Science.gov

Sample records for action project section

  1. The Take Action Project

    ERIC Educational Resources Information Center

    Boudreau, Sue

    2010-01-01

    The Take Action Project (TAP) was created to help middle school students take informed and effective action on science-related issues. The seven steps of TAP ask students to (1) choose a science-related problem of interest to them, (2) research their problem, (3) select an action to take on the problem, (4) plan that action, (5) take action, (6)…

  2. Peer Observation Action Research Project

    ERIC Educational Resources Information Center

    Sandt, Fred-Ole

    2012-01-01

    This paper outlines the initial findings of an action research project that focuses on the possible contribution of peer observation to a more collaborative environment and teachers' professional growth at The University High School. The research component played a significant part as previous attempts to change the culture at the school were…

  3. Action Research Monographs. Complete Set. Pennsylvania Action Research Network, 1998-99. A Section 353 Project of the Pennsylvania Department of Education, Bureau of Adult Basic and Literacy Education. A Learning from Practice Project.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., McKeesport.

    This publication consists of the complete set of 23 monographs developed by the Pennsylvania Action Research Network to supplement the 67 monographs produced over the past 3 years. The specific audience are literacy, General Educational Development (GED), and English-as-a Second Language (ESL) practitioners. The titles are: "Use of Metacognitive…

  4. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... accordance with 40 CFR 1508.4, the Commission and its staff will independently evaluate environmental... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY...

  5. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... accordance with 40 CFR 1508.4, the Commission and its staff will independently evaluate environmental... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY...

  6. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... accordance with 40 CFR 1508.4, the Commission and its staff will independently evaluate environmental... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY...

  7. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... accordance with 40 CFR 1508.4, the Commission and its staff will independently evaluate environmental... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Projects or actions categorically excluded. 380.4 Section 380.4 Conservation of Power and Water Resources FEDERAL ENERGY...

  8. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  9. A Telecommunications-Infused Community Action Project.

    ERIC Educational Resources Information Center

    March, Thomas; Puma, Jessica

    1996-01-01

    The Nonprofit Prophets, a telecommunications-infused community action project, was designed for high school students. Students were teamed with a nonprofit organization and produced videoconferences or Web sites for them. Although specific skills were acquired, students also gained confidence and self-esteem as well as a belief that they…

  10. realfriends: A Student Social Action Project

    ERIC Educational Resources Information Center

    Van Zoost, Steven

    2012-01-01

    "realfriends" is a social action project created by Grade 12 English students in Windsor, Nova Scotia. Its purpose was to create a face-to-face social network that would help change the school climate into a more social space. Interest in socializing is nothing new for teenagers, but these students articulated a worry that people their age may be…

  11. Turbine Engine Hot Section Technology (HOST) Project

    NASA Technical Reports Server (NTRS)

    Sokolowski, Daniel E.; Ensign, C. Robert

    1986-01-01

    The Hot Section Technology (HOST) Project is a NASA-sponsored endeavor to improve the durability of advanced gas turbine engines for commercial and military aircraft. Through improvements in the analytical models and life prediction systems, designs for future hot section components, the combustor and turbine, will be more accurately analyzed and will incorporate features required for longer life in the more hostile operating environment of high performance engines.

  12. Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA project

    SciTech Connect

    Not Available

    1989-09-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

  13. Volatile organic compound remedial action project

    SciTech Connect

    1991-12-01

    This Environmental Assessment (EA) reviews a proposed project that is planned to reduce the levels of volatile organic compound (VOC) contaminants present in the Mound domestic water supply. The potable and industrial process water supply for Mound is presently obtained from a shallow aquifer via on-site production wells. The present levels of VOCs in the water supply drawn from the on-site wells are below the maximum contaminant levels (MCLs) permissible for drinking water under Safe Drinking Water Act (SDWA; 40 CFR 141); however, Mound has determined that remedial measures should be taken to further reduce the VOC levels. The proposed project action is the reduction of the VOC levels in the water supply using packed tower aeration (PTA). This document is intended to satisfy the requirements of the National Environmental Policy Act (NEPA) of 1969 and associated Council on Environmental Quality regulations (40 CFR parts 1500 through 1508) as implemented through U.S. Department of Energy (DOE) Order 5440.1D and supporting DOE NEPA Guidelines (52 FR 47662), as amended (54 FR 12474; 55 FR 37174), and as modified by the Secretary of Energy Notice (SEN) 15-90 and associated guidance. As required, this EA provides sufficient information on the probable environmental impacts of the proposed action and alternatives to support a DOE decision either to prepare an Environmental Impact Statement (EIS) or issue a Finding of No Significant Impact (FONSI).

  14. The Action-Project Method in Counseling Psychology

    ERIC Educational Resources Information Center

    Young, Richard A.; Valach, Ladislav; Domene, Jose F.

    2005-01-01

    The qualitative action-project method is described as an appropriate and heuristic qualitative research method for use in counseling psychology. Action theory, which addresses human intentional, goal-directed action, project, and career, provides the conceptual framework for the method. Data gathering and analysis involve multiple procedures to…

  15. Community Action Projects: Applying Biotechnology in the Real World

    ERIC Educational Resources Information Center

    Nguyen, Phuong D.; Siegel, Marcelle A.

    2015-01-01

    Project-based learning and action research are powerful pedagogies in improving science education. We implemented a semester-long course using project-based action research to help students apply biotechnology knowledge learned in the classroom to the real world. Students had several choices to make in the project: working individually or as a…

  16. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  17. Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan

    SciTech Connect

    1981-05-01

    The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

  18. Critical Literacy for School Improvement: An Action Research Project

    ERIC Educational Resources Information Center

    Cooper, Karyn; White, Robert E.

    2008-01-01

    This article provides an overview of the integrative process of initiating an action research project on literacy for students "at risk" in a Canadian urban elementary school. As the article demonstrates, this requires development of a school-wide framework, which informs the action research project and desired outcomes, and a shared ownership of…

  19. An Action-Research Project: Community Lead Poisoning Prevention

    ERIC Educational Resources Information Center

    Rajaram, Shireen S.

    2007-01-01

    This action-research project focused on gathering data on awareness of lead poisoning, as well as disseminating information on lead poisoning prevention in a metropolitan midwestern city. This project reflects an action-research approach to service learning and was in collaboration with a grass-roots organization. This paper outlines the daunting…

  20. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  1. Programmatic Environmental Report for remedial actions at UMTRA (Uranium Mill Tailings Remedial Action) Project vicinity properties

    SciTech Connect

    Not Available

    1985-03-01

    This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs.

  2. Administrative Leadership as Projection, Social Control, and Action.

    ERIC Educational Resources Information Center

    Reed, Donald B.

    Over the past 50 years, theoretical and methodological problems have plagued the study of leadership. This paper, proposing an alternative theory, argues that leadership has three fundamental components: projection and social control, which are linked by action. Projection is the visualization of a project to be completed. Educational…

  3. The James Bay Project: Reaction or Action?

    ERIC Educational Resources Information Center

    Mackwood, Gae

    1991-01-01

    Discusses the plan to restructure northern Quebec's landscape through the James Bay hydroelectric project. Suggests that the project offers opportunities to study development versus preservation, federal versus provincial powers, and the conflict between business and Native communities. Explores the need to teach students to care about social…

  4. COST ESTIMATING SYSTEMS FOR REMEDIAL ACTION PROJECTS

    EPA Science Inventory

    This paper details the ongoing collaboration between the U.S. EPA and the U.S. Army Corps of Engineers in the development of complementary micro-computer based cost estimating systems for hazardous waste remediations. he U.S. EPA system, "Remedial Action Cost Estimating System" (...

  5. Indigenizing Teacher Education: An Action Research Project

    ERIC Educational Resources Information Center

    Kitchen, Julian; Raynor, Marg

    2013-01-01

    This action research report focuses on a new elective course entitled "Indigenizing Education: Education for/about Aboriginal Peoples" that was developed and taught by two teacher educators--one Euro-Canadian and the other Metis. The purpose of the course was to increase understanding of Indigenous peoples and of the impact of…

  6. The Olympia Proceedings. Section VI: Analysis of the Action Plans.

    ERIC Educational Resources Information Center

    Meyers, Joel; And Others

    1982-01-01

    Within legislative, practice, and professional issues in school psychology, examples of action plans for hypothetical events are presented. These were produced by groups of conference participants to stimulate development of detailed plans for local, state and national use by school psychologists. Action plan resources and implementation and…

  7. 29 CFR 1607.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Policy statement on affirmative action (see section 13B... affirmative action (see section 13B). The Equal Employment Opportunity Coordinating Council was established by... policies concerning the role of affirmative action in the overall equal employment opportunity...

  8. 29 CFR 1607.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Policy statement on affirmative action (see section 13B... affirmative action (see section 13B). The Equal Employment Opportunity Coordinating Council was established by... policies concerning the role of affirmative action in the overall equal employment opportunity...

  9. Project WILD--From Awareness to Action!

    ERIC Educational Resources Information Center

    Charles, Cheryl; Schafer, Rudy

    1984-01-01

    Discusses goals of Project WILD, an environmental and conservation program emphasizing wildlife. Includes instructions for using and sample of "dilemma cards" which allow students to read, discuss, make judgments, and write about hypothetical dilemmas concerning wildlife and/or natural resources. (BC)

  10. 15 CFR 2006.0 - Submission of petitions requesting action under section 301.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Submission of petitions requesting action under section 301. 2006.0 Section 2006.0 Commerce and Foreign Trade Regulations Relating to... FOR ACTION UNDER SECTION 301 OF THE TRADE ACT OF 1974, AS AMENDED § 2006.0 Submission of...

  11. Project InterActions: A Multigenerational Robotic Learning Environment

    ERIC Educational Resources Information Center

    Bers, Marina U.

    2007-01-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both…

  12. The Biodiversity Community Action Project: An STS Investigation

    ERIC Educational Resources Information Center

    Aidin, Amirshokoohi; Mahsa, Kazempour

    2010-01-01

    The Biodiversity Community Action Project is a stimulating and vigorous project that allows students to gain an in-depth understanding of the interconnection between organisms and their environments as well as the connection of science to their lives and society. It addresses key content standards in the National Science Education Standards and…

  13. Action Research Projects in Pre-Service Teacher Education

    ERIC Educational Resources Information Center

    Clayton, Courtney; Meadows, George

    2013-01-01

    Classroom-centered Action Research Projects are an integral component of the M.S. in Elementary Education Program at the University's (pseudonym) College of Education. This article provides a summary and discussion of the projects completed by students in the Science, Technology, Literacy and English Language Learner Specializations of the…

  14. Literacy Learning within Community Action Projects for Social Change

    ERIC Educational Resources Information Center

    Wright, Dana E.; Mahiri, Jabari

    2012-01-01

    This case study describes the literacy development of a struggling reader over a seven-month period as he engaged in a youth-led participatory action research (PAR) project. The project's goal was for youth participants to develop a proposal for productive change in their local community and present it to community stakeholders. The study focused…

  15. Getting to social action: the Youth Empowerment Strategies (YES!) project.

    PubMed

    Wilson, Nance; Minkler, Meredith; Dasho, Stefan; Wallerstein, Nina; Martin, Anna C

    2008-10-01

    This article describes the social action component of the Youth Empowerment Strategies (YES!) project funded by the Centers for Disease Control and Prevention through its community-based prevention research (CBPR) initiative. YES! is designed to promote problem-solving skills, social action, and civic participation among underserved elementary and middle school youth. The after-school program focuses on identifying and building youths' capacities and strengths as a means of ultimately decreasing rates of alcohol, tobacco, and other drug use and other risky behaviors. The article discusses the conceptual models of risk and intervention and factors contributing to successful social action work, including group dynamics, intragroup leadership, facilitator skills, and school-community contexts. Attention is focused on how the nature of the projects themselves played a key role in determining the likelihood of experiencing success. Implications and recommendations for other youth-focused empowerment education projects are discussed, including the effective use of Photovoice in such projects. PMID:16803932

  16. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  17. 56. CROSS SECTION OF POWERHOUSE, PROJECT 1933, EXHIBIT F, SANTA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    56. CROSS SECTION OF POWERHOUSE, PROJECT 1933, EXHIBIT F, SANTA ANA POWERHOUSE NO. 1. SCE drawing no. 5206856 (no date; FERC no. 1933-46). - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  18. Yes, I Can: Action Projects To Resolve Equity Issues in Educational Computing. A Project of ECCO, the Educational Computer Consortium of Ohio.

    ERIC Educational Resources Information Center

    Fredman, Alice, Ed.

    This book presents reports on selected "local action" projects that were developed as part of the Equity in Technology Project, which was inaugurated in 1985 by the Educational Computer Consortium of Ohio (ECCO). The book is organized into three sections, one for each of the populations targeted by the project. An introduction by Alice Fredman…

  19. Play and Literacy: A Collaborative Action Research Project in Preschool

    ERIC Educational Resources Information Center

    Einarsdottir, Johanna

    2014-01-01

    The article describes a collaborative action research in a preschool in Reykjavik. The participants were two preschool teachers who collaborated with researchers at the University of Iceland. The project was set up as a professional development course for the teachers. Emphasis was placed on continuity in children's education, integration of…

  20. An Action Learning Project on Diversity: Pitfalls and Possibilities.

    ERIC Educational Resources Information Center

    Hite, Linda M.

    1997-01-01

    In a college course on diversity in the workplace, students' experiences with conducting a cultural audit of the university as a workplace illustrate the dilemmas that can arise when students conduct action research in a real client system. Despite the inherent problems, the project resulted in significant student learning about the subject and…

  1. Culminating Experience Action Research Projects, Volume 3, Spring 2003.

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Moyer, Peggy S., Ed.

    This document presents the course syllabus for Education 590 Culminating Experience at the University of Tennessee at Chattanooga's teacher licensure program. It also includes action research projects from spring 2003: "'To Track or Untrack...That Is the Question'" (Sarah Armes); "Providing Urban Students with the Motivation to Succeed in School"…

  2. Strategic Approaches to Practice: An Action Research Project

    ERIC Educational Resources Information Center

    Burwell, Kim; Shipton, Matthew

    2013-01-01

    The importance of personal practice for instrumentalists and vocalists is well established among researchers, and axiomatic for practitioners. This paper reports on a phase of an action research project, investigating student approaches to personal practice. Following a preliminary questionnaire study, a residential clinic was conducted by…

  3. Blogging across the Curriculum: An Action Research Project

    ERIC Educational Resources Information Center

    Nichols, Andrea

    2012-01-01

    "Blogging across the curriculum: Integrating blogging in the elementary classroom" is an Action Research Project that sought to explore the level of engagement in the writing process by students in grades 3, 4 & 5 while blogging across the curriculum. Blogging took place in homeroom classrooms as well as in the school's math, science and…

  4. Slipping Pages through Razor Wire: Literacy Action Projects in Jail

    ERIC Educational Resources Information Center

    Jacobi, Tobi

    2008-01-01

    This essay explores the intersection between writing studies and civic engagement through the action projects developed in E465: Prison Literature and Writing. Such literacy activism creates immediate opportunities for advanced undergraduates to more fully understand the work of literacy in contested spaces like jail and extends a call to action…

  5. Project ASSIST: Action Strategies for Implementing Social Transition.

    ERIC Educational Resources Information Center

    Urban League of Greater New Orleans, LA.

    Project ASSIST (Action Strategies for Implementing Social Transition) is an attempt to assess the needs, concerns, problems, strengths, and preferences of low income area residents within the city of New Orleans by developing primary based data. This report presents the findings of two major surveys, in which 1,306 households in eight low income…

  6. Culminating Experience Action Research Projects, Volume 7, Fall 2005

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Fritch, Sarah C., Ed.

    2007-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  7. Culminating Experience Action Research Projects, Volume 10, Spring 2007

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Deaver, Sharon R., Ed.

    2008-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  8. Culminating Experience Action Research Projects, Volume 5, Spring 2004

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Bothman, Susan M., Ed

    2005-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  9. Culminating Experience Action Research Projects, Volume 14, Spring 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  10. Culminating Experience Action Research Projects, Volume 13, Fall 2008

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  11. Culminating Experience Action Research Projects, Volume 17, Fall 2010

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 5900 Culminating…

  12. The Role of Facilitators in Project Action Learning Implementation

    ERIC Educational Resources Information Center

    Cao, Rui; Chuah, Kong Bieng; Chao, Yiu Chung; Kwong, Kar Fai; Law, Mo Yin

    2012-01-01

    Purpose: This paper addresses the importance of a more proactive role of organizational learning (OL) facilitators, learning motivation reinforcer, through a two-part longitudinal study in a case company. The first part of this study aims to investigate and analyze some unexpected challenges in the project action learning-driven (PAL) OL…

  13. Culminating Experience Action Research Projects, Volume 9, Fall 2006

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Ezell, Benjamin T., Ed.

    2010-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  14. Culminating Experience Action Research Projects, Volume 11, Fall 2007

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Deaver, Sharon R., Ed.

    2008-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  15. Uranium Mill Tailings Remedial Action (UMTRA) Surface Project: Project plan. Revision 1

    SciTech Connect

    Not Available

    1993-08-11

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) [Public Law (PL) 95-604, 42 United States Code (USC) 7901], hereinafter referred to as the ``Act,`` authorizes the US Department of Energy (DOE) to stabilize and control surface tailings and ground water contamination. To fulfill this mission, the DOE has established two projects under the Uranium Mill Tailings Remedial Action (UMTRA) Project Office. The Ground Water Project was established in April 1991 as a major project and a separate project plan will be prepared for that portion of the mission. This project plan covers the UMTRA Surface Project, a major system acquisition (MSA).

  16. Beyond You and Me: Stories for Collective Action and Learning? Perspectives from an Action Research Project

    ERIC Educational Resources Information Center

    Gearty, Margaret

    2015-01-01

    This paper explores the combination of storytelling and reflective action research as a means to effect change and learning within and across communities and organizations. Taking the complex challenge of "pro-environmental behaviour change" as an example, the paper reflects on the experiences of a pilot project run for the UK government…

  17. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse

    PubMed Central

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus “alcohol culture.” Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one’s community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course. PMID:27385923

  18. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse.

    PubMed

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course. PMID:27385923

  19. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  20. 39 CFR 778.3 - What categories of facility project actions of the Postal Service are subject to these regulations?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false What categories of facility project actions of the Postal Service are subject to these regulations? 778.3 Section 778.3 Postal Service UNITED STATES POSTAL SERVICE SPECIAL REGULATIONS INTERGOVERNMENTAL REVIEW OF POSTAL SERVICE FACILITY ACTIONS § 778.3...

  1. 39 CFR 778.3 - What categories of facility project actions of the Postal Service are subject to these regulations?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false What categories of facility project actions of the Postal Service are subject to these regulations? 778.3 Section 778.3 Postal Service UNITED STATES POSTAL SERVICE SPECIAL REGULATIONS INTERGOVERNMENTAL REVIEW OF POSTAL SERVICE FACILITY ACTIONS § 778.3...

  2. 39 CFR 778.3 - What categories of facility project actions of the Postal Service are subject to these regulations?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false What categories of facility project actions of the Postal Service are subject to these regulations? 778.3 Section 778.3 Postal Service UNITED STATES POSTAL SERVICE SPECIAL REGULATIONS INTERGOVERNMENTAL REVIEW OF POSTAL SERVICE FACILITY ACTIONS § 778.3...

  3. 39 CFR 778.3 - What categories of facility project actions of the Postal Service are subject to these regulations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false What categories of facility project actions of the Postal Service are subject to these regulations? 778.3 Section 778.3 Postal Service UNITED STATES POSTAL SERVICE SPECIAL REGULATIONS INTERGOVERNMENTAL REVIEW OF POSTAL SERVICE FACILITY ACTIONS § 778.3...

  4. 39 CFR 778.3 - What categories of facility project actions of the Postal Service are subject to these regulations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false What categories of facility project actions of the Postal Service are subject to these regulations? 778.3 Section 778.3 Postal Service UNITED STATES POSTAL SERVICE SPECIAL REGULATIONS INTERGOVERNMENTAL REVIEW OF POSTAL SERVICE FACILITY ACTIONS § 778.3...

  5. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    SciTech Connect

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department

  6. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  7. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  8. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  9. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  10. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  11. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    SciTech Connect

    Not Available

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  12. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Not Available

    1992-10-01

    The Uranium Mill Tallings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1 (Chapter 3, paragraph 2). The UMTRA EPIP covers the time period of November 9, 1992, through November 8, 1993. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  13. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    SciTech Connect

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  14. California Freshwater Shrimp Project: An Eco-Action Project with Real Life Learning.

    ERIC Educational Resources Information Center

    Rogers, Laurette H.

    The California Freshwater Shrimp Project is an example of a student-initiated, eco-action project. Students, from a fourth grade class in the Ross Valley School District in San Rafael, California, were linked to their community and environment through their work in rehabilitating habitat and educating the public. The paper gives an overview of a…

  15. MTR, TRA603. LONGITUDINAL SECTION SHOWS EAST/WEST SECTION AND PROJECTION OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MTR, TRA-603. LONGITUDINAL SECTION SHOWS EAST/WEST SECTION AND PROJECTION OF CANAL BEYOND EAST WALL OF BUILDING; PIPE TUNNEL, BULKHEAD LOCATIONS IN CANAL, SWING-OUT ISOLATION GATE, TUNNEL HATCH UNDER ROADWAY; SUB-PILE AND RABBIT CANAL SECTIONS; BALCONY CONTROL AND INSTRUMENT ROOMS; CATWALK, MAIN AND AUXILIARY HOISTS. AIR COMPRESSOR BUILDING (TRA-626) TO THE NORTH. BLAW-KNOX BKC-3150-3-5, 3/1950. INL INDEX NO. 531-0603-00-098-100004, REV. 7. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  16. Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site

    SciTech Connect

    DOE /NV

    1998-11-01

    This Corrective Action Investigation Plan (CAIP) describes the US Department of Energy's (DOE's) continued environmental investigation of the subsurface Project Shoal Area (PSA) Corrective Action Unit (CAU) 447. The PSA is located in the Sand Springs Mountains in Churchill County, Nevada, about 48 kilometers (km) (30 miles [mi]) southeast of Fallon, Nevada. Project Shoal was part of the Vela Uniform Program which was conducted to improve the US' ability to detect, identify, and locate underground nuclear detonations. The test consisted of detonating a 12-kiloton nuclear device deep underground in granitic rock to determine whether seismic waves produced by an underground nuclear test could be differentiated from seismic waves produced by a naturally occurring earthquake. The test was a joint effort conducted by the US Atomic Energy Commission (AEC) and the US Department of Defense (DoD) in October 1963 (AEC, 1964).

  17. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Policy statement on affirmative action (see section 13B). 60-3.17 Section 60-3.17 Public Contracts and Property Management Other... management objectives, a systematic plan based on sound organizational analysis and problem identification...

  18. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Policy statement on affirmative action (see section 13B). 60-3.17 Section 60-3.17 Public Contracts and Property Management Other Provisions Relating to Public Contracts OFFICE OF FEDERAL CONTRACT COMPLIANCE PROGRAMS, EQUAL EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR...

  19. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 1 2014-07-01 2014-07-01 false Policy statement on affirmative action (see section 13B). 60-3.17 Section 60-3.17 Public Contracts and Property Management Other... management objectives, a systematic plan based on sound organizational analysis and problem identification...

  20. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Policy statement on affirmative action (see section 13B). 60-3.17 Section 60-3.17 Public Contracts and Property Management Other... management objectives, a systematic plan based on sound organizational analysis and problem identification...

  1. 41 CFR 60-3.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Policy statement on affirmative action (see section 13B). 60-3.17 Section 60-3.17 Public Contracts and Property Management Other... management objectives, a systematic plan based on sound organizational analysis and problem identification...

  2. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    SciTech Connect

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  3. Project InterActions: A Multigenerational Robotic Learning Environment

    NASA Astrophysics Data System (ADS)

    Bers, Marina U.

    2007-12-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both parents and children about the mechanical and programming aspects involved in robotics, as well as to initiate them in a learning trajectory with and about technology. Results from this project address different ways in which parents and children learn together and provide insights into how to develop educational interventions that would educate parents, as well as children, in new domains of knowledge and skills such as robotics and new technologies.

  4. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1A: Citations with abstracts, sections 1 through 9

    SciTech Connect

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  5. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    SciTech Connect

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  6. New Fission Cross Section Measurements using a Time Projection Chamber

    NASA Astrophysics Data System (ADS)

    Sadler, Michael

    2008-03-01

    A group of six universities (ACU, California Polytechnic, Colorado School of Mines, Georgia Institute of Technology, Ohio, and Oregon State) and three national laboratories (Los Alamos, Lawrence Livermore, and Idaho) have undertaken the task of building a Time Projection Chamber (TPC) to measure the fission cross sections needed for the next generation of nuclear reactors. The fission TPC concept will be presented, and why we think we can improve on 50 years of fission study.

  7. 76 FR 2949 - Notice of Final Federal Agency Actions on Proposed Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... Construction Project in the State of Washington. Those actions grant approval for the project. DATES: By this... Construction Project. The project includes constructing pontoons sufficient to replace the existing traffic... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Project in...

  8. UMTRA Surface Project management action process document. Final report: Revision 1

    SciTech Connect

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

  9. Using Collaborative Action Learning Projects to Increase the Impact of Management Development

    ERIC Educational Resources Information Center

    Lyso, Ingunn Hybertsen; Mjoen, Kristian; Levin, Morten

    2011-01-01

    This article aims to contribute to the field of human resource development by exploring the conditions that influence the organizational impact of action learning projects. Many organizations use such projects as an integral part of their management development programs. Past research on action learning projects has shown how balancing action and…

  10. Project Charter (MSA-143). [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1986-07-01

    Public Law 95-604, The Uranium Mill Tailings Radiation Control Act of 1978'' as amended assigns to DOE, other Federal agencies, and involved States and Indian tribes, responsibilities for remedial actions at 22 inactive uranium mill tailings sites listed in the Act, and for any other sites designated by the Secretary prior to November 8, 1979. The objective of the UMTRA Project is to provide remedial action at the mill tailings sites and associated vicinity properties in order to stabilize and control the tailings in a safe and environmentally sound manner and to eliminate potential health hazards caused by residual levels of uranium decay products that exceed EPA standards. A total of 24 uranium mill tailings sites. This Project Charter delineates the respective responsibilities and authorities of (The Office of Nuclear Energy) (NE) and (Albuquerque Operations Office) (AL), and defines the terms and conditions for management of the UMTRA Project. Supplementary Project management documents which have been and are being developed pursuant to this Charter include a Project Plan (PP), a Project Management Plan (PMP) and other plans governing the accomplishment of the Project mission Evolution of the program will require updates of the Project Plan and Project Management Plan.

