement

    ERIC Educational Resources Information Center

    Morrell, Elizabeth; Sorensen, Janni; Howarth, Joe

    2015-01-01

    This article describes the evolution of the Charlotte Action Research Project (CHARP), a community-university partnership founded in 2008 at the University of North Carolina at Charlotte, and focuses particularly on the program's unique organizational structure. Research findings of a project evaluation suggest that the CHARP model's unique…

  8. Library Spaces for Urban, Diverse Commuter Students: A Participatory Action Research Project

    ERIC Educational Resources Information Center

    Brown-Sica, Margaret S.

    2012-01-01

    A data-gathering project using elements of Participatory Action Research was conducted at the Auraria Library, which serves the University of Colorado Denver, the Metropolitan State College of Denver and the Community College of Denver. The project was administered in order to shape a plan to develop a Learning Commons environment at the library.…

  9. Actionable Data Projects: Social Science and Service-Learning in General Education Courses

    ERIC Educational Resources Information Center

    Maloyed, Christie L.

    2016-01-01

    The use of service-learning pedagogies in general education courses is often limited to increasing volunteerism or civic literacy with problem-based or research-based projects reserved for upper level courses. This article examines the implementation of an "actionable data" service-learning project in an introductory, general studies…

  10. Implementing an Action Research Project: A Case Study in Making Decisions and Managing Challenges

    ERIC Educational Resources Information Center

    Greenbank, Paul

    2013-01-01

    This paper examines the challenges involved in implementing an action research project. It discusses a project which uses a series of interventions (unfreezing techniques, cases studies in conjunction with analogical encoding and lecturer input) to encourage students to critically reflect on their approach to career decision-making. This paper…

  11. What Is My Role? Establishing Teacher and Youth Worker Responsibilities in Social Action Projects

    ERIC Educational Resources Information Center

    Epstein, Shira Eve

    2013-01-01

    In this research, I analyze the roles of teachers and youth workers from a community-based organization in the context of two high school social action projects. Both the teachers and the youth workers assumed distinct roles while working together during the civic project enactments. The teachers were largely positioned as responsible for…

  12. Full Circle: Stakeholders' Evaluation of a Collaborative Enquiry Action Research Literacy Project

    ERIC Educational Resources Information Center

    Forey, Gail; Firkins, Arthur S.; Sengupta, Sima

    2012-01-01

    This paper reports on school-university collaboration during an action research project, which aimed to build a writing pedagogy for students with Learning Disabilities in the trilingual, biliterate educational context of Hong Kong. The project was established through interpersonal relationships built from the ground up between stakeholders from a…

  13. With Hindsight: An Overview of the Autism Spectrum Disorder Participatory Action Research Project

    ERIC Educational Resources Information Center

    Curzon, Joanna

    2008-01-01

    Much has happened since nine teams across New Zealand engaged in a Ministry of Education-funded participatory action research project looking at effective practice for supporting children and young people with autism spectrum disorder (ASD) in education. Building on earlier discussions, the project ran from 2002 to 2004, and until now the story…

  14. Creating the Tools for Multilingualism: A School-Based Action Research Project

    ERIC Educational Resources Information Center

    Martin, Cynthia

    2010-01-01

    This article reports on the small-scale evaluation of a school-based action research project, focusing on the creation of teaching materials aimed at developing tools for multilingualism for pupils aged 7-14. This three-year project was launched in September 2004 in 12 state primary schools and two secondary schools in two local authorities in the…

  15. Enhancing the Undergraduate Student Experience via Fund-Raising Partnerships: An Action Research Project

    ERIC Educational Resources Information Center

    Thorley, Wendy; Marjoribanks, Bruce; Kranz, Julian

    2014-01-01

    This project was developed from practitioner action research and considers the impact of integrating fund-raising activities into the formal curriculum with a target group of undergraduate students. The main aim of this project was to evaluate the impact of developing fund-raising activities as an integral aspect at both module and programme…

  16. Project HealthDesign: enhancing action through information.

    PubMed

    Brennan, Patricia Flatley; Casper, Gail; Downs, Stephen; Aulahk, Veenu

    2009-01-01

    Project HealthDesign is a country-wide initiative in the United States designed to stimulate innovation in personal health records (PHRs). Nine grantee teams engaged in an 18-month long design and prototyping process. Two teams addressed the needs of children and adolescents; three created novel approaches to help adults prevent or manage metabolic syndrome; three groups employed interface innovations to assist patients with chronic care management and one team devised a novel calendaring system to assist patients undergoing complex medical/surgical treatments to integrate care processes into their daily lives. These projects not only included development and testing of novel personal health records applications, but also served as the starting point to specify and implement a common technical core platform. The project advanced PHR development in two key ways: intensive user-centered design and a development architecture that separates applications of PHRs from the infrastructure that supports them. The initiative also allowed systematic investigation of significant ethical, legal and social issues, including how privacy considerations are changed when information technology innovations are used in the home and the rebalancing of the authority structure of health care decision making when patient-centered approaches guide the design of PHRs.

  17. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., recruitment, testing, ranking certification, interview, recommendations for selection, hiring, promotion, etc... agencies, it recognizes that affirmative action cannot be viewed as a standardized program which must...

  18. A&M. TAN607. Southern sections added in expansion project of 1957. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A&M. TAN-607. Southern sections added in expansion project of 1957. Camera facing northwest. Concrete decontamination section on left end. Photographer: Jack L. Anderson. Date: October 23, 1957. INEEL negative no. 57-5337 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  19. 26 CFR 301.7409-1 - Action to enjoin flagrant political expenditures of section 501(c)(3) organizations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Action to enjoin flagrant political... political expenditures of section 501(c)(3) organizations. (a) Letter to organization. When the Assistant... engaged in flagrant political intervention and is likely to continue to engage in political...

  20. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  1. 77 FR 65929 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Crossing Project in New York AGENCY: Federal Highway Administration (FHWA), U.S. DOT. ACTION: Notice of.... Sec. 139(l)(1). The actions relate to the Tappan Zee Hudson River Crossing Project located in Rockland... the following highway project in the State of New York: Tappan Zee Hudson River Crossing...

  2. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    SciTech Connect

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  3. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    SciTech Connect

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  4. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... opportunity is construction of any affirmative action plan should be an analysis of the employer's work force... progress in a career field; (d) Revamping selection instruments or procedures which have not yet...

  5. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... opportunity is construction of any affirmative action plan should be an analysis of the employer's work force... progress in a career field; (d) Revamping selection instruments or procedures which have not yet...

  6. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... undercapitalized savings associations. In addition to the provisions of section 38 of the FDI Act described...

  7. 12 CFR 6.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... critically undercapitalized, the bank shall become subject to the provisions of section 38 of the FDI Act— (i... undercapitalized banks. In addition to the provisions of section 38 of the FDI Act described in paragraph (a)(2)...

  8. 12 CFR 208.45 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... issuing directives under 12 CFR 263.202 and 263.204, unless otherwise provided in section 38 or this... subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital distributions... the FDI Act: (i) Restricting payment of capital distributions and management fees (section 38(d));...

  9. Streamlined approach for environmental restoration plan for corrective action unit 416, Mud Pit, Project Shoal Area

    SciTech Connect

    1997-07-01

    This plan addresses the actions necessary for the restoration and closure of the Project Shoal Area (PSA), Surface Corrective Action Unit (CAU) 416, Mud Pit (Corrective Action Site No. 57-09-01), a pit that was used to store effluent produced during drilling of the Post-Shot Borehole PS-1 in 1963. This plan describes the activities that will occur at the site and the steps that will be taken to gather enough data to obtain a notice of completion from the Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented with the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996) and the Industrial Sites Quality Assurance Project Plan (DOE/NV, 1994). The SAFER process is being employed at this CAU where enough information exists about the nature and extent of contamination to propose an appropriate corrective action without completing a Corrective Action Decision Document and Corrective Action Plan. This process combines elements of the Data Quality Objective (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. This has already been completed for the mud pit so it will not be repeated here. The DQOs for the mud pit are presented in the Corrective Action Investigation Plan for Project Shoal Area, CAU No. 416 (DOE/NV, 1996). This observational approach provides a framework for managing uncertainty and planning decision making.

  10. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown.

  11. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  12. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  13. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  14. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  15. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  16. Federal Policy in Action: A Case Study of an Urban Education Project.

    ERIC Educational Resources Information Center

    Smith, Louis M.; Dwyer, David C.

    This monograph describes the origins and implementation of a Federal educational program, the Inquiry and Assistance Project (IAP), designed to improve urban public schools through the efforts of researchers and consultants in a research and development setting. The first section provides background information on the IAP study. Section two…

  17. Some Recurrent Disagreements about Social Change Which Affect Action Research Projects.

    ERIC Educational Resources Information Center

    Hofstetter, Heather N.; Hofstetter, Merlin I.

    This paper describes the beliefs and values of a pluralistic approach to social change and of four competing approaches: social Darwinism, functionalism, militancy, and conflict theory. Stressing the alienation and dogmatism of the competing approaches, the authors relate each approach to its operation in community action projects. Social…

  18. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... actions relate to a proposed highway and transit project within the Tier 1 Elgin O'Hare--West Bypass study... within the Elgin O'Hare--West Bypass study area in Cook and DuPage Counties in Illinois. Decisions in...

  19. 77 FR 75254 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... actions relate to a proposed highway and transit project within the Tier 2 Elgin O'Hare--West Bypass... accommodations; construction of a new toll road between I-90 and I-294 (known as the West Bypass) with two basic lanes in each direction and space reserved on the east side of the north leg of the West Bypass...

  20. 76 FR 77301 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... third lane in both directions on US 18/151 from the CTH PD interchange to the Raymond Road intersection... regional traffic by constructing a depressed freeway down the center of Verona Road. A US 151/18 system... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway Project...

  1. The Student Consultant Project (SCP): A Case Study of Student Involvement in Social Action.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. University Urban Interface Program.

    The Student Consultant Project (SCP) at the University of Pittsburgh is designed to bring technical assistance from the university to ghetto community businessmen. SCP represents a working model of student involvement with social action, an ongoing effort within the community emphasizing cooperation between the university and 1 of its…

  2. The Evaluation of an Early Childhood Teacher Preparation Program: An Action Research Project

    ERIC Educational Resources Information Center

    Ragno, Kerry Sullivan

    2013-01-01

    The purpose of this dissertation was to evaluate the effectiveness of an Early Childhood Development Associate of Applied Science (AAS) degree program at one community college as part of an ongoing action research project. Prior to this dissertation study, external and internal barriers prevented the associate degree program stakeholders from…

  3. Conscious Engagement in Undergraduate Male Nursing Students: Facilitating Voice through an Action Research Project

    ERIC Educational Resources Information Center

    Maykut, Colleen A.; Lee, Andrew; Argueta, Nelson Garcia; Grant, Sean; Miller, Cole

    2016-01-01

    Although women have made significant progress into traditionally male-dominated professions, such as medicine and engineering, the same cannot be said of men in the nursing profession. Utilizing a critical social theory perspective, an action research project was designed to encourage participants, current male nursing students and alumni of…

  4. The Early Childhood Education of Aboriginal Australians: A Review of Six Action-Research Projects.

    ERIC Educational Resources Information Center

    Teasdale, G. R.; Whitelaw, A. J.

    The book describes the setting, objectives, program, evaluation and achievement of six innovative action-research early childhood education projects for Aboriginal Australian children, traces various previous attempts to provide education, and provides an historical background of the estimated 140,000 Aboriginal people who make up 1% of…

  5. Culminating Experience Action Research Projects, Volume 15, Part 1, Fall 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  6. The Action--Reflection--Modelling (ARM) Pedagogical Approach for Teacher Education: A Malaysia-UK Project

    ERIC Educational Resources Information Center

    Jarvis, Joy; Dickerson, Claire; Thomas, Kit; Graham, Sally

    2014-01-01

    This article presents the Action--Reflection--Modelling (ARM) pedagogical approach for teacher education developed during a Malaysia-UK collaborative project to construct a Bachelor of Education (Honours) degree programme in Primary Mathematics, with English and Health and Physical Education as minor subjects. The degree programme was written…

  7. Chicana Feminist Strategies in a Participatory Action Research Project with Transnational Latina Youth

    ERIC Educational Resources Information Center

    Sanchez, Patricia

    2009-01-01

    This article discusses a participatory action research (PAR) project carried out with three transnational Latina youth in northern California and how the university researcher incorporated Chicana feminist strategies in the study. PAR and Chicana feminism place at the heart of research the knowledge that ordinary people produce, referring to this…

  8. Culminating Experience Action Research Projects, Volume 8, Part 1, Spring 2006

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Fritch, Sarah C., Ed.

    2007-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  9. Clients, Colleagues or Experts? Defining Identities in an Action Research Project

    ERIC Educational Resources Information Center

    Coco, Angela; Varnier, Catherine; Deftereos, Chris

    2007-01-01

    This article examines how discourses shaped and were shaped by participants' identities in a participatory action research (PAR) project in a tertiary education environment. The primary researcher and the director of the university's desktop publishing team explored the idea of working together to help the newly formed team to develop strategies…

  10. Participatory Action Research: Reflections on Critical Incidents in a PAR Project.

    ERIC Educational Resources Information Center

    Santelli, Betsy; Singer, George H. S.; DiVenere, Nancy; Ginsberg, Connie; Powers, Laurie E.

    1998-01-01

    This article describes a participatory action research (PAR) project designed to evaluate Parent to Parent programs in five states. The process of developing a shared understanding of the program and of the purpose for evaluating them, along with an on-going willingness of parents and researchers to compromise, led to creative solutions to…

  11. "Who Did What?": A Participatory Action Research Project to Increase Group Capacity for Advocacy

    ERIC Educational Resources Information Center

    Garcia-Iriarte, E.; Kramer, J. C.; Kramer, J. M.; Hammel, J.

    2009-01-01

    Background: This participatory action research (PAR) project involved a collaboration with a self-advocacy group of people with intellectual disabilities that sought to build group capacity for advocacy. Materials and Methods: This study used a focus group, sustained participatory engagement and a reflexive process to gather qualitative and…

  12. Culminating Experience Action Research Projects, Volume 16, Part 1, Spring 2010

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  13. An Action Research Project Exploring the Psychology Curriculum and Transitions to Employment

    ERIC Educational Resources Information Center

    McMurray, Isabella; Roberts, Pat; Robertson, Ian; Teoh, Kevin

    2011-01-01

    Within the UK, traditional subject-specific areas are increasingly being complemented by the provision of opportunities to foster students' personal development planning as an aide to support their future employment and lifelong learning. This paper describes an action research project which examined employability skills within a psychology…

  14. A Survey of Food Projects in the English NHS Regions and Health Action Zones in 2001

    ERIC Educational Resources Information Center

    Caraher, Martin; Cowburn, Gill

    2004-01-01

    Background and Objective: This article sets out the findings from an analysis of food projects, with a particular emphasis on fruit and vegetables, from the 26 Health Action Zones (HAZs) in England and those taking place within the former NHS regional areas in 2001. The objective was to gather information on the existing practice to inform future…

  15. The QUIPPED Project: Exploring Relevance and Rigor of Action Research Using Established Principles and Criteria

    ERIC Educational Resources Information Center

    Chapman, Christine; Paterson, Margo; Medves, Jennifer M.

    2011-01-01

    This paper is the last in a series of three manuscripts published in the TQR journal over the past few years. This work is part of a larger program of research that has been carried out by a team of researchers detailing various aspects of a three year action research project carried out from 2005 and 2008. This particular paper addresses issues…

  16. Action!

    ERIC Educational Resources Information Center

    Senese, Joseph

    1998-01-01

    A small group of teachers at one Illinois high school is helping to effect and promote change. Through the Action Research Laboratory (ARL), teams of teachers conduct collaborative action research to improve classroom practices. Data from the first two years of the ARL indicate that teachers are eager to participate in, and have thrived in, their…

  17. A Leadership Project in Action: A Project Adventure New Zealand & Dunstan High School Initiative.

    ERIC Educational Resources Information Center

    Schusser, Eric

    1998-01-01

    The Leadership Project uses community partnerships to initiate a systematic response to drug and alcohol use, violence, and crime among teenagers in Alexandria, New Zealand. Aspects of the project include adventure-based violence intervention and counseling in the high school and leadership training at an outdoor education center. Preliminary…

  18. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... savings association (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan within... submit or implement in any material respect an acceptable capital restoration plan, the...

  19. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... savings association (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan within... submit or implement in any material respect an acceptable capital restoration plan, the...

  20. [Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1992-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

  1. 12 CFR 325.105 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the FDI Act on payment of capital distributions and management fees. (2) Provisions applicable to... the provisions of section 38 of the FDI Act: (i) Restricting payment of capital distributions and... to the provisions of section 38 of the FDI Act described in paragraph (a)(2) of this...

  2. 78 FR 67036 - Extension of Deadline for Action on the Section 126 Petition From Eliot, Maine

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ...-and-comment process required for our review of a petition submitted by the Town of Eliot, Maine... Air Quality Planning and Standards (C504-04), U.S. EPA, Research Triangle Park, North Carolina 27709... procedural action to extend the deadline for the EPA to respond to a petition from the Town of Eliot,...

  3. 75 FR 39633 - Extension of Deadline for Action on Section 126 Petition From New Jersey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ... Environmental Health Risks and Safety Risks This action is not subject to Executive Order 13045 (62 FR 19885... Executive Order 12898 (59 FR 7629 (Feb. 16, 1994)) establishes federal executive policy on environmental... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL...

  4. A Time Projection Chamber for precision 239Pu(n,f) cross section measurement

    SciTech Connect

    Heffner, M

    2008-01-14

    High precision measurements of the {sup 239}Pu(n,f) cross section have been identified as important for the Global Nuclear Energy Partnership (GNEP) and other programs. Currently the uncertainty on this cross section is of the order 2-3% for neutron energies below 14 MeV and the goal is to reduce this to less than 1%. The Time Projection Chamber (TPC) has been identified as a possible tool to make this high precision measurement.

  5. [Constructivist evaluation, under an integrating and intersectoral approach, of actions of the Disque Idoso Project in Sobral (CE, Brazil)].

    PubMed

    Freitas, Cibelly Aliny Siqueira Lima; Teófilo, Tiago José Silveira

    2010-09-01

    The population aging in Brazil and in the world is a reason for an epidemic inquietude. So, the violence against senior people has been considered a problem of public health. This study takes as context the health need of seniors that suffer of violence, aiming to evaluate in a constructive way the Disque Idoso Project in Sobral (Ceará, Brazil). We used Furtado's Constructivist Method of Evaluation, which provides practices of participative evaluation. Trying to reach such perspective, we are guided by paths of the integrative approach (inter, multi and transdisciplinary) and intersectoral. We accomplished the focal groups with representatives of the sections of health, social assistance, justice and senior, the benefited by the project as well as others that contribute to its development. When interacting with the professionals that act in the project headquarters we understood that there is a fear in publishing their work, because there is not structure to enlarge the attendance. The group believes that the efficiency of its actions is limited due to the lack of transport and other professionals. For the professionals of the support social networks, the project should look for intersectoral performance, once it intends to reach a complete attendance. For the seniors, the project is quite valid and needs to be consolidated in the district.

  6. Technique of estimation of actual strength of a gas pipeline section at its deformation in landslide action zone

    SciTech Connect

    Tcherni, V.P.

    1996-12-31

    The technique is given which permits determination of stress and strain state (SSS) and estimation of actual strength of a section of a buried main gas pipeline (GP) in the case of its deformation in a landslide action zone. The technique is based on the use of three-dimensional coordinates of axial points of the deformed GP section. These coordinates are received by a full-scale survey. The deformed axis of the surveyed GP section is described by the polynomial. The unknown coefficients of the polynomial can be determined from the boundary conditions at points of connection with contiguous undeformed sections as well as by use of minimization methods in mathematical processing of full-scale survey results. The resulting form of GP section`s axis allows one to determine curvatures and, accordingly, bending moments along all the length of the considered section. The influence of soil resistance to longitudinal displacements of a pipeline is used to determine longitudinal forces. Resulting values of bending moments and axial forces as well as the known value of internal pressure are used to analyze all necessary components of an actual SSS of pipeline section and to estimate its strength by elastic analysis.

  7. Aircraft engine hot section technology: An overview of the HOST Project

    NASA Technical Reports Server (NTRS)

    Sokolowski, Daniel E.; Hirschberg, Marvin H.

    1990-01-01

    NASA sponsored the Turbine Engine Hot Section (HOST) project to address the need for improved durability in advanced aircraft engine combustors and turbines. Analytical and experimental activities aimed at more accurate prediction of the aerothermal environment, the thermomechanical loads, the material behavior and structural responses to loads, and life predictions for cyclic high temperature operation were conducted from 1980 to 1987. The project involved representatives from six engineering disciplines who are spread across three work disciplines - industry, academia, and NASA. The HOST project not only initiated and sponsored 70 major activities, but also was the keystone in joining the multiple disciplines and work sectors to focus on critical research needs. A broad overview of the project is given along with initial indications of the project's impact.