  11. A low complexity reweighted proportionate affine projection algorithm with memory and row action projection

    NASA Astrophysics Data System (ADS)

    Liu, Jianming; Grant, Steven L.; Benesty, Jacob

    2015-12-01

    A new reweighted proportionate affine projection algorithm (RPAPA) with memory and row action projection (MRAP) is proposed in this paper. The reweighted PAPA is derived from a family of sparseness measures, which demonstrate performance similar to mu-law and the l 0 norm PAPA but with lower computational complexity. The sparseness of the channel is taken into account to improve the performance for dispersive system identification. Meanwhile, the memory of the filter's coefficients is combined with row action projections (RAP) to significantly reduce computational complexity. Simulation results demonstrate that the proposed RPAPA MRAP algorithm outperforms both the affine projection algorithm (APA) and PAPA, and has performance similar to l 0 PAPA and mu-law PAPA, in terms of convergence speed and tracking ability. Meanwhile, the proposed RPAPA MRAP has much lower computational complexity than PAPA, mu-law PAPA, and l 0 PAPA, etc., which makes it very appealing for real-time implementation.

  12. Public opinion and communicative action around renewable energy projects

    NASA Astrophysics Data System (ADS)

    Fast, Stewart

    This thesis investigates how rural communities negotiate the development of renewable energy projects. Public and local community acceptance of these new technologies in rural areas around the world is uncertain and spatially uneven and represents an area of emerging public policy interest and one where scholarly theory is rapidly developing. This thesis uses Habermasian concepts of public sphere, communicative action and deliberative democracy, as well as the concept of "wicked problems" from the planning studies literature combined with geographical concepts of place and scale to advance theoretical and empirical understanding of how public opinion on renewable energy technologies is formed in place. It documents energy use patterns, attitudes and socio-political relations at a time when considerable state and business efforts are directed at the construction of solar, wind, biomass and small-hydro technologies in rural regions. These concepts and theories are applied in a case study of rural communities in the Eastern Ontario Highlands, an impoverished area undergoing rapid restructuring driven by centralization of services and amenity migration but with abundant natural resources in form of forests, numerous waterways and open space which have attracted a broad range of new energy developments. Overall high levels of support for alternative energy development particularly for solar power were found, albeit for reasons of local energy security and not for reasons of preventing climate change. There was some evidence that seasonal residents are less supportive of hydro and biomass projects than permanent residents possibly reflecting broader trends in rural economies away from productive uses of land to consumptive appreciation of rural landscapes. The thesis suggests that collective action to advance energy projects in the case study area require agreement along three world-claims (truth, rightness and truthfulness) and that communication leading to discourse

  13. The Older Person's Handbook. Ideas, Projects and Resources for Neighborhood Action. A Mutual Aid Project Handbook.

    ERIC Educational Resources Information Center

    Cala, Michael; And Others

    The Mutual Aid Project (MAP) has developed a community organizing and planning approach which has focused its attention on the continuing role of older people within their neighborhoods. This approach has sought to strengthen not only the day-to-day arrangements for mutual aid and support, but also those actions which will assist groups in…

  14. 77 FR 68790 - Program Comment Issued for Streamlining Section 106 Review for Actions Affecting Post-1945...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    .../archive/NotesDocs/25-25%2815%29_FR.pdf ). (A) Reinforced concrete slab bridges (i) Reinforced concrete... Concrete and Steel Bridges AGENCY: Advisory Council on Historic Preservation. ACTION: Program Comment issued for streamlining Section 106 review for undertakings affecting post-1945 concrete and...

  15. Res Judicata and Section 1983: The Effect of State Court Judgments on Federal Civil Rights Actions.

    ERIC Educational Resources Information Center

    Levenson, Laurie L.

    1979-01-01

    Argues for a consistent approach to determining when Section 1983 litigation may follow state proceedings. Provides guidelines similar to those applied in habeas corpus proceedings for deciding when federal action will be barred. Available from UCLA Law Review, 405 Hilgard Ave., Los Angeles, CA 90024. (IRT)

  16. 40 CFR 49.11 - Actions under section 301(d)(4) authority.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Tribal Authority § 49.11 Actions under section 301(d)(4... unreasonable delay such Federal implementation plan provisions as are necessary or appropriate to protect air... tribal implementation plan meeting the completeness criteria of 40 CFR part 51, appendix V, or does...

  17. UMTRA Ground Water Project management action process document

    SciTech Connect

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards.

  18. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  19. Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2008-01-01

    This report presents the 2007 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. Requirements for CAU 447, as specified in the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense (DOD), and the State of Nevada, includes groundwater monitoring in support of site closure. This is the first groundwater monitoring report prepared by DOE-LM for the PSA.

  20. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Administration on December 16, 2011 (76 FR 78332). This notice applies to all Federal agency decisions, actions... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Light Rail Project in... meaning of 23 U.S.C. 139(l)(1). The actions relate to the East Link Light Rail Transit Project in...

  1. 75 FR 29601 - Notice of Final Federal Agency Actions on a Proposed Highway Project in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ...(1)(1). This action relates to an approval of a proposed highway project corridor. DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(1)(1). A claim... agency actions by issuing approvals for the Placer Parkway Corridor Preservation Project--Tier 1 in...

  2. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  3. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan. Revised

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  4. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    SciTech Connect

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC).

  5. Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project

    SciTech Connect

    Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E.; Yerace, P.J.

    1996-02-01

    Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded.

  6. Action Research and Teacher Thinking: The First Phase of the Action Research on Action Research Project at the University of Wisconsin--Madison.

    ERIC Educational Resources Information Center

    Noffke, Susan E.; Zeichner, Kenneth M.

    This report on action research projects conducted by student teachers as a part of their preservice teacher preparation program focuses on how action research improves the understanding of educational practices by the practitioner-researchers themselves. Two major topics are discussed. First, specific types of claims about the impact of action…

  7. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    SciTech Connect

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

  8. 76 FR 33309 - Guidance for Industry on Citizen Petitions and Petitions for Stay of Action Subject to Section...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... (74 FR 3611), FDA announced the availability of a draft version of this guidance and provided... Stay of Action Subject to Section 505(q) of the Federal Food, Drug, and Cosmetic Act; Availability... and Petitions for Stay of Action Subject to Section 505(q) of the Federal Food, Drug, and Cosmetic...

  9. 77 FR 14464 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ...-94, I-894, and U.S. Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin. Those actions grant.... Highway 45 (Zoo Interchange) in Milwaukee County, Wisconsin, Project I.D. 1060-33-01. The project...

  10. 78 FR 13372 - Notice of Proposed Information Collection; Comment Request: Section 811 Project Rental Assistance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... URBAN DEVELOPMENT Notice of Proposed Information Collection; Comment Request: Section 811 Project Rental...: Section 811 Supportive Housing for Persons with Disabilities--Project Rental Assistance (811 PRA) Program... eligibility and capacity to award and administer the HUD Section 811 Project Rental Assistance funds...

  11. Confirmatory radiological survey of the Grand Junction Projects Office Remedial Action Project exterior portions, 1989-1995

    SciTech Connect

    Forbes, G.H.; Egidi, P.V.

    1997-04-01

    The purpose of this independent assessment was to provide the U.S. Department of Energy (DOE) with an independent verification (IV) that the soil at the Grand Junction Projects Office (GJPO) complies with applicable DOE guidelines. Oak Ridge National Laboratory/ Environmental Technology Section (ORNL/ETS) which is also located at the GJPO, was assigned by DOE as the Independent Verification Contractor (IVC). The assessment included reviews of the decontamination and decommissioning plan, annual environmental monitoring reports, data in the pre- and post-remedial action reports, reassessment reports and IV surveys. Procedures and field methods used during the remediation were reviewed, commented on, and amended as needed. The IV surveys included beta-gamma and gamma radiation scans, soil sampling and analyses. Based on the data presented in the post-remedial action report and the results of the IV surveys, the remediation of the outdoor portions of the GJPO has achieved the objectives. Residual deposits of uranium contamination may exist under asphalt because the original characterization was not designed to identify uranium and subsequent investigations were limited. The IVC recommends that this be addressed with the additional remediation. The IVC is working with the remedial action contractor (RAC) to assure that final documentation WM be sufficient for certification. The IVC will address additional remediation of buildings, associated utilities, and groundwater in separate reports. Therefore, this is considered a partial verification.

  12. Reshaping Literacy in a High Poverty Early Childhood Classroom: One Teacher's Action Research Project

    ERIC Educational Resources Information Center

    Rose, Lynnette; Vaughn, Margaret; Taylor, Linda

    2015-01-01

    This research explores an action research project conducted by the first author focused on supporting her preschool students' literacy and language development. Using observations, interviews, artifacts, and assessment, this research documents the first author's process of conducting an action research project over the course of one year to…

  13. Moving beyond Consultation and into Action with a Client Project

    ERIC Educational Resources Information Center

    Ewing, Sara; Dover, Howard F.

    2012-01-01

    Attempting to implement client-based projects within a single semester often overwhelms students and underwhelms the client and grading professor. In this paper, we share results from a two-year pilot project in which the components of a client project were split between several classes. We discuss the client project model as a valuable teaching…

  14. Commonwealth of Pennsylvania Adult Education Section 353 Special Demonstration Projects. Project Abstracts for the Fiscal Year 1998-1999.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Education, Harrisburg. Bureau of Adult Basic and Literacy Education.

    This document contains 22 brief summaries of the progress made by Pennsylvania Adult Education Section 353 Special Demonstration projects in meeting their goals and objectives. For each project, the following information is included: project director and number; purpose; impact; outcomes; conclusions and recommendations; project continuation and…

  15. Project HEED, Title III, Section 306. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hughes, Orval D.

    Project HEED (Heed Ethnic Educational Depolarization) involves over 1,000 Indian children in grades 1-8 in Arizona. The project target sites are 48 classrooms at Sells, Topowa, San Carlos, Many Farms, Hotevilla, Peach Springs, and Sacaton. Objectives are to increase: (1) reading achievement, (2) affective behavior of teachers, (3) motivation by…

  16. Project Aprendizaje, 1988-89. Evaluation Section Report. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Velasquez, Clara

    In it's first year, Project Aprendizaje served 250 students from the Dominican Republic and Puerto Rico at Seward Park High School in Manhattan (New York). Project objectives were to improve participants' language skills in Spanish and English, help participants successfully complete content area courses needed for graduation, and provide career…

  17. Implementation of UMTRA Project Environmental Audit Action Plan status report for period ending September 30, 1992. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1992-09-01

    This report provides the status of implementation of corrective actions for findings made in an Environmental Audit conducted by DOE Headquarters, Office of Environmental Audit, in June 1991. An Action Plan, dated December 1991, was developed to address the findings. The Action Plan was approved by DOE Headquarters, Office of Environment, Safety and Health, in July 1992. This report provides status for each activity listed in the approved Action Plan. Of 48 findings identified in the August 1991 Environmental Audit Report, 4 required no action, 5 were combined with others and actions to correct 19 are complete. Although it appears no progress has been made since the last status report was issued, UMTRA has completed 89% of the findings identified, compared to 72% identified in the last status report. The table below lists the 20 findings where actions are still underway, the current projected completion date, the organization(s) responsible for taking action on the finding, and the UMTRA Project Off ice staff member assigned responsibility for the finding.

  18. 77 FR 34456 - Notice of Final Federal Agency Actions on the Newberg Dundee Bypass Project Project: Yamhill and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ...: Notice of Limitations on Claims for Judicial Review of Actions by FHWA. SUMMARY: This notice announces... seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before December 10, 2012. If the Federal law that authorizes judicial review of...

  19. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  20. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  1. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  2. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  3. 33 CFR 263.26 - Small beach erosion control project authority (Section 103).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Small beach erosion control project authority (Section 103). 263.26 Section 263.26 Navigation and Navigable Waters CORPS OF ENGINEERS....26 Small beach erosion control project authority (Section 103). (a) Legislative authority....

  4. The calculation of radial dose from heavy ions: predictions of biological action cross sections

    NASA Technical Reports Server (NTRS)

    Katz, R.; Cucinotta, F. A.; Zhang, C. X.; Wilson, J. W. (Principal Investigator)

    1996-01-01

    The track structure model of heavy ion cross sections was developed by Katz and co-workers in the 1960s. In this model the action cross section is evaluated by mapping the dose-response of a detector to gamma rays (modeled from biological target theory) onto the radial dose distribution from delta rays about the path of the ion. This is taken to yield the radial distribution of probability for a "hit" (an interaction leading to an observable end-point). Radial integration of the probability yields the cross section. When different response from ions of different Z having the same stopping power is observed this model may be indicated. Since the 1960s there have been several developments in the computation of the radial dose distribution, in the measurement of these distributions, and in new radiobiological data against which to test the model. The earliest model, by Butts and Katz made use of simplified delta ray distribution functions, of simplified electron range-energy relations, and neglected angular distributions. Nevertheless it made possible the calculation of cross sections for the inactivation of enzymes and viruses, and allowed extension to tracks in nuclear emulsions and other detectors and to biological cells. It set the pattern for models of observable effects in the matter through which the ion passed. Here we outline subsequent calculations of radial dose which make use of improved knowledge of the electron emission spectrum, the electron range-energy relation, the angular distribution, and some considerations of molecular excitation, of particular interest both close to the path of the ion and the outer limits of electron penetration. These are applied to the modeling of action cross sections for the inactivation of several strains of E-coli and B. subtilis spores where extensive measurements in the "thin-down" region have been made with heavy ion beams. Such calculations serve to test the radial dose calculations at the outer limit of electron

  5. Civil Rights--State Action Is a Requirement for the Application of Section 1985 (3) to First Amendment Rights

    ERIC Educational Resources Information Center

    Malpass, Susan C.

    1976-01-01

    In Bellamy v. Masons's Stores, Inc., the Fourth Circuit of Appeals held that section 1985 (3) of the Ku Klux Klan Act displayed a congressional intent that state action be required for an action based on a conspiracy to deprive first amendment rights. The decision is examined in regard to Griffin v. Breckenridge. For journal availability see HE…

  6. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  7. Multiple Intelligences Theory, Action Research, and Teacher Professional Development: The Irish MI Project

    ERIC Educational Resources Information Center

    Hanafin, Joan

    2014-01-01

    This paper presents findings from an action research project that investigated the application of Multiple Intelligences (MI) theory in classrooms and schools. It shows how MI theory was used in the project as a basis for suggestions to generate classroom practices; how participating teachers evaluated the project; and how teachers responded to…

  8. 76 FR 65776 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ...). The actions relate to a proposed highway project, US 41 (Memorial Drive to County M) in Brown County... Department of Transportation, US 41 Brown County Project Office, 1940 West Mason Street, Green Bay, Wisconsin... approvals for the following highway project: US 41 (Memorial Drive to County M), Brown County,...

  9. Climatic Action Plan Project for the state of Veracruz (Mexico)

    NASA Astrophysics Data System (ADS)

    Tejeda, A.; Ochoa, C.

    2007-05-01

    With financing of the British Government and support of the National Institute of Ecology, from April of 2006 to March of 2008 an action plan which intends variability effects and climatic change for the state of Veracruz will be made. This plan will be taken to the state government and will be spread out to manufacturers, industrialists and population. Throughout the Gulf of Mexico, the state of Veracruz is a 745 km coast in length with a width that goes from 156 km in the center to 47 km in the north. The state has large mountains, forests, plains, rivers, cascades, lagoons and coasts. Veracruz is the 10th largest state in Mexico with a 72,420 km2 surface, it is located between 17°00' and 22°28' north latitude and between 93°95' and 98°38' west longitude. Because of the orographic effect, the Sierra Madre Oriental causes the existence of many types of climate, from dry to tropical forest, going through snow on the top of the Pico de Orizaba (5747m of altitude). The wind affects the coasts by not allowing to fish during a hundred days a year (particularly in winter), and on summer tropical waves and occasionally hurricanes affect rivers causing overflow and urban floods in fields. These phenomena do not have a regular affectation; they are subject to climate variability effects. Veracruz is the third state with most population in the country (7.1 million people in 2005), only surpassed by the state of Mexico and Mexico City. Although it occupies 3.7% of the national territory, Veracruz has 6.9% of human population in the country, and is the 6th state of PIB national contribution (240 thousands of millions pesos approximately). Of the possible effects of the climatic change the following can be expected: , , : Most of the coasts of the Gulf of Mexico, low and sandy, less of a meter on the sea level, represent the most vulnerable territory of Veracruz. Towns will be affected, the saline water will infiltrate until the phreatic mantles and the coast electrical

  10. The Federal Art Project: Holger Cahill's Program of Action.

    ERIC Educational Resources Information Center

    Mavigliano, George J.

    1984-01-01

    Under the directorship of Holger Cahill, who drew upon John Dewey's principle of the universal communicability of art, the Federal Art Project of the Great Depression era gave all of the people the opportunity to study and enjoy art. Specific programs of the project are described. (RM)

  11. Children's Ideas about Animal Adaptations: An Action Research Project

    ERIC Educational Resources Information Center

    Endreny, Anna Henderson

    2006-01-01

    In this paper, I describe the action research I conducted in my third-grade science classrooms over the course of two years. In order to gain an understanding of my third-grade students' ideas about animal adaptations and how the teaching of a unit on crayfish influenced these ideas, I used clinical interviews, observations, and written…

  12. Action Research Projects in Distance Education: A Manual.

    ERIC Educational Resources Information Center

    Ramakrishna, C. Pushpa; Prasad, V. S.

    This manual, prepared by the Distance Education Council (India) presents guidelines for action research in distance education, balancing practical research activities with a sound theoretical research base. Chapter 1, "Scope, Purpose and Design of the Manual," suggests several definitions of research; draws distinctions between academic research…

  13. Enhancing Students' Creative Writing Skills: An Action Research Project

    ERIC Educational Resources Information Center

    Nasir, Laraib; Naqvi, Syeda Meenoo; Bhamani, Shelina

    2013-01-01

    This research aimed to improve written expression (composition) skills of 5th grade students of an elite private school. The research was designed under the paradigm of action research. A total sample of 39 students' from the same grade was chosen for the study. The baseline assessment was carried out to explore the pre-intervention writing skill…

  14. Using Action Research Projects to Examine Teacher Technology Integration Practices

    ERIC Educational Resources Information Center

    Dawson, Kara

    2012-01-01

    This study examined the technology integration practices of teachers involved in a statewide initiative via one cycle of action research. It differs from other studies of teacher technology integration practices because it simultaneously involved and provided direct benefits to teachers and researchers. The study used thematic analysis to provide…

  15. Students Upgrading Mathematical Achievement Project SUMA--1989. Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Barrera, Marbella

    Students Upgrading Mathematical Achievement (SUMA) is a part of the Bilingual Mathematics and Science Achievement project for Spanish-speaking Limited English Proficient (LEP) students. Its objective is to provide both remedial tutoring to students lacking mathematics skills and enrichment to students who are potentially gifted in mathematics.…

  16. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    SciTech Connect

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  17. Corrective action investigation plan for Project Shoal Area CAU No. 416

    SciTech Connect

    1996-08-01

    This Corrective Action Investigation Plan (CAIP) is part of an ongoing US Department of Energy (DOE)-funded project for the investigation of Corrective Action Unit (CAU) No. 416, Project Shoal Area (PSA). Project Shoal was conducted to determine whether seismic waves produced by underground nuclear testing could be differentiated from naturally occurring earthquakes. The PSA site is located approximately 30 miles southeast of Fallon, Nevada, in the northern portion of Sand Springs Mountains in Churchill County. This CAIP will be implemented in accordance with the Federal Facility Agreement and Consent Order, the Industrial Sites Quality Assurance Project Plan, and all applicable Nevada Division of Environmental Protection policies and regulations.

  18. Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)

    2001-01-01

    This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

  19. The Constant Cycle: Day to Day Critical Action of the QUIPPED Project

    ERIC Educational Resources Information Center

    Medves, Jennifer M.; Paterson, Margo; Schroder, Cori; Verma, Sarita; Broers, Teresa; Chapman, Christine; O'Riordan, Anne

    2008-01-01

    Action research in the critical paradigm involves a process of continual refection in and on action including the research process itself. In the second in a series of several papers we report on the day-to-day management of the QUIPPED project. The aim was to facilitate patient centred care through inter-professional collaboration with health…

  20. Critical Literacy Practices, Social Action Projects, and the Reader Who Struggles in School

    ERIC Educational Resources Information Center

    Bauer, Courtney Marie

    2011-01-01

    This study, conducted at an urban public school, explored the engagements of five, fourth grade, African American students who struggled with reading in school as they participated in critical literacy practices and social action projects with the assumption that critical analysis of written texts and concrete social actions were necessary for…

  1. 24 CFR 402.6 - What actions must an owner take to request section 8 contract renewal under this part?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false What actions must an owner take to request section 8 contract renewal under this part? 402.6 Section 402.6 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF...

  2. 24 CFR 402.6 - What actions must an owner take to request section 8 contract renewal under this part?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false What actions must an owner take to request section 8 contract renewal under this part? 402.6 Section 402.6 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF...

  3. 24 CFR 402.6 - What actions must an owner take to request section 8 contract renewal under this part?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false What actions must an owner take to request section 8 contract renewal under this part? 402.6 Section 402.6 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF...

  4. 24 CFR 402.6 - What actions must an owner take to request section 8 contract renewal under this part?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false What actions must an owner take to request section 8 contract renewal under this part? 402.6 Section 402.6 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF...

  5. 24 CFR 402.6 - What actions must an owner take to request section 8 contract renewal under this part?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false What actions must an owner take to request section 8 contract renewal under this part? 402.6 Section 402.6 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF...

  6. 30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What information must I include in the âEmergency response action planâ section? 254.23 Section 254.23 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE...

  7. The first tunnel section of the Superconducting Super Collider project

    SciTech Connect

    Lundin, T.K.; Laughton, C.; Nelson, P.P.

    1990-11-01

    The Superconducting Super Collider (SSC) project will be constructed for the United States Department of Energy at a competitively-selected site in Ellis County, Texas, about 30 mile (50 km) south of the central business district of Dallas. The injector system and main collider ring will be housed in 70 mile (110 km) of tunnel, and the project will include additional shafts and underground enclosures with clear spans up to 30 ft (10 m) at depths of more than 250 ft (75 m). The first tunnel segment to be designed and constructed will include approximately 5.9 mile (9.4 km) of 12 ft (3.7 m) finished internal diameter tunnel, four shafts up to 55 ft (16.8 m) diameter, and various connecting tunnels and adits. Construction will be in weak rock lithologies, including mudstones, marls, and chalks with compressive strengths typically between 300 and 2500 psi (2.0 and 17.2 MPa). Design is underway, with an expected bid date before the end of 1990, and with start of construction following in the spring of 1991. 7 refs., 8 figs., 1 tab.

  8. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Agencies qualified under 24 CFR part 883 to refund bonds which financed projects assisted pursuant to 24 CFR part 883, HUD requires compliance with the prohibition on duplicative fees contained in 24 CFR... finance Section 8 projects. 811.110 Section 811.110 Housing and Urban Development Regulations Relating...

  9. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Agencies qualified under 24 CFR part 883 to refund bonds which financed projects assisted pursuant to 24 CFR part 883, HUD requires compliance with the prohibition on duplicative fees contained in 24 CFR... finance Section 8 projects. 811.110 Section 811.110 Housing and Urban Development REGULATIONS RELATING...

  10. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Small flood control project..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Flood Control Policy § 263.23 Small flood control project authority (Section 205). (a) Legislative authority. Section 205 of the...

  11. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Small flood control project..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Flood Control Policy § 263.23 Small flood control project authority (Section 205). (a) Legislative authority. Section 205 of the...

  12. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Small flood control project..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Flood Control Policy § 263.23 Small flood control project authority (Section 205). (a) Legislative authority. Section 205 of the...

  13. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Small flood control project..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS Flood Control Policy § 263.23 Small flood control project authority (Section 205). (a) Legislative authority. Section 205 of the...

  14. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Agencies qualified under 24 CFR part 883 to refund bonds which financed projects assisted pursuant to 24 CFR part 883, HUD requires compliance with the prohibition on duplicative fees contained in 24 CFR... finance Section 8 projects. 811.110 Section 811.110 Housing and Urban Development REGULATIONS RELATING...

  15. Blended Learning and Teaching Writing: A Teacher Action Research Project

    ERIC Educational Resources Information Center

    Camahalan, Faye Marsha G.; Ruley, Andrea G.

    2014-01-01

    This teacher research project focused on utilizing blended learning to teach writing to middle school students. The intervention was designed to fit into individual lessons needed to improve students' writing skills with the main focus on sentence structure. Sixteen (16) 7th grade students were assessed with a writing sample applying the new…

  16. Integrated Quality Control Measurement Project. Findings and Corrective Actions.

    ERIC Educational Resources Information Center

    Price Waterhouse and Co., New York, NY.

    The Integrated Quality Control Measurement Project (IQCMP) of the U.S. Department of Education measured the quality of awards distributed during the 1988-89 award year under the three major Title IV programs: the Pell Grant program, the Campus-Based programs, and the Stafford Loan program, in order to evaluate and improve the quality of the…

  17. 18 CFR 380.4 - Projects or actions categorically excluded.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... place of a minor natural gas pipeline (short segments of buried pipe of 6-inch inside diameter or less... disturbing activity or changes to project works or operation; (14) Exemptions for small conduit hydroelectric... accordance with 40 CFR 1508.4, the Commission and its staff will independently evaluate...

  18. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    SciTech Connect

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

  19. Activists and Writers: Student Expression in a Social Action Literacy Project

    ERIC Educational Resources Information Center

    Epstein, Shira Eve

    2010-01-01

    This article centers the stories of two eighth grade students in the context of a social action literacy project. Their teacher designed curriculum that scaffolded opportunities for them to address English language arts standards while speaking out for social change. The students' responses to the project reveal their civic literacy practices, as…

  20. The Charlotte Action Research Project: A Model for Direct and Mutually Beneficial Community-University Engagement

    ERIC Educational Resources Information Center

    Morrell, Elizabeth; Sorensen, Janni; Howarth, Joe

    2015-01-01

    This article describes the evolution of the Charlotte Action Research Project (CHARP), a community-university partnership founded in 2008 at the University of North Carolina at Charlotte, and focuses particularly on the program's unique organizational structure. Research findings of a project evaluation suggest that the CHARP model's unique…

  1. Learning about Democracy at School: An Action Research Project in Early Childhood Education

    ERIC Educational Resources Information Center

    Sánchez-Blanco, Concepción

    2015-01-01

    This article examines part of an action research project carried out in a Spanish public school. We explain the complex reality of an early childhood education classroom. Focusing on early childhood education, the project was developed in collaboration with a teacher from one of the classrooms of four year olds. Several of the children in the…

  2. Implementing an Action Research Project: A Case Study in Making Decisions and Managing Challenges

    ERIC Educational Resources Information Center

    Greenbank, Paul

    2013-01-01

    This paper examines the challenges involved in implementing an action research project. It discusses a project which uses a series of interventions (unfreezing techniques, cases studies in conjunction with analogical encoding and lecturer input) to encourage students to critically reflect on their approach to career decision-making. This paper…

  3. Library Spaces for Urban, Diverse Commuter Students: A Participatory Action Research Project

    ERIC Educational Resources Information Center

    Brown-Sica, Margaret S.

    2012-01-01

    A data-gathering project using elements of Participatory Action Research was conducted at the Auraria Library, which serves the University of Colorado Denver, the Metropolitan State College of Denver and the Community College of Denver. The project was administered in order to shape a plan to develop a Learning Commons environment at the library.…

  4. Taking Action: An Educator's Guide to Involving Students in Environmental Projects

    ERIC Educational Resources Information Center

    Council for Environmental Education, 2012

    2012-01-01

    Developed in cooperation with the World Wildlife Fund, "Taking Action" inspires ideas and provides models for conducting effective environmental projects--projects that dynamically engage students from start to finish. From adopting species to protecting habitats to saving energy and creating publications, this guide will help educators plan,…

  5. 77 FR 75254 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... actions relate to a proposed highway and transit project within the Tier 2 Elgin O'Hare--West Bypass project corridor, which is located along the Elgin-O'Hare Expressway/Thorndale ] Avenue between Chicago O'Hare International Airport (O'Hare) and Lake Street/US Route 20, and on a proposed alignment...

  6. Full Circle: Stakeholders' Evaluation of a Collaborative Enquiry Action Research Literacy Project

    ERIC Educational Resources Information Center

    Forey, Gail; Firkins, Arthur S.; Sengupta, Sima

    2012-01-01

    This paper reports on school-university collaboration during an action research project, which aimed to build a writing pedagogy for students with Learning Disabilities in the trilingual, biliterate educational context of Hong Kong. The project was established through interpersonal relationships built from the ground up between stakeholders from a…

  7. Journeying between the Education and Hospital Zones in a Collaborative Action Research Project

    ERIC Educational Resources Information Center

    Crow, Jayne; Smith, Lesley; Keenan, Iain

    2006-01-01

    The authors present their journey through the development of an action research project based on collaboration between university health lecturers and a practice development and research nurse in an NHS Trust hospital. The project was designed to raise awareness and improve the practice of all staff in relation to the dignity and respect shown to…

  8. With Hindsight: An Overview of the Autism Spectrum Disorder Participatory Action Research Project

    ERIC Educational Resources Information Center

    Curzon, Joanna

    2008-01-01

    Much has happened since nine teams across New Zealand engaged in a Ministry of Education-funded participatory action research project looking at effective practice for supporting children and young people with autism spectrum disorder (ASD) in education. Building on earlier discussions, the project ran from 2002 to 2004, and until now the story…

  9. Project licensing plan for UMTRA (Uranium Mill Tailings Remedial Action) sites

    SciTech Connect

    Not Available

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process ( Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs.

  10. Cost-estimating systems for remedial-action projects

    SciTech Connect

    Evans, G.M.; Peterson, J.

    1991-01-01

    The paper details the ongoing collaboration between the U.S. EPA and the U.S. Army Corps of Engineers in the development of complementary microcomputer based cost estimating systems for hazardous waste remediations. The U.S. EPA system, Remedial Action Cost Estimating System (RACES), is a technology based application. Estimates generated by RACES are based upon cost engineering relationships. The estimates are designed for use in the early stages of remediation design. The U.S. Army Corps of Engineers system, Micro-Computer Aided Cost Engineering System (M-CACES), is a bottoms-up system for use in situations where detailed design information is available. While both systems will stand alone, they have been designed to allow the transfer of estimates generated by RACES directly into the M-CACES system.

  11. Commonwealth of Pennsylvania Adult Education Section 353 Special Demonstration Projects. Project Abstracts for the Fiscal Year 1997-1998.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Education, Harrisburg. Bureau of Adult Basic and Literacy Education.

    This document contains project abstracts for 29 adult basic and literacy education (ABLE) demonstration programs that were conducted in Pennsylvania in 1997-1998 through grants funded under Section 353 of the Adult Education Act. Each abstract includes the following: project name, number, purpose, impact, outcomes, conclusions/recommendations,…

  12. Implementation of UMTRA Project Environmental Audit Action Plan status report for period ending September 30, 1992

    SciTech Connect

    Not Available

    1992-09-01

    This report provides the status of implementation of corrective actions for findings made in an Environmental Audit conducted by DOE Headquarters, Office of Environmental Audit, in June 1991. An Action Plan, dated December 1991, was developed to address the findings. The Action Plan was approved by DOE Headquarters, Office of Environment, Safety and Health, in July 1992. This report provides status for each activity listed in the approved Action Plan. Of 48 findings identified in the August 1991 Environmental Audit Report, 4 required no action, 5 were combined with others and actions to correct 19 are complete. Although it appears no progress has been made since the last status report was issued, UMTRA has completed 89% of the findings identified, compared to 72% identified in the last status report. The table below lists the 20 findings where actions are still underway, the current projected completion date, the organization(s) responsible for taking action on the finding, and the UMTRA Project Off ice staff member assigned responsibility for the finding.

  13. 12 CFR 165.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Federal savings associations are subject to the restrictions contained in section 38(d) of the FDI Act on... undercapitalized, the savings association shall become subject to the provisions of section 38 of the FDI Act: (i... section 38 of the FDI Act described in paragraph (a)(2) of this section, immediately upon receiving...

  14. 12 CFR 390.455 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... shall become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... section 38 of the FDI Act described in paragraph (a)(2) of this section, immediately upon receiving...

  15. 12 CFR 165.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Federal savings associations are subject to the restrictions contained in section 38(d) of the FDI Act on... undercapitalized, the savings association shall become subject to the provisions of section 38 of the FDI Act: (i... section 38 of the FDI Act described in paragraph (a)(2) of this section, immediately upon receiving...

  16. 12 CFR 390.455 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... shall become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... section 38 of the FDI Act described in paragraph (a)(2) of this section, immediately upon receiving...

  17. 1991 New Mexico economic impact study for the Uranium Mill Tailings Remedial Action Project, Ambrosia Lake, New Mexico, site

    SciTech Connect

    Not Available

    1991-06-01

    The University of New Mexico Bureau of Business and Economic Research completed an abbreviated cost-benefit analysis of the income and employment impact of the US Department of Energy (DOE) and contractor offices in Albuquerque. Since the Project Office will have a significant positive impact on the State`s economy (shown on Table 8), the impact is combined with the impact of remedial actions at the Ambrosia Lake site to highlight the cost-benefit of the entire Uranium Mill Tailings Remedial Action (UMTRA) Project. The UMTRA Project at the Ambrosia Lake site will generate $12.509 million in gross labor income in New Mexico between 1989 and 1994. This includes $1.161 million in federal tax revenue, $1.015 million in State personal income tax revenue, and seven thousand in local tax revenue. The UMTRA Project will generate the equivalent of 84 full-time jobs during the peak year of remedial action at Ambrosia Lake site. New Mexico`s total funding requirement for the UMTRA Project is estimated to be $2.963 million. The net economic benefit of the Ambrosia Lake portion of the UMTRA Project to New Mexico after the State`s share of the project`s cost, the federal income tax, and the $0.936 million income impact of the alternate use of the State funding are subtracted, will be $7.451 million between 1990 and 1994. In Fiscal Year 1990 the UMTRA Project DOE and contractor offices in Albuquerque directly employed 163 people. Another 78 jobs were also maintained in support of the industry sector and 166 jobs were also maintained in other sections of the New Mexico economy. It is estimated that $19 million dollars of income was generated and 1.949 million of State and local taxes were collected. The University of New Mexico study shows that for every dollar the State of New Mexico invests in the UMTRA Project, it will realize $95.05 in gross labor income. This corresponds to a net return on the States investment in the Project of $97.20 for every dollar invested.

  18. 26 CFR 301.7409-1 - Action to enjoin flagrant political expenditures of section 501(c)(3) organizations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Action to enjoin flagrant political... political expenditures of section 501(c)(3) organizations. (a) Letter to organization. When the Assistant... engaged in flagrant political intervention and is likely to continue to engage in political...

  19. 78 FR 51184 - Air Pollution Control: Proposed Actions on Clean Air Act Section 105 Grant to the Lane Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ... AGENCY Air Pollution Control: Proposed Actions on Clean Air Act Section 105 Grant to the Lane Regional... air pollution control programs will be less than its expenditures were for such programs during the... programs were cut by 31% each while land quality program funds were cut by 44%. ODEQ then reduced...

  20. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    SciTech Connect

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  1. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    SciTech Connect

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  2. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  3. 29 CFR 1607.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... voluntary action to achieve equal employment opportunity. As with most management objectives, a systematic... classroom and on-the-job, to employees locked into dead end jobs; and (g) The establishment of a system...

  4. 29 CFR 1607.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... voluntary action to achieve equal employment opportunity. As with most management objectives, a systematic... classroom and on-the-job, to employees locked into dead end jobs; and (g) The establishment of a system...

  5. 29 CFR 1607.17 - Policy statement on affirmative action (see section 13B).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... voluntary action to achieve equal employment opportunity. As with most management objectives, a systematic... classroom and on-the-job, to employees locked into dead end jobs; and (g) The establishment of a system...

  6. Streamlined approach for environmental restoration plan for corrective action unit 416, Mud Pit, Project Shoal Area

    SciTech Connect

    1997-07-01

    This plan addresses the actions necessary for the restoration and closure of the Project Shoal Area (PSA), Surface Corrective Action Unit (CAU) 416, Mud Pit (Corrective Action Site No. 57-09-01), a pit that was used to store effluent produced during drilling of the Post-Shot Borehole PS-1 in 1963. This plan describes the activities that will occur at the site and the steps that will be taken to gather enough data to obtain a notice of completion from the Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented with the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996) and the Industrial Sites Quality Assurance Project Plan (DOE/NV, 1994). The SAFER process is being employed at this CAU where enough information exists about the nature and extent of contamination to propose an appropriate corrective action without completing a Corrective Action Decision Document and Corrective Action Plan. This process combines elements of the Data Quality Objective (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. This has already been completed for the mud pit so it will not be repeated here. The DQOs for the mud pit are presented in the Corrective Action Investigation Plan for Project Shoal Area, CAU No. 416 (DOE/NV, 1996). This observational approach provides a framework for managing uncertainty and planning decision making.

  7. 15 CFR 923.125 - Criteria for section 309 project selection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... funding proposals of special merit which may be funded under 15 CFR 932.4(e). (2) In addition to meeting... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Criteria for section 309 project selection. 923.125 Section 923.125 Commerce and Foreign Trade Regulations Relating to Commerce and...

  8. 15 CFR 923.125 - Criteria for section 309 project selection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... funding proposals of special merit which may be funded under 15 CFR 932.4(e). (2) In addition to meeting... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Criteria for section 309 project selection. 923.125 Section 923.125 Commerce and Foreign Trade Regulations Relating to Commerce and...

  9. A&M. TAN607. Southern sections added in expansion project of 1957. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A&M. TAN-607. Southern sections added in expansion project of 1957. Camera facing northwest. Concrete decontamination section on left end. Photographer: Jack L. Anderson. Date: October 23, 1957. INEEL negative no. 57-5337 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  10. 78 FR 67182 - Announcement of Funding Awards for the Section 811 Project Rental Assistance Demonstration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ...In accordance with section 102 (a)(4)(C) of the Department of Housing and Urban Development Reform Act of 1989, this announcement notifies the public of funding decisions made by the Department in a competition for funding under the Notice of Funding Availability (NOFA) for the Section 811 Project Rental Assistance Demonstration Program. This announcement contains the names of the awardees and......

  11. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Refunding of obligations issued to finance Section 8 projects. 811.110 Section 811.110 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING...

  12. 15 CFR 923.125 - Criteria for section 309 project selection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... funding proposals of special merit which may be funded under 15 CFR 932.4(e). (2) In addition to meeting... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Criteria for section 309 project selection. 923.125 Section 923.125 Commerce and Foreign Trade Regulations Relating to Commerce and...

  13. 15 CFR 923.125 - Criteria for section 309 project selection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... funding proposals of special merit which may be funded under 15 CFR 932.4(e). (2) In addition to meeting... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Criteria for section 309 project selection. 923.125 Section 923.125 Commerce and Foreign Trade Regulations Relating to Commerce and...

  14. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1992-12-31

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

  15. 12 CFR 208.45 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... a capital restoration plan within the schedule established in this subpart (section 38(e)(2)); (iv... respect an acceptable capital restoration plan, the bank shall become subject to the provisions of section... issuing directives under 12 CFR 263.202 and 263.204, unless otherwise provided in section 38 or...

  16. 12 CFR 6.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... critically undercapitalized, the bank shall become subject to the provisions of section 38 of the FDI Act— (i... undercapitalized banks. In addition to the provisions of section 38 of the FDI Act described in paragraph (a)(2)...

  17. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... undercapitalized savings associations. In addition to the provisions of section 38 of the FDI Act described...

  18. 12 CFR 208.45 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... issuing directives under 12 CFR 263.202 and 263.204, unless otherwise provided in section 38 or this... subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital distributions... the FDI Act: (i) Restricting payment of capital distributions and management fees (section 38(d));...

  19. 12 CFR 208.45 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... issuing directives under 12 CFR 263.202 and 263.204, unless otherwise provided in section 38 or this... subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital distributions... the FDI Act: (i) Restricting payment of capital distributions and management fees (section 38(d));...

  20. 12 CFR 208.45 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... issuing directives under 12 CFR 263.202 and 263.204, unless otherwise provided in section 38 or this... subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital distributions... the FDI Act: (i) Restricting payment of capital distributions and management fees (section 38(d));...

  1. 12 CFR 6.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... critically undercapitalized, the bank shall become subject to the provisions of section 38 of the FDI Act— (i... undercapitalized banks. In addition to the provisions of section 38 of the FDI Act described in paragraph (a)(2)...

  2. 12 CFR 6.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... critically undercapitalized, the bank shall become subject to the provisions of section 38 of the FDI Act— (i... undercapitalized banks. In addition to the provisions of section 38 of the FDI Act described in paragraph (a)(2)...

  3. 12 CFR 208.45 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... issuing directives under 12 CFR 263.202 and 263.204, unless otherwise provided in section 38 or this... subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital distributions... the FDI Act: (i) Restricting payment of capital distributions and management fees (section 38(d));...

  4. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... associations are subject to the restrictions contained in section 38(d) of the FDI Act on payment of capital... become subject to the provisions of section 38 of the FDI Act: (i) Restricting payment of capital... undercapitalized savings associations. In addition to the provisions of section 38 of the FDI Act described...

  5. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown.

  6. [Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan]. Revision 4

    SciTech Connect

    Not Available

    1992-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

  7. An Action Research Project Exploring the Psychology Curriculum and Transitions to Employment

    ERIC Educational Resources Information Center

    McMurray, Isabella; Roberts, Pat; Robertson, Ian; Teoh, Kevin

    2011-01-01

    Within the UK, traditional subject-specific areas are increasingly being complemented by the provision of opportunities to foster students' personal development planning as an aide to support their future employment and lifelong learning. This paper describes an action research project which examined employability skills within a psychology…

  8. Chicana Feminist Strategies in a Participatory Action Research Project with Transnational Latina Youth

    ERIC Educational Resources Information Center

    Sanchez, Patricia

    2009-01-01

    This article discusses a participatory action research (PAR) project carried out with three transnational Latina youth in northern California and how the university researcher incorporated Chicana feminist strategies in the study. PAR and Chicana feminism place at the heart of research the knowledge that ordinary people produce, referring to this…

  9. Culminating Experience Action Research Projects, Volume 15, Part 2, Fall 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.

    2009-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience or with school employment. This course, Education…

  10. Emerging Voices in a University Pen-Pal Project: Layers of Discovery in Action Research.

    ERIC Educational Resources Information Center

    Ceprano, Maria A.; Garan, Elaine M.

    1998-01-01

    Describes how a semester-long pen-pal project enabled 18 participating university language arts students, a class of first graders, their teacher, and the university instructors to become co-learners in meaningful, action research. Discusses insights about writing derived from the children's weekly letters. Presents an assessment rubric charting…

  11. A Survey of Food Projects in the English NHS Regions and Health Action Zones in 2001

    ERIC Educational Resources Information Center

    Caraher, Martin; Cowburn, Gill

    2004-01-01

    Background and Objective: This article sets out the findings from an analysis of food projects, with a particular emphasis on fruit and vegetables, from the 26 Health Action Zones (HAZs) in England and those taking place within the former NHS regional areas in 2001. The objective was to gather information on the existing practice to inform future…

  12. The QUIPPED Project: Exploring Relevance and Rigor of Action Research Using Established Principles and Criteria

    ERIC Educational Resources Information Center

    Chapman, Christine; Paterson, Margo; Medves, Jennifer M.

    2011-01-01

    This paper is the last in a series of three manuscripts published in the TQR journal over the past few years. This work is part of a larger program of research that has been carried out by a team of researchers detailing various aspects of a three year action research project carried out from 2005 and 2008. This particular paper addresses issues…

  13. Participation, Roles and Processes in a Collaborative Action Research Project: A Reflexive Account of the Facilitator

    ERIC Educational Resources Information Center

    Avgitidou, Sofia

    2009-01-01

    This paper analyses and discusses the roles and participation of those involved in a collaborative action research project to highlight the factors that influenced their content, quality and intensity. Emphasis is given to the reflections of the facilitator (author) on the processes employed to achieve equal participation and roles in the action…

  14. Re-Placing the Arts in Elementary School Curricula: An Interdisciplinary, Collaborative Action Research Project

    ERIC Educational Resources Information Center

    Trent, Allen; Riley, Jorge-Ayn

    2009-01-01

    This article describes a collaborative action research project aimed at deliberately "re-placing" art in the elementary curriculum through targeted planning, implementation, and assessment of an art integrated unit in an urban 4th grade classroom. Findings and implications should be relevant to elementary teachers, administrators, art specialists,…

  15. Culminating Experience Action Research Projects, Volume 16, Part 1, Spring 2010

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  16. Clients, Colleagues or Experts? Defining Identities in an Action Research Project

    ERIC Educational Resources Information Center

    Coco, Angela; Varnier, Catherine; Deftereos, Chris

    2007-01-01

    This article examines how discourses shaped and were shaped by participants' identities in a participatory action research (PAR) project in a tertiary education environment. The primary researcher and the director of the university's desktop publishing team explored the idea of working together to help the newly formed team to develop strategies…

  17. I Play, Therefore I Am: An Undergraduate Philosophical Action Research Project.

    ERIC Educational Resources Information Center

    Stoll, Sharon Kay; Beller, Jennifer M.; Mathews, Allison; Matthews, Julie; Trainer, Maria; Freitas, Brandon; McLaughlin, Casey; Milke, Mary

    2000-01-01

    Asked undergraduate students' opinions of Descartes' belief that the mind and body are separate, then had them conduct action research projects examining whether the mind-body dilemma might be overcome if teachers valued the essential nature of play and applied it to sport and physical education. Results supported the hypothesis that physical…

  18. Culminating Experience Action Research Projects, Volume 15, Part 1, Fall 2009

    ERIC Educational Resources Information Center

    McAllister, Deborah A., Ed.; Cutcher, Cortney L., Ed.

    2011-01-01

    As a part of the teacher licensure program at the graduate level at The University of Tennessee at Chattanooga (UTC), the M.Ed. Licensure candidate is required to complete an action research project during a 3-semester-hour course that coincides with the 9-semester-hour student teaching experience. This course, Education 590 Culminating…

  19. An Action Research Project's Impact on Teachers' Leadership Attitudes and Perceptions

    ERIC Educational Resources Information Center

    Myers, Nancy; Dillard, Benita R.

    2013-01-01

    California Lutheran University is a regional site for the California Reading and Literature Project (CRLP). In 2010, CRLP began a two-year longitudinal study to examine the effects of participating in an institute called Reframing Teacher Leadership: Action Research Study Group had on PreK-12 teachers' attitudes and perceptions. The…

  20. The Action--Reflection--Modelling (ARM) Pedagogical Approach for Teacher Education: A Malaysia-UK Project

    ERIC Educational Resources Information Center

    Jarvis, Joy; Dickerson, Claire; Thomas, Kit; Graham, Sally

    2014-01-01

    This article presents the Action--Reflection--Modelling (ARM) pedagogical approach for teacher education developed during a Malaysia-UK collaborative project to construct a Bachelor of Education (Honours) degree programme in Primary Mathematics, with English and Health and Physical Education as minor subjects. The degree programme was written…

  1. The Evaluation of an Early Childhood Teacher Preparation Program: An Action Research Project

    ERIC Educational Resources Information Center

    Ragno, Kerry Sullivan

    2013-01-01

    The purpose of this dissertation was to evaluate the effectiveness of an Early Childhood Development Associate of Applied Science (AAS) degree program at one community college as part of an ongoing action research project. Prior to this dissertation study, external and internal barriers prevented the associate degree program stakeholders from…

  2. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... actions relate to a proposed highway and transit project within the Tier 1 Elgin O'Hare--West Bypass study... Elgin O'Hare Expressway on the west and located in Cook and DuPage Counties in Illinois just northwest... within the Elgin O'Hare--West Bypass study area in Cook and DuPage Counties in Illinois. Decisions in...

  3. Development of a Community of Science Teachers: Participation in a Collaborative Action Research Project

    ERIC Educational Resources Information Center

    Fazio, Xavier

    2009-01-01

    This article presents a study exploring the beliefs, knowledge, and practices of four middle and secondary science teachers participating in a collaborative curriculum action research project. Using a case study methodology, the views and practices of these teachers were described and analyzed as they investigated novel ideas about scientific…

  4. Participatory Action Research: Reflections on Critical Incidents in a PAR Project.

    ERIC Educational Resources Information Center

    Santelli, Betsy; Singer, George H. S.; DiVenere, Nancy; Ginsberg, Connie; Powers, Laurie E.

    1998-01-01

    This article describes a participatory action research (PAR) project designed to evaluate Parent to Parent programs in five states. The process of developing a shared understanding of the program and of the purpose for evaluating them, along with an on-going willingness of parents and researchers to compromise, led to creative solutions to…

  5. "Who Did What?": A Participatory Action Research Project to Increase Group Capacity for Advocacy

    ERIC Educational Resources Information Center

    Garcia-Iriarte, E.; Kramer, J. C.; Kramer, J. M.; Hammel, J.

    2009-01-01

    Background: This participatory action research (PAR) project involved a collaboration with a self-advocacy group of people with intellectual disabilities that sought to build group capacity for advocacy. Materials and Methods: This study used a focus group, sustained participatory engagement and a reflexive process to gather qualitative and…

  6. 78 FR 52557 - 30-Day Notice of Proposed Information Collection: Section 811 Project Rental Assistance (PRA) for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT 30-Day Notice of Proposed Information Collection: Section 811 Project Rental... Information Collection: Section 811 Project Rental Assistance (PRA) for Persons with Disabilities....

  7. A Leadership Project in Action: A Project Adventure New Zealand & Dunstan High School Initiative.

    ERIC Educational Resources Information Center

    Schusser, Eric

    1998-01-01

    The Leadership Project uses community partnerships to initiate a systematic response to drug and alcohol use, violence, and crime among teenagers in Alexandria, New Zealand. Aspects of the project include adventure-based violence intervention and counseling in the high school and leadership training at an outdoor education center. Preliminary…

  8. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... savings association (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan within... submit or implement in any material respect an acceptable capital restoration plan, the...

  9. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... savings association (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan within... submit or implement in any material respect an acceptable capital restoration plan, the...

  10. 12 CFR 565.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... savings association (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan within... submit or implement in any material respect an acceptable capital restoration plan, the...

  11. 78 FR 67036 - Extension of Deadline for Action on the Section 126 Petition From Eliot, Maine

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... significant regulatory action under the terms of Executive Order 12866 (58 FR 51735, October 4, 1993) and is therefore not subject to review under Executive Orders 12866 and 13563 (76 FR 3821, January 21, 2011). B... Order 13175 (65 FR 67249, November 9, 2000). It will not have substantial direct effects on...

  12. [Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1992-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

  13. 12 CFR 6.6 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... monitor the condition of the bank (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan within the schedule established in this subpart (section 38(e)(2)); (iv) Restricting the growth of... because it has failed to submit or implement, in any material respect, an acceptable capital...

  14. 12 CFR 325.105 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the FDI Act on payment of capital distributions and management fees. (2) Provisions applicable to... the provisions of section 38 of the FDI Act: (i) Restricting payment of capital distributions and... to the provisions of section 38 of the FDI Act described in paragraph (a)(2) of this...

  15. 12 CFR 325.105 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the FDI Act on payment of capital distributions and management fees. (2) Provisions applicable to... the provisions of section 38 of the FDI Act: (i) Restricting payment of capital distributions and... to the provisions of section 38 of the FDI Act described in paragraph (a)(2) of this...

  16. 12 CFR 325.105 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the FDI Act on payment of capital distributions and management fees. (2) Provisions applicable to... the provisions of section 38 of the FDI Act: (i) Restricting payment of capital distributions and... to the provisions of section 38 of the FDI Act described in paragraph (a)(2) of this...

  17. 12 CFR 325.105 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the FDI Act on payment of capital distributions and management fees. (2) Provisions applicable to... the provisions of section 38 of the FDI Act: (i) Restricting payment of capital distributions and... to the provisions of section 38 of the FDI Act described in paragraph (a)(2) of this...

  18. 12 CFR 325.105 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the FDI Act on payment of capital distributions and management fees. (2) Provisions applicable to... the provisions of section 38 of the FDI Act: (i) Restricting payment of capital distributions and... to the provisions of section 38 of the FDI Act described in paragraph (a)(2) of this...

  19. Water assessment report: Section 13 (c); Great Plains gasification project, Mercer County, ND

    SciTech Connect

    1980-12-01

    The Water Resources Council is completing a water assessment of synfuels development in the Upper Missouri River Basin. This is being done under Section 13(a) of the Federal Nonnuclear Energy Research and Development Act. The assessment area includes the coal deposits in the Mercer County project site. Levels of North Dakota coal gasification development that are several times the production level of the Great Plains gasification project are being examined. This report assesses: (1) the availability of adequate water supplies to meet the water requirements of the project, supporting activities, and other development induced by the project; and (2) the changes in the water resources that will result from the project. Findings of the 13(a) assessment show that water supplies are physically available within the mainstem of the Missouri River in North Dakota to supply the requirements of the gasification facilities and the supporting activities - mining and reclamation, electricity, and project-induced population increases.

  20. Technique of estimation of actual strength of a gas pipeline section at its deformation in landslide action zone

    SciTech Connect

    Tcherni, V.P.

    1996-12-31

    The technique is given which permits determination of stress and strain state (SSS) and estimation of actual strength of a section of a buried main gas pipeline (GP) in the case of its deformation in a landslide action zone. The technique is based on the use of three-dimensional coordinates of axial points of the deformed GP section. These coordinates are received by a full-scale survey. The deformed axis of the surveyed GP section is described by the polynomial. The unknown coefficients of the polynomial can be determined from the boundary conditions at points of connection with contiguous undeformed sections as well as by use of minimization methods in mathematical processing of full-scale survey results. The resulting form of GP section`s axis allows one to determine curvatures and, accordingly, bending moments along all the length of the considered section. The influence of soil resistance to longitudinal displacements of a pipeline is used to determine longitudinal forces. Resulting values of bending moments and axial forces as well as the known value of internal pressure are used to analyze all necessary components of an actual SSS of pipeline section and to estimate its strength by elastic analysis.