  8. 76 FR 18548 - Clean Water Act Section 303(d): Final Agency Action on Three Total Maximum Daily Loads (TMDLs) in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ...This notice announces final agency action on three TMDLs prepared by EPA Region 6 for waters listed in Louisiana's Mississippi River Basin, under Section 303(d) of the Clean Water Act (CWA). Documents from the administrative record file for the three TMDLs, including TMDL calculations and responses to comments, may be viewed at http://www.epa.gov/region6/water/npdes/tmdl/index.htm. The......

  9. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    SciTech Connect

    Not Available

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date.

  10. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock... a proposed highway project, Sunrise Project, I-205 to Rock Creek Junction, Clackamas County, Oregon..., NE., Suite 100, Salem, Oregon 97301, Telephone: (503) 587-4716. The Sunrise Project, I-205 to...

  11. 12 CFR 390.455 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... State savings association (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan... capital restoration plan, the State savings association shall become subject to the provisions of...

  12. Implementing the "Marketing You" Project in Large Sections of Principles of Marketing

    ERIC Educational Resources Information Center

    Smith, Karen H.

    2004-01-01

    There is mounting pressure on business education to increase experiential learning at the same time that budget constraints are forcing universities to increase class size. This article explains the design and implementation of the "Marketing You" project in two large sections of Principles of Marketing to bring experiential learning into the…

  13. Toward Solutions: The Work of the Physics Action-Research Group. Learning in Science Project. Working Paper No. 32.

    ERIC Educational Resources Information Center

    Osborne, Roger; Schollum, Brendan

    In the action-research phase of the Learning in Science Project, four groups of people worked on problems identified in the project's second (in-depth) phase. The Physics action-research group considered problems related to the teaching and learning of ideas associated with force and motion, suggesting that children's ideas of these concepts might…

  14. Toward Solutions: The Work of the Chemistry Action-Research Group. Learning in Science Project. Working Paper No. 35.

    ERIC Educational Resources Information Center

    Osborne, Roger; And Others

    In the action-research phase of the Learning in Science Project, four groups of people worked on problems identified in the project's second (in-depth) phase. The Chemistry Action-Research Group considered problems related to the teaching and learning of ideas associated with particles and physical/chemical changes. Based on findings during the…

  15. 78 FR 27473 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... (New NY Bridge) Project in New York, in the Federal Register at FR Doc. 2012-26799. Tappan Zee Hudson... Crossing Project in New York AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of... within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the Tappan Zee Hudson River...

  16. Action Memorandum for General Decommissioning Activities under the Idaho Cleanup Project

    SciTech Connect

    S. L. Reno

    2006-10-26

    This Action Memorandum documents the selected alternative to perform general decommissioning activities at the Idaho National Laboratory (INL) under the Idaho Cleanup Project (ICP). Preparation of this Action Memorandum has been performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the "Superfund Amendments and Reauthorization Act of 1986", and in accordance with the "National Oil and Hazardous Substances Pollution Contingency Plan". An engineering evaluation/cost analysis (EE/CA) was prepared and released for public comment and evaluated alternatives to accomplish the decommissioning of excess buildings and structures whose missions havve been completed.

  17. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  18. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  19. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  20. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  1. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  2. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  3. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    SciTech Connect

    1997-12-31

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project.

  4. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1996-10-01

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project.

  5. 26 CFR 301.7430-8 - Administrative costs incurred in damage actions for violations of section 362 or 524 of the...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... for violations of section 362 or 524 of the Bankruptcy Code. 301.7430-8 Section 301.7430-8 Internal... Administrative costs incurred in damage actions for violations of section 362 or 524 of the Bankruptcy Code. (a... Service relating to the willful violation of section 362 or 524 of the Bankruptcy Code only if...

  6. Administrative Action to End Discrimination Based on Handicap: HEW's Section 504 Regulation.

    ERIC Educational Resources Information Center

    Engebretson, Mark F.

    1979-01-01

    Examines the drafting of regulations under Section 504 of the Rehabilitation Act of 1973, which prohibits discrimination against handicapped persons by recipients of federal funds. Available from Harvard Legislative Research Bureau, Langdell Hall, Harvard Law School, Cambridge, MA 02138; single copy $4.00. (Author/IRT)

  7. WSSRAP chemical plant geotechnical investigations for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1990-12-01

    This document has been prepared for the United states Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which consists of MK-Ferguson Company (MKF) and Morrison Knudsen Corporation Environmental Services Group (MKES) with Jacobs Engineering Group (JEG) as MKF's predesignated subcontractor. This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. The WSCP/RP is the proposed disposal cell (DC) site. 39 refs., 24 figs., 12 tabs.

  8. 2008 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2009-03-01

    This report presents the 2008 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof of concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the site during 2008. This is the second groundwater monitoring report prepared by LM for the PSA

  9. 2010 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2011-02-01

    This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended March 2010) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes the results from the groundwater monitoring program during fiscal year 2010.

  10. 2009 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2010-03-01

    This report presents the 2009 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the PSA during fiscal year 2009.

  11. Reining in agency action: the rejected proposal rule and Section 1011 of the 2003 Medicare Act.

    PubMed

    Charles, Sabrina

    2006-01-01

    Section 1011 of the 2003 Medicare Act authorized the disbursement of over one billion dollars to healthcare providers that provide uncompensated emergency medical care to undocumented immigrants. In 2005, the Centers for Medicare and Medicaid Services (CMS) issued its final interpretation of the statute. Despite previous statementsto the contrary, CMS conditioned eligibilityfor Section 1011 funds on the collection of certain immigration status-related information from patients seeking emergency care. Prior to the issuance of CMS' final guidance, the House defeated House Resolution 3722, which was substantially similar to the CMS final guidance. This Article argues that the House's rejection of H.R. 3722 renders CMS's final guidance invalid under the analysis set forth in Chevron, U.S.A. Inc. v. National Resources Defense Council, Inc. PMID:17260547

  12. Reining in agency action: the rejected proposal rule and Section 1011 of the 2003 Medicare Act.

    PubMed

    Charles, Sabrina

    2006-01-01

    Section 1011 of the 2003 Medicare Act authorized the disbursement of over one billion dollars to healthcare providers that provide uncompensated emergency medical care to undocumented immigrants. In 2005, the Centers for Medicare and Medicaid Services (CMS) issued its final interpretation of the statute. Despite previous statementsto the contrary, CMS conditioned eligibilityfor Section 1011 funds on the collection of certain immigration status-related information from patients seeking emergency care. Prior to the issuance of CMS' final guidance, the House defeated House Resolution 3722, which was substantially similar to the CMS final guidance. This Article argues that the House's rejection of H.R. 3722 renders CMS's final guidance invalid under the analysis set forth in Chevron, U.S.A. Inc. v. National Resources Defense Council, Inc.

  13. Action-projection in Japanese conversation: topic particles wa, mo, and tte for triggering categorization activities

    PubMed Central

    Tanaka, Hiroko

    2015-01-01

    Conversation analytic work has revealed how anticipatory completions and preemptive actions can offer invaluable glimpses into the cognitive, contextual, grammatical, and temporal bases of projectability in turn-taking, by virtue of their potential not only as a display of participants' online prediction of roughly what it might take to complete a turn-in-progress but also to plan the next move. While the predicate-final word order and the incremental transformability of turns in Japanese generally lead to delayed projectability of turn-endings, this may be partially offset by the capacity of certain postpositional particles to trigger and propel prospective action trajectories. This article engages in a case study of the topic particle wa (and related particles mo and tte), by demonstrating how its grammatical affordances, the categorization activities, and cognitive processing it can set in motion, coupled with the immediate contextual, and temporal-productional features may coalesce to a point of critical mass, thereby enhancing the projectability of the not-yet-produced trajectory of the current turn. The discussion attempts to contribute to recent debates on ways language-specific lexicogrammatical resources are deeply interlinked with the types of opportunities that are provided for social action. PMID:26379565

  14. Biomolecular imaging based on far-red fluorescent protein with a high two-photon excitation action cross section

    NASA Astrophysics Data System (ADS)

    Tsai, Tsung-Han; Lin, Cheng-Yung; Tsai, Huai-Jen; Chen, Szu-Yu; Tai, Shih-Peng; Lin, Kung-Hsuan; Sun, Chi-Kuang

    2006-04-01

    The two-photon excitation action cross section of Hc-Red fluorescent proteins (Hc-RFPs) is measured and found to be of the same order as that of enhanced green fluorescent proteins. With a 618 nm emission wavelength in the far-red region and with an excitation wavelength around 1200 nm, Hc-RPF-based two-photon fluorescence microscopy (2PFM) can offer deep penetration capability inside live samples and is ideal for in vivo gene expression study and biomolecular imaging in live objects. In vivo 2PFM of the developing heart deep inside a transgenic zebrafish embryo tagged by Hc-RFP is also successfully demonstrated.

  15. Cooperative and Context-Based Learning on Eletrochemical Cells in Lower Secondary Chemistry: A Project of Participatory Action Research

    ERIC Educational Resources Information Center

    Markic, Silvija; Eilks, Ingo

    2006-01-01

    This paper discusses a project of Participatory Action Research (PAR) on lower secondary chemistry education. In this ongoing project, practicing teachers and university researchers in chemical education jointly carry out projects for developing and evaluating new lesson plans. The focus of the PAR group is to develop teaching/learning activities…

  16. Key programmatic steps and activities for implementing the Uranium Mill Tailings Remedial Action Project. [UMTRA Project

    SciTech Connect

    Not Available

    1985-07-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) was enacted based upon findings by Congress that uranium mill tailings located at active and inactive hazard to the public, and that protection of the public health, safety and welfare, and the regulations of interstate commerce, require that every reasonable effort be made to provide for the stabilization, disposal, and control in a safe and environmentally sound manner of such tailings in order to prevent or minimize radon diffusion into the environment and to prevent or minimize other environmental hazards from such tailings.'' A general understanding of the steps leading to elimination of the hazards associated with designated uranium mill tailings sites, and the parties involved in that effort, are presented in this document. A representative schedule is also presented in this document to show both program sequence and activity interdependence. Those activities that have the most potential to influence program duration, because of the significant amount of additional time that may be required, include identification and selection of a suitable site, field data collection delays due to weather, actual acquisition of the designated or alternate disposal site, construction delays due to weather, and site licensing. This document provides an understanding of the steps, the sequence, the parties involved, and a representative duration of activities leading to remedial action and cleanup at the designated inactive uranium mill tailings sites. 10 refs., 5 figs., 1 tab.

  17. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    SciTech Connect

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  18. Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee

    SciTech Connect

    1996-08-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant.

  19. Industrial Sites Project Establishment of Final Action Levels, Rev. No.: 0

    SciTech Connect

    Boehlecke, Robert F.

    2006-02-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  20. A case study of the development of environmental action projects from the framework of participatory action research within two middle school classrooms

    NASA Astrophysics Data System (ADS)

    Charmatz, Kim

    The purpose of this study was to understand student and teacher empowerment through a socially critical environmental education perspective. The main research question guiding this study was: How do participants make sense of a learning experience in which students design and carry out an environmental action project in their community? This study used participatory action research and critical theory as practical and theoretical frameworks. These frameworks were relevant as this study sought to examine social change, power, and relationships through participants' experiences. The context of this study was within one seventh and one eighth grade classroom participating in environmental projects. The study was conducted in spring 2005 with an additional follow-up data collection period during spring 2006. The school was located in a densely populated metropolitan suburb. Fifty-three students, a teacher researcher, and three science teachers participated. Data sources were written surveys, scores on Middle School Environmental Literacy Survey Instrument (MSELI), observations, interviews, and student work. This study used a mixed methodological approach. Quantitative data analysis involved dependent samples t-test scores on the MSELI before and after the completion of the projects. Qualitative data were analyzed using an inductive analysis approach. This study has implications for educators interested in democratic education. Environmental action projects provide a context for students and teachers to learn interdisciplinary content knowledge, develop personal beliefs, and learn ways to take action in their communities. This pedagogy has the potential to increase cooperation, communication, and tensions within school communities. Students' participation in the development of environmental action projects may lead to feelings of empowerment or being able to make a difference in their community, as an individual or member of a group. Future research is needed to discern

  1. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... failure of remedial actions taken pursuant to CERCLA section 122. 307.42 Section 307.42 Protection of...-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) CLAIMS... taken pursuant to CERCLA section 122. (a) In the case of the failure of a completed remedial...

  2. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... failure of remedial actions taken pursuant to CERCLA section 122. 307.42 Section 307.42 Protection of...-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) CLAIMS... taken pursuant to CERCLA section 122. (a) In the case of the failure of a completed remedial...

  3. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... failure of remedial actions taken pursuant to CERCLA section 122. 307.42 Section 307.42 Protection of...-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) CLAIMS... taken pursuant to CERCLA section 122. (a) In the case of the failure of a completed remedial...

  4. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... failure of remedial actions taken pursuant to CERCLA section 122. 307.42 Section 307.42 Protection of...-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) CLAIMS... taken pursuant to CERCLA section 122. (a) In the case of the failure of a completed remedial...

  5. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... failure of remedial actions taken pursuant to CERCLA section 122. 307.42 Section 307.42 Protection of...-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) CLAIMS... taken pursuant to CERCLA section 122. (a) In the case of the failure of a completed remedial...

  6. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado

    SciTech Connect

    Not Available

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown.

  7. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... direct by notice to the project sponsor or land owner as having a potential substantial water quality... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Classification of projects for review under Section 3.8 of the Compact. 401.35 Section 401.35 Conservation of Power and...

  8. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... direct by notice to the project sponsor or land owner as having a potential substantial water quality... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Classification of projects for review under Section 3.8 of the Compact. 401.35 Section 401.35 Conservation of Power and...

  9. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... direct by notice to the project sponsor or land owner as having a potential substantial water quality... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Classification of projects for review under Section 3.8 of the Compact. 401.35 Section 401.35 Conservation of Power and...

  10. 76 FR 2371 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-13

    ... security cameras as part of a Security and Fire Alarm System Project. This is a project specific waiver and... determined that there are currently no domestically manufactured security cameras available to meet its... ARRA. This action permits the purchase of fourteen security cameras by the System, as specified in...

  11. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    SciTech Connect

    Not Available

    1993-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  12. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    SciTech Connect

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  13. 76 FR 45649 - Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange Project: Jackson County, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... Federal Highway Administration Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange... the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, I-5: Fern Valley... Administration, 530 Center Street, NE., Suite 420, Salem, Oregon 97301, Telephone: (503) 316-2559. The I-5:...

  14. Engaging Students in a Simulated Collaborative Action Research Project: An Evaluation of a Participatory Approach to Learning

    ERIC Educational Resources Information Center

    Congdon, Graham John; Congdon, Shirley

    2011-01-01

    This article reports an action research project designed to develop and implement a new participatory learning and teaching approach to enable postgraduate healthcare students to develop skills and knowledge in preparation for undertaking an action research study within their practice setting. The learning and teaching approach was based upon the…

  15. Community action for preventing HIV in Cambodia: evaluation of a 3-year project.

    PubMed

    Sopheab, Heng; Fylkesnes, Knut; Lim, Yi; Godwin, Peter

    2008-07-01

    The 'Community Action for Preventing HIV/AIDS Project' was implemented in four provinces in Cambodia (2001-04) to support a comprehensive set of HIV prevention efforts. Implementation was strictly monitored in terms of inputs, outputs and outcomes. We examine changes in these variables during the project period to assess the extent to which they were related to the project. Inputs and outputs were monitored regularly by supervision and quarterly project reports. Baseline and follow-up surveys were conducted on 10 target groups to measure changes in outcome indicators related to sexual risk behaviours, uses of HIV voluntary counselling and testing (VCT), self-reported sexually transmitted infections (STIs) and other indicators. The analyses use data from surveys and from project monitoring. Spending on HIV-related work at provincial level increased markedly, including investments in VCT, STI facilities and staff training. Yearly expenditure increased about 7-fold compared with years immediately preceding the project. VCT centres increased from 3 to 12, numbers of counsellors from 10 to 27, and numbers of client visits more than doubled. STI laboratory facilities increased from 0 to 6 with coverage of STI check-ups among sex workers increasing from 70% to 93% and a decline in men attending STI clinics. The survey results indicate significant changes in a number of major outcome indicators such as consistent condom use related to sex work (>80%), HIV testing and counselling after HIV tests, especially among police (42 to 72%, P < 0.001) and brothel-based sex workers (48 to 89%, P < 0.001). Self-reported STIs declined in most groups. Finally, the programmatic systems for planning, managing and monitoring implementation of activities at both central and provincial level, as well as technical guidelines, developed under the project have become the standard for the national programme. In conclusion, the project appears to have been comprehensive and a number of favourable

  16. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project - status of project to date January 1997

    SciTech Connect

    1998-04-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fourth year (1996) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). The fourth year at the Weldon Springs Site shows sustained progress as the project moves through the final design and into the remedial action phases of the Chemical Plant Operable Unit. The remedial action phase includes the Foundations Removal work package, Chemical Solidification and Stabilization, and disposal cell.

  17. A Fission Time Projection Chamber for High Precision Cross Section Measurements

    NASA Astrophysics Data System (ADS)

    Snyder, Lucas; Greife, Uwe

    2010-11-01

    The design of next generation nuclear reactors and other nuclear applications are increasingly dependent on advanced simulations. Sensitivity studies have shown a need for high precision nuclear data to improve the predictive capabilities of these simulations. The Neutron Induced Fission Fragment Tracking Experiment (NIFFTE) collaboration has constructed and is currently testing a prototype Time Projection Chamber (TPC) designed to measure fission cross sections to a higher accuracy than is capable with existing technology. In this talk, I will discuss the status of the fission TPC and progress on collecting the first set of data from ^252Cf spontaneous fission.

  18. 24 CFR 5.657 - Section 8 project-based assistance programs: Reexamination of family income and composition.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... programs: Reexamination of family income and composition. 5.657 Section 5.657 Housing and Urban Development...: Reexamination of family income and composition. (a) Applicability. This section states requirements for reexamination of family income and composition in the Section 8 project-based assistance programs, except...

  19. 24 CFR 5.657 - Section 8 project-based assistance programs: Reexamination of family income and composition.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... programs: Reexamination of family income and composition. 5.657 Section 5.657 Housing and Urban Development...: Reexamination of family income and composition. (a) Applicability. This section states requirements for reexamination of family income and composition in the Section 8 project-based assistance programs, except...

  20. 24 CFR 5.657 - Section 8 project-based assistance programs: Reexamination of family income and composition.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... programs: Reexamination of family income and composition. 5.657 Section 5.657 Housing and Urban Development...: Reexamination of family income and composition. (a) Applicability. This section states requirements for reexamination of family income and composition in the Section 8 project-based assistance programs, except...

  1. 24 CFR 5.657 - Section 8 project-based assistance programs: Reexamination of family income and composition.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... programs: Reexamination of family income and composition. 5.657 Section 5.657 Housing and Urban Development...: Reexamination of family income and composition. (a) Applicability. This section states requirements for reexamination of family income and composition in the Section 8 project-based assistance programs, except...

  2. 24 CFR 5.657 - Section 8 project-based assistance programs: Reexamination of family income and composition.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... programs: Reexamination of family income and composition. 5.657 Section 5.657 Housing and Urban Development...: Reexamination of family income and composition. (a) Applicability. This section states requirements for reexamination of family income and composition in the Section 8 project-based assistance programs, except...

  3. Reflecting the scope and work of palliative care teams today: an action research project to modernise a national minimum data set.

    PubMed

    Jack, B A; Littlewood, C; Eve, A; Murphy, D; Khatri, A; Ellershaw, J E

    2009-01-01

    The Minimum Data Set (MDS) for UK specialist palliative care services was developed in 1995 to provide annual data on palliative care services. Data collected is used for local and national purposes including service management, monitoring and audit, the commissioning of services and the development of national policy. The emergence of Payment by Results and HealthCare Resource Groups, which will have an impact on the funding processes, together with identified limitations of the current MDS resulted in a project to revise the MDS. An action research approach was used for the project and had distinctive phases including modifying the MDS, a pilot phase and an expert panel consultation. Modifications to all the sections of the MDS and changes to terminology were made. The action research approach enabled revisions made based upon a national consensus and met the changing provision of specialist palliative care services for the UK.

  4. A Time Projection Chamber for High Accuracy and Precision Fission Cross-Section Measurements

    SciTech Connect

    T. Hill; K. Jewell; M. Heffner; D. Carter; M. Cunningham; V. Riot; J. Ruz; S. Sangiorgio; B. Seilhan; L. Snyder; D. M. Asner; S. Stave; G. Tatishvili; L. Wood; R. G. Baker; J. L. Klay; R. Kudo; S. Barrett; J. King; M. Leonard; W. Loveland; L. Yao; C. Brune; S. Grimes; N. Kornilov; T. N. Massey; J. Bundgaard; D. L. Duke; U. Greife; U. Hager; E. Burgett; J. Deaven; V. Kleinrath; C. McGrath; B. Wendt; N. Hertel; D. Isenhower; N. Pickle; H. Qu; S. Sharma; R. T. Thornton; D. Tovwell; R. S. Towell; S.