  1. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    SciTech Connect

    Not Available

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date.

  2. 75 FR 39633 - Extension of Deadline for Action on Section 126 Petition From New Jersey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ...The EPA is extending by 6 months the deadline for EPA to take action on a petition submitted by the New Jersey Department of Environmental Protection (NJDEP). The petition requests that EPA make a finding under the Clean Air Act (CAA) that the coal-fired Portland Generating Station in Upper Mount Bethel Township, Northampton County, Pennsylvania, is emitting air pollutants in violation of the......

  3. 12 CFR 390.455 - Mandatory and discretionary supervisory actions under section 38.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... State savings association (section 38(e)(1)); (iii) Requiring submission of a capital restoration plan... capital restoration plan, the State savings association shall become subject to the provisions of...

  4. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  5. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  6. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  7. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  8. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock... a proposed highway project, Sunrise Project, I-205 to Rock Creek Junction, Clackamas County, Oregon..., NE., Suite 100, Salem, Oregon 97301, Telephone: (503) 587-4716. The Sunrise Project, I-205 to...

  9. Action Memorandum for General Decommissioning Activities under the Idaho Cleanup Project

    SciTech Connect

    S. L. Reno

    2006-10-26

    This Action Memorandum documents the selected alternative to perform general decommissioning activities at the Idaho National Laboratory (INL) under the Idaho Cleanup Project (ICP). Preparation of this Action Memorandum has been performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the "Superfund Amendments and Reauthorization Act of 1986", and in accordance with the "National Oil and Hazardous Substances Pollution Contingency Plan". An engineering evaluation/cost analysis (EE/CA) was prepared and released for public comment and evaluated alternatives to accomplish the decommissioning of excess buildings and structures whose missions havve been completed.

  10. Project Northland high school interventions: community action to reduce adolescent alcohol use.

    PubMed

    Perry, C L; Williams, C L; Komro, K A; Veblen-Mortenson, S; Forster, J L; Bernstein-Lachter, R; Pratt, L K; Dudovitz, B; Munson, K A; Farbakhsh, K; Finnegan, J; McGovern, P

    2000-02-01

    Project Northland is a randomized community trial initially implemented in 24 school districts and communities in northeastern Minnesota, with goals of delaying onset and reducing adolescent alcohol use using community-wide, multiyear, multiple interventions. The study targets the Class of 1998 from the 6th to 12th grades (1991-1998). The early adolescent phase of Project Northland has been completed, and reductions in the prevalence of alcohol use at the end of 8th grade were achieved. Phase II of Project Northland, targeting 11th- and 12th-grade students, uses five major strategies: (1) direct action community organizing methods to encourage citizens to reduce underage access to alcohol, (2) youth development involving high school students in youth action teams, (3) print media to support community organizing and youth action initiatives and communicate healthy norms about underage drinking (e.g., providing alcohol to minors is unacceptable), (4) parent education and involvement, and (5) a classroom-based curriculum for 11th-grade students. This article describes the background, design, implementation, and process measures of the intervention strategies for Phase II of Project Northland. PMID:10709791

  11. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  12. Toward Solutions: The Work of the Chemistry Action-Research Group. Learning in Science Project. Working Paper No. 35.

    ERIC Educational Resources Information Center

    Osborne, Roger; And Others

    In the action-research phase of the Learning in Science Project, four groups of people worked on problems identified in the project's second (in-depth) phase. The Chemistry Action-Research Group considered problems related to the teaching and learning of ideas associated with particles and physical/chemical changes. Based on findings during the…

  13. 77 FR 65929 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River.... Sec. 139(l)(1). The actions relate to the Tappan Zee Hudson River Crossing Project located in Rockland... the following highway project in the State of New York: Tappan Zee Hudson River Crossing...

  14. 78 FR 42151 - Notice of Final Federal Agency Actions on the Goethals Bridge Replacement Project in New York and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... Federal Highway Administration Notice of Final Federal Agency Actions on the Goethals Bridge Replacement... meaning of 23 U.S.C. 139(l)(1). The actions relate to the Goethals Bridge Replacement Project located in... New York and New Jersey: Goethals Bridge Replacement Project. The Goethals Bridge provides a...

  15. Toward Solutions: The Work of the Physics Action-Research Group. Learning in Science Project. Working Paper No. 32.

    ERIC Educational Resources Information Center

    Osborne, Roger; Schollum, Brendan

    In the action-research phase of the Learning in Science Project, four groups of people worked on problems identified in the project's second (in-depth) phase. The Physics action-research group considered problems related to the teaching and learning of ideas associated with force and motion, suggesting that children's ideas of these concepts might…

  16. A Time Projection Chamber for precision 239Pu(n,f) cross section measurement

    SciTech Connect

    Heffner, M

    2008-01-14

    High precision measurements of the {sup 239}Pu(n,f) cross section have been identified as important for the Global Nuclear Energy Partnership (GNEP) and other programs. Currently the uncertainty on this cross section is of the order 2-3% for neutron energies below 14 MeV and the goal is to reduce this to less than 1%. The Time Projection Chamber (TPC) has been identified as a possible tool to make this high precision measurement.

  17. Aircraft engine hot section technology: An overview of the HOST Project

    NASA Technical Reports Server (NTRS)

    Sokolowski, Daniel E.; Hirschberg, Marvin H.

    1987-01-01

    NASA sponsored the Turbine Engine Hot Section Technology (HOST) Project to address the need for improved durability in advanced aircraft engine combustors and turbines. Analytical and experimental activities aimed at more accurate prediction of the aerothermal environment, the thermomechanical loads, the material behavior and structural responses to loads, and life predictions for cyclic high-temperature operation were underway for the last 7 years. The project has involved representatives from six engineering disciplines who are spread across three work sectors (industry, academia, and NASA). The HOST Project not only initiated and sponsored 70 major activities, but was also the keystone in joining the multiple disciplines and work sectors to focus on critical research needs. A broad overview of the project is given along with initial indications of the project's impact.

  18. Aircraft engine hot section technology: An overview of the HOST Project

    NASA Technical Reports Server (NTRS)

    Sokolowski, Daniel E.; Hirschberg, Marvin H.

    1990-01-01

    NASA sponsored the Turbine Engine Hot Section (HOST) project to address the need for improved durability in advanced aircraft engine combustors and turbines. Analytical and experimental activities aimed at more accurate prediction of the aerothermal environment, the thermomechanical loads, the material behavior and structural responses to loads, and life predictions for cyclic high temperature operation were conducted from 1980 to 1987. The project involved representatives from six engineering disciplines who are spread across three work disciplines - industry, academia, and NASA. The HOST project not only initiated and sponsored 70 major activities, but also was the keystone in joining the multiple disciplines and work sectors to focus on critical research needs. A broad overview of the project is given along with initial indications of the project's impact.

  19. 26 CFR 301.7433-2 - Civil cause of action for violation of section 362 or 524 of the Bankruptcy Code.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 18 2011-04-01 2011-04-01 false Civil cause of action for violation of section 362 or 524 of the Bankruptcy Code. 301.7433-2 Section 301.7433-2 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Judicial Proceedings Civil Actions by...

  20. Management and overview Quality Assurance Program Plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1986-08-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office (DOE/ UMTRA-PO) is the US Department of Energy (DOE) Albuquerque Operations Office (AL) organization charged with the responsibility of managing and coordinating the activities of the various participating organizations and support contractors working on the UMTRA Project. This Quality Assurance Program Plan (QAPP) describes how the DOE/UMTRA-PO, as assisted by the Technical Assistance Contractor (TAC), performs the quality assurance (QA) aspects of managing and coordinating UMTRA Project activities. This QAPP was developed to comply with DOE Order 5700.6A, August, 1981, and AL Order 5700.6B, April, 1984, which contain the criteria applicable to Project QA activities.

  1. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    SciTech Connect

    1997-12-31

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project.

  2. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    1996-10-01

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project.

  3. 2009 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2010-03-01

    This report presents the 2009 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the PSA during fiscal year 2009.

  4. 2008 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2009-03-01

    This report presents the 2008 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof of concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the site during 2008. This is the second groundwater monitoring report prepared by LM for the PSA

  5. 2010 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2011-02-01

    This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended March 2010) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes the results from the groundwater monitoring program during fiscal year 2010.

  6. WSSRAP chemical plant geotechnical investigations for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1990-12-01

    This document has been prepared for the United states Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which consists of MK-Ferguson Company (MKF) and Morrison Knudsen Corporation Environmental Services Group (MKES) with Jacobs Engineering Group (JEG) as MKF's predesignated subcontractor. This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. The WSCP/RP is the proposed disposal cell (DC) site. 39 refs., 24 figs., 12 tabs.

  7. Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan

    SciTech Connect

    Not Available

    1994-07-01

    The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases.

  8. Technical framework for groundwater restoration. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-04-01

    This document provides the technical framework for groundwater restoration under Phase II of the Uranium Mill Tailings Remedial Action (UMTRA) Project. A preliminary management plan for Phase II has been set forth in a companion document titled Preplanning Guidance Document for Groundwater Restoration''. General principles of site characterization for groundwater restoration, restoration methods, and treatment are discussed in this document to provide an overview of standard technical approaches to groundwater restoration.

  9. Implementing the "Marketing You" Project in Large Sections of Principles of Marketing

    ERIC Educational Resources Information Center

    Smith, Karen H.

    2004-01-01

    There is mounting pressure on business education to increase experiential learning at the same time that budget constraints are forcing universities to increase class size. This article explains the design and implementation of the "Marketing You" project in two large sections of Principles of Marketing to bring experiential learning into the…

  10. Action-projection in Japanese conversation: topic particles wa, mo, and tte for triggering categorization activities

    PubMed Central

    Tanaka, Hiroko

    2015-01-01

    Conversation analytic work has revealed how anticipatory completions and preemptive actions can offer invaluable glimpses into the cognitive, contextual, grammatical, and temporal bases of projectability in turn-taking, by virtue of their potential not only as a display of participants' online prediction of roughly what it might take to complete a turn-in-progress but also to plan the next move. While the predicate-final word order and the incremental transformability of turns in Japanese generally lead to delayed projectability of turn-endings, this may be partially offset by the capacity of certain postpositional particles to trigger and propel prospective action trajectories. This article engages in a case study of the topic particle wa (and related particles mo and tte), by demonstrating how its grammatical affordances, the categorization activities, and cognitive processing it can set in motion, coupled with the immediate contextual, and temporal-productional features may coalesce to a point of critical mass, thereby enhancing the projectability of the not-yet-produced trajectory of the current turn. The discussion attempts to contribute to recent debates on ways language-specific lexicogrammatical resources are deeply interlinked with the types of opportunities that are provided for social action. PMID:26379565

  11. Action-projection in Japanese conversation: topic particles wa, mo, and tte for triggering categorization activities.

    PubMed

    Tanaka, Hiroko

    2015-01-01

    Conversation analytic work has revealed how anticipatory completions and preemptive actions can offer invaluable glimpses into the cognitive, contextual, grammatical, and temporal bases of projectability in turn-taking, by virtue of their potential not only as a display of participants' online prediction of roughly what it might take to complete a turn-in-progress but also to plan the next move. While the predicate-final word order and the incremental transformability of turns in Japanese generally lead to delayed projectability of turn-endings, this may be partially offset by the capacity of certain postpositional particles to trigger and propel prospective action trajectories. This article engages in a case study of the topic particle wa (and related particles mo and tte), by demonstrating how its grammatical affordances, the categorization activities, and cognitive processing it can set in motion, coupled with the immediate contextual, and temporal-productional features may coalesce to a point of critical mass, thereby enhancing the projectability of the not-yet-produced trajectory of the current turn. The discussion attempts to contribute to recent debates on ways language-specific lexicogrammatical resources are deeply interlinked with the types of opportunities that are provided for social action. PMID:26379565

  12. Reining in agency action: the rejected proposal rule and Section 1011 of the 2003 Medicare Act.

    PubMed

    Charles, Sabrina

    2006-01-01

    Section 1011 of the 2003 Medicare Act authorized the disbursement of over one billion dollars to healthcare providers that provide uncompensated emergency medical care to undocumented immigrants. In 2005, the Centers for Medicare and Medicaid Services (CMS) issued its final interpretation of the statute. Despite previous statementsto the contrary, CMS conditioned eligibilityfor Section 1011 funds on the collection of certain immigration status-related information from patients seeking emergency care. Prior to the issuance of CMS' final guidance, the House defeated House Resolution 3722, which was substantially similar to the CMS final guidance. This Article argues that the House's rejection of H.R. 3722 renders CMS's final guidance invalid under the analysis set forth in Chevron, U.S.A. Inc. v. National Resources Defense Council, Inc. PMID:17260547

  13. The Dilemma of High Level Planning in Distributed Agile Software Projects: An Action Research Study in a Danish Bank

    NASA Astrophysics Data System (ADS)

    Svejvig, Per; Fladkjær Nielsen, Ann-Dorte

    The chapter reports on an action research study with the aim to design a high level planning process in distributed and co-located software projects based on agile methods. The main contributions are the insight that high level planning process is highly integrated with other project disciplines and specific steps has to be taken to apply the process in distributed projects; and the action research approach is indeed suitable to software process improvements.

  14. Adult Literacy Action Campaign: Projects around Australia. A Review of State and Territory Level Adult Literacy Projects Funded under the Adult Literacy Action Campaign of the National Policy on Languages. Occasional Paper Number 3.

    ERIC Educational Resources Information Center

    Australian Advisory Council on Languages and Multicultural Education, Canberra.

    This collection of papers is a review of the adult literacy projects in Australia funded under the 1987-89 Adult Literacy Action Campaign (ALAC) of the National Policy on Languages. Fourteen authors describe various literacy projects and, often, their outcomes. The projects described are grouped in seven areas. On the subject of Literacy Training…

  15. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... removal of a project, if the United States does not take over a project and no new power or nonpower... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of...

  16. Key programmatic steps and activities for implementing the Uranium Mill Tailings Remedial Action Project. [UMTRA Project

    SciTech Connect

    Not Available

    1985-07-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) was enacted based upon findings by Congress that uranium mill tailings located at active and inactive hazard to the public, and that protection of the public health, safety and welfare, and the regulations of interstate commerce, require that every reasonable effort be made to provide for the stabilization, disposal, and control in a safe and environmentally sound manner of such tailings in order to prevent or minimize radon diffusion into the environment and to prevent or minimize other environmental hazards from such tailings.'' A general understanding of the steps leading to elimination of the hazards associated with designated uranium mill tailings sites, and the parties involved in that effort, are presented in this document. A representative schedule is also presented in this document to show both program sequence and activity interdependence. Those activities that have the most potential to influence program duration, because of the significant amount of additional time that may be required, include identification and selection of a suitable site, field data collection delays due to weather, actual acquisition of the designated or alternate disposal site, construction delays due to weather, and site licensing. This document provides an understanding of the steps, the sequence, the parties involved, and a representative duration of activities leading to remedial action and cleanup at the designated inactive uranium mill tailings sites. 10 refs., 5 figs., 1 tab.

  17. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Classification of projects for review under Section 3.8 of the Compact. 401.35 Section 401.35 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Project Review Under Section 3.8 of the Compact...

  18. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for...

  19. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Section 8 project-based assistance programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development GENERAL HUD PROGRAM REQUIREMENTS; WAIVERS Section...

  20. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Classification of projects for review under Section 3.8 of the Compact. 401.35 Section 401.35 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Project Review Under Section 3.8 of the Compact...

  1. Cooperative and Context-Based Learning on Eletrochemical Cells in Lower Secondary Chemistry: A Project of Participatory Action Research

    ERIC Educational Resources Information Center

    Markic, Silvija; Eilks, Ingo

    2006-01-01

    This paper discusses a project of Participatory Action Research (PAR) on lower secondary chemistry education. In this ongoing project, practicing teachers and university researchers in chemical education jointly carry out projects for developing and evaluating new lesson plans. The focus of the PAR group is to develop teaching/learning activities…

  2. Industrial Sites Project Establishment of Final Action Levels, Rev. No.: 0

    SciTech Connect

    Boehlecke, Robert F.

    2006-02-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  3. A case study of the development of environmental action projects from the framework of participatory action research within two middle school classrooms

    NASA Astrophysics Data System (ADS)

    Charmatz, Kim

    The purpose of this study was to understand student and teacher empowerment through a socially critical environmental education perspective. The main research question guiding this study was: How do participants make sense of a learning experience in which students design and carry out an environmental action project in their community? This study used participatory action research and critical theory as practical and theoretical frameworks. These frameworks were relevant as this study sought to examine social change, power, and relationships through participants' experiences. The context of this study was within one seventh and one eighth grade classroom participating in environmental projects. The study was conducted in spring 2005 with an additional follow-up data collection period during spring 2006. The school was located in a densely populated metropolitan suburb. Fifty-three students, a teacher researcher, and three science teachers participated. Data sources were written surveys, scores on Middle School Environmental Literacy Survey Instrument (MSELI), observations, interviews, and student work. This study used a mixed methodological approach. Quantitative data analysis involved dependent samples t-test scores on the MSELI before and after the completion of the projects. Qualitative data were analyzed using an inductive analysis approach. This study has implications for educators interested in democratic education. Environmental action projects provide a context for students and teachers to learn interdisciplinary content knowledge, develop personal beliefs, and learn ways to take action in their communities. This pedagogy has the potential to increase cooperation, communication, and tensions within school communities. Students' participation in the development of environmental action projects may lead to feelings of empowerment or being able to make a difference in their community, as an individual or member of a group. Future research is needed to discern

  4. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado

    SciTech Connect

    Not Available

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown.

  5. Groundwater protection management program plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

  6. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    SciTech Connect

    Not Available

    1993-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  7. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    SciTech Connect

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  8. 76 FR 45649 - Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange Project: Jackson County, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... Federal Highway Administration Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange... the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, I-5: Fern Valley... Administration, 530 Center Street, NE., Suite 420, Salem, Oregon 97301, Telephone: (503) 316-2559. The I-5:...

  9. 78 FR 27473 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... (New NY Bridge) Project in New York, in the Federal Register at FR Doc. 2012-26799. Tappan Zee Hudson... Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River... within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the Tappan Zee Hudson River...

  10. 78 FR 26104 - Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Federal Highway Administration Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road... project, OR 62: I-5 to Dutton Road (Medford) in Jackson County, Oregon. This action grants approval for...: (503) 231-6179. The OR62: I-5 to Dutton Road Environmental Impact Statement (EIS) is available...

  11. Adolescent's perceptions and expectations of parental action on children's smoking and snus use; national cross sectional data from three decades

    PubMed Central

    Nilsson, Maria; Weinehall, Lars; Bergström, Erik; Stenlund, Hans; Janlert, Urban

    2009-01-01

    Background Parents play a vital role as children develop tobacco behaviours. Many parents feel unsure about their possibility to influence their teenager's lifestyle. Knowledge about young people's acceptance for parental intervention could increase parental involvement. The overall objective of this study was to explore adolescents' perceptions and expectations of parental action regarding children's smoking and snus use, and whether they have changed over time. To see if there were differences whether the adolescent was a tobacco user or not the adolescents' tobacco use was followed; and described to put the findings on their perceptions and expectations of parental action in a context. Methods The study used a repeated cross-sectional design, reporting Swedish national data from three decades. Data were collected in 1987, 1994 and 2003 by a questionnaire mailed to homes, in total to 13500 persons. The annual samples, which were random and national representative, consisted of 4500 young people aged 13, 15 and 17 yr, 1500 individuals per age group. The sampling and data collection procedures were done the same way during each survey. Chi2- tests were used to evaluate differences in distributions. Results Adolescents in all age groups became more positive toward parental action over time. In 2003, more then 86% of the adolescents, including both smokers and non-smokers, strongly supported parental action on their children's smoking by trying to persuade them not to smoke (94%), by not smoking themselves (87%) and by not allowing their children to smoke at home (86%). Both non-smokers and smokers supported the idea of parental action in a similar way. Reduced pocket money had a weak support (42%), especially from girls. Eighty-nine percent of the adolescents expected their parents to act against smoking and 85% against snus use. Smoking was stable at 8% in 1987 and 1994 but decreased to 4% in 2003. In 1987 the snus use prevalence was 4% and in 2003 it was 3%. Snus

  12. Oak Ridge background soils project provides data for remedial action evaluation

    SciTech Connect

    Watkins, D.R.; Lee, S.Y.; Hatmaker, T.L.; McGinn, C.W.; Nourse, B.D.; Schmoyer, R.L.; Burgoa, B.B.; Lietzke, D.A.

    1994-09-01

    Many constituents of potential concern for human health occur naturally at low concentrations in soils. The primary objective of the Background Soil Characterization Project (BSCP) was to provide fully validated and defensible, reservation-wide background concentration data on significant potential contaminants of concern (organics, inorganics, and radionuclides) in natural soils on the Oak Ridge Reservation (ORR). The data are particularly significant for remedial action projects; the data can be used to establish technical guidance and the basis for realistic cleanup requirements at hazardous waste sites on the reservation. Other objectives included providing baseline data for conducting contaminated site assessments and quantifying estimates of human health risk associated with background levels of potentially hazardous constituents in soils.

  13. Quarry geotechnical report for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1990-11-01

    This report has been prepared for the United States Department of Energy's (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which is MK-Ferguson Company (MK-Ferguson) with Jacobs Engineering Group (JEG) as its designated subcontractor. The Weldon Spring site (WSS) comprises the Weldon Spring quarry area and the Weldon Spring chemical plant and raffinate pit areas. This report presents the results of geotechnical investigations conducted during 1989--1990 at the proposed Weldon Spring quarry staging and water treatment facilities in the quarry area. The facilities are intended for treatment of water removed from the quarry area. An access road and a decontamination pad will be necessary for handling and transportation of bulk waste. Results of previous geotechnical investigations performed by other geoscience and environmental engineering firms in the quarry area, were reviewed, summarized and incorporated into this report. Well logging, stratigraphy data, piezometer data, elevations, and soil characteristics are also included.

  14. 31 CFR 30.13 - Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Q-13: What actions are necessary for... compensation requirement)? 30.13 Section 30.13 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.13 Q-13: What actions are...

  15. 31 CFR 30.12 - Q-12: What actions are necessary for a TARP recipient to comply with section 111(d) of EESA (the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Q-12: What actions are necessary for... requirement)? 30.12 Section 30.12 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.12 Q-12: What actions are necessary for a...

  16. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    SciTech Connect

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE.

  17. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    SciTech Connect

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  18. 75 FR 364 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... States of a satisfactory quality] to Valley City, ND for the Zenon ZeeWeed 1000 membrane filter... exception to Section 1605 of ARRA. This action permits the purchase of the Zenon ZeeWeed 1000 membrane...Weed 1000 model of submerged membranes which are manufactured in Canada. Section 1605 of the...

  19. Science in Action: How Middle School Students Are Changing Their World through STEM Service-Learning Projects

    ERIC Educational Resources Information Center

    Newman, Jane L.; Dantzler, John; Coleman, April N.

    2015-01-01

    The purpose of Science in Action (SIA) was to examine the relationship between implementing quality science, technology, engineering, and math (STEM) service-learning (SL) projects and the effect on students' academic engagement in middle school science, civic responsibility, and resilience to at-risk behaviors. The innovative project funded…

  20. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1

    SciTech Connect

    Findlay, Rick

    2006-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.

  1. A Time Projection Chamber for High Accuracy and Precision Fission Cross-Section Measurements

    SciTech Connect

    T. Hill; K. Jewell; M. Heffner; D. Carter; M. Cunningham; V. Riot; J. Ruz; S. Sangiorgio; B. Seilhan; L. Snyder; D. M. Asner; S. Stave; G. Tatishvili; L. Wood; R. G. Baker; J. L. Klay; R. Kudo; S. Barrett; J. King; M. Leonard; W. Loveland; L. Yao; C. Brune; S. Grimes; N. Kornilov; T. N. Massey; J. Bundgaard; D. L. Duke; U. Greife; U. Hager; E. Burgett; J. Deaven; V. Kleinrath; C. McGrath; B. Wendt; N. Hertel; D. Isenhower; N. Pickle; H. Qu; S. Sharma; R. T. Thornton; D. Tovwell; R. S. Towell; S.

    2014-09-01

    The fission Time Projection Chamber (fissionTPC) is a compact (15 cm diameter) two-chamber MICROMEGAS TPC designed to make precision cross-section measurements of neutron-induced fission. The actinide targets are placed on the central cathode and irradiated with a neutron beam that passes axially through the TPC inducing fission in the target. The 4p acceptance for fission fragments and complete charged particle track reconstruction are powerful features of the fissionTPC which will be used to measure fission cross-sections and examine the associated systematic errors. This paper provides a detailed description of the design requirements, the design solutions, and the initial performance of the fissionTPC.

  2. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995

    SciTech Connect

    1995-12-01

    This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  3. Reducing Uncertainties in Neutron-Induced Fission Cross Sections Using a Time Projection Chamber

    NASA Astrophysics Data System (ADS)

    Manning, Brett; Niffte Collaboration

    2015-10-01

    Neutron-induced fission cross sections for actinides have long been of great interest for nuclear energy and stockpile stewardship. Traditionally, measurements were performed using fission chambers which provided limited information about the detected fission events. For the case of 239Pu(n,f), sensitivity studies have shown a need for more precise measurements. Recently the Neutron Induced Fission Fragment Tracking Experiment (NIFFTE) has developed the fission Time Projection Chamber (fissionTPC) to measure fission cross sections to better than 1% uncertainty by providing 3D tracking of fission fragments. The fissionTPC collected data to calculate the 239Pu(n,f) cross section at the Weapons Neutron Research facility at the Los Alamos Neutron Science Center during the 2014 run cycle. Preliminary analysis has been focused on studying particle identification and target and beam non-uniformities to reduce the uncertainty on the cross section. Additionally, the collaboration is investigating other systematic errors that could not be well studied with a traditional fission chamber. LA-UR-15-24906.

  4. 31 CFR 30.13 - Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on executive... Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.13 Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on...

  5. 31 CFR 30.13 - Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on executive... Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.13 Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on...

  6. 31 CFR 30.13 - Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on executive... Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.13 Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on...

  7. 31 CFR 30.13 - Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on executive... Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE § 30.13 Q-13: What actions are necessary for a TARP recipient to comply with section 111(e) of EESA (the shareholder resolution on...

  8. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Classification of projects for review under Section 3.8 of the Compact. 401.35 Section 401.35 Conservation of Power and Water... water resources of the Basin and is not required to be submitted under Section 3.8 of the Compact:...

  9. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Classification of projects for review under Section 3.8 of the Compact. 401.35 Section 401.35 Conservation of Power and Water... water resources of the Basin and is not required to be submitted under Section 3.8 of the Compact:...

  10. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Classification of projects for review under Section 3.8 of the Compact. 401.35 Section 401.35 Conservation of Power and Water... water resources of the Basin and is not required to be submitted under Section 3.8 of the Compact:...