    2014-09-01

    The fission Time Projection Chamber (fissionTPC) is a compact (15 cm diameter) two-chamber MICROMEGAS TPC designed to make precision cross-section measurements of neutron-induced fission. The actinide targets are placed on the central cathode and irradiated with a neutron beam that passes axially through the TPC inducing fission in the target. The 4p acceptance for fission fragments and complete charged particle track reconstruction are powerful features of the fissionTPC which will be used to measure fission cross-sections and examine the associated systematic errors. This paper provides a detailed description of the design requirements, the design solutions, and the initial performance of the fissionTPC.

  5. 75 FR 364 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... States of a satisfactory quality] to Valley City, ND for the Zenon ZeeWeed 1000 membrane filter... exception to Section 1605 of ARRA. This action permits the purchase of the Zenon ZeeWeed 1000 membrane...Weed 1000 model of submerged membranes which are manufactured in Canada. Section 1605 of the...

  6. Reducing Uncertainties in Neutron-Induced Fission Cross Sections Using a Time Projection Chamber

    NASA Astrophysics Data System (ADS)

    Manning, Brett; Niffte Collaboration

    2015-10-01

    Neutron-induced fission cross sections for actinides have long been of great interest for nuclear energy and stockpile stewardship. Traditionally, measurements were performed using fission chambers which provided limited information about the detected fission events. For the case of 239Pu(n,f), sensitivity studies have shown a need for more precise measurements. Recently the Neutron Induced Fission Fragment Tracking Experiment (NIFFTE) has developed the fission Time Projection Chamber (fissionTPC) to measure fission cross sections to better than 1% uncertainty by providing 3D tracking of fission fragments. The fissionTPC collected data to calculate the 239Pu(n,f) cross section at the Weapons Neutron Research facility at the Los Alamos Neutron Science Center during the 2014 run cycle. Preliminary analysis has been focused on studying particle identification and target and beam non-uniformities to reduce the uncertainty on the cross section. Additionally, the collaboration is investigating other systematic errors that could not be well studied with a traditional fission chamber. LA-UR-15-24906.

  7. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    SciTech Connect

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  8. Simulated lesion, human observer performance comparison between thin-section dedicated breast CT images versus computed thick-section simulated projection images of the breast.

    PubMed

    Chen, L; Boone, J M; Abbey, C K; Hargreaves, J; Bateni, C; Lindfors, K K; Yang, K; Nosratieh, A; Hernandez, A; Gazi, P

    2015-04-21

    The objective of this study was to compare the lesion detection performance of human observers between thin-section computed tomography images of the breast, with thick-section (>40 mm) simulated projection images of the breast. Three radiologists and six physicists each executed a two alterative force choice (2AFC) study involving simulated spherical lesions placed mathematically into breast images produced on a prototype dedicated breast CT scanner. The breast image data sets from 88 patients were used to create 352 pairs of image data. Spherical lesions with diameters of 1, 2, 3, 5, and 11 mm were simulated and adaptively positioned into 3D breast CT image data sets; the native thin section (0.33 mm) images were averaged to produce images with different slice thicknesses; average section thicknesses of 0.33, 0.71, 1.5 and 2.9 mm were representative of breast CT; the average 43 mm slice thickness served to simulate simulated projection images of the breast.The percent correct of the human observer's responses were evaluated in the 2AFC experiments. Radiologists lesion detection performance was significantly (p < 0.05) better in the case of thin-section images, compared to thick section images similar to mammography, for all but the 1 mm lesion diameter lesions. For example, the average of three radiologist's performance for 3 mm diameter lesions was 92% correct for thin section breast CT images while it was 67% for the simulated projection images. A gradual reduction in observer performance was observed as the section thickness increased beyond about 1 mm. While a performance difference based on breast density was seen in both breast CT and the projection image results, the average radiologist performance using breast CT images in dense breasts outperformed the performance using simulated projection images in fatty breasts for all lesion diameters except 11 mm. The average radiologist performance outperformed that of the average physicist observer, however trends

  9. Simulated lesion, human observer performance comparison between thin-section dedicated breast CT images versus computed thick-section simulated projection images of the breast

    PubMed Central

    Chen, L; Boone, JM; Abbey, CK; Hargreaves, J; Bateni, C; Lindfors, KK; Yang, K; Nosratieh, A; Hernandez, A; Gazi, P

    2015-01-01

    Objectives The objective of this study was to compare the lesion detection performance of human observers between thin-section computed tomography images of the breast, with thick-section (>40 mm) simulated projection images of the breast. Methods Three radiologists and six physicists each executed a two alterative force choice (2AFC) study involving simulated spherical lesions placed mathematically into breast images produced on a prototype dedicated breast CT scanner. The breast image data sets from 88 patients were used to create 352 pairs of image data. Spherical lesions with diameters of 1, 2, 3, 5, and 11 mm were simulated and adaptively positioned into 3D breast CT image data sets; the native thin section (0.33 mm) images were averaged to produce images with different slice thicknesses; average section thicknesses of 0.33 mm, 0.71 mm, 1.5 mm, and 2.9 mm were representative of breast CT; the average 43 mm slice thickness served to simulate simulated projection images of the breast. Results The percent correct of the human observer’s responses were evaluated in the 2AFC experiments. Radiologists lesion detection performance was significantly (p<0.05) better in the case of thin-section images, compared to thick section images similar to mammography, for all but the 1 mm lesion diameter lesions. For example, the average of three radiologist’s performance for 3 mm diameter lesions was 92 % correct for thin section breast CT images while it was 67 % for the simulated projection images. A gradual reduction in observer performance was observed as the section thickness increased beyond about 1 mm. While a performance difference based on breast density was seen in both breast CT and the projection image results, the average radiologist performance using breast CT images in dense breasts outperformed the performance using simulated projection images in fatty breasts for all lesion diameters except 11 mm. The average radiologist performance outperformed that of the

  10. Science in Action: How Middle School Students Are Changing Their World through STEM Service-Learning Projects

    ERIC Educational Resources Information Center

    Newman, Jane L.; Dantzler, John; Coleman, April N.

    2015-01-01

    The purpose of Science in Action (SIA) was to examine the relationship between implementing quality science, technology, engineering, and math (STEM) service-learning (SL) projects and the effect on students' academic engagement in middle school science, civic responsibility, and resilience to at-risk behaviors. The innovative project funded…

  11. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1

    SciTech Connect

    Findlay, Rick

    2006-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.

  12. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995

    SciTech Connect

    1995-12-01

    This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  13. Diagnostic accuracy of remote frozen sections compared with paraffin-embedded sections: a telepathology project in Austria

    NASA Astrophysics Data System (ADS)

    Moser, Patrizia; Soegner, Peter I.; Stadlmann, Sonja; Jacobs, Jan; Mikuz, Gregor

    2000-04-01

    The purpose of the present study was to evaluate the diagnostic accuracy of remote frozen sections examined by telepathology. The gold standard was the diagnosis made using direct examination of paraffin-embedded sections. A consecutive series of 134 frozen-section cases were examined by six qualified pathologists. We used the Zeiss telepathology system with robot microscopy, which allowed different magnifications and fields of view to be chosen. The wide-area network used the TCP/IP protocol. The diagnosis made on the frozen sections was compared with the final diagnosis in the paraffin-embedded sections. Times were recorded for each telepathology session, as well as the users comments on usability and software, and on any communication problems which occurred. In addition, we evaluated the importance of the macroscopic sampling of the surgical specimen, applied to each type of tissue. The diagnostic evaluation showed complete agreement in approximately 80% of cases, in 20% diagnosis was not possible due to insufficient quality of the slides. The median time for the telemedicine diagnosis was 14 min 30 sec.

  14. 26 CFR 301.7430-8 - Administrative costs incurred in damage actions for violations of section 362 or 524 of the...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 18 2011-04-01 2011-04-01 false Administrative costs incurred in damage actions for violations of section 362 or 524 of the Bankruptcy Code. 301.7430-8 Section 301.7430-8 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION...

  15. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    SciTech Connect

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  16. Financial and tax risks at implementation of "Chayanda- Lensk" section of "Sila Sibiri" gas transportation system construction project

    NASA Astrophysics Data System (ADS)

    Sharf, I. V.; Chukhareva, N. V.; Kuznetsova, L. P.

    2014-08-01

    High social and economic importance of large-scale projects on gasification of East Siberian regions of Russia and diversifying gas exports poses the problem of complex risk analysis of the project. This article discusses the various types of risks that could significantly affect the timing of the implementation and effectiveness of the project for the construction of the first line of "Sila Sibiri", the "Chayanda-Lensk" section. Special attention is paid to financial and tax aspects of the project. Graphically presented analysis of the dynamics of financial indicators reflect certain periods of effectiveness in implementing the project. Authors also discuss the possible causes and consequences of risks.

  17. Towards a Reflection Repertoire: Using a Thinking Tool to Understand Tensions in an Action Research Project

    ERIC Educational Resources Information Center

    Aas, Marit

    2014-01-01

    Most action researchers agree that action research consists of cycles of planning, acting, reflecting, and taking further action. However, in action research literature, there is something missing. The nature of reflection in the action research process, including its relationship with the tensions that arise while discussing purposes, processes,…

  18. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    SciTech Connect

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal.

  19. Practicum in adapted physical activity: a Dewey-inspired action research project.

    PubMed

    Standal, Øyvind; Rugseth, Gro

    2014-07-01

    The purpose of this study was to investigate what adapted physical activity (APA) students learn from their practicum experiences. One cohort of APA students participated, and data were generated from an action research project that included observations, reflective journals, and a focus group interview. The theoretical framework for the study was Dewey's and Wackerhausen's theories of reflections. The findings show the objects of students' reflections, the kind of conceptual resources they draw on while reflecting, and their knowledge interests. In addition, two paradoxes are identified: the tension between reflecting from and on own values, and how practicum as a valued experience of reality can become too difficult to handle. In conclusion, we reflect on how practicum learning can be facilitated.

  20. 76 FR 62404 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-07

    ... Reuse Project--Waste Water Treatment Facility. The required carbon steel pipe fittings and appurtenances... the proposed waste water treatment system. EPA has also evaluated the City's request to determine if... project waiver is the authorization provided in ARRA, Section 1605(b) (2). Due to the lack of...

  1. 75 FR 25241 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ...-speed, high-efficiency magnetic bearing turbo- compressors that will be used in the city's sludge... product must apply for a separate waiver based on project-specific circumstances. These turbo- compressors.... This action permits the purchase of high-speed, high-efficiency magnetic bearing turbo- compressors...

  2. 76 FR 22122 - Section 8 Housing Choice Voucher Program-Demonstration Project of Small Area Fair Market Rents in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... response to a May 18, 2010, notice (75 FR 27808) announcing HUD's intent to operate a small area FMR... are available electronically at http://www.gpo.gov/fdsys/browse/collection.action?collectionCode=FR... Federal Register (75 FR 27808) seeking public comment on a small area FMR demonstration project....

  3. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada, Rev. No.: 0

    SciTech Connect

    Rick Findlay

    2006-09-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation.

  4. The Impact of a Dual-Project Action Learning Program: A Case of a Large IT Manufacturing Company in South Korea

    ERIC Educational Resources Information Center

    Yoon, Hyung Joon; Cho, Yonjoo; Bong, Hyeon-Cheol

    2012-01-01

    The primary purpose of this article is to evaluate the impact of a dual-project action learning program (DPALP) conducted in South Korea. A dual-project program requires each participant to carry out both team and individual projects. Cho and Egan's [2009. Action learning research: A systematic review and conceptual framework. "Human Resource…

  5. 75 FR 6387 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... Troy, Vermont (``Town'') for the purchase of foreign manufactured butterfly valves and actuators for an... that there are currently no domestic manufactured butterfly valves and actuators available to meet its... exception to Section 1605 of ARRA. This action permits the purchase of foreign manufactured butterfly...

  6. Nurse-led action research project for expanding nurses’ role in patient education in Iran: Process, structure, and outcomes

    PubMed Central

    Khorasani, Parvaneh; Rassouli, Maryam; Parvizy, Soroor; Zagheri-Tafreshi, Mansoureh; Nasr-Esfahani, Mahmood

    2015-01-01

    Background: Patient education is among the lowest met need of patients in Iran; therefore, expansion of that role can result in greater professional accountability. This study aimed to explain the practical science of the process, structure, and outcomes of a nurse-led action research project to expand the nurses’ role in patient education in Iran. Materials and Methods: This study was part of a participatory action research. Daily communications and monthly joint meetings were held from January 2012 to February 2014 for planning and management. These were based on the research protocol, and the conceptual framework included the Mobilizing for Action through Planning and Partnerships process by means of Leadership for Change skills. Data were produced and gathered through participant observations. Administrative data included project records, official documents, artifacts, news, and reports, which were analyzed through qualitative content analysis. Results: A participatory project was established with three groups of participants organized from both academic and clinical fields. These consisted of a “core research support team,” “two steering committees,” and community representatives of clients and professionals as “feedback groups.” A seven-stage process, named the “Nurse Educators: Al-Zahra Role Expansion Action Research” (NEAREAR) process, resulted from the project, in which strategic issues were gradually developed and implemented through 32 action plans and quality improvement cycles of action research. Audits and supervision evaluations showed meaningful changes in capacity building components. Conclusions: A nurse-led ad hoc structure with academic–clinical partnerships and strategic management process was suggested as a possible practical model for expanding nurses’ educational role in similar contexts. Implications and practical science introduced in this action research could also be applicable for top managers and health system

  7. 24 CFR 402.7 - Refusal to consider an owner's request for a Section 8 contract renewal because of actions or...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER SECTION 524 OF MAHRA § 402.7... owner or affiliate. (a) Determination of eligibility. Notwithstanding 2 CFR part 2424, HUD may elect to...: (1) The owner or an affiliate is debarred or suspended under part 2 CFR part 2424; (2) HUD...

  8. 24 CFR 402.7 - Refusal to consider an owner's request for a Section 8 contract renewal because of actions or...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER SECTION 524 OF MAHRA § 402.7... owner or affiliate. (a) Determination of eligibility. Notwithstanding 2 CFR part 2424, HUD may elect to...: (1) The owner or an affiliate is debarred or suspended under part 2 CFR part 2424; (2) HUD...

  9. 24 CFR 402.7 - Refusal to consider an owner's request for a Section 8 contract renewal because of actions or...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER SECTION 524 OF MAHRA § 402.7... owner or affiliate. (a) Determination of eligibility. Notwithstanding 2 CFR part 2424, HUD may elect to...: (1) The owner or an affiliate is debarred or suspended under part 2 CFR part 2424; (2) HUD...

  10. 24 CFR 402.7 - Refusal to consider an owner's request for a Section 8 contract renewal because of actions or...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER SECTION 524 OF MAHRA § 402.7... owner or affiliate. (a) Determination of eligibility. Notwithstanding 2 CFR part 2424, HUD may elect to...: (1) The owner or an affiliate is debarred or suspended under part 2 CFR part 2424; (2) HUD...

  11. 24 CFR 402.7 - Refusal to consider an owner's request for a Section 8 contract renewal because of actions or...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER SECTION 524 OF MAHRA § 402.7... owner or affiliate. (a) Determination of eligibility. Notwithstanding 2 CFR part 2424, HUD may elect to...: (1) The owner or an affiliate is debarred or suspended under part 2 CFR part 2424; (2) HUD...

  12. 42 CFR 137.325 - What does a Self-Governance Tribe do if it wants to perform a construction project under section...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... perform a construction project under section 509 of the Act ? 137.325 Section 137.325 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.325 What does a Self-Governance Tribe do if it wants to perform a construction project under section 509 of the Act ? (a) A...

  13. 42 CFR 137.325 - What does a Self-Governance Tribe do if it wants to perform a construction project under section...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... perform a construction project under section 509 of the Act ? 137.325 Section 137.325 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.325 What does a Self-Governance Tribe do if it wants to perform a construction project under section 509 of the Act ? (a) A...

  14. 42 CFR 137.325 - What does a Self-Governance Tribe do if it wants to perform a construction project under section...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... perform a construction project under section 509 of the Act ? 137.325 Section 137.325 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.325 What does a Self-Governance Tribe do if it wants to perform a construction project under section 509 of the Act ? (a) A...

  15. 42 CFR 137.325 - What does a Self-Governance Tribe do if it wants to perform a construction project under section...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... perform a construction project under section 509 of the Act ? 137.325 Section 137.325 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.325 What does a Self-Governance Tribe do if it wants to perform a construction project under section 509 of the Act ? (a) A...

  16. 42 CFR 137.325 - What does a Self-Governance Tribe do if it wants to perform a construction project under section...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... perform a construction project under section 509 of the Act ? 137.325 Section 137.325 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.325 What does a Self-Governance Tribe do if it wants to perform a construction project under section 509 of the Act ? (a) A...

  17. 2012 Groundwater Monitoring Report Project Shoal Area Subsurface Corrective Action Unit 447

    SciTech Connect

    2013-03-01

    The Project Shoal Area (PSA) in Nevada was the site of a 12-kiloton underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. Analytical results from the 2012 monitoring are consistent with those of the previous years, with tritium detected only in well HC-4. The tritium concentration in groundwater from well HC-4 remains far below the U.S. Environmental Protection Agency-established maximum contaminant level of 20,000 picocuries per liter. Concentrations of total uranium and gross alpha were also detected during this monitoring period, with uranium accounting for nearly all the gross alpha activity. The total uranium concentrations obtained from this monitoring period were consistent with previous results and reflect a slightly elevated natural uranium concentration, consistent with the mineralized geologic terrain. Isotopic ratios of uranium also indicate a natural source of uranium in groundwater, as opposed to a nuclear-test-related source. Water level trends obtained from the 2012 water level data were consistent with those of previous years. The corrective action strategy for the PSA is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the current monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. While water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an

  18. Weldon Spring Site environmental report for calendar year 1993. Weldon Springs Site Remedial Action Project

    SciTech Connect

    Not Available

    1994-05-01

    This Site Environmental Report for Calendar Year 1993 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels, and to summarize trends and/or changes in contaminant concentrations from environmental monitoring program. In 1993, the maximum committed dose to a hypothetical individual at the chemical plant site perimeter was 0.03 mrem (0.0003 mSv). The maximum committed dose to a hypothetical individual at the boundary of the Weldon Spring Quarry was 1.9 mrem (0.019 mSv). These scenarios assume an individual walking along the perimeter of the site-once a day at the chemical plant/raffinate pits and twice a day at the quarry-250 days per year. This hypothetical individual also consumes fish, sediment, and water from lakes and other bodies of water in the area. The collective dose, based on an effected population of 112,000 was 0.12 person-rem (0.0012 person-Sv). This calculation is based on recreational use of the August A. Busch Memorial Conservation Area and the Missouri Department of Conservation recreational trail (the Katy Trail) near the quarry. These estimates are below the U.S. Department of Energy requirement of 100 mrem (I mSv) annual committed effective dose equivalent for all exposure pathways. Results from air monitoring for the National Emission Standards for Hazardous Air Pollutants (NESHAPs) program indicated that the estimated dose was 0.38 mrem, which is below the U.S. Environmental Protection Agency (EPA) standard of 10 mrem per year.

  19. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    SciTech Connect

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state`s 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs.

  20. Toward Solutions: The Work of the Biology Action-Research Group. Learning in Science Project. Working Paper No. 29.

    ERIC Educational Resources Information Center

    Boe, Robyn; And Others

    Many students, even after formal science instruction, have not developed a scientifically acceptable concept of "living,""animal," or "plant." Therefore, as part of the action-research phase of the Learning in Science Project, a working group was formed to explore (with teachers) some possible strategies aimed at modifying students' current…

  1. 77 FR 66215 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York Correction In notice document 2012-26799, appearing on page 65929 in the...

  2. Exclusion in an Inclusive Action Research Project: Drawing on Student Perspectives of School Science to Identify Discourses of Exclusion

    ERIC Educational Resources Information Center

    Nystrom, Eva

    2007-01-01

    This article reports on the outcomes of an action research project on gender and science education carried out in two upper secondary schools in Sweden. The article focuses on how student voices draw on wider societal discourses when they talk about what it means to be natural science students at the beginning of the twenty-first century. The…

  3. From Idea to Action: Promoting Responsible Management Education through a Semester-Long Academic Integrity Learning Project

    ERIC Educational Resources Information Center

    Lavine, Marc H.; Roussin, Christopher J.

    2012-01-01

    The authors describe a semester-long action-learning project where undergraduate or graduate management students learn about ethics, responsibility, and organizational behavior by examining the policy of their college or university that addresses academic integrity. Working in teams, students adopt a stakeholder management approach as they make…

  4. "What Happened to Our Sense of Justice?" Tracing Agency and Critical Engagement in a Youth Participatory Action Research Project

    ERIC Educational Resources Information Center

    Giraldo-García, Regina J.; Galletta, Anne

    2015-01-01

    Tracing the nature of critical engagement and agency among youth in a participatory action research (PAR) collective, the study attends to the manner in which critical engagement and agency developed over time for the youth researchers. The focus of the project was to conduct a survey among ninth grade students concerning their early high school…

  5. An Action Research Project to Determine the Utility of Bully Prevention in Positive Behavior Support for Elementary School Bullying Prevention

    ERIC Educational Resources Information Center

    Goodman-Scott, Emily; Doyle, Beth; Brott, Pamelia

    2014-01-01

    A trio of researchers presents a case study from a practical, participatory action research project to demonstrate how one school district implemented a school-wide bullying prevention initiative for all elementary schools based on Bully Prevention in Positive Behavior Support (BP-PBS). The purpose of this manuscript is to discuss the process of…

  6. Collaborative Action Research as a Tool for Generating Formative Feedback on Teachers' Classroom Assessment Practice: The KREST Project

    ERIC Educational Resources Information Center

    Harrison, Christine

    2013-01-01

    This paper sets out to explore science teachers' classroom assessment practices and outlines some of the tensions and synergies in changing assessment practices. It describes episodes from a collaborative action research project with science teachers designed to support the strengthening of classroom assessment practices--the King's…

  7. Making Space for Democracy through Assessment and Feedback in Higher Education: Thoughts from an Action Research Project in Education Studies

    ERIC Educational Resources Information Center

    McDonnell, Jane; Curtis, Will

    2014-01-01

    This paper reports on an action research project into the development of a "democratic feedback model" with students on an education studies programme at a post-1992 university in the UK. Building on work that has explored the dialogic dimensions of assessment and feedback, the research explored the potential for more…

  8. 20 CFR 641.600 - What is the purpose of the private sector training projects authorized under section 502(e) of...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... business concerns. In addition, the OAA provides section 502(e) grantees or contractors with opportunities... training projects authorized under section 502(e) of the OAA? 641.600 Section 641.600 Employees' Benefits... EMPLOYMENT PROGRAM Private Sector Training Projects Under Section 502(e) of the OAA § 641.600 What is...

  9. Radiation Protection Considerations at USACE Formerly Utilized Sites Remedial Action Program (FUSRAP) Projects

    SciTech Connect

    Brown, S.H.

    2008-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was initially authorized by Congress in 1974. FUSRAP was enacted to address residual radioactive contamination associated with numerous sites across the U.S. at which radioactive material (primarily Uranium ores and related milling products) had been processed in support of the nation's nuclear weapons program dating back to the Manhattan Project and the period immediately following World War II. In October 1997, Congress transferred the management of this program from the Department of Energy to the United States Corp of Engineers. Through this program, the Corps addresses the environmental remediation of certain sites once used by DOE's predecessor agencies, the Manhattan Engineer District and the Atomic Energy Commission. The waste at FUSRAP sites consists mainly of low levels of uranium, thorium and radium, along with some mixed wastes. Upon completion of remedial activities, these sites are transferred to DOE for long-term stewardship activities. This paper presents and contrasts the radiological conditions and recent monitoring results associated with five large ongoing FUSRAP projects including Maywood, N.J.; the Linde site near Buffalo, N.Y.; Colonie in Albany N.Y. and the St Louis, Mo. airport and downtown sites. The radiological characteristics of soil and debris at each site and respective regulatory clean up criteria is presented and contrasted. Some differences are discussed in the radiological characteristics of material at some sites that result in variations in radiation protection monitoring programs. Additionally, summary data for typical personnel radiation exposure monitoring results are presented. In summary: 1. The FUSRAP projects for which data and observations are reported in this paper are considered typical of the radiological nature of FUSRAP sites in general. 2. These sites are characterized by naturally occurring uranium and thorium series radionuclides in soil and debris, at

  10. Searching for New Directions: Developing MA Action Research Project as a Tool for Teaching

    ERIC Educational Resources Information Center

    Lee, Young Ah; Wang, Ye

    2012-01-01

    Action research has been recognized as a useful professional development tool for teaching, but for inservice teachers, conducting action research can be challenging. Their learning about action research can be influenced by social situations--whether in an MA (Master of Arts) program or other professional development. The purpose of this…

  11. Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the ..Section..1603 Treasury Grant Program

    SciTech Connect

    Steinberg, D.; Porro, G.; Goldberg, M.

    2012-04-01

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the Section 1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the Section 1603 grant program.

  12. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of preliminary examination and survey reports. (b) Non-Federal responsibilities for dam and reservoir project. All new projects under this authority, including dams and reservoirs, are considered local protection projects. Non-Federal responsibilities for such dams and reservoirs will thus include the...

  13. Section method for projected structures of icosahedral quasicrystals and its application to electron-microscopy-image and surface analyses.

    PubMed

    Yamamoto, Akiji

    2004-11-01

    A section method for projected structures of icosahedral quasicrystals (IQCs) is given. A structure projected along a specified direction can be calculated directly from a six-dimensional periodic structure by this method. The method concludes that all peaks in high-resolution transmission electron-microscopy images of an IQC have different projected atom densities in general and leads to different chemical compositions and densities for all atom layers, suggesting that all surfaces of an IQC are different. Its application to icosahedral Al-Pd-Mn quasicrystals is shown.

  14. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  15. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  16. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  17. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  18. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  19. Community based needs assessment in an urban area; A participatory action research project

    PubMed Central

    2012-01-01

    Background Community assessment is a core function of public health. In such assessments, a commitment to community participation and empowerment is at the heart of the WHO European Healthy Cities Network, reflecting its origins in health for all and the Ottawa Charter for Health Promotion. This study employs a participation and empowerment plan in order to conduct community assessment. Methods The method of participatory action research (PAR) was used. The study was carried out in an area of high socio-economic deprivation in Ardabil, a city in the northwest of Iran, which is currently served by a branch of the Social Development Center (SDC). The steering committee of the project was formed by some university faculty members, health officials and delegates form Farhikhteh non-governmental organization and representatives from twelve blocks or districts of the community. Then, the representatives were trained and then conducted focus groups in their block. The focus group findings informed the development of the questionnaire. About six hundred households were surveyed and study questionnaires were completed either during face-to-face interviews by the research team (in case of illiteracy) or via self-completion. The primary question for the residents was: 'what is the most important health problem in your community? Each health problem identified by the community was weighted based on the frequency it was selected on the survey, and steering committee perception of the problem's seriousness, urgency, solvability, and financial load. Results The main problems of the area appeared to be the asphalt problem, lack of easy access to medical centers, addiction among relatives and unemployment of youth. High participation rates of community members in the steering committee and survey suggest that the PAR approach was greatly appreciated by the community and that problems identified through this research truly reflect community opinion. Conclusions Participatory action

  20. The Framework: Toward Action Research. Learning in Science Project. Working Paper No. 28.

    ERIC Educational Resources Information Center

    Osborne, Roger; And Others

    Two previous papers of the Learning in Science Project recorded the thinking of the project team at the outset of the exploratory and in-depth phases of the project. This paper briefly reconsiders the work done in the in-depth phase and then discusses some central issues and tentative ideas as the project moves into the third and final…

  1. What Does It Mean to Be a Friendly Outsider? Critical Reflection on Finding a Role as an Action Researcher with Communities Developing Renewable Energy Projects

    ERIC Educational Resources Information Center

    Rogers, Jennifer; Convery, Ian; Simmons, Eunice; Weatherall, Andrew

    2012-01-01

    This paper is a reflective account exploring the value of using action research in a relatively new context in the United Kingdom; the development of community renewable-energy projects. There is a strong rationale for using action research in this setting due to the synergies between the principles and practice of action research and localised…

  2. 75 FR 5586 - Notice of a Regional Project Waiver of Section 1605 (Buy American Requirement) of the American...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... cartridges. The WMTMUA's proposed upgrade of its Awosting Sewage Treatment Plant to a MBR facility requires... WMTMUA's technical design specifications for its sewage treatment plant upgrade project. Section 1605 of... manufactured by Kubota of Japan, as part of WMTMUA's proposed upgrade of its Awosting Sewage Treatment Plant...

  3. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-10

    ... several states. Southwestern operates and maintains 1,380 miles of high voltage transmission lines in... Dakota, Texas, Utah, and Wyoming. Western's 17,000-mile high-voltage transmission system carries... Transmission Line Projects under section 1222 of EPAct (73 FR 70636 and 70638 respectively)....

  4. Colorado economic impact study on the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    SciTech Connect

    Not Available

    1993-11-12

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1993. To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are: Direct employment was estimated at 894 workers; An estimated 89 percent of all direct employment was local; Secondary employment resulting from remedial action at the active Colorado UMTRA Project sites and the Grand Junction vicinity property program is estimated at 546 workers. Total employment (direct and secondary) is estimated at 1440 workers for the period of study (July 1, 1992, to June 30, 1993). An estimated $24.1 million was paid in wages to UMTRA workers in Colorado during FY1993; Direct and secondary wage earnings were estimated at $39.9 million; Income tax payments to the state of Colorado were estimated at $843,400 during FY1993; The gross economic impact of UMTRA Project activities in the state of Colorado is estimated at $70 million during the 1-year study period; and the net economic benefit to the state of Colorado was estimated at $57.5 million, or $5.90 per dollar of funding provided by Colorado. This figure includes both direct and secondary benefits but does not include the impact of alternative uses of the state funding.

  5. 76 FR 34962 - Project Waiver of Section 1605 (Buy American Requirements) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ...- manufactured Heating,Ventilation, Air Conditioning (HVAC) equipment for an adaptive reuse renovation project... waiver based on project-specific circumstances. The County-proposed HVAC improvements were selected to... County and its consultants, it was determined that the HVAC equipment that will meet the County's...

  6. Project CABE 1986-1987: O.E.A. Evaluation Section Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Bilingual Education.

    The report describes first-year activities of Project CABE (Content-Area Bilingual Education) which aims to improve instruction and increase parental involvement for limited-English-proficient Spanish-speaking students with handicapping conditions in grades 4 through 9. During its first year the project served 308 students attending 25 public…

  7. PREFACE TO SPECIAL SECTION: SOUTHERN OXIDANTS STUDY 1999 ATLANTA SUPERSITE PROJECT (SOS3)

    EPA Science Inventory

    The Atlanta Supersites Project consisted of a one-month intensive field program to compare advanced methods for measurement of PM2.5 mass, chemical composition, including single particle composition in real-time, and aerosol precursor species. The project was the first of EPA's ...

  8. Project Recurso, 1988-89. Evaluation Section Report [and] Executive Summary. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Lista, Carlos A.

    Project Recurso, funded through Title VII of the Elementary and Secondary Education Act, was implemented at 12 elementary schools under the aegis of the Office of Bilingual Services, Division of Special Education of the New York City Board of Education. The project provided instructional services to 321 special education Spanish-speaking students…

  9. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    SciTech Connect

    Not Available

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work.

  10. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.

  11. YouthAccess to Alcohol: early findings from a community action project to reduce the supply of alcohol to teens.

    PubMed

    Clark, Sam

    2007-01-01

    The Youth Access to Alcohol (YATA) project was implemented in 2002 by the Alcohol Advisory Council of New Zealand (ALAC) in thirty communities in New Zealand, with the aim of reducing the harm experienced by young people as a result of alcohol misuse in New Zealand through reducing the supply of alcohol by adults to young people. The communities include a mix of rural and urban from both Islands in New Zealand. The project uses a community action approach, which has included setting up collaborative partnerships of key agencies, the delivery of key strategies, and multimedia awareness raising campaigns. The communities are encouraged to identify unique issues in their community regarding alcohol abuse and young people and to develop action plans incorporating a range of strategies that include tested strategies as well as innovative ideas. Communities are trained to implement several tools to monitor changes in their community over time. The study's limitations are noted and future needed research is suggested. PMID:18075928

  12. Studying Pond Life with Primary-Age Children: The Project Approach in Action.

    ERIC Educational Resources Information Center

    Warner, Laverne; Morse, Pam

    2001-01-01

    Describes the development, implementation, and results of a pond life elementary student research project. Utilizing the pond life example, provides guidelines for children's research projects including the implementation of the K-W-L (know-want to know- learned) strategy with the children's reports/projects. Provides resources utilized in the…

  13. Using a Time Projection Chamber to Measure High Precision Neutron-Induced Fission Cross Sections

    SciTech Connect

    Manning, Brett

    2015-08-06

    2014 LANSCE run cycle data will provide a preliminary 239Pu(n,f) cross section and will quantify uncertainties: PID and Target/beam non-uniformities. Continued running during the 2015 LANSCE run cycle: Thin targets to see both fission fragments and 239Pu(n,f) cross section and fully quantified uncertainties

  14. 77 FR 34456 - Notice of Final Federal Agency Actions on the Newberg Dundee Bypass Project Project: Yamhill and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ...(k). 8. Wetlands and Water Resources: Clean Water Act ; Safe Drinking Water Act (SDWA) ; Rivers and... project will build an 11-mile, four- travel lane, access-controlled expressway (Bypass) with four... Transportation Equity Act: A Legacy for Users [SAFETEA-LU--23 U.S.C. 139]. 2. Air: Clean Air Act . 3....

  15. Perspectives from Ethiopia regarding U.S. military humanitarian assistance: how to build a better medical civil action project (MEDCAP).

    PubMed

    Miles, Shana; Malone, Joseph L

    2013-12-01

    Assuming that budgetary constraints continue over the next several years, the U.S. military's overseas medical activities including medical civic action projects (MEDCAPs) and humanitarian assistance projects could comprise an increasing proportion of the contributions of U.S. government (USG) to improving global health. We have identified several issues with MEDCAPs in Ethiopia since 2009 that resulted in delays or project cancellations. These were mostly related to lack of a plan to develop sustainable capacities. Although there are many obvious medical needs for civilian populations in Ethiopia, the provision of sustainable development assistance involving these Ethiopian populations on behalf of the USG is a complex undertaking involving coordination with many partners and coordination with several other USG agencies. Military medical professionals planning MEDCAPs and other cooperative global health projects would benefit from consultation and close coordination with U.S. Centers for Disease Control and Prevention (CDC) and U.S. Agency of International Development (USAID) experts who are involved in supporting medium- and long-term health projects in Ethiopia. The establishment of durable military medical academic relationships and involvement of overseas military medical research units could also help promote sustainable projects and build robust professional relationships in global health. PMID:24306018

  16. 75 FR 69889 - Extension of Deadline for Action on the Second Section 126 Petition From New Jersey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... Department of Environmental Protection (New Jersey) pursuant to section 126 of the Clean Air Act (CAA). The... 13045 (62 FR 19885, April 23, 1997) because the Agency does not believe the environmental health risks... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL...

  17. 78 FR 67182 - Announcement of Funding Awards for the Section 811 Project Rental Assistance Demonstration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND... project based rental assistance funds to state housing finance agencies to award and administer to... Assistance Demonstration Program Awards Grantee Units Amount Funded California Housing Finance Agency 335...

  18. Bilingual Academic Computer and Technology Oriented Program: Project COM-TECH. Evaluation Section Report. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Plotkin, Donna

    Project COM-TECH offered bilingual individualized instruction, using an enrichment approach, to Spanish- and Haitian Creole-speaking students with varying levels of English and native language proficiency and academic preparation. The program provided supplementary instruction in English as a Second Language (ESL); Native Language Arts (NLA); and…

  19. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Agencies qualified under 24 CFR part 883 to refund bonds which financed projects assisted pursuant to 24 CFR part 883, HUD requires compliance with the prohibition on duplicative fees contained in 24 CFR... Agency's performance in serving the targeted income eligible population. Savings may be used for...

  20. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Agencies qualified under 24 CFR part 883 to refund bonds which financed projects assisted pursuant to 24 CFR part 883, HUD requires compliance with the prohibition on duplicative fees contained in 24 CFR... Agency's performance in serving the targeted income eligible population. Savings may be used for...

  1. Wisconsin Title I Migrant Education. Section 143 Project: Development of an Item Bank. Summary Report.

    ERIC Educational Resources Information Center

    Brown, Frank N.; And Others

    The successful Wisconsin Title 1 project item bank offers a valid, flexible, and efficient means of providing migrant student tests in reading and mathematics tailored to instructor curricula. The item bank system consists of nine PASCAL computer programs which maintain, search, and select from approximately 1,000 test items stored on floppy disks…

  2. Statistics in Action: The Story of a Successful Service-Learning Project

    ERIC Educational Resources Information Center

    DeHart, Mary; Ham, Jim

    2011-01-01

    The purpose of this article is to share the stories of an Introductory Statistics service-learning project in which students from both New Jersey and Michigan design and conduct phone surveys that lead to publication in local newspapers; to discuss the pedagogical benefits and challenges of the project; and to provide information for those who…

  3. Uranium Mill Tailings Remedial Action Project, fiscal year 1995 annual report to stakeholders

    SciTech Connect

    1995-09-30

    In 1978, Congress authorized the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping projects. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about both phases of the UMTRA Project. DOE`s UMTRA Project is the world`s largest materials management project ever undertaken to reduce or eliminate risk to the general public from exposure to potentially hazardous and radioactive materials. With an estimated cost at completion of nearly $2 billion for both phases of the UMTRA Project, and with the responsibility for encapsulating and isolating almost one-fourth of all the uranium mill tailings generated across the entire US (more than 44 million cubic yards), the UMTRA Project and its people have achieved a long record of safely and effectively completing its mission. It continually enhances its national reputation through its diligent process and cost efficiency as well as its international recognition for its technological innovation.

  4. From Disenchantment to Dialogue and Action: The "Transforming Community" Project at Emory University

    ERIC Educational Resources Information Center

    Harris, Leslie M.; Usher, Jody

    2008-01-01

    In this article, the authors describe the "Transforming Community Project" (TCP) at Emory University. Emory University is large and dispersed: It comprises approximately 2,700 faculty, 6,400 staff members, and 12,300 students across nine academic divisions. The Transforming Community Project is oriented to both process and product. The process of…

  5. Engaging Young Adolescents in Social Action through Photovoice: The Youth Empowerment Strategies (YES!) Project

    ERIC Educational Resources Information Center

    Wilson, Nance; Dasho, Stefan; Martin, Anna C.; Wallerstein, Nina; Wang, Caroline C.; Minkler, Meredith

    2007-01-01

    The Youth Empowerment Strategies (YES!) project is an afterschool empowerment program and research project for underserved early adolescents. Central to YES! is an empowerment intervention that provides early adolescents with opportunities for civic engagement with other youth around issues of shared concern in their schools and neighborhoods.…

  6. Grand Junction Projects Office Remedial Action Project: Feasibility test of real-time radiation monitoring during removal of surface contamination from concrete floors

    SciTech Connect

    Leino, R.; Corle, S.

    1995-10-01

    This feasibility test was conducted to determine if real-time radiation-monitoring instruments could be mounted on decontamination machines during remediation activities to provide useful and immediate feedback to equipment operators. The U.S. Department of Energy (DOE) sponsored this field test under the Grand Junction Projects Office Remedial Action Project (GJPORAP) to identify a more efficient method to remove radiological contamination from concrete floor surfaces. This test demonstrated that project durations and costs may be reduced by combining radiation-monitoring equipment with decontamination machines. The test also demonstrated that a microprocessor-based instrument such as a radiation monitor can withstand the type of vibration that is characteristic of floor scabblers with no apparent damage. Combining radiation-monitoring equipment with a decontamination machine reduces the time and costs required to decontaminate concrete surfaces. These time and cost savings result from the reduction in the number of interim radiological surveys that must be conducted to complete remediation. Real-time radiation monitoring allows equipment operators to accurately monitor contamination during the decontamination process without support from radiological technicians, which also reduces the project duration and costs. The DOE Grand Junction Projects Office recommends more extensive and rigorous testing of this real-time radiation monitoring to include a variety of surfaces and decontamination machines. As opportunities arise, additional testing will be conducted under GJPORAP.

  7. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    SciTech Connect

    Ewy, Ann; Hays, David

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  8. 75 FR 39561 - Administrative Guidelines; Subsidy Layering Reviews for Proposed Section 8 Project-Based Voucher...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND... assistance from other Federal, State, or local agencies (other Government Assistance). Section 2835 (a)(1)(F... may include State housing finance agencies, participating jurisdictions under the HOME program,...