  11. 24 CFR 5.653 - Section 8 project-based assistance programs: Admission-Income-eligibility and income-targeting.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... programs: Admission-Income-eligibility and income-targeting. 5.653 Section 5.653 Housing and Urban... Disabilities: Family Income and Family Payment; Occupancy Requirements for Section 8 Project-Based Assistance... programs: Admission—Income-eligibility and income-targeting. (a) Applicability. This section...

  12. 24 CFR 5.657 - Section 8 project-based assistance programs: Reexamination of family income and composition.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... programs: Reexamination of family income and composition. 5.657 Section 5.657 Housing and Urban Development...: Reexamination of family income and composition. (a) Applicability. This section states requirements for reexamination of family income and composition in the Section 8 project-based assistance programs, except...

  13. 24 CFR 5.657 - Section 8 project-based assistance programs: Reexamination of family income and composition.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... programs: Reexamination of family income and composition. 5.657 Section 5.657 Housing and Urban Development...: Reexamination of family income and composition. (a) Applicability. This section states requirements for reexamination of family income and composition in the Section 8 project-based assistance programs, except...

  14. 24 CFR 5.657 - Section 8 project-based assistance programs: Reexamination of family income and composition.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... programs: Reexamination of family income and composition. 5.657 Section 5.657 Housing and Urban Development...: Reexamination of family income and composition. (a) Applicability. This section states requirements for reexamination of family income and composition in the Section 8 project-based assistance programs, except...

  15. 24 CFR 5.657 - Section 8 project-based assistance programs: Reexamination of family income and composition.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... programs: Reexamination of family income and composition. 5.657 Section 5.657 Housing and Urban Development...: Reexamination of family income and composition. (a) Applicability. This section states requirements for reexamination of family income and composition in the Section 8 project-based assistance programs, except...

  16. 24 CFR 5.657 - Section 8 project-based assistance programs: Reexamination of family income and composition.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... programs: Reexamination of family income and composition. 5.657 Section 5.657 Housing and Urban Development...: Reexamination of family income and composition. (a) Applicability. This section states requirements for reexamination of family income and composition in the Section 8 project-based assistance programs, except...

  17. Towards a Reflection Repertoire: Using a Thinking Tool to Understand Tensions in an Action Research Project

    ERIC Educational Resources Information Center

    Aas, Marit

    2014-01-01

    Most action researchers agree that action research consists of cycles of planning, acting, reflecting, and taking further action. However, in action research literature, there is something missing. The nature of reflection in the action research process, including its relationship with the tensions that arise while discussing purposes, processes,…

  18. Simulated lesion, human observer performance comparison between thin-section dedicated breast CT images versus computed thick-section simulated projection images of the breast

    PubMed Central

    Chen, L; Boone, JM; Abbey, CK; Hargreaves, J; Bateni, C; Lindfors, KK; Yang, K; Nosratieh, A; Hernandez, A; Gazi, P

    2015-01-01

    Objectives The objective of this study was to compare the lesion detection performance of human observers between thin-section computed tomography images of the breast, with thick-section (>40 mm) simulated projection images of the breast. Methods Three radiologists and six physicists each executed a two alterative force choice (2AFC) study involving simulated spherical lesions placed mathematically into breast images produced on a prototype dedicated breast CT scanner. The breast image data sets from 88 patients were used to create 352 pairs of image data. Spherical lesions with diameters of 1, 2, 3, 5, and 11 mm were simulated and adaptively positioned into 3D breast CT image data sets; the native thin section (0.33 mm) images were averaged to produce images with different slice thicknesses; average section thicknesses of 0.33 mm, 0.71 mm, 1.5 mm, and 2.9 mm were representative of breast CT; the average 43 mm slice thickness served to simulate simulated projection images of the breast. Results The percent correct of the human observer’s responses were evaluated in the 2AFC experiments. Radiologists lesion detection performance was significantly (p<0.05) better in the case of thin-section images, compared to thick section images similar to mammography, for all but the 1 mm lesion diameter lesions. For example, the average of three radiologist’s performance for 3 mm diameter lesions was 92 % correct for thin section breast CT images while it was 67 % for the simulated projection images. A gradual reduction in observer performance was observed as the section thickness increased beyond about 1 mm. While a performance difference based on breast density was seen in both breast CT and the projection image results, the average radiologist performance using breast CT images in dense breasts outperformed the performance using simulated projection images in fatty breasts for all lesion diameters except 11 mm. The average radiologist performance outperformed that of the

  19. Commonwealth of Pennsylvania Adult Education Section 353 Special Demonstration Projects. Project Abstracts for the Fiscal Year 1996-1997.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Education, Harrisburg. Bureau of Adult Basic and Literacy Education.

    This booklet describes 26 projects funded by Pennsylvania (PA) Bureau of Adult Basic and Literacy Education (ABLE). Descriptions include title, purpose, impact, project outcomes, conclusions or recommendations, project continuation or future implications, product, project director, and descriptors. The following projects are profiled: AchievE:…

  20. Commonwealth of Pennsylvania Adult Education Section 353 Special Demonstration Projects. Project Abstracts for the Fiscal Year 1993-1994.

    ERIC Educational Resources Information Center

    Werner, Evelyn C., Comp.; Harmon, Cheryl M., Comp.

    This book contains 90 one-page project abstracts for adult basic education (ABE) in Pennsylvania. Each abstract contains the following information: project director's name, address and telephone number; products produced by the project; descriptors; and purpose, procedures, and summary of findings of the project. Projects are indexed by topics…

  1. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    SciTech Connect

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  2. Diagnostic accuracy of remote frozen sections compared with paraffin-embedded sections: a telepathology project in Austria

    NASA Astrophysics Data System (ADS)

    Moser, Patrizia; Soegner, Peter I.; Stadlmann, Sonja; Jacobs, Jan; Mikuz, Gregor

    2000-04-01

    The purpose of the present study was to evaluate the diagnostic accuracy of remote frozen sections examined by telepathology. The gold standard was the diagnosis made using direct examination of paraffin-embedded sections. A consecutive series of 134 frozen-section cases were examined by six qualified pathologists. We used the Zeiss telepathology system with robot microscopy, which allowed different magnifications and fields of view to be chosen. The wide-area network used the TCP/IP protocol. The diagnosis made on the frozen sections was compared with the final diagnosis in the paraffin-embedded sections. Times were recorded for each telepathology session, as well as the users comments on usability and software, and on any communication problems which occurred. In addition, we evaluated the importance of the macroscopic sampling of the surgical specimen, applied to each type of tissue. The diagnostic evaluation showed complete agreement in approximately 80% of cases, in 20% diagnosis was not possible due to insufficient quality of the slides. The median time for the telemedicine diagnosis was 14 min 30 sec.

  3. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    SciTech Connect

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal.

  4. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    SciTech Connect

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete.

  5. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    SciTech Connect

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE`s satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson.

  6. Stages of Change Profiles among Adults Experiencing Hearing Difficulties Who Have Not Taken Any Action: A Cross-Sectional Study

    PubMed Central

    Manchaiah, Vinaya

    2015-01-01

    The aim of the current study was to test the hypothesis that adults experiencing hearing difficulties who are aware of their difficulties but have not taken any action would fall under contemplation and preparation stages based on the transtheoretical stages-of-change model. The study employed a cross-sectional design. The study was conducted in United Kingdom and 90 participants completed University of Rhode Island Change Assessment (URICA) scale as well as measures of self-reported hearing disability, self-reported anxiety and depression, self-reported hearing disability acceptance, and provided additional demographic details online. As predicted, the results indicate that a high percentage of participants (over 90%) were in the contemplation and preparation stages. No statistically significant differences were observed among groups of stage with highest URICA scores and factors such as: years since hearing disability, self-reported hearing disability, self-reported anxiety and depression, and self-reported hearing disability acceptance. Cluster analysis identified three stages-of-change clusters, which were named as: decision making (53% of sample), participation (28% of sample), and disinterest (19% of sample). Study results support the stages-of-change model. In addition, implications of the current study and areas for future research are discussed. PMID:26042790

  7. Stages of Change Profiles among Adults Experiencing Hearing Difficulties Who Have Not Taken Any Action: A Cross-Sectional Study.

    PubMed

    Manchaiah, Vinaya; Rönnberg, Jerker; Andersson, Gerhard; Lunner, Thomas

    2015-01-01

    The aim of the current study was to test the hypothesis that adults experiencing hearing difficulties who are aware of their difficulties but have not taken any action would fall under contemplation and preparation stages based on the transtheoretical stages-of-change model. The study employed a cross-sectional design. The study was conducted in United Kingdom and 90 participants completed University of Rhode Island Change Assessment (URICA) scale as well as measures of self-reported hearing disability, self-reported anxiety and depression, self-reported hearing disability acceptance, and provided additional demographic details online. As predicted, the results indicate that a high percentage of participants (over 90%) were in the contemplation and preparation stages. No statistically significant differences were observed among groups of stage with highest URICA scores and factors such as: years since hearing disability, self-reported hearing disability, self-reported anxiety and depression, and self-reported hearing disability acceptance. Cluster analysis identified three stages-of-change clusters, which were named as: decision making (53% of sample), participation (28% of sample), and disinterest (19% of sample). Study results support the stages-of-change model. In addition, implications of the current study and areas for future research are discussed. PMID:26042790

  8. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada, Rev. No.: 0

    SciTech Connect

    Rick Findlay

    2006-09-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation.

  9. Financial and tax risks at implementation of "Chayanda- Lensk" section of "Sila Sibiri" gas transportation system construction project

    NASA Astrophysics Data System (ADS)

    Sharf, I. V.; Chukhareva, N. V.; Kuznetsova, L. P.

    2014-08-01

    High social and economic importance of large-scale projects on gasification of East Siberian regions of Russia and diversifying gas exports poses the problem of complex risk analysis of the project. This article discusses the various types of risks that could significantly affect the timing of the implementation and effectiveness of the project for the construction of the first line of "Sila Sibiri", the "Chayanda-Lensk" section. Special attention is paid to financial and tax aspects of the project. Graphically presented analysis of the dynamics of financial indicators reflect certain periods of effectiveness in implementing the project. Authors also discuss the possible causes and consequences of risks.

  10. The Impact of a Dual-Project Action Learning Program: A Case of a Large IT Manufacturing Company in South Korea

    ERIC Educational Resources Information Center

    Yoon, Hyung Joon; Cho, Yonjoo; Bong, Hyeon-Cheol

    2012-01-01

    The primary purpose of this article is to evaluate the impact of a dual-project action learning program (DPALP) conducted in South Korea. A dual-project program requires each participant to carry out both team and individual projects. Cho and Egan's [2009. Action learning research: A systematic review and conceptual framework. "Human Resource…

  11. Co-In-Sb Ternary System (I): Isothermal Sections and Liquidus Projection

    NASA Astrophysics Data System (ADS)

    Tseng, Ssu-ming; Chen, Sinn-wen; Chang, Jui-shen; Tang, Yinglu; Snyder, G. Jeffrey

    2015-12-01

    The Co-In-Sb ternary system has thermoelectric application interests. Co-In-Sb ternary alloys are prepared in this study. Their equilibrium phases at 1123.15 K and 923.15 K (850 °C and 650 °C) as well as their primary solidification phases and univariant reaction temperatures are determined. The isothermal sections at 1123.15 K and 923.15 K (850 °C and 650 °C) and the liquidus projection of the Co-In-Sb ternary system are determined based on the ternary experimental results, the phase diagrams of its three constituent binary systems, and the limited phase equilibria literature. No ternary compounds are found. The phase relationships at both 1123.15 K and 923.15 K (850 °C and 650 °C) are the same. There are five phases, seven two-phase regions, and three tie-triangles which are Co-CoSb-liquid, CoSb-CoSb2-liquid, and CoSb2-CoSb3-liquid. In the liquidus projection, there are nine primary solidification phase regions, Co, CoSb, CoSb2, CoSb3, Sb, InSb, In, CoIn2, and CoIn3. There are seven invariant reactions which are two Class I, four Class II, and one Class III.

  12. Track Reconstruction in a Time Projection Chamber Designed to Make High Precision Fission Cross Section Measurements

    NASA Astrophysics Data System (ADS)

    Sharma, Sarvagya

    2010-10-01

    The TPC (Time Projection Chamber), being constructed by the NIFFTE (Neutron Induced Fission Fragment Tracking Experiment) collaboration will be used for high-precision fission cross-section measurements. These measurements will aid in the design of future generations of nuclear power plants. The NIFFTE track reconstruction effort has developed two approaches consisting of a variety of statistical estimators. The first, consists of traditional cluster and hit finding algorithms that are performed on 2D planes. A least squares is performed on the hits to produce a track in the TPC. The alternate approach uses the Hough Transform, a brute force attempt at finding tracks that isolates features in the TPC volume through data binning. To determine fit parameters, a Kalman Filter has been implemented that accounts for multiple scattering and kinks in the track. Comparing simulated and reconstructed tracks have shown the validity of these methods. The software uses open source packages to ensure re-usability for future TPC projects. In my talk, I will describe these methods in detail.

  13. Mirror symmetric optics design for charge-stripping section in Rare Isotope Science Project

    NASA Astrophysics Data System (ADS)

    Kim, Hye-Jin; Kim, Hyung-Jin; Jeon, Dong-O.; Hwang, Ji-Gwang; Kim, Eun-San

    2013-12-01

    The main aim of the Rare Isotope Science Project is to construct a high power heavy-ion accelerator based on the superconducting linear accelerator (SCL). The heavy ion accelerator is a key research facility that will allow ground-breaking research into numerous facets of basic science, such as nuclear physics, astrophysics, atomic physics, life science, medicine and material science. The machine will provide a beam power of 400 kW with a 238U79+ beam of 8 pμA and 200 MeV/u. One of the critical components in the SCL is the charge stripper between the two segments, SCL1 and SCL2, of the SCL. The charge stripper removes electrons from the ion beams to enhance the acceleration efficiency in the subsequent SCL2. To improve the efficiency of acceleration and power in SCL2, the optimal energy of stripped ions in a solid carbon foil stripper was estimated using the code LISE++. The thickness of the solid carbon foil was 300 μg/m2. The charge stripping efficiency of the solid carbon stripper in the present study was approximately 87%. For charge selection from the ions produced by the solid carbon stripper, a dispersive section is needed down-stream of the foil. The designed optics for the dispersive section is based on the mirror-symmetric optics to minimize the effect of high-order aberrations.

  14. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-10

    ... Transmission Line Projects under section 1222 of EPAct (73 FR 70636 and 70638 respectively). Southwestern... Western's participation in the upgrade of existing transmission facilities owned by either PMA, or the construction of new transmission lines in the states in which either PMA operates. DATES: Project...

  15. Nurse-led action research project for expanding nurses’ role in patient education in Iran: Process, structure, and outcomes

    PubMed Central

    Khorasani, Parvaneh; Rassouli, Maryam; Parvizy, Soroor; Zagheri-Tafreshi, Mansoureh; Nasr-Esfahani, Mahmood

    2015-01-01

    Background: Patient education is among the lowest met need of patients in Iran; therefore, expansion of that role can result in greater professional accountability. This study aimed to explain the practical science of the process, structure, and outcomes of a nurse-led action research project to expand the nurses’ role in patient education in Iran. Materials and Methods: This study was part of a participatory action research. Daily communications and monthly joint meetings were held from January 2012 to February 2014 for planning and management. These were based on the research protocol, and the conceptual framework included the Mobilizing for Action through Planning and Partnerships process by means of Leadership for Change skills. Data were produced and gathered through participant observations. Administrative data included project records, official documents, artifacts, news, and reports, which were analyzed through qualitative content analysis. Results: A participatory project was established with three groups of participants organized from both academic and clinical fields. These consisted of a “core research support team,” “two steering committees,” and community representatives of clients and professionals as “feedback groups.” A seven-stage process, named the “Nurse Educators: Al-Zahra Role Expansion Action Research” (NEAREAR) process, resulted from the project, in which strategic issues were gradually developed and implemented through 32 action plans and quality improvement cycles of action research. Audits and supervision evaluations showed meaningful changes in capacity building components. Conclusions: A nurse-led ad hoc structure with academic–clinical partnerships and strategic management process was suggested as a possible practical model for expanding nurses’ educational role in similar contexts. Implications and practical science introduced in this action research could also be applicable for top managers and health system

  16. 2012 Groundwater Monitoring Report Project Shoal Area Subsurface Corrective Action Unit 447

    SciTech Connect

    2013-03-01

    The Project Shoal Area (PSA) in Nevada was the site of a 12-kiloton underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. Analytical results from the 2012 monitoring are consistent with those of the previous years, with tritium detected only in well HC-4. The tritium concentration in groundwater from well HC-4 remains far below the U.S. Environmental Protection Agency-established maximum contaminant level of 20,000 picocuries per liter. Concentrations of total uranium and gross alpha were also detected during this monitoring period, with uranium accounting for nearly all the gross alpha activity. The total uranium concentrations obtained from this monitoring period were consistent with previous results and reflect a slightly elevated natural uranium concentration, consistent with the mineralized geologic terrain. Isotopic ratios of uranium also indicate a natural source of uranium in groundwater, as opposed to a nuclear-test-related source. Water level trends obtained from the 2012 water level data were consistent with those of previous years. The corrective action strategy for the PSA is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the current monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. While water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an

  17. 76 FR 18757 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ...The EPA is hereby granting a project waiver of the Buy American requirements of ARRA Section 1605 under the authority of Section 1605(b)(2) [manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality] to the Bayonne Municipal Utilities Authority, New Jersey (Authority), for the purchase of a foreign manufactured wind......

  18. 75 FR 5564 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ...The United States Department of Agriculture (USDA) grants a project waiver of the Buy American Requirements of ARRA Section 1605 under the authority of Section 1605(b)(2) [manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality] to the Plymouth Village Water & Sewer District, New Hampshire (``District'') for the......

  19. 75 FR 67718 - Notice of a Project Waiver of Section 1605: (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ...The EPA is hereby granting a project waiver of the Buy American requirements of ARRA Section 1605 under the authority of Section 1605(b)(2) (manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality) to the Town of Windsor, a California Drinking Water State Revolving Fund (DWSRF)/ARRA loan recipient, for the......

  20. 76 FR 18218 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... will be used as part of Salt Lake City's Water Reclamation Facility's capacity upgrades. Section 1605... Reinvestment Act of 2009 (ARRA) to Salt Lake City, UT AGENCY: Environmental Protection Agency (EPA). ACTION... satisfactory quality to Salt Lake City, UT for three vertical linear motion mixers to be installed in the...

  1. 75 FR 6387 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... Troy, Vermont (``Town'') for the purchase of foreign manufactured butterfly valves and actuators for an... that there are currently no domestic manufactured butterfly valves and actuators available to meet its... exception to Section 1605 of ARRA. This action permits the purchase of foreign manufactured butterfly...

  2. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA (the limitations on bonus payments)? 30.10 Section 30.10 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE GOVERNANCE §...

  3. Weldon Spring Site environmental report for calendar year 1993. Weldon Springs Site Remedial Action Project

    SciTech Connect

    Not Available

    1994-05-01

    This Site Environmental Report for Calendar Year 1993 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels, and to summarize trends and/or changes in contaminant concentrations from environmental monitoring program. In 1993, the maximum committed dose to a hypothetical individual at the chemical plant site perimeter was 0.03 mrem (0.0003 mSv). The maximum committed dose to a hypothetical individual at the boundary of the Weldon Spring Quarry was 1.9 mrem (0.019 mSv). These scenarios assume an individual walking along the perimeter of the site-once a day at the chemical plant/raffinate pits and twice a day at the quarry-250 days per year. This hypothetical individual also consumes fish, sediment, and water from lakes and other bodies of water in the area. The collective dose, based on an effected population of 112,000 was 0.12 person-rem (0.0012 person-Sv). This calculation is based on recreational use of the August A. Busch Memorial Conservation Area and the Missouri Department of Conservation recreational trail (the Katy Trail) near the quarry. These estimates are below the U.S. Department of Energy requirement of 100 mrem (I mSv) annual committed effective dose equivalent for all exposure pathways. Results from air monitoring for the National Emission Standards for Hazardous Air Pollutants (NESHAPs) program indicated that the estimated dose was 0.38 mrem, which is below the U.S. Environmental Protection Agency (EPA) standard of 10 mrem per year.

  4. "What Happened to Our Sense of Justice?" Tracing Agency and Critical Engagement in a Youth Participatory Action Research Project

    ERIC Educational Resources Information Center

    Giraldo-García, Regina J.; Galletta, Anne

    2015-01-01

    Tracing the nature of critical engagement and agency among youth in a participatory action research (PAR) collective, the study attends to the manner in which critical engagement and agency developed over time for the youth researchers. The focus of the project was to conduct a survey among ninth grade students concerning their early high school…

  5. A Synthesis and Application Teaching Approach for Group Projects in an Undergraduate Business Course: An Action Research Study

    ERIC Educational Resources Information Center

    Green, Laurena E.

    2009-01-01

    Scholars proposed it would be possible to enhance group effectiveness and functioning if people could develop a better appreciation of the processes surrounding group development (M. K. Smith, 2005). The action research study explored the facilitation of a synthesis and application teaching approach for group projects in the practice of two…

  6. Democratic Deliberations in the Finnish Elementary Classroom: The Dilemmas of Deliberations and the Teacher's Role in an Action Research Project

    ERIC Educational Resources Information Center

    Tammi, Tuure

    2013-01-01

    Finnish youth are found to be, despite their broad knowledge, uninterested in politics and in societal participation. As a remedy, international studies suggest enabling democratic experiences in schools. This article discusses an action research project aimed at developing deliberation-based democratic practice in an elementary classroom. Results…

  7. An Action Research Project to Determine the Utility of Bully Prevention in Positive Behavior Support for Elementary School Bullying Prevention

    ERIC Educational Resources Information Center

    Goodman-Scott, Emily; Doyle, Beth; Brott, Pamelia

    2014-01-01

    A trio of researchers presents a case study from a practical, participatory action research project to demonstrate how one school district implemented a school-wide bullying prevention initiative for all elementary schools based on Bully Prevention in Positive Behavior Support (BP-PBS). The purpose of this manuscript is to discuss the process of…

  8. Making Space for Democracy through Assessment and Feedback in Higher Education: Thoughts from an Action Research Project in Education Studies

    ERIC Educational Resources Information Center

    McDonnell, Jane; Curtis, Will

    2014-01-01

    This paper reports on an action research project into the development of a "democratic feedback model" with students on an education studies programme at a post-1992 university in the UK. Building on work that has explored the dialogic dimensions of assessment and feedback, the research explored the potential for more…

  9. 77 FR 66215 - Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York Correction In notice document 2012-26799, appearing on page 65929 in the...

  10. Collaborative Action Research as a Tool for Generating Formative Feedback on Teachers' Classroom Assessment Practice: The KREST Project

    ERIC Educational Resources Information Center

    Harrison, Christine

    2013-01-01

    This paper sets out to explore science teachers' classroom assessment practices and outlines some of the tensions and synergies in changing assessment practices. It describes episodes from a collaborative action research project with science teachers designed to support the strengthening of classroom assessment practices--the King's…

  11. Collaborative Action Research and Project Work: Promising Practices for Developing Collaborative Inquiry among Early Childhood Preservice Teachers

    ERIC Educational Resources Information Center

    Moran, Mary Jane

    2007-01-01

    Excerpts from case studies of two preservice teaching teams exemplify a new approach for merging research and practice within an introductory early childhood methods course. Through participation in cycles of collaborative action research focused on the joint task of implementing long-term projects, preservice teachers evidenced change in the ways…

  12. From Idea to Action: Promoting Responsible Management Education through a Semester-Long Academic Integrity Learning Project

    ERIC Educational Resources Information Center

    Lavine, Marc H.; Roussin, Christopher J.

    2012-01-01

    The authors describe a semester-long action-learning project where undergraduate or graduate management students learn about ethics, responsibility, and organizational behavior by examining the policy of their college or university that addresses academic integrity. Working in teams, students adopt a stakeholder management approach as they make…

  13. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    SciTech Connect

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state`s 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs.

  14. A Life in the Community: An Action Research Project Promoting Citizenship for People with High Support Needs

    ERIC Educational Resources Information Center

    Swift, Paul; Mattingly, Molly

    2009-01-01

    Life in the Community is an action research project with three objectives: (1) To work with four organisations from the third sector to improve the daytime opportunities for up to 40 people with higher support needs and help them to be more included in the life of a community; (2) To develop the capacity of organisations in the not-for-profit…

  15. 24 CFR 402.7 - Refusal to consider an owner's request for a Section 8 contract renewal because of actions or...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER SECTION 524 OF MAHRA § 402.7... owner or affiliate. (a) Determination of eligibility. Notwithstanding 2 CFR part 2424, HUD may elect to...: (1) The owner or an affiliate is debarred or suspended under part 2 CFR part 2424; (2) HUD...

  16. 24 CFR 402.7 - Refusal to consider an owner's request for a Section 8 contract renewal because of actions or...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER SECTION 524 OF MAHRA § 402.7... owner or affiliate. (a) Determination of eligibility. Notwithstanding 2 CFR part 2424, HUD may elect to...: (1) The owner or an affiliate is debarred or suspended under part 2 CFR part 2424; (2) HUD...

  17. 24 CFR 402.7 - Refusal to consider an owner's request for a Section 8 contract renewal because of actions or...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER SECTION 524 OF MAHRA § 402.7... owner or affiliate. (a) Determination of eligibility. Notwithstanding 2 CFR part 2424, HUD may elect to...: (1) The owner or an affiliate is debarred or suspended under part 2 CFR part 2424; (2) HUD...

  18. 24 CFR 402.7 - Refusal to consider an owner's request for a Section 8 contract renewal because of actions or...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER SECTION 524 OF MAHRA § 402.7... owner or affiliate. (a) Determination of eligibility. Notwithstanding 2 CFR part 2424, HUD may elect to...: (1) The owner or an affiliate is debarred or suspended under part 2 CFR part 2424; (2) HUD...

  19. 24 CFR 402.7 - Refusal to consider an owner's request for a Section 8 contract renewal because of actions or...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... HOUSING AND URBAN DEVELOPMENT SECTION 8 PROJECT-BASED CONTRACT RENEWAL UNDER SECTION 524 OF MAHRA § 402.7... owner or affiliate. (a) Determination of eligibility. Notwithstanding 2 CFR part 2424, HUD may elect to...: (1) The owner or an affiliate is debarred or suspended under part 2 CFR part 2424; (2) HUD...

  20. Quality Assurance Program Plan for the radiological survey activities program --- Uranium Mill Tailings Remedial Action Project

    SciTech Connect

    Knott, R.R.; Little, C.A.

    1991-08-01

    The Pollutant Assessments Group (PAG) at the Grand Junction Office (GJO), Colorado, of Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude these sites from UMTRAP based on whether the on-site residual radioactive material (if any) originated from the former mill sites, and radiation levels on-site are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the Quality Assurance Plan (QAP) for the PAG in conducting all activities related to UMTRAP. All quality assurance provisions given by the DOE, DOE/UMTRA and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the PAG/UMTRA QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups. 11 refs., 6 figs., 3 tabs.