  9. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    SciTech Connect

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  10. Seeking to Improve African American Girls' Attitudes toward Science: A Participatory Action Research Project

    ERIC Educational Resources Information Center

    Buck, Gayle A.; Cook, Kristin L.; Quigley, Cassie F.; Prince, Pearl; Lucas, Yvonne

    2014-01-01

    In this participatory action research study, we answered the question, How can we improve attitudes toward science education of the African American girls at an elementary school? Girls in grades 3-6 completed the Modified Attitudes toward Science Inventory. A purposeful sample of 30 girls participated in several focus-group interviews throughout…

  11. Evaluation of a Multi-Case Participatory Action Research Project: The Case of SOLINSA

    ERIC Educational Resources Information Center

    Home, Robert; Rump, Niels

    2015-01-01

    Purpose: Scholars agree that evaluation of participatory action research is inherently valuable; however there have been few attempts at evaluating across methods and across interventions because the perceived success of a method is affected by context, researcher skills and the aims of the participants. This paper describes the systematic…

  12. Invariants of projective actions and their application to recognition of fingerprints

    NASA Astrophysics Data System (ADS)

    Konovenko, Nadiia; Lychagin, Valentin

    2016-03-01

    We study the field of rational differential invariants of the left {PSL}2( {R}) -action on the homogeneous space { Diff(S}1)/{PSL}2( {R}) and use them to give an alternative discription of the shape space and fingerprints, introduced by Mumford and Sharon (Int J Comput Vis 70(1):55-75, 2006).

  13. The Northern New England Social Action Theater. Literacy Theater Staff Training Project: An Evaluation. Evaluation Report.

    ERIC Educational Resources Information Center

    Mackin, Kathleen J.; And Others

    A study examined the effectiveness and replicability of staff training programs provided by the Northern New England Social Action Theater (NNESAT), whose touring component travels around the country promoting the use of improvisational theater as a means of training all levels of literacy practitioners. Questionnaires were administered at 13…

  14. Lessons from the Field: Participatory Action Research in a Family Research Project.

    ERIC Educational Resources Information Center

    Robison, Dorothy; Krauss, Marty Wyngaarden

    2003-01-01

    This paper describes development of a study that includes participatory action research, specifically the establishment of a family advisory committee. The study involved a survey of Massachusetts families of children with disabilities. Suggestions for establishing and integrating the committee into the research enterprise are offered, as are…

  15. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    SciTech Connect

    Bachrach, A.; Hoopes, J.; Morycz, D. ); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. , Inc., Washington, DC ); Rice, G. )

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

  16. In Our Hands: A Multi-Site Parent-Teacher Action Research Project. Report No. 30.

    ERIC Educational Resources Information Center

    Palanki, Ameetha; Burch, Patricia

    This report describes the efforts of eight elementary and middle schools in seven states to involve families and communities in ways that have significant impact on students' learning. Through a process called Parent-Teacher Action Research (PTAR), teams of parents and teachers, principals, and facilitators at each school closely examined their…

  17. Effects of a Long-Term Participatory Action Research Project on Science Teachers' Professional Development

    ERIC Educational Resources Information Center

    Eilks, Ingo; Markic, Silvija

    2011-01-01

    This paper describes the potential of long-term co-operation between science educators and science teachers concerning the teachers' continuous professional development, based on Participatory Action Research in science education. The discussion is based on a six-year case study observing a group of about ten German chemistry teachers by chemistry…

  18. The development of peer reflective supervision amongst nurse educator colleagues: An action research project.

    PubMed

    Bulman, C; Forde-Johnson, C; Griffiths, A; Hallworth, S; Kerry, A; Khan, S; Mills, K; Sharp, P

    2016-10-01

    This action research study developed the use of peer reflective supervision (PRS) amongst eight nurse educators contributing to an undergraduate Adult Nursing programme at a UK University. During the academic year (2013-14), nurse educator co-researchers met for an introductory workshop and then met regularly in pairs to facilitate each other's reflection. This provided an opportunity for nurse educators to reflect on identified issues linked to their role with a facilitative peer. Educators met three additional times in a Reflexive Learning Group (RLG), to gather data on their use of PRS. Audio-recordings from the RLGs were transcribed and analysed using Norton's (2009) thematic analysis framework. Co-researchers iteratively validated the data and an external validation group critically viewed the evidence. Overall, seven themes were generated from the three research cycles. These were: PRS as a Valuable Affirming Experience; Time Issues; Facilitation- Support, Trust and Challenge; Developing a Flexible 'Toolbox'; To Write or Not to Write; Drawing on Literature; and Requirement for Action. Findings add new evidence regarding use of a flexible toolbox of resources to develop reflection and offer practical guidance on the development of PRS. Nurse educators often experienced similar concerns, and a facilitative supervision structure allowed co-researchers to positively explore these. Recognition of work pressures and requirement for time and space for reflection was highlighted, particularly regarding writing, and exploring the literature, to develop critical analysis of experiences. The importance of action as part of the reflective process was emphasised. Co-researchers reported positive personal change as well as the opportunity to highlight issues through their reflection for further action within the organisation. The study adds constructive evidence for the use of reflection to explore professional work, make sense of experiences and develop positive action

  19. The development of peer reflective supervision amongst nurse educator colleagues: An action research project.

    PubMed

    Bulman, C; Forde-Johnson, C; Griffiths, A; Hallworth, S; Kerry, A; Khan, S; Mills, K; Sharp, P

    2016-10-01

    This action research study developed the use of peer reflective supervision (PRS) amongst eight nurse educators contributing to an undergraduate Adult Nursing programme at a UK University. During the academic year (2013-14), nurse educator co-researchers met for an introductory workshop and then met regularly in pairs to facilitate each other's reflection. This provided an opportunity for nurse educators to reflect on identified issues linked to their role with a facilitative peer. Educators met three additional times in a Reflexive Learning Group (RLG), to gather data on their use of PRS. Audio-recordings from the RLGs were transcribed and analysed using Norton's (2009) thematic analysis framework. Co-researchers iteratively validated the data and an external validation group critically viewed the evidence. Overall, seven themes were generated from the three research cycles. These were: PRS as a Valuable Affirming Experience; Time Issues; Facilitation- Support, Trust and Challenge; Developing a Flexible 'Toolbox'; To Write or Not to Write; Drawing on Literature; and Requirement for Action. Findings add new evidence regarding use of a flexible toolbox of resources to develop reflection and offer practical guidance on the development of PRS. Nurse educators often experienced similar concerns, and a facilitative supervision structure allowed co-researchers to positively explore these. Recognition of work pressures and requirement for time and space for reflection was highlighted, particularly regarding writing, and exploring the literature, to develop critical analysis of experiences. The importance of action as part of the reflective process was emphasised. Co-researchers reported positive personal change as well as the opportunity to highlight issues through their reflection for further action within the organisation. The study adds constructive evidence for the use of reflection to explore professional work, make sense of experiences and develop positive action

  20. Theory and action for health promotion illustrations from the North Karelia Project.

    PubMed Central

    McAlister, A; Puska, P; Salonen, J T; Tuomilehto, J; Koskela, K

    1982-01-01

    The North Karelia Project in Finland illustrates the fundamental goals of health promotion. Specific activities of the project serve as examples of how concepts from the social and behavioral sciences can be applied to achieve estimated reductions in predicted risk of disease. The results in North Karelia are not conclusive, but they are encouraging, and the investigations conducted there is an essential reference for future research in health promotion and disease prevention. PMID:7053618

  1. The ultrasonic ranging and data system for radiological surveys in the UMTRA (Uranium Mill Tailings Remedial Action) Project

    SciTech Connect

    Little, C.A.; Berven, B.A.; Blair, M.S.; Dickerson, K.S.; Pickering, D.A.

    1988-01-01

    The Ultrasonic Ranging and Data System (USRADS) was developed to allow radiation exposure data and positional information to be collected, stored and analyzed in a more efficient manner than currently employed on the (Uranium Mill Tailings Remedial Action (UMTRA) project. USRADS is a portable unit which employs ultrasonics, radio frequency transmissions, and a personal computer. Operational experience indicates that the system results in increased information about the property with decreased data analysis and transcription effort and only slightly more field effort. 5 refs., 3 figs., 2 tabs.

  2. 42 CFR 137.376 - Are design and construction projects performed by Self-Governance Tribes under section 509 of the...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Are design and construction projects performed by... design and construction projects performed by Self-Governance Tribes under section 509 of the Act subject... negotiate the use of Federal metric requirements in the construction project agreement when the...

  3. 42 CFR 137.376 - Are design and construction projects performed by Self-Governance Tribes under section 509 of the...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Are design and construction projects performed by... design and construction projects performed by Self-Governance Tribes under section 509 of the Act subject... negotiate the use of Federal metric requirements in the construction project agreement when the...

  4. 42 CFR 137.376 - Are design and construction projects performed by Self-Governance Tribes under section 509 of the...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Are design and construction projects performed by... design and construction projects performed by Self-Governance Tribes under section 509 of the Act subject... negotiate the use of Federal metric requirements in the construction project agreement when the...

  5. 42 CFR 137.376 - Are design and construction projects performed by Self-Governance Tribes under section 509 of the...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Are design and construction projects performed by... design and construction projects performed by Self-Governance Tribes under section 509 of the Act subject... negotiate the use of Federal metric requirements in the construction project agreement when the...

  6. 42 CFR 137.376 - Are design and construction projects performed by Self-Governance Tribes under section 509 of the...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Are design and construction projects performed by... design and construction projects performed by Self-Governance Tribes under section 509 of the Act subject... negotiate the use of Federal metric requirements in the construction project agreement when the...

  7. Projecting the self into the future in individuals with schizophrenia: a preliminary cross-sectional study.

    PubMed

    Raffard, Stéphane; Bortolon, Catherine; D'Argembeau, Arnaud; Gardes, Jeanne; Gely-Nargeot, Marie-Christine; Capdevielle, Delphine; Van der Linden, Martial

    2016-07-01

    The ability to project oneself into the future contributes to development and maintenance of a coherent sense of identity. If recent research has revealed that schizophrenia is associated with difficulties envisioning the future, little is known about patients' future self-representations. In this study, 27 participants with schizophrenia and 26 healthy controls were asked to simulate mental representations of plausible and highly significant future events (self-defining future projections, SDFPs) that they anticipate to happen in their personal future. Main results showed that schizophrenia patients had difficulties in reflecting on the broader meaning and implications of imagined future events. In addition, and contrary to our hypothesis, a large majority of SDFPs in schizophrenia patients were positive events, including achievements, relationship, and leisure contents. Interestingly, patients and controls did not differ on the perceived probability that these events will occur in the future. Our results suggest that schizophrenia patients have an exaggerated positive perception of their future selves. Together, these findings lend support to the idea that past and future self-defining representations have both similar and distinct characteristics in schizophrenia.

  8. A VAX/VMS mapped section/virtual memory utility package: Yucca Mountain Project

    SciTech Connect

    Yarrington, L.

    1990-02-01

    A VAX/VMS Mapped Section/Virtual Memory Utility Package is a collection of FORTRAN subprograms that allocate virtual memory and, optionally, map that memory to a file. The subprograms use VMS system services and run-time libraries for allocating and mapping memory; therefore, the utility package is system dependent and functional on that platform only. FORTRAN-77 is one of the most widely used languages for computer programming. Languages have been developed in the past few decades that provide more powerful tools than FORTRAN and overcome some of its limitations. Two limitations addressed by this paper which have been a source of frustration to many programmers are that (1) FORTRAN does not provide dynamic array allocation and (2) FORTRAN file input-output is very slow. The solutions presented here are for the VAX/VMS operating system and use system services that are not part of the standard FORTRAN language description. Also discussed in this paper are dynamic array allocation, mapped sections of the program memory, and support modules. 3 refs.

  9. Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

    SciTech Connect

    Bolinger, Mark; Wiser, Ryan; Darghouth, Naim

    2010-05-05

    This article evaluates the first year of the Section 1603 Treasury cash grant program, which enables renewable power projects in the U.S. to elect cash grants in lieu of the federal tax credits that are otherwise available. To date, the program has been heavily subscribed, particularly by wind power projects, which had received 86% of the nearly $2.6 billion in grants that had been disbursed as of March 1, 2010. As of that date, 6.2 GW of the 10 GW of new wind capacity installed in the U.S. in 2009 had applied for grants in lieu of production tax credits. Roughly 2.4 GW of this wind capacity may not have otherwise been built in 2009 absent the grant program; this 2.4 GW may have supported approximately 51,600 short-term full-time-equivalent (FTE) gross job-years in the U.S. during the construction phase of these wind projects, and 3,860 longterm FTE gross jobs during the operational phase. The program’s popularity stems from the significant economic value that it provides to renewable power projects, relative to the otherwise available tax credits. Although grants reward investment rather than efficient performance, this evaluation finds no evidence at this time of either widespread “gold-plating” or performance problems.

  10. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    PubMed

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them. PMID:24722740

  11. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    PubMed

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them.

  12. Commissioning the NIFFTE Time Projection Chamber: Towards the 238U / 235U (n, f) Cross-section Ratio

    NASA Astrophysics Data System (ADS)

    Meharchand, R.; Asner, D. M.; Baker, R. G.; Bundgaard, J.; Burgett, E.; Cunningham, M.; Deaven, J.; Duke, D. L.; Greife, U.; Grimes, S.; Heffner, M.; Hill, T.; Isenhower, D.; Klay, J. L.; Kleinrath, V.; Kornilov, N.; Laptev, A. B.; Loveland, W.; Massey, T. N.; Qu, H.; Ruz, J.; Sangiorgio, S.; Seilhan, B.; Snyder, L.; Stave, S.; Tatishvili, G.; Thornton, R. T.; Tovesson, F.; Towell, D.; Towell, R. S.; Watson, S.; Wendt, B.; Wood, L.

    2014-05-01

    The Neutron Induced Fission Fragment Tracking Experiment (NIFFTE) collaboration is developing a Time Projection Chamber (TPC) to measure neutron-induced fission cross sections with unprecedented accuracy. Modifying TPC technology for nuclear physics applications is a challenging endeavor, and frequent testing and evaluation is required to ensure that all components are behaving as expected. In-beam tests of the NIFFTE TPC at the Los Alamos Neutron Science Center (LAN-SCE) commenced in 2010. An overview of the NIFFTE TPC experiments performed at LANSCE will be presented, along with preliminary performance results.

  13. Particles in Action. Study Guide. Unit C2. ZIM-SCI, Zimbabwe Secondary School Science Project.

    ERIC Educational Resources Information Center

    Stocklmayer, Sue

    The Zimbabwe Secondary School Science Project (ZIM-SCI) developed student study guides, corresponding teaching guides, and science kits for a low-cost science course which could be taught during the first 2 years of secondary school without the aid of qualified teachers and conventional laboratories. This ZIM-SCI study guide is a four-part unit…

  14. A Collaborative Action Research Project in an Inclusive Setting: Assisting a Blind Student

    ERIC Educational Resources Information Center

    Argyropoulos, Vassilios; Stamouli, Marina

    2006-01-01

    There has been a lot of discussion about the context and the content of integration and inclusion in Greece for the students with visual impairments. These discussions have led to the formulation of models of inclusion such as the co-teaching scheme. This article presents a project focused on an educational setting within which a sixth-grader…

  15. A Collaborative Action Research Project on Assessment and the Implications for the Pre-Service Participant.

    ERIC Educational Resources Information Center

    Seda, Ileana; Mamana, Lisa A.

    A study focused on a university-school collaborative research project on language assessment in the classroom context and the benefits of preservice teacher participation. Personnel from the Pennsylvania State University (including 20 preservice teacher education students), intermediate unit (Pennsylvania's regional service centers), and four…

  16. The Facebook-in-Action: Challenging, Harnessing and Enhancing Students Class Assignments and Projects

    ERIC Educational Resources Information Center

    Saifudin, Adam Mohd; Yacob, Aizan; Saad, Rohaizah

    2016-01-01

    Issues of universities students harnessing and capitalizing the usage of Facebook for their own learning capabilities and effective thinking is always the focus of education scholars, in assessing the quality class assignments and projects produced by them. Therefore, Facebook is now becoming unbearable influence since the internet activation in…

  17. Opening the Doors of Your Community. Pennsylvania Youth in Action. Project 2--Member Guide.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., University Park. Dept. of Agricultural and Extension Education.

    This student workbook is for 12- to 14-year-olds participating in the Pennsylvania 4-H "Opening the Doors of Your Community" project which is designed to involve youth in improving the quality of community life, learning about the role and functions of local government, understanding public issues, becoming involved in the process of community…

  18. Participatory Action Research in Education: The National Latino/a Education Research Agenda Project.

    ERIC Educational Resources Information Center

    Pedraza, Pedro

    2002-01-01

    The National Latino/a Education Research Agenda Project, an initiative developed at the Centro de Estudios Puertorriquenos at Hunter College, aims to give voice, perspective, and a research knowledge base to such issues as school reform and to improve academic outcomes and the long term life chances of Latino students and their families and…

  19. Particles in Action. Teacher's Guide. Unit C2. ZIM-SCI, Zimbabwe Secondary School Science Project.

    ERIC Educational Resources Information Center

    Stocklmayer, Sue

    The Zimbabwe Secondary School Science Project (ZIM-SCI) developed student study guides, corresponding teaching guides, and science kits for a low-cost science course which could be taught during the first 2 years of secondary school without the aid of qualified teachers and conventional laboratories. This teaching guide, designed to be read in…

  20. 12 Years of Action Learning at EM Normandie: Monitored Field Projects as Regular Pedagogical Activities

    ERIC Educational Resources Information Center

    Anger, Sophie Gay; Hachard, Virginie

    2011-01-01

    The Master Grande Ecole curriculum at EM Normandie School is organized around junior consulting projects and real problem solving activities aiming at bridging the gap between classroom knowledge and professional competencies. Since the 90's, students are involved in regular consulting activities for local and national companies following the…

  1. Community Colleges and Regional Recovery: Strategies for State Action. Project on State and Metropolitan Innovation

    ERIC Educational Resources Information Center

    Kazis, Richard

    2011-01-01

    Employers need a pipeline of quality workers with different levels of skill and desired earnings. Almost half of U.S. jobs today can be defined as "middle skill" jobs, requiring less than a four-year degree but more than a high school diploma. The Bureau of Labor Statistics (BLS) occupational projections indicate that job categories for which the…

  2. Project Citizen: Promoting Action-Oriented Citizen Science in the Classroom

    ERIC Educational Resources Information Center

    Green, Carie; Medina-Jerez, William

    2012-01-01

    In recent years, citizen science projects have emerged as a means to involve students in scientific inquiry, particularly in the fields of ecology and environmental science. A citizen scientist is "a volunteer who collects and/or processes data as part of a scientific inquiry" (Silverton 2009, p. 467). Participation in citizen science fosters an…

  3. TQM in action ... the experience of a nursing documentation project team.

    PubMed

    Jackson, M B

    1995-01-01

    This is the second article in a two-part series that describes the implementation of TQM at the Jewish Home of Rochester, New York, a 362 bed long term care facility. The first article gave an overview of the implementation process in the organization. This article describes the work of one of the initial project teams.

  4. 2014 Well Completion Report for Corrective Action Unit 447 Project Shoal Area Churchill County, Nevada October 2015

    SciTech Connect

    Findlay, Rick

    2015-11-01

    This report summarizes the drilling program conducted by the U.S. Department of Energy (DOE) Office of Legacy Management at the Project Shoal Area (Shoal) Subsurface Corrective Action Unit 447 in Churchill County, Nevada. Shoal was the location of an underground nuclear test conducted on October 26, 1963, as part of the Vela Uniform program sponsored jointly by the U.S. Department of Defense and the U.S. Atomic Energy Commission (a predecessor to DOE). The test consisted of detonating a 12-kiloton nuclear device in granitic rock at a depth of approximately 1,211 feet (ft) below ground surface (bgs) (AEC 1964). The corrective action strategy for the site is focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network at the site. Field activities associated with the project were conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended) and applicable Nevada Division of Environmental Protection (NDEP) policies and regulations.

  5. Neutron cross-sections for advanced nuclear systems: the n_TOF project at CERN

    NASA Astrophysics Data System (ADS)

    Barbagallo, M.; Mastromarco, M.; Colonna, N.; Altstadt, S.; Andrzejewski, J.; Audouin, L.; Bécares, V.; Bečvář, F.; Belloni, F.; Berthoumieux, E.; Billowes, J.; Bosnar, D.; Brugger, M.; Calviani, M.; Calviño, F.; Cano-Ott, D.; Carrapiço, C.; Cerutti, F.; Chiaveri, E.; Chin, M.; Cortés, G.; Cortés-Giraldo, M. A.; Diakaki, M.; Domingo-Pardo, C.; Duran, I.; Dressler, R.; Eleftheriadis, C.; Ferrari, A.; Fraval, K.; Ganesan, S.; García, A. R.; Giubrone, G.; Gonçalves, I. F.; González-Romero, E.; Griesmayer, E.; Guerrero, C.; Gunsing, F.; Hernández-Prieto, A.; Jenkins, D. G.; Jericha, E.; Kadi, Y.; Käppeler, F.; Karadimos, D.; Kivel, N.; Koehler, P.; Krtička, M.; Kroll, J.; Lampoudis, C.; Langer, C.; Leal-Cidoncha, E.; Lederer, C.; Leeb, H.; Leong, L. S.; Losito, R.; Manousos, A.; Marganiec, J.; Martínez, T.; Massimi, C.; Mastinu, P. F.; Mendoza, E.; Mengoni, A.; Milazzo, P. M.; Mingrone, F.; Mirea, M.; Mondalaers, W.; Paradela, C.; Pavlik, A.; Perkowski, J.; Plompen, A.; Praena, J.; Quesada, J. M.; Rauscher, T.; Reifarth, R.; Riego, A.; Rubbia, C.; Sabaté-Gilarte, M.; Sarmento, R.; Saxena, A.; Schillebeeckx, P.; Schmidt, S.; Schumann, D.; Tagliente, G.; Tain, J. L.; Tarrío, D.; Tassan-Got, L.; Tsinganis, A.; Valenta, S.; Vannini, G.; Variale, V.; Vaz, P.; Ventura, A.; Vermeulen, M. J.; Vlachoudis, V.; Vlastou, R.; Wallner, A.; Ware, T.; Weigand, M.; Weiß, C.; Wright, T.; Žugec, P.