  1. Weldon Spring Site Remedial Action Project quarterly environmental data summary for second quarter 1998

    SciTech Connect

    1998-08-11

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the second quarter of 1998 is enclosed. The data presented constitutes the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the database during the second quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the database and KPA data are not merged into the regular database. All data received and verified during the second quarter were within a permissible range of variability, except for those listed. Above normal occurrences are cited for groundwater, air, and NPDES data. There were no above normal occurrences for springs or surface water. The attached tables present the most recent data for air and the data merged into the database during the second quarter 1998 for groundwater, NPDES, surface water, and springs.

  2. Spatial dynamics of action potentials estimated by dendritic Ca(2+) signals in insect projection neurons.

    PubMed

    Ogawa, Hiroto; Mitani, Ruriko

    2015-11-13

    The spatial dynamics of action potentials, including their propagation and the location of spike initiation zone (SIZ), are crucial for the computation of a single neuron. Compared with mammalian central neurons, the spike dynamics of invertebrate neurons remain relatively unknown. Thus, we examined the spike dynamics based on single spike-induced Ca(2+) signals in the dendrites of cricket mechanosensory projection neurons, known as giant interneurons (GIs). The Ca(2+) transients induced by a synaptically evoked single spike were larger than those induced by an antidromic spike, whereas subthreshold synaptic potentials caused no elevation of Ca(2+). These results indicate that synaptic activity enhances the dendritic Ca(2+) influx through voltage-gated Ca(2+) channels. Stimulation of the presynaptic sensory afferents ipsilateral to the recording site evoked a dendritic spike with higher amplitude than contralateral stimulation, thereby suggesting that alteration of the spike waveform resulted in synaptic enhancement of the dendritic Ca(2+) transients. The SIZ estimated from the spatial distribution of the difference in the Ca(2+) amplitude was distributed throughout the right and left dendritic branches across the primary neurite connecting them in GIs. PMID:26456645

  3. Searching for New Directions: Developing MA Action Research Project as a Tool for Teaching

    ERIC Educational Resources Information Center

    Lee, Young Ah; Wang, Ye

    2012-01-01

    Action research has been recognized as a useful professional development tool for teaching, but for inservice teachers, conducting action research can be challenging. Their learning about action research can be influenced by social situations--whether in an MA (Master of Arts) program or other professional development. The purpose of this…

  4. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Q-10: What actions are necessary for... right to a bonus payment, see 26 CFR 1.409A-1(b)(i). In addition, the bonus payment must be made in....10 Section 30.10 Money and Finance: Treasury Office of the Secretary of the Treasury TARP...

  5. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Q-10: What actions are necessary for... right to a bonus payment, see 26 CFR 1.409A-1(b)(i). In addition, the bonus payment must be made in....10 Section 30.10 Money and Finance: Treasury Office of the Secretary of the Treasury TARP...

  6. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Q-10: What actions are necessary for... right to a bonus payment, see 26 CFR 1.409A-1(b)(i). In addition, the bonus payment must be made in....10 Section 30.10 Money and Finance: Treasury Office of the Secretary of the Treasury TARP...

  7. 31 CFR 30.10 - Q-10: What actions are necessary for a TARP recipient to comply with section 111(b)(3)(D) of EESA...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... right to a bonus payment, see 26 CFR 1.409A-1(b)(i). In addition, the bonus payment must be made in... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Q-10: What actions are necessary for....10 Section 30.10 Money and Finance: Treasury Office of the Secretary of the Treasury TARP...

  8. Give Water a Hand. Community Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation within a community, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  9. Give Water a Hand. School Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation at a school site, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  10. Give Water a Hand. Home Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water and water conservation within the home while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  11. Radiation Protection Considerations at USACE Formerly Utilized Sites Remedial Action Program (FUSRAP) Projects

    SciTech Connect

    Brown, S.H.

    2008-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was initially authorized by Congress in 1974. FUSRAP was enacted to address residual radioactive contamination associated with numerous sites across the U.S. at which radioactive material (primarily Uranium ores and related milling products) had been processed in support of the nation's nuclear weapons program dating back to the Manhattan Project and the period immediately following World War II. In October 1997, Congress transferred the management of this program from the Department of Energy to the United States Corp of Engineers. Through this program, the Corps addresses the environmental remediation of certain sites once used by DOE's predecessor agencies, the Manhattan Engineer District and the Atomic Energy Commission. The waste at FUSRAP sites consists mainly of low levels of uranium, thorium and radium, along with some mixed wastes. Upon completion of remedial activities, these sites are transferred to DOE for long-term stewardship activities. This paper presents and contrasts the radiological conditions and recent monitoring results associated with five large ongoing FUSRAP projects including Maywood, N.J.; the Linde site near Buffalo, N.Y.; Colonie in Albany N.Y. and the St Louis, Mo. airport and downtown sites. The radiological characteristics of soil and debris at each site and respective regulatory clean up criteria is presented and contrasted. Some differences are discussed in the radiological characteristics of material at some sites that result in variations in radiation protection monitoring programs. Additionally, summary data for typical personnel radiation exposure monitoring results are presented. In summary: 1. The FUSRAP projects for which data and observations are reported in this paper are considered typical of the radiological nature of FUSRAP sites in general. 2. These sites are characterized by naturally occurring uranium and thorium series radionuclides in soil and debris, at

  12. Liquidus Projection and Isothermal Section of the Ag-In-Zn Ternary System

    NASA Astrophysics Data System (ADS)

    Chang, Jui-Shen; Chen, Sinn-wen

    2015-04-01

    This study experimentally determines the liquidus projection and phase equilibria isothermal section at 773.2 K (500°C) of the Ag-In-Zn ternary system. There are ten primary solidification phases of the Ag-In-Zn ternary system. In addition to the (Ag) (In) and (Zn) phases, there are seven binary compounds: β-(Ag3In), ζ-(Ag3In), γ-(Ag9In4), AgIn2, β-(AgZn), γ-(Ag5Zn8), and ɛ-(AgZn3). No ternary compounds were found. Among all these phases, the γ-(Ag9In4) primary solidification phase has the largest compositional regime. Five invariant reactions, two Class I reactions, two Class II reactions, and one Class III reaction, are determined by thermal analysis in this study. The reactions with the lowest and highest reaction temperatures are Liquid = (In) + AgIn2 + γ-(Ag5Zn8) at 413.5 K (140.3°C) and Liquid + (Ag) + β-(AgZn) = ζ-(Ag3In) at 964.9 K (691.7°C), respectively. In the isothermal section at 773.2 K, there are six tie-triangles: (Ag) + ζ-(Ag3In) + β-(AgZn), ζ-(Ag3In) + γ-(Ag9In4) + β-(AgZn), ζ-(Ag3In) + γ-(Ag9In4) + Liquid, γ-(Ag9In4) + β-(AgZn) + Liquid, β-(AgZn) + γ -(Ag5Zn8) + Liquid, and γ-(Ag5Zn8) + ɛ-(AgZn3) + Liquid.

  13. 76 FR 18548 - Clean Water Act Section 303(d): Final Agency Action on Three Total Maximum Daily Loads (TMDLs) in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... Louisiana AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... an inspection. FOR FURTHER INFORMATION CONTACT: Diane Smith, Environmental Protection...

  14. Antenatal screening for haemoglobinopathies in primary care: a whole system participatory action research project

    PubMed Central

    Thomas, Paul; Oni, Lola; Alli, Mabel; St Hilaire, Judith; Smith, Alma; Leavey, Conan; Banarsee, Ricky

    2005-01-01

    Background The usual system for antenatal screening for haemoglobinopathies permits termination only late in the second trimester of pregnancy. Aim To evaluate a system where pregnant women are screened in general practice, and to develop a model of care pathway or whole system research able to bring into view unexpected effects of health service innovation. Design of study A whole system participatory action research approach was used. Six purposefully chosen general practices screened women who attended with a new pregnancy. Data of gestational age of screening were compared with two control groups. Qualitative data were gathered through workshops, interviews and feedback to the project steering group. At facilitated annual workshops participants from all parts of the care pathway produced a consensus about the meaning of the data as a whole. Setting Six general practices in north London. Method A whole system participatory action research approach allowed stakeholders from throughout the care pathway to pilot the innovation and reflect on the meaning and significance of quantitative and qualitative data. Results The gestational age of screening in general practice was 4.1 weeks earlier (95% confidence interval (CI) = 3.41 to 4.68) than in hospital clinics (P<0.001), and 2.9 weeks earlier (95% CI = 2.07 to 3.65) than in community midwife clinics (P<0.001). However, only 35% of pregnant women in the study were screened in the practices. Changes required throughout the whole care pathway make wider implementation more difficult than at first realised. The cost within general practice is greater than initially appreciated owing to a perceived need to provide counselling about other issues at the same time. Practitioners considered that other ways of early screening should be explored, including preconceptual screening. The research approach was able to bring into view unexpected effects of the innovation, but health workers were unfamiliar with the participatory

  15. 42 CFR 137.325 - What does a Self-Governance Tribe do if it wants to perform a construction project under section...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... perform a construction project under section 509 of the Act ? 137.325 Section 137.325 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.325 What does a Self-Governance Tribe do if it wants to perform a construction project under section 509 of the Act ? (a) A...

  16. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  17. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  18. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  19. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  20. 40 CFR 52.34 - Action on petitions submitted under section 126 relating to emissions of nitrogen oxides.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section 126 relating to emissions of nitrogen oxides. 52.34 Section 52.34 Protection of Environment... of nitrogen oxides. (a) Definitions. For purposes of this section, the following definitions apply... of nitrogen. (6) OTAG means the Ozone Transport Assessment Group (active 1995-1997), a national...

  1. 78 FR 64593 - Notice of Final Federal Agency Actions on US 26: MP 49.20-MP 57.45 Project: Clackamas County, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ...This notice announces final environmental actions taken by the FHWA, USACE, USFS, USF&WS, NMFS and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, US 26: MP 49.20-MP 57.45. This action grants approval for the...

  2. What Does It Mean to Be a Friendly Outsider? Critical Reflection on Finding a Role as an Action Researcher with Communities Developing Renewable Energy Projects

    ERIC Educational Resources Information Center

    Rogers, Jennifer; Convery, Ian; Simmons, Eunice; Weatherall, Andrew

    2012-01-01

    This paper is a reflective account exploring the value of using action research in a relatively new context in the United Kingdom; the development of community renewable-energy projects. There is a strong rationale for using action research in this setting due to the synergies between the principles and practice of action research and localised…

  3. Great Plains gasification project, Mercer County, North Dakota; water assessment report section 13(c)

    SciTech Connect

    Not Available

    1980-12-01

    This report was prepared under the provisions of paragraph (c) of Sect. 13 of the Federal Nonnuclear Energy Research and Development Act of 1974. It assesses (1) the availability of adequate water supplies to meet the water requirement of the project, supporting activities and other development induced by the project and (2) the changes in the water resources that will result from the project.

  4. ACTION. Annual Report 1978.

    ERIC Educational Resources Information Center

    ACTION, Washington, DC.

    In this report are described projects and activities undertaken by ACTION's volunteer programs in 1978. The introduction notes a continued growth in programs and comments on new developments. Older American Volunteer Programs are discussed in the next section, specifically the Retired Senior Volunteer Program, Foster Grandparent Program, and…

  5. Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the ..Section..1603 Treasury Grant Program

    SciTech Connect

    Steinberg, D.; Porro, G.; Goldberg, M.

    2012-04-01

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the Section 1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the Section 1603 grant program.

  6. 75 FR 27808 - Section 8 Housing Choice Voucher Program-Demonstration Project of Small Area Fair Market Rents in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ...Section 8(c)(1) of the United States Housing Act of 1937 (USHA) requires the Secretary to publish FMRs periodically, but not less than annually, adjusted to be effective on October 1 of each year. The primary uses of FMRs are to determine payment standard amounts for the Housing Choice Voucher (HCV) program, to determine initial renewal rents for some expiring project-based Section 8......

  7. 76 FR 2683 - Notice of a Project Waiver of Section 1605: (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ...The EPA is hereby granting a project waiver of the Buy American requirements of ARRA Section 1605(a) under the authority of Section 1605(b)(2) (manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality) to the Inland Empire Utilities Agency (IEUA), a Clean Water State Revolving Fund (CWSRF)/ARRA loan recipient, for......

  8. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... notice announces actions taken by the FHWA and the USACE that are final within the meaning of 23 U.S.C... given that the USACE has taken final agency actions within the meaning of 23 U.S.C. Sec. 139(l)(1)...

  9. 75 FR 69889 - Extension of Deadline for Action on the Second Section 126 Petition From New Jersey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... NAAQS on June 2, 2010 (75 FR 35520). Specifically, EPA established the new 1-hour SO 2 NAAQS at a level... and the ] current deadline for a response to that petition is January 12, 2011 (75 FR 39633). II... ``significant regulatory action'' under the terms of Executive Order (EO) 12866 (58 FR 51735, October 4,...

  10. Colorado economic impact study on the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    SciTech Connect

    Not Available

    1993-11-12

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1993. To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are: Direct employment was estimated at 894 workers; An estimated 89 percent of all direct employment was local; Secondary employment resulting from remedial action at the active Colorado UMTRA Project sites and the Grand Junction vicinity property program is estimated at 546 workers. Total employment (direct and secondary) is estimated at 1440 workers for the period of study (July 1, 1992, to June 30, 1993). An estimated $24.1 million was paid in wages to UMTRA workers in Colorado during FY1993; Direct and secondary wage earnings were estimated at $39.9 million; Income tax payments to the state of Colorado were estimated at $843,400 during FY1993; The gross economic impact of UMTRA Project activities in the state of Colorado is estimated at $70 million during the 1-year study period; and the net economic benefit to the state of Colorado was estimated at $57.5 million, or $5.90 per dollar of funding provided by Colorado. This figure includes both direct and secondary benefits but does not include the impact of alternative uses of the state funding.

  11. Exploring teachers' beliefs and knowledge about scientific inquiry and the nature of science: A collaborative action research project

    NASA Astrophysics Data System (ADS)

    Fazio, Xavier Eric

    Science curriculum reform goals espouse the need to foster and support the development of scientific literacy in students. Two critical goals of scientific literacy are students' engagement in, and developing more realistic conceptions about scientific inquiry (SI) and the nature of science (NOS). In order to promote the learning of these curriculum emphases, teachers themselves must possess beliefs and knowledge supportive of them. Collaborative action research is a viable form of curriculum and teacher development that can be used to support teachers in developing the requisite beliefs and knowledge that can promote these scientific literacy goals. This research study used a collective case study methodology to describe and interpret the views and actions of four teachers participating in a collaborative action research project. I explored the teachers' SI and NOS views throughout the project as they investigated ideas and theories, critically examined their current curricular practice, and implemented and reflected on these modified curricular practices. By the end of the research study, all participants had uniquely augmented their understanding of SI and NOS. The participants were better able to provide explanatory depth to some SI and NOS ideas; however, specific belief revision with respect to SI and NOS ideas was nominal. Furthermore, their idealized action research plans were not implemented to the extent that they were planned. Explanations for these findings include: impact of significant past educational experiences, prior understanding of SI and NOS, depth of content and pedagogical content knowledge of the discipline, and institutional and instructional constraints. Nonetheless, through participation in the collaborative action research process, the teachers developed professionally, personally, and socially. They identified many positive outcomes from participating in a collaborative action research project; however, they espoused constraints to

  12. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.

  13. YouthAccess to Alcohol: early findings from a community action project to reduce the supply of alcohol to teens.

    PubMed

    Clark, Sam

    2007-01-01

    The Youth Access to Alcohol (YATA) project was implemented in 2002 by the Alcohol Advisory Council of New Zealand (ALAC) in thirty communities in New Zealand, with the aim of reducing the harm experienced by young people as a result of alcohol misuse in New Zealand through reducing the supply of alcohol by adults to young people. The communities include a mix of rural and urban from both Islands in New Zealand. The project uses a community action approach, which has included setting up collaborative partnerships of key agencies, the delivery of key strategies, and multimedia awareness raising campaigns. The communities are encouraged to identify unique issues in their community regarding alcohol abuse and young people and to develop action plans incorporating a range of strategies that include tested strategies as well as innovative ideas. Communities are trained to implement several tools to monitor changes in their community over time. The study's limitations are noted and future needed research is suggested. PMID:18075928

  14. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    SciTech Connect

    Not Available

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work.

  15. Commonwealth of Pennsylvania Adult Education Section 353 Special Demonstration Projects. Project Abstracts for the Fiscal Year 1995-1996.

    ERIC Educational Resources Information Center

    Werner, Evelyn C., Comp.; Harmon, Cheryl M., Comp.

    This document presents abstracts for 30 projects that were conducted in Pennsylvania in fiscal year 1995-1996 with federal funds allotted to strengthen adult basic and literacy education through experimentation with new methods, programs, and techniques and professional development for personnel working in adult basic education programs. Among the…

  16. 75 FR 25244 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Lower Little Miami River Wastewater Treatment Plant. This is a project-specific waiver and only applies... Wastewater Treatment Plant that may otherwise be prohibited under Section 1605(a) of the ARRA. DATES... Little Miami River Wastewater Treatment Plant. Early in the design process, the County decided to use...

  17. Studying Pond Life with Primary-Age Children: The Project Approach in Action.

    ERIC Educational Resources Information Center

    Warner, Laverne; Morse, Pam

    2001-01-01

    Describes the development, implementation, and results of a pond life elementary student research project. Utilizing the pond life example, provides guidelines for children's research projects including the implementation of the K-W-L (know-want to know- learned) strategy with the children's reports/projects. Provides resources utilized in the…

  18. Differential invariants and operators of invariant differentiation of the projectable action of Lie groups

    NASA Astrophysics Data System (ADS)

    Goncharovskii, M. M.; Shirokov, I. V.

    2015-05-01

    We describe the relation between operators of invariant differentiation and invariant operators on orbits of Lie group actions. We propose a new effective method for finding differential invariants and operators of invariant differentiation and present examples.

  19. Interagency Dosimetry Project: Methods for Dosimetry Adjustment Based on Mode of Action

    EPA Science Inventory

    As the science of toxicology evolves, many laboratories are adding new testing protocols or assays in their programs directed at ascertaining mechanistic information on uptake and toxic action of chemicals. In response to the increasing complexity and comprehensiveness of these ...

  20. PREFACE TO SPECIAL SECTION: SOUTHERN OXIDANTS STUDY 1999 ATLANTA SUPERSITE PROJECT (SOS3)

    EPA Science Inventory

    The Atlanta Supersites Project consisted of a one-month intensive field program to compare advanced methods for measurement of PM2.5 mass, chemical composition, including single particle composition in real-time, and aerosol precursor species. The project was the first of EPA's ...

  1. Project CABE 1986-1987: O.E.A. Evaluation Section Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Bilingual Education.

    The report describes first-year activities of Project CABE (Content-Area Bilingual Education) which aims to improve instruction and increase parental involvement for limited-English-proficient Spanish-speaking students with handicapping conditions in grades 4 through 9. During its first year the project served 308 students attending 25 public…

  2. Mitigation and monitoring plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1992-06-01

    The U.S Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project. The UMTRA Project is the result of the Uranium Mill Tailings Radiation Control Act(UMTRA) which was passed in response to the public's concern over the potential public health hazards related to uranium mill tailings and associated contaminated material at abandoned or otherwise uncontrolled inactive processing sites throughout the United States. The Gunnison, Colorado abandoned uranium mill site is one of the sites slated for cleanup by the DOE under authority of UMTRA. The contaminated material at this site will be transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities will temporarily disturb 0.8 acre and permanently eliminate 5.1 acres of wetlands. This report describes the proposed mitigation plan for the 5.9 acres of impacted wetlands. In conjunction with the mitigation of the permanently impacted wetlands through the enhancement of wetland and adjacent riparian areas, impacts to wildlife as a result of this project will also be mitigated. However, wildlife mitigation is not the focus of this document and is covered in relevant BLM permits for this project. This plan proposes the enhancement of a 3:1 ratio of impacted wetlands in accordance with US Environmental Protection Agency guidelines, plus the enhancement of riparian areas for wildlife mitigation. Included in this mitigation plan is a monitoring plan to ensure that the proposed measures are working and being maintained.

  3. Using a Time Projection Chamber to Measure High Precision Neutron-Induced Fission Cross Sections

    SciTech Connect

    Manning, Brett

    2015-08-06

    2014 LANSCE run cycle data will provide a preliminary 239Pu(n,f) cross section and will quantify uncertainties: PID and Target/beam non-uniformities. Continued running during the 2015 LANSCE run cycle: Thin targets to see both fission fragments and 239Pu(n,f) cross section and fully quantified uncertainties

  4. Short-term incubation of bovine placentome sections as a tool to study xenobiotic mechanism of action.

    PubMed

    Wojciechowska, Anna; Młynarczuk, Jarosław; Kotwica, Jan

    2015-12-01

    Studies on the effects of various factors, including xenobiotics, on the maternal-fetal connections in the placenta are restricted by the lack of a simple and inexpensive research model. We used placentomes collected at a slaughterhouse to in vitro study the bovine sections contained integral maternal-fetal connections. The placentomes from cows (n=4/experiment, 120-150 days post coitum) were cut using a razor blade into 60-80 mg sections and incubated in either DMEM/Ham's F-12 or M-199 supplemented with FCS (2%, 5% or 10%), amniotic fluid (AF or inactive AF, 10% or 20%) or both. The sections (n=4/supplement) were incubated for 24 or 48 h in a water bath at 37.5°C in an atmosphere of 5% CO2 and 95% O2. The structure and secretory activity of placentome sections were maintained when incubated in DMEM/Ham's F-12 with 2% FCS and 10% AF. M-199 was less acidified than DMEM/Ham's F-12 during incubation, and thus, this medium was better able to maintain the integrity of the placenta and the secretion of estradiol, progesterone and oxytocin for 48 h. Moreover, we detected a decrease in the expression of placenta-specific 1 (PLAC1) mRNA (an indicator of trophoblast proliferation) and an increase in the levels of keratin 8 (KRT8; a marker of normal placental barrier function) and hypoxia induced factor 1α (HIF1α; a marker of hypoxia) mRNA. These results indicate the presence of adaptation and repair mechanisms and confirm the biological activity of the placentome sections. We propose the use of placentome sections as an in vitro model to study maternal-fetal connections in cows. PMID:26679165

  5. Perspectives from Ethiopia regarding U.S. military humanitarian assistance: how to build a better medical civil action project (MEDCAP).

    PubMed

    Miles, Shana; Malone, Joseph L

    2013-12-01

    Assuming that budgetary constraints continue over the next several years, the U.S. military's overseas medical activities including medical civic action projects (MEDCAPs) and humanitarian assistance projects could comprise an increasing proportion of the contributions of U.S. government (USG) to improving global health. We have identified several issues with MEDCAPs in Ethiopia since 2009 that resulted in delays or project cancellations. These were mostly related to lack of a plan to develop sustainable capacities. Although there are many obvious medical needs for civilian populations in Ethiopia, the provision of sustainable development assistance involving these Ethiopian populations on behalf of the USG is a complex undertaking involving coordination with many partners and coordination with several other USG agencies. Military medical professionals planning MEDCAPs and other cooperative global health projects would benefit from consultation and close coordination with U.S. Centers for Disease Control and Prevention (CDC) and U.S. Agency of International Development (USAID) experts who are involved in supporting medium- and long-term health projects in Ethiopia. The establishment of durable military medical academic relationships and involvement of overseas military medical research units could also help promote sustainable projects and build robust professional relationships in global health. PMID:24306018

  6. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    SciTech Connect

    Ewy, Ann; Hays, David

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  7. From Disenchantment to Dialogue and Action: The "Transforming Community" Project at Emory University

    ERIC Educational Resources Information Center

    Harris, Leslie M.; Usher, Jody

    2008-01-01

    In this article, the authors describe the "Transforming Community Project" (TCP) at Emory University. Emory University is large and dispersed: It comprises approximately 2,700 faculty, 6,400 staff members, and 12,300 students across nine academic divisions. The Transforming Community Project is oriented to both process and product. The process of…

  8. Uranium Mill Tailings Remedial Action Project, fiscal year 1995 annual report to stakeholders

    SciTech Connect

    1995-09-30

    In 1978, Congress authorized the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping projects. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about both phases of the UMTRA Project. DOE`s UMTRA Project is the world`s largest materials management project ever undertaken to reduce or eliminate risk to the general public from exposure to potentially hazardous and radioactive materials. With an estimated cost at completion of nearly $2 billion for both phases of the UMTRA Project, and with the responsibility for encapsulating and isolating almost one-fourth of all the uranium mill tailings generated across the entire US (more than 44 million cubic yards), the UMTRA Project and its people have achieved a long record of safely and effectively completing its mission. It continually enhances its national reputation through its diligent process and cost efficiency as well as its international recognition for its technological innovation.

  9. Statistics in Action: The Story of a Successful Service-Learning Project

    ERIC Educational Resources Information Center

    DeHart, Mary; Ham, Jim

    2011-01-01

    The purpose of this article is to share the stories of an Introductory Statistics service-learning project in which students from both New Jersey and Michigan design and conduct phone surveys that lead to publication in local newspapers; to discuss the pedagogical benefits and challenges of the project; and to provide information for those who…

  10. Engaging Young Adolescents in Social Action through Photovoice: The Youth Empowerment Strategies (YES!) Project

    ERIC Educational Resources Information Center

    Wilson, Nance; Dasho, Stefan; Martin, Anna C.; Wallerstein, Nina; Wang, Caroline C.; Minkler, Meredith

    2007-01-01

    The Youth Empowerment Strategies (YES!) project is an afterschool empowerment program and research project for underserved early adolescents. Central to YES! is an empowerment intervention that provides early adolescents with opportunities for civic engagement with other youth around issues of shared concern in their schools and neighborhoods.…

  11. Seeking to Improve African American Girls' Attitudes toward Science: A Participatory Action Research Project

    ERIC Educational Resources Information Center

    Buck, Gayle A.; Cook, Kristin L.; Quigley, Cassie F.; Prince, Pearl; Lucas, Yvonne

    2014-01-01

    In this participatory action research study, we answered the question, How can we improve attitudes toward science education of the African American girls at an elementary school? Girls in grades 3-6 completed the Modified Attitudes toward Science Inventory. A purposeful sample of 30 girls participated in several focus-group interviews throughout…

  12. Effects of a Long-Term Participatory Action Research Project on Science Teachers' Professional Development

    ERIC Educational Resources Information Center

    Eilks, Ingo; Markic, Silvija

    2011-01-01

    This paper describes the potential of long-term co-operation between science educators and science teachers concerning the teachers' continuous professional development, based on Participatory Action Research in science education. The discussion is based on a six-year case study observing a group of about ten German chemistry teachers by chemistry…

  13. The Northern New England Social Action Theater. Literacy Theater Staff Training Project: An Evaluation. Evaluation Report.

    ERIC Educational Resources Information Center

    Mackin, Kathleen J.; And Others

    A study examined the effectiveness and replicability of staff training programs provided by the Northern New England Social Action Theater (NNESAT), whose touring component travels around the country promoting the use of improvisational theater as a means of training all levels of literacy practitioners. Questionnaires were administered at 13…

  14. The Power of Words: A Crucial Conversation at the Launch of an Action Research Project

    ERIC Educational Resources Information Center

    Moen, Torill; Solvberg, Astrid M.

    2012-01-01

    Action research in schools implies that the researchers and the teachers should collaborate on solving problems and improving practice. One underlying premise when choosing, such an approach, is that the participants are interested in, and willing to participate in such a process. In this article, the authors explore how words and utterances…

  15. Invariants of projective actions and their application to recognition of fingerprints

    NASA Astrophysics Data System (ADS)

    Konovenko, Nadiia; Lychagin, Valentin

    2016-03-01

    We study the field of rational differential invariants of the left {PSL}2( {R}) -action on the homogeneous space { Diff(S}1)/{PSL}2( {R}) and use them to give an alternative discription of the shape space and fingerprints, introduced by Mumford and Sharon (Int J Comput Vis 70(1):55-75, 2006).

  16. Evaluation of a Multi-Case Participatory Action Research Project: The Case of SOLINSA

    ERIC Educational Resources Information Center

    Home, Robert; Rump, Niels

    2015-01-01

    Purpose: Scholars agree that evaluation of participatory action research is inherently valuable; however there have been few attempts at evaluating across methods and across interventions because the perceived success of a method is affected by context, researcher skills and the aims of the participants. This paper describes the systematic…

  17. Complementary Contributions of Striatal Projection Pathways to Action Initiation and Execution.

    PubMed

    Tecuapetla, Fatuel; Jin, Xin; Lima, Susana Q; Costa, Rui M

    2016-07-28

    The performance of an action relies on the initiation and execution of appropriate movement sequences. Two basal ganglia pathways have been classically hypothesized to regulate this process via opposing roles in movement facilitation and suppression. By using a series of state-dependent optogenetic manipulations, we dissected the contributions of each pathway and found that both the direct striatonigral pathway and the indirect striatopallidal pathway are necessary for smooth initiation and the execution of learned action sequences. Optogenetic inhibition or stimulation of each pathway before sequence initiation increased the latency for initiation: manipulations of the striatonigral pathway activity slowed action initiation, and those of the striatopallidal pathway aborted action initiation. The inhibition of each pathway after initiation also impaired ongoing execution. Furthermore, the subtle activation of striatonigral neurons sustained the performance of learned sequences, while striatopallidal manipulations aborted ongoing performance. These results suggest a supportive versus permissive model, where patterns of coordinated activity, rather than the relative amount of activity in these pathways, regulate movement initiation and execution. PMID:27453468

  18. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    SciTech Connect

    Bachrach, A.; Hoopes, J.; Morycz, D. ); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. , Inc., Washington, DC ); Rice, G. )

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

  19. Lessons from the Field: Participatory Action Research in a Family Research Project.

    ERIC Educational Resources Information Center

    Robison, Dorothy; Krauss, Marty Wyngaarden

    2003-01-01

    This paper describes development of a study that includes participatory action research, specifically the establishment of a family advisory committee. The study involved a survey of Massachusetts families of children with disabilities. Suggestions for establishing and integrating the committee into the research enterprise are offered, as are…

  20. Uranium Mill Tailings Remedial Action Project (UMTRAP), Rifle, Colorado: Phase 2, Construction drawings [Engineering Materials

    SciTech Connect

    Not Available

    1991-05-13

    This document consists of engineering drawings related to the remedial action of the Old Rifle Processing site, the New Rifle Processing site, and the Estes Gulch disposal site. This report is intended to accompany report DOE/UMTRA--050506 volume 3, appendix F.

  1. The development of peer reflective supervision amongst nurse educator colleagues: An action research project.

    PubMed

    Bulman, C; Forde-Johnson, C; Griffiths, A; Hallworth, S; Kerry, A; Khan, S; Mills, K; Sharp, P

    2016-10-01

    This action research study developed the use of peer reflective supervision (PRS) amongst eight nurse educators contributing to an undergraduate Adult Nursing programme at a UK University. During the academic year (2013-14), nurse educator co-researchers met for an introductory workshop and then met regularly in pairs to facilitate each other's reflection. This provided an opportunity for nurse educators to reflect on identified issues linked to their role with a facilitative peer. Educators met three additional times in a Reflexive Learning Group (RLG), to gather data on their use of PRS. Audio-recordings from the RLGs were transcribed and analysed using Norton's (2009) thematic analysis framework. Co-researchers iteratively validated the data and an external validation group critically viewed the evidence. Overall, seven themes were generated from the three research cycles. These were: PRS as a Valuable Affirming Experience; Time Issues; Facilitation- Support, Trust and Challenge; Developing a Flexible 'Toolbox'; To Write or Not to Write; Drawing on Literature; and Requirement for Action. Findings add new evidence regarding use of a flexible toolbox of resources to develop reflection and offer practical guidance on the development of PRS. Nurse educators often experienced similar concerns, and a facilitative supervision structure allowed co-researchers to positively explore these. Recognition of work pressures and requirement for time and space for reflection was highlighted, particularly regarding writing, and exploring the literature, to develop critical analysis of experiences. The importance of action as part of the reflective process was emphasised. Co-researchers reported positive personal change as well as the opportunity to highlight issues through their reflection for further action within the organisation. The study adds constructive evidence for the use of reflection to explore professional work, make sense of experiences and develop positive action

  2. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    SciTech Connect

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  3. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    SciTech Connect

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values that have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.

  4. 24 CFR 811.110 - Refunding of obligations issued to finance Section 8 projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Agencies qualified under 24 CFR part 883 to refund bonds which financed projects assisted pursuant to 24 CFR part 883, HUD requires compliance with the prohibition on duplicative fees contained in 24 CFR... Agency's performance in serving the targeted income eligible population. Savings may be used for...

  5. Wisconsin Title I Migrant Education. Section 143 Project: Development of an Item Bank. Summary Report.

    ERIC Educational Resources Information Center

    Brown, Frank N.; And Others

    The successful Wisconsin Title 1 project item bank offers a valid, flexible, and efficient means of providing migrant student tests in reading and mathematics tailored to instructor curricula. The item bank system consists of nine PASCAL computer programs which maintain, search, and select from approximately 1,000 test items stored on floppy disks…

  6. Bilingual Academic Computer and Technology Oriented Program: Project COM-TECH. Evaluation Section Report. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Plotkin, Donna

    Project COM-TECH offered bilingual individualized instruction, using an enrichment approach, to Spanish- and Haitian Creole-speaking students with varying levels of English and native language proficiency and academic preparation. The program provided supplementary instruction in English as a Second Language (ESL); Native Language Arts (NLA); and…

  7. The LXCat project: Electron scattering cross sections and swarm parameters for low temperature plasma modeling

    NASA Astrophysics Data System (ADS)

    Pancheshnyi, S.; Biagi, S.; Bordage, M. C.; Hagelaar, G. J. M.; Morgan, W. L.; Phelps, A. V.; Pitchford, L. C.

    2012-04-01

    LXCat is a dynamic, open-access, website for collecting, displaying, and downloading ELECtron SCATtering cross sections and swarm parameters (mobility, diffusion coefficient, reaction rates, etc.) required for modeling low temperature, non-equilibrium plasmas. Contributors set up individual databases, and the available databases, indicated by the contributor's chosen title, include mainly complete sets of electron-neutral scattering cross sections, although the option for introducing partial sets of cross sections exists. A database for measured swarm parameters is also part of LXCat, and this is a growing activity. On-line tools include options for browsing, plotting, and downloading cross section data. The electron energy distribution functions (edfs) in low temperature plasmas are in general non-Maxwellian, and LXCat provides an option for execution of an on-line Boltzmann equation solver to calculate the edf in homogeneous electric fields. Thus, the user can obtain electron transport and rate coefficients (averages over the edfs) in pure gases or gas mixtures over a range of values of the reduced electric fields strength, E/N, the ratio of the electric field strength to the neutral density, using cross sections from the available databases. New contributors are welcome and anyone wishing to create a database and upload data can request a username and password. LXCat is part of a larger, community-wide effort aimed at collecting, evaluating, and sharing data relevant to modeling low temperature plasmas. To illustrate the utility of LXCat in this context, we compare electron swarm parameters in argon calculated using the different compilations of cross sections presently available on LXCat. These compilations include quite different groupings of excited states, yet lead to swarm parameters in good agreement. LXCat is available at http://www.lxcat.laplace.univ-tlse.fr.

  8. Theory and action for health promotion illustrations from the North Karelia Project.

    PubMed Central

    McAlister, A; Puska, P; Salonen, J T; Tuomilehto, J; Koskela, K

    1982-01-01

    The North Karelia Project in Finland illustrates the fundamental goals of health promotion. Specific activities of the project serve as examples of how concepts from the social and behavioral sciences can be applied to achieve estimated reductions in predicted risk of disease. The results in North Karelia are not conclusive, but they are encouraging, and the investigations conducted there is an essential reference for future research in health promotion and disease prevention. PMID:7053618

  9. The ultrasonic ranging and data system for radiological surveys in the UMTRA (Uranium Mill Tailings Remedial Action) Project

    SciTech Connect

    Little, C.A.; Berven, B.A.; Blair, M.S.; Dickerson, K.S.; Pickering, D.A.

    1988-01-01

    The Ultrasonic Ranging and Data System (USRADS) was developed to allow radiation exposure data and positional information to be collected, stored and analyzed in a more efficient manner than currently employed on the (Uranium Mill Tailings Remedial Action (UMTRA) project. USRADS is a portable unit which employs ultrasonics, radio frequency transmissions, and a personal computer. Operational experience indicates that the system results in increased information about the property with decreased data analysis and transcription effort and only slightly more field effort. 5 refs., 3 figs., 2 tabs.

  10. Application of NEPA to nuclear weapons production, storage, and testing Weinberger v. Catholic Action of Hawaii/Peace Education Project

    SciTech Connect

    Sauber, A.J.

    1984-01-01

    The National Environmental Policy Act (NEPA) requirement of environmental impact statements for the testing of military equipment, specifically nuclear weapons, conflicts with national security objectives. The author examines NEPA and the Freedom of Information Act (FOIA) in terms of the environmental effects of weapons testing and the relevant case law. The Supreme Court's decision in Catholic Action of Hawaii/Peace Education Project sought to resolve the conflict by distinguishing between a project which is contemplated and one which is proposed. The classification scheme embodied in the FOIA exemption for national security may cause unwarranted frustration of NEPA's goals. The author outlines a new classification system and review mechanism that could curb military abuse in this area.

  11. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    PubMed

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them. PMID:24722740

  12. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 1

    SciTech Connect

    Not Available

    1993-12-31

    This report describes environmental monitoring and compliance at eight UMTRA sites where remedial action was underway during 1992 and at the ten sites that were complete at the end of 1992. Volume I contains information for Ambrosia Lake, NM; Cannonsburg/Burrell, PA; Durango, CO; Falls City, TX; Grand Junction, CO; Green River, UT; and Gunnison, CO. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information.

  13. 2014 Well Completion Report for Corrective Action Unit 447 Project Shoal Area Churchill County, Nevada October 2015

    SciTech Connect

    Findlay, Rick

    2015-11-01

    This report summarizes the drilling program conducted by the U.S. Department of Energy (DOE) Office of Legacy Management at the Project Shoal Area (Shoal) Subsurface Corrective Action Unit 447 in Churchill County, Nevada. Shoal was the location of an underground nuclear test conducted on October 26, 1963, as part of the Vela Uniform program sponsored jointly by the U.S. Department of Defense and the U.S. Atomic Energy Commission (a predecessor to DOE). The test consisted of detonating a 12-kiloton nuclear device in granitic rock at a depth of approximately 1,211 feet (ft) below ground surface (bgs) (AEC 1964). The corrective action strategy for the site is focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network at the site. Field activities associated with the project were conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended) and applicable Nevada Division of Environmental Protection (NDEP) policies and regulations.

  14. Project Citizen: Promoting Action-Oriented Citizen Science in the Classroom

    ERIC Educational Resources Information Center

    Green, Carie; Medina-Jerez, William

    2012-01-01

    In recent years, citizen science projects have emerged as a means to involve students in scientific inquiry, particularly in the fields of ecology and environmental science. A citizen scientist is "a volunteer who collects and/or processes data as part of a scientific inquiry" (Silverton 2009, p. 467). Participation in citizen science fosters an…

  15. Participatory Action Research in Education: The National Latino/a Education Research Agenda Project.

    ERIC Educational Resources Information Center

    Pedraza, Pedro

    2002-01-01

    The National Latino/a Education Research Agenda Project, an initiative developed at the Centro de Estudios Puertorriquenos at Hunter College, aims to give voice, perspective, and a research knowledge base to such issues as school reform and to improve academic outcomes and the long term life chances of Latino students and their families and…

  16. Particles in Action. Study Guide. Unit C2. ZIM-SCI, Zimbabwe Secondary School Science Project.

    ERIC Educational Resources Information Center

    Stocklmayer, Sue

    The Zimbabwe Secondary School Science Project (ZIM-SCI) developed student study guides, corresponding teaching guides, and science kits for a low-cost science course which could be taught during the first 2 years of secondary school without the aid of qualified teachers and conventional laboratories. This ZIM-SCI study guide is a four-part unit…

  17. The Facebook-in-Action: Challenging, Harnessing and Enhancing Students Class Assignments and Projects

    ERIC Educational Resources Information Center

    Saifudin, Adam Mohd; Yacob, Aizan; Saad, Rohaizah

    2016-01-01

    Issues of universities students harnessing and capitalizing the usage of Facebook for their own learning capabilities and effective thinking is always the focus of education scholars, in assessing the quality class assignments and projects produced by them. Therefore, Facebook is now becoming unbearable influence since the internet activation in…

  18. A Collaborative Action Research Project in an Inclusive Setting: Assisting a Blind Student

    ERIC Educational Resources Information Center

    Argyropoulos, Vassilios; Stamouli, Marina

    2006-01-01

    There has been a lot of discussion about the context and the content of integration and inclusion in Greece for the students with visual impairments. These discussions have led to the formulation of models of inclusion such as the co-teaching scheme. This article presents a project focused on an educational setting within which a sixth-grader…

  19. Community Colleges and Regional Recovery: Strategies for State Action. Project on State and Metropolitan Innovation

    ERIC Educational Resources Information Center

    Kazis, Richard

    2011-01-01

    Employers need a pipeline of quality workers with different levels of skill and desired earnings. Almost half of U.S. jobs today can be defined as "middle skill" jobs, requiring less than a four-year degree but more than a high school diploma. The Bureau of Labor Statistics (BLS) occupational projections indicate that job categories for which the…

  20. Projecting the self into the future in individuals with schizophrenia: a preliminary cross-sectional study.

    PubMed

    Raffard, Stéphane; Bortolon, Catherine; D'Argembeau, Arnaud; Gardes, Jeanne; Gely-Nargeot, Marie-Christine; Capdevielle, Delphine; Van der Linden, Martial

    2016-07-01

    The ability to project oneself into the future contributes to development and maintenance of a coherent sense of identity. If recent research has revealed that schizophrenia is associated with difficulties envisioning the future, little is known about patients' future self-representations. In this study, 27 participants with schizophrenia and 26 healthy controls were asked to simulate mental representations of plausible and highly significant future events (self-defining future projections, SDFPs) that they anticipate to happen in their personal future. Main results showed that schizophrenia patients had difficulties in reflecting on the broader meaning and implications of imagined future events. In addition, and contrary to our hypothesis, a large majority of SDFPs in schizophrenia patients were positive events, including achievements, relationship, and leisure contents. Interestingly, patients and controls did not differ on the perceived probability that these events will occur in the future. Our results suggest that schizophrenia patients have an exaggerated positive perception of their future selves. Together, these findings lend support to the idea that past and future self-defining representations have both similar and distinct characteristics in schizophrenia. PMID:26274839

  1. 23 CFR 140.605 - Approval actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Approval actions. 140.605 Section 140.605 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.605 Approval actions. (a) Authorization to proceed with...

  2. 33 CFR 230.8 - Emergency actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Emergency actions include Flood Control and Coastal Emergencies Activities pursuant to Pub. L. 84-99, as amended, and projects constructed under sections 3 of the River and Harbor Act of 1945 or 14 of the Flood Control Act of 1946 of the Continuing Authorities Program. When possible, emergency actions...

  3. 18 CFR 16.21 - Operation of projects with a minor or minor part license not subject to sections 14 and 15 of the...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... licensee of a minor or minor part project not subject to sections 14 and 15 of the Federal Power Act that... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Operation of projects with a minor or minor part license not subject to sections 14 and 15 of the Federal Power Act...

  4. Leading multi-professional teams in the children’s workforce: an action research project

    PubMed Central

    Stuart, Kaz

    2012-01-01

    Introduction The 2004 Children Act in the UK saw the introduction of integrated working in children’s services. A raft of change followed with processes designed to make joint working easier, and models and theories to support the development of integrated work. This paper explores the links between key concepts and practice. Methods A practitioner action research approach is taken using an autoethnographic account kept over six months. The research question was, to what extent is this group collaborating? Results When the architecture of practice was revealed, differences between espoused and real practice could be seen. Whilst understanding and displaying the outward signs of an effective multi professional group, the individuals did not trust one another. This was exhibited by covert interprofessional issues. As a result, collaborative inertia was achieved. This realisation prompted them to participate in further developmental and participative action research. Conclusion The paper concludes that trust and relational agency are central to effective leadership of multi professional teams. PMID:22371690

  5. Teaching clinical reasoning by making thinking visible: an action research project with allied health clinical educators

    PubMed Central

    2014-01-01

    Background Clinical reasoning is fundamental to all forms of professional health practice, however it is also difficult to teach and learn because it is complex, tacit, and effectively invisible for students. In this paper we present an approach for teaching clinical reasoning based on making expert thinking visible and accessible to students. Methods Twenty-one experienced allied health clinical educators from three tertiary Australian hospitals attended up to seven action research discussion sessions, where they developed a tentative heuristic of their own clinical reasoning, trialled it with students, evaluated if it helped their students to reason clinically, and then refined it so the heuristic was targeted to developing each student’s reasoning skills. Data included participants’ written descriptions of the thinking routines they developed and trialed with their students and the transcribed action research discussion sessions. Content analysis was used to summarise this data and categorise themes about teaching and learning clinical reasoning. Results Two overriding themes emerged from participants’ reports about using the ‘making thinking visible approach’. The first was a specific focus by participating educators on students’ understanding of the reasoning process and the second was heightened awareness of personal teaching styles and approaches to teaching clinical reasoning. Conclusions We suggest that the making thinking visible approach has potential to assist educators to become more reflective about their clinical reasoning teaching and acts as a scaffold to assist them to articulate their own expert reasoning and for students to access and use. PMID:24479414

  6. 76 FR 77301 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    .... Stage 1 is currently scheduled for construction from approximately 2013 to 2015. Stage 2 will convert... 4(f) of the Department of Transportation Act of 1966 , Section 6(f) of the Land and Water... by the Uniform Relocation Act Amendments of 1987 . 7. Wetlands and Water Resources: Clean Water...

  7. Use of integral experiments for the assessment of the 235U capture cross section within the CIELO Project

    NASA Astrophysics Data System (ADS)

    Ichou, Raphaelle; Leclaire, Nicolas; Leal, Luiz; Ivanov, Evgeny

    2016-03-01

    A new 235U capture cross-section evaluation, evaluated by ORNL and the CEA Bruyères-le-Châtel (BRC) has been proposed within the CIELO project. IRSN, who participates in the CIELO project, contributes with data testing and has carried out benchmark calculations using few benchmarks, extracted from the ICSBEP database, for testing the new 235U evaluation. The benchmarks have been selected by privileging the experiments showing small experimental uncertainties and a significant sensitivity to 235U capture cross-section. The keff calculations were performed with both the MCNP 6 code and the 5.C.1 release of the MORET 5 code, using the ENDF/B-VII.1 library for all isotopes except 235U, for which both the ENDF/B-VII.1 and the new 235U evaluation was used. The benchmark selection allowed highlighting a significant effect on keff of the new 235U capture cross-section. The results of this data testing, provided as input for the evaluators, are presented here.

  8. Service user integration into social work education: lessons learned from nordic participatory action projects.

    PubMed

    Angelin, Anna

    2015-01-01

    Service users have lacked substantial influence, access, and participation in social work education in Norway and Sweden. In this article the author presents comparative analyses of two participatory projects that have developed and implemented practices that integrate service users into academic social work education and empower service users. The Norwegian HUSK project and the Social Work as Mobilization and Entrepreneurship course, also known as the "Mobilization course," at Lund University in Sweden demonstrate collaboration between research, social work education, and service users. The conclusions focus on the importance of the empowering processes by including recognition and dialogue, co-learning in practice, and the use of neutral venues to ensure effective user participation. The inclusion of service users in social work education can improve both practice and education. PMID:25662088

  9. Women Reaching Women: A Story of Change. The Role of Narrative in Building Trust and Commitment during an Action Research Project

    ERIC Educational Resources Information Center

    Langley, Dawn

    2012-01-01

    Women Reaching Women was a three-year action research project aimed at raising awareness of world poverty, gender inequality and climate change. The project brought together the National Federation of Women's Institutes, Oxfam, the Everyone Foundation and a unique group of 28 women drawn from Women's Institutes across the country. The project…

  10. Seeking to Bridge the Divide: Linking Formal and Non-Formal Education in Uttar-Pradesh, India. IBE Collaborative Projects: Strengthening Capacities through Action

    ERIC Educational Resources Information Center

    Zutshi, Bupinder

    2004-01-01

    The new monograph series, IBE Collaborative Projects: Strengthening Capacities through Action, documents projects initiated and managed by local or national level institutions in diverse countries, which have been technically or academically assisted by UNESCO's International Bureau of Education (IBE). This first publication in the series…

  11. The content, format and timing of a preparation for childhood hospitalization booklet: An action research project.

    PubMed

    Gordon, Bronwyn K; Crisp, Jackie

    2016-06-01

    The experience of childhood hospitalization may be improved by appropriate preparation. As part of a larger project to improve preparation practices for children and their families, a group of health-care professionals investigated the content, format and timing of a pre-existing preparation booklet for a particular procedure. This article analyses the evaluation of the preparation booklet that led to a finding that collaboration among health-care professionals enables improved practice and shared professional power and responsibility. PMID:25613140

  12. 18 CFR 12.22 - Contents of emergency action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Contents of emergency action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS Emergency Action Plans...

  13. Quarry Haul Road Ecological Survey. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri: Revision 1

    SciTech Connect

    Not Available

    1992-09-01

    This biological survey was performed to document the summer flora and fauna found along the haul road constructed as part of the remedial action for the quarry bulk waste. State and Federal species listed as threatened or endangered were noted if encountered while surveying. Sampling locations were equally spaced along the quarry haul road, and a survey for vegetation and birds conducted at each location. Bird observations were conducted as breeding bird surveys once in June of 1991, and again in June of 1992. Each year`s survey includes two observations in the early morning and one late in the evening. Vegetation surveys were conducted in 1991 using quadrants and transects. mammal, reptile, and amphibian sightings were noted as encountered.

  14. Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

    SciTech Connect

    Bolinger, Mark; Wiser, Ryan; Darghouth, Naim

    2010-05-05

    This article evaluates the first year of the Section 1603 Treasury cash grant program, which enables renewable power projects in the U.S. to elect cash grants in lieu of the federal tax credits that are otherwise available. To date, the program has been heavily subscribed, particularly by wind power projects, which had received 86% of the nearly $2.6 billion in grants that had been disbursed as of March 1, 2010. As of that date, 6.2 GW of the 10 GW of new wind capacity installed in the U.S. in 2009 had applied for grants in lieu of production tax credits. Roughly 2.4 GW of this wind capacity may not have otherwise been built in 2009 absent the grant program; this 2.4 GW may have supported approximately 51,600 short-term full-time-equivalent (FTE) gross job-years in the U.S. during the construction phase of these wind projects, and 3,860 longterm FTE gross jobs during the operational phase. The program’s popularity stems from the significant economic value that it provides to renewable power projects, relative to the otherwise available tax credits. Although grants reward investment rather than efficient performance, this evaluation finds no evidence at this time of either widespread “gold-plating” or performance problems.

  15. Commissioning the NIFFTE Time Projection Chamber: Towards the 238U / 235U (n, f) Cross-section Ratio

    NASA Astrophysics Data System (ADS)

    Meharchand, R.; Asner, D. M.; Baker, R. G.; Bundgaard, J.; Burgett, E.; Cunningham, M.; Deaven, J.; Duke, D. L.; Greife, U.; Grimes, S.; Heffner, M.; Hill, T.; Isenhower, D.; Klay, J. L.; Kleinrath, V.; Kornilov, N.; Laptev, A. B.; Loveland, W.; Massey, T. N.; Qu, H.; Ruz, J.; Sangiorgio, S.; Seilhan, B.; Snyder, L.; Stave, S.; Tatishvili, G.; Thornton, R. T.; Tovesson, F.; Towell, D.; Towell, R. S.; Watson, S.; Wendt, B.; Wood, L.

    2014-05-01

    The Neutron Induced Fission Fragment Tracking Experiment (NIFFTE) collaboration is developing a Time Projection Chamber (TPC) to measure neutron-induced fission cross sections with unprecedented accuracy. Modifying TPC technology for nuclear physics applications is a challenging endeavor, and frequent testing and evaluation is required to ensure that all components are behaving as expected. In-beam tests of the NIFFTE TPC at the Los Alamos Neutron Science Center (LAN-SCE) commenced in 2010. An overview of the NIFFTE TPC experiments performed at LANSCE will be presented, along with preliminary performance results.

  16. The GODAE High Resolution SST Project: Standards Based Interoperability in Action

    NASA Astrophysics Data System (ADS)

    Casey, K. S.

    2007-12-01

    The Global Ocean Data Assimilation Experiment (GODAE) High Resolution Sea Surface Temperature (GHRSST) project is a large scale international effort to coordinate the production, distribution, and archiving of a wide range of satellite-based SST datasets. Built on existing standards for data formats and both file-level and collection- level metadata, the GHRSST project has achieved a high level of success in an area that has seen little past national cooperation and even less international cooperation. Today, GHRSST data are produced in common formats following internationally accepted content standards by government agencies, academic institutions, and commercial companies around the world. By following the format and content standards for metadata and data, GHRSST has successfully built and deployed a Regional/Global Task Sharing framework in which data and metadata are produced at local centers but centrally managed at a Global Data Assembly Center and archived at a Long Term Stewardship and Reanalysis Facility. Interoperable data access is enabled at all levels of this international framework. This presentation will examine the lessons learned over the last several years as GHRSST has adopted numerous standards, including netCDF with Climate and Forecast (CF) attribute conventions for data, and both Global Change Master Directory Document Interchange Format and Federal Geographic Data Commission standards for metadata. Plans for future adoption of emerging standards like netCDF-4 and ISO19115 will also be discussed.