    2014-12-01

    The study of neutron-induced reactions is of high relevance in a wide variety of fields, ranging from stellar nucleosynthesis and fundamental nuclear physics to applications of nuclear technology. In nuclear energy, high accuracy neutron data are needed for the development of Generation IV fast reactors and accelerator driven systems, these last aimed specifically at nuclear waste incineration, as well as for research on innovative fuel cycles. In this context, a high luminosity Neutron Time Of Flight facility, n_TOF, is operating at CERN since more than a decade, with the aim of providing new, high accuracy and high resolution neutron cross-sections. Thanks to the features of the neutron beam, a rich experimental program relevant to nuclear technology has been carried out so far. The program will be further expanded in the near future, thanks in particular to a new high-flux experimental area, now under construction.

  6. Nurses experience of aromatherapy use with dementia patients experiencing disturbed sleep patterns. An action research project.

    PubMed

    Johannessen, Berit

    2013-11-01

    The purpose of this study was to gain an insight into nurses' experiences of incorporating aromatherapy into the care of residents suffering from dementia, anxiety and disturbed sleep patterns. Twenty-four residents and twelve nurses from four nursing homes participated in an action research study. The use of lavender augustofolia essential oil diffused nightly was perceived as an effective care modality reducing insomnia and anxiety in this patient cohort. Nurses experienced some negative attitudes among colleagues because they considered aromatherapy as not evidence based. Nurses require greater access to evidence based use of Aromatherapy. Further research is needed to study how smell can enhance dementia care. PMID:24199975

  7. Nurses experience of aromatherapy use with dementia patients experiencing disturbed sleep patterns. An action research project.

    PubMed

    Johannessen, Berit

    2013-11-01

    The purpose of this study was to gain an insight into nurses' experiences of incorporating aromatherapy into the care of residents suffering from dementia, anxiety and disturbed sleep patterns. Twenty-four residents and twelve nurses from four nursing homes participated in an action research study. The use of lavender augustofolia essential oil diffused nightly was perceived as an effective care modality reducing insomnia and anxiety in this patient cohort. Nurses experienced some negative attitudes among colleagues because they considered aromatherapy as not evidence based. Nurses require greater access to evidence based use of Aromatherapy. Further research is needed to study how smell can enhance dementia care.

  8. Seeking to Bridge the Divide: Linking Formal and Non-Formal Education in Uttar-Pradesh, India. IBE Collaborative Projects: Strengthening Capacities through Action

    ERIC Educational Resources Information Center

    Zutshi, Bupinder

    2004-01-01

    The new monograph series, IBE Collaborative Projects: Strengthening Capacities through Action, documents projects initiated and managed by local or national level institutions in diverse countries, which have been technically or academically assisted by UNESCO's International Bureau of Education (IBE). This first publication in the series…

  9. Women Reaching Women: A Story of Change. The Role of Narrative in Building Trust and Commitment during an Action Research Project

    ERIC Educational Resources Information Center

    Langley, Dawn

    2012-01-01

    Women Reaching Women was a three-year action research project aimed at raising awareness of world poverty, gender inequality and climate change. The project brought together the National Federation of Women's Institutes, Oxfam, the Everyone Foundation and a unique group of 28 women drawn from Women's Institutes across the country. The project…

  10. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    .... Water Street Connector will be a new two-way roadway improving access between the waterfront and Route...: 1. General: National Environmental Policy Act (NEPA) [42 U.S.C. 4321-4351]. 2. Wetlands and Water Resources: Clean Water Act (Section 404) [33 U.S.C. 1251-1377]. Authority: 23 U.S.C. 139(l)(1). Issued...

  11. Teaching clinical reasoning by making thinking visible: an action research project with allied health clinical educators

    PubMed Central

    2014-01-01

    Background Clinical reasoning is fundamental to all forms of professional health practice, however it is also difficult to teach and learn because it is complex, tacit, and effectively invisible for students. In this paper we present an approach for teaching clinical reasoning based on making expert thinking visible and accessible to students. Methods Twenty-one experienced allied health clinical educators from three tertiary Australian hospitals attended up to seven action research discussion sessions, where they developed a tentative heuristic of their own clinical reasoning, trialled it with students, evaluated if it helped their students to reason clinically, and then refined it so the heuristic was targeted to developing each student’s reasoning skills. Data included participants’ written descriptions of the thinking routines they developed and trialed with their students and the transcribed action research discussion sessions. Content analysis was used to summarise this data and categorise themes about teaching and learning clinical reasoning. Results Two overriding themes emerged from participants’ reports about using the ‘making thinking visible approach’. The first was a specific focus by participating educators on students’ understanding of the reasoning process and the second was heightened awareness of personal teaching styles and approaches to teaching clinical reasoning. Conclusions We suggest that the making thinking visible approach has potential to assist educators to become more reflective about their clinical reasoning teaching and acts as a scaffold to assist them to articulate their own expert reasoning and for students to access and use. PMID:24479414

  12. Leading multi-professional teams in the children’s workforce: an action research project

    PubMed Central

    Stuart, Kaz

    2012-01-01

    Introduction The 2004 Children Act in the UK saw the introduction of integrated working in children’s services. A raft of change followed with processes designed to make joint working easier, and models and theories to support the development of integrated work. This paper explores the links between key concepts and practice. Methods A practitioner action research approach is taken using an autoethnographic account kept over six months. The research question was, to what extent is this group collaborating? Results When the architecture of practice was revealed, differences between espoused and real practice could be seen. Whilst understanding and displaying the outward signs of an effective multi professional group, the individuals did not trust one another. This was exhibited by covert interprofessional issues. As a result, collaborative inertia was achieved. This realisation prompted them to participate in further developmental and participative action research. Conclusion The paper concludes that trust and relational agency are central to effective leadership of multi professional teams. PMID:22371690

  13. Service user integration into social work education: lessons learned from nordic participatory action projects.

    PubMed

    Angelin, Anna

    2015-01-01

    Service users have lacked substantial influence, access, and participation in social work education in Norway and Sweden. In this article the author presents comparative analyses of two participatory projects that have developed and implemented practices that integrate service users into academic social work education and empower service users. The Norwegian HUSK project and the Social Work as Mobilization and Entrepreneurship course, also known as the "Mobilization course," at Lund University in Sweden demonstrate collaboration between research, social work education, and service users. The conclusions focus on the importance of the empowering processes by including recognition and dialogue, co-learning in practice, and the use of neutral venues to ensure effective user participation. The inclusion of service users in social work education can improve both practice and education. PMID:25662088

  14. The chromosome-centric human proteome project: a call to action.

    PubMed

    Hühmer, Andreas F R; Paulus, Aran; Martin, LeRoy B; Millis, Kevin; Agreste, Tasha; Saba, Julian; Lill, Jennie R; Fischer, Steven M; Dracup, William; Lavery, Paddy

    2013-01-01

    The grand vision of the human proteome project (HPP) is moving closer to reality with the recent announcement by HUPO of the creation of the HPP consortium in charge of the development of a two-part HPP, one focused on the description of proteomes of biological samples or related to diseases (B/D-HPP) and the other dedicated to a systematic description of proteins as gene products encoded in the human genome (the C-HPP). This new initiative of HUPO seeks to identify and characterize at least one representative protein from every gene, create a protein distribution atlas and a protein pathway or network map. This vision for proteomics can be the roadmap of biological and clinical research for years to come if it delivers on its promises. The Industrial Advisory Board (IAB) to HUPO shares the visions of C-HPP. The IAB will support and critically accompany the overall project goals and the definitions of the critical milestones. The member companies are in a unique position to develop hardware and software, reagents and standards, procedures, and workflows to ensure a reliable source of tools available to the proteomics community worldwide. In collaboration with academia, the IAB member companies can and must develop the tools to reach the ambitious project goals. We offer to partner with and challenge the academic groups leading the C-HPP to define both ambitious and obtainable goals and milestones to make the C-HPP a real and trusted resource for future biology.

  15. Quarry Haul Road Ecological Survey. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri: Revision 1

    SciTech Connect

    Not Available

    1992-09-01

    This biological survey was performed to document the summer flora and fauna found along the haul road constructed as part of the remedial action for the quarry bulk waste. State and Federal species listed as threatened or endangered were noted if encountered while surveying. Sampling locations were equally spaced along the quarry haul road, and a survey for vegetation and birds conducted at each location. Bird observations were conducted as breeding bird surveys once in June of 1991, and again in June of 1992. Each year`s survey includes two observations in the early morning and one late in the evening. Vegetation surveys were conducted in 1991 using quadrants and transects. mammal, reptile, and amphibian sightings were noted as encountered.

  16. Tele-autonomous systems: New methods for projecting and coordinating intelligent action at a distance

    NASA Technical Reports Server (NTRS)

    Conway, Lynn; Volz, Richard; Walker, Michael W.

    1989-01-01

    There is a growing need for humans to perform complex remote operations and to extend the intelligence and experience of experts to distant applications. It is asserted that a blending of human intelligence, modern information technology, remote control, and intelligent autonomous systems is required, and have coined the term tele-autonomous technology, or tele-automation, for methods producing intelligent action at a distance. Tele-automation goes beyond autonomous control by blending in human intelligence. It goes beyond tele-operation by incorporating as much autonomy as possible and/or reasonable. A new approach is discussed for solving one of the fundamental problems facing tele-autonomous systems: The need to overcome time delays due to telemetry and signal propagation. New concepts are introduced called time and position clutches, that allow the time and position frames between the local user control and the remote device being controlled, to be desynchronized respectively. The design and implementation of these mechanisms are described in detail. It is demonstrated that these mechanisms lead to substantial telemanipulation performance improvements, including the result of improvements even in the absence of time delays. The new controls also yield a simple protocol for control handoffs of manipulation tasks between local operators and remote systems.

  17. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project - status to date January 1998

    SciTech Connect

    1998-04-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fifth year (1997) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). Staffing issues this year have been a challenge with the resignation of an Environmental Specialist (ES) in June 1997, and the death of Robert Stovall, an Environmental Engineer (EE) II in August 1997. Progress made during this period includes securing a contract laboratory, participation in several workgroup meetings for activities at the site, oversight of the Feasibility Study/Proposed Plan (FS/PP), coordination between the US Department of Energy and the various State regulatory programs and interactions with the local public drinking water supply agency and health departments.

  18. Does Education Plus Action Lead to Leadership on Climate? Preliminary Results from the ACE Leadership Development Longitudinal Survey Project

    NASA Astrophysics Data System (ADS)

    Anderson, R. K.; Qusba, L.; Lappe, M.; Flora, J. A.

    2014-12-01

    Through education and leadership development, Alliance for Climate Education (ACE) is building a generation of confident and capable youth driving climate solutions now throughout their lives. In 2011-12, a random sample of 2,800 high school students across the country was surveyed before and after seeing the ACE Assembly on climate science and solutions. The survey showed that the ACE Assembly resulted in a 27% increase in climate science knowledge scores, with 59% of students increasing their intentions to take action on climate and a doubling of the number of students talking to parents and peers about climate change. Students were also compared to the Global Warming's Six Americas classification of Americans' views on climate. Following the ACE Assembly, 60% of students were alarmed or concerned about climate change. Building off these results, in 2014 ACE began to assess the results of its leadership development program that follows the ACE Assembly. The goal of this survey project is to measure ACE's long-term impact on students' college and career pathways, civic engagement and climate action. Preliminary results show that a majority of students in ACE's leadership development program are alarmed about global warming and are having conversations about global warming. A majority of these students also feel confident in their ability to lead a climate-related campaign in their school and community. These students will continue to be surveyed through 2015.

  19. Groundwater Model Validation for the Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2008-05-19

    Stoller has examined newly collected water level data in multiple wells at the Shoal site. On the basis of these data and information presented in the report, we are currently unable to confirm that the model is successfully validated. Most of our concerns regarding the model stem from two findings: (1) measured water level data do not provide clear evidence of a prevailing lateral flow direction; and (2) the groundwater flow system has been and continues to be in a transient state, which contrasts with assumed steady-state conditions in the model. The results of DRI's model validation efforts and observations made regarding water level behavior are discussed in the following sections. A summary of our conclusions and recommendations for a path forward are also provided in this letter report.

  20. Scientific support by the BONUS+ projects for the sustainability of the Baltic Sea Region: the case of the HELCOM Baltic Sea Action Plan.

    PubMed

    Kononen, Kaisa; Andrusaitis, Andris; Sirola, Maija

    2014-02-01

    The synthesis of the BONUS+ research is introduced. The HELCOM Baltic Sea Action Plan is examined as a case to illustrate the potentials and challenges in building the science-policy making interface on a macro regional level. The projects address environmental challenges in the Baltic Sea as defined by the Baltic Sea Action Plan, or consider the environmental governance and decision making within the Baltic Sea context in general. Eutrophication, biodiversity, hazardous substances, maritime activities, and the environment governance are addressed, as are cross cutting issues, such as the impact of climate change, maritime spatial planning and impacts of future development on ecosystem services. The projects contributed to relevant policy developments: 37 consultations carried out at EU level, 49 modifications to policy documents and action plans, 153 suggestions for the efficacy of pertinent public policies and governance, and in 570 occasions, scientists working in BONUS+ projects served as members or observers in scientific and stakeholder committees.

  1. An assessment of plant biointrusion at the Uranium Mill Tailings Remedial Action Project rock-covered disposal cells

    SciTech Connect

    Not Available

    1990-10-01

    This study is one of a number of special studies that have been conducted regarding various aspects of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This special study was proposed following routine surveillance and maintenance surveys and observations reported in a special study of vegetative covers (DOE, 1988), in which plants were observed growing up through the rock erosion layer at recently completed disposal cells. Some of the plants observed were deep-rooted woody species, and questions concerning root intrusion into disposal cells and the need to control plant growth were raised. The special study discussed in this report was designed to address some of the ramifications of plant growth on disposal cells that have rock covers. The NRC has chosen rock covers over vegetative covers in the arid western United States because licenses cannot substantiate that the vegetative covers will be significantly greater than 30 percent and preferably 70 percent,'' which is the amount of vegetation required to reduce flow to a point of stability.'' The potential impacts of vegetation growing in rock covers are not addressed by the NRC (1990). The objectives, then, of this study were to determine the species of plants growing on two rock-covered disposal cells, study the rooting pattern of plants on these cells, and identify possible impacts of plant root penetration on these and other UMTRA Project rock-covered cells.

  2. The EURONIC Project: a European concerted action on information to parents and ethical decision-making in neonatal intensive care.

    PubMed

    Cuttini, M; Kaminski, M; Saracci, R; de Vonderweid, U

    1997-10-01

    The paper presents the background, objectives and methods of a European concerted action project aimed at exploring the transmission of information to parents and the ethical decision-making process in neonatal intensive care from the perspective of health personnel, and in relation to the legal, cultural, social and ethical backgrounds of the various European countries. Eight countries are taking part in the project (France, Germany, Italy, Luxembourg, Spain, Sweden, The Netherlands and the United Kingdom), which is about to be extended also to Central and Eastern Europe (Estonia, Lithuania and Hungary). In each of them, the medical and nursing personnel of a number of randomly selected units will be interviewed through an anonymous, self-administered questionnaire. Information on the organisation and policies of the Units and on the national legislation will also be collected. The key features of the study lie in the multidisciplinary and international approach, the random selection of the sample as a guarantee of representativeness and lack of selection bias, the focus on the staff practices as well as on their attitudes and opinions.

  3. 34 CFR 222.141 - For what types of projects may the Secretary provide assistance under section 8008 of the Act?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false For what types of projects may the Secretary provide assistance under section 8008 of the Act? 222.141 Section 222.141 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND SECONDARY EDUCATION, DEPARTMENT OF EDUCATION IMPACT...

  4. Measuring Muon-Neutrino Charged-Current Differential Cross Sections with a Liquid Argon Time Projection Chamber

    SciTech Connect

    Spitz, Joshua B.

    2011-01-01

    More than 80 years after its proposed existence, the neutrino remains largely mysterious and elusive. Precision measurements of the neutrino's properties are just now beginning to take place. Such measurements are required in order to determine the mass of the neutrino, how many neutrinos there are, if neutrinos are different than anti-neutrinos, and more. Muon-neutrino charged-current differential cross sections on an argon target in terms of the outgoing muon momentum and angle are presented. The measurements have been taken with the ArgoNeuT Liquid Argon Time Projection Chamber (LArTPC) experiment. ArgoNeuT is the first LArTPC to ever take data in a low energy neutrino beam, having collected thousands of neutrino and anti-neutrino events in the NuMI beamline at Fermilab. The results are relevant for long baseline neutrino oscillation experiments searching for non-zero $\\theta_{13}$, CP-violation in the lepton sector, and the sign of the neutrino mass hierarchy, among other things. Furthermore, the differential cross sections are important for understanding the nature of the neutrino-nucleus interaction in general. These measurements represent a significant step forward for LArTPC technology as they are among the first neutrino physics results with such a device.

  5. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    SciTech Connect

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  6. Quality assurance project plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    This quality assurance project plan defines project organization and roles of responsibility, sampling and field procedures, sample documentation and chain-of-custody protocols, equipment calibration, analytical procedures, data reduction and validation, and internal quality control procedures for the former YS-860 Firing Ranges removal action at the Oak Ridge Y-12 Plant. The ENTECH Team will maintain the highest standards to ensure strict compliance with this plan. Implementation of this plan will include consideration of the technical, as well as administrative, aspects of activities affecting quality. Plan implementation is based on the premise that quality controls selected for each element of work are consistent with the risk, importance, and health and safety considerations of performing the work. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of two small arms firing ranges. This plan covers the removal action at the former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification sampling, grading, and revegetation.

  7. Possible sources and sites of action of the nitric oxide involved in synaptic plasticity at spinal lamina I projection neurons.

    PubMed

    Ruscheweyh, R; Goralczyk, A; Wunderbaldinger, G; Schober, A; Sandkühler, J

    2006-08-25

    The synaptic long-term potentiation between primary afferent C-fibers and spinal lamina I projection neurons is a cellular model for hyperalgesia [Ikeda H, Heinke B, Ruscheweyh R, Sandkühler J (2003) Synaptic plasticity in spinal lamina I projection neurons that mediate hyperalgesia. Science 299:1237-1240]. In lamina I neurons with a projection to the periaqueductal gray, this long-term potentiation is dependent on nitric oxide. In the present study, we used immunohistochemistry to detect possible sources and sites of action of the nitric oxide necessary for the long-term potentiation at lamina I spino-periaqueductal gray neurons in rats. None of the three isoforms of the nitric oxide synthase was expressed in a significant number of lamina I spino-periaqueductal gray neurons or primary afferent C-fibers (as evaluated by staining of their cell bodies in the dorsal root ganglia). However, endothelial and inducible nitric oxide synthase were found throughout the spinal cord vasculature and neuronal nitric oxide synthase was present in a number of neurons in laminae II and III. The nitric oxide target soluble guanylyl cyclase was detected in most lamina I spino-periaqueductal gray neurons and in approximately 12% of the dorsal root ganglion neurons, all of them nociceptive as evaluated by coexpression of substance P. Synthesis of cyclic 3',5'-guanosine monophosphate upon stimulation by a nitric oxide donor confirmed the presence of active guanylyl cyclase in at least a portion of the spino-periaqueductal gray neuronal cell bodies. We therefore propose that nitric oxide generated in neighboring neurons or blood vessels acts on the spino-periaqueductal gray neuron and/or the primary afferent C-fiber to enable long-term potentiation. Lamina I spino-parabrachial neurons were stained for comparison and yielded similar results.

  8. Environmental analysis and data report prepared for the environmental assessment of remedial action at the inactive uranium mill tailings site near Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-12-01

    This document contains information and data gathered in support of the preparation of the environmental assessment (EA) of the proposed remedial action at the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas. The Falls City EA was prepared pursuant to the National Environmental Policy Act (NEPA), which requires Federal agencies to assess the impacts of their actions on the environment. It examines the short- and long-term effects of the US Department of Energy's (DOE) remedial action for the Falls City site as well as the no action alternative. The DOE will use the information and analyses presented in the EA to determine whether the proposed action would have a significant impact on the environment. If the impacts are determined to be significant, an environmental impact statement (EIS) will be prepared. If the impacts are not determined to be significant, the DOE may issue a Finding of No Significant Impact (FONSI) and implement the proposed action. The information and data presented in this report are for background purposes only and are not required as part of the NEPA decision-making process.

  9. Projecting future wave climates and corresponding shoreline changes along the differently exposed coastal sections of the Baltic Sea

    NASA Astrophysics Data System (ADS)

    Suursaar, Ülo; Tõnisson, Hannes

    2015-04-01

    The aim of the study is to analyze the recently observed and projected future coastal changes in differently exposed Estonian coastal sections as a result of changing wind and wave climates. Along the shoreline of the practically tideless Baltic Sea, the increase in storminess has already impacted the coastal environment over the last 50 years. However, the number of storms, as well as their pathways, has been fluctuating considerably over the last decades. Furthermore, forecasting future hydrodynamic conditions and corresponding coastal changes is a rather mixed, yet crucial task. A number of Estonian study sites have been regularly examined by coastal scientists since the 1960s. Six coastal sections have been chosen for this study: Harilaid Peninsula (exposed to SW), Letipea-Sillamäe (N), Kõiguste-Nasva (SE), Kihnu-Pärnu (S), and two sides of the Osmussaar Island (W, N). Since the 2000s, use of GPS instruments and GIS software has enabled year-to-year changes in the shoreline to be tracked and the calculation of the corresponding areas or volumes due to accumulation and erosion. Recently digitized aerial photographs, as well as orthophotos and old topographic maps, enable the calculation of changes over longer sub-periods. Based on recorded and hindcasted changes in wind-driven hydrodynamic conditions, we found relationships between forcing conditions and the rates at which shorelines were changing. For future changes, wave climates were projected for the selected coastal sections of special geomorphic interest, where also a series of hydrodynamic surveys (waves, currents, sea level) were carried out using ADCP-s in 2006-2014. Wave parameters were consecutively hindcasted using a site-dependently calibrated fetch-based wave model. As the full calculation period (1966-2013) might suffer from inhomogeneity of wind input data, a confidently homogeneous time cut (2004-2013; 10 full years with hourly resolution) was chosen as a baseline (or control) period. An

  10. 75 FR 58380 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... clarifiers as part of a larger overall wastewater treatment plant upgrade project. This is a project specific... gates for two final clarifiers as part of a wastewater treatment plant upgrade project. Based on the... final clarifiers as part of a larger overall wastewater treatment plant upgrade project. The...

  11. Toward Improving Atmospheric Models and Ozone Projections: Laboratory UV Absorption Cross Sections and Equilibrium Constant of ClOOCl

    NASA Astrophysics Data System (ADS)

    Wilmouth, D. M.; Klobas, J. E.; Anderson, J. G.

    2015-12-01

    Thirty years have now passed since the discovery of the Antarctic ozone hole, and despite comprehensive international agreements being in place to phase out CFCs and halons, polar ozone losses generally remain severe. The relevant halogen compounds have very long atmospheric lifetimes, which ensures that seasonal polar ozone depletion will likely continue for decades to come. Changes in the climate system can further impact stratospheric ozone abundance through changes in the temperature and water vapor structure of the atmosphere and through the potential initiation of solar radiation management efforts. In many ways, the rate at which climate is changing must now be considered fast relative to the slow removal of halogens from the atmosphere. Photochemical models of Earth's atmosphere play a critical role in understanding and projecting ozone levels, but in order for these models to be accurate, they must be built on a foundation of accurate laboratory data. ClOOCl is the centerpiece of the catalytic cycle that accounts for more than 50% of the chlorine-catalyzed ozone loss in the Arctic and Antarctic stratosphere every spring, and so uncertainties in the ultraviolet cross sections of ClOOCl are particularly important. Additionally, the equilibrium constant of the dimerization reaction of ClO merits further study, as there are important discrepancies between in situ measurements and lab-based models, and the JPL-11 recommended equilibrium constant includes high error bars at atmospherically relevant temperatures (~75% at 200 K). Here we analyze available data for the ClOOCl ultraviolet cross sections and equilibrium constant and present new laboratory spectroscopic results.

  12. 26 CFR 301.7433-2 - Civil cause of action for violation of section 362 or 524 of the Bankruptcy Code.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of the willful actions of the officer or employee; and (ii) Costs of the action. (2) An action under... individual injured by a willful violation of the stay). However, any administrative or litigation costs in...) Litigation costs and administrative costs not recoverable as actual, direct economic damages....

  13. Scenarios in the Afya Project as a Participatory Action Research (PAR) Tool for Studying Information Seeking and Use across the "Digital Divide."

    ERIC Educational Resources Information Center

    Mehra, Bharat; Bishop, Ann Peterson; Bazzell, Imani; Smith, Cynthia

    2002-01-01

    Explores the role of scenarios (or use-oriented design representations) in the Afya project (which aims to improve health information and services for Black women) as a participatory action research (PAR) tool for studying information seeking and use across the "digital divide." (AEF)

  14. An Action Research Project: Development of a Pre-Licensure Examination Review Course for Emergency Medical Technician Program Graduates at a Rural Community College

    ERIC Educational Resources Information Center

    Boucher, Daryl

    2013-01-01

    This action research project examined how "Efficiency in Learning" ("EL") strategies, "Appreciative Inquiry" ("AI") and the "Interactive Model of Program Planning" ("IMPP") could be used to discern the content and preferred pedagogical approaches in the development of a pre-licensure…

  15. Improving Governance, Leadership, and Learning in New Jersey. State Action for Education Leadership Project (SAELP) Forum, January 28-29, 2003. Field Notes

    ERIC Educational Resources Information Center

    Bleistein, Stacey, Ed.

    2004-01-01

    New Jersey is one of fifteen states selected by the Wallace-Reader's Digest Fund to receive a planning and implementation grant for setting a reform agenda for a series of state policies that are designed to improve educational leadership and student learning. Under this grant, the State Action for Education Leadership Project (SAELP)…

  16. Making Meaning about Educational Experiences through Participatory Action Research: A Project Conducted with Adults Enrolled in a Community College Mathematics Course

    ERIC Educational Resources Information Center

    Moreno, German Alonso

    2015-01-01

    This paper discusses the findings of a group of co-researchers involved in a participatory action research (PAR) project conducted with adults in a developmental education program. The co-researchers were mostly individuals of Hispanic descent, who had struggled in the past with schooling. Because the educational experiences of Hispanics often…

  17. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  18. Using Nikola Tesla's Story and His Experiments as Presented in the Film "The Prestige" to Promote Scientific Inquiry: A Report of an Action Research Project

    ERIC Educational Resources Information Center

    Hadzigeorgiou, Yannis; Garganourakis, Vassilios

    2010-01-01

    This paper reports on an action research project undertaken with the primary aim of investigating the extent to which situations that evoke a sense of wonder can promote scientific inquiry. Given the intense interest, curiosity, and wonder that some students had begun to develop after seeing the film "The Prestige", a science teacher used this…

  19. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  20. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    SciTech Connect

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  1. Understanding the challenges of palliative care in everyday clinical practice: an example from a COPD action research project.

    PubMed

    Hynes, Geralyn; Kavanagh, Fiona; Hogan, Christine; Ryan, Kitty; Rogers, Linda; Brosnan, Jenny; Coghlan, David

    2015-09-01

    Palliative care seeks to improve the quality of life for patients suffering from the impact of life-limiting illnesses. Palliative care encompasses but is more than end-of-life care, which is defined as care during the final hours/days/weeks of life. Although palliative care policies increasingly require all healthcare professionals to have at least basic or non-specialist skills in palliative care, international evidence suggests there are difficulties in realising such policies. This study reports on an action research project aimed at developing respiratory nursing practice to address the palliative care needs of patients with advanced chronic obstructive pulmonary disease (COPD). The findings suggest that interlevel dynamics at individual, team, interdepartmental and organisational levels are an important factor in the capacity of respiratory nurses to embed non-specialist palliative care in their practice. At best, current efforts to embed palliative care in everyday practice may improve end-of-life care in the final hours/days/weeks of life. However, embedding palliative care in everyday practice requires a more fundamental shift in the organisation of care. PMID:25514830

  2. Assessment in Action: Collaborative Action Research Focused on Mathematics and Science Assessments. Reports of Twenty-Three Teacher-Research Projects.

    ERIC Educational Resources Information Center

    Dearn, Ceri; And Others

    The works reported in this book represent a second phase to a 2-day summer conference that focused on assessment in mathematics and science classrooms. This book presents research and findings of a subset of the conference participants who investigated a self-selected aspect of assessment in their educational environments. Action research was the…

  3. Ethical considerations related to participation and partnership: an investigation of stakeholders’ perceptions of an action-research project on user fee removal for the poorest in Burkina Faso

    PubMed Central

    2014-01-01

    Background Healthcare user fees present an important barrier for accessing services for the poorest (indigents) in Burkina Faso and selective removal of fees has been incorporated in national healthcare planning. However, establishing fair, effective and sustainable mechanisms for the removal of user fees presents important challenges. A participatory action-research project was conducted in Ouargaye, Burkina Faso, to test mechanisms for identifying those who are indigents, and funding and implementing user fee removal. In this paper, we explore stakeholder perceptions of ethical considerations relating to participation and partnership arising in the action-research. Methods We conducted 39 in-depth interviews to examine ethical issues associated with the action-research. Respondents included 14 individuals identified as indigent through the community selection process, seven members of village selection committees, six local healthcare professionals, five members of the management committees of local health clinics, five members of the research team, and four regional or national policy-makers. Using constant comparative techniques, we carried out an inductive thematic analysis of the collected data. Results The Ouargaye project involved a participatory model, included both implementation and research components, and focused on a vulnerable group within small, rural communities. Stakeholder perceptions and experiences relating to the participatory approach and reliance on multiple partnerships in the project were associated with a range of ethical considerations related to 1) seeking common ground through communication and collaboration, 2) community participation and risk of stigmatization, 3) impacts of local funding of the user fee removal, 4) efforts to promote fairness in the selection of the indigents, and 5) power relations and the development of partnerships. Conclusions This investigation of the Ouargaye project serves to illuminate the distinctive

  4. 75 FR 64308 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    ... Lowell, Massachusetts (``City'') for the purchase of a foreign manufactured heat recovery ventilator for... Station Improvements Project. This is a project specific waiver and only applies to the use of the... product must apply for a separate waiver based on project specific circumstances. Based upon...

  5. 76 FR 66064 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... manufactured 50 kW wind turbine generators that met project specifications were available. Accordingly, EPA will evaluate the request as a timely request. The Borough is completing a wind power project to supply power to its water treatment plant. The project is funded in part by the New Jersey Clean...

  6. 76 FR 26725 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... Wastewater Treatment Plant Upgrade project. This is a project specific waiver and only applies to the use of... of two specified aeration blower units as part of its Airport Parkway Wastewater Treatment Plant... Wastewater Treatment Facility Upgrade construction project is approximately two thirds completed. One of...

  7. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Chernoff, A.R. . Uranium Mill Tailings Remedial Action Project Office); Lacker, D.K. . Bureau of Radiation Control)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  8. Weldon Spring quarry construction staging area and water treatment plant site remedial action characterization report for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1991-09-01

    The quarry construction staging area (QCSA) and water treatment plant (WTP) are located in the areas that border the western edge of the Weldon Spring quarry (WSQ). These facilities were constructed to support bulk waste removal from the WSQ. This area was contaminated with U-238, Ra-226, and Th-230 and was remediated prior to construction in order to allow release of the area for use without radiological restrictions. This report documents the methods of characterization, the remediation activities, and the post remedial action sampling methods and analytical results. 4 refs., 6 figs., 4 tabs.

  9. Section 502(e) guidance providing credit toward energy efficiency goals for cost-effective projects where source energy use declines but site energy use increases

    SciTech Connect

    None, None

    2004-10-01

    Outlines how Section 502(e) of Executive Order 13123 requires the Secretary of Energy to “issue guidance for providing credit toward energy efficiency goals for cost-effective projects where source energy use declines but site energy use increases."

  10. 40 CFR 35.6700 - Project records.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Project records. 35.6700 Section 35... Actions Records Requirements Under A Cooperative Agreement § 35.6700 Project records. The lead agency for... assistance (whether lead or support agency) are responsible for maintaining project files described...

  11. 40 CFR 35.6700 - Project records.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Project records. 35.6700 Section 35... Actions Records Requirements Under A Cooperative Agreement § 35.6700 Project records. The lead agency for... assistance (whether lead or support agency) are responsible for maintaining project files described...

  12. 40 CFR 35.6700 - Project records.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Project records. 35.6700 Section 35... Actions Records Requirements Under A Cooperative Agreement § 35.6700 Project records. The lead agency for... assistance (whether lead or support agency) are responsible for maintaining project files described...

  13. 40 CFR 35.6700 - Project records.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Project records. 35.6700 Section 35... Actions Records Requirements Under A Cooperative Agreement § 35.6700 Project records. The lead agency for... assistance (whether lead or support agency) are responsible for maintaining project files described...

  14. 75 FR 75721 - Notice of Final Federal Agency Actions on Proposed Highway in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    .... The project also includes mitigation and restoration actions which are compatible with land use plans... Act, as amended . 3. Land: Section 4(f) of the Department of Transportation Act of 1966 ; Farmland... Water Resources: Clean Water Act (Section 404, Section 401, Section 319) ; Land and Water...

  15. 77 FR 55896 - Notice of Final Federal Agency Actions on Loop 1 in Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ..., Section 401, Section 319) ; Land and Water Conservation Fund (LWCF) ; Safe Drinking Water Act (SDWA) [42 U... Federal Highway Administration Notice of Final Federal Agency Actions on Loop 1 in Texas AGENCY: Federal..., Texas. Those actions grant licenses, permits, and approvals for the project. DATES: By this notice,...

  16. Action Research: Rethinking Lewin.

    ERIC Educational Resources Information Center

    Dickens, Linda; Watkins, Karen

    1999-01-01

    Explores both historical and contemporary definitions of action research. Describes the process and goals of action research in the tradition of Lewin. Presents a case study of an action-research project involving two teams in a high-technology corporation that depicts the process in action. (Author/CCM)

  17. 75 FR 58382 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... this project at the Lowell Water Treatment Plant. The imposition of ARRA Buy American requirements in... Lowell Water Treatment Facility. This is a project-specific waiver and only applies to the use of the... Lowell Water Treatment Facility. Based upon information submitted by the City's consulting engineer,...

  18. 76 FR 37350 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-27

    .../air conditioning systems (HVAC Systems) in Columbia, Missouri. This HVAC system consists of three (3... for the HVAC systems, a list of potential manufacturers and project schedule submitted by the City and... HVAC systems available to meet the City's project specifications. The Regional Administrator is...

  19. 76 FR 18757 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... unwilling to provide a 1.5 MW wind turbine generator on the basis that the project site did not meet the... research indicated that no other domestic manufactured 1.5 MW wind turbine generators met project specifications. Accordingly, EPA will evaluate the request as a timely request. The Authority's wind...

  20. Harmony in Career Learning and Scholastic System: Project Hi-Class 1988-89. OREA Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Hriskos, Constantine

    The report presents an evaluation of the New York City Harmony in Career Learning and Scholastic System (Project HI-CLASS) based on results from the 1988-89 school year. The project provided support services to 420 Spanish- and Chinese-speaking students of limited English proficiency (LEP). It also proposed to instill pride in and respect for…

  1. 76 FR 3136 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... Toshiba LQ500 density analyzers, to meet the City's design and performance specifications as part of its... improvement of thickener performance. Project specifications for a density analyzer require the following to... apply for a separate waiver based on project specific circumstances. Based upon critical...

  2. 76 FR 17857 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... will be submersed in the drinking water wet well, the project specification requires that all wetted.... Because the pump will be submerged in potable drinking water, the project specifications require the pump... such as stainless steel that would not leach hazardous materials into the drinking water....

  3. 23 CFR 140.605 - Approval actions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Approval actions. 140.605 Section 140.605 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT... Federal-aid projects. (b) Authorization of physical construction shall be given in the same manner as...

  4. 23 CFR 140.605 - Approval actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Approval actions. 140.605 Section 140.605 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT... Federal-aid projects. (b) Authorization of physical construction shall be given in the same manner as...

  5. 23 CFR 140.605 - Approval actions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Approval actions. 140.605 Section 140.605 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT... Federal-aid projects. (b) Authorization of physical construction shall be given in the same manner as...

  6. 23 CFR 140.605 - Approval actions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Approval actions. 140.605 Section 140.605 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT... Federal-aid projects. (b) Authorization of physical construction shall be given in the same manner as...

  7. 23 CFR 140.605 - Approval actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Approval actions. 140.605 Section 140.605 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT... Federal-aid projects. (b) Authorization of physical construction shall be given in the same manner as...

  8. 76 FR 38162 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... County) AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The EPA is hereby... Wayne County for the purchase of Link-Pipe PVC products in various pipe diameters for sewer pipe...

  9. 76 FR 18218 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... Reinvestment Act of 2009 (ARRA) to Salt Lake City, UT AGENCY: Environmental Protection Agency (EPA). ACTION... satisfactory quality to Salt Lake City, UT for three vertical linear motion mixers to be installed in the City... review and recommendation of EPA Region 8's Technical & Financial Services Unit. Salt Lake City...

  10. 76 FR 11193 - Notice of a Project Waiver of Section 1605 (Buy American Requirements) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-01

    ... Heating, Ventilation, Air Conditioning (HVAC) equipment for a hospital renovation and expansion project... County- proposed HVAC improvements were selected to address the unique conditions presented by the... that the HVAC equipment that will meet the County's design and performance specifications...

  11. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA (Environmental Protection Agency) standards (40 CFR Part 192)

    SciTech Connect

    Not Available

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs.

  12. Strategies of Action for Strengthening the Associated Schools Project in the Asia-Pacific Region. Final Report of a Regional Meeting to Formulate Strategies of Action for National Co-ordinators of Unesco Associated Schools Project (Bangkok, Thailand, December 16-22, 1986).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific and Cultural Organization, Bangkok (Thailand). Principal Regional Office for Asia and the Pacific.

    Results of a regional meeting to assess the current situation of the Associated Schools Project and to develop strategies of action at the national level are presented in this report. Twelve observers from China and Thailand and 16 representatives from 10 countries participated in the meeting. Participating countries included Australia,…

  13. 78 FR 26104 - Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... and Economic: Title VI of the Civil Rights Act of 1964 ; American Indian Religious Freedom Act...: Clean Air Act . 3. Land: Section 4(f) of the Department of Transportation Act of 1966 ; Section 6(f) of.... Wildlife: Section 7 of the Endangered Species Act [16 U.S.C. 1531-1544]; Fish and......

  14. Four-year longitudinal impact evaluation of the Action for Children UK Neglect Project: outcomes for the children, families, Action for Children, and the UK.

    PubMed

    Long, Tony; Murphy, Michael; Fallon, Debbie; Livesley, Joan; Devitt, Patric; McLoughlin, Moira; Cavanagh, Alison

    2014-08-01

    Neglect has a devastating impact on children and is the most pervasive form of child maltreatment in the United Kingdom. The study purpose was to establish outcomes for neglected children following structured assessment and intervention to ascertain what worked and why it worked. This prospective cohort study included 85 cases of neglected children under 8 years of age from 7 centers across the United Kingdom. Data were collected between 2008 and 2012 through serial quantitative recording of the level of concern about neglect. Serial review of qualitative case-file data was undertaken for detail of assessment, interventions, and evidence of outcomes for the child. Data analysis was undertaken by paired t-test, Chi Square, descriptive statics for categorical data, and, for narrative data, identification of recurring factors and patterns, with correlation of presenting factors, interventions, and outcomes. Paired t-test demonstrated significant decrease in overall Action for Children Assessment Tool scores between assessment (M=43.77, SD=11.09) and closing the case (M=35.47, SD=9.6, t(84)=6.77, p<0.01). Improvement in the level of concern about neglect was shown in 79% of cases, with only 21% showing no improvement. In 59% of cases, concern about neglect was removed completely. Use of the assessment tool fostered engagement by parents. The relationship between lack of parental engagement and children being taken into care was statistically significant, with a large effect size (χ(2) 10.66, df1, p=0.0001, OR=17.24). When parents refused or were unable to respond positively to the intervention, children benefited from an expedited move into care.

  15. Impact of Energy Policy Act of 2005 Section 206 Rebates on Consumers and Renewable Energy Consumption, With Projections to 2010

    EIA Publications

    2006-01-01

    The Energy Information Administration (EIA), with the agreement of the Department, interpreted section 206(d) as calling for a listing of the types of renewable fuels available today, and a listing of those that will be available in the future based on the incentives provided in section 206(d). This report provides that information, and also provides information concerning renewable energy equipment and renewable energy consumption.