  17. The project HICARE: cross-sectoral action alliance against multi-resistant pathogens

    PubMed Central

    Linder, Roland; Thoms, Isabell; Pfenning, Ingo; Schadowski, Rolando; Möws, Volker

    2011-01-01

    Multi-resistant pathogens are a serious problem on a considerable scale for the health sector. Patients with infections induced by multi-resistant bacteria cause enormous additional treatment costs of around 20,500 € per insured. Due to the recently used billing and documentation system there is a significant shortage of information transparency. The guidelines for hospital hygiene and infection prevention published by the Robert Koch Institute (RKI) include a presumption provision, which means that subject to compliance with these guidelines the observance of the current state of medical science is suspected. In case of a derogation, a scientific justification is necessary, which is used e.g. in connection with liability questions. Within the framework of legal reforms in 2011, the legislator aspires a nationwide improvement of hygiene quality in medical institutions and information transparency. Many specific issues about the general reporting obligation of infections with multi-resistant pathogens or about the standardized exchange of infection documentations between medical institution and health authority remain unresolved. Regional, cross-sectoral networks create the base to tackle targeted measures collectively and may develop sustainable and tailored solutions for their region. With these considerations in mind, the project HICARE was founded in Mecklenburg-Vorpommern. The project pursues the aim to develop an intervention strategy against the spread of multi-resistant pathogens. Health insurances make an important contribution to quality of medical treatment by participation. PMID:22242106

  18. Tele-autonomous systems: New methods for projecting and coordinating intelligent action at a distance

    NASA Technical Reports Server (NTRS)

    Conway, Lynn; Volz, Richard; Walker, Michael W.

    1989-01-01

    There is a growing need for humans to perform complex remote operations and to extend the intelligence and experience of experts to distant applications. It is asserted that a blending of human intelligence, modern information technology, remote control, and intelligent autonomous systems is required, and have coined the term tele-autonomous technology, or tele-automation, for methods producing intelligent action at a distance. Tele-automation goes beyond autonomous control by blending in human intelligence. It goes beyond tele-operation by incorporating as much autonomy as possible and/or reasonable. A new approach is discussed for solving one of the fundamental problems facing tele-autonomous systems: The need to overcome time delays due to telemetry and signal propagation. New concepts are introduced called time and position clutches, that allow the time and position frames between the local user control and the remote device being controlled, to be desynchronized respectively. The design and implementation of these mechanisms are described in detail. It is demonstrated that these mechanisms lead to substantial telemanipulation performance improvements, including the result of improvements even in the absence of time delays. The new controls also yield a simple protocol for control handoffs of manipulation tasks between local operators and remote systems.

  19. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project - status to date January 1998

    SciTech Connect

    1998-04-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fifth year (1997) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). Staffing issues this year have been a challenge with the resignation of an Environmental Specialist (ES) in June 1997, and the death of Robert Stovall, an Environmental Engineer (EE) II in August 1997. Progress made during this period includes securing a contract laboratory, participation in several workgroup meetings for activities at the site, oversight of the Feasibility Study/Proposed Plan (FS/PP), coordination between the US Department of Energy and the various State regulatory programs and interactions with the local public drinking water supply agency and health departments.

  20. Does Education Plus Action Lead to Leadership on Climate? Preliminary Results from the ACE Leadership Development Longitudinal Survey Project

    NASA Astrophysics Data System (ADS)

    Anderson, R. K.; Qusba, L.; Lappe, M.; Flora, J. A.

    2014-12-01

    Through education and leadership development, Alliance for Climate Education (ACE) is building a generation of confident and capable youth driving climate solutions now throughout their lives. In 2011-12, a random sample of 2,800 high school students across the country was surveyed before and after seeing the ACE Assembly on climate science and solutions. The survey showed that the ACE Assembly resulted in a 27% increase in climate science knowledge scores, with 59% of students increasing their intentions to take action on climate and a doubling of the number of students talking to parents and peers about climate change. Students were also compared to the Global Warming's Six Americas classification of Americans' views on climate. Following the ACE Assembly, 60% of students were alarmed or concerned about climate change. Building off these results, in 2014 ACE began to assess the results of its leadership development program that follows the ACE Assembly. The goal of this survey project is to measure ACE's long-term impact on students' college and career pathways, civic engagement and climate action. Preliminary results show that a majority of students in ACE's leadership development program are alarmed about global warming and are having conversations about global warming. A majority of these students also feel confident in their ability to lead a climate-related campaign in their school and community. These students will continue to be surveyed through 2015.

  1. Groundwater Model Validation for the Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2008-05-19

    Stoller has examined newly collected water level data in multiple wells at the Shoal site. On the basis of these data and information presented in the report, we are currently unable to confirm that the model is successfully validated. Most of our concerns regarding the model stem from two findings: (1) measured water level data do not provide clear evidence of a prevailing lateral flow direction; and (2) the groundwater flow system has been and continues to be in a transient state, which contrasts with assumed steady-state conditions in the model. The results of DRI's model validation efforts and observations made regarding water level behavior are discussed in the following sections. A summary of our conclusions and recommendations for a path forward are also provided in this letter report.

  2. An assessment of plant biointrusion at the Uranium Mill Tailings Remedial Action Project rock-covered disposal cells

    SciTech Connect

    Not Available

    1990-10-01

    This study is one of a number of special studies that have been conducted regarding various aspects of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This special study was proposed following routine surveillance and maintenance surveys and observations reported in a special study of vegetative covers (DOE, 1988), in which plants were observed growing up through the rock erosion layer at recently completed disposal cells. Some of the plants observed were deep-rooted woody species, and questions concerning root intrusion into disposal cells and the need to control plant growth were raised. The special study discussed in this report was designed to address some of the ramifications of plant growth on disposal cells that have rock covers. The NRC has chosen rock covers over vegetative covers in the arid western United States because licenses cannot substantiate that the vegetative covers will be significantly greater than 30 percent and preferably 70 percent,'' which is the amount of vegetation required to reduce flow to a point of stability.'' The potential impacts of vegetation growing in rock covers are not addressed by the NRC (1990). The objectives, then, of this study were to determine the species of plants growing on two rock-covered disposal cells, study the rooting pattern of plants on these cells, and identify possible impacts of plant root penetration on these and other UMTRA Project rock-covered cells.

  3. Environmental analysis and data report prepared for the environmental assessment of remedial action at the inactive uranium mill tailings site near Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Not Available

    1991-12-01

    This document contains information and data gathered in support of the preparation of the environmental assessment (EA) of the proposed remedial action at the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas. The Falls City EA was prepared pursuant to the National Environmental Policy Act (NEPA), which requires Federal agencies to assess the impacts of their actions on the environment. It examines the short- and long-term effects of the US Department of Energy's (DOE) remedial action for the Falls City site as well as the no action alternative. The DOE will use the information and analyses presented in the EA to determine whether the proposed action would have a significant impact on the environment. If the impacts are determined to be significant, an environmental impact statement (EIS) will be prepared. If the impacts are not determined to be significant, the DOE may issue a Finding of No Significant Impact (FONSI) and implement the proposed action. The information and data presented in this report are for background purposes only and are not required as part of the NEPA decision-making process.

  4. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    SciTech Connect

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  5. Measuring Muon-Neutrino Charged-Current Differential Cross Sections with a Liquid Argon Time Projection Chamber

    SciTech Connect

    Spitz, Joshua B.

    2011-01-01

    More than 80 years after its proposed existence, the neutrino remains largely mysterious and elusive. Precision measurements of the neutrino's properties are just now beginning to take place. Such measurements are required in order to determine the mass of the neutrino, how many neutrinos there are, if neutrinos are different than anti-neutrinos, and more. Muon-neutrino charged-current differential cross sections on an argon target in terms of the outgoing muon momentum and angle are presented. The measurements have been taken with the ArgoNeuT Liquid Argon Time Projection Chamber (LArTPC) experiment. ArgoNeuT is the first LArTPC to ever take data in a low energy neutrino beam, having collected thousands of neutrino and anti-neutrino events in the NuMI beamline at Fermilab. The results are relevant for long baseline neutrino oscillation experiments searching for non-zero $\\theta_{13}$, CP-violation in the lepton sector, and the sign of the neutrino mass hierarchy, among other things. Furthermore, the differential cross sections are important for understanding the nature of the neutrino-nucleus interaction in general. These measurements represent a significant step forward for LArTPC technology as they are among the first neutrino physics results with such a device.

  6. Measurement of the U-238/U-235 (n,f) cross-section ratio with the NIFFTE Time Projection Chamber

    NASA Astrophysics Data System (ADS)

    Meharchand, Rhiannon; Niffte Collaboration

    2013-10-01

    Nuclear data play a fundamental role in energy and defense related applications. In recent years, understanding of these systems has become dependent upon advanced simulation and modeling, where uncertainties in nuclear data propagate into calculated performance parameters. It is important therefore that nuclear data uncertainties are minimized and well-understood. To this end, the Neutron Induced Fission Fragment Tracking Experiment (NIFFTE) collaboration is developing a Time Projection Chamber (TPC) to measure energy-differential (n,f) cross sections with unprecedented precision. (n,f) cross-section measurements with the NIFFTE TPC take place at the Los Alamos Neutron Science Center (LANSCE) WNR facility, a spallation neutron source which provides a neutron spectrum ranging from hundreds of keV to hundreds of MeV. During the 2012 LANSCE run cycle, data were collected on several actinide samples, including U-238 and U-235. These data, along with those collected during the 2013 LANSCE run cycle, will be used to deduce a U-238/U-235 (n,f) cross-section ratio, to benchmark TPC performance, and to provide high-quality data to the community. A brief overview of the NIFFTE TPC and preliminary analysis of the U-238/U-235 (n,f) ratio data will be presented. This work was performed under the auspices of the U.S. Department of Energy by Los Alamos National Security, LLC under contract DE-AC52-06NA25396 and by Lawrence Livermore National Security, LLC under contract DE-AC52-07NA27344. LA-UR-13-24779.

  7. 34 CFR 222.141 - For what types of projects may the Secretary provide assistance under section 8008 of the Act?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 1 2012-07-01 2012-07-01 false For what types of projects may the Secretary provide assistance under section 8008 of the Act? 222.141 Section 222.141 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND SECONDARY EDUCATION, DEPARTMENT OF EDUCATION IMPACT AID PROGRAMS Facilities Assistance...

  8. 18 CFR 16.9 - Applications for new licenses and nonpower licenses for projects subject to sections 14 and 15 of...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Applications for new licenses and nonpower licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.9 Section 16.9 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT...

  9. 18 CFR 16.9 - Applications for new licenses and nonpower licenses for projects subject to sections 14 and 15 of...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Applications for new licenses and nonpower licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.9 Section 16.9 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT...

  10. 18 CFR 16.9 - Applications for new licenses and nonpower licenses for projects subject to sections 14 and 15 of...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Applications for new licenses and nonpower licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.9 Section 16.9 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT...

  11. 18 CFR 16.9 - Applications for new licenses and nonpower licenses for projects subject to sections 14 and 15 of...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Applications for new licenses and nonpower licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.9 Section 16.9 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT...

  12. 18 CFR 16.9 - Applications for new licenses and nonpower licenses for projects subject to sections 14 and 15 of...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Applications for new licenses and nonpower licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.9 Section 16.9 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT...

  13. Assessment in Action: Collaborative Action Research Focused on Mathematics and Science Assessments. Reports of Twenty-Three Teacher-Research Projects.

    ERIC Educational Resources Information Center

    Dearn, Ceri; And Others

    The works reported in this book represent a second phase to a 2-day summer conference that focused on assessment in mathematics and science classrooms. This book presents research and findings of a subset of the conference participants who investigated a self-selected aspect of assessment in their educational environments. Action research was the…

  14. An Action Research Project: Development of a Pre-Licensure Examination Review Course for Emergency Medical Technician Program Graduates at a Rural Community College

    ERIC Educational Resources Information Center

    Boucher, Daryl

    2013-01-01

    This action research project examined how "Efficiency in Learning" ("EL") strategies, "Appreciative Inquiry" ("AI") and the "Interactive Model of Program Planning" ("IMPP") could be used to discern the content and preferred pedagogical approaches in the development of a pre-licensure…

  15. An Action Resarch Proposal: Identifying and Addressing Problems Related to RACC's Writing Laboratory. Title III Curriculum Enrichment Activity: Faculty Development Project. Final Report.

    ERIC Educational Resources Information Center

    Horner, Annette; Jacobson, Karen H.

    An action research project was undertaken to understand how the Writing Laboratory at Reading Area Community College (RACC) defines and accomplishes its work, what faculty and students expect of the lab, and how they make use of it. The investigation sought to foster discussion and reflection on the appropriate role and staffing of a college…

  16. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  17. Improving Governance, Leadership, and Learning in New Jersey. State Action for Education Leadership Project (SAELP) Forum, January 28-29, 2003. Field Notes

    ERIC Educational Resources Information Center

    Bleistein, Stacey, Ed.

    2004-01-01

    New Jersey is one of fifteen states selected by the Wallace-Reader's Digest Fund to receive a planning and implementation grant for setting a reform agenda for a series of state policies that are designed to improve educational leadership and student learning. Under this grant, the State Action for Education Leadership Project (SAELP)…

  18. Using Nikola Tesla's Story and His Experiments as Presented in the Film "The Prestige" to Promote Scientific Inquiry: A Report of an Action Research Project

    ERIC Educational Resources Information Center

    Hadzigeorgiou, Yannis; Garganourakis, Vassilios

    2010-01-01

    This paper reports on an action research project undertaken with the primary aim of investigating the extent to which situations that evoke a sense of wonder can promote scientific inquiry. Given the intense interest, curiosity, and wonder that some students had begun to develop after seeing the film "The Prestige", a science teacher used this…

  19. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    SciTech Connect

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  20. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  1. Understanding the challenges of palliative care in everyday clinical practice: an example from a COPD action research project.

    PubMed

    Hynes, Geralyn; Kavanagh, Fiona; Hogan, Christine; Ryan, Kitty; Rogers, Linda; Brosnan, Jenny; Coghlan, David

    2015-09-01

    Palliative care seeks to improve the quality of life for patients suffering from the impact of life-limiting illnesses. Palliative care encompasses but is more than end-of-life care, which is defined as care during the final hours/days/weeks of life. Although palliative care policies increasingly require all healthcare professionals to have at least basic or non-specialist skills in palliative care, international evidence suggests there are difficulties in realising such policies. This study reports on an action research project aimed at developing respiratory nursing practice to address the palliative care needs of patients with advanced chronic obstructive pulmonary disease (COPD). The findings suggest that interlevel dynamics at individual, team, interdepartmental and organisational levels are an important factor in the capacity of respiratory nurses to embed non-specialist palliative care in their practice. At best, current efforts to embed palliative care in everyday practice may improve end-of-life care in the final hours/days/weeks of life. However, embedding palliative care in everyday practice requires a more fundamental shift in the organisation of care. PMID:25514830

  2. Waste minimization opportunities at the U.S. Uranium Mill Tailings Remedial Action (UMTRA) Project, Rifle, Colorado, site

    SciTech Connect

    Hartmann, G.L.; Arp, S.; Hempill, H.

    1993-12-31

    At two uranium mill sites in Rifle, Colorado, the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is removing uranium mill tailings and contaminated subgrade soils. This remediation activity will result in the production of groundwater contaminated with uranium, heavy metals, ammonia, sulfates, and total dissolved solids (TDS). The initial remediation plan called for a wastewater treatment plant for removal of the uranium, heavy metals, and ammonia, with disposal of the treated water, which still includes the sulfates and TDSS, to the Colorado River. The National Pollutant Discharge Elimination (NPDES) permit issued by the Colorado Department of Health for the two Rifle sites contained more restrictive discharge limits than originally anticipated. During the detailed review of alternate treatment systems to meet these more restrictive limits, the proposed construction procedures were reviewed emphasizing the methods to minimize groundwater production to reduce the size of the water treatment facility, or to eliminate it entirely. It was determined that with changes to the excavation procedures and use of the contaminated groundwater for use in dust suppression at the disposal site, discharge to the river could be eliminated completely.

  3. 76 FR 20807 - Notice of Final Federal Agency Actions on the Sellwood Bridge Project, SE Tacoma Street and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ...), Department of Transportation. ACTION: Notice of limitation on claims for judicial review of actions by FHWA... subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions that are... Federal law that authorizes judicial review of a claim provides a time period of less than 180 days...

  4. Give Water a Hand. Farm and Ranch Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation on a farm or ranch, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  5. Projecting future wave climates and corresponding shoreline changes along the differently exposed coastal sections of the Baltic Sea

    NASA Astrophysics Data System (ADS)

    Suursaar, Ülo; Tõnisson, Hannes

    2015-04-01

    The aim of the study is to analyze the recently observed and projected future coastal changes in differently exposed Estonian coastal sections as a result of changing wind and wave climates. Along the shoreline of the practically tideless Baltic Sea, the increase in storminess has already impacted the coastal environment over the last 50 years. However, the number of storms, as well as their pathways, has been fluctuating considerably over the last decades. Furthermore, forecasting future hydrodynamic conditions and corresponding coastal changes is a rather mixed, yet crucial task. A number of Estonian study sites have been regularly examined by coastal scientists since the 1960s. Six coastal sections have been chosen for this study: Harilaid Peninsula (exposed to SW), Letipea-Sillamäe (N), Kõiguste-Nasva (SE), Kihnu-Pärnu (S), and two sides of the Osmussaar Island (W, N). Since the 2000s, use of GPS instruments and GIS software has enabled year-to-year changes in the shoreline to be tracked and the calculation of the corresponding areas or volumes due to accumulation and erosion. Recently digitized aerial photographs, as well as orthophotos and old topographic maps, enable the calculation of changes over longer sub-periods. Based on recorded and hindcasted changes in wind-driven hydrodynamic conditions, we found relationships between forcing conditions and the rates at which shorelines were changing. For future changes, wave climates were projected for the selected coastal sections of special geomorphic interest, where also a series of hydrodynamic surveys (waves, currents, sea level) were carried out using ADCP-s in 2006-2014. Wave parameters were consecutively hindcasted using a site-dependently calibrated fetch-based wave model. As the full calculation period (1966-2013) might suffer from inhomogeneity of wind input data, a confidently homogeneous time cut (2004-2013; 10 full years with hourly resolution) was chosen as a baseline (or control) period. An

  6. 45 CFR 1210.3-2 - Removal from project.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Removal from project. 1210.3-2 Section 1210.3-2... Termination § 1210.3-2 Removal from project. (a) Removal of a Volunteer from the project assignment may be... ACTION Agency. (b) A request for removal of a Volunteer must be submitted to the ACTION State...

  7. Toward Improving Atmospheric Models and Ozone Projections: Laboratory UV Absorption Cross Sections and Equilibrium Constant of ClOOCl

    NASA Astrophysics Data System (ADS)

    Wilmouth, D. M.; Klobas, J. E.; Anderson, J. G.

    2015-12-01

    Thirty years have now passed since the discovery of the Antarctic ozone hole, and despite comprehensive international agreements being in place to phase out CFCs and halons, polar ozone losses generally remain severe. The relevant halogen compounds have very long atmospheric lifetimes, which ensures that seasonal polar ozone depletion will likely continue for decades to come. Changes in the climate system can further impact stratospheric ozone abundance through changes in the temperature and water vapor structure of the atmosphere and through the potential initiation of solar radiation management efforts. In many ways, the rate at which climate is changing must now be considered fast relative to the slow removal of halogens from the atmosphere. Photochemical models of Earth's atmosphere play a critical role in understanding and projecting ozone levels, but in order for these models to be accurate, they must be built on a foundation of accurate laboratory data. ClOOCl is the centerpiece of the catalytic cycle that accounts for more than 50% of the chlorine-catalyzed ozone loss in the Arctic and Antarctic stratosphere every spring, and so uncertainties in the ultraviolet cross sections of ClOOCl are particularly important. Additionally, the equilibrium constant of the dimerization reaction of ClO merits further study, as there are important discrepancies between in situ measurements and lab-based models, and the JPL-11 recommended equilibrium constant includes high error bars at atmospherically relevant temperatures (~75% at 200 K). Here we analyze available data for the ClOOCl ultraviolet cross sections and equilibrium constant and present new laboratory spectroscopic results.

  8. 75 FR 58380 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... clarifiers as part of a larger overall wastewater treatment plant upgrade project. This is a project specific... gates for two final clarifiers as part of a wastewater treatment plant upgrade project. Based on the... final clarifiers as part of a larger overall wastewater treatment plant upgrade project. The...

  9. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect

    Chernoff, A.R. . Uranium Mill Tailings Remedial Action Project Office); Lacker, D.K. . Bureau of Radiation Control)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  10. Ethical considerations related to participation and partnership: an investigation of stakeholders’ perceptions of an action-research project on user fee removal for the poorest in Burkina Faso

    PubMed Central

    2014-01-01

    Background Healthcare user fees present an important barrier for accessing services for the poorest (indigents) in Burkina Faso and selective removal of fees has been incorporated in national healthcare planning. However, establishing fair, effective and sustainable mechanisms for the removal of user fees presents important challenges. A participatory action-research project was conducted in Ouargaye, Burkina Faso, to test mechanisms for identifying those who are indigents, and funding and implementing user fee removal. In this paper, we explore stakeholder perceptions of ethical considerations relating to participation and partnership arising in the action-research. Methods We conducted 39 in-depth interviews to examine ethical issues associated with the action-research. Respondents included 14 individuals identified as indigent through the community selection process, seven members of village selection committees, six local healthcare professionals, five members of the management committees of local health clinics, five members of the research team, and four regional or national policy-makers. Using constant comparative techniques, we carried out an inductive thematic analysis of the collected data. Results The Ouargaye project involved a participatory model, included both implementation and research components, and focused on a vulnerable group within small, rural communities. Stakeholder perceptions and experiences relating to the participatory approach and reliance on multiple partnerships in the project were associated with a range of ethical considerations related to 1) seeking common ground through communication and collaboration, 2) community participation and risk of stigmatization, 3) impacts of local funding of the user fee removal, 4) efforts to promote fairness in the selection of the indigents, and 5) power relations and the development of partnerships. Conclusions This investigation of the Ouargaye project serves to illuminate the distinctive

  11. Weldon Spring quarry construction staging area and water treatment plant site remedial action characterization report for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect

    Not Available

    1991-09-01

    The quarry construction staging area (QCSA) and water treatment plant (WTP) are located in the areas that border the western edge of the Weldon Spring quarry (WSQ). These facilities were constructed to support bulk waste removal from the WSQ. This area was contaminated with U-238, Ra-226, and Th-230 and was remediated prior to construction in order to allow release of the area for use without radiological restrictions. This report documents the methods of characterization, the remediation activities, and the post remedial action sampling methods and analytical results. 4 refs., 6 figs., 4 tabs.

  12. 75 FR 3464 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... completed project will have a design flow capacity of 7.5 million gallons per day (mgd) and overflow storage... 5.5 mgd pumping capacity at a total head of 207 feet. The project specification provided...

  13. 76 FR 2684 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... Reinvestment Act of 2009 (ARRA) to the Lake County Special Districts AGENCY: Environmental Protection Agency... quality) to the Lake County Special Districts (Lake County), California for the Kelseyville Wastewater Treatment Plant project. Lake County indicates that the design for the Kelseyville project (Project...

  14. A Collaborative Action Research Project in the Kindergarten: Perspectives and Challenges for Teacher Development through Internal Evaluation Processes

    ERIC Educational Resources Information Center

    Galini, Rekalidou; Efthymia, Penderi

    2010-01-01

    Background: Collaborative action research provides teachers with the framework and methodology to reflect upon their work and take action with regard to specific concerns and situations in their classrooms. Within this approach, internal evaluation could be a useful tool to help teachers develop critical thinking about their work by locating areas…

  15. 78 FR 64592 - Notice of Final Federal Agency Actions on the Stehekin Valley Road Improvement Project From the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... Improvement Project From the Stehekin River Corridor Implementation Plan: Chelan County, Washington AGENCY... Improvement project from the Stehekin River Corridor Implementation Plan in Chelan County, Washington. This... Decision, NPS Stehekin River Corridor Implementation Plan Environmental Impact Statement (EIS) and...

  16. Action Research Facilitator's Handbook.

    ERIC Educational Resources Information Center

    Caro-Bruce, Cathy

    This handbook is a roadmap for action research facilitators to help groups as they work through the research process. It offers quotations, handouts, strategies, resources, and insights from actual experiences. The sections of the handbook follow the action research cycle, focusing on: "What is Action Research?"; "What is the Action Research…

  17. Section 502(e) guidance providing credit toward energy efficiency goals for cost-effective projects where source energy use declines but site energy use increases

    SciTech Connect

    None, None

    2004-10-01

    Outlines how Section 502(e) of Executive Order 13123 requires the Secretary of Energy to “issue guidance for providing credit toward energy efficiency goals for cost-effective projects where source energy use declines but site energy use increases."

  18. 20 CFR 641.600 - What is the purpose of the private sector training projects authorized under section 502(e) of...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROVISIONS GOVERNING THE SENIOR COMMUNITY SERVICE... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What is the purpose of the private sector... purpose of the private sector training projects authorized under section 502(e) of the OAA? The purpose...

  19. Kaleidoscope: a 5-year action research project to develop nursing confidence in caring for patients with HIV disease in west India.

    PubMed

    Pratt, R J; Pellowe, C M; Juvekar, S K; Potdar, N S; Weston, A J; Joykutty, A; Robinson, N; Loveday, H P

    2001-09-01

    As the national epidemic of human immunodeficiency virus (HIV) infection and the acquired immune deficiency syndrome (AIDS) epidemic rapidly unfolds in India, nurses have to acquire new competencies in order to provide appropriate care to an increasing number of affected persons. In response, an Indo-British action research collaboration was initiated to build clinical confidence and facilitate relevant changes in nursing practice. During a 10-day educational programme, a change intervention was applied, culminating in the development of individual and partnership action plans focused on bringing about changes in nursing practice within well-defined fields of action. Following implementation of their action plans, participants were reassembled 12 months later for a follow-up workshop to discuss their progress and describe those factors that either helped or hindered them in achieving their objectives. They then developed new action plans for the next 12-month period. This article reports on the results from six cohorts (n = 160) in India who participated in this project between 1995 and 1999. Action plans were frequently focused on infection control, primary prevention, curriculum development in preregistration nursing programmes and in-service nursing education. The majority of participants reported significant achievements in realizing their action-plan objectives. Data analysis revealed that the change intervention itself, together with multidisciplinary support from colleagues, the senior status of the participant, and anticipating and attending the follow-up workshop, were all positively correlated with achievement. The lack of personal authority and resistance from managers were the two major factors negatively correlated with achievement. This method for facilitating changes in nursing practice has been successfully adapted and replicated by our group in other countries. PMID:11558691

  20. 75 FR 9207 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ...-manufactured pump systems do not meet these project specifications. Initial analysis by EPA's national... specifications, but observed that additional information clarifying the project's winter month flow requirements... specifications. Additional information provided by the MRCD specified that the system must also have a...