  16. Environmental assessment of remedial action at the inactive uraniferous lignite processing sites at Belfield and Bowman, North Dakota. [UMTRA Project

    SciTech Connect

    Beranich, S.; Berger, N.; Bierley, D.; Bond, T.M.; Burt, C.; Caldwell, J.A.; Dery, V.A.; Dutcher, A.; Glover, W.A.; Heydenburg, R.J.; Larson, N.B.; Lindsey, G.; Longley, J.M.; Millard, J.B.; Miller, M.; Peel, R.C.; Persson-Reeves, C.H.; Titus, F.B.; Wagner, L.

    1989-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), to clean up the Belfield and Bowman, North Dakota, uraniferous lignite processing sites to reduce the potential health impacts associated with the residual radioactive materials remaining at these sites. Remedial action at these sites must be performed in accordance with the US Environmental Protection Agency's (EPA) standards promulgated for the remedial action and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of North Dakota. The inactive Belfield uraniferous lignite processing site is one mile southeast of Belfield, North Dakota. The inactive Bowman uraniferous lignite processing site at the former town of Griffin, is seven miles northwest of Bowman, North Dakota and 65 road miles south of Belfield. Lignite ash from the processing operations has contaminated the soils over the entire 10.7-acre designated Belfield site and the entire 12.1-acre designated Bowman site. Dispersion of the ash has contaminated an additional 20.6 acres surrounding the Belfield processing site and an additional 59.2 acres surrounding the Bowman processing site. The proposed remedial action is to relocate the contaminated materials at the Belfield processing site to the Bowman processing/disposal site for codisposal with the Bowman contaminated soils. The environmental impacts assessed in this EA were evaluated for the proposed remedial action and the no action alternative and demonstrate that the proposed action would not significantly affect the quality of the human environment and would be performed in compliance with applicable environmental laws. The no action alternative would not be consistent with the intent of Public Law 95-604 and would not comply with the EPA standards. 48 refs., 10 figs., 7 tabs.

  17. 24 CFR 5.655 - Section 8 project-based assistance programs: Owner preferences in selection for a project or unit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... in the Affirmative Fair Housing Marketing plan (in accordance with § 108.25 of this title) as a... jurisdiction in which the project is located; (C) Modification of the Affirmative Fair Housing Marketing Plan...) Tenant selection plan. The owner must adopt a written tenant selection plan in accordance with...

  18. 31 CFR 30.12 - Q-12: What actions are necessary for a TARP recipient to comply with section 111(d) of EESA (the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a TARP recipient to comply with section 111(d) of EESA (the excessive or luxury expenditures policy... recipient to comply with section 111(d) of EESA (the excessive or luxury expenditures policy requirement... recipient must adopt an excessive or luxury expenditures policy, provide this policy to Treasury and...

  19. 26 CFR 301.7433-2 - Civil cause of action for violation of section 362 or 524 of the Bankruptcy Code.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 362 or 524 of the Bankruptcy Code. 301.7433-2 Section 301.7433-2 Internal Revenue INTERNAL REVENUE... section 362 or 524 of the Bankruptcy Code. (a) In general. (1) If, in connection with the collection of a... may file a petition for damages against the United States in Federal bankruptcy court. The...

  20. 31 CFR 30.13 - Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on executive... for a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on executive... annual or other meeting of the shareholders of any TARP recipient that occurs during the TARP period...

  1. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.10 Q-10: What actions are necessary for a TARP... the compensation received (or that otherwise would have been received) during the period the employee... binding right to a bonus payment that is based upon services performed or compensation received during...

  2. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.10 Q-10: What actions are necessary for a TARP... the compensation received (or that otherwise would have been received) during the period the employee... binding right to a bonus payment that is based upon services performed or compensation received during...

  3. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.10 Q-10: What actions are necessary for a TARP... the compensation received (or that otherwise would have been received) during the period the employee... binding right to a bonus payment that is based upon services performed or compensation received during...

  4. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.10 Q-10: What actions are necessary for a TARP... right to a bonus payment, see 26 CFR 1.409A-1(b)(i). In addition, the bonus payment must be made...

  5. Mathematical Speech and Practical Action: A Case Study of the Challenges of Including Mathematics in a School Technology Project

    ERIC Educational Resources Information Center

    Bungum, Berit; Manshadi, Saeed; Lysne, Dag Atle

    2014-01-01

    This paper presents a case study of how a teacher and nine-year-old students deal with mathematics in a practical technology project. By analysing videotaped dialogues between teacher and a pair of students working on constructing a house model, we identify challenges of meaningful inclusion of mathematics in the project. The dialogues are…

  6. Employment Action Center's Demonstration Older Worker Project. Operated June 1, 1983 through November 31, 1983. Final Outcome Report.

    ERIC Educational Resources Information Center

    Henry, Ann; Teschendorf, JoAnn

    The Older Worker Project was conducted to provide employment services to unemployed persons aged 45 and older who live in the western part of the Hennepin County (Minneapolis, Minnesota) area. Although the expected result was permanent employment of the participants, the intention of this demonstration project was to refine service approaches…

  7. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada, Revision 0

    SciTech Connect

    Matthews, Patrick; Burmeister, Mark

    2014-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 square miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.

  8. 75 FR 67966 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... Engineers (ASCE) crane railing, which is part of the overhead bridge crane, proposed for the expansion of its existing Wastewater Treatment Plant (WWTP). The 40 lb/yd ASCE crane railing is manufactured by... 40 lb/yd ASCE crane railing not manufactured in America, for the proposed project being...

  9. 76 FR 32200 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-03

    ... hollow fiber ultrafiltration membrane cassettes, ZeeWeed 500D, which are the effluent filtration...) upgrade project. The ZeeWeed 500D immersed ultrafiltration membrane cassettes are manufactured outside of...Weed 500D immersed hollow fiber ultrafiltration membrane cassettes manufactured in Hungary by...

  10. 75 FR 5585 - Notice of a Regional Project Waiver of Section 1605 (Buy American Requirement) of the American...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... recover waste heat from the sludge incineration operation at the ACSD's North Plant wastewater treatment... adequate capacity to meet the electrical power output specifications for the proposed WWTP waste heat..., in Germany. This is a project specific waiver and only applies to the use of the identified...

  11. 76 FR 2683 - Notice of a Project Waiver of Section 1605: (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ...)/ARRA loan recipient, for the purchase of Air Release Vacuum (ARV) Valves manufactured by A.R.I. in... IEUA indicates that the design for the Church Street lateral project includes A.R.I. valves, which are... American requirements, to the IEUA for the acquisition of the ARV valves manufactured in Israel by...

  12. 75 FR 79374 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... submersible well pump as part of the construction of a new bedrock well field and raw water transmission line... manufactured submersible well pumps available to meet its proposed project specifications. The Regional... a 3 inch diameter submersible well pump by the District, as specified in its October 19,...

  13. 76 FR 80369 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... conditioning (HVAC) system, manufactured in Japan by Fujitsu General American, Inc. This is a project specific... HVAC system. Based upon information submitted by the County and its consulting engineer, EPA has concluded that there are no HVAC systems manufactured in the United States in sufficient and...

  14. 76 FR 30153 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... split HVAC systems: one air conditioning system and one combined heating/air conditioning system (HVAC), manufactured in Japan and Thailand by Mitsubishi Electronics American, Inc.--HVAC Division. This is a project... and Well House No. 2) with ductless split HVAC systems. The Well House No. 1 upgrade includes an...

  15. 75 FR 71127 - Notice of a Project Waiver of Section 1605 (Buy American Rquirement) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... Sec. 176.80(a)(1) states (at 77 FR 18452) that ``The determinations of nonavailability of the articles... produced in the United States of a satisfactory quality] to the UDWQ for the purchase of coconut fiber... product must apply for a separate waiver based on project-specific circumstances. These coconut...

  16. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ground waters of industrial wastewater having design capacity of less than 10,000 gallons per day in the... industrial wastewater; (9) Projects that substantially encroach upon the stream or upon the 100-year flood... day elsewhere in the Basin; except where such wastewater contains toxic concentrations of...

  17. 75 FR 25242 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ...-efficiency magnetic bearing turbo-compressors to be used in the city's sludge treatment process. This is a... waiver based on project-specific circumstances. These turbo-compressors, which are supplied by ABS USA of... high-speed, high-efficiency magnetic bearing turbo- compressors for Faribault's activated...

  18. 75 FR 25243 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ...-efficiency magnetic bearing turbo-compressors that will be used in the city's sludge treatment process. This... for a separate waiver based on project-specific circumstances. These turbo- compressors, which are... the purchase of high-speed, high-efficiency magnetic bearing turbo- compressors for Auburn's...

  19. 75 FR 6202 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... proposes to construct a ``Long Term Control Plan Store-Treat Facility Project'' at the Auburn Water... to Cedar Creek. After the rain event, the excess sewer flow will be treated at the Water Pollution... Reinvestment Act of 2009 (ARRA) to the Auburn, Indiana Department of Water Pollution Control (Auburn)...

  20. 75 FR 6389 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... presses. This is a project specific waiver and only applies to the use of the specified product for the... treatment facility improvements will include replacement of the existing belt filter press for sludge... that two 6-channel rotary press sludge dewatering units, manufactured by Fournier Industries of...

  1. The Effects of Content and Language Integrated Learning in European Education: Key Findings from the Andalusian Bilingual Sections Evaluation Project

    ERIC Educational Resources Information Center

    Lorenzo, Francisco; Casal, Sonia; Moore, Pat

    2010-01-01

    Content and Language Integrated Learning (CLIL) represents an increasingly popular pedagogic approach that has evolved in response to the recognised need for plurilingual competence in Europe. In this article, we present key findings from one of the first large-scale, multidimensional CLIL evaluation projects. We begin by outlining the emergence…

  2. 76 FR 31330 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... treatment process, which is designed to meet the high quality effluent requirements of the waste load allocation, under the NPDES permit. The Marathon Area 5 Waste Water Treatment Plant (WWTP) Upgrade Project is... is an advanced wastewater treatment process, which is designed to meet the high quality...

  3. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Classification of... less than a daily average rate of 100,000 gallons except when the imported water is wastewater; (18... water during any 30-day period; and (18) Any other project that the Executive Director may...

  4. 75 FR 8348 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ...) foreign manufactured wind turbine for the DeLauri Pump Station Renewable Energy Project in Charlestown... a foreign manufactured 1.5 MW wind turbine by the MWRA, as specified in its November 19, 2009... 1605(a) of Public Law 111-5, Buy American requirements, to the MWRA for the purchase of a...

  5. Workplace Technical Assistance Program (WorkTAP). Section 353 Special Project. (7/1/88-6/30/89).

    ERIC Educational Resources Information Center

    Askov, Eunice N.; Sherow, Sheila M.

    This document is the final report of the first year's operation of a project designed to train literacy and adult education providers and organizations in business, industry, and labor to develop and implement effective workplace literacy programs. The program, which operates in Pennsylvania on the state and regional levels, initiates the…

  6. 75 FR 67718 - Notice of a Project Waiver of Section 1605: (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... California Drinking Water State Revolving Fund (DWSRF)/ARRA loan recipient, for the purchase of a 20-inch... Odusoga, Environmental Engineer, Water Division, Infrastructure Office (WTR-4), (415) 972- 3437, U.S. EPA... unless all of the iron, steel, and manufactured goods used in the project are produced in the...

  7. Soils Project Risk-Based Corrective Action Evaluation Process with ROTC 1 and ROTC 2, Revision 0

    SciTech Connect

    Matthews, Patrick; Sloop, Christina

    2012-04-01

    This document formally defines and clarifies the NDEP-approved process the NNSA/NSO Soils Activity uses to fulfill the requirements of the FFACO and state regulations. This process is used to establish FALs in accordance with the risk-based corrective action (RBCA) process stipulated in Chapter 445 of the Nevada Administrative Code (NAC) as described in the ASTM International (ASTM) Method E1739-95 (NAC, 2008; ASTM, 1995). It is designed to provide a set of consistent standards for chemical and radiological corrective actions.

  8. The Effect of an Energy Audit Service Learning Project on Student Perceptions of STEM Related Disciplines, Personal Behaviors/Actions towards the Environment, and Stewardship Skills

    NASA Astrophysics Data System (ADS)

    Gullo, Michael

    The purpose of this study was to investigate whether or not service learning could be considered an alternative teaching method in an environmental science classroom. In particular, the results of this research show whether an energy audit service learning project influenced student environmental awareness (knowledge of environmental issues, problems, and solutions), student personal actions/behaviors towards the environment, student perceptions and attitudes of science related careers, and community partnerships. Haines (2010) defines service learning as “a teaching and learning strategy that integrates meaningful community service with instruction and reflection to enrich the learning experience, teach civic responsibility, and strengthen communities” (p. 16). Moreover, service learning opportunities can encourage students to step out of their comfort zone and learn from hands-on experiences and apply knowledge obtained from lectures and classroom activities to real life situations. To add to the growing body of literature, the results of this study concluded that an energy audit service learning project did not have a measureable effect on student perceptions and attitudes of science related careers as compared to a more traditional teaching approach. However, the data from this study did indicate that an energy audit service learning project increased students personal actions/behaviors towards the environment more than a direct teaching approach.

  9. Mental health promotion in a school community by using the results from the Well-being Profile: an action research project.

    PubMed

    Puolakka, Kristiina; Haapasalo-Pesu, Kirsi-Maria; Konu, Anne; Astedt-Kurki, Päivi; Paavilainen, Eija

    2014-01-01

    This article presents an action research project as a method to combine science and practical expertise in order to develop the practices of the health care system. The project aimed at developing mental health promotion in the school community in general and at finding tools for timely help when mental health is at risk. The underlying idea is that mental health is an integral part of health and by promoting general well-being it is also possible to promote and ensure mental health at school. The study was conducted in a Finnish lower secondary school of 446 pupils where the pupils are aged between 12 and 15 years. The initial survey was conducted using the School Well-being Profile, a tool developed by Anne Konu. A well-being questionnaire was used to identify the areas in need of improvement, providing the basis for planning and implementing development measures together with the local actors. The instrument proved to be a usable way of collecting feedback of the well-being of the school environment. As a result of the action research project, the school's physical conditions and social relationships improved and appropriate practices for future problem situations were set. PMID:23171651

  10. Idaho Completion Project’s Accelerated Retrieval Project Overview of the Pit 4 Non-Time Critical Removal Action

    SciTech Connect

    T. L. Clements; R. E. Arbon; B. D. Preussner

    2005-02-01

    This paper presents an overview of the Accelerated Retrieval Project performed by the Idaho Completion Project at the Idaho National Laboratory (INL). Topics include an overall description of the process and methods that will retrieve, characterize, and certify newly generated transuranic (TRU) waste for disposal at the Waste Isolation Pilot Plant (WIPP). The retrieval and characterization of buried TRU waste presents unique challenges. Innovative approaches developed and discussed are: excavation, RCRA waste sampling, visual examination, and deployment of the WIPP Central Characterization Project mobile systems to the INL.

  11. 75 FR 22129 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... components, including, but not limited to: The blades, the nacelle (i.e. cover housing that holds the... associated with potential ice throws from the turbine blades. The domestic manufacturer's internal siting... 240, Section 240-166 requires a Special Permit for windmills with minimum setback from property...

  12. 75 FR 10866 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... 2009 (Recovery Act), Public Law 111-5, 123 Stat. 115, 303 (2009) with respect to certain water quality... limited waiver of section 1605 of the Recovery Act (Buy American provision) with respect to certain water... recirculation system that allows optimal water temperatures for culture of June sucker. The recirculation...

  13. Creating and Sustaining a Professional Learning Community to Impact Student Achievement on a High School Campus: An Action Research Project

    ERIC Educational Resources Information Center

    Nichols, Dionne DeShall

    2013-01-01

    Professional learning communities (PLCs) have become one of the most talked about ideas in education today. Many K-12 schools are working to become PLCs in the hope that student learning will improve when adults commit themselves to talking collaboratively about teaching and learning and then take action that will improve student learning and…

  14. An Education Action Zone at Work: Primary Teacher Perceptions of the Efficacy of a Creative Learning and Collaborative Leadership Project

    ERIC Educational Resources Information Center

    Gkolia, Chrysanthi; Brundrett, Mark; Switzer, Jackie

    2009-01-01

    Education Action Zones (EAZs) have formed one of the key elements of government policy in trying to drive up standards and disseminate best practice. However, the initiative has been subject to a sustained critique and questions have remained as to the efficacy of such networks of schools. This article reports on study of one EAZ in the north-west…

  15. 76 FR 79755 - Notice of Final Federal Agency Actions on the Interstate 95 High Occupancy Toll Lanes Project in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... efficiently, provide higher reliability of travel times, and expand travel choices. The actions taken by FHWA..., unless a shorter time is specified in the Federal law pursuant to which judicial review is allowed. FOR....gov . The FHWA Virginia Division Office's normal business hours are 8 a.m. to 5 p.m. (eastern...

  16. New Technologies--New Opportunities? The Potential of Cable in Education and Social Action Broadcasting. Media Project Information.

    ERIC Educational Resources Information Center

    McCron, Robin

    This paper addresses the implications for education and social action broadcasting of proposals for the expansion of cable television contained in two British Government reports: "A Report of the Inquiry into Cable Expansion and and Broadcasting Policy" (the Hunt Report) and a white paper, "The Development of Cable Systems and Services."…

  17. When Soda Is a Social Justice Issue: Design and Documentation of a Participatory Action Research Project with Youth

    ERIC Educational Resources Information Center

    Noonan, James

    2015-01-01

    Schools are increasingly seen as having a promising role to play in reducing adverse health and wellness outcomes among young people. This paper uses a collaborative action research approach to examine the effects of one school's efforts to change its students' eating habits by implementing a "junk-food free campus." By engaging school…

  18. Coordinated international action to accelerate genome-to-phenome with FAANG, The Functional Annotation of Animal Genomes project

    Technology Transfer Automated Retrieval System (TEKTRAN)

    We describe the organization of a nascent international effort - the "Functional Annotation of ANimal Genomes" project - whose aim is to produce comprehensive maps of functional elements in the genomes of domesticated animal species....

  19. Mathematical speech and practical action: a case study of the challenges of including mathematics in a school technology project

    NASA Astrophysics Data System (ADS)

    Bungum, Berit; Manshadi, Saeed; Atle Lysne, Dag

    2014-11-01

    This paper presents a case study of how a teacher and nine-year-old students deal with mathematics in a practical technology project. By analysing videotaped dialogues between teacher and a pair of students working on constructing a house model, we identify challenges of meaningful inclusion of mathematics in the project. The dialogues are analysed in terms of an analytical framework where four categories of interaction patterns are combined with two main paradigms of mathematics teaching: the exercise paradigm and landscapes of interaction. The project in itself has a potential for facilitating landscapes of investigation in mathematics teaching. However, we find that the teacher as well as students adheres to the exercise paradigm when mathematics is involved in the activity. Two illustrating episodes from the project are examined and presented in detail in this paper. The findings illustrate that the conceptions teachers and students hold of what mathematics teaching means can act as an obstacle in attempts to realize mathematics teaching in creative and meaningful contexts for young students. We suggest that making the various purposes of a project more explicit may help overcome this obstacle, and that the mathematics involved might be taught in separate sessions in order to form a constructive part of a cross-curricular project.

  20. Challenges of scaling up and of knowledge transfer in an action research project in Burkina Faso to exempt the worst-off from health care user fees

    PubMed Central

    2011-01-01

    Background Systems to exempt the indigent from user fees have been put in place to prevent the worst-off from being excluded from health care services for lack of funds. Yet the implementation of these mechanisms is as rare as the operational research on this topic. This article analyzes an action research project aimed at finding an appropriate solution to make health care accessible to the indigent in a rural district of Burkina Faso. Research This action research project was initiated in 2007 to study the feasibility and effectiveness of a community-based, participative and financially sustainable process for exempting the indigent from user fees. A interdisciplinary team of researchers from Burkina Faso and Canada was mobilized to document this action research project. Results and knowledge sharing The action process was very well received. Indigent selection was effective and strengthened local solidarity, but coverage was reduced by the lack of local financial resources. Furthermore, the indigent have many other needs that cannot be addressed by exemption from user fees. Several knowledge transfer strategies were implemented to share research findings with residents and with local and national decision-makers. Partnership achievements and difficulties Using a mixed and interdisciplinary research approach was critical to grasping the complexity of this community-based process. The adoption of the process and the partnership with local decision-makers were very effective. Therefore, at the instigation of an NGO, four other districts in Burkina Faso and Niger reproduced this experiment. However, national decision-makers showed no interest in this action and still seem unconcerned about finding solutions that promote access to health care for the indigent. Lessons learned The lessons learned with regard to knowledge transfer and partnerships between researchers and associated decision-makers are: i) involve potential users of the research results from the